Public Works Committee — Agenda Packet
Ozaukee County · Ozaukee County · Public Works Committee · meeting of Sep 17, 2026 · Agenda packets
Open the original document More from Ozaukee County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
1
Public Works Committee
Regular Meeting
Thursday, September 17, 2026, 8:00 AM
Highway Department — Meeting Room
410 S. Spring Street, Port Washington, WI
The public can access the meeting by viewing the live stream on the County website, Agendas & Minutes page and select the meeting agenda
date.
The public can submit comments here: Public Comment Form
Public Comment Policy & Instructions For Submitting Public Comments Online
AGENDA
1. Call to Order
2. Proper Notice
3. Public Comments, Correspondence, Communications
4. Approval of Minutes
August 20, 2026
5. Volunteer to Serve on the Energy Action Commission
6. Discussion Items
a. 2027 Budget Recommendations for Public Works Committee
7. Facilities Management
a. Management/Financial/Informational Reports
8. Transit Services
a. Action Items
1. Unaccompanied Minors and Child Safety Restraints Rules
b. Management/Financial/Informational Reports
9. Highways
a. Action Items
1. CTH H Bridge Repair
b. Management/Financial/Informational Reports
10. Next Meeting Date
October 22, 2026
11. Adjournment
A quorum of members of committees or the full County Board of Ozaukee County may be in attendance at this meeting for purposes related to
committee or board duties. However, no formal action will be taken by these committees or the board at this meeting.
Persons with disabilities requiring accommodation for attendance at this meeting should contact the County Clerk’s Office at 262-284-8110, twenty-
four (24) hours in advance of the meeting.
Page 1 of 63
Item:
Agenda Item Information Sheet
To: Public Works Committee
From: Lisa Henning, Chief Deputy County Clerk
Meeting Date: September 17, 2026
Department/Office: County Clerk
Item Name: August 20, 2026
Summary:
Approve the August 20, 2026 minutes.
Recommended Action:
Approve the August 20, 2026 minutes as submitted.
Attachments:
1. PW MINUTES AUGUST 20 2026
Page 2 of 63
PUBLIC WORKS COMMITTEE
MEETING MINUTES
Regular Meeting
AUGUST 20, 2026
Draft Minutes Pending Committee Approval
1. Call to Order
A meeting of the Public Works Committee was held in the Highway office meeting room.
Present Supervisor Tom Bichler, Supervisor Scott Fischer, Supervisor Kevin Kennedy
Absent Supervisor Tom Grabow, Supervisor Justin Strom
Excused
Staff present: County Administrator Dzwinel, Public Works Director Edgren, Transit Superintendent Zutz, Project
Manager/Construction Superintendent Guettel (8:25AM) Patrol Superintendent Borden, and Chief Deputy County
Clerk Henning.
Others present: Joe Huiras, Lou Balch and Dan Benson - Ozaukee Press
2. Proper Notice
Chairperson Grabow and Vice-Chairperson Strom were not in attendance at 8:00 AM.
Motion made by Supervisor Fischer, seconded by Supervisor Kennedy to nominate Supervisor Bichler to act as
Chairperson for this meeting. Supervisor Bichler accepted the nomination. Motion carried.
Chairperson Bichler called the meeting to order at 8:01 AM. The clerk noticed the meeting as required.
3. Public Comments, Correspondence, Communications
There were none.
4. Approval of Minutes
June 18, 2026
Motion: Motion to approve the June 18, 2026 minutes as submitted.
Result: Passed
Moved by: Scott Fischer
Seconded by: Kevin Kennedy
Ayes: Tom Bichler, Scott Fischer, Kevin Kennedy
Nays: None
Page 3 of 63
Abstain: None
5. Public Hearing
a. Consider Proposed Changes to Service Hours for the Ozaukee County Shared-Ride Taxi
Chairperson Bichler opened the public hearing at 8:03 AM.
Lou Balch addressed the committee, asking them to consider extending the proposed service hours to
10:30 PM Monday through Friday and 8:30 PM on Saturdays. He also requested that the effective date
be delayed to allow late riders additional time to find alternative transportation.
Chairperson Bichler closed the public hearing at 8:08 AM.
6. Facilities Management
a. Management/Financial/Informational Reports
Mr. Edgren reported that the Justice Center is experiencing some roof issues. An infrared scan will be
conducted to identify the areas requiring attention. He also announced that Jayme Arndt has been
named the new Building Superintendent at the Administration Center. Mr. Arndt succeeds Joe Hicks,
who retired in July after 38 years of service.
Questions on the warranty and type of roof at the Justice Center.
7. Transit Services
a. Action Items
1. Changes to Service Hours for the Ozaukee County Shared-Ride Taxi
Ms. Zutz noted that service levels after 10:00 PM have been low and feels that ending services at 10:00
PM would be a beneficial change. She reached out to Portal, Inc., Balance, and Seek Careers/Staffing,
Inc. to obtain feedback. Portal, Inc. mentioned the possibility of extending service hours in the summer
to better accommodate transportation needs for evening group experiences.
Questions and discussion on a 30-day notice for a change in service hours as well as how frequently
service hours are reviewed and evaluated.
Motion: Motion to approve the proposed changes to the Ozaukee County Transit Services
Shared-Ride Taxi service hours effective January 1, 2027 as recommended.
Result: Passed
Moved by: Tom Bichler
Seconded by: Kevin Kennedy
Ayes: Tom Bichler, Scott Fischer, Kevin Kennedy
Nays: None
Abstain: None
2. No-Show Policy
Ms. Zutz noted that the updates will align Ozaukee County Transit Services's No-Show Policy with
applicable federal regulations and WisDOT guidance while supporting reliable and accessible service
for all riders.
Motion: Motion to approve the updated Ozaukee County Transit Services No-Show Policy
effective September 1, 2026.
Result: Passed
Moved by: Scott Fischer
Page 4 of 63
Seconded by: Kevin Kennedy
Ayes: Tom Bichler, Scott Fischer, Kevin Kennedy
Nays: None
Abstain: None
3. Reasonable Modification Policy
Ms. Zutz explained that the adoption of the Reasonable Modification Policy will support compliance
with applicable federal regulations and Wisconsin Department of Transportaion (WisDOT) guidance
while providing riders with clear information about requesting a reasonable modification.
Motion: Motion to approve the updated Ozaukee County Transit Services Reasonable
Modification Policy effective September 1, 2026.
Result: Passed
Moved by: Kevin Kennedy
Seconded by: Scott Fischer
Ayes: Tom Bichler, Scott Fischer, Kevin Kennedy
Nays: None
Abstain: None
4. Fare Payment and Service Hold Policy
8:25 AM Project Manager/Construction Guettel joined the meeting.
Ms. Zutz noted that the proposed policy establishes consistent procedures for managing unpaid fares,
provides riders and responsible agencies with notice and an opportunity to resolve or appeal an
outstanding balance before a service hold takes effect. The policy is expected to improve collection of
outstanding fares and reduce administrative time associated with outstanding account balances.
Questions and discussion on the number of riders with outstanding balances.
Motion: Motion to approve the Ozaukee County Shared-Ride Taxi Fare Payment and
Service Hold Policy effective September 1, 2026.
Result: Passed
Moved by: Tom Bichler
Seconded by: Kevin Kennedy
Ayes: Tom Bichler, Scott Fischer, Kevin Kennedy
Nays: None
Abstain: None
5. Ecolane Center Portal for Agency Partners
Providing partner agencies with direct access to their client's information will reduce administrative
workload and manual reporting requests while allowing agencies to better manage transportation
funding and services for their sponsored clients.
Motion: Motion to authorize the Transit Superintendent to purchase the Ecolane Centers
Portal at an annual cost of approximately $5,500.
Result: Passed
Moved by: Kevin Kennedy
Seconded by: Tom Bichler
Ayes: Tom Bichler, Scott Fischer, Kevin Kennedy
Nays: None
Abstain: None
Page 5 of 63
b. Management/Financial/Informational Reports
Mr. Edgren distributed an updated ridership report. Ridership remains up 6.1% compared to July 2025.
Updates on GO Riteway Exercise of Option, Memorandums of Understanding with several
organizations, additional GO Riteway service hours and proposed change in the minimum age for
unaccompanied riders.
8. Highways
a. Action Items
1. N6968 CTH I Driveway Variance Request
Mr. Edgren reviewed Mr. Huiras's driveway variance request and the reason for denial of the culvert
permit.
Mr. Huiras discussed driveway access to the proposed parcel.
Questions and discussion on the speed limit on CTH I and whether vehicles could reach speeds of
55MPH, the proposed location of the residence, the location of the field driveway, and safety concerns
regarding the north driveway being located near the crest of a hill.
Mr. Edgren reiterated that variances typically should not be approved when a request does not meet the
Ozaukee County Access Control Code. However, he noted that this request is difficult to oppose
because the surrounding parcels immediately to the north and south also have driveways that do not
meet Code.
Further discussion focused on the non-conforming driveways on the surrounding parcels. While these
driveways do not meet the current Code, they appear to be reasonably spaced and consistent with the
existing neighborhood pattern.
Motion: Motion to approve the variance request for the fact that the neighboring three
houses to the north and south do not meet the spacing requirements and are
consistent with the existing neighborhood pattern.
Result: Passed
Moved by: Kevin Kennedy
Seconded by: Scott Fischer
Ayes: Tom Bichler, Scott Fischer, Kevin Kennedy
Nays: None
Abstain: None
2. CTH H Bridge Repair
Mr. Edgren explained that the bridge has shown deterioration over the last several years. He noted that
the bridge required a temporary closure in March 2026 to repair a hole in the bridge deck. The bridge
reopened in mid-April; however, in late July an inspection found that cracking had expanded through
the deck. The bridge was subsequently closed to vehicular traffic and remains closed as of this date.
Following a discussion with the bridge inspector from CORRE on August 19, 2026, Mr. Edgren
indicated that the bridge may be able to remain in service if additional steel plates are installed along the
center of the bridge. Discussion on the potential impact of snow plowing on the steel plates as well as
the possibility of closing the bridge during the winter months.
Because the Wisconsin Department of Transportation's (WisDOT) Bridge Grant Program is not
expected to be available until fall 2027, staff is exploring a short-term repair option to maintain the
bridge until a future grant application can be submitted.
Page 6 of 63
Due to the uncertainty regarding repair costs and the availability of the WisDOT Bridge Grant Program,
Mr. Edgren requested that CORRE prepare a cost estimate to put the project out for bid so that
a professional bridge contractor can perform the necessary repairs.
Discussion continued regarding the type of traffic utilizing the bridge, potential traffic detours if the
bridge remains closed until spring, installation of additional steel plating, and the option of full bridge
replacement.
No action was taken.
b. Discussion Items
1. CTH W Expansion
A developer has approached the Village of Grafton regarding a potential large commercial development
on the east side of CTH W (Port Washington Road), immediately south of Arrowhead Road. Based on
significant development that has occurred in the area, the Village previously requested that the highway
layout be expanded to a four-lane, urban cross-section with an Ozaukee County cost-share. The Village
is considering a similar arrangement for this proposed development.
The developer is in the process of performing a Traffic Impact Analysis (TIA) for the surrounding area.
Upon completion, the findings will be submitted to the Village of Grafton and Ozaukee County for
review.
If the development moves forward and the Village requests a cost-share from Ozaukee County, a
Memorandum of Understanding (MOU) will be brought before the Public Works Committee for
consideration and approval.
c. Management/Financial/Informational Reports
Updates on CTH W construction, CTH W Streetscaping Project in Mequon, CTH A patching, and
upgrade at the asphalt plant to allow production of warm mix asphalt.
Question on County Roads and Bridges - Property Tax line item.
9. Next Meeting Date
September 17, 2026
10. Adjournment
Motion made by Supervisor Kennedy, seconded by Supervisor Fischer to adjourn. Motion carried. Meeting
adjourned at 9:31 AM.
Lisa M. Henning, Chief Deputy County Clerk
Page 7 of 63
Item: 6.a.
Agenda Item Information Sheet
To: Public Works Committee
From: Chad Balke, Budget Manager/Asst. to County Administrator
Meeting Date: September 17, 2026
Department/Office: Dept of Administration
Item Name: 2027 Budget Recommendations for Public Works Committee
Summary:
Review the 2027 budget recommendations for departments within the Public Works Committee.
Recommended Action:
None
Attachments:
1. Facilities - Justice Center Budget Report 8.6.26
2. Facilities - Administration Center Budget Report 8.6.26
3. Transit Budget Report 9.9.26
4. Fairgrounds Budget Report 9.9.26
5. Highway Budget Report 9.9.26
6. Highway CIP
Page 8 of 63
Mission
Facilities Management's objective is to provide the county, its employees and the public a clean and safe environment in which to conduct business. Our efforts will be to dothis as efficiently and economically as possible.
Facilities - Justice Center
Budget Report
1
Page 9 of 63
Programs & Services
The Facilities - Justice Center staff is responsible for the day-to-day maintenance of the Justice Center. Some of the responsibilities include complete building repair andmaintenance as needed including security, HVAC, electrical, plumbing and kitchen equipment as well as the structure itself. In addition, routine grounds and buildingmaintenance. The Superintendent of the Justice Center is also responsible to maintain the Advocates House (leased out to a local non-profit) and the County Fairgrounds. TheFairgrounds is a separate fund (see that fund budget page for more information). The majority (99%) of the budget is for the Justice Center, and the rest is the AdvocatesHouse.
Performance Metrics
$559,876.29Expenses in 2026
Justice Center
Justice Center andAdvocates House
Data Updated Aug 06, 2026, 2:46PM
2
Page 10 of 63
Budget Highlights
The Facilities - Justice Center Current Service Level Budget increases tax levy by $48,156 or 5% over the 2026 Adopted tax levy, and the expenses increase by the same
amount. Most of the increase is due to Salaries and Benefits. There are no Revenues budgeted in the Justice Center, and the graphs and tables below will not show revenues.
The expenses also include the facility for the Advocates.
Salaries and Benefits increases by $44,257 or 6.7% over last year's budget. Regular Salaries increase by $30,126 or 6.2%, and Health Insurance increases by $9,432 or 9.3%.
Interdepartmental Charges increase by about $3,899 or 17.6% for the IT fee internal chargeback. Most other Operating Expenses are flat.
Expansion Requests
There are no expansion requests for 2027.
Facilities - Justice Center - Tax Levy
2024 Actual 2025 Actual 2026 Adopted 2026 YTD Actual 2027 Budget
Revenues $500 $0 $0 $0 $0
Expenses $980,901 $920,771 $953,350 $559,876 $1,001,506
REVENUES LESS EXPENSES -$980,401 -$920,771 -$953,350 -$559,876 -$1,001,506
$559,876.29
Expenses in 2026
Salaries & F...
Interdepartm...
Supplies und...
Purchased Se...
$559,876.29
Expenses in 2026
$0
$200K
$400K
$600K
$800K
$1M
2024 2025 2026 2026
About two-thirds of this budget is for Salaries and Benefits. Purchased Services, at 25% of the budget, is the second largest category, and accounts for things like grounds
maintenance, utilities, building repairs, and contracts to provide maintenance for the various systems. Supplies is another area of the budget that accounts for the purchase of
parts, janitorial goods, and maintenance supplies.
Facilities - Justice Center - Expenses by Type
2024 Actual 2025 Actual 2026 Adopted 2026 YTD Actual 2027 Budget
Interdepartmental Charges $57,839 $34,257 $44,912 $25,450 $48,811
Other Expenses $1,345 $2,745 $1,150 $0 $1,150
Purchased Services $247,568 $242,764 $210,253 $144,419 $210,253
Salaries & Fringe Benefits $631,899 $599,469 $653,131 $362,011 $697,388
Supplies under $5,000 $41,931 $41,536 $43,804 $27,997 $43,804
Travel/Mileage/Conference&Meetings $319 $0 $100 $0 $100
TOTAL $980,901 $920,771 $953,350 $559,876 $1,001,506
Advocates House - Expense by Type
2024 Actual 2025 Actual 2026 Adopted 2026 YTD Actual 2027 Budget
Interdepartmental Charges $352 $0 $2,001 $0 $2,001
Purchased Services $614 $4,422 $10,000 $0 $10,000
Supplies under $5,000 $416 $566 $501 $0 $501
TOTAL $1,383 $4,988 $12,502 $0 $12,502
Facilities - Justice Center - Expenses by Type Facilities - Justice Center - Expenses by Type
3
Page 11 of 63
Facilities - Justice Center CIP Requests
Position Changes
2027 Budget: No changes
2026 Adopted Budget: No changes
2025 Adopted Budget: No changes
2024 Proposed Budget: No changes
2023 Adopted Budget: No changes
2022 Adopted Budget: 2 FT Maintenance Mechanics upgraded
4
Page 12 of 63
Mission
Facilities Management's objective is to provide the county, its employees and the public a clean and safe environment in which to conduct business for the AdministrationCenter; the Port Washington, Waubeka and Cedarburg highway locations; and the Transit building. Our efforts will be to do this as efficiently and economically as possible.
Programs and Services
The Facilities Management strives to maintain a high quality of maintenance and service to Ozaukee County buildings with less and more efficient staff members. Many of themaintenance tasks are done in-house with a skilled staff. Services are outsourced for things like electrical work and major renovations. Minor renovations, including things likesmall bathroom renovations, are routinely done in-house.
Performance Metrics
Facilities - Administration Building
Budget Report
1
Page 13 of 63
Budget Highlights
The Facilities - Administration Building Current Service Level Budget increases tax levy by $37,614 or 5.6% over the 2026 adopted budget tax levy. Expenses in theDepartment show an increase of $47,238 or 6.4% over the 2026 adopted budget. Many supply and utility accounts were increased by about 3-5% for inflationary costincreases. The revenue is the janitorial space that is charged to the Human Services Fund. This revenue increase follows any salary and benefit increases for maintenance staff in thisdivision. Expansion RequestsThere are no expansion requests in the 2026 budget.
Facilities - Administration Center - Tax Levy
2024 Actual 2025 Actual 2026 Adopted 2026 YTD Actual 2027 BudgetRevenues $72,886 $75,030 $76,530 $38,227 $86,154Expenses $654,754 $658,242 $743,256 $409,922 $790,494REVENUES LESS EXPENSES -$581,868 -$583,212 -$666,726 -$371,695 -$704,340
$409,921.91Expenses in 2026
Salaries & F...
Interdepartm...Supplies und...
Purchased Se...
$409,921.91Expenses in 2026
$0
$200K
$400K
$600K
$800K
2024 2025 2026 2026
Most of the increase in expenses is due to increase in Salaries and Benefits. This 9% increase is due to normal increases in personnel costs. Regular Salaries increase by$23,688 or 7.8%. Health Insurance increases by $13,164 or 23%. Most other operating accounts increase slightly from last year's budget based on inflationary cost increases. Most line-items were increased by 3-5%.
Facilities - Administration Center - Expenses by Type
2024 Actual 2025 Actual 2026 Adopted 2026 YTD Actual 2027 BudgetInterdepartmental Charges $16,183 $12,823 $13,664 $11,563 $15,370Other Expenses $1,120 $1,120 $1,120 $0 $1,154Purchased Services $240,738 $199,371 $230,097 $96,132 $235,301Salaries & Fringe Benefits $343,739 $400,198 $419,047 $269,962 $456,957Supplies under $5,000 $52,975 $44,457 $79,328 $32,265 $81,712Travel/Mileage/Conference&Meetings $0 $273 $0 $0 $0
Facilities - Administration Center - Expenses by Type Facilities - Administration Center - Expenses by Type
2
Page 14 of 63
2024 Actual 2025 Actual 2026 Adopted 2026 YTD Actual 2027 Budget
TOTAL $654,754 $658,242 $743,256 $409,922 $790,494
Facilities - Administration Center - Revenues by Type
2024 Actual 2025 Actual 2026 Adopted 2026 YTD Actual 2027 Budget
Interdepartmental Revenue for County
Services $72,886 $75,030 $76,530 $37,515 $86,154
Other (Donations/One-time/Misc) $0 $0 $0 $712 $0
TOTAL $72,886 $75,030 $76,530 $38,227 $86,154
Facilities - Administration Center CIP Requests
Position Changes
2026 Adopted Budget: No changes
2025 Adopted Budget: No changes
2024 Adopted Budget: $5,000 increase Overtime
2023 Adopted Budget: No changes
2022 Adopted Budget: 2 FT positions upgraded
3
Page 15 of 63
Mission
The mission of the Ozaukee County Transit Services Department is to provide reliable, convenient, safe public transportation that efficiently andeffectively meets the varied travel needs of the community and significantly enhances the quality of life for all.
Programs and Services
The goal of this program is to provide an economical and environmentally friendly way to transport employees to and from their sources ofemployment, and to provide transportation alternatives for those in need. Activities of this program include bus and route operation, route planning,bus maintenance, and program and grant administration. The dark blue bar in the graph below is the Shared Ride Taxi and represents about 76% ofthe entire expenses. The rest, about 24%, is the Express Bus service. Starting in 2025, the Express Bus service has been eliminated due to a lack ofridership and increasing costs. The graph below shows the remaining taxi program in the dark blue color.
Transit Services
Budget Report
1
Page 16 of 63
$1,248,075.16Expenses in 2026
$0
$500K
$1M
$1.5M
$2M
$2.5M
$3M
$3.5M
$4M
$4.5M
2024 2025 2026 2026
Performance Metrics
Strategic Objectives
Strategic Objective C. Implement Innovative Public Transportation Solutions• Implemented a new routing and dispatch software for the Shared Ride Taxi.
Transit - Expenses byProgram
Data Updated Aug 10, 2026, 4:15PM
2
Page 17 of 63
• Partnered with Interfaith Caregivers of Ozaukee County to apply for grant funding to implement a Coordinated Transportation Committee forOzaukee County. This is a direct response to the County’s community outreach meeting for ARPA projects. The purpose of the CoordinatedTransportation Committee is to increase coordination among transportation providers, thereby reducing gaps in transportation needs.Strategic Objective D. Expand Regional Transportation Services• Completed pilot offering cross-county Shared Ride Taxi service with Washington County. Both counties adopted a new MOU to continue offeringthe service.• Initial project plan approved to begin exploration and outreach to establish a flexible route bus service between Milwaukee and Ozaukeecounties.• Transit is exploring alternatives to the current commuter bus service to Milwaukee to increase efficiency.
Budget Highlights
The Transit Department 2027 Current Service Level Budget increases tax levy by $345,210 or 138% over the 2026 adopted tax Levy. Unlike otherCounty departments, this budget is over 75% Purchased Services. Staff is responsible for managing only the Shared Ride Taxi. The Express BusService was eliminated in 2024. Salaries and Benefits increase by $5,571 or 2.8% compared to last year's budget. One position was eliminated in2024 after the decision not to pursue a combined Washington and Ozaukee County system. There have been several years of various changes tothe expenses and revenues in this budget, and it has made this budget fluctuate from year-to-year. The department is currently analyzing theimpact of a potential change to the funding mechanism related to state and federal DOT programs. The change is expected to happen in 2025and 2026 will be the first full year. The tax levy that was used for the bus service is still temporarily located in Capital Reserve and could be madeavailable in the funding formula changes and leads to a negative impact. Most of the levy increase is a product of decreasing revenues and theincreased cost for the taxi contract. Purchased Services in the Shared Ride Taxi increases by $155,152 or 6.6%. There are decreases in some of the line-items that help offset the taxicontract. The contract to provide the taxi service increases by $189,589 or 8.4%. All Revenues decrease by $152,343 or 5.1%. Revenues for Public Charges (fares) are increased by $37,750 or 6.7%. Intergovernmental Revenue(State and Federal Aid) is increased by $140,694 or 6.7%. Other Revenue is mostly eliminated from the budget, and this primarily includes$330,786 that was budgeted for various federal funding like stimulus funds. Expansion RequestsThere are no expansion requests in the department.
Transit - Tax Levy
2024 Actual 2025 Actual 2026 Adopted 2026 YTD Actual 2027 BudgetRevenues $3,343,108 $4,440,097 $2,984,770 $803,204 $3,174,638Expenses $3,548,908 $4,456,173 $3,233,599 $1,309,291 $3,423,466REVENUES LESS EXPENSES -$205,800 -$16,076 -$248,829 -$506,087 -$248,828
$1,309,290.69Expenses in 2026
Purchased Se...
OtherOther Expens...Salaries & F...Interdepartm...
Supplies und...
$1,309,290.69Expenses in 2026
$0
$1M
$2M
$3M
$4M
$5M
2024 2025 2026 2026
Transit - Expenses by Type Transit - Expenses by Type
3
Page 18 of 63
$803,203.91Revenues in 2026
$0
$1M
$2M
$3M
$4M
$5M
2024 2025 2026 2026
$132.97Revenues in 2026
$0$50K$100K$150K$200K$250K$300K$350K
2024 2025 2026 2026
Transit - Expenses by Type
2024 Actual 2025 Actual 2026 Adopted 2026 YTD Actual 2027 BudgetEquipment & Software $494,144 $1,279,403 $213,251 $0 $200,000Interdepartmental Charges $201,305 $478,173 $154,602 $104,938 $170,809Other Expenses $57,424 $73,416 $40,602 $0 $40,607Purchased Services $2,303,693 $2,165,938 $2,343,050 $958,343 $2,498,202Salaries & Fringe Benefits $169,835 $190,003 $198,777 $67,372 $204,348Supplies under $5,000 $319,524 $268,229 $278,814 $117,423 $307,500Travel/Mileage/Conference&Meetings $2,983 $1,012 $4,503 $0 $2,000TOTAL $3,548,908 $4,456,173 $3,233,599 $1,248,075 $3,423,466
Transit - Revenues by Type
2024 Actual 2025 Actual 2026 Adopted 2026 YTD Actual 2027 BudgetInterest $8,106 $3,494 $0 $1,197 $0Intergovernmental Revenue for CountyServices $1,721 $0 $0 $0 $0
Intergovernmental Rev (State, Federal, Local) $2,929,016 $3,817,920 $2,086,733 $354,641 $2,227,427Other (Donations/One-time/Misc) $20,180 $26,294 $335,787 $133 $347,211Public Charges for County Services $384,086 $592,390 $562,250 $447,233 $600,000TOTAL $3,343,108 $4,440,097 $2,984,770 $803,204 $3,174,638
Transit - Revenues by Type Transit - Covid and Stimulus Funding
4
Page 19 of 63
Transit CIP Request
Transit CIP
2024 Actual 2025 Actual 2026 Adopted 2026 YTD Actual 2027 Budget
Operations
Shared Ride Taxi $494,144 $1,279,403 $213,251 $0 $200,000
OPERATIONS TOTAL $494,144 $1,279,403 $213,251 $0 $200,000
TOTAL $494,144 $1,279,403 $213,251 $0 $200,000
Position Changes
2027 Budget: No changes
2026 Adopted Budget: No changes
2025 Adopted Budget: No changes
2024 Adopted Budget: Eliminate Transit Analyst due to change in
organizational structure with Washington County. Position is 100%
utilized by Washington County.
2023 Adopted Budget: 1 new Transit Analyst position shared between
Ozaukee and Washington County.
5
Page 20 of 63
Mission
Ozaukee County Fairgrounds hosts a variety of fairs, events, and special occasions. The beautiful facilities are located in the heart of OzaukeeCounty and offer ample space and parking along with unique shopping, dining and lodging nearby.
Budget Highlights
The Fairgrounds budget is always adjusted based on the contractual obligations with the Curlers and other factors like revenue for rental offacilities. The 2027 budget increases revenue by about $10,000 from the 2026 Adopted Budget. Total expenses are up $9,958 or 2.7%. Salariesand Benefits are decreased by $9,958 or 6.9% compared to last year and are still well above the prior year actuals. Reservations for facilities havebeen strong, and we anticipate enough revenue to offset expense increases in the short-term. This budget is overseen by the Buildings Superintendent of the Justice Center facility. Expansion RequestsThere are no expansion requests.
Fairgrounds - Tax Levy
2024 Actual 2025 Actual 2026 Adopted 2026 YTD Actual 2027 BudgetRevenues $232,900 $217,225 $257,378 $108,158 $267,336Expenses $358,894 $411,105 $372,169 $360,905 $382,127REVENUES LESS EXPENSES -$125,994 -$193,880 -$114,791 -$252,747 -$114,791
$108,157.76Revenues in 2026
$0
$50K
$100K
$150K
$200K
$250K
$300K
2024 2025 2026 2026
$108,793.88Expenses in 2026
$0
$50K
$100K
$150K
$200K
2024 2025 2026 2026
County Fairgrounds
Budget Report
Fairgrounds - Revenues Fairgrounds - Salaries and Benefits
1
Page 21 of 63
Fairgrounds - Expenses by Type
2024 Actual 2025 Actual 2026 Adopted 2026 YTD Actual 2027 Budget
Interdepartmental Charges $22,901 $14,983 $11,824 $6,290 $11,824
Other Expenses $5,275 $5,250 $6,251 $8,610 $6,251
Purchased Services $216,884 $217,597 $183,805 $212,167 $183,805
Salaries & Fringe Benefits $90,434 $156,252 $145,111 $108,794 $155,069
Supplies under $5,000 $22,838 $17,023 $24,677 $25,043 $24,677
Travel/Mileage/Conference&Meetings $562 $0 $501 $0 $501
TOTAL $358,894 $411,105 $372,169 $360,905 $382,127
Fairgrounds - Revenues by Type
2024 Actual 2025 Actual 2026 Adopted 2026 YTD Actual 2027 Budget
Interest $3,238 $2,846 $10,000 $0 $10,000
Other (Donations/One-time/Misc) $0 $0 $3,000 $0 $3,000
Public Charges for County Services $229,662 $214,379 $244,378 $108,158 $254,336
TOTAL $232,900 $217,225 $257,378 $108,158 $267,336
Fairgrounds CIP Requests
There are no CIP requests.
Position Changes
2027 Budget: No changes
2026 Adopted Budget: No changes
2025 Adopted Budget: No changes
2024 Adopted Budget: No changes
2023 Adopted Budget: No changes
2022 Adopted Budget: Replace PT help with 1 FT Maintenance. No FTE
impact.
2
Page 22 of 63
Mission
The Ozaukee County Highway Department seeks to provide and maintain the highest quality transportation system possible, one that balances thedesires of County taxpayers for safety, speed and efficiency, and to provide for it in a fiscally responsible manner.
Highway Department
Budget Report
1
Page 23 of 63
Programs and Services
Our goal is to construct and maintain the Ozaukee County transportation system. Working under contract of the State of Wisconsin Department ofTransportation, services are provided to maintain 27 miles of Interstate Highway, 152 County Roads, 64 miles of State Trunk Highways, and providemaintenance to townships throughout the county.The primary purpose of the Highway Department is to provide and maintain quality transportation infrastructure in the county. The programs allserve that purpose. The Highway Administration provides the county-wide planning and assessment of the infrastructure for all of the roads,bridges, culverts, and other assets as needed. Highway Operations is responsible for the maintenance and replacement of all highway equipment used throughout the department to perform itsvarious services. The goal is to set schedules for replacement; determine cost-effective purchases; and developing the department’s plan forcapital improvements. General Maintenance consists of work performed on the infrastructure, like roads and bridges. This can include the interstate system, town roadswhere work is performed under a contract with the town, county roads, and other assets as needed. Activities can vary depending on the project,such as: patrolling, surface maintenance, shoulder maintenance, pavement marking, lighting, and sign repair. Another service involves the provision of Winter Maintenance services on State highways, interstate highways (I-43), and weather monitoring. Thecosts of maintenance of these roads are reimbursed by contract. Activities can vary depending on the project; examples include patrolling, snowremoval, application of ice control, or other services depending on weather conditions. Construction is another service provided by the department. This involves a major project designed to significantly improve the respectiveinfrastructure. In-house and outsourced engineering, right of way acquisition, road base and surfacing of roadways with asphalt or concrete.Construction typically happens when the infrastructure is beyond its useful life. The Highway Department provides services to numerous CountyDepartments. The Department is often contracted by other local units of government to provide similar services. These projects are direct revenueto the department.
2
Page 24 of 63
Performance Metrics
Strategic Objectives
Strategic Goal: Provide a Safe and Efficient Transportation System for All Ozaukee County ResidentsStrategic Objective: (A) Assess Existing Operations1) We’ve been performing past reviews of projects at year-end to collect data on better cost estimating.2) We’ve been investigating expanded salt brine operations, which is better financially and environmentally for Ozaukee County. Strategic Objective: (B) Focus on Highway Transportation Planning1) Performed analysis of County Highways for widening needs, and focused upcoming WisDOT Grant funding towards those highways.2) Opitz Gravel Pit is beginning to enter 3rd of 7 sections. Anticipate seeking our next gravel source within a couple years.
Budget Highlights
The Highway Department (Enterprise Fund) remains flat for the 2027 Current Service Level Budget and includes the typical $133,000 in tax levy forlocal town aide. The Highway Department is the business-like arm for the work being completed on County, State, and certain town roads. Thereare three primary customers: the County, the State, and some local towns. The County Roads and Bridges Fund (Special Revenue Fund) is theaccounting mechanism for the County tax levy used to repair County owned roadways. The Town Bridge Fund (Special Revenue Fund) provideslevied funding for various bridge projects. There are no projects or levy planned in 2027, but there are some projects planned for 2028. County Roads & Bridges fund increases in the 2027 budget by $157,980 or 4.7%. Historically 6-7 miles of road constructed each year. Cost ofmaterials and complexity of project will impact the total number of miles. The tax levy has been held flat for several years, and the department hasbeen allowed to utilize reserves (depending on fund balances) for additional projects. The Highway Department is instructed to attempt more workfor other customers including the State and local towns. This means completing less work for County owned roads. The Highway Department isalso instructed to leave at least one position vacant in order to create some salary savings in the budget, but we have not budgeted an actual VATestimate in the fund. Expansion RequestsThere are no expansion requests in 2027.
County Roads & Bridges - Tax Levy
2024 Actual 2025 Actual 2026 Adopted 2026 YTD Actual 2027 BudgetRevenues $1,751,132 $2,578,312 $1,780,710 $1,336,991 $1,940,636Expenses $5,616,974 $4,319,440 $5,096,203 $2,833,066 $5,256,127REVENUES LESS EXPENSES -$3,865,842 -$1,741,127 -$3,315,493 -$1,496,075 -$3,315,491
Highway - Tax Levy
3
Page 25 of 63
2024 Actual 2025 Actual 2026 Adopted 2026 YTD Actual 2027 BudgetRevenues $11,768,169 $10,901,631 $12,536,792 $5,623,997 $12,879,839Expenses $11,031,500 $11,316,471 $12,669,792 $6,325,634 $13,012,839REVENUES LESS EXPENSES $736,668 -$414,840 -$133,000 -$701,637 -$133,000
$6,325,634.13Expenses in 2026
Salaries & F...
OtherOther Expens...Equipment & ...Purchased Se...
Supplies und...
$3,106,000.08Expenses in 2026
$0$1M$2M$3M$4M$5M$6M$7M
2024 2025 2026 2026
$3,268,975.20Expenses in 2026
$0
$1M
$2M
$3M
$4M
$5M
$6M
2024 2025 2026 2026
$5,623,997.32Revenues in 2026
$0$2M$4M$6M$8M$10M$12M$14M
2024 2025 2026 2026
County Roads & Bridges - Expenses by Type
2024 Actual 2025 Actual 2026 Adopted 2026 YTD Actual 2027 BudgetInterdepartmental Charges $5,616,974 $4,319,440 $5,096,203 $2,833,066 $5,256,127TOTAL $5,616,974 $4,319,440 $5,096,203 $2,833,066 $5,256,127
County Roads & Bridges - Revenues by Type
2024 Actual 2025 Actual 2026 Adopted 2026 YTD Actual 2027 BudgetIntergovernmental Rev (State, Federal, Local) $1,751,132 $1,762,870 $1,780,710 $1,336,991 $1,782,654Other (Donations/One-time/Misc) $0 $815,442 $0 $0 $157,982TOTAL $1,751,132 $2,578,312 $1,780,710 $1,336,991 $1,940,636
Highway - Expenses by Type
2024 Actual 2025 Actual 2026 Adopted 2026 YTD Actual 2027 BudgetBuildings $0 $0 $130,000 $36,997 $30,000Depreciation $1,058,094 $1,065,057 $1,087,002 $0 $1,086,002Equipment & Software $247,029 $382,634 $545,000 $342,358 $520,600Grants $197,633 $218,255 $133,000 $52,812 $133,000Interdepartmental Charges -$2,830,119 -$2,157,593 -$2,722,487 -$1,078,147 -$2,666,779Operating Transfers Out $0 $117,362 $0 $0 $0Other Expenses $313,288 $486,242 $258,394 $99,580 $265,790Purchased Services $422,929 $827,345 $2,974,093 $487,709 $2,370,081
Highway - Expenses by Type Highway - Supplies and Materials
Highway - Salaries and BenefitsHighway - Revenues by Type
4
Page 26 of 63
2024 Actual 2025 Actual 2026 Adopted 2026 YTD Actual 2027 BudgetSalaries & Fringe Benefits $4,960,976 $5,320,852 $5,469,624 $3,268,975 $5,915,064Supplies under $5,000 $6,647,936 $5,039,976 $4,774,841 $3,106,000 $5,337,581Travel/Mileage/Conference&Meetings $13,733 $16,341 $20,325 $9,350 $21,500TOTAL $11,031,500 $11,316,471 $12,669,792 $6,325,634 $13,012,839
Highway - Revenues by Type
2024 Actual 2025 Actual 2026 Adopted 2026 YTD Actual 2027 BudgetInterdepartmental Revenue for CountyServices $2,803,470 $2,304,319 $2,853,730 $1,775,431 $2,910,630
Intergovernmental Revenue for CountyServices $7,849,224 $7,922,628 $7,352,161 $3,680,926 $7,666,067
Intergovernmental Rev (State, Federal, Local) $0 $215,489 $1,857,000 $0 $1,787,000Licenses & Permits $329,907 $368,511 $395,178 $92,077 $417,707Other (Donations/One-time/Misc) $785,567 $90,683 $78,723 $75,563 $98,435TOTAL $11,768,169 $10,901,631 $12,536,792 $5,623,997 $12,879,839
5
Page 27 of 63
Highway CIP Requests
See attached
Highway - CIP
2024 Actual 2025 Actual 2026 Adopted 2026 YTD Actual 2027 Budget
Buildings $0 $0 $130,000 $36,997 $30,000
Equipment & Software $247,029 $382,634 $545,000 $342,358 $520,600
TOTAL $247,029 $382,634 $675,000 $379,355 $550,600
Position Changes
2027 Budget: No Changes
2026 Adopted Budget: No changes
2025 Adopted Budget: Night Shift Premium estimated at $8,000 per
year but not approved in the budget
2024 Adopted Budget: 1 Equipment Operator (not approved)
2023 Adopted Budget: 1 Equipment Operator (not approved)
2022 Adopted Budget: $1 Premium for a Foremen (approved)
2021 Adopted Budget: Added 1 Equipment Operator (approved)
6
Page 28 of 63
DEPARTMENT: Highway
PROJECT NAME
STRATEGIC
OBJECTIVE
PRIMARY SOURCE OF
FUNDING
FUNDING SOURCE
COMMENT 2027 2028 2029 2030 2031 TOTAL
CTH K Road Network Tax Levy (Budget Process) 110,000 110,000
-
PRIORITY: Required
PROJECT NAME
STRATEGIC
OBJECTIVE
PRIMARY SOURCE OF
FUNDING
FUNDING SOURCE
COMMENT 2027 2028 2029 2030 2031 TOTAL
CTH I Road Network Tax Levy (Budget Process) 600,000 600,000
-
PRIORITY: Required
PROJECT NAME
STRATEGIC
OBJECTIVE
PRIMARY SOURCE OF
FUNDING
FUNDING SOURCE
COMMENT 2027 2028 2029 2030 2031 TOTAL
CTH I Road Network Tax Levy (Budget Process) 60,000 60,000
-
PRIORITY: Required
PROJECT NAME
STRATEGIC
OBJECTIVE
PRIMARY SOURCE OF
FUNDING
FUNDING SOURCE
COMMENT 2027 2028 2029 2030 2031 TOTAL
CTH I Road Network Tax Levy (Budget Process) 300,000 300,000
-
PRIORITY: Required
PROJECT NAME
STRATEGIC
OBJECTIVE
PRIMARY SOURCE OF
FUNDING
FUNDING SOURCE
COMMENT 2027 2028 2029 2030 2031 TOTAL
CTH I Road Network Tax Levy (Budget Process) 300,000 300,000
-
PROJECT DESCRIPTION:
PRIORITY: Required
PROJECT NAME STRATEGIC PRIMARY SOURCE OF FUNDING SOURCE 2027 2028 2029 2030 2031 TOTAL
CTH Y Road Network Other (explain in comme State/Cty Levy 50,000 50,000
-
PROJECT DESCRIPTION:
PRIORITY: Required
PROJECT NAME STRATEGIC PRIMARY SOURCE OF FUNDING SOURCE 2027 2028 2029 2030 2031 TOTAL
CTH W Road Network Other (explain in comme State/Cty Levy 170,000 170,000
-
PROJECT DESCRIPTION:
PRIORITY: Required
PROJECT NAME
STRATEGIC
OBJECTIVE
PRIMARY SOURCE OF
FUNDING
FUNDING SOURCE
COMMENT 2027 2028 2029 2030 2031 TOTAL
Cty Hwys Road Network Other (explain in comme Federal/Cty Levy 50,000 50,000
-
PRIORITY: Required
OZAUKEE COUNTY 5 YEAR CAPITAL IMPROVEMENT PLAN
CTH I - STH 33 to Center Rd; 2.5" Overlay (1 mile) (2,700 ton)
PROJECT DESCRIPTION:
CTH K - CTH KW to Termaat Rd; 2.5" Overlay; Widen to 28' (0.3 miles) (900 ton)
PROJECT DESCRIPTION:
CTH I -CTH Z to Fredonia-Kohler Rd; 2.5" Overlay (0.2 miles) (450 ton)
PROJECT DESCRIPTION:
CTH I - Cedar Sauk Rd to STH 33; 2.5" Overlay; Widen to 30' (1.8 miles) (4,550 ton)
PROJECT DESCRIPTION:
CTH I - Center Rd to Shady Lane; 2.5" Overlay (1 Mile) (2,600 ton)
PROJECT DESCRIPTION:
Safe Streets and Roads for All (SS4A) Federal Grant; 20% Cost Share
Total Cost $250,000
CTH Y - CTH Y (Granville Rd) & CTH T (Lakefield Rd); Concrete Reconstruction
CHI Funding (50%); Engineering in 2026; Construction in 2027; BID Work; LRIP due June 2027
Total Cost $100,000
CTH W - CTH W (Port Washington Rd) & CTH C (Pioneer Rd) Traffic Signal Improvements
HSIP Funding (90/10)
Total Cost $1,700,000
Page 29 of 63
PROJECT NAME
STRATEGIC
OBJECTIVE
PRIMARY SOURCE OF
FUNDING
FUNDING SOURCE
COMMENT 2027 2028 2029 2030 2031 TOTAL
CTH W Road Network Tax Levy (Budget Process) 50,000 50,000
PRIORITY: Required
PROJECT NAME
STRATEGIC
OBJECTIVE
PRIMARY SOURCE OF
FUNDING
FUNDING SOURCE
COMMENT 2027 2028 2029 2030 2031 TOTAL
CTH KW Road Network Tax Levy (Budget Process) 700,000 700,000 -
PRIORITY: Required
PROJECT NAME
STRATEGIC
OBJECTIVE
PRIMARY SOURCE OF
FUNDING
FUNDING SOURCE
COMMENT 2027 2028 2029 2030 2031 TOTAL
CTH I Road Network Tax Levy (Budget Process) 275,000 275,000 -
PRIORITY: Required
PROJECT NAME
STRATEGIC
OBJECTIVE
PRIMARY SOURCE OF
FUNDING
FUNDING SOURCE
COMMENT 2027 2028 2029 2030 2031 TOTAL
CTH I Road Network Tax Levy (Budget Process) 275,000 275,000
PRIORITY: Required
PROJECT NAME
STRATEGIC
OBJECTIVE
PRIMARY SOURCE OF
FUNDING
FUNDING SOURCE
COMMENT 2027 2028 2029 2030 2031 TOTAL
CTH I Road Network Tax Levy (Budget Process) 300,000 300,000
PRIORITY: Required
PROJECT NAME
STRATEGIC
OBJECTIVE
PRIMARY SOURCE OF
FUNDING
FUNDING SOURCE
COMMENT 2027 2028 2029 2030 2031 TOTAL
CTH KW Road Network Other (explain in comme State/Cty Levy 300,000 300,000 -
PRIORITY: Required
PROJECT NAME
STRATEGIC
OBJECTIVE
PRIMARY SOURCE OF
FUNDING
FUNDING SOURCE
COMMENT 2027 2028 2029 2030 2031 TOTAL
CTH KW Road Network Other (explain in comme State/Cty Levy 850,000 850,000
PRIORITY: Required
PROJECT NAME
STRATEGIC
OBJECTIVE
PRIMARY SOURCE OF
FUNDING
FUNDING SOURCE
COMMENT 2027 2028 2029 2030 2031 TOTAL
CTH KW Road Network Tax Levy (Budget Process) 800,000 800,000
PRIORITY: Required
PROJECT NAME
STRATEGIC
OBJECTIVE
PRIMARY SOURCE OF
FUNDING
FUNDING SOURCE
COMMENT 2027 2028 2029 2030 2031 TOTAL
CTH KW Road Network Other (explain in comme State/Cty Levy 850,000 850,000 -
PRIORITY: Required
PROJECT DESCRIPTION:
PROJECT DESCRIPTION:
CTH KW - CTH H to Lake Drive (Northern Half) Reconsturction with 5" Paving (1 mile) (6,400 ton)
PROJECT DESCRIPTION:
CTH KW - CTH H to Lake Drive (Northern Half) Reconstruction
CHI Funding (50%)
Total Project Cost $1,700,000
PROJECT DESCRIPTION:
CTH KW - CTH H to Lake Drive (Southern Half); Reconstruction
CHI Funding (50%)
Total Project Cost $1,700,000
CTH KW - CTH H to Lake Drive Reconstruction
CHI Funding (50%)
Total Project Cost $600,000
CTH I - Shady Ln to Hawthorne Drive; 2.5" Overlay (1 mile) (2,500 ton)
PROJECT DESCRIPTION:
CTH I - Hawthorne Dr to River Park Rd; 2.5" Overlay (1 mile) (2,500 ton)
PROJECT DESCRIPTION:
CTH I - River Park Rd to CTH A/H; 2.5" Overlay (1 mile) (2,700 ton)
PROJECT DESCRIPTION:
CTH W - Traffic Signal Cabinet; Traffic Signal Replacement
PROJECT DESCRIPTION:
CTH KW - CTH H to Lake Drive; Reconstruction with 5" Paving (1.2 miles) (6,400 ton)
PROJECT DESCRIPTION:
Page 30 of 63
Route Location Mileage Description Type Total
Cost Budget PASER Asphalt
(Tons) Comments
I Cedar Sauk Rd to STH 33 1.8 2.5" Overlay;
Widen to 30' Resurface $600,000 $600,000 7 4,550 Altered Limits to Cedar Sauk Rd to STH 33. (40% of original
$1,200k)
K CTH KW to Termaat Rd 0.3 2.5" Overlay;
Widen to 28' Resurface $110,000 $110,000 6 900
I CTH Z to Fredonia-Kohler Rd 0.2 2.5" Overlay Resurface $60,000 $60,000 6 450 Additional work/cost for Curb & Gutter?
I STH 33 to Center Road 1.0 2.5" Overlay Resurface $300,000 $300,000 6 2,700
I Center Rd to Shady Lane 1.0 2.5" Overlay Resurface $300,000 $300,000 6 2,600
$1,370,000 $1,370,000 11,200
Route Location Mileage Description Type Total
Cost Budget PASER Asphalt
(Tons) Comments
W CTH W (Port Washington Rd) &
CTH C (Pioneer Rd) Traffic Signals -- Signal Improvements Intersection $1,700,000 $170,000 -- 0 HSIP Const (90/10); Design in 2025/2026; Const in 2028
Y CTH Y (Granville Rd) & CTH T
(Lakefield Rd) -- Concrete Reconstruction Intersection $100,000 $50,000 -- 0 CHI Funding (50%); Engr in 2026; Const in 2027; BID WORK; LRIP
due June 2027.
Cty
Hwys
Comprehensive Safety Action Plan
(CSAP) through SS4A -- Safety Improvements County Hwy System $250,000 $50,000 -- 0 Safe Streets and Roads for All (SS4A) Federal Grant; 20% Cost Share
W Traffic Signal Cabinet -- Traffic Signal Repl Intersection $50,000 $50,000 -- 0 Replacement Traffic Signal Cabinet
$2,100,000 $320,000
$3,470,000 $1,690,000
Route Location Mileage Description Type Total
Cost Budget PASER Asphalt
(Tons) Comments
KW CTH to Lake Drive
(Southern Half) 1.2 Reconstruction with 5"
Paving Reconstruction $700,000 $700,000 6 6,400
I Shady Ln to Hawthorne Drive 1.0 2.5" Overlay Resurface $275,000 $275,000 6 2,500
I Hawthorne Dr to River Park Rd 1.0 2.5" Overlay Resurface $275,000 $275,000 6 2,500
I River Park Rd to CTH A/H 1.0 2.5" Overlay Resurface $300,000 $300,000 6 2,700
$1,550,000 $1,550,000 14,100
Route Location Mileage Description Type Total
Cost Budget PASER Asphalt
(Tons) Comments
KW CTH H to Lake Drive 2.0 Reconstruction Reconstruction $600,000 $300,000 6 0 CHI Funding (50%); Engr in 2026; Const in 2027; BID WORK; LRIP
due June 2029. Paving by Oz Cty.
KW CTH H to Lake Drive
(Southern Half) 1.0 Reconstruction Reconstruction $1,700,000 $850,000 6 CHI Funding (50%); Engr in 2026; Const in 2027; BID WORK; LRIP
due June 2029. Paving by Oz Cty.
$1,700,000 $850,000
$3,250,000 $2,400,000
Ozaukee County Highway Department
5-Year Capital Improvement Plan (CIP): 2027-2031
Thursday, July 9, 2026
2027
OZAUKEE COUNTY HIGHWAY DEPARTMENT
OUTSIDE WORKLOAD
2028
OZAUKEE COUNTY HIGHWAY DEPARTMENT
OUTSIDE WORKLOAD
Page 31 of 63
Route Location Mileage Description Type Total
Cost Budget PASER Asphalt
(Tons) Comments
KW CTH to Lake Drive
(Northern Half) 1.0 Reconstruction with 5"
Paving Reconstruction $800,000 $800,000 6 6,400
$800,000 $800,000 6,400
Route Location Mileage Description Type Total
Cost Budget PASER Asphalt
(Tons) Comments
KW CTH H to Lake Drive
(Northern Half) 1.0 Reconstruction Reconstruction $1,700,000 $850,000 5 CHI Funding (50%); Engr in 2026; Const in 2027; BID WORK; LRIP
due June 2029. Paving by Oz Cty.
$1,700,000 $850,000
$2,500,000 $1,650,000
Route Location Mileage Description Type Total
Cost Budget PASER Asphalt
(Tons) Comments
I Jay Road to
Sheboygan County Line 1.3 Pulverize & Repave;
Widen to 24' Resurface $550,000 $550,000 6 4,500 Pulverize ($20,000); Ditch Grading ($40,000)
O Cedar Sauk Road to STH 33 1.0 2.5" Mill & Repave Resurface $500,000 $500,000 6 3,600 Re-do Curb & Gutter with V-Saukville Cost Share?
O STH 60 to Hickory Street 0.8 2.5" Mill & Repave Resurface $300,000 $300,000 6 2,500 Re-do Curb & Gutter with V-Grafton Cost Share?
$1,350,000 $1,350,000 10,600
Route Location Mileage Description Type Total
Cost Budget PASER Asphalt
(Tons) Comments
$0 $0
$1,350,000 $1,350,000
Route Location Mileage Description Type Total
Cost Budget PASER Asphalt
(Tons) Comments
I Jay Road to
Sheboygan County Line 1.3 Pulverize & Repave;
Widen to 24' Resurface $550,000 $550,000 6 4,500 Pulverize ($20,000); Ditch Grading ($40,000)
O Cedar Sauk Road to STH 33 1.0 2.5" Mill & Repave Resurface $500,000 $500,000 6 3,600 Re-do Curb & Gutter with V-Saukville Cost Share?
O STH 60 to Hickory Street 0.8 2.5" Mill & Repave Resurface $300,000 $300,000 6 2,500 Re-do Curb & Gutter with V-Grafton Cost Share?
$1,350,000 $1,350,000 10,600
Route Location Mileage Description Type Total
Cost Budget PASER Asphalt
(Tons) Comments
$0 $0
$1,350,000 $1,350,000
OUTSIDE WORKLOAD
2029
OZAUKEE COUNTY HIGHWAY DEPARTMENT
2030
OZAUKEE COUNTY HIGHWAY DEPARTMENT
OUTSIDE WORKLOAD
2031
OZAUKEE COUNTY HIGHWAY DEPARTMENT
OUTSIDE WORKLOAD
Page 32 of 63
DEPARTMENT: Highway - Equipment and Buildings
PROJECT NAME
STRATEGIC
OBJECTIVE
PRIMARY SOURCE OF
FUNDING
FUNDING
COMMENT 2027 2028 2029 2030 2031 TOTAL
Quad Axle Plow Truck Transportation Other (explain in comments Direct Project Charges 500,000 500,000
-
PRIORITY: Required
PROJECT NAME
STRATEGIC
OBJECTIVE
PRIMARY SOURCE OF
FUNDING
FUNDING
COMMENT 2027 2028 2029 2030 2031 TOTAL
Loader Tooth Bucket Transportation Other (explain in comments Direct Project Charges 25,000 25,000
-
PRIORITY: Required
PROJECT NAME
STRATEGIC
OBJECTIVE
PRIMARY SOURCE OF
FUNDING
FUNDING
COMMENT 2027 2028 2029 2030 2031 TOTAL
One Ton Truck Transportation Other (explain in comments Direct Project Charges 100,000 100,000
-
PRIORITY: Required
PROJECT NAME
STRATEGIC
OBJECTIVE
PRIMARY SOURCE OF
FUNDING
FUNDING
COMMENT 2027 2028 2029 2030 2031 TOTAL
Patrol Plow Truck Transportation Other (explain in comments Direct Project Charges 650,000 650,000
-
PRIORITY: Required
PROJECT NAME
STRATEGIC
OBJECTIVE
PRIMARY SOURCE OF
FUNDING
FUNDING
COMMENT 2027 2028 2029 2030 2031 TOTAL
Highway Equipment Transportation Other (explain in comments Direct Project Charges 635,000 685,000 640,000 1,960,000
-
PRIORITY: Required
PROJECT NAME
STRATEGIC
OBJECTIVE
PRIMARY SOURCE OF
FUNDING
FUNDING SOURCE
COMMENT 2027 2028 2029 2030 2031 TOTAL
PW - Wash Bay Door Transportion Planning Other (explain in comments Direct Project Charges 30,000 30,000
-
PRIORITY: Required
PROJECT NAME
STRATEGIC
OBJECTIVE
PRIMARY SOURCE OF
FUNDING
FUNDING SOURCE
COMMENT 2027 2028 2029 2030 2031 TOTAL
PW Shed E: Insulate & Heat Transportion Planning Other (explain in comments Direct Project Charges 550,000 550,000
-
PRIORITY: Required
The purchase of a One Ton Truck to replace #50
PROJECT DESCRIPTION:
The purchase of a Patrol Plow Truck
Part of replacement program established by Highway Department to ensure equipment is in good working order. Replaces current equipment due to wear and tear,
and high hours. Detailed plan available
PROJECT DESCRIPTION:
PROJECT DESCRIPTION:
The purchase of a Quad Axle Plow Truck to replace #78
Quad Axle Truck - $340,000
Attachments (Underbody Scraper - $20,000; Wings - $38,000; Plow - $20,000; Vbox - $60,000; Brine System - $22,000)
PROJECT DESCRIPTION:
The purchase of a Loader Tooth Bucket
PROJECT DESCRIPTION:
PROJECT DESCRIPTION:
PROJECT DESCRIPTION:
Additional Heated Storage at Port Washington location
Replace Wash Bay Door at Port Washington location
Page 33 of 63
PROJECT NAME
STRATEGIC
OBJECTIVE
PRIMARY SOURCE OF
FUNDING
FUNDING SOURCE
COMMENT 2027 2028 2029 2030 2031 TOTAL
PW Repave Yard Transportion Planning Other (explain in comments Direct Project Charges 350,000 350,000
-
PRIORITY: Required
PROJECT NAME
STRATEGIC
OBJECTIVE
PRIMARY SOURCE OF
FUNDING
FUNDING SOURCE
COMMENT 2027 2028 2029 2030 2031 TOTAL
PW - Paint Building E Transportion Planning Other (explain in comments Direct Project Charges 25,000 25,000
-
PROJECT DESCRIPTION:
PRIORITY: Required
PROJECT NAME
STRATEGIC
OBJECTIVE
PRIMARY SOURCE OF
FUNDING
FUNDING SOURCE
COMMENT 2027 2028 2029 2030 2031 TOTAL
PW - Reroof Shed B Transportion Planning Other (explain in comments Direct Project Charges 50,000 50,000
-
PROJECT DESCRIPTION:
PRIORITY: Required
PROJECT NAME
STRATEGIC
OBJECTIVE
PRIMARY SOURCE OF
FUNDING
FUNDING SOURCE
COMMENT 2027 2028 2029 2030 2031 TOTAL
PW - Salt Dome Door Transportion Planning Other (explain in comments Direct Project Charges 100,000 100,000
-
PROJECT DESCRIPTION:
PRIORITY: Required
PROJECT NAME
STRATEGIC
OBJECTIVE
PRIMARY SOURCE OF
FUNDING
FUNDING SOURCE
COMMENT 2027 2028 2029 2030 2031 TOTAL
Cedarburg - Salt Dome Door Transportion Planning Other (explain in comments Direct Project Charges 100,000 100,000
-
PROJECT DESCRIPTION:
PRIORITY: Required
Replace Salt Dome roll up door at Cedarburg location
Reroof Shed B at Port Washington location
Replace Salt Dome roll up door at Port Washington location
PROJECT DESCRIPTION:
Paint Building E at Port Washington location
Repave Yard at Port Washington location
Page 34 of 63
Item: 7.a.
Agenda Item Information Sheet
To: Public Works Committee
From: Jon Edgren, Public Works Director
Meeting Date: September 17, 2026
Department/Office: Facilities
Item Name: Management/Financial/Informational Reports
Summary:
Facilities Financials - Sept 2026
Recommended Action:
None
Attachments:
1. Facilities Financials - Sept 2026
Page 35 of 63
Current
Month
Actual
2026
YTD
Actual
2026
Amended
Budget
Budget
Balance
%
Budget
YTD
Revenues
Interdepartmental Charges $6,253 $50,020 $76,530 $26,51 0 65.36%
Other Revenue - $712 - ($712) 0.00%
Total Revenues $6,253 $50,732 $76,530 $25,798 66.29%
Expenditures
Salaries $176,347 $637,639 $810,348 $172,709 78.69%
Fringe Benefits $23,486 $194,166 $261,830 $67,664 74.16%
Travel/Training - - $100 $100 0.00%
Supplies $6,874 $65,419 $123,132 $57,713 53.13%
Purchased Services $26,836 $268,644 $440,349 $171,705 61 .01%
Interdepartment Charges $4,357 $43,949 $58,576 $14,627 7 5.03%
Other Expenses $2,270 $2,270 $2,270 - 100.00%
Total Operating Expenditures $240,170 $1,212,087 $1,69 6,605 $484,518 71.44%
Capital Outlay
Total Expenditures $240,170 $1,212,087 $1,696,605 $484, 518 71.44%
Net Increase (Decrease) ($233,917) ($1,161,355) ($1,62 0,075) ($458,720) 71.69%
E q u i t y:
Governmental Fund Balance ($1,503,983) - - - 0.00%
Ozaukee County Committee Report
General Fund Facilities Management
For the Eight Months Ending Monday, August 31, 2026
Profit and Loss Statement ACTUAL TO AMENDED BUDGET
CommRpt2026 2026 Oversight Comm Recommended PnL Amen ded Bdgt 9/8/2026
Page 36 of 63
Current
Month
Actual
2026
YTD
Actual
2026
Amended
Budget
Budget
Balance
%
Budget
YTD
Revenues
Taxes $9,566 $76,527 $114,791 $38,264 66.67%
Public Charges for Services $11,250 $108,158 $244,378 $ 136,220 44.26%
Interest Revenue - - $10,000 $10,000 0.00%
Other Revenue - - $3,000 $3,000 0.00%
Total Revenues $20,816 $184,685 $372,169 $187,484 49.62%
Expenditures
Salaries $10,719 $75,514 $99,909 $24,395 75.58%
Fringe Benefits $3,970 $33,280 $45,202 $11,922 73.63%
Travel/Training - - $501 $501 0.00%
Supplies $1,860 $25,043 $24,677 ($366) 101.48%
Purchased Services $24,666 $211,914 $183,804 ($28,110) 1 15.29%
Interdepartment Charges $327 $6,290 $11,824 $5,534 53.20 %
Other Expenses $5,251 $8,610 $6,251 ($2,359) 137.74%
Total Operating Expenditures $46,793 $360,651 $372,168 $11,517 96.91%
Capital Outlay
Total Expenditures $46,793 $360,651 $372,168 $11,517 96. 91%
Net Increase (Decrease) ($25,977) ($175,966) $1 $175,96 7
-
1759660
0.00%
E q u i t y:
Governmental Fund Balance - ($122,425) - $122,425 0.00%
Ozaukee County Committee Report
Special Revenue Fund Fair Grounds
For the Eight Months Ending Monday, August 31, 2026
Profit and Loss Statement ACTUAL TO AMENDED BUDGET
CommRpt2026 2026 Oversight Comm Recommended PnL Amen ded Bdgt 9/8/2026
Page 37 of 63
Item: 8.a.1.
Agenda Item Information Sheet
To: Public Works Committee
From: Kerise Zutz, Transit Superintendent
Meeting Date: September 17, 2026
Department/Office: Transit
Item Name: Unaccompanied Minors and Child Safety Restraints Rules
Summary:
BACKGROUND INFORMATION:
Ozaukee County Transit Services (OCTS) periodically reviews its Rider Rules and Regulations
to support a safe, consistent, and accessible Shared-Ride Taxi service. The current written rules
do not establish a minimum age for a child to ride independently. They also do not fully
document OCTS’s existing operating practices regarding child safety seats and booster seats.
The Federal Transit Administration permits a transit system to establish a minimum age for
children riding without a parent or guardian. OCTS is proposing revisions to establish age 12 as
the minimum age for independent travel. The revisions will also formally document the child-
restraint procedures already followed by OCTS and its contracted operator.
ANALYSIS:
The primary policy change is the establishment of age 12 as the minimum age for riding
independently. This age was selected to align with Washington County’s Shared-Ride Taxi
minimum-age requirement and provide a consistent rule for riders using the Washington-
Ozaukee Transit Connection.
Under the proposed revisions, children younger than 12 must be accompanied by a responsible
adult. Children age 12 and older may ride independently. Drivers and dispatchers do not provide
childcare or assume responsibility for an unattended child before pickup or after drop-off.
The remaining revisions formalize existing OCTS operating practices regarding seat belts, child
safety seats, and booster seats. All passengers must use the vehicle’s seat belt or other occupant-
restraint system while the vehicle is moving.
A child who requires a child safety seat or booster seat must travel with a responsible adult. The
accompanying adult is responsible for providing, installing, and properly securing the
appropriate child safety seat or booster seat. OCTS and its contracted operator will not provide,
install, or secure child safety seats or booster seats.
The written rules will also document the applicable child-restraint requirements. A child younger
than 1 year old or weighing less than 20 pounds must use a rear-facing child safety seat. A child
who is at least 1 year old and weighs at least 20 pounds, but is younger than 4 years old or
Page 38 of 63
weighs less than 40 pounds, must use an appropriate forward-facing or rear-facing child safety
seat. A child who is at least 4 years old but younger than 8 years old, weighs at least 40 pounds
but not more than 80 pounds, and is no taller than 4 feet 9 inches must use an appropriate child
safety seat or booster seat.
These revisions will establish a clear minimum age for independent travel while formally
documenting OCTS’s existing child restraint practices for riders.
FISCAL IMPACT:
Balance Current Year: ---
Next Year's Estimated Cost: ---
FUNDING SOURCE:
County Levy: ---
Non-County Levy: ---
Recommended Action:
Approve the updated Ozaukee County Transit Services Rider Rules and Regulations establishing
age 12 for riders as unaccompanied minors and requirement of child safety restraints, effective
November 1, 2026.
Attachments:
None
Page 39 of 63
Item: 8.b.
Agenda Item Information Sheet
To: Public Works Committee
From: Kerise Zutz, Transit Superintendent
Meeting Date: September 17, 2026
Department/Office: Transit
Item Name: Management/Financial/Informational Reports
Summary:
Transit Ridership Update — Sept 2026
Transit Financials — Sept 2026
Recommended Action:
None
Attachments:
1. PWC - Monthly Transit Ridership - Sept 2026
2. Transit Financials - Sept 2026
Page 40 of 63
MONTH
SERVICE
DAYS IN
MONTH
TOTAL
TRIPS HOURS FAREBOX INVOICE LESS FARES COST/
TRIP
NET
COST/
TRIP
January 30 9,064 5,546 $ 33,182.30 $ 204,320.90 $ 171,138.60 $ 22.54 $ 18.88
February 28 8,837 5,136 $ 33,288.82 $ 185,538.39 $ 152,249.57 $ 21.00 $ 17.23
March 31 8,943 5,465 $ 33,114.20 $ 206,897.25 $ 173,783.05 $ 23.14 $ 19.43
April 30 9,061 4,917 $ 31,865.46 $ 181,141.05 $ 149,275.59 $ 19.99 $ 16.47
May 30 8,229 4,625 $ 32,821.18 $ 161,006.15 $ 128,184.97 $ 19.57 $ 15.58
June 30 8,357 4,656 $ 31,828.35 $ 171,530.72 $ 139,702.37 $ 20.53 $ 16.72
July 30 8,474 4,775 $ 31,235.76 $ 175,919.10 $ 144,683.34 $ 20.76 $ 17.07
August 31 8,425 4,775 $ 31,235.76 $ 175,919.10 $ 144,683.34 $ 20.88 $ 17.17
September 29
October 31
November 29
December 30
ANNUAL
TOTAL 359 69,390 39,895 $ 258,571.83 $ 1,462,272.66 $ 1,203,700.83 $ 21.05 $ 17.32
Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec Totals Average
2010 Monthly Ridership 5,820 5,665 6,795 6,251 5,803 5,858 5,928 5,666 6,353 6,870 6,870 6,709 74,588 6,216
2011 Monthly Ridership 6,479 5,819 7,561 6,724 6,786 6,433 5,850 6,775 6,872 6,997 6,854 6,736 79,886 6,657
2012 Monthly Ridership 7,780 7,901 7,811 7,240 7,721 6,875 6,769 7,511 7,193 8,807 7,869 7,274 90,751 7,563
2013 Monthly Ridership 8,343 7,809 8,221 8,148 8,403 7,356 7,619 7,612 7,727 8,778 8,202 8,102 96,320 8,027
2014 Monthly Ridership 8,238 9,244 10,091 10,203 10,106 9,204 8,983 8,475 9,004 9,863 8,461 8,719 110,591 9,216
2015 Monthly Ridership 8,900 8,835 9,812 9,523 9,208 9,030 8,611 8,496 9,070 9,613 8,578 8,837 108,513 9,043
2016 Monthly Ridership 9,448 9,601 9,968 9,830 9,282 9,172 8,642 9,374 9,345 9,915 9,547 9,445 113,569 9,464
2017 Monthly Ridership 10,218 9,810 10,512 9,399 9,732 9,222 8,773 9,934 9,543 10,338 9,584 9,214 116,279 9,690
2018 Monthly Ridership 10,143 9,513 10,122 9,565 9,764 8,805 8,376 9,173 8,746 10,245 9,259 8,424 112,135 9,345
2019 Monthly Ridership 8,816 9,252 9,921 10,021 9,648 8,337 8,056 8,798 8,609 9,667 8,535 8,046 107,706 8,976
2020 Monthly Ridership 9,024 8,706 6,011 2,549 2,717 4,275 5,135 5,205 5,926 6,155 5,308 5,456 66,467 5,539
2021 Monthly Ridership 5,568 6,103 6,443 6,396 5,814 6,140 5,770 6,022 5,970 6,083 5,924 6,194 72,427 6,036
2022 Monthly Ridership 6,091 6,263 5,783 6,429 6,097 6,328 5,924 7,163 7,134 7,248 6,852 6,453 77,765 6,480
2023 Monthly Ridership 7,326 6,853 7,678 6,926 7,499 6,761 6,251 7,035 6,714 7,412 6,929 6,535 83,919 6,993
2024 Monthly Ridership 7,447 7,748 7,387 8,082 7,823 7,082 7,776 7,930 7,982 8,681 7,801 7,665 93,404 7,784
2025 Monthly Ridership 8,408 8,101 8,200 8,305 7,968 7,729 7,985 8,247 8,855 9,304 7,835 8,752 99,689 8,307
2026 Monthly Ridership 9,064 8,837 8,943 9,061 8,229 8,357 8,474 8,425 69,390 8,674
Same month 2025 vs 2026 7.8% 9.1% 9.1% 9.1% 3.3% 8.1% 6.1% 2.2%
Same month 2026 vs 2019 2.8% -4.5% -9.9% -9.6% -14.7% 0.2% 5.2% -4.2%
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Totals Average
2021 N/A N/A N/A 82 80 136 156 125 102 132 126 93 1,032 115
2022 149 140 191 201 201 179 159 211 198 208 165 182 2,184 182
2023 215 202 212 169 181 182 183 231 239 219 195 210 2,438 203
2024 158 156 166 145 164 124 142 131 133 148 108 103 1,678 140
2025 120 101 127 124 141 144 148 143 135 156 122 144 1,605 134
2026 140 116 151 172 160 175 191 171 1,276 160
Same month 2025 vs 202617% 15% 19% 39% 13% 22% 29% 20%
2026 OZ CO SHARED RIDE TAXI
Shared Ride Taxi (SRT) Ridership Report
Shared Ride Taxi (SRT): Cross-County Trips
Page 41 of 63
Current
Month
Actual
2026
YTD
Actual
2026
Amended
Budget
Budget
Balance
%
Budget
YTD
Revenues
Taxes $20,736 $165,886 $248,829 $82,943 66.67%
Intergovernmental Revenues - $354,641 $2,086,733 $1,732 ,092 17.00%
Public Charges for Services $39,092 $447,233 $562,250 $ 115,017 79.54%
Interest Revenue - $1,044 - ($1,044) 0.00%
Other Revenue - $133 $335,787 $335,654 0.04%
Total Revenues $59,828 $968,937 $3,233,599 $2,264,662 29 .96%
Expenditures
Salaries $9,982 $58,958 $150,157 $91,199 39.26%
Fringe Benefits $3,564 $21,959 $48,620 $26,661 45.16%
Travel/Training - $41 $4,503 $4,462 0.91%
Supplies $1,062 $118,485 $278,814 $160,329 42.50%
Purchased Services $5,369 $963,793 $2,343,050 $1,379,25 7 41.13%
Interdepartment Charges $2,211 $107,149 $154,602 $47,45 3 69.31%
Other Expenses $38,601 $38,601 $40,602 $2,001 95.07%
Total Operating Expenditures $60,789 $1,308,986 $3,020 ,348 $1,711,362 43.34%
Capital Outlay
Equipment & Furniture - - $213,251 $213,251 0.00%
Total Capital Outlay - - $213,251 $213,251 0.00%
Total Expenditures $60,789 $1,308,986 $3,233,599 $1,924 ,613 40.48%
Net Increase (Decrease) ($961) ($340,049) - $340,049 0.0 0%
E q u i t y:
Governmental Fund Balance - ($2,587,705) - $2,587,705 0.00%
Ozaukee County Committee Report
Special Revenue Fund Transit Services
For the Eight Months Ending Monday, August 31, 2026
Profit and Loss Statement ACTUAL TO AMENDED BUDGET
CommRpt2026 2026 Oversight Comm Recommended PnL Amen ded Bdgt 9/8/2026
Page 42 of 63
Item: 9.a.1.
Agenda Item Information Sheet
To: Public Works Committee
From: Jon Edgren, Public Works Director
Meeting Date: September 17, 2026
Department/Office: Highway Department
Item Name: CTH H Bridge Repair
Summary:
BACKGROUND INFORMATION:
The CTH H (Cigrand Drive) Bridge (B-45-006) over the Milwaukee River has seen deterioration
over the last several years, and, based upon a 2024 inspection, we approached the Wisconsin
Department of Transportation (WisDOT) about applying for a bridge rehabilitation grant in Fall
of 2025. WisDOT denied inclusion of the bridge in their bridge grant program that was available
at the time.
In late March of 2026, we were notified of a hole in the bridge deck, so we shut down the bridge
until Andrew Leden, CORRE, could perform a structural inspection as Ozaukee County’s Bridge
Inspector.
By mid-April, we had re-opened the bridge with a steel plate over the hole to allow vehicular
traffic while we explored longer term solutions. (See attached inspection report.)
In late July, Mr. Leden performed a follow-up inspection on the bridge, and found that cracking
had expanded through the deck, so we closed the bridge to vehicular traffic again.
Given that the next round of WisDOT Bridge Grants likely won’t occur until Fall of 2027, we
sought a short term repair to the bridge that would last long enough to allow a future application
to WisDOT’s Bridge Grant program. The project would involve removing concrete between two
girders, establishing a new concrete form, tying in existing rebar, and pouring a new slab.
However, we’ve started to have significant concerns that the project would quickly expand
beyond the estimated $80,000 cost if the existing rebar isn’t in good shape, the existing concrete
can’t hold anchors or it’s difficult to remove the concrete without losing material into the
Milwaukee River.
Therefore, we’ve focused more on simply adding more steel plates down the centerline of the
CTH H Bridge as a potential option. We estimate $30,000 for the purchase of enough steel plates
to extend from pier to pier to cover the area that was showing expanded cracks.
That being said, leaving steel plates across the bridge would make it difficult to plow in Winter.
Page 43 of 63
Typically, we’d adjust our standard methods, and simply heavily salt the area. However, I think
that local residents and the Wisconsin Department of Natural Resources (WDNR) would have
serious complaints with heavy salting over the Milwaukee River.
At this point, we believe that we’re left with four viable options:
1) Put the repair out for bid.
2) Add steel plates within the center section of the bridge, and open the bridge to traffic.
3) Add steel plates within the center section of the bridge, but limit traffic from Spring to Fall
and close the bridge during Winter.
4) Keep the bridge closed until grant funds can be secured.
ANALYSIS:
Given concerns over soaring construction costs if the repair doesn’t go well and environmental
concerns over heavy salting above the Milwaukee River, our recommendation is to go with
Option #3 – Add steel plates within the center section of the bridge, but limit traffic from Spring
to Fall and close the bridge during Winter.
Additionally, given that we’re already entering Fall and would anticipate typically closing the
bridge in November for Winter, we would plan to leave the bridge closed until Spring at this
point.
As we enter Spring of 2027, we’d re-inspect the bridge, install the steel plates and re-open the
bridge to traffic.
FISCAL IMPACT:
Balance Current Year: ---
Next Year’s Estimated Cost: $30,000 to $100,000+
FUNDING SOURCE:
County Levy: X
Non-County Levy: ---
Indicate source: ---
Recommended Action:
Direct Highway Commissioner to move forward with CTH H Bridge in Waubeka Option #3 -
Add steel plates within the center section of the bridge, but limit traffic from Spring to Fall and
close the bridge during Winter.
Attachments:
1. CTH H (Waubeka) Bridge Insp - B-45-006 - 4-22-26
Page 44 of 63
1B-45-006 22-Apr-2026 inspection as of 27-Apr-2026
STATE OF WISCONSIN
DEPARTMENT OF TRANSPORTATION
Inspection Report for
B-45-006
CTH H over MILWAUKEE RIVER
Apr 22, 2026
Type Prior Date Prior Team Leader Frequency (mos) Performed
Routine 07-17-24 Leden, Andrew (9705) 12
Special 03-31-26 Leden, Andrew (9705) 0 X
SIA review 07-17-24 Leden, Andrew (9705) 48
SNBI 07-17-24 Leden, Andrew (9705) 0
UW profile 07-17-24 Leden, Andrew (9705) 96
Start Coordinates End Coordinates (optional)
Latitude 43°28'21.37" N Latitude
Longitude 87°59'25.50" W Longitude
Owner COUNTY Maintainer COUNTY
Team members
Time Log Hours
0
Minutes
20
Weather Temperature (f)
45
Condition
Partly Cloudy
Name Number Signature Signature Date
Inspector
Leden, Andrew
9705
Andrew Leden
04-27-26 E-signed by Andrew Leden(atleden)
Page 45 of 63
2B-45-006 22-Apr-2026 inspection as of 27-Apr-2026
BRIDGE INSPECTION REPORT
Wisconsin Department of Transportation
DT2007 2003 s.84.17 Wis. Stats.
page 2
Identification & Location
Feature On:
CTH H
Section Town Range:
S28 T12N R21E
Structure Number:
B-45-006 Feature Under:
MILWAUKEE RIVER
County:
OZAUKEE
Location
0.2M E JCT CTH I TO N
Municipality:
FREDONIA
Structure Name:
Geometry Traffic
measurements in feet, except where noted Lanes ADT ADT year Traffic Pattern
Approach Roadway Width:
22
Bridge Roadway Width:
24.0
Total Length:
231.3
On
2
2000
2019
two way traffic
Approach Pavement Width:
22
Deck Width:
34.6
Deck Area (sq ft):
8003
Capacity Load Rating
Inventory rating:
HS15
Overburden depth (in):
2.0
Last rating date:
11-03-21
Controlling:
INTERIOR GIRDER Positive Moment
Operating rating:
HS25
Deck surface material:
Low Slump Concrete
Control location:
3 - (60.0)
Posting:
Emergency Vehicle Weight Limit (tons):
Re-rate for capacity (Y/N):
Re-rate notes:
Hydraulic Classification
Scour Critical Code(113):
Stable- above top footing (8)
Q100 (ft3/sec):
0
High water elevation (ft):
0.0
Velocity (ft/sec):
0.0
Sufficiency #:
67.1
Field Measured Rail(s)
Rail Location Type Measurement (in)
Span(s)
Span # Material Configuration Depth (in) Length (ft) Main
1 CONT STEEL Girder/Beam - I-Shaped Spread 70.0
2 CONT STEEL Girder/Beam - I-Shaped Spread 85.0 Y
3 CONT STEEL Girder/Beam - I-Shaped Spread 70.0
Expansion joint(s) Temperature: File:45 New:45
Joint # Location Type Last inspection date Last measure (in) New measure (in)
1 SOUTH ABUTMENT STRIPSEAL 09-21-22 2.0
2 NORTH ABUTMENT STRIPSEAL 09-21-22 1.8
Clearance
Item File Measurement (ft) File Date New Measurement (ft)
Highway min vertical on cardinal
Horizontal on cardinal
Construction History
Year Work Performed FOS id
1946 New Structure
1985 Overlay - Concrete 0045-44-11
Page 46 of 63
3B-45-006 22-Apr-2026 inspection as of 27-Apr-2026
BRIDGE INSPECTION REPORT
Wisconsin Department of Transportation
DT2007 2003 s.84.17 Wis. Stats.
page 3 Structure No.:B-45-006
Maintenance Items History
Item Recommended by Status Status change Year completed
Deck - Seal Surface Cracks
Wood, Kevin (9521) COMPLETE 09/20/18 2018
Comment:
Status Comment:
Deck - Surface Repair Curb / Sidewalk
Wood, Kevin (9521) COMPLETE 09/20/18 2018
Comment:
Concrete surface repair of sidewalk curbs
Status Comment:
Expansion Joints - Clean
Wood, Kevin (9521) COMPLETE 09/20/18 2018
Comment:
North and south joints
Status Comment:
Misc - Repair / Replace Utilities or Signs
Wood, Kevin (9521) COMPLETE 09/20/18 2018
Comment:
Place correct bridge marker at NE corner
Status Comment:
Misc - Repair / Replace Utilities or Signs
Mertens, Michael (9516) COMPLETE 09/20/18 2018
Comment:
Place correct bridge markers at NW corner.
Status Comment:
Maintenance Items
Item Priority Recommended by Status Status change
Substructure - Repair
Abutment/Wings/Culverts
Low Leden, Andrew (9705) IDENTIFIED 07/17/24
Comment:
Concrete surface repair of abutments
Status Comment:
Expansion Joints - Clean
Low Leden, Andrew (9705) IDENTIFIED 07/17/24
Comment:
Clean north and south expansion joints.
Status Comment:
Deck - Surface Repair Curb / Sidewalk
Low Leden, Andrew (9705) IDENTIFIED 08/15/24
Comment:
Concrete surface repair of sidewalk curbs.
Status Comment:
Deck - Patching
High Leden, Andrew (9705) IDENTIFIED 04/01/26
Comment:
Repair concrete deck along CL of span 2. Large spalls present
with multiple exposed and severed rebar beneath full-depth hole in
deck/wearing surface.
If patching is too extensive due to unsound concrete, a deck
replacement project should be planned.
Status Comment:
Drainage - Repair/Replace Deck Drains/Inlets
High Leden, Andrew (9705) IDENTIFIED 04/01/26
Comment:
Replace drainage chutes under deck to prevent water from
spilling onto girders
Status Comment:
Misc - Repair / Replace Utilities or Signs
Medium Leden, Andrew (9705) IDENTIFIED 04/27/26
Comment:
Add BUMP or STEEL PLATES AHEAD signage at bridge.
Status Comment:
Page 47 of 63
4B-45-006 22-Apr-2026 inspection as of 27-Apr-2026
BRIDGE INSPECTION REPORT
Wisconsin Department of Transportation
DT2007 2003 s.84.17 Wis. Stats.
page 4 Structure No.:B-45-006
Elements
Quantity in Condition State
Chk Element Defect Description UOM Total 1 2 3 4
X 12
Reinforced Concrete Deck SF 8,003 0 6,572 1,387 44
Damp soffit around drains. Approximately 4.5' of concrete deck exposed between beam flanges.
1080
Delamination - Spall - Patched Area SF 0 0 137 44
Deck end haunches @ piers in poor condition w/spalls, exposed rebar & leaching. Steel girders below are
corroding. Cracks & scaling throughout. Spalls around drains.
Span 1: 2 SF CS3 spalls at SW drain
Pier 1: 12 SF CS3 spalls and rust staining
Span 2: 2 SF CS3 spalls at SE drain. 3 SF CS3 spalls at NE drain. 4 SF spall with rebar, midspan bay 4. Major
spalling with multiple exposed rebar and half to full-thickness spalls in bay 3 along CL; CS4 adjacent to open
hole and north, CS3 concentrated in north half (28 CS3, 44 CS4). 9 SF CS3 spalls w rebar in west overhang. 1
SF CS3 spall east overhang.
Two 8' Wide x 14' Long x 1" thick steel plates were placed longitudinally along the CL spanning from G3-
G4, and extending north and south of the full-thickness hole in the deck. A load rating analysis was
completed for the steel plates as well as the superstructure with the additional dead load of the plates.
The 2 plates were pinned to the deck and wedged with asphalt.
Pier 2: 23 SF CS3 spalls w rebar and rust staining
Span 3: 16 SF CS3 spalls east overhang. 1 CS3 spall bay 4, south end. 6 SF CS3 spalls at NE drain. 21 SF
CS3 spalls w rebar west overhang, mostly over P2. 5 SF CS3 spalls N end bays 2/3. 4 SF CS3 spalls at bay 3
north haunch where joint is open.
1130
Cracking (RC) SF 0 1,600 1,250 0
South span 1: cracks w/ rust stains in middle bay (approx. 200 SF CS3 cracking/staining).
Middle span 2: heavy rust stains and leaching in bays 2 & 3 from the west, rust stains in half of bay 4 (approx.
750 SF CS3 cracking/staining; some overlaps spalling).
North span 3: rust stains in the north 10-ft of bays 1 & 2 from the west and most of middle bay (250 SF).
Rust stains/leaching at pier joints (50 SF CS3)
Est. 20% of deck underside with insignificant to moderate map cracking throughout. Some leaching evident
towards outer bays. (1600 SF CS2)
1190
Abrasion-Wear (PSC-RC) SF 0 4,972 0 0
Scattered popouts and scaling along the bottom face of concrete. Based on age of structure and scaling
present, remaining deck is CS2 condition
8209
Sidewalk SF 2,315 0 2,090 225 0
7.33' x 2 sides x 157.9' = 2315 SF
3210
Debonding/Spall/Patched Area/Pothole SF 0 2,090 225 0
East: 70 SF CS3 spalls with exposed rebar along curb, remainder with CS2 pop outs and abrasion.
West: 155 SF CS3 spalls with exposed rebar along curb, remainder with CS2 pop outs and abrasion. Spalls
mostly along curb face.
3220
Crack (Wearing Surface) SF 0 0 0 0
Map and transverse cracks throughout.
8511
HMA (AC) Overlay SF 5,688 3,685 464 1,539 0
Reduced qty to separate out sidewalk qty.
Thin sealcoat over top of 1.5” minimum concrete overlay, per 1985 plans.
3210
Debonding/Spall/Patched Area/Pothole SF 0 20 91 0
Span 1: 3 SF CS3 spalls, SB lane at southern joint
Pier 1: 9 SF CS3 spalls/hma patches, 8 SF delams along south edge.
Span 2: 32 SF CS3 Spalls along CL and midspan, 20 SF delams along CL to the north/south of large spall
Pier 2: 17 LF CS3 spalls/broken concrete
Span 3: 30 SF CS3 Spalls/broken concrete near North joint
3220
Crack (Wearing Surface) SF 0 444 311 0
Areas breaking up at pier joints. CS3 Transverse/diagonal cracks at ends and near piers, and throughout span
2.
Span 1: 42 SF CS3, 294 SF CS2
Span 2: 234 SF CS3, 60 SF CS2
Span 3: 35 SF CS3, 90 SF CS2
8911
Abrasion, Wear, or Rutting (Wear. Surf.) SF 0 0 1,137 0
Sealcoat is wearing off at C/L (full-length), surrounding spalls over piers and in the wheel lanes of all spans -
approximately 20% worn off - 1137 SF CS3 (some overlaps spalls/cracking).
Page 48 of 63
5B-45-006 22-Apr-2026 inspection as of 27-Apr-2026
BRIDGE INSPECTION REPORT
Wisconsin Department of Transportation
DT2007 2003 s.84.17 Wis. Stats.
page 5 Structure No.:B-45-006
107
Steel Open Girder LF 1,347 455 368 524 0
Girders numbered 1-6 from W to E
33" x 11 3/4" spaced at 5'-1"
1000
Corrosion LF 0 368 524 0
Generally minor light rust.
South span - west fascia w/ bottom flange edge rust, east fascia has freckle rust (140 LF CS3). G1 & G6 minor
SL at abut bearing (4 LF CS3).
Middle span - freckle rust all girders (340 LF CS2). <5% SL to top and bottom flange of G3 & G4 full length (170
LF CS3).
North span - laminate rust at girder ends 1, 2 & 3 from west at N. abutment (15 LF CS3). Bottom flange edge
rust at both fascias (135 LF CS3). 10% of interior girders have blush or freckle rust (28 LF CS2).
Laminate rust @ pier bearing stiffeners (10-ft each girder = 60 LF CS3).
8516
Painted Steel SF 11,993 0 10,194 1,199 600
3440
Effectiveness (Steel Protective Coatings) SF 0 10,194 1,199 600
5% of steel with heavy or laminate rust at piers and north abutment (600 SF). Remainder with freckle, blush,
or edge rust (10% CS3 = 1199 SF).
113
Steel Stringer LF 462 358 75 29 0
Sidewalk support between exterior brackets.
1000
Corrosion LF 0 75 29 0
Some section loss @ piers (24 LF CS3). Laminate rust at south abutment, west stringer (5 LF CS3). Blush rust
beginning on scattered areas, approx 75 LF CS2.
152
Steel Floor Beam LF 250 0 250 0 0
Sidewalk brackets.
1000
Corrosion LF 0 250 0 0
Freckle rust typical.
205
Reinforced Concrete Column EA 4 2 1 1 0
1080
Delamination - Spall - Patched Area EA 0 1 1 0
Shallow spall w rebar @ west column of south pier. (1 CS3)
Minor delam/cracking @ east column of north pier.
215
Reinforced Concrete Abutment LF 84 12 19 53 0
1080
Delamination - Spall - Patched Area LF 0 0 53 0
Heavy spalls/delams w/exp rebar @ south abutment (32-ft). Delams and spalls w/exp rebar @ north abutment
(21-ft). Spalls on backwall @ north abutment.
1130
Cracking (RC) LF 0 19 0 0
Narrow horiz. cracks on backwall of south abutment (5-ft). Narrow horiz. cracks on backwall of north abutment
(14-ft).
234
Reinforced Concrete Cap LF 71 41 18 12 0
1080
Delamination - Spall - Patched Area LF 0 16 12 0
Multiple spalls w/ exposed rebar on north pier, S face (6 LF CS3).
Delam @ north pier, west end (6 LF CS2)
2 spalls on south pier, N face (4 LF CS3).
Delam and spalls w rebar on bottom of S pier, S face (10 LF CS2, 2 LF CS3).
1130
Cracking (RC) LF 0 2 0 0
Shear crack at south pier ends. 4-ft horizontal crack on bottom of south pier. Insig vert cracks at S pier
(covered in delam).
Vert. crack at center & E side of N pier (2 LF CS2).
Page 49 of 63
6B-45-006 22-Apr-2026 inspection as of 27-Apr-2026
BRIDGE INSPECTION REPORT
Wisconsin Department of Transportation
DT2007 2003 s.84.17 Wis. Stats.
page 6 Structure No.:B-45-006
300
Strip Seal Expansion Joint LF 56 0 54 0 2
At abutments
2310
Leakage, Seal Adhesion, Damage,Cracking LF 0 10 0 0
leaks, causing corrosion of steel girders below. Leakage in middle 20% of north abutment - not present during
03/2026 inspection
2350
Debris Impaction LF 0 44 0 0
North: full of loose debris (CS2)
South: full of loose debris (CS2)
2360
Adjacent Deck or Header Damage LF 0 0 0 2
Transverse header cracks. North header with large, full depth spall at CL exposing deck underside and
expansion joint reinforcing steel (2 LF CS4)
302
Compression Joint Seal LF 56 0 0 48 8
At piers
2310
Leakage, Seal Adhesion, Damage,Cracking LF 0 0 48 8
Deterioration of deck below. Loss of adhesion throughout due to spalling and delaminations full-length at each.
Seal is damaged and discontinuous at center of S pier (3 LF CS4).
Seal is bulging and torn at N pier, West and East ends (4 LF CS4). Discontinuous at CL and torn (1 LF CS4).
2360
Adjacent Deck or Header Damage LF 0 0 0 0
Spalling around edges of gland. Counted under wearing surface defects.
306
Other Joint LF 19 17 0 2 0
Sliding plate joint at sidewalks
2310
Leakage, Seal Adhesion, Damage,Cracking LF 0 0 2 0
NE joint is corroded through thickness at 2 places, 2-in x 4-in hole. (covered by new plate)
SE plate bent and damaged (2 LF CS3)
310
Elastomeric Bearing EA 12 0 12 0 0
Neutral position at 70 degrees both abutments.
1000
Corrosion EA 0 12 0 0
Shim blocks all with CS2 corrosion.
311
Moveable Bearing EA 6 0 0 6 0
South pier
1000
Corrosion EA 0 0 6 0
All rockers @ south pier have hvy corrosion.
313
Fixed Bearing EA 6 0 3 3 0
North pier
1000
Corrosion EA 0 3 3 0
Laminate rust at bottom plate at 2 bearings at north pier. 3 eastern = CS3
330
Metal Bridge Rail LF 462 0 370 92 0
1000
Corrosion LF 0 370 92 0
Surface rust throughout. Laminate rust beginning to form at base of vertical pickets & horizontals.
Estimate 20% CS3 corrosion (92 LF)
1900
Distortion LF 0 0 0 0
Slight impact damage to east rail, 5th panel from north.
Also impact to post on west side, 10th post from north.
(4 LF CS2 covered in corrosion)
Page 50 of 63
7B-45-006 22-Apr-2026 inspection as of 27-Apr-2026
BRIDGE INSPECTION REPORT
Wisconsin Department of Transportation
DT2007 2003 s.84.17 Wis. Stats.
page 7 Structure No.:B-45-006
8400
Integral Wingwall EA 4 2 2 0 0
8903
Wall Deterioration EA 0 2 0 0
Exposed rebar due to low cover @ SE wing, crack in NW wing.
Assessments
Quantity in Condition State
Chk Element Defect Description UOM Total 1 2 3 4
9001
Drainage - Ends of Structure EA 4 4 0 0 0
Bare slope. Conc @ SE.
9004
Drainage EA 8 0 0 0 8
Drain chutes corroded & allow leakage onto girders. Grates are open.
9011
Utilities EA 1 0 1 0 0
Gas line, 3". Several bent/corroded hanger rods
9030
Signs - Object Markers EA 4 4 0 0 0
Good
9045
Slope Protection- Riprap EA 2 1 0 1 0
North slope mostly exposed. No undermining.
9167
Steel Diaphragm EA 73 0 63 10 0
Heavy corrosion @ N. abut (3 ea) & piers (6 ea);
Center diaphragm, center span has SL (1 ea)
9323
Approach Roadway - Asphalt EA 2 2 0 0 0
OK
Condition Ratings
File New
Deck condition rating (C.01) Imminent Failure (1) Serious (3)
Superstructure condition rating (C.02) Satisfactory (6) Satisfactory (6)
Substructure condition rating (C.03) Satisfactory (6) Satisfactory (6)
Culvert condition rating (C.04) N/A (Nbi) (N) N/A (Nbi) (N)
Bridge railings condition rating (C.05) Fair (5) Fair (5)
Bridge railing transitions condition rating (C.06) N/A (N) N/A (N)
Bridge bearings condition rating (C.07) Fair (5) Fair (5)
Bridge joints condition rating (C.08) Poor (4) Poor (4)
Channel condition rating (C.09) Good (7) Good (7)
Channel protection condition rating (C.10) Good (7) Good (7)
Scour condition rating (C.11) Some Minor (7) Some Minor (7)
Channel Minor Damage (7) Minor Damage (7)
Waterway Equal Desirable (8) Equal Desirable (8)
Approach Good- No speed reduction (8)
Structure Specific Notes
Deck Condition = 3, "Major Defects with corrective actions to keep bridge open." Temporary steel plates installed to allow
bridge to remain open.
Bridge vibrates under heavy truck loading.
Page 51 of 63
8B-45-006 22-Apr-2026 inspection as of 27-Apr-2026
BRIDGE INSPECTION REPORT
Wisconsin Department of Transportation
DT2007 2003 s.84.17 Wis. Stats.
page 8 Structure No.:B-45-006
Animal nesting/roosting presence on structure
Inspection Specific Notes
4/22 Special Inspection as Close-out inspection for critical finding. County placed 1" thick steel plates along CL of
structure based on load rating analysis of the plates and the superstructure. Bridge was reopened to traffic with no load
posting required, per BOS. Detour route and bridge closure devices have been removed. Plans being developed to
patch/repair deck as a long-term solution.
Special inspection initiated due to phone call (3/31/26) from County stating a full-depth hole had developed in the deck, span 2 at the
CL. Inspection focused on the deck, wearing surfaces and some substructure units with noted changes. Critical finding discovered
due to major spalling and section loss of the concrete deck beneath the hole in span 2, along the deck CL.
Notified Joel Maas of CF at 10:20am. Closed bridge to all traffic at 11:30am.
Reduced Deck condition to 1 due to closure of structure, reopen possible with repairs.
Inspector Site-Specific Safety Considerations
Routine Specific Procedures (prior)
Special Specific Procedures
Special Requirements
Chk Hours Cost Comments
Other Probing rod
Other Access
Equipment Hip waders
Page 52 of 63
9B-45-006 22-Apr-2026 inspection as of 27-Apr-2026
page 9 Structure No.:B-45-006
Underwater Probe Form
B-45-006
General Site Conditions - Scour
About 1-ft of local scour around north pier
General Site Conditions - Embankment Erosion/Conditions
Well vegetated
Substructure Notes
Chk Unit Max Water Depth(ft) Mode Channel Material Notes
X Cardinal 0.5 Wade Sand w/ Gravel North
X Pier 1 2.5 Wade Sand w/ Gravel South pier
X Pier 2 3.7 Wade Sand w/ Gravel North pier
(S side E column)
X Non Cardinal 0.0 Dry Silt South - Dry
Page 53 of 63
10B-45-006 22-Apr-2026 inspection as of 27-Apr-2026
page 10 Structure No.:B-45-006
Special Item 1
Longitudinal view looking North
b45-006_26_xtd1.jpg
Special Item 2
Longitudinal view looking South
b45-006_26_xtd3.jpg
Special Item 3
Steel Plates looking NW in Span 2
b45-006_26_xtd2.jpg
Linked Element(s):
Reinforced concrete deck
Special Item 4
Steel plates looking South in span 2
b45-006_26_xtd4.jpg
Linked Element(s):
Reinforced concrete deck
Page 54 of 63
11B-45-006 22-Apr-2026 inspection as of 27-Apr-2026
page 11 Structure No.:B-45-006
Special Item 5
Steel plates looking north with asphalt wedges.
b45-006_26_xtd5.jpg
Page 55 of 63
12B-45-006 22-Apr-2026 inspection as of 27-Apr-2026
This page intentionally left blank
Page 56 of 63
Item: 9.b.
Agenda Item Information Sheet
To: Public Works Committee
From: Jon Edgren, Public Works Director
Meeting Date: September 17, 2026
Department/Office: Highway Department
Item Name: Management/Financial/Informational Reports
Summary:
Highway Financials — Sept 2026
Recommended Action:
None
Attachments:
1. Highway Financials - Sept 2026
Page 57 of 63
Current
Month
Actual
2026
YTD
Actual
2026
Total
Budget
Budget
Balance
%
Budget
YTD
Revenues
Taxes:
205-1-01-41110-000 Property Tax 276,291.00 1,934,037. 00 3,315,492.00 1,381,455.00 58.33%
Total Taxes 276,291.00 1,934,037.00 3,315,492.00 1,381,455.00 58.33 %
Intergovernmental Revenues:
205-1-01-42330-000 St Aid - Transportation Aid 891,3 27.02 1,336,990.53 1,780,710.00 443,719.47 75.08%
Total Intergovernmental Revenues 891,327.02 1,336,990 .53 1,780,710.00 443,719.47 75.08%
Total Revenues $1,167,618.02 $3,271,027.53 $5,096,202.00 $1,825,174.4 7 64.19%
Expenditures
Interdepartment Charges:
205-1-01-55310-000 CTHS General
Maintenance 198,588.96 1,342,245.78 2,244,160.92 901,915.14 59.81%
205-1-01-55320-000 CTHS Winter Maintenance 7,239.26 7 27,307.58 1,252,030.92 524,723.34 58.09%
205-1-01-55330-000 CTHS Construction 355,687.85 743,9 75.56 1,525,020.96 781,045.40 48.78%
205-1-01-55340-000 CTHS Bridge Construction 1,290.02 4,818.88 18,990.00 14,171.12 25.38%
205-1-01-55370-000 Surveying 138.78 14,717.79 55,999.9 2 41,282.13 26.28%
Total Interdepartment Charges 562,944.87 2,833,065.59 5,096,202.72 2,263,137.13 55.59%
Total Operating Expenditures $562,944.87 $2,833,065.5 9 $5,096,202.72 $2,263,137.13 55.59%
Total Expenditures $562,944.87 $2,833,065.59 $5,096,202.72 $2,263,137.13 5 5.59%
Net Increase (Decrease) $604,673.15 $437,961.94 ($0.72 ) ($437,962.66)
-
6082804
7.22%
OZ-Curr:205-1
Ozaukee County
County Roads and Bridges
For the Seven Months Ending Friday, July 31, 2026
7/31/2026
FRPnL2026 2026 Profit and Loss Statement
Page 58 of 63
Current
Month
Actual
2026
YTD
Actual
2026
Total
Budget
Budget
Balance
%
Budget
YTD
Revenues
Intergovernmental Charges $58,769.60 $1,001,086.32 $2, 016,399.72 $1,015,313.40 49.65%
Total Revenues $58,769.60 $1,001,086.32 $2,016,399.72 $1,015,313.40 49 .65%
Expenditures
Salaries 22,657.38 330,390.80 632,999.52 302,608.72 52.19%
Supplies 4,385.47 106,982.11 335,499.36 228,517.25 31.89%
Interdepartment Charges 31,723.21 560,887.74 1,047,909 .60 487,021.86 53.52%
Other Expenses 55.00 (55.00) 0.00%
Total Operating Expenditures $58,766.06 $998,315.65 $2 ,016,408.48 $1,018,092.83 49.51%
Total Expenditures $58,766.06 $998,315.65 $2,016,408.48 $1,018,092.83 49.5 1%
Net Increase (Decrease) $3.54 $2,770.67 ($8.76) ($2,779.43)
-
31628.6
5%
OZ-Curr:601-4
Ozaukee County
HWY State Highway System
For the Seven Months Ending Friday, July 31, 2026
7/31/2026
FRPnL2026 2026 Profit and Loss Statement
Page 59 of 63
Current
Month
Actual
2026
YTD
Actual
2026
Total
Budget
Budget
Balance
%
Budget
YTD
Revenues
Intergovernmental Charges $456,325.96 $1,315,220.42 $1 ,834,914.84 $519,694.42 71.68%
Total Revenues $456,325.96 $1,315,220.42 $1,834,914.84 $519,694.42 71. 68%
Expenditures
Salaries 65,975.26 216,106.54 353,499.84 137,393.30 61.13%
Supplies 215,633.77 716,065.41 848,999.52 132,934.11 84.34%
Purchased Services 1,099.74 (1,099.74) 0.00%
Interdepartment Charges 95,355.00 344,781.32 632,414.7 6 287,633.44 54.52%
Total Operating Expenditures $376,964.03 $1,278,053.0 1 $1,834,914.12 $556,861.11 69.65%
Total Expenditures $376,964.03 $1,278,053.01 $1,834,914.12 $556,861.11 69. 65%
Net Increase (Decrease) $79,361.93 $37,167.41 $0.72 ($3 7,166.69)
5162140
.28%
OZ-Curr:601-5
Ozaukee County
HWY Local Roads Maintenance and Construction
For the Seven Months Ending Friday, July 31, 2026
7/31/2026
FRPnL2026 2026 Profit and Loss Statement
Page 60 of 63
Current
Month
Actual
2026
YTD
Actual
2026
Total
Budget
Budget
Balance
%
Budget
YTD
Revenues
Interdepartmental Charges $186,006.45 $1,555,041.91 $1 ,093,740.00 ($461,301.91) 142.18%
Total Revenues $186,006.45 $1,555,041.91 $1,093,740.00 ($461,301.91) 1 42.18%
Expenditures
Salaries 33,130.67 238,102.26 195,999.96 (42,102.30) 121.48%
Supplies 87,186.88 763,541.54 606,999.36 (156,542.18) 125.79%
Purchased Services 70.78 2,687.74 5,499.84 2,812.10 48.87%
Interdepartment Charges 69,249.99 560,501.16 285,240.0 0 (275,261.16) 196.50%
Total Operating Expenditures $189,638.32 $1,564,832.7 0 $1,093,739.16 ($471,093.54) 143.07%
Total Expenditures $189,638.32 $1,564,832.70 $1,093,739.16 ($471,093.54) 1 43.07%
Net Increase (Decrease) ($3,631.87) ($9,790.79) $0.84 $ 9,791.63
-
1165570
.24%
OZ-Curr:601-6
Ozaukee County
HWY Local Departments Non Highway
For the Seven Months Ending Friday, July 31, 2026
7/31/2026
FRPnL2026 2026 Profit and Loss Statement
Page 61 of 63
Ozaukee County Highway Department
2026 Capital Outlay
Equipment Purchases
Fleet # Description Budget 2026 Cost
Amount (Over)
Under Budget Status
65 Betterment for Tow Plow $50,000.00 $5,756.53 In Progress
89 Chevy Silverado $56,000.00 $51,873.41 In Progress
96 Ford Versalift Sign Truck $375,000.00 $93,522.47 In Progress
98 Ford F350 $69,077.76 In Progress
986 Lite Systems Message Board $14,815.58 In Progress
135 Indeco Compactor $11,748.79 ($11,748.79) Complete
189 Diamond C 12 Ton Trailer $17,500.00 $17,212.75 $287.25 Complete
335 Kubota Skid Steer $70,000.00 $68,037.43 $1,962.57 Complete
0001T Tow Plow $210,000.00 Ordered
$853,500.00 $332,044.72 ($9,498.97)
Other Capital Projects
Location Description Budget 2026 Cost
Amount (Over)
Under Budget Status
Port Corghi Tire Machine $50,000.00 $34,741.92 $15,258.08 Completed
Port Repave Yard $225,000.00 $82,695.47 $142,304.53 Completed
Waubeka Salt Dome Door $60,000.00 $36,997.00 $23,003.00 Completed
Waubeka Repave Yard $80,000.00 $2,751.99 In Progress
$415,000.00 $154,434.39 $180,565.61
$75,000.00
Page 62 of 63
Ozaukee County Highway Department
2026 Construction Report
2026 Levy Funded Highway Construction Projects
Project Type Miles Levy Budgeted Actual Budget vs Actual Budgeted Tons Actual Tons Complete
*CTH W - STH 33 to Schowalter Rd 5" Paving 0.40 $450,000.00 $ - $450,000.00 4,500
CTH K - CTH KW to Termaat Rd 2.5" Overlay; Widen to 28' 0.30 $100,000.00 $ - $100,000.00 750
CTH I - CTH Z to Fredonia-Kohler Rd Reconstruction 0.20 $60,000.00 -$ $60,000.00 450
CTH I - Hawthorne Dr to River Park Rd 2.5" Overlay 1.00 $225,000.00 -$ $225,000.00 2,500
$835,000.00 $0.00 $835,000.00 8,200 0
2024/2025 Levy Funded Highway Department Constructions Projects - Not Completed
Project Type Miles Levy Budgeted Actual Budget vs Actual Budgeted Tons Actual Tons Complete
CTH I - STH 33 to Shady Ln 2.5" Overlay 1.90 $450,000.00 $ - $450,000.00 4,800
CTH I - Lilac Ln to STH 33 2.5" Overlay; Widen to 30' 5.10 $1,100,000.00 -$ $1,100,000.00 13,000
CTH I - Shady Ln to Hawthorne Dr 2.5" Overlay 1.00 $225,000.00 -$ $225,000.00 2,500
$1,775,000.00 $0.00 $1,775,000.00 20,300 0
Split Funding Source Projects - Bid Work
Project Type
Total Project
Cost/Contract
Amt
Prior Year(s)
Cty Funds
Budgeted
2026 Cty Funds
Budgeted
Prior Year(s)
Expense
2026
Expense
Grand
Total
Under (Over)
Budget Complete
CTH W - STH 33 to Schowalter Rd Engineering $120,000.00 $60,000.00 $0.00 $146,881.76 $23,121.00 $170,002.76 ($110,002.76)
CTH W - STH 33 to Schowalter Rd ROW Acquisition $0.00 $135,375.58 $23,300.00 $158,675.58 ($158,675.58)
*CTH W - STH 33 to Schowalter Rd Construction $2,800,000.00 $300,000.00 $800,000.00 $0.00 $667,441.92 $667,441.92 $432,558.08
CTH KW - CTH H to Lake Drive Engineering $50,000.00 $0.00 $0.00 $0.00 $0.00 $50,000.00
CTH KW - CTH H to Lake Drive Pulverize/Repave $1,000,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
CTH W - CTH W (Port Rd) & CTH C (Pioneer Rd) Traffic Signals $200,000.00 $20,000.00 $0.00 $5,058.14 $7,529.36 $12,587.50 $7,412.50
CTH Y - CTH Y (Granville Rd) & CTH T (Lakefield Rd) Concrete Reconstruction $100,000.00 $0.00 $50,000.00 $0.00 $25,653.81 $25,653.81 $24,346.19
*All ongoing Projects $4,220,000.00 $430,000.00 $850,000.00 $287,315.48 $747,046.09 $1,034,361.57 $245,638.43
*CTH W - STH 33 to Schowalter Rd Construction - $550,000 budgeted in 2024 ($250,000 tax levy + $300,000 fund balance)
2026 Budget 2026 Actual Budget vs Actual
$835,000.00 0.00 $835,000.00
$850,000.00 $747,046.09 $102,953.91
$1,685,000.00 $747,046.09 $937,953.91
Levy Funded County Projects
Split Funding/Bid Work
CHI-D Funding (50/50 Split)
CHI-D Funding (50/50 Split) Const 2027
Signal Improvement
CHI Funding (50%); Engineering 2026
LRIP-S & CHI-S Funding (75%) - Const 2024
Funding
LRIP-S & CHI-S Funding (75%)
Page 63 of 63