RecordWell Data

May 28, 2026 Fredonia Government Center Commission

Village of Fredonia · Ozaukee County · meeting of May 28, 2026 · Agendas

Open the original document More from Village of Fredonia

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

AGENDA Fredonia Government Center Commission Meeting Thursday, May 28th, 2026 at 2:00PM Fredonia Government Center - Board Room 242 Fredonia Avenue, Fredonia, Wisconsin THE FOLLOWING BUSINESS WILL BE BEFORE THE FREDONIA GOVERNMENT CENTER COMMISSION FOR INITIATION, DISCUSSION, CONSIDERATION, DELIBERATION AND POSSIBLE FORMAL ACTION 1. Call to Order 2. Pledge of Allegiance 3. Public Comments: Please note public comments are limited to five minutes per person 4. Items for Discussion and/or Action: a) Appointment of FGCC Chair b) Review of Intermunicipal Agreement for the Management of Fredonia Government Center c) Update on Facility Condition by Village of Fredonia DPW Director Paulus d) Discussion and Possible Action on Keyless Door Access System e) Discussion and Possible Action on Shared Maintenance Projects f) Discussion and Possible Action on Shared Services 5. Correspondence 6. Items for Future Consideration. 7. Adjournment UPON REASONABLE NOTICE, efforts will be made to accommodate the needs of disabled individuals through appropriate aids and services. For additional information or to request this service, contact the Village Clerk at (262) 692-9125. NOTICE IS HEREBY GIVEN that a majority of the Fredonia Village or Town Board may attend this meeting in order to gather information about a subject over which they have decision- making responsibility. Estimate #1503: – Village of Fredonia Door Access Central Office Systems October 13, 2025 W223N777 Saratoga Drive Waukesha, WI 53186 Phone: 262-228-9966 Client Name: Village of Fredonia Site Location: 242 Fredonia Ave Fredonia WI, 53021 Estimate #1503: – Village of Fredonia Door Access Hi Chris, Thank you for giving us the opportunity to bid on this project for your location. We propose to furnish and install the below equipment. Village Hall Door Access - $10,883.00 ➢ Provide and Install (2) cut-in strike locks (Internal Office Doors) ➢ Provide and install (3) surface mount strike locks (External doors) ➢ Provide and Install (1) Enterprise Access Door hub for network door control ➢ Provide and Install (5) Access card readers ➢ ***Assumes client IT responsible for open POE+ network ports at location*** ➢ Includes Cat 6 network cable, all lines tested / certified ➢ Includes programming & training ➢ Includes 10 keycards and 10 keyfobs Park Restrooms - $2,750.00 ➢ Reinstall existing door handles, remove power from keypads ➢ Provide and install (2) cut-in strike locks ➢ Provide and Install (2) network door controllers ➢ Provide and install (1) 60W POE+ switch for power (to be installed at point of Fire Dept network hookup) ➢ Run network line from Fire Department, to crawlspace above bathrooms, down to doors ➢ Test / certify lines ➢ Includes programming & training Total Estimate (without sales tax): $13,633.00 Estimate #1503: – Village of Fredonia Door Access Notes: ➢ If an IDF Installation is required due to network length / camera location a change order will be provided (not expected) ➢ Any additions (Materials / Network Equipment Needed) outside of this estimate will be added via change order. ➢ 50% down payment required to start the project. The remainder of the estimate, plus any change orders, are due upon completion. ➢ Sales Tax not Included. QUALIFICATIONS: ➢ Prices based on the above counts only & guaranteed for 15 days from date. ➢ Delays caused by situations beyond our control will result in renegotiation of the work schedule/pricing. ➢ Figures based on all areas being available and clear to install during the installation. ➢ All work is to be completed in a professional manner, according to the EIA/TIA standard practices. ➢ All work takes place during regular business hours. Any overtime hours not listed will have to be billed as a separate ticket for hours worked. ➢ All telephone system hardware is provided and installed by others. ➢ Any Demarc extensions would be additional. ➢ All agreements contingent upon strikes, accidents, or delays beyond our control. ➢ COSC will warranty the installation for one full year, from the date of completion. Parts will be covered under manufacture warranty. Labor will be billed T&M unless others caused damage. Service work required because of damage to the installation will be charged on a T&M basis. Submitted by: Accepted by: Thomas Rosecky 10/13/2025 Central Office Systems Authorized Signature Date Client Authorized Signature Date Print Name Title Print Name Title

Source: Village of Fredonia website. First collected Oct 8, 2026.