CENTRAL WISCONSIN JOINT AIRPORT BOARD — Agenda Packet
Portage County · Portage County · Central WI Joint Airport Board Meeting · meeting of Aug 11, 2026 · Agenda packets
Open the original document More from Portage County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Any person planning to attend this meeting who needs some type of special accommodation to participate should call the
County Clerk’s Office at 715-261-1500 or e-mail countyclerk@co.marathon.wi.us one business day before the meeting.
CENTRAL WISCONSIN JOINT AIRPORT BOARD MEETING AGENDA
Conference Room B – East Terminal Upper Level, Mosinee, Wisconsin
August 11, 2026 - 8:00 a.m.
2026–2028 Board Members: Chair Dave Ladick - Portage County, Vice Chair Chris Dickinson - Marathon County,
Tom Seubert - Marathon County, Kurt Kluck - Marathon County, Rick Rettler - Portage County, Matt Krembs -
Marathon County, Robin Falk - Portage County
Mission Statement: Provide premier access to the world through aviation and be a catalyst for economic growth
in our communities. Vision Statement: To be the airport of choice for central and northern Wisconsin.
The monthly meeting of the Central Wisconsin Joint Airport Board will have the option for members and the
public to call-in via telephone conference. Airport Board members and the public may join the meeting by
calling 1-469-480-4192 and entering Conference ID 586 086 871#. The conference line will be open to calls five
(5) minutes prior to the meeting start time listed above.
1. Call to Order by Chair Ladick at 8:00 a.m.
A. Pledge of Allegiance
2. Approval of Minutes of the July 14, 2026, Board Meeting
3. Public Comment Period: 15-minute time limit
4. Presentation - ARFF/SRE Facility Preliminary Design Update
5. Staff Reports
A. Director Report
i) Air Service Update
ii) Statistical Report
iii) Flight Schedule
iv) Legislative Update
v) Board Educational Travel
B. Financial Reports
i) Revenues and Expenses
ii) Budget Comparison
iii) PFC Update
iv) 2026 Joint Finance Committee Meeting
C. Operations and Project Reports
i) Update on Airport Projects
ii) Update on Airport Operations
6. Ovation
A. Fixed Base Operator Report
7. Next Scheduled Meeting Date: September 8, 2026, at 8:00 a.m.
8. Adjournment
1
CENTRAL WISCONSIN JOINT AIRPORT BOARD MEETING MINUTES
CENTRAL WISCONSIN AIRPORT TERMINAL
Conference Room A/B – East Terminal Upper Level, Mosinee, Wisconsin
July 14, 2026 – 8:00 a.m.
Airport Board: Dave Ladick – Chair Chris Dickinson – Vice Chair
Kurt Kluck Matt Krembs
Rick Rettler Tom Seubert [Absent]
Robin Falk [Absent]
Staff: Brian Grefe, Airport Director Mark Cihlar, Assistant Airport Director
Dave Drozd, Assistant Airport Director – Finance Sarah Thurs, Badging Coordinator
Visitors: Christina Cole, Kayleigh Tarbet (virtually), and Karen Sherwood (virtually) -- all from Advance Aviation;
Josh Harris, Alan Fitzpatrick, Collin Eiden, and Jason Brickl – all from Ovation
1. CALL TO ORDER
Chair Ladick called the meeting to order at 8:00 a.m. The Pledge of Allegiance was recited.
2. APPROVAL OF MINUTES
A motion was made to approve the minutes of the June 16, 2026, board meeting.
Moved by: Kurt Kluck
Seconded by: Matt Krembs
Vote: Ayes — all; Nays — none
Result: MOTION CARRIED
3. PUBLIC COMMENT
No members of the public registered to speak, and none were present in person or online. The public comment
period (15-minute time limit) was closed.
4. MARKETING PRESENTATION — ADVANCE AVIATION
2026 Creative Overview (Kayleigh Tarbet)
Kayleigh reviewed the campaigns currently running:
• Leisure campaign — targeting leisure travelers, promoting the ability to connect to hundreds of
destinations from home.
• Bleisure campaign — targeting business travelers and remote workers, with messaging tailored to that
audience.
• Northwoods campaign — targeting Chicago-area residents with second homes in Wisconsin.
2
• United service campaign — a dedicated campaign supporting United's announced return to CWA,
originally including a launch date that was later removed from creative after the date shifted; the campaign
continued to promote three-times-daily service to Chicago O'Hare and connectivity across the United global
network via a dedicated landing page and video. The campaign ran from November 2025 through the end of
May 2026 with a budget of $35,000, funded specifically in response to United's announcement.
Kayleigh noted the airport stayed close to United on booking performance throughout the campaign, and that
United was encouraged by results in CWA's market relative to other markets where United has established
service.
Kayleigh also outlined plans to continue gathering user-generated content in 2026 to refresh campaign visuals
with new, authentic imagery — building on live content shoots held at the airport in recent years — to keep
creative fresh and engagement strong. With the United campaign concluding at the end of May, United was
folded into general airline branding, with all three carriers (American, Delta, United) now featured across leisure
and bleisure landing pages and creative.
Market Data (Karen Sherwood)
Karen Sherwood presented data from Placer, a mobile-location analytics tool that tracks where travelers in the
region live and which airports (CWA, Chicago, and Minneapolis) they use. The data illustrates significant
"leakage" of local travelers to outside airports — cited at approximately 73% — highlighting opportunity for
more precise geotargeting. Karen also reviewed audience profile data (media preferences, behaviors) used to
inform messaging and channel selection, noting the approach helps target travelers who have shown a
propensity to fly rather than serving CWA messaging broadly.
2027 Strategy and Budget
Christina presented a strategy to "close the gaps" in CWA's current marketing mix for 2027, increasing and
reinforcing a full-funnel approach across the following tactics:
• Geofencing
• Paid social
• Social display
• Search engine marketing (SEM
• Over-the-top (OTT) streaming video
Staff clarified that this presentation was for board information and budget-planning purposes only; no board
action was requested. A formal budget, including any recommended marketing increase, will be brought to the
board for review in September.
5. STAFF REPORTS
A. Director's Report — Brian Grefe, Airport Director
i) Air Service Update
The FAA extended its capacity order at Chicago O'Hare through October 2027. This is the same order that
previously delayed United's original planned summer 2026 launch. As of the meeting, United had made no
changes and continues to sell tickets for its planned October 25, 2026, start of service. American was affected by
a similar order earlier in the summer but made no schedule changes affecting CWA, and staff anticipate minimal
impact on American going forward.
ii) Statistical Report
The monthly statistical report was not ready for distribution pending clarification of one data point and will be
published once finalized. Enplanement volumes were reported as up marginally, a few percentage points.
3
iii) Flight Schedule
The flight schedule (page 7 of the board packet) is largely unchanged from the prior month. Upcoming charters
include Sun Country service on July 30 to Caesar’s / Omaha and an additional Sun Country charter to Riverside /
Laughlin. NOTE: The Flight Schedule page in the July 14 Board Packet was updated at the bottom to correct the
charter schedule for August 3 to say “Riverside / Laughlin” instead of “Appleton.”
iv) Wisconsin Aviation Conference
The statewide Wisconsin Aviation Conference will be held October 26–28, 2026, in Wisconsin Dells. Board
members interested in attending were asked to contact Brian Grefe or Sarah Thurs for registration.
B. Financial Reports — Dave Drozd, Assistant Airport Director – Finance
i) Revenues and Expenses
The airport is approximately halfway through the fiscal year and tracking on budget, with results ahead of the
same period last year. Some debt service and fixed-charge expenses (including the Marathon County debt
service allocation) are anticipated in the coming months.
ii) PFC Update
The airport's current Passenger Facility Charge (PFC) application expires in 2027. Staff will begin preparing a new
PFC application later this year to avoid any lapse in the airport's ability to collect PFC funds.
iii) 2026 Joint Finance Committee Meeting
Staff plan to bring the FY2027 budget to the airport board for review and approval at its September 8, 2026,
meeting. The joint finance committee meeting is expected to be scheduled between September 8 and 14, at
5:00 p.m. The board's annual ownership-percentage recalculation (based on a five-year, 2026–2030 basis) was
noted, with Marathon County at 65.14% and Portage County at 34.86%; this percentage is used for financial
statements and cost/liability allocation.
Staff also noted parking lot equipment upgrades are underway, including new payment equipment
(approximately $36,000, ordered this week, with installation anticipated in September/early October) and a
planned reopening of the East parking lot to add capacity. The airport has also transitioned parking management
vendors, moving to a Chicago-based provider (Revcon). Separately, staff reported ongoing processing of
insurance claims related to storm and hail damage earlier this year, estimated at approximately $160,000, the
majority of which is covered by insurance.
C. Operations and Project Reports — Mark Cihlar, Assistant Airport Director
i) Update on Airport Projects
The FAA announced approximately $1.776 billion in Airport Improvement Program (AIP) grants nationally;
CWA's General Aviation Apron project was included, comprising $1.3 million in AIP entitlement funds and $1.5
million in competitive AIP discretionary funds. CWA was one of two Wisconsin airports to receive an announced
grant in this cycle. Staff have begun the contract award process and anticipate beginning construction on the
apron project in the first week of August.
The FAA also announced a $1.6 million Infrastructure Investment and Jobs Act (IIJA) grant to complete funding
for the General Aviation Terminal Building, which obligates the remainder of CWA's IIJA allocation across both
the GA Terminal and Transient Hangar projects. Both grants must still be issued to, and administered by, the
State of Wisconsin DOT.
The General Aviation Terminal Building is progressing on schedule. The Transient Hangar is running slightly
behind schedule pending subcontractor availability; steel erection is expected to begin within the next one to
4
two weeks. The Flightline Drive relocation project began the prior Monday and is expected to be completed by
the end of July.
On the ARFF/SRE (Aircraft Rescue and Firefighting / Snow Removal Equipment) facility, staff continue to work
with the design consultant on finalizing the project concept, with a goal of having the eligibility and justification
document ready to submit to the FAA by the end of the month. The next in-person meeting with the FAA on this
project is scheduled for August 10, 2026. Environmental review is anticipated to be complete by the end of
September, with full design expected to begin in early 2027.
ii) Update on Airport Operations
The annual FAA certification inspection was scheduled for the day following the meeting. The inspection
includes daytime review of the airfield, fueling systems, and ARFF equipment and response times, followed by a
nighttime inspection of airfield lighting and pavement markings. Digital records — including training records,
daily airfield inspection and work order logs, Notices to Airmen (NOTAMs), the wildlife hazard management
plan, and snow/ice control and emergency exercise documentation — were submitted in advance for the FAA's
review.
Staff also reported the resignation of one operations and maintenance technician (third shift), effective end of
the month; the position has been posted and recruitment is underway. Staff noted this is traditionally a difficult
shift to fill given the role's overnight hours and rotating weekend coverage requirements, and asked board
members to share the opening with any qualified candidates.
6. OVATION
A. Fixed Base Operator Report
Josh Harris of Ovation reported that a fly-in group of Cherokees to Oshkosh began arriving during the week
ahead of AirVenture Oshkosh, with approximately 40 aircraft expected; a social event for the group was
scheduled for that evening. Ovation's new air stairs have arrived and are fully in service. Fuel sales were up
approximately 11%.
7. NEXT SCHEDULED MEETING DATE
The next regular meeting of the Central Wisconsin Joint Airport Board is scheduled for:
Tuesday, August 11, 2026 | 8:00 a.m. | Central Wisconsin Airport
8. ADJOURNMENT
The meeting was adjourned. Board members were invited to tour the new General Aviation Terminal Building
following the meeting.
Minutes Submitted By: Sarah Thurs, Badging Coordinator, CWA
5
Central Wisconsin Airport – Flight Schedule
August 11, 2026
Arrivals – Delta
4982 15:42 from MSP CRJ-700
4934 21:19 from MSP CRJ-900
Departures – Delta
5384 07:01 to MSP CRJ-900
4982 16:24 to MSP CRJ-700
Arrivals – American
3412 09:24 from ORD E170
3409 16:10 from ORD E170
3741 23:56 from ORD E170
Departures – American
3474 06:00 to ORD E170
3412 09:54 to ORD E170
3409 16:40 to ORD E170
Arrivals – United
Service begins November 2027
Departures – United
Service begins November 2027
MSP = Minneapolis
ORD = Chicago O’Hare
Total CWA Flights Daily = 5
Upcoming Charter Schedule
• August 3 – Sun Country to Ceasar’s / Omaha
• September 26 – Sun Country to Riverside / Laughlin
6
CWA Legislative Update – August 2026
House Passes Measure to Fund Government Through December 4
(Source: Aviation News Today, AAAE)
July 22, 2026
The House of Representatives late yesterday passed a “clean” continuing resolution (CR) that would
provide federal funding through December 4 — a month beyond the November mid-term elections.
The vote on the temporary funding bill — which is free from extraneous provisions and would simply
extend current funding from October 1 through December 4 — was 220 to 205.
Senate Majority Leader John Thune (R-SD) indicated that he intends to schedule a vote on the CR before
the Senate adjourns for the August recess early next month. Thune also indicated that he intends to
consider adding a package of funding “anomalies” that the White House has requested be included
along with the funding extension.
During consideration of the CR, DOT/FAA funding subcommittee Chair Steve Womack (R-AR) noted the
impact of previous shutdowns on the aviation system. He and others urged adoption of the temporary
funding measure to keep the government open and operational beyond November’s mid-term
elections.
7
Agenda Item Summary
Airport Board Meeting Date: August 11, 2026
Agenda Item Title: #4) Presentation - ARFF/SRE Facility Preliminary Design Update
Staff Responsible: Mark Cihlar, Assistant Airport Director
Background: During the March 10, 2026 Joint Airport Board Meeting, the Board approved a preliminary design contract
with the Airport’s on-call architect, Woolpert, to being the design effort for a new ARFF/SRE Facility Project. The new
facility will replace the airport’s current facility in the same location. This facility houses CWA’s Aircraft Rescue Fire
Fighting (ARFF) apparatus and Snow Removal Equipment (SRE) for both airside and landside snow removal. The facility
also serves as the Operations facility for the majority of Airport staff. This project was one of the focus areas of the 2023
Terminal Area Master Plan (TAMP).
Since the start of the preliminary design effort, significant progress has been made on the project. Efforts have been
focused around the following deliverables:
- Verify and refine the concept developed during the 2023 TAMP
- Completing all environmental analysis for FAA approval
- Preparing an eligibility analysis based on intended use and FAA funding regulations
- Developing a preliminary site layout
- Establishing a continuity of operations plan for ARFF and SRE functions during construction
The preliminary design effort has included close coordination with the FAA Airport’s District Office (ADO) in Chicago and
the Wisconsin DOT Bureau of Aeronautics. Airport Staff, Woolpert, and Becher Hoppe (sub-consultant to Woolpert on
the project) have met twice with the ADO, once in April and once in June, with a third meeting scheduled on August 10,
and a final preliminary design meeting scheduled on November 2, 2026. Extensive FAA and BOA coordination will
continue through lifecycle of the project.
The Design Team will be giving the Board an update on the project, including status of each deliverable.
Timeline: The preliminary design effort is on schedule with essential FAA reviews and approvals expected before the end
of the year. After the preliminary design, Airport Staff anticipate negotiating a full-design contract with Woolpert in early
2027, and having the project ready for grants during the FAA’s FY2027 and FY2028 grant cycles.
Financial Impact: The current estimate for the total project cost is $25.7M. This estimate is based on the 2023 TAMP and
recent project bid prices. After Federal and State funding, CWA’s local share of the project is currently estimated at
$3.25M, which will be able to be paid by a combination of Passenger Facility Charge (PFC) funding (~$1.1M) and airport
funds (~$2.1M). A detailed project financial summary will be provided at the next board meeting prior to the 2026 Joint-
Finance Committee meeting.
8
Agenda Item Summary
Contributions to Airport Goals: This project is continuing the execution of the 2023 Terminal Area Master Plan,
supporting the 2026 Annual Goal to Develop Plan for Future Growth, and is positioning the airport to maintain a high
level of safety and operational readiness in our 24/7 operation for Airport Rescue Fire Fighting and Snow Removal
operations.
Recommended Action: No action is being requested. This item is for informational purposes only.
Attachments: Eligibility Exhibit and Preliminary Site Layout
9
3348 SF
ARFF BAYS
121
150 SF
HOSE DRY
122
200 SF
SCBA
123
195 SF
GEAR WASH
111
100 SF
RESTROOM
101
73 SF
WC
107
71 SF
WC
108
100 SF
RESTROOM
102
100 SF
RESTROOM
103
256 SF
LOCKER
104
150 SF
MED DECON
125
119 SF
FIRST AID
124
249 SF
TRAINING
113
161 SF
OPS SUPERVISOR
116
160 SF
OPS SUPERVISOR
115
200 SF
MECH OFFICE
114
99 SF
VEST
106
6083 SF
SRE DRIVE-THRU LANE 1
135
6932 SF
SRE EQUIPMENT STORAGE
134
6404 SF
SRE DRIVE-THRU LANE 2
136
920 SF
ELECTRICAL VAULT
100
558 SF
SAND STORAGE
133
173 SF
MECH
105
191 SF
TURNOUT
112
37 SF
JAN. CLOSET
110
ELIGIBLE NON-ELIGIBLE
1043 SF
CORRIDOR
109
20/20B SNOW
PLOW / RW
BROOM
22/22P RAMP PLOW
LOADER/PLOW
21/21B SNOW
PLOW / RW
BROOM
18
E-36
24 RAMP PLOW
LOADER
23 SAND LOADER
12/25 SNOW BLOWER /
BLOWER LOADER
16 SAND
14 SAND
15 NAC
R2 ARFFR1 ARFF
26 SPILL
TRAILER
325 SF
SALT
126
342 SF
SRE PARTS STORAGE
132
300 SF
USED OIL
128
200 SF
OIL STORAGE
129
359 SF
DE-ICE
137388 SF
KITCHEN
120
128 SF
DAY ROOM
117
100 SF
OPEN SPACE FOR SHIFT
COMMANDER
118
128 SF
WATCH ROOM
119
4802 SF
SRE STORAGE
127
PRO-RATED
455 SF
BROOM/PLOW STORAGE
131
11 SNOW BLOWER
4 CFME
7 CWA F-350
19/19B
SNOW PLOW/BROOM
1723 SF
ARFF
MAINTENANCE/SUPPORT
SPACE
130
NOT FOR CONSTRUCTIONPRELIMINARY
CENTRAL WISCONSIN AIRPORT
ARFF & SRE FIRST FLOOR PLAN
- ELIGIBILITY PLAN
1ST FLOOR ELIGIBLE SPACE
ARFF L1 TOTAL AREA FOOTPRINT = 38,609 SF
L1 TOTAL ELIGIBLE AREA = 36,843 SF
L1 ELIGIBILITY = 95.426%
TOTAL AREA FOOTPRINT (L1) = 38,609 SF
TOTAL AREA FOOTPRINT (L2) = 4,767 SF
OVERALL TOTAL ELIGIBLE AREA = 36,843 SF
OVERALL NON-ELIGIBILITY = 1,766 SF
OVERALL PRO-RATED = 4,940 SF AT 95.426%
ELIGIBILITY TOTAL% = 95.426%
ELIGIBILITY BUILDING TOTAL
N
MULTI-
PURPOSE
ARFF/SRE
PRO-RATED
SRE
10
124 SF
IT ROOM
203
ELIGIBLE NON-ELIGIBLE
3209 SF (L1) =
1604 MAX WEST
MEZZANINE (L2)
WEST MEZZ. = 1601 SF.
6130 SF (L1) =
3065 SF MAX EAST MEZZANINE
(L2)
EAST MEZZ. + PLATFORM =
3041 SF.
PRO-RATED
2122 SF
EAST MEZZANINE
201
785 SF
PLATFORM
200
1601 SF
WEST MEZZANINE
202
OPEN TO BELOW
AHU
NOT FOR CONSTRUCTIONPRELIMINARY
CENTRAL WISCONSIN AIRPORT
ARFF & SRE MEZZANINE FLOOR
PLAN - ELIGIBILITY PLAN
MEZZANINE FLOOR ELIGIBLE SPACE
L2 TOTAL AREA FOOTPRINT = 4,767 SF
L2 TOTAL ELIGIBLE AREA = 4,548 SF
L2 ELIGIBILITY = 95.426%
N
PRO-RATED
11
TAXILANE 3TAXILANE 2TAXILANE 1
GENERAL AVIATION APRON
HANGAR
ATCT
COMMERCIAL SERVICE APRON
CONCOURSE
TERMINAL
CWA DRIVE
T-HANGAR
T-HANGAR
PROPOSED ARFF-SRE BUILDING
EXISTING GENERATOR
TO BE RELOCATED
RENTAL CAR FACILITY
RELOCATED GENERATOR
PROPOSED SECURITY FENCE (TYP)
GATE A
PROPOSED ACCESS ROAD
GATE B
PROPOSED LANDSIDE SRE ACCESS
CONCRETE PAVEMENT RECONSTRUCTION
ASPHALT PAVEMENT RECONSTRUCTION
PROPOSED SIDEWALK (TYP)
PROPOSED GREEN SPACE (TYP)
0 PRELIMINARY SITE PLANKEH
50' 100'
NONE NONE
330 N. 4th STREET
WAUSAU, WI 54403 715.845.8000
becherhoppe.com
FILE NAME:
PLOT TIME:
LAYOUT:
Copyright , Becher-Hoppe Assoc. Inc.C
DRAWN BY:
CHECKED BY:
DATE: REV. DATES:
PROJECT NO: SCALE
SHEETBECHER HOPPE
CENTRAL WISCONSIN AIRPORT
ARFF-SRE BUILDING
CWA10##
2026.004
AUG 2026
KRK
2023 P:\2026\2026.005 - Woolpert - CWA ARFF-SRE Building\CAD\Exhibits\26005 - CWA ARFF-SRE Preliminary Site Layout Exhibit.dwg
8/4/2026 5:20 AM
1
1
12
CENTRAL WISCONSIN AIRPORT STATISTICAL REPORT `
SUMMARY - JUNE 2025 - 2026
30-Jul-26
2025 2026 % CHGE. 2025 2026 % CHGE.
MONTH MONTH 25-26 Y-T-D Y-T-D 25-26
ACTUAL LANDINGS
AMERICAN 82 89 8.5% 448 456 1.8%
DELTA 60 61 1.7% 367 363 -1.1%
CHARTERS 1 1 0.0% 8 8 0.0%
TOTAL OPERATIONS 286 302 5.6% 1,646 1,654 0.5%
ATCT OPERATIONS 847 1,068 26.1% 4,926 5,484 11.3%
AIRLINE CANCELLATIONS
AMERICAN 0 3 100.0% 7 19 171.4%
DELTA 0 0 0.0% 3 4 33.3%
TOTAL CANCELLATIONS 0 3 100.0% 10 23 130.0%
ENPLANED PASSENGERS
AMERICAN 3,655 3,957 8.3% 18,232 21,156 16.0%
DELTA 3,603 3,464 -3.9% 20,118 21,042 4.6%
CHARTERS 85 189 122.4% 1,025 1,203 17.4%
TOTAL ENPLANED PASSENGERS 7,343 7,610 3.6% 39,375 43,401 10.2%
DEPLANED PASSENGERS
AMERICAN 3,691 4,133 12.0% 18,188 20,920 15.0%
DELTA 3,819 3,821 0.1% 19,912 21,115 6.0%
CHARTERS 85 189 122.4% 1,025 1,203 17.4%
TOTAL DEPLANED PASSENGERS 7,595 8,143 7.2% 39,125 43,238 10.5%
AIR FREIGHT - AMERICAN 50 200 300.0% 155 587 278.7%
AIR FREIGHT - DELTA 0 0 0.0% 0 0 0.0%
TOTAL AIRFREIGHT - AIRLINES 50 200 300.0% 155 587 278.7%
TOTAL AIRFREIGHT - GENERAL AVIATION 122,860 115,491 -6.0% 751,641 726,052 -3.4%
AIRLINES & GEN AVIATION - AIRFREIGHT 122,910 115,691 -5.9% 751,796 726,639 -3.3%
LOAD FACTOR-CURRENT MONTH SEATS PAX FACTOR
AMERICAN 5,634 3,957 70.2%
DELTA 4,427 3,464 78.2%
13
FIN - Budget vs Actual for Organization
Company County of Marathon
Organization Cost Center: 53510 CWA Operations
Period FY2026 - July
Ledger Account Budget Actuals (Current Period) Actuals (YTD) Budget Remaining Budget Used (%) Actuals (PY Current
Period)
Actuals (PY YTD)
Revenues
Federal Grants 0 0 0 0 8,248
Parking Fees 1,150,000 68,879 637,184 68,940 556,525
Airport Fees 2,373,000 187,402 1,520,705 318,944 1,545,093
Other Public Charges for Services-Advertising 60,000 26,082 47,717 15,691 51,794
Local Departments 0 1,195 1,195 0 0
Interest on Investments 45,000 0 36,626 7,013 144,481
Property Sales 0 0 39,722 0 32,307
Other Miscellaneous Revenues 100,000 58 258 0 0
Transfer In from Other Funds 398,205 0 0 0 0
Gain/Loss Sales of Fixed Assets 490,000 0 0 0 0
Total Revenues 4,616,205 283,616 2,283,407 2,332,798 49.47% 410,587 2,338,447
Expenditures
Personnel 2,153,029 166,525 1,189,574 963,455 55.25% 149,359 1,040,526
Salaries and Wages 115,491 829,607
Employee Benefits 505 7,657
Employer Contributions 50,528 352,310
Contractual Services 966,500 48,659 473,420 493,080 48.98% 56,270 512,815
Professional Services 11,269 160,552
Utility Services 27,055 182,540
Repair and Maintenance Services - Other 708 48,356
Special Services - IT 8,624 74,061
Other Contractual Services 1,003 7,911
Materials and Supplies 513,500 18,028 334,313 179,187 65.10% 40,032 237,960
Office Supplies 12,098 18,367
Publications, Subscriptions and Dues 2,060 19,505
Travel 140 5,921
Operating Supplies 3,023 22,186
Repair and Maintenance Supplies 0 102,457
Other Repairs and Maintenance Supplies 304 26,293
Other Supplies and Expense 403 139,585
Building Materials 38,000 5,953 9,550 28,450 25.13% 14,420 39,322
Concrete and Clay Products 0 0
Metal Products 16 485
Wood Products 0 1,450
Raw Materials 2,362 3,971
Electrical Fixtures and Small Appliances 3,159 3,159
Fabricated Materials 417 486
Fixed Charges 120,000 0 26,919 93,081 22.43% 158 28,613
Insurance 0 26,248
Other Permits and Regulatory Fees 0 671
Rents and Leases 0 0
Capital Outlay 380,000 0 124,022 255,978 32.64% 9,832 536,007
Debt Service 445,176 0 30,381 414,795 6.82% 0 0
Total Expenditures 4,616,205 239,165 2,188,180 2,428,025 47.40% 270,071 2,395,243
Net Change 44,451 95,227 140,516 (56,797)
14