Packet
Walworth County · Walworth County · meeting of Sep 14, 2026 · Agenda packets
Open the original document More from Walworth County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
September 14, 2026 Public Works Committee Agenda
SEPTEMBER 14, 2026 PUBLIC WORKS AGENDA.PDF
September 14, 2026 Public Works Committee Packet
SEPTEMBER 14, 2026 PUBLIC WORKS PACKET.PDF
1.
Documents:
2.
Documents:
County Board Public Works Committee
MEETING NOTICE
Monday, September 14, 2026
3:30 PM
County Board Room 114
Walworth County Government Center
100 W. Walworth St., Elkhorn, Wisconsin
Dennis Karbowski, Chair Ken Monroe, Vice-Chair
Supervisor Joe Schaefer Supervisor Rick Stacey Supervisor Bud Wojcik
(Posted in compliance with Sec. 19.84 Wis. Stats.)
It is possible that a quorum of the county board or any of its other committees could be in attendance at this
meeting.
Agenda enclosures are available upon request from the County Administrator’s Office or on the County’s
web page (www.co.walworth.wi.us).
A G E N D A
Note: all agenda items are subject to action.
1. Call to order
2. Roll call of committee members
3. Agenda withdrawals, if any
4. Agenda approval
5. Approval of Minutes
a) July 20, 2026, Public Works Committee Meeting (encl. pp. 1-4)
6. Public Comment Period
7. Special Order of Business
a) Appeals/adjustments to the proposed 2027-2031 Capital Improvement Plan
(CIP) (encl. pp. 5-18)
b) Recommendation of the five-year CIP to the Finance Committee (encl. pp. 5-18)
NOTICE: THIS MEETING IS PLANNED TO PROVIDE FOR REMOTE OR OFF -SITE ATTENDANCE
BY COMMITTEE MEMBERS.
THE PUBLIC CAN WATCH THE MEETING STREAMING LIVE: https://bit.ly/2026SeptPW
Individuals wanting to provide a Public Comment can do so remotely by telephone but must contact
the County Administrator’s Office at 262-741-4357 on the day of the meeting and at least 15 minutes
prior to the start of the meeting to obtain instructions.
AGENDA – Walworth County Public Works Committee
Monday, September 14, 2026, at 3:30 PM Page 2 of 2
8. Consent Items
(One motion and second will approve all of the following items. Any item may be
pulled from the list and voted on separately)
a) Reports
1) Director’s Bi-Monthly Report – September 2026 (encl. pp. 19-26)
2) Construction & Project Management Report – September 2026
(encl. pp. 27-31)
3) Report on Highway Commissioner’s Approved Project Change Order Internal
Routing Approval Request for CTH-H (Williams to STH-120) Change Order
#03, Project #240H1 (encl. pp. 32-33)
4) Report on the County Administrator's Approved Waiver of Competition for
purchase of Burke Plow Blades (encl. pp. 34-36)
9. Unfinished Business
a) E-Bike Safety, Regulation, and Policy Recommendations (encl. pp. 37-46)
10. New Business
a) ATV Discussion (Multimodal Use) on White River County Trail (encl. pp. 47-48)
b) Public Works Committee Priorities for Government Center Study (encl. p. 49)
c) Overview of Public Works 2027 Operating Budget (encl. pp. 50-72)
11. Reports/announcements by Chairperson
12. Set/confirm next meeting date and time – Monday, October 19, 2026, at 3:30 p.m.
13. Adjournment
Submitted by: Dennis Karbowski, Committee Chairperson
Richard Hough, Public Works Director
Posted: September 10, 2026
Public Works | W4097 County Road NN | Elkhorn, WI 53121
www.co.walworth.wi.us | (262) 741-3114 (o) | (262) 741-3117 (f)
Memorandum
To: Public Works Committee
Cc: Mark Luberda, County Administrator
From: Richard A. Hough, Public Works Director
Date: September 8, 2026
Re: Sept ember 14, 2026, Public Works Committee Meeting
T
he following is an overview from our Public Works management team concerning items
scheduled for the above -captioned Public Works Committee meeting. Should you have
any questions before this meeting, please do not hesitate to contact either the appropriate
manager or the Director of Public Works.
S
pecial Order of Business
Appeals/adjustments to the Proposed 2027-2031 Capital Improvement Plan (CIP) –
Mark Luberda & Richard Hough
The committee will discuss any submitted appeals or adjustments to the proposed plan.
R
ecommendation of the Five-Year CIP to the Finance Committee – Richard Hough
The Public Works Director will present a detailed breakdown of the CIP processes and
critical supporting plans and answer any project-specific questions from the Committee.
C
onsent Items
O
ne motion and a second will approve all of the following items. Any item may be pulled
from the list and voted on separately.
C
onsent Items – Reports. The following reports are included on the Agenda. No action
is required unless you have questions that may be placed on file.
1) Director’s Bi-Monthly Report – September 2026 – Richard Hough
2) Construction & Project Management Report – September 2026 – Richard Hough
Public Works Director’s Memorandum Page Two
3) R
eport on Highway Commissioner’s Approved Project Change Order Internal
Routing Approval Request for CTH-H (Williams to STH-120) Change Order #03,
Project #240H1 – Richard Hough
4) Report on the County Administrator’s Approved Waiver of Competition for purchase
of Burke Plow Blades – Vijay Narayanan
U
nfinished Business
E-B
ike Safety, Regulation, and Policy Recommendations – Richard Hough
The intent of the discussion is to determine committee guidance on developing internal
strategies for e-bike regulations within the county and to draft a resolution to send to the
Wisconsin Counties Association.
N
ew Business
AT
V Discussion (Multimodal Use) on White River County Trail – Richard Hough
The Director will discuss key aspects of establishing a multimodal trail on state trails.
The committee will discuss the issue and determine whether guidance is needed to
direct staff to pursue these aims.
Pu
blic Works Committee Priorities for Government Center Study – Richard Hough
Director requests that you give consideration to your information priorities during the
Government Center Study. The process will include future committee progress reports
and then a final report. However, consider what your priorities for the study may include.
O
verview of Public Works 2027 Operating Budget – Richard Hough
Public Works will present highlights of its 2027 operating budget to include supporting
goals and objectives.
/sa
DRAFT Walworth County Board of Supervisors
Public Works Committee Meeting Minutes
Monday, July 20, 2026
Walworth County Government Center, County Board Room 114
100 West Walworth Street, Elkhorn, Wisconsin
Chair Dennis Karbowski called the meeting to order at 3:30 p.m.
R
oll call was conducted and the following members were present: Chair Dennis Karbowski;
Vice-Chair Kenneth H. Monroe; Supervisors Joseph H. Schaefer (Remote); Rick Stacey, and
Bud Wojcik. A quorum was declared.
O
thers in Attendance
County Staff: Walworth County Administrator Mark W. Luberda; Director-Public Works Richard
Hough; Undersheriff Tom Hausner; Lt. Jason Rowland; Deputy County Highway Commissioner
Barry Pierce; Director-Asset Management Vijay Narayanan; County Engineer Joe Kroll; Senior
Project Manager Joseph Latocha; Associate County Engineer Nicole Whitman; and Project
Manager Elliot Blascyk
On
motion by Supervisor Stacey, second by Supervisor Wojcik, the agenda was
approved with no withdrawals.
On
motion by Vice-Chair Monroe, second by Supervisor Schaefer, the June 15, 2026
Public Works Committee meeting minutes were approved.
P
ublic Comment – There was none.
C
onsent Items
(One motion and second will approve all of the following items. Any item may be pulled from
the list and voted on separately)
7a
. Summary Specifications & Bid Award Recommendations
1) Bid Award for Sheriff’s Office (SO) Ceiling Tile Replacement, Project #W2135
Supervisor Stacey offered a motion, second by Vice-Chair Monroe, to approve Item 7a.1.
through 7b.7. and pull 7b.1. and 7b.2. Motion carried 5-0.
7
b. Reports
1) Construction & Project Management Report – July 2026
Senior Project Manager Joseph Latocha presented Terracon’s Site Investigation Results and
Remedial Options Evaluation, included on Pages 12-24 of the packet. Terracon was onboarded
earlier this year to evaluate path-forward options, conducting extensive site investigation and
testing. Latocha outlined Terracon's two primary recommendations and reviewed the project's
action plan funding, included on Pages 15-16 of the packet. Director-Public Works Richard
Hough advised the Committee while additional information is required to make a final decision,
supplementary funding may be necessary to move the shooting range project forward.
Discussion ensued. Walworth County Administrator Mark Luberda inquired if the Committee
desired a Memorandum from the Sheriff’s Office detailing project needs, options, and potential
alternatives upon the item's return. The Committee confirmed they request a Memorandum
1 of 72
Walworth County Board of Supervisors
July 20, 2026 Public Works
Committee Meeting Minutes
Page 2 of 4
from the Sheriff’s Office. In addition, Hough provided status and development updates for the
following county projects: County Highway H Project (Lake Geneva), W2213 County Campus
Sewer Project, and W2621 Lakeland Health Care Center Vacant Wing Modification Project.
2) D
irector’s Bi-Monthly Report – July 2026
Hough referenced and provided additional information on the items on his Memorandum,
included on Pages 25-33 of the packet, regarding the Department of Public Works Bi-Monthly
Report – July 2026. The discussion focused on vacancies, new hires, limited-term employees,
use of material and equipment, maintenance, asset management/inventories, updates t
o
p
olicies, plans, training and leadership development, Spring/Summer maintenance season,
and emergency response. Hough highlighted and discussed in detail two working group items,
included on Page 26 of the packet: WG26-01 and WG 25-3.
H
ough referenced and discussed the importance of Chapter 18 of the Walworth County Code
of Ordinances, Civil Emergencies, included on Pages 29-33 of the packet. He highlighted the
ordinance must be amended to legally authorize direct support for out of jurisdiction
assistance. He stated that as of Friday, the estimated and itemized bill for direct support was
$165,000 to aid the Town of Geneva after the July 3 storm. Hough explained that a
commitment needs to be made to go forward with assistance. Luberda explained that the issue
would go to a number of committees including Executive, Public Works and Finance
Committees before an ordinance is amended. He stated that after what the County went
through on July 3
rd and the aftermath, it is clear the issue must be addressed. It must be
addressed to ensure that all actions are consistent with the State’s public purpose doctrine.
Luberda indicated that by working with the Corporation Counsel, a limit could be determined.
He stated he felt comfortable extending work for two days in the middle of an emergency
because the County made a commitment to assist the next week. Luberda stated he needed
two days to investigate to honor the County’s original commitment and figure out his and the
County’s authority. Luberda stated that the agreement with the Chair of the Town of Geneva
will be consistent with the perimeters of a current Memorandum of Understanding (MOU);
even though that specific MOU doesn’t apply to this storm event. Luberda explained that the
County is working on the faith of the two agreements, between Luberda and the Town of
Geneva Board Chair. The expectation is the Town of Geneva will get the 70/30 funding from
the state. He stated the County has to figure out a long term plan. The County has to have
parity on how individual municipalities are treated. Luberda stated that internal work with
Public Works and the Corporation Counsel will be done to determine what the perimeters are
for the County; and to what extent we are allowed legally to assist the municipalities. He
indicated these items will be framed during budget discussions.
3) R
eport on Highway Commissioner Approval of One-Time Cooperative Purchase over
$100,
000 for the Purchase of Road Salt
4) Report on Highway Commissioner Approval of One-Time Cooperative Purchase over
$100,
000 for the Purchase of Bulk Solar Salt
5) Report on the Highway Commissioner’s Approved Bid Award for Concrete Bridge
R
epairs, Project #26-059
2 of 72
Walworth County Board of Supervisors
July 20, 2026 Public Works
Committee Meeting Minutes
Page 3 of 4
6) Department of Natural Resources (DNR) Compliance Maintenance Annual Report
(CMAR) on the County Campus Wastewater Sewage Collection System
7) Report on the County Administrator’s Approved Project Change Order Internal Routing
A
pproval Request for Lakeland Health Care Center (LHCC) Building Renovations,
Change Order #10, Project #W2306
U
nfinished Business
8a. 2027 Budget Ideas or Considerations
Luberda stated Item 8a. is an open-discussion item where Supervisors can propose ideas or
programs that the County Administrator could consider in the development of the 2027
budget. Chair Karbowski stated he wants to ensure we have funds available for the type of
emergency type situation that happened on July 3, 2026. Luberda indicated he did have a
conversation with the Finance Director, and it may be possible to expand the definition of the
emergency fund so that if Public Works has bad weather events; there will be an extra pile of
money that the Finance Committee can free up without having to go to the full County Board
or the need for a two-thirds majority. Hough and Associate County Engineer Nicole Whitman
discussed Supervisor Schaefer’s idea of using solar power for energy and selling solar energy
to local municipalities. They discussed the history of studies done on this issue and the lack of
cost savings being determined.
N
ew Business
9a. Annual Committee Review of Standardized Equipment, Systems, & Materials
Hough referenced and discussed highlights of his supporting Memorandum and the Annual
Committee Review of Standardized Equipment, Systems, & Materials, included on Pages 51-52
of the packet. Supervisor Stacey offered a motion, second by Supervisor Wojcik, to
approve Item 9a. Motion carried 5-0.
9b
. E-Bike Safety, Regulation, and Policy Recommendations
Hough referenced his Memorandum, included on Pages 53-56 of the packet. Hough noted that
E-bikes function like motorcycles but lack registration requirements. He highlighted that
confusion regarding E-bike traffic laws, similar to ATV regulations, makes enforcement difficult.
He stated a message will be relayed to municipalities to establish local rules at this week's
municipal engagement meeting. Chair Karbowski expressed his concern over the lack of
regulations for the use of E-bikes. He discussed his safety concerns and how he would like t
o
s
ee Walworth County become the leading edge on this issue the same way Walworth County
wrote rules for ATV/UTV rules. Chair Karbowski would like to see an ordinance drafted to
reg
ulate E-bikes usage and the ordinance be submitted to the Wisconsin Counties Association
to
help establish statewide consistency. Chair Karbowski offered a motion, second by
Supervisor Wojcik, to request an ordinance be drafted to regulate E-bikes for Walworth
C
ounty to send to the Wisconsin Counties Association (WCA). Motion carried 5-0.
9c
. Approval of One-Time Cooperative Purchase over $100,000 for the Purchase of Sewer
Vacuum Hydro-Excavation and Municipal Pumping Equipment with Related Accessories
and Supplies, Project #26-030
3 of 72
Walworth County Board of Supervisors
July 20, 2026 Public Works
Committee Meeting Minutes
Page 4 of 4
Supervisor Wojcik offered a motion, second by Supervisor Schaefer, to approve Item 9c.,
Approval of One-Time Cooperative Purchase over $100,000 for the Purchase of Sewer
Vacuum Hydro-Excavation and Municipal Pumping Equipment with Related Accessories
and Supplies, Project #26-030. Motion carried 5-0.
9d
. Approval of One-Time Cooperative Purchase over $100,000 for the Purchase of Two (2)
ADA Bariatric Vehicles, Project #W2536
Supervisor Schaefer offered a motion, second by Vice-Chair Monroe, to approve Item
9d., Approval of One-Time Cooperative Purchase over $100,000 for the Purchase of Two
(2) A
DA Bariatric Vehicles, Project #W2536. Motion carried 5-0.
9
e. Project Change Order Internal Routing Approval Request for Radio Tower Site
Construction, Change Order #07, Project #23-027
Vice-Chair Monroe offered a motion, second by Supervisor Wojcik, to approve Item 9e.,
the Project Change Order Internal Routing Approval Request for Radio Tower Site
Construction, Change Order #07, Project #23-027. Motion carried 5-0.
9
f. Res. No. ** - 08/26 Authorizing Budget Amendment Increasing Lakeland Health Care
Center (LHCC) Building Renovation Project with Contingency, LHCC Administrative Area
Carpeting and Paint Project Decrease, LHCC Building Reserves, and Acceptance of
Additional Focus on Energy Credits
Vice-Chair Monroe offered a motion, second by Supervisor Schaefer, to approve Item 9f.,
the resolution Authorizing Budget Amendment Increasing Lakeland Health Care Center
(LHCC) Building Renovation Project with Contingency, LHCC Administrative Area
Carpeting and Paint Project Decrease, LHCC Building Reserves, and Acceptance of
Additional Focus on Energy Credits. Motion carried 5-0.
Reports/Announcements by Chairperson – There were none.
C
onfirmation of next meeting date and time: The next meeting was confirmed for Monday,
September 14, 2026 at 3:30 p.m.
A
djournment
On motion and second by Vice-Chair Monroe and Supervisor Stacey, Chair Karbowski
adjourned the meeting at 4:33 p.m.
_________________________________________________________________________________
Submitted by Kathleen Aukland, Administrative Assistant. Meeting minutes are not considered
final until approved by the Public Works Committee at the next regularly scheduled meeting.
4 of 72
ROLE OF PLANS/PLANNING
PLAN OVERVIEWS
GC PROJECTS
PROJECT OVERVIEW
VEHICLES
PAVEMENT STRATEGY IMPACTS
5-YEAR COMPARISON
5 of 72
10-YR EQUIPMENT PLAN
10-YR ROAD/BRDG PLAN
25-YR ROAD MAINT PLAN
“Plans are nothing; planning is everything.” – Dwight D. Eisenhower
FACILITIES MASTER &
SECURITY PLAN
(2021)
10-YR PAVEMENT PLAN
BLDG STUDIES
BUILDING ASSESSMENTS
(ALL MAJOR FAC.)
Condition Assessment PASER / Bridge Insp. PASER Parking Lot Assessments
FACILITIES
MEP SYSTEMS
LIFECYCLE TRACKER
2025
6 of 72
Scheduled Assessments:
• JC (2003) Building Assessment in 2027 will inform
ne
ar- and long-term capital plans as major
systems, from elevators to generators, enter their
early life-cycle replacement windows.
• SO Kitchen Assessment in 2027 by SMEs will inform
th
e department on the rooms’ deterioration and
mitigation requirements.
• SO (1995) Building Infrastructure Assessment in
20
28 will provide an analysis of major systems as
this building enters its mid-life cycle.
• CDEB (2006) Building Infrastructure Assessment in
20
30 precedes major investments in roofing,
pavement, and HVAC systems.
• HHS (2018) Building Infrastructure Assessment in
20
30 precedes initial review of major systems to
inform MEP and systems placement on future CIPs.
Why and How?
Facilitated by subject matter experts, building
assessments provide a clear understanding of facility
conditions, system performance, and code or safety
issues. They help identify risks, prioritize repairs, and plan
capital investments. Facilities managers use assessments
to forecast maintenance needs, budget accurately, extend
asset life, and align projects with organizational goals. By
relying on objective data, they ensure resources are
allocated effectively, projects are timed appropriately, and
long-term facility strategies remain proactive rather than
reactive. Combining external assessments with employee
observations provides decision-makers with the best
overall picture of what is required versus desired.
BUILDING ASSESSMENTS
& STUDIES
7 of 72
Why and How?
Parking lot and pavement improvement plans are tightly
linked to follow-on maintenance activities that preserve
structural integrity, extend surface life, and reduce
long-term costs. Treatments such as crack filling and
reclamite slow deterioration, protect prior investments,
and maintain safe, functional facilities. Coordinating
capital improvements with routine preservation ensures
predictable performance, supports budgeting accuracy,
and enables DPW to manage lifecycle needs proactively
rather than reactively. This year’s 10-Year Maintenance
Average for all lots is approximately $42K.
PARKING LOTS PLAN
LOT Overall
asphalt ft2
Overall
concrete ft2 Other Total ft2 #
C
e
t
Y
e
a
Current Year 2027 2028 2029 2030
GC 43,511 18,038 900 62,449
S
p
o
Crack Fill Spot Repair / Seal Coat
GC RADIO
TOWER 20,641 1,110 21,751 Seal Coat
HHS 128,706 21,825 150,531 Recla Crack Fill Reclamite
HHS - Overflow 24,650 24,650 PAINT ONLY NO INTENDED MAINTENANCE - too far gone to spend money until Resurfacing
Lot A 74,377 Reclamite Crack Fill
Lot B 46,199
Lot C 9,215
Lot A 124,532 Reclamite Crack Fill
Lot B 32,797 Reclamite Crack Fill
LAKELAND
SCHOOL 176,785 18,245 195,030
R
e
s
Reclamite Crack Fill
Lot A 46,419 a Crack Fill Reclamite
Lot B 72,914
Lot C 70,025
Lot D 40,832 N
O
NO INTENDED MAINTENANCE - too far gone to spend money until Resurfacing
Lot E 20,687 a Crack Fill Reclamite
All the Rest 341,325
Entry Road 38,362 aC Reclamite Crack Fill
SO RANGE* 13,538 4,965 18,503 Recla Crack Fill Reclamite
Lot A 7,376
Lot B 5,684
PRICE PARK 33,000 Seal Coat
PRICE PARK
SERVICE
ROAD**
17,500 Engineering $ Resurface
BURN PIT ROAD 24,000
v
WHITE RIVER
PARK* 22,000 Engineering $
JC 129,791
Reclamite
Spot Repair / Seal Coat
265,405
Crack Fill
C
r
a
c
k
S
o
t
e
Crack Fill
LHCC 157,329
LEC (SO) 250,877
R
e
s
u
r
f
10,212 1,044 141,047
29,576 175 187,080
14,528
NATURELAND
PARK 13,060
R
e
s
u
r
f
Reclamite Crack Fill
Misc
Reclamite
ResurfacingC
I
P
DPW 379,687 29,941 409,628
NO INTENDED MAINTENANCE
NO INTENDED MAINTENANCE
NO INTENDED MAINTENANCE
$1.30/SY
33,000.00$
$10/ft2 (4% inflation)
48,000.00$ 6,000.00$
540,000.00$
6,000.00$ 35,000.00$
4,500.00$ 2,000.00$ 12,000.00$ 6,000.00$ 15,000.00$
Tentative Annual Maintenance Budget for Reclamite, Crackfill & Chip Seal/Spot
Repair/Re-paint
$ based on Cost/ft2 for Seal Coat + Highway re-
paint
49,000.00$ 58,500.00$ 21,000.00$
CrackFill
Slurry Seal Coat
$3,000/day - Highway crew
Will be based on visual inspection
Based on lot size & gallons of paint
4,000.00$ 4,500.00$
Re-Paint
Spot Repair
10,500.00$
3,250.00$
69,250.00$
9,000.00$
20,000.00$
8 of 72
PASER (2025 Bi-Annual Analysis): 6.89
NOTE: The ordinance below defines levels of 7.0
Hot-in-place road treatments recycle existing
pavement to restore ride quality and extend service
life at lower cost. When paired with Highway Safety
Improvement Program funds, agencies can enhance
surface conditions and safety while protecting capital
investments. Integrating these treatments into our
long-range road strategies helps maintain a consistent
30–35-year lifecycle by delaying major reconstruction,
reducing deterioration, and supporting cost-effective,
data-driven pavement management.
RISKS: The plan seeks two competitive federal grants
(STP-Rural) to support 9.4 miles of roadway. One grant
is secured, and the other is pending approval.
HWY PROJECT NAME CL MI PASER + FUNDING 2027 2028 2029 2030 2031
6 Design Yr. 3 Construct
5 $0 $4,467,000
4 Construct
4 $1,206,000
6 Construct
5 $1,666,000
5 Pre-Design Design Construct
4 $25,000 $130,000 $1, 304,000
RE Purchase
$0
Design Yr. 2 Design Yr. 3 Construct
$0 $0 $500,000
RE Acquisition RE Purchase
$40,000 $30,000
6 Design Yr. 1 Design Yr. 2 Construct
4 $238,000 $0 $3,326,000
6 HIR
5 $389,000
5 HIR
5 $156,000
6 HIR
5 $428,000
5 HIR
5 $117,000
4 Pre-Design Design Construct
3 $40,000 $150,000 $1,237,000
5 Design Yr. 1 Design Yr. 2 Design Yr. 3 Construct
3 $326,000 $0 $0 $3,870,000
Design Construct
$75,000 $600,000
Pre-Design Design Construct
$60,000 $309,000 $2,656,000
5 Corridor Study Pre-Design Design Construct
3 $25,000 $30,000 $321,000 $4,315,000
5 Pre-Design Design Construct
3 $15,000 $105,000 $749,000
5 Corridor Study Pre-Design Design
3 $25,000 $30,000 $378,000
Hwy Assessment
$175,000
6 Corridor Study Pre-Design
4 $25,000 $30,000
5 Application Yr SMA Design Yr. 1
3 $573,000
7 Pre-Design
4 $20,000
$4,706,000 $5,462,000 $6,746,000 $7,182,000 $6,065,000
-$237,228 -$225,000 -$225,000
-$236,182 -$240,000 -$240,000
-$696,751 -$690,000 ------>
-$3,304,102 -$3,000,000
-$433,856
$3,535,839 $2,157,898 $5,157,144 $4, 182, 000 $5,600,000
$12,604,685 $12,213,846 $13,265,948 $11,383,804 $10,541,804
FUND BALANCE: $9,068,846 $10,055,948 $8,108,804 $7,201,804 $4,941,804
$4,126,576
STH-67 to STH-50 (3R Req'd)
1.0
CTH-C Salt Box Rd. to Martin St. 1.0
Whitewater Lake Dam - Study
ALL
6.9
(2027-2031) 5-YEAR AVERAGE w/ Inflation:
ESTIMATED CHI-D:
5.2 LRIP
CTH-C State Line Rd to STH-67
CTH-L
VARIOUS Bridge Repairs
N/A
CTH-U to Kenosha Co. LineCTH-B
I-43 to Delavan City Limits
CTH-J to Waukesha Co. Limits
CTH-O
CTH-P (south) to CTH-H
CTH-B Linton Road to STH-120 (3R Req'd)
S. County Line to USH-14 (3R Re q'd)
System-Wide Highway Assessment
LRIP
STP-R
Candidate
PROJECTED TOTALS:
ESTIMATED CHI:
Other-Muni Reimburse / LRIP-S:
(Includes 4% Inflation) TOTAL w/AID:
N/A
3.0
CTH-K
WW DAM
CTH-M to CTH-A (3R Req'd)
PROJECTED FUNDING:
5.9 LRIP-S
1.1
CTH-B Replace V64041, V64042, V64043
N/A
CTH-E
USH-12 to CTH-A 1.7
CTH-J to Waukesha Co. Limits
Stone School Rd
Real Estate - Vision Easements
1.7
1.0
N/AStone School Rd
Real Estate - Vert. Realignment
0.3
0.7 LRIP-S STH-120 to Ausitn St.CTH-G
4.6
CTH-L
CTH-L
CTH-L HSIPN/A
N/A
Stone School Rd
Vertical Realignment
STP-R
Candidate
STH-20 to Racine Co. Line
CTH-DD CTH-JS to CTH-D STP-R4.8
LRIP-S
CTH-A
4.8
CTH-ES
LOCAL PROGRAM - HSIP:
CTH-F
LOCAL PROGRAM - STP:
CTH-P
LRIP-S
CTH-A
LRIP
CTH-I
CTH-B County Line to CTH-C 2.6 LRIP
CTH-H to USH-12
0.4
9 of 72
Why and How?
Road improvement plans and follow-on maintenance
activities are inseparable parts of a long-term pavement
management strategy. Initial reconstruction or resurfacing
establishes structural integrity, while treatments like crack
filling and chip sealing slow deterioration, reduce lifecycle
costs, and extend service life to our desired 30- to 35-year
reconstruction goal. When planned together, they
optimize budgeting, preserve prior investments, and
maintain safe, reliable transportation networks. This
coordinated approach ensures predictable performance,
protects assets, and supports sustainable, data-driven
infrastructure planning. For the Department, we seek to
average $500K in road maintenance costs using this
treatment strategy. This year’s 5-Year Maintenance
Average is approximately $492K. In addition, we’ve been
provided with a new $1M boost to the Highway & Bridge
Fund specific to small culvert repairs after recent
inventories identified 55 structures in poor condition.
HWY From To CL Mile
C
U
R
CURRENT 2027 2028 2029 2030 2031
Rock County Line CTH - P 5.8 R
e Reclamite Crack Fill
CTH - P HWY 67 6.3 C
rCTH - P CTH - H 4.6 Resurface
CTH - H HWY 12 1.7 Resurface
HWY 67 CTH - ES 4.9 Chip Seal Crack Fill
CTH - U Kenosha Cty Line 0.9 HIP Crack Fill
HWY 120 Gregory Dr 6.2 Chip Seal Crack Fill
Gregory Dr Walworth St 0.6 Reclamite Crack Fill
Castle Terrace Linton Rd 2.6 a Crack Fill
Linton Rd HWY 120 5.3 Resurface
CTH - C Rock County Line 2.7
C Resurface Reclamite Crack Fill
HWY 67 CTH - X 5.8
USH 14 USH 14 3.6 Reclamite Crack Fill
N Sharon Limit CTH - X 5.6 R
e Reclamite Crack Fill
State Line HWY 67 1
Salt Box Rd Martin St 1 Resurface
CTH - D CTH - ES County Line 8.5 C
r Chip Seal Crack Fill
CTH - DD CTH - JS CTH - D 5 Resurface Reclamite
CTH - E CTH - J Waukesha County
Line 1 HIP Crack Fill
HWY 12 West St 6.8 Chip Seal Crack Fill
West St HWY 20 2 C
r Reclamite
HWY 12 CTH - A 1.7 Resurface Reclamite Crack Fill
HWY 20 County Line 4.5 Chip Seal Crack Fill
Little - ES HWY 12 CTH - D 4
HWY 67 HWY 50 4.2
HWY 50 HWY 11 2
CTH - G STH 120 Austin St 0.7 Resurface
Elkhorn NN Lake Geneva NN 6.6
Elkhorn CTH - A 4.5 Reclamite Crack Fill
CTH - A HWY 12 4.5 Chip Seal Crack Fill
HWY 12 Jefferson County Line 3.2 Resurface Reclamite Crack Fill
HWY 120 Freeman St (Genoa
City) 6 Reclamite Crack Fill
Williams St HWY 120 0.6 Resurface Reclamite Crack Fill
CTH - I CTH - J Waukesha County
Line 0.25 HIP Crack Fill
CTH - J HWY 20 CTH - ES 10.4 Chip Seal Crack Fill
CTH - JS HWY 11 Racine County Line 1.4 Chip Seal Crack Fill
State Line USH 14 5.9
USH 14 CTH - X 2.5 C Crack Fill
CTH - L STH 20 County Line 4 Resurface
CTH - M HWY 89 CTH - P 5.7 C Crack Fill
CTH - ES HWY 20 1 Chip Seal Crack Fill
HWY 20 CTH - J 1.61300' East of Bray
Road
E County Campus
Limits 1.25 Crack FillE County Campus
Limits CTH - H 6 Chip Seal Crack Fill
HWY 11 CTH - A 5 C
r Chip Seal
CTH - A HWY 12 4.5 Reclamite Crack Fill
Delavan City Limits I43 0.4 HIP Crack Fill
USH 14 I43 3.7 Reclamite Crack Fill
CTH - M CTH - A 6.5 Chip Seal Crack Fill
CTH - A HWY 12 6 Chip Seal Crack Fill
CTH - U CTH - B Kenosha County Line 4.7 C
r Reclamite
CTH - X Delavan County Line 5.3 Reclamite Crack Fill
3.7 8.7 16.1 14.9 4.4 11.7
84,656.00$ 199, 056.00$ 368, 368.00$ 340, 912.00$ 100, 672.00$ 267,696.00$
10.8 23.45 27.15 34 22.5 11.2
$ 21,600.00 $ 46,900.00 $ 54,300.00 $ 68,000.00 $ 45,000.00 $ 22,400.00
18.5 15.9 17.9 7.6 6.8 5
$ 314,500.00 $ 270,300.00 $ 304,300.00 $ 129,200.00 $ 115,600.00 $ 85,000.00
# 2026 2027 2028 2029 2030 2031
33 48.05 61.15 56.5 33.7 27.9
Assumptions:
CTH - B
CTH - A
CTH - N
- again at year 10 of cycle
$ 375,096.00 $ 516,256.00 $ 726,968.00
CTH - K
$ 261,272.00
***NEED TO INCLUDE THE JAIL TRAIL IN
THIS PLAN***
CTH - C
CTH - ES
CTH - H
$ 538,112.00
CTH - P
CTH - NN
CTH - O
CTH - F
Reclamite
Chip Seal
CrackFill
$ 420,756.00 Tentative Annaul Maintenance Budget for
Rejuvenation Treatments, Chip Seal & Crackfill
Annual Avg 17k/CL Mile**
Annual Avg 2k/CL Mile
$1.30/SY
Total Maintenance Mileage
Reclamite is the first treatment in the
rejuvenation process - ideal at year 3 of life
10-YR PAVEMENT PLAN
10 of 72
11 of 72
DEPT DESCRIPTION YEAR(S) TOTAL BUDGET NOTE:
DPW JC Renovations 2029
2030
$600,000 (D)
$5,000,000 (C)
Remodel the Judicial Center to allow for better utilization of building space due
to division relocations within the building and the relocation of courtrooms.
DPW JC Window
Renovations
2030
2031
$75,000 (D)
$1,000,000 (C)
Exterior insulated windows are original (2004) and nearing their estimated
service life of 25 years.
DPW JC Elevator
Renovations
2029
2030-31
$60,000 (D)
$1,700,000 (C)
Planned rehabilitation or replacement is needed to ensure ongoing business
operations and meet code compliance requirements for the public facility.
Planned as 2 units per year, with design in the prior year.
SO 911 Comms Center 2028
2029
$800,000 (D)
$7,200,000 (C)
Whitewater, UWW , and City of Lake Geneva could consolidate dispatch to the
county per county ord. 2-193. Add'l communications officers & support staff
will also be needed. Recommend a multipurpose facility to address SO/ME
requirements.
SO LE Center Remodel 2028
2029
180,000 (D)
$1,800,000 (C)
LEC remodel as a result of the organizational, 911, and Law Enforcement Center
building studies. Project includes refurbishing employee locker/toilet room,
admin area flooring replacements, patrol office remodel, and kitchen
infrastructure repairs.
SO Property Barn
Expansion
2029
2030
$150,000 (D)
$1,500,000 (C)
Expand the property storage warehouse for SO's equipment.
CDEB Corridor Flooring 2028
2029
$55,000 (D)
$1,500,000 (C)
Replace the original 2008 patterned corridor tiling with a new flooring solution.
Current stockage for repairs and replacements is minimal.
12 of 72
DEPT DESCRIPTION YEAR(S) TOTAL BUDGET NOTE:
LHCC Vacant Wing
Modification
2027 $4,000,000 (D&C) Awaiting notification on a $1M CDS grant which is likely to be formalized later
this month.
LHCC North Parking Lot 2027 $1,000,000 (D&C) Lot deteriorating at rapid rate and requires rebuilding base material
LHCC Exterior Siding 2029
2030
2031
$50,000
$250,000
$2,000,000
Residing facility at approximate life-cycle of windows and siding. Assessment in
2029 will validate scope of work required.
DPW DPW Parking Lot
Replacement
2028
2029
$600,000
$5,400,000
Public Works parking lot is in poor to fair condition. Project will also address
the access road on the east side of the compound.
DPW Cold Storage
Facility
2028
2029
$100,000
$1,300,000
Demolition of smaller huts and construction of a larger facility to bring most of
the departments’ vehicles under a shelter to facility life-cycle objectives.
13 of 72
DEPT DESCRIPTION YEAR(S) TOTAL BUDGET NOTE:
DPW JC Heating Boiler
Replacement
2027
2028
$60,000 (D)
$850,000 (C)
NOTE: JC is entering a significant systems transition period for the next several
years as major system reach initial life-cycles.
SO Jail Dorms H&L
Mech. Upgrades
2028
2029
$70,000 (D)
$1,000,000 (C)
Original 2002 Huber dorms chiller, boiler, boiler pumps, and hot water system
replacement.
CDEB Chiller and Partial
Roof Replacement
2027 $765,000 (C) Replace the chiller system at the end of its life (20 years). Replace kitchen
cooler and freezer evaporators and condensers at the end of life (20 years).
LHCC Chiller
Replacement
2027
2028
$50,000 (D)
$500,000 (C)
Chillers (2006 Trane; 2012 Daikin) are approaching or have exceeded their
service life (estimated at 15 years). Replace both units with one (1) multi-stage
chiller unit sized to meet the building specifications.
DPW VMF HVAC Equip.
Upgrade
2030
2031
$40,000 (D)
$500,000 (C)
Approximate replacement window based on anticipated system life-cycles.
NOTE: VMF entering its initial window of life-cycle repairs
14 of 72
DEPT DESCRIPTION YEAR(S) TOTAL
BUDGET
NOTE:
DPW Tandem Axle
Patrol Truck
Replacements
2027
2028
2029
2030
2031
$528,500
$1,710,000
$1,217,500
$1,298,000
$473,000
Replacement cycle is 1, 3, 2, 2, and 1. NOTE: All primary plows will be equipment
with multi-generational brine tank inserts by 2030 resulting in lower future costs
for new plow trucks.
DPW Grader 2027 $240,000 Grader will be smaller than existing vehicle as the department seeks to field
mission appropriate equipment while lower overall life-cycle costs
DPW Excavator
Replacement
2030 $540,300 Replacement of excavator based on Highway Equipment Plan or approximately
20 years of service life.
15 of 72
16 of 72
Year Previous $ Current $ Difference MAJOR CHANGES Budget
2027 $15,415,430 $19,497,030 $4,081,600 CDEB Chiller & Partial Roof Rep Moved Up
911 Communications Center
$765,000
($800,000)
2028 $29,354,990 $27,327,190 ($2,027,800) GC Remodel
CDEB Chiller & Partial Roof Rep Moved Up
911 Communications Center
$5,225,000
($765,000)
$800,000
($7,200,000)
2029 $16,720,388 $34,568,068 $17,847,680 911 Communications Center
West Playground Replacement
DPW Parking Lot (Moved Up)
Increase Dorm Remodel Costs
Property Barn Expansion
$7,200,000
$635,000
$5,400,000
$500,000
$1,500,000
2030 $26,415,464 $24,401,604 ($2,013,860) Deleted Loader Request ($356,200)
2031 $14,956,391 $15,477,191 $520,800 Reduced LHCC Window Budget ($2,000,000)
17 of 72
For road infrastructure projects, we've used a
4% inflation factor, while we’ve calculated
vehicles at 3%. For rebidding lapsing contracts
at 3–6 years, we've generally applied an
inflation factor of 10% to 20%. For all other
categories and for many previously scheduled
CIPs, especially where material requirements
are significant, we've used approximately 6%.
18 of 72
Public Works | W4097 County Road NN | Elkhorn, WI 53121
www.co.walworth.wi.us | (2 62) 741-3114 (o) | (262) 741-3117 (f)
M
emorandum
To: Public Works Committee Members
Cc: Walworth County Administrator – Mark Luberda
From: Public Works Director – Richard Hough
Date: September 6, 2026
Re: Department of Public Works Bi-Monthly Report – September 2026
Thi
s correspondence provides a bi-monthly update on multifaceted topics related to the
Department of Public Works.
Human Resources
Topic What When Remarks
New Hires (FTE) 1 / 1 1 Groundskeeper / 1 Intern
FTE Vacancies 2 January 1 Electrician; 1 Hightway
# of LTEs (OH) PARKS: 5 September
Remarks: Department has a separating U.S. Navy Skillsbridge® program member through mid-
January.
Material & Equipment
Prior Year Fuel Comparison (Qtr) Diesel (1,118); Unleaded 239
Pending Procurements (CIP) Lift Controls, Tire Balancing Machine, DPW Garage
Doors
Surplus / Disposed Equipment
Remarks: Delivery of 2800 tons of solar salt. The department sustained reduced diesel fuel use
over the same quarter as the prior year.
Ma
intenance
Recent PMCS Activities 1 September
Critical Equipment Deadline N/A
Remarks: The fleet maintenance program is about two weeks behind schedule but is
expected to catch up next month.
19 of 72
Subject: Bi-Monthly PW Report
Asset Management / Inventories
WHAT WHEN REMARKS
VMF Parts SEPT
NCA Highway Maintenance Worker's
Tool Cabinets
OCT
Handheld Portable Radios OCT
Capital Asset Inventory (Fleet, Radios,
Equipment)
OCT/NOV Year-end capital inventory
P
olicy & Doctrine (+/- Two Month Window)
Level Topic Remark Effective
Internal Traffic Operations Policy Three-Year Review Complete
Internal Strategic Asset Management Plan Three-Year Review Complete
Internal Misdirected Emergency Calls Policy New Complete
Internal Department Safety Program Three-Year Review Pending
Internal Facilities Security Assessment Policy Three-Year Review Pending
Internal Leadership Development & Supervisory
Training
Three-Year Review Pending
Internal Highway Asset Management (Signs) Three-Year Review Pending
Internal WISLR Utilization Policy Three-Year Review Pending
Internal Capital Asset Management Three-Year Review Pending
Internal Consumable Supplies Policy Three-Year Review Pending
Internal Office Supply Policy Three-Year Review Pending
P
lans, Training & Leadership Development (+/- Two Month Window)
Category Title Who When Remarks
WG 26-01 Parks & Open
Space Plan
Rich Hough Jan 26 –
Jan 27
Municipal and Conservation
Group Outreach Updates
(Ongoing)
WG 25-1 AssetWorks WG Sarah Arndt Sep 25 –
Sep 26
Moving to a quarterly
meeting; focus shifting to GIS
integrations.
WG 25-2 Key Performance
Indicator
Development
Rich Hough Sep 25 –
Sept 26
Developing KPIs to outline
operational performance in
the resource requirements to
sustain
WG 25-3 COOP/COG
Update
Rich Hough Sep 25 –
Jan 27
Develop five department
contingency plans
20 of 72
Subject: Bi-Monthly PW Report
Spring/Summer Maintenance Season
Maintenance Item Planned Completed
Crackfill C/L Miles – State 103 75.7**
Crackfill C/L Miles - County 47 28.4
Chip Seal Miles 18.9 18.9
Bridge Maintenance Items - State 36 21
**Bridge Maintenance Items - County 6 -
Ditch Maintenance - County Odd Years
Roadside Mowing Planned Completed
*State Routes 13 6 (1205 Hours)
County Routes - 1st run 10 10 (657 Hours)
County Routes - 2nd run 10 -
*Owing to vision issues, this will occur moving forward as we determine how the spraying affected State ROW
growth. Meanwhile, the complete route estimate is based on vision mowing that has occurred.
**DMA Work
(IN
TENTIONALLY LEFT BLANK)
21 of 72
Subject: Bi-Monthly PW Report
Complaint / Notification Log
Date Received Last Name Fir st Name Address (if known) Residency (Associated
Township) Nature of Complaint Forwarded to Act ions We Took
2-Jun-26 Blise Barb To wn of East Troy STH-120- large holes, pieces of concrete laying
on 120 when turing S from Honey Creek Rd
D Woodhouse
15-Jun-26 Alan 966 Mai n St Village of Genoa City tree fell in his driveway. He was told last year it
is in our ROW. After looking at GIS, that will be
looke
d at again tomorrow to determine who is
responsible.
D Woodhouse Dale is on vacation, Woody
looking at this. Completed
6/16
15-Jun-26 Amanda 8690 Ber onja Rd/CTH-L Town of East Troy Tree fell from across the road from Beronja in
April. Our trucks cleaned it up and left big ruts
in Be
ronga ditch.
D Woodhouse Dale is on vacation, Woody
looking at this. Completed
6/16
15-Jun-26 Carmen 4130 CTH -ES Town of LaFayette fix mailbox from winter hit. D Poggensee Dale is on vacation, Woody
looking at this. Completed
6/16
15-Jun-26 Garwood Mary corner of Sweet Rd/CTH-
K
Town of Darien vision issue, Sweet Rd/CTH-K - tree fell from
storm
D Woodhouse D Woodhoiuse took care of
issues 6/16
15-Jun-26 Struck Ken Li nton airport Town of Linn CTH-B culvert D Woodhouse ends cleaned and inspected.
6/16
16-Jun-26 Weber Aman da N1751 N Daisy Dr Town of Bloomfield her back yard butts up to US12. In 2025 a
vehicle went through the fence. Would like the
fen
ce fixed 262-206-4177
D Woodhouse 6/18 fence is repaired
7-Jul-26 Michael N7048 CT H-DD we have filed hole before, continues to open up
when it rains. Needs something done to fix it
Rec
ently, person went into the ditch. Got out of
car and fell into the hole, did sustain injury.
D Poggensee
7-Jul-26 Harvey STH-20/CTH-ES tree limb from Oak Ridge
cemetary fell ito our ROW. Look to make sure
it'
s ours. 262-642-2526
D Woodhouse do after Como is done, need
excavator to move limb
7-Jul-26 Nelson Stev e W4801 CTH-ES Town of LaFayette When road work was done, tree roots where hit
and now tree is dying. Limb in our ROW
D Poggensee cleaned up limb. Not our tree
14-Jul-26 voicemail, no
name
CTH-H - sink hole between CTH-A and Voss
Rd. Was filled in a few months ago but has
reope
ned.
D Poggensee 7/15 filled
20-Jul-26 Mary N1087
Cobblestone/CTH-B
Town of Walworth tree on B side of house. Dead oak ready to fall.
Ours or hers to cut down? 707-330-5854
D Poggensee not our tree 7/21
22-Jul-26 Tony N716 Br ink Rd/CTH-B Town of Linn driveway is on CTH-B. Approx 1/8 mile E of
intersection is driveway. Our mower mowed
over t
he apron and hit culvert. Would like it
fixed so it doesn't continue to get hit and get
worse.
D Poggensee
22-Jul-26 Schmidt Alyc e W303 CTH-JS Town of Spring Prairie Johnson Sand & Gravel turns around in her
driveway every week with street sweeper, has
rui
ned her driveway and road. Look at to see
what needs to be fixed, what's damaged.
D Poggensee gravel driveway. Road edges
fixed with cold patch. Dale
cont
acted Johnson Sand and
asked to have sweeper person
turn around in another
location.
22-Jul-26 Town of Geneva vis ion issue at CTH-H/Pinecrest Ln D Poggensee mowed 7/23
29-Jul-26 Bridgett 4106 Mapl e Dr Town of Delavan side of her home runs along CTH-O. Tree is
leaning along O, believes it is our ROW
D Poggensee Per Dale, not our tree to take
care of.
30-Jul-26 Justin N2804 ST H-67 Town of Delavan ditch vision issues at adress D Woodhouse
5-Aug-26 Vickie Gla dhurst Subdivision Town of LaGrange 12/67 and Gladhurst Ln - sink hole on west side
of road
D Woodhouse
7-Aug-26 Helen CTH -P, south Town of Darien corner of CTH-P/M vision issue, corn is
blocking vision
D Poggensee Per Dale, no vision issue.
Drivers must square up to
sto
p sign and they can see.
11-Aug-26 Ken W1529 CT H-B Town of Bloomfield branches have fallen. tree may be dead, his or
ours to cut? 773-251-9331
D Poggensee
13-Aug-26 Smyth Tom 1407 St ate St City of Delavan Why are we putting gravel over CTH-O instead
of repaving it? Why woiuld we turn it into a
gra
vel road?
B Pierce Responded to Tom - We are
chipsealing, not turinging it
int
o a gravel road.
14-Aug-26 Levy Kim W3148 S pringfield Rd Town of Geneva We are chipsealing - multiple trucks used her
newly fixed drivway to back in and turnaround.
Pict
ures were sent. Wants driveway fixed
D Poggensee fixed driveway 8/18
17-Aug-26 Travis Eil een N1910 CTH-K Town of Sharon they are cutting trees in their yard, several are
dead and they didn't realize it. Several are
leavi
ng toward the road. Are the ones leaning
ours or hers?
D Poggensee Not our tree 8/18
25-Aug-26 Marino Mark 390 C TH-B Village of Fontana ditch has not been mowed yet. When is it being
done? Normally done by now
D Poggensee
22 of 72
Department Available Budget-Operating Budget Only*
550 Fund
2026 August 14, 2026
Operating Budget Activity Revised Budget Actuals Encumbered Available Available %
Expense* Highway Administration 734,682.00$ 432, 275.18$ 152. 65$ 302, 254.17$ 41. 14%
Highway Supervision 673,600.00$ 374,127.70$ -$ 299, 472.30$ 44. 46%
Fleet Operations 483,934.00$ 221,314.34$ 110. 85$ 262, 508.81$ 54. 24%
Field Small Tools 49,375.00$ 20,229.72$ 4, 709.56$ 24, 435.72$ 49. 49%
Brine Operations 159,210.00$ 49,817.03$ -$ 109, 392.97$ 68. 71%
Fuel Handling 31,632.00$ 19,992.68$ -$ 11, 639.32$ 36. 80%
Machinery & Equipment 2,395,350.00$ 1,197,487.29$ -$ 1, 197,862.71$ 50. 01%
Fleet Staff Payroll 867,410.00$ 466,146.81$ -$ 401, 263.19$ 46. 26%
Salt Sheds 43,933.00$ 30,376.37$ -$ 13, 556.63$ 30. 86%
DPW Building Complex 622,023.00$ 193,601.21$ 20, 775.98$ 407, 645.81$ 65. 54%
Vehicle Maintenance Facility 189,668.00$ 101,021.87$ 5, 854.75$ 82, 791.38$ 43. 65%
Projects 5545-5540 300.00$ -$ -$ 300. 00$ 100. 00%
Highway Staff Payroll 3,936,188.00$ 2,300,356.41$ -$ 1, 635,831.59$ 41. 56%
State Routine Maintenance 1,347,525.00$ 796,769.49$ -$ 550, 755.51$ 40. 87%
State Winter Maintenance 1,187,398.00$ 763,530.61$ -$ 423, 867.39$ 35. 70%
State Damage Claims 155,629.00$ 60,780.61$ -$ 94, 848.39$ 60. 95%
State Special Projects 658,917.00$ 224,069.66$ 113, 668.00$ 321, 179.34$ 48. 74%
Highway General Maintenance 2,118,613.00$ 837,044.11$ 32, 257.82$ 1, 249,311.07$ 58. 97%
Highway Winter Maintenance 1,675,050.00$ 619,016.90$ -$ 1, 056,033.10$ 63. 04%
Highway Marking/Signage 385,040.00$ 220,362.45$ -$ 164, 677.55$ 42. 77%
County Damage Claims 40,605.00$ 4,812.96$ -$ 35, 792.04$ 88. 15%
Other Municipality Sales/Work 492,223.00$ 271,870.10$ 20, 800.00$ 199, 552.90$ 40. 54%
Solid Waste Program 178,984.00$ 78,121.28$ 19. 21$ 100, 843.51$ 56. 34%
Expense Total 18,427,289.00$ 9,283,124.78$ 198, 348.82$ 8, 945,815.40$ 48. 55%
*Values exclude 58210 Capital Outlay Offset, Cost Pool Offsets and Depreciation Expense
Revenue Highway Administration 199,979.00$ 144, 639.26$ -$ 55, 339.74$ 27. 67%
Highway Supervision 265,100.00$ 179,228.55$ -$ 85, 871.45$ 32. 39%
Fleet Operations 5,000.00$ 2,939.27$ -$ 2, 060.73$ 41. 21%
Field Small Tools -$ -$ -$ -$ 0.00%
Brine Operations -$ -$ -$ -$ 0.00%
Fuel Handling 141,455.00$ 100,059.23$ -$ 41, 395.77$ 29. 26%
Machinery & Equipment 57,000.00$ 71,549.26$ -$ ( 14,549.26)$ - 25.53%
Fleet Staff Payroll -$ -$ -$ -$ 0.00%
Salt Sheds 15,500.00$ 16,534.12$ -$ ( 1,034.12)$ - 6.67%
DPW Building Complex 168,500.00$ 168,501.15$ -$ ( 1.15)$ 0. 00%
Vehicle Maintenance Facility -$ -$ -$ -$ 0.00%
Projects 5545-5540 379,760.00$ 278,598.77$ -$ 101, 161.23$ 26. 64%
Highway Staff Payroll -$ -$ -$ -$ 0.00%
State Routine Maintenance 1,347,525.00$ 791,019.54$ -$ 556, 505.46$ 41. 30%
State Winter Maintenance 1,187,398.00$ 763,530.61$ -$ 423, 867.39$ 35. 70%
State Damage Claims 155,629.00$ 58,895.98$ -$ 96, 733.02$ 62. 16%
State Special Projects 658,917.00$ 224,069.66$ -$ 434, 847.34$ 65. 99%
Highway General Maintenance 2,580,500.00$ 2,001,241.13$ -$ 579, 258.87$ 22. 45%
Highway Winter Maintenance -$ 3,292.10$ -$ ( 3,292.10)$ 0. 00%
Highway Marking/Signage -$ -$ -$ -$ 0.00%
County Damage Claims 40,605.00$ 4,812.96$ -$ 35, 792.04$ 88. 15%
Other Municipality Sales/Work 492,223.00$ 271,870.10$ -$ 220, 352.90$ 44. 77%
Solid Waste Program 115,147.00$ 50,871.80$ -$ 64, 275.20$ 55. 82%
Revenue Total 7,810,238.00$ 5,131,653.49$ -$ 2, 678,584.51$ 34. 30%
6,267,230.89$
23 of 72
Cost Pool Offset Totals Revised Budget Actuals Encumbered Available Available %
Fleet Overhead (377,900.00)$ (263,387.24)$ -$ (114,512.76)$ 30.30%
Field Small Tools Offset (46,976.00)$ (22,956.43)$ -$ (24,019.57)$ 51.13%
Brine Offset (195,600.00)$ (89,645.92)$ -$ (105,954.08)$ 54.17%
Equipment Offset (2,014,050.00)$ (1,301,898.82)$ -$ (712,151.18)$ 35.36%
Buildings & Grounds Offset (1,064,700.00)$ -$ -$ (1,064,700.00)$ 100.00%
Labor & Fringe Offset (4,897,444.00)$ (2,550,282.98)$ -$ (2,347,161.02)$ 47.93%
Offset Total (8,596,670.00)$ (4,228,171.39)$ -$ ( 4,368,498.61)$ 50. 82%
Projects-Expense Only Revised Budget Actuals Encumbered Available Available %
W2639 VMF TIRE BALANCING MACHINE 25,000.00$ -$ -$ 25, 000.00$ 100. 00%
W2129 FUELING SYSTEM REPLACEMEN 1,257.86$ 1, 257.86$ -$ -$ 0.00%
W2634 DPW GARAGE DOORS REPLACEMENT 80,000.00$ 53. 50$ -$ 79, 946.50$ 99. 93%
W2526 DPW ADMIN BLDG EXTERIOR REPAIR 70,766.53$ 56, 827.90$ 9, 037.81$ 4, 900.82$ 6. 93%
W2636 DPW LIFT STATION CONTROLS 70,000.00$ -$ -$ 70, 000.00$ 100. 00%
W2635 VMF HOIST LIFT CONTROL CONSOLE 80,000.00$ -$ 62, 462.78$ 17, 537.22$ 21. 92%
W2638 VMF BUILDING INFRASTRUCTURE 35,000.00$ -$ -$ 35, 000.00$ 100. 00%
W2523 PAINT TRUCK REPLACEMENT 749,983.00$ 22. 00$ -$ 749, 961.00$ 100. 00%
W2524 TANDEM AXLE PATROL TRUCK (1) 526,500.00$ 477, 908.41$ -$ 48, 591.59$ 9. 23%
W2527 ONE-TON PATROL TRUCK (2) 58,980.00$ 57, 156.00$ -$ 1, 824.00$ 3. 09%
W2528 LOWBOY TRAILER REPLACEMENT 139,999.23$ 133, 244.73$ -$ 6, 754.50$ 4. 82%
W2630 TANDEM AXLE PATROL TRUCK 540,000.00$ -$ 498, 887.94$ 41, 112.06$ 7. 61%
W2631 TRACTOR REPLACEMENTS 172,000.00$ -$ 167, 362.64$ 4, 637.36$ 2. 70%
W2632 TRAILER MOUNTED SEWER JETTER 115,000.00$ -$ 107, 729.88$ 7, 270.12$ 6. 32%
W2633 PATROL TRUCK REPLACEMENT (1) 99,500.00$ 54, 181.48$ 29, 387.00$ 15, 931.52$ 16. 01%
W2647 VOLVO PURCHASE 290,000.00$ 271, 650.00$ -$ 18, 350.00$ 6. 33%
W2637 SUPERINTENDENT VEHICLE REPLACE 62,200.00$ -$ 47, 981.50$ 14, 218.50$ 22. 86%
W2318 BRIDGE REPAIRS 26,564.00$ -$ 26, 564.00$ -$ 0.00%
W2422 BRIDGE AND DAM REPAIRS 155,006.00$ 106. 00$ 134, 086.00$ 20, 814.00$ 13. 43%
I2313 FLEET DATA TRACKING SYSTEM 2,226.00$ 2, 226.00$ -$ -$ 0.00%
Project Total 3,299,982.62$ 1,054,633.88$ 1, 083,499.55$ 1, 161,849.19$ 35. 21%
24 of 72
Department Available Budget-Operating Budget Only*
Facilities
2026 August 14, 2026
Operating Budget Activity Revised Budget Actuals Encumbered Available Available %
Expense* SO Administration $496,995.50 223,230.48$ 46, 016.08$ 227, 748.94$ 45. 83%
SO Range 81,170.00$ 27,396.55$ 15, 561.00$ 38, 212.45$ 47. 08%
SO Jail 1,073,122.50$ 528,668.61$ $56, 201.02 488,252.87$ 45. 50%
Facilities Administration 1,637,548.00$ 872,739.95$ 64, 142.26$ 700, 665.79$ 42. 79%
Facility Machinery & Equipment 149,650.00$ 86,033.75$ -$ 63, 616.25$ 42. 51%
Facility Maintenance Staff Payroll* 1,530,785.00$ 836,812.96$ -$ 693, 972.04$ 45. 33%
Government Center & Veteran's Park 494,715.00$ 237,408.88$ 39, 466.52$ 217, 839.60$ 44. 03%
Judicial Center 693,614.00$ 328,336.55$ 70, 801.36$ 294, 476.09$ 42. 46%
Webster House 20,740.00$ 12,352.41$ -$ 8, 387.59$ 40.44%
River Rail Transit Commission 30,000.00$ 30,000.00$ -$ -$ 0.00%
County Complex 85,555.00$ 13,821.01$ -$ 71, 733.99$ 83. 85%
Health & Human Services 388,910.00$ 181,769.97$ 44, 887.53$ 162, 252.50$ 41. 72%
Lakeland School (CDEB) 841,519.00$ 383,882.83$ 129, 356.17$ 328, 280.00$ 39. 01%
Lakeland Health Care Center* 1,179,874.00$ 616,917.35$ 154, 590.53$ 408, 366.12$ 34. 61%
Expense Total 8,704,198.00$ 4,379,371.30$ 621, 022.47$ 3, 703,804.23$ 42. 55%
*Excludes 58210 Capital Outlay Offset, labor & fringe offset 51405/51410 or Depreciation Expense
Revised Budget Actuals Encumbered Available Available %
Revenue SO Administration -$ -$ -$ -$ 0.00%
SO Range -$ -$ -$ -$ 0.00%
SO Jail -$ -$ -$ -$ 0.00%
Facilities Administration 400.00$ 458.13$ -$ (58. 13)$ -14.53%
Facility Machinery & Equipment -$ -$ -$ -$ 0.00%
Facility Maintenance Staff Payroll -$ -$ -$ -$ 0.00%
Government Center & Veteran's Park 1,640.00$ 37.43$ -$ 1, 602.57$ 97.72%
Judicial Center 2,000.00$ 1,049.41$ -$ 950. 59$ 47.53%
Webster House -$ -$ -$ -$ 0.00%
River Rail Transit Commission -$ -$ -$ -$ 0.00%
County Complex 175,650.00$ 88,250.00$ -$ 87, 400.00$ 49. 76%
Health & Human Services -$ -$ -$ -$ 0.00%
Lakeland School (CDEB) 9,890.00$ 9,890.00$ -$ -$ 0.00%
Lakeland Health Care Center -$ 224.41$ -$ (224. 41)$ 0.00%
Revenue Total 189,580.00$ 99,909.38$ -$ 89, 670.62$ 47. 30%
Projects-Expense Only Revised Budget Actuals Encumbered Available Available %
W2135 SO CEILING TILE REPLACEMENT 346,087.00$ 57. 70$ -$ 346, 029.30$ 99. 98%
W2435 SO EMPLOYEE COURTYARD RENOVATION 14,137.00$ 693. 75$ -$ 13, 443.25$ 95. 09%
W2245 SO MARKED SQUAD REPLACEMENT 133,301.02$ -$ 46,394.02$ 86, 907.00$ 65. 20%
W2331 SO SQUAD REPLACEMENT 143,366.36$ 152. 50$ -$ 143, 213.86$ 99. 89%
W2429 SO SQUAD REPLACEMENT PURCHASE (10) 840,000.00$ 789, 614.22$ 36, 400.56$ 13, 985.22$ 1. 66%
W2406 SO DEPUTY-ASSIGNED SQUAD PROGRAM 340,000.00$ 239, 918.81$ 99, 153.80$ 927. 39$ 0.27%
W2532 SO SQUAD REPLACEMENT PURCHASE (10) 830,000.00$ -$ -$ 830, 000.00$ 100. 00%
W2540 SO REPLACEMENT SQUADS (2) 60,474.00$ 59, 232.77$ -$ 1, 241.23$ 2.05%
W2617 SO SQUAD REPLACEMENT PURCHASE (10) 910,000.00$ -$ -$ 910, 000.00$ 100. 00%
W2430 JAIL TRANSFER SWITCH 93,411.12$ 83, 625.00$ -$ 9, 786.12$ 10.48%
W2533 JAIL PROPER HARDENING 107,938.00$ 8, 887.28$ 85, 107.05$ 13, 943.67$ 12. 92%
W2640 JAIL WASHER & DRYER REPLACEMENT 55,000.00$ -$ -$ 55, 000.00$ 100. 00%
W2641 JAIL TRASH COMPACTOR/DUMPSTER 56,500.00$ 27, 223.09$ 27, 223.10$ 2, 053.81$ 3.64%
W2642 SO KITCHEN WORKTABLE REPLACEMENT 44,000.00$ 4, 989.90$ 33, 812.00$ 5, 198.10$ 11.81%
W2643 JAIL FLOORING REPLACEMENT 40,000.00$ -$ 20,818.00$ 19, 182.00$ 47. 96%
W2049 SO EXTERIOR MAINT/ENERGY 279,077.50$ 59, 495.27$ 107, 687.05$ 111, 895.18$ 40. 09%
W2402 SO BOILER SYSTEM REPLACEMENT 704,161.95$ 372, 356.00$ 272, 363.45$ 59, 442.50$ 8. 44%
W2404 SO HEATER UNIT REPLACEMENTS 298,450.25$ 116, 085.75$ 143, 345.00$ 39, 019.50$ 13. 07%
W2431 SO HOT WATER BOILER SYSTEM 23,958.34$ 18, 502.90$ 2, 095.44$ 3,360.00$ 14.02%
W2440 SO LIGHTNING ROD INSTALL UPGRADE 82,977.50$ 57, 240.00$ 6, 348.00$ 19,389.50$ 23. 37%
W2443 JAIL LOCK REPLACEMENTS 1,885.69$ 1,885.02$ -$ 0. 67$ 0.04%
W2605 SO GARAGE HEATER REPLACEMENT 65,000.00$ 19. 90$ 24,995.00$ 39, 985.10$ 61. 52%
W2606 SO TUBE SYSTEM REPLACEMENT 52,000.00$ -$ -$ 52, 000.00$ 100. 00%
W2607 SO HUBER EXTERIOR WALL REPLACEMENT 31,500.00$ -$ -$ 31, 500.00$ 100. 00%
W2608 SO OUTDOOR RANGE IMPROVEMENT 745,000.00$ 9, 840.00$ 28, 900.00$ 706, 260.00$ 94. 80%
W2003 CTY-WIDE SPACE/SECURITY IMPROVEMENTS 1,596,823.56$ -$ -$ 1, 596,823.56$ 100. 00%
W2518 FACILITIES BOBCAT & ATTACHMENT 7,712.00$ -$ -$ 7, 712.00$ 100.00%
W2613 FACILITIES TRACTOR REPLACEMENT 83,500.00$ -$ 81,234.31$ 2, 265.69$ 2.71%
3,614,133.61$
25 of 72
Projects-Expense Only Revised Budget Actuals Encumbered Available Available %
W2614 FACILITIES AUTOMATED MOWING 15,000.00$ 9, 800.34$ -$ 5, 199.66$ 34.66%
W2522 GC ROOF MAINTENANCE 14,901.00$ 14, 675.00$ -$ 226. 00$ 1.52%
W2203 GC UTILITY INFRASTRUCTURE IMPROVEMENT 0.68$ -$ -$ 0. 68$ 100.00%
W2611 GC RECRUITMENT TESTING ROOM 25,000.00$ 13, 905.04$ -$ 11, 094.96$ 44. 38%
W2519 JC FLOORING REPLACEMENT 20,584.00$ 17, 318.15$ -$ 3, 265.85$ 15.87%
W2521 JC VARIABLE FREQ DRIVE REPLACEMENT 11,660.00$ -$ -$ 11, 660.00$ 100. 00%
W2405 JC REPLACE HVAC VALVES 320,662.00$ 4, 329.80$ 213, 489.00$ 102, 843.20$ 32. 07%
W2601 JC LIGHTING CONTROLS REPLACEMENT 133,000.00$ -$ 17,800.00$ 115, 200.00$ 86. 62%
W2603 JC FLOORING REPLACEMENT 50,000.00$ -$ -$ 50, 000.00$ 100. 00%
W2604 JC LONG TERM STORAGE 34,500.00$ -$ 18,467.00$ 16, 033.00$ 46. 47%
W2609 JC CHILD SUPPORT OFFICE/ENTRANCE 40,000.00$ 2, 992.50$ 31, 987.50$ 5, 020.00$ 12.55%
W2610 JC DA ADDITIONAL OFFICE SPACE 240,000.00$ 20, 048.00$ 145, 670.23$ 74, 281.77$ 30. 95%
W2426 WEBSTER HOUSE REPAIRS 356,000.00$ 3, 659.73$ 27, 715.87$ 324, 624.40$ 91. 19%
W2213 SANITARY SYSTEM LINE REMOVAL 47,312.00$ -$ 32,775.00$ 14, 537.00$ 30. 73%
W2602 CAMPUS MAINTENANCE BORDERS 115,000.00$ -$ -$ 115, 000.00$ 100. 00%
W2501 CAMPUS SANITARY & STORM SEWER 660,000.00$ -$ -$ 660, 000.00$ 100. 00%
W2645 PASSENGER VEHICLE WHEELCHAIR 76,812.00$ -$ -$ 76, 812.00$ 100. 00%
W2536 PASSENGER WHLCHAIR ACCESS 175,750.00$ -$ 175,173.00$ 577. 00$ 0.33%
W2644 PASSENGER WHEELCHAIR ACCESS 153,624.00$ -$ -$ 153, 624.00$ 100. 00%
W2612 LURM VEHICLE REPLACEMENT (1) 58,000.00$ 43, 784.32$ -$ 14, 215.68$ 24. 51%
W2541 HHS MAIN BREAKER REPLACEMENT 37,146.00$ 37, 145.49$ -$ 0. 51$ 0.00%
W2409 CDEB MULTIFACETED SENSORY 1,525.00$ 853.77$ -$ 671. 23$ 44.02%
W2505 CDEB FLOORING REPLACEMENT 13,949.00$ 13, 949.00$ -$ -$ 0.00%
W2506 CDEB EXTERIOR SIDING REPAIR 553,677.00$ -$ 3,500.00$ 550,177.00$ 99. 37%
W2618 CDEB FLOORING REPLACEMENT 60,000.00$ 31, 675.00$ 11, 950.00$ 16, 375.00$ 27. 29%
W2619 CDEB DISHWASHER REPLACEMENT 41,000.00$ -$ -$ 41, 000.00$ 100. 00%
W2620 CDEB POOL UV LIGHT & CONTROLS 35,000.00$ -$ -$ 35, 000.00$ 100. 00%
W2306-Rollup LHCC BUILDING PROJECTS 1,915,696.46$ 1, 219,135.22$ 616, 056.68$ 80, 504.56$ 4. 20%
W2511 LHCC ROOF & EXTERIOR REPAIRS 236,419.19$ 131, 854.67$ 104, 507.65$ 56. 87$ 0.02%
W2512 LHCC FURNITURE REPLACEMENTS 1,634.18$ 1,631.00$ 0. 00$ 3.18$ 0.19%
W2514 LHCC REKEYING 18,635.12$ (4, 064.54)$ 18, 499.85$ 4, 199.81$ 22.54%
W2621 LHCC VACANT WING MODIFICATION 190,000.00$ -$ -$ 190, 000.00$ 100. 00%
W2622 LHCC FURNITURE REPLACEMENTS 168,000.00$ 61, 192.52$ 105, 650.71$ 1, 156.77$ 0.69%
W2623 LHCC RESIDENT TRANSPORT VEHICLE 100,000.00$ -$ -$ 100, 000.00$ 100. 00%
W2624 LHCC KITCHEN WORKTABLE REPLACE 78,000.00$ 6, 229.90$ 52, 959.00$ 18, 811.10$ 24. 12%
W2625 LHCC ADMIN AREA RENOVATION 50,000.00$ 24, 976.95$ -$ 25, 023.05$ 50. 05%
W2626 LHCC OFFICE FURNITURE REPLACEMENT 45,000.00$ 40, 695.70$ 1, 183.65$ 3,120.65$ 6.93%
W2627 LHCC REAR EMPLOYEE ENTRANCE 35,000.00$ 23. 05$ 20,285.00$ 14, 691.95$ 41. 98%
W2629 LHCC INDUSTRIAL DRYER REPLACEMENT 9,000.00$ -$ -$ 9, 000.00$ 100.00%
W2628 LHCC CONVECTION OVEN 11,000.00$ -$ -$ 11, 000.00$ 100. 00%
W2646 LHCC WATER HEATER REPLACEMENT (2) 24,684.00$ 24, 684.00$ -$ -$ 0.00%
W2648 GC FACILITY ASSESSMENT 200,000.00$ -$ -$ 200, 000.00$ 100. 00%
Project Total 14,359,432.92$ 3,570,314.47$ 2, 613,546.92$ 8, 175,571.53$ 56. 94%
Lapse Project
26 of 72
To:
CC:
From:
Date:
RE:
Rank Status
1
N/A
2 Construction
Phase
3 Construction
Phase
4 Closure Phase
5 Construction
Phase
Memorandum
September 8, 2026
Walworth County Public Works Committee
Walworth County Administrator - Mark Luberda
Richard Hough - Public Works Director
Construction in progress. Stage-3 construction (Center
St. to George St) is underway. Highway remains open to
through traffic with reduced lanes.
CTH H - USH 12 to Co. Line
The highway is closed to through traffic, but remains
open to local traffic. Detour is in place for non-local traffic
and trucking.
Pavement Preservation
Strategies - Highway Div.
Chip seal operations were completed on 18.9 miles of
roadway, including sections of CTH P, CTH O, and CTH
NN. Reclamite was completed on CTH O and multiple
campus parking lots.
Lakeland Health Care
Center Renovation
Several air handling units are sweating, and two VAVs
lack dampers, causing excess moisture. Some systems
need low temperature sensors before proper sequencing.
Project Remarks
Lake Beulah No Parking
Zone
The department inspected the area and identified that all
appropriate No Parking signage is in place. Use of
barriers in the right-of-way, e.g., rocks is not safe and
fencing is appropriate due to public and repairing access
rights.
CTH H - Lake Geneva
Construction and Project Management Summary Report - September 2026
Director's Top Five Projects: (including $1M+ Projects)
27 of 72
Page 2
CO # % Change (since
last approval)
1 0.18%
2 1.24%
2 8.40%
1 0.26%
2 2.77%
1 3.86%
2 8.47%
Date
16-Jul
26-026 Price Park Natural Play Structure
$2,882.00
26-003 CTH-H (Williams to STH-120), 240H1 $1,938.00
1090-25-01/71
I-43 Rock Freeway
WIS 50 to US 12, Walworth County, Replace the deteriorating pavement
and address substructure conditions and decreased
ride quality; Preserve the condition and service life of the existing bridge
structures; Address safety, operational, and drainage needs. Queuing
along the I-43 SB off ramp to STH 67 blocking right turn lane. FY 29-31
26-026 Price Park Natural Play Structure
$3,433.38
Highlights and Activities
WisDOT Design Highlights
Project
26-003 CTH-H (Williams to STH-120), 240H1 $11,575.00
Change Orders (Report Only)
Project # Title Value $
25-124 SO Exterior Building Remediation $19,050.00
24-073-R2 SO Hot Water Heating System & CUH $23,743.00
26-009 CTH-H (USH-12 to County Line), 250H1 $4,229.60
28 of 72
Page 3
Project Highlights and Activities
County Engineer Major Project Summary (Since Last Report)
W2648
Government Center
Facility Needs
Assessment
Highlights and Activities
26-003 - CTH-H
George St. to Geneva
Square
26-009- CTH-H
USH-12 to Co. Line
Construction in progress. Stage-1 & 2 construction (Center St. to E. Geneva Square) is
substantially complete. Stage-3 construction (Center St. to George St) is underway.
Highway remains open to through traffic with reduced lanes.
Bridge inspections (County and Local) are underway. Delivery of final inspection reports
anticipated later this year.
Construction in progress. Culvert replacements, drainage improvements and pavement
removals complete. Highway is closed to through traffic, but remains open to local traffic.
Detour is in place for non-local traffic and trucking.
Project
Associate County Engineer Top 3 Project Summary (Since Last Report)
2026 -Countywide
Bridge Inspections
Excel Engineering has begun existing building report reviews and scheduling on-site
inspections of the building and the proposed CIP projects. The onsite review will include a
mapping document of the spaces via 3D spatial data platform.
Needs assessment questionnaires are being prepared for input from the county
departments later this month.
26-032
Emergency Mitigation
Services
24-056 / W2306,
W2307, W2414
Lakeland Health Care
Center Renovation
We are still waiting for final inspections from the local and state inspectors to move into the
last wing and finalize the closeout of the contract. The Compliance Statement and testing
and balancing reports were issued. The punchlist work is progressing as the mechanical
system adjustments are being made to address overall operations and controls.
Statement of Qualifications (SOQ) is being evaluated for Master Services Agreements
(MSA) with multiple emergency mitigation services contractors, should the need arise.
Request for qualifications went out in August 2026. Award recommendations are
anticipated in October 2026.
29 of 72
Page 4
DD (Name) Highlights and Activities
Barry Pierce
Barry Pierce
Barry Pierce
Vijay Narayanan
Vijay Narayanan
Vijay Narayanan
Deputy Director(s) Top 3 Summary (Since Last Report)
Lakeland School
Reclamite This pavement preservation technique was completed on CTH O and
multiple campus parking lots
Operating Budget &
CIP Development
Service Contracts
Continuing workload for Service Contracts and/or Cooperative Purchase
Agreements.
1) Completed: Extension of Janitorial Cleaning Services
2) In-Progress: SO Range - HVAC PMs & Services & Lead Filter Removal;
Elevator Maintenance & Repair Service; CRAC Unit PMs & Repairs; JC - X-
Ray PM & Services; Water Treatment Services
Completion of Summer Project in Preparation for 2026/2027 School Year:
- Courtyard Pergola Stain Finish
- Planter beds, tree berms, and courtyard beds - clean, prune, and top-
dress with mulch
- Classroom flooring projects
- Interior flooring cleaning projects
- Pool maintenance & cleaning projects
Development of 2027-2036 CIP 1-5 Year Projects and 2027 Operating
Budget
Project
Shouldering This maintenance was completed from HWY 12 to CTH P to preserve
roadway edges
County Chip Seal This pavement preservation technique was completed on 18.9 miles of
roadway including sections of CTH P, CTH O, and CTH NN
30 of 72
Page 5
PM (Name) Highlights and Activities
Joe Latocha
Joe Latocha
Joe Latocha
Elliott Blaszczyk
Elliott Blaszczyk
Elliott Blaszczyk
Replacement of the back employee entrance at LHCC. Includes double
doors, electrified mullion, and relocation of card reader. Vendor is
expected to get the door September 23rd.
W2627 LHCC Rear
Employee Entrance
The playground base, structure, and border are installed. Currently
waiting on net, rope, and clambering loop features to be shipped and
installed.
W2538 Price Park
Natural Playground
W2405 Judicial Center
HVAC Valve
Replacement
Heating valve replacements have begun. The entire basement and 3/4 of
the 1st floor are complete. Building heat is ready to be turned on at any
point if needed. An additional 43 VAVs will be added to the project to
complete the 2nd floor this year. The 3rd floor is to be completed in 2027
if additional budget is approved.
Project Manager(s) Top 3 Summary (Since Last Report)
Project
W2608 SO Outdoor
Range
DPW is moving forward with Terracon to develop an RFB for remediating
lead at the shooting range. Concurrently, DPW is working on a solution to
rebuild the shooting range following the remediation process.
RFP reviewed by purchasing, DPW is working through recommended
changes.
New Heating System has been commissioned and is running. Punchlist
items are expected to be completed by mid-late October. Lead times on
specialized materials has extended the project completion date slightly.
W2003 Phase II
Security RFP
W2402/W2404 Boiler
& Cabinet Unit Heater
31 of 72
Approved
Enacted 10/22/2021
Form 6-310-B
Revised 07/18/2025 Change Orders
Page 1 of 2
Form 6-310-B: Project Change Order Internal Routing Approval Request
Contract Name: 26-003 CTH-H (Williams to STH-120) Contract Number: 2770
Vendor Name: Payne & Dolan, Inc. Department Purchasing Contact: J. Kroll
1. Change Order D etails Change Order( s) #: 3
Type of Change Order (select all that apply):
☐ T he work outlined in the cha nge order has already been performed. Failure to proceed with the change order would have
resulted in cessation of work and financial loss.
☒ P roposed work is beyond the original scope of work.
☒ P roposed work could not have been reasonably foreseen by architect, contractor, vendor , or County.
☐ P roposed work due to error or omission (further explained in comments below).
☐ S avings as a result of reduced scope or value engineering.
Change Order(s) Description: Labor, equipment and materials to construct a lane widening and two-way left turn lane
along CTH-H between Center St. and Sheridan Springs Rd.
☐ Special circumstances/emergency/timing concerns requiring immediate action
☒ Updated Contract Dates: October 16, 2026
☐ Additional scope of work (justification to amend contract vs. a separate procurement in comments below)
Additional Comments: N/A
2. Change Order Amounts/Funding
Change Order Amount: ☒ Actual (firm fixed, not-to-exceed) ☐ Estimated (indefinite quantity, time and materials, etc.)
O riginal Contract Amount ................................................................................... $ 1,085,998.98
P rior Approved Change Order(s) ............................................................................. $ 13,513.00
A mount of this Change Order(s): ........................................................................... $ 200,486.41
R evised Contract Total with this Change Order(s) : ............................................ $ 1,299,998.39
P ercentage of total change orders, including this change .................................................. 19.7%
P roject Contingency Remaining: ............................................................................ $ 286,487.00
Account Number/Name: 4170H-58140-240H1/CTH H (Williams to STH 120) Budget Sufficient? ☒ Yes ☐ No
Budget/Funding Comments: N/A
3. Review Process (DPC to check the box for each applicable approval required.)
Reviewer approval confirms the change is reasonable, in the County’s best interest, and funds are available.
A
ll approvals are obtained electronically through the Intake Request
(except for Committee Approval/Report)
☒ Department Head
☒ Purchasing Manager
☐ Corporation Counsel (if non-standard/vendor change order)
☒
Finance Director/Highway Commissioner (if within authority or proceeding to Administrator or Committee)
☐ County Administrator (if special circumstances, reissuance, or proceeding to Committee)
Co
mmittee: Public Works Type: Report Only Meeting Date: ___9/14/2026___
Committee: N/A Type: N/A Meeting Date: ___________
32 of 72
Approved
Enacted 10/22/2021
Form 6-310-B
Revised 07/18/2025 Change Orders
Page 2 of 2
33 of 72
Approved
Enacted 12/06/2019 Form 6-225-A
Revised 04/14/2026 Waiver of Competition Page 1 of 3
Form 6-225-A: Waiver of Competition
Completed by Requesting Department
Waiver of competition (WOC) category: ☐ Sole Source ☒ Non-Competitive
Date of request: 8/25/2026 Are grant funds being used: ☐ Yes ☒ No
Account: Org: 5525 Object: 53610 Project: N/A Grant allows WOC?: ☐ Yes ☐ No ☒ N/A
Requesting department: PW-Highway Department contact: Vijay Narayanan
Description of good or service: Snowplow replacement cutting-edge blade profiles purchased
for winter maintenance operations.
Vendor information: Name: Burke Truck & Equipment Inc.
City, State, Zip: Madison, WI 53718
Website address (if available): www.burketruck.com
If the good is a brand name or proprietary to one manufacturer, can more than one
distributor provide the product to the County? ☒ Yes ☐ No ☐ N/A
Total cost, including all options for renewal or extension: Estimated Total Cost is
$103,265.53. Because the quote has a short expiration period, this WOC will allow for a cost
adjustment of +/- 2.5%
Requested term of WOC: ☒ One-time purchase ☐ Recurring purchase/contract
Contract term: N/A
If recurring purchase, describe anticipated future purchases, including on-going
maintenance: N/A
Uniqueness, Special Circumstance and/or Time Constraints
Explanation of uniqueness of good or service, including a description of the patented or
proprietary features, and/or sole-source nature of the good or service: The snowplow
blades are unique due to their carbide‑reinforced cutting edges, OEM‑specific mounting
patterns, and compatibility requirements with the County’s existing plow equipment. These
patented design features ensure proper fit, performance, and durability, making the product safe
and reliable for winter road maintenance.
How are unique features essential to department: These snowplow blades are fully
compatible with the department’s existing snowplow equipment, meet required performance and
safety standards, and provide the durability needed for reliable winter road maintenance.
Special circumstance, prior investment considerations, and/or time constraints, if any:
Carbide pricing remains highly volatile, driving snowplow blade costs significantly higher than in
past purchasing cycles. Securing blades now allows the department to lock in current pricing
and avoid further increases. During this process, the originally considered vendor (Nordik)
became unresponsive, compressing the timeline and reinforcing the need to pursue a WOC to
ensure timely sourcing and delivery ahead of the winter season. Given pricing volatility and the
need to maintain winter operational readiness, prompt procurement is essential for both budget
stability and reliable service.
34 of 72
Approved
Enacted 12/06/2019 Form 6-225-A
Revised 04/14/2026 Waiver of Competition Page 2 of 3
Alternative Sources
An alternatives sourcing search was conducted consisting of (check all that apply):
☒ Market research ☒ Contacted other vendors ☐ Other
Describe the alternative sourcing efforts: The department obtained quotes from three (3)
vendors and compared pricing against cooperative contract options available through NASPO.
Cooperative vendors were evaluated but ultimately not selected due to higher pricing or, in the
case of Nordik, lack of responsiveness. Because Nordik was non-responsive and other
cooperative vendors offered higher pricing, these alternatives did not meet the department’s
needs. Therefore, pursuing a WOC was necessary to ensure a reliable and timely supply.
List all alternative sources investigated and reason good/service does not meet need:
1. Three (3) vendor quotes: Burke Truck & Equipment; DMC Wear Parts; Gray’s Inc
2. Comparison of unit pricing from Nordik NASPO ValuePoint Master Agreement Number
47646 ($1,290 for 4-ft; $967 for 3-ft blade)
3. N/A
Cost Analysis
Cost has been fairly and reasonably established by (check all that apply):
☒ Comparison to public sector contract
pricing
☐ Comparison to previous comparable
pricing
☐ Discount off of published price
☒ Market survey of other vendors
☐ Other
Department explanation of above efforts ensuring fair and reasonable pricing: The
department verified fair and reasonable pricing by obtaining competitive quotes from three (3)
vendors and comparing unit costs for 3‑ft and 4‑ft blade sections against NASPO cooperative
contract pricing. This review confirmed that the selected vendor’s (Burke) pricing aligns and is
most favorable with current market conditions.
Describe any financial benefits or implications of the requested waiver, which may
include such issues as avoiding future costs, extending useful life, secondary or indirect
cost savings, etc.: The requested waiver provides financial benefits by avoiding additional cost
increases driven by ongoing volatility in carbide pricing.
All approvals are obtained electronically
1) Department Head
2) Purchasing Manager or Supervisor (final approver if <$25,000)
3) County Administrator (if ≥$25,000)
☐ DPC to report to appropriate Committee if ≥$100,000. Electronic Approvals are
included below for Committee Reporting only.
Committee/Date Reported Public Works 9/14/2026
35 of 72
Approved
Enacted 12/06/2019 Form 6-225-A
Revised 04/14/2026 Waiver of Competition Page 3 of 3
36 of 72
M
emorandum
To: Public Works Committee Members
Cc: Walworth County Administrator – Mark Luberda
Sheriff’s Office – Sheriff Gerber
From: Public Works Director – Richard Hough
Date: September 1, 2026
Re: E ‑Bike Safety, Regulation, and Policy Recommendations
Most states, including Wisconsin, have adopted a three‑class system that distinguishes
e‑bikes by their speed capability and motor assistance type. This model has become the
nationwide standard, offering a uniform language for manufacturers, retailers, and
policymakers.
W
isconsin’s statutes regulating e‑bikes align with this three‑class model. Class 1 and
Class 2 e‑bikes assist riders up to 20 miles per hour, while Class 3 pedal‑assist bicycles
can reach 28 miles per hour and require riders to be at least sixteen years old. The
statutes permit e‑bike use on public roads and bike lanes, treating them largely the
same as traditional bicycles. However, shared‑use paths and trails are governed by local
authorities and the Wisconsin DNR, which generally allow Class 1 and Class 3 e‑bikes
on many state trails but limit speeds to 15 miles per hour and prohibit certain
throttle‑equipped Class 2 models. These statewide and DNR rules form a reasonable
foundation but do not fully address emerging safety concerns involving youth ridership,
trail conflicts, and illegal aftermarket modifications that increase speed capability, and
new, more powerful e-moto bikes and scooters with motors exceeding 750 watts.
Con
sidering these trends, Walworth County can provide leadership by advocating for a
set of statewide improvements to harmonize rules, strengthen safety practices, and
distinguish e-bikes from other bicycles in reporting. A minimum age of 15 for all
categories of e-bikes and 16 for e-moto equipment with engines greater than 750 watts,
and mandatory registration is also recommended.
O
ther meaningful recommendations the county could consider include banning
unregistered vehicles (e-bikes) for commuting purposes, e.g., daily commute to and
37 of 72
Re: E ‑Bike Safety, Regulation, and Policy Recommendations
from school. Restrict e-bike and e-motos for school-age children to one person. Restrict
use of earbuds or headphones while riding.
R
eference Data:
1
Article, April 15 29, 2026, Illinois Senate Unanimously Passes Giannoulias E-Bike Bill
2 Article, Riding into school year with a focus on safety.
3 E-bikes, E-scooters and E-motos Flyer, Children’s Wisconsin
C
urrent Rider & Safety Regulations
• Helmets: No statewide e-bike helmet mandate exists, though helmets are heavily
recommended and required for all riders under 18.
• Age Restrictions: Operators of Class 3 e-bikes must be 16 years or older.
• Sidewalks: Sidewalk riding is dictated by local municipal code; state statute does
not allow sidewalk riding unless local ordinances explicitly permit it.
• E-Motos: Bikes modified to exceed these speed caps or powered by motors
larger than 750 watts lose their e-bike status and may be regulated as mopeds or
motorcycles.
S
ummary Recommendations for County Ordinance
• Age Restrictions: .
o Operators of Class 1 & 2 e-bikes must be 15 years or older.
o Operators of Class 3 e-bikes must be 16 years or older (State Law)
o Operators of e-motored vehicles capable of 28 mph (or more) must be 16
years or older.
• Sidewalks: Restrict e-bikes on all sidewalks within the County rights-of-way.
• Registration: Bikes and e-vehicles larger than 750 watts lose their e-bike status
and may be regulated and registered as mopeds or motorcycles.
• Requirements: A headlight and taillight are required on E-bikes and E-scooters
for nighttime riding. Restrict the age for all e-bikes and e-motos capable of
speeds of 28 mph or more to riders aged 15 to 18 years old. Forbid use of
earbuds or headphones while riding e-bikes and other e-moto vehicles.
• Penalties: Riders in violation of the age requirement, permitted riding location,
required equipment or means of responsible operation can be cited by the
Sheriff’s Office. Fines can be issued up to $500 based on the number of offenses.
In addition, riders committing reckless conduct can have the device impounded
for a period of up to 60 days, along with additional fines issued.
S
ummary Recommendations for County Resolution
• Helmets: Required for all e-bike and e-moto riders between 15 to 18 years old.
• Age Restrictions: .
o Operators of Class 1 & 2 e-bikes must be 15 years or older.
o Operators of Class 3 e-bikes must be 16 years or older (State Law)
38 of 72
Re: E ‑Bike Safety, Regulation, and Policy Recommendations
o Operators of e-motored vehicles capable of 28 mph (or more) must be 16
years or older.
• Registration: Bikes and e-vehicles larger than 750 watts lose their e-bike status
and may be regulated and registered as mopeds or motorcycles. Forbid use of
earbuds or headphones while riding e-bikes and other e-moto vehicles.
• School Training: Mandate that elementary and junior high schools provide a
minimum of 2 hours of annual training on e-bikes and general transportation rules
annually.
39 of 72
E-bikes, E-scooters and E-motos
Speed Changes Everything
Who Should Ride?
• Children younger than 12 should not ride
e-bikes, e-motos or e-scooters.
• Kids ages 12 to 15 may ride only a Class 1
e-bike if a parent feels they are ready and
can ride safely.
• Kids 16 years and older may ride e-bikes and
e-scooters. They may ride e-motos if they are
registered and the rider has a license.
What Kind of Helmet Should Your Child Wear?
A regular bike helmet may not protect your child
in a high-speed crash. Choose a helmet made
for faster speeds. Look for one with one of these
safety labels on the inside liner of the helmet:
• ASTM F1952
• NTA 8776
• DOT
Every rider should wear a properly fitted,
speed-rated helmet every time they ride.
Ho
w Can You Help Your Child Ride Safely?
Help keep your child safe by making sure they:
• Wear a helmet every ride.
• Wear closed-toe shoes.
• Wear bright clothing.
• Use lights if you ride when it is getting dark.
childrenswi.org/safetycenter
safetycenter@childrenswi.org
© 2026 Children’s Wisconsin. All rights reserved. CS_SAF_324_0726
Safety Center
E-bikes (electric bicycles), e-scooters (electric scooters) and e-motos (electric motorcycles or dirt
bik
es) are becoming more popular with kids and teens. They go much faster than regular bikes and
sc
ooters, so they can be more dangerous. Crashes can cause very serious injuries or death.
• Know the rules of the road.
• Watch for people walking and for cars.
• Keep their phone put away.
• Do not wear earbuds or headphones while
riding.
• Never carry another person on an e-bike
or e-scooter.
• Follow local rules for riding.
Is Your Child Ready?
Think about if your child can:
• Follow traffic rules.
• Always pay attention.
• Stay off their phone while riding.
• Make safe choices, even when friends are
around.
You can ask yourself:
Would I trust my child to safely ride a
motorcycle or moped?
If the answer is no, your child is probably not
ready for an e-bike, e-scooter or e-moto.
40 of 72
41 of 72
42 of 72
43 of 72
44 of 72
Home 2026 News Illinois Senate Unanimously Passes Giannoulias E-Bike Bill
Illinois Senate Unanimously Passes
Giannoulias E-Bike Bill
Comprehensive micromobility safety plan targets dangerous high-speed e-bikes, e-motos and other
unregulated electric devices exceeding 28 mph
Illinois Senators today approved a sweeping statewide safety initiative spearheaded by Secretary of State Alexi Giannoulias to address the
growing dangers posed by unregulated high-speed e-bikes, e-motos and other powerful electric transportation devices operating on streets,
bike lanes and sidewalks across the state.
“As these devices become faster, heavier and more powerful, our laws must keep pace to protect riders and the public,” Giannoulias said.
“This initiative closes dangerous regulatory gaps, creates uniformity across Illinois communities and ensures riders understand the
responsibilities that come with high-speed electric devices. We’re replacing a confusing patchwork of local rules with clear statewide
standards that prioritize safety.”
The legislation is part of Giannoulias’ Ride Safe, Ride Smart, Ride Ready campaign – a multi-pronged effort combining public education,
updated rider training and legislation designed to modernize Illinois law as the micromobility industry rapidly evolves. From 2019 to 2022,
micromobility-related injuries and fatalities surged 300% across the country, including Illinois.
Giannoulias credited State Sen. Ram Villivalam (8th District – Chicago), Chair of the Senate Transportation Committee and sponsor of the
legislation, while lauding members of the Senate for passing SB 3336 unanimously 54-0. He also thanked the wide-ranging group of
stakeholders who provided input, including: the Illinois Municipal League (IML), Illinois High School and College Driver Education
Association, Ride Illinois, Illinois Association of Chiefs of Police, ABATE, and Lurie Children’s Hospital. The Illinois House will now consider
the bill, where it is sponsored by State Rep. Barbara Hernandez (50 District – Aurora).
“Micromobility is quickly transforming how Illinoisans get around and is now part of everyday life, but innovation without guardrails puts
people at risk,” Villivalam said. “This legislation brings safety, accountability and common-sense protections to reflect today’s reality and a
new era of mobility.”
“This is exactly the kind of forward-looking legislation Illinois needs as new technology reshapes how people travel,” Hernandez said. “By
setting clear statewide rules for higher-speed devices, we are protecting riders, reducing confusion for law enforcement and helping
prevent avoidable tragedies before they happen."
The initiative focuses on higher-powered, higher-speed devices that fall outside current state definitions or remain largely unregulated,
including certain e-bikes, e-motos and electric scooters, skateboards and unicycles. Illinois currently has no laws governing e-bikes and
other micromobility devices that exceed 28 mph. Many of these devices have motors that exceed 750 watts and can travel well beyond 28
mph – in some cases over 50 mph – yet are not clearly addressed under existing law.
Illinois will maintain its current three-class e-bike structure, which covers pedal bicycles with electric motor assistance up to 28 mph – a
framework already used in 46 other states. Under the proposal, those classi fications would remain unchanged except for new age
requirements that a rider on a Class 1 or Class 2 must be at least 15 years old.
Under the legislative framework:
Riders of e-bikes and e-motos capable of traveling over 28 mph would be required to have a driver’s license, title, registration and
insurance.
High-speed micromobility devices such as e-scooters, electric skateboards and electric unicycles would be prohibited from operating
over 28 mph on roads, bike lanes, bike paths and sidewalks. In addition, riders of any electric micromobility device must be at least 16
years old.
...
April 15, 2026
th
8/17/26, 7:59 AM Illinois Senate Unanimously Passes Giannoulias E-Bike Bill
https://www.ilsos.gov/news/2026/april-15-2026-illinois-senate-unanimously-passes-giannoulias-e-bike-bill.html 1/2
45 of 72
The legislation establishes statewide consistency, replacing the current patchwork of local ordinances that vary widely from one
municipality to another.
If signed into law, the bill would take effect on January 1, 2027 . E-bikes and e-motos purchased prior to that date would be exempt from the
title requirement but must still be registered.
Along with the legislation, the Ride Safe, Ride Smart, Ride Ready campaign will deliver:
Statewide public awareness outreach for parents, riders and retailers,
Updated driver education materials focused on sharing the road safely,
Law enforcement guidance and community safety partnerships, and
Outreach to schools and municipalities on responsible micromobility use.
The initiative is part of the Secretary of State’s broader effort to modernize transportation safety laws and respond proactively to emerging
technologies before preventable injuries and fatalities continue to rise.
-#-
Back to Top
8/17/26, 7:59 AM Illinois Senate Unanimously Passes Giannoulias E-Bike Bill
https://www.ilsos.gov/news/2026/april-15-2026-illinois-senate-unanimously-passes-giannoulias-e-bike-bill.html 2/2
46 of 72
M
emorandum
To: Public Works and Parks Committee Members
Cc: Walworth County Administrator – Mark Luberda
From: Public Works Director – Richard Hough
Date: September 1, 2026
Re: ATV Discussion on Multimodal Use on White River County Trail
The Department of Natural Resources has a five-step process for ATV trail development
outlined in its ATV and UTV Trail Guidelines, Publication PR-391, Version 07.01.22,
which are outlined below:
Th
e most important first step in
planning a trail is to determine the
trail’s purpose and objectives. Why
do we want this trail? Who will use
the trail? What needs will the trail
meet? (Examples of needs a trail
could be intended to meet: local
economic development, regional
recreational demand, transportation,
connectivity.) How will it be managed,
maintained, constructed, and
funded? Funding considerations
should include initial investments and
long-term maintenance needs. This
can be dictated by a number of
factors, but available resources for
construction, maintenance, and
management should be key factors.
A trail cannot provide every type of
experience desired by diverse user
groups. Take time to consider and
determine what kind(s) of trail you
are going to provide – what will the
47 of 72
Re: ATV Discussion on Multimodal Use on White River County Trail
allowed uses be, what will the managed and designed uses be? Further, recognize that
this will likely not result in the ideal experience for all allowed trail uses. There are many
other viewpoints to consider when planning to incorporate ATVs on existing trails, on
both the user side and in trail management and maintenance. Factors such as available
resources, trail concept, and setting must be looked at holistically when determining the
kind of experience to be offered and maintained on a trail.
W
hile DNR is ultimately responsible for any decision to incorporate ATVs on White River
Trail, the Department of Public Works management and staff do not believe it is wise to
pursue, given a history of insufficient maintenance due to a lack of resources (staff time,
grant funding) to maintain and keep the trail safe for multiple types of users.
48 of 72
M
emorandum
To: Public Works Committee Members
Cc: Walworth County Administrator – Mark Luberda
From: Public Works Director – Richard Hough
Date: September 2, 2026
Re: Public Works Committee Priorities for Government Center Study
Director requests that you give consideration to your information priorities during the
Government Center Study. The process will include future committee progress reports
and then a final report. However, consider what your priorities for the study may include.
Example priorities: seeking information on minimum footprint requirements for any new
facilities; I am most interested in the longevity and total costs of the existing facility; or, I
am interested in the maximum longevity of a new building versus the realistic max life-
cycle of the current facility.
Now
that a consultant is onboarded, your guidance will be valuable to the study and
process. Current tasks for the consultant include:
T
ask 1 – Physical Facility Assessment
Task 2 – Functional Facility Assessment, e.g. Adjacency Analysis
Task 3 – Develop New Facility Options
Task 4 – Cost Estimation and Comparative Analysis
Task 5 – Presentation of Analysis
Task 6 – Alternatives Analysis
Task 7 – Peer Review of Exterior Study
49 of 72
1
Memorandum
To: W
alworth County Public Works Committee
Cc: Walworth County Administrator – Mark Luberda
Cc: Other Department Heads Involved in Committee
From: Richard Hough, Director of Public Works RAH
Date: September 7, 2026
RE: Rooted in Service, Powered by Community Needs – 2027 Operating Budget
Walworth County Public Works (PW) employs a team of seventy-one skilled, dedicated
employees who provide a range of services for county residents and other departments.
WALCO services are set and scheduled by task, staffing availability, and frequency needs. Our
goal is to deliver these services in a timely, efficient, professional, and safe manner. Public
Works services are defined by a level-of-service commitment and guided by state and federal
regulations and internal policies. This document provides an overview of the department's
organizational structure and payroll costs, followed by Public Works service standards,
associated goals and key performance measures, which guide the development of our 2027
Operating Budget.
TAB
LE OF CONTENTS
ORGANIZATIONAL STRUCTURE & PAYROLL 2
HIGHWAY OPERATIONS 4
Highway Winter Maintenance Service 4
Roadway Management 6
Roadside Management 9
ASSET MANAGEMENT DIVISION 10
Facilities Management 10
Fleet Management 12
Parks Management 14
SOLID WASTE PROGRAM 16
HIGHWAY INFRASTRUCTURE 18
FACILITIES / PARKS INFRASTRUCTURE 20
Level of Service Clarifications 21
50 of 72
2
ORGANIZATIONAL STRUCTURE & PAYROLL
Position 2026 Budget
Current
Positions
2027 Budget
Request
E
nding
Resul t
Public Works
Public Works Director 1.00 1.00 1.00
County Engineer 1.00 1.00 1.00
Business Office Coordinator 1.00 1.00 -1.00 0.00
Business Office and Logistic Services Supervisor 0.00 0.00 1.00 1.00
Facilities
Deputy Director Asset Management (also Fleet & Parks) 1.00 1.00 1.00
Associate County Engineer Civil 1.00 1.00 1.00
Senior Project Manager 1.00 1.00 1.00
Project Manager 1.00 1.00 1.00
Facilities Foreman 1.00 1.00 1.00
Operations Support Assistant 1.00 1.00 1.00
Maintenance Technician I 1.00 2.00 2.00
Maintenance Technician II 4.00 2.00 2.00
Maintenance Technician III 6.00 6.00 6.00
Journeyman Electrician-New 2026 0.00 1.00 1.00
Finance
Finance Manager 1.00 1.00 1.00
Senior Accountant 1.00 1.00 1.00
Accounting Assistant 1.00 1.00 1.00
Fleet
Fleet Foreman 1.00 1.00 1.00
Mechanic I 1.00 1.00 1.00
Mechanic II 5.00 5.00 5.00
Fleet Inventory Specialist 1.00 1.00 1.00
Highway
Deputy County Highway Commissioner 1.00 1.00 1.00
Superintendent 3.00 3.00 3.00
Assistant Superintendent 4.00 4.00 4.00
Highway Maintenance Worker 28.00 28.00 28.00
Operations Support Assistant 1.00 1.00 1.00
Parks and Grounds 0.00 0.00
Environmental Resource and Park Foreman 1.00 1.00 1.00
Groundskeeper 2.00 2.00 2.00
Total Positions 71.00 71.00 0.00 71.00
Department of Public Works Headcount
The Director recommends creating a streamlined
Administrative Section to improve internal use of
IT systems, administrative workflows, and
logistics accountability operations.
51 of 72
3
52 of 72
4
HI
GHWAY OPERATIONS
S
implified Level of Service Statement: Walworth
County maintains approximately 400 county lane
miles and 700 state lane miles. Winter maintenance
prioritizes driving lanes and ramps based on WisDOT
Categories 3–5. Crews first focus on plowing to
prevent packing, then on achieving passable and,
eventually, bare pavement conditions as soon as
practical after each event. Clear wheel tracks are
acceptable during the transition period when
conditions warrant.
C
ritical Data (Section Lengths):
Client Routes Average Route
Length
Remarks
State Roadways 131 47 46 Statewide Average. Total hours per lane mile
5.04, with Cat. B average of 5.94. County Roadways 10 35.7
1 Route requires five (5) additional plows to clean and maintain ramps and second lanes.
P
rimary Goals: Plowing is the first priority for winter maintenance operations. If packing
should occur, Public Works will then strive for “passable roadway” conditions and
eventually “bare pavement” conditions as soon as practical, after the winter weather event.
During the time between the winter storm event ending and achieving “passable roadway”
conditions, it is acceptable that only clear wheel tracks be provided when conditions
warrant.
K
ey Performance Indicators:
HIGHWAY WINTER MAINTENANCE SERVICE
Mandate(s): Ordinance 16.25
Snow and Ice Removal Plan for
County Trunk Highways and State
Highways; State Statute 84.07(5)
County Highway Department
Maintenance Capacity and Funding
for State Highways; and, WisDOT
Highway Maintenance Manual
(Chapter 6 Winter Maintenance).
53 of 72
5
E
stimated Budget Allocation:
WisDOT Winter Maintenance (RMA) Total: $1,333,870
C
ounty Maint. Total: $1,729,100
(In
tentionally Left Blank)
Key Budget Highlights:
RMA rose 12.3%. The
county budget has no
significant budget changes
from previous years.
NOTE: Payroll figures in
this document do not
account for vacancy payroll
savings, which were set at
3% in coordination with
County Administration.
54 of 72
6
Simplified Level of Service Statement: Routine
maintenance (crack filling, patching, markings, shoulder
repair) is scheduled annually to preserve roadway
condition and extend pavement life. Corrective
maintenance addresses unplanned hazards that require
immediate action. These efforts support the County’s 30–
35–year road improvement life cycle goal and keep both
state and county roads safe for the traveling public.
Below are common crew actions managed by the Highway Division to maintain state and county
roadways:
Maintenance Activity Approximate
Labor Hours
Remarks
Pavement Surface 1,212.25 Maintenance includes Spot Repair, Crackfilling, Sealcoating,
Milling/Bump Removal, and Thin Resurfacing,
County Culvert & Bridge 482.25 County Culvert hours only; Bridge repairs occur during even
years
Guardrail & Impact Attenuator 114 142 individual sections of County Guardrail across 10 Snow
Sections
Pavement Markings 1,201.50 Pavement Markings are refreshed annually
Signage and Traffic Control
Device (TCD)
1,082.50 County Signage inventory of 3,508 signs
Primary Goals: Non-winter roadway maintenance focuses on extending pavement life,
maintaining effective drainage, and ensuring safe travel by filling potholes, repairing rutted
areas, and smoothing rough pavement. The department also maintains bridges and culverts in
good condition, repairs damaged guardrails, updates roadway markings, and coordinates
pavement preservation work with planned road improvement projects to support a 30–35-year
roadway life cycle.
(Intentionally Left Blank)
ROADWAY MANAGEMENT
Mandate(s): Ordinance 16.24
County Trunk Highway
Maintenance and Improvement
Standards; State Statute 83.065
County Road and Bridge Fund –
Tax Levy.
55 of 72
7
K
ey Performance Indicators:
E
stimated Budget Allocation:
WisDOT Non-Winter Maintenance (RMA) Total: $1,638,100 plus an additional
$611,040 for Discretionary Maintenance Agreement (DMA) projects1
1 State RMA budget does not separate out roadway and roadside costs until late 2026.
56 of 72
8
Co
unty Non-Winter Maintenance (RMA) Total: $2,655,000 plus $397,815 (Marking
and Signage Operations)1
1 The county budget groups roadway and roadside activities together; therefore, the tables above combine both
services.
H
ow is it that State Non-Winter Maintenance is nearly $1M more for far less lane mileage (700
State, 400 County)? I’m glad you asked. County non-winter maintenance costs appear higher—
nearly $1 million more—despite fewer lane miles (700 state vs. 400 county) because WisDOT
operates on a shorter roadway life-cycle of approximately 13–17 years, while the County is
working toward a 30–35-year life-cycle. In addition, the County must absorb costs associated
with facilities, park collaborations, and other non-state obligations that are not reimbursed
through State maintenance agreements.
Key Budget Highlights:
We anticipate higher
costs for roadside oil,
paint, and other oil-based
materials. To improve
daily workflow, the
department plans to equip
Highway Maintenance
teams with tablets so they
can record work in real
time, eliminating
end-of-day administrative
tasks that currently
require 18 staff hours. In
addition, the
Administrator’s Budget
shifts certain Purchased
Services costs from the
operating budget to the
Road and Bridge Fund,
providing $1 million to
support small culvert
projects over the next
decade.
57 of 72
9
S
implified Level of Service Statement: The County
maintains 550 centerline miles of roadside areas using
mowing, vegetation control, drainage maintenance, and
litter/encroachment removal. Urban and rural mowing
schedules follow state standards, with tree/brush work
completed primarily in fall and winter to protect wildlife
and reduce safety hazards. Drainage and ditch
maintenance ensure proper water flow and reduce flooding impacts. Below are common roadside
crew actions managed by the Highway Division to maintain state and county roadsides:
Maintenance Activity Approximate
Labor Hours
Remarks
Ditch & Drainage 1,026 New Jetter capability available in 2027
Shouldering 3,162.50 Encompasses daily and large-scale (full crew)
shoulder repair
Vegetation (Mowing, Trimming,
Brushing, Spraying)
5,627.50 State sections = mowed 1x + vision mowing, 5% of
network received VMP spraying; County sections =
2x mowed + vision mowing, 98% of network received
VMP spraying
Encroachment Removal 353 Hazard and non-hazard removal
Litter Control 206.25
Car Killed Deer (CKD) Minimal Contracted service; administration just coordinates
database inputs for pickup
P
rimary Goals: Complete all state mowing prior to the 1st of July. Reduce overall mowing and
invasives along the roadway while improving public safety through herbicides and inhibitors,
proactive roadside maintenance, and an emphasis on water management (drainage).
K
ey Performance Indicators:
ROADSIDE MANAGEMENT
Mandate(s): Ordinance 16.24
County Trunk Highway
Maintenance and Improvement
Standards; State Statute 83.065
County Road and Bridge Fund –
Tax Levy.
58 of 72
10
ASSET MANAGEMENT – DIVISION
S
implified Level of Service Statement: Facilities
Management supports safe, reliable, and efficient
operation of County-owned buildings by performing
routine, preventive, and corrective maintenance. Work
includes daily repairs, scheduled inspections, life-cycle
equipment upkeep, pest control, building security and
safety, energy management, project management, and
coordination of contracted services when specialized
expertise is required. The division ensures that essential
building systems—HVAC, electrical, plumbing,
structural components, and public-service spaces—remain operational, compliant, and well
maintained to support County departments and public use.
B
elow are common services managed by the Facilities Section of the Asset Management
Division:
Maintenance Activity Approximate
Labor Hours
Remarks
Routine Work Orders 18,009 Daily building repairs, control systems adjustments, mechanical
adjustments, and corrective actions of varying complexity are
executed as issues arise.
Preventive Maintenance 4,657 Scheduled equipment servicing (HVAC filters, lubrication cycles,
seasonal inspections, safety systems testing) designed to reduce
failures and extend asset life.
Project Management (small
(up to $40k) projects led by
Maintenance Technicians)
No Prior Data
Available
Project management activities encompass the disciplined
initiation, planning, execution, monitoring, and closeout of
projects to ensure adherence to scope, schedule, budget, and
quality.
Winter Operations 1,207 Winter operations include facility winterization, storm readiness
activities, generator reliability checks, and coordinated support for
departmental needs during winter events and operational surges.
Building Security & Energy
Management
No Prior Data
Available
Key Control, Security Systems Management, Energy Management
Contracted Specialty Work No Prior Data
Available
Vendor-performed repairs and upgrades for systems beyond
in-house capability (advanced HVAC diagnostics, major plumbing
failures, specialized electrical repair, structural reinforcement).
P
rimary Goals: Maintain a safe, functional, and code-compliant built environment for County
employees, public visitors, and operational partners. Reduce same-day reactive work orders by
strengthening preventive maintenance scheduling. Ensure timely completion of PM work orders
to reduce long-term equipment failures and operational disruptions. Optimize resource use by
coordinating vendor services efficiently and leveraging in-house crews for routine and
predictable maintenance.
FACILITIES MANAGEMENT
Mandate(s): Ordinance 16-10(b)(3),
which charters Facilities staff with
the responsibility to maintain the
good working order and long-term
functionality and maintenance of the
facilities. Also, Ord. 16-31(c)
outlines by what standards facilities
are to be maintained.
59 of 72
11
K
ey Performance Indicators:
E
stimated Operating Budget Allocation (Facilities Maintenance):
Location (SF) Total
Utilities2
Facilities
Maint.
($/SF)
Cleaning
(Weekly
Hours)1
Total
(Annual
Change)
Key Budget
Highlights
Government
Center (83,176)
$152,500 $287,390
($3.45)
$76,632
(55)
$516,522
(5%)
Extended cleaning
contract to a rare
seventh year to
reduce overall
budget by $114,000.
Eliminated $50,000
in requested
electricity. Neither
change is reflected
in the numbers
above. Increasing
overall budgets for
facilities
maintenance due to
significant building
life-cycle
milestones, e.g.,
building mid-life.
Sheriff’s Office
A&J (249,000)
$698,300 $511,855
($2.05)
$82,584
(58)
$1,292,739
(4%)
Range (8,280) $11,000 $41,095
($4.96)
$5,000
(3)
$57,095
(6%)
Judicial Center
(132,780)
$224,300 $387,728
($2.92)
$98,196
(73)
$710,224
(2%)
HHS
(74,987)
$107,500 $145,683
($1.94)
$82,872
(58)
$336,055
(12%)
LHCC3
(105,000)
$277,500 $1,495,143
($14.23)
$332,556
(197)
$2,105,199
Lakeland
School
(109,900)
$279,000 $269,282
($2.45)
$176,388
(140)
$724,670
(8.5%)
1 Effective 1 Jun 2027, contract rates increase by 3%, which is reflected in the number above.
2 Reduced electricity request by $50,000, a 4.57 reduction in prior year funding. Department anticipates a hedge of
approximately $120,000 in electricity compared to average requirements.
3. A significant increase in building depreciation costs, along with capital outlays, undermines simple comparison
analysis between years.
60 of 72
12
S
implified Level of Service Statement: The Fleet
Management Section maintains all County vehicles and
rolling equipment to ensure they are safe, reliable, and
ready to support daily operations across Public Works
and other departments. Core responsibilities include
preventive maintenance, timely repairs, lifecycle
planning, and coordination of vendor services for specialized work. The division aims to
maximize equipment uptime, extend asset life, and maintain replacement schedules that support
operational efficiency and long-term cost management.
B
elow are common services of the Fleet Section of the Asset Management Division:
Maintenance
Activity
Approximate
Labor Hours
Remarks
Preventive
Maintenance
(PM)
5,382 Disciplined scheduling and completion of inspections, service intervals, and
component renewals to sustain vehicle reliability, minimize downtime, and
reduce long‑term operating costs.
Shop Inventory
Management
No Prior Data
Available
Controlled management and reconciliation of fleet maintenance parts through
accurate record‑keeping, annual physical counts, and routine spot checks. These
processes validate inventory accuracy, identify gains or losses, and support
operational readiness and fiscal accountability.
Unscheduled
Maintenance
5,685 Responding to unexpected mechanical issues or failures requiring immediate
repair to restore safe, reliable vehicle operation outside planned service
intervals.
Life-Cycle
Management
No Prior Data
Available
Systematic evaluation of vehicle condition, utilization, and cost trends to
determine optimal replacement timing. It supports informed capital planning,
right-sizing, and long-term fleet stewardship through structured life-cycle cost
analysis and coordinated renewal strategies.
Equipment
Procurement,
Onboarding and
Surplus
No Prior Data
Available
Equipment procurement, onboarding, and surplus ensure fleet assets are
acquired, commissioned, and retired in accordance with county purchasing
procedures and lifecycle requirements, maintaining a compliant, cost‑effective,
and operationally aligned fleet.
Turnaround Time No Prior Data
Available
Turnaround Time measures the elapsed time between the initiation of a fleet
maintenance request and the vehicle’s return to service. This LOS standard
ensures timely and efficient repairs by monitoring work‑order progress,
identifying delays, and maintaining predictable service availability across
county operations.
P
rimary Goals: The County Fleet Management section focuses on keeping all vehicles and
equipment safe, reliable, and ready to support daily operations. Primary goals include reducing
unexpected breakdowns through strong preventive maintenance practices, completing repairs
quickly and cost-effectively, and managing the full life cycle of fleet assets—from acquisition
and upfitting to replacement and disposal. The section aims to maintain accurate service records,
optimize parts inventory and vendor coordination, and ensure that vehicles meet safety and
regulatory standards. Together, these goals help the County minimize downtime, control costs,
and ensure dependable support for every department that relies on fleet resources.
FLEET MANAGEMENT
Mandate(s): Ordinance 16-50,
which charters the Public Works
Department, to provide all general
maintenance and major repairs to
all County-owned vehicles.
61 of 72
13
K
ey Performance Indicators:
E
stimated Operating Budget Allocation (Fleet Maintenance):
Key Budget Highlights:
Overall Shop Operations
costs are increasing by
approximately $50,000 due
to higher expenses associated
with building costs,
depreciation, safety supplies,
and department support.
However, the total Shop
Operations budget appears
lower year-to-year because
inter- and intra-department
shop overhead charges
increased substantially. The
prior year’s shop overhead
was underbilled, resulting in
a significant correction for
2027. This correction
increases the internal
overhead offset (SHP OH
OST), which reduces the net
Shop Operations total even
though actual operating costs
have risen.
62 of 72
14
S
implified Level of Service Statement: The Parks
Management section maintains all County parks, trails,
and grounds to ensure they are safe, clean, and accessible
for public use. Responsibilities include routine grounds-
keeping, facility upkeep, vegetation management, seasonal
maintenance, and support for recreational amenities and
public events. The division strives to preserve natural
areas, maintain infrastructure and provide a welcoming
environment that supports outdoor recreation and
community enjoyment. Through proactive care, timely
repairs, and coordinated resource management, Parks
Maintenance ensures County parks remain attractive,
functional, and well-maintained for residents and visitors.
Maintenance Activity Approximate
Labor Hours
Remarks
Natural Areas Vegetation
Management - Parks
No Prior Data
Available
Woodland, prairie, invasive species control mapping and
restoration.
Turf Management – Parks 546 Mowing and string trimming
Facility Upkeep – Parks 1,450 Park Checks, general landscaping
Landscape Vegetation
Management - Campus
1,353 Focus on shrubs, trees, naturalized areas, and non-turf vegetation,
including nutrition and/or herbicide management.
Turf Management - Campus 1,237 Mowing and string trimming
Trail Maintenance 556 Trail maintenance (mowing/ brushing); Signage; Bridge/ Railing
Maintenance
Winter Operations (Plowing) 1,336 Plowing and de-icing operations
Public Event Support No Prior Data
Available
Support for MOU partners entails coordinating authorized
park/trail use, ensuring adherence to partnership terms, and
maintaining safe, orderly conditions during partnered activities.
Facilities Maintenance 56 Repair and maintenance of playgrounds, shelters, and other park
amenities
Facilities Development No Prior Data
Available
Developing new facilities (Trails, Playgrounds, Etc.)
P
rimary Goals: The Parks Section aims to maintain safe, clean, and accessible parks, trails, and
grounds that support year-round public use and community enjoyment. Core goals include
preserving natural areas through effective vegetation management, controlling invasive species,
and protecting sensitive habitats. The section maintains and repairs park infrastructure—such as
shelters, playgrounds, restrooms, signage, and trails—to ensure reliability and safety. Seasonal
responsibilities include storm cleanup, snow management on walkways, and preparing
recreational areas and facilities for peak use. The team also supports community events,
enhances park aesthetics through consistent groundskeeping, and promotes efficient resource
management by coordinating staff, equipment, and materials effectively. Together, these goals
sustain high-quality public spaces, extend the life of park assets, and provide welcoming
environments for residents and visitors.
PARKS MANAGEMENT
Mandate(s): Chapter 16-11 and
Chapter 42 of the WALCO
Ordinance outline the regulated
use of County property (parks &
grounds) but do not outline a
specific mandate to the
Department on maintenance
standards. However,
Administrative Procedure 2-112,
Parks, Grounds and Green Space
Management, outlines
maintenance standards and
department requirements.
63 of 72
15
K
ey Performance Indicators:
E
stimated Operating Budget Allocation (Park Maintenance):
Location Labor
&
Benefits
Ops Total
(Annual
Change)
Key Budget Highlights
Parks & Trails
Admin
$56,864 $42,325 $99,189
(-8.6%)
Natureland is the focus of a
collaboration project to
improve pavement in 2027.
White River Trail is also a
focus area for a collaboration
project.
F
ull deployment of robotic
mowers in 2027 will
influence the redistribution
of funding in the out years.
Exploration and coordination
for a 4th park continue.
Natureland Park $18,140 $40,792 $58,932
(25.5%)
Price Park $33,120 $14,252 $47,372
(-25%)
White River Park $53,360 $44,945 $98,305
(11.4%)
White River Trail $58,720 $9,400 $68,120
(128.6%)
County Complex
Trail
$1,840 $0 $1,840
(103.3%)
Snowmobile Grant $0 -- $102,200
64 of 72
16
SOLID WASTE PROGRAM
S
implified Level of Service Statement: The Walworth
County Solid Waste Program provides safe, accessible
opportunities for residents, businesses that are very small
quantity generators and agricultural operators to properly
dispose of hazardous materials. The program delivers
two semi-annual Household Hazardous Waste,
agricultural waste, businesses that are very small quantity
waste generators and electronic waste collection events,
helping prevent environmental contamination, reduce landfill impacts, and keep waste out of
public right-of-way. A prescription drug drop box is available 24/7 in the Sheriff’s Department
lobby for recycling prescription drugs. Through coordinated planning, public outreach, and
responsible material handling, the program ensures hazardous, electronic, prescription drug and
agricultural wastes are managed in a safe, compliant, and environmentally responsible manner.
P
rimary Goals: The Clean Sweep, or County Recycling Program, aims to protect public health
and the environment by ensuring hazardous household, electronic, and agricultural waste is
collected and disposed of safely. Key goals include preventing pollution, reducing landfill
impacts, and discouraging illegal dumping by providing accessible, well-advertised collection
events. The program seeks to increase or sustain current levels of community participation
through education and outreach, promotes responsible waste-handling practices, and maintains
compliance with state and federal disposal regulations. Together, these goals support
environmental stewardship, safeguard groundwater and soil, and provide residents with a reliable
way to manage hazardous materials responsibly, with minimal or reduced impact on the County
levy.
K
ey Performance Indicators:
Mandate(s): There are no
regulatory requirements to run a
County Clean Sweep (Solid
Waste/Recycling) Program. NR
187 outlines guidance on grant
requirements for state funding.
65 of 72
17
E
stimated Budget Allocation:
Key Budget Highlights:
Anticipated state grant funding
is slightly down, and long-
term revenues from Mallard
Ridge are threatened.
Meanwhile, the popularity of
the Clean Sweep and recycling
programs is growing, with
approximately $111,341 in
county levy required to meet
anticipated program
requirements – tons of waste
collected. Revenues are
estimated at $75K from
Mallard Ridge and $33K from
state grants and donations.
The department is seeking to
establish new vendor
connections to improve
program cost-effectiveness,
leverage social media to cut
advertising, and leverage more
volunteer labor.
66 of 72
18
HIGHWAY INFRASTRUCTURE
W
alworth County aims to sustain an average PASER
rating of 7.0 across the highway network. Major
maintenance and improvement projects are scheduled
through the 10-Year Highway Improvement Plan to
replace pavement, bridges, culverts, and other critical
assets. The county also centrally manages all bridge
inspections, along with local programs. Culverts in
poor condition (Category ≤4) are prioritized for repair
or replacement in line with funding availability and CIP schedules.
P
rimary Goals: Restore the County highway network to a PASER rating of seven (7) or higher.
Prioritize major maintenance or replacement for dams, large culverts, and bridges classified as
fair or poor. Maintain smaller culverts in good to fair condition and coordinate their replacement
with scheduled roadway improvement projects.
K
ey Performance Indicators:
Mandates: Ordinance 16.24
County Trunk Highway
Maintenance and Improvement
Standards; State Statute 83.065
County Road and Bridge Fund –
Tax Levy.
67 of 72
19
K
ey Budget Allocations:
Es
timated Budget Requirements (5-Year CIP):
Key Budget Highlights: As noted in the
roadway section, the County has
established a new budget initiative to
fund ultraviolet (UV) culvert lining. This
approach will allow the County to repair
culverts and extend their service life until
the next scheduled road improvement
project. NOTE: The County's strategy
also assumes significant federal and state
funding for projects.
Key Budget Highlights:
The department is
programmed for a
significant increase in local
bridge inspections due to
normal biannual and
quadrennial requirements.
68 of 72
20
F
ACILITIES/PARKS INFRASTRUCTURE
W
alworth County Project Managers are among the
county's hardest-working staff members and lead new
construction, remodel, and refurbishment projects.
Department project managers ensure projects
minimize operational disruptions, keep county staff
and patrons safe, and maintain the facilities' good working order, long-term functionality, and
maintenance.
P
rimary Goals: Maintain county facilities in good state of repair. Sustain facilities in
accordance with the primary mission of the department and in line with the Facilities Master
Plan(s). Remain adaptive and flexible to change. Complete assigned projects in a reasonable
timeline with no serious disruption to critical operations of a department.
K
ey Performance Indicators:
Mandates: Ordinance Sec. 16-31
Maintenance of Facilities Master
Plan(s) and Facilities
69 of 72
21
1. Wi
sDOT Winter Maintenance
Categories: WisDOT has five (5)
roadway categories that determine
priority, level of service, and hours of
operation. Within Walworth County,
we maintain category 3-5 level of
roads as outlined below:
C
ategory 3: All other four-lane
highways (AADT< 25,000) All lanes
and ramps will be maintained with
emphasis on plowing and sensible salting. However, the driving lanes and ramps will
receive preferential treatment. The passing lane will receive less attention. Plowing with
less salting will be done on the passing lane.
C
ategory 4: Most high-volume two-lane highways (AADT >= 5,000) and some two-
lanes (AADT < 5,000) The driving lane will be maintained with emphasis on plowing
and sensible salting.
C
ategory 5: All other two-lane highways The driving lane will be maintained primarily
by plowing with minimal salting. *AADT = Average Daily Traffic
2. P avement Surface Maintenance or Surface Maintenance: This category includes all activities
associated with maintaining and preserving the driving surface of County roadways. Work
such as crack filling, chip sealing, remediation oil treatments, and distressed pavement repair
is conducted throughout the maintenance year. Seasonal conditions dictate when each
treatment can be applied. Crack filling is typically carried out in spring and fall, when
temperatures are suitable for proper adhesion. Chip sealing and Reclamite occur during the
warm summer months when curing is most effective. Distressed pavement repair is
performed throughout the construction season and on an emergency basis whenever the road
surface deteriorates to a point where drivability or safety is affected.
3. D
itch & Drainage Maintenance: This category covers the maintenance of all roadside
drainage features, including ditching, culvert cleanouts, and culvert repairs/replacements.
Work is performed year-round, with scheduled ditching most often occurring during
warmer, drier months when soil conditions allow heavy equipment to operate safely. Culvert
replacements happen both proactively and reactively, especially following storms, washouts,
or flooding. Drainage maintenance is also conducted whenever standing water, erosion, or
roadway undermining becomes evident during inspections or after weather events.
Level of Service Clarifications
70 of 72
22
4. S
houlder Maintenance: Shoulder maintenance includes restoring gravel/asphalt millings on
paved County roadways, correcting edge drop-offs, and addressing shoulder erosion. Most
shoulder work occurs during the construction season, from late spring through fall, when
material placement and compaction can be completed effectively. Shoulder repairs also
occur immediately after heavy rains, rapid snowmelt, or traffic-related degradation.
Inspection findings throughout the year help identify unsafe shoulder conditions requiring
timely corrective action.
5. E
ncroachment Removal: Highway encroachment removal tasks prioritize the immediate
elimination of critical safety hazards in the public right-of-way, followed by the scheduled
removal of non-hazardous unauthorized objects during routine maintenance. Examples
include fallen debris, collapsed structures, illegal signage, unpermitted storage, etc.
6. S
ignage and Traffic Control Device (TCD) Maintenance: This category includes the repair,
replacement, installation, and maintenance of roadway signs and traffic control devices
across County roads. The County does not fabricate its own signs but installs and maintains
them to ensure compliance with MUTCD standards. Signage maintenance is performed
whenever signs are damaged, knocked down, faded, obstructed by vegetation, or changed
due to regulatory updates. Ensuring visibility and compliance is a year-round responsibility.
7. P
avement Markings: Pavement marking maintenance includes application and renewal of
centerlines, fog lines, and other roadway striping. Most work is performed in late spring
through summer when warm conditions support proper curing of paint materials. Additional
applications or touch-ups occur as needed throughout the season when markings fade, or
after resurfacing/maintenance projects.
8. V
egetation Management: Vegetation management encompasses all roadside vegetation work
conducted throughout the year. During the growing season, beginning in early spring and
continuing into fall, the County performs selective herbicide treatments, invasive species
control, and Plant Growth Regulator applications to manage roadside vegetation, reduce
mowing frequency, and maintain clear sightlines at intersections. These treatments are
scheduled during periods of active plant growth to ensure maximum effectiveness, but
reactive vegetation management may occur at any point in the season when overgrowth
creates visibility concerns or safety hazards. Vegetation management also includes tree
trimming and brushing operations, which occur primarily during the winter months. Winter
provides ideal conditions for this work because trees are dormant, reducing stress and
promoting healthier regrowth. Frozen ground improves equipment access to off-road
locations and minimizes damage to shoulders and ditches. During this period, crews remove
overhanging limbs, nuisance branches, dead wood, and brush that could impede visibility,
obstruct signage, threaten roadway safety, or interfere with equipment during other
maintenance operations. These trimming and brushing activities ensure long-term roadside
stability while preventing vegetation-related hazards in subsequent seasons.
71 of 72
23
9. Guardrail & Impact Attenuator Maintenance: This category includes the repair, replacement,
and upgrading of guardrails and impact attenuators throughout County roadways. Work is
performed year-round in response to crash damage, deterioration, or inspection findings.
Maintenance prioritization is based on roadway classification, hazard proximity, and safety
risk, ensuring these roadside protection systems function properly under all conditions.
10. Car Killed Deer (CKD): Car-killed deer removal is a County responsibility performed
through an approved contractor using a piggyback arrangement on the State contract.
Removal occurs as needed whenever wildlife-vehicle collisions result in carcasses within the
roadway or along the shoulder. Contractors respond promptly upon notification from
appointed County officials to maintain roadway cleanliness and eliminate hazards.
11. County Bridge Maintenance: County bridge maintenance includes the full range of activities
required to preserve structural integrity and ensure continued safe passage over
County-owned bridges throughout the year. County crews perform routine work such as
deck cleaning, joint and drain flushing, patching deck surfaces, brush cutting around
structures, removing timber or debris, and concrete repair at abutments and wing walls
whenever conditions allow. Many of these tasks are scheduled during warmer months to
support proper curing of materials, though emergency maintenance can occur at any time in
response to flooding, debris accumulation, storm damage, or issues revealed through
inspections. In addition to the work performed by internal staff, Walworth County also relies
on qualified vendors and specialized contractors when maintenance needs exceed internal
capabilities, require specialized equipment, or demand technical expertise beyond what
County crews are equipped to provide. Vendor-performed work may include larger-scale
concrete rehabilitation, structural repairs, slope stabilization projects, advanced washouts,
specialty material applications, or complex drainage corrections. Public Works coordinates
these contracted services to ensure compliance with engineering standards, regulatory
expectations, and industry best practices.
12. Preventive Maintenance (Fleet): Preventive Maintenance (PM) in fleet management refers to
the scheduled, proactive servicing of County vehicles and equipment to keep them safe,
reliable, and operational. PM includes routine tasks such as oil changes, safety inspections,
tire and brake servicing, fluid replacements, and mechanical adjustments performed at set
intervals to prevent breakdowns and extend asset life. By prioritizing PM, the County
reduces costly reactive repairs, minimizes vehicle downtime, and ensures that essential
equipment is consistently available to support daily operations across departments.