RecordWell Data

Public Information Meeting — Minutes

Town of Linn · Walworth County · Public Information Meeting · meeting of Dec 8, 2025 · Minutes

Open the original document More from Town of Linn

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Minutes PUBLIC INFORMATION MEETING ZENDA ROAD CONSTRUCTION PROJECT December 08, 2025, 6:30 p.m. Linn Town Hall W37228 Franklin Walsh St. Zenda, WI 53195 In person and Remote Chairman Weiss called the Public Hearing to order at 6:35 p.m. Present were Supervisors Zimmerman (arrived at 6:45 pm), Livingston, Leith, Palmer, Chairman Weiss, Attorney Duquette, Administrator/Treasurer D. Zimmerman, Clerk Morris. Plan for Zenda Road Construction Project: Discussion Only: Chairman Weiss invited engineer Ryan Rudzinski of Batterman to come forward to explain the project. They are working on the Zenda Rd project design. The Town is redoing the portion from Linton Rd to County Hwy B, which is about 1.5 miles. They are going to pulverize the existing road and leave it there in place as a new base for the road. They will then lay new asphalt on top of that. The existing roadway is 22 feet wide. We are going to widen that to 24 feet of asphalt. The shoulders will be two-feet-wide on either side and made of gravel. They will be replacing driveway and roadway culverts and addressing any drainage concerns with the project. Project Timeline: Information meeting tonight. Then complete the Environmental process. When that is complete in January, we will then do the preliminary design of the project. This should be finished in March. They will then progress to the final design and complete the project in August 2026. Construction is scheduled for 2027. Public Comments: Delano Lucas ofN1210 Zenda Road has concerns about widening the road. He has trees that he put in 20 years ago and has been waiting all of this time for them to reach this height. He also put in a hedge to enclose his property and has concerns about all of this being taken out. He had a realtor come out to see what the value of his house is now verses if all of the trees were removed. The real tor said that it is very nice and secluded with the trees. If the trees are removed the realtor said it could lower his property by $80,000 to $100,000. He talked about the fact that the cost would be doubled if they widen each side of the road verses one side of the road. Where he lives is where most of the truck drivers start breaking. There is a lot of engine breaking going on. He wants them to make the road thick enough and maybe lower the speed limit so that the road will last longer. He also asked when the final plan would be done so that he could go out and measure the space himself. At the end of the meeting, he asked where he should go to seek legal help if he thinks he needs to. Ryan said that the engineers do not wish to get into private property. They will try their best not to do that.

Source: Town of Linn website. First collected Oct 8, 2026.