September 2026
Report to the Mayor, City Council, City Administrator and City Comptroller
From the City of Lake Geneva Avian Committee
2027 City of Lake Geneva Committee Budget Overview and Narrative for 2027 and
Report on 2026 Progress toward our Strategic Objectives
On behalf of the City of Lake Geneva Avian Committee, thank you for your support of
our efforts to meet our strategic goals and objectives on behalf of and in service to, our
fellow citizens.
Executive Summary of the Budget Request for 2027
In order to meet the core requirements and to continue to advance our strategic
objectives, we are requesting
• $6775
Our planned expenditures are estimated at $6775 with an increase over previous
budgets due to two factors: unable to carry over unexpended funds from
previous budgets, and our intent to grow our very successful Purple Martin
Colony that has outgrown our current housing opportunities.
BUDGET PRIORITY #1 APPLICATION TO BIRD CITY WISCONSIN
We are requesting $175 as the application fee for Bird City Wisconsin. This is
central for our mandated mission.
2026 Progress
Despite the complicated process of completing the revised Bird City Application we
were once again awarded the highest High Flyer Bird City status.
BUDGET PRIORITY #2 SWIFT NIGHT OUT
We are again requesting $800 for the September 9, 2027 Swift Night Out event at
the Geneva Lake Museum. This is one of our major community outreach and
education events. We are grateful for the support of the Geneva Lake Museum as our
co-host and for preserving the old, brick chimney that is key to chimney swift survival,
and the focus of this event. This budget item provides funds for a speaker and indoor
program, publicity and educational materials. We have added food trucks to our event
so there is no need for us to request funds for refreshments.
2026 Progress
Swift Night Out was held on September 4, 2025. We had another packed house for the
indoor program (nearly 200), Eagle and Friends by Schlitz Audubon, and at least
another 50 people joined us outside for the “show” the birds put on to a thrilled
audience, including clapping and cheering as the swifts circled and dropped into the
majestic chimney. From a public outreach standpoint, we were able to impact at least
250 people of all ages, not just about the wonderful birding opportunities our community
offers, but also about steps everyone can take to help preserve our natural environment
and our birds. Special thanks to Community State Bank for joining us and handing out
FREE ice cream. (This year the event will be held on September 10, 2026).
BUDGET PRIORITY #3 PURPLE MARTIN COLONY
We are requesting $4000 for the continued care and maintenance of the Purple
Martin houses along the Lakeshore Path in Library Park and our annual
membership in the Purple Martin Conservation Association. Our request this year is to
add two more Purple Martin Houses to our Lakefront Colony to meet the needs of
our returning birds; our current houses are at total capacity. The request also
includes some needed hardware replacement, nesting materials and replacement of
parts due to wear and tear, as well as power washing the nesting boxes as a precaution
against bird flu and other deadly viruses. In an effort to save a huge amount of time for
the Public Works staff we now leave the bird houses in place over the winter which
requires additional preparations by our Volunteers.
2026 Progress
This Spring and Summer marked the 8th successful season for the Lake Geneva Purple
Martin Colony which continues to flourish. All eleven houses had activity and more than
160 new Purple Martins hatched and fledged out of our colony. Our colony is now a
critical part of national efforts to save this declining bird species. This “bird path” along
our lakefront brings joy to our community members and visitors; and an added benefit is
helping to keep our lakefront free of insects.
In terms of public engagement and education, our Volunteer Committee members
participated in events sponsored by the Avian Committee by providing information about
our Purple Martins, and showcasing our colony. Our very engaging program on Climate
Change and Dark Skies’ effects on the bird population was a great opportunity to
showcase our Purple Martin colony and hand out materials about birding, migration, and
birdwatching
BUDGET PRIORITY #4 BIRD STRIKE MATERIALS
We are requesting $100 in our budget this year to provide information about bird strikes
– one of the highest threats to bird population. There are myriad resources for
homeowners, builders and building departments about materials to reduce bird strikes
that we will provide throughout the community.
2025 Progress
Providing a very public effort to educate citizens about bird-window strikes is an
important component in our overall performance on area 3 in our Bird City application -
limiting or removing threats to birds. We have researched educational efforts and
materials and implemented posts on our Facebook page and Instagram with the
inclusion of education on anti-window strike devices in our outreach activities.
BUDGET PRIORITY # 5 WORLD MIGATORY BIRD DAY CELEBRATION
We are requesting $750 to support activities related to the City of Lake Geneva
World Migratory Day (WMBD) Celebration.
This celebration is part of the core mission of the committee as established in the
Ordinance and is key to fulfilling our mandated mission. The Community Celebration
plans are evolving for our May 2027 event, which will focus on community education of
factors affecting our bird populations. The plans are intended to work in partnership with
efforts by the Rotary Club, the Library, the Friends of Hillmoor, as well as the City Parks
Department. We also plan to maintain and improve our family-friendly Storybook Trail at
Four Seasons Nature Preserve, inviting student groups to create and share their work
as citizen scientists, authors and illustrators.
Progress in 2026
As required, the City Council passed a Resolution to celebrate World Migratory Bird Day
in Lake Geneva.
As we transitioned away from the Learning to Soar project at St Frances School (due to
retirement of participating teacher), we reached out into our community in different
ways. We refreshed the sign posts for our Storybook Trail at Four Seasons (special
thanks to Public Works and Parks departments) so that families may continue to enjoy
the trail and educational storybooks created by students. As part of our Bird City
requirements, we held an informative and engaging program at the Geneva Lake
Museum on how the Dark Skies initiative is affecting bird populations, presented by a
speakers from Yerkes Observatory and the Geneva Lake Conservancy. We also had a
display of materials on home gardening for birds and pollinators, and an update on our
Purple Martin colony. Activities
BUDGET PRIORITY #6 COMMUNITY OUTREACH
We are requesting $50 in this category to support our efforts in coordinating the
Backyard Bird Count, as well as our participation in the Parade of Trees at the Geneva
Lake Museum. Other Outreach activities are covered in different sections of the budget
request.
Progress in 2026
Again, we supported community efforts to promote families and individuals to participate
in the Backyard Bird Count through our Facebook and Instagram posts, and with
information supplied to our local schools and Library. We expanded local exposure to
our activities and projects by presenting a Tuesday @ 2 program at the Museum on
Dark Skies, a growing initiative to protect birds.
We maintained the Storybook Trail with the new signage and refreshed Storybook, as
well as the entrance way bulletin boards. Ongoing public awareness has been achieved
through Facebook, Instagram and the Regional News.
BUDGET PRIORITY #7 BIRD WATCHING KITS AND MAPS
We are asking for $400 in our budget request. We will be using funds from our 2027
budget to maintain this project, should any of the hotel site backbacks need materials
Progress in 2026
Last year we completed a new program, Bring Birders to Lake Geneva, by putting
together bird watching kits in backpacks (similar to the popular ones at the library), to be
“loaned” to visitors using our local hotels, and the Visitor Center. The kits include
binoculars, bird watching guides, newly revised local maps for birding, information about
Hillmoor and other City of Lake Geneva Parks, and may be borrowed at hotel desks by
their guests. The kits were funded through 2025 budget monies, a special donation by
the Lake Geneva Rotary Club and a Tourism Commission Grant for the marketing
materials, including appropriate logos and other recognitions.
We are very excited about this project and have already received positive feedback
from several hotels. We have 10 backpacks in local hotels.
BUDGET PRIORITY # 8 BUILDING PARTNERSHIPS
We have $500 in this budget category as it is a high priority in our planning. We are
presently considering partnerships with the Library, the Parks Department, the Park
Board, the Tree Board and especially with the Friends of Hillmoor. Over the next year
we hope to continue to brainstorm and plan programs and services that meet our goals
of protecting our bird populations, providing public education, and expanding
opportunities for our residents to enjoy the many natural areas and experiences our
community offers.
Progress in 2026
This year we were able to participate, as the City of Lake Geneva Avian Committee, in a
number of community events, including the aforementioned Swift Night Out, Tuesday
@2 at the Geneva Lake Museum and the newly installed native planting Garden at
Hillmoor, in partnership with the Friends of Hillmoor and Bird City Wisconsin. We
installed a Kestral House at Hillmoor as well, with the help of the Friends of Hillmor and
the Audubon Society. Members advocated for the protection of our Swift Chimney at
City Council meetings with the planned upgrade to the utility installation behind the
Museum, and worked to rewrite the City’s ordinance regarding Dark Skies. We
welcomed community members to our Committee meetings on a regular basis, and
collaborated with the Tree Board and Park Board to support their initiatives.
Item Date Item Detail
1 Bird City Wisconsin March 1 $175
Application fee $175
2 Swift Night Out September 9 $800
Speaker $500
Publicity $200
Educational materials $100
Refreshments $0
3 Purple Martin Colony
Growth and maintenance annual $4,000
Additional houses $3,000
Nest material $400
Maintenance $600
4 Bird Strike Campaign annual $100
educational materials $100
5 World Migratory Bird Day Celebration
Community Celebration May $750 Publicity $100
& Storybook Trail Materials $100
Maintenance $50
Speaker (Topic TBD) Speaker $500
6 Community Outreach ongoing
$50
Museum Parade of Trees $0
School programs Bird Count $50
7 Bird Watching Kits and Maps $400 Printing materials $200
Library Maintenance $100
Hotels Maintenance $100
8 Building Partnerships
Hillmoor projects, other $500.00 TBD $500
Total Planned Expenditures $6,775
2027 Budget Request $6,775
2027- City of Lake Geneva Avian Budget Request
September 11, 2026
Laura Pisarcik
Finance Director/Comptroller
City of Lake Geneva
626 Geneva St.
Lake Geneva, WI 53147
Dear Ms. Pisarcik,
The Geneva Lake Museum requests financial support from the City of Lake Geneva in the amount of
$13,000 to support its 2027 operating budget. This request is unchanged from previous years and we
appreciate the past support.
Attached is the 2027 operating budget for the Geneva Lake Museum for your review. I or a museum
representative will be present at the September meeting to answer any questions.
Sincerely,
Michael Ploch
Treasurer
Proposed 2027 Geneva Lake Museum Budget
Ordinary Income/Expenses
Income
41000 - Direct Public Support
41200 - Donations $30,000
41300 - Donation Jar $1,500
41400 - City of LG $13,000
Total 41000 - Direct Public Support $44,500
48000 - Grants
48500 - LG Tourisn Commission $10,000
48400 - Angell Foundation $90,000
Total 48000 - Grants $100,000
421000 - Fund Raising Income
42180 - Fundraiser Bingo $12,000
42307 - PizzaPalooza $5,000
42367 - Appeal Letters $20,000
42367-Legacy of Imagination Kickstarter $0
42100 - Fundraising other $500
Total 421000 - Fund Raising Income $37,500
43100 - Gift Shop
43130 - Sales $25,000
Total 43100 - Gift Shop $25,000
45000 - Facility Rental Income
45100 - Mill Street Centre $1,000
45200 - Main Street $1,000
Total 45000 - Facility Rental Income $2,000
46400 - Other Types of Income
44200 - Interest $1,500
46420 - Memorials $1,000
46440 - Tuesday @ 2 $500
Total 46400 - Other Types of Income $3,000
47200 - Program Income
47230 - Membership Dues $20,000
47240 - Admissions $75,000
47250 - Tours $4,000
Total 47200 - Program Income $99,000
Total Income $311,000
Gross Profit
Expenses
50000 - Cost of Sales
50350 - Gift Shop Purchases $11,000
50400 - Other $1,000
Total 50000 - Cost of Sales $12,000
52000 - Fundraising Events
52300 - Appeal Letters $500
52189 - New Exhibit - Kickstarter $0
50200 - Fund Raising Events - Other $10,000
Total 52000 - Fundraising Events $10,500
60900 - Business Expenses
60920 - Business Registration Fees $10
60930 - Building Rent $1
Total 60900 - Business Expenses $11
62100 - Contract Services
62110 - Accounting $6,500
62150 - Outside Contract Services $18,000
Total Contract Services $24,500
62500 - Credit Card Fees $5,000 $5,000
62800 - Office equipment
62840 - Equip Rental and Maintenance $2,750
62800 - Office Equipment - Other $1,000
Total 62800 - Office Equipment $3,750
65000 - Operations
65020 - Postage / Mailing Service $750
65030 - Printing & Copying $2,500
65040 - Supplies - office $4,000
65045 - Supplies Building $2,500
65046 - Display Expense $5,000
65047 - Membership supplies $500
65048 - Archive Supplies $250
65049 - Web Site $400
65050 - Telephone - Communications $8,000
65052 - Cell Phone $700
65060 - Advertising & Promotion $7,500
65070 - Dues & Subscriptions $1,500
65080 - Miscellaneous $1,000
65090 - Office Equipment $500
65091 - Repairs & Maintenance $5,100
00000 - Landscaping $7,000
00000 - Building Repairs $1,500
Total - 65000 - Operations $48,700
65100 - Other Types of Expenses
65120 - Insurance D and O $475
65125 - Property & General Liability $5,750
65130 - Workmans Comp $525
Total 65100 - Other types of Expenses $6,750
66000 - Payroll Expenses
66001 - Wages $186,000
66002 - Payroll Taxes $13,500
66004 - Interns $0
Total - Payroll Expenses $199,500
68300 - Travel and Meetings
68310 - Conference, Convention, Meeting $250
68320 - Travel $40
Total 68300 Travel and Meetings $290
Total Expenses $311,001.00
Net Ordinary Income -$1
THE LAKE GENEVA HISTORIC PRESERVATION COMMISSION
LAKE GENEVA, WISCONSIN
September 17, 2026
Mayor Todd Krause & Members of the City Council
City of Lake Geneva
626 Geneva Street
Lake Geneva, WI 53147
RE: FUNDING REQUEST FOR THE LAKE GENEVA HISTORI C
PRESERVATION COMMISSION – 2027 CITY OF LAKE GENEVA BUDGET
Dear Ladies and Gentlemen:
I am writing on behalf of the Lake Geneva Historic Preservation Commission to
request funding for our organization for the 2027 fiscal year.
Over the past 30 years, through the efforts of the LGHPC , the City of Lake Geneva
was selected as one of the National Trust for Historic Preservation’s “2009 Dozen
Distinctive Destinations”. We created two National and State Historic Districts : The
700 Block of Main Street Historic District and the Maple Park Historic District . The
Main Street District was officially approved by the Wisconsin State Historical
Society and the Department of Interior in 2002. The Maple Park Historic District
was approved by the State Historical Society a nd Department of Interior in June of
2005. In addition to bringing national recognition to the City of Lake Geneva,
designation as a National and S tate Historic District makes property owners eligible
for federal and state tax credits for restoration and rehabilitation of their buildings.
This encourages the maintenance and upgrading of businesses and homes within the
districts, which in turn increases property values and real estate tax revenues to the
City.
Oak Hill Cemetery is the final resting plac e of many of the founders and earliest
residents of the Geneva Lake area. It was designed by landscape architect H.W.S.
Cleveland and has been noted as a historically significant site by both local
historians and officials of the Wisconsin Historical Society. THROUGH OUR
EFFORTS, IN 2021, OAK HILL CEMETERY WAS NAMED AS AN OFFICIAL
NATIONAL & STATE HISTORIC SITE.
Several years ago, we replaced a number of missing G.A.R. (Grand Army of the
Republic) grave markers at Pioneer and Oak Hill Cemeteries noting veterans of the
Civil War who are buried there. In 2016, we created additional new signs listing the
names, dates and rank of those local Civil War veterans inter red at Pioneer and Oak
Hill Cemeteries.
Over the last 30 years, t he Historic Preservation Commission installed Signs &
Plaques noting Historic S ites throughout the City including: the Historic Railroad
Depot Sign at Williams & North Streets; signs at Pioneer Cemetery; along the lake
path in Library Park noting the history of the Indian path dating back over 2,500
years; at the Old Railroad Bridge noting the significance of the railroad in the
development of Lake Geneva in the late 19 th and early 20 th centuries; at the Geneva
Lake Museum of History which was the original Wisconsin Power & Light Building;
on the south side of Main Street at the Old Mill Race that runs from the lake past the
Museum Building to the White River; and worked with the City to replace the chain
link fence at Pioneer Cemetery with a new wrought iron fence. We created three
historic signs to commemorate the Whiting House & Frank Lloyd Wright Hotel
Geneva, the Lake Geneva Seminary, and the Lake Geneva Public Library and the New
Historic Railroad Site on Sage Street with “ghost footprints” in concrete pavers of the
former Railroad Turntable, Engine House, Water Tower & Section House.
In addition, the Commission continues to promote the Historic Plaque P rogram
whereby property owners can purchase a gold and black plaque with the date of the
construction of their buildin g. The cost of the plaque is $ 265.00 plus tax , and the
program is totally self -sufficient and requires no City funds . To date, almost 100
buildings have received plaques. The Lake Geneva Historic Preservation Commission
wishes to more actively promote the Historic Plaque program.
For 2027, the Historic Preservation Commission has several primary objectives:
• TO PR OTECT AND MAINTAIN HISTORIC PUBLIC LANDMARKS IN THE
CITY OF LAKE GENEVA: There are many historic public structures within
the City of Lake Geneva, such as the Three Graces statue in Flat Iron Park, that
are in need of maintenance and repair. The LGHPC is the local advocate for
protecting and helping to save these historic monuments for future generations by
nominating them as Local Historic Landmarks . We wish to use at least a portion
of our budget to accomplish that goal.
• EDUCATE & ENCOURAGE CITY RESIDENTS TO NOMINATE THEIR
HISTORIC HOMES & SITES AS LOCAL HISTORIC LANDMARKS: There are
also numerous historic homes in Lake Geneva, both in the Maple Park National
& State Historic District and elsewhere. The Lake Geneva Historic Preservation
Commission wishes to use funds to educate and encourage city residents to
nominate their historic homes and properties as Local Historic Landmarks.
• RESTORE AND UPGRADE OUR I -PHONE AND ANDROID SELF-GUIDED
WALKING TOUR PHONE APPS: Several years ago, we developed both I -phone
and Android versions of our Historic Lake Geneva Walking Tour that allow ed
residents and visitors to do self -guided tours of downtown Lake Gen eva and the
Maple Park National Historic District. These phone apps are no longer available
or difficult to access. We would like to restore them and improve public access to
these apps.
• UPDATE AND IMPROVE OUR LAKE GENEVA HISTORIC PRESERVATION
WEBSITE: We have recently been working with the City staff to restore and
update our Lake Geneva Historic Preservation Commission website via the City of
Lake Geneva website. Our objective is to better educate the general public on the
history of Lake Geneva, the importance of historic preservation, and how to access
information regarding local historic structures thr ough the Wisconsin Historical
Society.
• UPDATE AND PRINT EDUCATIONAL MATERIALS SUCH AS THE
“WALKING TOUR OF LAKE GENEVA, WISCONSIN” BOOKLETS: In 2015,
we created an updated version of the booklet “A Walking Tour of Lake Geneva,
Wisconsin”. The booklets are distributed at the Chamber of Commerce, the
Geneva History Museum, the Lake Geneva Public Library and a number of
other locations. Donations from the tours and the distribution of the booklets are
applied toward the cost of printing additional copies. We wish to be able to
continue to distribute the “A Walking Tour of Lake Geneva, Wisconsin” and other
educational materials.
• PROMOTE A HISTORIC RAILROAD HERITAGE TRAIL THROUGH THE
CITY: We continue our efforts to create a Historic Railroad Heritage Trail
through Lake Geneva . We’ ve long felt the need to give more recognition to the
importance of railroads in the history of the City of Lake Geneva . In recent
years we’ve erected Historic Railway Signs at the site of the Lake Geneva
Railroad Depot at Williams and North Streets, on Main Street at the old
Concrete Railroad Bridge, at Broad Street at the site of several Railroad
Warehouses and the Wilbur Lumber Yard , and on Sage Street at the site of the
former Railroad Turntable. Concrete pavers were laid to mark the “footprints” of
the Turntable, Water Tower, Engine Shed and Section House.
• CONTINUE TO WORK WITH THE CEMETERY BOARD ON THE HISTORIC
MARKER PROGRAM AT PIONEER AND OAK HILL CEMETERIES &
CREATING A HISTORIC GARDEN AT THE OAK HILL CEMETERY CHAPEL.
With these objectives in mind, we respectfully request the following budget for 2027:
• COST TO NOMINATE THE RIVIERA AND
OTHER PUBLIC & PRIVATE BUILDINGS AS
“LOCAL HISTORIC LANDMARKS” $3,500.00
• COST TO REPAIR & MAINTAIN EXISTING
HISTORIC SIGNS & POTENTIAL NEW SIGNS,
SUCH AS HILLMOOR & THE LAKE GENEVA
SANITARIUMS $3,000.00
• COST TO FUND & RESTORE EXISTING
I-PHONE & ANDROID
WALKING TOUR PHONE APPS $1,500.00
• FUNDING FOR PUBLIC EDUCATION
PROGRAMS, PRESENTATIONS, NEWSLETTER,
MAILINGS, COPYING, & POSTAGE $ 500.00
• PARTICIPATION IN STATE HISTORIC
ORGANIZATIONS, DUES, & CONFERENCES $ 500.00
• CONTINUING SUPPORT FOR HISTORICAL
MARKER PROGRAM AT PIONEER AND
OAK HILL CEMETERIES $ 500.00
• CONTINUING SUPPORT FOR PROPOSED
HISTORICAL GARDEN AT OAK HILL CEMETERY
CHAPEL BUILDING $ 500.00
________________________________________________________________________
TOTAL FUNDING REQUEST FOR 2027 $10,000.00
The Lake Geneva Historic Preservation Commission respectfully requests that the
Finance Committee and the City Council grant this budget request for the
upcoming year. We feel that preserving the character and architecture of our
community is a key element in maintaining the “small town” charm that we, as citizens
of Lake Geneva, are justifiably proud of. The members of the Lake Geneva Historic
Preservation Commission greatly appreciate the City’s ongoing sup port of our efforts.
Thank you for your consideration.
Sincerely,
Kenneth L. Etten
Chairman / Lake Geneva Historic Preservation Commission
Commission John Halverson Emily Hummell
Members: Louise Rayppy Chris Brookes
Sonja Akright JaNelle Powers / Alderperson
2027 Budget Draft
REVENUE
ASSESSMENT REVENUE
BID Assessment $283,372
BID Assessment - Expansion $49,000
ASSESSMENT TOTAL $332,372
PROGRAM/EVENT REVENUE
OKTOBERFEST $60,000
WINE WALK - Spring $40,000
WINE WALK - Fall
ANNUAL MEETING $500
LEMONADE CRAWL $2,000
SWEET STROLL $6,000
PROGRAM/EVENT REVENUE TOTAL $108,500
FUNDING SOURCES
GRANTS $20,000
MISC SPONSORSHIP $10,000
FUNDING SOURCES TOTAL $30,000
GRAND TOTAL $470,872
EXPENSES
GENERAL
STAFF $124,000
CITY CHARGES $1,000
SOFTWARE/OFFICE SUPPLIES $2,000
ACCOUNTING $3,000
AUDIT $1,500
PROFESSIONAL DEVELOPMENT $6,000
GENERAL TOTAL $137,500
GENERAL MARKETING
WEBSITE/SOCIAL MEDIA/MARKETING $20,000
ASSET DEVELOPMENT $5,000
MAXWELL STREET DAYS $5,000
WE LOVE LOCAL WEDNESDAY $5,000
CHRISTMAS TREE LIGHTING $5,000
HOLIDAY CAMPAIGN $5,000
MARKETING TOTAL $45,000
BEAUTIFICATION
HANGING PLANTERS $35,000
WINTER/HOLIDAY/LIGHTS/PARK $52,720
MURALS $20,000
FLOWER WATER/CLEAN UP $20,000
MISC BEAUTIFICATION & LABOR $20,000
PLACEMAKING PROJECTS $25,000
BEAUTIFICATION TOTAL $172,720
EVENTS
OKTOBERFEST $60,000
WINE WALK Spring $25,000
WINE WALK Fall
ANNUAL MEETING & BID CONNECTS $5,000
LEMONADE CRAWL $5,000
SWEET STROLL $5,000
EVENT TOTALS $100,000
TOTAL EXPENSES $455,220
FINANCIAL SUMMARY
BID ASSESSMENT $332,372
ESTIMATED PROGRAM/EVENT INCOME $108,500
ESTIMATED FUNDING SOURCES INCOME $30,000
PROJECTED BEGINNING CASH $48,500
INCOME TOTAL $519,372
LESS EXPENSES -$455,220
PROJECTED YEAR-END CASH $64,152
Budget assumptions: Certain projects and events may shift between fiscal years based on grant timing,
partnerships, board priorities, weather, or project readiness. Budgeted amounts represent planned spending
authority and may not reflect actual expenditures during the calendar year.
2027 Budget Request Geneva Lake Level Corp.
3,000,000$
*Property Taxes
( 5 Yrs)
Department 2027 2028 2029 2030 2031 TOTAL 1,547,092$ Fund Balance
City Hall and Administration
IT Hardware Replacement 40,000 40,000 40,000 40,000 40,000 200,000 200,000
Software Integration 50,000 35,000 35,000 35,000 35,000 190,000 190,000
Replacement Cameras 30,000 - - - 30,000 30,000
Badger Books-Clerk 12,000 - - - 12,000 12,000
Website package upgrade 12,000 12,000 12,000
Website Update for ADA 35,000 - - - 35,000 35,000
Subtotal 179,000 75,000 75,000 75,000 75,000 479,000
-
Library
Public and staff Computer Replacement 8,000 8,000 8,000 8,000 8,000 40,000 40,000
Envisionware Self-Checkout Kiosk Replacement 16,000 16,000 16,000
Small Meeting Rooms AV Updates 10,000 10,000 10,000
Subtotal 24,000 8,000 18,000 8,000 8,000 66,000
Cemetery
Mower 8,000 8,000 8,500 8,500 9,100 42,100 42,100
Mini Excavator 165,000 165,000 165,000
Mowers-Zero Turns (qty 2) 37,000 37,000 37,000
Leaf Vac 155,000 155,000 155,000
Subtotal 8,000 173,000 163,500 45,500 9,100 399,100
Funding Sources
City of Lake Geneva, Wisconsin
Equipment Replacement Program
2027 thru 2031
PROJECTS BY DEPARTMENT - EQUIPMENT REPLACEMENT (FUND 50)
FUNDED BY TAX LEVY AND FUND BALANCE RESERVES IN EQUIPMENT REPLACEMENT ACCOUNT
1
3,000,000$
*Property Taxes
( 5 Yrs)
Department 2027 2028 2029 2030 2031 TOTAL 1,547,092$ Fund Balance
Funding Sources
City of Lake Geneva, Wisconsin
Equipment Replacement Program
2027 thru 2031
PROJECTS BY DEPARTMENT - EQUIPMENT REPLACEMENT (FUND 50)
FUNDED BY TAX LEVY AND FUND BALANCE RESERVES IN EQUIPMENT REPLACEMENT ACCOUNT
Parking
SUV - - 30,000 - 30,000 30,000
Subtotal - - 30,000 - - 30,000
Department of Public Works
Heavy Plow -Unit #23 365,000 365,000 365,000
Kubota 36,000 36,000 36,000
Rhino Mower 27,000 27,000 27,000
Equipment trailer 35,500 35,500 35,500
Bucket Truck 350,000 350,000 350,000
Beach groomer tractor 85,000 85,000 85,000
Paint shaker 11,000 11,000 11,000
Sprayer Tractor 65,000 65,000 65,000
Bully-Plow 19,500 19,500 19,500
3pt brush mower 14,000 14,000 14,000
Brush truck 311,000 311,000 311,000
Scag-Mower 20,000 20,000 20,000
Beach groomer 82,000 82,000 82,000
Unit #18- 1-Ton Truck 57,000 57,000 57,000
Skid plow 9,500 9,500 9,500
Skid broom 12,300 12,300 12,300
Skid snow blower 17,500 17,500 17,500
Unit #54-Van 42,000 42,000 42,000
SUV 44,000 44,000 44,000
Wood Chipper 85,400 85,400 85,400
Scissors lift 91,000 91,000 91,000
2
3,000,000$
*Property Taxes
( 5 Yrs)
Department 2027 2028 2029 2030 2031 TOTAL 1,547,092$ Fund Balance
Funding Sources
City of Lake Geneva, Wisconsin
Equipment Replacement Program
2027 thru 2031
PROJECTS BY DEPARTMENT - EQUIPMENT REPLACEMENT (FUND 50)
FUNDED BY TAX LEVY AND FUND BALANCE RESERVES IN EQUIPMENT REPLACEMENT ACCOUNT
Unit #36-1/2 Ton Pickup 48,000 48,000 48,000
Unit #17 1-Ton Chipper truck 70,000 70,000 70,000
Unit #134 heavy plow Truck 375,000 375,000 375,000
Unit #135 Heavy plow Truck 375,000 375,000 375,000
Mosquito sprayer 31,000 31,000 31,000
12 Ft Equipment trailer 18,000 18,000 18,000
Stump Grinder 35,000 35,000 35,000
Subtotal 909,500 429,500 264,300 294,400 834,000 2,731,700
Fire Department
Turnout gear - (10) sets per year 82,500 90,750 99,825 109,808 120,788 503,671 503,671
Ambulance 2891 (2019) 300,000 300,000 300,000
Ambulance #2891 Equipment 28,000 28,000 28,000
Ambulance 2892 (2005) 300,000 300,000 300,000
Ambulance #2892 Equipment 28,000 28,000 28,000
Car #2871 (2019) 110,000 - 110,000 110,000
Car #2872 (2020) 80,000 - 80,000 80,000
Squad #2861 (2007) 500,000 500,000 500,000
Squad #2861 Equipment 48,000 48,000 48,000
Dive Rescue Equipment 75,000 75,000 75,000
TRT Equipment 30,000 30,000 30,000
TEMS Ballistic Vests 15,000 15,000 15,000
EMS UTV 95,000 95,000 95,000
Subtotal 725,500 633,750 179,825 452,808 120,788 2,112,671
3
3,000,000$
*Property Taxes
( 5 Yrs)
Department 2027 2028 2029 2030 2031 TOTAL 1,547,092$ Fund Balance
Funding Sources
City of Lake Geneva, Wisconsin
Equipment Replacement Program
2027 thru 2031
PROJECTS BY DEPARTMENT - EQUIPMENT REPLACEMENT (FUND 50)
FUNDED BY TAX LEVY AND FUND BALANCE RESERVES IN EQUIPMENT REPLACEMENT ACCOUNT
Police Department
Vehicle 200-2021 Chevy Tahoe (Admin) 83,000 83,000 83,000
Vehicle 202-2013 Ford Interceptor Utility (Admin-Det) - 83,000 83,000 83,000
Vehicle 203-2020 Ford Interceptor Utility 83,000 83,000 83,000
Vehicle 204-2024 Ford Interceptor Utility - 83,000 83,000 166,000 166,000
Vehicle 205-2023 Ford Interceptor Utility 94,600 94,600 94,600
Vehicle 206-2024 Ford Interceptor Utility 94,600 - 94,600 94,600
Vehicle 207-2021 Ford Interceptor Utility 83,000 83,000 83,000
Vehicle 209-2025 Ford Interceptor Utility 83,000 83,000 83,000
Vehicle 210-2024 Ford Interceptor Utility 83,000 83,000 83,000
Vehicle 211-2014 Ford Pickup truck - 83,000 83,000 83,000
213-2023 Ford Interceptor Utility 83,000 - 83,000 166,000 166,000
215-2025 Ford Interceptor Utility 83,000 83,000 83,000
220-2023 Ford Interceptor Utility - 83,000 83,000 83,000
Primary Fleet 83,000 83,000 83,000
Digital fingerprint system 30,000 30,000 30,000
UAV drone with live deck 25,000 25,000 25,000
Subtotal 219,200 274,000 332,000 249,000 332,000 1,406,200
TOTALS 2,065,200$ 1,593,250$ 1,062,625$ 1,124,708$ 1,378,888$ 7,224,671$ 7,224,671 -
*City allocates $600,000 per year to Equipment, the total for 5 years is $3,000,000
4
3 Year
Department 2027 2028 2029 2030 2031 TOTAL Bonding
Dontations/
Grants
Impact/Other
Fees Fund Balance
Cemetery
Oak Hill Cemetery Roads (reallocated DPW asphalt from DPW 2024) 300,000 300,000 300,000 900,000 900,000
Kubota 25,000 25,000 25,000
Chapel PH II Rehab, SHPO 140,000 140,000 140,000
Bell Bucket 8,000 8,000 8,000
Pioneer-Fence paint 10,000 10,000 10,000
Rhon Tower Install for Internet 5,000 5,000 5,000
Cameras 6,000 6,000 6,000
Survey for West Section Platting 35,000 35,000 35,000
Columbarium 80,000 80,000
Grave Stone Repairs 35,000 15,000 15,000 15,000 15,000 95,000 65,000
Front Pillar Tuckpoint 35,000 35,000 35,000
Grapple for JD Mid Size 8,000 8,000 8,000
Topsoil Building Improvements 92,500 92,500 92,500
GPS Grave Location 45,000 45,000
Gas Trailer/Tank 5,300 5,300 5,300
Tuckpoint/Rehab Entrance Pillars 5,000 5,000
Building Improvements 53,000 53,000
Subtotal 554,000 460,500 320,300 65,000 148,000 1,547,800
City Hall and Administration
Zoning Ordinance Rewrite 100,000 100,000 100,000
Pillar Improvements 106,000 106,000
Elevator Improvements-PD 60,000 350,000 410,000 60,000
Garage Door, LED Upgrade-Police 52,000 52,000 52,000
Locker Room Upgrade (qty 2) 20,000 100,000 120,000 20,000
Exterior Doors 50,000 50,000 -
Main Water Heater and Tank 38,000 38,000 38,000
Windows 160,000 160,000
Exterior Renovation, Soffits, Tuckpointing, Etc. 287,000 287,000
Exterior Concrete 110,000 110,000
Subtotal 232,000 38,000 - 497,000 666,000 1,433,000
Department of Public Works
Road paving/improvement 2,865,000 2,865,000 2,865,000 2,865,000 2,865,000 14,325,000 8,595,000
Drainage Improvements on Roads and Alleys 495,000 495,000 495,000 495,000 495,000 2,475,000 1,485,000
Sidewalk/Ramp Improvements 420,000 420,000 420,000 420,000 420,000 2,100,000 1,260,000
Parking Lot Improvements 105,000 105,000 105,000 105,000 105,000 525,000 315,000
Alley Reconstruction 160,000 160,000 160,000 160,000 160,000 800,000 480,000
Multiuse Path Improvements 110,000 110,000 110,000 110,000 110,000 550,000 330,000
Crack sealing 60,000 60,000 60,000 60,000 60,000 300,000 180,000
Seal Coating 150,000 150,000 150,000 150,000 150,000 750,000 450,000
Storm sewer repairs/replacement 30,000 30,000 30,000 35,000 35,000 160,000 90,000
Funding Sources
City of Lake Geneva, Wisconsin
Capital Improvement Program
2027 thru 2031
PROJECTS BY DEPARTMENT - CAPITAL PROJECTS (FUND 43)
FUNDED BY CAPITAL BORROWING AND FUND BALANCE RESERVES
1
3 Year
Department 2027 2028 2029 2030 2031 TOTAL Bonding
Dontations/
Grants
Impact/Other
Fees Fund Balance
Funding Sources
City of Lake Geneva, Wisconsin
Capital Improvement Program
2027 thru 2031
PROJECTS BY DEPARTMENT - CAPITAL PROJECTS (FUND 43)
FUNDED BY CAPITAL BORROWING AND FUND BALANCE RESERVES
Hwy 50 road improvement project (shared with State of WI) 400,000 400,000 400,000 1,200,000 1,200,000
Decorative Signal Polies Hwy 50 70,000 70,000 70,000
S LSD Railing across from Burger King removable railings for Grates-updates 27,000 27,000 27,000
South Lake Shore Drive Drainage Analysis 20,000 20,000 20,000
Hwy 120 100,000 100,000 100,000
Center Street Culvert 240,000 240,000 240,000
Sidwalk Programs 65,000 65,000 65,000 65,000 65,000 325,000 195,000
Meadowlands Pond 100,000 100,000 100,000
Screen Deck with Conveyor 210,000 210,000 210,000
Hot Patcher/Roller 101,000 101,000 101,000
Carpet, Windows, Ceiling DPW Office 45,000 45,000 45,000
RTV 55,000 55,000 55,000
1070 Backup Generator 50,000 50,000 50,000
Ventrac with Briner 60,000 60,000 60,000
Fencing, DPW and Gate 68,000 68,000 68,000
Vets Park Pickup Truck 90,000 90,000 90,000
1065 Lighting Ship and Lot 50,000 50,000 50,000
40 X 60 Shed 4 Seasons 200,000 200,000 200,000
1070 Carey Expansion Shed 60 X 120 1,200,000 1,200,000 800,000 400,000
900-1200 block Main St lighting 250,000 250,000 250,000
1070 Carey, Police Impound storm sewer 125,000 125,000 125,000
DPW Campus asphalt/concrete 275,000 275,000 275,000
Half Ton Pickup Truck 45,000 45,000 45,000
Air exchange unit, paint booth 1070 Carey 55,000 55,000 55,000
Fuel station, deck, ladder, canopy 160,000 160,000 160,000
Waterfall pond,(next to typewriter factory) 55,000 55,000 55,000
DPW, on Elkhorn Rd information scrolling sign - 35,000 35,000 -
Storm sewer, Hwy H and Cemetery Rd 11,000 11,000 11,000
Floor, drains, 1070 Carey main building 120,000 120,000 -
Compact Mini Utility Loader 70,000 70,000 -
Grapple for backhoe 12,000 12,000 -
Sidewalk updates, Public buildings 125,000 125,000 -
Hot paint all main roads 85,000 85,000 85,000
Pesticide storage area - 45,000 45,000 45,000
Subtotal 7,484,000 5,890,000 4,998,000 4,702,000 4,590,000 27,664,000 -
Lakefront
Main Sign-on Riviera 7,500 7,500 7,500
HVAC LL Main Hall 73,000 73,000 73,000
Bird Mitigation 15,000 15,000 15,000
Ballroom Floor 60,000 60,000 60,000
Water Obstacle Course 80,000 80,000 - 80,000
ADA Kayak Launch/Fishing Pier 100,000 100,000 50,000 50,000
Riviera Fountain Improvements 152,000 152,000 152,000
2
3 Year
Department 2027 2028 2029 2030 2031 TOTAL Bonding
Dontations/
Grants
Impact/Other
Fees Fund Balance
Funding Sources
City of Lake Geneva, Wisconsin
Capital Improvement Program
2027 thru 2031
PROJECTS BY DEPARTMENT - CAPITAL PROJECTS (FUND 43)
FUNDED BY CAPITAL BORROWING AND FUND BALANCE RESERVES
Brass Dance Floor Railing Improvements 10,000 10,000 10,000
Exterior Concrete Sand/Seal 45,000 45,000 45,000
Beach House/Renovations/ ADA Entrance 200,000 200,000 -
West End Pier 1,900,000 1,900,000 1,400,000 500,000
Riviera Pier 810,000 810,000 810,000
Exterior Building Improvements 72,000 72,000 -
Exterior Railings/Walls Improvements 55,000 55,000 -
Beach Sun Canopies 50,000 50,000 -
Subtotal 187,500 958,000 2,107,000 322,000 55,000 3,629,500
Library
Roof replacement 300,000 300,000 300,000
Overhang Structural Improvement 35,000 35,000 35,000
Gutter, Downspout, and site drainage improvements 20,000 20,000 20,000
Building and Fire Alarm improvements 75,000 75,000 75,000
Front Door & Book Improvements 32,000 32,000 32,000
Access Control & Security Camera System Updates 30,000 30,000 30,000
Interior Improvements 15,000 15,000 15,000
Envisionware Self-Checkout Kiosk 16,000 16,000 16,000
24 X & Materials Pick Up Locker Addition 30,000 30,000 30,000
South Lawn Fixtures 30,000 30,000 30,000
Window Replacement 25,000 25,000 25,000
Exterior Sidewalk & Entrance Improvement 25,000 25,000 25,000
HVAC replacement 80,000 80,000 80,000
Water Heater Replacement 8,000 8,000 8,000
West End Reconstruction 100,000 200,000 2,000,000 2,300,000 2,300,000
Collection Shelving 60,000 60,000 60,000
Furnishings: Seating and Tables 50,000 50,000 50,000
Wayfinding and Signage 35,000 35,000 35,000
Exterior Masonry Tuckpoint/Sealing 60,000 60,000
Interior Finishes Reconstruction 15,000 15,000
Restroom Improvements 40,000 - 40,000 40,000
Landscaping & Site Work 30,000 30,000
Subtotal 708,000 313,000 2,185,000 105,000 - 3,311,000
Geneva Lake Level Corp.
Mill Pond 286,062 - - - - 286,062 71,516 214,547
Subtotal 286,062 - - - - 286,062
Museum
Tuckpoint Building/Chimney - 285,000 285,000
Tail Race Pond Wall 155,000 155,000 155,000
3
3 Year
Department 2027 2028 2029 2030 2031 TOTAL Bonding
Dontations/
Grants
Impact/Other
Fees Fund Balance
Funding Sources
City of Lake Geneva, Wisconsin
Capital Improvement Program
2027 thru 2031
PROJECTS BY DEPARTMENT - CAPITAL PROJECTS (FUND 43)
FUNDED BY CAPITAL BORROWING AND FUND BALANCE RESERVES
Flat Roof Replacement 450,000 450,000
Window Upgrade 84,000 84,000
Lot Paving 82,000 82,000
Subtotal - - 155,000 369,000 532,000 1,056,000
Fire Department
Cardiac Monitors 240,000 240,000 240,000
Engine 1,350,000 1,350,000
703 Marshall Remodel-Separate Bonding -
Public Safety Building-Separate Bonding -
Subtotal - 240,000 - 1,350,000 - 1,590,000
-
Parks and Rec Capital Projects
Library Park Walkways 95,000 95,000 95,000
Court lighting upgrades-Tennis, Pickleball and Basketball 20,000 20,000 20,000
Asphalt/Concrete Approach Vets Maintenance Shed 56,000 56,000 56,000
West End Restroom Building Updates 75,000 75,000
Parking Lot Lights Upgrade LED 135,000 135,000
Reconfigure Grates at East End of Donian 14,000 14,000 14,000
3-Sisters' Statue-replacement 350,000 350,000 350,000
Manning Way Bike Trail Bridge 65,000 65,000 65,000
Skate Park Improvements 100,000 100,000
Replacement/ Combination Vets Park Garage 450,000 450,000
Dunn Field Concession Building Floors and Fixtures 32,000 32,000
UTV 35,000 35,000 35,000
Park Planning 90,000 90,000 90,000
Park Drinking Fountains 10,000 10,000 10,000 10,000 10,000 50,000 30,000
ADA Enhancements 25,000 25,000 25,000 25,000 25,000 125,000 75,000
Playground-Relocation of Oak Hill Tot Lot 300,000 300,000 300,000
Playground-Vet's Park Improvement 75,000 75,000 75,000
Upgrade Lighting at Diamonds and Installation of Path lighting-Vet's Park 300,000 300,000 300,000
Playground, Shelter, Sports Area-Rushwood Park 1,000,000 1,000,000 1,000,000
Benches-Parks 50,000 50,000 50,000
Splash Pad, Shelter, Playground-Seminary Park 2,500,000 2,500,000
Outdoor Exercise Equipment 200,000 200,000 200,000
Dog Park/Parking-Hillmoor 650,000 650,000 325,000 325,000
Ecological Restoration-Hillmoor 75,000 75,000 50,000 200,000 100,000 100,000
River Restoration Plan-Hillmoor 55,000 55,000 55,000
Trail Completion-Hillmoor 575,000 575,000 287,000 288,000
Zone 2-5 Planning-Hillmoor 60,000 60,000 60,000
Whiteriver Ecological Enhancements-Hillmoor 300,000 300,000 300,000
Shade Feature for Pickleball-Dunn Field 40,000 40,000 40,000
Native Planting 50,000 50,000 50,000
4
3 Year
Department 2027 2028 2029 2030 2031 TOTAL Bonding
Dontations/
Grants
Impact/Other
Fees Fund Balance
Funding Sources
City of Lake Geneva, Wisconsin
Capital Improvement Program
2027 thru 2031
PROJECTS BY DEPARTMENT - CAPITAL PROJECTS (FUND 43)
FUNDED BY CAPITAL BORROWING AND FUND BALANCE RESERVES
Playground Equipment-Westgate 300,000 300,000
Park Signs-All Parks 80,000 80,000 80,000
Playground-Cobb Park 750,000 750,000
Shelter, Amenities-Vets Park 1,500,000 1,500,000
4 Seasons Preserve-Improvements (Boardwalk, Trails, Amenities) 160,000 100,000 260,000
Subtotal 2,000,000 2,081,000 684,000 6,005,000 167,000 10,937,000
TOTALS 11,451,562$ 9,980,500$ 10,449,300$ 13,415,000$ 6,158,000$ 51,454,362$ 23,626,816 3,780,000 4,474,547 -
5
1 | Page
D:\Walworth_Co\Lake Geneva_City\Gov\260136_2026_Lake_Geneva_Street_Program_PW\CIP\Report\DraftReport_20260807.docx
City of Lake Geneva
Capital Improvement Plan (CIP)
Recommendations for the annual capital improvement budget include the following:
$2,865,000 for roadway resurfacing (1.12 miles of local roads for 30-year cycle & 1.0 miles of
Arterials/collectors for 20-year cycle)
$495,000 for Drainage Improvements on roads and alleys
$420,000 for sidewalk/ramp improvements (25% on 2.0 miles)
$105,000 for parking lot improvements (14000 SF annually for 30-year cycle)
$160,000 for alley reconstruction (850-ft (2 blocks) of allies per year for 30-year cycle)
$110,000 multiuse path improvements (40-year cycle, 1300/LF per year average)
Maintenance
$60,000 – Crack sealing program (9.5 miles for a 5-year cycle)
$150,000 – Seal Coating Program (3.2 miles for a 15-year cycle)
Special Projects (additional considerations)
$20,000 - South Lake Shore Drive drainage analysis
$65,000 – Sidewalk Program (approx. 3 blocks of new sidewalk or other)
In 2019 Kapur and city staff last evaluated the average annual improvement budget and
provided recommendations for future expenditure on roadway resurfacing, parking lot
improvements, alley reconstruction, pedestrian path and sidewalk improvements. Past road
programs from 2019-2025 (except for 2022) were analyzed to compare allocation of
resources to the 2019 recommendations. Several trends emerged:
1. In general, the 2019 recommendations for scopes of improvements do not change; however,
the estimated cost to complete the same scope is significantly higher. Figure 1 below shows
the relationship of dollars spent on roadway improvements relative to miles of road
completed. Road improvement costs are increasing. Recommendation: Increase budget
to maintain infrastructure condition.
2. A larger percentage of road program funds are being used for sidewalk, crosswalk and ramp
improvements. This is not unexpected given that in 2024 the Department of
Transportation adopted Proposed Right-of-Way Accessibility Guidelines (PROWAG)
requirements which require upgrades to pedestrian access routes when roadways are
altered or repaired. Figure 2 below shows the categories of improvements completed with
the street program each year. 2023 was an end of borrowing cycle and the budget was
tight, so pedestrian accommodations were pushed to the 2024 program. Recommendation:
Incorporate PROWAG required pedestrian improvements into roadway budget for the
2| Page
D:\Walworth_Co\Lake Geneva_City\Gov\260136_2026_Lake_Geneva_Street_Program_PW\CIP\Report\DraftReport_20260807.docx
recommended 2.5 miles. Have a separate sidewalk program budget for priority
pedestrian improvements not associated with road construction.
3. Since 2019, the road program has incorporat ed few storm sewer system upgrades or
replacements. Existing storm sewer infrastructure continues to age and should be
evaluated before yearly road program scopes and cost estimates are prepared.
Recommendation: Televise storm sewer system in advance to plan for
upgrades/replacements.
4. Traditionally alleys have been reconstructed or resurfaced without adding drainage
improvements. Recommendation: Include minor drainage improvements for alleys in the
budget per the above estimate.
5. Past practices of minimal early maintenance strategies has kept the lifetime of roads to
approximately 20-years before a resurfacing is required. Lifetime of local road can
reasonably extend to 30-years with early and continued crack sealing. Recommendation:
Increase crack sealing budget to “buy time” before resurfacing of roads are required.
Figure 1: Roadway Miles Improved 2019-2025
0.00
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
2.00
$0
$100
$200
$300
$400
$500
$600
2019 2020 2021 2023 2024 2025
Miles
Cost ($)
Thousands
Roadway Cost vs Miles Reconstructed (2019-2025)
Roadway Cost Miles Reconstructed
3| Page
D:\Walworth_Co\Lake Geneva_City\Gov\260136_2026_Lake_Geneva_Street_Program_PW\CIP\Report\DraftReport_20260807.docx
Figure 2: Street Program Summary by Year
1. Roadway Pavement Analysis
The roadway pavement analysis for the City of Lake Geneva Capital Improvement Plan (CIP)
began with the compilation and integration of roadway inventory and condition data from the
Wisconsin Information System for Local Roads (WISLR). Historical PASER ratings, a
standardized visual rating system to evaluate pavement conditions, were incorporated into a
GIS-based framework for project prioritization.
WISLR PASER Rating data sets from 2004 to 2025, including over 600 roadway segments,
were compiled to evaluate current and past road maintenance practices and calculate an
average deterioration curve to use for predictive maintenance planning.
1.1 Condition
Pavement condition ratings are evaluated using the PASER system, which provides a
standardized method for visually assessing pavement quality on a scale from 1 (failed) to 10
(excellent). These ratings enable comparison across segments and support prioritization
decisions.
We have completed an assessment of Lake Geneva’s roads, public parking lots, alley’s, multi-
use paths, and the cemetery roadways. The ratings were completed based on WISDOT PASER
ratings, per WI Statures 86.302. The WISDOT PASER rating system is based on a 1-10 rating,
with 1 being a completely failed surface and 10 being a newly constructed surface. This
information is important in planning and budgeting for future improvement projects.
WIDOT PASER ratings recommend the following treatments based on the surface rating:
10/9 – None (newly constructed)
8 – Minimal crack filling
7 – Routine crack filling
6 – May need a sealcoat, possible overlay
$0 $100,000 $200,000 $300,000 $400,000 $500, 000 $600,000 $700,000 $800,000 $900,000
2019
2020
2021
2023
2024
2025
Budget Distribution by Category
Roadway Sidewalk Multi-Use Path Alley Parking
4 | Page
D:\Walworth_Co\Lake Geneva_City\Gov\260136_2026_Lake_Geneva_Street_Program_PW\CIP\Report\DraftReport_20260807.docx
5 – Needs a seal coat or thin non-structural overlay (<2”)
4 – Could use a structural overlay (>2”)
3 – Patching and/or milling and overlay needed
2 – Full reconstruction needed
1 – Full reconstruction needed
A comparative analysis was conducted using historical data (e.g., 2019) and recent condition
data (e.g., 2025) to evaluate trends in roadway condition over time. Figure 3 below, compares
the percentage of roadway miles at each PASER rating in both 2019 and 2025. The graph
below shows almost a doubling of roads rated at a 5 indicating an increasing need for
preventative maintenance and rehabilitation projects. A PASER rating of 5 is where
preservation treatments become critical. While this shows a shift towards deterioration only a
small portion of the roads exist under “poor” condition indicating that the roadway network is
in overall good condition.
Figure 3: Pavement Condition Comparison 2019 and 2025
1.2 Deterioration Curve
Using historical PASER datasets and GIS-based analysis, a deterioration curve was created to
understand the deterioration of city roads. The curve was then used in predicting future
decline of roadway segments for inclusion in the 5-year road program capital improvement
plan. Figure 4 below shows the cumulative average number of years roadway segments
degrade between PASER categories. The curve confirms that on average a roadway segment
has fallen from a 10 to a 5 in approximately 20 years.
Recently the City has increased its maintenance program to include approximately 2.2 miles
of crack sealing to help increase the life span of pavement.
5 | Page
D:\Walworth_Co\Lake Geneva_City\Gov\260136_2026_Lake_Geneva_Street_Program_PW\CIP\Report\DraftReport_20260807.docx
Figure 4: Rate of Roadway Deterioration by PASER rating
1.3 Local Roads Maintenance
Recent years the Department of Public Works has increased its crack filling program to
include 2.2 miles in 2026. WisDOT Highway Maintenance Manual recognizes crack filling is a
pavement preservation strategy that slows deterioration and preserves structural capacity
when applied on pavement in still good condition. Routine crack sealing, every 4-5 years, is
estimated to extend the pavement life by 4-8 years; while crack sealing with sealcoat/chip
seal may extend the life of a road 8-15 years. Longevity depends on traffic, drainage,
pavement thickness, and timing of treatment. For the purposes of capital improvement
planning, we recommend continuing with the practice of crack filing, especially with roadways
that are still in good condition.
Annualizing the total of 48-miles of roads over a 5-year crack sealing cycle, gives
approximately 9.5 miles of crack sealing required per year. Based off recent bid tabulation
data, the annual crack sealing budget to complete 9.5 miles would be $85,000.00. However,
crack sealing is typically most effective on roads at a PASER of 7-8. While the City is
implementing changes to bring average road ratings up, there may initially not be enough
eligible roads. A budget of $60,000.00 annually for crack sealing for the next five years is
recommended. This number should be reconsidered after 5 years as more roads per year may
be eligible and benefit greatly from crack sealing.
Sealcoating generally provides the greatest benefit on pavements with PASER ratings of 6 to
7.
To support a 15-year sealcoating cycle, the City's roadway network should be evaluated on a
recurring basis. With approximately 48 miles of roadway under City jurisdiction, this equates
to treating roughly 3.2 miles annually for a 15-year cycle. Based on recent bid tabulation data,
maintaining a full 15-year cycle would require an estimated annual sealcoating budget of
6 | Page
D:\Walworth_Co\Lake Geneva_City\Gov\260136_2026_Lake_Geneva_Street_Program_PW\CIP\Report\DraftReport_20260807.docx
approximately $150,000. The number of miles for crack sealing should be increased to include
new roads within the first 5 years.
1.4 Roadway Treatment Assumptions
Standardized treatment assumptions were developed to support cost estimation and program
planning. PASER ratings of 5 typically indicate a necessary 2-3” mill and overlay with PASER
4 ratings ranging from resurfacing to reconstruction. A 3% annual increase was considered to
account for inflation. Roadway treatment costs included engineering design and construction
inspection fees as well as curb and gutter replacement. Past project bid unit prices were used
to project planning costs, see Table 1 below.
Table 1: Roadway Treatment Unit Costs
Treatment Units 2026 2027 2028 2029 2030 2031
Mill & OL Spot Curb Repair SY $40.00 $41.20 $42.44 $43.71 $45.02 $46.37
Resurfacing Spot Curb Repair SY $60.00 $61.80 $63.65 $65.56 $67.53 $69.56
Resurfacing Full Curb
Replacement SY $70.00 $72.10 $74.26 $76.49 $78.79 $81.15
Full Reconstruction Spot Curb Repair SY $120.00 $123.60 $127.31 $131.13 $135.06 $139.11
Full Reconstruction Full Curb
Replacement SY $135.00 $139.05 $143.22 $147.52 $151.94 $156.50
1.5 Annual Road Program Considerations
Development of the annual roadway program incorporated known infrastructure
improvements schedules, PASER rating of roadway, active development and geographic
location of road segment. Road segments with lower PASER ratings or ratings that were
predicted to lower in the near future when applying the deterioration curve were given
priority. Segments near Main Street (HWY 50) were avoided in 2027 and 2028 given the
WisDOT construction project timeline. Road segments likely to receive construction traffic
with the development of Symphony Bay Phase 8 were selected for later years if possible.
Road segments in the same vicinity were grouped within the same construction year to
promote efficiency.
2. Sidewalk Improvements
Sidewalk improvements were evaluated as part of the CIP to address goals defined in the
City of Lake Geneva Bicycle and Pedestrian Plan Adopted March 26, 2018. Both
replacement of deficient infrastructure as well as expansion of pedestrian facilities where
gaps exist were estimated. In 2024 the Department of Transportation adopted Proposed
Right-of-Way Accessibility Guidelines (PROWAG) requirements which states “any portion
of a pedestrian facility that is altered must be altered to comply with the guidelines”.
PROWAG standards and City goals require addressing pedestrian circulation within the
public right-of-way such that pedestrian access on both sides of the roadway is
considered for construction to meet this goal. Budgets must include up-front costs for
7 | Page
D:\Walworth_Co\Lake Geneva_City\Gov\260136_2026_Lake_Geneva_Street_Program_PW\CIP\Report\DraftReport_20260807.docx
sidewalk improvements even though property assessments are typically sought for
sidewalk repairs, replacements and new sidewalk connections. Currently ramps, landing
pads, and warning fields for ADA crossings are not assessed.
2.1 Condition
The Lake Geneva Sidewalk Inventory and mapped results identify condition of sidewalks,
intersections and roadway crossings within the City of Lake Geneva. While intended to be
a city-wide evaluation, the full scope is not yet complete. This data collected was used to
determine the existing condition of the pedestrian routes and estimate costs to bring
them into compliance. Unit costs per LF were used in the budgeting analysis based on
each road segment considered in the 5-year plan. New sidewalk connections were
assumed where no sidewalk exists and included in the cost estimate for the streets
program. Limitations to sidewalk construction should be presented if scope is reduced to
sidewalk on one side of the roadway.
2.2 Cost Estimation
Cost estimates for sidewalk improvements were developed using standardized unit costs
from past projects. A 3% annual increase was considered to account for inflation. The
budget spreadsheet uses the estimated unit cost based on the conditions specified, see
Table 2 below. Both sides of the roadway segment were considered.
Table 2: Sidewalk Unit Costs
Sidewalk Units 2026 2027 2028 2029 2030 2031
Spot Repairs – 25% LF $12.50 $12.88 $13.26 $13.66 $14.07 $14.49
Spot Repairs – 50% LF $24.50 $25.24 $25.99 $26.77 $27.57 $28.40
Spot Repairs – 75% LF $35.63 $36.69 $37.79 $38.93 $40.10 $41.30
Remove & Replace All Sidewalk – 100% LF $46.00 $47.38 $48.80 $50.27 $51.77 $53.33
All New Sidewalk LF $35.00 $36.05 $37.13 $38.25 $39.39 $40.57
3. Parking Lots
The Parking lot inventory for capital improvement planning was updated to include both
paid parking locations and paved parking lots under Department of Public Works
maintenance responsibility for total area of 429,000 SF. All parking lots are paved
asphalt over granular base and have a variable service life based on traffic and base
condition. Assuming a service life of 20-years, 21,000 SF of parking lot
resurfacing/reconstruction would be required every year.
3.1 Condition
8 | Page
D:\Walworth_Co\Lake Geneva_City\Gov\260136_2026_Lake_Geneva_Street_Program_PW\CIP\Report\DraftReport_20260807.docx
Each parking lot surface was rated following the WISDOT PASER rating system for
asphalt, see Table 3 below. The graph below includes the breakdown based on the total
parking lot area of 429,000 SF.
Table 3: Parking Lot PASER Ratings
Location Identifier Area (SF) Rating
Geneva Street (Cook and Broad) A 20600 6
Center Street B 9000 6
Sheridan Springs Road C 22000 2
Mill Street D 32600 6
Sage Street E 99300 6
Boat Parking Lot F 26400 9
Geneva Street (Center and Broad) G 18900 7
City Hall Rear H 7600 5
Lakeshore Drive I 34600 9
Veteran’s Park Basketball J 34700 2
Veteran’s Parkway K 55700 5
Veteran’s Park (Townline) L 8400 5
Maple Park M 45100 5
City Hall N 14100 4
Total
429,000
Figure 5: Parking Lot PASER Comparison
3.2 Cost Estimation
In 2024, Lot J was reconstructed for approximately $260,000 which consisted of 34,600
square feet of asphalt pavement, curb and gutter replacement and sidewalk
9 | Page
D:\Walworth_Co\Lake Geneva_City\Gov\260136_2026_Lake_Geneva_Street_Program_PW\CIP\Report\DraftReport_20260807.docx
accommodations. The total cost for this work, including engineering was $271,000. This
equals $74.70/SY at 3% cost increase /year.
Treatment Units 2026 2027 2028 2029 2030 2031
Mill & OL Spot Curb Repair SY $55.00 $56.65 $58.35 $60.10 $61.90 $63.76
Resurfacing Spot Curb Repair SY $66.00 $67.98 $70.02 $72.12 $74.28 $76.51
Resurfacing Full Curb
Replacement SY $76.00 $78.28 $80.63 $83.05 $85.54 $88.10
Full Reconstruction Spot Curb Repair SY $85.00 $87.55 $90.18 $92.88 $95.67 $98.54
Full Reconstruction Full Curb
Replacement SY $95.00 $97.85 $100.79 $103.81 $106.92 $110.13
4. Alleys
Several older neighborhoods within the City have alleys maintained by the Department of
Public Works. These alleys as typically 14-ft wide and are constructed of asphalt on
minimal base coarse aggregate. Alleys have minimal, if any, internal drainage structures.
Past practice has been asphalt repair/replacement without upgrades to drainage
improvements.
4.1 Condition
Alley pavement condition data was updated on GIS to include the 2025 PASER ratings.
Pavement conditions have generally improved from 2019 to 2025 with the graph shifting
to the right noting alleys in better condition, see Figure 6 below. However, approximately
47 % of alleys are still rated at a 5 or lower and in need of maintenance.
Figure 6: Alley PASER Comparison
4.2 Cost Estimation
Table 4: Parking Lot Unit Costs
10 | Page
D:\Walworth_Co\Lake Geneva_City\Gov\260136_2026_Lake_Geneva_Street_Program_PW\CIP\Report\DraftReport_20260807.docx
Table 5: Alley Improvements Unit Costs
Treatment Units 2026 2027 2028 2029 2030 2031
Mill & OL SY $85.00 $87.55 $90.18 $92.88 $95.67 $98.54
Resurfacing SY $100.00 $103.00 $106.09 $109.27 $112.55 $115.93
Full Reconstruction SY $132.00 $135.96 $140.04 $144.24 $148.57 $153.02
Cost Estimation
Table 5 above shows the average unit prices considered for different treatments of alleys.
Cost estimates for each year considered the existing pavement rating to determine the
necessary treatments. The CIP cost estimate spreadsheet includes drainage
improvements which were previously not considered for alleys.
5. Multi-use Paths
Multi-use paths located on city owned parcels/outlots, within easements, or public rights-
of-way are maintained by city staff. Costs of repair and reconstruction of existing paths
are the responsibility of the City and are not currently subject to private property
assessment.
5.1 Condition
The City’s multi-use paths were rated based on the WisDOT PASER rating system
described above. The existing paths were physically ridden and assessed in August of
2025. There are approximately 57,286 linear feet (10.8 miles) of multi-use paths
throughout the City of which 48% are rated a 5 or lower and in need of repair.
Figure 7: Multi-Use Path PASER Rating Comparison
5.2 Cost Estimation
11 | Page
D:\Walworth_Co\Lake Geneva_City\Gov\260136_2026_Lake_Geneva_Street_Program_PW\CIP\Report\DraftReport_20260807.docx
Multi use paths are generally constructed with a 3-4-inch asphalt layer and coarse base
aggregate underneath. Paths received treatments of Mill and Overlay, resurfacing, or full
reconstruct depending on the pavement condition. The worse condition of the pavement
the more expensive the treatment. Table 6 below gives unit costs per treatment through
out a 5-year borrowing cycle.
Table 6: Multi-Use Path Improvements Unit Costs
Treatment Units 2026 2027 2028 2029 2030 2031
Mill & OL SY $35.00 $36.05 $37.13 $38.25 $39.39 $40.57
Resurfacing SY $60.00 $61.80 $63.65 $65.56 $67.53 $69.56
Full Reconstruction SY $80.00 $82.40 $84.87 $87.42 $90.04 $92.74
6. Special Projects
In addition to standard roadway and pedestrian improvements, special projects were
evaluated as part of the CIP development process to address significant infrastructure
needs.
6.1 S. Lakeshore Drive Drainage
Much of S. Lakeshore Drive has a rural section inconsistent with the City’s typical
roadway section. The City has received complaints of stormwater flowing and icing over
the pavement surface and discharged onto private property. The proposed budget
amount of $20,000 would include a drainage study and preparation of recommendations
for drainage improvements for S. Lakeshore Drive at Pine Tree Lane to Campbell St and
from Eugene Drive to South Street.
This is recommended as a separate project as the PASER ratings along S. Lakeshore
Drive do not support it being included in the current 5-year Capital Improvement Plan.
6.2 Sidewalk Program
A separate sidewalk program is recommended such that pedestrian improvements
outside of the road program limits can continue without drawing on road program funds.
It is recommended this be a separate fund for pedestrian improvements such as sidewalk
repairs/replacements, new sidewalks, RRFBs, etc. We recommend a budget of $65,000
be allocated for the program. This is equivalent to approximately 3 blocks of new 5-ft
wide sidewalk.
Route
ame
es prefix,
ype, suffix
tention)
Name
(Includes prefix, name, type, suffix and extention)
At Offset
Name
(Includes prefix, name, type, suffix
and extention)
Toward Offset
(Optional Field)
Segment Length
Section Area (SY)
Maint. Unit Cost
Maintenance
Est. Cost
Drainage
Sidewalk Rate
Sidewalk Total
subtotal
Engineering Fees
15%
Total
ll St Wrigley Dr 0 Seaver Ln 370 370 4_Local Road 1233.3 123.60$ 152,440.00$ 36.05$ 20,007.75$ 172,447.75$ 25,867.16$ 198,314.91$ F
ll St Seaver Ln 0 S Lake Shore Dr 264 264 4_Local Road 880.0 123.60$ 108,768.00$ 36.05$ 19,034.40$ 127,802.40$ 19,170.36$ 146,972.76$ F
ry Rd CTH H 0 Madison St / Oak Hill Dr 1742 1742 4_Local Road 4064.7 41.20$ 167,464.27$ 20,000.00$ 36.05$ 125,598.20$ 313,062.47$ 46,959.37$ 360,021.84$
d St Water St 0 Walworth St 422 422 4_Local Road 1406.7 41.20$ 57,954.67$ -$ 36.05$ 30,426.20$ 88,380.87$ 13,257.13$ 101,638.00$
d St Walworth St 0 Haskins St 422 422 4_Local Road 1406.7 123.60$ 173,864.00$ -$ 12.88$ 10,866.50$ 184,730.50$ 27,709.58$ 212,440.08$ F
St CTH H 0 Wheeler St 581 581 4_Local Road 1678.4 123.60$ 207,455.73$ -$ 12.88$ 14,960.75$ 222,416.48$ 33,362.47$ 255,778.96$ F
St Wheeler St 0 Grant St 422 422 4_Local Road 1219.1 61.80$ 75,341.07$ -$ 12.88$ 10,866.50$ 86,207.57$ 12,931.14$ 99,138.70$
Church Dr Crossover STH 120 / Willow Rd / Pilgrim Church Dr 255 S Lake Shore Dr / Pilgrim Church Dr 3730 3475 2_Minor Arterial 11583.3 97.85$ 1,133,429.17$ -$ -$ -$ 1,133,429.17$ 170,014.38$ 1,303,443.54$
t Center St 0 Sage St 370 370 4_Local Road 1233.3 41.20$ 50,813.33$ -$ 24.46$ 18,102.25$ 68,915.58$ 10,337.34$ 79,252.92$
t Sage St 0 Crawford St 422 422 4_Local Road 1406.7 41.20$ 57,954.67$ -$ 12.88$ 10,866.50$ 68,821.17$ 10,323.18$ 79,144.34$
St Water St 0 Walworth St 422 422 4_Local Road 937.8 41.20$ 38,636.44$ -$ 36.05$ 30,426.20$ 69,062.64$ 10,359.40$ 79,422.04$
St Walworth St 0 Haskins St 475 475 4_Local Road 1055.6 41.20$ 43,488.89$ -$ 36.05$ 34,247.50$ 77,736.39$ 11,660.46$ 89,396.85$
St Haskins St 0 Spring St 475 475 4_Local Road 1055.6 41.20$ 43,488.89$ 15,000.00$ 36.05$ 34,247.50$ 92,736.39$ 13,910.46$ 106,646.85$
St Horace St 0 Tolman St 106 106 4_Local Road 376.9 123.60$ 46,583.47$ 10,000.00$ 24.46$ 5,186.05$ 61,769.52$ 9,265.43$ 71,034.94$ F
St Tolman St 0 Madison St 370 370 4_Local Road 1315.6 123.60$ 162,602.67$ -$ 24.46$ 18,102.25$ 180,704.92$ 27,105.74$ 207,810.65$ F
Dr Campbell St 0 Baker St 475 475 4_Local Road 1583.3 61.80$ 97,850.00$ 12.88$ 12,231.25$ 110,081.25$ 16,512.19$ 126,593.44$
WE Sage/Crawford NS Walworth/Water 312 485.3 135.96$ 65,985.92$ 25,000.00$ -$ -$ 90,985.92$ 13,647.89$ 104,633.81$ F
WE Crawford/Waverly NS Walworth/Water 280 435.6 135.96$ 59,218.13$ 20,000.00$ -$ -$ 79,218.13$ 11,882.72$ 91,100.85$ F
WE Waverly NS Walworth/Water 281 437.1 135.96$ 59,429.63$ 20,000.00$ -$ -$ 79,429.63$ 11,914.44$ 91,344.07$ F
Lot J 3811.0 87.55$ 333,653.05$ 333,653.05$ 50,047.96$ 383,701.01$ F
e Road Veterans Parkway Sonata Way 1050 1050 1166.7 82.40$ 96,133.33$ 96,133.33$ 14,420.00$ 110,553.33$ F
e Road Prairie Wind Drive Southwind Drive 600 600 666.7 82.40$ 54,933.33$ 54,933.33$ 8,240.00$ 63,173.33$ F
3,287,488.65$ 110,000.00$ 395,169.80$ 3,792,658.45$ 568,898.77$ 4,361,557.22$
l Road 1,484,706.09$
Collector 1,133,429.17$
oad 2,618,135.26$
ley 184,633.68$
ng Lot 333,653.05$
Path 151,066.67$
ewalk 395,169.80$
nage 110,000.00$
eering 568,898.77$
otal 4,361,557.22$
Year Totals (Dollars)
2027
At Route Toward Route
efix,
uffix
on)
Name
(Includes prefix, name, type, suffix and extention)
At Offset
Name
(Includes prefix, name, type, suffix
and extention)
Toward Offset
(Optional Field)
Drainage
Sidewalk Rate
Sidewalk Total
subtotal
Heather Cir 0 Joshua Ln 706 706 4_Local Road 2353.3 42.44$ 99,866.05$ -$ 13.26$ 18,724.89$ 118,590.94$ 17,788.64$ 136,379$
Andria Dr / Heather Cir 0 Andria Dr 838 838 4_Local Road 2793.3 42.44$ 118,537.89$ -$ 13.26$ 22,225.86$ 140,763.75$ 21,114.56$ 161,878$
Andria Dr 0 Termini 499 499 4_Local Road 1663.3 42.44$ 70,585.21$ -$ 25.20$ 25,145.98$ 95,731.20$ 14,359.68$ 110,090$
wy Crossover STH 120 0 A St 1162 1162 4_Local Road 5164.4 42.44$ 219,158.36$ -$ 37.13$ 86,293.61$ 305,451.97$ 45,817.80$ 351,269$
wy A St 0 Unknown 158 158 4_Local Road 702.2 42.44$ 29,799.50$ -$ 37.13$ 11,733.55$ 41,533.06$ 6,229.96$ 47,763$
Townline Rd 0 Park Dr 1651 1651 4_Local Road 6604.0 42.44$ 280,247.34$ -$ 25.99$ 85,825.75$ 366,073.09$ 54,910.96$ 420,984$
Park Dr 0 Termini 392 392 4_Local Road 1568.0 42.44$ 66,539.65$ -$ 13.26$ 10,396.82$ 76,936.47$ 11,540.47$ 88,476$
Ct Park Dr 0 Termini 422 422 4_Local Road 1875.6 42.44$ 79,591.08$ -$ 37.13$ 31,338.99$ 110,930.06$ 16,639.51$ 127,569$
Pleasant St 0 Marshall St 53 53 3_Major Collector 176.7 42.44$ 7,497.03$ 15,000.00$ 25.20$ 2,670.82$ 25,167.84$ 3,775.18$ 28,943$
Marshall St 0 Henry St 422 422 3_Major Collector 1406.7 42.44$ 59,693.31$ -$ 25.20$ 21,265.74$ 80,959.05$ 12,143.86$ 93,102$
West St 0 East St 475 475 4_Local Road 1055.6 127.31$ 134,380.67$ -$ 37.13$ 35,274.93$ 169,655.59$ 25,448.34$ 195,103$
East St 0 Curtis St 581 581 4_Local Road 1291.1 127.31$ 164,368.77$ -$ 37.13$ 43,146.80$ 207,515.58$ 31,127.34$ 238,642$
Waverly St 0 Termini 422 422 4_Local Road 1406.7 42.44$ 59,693.31$ -$ 24.46$ 20,646.35$ 80,339.66$ 12,050.95$ 92,390$
Circle Dr 0 Timber Ln 106 106 4_Local Road 353.3 42.44$ 14,994.05$ -$ 37.13$ 7,871.88$ 22,865.93$ 3,429.89$ 26,295$
Timber Ln 0 Ridge Rd 158 158 4_Local Road 526.7 42.44$ 22,349.63$ -$ 37.13$ 11,733.55$ 34,083.18$ 5,112.48$ 39,195$
Ridge Rd 0 Lookout Dr 211 211 4_Local Road 703.3 42.44$ 29,846.65$ 37.13$ 15,669.49$ 45,516.15$ 6,827.42$ 52,343$
Lookout Dr 0 Elmwood Ave / Wisconsin St 211 211 4_Local Road 703.3 42.44$ 29,846.65$ -$ 37.13$ 15,669.49$ 45,516.15$ 6,827.42$ 52,343$
Termini 0 Timothy Dr 317 317 4_Local Road 1021.4 42.44$ 43,346.02$ -$ 37.13$ 23,541.37$ 66,887.39$ 10,033.11$ 76,920$
Laurie St / Mobile St 0 Rush St / Mobile St 739 739 4_Local Road 2463.3 42.44$ 104,534.01$ -$ 37.13$ 54,880.36$ 159,414.37$ 23,912.16$ 183,326$
Laurie St / Mobile St 845 Rush St / Mobile St 898 53 4_Local Road 176.7 42.44$ 7,497.03$ -$ 37.13$ 3,935.94$ 11,432.97$ 1,714.94$ 13,147$
Geneva Pkwy 0 Southwind Dr 53 53 4_Local Road 235.6 42.44$ 9,996.04$ -$ 25.20$ 2,670.82$ 12,666.85$ 1,900.03$ 14,566$
Geneva Pkwy 53 Southwind Dr 939 886 4_Local Road 3937.8 42.44$ 167,103.54$ -$ 25.20$ 44,647.98$ 211,751.51$ 31,762.73$ 243,514$
CTH H 0 Center St 739 739 4_Local Road 2134.9 42.44$ 90,596.14$ -$ 25.20$ 37,240.24$ 127,836.39$ 19,175.46$ 147,011$
NS Spring WE Sage/Crawford 160 248.9 140.04$ 34,854.10$ 15,000.00$ -$ -$ 49,854.10$ 7,478.12$ 57,332$
WE Williams/Center NS Marshall/Ann 590 917.8 140.04$ 128,524.50$ 20,000.00$ -$ -$ 148,524.50$ 22,278.67$ 170,803$
933 70.02$ 65,328.10$ -$ -$ -$ 65,328.10$ 9,799.22$ 75,127$
Bonnie Brae Ln Mobile St 760 844.4 84.87$ 71,669.69$ -$ -$ -$ 71,669.69$ 10,750.45$ 82,420$
Mobile St Romin Rd 520 577.8 63.65$ 36,777.87$ -$ -$ -$ 36,777.87$ 5,516.68$ 42,294$
Romin Rd Wells St 510 566.7 63.65$ 36,070.60$ -$ -$ -$ 36,070.60$ 5,410.59$ 41,481$
Romin Rd Wells St 275 305.6 63.65$ 19,449.83$ -$ -$ -$ 19,449.83$ 2,917.48$ 22,367$
2,302,742.62$ 50,000.00$ 632,551.19$ 2,985,293.82$ 447,794.07$ 3,433,087$
d 1,842,877.60$
ctor 67,190.33$
1,910,067.94$
163,378.60$
ot 65,328.10$
163,967.99$
632,551.19$
50,000.00$
g 447,794.07$
3,433,087.89$
Year Totals (Dollars)
At Route Toward Route
Segment Length
Section Area (SY)
Maint. Unit Cost
2028
Maintenance Est.
Cost
Engineering Fees
15%
Total
fix,
uffix
on)
Name
(Includes prefix, name, type, suffix and extention)
At Offset
Name
(Includes prefix, name, type, suffix
and extention)
Toward Offset
(Optional Field)
Drainage
Sidewalk Rate
Sidewalk Total
subtotal
Rd South St / N Wells St / N Bloomfield Rd 0 North Rd / N Bloomfield Rd 262 5875 2/3 14361.1 147.52$ 2,118,524.47$ 75,000.00$ -$ -$ 2,193,524.47$ 329,028.67$ 2,522,553.14$ Fu
Dodge St / Elmwood Ave 0 Price Pl 528 528 4_Local Ro 1701.3 43.71$ 74,363.71$ -$ 13.66$ 14,424.00$ 88,787.71$ 13,318.16$ 102,105.87$
Price Pl 0 Park Row 158 158 4_Local Ro 509.1 43.71$ 22,252.78$ -$ 13.66$ 4,316.27$ 26,569.05$ 3,985.36$ 30,554.41$
N Bloomfield Rd / North Rd 899 Townline Rd / North Rd 1660 2100 4_Local Ro 4200.0 147.52$ 619,576.21$ -$ -$ -$ 619,576.21$ 92,936.43$ 712,512.64$ Fu
Jefferson Ave 158 Clover St 528 370 4_Local Ro 1644.4 43.71$ 71,877.15$ 10,000.00$ 13.66$ 10,107.72$ 91,984.88$ 13,797.73$ 105,782.61$
Clover St 0 Franklin Ave 106 106 4_Local Ro 471.1 43.71$ 20,591.83$ 5,000.00$ 13.66$ 2,895.73$ 28,487.56$ 4,273.13$ 32,760.69$
Franklin Ave 0 Maxwell St 422 422 4_Local Ro 1875.6 43.71$ 81,978.81$ 10,000.00$ 13.66$ 11,528.27$ 103,507.08$ 15,526.06$ 119,033.14$
Maxwell St 0 Warren St 475 475 4_Local Ro 2111.1 43.71$ 92,274.72$ 10,000.00$ 13.66$ 12,976.13$ 115,250.86$ 17,287.63$ 132,538.49$
Warren St 0 Madison St 422 422 4_Local Ro 1875.6 43.71$ 81,978.81$ 10,000.00$ 13.66$ 11,528.27$ 103,507.08$ 15,526.06$ 119,033.14$
NS Campbell/Baker WE Wrigley/S Lake Shore 400 622.2 144.24$ 89,749.31$ 30,000.00$ -$ -$ 119,749.31$ 17,962.40$ 137,711.71$ Fu
NS Campbell/Baker WE S Lake Shore/Wells 410 637.8 144.24$ 91,993.04$ 30,000.00$ -$ -$ 121,993.04$ 18,298.96$ 140,292.00$ Fu
(City Hall) 1600.0 72.12$ 115,391.97$ -$ -$ 25,000.00$ 140,391.97$ 21,058.80$ 161,450.77$
Rd Wells St Edwards Blvd (STH 120) 2300 2555.6 87.42$ 223,401.96$ -$ -$ -$ 223,401.96$ 33,510.29$ 256912.2591 Fu
3,703,954.79$ 180,000.00$ 92,776.39$ 3,976,731.18$ 596,509.68$ 4,573,240.86$
d 1,064,894.03$
ctor 2,118,524.47$
3,183,418.50$
181,742.35$
t 115,391.97$
223,401.96$
92,776.39$
180,000.00$
g 596,509.68$
4,573,240.86$
Year Totals (Dollars)
At Route Toward Route
Segment Length
Engineering Fees
15%
2029
Section Area (SY)
Maint. Unit Cost
Maintenance Est.
Cost
Total
n Route
Name
des prefix,
type, suffix
extention)
Name
(Includes prefix, name, type, suffix and extention)
At Offset
Name
(Includes prefix, name, type, suffix
and extention)
Toward Offset
(Optional Field)
Segment Length
Section Area (SY)
Maint. Unit Cost
Maintenance
Est. Cost
Drainage
Sidewalk Rate
Sidewalk Total
subtotal
Engineering Fees
15%
Total
St W Main St / STH 50 0 Geneva St 422 422 1_Principal Arter 2813.3 68.09$ 191,569.10$ 10,000.00$ 14.07$ 11,874.12$ 213,443.22$ 32,016.48$ 245,459.70$ R
St Geneva St 0 Wisconsin St 475 475 1_Principal Arter 3166.7 68.09$ 215,628.73$ 10,000.00$ 14.07$ 13,365.42$ 238,994.15$ 35,849.12$ 274,843.27$ R
St Wisconsin St 0 Dodge St 422 422 1_Principal Arter 2813.3 68.09$ 191,569.10$ 10,000.00$ 14.07$ 11,874.12$ 213,443.22$ 32,016.48$ 245,459.70$ R
St Dodge St 0 North St / Williams St 528 528 1_Principal Arter 3520.0 68.09$ 239,688.36$ 10,000.00$ 14.07$ 14,856.72$ 264,545.07$ 39,681.76$ 304,226.83$ R
St Wrigley Dr 0 W Main St / STH 50 1056 1056 2_Minor Arterial 6101.3 135.06$ 824,052.53$ 1,500,000.00$ 14.07$ 59,426.87$ 2,383,479.40$ 357,521.91$ 2,741,001.30$ Full R
St W Main St / STH 50 0 Geneva St 475 475 2_Minor Arterial 2744.4 68.09$ 186,878.23$ 10,000.00$ 14.07$ 13,365.42$ 210,243.65$ 31,536.55$ 241,780.20$ R
St Geneva St 0 Wisconsin St 475 475 2_Minor Arterial 2744.4 68.09$ 186,878.23$ 10,000.00$ 14.07$ 13,365.42$ 210,243.65$ 31,536.55$ 241,780.20$ R
St Franklin Ave 0 Maxwell St 370 370 3_Major Collecto 1068.9 68.09$ 72,784.15$ 10,000.00$ 14.07$ 10,410.96$ 93,195.11$ 13,979.27$ 107,174.38$ R
St Broad St 0 Center St 528 528 3_Major Collecto 2346.7 68.09$ 159,792.24$ 10,000.00$ 14.07$ 14,856.72$ 184,648.95$ 27,697.34$ 212,346.30$ R
St Center St 0 Sage St 528 528 4_Local Road 2112.0 68.09$ 143,813.01$ 10,000.00$ 14.07$ 14,856.72$ 168,669.73$ 25,300.46$ 193,970.19$ R
ms St Broad St / North St 0 North St 110 110 4_Local Road 342.2 45.02$ 15,406.97$ 14.49$ 3,188.00$ 18,594.97$ 2,789.25$ 21,384.21$
a St Maxwell St 0 Warren St 475 475 4_Local Road 1583.3 68.09$ 107,814.36$ 10,000.00$ 14.07$ 13,365.42$ 131,179.78$ 19,676.97$ 150,856.75$ R
a St Warren St 0 Madison St 475 475 4_Local Road 1583.3 68.09$ 107,814.36$ 10,000.00$ 14.07$ 13,365.42$ 131,179.78$ 19,676.97$ 150,856.75$ R
a St Broad St 0 Center St 475 475 3_Major Collecto 2638.9 68.09$ 179,690.61$ 10,000.00$ 14.07$ 13,365.42$ 203,056.03$ 30,458.40$ 233,514.43$ R
e Dr Lake Shore Dr 0 Evergreen Ln 158 158 4_Local Road 421.3 151.94$ 64,018.94$ -$ 26.73$ 8,446.94$ 72,465.88$ 10,869.88$ 83,335.77$ Full R
een Ln Lakewood Dr 0 Lake View Dr 475 475 4_Local Road 1266.7 151.94$ 192,462.01$ 39.39$ 37,423.17$ 229,885.17$ 34,482.78$ 264,367.95$ Full R
hore Dr Lakewood Dr 0 Lake View Dr 845 845 4_Local Road 2253.3 151.94$ 342,379.78$ 27,000.00$ 14.07$ 23,776.37$ 393,156.15$ 58,973.42$ 452,129.58$ Full R
hore Dr Lake View Dr 0 Hillside Dr 370 370 4_Local Road 986.7 151.94$ 149,917.77$ 27,000.00$ 14.07$ 10,410.96$ 187,328.73$ 28,099.31$ 215,428.04$ Full R
ood Dr Lake Shore Dr 0 Evergreen Ln 422 422 4_Local Road 1125.3 151.94$ 170,987.30$ 92,500.00$ 39.39$ 33,247.53$ 296,734.83$ 44,510.22$ 341,245.05$ Full R
ood Dr Evergreen Ln 0 Orchard Ln W 369 369 4_Local Road 984.0 151.94$ 149,512.59$ 92,500.00$ 39.39$ 29,071.89$ 271,084.48$ 40,662.67$ 311,747.16$ Full R
rd Ln W Lakewood Dr 0 Lake View Dr 317 317 4_Local Road 845.3 151.94$ 128,443.07$ -$ 39.39$ 24,975.04$ 153,418.11$ 23,012.72$ 176,430.82$ Full R
4,021,101.45$ 1,859,000.00$ 388,888.62$ 940,348.51$ 7,209,338.58$
cal Road 1,572,570.16$
al/Collector 2,448,531.29$
Road 4,021,101.45$
Alley -$
king Lot -$
ke Path -$
dewalk 388,888.62$
rainage 1,859,000.00$
ineering 940,348.51$
Total 7,209,338.58$
Year Totals (Dollars)
2030
At Route Toward Route
e
efix,
suffix
on)
Name
(Includes prefix, name, type, suffix and extention)
At Offset
Name
(Includes prefix, name, type, suffix
and extention)
Toward Offset
(Optional Field)
Drainage
Sidewalk Rate
Sidewalk Total
subtotal
r W Main St / STH 50 0 Orchard Ln W 581 581 4_Local Road 1936.7 156.50$ 303,092.21$ 26,000.00$ 14.49$ 16,838.46$ 345,930.66$ 51,889.60$ 397,820.26$ Ful
r Orchard Ln W 0 Orchard Ln 158 158 4_Local Road 526.7 156.50$ 82,424.39$ 26,000.00$ 14.49$ 4,579.13$ 113,003.52$ 16,950.53$ 129,954.05$ Ful
r Orchard Ln 0 Evergreen Ln 215 215 4_Local Road 716.7 156.50$ 112,159.77$ 26,000.00$ 14.49$ 6,231.10$ 144,390.86$ 21,658.63$ 166,049.49$ Ful
r Evergreen Ln 0 Evergreen Ln 49 49 4_Local Road 163.3 156.50$ 25,561.99$ 26,000.00$ 14.49$ 1,420.11$ 52,982.10$ 7,947.32$ 60,929.42$ Ful
r Evergreen Ln 0 Lake Shore Dr 317 317 4_Local Road 1056.7 156.50$ 165,370.45$ 26,000.00$ 14.49$ 9,187.25$ 200,557.69$ 30,083.65$ 230,641.35$ Ful
Lake View Dr 0 Hillside Dr 845 845 4_Local Road 2253.3 156.50$ 352,651.17$ -$ 40.57$ 68,571.06$ 421,222.23$ 63,183.34$ 484,405.57$ Ful
Lake View Dr 0 Hillside Dr 475 475 4_Local Road 1266.7 156.50$ 198,235.87$ 40.57$ 38,545.86$ 236,781.73$ 35,517.26$ 272,298.99$ Ful
Evergreen Ln 0 Orchard Ln 369 369 4_Local Road 984.0 156.50$ 153,997.97$ -$ 40.57$ 29,944.05$ 183,942.02$ 27,591.30$ 211,533.32$ Ful
Blvd South St 0 Laurie St 898 898 4_Local Road 2993.3 46.37$ 138,803.75$ -$ 37.13$ 66,688.17$ 205,491.92$ 30,823.79$ 236,315.71$
Dodge St 0 North St 528 528 2_Minor Arterial 2112.0 46.37$ 97,935.47$ 30,000.00$ 14.49$ 30,604.84$ 158,540.31$ 23,781.05$ 182,321.36$
Dodge St 0 North St 528 528 4_Local Road 1760.0 46.37$ 81,612.89$ 20,000.00$ 14.49$ 30,604.84$ 132,217.73$ 19,832.66$ 152,050.39$
Dodge St 0 Park Row 792 792 4_Local Road 2640.0 46.37$ 122,419.34$ 14.49$ 22,953.63$ 145,372.97$ 21,805.95$ 167,178.91$
) Carey St 0 Clover St 317 317 4_Local Road 986.2 42.44$ 41,851.33$ -$ 40.57$ 25,724.29$ 67,575.62$ 10,136.34$ 77,711.96$
) Clover St 0 Maxwell St 634 634 4_Local Road 1972.4 42.44$ 83,702.65$ -$ 40.57$ 51,448.58$ 135,151.24$ 20,272.69$ 155,423.92$
Pioneer Dr 0 Termini 317 317 4_Local Road 986.2 46.37$ 45,732.07$ 14.49$ 9,187.25$ 54,919.32$ 8,237.90$ 63,157.22$
Dr W Main St / STH 50 0 Cass St 1003 1003 3_Major Collector 3343.3 46.37$ 155,033.59$ 20,000.00$ 27.53$ 55,230.72$ 230,264.30$ 34,539.65$ 264,803.95$
Dr Cass St 0 Baker St 422 422 3_Major Collector 1828.7 46.37$ 84,797.03$ 20,000.00$ 14.49$ 12,230.34$ 117,027.38$ 17,554.11$ 134,581.48$
Geneva St 0 Wisconsin St 528 528 4_Local Road 1760.0 46.37$ 81,612.89$ 14.49$ 15,302.42$ 96,915.31$ 14,537.30$ 111,452.61$
Cass St 0 W Main St / STH 50 1109 1109 2_Minor Arterial 3203.8 46.37$ 148,562.26$ 27.53$ 61,067.66$ 209,629.92$ 31,444.49$ 241,074.41$
t Center St 0 Termini 211 211 4_Local Road 703.3 46.37$ 32,614.24$ 40.57$ 17,122.48$ 49,736.72$ 7,460.51$ 57,197.23$
Ridge Rd 0 Hillcrest Dr 528 528 4_Local Road 1760.0 46.37$ 81,612.89$ -$ 40.57$ 42,846.77$ 124,459.66$ 18,668.95$ 143,128.61$
Hillcrest Dr 0 Miller Rd 317 317 4_Local Road 1056.7 46.37$ 48,998.65$ -$ 40.57$ 25,724.29$ 74,722.94$ 11,208.44$ 85,931.38$
WE Maxwell/Madison NS George/Pleasant 250 388.9 153.02$ 59,509.40$ 15,000.00$ -$ -$ 74,509.40$ 11,176.41$ 85,685.81$ Ful
WE Maxwell/Madison NS Pleasant/Park Row 850 1322.2 153.02$ 202,331.97$ 35,000.00$ -$ -$ 237,331.97$ 35,599.80$ 272,931.76$ Ful
H 842
2,900,624.26$ 270,000.00$ 642,053.29$ 3,812,677.54$ 571,901.63$ 4,384,579.18$
ad 5,487,904.46$
ector 486,328.35$
2,638,782.89$
261,841.37$
ot -$
h -$
k 642,053.29$
e 270,000.00$
ng 571,901.63$
4,384,579.18$
Year Totals (Dollars)
At Route Toward Route
2031
Section Area (SY)
Maint. Unit Cost
Maintenance Est.
Cost
Engineering Fees
15%
Total
Segment Length
Lake Geneva Public Library Capital Budget Draft Proposal 2027 - 2031
Project Subproject Notes 2027 2028 2029 2030 2031 TOTALCampus Accessiblity & Collection Capacity ProgramThe west end of the LGPL is a bi-level space housing the adult fiction collection. It is not accessible and cannot be made accessible in its current configuration. This project will renovate the current bi-level space into a single, accessible level. This change loses collection capacity for high-usage items and needs to be replaced. An addition will be made to replace the lost space. Additional improvements will be made to the campus to update signage and wayfinding to current accessibility standards and complete modifications to a currently out-of-compliance sidewalk route. West end reconstruction: bi-level to single level, plus west side addition. FEH estimate; to be re-priced at design completion$100,000.00$200,000.00$2,000,000.00 $2,300,000.00
Collection shelving: replacement and reconfigurationSingle-level layout with compliant aisle clearances; extends into adjacent stacks $60,000.00 $60,000.00
Furnishings: seating and tablesIncludes accessible-height tables, clearances, and a range of seating types. $50,000.00 $50,000.00Wayfinding and signageUpdating interior signage to ADA compliance and digital formats.$35,000.00 $35,000.00
Exterior sidewalk & entrance repairRepair uneven sidewalks and grades to bring them into ADA compliance. $25,000.00 $25,000.00
Interior finishes in reconstructed and adjancent areasPainting and finish work to be conducted at the conclusion of West End construction work. $15,000.00 $15,000.00
Landscaping & site workCampus restoration and beautifcation work after the completion of the reconstruction. $30,000.00 $30,000.00Project Totals: $125,000.00$200,000.00$2,145,000.00$45,000.00$0.00$2,515,000.00
Facility Renewal ProgramThe historic library building requires periodic capital renewal. This program is intended to address the building's needs in a systematic, considered manner to ensure most efficient use of resources.
Roof replacement The previously scheduled roof replacement was deferred due to cost. $300,000.00 $300,000.00
Overhang structural repair and refinishingDeep overhangs take weather abuse (see cracks); bundle with roof project for staging/lift savings.$35,000.00 $35,000.00Gutter, downspout, and site drainage improvementsDone in conjunction with roof repairs.$20,000.00 $20,000.00Building and fire alarm $75,000.00 $75,000.00
Front door & book drop repair & refinish
Front doors are sagging, causing security issues, and the after-hours book drop requires replacement. Restoration work to improve function and extend life will be carried out to front doors and changes to book drop will be incorporated.$32,000.00 $32,000.00Access control & security camera system updatesQuote received from City Hall vendor (Complex)$30,000.00 $30,000.00
Interior finishes in reconstructed and adjancent areasPainting and finish work to be conducted at the conclusion of roof and exterior repair work.$15,000.00 $15,000.00
HVAC replacement
This will address the main building furnances and AC units. Quotes have been acquired from: Zien, Southern Lakes, Southport $80,000.00 $80,000.00Water heater replacementCompleted with the HVAC replacement$8,000.00 $8,000.00Window replacement $25,000.00 $25,000.00
Exterior masonry repointing and sealingPending masonry survey. Prairie-style banded brick detailing; costly to restore if neglected. $60,000.00 $60,000.00
Restroom reconstruction and fixture updatesThe Library's restrooms are heavily used by of library park users, in addition to library patrons, and require refreshing.$40,000.00 $40,000.00Project Totals: $507,000.00$113,000.00$100,000.00$0.00 $0.00 $720,000.00
Programming & Public Service Technology ProgramThree of our heavily used self-service systems reach the end of their life during this capital budget period and require replacement. The new self-pickup locker will extend service hours beyond the building's open hours at a fraction of the cost of extended staffing and allow for access to library resources during Highway 50 reconstruction. Investments will be made into the south lawn area and the small meeting rooms to allow for greater public access to library programming and resources. R'eplenishing the staff and public technology assets during this cycle ensures continued efficient staff operations and allows patron access to needed resources, as part of our core mission.Envisionware self-checkout kiosk replacementReplace end-of-life X11 models with X25S model$16,000.00 $16,000.0024x7 materials pick up locker additionOffsite location $30,000.00 $30,000.00
South lawn fixtures
Interactive elements to help with library programming, particularly family-focused programming, will be installed in the cleared south lawn space. $30,000.00 $30,000.00Public and staff technology replacement cycleComputers and associated hardware$8,000.00$8,000.00$8,000.00$8,000.00$8,000.00$40,000.00
Small meeting rooms AV updateThe AV systems in the highly utilized KC and Swanson meeting rooms will be updated. $10,000.00 $10,000.00Project Totals: $84,000.00$8,000.00$18,000.00$8,000.00$8,000.00$126,000.00
Complete Budget Total:$716,000.00$321,000.00$2,263,000.00$53,000.00$8,000.00$3,361,000.00