Finance Committee
City of Prescott · Pierce County · meeting of Sep 23, 2026 · Agendas
Open the original document More from City of Prescott
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
CITY OF PRESCOTT
FINANCE COMMITTEE
WEDNESDAY, SEPTEMBER 23
5:00 PM
MUNICIPAL BUILDING
800 BORNER ST
PRESCOTT, WI 54021
1) Call to Order
2) Roll Call
3) Discussion on Concept Plans and Costs for Police, Library, City Hall and Shared
Space Improvements
4) 2026 Budget Overview
5) 2027 Capital Improvement Items Discussion
a) Equipment and Vehicles
b) Well #4 Treatment Project
c) Fairy Wonderland Park Improvements
d) 2027 Mill and Overlay
e) Orrin Road Mill and Overlay
6) 2028 and Beyond Capital Projects
a) Extension of Rydeen Road
b) Long Term Water Improvements
7) 2027 Wages and Personnel
8) Discussion on Long Term Options for 256 Front Street
9) Adjourn
NOTICE
ACCESS TO THE MUNICIPAL BUILDING FOR THE DISABLED IS
AVAILABLE AT THE MAIN ENTRANCE.
ALL THOSE WITH SPECIAL NEEDS SHOULD CALL CITY HALL OFFICES
(715-262-5544) IF ASSISTANCE IS REQUIRED
IT IS POSSIBLE THAT A QUORUM OF THE COMMON COUNCIL OR
OTHER CITY COMMITTEES MAY BE PRESENT AT THIS MEETING. THIS
IS INCIDENTAL AND NO ACTION WILL BE TAKEN BY THE COUNCIL OR
ANY OTHER COMMITTEES.
To: Finance Committee
From: Matt Wolf, City Administrator
Date: September 15, 2026
Subject: Municipal Facilities Concept Planning – Police, City Hall, and Library
Background
In January 2024, Cedar Corporation completed a comprehensive Municipal Facilities
Needs Assessment for the City of Prescott evaluating the existing and future facility
needs of the Police, Fire, EMS, City Hall, and Library. Since that time, the City Council
has held several discussions regarding potential facility improvements and the long-
term location of these municipal services.
As the planning process progressed, the City evaluated several alternatives for a
combined Public Safety Building. Challenges associated with available sites, property
acquisition, costs, and operational considerations resulted in the Council reconsidering
how the Police, Fire, and EMS facility needs could be addressed separately. The
Council subsequently authorized Cedar Corporation to complete updated conceptual
planning focused on the existing City Hall/Library and Police Department properties.
The approved scope directed Cedar Corporation to evaluate renovation of the existing
City Hall/Library building together with an expansion that could accommodate a new
Police Department and shared municipal spaces. The work also included space
planning, site analysis, conceptual layouts, and updated estimates of probable
construction costs.
Discussion
Cedar Corporation has now completed the conceptual planning work. Cedar
Corporation will attend the Finance Committee meeting to present the updated plans,
explain how the proposed spaces are organized, and review the considerations that led
to the current concepts.
The updated concepts maintain the existing City Hall/Library facility while developing a
new Police Department and shared municipal space as an addition to the existing
building. The plans also identify areas for potential future improvements, including a
potential future Fire Department addition and associated driveway, so that the City can
consider how the site could accommodate longer-term municipal facility needs.
At this meeting, the primary purpose is to give the Finance Committee an opportunity to
review the conceptual plans, ask questions of Cedar Corporation, and provide feedback
as the City moves from conceptual planning into consideration of project costs and
financing.
Next Steps
Cedar Corporation is currently developing an updated project cost estimate based on
the completed conceptual plans. That estimate is anticipated to be presented to the City
Council at its September 23, 2026 meeting.
Following the updated cost estimate, City staff will evaluate the potential financial
impact of the project. This analysis will include potential borrowing requirements,
estimated property tax impacts, possible project phasing, available City funding
sources, and other financing considerations.
Staff intends to bring this financial analysis back to the Finance Committee on October
7, 2026. At that meeting, the Committee can review the estimated financial impact and
discuss potential next steps should the City Council determine that it wishes to continue
moving the project forward.
No final decision to proceed with construction is being requested as part of the current
conceptual planning discussion. The upcoming cost and financing analysis is intended
to provide the Council and Finance Committee with additional information necessary to
determine whether, when, and in what form the project should advance.
Recommendation
Review the updated conceptual plans with Cedar Corporation and provide comments or
direction regarding the proposed Police, City Hall, and Library facility concept.
Attachments
Updated Conceptual Planning for Municipal Facilities
PROPERTY ZONING INFORMATION
PROPERTY INFORMATION
ADDRESS:
MUNICIPALITY:
COUNTY:
PROPERTY BUILDING SETBACKS
FRONT YARD SETBACK:
SIDE YARD SETBACK:
REAR YARD SETBACK:
EXISTING PARKING COUNT:
NEW PARKING COUNT:
800 BORNER ST N
1601 PINE ST
CITY OF PRESCOTT
PIERCE
25 FEET
10 FEET
15 FEET
81
64
MATERIAL LEGEND
EXISTING
BUILDING
25' - 0" 10' - 0"
15' - 0"
10' - 0"
CITY HALL
AND LIBRARY
10' - 0"
10' - 0"
POLICE
PROPERTY LINE
BUILDING SETBACK
BORNER ST N
PINE STREET
NORTH
EW
S
PROJECT NORTH
//
IIMUNICIPAL FACILITIES
CITY OF PRESCOTT
09.15.2026 A1
EXISTING SITE PLAN
1" = 40'-0"
EXISTING SITE PLAN
NORTH
EW
S
PROJECT NORTH
PROPERTY ZONING INFORMATION
PROPERTY INFORMATION
ADDRESS:
MUNICIPALITY:
COUNTY:
PROPERTY BUILDING SETBACKS
FRONT YARD SETBACK:
SIDE YARD SETBACK:
REAR YARD SETBACK:
EXISTING PARKING COUNT:
NEW PARKING COUNT:
800 BORNER ST N
1601 PINE ST
CITY OF PRESCOTT
PIERCE
25 FEET
10 FEET
15 FEET
81
64
MATERIAL LEGEND
GRASS ASPHALT
CONCRETE STORMWATER
POND
PROPERTY LINE
BUILDING SETBACK
BORNER ST N
PINE STREET
LIBRARY
POLICE CITY SHARED
EMS
FUTURE TRAIL
HALL
STORMWATER
EXISTING
MECH.
UNDERGROUND
STORMWATER TREATMENT
FUTURE
FIRE
FUTURE
DRIVEWAY
//
IIMUNICIPAL FACILITIES
CITY OF PRESCOTT
09.15.2026 A2
OPTION 01
1" = 40'-0"
CONCEPTUAL SITE PLAN
LIBRARY
EXISTING
COUNCIL
CHAMBERS
EXISTING
AV
COURT
RECORDS
ACTIVE
STOR.
LONG
TERM
STOR.
RECP.
JUDGE
CHAM.
CONFERENCE
CLOSED
SESSION
LOBBY
WORK
ROOM
MECH.
#2
COMMUNITY
ROOM GENERAL
STORAGE STOR.
TR
SCREEN / FENCE
SCREEN / FENCE
MULTIPURPOSE
ROOM
MENS
WOMENS
EL
EV.
ME
CH.
BREAK
ROOM
STAFF
FITNESS
MULTIPURPO
SE STORAGE SALLY PORT
IMPOUND
W
LOCKER
ROOM
RECORDS
PATROL
INTER.
RECP.
WORK
ROOM
CONFE-
RENCE
TR
LOBBY
EVIDENCE
EVID.
PROC.
WEA-
PONS
INTAKE
INTER.
DUTY BAG
STORAGE
TR TR
M
LOCKER
ROOM
INTER.
BREAK
ROOM
STOR.
TR
MECH.
#1
JAN.
LIBRARY
10,240 SF
CITY HALL
6,230 SF
SHARED
6,849 SF
POLICE
17,760 SF
43,319 SF
EXISTING
MECHANICAL
OFFICE
OFFICE OFFICE OFFICE
OFFICE
OFFICE
OFFICE
SQUAD GARAGE
KITCHEN
DINING
BREAK
DAY
ROOM
OFFICE
GARAGE
LOC-
KER
STOR.
STORAGE
EMS
2,240 SF
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
PROJECT NORTH
NORTH
EW
S
AREA LEGEND
TOTAL:
1/16" = 1'-0"
BLOCK DIAGRAM
//
IIMUNICIPAL FACILITIES
CITY OF PRESCOTT
09.15.2026 A3
OPTION 01
1/16" = 1'-0"
DIAGRAMTIC SECTION
NORTH
EW
S
PROJECT NORTH
PROPERTY ZONING INFORMATION
PROPERTY INFORMATION
ADDRESS:
MUNICIPALITY:
COUNTY:
PROPERTY BUILDING SETBACKS
FRONT YARD SETBACK:
SIDE YARD SETBACK:
REAR YARD SETBACK:
EXISTING PARKING COUNT:
NEW PARKING COUNT:
800 BORNER ST N
1601 PINE ST
CITY OF PRESCOTT
PIERCE
25 FEET
10 FEET
15 FEET
81
64
//
IIMUNICIPAL FACILITIES
CITY OF PRESCOTT
09.15.2026 A4
OPTION 02
PROPERTY LINE
BUILDING SETBACK
BORNER ST N
PINE STREET
LIBRARY
POLICE CITY SHARED
EMS
FUTURE TRAIL
HALL
STORMWATER
EXISTING
MECH.
UNDERGROUND
STORMWATER TREATMENT
FUTURE
FIRE
FUTURE
DRIVEWAY
1" = 40'-0"
CONCEPTUAL SITE PLAN
MATERIAL LEGEND
GRASS ASPHALT
CONCRETE STORMWATER
POND
PROJECT NORTH
NORTH
EW
S
//
IIMUNICIPAL FACILITIES
CITY OF PRESCOTT
09.15.2026 A5
OPTION 02
LIBRARY
EXISTING
COUNCIL
CHAMBERS
EXISTING
AV
COURT
RECORDS
ACTIVE
STOR.
LONG
TERM
STOR.
RECP.
JUDGE
CHAM.
CONFERENCE
CLOSED
SESSION
LOBBY
WORK
ROOM
MECH.
#2
COMMUNITY
ROOM GENERAL
STORAGE STOR.
TR
SCREEN / FENCE
SCREEN / FENCE
MULTIPURPOSE
ROOM
MENS
WOMENS
EL
EV.
ME
CH.
BREAK
ROOM
STAFF
FITNESS
MULTIPURPO
SE STORAGE SALLY PORT
IMPOUND
W
LOCKER
ROOM
RECORDS
PATROL
INTER.
RECP.
WORK
ROOM
CONFE-
RENCE
TR
LOBBY
EVIDENCE
EVID.
PROC.
WEA-
PONS
INTAKE
INTER.
DUTY BAG
STORAGE
TR TR
M
LOCKER
ROOM
INTER.
BREAK
ROOM
STOR.
TR
MECH.
#1
JAN.
EXISTING
MECHANICAL
OFFICE
OFFICE OFFICE OFFICE
OFFICE
OFFICE
OFFICE
SQUAD GARAGE
KITCHEN
DINING
BREAK
DAY
ROOM
OFFICE
GARAGE
LOC-
KER
STOR.
STORAGE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
1/16" = 1'-0"
BLOCK DIAGRAM
To: Finance Committee
From: Matt Wolf, City Administrator
Date: September 15, 2026
Subject: 2027 Capital Improvements
Discussion
The City is working to update our Capital Improvement Plan (CIP) this year for 2027-
2033. In 2027 the City of Prescott has several capital projects found within our CIP
(https://www.prescottwi.gov/DocumentCenter/View/960/CIP-2025-2031). We will be
reviewing the 2027 CIP projects with the Finance Committee as follows:
Equipment and Vehicle Replacement
The City of Prescott as part of our Capital Fund has a vehicle replacement program.
This program alternates annually between the Police and Public Works Department.
The Police Department replaced a squad this year so it is Public Works turn for a
replacement. For 2027 the City budgeted $58,300 for the replacement of the 2009
Chevy Pickup truck currently in the fleet. This funding comes directly out of the Capital
levy that is done annually, which is currently set at $389,174 for 2027.
Well #4 Treatment Project
In 2022, the City completed testing of all three municipal wells and determined that
PFAS was present at levels requiring the City to address treatment under the new
federal drinking water standards established by the U.S. Environmental Protection
Agency (EPA) on April 10, 2024.
Under the current federal rule, public water systems must comply with the applicable
PFAS Maximum Contaminant Levels by 2029. The EPA has proposed a rule that would
allow eligible public water systems to request up to a two-year extension, potentially
extending compliance to 2031. That proposal has not yet been finalized. Regardless of
whether an extension is ultimately approved, the City has continued moving forward
with improvements necessary to address PFAS within its drinking water system.
The City has completed improvements to Well No. 3 that bring the well into compliance
with the new PFAS drinking water standards. Well No. 3 had issues with both elevated
nitrate and PFAS concentrations. Because treatment was necessary for both
contaminants, reverse osmosis was selected as the appropriate treatment method.
The City's next priority is Well No. 4. Unlike Well No. 3, Well No. 4 currently requires
treatment for PFAS. Based on the characteristics of the well and available treatment
technologies, anion exchange (AIX) has been identified as the preferred treatment
method. AIX requires a smaller building footprint and can provide PFAS removal
performance comparable to granular activated carbon (GAC).
The City is currently working with Water Surplus to complete a pilot study evaluating
three treatment media:
1. Norit GAC 400
2. Lanxess TP 108 DW AIX Resin
3. ResinTech SIR-110-HP AIX Resin
The Wisconsin Department of Natural Resources (DNR) approved the pilot study
parameters. Water Surplus has completed an interim report showing Lanxess TP 108
DW AIX Resin as the most effective of the three media evaluated to date for PFAS
removal. The interim report has been submitted to the Wisconsin DNR. CBS Squared
has also worked with Water Surplus to develop a full-scale treatment design for Well
No. 4 based on the pilot study results.
The current estimated cost of the full-scale Well No. 4 treatment project is $4,427,000.
The City has submitted the project for funding consideration through the Wisconsin
DNR Safe Drinking Water Loan Program's Emerging Contaminants Program. This
program is specifically intended to assist communities with projects that reduce or
eliminate PFAS from drinking water.
Under the current program, eligible emerging-contaminant projects may receive
principal forgiveness of up to 70% of eligible project costs. Because Prescott has a
population of fewer than 5,000 residents and may qualify under the program's
disadvantaged-community criteria. Final funding will depend on the DNR's review and
allocation process.The City anticipates receiving a final determination regarding its
funding allocation in October 2026.
The City has also submitted the Well No. 4 project for federal appropriations/Community
Project Funding consideration through Rep. Van Orden and Senator Smith’s office.
The project has preliminarily been included for federal funding consideration at
$700,000. However, the Wisconsin DNR has informed the City that any federal
appropriation received for the project would reduce the amount of principal forgiveness
available through the Safe Drinking Water Loan Program. If that occurs, the federal
appropriation could provide little or no net financial benefit to the City or its water utility
customers compared with receiving the equivalent amount through DNR principal
forgiveness.
Because the project involves the City's regulated water utility, it is also subject to review
and approval by the Public Service Commission of Wisconsin (PSC). The project has
been submitted to the PSC for consideration.
In its preliminary review, PSC staff provided the following estimated rate impact:
Commission staff estimates that implementation of the proposed water project would
result in the need to increase customer water rates by approximately 34 percent.
Currently, the average Residential customer who uses 3,000 gallons of water per month
pays a water bill of $34.16 per month. The 34 percent rate increase will result in an
average Residential customer water bill of $45.77 per month.
This City has already made a water rate adjustment previously to fund improvements on
Elm, Locust, and Washington Streets, as well as the Well No. 3 treatment project. As
part of those improvements, the City increased water rates by approximately 86%.
Those rate adjustments were reviewed and approved by the Public Service Commission
of Wisconsin as part of PSC Case No. 4850-WR-102.
The City of Prescott is also a participant in multidistrict national litigation against
manufacturers of PFAS. As a result of that litigation, the City has received approximately
$803,461 to date that is available to help offset PFAS-related costs.
The City is proposing to combine these litigation proceeds with available Water Utility
fund balance and DNR principal forgiveness to minimize or potentially eliminate the
amount of additional borrowing required for the Well No. 4 project.
Well #4 Treatment Financing
Total Project Cost $4,427,000
SDWLP-EC (70% EC) $3,098,900
Multi-District PFAS Litigation $803,461
City's Water Fund Balance $539,039
The final project cost will not be known until construction bids are received, which is
anticipated in January 2027. The plans and specifications will be presented to the City
Council for approval, and the Council will also be asked to approve the final construction
contract and financing plan.
The ultimate financing structure will depend on several factors, including:
• The actual construction bids received;
• The final amount of DNR principal forgiveness awarded;
• Council approval of PFAS litigation proceeds available;
• The amount of Water Utility fund balance the Council chooses to apply to the
project; and
• Final approval from the Wisconsin DNR and Public Service Commission of
Wisconsin.
Once those items are known, the City will be able to determine the final amount, if any,
that must be financed through the Water Utility and the corresponding effect on
customer water rates.
Attachments
1. Site and Grading Plan – Well #4 Improvements
2. Exterior Renderings – Well #4 Improvements
Fairy Wonderland Park Improvements
As a result of grant funding received for the Elm/Washington Street project after the City
completed its 2023 borrowing, the City currently has a surplus of $1,138,457 in its
Capital Projects Fund. These funds were allocated to two projects planned for 2027 in
order to eliminate the need for additional borrowing.
The first project is the 2027 Mill and Overlay Program, which will be discussed in the
next section. The second project is the planned improvements to Fairy Wonderland
Park, for which the City originally set aside $683,567.
Fairy Wonderland Park is a partnership project between the City and Healing Play, Inc.,
formalized through a Memorandum of Understanding for improvements to the park.
Healing Play, Inc. has raised more than $500,000 toward the installation of Phase 1 and
Phase 2 playground equipment.
In 2023, the City Council approved a concept plan for Fairy Wonderland Park that
incorporated the improvements being pursued by Healing Play, Inc. The concept plan
included a stormwater pond, parking lot, future phases of playground equipment, solar
lighting, a youth soccer/football field, restrooms, and other minor park amenities.
For the third and final phase, the City and Healing Play, Inc. worked together to submit a
grant application to the Wisconsin Department of Natural Resources (DNR) for funding
through either the Knowles-Nelson or Land and Water Conservation Fund.
The total estimated cost of the project, including the Phase 3 playground equipment
improvements being coordinated by Healing Play, Inc., is $959,210. The original grant
request was for 50% of the estimated project cost, or $479,605.
On September 18, 2025, the City was notified by the Wisconsin DNR that it had been
awarded $387,594 through the Land and Water Conservation Fund. Based on the
current project estimate, this would leave approximately $571,616 to be funded by the
City through the Capital Projects Fund for a total savings of $111,951.
Because the Land and Water Conservation Fund is a federal program administered in
Wisconsin through the DNR, the City must receive and execute the formal grant
agreement before contracts can be awarded or equipment can be ordered. The City has
not yet received the grant agreement. As a result, both the City and Healing Play, Inc.
are currently awaiting execution of the grant agreement before proceeding with the next
phase of the project.
Once the grant agreement is executed, the City will work with Cedar Corporation to sign
a contract to complete the design and bidding process for the planned improvements.
Construction bids will then determine the final project cost. At the same time, Healing
Play, Inc. will be able to begin ordering the equipment planned for installation as part of
the third and final phase.
Attachments
1. Fairy Wonderland Park Concept Plan
2027 Mill and Overlay Project
The second project planned as a result of the additional funding received for the
Elm/Washington Street project is the 2027 Mill and Overlay Project identified in the
2025–2031 Capital Improvement Plan.
The project was originally planned as a mill and overlay of portions of Monroe, Warren,
Lawrence, and Walter Roads, along with full length road mill and overlay improvements
on Mississippi, Wacota, and Cedar Streets. The Capital Improvement Plan includes a
total project budget of $564,617 for this work.
After further discussion with the Public Works Department, staff is recommending that
the project be changed from a traditional mill and overlay to a reclamation and overlay
project.
The primary difference between the two methods is how the existing pavement is
handled. With a traditional mill and overlay, the existing asphalt surface is milled and the
removed material is hauled off-site. With reclamation, the existing pavement and
underlying material are pulverized and recycled in place to create a new and improved
base for the roadway.
Reclamation is being recommended in part because there is no curb and gutter
throughout much of the project area. Over time, sediment has accumulated along the
edges of the roadway, gradually raising the adjacent grade. As a result, portions of the
roadway now sit lower than the surrounding ground, which can cause stormwater to
collect on the pavement rather than properly drain away.
This standing water contributes to premature deterioration of the asphalt and increases
ongoing maintenance needs. Reclamation would help partially address this issue by
allowing the roadway profile to be raised as part of the reconstruction process,
improving drainage and extending the useful life of the pavement.
The most permanent solution would be to install curb and gutter throughout the project
area. However, doing so would significantly increase the overall project cost and would
likely require additional storm sewer and related infrastructure improvements.
Following reclamation, the roadway would receive approximately 3.5 inches of asphalt,
compacted to approximately 3 inches, consisting of both a base course and a wear
course. This approach allows the City to reuse the existing roadway material while
providing a more substantial reconstructed base than a traditional mill and overlay.
The City plans to develop the bid package in October 2026, with construction
anticipated during the spring or summer of 2027. Historically, although the City has
solicited bids from multiple asphalt contractors for similar projects, Monarch Paving has
been the only contractor to submit a bid. Staff will again solicit competitive bids for the
2027 project in an effort to obtain the most favorable pricing available.
Attachments
1. 2027 Mill and Overlay Project Map
Orrin Road Mill and Overlay Project
Originally the Orrin Road Mill and Overlay project was part of a larger project that
included the installation of a sidewalk or multi-use path. This project originally was
estimated at $1,545,350. However, the City moved forward with submitting a TAP Grant
through the Wisconsin DOT for planning pedestrian improvements along US Highway
10, which was approved. As a result, of that planning effort the City moved forward with
a construction and design grant for those improvements, which the construction portion
was approved in August of this year by the Wisconsin DOT. The construction of these
pedestrian improvements will not take place until 2030.
However, the condition of Orrin Road does necessitate that these improvements are
done sooner. This mill and overlay would include the section of Orrin Road from Pearl
Street to Campbell Street. Then from Filkins Street to Dexter Street. The section of Orrin
Road from Campbell Street to Filkins Street would not be included as it is planned to be
closed for a pedestrian multi-use path as part of the pedestrian improvements in 2030.
The City has moved forward with borrowing for the design of these improvements and
as part of that borrowing included $457,627 for the mill and overlay of Orrin Road.
Similarly to the 2027 Mill and Overlay Project a bid package would be prepared this
October. Public Works would be doing curb and gutter repairs so the work would not
begin until summer of 2027.
Attachments
1. Orrin Road Mill and Overlay Project Map
890
890
889
891
891
892 892
890
889889889 889
891
101EXIST. WELL ROOMA100EXIST. CHEM. ROOMA 102WATER TREATMENT ROOMA
103STORAGEA
DS
DS
FFE=892.78892891890890891892
892891890890
891892
891
890890FFE=892.78
-20.11%-10.37%
WELL #4ADDITIONPRESCOTT, WIPRELIM SITE & GRADING PLANC103VERT. SCALE:HORIZ. SCALE:DRAWN BY:
PROJECT NO.CHECKED BY:DATE:
SHEETREVISIONSENGINEERS - SURVEYORS - ARCHITECTS770 Technology WayChippewa Falls, WI 54729Phone: 715.861.5226www.cbssquaredinc.comDATE:DESCRIPTION:1" = 10'XXX--/--/----XXX----------
PROPERTY LINEPROPERTY LINE
PROPOSED NEWASPHALT
REPAVE EX.DRIVEWAY
10.15
17.19
PROPOSEDBUILDINGADDITION
OPTION 1 AERIAL VIEW- NO SCALE
EXISTINGNEWADDITION
WATER TREATMENT PLANT - WELL 4ADDITION CONCEPTS APRIL 10, 2026 PRESCOTT, WISCONSIN
OPTION 1 PERSPECTIVE VIEW 1 - NO SCALE
WATER TREATMENT PLANT - WELL 4ADDITION CONCEPTS APRIL 10, 2026 PRESCOTT, WISCONSIN
OPTION 1 PERSPECTIVE VIEW 2 - NO SCALE
WATER TREATMENT PLANT - WELL 4ADDITION CONCEPTS APRIL 10, 2026 PRESCOTT, WISCONSIN
C O R P O R A T I O N
STORMPOND
SOCCER FIELD RESTROOMS
CITY OF PRESCOTTFAIRY WONDERLAND PARKCONCEPT PLAN
EXISTINGTRAIL
FAIRY WONDERLANDCONCEPT LAYOUT
PEARL STREET
CANTON STREET
FENCE
PARKING LOT
PARALLEL PARKING(TYP) 29 STALLS
RELOCATEEXISTINGTRAIL
21 STALLS
LIGHT POLES(TYP) 2
SOLAR LIGHT(TYP)60' SPACING
BICYCLE RACKS
To: Finance Committee
From: Matt Wolf, City Administrator
Date: September 16, 2026
Subject: Ryden Road Extension
Background
In 2021, the City of Prescott purchased approximately 150 acres of land for the
expansion of the Prescott Business Park. The acquisition was intended to provide the
City with land to support long-term commercial and industrial growth. The City currently
owns approximately 150 acres, with roughly 143 acres being actively marketed for
development and approximately seven acres retained for potential future municipal use.
As part of preparing the property for future development, the City established Tax
Incremental District No. 6 in September 2024. TID #6 was created as a Mixed-Use
District to assist with public infrastructure and other incentives necessary to support
development within the Business Park. The district was created September 30, 2024,
and has an expenditure period extending through September 30, 2039.
In 2025, Cedar Corporation was hired to complete preliminary engineering for the
extension of Ryden Road (see attached), including an overall grading plan, preliminary
stormwater pond modeling, utility layout, sewer lift station layout, and a preliminary
construction cost estimate. The purpose of this work was to better define the
infrastructure costs necessary to serve the Business Park and allow the City to have
more meaningful discussions with prospective businesses.
The preliminary engineering was particularly important because earlier inquiries
included businesses seeking smaller parcels of approximately five to six acres. Without
the Ryden Road extension and supporting infrastructure, smaller projects are difficult to
accommodate because an individual development may not generate sufficient
increment to independently support the cost of extending the necessary infrastructure.
In March 2026, the City approved an agreement with IAG Commercial to provide
professional brokerage services for the Business Park. The purpose of the agreement
was to expand the City's market reach, provide professional real estate expertise, and
more actively promote the property to developers, site selectors, and commercial and
industrial users.
As part of discussions with IAG regarding how to improve the marketability of the
Business Park, IAG recommended that the City develop a master planning concept that
would allow prospective users to more clearly visualize development opportunities on
the property.
Following review of proposals, the City retained Ayres Associates in 2026 to develop a
three-dimensional master concept and visualization package for the Business Park. The
work is intended to provide realistic, market-ready images showing potential roadways,
parcels, grading, stormwater facilities, buildings, landscaping, and other site features.
These materials can be used by both the City and IAG for economic development
recruitment, marketing, presentations, grant applications, and future infrastructure
planning. A preliminary 2D layout has been completed and is attached. Ayers is now
working on creating the 3D layout of the business park.
Collectively, the City has now taken several significant steps to position the Business
Park for development: acquisition of the property, creation of TID #6, preliminary
infrastructure engineering, professional brokerage services, and development of a
master concept plan.
Discussion
The next significant step is construction of the extension of Ryden Road, which is
necessary to make additional portions of the Business Park development ready.
Although the City can currently market the property, the lack of an improved roadway
and municipal utility extensions creates limitations for prospective users. Smaller
businesses cannot easily access individual development sites without a significant
upfront infrastructure investment. At the same time, larger industrial and commercial
users frequently seek sites where road and utility infrastructure is either already
available or can be constructed within a predictable development schedule.
Waiting until a specific development is secured before beginning the infrastructure
process can place the City at a competitive disadvantage when businesses have
compressed site-selection and construction timelines.
Staff is therefore asking Council to consider construction of the Ryden Road extension
and associated infrastructure in 2028. Establishing 2028 as the anticipated construction
year would allow sufficient time during 2027 to complete final engineering, permitting,
financing, bidding, utility coordination, and other project preparation.
The proposed project would include the roadway extension together with storm sewer,
sanitary sewer, water main, stormwater improvements, and related miscellaneous
construction necessary to provide development access to additional Business Park
parcels.
The proposed financing concept would divide the project between TID #6 and the City's
utility funds.
The street, storm sewer, and miscellaneous portions of the project would be financed
through a borrowing to be paid by TID revenues. For planning purposes, the
construction estimates have been adjusted to include approximately 10% inflation from
the original construction costs to a 2028 construction year.
PROPOSED FINANCING MODEL - RYDEN ROAD EXTENSION
Sources
Future 2028 Borrowing $1,154,670
Water Fund $391,215
Sewer Fund $915,750
Total $2,461,635
Uses
Sewer Improvements $915,750
Water Improvements $391,215
Storm Sewer Improvements $300,575
Street Improvements $639,870
Miscellaneous $214,225
Total $2,461,635
The current TID #6 financial model incorporates the Ryden Road borrowing into the
district's projected cash flow. The borrowing anticipates approximately $103,852 in
annual Ryden Road-related expenses during the debt repayment period of 15 years
ending in 2045. The attached TID #6 T ax Increment Forecast, shows that the district
could handle these payments. Due to the increase in value from increment in existing
land/improvements and new improvements driving future revenues from CapVest and
Foley. The sanitary sewer and water portions of the project would initially be funded
through their respective utility funds rather than through the TID borrowing.
If Council would like to move forward with construction in 2028, a determination can still
be made if all or some of the utility funded improvements should be reimbursed by TID
#6. This funding model allows the City to proceed with needed infrastructure without
requiring TID #6 to immediately finance the entire project while preserving the City's
ability to reimburse the utility funds if future Business Park development generates
sufficient increment.
The benefits of the extension of Ryden Road:
• Expands the Marketability of the Business Park
• Creates Development-Ready Sites.
• Supports Faster Development Timelines
• Makes Smaller Parcels End Users Viable
• Reduces Reliance on a Single Large User.
• Improves the City's Ability to Respond to Development Inquiries
• Positions the Business Park for Long-Term Growth
Recommendation
Consider adding Ryden Road to the City’s Capital Improvement Plan for 2027-2033 for
a 2028 construction timeline.
Attachments
1. Cedar Corporation Preliminary Plans for Ryden Road Extension
2. Ayers 2D Concept Plan
3. TID #6 Financial Forecast Model
C O R P O R A T I O N● ●
Preliminary
07/30/2025
C O R P O R A T I O N● ●
C O R P O R A T I O N● ●
C O R P O R A T I O N● ●
C O R P O R A T I O N● ●
C O R P O R A T I O N● ●
C O R P O R A T I O N● ●
LOT 1(25.32 AC)
LOT 2(6.40 AC)
LOT 3(9.65 AC)
LOT 6(6.61 AC)LOT 7(3.68 AC)
LOT 11(13.78 AC)
LOT 10(7.66 AC)
LOT 15(3.36 AC)LOT 14(3.04 AC)
LOT 18(2.29 AC)OUTLOT 20(4.89 AC)LOT 17(1.96 AC)LOT 16(2.24 AC)
LOT 13(2.80 AC)LOT 12(3.30 AC)
LOT 8(4.61 AC)LOT 9(6.12 AC)
LOT 4(12.68 AC)LOT 5(12.69 AC)
LOT 19(2.63 AC)LOT 21(1.63 AC)
NORTH0150300
File: C:\ACC\ACCDocs\Ayres Engineering Services\Prescott Business Park\Project Files\3.Production\Civil3D\Exhibits\Concept Layout.dwg | Layout: Exhibit (2) | Plot Date: 31/08/2026
PRESCOTT BUSINESS PARK - PRESCOTT, WI | CONCEPT LAYOUT8/26/2026Ayres Associates | ################################################ | ############ | www.AyresAssociates.com | # 51-7323.00
City of Prescott, WI
Tax Increment Forecast
TID No. 6
District Classification Mixed-Use
Creation Year 2024
Creation Date 9/30/2024
End of Expenditure Period 9/30/2039
Maximum Life of District (Final Year) 2044
Final Revenue Year 2045
95% 90% Projected
0% Total Total Foley CapVest Projected Ryden Total Projected TID No. 6
Construction Value Revenue Inflation New TID Value Projected Projected Pay-Go Pay-Go Other Road Projected Annual Cash
Year Year Year Factor Development Increment Tax Rate Tax Revenue Revenue $197,603 $4,545,000 Expenses Expenses Expenses Results Balance
2022 2023 2024 - - - - - - -
2023 2024 2025 - 16.56 - - - - -
2024 2025 2026 - 984,800 17.01 16,748 16,748 - 16,748 16,748
2025 2026 2027 - - 4,312,400 17.01 73,337 73,337 - 73,337 90,085
2026 2027 2028 - 1,794,400 6,106,800 17.01 103,853 103,853 28,996 28,996 74,857 164,943
2027 2028 2029 - 5,990,705 12,097,505 17.01 205,732 205,732 28,996 28,996 176,736 341,679
2028 2029 2030 - 5,705,433 17,802,938 17.01 302,760 302,760 28,996 179,056 208,052 94,708 436,387
2029 2030 2031 - 3,423,260 21,226,198 17.01 360,977 360,977 28,996 231,463 103,852 364,311 (3,334) 433,053
2030 2031 2032 - - 21,226,198 17.01 360,977 360,977 28,996 231,463 103,852 364,311 (3,334) 429,719
2031 2032 2033 - - 21,226,198 17.01 360,977 360,977 28,996 231,463 103,852 364,311 (3,334) 426,384
2032 2033 2034 - - 21,226,198 17.01 360,977 360,977 28,996 231,463 103,852 364,311 (3,334) 423,050
2033 2034 2035 - - 21,226,198 17.01 360,977 360,977 231,463 103,852 335,315 25,662 448,712
2034 2035 2036 - - 21,226,198 17.01 360,977 360,977 231,463 103,852 335,315 25,662 474,374
2035 2036 2037 - - 21,226,198 17.01 360,977 360,977 231,463 103,852 335,315 25,662 500,035
2036 2037 2038 - - 21,226,198 17.01 360,977 360,977 231,463 103,852 335,315 25,662 525,697
2037 2038 2039 - - 21,226,198 17.01 360,977 360,977 231,463 103,852 335,315 25,662 551,359
2038 2039 2040 - - 21,226,198 17.01 360,977 360,977 231,463 103,852 335,315 25,662 577,021
2039 2040 2041 - - 21,226,198 17.01 360,977 360,977 231,463 103,852 335,315 25,662 602,682
2040 2041 2042 - - 21,226,198 17.01 360,977 360,977 231,463 103,852 335,315 25,662 628,344
2041 2042 2043 - - 21,226,198 17.01 360,977 360,977 231,463 103,852 335,315 25,662 654,006
2042 2043 2044 - - 21,226,198 17.01 360,977 360,977 231,463 103,852 335,315 25,662 679,667
2043 2044 2045 - - 21,226,198 17.01 360,977 360,977 231,463 103,852 335,315 25,662 705,329
REVENUE EXPENSES BALANCES
To: Finance Committee
From: Matt Wolf, City Administrator
Date: September 16, 2026
Subject: Long-Term Water Improvements
Background
On June 9, 2025, the Common Council adopted Resolution 35-25 approving the CBS
Squared, Inc. Water Engineering Report. The resolution authorized submittal of the plan
to the Wisconsin Department of Natural Resources and applications for Safe Drinking
Water Loan Program for Well #4 and other funding. It also supported Alternative 1 as
the preferred approach capital model for future design, funding, and DNR approval (see
alternative 1 map attached).
Alternative 1 calls for treatment at existing Well #4. The report also evaluated long-term
nitrate trends and treatment options at a future Well #5. The table below has Well #4
treatment as the first major project and includes a Well #5 test well and a treated Well
#5 as future source-capacity projects.
Future Water Improvements
Item
Estimated
Year Cost
Well #4 Treatment Addition 2027 $4,475,000*
Well #5 Test Well 2028 $125,000
Water Main Looping/Redundancy 2028 $770,000
Rydeen Road Extension 2028 $355,650
Court Street Water Main Replacement 2029 $473,250
Well #5 with Treatment 2030 $5,320,000*
Meter Replacement #1 2030 $150,000
Meter Replacement #2 2031 $150,000
Meter Replacement #3 2032 $150,000
Meter Replacement #4 2033 $150,000
Water Tower in Great Rivers 2035 $3,590,000
*This is the full cost, however financial modelling assumes only 30% funding from the
water utility due to 70% funding coming from the Wisconsin DNR Safe Drinking Water
Loan Program.
Discussion
Well Treatment Funding
The costs for treatment at both Well #4 and #5 depends on a 70% principal-forgiveness
assumption for to treat for PFAS through the Safe Drinking Water Loan Program.
Principal forgiveness functions like a grant because that portion of an eligible loan does
not have to be repaid. The remaining 30% would remain a City responsibility.
Treatment Project Project Cost Estimate 70% P. F. 30% City Share
Well #4 Treatment Addition $4,475,000 $3,132,500 $1,342,500
Well #5 with Treatment $5,320,000 $3,724,000 $1,596,000
Projected Water Fund Balances
Below is a table that outlines the improvements in the water utility. The fund balance
begins at $1,841,757 and adds annual cash generated by the utility. The projected
ending balance reflects balance minus the capital improvements. The cumulative
resources column shows the starting balance plus annual additions before deducting
projects. Values are planning estimates, which assume a general 3% annual growth in
revenue by taking simplified rate increases starting in 2028. Operational expenses were
also annually adjusted based on historical expenses by category.
One item to note in this table is that the Well #5 treatment project assumes the water
utility will be responsible for $1,596,000, representing 30% of the estimated project cost.
Funding this share will require the City to complete another full rate case study to
establish water utility rates sufficient to support the improvements. This estimate also
assumes that the City will receive a 70% principal forgiveness through the Safe Drinking
Water Loan Program. If the City receives less than 70% principal forgiveness, the water
utility’s share of the project will increase.
The City must also determine how to address the projected deficit associated with
constructing a new water tower in 2035. Under the current projections, the project would
result in a negative water utility balance of $384,091. A clearer financial picture will be
modelled as we get closer the construction of the water tower.
Current Balance:
Annual Projected
Revenues
Water Fund
Balance Year-End
Culumative Cash - No
Capital Costs
2026 $1,841,757
2027 $383, 367 $882,624 $2,225,124 Well #4 Treatment - 30% Cash Payment
2028 $411,479 $43,453 $2,636,603 Test Well #5, Water Main Looping, and Rydeen Road Extension
2029 $556,357 $126,560 $3,192,960 Court Street Main Replacement
2030 $559,313 $535,873 $3,752,273 Well #5 Treatment and Meter #1 Replacement
2031 $584,799 $970,672 $4,337,072 Meter #2 Replacement
2032 $610,877 $1,431,549 $4,947,949 Meter #3 Replacement
2033 $636,656 $1,918,205 $5,584,605 Meter #4 Replacement
2034 $632,187 $2,550,392 $6,216,792
2035 $655,517 -$384,091 $6,872,309 Water Tower Great Rivers
2036 $684,050 $299,959 $7,556,359
Proposed Water Improvements 2027 - 2035
Unknown Service Lines
Another item not included in this long-term capital plan is the testing and identification of
potential lead service lines. The City has more than 200 water service lines with
unknown materials, as shown on the City’s GIS lead service line map:
https://prescottwi.maps.arcgis.com/apps/webappviewer/index.html?id=dd3169d6d07949
1babec31cffd1b04dd
In August, the Wisconsin DNR notified the City that funding is available to help
communities identify service lines with unknown materials. This work would be
completed in partnership with Jacobs Engineering at no cost to the water utility.
Accordingly, the City has not included a cost estimate for this work and will reevaluate
its funding needs after additional program information becomes available later this year.
Recommendation
1. Confirm moving forward with the alternative #1 improvements as approved in
Resolution 35-25.
2. Discuss the placement and location of Well #5 for drilling a test well in 2028.
Attachments
1. Water Engineering Report – Alternative #1
W
W
W
W
W
W WW
W
W
W
W
W
W
W WW
W
W W
DEXTER ST
WALNUT ST
NORTHERN LIGHTS DR
ST CROIX ST
EXISTINGWELL ηϰ
01VERT. SCALE:HORIZ. SCALE:DRAWN BY:
PROJECT NO.CHECKED BY:DATE:
SHEETREVISIONSENGINEERS - SURVEYORS - ARCHITECTS770 Technology WayChippewa Falls, WI 54729Phone: 715.861.5226www.cbssquaredinc.comDATE:DESCRIPTION:CDV2024.07.24JISPRESC24002WATER STUDYCITY OF PRESCOTT, WIALTERNATIVE 1
EXISTING WATER MAIN (TYP)
&UTURE WTPAT WELL ηϰ
&UTURE WELL η5 WELLHOUSE Θ WTP
WATER MAIN LOOPOPTION ϭ WATER MAIN LOOP
STH 35
DEXTER ST
HILLSIDE DR
PLEASANT DR
ALTERNATE ϭ ENE&ITS͗·P&AS TREATMENT AT WELL ϰ·WELL 5 WITH ϭ͕ϬϬϬ GPM CAPACITY·ϭ͕ϬϬϬ GPM NITRATE TREATMENT AT WELL 5 (DEPENDING ON TESTWELL WATER YUALITY RESULTS)·LOOPING DISTRIUTION SYSTEM IN GREAT RIsERS NEIGHORHOOD·WATER TOWER IN GREAT RIsERS NEIGHORHOOD͕ EXISTINGWATER TOWER TO E DECOMMISSIONED
WASHINGTON ST
&UTURE WATER TOWER
WATER MAIN LOOPOPTION Ϯ
To: Mayor and Council
From: Beth Lansing, Treasurer
Date: September 14, 2026
Subject: 2027 Wages and Personnel
Background
As we work through the 2027 budget, I wanted to provide an overview of what we are
proposing for employee wages and benefits and how those changes affect the budget.
In 2022, the city adopted a five-step pay schedule.
The purpose of the schedule was to provide a consistent way to establish starting
wages and allow employees to move through the steps as they gain experience and
meet the requirements of their position. This also keeps us competitive with
surrounding like sized communities.
Currently, all the steps are fully funded in the current budget except for the Public Works
Foreman position.
For 2027, the proposal is to continue using the current pay schedule and allow
employees to move up a step when they are eligible. In addition to step movement, we
are proposing a 3% COLA increase across the board for City employees.
Police wages are handled separately because they are covered by a union agreement.
The agreement provides for a 4% increase in 2027, which has been included in the
budget.
WRS rates increased from 7.20% to 7.25% for all employees who are not police officers
and decreased from 14.8% to 14.54% for police officers. FICA rates remain steady at
7.65%
Discussion
The proposed wage increases result in the following additional costs:
Fund 2027 Wage
Increase
WRS Increase FICA increase Total Increase
General Fund $58,288.14 $4,983.83 $4,459.04 $67,731.01
Fire Department $1,761.45 $137.88 $134.75 $2,034.08
Library $9,838.42 $833.48 $752.64 $11,424.54
Water $19,411.36 $1,533.92 $1,484.97 $22,430.25
Sewer $15,531.09 $1,254.80 $1,188.13 $17,974.02
Storm Water $4,109.65 $329.61 $314.24 $4,463.50
Total $108,940.11 $9,073.52 $8,333.77 $126,057.38
The largest increase is in the General Fund at $67,731.01. Of that amount, $36,003.46
is related to Police wages and reflects the 4% increase required under the union
agreement.
The remaining General Fund increase reflects the 3% increase given to nonunion police
officers, along with employees moving to the next step on the pay schedule.
Benefits
Health insurance is another area we need to consider as part of the 2027 budget.
Our health insurance premiums are expected to increase by approximately 6% in 2027.
While that is an increase in the premium rates, the actual impact on the City's budget is
an overall decrease to the budget.
We are seeing a decrease in health insurance costs in several departments of around
$100,892.57. This is a result of employees choosing to opt out of the City's health
insurance plan. We are also seeing younger employees enrolled in the City's plan,
which generally results in lower premium costs than some of the coverage we have had
in previous years. See graph below for a breakdown of the increase/decreases.
Fund 2027
Decrease/Increase
General Fund $(45,786.64)
Library $1,025.41
Water $(24,440.33)
Sewer $(24,440.33)
Storm $(7,250.69)
Total $(100,892.57)
Recommendation
Overall, I believe the proposed wage and benefit budget is a reasonable approach for
2027.
This approach allows us to continue to provide competitive and consistent wages for our
employees while still being mindful of the impact on the City's budget and taxpayers.
Staff recommends including the proposed wage increases, step movement, and
anticipated benefit costs in the 2027 budget.
To: Mayor and Council
From: Beth Lansing, Treasurer
Date: September 14, 2026
Subject: 256 Front Street
Background
The former tenant has moved out of 256 Front Street. With the property now vacant, the
City needs to begin considering the long-term use of the property.
The property is currently zoned C-1 Commercial but has historically been used as a
single-family, two-bedroom residence. As a result, the residential use is considered a
legal nonconforming use.
This memo outlines three potential options for Council consideration:
1. Start to use the property as a short-term rental;
2. Continue the property as a long-term rental; or
3. Sell the property for commercial use and return it to the tax roll.
The financial figures included below are preliminary estimates based on discussions we
had with a real estate professional and should be considered estimates for purposes of
comparing the options. Additional analysis, including legal and zoning review, would be
necessary before pursuing any option.
Discussion
Option 1: Short Term Rental
From a financial standpoint, a short-term rental appears to be the most profitable option.
The City has identified a local business owner who would be willing to manage the
property on the City's behalf. Having a third party manage the property could reduce the
amount of day-to-day involvement required from City staff while allowing the City to
retain ownership of the property.
Based on preliminary estimates, the property could generate approximately $40,000 in
net annual revenue as a short-term rental. This estimate is subject to actual occupancy,
rental rates, management costs, utilities, maintenance, repairs, furnishings, insurance,
taxes or fees, and other operating expenses.
Before proceeding, however, there are important legal and regulatory questions that
would need to be addressed.
Legal Considerations
1. The City Attorney is currently looking over this option and will be advising
whether the City itself has the legal authority to own and operate a short-term
rental property as a municipal activity.
2. If the City cannot directly operate the property as a short-term rental, another
potential structure would be to lease the property to a private business or other
qualified operator, with that party responsible for operating the property as a
short-term rental. Under this structure the lease would be for 80% of the monthly
income minus operational expenses.
Option 2: Long Term Rental
The second option would be to continue using the property as a traditional long-term
residential rental.
This option would provide the City with a relatively stable source of revenue while
generally requiring less ongoing management and operational involvement than a short-
term rental.
Based on preliminary estimates, the property could generate approximately $16,800 in
net annual revenue as a long-term rental.
The primary advantages of this option include:
1. Relatively predictable rental income;
2. Lower turnover and management demands than a short-term rental;
3. Less frequent cleaning and maintenance between occupants;
4. Continued City ownership of the property; and
5. Preservation of the City's ability to reconsider the property's future use at a later
date.
While the projected revenue is substantially lower than the short-term rental option, this
alternative may provide a simpler and more predictable operating arrangement.
Option 3: Sale for Commercial Use
The third option would be to sell the property to a private party for commercial
development or another permitted commercial use.
Selling the property may appear to be the most straightforward option. A sale would
provide the City with a one-time source of revenue, eliminate the City's ongoing
responsibility for the property, and return the property to the private tax roll.
A private commercial use could also potentially contribute to the City's downtown by
bringing a new business, service, or other active use to the property.
Parking and other considerations should be evaluated before determining that a
commercial sale is the preferred option.
1. Parking Considerations:
a. The property is located within the C-1 Commercial District, which
encompasses the City's historic downtown area. Under the City's current
zoning regulations, commercial development in this district does not
require off-street parking
b. This is an important consideration because 256 Front Street is
immediately adjacent to the boat launch and Jacques Park, where public
parking is already limited
c. A commercial use could potentially generate additional customer and
employee parking demand and place additional pressure on public parking
that is currently intended to serve downtown visitors, the boat launch, and
Jacques Park
d. Depending on the type of commercial use ultimately proposed, the City
could therefore be faced with a situation in which the property generates
economic activity but also increases demand for limited public parking
resources
2. Other Considerations:
a. The property's current market value
b. Potential commercial uses that would be appropriate for the location
c. Whether the City should establish conditions or development expectations
as part of a sale
d. Whether selling the property without restrictions could result in a use that
creates parking, traffic, noise, or other concerns
e. The potential annual property tax revenue generated once the property
returns to the tax roll
f. The one-time proceeds from the sale compared with the potential long-
term rental income
g. Whether the City has any future strategic reason to retain control of the
property because of its location along the riverfront.
Potential Use of Revenue
If the short-term rental option is determined to be legally permissible, Council could
consider establishing a special revenue fund dedicated to Downtown and Riverfront
Development.
Under this concept, net revenue generated from the property could be placed into the
special revenue fund and used for eligible maintenance, repairs, improvements,
beautification, or other projects benefiting the City's downtown and riverfront areas.
This would allow the property to generate an ongoing revenue stream while also
directing the financial benefit back toward the areas surrounding the property.
Recommendations
At this time, staff recommends that Council consider the three options and provide
direction regarding which alternatives should be investigated further.
If Council is interested in retaining the property, the next step would be to obtain a legal
opinion regarding the City's ability to operate or lease the property for short-term rental
purposes.
If Council is interested in selling the property, staff could obtain a current property
valuation and further evaluate potential commercial uses and the associated parking
implications.