***FINANCE MINUTES***
June 16, 2026
SAUKVILLE MUNICIPAL CENTER AND VIA ZOOM
639 E. GREEN BAY AVE., SAUKVILLE, WI 53080
Village President Andy Hebein called the meeting to order at 6:02 p.m.
Julie Friede gave the Statement of Public Notice.
Members: Andy Hebein-present, Jim Nowlen-present, Bill Rudolph-present, Jesse Duckart-absent, Pamela
Duckart-absent, Wendy Smith-present, and Brandon Donen-via zoom.
Others Present: Dawn Wagner, Julie Friede, Jacob Verhelst, Dale Kropidlowski, Ray Hartmann, and Dave
Arnott – Ruekert & Mielke.
Approve Claims for May 2026 in the Amount of $410,131.39.
Nowlen/Smith made a motion to a pprove Claims for May 2026 in the Amount of $ 410,131.39. Motion
Carried.
Investment Report
Wagner stated the May 2026 Investment Report was provided in the packet.
Sewer Service Area Amendment
Arnott presented the Sewer Service Area Amendment. (Presentation Attached)
Nowlen/Smith recommend to the Village Board to authorize Ruekert & Mielke to continue preparing the
submittal for the Sewer Service Area Amendment (SSA) for the Wisconsin Department of Natural Resources
(WDNR) and SEWRPC. Motion Carried.
Arnott stated the submittal will come before the Village Board for final approval before submitting the SSA
Amendment to the WDNR and SEWRPC.
City of Port Washington & Village of Saukville Utility Service Agreement
Wagner stated, a s part of the Village’s ongoing commitment to long -term infrastructure planning, the
Village has been working on an upgrade to our current Sewer Service Area. As part of this planning process,
Port Washington & Saukville staff worked cooperatively to identify future growth areas for each community
to be served with sanitary sewer.
Because there is land within each community’s growth area that could be served by the other community’s
sanitary sewer and that developers may have a preference to be in the oth er sewer service area, staff
developed an agreement to allow movement of land from one sewer service area to the other community’s
sewer service area. This agreement will help facilitate efficient growth for each community by
cooperatively moving land between sewer services areas.
The Village’s Economic Development Consultant, Claude Lois & the Village Attorney has reviewed the
proposed Agreement.
The City of Port Washington Board of Public Works reviewed & recommended to the City Council the
approval of the Utility Service Agreement on June 9th. The City Council will be reviewing the Agreement
on June 16th.
Finance Committee Minutes June 16, 2026
H:\Minutes\Finance Minutes - 2026\Finance - June 16, 2026 - draft.docx
Rudolph/Nowlen recommend to the Village Board the approval of the City of Port Washington & Village
of Saukville Utility Service Agreement. Motion Carried.
Resolution #1443 - 2025 Compliance Maintenance Annual Report (CMAR)
Hartmann stated the Village of Saukville has an A Rating for the CMAR.
Rudolph/Smith recommend to the Village Board Resolution #1443 - 2025 Compliance Maintenance Annual
Report (CMAR). Motion Carried.
Sewer Rate Study
Hartmann review the Sewer Rate Study comparing Sewer rate s with the neighboring communities .
(Attached)
WWTP Facilities Modification Plan – Biosolids Drying System
Arnott presented the WWTP Facilities Modification Plan – Biosolids Drying System. (Presentation Attached)
Hartmann noted he has been researching every option available due to the large investment.
Arnott stated the Indirect Heat-Auger with Rotary Press Dewatering Unit is recommended.
Nowlen/Smith recommended to the Village Board the WWTP Facilities Modification Plan – (Biosolids Drying
System) to WDNR. Motion Carried.
Well #4 PFAS Treatment Study & Pre-Design Report
Arnott presented the Well #4 PFAS Treatment Study & Pre-Design Report. (Presentation Attached)
Arnott stated the PFAS Treatment Compliance needs to be completed by 2031. Currently the Village of
Saukville is on schedule to be in compliance by Fall of 2030 assuming it continues on the schedule for the
Treatment System listed in the presentation.
Smith/Donen recommend to the Village Board the Well #4 PFAS Treatment Study & Pre-Design Report with
Task Order No. 2026-04 presented by Ruekert and Mielke, cost of study shall be paid from the PFAS Fund.
Arnott noted that the Pilot Study authorization request will be listed on a future agenda.
Review and Recommendation to Village Board as to Options Regarding the ATWELL Voluntary
Permission Proposal Concerning Access to Village Owned Properties
Wagner presented the Voluntary Permission Agreement with staff recommendation of Option #1(Grants
permission for Survey, Appraisal Inspection and Soil Borings ) - $15,000.00 signing fee. Wagner stated this
would be for three property groups, Village of Saukville, Village of Saukville Water Utility, and Village of
Saukville Community Development Authority. The t otal signing fee of $45,000.00 , with the funding
allocated separately among the three property groups.
Rudolph/Smith recommend to the Village Board Option #1 of the ATWELL Voluntary Permission Proposal
Concerning Access to Village Owned Properties. Motion Carried with Hebein Recused.
Other Matters
Wagner announced Dan Helm completed Certified Stormwater Inspector (CSI) course by the National
Stormwater Center.
Next Village Board Meeting is scheduled for July 7, 2026.
Finance Committee Minutes June 16, 2026
H:\Minutes\Finance Minutes - 2026\Finance - June 16, 2026 - draft.docx
Bid openings are scheduled on July 2, 2026 for the Tea Grant Project on Market Street.
Special Village Board Meeting is scheduled for July 14, 2026 at 5:00 p.m. if needed.
ADJOURNMENT
Nowlen/Smith made a motion to adjourn. Motion carried at 7:16 p.m.
Julie Friede
Village Clerk
VILLAGE OF SAUKVILLE
SANITARY SEWER SERVICE
AREA AMENDMENT
Village Board Meeting June 16, 2026
D
ave Arnott
Team Leader / Project Manager, Ruekert & Mielke, Inc.
Topics Covered
Need for Amendment
Proposed SSSA Amendment
Land Use & Zoning Updates
Capacity Calculations
SEWRPC & WDNR Approvals
2
Need For Amendment
Data Center Construction in Port Washington
City of Port Washington submitted an
A
mendment for SSSA changes, including areas
other than the data center.
Some areas were desirable land between the
V
illage and the City.
The Village and City are working on Agreement
(
in packet) for the SSSA.
Completing an amendment solidifies the SSSA
f
or future development in the Village.
3
Proposed SSSA Amendment
Added areas coincide with the
a
greement in progress with the
City.
Do not necessarily need to be
w
ithin the current Village
boundaries.
Existing SSSA = 3,001 Acres
Added SSSA = 683 Acres
4
5
Village Zoning Map
Existing Village Zoning with
t
he existing SSSA and added
SSSA borders shown.
Zoning and Land Use may
n
eed to be updated in the
next Comprehensive Plan
update (2026-2027).
6
7
Future Land Use
For the Amendment, all land
w
ithin the existing and added
SSSA must be assigned a
future land use classification
Can be changed in the future, not
b
inding
Use to calculate future sanitary
se
wer flows, assuming the
entire SSSA is developed.
8
9
Resulting
Calculations
10
Resulting Calculations
All comparisons are made in Peak Hourly Flow at the WWTP
Future Theoretical Peak Hourly Flow (Existing and Ad ded SSSA)
4.134 MGD
Current WWTP Rated Peak Hourly Capacity
3.800 MGD
Typically this would require a full facilities plan to identify upgrades
In process of re-rating the WWTP to MGD 4.1.
Current design was based on conservative assumptions
11
SEWRPC and WDNR Submittals
SEWRPC governs SSSA boundary changes.
WDNR reviews relative to capacity and upgrades.
Separate submittal to WDNR to re-rate the WWTP
c
apacity will be completed prior to SEWRPC.
If WWTP can be shown with adequate capacity,
S
EWRPC SSSA Amendment should be straight-
forward with approval.
12
VILLAGE OF SAUKVILLE
WASTEWATER TREATMENT
FACILITY
BIOSOLIDS HANDLING
FACILITIES MODIFICATIONS
Village Board Meeting June 16, 2026
Dave Arnott
Team Leader / Project Manager, Ruekert & Mielke, Inc.
Topics Covered
Background
Past Activities
Planning Study
Recommended Plan
Preliminary Schedule
Next Steps
2
Background
Waste solids generated during treatment are:
Thickened in gravity thickener
Dewatered by belt filter press (installed in 1993,
reaching end of life)
Dewatered solids are disposed of on agricultural
land.
3
Background
Dewatered Solids are Class B Biosolids
WAC requires 180 days of storage when land application
is prohibited.
Solids may only be applied to agricultural land growing
crops for animal feed.
Solids must me incorporated in soil after application.
Total Coliform count must be below 2,000,000 colony
forming units for land application
Prohibited for use as a soil amendments where exposure
to humans is probable.
4
Background
Agricultural Land Availability
Suitable land is becoming more difficult to
access
Setback distances, slope, nutrient loadings, and
soil type regulation criteria need to be met for
suitable land
Large farms generate large quantities of manure
where additional nutrients from WWTF biosolids
are not needed.
Growth in Village results in generation of more
solids to be disposed of on agricultural land
5
Background
WDNR Interim Strategy
20 ppb threshold
Track and accumulate PFAS loading on soil
Notification requirements
Insurance hard to get
Application rate limit of 1.5 tons/acre if >20 ppb
Village Present Condition
Now at 22 ppb
Arkema has newer pretreatment system
Will help
Well 4 PFAS treatment will help
6
Background
If Land spreading Not An Option In Future
Waste Mgt. Landfill
Do Not Like Cake Biosolids Product, Water
Considering Dryer For Municipal Biosolids
Unknown, Far Into Future
7
Past Activities
Interest in Generating Class A biosolids resulted in pilot
testing:
Different Technology for dewatering equipment
Indirect heat drying equipment.
Class A Biosolids generated from drying offers advantages
Reduction in volume of solids required for disposal
Approximate 80 percent reduction in volume when drying is used
Less stringent restrictions for land application
May be applied to land as a soil amendment where human
exposure is probable.
Milorganite® is an example of Class A Biosolid
15% to 20% reduction in PFAS
8
Past Activities
Wisconsin Dells
Lake Delton-
Dryer installation
visit
Pilot test was
performed with
this manufacturer
9
Planning Study
Biosolids Handling Facilities Modifications Plan
Planning Study in 2025
Flows rates, organic loadings and solids generation
Current planned developments, and SEWRPC
population estimates to 2050 resulted in future
projected flows and loadings less than average
design capacity of WWTF
Identified facilities should be designed to
accommodate WWTF design flows and loadings.
10
Planning Study
Alternative Equipment Evaluation
Dewatering equipment
Two manufacturers were identified that can provide equipment
similar to the equipment pilot tested.
Drying Equipment-Produce Class A Biosolid
Indirect Heat Dryers
Auger
Paddle
Heated Air Dryer
Belt
11
Planning Study
Indirect Heat -Auger
Indirect Heat-Paddle
Heated Air Belt
12
Recommended Plan
Indirect Heat-Auger Dryer with Rotary Press Dewatering Unit
Lowest Capital Cost
Dryer has several installations in Wisconsin
Similar O&M Cost to Indirect Heat- Paddle
Dewatering and Drying Equipment would be installed in existing sludge
storage building
South side would be modified to accommodate new equipment
North side would be used for storage
13
Recommended Plan
14
Recommended Plan
15
Recommended Plan
Other WI Dryer Installations
Lake Delton
Fond du Lac
Waukesha
Reedsburg
River Falls
Beloit
Wausau
LaCrosse
Sheboygan
Stevens Point
Green Bay
Osseo
Marinette
Johnson Creek (in construction)
Keil
Portage
New London
Sun Prairie
16
Recommended Plan
Estimated Capital Cost
$12,562,300
Estimate includes construction
cost, engineering and
contingencies
Estimated Annual O&M Cost
$57,800
Village to Cash Fund Design
of $706,700
Borrow Balance $11,855,
600 with CWFP
17
Next Steps
Submit Facilities Biosolids
Modifications Plan – Biosolids
Drying System to WDNR For
Approval
After WDNR Approval, Village
Approve Design Engineering
and Construction Schedule
Design 2027
Construction 2028 - 2029
18
VILLAGE OF SAUKVILLE
WELL NO. 4 PFAS TREATMENT
Village Board Meeting June 16, 2026
D
ave Arnott
Team Leader / Project Manager, Ruekert & Mielke, Inc.
Topics Covered
Background
Federal and WI Requirements
Test Results For PFAS
Schedule and Costs for Treatment
Task Order
2
Background
Strong carbon-fluorine bonds
Surfactants
Hydrophobic (repels water) and
oleophobic (repels oil, fat, grease)
5,000+ compounds
Properties of hydrocarbon chain
and polar end determine treatment
options
3
Background
Best Producing Well in Village
405 Progress Drive
Dolomite well (shallow)
Open lineshaft vertical turbine well pump, 1000 gpm
Backup generator
Three service pumps
Reservoir
Treatment will improve health for Village
Treatment will help WWTF with biosolids compliance
Drinking water>>wastewater>>treatment>>biosolids.
>>farm field application
4
Federal and State Requirements
WI is Adopting US
E
PA Limits
5
Federal and State Requirements
6
Test Results For PFAS At Well 4
7
Schedule for Treatment System
8
Costs for Treatment System
Village
c
urrently has
$1.1M of PFAS
settlement
money.
9
Task Order
Predesign and
p
ilot study
methodology
10
Source: Village of Saukville website. First collected Oct 8, 2026.