Please note, these are draft minutes and may be amended until approved by the Common Council.
CITY OF CHIPPEWA FALLS
BOARD OF PUBLIC WORKS
MEETING MINUTES
MONDAY, JUNE 22, 2026 – 5:30 PM
The Board of Public Works met in City Hall on June 22, 2026 at 5:30 pm. Attending were
Mayor Jason Hiess, Vice-President Tom Hubbard, Director of Public Works Brandon Cesafsky,
Alderman Tim Normand, and Mike Tzanakis. Also attending was Paul Holzinger of CDPG.
1. Motion by Hubbard, seconded by Normand to approve the minutes of the June 8, 2026
Board of Public Works meeting. All present voting aye. MOTION CARRIED.
2. Cesafsky provided the background on the appointment of a professional engineer with
background in groundwater to the Groundwater Technical Review Committee which
handles requests to place certain business uses within the City’s wellhead protection area.
City Planner Hentschel has coordinated with SEH who recommended Veronica Aranda
for the appointment. Cesafsky explained that the appointment needs to be made by the
Board of Public Works and that the contract for SEH’s services will be coming to
committee in the future. Mayor Hiess asked about a representative from the county and
Cesafsky explained that City Planner Hentschel is also working with the County on that
appointment.
Motion by Cesafsky, seconded by Hubbard to appoint Veronica Aranda to the
Groundwater Technical Review Committee. All present voting aye. MOTION
CARRIED.
3. Cesafsky provided the background on the development agreement for Summit Ridge
Phase 1 development with CDPG. Cesafsky stated that the agreement has been modified
from prior agreements which includes changes to the as built requirements, televising
requirements, pond maintenance, and building permits. Mayor Hiess had some
corrections to the document which Cesafsky said he would change. Mayor Hiess also
asked if this had gone before the City Attorney to which Cesafsky replied that it had.
Motion by Hiess, seconded by Hubbard to recommend Common Council approve the
development agreement with CDPG for phase 1 of the Summit Ridge Development. All
present voting aye. MOTION CARRIED.
4. Cesafsky provided the background on STH 178 and maintenance responsibilities stating
that the City turned over maintenance responsibility to the State in 2007 with the
Jurisdictional Transfer agreement. Cesafsky stated that since that time the Old Abe State
Trail has been plowed by the City but there is not any documentation outlining who has
maintenance of the trail. Cesafsky stated that through another request, he learned about
the DT1504 application which can be used to document City infrastructure within the
State right-of-way which he felt was a good way to get the maintenance on this trail
ironed out. Cesafsky stated that the goal is to inventory all City bike trails and that this
application is a good step in cleaning up some of the confusion around State/City
Board of Public Works Meeting Minutes
June 22, 2026
Page 2
Please note, these are draft minutes and may be amended until approved by the Common Council.
maintenance on the trail. Cesafsky stated that the fence along the trail will be the City’s
responsibility as well and that we will work to get that fixed once this is complete.
Motion by Tzanakis, seconded by Hubbard to recommend Common Council authorize
Cesafsky to execute the application with the State which will clear up the maintenance
responsibility of the Old Abe State Trail within the City Limits. All present voting aye.
MOTION CARRIED.
5. Adjournment
Motion by Hubbard, seconded by Normand to adjourn. All present voting aye.
MOTION CARRIED. The Board of Public Works meeting adjourned at 6:19 pm.
Brandon Cesafsky
Secretary, Board of Public Works
Please note, these are draft minutes and may be amended until approved by the Common Council.
CITY OF CHIPPEWA FALLS
BOARD OF PUBLIC WORKS
MEETING MINUTES
MONDAY, JUNE 8, 2026 – 5:30 PM
The Board of Public Works met in City Hall on June 8, 2026 at 5:30 pm. Attending were
Mayor Jason Hiess, Director of Public Works Brandon Cesafsky, Alderman Tim Normand,
Mike Tzanakis. Absent was Vice-President Tom Hubbard. Also attending was Mark Bassett with
Happy Tails Dog Park.
1. Motion by Normand, seconded by Tzanakis to approve the minutes of the May 11, 2026
Board of Public Works meeting. All present voting aye. MOTION CARRIED.
2. Cesafsky provided the background on the Happy Tails Dog Park agreement stating it is
very similar to the prior agreement with some minor changes to the mowing and pool use
sections. Mark Bassett confirmed that this is a 5-year agreement with an autorenewal
after 5 years. Mayor Hiess stated he would like the City attorney to review the agreement.
Motion by Cesafsky, seconded by Normand to recommend Common Council approve
and execute the agreement with Happy Tails Dog Park for a 5-year term with auto renew
after 5 years after it has been reviewed and approved by the City Attorney. All present
voting aye. MOTION CARRIED.
3. Cesafsky provided the background on the 2025 Compliance Maintenance Annual Report
(CMAR) stating that he filled out the report and that the governing body must review and
approve the report with a resolution. After the resolution is approved the report will be
finalized and submitted to the DNR.
Motion by Tzanakis, seconded by Normand to recommend Common Council approve
the 2025 CMAR report and resolution. All present voting aye. MOTION CARRIED.
4. Adjournment
Motion by Normand, seconded by Tzanakis to adjourn. All present voting aye.
MOTION CARRIED. The Board of Public Works meeting adjourned at 5:46 pm.
Brandon Cesafsky
Secretary, Board of Public Works
Veronica Aranda, Professional Geologist – Environmental Scientist – page 1
VERONICA ARANDA, PROFESSIONAL
GEOLOGIST
ENVIRONMENTAL SCIENTIST
Veronica Aranda is an Environmental Scientist for SEH’s Environmental Practice Center with
experience in solid waste, gas compliance, groundwater monitoring, remedial excavation,
and environmental site assessments in a variety of contamination types including petroleum
sites, hazardous waste sites, solid waste sites and mine sites. She also
monitors groundwater for contamination during active life and post-closure life at various
landfills and other sites. Responsibilities in landfill monitoring include sampling and analyzing
data from groundwater, private wells, process water and leachate to determine environmental
conditions. She is involved with subcontractor oversight in subsurface investigations including
contaminated soil excavation, drilling, and the installation of monitoring wells.
Veronica’s experience includes using a GEM5000 landfill gas analyzer, TVA PID/ ID volatile
organic vapor, pH meter, specific conductivity meter, groundwater bladder pumps, peristaltic
pumps, Waterra groundwater pumps and ES-60 groundwater pumps. Veronica is involved in
the development and implementation of soil and groundwater sampling and analysis
programs. Veronica meets the education requirements for a registered Professional Geologist
(PG) in the state of Wisconsin define in Chs. NR 500 and 700 series of the Wisconsin
Administrative Code.
EXPERIENCE
OF EXPERIENCE
EDUCATION
Bachelor of Science
Geology
University of Wisconsin-Eau Claire
(2018)
CONTINUING EDUCATION
Municipal Engineering Program, UW-
Madison Extension (2021)
REGISTRATIONS/CERTIFICATIONS
Professional Geologist in WI (#2019-13)
(2025-present)
Tank System Site Assessor (2022-
present), Wisconsin Department of
Agriculture, Trade and Consumer
Protection
Asbestos Certified Inspector (#AII-
288685) (2022-present)
OSHA 40-Hour HAZWOPER (2021-
present)
Mine Safety Health Administration
(MSHA) – Metal/Nonmetal Mine (2018-
present)
• 2025-2026 NR 700 Site Investigation (Former Chetek Water Tower) – Chetek, WI
• 2024
NR 700 Site Investigation (Price County Highway Department) – Price
County, WI
• 2023-2025 NR 700 Site Investigation (City of Rice Lake Waste Oil Tank
Abovegr
ound Storage Tank) – Rice Lake, WI
• 2022-Present NR 700 Site Investigation (Midwest Manufacturing Menards) – Eau
Claire,
WI
• 2022-2024 NR 700 Site Investigation (Grassland Dairy Products, Inc) – Greenfield,
WI
• 2024 NR
500 Conditional Closure Plan Approval Modification (City of Rice Lake
East
Landfill) – Rice Lake, WI
• 2023 NR
500 Conditional Closure Plan Approval Modification (City of Ladysmith
Landfill) – Ladysmith, WI
• Phase II
Site Investigation (Former Oil Bulk Plant) – Winter, Wisconsin
• Phas
e II ESA 15785 US63 (Sawyer County) – Sawyer County, WI
• 2025 Perrenoud Environmental Monitoring and Reporting (WDNR) – Chippewa
Falls, WI
• Phase I ESA 15785 US63 (Sawyer County) – Sawyer County, WI
• Phase I ESA 421 S Green Ave – New Richmond, WI
• 2025 Annual Groundwater Sampling and Biennial Soil Sampling (Stresau
Laboratory
Inc) – Spooner, WI
• Phase 1 ESA Thrivent Ballard Campus Farmland (Thrivent Financial For
Lutherans)
– Appleton, WI
• Site Investigation Phase II (Stresau Laboratory Inc) – Spooner, WI
• Phase I ESA Former Beebe Building Property (New Richmond Partners Downtown,
LLC) – New Richmond, WI
• Sampling technician for landfill gas system O&M and groundwater, private well,
and /or
gas monitoring and compliance reporting at approximately thirty (30)
l
andfills across Wisconsin
1
PUBLIC INFRASTRUCTURE DEVELOPMENT AGREEMENT
THIS PUBLIC INFRASTRUCTURE DEVELOPMENT AGREEMENT ("Agreement") is
made this ____ day of ________, 2026, between the City of Chippewa Falls, a Wisconsin municipal
corporation ("City"), and CDPG Developers , LLC, a Wisconsin limited liability company
("Developer"). City and Developer may be referred to individually as a “Party” or collectively as
the “Parties”.
WITNESSETH THAT, the Parties hereto recite and agree as follow s:
ARTICLE 1 – GENERAL CONDITIONS
Section 1.1 Background. Developer wishes to enter into an agreement with the City
where Developer w ill apply to have the Property, as hereinafter defined, subdivided and will thereafter
cause the construction and installation of certain Public Improvements as outlined in this Agreement.
(the “Development”).
Section 1.2 The Property. The Property which shall be improved is l Located in the
Southwest quarter of the Northwest quarter of Section 9, Township 28 North, Range 8 West, City of
Chippewa Falls, Chippewa County, Wisconsin and also is located in the Northwest quarter of the
Northwest quarter and the Southwest quarter of the Northwest quarter of Section 9, Township 28 North,
Range 8 West, City of Chippewa Falls, Chippewa County, Wisconsin, and also is located in the
Northwest quarter of the Northwest quarter of Section 9, Township 28 North, Range 8 West, City of
Chippewa Falls, Chippewa County, Wisconsin. City of Chippewa Falls, Chippewa County, WI, on
Chippewa County Parcel Nos. 22808-0923-0020000, 22808 -0921-71387001, 22808 -0924-05250000,
and 22808-0922-0002000, as more particularly described on the Summit Ridge Plat attached hereto as
Exhibit “A” (collectively the "Property"). The Project Plans for the development are attached hereto
as Exhibit “B”.
Section 1.3 Public Improvements. Developer request s, at its expense, to be allowed to
prepare plans and specifications and to award contracts to construct the utilities, streets, water, sewer,
and any other improvements necessary to serve the Development (the "Public Improvements"). A
description of the Public Improvements is attached as Exhibit "C ." City is willing to allow Developer
to construct and install the Public Improvements only if the conditions set forth in th is Agreement
are satisfied.
Section 1.4 Public Improvements, Plans, and Specifications, and Compliance . City
agrees authorizes its City Engineer to review and approve the plans and specifications prepared by
Developer for the Public Improvements (the "Pl ans and Specifications"). All street, utility, sanitary,
storm, and water infrastructure will conform to City's Standard Construction Specifications and
comply with all applicable laws, ordinances, and regulations. Approval of the Plans and Specifications
for the Public Improvements is a condition of this Agreement.
Section 1.5 Public Improvements, Warranty. Developer agrees the Public
Improvements will be constructed in a workmanlike manner and free from any defect due to faulty
materials or workmanship ; all materials and labor for the Public Improvements will be in strict
conformity to the Plans and Specifications and any other requirements reasonably set forth by City. All
2
work done pursuant to this Agreement is subject to the inspection and approval o f the City Engineer,
who will have the authority to suspend or stop work on the Public Improvements if any condition of
this Agreement is breached or any law or administrative rule is violated, and such breach or violation
is not cured or remedied to the satisfaction of the City Engineer after the City Engineer provides written
notice of same to Developer.
If any material or labor that is supplied for the Public Improvements is rejected by the City Engineer
as defective or unsuitable, then the rejected ma terials must be removed and replaced with approved
material, and the rejected labor will be redone to the reasonable satisfaction and approval of the City
Engineer at the sole cost and expense of Developer. This warranty will extend for one year beyond the
final acceptance of the Public Improvements by City. City agrees that acceptance of the Public
Improvements will not be unreasonably delayed or withheld.
ARTICLE 2 – DEVELOPER’S REPRESENTATIONS
Developer represents to City that as of the date of this Agreement, the statements set forth in
this section are true.
Section 2.1 No Disability. Developer knows of no legal disability that would prevent it
from carrying out this Agreement.
Section 2.2 Execution. The execution, delivery and performance of this Agreement do es
not and will not result in any breach of, or constitute a default under, any indenture, mortgage, contract
agreement or instrument to which Developer is a party.
Section 2.3 Litigation. There are no pending or, to the knowledge of Developer,
threatened actions or proceedings before any court or administrative agency which will materially
adversely affect the financial condition, business or operation of Developer.
Section 2.4 Compliance. Developer will comply with and promptly perform its
obligations under this Agreement and all related documents and instruments.
ARTICLE 3 - PUBLIC IMPROVEMENT SCHEDULE AND DEDICATION OF PUBLIC
IMPROVEMENTS
Developer will install the Public Improvements in accord ance with the provisions in Artic le
3.
Section 3.1 Final Plat Approval. Provided that Developer is in compliance with this
Agreement, City will approve the final Summit Ridge Plat in advance of acceptance of the Public
Improvements within that Plat.
Section 3.2 Contracts for Work. Any contract awarded by Developer for work on the
Public Improvements must contain the following provision:
(a) Failure to Perform. Developer may, by written notice to the contractor,
immediately terminate the contract in th e following circumstance: Failure to make satisfactory
progress toward completion of the work in accordance with the Plans and Specifications after
contractor has been given three (3) notices by Developer and contractor has failed in each case to
3
make satisfactory progress toward completion of the work within seventy -two (72) hours of such
notice.
Section 3.3 Dedication of Public Improvements. The Public Improvements will be
dedicated to the public upon acceptance of the completed work by the City Engineer. Prior to acceptance,
a full set of as -builts shall be submitted to and approved by the City Engineer. As -builts shall include,
at a minimum, the information outlined in Section 3.3.1 . Developers will be deemed to have no right,
title or interest in or up on any element of the dedicated Public Improvements . A breakdown of the
utilities being installed and their estimated cost and whether the utility will be public or private is
attached hereto as Exhibit “ C” and is incorporated herein by reference .
Section 3.3.1 As-built Information . As-builts shall be submitted in both PDF and dwg
format. As -builts shall include , but not be limited to , the following information set
forth below . Any deviations from the approved plan set shall be noted in red on the
plan set and also be included in the AutoCAD .dwg file.
a. Water
1. Depth of main at every junction
2. Depth of main at every lateral
3. Depth and GPS location of every lateral terminus
4. Hydrant Depth
5. Lineal footage of pipe between fittings
6. Location, depth, and Description for all fittings
b. Wastewater Sewer
1. Depth of main at every junction
2. Slope of main between every junction.
3. Manhole invert elevations at all inlets and outlets.
4. Elevation, depth, and GPS location of every lateral term inus
5. Lineal footage of pipe between junctions
c. Storm Sewer
1. Depth of main at every junction
2. Slope of main between every junction.
3. Manhole invert elevations at all inlets and outlets.
4. Elevation, depth, and GPS location of every lateral terminus
5. Lineal footage of pipe between junctions
d. General
1. GPS Location of all property irons.
Section 3.3.2 Televising of Sewers Prior to dedication, developer must televise all
sanitary and stormwater mains over 6”. Videos shall be provided to the City Engineer,
reviewed, and approved prior to dedication. Any repair work resulting from work
defects shall be fixed by the developer, at the cost of the developer, prior to dedication.
Section 3.4 Dedication of Stormwater Ponds. The stormwater ponds approved in the
stormwater management plan for the first phase of the development shall be dedicated to the public
when 75% of the lots have an active water meter and have also closed out their stormwater permit. The
Developer shall be responsible for maintaining the stormwater ponds until they have been dedicated to
the City. Prior to dedication, the City Engineer shall inspect and ensure ponds conform to the pond
design criteria outlined in the stormwater management plan.
4
Section 3.5 Lien Waiver. Developer shall present to the City , valid lien waivers from
the general contractor for all persons providing materials or performing work on City certified
improvements. Certification by the City Engineer does not constitute a waiver by t he City of the
right to pursue its default remedies for defects in or failure of any improvements that are detected
or which occur following such certification.
ARTICLE 4 - SECURITY
Section 4.1 Security for Cost of Public Improvements. Prior to commencing work on
the Public Improvements, Developer shall provide to City a performance bond or irrevocable letter
of credit, with terms and conditions satisfactory to City, in the sum of not l ess than one hundred
twenty percent (1 20%) of the e stimated cost of the Public Improvements. The performance bond or
irrevocable letter of credit is a guaranty to the City that the Public Improvements will be timely
completed. The performance bond or irrevocable letter of credit will be maintained continuo usly by
Developer until final acceptance and dedication of the Public Improvements by City. The
performance bond or irrevocable letter of credit shall be released by City upon certification by the
City Engineer the Public Improvements are accepted pursuant to this Agreement. Periodically, as
payments are made by Developer for the completion of the Public Improvements, Developer may
request the City reduce the amount of the performance bond or irrevocable letter of credit on a pro-
rata basis.
The performance bond or irrevocable letter of credit will provide that City may draw upon it
for the full-face amount of the cost of curing any default of Developer hereunder after City has
provided written notice to Developer describing the default and Developer has not cured such default
within thirty (30) days of receipt of such notice.
ARTICLE 5 - DEVELOPER'S RESPONSIBILITY
Section 5.1 Easements. Developer will execute and deliver to City upon request and
without charge, permanent easements for the location, construction, installation, operation, and
maintenance of the Public Improvements . Any easements and deeds shall be in form and content
satisfactory to City.
Section 5.2 Inspection. Developer shall instruct its engineer to provide adequate field
inspection personnel to assure an acceptable level of quality control of the Public Improvements .
Inspections shall conform to Section 3.3.1 .
Developer shall pay City for engineering and construction observation of the Public
Improvements performed by the City Engineer. Such engineering will include monitoring of
construction, consultation with Developer and its engineer on status or problems regarding the work,
coordination for final inspection and acceptance, project monitoring during the warranty period, and
processing of request for reduction in security.
Section 5.3 Engineering Data. Developer, through its engineer, must provide all staking,
surveying and other information required by the City Engineer, to assist the City Engineer in carrying
5
out the City Engineer's duties under this Agreement in order to ensure that the Public Improvements
conform to the Plans and Specifications.
Section 5.4 Erosion Control Measures During Construction. Developer and Developer's
contractors shall comply with Chapter 30 (Construction Site Erosion Control) of City of Chippew a
Falls Code of Ordinances in regard to construction of the Public Improvements .
Section 5.5 City Regulations. Developer acknowledges the Property is subject to
regulation by City and that a default under applicable City ordinances or failure to meet or perform
any condition of approval of any permit applicable to the Public Improvements shal l be a default
hereunder. The following conditions must be fulfilled to the satisfaction of the City Engineer before
construction of the Public Improvements begin. The requirement of any condition may be waived by
the Common Council of the City if adequate assurances of compliance are provided by Developer .
(a) Developer shall obtain and comply with a stormwater plan s approved
by the City Engineer for the Development.
(b) The Development shall be constructed according to any applicable
Conditional Use Permit and all conditions imposed upon final Plat approval.
(c) City shall review and approve a grading plan, utilities plan, sidewalk
and trail plan, driveway plan and phase plan for the Development. A copy of the proposed
specifications is attached hereto as Exhibit “ D”.
(d) For purposes of snow management, the Developer shall be responsible
for all snow removal operations throughout the snow season until the development right -of-way has
been dedicated to the City.
(e) Developer shall obtain all r equired permits from local and state
regulatory bodies . City issued building permits shall not be issued until finished gravel grade is
reached for all of the phase 1 streets .
Section 5.6 Damage to City or County Facilities. Developer will be responsible for any
damage caused to any City facilities or improvements including roads, stormwater systems, sewer and
water facilities whether done by Developer, its contractors, agents , or employees and for any repair or
clean-up costs or expenses incurred by City or Chippewa County in taking remedial action as a result
of such damage.
Section 5.7 Repair Obligations. Developer shall be responsible for any and all repair
and replacement costs of pavement which is disturbed or damaged by Developer while repairing or
replacing utilities.
Section 5.8 Streetlights. Developer shall install streetlights in the Development in
accordance with the street light plan in the plans . The specifications and location of said lighting shall
be approved by the City prior to installation and shall become the responsibility of the City upon
public dedication of the roadway. Street lights shall be spaced as seen on the plans , shall be Type C
150W Cobra heads on 30ft wooden poles .
ARTICLE 6 - INSURANCE
6
Section 6.1 Insurance. Developer and its contractors will provide and maintain or cause
to be maintained at all times during the process of constructing the Public Improvements and, from time
to time at the request of City, furnish City with proof of payment of premiums on:
(a) Comprehensive general liability insurance (including operations,
contingent liability, operations of subcontractors, completed operations and contractual liability
insurance) together with an Owner's Contractor's policy with limits against bodily injury and p roperty
damage of not less than $1,000,000 for each occurrence (to accomplish the above required limits, an
umbrella excess liability policy may be used), and will be endorsed to show City as an additional
insured to the extent of its interest ,
(b) Comprehensive general public liability insurance, including personal
injury liability for injuries to persons and/or property, including any injuries resulting from the
operation of automobiles or other motorized vehicles involved in work on the Public Improvements,
in the minimum amount for each occurrence of $1,000,000, and will be endorsed to show City as an
additional insured to the extent of its interest,
(c) Worker's Compensation insurance respecting all employees in amounts
not less than the minimum required by sta tute.
ARTICLE 7 - INDEMNIFICATION
Section 7.1 Indemnification. Developer agrees to indemnify, defend and hold City, and
its officials, employees, and agents, harmless against any and all claims, demands, lawsuits,
judgments, damages, penalties, costs and e xpenses arising out of actions or omissions by Developer,
its employees and agents, in connection with the Public Improvements.
Section 7.2 Enforcement by City; Damages. Developer acknowledges the right of City
to enforce the terms of this Agreement against Developer, by action for specific performance or
damages, or both. Developer acknowledges its failure to perform any or all of its obligations under
this Agreement may result in damages to City; that in the event of default hereunder by Developer,
City may commence legal action to recover all damages, losses and expenses sustained by City
associated with the enforcement of this Agreement.
ARTICLE 8 – EVENTS OF DEFAULT
Section 8.1 The following will be "Events of Default" under this Agreement and the term
"Event of Default” will mean, whenever it is used in this Agreement, any one or more of the following
events:
(a) Failure of Developer to commence or complete construct ion of the
Public Improvements pursuant to the terms, conditions, and limitations of this Agreement after City has
provided written notice to Developer describing the failure and Developer has not cured such failure
within thirty (30) days of receipt of su ch notice.
(b) Failure of Developer to observe or perform any covenant, condition,
obligation, or agreement on its part to be observed or performed under this Agreement after City has
provided written notice to Developer describing the failure and Develope r has not cured such failure
within thirty (30) days of receipt of such notice.
7
Section 8.2 Remedies on Default. Whenever any "Event of Default" occurs, City may
take any one or more of the following actions:
(a) Suspend work on the Public Improvement until it receives assurances
from Developer they will cure its default and continue its performance under this Agreement.
(b) Take action, including legal or administrative action, as is necessary for
City to secure performance of any provision of this Agreement or recover any amounts due under this
Agreement from Developer or under the performance bond described in Section 4.1.
(c) Undertake to complete the Public Improvements itself, through its
agents or through independent contractors and before the undertaking, draw upon the performance
bond described in Section 4.1 for the full amount of the estimated work.
ARTICLE 9 - ADMINISTRATIVE PROVISIONS
Section 9.1 Notices. All Notices, certificates or other communications required to be
given to City and Developers must be sufficiently given and will be deemed given when delivered, or
when deposited in the United States mail in certified form with postage fully prepaid and addressed
with return receipt requested, as follows:
City and Developer by notice given to the other, m ay designate different addresses to which
subsequent notice, certificates or other communications will be sent.
If to City: Director of Public Works
30 West Central Street
Chippewa Falls, WI 54729
If to Developer: CDPG Developers, LLC
1750 Business Hwy 51
Chippewa Falls, WI 54703
ARTICLE 10 - ADDITIONAL PROVISIONS
Section 10.1 Titles of Sections. Any titles of the several parts of this Agreement are
inserted for convenience of reference only and will be disregarded in construing or interpreting any of
its provisions.
Section 10.2 Counterparts. This Agreement may be executed in any number of
counterparts, each of which will constitute one and the same instrument.
Section 10.3 Modification. If Developer is requested by the holder of a mortgage on the
Property or by a prospective holder of a prospective mortgage on the Property to amend or supplement
this Agreement in any manner whatsoever, City will, in good faith, consider the request, provided that
the request is consistent with the terms and conditi ons of this Agreement.
Section 10.4 Law Governing. This Agreement will be governed by and construed in
accordance with the laws of the State of Wisconsin.
8
Section 10.5 Severability. In the event any provision of this Agreement is held invalid or
unenforceable by any court of competent jurisdiction, holding will not validate or render unenforceable
any other provisions.
Section 10.6 Assignment. Developer may not assign this Agreement without prior
written consent of City, which consent shall not be unreasonably withheld or delayed.
Section 10.7 Recording. This Agreement, or a memorandum thereof executed by the
Parties, may be recorded in the office of the Register of Deeds for Chippewa County, Wisconsin, and
will be enforceable against all owners of the Property and their successors and assigns.
Section 10.8 No Vested Rights Granted . Except as provided by law or otherwise in this
Agreement, no vested rights in connection with this proj ect shall inure to the Developer. The City does
not warrant that the Developer is entitled to any other approvals required.
Section 10.9 No Waiver. No waiver of any provision of this Agreement shall be deemed
or constitute a waiver of any other provi sion, nor will it be deemed or constitute a continuing waiver
unless expressly provided for by a written amendment to this Agreement signed by both City and
Developer, nor shall the waiver of any default under this Agreement be deemed a waiver of any
subsequent default or defaults of the same type. The City's failure to exercise any right under this
Agreement shall not constitute the approval of any wrongful act by the Developer or the acceptance of
any improvements.
Section 10.10 Immunities and Special As sessment/Charges. Nothing contained in this
Agreement constitutes a waiver or limitation of the City's immunities , power, or authority under
applicable law including, but not limited to, special assessments and special charges .
Section 10.11 Ownership Warranty. Developer hereby warrants to lawful ownership and
being now lawfully seized and possessed of the real estate to be improved pursuant to this Agreement,
other than any real estate located in public rights of way.
Section 10.12 Building Permit. The City may deny issuance of a building permit until
compliance with the provisions of this Agreement and the Municipal Code of the City are met. In the
event the City issues a building permit prior to substantial completion of the Public Impr ovements,
Developer acknowledges and agrees to the following, and will ensure any contractor or subcontractor
of Developer also acknowledges and agrees to the following :
(a) Indemnification. Developer agrees to indemnify, defend, and hold harmless
the City, and its officials, employees, and agents, from any and all claims, actions, demands,
judgments, penalties, fines, liabilities, and expenses (including attorneys’ fees and court costs) ,
arising out of or in any way related to : (i) the issuance of any building permits or construction
activities within the Property, including any such claim, action, demand or judgment premised
upon the negligence of the City or any of its officers, agents, servants, or employees, and/or
for non-issuance of any occupancy permits prior to acceptance of the P ublic Improvements;
(ii) any fire, explosion, flood, or other casualty occurring on or affecting the Property during
the construction period, including any spread of such casualty to adjacent propert ies; and (iii)
any other injury to or death of any person or damage to property arising from the construction
activities.
9
(b) Occupancy . Occupancy of any improvements on the Property cannot occur
until occupancy permits are issued, and no occupancy permits wi ll be issued prior to
completion, inspection, and dedication of all required Public Improvements.
(c) Acknowledgement of Risk . Developer acknowledges, understands, and
agrees that commencement of construction activities prior to completion of the Public
Improvements creates additional risk of injury to person and property and agrees the City bears
no responsibility or liability for any loss, damage, or injury resulting therefrom and Developer
assumes all such risks . Such increased risks may include, but are n ot limited to: fire risk due to
inadequate water supply (in the event of a fire, the City’s fire department may have limited or
no ability to suppress such fire); inability to remove snow or ice during winter months and a
further inability for City emergen cy vehicles to reach the improvement; incomplete drainage,
grading, or utility infrastructure may result in flooding, erosion, settlement, or other damage to
structures of improvements constructed on the Property; and other unforeseen risks which may
arise.
(d) Additional Agreement . The City may first demand Developer to execute
such agreements and acknowledgments as it deems necessary prior to the early issuance of any
building permit(s).
ARTICLE 11 - TERMINATION OF AGREEMENT
Section 11.1 Termination. This Agreement will terminate at the time all of Developer's
obligations hereunder have been fulfilled and when the cost of the Public Improvements have been
paid in full and any default of Developer has been cured, or one (1) year after acceptance of the Public
Improvements by City, whichever occurs later. Upon request of Developer, City shall provide
Developer with resolution of acceptance that shall serve as evidence that Developer has completed its
obligations hereunder.
SIGNATURES ON FOLLOWING PAGE
10
IN WITNESS WHEREOF, City has caused this Agreement to be executed in its corporate
name by its duly authorized officers and sealed with its corporate seal; and Developer has executed
this Agreement at Chippewa Falls, Wisconsin, on the day and year first a bove written.
CITY OF CHIPPEWA FALLS, a Wisconsin municipal corporation
By: Jason Hiess, Mayor
By: Bridget Givens, Clerk
STATE OF WISCONSIN )
) ss.
COUNTY OF CHIPPEWA )
Personally, came before me this day of ___________ , 2026, the above -named
Jason Hiess, Mayor and Bridget Givens, Clerk, of the City of Chippewa Falls, to me known to
be the persons and officers who executed the foregoing instrument and acknowledged that
they executed the same as such officers by the authority of the City of Chippewa Falls.
Notary Public, State of Wisconsin
My Commission Expires ______________
11
CDPG Developers, LLC , a Wisconsin limited liability company
By: ______________________________
CDPG Developers, LLC:
Its:
STATE OF WISCONSIN )
) ss.
COUNTY OF )
Personally, came before me this day of ___________, 2026, the above-
named CDPG Developers, LLC , to me known to be the person who executed the foregoing
instrument for Developer, by the authority of said company.
Notary Public, State of Wisconsin
My Commission Expires ______________
12
List of Exhibits
Exhibit A – Summit Ridge Phase 1 Final Plat
Exhibit B – Summit Ridge Construction Plan Set Dated 02/24/ 2026 with 6/15/2026 Revisions.
Exhibit C – Description and Cost Estimate for Public Improvements
Exhibit D – 2025 City of Chippewa Falls Specifications
C O R P O R A T I O N● ●
C O R P O R A T I O N● ●
·······
R
C O R P O R A T I O N● ●
WATER MAININSULATIONOVER WATER MAINALL INSULATION SHALL BE CENTEREDNOTE:
INSULATIONMINIMUM 2"GRANULAR FILL6" COMPACTEDWATER
LOWER WATER MAIN
CENTERLINE4' EACH WAY FROM THE WATER MAINMINIMUM 2" INSULATION EXTENDING
RETAINER GLANDSMECHANICAL TYPE WITHALL JOINTS SHALL BENOTE:
SEWERBACKFILLMECH. COMPACTED
2"6" 2' MIN.BENDBEND
BEND (S)
BLOCKING DETAILTYPICAL THRUST
HYDRANT VALVEUNDISTURBEDTRENCH WALL
TRENCH WALLUNDISTURBED
HYDRANT
SEE WATER MAIN TECHNICALSPECIFICATIONS FOR THRUSTBLOCK SIZING.NOTE
& BOX INSTALLATIONTYPICAL GATE VALVE
1/4" BELOW ADJACENT BITUMINOUSSURFACING, FLUSH WITH CONCRETECURB & GUTTER
VALVE BOX ASSEMBLY
2-INCH OPERATING NUT (OPEN LEFT)PIPE SIZE VARIESCONCRETE BLOCK
MINIMUM 8.0' COVEROR AS SPECIFIED ON PLANS
SERVICE CONNECTIONWATER
PROPOSED FINISHED GRADECONCRETE CURB AND GUTTER
LAY NEW SERVICE ONE PRE-CASTMANHOLE BLOCKWATER SERVICEWITH HORIZONTAL LOOPSTO PROVIDE FOR SETTLEMENTWATER MAIN
SERVICE BOX
4' TYP.
ELEVATION
PROPERTY LINE
MIN. 8' COVER
PROPERTY LINE
TO PROPERTY LINE
NOTE:TRACER WIRE REQ'D WHENUSING PVC WATER PIPE30-INCH TYPE "D"
CONNECT TO EXISTING WATERSERVICE USING ENGINEER APPROVEDCONNECTION.FOR STUBBED SERVICE, PLUG WITHAY MCDONALD 74753Q ADAPTOR(OR ENGINEER APPROVED EQUAL)AND GALVANIZED CAP. MARK WITH4X4. PAID AS WATER SERVICE CAP.
C O R P O R A T I O N● ●
TO THE SLOPE OF THE RAMP.SURFACE TEXTURE OF THE CURB RAMP SHALL BE OBTAINED BY COARSE BROOMING PERPENDICULARTHE DETECTABLE WARNING FIELD SHALL BE YELLOW UNLESS OTHERWISE SPECIFIED.AND PAID FOR BY THE SQUARE FOOT AS "CONCRETE SIDEWALK 4-INCH"IN THE CURB RAMP, INCLUDING THE CONCRETE UNDER THE DETECTABLE WARNING FIELD, SHALL BE MEASUREDBY THE LINEAL FOOT AND PAID FOR AS "CONCRETE CURB AND GUTTER 30-INCH TYPE D". THE CONCRETEDETECTABLE WARNING FIELD". THE CURB AND GUTTER THRU THE CURB RAMP OPENING SHALL BE MEASUREDDETECTABLE WARNING FIELD SHALL BE MEASURED AND PAID FOR BY THE SQUARE FOOT AS "CURB RAMPTYPE 1 RAMPS SHALL HAVE NORMAL SIDEWALK APRONS AND CURB ON BOTH SIDES OF RAMP.
GENERAL NOTESRAMPS SHALL BE BUILT AT 12H:1V OR FLATTER. WHEN NECESSARY SIDEWALK ELEVATIONSMAY BE LOWERED TO FACILITATE PROPER RAMP SLOPE.
PAVEMENT MARKING CROSSWALK (WHITE)CONTRACTION JOINT FIELD LOCATED1/2' EXPANSION JOINT-SIDEWALKLEGENDPROVIDE LANDING AT TOP OF RAMP WITH NO MORE THAN 2% SLOPE IN ANY DIRECTION.ON RAMP (2" MINIMUM CURB HEIGHT).ON THE TYPE 2 RAMP. REDUCE THE CURB HEIGHT IN THE TRIANGLE AREA TO ACHIEVE 12H:1V SLOPEWHEN THIS DISTANCE IS LESS THAN 6'-0" IT MAY BE DIFFICULT TO ACHIEVE A 12H:1V SLOPE.OF FIELD CONDITIONS.USE THE TYPE 3 RAMP WHEN A TYPE 1 OR TYPE 2 CANNOT BE ACHIEVED BECAUSE
2%
SECTION B-B
12H:1V MAX.
CURB & GUTTERTOP OF ROADWAYCONCRETE CROSSWALKWARNING FIELDDETECTABLE
VIEW A-A
DETECTABLEWARNING FIELDNORMALCROSSWALKCROSSWALKNORMAL
(CENTER OF CORNER RADIUS)TYPE 1 RAMPPLAN VIEWA
A
CONCRETE SIDEWALK2% CROSS SLOPETYPICAL
B
CONCRETE SIDEWALK2% CROSS SLOPETYPICALBOULEVARDVARIES
BOULEVARDVARIESBWARNING FIELDDETECTABLERAD.VAR.
PLAN VIEWTYPE 3 RAMP(OUTSIDE OF CROSSWALK AREA)
1.5'
TYPICAL2% CROSS SLOPECONCRETE SIDEWALK
DETECTABLEWARNING FIELDCONCRETE SIDEWALKTOP OF ROADWAYCURB & GUTTER
12H:1V MAX.
SECTION B-B
B CONCRETE SIDEWALK2% CROSS SLOPETYPICALBOULEVARDVARIES
BOULEVARDVARIESBWARNING FIELDDETECTABLE
RAD.VAR.
(ON LINE WITH SIDEWALK)TYPE 2 RAMPPLAN VIEW
SECTION A-A
12H:1V MAX.2%CURB & GUTTERTOP OF ROADWAYCONCRETE SIDEWALKLANDINGWARNING FIELDDETECTABLE
VAR.RAD.
DETECTABLEWARNING FIELDAA
VARIESBOULEVARD
VARIESBOULEVARD
TYPICAL2% CROSS SLOPECONCRETE SIDEWALK
C O R P O R A T I O N● ●
CURB & GUTTERTHIS PORTION MEASURED & PAIDSTANDARD DRIVE OPENINGEXPAN. JOINTMIN. 18" TAPERFACE OF C&GEXPAN. JOINT
BACK OF C&G3' TYP.
SPACING = 10'MAX. CONTR. JOINTCONTRACTION JOINTAS CONCRETE DRIVEWAYMEASURED & PAID FOR
EXIST. WALKNEW WALKON CONSTRUCTION PLANSTHICKNESS AS SPECIFIED
AS CONCRETE DRIVEWAYMEASURE & PAID FOR EXIST. WALKEXPAN. JOINT REQ'D WHEN NEW WALK CONSTRUCTED
PLAN VIEW
AA UNIFORM SLOPE
AT CURB FACESECTION VIEW THRU GUTTERSTANDARD CONCRETEDRIVE & DRIVE OPENING
EXPANSION JOINT
CURB & GUTTERFOR AS CURB AND GUTTER, TYPE DTHIS PORTION MEASURED & PAIDSTANDARD DRIVE OPENINGEXPAN. JOINT5' TAPER ON T/CFACE OF C&GEXPAN. JOINT
BACK OF C&GSPACING = 10'MAX. CONTR. JOINTCONTRACTION JOINT
AS CONCRETE DRIVEWAYMEASURED & PAID FOREXIST. DRIVEON CONSTRUCTION PLANSTHICKNESS AS SPECIFIED
EXIST. WALK
PLAN VIEW
EXPANSION JOINT
FOR AS CURB AND GUTTER, TYPE D
EXIST. WALK
SIDEWALK AT BACK OF CURB
ON T/C
EX. SEWER LAT.CONNECT TO EXISTING SEWER LATERAL
PROP. LATERAL; SDR 26 PVC @ 1/4" PER FT.SANITARY SEWER MAINPROPOSED WYEELEVATIONSANITARY SEWERLATERAL CONNECTIONS
TRACER WIRE
TO TRACER WIREACCESS BOX
TOP VIEWSIDE VIEW
ALUMINUM GEL PACK CONNECTOR
TRACER WIRE EXTENSION
DO NOT CUTMAINLINETRACER WIRE
TO TRACERWIRE BOX
SET SCREWTIGHTEN ONTRACER WIRETRACER WIREPASS THROUGH
TRACER WIRETAG ENDS STRIPPLASTIC
MAKE SURE BAREWIRE TOUCHEACH OTHER
CONTRACTOR SHALL USE THIS SETUP OR OTHER ENGINEER APPROVED EQUALWATER & SEWERSERVICE CONNECTIONMAILBOX INSTALLATION
NOTE: MAX BURYDEPTH = 24"
36"-40"6"-8"24"CURB AND GUTTERROADWAY SURFACE
NOTE: IF A SEWER RISER SECTION IS REQUIRED,IT MUST BE INSTALLED AT THE RIGHT OF WAYLINE UNLESS APPROVED BY THE ENGINEER.4X4 POST WITH CAP AND STUB END
STREET
STREET
"A" "A"
3'-5' RADIUSSTANDARD C & G"A""A"
TYPICAL SECTION "A"-"A"
TYPICAL PLAN VIEWPAID AS CURB AND GUTTER 6-INCH SLOPED, 36-INCH TYPE D
1'F/L
WIDTH VARIES
CONCRETE FLUME DETAIL
C O R P O R A T I O N● ●
TAPE AT 10' INTERVALSPVC WATER MAIN
TOP OF PIPETRACER WIRE ONSTAINLESS STEEL CONNECTORSTEEL PER astm a 240 UNS S300400MATERIAL: 0.062 THK STAINLESS45°
0.75 RAD.
0.75 DIA.
0.50 DIA.
0.375 DIA.
0.6251.063
APPROVED CONNECTORPVC WATER MAIN WITHRUNNING ALONG TOP OF CONNECT TO TRACER WIRE TO MECHANICAL JOINT& CONDUCTIVITY CLAMP CONNECTEDSTAINLESS STEEL CONNECTORTRACER WIRE
PVC WATER MAINCONNECTED TODUCTILE IRON TEEHYDRANT LEADDUCTILE IRON
FIRE HYDRANT & PVC WATER MAIN TRACER WIRE INSTALLATION
CONCRETE BASE (THRUST BLOCKWHEN RETAINER GLANDS CAN'T BE USED)6" D.I.P. HYDRANTLEADWATER MAIN(SIZE VARIES)
MINIMUM 8.0' COVER ORAS SPECIFIED ON PLANSTEE
ELEVATION(NO SCALE)CONCRETE BLOCK
6" RETAINER GLANDS REQ'D.MINIMUM TWO LAYERS TARPAPER1 CUBIC YD.CRUSHEDROCK
EXIST.,PROP.,OR FUTURE F/C.4'
3'
GRADE
16.75" TO22.75"
STAND PIPERETAINER GLANDS ARE REQUIRED ATALL MECHANICAL JOINT TEES, VALVES,AND HYDRANTSNOTE:TRACER WIREACCESS BOXTRACER WIRE
ADJUSTING RINGS (6" NORMAL, 10" MAXIMUM)
12"16"30"
SURFACE OF GROUTCROSS-SLOPE ON MINIMUM 1" PER FOOT
27"PRE-CAST SECTIONCASTING IS A SEPARATE BID ITEM.SEE CASTING CODE FOR REQUIRED CASTING.RIM ELEV. NOTED ON PLANSTYPICAL PLAN
21WITH SEWER PIPE.MANHOLE CONNECTIONSSHALL BE USED AT ALLWATERTIGHT FLEXIBLE CONNECTIONSARRANGEMENTS.FOR PIPE SIZES ANDSEE CONSTRUCTION PLANSNOTES
GROUT6" PREFORMED BASE
1/2 PIPE DIA.
VARIESK KP
R.C.P. PRE-CAST SECTIONS
TYPICAL SECTIONSANITARY SEWER MANHOLE
12"27"168"11'27"142"10"27"128"9"27"114"8"27"100"7"27"86"6.5"27"79"6"27"72"5.5"27"65" 96"8-FT144"120"108"12-FT10-FT9-FTSANITARY MANHOLE TYPEDIMENSIONSP (DIA.)KW (DIA.)H (DIA.)4-FT4.5-FT5-FT5.5-FT6-FT7-FT48"54"60"66"72"58"27"5" 84"
WATERTIGHT FLEXIBLE CONNECTION
W
8.5' BURY HYDRANTOR AS SHOWN ON PLANS CASTING CODETYPE 3 NEENAH R-1916-F OR E.A.E., BOLT-DOWN LID1 NEENAH R-1642-5005 TYPE B LID, GASKETED, W/ TWO CONCEALED PICK HOLES (NON LETTERED) OR E.A.E.2 NEENAH R-1642-A, TYPE B LID, GASKETED, W/TWO CONCEALED PICK HOLES (NON LETTERED) OR E.A.E. (LOW PROFILE)
C O R P O R A T I O N● ●
STORM SEWER MANHOLES
16"
K8"8" THICK REINFORCED BASE
CIRCULAR PRE-CAST SECTIONPGROUT 1/2 PIPE DIA.
ADJUSTABLE RINGS(6" NORMAL, 10" MAX)RIM ELEV. NOTEDON PLAN.SEE CASTING CODEFOR REQUIRED CASTING(CASTING IS A SEPARATE BID ITEM)W=SLAB DIA.
H
Q=BASE DIA.
T
OPTIONAL 8" SOLIDBLOCK MASONRY TOONE ROW ABOVE OUTLET PIPE WHEN REQ'D
MIN. BENCH SLOPETO BE 1"/FT.
SECTION
84"6"5"27"66"58" 72"66"60"54"48" 7-FT6-FT5.5-FT5-FT4.5-FT4-FT
Q (DIA.)H (DIA.)W (DIA.)TKP (DIA.)DIMENSIONSSTORM MANHOLE TYPE9-FT10-FT12-FT108"120"144"8-FT96"65"72"27"5.5"8"72"80"27"6"8"79"86"27"6.5"8"86"94"27"7"8"100"108"27"8"8"114"120"27"9"8"128"132"27"10"12"142"146"27"11'12"168"180"27"12"12"
24"OUTLET PIPE (BID ITEM)INLET PIPE WHEN REQ'D.
SEE CONSTRUCTION PLANSFOR PIPE SIZE & GRADE.O.E.A.E. = OR ENGINEER APPROVED EQUAL.NOTE
36"
CASTING F/L GRADE GIVENON CONSTRUCTION PLANS COVER (SEPARATE BID ITEM)TYPE H-D=NEENAH R-3290-A, TYPE "C" GRATE O.E.A.E.ADJUSTING RINGS AS REQUIREDPRE-CAST CONCRETE INLET
6" PRE-CAST BASE
TYPE H-S=NEENAH R-3067, TYPE "R" GRATE O.E.A.E.TYPE H=NEENAH R-3067-L, TYPE "L" GRATE O.E.A.E.2" RADIUSON PLANS (VERT. FT.)
SECTION VIEWCATCH BASIN 2' X 3'
PLAN VIEWCATCH BASIN
TYPE Z=NEENAH R-3170, TYPE "B" GRATE O.E.A.E.LAYING CONDITIONS FORSANITARY SEWER PIPE, WATERMAIN, & STORM SEWER PIPE
12" 12"
UNSUITABLE TRENCH FOUNDATION
6"
12"
WET OR UNSTABLE TRENCH FOUNDATION
6"4"12"
ROCK FOUNDATION
6"
5"
SUMP DEPTH AS SHOWN ON PLAN1.5' TYPICAL
TYPE CASTING CODE1 NEENAH R-1642-5005 TYPE B LID, GASKETED, W/ TWO CONCEALED PICK HOLES (NON-LETTERED) OR E.A.E.2 NEENAH R-1642-A, TYPE B LID, GASKETED, W/TWO CONCEALED PICK HOLES (NON-LETTERED) OR E.A.E. (LOW PROFILE)3 NEENAH R-1916-F OR E.A.E.4 NEENAH 3067 OR E.A.E.
··CONCRETE CURB & GUTTER
C O R P O R A T I O N● ●
C O R P O R A T I O N● ●
LIGHTSWARNINGTURN ONBUTTON TOPUSH
C O R P O R A T I O N● ●
····
·
·
·
·
·
···
··
·
C O R P O R A T I O N● ●
C O R P O R A T I O N● ●
C O R P O R A T I O N● ●
·······
ENDROAD WORK
ENDROAD WORK
C O R P O R A T I O N● ●
AA
C O R P O R A T I O N● ●
C O R P O R A T I O N● ●
C O R P O R A T I O N● ●
C O R P O R A T I O N● ●
C O R P O R A T I O N● ●
C O R P O R A T I O N● ●
C O R P O R A T I O N● ●
C O R P O R A T I O N● ●
C O R P O R A T I O N● ●
C O R P O R A T I O N● ●
C O R P O R A T I O N● ●
C O R P O R A T I O N● ●
C O R P O R A T I O N● ●
Date: 4/9/2026
Job Name: Summit Ridge- PH1
Address: Chippewa Falls, WI
6451 160th Ave, Bloomer WI 54724
715-559-0443/ damian@cvexcavating.com
ITEM # DESCRIPTION QTY UNIT PRICE TOTAL
-$
1 Demo 1 152,464.00$ 152,464.00$
* Clear & grub, asphalt & concrete -$
2 Ret Pond/Bio Complete 1 215,150.00$ 215,150.00$
* 3 ponds, Clay Liner & Soils, Plantings
3 Erosion Control Complete 1 40,386.50$ 40,386.50$
*Silt Fence & Seeding, Emat -$
4 Restoration Complete 1 76,275.00$ 76,275.00$
*Spread Topsoil, Seeding Mass areas -$
5 Street Construction 1 157,377.00$ 157,377.00$
*Build Roadway, Gravel Raod & sidewalks -$
6 Sewer & Water Utilities 1 597,188.60$ 597,188.60$
*sewer/water & storm utilities -$
7 Concrete Complete 1 170,168.00$ 170,168.00$
*Curb & sidewalks -$
8 Asphalt Complete 1 178,566.09$ 178,566.09$
*paving & Pavement Markings -$
9 Mass Site Grading 1 248,100.00$ 248,100.00$
*strip topsoil, cut/fill approx 125,000 cy -$
10 Permits- City Erosion Control 1 1,082.72$ 1,082.72$
11 Geo Tech Services-PSI 996090 1 12,750.00$ 12,750.00$
12 Geo Tech Services-PSI 952447 1 800.00$ 800.00$
13 traffic Control 1 2,000.00$ 2,000.00$
-$
1,852,307.91$
711,012.00$
1,141,295.91$
EXCAVATION PROPOSAL
*Job Description: Summit Ridge Development & Intersection
City & Aspirius Portion
Remaining CDPG
Total
Page 1 of 6
STATE TRUNK HIGHWAY CONNECTION APPLICATION
Wisconsin Department of Transportation (WisDOT)
DT1504 3/2026 Wis. Stat. §§ 86.07(2)(a), 84.09, 84.25, 84.295 & Wis. Adm. Code Ch. Trans 231
• Use this form to apply for constructing a new connection (driveway, road/street intersection , trail)
to a state trunk highway (STH), or for removing, allowing, or altering an existing connection.
• If the property has any legal restrictions that prohibit access to a STH, WisDOT cannot approve
a STH connection for the property.
• One DT1504 form is required per connection. Please type or print neatly in ink. Fill out the
required information on all pages of this form per the instructions. For more information, visit:
https://wisconsindot.gov/Pages/doing -bus/real-estate/permits/connections.aspx
• Provide a copy of the property deed, title work related to the property purchase, and any
property surveys.
Tracking #: 09-100350355-2026
WISDOT OFFICE
INFORMATION Northwest Region - Superior
1701 North Fourth St
Superior, WI 54880
Telephone: 715-395-3036
Email: halle.sharp@dot.wi.gov
APPLICANT
INFORMATION 1. Applicant Name and Mailing Address
(Street/PO Box, City, State, ZIP Code )
Brandon Cesafsky
City of Chippewa Falls
2. Property Owner Name and Mailing Address
(If not applicant)
3. Authorized Representative Name and Mailing Address
(If not applicant) . Explain relationship to applican t.
CONNECTION LOCATION
INFORMATION
4. Highway Number(s) 5. County 6. City Village Town 7. Side of the Highway
178 Chippewa of: Chippewa Falls North South East West
8. Located within the: 9. Fire or Street Number (If applicable)
Quarter, of the Quarter, Section 33, Town 29 North, Range 08W
10A. Name of Nearest Side Road from Location 10B/C. Distance and Direction from the Side Road 11. How far is the location from the nearest
non-side road connection (driveway or
trail crossing) on the same highway? N/A Chippewa Falls City Limit - E Park Ave
(Feet or Miles) (N, S, E, W, A) (Feet or Miles)
Completed by WisDOT Latitude: Longitude:
CONNECTION TYPE
INFORMATION
12. Proposed Activity
(Check one)
13. Proposed Use (Check one category for (a)-(g). Provide trail description if (d) is checked .
Check any other use items if applicable. See instructions for category d escriptions.)
16. Proposed Trips Per Day (Check one)
Seasonal 51-100
1-25 101-1000
26-50 Over 1000
Peak hour traffic count:
Construct new
Remove existing
Allow existing
Alter existing
Choose all applicable
items from Alter list at
the bottom of page 2
a) Commercial – rural e) Commercial – urban Temporary
b) Residential – rural f) Residential – urban Shared
c) Agricultural g) Public Road Private road
d) Trail or trail crossing Emergency
Recreational
Utility
SEE PAGE 2 for QUESTIONS 17 -32.
SEE PAGE 3 FOR INDEMNIFICATION.
SEE PAGES 4-6 FOR CONDITIONS
AND PROVISONS. 14. Proposed Width: 10' 15. Proposed Surface : Asphalt
X 715-726-2736
(Applicant, Property Owner, or Authorized Representative) (Date) (Telephone Number) (Email address)
The applicant affirms that all information provided on and submitted with this form is correct and complete. Providing incorrect or
incomplete information may result in permit denial or revocation as well as criminal prosecution under Wis. Stat. § 946.32.
Completed by Wisconsin Department of Transportation – REVIEW UPON PERMIT ISSUANCE
Application DISMISSED – ACCESS RIGHTS (1) NOT OWNED BY
APPLICANT OR (2) CONTROLLED UNDER WIS. STAT. § 84.25 or § 84.295.
NO RIGHT TO APPLY EXISTS . NO APPEAL AVAILABLE .
Permit DENIED – MAY BE APPEALED UNDER WIS. STAT . § 86.073.
Work Permit APPROVED – ONLY FOR PERFORMING WORK ON
STATE TRUNK HIGHWAY RIGHT-OF-WAY UNDER WIS. STAT. § 86.07(2)(a).
THIS PERMIT IS REVOCABLE.
Remove Existing: Legal § 84.25 Nonconforming ILLEGAL
GENERAL CONDITIONS OF ISSUANCE #1-43 APPLY
Permit Provisions Also Apply: Supplemental Special
Lane Closure System notification required
Insurance required and/or Irrevocable letter of credit required
Permit voids/replaces permit #
Transportation project plat ID #
Temporary access. Permit expiration date below. See #35.
Authorized Access Point DOCUMENTED
APPROVED BY WisDOT UNDER PREVIOUS WIS. STAT. § 84.25 PROJECT .
THIS IS NOT A PERMIT BUT SERVES TO DOCUMENT THE TYPE, USE, TRIPS
PER DAY, CONFIGURATION, DRAINAGE, ETC. FOR THE STH CONNECTION.
Connection Permit APPROVED
DOES NOT CREATE A RIGHT OF ACCESS OR ACCESS EASEMENT FOR THE
PROPERTY. THIS PERMIT IS REVOCABLE.
Shared
Connection
Co-user name(s):
Related ID #(s):
Comments: Permit for the Old Abe Trail on the West side of Highway
178
Application Submitted Approved Work Start Approved Work Finish Approved Work Extension
X Halle Sharp 100350355 05/26/2026
(WisDOT Authorized Representative Signature – If Computer-filled, Brush Script Font) Application Completed Identification Number Issued Permit Expires Permit Amended
Amendment #
Trail description (choose one)
Page 2 of 6
FOR ANY NEW OR RELOCATED CONNECTION, APPLICANT SHALL PLACE A FLAG OR MARKER IN THE HIGHWAY DITCH OR
FORESLOPE (VISIBLE FROM THE HIGHWAY) AT THE PROPOSED LOCATION FOR WisDOT SITE REVIEW.
28. Main Contractor Name, if applicable Alter Existing Items List
(From question 12 – choose all applicable items.
See instructions for Alter descriptions.)
29. Contractor Representative Name and Title
Available choices:
• Widen
• Pave surface
• Replace culvert
• Change existing use
• Grading or drainage
• Highway improvements
• Other
30. Office Telephone Number
31. Cellular Telephone Number
32. Contractor Email Address
Note: In questions 17-26, “the property ” refers to the property for which this application is being made.
17. Yes No Is the property zoned? In either case, provide the appropriate documentation from the jurisdictional zoning authority.
18. Explain how the land is currently being used:
19. Yes No Are you aware of any plan to change the zoning or land use for the property? If yes, explain.
20. Yes No Is this connection for the property that was also part of a land division or assemblage created on or after 2/1/99? If yes, explain.
21. Yes No Do you own other property abutting the highway that is next to the property that this connection will serve? If yes, explain.
22. Yes No Does the property abut other public roads? If yes, provide all road names.
23. Yes No Are there any existing connections to any road serving the property? If yes, how many?
24. Yes No Are there any restrictions on the number, use, or location of connections to the property? If yes, explain.
25A. Yes No Are there any access easements across the property, or does any other property obtain access to a state trunk highway by
crossing the property?
25B. Yes No Are there any easements or arrangements that allow the property to access a public road by crossing another property?
If you answered yes to 25A and/or 25B, explain. See the instructions for what information to provide.
Note: If you answered “yes” to question (Q) 24, 25A or 25B, provide a copy of all documents relevant to the restrictions and/or easements .
26. Provide all property tax identification
numbers that will be using the connection :
27. List the proposed work start and finish dates for construction of the connection. Check not applicable if no work is needed for this permit.
Start: Finish: Not Applicable
(M/D/YYYY) (M/D/YYYY)
Best times of the day and/or days of the week that are
more convenient for WisDOT to call you if needed:
(Note: Once a permit is issued, the applicant become the permittee)
Page 3 of 6
INDEMNIFICATION
The Permittee shall save and hold the State, its officers, employees, agents, and all private and governmental
contractors and subcontractors with the State under Chapter 84 Wisconsin Statutes, harmless from actions of any
nature whatsoever (including any by the Permittee himself/herself) which arise out of, or are connected with, or
are claimed to arise out of or be connected with any of the following:
1. Any of the work done by the Permittee, or Permittee’s contractors or agents (collectively “WORKERS”).
2. The construction or maintenance of facilities by the Permittee or WORKERS, pursuant to this permit or any
other permit issued by the State for construction of facilities within the highway.
3. As a result of action or inaction by Permittee or WORKERS resulting in damage to another that occurs:
a. While the Permittee or WORKERS are performing work, or
b. While any of the Permittee's or WORKER’s property, equipment, or personnel, are in or about such
place or the vicinity thereof, or
c. While any property constructed, placed, or operated by or on behalf of Permittee or WORKERS remains
on the State's property or right-of-way pursuant to this permit or any other permit issued by the State.
This hold harmless provision applies, without limiting the generality of the foregoing, to all liability, damages, loss,
expense, claims, demands and actions on account of personal injury, death or property loss to the State, its
officers, employees, agent s, contractors, subcontractors or frequenters, to the Permittee or WORKERS, their
employees, agents, contractors, subcontractors or frequenters, or to any other persons, whether based upon, or
claimed to be based upon, statutory (including, without limitin g the generality of the foregoing, worker's
compensation), contractual, tort, or whether or not caused or claimed to have been caused by active or inactive
negligence or other breach of duty by the State, its officers, employees, agents, contractors, subco ntractors or
frequenters, Permittee, WORKERS, their employees, agents, contractors, subcontractors or frequenters; or any
other person.
Without limiting the generality of the foregoing, the liability, damage, loss, expense, claims, demands and actions
indemnified against shall include all liability, damage, loss, expense, claims, demands and actions for damage to
any property, caused by Permittee or WORKERS pursuant to this permit or any other permit issued by the State
for damage to property, lines or facilities on highway right-of-way resulting in any loss of power, telephone service,
communications, data, information, or material; or inv olving property rights any other person of any kind
whatsoever.
The Permittee shall at his/her own expense investigate all such claims and demands, attend to their settlement or
other disposition, defend all actions based thereon and pay all charges of attorneys and all other costs and
expenses of any kind arising from any such liability, damage, loss, claims, demands and actions.
All facilities constructed within the highway right -of-way by Permittee become the property of the State of
Wisconsin, Department of Transportation, and may be altered or removed by the maintaining authority of the
highway in accordance with state law.
Any transfer, whether voluntary or involuntary, of ownership or control of any property constructed, placed, or
operated by or on behalf of the Permittee or WORKERS that remains on the State's property or right -of-way
pursuant to this permit shall not release Permittee from any of the indemnification requirements of this permit.
(Note: Once a permit is issued, the applicant become the permittee)
Page 4 of 6
GENERAL CONDITIONS OF ISSUANCE
1. All connections have restrictions that are documented in the preprinted
and filled -in information on this form along with any conditions,
covenants, supplemental and special provisions, superimposed notes,
and detail drawings added by WisDOT. In addition to WisDOT’s
approval, permittee shall also comply with relevant state statutes and
administrative rules, plus any laws, codes, rules, regulations,
ordinances, and permit requirements of other jurisdictional agencies.
Alteration of this form by the permittee is prohibited.
2. The permit authorizes the work for the applicant (“permittee”) indicated
on this permit. It does not grant authority for the work of any other,
either by present or future installation.
3. Comply with this permit in its entirety. Failure to comply with any part
of this permit is the permittee’s responsibility, which includes full
restitution of any costs WisDOT incurs to remedy non-compliance acts
and may include treble damages under Wis. Stat. § 86.02. Further, if
permittee fails to comply with any permit term, and WisDOT seeks to
compel compliance by the permittee, enforce a permit term, revoke this
permit, or recover costs associated with completing work required
under this permit or redoing work not up to standards or specifications,
permittee shall also be responsible for paying a sum that reimburses
the State for time expended by its attorneys working on the matter and
all court costs.
4. The venue for any court action related to permit enforcement shall be
Dane County, Wisconsin.
5. Immediately cure any violation of this permit, particularly any failure to
maintain a safe work site and proper work zone traffic control. Failure
to do so may result in WisDOT stopping further work, removing
permittee from the highway right-of-way (ROW), revoking the permit or
any combination of these actions.
6. Except in cases where the permitted connection is constructed by
forces acting on behalf of WisDOT as part of a highway improvement
or maintenance project, the permittee shall do all of the following:
(a) Furnish all materials, do all work, and pay all costs for construction
and maintenance of the connection and its appurtenances in the
ROW. Use the appropriate materials and type and quality of the
work for the connection type specified in this permit.
(b) Do all work without jeopardy to, or interference with, traffic using
the highway
(c) Be responsible for all additional work WisDOT deems necessary
due to plan error, omission, or unknown or changed field conditions
(d) Maintain the connection and its appurtenances within ROW limits,
which includes keeping them in a proper state of repair, preventing
the blockage or impairment of ROW drainage, and preventing the
occurrence of aboveground obstacles that may cause serious
injury or death to a motorist
(e) Do n ot disturb or cause the disturbance of any survey marker
without the prior written approval of WisDOT
7. The permittee shall not make any changes to the connection, its
appurtenances, or the highway ROW, including, without limitation,
changes to the location (Q4-11), use (Q13), width (Q14), surface
(Q15), or increase the number of trips per day (Q16) indicated by this
permit without obtaining prior written approval from WisDOT.
WisDOT will evaluate all potential highway impacts that may arise from
any proposed change(s) and therefore, does not guarantee approval.
8. WisDOT does not assume any responsibility for removal or clearance
of snow, ice, or sleet, or the opening of windrows of such material upon
any portion of any connection along any state trunk highway even
though snow, ice , or sleet is deposited or windrowed on said
connection by its authorized representative while performing normal
winter maintenance operations under Trans 231.02(6). No snow, ice ,
or sleet removed from the connection shall be deposited on any
highway pavement or shoulder or in a manner that creates a safety
hazard or obstruction to highway drainage .
9. Rock, asphalt, concrete, timber, or other embankment
retention or marking treatments for the connection are
prohibited. A plastic or metal post with or without a blue
reflector(s) may be installed on each connection side. Posts
cannot be larger than 2” square. Acceptable posts are shown
at right. Plastic or metal posts shall not be stronger than the
equivalent of a 1½-inch diameter standard metal pipe. Using
red or amber reflectors is prohibited under Wis. Stat. §
346.41(3). Using wood posts also is prohibited.
10. WisDOT reserves the right to revoke any permit issued and the
right to make such changes, additions, repairs, relocations, and
removals within statutory limits to the connection or its appurtenances
on the ROW as may at any time be considered necessary to facilitate
highway relocation, reconstruction, widening, and maintenance, or to
provide proper protection to life and property on or adjacent to the
highway, or if alternative access to the property becomes available.
11. If the permitted work has not begun by the Approved Work Finish Date,
this permit is null and void. If work has been started but not completed
by the Approved Work Finish Date, no additional work shall be done
unless authorized through an approved Work Extension Date or a
subsequent permit from WisDOT. WisDOT does not guarantee
approval of a time extension or subsequent permit since the conditions
WisDOT based its permit approval upon may have changed between
the permit issuance and time extension request date s. Execution of
any part of the work shall verify agreement by the permittee to conform
to this permit and to be bound by all of its requirements, restrictions,
and obligations, all of which shall continue to be in full force and effect.
12. Any connection or related feature built within the ROW becomes part
of the highway and is subject to the highway maintaining authority’s
jurisdiction. Permit issuance does not guarant ee in the future that the
connection will remain in place or be allowed to function in the same
manner as when it was installed. WisDOT or any other authority with
jurisdiction over the highway may alter the highway in such a manner
that changes the connection’s function by installing medians, lanes, or
traffic control devices, or may require that the connection be closed
entirely. WisDOT attempts, in exercising its police powers, to avoid
unreasonably restricting property access to a highway. Abutting
landowners are generally not entitled to compensation for highway
changes made by the maintaining authority for police power activities .
13. The permittee agrees that any connection constructed by or for the
permittee is for the purpose of obtaining access to the property listed
in Q26. The connection shall not be used for parking or servicing
vehicles, or for advertising, storing, or selling goods on the ROW.
WORK ZONES
14. Before starting any permitted work , install the required warning
signs, devices, etc. and ensure all are fully functional and maintained
to protect the public, workers, and work site until all work is complete.
Augment the work zone with signs, devices , and flaggers as needed
to always protect people and property from injury or damage in all
conditions, including changed or changing conditions. At all times while
working within the highway ROW, ( a) wear high-visibility safety attire,
and (b) activate flashing (or strobe) amber or white lights on all vehicles
and equipment. Comply with the Work Zone Field Manual or Wisconsin
Manual of Uniform Traffic Control Devices, current editions, for proper
layouts, designs, sizes, and quantities of warning signs and devices ,
including other items that may be relevant for the work zone.
15. Secure the work site and associated traffic control zone against any
hazard to the public, both when the site is attended and unattended
during off-hours, holidays, and nighttime hours. This includes vehicles,
equipment, and materials.
16. Do not keep vehicles , equipment, or materials related to this permit
within the highway ROW limits except those items that are actively
being used in the work operation.
17. Perform all permitted work without obstructing or closing any part of
any travel lane or fully closing any road unless authorized by WisDOT.
18. Derive no direct access to install, maintain , or repair the connection
from a freeway travel lane , shoulder, or from any interchange ramp
unless authorized by WisDOT in this permit . If access is needed due
to an emergency, immediately contact the Wisconsin State Patrol and
WisDOT Region Office listed on this permit. The u se of freeway
median crossovers to make U -turns or obtain highway access is
prohibited and subject to citation by law enforcement.
19. Any disturbance to, operation within, or use of a highway median is
prohibited unless authorized by WisDOT in this permit.
20. Coordinate the permitted work and in no case interfere with any
ongoing highway improvement project.
21. When working upon a highway, flashing green warning lamps may be
used by WisDOT, county, and municipal highway department vehicles
under Wis. Stat. § 347.26(7) and utility vehicles under 2023 Wisconsin
Act 155. Contractor vehicles shall not use green warning lamps.
(Note: Once a permit is issued, the applicant become the permittee)
Page 5 of 6
CONSTRUCTION
22. Notify the WisDOT representative listed on this permit 3 days before
starting any work and call Diggers’ Hotline 811 or (800) 242 -8511.
23. Determine the locations of any existing facilities in the area affected by
the permitted work and protect or take actions needed to protect them
from any damage. All notifications to facility owners, including but not
limited to utilities, are the permittee’s responsibility.
24. Always keep a complete copy of the permit (which may be electronic)
at the job site when the permitted work is ongoing. If applicable, a lso
keep a copy with a project manager or supervisor familiar with the
permit and all of its details and requirements.
25. Construction methods shall meet the requirements of this permit and
be performed in accordance with methods and procedures set forth in
the current edition of WisDOT’s Standard Specifications for Highway
and Structure Construction.
26. Install the connection in the specified permit location. Upon discovery
of any error in placement or upon WisDOT order, move any part of the
connection to the correct location. Any connection part located other
than as specified in this permit exists at permittee’s sole risk.
Accordingly, if the same is undetected or is suffered to remain in
variance to the permit, the permittee shall hold the State, its
employees, agents, and officers harmless and free of any cost, claim
or liability associated with any accidental damage to such facility that
may result from a highway construction, maintenance, traffic control,
or ROW management project or function .
27. The permittee may be required to excavate part of the ditch bottom or
backslope to properly install a culvert endwall. Direct questions about
this work to the WisDOT Region office that issued this permit.
28. Do not at any time open any greater length of trench than necessary
to maintain essential work progress. Use temporary sheeting, shoring,
or trench boxes as needed to prevent cave -ins.
29. Comply with applicable laws, rules, policies, and regulations when
acting under this permit especially when within tribal or federal lands.
Provide documentation as needed when on WisDOT ROW to prove
compliance or coordination with the following agencies :
• Wisconsin Historical Society to avoid or mitigate any potential
cultural resource (archeological, historical, burial site, etc.) impacts
per Wis. Stat. § 44.40.
• Department of Natural Resources to avoid or mitigate any potential
stormwater runoff, site erosion, we tland, waterway, and
endangered or threatened species impacts.
30. Comply with all applicable regulations and codes, including, but not
limited to, the U.S. Department of Labor, Occupational Safety and
Health Administration, 29 CFR Part 1926 for construction safety
precautions and operations.
EROSION CONTROL
31. Implement erosion control best management practices (BMPs) prior to
and during work operations pursuant to Wis. Admin. Code Ch. NR 151
and any applicable municipal or county ordinances. Provide copies of
any required Department of Natural Resources, municipal, or county
construction permits. Provide and maintain erosion control BMPs to
protect all restored areas upon completion of the permitted work and
until replacement vegetation achieves sustained growth . Remove all
sediment or material site runoff deposited onto WisDOT ROW and
stabilize the area within 24 hours of the release. Immediately clean all
sediment or materials deposited onto highway travel lanes or
shoulders. Clean downstream ditches , culverts, and storm sewers to
ensure positive flow prior to finalizing the work . Remove temporary
erosion control BMPs following work completion.
AFTER CONSTRUCTION
32. Send electronic notice to the WisDOT representative who approved
this permit within 10 calendar days of completing the work including
all restoration. Notice may also be sent via telephone or regular mail.
33. Cure faults related to work or facilities under this permit that, in
WisDOT’s opinion, obstruct highway drainage or in any other manner
adversely affect highway maintenance or operation, and restore the
ROW as directed by WisDOT and to its satisfaction.
34. Alter the permitted connection as may be ordered by WisDOT to
facilitate highway improvements, safety, operations, or maintenance .
Accept all costs of constructing , maintaining, altering, temporarily
moving, or relocating the permitted connection.
RESTORATION
35. All restoration work shall meet qualities, grades, compactions , and
conditions of this permit and be performed in accordance with methods
and procedures set forth in the current edition of WisDOT’s Standard
Specifications for Highway and Structure Construction. For temporary
permits, complete all restoration prior to the expiration date.
36. Promptly restore to WisDOT’s satisfaction and at least pre -existing
conditions any highway facil ity, surface, shoulder, curb, gutter, sign,
sidewalk, driveway, gravel base, ballast , ditch, vegetation, drainage
appurtenance, guardrail, electric conduit/cable, or property of any type
or other ROW element disturbed by any work under this permit.
37. Sawcut all pavement full -depth when open cutting. Restore concrete
pavement in conjunction with WisDOT standard detail drawing 13C9.
Remove and restore concrete pavement to the nearest joint for full lane
width or provide a detailed joint plan for review and approval. The
minimum patch dimension is 6’ by the full lane or shoulder width. High
early strength concrete may be specified if needed. For concrete
pavement repair guidance, s ee FDM 14 -25-10, Exhibit 10.1 . The
minimum asphalt patch dimension is 6’ by the distance to the nearest
joint or seam. Only use hot mix asphalt.
38. Backfill all excavations permitted within highway pavement or shoulder
areas with suitable granular material, placed in lifts or layers 12” or less
each in depth, and mechanically compact to meet appropriate density.
Do not use water jetting to perform mechanical compaction. Repair to
WisDOT’s satisfaction any subsequent heaving, settling, or other
defects or faults attributable to the permitted work.
39. Adjust manhole covers, shut-off and regulator valves, and like facilities
to the level of the immediately adjacent grades .
40. Restore any turfed ROW area disturbed under this permit with fine -
graded topsoil having a depth of not less than 4 ” and reseeded to
perennial grass or sodded to WisDOT’s satisfaction. Water the planted
seed or sod until fully established.
41. Construct smooth and finished slopes at a ll locations where regraded
portions of the highway ROW meet the lands of adjacent property
owners. Do not trespass on adjacent property owner’s lands.
42. Dispose of any brush, trash , or waste materials resulting from the
permitted work off the ROW in accordance with applicable solid waste
disposal regulations. Dumping or littering is prohibited.
43. WisDOT may notify permittee that restoration must be completed by a
specific time if it is not done voluntarily without delay . If the permittee
fails to satisfactorily complete the restoration by the specific time,
WisDOT may arrange for the restoration to be completed and bill
permittee accordingly. If this occurs, t he permittee shall pay for all
restoration costs, which may be tripled under Wis. Stat. § 86.02.
SUPPLEMENTAL PERMIT PROVISIONS (#44-67)
The permittee shall abide by the following checked provisions:
STATE HIGHWAY DETOUR
44. Complete a permit application form to detour state highway traffic
(DT1479). This permit shall only be in effect if WisDOT approves
the matching DT1479 permit.
WORK RESTRICTIONS
45. Daily, holiday, or seasonal work restrictions apply to the permitted
work as detailed in the special permit provisions . Review the se
restrictions with the WisDOT Region Office identified in this permit.
NOTIFICATIONS
46. Contact the WisDOT Region office identified on this permit to
arrange for a WisDOT representative to inspect the work site.
Perform no work under this permit prior to his/her arrival.
47. Contact the WisDOT Region office identified on this permit prior to
completing the permitted work to arrange for an inspection by a
WisDOT representative before the permittee’s contractor or work
crew leaves the site.
48. Call WisDOT’s Traffic Management Center ( TMC) / -
on a weekly basis or as otherwise determined by the TMC before
working on any freeway. The TMC may place restrictions on work
times and lane/shoulder closures based upon various special
events, oversize freight movements, or daily peak travel times.
(Note: Once a permit is issued, the applicant become the permittee)
Page 6 of 6
TREE & VEGETATION MANAGEMENT
49. Plant trees or vegetation only in the locations and with the species
as detailed on the plans included and approved with this permit, or
as WisDOT specifies in the field.
50. Replace trees or vegetation removed with the species and in the
manner required in any special provisions of this permit.
51. Maintain all plantings according to the special permit provisions.
52. Do not place any sign or marker identifying the plantings within the
highway ROW.
53. WisDOT accepts no responsibility for loss occurring to plantings.
Be fully aware that plantings are subject to:
• Thinning or mortality
• Normal hazards from maintenance operations, snow control,
and public utility installation, maintenance, or alteration
• Trimming or removal when the plantings cause sight distance
restrictions or hazardous snow/ice conditions on the highway
• Destruction when highway reconstruction is done
• Partial or complete abandonment or obliteration, or return to
private ownership, if future highway relocations are made
• Removal by government authorities, including WisDOT, under
Wis. Stat. § 86.03(3)(a)
54. Do not cut, trim, or damage t rees or vegetation to facilitate the
permitted connection’s construction or maintenance except as
authorized by the owner of such tree or vegetation. (Wis. Stat. §
86.03). Cleanly cut the exposed ends of all tree roots found during
excavation with suitable pruning tools immediately after exposure.
Comply with all applicable laws, regulations, and local ordinances
(even those stricter than WisDOT specifications) governing tree
sale, transport, cutting , or pruning and with ANSI A300 , which is
the generally accepted industry standard for tree care practices .
55. Trim only trees or vegetation necessary to provide safe clearances
or by special provisions. Do not damage n on-target trees or
vegetation. Do not clear-cut trees or vegetation.
56. Survey trees or vegetation to be removed and inspect jointly with
a WisDOT representative prior to starting any highway ROW work.
57. Do not cut or trim oak trees between April 15 and October 15 to
prevent Oak Wilt Disease from spreading unless a thick coat of
asphalt base tree paint is applied immediately after any cut,
trimming wound, or abrasion made between those dates.
58. Remove each stump in the area where cutting is permitted,
including stumps created by windfalls or prior cutting, by cutting
the stump flush with ground level or removing it with a stump
grinding operation. The permittee shall be responsible for any
damages to mowing equipment or any vehicle caused by any
stump not being cut in accordance with this requirement.
59. Treat all deciduous tree stumps with an herbicide approved for use
to prevent future sprouting. Do not treat evergreen tree stumps.
60. Dispose of all cut, trimmed, or sprayed trees, logs, branches,
stumps, and other vegetation in the following manner(s). If more
than one box is checked, verify if related special permit provisions
have been added. Off-site means off the ROW. In all cases, avoid
disturbance to any manicured lawn.
Cut trees, logs, or trimmed branches may be chipped and used
for mulch on the ROW in a layer not exceeding 3” and in a way
that does not interfere with highway drainage
Sprayed or basally treated trees and v egetation shall be cut
and hauled off-site to a proper location
Permittee may haul materials to a specifi c location off-site
upon receiving the landowner’s permission
Permittee may keep the materials after hauling them off-site
Other adjacent landowners may keep the materials off-site
Haul only the materials that have salvage value to the nearest
county highway department or other designated site for public
sale or distribution by WisDOT
61. Promptly restore all natural highway safety features, including but
not limited to, living snow fence and headlamp screens.
VISION TRIANGLES
62. In addition to the required intersection sight distance (ISD) for the
connection, maintain vision triangles to allow drivers approaching
or stopped at the connection to safely perform the necessary
maneuvers to navigate the connection. This means eliminating all
objects that may obstruct driver views. For side road connections,
maintain vision triangles in accordance with WisDOT ’s Facilities
Development Manual Chapter 11-10-5, section 5.1.4.3. For
driveway connections, unless otherwise specified in provision #62,
maintain vision triangles as depicted in the shaded areas of the
diagram below using an ISD Left of and ISD Right of .
On land within the vision triangles, (1) do not erect buildings, signs,
billboards, fences, or anything exceeding 3 ’, and (2) do not plant
shrubs, trees, hedges, grasses, flowers, and other vegetation that
may grow to a height exceeding 3’, or continuously maintain them
to not exceed a height of 3’.
63. Follow provision #62 except maintain vision triangle s as depicted
in shaded areas of the diagram below measured at from the
white edge line instead of the minimum 15’ and using an ISD Left
of and ISD Right of .
URBAN CONNECTIONS
64. Completely remove existing curb and gutter for construction of the
connection. Such removal shall be to the nearest construction joint
and saw cut to a minimum length of 3’ for remnant curb. Join all
new concrete to existing concrete with No. 4 tie bars.
65. Construct the new concrete curb and gutter such that its gutter pan
bottom matches the gutter pan bottom of the existing curb and
gutter to allow for the drilling of tie bars into the existing concrete
pavement and to allow for an asphaltic overlay if the adjacent curb
has been previously overlaid with asphalt .
66. Saw cut the existing asphaltic pavement at a sufficient distance to
allow for concrete curb and gutter removal and prevent damage of
the remaining asphaltic pavement. After sufficient cure time of the
new concrete curb and gutter and driveway apron, overlay the curb
flange with asphaltic pavement to match existing .
CONSTRUCTION INSPECTION
67. Provide qualified construction engineering inspectors on -site at all
times during the project. Provide the name(s) and cellular phone
number(s) for the inspectors to WisDOT before any construction
begins. The inspector(s) shall ensure the work is being performed
in conformance with the plans and WisDOT specifications , which
includes items such as work zone traffic control and erosion
control. The inspector(s) shall have the authority and responsibility
to stop work operations and notify WisDOT when the permit plan
and WisDOT specifications are not being followed.
SPECIAL PERMIT PROVISIONS (#68- )
The permittee shall also abide by the following provisions:
68. Chippewa falls or its designated representative, is responsible for
all maintenance and signing of the authorized path on the state
highway right of way.