RecordWell Data

_06162026-1054

Village of Saukville · Ozaukee County · meeting of Jun 16, 2026 · Minutes

Open the original document More from Village of Saukville

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

***FINANCE MINUTES*** June 16, 2026 SAUKVILLE MUNICIPAL CENTER AND VIA ZOOM 639 E. GREEN BAY AVE., SAUKVILLE, WI 53080 Village President Andy Hebein called the meeting to order at 6:02 p.m. Julie Friede gave the Statement of Public Notice. Members: Andy Hebein-present, Jim Nowlen-present, Bill Rudolph-present, Jesse Duckart-absent, Pamela Duckart-absent, Wendy Smith-present, and Brandon Donen-via zoom. Others Present: Dawn Wagner, Julie Friede, Jacob Verhelst, Dale Kropidlowski, Ray Hartmann, and Dave Arnott – Ruekert & Mielke. Approve Claims for May 2026 in the Amount of $410,131.39. Nowlen/Smith made a motion to a pprove Claims for May 2026 in the Amount of $ 410,131.39. Motion Carried. Investment Report Wagner stated the May 2026 Investment Report was provided in the packet. Sewer Service Area Amendment Arnott presented the Sewer Service Area Amendment. (Presentation Attached) Nowlen/Smith recommend to the Village Board to authorize Ruekert & Mielke to continue preparing the submittal for the Sewer Service Area Amendment (SSA) for the Wisconsin Department of Natural Resources (WDNR) and SEWRPC. Motion Carried. Arnott stated the submittal will come before the Village Board for final approval before submitting the SSA Amendment to the WDNR and SEWRPC. City of Port Washington & Village of Saukville Utility Service Agreement Wagner stated, a s part of the Village’s ongoing commitment to long -term infrastructure planning, the Village has been working on an upgrade to our current Sewer Service Area. As part of this planning process, Port Washington & Saukville staff worked cooperatively to identify future growth areas for each community to be served with sanitary sewer. Because there is land within each community’s growth area that could be served by the other community’s sanitary sewer and that developers may have a preference to be in the oth er sewer service area, staff developed an agreement to allow movement of land from one sewer service area to the other community’s sewer service area. This agreement will help facilitate efficient growth for each community by cooperatively moving land between sewer services areas. The Village’s Economic Development Consultant, Claude Lois & the Village Attorney has reviewed the proposed Agreement. The City of Port Washington Board of Public Works reviewed & recommended to the City Council the approval of the Utility Service Agreement on June 9th. The City Council will be reviewing the Agreement on June 16th. Finance Committee Minutes June 16, 2026 H:\Minutes\Finance Minutes - 2026\Finance - June 16, 2026 - draft.docx Rudolph/Nowlen recommend to the Village Board the approval of the City of Port Washington & Village of Saukville Utility Service Agreement. Motion Carried. Resolution #1443 - 2025 Compliance Maintenance Annual Report (CMAR) Hartmann stated the Village of Saukville has an A Rating for the CMAR. Rudolph/Smith recommend to the Village Board Resolution #1443 - 2025 Compliance Maintenance Annual Report (CMAR). Motion Carried. Sewer Rate Study Hartmann review the Sewer Rate Study comparing Sewer rate s with the neighboring communities . (Attached) WWTP Facilities Modification Plan – Biosolids Drying System Arnott presented the WWTP Facilities Modification Plan – Biosolids Drying System. (Presentation Attached) Hartmann noted he has been researching every option available due to the large investment. Arnott stated the Indirect Heat-Auger with Rotary Press Dewatering Unit is recommended. Nowlen/Smith recommended to the Village Board the WWTP Facilities Modification Plan – (Biosolids Drying System) to WDNR. Motion Carried. Well #4 PFAS Treatment Study & Pre-Design Report Arnott presented the Well #4 PFAS Treatment Study & Pre-Design Report. (Presentation Attached) Arnott stated the PFAS Treatment Compliance needs to be completed by 2031. Currently the Village of Saukville is on schedule to be in compliance by Fall of 2030 assuming it continues on the schedule for the Treatment System listed in the presentation. Smith/Donen recommend to the Village Board the Well #4 PFAS Treatment Study & Pre-Design Report with Task Order No. 2026-04 presented by Ruekert and Mielke, cost of study shall be paid from the PFAS Fund. Arnott noted that the Pilot Study authorization request will be listed on a future agenda. Review and Recommendation to Village Board as to Options Regarding the ATWELL Voluntary Permission Proposal Concerning Access to Village Owned Properties Wagner presented the Voluntary Permission Agreement with staff recommendation of Option #1(Grants permission for Survey, Appraisal Inspection and Soil Borings ) - $15,000.00 signing fee. Wagner stated this would be for three property groups, Village of Saukville, Village of Saukville Water Utility, and Village of Saukville Community Development Authority. The t otal signing fee of $45,000.00 , with the funding allocated separately among the three property groups. Rudolph/Smith recommend to the Village Board Option #1 of the ATWELL Voluntary Permission Proposal Concerning Access to Village Owned Properties. Motion Carried with Hebein Recused. Other Matters Wagner announced Dan Helm completed Certified Stormwater Inspector (CSI) course by the National Stormwater Center. Next Village Board Meeting is scheduled for July 7, 2026. Finance Committee Minutes June 16, 2026 H:\Minutes\Finance Minutes - 2026\Finance - June 16, 2026 - draft.docx Bid openings are scheduled on July 2, 2026 for the Tea Grant Project on Market Street. Special Village Board Meeting is scheduled for July 14, 2026 at 5:00 p.m. if needed. ADJOURNMENT Nowlen/Smith made a motion to adjourn. Motion carried at 7:16 p.m. Julie Friede Village Clerk VILLAGE OF SAUKVILLE SANITARY SEWER SERVICE AREA AMENDMENT Village Board Meeting June 16, 2026 D ave Arnott Team Leader / Project Manager, Ruekert & Mielke, Inc. Topics Covered  Need for Amendment  Proposed SSSA Amendment  Land Use & Zoning Updates  Capacity Calculations  SEWRPC & WDNR Approvals 2 Need For Amendment  Data Center Construction in Port Washington  City of Port Washington submitted an A mendment for SSSA changes, including areas other than the data center.  Some areas were desirable land between the V illage and the City.  The Village and City are working on Agreement ( in packet) for the SSSA.  Completing an amendment solidifies the SSSA f or future development in the Village. 3 Proposed SSSA Amendment  Added areas coincide with the a greement in progress with the City.  Do not necessarily need to be w ithin the current Village boundaries.  Existing SSSA = 3,001 Acres  Added SSSA = 683 Acres 4 5 Village Zoning Map  Existing Village Zoning with t he existing SSSA and added SSSA borders shown.  Zoning and Land Use may n eed to be updated in the next Comprehensive Plan update (2026-2027). 6 7 Future Land Use  For the Amendment, all land w ithin the existing and added SSSA must be assigned a future land use classification  Can be changed in the future, not b inding  Use to calculate future sanitary se wer flows, assuming the entire SSSA is developed. 8 9 Resulting Calculations 10 Resulting Calculations  All comparisons are made in Peak Hourly Flow at the WWTP  Future Theoretical Peak Hourly Flow (Existing and Ad ded SSSA)  4.134 MGD  Current WWTP Rated Peak Hourly Capacity  3.800 MGD  Typically this would require a full facilities plan to identify upgrades  In process of re-rating the WWTP to MGD 4.1.  Current design was based on conservative assumptions 11 SEWRPC and WDNR Submittals  SEWRPC governs SSSA boundary changes.  WDNR reviews relative to capacity and upgrades.  Separate submittal to WDNR to re-rate the WWTP c apacity will be completed prior to SEWRPC.  If WWTP can be shown with adequate capacity, S EWRPC SSSA Amendment should be straight- forward with approval. 12 VILLAGE OF SAUKVILLE WASTEWATER TREATMENT FACILITY BIOSOLIDS HANDLING FACILITIES MODIFICATIONS Village Board Meeting June 16, 2026 Dave Arnott Team Leader / Project Manager, Ruekert & Mielke, Inc. Topics Covered  Background  Past Activities  Planning Study  Recommended Plan  Preliminary Schedule  Next Steps 2 Background  Waste solids generated during treatment are:  Thickened in gravity thickener  Dewatered by belt filter press (installed in 1993, reaching end of life)  Dewatered solids are disposed of on agricultural land. 3 Background  Dewatered Solids are Class B Biosolids  WAC requires 180 days of storage when land application is prohibited.  Solids may only be applied to agricultural land growing crops for animal feed.  Solids must me incorporated in soil after application.  Total Coliform count must be below 2,000,000 colony forming units for land application  Prohibited for use as a soil amendments where exposure to humans is probable. 4 Background  Agricultural Land Availability  Suitable land is becoming more difficult to access  Setback distances, slope, nutrient loadings, and soil type regulation criteria need to be met for suitable land  Large farms generate large quantities of manure where additional nutrients from WWTF biosolids are not needed.  Growth in Village results in generation of more solids to be disposed of on agricultural land 5 Background  WDNR Interim Strategy  20 ppb threshold  Track and accumulate PFAS loading on soil  Notification requirements  Insurance hard to get  Application rate limit of 1.5 tons/acre if >20 ppb  Village Present Condition  Now at 22 ppb  Arkema has newer pretreatment system  Will help  Well 4 PFAS treatment will help 6 Background  If Land spreading Not An Option In Future  Waste Mgt. Landfill  Do Not Like Cake Biosolids Product, Water  Considering Dryer For Municipal Biosolids  Unknown, Far Into Future 7 Past Activities  Interest in Generating Class A biosolids resulted in pilot testing:  Different Technology for dewatering equipment  Indirect heat drying equipment.  Class A Biosolids generated from drying offers advantages  Reduction in volume of solids required for disposal  Approximate 80 percent reduction in volume when drying is used  Less stringent restrictions for land application  May be applied to land as a soil amendment where human exposure is probable.  Milorganite® is an example of Class A Biosolid  15% to 20% reduction in PFAS 8 Past Activities  Wisconsin Dells Lake Delton- Dryer installation visit  Pilot test was performed with this manufacturer 9 Planning Study  Biosolids Handling Facilities Modifications Plan  Planning Study in 2025  Flows rates, organic loadings and solids generation  Current planned developments, and SEWRPC population estimates to 2050 resulted in future projected flows and loadings less than average design capacity of WWTF  Identified facilities should be designed to accommodate WWTF design flows and loadings. 10 Planning Study  Alternative Equipment Evaluation  Dewatering equipment  Two manufacturers were identified that can provide equipment similar to the equipment pilot tested.  Drying Equipment-Produce Class A Biosolid  Indirect Heat Dryers  Auger  Paddle  Heated Air Dryer  Belt 11 Planning Study Indirect Heat -Auger Indirect Heat-Paddle Heated Air Belt 12 Recommended Plan  Indirect Heat-Auger Dryer with Rotary Press Dewatering Unit  Lowest Capital Cost  Dryer has several installations in Wisconsin  Similar O&M Cost to Indirect Heat- Paddle  Dewatering and Drying Equipment would be installed in existing sludge storage building  South side would be modified to accommodate new equipment  North side would be used for storage 13 Recommended Plan 14 Recommended Plan 15 Recommended Plan  Other WI Dryer Installations  Lake Delton  Fond du Lac  Waukesha  Reedsburg  River Falls  Beloit  Wausau  LaCrosse  Sheboygan  Stevens Point  Green Bay  Osseo  Marinette  Johnson Creek (in construction)  Keil  Portage  New London  Sun Prairie 16 Recommended Plan  Estimated Capital Cost  $12,562,300  Estimate includes construction cost, engineering and contingencies  Estimated Annual O&M Cost  $57,800  Village to Cash Fund Design of $706,700  Borrow Balance $11,855, 600 with CWFP 17 Next Steps  Submit Facilities Biosolids Modifications Plan – Biosolids Drying System to WDNR For Approval  After WDNR Approval, Village Approve Design Engineering and Construction Schedule  Design 2027  Construction 2028 - 2029 18 VILLAGE OF SAUKVILLE WELL NO. 4 PFAS TREATMENT Village Board Meeting June 16, 2026 D ave Arnott Team Leader / Project Manager, Ruekert & Mielke, Inc. Topics Covered  Background  Federal and WI Requirements  Test Results For PFAS  Schedule and Costs for Treatment  Task Order 2 Background Strong carbon-fluorine bonds Surfactants Hydrophobic (repels water) and oleophobic (repels oil, fat, grease) 5,000+ compounds Properties of hydrocarbon chain and polar end determine treatment options 3 Background  Best Producing Well in Village  405 Progress Drive  Dolomite well (shallow)  Open lineshaft vertical turbine well pump, 1000 gpm  Backup generator  Three service pumps  Reservoir  Treatment will improve health for Village  Treatment will help WWTF with biosolids compliance  Drinking water>>wastewater>>treatment>>biosolids.  >>farm field application 4 Federal and State Requirements  WI is Adopting US E PA Limits 5 Federal and State Requirements 6 Test Results For PFAS At Well 4 7 Schedule for Treatment System 8 Costs for Treatment System  Village c urrently has $1.1M of PFAS settlement money. 9 Task Order  Predesign and p ilot study methodology 10

Source: Village of Saukville website. First collected Oct 8, 2026.