Agenda and Packet
City of River Falls · Pierce County · meeting of Jul 14, 2026 · Agenda packets
Open the original document More from City of River Falls
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
COMMON COUNCIL AGENDA
July 14, 2026
The public may view/listen to the meeting by:
• Calling Toll Free 1-844-992-4726, access code: 2634 284 2088
• Visiting the web link: https://tinyurl.com/RFCC071426
• Viewing the City's YouTube Channel: https://www.youtube.com/user/cityofriverfalls
Call Meeting to Order – 6:30 p.m.
Pledge of Allegiance
Roll Call
Approval of Minutes – June 23, 2026 Council Meeting, Merchant McIntyre Workshop
Approval of Bills: $
PUBLIC COMMENT, PETITIONS, REQUESTS AND COMMUNICATIONS
1. Public Comment
If you are unable to attend the meeting in person but would like to submit a comment, please
e-mail to the City Clerk’s office (awhite@rfcity.org).
PUBLIC HEARING
2. Second Reading Ordinance 2026- 13, An ordinance amending Title 17 – Zoning, Chapter 17.124
(Regulations for the Protection of Wetlands Within the Shoreland)
3. Second Reading Ordinance 2026-14 An ordinance amending Title 10 – Vehicles and Traffic: Creating
Chapter 10.21 relating to electric bicycles and electric scooters
CONSENT AGENDA
4. Resolution Creating Ward 19 and Correcting the Ward Designation for the Territory Annexed by Ordinance
No. 2026-12
5. Resolution Approving Merchant McIntyre & Associates, LLC 2026-2027 Agreement
6. Resolution approving the purchase of 29 new computer workstations from CDW-G
ANNOUNCMENTS
7. Mayor’s Appointments
REPORTS
8. Administrator Report
9. Comptroller Report
10. Mayor’s Good News
CLOSED SESSION
11. Recess into Closed Session per Wisconsin State Statutes §19.85(1)(e) for the following purposes:
“deliberating or negotiating the purchasing of public properties, the investing of public funds, or conducting
other specified public business, whenever competitive or bargaining reasons require a closed session, to
wit: Property located at 404 S. Winter Street
RECONVENE INTO OPEN SESSION:
12. Act on Closed Session Items if necessary
ADJOURNMENT
NOTE: Any person who has a qualifying disabilit y accommodation the Americans with Disabilities Act that
requires the meeting or materials to be in an accessible location or format, may contact City Clerk Amy White at
(715) 426-3408 or in person at 222 Lewis Street, for accommodations. Requests for accommodation should be
made at least three (3) business days in advance of the meeting. Every effort will be made to arrange
accommodation.
Posted at City Hall, Police Department and Library on 7/8/26; Publish: The Pierce County Journal: 07/8/26 Website: 07/8/26
CITY OF RIVER FALLS, WISCONSIN
COMMON COUNCIL PROCEEDINGS
June 23, 2026
Mayor Page called the meeting to order at 6:30 p.m.
City Council Members Present: Mei Mei Abdouch, Todd Bjerstedt, Nick Carow, Sean Downing, Diane
Odeen, Michael Page, Rose Walker
Staff Present: City Administrator Scot Simpson; Community Services Director/City Clerk Amy White ;
City Attorney Chris Gierhart; Police Chief Gordon Young; Chief of Staff Jennifer Smith ; City Engineer
Todd Nickleski; Utility Director Kevin Westhuis; Finance Director Josh Solinger, Economic Development
Manager Keri Schreiner; Sergeant Denton Anderson; Senior Civil Engineer Chris Buntjer; IT Technician
Jonathan Thoen
The pledge of allegiance was said.
APPROVAL OF MINUTES:
June 9, 2026 meeting minutes
MS Odeen/Carow to approve the minutes.
Councilmember Walker noted one correction to the name of a speaker during public hearing. Minutes
were updated by Clerk White
Motion passed unanimously.
APPROVAL OF BILLS:
MSC Walker/Bjerstedt moved to approve the bills. Unanimous.
PUBLIC COMMENT, PETITIONS, REQUESTS AND COMMUNICATIONS:
William Hansen – Hansen commented on the impacts of the City's decision to drain Lake Louise
following the 2020 flooding event, expressing concerns about environmental effects and the loss of
hydroelectric power generation. He encouraged the Council to consider these factors in future decisions
regarding the Junction Falls Dam and Lake George.
Dana Linscott – Linscott provided an update on the organization's efforts to assist individuals
experiencing housing instability. He emphasized the need for additional affordable and subsidized
housing and expressed interest in beginning discussions with the City to explore potential housing
solutions and identify feasible next steps.
Cameron Nelson – Nelson commented on the display of the Pride flag at City Hall. He expressed
concern that, while intended to promote inclusion, the display may make some members of the religious
community feel excluded. He encouraged the City to display only the United States, W isconsin, and
River Falls flags at City Hall as symbols of unity.
PUBLIC HEARING:
Annual Liquor License and Beer License Renewals – Hearing and Disposition by Motion for each
License Class
Clerk White confirmed the attendance of the agent.
City Council Minutes for June 23, 2026
Page 2
At 6:38 p.m., the mayor recessed into a Public Hearing asking if anyone had comments about
the license renewal s. As there were no questions or comments, the mayor moved back into
Open Session at 6:39 p.m.
MSC Odeen/Bjerstedt move to grant renewals for the Combination “Class A” Liquor and Class
“A” Beer Licenses contingent that all licensing requirements are met at the time of issuance for
Kwik Trip Stores #453. Unanimous.
Mayor Page opened the public hearing at 6:40 p.m. First Reading Ordinance 2026-13, An ordinance
amending Title 17 – Zoning, Chapter 17.124 (Regulations for the Protection of Wetlands Within the
Shoreland)
Senior Civil Engineer Chris Buntjer provided a presentation to Council.
Staff clarified that the proposed ordinance changes would not alter wetland permitting requirements for
either private developers or City projects. All projects impacting wetlands would continue to be subject
to the same review and permitting process throu gh the Wisconsin Department of Natural Resources,
with the ordinance aligning local regulations with existing state requirements.
Mayor Page closed the public hearing and reopened the council meeting at 6:45 p.m.
Councilmember Downing asked why the City chose to extend the wetland ordinance citywide rather
than only to targeted wetlands. Senior Civil Engineer Bunger explained that the Wisconsin DNR
identified the City's ordinance as not being as stringent as state regulations because it did not apply to
all wetlands. The proposed amendments address that deficiency by extending the ordinance citywide.
Councilmember Walker requested clarification on the difference between a shoreland zone and a
wetland, as well as the meaning of impervious surfaces. Bunger explained that the shoreland zone
generally applies to areas adjacent to the Kinnickinnic River, while the amendments would apply
wetland buffer requirements to all wetlands in the City. He noted that impervious surfaces include roads,
buildings, and other hard surfaces that are restricted within wetland buffer areas.
Councilmember Walker further asked whether the amendments created new requirements for
developers. Administrator Simpson explained that developers are already required to comply with DNR
wetland regulations. The ordinance amendments simply incorporate those existing state requirements
into the City's code, allowing the City to review and enforce compliance without creating additional
regulatory requirements.
Councilmember Odeen asked how future changes to DNR regulations would affect the City's ordinance.
Administrator Simpson explained that incorporating state language into the City's ordinance could
require future amendments if state regulations change, as the City could otherwise become either more
or less restrictive than the state.
Councilmember Abdouch asked whether the ordinance could automatically follow future state
regulatory changes or require more restrictive standards. City Attorney Gierhart responded that either
approach could be adopted as a policy decision. Council discussed the possibility of amending the
ordinance at the second reading to ensure the City's standards would remain at least as restrictive as
future state regulations.
Mayor Page opened the public hearing at 6:59 p.m. First Reading Ordinance 2026-14 An ordinance
amending Title 10 – Vehicles and Traffic: Creating Chapter 10.21 relating to electric bicycles and electric
scooters.
Mayor Page closed the public hearing and reopened the council meeting at 7:00 p.m.
City Council Minutes for June 23, 2026
Page 3
Councilmem ber Downing asked whether the City should consider future requirements for identifying
electric bicycle classes and how modified bicycles would be addressed. Council member Odee n
explained that state law requires Class 1, 2, and 3 e- bikes to display a classification sticker.
Administrator Simpson noted that the ordinance primarily references state statutes while relying on
officer discretion for enforcement.
Co
uncilmember B jerstedt asked whether similar ordinances had been implemented successfully
elsewhere. Administrator Simpson responded that many municipalities have recently adopted similar
regulations, but because e- bike and scooter regulations are relatively new, there is limited long- term
experience. He introduced Sergeant Anderson, who coordinated development of the ordinance.
Co
uncilmember Abdouch asked how the City would educate the public about the new ordinance.
Sergeant Anderson stated that the Police Department would work with City staff to develop educational
materials through the City's communication channels. Council also discussed the poss ibility of future
signage reminding trail users to yield to pedestrians.
Co
uncilmember Page raised concerns about ambiguous reflector size requirements in the ordinance
and questioned whether compliant reflectors were readily available. Sergeant Anderson, Matt Johnson
(The Garage Bikes + Brews), and staff agreed the language should be clarified to reflect available
products and avoid creating unintended compliance issues.
CO
NSENT AGENDA
Acknowledgment of the following minutes : BID Board (5/12/26) →→pulled by Abdouch; Police and
Fire Commission (1/5/26); Park and Recreation Advisory Board (5/20/26) ; Plan Commission (5/5/26);
Utility Advisory Board (4/20/26; 5/18/26)
Resolution No. 7090 Approving the River Falls Public Library Furniture Purchase Contract
Resolution No. 7091 Approving the River Falls Public Library Construction Contract for the Solarium,
Lower-Level Technology and Community Room Glass Wall Surround
Resolution No. 7092 Approving Wastewater Treatment Plant 2025 Compliance Maintenance Annual
Report
Resolution No. 7093 Approving 2026 Directional Boring Contract
Resolution Approving Purchase of Paulson Road Street Lights→→pulled by Carow
Resolution No. 7094 Approving Community Arts Based Request for Noise Control Exemption for Art on
the Kinni
Resolution No. 7095 Approving Community Arts Based Request for City Assistance for Art on the Kinni
M
SC Odeen/Carow to approve the remainder of the Consent Agenda. Unanimous.
A
cknowledgment of the following minutes: BID Board (5/12/26)
Councilmember Abdouch indicated she has specific questions regarding the minutes. She was advised
to reach out to the Board for clarification.
MSC Abdouch/Odeen to acknowledge the minutes. Unanimous.
Re
solution No. 7096 Approving Purchase of Paulson Road Street Lights.
Councilmember Carow asked staff whether the proposed light fixtures had been used elsewhere in the
City and inquired about their performance and warranty. Utility Director Westhuis responded that the
same fixtures are installed along Cascade Avenue and at the Paulson Road roundabout, where they
have performed well with no reported complaints. He confirmed the fixtures include a standard five-year
warranty.
MSC Carow/Page to approve the resolution. Unanimous.
ANNO
UNCEMENTS:
Mayor’s Appointments
Mayor Page appointed Joel Donna and Lance Hovland to the Utility Advisory Board
City Council Minutes for June 23, 2026
Page 4
MCS Odeen/Carow to approve the appointments. Unanimous.
Parks and Recreation Proclamation
Councilmember Downing read the proclamation
REPORTS:
Administrator’s Report
No questions for Administrator Simpson
Mayor’s Good News
Mayor Page thanked everyone who attended the recent Cookout Conversation, noting the strong
community turnout and the park's continued success. She announced the next Cookout Conversation
will be held on July 16 at Hoffman Park and reminded residents that River Falls Days will take place
July 9–12, with the parade on July 10 and the theme "Christmas in July."
CLOSED SESSION
At 7:28 p.m., MS Downing/Carow move to Recess into Closed Session per Wisconsin State
Statutes §19.85(1)(e) for the following purposes: “deliberating or negotiating the purchasing of
public properties, the investing of public funds, or conducting other specified public business,
whenever competitive or bargaining reasons require a closed session, to wit: 1091 Sutherland Ave
and property with Parcel ID 276-01060-0100”. Mayor asked for a roll call vote which passed 7-0 .
RECONVENE INTO OPEN SESSION
At 9:05pm, MSC Odeen/Abdouch to move back into Open Session. Unanimous.
MSC Bjerstedt/Walker to adjourn at 9:06 p.m. Unanimous.
Respectfully submitted,
Amy White, Community Services Director/City Clerk
MERCHANT MCINTYRE FEDERAL FUNDING WORKSHOP
June 9, 2026
City Hall – Council Chambers
Councilmembers Present: Mayor Alison Page, Sean Downing, Diane Odeen, Rose
Walker, Michael Page, Todd Bjerstedt, Mei Mei Abdouch Absent: Nick Carrow
City Staff Present: City Administrator Scot Simpson, IT Specialist Jon S mits,
Community Services Director/City Clerk Amy White, Chief of Staff Jennifer Smith,
Assistant to the City Administrator Jason Rohloff, Community Development Director Am y
Peterson, Office Support Specialist Brenda Randleman, Police Chief Gordon Young, City
Engineer Todd Nickleski, Assistant Director of Community Development Emily Shively, Utility
Director Kevin Westhuis
Presenters: Associates from Merchant Mcintyre Tristan Southard and Fiona McLeod
Mayor Alison Page opened the workshop at 5:30 p.m.
City Administrator Scot Simpson introduced the two presenters from Merchant McIntyre – Vice
President Tristan Southard and Government Relations Associate Fiona McLeod. Southard
explained that Merchant McIntyre has been assisting the City of River Falls with identifying and
securing federal funding applicable to the City’s priorities since December 2022. Southard then
outlined the workshop agenda: Situation Analysis in Washington D.C.; Federal Funding Strategy
Overview; and Strategy Discussion with Question & Answer session.
Merchant McIntyre Associates presented an update on the City's federal funding strategy,
focusing on surface transportation, public safety, economic development, and the Kinnickinnic
River Corridor.
Southard reviewed the partnership's
results to date, including more than $6.16 million secured
and over $50 million in pending grant requests. Current applications for the Main Street project
were summarized, including a $24 million BUILD Grant request and a $21.9 million Safe
Streets and Roads for All (SS4A) Implementation Grant request. Expected award timelines are
anticipated later in 2026.
Southard explained that the surface transportation funding strategy is centered primarily on
two federal programs: the Safe Streets and Roads for All (SS4A) Grant Program and the
Better Utilizing Investments to Leverage Development (BUILD) Grant Program.
Implementation of the SS4A Grant Program is planned for late 2026. Southard noted that the
Council Workshop Minutes
June 9, 2026
Page 2
BUILD Grant Program provides both planning and implementation grants for transformative
surface transportation projects with significant local or regional impact, with award amounts
capped at $25 million. The BUILD program remains a primary funding vehicle for the Main
Street Project. Staff and consultants will continue to track ongoing applications and deadlines
for federal funding opportunities to ensure timely submissions.
Discussion then centered on the Kinnickinnic River Corridor project. Council reviewed the
completed feasibility phase, the request for $1.85 million in Congressional Directed Spending
for project cooperation and early design, and the likely local match requirements. It was noted
that the federal funding cap had increased from $10 million to $15 million; however, the City
would still likely need to assemble approximately $6 million to $7 million in local or state-
supported funding to complete the project. The discussion emphasized that once a Project
Cooperation Agreement is signed, the U.S. Army Corps of Engineers would control project
timing, contractor selection, and construction phasing.
Council discussed the importance of maintaining communication with congressional
representatives regarding funding requests and appropriations for the Kinnickinnic River
Corridor project. Continued engagement with the Wisconsin Department of Natural Resources
(DNR) was also encouraged to explore potential funding opportunities for dam removal and to
clarify whether grant funds may be used to satisfy local match requirements.
Additional updates were provided by McLeod regarding public safety and economic
development initiatives. The City has secured $430,000 in FY26 Congressional Directed
Spending for police portable radio equipment and $1.4 million in FY24 funding for fire station
renovations. Staff and consultants continue to monitor opportunities related to a regional
dispatch center, including potential federal and state funding sources for a feasibility study.
Additional grant opportunities are also being explored for fire station renovations through the
National Endowment for the Arts (NEA) Grants for Arts Program and for a Water Tender
through FEMA's Assistance to Firefighters Grant (AFG) Program.
Economic development efforts remain focused on identifying and pursuing additional grant
opportunities to support small businesses in conjunction with downtown redevelopment
projects. Staff will continue to monitor available funding programs and resources that can
strengthen downtown business growth and revitalization efforts.
Abdouch questioned whether affordable housing grants or funding opportunities were
available. Southard discussed the challenges facing housing development nationwide and
noted that direct federal housing funding opportunities remain limited, with stronger prospects
currently available at the state level. The discussion highlighted a strategy of pursuing
infrastructure-related grants, including water and sewer improvement funding, that could
indirectly support housing affordability and future development. Staff will continue monitoring
federal and state grant opportunities related to affordable housing and will remain attentive to
HUD and Rural Development housing assistance programs that may benefit the Housing
Authority.
Council Workshop Minutes
June 9, 2026
Page 3
Council comments reflected support for maintaining focus on the City's major priorities,
particularly the Main Street Project and Kinnickinnic River Corridor initiatives, while recognizing
the lengthy timelines and complexity associated with federal funding partnerships. Council also
discussed the importance of maintaining a strong working relationship with Merchant McIntyre
Associates and continuing communication regarding long-term projects, funding strategies,
and anticipated timelines.
Additional discussion included consideration of whether hiring a state lobbyist could enhance
the City's ability to secure state funding opportunities and legislative support for local
government projects. Council also noted community concerns regarding road maintenance
needs and potential traffic increases associated with annexation and future development,
emphasizing the importance of continued monitoring and planning to address these issues.
Mayor Page adjourned the workshop at 5:57 p.m.
Respectfully submitted,
Brenda Randleman, Office Support Specialist
2
MEMORANDUM
TO: Mayor Page and City Council
FROM: Chris Buntjer, Senior Civil Engineer
DATE: July 14, 2026
TITLE: CHAPTER 17.124 – REGULATIONS FOR THE PROTECTION OF WETLANDS
WITHIN THE SHORELAND: PROPOSED CODE UPDATES – Second Reading
RECOMMENDED ACTIONS
Second reading and Disposition of the proposed o rdinance amendments to Chapter 17.124 –
Regulations for the protection of wetlands within the shoreland.
BACKGROUND
This memorandum outlines proposed code updates designed to bring the zoning code into
conformance with DNR regulations.
The City’s Municipal Separate Storm Sewer System ( MS4) program was audited by the DNR in
November of 2025 and the City received a “City of RF MS4 Audit Program Eval Summary” from
the DNR on February 10, 2026 (Attachment A). The document identifies 1 required action item
for the City to address:
“The ordinance or other regulatory mechanism shall establish or include new development
and infill, and post -construction performance standards equivalent to those in ss. NR
151.122 through 151.126 and 151.242 through 151.246, Wis. Adm. Code per Section (2.5.1
(c)).”
The DNR’s summary specifically calls out NR 151.125 and NR 151.245, which are “Protective
areas performance standards” for wetlands, outstanding and exceptional resource waters,
perennial and intermittent streams, and lakes.
The City’s MS4 permit from the DNR requires that the City’s stormwater and wetland ordinances
be at least as stringent as DNR regulations.
It appears that the City’s Wetland and Shoreland Protection ordinances (Ch. 17.124 & Ch. 17.128)
incorporate the requirements of NR 151, but only within the shoreland zone.
DISCUSSION
In order to address the DNR’s comment and satisfy State and Federal rules, the City needs to
revise its ordinances to require the establishment of protective areas (i.e., buffer areas). These
protective areas vary in width depending on the type and quality of surface water feature (i.e.,
wetland, lake, stream, etc.). Construction activity and impervious surfaces are not prohibited
within these protective areas, but must be justified withi n the narrative of the stormwater
management plan submitted to the DNR explaining why there is no practical alternative.
Memorandum to Mayor and City Council
July 14, 2026
Page 2
The proposed ordinance revisions are intended to revise the Wetland and Shoreland ordinances
in such a way that they apply to any delineated wetland areas (or other qualifying waters) within
the corporate limits of the City, and not just those within the s horeland zone. Additionally, the
proposed revisions will clearly specify the DNR’s required buffers for Protective Areas based on
type and quality.
The proposed updates include:
• Changing the Section Title Ch. 17.124.
• Revising the General Provisions section Ch. 17.124.010.C.1.a. to include all wetlands
within the City’s corporate limits.
• Adding the DNR’s definition of Protective Area to Ch. 17.124.020, which includes buffers
of varying widths depending on resource quality and type.
• Revising the Shoreland- wetland zoning district section in Ch. 17.124.030 to include all
wetlands within the City’s corporate limits.
• Adding requirements for the inclusion of impervious surfaces within Protective Areas to
the Shoreland-wetland zoning district section 17.124.030.
Projects with wetland impacts will still require DNR permits and be subject to the same
requirements, with additional help from City staff to ensure that projects comply with DNR
regulations.
ANALYSIS
Though staff have taken care to ensure that the recommended changes below address DNR
concerns, there is room for both qualitative and quantitative adjustments by City Council. The
proposed updates aim to bring City code into alignment with the requirements of its MS4 permit
and NR 151 and satisfy the action item from the DNR’s audit.
CONCLUSION
The proposed code updates are intended to incorporate all the elements of NR 151 that did not
appear to be present within Ch. 17.124. The City Attorney has reviewed the proposed
amendments for statutory compliance and ordinance formatting.
RECOMMENDATION
The Plan commission voted to recommend the City Council adopt the proposed ordinance
amendments at its June 2, 2026 meeting. Second reading and disposition of the proposed
ordinance amendments to Chapter 17.124 – Regulations for the protection of wetlands within the
shoreland is recommended.
February 10, 2026
Todd Nickleski
222 Lewis Street
Suite 224
River Falls WI 54022
Subject: City of River Falls MS4 Permit (FIN#31431) Program Evaluation Summary
Dear Mr. Nickleski:
On November 4th and 5th, 2025 Department of Natural Resources Stormwater staff met with City of River Falls
representatives to evaluate implementation of the city’s MS4 Permit Program. This evaluation was conducted
through the Department’s authority under Sections 4.12 - 4.13 of the permit. During the evaluation, areas of non-
compliance were noted as reflected in Table 1 of the enclosed summary. The “Required Actions” listed must be
fully implemented to comply with the permit. “Recommendations” are also made in the table and while not
necessarily required, they are items or practices that are hallmarks of a program successfully implementing the
permit. Please review this information carefully as it is intended to help the city address items of noncompliance
and inform the city’s internal processes and procedures to improve overall consistency and effectiveness of your
efforts to improve and protect the water quality of the resources that are one of the big reasons for the city’s
growth. The city is subject to the Lake St. Croix TMDL, approved by USEPA in August 2012. It should be noted
that the city is in the process of updating their compliance modeling.
Evaluation Participants:
Department Staff
Michelle Asher, Stormwater Specialist
Leanne Hinke, Stormwater Specialist
Teagan Wagner, Stormwater Engineer
City Staff
Todd Nickleski, City Engineer
Chris Buntjer, Senior Civil Engineer
Tyler Galde, Planning & Engineering Technician
Erica Ellefson, Public Works Manager
Please provide a written response within thirty (30) days of receipt of this letter addressing efforts on behalf of the
City to resolve any issues described in the summary and provide a proposed timeline.
Thank you for your cooperation with the Department’s Municipal Storm Water Management Program. The time,
effort, and patience of your staff extended to us before, during, and after the evaluation were greatly appreciated.
If you have any questions or concerns regarding this letter, please contact me at 715-829-5344 or
Michelle.Asher@Wisconsin.gov.
State of Wisconsin
DEPARTMENT OF NATURAL RESOURCES
1300 W. Clairemont Ave.
Eau Claire WI 54701
dnr.wi.gov
wisconsin.gov
Page 2
Sincerely,
Michelle Asher
Stormwater Specialist
Enclosure: 2025 City of River Falls MS4 Permit Program Evaluation Summary Report
CC: Leanne Hinke, DNR Stormwater Specialist
Teagan Wagner, DNR Stormwater Engineer
Chris Buntjer, City of River Falls Senior Civil Engineer
Tyler Galde, City of River Falls Planning & Engineering Technician
Erica Ellefson, City of River Falls Public Works Manager
Page 3
There are 37 permitted MS4s in the West Central Region. Programs were first developed in the west central
region in the 1990’s under Phase I permits in accordance with the Clean Water Act and Wisconsin’s delegated
NPDES permitting authority under EPA. Storm water runoff (rural and urban) contributes pollutants to streams
and lakes and causes impairments. Common pollutants of concern causing these impairments are metals, PAHs,
Total Suspended Solids (TSS) and phosphorus. Increases in impervious area, traffic volumes, development
density, and non-residential uses associated with urbanized areas contribute additional pollutant generation and
runoff. Municipal separate storm sewer systems convey this runoff, in many cases, directly without treatment to
surface waters. If a waterway is not impaired, it is expected that this program will sustain existing water quality in
the receiving resource. The purpose of the MS4 permit program is to bring awareness to potential causes of and
resolutions to urban runoff pollution and to minimize, with the ultimate goal of eliminating, pollution in runoff
discharged from the MS4. This is done by introducing enhanced storm water management planning,
implementing, and establishing measurable goals in what are typically already existing municipal operations. By
periodically inspecting these programs, the Department intends to accomplish three primary objectives:
1. Program Compliance - Determine compliance with the MS4 permit.
2. Program Consistency - Gain a better understanding of the written municipal procedures as it relates to
the permit and program implementation, both for the MS4 being inspected (MS4 benefit) and for
comparison against other programs statewide (DNR and MS4 benefit)
3. Program Efficacy - Improve operations to meet statewide water quality performance standards and
targets established in local water quality planning efforts.
The City of River Falls was first permitted in October of 2006 under the Department’s Storm Water Municipal
General Permit, WPDES Permit Number WI-S050075-01, and was reissued coverage under the general permit
(WPDES Permit Number WI-S050075-3) on February 10, 2022. The general permit can be referenced online at
Municipal storm water permit overview | | Wisconsin DNR.
The city’s MS4 discharges to Kinnickinnic Watershed, Kinnickinnic River, and South Fork of the Kinnickinnic
River, Rocky Run, St. Croix River, and connected unnamed tributaries. The Kinnickinnic and St. Croix Rivers
are designated waters listed by the State as Area of Special Natural Resource Interest (ASNRI) for supporting
endangered and threatened species. Upstream and downstream of the city limits, the Kinnickinnic River are listed
as a Class I trout stream. Class I streams are high quality trout waters that have sufficient natural reproduction to
sustain populations of wild trout, at or near carry capacity capable of supporting natural reproduction. The city is
subject to the Lake St. Croix TMDL, approved by USEPA in August 2012. It should be noted that the city is in
the process of updating their compliance modeling.
As part of the audit, the Department reviewed the city’s existing legal authorities (ordinances), procedures for
Illicit Discharge Detection and Elimination (IDDE) dry-weather field screening and response, procedures for
construction site inspection and enforcement, public works yard Storm Water Pollution Prevention Planning
(SWPPP), the MS4 map, and the 2025 MS4 Annual Report. These procedures were discussed specifically with
the city staff implementing them. The purpose of this discussion was to:
1. Eliminate any inconsistencies between documented procedures and program implementation.
2. Identify areas where program implementation is deficient in meeting the minimum permit
requirements.
3. Identify areas where the city is improving or excelling at MS4 program implementation.
4. Clear up any concerns or questions regarding a permit requirement, purpose and intent, and
implementation.
Page 4
OVERALL PROGRAM MANAGEMENT
The MS4 program is managed by several staff working in the Engineering and Public Works Departments for the
City of River Falls. Many of the MS4 goals are reported, documented, and well organized through ArcGIS Field
Maps and Survey 123 platforms, which allow staff to effectively identify and track construction, maintenance,
and facility operations.
PUBLIC EDUCATION AND OUTREACH/PUBLIC INVOLVEMENT AND PARTICIPATION – MS4
GP SECTION 2.1-2.2
The city has a number of public education and outreach programs that address storm water, as required by the
MS4 permit. Outreach includes Earth Fest, held at the University of Wisconsin River Falls (UWRF) annually on
Earth Day, storm drain stenciling by local high school students, river clean-up events, and a rain barrel
reimbursement program. The city’s website https://rfmu.org/251/Storm-Water has a page dedicated storm water
management, and how it relates to water quality. It includes links to storm water projects previously mentioned as
well as other educational/ involvement and information regarding the MS4 permit, along with appropriate city
staff contacts.
The city is also a member of the regional stormwater consortium, Rain to Rivers of Western Wisconsin (R2R)
(https://www.raintorivers.org/), a partnership comprised of several local and county governments that hold MS4
permits and also utilize the group to help fulfill the Public Education and Outreach permit conditions. The
consortium provides educational information on all eight topic areas described in Section 2.1.1, Table 1 of the
MS4 General Permit through radio advertisements, billboards, and other ad space to educate the public on storm
water related issues. R2R also attends various municipal fairs and conferences with a booth manned with a
member representative and educational games. R2R members also host and attend various summits, conferences,
and meetings in the area.
The city also covers many of these topics through their own means, in addition to their involvement in R2R.
Stormwater messages specific to several topics have been developed. The City’s web page has information on the
Adopt a Pond program, IDDE, what is in stormwater runoff, and fertilizers. Stormwater signs, pet waste
dispensers, and receptacles are located in many of the city’s parks. The City has conversations with
developers/project managers explaining their “why” behind their stormwater requirements, such as installing
construction Best Management Practices (BMPs), and protecting environmentally sensitive areas within project
areas. The city also streams annual MS4 report presentations at council meetings on their YouTube page
https://www.youtube.com/user/cityofriverfalls.
Currently, the effectiveness of outreach activities is not tracked but is noticed by how many ponds are being
adopted. Also, construction inspections are improving, and the City is finding less issues and issues are corrected
more promptly.
Page 5
ILLICIT DISCHARGE DETECTION AND ELIMINATION (IDDE) PROGRAM – MS4 GP SECTION
2.3
The City’s Illicit Discharge Detection and Elimination (IDDE) program is implemented by the Engineering and
Public Works Departments. The IDDE ordinance was last updated in 2007 and prohibits illicit discharges and
provides exemptions for certain non-stormwater discharges, such as firefighting, car washing, and irrigation,
found within Chapter 12.18.010 of the ordinance. The City has enforcement mechanisms through Notice of
Violations, administrative fines of $187/day and up to $1000/day, emergency cease and desist orders, suspension
of MS4 access, and abatement reimbursement.
Of the city’s 89 outfalls, all major outfalls (15) and a third of the minor outfalls are inspected annually. To date,
no illicit discharges have been detected or reported. Inspections are documented within ArcGIS Survey 123,
which maps the locations of each outfall, along with specific inspection data and photos pertaining to each outfall.
This information allows city staff and crews to determine what maintenance is needed or has previously been
completed for each outfall.
The Engineering Department’s number is located on the city’s webpage for the public to report a spill. If a spill
occurs after hours, the public is directed to call the DNR Spill Hotline or the Fire Department, both numbers are
listed on the website (https://www.rfcity.org/245/Engineering). When complaints are received, they are
immediately investigated by engineering staff and an IDDE report form is filled out and kept on file. The City
maintains an internal procedure sheet detailing IDDE procedures, appropriate contacts that lead in follow-up
procedures, spill cleanup company or contractor. In addition, the City is looking into IDDE sampling kit options
to have readily available in staff vehicles and intend to purchase the kits within the next 30 days.
Outreach efforts to educate the public about IDDE have been made through signage on display at the local
baseball stadium and the MS4 Annual Report is presented to the city council. Annual staff training is provided,
and procedures are outlined in Storm Water pollution Prevention Plans (SWPPPs) located at the Public Works
building.
CONSTRUCTION SITE EROSION CONTROL – MS4 GP SECTION 2.4
The city’s Construction Site Pollutant Control program is led by the City Engineer, Senior Engineer, and Planning
and Engineering Technician. The city’s construction site erosion control ordinance requirements were last
updated in 2016 with minor changes on post-construction and are found in Chapter 12.16.020.A. The city’s
threshold for requiring erosion control permit coverage applies to land development or land disturbing activity of
any commercial, industrial or multi-family residential site that would change the stormwater performance the site.
Once an application is received, the city’s construction site plan review and permitting procedure begins with the
Engineering Department. Plans are then shared, reviewed, and discussed with Public Works and Utility staff.
Each plan is required to meet the city’s requirements outlined in the construction site permit checklist for pre- and
post-development hydrology, potential impacts of proposed activity, quantity of stormwater discharges, potential
impact on water resources and drainage utilities, and effectiveness and acceptability of proposed stormwater
management measures. Erosion control aspects are reviewed by the Planning and Engineering Technician. The
permit includes a financial guarantee that is held until all stormwater facilities are properly installed and certified
by an engineer. A long-term maintenance agreement is also required prior to release of the financial guarantee.
The city has 15 days to review applications. If deficiencies are found during the review process, the city notifies
the applicant via email with comments. Once application requirements are met, the permit is issued by the city’s
Senior Engineer. Application fees depend on the size of the project and cost $1000 + $100/additional acre.
Page 6
Once a project is permitted, the permittee is required to install and implement Best Management practices
(BMP’s) prior to land disturbing activity. The Planning and Engineering Technician oversees construction sites
and meets the inspection frequencies requirements outlined in the MS4 General Permit. All active sites are
mapped and assigned for inspections though Survey 123 and Fields Map app. Once an inspection is complete,
they are sent to the permittee or contractor and then saved to a folder online. When issues are found, an
inspection report is sent along with a re-inspection date. In most instances, a 24-hour timeline is given for repairs
to be made, depending on the weather. Inspections continue until 70% stabilization is achieved, at which time,
permits are terminated.
When a site is out of compliance, the city has the authority to issue warnings, NOVs, citations, and bill permittees
for costs incurred by the city to repair sites. The Planning and Engineering Technician has the authority to
implement enforcement, including the issuance of citations. Citations can be issued daily at a rate of $187/day
and up to $1000/day maximum.
POST-CONSTRUCTION STORM WATER MANAGEMENT – MS4 GP SECTION 2.5
The city’s post-construction storm water management program is overseen by the engineering department. The
city’s post-construction ordinance is Chapter 12.16 Stormwater Management of the local municipal code. The
ordinance largely mimics NR151 performance standards and exceeds some requirements including reduction of
TSS by 85% for new development (compared to the department’s requirement of 80%). The ordinance also
appears to have some inconsistencies with NR151 performance standards. For example, it does not appear that the
ordinance includes standards equivalent to the protective area performance standards of NR 151.125 or NR
151.245 as required by the permit.
It should be noted the City is currently working on amending its ordinance (Ch.17.24-Regulations for the
protection of wetlands within the shoreland) to apply to all wetlands in the City. The tentative schedule is to
consider the proposed amendment at planning commission in March, and City Council in March and April of
2026.
POLLUTION PREVENTION– MS4 GP SECTION 2.6
The city’s Pollution Prevention Program is overseen by the Public Works Manager. The municipal public works
facility, yard waste site, and privately owned facilities are inspected the second Wednesday of each month by the
Public Works Supervisor. Inspections forms are filled out, scanned, and saved online in the city’s Stormwater
Pond GIS layer.
A Stormwater Pollution Prevention Plan for the Municipal Yard and Yard Waste Facility was updated in
November 2025 to include snow disposal locations, disposal of material from the facilities pond, street sweeping
disposal, and city pit. The city’s Public Works department is responsible for BMP inspection and maintenance,
street sweeping, public works yard operations, and winter road maintenance.
Leaf Collection
Leaves are swept five days a week starting in mid-September (or when leaves begin to fall) until the weather turns
cold (approximately 60 days). Each Public Works employee with a designated snowplow route also sweeps their
route and leaves are brought to the yard waste site. The city does not offer yard leaf collection pick-up for
residents, but residents are encouraged to drop-off leaves at the yard waste site.
Street Sweeping
A Tymco 500 a regenerative air street sweeper is used throughout the city in the Spring (weather dependent) and
sweeping also coincides with Fall leaf collection. Sweepings are taken to the Public Works facility yard and are
Page 7
hauled to Waste Management Hazarded Waste facility in Eagan, MN. There is a designated area at the Public
Works facility where sweepers are washed out. Two inlets are located in the street sweeping washout area. The
larger of the two is cleaned out up to six times per year or on an as needed basis and material removed is taken to
by Waste Management to their landfill in Burnsville, MN. Overflow from the sump drain leads to a smaller inlet,
which drains into the facilities pond in the northwest corner of the property. Sweepings are tracked and tonnage
is updated on the city’s website.
Catch Basin Cleaning
A majority of the catch basins are cleaned annually during the street seeping process to prevent any maintenance
issues. If a catch basin is clogged, the city uses a vac unit to clean it out and materials are stored at the Public
Works facility along with the street sweeping materials.
Yard Waste Site
The city’s yard waste site is located at 901 West Locust Street and is open April through November (weather
dependent) on Tuesdays, Thursdays, Saturdays, and Sundays with set hours. During this time, the public can
drop-off leaves, grass clippings, tree debris, and Christmas tree collection in January. Electronic recycling items,
such as old phones, printers, computers, TV screens, and monitors are also accepted and placed in a watertight
metal shipping container. A gate with a large overhang was recently installed to prevent illegal dumping and
large industrial vehicles from entering the site.
In December of each year, a custom grinding company is contracted to grind the materials on site. A majority of
the material is hauled to a burn plant, and a small amount of mulch is kept on site. A second grinding occurs in
January after Christmas tree collection.
Winter Road Maintenance
The city maintains approximately 161 lane-miles primarily using salt. The city also pre-treats with brine, and
beet-heat as a pre-wetter. No sand is used. The city has found that prewetting the salt provides less scatter loss.
Treated salt is used on sidewalks. However, they are phasing out the use of treated salt. Once phased out, they
plan on buying a small, bagged amount for sidewalks rather than keeping a larger supply at the Public Works
facility.
Five plow trucks are used, along with a one-ton truck equipped with a salt brine tank for pretreating. Plow trucks
are calibrated at the beginning of the winter season and recalibrated as needed and there is a maximum salt limit
per lane mile that trucks can use. Snow is disposed of in two field locations adjacent to the Waste Water
Treatment Plant (WWTP) and debris is removed once the snow has melted in the spring by St. Croix County
Trustees. Snow disposal locations are listed on the storm sewer system map.
Turf Management
The city manages 18 city parks greater than 5 acres in size. There is no ordinance regarding fertilizer
management. However, the city does not typically use granular fertilizer but does use a broad leaf herbicide.
Nutrients are applied in the spring (weather dependent) but this does not occur every year. Chemicals are stored
in a locked storage building in Larson Park and a small supply of weed killer (two, one-gallon jugs) is stored at
the Public Works facility. Currently, the City does not conduct soil testing. It was noted if the City should need
to establish turf area of five acres or greater at a park property in the future, soil testing will be conducted.
Internal Staff & Education
The city has a robust training program let by the Public Works Manager, Engineering Technician, and Safety
Coordinator. Education is prioritized through frequent trainings such as: annual training of Public Works
employees, training of new employees, IDDE prevention, reporting, and cleanup training, Wisconsin Saltwise
trainings (with plans of hosting a Saltwise training in 2026), fertilizer/weed training, confined space, forklift,
trenching/excavating/ CPR, basic first-aid, chemical usage, spills, trenching & excavating, chainsaw safety, and
Page 8
urban forestry. Effectiveness is based on how staff implements things upon receiving training. The city maintains
an internal training log that employees fill out at every training.
Stormwater Quality Modeling MS4 GP Section 2.7
The department received the city’s pollutant load analysis and the modeled storm water management in 2007. The
city’s modeling to meet the 20% TSS reduction requirement included street sweeping twice annually and twice
weekly for the downtown area. The city states that they still perform this sweeping and track the weight of
material collected.
The 40% TSS requirement that is detailed in s. NR 151.25(2)(4), is no longer enforceable due to the provisions of
state budget bill 2011 Wisconsin Act 32. It should be noted, however, that if storm water treatment best
management practices were in place as of July 1, 2011, and provide treatment beyond the 20% TSS reduction
requirement, those practices must continue to be maintained.
Page 9
TABLE 1. OBSERVATIONS & REQUIRED ACTIONS SUMMARY
Program & Permit
Reference
Observations (A – Required Action*, B – Recommended Action)
*necessary to maintain compliance with referenced permit condition
2.5 Post-Construction Storm
Water Management
A.2 The ordinance or other regulatory mechanism shall establish or include
new development and infill, and post-construction performance standards
equivalent to those in ss. NR 151.122 through 151.126 and 151.242 through
151.246, Wis. Adm. Code per Section (2.5.1 (c)).
Other Documentation: Program documents associated with the City of River Falls MS4 (Program
procedures, ordinances, modeling, and annual reports provided by the City) are located in the Eau Claire
DNR Service Center, 1300 W Clairemont Avenue, Eau Claire, WI.
ORDINANCE NO. 2026-13
AN ORDINANCE AMENDING
TITLE 17 ZONING, CHAPTER 17.124
(REGULATIONS FOR THE PROTECTION OF WETLANDS WITHIN THE
SHORELAND)
THE COMMON COUNCIL OF THE CITY OF RIVER FALLS DOES ORDAIN:
Section 1. That Chapter 17.124 - Title be amended as follows:
Chapter 17.124 – REGULATIONS FOR THE PROTECTION OF WETLANDS WITHIN THE
SHORELAND Chapter Title to be amended as follows:
Chapter 17.124 – REGULATIONS FOR THE PROTECTION OF WETLANDS AND
SHORELAND
Section 2. That Chapter 17.124.010.C.1.a. – Introductory provisions, General
Provisions, Applicability be amended to cover all City wetlands and not just those near
the river as follows:
C. General Provisions.
1. Applicability.
a. The use of wetlands and the alteration of wetlands within the City’s corporate
limits shall be in full compliance with the terms of this Chapter and other applicable
local, state, or federal regulations, including without limitation § 281.36, Wis. Stats.,
and Chapters NR 103 and NR 151, Wis. Adm. Code, and as may be amended
from time to time.
Section 3. That Chapter 17.124.020 Definitions be amended to add the
definition of Protective Area as follows:
“Protective Area” means an area of land that commences at the top of the channel
of lakes, streams and rivers, or at the delineated boundary of wetlands, and that is the
greatest of the following widths, as measured horizontally from the top of the channel or
delineated wetland boundary to the closest impervious surface. However, in this section,
“protective area” does not include any area of land adjacent to any stream enclosed within
a pipe or culvert, so that runoff cannot enter the enclosure at this location.
(a) For outstanding resource waters and exceptional resource waters, 75 feet.
(b) For perennial and intermittent streams identified on a U.S. geological survey 7.5-
minute series topographic map, or a county soil survey map, whichever is more
current, 50 feet.
(c) For lakes, 50 feet.
(d) For wetlands not subject to par. (e) or (f), 50 feet.
(e) For highly susceptible wetlands, 75 feet. Highly susceptible wetlands include the
following types: calcareous fens, sedge meadows, open and coniferous bogs, low
prairies, coniferous swamps, lowland hardwood swamps, and ephemeral ponds.
(f) For less susceptible wetlands, 10 percent of the average wetland width, but no
less than 10 feet nor more than 30 feet. Less susceptible wetlands include: degraded
wetlands dominated by invasive species such as reed canary grass; cultivated hydric
soils; and any gravel pits, or dredged material or fill material disposal sites that take
on the attributes of a wetland.
(g) In pars. (d) to (f), determinations of the extent of the protective area adjacent to
wetlands shall be made on the basis of the sensitivity and runoff susceptibility of the
wetland in accordance with the standards and criteria in s. NR 103.03.
(h) Wetland boundary delineation shall be made in accordance with s. NR 103.08
(1m). This paragraph does not apply to wetlands that have been completely filled in
compliance with all applicable state and federal regulations. The protective area for
wetlands that have been partially filled in compliance with all applicable state and
federal regulations shall be measured from the wetland boundary delineation after
fill has been placed. Where there is a legally authorized wetland fill, the protective
area standard need not be met in that location.
(i) For concentrated flow channels with drainage areas greater than 130 acres, 10
feet.
(j) Notwithstanding pars. (a) to (i), the greatest protective area width shall apply
where rivers, streams, lakes, and wetlands are contiguous. A stream or lake is not
eligible for a lower protective area width even if contiguous to a less susceptible
wetland.
Section 4. That Chapter 17.124.030 Shoreland-wetland zoning district be
amended to include all City wetlands as follows:
B. District Boundaries.
1. The shoreland-wetland zoning district includes all wetlands that are shown on the
most recent version of the Wisconsin wetland inventory, have a valid DNR-approved
delineation, or are:
Section 5. That Chapter 17.124.030 Shoreland-wetland zoning district be
amended to add requirements for Protective Areas as follows:
E.
3. Requirements for Protective Areas.
a. No impervious surface including transportation facilities as defined in Wis. Admin. Code
§ NR 151.002 (48) may be constructed within a protective area unless the transportation
facility authority determines, in consultation with the department of natural resources, that
there is no practical alternative. If there is no practical alternative to locating an impervious
surface or transportation facility within a protective area, the impervious surface or
transportation facility may be constructed in the protective area only to the extent the
transportation facility authority, in consultation with the department of natural resources,
determines is reasonably necessary. The transportation facility authority shall state in the
design plan prepared pursuant to s. NR 151.241 (3), why it is necessary to construct the
impervious surface or transportation facility within a protective area.
b. Where land disturbing construction activity occurs within a protective area, adequate
sod or self-sustaining vegetative cover of 70 percent or greater shall be established and
maintained where no impervious surface is present. The adequate sod or self -sustaining
vegetative cover shall be sufficient to provide for bank stability, maintenance of fish
habitat, and filtering of pollutants from upslope overland flow areas under sheet flow
conditions. Non-vegetative materials, such as rock riprap, may be employed on the bank
as necessary to prevent erosion such as on steep slopes or where high velocity flows
occur.
Note: It is recommended that seeding of non- invasive vegetative cover be used in the
protective areas. Some invasive plants are listed in Ch. NR 40. Vegetation that is flood
and drought tolerant and can provide long-term bank stability because of an extensive root
system is preferable. Vegetative cover may be measured using the line transect method
described in the University of Wisconsin ext ension publication number A3533, titled
“Estimating Residue Using the Line Transect Method”.
c. Best management practices such as filter strips, swales, or wet detention ponds, that
are designed to control pollutants from non-point sources, may be located in the protective
area.
Note: Other laws, such as Ch. 30, Wis. Stats., and Chs. NR 103, 115, 116, and 117, Wis.
Admin. Code, and as may be amended from time to time, and their associated review and
approval processes may apply in the protective area.
d. Exemptions. This section does not apply to any of the following:
i. Structures that cross or access surface waters such as boat landings,
bridges, and culverts.
ii. Transportation facilities from which the runoff does not enter the surface
water, including wetlands, without first being treated by a BMP to meet the
requirements of ss. NR 151.242 to 151.243, except to the extent that
vegetative ground cover is necessary to maintain bank stability.
Note: A vegetated protective area to filter runoff pollutants from transportation
facilities described in par. ( iii) is not necessary since the runoff at that location is
treated prior to entering the surface water. Other practices necessary to meet the
requirements of this section, such as a swale or pond, will need to be designed
and implemented to reduce runoff pollutants prior to runoff entering a surface water
of the state. The requirements of Ch. NR 103 still apply and should be considered
before runoff is diverted to or from a wetland.
Section 6. Effective date. This ordinance amendment shall take effect from and after
its date of publication as provided by law.
FOR THE CITY OF RIVER FALLS
Alison Page, Mayor
ATTEST:
Amy White, City Clerk
Adopted: ____________
Published: ____________
3
MEMORANDUM
TO: Mayor Page and City Council
FROM: Gordon Young, Chief of Police
DATE: July 14, 2026
TITLE: ORDINANCE CREATING CHAPTER 10.21 REGULATING ELECTRIC
BICYCLES AND ELECTRIC SCOOTERS – Second Reading
RECOMMENDED ACTION
Second reading and disposition to adopt Ordinance 2026-14 creating Chapter 10.21 of the
Municipal Code to regulate the use of electric bicycles and electric scooters within the City of
River Falls.
BACKGROUND
The City of River Falls has received calls and complaints regarding the operation of electric
bicycles (e -bikes) and electric scooters in areas shared with pedestrians and motor vehicles,
including city streets, sidewalks, and multi-use/shared bike paths.
Electric bicycles and electric scooters differ from traditional bicycles in speed, weight, and method
of propulsion. These devices are capable of operating at higher speeds and are often used in
locations not designed for their operation.
At present, the Municipal Code does not contain comprehensive, locally adopted regulations
specific to electric bicycles and electric scooters. The proposed ordinance is intended to establish
a clear local framework governing their use in order to protect public safety for operators,
pedestrians, and the motoring public.
DISCUSSION
Current Situation
The Police Department has received complaints regarding young children operating powered
electric bicycles and scooters in public spaces. In many cases, these devices are not equipped
or designed to safely operate in lanes of traffic, nor are the operators adequately prepared to
navigate roadway conditions.
Operation of these devices under such circumstances presents a life- safety concern for the
operators as well as for pedestrians, bicyclists, and the motoring public.
Proposed Ordinance
The proposed ordinance creates Chapter 10.21 of the Municipal Code to regulate electric bicycles
and electric scooters. Key provisions include:
Memorandum to Mayor and City Council
July 14, 2026
Page 2
• Defining electric bicycles by class and distinguishing them from electric scooters;
• Establishing minimum age and licensing requirements for operators;
• Limiting where electric bicycles and electric scooters may be operated, including
restrictions on sidewalks;
• Requiring compliance with applicable state traffic laws and local ordinances;
• Establishing equipment and lighting requirements; and
• Assigning responsibility to parents or guardians who knowingly permit violations by
minors.
These provisions are intended to provide clarity for residents, operators, and enforcement while
addressing safety concerns associated with the increased use of powered electric devices.
CONCLUSION
It is recommended that the Council adopt Ordinance 2026-14 creating Chapter 10.21 of the
Municipal Code to regulate electric bicycles and electric scooters. This ordinance establishes
reasonable and clearly defined rules to address safety concerns, protect young users, and reduce
risks to pedestrians and the motoring public.
ORDINANCE NO. 2026-14
AN ORDINANCE CREATING CHAPTER 10.21 OF THE MUNICIPAL CODE RELATING TO
ELECTRIC BICYCLES AND ELECTRIC SCOOTERS
THE COMMON COUNCIL OF THE CITY OF RIVER FALLS DOES ORDAIN:
Section 1. That Chapter 10.21 titled “Regulating Electric Bicycles and Electric
Scooters,” of the City of River Falls Municipal Code is hereby created to read as follows:
“10.21 Regulating Electric Bicycles and Electric Scooters.
Sections
10.21.010 Definitions.
As used in this chapter, the following terms shall have the meaning indicated:
Bike Paths are defined as any impervious surface completely separated from the roadway
that are eight feet wide or greater and constructed for pedestrian, bicycle, or other non-
automotive means of transportation. Bike Paths may also be referred to as Multi-Use Paths
or Shared Use Paths.
Electric Bicycle means a bicycle that is equipped with fully operative pedals for propulsion
by human power and an electric motor of 750 watts or less and that meets the requirements
of any of the following classifications:
A. Class 1 Electric Bicycle means an electric bicycle equipped with a motor that
provides assistance only when the rider is pedaling and that ceases to provide
assistance when the bicycle reaches the speed of 20 miles per hour.
B. Class 2 Electric Bicycle means an electric bicycle that may be powered solely by
the motor and is not capable of providing assistance when the bicycle reaches the
speed of 20 miles per hour.
C. Class 3 Electric Bicycle means an electric bicycle equipped with a motor that
provides assistance only when the rider is pedaling and that ceases to provide
assistance when the bicycle reaches the speed of 28 miles per hour.
Electric scooter means a device weighing less than 100 pounds that has handlebars and
an electric motor, powered by an electric motor and optionally human power , and has a
maximum speed of not more than 20 miles per hour on a paved level surface when powered
solely by the electric motor. “Electric scooter” does not include an electric personal assistive
mobility device, motorcycle, motor bicycle, electric bicycle, or moped.
Sidewalks are defined as any impervious portion of a roadway between the curb line or
lateral lines of a roadway and adjacent property lines constructed for pedestrian use and
are less than eight feet in width.
10.21.020 Permitted users of electric bicycles and electric scooters.
Operators of a Class 3 electric bicycle on City roadways, sidewalks, or bike paths must be
16 years of age or older.
No person less than 12 years of age shall operate an electric scooter on City roadways ,
sidewalks, or bike paths except that persons 8 through 11 years of age may do so during
daylight hours if accompanied by an adult capable of remaining close enough to ensure the
safe operation of the scooter by such child, such as by walking or running alongside, using
their own electric scooter or bicycle, or engaging in a similar activity. This provision is
intended to permit the usage of electric scooters by families.
10.21.030 Rules of the Road.
Subject to the provisions of this Chapter 10.21, the provisions of Chs. 346 and 347, Wis.
Stats., and applicable City ordinances , shall govern the operation of electric bicycles and
electric scooters, where appropriate.
10.21.040 Use of electric bicycles and electric scooters; Where prohibited.
Only Class 1 E lectric Bicycles may be used on sidewalks that allow bicycle use on the
same terms and conditions (e.g., age restrictions), provided they are being operated
without motor assistance and using only human power.
Class 2 Electric Bicycles and Class 3 Electric Bicycles are prohibited from use on all
sidewalks in the City.
Electric scooters may be used on sidewalks or bike paths that allow bicycle use on the
same terms and conditions (e.g., age restrictions). Electric scooters are prohibited from use
on any roadway having a speed limit of more than 25 miles per hour.
A map showing certain sidewalks and bike paths as of the date of adoption of this Chapter
10.21 is attached hereto as Exhibit A.
10.21.050 Equipment Regulations.
Every person using electric scooters between one-half hour after sunset and one-half hour
before sunrise shall have the scooter equipped with a lamp firmly attached to the front of
such electric scooter exhibiting a white light to the front, and with a ref lector or a lamp
mounted on the rear of the vehicle visible at a distance of 500 feet. The reflector shall not
be less than one and a half to two inches for rectangular models or three inches in diameter
for round models.
10.21.060 Riding electric bicycles and electric scooters on roadway.
Every person operating an electric bicycle or electric scooter upon a roadway shall ride as
near to the right side of the roadway as practicable, exercising due care when passing a
standing vehicle or one proceeding in the same direction. Persons riding electric bicycles
or electric scooters upon a roadway shall ride single file.
10.21.070 Responsibility of parent or guardian for violation.
No parent or guardian of any child shall authorize or knowingly permit such child to violate
any of the provisions of this chapter 10.21.
10.21.080 Penalty.
Any person violating the provisions of this chapter 10.21 shall be subject to the provisions of
chapter 1.20 of this municipal code.”
Section 2. Severability. The provisions of this ordinance shall be deemed severable and
it is expressly declared that the City of River Falls would have passed the other provisions of this
ordinance irrespective of whether or not one or more provisions may be declared invalid. If any
provision of this ordinance or the application to any person or circumstances is held invalid, the
remainder of the ordinance and the application of such provisions to other person’s circumstances
shall not be deemed affected.
Section 3. Effective date. This Ordinance shall take effect from and after its date of
publication as provided by law.
FOR THE CITY OF RIVER FALLS
Alison H. Page, Mayor
ATTEST:
Amy White, City Clerk
Adopted: ____________
Published: ____________
EXHIBIT A
MEMORANDUM
TO: Mayor Page and City Council
FROM: Amy White, Community Services Director/City Clerk
DATE: July 14, 2026
TITLE: RESOLUTION CREATING WARD 19 AND CORRECTING THE WARD
DESIGNATION FOR THE TERRITORY ANNEXED BY ORDINANCE NO. 2026-
12
RECOMMENDED ACTION
Adoption of the attached Resolution creating Ward 19, assigning the territory annexed by
Ordinance No. 2026-12 to Ward 19, designating the polling place for the ward, and correcting
the clerical error contained in Section 4 of the annexation ordinance.
BACKGROUND
On October 20, 2025, the City of River Falls received a Petition for Annexation by Unanimous
Consent pursuant to Wis. Stat. § 66.0217(2). The petition was submitted by the owners of one
hundred percent (100%) of the property—the Delbert F. Johnson Revocable Trust and the Elaine
H. Johnson Revocable Trust, through Trustee Randall Johnson—requesting annexation of
approximately 55.444 acres from the Town of Clifton to the City of River Falls.
The annexed property consists of Parcel Identification Numbers (PINs) 002-01001-0200 and 002-
01001-0600. The petition certified that the territory has a population of zero, making the
annexation eligible for annexation by unanimous approval under Wis. Stat. § 66.0217(2).
The Common Council approved the annexation by adopting Ordinance No. 2026- 12 on June 9,
2026. The ordinance assigned the property a Future Land Use designation of Medium Density
Residential and Mixed Use and temporary zoning classifications of R-2 Multiple Family (Medium
Density) Residence District and B -3 Highway Commercial District upon the recommendation of
the Plan Commission pursuant to Wis. Stat. § 66.0217(8)(a).
DISCUSSION
Following adoption and recording of Ordinance No. 2026- 12, staff identified a clerical error in
Section 4 of the ordinance. The ordinance states that the annexed territory shall become part of
Ward 2. Upon review of the City's adopted ward map and election boundaries, staff determined
that the territory should instead be assigned to a newly established Ward 19.
Because Ward 19 does not currently exist, the Common Council must formally establish the ward
before the annexed territory can be assigned to it. Wisconsin law authorizes municipalities to
establish and adjust municipal wards for election purposes under Wi s. Stat. § 5.15. Following
annexation, municipalities are also responsible for assigning annexed territory to appropriate
4
Memorandum to Mayor and City Council
July 14, 2026
Page 2
election wards and reporting those changes to the appropriate election officials and the Wisconsin
Elections Commission.
The proposed resolution creates Ward 19, consisting solely of the territory annexed by Ordinance
No. 2026-12, assigns the annexed property to that ward, and establishes the polling location for
the ward as:
River Falls City Hall
222 Lewis Street
River Falls, WI 54022
Designating a polling location is consistent with the City's authority under Wis. Stat. § 5.25, which
requires municipalities to establish polling places for each ward or combination of wards.
The resolution also expressly provides that the newly established ward designation supersedes
the inconsistent language contained in Section 4 of Ordinance No. 2026- 12. All remaining
provisions of the annexation ordinance—including the annexation itself, l egal description, future
land use designation, zoning classifications, reimbursement provisions, and effective date—
remain unchanged.
Following Council approval, the City Clerk will update the City's official ward records, election
maps, and municipal boundary records and provide the required notifications to the Wisconsin
Elections Commission, Pierce County, and other governmental agencies as required by law.
CONCLUSION
Staff recommends that the Common Council adopt the attached Resolution Creating Ward 19,
Assigning the Territory Annexed by Ordinance No. 2026- 12 to Ward 19, and Designating the
Polling Place.
Adoption of the resolution will:
• Formally establish Ward 19 in accordance with Wis. Stat. § 5.15;
• Assign the annexed territory to the newly created ward;
• Correct the clerical error contained in Section 4 of Ordinance No. 2026-12;
• Designate River Falls City Hall, 222 Lewis Street, River Falls, Wisconsin 54022, as the
polling location for Ward 19; and
• Ensure the City's election records accurately reflect the City's municipal boundaries and
ward structure while leaving all other provisions of Ordinance No. 2026-12 unchanged.
RESOLUTION NO.
RESOLUTION CREATING WARD 19 AND CORRECTING THE WARD DESIGNATION FOR THE
TERRITORY ANNEXED BY ORDINANCE NO. 2026-12
WHEREAS, on October 20, 2025, the City of River Falls received a Petition for Annexation by Unanimous
Consent pursuant to Wis. Stat. § 66.0217(2), requesting annexation of approximately 55.444 acres from
the Town of Clifton into the City of River Falls; and
WHEREAS, on June 9, 2026, the Common Council adopted Ordinance No. 2026- 12 annexing the
territory into the City of River Falls and Section 4 of Ordinance No. 2026- 12 designated the annexed
territory as part of Ward 2; and
WHEREAS, the Common Council finds that creation of Ward 19 is necessary to properly administer
elections and accurately assign the annexed territory to a municipal ward; and
WHEREAS, following adoption of the ordinance, the City determined that the Ward 2 designation was
made in error and that the annexed territory should instead be assigned to a newly created Ward 19 in
accordance with the City's ward plan and election administration requirements.
NOW, THEREFORE, BE IT RESOLVED, by the Common Council of the City of River Falls, Wisconsin,
as follows:
1. Creation of Ward 19. Pursuant to Wis. Stat. § 5.15, the Common Council hereby establishes Ward
19, consisting solely of the territory annexed into the City by Ordinance No. 2026-12.
2. Ward Assignment. Effective upon adoption of this Resolution, the territory annexed by Ordinance
No. 2026-12 shall be assigned to Ward 19 for all election and municipal purposes.
3. Polling Place. The polling place for Ward 19 shall be River Falls City Hall, 222 Lewis Street, River
Falls, Wisconsin 54022, or such other polling place as may be designated by the Common Council
in accordance with Wisconsin law.
4. Superseding Prior Ward Designation. The ward designation established by this Resolution shall
supersede the inconsistent language contained in Section 4 of Ordinance No. 2026- 12, which
designated the annexed territory as Ward 2. All other provisions of Ordinance No. 2026-12 remain
unchanged and in full force and effect.
5. Clerk Duties. The City Clerk is directed to notify the Wisconsin Elections Commission, Pierce
County, St. Croix County, and any other agencies as required by law; to update the City's official
ward and election records; and to take all actions necessary to implement this Resolution.
Dated this 14th day of July 2026.
Alison H. Page, Mayor
ATTEST:
Amy White, City Clerk
MEMORANDUM
TO: Mayor Page and City Councilmembers
FROM: Jason Rohloff, Assistant to the City Administrator
DATE: July 14, 2026
TITLE: MERCHANT MCINTYRE & ASSOCIATES, LLC 2026-2027 AGREEMENT
RECOMMENDED ACTION
Approve the resolution authorizing the Merchant McIntyre & Associates, LLC 2026-2027 Agreement.
BACKGROUND
Since December 2022, Merchant McIntyre & Associates, LLC has had partnership agreements with
the City of River Falls. Their role has been to help the City identify and secure federal funding
opportunities that align with the City’s legislative priorities and strategic initiatives, while also advising
the City on changing federal legislation, appropriations activity, and grant program requirements.
Merchant McIntyre has helped the City shape funding strategy, match local projects to federal
opportunities, prepare grant and congressional funding requests, facilitate engagement with federal
lawmakers and agency officials, and provide annual insight into emerging opportunities and barriers.
DISCUSSION
As of December 31, 2025, The City’s investment in Merchant McIntyre has helped generate
$5,736,550 in federal investments, with efforts continuing into 2027 and beyond (see grid attached).
FINANCIAL
The proposed agreement with Merchant McIntyre runs from July 1, 2026 to June 30, 2027. Billing is
done in advance at a rate of $8,500 per month, for a total annual cost of $102,000 , which remains
the same as the prior 2025-2026 agreement.
CONCLUSION
Merchant McIntyre & Associates, LLC has been a valuable partner in assisting the City of River Falls
to pursue funding opportunities that support the City ’s strategic initiatives and legislative priorities.
Continuing this partnership is expected to further strengthen the City’s ability to secure external
funding and advance important projects efficiently and effectively.
Sources Amount Uses Amount
2026-2027 General Fund $102,000 MM 2026-2027 Contract $102,000
5
Federal Agency/Funder Grant Program / Funding
Opportunity Deadline/Timeline Internal SME Funding Details Description Completed Steps Next Steps
U.S. Army Corps of Engineers (USACE) Increase USACE Funding for
Kinni Corridor Project
FY27 Appropriations
consideration in
June/July 2026.
Amy Peterson Pursuing up to $15,000,000 in federal
support.
RF and MM will pursue additional federal support
for the Kinni Corridor project. RF and MM are
pursuing dedicated funding under USACE’s Sec.
206 (Aquatic Ecosystem Restoration) in order to
ensure the project is able to move forward.
The City's proposed WRDA language was
included in the enacted WRDA 2024 bill.
This language lifts the cap on federal
support through USACE's Sec. 206
program to $15,000,000. Waiver request
granted by USACE HQ. Sen. Baldwin and
Rep. Van Orden sent a letter advocating
for the project's inclusion in USACE's
FY26 Work Plan.
MM has resubmitted the City's Congressionally
Directed Spending request for $1.8 million for the Kinni
Project to Sen. Baldwin. Sen. Baldwin submitted the
project to the Senate Appropriations Committee. The
Senate Appropriations Committee is expected to
release their list of funded projects in June/July.
Department of Transportation Safe Streets and Roads for All Deadline: May 26, 2026 Todd Nickleski Est. up to $25 million for
implementation projects.
Based on the City’s successful application for an
SS4A Planning Grant in 2023, River Falls will be
eligible to apply for an SS4A Implementation Grant
of up to $25,000,000 in 2026. Prior to submitting
an implementation application, the City must
approve the SS4A Action Plan developed under the
previous SS4A grant. Implementation funding
provided in 2026 will be available to fund specific
safety projects identified in the City’s finalized
SS4A Action Plan.
Biweekly calls established with Catherine
(SME), Launch call completed. RF has
shared draft Action Plan, project
concepts, and high level budget
estimates. MM has shared budget
development documents and LOS
template. RF and MM collaborating on
updated scope and budget incorporating
Main Street and 2nd Street. RF collecting
LOS.
RF and MM are finalizing materials and targeting
submission on Friday (5/22).
Federal Emergency Management Agency Fire Prevention and Safety
(FP&S) Grant Program Deadline: June 22, 2026 Chief Wilson Award Ce iling: $1.5 million
This program provides funding for activities to:
reduce residential fire risk, including by increasing
access to smoke alarm installations and fire
prevention education and training; support the
adoption and awareness of building codes;
support fire-related investigations, and; improve
firefighter safety, health, and well-being.
MM shared background on FEMA grant
funding and initiated data updates for
the departments profile.
MM to revisit with Chief Wilson.
Federal Emergency Management Agency Assistance to Firefighters
Grants (AFG) Deadline: June 22, 2026 Chief Wilson TBD
The Assistance to Firefighters Grants (AFG)
program is designed to enhance the health and
safety of public and firefighting personnel and to
provide support for emergency responders
regarding fire, medical, and all hazard events.
Funds may be used for operations and safety
activities such as: training, equipment, personal
protective equipment (PPE), wellness and fitness
programs, modifications to facilities, additional;
vehicle acquisition and joint/regional
interoperability projects.
MM shared background on FEMA grant
funding and initiated data updates for
the departments profile.
MM to revisit with Chief Wilson.
River Falls, Wisconsin
Federal Grants and Earmarks Tracker
ACTIVE FUNDING OPPORTUNITIES
National Endowment for the Arts Grants for Arts Projects Deadline: July 9, 2026 TBD Est. up to $100,000 with 1-1 cost share
requirement.
This program provides funding for community art
projects, including projects to incorporate are into
community facilities, parks and historic sites.
TBD MM to set meeting with City project leads.
Economic Development Administration
Public Works and Economic
Adjustment Assistance
Program
Submitted: 12/17/24 Amy Peterson Request Amount: $2,195,204
River Falls and MM have engaged EDA to discuss a
grant application to expand the St. Croix Valley
Business Innovation Center (SCVBIC).
Submitted on December 17, 2024. MM
submitted follow up materials at EDA's
request on January 10, 2025.
MM shared requested RFEDC SF424 Form with RF on
11/19. RF to complete and return as soon as possible.
Wisconsin Department of Administration Grants for Local Projects Submitted 10/30/25 Chief Wilson/Josh
Solinger Requested $2,000,000
This program offers funding to non-state
organizations for Capital Infrastructure projects
that benefit the broader public. DOA seeks to
collaborate with local organizations to create a
positive impact on communities across Wisconsin.
Submitted on October 30th, 2025 MM and RF to await updates from state.
Department of Transportation
Better Utilizing Investments to
Leverage Development
(BUILD) Grant Program
Submitted 2/26/26 Todd Nickleski Requested $24,145,040.00
The City of River Falls previously applied for RAISE
planning funding for the Connect River Falls
Initiative (CRFI). Based on direction provided by
the City, River Falls will pursue an implementation
application in 2026 focused on Main Street
redevelopment.
Submitted on February 24th, 2026 Award annoucements anticipated from DOT in June
2026.
FY27 Congressionally Directed Spending
Congressionally Directed
Spending/Community Project
Funding
Submitted 03/26/2026 Amy Peterson Requested $1,850,000
MM and RF resubmitted request for USACE
funding to move the Kinni Project from the
Feasibility phase to Design and Implementation
Application submitted to Senator Bladwin
3/26/2026 MM and RF to await updates.
FY27 Congressionally Directed Spending
Congressionally Directed
Spending/Community Project
Funding
Submitted 03/09/2026 Chief Wilson Requested Amount: $750,000
MM and RF will develop an application to Rep. Van
Orden and Sen. Baldwin for a new fire engine for
RFFD.
Application Submitted to Congressman
Van Orden on March 9th. MM and RF to await updates.
Department of Agriculture Rural Business Development
Grant (RBDG) Program Awarded in June 2023. Keri Schreiner $38,200
Awarded funding will be utilized to expand
business recruitment activities at the St. Croix
Valley Business Innovation Center. This funding
has a performance period of one-year and the City
may apply for funding in subsequent cycles to
continue project activities.
Performance period underway. RF and MM will reconvene based on FY24 application
outcome.
SUBMITTED GRANTS
AWARDED GRANTS
Department of Transportation Safe Streets and Roads for All Awarded in December
2023. Todd Nickleski $200,000
MM submitted an application for an SS4A Planning
and Demonstration Grant. Funding will cover costs
associated with retaining a consultant to develop a
SS4A Action Plan for River Falls, building off
existing roadway safety activities included in the
City’s Comprehensive Plan. Receiving a Planning
and Demonstration Grant will enable the City to
pursue an Implementation Grant in subsequent
cycles of the SS4A program.
Notice of Award received on 12/13. RF will update MM on discussions with FHWA
regarding grant agreement.
WI Division of Energy, Housing and
Community Resources Flexible Facilities Program Awarded in October
2024. Tanya Misselt $4,080,488
The State of Wisconsin Department of
Administration has been awarded $107 million for
the Flexible Facilities Program to provide grants to
units of general local government (UGLGs) and
tribal governments for the purpose of carrying out
critical capital projects directly enabling work,
education, and health monitoring in response to
the Coronavirus (COVID-19) pandemic public
health emergen cy. Funding is available for the
construction of new or renovation or expansion of
existing libraries, community centers, and multi-
purpose community facilities that will offer
reliable, affordable high speed internet and other
digital connectivity technology that will directly
enable work, education, and health monitoring,
including remote options. The program
encourages focusing on economically distressed
areas, supporting community empowerment, and
adopting strong labor practices.
Submitted in July 2024. MM will provide additional support as needed.
WI Division of Enterprise Technology State and Local Cybersecurity
Grant Program
Awarded in November
2024. Mike Reardon $16,862
The City of River Falls, Wisconsin, seeks funding to
perform and implement necessary cybersecurity
upgrades to official City servers and technology.
River Falls will respond to cybersecurity audits and
vulnerability scans to ensure lasting safety,
efficiency, and sustainability of the City's
cybersecurity
posture. Specifically, funding will be used to
purchase MFA and MDR contracts.
Submitted in August 2024. MM will provide additional support as needed.
Fiscal Year
Title
Description
Agency
Amount
Member/Senator Rep. Van Orden Sen. Baldwin Sen. Baldwin Rep. Van Orden Rep. Van Orden Sen. Baldwin
Submitted to Committee? YES YES YES NO NO NO
Included in Committee bill? YES Not Included NO
Enacted? YES
Agency Pre-Award Checklist
Completed?
Notice of Award Issued?
Semi-Annual Progress Report #1
Completed?
Semi-Annual Progress Report #2
Completed?
Semi-Annual Progress Report #3
Completed?
AGENCY PRE-AWARD PROCESS: N/A
TBD, Anticipated in June 2026.
AGENCY PERFORMANCE PERIOD: N/A
PROGRESS
Sen. Baldwin
YES
TBD
COMPLETED
AGENCY PRE-AWARD PROCESS: N/A
AGENCY PERFORMANCE PERIOD: N/A
River Falls Fire Department
Engine Replacement Project
To cover the procurement of a new
fire engines and replace outdated
equipment.
USDA
$750,000
Fiscal Year 2027
CAP 206 Kinnickinnic River Corridor
Aquatic Ecosystem Restoration
Funding will be utilized to support the
City’s continued partnership with the
U.S. Army Corps of Engineers under
USACE's CAP 206 Program. Specifically,
funding will be utilized to implement
design and engineering activities
associated with the planned removal of
the Powell and Junction Falls Dams on
the Kinni River.
USACE
$1,850,000
Application forms submitted with USDA,
environmental review underway.
Status of Letter of Conditions?
AGENCY PERFORMANCE PERIOD: N/A AGENCY PERFORMANCE PERIOD: N/A
AGENCY PRE-AWARD PROCESS: IN PROGRESS AGENCY PRE-AWARD PROCESS: IN PROGRESS
Sen. Baldwin
NO
YES
YES
Rep. Van Orden
To cover the construction of an addition to the
station’s apparatus bay, which will significantly
improve the Department’s operational capacity.
This project will address the severe limitations
RFFD’s current station places on the
Department’s ability to meet the needs of their
rapidly growing community.
Funding will be utilized to support the City’s
continued partnership with the U.S. Army Corps
of Engineers under USACE's CAP 206 Program.
Specifically, funding will be utilized to
implement design and engineering activities
associated with the planned removal of the
Powell and Junction Falls Dams on the Kinni
River.
For the deployment of a new, 3-site fixed radio
system to more reliably cover emergency
communication in River Falls. Additionally,
investment through the CPF process would
enable the procurement of upgraded portable
radio equipment for the River Falls Police and
Fire Departments, enhancing interoperability
both locally and with other first responder
partners in the region.
Fiscal Year 2026
YES
CONGRESSIONAL CONSIDERATION: COMPLETED COMPL ETED CONGRESSIONAL CONSIDERATION: COMPLETED
$1,401,000 $1,850,000 $431,183
CONGRESSIONAL CONSIDERATION: COMPLETED
River Falls, Wisconsin
Federal Grants and Earmarks Tracker
AGENCY PRE-AWARD PROCESS: N/A
AGENCY PERFORMANCE PERIOD: N/A
Small Business Incubation and Innovation
Project
Funding will be utilized for the renovation of
existing coworking spaces, updated technology,
and the expansion of monthly seminars for local
small business owners and entrepreneurs.
SBA
$350,000
USDA USACE DOJ
Fiscal Year 2024
River Falls Fire Department Station
Renovation Project
CAP 206 Kinnickinnic River Corridor
Aquatic Ecosystem Restoration
Enhanced Communication and Public
Safety Assurance Project
Merchant McIntyre & Associates, LLC | 1634 Eye Street, NW, Suite 200 | Washington, DC 20006
SERVICE AGREEMENT
THE CITY OF RIVER FALLS, WI (the “City”) agrees to retain MERCHANT MCINTYRE &
ASSOCIATES, LLC, a Delaware limited liability company with a principal place of business in
Washington, D.C. (“MM”) (together, the “Parties”), for government relations services
commencing on July 1, 2026 and terminating on June 30, 2027 (the “Term”).
Fee. During the Term of this Agreement, the City agrees to pay MM a total professional fee of
$8,500 per month, billed monthly in advance. Payment shall be made to MM upon receipt at the
address listed on the MM invoice(s). Federal funds may not be used to pay MM professional fees.
Deliverables. MM agrees to provide the following deliverables during the Term of this
Agreement:
1. Implement the funding strategies identified in the Federal Funding Strategy and Federal
Grants Grid, as approved by the City.
2. Provide support to the City in all facets of the federal grant process, including applications.
3. Continue identifying federal grant opportunities for which the City is eligible and
competitive.
4. Continue engaging federal agency personnel with jurisdiction over funding as an advocate
of the City and building support for the City’s funding priorities and grant applications,
including Congressionally Directed Spending, among its Members of Congress.
Assurances. In its capacity as a consultant, MM shall make its best effort to assist the City in
pursuing its federal funding and government relations objectives. The nature of these objectives
shall be determined by the City with the advice and assistance of MM. In this role, MM shall plan
and implement all government relations strategies designed to accomplish the City’s federal
funding objectives; assist in the preparation of grant applications and supporting materials for the
initiatives; develop meetings with Members of Congress, congressional staff, and federal agency
decision-makers to advance the funding initiatives; and serve as liaison to federal agencies relevant
to the City’s funding initiatives. the City agrees to frequent communication with MM and to
provide MM the necessary information in real time to help MM plan and implement strategies.
Indemnification. The City agrees to indemnify and hold MM harmless from and against all
liability, including all actions, claims, damages, costs, and attorneys’ fees, which MM may incur
(or to which MM may be a party), arising out of actions taken or statements made by MM at the
City’s direction or based upon information provided by the City, except in the event of wrongful
acts or omissions on MM’s part.
Assignment. No other party shall assign any of its rights or delegate any of its duties or obligations
under this Agreement without the express written consent of the other party.
Merchant McIntyre Service Agreement – Page 2 of 2
* * *
IN WITNESS THEREOF, the parties hereto have executed or approved this Agreement on the
dates below their signatures.
_____________________________ ___________________________________
Brent Walton Merchant Scot Simpson
Principal and Co-Founder City Administrator
Merchant McIntyre & Associates, LLC City of River Falls, WI
Date: ____________________________ Date: _______________________________
# # # #
RESOLUTION NO.
RESOLUTION APPROVING MERCHANT MCINTYRE & ASSOCIATES, LLC
2026-2027 AGREEMENT
WHEREAS, Merchant McIntyre & Associates, LLC has assisted the City of River Falls since
December 2022 by helping identify and pursue federal funding opportunities that align with the
City’s legislative priorities and strategic initiatives; and
WHEREAS, as of December 31, 2025, the City’s investment in Merchant McIntyre & Associates,
LLC has helped generate $5,736,550 in federal investments for the City; and
WHEREAS, Merchant McIntyre & Associates, LLC continues to support the City’s efforts to
advance major capital projects, economic development initiatives, public safety priorities, and
other funding opportunities through federal advocacy, grant strategy, and coordination with
federal lawmakers and agencies; and
WHEREAS, the proposed 2026-2027 agreement runs from July 1, 2026 through June 30, 2027,
at a rate of $8,500 per month for a total annual cost of $102,000, which remains the same as the
prior agreement.
NOW, THEREFORE, BE IT RESOLVED that the Common Council hereby approves the
agreement between the City of River Falls and Merchant McIntyre & Associates, LLC and
authorizes the City Administrator to finalize necessary details and terms on behalf of the City,
including without limitation authorizing approval and signing of any grants and awards that are
awarded as a result of this partnership.
Dated this 14th day of July 2026.
Alison H. Page, Mayor
ATTEST:
Amy White, City Clerk
6
MEMORANDUM
TO: Mayor Page and City Council
FROM: Chris Feyereisen, IT Manager
Justin Wilson, Fire Chief
DATE: July 14, 2026
TITLE: RESOLUTION APPROVING THE PURCHASE OF 29 NEW COMPUTER
WORKSTATIONS FROM CDW-G
_____________________________________________________________________
RECOMMENDED ACTION
Approve a resolution to award and authorize the purchase of (29) new workstations as part of
the Capital Improvement Plan (CIP) Project. The purchase is through the vendor CDW-G, quote
PXLQ175 in the amount of $60,260.75.
BACKGROUND
The City of River Falls is implementing a standardized five-year workstation replacement lifecycle
to ensure employees have reliable, secure, and efficient technology to perform their daily
responsibilities. Computers that remain in service beyond five years’ experience increased
hardware failures, reduced performance, and are less capable of supporting current software
applications, resulting in decreased productivity and higher maintenance costs.
DISCUSSION
Replacing employee workstations on a five- year lifecycle is a technology best practice that
improves security, reliability, and productivity. Newer workstations provide enhanced security
features, support the latest operating systems and software updates, and reduce the
cybersecurity risks associated with aging hardware. They also improve reliability by minimizing
hardware failures and downtime while providing employees with the performance needed to
efficiently complete their daily responsibilities.
This purchase will replace 29 workstations that are five years old or older as part of the City's CIP.
Standardizing the City's workstation lifecycle will also create a predictable replacement schedule,
allowing for more effective budgeting and long- term technology planning. Staff recommend the
HP EliteBook 8 G2i 14- inch and 16 -inch laptops as reliable, s ecure, and cost -effective
workstations that will support City operations for the next five years.
FINANCIAL CONSIDERATIONS
The quote from CDW-G totals $60,260.75 and includes 16 HP EliteBook 14-inch laptops, 13 HP
EliteBook 16-inch laptops, docking stations, and three-year warranties for all devices.
Memorandum to Mayor Page and City Council
July 14, 2026
Page 2
The 2026 CIP includes a budget of $60,000 for the workstation refresh project. While the proposed
purchase is slightly above the allocated budget, the additional cost of $260.75 is minimal and can
be accommodated within the City's overall technology and capital planning resources.
Sources Uses
Information Technology
Fund $60,000 Purchase of 29 laptops $55,653
IT Annual Budget $260
Purchase of 3 docking
stations $546
3 Year Warranty on 29
laptops $4,060
Total Sources $60,260 Total Uses $60,260
ng Rotation
CONCLUSION
The IT team recommends that the River Falls Common Council approve the purchase of the 29
workstations included in CDW-G Quote Number PXLQ175 in the amount of $60,260.75 and
authorizes the City Administrator to enter into the purchase contract. This investment will
support the City's five-year workstation lifecycle plan by providing secure, reliable, and
productive technology solutions for City staff.
RESOLUTION NO.
RESOLUTION APPROVING THE PURCHASE OF 29 NEW COMPUTER WORKSTATIONS
FROM CDW-G
WHEREAS, the City of River Falls IT team recommends that the River Falls Common Council
approve the purchase of (29) new workstations as part of the Capital Improvement Program, and
WHEREAS, the purchase will be made through the vendor CDW -G, utilizing Quote Number
PXLQ175 in the amount of $60,260.75; and
WHEREAS, the 2026 Capital Improvement Plan includes a budget of $60,000 for the workstation
refresh project, and the additional cost of $260.75 can be accommodated within the City's overall
technology and capital planning resources; and
WHEREAS, the IT team has reviewed the quote and recommends the HP EliteBook 8 G2i 14-
inch and 16-inch laptops as reliable, secure, and cost-effective workstations that will support City
operations for the next five years; and
WHEREAS, replacing employee workstations on a five-year lifecycle is great technology practice
that improves security, reliability, and productivity, and supports the City's long- term technology
planning; and
NOW, THEREFORE, BE IT RESOLVED that the River Falls Common Council authorizes the
purchase of (29) HP EliteBook laptops, docking stations, and three-year warranties from CDW-G
in the amount of $60,260.75, and authorizes the City Administrator to execute all necessary
documents related to the purchase.
Dated this 8
th of July 2026.
______________________________
Alison H. Page, Mayor
ATTEST:
______________________________
Amy White, City Clerk
Hardware Software Services ITSolutionsBrandsResearchHub
CHRIS FEYEREISEN,Thank you for considering CDWG for your technology needs. The details of your quote are below. If you are an eProcurement or single sign on customer, please log into your system to access the CDW site. You can search for your quote to retrieve and transfer back into your system for processing.For all other customers, click below to convert your quote to an order.
PricingandAvailabilityNoticeDuetoongoingsupplychainchallenges,somehardwaremanufacturerscannotguaranteeproductavailabilityorpricinguntiltheproductisshipped.Whilewemakeeveryefforttohonorquotedpricing,ifahardwaremanufacturerincreasesitspricetoCDWafteraquoteisissuedororderisaccepted,wemayneedtoupdateyourquotedpricetoreflectthatchangeirrespectiveofanytimeframesorvalidityperiodssetforthinthequote,includinguptothedateofshipment.Intheeventofapriceadjustment,wewillnotifyyoupriortoshipment.AnypriceadjustmentwouldonlyoccurifthehardwaremanufacturerincreasesitspricingtoCDW.
Convert Quote to Order
QUOTE# QUOTEDATE QUOTEREFERENCE CUSTOMER# GRANDTOTALPXLQ1756/25/2026PXLQ1754337751$60,260.75
QUOTEDETAILSITEM QTY CDW# UNITPRICE EXT.PRICEHP EliteBook 8 G2i 14" Copilot+ PC Notebook - WUXGA - Intel Core Ultra 7 Se 16 9141325$1,904.34$30,469.44Mfg. Part#: D81W3UT#ABAContract: WI Wisconsin Counties Association GOV ONLYHP EliteBook 8 G2i 16" Notebook - WUXGA - Intel Core Ultra 7 Series 3 355 - 13 9141322$1,937.26$25,184.38Mfg. Part#: D81P3UT#ABAContract: WI Wisconsin Counties Association GOV ONLY
HP Care Pack Onsite - 3 Year - Warranty16 7872200$140.00$2,240.00Mfg. Part#: U85BQED81W3UT#ABAElectronic distribution - NO MEDIAContract: WI Wisconsin Counties Association GOV ONLY
HP Care Pack Onsite - 3 Year - Warranty13 7872200$140.00$1,820.00Mfg. Part#: U85BQED81W4UT#ABAElectronic distribution - NO MEDIAContract: WI Wisconsin Counties Association GOV ONLY
Dell Pro Dock WD25Z - docking station - USB-C - HDMI, 2 x DP, USB-C - 1GbE,3 8564428$182.31$546.93Mfg. Part#: DELL-WD25ZContract: WI Wisconsin Counties Association GOV ONLY
Page 2 of 3
SUBTOTAL $60,260.75SHIPPING $0.00SALESTAX $0.00GRANDTOTAL $60,260.75 PURCHASERBILLINGINFO DELIVERTOBilling Address:CITY OF RIVER FALLSACCTS PAYABLE222 LEWIS STRIVER FALLS, WI 54022-2185Phone: (715) 425-0900Payment Terms: VISA
Shipping Address:CITY OF RIVER FALLSJON SMITS222 LEWIS STRIVER FALLS, WI 54022-2185Phone: (715) 425-0900Shipping Method: Pleaseremitpaymentsto:CDW Government75 Remittance DriveSuite 1515Chicago, IL 60675-1515
Sales Contact Info
Anna Bunch | 800.808.4239 | anna.bunch@cdwg.com
LEASEOPTIONSFMV TOTALFMV LEASE OPTIONBO TOTALBO LEASE OPTION$60,260.75$1,727.07/Month$60,260.75$1,974.74/Month
Monthly payment based on 36 month lease. Other terms and options are available. Contact your Account Manager for details. Payment quotedis subject to change. Why finance? Lower Upfront Costs. Get the products you need without impacting cash flow. Preserve your working capital and existing credit line. Flexible Payment Terms. 100% financing with no money down, payment deferrals and payment schedules that match your company'sbusiness cycles. Predictable, Low Monthly Payments. Pay over time. Lease payments are fixed and can be tailored to your budget levels or revenue streams. Technology Refresh. Keep current technology with minimal financial impact or risk. Add-on or upgrade during the lease term and choose toreturn or purchase the equipment at end of lease. Bundle Costs. You can combine hardware, software, and services into a single transaction and pay for your software licenses over time! Weknow your challenges and understand the need for flexibility. General Terms and Conditions: This quote is not legally binding and is for discussion purposes only. The rates are estimate only and are based on a collection of industry datafrom numerous sources. All rates and financial quotes are subject to final review, approval, and documentation by our leasing partners.Payments above exclude all applicable taxes. Financing is subject to credit approval and review of final equipment and services configuration.Fair Market Value leases are structured with the assumption that the equipment has a residual value at the end of the lease term.
NeedHelp?
MyAccount
Support
Call 800.800.4239
Page 3 of 3
About Us |Privacy Policy |Terms and Conditions This order is subject to CDW's Terms and Conditions of Sales and Service Projects athttp://www.cdwg.com/content/terms-conditions/product-sales.aspxFor more information, contact a CDW account manager.
© 2026 CDWGLLC, 200 N. Milwaukee Avenue, Vernon Hills, IL 60061 | 800.808.4239
MEMORANDUM
TO: City Council
FROM: Alison Page, Mayor
DATE: July 14, 2026
TITLE: MAYOR’S APPOINTMENTS
RECOMMENDED ACTION
Consideration of the following appointments:
Appointment of Arriety Lowell to the Plan Commission through May 2029
7
Administrator’s Report
July 28, 6:30 p.m. – Council Meeting
August 11, 6:30 p.m. – Council Meeting
COMMUNITY DEVELOPMENT
Ensure sustained (re)development of the city from the prospect stage through construction
• Brookgreen – Occupancy granted for Buildings 1, 2, 3, 4, 5, 6 and Clubhouse. Buildings 7-10 are under
construction.
• Oak Hill – 5 permits issued, 3 COs issued.
• The Preserve – 0 permits issued, 3 COs issued
• Thompson Heights – 0 permits issued, 3 COs issued
• Wildflower Meadows – 2 permits issued
• The Wildflower Meadows subdivision on Powell Avenue is under construction. Water and Sewer utilities
are currently being installed.
• An annexation petition submitted by the Delbert and Elaine Johnson trusts for approximately 55 acres
south of CTH M at 1060th Street was approved by Council on June 9, 2026.
• An application for a Planned Unit Development Specific Implementation Plan has been submitted for The
Creamery – a brewery, taproom, and event center with four short -term rental units at W. Cedar Street
and River Street. Plan Commission will review the request at their meeting on July 7, 2026.
• An application for site plan approval was submitted for The Whisk, an approximately 10,000 square foot
manufacturing facility in Whitetail Ridge Corporate Park.Librar
y renovations
• The majority of the library remodel is complete.
Safe Streets Action Plan (will be completed in 2026)
• The Safe Streets for All Safety Action Plan was adopted by Council on May 12th.
Downtown Project
• The Safe Streets for All Implementation Grant application has been submitted for a downtown
reconstruction project.
Conservation and Parks Division
• Staff and volunteers have installed the first four pollinator demonstration gardens at DeSanctis Park. The
gardens are located at the Glover Station School House.
Division Street crosswalks
• The Safe Streets for All Action Plan is expected to include a concept plan for an improved pedestrian
crossing at East Division and Wasson Lane.
Stewardship of Public Infrastructure
• The 2026 Mill and Overlay project was awarded to Lepke Trucking and Excavating. Work will occur
starting in July and will occur on Paulson Road. City staff prepared a grant application and anticipates
receiving a Wisconsin Local Roads Improvement Grant for $50,000 to support this project.
• BUILDING PERMITS ISSUED
Permit Type JUNE YTD Permit Value
JUNE
Permit Value
YTD
Building Permits 41 146 $11,115,000 $32,229,000
New Home Permits 7 44 $1,860,000 $11,716,000
8
Mapping
• Map of available sites for development
• Map of active development projects map
POLICE DEPARTMENT
Training
• June 2-4 – Intoximeter EC/IR II 3-Day Basic Breath Examiner Specialist Training – Ofc. Perry, Ofc.
Perronne
• June 3-4 – Advanced Roadside Impaired Driving Enforcement (ARIDE) – Ofc. Zupanc
• June 3 – In-House Training – Ofc. P. Jensen, Ofc. Kober, Ofc. Fleischhacker, Ofc. Olson, Ofc. Horn,
Ofc. Hoffman, Inv. Thomas, Sgt. Walker, Sgt. Hokkanen, Sgt. Bangert
• June 8-10 – Honor Guard-Basic – Ofc. Fairbairn
• June 9-11 – School Resource Officer Conference – Ofc. Amaro, Ofc. Sather
• June 11 – Springfield Armory Armorer – Ofc. Hoffman
• June 11-12 – Pre-Escalation and Defensive Tactics Training for Female Officers – Ofc. Fairbairn, Ofc.
Fleischhacker, Ofc. Olson
• June 15 – Emergency Response Unit (ERU) Training – Ofc. M. Miller, Ofc. Amaro, Ofc Fairbairn, Sgt.
Walker, Sgt. Rudesill
• June 17-19 – WI Law Enforcement Administrative Professionals Training Conference (LEAP) – Kim
Fischer
• June 26 – In-House Training – Ofc. M. Miller, Ofc. Austin, Ofc. Fairbairn, Ofc. Sather, Ofc. Perry, Ofc.
Perronne, Ofc. Amaro, Ofc. B. Jensen, Inv. Miller, Sgt. Anderson, Sgt. Dohmeier, Sgt. Rudesill
• June 29 – Public Records for Law Enforcement – Ailene Splittgerber
• June 29 – Red Dot Instructor Training – Sgt. Anderson, Sgt Bangert
FIRE DEPARTMENT
Run Volume
In June 2026, we responded to a total of 37 calls for service, compared to 28 calls for the same period in
2025. Year to date: 2026 = 202 calls; 2025 = 181 calls.
Activities/Highlights
• The Fire Department completed 36 inspections during June, bringing the 2026 total to 488 inspections.
These inspections continue to support fire prevention, code compliance, and community safety.
• The department hosted a "Bring Your Significant Other to Training" event, with more than 20 family
members participating in a hands -on experience to better understand the training, equipment, and
teamwork required of our firefighters.
• One firefighter completed Wisconsin Large Animal Emergency Response training, enhancing the
department's ability to safely respond to incidents involving horses, cattle, and other large animals.
• We welcomed our newest firefighter, Anna Henn, on June 29. Anna recently moved to River Falls and
also serves as a full -time firefighter with the Hastings Fire Department, bringing valuable experience to
our team.
UTILITIES
Electric
• Maintenance repairs were performed. This is maintenance work found through our required system
inspections.
• Substation monthly inspections completed.
• Underground services continue a weekly/monthly basis. Over 20 new customers last month.
• Meter readings continue each month.
• Junction Falls Hydro is checked each day. We shut off this dam this month to do some small
maintenance to this hydro. We had our Annual FERC on-site inspection last month.
• Miscellaneous service orders to look at trees trimming around service wires and streetlight repairs.
• We had 7 outages affecting 55 customers this month.
• We started Brook Green project update. We will be working on the services to these buildings as they
requested the last building to be energized. We energized building # 10, three buildings left to energize.
• We are holding on to the Sycamore II project with new primary underground and service for their new
building.
• Fire Hall Project update: the permeant service will be installed later this fall.
• We are continuing pole replacement throughout the city. We have started replacing poles from the
1940’s that have passed inspections but deemed to replace because of the age of the poles. This
continues this month.
• We moved some infrastructure at the SkyCoat project for this project.
Customer Service
• Customer Service staff began the disconnection process by sending out disconnection letters on June 5
to 185 residential customers and 13 businesses with a past due balance of $250.00 or more. Outbound
reminder calls were made to 157 customers on June 10. In addition, 31 text messages and 2 personal
calls were sent June 12 as a final form of communication prior to disconnection.
• A total of six disconnections took place on June 15, with an additional disconnection on June 16 for failure
to pay on a payment arrangement. There were 45 payment arrangements in place on June 15 to avoid
disconnections and provide more time to pay off the past due utilities balance.
• Customer Service scheduled 27 service requests for the water department. These included new water
meters to be dropped off, water meter exchanges, as well as water turned off for repairs.
Engineering Technician Work
• Mapped 25 AMI meters changes.
• Inspected and drafted 1 new home lateral.
• Inspected and drafted 1 water service replacement.
• Final resolution to Leica GPS issues.
• Attached more sanitary videos and reports to the mapping system from field crew.
• Assisted B&M locating.
• Continued GPS and mapping for Wildflower Subdivision
• Finished GPS and mapping for Sterling Ponds Industrial 2
• Finished GPS and mapping for Our Neighbors Place
• Finished GPS and mapping for Valley View Apartments -Mann Valley
• Started GPS work on Skycoat
Water/Wastewater department
• Repaired chlorine (CL2) regulator and injectors at Well House 4 and Well House 6.
• CIP discussion with Public Works and Electric Utilities
• CIP review for water and wastewater
• We have not sent a sludge load to West Central Bio Solids since 6-19-26. Waste Management is
servicing the roll-off dumpster for landfill disposal.
• Meter Changeout
• North tower low level. ClaVal was stuck open and was recirculating water. Shut valves to isolate the
ClaVal and tower start to fill. Back to normal operation.
• Spring Creek lift station transducer failed. Replaced transducer with an old lift station that is no longer in
service transducer. Operation is back online and replacement has been ordered.
• Work is underway on the 2025 Lead Service Line consumer notice certification and documentation, in
coordination with the Water/Wastewater Lead and City Engineer (due July 1).
WPPI
• Incentive Programs and Green Blocks
o Total RFMU Program participation (as of July 1, 2026)
29 customers received $9,133 in incentives
o Total River Falls Focus on Energy Participation (as of May 28, 2026)
202 customers received $290,001 in incentives
o Green Blocks Update –
March had 3,547 blocks purchased by 1,240 customers
5,311,800 kWh of renewable energy purchased in 2026.
• Upcoming Events of Interest
o July 23 – WPPI Executive Committee Meeting
o October 8 – Orientation to WPPI
Source: City of River Falls website. First collected Oct 9, 2026.