Page 1 of 4
Community Development Department
222 Lewis Street
River Falls, WI 54022
715.425.0900
www.rfcity.org
MINUTES
PLAN COMMISSION
MARCH 3, 2026
CITY COUNCIL CHAMBERS
Members Present: Rob Gormanson, Diane Odeen, Rebecca Prendergast, Steven Severson,
Michael Woolsey, Dan Toland
Members Absent: Chris Holtkamp
Staff Present: Emily Shively, Harley Mehlhorn, Becky Corson, Jonathan Thoen
CALL TO ORDER
Meeting convened at 6:30 p.m.
APPROVAL OF MINUTES
M/Woolsey, S/Odeen to approve minutes. Motion carried 6/0.
PUBLIC COMMENTS
Sarah Edwards – Spoke on reasons to allow the project The Creamery to move forward. Believes
this will improve the lot and allow for a successful business to grow. It would make an
improvement in the community. Encourages activities with the biking communi ty, for gathering,
and makes a desirable place to fish, kayak, and visit.
Elizabeth Bowden – Spoke on reasons to not allow the project The Creamery to move forward
such as concerns of it being the wrong location for the project, parking pressures, speed of cars
driving in the area, and pedestrian safety.
ORDINANCES AND RESOLUTIONS
Ordinance regarding the rezoning of property at 235 Highway 35 from C Conservancy
District to I-1 Industrial District (Sterling Ponds Industrial II, LLC)
Harley Mehlhorn gave a presentation on the rezoning of the property located at 235 Highway 35
from C Conservancy to I-1 Industrial District. Mehlhorn gave a brief reminder of what the rezoning
district determines for the land and permitted uses of the site.
Mehlhorn gave background on the site location within the Sterling Ponds Corporate Park. The
current zoning classification is Conservancy District, and the request is to rezone to Industrial
District. Mehlhorn indicated the current zoning is due to having b een a separate use when the
corporate park came through. With no legal access to the site, it was zoned Conservancy until it
could be incorporated into Lot J.
1
Page 2 of 4
Mehlhorn explained that the Comprehensive Plan designates the future land use of the subject
site as Corporate Park, and the proposed zoning of Industrial is consistent with that designation.
Mehlhorn covered the next steps in the rezoning process. With co nformance to the
Comprehensive Plan, staff recommends forwarding the ordinance for rezoning to City Council
with a favorable recommendation.
Michael Woolsey made a motion to forward the ordinance regarding the rezoning of property at
235 Highway 35 to City Council with a recommendation for approval. M/Woolsey, S/Gormanson
– carried 6/0
Ordinance regarding the Planned Unit Development General Development Plan for The
Creamery at Cedar, a planned brewery, tap room, and event center at W. Cedar Street and
River Street (Bearcat Investments, LLC)
Harley Mehlhorn gave a presentation on the Planned Unit Development (PUD) General
Development Plan (GDP) for the project The Creamery at Cedar. Mehlhorn described how this
is the first step in the PUD process and establishes the basic right of use and conceptual site
design and architecture for the project.
Mehlhorn covered on how the site is located with the Downtown Transitional Overlay District,
which was adopted by Council in 2006. It is compromised of two special districts, the Central
Business District (CBD), and the Transitional District. The subject p roperty is located within the
Transitional District. Mehlhorn indicated the main difference between the two districts is the
design standards which apply to alterations to existing structures and the development of new
structures. The CBD is intended to ensure downtown character is preserved in the historic block
of Main Street, and the Transitional District intends to keep the buildings in the general style of
downtown but is not as restrictive or limiting as the CBD. There is also an exemption to parking
requirements as long as the use falls under general commercial.
Mehlhorn indicated the subject site is zoned B -1 General Commercial District, which has
historically been limited to the Downtown Core, with all parcels within the CBD being B -1 and a
portion of the parcels within the Transitional District as well. The B -1 District allows for a wide
range of uses, such as general business and commercial, office, bakeries, professional services,
bars, gas stations, hotel, and others deemed compatible with the downtown area. Mehlhorn
indicated the intent of the district is to provide for centrally located, walkable, and compact uses
that are compatible with downtown activit y. The proposed mix use taproom, event center,
restaurant, and hospitably use is compatible with the existing zoning and historic application of
the district.
Mehlhorn covered how the Comprehensive Plan Future Land Use Designation for the site is
Mixed Use category, which encourages vertical mixed-use development downtown, so a mix of
commercial types, and residential types could be in the same or adjacent build ings. Mehlhorn
indicated the Land Use Technical Memorandum specifically identifies downtown along the river
as candidates for infill development with reduced setbacks and parking to accommodate efficient,
human scale, and downtown-compatible development types.
Mehlhorn discussed how the subject site is identified under the Kinni Corridor Plan (KCP). The
KCP outlined a vision for the river and river adjacent development to ensure preservation and
utilization of the city’s greatest natural resource. Mehlhorn indicated districts within plan are
recognized as areas of potential economic revitalization a nd infill development. The KCP also
Page 3 of 4
outlines goals as it relates to the preservation of the Kinni, mainly reducing thermal load from
large parking lots proximate to the river and to reduce impervious surface downtown.
Mehlhorn indicated this site is a complex site with multiple levels of guidance and regulation.
Mehlhorn then moved into the specific proposal of the project. The proposal is for a 17,000 square
foot building that would contain three levels. Level one woul d contain a taproom with a small
restaurant, level two would be the event space for weddings or other gatherings, and the third
story would be for four short term rentals units. Mehlhorn indicated the request is required due to
the unique parking arrangeme nt proposed as part of the PUD. The applicant is proposing that
rather than providing all the required parking on-site, that a mix of on street, on -site, proximate
private parking lots, and a shuttle service accommodate the building’s parking demand.
Mehlhorn displayed a graphic provided by the applicant to illustrate examples of public and
private parking resources proximate to the proposed site. He noted that the request tonight is not
to approve a specific parking plan, but rather to set the framework and conditions under which
the S pecific Implementation Plan (SIP) may approve. Mehlhorn indicated the applicant has
already been in talks with at least two private property owners to utilize their parking lots due to
the peak hours being different for each user. Mehlhorn said with their proposed parking plan, a
combination of on -street, on -site, and private parking agreement would supply the code
mandated 153 spaces for peak occupancy. Staff would recommend no more than 30% of the
total parking demand be provided by on -street parking, and that the remainder come from a
combination of private parking agreements, public lots within a walkable distance, and a shuttle
service from hotels or other larger sites such as Tattersall or an agreement with The Upland.
Mehlhorn indicated staff support the conceptual parking agreement for the following reasons:
firstly, the load of site during peak hour events will be very similar to that of the existing business,
The Garage: bikes and brews, meaning the existing conditions today will be like the conditions
should this proposal be constructed. Second, the zoning and comprehensive plan encourage
infill development on this site and the downtown overlay, just a few hundred feet to the east,
exempts parking for general commercials. Third, the site is downtown and adjacent to the Kinni
with minimal room for on -site parking. Mehlhorn indicated if no parking flexibility is offered it
greatly limits the potential of a site that could be leveraged for economic development and
riverfront activatio n. Finally, t he request is to set up the framework under which a parking
agreement may be approved under the SIP , and the SIP will not be approved until parking
agreements are recorded or parking is satisfactory to code required calculations.
Mehlhorn then covered how the conceptual site plan has the building is centrally located on the
site with parking flanking the western edge along River Street. A connection to the trail is
proposed coming off the eastern side of the site, along with a deck on the northern side. Mehlhorn
indicated stormwater is proposed to be contained in the city pond which the applicant will be
expanding and taking over maintenance of. The plan also shows a Cedar Street cul-de-sac which
is a potential future transportation improvement that would improve circulation for both this site
and Depot/City Station.
Mehlhorn discussed how the proposed architecture is a combination of modern architecture with
the historic vernacular seen in buildings contemporary to downtown’s era of construction.
Mehlhorn said it is a mix of metal, brick, and textured panels proposed as finishing materials. The
building will have windows facing both River Street and the Kinni.
Mehlhorn explained the criteria when someone applies for a Planned Unit Development. Based
on the criteria, Staff found the proposal to be consistent with criteria in the ordinance. Mehlhorn
Page 4 of 4
then listed the next steps in the GDP process. The proposal will go before Council in April. If the
GPD is approved a SIP application will be provided by the applicant and presented to Plan
Commission and Council. The GDP and SIP being approved is a requirement of the PUD’s final
approval. Mehlhorn discussed that the SIP will include details on the specific parking plans and
require the plan to be in place prior to issuance of certificates of occupancy. Mehlhorn indicated
that with conformance with code criteria, the downtown overlay district, the Kinni Corridor Plan,
and the Comprehensive Plan, staff recommends that Plan Commission forward the enclosed
resolution to Council with a favorable recommendation.
Michael Woolsey made a motion to forward the resolution regarding the Planned Unit
Development General Development Plan for The Creamery to City Council with a
recommendation for approval. M/Woolsey, S/Odeen – carried 6/0
Discussion was had on if there would be an elevator, and the limit to the amount in the event
space. Questions were raised about the parking plan that would be put in place for the project.
Mehlhorn indicated this is the framework for a future plan to be adopted. The SIP will allow us to
dig into specifics for the project. Questions were had on the cul-de-sac and when there could be
more information on this. Shively indicated we are in the process of figuring this out and will look
into this more in the SIP process. Shively indicated this area was identified as a location for take-
out kayaks and have access to the river, and part of that plan indicated this location have a cul -
de-sac. With site development this could be a time in which to look into implementing this
infrastructure.
Conversation was had on having some education clarity about parking options as things move
forward in the process.
Planning Update
Emily Shively gave a planning update letting everyone know that at the May 5th meeting the draft
Safe Streets for All Safey Action Plan and the consultant who helped prepare it will be giving a
presentation on what that all includes, and it will than go to Council in May for adoption.
ADJOURNMENT
Commissioner Woolsey made a motion to adjourn at 6:59 p.m. S/Gormanson; motion carried 6/0.
Respectfully submitted,
Becky Corson, Community Development Coordinator