8.31.26 Joint Review Board — Agenda Packet
City of Fort Atkinson · Jefferson County · General · meeting of Aug 31, 2026 · Agenda packets
Open the original document More from City of Fort Atkinson
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
City of Fort Atkinson
City Manager's Office
101 N. Main Street
Fort Atkinson, WI 53538
JOINT REVIEW BOARD MEETING
IN PERSON AND VIA ZOOM
MONDAY, AUGUST 31, 2026 – 3:00 PM
MUNICIPAL BUILDING – SECOND FLOOR
https://us02web.zoom.us/launch/edl?muid=3686140a-e823-44ab-a732-496a74420f35
Meeting ID: 599 786 6403
Passcode: 53538
Dial by Location
+1 312 626 6799
If you have special needs or circumstances which may make communication or accessibility
difficult at the meeting, please call (920) 397-9901. Accommodations will, to the fullest extent
possible, be made available on request by a person with a disability.
AGENDA
1. Call meeting to order
2. Roll call
3. New Business
a. Review and possible action relating to the minutes of July 27, 2026, Joint Review
Board Meeting (Ebbert, Clerk/Treasurer/Finance Director)
b. Review and discussion of the proposed Project Plan and Boundary of Tax
Incremental District No. 12 (Houseman, City Manager)
c. Review and possible action relating to a Resolution adopting the Project Plan and
boundaries for Tax Incremental District (TID) No. 12, City of Fort Atkinson,
Jefferson County, Wisconsin (Houseman, City Manager)
d. Review and discussion of the proposed Project Plan and Boundary of Tax
Incremental District No. 13 (Houseman, City Manager)
e. Review and possible action on a Resolution adopting the project plan and
boundaries for Tax Incremental District (TID) No. 13, City of Fort Atkinson,
Jefferson County, Wisconsin (Houseman, City Manager)
4. Adjournment
Page 1 of 85
Date Posted: Augusg 28, 2026
CC: JRB Members: Chairperson and City Representative Rebecca Houseman; Jefferson County
Representative Michael Luckey; Fort Atkinson School District Representative Nathan Knitt;
Madison Area Technical College Representative Shawna Marquardt; Citizen Representative
Jonah Ralston; City Council; City Staff; City Attorney; News Media
The purpose of this meeting is to reconvene the Joint Review Board to review and discuss the
proposed Project Plan and Boundary for the City of Fort Atkinson TID No. 12 and the proposed
Project Plan and Boundary for the City of Fort Atkinson TID No. 13, pursuant to Section
66.1105 of the Wisconsin Statutes. A final decision may be made regarding TID No. 12 and 13,
resolutions may be made, and the municipality will be notified of its decision. The City of Fort
Atkinson has contracted with Robert W. Baird & Company to assist in the creations of the
project plans listed above. If you have any further questions about the duties of the Joint
Review Board or want to discuss these projects before the meeting, you may contact Rebecca
Houseman at (920) 397-9901.
It is possible that members of, and possibly a quorum of members of, other government bodies
of the municipality may be in attendance at this Joint Review Board Organizational Meeting to
gather information. No action will be taken by any governmental body at this meeting other
than the Joint Review Board.
Visit us online! City news and information can be found at www.fortatkinsonwi.gov, and be sure
to follow us on Facebook @FortAtkinsonWI.
Page 2 of 85
City of Fort Atkinson
City Manager's Office
101 N. Main Street
Fort Atkinson, WI 53538
JOINT REVIEW BOARD MEETING
IN PERSON AND VIA ZOOM
MONDAY, JULY 27, 2026 – 3:00 PM
MUNICIPAL BUILDING – SECOND FLOOR
MINUTES
1. Call meeting to order
Chairperson Manager Houseman called the meeting to order at 3:00 pm.
2. Roll call
Present: Joint Review Board Members: Chairperson and City Representative Rebecca
Houseman; Jefferson County Representative Michael Luckey; Fort Atkinson School District
Representative Nathan Knitt; Madison Area Technical College Representative Shawna
Marquardt and Citizen Representative Jonah Ralston. Also present: City
Clerk/Treasurer/Finance Director.
3. Discuss Role of the Joint Review Board
a. Department of Revenue Tax Incremental Financial Manual - Role of JRB
Chairperson Manager Houseman provided that the Joint Review Board consists of one
representative from each taxation jurisdiction (school district, technical college, county,
municipality), and one public member. The JRB must make a decision based on the
documents and information provided by the municipality and three criteria found in state
law (secs. 66.1105(4m)(c), 66.1106(3)(c), and 60.85(4)(c), Wis. Stats.). The JRB must
determine whether the:
1. Development expected in the TID would occur without the use of TIF ("but for"
requirement).
2. Economic benefits of the TID, as measured by increased employment, business and
personal income and property value, are sufficient to compensate for the cost of the
improvements.
3. Benefits of the proposal outweigh the anticipated tax increments to be paid by the
property owners in the overlying taxing jurisdictions.
4. 2025 TID Reports
a. Review and possible action relating to the 2025 TID No. 6 Report
TID NO. 6
TID No. 6 was created as an Industrial TID on January 18, 2000. 2018 was the last year to
Page 3 of 85
incur TIF-related costs. This TID has been designated as a “distressed TID” which allows the
City to extend its life by 10 years to recover the costs associated with the improvements to
the TID. This designation also allows the City’s other TIDs (No. 7 and No. 8) to donate
excess increment to this TID. In 2025, the TID recovered all funds, including some
unanticipated revenue. In the fall of 2025, the City Council adopted a resolution extending
the life of TID No. 6 for an additional year to support affordable housing. In 2026, the City
Council terminated the TID. The ending balance in TID No. 6 is almost $1.3M, which will be
distributed to the overlaying taxing jurisdictions per the audit, which will be completed in
late 2026.
b. Review and possible action relating to the 2025 TID No. 7 Report
TID NO. 7
TID No. 7 was created as a Blight Elimination TID on January 18, 2000. 2022 was the last
year to incur TIF-related costs. As such, no new projects, incentives, or financing may be
implemented. This TID was scheduled to close in 2027; however, because it has been
designated as a Donor to Distressed TID No. 6, its life can be extended to 2033, consistent
with a maximum legal life of the TID of 27 years plus 6 years as a Donor to Distressed. In
the fall of 2025, the City Council adopted a resolution extending the life of TID No. 7 for an
additional year to support affordable housing. In 2026, the City Council terminated the
TID. At the end of 2025, there was a positive balance of $282,134 in this TID. These funds
will be distributed to the overlaying taxing jurisdictions per the audit, which will be
completed in late 2026.
c. Review and possible action relating to the 2025 TID No. 9 Report
TID NO. 9
In late 2022, the Joint Review Board approved a new mixed-use TID (TID No. 9), which
overlayed TID No. 8, and included recently annexed land as well as undeveloped and
underdeveloped land. This TID was created to support the development of the City-owned
land along Banker Road, as well as additional major projects as described in the Project
Plan. The JRB approved the TID and Project Plan on November 1, 2022, and the TID was
established in 2023. The fund balance at the end of 2025 was -$1,565,631 which includes a
$1,625,000 loan from the General Fund and the Wastewater Utility to support the Ridge
View Estates public infrastructure. As shown in the attached pro forma from the City's
financial advisors, and in the 2025 audit document, the City has a plan and a debt schedule
to repay the interfund loan with increment over the life of the TID. Staff is not concerned
about the negative fund balance reported in this TID.
d. Review and possible action relating to the 2025 TID No. 10 Report
TID NO. 10
TID No. 10 was created as a Blight Elimination TID in November 2022, with values
established on January 1, 2023. TID No. 10 in Fort Atkinson is projected to run until 2050,
with the final tax collection slated for 2051. The expenditure period will end in 2043. The
fund balance at the end of 2025 was $4,322. Staff anticipates additional projects in TID No.
10, including a proposed multifamily residential project known as River Point Commons, in
the coming months and years.
Page 4 of 85
Ralston moved, seconded by Marquardt to approve the 2025 Annual Reports for TID 6, TID
7, TID 9 and TID 10. Motion carried.
5. Unfinished Business
a. Review and possible action relating to the Minutes of the June 22, 2026 Joint Review Board
meeting
Marquardt moved, seconded by Knitt to approve the minutes of the June 22, 2026 Joint
Review Board meeting. Motion carried.
b. Review and discussion of the proposed Project Plan and Boundary of Tax Incremental
District No. 11
Chairperson Houseman discussed that the Tax Increment District (“TID”) is being created
as a “Mixed-Use District” based on the identification and classification of the property
proposed to be included in the TID. The maximum life (absent extension) of the TID is 20
years from the date of adoption. TID #11 encompasses approximately 249 acres, of which
about 87 acres (35%) are relevant to newly platted calculation. The City confirms less than
35% percent of the district is land proposed for newly platted residential development as
none of the development is expected to be newly platted.
c. Review and possible action relating to the Joint Review Board Resolution creating TID No.
11
Knitt moved, seconded by Marquardt to approve the Joint Review Board Resolution
approving the Creation of the Tax Incremental District No 11, City of Fort Atkinson,
Jefferson County Wisconsin. Motion carried.
d. Review and discussion of the proposed Project Plan and Territory Addition Amendment #1
for Tax Incremental District No. 9
Chairperson Manager Houseman reviewed the amendment that included lots existing in
Koshkonong Estates.
e. Review and possible action relating to the Joint Review Board Resolution amending TID No.
9
Ralston moved, seconded by Marquardt to approve the Joint Review Board Resolution
approving the Territory Addition Amendment No. 1 of Tax incremental District No 9, City
of Fort Atkinson, Jefferson County, Wisconsin. Motion carried.
6. New Business
a. Appointment of Chairperson for TID No. 12 and TID No. 13
Ralston moved, seconded by Marquardt to appoint Manager Houseman to serve as
Chairperson for TID 12 and TID 13. Houseman accepted. Motion carried.
b. Appointment of Public Member for TID No. 12 and TID No. 13
Houseman moved, seconded by Marquardt to appoint Jonah Ralston to serve as the Public
Page 5 of 85
Member for TID 12 and TID 13. Ralston accepted. Motion carried.
c. Overview of purpose and description of the Tax Incremental District No. 12 being created
Chairperson Houseman provided that Tax Increment District (“TID”) is being created as a
“Blight District” based on the identification and classification of the property proposed to
be included in the TID. Not less than 50% by area of the real property within the District is
a blighted area as defined by Wis. Stat. § 66.1105(2)(ae)1. A blighted area is property that
may consist or but is not limited to structural deterioration, health and safety hazards,
environmental issues, or economic stagnation. The maximum life (absent extension) of the
TID is 27 years from the date of adoption. Future projects include but not limited to:
sanitary sewer, pedestrian and bicycle safety improvements, boat launch, parking lot, park
and trail improvements, land purchases and stormwater improvements.
d. Overview of purpose and description of the Tax Incremental District No. 13 being created
Chairperson Houseman provided that Tax Increment District (“TID”) is being created as a
“Blight District” based on the identification and classification of the property proposed to
be included in the TID. Not less than 50% by area of the real property within the District is
a blighted area as defined by Wis. Stat. § 66.1105(2)(ae)1. A blighted area is property that
may consist of but is not limited to structural deterioration, health and safety hazards,
environmental issues, or economic stagnation. The maximum life (absent extension) of the
TID is 27 years from the date of adoption. Market square improvements, Whitewater and
Main Street intersection, S. Main Street, S 3rd Street, parking lot, park, trial, utility and
road improvements, land purchases and stormwater improvements.
e. Set the next meeting date for formal review and action on TID No. 12 and TID No. 13
(August 31, 2026)
Marquardt moved, seconded by Knitt to set the meeting date for formal review and action
on TID 12 and TID 13 for August 31, 2026 for 3:00 pm. Motion carried.
7. Adjournment
Knitt moved, seconded by Marquardt to adjourn. Meeting adjourned at 3:40 pm.
Respectfully submitted,
Michelle Ebbert
City Clerk/Treasurer/Finance Director
Page 6 of 85
City of Fort Atkinson
City Manager's Office
101 N. Main Street
Fort Atkinson, WI 53538
MEMORANDUM
DATE: August 31, 2026
TO: Fort Atkinson City Council
FROM: Rebecca Houseman, City Manager
RE: Review and possible action relating to a Resolution adopting the Project Plan
and boundaries for Tax Incremental District (TID) No. 12, City of Fort Atkinson,
Jefferson County, Wisconsin (Houseman, City Manager)
BACKGROUND
The City is proposing to create a new Tax Incremental District (TID) No. 12, generally located in
the area around Main Street and then primarily along Madison Avenue, West Sherman Avenue,
and Riverside Drive, located within the City's limits. The project plan, maps, and notices are
included with this memo for review by the City Council and the Public. TID 12 will be classified
as a blighted district based on the identification and classification of the property proposed to
be included within the district.
The Plan Commission held a public hearing relating to TID No. 12 at the meeting on July 28,
2026, and adopted a Resolution recommending the City Council approve the TID. The City
Council reviewed this item at the meeting on August 18, 2026, and adopted the attached
approval Resolution.
DISCUSSION
There are 109 parcels proposed to be included in TID No. 12, for a total of about 32 acres of
land. The estimated fair market value of the land and improvements in the TID is $41,344,000.
If this TID is created, the taxes based on that land value will continue to be distributed to the
four taxing jurisdictions. If created, the taxes on the additional value in the TID over its life will
go into a separate fund for use in supporting development and installing infrastructure and
improvements within the TID. Proposed public project improvements may include, but are not
limited to, sanitary sewer and water system improvements, pedestrian and bicycle safety
improvements, the Mechanic Street boat launch improvements, public parking lot
reconstruction, utility and road improvements, entryway signage, pedestrian and bicycle path
extensions, administrative costs, financing costs, and others as outlined in the Project Plan.
A public notice for this public hearing was mailed to each taxing jurisdiction on July 7, 2026. In
addition, it was published in the Jefferson County Daily Union as a Class 2 Notice on July 14,
2026, and July 21, 2026. The Joint Review Board held its initial meeting to review this matter on
Page 7 of 85
July 27, 2026. The Plan Commission held a public hearing on July 28th and adopted a resolution
recommending the City Council approve the TID Project Plan. The City Council reviewed this
matter on August 18th and adopted an approval Resolution.
FINANCIAL ANALYSIS
Approval of the TID will provide financing for projects within the TID and is expected to increase
the overall tax base of the City.
RECOMMENDATION
Staff recommends the Joint Review Board adopt a Resolution approving the Project Plan and
Boundaries for Tax Incremental District No. 12, City of Fort Atkinson, Jefferson County,
Wisconsin.
ATTACHMENTS
1. Combined-Public-Notices-Fort Atkinson TID 12 Creation blight
2. 7.7.26 Taxing Entities Public Hearing Notice TID 12 creation
3. Res 1465 TID 12 Creation - Plan Comm
4. TID#12 creation DRAFT 5 project plan Fort Atkinson 081026
5. Res 1467 TID 12 Creation - City Council
Page 8 of 85
NOTICE OF PUBLIC HEARING AND JOINT REVIEW BOARD MEETING
REGARDING THE PROPOSED PROJECT PLAN
FOR TAX INCREMENTAL DISTRICT (TID) NUMBER 12
IN THE CITY OF FORT ATKINSON, WISCONSIN
NOTICE IS HEREBY GIVEN, that the City of Fort Atkinson will hold an organizational Joint Review
Board (JRB) meeting on July 27, 2026, at 3 p.m. in the Municipal Building Council Chambers, located
at 101 N. Main Street, Fort Atkinson, WI 53538. The purpose of this meeting is to organize a JRB to
consider the proposed project plan for TID 12. The meeting is open to the public.
NOTICE IS HEREBY GIVEN, that the Plan Commission, of the City of Fort Atkinson, will hold a public
hearing on July 28, 2026, at 4 p.m., in the Municipal Building Council Chambers, 101 N. Main Street,
Fort Atkinson, WI regarding the proposed project plan for TID 12 in the City.
Access meeting online:
https://us02web.zoom.us/j/82214860406?pwd=TEVyUVdQM05VNFVzb0E2TUNTVnZlZz09; Meeting
ID: 822 1486 0406; Passcode: 53538; Dial by Location +1 312 626 6799. Contact Sarah Weihert at
920-397-9901 to request accommodation or access assistance.
City of Fort Atkinson TID 12 is generally located in the area in the City around Main Street and then
primarily along Madison Avenue, West Sherman Avenue, and Riverside Drive located within the City's
limits.
TID 12 will be classified as a blighted district based on the identification and classification of the
property proposed to be included within the district.
Proposed public project improvements may include but are not limited to sanitary sewer and water
system improvements, road curb and gutter, intersection, and storm water infrastructure
improvements, street improvements, lighting, sidewalks, multi-use trail and park improvements,
entryway signage, pedestrian and bicycle path extensions, professional and organizational services,
administrative costs, and finance costs.
As part of the project plan, cash grants may be made by the City of Fort Atkinson to owners, lessees,
or developers of property within TID 12.
The proposed costs include projects within the proposed boundary and within a one-half mile radius of
the boundary of the district.
At the public hearing, all persons will be afforded a reasonable opportunity to be heard concerning the
proposed project plan. A copy of the TID 12 project plan and boundary is available for inspection and
will be provided upon request. Arrangements for either inspection or receipt of a copy of the project
plan may be made by contacting the City Manager, Municipal Building, 101 N. Main Street, Fort
Atkinson, WI 53538; Phone (920) 397-9901.
Dated the 6th day of July 2026
Rebecca Houseman
City Manager
Publication Date: July 14, 2026 and July 21, 2026.
Page 9 of 85
VIA EMAIL-RETURN RECEIPT REQUESTED
July 7, 2026
Michael Luckey, County Administrator, Jefferson County
Shawna Marquardt, Dean of Regional Campuses, Madison Area Technical College
Nathan Knitt, Director of Business Services, School District of Fort Atkinson
Rebecca Houseman, City Manager, City of Fort Atkinson
Jonah Ralston, City of Fort Atkinson resident, Public Member (nominated)
RE: Notice of Public Hearing and Joint Review Board dates-Regarding Proposed Project Plan & District
Boundary for Tax Incremental District No. 12 of the City of Fort Atkinson, Wisconsin
Dear Joint Review Board Member,
The City of Fort Atkinson is proposing the creation of Tax Increment al District No. 12 in the City. Pursuant to
Section 66.1105 of Wisconsin Statues, we need to hold our first meeting of the Joint Review Board within 14
days from the first public notice publication on July 14, 2026, and before the public hearing scheduled for July
28, 2026.
This letter is to inform you that a public hearing will be held on Tuesday, July 28, 2026, at 4 p.m. in the Fort
Atkinson Municipal Building Council Chambers, 101 N. Main Street, regarding the Proposed Project Plan and
District Boundary for Tax Incremental District No. 12 of the City of Fort Atkinson, Wisconsin.
The Wisconsin Tax Incremental Law provides that a Joint Review Board must be established with respect to the
proposed project plan and must include members chosen by Jefferson County, Madison Area Technical College,
School District of Fort Atkinson, City of Fort Atkinson and one public member chosen by a majority of the other
Joint Review Board members.
The first meeting of the Joint Review Board will be held on Monday, July 27, 2026, at 3 p.m. in the Fort
Atkinson Council Chambers, 101 N. Main Street. The purpose of the meeting will be to review the role of
the Joint Review Board, elect a chairperson and a public member, and discuss the district’s creation.
Enclosed is a copy of the agenda for that meeting and a copy of the notice of public hearing for the
Proposed Project Plan and District Boundary of Tax Incremental District No. 12.
The second Joint Review Board meeting has been scheduled for Monday, August 31, 2026 at 3 p.m.
Thank you for your cooperation in this important matter. If you have any questions or require further information,
please contact me at 920-397-9901 or rhouseman@fortatkinsonwi.gov.
Sincerely,
Rebecca Houseman
City Manager
Page 10 of 85
Page 11 of 85
Page 12 of 85
City of Fort Atkinson
TID #12 Project Plan & District Boundary
1
Project Plan & District Boundary
Tax Incremental District No. 12
in the
CITY OF FORT ATKINSON, WISCONSIN
August 18, 2026
(Approved Actions)
Organizational Joint Review Board Meeting Held July 27, 2026
Public Hearing Held July 28, 2026
Adopted by Planning Commission July 28, 2026
Adopted by City Council August 18, 2026
Adopted by Joint Review Board August 31, 2026
Prepared in part by:
Robert W. Baird & Co.
Public Finance
777 E. Wisconsin Ave.
Milwaukee, WI 53202
800.792.2473
Page 13 of 85
City of Fort Atkinson
TID #12 Project Plan & District Boundary
2
Table of Contents
Section 1: City of Fort Atkinson Officials ............................................................................... 3
Section 2: Introduction and Description of District ............................................................... 4
Section 3: Summary of Findings ............................................................................................ 5
Section 4: Map of Proposed District Boundary ...................................................................... 8
Section 5: One Half Mile Radius Map of Proposed District Boundary ..................................... 9
Section 6: Map Showing Existing Uses and Conditions ........................................................ 10
Section 7: Preliminary Parcels List and Analysis ................................................................. 11
Section 8: Equalized Valuation Test .................................................................................... 13
Section 9: Statement of Kind, Number and Location of Proposed Projects .......................... 13
Section 10: Maps Showing Proposed Improvements and Uses ............................................ 14
Section 11: Detailed List of Project Costs ............................................................................ 17
Section 12: Economic Feasibility ......................................................................................... 17
Section 13: Method of Financing and Timing of When Costs are to be Incurred. ................. 18
Section 14: Annexed Property ............................................................................................. 21
Section 15: Proposed Changes in Zoning Ordinances .......................................................... 21
Section 16: Proposed Changes in Master Plan, Map, Building Codes, and City Ordinances .. 21
Section 17: Relocation ........................................................................................................ 21
Section 18: Orderly Development of the City ...................................................................... 21
Section 19: A List of Estimated Non-Project Costs .............................................................. 22
Section 20: City Attorney Opinion ....................................................................................... 22
Section 21: Exhibit A Cash Flow Proforma Analysis ............................................................. 23
Section 22: Estimated Tax Increments By Taxing Entity ..................................................... 24
Section 23: Exhibit B City Attorney Opinion ........................................................................ 25
Section 24: Exhibit C TID #12 Boundary Legal Description ................................................. 27
Section 25: Disclaimer Text ................................................................................................ 31
Page 14 of 85
City of Fort Atkinson
TID #12 Project Plan & District Boundary
3
Section 1: City of Fort Atkinson Officials
City Council
Kyle Jaeckel President
Davin Lescohier President Pro Tem
Bruce Johnson Council Member
Peggy Huckabee Council Member
Jena Price Council Member
City Staff
Rebecca Houseman City Manager
Michelle Ebbert City Clerk/Treasurer/Finance Director
Zach Navin Director of Public Works
David Westrick City Attorney
Jedidiah Draeger Director of Neighborhood & Building Services
Sarah Weihert Public Relations/Executive Assistant
Planning Commission
Rebecca Houseman, Chairperson Diana Shull
Peggy Huckabee, Council Representative Vacant Citizen Position
John Ciccarelli Zach Navin, Secretary
Eric Schultz
Joint Review Board
Rebecca Houseman City Representative - Chairperson
Michael Luckey Jefferson County
Shawna Marquardt Madison Area Technical College
Nathan Knitt Fort Atkinson School District
Jonah Ralston Public Member
Page 15 of 85
City of Fort Atkinson
TID #12 Project Plan & District Boundary
4
Section 2: Introduction and Description of District
The City plans to use Tax Incremental Financing (“TIF”) as a successful
economic development programming tool by providing public improvements
and development incentives to encourage and promote residential and
commercial development. The goal is to increase the t ax base, to create and
enhance economic opportunities, and to increase housing options within the
City. The City works with developers and property owners to provide
infrastructure improvements and incentives for development. Public
infrastructure and property improvements will be financed by a combination
of TIF increments and debt financing.
The Tax Increment District (“TID”) is being created as a “Blight District” based
on the identification and classification of the property proposed to be included
in the TID. Not less than 50% by area of the real property within the District
is a blighted area as defined by Wis. Stat. § 66.1105(2)(ae)1. A blighted area
is property that may consist or but is not limited to structural deterioration,
health and safety hazards, environmental issues, or economic stagnation. The
maximum life (absent extension) of the TID is 27 years from the date of
adoption.
Tax incremental financing is being proposed to encourage and support
development within the District. Said financing is intended to be used for the
projects outlined in this Project Plan (“Plan”). The District is located wholly
within the City of Fort Atkinson. Any proposed and potential new development
will generate additional property taxes (tax increment) that will be used to
offset the cost of the public investments resulting from, or needed by, the new
development. Planned or potential development projects are detailed in the
Statement of Kind, Number and Location of Proposed Projects section of this
Plan.
The City anticipates various public improvement project cost expenditures of
approximately $12,550,000 including financing/interest costs during the TID’s
22-year expenditure period. Proposed public project improvements may
include but not limited to developer incentives in the form of cash grants or
TID loans, infrastructure improvements, professional and organizational
services, administrative costs, and finance costs.
As a result of the creation of this TID, the City projects a preliminary and
conservative cash flow analysis indicating approximately $20,381,000 in
increments. The TID increment will primarily be used to pay the debt service
costs of the TID, project costs within the TID, and project development
incentives. The increment may be used for bicycle/pedestrian connections ,
street/sidewalk improvements, riverwalk and streetscape improvements, and
Page 16 of 85
City of Fort Atkinson
TID #12 Project Plan & District Boundary
5
other infrastructure improvements within the vicinity of the district. The City
projects land and improvement values (incremental value) of approximately
$27,500,000 will be created in the TID by the end of 20 53. This additional
value will be a result of the improvements made, and projects undertaken
within the TID. If the project generates less in value than anticipated, any
shortfall in paying of the loan incentive is borne by the developer.
Maps depicting the boundaries and existing uses and conditions of the TID are
found in the respective mapping sections of this Plan.
Section 3: Summary of Findings
As required by Wis. Stats. § 66.1105, and as documented in this Project Plan
and the exhibits contained and referenced herein, the following findings are
made:
1. That the area described herein on the boundary map (page 6) is a
blighted area as defined in Section 66.1105(2)(ae), Wisconsin
Statutes, that the property substantially impairs or arrests the sound
growth of the city and is in need of redevelopment and that “but for”
the creation of this TID, the development projected as detailed in this
Project Plan: 1) would not occur; or 2) would not occur in the manner,
at the values, or within the timeframe desired by the City. In making
this determination, the City has considered the following information:
• Development within the TID has not occurred at the pace anticipated
by the City. Infrastructure and other development related expenses
are not likely to be borne exclusively by private developers;
therefore, the City has concluded that public investment wi ll be
required to fully achieve the City’s objectives for this area.
• To achieve its objectives, the City has determined that it must take
an active role in encouraging development by making appropriate
public expenditures in the area. Witho ut the availability of tax
increment financing, these expenditures are unlikely to be made.
Enhancement of this area will complement existing venues in the
City, and benefit, not only the City, but all overlapping taxing
jurisdictions. Accordingly, the costs to implement the needed
projects and programs are appropriately funded through tax
increment financing.
• In order to make the area included within the TID suitable for
development, the City will need to make a substantial investment to
Page 17 of 85
City of Fort Atkinson
TID #12 Project Plan & District Boundary
6
pay costs of some or all of the projects listed in the project plan and
to maintain a rent structure that does not exceed the upper end of
market levels. Due to the public investment that is required, the City
has determined that development of the area wi ll not occur at the
pace or levels desired solely as a result of private investment.
2. The economic benefits of the Tax Incremental District, as measured by
increased property values, are sufficient to compensate for the cost of
the improvements. In making this determination, the City has
considered the following information:
As demonstrated in the Economic Feasibility Section of this Project
Plan, the tax increments projected to be collected and the debt issuance
will be more than sufficient to pay for the proposed project costs. On
this basis alone, the finding is supported.
3. The benefits of the proposal outweigh the anticipated tax increments
to be paid by the owners of property in the overlying taxing
jurisdictions.
Since the development expected to occur is unlikely to take place
without the use of Tax Incremental Financing (see Finding #1) and since
the TID will generate economic benefits that are more than sufficient to
compensate for the cost of the improvements (see Finding #2), the City
reasonably concludes that the overall benefits of the TID outweigh the
anticipated tax increments to be paid by the owners of property in the
overlying taxing jurisdictions. It is further concluded that since the “but
for” test is satisfied, there would, in fact, be no foregone tax increments
to be paid in the event the TID is not created.
4. The improvements to be made within the TID are likely to significantly
enhance the value of substantially all other real property in the City
surrounding the TID.
5. The equalized value of taxable property of the TID does not exceed
12% of the total equalized value of taxable property within the City.
6. The Project Plan for the TID is feasible and is in conformity with the
master plan of the City.
7. The City estimates that less than 35% of the territory within the District
will be devoted to retail business at the end of the District’s maximum
expenditure period, pursuant to Wisconsin Statutes Sections
66.1105(5)(b).
Page 18 of 85
City of Fort Atkinson
TID #12 Project Plan & District Boundary
7
8. The TID is being created by the city as a blight district. As described in
Finding #1 above, 50% or more of the proposed district’s area is a
blighted area.
Page 19 of 85
City of Fort Atkinson
TID #12 Project Plan & District Boundary
8
Section 4: Map of Proposed District Boundary
Current Map is reflective of the 01/01/2026 parcel list.
Page 20 of 85
City of Fort Atkinson
TID #12 Project Plan & District Boundary
9
Section 5: One Half Mile Radius Map of Proposed District Boundary
Page 21 of 85
City of Fort Atkinson
TID #12 Project Plan & District Boundary
10
Section 6: Map Showing Existing Uses and Conditions
Page 22 of 85
City of Fort Atkinson
TID #12 Project Plan & District Boundary
11
Section 7: Preliminary Parcels List and Analysis
As of 01/01/2026 parcel list.
Page 23 of 85
City of Fort Atkinson
TID #12 Project Plan & District Boundary
12
Page 24 of 85
City of Fort Atkinson
TID #12 Project Plan & District Boundary
13
Section 8: Equalized Valuation Test
The following calculations demonstrate that the City is in compliance with
s.66.1105(4)(gm)4.c. Wis. Stats., which requires that the equalized value of
the taxable property in the proposed TID, plus the value increment of any
existing Tax Incremental Districts, does not exceed 12% of the total equalized
value of taxable property within the City. With TID #12, the value increment
of all existing Tax Increment Districts will be approximately 7.05%.
Valuation Test Compliance Calculation
2025 Projected Equalized Valuation (TID IN) $ 1,555,582,500
Limit for 12% Test $ 186,669,900
Increment Value of Existing TIDs $ 42,303,600
Projected Base Value of New TIDs 9 and 11 previously approved $ 26,058,600
Projected Base Value of New TID $ 41,344,000
Total Value Subject to Test $ 109,706,200
Compliance ($109,706,200 < $186,669,900) Meets Requirement
Section 9: Statement of Kind, Number and Location of
Proposed Projects
The City expects to implement the followi ng public project improvements .
Any costs including eligible administrative costs necessary or convenient to
the creation of the district or directly or indirectly related to the public works
and other projects are considered "project costs" and eligible to be paid with
tax increment revenues of the TID.
Page 25 of 85
City of Fort Atkinson
TID #12 Project Plan & District Boundary
14
Project Descriptions
1. Sanitary Sewer Project – Sanitary Sewer repair project in the 100
block of N. Main St.
2. Pedestrian and Bicycle Safety Improvements – Install pavement
markings across Main Street at intersections per MUTCD standards,
install standard pavement marking (6-inch wide) crosswalk strips
on the side streets, consider epoxy paint (or an option for City to
easily maintain), install bicycle safety routes and incorporate bicycle
travel lane signage, incorporate bicycle travel lane signage per
MUTCD standards, explore opportunities to connect lanes and
routes to connect southeastern portion of the community to
downtown.
3. Mechanic Street Boat Launch – Improve downtown boat launch
area.
4. Public Parking lot reconstruction – Improve and reconstruct
downtown parking lots.
5. Park/Trail Improvements – Rock River Riverwalk reconstruction,
extension and/or improvements, or other improvements identified
in the City’s Comprehensive Plan (2022), Comprehensive Outdoor
Page 26 of 85
City of Fort Atkinson
TID #12 Project Plan & District Boundary
15
Recreation Plan (2023), or through a planned development. This
may include a connection to the Glacial River Bike Trail system.
6. Utility and Road Improvements – within ½ mile of the TID
boundaries necessary to support the proper and responsible
development of the TID.
7. Entryway and Wayfinding Signage Improvements – prepare for
possible new entryway signage and/or wayfinding signage at Main
Street entrance points and throughout the project area.
8. Streetscape Enhancements and Green Infrastructure Improvements
– Improve downtown aesthetics by diversifying street trees, adding
uniform street lighting, adding uniform planters containing dwarf
shrubs or small flowering annuals. Adding trash cans, bicycle racks
and benches in a uniform color and design, etc., per the 2025
Council-adopted Main Street Corridor Plan.
9. Regional Stormwater Improvements – regional stormwater
improvements may include public or private stormwater detention
and retention within the TID and within ½ mile of the TID
boundaries.
10. Pedestrian/Bicycle Path Extensions and Improvements – Glacial
River Bike trail pedestrian and bicycle path future extensions and
connections may be considered within the TID and within ½ mile of
the TID.
11. City Land Purchases – the City may purchase land throughout the
life of the TID for public infrastructure, parkland, and/or if an
opportunity arises where the purchase of land would benefit the
City and the TID.
12. Direct Developer Assistance – Direct developer assistance and
incentives may be utilized through TIF in order to take advantage
possible development opportunities for the redevelopment of
blighted properties.
13. Financing and Interest – the cost of issuance and interest on
borrowing needed for projects along with interest due to
development for any developer incentive loan in the redevelopment
of blighted properties.
14. Administrative & Organizational Fees – City staff and consultants
planning, engineering, legal, and administrative fees, along with
organizational fees, Department of Revenue annual fees, and the
costs associated with the creation of this TID.
Page 27 of 85
City of Fort Atkinson
TID #12 Project Plan & District Boundary
16
Section 10: Maps Showing Proposed Improvements and Uses
Page 28 of 85
City of Fort Atkinson
TID #12 Project Plan & District Boundary
17
Section 11: Detailed List of Project Costs
1. INFRASTRUCTURE IMPROVEMENTS $5,900,000
2. DEVELOPER ASSISTANCE $1,500,000
4. LAND PURCHASES $750,000
4. FINANCING & INTEREST $4,000,000
5. ADMINISTRATIVE & ORGANIZATION FEES $400,000
ESTIMATED TOTAL $12,550,000
The project cost is based on current prices and preliminary estimates. The City
reserves the right to increase this cost to reflect inflationary increases and
other uncontrollable circumstances between the creation of the TID and the
time of construction. The tax increment allocation is preliminary and is subject
to adjustment based upon the implementation of the Plan.
This Plan is not meant to be a budget nor an appropriation of funds for specific
projects, but a framework within which to manage projects. All costs included
in the Plan are estimates based on the best information available. The City
retains the right to delete or pursue future projects listed in the prior
paragraph, and shown on the map, or change the scope and/or timing of
projects implemented as they are individually authorized by the City Council,
without amending the Plan.
The City has provided a full list of projects that would only be included in the
TID in the event sufficient increment growth is expected to be generated. The
City reserves the right to replace specific projects within the general
categories stated in Section 9 to better meet the needs of the development as
it progresses.
The Plan authorizes the expenditure of funds for project costs within a ½ mile
radius of the TID boundary.
Section 12: Economic Feasibility
The information and exhibits contained within this project plan demonstrate
that the proposed TID is economically feasible in so far as:
Page 29 of 85
City of Fort Atkinson
TID #12 Project Plan & District Boundary
18
• The City has available to it the means to secure the necessary financing
required to accomplish the projects contained within this Plan. A listing of
“Method of Financing and Timing of When Costs are to be Incurred” follows.
• The development anticipated to occur because of the implementation of
this Plan will generate sufficient tax increments to pay for the cost of the
projects. This Plan identifies the following: 1) the development expected
to occur, 2) a projection of tax increments to be collected resulting from
that development and other economic growth within the TID, and 3) a
cash flow model demonstrating that the projected tax increment
collections and all other revenues available such as debt issuance will be
sufficient to pay all Project Costs.
To evaluate the economic feasibility of TID #12 it is necessary to project the
amount of tax revenue that can be reasonably generated over the legal life
of the TID. Included in Exhibit A is a proforma analysis of TID # 12. The
proforma analyzes expenses based on project plan costs of TID #12 against
projected TID revenue. Tax revenue is conservatively estimated. Cash
received from future TID # 12 tax increments will be used to fund project
costs and i mplementation of this Plan. In 2054, the final year of revenue
collection for the TID, it is projected to have repaid all expenditures and is
left with a positive surplus balance.
Section 13: Method of Financing and Timing of When Costs
are to be Incurred.
The City plans to fund project costs with cash received from future TID # 12
tax increments and to issue a developer grant/loan to provide direct or indirect
financing for the projects to be undertaken. The following is a list of the types
of obligations the City may choose to utilize.
General Obligation (G.O.) Bonds or Notes (BAN, NAN, TAN)
The City may issue G.O. Bonds or Notes to finance the cost of Projects
included within this Plan. Wisconsin Statutes limit the principal amount of
G.O. and State Trust Fund Loan debt that a community may have outstanding
at any point in time to an amount not greater than five percent of its total
equalized value (including increment values).
Community Development Authority Lease Revenue Bonds:
Pursuant to Section 66.1335 Wisconsin Statutes (i.e., the “Community
Development Authority Law”) the City may issue Community Development
Authority Lease Revenue Bonds to finance projects included within this Plan.
Page 30 of 85
City of Fort Atkinson
TID #12 Project Plan & District Boundary
19
Lease Revenue Bonds are not general obligations of the City and therefore
do not count against the City’s borrowing capacity. To the extent tax
increments collected are insufficient to meet the annual debt service
requirements of the revenue bonds, the City may be subject to either a
permissive or mandatory requirement to appropriate on an annual basis a
sum equal to the actual or projected shortfall.
Tax Increment Revenue Bonds
The City has the authority to issue revenue bonds secured by the tax
increments to be collected. These bonds may be issued directly by the City
or as a Lease Revenue Bond by a Community Development Authority (CDA).
Tax Increment Revenue Bonds and Lease Revenue Bonds are not general
obligations of the City and therefore do not count against the cities.
borrowing capacity. To the extent tax increments collected are insufficient to
meet the annual debt service requirements of the revenue bonds, the City
may be subject to either a permissive or mandatory requirement to
appropriate on an annual basis a sum equal to the actual or projected
shortfall.
Utility Revenue Bonds
The City can issue revenue bonds to be repaid from revenues of the sewer
and/or water systems, including revenues paid by the City that represent
service of the system to the City. There is neither a statutory nor
constitutional limitation on the amount of revenue bonds that can be issued,
however, water rates are controlled by the Wisconsin Public Service
Commission and the City must demonstrate to bond underwriters its ability
to repay revenue debt with the assigned rates. To the extent the City utilizes
utility revenues other than tax increments to repay a portion of the bonds,
the City must reduce the total eligible Project Costs in an equal amount.
Board of Commissioners of Public Lands State Trust Fund Loans
The City may issue State Trust Fund Loans to finance the cost of Projects
included within this Plan. Wisconsin Statutes limit the principal amount of
State Trust Fund Loan and GO debt that a community may have outstanding
at any point in time to an amount not greater than five percent of its total
equalized value (including increment values).
Bonds Issued to Developers (“Pay as You Go” Financing)
The City may issue a bond to one or more developers who provide financing
for projects included in this Plan. Repayment of the amounts due to the
developer under the bonds are limited to an agreed percentage of the
available annual tax increments collected that result from the improvements
made by the developer. To the extent the tax increments collected are
insufficient to make annual payments, or to repay the entire obligation over
Page 31 of 85
City of Fort Atkinson
TID #12 Project Plan & District Boundary
20
the life of the District, the City’s obligation is limited to not more than the
agreed percentage of the actual increments collected . Bonds issued to
developers in this fashion are not general obligations of the City and therefore
do not count against the City’s borrowing capacity.
Federal/State Loan and Grant Programs
The State and Federal g overnments often sponsor grant and loan programs
that municipalities may potentially use to supplement TID expenditures or
provide financing for capital costs which positively impact the district. These
programs include Wisconsin Community Development Block Grants, Rural
Development Administration Community Facility Loan/Grants, Transportation
Economic Assistance Grants, and Economic Development Administration
Grants. These programs require local match funding to e nsure State and
Federal participation in the project.
The actual amount of debt issuance will be determined by the City at its
convenience and as dictated by the nature of the projects as they are
implemented.
Plan Implementation
Projects identified will provide the necessary anticipated governmental
services to the area, and appropriate inducements to encourage development
of the area. The City anticipates making total project expenditures of
approximately $12,550,000 plus financing/interest costs to undertake the
projects listed in this Project Plan. The Expenditure Period of this District is 27
years from the date of adoption of the Creation Resolution by the Common
Council. The projects to be undertaken pursuant to this Project Plan are
expected to be financed primarily with tax increments. The City reserves the
right to alter the implementation of this Plan to accomplish this objective.
Interest rates projected are based on current market conditions. Municipal
interest rates are subject to constantly changing market conditions. In
addition, other factors such as the loss of tax-exempt status of municipal
bonds or broadening the purpose of future tax -exempt bonds would affect
market conditions. Actual interest expense will be determined once the
methods of financing have been approved and securities or other obligations
are issued.
If financing as outlined in this Plan proves unworkable, the City
reserves the right to use alternate financing solutions for the projects
as they are implemented.
Page 32 of 85
City of Fort Atkinson
TID #12 Project Plan & District Boundary
21
Section 14: Annexed Property
All lands within the TID proposed for inclusion in this amendment were either
within the City limits as of January 1, 2004, or, if annexed after that date,
have been within the City for a minimum of three years.
Section 15: Proposed Changes in Zoning Ordinances
Any changes in zoning that may take place throughout the life of the TID will
be consistent with the City’s Comprehensive Plan – Future Land Use Map.
Section 16: Proposed Changes in Master Plan, Map,
Building Codes, and City Ordinances
The City does anticipate that the TID will require changes in the master plan,
map, building codes, and City ordinances to implement this project plan. The
proposed development and uses are consistent with the a dopted Fort
Atkinson Comprehensive Plan.
Section 17: Relocation
The City does not anticipate the need to relocate persons or businesses in
conjunction with this Plan. In the event relocation or the acquisition of
property by eminent domain becomes necessary at some time during the
implementation period, the City will follow applicable state statues as
required in Wisconsin Statutes Chapter 32.
Section 18: Orderly Development of the City
The creation of the TID will enable the City to undertake projects in
furtherance of the stated objectives of its Comprehensive Plan and other
planning documents. To this extent, the creation of the TID promotes the
orderly development of the City.
Page 33 of 85
City of Fort Atkinson
TID #12 Project Plan & District Boundary
22
Section 19: A List of Estimated Non-Project Costs
Non-Project costs are public works projects that only partly benefit the TID
or are not eligible to be paid with tax increment, or costs not eligible to be
paid with Tax Incremental Financing funds. The City does not anticipate any
non-project costs for the TID.
Section 20: City Attorney Opinion
Exhibit B contains a signed opinion from the City attorney advising whether
the project plan is complete and complies with Section 66.1105(4)(f) of the
Wisconsin Statutes.
Page 34 of 85
City of Fort Atkinson
TID #12 Project Plan & District Boundary
23
Section 21: Exhibit A Cash Flow Proforma Analysis
Page 35 of 85
City of Fort Atkinson
TID #12 Project Plan & District Boundary
24
Section 22: Estimated Tax Increments By Taxing Entity
Page 36 of 85
City of Fort Atkinson
TID #12 Project Plan & District Boundary
25
Section 23: Exhibit B City Attorney Opinion
Page 37 of 85
City of Fort Atkinson
TID #12 Project Plan & District Boundary
26
Page 38 of 85
City of Fort Atkinson
TID #12 Project Plan & District Boundary
27
Section 24: Exhibit C TID #12 Boundary Legal Description
LEGAL DESCRIPTION – TID #12
LOT 1, BLK 1, MRS. BARRIES ADD. EX N34FT., BEG ON W/L OF N. MAIN ST
191 FT N OF MADISON AV, N84DG12' N 93.5FT TO E/L OF C&NW RR CO,
N272FT, S265FT TO POB., LOT 4, BLK 12, MARSTON & PRITCHARD ADD.,
LOT 21 & S1/3 OF LOT 20, BLK 4, GREEN & RANKIN'S ADD, THE S1/3 BEING
15FT ON THE E & 25FT ON THE W. EX PT IN USH 12 IN DOC 1086061.
RERECORD IN DOC 1089994., BEG AT SE/C OF LOT 9, BLK 5, GREEN &
RANKIN'S ADD,N138.5 FT,W50FT,S TO A PT ON MADI- SON AV 97.9FT W OF
POB, E97. 9FT TO POB. EX PT IN USH 12 IN DOC 1095112., BEG AT SW/C
LOT 9, BLK 5, GREEN&RANKIN'S ADD,N100.81FT S89DG46'E
40.3FT,S68DG46'E 18.35FT,E12.52FT SLY TO MAD- ISON AV TO A PT 30FT
ELY OF POB, WLY 30FT TO POB. ALSO DRVWY AGRMT IN 334-419., E40FT
OF LOT 19, BLK 4, GREEN & RANKIN'S ADD. ALSO E29FT OF S14FT LOT 18.,
LOT 19, BLK 4, GREEN & RANKINS ADD. EX E40FT., BEG INTERS S/L
MADISON AVE & E/L LINCOLN ST, S69DG27'E 126.60FT, S13DG16'W
89.60FT, S89DG52'W 98FT, N131.85FT TO POB. ALSO THAT PT LOT 2 LYG S
OF RELOCATED ALLEY. EX .003A IN USH 12 DOC 1092548., LOT 5, BLK 12,
MARSTON & PRITCHARD ADD., BEG INTERS S/L MADISON AVE & E/L
LINCOLN ST S69DG27'E 126.60FT TO POB, S13DG16'W 89.60FT, SELY ALG
CUR RAD 37FT TO EXT OF S/L LOT 1, BLK 11 WM BARRIES ADD, N89DG52'E
TO W/L ADAMS ST, N67.81FT, N69DG27'W 145.63FT TO POB., BEG ON W/L
OF N MAIN ST. 147 FT N OF N/L MADISON AV,N44FT N84DG12'W TO E/L OF
RR ROW, SLY APPROX 50FT, E TO POB., COM SW/C BLK 8 WM J BARRIE'S
ADD, S89DG51'E 152.5FT TO C/L VAC WASH ST, N142.47FT TO
POB:N95.21FT, N89DG58'W 32.5FT,N70FT TO N/L BARRIE S N89DG58'W
ALG SD N/L 120FT N299.72FT, N89DG59'E 54.91FT N0DG02'E 90.62FT TO
S/L MAD. AVE, S69DG40'E 69.42FT, S70 DG06'E 515.52FT, S26DG14'W
559.8FT, N89DG51'W 34.71FT, N142.47FT, N89DG51'W 170.01 FT TO POB.,
BEG AT NE/C LOT 1, BLK 2, ORIG. PLAT,S79FT,W105FT,N90
FT,E105FT,S11FT TO POB., BEG AT NW/C LOT 2, BLK 2, ORIG. PLAT,
N11FT,E135FT,S90 FT,W5FT,S41FT,W10FT,S7.5FT, W120FT,N137.5FT TO
POB. EX BEG 11FT N OF NW/C LOT 2, E 39.92FT, S70DG23'W 24.25FT,
S54DG40'W 22.82FT, S31DG22'W 22.82FT, S15DG37'W 24.44FT TO MAIN
ST, N53.37FT TO POB. EX BEG NW/C LOT 6, S6.5FT, ELY TO PT 7.5FT S OF
NE/C SD LOT, N7.5FT, W120FT TO POB., LOT 2,EX S25FT OF W30FT&LOT
S1&3,BLK 8,WM J BARRIES ADD ALSO W1/2 VAC WASHINGTON ST ADJ.,
LOTS 7&10 & N21FT LOT 11, BLK 2, ORIG PLAT. EX PT IN CSM 3951-19-81,
DOC 1036168, LOT 3, BLK 9, WM. J. BARRIE'S ADD., N45FT OF LOT 4 &
S25FT OF W 1/2 OF LOT 2, BLK 8, WM.J. BARRIE'S ADD., LOT 3, BLK 13, A
CONT. OF BARRIE'S ADD., S90FT OF LOT 4, BLK 9, WM. J. BARRIE'S ADD.,
LOT 4, BLK 8, WM. J. BARRIE' S ADD. EX N 45 FT., E70FT OF LOTS 1&4, BLK
Page 39 of 85
City of Fort Atkinson
TID #12 Project Plan & District Boundary
28
4, ORIG PLAT., E30FT LOT 2 & W10FT OF E90FT LOT 2 & E90FT LOT 3, BLK
3, WM.J. BARRIES ADD., W30FT LOTS 2&3, BLK 3, WM.J. BARRIES ADD.,
BEG 40FT E OF NW/C LOT 1,BLK 19, A CONT. OF BARRIE'S ADD,
S78.7FT,SE98.5FT TO RIVER- SIDE DR, NE40.5FT,NW TO PT 27FT S OF N/L
SD LOT,N27FT, W12FT TO POB. ALSO & SBJ TO ROW IN MISC 5-626. 308
RIVERSIDE DR, N30FT OF LOT 4, BLK 3, WM.J. BARRIES ADD. EX W37.5FT.,
S1/2 LOT 3 & W10FT S1/2 LOT 4, BLK 4, ORIG PLAT ALSO ESMT IN 688-
989., N30FT LOT 6, BLK 4,ORIG PLAT, BEG 238.5FT NE OF SE/C LOT 2 BLK
19,A CONT. OF BARRIE'S ADD, NW TO S/L D.313-27,NE TO PT 112FT S OF
N/L SD LOT, NE TO E/L SD LOT 89.5FT S OF NE/C, S & SE ALG E/L LOT 2 TO
SE/C LOT 1 SD ADD,SW-POB., S30FT LOT 5, BLK 4,ORIG PLAT, W48FT OF
E104FT LOT 8, BLK 4 ORIG PLAT. SUBJ TO 8FT ROW., N37FT OF W100FT
LOT 7, BLK 4 ORIG PLAT. ALSO ROW., N32FT OF E30FT OF W37FT OF LOT
2, BLK 6, ORIGINAL PLAT., N39.5FT LOT 4, BLK 6, ORIGINAL PLAT., S22FT
OF N132FT OF LOTS 1&2, BLK 7,WM.J. BARRIES ADD. SUBJ TO A ROW
OVER W6FT IN DOC 776412. ALSO 11.6FT ESMT IN DOC 888387., N54FT
LOT 8, BLK 2,ORIG PLAT, LOT 9 & S6FT LOT 8, BLK 2 ORIG PLAT. EX PT IN
CSM 3951 -19-81, DOC 1036168., LOT 4, BLK 12, WM. J. BARRIE'S ADD.,
LOT 4, BLK 13, A CONT. OF BARRIE'S ADD., LOT 3, BLK 12, WM. J.BARRIE'
S ADD. EX N24FT., W21.5FT OF LOT 1, BLK 3, WM. J. BARRIES ADD.,
W50FT OF E80FT LOT 2, BLK 3, WM.J. BARRIES ADD., S37FT OF E82.5FT OF
LOT 1, BLK 3, WM.J. BARRIES ADD. ALSO ROW IN DOC 153157. ALSO
STAIRWAY ROW. ALSO ROW IN DOC 267529., BEG 157FT W OF NE/C LOT 1,
BLK 19,A CONT OF BARRIE'S ADD,W28FT,S27FT,SELY TO PT 139.5FT,SW OF
SD NE/C, NE 32.5FT,NW TO POB., N1/2 LOT 3, BLK 4, ORIG PLAT ALSO
ROW OVER E10FT LOT 2 IN DOC 784105., N80FT OF LOT 10, BLK 3, WM. J.
BARRIES ADD. ALSO A ROW IN COMMON OVER N10FT OF S40 FT SD LOT
10., LOT 5 & E6.4FT OF LOT 4, BLK 5,CYRUS CURTIS ADD. EX N60FT OF E
15.28FT OF LOT 5., BEG AT MOST SLY COR LOT 1, BLK 19,CONT. OF
BARRIE'S ADD NE45FT, NW98.5FT,N8.7FT,W40 FT TO W/L SD LOT, S&SELY
ALG W/L TO POB., BEG 149.5FT NE OF SE/C LOT 2 BLK 19, A CONT. OF
BARRIE'S ADD,NE 89FT,NW TO S/L D.313- 27,SE TO PT 120FT S OF N/L SD
LOT,W15FT,S105FT,NE7FT, SE126FT TO POB., E56FT LOT 8, BLK 4,ORIG
PLAT, S23FT OF W100FT LOT 7, BLK 4 ORIG PLAT. SUBJ TO ROW., N22FT
OF LOTS 1&2, BLK 7, WM J. BARRIES ADD,SUB. TO A ROW OVER W6FT.
ALSO 11.6FT EASMT IN 804-113., LOTS 8, 9, 10, 11,&12 & W1/2 OF LOT 7,
BLK 1, MRS. SNELL' S ADD.ALSO W12.5FT OF C&NW RR ROW. ALSO INF IN
DEEDS 399-527 & 409-202., BEG AT THE INTER OF W/L OF N MAIN ST &
N/L OF MADISON AV,N147FT,W TO E/L OF RR, SWLY TO N/L OF MADISON
AV, SELY TO POB. EX SE 30FT TRI DEEDED TO THE CITY IN DOC 894879.,
S30FT LOT 6, BLK 4,ORIG PLAT, E20FT LOT 7 & W16FT LOT 8, BLK 4, ORIG
PLAT. ALSO ROW., BEG 72FT NE OF SE/C BLK 19, NW
75.5FT,W4FT,N85FT,E4FT,NE 7FT,SE126FT TO PT 77.5FT NE OF POB, SWLY
77.5FT TO POB, LOT 2, BLK 19, CONT OF BAR- RIE'S ADD., E24FT OF N61FT
Page 40 of 85
City of Fort Atkinson
TID #12 Project Plan & District Boundary
29
LOT 3 & W37FT OF N61FT OF LOT 2, EX N32FT OF E30FT OF W37FT OF LOT
2, BLK 6, ORIGINAL PLAT., S22FT OF N44FT OF LOTS 1&2, BLK 7,WM.J.
BARRIES ADD. SUB TO A 6FT ROW ON W SIDE. ALSO 11.6FT EASMT IN
804-113, S22FT OF N66FT OF LOTS 1&2, BLK 7,WM.J. BARRIES ADD. SUB
TO A 6FT ROW ON W SIDE. ALSO 11.6FT EASMT IN 804-113, S41FT OF
E110FT OF LOT 4, BLK 2, ORIGINAL PLAT., LOT 1, CSM 3951-19-81., W50FT
LOTS 1&4, BLK 4, ORIG PLAT. EX W10FT OF S1/2 LOT 4 SUBJ TO ESMT IN
688-989., E40FT LOT 2, BLK 4,ORIG PLAT SUBJ TO ROW OVER E10FT ALSO
ROW OVER E10FT OF N30FT LOT 3, BLK 4., W26FT OF E66FT OF N1/2 LOT 2
BLK 4, ORIG PLAT., N30FT OF W54FT LOT 2, BLK 4, ORIG PLAT., N23FT OF
E82.5FT OF LOT 1, BLK 3, WM.J. BARRIES ADD., S30FT OF W80FT LOT 2,
BLK 4, ORIG PLAT., BEG AT NE/C LOT 1, BLK 19, A CONT BARRIE'S ADD,
SW107FT, NW TO PT 80FT E OF NW/C SD LOT, E TO POB., W21.5FT OF
N30FT OF LOT 4, BLK 3, WM.J. BARRIES ADD., S30FT OF LOT 4, BLK 3,
WM.J. BARRIES ADD. EX W37.5FT., W21.5FT OF S30FT OF LOT 4, BLK 3,
WM.J. BARRIES ADD., N30FT LOT 5, BLK 4,ORIG PLAT, S40FT OF LOT 10 &
ALL OF LOT 9, BLK 3,WM.J. BARRIES ADD. SUBJ TO A 10FT ROW IN
COMMON OVER N10FT OF S40FT SD LOT10, LOTS 5,6,7&8,BLK 3, WM.J.
BARRIES ADD. ADD. INFOIN D., S22FT OF N88FT OF LOTS 1&2, BLK
7,WM.J. BARRIES ADD. SUB TO A ROW OVER W 6FT. ALSO 11.6FT ESMT IN
DOC 888387., S22FT OF N110FT OF LOTS 1&2, BLK 7,WM.J. BARRIES ADD.
SUB TO A ROW OVER W 6FT. ALSO 11.6FT EASMT IN 804-113., LOT 2 &
N1/2 LOT 3, BLK 5, ORIG PLAT., BEG SW/C LOT 2, BLK 19,CONT BARRIE'S
ADD,N110FT,E120FT, SE75.5FT,SWLY ALG RIVERSIDE DR 72FT,W132FT TO
POB. EX LD IN ST IN DOC 704378. EX PT IN USH 12 IN DOC 1155162.,
N1/2 E1/2 LOT 1,BLK 6, ORIGINAL PLAT. ALSO ADJ PT OF W1/2 VAC
EDWARD ST IN DOC 1151093., LOT 1, CSM 4145-20-179. ALSO ESMT IN
DOC 1082187. ALSO COM E/L EDWARD ST & SW/ C SD CSM, S89DG51'E
84.63FT, S10FT, N89DG51'W 84.61FT, N00DG08'W 10FT TO POB. EX COM
NW/C SD CSM, S89DG51'E 119.68FT, S10FT, N89DG51'W 119.66FT,
N00DG08'W 10FT TO POB., SE/C OF LOT 5, BLK 4, WM J BARRIE'S ADD, LYG
SE OF A LINE PARALLEL WITH & 20FT SELY FROM C/L OF C&NWRR CO'S
MOST ELY TRACK (LD LEASED TO M. MAZOR). ALSO PT VAC MECHANIC ST
IN 1143727., PCL 2, CSM 1202-4-88. ALSO PT VAC MECHANIC ST IN DOC
1169841 & 1169842., LOTS 3 & 6, BLK 12, MARSTON & PRITCHARD ADD.,
PCL 1, CSM 1202-4-88, LOT 11, BLK 3, GREEN & RAN- KIN'S ADD. EX
N66FT. EX PT IN USH 12 IN DOC 1098064., W45FT OF LOT 3, BLK 5, CYRUS
CURTIS ADD. ALSO BEG 1.5FT W OF NE/C LOT 3, WLY 13.5FT, S88FT, ELY
13.5FT N TO POB., W55FT OF LOT 1, BLK 5,CYRUS CURTIS ADD & E13.5FT
OF LOT 1, BLK 24,A CONT BARRIE'SADD, N60FT OF LOTS 5&6, EX W44.72
FT OF LOT 5, BLK 5, CYRUS CURTIS ADD. ALSO A PCL OF LD W OF C&NW
RR 30FT AT SHERMAN AV & 16FT AT ROCK RIVER., LOT 2 & E5FT OF LOT 1,
BLK 5 CYRUS CURTIS ADD., N1/2 W1/2 LOT 1,BLK 6, ORIGINAL PLAT. ALSO
PT OF FOLLOWING ADJ TO SD PCL: BEG NE/C LOT 2, BLK 6, S89DG55'W
Page 41 of 85
City of Fort Atkinson
TID #12 Project Plan & District Boundary
30
1.3FT, S0DG11'W 174FT TO RIV, ELY 2.32FT, N0DG09'W 174FT TO POB. EX
PT OF FOLLOWING FROM SD PCL: COM NE/C LOT 2, S89DG55'W 1.3FT,
S0DG11'W 78.7FT TO POB, S0DG11'W 87.4FT, S89DG56'E 6.31FT,
N0DG04'E 87.4FT, N89DG56'W 6.14FT TO POB., LOT 7, BLK 5, CYRUS
CURTIS ADD., LOT 4,EX N39.5FT, LOT 3,EX E 24FT OF N61FT, LOT 2, EX W
37FT OF N61FT, BLK 6, ORIG PLAT. EX BEG NE/C LOT 2, S89DG55'W 1.3FT,
S0DG11'W 174FT TO RIV, ELY 2.32FT TO E/L LOT 2, N0DG09'W 174FT TO
POB. ALSO COM NE/C LOT 2, S89DG55'W 1.3FT, S0DG11'W 78.7FT TO POB,
S0DG11'W 87.4FT, S89DG56'E 6.31FT, N0DG04'E 87.4FT, N89DG56'W
6.14FT TO POB., BEG 11FT W OF NE/C LOT 2,BLK 24, A CONT BARRIE'S
ADD,W47 FT, S TO RIV, E47.5FT,N-POB. ALSO DRWY AGRRE DOC 1063403.,
LOTS 3,4 & 5, BLK 7, WM. J. BARRIES ADD. ADD. INFO DEED 215-318.
ALSO 11.6FT EASMT IN 804-113., BEG 132FT S OF NE/C OF BLK 7 WM.J.
BARRIES ADD,W120FT,S26 FT,E120FT,N26FT TO POB. SUBJ TO ROW. ALSO
11.6FT ESMT IN DOC 888387., LOT 5, BLK 2, ORIGINAL PLAT., LOT 6, BLK
2, ORIG PLAT., W64FT OF LOT 1 & E11FT LOT 2 BLK 24, A CONT. BARRIE'S
ADD, BEG 58FT W OF NE/C LOT 2,BLK 24,A CONT OF BARRIE'S ADD,W
32FT,SW49FT,S TO RIV,E47.5FT N TO POB. ALSO DRWY AGREE DOC
1063403. EX PT IN USH 12 IN DOC 1156039., LOT 2, BLK 24,A
CONT.BARRIE' S ADD. EX E 106FT. EX PT IN USH 12 IN DOC 1151769., COM
NE/C LOT 4, BLK 5, CYRUS CURTIS ADD, W6.40FT TO POB, W55.10FT,
S00DGE 88FT, W13.5 FT, S00DGE 99.79FT, S61DG49' E 71.74FT,
N26DG33'E 12FT, N00DGW 203.33FT TO POB. ALSO LD LYG BTW M/L &
RIV., ALL LD BTWN RIVERSIDE DR & ROCK RIV. FROM W/L REPLAT
ALPETER'S ADD TO W/L BLK 24, CONT OF BARRIE'S ADD. ALSO A TRI PCL
BOUNDED ON N BY VAN BUREN ST, ON W BY ROBERT ST & E BY RIVERSIDE
DR., S1/2 LOT 1, BLK 6, ORIG PLAT ALSO PT OF FOLLOWING ADJ TO SD
PCL: BEG NE/C LOT 2,BLK 6 S89DG55'W 1.3FT, S0DG11'W 174FT TO RIV,
ELY 2.32FT, N0DG09'W 174FT TO POB. EX PT OF FOLLOWING FROM SD
PCL: COM NE/C LOT 2, S89DG55'W 1.3FT, S0DG11'W 78.7FT TO POB,
S0DG11'W 87.4FT, S89DG56'E 6.31FT, N0DG04'E 87.4FT, N89DG56'W
6.14FT TO POB. ALSO ADJ PT OF W1/2 VAC EDWARD ST IN DOC 1151093.,
BEG NE/C BLK 1, WM.J.BARRIES ADD,N69DG50'W 189.38FT,S63DG 35'E
182.99FT, SELY 26.34FT, N 38.5FT TO POB. U.S.H 12., COM NE/C BLK 1,
WM J BARRIES ADD, S23FT TO POB, N63DG35'W 198.49FT TO E ROW/L RR,
SWLY ON SD/L 201.1FT, S83DG55'E 163.67FT,S67DG47'W 107.44FT, N TO
POB. EX PT IN ST., LOT 1, CSM 6552, DOC 1493301, LOT 2, CSM 6552, DOC
1493301
Page 42 of 85
City of Fort Atkinson
TID #12 Project Plan & District Boundary
31
Section 25: Disclaimer Text
Robert W. Baird & Co. Incorporated is providing this information to you for
discussion purposes. The materials do not contemplate or relate to a future
issuance of municipal securities. Baird is not recommending that you take
any action, and this informa tion is not intended to be regarded as “advice”
within the meaning of Section 15B of the Securities Exchange Act of 1934 or
the rules thereunder.
Page 43 of 85
Page 44 of 85
Page 45 of 85
Page 46 of 85
City of Fort Atkinson
City Manager's Office
101 N. Main Street
Fort Atkinson, WI 53538
MEMORANDUM
DATE: August 31, 2026
TO: Fort Atkinson City Council
FROM: Rebecca Houseman, City Manager
RE: Review and possible action on a Resolution adopting the project plan and
boundaries for Tax Incremental District (TID) No. 13, City of Fort Atkinson,
Jefferson County, Wisconsin (Houseman, City Manager)
BACKGROUND
The City is proposing to create a new Tax Incremental District (TID) No. 13, generally located in
the area around Main Street and then primarily along Water Street, Milwaukee Avenue, and
Third Street, located within the City's limits. The project plan, maps, and notices are included
with this memo for review by the City Council and the Public. TID 13 will be classified as a
blighted district based on the identification and classification of the property proposed to be
included within the district.
The Plan Commission held a public hearing at their meeting on July 28, 2026, relating to the
project plan and boundaries for TID No. 13 and adopted a Resolution recommending the City
Council approve the TID. The City Council reviewed this matter at the meeting on August 18,
2026, and adopted the attached Resolution approving the Project Plan.
DISCUSSION
There are 80 parcels proposed to be included in TID No. 13, for a total of about 18 acres of land.
The estimated fair market value of the land and improvements in the TID is $23,045,300. If this
TID is created, the taxes based on that land value will continue to be distributed to the four
taxing jurisdictions. If created, the taxes on the additional value in the TID over its life will go
into a separate fund for use in supporting development and installing infrastructure and
improvements within the TID.
Possible projects include Market Square Improvements, Whitewater Avenue and Main Street
Intersection Safety Improvements, South Main Street and South Third Street rehabilitation,
public parking lot reconstruction, utility improvement projects, road and intersection
improvements, possible City land purchases, park/trail improvements and extensions, entryway
signage improvements, regional stormwater improvements, pedestrian/bicycle path extensions
and improvements, direct development incentives, financing and interest, and administrative
and organizational fees. These projects are further described in the proposed project plan.
Page 47 of 85
A public notice for this public hearing was mailed to each taxing jurisdiction on July 7, 2026. In
addition, it was published in the Jefferson County Daily Union as a Class 2 Notice on July 14,
2026, and July 21, 2026. The Joint Review Board held its initial meeting to review this matter on
July 27, 2026. The Plan Commission held a public hearing on July 28th and adopted a Resolution
recommending that the City Council approve the project plan and boundaries as submitted. The
City Council adopted a Resolution approving the Project Plan at the meeting on August 18th.
FINANCIAL ANALYSIS
Approval of the TID will provide financing for projects within the TID and is expected to increase
the overall tax base of the City.
RECOMMENDATION
Staff recommends that the Joint Review Board adopt the resolution recommending approval of
the Project Plan and Boundaries for Tax Incremental District No. 13, City of Fort Atkinson,
Jefferson County, Wisconsin.
ATTACHMENTS
1. Combined-Public-Notices-Fort Atkinson TID 13 Creation blight
2. 7.7.26 Taxing Entities Public Hearing Notice TID 13 creation
3. Res 1466 TID 13 Creation - Plan Comm
4. 8.13.26 TID #13 Creation Resolution City Council
5. TID#13 creation DRAFT 3 project plan Fort Atkinson 072226
Page 48 of 85
NOTICE OF PUBLIC HEARING AND JOINT REVIEW BOARD MEETING
REGARDING THE PROPOSED PROJECT PLAN
FOR TAX INCREMENTAL DISTRICT (TID) NUMBER 13
IN THE CITY OF FORT ATKINSON, WISCONSIN
NOTICE IS HEREBY GIVEN, that the City of Fort Atkinson will hold an organizational Joint Review
Board (JRB) meeting on July 27, 2026, at 3 p.m. in the Municipal Building Council Chambers, located
at 101 N. Main Street, Fort Atkinson, WI 53538. The purpose of this meeting is to organize a JRB to
consider the proposed project plan for TID 13. The meeting is open to the public.
NOTICE IS HEREBY GIVEN, that the Plan Commission, of the City of Fort Atkinson, will hold a public
hearing on July 28, 2026, at 4 p.m., in the Municipal Building Council Chambers, 101 N. Main Street,
Fort Atkinson, WI regarding the proposed project plan for TID 13 in the City.
Access meeting online:
https://us02web.zoom.us/j/82214860406?pwd=TEVyUVdQM05VNFVzb0E2TUNTVnZlZz09; Meeting
ID: 822 1486 0406; Passcode: 53538; Dial by Location +1 312 626 6799. Contact Sarah Weihert at
920-397-9901 to request accommodation or access assistance.
City of Fort Atkinson TID 13 is generally located in the area in the City around Main Street and then
primarily along Water Street, Milwaukee Avenue, and Third Street located within the City's limits.
TID 13 will be classified as a blighted district based on the identification and classification of the
property proposed to be included within the district.
Proposed public project improvements may include but are not limited to sanitary sewer and water
system improvements, road curb and gutter, intersection, and storm water infrastructure
improvements, street improvements, lighting, sidewalks, multi-use trail and park improvements,
entryway signage, pedestrian and bicycle path extensions, professional and organizational services,
administrative costs, and finance costs.
As part of the project plan, cash grants may be made by the City of Fort Atkinson to owners, lessees,
or developers of property within TID 13.
The proposed costs include projects within the proposed boundary and within a one-half mile radius of
the boundary of the district.
At the public hearing, all persons will be afforded a reasonable opportunity to be heard concerning the
proposed project plan. A copy of the TID 13 project plan and boundary is available for inspection and
will be provided upon request. Arrangements for either inspection or receipt of a copy of the project
plan may be made by contacting the City Manager, Municipal Building, 101 N. Main Street, Fort
Atkinson, WI 53538; Phone (920) 397-9901.
Dated the 6th day of July 2026
Rebecca Houseman
City Manager
Publication Date: July 14, 2026 and July 21, 2026.
Page 49 of 85
VIA EMAIL-RETURN RECEIPT REQUESTED
July 7, 2026
Michael Luckey, County Administrator, Jefferson County
Shawna Marquardt, Dean of Regional Campuses, Madison Area Technical College
Nathan Knitt, Director of Business Services, School District of Fort Atkinson
Rebecca Houseman, City Manager, City of Fort Atkinson
Jonah Ralston, City of Fort Atkinson resident, Public Member (nominated)
RE: Notice of Public Hearing and Joint Review Board dates-Regarding Proposed Project Plan & District
Boundary for Tax Incremental District No. 13 of the City of Fort Atkinson, Wisconsin
Dear Joint Review Board Member,
The City of Fort Atkinson is proposing the creation of Tax Increment al District No. 13 in the City. Pursuant to
Section 66.1105 of Wisconsin Statues, we need to hold our first meeting of the Joint Review Board within 14
days from the first public notice publication on July 14, 2026, and before the public hearing scheduled for July
28, 2026.
This letter is to inform you that a public hearing will be held on Tuesday, July 28, 2026, at 4 p.m. in the Fort
Atkinson Municipal Building Council Chambers, 101 N. Main Street, regarding the Proposed Project Plan and
District Boundary for Tax Incremental District No. 13 of the City of Fort Atkinson, Wisconsin.
The Wisconsin Tax Incremental Law provides that a Joint Review Board must be established with respect to the
proposed project plan and must include members chosen by Jefferson County, Madison Area Technical College,
School District of Fort Atkinson, City of Fort Atkinson and one public member chosen by a majority of the other
Joint Review Board members.
The first meeting of the Joint Review Board will be held on Monday, July 27, 2026 at 3 p.m. in the Fort
Atkinson Council Chambers, 101 N. Main Street. The purpose of the meeting will be to review the role of
the Joint Review Board, elect a chairperson and a public member, and discuss the district’s creation.
Enclosed is a copy of the agenda for that meeting and a copy of the notice of public hearing for the
Proposed Project Plan and District Boundary of Tax Incremental District No. 13.
The second Joint Review Board meeting has been scheduled for Monday, August 31, 2026 at 3 p.m.
Thank you for your cooperation in this important matter. If you have any questions or require further information,
please contact me at 920-397-9901 or rhouseman@fortatkinsonwi.gov.
Sincerely,
Rebecca Houseman
City Manager
Page 50 of 85
Page 51 of 85
Page 52 of 85
Resolution Formally Establishing the Boundaries of and Approving the Project Plan for
Tax Incremental District No. 13
ESTABLISHING THE BOUNDARIES OF AND APPROVING THE PROJECT PLAN FOR TAX
INCREMENTAL DISTRICT NO. 13, CITY OF FORT ATKINSON, JEFFERSON COUNTY,
WISCONSIN
WHEREAS, pursuant to Wisconsin Statutes §66.1105 the City of Fort Atkinson has
determined that use of Tax Incremental Financing is required to promote development
and redevelopment within the City; and
WHEREAS, Tax Incremental District No. 13 (“the district”) is proposed to be
created as a “blighted area district” based on findings that at least 50 percent (by area) of
the real property within the District is a blighted area; and
WHEREAS, a Project Plan for Tax Incremental District No. 13 has been prepared
that includes the following:
1. A statement listing the kind, number, and location of proposed public works or
improvements within the district.
2. An economic feasibility study.
3. A detailed list of estimated projects costs.
4. A description of the methods of financing all estimated project costs and the time
when the related costs or monetary obligations are to be incurred.
5. A map showing existing uses and conditions of real property in the district.
6. A map showing proposed improvements and uses in the district.
7. Proposed changes of zoning ordinance, master plan, map, building codes, and City
Ordinances.
8. A statement of the proposed method for relocation of any person to be displaced.
9. A statement indicating how creation of the district promotes the orderly
development of the City.
10. A list of estimated non-project costs.
11. A section for the eventual insertion of a boundary legal description to be
completed upon approval of this resolution.
12. A section for the eventual insertion of An Opinion of the City Attorney advising
that the plan is complete and complies with Wis. Statute §66.1105(4)(f); and
WHEREAS, in accordance with the procedures specified in the Tax Increment Law,
the Plan Commission, on July 28, 2026, held a public hearing concerning the project plan
and boundaries and proposed creation of the district providing interested parties a
reasonable opportunity to express their views on the proposed creation of a tax
incremental district and the proposed boundaries of the district; and
WHEREAS, after said public hearing, the Plan Commission adopted a resolution
and recommended to the City Council that it create the district.
Page 53 of 85
Resolution Formally Establishing the Boundaries of and Approving the Project Plan for
Tax Incremental District No. 13
NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Fort Atkinson
that:
1. The Recitals set forth above are incorporated herein and are made an enforceable
part of this resolution.
2. The boundaries of the district are hereby approved and established, only includes
whole parcels and is contiguous, as legally described in Exhibit A attached and
incorporated herein by reference.
3. The City of Fort Atkinson hereby creates Tax Increment District No. 13 on August
18, 2026, effective January 1, 2026.
4. The City Council finds and declares that:
a. At least 50 percent (by area) of the real property within the District is a
blighted area as defined in Wisconsin Statute Section 66.1105(2)(ae)1.
b. Based upon the findings, as stated in (a) above, the District is declared to
be a blighted area district based on the identification and classification of
the property included within the district.
c. The project costs relate directly to eliminating blight in the district
consistent with the purpose for which the district is created.
d. The equalized value of the taxable property in the district plus the value
increment of all other existing tax incremental districts within the City does
not exceed 12% of the total equalized value of taxable property within the
City.
e. The improvement of the area is likely to significantly enhance all the other
real property’s value in the district.
f. The private development activities projected in the Project Plan would not
occur without tax incremental financing.
g. Confirms the project plan “is feasible and in conformity” with the City of
Fort Atkinson’s master plan.
h. The City estimates less than 35% of the territory within the district will be
devoted to retail business at the end of the district’s maximum
expenditure period, pursuant to Section §66.1105 (5)(b) of the Wisconsin
Statutes.
i. Confirms for any annexed parcels not within the municipality’s boundaries
on January 1, 2004, three years have elapsed since the territory was
annexed.
5. The Project Plan, prepared by Robert W. Baird & Co. dated August 18, 2026, which
is incorporated herein in its entirety by reference, is approved and adopted and
the City further finds that plan is feasible and in conformity with the master plan
of the City.
BE IT FURTHER RESOLVED THAT the City Clerk is hereby authorized and directed to
apply to the Wisconsin Department of Revenue, in such form as may be prescribed, for a
Page 54 of 85
Resolution Formally Establishing the Boundaries of and Approving the Project Plan for
Tax Incremental District No. 13
“Determination of Tax Incremental Base”, as of January 1, 2026, pursuant to the
provisions of Section §66.1105 (5) (b) of the Wisconsin Statutes.
BE IT FURTHER RESOLVED THAT the City Assessor is hereby authorized and directed
to identify upon the assessment roll returned and examined under section §70.45 of the
Wisconsin Statutes, those parcels of property which are within the District, specifying
thereon the name of the District, and the City Clerk is hereby authorized and directed to
make similar notations on the tax roll made under Section §70.65 of the Wisconsin
Statutes, pursuant to Section §66.1105(5)(f) of the Wisconsin Statutes.
Adopted this 18th day of August 2026
City of Fort Atkinson
By ______________________________
Kyle Jaeckel, President
CERTIFICATION
I hereby certify that the foregoing Resolution was duly adopted by the City Council of
the City of Fort Atkinson on the 18th day of August 2026.
____________________________
Michelle Ebbert,
City of Fort Atkinson
City Clerk
Page 55 of 85
City of Fort Atkinson
TID #13 Project Plan & District Boundary
1
Project Plan & District Boundary
Tax Incremental District No. 13
in the
CITY OF FORT ATKINSON, WISCONSIN
August 18, 2026
(Approved Actions)
Organizational Joint Review Board Meeting Held July 27, 2026
Public Hearing Held July 28, 2026
Adopted by Planning Commission July 28, 2026
Adopted by City Council August 18, 2026
Adopted by Joint Review Board August 31, 2026
Prepared in part by:
Robert W. Baird & Co.
Public Finance
777 E. Wisconsin Ave.
Milwaukee, WI 53202
800.792.2473
Page 56 of 85
City of Fort Atkinson
TID #13 Project Plan & District Boundary
2
Table of Contents
Section 1: City of Fort Atkinson Officials ............................................................................... 3
Section 2: Introduction and Description of District ............................................................... 4
Section 3: Summary of Findings ............................................................................................ 5
Section 4: Map of Proposed District Boundary ...................................................................... 8
Section 5: One Half Mile Radius Map of Proposed District Boundary ..................................... 9
Section 6: Map Showing Existing Uses and Conditions ........................................................ 10
Section 7: Preliminary Parcels List and Analysis ................................................................. 11
Section 8: Equalized Valuation Test .................................................................................... 12
Section 9: Statement of Kind, Number and Location of Proposed Projects .......................... 13
Section 10: Maps Showing Proposed Improvements and Uses ............................................ 13
Section 11: Detailed List of Project Costs ............................................................................ 16
Section 12: Economic Feasibility ......................................................................................... 17
Section 13: Method of Financing and Timing of When Costs are to be Incurred. ................. 18
Section 14: Annexed Property ............................................................................................. 21
Section 15: Proposed Changes in Zoning Ordinances .......................................................... 21
Section 16: Proposed Changes in Master Plan, Map, Building Codes, and City Ordinances .. 21
Section 17: Relocation ........................................................................................................ 21
Section 18: Orderly Development of the City ...................................................................... 21
Section 19: A List of Estimated Non-Project Costs .............................................................. 22
Section 20: City Attorney Opinion ....................................................................................... 22
Section 21: Exhibit A Cash Flow Proforma Analysis ............................................................. 23
Section 22: Estimated Tax Increments By Taxing Entity ..................................................... 24
Section 23: Exhibit B City Attorney Opinion ........................................................................ 25
Section 24: Exhibit C TID #13 Boundary Legal Description ................................................. 27
Section 25: Disclaimer Text ................................................................................................ 30
Page 57 of 85
City of Fort Atkinson
TID #13 Project Plan & District Boundary
3
Section 1: City of Fort Atkinson Officials
City Council
Kyle Jaeckel President
Davin Lescohier President Pro Tem
Bruce Johnson Council Member
Peggy Huckabee Council Member
Jena Price Council Member
City Staff
Rebecca Houseman City Manager
Michelle Ebbert City Clerk/Treasurer/Finance Director
Zach Navin Director of Public Works
David Westrick City Attorney
Jedidiah Draeger Director of Neighborhood & Building Services
Sarah Weihert Public Relations/Executive Assistant
Planning Commission
Rebecca Houseman, Chairperson Diana Shull
Peggy Huckabee, Council Representative Vacant Citizen Position
John Ciccarelli Zach Navin, Secretary
Eric Schultz
Joint Review Board
Rebecca Houseman City Representative - Chairperson
Michael Luckey Jefferson County
Shawna Marquardt Madison Area Technical College
Nathan Knitt Fort Atkinson School District
Jonah Ralston Public Member
Page 58 of 85
City of Fort Atkinson
TID #13 Project Plan & District Boundary
4
Section 2: Introduction and Description of District
The City plans to use Tax Incremental Financing (“TIF”) as a successful
economic development programming tool by providing public improvements
and development incentives to encourage and promote residential and
commercial development. The goal is to increase the t ax base, to create and
enhance economic opportunities, and to increase housing options within the
City. The City works with developers and property owners to provide
infrastructure improvements and incentives for development. Public
infrastructure and property improvements will be financed by a combination
of TIF increments and debt financing.
The Tax Increment District (“TID”) is being created as a “Blight District” based
on the identification and classification of the property proposed to be included
in the TID. Not less than 50% by area of the real property within the District
is a blighted area as defined by Wis. Stat. § 66.1105(2)(ae)1. A blighted area
is property that may consist o f but is not limited to structural deterioration,
health and safety hazards, environmental issues, or economic stagnation. The
maximum life (absent extension) of the TID is 27 years from the date of
adoption.
Tax incremental financing is being proposed to encourage and support
development within the District. Said financing is intended to be used for the
projects outlined in this Project Plan (“Plan”). The District is located wholly
within the City of Fort Atkinson. Any proposed and potential new development
will generate additional property taxes (tax increment) that will be used to
offset the cost of the public investments resulting from, or needed by, the new
development. Planned or potential development projects are detailed in the
Statement of Kind, Number and Location of Proposed Projects section of this
Plan.
The City anticipates various public improvement project cost expenditures of
approximately $17,425,000 including financing/interest costs during the TID’s
22-year expenditure period. Proposed public project improvements may
include but not limited to developer incentives in the form of cash grants or
TID loans, infrastructure improvements, professional and organizational
services, administrative costs, and finance costs.
As a result of the creation of this TID, the City projects a preliminary and
conservative cash flow analysis indicating approximately $20,162,000 in
increments. The TID increment will primarily be used to pay the debt service
costs of the TID, project costs within the TID, and project development
incentives. The increment may be used for bicycle/pedestrian connections ,
street/sidewalk improvements, riverwalk and streetscape improvements, and
Page 59 of 85
City of Fort Atkinson
TID #13 Project Plan & District Boundary
5
other infrastructure improvements within the vicinity of the district. The City
projects land and improvement values (incremental value) of approximately
$32,500,000 will be created in the TID by the end of 20 53. This additional
value will be a result of the improvements made, and projects undertaken
within the TID. If the project generates less in value than anticipated, any
shortfall in paying of the loan incentive is borne by the developer.
Maps depicting the boundaries and existing uses and conditions of the TID are
found in the respective mapping sections of this Plan.
Section 3: Summary of Findings
As required by Wis. Stats. § 66.1105, and as documented in this Project Plan
and the exhibits contained and referenced herein, the following findings are
made:
1. That the area described herein on the boundary map (page 6) is a
blighted area as defined in Section 66.1105(2)(ae), Wisconsin
Statutes, that the property substantially impairs or arrests the sound
growth of the city and is in need of redevelopment and that “but for”
the creation of this TID, the development projected as detailed in this
Project Plan: 1) would not occur; or 2) would not occur in the manner,
at the values, or within the timeframe desired by the City. In making
this determination, the City has considered the following information:
• Development within the TID has not occurred at the pace anticipated
by the City. Infrastructure and other development related expenses
are not likely to be borne exclusively by private developers;
therefore, the City has concluded that public investment will be
required to fully achieve the City’s objectives for this area.
• To achieve its objectives, the City has determined that it must take
an active role in encouraging development by making appropriate
public expenditures in the area. Witho ut the availability of tax
increment financing, these expenditures are unlikely to be made.
Enhancement of this area will complement existing venues in the
City, and benefit, not only the City, but all overlapping taxing
jurisdictions. Accordingly, the costs to implement the needed
projects and programs are appropriately funded through tax
increment financing.
• In order to make the area included within the TID suitable for
development, the City will need to make a substantial investment to
Page 60 of 85
City of Fort Atkinson
TID #13 Project Plan & District Boundary
6
pay costs of some or all of the projects listed in the project plan and
to maintain a rent structure that does not exceed the upper end of
market levels. Due to the public investment that is required, the City
has determined that development of the area will not occur at the
pace or levels desired solely as a result of private investment.
2. The economic benefits of the Tax Incremental District, as measured by
increased property values, are sufficient to compensate for the cost of
the improvements. In making this determination, the City has
considered the following information:
As demonstrated in the Economic Feasibility Section of this Project
Plan, the tax increments projected to be collected and the debt issuance
will be more than sufficient to pay for the proposed project costs. On
this basis alone, the finding is supported.
3. The benefits of the proposal outweigh the anticipated tax increments
to be paid by the owners of property in the overlying taxing
jurisdictions.
Since the development expected to occur is unlikely to take place
without the use of Tax Incremental Financing (see Finding #1) and since
the TID will generate economic benefits that are more than sufficient to
compensate for the cost of the improvements (see Finding #2), the City
reasonably concludes that the overall benefits of the TID outweigh the
anticipated tax increments to be paid by the owners of property in the
overlying taxing jurisdictions. It is further concluded that since the “but
for” test is satisfied, there would, in fact, be no foregone tax increments
to be paid in the event the TID is not created.
4. The improvements to be made within the TID are likely to significantly
enhance the value of substantially all other real property in the City
surrounding the TID.
5. The equalized value of taxable property of the TID does not exceed
12% of the total equalized value of taxable property within the City.
6. The Project Plan for the TID is feasible and is in conformity with the
master plan of the City.
7. The City estimates that less than 35% of the territory within the District
will be devoted to retail business at the end of the District’s maximum
expenditure period, pursuant to Wisconsin Statutes Sections
66.1105(5)(b).
Page 61 of 85
City of Fort Atkinson
TID #13 Project Plan & District Boundary
7
8. The TID is being created by the City as a blight district. As described in
Finding #1 above, 50% or more of the proposed district’s area is a
blighted area.
Page 62 of 85
City of Fort Atkinson
TID #13 Project Plan & District Boundary
8
Section 4: Map of Proposed District Boundary
Current Map is reflective of the 01/01/2026 parcel list.
Page 63 of 85
City of Fort Atkinson
TID #13 Project Plan & District Boundary
9
Section 5: One Half Mile Radius Map of Proposed District Boundary
Page 64 of 85
City of Fort Atkinson
TID #13 Project Plan & District Boundary
10
Section 6: Map Showing Existing Uses and Conditions
Page 65 of 85
City of Fort Atkinson
TID #13 Project Plan & District Boundary
11
Section 7: Preliminary Parcels List and Analysis
As of 01/01/2026 parcel list.
Page 66 of 85
City of Fort Atkinson
TID #13 Project Plan & District Boundary
12
Section 8: Equalized Valuation Test
The following calculations demonstrate that the City is in compliance with
s.66.1105(4)(gm)4.c. Wis. Stats., which requires that the equalized value of
the taxable property in the proposed TID, plus the value increment of any
existing Tax Incremental Districts, does not exceed 12% of the total equalized
value of taxable property within the City. With TID #13, the value increment
of all existing Tax Increment Districts will be approximately 4.20%.
Valuation Test Compliance Calculation
2025 Projected Equalized Valuation (TID IN) $ 1,555,582,500
Limit for 12% Test $ 186,669,900
Increment Value of Existing TIDs $ 42,303,600
Projected Base Value of New TID $ 23,045,300
Total Value Subject to Test $ 65,348,900
Compliance ($65,348,900 < $186,669,900) Meets Requirement
Page 67 of 85
City of Fort Atkinson
TID #13 Project Plan & District Boundary
13
Section 9: Statement of Kind, Number and Location of
Proposed Projects
The City expects to implement the followi ng public project improvements .
Any costs including eligible administrative costs necessary or convenient to
the creation of the district or directly or indirectly related to the public works
and other projects are considered "project costs" and eligible to be paid with
tax increment revenues of the TID.
Project Descriptions
1. Market Square Improvements – creation of a market square at the
South Water Street and Milwaukee Avenue parking lot. Per the
2025 Council-adopted Main Street Corridor Plan, recommendations
include reconstructing the parking lot and a portion of S. Water St.
and Milwaukee Ave., adding market square features called out in
the plan including plantings, signage, bumpouts, and placemaking
features.
2. Whitewater Avenue and Main Street Intersection Safety
Improvements – improvements may include reconfiguring the
intersection roadway so that Main Street intersects Whitewater
Avenue at a 90-degree angle, new driveway access points to
Whitewater Avenue, add green space/pocket park area at the
Page 68 of 85
City of Fort Atkinson
TID #13 Project Plan & District Boundary
14
corner, add painted cross walk ladder markings per MUTCD
standards and commission a traffic study prior to changes, per the
2025 Council-adopted Main Street Corridor Plan.
3. South Main Street Improvements – South Third Street to Rockwell
Avenue. Improvements may include traffic signals and/or
circulation improvements, safety improvements, and pedestrian and
bicycle improvements in general, per the 2025 Council-adopted
Main Street Corridor Plan.
4. South Third Street rehabilitation – Improvements may include
traffic signals and/or circulation improvements, safety
improvements, and pedestrian and bicycle improvements in
general, per the 2025 Council-adopted Main Street Corridor Plan.
5. Public Parking Lot Reconstruction – Improve and reconstruct
downtown parking lots.
6. Park/Trail Improvements – Rock River Riverwalk reconstruction,
extension and/or improvements, or other improvements identified
in the City’s Comprehensive Plan (2022), Comprehensive Outdoor
Recreation Plan (2023), or through a planned development. This
may include a connection to the Glacial River Bike Trail system.
7. Utility and Road Improvements –within ½ mile of the TID
boundaries to support the proper and responsible development of
the TID.
8. Entryway and Wayfinding Signage Improvements – prepare for
possible new entryway signage and/or wayfinding signage at Main
Street entrance points and throughout the project area.
9. Streetscape Enhancements and Green Infrastructure Improvements
– Improve downtown aesthetics by diversifying street trees, adding
uniform street lighting, adding uniform planters containing dwarf
shrubs or small flowering annuals. Adding trash cans, bicycle racks
and benches in a uniform color and design, etc., per the 2025
Council-adopted Main Street Corridor Plan.
10. Regional Stormwater Improvements – regional stormwater
improvements may include public or private stormwater detention
and retention within the TID and within ½ mile of the TID
boundaries.
11. Pedestrian/Bicycle Path Extensions and Improvements – Glacial
River Bike trail pedestrian and bicycle path future extensions and
connections may be considered within the TID and within ½ mile of
the TID.
12. City Land Purchases – the City may purchase land throughout the
life of the TID for public infrastructure, parkland, and/or if an
opportunity arises where the purchase of land would benefit the
City and the TID.
Page 69 of 85
City of Fort Atkinson
TID #13 Project Plan & District Boundary
15
13. Direct Developer Assistance – Direct developer assistance and
incentives may be utilized through TIF in order to take advantage
possible development opportunities for the redevelopment of
blighted properties.
14. Financing and Interest – the cost of issuance and interest on
borrowing needed for projects along with interest due to
development for any developer incentive loan in the redevelopment
of blighted properties.
15. Administrative & Organizational Fees – City staff and consultants
planning, engineering, legal, and administrative fees, along with
organizational fees, Department of Revenue annual fees, and the
costs associated with the creation of this TID.
Page 70 of 85
City of Fort Atkinson
TID #13 Project Plan & District Boundary
16
Section 10: Maps Showing Proposed Improvements and Uses
Page 71 of 85
City of Fort Atkinson
TID #13 Project Plan & District Boundary
17
Section 11: Detailed List of Project Costs
1. INFRASTRUCTURE IMPROVEMENTS $10,775,000
2. DEVELOPER ASSISTANCE $1,500,000
4. LAND PURCHASES $750,000
4. FINANCING & INTEREST $4,000,000
5. ADMINISTRATIVE & ORGANIZATION FEES $400,000
ESTIMATED TOTAL $17,425,000
The project cost is based on current prices and preliminary estimates. The City
reserves the right to increase this cost to reflect inflationary increases and
other uncontrollable circumstances between the creation of the TID and the
time of construction. The tax increment allocation is preliminary and is subject
to adjustment based upon the implementation of the Plan.
This Plan is not meant to be a budget nor an appropriation of funds for specific
projects, but a framework within which to manage projects. All costs included
in the Plan are estimates based on the best information available. The City
retains the right to delete or pursue future projects listed in the prior
paragraph, and shown on the map, or change the scope and/or timing of
projects implemented as they are individually authorized by the City Council,
without amending the Plan.
The City has provided a full list of projects that would only be included in the
TID in the event sufficient increment growth is expected to be generated. The
City reserves the right to replace specific projects within the general
categories stated in Section 9 to better meet the needs of the development as
it progresses.
The Plan authorizes the expenditure of funds for project costs within a ½ mile
radius of the TID boundary.
Section 12: Economic Feasibility
The information and exhibits contained within this project plan demonstrate
that the proposed TID is economically feasible in so far as:
Page 72 of 85
City of Fort Atkinson
TID #13 Project Plan & District Boundary
18
• The City has available to it the means to secure the necessary financing
required to accomplish the projects contained within this Plan. A listing of
“Method of Financing and Timing of When Costs are to be Incurred” follows.
• The development anticipated to occur because of the implementation of
this Plan will generate sufficient tax increments to pay for the cost of the
projects. This Plan identifies the following: 1) the development expected
to occur, 2) a projection of tax increments to be collected resulting from
that development and other economic growth within the TID, and 3) a
cash flow model demonstrating that the projected tax increment
collections and all other revenues available such as debt issuance will be
sufficient to pay all Project Costs.
To evaluate the economic feasibility of TID #13 it is necessary to project the
amount of tax revenue that can be reasonably generated over the legal life
of the TID. Included in Exhibit A is a proforma analysis of TID # 13. The
proforma analyzes expenses based on project plan costs of TID #13 against
projected TID revenue. Tax revenue is conservatively estimated. Cash
received from future TID # 13 tax increments will be used to fund project
costs and i mplementation of this Plan. In 2054, the final year of revenue
collection for the TID, it is projected to have repaid all expenditures and is
left with a positive surplus balance.
Section 13: Method of Financing and Timing of When Costs
are to be Incurred.
The City plans to fund project costs with cash received from future TID # 13
tax increments and to issue a developer grant/loan to provide direct or indirect
financing for the projects to be undertaken. The following is a list of the types
of obligations the City may choose to utilize.
General Obligation (G.O.) Bonds or Notes (BAN, NAN, TAN)
The City may issue G.O. Bonds or Notes to finance the cost of Projects
included within this Plan. Wisconsin Statutes limit the principal amount of
G.O. and State Trust Fund Loan debt that a community may have outstanding
at any point in time to an amount not greater than five percent of its total
equalized value (including increment values).
Community Development Authority Lease Revenue Bonds:
Pursuant to Section 66.1335 Wisconsin Statutes (i.e., the “Community
Development Authority Law”) the City may issue Community Development
Page 73 of 85
City of Fort Atkinson
TID #13 Project Plan & District Boundary
19
Authority Lease Revenue Bonds to finance projects included within this Plan.
Lease Revenue Bonds are not general obligations of the City and therefore
do not count against the City’s borrowing capacity. To the extent tax
increments collected are insufficient to meet the annual debt service
requirements of the revenue bonds, the City may be subject to either a
permissive or mandatory requirement to appropriate on an annual basis a
sum equal to the actual or projected shortfall.
Tax Increment Revenue Bonds
The City has the authority to issue revenue bonds secured by the tax
increments to be collected. These bonds may be issued directly by the City or
as a Lease Revenue Bond by a Community Development Authority (CDA). Tax
Increment Revenue Bonds and Lease Revenue Bonds are not general
obligations of the City and therefore do not count against the cities. borrowing
capacity. To the extent tax increments collected are insufficient to meet the
annual debt service requirements of the revenue bonds, the City may be
subject to either a permissive or mandatory requirement to appropriate on an
annual basis a sum equal to the actual or projected shortfall.
Utility Revenue Bonds
The City can issue revenue bonds to be repaid from revenues of the sewer
and/or water systems, including revenues paid by the City that represent
service of the system to the City. There is neither a statutory nor constitutional
limitation on the amount of revenue bonds that can be issued, however, water
rates are controlled by the Wisconsin Public Service Commission and the City
must demonstrate to bond underwriters its ability to repay revenue debt with
the assigned rates. To the extent the City utilizes utility revenues other than
tax increments to repay a portion of the bonds, the City must reduce the total
eligible Project Costs in an equal amount.
Board of Commissioners of Public Lands State Trust Fund Loans
The City may issue State Trust Fund Loans to finance the cost of Projects
included within this Plan. Wisconsin Statutes limit the principal amount of
State Trust Fund Loan and GO debt that a community may have outstanding
at any point in time to an amount not greater than five percent of its total
equalized value (including increment values).
Bonds Issued to Developers (“Pay as You Go” Financing)
The City may issue a bond to one or more developers who provide financing
for projects included in this Plan. Repayment of the amounts due to the
developer under the bonds are limited to an agreed percentage of the
available annual tax increments collected that result from the improvements
made by the developer. To the extent the tax increments collected are
insufficient to make annual payments, or to repay the entire obligation over
Page 74 of 85
City of Fort Atkinson
TID #13 Project Plan & District Boundary
20
the life of the District, the City’s obligation is limited to not more than the
agreed percentage of the actual increments collected . Bonds issued to
developers in this fashion are not general obligations of the City and therefore
do not count against the City’s borrowing capacity.
Federal/State Loan and Grant Programs
The State and Federal g overnments often sponsor grant and loan programs
that municipalities may potentially use to supplement TID expenditures or
provide financing for capital costs which positively impact the district. These
programs include Wisconsin Community Development Block Grants, Rural
Development Administration Community Facility Loan/Grants, Transportation
Economic Assistance Grants, and Economic Development Administration
Grants. These programs require local match funding to e nsure State and
Federal participation in the project.
The actual amount of debt issuance will be determined by the City at its
convenience and as dictated by the nature of the projects as they are
implemented.
Plan Implementation
Projects identified will provide the necessary anticipated governmental
services to the area, and appropriate inducements to encourage development
of the area. The City anticipates making total project expenditures of
approximately $12,550,000 plus financing/interest costs to undertake the
projects listed in this Project Plan. The Expenditure Period of this District is 27
years from the date of adoption of the Creation Resolution by the Common
Council. The projects to be undertaken pursuant to this Project Plan are
expected to be financed primarily with tax increments. The City reserves the
right to alter the implementation of this Plan to accomplish this objective.
Interest rates projected are based on current market conditions. Municipal
interest rates are subject to constantly changing market conditions. In
addition, other factors such as the loss of tax-exempt status of municipal
bonds or broadening the purpose of future tax -exempt bonds would affect
market conditions. Actual interest expense will be determined once the
methods of financing have been approved and securities or other obligations
are issued.
If financing as outlined in this Plan proves unworkable, the City
reserves the right to use alternate financing solutions for the projects
as they are implemented.
Page 75 of 85
City of Fort Atkinson
TID #13 Project Plan & District Boundary
21
Section 14: Annexed Property
All lands within the TID proposed for inclusion in this amendment were either
within the City limits as of January 1, 2004, or, if annexed after that date,
have been within the City for a minimum of three years.
Section 15: Proposed Changes in Zoning Ordinances
Any changes in zoning that may take place throughout the life of the TID will
be consistent with the City’s Comprehensive Plan – Future Land Use Map.
Section 16: Proposed Changes in Master Plan, Map,
Building Codes, and City Ordinances
The City does anticipate that the TID will require changes in the master plan,
map, building codes, and City ordinances to implement this project plan. The
proposed development and uses are consistent with the a dopted Fort
Atkinson Comprehensive Plan.
Section 17: Relocation
The City does not anticipate the need to relocate persons or businesses in
conjunction with this Plan. In the event relocation or the acquisition of
property by eminent domain becomes necessary at some time during the
implementation period, the City will follow applicable state statues as
required in Wisconsin Statutes Chapter 32.
Section 18: Orderly Development of the City
The creation of the TID will enable the City to undertake projects in
furtherance of the stated objectives of its Comprehensive Plan and other
planning documents. To this extent, the creation of the TID promotes the
orderly development of the City.
Page 76 of 85
City of Fort Atkinson
TID #13 Project Plan & District Boundary
22
Section 19: A List of Estimated Non-Project Costs
Non-Project costs are public works projects that only partly benefit the TID
or are not eligible to be paid with tax increment, or costs not eligible to be
paid with Tax Incremental Financing funds. The City does not anticipate any
non-project costs for the TID.
Section 20: City Attorney Opinion
Exhibit B contains a signed opinion from the City attorney advising whether
the project plan is complete and complies with Section 66.1105(4)(f) of the
Wisconsin Statutes.
Page 77 of 85
City of Fort Atkinson
TID #13 Project Plan & District Boundary
23
Section 21: Exhibit A Cash Flow Proforma Analysis
Page 78 of 85
City of Fort Atkinson
TID #13 Project Plan & District Boundary
24
Section 22: Estimated Tax Increments By Taxing Entity
Page 79 of 85
City of Fort Atkinson
TID #13 Project Plan & District Boundary
25
Section 23: Exhibit B City Attorney Opinion
Page 80 of 85
City of Fort Atkinson
TID #13 Project Plan & District Boundary
26
Page 81 of 85
City of Fort Atkinson
TID #13 Project Plan & District Boundary
27
Section 24: Exhibit C TID #13 Boundary Legal Description
LEGAL DESCRIPTION – TID #13
LOT 7 & 8, BLK 24, DWIGHT FOSTER ET AL ADD. ALSO 16.5 FT ROW. ALSO
ESMT IN DOC 1282881., LOT 1, CSM 669-3-23 SUBJ TO 16.5FT ROW. ALSO
AGREEMENT IN DOC 1278880., LOTS 2&3, BLK 24, DWIGHT FOSTER ET AL
ADD. ALSO ESMT IN DOC 1282882., LOT 1, BLK 24, DWIGHT FOSTER ET AL
ADD. ALSO ESMT IN DOC 1089146., S43.5FT LOT 1, & W36FT LOT 2 BLK
25, DWIGHT FOSTER ET AL. ALSO ESMT IN DOC 1089145., W56FT LOT 3 &
E30FT LOT 2, BLK 25, DWIGHT FOSTER ET AL ADD. ALSO ESMT DOC
1089150., N34.5FT OF LOT 1, BLK 25, DWIGHT FOSTER ET AL ADD. SUBJ
TO ESMT IN DOC 864277. SUBJ TO ESMT IN DOC 1089147., BEG 48.5FT W
OF NE/C LOT 3, BLK 12, ORIG PLAT, W149.5FT, S132FT, E149.5FT, N132FT
TO POB., W60FT OF S21FT OF N42FT LOT 1, BLK 10, DWIGHT FOSTER ET AL
ADD., S25FT OF W80FT OF E150FT LOT 2, BLK 10, DWIGHT FOSTER ET AL
ADD., E1/2 OF LOT 5, BLK 13, ORIG. PLAT., W1/2 OF LOT 5, BLK 13, ORIG
PLAT. ALSO COM NW/C SD LOT 5 BLK 13, W33FT, S132FT, E33FT N132FT
TO POB., LOTS 3&9, BLK G, MILO JONES ADD. EX PT IN ST., S23FT LOT B &
N6INS. LOT C, BLK 15, A SUB OF LOT 1, DWIGHT FOSTER'S ADD., LOTS E &
D, BLK 15, SUB. OF LOT 1,DWIGHT FOSTER'S ADD., LOT 5, EX N24.33FT OF
W22FT, STEVENS-DAVIS ADD., LOTS 15&16, STEVENS-DAVIS ADD. EX
E50.5FT LOT 15., S68FT OF LOT 14, EX W22.42FT STEVENS-DAVIS ADD.,
BEG SW/C OF UNPLATTED LD BTN LOT 3, BLK 8, ORIG PLAT GRANT ST,
E47.83FT, N78.5FT, W47.83FT, S78.5FT TO POB. SUBJ TO & ALSO 10FT
ROW'S. SUBJ TO ENCROACHMENT IN DOC 1429957., LOT 3 & E150FT LOT
2, EX S25FT OF W80FT OF E150FT, LOT 2, BLK 10, DWIGHT FOSTER ET AL
ADD., LOT 1 & E115FT OF LOT 2, BLK 12, ORIG PLAT., W50FT OF LOT 2 &
E48.5FT OF LOT 3, BLK 12, ORIG PLAT., SURVEYED AS LOT 1, CSM 1504- 4-
592, DOC 775606. REVISED AS LOT 1, CSM 1509-5-1, DOC 775844.
REVISED AS LOT 1, CSM 1604-5-149, DOC 782982., LOT A & N2FT LOT B,
BLK 15, SUBD. OF LOT 1, DWIGHT FOSTER'S ADD., LOT 4, BLK 13, ORIG
PLAT., LOT C, BLK 15, SUBD OF LOT 1, DWIGHT FOSTER'S ADD. EX N 6 IN.,
LOTS 1&2 & N1FT OF LOT 3, STEVENS-DAVIS ADD. SUBJ TO ESMT IN DOC
1476068., LOT 13, STEVENS-DAVIS ADD., LOT 4 & N24.33FT OF W22FT OF
LOT 5, STEVENS-DAVIS ADD., E50.5FT OF LOT 15, STEVENS-DAVIS ADD.,
LOT 7, STEVENS-DAVIS ADD., LOT 9, STEVENS-DAVIS ADD., LOT H, BLK
15, SUBD. OF LOT 1,DWIGHT FOSTER'S ADD. ALSO INT IN PARTITIONS.,
BEG 74.75FT N OF SW/C BLK 15 DWIGHT FOSTER'S ADD,N18.32FT
E83FT,S18.80FT,W83FT TO POB., BEG 56FT N OF SW/C BLK 15, DWIGHT
FOSTER'S ADD,N18.75FT E83FT,S18.75FT,W83FT TO POB., BEG 41.3FT N
OF SW/C BLK 15, DWIGHT FOSTER'S ADD,N14.7FT, E83FT,S14.7FT,W83FT
TO POB., LOT M, BLK 15, SUB OF LOT 1, DWIGHT FOSTER'S ADD., BEG AT
NW/C LOT 1,BLK 17, DWIGHT FOSTER ET AL ADD,
Page 82 of 85
City of Fort Atkinson
TID #13 Project Plan & District Boundary
28
S115.5FT,E99.12FT,N115.5FT, W100.8FT TO POB., S4FT OF E100FT OF LOT
1 & T LOT 2, EX S8FT, BLK 1, JOHN MCPHERSON'S SUB., LOT 7,E 76.02 FT
LOT 8,BLK A MILO JONES ADD., LOTS 6 & 7, BLK 1, JOHN MC PHERSON'S
SUB. ALSO BEG AT SW/C SD LOT 6, W TO JANESVILLE AVE, NE TO W/L LOT
6, SELY ALG W/L SD LOT TO POB. ALSO PT RD VAC IN DOC 979263 AS
FOLLOWS: COM NW/C BLK W, CONT OF MILO JONES ADD, N22DG22'E
245.28 FT TO POB, N22DG22'E 131.51 FT, N23DG33'W 6.3FT, N05DG42 'E
68.16FT, S24DG31'W 380.49 FT, S66DG14'E 31.61FT TO POB, N1/2 OF LOT
8, BLK 1, JOHN MCPHERSON'S ADD. EX BEG NW/C LOT 8, SWLY 12.5FT,
E48.5FT, NWLY TO POB. ALSO PT LOT 1 LYG S OF LINE COM 4FT N OF NE/C
LOT 2 & RUN W TO PT N/L LOT 8, 48.5FT E OF W/L LOT 8 12.5FT S OF NW/C
THEREOF, ALL IN BLK 1 JOHN MCPHERSONS ADD., BEG 77FT E OF NW/C
BLK 10, DWIGHT FOSTER ET AL ADD, E27 FT, S42FT,W27FT,N42FT TO POB,
BEG NW/C BLK 10, DWIGHT FOSTER ET AL ADD,E77FT,S42FT
W17FT,N21FT,W60FT,N21FT- POB, E125FT OF LOT 1, BLK 11, ORIG. PLAT.,
COM 42FT S OF NW/C BLK 10, DWIGHT FOSTER ET AL ADD, E 104FT,
S43FT, W104FT, N43FT TO POB., BEG 85FT S & 90FT E OF NW/C BLK 10,
E14FT, S47FT, W14FT, N47FT TO POB., BEG 85FT S OF NW/C BLK 10,
DWIGHT FOSTER ET AL ADD, E90 FT, S47FT, W90FT, N47FT -POB, LOTS
1,2,3,4&6, BLK A, MILO JONES ADD. EX W68FT LOT 6. ALSO S38FT OF LOT
1 & S36FT LOTS 2,3&4, BLK 16, ORIG PLAT. EX N50FT OF W103.02FT OF
LOTS 3&4, BLK A, MILO JONES ADD. EX COM NW/C LOT 4, BLK A, MILO
JONES ADD, S0DG21'W 60FT TO POB, S0DG21'W 66.15FT, S89DG38'E
105FT, N0DG21'E 67.26FT, S89DG45'W 105FT TO POB., LOT 3, EX N1FT,
STEVENS-DAVIS ADD., LOT F, BLK 15, SUBD. OF LOT 1, DWIGHT FOSTER
ADD., LOT G, BLK 15, SUBD. OF LOT 1, DWIGHT FOSTER'S ADD., LOT 6,
STEVENS-DAVIS ADD. ALSO ROW, N32FT OF LOT 14 & W22.42FT OF S68FT
OF LOT 14, STEVENS-DAVIS ADD., LOT N, BLK 15, SUB OF LOT 1, DWIGHT
FOSTER'S ADD. ALSO COM 34FT W OF NW/C LOT 3,BLK 15,DWIGHT
FOSTER'S ADD,N32.5 FT,W65FT,S32.5FT,E65FT TOPOB ALSO COM NW/C
LOT O, DWIGHT FOSTER'S ADD, S00DG03'E 116.23FT, N89DG59'E 55FT,
N03DG33'W 116.23FT, S89DG59' W 55FT TO POB., LOT 8, STEVENS-DAVIS
ADD., S19.3FT LOT L, BLK 15, SUB OF LOT 1,DWIGHT FOSTER ADD., N94FT
OF LOT 1. ALSO LOT 2 EX W6FT & EX S36FT BLK 16, ORIG. PLAT., LOTS
3&4 & W6FT OF LOT 2,BLK 16,ORIG. PLAT.EX S36FT LOT 2 & EX E36FT OF
S36FT LOT 3. EX S36FT OF LOT 4 & S36FT OF W36FT OF LOT 3, BLK 16.,
BEG NE/C LOT 1, BLK 1,JOHN MCPHERSON'S SUB, S88DG30'W
43.82FT,S81DG40'W 14.81FT, SWLY ON CUR WITH CD OF S53 DG18'W
48.46FT,S24DG56'W 225.31FT,N88DG30'E 98.42FT, N01DG29'W
55.18FT,N88DG30'E 100FT,N01DG29'W 176.3FT-POB., BEG NE/C LOT 1,
BLK 17, DWIGHT FOSTER ET AL ADD,W31. 2FT,S115.5FT,E49.38FT,N115.5
FT,W16.5FT TO POB., BEG 115.5FT S OF NW/C LOT 1, BLK 17,DWIGHT
FOSTER ET AL ADD,S84.5FT,E132FT,N84.5FT, W132FT-POB., BEG 200FT S
OF NW/C LOT 1, BLK 17,DWIGHT FOSTER ET AL
Page 83 of 85
City of Fort Atkinson
TID #13 Project Plan & District Boundary
29
ADD,S51FT,E132FT,N51FT,W132 FT TO POB., E100FT OF S59FT OF LOT
1,BLK 1,JOHN MC PHERSON'S SUB. EX S4FT., S1/2 OF LOT 8, BLK 1, JOHN
MC PHERSON'S SUB. EX W5FT SOLD TO CITY IN DOC 336804. ALSO PT RD
VAC IN DOC 979263 AS FOLLOWS: COM NW/C BLK W, CONT OF MILO
JONES ADD, N22 DG22'E 376.79FT, N23DG33'W 6.3FT, N5DG42'E 84.48FT
TO POB, S67DG45'E 5.22FT, N05DG 42'E 12.52FT, N24DG56'E 42. 29FT,
N66DG41'W 5FT, S20DG48 'W 54.35FT TO POB., LOTS 4,5,6 & 7, & E10FT
LOT 3, BLK 25, DWIGHT FOSTER ET AL ADD. ALSO ESMT IN DOC 1089148.
ALSO ESMT IN DOC 1089149. ALSO ESMT IN DOC 1089150., LOT 1, CSM
4437-22-181. ALSO AFFIDAVIT IN DOC 1134035. ALSO AFFIDAVIT IN
1188233., COM WLY EXT OF N/L OF S 3RD ST, 94FT SELY OF C/L CNW RR
ROW, NELY 178.6FT TO POB, NELY 96.4FT, NWLY 70FT TO A PT 9FT SELY OF
SPUR TRACK ICC #28, SWLY 96.4FT, SELY 75FT TO POB., BEG 94FT SE OF
C/L RR &32FT NELY OF N/L S THIRD ST,NELY 134FT,NWLY
75FT,SWLY134FT,SE TO POB.EX LD IN ST. 482-355., LOT 8 & E1/2 OF LOT
7, BLK 13, ORIG. PLAT., LOT 3, BLK 13, ORIG PLAT. ALSO GARAGE ESMT IN
DOC 939554. EX S48FT OF E38FT., LOT 2, BLK 8, ORIG PLAT. EX BEG SE/C
SD LOT, N52.5FT, W31FT 8IN, N TO RIV, E TO E/L LOT 2, S TO POB. EX
W37FT OF S74FT LOT 2, BLK 8, ORIG PLAT. ALSO E33FT OF LOT 3, BLK 8,
ORIG PLAT. ALSO ESMT IN DOC 1089144. SUBJ TO ESMT. SUBJ TO ESMT IN
DOC 1506269., LOT 3, BLK 8, ORIG PLAT. EX E33FT. EX ESMT BEG 140FT N
SE/C, W TO PT 160FT N OF SW/C. ALSO BEG INT E/L GRANT ST & N/L S
WATER ST, E47.83 FT TO POB, ELY TO W/L LOT 3, BLK 8, ORIG PLAC, N ALG
W/L TO RIV, W ALG RIV TO E/L GRANT ST, S TO PT 78.50FT N OF N/L S
WATER ST, E47.83FT, S78.5FT TO POB. SUBJ TO ROW & ESMT. ALSO E1/2
GRANT ST VAC IN DOC 1040706. ALSO E1/2 VAC GRANT ST VAC IN DOC
1125779. EX COM SE/C CSM 4437-22-181, DOC 1125405, N71.75 TO POB,
N22DG52'E 80 .4FT, NWLY 33.2FT TO NE/C SD LOT 2, S86.94FT TO POB.,
BEG 52.5FT N OF SE/C LOT 1, BLK 8, ORIG PLAT,W85FT,N TO ROCK
RIV,E85FT,S TO POB.ALSO BEG 52.5FT N OF SE/C LOT 2 BLK 8, W31.8FT, N
TO RIV,ELY TO E/L LOT 2, S TO POB. ALSO 1/3 INT IN ROW OVER E15FT OF
LOT 2,BLK 8, ORIG PLAT. ALSO ESMT IN DOC 1331116 & 1331117. SUBJ TO
ESMT IN DOC 1370408. ALSO ESMT IN DOC 1506269., N22.5FT OF S52.5FT
OF LOT 1, BLK 8. ALSO 1/3 INT IN ROW OVER E15FT OF LOT 2, BLK 8, ORIG
PLAT. ALSO ESMT IN DOC 1331116 & 1331117. ALSO ESMT IN DOC
1506269., E1/2 OF LOT 6 & W1/2 OF LOT 7, BLK 13, ORIG. PLAT., LOT 3,
BLK 9, DWIGHT FOSTER ET AL ADD., LOT 1, BLK 9, DWIGHT FOSTER ET AL
ADD. PROP ASSESSED BY TELCO MFG, LOT 2, BLK 9, DWIGHT FOSTER ET
AL ADD.
Page 84 of 85
City of Fort Atkinson
TID #13 Project Plan & District Boundary
30
Section 25: Disclaimer Text
Robert W. Baird & Co. Incorporated is providing this information to you for
discussion purposes. The materials do not contemplate or relate to a future
issuance of municipal securities. Baird is not recommending that you take
any action, and this informa tion is not intended to be regarded as “advice”
within the meaning of Section 15B of the Securities Exchange Act of 1934 or
the rules thereunder.
Page 85 of 85
Source: City of Fort Atkinson website. First collected Oct 8, 2026.