Hillmoor
Ecological Restoration Plan
Project Update Meeting August 6, 2026
1937 to 2024
2026 drone
Image
Updates
• Tour with Commercial Logger on black
locust harvest.
• Zone 2 Kayak survey of White River.
• Zone 1 White River banks botanical and
erosional survey.
• Tour with Restoration Contractor on WIS
Treatments (Forestry Mowing and
Herbicide) and Grassed Landings on
White River.
• Ongoing Figure (Map) development.
Woody Invasive Species Management
○ common buckthorn
○ black locust
○ Asian honeysuckles
○ European alder
○ multi-flora rose
○ white mulberry
○ Siberian elm
Management Strategies
mechanical removal and stump herbicide treatments – DO
NOT CUT WIS unless herbicide can be properly applied
the same day.
selective timber harvest (not clear cutting)
prescribed fire
Replant native trees, shrubs, and herbaceous native
species.
Forest Stand Improvement (FSI)
Commercial logger with trees marked by a
professional forester
Selectively remove black locust and select
lower value native trees
Merchantable value of black locust and
utilization for play structures and in stream
structure/aquatic habitat
Crop tree release
Opportunity to create new pockets of light for
reforestation efforts
Encourage oak regeneration and growth of
higher value native trees (crop trees) such as
oaks, maple, hickories, and hackberries
Recommend WIS Removal and
Management for Zone 3.
Historic
oaks vs.
black
locust
Hillmoor Wetlands
Stormwater
management
Target plant communities for Restoration
• Oak Savana
• Floodplain Forest
• Sedge Meadow
• Emergent Wetlands
• Upland Tallgrass Prairie
Next Steps
• White River (Zone 2) Survey Results
• White River Shoreline and Bank
Enhancement Planning
• Budget Development for Woody Invasive
Species Management and Prairie
Restoration
• Public Presentation in late September
• Final Plan Submittal in early December
Questions and
Comments?
Welcome
Hillmoor Commission Meeting
August 6, 2026
Ecological Restoration Plan Update
KN Path Construction Alternatives
Main
GOAL
2nd
Option
3rd
Option
0.65 miles 0.47 miles 0.55 miles
Existing Dog Park
Existing and Proposed
New Dog Parks
New Dog Park
Small Projects for 2026
Update Current Brochure
and Trail Markings
New Brochure
Colored vs B/W
New Map incl. Z1
New Posts
and/or
New Colored
Trail System
QR Code for
newsletter
Trail on Private
Property
New Hiking Trail
On City Land
350 ft. Long
New Bridge near Hwy 50
New Bridge near Hwy 50
Other Small Projects?
LAKE GENEVA’s
Comprehensive Outdoor Recreation Plan
(CORP)
and relationship to the
Hillmoor Plan
Upcoming City Budget Considerations
Potential Hillmoor Budget Requests for:
2027-2031 Capital Improvement Budget
2027 Operating Budget
Budget Objective
Tonight, have a preliminary discussion of project funding
options, and at the upcoming August 13th, 2026 Hillmoor
Commission meeting:
make a final decision on what Hillmoor projects should be
prioritized and make formal recommendation to City
Council for the funding to be included in the City’s 2027
Operating Budget and the City’s 5 Year Capital
Improvement (CIP) Budget: 2027-2031
Keeping a Realistic Perspective
Hillmoor is a BIG project.
Implementation will most likely occur over the next
5 to 10 to 20+ years.
The City has limited financial resources with MANY
operating and capital budget needs including other City
Parks.
The Hillmoor Commission needs to determine its top
funding priorities that will make slow steady progress to
turn Hillmoor into a beautiful park for our residents.
Recap
Zone 1
22 Potential Projects Included in Zone 1 Conceptual Plan
Estimated Project Costs in Zone 1
Possible City Z1 Capital Budget Items: 2027 - 2031
Project Path
Needed
Low Range High Range Donor Funds City Funds
Budgeted
Trail System* T1 Yes $1,300k $5,200k ? ?
Dog Park T1 Yes-S.loop $830k $1,700k ? ?
Dog Park Parking T1 Yes-S.loop $240k $520k ? ?
Disc Golf
Impacted Holes
T1 Yes-S.loop $3k $10k ? ?
River Restore
Plan
T1 No tbd tbd ? ?
Native Plantings
(after path)
T1 Part Yes
Part No
$170k $320k ? ?
ADA Ramp T1 Yes-S.loop $390k $390k ? ?
? ?
*Trail System – South Loop – 0.65 miles, North Loop – 0.39 miles; North Connector – 0.11 miles
Possible Z1 Capital Budget Items: 2027 - 2031
Potential Future Knowles-Nelson Grant?
- Include $250k to potentially match future state
funds for paths or use directly.
Possible Z1 City Capital Budget Items: 2027 - 2031
Project Path Needed Low Range High Range Donor Funds City Funds
Budgeted
Trail System tbd T1 Zones - 3,4,5 $10k $60k ? ? ?
Splash Pad T2 Yes-S.loop $670k $810k ? ?
Large Picnic Shel. T2 Yes-S.loop $510k $920k ? ?
River Access
(b. water nook #?)
T2 Yes-S&N loop $160k $510k ? ?
Small Picnic Shel. T2 No $220k $360k ? ?
Native Plantings
(continued)
T2 Part Yes
Part No
$130k $240k ? ?
Fishing Outcrop? T2 Yes-S.loop $70k $130k ? ?
Disc Golf New
Holes*
T2 No $10k $60k ? ?
*Depends upon ecological restoration progress
Other Possible Z1-5 Capital Budget Items: 2027 - 2031
Completing Small Projects (if not completed in 2026)
- New Trail Marking System
- Cutting New Trail behind Target
- New bridge near Rt. 50
- Park Benches and Picnic Tables
- Others?
Zone 2 – Wetland Trail, Boardwalk, and Bridge – Not considered
until planning for Zones 2 -5 are complete.
Other Possible Capital/Operating
Budget Items: 2027 - 2031
Ecological Restoration Zones 1-5
- Habitat Restoration Plan – Zones 3, 4, and 5
Impactful, Visible – Black Locust Removal
$50k to $200k/year for 5 years?
- Zone 2 Wetland Restoration
- White River Restoration in Zone 1 - $ tbd (first need plan)
River access (“backwater nooks”), riverbank
restoration, riverbed improvements
Proposed River
Access Points
1 -Fishing Outcrop
5 -Riverbank Access
Points, 10 bank
modifications
Proposed River Access Points
Fishing Outcrop - Needs to be located at good fishing
spot. Stone outcrop very expensive.
Could future boardwalk serve as
fishing pier?
Riverbank Access – Grass landings more affordable.
Stone steps very expensive 2 to 4x.
Not all “backwater nooks” need
vs water access and/or access on
both sides of the river.
Proposed River Access Points
If the Hillmoor Commission wants to include river access as a
funding priority, funding the river restoration plan is essential.
Suggested Capital Funding Recommendation:
1) Not pursue a fishing outcrop at this time.
2) Limit the number of access points to 2, 3, or 4 at strategic
locations at this time.
3) Use grass landing approach to reduce cost.
Possible Operating Budget Items for 2027
Planning & Professional Services
- White River Ecological Restoration Plan ($tbd)
riverbank & riverbed, river access points
- Ecological Restoration Project Implementation
Oversight
- Landscape Architectural Conceptual Layout of
Zones 2, 3, 4, and 5.
- Hillmoor Coordinator Consultant
- Engineering-Surveying Property Boundaries
- Survey & Staking as Needed
- Building and Site Design Stds., Protective CCR’s
- Others?
Donor Funds
What Should be the Fundraising Goal for Individual
Capital Projects?
25%, 50%, 75%, or 100%?
What should be the Budget Recommendation for
City Funds?
25%, 50%, 75%, or 100%?
Thank You