Public Works Committee
Regular Meeting
Thursday, May 21, 2026, 8:00 AM
Highway Department — Meeting Room
410 S. Spring Street, Port Washington, WI
The public can access the meeting by viewing the live stream on the County website, Agendas & Minutes page and select the meeting agenda
date.
The public can submit comments here: Public Comment Form
Public Comment Policy & Instructions For Submitting Public Comments Online
REVISED
AGENDA
1. Call to Order
2. Proper Notice
3. Staff and Committee Introductions
4. Public Comments, Correspondence, Communications
5. Approval of Minutes
March 19, 2026
6. Facilities Management
a. Action Items
1. Fairground Tamarack Trees
2. Ascension Columbia-St. Mary’s Expo Center Audio-Visual Update
3. Fairground's Zero Turn Lawn Mower
b. Discussion Items
1. Pavilion Decorative Wall
c. Management/Financial/Informational Reports
7. Transit Services
a. Discussion Items
1. GO Riteway Amendment Request
b. Management/Financial/Informational Reports
8. Highways
a. Action Items
1. Intergovernmental Cooperation Agreement for Municipal Road and Street Services relating to the Vantage
Project
2. CTH Y Road Closure for Newburg Fireman's Parade
3. Backhoe Compactor Purchase
Page 1 of 69
2
4. CTH W Bid Award
5. Ordinance: Create Section 6.05 of the Ozaukee County Code of Ordinances - Highway Department Municipal
Contracts
6. CTH W Wetland Mitigation Credit Purchase
b. Management/Financial/Informational Reports
9. Next Meeting Date
Set Meeting Day & Time
10. Adjournment
A quorum of members of committees or the full County Board of Ozaukee County may be in attendance at this meeting for purposes related to
committee or board duties. However, no formal action will be taken by these committees or the board at this meeting.
Persons with disabilities requiring accommodation for attendance at this meeting should contact the County Clerk’s Office at 262-284-8110, twenty-
four (24) hours in advance of the meeting.
Page 2 of 69
Item:
Agenda Item Information Sheet
To: Public Works Committee
From: Lisa Henning, Chief Deputy County Clerk
Meeting Date: May 21, 2026
Department/Office: County Clerk
Item Name: March 19, 2026
Summary:
March 19, 2026 Minutes
Recommended Action:
Approve the March 19, 2026 minutes as submitted.
Attachments:
1. PW MINUTES MARCH 19 2026
Page 3 of 69
PUBLIC WORKS COMMITTEE
MEETING MINUTES
REGULAR MEETING
MARCH 19, 2026
Draft Minutes Pending Committee Approval
1. CALL TO ORDER
A meeting of the Public Works Committee was held in the Highway office meeting room.
Present Supervisor Marty Wolf, Supervisor Tom Grabow, Supervisor Tom Bichler, Supervisor
Daniel Vogel
Absent Supervisor Justin Strom (8:02 AM)
Excused None
Staff present: County Administrator Dzwinel, Human Resources Director McDonell, Public Works
Director Edgren, Project Manager/Construction Superintendent Guettel, County Clerk Kretlow and Chief
Deputy County Clerk Henning.
Others present: Scott Fischer
2. PROPER NOTICE
Chairperson Wolf called the meeting to order at 8:00 AM. The clerk noticed the meeting as required.
3. PUBLIC COMMENTS, CORRESPONDENCE, COMMUNICATIONS
There were none.
4. APPROVAL OF MINUTES
February 19, 2026
Motion: Motion to approve the February 19, 2026 minutes as submitted.
Result: Passed
Moved by: Tom Grabow
Seconded by: Daniel Vogel
Ayes: Marty Wolf, Tom Grabow, Tom Bichler, Daniel Vogel
Nays: None
Abstain: None
Page 4 of 69
8:02 AM Supervisor Strom in attendance.
5. FACILITIES MANAGEMENT
a. Action Items
1. Resolution: Permanent Easement Granted to We Energies on Parcel Number 16-032-10-
004.00
Discussion regarding the request for compensation.
Motion: Motion to approve the resolution granting a permanent easement to We
Energies at Parcel Number 16-032-10-004.00 in the City of Port Washington to
facilitate electrical service and to request compensation of $1,000. This
resolution will move forward to the County Board for final action.
Result: Passed
Moved by: Tom Bichler
Seconded by: Tom Grabow
Ayes: Marty Wolf, Tom Grabow, Justin Strom, Tom Bichler
Nays: Daniel Vogel
Abstain: None
b. Management/Financial/Informational Reports
1. Facilities Financials - March 2026
There were no questions.
6. TRANSIT SERVICES
a. Management/Financial/Informational Reports
1. Transit Ridership - March 2026
Ridership is up 9% compared to February 2025. Update on staffing and discussion on capacity.
2. Transit Financials - March 2026
There were no questions.
7. HIGHWAYS
a. Action Items
1. City of Mequon's CTH W Streetscape Project Bid Award
Motion: Motion to award the CTH W (Port Washington Road) Streetscape Project to Wil-
Surge Electric, Inc. for the not to exceed amount of $2,650,800.
Result: Passed
Moved by: Justin Strom
Seconded by: Tom Grabow
Ayes: Marty Wolf, Tom Grabow, Justin Strom, Tom Bichler, Daniel Vogel
Nays: None
Abstain: None
2. 2026 Asphalt Oil Bid Award
Page 5 of 69
Mr. Edgren distributed copies of the 2026 Asphalt Oil Bid analysis and prices.
Motion: Motion to award the 2026 Asphalt Oil bid to HG Meigs Paving Asphalts &
Emulsions.
Result: Passed
Moved by: Tom Grabow
Seconded by: Tom Bichler
Ayes: Marty Wolf, Tom Grabow, Justin Strom, Tom Bichler, Daniel Vogel
Nays: None
Abstain: None
3. 2026 Hot Mix & Gravel Prices
Mr. Edgren distributed 2026 Hot Mix and Gravel cost and price analysis.
Staff is recommending, based on the data, that the prices be set as follows:
Hot Mix Asphalt: $63.00 per ton
Gravel: $9.50 per ton
Discussion on current market value and conditions, how much product is used by the County
versus other entities, and the recommended increase and effect on the budget.
Further discussion on Chairperson Wolf's suggestion to increase the price for asphalt from $60
to $65 per ton and whether prices can reviewed if the County's cost changes during the year.
Motion: Motion to approve setting the price at $63.00 per ton for Asphalt Hot Mix and
$9.50 per ton for gravel.
Result: Passed
Moved by: Tom Bichler
Seconded by: Daniel Vogel
Ayes: Tom Grabow, Justin Strom, Tom Bichler, Daniel Vogel
Nays: Marty Wolf
Abstain: None
4. CTH W Plat & Relocation Order
Mr. Edgren reviewed the revised plat and relocation order.
Motion: Motion to approve the Plat and Relocation Order for CTH W as presented.
Result: Passed
Moved by: Daniel Vogel
Seconded by: Tom Grabow
Ayes: Marty Wolf, Tom Grabow, Justin Strom, Tom Bichler, Daniel Vogel
Nays: None
Abstain: None
5. CTH W & CTH C Plat & Relocation Order
Mr. Edgren reviewed the revised plat and relocation order.
Page 6 of 69
Motion: Motion to approve the Plat and Relocation Order for CTH W & CTH C as
presented.
Result: Passed
Moved by: Tom Bichler
Seconded by: Tom Grabow
Ayes: Marty Wolf, Tom Grabow, Justin Strom, Tom Bichler, Daniel Vogel
Nays: None
Abstain: None
6. CTH W & CTH C Real Estate Acquisition Firm Award
Mr. Edgren distributed a bid analysis of the proposals.
Motion: Motion to authorize the Public Works Director to contract with Southern
Wisconsin Appraisal as the Real Estate Acquisition Firm for the CTH W & CTH C
project for $19,750.
Result: Passed
Moved by: Tom Grabow
Seconded by: Tom Bichler
Ayes: Marty Wolf, Tom Grabow, Justin Strom, Tom Bichler, Daniel Vogel
Nays: None
Abstain: None
7. 2026/2027 Bridge Inspection Agreement
Motion: Motion to authorize the Public Works Director to approve the Professional
Services Agreement with CORRE for 2026/2027 bridge inspections.
Result: Passed
Moved by: Tom Grabow
Seconded by: Daniel Vogel
Ayes: Marty Wolf, Tom Grabow, Justin Strom, Tom Bichler, Daniel Vogel
Nays: None
Abstain: None
8. Safe Streets for All Agreement
Motion: Motion to authorize the Public Works Director to approve the U.S. Department
of Transportation Grant Agreement Under the Fiscal Year 2025 Safe Street and
Roads For All Grant Program.
Result: Passed
Moved by: Tom Grabow
Seconded by: Marty Wolf
Ayes: Marty Wolf, Tom Grabow, Justin Strom, Tom Bichler, Daniel Vogel
Nays: None
Abstain: None
b. Management/Financial/Informational Reports
1. Highway Financials - March 2026
Questions on priority of construction projects.
Page 7 of 69
8. NEXT MEETING DATE
May 21, 2026 (New Committee)
Supervisor Wolf expressed gratitude to the committee members and staff, saying that working with staff
members and serving on the committee has been an honor.
9. ADJOURNMENT
Motion made by Supervisor Wolf, seconded by Supervisor Vogel to adjourn. Motion carried. Meeting
adjourned at 8:55 AM.
Lisa M. Henning, Chief Deputy County Clerk
Page 8 of 69
Item: 6.a.1.
Agenda Item Information Sheet
To: Public Works Committee
From: Jon Edgren, Public Works Director
Meeting Date: May 21, 2026
Department/Office: Facilities
Item Name: Fairground Tamarack Trees
Summary:
BACKGROUND INFORMATION:
Jeremy Dandy, N89 W6343 Willowbrooke Drive, lives on the east side of the Ozaukee County
Fairgrounds. (See attached location map.) On County property, abutting the west side of his
property, there are over 10 Tamarack Trees, each of which are at least 30’ tall.
Given the amount of needles that the trees shed, in 2017 Mr. Dandy requested that Ozaukee
County remove the trees. The Public Works Committee (PWC) at the time declined to pay for
tree removal based upon a lack of “public benefit” and the desire to maintain vegetation within
the Fairgrounds property.
Over the last few years, Ozaukee County has cleaned up the area by removing dead trees, and
cleaning up underbrush. However, we continued to see no “public benefit” to remove the trees,
and see positive benefits from the vegetation on the Fairgrounds property as natural areas and
vision blocks.
In November, following the heavy rains last summer, Mr. Dandy again requested for Ozaukee
County to remove the trees and brought additional photos (attached). Staff was directed to
review potential costs and report back to the PWC.
ANALYSIS:
Cedarburg Foreman Charlie Schlessinger investigated the site, and estimated about $4,000 for
County staff to remove 10-15 Tamarack Trees, and Mr. Dandy received a private quote for
$8,000 for removal of 16 Tamarack Trees.
Additionally, Mr. Dandy has stated that he doesn’t believe that he should be responsible for any
of the tree removal costs as they’re not his trees, but that he’d be willing to plant 3 to 5 Arbor
Vitae-type evergreen trees per year for a few years if a visual screen is desired.
Public Works Director Edgren understands the desire to be a good neighbor, but still doesn’t see
a public benefit or legal requirement for removal of the Tamarack Trees. Therefore, the PWC has
a series of questions to answer:
1) Should Ozaukee County remove or allow for removal of the Tamarack Trees?
Page 9 of 69
2) If Yes, should Ozaukee County or Mr. Dandy pay for their removal, or should it be a
shared cost?
Recommended Action:
Following discussion of the situation and potential options, the PWC should direct the Public
Works Director to act as desired.
Attachments:
1. Tamarack Tree Items
Page 10 of 69
Fairground Tamarack Trees - N89W6343 Willowbrooke Drive
Ozaukee County
Parcels
Tax Parcel
Control Survey Diagram
11/12/2025, 10:43:19 AM
0 0.01 0.020.01 mi
0 0.02 0.040.01 km
1:747
Jeremy &
Courtney
Dandy
Ozaukee
County
Fairgrounds
Page 11 of 69
Page 12 of 69
Page 13 of 69
Page 14 of 69
Item: 6.a.2.
Agenda Item Information Sheet
To: Public Works Committee
From: Jon Edgren, Public Works Director
Meeting Date: May 21, 2026
Department/Office: Facilities
Item Name: Ascension Columbia-St. Mary’s Expo Center Audio-Visual Update
Summary:
BACKGROUND INFORMATION:
The Ascension Columbia-St. Mary’s Expo Center’s (ACSMEC) (also known as the Curler’s
Building) audio visual system was installed as part of the original build around 2013. It was a
very basic system with limited functions, but has been added to over the years to make the
system work with current technology and meet renter’s growing requirements.
Facilities has averaged $4,500 per year over the last four years to keep the system operational
with patches and different components, but this spring the main amplifier failed and is no longer
repairable.
Therefore, Building Superintendent Ryan Tackes looked into replacement of the current system,
and requested Horizon Integrations submit a proposal to upgrade the system. Horizon
Integrations has performed several large technology additions for the Administration Center,
Sheriff’s Department, Clerk of Courts and Fairgrounds, and staff would prefer to maintain a
consistent provider for these services.
The system is regularly used for both County Rental events and the Milwaukee Curling Club
(MCC), so the costs will be split between the County and MCC.
ANALYSIS:
Ryan Tackes received the quote from Horizon Integration (attached) for an entirely new system
with up to date technology, required wiring and user-friendly system with a total cost of
$43,038.74. Given the split with the MCC, each would be responsible for $21,519.37.
Recommended Action:
Approve Horizon Integration’s A/V Update proposal for $44,000.
Attachments:
1. CSMEC - AV System Refresh Quote - 5-11-26
Page 15 of 69
System Refresh | 2026
A PROPOSAL FOR
Ozaukee County Curling Shed
Ryan Tackes
rtackes@ozaukeecounty.gov
W67N890 Washington Avenue
Cedarburg, WI 53012
Horizon Integrations
www.horizonintegrations.com
(262) 260-8766
1009 W. Glen Oaks Lane
Suite 112
Mequon, WI 53092
PREPARED BY CODY ALVEY • EXPIRES JUNE 05, 2026
Page 16 of 69
About Us
At Horizon Integrations, we're dedicated to enhancing every aspect of your home and lifestyle. From security cameras to conference rooms,
home theaters, outdoor audio and lighting, as well as home automation and smart home solutions, we offer a comprehensive range of services
to meet all your needs.
When it comes to security, our cutting-edge camera systems provide peace of mind, allowing you to monitor your property from anywhere, at
any time. For your professional needs, our conference room solutions are designed to facilitate seamless communication and collaboration.
But it's in the realm of entertainment where we truly shine. Our custom home theaters are tailored to your unique preferences, delivering an
unparalleled audio-visual experience that transports you to another world. Whether you're enjoying a blockbuster movie or cheering on your
favorite sports team, our theaters are designed to immerse you in the action like never before.
And when it's time to take the party outside, our outdoor audio and lighting solutions create the perfect ambiance for entertaining al fresco.
With our state-of-the-art technology, you can enjoy your favorite music and movies under the stars, all while basking in the glow of expertly
designed lighting.
But we don't stop there. Our home automation and smart home solutions bring convenience and efficiency to every aspect of your daily life.
From controlling your lighting and HVAC systems to managing your security cameras and entertainment devices, our integrated solutions put
you in control of your home like never before.
At Horizon Integrations, we're not just in the business of technology — we're in the business of enhancing your life. Experience the difference
that our comprehensive range of services can make in transforming your home into the ultimate haven of comfort, convenience, and
entertainment.
Proposal #510 02 of 10About Us
Page 17 of 69
Rack Area
Control4
Binary
Wirepath
iPort
Sonance
Apple
iPort
ICE Cable
Areas & Items
Items Sell Price Qty Total
Model: Core 5 | Main Controller
x1 $2,931.97
Combined Price
$1,018.43 Discount
Model: B6|HDMI Cables|2M (6.5 ft)
x1
Model: Slim Cable | Cat6 | 5ft
x1
Connect PRO Case for Air Pro 11 (Black)
x1 $1,480.65
Combined Price
$22.34 Discount
Model: CONNECT PRO|WallStation|Black
x1
Model: Ipad Air|Size 11"
x1
Model: 72012|CONNECT POE+|Network Adapter
x1
Cat6|Internet Wire|White
x40
Proposal #510 03 of 10Rack Area
Page 18 of 69
Strong
Strong
Strong
Strong
Control4
Wirepath
Ubiquiti
AVPro Edge
AVPro Edge
Wirepath
Items Sell Price Qty Total
Model: FS Series|Rack System|Fans Included|21U|24in Depth
x1 $1,532.94
Combined Price
$147.00 Discount
Rack Lacing Bar|2" Offset| 5 Pack
x1
Fixed Rack Shelf|Half Depth|1U
x3
Lockable Rack Drawer|2U
x1
Model: C4-IOXV2|IO- Extender
x1 $805.99
Combined Price
$57.42 Discount
Model: Slim Cable | Cat6 | 5ft
x1
Pro Switch|Gigabit|24-Port
$350.00
reg $400.00
x1 $350.00
$50.00 Discount
HDMI Matrix | HDBT | 4K60 4:4:4 | 8/16 Zones
x1 $10,941.85
Combined Price
$5,975.48 Discount
HDBT Receiver | 4K60 4:4:4
x5
Model: Slim Cable | Cat6 | 5ft
x1
Proposal #510 04 of 10Rack Area
Page 19 of 69
Binary
Ubiquiti
Ubiquiti
Ubiquiti
Episode
Binary
Binary
Wirepath
Episode
Wirepath
Items Sell Price Qty Total
Model: BX Series|8K HDMI|2 Meter
x9
Patch Panel|Rack Mount|24-Port
x1 $329.97
Combined Price
Keystone Coupler|Cat 6|12-Pack
x2
Patch Cable|0.15 m|24-pack
x1
Episode EA-COM-DSP-16-8 Business Music 16x8 Digital Signal Processor
x1 $2,125.91
Combined Price
$399.43 Discount
Model: B3 Series|Analog Audio|1 Meter
x5
Model: B3|Analog Audio|3.5mm|2 Meter
x3
Model: Slim Cable | Cat6 | 5ft
x1
Hybrid DSP Audio Amplifier
x2 $3,411.98
Combined Price
$800.84 Discount
Model: Slim Cable | Cat6 | 5ft
x2
Proposal #510 05 of 10Rack Area
Page 20 of 69
Autonomic
Binary
Wirepath
Shure
Binary
Shure
Binary
Wirepath
Samsung
Shure
Items Sell Price Qty Total
Mirage Music Streamer
x1 $821.93
Combined Price
$0.43 Discount
Model: B3 Series|Analog Audio|1 Meter
x1
Model: Slim Cable | Cat6 | 5ft
x1
Rack Mount Wireless Vocal System (SM58)
x1 $836.97
Combined Price
$78.01 Discount
XLR Cable|Gold Plated|2 ft (.6m)
x2
Handheld Wireless Microphone with Dynamic Capsule
x1
4K Media Over IP Controller
x1 $506.98
Combined Price
$162.43 Discount
Model: Slim Cable | Cat6 | 5ft
x1
75" Crystal UHD DU8000 Series TV
Meeting Room
$950.00 x1 $950.00
100' #14/3 Round Bilge Pump Cable
x2 $1,827.86
Combined Price
$820.04 Discount
Proposal #510 06 of 10Rack Area
Page 21 of 69
Shure
Shure
Hosa Technology
AVPro Edge
ICE Cable
Binary
AVPro Edge
Binary
Wirepath
Items Sell Price Qty Total
100' UHF Antenna Extension Cable
x2
In-Line Power Adapter for Audio Equipment
x2
6 ft 50-Ohm Coaxial BNC Cable
x2
HDMI Basic Wall Plate Kit|4K|HDBaseT
$749.00
reg $1,009.00
x1 $749.00
$260.00 Discount
Cat6|Internet Wire|White
$0.42
reg $0.70
x60 $25.20
$16.80 Discount
Model: BX Series|8K HDMI|2 Meter
$34.99
reg $45.99
x2 $69.98
$22.00 Discount
Model: AC-MAX-24 | 24 Zone | Audio Matrix
10 Year Warranty
x1 $2,845.83
Combined Price
$418.43 Discount
Model: B3 Series|Analog Audio|1 Meter
x16
Model: Slim Cable | Cat6 | 5ft
x1
Rack Area Total : $32,545.01
Proposal #510 07 of 10Rack Area
Page 22 of 69
Labor | Misc Parts
Miscellaneous
Supplies
Labor Labor Rate
Items Sell Price Qty Total
Fittings|Connectors|Screws|Wall Plates|Zip ties|Velcro|etc.
$250.00 x1 $250.00
Fixed|Any adjustments will require a change order
$8,000.00 x1 $8,000.00
Labor | Misc Parts Total : $8,250.00
Proposal #510 08 of 10Labor | Misc Parts
Page 23 of 69
You received $10,249.08 in line item discounts on this
proposal.
You received an additional in discounts on parts.
Total Parts $32,795.01
Total Labor $8,000.00
Subtotal $40,795.01
Sales Tax $2,243.73
Parts: 5.5% Labor: 5.5%
Proposal Total $43,038.74
Financial Summary
Proposal #510 09 of 10Financial Summary
Page 24 of 69
Payment Schedule
PAYMENT SCHEDULE
Payment 1 60% of Proposal Total • Due Upon Proposal Acceptance $25,823.24
Payment 2 Outstanding Proposal Balance • Due Upon Job Completion $17,215.50
Project Terms
This Proposal, herein referred to as the 'Agreement,' shall remain valid for a duration of 14 days from the date of issuance.
Upon either party's signature or the receipt of a deposit, this Proposal shall be deemed as an official Contract, legally
binding and enforceable.
It is important to note that all proposals are subject to time and material billing, which may apply in cases where labor
amounts exceed initial estimates. Additionally, should the need arise for additional parts or services not initially outlined
in this Agreement, the total amount exceeding $500 shall require the issuance and mutual signing of a Change Order by
the client.
In the event of a return, not attributed to product defect, a Restocking Fee of 15% shall be levied on any contracted item.
At Horizon Integrations, we take pride in our workmanship and installation standards, offering a 30-day warranty on all
installs. We require the use of surge protectors and/or any cables recommended by Horizon Integrations to ensure this
warranty. Additionally, we provide assistance in facilitating any manufacturer warranty claims at our standard hourly rate.
Should any product purchased from us malfunction within the warranty period, customers are responsible for the cost of
removal and reinstallation to honor the manufacturer's warranty.
For continuous assurance beyond the initial warranty period, we extend service and maintenance agreements tailored to
safeguard your system. Further elaboration on these agreements can be provided upon request.
Proposal #510 10 of 10Payments
Page 25 of 69
Item: 6.a.3.
Agenda Item Information Sheet
To: Public Works Committee
From: Jon Edgren, Public Works Director
Meeting Date: May 21, 2026
Department/Office: Facilities
Item Name: Fairground's Zero Turn Lawn Mower
Summary:
BACKGROUND INFORMATION:
The Fairgrounds currently has a 2017 Kubota Compact Tractor and a 1995 Simplicity Lawn
Mower for mowing roughly 5-acres of lawn.
The Kubota Compact Tractor was purchased to become the main lawn mowing equipment, and
has been able to perform multiple other duties at the Fairgrounds. However, over the years, it has
started being used for other work more as the number of horse shows has nearly doubled during
the summer.
As the Kubota Compact Tractor has been tied up, Fairground’s staff have attempted to keep up
with mowing on the Simplicity Lawn Mower, but it is worn out and not a reliable option. That
has led Facilities staff to transport the Justice Center’s Zero Turn Lawn Mower to the
Fairgrounds from time-to-time, which is time consuming and takes staff from other duties.
Therefore, Facilities staff sought quotes for a new lawn mower to become the primary cutting
equipment.
ANALYSIS:
Ryan Tackes, Justice Center’s Building Superintendent, requested quotes from three (3)
Suppliers, and received the following quotes (full quotes attached):
Grasshopper 325D Gibbsville Implement $16,700
John Deere Z994R Mid-State Equipment $17,940.03
*Kubota ZD1211 Lochen Equipment $19,342.72
Grasshopper 725DT Gibbsville Implement $19,500
*Recommendation by Facility Staff
Based upon the quotes received and discussion with staff, Facility staff recommends the Kubota
ZD1211 from Lochens Equipment. It has easy maintenance with an onboard jack system, the
Justice Center has used a similar Kubota for 12 years and over 1,000 hours of use, and the
servicing dealer is in Newburg.
Page 26 of 69
Recommended Action:
Approve the purchase of the Kubota ZD1211 from Lochen Equipment for up to $20,000.
Attachments:
1. Fairgrounds Zero Turn Mower Quotes
Page 27 of 69
Page 28 of 69
Salesperson : X ___________________ Accepted By : X ___________________
ALL PURCHASE ORDERS MUST BE MADE OUT TO
(VENDOR):
Deere & Company
2000 John Deere Run
Cary, NC 27513-2789 US
FED ID: 36-2382580
UEID: FNSWEDARMK53
ALL PURCHASE ORDERS MUST BE SENT TO DELIVERING
DEALER:
Nolan Yonkman
Mid-State Equipment Jackson
3660 Scenic Road Jackson, WI 53037
Prepared For
COUNTY OF OZAUKEE OZAUKEE
COUNTY JAIL
1201 S SPRING ST
PORT WASHINGTON, WI 530742491
Prepared By
Nolan Yonkman
Mid-State Equipment Jackson
3660 Scenic Road
Jackson, WI 53037
262-677-8400-1224
nyonkman@midstateequipment.com
Quote Id 2008100
Creation Date 29-Apr-2026
Expiration Date 29-May-2026
Quote Summary
Equipment Summary Suggested List Selling Price QTY In Group Extended
Z994R Diesel Commercial ZTrak $23,039.00 $17,740.03 1 $17,740.03
Contract: WI VA NASPO 505ENT-O25-GROUNDMAINT-02 (PG W1 CG 22)
Price Effective Date: 28-Apr-2026
Rim Guard Rear Ballast ZTRAK MOWERS / Open
Market $200.00 $200.00 1 $200.00
Contract: Open Market
Equipment Total $17,940.03
Quote Summary
Total Selling Price $17,940.03
Sub-total $17,940.03
Balance Due $17,940.03
Page 29 of 69
Page 30 of 69
Page 31 of 69
Item: 6.b.1.
Agenda Item Information Sheet
To: Public Works Committee
From: Jon Edgren, Public Works Director
Meeting Date: May 21, 2026
Department/Office: Facilities
Item Name: Pavilion Decorative Wall
Summary:
Recommended Action:
BACKGROUND INFORMATION:
The Fairground’s Pavilion was originally constructed in the 1990’s, and expanded in 2013,
including an architectural stone wall. (See attached photos.)
In 2023, as part of a roof replacement on the Fairgrounds Pavilion, the roofing contractor made
us aware of several cracks and missing brick on the decorative wall. Building Superintendent
Ryan Tackes brought in Masonry Restoration to review the situation, and they believe that the
brick work used isn’t ideal for exterior conditions. Regardless, they performed repairs to add
missing stones, add flashing and repair the cracks, which stopped the leaks for the last two years.
However, the leaks have returned, and Superintendent Tackes is looking at longer term solutions
given roughly $5,000 spent in decorative wall repairs to date.
ANALYSIS:
Superintendent Tackes is exploring two potential options:
1. Replace the stone with siding
The stone would be removed, and replaced with siding either to match the existing siding
or a stand alone accent wall color.
2. Replace the stone with brick work meant for exterior use
The stone would be removed, and reconstructed. We do not have cost estimates for the
potential replacement, but would assume at least $20,000.
If nothing is done, we anticipate up to $2,000 in repairs annually, and additional future work due
to continued damage to the underlying structure.
Staff is looking for input from the Public Works Committee on the desire to maintain the stone
façade wall versus replacing it with a more maintenance friendly design.
Page 32 of 69
Attachments:
1. Oz Pavilion - Decorative Wall
Page 33 of 69
Page 34 of 69
Page 35 of 69
Item: 6.c.
Agenda Item Information Sheet
To: Public Works Committee
From: Jon Edgren, Public Works Director
Meeting Date: May 21, 2026
Department/Office: Facilities
Item Name: Management/Financial/Informational Reports
Summary:
Facilities Financials & Ridership Report - May 2025
Recommended Action:
None
Attachments:
1. Facilities Financials - May 2026
Page 36 of 69
Current
Month
Actual
2026
YTD
Actual
2026
Amended
Budget
Budget
Balance
%
Budget
YTD
Revenues
Interdepartmental Charges $6,253 $25,010 $76,530 $51,52 0 32.68%
Other Revenue - $700 - ($700) 0.00%
Total Revenues $6,253 $25,710 $76,530 $50,820 33.59%
Expenditures
Salaries $57,780 $223,592 $810,348 $586,756 27.59%
Fringe Benefits $20,581 $95,286 $261,830 $166,544 36.39%
Travel/Training - - $100 $100 0.00%
Supplies $7,321 $38,969 $123,132 $84,163 31.65%
Purchased Services $24,875 $138,440 $440,349 $301,909 31 .44%
Interdepartment Charges $2,579 $26,611 $58,576 $31,965 4 5.43%
Other Expenses - - $2,270 $2,270 0.00%
Total Operating Expenditures $113,136 $522,898 $1,696, 605 $1,173,707 30.82%
Capital Outlay
Total Expenditures $113,136 $522,898 $1,696,605 $1,173, 707 30.82%
Net Increase (Decrease) ($106,883) ($497,188) ($1,620, 075) ($1,122,887) 30.69%
E q u i t y:
Ozaukee County Committee Report
General Fund Facilities Management
For the Four Months Ending Thursday, April 30, 2026
Profit and Loss Statement ACTUAL TO AMENDED BUDGET
CommRpt2026 2026 Oversight Comm Recommended PnL Amen ded Bdgt 5/13/2026
Page 37 of 69
Current
Month
Actual
2026
YTD
Actual
2026
Amended
Budget
Budget
Balance
%
Budget
YTD
Revenues
Taxes $9,566 $38,264 $114,791 $76,527 33.33%
Public Charges for Services $4,200 $15,175 $244,378 $22 9,203 6.21%
Interest Revenue - - $10,000 $10,000 0.00%
Other Revenue - - $3,000 $3,000 0.00%
Total Revenues $13,766 $53,439 $372,169 $318,730 14.36%
Expenditures
Salaries $7,923 $31,753 $99,909 $68,156 31.78%
Fringe Benefits $3,659 $17,336 $45,202 $27,866 38.35%
Travel/Training - - $501 $501 0.00%
Supplies $1,184 $15,986 $24,677 $8,691 64.78%
Purchased Services $7,912 $76,047 $183,804 $107,757 41.3 7%
Interdepartment Charges $327 $4,894 $11,824 $6,930 41.39 %
Other Expenses - $3,359 $6,251 $2,892 53.74%
Total Operating Expenditures $21,005 $149,375 $372,168 $222,793 40.14%
Capital Outlay
Total Expenditures $21,005 $149,375 $372,168 $222,793 40 .14%
Net Increase (Decrease) ($7,239) ($95,936) $1 $95,937
-
9593600
.00%
E q u i t y:
Ozaukee County Committee Report
Special Revenue Fund Fair Grounds
For the Four Months Ending Thursday, April 30, 2026
Profit and Loss Statement ACTUAL TO AMENDED BUDGET
CommRpt2026 2026 Oversight Comm Recommended PnL Amen ded Bdgt 5/13/2026
Page 38 of 69
Item: 7.a.1.
Agenda Item Information Sheet
To: Public Works Committee
From: Jon Edgren, Public Works Director
Meeting Date: May 21, 2026
Department/Office: Transit
Item Name: GO Riteway Amendment Request
Summary:
BACKGROUND INFORMATION:
GO Riteway has been operating as the Ozaukee County Transit Service’s (OCTS) Shared Ride Taxi (SRT)
contractor since 2023 with 58,800 service hours in the agreement.
Over the last few years, SRT has seen an 18% increase in ridership, but has been able to maintain the service hours
with efficiencies recognized through Ecolane software and improved knowledge by GO Riteway.
However, GO Riteway has begun to go over the estimated service hours, and has requested an amendment for up to
an additional 9,600 hours (+/-$360,000) to maintain the current service as-is.
ANALYSIS:
The current SRT contract is for 58,800 service hours at $36.84/Hour for a total cost of $2,166,192. That cost is paid
via Transit Grants, Farebox Revenue and Tax Levy.
Transit Superintendent Kerise Zutz has begun to review GO Riteway’s proposed amendment, and has ideas where
potential changes could be made in the Hours of Operation and/or allotment of service hours.
Additionally, as we’ve been in process of shifting from Urban to Rural funding sources over the last year, we’re still
trying to determine the exact reimbursement rates to expect. However, Transit Superintendent Zutz is scheduled to
meet with Wisconsin Department of Transportation (WisDOT) Transit officials in the near future.
We anticipate updating the Public Works Committee on some of the findings, and take questions before bringing
back any recommendations in June.
Recommended Action:
None
Attachments:
None
Page 39 of 69
Item: 7.b.
Agenda Item Information Sheet
To: Public Works Committee
From: Jon Edgren, Public Works Director
Meeting Date: May 21, 2026
Department/Office: Transit
Item Name: Management/Financial/Informational Reports
Summary:
Transit Financials
Recommended Action:
None
Attachments:
1. Ridership - May 2026
2. Transit Financials - May 2026
Page 40 of 69
Page 41 of 69
Current
Month
Actual
2026
YTD
Actual
2026
Amended
Budget
Budget
Balance
%
Budget
YTD
Revenues
Taxes $20,736 $82,943 $248,829 $165,886 33.33%
Intergovernmental Revenues - $252,806 $2,086,733 $1,833 ,927 12.11%
Public Charges for Services $36,758 $248,667 $562,250 $ 313,583 44.23%
Interest Revenue $147 $593 - ($593) 0.00%
Other Revenue - - $335,787 $335,787 0.00%
Total Revenues $57,641 $585,009 $3,233,599 $2,648,590 18 .09%
Expenditures
Salaries $3,471 $16,651 $150,157 $133,506 11.09%
Fringe Benefits $1,721 $9,639 $48,620 $38,981 19.83%
Travel/Training - - $4,503 $4,503 0.00%
Supplies $121 $62,844 $278,814 $215,970 22.54%
Purchased Services $1,862 $608,416 $2,343,050 $1,734,63 4 25.97%
Interdepartment Charges $2,211 $45,406 $154,602 $109,19 6 29.37%
Other Expenses - - $40,602 $40,602 0.00%
Total Operating Expenditures $9,386 $742,956 $3,020,34 8 $2,277,392 24.60%
Capital Outlay
Equipment & Furniture - - $213,251 $213,251 0.00%
Total Capital Outlay - - $213,251 $213,251 0.00%
Total Expenditures $9,386 $742,956 $3,233,599 $2,490,64 3 22.98%
Net Increase (Decrease) $48,255 ($157,947) - $157,947 0. 00%
E q u i t y:
Ozaukee County Committee Report
Special Revenue Fund Transit Services
For the Four Months Ending Thursday, April 30, 2026
Profit and Loss Statement ACTUAL TO AMENDED BUDGET
CommRpt2026 2026 Oversight Comm Recommended PnL Amen ded Bdgt 5/13/2026
Page 42 of 69
Item: 8.a.1.
Agenda Item Information Sheet
To: Public Works Committee
From: Jon Edgren, Public Works Director
Meeting Date: May 21, 2026
Department/Office: Highway Department
Item Name: Intergovernmental Cooperation Agreement for Municipal Road and Street Services relating to the
Vantage Project
Summary:
BACKGROUND INFORMATION:
Last September, Ozaukee County and the City of Port Washington entered into an agreement to
have Ozaukee County pave CTH LL following the City’s installation of sanitary sewer and
watermain in the highway.
As activity continues to increase around the Vantage Data Center, Ozaukee County has seen an
increase in required maintenance, and has worked with the City of Port Washington to include
those repairs as part of the Developer’s Agreement between the City and Vantage Data Center.
Following discussions with the Wisconsin County’s Association (WCA) legal counsel Andy
Phillips, it was recommended that we create an agreement specifically allowing Ozaukee County
to perform the repairs and bill Vantage Data Center directly.
ANALYSIS:
Attached is the proposed agreement developed by Attorney Phillips.
Recommended Action:
Approve the City of Port Washington Intergovernmental Cooperation Agreement for Municipal
Road and Street Services relating to the Vantage Project.
Attachments:
1. Intergovernmental Cooperation Agreement for Municipal Road and Street Services - 5-14-26
Page 43 of 69
61530612
INTERGOVERNMENTAL COOPERATION AGREEMENT FOR MUNICIPAL ROAD
AND STREET SERVICES RELATING TO V ANTAGE PROJECT
This INTERGOVERNMENTAL COOPERATION AGREEMENT FOR MUNICIPAL
ROAD AND STREET SERVICES RELATING TO V ANTAGE PROJECT (“Agreement”) is
entered into as of April 1, 2026 (the “Effective Date”), by and between OZAUKEE COUNTY , a
county organized under the laws of the State of Wisconsin (the “County”), and the CITY OF PORT
WASHINGTON, a city organized under the laws of the State of Wisconsin (the “City”) pursuant
to applicable law including, without limitation, Wis. Stats. §§ 66.0301, 83.035 and 86.02. Each of
the entities shall be referred to as a “Party” and collectively the “Parties.”
EXPLANATORY STATEMENT
A. Applicable law authorizes the County and the City to enter into this Agreement for
purposes of repairing and maintaining streets and highways; and
B. Vantage Data Centers Lighthouse Campus has begun constructing a data center
within the City of Port Washington limits (the “Project”). As a result of the Project,
certain development and construction activities will take place in the Town and City
of Port Washington, including the transportation of heavy construction materials
via City, Town, and County roads and highways; and
C. Transportation of these heavy construction materials has resulted or may result in
damage to Town of Port Washington roads, City streets and County highways; and
D. The County and the City desire to allocate by mutual agreement the authority and
responsibility of repair to Town roads, City streets and County highways that have
become or may become damaged as a result of the Project; and
E. Vantage Data Centers Management Company, LLC (“Vantage” or “Developer”) is
financially responsible for the costs to repair any damage to City, Town or County
roads to the extent caused by construction activities relating to the Project pursuant
to that certain Development Agreement entered into as of August 19, 2025 by and
between the City and Vantage (“Development Agreement”); and
F. The Parties desire to set out their respective understandings with respect to the
reimbursement arrangement set forth in this Agreement.
NOW, THEREFORE, in consideration of the mutual terms and conditions contained herein, the
Parties, intending to be legally bound, agree as follows:
Page 44 of 69
2
61530612
ARTICLE I
SERVICES
1.01 Definition. The term “Services” to be provided by the County to the City hereunder are the
repair of asphalt and pavement of the streets and roads within the Town of Port Washington
and City and the repair of asphalt and pavement of County highways to the extent caused
by Vantage’s construction activities relating to the Project.
1.02 Services. In regard to Services to repair County highways, the Parties agree as follows:
1. County shall be responsible for providing the labor and equipment required for Services
to rehabilitate and repair streets and roads within the Town of Port Washington and City
and the repair of asphalt and pavement of County highways.
2. The County shall be responsible for the construction, implementation and oversight of
any and all Services undertaken pursuant to this Agreement. This includes overseeing
all aspects of the Services. The County will ensure that the necessary resources,
personnel, and equipment are allocated efficiently to complete the repair in a timely
and effective manner. Additionally, the County is responsible for all associated
administrative tasks, including permits and compliance with applicable laws and
regulations.
3. This Agreement shall not, and is not intended to, modify the statutory responsibility of
the County, the City or any other unit of government for the roads, streets and highways
within its jurisdiction and the termination of this Agreement shall relieve the County of
any further obligation of maintaining these roads, streets and highways.
ARTICLE II
PAYMENT
2.01 Payment. Section II(C)(2)e of the Development Agreement provides:
Road Repairs. Upon completion of development on each of the South Phase and
the North Phase, the Developer, at its cost, shall repair damage to any City, Town
or Ozaukee County roads, if, in the City’s reasonable discretion, such damage was
caused by Developer’s construction activities relating to the Project. In addition,
Developer shall, during Project construction, repair any damage caused by
Developer’s construction activities which renders City, Town or Ozaukee County
roads impassable by the traveling public.
By acknowledging this Agreement below, Vantage hereby acknowledges its obligation to
pay for the County’s provision of the Services consistent with the Development Agreement.
The County shall invoice Vantage for all such Services on a monthly basis and Vantage
shall remit payment as soon as practicable and without delay. The City shall reasonably
cooperate with the County to ensure the County is paid for its provision of Services.
Page 45 of 69
3
61530612
ARTICLE III
TERM AND TERMINATION
3.01 Term. Unless terminated as provided herein, the term of this Agreement will commence on
the date of execution by the last party to sign the Agreement (hereinafter, the “Effective
Date”). The term shall be from the Effective Date until the expiration of the Developer’s
obligations in accordance with the Development Agreement (the “Term”).
3.02 Termination. Notwithstanding the foregoing, this Agreement may be terminated by either
Party, for any reason whatsoever, by providing sixty (60) days’ written notice to the
non-terminating Party, and the City has agreed to provide such notice to the County upon
Vantage’s written request. If, upon providing or receiving notice of termination under this
Section, the County has begun performance of Services under this Agreement, the County
shall complete the work on that specific roadway and Vantage shall pay, as may be required
by the terms of this Agreement, for the completion of work on that specific roadway before
any Party is released from the terms and obligations of this Agreement.
ARTICLE IV
MISCELLANEOUS
4.01 Assignment; Binding Upon Successors. This Agreement may not be assigned by any Party
without the express written consent of all other parties, which consent may be granted,
withheld or conditioned in a Party’s sole and absolute discretion. This Agreement shall be
binding upon each Party’s successors and assigns.
4.02 Applicable Law and Venue. This Agreement shall be construed according to the laws of
the State of Wisconsin without regard to the law on conflicts of law. Any actions or
proceedings arising in connection with this Agreement shall be venued exclusively in a
state or federal court of competent jurisdiction located in Ozaukee County, Wisconsin.
4.03 Entire Agreement. This Agreement constitutes the entire agreement between the Parties
relating to the subject matter hereof and all prior agreement relative hereto that are not
contained herein are terminated.
4.04 Nothing in this Agreement shall require the County to provide any Services beyond that
required under Wisconsin law.
[Signatures on Next Page]
Page 46 of 69
4
61530612
IN WITNESS WHEREOF, the Parties have executed this Agreement as of the Effective
Date.
COUNTY OF OZAUKEE CITY OF PORT WASHINGTON
By:_____________________ By:_________________________
Its:______________________ Its:_________________________
ACKNOWLEDGED:
V ANTAGE DA TA CENTERS
MANAGEMENT COMPANY , LLC
By:_____________________
Its:______________________
Page 47 of 69
Item: 8.a.2.
Agenda Item Information Sheet
To: Public Works Committee
From: Jon Edgren, Public Works Director
Meeting Date: May 21, 2026
Department/Office: Highway Department
Item Name: CTH Y Road Closure for Newburg Fireman's Parade
Summary:
BACKGROUND INFORMATION:
As part of the annual Village of Newburg’s Fireman’s Picnic, the Fire Department is interested
in closing a portion of CTH Y for their annual Fireman’s Parade. (See attached application and
exhibit maps.)
The closure would be based upon safety concerns with parade vehicles and attendees blocking
roadway access in preparation for, during and immediately after the parade.
The closure would occur on Sunday, June 7th, 2026, from approximately 11am to 2pm.
ANALYSIS:
Highway Department staff have no concerns about approving the request. However, the approval
should be conditional on the Village of Newburg’s acceptance of responsibility and Town of
Saukville authorization to allow Singing Hill Road to be used as a detour route.
Recommended Action:
Approve the CTH Y closure as proposed conditionally upon the Village of Newburg’s
acceptance of responsibility, and Town of Saukville’s authorization to use Singing Hill Road as a
detour route.
Attachments:
1. Newburg Fire Dept - 2026 Parade Permit w-Map
Page 48 of 69
Ozaukee County Highway Department
410 South Spring Street
Port Washington, WI 53074-0994
Jon E. Edgren - Public Works Director
Phone 262-238-8335 Fax 262-238-8343
APPLICATION BY MUNICIPALITY FOR PERMISSION
TO DETOUR COUNTY TRUNK HIGHWAY TRAFFIC
Application Date: March 28, 2026 Municipality:
~~~~~~~~~~~
Newburg
Highway to be closed: HwyY
HWY33 To: Singing Hill Road
Date of closure: June 7th, 2026 Est. Timeframe: 11am-2pm
~~~~--~~~~~~~~~~~
Proposed Temporary Route/Traffic Control Plan:
Previus attached parade route.
Reason for Detour:
I
Contact Information:
Name: Chris Becker
Org/Muni: Newburg Fire Department
Address: 508 MainSt. PO Box 140
Newburg WI, 53060
Phone: 262-323-6759 or 262-675-6262
General Conditions:
Parade
1. The municipality shall accept full responsibility for the use of the local roads and streets on the temporary routing of the County Trunk Highway and it
shall make no claim against the county by reason of their use, and shall indemnify the county, its agents, officers and employees , against any and all
loss, damages and costs or expenses which the county may sustain, incur or be required to pay by reason of any person or persons suffering personal
injury, death or property loss resulting from closure of the County Trunk Highway or from creation, use or maintenance of the detour.
2. The municipality shall minimize as practicable the duration of the closure of the County Trunk Highway, including providing for assembly and
dispersal of parades in areas removed from the County Trunk Highway.
3. Applicant will erect, maintain, and remove all traffic control devices needed to affect the closure.
4. Additional conditions:
Conditional upon the Village of Newburg's acceptance of responsibility, and the Town of Saukville's approval to use Singing Hill Road as a detour route.
The above municipal ity hereby requests permission to close the marked route as described, during which time the municipality will provide a temporary
route for county trunk highway traffic as designated in this application. The municipality agrees to and will abide by the conditions listed above, which is
made by th ndersigned municipal official under proper authority to act on behalf of the municipality represented above .
SIG
President
TITLE
Permission is hereby granted to close a county trunk highway route as described above.
HIGHWAY COMMISSIONER DATE
Newburg Fire Departme nt
Page 49 of 69
Newburg Parade Plann ing )
j_ Pol•ce.. Otf1c..e.r- .t\}e.i,Jb u rs (c..t>.r-
i 8 0..rr1c C\. t\e.s (woo,\ /.I· o.me..
. \ •
(l) c.~ol- i ol'\ +~p4:! bdwj[".11
'on~s
Lt t<>t~I ~pot6
B~ ~1' -~1 t13 e,
\ \ ·, \ (' ~ fl'\
r N~ wbv r5 1. PO Ne(..L)bt> rj i r 1 re. mtAtj/;..:c ;>1~i
;;l f3~Y'rt<..li\t.\e.6 (lc)c><?J) A fr~me-
I I
x
00
1 O:i."l>kee.. Ct'{ Pol i<;.~ Ofhcer
:1 r'l'1 e.+ ~l I fi: l.\1 n" b~n· l .:J ~ _
w/o...r-<"ow poin+i ,..'j +? ·fh~
le.+.(
_, . '
A
,
;( 0 , ...
XO
IC \
f).ine)
1 Fi re. 'mo. n/ 7..vom"n
Q plo..!> t-i c:. A ~r"G\.tn~
~ cone!.~
.;.? f3o..r"" ; cc~j~!i ·• ;) '"Oi1~.S
1 PO C.. M ·k e J=', ."1 ~..; ~v .- (tr.,c:.k)
~ /
Page 50 of 69
•
Newburg Fir
Department
>telueschen
!Sidents Park
Center "' West Entrance... ~
Riveredge Nature 0
Page 51 of 69
Item: 8.a.3.
Agenda Item Information Sheet
To: Public Works Committee
From: Jon Edgren, Public Works Director
Meeting Date: May 21, 2026
Department/Office: Highway Department
Item Name: Backhoe Compactor Purchase
Summary:
BACKGROUND INFORMATION:
Ozaukee County Highway staff have seen the need for a Backhoe Compactor from time-to-time
for our excavation operations to properly compact a trench, and would rent one as needed.
However, we have seen an increased need for preventing trench settling and performing soil
stabilization on Ozaukee County Planning & Parks (P&P) Department projects.
Given our project work on the CTH W Oxbow this summer for the P&P Department, Cedarburg
Foreman Charlie Schlessinger investigated the potential to purchase one as we had already
agreed to rent one.
ANALYSIS:
Our Cedarburg staff are using an Indeco IHC150 Compactor for the Oxbow project, and have
already committed to a monthly rental of $1,500 for the first month, but the rental agency has
stated that we could deduct the rental cost from the overall purchase. Additionally, based upon
our expected future P&P workload, Director Andrew Struck has agreed to cover $8,000 of the
Compactor as part of their construction grant.
Therefore, based upon the invoice (attached) for $13,142, Ozaukee County Highway Department
would only be responsible for $3,642 following reduction of the $9,500.
Recommended Action:
Approve the purchase of the Indeco IHC150 Compactor from Miller-Bradford & Risberg.
Attachments:
1. Miller-Brad - Backhoe Compactor Quote
Page 52 of 69
~MILLER-BRADFORD
mill& RISBERG, INC.
www. miller-brad ford. com
Ship To: IN STORE PICKUP
Invoice To: OZAUKEE COUNTY HWY DEPT
410 S SPRING ST
PO BOX 994
Corporate Office:
W250 N6851 Hwy 164
P.O. Box 904
Sussex, WI 53089
1-800-242-3115
Branch
02 - SUSSEX
Date
05/04/2026
Account No
OZAUK002
Ship Via
Tax ID No
DeForest, WI 1-800-585-7219
De Pere, WI 1-800-638-7448
Eau Claire, WI 1-800-585-7232
Marathon, WI 1-888-886-4410
Negaunee, MI 1-800-562-9770
Rockford, IL 1-800-585-7231
Time
I Pa;e
9:00:19 (0)
Phone No I Est No O O
2622848338 Q00855
Purchase Order
OB1900
I Salesperson
SAWYER HERDEN SH2
PORT WASHINGTON WI 53074
EQUIPMENT ESTIMATE - NOT AN INVOICE
Description ** Q U 0 T E ** EXPIRY DATE: 06/03/2026
Stock #: 025844
Hours: 0
New 2026 IN IHC150
Serial #: Cl500138
New 2026 INDECO IHC150 COMPACTOR
ORIGINAL SALES PRICE:$14,642.00
LESS RENTALS BILLED: ($1,500.00)
CARRYING CHARGE STARTS ON RENTAL AFTER 5-20-2026
Sale # 01 Subtotal:
Stock #: 026098
Hours: 0
New 2026 MI ASK140
Total:
Serial #: 026098
NEW 2026 MISCELLANEOUS ASK140 BRACKET CAP W/PINS FOR IHC-150
Sale # 02 Subtotal:
Authorization:
Your salesperson was SAWYER HERDEN
THANK YOU FOR CHOOSING MILLER-BRADFORD & RISBERG .
PERFORMANCE YOU CAN COUNT ON!
Thank You For Your Business!
Total:
Subtotal:
Quote Total:
Amount
13142.00
13142.00
13142.00
.01
.01
.01
13142.01
13142.01
Page 53 of 69
Item: 8.a.4.
Agenda Item Information Sheet
To: Public Works Committee
From: Jon Edgren, Public Works Director
Meeting Date: May 21, 2026
Department/Office: Highway Department
Item Name: CTH W Bid Award
Summary:
BACKGROUND INFORMATION:
As part of the Highway Department’s 2026 Capital Improvement Plan (CIP), we proposed to
reconstruct CTH W from STH 33 to Schowalter Street with an estimated budget of $3,000,000
though the majority of funding will be covered by Wisconsin Department of Transportation
(WisDOT) Grants.
In October of 2020, the Ozaukee County Public Works Committee approved acceptance of
$1,000,000 in a WisDOT Local Road Improvement Program – Supplemental (LRIP-S) grant,
and we have applied additional WisDOT County Highway Improvement Supplemental (CHIS)
grants in subsequent years totaling roughly $2.5M in funding. However, Ozaukee County is
responsible for 10% of eligible costs and all ineligible costs, which we’ve estimated to be
approximately $800,000.
raSmith, as our design consultant, put together plans and specifications over the last several
years, and created a bid packet that gave Ozaukee County options in case bids came in higher
than expected by creating a Base Bid and two Alternates:
Base Bid (Sections 1 and 2): All work necessary by the contractor.
Section 3 Alternate: Paving of the highway, which Ozaukee County could perform.
Section 4 Alternate: Supplying of the box culverts, which Ozaukee County Planning &
Parks (P&P) could supply.
ANALYSIS:
The Ozaukee County Highway Department opened bids for the CTH W from STH 33 to
Schowalter Street project on Tuesday, April 7th at 10am, and we received three bids. (See
attached bid summary.)
In all bid variations including Base Bid, Section 3 Alternate and/or Section 4 Alternate, Vinton
Construction was the low bidder.
Based upon the low bid costs, availability of WisDOT grant funds and P&P using grant funds to
purchase the box culverts, our recommendation is to award the contract to Vinton Construction
Page 54 of 69
with the Base Bid + Alternate Section 3 for $2,054,362.66.
Recommended Action:
Award the CTH W Base Bid and Alternate Section 3 to Vinton Construction for $2,054,362.66.
Attachments:
1. CTH W - STH 33 to Schowalter St - Bid Summary
Page 55 of 69
Page 1 of 3
CTH W - STH 33 to Schowalter Street (#10104517)
Owner: Ozaukee County Highway Department
raSmith Project Number: 2210149
Bid Summary: 04/07/2026 10:00 AM CDT
Item No. Item Description UofM Quantit
y Unit Price Extension Unit Price Extension Unit Price Extension
Section 1: Roadway Items
1 Clearing & Grubbing STA 11 $550.00 $6,050.00 $850.00 $9,350.00 $561.00 $6,171.00
2 Tree Removal ID 140 $65.00 $9,100.00 $40.00 $5,600.00 $66.30 $9,282.00
3 Removing Small Pipe Culverts EACH 11 $665.27 $7,317.97 $620.00 $6,820.00 $524.00 $5,764.00
4 Removing Structure 6x6-FT Box Culvert STA 64+00 EACH 1 $10,011.90 $10,011.90 $8,700.00 $8,700.00 $7,140.00 $7,140.00
5R e m o v i n g P a v e m e n t SY 10000 $7.57 $75,700.00 $0.01 $100.00 $6.01 $60,100.00
6 Removing Curb & Gutter LF 51 $10.00 $510.00 $9.00 $459.00 $35.79 $1,825.29
7 Removing Concrete Slope Paving SY 2200 $3.50 $7,700.00 $0.01 $22.00 $4.09 $8,998.00
8 Removing Storm Sewer 36-Inch LF 84 $19.90 $1,671.60 $25.00 $2,100.00 $61.20 $5,140.80
9 Excavation Common (Estimated 3,500 CY) LS 1 $289,200.00 $289,200.00 $660,000.00 $660,000.00 $287,563.54 $287,563.54
10 Excavation Below Subgrade CY 5000 $21.15 $105,750.00 $20.00 $100,000.00 $28.73 $143,650.00
11 Borrow CY 13400 $0.01 $134.00 $0.01 $134.00 $30.63 $410,442.00
12 Fine Grading for Asphaltic Paving SY 11000 $1.50 $16,500.00 $0.01 $110.00 $1.16 $12,760.00
13 Obliterating Old Road LS 1 $20,000.00 $20,000.00 $0.01 $0.01 $156,546.31 $156,546.31
14 Base Aggregate Dense 3/4-Inch (Shoulde r & Gravel Driveways) TON 390 $35.90 $14,001.00 $26.00 $10,140.00 $19.89 $7,757.10
15 Base Aggregate Dense 1 1/4-Inch TON 7550 $11.00 $83,050.00 $15.00 $113,250.00 $20.65 $155,907.50
16 Base Aggregate Dense 3-inch (for EBS and Off-Alignment Reinforcement) TON 10000 $24.23 $242,300.00 $23.00 $230,000.00 $23.66 $236,600 .00
17 Concrete Curb & Gutter 30-Inch Type D LF 640 $38.00 $24,320.00 $21.45 $13,728.00 $37.23 $23,827.20
18 Concrete Sidewalk 5-Inch SF 1370 $10.45 $14,316.50 $8.15 $11,165.50 $9.91 $13,576.70
19 Concrete Driveway 6-Inch SY 207 $83.00 $17,181.00 $79.95 $16,549.65 $81.13 $16,793.91
20 Riprap Medium CY 40 $140.00 $5,600.00 $170.00 $6,800.00 $76.50 $3,060.00
21 Temporary Restoration/Seeding SY 5600 $1.20 $6,720.00 $0.01 $56.00 $0.87 $4,872.00
22 Silt Fence LF 5000 $1.90 $9,500.00 $1.80 $9,000.00 $2.24 $11,200.00
23 Erosion Mat Urban Class I Type B SY 7500 $1.89 $14,175.00 $1.70 $12,750.00 $2.04 $15,300.00
24 Turbidity Barriers SY 900 $29.00 $26,100.00 $35.00 $31,500.00 $61.20 $55,080.00
25 Inlet Protection EACH 10 $70.00 $700.00 $55.00 $550.00 $127.50 $1,275.00
26 Temporary Ditch Checks EACH 20 $70.00 $1,400.00 $50.00 $1,000.00 $153.00 $3,060.00
27 Culvert Pipe Checks EACH 6 $25.00 $150.00 $18.00 $108.00 $51.00 $306.00
28 Lawn Restoration, Permanent SY 6000 $4.70 $28,200.00 $1.98 $11,880.00 $1.12 $6,720.00
29 Geotextile Type SAS SY 20000 $1.80 $36,000.00 $0.01 $200.00 $2.97 $59,400.00
30 Geogrid Type SR SY 10000 $1.80 $18,000.00 $0.01 $100.00 $4.59 $45,900.00
31 Geogrid Tensar InterAX NX650 SY 6000 $6.00 $36,000.00 $0.01 $60.00 $7.14 $42,840.00
Vinton Construction Co. Musson Bros., Inc. Super Western, Inc.
Page 56 of 69
Page 2 of 3
Item No. Item Description UofM Quantit y Unit Price Extension Unit Price Extension Unit Price Extension
Vinton Construction Co. Musson Bros., Inc. Super Western, Inc.
32 Traffic Control LS 1 $83,000.00 $83,000.00 $80,000.00 $80,000.00 $7,522.50 $7,522.50
33 Staging/Phasing LS 1 $1,000.00 $1,000.00 $25,000.00 $25,000.00 $107,883.81 $107,883.81
34 Signing Ea 10 $200.00 $2,000.00 $399.00 $3,990.00 $525.30 $5,253.00
35 Marking Line Epoxy 4-Inch LF 11900 $0.47 $5,593.00 $0.47 $5,593.00 $0.48 $5,712.00
36 Marking Line Epoxy 8-Inch LF 10 $1.25 $12.50 $1.25 $12.50 $1.28 $12.80
37 Marking Word Epoxy EACH 1 $498.90 $498.90 $498.90 $498.90 $508.88 $508.88
38 Marking Stop Line Epoxy 12-Inch LF 16 $20.15 $322.40 $20.15 $322.40 $20.55 $328.80
39 Conduit Rigid Nonmetallic Sche dule 40 2-Inch LF 325 $13.05 $4,241.25 $13.05 $4,241.25 $13.31 $4,325.75
40 Conduit Loop Detector LF 50 $23.25 $1,162.50 $23.25 $1,162.50 $23.72 $1,186.00
41 Removing Pull Boxes EACH 1 $730.00 $730.00 $730.00 $730.00 $744.60 $744.60
42 Pull Boxes Steel 24x36-Inch EACH 1 $1,843.00 $1,843.00 $1,843.00 $1,843.00 $1,879.86 $1,879.86
43 Loop Detector Lead In Cable LF 510 $7.60 $3,876.00 $7.60 $3,876.00 $7.75 $3,952.50
44 Loop Detector Wire LF 250 $6.30 $1,575.00 $6.30 $1,575.00 $6.43 $1,607.50
45 Sawing Asphalt & Concrete LF 500 $3.50 $1,750.00 $1.95 $975.00 $3.06 $1,530.00
46 Adjusting Sanitary Manhole EACH 1 $1,020.00 $1,020.00 $1,500.00 $1,500.00 $918.00 $918.00
47 Remove, Relocate, and Provide Te mporary Mailboxes EACH 7 $150.00 $1,050.00 $60.00 $420.00 $316.20 $2,213.40
Section 1 Subtotal: $1,237,033.52 $1,393,971.71 $1,964,437.75
Section 2: Storm Sewer Items
48 Culvert Pipe Reinforced Concrete Class IV 15-inch LF 64 $126.57 $8,100.48 $88.00 $5,632.00 $187.68 $12,011.52
49 Apron Endwalls for Culvert Pipe Reinfo rced Concrete 15-inch EACH 6 $1,265.22 $7,591.32 $1,100.00 $6,600.00 $2,754.00 $16,524.00
50 Culvert Pipe Reinforced Concrete Class IV 18-Inch LF 80 $140.79 $11,263.20 $90.00 $7,200.00 $190.74 $15,259.20
51 Apron Endwalls for Culvert Pipe Reinfo rced Concrete 18-Inch EACH 6 $1,442.36 $8,654.16 $1,200.00 $7,200.00 $2,856.00 $17,136.00
52 Apron Endwalls for Culvert Pipe Reinfo rced Concrete 24-Inch EACH 1 $1,786.78 $1,786.78 $1,600.00 $1,600.00 $3,060.00 $3,060.00
53 Storm Sewer Pipe Reinforced Concrete Class III 24-Inch LF 110 $139.17 $15,308.70 $130.00 $14,300.00 $185.64 $20,420.40
54 Storm Sewer Pipe Reinforced Concre te Class IV 15-Inch LF 19 $134.03 $2,546.57 $100.00 $1,900.00 $214.20 $4,069.80
55 Storm Sewer Pipe Reinforced Concre te Class IV 24-Inch LF 201 $148.35 $29,818.35 $130.00 $26,130.00 $229.50 $46,129.50
56 Storm Sewer Pipe Reinforced Conc rete Class V 12-Inch LF 204 $121.70 $24,826.80 $95.00 $19,380.00 $164.22 $33,500.88
57 Catch Basins 3-FT Diameter (Inlet Covers Type B) EACH 2 $3,696.58 $7,393.16 $3,200.00 $6,400.00 $2,550.00 $5,100.00
58 Catch Basins 4-FT Diameter (Inlet Covers Type A) EACH 1 $5,416.93 $5,416.93 $4,000.00 $4,000.00 $3,162.00 $3,162.00
59 Catch Basins 2x3-FT (Inlet Covers Type H) EACH 2 $3,722.80 $7,445.60 $3,500.00 $7,000.00 $2,754.00 $5,508.00
60 Manholes 4-FT Diameter (Manhole Covers Type J) EACH 2 $4,722.57 $9,445.14 $3,750.00 $7,500.00 $2,856.00 $5,712.00
61 Manholes 5-FT Diameter (Manhole Covers Type J) EACH 2 $5,116.47 $10,232.94 $4,750.00 $9,500.00 $4,080.00 $8,160.00
62 Inlets 2x2-FT (Inlet Covers Type S) EACH 2 $11,262.73 $22,525.46 $2,750.00 $5,500.00 $3,876.00 $7,752.00
63 Inlets Median 1 Grate (Inlet Covers Type MS) EACH 1 $3,794.62 $3,794.62 $3,500.00 $3,500.00 $2,958.00 $2,958.00
64 Install & Assemble County Supplied 68' - 10' x 4' Box Culvert STA 76+00 w/ Apron and Wingwalls LS 1 $94,755.13 $94,755.13 $85,000. 00 $85,000.00 $163,200.00 $163,200.00
Page 57 of 69
Page 3 of 3
Item No. Item Description UofM Quantit y Unit Price Extension Unit Price Extension Unit Price Extension
Vinton Construction Co. Musson Bros., Inc. Super Western, Inc.
65
Install & Assemble County Supplied 85.5' - 25'-2" x 7' Aluminum Box Culvert
STA 80+84 w/ Headwall and Wingwalls LS 1 $219,000.00 $219,000.00 $150,000.00 $150,000.00 $201,960.00 $201,960.00
66 Channel Bed Material CY 180 $205.00 $36,900.00 $100.00 $18,000.00 $88.74 $15,973.20
67 Boulders EACH 60 $200.00 $12,000.00 $95.00 $5,700.00 $71.40 $4,284.00
Section 2 Subtotal: $538,805.34 $392,042.00 $591,880.50
Base Bid (Sections 1 and 2) Total: $1,775,838.86 $1,786,013.71 $2,556,318.25
Section 3: Asphalt Items (Alternate Bid; Base Bid Assume County to Pave)
68 HMA Pavement 3 MT 58-28 S (4.0" Binder Layer) TON 2160 $62.20 $134,352.00 $62.20 $134,352.00 $63.44 $137,030.40
69 HMA Pavement 4 MT 58-28 S (2.0" Surface Layer) TON 1550 $73.45 $113,847.50 $73.45 $113,847.50 $74.92 $116,126.00
70 Asphaltic Surface (Paths) TON 130 $93.40 $12,142.00 $93.40 $12,142.00 $95.27 $12,385.10
71 Asphaltic Surface Driveways and Field Entrances TON 173 $105.10 $18,182.30 $105.10 $18,182.30 $107.20 $18,545.60
Section 3 Alternate Subtotal: $278,523.80 $278,523.80 $284,087.10
Base Bid (Sections 1 and 2) plus Alternate Section 3 Total: $2,054,362.66 $2,064,537.51 $2,840,405.35
Section 4: Culvert Supplied Items (Alternate Bid; Base Bid Assume County Supplies)
72 Supply 68' - 10' x 4' Concrete Box Culvert STA 76+00 w/ Apron and Wingwalls LS 1 $80,000.00 $80,000.00 $85,000.00 $85,000.00 $127,50 0.00 $127,500.00
73 Supply 85.5' - 25'-2" x 7' Alum inum Box Culvert STA 80+84 w/ Headwall and Wingwalls LS 1 $275,000.00 $275,000.00 $300,000.00 $300,0 00.00 $336,600.00 $336,600.00
Section 4 Alternate Subtotal: $355,000.00 $385,000.00 $464,100.00
Base Bid (Sections 1 and 2) plus Alternate Section 4 Total: $2,130,838.86 $2,171,013.71 $3,020,418.25
Base Bid (Sections 1 and 2) plus Alternate Sections 3 and 4 Total: $2,409,362.66 $2,449,537.51 $3,304,505.35
Page 58 of 69
Item: 8.a.5.
Agenda Item Information Sheet
To: Public Works Committee
From: Jason Dzwinel, County Administrator
Meeting Date: May 21, 2026
Department/Office: Dept of Administration
Item Name: Ordinance: Create Section 6.05 of the Ozaukee County Code of Ordinances - Highway Department
Municipal Contracts
Summary:
This ordinance creates Section 6.05 of the Ozaukee County Code of Ordinances to
formally authorize the Highway Commissioner, with approval from the Public Works
Committee, to enter into contracts with municipalities within Ozaukee County for highway
and street-related services.
Under the ordinance, and consistent with Wisconsin Statutes §83.035, the County
Highway Department may provide construction and maintenance services for roads and
streets in cities, villages, and towns. The authority also includes furnishing road supplies
and equipment to municipalities as part of those services.
The ordinance primarily serves to:
• Establish clear local authorization for intergovernmental highway service
agreements;
• Align county practice with existing state law;
• Clarify oversight by requiring Public Works Committee approval; and
• Support efficient sharing of highway department expertise, equipment, and
operational capacity with local municipalities.
The ordinance does not create new regulatory requirements for municipalities or residents.
Instead, it provides a formal framework for cooperative public works arrangements already
contemplated under Wisconsin law.
Recommended Action:
Approve the ordinance to move forward to the County Board for final action.
Attachments:
1. Ordinance - Highway Municipal Contracts
Page 59 of 69
ORDINANCE NO.
HIGHWAY DEPARTMENT MUNICIPAL CONTRACTS
An Ordinance Amending Chapter VI Highways, of the Ozaukee County Code of Ordinances
pertaining to the creation of Section 6.05 Highway Department Municipal Contracts.
The County Board of Supervisors of the County of Ozaukee does ordain that section 6.05
of the Ozaukee County Code of Ordinances be created to read:
6.05 HIGHWAY DEPARTMENT MUNICIPAL CONTRACTS
Pursuant to Wisconsin Statutes section 83.035 as in effect at any given time, the Highway
Commissioner, with the approval of the Public Works Committee, is authorized to
execute contracts for the purpose of enabling the county to construct and maintain streets
and highways in cities, villages and towns within the Ozaukee County. Maintenance
includes the furnishing of any road supplies and equipment to these municipalities.
This Ordinance shall take effect upon passage and publication.
Dated at Port Washington, Wisconsin, 3rd day of June, 2026.
Summary: Creating Ozaukee County Ordinance allowing Highway Commissioner, with Public
Works Committee approval, to execute contracts with municipalities for road construction /
maintenance.
Vote Required: Majority
Public Works Committee
Page 60 of 69
Item: 8.a.6.
Agenda Item Information Sheet
To: Public Works Committee
From: Jon Edgren, Public Works Director
Meeting Date: May 21, 2026
Department/Office: Highway Department
Item Name: CTH W Wetland Mitigation Credit Purchase
Summary:
BACKGROUND INFORMATION:
As previously discussed, the reconstruction of CTH W from STH 33 to Schowalter Street is scheduled for this year,
with the majority of construction costs covered by Wisconsin Department of Transportation (WisDOT) grants.
However, one portion that isn’t covered is the Wetland Mitigation Credits.
Wetland Mitigation Credits are purchased to “replace” wetlands when they’re filled as part of a construction project.
In the case of CTH W, we had originally hoped that the work being performed on the Oxbow would fulfill the
requirement for credits, but the US Army Corps of Engineers (USACOE) wouldn’t allow the work performed on the
Oxbow project to suffice. Therefore, we need to purchase the credits, and Matt Aho, Ozaukee County’s Planning &
Parks Dept Program Manager, has been working to secure the credits.
ANALYSIS:
Based upon the engineering design, we’re estimating to impact 2.20 acres of wetland as part of the CTH W Highway
Reconstruction and Fish Creek Restoration, and the USACOE requires 1.1 credits per acre of impact. Therefore,
we’re required to purchase 2.42 credits.
Currently, we have found the required Sedge Meadow wetland mitigation bank from a private bank, Barns Prairie,
that has 2.35-acres available for purchase. Their cost for credits are $148,600/acre, so we will owe roughly
$349,210.
Mr. Aho is working through the USACOE to determine if they can waive the remaining .07-acre balance of wetland
credits that are owed. Otherwise, we will need to seek those elsewhere.
Here’s our estimated current budget status once we would submit for reimbursement upon the completion of the
project:
2026 Construction Budget $800,000
Engineering - $20,000
Right-of-Way Acquisition - $100,000
Construction - $230,000
Sub-Total Remaining $450,000
Therefore, we request to use up to $375,000 for purchase from Barns Prairie and another source if required.
FISCAL IMPACT:
Balance Current Year: $375,000
Next Year’s Estimated Cost: --
Page 61 of 69
FUNDING SOURCE:
County Levy: X ($375,000)
Non-County Levy: --
Indicate source: --
Recommended Action:
Authorize the Public Works Director to purchase wetland mitigation credits up to $375,000 for the CTH W project.
Attachments:
None
Page 62 of 69
Item: 8.b.
Agenda Item Information Sheet
To: Public Works Committee
From: Jon Edgren, Public Works Director
Meeting Date: May 21, 2026
Department/Office: Highway Department
Item Name: Management/Financial/Informational Reports
Summary:
Highway Financials - May 2026
Recommended Action:
None
Attachments:
1. Highway Financials - May 2026
Page 63 of 69
Current
Month
Actual
2026
YTD
Actual
2026
Total
Budget
Budget
Balance
%
Budget
YTD
Revenues
Taxes:
205-1-01-41110-000 Property Tax 276,291.00 828,873.00 3,315,492.00 2,486,619.00 25.00%
Total Taxes 276,291.00 828,873.00 3,315,492.00 2,486,619.00 25.00%
Intergovernmental Revenues:
205-1-01-42330-000 St Aid - Transportation Aid 445,6 63.51 1,780,710.00 1,335,046.49 25.03%
Total Intergovernmental Revenues 445,663.51 1,780,710.00 1,335,046.49 25.03%
Total Revenues $276,291.00 $1,274,536.51 $5,096,202.00 $3,821,665.49 2 5.01%
Expenditures
Interdepartment Charges:
205-1-01-55310-000 CTHS General
Maintenance 90,377.91 297,941.16 2,244,160.92 1,946,219.76 13.28%
205-1-01-55320-000 CTHS Winter Maintenance 201,061.0 6 616,262.88 1,252,030.92 635,768.04 49.22%
205-1-01-55330-000 CTHS Construction 2,205.59 7,595.4 8 1,525,020.96 1,517,425.48 0.50%
205-1-01-55340-000 CTHS Bridge Construction 18,990.00 18,990.00 0.00%
205-1-01-55370-000 Surveying 55,999.92 55,999.92 0.00%
Total Interdepartment Charges 293,644.56 921,799.52 5, 096,202.72 4,174,403.20 18.09%
Total Operating Expenditures $293,644.56 $921,799.52 $ 5,096,202.72 $4,174,403.20 18.09%
Total Expenditures $293,644.56 $921,799.52 $5,096,202.72 $4,174,403.20 18. 09%
Net Increase (Decrease) ($17,353.56) $352,736.99 ($0.7 2) ($352,737.71)
-
4899124
8.61%
OZ-Curr:205-1-01
Ozaukee County
County Roads and Bridges
For the Three Months Ending Tuesday, March 31, 2026
3/31/2026
FRPnL2026 2026 Profit and Loss Statement
Page 64 of 69
Current
Month
Actual
2026
YTD
Actual
2026
Total
Budget
Budget
Balance
%
Budget
YTD
Revenues
Intergovernmental Charges $166,717.48 $624,246.87 $2,0 16,399.72 $1,392,152.85 30.96%
Total Revenues $166,717.48 $624,246.87 $2,016,399.72 $1,392,152.85 30. 96%
Expenditures
Salaries 54,110.97 193,059.12 632,999.52 439,940.40 30.50%
Supplies 19,442.36 67,446.52 335,499.36 268,052.84 20.10%
Interdepartment Charges 93,214.41 362,201.16 1,047,909 .60 685,708.44 34.56%
Other Expenses 55.00 (55.00) 0.00%
Total Operating Expenditures $166,767.74 $622,761.80 $ 2,016,408.48 $1,393,646.68 30.88%
Total Expenditures $166,767.74 $622,761.80 $2,016,408.48 $1,393,646.68 30. 88%
Net Increase (Decrease) ($50.26) $1,485.07 ($8.76) ($1, 493.83)
-
16952.8
5%
OZ-Curr:601-4
Ozaukee County
HWY State Highway System
For the Three Months Ending Tuesday, March 31, 2026
3/31/2026
FRPnL2026 2026 Profit and Loss Statement
Page 65 of 69
Current
Month
Actual
2026
YTD
Actual
2026
Total
Budget
Budget
Balance
%
Budget
YTD
Revenues
Intergovernmental Charges $85,266.38 $332,497.69 $1,83 4,914.84 $1,502,417.15 18.12%
Total Revenues $85,266.38 $332,497.69 $1,834,914.84 $1,502,417.15 18.1 2%
Expenditures
Salaries 13,700.95 41,401.99 353,499.84 312,097.85 11.71%
Supplies 37,278.03 163,791.36 848,999.52 685,208.16 19.29%
Purchased Services 1,099.74 (1,099.74) 0.00%
Interdepartment Charges 30,059.63 92,778.73 632,414.76 539,636.03 14.67%
Total Operating Expenditures $81,038.61 $299,071.82 $1 ,834,914.12 $1,535,842.30 16.30%
Total Expenditures $81,038.61 $299,071.82 $1,834,914.12 $1,535,842.30 16.3 0%
Net Increase (Decrease) $4,227.77 $33,425.87 $0.72 ($33 ,425.15)
4642481
.94%
OZ-Curr:601-5
Ozaukee County
HWY Local Roads Maintenance and Construction
For the Three Months Ending Tuesday, March 31, 2026
3/31/2026
FRPnL2026 2026 Profit and Loss Statement
Page 66 of 69
Current
Month
Actual
2026
YTD
Actual
2026
Total
Budget
Budget
Balance
%
Budget
YTD
Revenues
Interdepartmental Charges $159,020.83 $462,062.94 $1,0 93,740.00 $631,677.06 42.25%
Total Revenues $159,020.83 $462,062.94 $1,093,740.00 $631,677.06 42.25 %
Expenditures
Salaries 31,005.05 69,048.01 195,999.96 126,951.95 35.23%
Supplies 50,348.32 222,955.07 606,999.36 384,044.29 36.73%
Purchased Services 470.02 2,030.41 5,499.84 3,469.43 36.92%
Interdepartment Charges 81,013.03 169,208.58 285,240.0 0 116,031.42 59.32%
Total Operating Expenditures $162,836.42 $463,242.07 $ 1,093,739.16 $630,497.09 42.35%
Total Expenditures $162,836.42 $463,242.07 $1,093,739.16 $630,497.09 42.35 %
Net Increase (Decrease) ($3,815.59) ($1,179.13) $0.84 $ 1,179.97
-
140372.
62%
OZ-Curr:601-6
Ozaukee County
HWY Local Departments Non Highway
For the Three Months Ending Tuesday, March 31, 2026
3/31/2026
FRPnL2026 2026 Profit and Loss Statement
Page 67 of 69
Ozaukee County Highway Department
2026 Capital Outlay
Equipment Purchases
Fleet # Description Budget 2026 Cost
Amount (Over)
Under Budget Status
65 Betterment for Tow Plow $50,000.00 $1,073.50 In Progress
89 Chevy Silverado $56,000.00 Ordered
98 Ford F350 $4,052.66 In Progress
986 Lite Systems Message Board $14,815.58 In Progress
189 Diamond C 12 Ton Trailer $17,500.00 Ordered
335 Kubota Skid Steer $70,000.00 $64,618.32 In Progress
0001T Tow Plow $210,000.00 Ordered
$268,500.00 $84,560.06 $0.00
Other Capital Projects
Location Description Budget 2026 Cost
Amount (Over)
Under Budget Status
Port Corghi Tire Machine $50,000.00 $34,149.00 In Progress
Port Repave Yard $225,000.00 $0.00 Not Started
Waubeka Salt Dome Door $60,000.00 $36,997.00 $23,003.00 Completed
$335,000.00 $71,146.00 $23,003.00
$75,000.00
Page 68 of 69
Ozaukee County Highway Department
2026 Construction Report
2026 Levy Funded Highway Construction Projects
Project Type Miles Levy Budgeted Actual Budget vs Actual Budgeted Tons Actual Tons Complete
*CTH W - STH 33 to Schowalter Rd 5" Paving 0.40 $450,000.00 $ - $450,000.00 4,500
CTH K - CTH KW to Termaat Rd 2.5" Overlay; Widen to 28' 0.30 $100,000.00 $ - $100,000.00 750
CTH I - CTH Z to Fredonia-Kohler Rd Reconstruction 0.20 $60,000.00 -$ $60,000.00 450
CTH I - Hawthorne Dr to River Park Rd 2.5" Overlay 1.00 $225,000.00 -$ $225,000.00 2,500
$835,000.00 $0.00 $835,000.00 8,200 0
2024/2025 Levy Funded Highway Department Constructions Projects - Not Completed
Project Type Miles Levy Budgeted Actual Budget vs Actual Budgeted Tons Actual Tons Complete
CTH I - STH 33 to Shady Ln 2.5" Overlay 1.90 $450,000.00 $ - $450,000.00 4,800
CTH I - Lilac Ln to STH 33 2.5" Overlay; Widen to 30' 5.10 $1,100,000.00 -$ $1,100,000.00 13,000
CTH I - Shady Ln to Hawthorne Dr 2.5" Overlay 1.00 $225,000.00 -$ $225,000.00 2,500
$1,775,000.00 $0.00 $1,775,000.00 20,300 0
Split Funding Source Projects - Bid Work
Project Type
Total Project
Cost/Contract
Amt
Prior Year(s)
Cty Funds
Budgeted
2026 Cty Funds
Budgeted
Prior Year(s)
Expense
2026
Expense
Grand
Total
Under (Over)
Budget Complete
CTH W - STH 33 to Schowalter Rd Engineering $120,000.00 $60,000.00 $0.00 $146,881.76 $12,974.12 $159,855.88 ($99,855.88)
CTH W - STH 33 to Schowalter Rd ROW Acquisition $0.00 $135,375.58 $0.00 $135,375.58 ($135,375.58)
*CTH W - STH 33 to Schowalter Rd Construction $2,800,000.00 $300,000.00 $800,000.00 $0.00 $0.00 $0.00 $1,100,000.00
CTH KW - CTH H to Lake Drive Engineering $50,000.00 $0.00 $0.00 $0.00 $0.00 $50,000.00
CTH KW - CTH H to Lake Drive Pulverize/Repave $1,000,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
CTH W - CTH W (Port Rd) & CTH C (Pioneer Rd) Traffic Signals $200,000.00 $20,000.00 $0.00 $5,058.14 $2,453.08 $7,511.22 $12,488.78
CTH Y - CTH Y (Granville Rd) & CTH T (Lakefield Rd) Concrete Reconstruction $100,000.00 $0.00 $50,000.00 $0.00 $7,357.64 $7,357.64 $42,642.36
*All ongoing Projects $4,220,000.00 $430,000.00 $850,000.00 $287,315.48 $22,784.84 $310,100.32 $969,899.68
*CTH W - STH 33 to Schowalter Rd Construction - $550,000 budgeted in 2024 ($250,000 tax levy + $300,000 fund balance)
2026 Budget 2026 Actual Budget vs Actual
$835,000.00 0.00 $835,000.00
$850,000.00 $22,784.84 $827,215.16
$1,685,000.00 $22,784.84 $1,662,215.16
LRIP-S & CHI-S Funding (75%) - Const 2024
Funding
LRIP-S & CHI-S Funding (75%)
Levy Funded County Projects
Split Funding/Bid Work
CHI-D Funding (50/50 Split)
CHI-D Funding (50/50 Split) Const 2027
Signal Improvement
CHI Funding (50%); Engineering 2026
Page 69 of 69