RecordWell Data

Packet

Walworth County · Walworth County · meeting of Sep 14, 2026 · Agenda packets

Open the original document More from Walworth County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

September 14, 2026 Public Works Committee Agenda SEPTEMBER 14, 2026 PUBLIC WORKS AGENDA.PDF September 14, 2026 Public Works Committee Packet SEPTEMBER 14, 2026 PUBLIC WORKS PACKET.PDF 1. Documents: 2. Documents: County Board Public Works Committee MEETING NOTICE Monday, September 14, 2026 3:30 PM County Board Room 114 Walworth County Government Center 100 W. Walworth St., Elkhorn, Wisconsin Dennis Karbowski, Chair Ken Monroe, Vice-Chair Supervisor Joe Schaefer Supervisor Rick Stacey Supervisor Bud Wojcik (Posted in compliance with Sec. 19.84 Wis. Stats.) It is possible that a quorum of the county board or any of its other committees could be in attendance at this meeting. Agenda enclosures are available upon request from the County Administrator’s Office or on the County’s web page (www.co.walworth.wi.us). A G E N D A Note: all agenda items are subject to action. 1. Call to order 2. Roll call of committee members 3. Agenda withdrawals, if any 4. Agenda approval 5. Approval of Minutes a) July 20, 2026, Public Works Committee Meeting (encl. pp. 1-4) 6. Public Comment Period 7. Special Order of Business a) Appeals/adjustments to the proposed 2027-2031 Capital Improvement Plan (CIP) (encl. pp. 5-18) b) Recommendation of the five-year CIP to the Finance Committee (encl. pp. 5-18) NOTICE: THIS MEETING IS PLANNED TO PROVIDE FOR REMOTE OR OFF -SITE ATTENDANCE BY COMMITTEE MEMBERS. THE PUBLIC CAN WATCH THE MEETING STREAMING LIVE: https://bit.ly/2026SeptPW Individuals wanting to provide a Public Comment can do so remotely by telephone but must contact the County Administrator’s Office at 262-741-4357 on the day of the meeting and at least 15 minutes prior to the start of the meeting to obtain instructions. AGENDA – Walworth County Public Works Committee Monday, September 14, 2026, at 3:30 PM Page 2 of 2 8. Consent Items (One motion and second will approve all of the following items. Any item may be pulled from the list and voted on separately) a) Reports 1) Director’s Bi-Monthly Report – September 2026 (encl. pp. 19-26) 2) Construction & Project Management Report – September 2026 (encl. pp. 27-31) 3) Report on Highway Commissioner’s Approved Project Change Order Internal Routing Approval Request for CTH-H (Williams to STH-120) Change Order #03, Project #240H1 (encl. pp. 32-33) 4) Report on the County Administrator's Approved Waiver of Competition for purchase of Burke Plow Blades (encl. pp. 34-36) 9. Unfinished Business a) E-Bike Safety, Regulation, and Policy Recommendations (encl. pp. 37-46) 10. New Business a) ATV Discussion (Multimodal Use) on White River County Trail (encl. pp. 47-48) b) Public Works Committee Priorities for Government Center Study (encl. p. 49) c) Overview of Public Works 2027 Operating Budget (encl. pp. 50-72) 11. Reports/announcements by Chairperson 12. Set/confirm next meeting date and time – Monday, October 19, 2026, at 3:30 p.m. 13. Adjournment Submitted by: Dennis Karbowski, Committee Chairperson Richard Hough, Public Works Director Posted: September 10, 2026 Public Works | W4097 County Road NN | Elkhorn, WI 53121 www.co.walworth.wi.us | (262) 741-3114 (o) | (262) 741-3117 (f) Memorandum To: Public Works Committee Cc: Mark Luberda, County Administrator From: Richard A. Hough, Public Works Director Date: September 8, 2026 Re: Sept ember 14, 2026, Public Works Committee Meeting T he following is an overview from our Public Works management team concerning items scheduled for the above -captioned Public Works Committee meeting. Should you have any questions before this meeting, please do not hesitate to contact either the appropriate manager or the Director of Public Works. S pecial Order of Business Appeals/adjustments to the Proposed 2027-2031 Capital Improvement Plan (CIP) – Mark Luberda & Richard Hough The committee will discuss any submitted appeals or adjustments to the proposed plan. R ecommendation of the Five-Year CIP to the Finance Committee – Richard Hough The Public Works Director will present a detailed breakdown of the CIP processes and critical supporting plans and answer any project-specific questions from the Committee. C onsent Items O ne motion and a second will approve all of the following items. Any item may be pulled from the list and voted on separately. C onsent Items – Reports. The following reports are included on the Agenda. No action is required unless you have questions that may be placed on file. 1) Director’s Bi-Monthly Report – September 2026 – Richard Hough 2) Construction & Project Management Report – September 2026 – Richard Hough Public Works Director’s Memorandum Page Two 3) R eport on Highway Commissioner’s Approved Project Change Order Internal Routing Approval Request for CTH-H (Williams to STH-120) Change Order #03, Project #240H1 – Richard Hough 4) Report on the County Administrator’s Approved Waiver of Competition for purchase of Burke Plow Blades – Vijay Narayanan U nfinished Business E-B ike Safety, Regulation, and Policy Recommendations – Richard Hough The intent of the discussion is to determine committee guidance on developing internal strategies for e-bike regulations within the county and to draft a resolution to send to the Wisconsin Counties Association. N ew Business AT V Discussion (Multimodal Use) on White River County Trail – Richard Hough The Director will discuss key aspects of establishing a multimodal trail on state trails. The committee will discuss the issue and determine whether guidance is needed to direct staff to pursue these aims. Pu blic Works Committee Priorities for Government Center Study – Richard Hough Director requests that you give consideration to your information priorities during the Government Center Study. The process will include future committee progress reports and then a final report. However, consider what your priorities for the study may include. O verview of Public Works 2027 Operating Budget – Richard Hough Public Works will present highlights of its 2027 operating budget to include supporting goals and objectives. /sa DRAFT Walworth County Board of Supervisors Public Works Committee Meeting Minutes Monday, July 20, 2026 Walworth County Government Center, County Board Room 114 100 West Walworth Street, Elkhorn, Wisconsin Chair Dennis Karbowski called the meeting to order at 3:30 p.m. R oll call was conducted and the following members were present: Chair Dennis Karbowski; Vice-Chair Kenneth H. Monroe; Supervisors Joseph H. Schaefer (Remote); Rick Stacey, and Bud Wojcik. A quorum was declared. O thers in Attendance County Staff: Walworth County Administrator Mark W. Luberda; Director-Public Works Richard Hough; Undersheriff Tom Hausner; Lt. Jason Rowland; Deputy County Highway Commissioner Barry Pierce; Director-Asset Management Vijay Narayanan; County Engineer Joe Kroll; Senior Project Manager Joseph Latocha; Associate County Engineer Nicole Whitman; and Project Manager Elliot Blascyk On motion by Supervisor Stacey, second by Supervisor Wojcik, the agenda was approved with no withdrawals. On motion by Vice-Chair Monroe, second by Supervisor Schaefer, the June 15, 2026 Public Works Committee meeting minutes were approved. P ublic Comment – There was none. C onsent Items (One motion and second will approve all of the following items. Any item may be pulled from the list and voted on separately) 7a . Summary Specifications & Bid Award Recommendations 1) Bid Award for Sheriff’s Office (SO) Ceiling Tile Replacement, Project #W2135 Supervisor Stacey offered a motion, second by Vice-Chair Monroe, to approve Item 7a.1. through 7b.7. and pull 7b.1. and 7b.2. Motion carried 5-0. 7 b. Reports 1) Construction & Project Management Report – July 2026 Senior Project Manager Joseph Latocha presented Terracon’s Site Investigation Results and Remedial Options Evaluation, included on Pages 12-24 of the packet. Terracon was onboarded earlier this year to evaluate path-forward options, conducting extensive site investigation and testing. Latocha outlined Terracon's two primary recommendations and reviewed the project's action plan funding, included on Pages 15-16 of the packet. Director-Public Works Richard Hough advised the Committee while additional information is required to make a final decision, supplementary funding may be necessary to move the shooting range project forward. Discussion ensued. Walworth County Administrator Mark Luberda inquired if the Committee desired a Memorandum from the Sheriff’s Office detailing project needs, options, and potential alternatives upon the item's return. The Committee confirmed they request a Memorandum 1 of 72 Walworth County Board of Supervisors July 20, 2026 Public Works Committee Meeting Minutes Page 2 of 4 from the Sheriff’s Office. In addition, Hough provided status and development updates for the following county projects: County Highway H Project (Lake Geneva), W2213 County Campus Sewer Project, and W2621 Lakeland Health Care Center Vacant Wing Modification Project. 2) D irector’s Bi-Monthly Report – July 2026 Hough referenced and provided additional information on the items on his Memorandum, included on Pages 25-33 of the packet, regarding the Department of Public Works Bi-Monthly Report – July 2026. The discussion focused on vacancies, new hires, limited-term employees, use of material and equipment, maintenance, asset management/inventories, updates t o p olicies, plans, training and leadership development, Spring/Summer maintenance season, and emergency response. Hough highlighted and discussed in detail two working group items, included on Page 26 of the packet: WG26-01 and WG 25-3. H ough referenced and discussed the importance of Chapter 18 of the Walworth County Code of Ordinances, Civil Emergencies, included on Pages 29-33 of the packet. He highlighted the ordinance must be amended to legally authorize direct support for out of jurisdiction assistance. He stated that as of Friday, the estimated and itemized bill for direct support was $165,000 to aid the Town of Geneva after the July 3 storm. Hough explained that a commitment needs to be made to go forward with assistance. Luberda explained that the issue would go to a number of committees including Executive, Public Works and Finance Committees before an ordinance is amended. He stated that after what the County went through on July 3 rd and the aftermath, it is clear the issue must be addressed. It must be addressed to ensure that all actions are consistent with the State’s public purpose doctrine. Luberda indicated that by working with the Corporation Counsel, a limit could be determined. He stated he felt comfortable extending work for two days in the middle of an emergency because the County made a commitment to assist the next week. Luberda stated he needed two days to investigate to honor the County’s original commitment and figure out his and the County’s authority. Luberda stated that the agreement with the Chair of the Town of Geneva will be consistent with the perimeters of a current Memorandum of Understanding (MOU); even though that specific MOU doesn’t apply to this storm event. Luberda explained that the County is working on the faith of the two agreements, between Luberda and the Town of Geneva Board Chair. The expectation is the Town of Geneva will get the 70/30 funding from the state. He stated the County has to figure out a long term plan. The County has to have parity on how individual municipalities are treated. Luberda stated that internal work with Public Works and the Corporation Counsel will be done to determine what the perimeters are for the County; and to what extent we are allowed legally to assist the municipalities. He indicated these items will be framed during budget discussions. 3) R eport on Highway Commissioner Approval of One-Time Cooperative Purchase over $100, 000 for the Purchase of Road Salt 4) Report on Highway Commissioner Approval of One-Time Cooperative Purchase over $100, 000 for the Purchase of Bulk Solar Salt 5) Report on the Highway Commissioner’s Approved Bid Award for Concrete Bridge R epairs, Project #26-059 2 of 72 Walworth County Board of Supervisors July 20, 2026 Public Works Committee Meeting Minutes Page 3 of 4 6) Department of Natural Resources (DNR) Compliance Maintenance Annual Report (CMAR) on the County Campus Wastewater Sewage Collection System 7) Report on the County Administrator’s Approved Project Change Order Internal Routing A pproval Request for Lakeland Health Care Center (LHCC) Building Renovations, Change Order #10, Project #W2306 U nfinished Business 8a. 2027 Budget Ideas or Considerations Luberda stated Item 8a. is an open-discussion item where Supervisors can propose ideas or programs that the County Administrator could consider in the development of the 2027 budget. Chair Karbowski stated he wants to ensure we have funds available for the type of emergency type situation that happened on July 3, 2026. Luberda indicated he did have a conversation with the Finance Director, and it may be possible to expand the definition of the emergency fund so that if Public Works has bad weather events; there will be an extra pile of money that the Finance Committee can free up without having to go to the full County Board or the need for a two-thirds majority. Hough and Associate County Engineer Nicole Whitman discussed Supervisor Schaefer’s idea of using solar power for energy and selling solar energy to local municipalities. They discussed the history of studies done on this issue and the lack of cost savings being determined. N ew Business 9a. Annual Committee Review of Standardized Equipment, Systems, & Materials Hough referenced and discussed highlights of his supporting Memorandum and the Annual Committee Review of Standardized Equipment, Systems, & Materials, included on Pages 51-52 of the packet. Supervisor Stacey offered a motion, second by Supervisor Wojcik, to approve Item 9a. Motion carried 5-0. 9b . E-Bike Safety, Regulation, and Policy Recommendations Hough referenced his Memorandum, included on Pages 53-56 of the packet. Hough noted that E-bikes function like motorcycles but lack registration requirements. He highlighted that confusion regarding E-bike traffic laws, similar to ATV regulations, makes enforcement difficult. He stated a message will be relayed to municipalities to establish local rules at this week's municipal engagement meeting. Chair Karbowski expressed his concern over the lack of regulations for the use of E-bikes. He discussed his safety concerns and how he would like t o s ee Walworth County become the leading edge on this issue the same way Walworth County wrote rules for ATV/UTV rules. Chair Karbowski would like to see an ordinance drafted to reg ulate E-bikes usage and the ordinance be submitted to the Wisconsin Counties Association to help establish statewide consistency. Chair Karbowski offered a motion, second by Supervisor Wojcik, to request an ordinance be drafted to regulate E-bikes for Walworth C ounty to send to the Wisconsin Counties Association (WCA). Motion carried 5-0. 9c . Approval of One-Time Cooperative Purchase over $100,000 for the Purchase of Sewer Vacuum Hydro-Excavation and Municipal Pumping Equipment with Related Accessories and Supplies, Project #26-030 3 of 72 Walworth County Board of Supervisors July 20, 2026 Public Works Committee Meeting Minutes Page 4 of 4 Supervisor Wojcik offered a motion, second by Supervisor Schaefer, to approve Item 9c., Approval of One-Time Cooperative Purchase over $100,000 for the Purchase of Sewer Vacuum Hydro-Excavation and Municipal Pumping Equipment with Related Accessories and Supplies, Project #26-030. Motion carried 5-0. 9d . Approval of One-Time Cooperative Purchase over $100,000 for the Purchase of Two (2) ADA Bariatric Vehicles, Project #W2536 Supervisor Schaefer offered a motion, second by Vice-Chair Monroe, to approve Item 9d., Approval of One-Time Cooperative Purchase over $100,000 for the Purchase of Two (2) A DA Bariatric Vehicles, Project #W2536. Motion carried 5-0. 9 e. Project Change Order Internal Routing Approval Request for Radio Tower Site Construction, Change Order #07, Project #23-027 Vice-Chair Monroe offered a motion, second by Supervisor Wojcik, to approve Item 9e., the Project Change Order Internal Routing Approval Request for Radio Tower Site Construction, Change Order #07, Project #23-027. Motion carried 5-0. 9 f. Res. No. ** - 08/26 Authorizing Budget Amendment Increasing Lakeland Health Care Center (LHCC) Building Renovation Project with Contingency, LHCC Administrative Area Carpeting and Paint Project Decrease, LHCC Building Reserves, and Acceptance of Additional Focus on Energy Credits Vice-Chair Monroe offered a motion, second by Supervisor Schaefer, to approve Item 9f., the resolution Authorizing Budget Amendment Increasing Lakeland Health Care Center (LHCC) Building Renovation Project with Contingency, LHCC Administrative Area Carpeting and Paint Project Decrease, LHCC Building Reserves, and Acceptance of Additional Focus on Energy Credits. Motion carried 5-0. Reports/Announcements by Chairperson – There were none. C onfirmation of next meeting date and time: The next meeting was confirmed for Monday, September 14, 2026 at 3:30 p.m. A djournment On motion and second by Vice-Chair Monroe and Supervisor Stacey, Chair Karbowski adjourned the meeting at 4:33 p.m. _________________________________________________________________________________ Submitted by Kathleen Aukland, Administrative Assistant. Meeting minutes are not considered final until approved by the Public Works Committee at the next regularly scheduled meeting. 4 of 72 ROLE OF PLANS/PLANNING PLAN OVERVIEWS GC PROJECTS PROJECT OVERVIEW VEHICLES PAVEMENT STRATEGY IMPACTS 5-YEAR COMPARISON 5 of 72 10-YR EQUIPMENT PLAN 10-YR ROAD/BRDG PLAN 25-YR ROAD MAINT PLAN “Plans are nothing; planning is everything.” – Dwight D. Eisenhower FACILITIES MASTER & SECURITY PLAN (2021) 10-YR PAVEMENT PLAN BLDG STUDIES BUILDING ASSESSMENTS (ALL MAJOR FAC.) Condition Assessment PASER / Bridge Insp. PASER Parking Lot Assessments FACILITIES MEP SYSTEMS LIFECYCLE TRACKER 2025 6 of 72 Scheduled Assessments: • JC (2003) Building Assessment in 2027 will inform ne ar- and long-term capital plans as major systems, from elevators to generators, enter their early life-cycle replacement windows. • SO Kitchen Assessment in 2027 by SMEs will inform th e department on the rooms’ deterioration and mitigation requirements. • SO (1995) Building Infrastructure Assessment in 20 28 will provide an analysis of major systems as this building enters its mid-life cycle. • CDEB (2006) Building Infrastructure Assessment in 20 30 precedes major investments in roofing, pavement, and HVAC systems. • HHS (2018) Building Infrastructure Assessment in 20 30 precedes initial review of major systems to inform MEP and systems placement on future CIPs. Why and How? Facilitated by subject matter experts, building assessments provide a clear understanding of facility conditions, system performance, and code or safety issues. They help identify risks, prioritize repairs, and plan capital investments. Facilities managers use assessments to forecast maintenance needs, budget accurately, extend asset life, and align projects with organizational goals. By relying on objective data, they ensure resources are allocated effectively, projects are timed appropriately, and long-term facility strategies remain proactive rather than reactive. Combining external assessments with employee observations provides decision-makers with the best overall picture of what is required versus desired. BUILDING ASSESSMENTS & STUDIES 7 of 72 Why and How? Parking lot and pavement improvement plans are tightly linked to follow-on maintenance activities that preserve structural integrity, extend surface life, and reduce long-term costs. Treatments such as crack filling and reclamite slow deterioration, protect prior investments, and maintain safe, functional facilities. Coordinating capital improvements with routine preservation ensures predictable performance, supports budgeting accuracy, and enables DPW to manage lifecycle needs proactively rather than reactively. This year’s 10-Year Maintenance Average for all lots is approximately $42K. PARKING LOTS PLAN LOT Overall asphalt ft2 Overall concrete ft2 Other Total ft2 # C e t Y e a Current Year 2027 2028 2029 2030 GC 43,511 18,038 900 62,449 S p o Crack Fill Spot Repair / Seal Coat GC RADIO TOWER 20,641 1,110 21,751 Seal Coat HHS 128,706 21,825 150,531 Recla Crack Fill Reclamite HHS - Overflow 24,650 24,650 PAINT ONLY NO INTENDED MAINTENANCE - too far gone to spend money until Resurfacing Lot A 74,377 Reclamite Crack Fill Lot B 46,199 Lot C 9,215 Lot A 124,532 Reclamite Crack Fill Lot B 32,797 Reclamite Crack Fill LAKELAND SCHOOL 176,785 18,245 195,030 R e s Reclamite Crack Fill Lot A 46,419 a Crack Fill Reclamite Lot B 72,914 Lot C 70,025 Lot D 40,832 N O NO INTENDED MAINTENANCE - too far gone to spend money until Resurfacing Lot E 20,687 a Crack Fill Reclamite All the Rest 341,325 Entry Road 38,362 aC Reclamite Crack Fill SO RANGE* 13,538 4,965 18,503 Recla Crack Fill Reclamite Lot A 7,376 Lot B 5,684 PRICE PARK 33,000 Seal Coat PRICE PARK SERVICE ROAD** 17,500 Engineering $ Resurface BURN PIT ROAD 24,000 v WHITE RIVER PARK* 22,000 Engineering $ JC 129,791 Reclamite Spot Repair / Seal Coat 265,405 Crack Fill C r a c k S o t e Crack Fill LHCC 157,329 LEC (SO) 250,877 R e s u r f 10,212 1,044 141,047 29,576 175 187,080 14,528 NATURELAND PARK 13,060 R e s u r f Reclamite Crack Fill Misc Reclamite ResurfacingC I P DPW 379,687 29,941 409,628 NO INTENDED MAINTENANCE NO INTENDED MAINTENANCE NO INTENDED MAINTENANCE $1.30/SY 33,000.00$ $10/ft2 (4% inflation) 48,000.00$ 6,000.00$ 540,000.00$ 6,000.00$ 35,000.00$ 4,500.00$ 2,000.00$ 12,000.00$ 6,000.00$ 15,000.00$ Tentative Annual Maintenance Budget for Reclamite, Crackfill & Chip Seal/Spot Repair/Re-paint $ based on Cost/ft2 for Seal Coat + Highway re- paint 49,000.00$ 58,500.00$ 21,000.00$ CrackFill Slurry Seal Coat $3,000/day - Highway crew Will be based on visual inspection Based on lot size & gallons of paint 4,000.00$ 4,500.00$ Re-Paint Spot Repair 10,500.00$ 3,250.00$ 69,250.00$ 9,000.00$ 20,000.00$ 8 of 72 PASER (2025 Bi-Annual Analysis): 6.89 NOTE: The ordinance below defines levels of 7.0 Hot-in-place road treatments recycle existing pavement to restore ride quality and extend service life at lower cost. When paired with Highway Safety Improvement Program funds, agencies can enhance surface conditions and safety while protecting capital investments. Integrating these treatments into our long-range road strategies helps maintain a consistent 30–35-year lifecycle by delaying major reconstruction, reducing deterioration, and supporting cost-effective, data-driven pavement management. RISKS: The plan seeks two competitive federal grants (STP-Rural) to support 9.4 miles of roadway. One grant is secured, and the other is pending approval. HWY PROJECT NAME CL MI PASER + FUNDING 2027 2028 2029 2030 2031 6 Design Yr. 3 Construct 5 $0 $4,467,000 4 Construct 4 $1,206,000 6 Construct 5 $1,666,000 5 Pre-Design Design Construct 4 $25,000 $130,000 $1, 304,000 RE Purchase $0 Design Yr. 2 Design Yr. 3 Construct $0 $0 $500,000 RE Acquisition RE Purchase $40,000 $30,000 6 Design Yr. 1 Design Yr. 2 Construct 4 $238,000 $0 $3,326,000 6 HIR 5 $389,000 5 HIR 5 $156,000 6 HIR 5 $428,000 5 HIR 5 $117,000 4 Pre-Design Design Construct 3 $40,000 $150,000 $1,237,000 5 Design Yr. 1 Design Yr. 2 Design Yr. 3 Construct 3 $326,000 $0 $0 $3,870,000 Design Construct $75,000 $600,000 Pre-Design Design Construct $60,000 $309,000 $2,656,000 5 Corridor Study Pre-Design Design Construct 3 $25,000 $30,000 $321,000 $4,315,000 5 Pre-Design Design Construct 3 $15,000 $105,000 $749,000 5 Corridor Study Pre-Design Design 3 $25,000 $30,000 $378,000 Hwy Assessment $175,000 6 Corridor Study Pre-Design 4 $25,000 $30,000 5 Application Yr SMA Design Yr. 1 3 $573,000 7 Pre-Design 4 $20,000 $4,706,000 $5,462,000 $6,746,000 $7,182,000 $6,065,000 -$237,228 -$225,000 -$225,000 -$236,182 -$240,000 -$240,000 -$696,751 -$690,000 ------> -$3,304,102 -$3,000,000 -$433,856 $3,535,839 $2,157,898 $5,157,144 $4, 182, 000 $5,600,000 $12,604,685 $12,213,846 $13,265,948 $11,383,804 $10,541,804 FUND BALANCE: $9,068,846 $10,055,948 $8,108,804 $7,201,804 $4,941,804 $4,126,576 STH-67 to STH-50 (3R Req'd) 1.0 CTH-C Salt Box Rd. to Martin St. 1.0 Whitewater Lake Dam - Study ALL 6.9 (2027-2031) 5-YEAR AVERAGE w/ Inflation: ESTIMATED CHI-D: 5.2 LRIP CTH-C State Line Rd to STH-67 CTH-L VARIOUS Bridge Repairs N/A CTH-U to Kenosha Co. LineCTH-B I-43 to Delavan City Limits CTH-J to Waukesha Co. Limits CTH-O CTH-P (south) to CTH-H CTH-B Linton Road to STH-120 (3R Req'd) S. County Line to USH-14 (3R Re q'd) System-Wide Highway Assessment LRIP STP-R Candidate PROJECTED TOTALS: ESTIMATED CHI: Other-Muni Reimburse / LRIP-S: (Includes 4% Inflation) TOTAL w/AID: N/A 3.0 CTH-K WW DAM CTH-M to CTH-A (3R Req'd) PROJECTED FUNDING: 5.9 LRIP-S 1.1 CTH-B Replace V64041, V64042, V64043 N/A CTH-E USH-12 to CTH-A 1.7 CTH-J to Waukesha Co. Limits Stone School Rd Real Estate - Vision Easements 1.7 1.0 N/AStone School Rd Real Estate - Vert. Realignment 0.3 0.7 LRIP-S STH-120 to Ausitn St.CTH-G 4.6 CTH-L CTH-L CTH-L HSIPN/A N/A Stone School Rd Vertical Realignment STP-R Candidate STH-20 to Racine Co. Line CTH-DD CTH-JS to CTH-D STP-R4.8 LRIP-S CTH-A 4.8 CTH-ES LOCAL PROGRAM - HSIP: CTH-F LOCAL PROGRAM - STP: CTH-P LRIP-S CTH-A LRIP CTH-I CTH-B County Line to CTH-C 2.6 LRIP CTH-H to USH-12 0.4 9 of 72 Why and How? Road improvement plans and follow-on maintenance activities are inseparable parts of a long-term pavement management strategy. Initial reconstruction or resurfacing establishes structural integrity, while treatments like crack filling and chip sealing slow deterioration, reduce lifecycle costs, and extend service life to our desired 30- to 35-year reconstruction goal. When planned together, they optimize budgeting, preserve prior investments, and maintain safe, reliable transportation networks. This coordinated approach ensures predictable performance, protects assets, and supports sustainable, data-driven infrastructure planning. For the Department, we seek to average $500K in road maintenance costs using this treatment strategy. This year’s 5-Year Maintenance Average is approximately $492K. In addition, we’ve been provided with a new $1M boost to the Highway & Bridge Fund specific to small culvert repairs after recent inventories identified 55 structures in poor condition. HWY From To CL Mile C U R CURRENT 2027 2028 2029 2030 2031 Rock County Line CTH - P 5.8 R e Reclamite Crack Fill CTH - P HWY 67 6.3 C rCTH - P CTH - H 4.6 Resurface CTH - H HWY 12 1.7 Resurface HWY 67 CTH - ES 4.9 Chip Seal Crack Fill CTH - U Kenosha Cty Line 0.9 HIP Crack Fill HWY 120 Gregory Dr 6.2 Chip Seal Crack Fill Gregory Dr Walworth St 0.6 Reclamite Crack Fill Castle Terrace Linton Rd 2.6 a Crack Fill Linton Rd HWY 120 5.3 Resurface CTH - C Rock County Line 2.7 C Resurface Reclamite Crack Fill HWY 67 CTH - X 5.8 USH 14 USH 14 3.6 Reclamite Crack Fill N Sharon Limit CTH - X 5.6 R e Reclamite Crack Fill State Line HWY 67 1 Salt Box Rd Martin St 1 Resurface CTH - D CTH - ES County Line 8.5 C r Chip Seal Crack Fill CTH - DD CTH - JS CTH - D 5 Resurface Reclamite CTH - E CTH - J Waukesha County Line 1 HIP Crack Fill HWY 12 West St 6.8 Chip Seal Crack Fill West St HWY 20 2 C r Reclamite HWY 12 CTH - A 1.7 Resurface Reclamite Crack Fill HWY 20 County Line 4.5 Chip Seal Crack Fill Little - ES HWY 12 CTH - D 4 HWY 67 HWY 50 4.2 HWY 50 HWY 11 2 CTH - G STH 120 Austin St 0.7 Resurface Elkhorn NN Lake Geneva NN 6.6 Elkhorn CTH - A 4.5 Reclamite Crack Fill CTH - A HWY 12 4.5 Chip Seal Crack Fill HWY 12 Jefferson County Line 3.2 Resurface Reclamite Crack Fill HWY 120 Freeman St (Genoa City) 6 Reclamite Crack Fill Williams St HWY 120 0.6 Resurface Reclamite Crack Fill CTH - I CTH - J Waukesha County Line 0.25 HIP Crack Fill CTH - J HWY 20 CTH - ES 10.4 Chip Seal Crack Fill CTH - JS HWY 11 Racine County Line 1.4 Chip Seal Crack Fill State Line USH 14 5.9 USH 14 CTH - X 2.5 C Crack Fill CTH - L STH 20 County Line 4 Resurface CTH - M HWY 89 CTH - P 5.7 C Crack Fill CTH - ES HWY 20 1 Chip Seal Crack Fill HWY 20 CTH - J 1.61300' East of Bray Road E County Campus Limits 1.25 Crack FillE County Campus Limits CTH - H 6 Chip Seal Crack Fill HWY 11 CTH - A 5 C r Chip Seal CTH - A HWY 12 4.5 Reclamite Crack Fill Delavan City Limits I43 0.4 HIP Crack Fill USH 14 I43 3.7 Reclamite Crack Fill CTH - M CTH - A 6.5 Chip Seal Crack Fill CTH - A HWY 12 6 Chip Seal Crack Fill CTH - U CTH - B Kenosha County Line 4.7 C r Reclamite CTH - X Delavan County Line 5.3 Reclamite Crack Fill 3.7 8.7 16.1 14.9 4.4 11.7 84,656.00$ 199, 056.00$ 368, 368.00$ 340, 912.00$ 100, 672.00$ 267,696.00$ 10.8 23.45 27.15 34 22.5 11.2 $ 21,600.00 $ 46,900.00 $ 54,300.00 $ 68,000.00 $ 45,000.00 $ 22,400.00 18.5 15.9 17.9 7.6 6.8 5 $ 314,500.00 $ 270,300.00 $ 304,300.00 $ 129,200.00 $ 115,600.00 $ 85,000.00 # 2026 2027 2028 2029 2030 2031 33 48.05 61.15 56.5 33.7 27.9 Assumptions: CTH - B CTH - A CTH - N - again at year 10 of cycle $ 375,096.00 $ 516,256.00 $ 726,968.00 CTH - K $ 261,272.00 ***NEED TO INCLUDE THE JAIL TRAIL IN THIS PLAN*** CTH - C CTH - ES CTH - H $ 538,112.00 CTH - P CTH - NN CTH - O CTH - F Reclamite Chip Seal CrackFill $ 420,756.00 Tentative Annaul Maintenance Budget for Rejuvenation Treatments, Chip Seal & Crackfill Annual Avg 17k/CL Mile** Annual Avg 2k/CL Mile $1.30/SY Total Maintenance Mileage Reclamite is the first treatment in the rejuvenation process - ideal at year 3 of life 10-YR PAVEMENT PLAN 10 of 72 11 of 72 DEPT DESCRIPTION YEAR(S) TOTAL BUDGET NOTE: DPW JC Renovations 2029 2030 $600,000 (D) $5,000,000 (C) Remodel the Judicial Center to allow for better utilization of building space due to division relocations within the building and the relocation of courtrooms. DPW JC Window Renovations 2030 2031 $75,000 (D) $1,000,000 (C) Exterior insulated windows are original (2004) and nearing their estimated service life of 25 years. DPW JC Elevator Renovations 2029 2030-31 $60,000 (D) $1,700,000 (C) Planned rehabilitation or replacement is needed to ensure ongoing business operations and meet code compliance requirements for the public facility. Planned as 2 units per year, with design in the prior year. SO 911 Comms Center 2028 2029 $800,000 (D) $7,200,000 (C) Whitewater, UWW , and City of Lake Geneva could consolidate dispatch to the county per county ord. 2-193. Add'l communications officers & support staff will also be needed. Recommend a multipurpose facility to address SO/ME requirements. SO LE Center Remodel 2028 2029 180,000 (D) $1,800,000 (C) LEC remodel as a result of the organizational, 911, and Law Enforcement Center building studies. Project includes refurbishing employee locker/toilet room, admin area flooring replacements, patrol office remodel, and kitchen infrastructure repairs. SO Property Barn Expansion 2029 2030 $150,000 (D) $1,500,000 (C) Expand the property storage warehouse for SO's equipment. CDEB Corridor Flooring 2028 2029 $55,000 (D) $1,500,000 (C) Replace the original 2008 patterned corridor tiling with a new flooring solution. Current stockage for repairs and replacements is minimal. 12 of 72 DEPT DESCRIPTION YEAR(S) TOTAL BUDGET NOTE: LHCC Vacant Wing Modification 2027 $4,000,000 (D&C) Awaiting notification on a $1M CDS grant which is likely to be formalized later this month. LHCC North Parking Lot 2027 $1,000,000 (D&C) Lot deteriorating at rapid rate and requires rebuilding base material LHCC Exterior Siding 2029 2030 2031 $50,000 $250,000 $2,000,000 Residing facility at approximate life-cycle of windows and siding. Assessment in 2029 will validate scope of work required. DPW DPW Parking Lot Replacement 2028 2029 $600,000 $5,400,000 Public Works parking lot is in poor to fair condition. Project will also address the access road on the east side of the compound. DPW Cold Storage Facility 2028 2029 $100,000 $1,300,000 Demolition of smaller huts and construction of a larger facility to bring most of the departments’ vehicles under a shelter to facility life-cycle objectives. 13 of 72 DEPT DESCRIPTION YEAR(S) TOTAL BUDGET NOTE: DPW JC Heating Boiler Replacement 2027 2028 $60,000 (D) $850,000 (C) NOTE: JC is entering a significant systems transition period for the next several years as major system reach initial life-cycles. SO Jail Dorms H&L Mech. Upgrades 2028 2029 $70,000 (D) $1,000,000 (C) Original 2002 Huber dorms chiller, boiler, boiler pumps, and hot water system replacement. CDEB Chiller and Partial Roof Replacement 2027 $765,000 (C) Replace the chiller system at the end of its life (20 years). Replace kitchen cooler and freezer evaporators and condensers at the end of life (20 years). LHCC Chiller Replacement 2027 2028 $50,000 (D) $500,000 (C) Chillers (2006 Trane; 2012 Daikin) are approaching or have exceeded their service life (estimated at 15 years). Replace both units with one (1) multi-stage chiller unit sized to meet the building specifications. DPW VMF HVAC Equip. Upgrade 2030 2031 $40,000 (D) $500,000 (C) Approximate replacement window based on anticipated system life-cycles. NOTE: VMF entering its initial window of life-cycle repairs 14 of 72 DEPT DESCRIPTION YEAR(S) TOTAL BUDGET NOTE: DPW Tandem Axle Patrol Truck Replacements 2027 2028 2029 2030 2031 $528,500 $1,710,000 $1,217,500 $1,298,000 $473,000 Replacement cycle is 1, 3, 2, 2, and 1. NOTE: All primary plows will be equipment with multi-generational brine tank inserts by 2030 resulting in lower future costs for new plow trucks. DPW Grader 2027 $240,000 Grader will be smaller than existing vehicle as the department seeks to field mission appropriate equipment while lower overall life-cycle costs DPW Excavator Replacement 2030 $540,300 Replacement of excavator based on Highway Equipment Plan or approximately 20 years of service life. 15 of 72 16 of 72 Year Previous $ Current $ Difference MAJOR CHANGES Budget 2027 $15,415,430 $19,497,030 $4,081,600 CDEB Chiller & Partial Roof Rep Moved Up 911 Communications Center $765,000 ($800,000) 2028 $29,354,990 $27,327,190 ($2,027,800) GC Remodel CDEB Chiller & Partial Roof Rep Moved Up 911 Communications Center $5,225,000 ($765,000) $800,000 ($7,200,000) 2029 $16,720,388 $34,568,068 $17,847,680 911 Communications Center West Playground Replacement DPW Parking Lot (Moved Up) Increase Dorm Remodel Costs Property Barn Expansion $7,200,000 $635,000 $5,400,000 $500,000 $1,500,000 2030 $26,415,464 $24,401,604 ($2,013,860) Deleted Loader Request ($356,200) 2031 $14,956,391 $15,477,191 $520,800 Reduced LHCC Window Budget ($2,000,000) 17 of 72 For road infrastructure projects, we've used a 4% inflation factor, while we’ve calculated vehicles at 3%. For rebidding lapsing contracts at 3–6 years, we've generally applied an inflation factor of 10% to 20%. For all other categories and for many previously scheduled CIPs, especially where material requirements are significant, we've used approximately 6%. 18 of 72 Public Works | W4097 County Road NN | Elkhorn, WI 53121 www.co.walworth.wi.us | (2 62) 741-3114 (o) | (262) 741-3117 (f) M emorandum To: Public Works Committee Members Cc: Walworth County Administrator – Mark Luberda From: Public Works Director – Richard Hough Date: September 6, 2026 Re: Department of Public Works Bi-Monthly Report – September 2026 Thi s correspondence provides a bi-monthly update on multifaceted topics related to the Department of Public Works. Human Resources Topic What When Remarks New Hires (FTE) 1 / 1 1 Groundskeeper / 1 Intern FTE Vacancies 2 January 1 Electrician; 1 Hightway # of LTEs (OH) PARKS: 5 September Remarks: Department has a separating U.S. Navy Skillsbridge® program member through mid- January. Material & Equipment Prior Year Fuel Comparison (Qtr) Diesel (1,118); Unleaded 239 Pending Procurements (CIP) Lift Controls, Tire Balancing Machine, DPW Garage Doors Surplus / Disposed Equipment Remarks: Delivery of 2800 tons of solar salt. The department sustained reduced diesel fuel use over the same quarter as the prior year. Ma intenance Recent PMCS Activities 1 September Critical Equipment Deadline N/A Remarks: The fleet maintenance program is about two weeks behind schedule but is expected to catch up next month. 19 of 72 Subject: Bi-Monthly PW Report Asset Management / Inventories WHAT WHEN REMARKS VMF Parts SEPT NCA Highway Maintenance Worker's Tool Cabinets OCT Handheld Portable Radios OCT Capital Asset Inventory (Fleet, Radios, Equipment) OCT/NOV Year-end capital inventory P olicy & Doctrine (+/- Two Month Window) Level Topic Remark Effective Internal Traffic Operations Policy Three-Year Review Complete Internal Strategic Asset Management Plan Three-Year Review Complete Internal Misdirected Emergency Calls Policy New Complete Internal Department Safety Program Three-Year Review Pending Internal Facilities Security Assessment Policy Three-Year Review Pending Internal Leadership Development & Supervisory Training Three-Year Review Pending Internal Highway Asset Management (Signs) Three-Year Review Pending Internal WISLR Utilization Policy Three-Year Review Pending Internal Capital Asset Management Three-Year Review Pending Internal Consumable Supplies Policy Three-Year Review Pending Internal Office Supply Policy Three-Year Review Pending P lans, Training & Leadership Development (+/- Two Month Window) Category Title Who When Remarks WG 26-01 Parks & Open Space Plan Rich Hough Jan 26 – Jan 27 Municipal and Conservation Group Outreach Updates (Ongoing) WG 25-1 AssetWorks WG Sarah Arndt Sep 25 – Sep 26 Moving to a quarterly meeting; focus shifting to GIS integrations. WG 25-2 Key Performance Indicator Development Rich Hough Sep 25 – Sept 26 Developing KPIs to outline operational performance in the resource requirements to sustain WG 25-3 COOP/COG Update Rich Hough Sep 25 – Jan 27 Develop five department contingency plans 20 of 72 Subject: Bi-Monthly PW Report Spring/Summer Maintenance Season Maintenance Item Planned Completed Crackfill C/L Miles – State 103 75.7** Crackfill C/L Miles - County 47 28.4 Chip Seal Miles 18.9 18.9 Bridge Maintenance Items - State 36 21 **Bridge Maintenance Items - County 6 - Ditch Maintenance - County Odd Years Roadside Mowing Planned Completed *State Routes 13 6 (1205 Hours) County Routes - 1st run 10 10 (657 Hours) County Routes - 2nd run 10 - *Owing to vision issues, this will occur moving forward as we determine how the spraying affected State ROW growth. Meanwhile, the complete route estimate is based on vision mowing that has occurred. **DMA Work (IN TENTIONALLY LEFT BLANK) 21 of 72 Subject: Bi-Monthly PW Report Complaint / Notification Log Date Received Last Name Fir st Name Address (if known) Residency (Associated Township) Nature of Complaint Forwarded to Act ions We Took 2-Jun-26 Blise Barb To wn of East Troy STH-120- large holes, pieces of concrete laying on 120 when turing S from Honey Creek Rd D Woodhouse 15-Jun-26 Alan 966 Mai n St Village of Genoa City tree fell in his driveway. He was told last year it is in our ROW. After looking at GIS, that will be looke d at again tomorrow to determine who is responsible. D Woodhouse Dale is on vacation, Woody looking at this. Completed 6/16 15-Jun-26 Amanda 8690 Ber onja Rd/CTH-L Town of East Troy Tree fell from across the road from Beronja in April. Our trucks cleaned it up and left big ruts in Be ronga ditch. D Woodhouse Dale is on vacation, Woody looking at this. Completed 6/16 15-Jun-26 Carmen 4130 CTH -ES Town of LaFayette fix mailbox from winter hit. D Poggensee Dale is on vacation, Woody looking at this. Completed 6/16 15-Jun-26 Garwood Mary corner of Sweet Rd/CTH- K Town of Darien vision issue, Sweet Rd/CTH-K - tree fell from storm D Woodhouse D Woodhoiuse took care of issues 6/16 15-Jun-26 Struck Ken Li nton airport Town of Linn CTH-B culvert D Woodhouse ends cleaned and inspected. 6/16 16-Jun-26 Weber Aman da N1751 N Daisy Dr Town of Bloomfield her back yard butts up to US12. In 2025 a vehicle went through the fence. Would like the fen ce fixed 262-206-4177 D Woodhouse 6/18 fence is repaired 7-Jul-26 Michael N7048 CT H-DD we have filed hole before, continues to open up when it rains. Needs something done to fix it Rec ently, person went into the ditch. Got out of car and fell into the hole, did sustain injury. D Poggensee 7-Jul-26 Harvey STH-20/CTH-ES tree limb from Oak Ridge cemetary fell ito our ROW. Look to make sure it' s ours. 262-642-2526 D Woodhouse do after Como is done, need excavator to move limb 7-Jul-26 Nelson Stev e W4801 CTH-ES Town of LaFayette When road work was done, tree roots where hit and now tree is dying. Limb in our ROW D Poggensee cleaned up limb. Not our tree 14-Jul-26 voicemail, no name CTH-H - sink hole between CTH-A and Voss Rd. Was filled in a few months ago but has reope ned. D Poggensee 7/15 filled 20-Jul-26 Mary N1087 Cobblestone/CTH-B Town of Walworth tree on B side of house. Dead oak ready to fall. Ours or hers to cut down? 707-330-5854 D Poggensee not our tree 7/21 22-Jul-26 Tony N716 Br ink Rd/CTH-B Town of Linn driveway is on CTH-B. Approx 1/8 mile E of intersection is driveway. Our mower mowed over t he apron and hit culvert. Would like it fixed so it doesn't continue to get hit and get worse. D Poggensee 22-Jul-26 Schmidt Alyc e W303 CTH-JS Town of Spring Prairie Johnson Sand & Gravel turns around in her driveway every week with street sweeper, has rui ned her driveway and road. Look at to see what needs to be fixed, what's damaged. D Poggensee gravel driveway. Road edges fixed with cold patch. Dale cont acted Johnson Sand and asked to have sweeper person turn around in another location. 22-Jul-26 Town of Geneva vis ion issue at CTH-H/Pinecrest Ln D Poggensee mowed 7/23 29-Jul-26 Bridgett 4106 Mapl e Dr Town of Delavan side of her home runs along CTH-O. Tree is leaning along O, believes it is our ROW D Poggensee Per Dale, not our tree to take care of. 30-Jul-26 Justin N2804 ST H-67 Town of Delavan ditch vision issues at adress D Woodhouse 5-Aug-26 Vickie Gla dhurst Subdivision Town of LaGrange 12/67 and Gladhurst Ln - sink hole on west side of road D Woodhouse 7-Aug-26 Helen CTH -P, south Town of Darien corner of CTH-P/M vision issue, corn is blocking vision D Poggensee Per Dale, no vision issue. Drivers must square up to sto p sign and they can see. 11-Aug-26 Ken W1529 CT H-B Town of Bloomfield branches have fallen. tree may be dead, his or ours to cut? 773-251-9331 D Poggensee 13-Aug-26 Smyth Tom 1407 St ate St City of Delavan Why are we putting gravel over CTH-O instead of repaving it? Why woiuld we turn it into a gra vel road? B Pierce Responded to Tom - We are chipsealing, not turinging it int o a gravel road. 14-Aug-26 Levy Kim W3148 S pringfield Rd Town of Geneva We are chipsealing - multiple trucks used her newly fixed drivway to back in and turnaround. Pict ures were sent. Wants driveway fixed D Poggensee fixed driveway 8/18 17-Aug-26 Travis Eil een N1910 CTH-K Town of Sharon they are cutting trees in their yard, several are dead and they didn't realize it. Several are leavi ng toward the road. Are the ones leaning ours or hers? D Poggensee Not our tree 8/18 25-Aug-26 Marino Mark 390 C TH-B Village of Fontana ditch has not been mowed yet. When is it being done? Normally done by now D Poggensee 22 of 72 Department Available Budget-Operating Budget Only* 550 Fund 2026 August 14, 2026 Operating Budget Activity Revised Budget Actuals Encumbered Available Available % Expense* Highway Administration 734,682.00$ 432, 275.18$ 152. 65$ 302, 254.17$ 41. 14% Highway Supervision 673,600.00$ 374,127.70$ -$ 299, 472.30$ 44. 46% Fleet Operations 483,934.00$ 221,314.34$ 110. 85$ 262, 508.81$ 54. 24% Field Small Tools 49,375.00$ 20,229.72$ 4, 709.56$ 24, 435.72$ 49. 49% Brine Operations 159,210.00$ 49,817.03$ -$ 109, 392.97$ 68. 71% Fuel Handling 31,632.00$ 19,992.68$ -$ 11, 639.32$ 36. 80% Machinery & Equipment 2,395,350.00$ 1,197,487.29$ -$ 1, 197,862.71$ 50. 01% Fleet Staff Payroll 867,410.00$ 466,146.81$ -$ 401, 263.19$ 46. 26% Salt Sheds 43,933.00$ 30,376.37$ -$ 13, 556.63$ 30. 86% DPW Building Complex 622,023.00$ 193,601.21$ 20, 775.98$ 407, 645.81$ 65. 54% Vehicle Maintenance Facility 189,668.00$ 101,021.87$ 5, 854.75$ 82, 791.38$ 43. 65% Projects 5545-5540 300.00$ -$ -$ 300. 00$ 100. 00% Highway Staff Payroll 3,936,188.00$ 2,300,356.41$ -$ 1, 635,831.59$ 41. 56% State Routine Maintenance 1,347,525.00$ 796,769.49$ -$ 550, 755.51$ 40. 87% State Winter Maintenance 1,187,398.00$ 763,530.61$ -$ 423, 867.39$ 35. 70% State Damage Claims 155,629.00$ 60,780.61$ -$ 94, 848.39$ 60. 95% State Special Projects 658,917.00$ 224,069.66$ 113, 668.00$ 321, 179.34$ 48. 74% Highway General Maintenance 2,118,613.00$ 837,044.11$ 32, 257.82$ 1, 249,311.07$ 58. 97% Highway Winter Maintenance 1,675,050.00$ 619,016.90$ -$ 1, 056,033.10$ 63. 04% Highway Marking/Signage 385,040.00$ 220,362.45$ -$ 164, 677.55$ 42. 77% County Damage Claims 40,605.00$ 4,812.96$ -$ 35, 792.04$ 88. 15% Other Municipality Sales/Work 492,223.00$ 271,870.10$ 20, 800.00$ 199, 552.90$ 40. 54% Solid Waste Program 178,984.00$ 78,121.28$ 19. 21$ 100, 843.51$ 56. 34% Expense Total 18,427,289.00$ 9,283,124.78$ 198, 348.82$ 8, 945,815.40$ 48. 55% *Values exclude 58210 Capital Outlay Offset, Cost Pool Offsets and Depreciation Expense Revenue Highway Administration 199,979.00$ 144, 639.26$ -$ 55, 339.74$ 27. 67% Highway Supervision 265,100.00$ 179,228.55$ -$ 85, 871.45$ 32. 39% Fleet Operations 5,000.00$ 2,939.27$ -$ 2, 060.73$ 41. 21% Field Small Tools -$ -$ -$ -$ 0.00% Brine Operations -$ -$ -$ -$ 0.00% Fuel Handling 141,455.00$ 100,059.23$ -$ 41, 395.77$ 29. 26% Machinery & Equipment 57,000.00$ 71,549.26$ -$ ( 14,549.26)$ - 25.53% Fleet Staff Payroll -$ -$ -$ -$ 0.00% Salt Sheds 15,500.00$ 16,534.12$ -$ ( 1,034.12)$ - 6.67% DPW Building Complex 168,500.00$ 168,501.15$ -$ ( 1.15)$ 0. 00% Vehicle Maintenance Facility -$ -$ -$ -$ 0.00% Projects 5545-5540 379,760.00$ 278,598.77$ -$ 101, 161.23$ 26. 64% Highway Staff Payroll -$ -$ -$ -$ 0.00% State Routine Maintenance 1,347,525.00$ 791,019.54$ -$ 556, 505.46$ 41. 30% State Winter Maintenance 1,187,398.00$ 763,530.61$ -$ 423, 867.39$ 35. 70% State Damage Claims 155,629.00$ 58,895.98$ -$ 96, 733.02$ 62. 16% State Special Projects 658,917.00$ 224,069.66$ -$ 434, 847.34$ 65. 99% Highway General Maintenance 2,580,500.00$ 2,001,241.13$ -$ 579, 258.87$ 22. 45% Highway Winter Maintenance -$ 3,292.10$ -$ ( 3,292.10)$ 0. 00% Highway Marking/Signage -$ -$ -$ -$ 0.00% County Damage Claims 40,605.00$ 4,812.96$ -$ 35, 792.04$ 88. 15% Other Municipality Sales/Work 492,223.00$ 271,870.10$ -$ 220, 352.90$ 44. 77% Solid Waste Program 115,147.00$ 50,871.80$ -$ 64, 275.20$ 55. 82% Revenue Total 7,810,238.00$ 5,131,653.49$ -$ 2, 678,584.51$ 34. 30% 6,267,230.89$ 23 of 72 Cost Pool Offset Totals Revised Budget Actuals Encumbered Available Available % Fleet Overhead (377,900.00)$ (263,387.24)$ -$ (114,512.76)$ 30.30% Field Small Tools Offset (46,976.00)$ (22,956.43)$ -$ (24,019.57)$ 51.13% Brine Offset (195,600.00)$ (89,645.92)$ -$ (105,954.08)$ 54.17% Equipment Offset (2,014,050.00)$ (1,301,898.82)$ -$ (712,151.18)$ 35.36% Buildings & Grounds Offset (1,064,700.00)$ -$ -$ (1,064,700.00)$ 100.00% Labor & Fringe Offset (4,897,444.00)$ (2,550,282.98)$ -$ (2,347,161.02)$ 47.93% Offset Total (8,596,670.00)$ (4,228,171.39)$ -$ ( 4,368,498.61)$ 50. 82% Projects-Expense Only Revised Budget Actuals Encumbered Available Available % W2639 VMF TIRE BALANCING MACHINE 25,000.00$ -$ -$ 25, 000.00$ 100. 00% W2129 FUELING SYSTEM REPLACEMEN 1,257.86$ 1, 257.86$ -$ -$ 0.00% W2634 DPW GARAGE DOORS REPLACEMENT 80,000.00$ 53. 50$ -$ 79, 946.50$ 99. 93% W2526 DPW ADMIN BLDG EXTERIOR REPAIR 70,766.53$ 56, 827.90$ 9, 037.81$ 4, 900.82$ 6. 93% W2636 DPW LIFT STATION CONTROLS 70,000.00$ -$ -$ 70, 000.00$ 100. 00% W2635 VMF HOIST LIFT CONTROL CONSOLE 80,000.00$ -$ 62, 462.78$ 17, 537.22$ 21. 92% W2638 VMF BUILDING INFRASTRUCTURE 35,000.00$ -$ -$ 35, 000.00$ 100. 00% W2523 PAINT TRUCK REPLACEMENT 749,983.00$ 22. 00$ -$ 749, 961.00$ 100. 00% W2524 TANDEM AXLE PATROL TRUCK (1) 526,500.00$ 477, 908.41$ -$ 48, 591.59$ 9. 23% W2527 ONE-TON PATROL TRUCK (2) 58,980.00$ 57, 156.00$ -$ 1, 824.00$ 3. 09% W2528 LOWBOY TRAILER REPLACEMENT 139,999.23$ 133, 244.73$ -$ 6, 754.50$ 4. 82% W2630 TANDEM AXLE PATROL TRUCK 540,000.00$ -$ 498, 887.94$ 41, 112.06$ 7. 61% W2631 TRACTOR REPLACEMENTS 172,000.00$ -$ 167, 362.64$ 4, 637.36$ 2. 70% W2632 TRAILER MOUNTED SEWER JETTER 115,000.00$ -$ 107, 729.88$ 7, 270.12$ 6. 32% W2633 PATROL TRUCK REPLACEMENT (1) 99,500.00$ 54, 181.48$ 29, 387.00$ 15, 931.52$ 16. 01% W2647 VOLVO PURCHASE 290,000.00$ 271, 650.00$ -$ 18, 350.00$ 6. 33% W2637 SUPERINTENDENT VEHICLE REPLACE 62,200.00$ -$ 47, 981.50$ 14, 218.50$ 22. 86% W2318 BRIDGE REPAIRS 26,564.00$ -$ 26, 564.00$ -$ 0.00% W2422 BRIDGE AND DAM REPAIRS 155,006.00$ 106. 00$ 134, 086.00$ 20, 814.00$ 13. 43% I2313 FLEET DATA TRACKING SYSTEM 2,226.00$ 2, 226.00$ -$ -$ 0.00% Project Total 3,299,982.62$ 1,054,633.88$ 1, 083,499.55$ 1, 161,849.19$ 35. 21% 24 of 72 Department Available Budget-Operating Budget Only* Facilities 2026 August 14, 2026 Operating Budget Activity Revised Budget Actuals Encumbered Available Available % Expense* SO Administration $496,995.50 223,230.48$ 46, 016.08$ 227, 748.94$ 45. 83% SO Range 81,170.00$ 27,396.55$ 15, 561.00$ 38, 212.45$ 47. 08% SO Jail 1,073,122.50$ 528,668.61$ $56, 201.02 488,252.87$ 45. 50% Facilities Administration 1,637,548.00$ 872,739.95$ 64, 142.26$ 700, 665.79$ 42. 79% Facility Machinery & Equipment 149,650.00$ 86,033.75$ -$ 63, 616.25$ 42. 51% Facility Maintenance Staff Payroll* 1,530,785.00$ 836,812.96$ -$ 693, 972.04$ 45. 33% Government Center & Veteran's Park 494,715.00$ 237,408.88$ 39, 466.52$ 217, 839.60$ 44. 03% Judicial Center 693,614.00$ 328,336.55$ 70, 801.36$ 294, 476.09$ 42. 46% Webster House 20,740.00$ 12,352.41$ -$ 8, 387.59$ 40.44% River Rail Transit Commission 30,000.00$ 30,000.00$ -$ -$ 0.00% County Complex 85,555.00$ 13,821.01$ -$ 71, 733.99$ 83. 85% Health & Human Services 388,910.00$ 181,769.97$ 44, 887.53$ 162, 252.50$ 41. 72% Lakeland School (CDEB) 841,519.00$ 383,882.83$ 129, 356.17$ 328, 280.00$ 39. 01% Lakeland Health Care Center* 1,179,874.00$ 616,917.35$ 154, 590.53$ 408, 366.12$ 34. 61% Expense Total 8,704,198.00$ 4,379,371.30$ 621, 022.47$ 3, 703,804.23$ 42. 55% *Excludes 58210 Capital Outlay Offset, labor & fringe offset 51405/51410 or Depreciation Expense Revised Budget Actuals Encumbered Available Available % Revenue SO Administration -$ -$ -$ -$ 0.00% SO Range -$ -$ -$ -$ 0.00% SO Jail -$ -$ -$ -$ 0.00% Facilities Administration 400.00$ 458.13$ -$ (58. 13)$ -14.53% Facility Machinery & Equipment -$ -$ -$ -$ 0.00% Facility Maintenance Staff Payroll -$ -$ -$ -$ 0.00% Government Center & Veteran's Park 1,640.00$ 37.43$ -$ 1, 602.57$ 97.72% Judicial Center 2,000.00$ 1,049.41$ -$ 950. 59$ 47.53% Webster House -$ -$ -$ -$ 0.00% River Rail Transit Commission -$ -$ -$ -$ 0.00% County Complex 175,650.00$ 88,250.00$ -$ 87, 400.00$ 49. 76% Health & Human Services -$ -$ -$ -$ 0.00% Lakeland School (CDEB) 9,890.00$ 9,890.00$ -$ -$ 0.00% Lakeland Health Care Center -$ 224.41$ -$ (224. 41)$ 0.00% Revenue Total 189,580.00$ 99,909.38$ -$ 89, 670.62$ 47. 30% Projects-Expense Only Revised Budget Actuals Encumbered Available Available % W2135 SO CEILING TILE REPLACEMENT 346,087.00$ 57. 70$ -$ 346, 029.30$ 99. 98% W2435 SO EMPLOYEE COURTYARD RENOVATION 14,137.00$ 693. 75$ -$ 13, 443.25$ 95. 09% W2245 SO MARKED SQUAD REPLACEMENT 133,301.02$ -$ 46,394.02$ 86, 907.00$ 65. 20% W2331 SO SQUAD REPLACEMENT 143,366.36$ 152. 50$ -$ 143, 213.86$ 99. 89% W2429 SO SQUAD REPLACEMENT PURCHASE (10) 840,000.00$ 789, 614.22$ 36, 400.56$ 13, 985.22$ 1. 66% W2406 SO DEPUTY-ASSIGNED SQUAD PROGRAM 340,000.00$ 239, 918.81$ 99, 153.80$ 927. 39$ 0.27% W2532 SO SQUAD REPLACEMENT PURCHASE (10) 830,000.00$ -$ -$ 830, 000.00$ 100. 00% W2540 SO REPLACEMENT SQUADS (2) 60,474.00$ 59, 232.77$ -$ 1, 241.23$ 2.05% W2617 SO SQUAD REPLACEMENT PURCHASE (10) 910,000.00$ -$ -$ 910, 000.00$ 100. 00% W2430 JAIL TRANSFER SWITCH 93,411.12$ 83, 625.00$ -$ 9, 786.12$ 10.48% W2533 JAIL PROPER HARDENING 107,938.00$ 8, 887.28$ 85, 107.05$ 13, 943.67$ 12. 92% W2640 JAIL WASHER & DRYER REPLACEMENT 55,000.00$ -$ -$ 55, 000.00$ 100. 00% W2641 JAIL TRASH COMPACTOR/DUMPSTER 56,500.00$ 27, 223.09$ 27, 223.10$ 2, 053.81$ 3.64% W2642 SO KITCHEN WORKTABLE REPLACEMENT 44,000.00$ 4, 989.90$ 33, 812.00$ 5, 198.10$ 11.81% W2643 JAIL FLOORING REPLACEMENT 40,000.00$ -$ 20,818.00$ 19, 182.00$ 47. 96% W2049 SO EXTERIOR MAINT/ENERGY 279,077.50$ 59, 495.27$ 107, 687.05$ 111, 895.18$ 40. 09% W2402 SO BOILER SYSTEM REPLACEMENT 704,161.95$ 372, 356.00$ 272, 363.45$ 59, 442.50$ 8. 44% W2404 SO HEATER UNIT REPLACEMENTS 298,450.25$ 116, 085.75$ 143, 345.00$ 39, 019.50$ 13. 07% W2431 SO HOT WATER BOILER SYSTEM 23,958.34$ 18, 502.90$ 2, 095.44$ 3,360.00$ 14.02% W2440 SO LIGHTNING ROD INSTALL UPGRADE 82,977.50$ 57, 240.00$ 6, 348.00$ 19,389.50$ 23. 37% W2443 JAIL LOCK REPLACEMENTS 1,885.69$ 1,885.02$ -$ 0. 67$ 0.04% W2605 SO GARAGE HEATER REPLACEMENT 65,000.00$ 19. 90$ 24,995.00$ 39, 985.10$ 61. 52% W2606 SO TUBE SYSTEM REPLACEMENT 52,000.00$ -$ -$ 52, 000.00$ 100. 00% W2607 SO HUBER EXTERIOR WALL REPLACEMENT 31,500.00$ -$ -$ 31, 500.00$ 100. 00% W2608 SO OUTDOOR RANGE IMPROVEMENT 745,000.00$ 9, 840.00$ 28, 900.00$ 706, 260.00$ 94. 80% W2003 CTY-WIDE SPACE/SECURITY IMPROVEMENTS 1,596,823.56$ -$ -$ 1, 596,823.56$ 100. 00% W2518 FACILITIES BOBCAT & ATTACHMENT 7,712.00$ -$ -$ 7, 712.00$ 100.00% W2613 FACILITIES TRACTOR REPLACEMENT 83,500.00$ -$ 81,234.31$ 2, 265.69$ 2.71% 3,614,133.61$ 25 of 72 Projects-Expense Only Revised Budget Actuals Encumbered Available Available % W2614 FACILITIES AUTOMATED MOWING 15,000.00$ 9, 800.34$ -$ 5, 199.66$ 34.66% W2522 GC ROOF MAINTENANCE 14,901.00$ 14, 675.00$ -$ 226. 00$ 1.52% W2203 GC UTILITY INFRASTRUCTURE IMPROVEMENT 0.68$ -$ -$ 0. 68$ 100.00% W2611 GC RECRUITMENT TESTING ROOM 25,000.00$ 13, 905.04$ -$ 11, 094.96$ 44. 38% W2519 JC FLOORING REPLACEMENT 20,584.00$ 17, 318.15$ -$ 3, 265.85$ 15.87% W2521 JC VARIABLE FREQ DRIVE REPLACEMENT 11,660.00$ -$ -$ 11, 660.00$ 100. 00% W2405 JC REPLACE HVAC VALVES 320,662.00$ 4, 329.80$ 213, 489.00$ 102, 843.20$ 32. 07% W2601 JC LIGHTING CONTROLS REPLACEMENT 133,000.00$ -$ 17,800.00$ 115, 200.00$ 86. 62% W2603 JC FLOORING REPLACEMENT 50,000.00$ -$ -$ 50, 000.00$ 100. 00% W2604 JC LONG TERM STORAGE 34,500.00$ -$ 18,467.00$ 16, 033.00$ 46. 47% W2609 JC CHILD SUPPORT OFFICE/ENTRANCE 40,000.00$ 2, 992.50$ 31, 987.50$ 5, 020.00$ 12.55% W2610 JC DA ADDITIONAL OFFICE SPACE 240,000.00$ 20, 048.00$ 145, 670.23$ 74, 281.77$ 30. 95% W2426 WEBSTER HOUSE REPAIRS 356,000.00$ 3, 659.73$ 27, 715.87$ 324, 624.40$ 91. 19% W2213 SANITARY SYSTEM LINE REMOVAL 47,312.00$ -$ 32,775.00$ 14, 537.00$ 30. 73% W2602 CAMPUS MAINTENANCE BORDERS 115,000.00$ -$ -$ 115, 000.00$ 100. 00% W2501 CAMPUS SANITARY & STORM SEWER 660,000.00$ -$ -$ 660, 000.00$ 100. 00% W2645 PASSENGER VEHICLE WHEELCHAIR 76,812.00$ -$ -$ 76, 812.00$ 100. 00% W2536 PASSENGER WHLCHAIR ACCESS 175,750.00$ -$ 175,173.00$ 577. 00$ 0.33% W2644 PASSENGER WHEELCHAIR ACCESS 153,624.00$ -$ -$ 153, 624.00$ 100. 00% W2612 LURM VEHICLE REPLACEMENT (1) 58,000.00$ 43, 784.32$ -$ 14, 215.68$ 24. 51% W2541 HHS MAIN BREAKER REPLACEMENT 37,146.00$ 37, 145.49$ -$ 0. 51$ 0.00% W2409 CDEB MULTIFACETED SENSORY 1,525.00$ 853.77$ -$ 671. 23$ 44.02% W2505 CDEB FLOORING REPLACEMENT 13,949.00$ 13, 949.00$ -$ -$ 0.00% W2506 CDEB EXTERIOR SIDING REPAIR 553,677.00$ -$ 3,500.00$ 550,177.00$ 99. 37% W2618 CDEB FLOORING REPLACEMENT 60,000.00$ 31, 675.00$ 11, 950.00$ 16, 375.00$ 27. 29% W2619 CDEB DISHWASHER REPLACEMENT 41,000.00$ -$ -$ 41, 000.00$ 100. 00% W2620 CDEB POOL UV LIGHT & CONTROLS 35,000.00$ -$ -$ 35, 000.00$ 100. 00% W2306-Rollup LHCC BUILDING PROJECTS 1,915,696.46$ 1, 219,135.22$ 616, 056.68$ 80, 504.56$ 4. 20% W2511 LHCC ROOF & EXTERIOR REPAIRS 236,419.19$ 131, 854.67$ 104, 507.65$ 56. 87$ 0.02% W2512 LHCC FURNITURE REPLACEMENTS 1,634.18$ 1,631.00$ 0. 00$ 3.18$ 0.19% W2514 LHCC REKEYING 18,635.12$ (4, 064.54)$ 18, 499.85$ 4, 199.81$ 22.54% W2621 LHCC VACANT WING MODIFICATION 190,000.00$ -$ -$ 190, 000.00$ 100. 00% W2622 LHCC FURNITURE REPLACEMENTS 168,000.00$ 61, 192.52$ 105, 650.71$ 1, 156.77$ 0.69% W2623 LHCC RESIDENT TRANSPORT VEHICLE 100,000.00$ -$ -$ 100, 000.00$ 100. 00% W2624 LHCC KITCHEN WORKTABLE REPLACE 78,000.00$ 6, 229.90$ 52, 959.00$ 18, 811.10$ 24. 12% W2625 LHCC ADMIN AREA RENOVATION 50,000.00$ 24, 976.95$ -$ 25, 023.05$ 50. 05% W2626 LHCC OFFICE FURNITURE REPLACEMENT 45,000.00$ 40, 695.70$ 1, 183.65$ 3,120.65$ 6.93% W2627 LHCC REAR EMPLOYEE ENTRANCE 35,000.00$ 23. 05$ 20,285.00$ 14, 691.95$ 41. 98% W2629 LHCC INDUSTRIAL DRYER REPLACEMENT 9,000.00$ -$ -$ 9, 000.00$ 100.00% W2628 LHCC CONVECTION OVEN 11,000.00$ -$ -$ 11, 000.00$ 100. 00% W2646 LHCC WATER HEATER REPLACEMENT (2) 24,684.00$ 24, 684.00$ -$ -$ 0.00% W2648 GC FACILITY ASSESSMENT 200,000.00$ -$ -$ 200, 000.00$ 100. 00% Project Total 14,359,432.92$ 3,570,314.47$ 2, 613,546.92$ 8, 175,571.53$ 56. 94% Lapse Project 26 of 72 To: CC: From: Date: RE: Rank Status 1 N/A 2 Construction Phase 3 Construction Phase 4 Closure Phase 5 Construction Phase Memorandum September 8, 2026 Walworth County Public Works Committee Walworth County Administrator - Mark Luberda Richard Hough - Public Works Director Construction in progress. Stage-3 construction (Center St. to George St) is underway. Highway remains open to through traffic with reduced lanes. CTH H - USH 12 to Co. Line The highway is closed to through traffic, but remains open to local traffic. Detour is in place for non-local traffic and trucking. Pavement Preservation Strategies - Highway Div. Chip seal operations were completed on 18.9 miles of roadway, including sections of CTH P, CTH O, and CTH NN. Reclamite was completed on CTH O and multiple campus parking lots. Lakeland Health Care Center Renovation Several air handling units are sweating, and two VAVs lack dampers, causing excess moisture. Some systems need low temperature sensors before proper sequencing. Project Remarks Lake Beulah No Parking Zone The department inspected the area and identified that all appropriate No Parking signage is in place. Use of barriers in the right-of-way, e.g., rocks is not safe and fencing is appropriate due to public and repairing access rights. CTH H - Lake Geneva Construction and Project Management Summary Report - September 2026 Director's Top Five Projects: (including $1M+ Projects) 27 of 72 Page 2 CO # % Change (since last approval) 1 0.18% 2 1.24% 2 8.40% 1 0.26% 2 2.77% 1 3.86% 2 8.47% Date 16-Jul 26-026 Price Park Natural Play Structure $2,882.00 26-003 CTH-H (Williams to STH-120), 240H1 $1,938.00 1090-25-01/71 I-43 Rock Freeway WIS 50 to US 12, Walworth County, Replace the deteriorating pavement and address substructure conditions and decreased ride quality; Preserve the condition and service life of the existing bridge structures; Address safety, operational, and drainage needs. Queuing along the I-43 SB off ramp to STH 67 blocking right turn lane. FY 29-31 26-026 Price Park Natural Play Structure $3,433.38 Highlights and Activities WisDOT Design Highlights Project 26-003 CTH-H (Williams to STH-120), 240H1 $11,575.00 Change Orders (Report Only) Project # Title Value $ 25-124 SO Exterior Building Remediation $19,050.00 24-073-R2 SO Hot Water Heating System & CUH $23,743.00 26-009 CTH-H (USH-12 to County Line), 250H1 $4,229.60 28 of 72 Page 3 Project Highlights and Activities County Engineer Major Project Summary (Since Last Report) W2648 Government Center Facility Needs Assessment Highlights and Activities 26-003 - CTH-H George St. to Geneva Square 26-009- CTH-H USH-12 to Co. Line Construction in progress. Stage-1 & 2 construction (Center St. to E. Geneva Square) is substantially complete. Stage-3 construction (Center St. to George St) is underway. Highway remains open to through traffic with reduced lanes. Bridge inspections (County and Local) are underway. Delivery of final inspection reports anticipated later this year. Construction in progress. Culvert replacements, drainage improvements and pavement removals complete. Highway is closed to through traffic, but remains open to local traffic. Detour is in place for non-local traffic and trucking. Project Associate County Engineer Top 3 Project Summary (Since Last Report) 2026 -Countywide Bridge Inspections Excel Engineering has begun existing building report reviews and scheduling on-site inspections of the building and the proposed CIP projects. The onsite review will include a mapping document of the spaces via 3D spatial data platform. Needs assessment questionnaires are being prepared for input from the county departments later this month. 26-032 Emergency Mitigation Services 24-056 / W2306, W2307, W2414 Lakeland Health Care Center Renovation We are still waiting for final inspections from the local and state inspectors to move into the last wing and finalize the closeout of the contract. The Compliance Statement and testing and balancing reports were issued. The punchlist work is progressing as the mechanical system adjustments are being made to address overall operations and controls. Statement of Qualifications (SOQ) is being evaluated for Master Services Agreements (MSA) with multiple emergency mitigation services contractors, should the need arise. Request for qualifications went out in August 2026. Award recommendations are anticipated in October 2026. 29 of 72 Page 4 DD (Name) Highlights and Activities Barry Pierce Barry Pierce Barry Pierce Vijay Narayanan Vijay Narayanan Vijay Narayanan Deputy Director(s) Top 3 Summary (Since Last Report) Lakeland School Reclamite This pavement preservation technique was completed on CTH O and multiple campus parking lots Operating Budget & CIP Development Service Contracts Continuing workload for Service Contracts and/or Cooperative Purchase Agreements. 1) Completed: Extension of Janitorial Cleaning Services 2) In-Progress: SO Range - HVAC PMs & Services & Lead Filter Removal; Elevator Maintenance & Repair Service; CRAC Unit PMs & Repairs; JC - X- Ray PM & Services; Water Treatment Services Completion of Summer Project in Preparation for 2026/2027 School Year: - Courtyard Pergola Stain Finish - Planter beds, tree berms, and courtyard beds - clean, prune, and top- dress with mulch - Classroom flooring projects - Interior flooring cleaning projects - Pool maintenance & cleaning projects Development of 2027-2036 CIP 1-5 Year Projects and 2027 Operating Budget Project Shouldering This maintenance was completed from HWY 12 to CTH P to preserve roadway edges County Chip Seal This pavement preservation technique was completed on 18.9 miles of roadway including sections of CTH P, CTH O, and CTH NN 30 of 72 Page 5 PM (Name) Highlights and Activities Joe Latocha Joe Latocha Joe Latocha Elliott Blaszczyk Elliott Blaszczyk Elliott Blaszczyk Replacement of the back employee entrance at LHCC. Includes double doors, electrified mullion, and relocation of card reader. Vendor is expected to get the door September 23rd. W2627 LHCC Rear Employee Entrance The playground base, structure, and border are installed. Currently waiting on net, rope, and clambering loop features to be shipped and installed. W2538 Price Park Natural Playground W2405 Judicial Center HVAC Valve Replacement Heating valve replacements have begun. The entire basement and 3/4 of the 1st floor are complete. Building heat is ready to be turned on at any point if needed. An additional 43 VAVs will be added to the project to complete the 2nd floor this year. The 3rd floor is to be completed in 2027 if additional budget is approved. Project Manager(s) Top 3 Summary (Since Last Report) Project W2608 SO Outdoor Range DPW is moving forward with Terracon to develop an RFB for remediating lead at the shooting range. Concurrently, DPW is working on a solution to rebuild the shooting range following the remediation process. RFP reviewed by purchasing, DPW is working through recommended changes. New Heating System has been commissioned and is running. Punchlist items are expected to be completed by mid-late October. Lead times on specialized materials has extended the project completion date slightly. W2003 Phase II Security RFP W2402/W2404 Boiler & Cabinet Unit Heater 31 of 72 Approved Enacted 10/22/2021 Form 6-310-B Revised 07/18/2025 Change Orders Page 1 of 2 Form 6-310-B: Project Change Order Internal Routing Approval Request Contract Name: 26-003 CTH-H (Williams to STH-120) Contract Number: 2770 Vendor Name: Payne & Dolan, Inc. Department Purchasing Contact: J. Kroll 1. Change Order D etails Change Order( s) #: 3 Type of Change Order (select all that apply): ☐ T he work outlined in the cha nge order has already been performed. Failure to proceed with the change order would have resulted in cessation of work and financial loss. ☒ P roposed work is beyond the original scope of work. ☒ P roposed work could not have been reasonably foreseen by architect, contractor, vendor , or County. ☐ P roposed work due to error or omission (further explained in comments below). ☐ S avings as a result of reduced scope or value engineering. Change Order(s) Description: Labor, equipment and materials to construct a lane widening and two-way left turn lane along CTH-H between Center St. and Sheridan Springs Rd. ☐ Special circumstances/emergency/timing concerns requiring immediate action ☒ Updated Contract Dates: October 16, 2026 ☐ Additional scope of work (justification to amend contract vs. a separate procurement in comments below) Additional Comments: N/A 2. Change Order Amounts/Funding Change Order Amount: ☒ Actual (firm fixed, not-to-exceed) ☐ Estimated (indefinite quantity, time and materials, etc.) O riginal Contract Amount ................................................................................... $ 1,085,998.98 P rior Approved Change Order(s) ............................................................................. $ 13,513.00 A mount of this Change Order(s): ........................................................................... $ 200,486.41 R evised Contract Total with this Change Order(s) : ............................................ $ 1,299,998.39 P ercentage of total change orders, including this change .................................................. 19.7% P roject Contingency Remaining: ............................................................................ $ 286,487.00 Account Number/Name: 4170H-58140-240H1/CTH H (Williams to STH 120) Budget Sufficient? ☒ Yes ☐ No Budget/Funding Comments: N/A 3. Review Process (DPC to check the box for each applicable approval required.) Reviewer approval confirms the change is reasonable, in the County’s best interest, and funds are available. A ll approvals are obtained electronically through the Intake Request (except for Committee Approval/Report) ☒ Department Head ☒ Purchasing Manager ☐ Corporation Counsel (if non-standard/vendor change order) ☒ Finance Director/Highway Commissioner (if within authority or proceeding to Administrator or Committee) ☐ County Administrator (if special circumstances, reissuance, or proceeding to Committee) Co mmittee: Public Works Type: Report Only Meeting Date: ___9/14/2026___ Committee: N/A Type: N/A Meeting Date: ___________ 32 of 72 Approved Enacted 10/22/2021 Form 6-310-B Revised 07/18/2025 Change Orders Page 2 of 2 33 of 72 Approved Enacted 12/06/2019 Form 6-225-A Revised 04/14/2026 Waiver of Competition Page 1 of 3 Form 6-225-A: Waiver of Competition Completed by Requesting Department Waiver of competition (WOC) category: ☐ Sole Source ☒ Non-Competitive Date of request: 8/25/2026 Are grant funds being used: ☐ Yes ☒ No Account: Org: 5525 Object: 53610 Project: N/A Grant allows WOC?: ☐ Yes ☐ No ☒ N/A Requesting department: PW-Highway Department contact: Vijay Narayanan Description of good or service: Snowplow replacement cutting-edge blade profiles purchased for winter maintenance operations. Vendor information: Name: Burke Truck & Equipment Inc. City, State, Zip: Madison, WI 53718 Website address (if available): www.burketruck.com If the good is a brand name or proprietary to one manufacturer, can more than one distributor provide the product to the County? ☒ Yes ☐ No ☐ N/A Total cost, including all options for renewal or extension: Estimated Total Cost is $103,265.53. Because the quote has a short expiration period, this WOC will allow for a cost adjustment of +/- 2.5% Requested term of WOC: ☒ One-time purchase ☐ Recurring purchase/contract Contract term: N/A If recurring purchase, describe anticipated future purchases, including on-going maintenance: N/A Uniqueness, Special Circumstance and/or Time Constraints Explanation of uniqueness of good or service, including a description of the patented or proprietary features, and/or sole-source nature of the good or service: The snowplow blades are unique due to their carbide‑reinforced cutting edges, OEM‑specific mounting patterns, and compatibility requirements with the County’s existing plow equipment. These patented design features ensure proper fit, performance, and durability, making the product safe and reliable for winter road maintenance. How are unique features essential to department: These snowplow blades are fully compatible with the department’s existing snowplow equipment, meet required performance and safety standards, and provide the durability needed for reliable winter road maintenance. Special circumstance, prior investment considerations, and/or time constraints, if any: Carbide pricing remains highly volatile, driving snowplow blade costs significantly higher than in past purchasing cycles. Securing blades now allows the department to lock in current pricing and avoid further increases. During this process, the originally considered vendor (Nordik) became unresponsive, compressing the timeline and reinforcing the need to pursue a WOC to ensure timely sourcing and delivery ahead of the winter season. Given pricing volatility and the need to maintain winter operational readiness, prompt procurement is essential for both budget stability and reliable service. 34 of 72 Approved Enacted 12/06/2019 Form 6-225-A Revised 04/14/2026 Waiver of Competition Page 2 of 3 Alternative Sources An alternatives sourcing search was conducted consisting of (check all that apply): ☒ Market research ☒ Contacted other vendors ☐ Other Describe the alternative sourcing efforts: The department obtained quotes from three (3) vendors and compared pricing against cooperative contract options available through NASPO. Cooperative vendors were evaluated but ultimately not selected due to higher pricing or, in the case of Nordik, lack of responsiveness. Because Nordik was non-responsive and other cooperative vendors offered higher pricing, these alternatives did not meet the department’s needs. Therefore, pursuing a WOC was necessary to ensure a reliable and timely supply. List all alternative sources investigated and reason good/service does not meet need: 1. Three (3) vendor quotes: Burke Truck & Equipment; DMC Wear Parts; Gray’s Inc 2. Comparison of unit pricing from Nordik NASPO ValuePoint Master Agreement Number 47646 ($1,290 for 4-ft; $967 for 3-ft blade) 3. N/A Cost Analysis Cost has been fairly and reasonably established by (check all that apply): ☒ Comparison to public sector contract pricing ☐ Comparison to previous comparable pricing ☐ Discount off of published price ☒ Market survey of other vendors ☐ Other Department explanation of above efforts ensuring fair and reasonable pricing: The department verified fair and reasonable pricing by obtaining competitive quotes from three (3) vendors and comparing unit costs for 3‑ft and 4‑ft blade sections against NASPO cooperative contract pricing. This review confirmed that the selected vendor’s (Burke) pricing aligns and is most favorable with current market conditions. Describe any financial benefits or implications of the requested waiver, which may include such issues as avoiding future costs, extending useful life, secondary or indirect cost savings, etc.: The requested waiver provides financial benefits by avoiding additional cost increases driven by ongoing volatility in carbide pricing. All approvals are obtained electronically 1) Department Head 2) Purchasing Manager or Supervisor (final approver if <$25,000) 3) County Administrator (if ≥$25,000) ☐ DPC to report to appropriate Committee if ≥$100,000. Electronic Approvals are included below for Committee Reporting only. Committee/Date Reported Public Works 9/14/2026 35 of 72 Approved Enacted 12/06/2019 Form 6-225-A Revised 04/14/2026 Waiver of Competition Page 3 of 3 36 of 72 M emorandum To: Public Works Committee Members Cc: Walworth County Administrator – Mark Luberda Sheriff’s Office – Sheriff Gerber From: Public Works Director – Richard Hough Date: September 1, 2026 Re: E ‑Bike Safety, Regulation, and Policy Recommendations Most states, including Wisconsin, have adopted a three‑class system that distinguishes e‑bikes by their speed capability and motor assistance type. This model has become the nationwide standard, offering a uniform language for manufacturers, retailers, and policymakers. W isconsin’s statutes regulating e‑bikes align with this three‑class model. Class 1 and Class 2 e‑bikes assist riders up to 20 miles per hour, while Class 3 pedal‑assist bicycles can reach 28 miles per hour and require riders to be at least sixteen years old. The statutes permit e‑bike use on public roads and bike lanes, treating them largely the same as traditional bicycles. However, shared‑use paths and trails are governed by local authorities and the Wisconsin DNR, which generally allow Class 1 and Class 3 e‑bikes on many state trails but limit speeds to 15 miles per hour and prohibit certain throttle‑equipped Class 2 models. These statewide and DNR rules form a reasonable foundation but do not fully address emerging safety concerns involving youth ridership, trail conflicts, and illegal aftermarket modifications that increase speed capability, and new, more powerful e-moto bikes and scooters with motors exceeding 750 watts. Con sidering these trends, Walworth County can provide leadership by advocating for a set of statewide improvements to harmonize rules, strengthen safety practices, and distinguish e-bikes from other bicycles in reporting. A minimum age of 15 for all categories of e-bikes and 16 for e-moto equipment with engines greater than 750 watts, and mandatory registration is also recommended. O ther meaningful recommendations the county could consider include banning unregistered vehicles (e-bikes) for commuting purposes, e.g., daily commute to and 37 of 72 Re: E ‑Bike Safety, Regulation, and Policy Recommendations from school. Restrict e-bike and e-motos for school-age children to one person. Restrict use of earbuds or headphones while riding. R eference Data: 1 Article, April 15 29, 2026, Illinois Senate Unanimously Passes Giannoulias E-Bike Bill 2 Article, Riding into school year with a focus on safety. 3 E-bikes, E-scooters and E-motos Flyer, Children’s Wisconsin C urrent Rider & Safety Regulations • Helmets: No statewide e-bike helmet mandate exists, though helmets are heavily recommended and required for all riders under 18. • Age Restrictions: Operators of Class 3 e-bikes must be 16 years or older. • Sidewalks: Sidewalk riding is dictated by local municipal code; state statute does not allow sidewalk riding unless local ordinances explicitly permit it. • E-Motos: Bikes modified to exceed these speed caps or powered by motors larger than 750 watts lose their e-bike status and may be regulated as mopeds or motorcycles. S ummary Recommendations for County Ordinance • Age Restrictions: . o Operators of Class 1 & 2 e-bikes must be 15 years or older. o Operators of Class 3 e-bikes must be 16 years or older (State Law) o Operators of e-motored vehicles capable of 28 mph (or more) must be 16 years or older. • Sidewalks: Restrict e-bikes on all sidewalks within the County rights-of-way. • Registration: Bikes and e-vehicles larger than 750 watts lose their e-bike status and may be regulated and registered as mopeds or motorcycles. • Requirements: A headlight and taillight are required on E-bikes and E-scooters for nighttime riding. Restrict the age for all e-bikes and e-motos capable of speeds of 28 mph or more to riders aged 15 to 18 years old. Forbid use of earbuds or headphones while riding e-bikes and other e-moto vehicles. • Penalties: Riders in violation of the age requirement, permitted riding location, required equipment or means of responsible operation can be cited by the Sheriff’s Office. Fines can be issued up to $500 based on the number of offenses. In addition, riders committing reckless conduct can have the device impounded for a period of up to 60 days, along with additional fines issued. S ummary Recommendations for County Resolution • Helmets: Required for all e-bike and e-moto riders between 15 to 18 years old. • Age Restrictions: . o Operators of Class 1 & 2 e-bikes must be 15 years or older. o Operators of Class 3 e-bikes must be 16 years or older (State Law) 38 of 72 Re: E ‑Bike Safety, Regulation, and Policy Recommendations o Operators of e-motored vehicles capable of 28 mph (or more) must be 16 years or older. • Registration: Bikes and e-vehicles larger than 750 watts lose their e-bike status and may be regulated and registered as mopeds or motorcycles. Forbid use of earbuds or headphones while riding e-bikes and other e-moto vehicles. • School Training: Mandate that elementary and junior high schools provide a minimum of 2 hours of annual training on e-bikes and general transportation rules annually. 39 of 72 E-bikes, E-scooters and E-motos Speed Changes Everything Who Should Ride? • Children younger than 12 should not ride e-bikes, e-motos or e-scooters. • Kids ages 12 to 15 may ride only a Class 1 e-bike if a parent feels they are ready and can ride safely. • Kids 16 years and older may ride e-bikes and e-scooters. They may ride e-motos if they are registered and the rider has a license. What Kind of Helmet Should Your Child Wear? A regular bike helmet may not protect your child in a high-speed crash. Choose a helmet made for faster speeds. Look for one with one of these safety labels on the inside liner of the helmet: • ASTM F1952 • NTA 8776 • DOT Every rider should wear a properly fitted, speed-rated helmet every time they ride. Ho w Can You Help Your Child Ride Safely? Help keep your child safe by making sure they: • Wear a helmet every ride. • Wear closed-toe shoes. • Wear bright clothing. • Use lights if you ride when it is getting dark. childrenswi.org/safetycenter safetycenter@childrenswi.org © 2026 Children’s Wisconsin. All rights reserved. CS_SAF_324_0726 Safety Center E-bikes (electric bicycles), e-scooters (electric scooters) and e-motos (electric motorcycles or dirt bik es) are becoming more popular with kids and teens. They go much faster than regular bikes and sc ooters, so they can be more dangerous. Crashes can cause very serious injuries or death. • Know the rules of the road. • Watch for people walking and for cars. • Keep their phone put away. • Do not wear earbuds or headphones while riding. • Never carry another person on an e-bike or e-scooter. • Follow local rules for riding. Is Your Child Ready? Think about if your child can: • Follow traffic rules. • Always pay attention. • Stay off their phone while riding. • Make safe choices, even when friends are around. You can ask yourself: Would I trust my child to safely ride a motorcycle or moped? If the answer is no, your child is probably not ready for an e-bike, e-scooter or e-moto. 40 of 72 41 of 72 42 of 72 43 of 72 44 of 72 Home 2026 News Illinois Senate Unanimously Passes Giannoulias E-Bike Bill Illinois Senate Unanimously Passes Giannoulias E-Bike Bill Comprehensive micromobility safety plan targets dangerous high-speed e-bikes, e-motos and other unregulated electric devices exceeding 28 mph Illinois Senators today approved a sweeping statewide safety initiative spearheaded by Secretary of State Alexi Giannoulias to address the growing dangers posed by unregulated high-speed e-bikes, e-motos and other powerful electric transportation devices operating on streets, bike lanes and sidewalks across the state. “As these devices become faster, heavier and more powerful, our laws must keep pace to protect riders and the public,” Giannoulias said. “This initiative closes dangerous regulatory gaps, creates uniformity across Illinois communities and ensures riders understand the responsibilities that come with high-speed electric devices. We’re replacing a confusing patchwork of local rules with clear statewide standards that prioritize safety.” The legislation is part of Giannoulias’ Ride Safe, Ride Smart, Ride Ready campaign – a multi-pronged effort combining public education, updated rider training and legislation designed to modernize Illinois law as the micromobility industry rapidly evolves. From 2019 to 2022, micromobility-related injuries and fatalities surged 300% across the country, including Illinois. Giannoulias credited State Sen. Ram Villivalam (8th District – Chicago), Chair of the Senate Transportation Committee and sponsor of the legislation, while lauding members of the Senate for passing SB 3336 unanimously 54-0. He also thanked the wide-ranging group of stakeholders who provided input, including: the Illinois Municipal League (IML), Illinois High School and College Driver Education Association, Ride Illinois, Illinois Association of Chiefs of Police, ABATE, and Lurie Children’s Hospital. The Illinois House will now consider the bill, where it is sponsored by State Rep. Barbara Hernandez (50 District – Aurora). “Micromobility is quickly transforming how Illinoisans get around and is now part of everyday life, but innovation without guardrails puts people at risk,” Villivalam said. “This legislation brings safety, accountability and common-sense protections to reflect today’s reality and a new era of mobility.” “This is exactly the kind of forward-looking legislation Illinois needs as new technology reshapes how people travel,” Hernandez said. “By setting clear statewide rules for higher-speed devices, we are protecting riders, reducing confusion for law enforcement and helping prevent avoidable tragedies before they happen." The initiative focuses on higher-powered, higher-speed devices that fall outside current state definitions or remain largely unregulated, including certain e-bikes, e-motos and electric scooters, skateboards and unicycles. Illinois currently has no laws governing e-bikes and other micromobility devices that exceed 28 mph. Many of these devices have motors that exceed 750 watts and can travel well beyond 28 mph – in some cases over 50 mph – yet are not clearly addressed under existing law. Illinois will maintain its current three-class e-bike structure, which covers pedal bicycles with electric motor assistance up to 28 mph – a framework already used in 46 other states. Under the proposal, those classi fications would remain unchanged except for new age requirements that a rider on a Class 1 or Class 2 must be at least 15 years old. Under the legislative framework: Riders of e-bikes and e-motos capable of traveling over 28 mph would be required to have a driver’s license, title, registration and insurance. High-speed micromobility devices such as e-scooters, electric skateboards and electric unicycles would be prohibited from operating over 28 mph on roads, bike lanes, bike paths and sidewalks. In addition, riders of any electric micromobility device must be at least 16 years old. ... April 15, 2026 th 8/17/26, 7:59 AM Illinois Senate Unanimously Passes Giannoulias E-Bike Bill https://www.ilsos.gov/news/2026/april-15-2026-illinois-senate-unanimously-passes-giannoulias-e-bike-bill.html 1/2 45 of 72 The legislation establishes statewide consistency, replacing the current patchwork of local ordinances that vary widely from one municipality to another. If signed into law, the bill would take effect on January 1, 2027 . E-bikes and e-motos purchased prior to that date would be exempt from the title requirement but must still be registered. Along with the legislation, the Ride Safe, Ride Smart, Ride Ready campaign will deliver: Statewide public awareness outreach for parents, riders and retailers, Updated driver education materials focused on sharing the road safely, Law enforcement guidance and community safety partnerships, and Outreach to schools and municipalities on responsible micromobility use. The initiative is part of the Secretary of State’s broader effort to modernize transportation safety laws and respond proactively to emerging technologies before preventable injuries and fatalities continue to rise. -#- Back to Top 8/17/26, 7:59 AM Illinois Senate Unanimously Passes Giannoulias E-Bike Bill https://www.ilsos.gov/news/2026/april-15-2026-illinois-senate-unanimously-passes-giannoulias-e-bike-bill.html 2/2 46 of 72 M emorandum To: Public Works and Parks Committee Members Cc: Walworth County Administrator – Mark Luberda From: Public Works Director – Richard Hough Date: September 1, 2026 Re: ATV Discussion on Multimodal Use on White River County Trail The Department of Natural Resources has a five-step process for ATV trail development outlined in its ATV and UTV Trail Guidelines, Publication PR-391, Version 07.01.22, which are outlined below: Th e most important first step in planning a trail is to determine the trail’s purpose and objectives. Why do we want this trail? Who will use the trail? What needs will the trail meet? (Examples of needs a trail could be intended to meet: local economic development, regional recreational demand, transportation, connectivity.) How will it be managed, maintained, constructed, and funded? Funding considerations should include initial investments and long-term maintenance needs. This can be dictated by a number of factors, but available resources for construction, maintenance, and management should be key factors. A trail cannot provide every type of experience desired by diverse user groups. Take time to consider and determine what kind(s) of trail you are going to provide – what will the 47 of 72 Re: ATV Discussion on Multimodal Use on White River County Trail allowed uses be, what will the managed and designed uses be? Further, recognize that this will likely not result in the ideal experience for all allowed trail uses. There are many other viewpoints to consider when planning to incorporate ATVs on existing trails, on both the user side and in trail management and maintenance. Factors such as available resources, trail concept, and setting must be looked at holistically when determining the kind of experience to be offered and maintained on a trail. W hile DNR is ultimately responsible for any decision to incorporate ATVs on White River Trail, the Department of Public Works management and staff do not believe it is wise to pursue, given a history of insufficient maintenance due to a lack of resources (staff time, grant funding) to maintain and keep the trail safe for multiple types of users. 48 of 72 M emorandum To: Public Works Committee Members Cc: Walworth County Administrator – Mark Luberda From: Public Works Director – Richard Hough Date: September 2, 2026 Re: Public Works Committee Priorities for Government Center Study Director requests that you give consideration to your information priorities during the Government Center Study. The process will include future committee progress reports and then a final report. However, consider what your priorities for the study may include. Example priorities: seeking information on minimum footprint requirements for any new facilities; I am most interested in the longevity and total costs of the existing facility; or, I am interested in the maximum longevity of a new building versus the realistic max life- cycle of the current facility. Now that a consultant is onboarded, your guidance will be valuable to the study and process. Current tasks for the consultant include: T ask 1 – Physical Facility Assessment Task 2 – Functional Facility Assessment, e.g. Adjacency Analysis Task 3 – Develop New Facility Options Task 4 – Cost Estimation and Comparative Analysis Task 5 – Presentation of Analysis Task 6 – Alternatives Analysis Task 7 – Peer Review of Exterior Study 49 of 72 1 Memorandum To: W alworth County Public Works Committee Cc: Walworth County Administrator – Mark Luberda Cc: Other Department Heads Involved in Committee From: Richard Hough, Director of Public Works RAH Date: September 7, 2026 RE: Rooted in Service, Powered by Community Needs – 2027 Operating Budget Walworth County Public Works (PW) employs a team of seventy-one skilled, dedicated employees who provide a range of services for county residents and other departments. WALCO services are set and scheduled by task, staffing availability, and frequency needs. Our goal is to deliver these services in a timely, efficient, professional, and safe manner. Public Works services are defined by a level-of-service commitment and guided by state and federal regulations and internal policies. This document provides an overview of the department's organizational structure and payroll costs, followed by Public Works service standards, associated goals and key performance measures, which guide the development of our 2027 Operating Budget. TAB LE OF CONTENTS ORGANIZATIONAL STRUCTURE & PAYROLL 2 HIGHWAY OPERATIONS 4 Highway Winter Maintenance Service 4 Roadway Management 6 Roadside Management 9 ASSET MANAGEMENT DIVISION 10 Facilities Management 10 Fleet Management 12 Parks Management 14 SOLID WASTE PROGRAM 16 HIGHWAY INFRASTRUCTURE 18 FACILITIES / PARKS INFRASTRUCTURE 20 Level of Service Clarifications 21 50 of 72 2 ORGANIZATIONAL STRUCTURE & PAYROLL Position 2026 Budget Current Positions 2027 Budget Request E nding Resul t Public Works Public Works Director 1.00 1.00 1.00 County Engineer 1.00 1.00 1.00 Business Office Coordinator 1.00 1.00 -1.00 0.00 Business Office and Logistic Services Supervisor 0.00 0.00 1.00 1.00 Facilities Deputy Director Asset Management (also Fleet & Parks) 1.00 1.00 1.00 Associate County Engineer Civil 1.00 1.00 1.00 Senior Project Manager 1.00 1.00 1.00 Project Manager 1.00 1.00 1.00 Facilities Foreman 1.00 1.00 1.00 Operations Support Assistant 1.00 1.00 1.00 Maintenance Technician I 1.00 2.00 2.00 Maintenance Technician II 4.00 2.00 2.00 Maintenance Technician III 6.00 6.00 6.00 Journeyman Electrician-New 2026 0.00 1.00 1.00 Finance Finance Manager 1.00 1.00 1.00 Senior Accountant 1.00 1.00 1.00 Accounting Assistant 1.00 1.00 1.00 Fleet Fleet Foreman 1.00 1.00 1.00 Mechanic I 1.00 1.00 1.00 Mechanic II 5.00 5.00 5.00 Fleet Inventory Specialist 1.00 1.00 1.00 Highway Deputy County Highway Commissioner 1.00 1.00 1.00 Superintendent 3.00 3.00 3.00 Assistant Superintendent 4.00 4.00 4.00 Highway Maintenance Worker 28.00 28.00 28.00 Operations Support Assistant 1.00 1.00 1.00 Parks and Grounds 0.00 0.00 Environmental Resource and Park Foreman 1.00 1.00 1.00 Groundskeeper 2.00 2.00 2.00 Total Positions 71.00 71.00 0.00 71.00 Department of Public Works Headcount The Director recommends creating a streamlined Administrative Section to improve internal use of IT systems, administrative workflows, and logistics accountability operations. 51 of 72 3 52 of 72 4 HI GHWAY OPERATIONS S implified Level of Service Statement: Walworth County maintains approximately 400 county lane miles and 700 state lane miles. Winter maintenance prioritizes driving lanes and ramps based on WisDOT Categories 3–5. Crews first focus on plowing to prevent packing, then on achieving passable and, eventually, bare pavement conditions as soon as practical after each event. Clear wheel tracks are acceptable during the transition period when conditions warrant. C ritical Data (Section Lengths): Client Routes Average Route Length Remarks State Roadways 131 47 46 Statewide Average. Total hours per lane mile 5.04, with Cat. B average of 5.94. County Roadways 10 35.7 1 Route requires five (5) additional plows to clean and maintain ramps and second lanes. P rimary Goals: Plowing is the first priority for winter maintenance operations. If packing should occur, Public Works will then strive for “passable roadway” conditions and eventually “bare pavement” conditions as soon as practical, after the winter weather event. During the time between the winter storm event ending and achieving “passable roadway” conditions, it is acceptable that only clear wheel tracks be provided when conditions warrant. K ey Performance Indicators: HIGHWAY WINTER MAINTENANCE SERVICE Mandate(s): Ordinance 16.25 Snow and Ice Removal Plan for County Trunk Highways and State Highways; State Statute 84.07(5) County Highway Department Maintenance Capacity and Funding for State Highways; and, WisDOT Highway Maintenance Manual (Chapter 6 Winter Maintenance). 53 of 72 5 E stimated Budget Allocation: WisDOT Winter Maintenance (RMA) Total: $1,333,870 C ounty Maint. Total: $1,729,100 (In tentionally Left Blank) Key Budget Highlights: RMA rose 12.3%. The county budget has no significant budget changes from previous years. NOTE: Payroll figures in this document do not account for vacancy payroll savings, which were set at 3% in coordination with County Administration. 54 of 72 6 Simplified Level of Service Statement: Routine maintenance (crack filling, patching, markings, shoulder repair) is scheduled annually to preserve roadway condition and extend pavement life. Corrective maintenance addresses unplanned hazards that require immediate action. These efforts support the County’s 30– 35–year road improvement life cycle goal and keep both state and county roads safe for the traveling public. Below are common crew actions managed by the Highway Division to maintain state and county roadways: Maintenance Activity Approximate Labor Hours Remarks Pavement Surface 1,212.25 Maintenance includes Spot Repair, Crackfilling, Sealcoating, Milling/Bump Removal, and Thin Resurfacing, County Culvert & Bridge 482.25 County Culvert hours only; Bridge repairs occur during even years Guardrail & Impact Attenuator 114 142 individual sections of County Guardrail across 10 Snow Sections Pavement Markings 1,201.50 Pavement Markings are refreshed annually Signage and Traffic Control Device (TCD) 1,082.50 County Signage inventory of 3,508 signs Primary Goals: Non-winter roadway maintenance focuses on extending pavement life, maintaining effective drainage, and ensuring safe travel by filling potholes, repairing rutted areas, and smoothing rough pavement. The department also maintains bridges and culverts in good condition, repairs damaged guardrails, updates roadway markings, and coordinates pavement preservation work with planned road improvement projects to support a 30–35-year roadway life cycle. (Intentionally Left Blank) ROADWAY MANAGEMENT Mandate(s): Ordinance 16.24 County Trunk Highway Maintenance and Improvement Standards; State Statute 83.065 County Road and Bridge Fund – Tax Levy. 55 of 72 7 K ey Performance Indicators: E stimated Budget Allocation: WisDOT Non-Winter Maintenance (RMA) Total: $1,638,100 plus an additional $611,040 for Discretionary Maintenance Agreement (DMA) projects1 1 State RMA budget does not separate out roadway and roadside costs until late 2026. 56 of 72 8 Co unty Non-Winter Maintenance (RMA) Total: $2,655,000 plus $397,815 (Marking and Signage Operations)1 1 The county budget groups roadway and roadside activities together; therefore, the tables above combine both services. H ow is it that State Non-Winter Maintenance is nearly $1M more for far less lane mileage (700 State, 400 County)? I’m glad you asked. County non-winter maintenance costs appear higher— nearly $1 million more—despite fewer lane miles (700 state vs. 400 county) because WisDOT operates on a shorter roadway life-cycle of approximately 13–17 years, while the County is working toward a 30–35-year life-cycle. In addition, the County must absorb costs associated with facilities, park collaborations, and other non-state obligations that are not reimbursed through State maintenance agreements. Key Budget Highlights: We anticipate higher costs for roadside oil, paint, and other oil-based materials. To improve daily workflow, the department plans to equip Highway Maintenance teams with tablets so they can record work in real time, eliminating end-of-day administrative tasks that currently require 18 staff hours. In addition, the Administrator’s Budget shifts certain Purchased Services costs from the operating budget to the Road and Bridge Fund, providing $1 million to support small culvert projects over the next decade. 57 of 72 9 S implified Level of Service Statement: The County maintains 550 centerline miles of roadside areas using mowing, vegetation control, drainage maintenance, and litter/encroachment removal. Urban and rural mowing schedules follow state standards, with tree/brush work completed primarily in fall and winter to protect wildlife and reduce safety hazards. Drainage and ditch maintenance ensure proper water flow and reduce flooding impacts. Below are common roadside crew actions managed by the Highway Division to maintain state and county roadsides: Maintenance Activity Approximate Labor Hours Remarks Ditch & Drainage 1,026 New Jetter capability available in 2027 Shouldering 3,162.50 Encompasses daily and large-scale (full crew) shoulder repair Vegetation (Mowing, Trimming, Brushing, Spraying) 5,627.50 State sections = mowed 1x + vision mowing, 5% of network received VMP spraying; County sections = 2x mowed + vision mowing, 98% of network received VMP spraying Encroachment Removal 353 Hazard and non-hazard removal Litter Control 206.25 Car Killed Deer (CKD) Minimal Contracted service; administration just coordinates database inputs for pickup P rimary Goals: Complete all state mowing prior to the 1st of July. Reduce overall mowing and invasives along the roadway while improving public safety through herbicides and inhibitors, proactive roadside maintenance, and an emphasis on water management (drainage). K ey Performance Indicators: ROADSIDE MANAGEMENT Mandate(s): Ordinance 16.24 County Trunk Highway Maintenance and Improvement Standards; State Statute 83.065 County Road and Bridge Fund – Tax Levy. 58 of 72 10 ASSET MANAGEMENT – DIVISION S implified Level of Service Statement: Facilities Management supports safe, reliable, and efficient operation of County-owned buildings by performing routine, preventive, and corrective maintenance. Work includes daily repairs, scheduled inspections, life-cycle equipment upkeep, pest control, building security and safety, energy management, project management, and coordination of contracted services when specialized expertise is required. The division ensures that essential building systems—HVAC, electrical, plumbing, structural components, and public-service spaces—remain operational, compliant, and well maintained to support County departments and public use. B elow are common services managed by the Facilities Section of the Asset Management Division: Maintenance Activity Approximate Labor Hours Remarks Routine Work Orders 18,009 Daily building repairs, control systems adjustments, mechanical adjustments, and corrective actions of varying complexity are executed as issues arise. Preventive Maintenance 4,657 Scheduled equipment servicing (HVAC filters, lubrication cycles, seasonal inspections, safety systems testing) designed to reduce failures and extend asset life. Project Management (small (up to $40k) projects led by Maintenance Technicians) No Prior Data Available Project management activities encompass the disciplined initiation, planning, execution, monitoring, and closeout of projects to ensure adherence to scope, schedule, budget, and quality. Winter Operations 1,207 Winter operations include facility winterization, storm readiness activities, generator reliability checks, and coordinated support for departmental needs during winter events and operational surges. Building Security & Energy Management No Prior Data Available Key Control, Security Systems Management, Energy Management Contracted Specialty Work No Prior Data Available Vendor-performed repairs and upgrades for systems beyond in-house capability (advanced HVAC diagnostics, major plumbing failures, specialized electrical repair, structural reinforcement). P rimary Goals: Maintain a safe, functional, and code-compliant built environment for County employees, public visitors, and operational partners. Reduce same-day reactive work orders by strengthening preventive maintenance scheduling. Ensure timely completion of PM work orders to reduce long-term equipment failures and operational disruptions. Optimize resource use by coordinating vendor services efficiently and leveraging in-house crews for routine and predictable maintenance. FACILITIES MANAGEMENT Mandate(s): Ordinance 16-10(b)(3), which charters Facilities staff with the responsibility to maintain the good working order and long-term functionality and maintenance of the facilities. Also, Ord. 16-31(c) outlines by what standards facilities are to be maintained. 59 of 72 11 K ey Performance Indicators: E stimated Operating Budget Allocation (Facilities Maintenance): Location (SF) Total Utilities2 Facilities Maint. ($/SF) Cleaning (Weekly Hours)1 Total (Annual Change) Key Budget Highlights Government Center (83,176) $152,500 $287,390 ($3.45) $76,632 (55) $516,522 (5%) Extended cleaning contract to a rare seventh year to reduce overall budget by $114,000. Eliminated $50,000 in requested electricity. Neither change is reflected in the numbers above. Increasing overall budgets for facilities maintenance due to significant building life-cycle milestones, e.g., building mid-life. Sheriff’s Office A&J (249,000) $698,300 $511,855 ($2.05) $82,584 (58) $1,292,739 (4%) Range (8,280) $11,000 $41,095 ($4.96) $5,000 (3) $57,095 (6%) Judicial Center (132,780) $224,300 $387,728 ($2.92) $98,196 (73) $710,224 (2%) HHS (74,987) $107,500 $145,683 ($1.94) $82,872 (58) $336,055 (12%) LHCC3 (105,000) $277,500 $1,495,143 ($14.23) $332,556 (197) $2,105,199 Lakeland School (109,900) $279,000 $269,282 ($2.45) $176,388 (140) $724,670 (8.5%) 1 Effective 1 Jun 2027, contract rates increase by 3%, which is reflected in the number above. 2 Reduced electricity request by $50,000, a 4.57 reduction in prior year funding. Department anticipates a hedge of approximately $120,000 in electricity compared to average requirements. 3. A significant increase in building depreciation costs, along with capital outlays, undermines simple comparison analysis between years. 60 of 72 12 S implified Level of Service Statement: The Fleet Management Section maintains all County vehicles and rolling equipment to ensure they are safe, reliable, and ready to support daily operations across Public Works and other departments. Core responsibilities include preventive maintenance, timely repairs, lifecycle planning, and coordination of vendor services for specialized work. The division aims to maximize equipment uptime, extend asset life, and maintain replacement schedules that support operational efficiency and long-term cost management. B elow are common services of the Fleet Section of the Asset Management Division: Maintenance Activity Approximate Labor Hours Remarks Preventive Maintenance (PM) 5,382 Disciplined scheduling and completion of inspections, service intervals, and component renewals to sustain vehicle reliability, minimize downtime, and reduce long‑term operating costs. Shop Inventory Management No Prior Data Available Controlled management and reconciliation of fleet maintenance parts through accurate record‑keeping, annual physical counts, and routine spot checks. These processes validate inventory accuracy, identify gains or losses, and support operational readiness and fiscal accountability. Unscheduled Maintenance 5,685 Responding to unexpected mechanical issues or failures requiring immediate repair to restore safe, reliable vehicle operation outside planned service intervals. Life-Cycle Management No Prior Data Available Systematic evaluation of vehicle condition, utilization, and cost trends to determine optimal replacement timing. It supports informed capital planning, right-sizing, and long-term fleet stewardship through structured life-cycle cost analysis and coordinated renewal strategies. Equipment Procurement, Onboarding and Surplus No Prior Data Available Equipment procurement, onboarding, and surplus ensure fleet assets are acquired, commissioned, and retired in accordance with county purchasing procedures and lifecycle requirements, maintaining a compliant, cost‑effective, and operationally aligned fleet. Turnaround Time No Prior Data Available Turnaround Time measures the elapsed time between the initiation of a fleet maintenance request and the vehicle’s return to service. This LOS standard ensures timely and efficient repairs by monitoring work‑order progress, identifying delays, and maintaining predictable service availability across county operations. P rimary Goals: The County Fleet Management section focuses on keeping all vehicles and equipment safe, reliable, and ready to support daily operations. Primary goals include reducing unexpected breakdowns through strong preventive maintenance practices, completing repairs quickly and cost-effectively, and managing the full life cycle of fleet assets—from acquisition and upfitting to replacement and disposal. The section aims to maintain accurate service records, optimize parts inventory and vendor coordination, and ensure that vehicles meet safety and regulatory standards. Together, these goals help the County minimize downtime, control costs, and ensure dependable support for every department that relies on fleet resources. FLEET MANAGEMENT Mandate(s): Ordinance 16-50, which charters the Public Works Department, to provide all general maintenance and major repairs to all County-owned vehicles. 61 of 72 13 K ey Performance Indicators: E stimated Operating Budget Allocation (Fleet Maintenance): Key Budget Highlights: Overall Shop Operations costs are increasing by approximately $50,000 due to higher expenses associated with building costs, depreciation, safety supplies, and department support. However, the total Shop Operations budget appears lower year-to-year because inter- and intra-department shop overhead charges increased substantially. The prior year’s shop overhead was underbilled, resulting in a significant correction for 2027. This correction increases the internal overhead offset (SHP OH OST), which reduces the net Shop Operations total even though actual operating costs have risen. 62 of 72 14 S implified Level of Service Statement: The Parks Management section maintains all County parks, trails, and grounds to ensure they are safe, clean, and accessible for public use. Responsibilities include routine grounds- keeping, facility upkeep, vegetation management, seasonal maintenance, and support for recreational amenities and public events. The division strives to preserve natural areas, maintain infrastructure and provide a welcoming environment that supports outdoor recreation and community enjoyment. Through proactive care, timely repairs, and coordinated resource management, Parks Maintenance ensures County parks remain attractive, functional, and well-maintained for residents and visitors. Maintenance Activity Approximate Labor Hours Remarks Natural Areas Vegetation Management - Parks No Prior Data Available Woodland, prairie, invasive species control mapping and restoration. Turf Management – Parks 546 Mowing and string trimming Facility Upkeep – Parks 1,450 Park Checks, general landscaping Landscape Vegetation Management - Campus 1,353 Focus on shrubs, trees, naturalized areas, and non-turf vegetation, including nutrition and/or herbicide management. Turf Management - Campus 1,237 Mowing and string trimming Trail Maintenance 556 Trail maintenance (mowing/ brushing); Signage; Bridge/ Railing Maintenance Winter Operations (Plowing) 1,336 Plowing and de-icing operations Public Event Support No Prior Data Available Support for MOU partners entails coordinating authorized park/trail use, ensuring adherence to partnership terms, and maintaining safe, orderly conditions during partnered activities. Facilities Maintenance 56 Repair and maintenance of playgrounds, shelters, and other park amenities Facilities Development No Prior Data Available Developing new facilities (Trails, Playgrounds, Etc.) P rimary Goals: The Parks Section aims to maintain safe, clean, and accessible parks, trails, and grounds that support year-round public use and community enjoyment. Core goals include preserving natural areas through effective vegetation management, controlling invasive species, and protecting sensitive habitats. The section maintains and repairs park infrastructure—such as shelters, playgrounds, restrooms, signage, and trails—to ensure reliability and safety. Seasonal responsibilities include storm cleanup, snow management on walkways, and preparing recreational areas and facilities for peak use. The team also supports community events, enhances park aesthetics through consistent groundskeeping, and promotes efficient resource management by coordinating staff, equipment, and materials effectively. Together, these goals sustain high-quality public spaces, extend the life of park assets, and provide welcoming environments for residents and visitors. PARKS MANAGEMENT Mandate(s): Chapter 16-11 and Chapter 42 of the WALCO Ordinance outline the regulated use of County property (parks & grounds) but do not outline a specific mandate to the Department on maintenance standards. However, Administrative Procedure 2-112, Parks, Grounds and Green Space Management, outlines maintenance standards and department requirements. 63 of 72 15 K ey Performance Indicators: E stimated Operating Budget Allocation (Park Maintenance): Location Labor & Benefits Ops Total (Annual Change) Key Budget Highlights Parks & Trails Admin $56,864 $42,325 $99,189 (-8.6%) Natureland is the focus of a collaboration project to improve pavement in 2027. White River Trail is also a focus area for a collaboration project. F ull deployment of robotic mowers in 2027 will influence the redistribution of funding in the out years. Exploration and coordination for a 4th park continue. Natureland Park $18,140 $40,792 $58,932 (25.5%) Price Park $33,120 $14,252 $47,372 (-25%) White River Park $53,360 $44,945 $98,305 (11.4%) White River Trail $58,720 $9,400 $68,120 (128.6%) County Complex Trail $1,840 $0 $1,840 (103.3%) Snowmobile Grant $0 -- $102,200 64 of 72 16 SOLID WASTE PROGRAM S implified Level of Service Statement: The Walworth County Solid Waste Program provides safe, accessible opportunities for residents, businesses that are very small quantity generators and agricultural operators to properly dispose of hazardous materials. The program delivers two semi-annual Household Hazardous Waste, agricultural waste, businesses that are very small quantity waste generators and electronic waste collection events, helping prevent environmental contamination, reduce landfill impacts, and keep waste out of public right-of-way. A prescription drug drop box is available 24/7 in the Sheriff’s Department lobby for recycling prescription drugs. Through coordinated planning, public outreach, and responsible material handling, the program ensures hazardous, electronic, prescription drug and agricultural wastes are managed in a safe, compliant, and environmentally responsible manner. P rimary Goals: The Clean Sweep, or County Recycling Program, aims to protect public health and the environment by ensuring hazardous household, electronic, and agricultural waste is collected and disposed of safely. Key goals include preventing pollution, reducing landfill impacts, and discouraging illegal dumping by providing accessible, well-advertised collection events. The program seeks to increase or sustain current levels of community participation through education and outreach, promotes responsible waste-handling practices, and maintains compliance with state and federal disposal regulations. Together, these goals support environmental stewardship, safeguard groundwater and soil, and provide residents with a reliable way to manage hazardous materials responsibly, with minimal or reduced impact on the County levy. K ey Performance Indicators: Mandate(s): There are no regulatory requirements to run a County Clean Sweep (Solid Waste/Recycling) Program. NR 187 outlines guidance on grant requirements for state funding. 65 of 72 17 E stimated Budget Allocation: Key Budget Highlights: Anticipated state grant funding is slightly down, and long- term revenues from Mallard Ridge are threatened. Meanwhile, the popularity of the Clean Sweep and recycling programs is growing, with approximately $111,341 in county levy required to meet anticipated program requirements – tons of waste collected. Revenues are estimated at $75K from Mallard Ridge and $33K from state grants and donations. The department is seeking to establish new vendor connections to improve program cost-effectiveness, leverage social media to cut advertising, and leverage more volunteer labor. 66 of 72 18 HIGHWAY INFRASTRUCTURE W alworth County aims to sustain an average PASER rating of 7.0 across the highway network. Major maintenance and improvement projects are scheduled through the 10-Year Highway Improvement Plan to replace pavement, bridges, culverts, and other critical assets. The county also centrally manages all bridge inspections, along with local programs. Culverts in poor condition (Category ≤4) are prioritized for repair or replacement in line with funding availability and CIP schedules. P rimary Goals: Restore the County highway network to a PASER rating of seven (7) or higher. Prioritize major maintenance or replacement for dams, large culverts, and bridges classified as fair or poor. Maintain smaller culverts in good to fair condition and coordinate their replacement with scheduled roadway improvement projects. K ey Performance Indicators: Mandates: Ordinance 16.24 County Trunk Highway Maintenance and Improvement Standards; State Statute 83.065 County Road and Bridge Fund – Tax Levy. 67 of 72 19 K ey Budget Allocations: Es timated Budget Requirements (5-Year CIP): Key Budget Highlights: As noted in the roadway section, the County has established a new budget initiative to fund ultraviolet (UV) culvert lining. This approach will allow the County to repair culverts and extend their service life until the next scheduled road improvement project. NOTE: The County's strategy also assumes significant federal and state funding for projects. Key Budget Highlights: The department is programmed for a significant increase in local bridge inspections due to normal biannual and quadrennial requirements. 68 of 72 20 F ACILITIES/PARKS INFRASTRUCTURE W alworth County Project Managers are among the county's hardest-working staff members and lead new construction, remodel, and refurbishment projects. Department project managers ensure projects minimize operational disruptions, keep county staff and patrons safe, and maintain the facilities' good working order, long-term functionality, and maintenance. P rimary Goals: Maintain county facilities in good state of repair. Sustain facilities in accordance with the primary mission of the department and in line with the Facilities Master Plan(s). Remain adaptive and flexible to change. Complete assigned projects in a reasonable timeline with no serious disruption to critical operations of a department. K ey Performance Indicators: Mandates: Ordinance Sec. 16-31 Maintenance of Facilities Master Plan(s) and Facilities 69 of 72 21 1. Wi sDOT Winter Maintenance Categories: WisDOT has five (5) roadway categories that determine priority, level of service, and hours of operation. Within Walworth County, we maintain category 3-5 level of roads as outlined below: C ategory 3: All other four-lane highways (AADT< 25,000) All lanes and ramps will be maintained with emphasis on plowing and sensible salting. However, the driving lanes and ramps will receive preferential treatment. The passing lane will receive less attention. Plowing with less salting will be done on the passing lane. C ategory 4: Most high-volume two-lane highways (AADT >= 5,000) and some two- lanes (AADT < 5,000) The driving lane will be maintained with emphasis on plowing and sensible salting. C ategory 5: All other two-lane highways The driving lane will be maintained primarily by plowing with minimal salting. *AADT = Average Daily Traffic 2. P avement Surface Maintenance or Surface Maintenance: This category includes all activities associated with maintaining and preserving the driving surface of County roadways. Work such as crack filling, chip sealing, remediation oil treatments, and distressed pavement repair is conducted throughout the maintenance year. Seasonal conditions dictate when each treatment can be applied. Crack filling is typically carried out in spring and fall, when temperatures are suitable for proper adhesion. Chip sealing and Reclamite occur during the warm summer months when curing is most effective. Distressed pavement repair is performed throughout the construction season and on an emergency basis whenever the road surface deteriorates to a point where drivability or safety is affected. 3. D itch & Drainage Maintenance: This category covers the maintenance of all roadside drainage features, including ditching, culvert cleanouts, and culvert repairs/replacements. Work is performed year-round, with scheduled ditching most often occurring during warmer, drier months when soil conditions allow heavy equipment to operate safely. Culvert replacements happen both proactively and reactively, especially following storms, washouts, or flooding. Drainage maintenance is also conducted whenever standing water, erosion, or roadway undermining becomes evident during inspections or after weather events. Level of Service Clarifications 70 of 72 22 4. S houlder Maintenance: Shoulder maintenance includes restoring gravel/asphalt millings on paved County roadways, correcting edge drop-offs, and addressing shoulder erosion. Most shoulder work occurs during the construction season, from late spring through fall, when material placement and compaction can be completed effectively. Shoulder repairs also occur immediately after heavy rains, rapid snowmelt, or traffic-related degradation. Inspection findings throughout the year help identify unsafe shoulder conditions requiring timely corrective action. 5. E ncroachment Removal: Highway encroachment removal tasks prioritize the immediate elimination of critical safety hazards in the public right-of-way, followed by the scheduled removal of non-hazardous unauthorized objects during routine maintenance. Examples include fallen debris, collapsed structures, illegal signage, unpermitted storage, etc. 6. S ignage and Traffic Control Device (TCD) Maintenance: This category includes the repair, replacement, installation, and maintenance of roadway signs and traffic control devices across County roads. The County does not fabricate its own signs but installs and maintains them to ensure compliance with MUTCD standards. Signage maintenance is performed whenever signs are damaged, knocked down, faded, obstructed by vegetation, or changed due to regulatory updates. Ensuring visibility and compliance is a year-round responsibility. 7. P avement Markings: Pavement marking maintenance includes application and renewal of centerlines, fog lines, and other roadway striping. Most work is performed in late spring through summer when warm conditions support proper curing of paint materials. Additional applications or touch-ups occur as needed throughout the season when markings fade, or after resurfacing/maintenance projects. 8. V egetation Management: Vegetation management encompasses all roadside vegetation work conducted throughout the year. During the growing season, beginning in early spring and continuing into fall, the County performs selective herbicide treatments, invasive species control, and Plant Growth Regulator applications to manage roadside vegetation, reduce mowing frequency, and maintain clear sightlines at intersections. These treatments are scheduled during periods of active plant growth to ensure maximum effectiveness, but reactive vegetation management may occur at any point in the season when overgrowth creates visibility concerns or safety hazards. Vegetation management also includes tree trimming and brushing operations, which occur primarily during the winter months. Winter provides ideal conditions for this work because trees are dormant, reducing stress and promoting healthier regrowth. Frozen ground improves equipment access to off-road locations and minimizes damage to shoulders and ditches. During this period, crews remove overhanging limbs, nuisance branches, dead wood, and brush that could impede visibility, obstruct signage, threaten roadway safety, or interfere with equipment during other maintenance operations. These trimming and brushing activities ensure long-term roadside stability while preventing vegetation-related hazards in subsequent seasons. 71 of 72 23 9. Guardrail & Impact Attenuator Maintenance: This category includes the repair, replacement, and upgrading of guardrails and impact attenuators throughout County roadways. Work is performed year-round in response to crash damage, deterioration, or inspection findings. Maintenance prioritization is based on roadway classification, hazard proximity, and safety risk, ensuring these roadside protection systems function properly under all conditions. 10. Car Killed Deer (CKD): Car-killed deer removal is a County responsibility performed through an approved contractor using a piggyback arrangement on the State contract. Removal occurs as needed whenever wildlife-vehicle collisions result in carcasses within the roadway or along the shoulder. Contractors respond promptly upon notification from appointed County officials to maintain roadway cleanliness and eliminate hazards. 11. County Bridge Maintenance: County bridge maintenance includes the full range of activities required to preserve structural integrity and ensure continued safe passage over County-owned bridges throughout the year. County crews perform routine work such as deck cleaning, joint and drain flushing, patching deck surfaces, brush cutting around structures, removing timber or debris, and concrete repair at abutments and wing walls whenever conditions allow. Many of these tasks are scheduled during warmer months to support proper curing of materials, though emergency maintenance can occur at any time in response to flooding, debris accumulation, storm damage, or issues revealed through inspections. In addition to the work performed by internal staff, Walworth County also relies on qualified vendors and specialized contractors when maintenance needs exceed internal capabilities, require specialized equipment, or demand technical expertise beyond what County crews are equipped to provide. Vendor-performed work may include larger-scale concrete rehabilitation, structural repairs, slope stabilization projects, advanced washouts, specialty material applications, or complex drainage corrections. Public Works coordinates these contracted services to ensure compliance with engineering standards, regulatory expectations, and industry best practices. 12. Preventive Maintenance (Fleet): Preventive Maintenance (PM) in fleet management refers to the scheduled, proactive servicing of County vehicles and equipment to keep them safe, reliable, and operational. PM includes routine tasks such as oil changes, safety inspections, tire and brake servicing, fluid replacements, and mechanical adjustments performed at set intervals to prevent breakdowns and extend asset life. By prioritizing PM, the County reduces costly reactive repairs, minimizes vehicle downtime, and ensures that essential equipment is consistently available to support daily operations across departments. 72 of 72

Source: Walworth County website. First collected Oct 8, 2026.