Posted On: 08/27/2026
FINANCE COMMITTEE MEETING
MONDAY, AUGUST 31, 2026 – 9:00 AM
Sister Bay Liberty Grove Fire Station – 2258 Mill Road
To access the meeting electronically, click:
https://zoom.us/j/4439901723?pwd=yAVpi40M1OIqgNufcVUE8XWCUSkKaH.1&omn=97063638580
Meeting ID: 443 990 1723 Passcode: 304078
To connect by phone: 1-301-715-8592 - Meeting ID 443 990 1723#
Deviations from the agenda order shown may occur
For additional meeting information visit: www.sisterbaywi.gov, click ‘Agendas and Minutes’
AGENDA
1. Call to Order (Zoom Participants Mute Devices)
2. Roll Call
3. Approve Agenda
4. Approve Meeting Minutes:
a) July 13, 2026
b) July 27, 2026
5. Comments, Correspondence and Concerns from the Public (Public comment limited to 3 non-transferable minutes
per person)
6. Discussion/Action Items
a) Sister Bay Historical Society – Request for Village Contribution; Little Sister Barn
b) Hwy 57 Utility Extension Project
c) 2027-2031 Capital Improvement Plan (CIP) Review
d) 2027 Annual Budget Review
7. Staff Updates
8. Matters to be Placed on a Future Agenda or Referred to a Committee, Official or Employee
9. Next Meeting
10. Adjourn
Public Notice
Questions regarding the nature of the Agenda items or more detail on the items listed can be directed to the Village Administrator at
administrator@sisterbaywi.gov. Members of, and possibly a quorum of, other governmental bodies may attend the meeting to
gather information; no action will be taken by any governmental body other than the body specifically referred to above. Upon
reasonable notice, a good faith effort will be made to accommodate the needs of disabled individuals through sign language
interpreters or other auxiliary aid or accommodation at no cost to the individual. Because interpreters are difficult to find, requests
should be made as far in advance as possible, preferably at least 48 hours in advance. For additional information or to request this
service, contact the Sister Bay Village Administration Office at 854-4118; (FAX) 854-9637; or by writing to the Village Administration
Building, 2383 Maple Drive, PO Box 769, Sister Bay, WI 54234. Copies of reports and other supporting documentation are available
for review online.
The Village of Sister Bay is an Equal Opportunity Provider and Employer
1
1
FINANCE COMMITTEE MEETING MINUTES 1
Monday, July 27, 2026, 10 A.M. 2
(Approval Pending) 3
4
1. Call to Order 5
Chairperson Brigid White called t he Finance Committee Meeting to order on Monday July 27, 2026, at 6
10:19 AM at the Sister Bay Liberty Grove Fire Station, 2258 Mill Road, Sister Bay, WI. The late start was 7
due to internet outage at the Fire Station. 8
9
2. Roll Call 10
Present: Chairperson Brigid White, Terry Kelly, Louise Howson, and Mike Laszkiewicz. Andy Woerfel 11
excused. 12
13
Others: Administrator Ben Andrews, Administrative Assistant Sarah Bertges, Financial Specialist/Treasurer 14
Vlad Gannik, John Lijewski, Terry Wolf, Lisa O’Hearn, Patrice Champeau. Zoom: Jennifer Engel, Baird. 15
16
3. Approve Agenda 17
Motion to approve the agenda was made by Howson and seconded by Kelly. Motion carried — all ayes. 18
19
4. Approve Meeting Minutes 20
a.) July 13, 2026; Joint Finance-Village Board Meeting 21
Motion to approve July 13, 2026 regular meeting minutes as presented was made by Kelly and seconded 22
by Laszkiewicz. Motion carried — all ayes. 23
24
b) July 13, 2026; Regular Meeting 25
Motion to approve July 13, 2026 regular meeting minutes as presented was made by Laszkiewicz and 26
seconded by Howson. Motion carried — all ayes. 27
28
5. Discussion/Action Items 29
a. Sister Bay Historical Society – Request for Village Contribution; Little Sister Barn 30
John Lijewski presented the Historical Society's request for a $750,000 Village contribution, to be funded 31
over multiple years, toward the Little Sister Barn project. The Society outlined its $6 million fundraising 32
campaign and stated construction will not begin until 80% of the funds have been secured. Trustee 33
Champeau also requested increasing the Village's annual Historical Society contribution from $15,000 to 34
$30,000 beginning in 2027. 35
36
The committee discussed the project's community and tourism benefits, while also expressing concerns 37
regarding Village financial capacity, competing capital priorities, and the legal authority to contribute 38
public funds to a private nonprofit. Members agreed the request should not be considered for the 2027 39
budget but could remain part of future Capital Improvement Plan (CIP) discussions. 40
Administrator Andrews emphasized that inclusion in the CIP does not constitute funding approval. 41
42
Action Items 43
• Consult the Village Attorney regarding legal authority for contributions to nonprofit. 44
• Keep the request as a standing CIP discussion item. 45
• Request additional information from the Historical Society as needed. 46
47
2
Minutes of the July 27, 2026, Meeting of the Finance Committee - unapproved
2
b. 2027 Capital Improvement Plan (CIP) 1
Jennifer (Baird & Associates) provided a preliminary update on the Village's capital reserve reconciliation. 2
A written report will follow due to technical issues during the presentation. 3
Treasurer Gannik confirmed capital reserve balances reconcile with the general ledger at approximately 4
$6.86 million. The review identified opportunities to better designate reserve accounts and develop a 5
policy for allocating interest earnings. 6
7
The committee agreed that reserve funds should remain dedicated to their intended purposes unless 8
formally reallocated by the Village Board and supported adding quarterly capital project updates as a 9
standing Finance Committee agenda item. 10
11
The committee reviewed the draft 2027 CIP, including: 12
• Maintaining a lower projected levy than 2026. 13
• Deferring waterfront playground improvements to 2028. 14
• Keeping Village Hall engineering in 2028. 15
• Confirming other previously deferred projects. 16
17
Action Items 18
• Receive Baird's written reconciliation report. 19
• Develop a reserve interest allocation policy. 20
• Verify Parks Building Demolition reserves. 21
• Update Highway 57 Trail and Marina restroom cost estimates. 22
• Provide Parks Committee with a road project update. 23
• Add quarterly capital project status reports to future agendas. 24
25
c. 2027 Budget – Preliminary Review 26
Andrews introduced the preliminary 2027 budget and noted updated personnel figures will be 27
incorporated into the next draft. 28
Treasurer Gannik reported that current assessed values would allow approximately $55,000 in additional 29
levy capacity while maintaining the current mill rate. Committee members emphasized that additional 30
capacity should not automatically result in increased spending and reiterated the goal of controlling the 31
tax rate. 32
33
Discussion included: 34
• Reviewing actual prior-year expenditures rather than prior budgets when preparing department 35
budgets. 36
• Monitoring General Government expenditures. 37
• Marina staffing levels and long-term financial sustainability. 38
• Preparing a comprehensive Village debt schedule. 39
40
Final state assessment figures are expected by August 15, with a more complete budget draft to be 41
reviewed on August 31. 42
43
Action Items 44
• Incorporate updated HR budgeting information. 45
• Prepare a comprehensive debt schedule. 46
• Research regional water and wastewater rates. 47
• Department heads to submit revised budgets based on actual expenditures. 48
3
Minutes of the July 27, 2026, Meeting of the Finance Committee - unapproved
3
• Discuss Marina staffing at a future Marina Committee meeting. 1
2
7. Staff Reports/Updates 3
Gannik reported receiving a funding request from the Northern Door Children's Center for consideration 4
during the 2027 budget process. 5
6
Andrews reported that the Village ended 2025 with an approximately $40,000 General Fund surplus, 7
assisted by a TIF transfer and debt service adjustments. 8
9
8. Future Agenda Items 10
• Propane for Village facilities. 11
• Legal review of potential Village contributions to the Historical Society. 12
13
9. Next Meeting 14
The next Finance Committee meeting is scheduled for Monday, August 31, 2026, at 9:00 a.m. 15
16
10. Adjourn 17
A motion to adjourn was at 1:16 p.m. was made by Laszkiewicz and seconded by Howson. The motion 18
carried — all ayes. 19
20
Minutes submitted by Julie Thyssen, Village Clerk 21
4
COMMENTS, CORRESPONDENCE,
AND CONCERNS FROM THE PUBLIC
Date: August 31, 2026
To: Finance Committee
Re: August 2026
Written comments, correspondence, and concerns the month are included in the packet.
5
6
7
Page 1
STAFF REPORT
Date: July 21, 2026
To: Finance Committee
Re: Sister Bay Historical Society – Request for Village Contribution; Little Sister Barn
Author(s): Benjamin Andrews, Village Administrator
The Village of Sister Bay (“Village”) received a request f rom the Sister Bay Historical Society
(SBHS) for contributions for the Little Sister Barn project. This was discussed at the July 27th, 2026,
Finance Committee (“Committee”) meeting. The Committee requested that Village Staff request
a legal opinion from legal counsel to determine the legality of the Village contributing public
funds to a non -Village entity. The legal opinion was included in separate correspondence. This
agenda item was requested to be included as a standing item on the Committee’s agenda. Village
staff has not requested any specific action of the Committee for this agenda item.
Attachments include the SBHS correspondence.
8
9
10
11
12
Page 1
STAFF REPORT
Date: August 31, 2026
To: Finance Committee
Re: 2027-2031 Capital Improvement Plan
Author(s): Benjamin Andrews, Village Administrator
Attached is the most recently updated Cap ital Improvement Plan for the Finance Committee’s
review.
13
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
SUMMARY OF FUNDS
2027 2028 2029 2030 2031 Total
EST. BEGINNING FUND BALANCE 11,080,349$ 14,305,349$ 11,563,588$ 11,677,921$ 11,537,921$
FUNDING SOURCES
CAPITAL PROJECTS LEVY 635,665.21$ 1,376,274.79$ 9,825,833.00$ 708,500.00$ 657,250.00$ 12,546,273.00$
GENERAL FUND LEVY -$ -$ -$ -$ -$ -$
BOND PROCEEDS 5,895,000.00$ -$ -$ -$ -$ 5,895,000.00$
GRANTS 68,808.84$ 1,697,702.16$ 10,025,000.00$ 125,000.00$ -$ 11,916,511.00$
PREMIER RESORT AREA TAX 355,000.00$ -$ -$ -$ -$ 355,000.00$
OTHER SOURCE 2,713,500.00$ 784,500.00$ 3,326,000.00$ 308,000.00$ 255,000.00$ 7,132,000.00$
TOTAL SOURCES 9,667,974.05$ 3,858,476.95$ 23,176,833.00$ 1,141,500.00$ 912,250.00$ 37,844,784.00$
TOTAL AVAILABLE FUNDS 20,748,323.05$ 18,163,825.95 $ 34,740,420.95 $ 12,819,420.95 $ 12,450,170.95 $
USES BY CATEGORY
General Government & Administration 300,000 $ 3,250,000 $ 1,500,000 $ - $ - $ 5,050,000.00$
Fire 15,000.00 $ 110,000.00 $ 159,000.00 $ 449,000.00 $ 59,000.00 $ 792,000.00 $
Parks 283,974.05 $ 2,250,738.00$ 375,000.00 $ 375,000.00 $ 500,000.00 $ 3,784,712.05 $
Public Works Vehicles & Equipment 20,000.00 $ 90,000.00 $ 75,000.00 $ 171,000.00 $ - $ 356,000.00$
Streets 2,100,000.00 $ 100,000.00 $ 100,000.00 $ 100,000.00 $ 100,000.00 $ 2,500,000.00 $
Library 21,000.00 $ 30,000.00 $ 5,000.00 $ 35,000.00 $ 6,000.00 $ 97,000.00 $
Ice Rink - $ - $ - $ - $ 500,000.00$ 500,000.00 $
Water 585,000.00 $ 50,000.00 $ 50,000.00 $ 72,500.00 $ 180,000.00 $ 937,500.00 $
WWTP 12,000.00 $ 10,000.00 $ 20,676,500.00$ 67,000.00 $ 72,000.00 $ 20,837,500.00$
Collection 1,536,000.00 $ 700,000.00 $ 22,000.00 $ 6,000.00 $ - $ 2,264,000.00$
Marina 1,570,000.00 $ 9,500.00 $ - $ - $ - $ 1,579,500.00$
TOTAL USES BY CATEGORY 6,442,974.05$ 6,600,238.00 $ 22,962,500.00 $ 1,275,500.00 $ 1,417,000.00 $ 38,698,212.05 $
EST. ENDING FUND BALANCE 14,305,349.00$ 11,563,587.95 $ 11,777,920.95 $ 11,543,920.95 $ 11,033,170.95 $
2026-2030
8/27/2026
14
CAPITAL IMPROVEMENT PLAN
2024-2028
$-
$5,000,000
$10,000,000
$15,000,000
$20,000,000
$25,000,000
2027 2028 2029 2030
USES BY CATEGORY
VILLAGE OF SISTER BAY
Water
Collection
WWTP
Marina
Library
Ice Rink
Public Works Vehicles & Equipment
Vehicles & Equipment
Fire
Streets
General Government & Administration
15
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
SUMMARY OF FUNDS
2027 2028 2029 2030 2031 Total
EST. BEGINNING FUND BALANCE 3,819,591.00$ 6,844,591.00 $ 3,744,591.00 $ 3,744,591.00 $ 3,744,591.00 $
FUNDING SOURCES
CAPITAL PROJECTS LEVY 75,000.00$ 150,000.00 $ 250,000.00 $ - $ - $ 475,000.00$
GENERAL FUND LEVY -$ - $ - $ - $ - $ - $
BOND PROCEEDS 3,250,000.00$ - $ - $ - $ - $ 3,250,000.00$
GRANTS -$ - $ 1,000,000.00$ - $ - $ 1,000,000.00$
PREMIER RESORT AREA TAX -$ - $ - $ - $ - $ - $
OTHER SOURCE -$ - $ 250,000.00$ - $ - $ 250,000.00$
TOTAL SOURCES 3,325,000.00$ 150,000.00 $ 1,500,000.00$ - $ -$ 4,975,000.00$
TOTAL AVAILABLE FUNDS 7,144,591.00$ 6,994,591.00 $ 5,244,591.00 $ 3,744,591.00 $ 3,744,591.00 $
USES BY CATEGORY
General Government & Administration 300,000.00$ 3,250,000.00$ 1,500,000.00 $ - $ -$ 5,050,000.00$
TOTAL USES BY CATEGORY 300,000.00$ 3,250,000.00$ 1,500,000.00 $ - $ -$ 5,050,000.00$
EST. ENDING FUND BALANCE 6,844,591.00$ 3,744,591.00 $ 3,744,591.00 $ 3,744,591.00 $ 3,744,591.00 $
8/27/2026
16
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
2027 2028 2029 2030 2031 Total
EST. BEGINNING FUND BALANCE 3,819,591$ 6,844,591 $ 3,744,591 $ 3,744,591 $ 3,744,591 $
FUNDING SOURCES
CAPITAL PROJECTS LEVY 75,000$ 150,000 $ 250,000 $ - $ - $ 475,000$
GENERAL FUND LEVY -$ - $ - $ - $ - $ - $
BOND PROCEEDS 3,250,000$ - $ - $ - $ - $ 3,250,000$
GRANTS -$ - $ 1,000,000$ - $ - $ 1,000,000$
PREMIER RESORT AREA TAX -$ - $ - $ - $ - $ - $
OTHER SOURCE -$ - $ 250,000$ - $ - $ 250,000$
TOTAL SOURCES 3,325,000$ 150,000 $ 1,500,000 $ - $ - $ 4,975,000$
TOTAL AVAILABLE FUNDS 7,144,591$ 6,994,591 $ 5,244,591 $ 3,744,591 $ 3,744,591 $
USES BY PROGRAM/PROJECT
Village Administration Building Demo GEN-27-01 75,000 $ 75,000$
Administration Building GEN-27-02 150,000$ 3,100,000 $ - $ - $ - $ 3,250,000$
PW Buildings Demo GEN-27-03 75,000$ -$ -$ -$ -$ 75,000$
Wayfinding & Facilities Signage GEN-28-01 -$ -$ -$ -$ -$ -$
Village Hall Future Engineering-Renovation GEN-29-01 -$ 150,000$ 1,500,000$ -$ -$ 1,650,000$
TOTAL USES BY PROJECT 300,000$ 3,250,000$ 1,500,000$ -$ -$ 5,050,000$
EST. ENDING FUND BALANCE 6,844,591$ 3,744,591$ 3,744,591$ 3,744,591$ 3,744,591$
General Government & Administration
8/27/2026
17
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Village Administration Building Demo 75,000 $ 75,000$
Total 75,000 $ - $ - $ - $ -$ 75,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Capital Projects Levy 75,000 $ 75,000$
Total 75,000 $ - $ - $ - $ -$ 75,000$
Budget Impact/Other
$75,000 is intended to be collected through capital project levy.
4 -Critical Need/Obligated/Within 6-12 Months
Replace Worn Out Equipment
The Village Board took action on the March 24th, 2026, meeting to approve the motion for the demolition and/or removal of the current Village
Administration Building at 2383 Maple Drive.
The current Village Administration building will need to be demolished/removed prior to the construction of the Triangle Reconstruction project.
Village Administration Building Demo Village Administrator
GEN-27-01 Facilities
40 Years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
General Government General Government
18
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Administration Building 150,000$ 3,100,000$ - $ - $ - $ 3,250,000$
Total 150,000$ 3,100,000$ - $ - $ - $ 3,250,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Bond Proceeds 3,250,000 $ - $ - $ - $ 3,250,000$
Grants - $ - $ - $ - $ - $ -$
Total 3,250,000$ - $ - $ - $ - $ 3,250,000$
Budget Impact/Other
In late 2024, extensive time was spent explaining how the building would be paid for, so that trustees and the public understood how the project would be financed and its
impact on taxpayers. Including the Admin Building debt, the village would not have to increase its existing debt levy. The project is to be funded through general obligation
bonds and long-term financing.
The estimated cost for design thru bidding services for the new Village Administration Building is $150,000. Additional costs for the construction of the building will be
provided as an estimate of probable cost during the design process. Construction management service costs are to be identified.
4 -Critical Need/Obligated/Within 6-12 Months
Replace Worn Out Equipment
New Administration Building with trustee chambers, executive session conference room, elections space/secure elections space required by law, employee office space, flex
workspace for consultants/dept heads/others, client conference room, file space/archive space, restrooms, employee kitchen/lounge, lobby, drop box, payment window.
Includes sound system for meetings and presentations, handicapped accessible, good exterior lighting, safety features to separa te employees from public, and secure doors.
Administration Building Erik Linczmaier
GEN-27-02 Facilities
40 years
The current administration building is too small for the needs. The current building has issues with heating/cooling, leaks, electrical overloads, insects, and needs new
windows, etc. The current building lacks privacy for voting or conversations. It lacks meeting spaces, large and small. We do not have good storage space that is safe from
fire, water damage, or rodents. Logistically, being separated from other staff is inefficient. The voting equipment should be stored onsite in a secure closet/space.
VILLAGE OF SISTER BA
Y
CAPITAL IMPROVEMENT PLAN
2027-2031
General Government General Government
8/27/2026
19
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
PW Buildings Demo 75,000$ - $ - $ - $ - $ 75,000$
Total 75,000$ - $ - $ - $ - $ 75,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Capital Projects Levy -$ -$ -$ -$ -$
Total -$ -$ -$ -$ -$ -$
Budget Impact/Other
$75,000 was collected in 2025, but restricted by the Board. Demolition to occur in 2027 and there is no impact to the 2027 budget.
5 -Mandated/Mission Driven/Immediate Need
Replace Worn Out Equipment
On December 16th, 2025, the Village Board approved a motion to select the former site of the Public Works Building (2313 Mill Road) as the site of the new Village Administration Building. In
order for the building to be constructed, the current building will need to be demolished.
The building has exceeded its useful life and is in disrepair. Removing the building eliminates a potential safety threat, improves the aesthetics of the village, and preares the site for the next
land use.
PW Buildings Demo Erik Linczmaier
GEN-27-03 Facilities
40 years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
General Government General Government
8/27/2026
20
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Wayfinding & Facilities Signage -$ - $ - $ - $ - $ -$
Total -$ - $ - $ - $ - $ - $
Funding Sources 2027 2028 2029 2030 2031 Total
Capital Projects Levy -$ -$ -$ -$ -$ -$
Total -$ -$ -$ -$ -$ -$
Budget Impact/Other
N/A
Signage
Originally $250,000 was placed in the CIP, and annually it tended to be pushed further to the future. In spring 2025 the Finance Committee decided not to pursue the project at that time,
but leave the item in the CIP workbook in case updated bids are received someday and the Village board decides to pursue the project. To be reviewed annually.
3 -Preventive Need/Public Benefit/1-2 Years
New Program/Service
The village had completed a wayfinding signage study and had intended to redesign and replace Village wayfinding and facilities signage. The goal was to assist the public in finding
amenities and facilities, and create a cohesive look for all Village properties and facilities.
Help residents and visitors find their way around Sister Bay easily. Market Sister Bay. Update look of Village.
5-10 years
Wayfinding & Facilities Signage
GEN-28-01
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
General GovernmentGeneral Government
8/27/2026
21
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Village Hall Future Engineering 150,000$ - $ - $ - $ 150,000$
Village Hall Future Renovation -$ - $ 1,500,000$ - $ - $ 1,500,000$
Total -$ 150,000$ 1,500,000 $ - $ - $ 1,650,000$
.
Funding Sources 2027 2028 2029 2030 2031 Total
Capital Projects Levy -$ 150,000$ 250,000 $ - $ - $ 400,000$
Other Source - $ - $ 250,000$ - $ - $ 250,000$
Grants - $ - $ 1,000,000$ - $ - $ 1,000,000$
Total -$ - $ 1,500,000$ - $ - $ 1,500,000$
Budget Impact/Other
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
General Government
Village Hall Future Engineering-Renovation
General Government
GEN-29-01
Total project costs are estimated to be $2,500,000. If CDBG-PF funding is applied, the total obligation of the Village would be $1,500,000.
2 -Improvement Benefit/Desired Want/2-3 Years
Current Equipment Obsolete
The Village Hall is in need of rennovation and addition; 2025 architectural drawings.
The Village Hall project has been identified as a need by the Village Hall Planning Task Force.
Eric Linczmaier
Facilities
0 years
8/27/2026
22
PROGRAM/ 2027 2027 2027
CATEGORY PROGRAM/PROJECT PROJECT # PRIORITY PURPOSE Requested Defunded A pproved
General Government Village Administration Building Demo GEN-27-01 4 -Critical Need/Obligated/Within 6-12 Months Replace Worn Out Equipment 75,000$
General Government Administration Building GEN-27-02 4 -Critical Need/Obligated/Within 6-12 Months Replace Worn Out Equipment 3,250,000$
General Government PW Buildings Demo GEN-27-03 5 -Mandated/Mission Driven/Immediate Need Re place Worn Out Equipment -$
General Government Wayfinding & Facilities Signage GEN-28-01 3 -Preventive Need/Public Benefit/1-2 Years New Pro gram/Service -$
General Government Village Hall Future Engineering-Renovation GEN-29-01 2 -Improvement Benefit/Desired Want/2-3 Years Current E quipment Obsolete -$
Budget Funding Totals 3,325,000$ - $ - $
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027 RECOMMENDED BUDGET
CAPITAL EXPENDITURE
23
YEAR RANKING Estimated
CATEGORY PLANNED CRITERIA PURPOSE Cost
N/A
Budget Funding Totals -$
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
CAPITAL EXPENDITURE PLANNING
BEYOND 5-YEAR PERIOD
PROGRAM/PROJECT
24
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
SUMMARY OF FUNDS
2027 2028 2029 2030 2031 Total
EST. BEGINNING FUND BALANCE 811,809$ 911,809 $ 1,156,059$ 1,170,392 $ 836,392 $
FUNDING SOURCES
CAPITAL PROJECTS LEVY 115,000$ 354,250 $ 173,333 $ 115,000 $ 254,250 $ 1,011,833$
GENERAL FUND LEVY -$ - $ - $ - $ - $ - $
BOND PROCEEDS -$ - $ - $ - $ - $ - $
GRANTS -$ - $ - $ - $ - $ - $
PREMIER RESORT AREA TAX -$ - $ - $ - $ - $ - $
OTHER SOURCE -$ - $ - $ - $ - $ - $
TOTAL SOURCES 115,000$ 354,250$ 173,333$ 115,000$ 254,250$ 1,011,833$
TOTAL AVAILABLE FUNDS 926,809$ 1,266,059$ 1,329,392 $ 1,285,392 $ 1,090,642 $
USES BY CATEGORY
FIRE 15,000$ 110,000$ 159,000$ 449,000$ 59,000$ 792,000$
TOTAL USES BY CATEGORY 15,000$ 110,000$ 159,000$ 449,000$ 59,000$ 792,000$
EST. ENDING FUND BALANCE 911,809$ 1,156,059$ 1,170,392 $ 836,392 $ 1,031,642$
8/27/2026
25
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
2027 2028 2029 2030 2031 Total
EST. BEGINNING FUND BALANCE 811,809$ 796,809$ 845,309$ 859,809$ 534,309$
FUNDING SOURCES
CAPITAL PROJECTS LEVY 158,500$ 173,500$ 123,500$ 59,000$ 514,500$
GENERAL FUND LEVY -$ -$ -$ -$ -$ -$
BOND PROCEEDS -$ -$ -$ -$ -$ -$
GRANTS -$ -$ -$ -$ -$ -$
PREMIER RESORT AREA TAX -$ -$ -$ -$ -$ -$
OTHER SOURCE -$ -$ -$ -$ -$ -$
TOTAL SOURCES -$ 158,500$ 173,500$ 123,500$ 59,000$ 514,500$
TOTAL AVAILABLE FUNDS 811,809$ 955,309 $ 1,018,809$ 983,309 $ 593,309 $
USES BY PROGRAM/PROJECT PROGRAM/PROJECT #
FD Maintanance FIRE-27-01 15,000 $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 75,000 $
Fire Station Flooring Replacement FIRE-27-02 - $ 95,000$ - $ - $ - $ 95,000$
SCBA Air Packs and Spare Bottles FIRE-28-01 - $ - $ 94,000$ - $ - $ 94,000$
Turn Out Gear FIRE-29-02 - $ - $ 50,000$ - $ - $ 50,000$
Engine 6 FIRE-30-01 - $ - $ - $ 434,000$ - $ 434,000$
Defibrillators FIRE-31-01 - $ - $ - $ - $ 44,000$ 44,000 $
TOTAL USES BY PROJECT 15,000$ 110,000 $ 159,000 $ 449,000 $ 59,000 $ 792,000 $
EST. ENDING FUND BALANCE 796,809$ 845,309 $ 859,809 $ 534,309 $ 534,309 $
FIRE
8/27/2026
26
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
FD Maintanance 15,000$ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 75,000$
Total 15,000$ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 75,000 $
Funding Sources 2027 2028 2029 2030 2031 Total
Capital Projects Levy 15,000$ 15,000$ 15,000$ 15,000$ 15,000$ 75,000$
Total 15,000$ 15,000$ 15,000$ 15,000$ 15,000$ 75,000$
Budget Impact/Other
15 years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
Fire Department Fire Department
FD Maintanance Fire Chief
FIRE-27-01 FIRE Department
5 -Mandated/Mission Driven/Immediate Need
Replace Worn Out Equipment
FD Maintanance
8/27/2026
27
Category: Department:
Program/Project Name: Contact: 1 -Maintain/Public Want/Greater than 3 Years
Program/Project #: Type: 2 -Improvement Benefit/Desired Want/2-3 Years
Useful Life: 3 -Preventive Need/Public Benefit/1-2 Years
Note: Program/Project Name and # Referenced on Category Sheet. Priority: 4 -Critical Need/Obligated/Within 6-12 Months
Purpose: 5 -Mandated/Mission Driven/Immediate Need
Description
Scheduled Replacement
Current Equipment Obsolete
Replace Worn Out Equipment
New Program/Service
Expanded Service
Increase Safety
Improve Policies/Procedures
Justification Reduce Personnel Time
Capital Projects Levy
General Fund Levy
Bond Proceeds
Grants
Premier Resort Area Tax
Ex
penditures (Uses) 2026 2027 2028 2029 2030 2031 Total Other Source
Fire Station Flooring Replacement 95,000$ 95,000$
Total -$ 95,000$ - $ - $ - $ - $ 95,000$
Funding Sources 2026 2027 2028 2029 2030 2031 Total
Capital Projects Levy 60,000$ 35,000 $ 35,000$
Total 60,000$ 35,000 $ - $ - $ - $ - $ 35,000$
Budget Impact/Other
Financial Impact to budget of $35,000 in 2027; $60,000 was levied in 2026 for capital projects levy.
4 -Critical Need/Obligated/Within 6-12 Months
Replace Worn Out Equipment
Replace the flooring inside the Fire Station Garage. PURPOSE
Flooring is currently in need of replacement at the Fire Station.
FUNDING SOURCES
PRIORITY
Fire Station Flooring Replacement Fire Chief
FIRE-27-02 FIRE Department
15 years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
Fire Department Fire Department
28
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Note: Program/Project Name and # Referenced on Category Sheet. Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2026 2027 2028 2029 2030 2031 Total
SCBA Air Packs and Spare Bottles -$ - $ 94,000$ - $ - $ 94,000$
Total -$ - $ 94,000$ - $ - $ - $ 94,000$
Funding Sources 2026 2027 2028 2029 2030 2031 Total
Capital Projects Levy 24,000$ 35,000$ 35,000$ -$ -$ 94,000$
Total 24,000$ 35,000$ 35,000$ -$ -$ -$ 70,000$
Budget Impact/Other
Funding
SCBA Air Packs and Spare Bottles
FIRE-28-01
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
Fire DepartmentFire Department
Fire Chief
FIRE Department
3 -Preventive Need/Public Benefit/1-2 Years
Replace Worn Out Equipment
15 years
Federal Emergency Management Agency (FEMA) - Assistance to Firefighters (AFG) Grant: FEMA's AFG grant is a funding opportunity for critical firefighter and first responder equipment, protective gear,
training, and emergency vehicles. The likihood of award is low; however, the proposed project is considered for an application through the funding program. Applications occur at various times, so it is
SCBA air packs and spare bottles - The useful life of these assets is 15 years. The current inventory is from 1982 to 2004. Pricing is expected to be at least double that.
The Department's current (5/2011) SCBA inventory ranges in age from 1982 to 2004 and span at least four different sets of NFPA requirements. None of the in-service inventory meets the current
standards. The NFPA and COMM 30 require each member of the Fire Deaprtment to have an air pack available to them while working in a hazardous atmosphere. The CIP plan for the replacement of the air
packs would allow for a department-wide standardization of this equipment and would allow all air packs to be compliant with the standards at that time. The CIP currently plans for only a single
replacement of these items, but it would be expected that as the CIP continues to be adjusted that the future replacement of air packs would be added at some time (15+ years). The issue will be the
hydrotest dates will run out and then they can't be tested anymore.
Financial Impact to budget of $24,000 from 2026-2028, and $48,000 in 2029 annually for reserve in capital fund.
8/27/2026
29
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Note: Program/Project Name and # Referenced on Category Sheet. Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Turn Out Gear -$ - $ 50,000$ - $ - $ 50,000$
Total -$ - $ 50,000$ - $ - $ 50,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Capital Projects Levy -$ -$ 50,000$ -$ -$ 50,000$
Total -$ -$ 50,000$ -$ -$ 50,000$
Budget Impact/Other
Financial Impact to budget of $50,000 to be covered by capital project levy.
3 -Preventive Need/Public Benefit/1-2 Years
Replace Worn Out Equipment
Replacement of Turn Out Gear.
Scheduled Replacement of Turn Out Gear.
Turn Out Gear Fire Chief
FIRE-29-02 FIRE Department
15 years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
Fire Department FIRE Department
8/27/2026
30
Category:D epartment:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Note: Program/Project Name and # Referenced on Category Sheet. Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Engine 6 -$ - $ - $ $434,000 - $ 434,000$
-$ - $ - $ 434,000$ - $ 434,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Capital Projects Levy 108,500$ 108,500 $ 108,500 $ 108,500 $ - $ 434,000$
108,500$ 108,500 $ 108,500 $ 108,500 $ - $ 434,000$
Budget Impact/Other
Fire Department
Engine 6
FIRE-30-01
Financial Impact to budget includes $108,500 annually for reserve in capital fund. Actual impact to expenditures of $1,300,000 for the Village's portion of cost in capital fund.
5 -Mandated/Mission Driven/Immediate Need
Replace Worn Out Equipment
Engine 6
Chris Hecht
FIRE Department
15 years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
FIRE Department
8/27/2026
31
Category:D epartment:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Note: Program/Project Name and # Referenced on Category Sheet. Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Defibrillators -$ -$ -$ 44,000$ 44,000$
-$ -$ -$ -$ 44,000$ 44,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Capital Projects Levy -$ - $ - $ - $ 44,000$ 44,000$
-$ - $ - $ - $ 44,000$ 44,000 $
Budget Impact/Other
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
PROJECT OR PROGRAM / DESCRIPTION & JUSTIFICATION
Fire Department FIRE Department
Defibrillators Chris Hecht
FIRE-31-01 FIRE Department
15 years
1 -Maintain/Public Want/Greater than 3 Years
Replace Worn Out Equipment
Defibrillators
8/27/2026
32
PROGRAM/ 2027 2027 2027
CATEGORY PROGRAM/PROJECT PROJECT # PRIORITY PURPOSE Requested Defunded Approved
FIRE FD Maintanance FIRE-27-01 5 -Mandated/Mission Driven/Immediate Need Replace Worn Out Equipment 15,000 $
FIRE Fire Station Flooring Replacement FIRE-27-02 4 -Critical Need/Obligated/Within 6-12 Months Replace Worn Out Equipment 35,000 $
FIRE SCBA Air Packs and Spare Bottles FIRE-28-01 3 -Preventive Need/Public Benefit/1-2 Years Replace Worn Out Equipment 35,000 $
FIRE Turn Out Gear FIRE-29-02 3 -Preventive Need/Public Benefit/1-2 Years Replace Worn Out Equipment - $
FIRE Engine 6 FIRE-30-01 5 -Mandated/Mission Driven/Immediate Need Replace Worn Out Equipment 108,500$
FIRE Defibrillators FIRE-31-01 1 -Maintain/Public Want/Greater than 3 Years Replace Worn Out Equipment - $
Budget Funding Totals 193,500$ - $ - $
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027 RECOMMENDED BUDGET
CAPITAL EXPENDITURE
33
YEAR RANKING Estimated
CATEGORY PLANNED CRITERIA PURPOSE Cost
Fire Brush 19 2033 4 - Future Scheduled Replacement 116,667$
Fire Porta-count 2033 4 - Future Scheduled Replacement 4,833 $
Fire Gear Washer South 2035 4 - Future Scheduled Replacement 2,667 $
Fire Tower 22 2036 4 - Future Scheduled Replacement 533,333$
Fire S-54 2038 4 - Future Scheduled Replacement 28,333 $
Fire Turn Out Gear 2039 4 - Future Scheduled Replacement 58,333 $
Fire Hose 25 2040 4 - Future Scheduled Replacement 266,667$
Fire SCBA Airpacks 2043 4 - Future Scheduled Replacement 60,000 $
Fire Tanker 6-12 2044 4 - Future Scheduled Replacement 225,000$
Fire Brush 6-20 2048 4 - Future Scheduled Replacement 91,667 $
Fire Porta-count 2049 4 - Future Scheduled Replacement 4,833 $
Fire Rescue 6-24 2050 4 - Future Scheduled Replacement 400,000$
Fire Turn Out Gear 2050 4 - Future Scheduled Replacement 58,333 $
Budget Funding Totals 1,850,667$
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
CAPITAL EXPENDITURE PLANNING
BEYOND 5-YEAR PERIOD
PROGRAM/PROJECT
34
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
SUMMARY OF FUNDS
2027 2028 2029 2030 2031 Total
EST. BEGINNING FUND BALANCE 505,000.00$ 505,000.00$ 518,988.95$ 618,988.95$ 718,988.95$
FUNDING SOURCES
CAPITAL PROJECTS LEVY 215,165.21$ 567,024.79 $ 225,000.00 $ 225,000.00 $ 200,000.00 $ 1,432,190.00 $
GENERAL FUND LEVY -$ - $ - $ - $ - $ - $
BOND PROCEEDS -$ - $ - $ - $ - $ - $
GRANTS 68,808.84$ 1,697,702.16$ 125,000.00 $ 125,000.00$ -$ 2,016,511.00$
PREMIER RESORT AREA TAX -$ - $ - $ - $ - $ - $
OTHER SOURCE -$ - $ 125,000.00$ 125,000.00 $ - $ 250,000.00$
TOTAL SOURCES 283,974.05$ 2,264,726.95$ 475,000.00 $ 475,000.00$ 200,000.00$ 3,698,701.00$
TOTAL AVAILABLE FUNDS 788,974.05$ 2,769,726.95 $ 993,988.95 $ 1,093,988.95 $ 918,988.95 $
USES BY CATEGORY
Parks 283,974.05$ 2,250,738.00$ 375,000.00 $ 375,000.00$ 500,000.00$ 3,784,712.05$
TOTAL USES BY CATEGORY 283,974.05$ 2,250,738.00$ 375,000.00$ 375,000.00$ 500,000.00$ 3,784,712.05$
EST. ENDING FUND BALANCE 505,000.00$ 518,988.95 $ 618,988.95 $ 718,988.95 $ 418,988.95 $
8/27/2026
35
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
2027 2028 2029 2030 2031 Total
EST. BEGINNING FUND BALANCE 505,000$ 505,000$ 518,989$ 618,989$ 718,989$
FUNDING SOURCES
CAPITAL PROJECTS LEVY 215,165$ 567,025$ 225,000$ 400,000$ 200,000$ 1,607,190$
GENERAL FUND LEVY -$ -$ -$ -$ -$ -$
BOND PROCEEDS -$ -$ -$ -$ -$ -$
GRANTS 68,809$ 1,697,702$ 125,000 $ -$ -$ 1,891,511$
PREMIER RESORT AREA TAX -$ -$ -$ -$ -$ -$
OTHER SOURCE -$ -$ 125,000$ -$ -$ 125,000$
TOTAL SOURCES 283,974$ 2,264,727$ 475,000 $ 400,000$ 200,000$ 3,623,701$
TOTAL AVAILABLE FUNDS 788,974$ 2,769,727 $ 993,989 $ 1,018,989 $ 918,989 $
USES BY PROGRAM/PROJECT PROGRAM/PROECT #
HWY 57 Trail PARKS-28-01 86,011 $ 1,145,587$ - $ - $ - $ 1,231,598$
Village Hall Painting PARKS-27-01 25,000 $ - $ - $ - $ - $ 25,000$
Post Office Painting PARKS-27-02 18,000 $ - $ - $ - $ - $ 18,000$
Logerquist Re-Roofing PARKS-27-03 10,000 $ - $ -$ -$ -$ 10,000$
Hwy 42 Trail to Ephraim PARKS-28-02 144,963$ 1,075,151$ - $ -$ -$ 1,220,114$
Waterfront Playground Equipment PARKS-28-03 -$ -$ -$ -$ 450,000$ 450,000$
Dog Park Renovations PARKS-29-01 -$ -$ 125,000$ -$ -$ 125,000$
Pebble Beach Parking, Restrooms, Overlook PARKS-29-02 -$ 30,000$ 250,000$ -$ -$ 280,000$
Hwy 57 Trail - Phase II Expansion PARKS-30-01 -$ -$ -$ 250,000$ -$ 250,000$
Misc. Trails PARKS-31-01 -$ -$ -$ 50,000$ 50,000$ 100,000$
TOTAL USES BY PROJECT 283,974$ 2,250,738$ 375,000 $ 300,000$ 500,000$ 3,709,712$
EST. ENDING FUND BALANCE 505,000$ 518,989 $ 618,989 $ 718,989 $ 418,989 $
Parks
8/27/2026
36
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Note: Program/Project Name and # Referenced on Category Sheet. Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Village Hall Painting 25,000 $ 25,000$
Total 25,000 $ - $ - $ - $ -$ 25,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Capital Projects Levy 25,000 $ 25,000$
Total 25,000 $ - $ - $ - $ -$ 25,000$
Budget Impact/Other
10 years
Village Hall Painting Parks and Streets Director
PARKS-27-01 Buildings
Apply $25,000 to the capital project levy in 2027.
5 -Mandated/Mission Driven/Immediate Need
Replace Worn Out Equipment
Village Hall soffit and fascia needs to be repainted.
To preserve and protect infastructure from the elements.
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2023-2027
PROJECT OR PROGRAM / DESCRIPTION & JUSTICATION
Parks Parks
37
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Note: Program/Project Name and # Referenced on Category Sheet. Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Post Office Painting $18,000 18,000$
Total 18,000 $ - $ - $ - $ -$ 18,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Capital Projects Levy 18,000 $ 18,000$
Total 18,000 $ - $ - $ - $ -$ 18,000$
Budget Impact/Other
10 years
Post Office Painting Parks and Streets Director
PARKS-27-02 Buildings
Apply $18,000 to the capital project levy in 2027.
5 -Mandated/Mission Driven/Immediate Need
Replace Worn Out Equipment
Post Office soffit,fascia and cinder block walls need to be repainted.
To preserve and protect infastructure from the elements.
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2023-2027
PROJECT OR PROGRAM / DESCRIPTION & JUSTICATION
Parks Parks
38
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Logerquist Re-Roofing 10,000$ $10,000
Total 10,000$ - $ - $ - $ -$ 10,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Capital Projects Levy 10,000$ 10,000$
Total 10,000$ - $ - $ - $ -$ 10,000$
Budget Impact/Other
Apply $10,000 to the capital project levy in 2027.
3 -Preventive Need/Public Benefit/1-2 Years
Replace Worn Out Equipment
Re-roof four (4) of the small white structures on the Logerquist site.
To preserve and protect infrastructure from the elements.
Logerquist Re-Roofing Parks and Streets Director
PARKS-27-03 Buildings
30 years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2023-2027
PROJECT OR PROGRAM / DESCRIPTION & JUSTICATION
Parks Parks
39
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Note: Program/Project Name and # Referenced on Category Sheet. Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
HWY 57 Trail 86,011$ 1,145,587$ - $ -$ -$ 1,231,598$
Total 86,011$ 1,145,587$ - $ -$ -$ 1,231,598$
Funding Sources 2027 2028 2029 2030 2031 Total
Capital Projects Levy 17,202$ 221,995 $ - $ - $ - $ 239,197$
Grants 68,809 $ 837,581 $ - $ - $ - $ 906,390$
Total 86,011$ 1,059,576$ - $ - $ - $ 1,145,587$
Budget Impact/Other
20 years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
PROJECT OR PROGRAM / DESCRIPTION & JUSTIFICATION
Parks Parks
HWY 57 Trail Parks and Streets Director
PARKS-28-01 Trail
Planning was completed in 2024 and paid for with a donation. The engineering contract was awarded in 2025 and is expected to be 60% complete by the end of 2025.
The engineering contract was for $68,000, but additional costs will be incurred if soil borings or right-of-way acquisitions are necessary. The village is responsible for the engineering, and it is not
covered by the grant.
Construction management/bid release to occur in 2027. Construction management estimated at $85,000 plus legal services (deed work, etc.) so $95,000 in total estimated. Construction to start
M
ay 2027, unless DOT approves a Fall 2026 start, with project expected to be complete by the end of September 2027.
4 -Critical Need/Obligated/Within 6-12 Months
New Program/Service
Pedestrian/ Bike Path along Highway 57 from Hwy 42/Gateway Park to eventually Northwoods Drive. Path off-road to facilitate bikes and pedestrians who are currently walking along the highway
in that area. Asphalt path. Cooperative with DOT. Funding will also be needed to continue the trail from Northwoods Drive to the Village limits/Corner of the Past in the future
People are frequently walking and biking on the shoulder of the highway which is a safety issue. As we see more homes and businesses in that area, the problem will continue to worsen.
8/27/2026
40
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Note: Program/Project Name and # Referenced on Category Sheet. Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Hwy 42 Trail to Ephraim 144,963$ 1,075,151$ - $ - $ - $ 1,220,114$
Total 144,963$ 1,075,151$ - $ - $ - $ 1,220,114$
Funding Sources 2027 2028 2029 2030 2031 Total
Capital Projects Levy 144,963$ 215,030 $ - $ - $ - $ 359,993$
Grants - $ 860,121$ - $ - $ - $ 860,121$
Total 144,963$ 1,075,151$ - $ - $ - $ 1,220,114$
Budget Impact/Other
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
PROJECT OR PROGRAM / DESCRIPTION & JUSTIFICATION
ParksParks
Parks and Streets Director
Trail
Financial impact to budget - DOT TAP Grant to be applied for. $144,963 to be engineering cost paid for with Capital Project Levy. Project increases by 4% annually, per DOT guidelines. Estimates
based on 2024 figures.
3 -Preventive Need/Public Benefit/1-2 Years
New Program/Service
Pedestrian/ Bike Path that will connect the existing bike path on HWY 42 up the hill into Ephraim. Designed in 2024, engineered in 2025, construction in 2028.
People are frequently walking and biking on the shoulder of the highway which is a safety issue. This will extend the HWY 42 trail and hopefully extend into Ephraim. This would be a multi
jurisdictional trail that would connect Sister Bay, Ephraim, Fish Creek and Egg Harbor.
20 years
Hwy 42 Trail to Ephraim
PARKS-28-02
8/27/2026
41
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Note: Program/Project Name and # Referenced on Category Sheet. Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Waterfront Playground Equipment -$ - $ -$ -$ 450,000$ 450,000$
Total -$ - $ -$ -$ 450,000$ 450,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Capital Projects Levy 100,000$ 100,000 $ 100,000 $ 150,000 $ 450,000$
Total -$ 100,000$ 100,000 $ 100,000$ 150,000$ 450,000$
Budget Impact/Other
The committee estimated the financial impact to the to be $450,000. However, monies should be sought for design services to ensure the equipment meets users needs and is accessible. Many equipment
providers offer grants to help municipalities, and they should be pursued when the village is ready to move forward with the project. Apply $100,000 to the capital project levy 2028 thru 2031.
2 -Improvement Benefit/Desired Want/2-3 Years
Replace Worn Out Equipment
Inclusive Playground - rubberized base, new equipment. Playground creates a space where all children, regardless of mobility, can play and socialize. Would be placed where existing Waterfront Park
playground is located. Equipment could be branded for Sister Bay (ships, scandinavian, vikings, goats, etc) but branded equipment is additional cost.
Current equipment is aged and in need of replacement; it is not accessible to all children. Replace with playground accessible by all mobility levels.
Parks and Streets Director
Parks
Parks
Waterfront Playground Equipment
PARKS-28-03
15 years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
PROJECT OR PROGRAM / DESCRIPTION & JUSTIFICATION
Parks
8/27/2026
42
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Note: Program/Project Name and # Referenced on Category Sheet. Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Dog Park Renovations -$ - $ 125,000$ - $ - $ 125,000$
Total -$ - $ 125,000$ - $ - $ 125,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Other Source -$ -$ 125,000$ -$ -$ 125,000$
Total -$ -$ 125,000$ -$ -$ 125,000$
Budget Impact/Other
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
PROJECT OR PROGRAM / DESCRIPTION & JUSTIFICATION
ParksParks
Parks and Streets Director
Parks
Existing reserves from Valerie Davis Estate - $43,011. Reserved dog park donations - $6,989. $25,000 for engineering in 2026 used from these reserves. $100,000 construction cost is an
estimate only. Could be funded by donations or Municipal Reimbursement Funds, if approved.
2 -Improvement Benefit/Desired Want/2-3 Years
Expanded Service
Public has requested that large dogs be separated from small dogs. Facility study indicated that dog park should be relocated. The PPS Committee has discussed a dog park on the Logerquist
site. The CORP recommends a new dog park, or dogs be separated.
Use funds from the Valerie Davis Estate which were received in 2019. Ms. Davis was a supporter of various humane societies.
20 years
Dog Park Renovations
PARKS-29-01
8/27/2026
43
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Note: Program/Project Name and # Referenced on Category Sheet. Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Pebble Beach Parking, Restrooms, Overlook -$ 30,000$ 250,000 $ - $ - $ 280,000$
Total -$ 30,000$ 250,000 $ - $ - $ 280,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Capital Projects Levy -$ 30,000$ 125,000 $ - $ - $ 155,000$
Grants - $ - $ 125,000$ - $ - $ 125,000$
Capital Projects Levy -$ - $ - $ - $ -$
Total -$ 30,000$ 250,000 $ - $ - $ 280,000$
Budget Impact/Other
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
PROJECT OR PROGRAM / DESCRIPTION & JUSTIFICATION
ParksParks
Parks and Streets Director
Parks
Phase I: Engineering and construction of the boardwalk and overlook - $30,000 for engineering was moved back to 2028; $250,000 set aside for construction in 2029. Grant eligible.
Phase II: Parking lot and bio swale engineering; construct bio-swale; hard surface lot. Not included in 5 year plan at this time. Bio-swale is grant eligible.
Phase III: Toilet and waste management. Not included in 5 year plan at this time.
3 -Preventive Need/Public Benefit/1-2 Years
New Program/Service
Previous PPS Committee discussed installing ‘boulder benches’, a bike rack, trash receptacle, hard surfacing the north parking lot to prevent degradation of the park and runoff damage,
restrooms, and a boardwalk with overlook. At that time research was done on asphalt costs, bio-swale engineering, and grant research. The committee also wanted a pit toilet, and an
accessible boardwalk with beach overlook. Preliminary designs were pursued, cost estimates obtained, and conversations with the Land Trust and grantors were pursued. The committee
membership then changed, and the project was cancelled, but in early 2025 it was briefly discussed again.
Creating a wheelchair accessible boardwalk with a beach overlook was a commitment the village previously made with a gentleman who agreed to donate to the acquisition of the park, provided
the village installed a wheelchair accessible boardwalk. To install a wheelchair accessible boardwalk, you need a hard surface parking lot. To install a hard surface, you need to address
drainage, which requires a bio-swale. All these amenities require engineering. Although a pit toilet, or any toilet, can be foregone, the park has grown in popularity (now being advertised by
the state and land trust on social media) and eventually the village should address how human waste will be managed.
15 years
Pebble Beach Parking, Restrooms, Overlook
PARKS-29-02
8/27/2026
44
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Priority:
Purpose:
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Hwy 57 Trail - Phase II Expansion -$ - $ 250,000$ 250,000$
Total -$ - $ - $ 250,000$ - $ 250,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Capital Projects Levy -$ - $ - $ 250,000$ 250,000$
Grants - $ - $ - $ - $ -$
Total -$ - $ - $ 250,000$ - $ 250,000$
Budget Impact/Other
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
Parks
Parks and Streets Director
Trail
20
years
Parks
Hw
y 57 Trail - Phase II Expansion
PARKS-30-01
2 -Improvement Benefit/Desired Want/2-3 Years
New Program/Service
Financial impact to budget - capital levy of $250,000 in 2030. Cost estimate and additional project management would be require d.
The trail expansion project would extend multi-use trail access through the Hwy 57 corridor to the edge of the
southernmost village limits. Benefits would be include improved safety and additional pedestrian/cylist access.
Expansion of the Hwy 57 Trail Project; Connecting trail from Northwoods Drive, through Fieldcrest, to Hwy 57.
Description
Justification
8/27/2026
45
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Note: Program/Project Name and # Referenced on Category Sheet. Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Misc. Trails -$ -$ 50,000$ 50,000$ 100,000$
Total -$ -$ -$ 50,000$ 50,000$ 100,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Capital Projects Levy -$ - $ - $ 50,000$ 50,000 $ 100,000$
Grants - $ - $ - $ - $ -$
Total -$ - $ - $ 50,000$ 50,000 $ 100,000 $
Budget Impact/Other
20 years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
PROJECT OR PROGRAM / DESCRIPTION & JUSTIFICATION
Parks Parks
Misc. Trails Erik Linczmaier
PARKS-31-01 Trail
Financial impact to budget - capital levy of $50,000 in 2030. Grant eligible.
3 -Preventive Need/Public Benefit/1-2 Years
New Program/Service
Recreational planning efforts, and downtown redevelopment plans, all discussed a trail through the wetland behind the fire station, to connect to the gravel path between the fire station
property’s stormwater pond and Woodcrest Road. This trail would help eliminate congestion, allow pedestrian access to more areas, and meet nature recreation goals in the CORP. In 2023
there were early design efforts and a wetland determination inspection, with a boardwalk plan developed in 2023 by Stantec. The project was then delayed for budgetary purposes.
During the 2025 budget process, the village decided to start budgeting annually for trails. It is anticipated this money will be used for the preliminary work needed to eventually pursue grants
to help offset costs.
The Woodland Trail project needs a wetland determination, engineering, and a wetland permit before the project can even be put to bid and built. Wetland determinations expire, and DNR
permits take a long time to obtain (sometimes a year), so the village needs to plan ahead. This is a grant eligible project, but initial work must be done to qualify and to know estimated project
costs. This initial work is projected to cost $100,000, dependent on consultants and the engineering firm selected. Construction for the Woodland Trail alone was previously estimated at
$905,000. Budgeting annually ensures proper planning, and reserves for grant matches, provided grants are secured prior to the expiration of DNR approvals.
8/27/2026
46
PROGRAM/ 2027 2027 2027
CATEGORY PROGRAM/PROJECT PROJECT # PRIORITY PURPOSE Requested Defunded Approved
Parks HWY 57 Trail PARKS-28-01 4 -Critical Need/Obligated/Within 6-12 Months New Program/Service 17,202$
Parks Village Hall Painting PARKS-27-01 5 -Mandated/Mission Driven/Immediate Need Replace Worn Out Equipment 25,000$
Parks Post Office Painting PARKS-27-02 5 -Mandated/Mission Driven/Immediate Need Replace Worn Out Equipment 18,000$
Parks Logerquist Re-Roofing PARKS-27-03 3 -Preventive Need/Public Benefit/1-2 Years Replace Worn Out Equipmen t 10,000$
Parks Hwy 42 Trail to Ephraim PARKS-28-02 3 -Preventive Need/Public Benefit/1-2 Years New Pro gram/Service 144,963$
Parks Waterfront Playground Equipment PARKS-28-03 2 -Improvement Benefit/Desired Want/2-3 Years Replace Worn Out Equipment -$
Parks Dog Park Renovations PARKS-29-01 2 -Improvement Benefit/Desired Want/2-3 Years Expanded Service -$
Parks Pebble Beach Parking, Restrooms, Overlook PARKS-29-02 3 -Preventive Need/Public Benefit/1-2 Years New Pro gram/Service -$
Parks Hwy 57 Trail - Phase II Expansion PARKS-30-01 2 -Improvement Benefit/Desired Want/2-3 Years New Program/Service -$
Parks Misc. Trails PARKS-31-01 3 -Preventive Need/Public Benefit/1-2 Years New Pro gram/Service -$
Budget Funding Totals 215,165 - $ - $
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027 RECOMMENDED BUDGET
CAPITAL EXPENDITURES
47
YEAR RANKING Estimated
CATEGORY PLANNED CRITERIA PURPOSE Cost
Parks Parks Urban Garden 2031 3 - Long Term Expanded Service 50,000$
Parks E quipment Re place sports complex bleachers 2031 4 - Future Scheduled Replacement 20,000$
Parks E quipment S ports Complex playground equipment 2035 4 - Future Scheduled Replacement 15,000$
Parks E quipment Athletic Field Li ghts 2035 3 - Long Term Replace Worn Out Equipment 150,000$
Budget Funding Totals 235,000 $
RANKING CRITERIA FOR FUTURE PROJECTS - when resources are available: PURPOSE
1 - Immediate: May be moved to the 5-Year plan within a year. Scheduled Replacement
2 - Near Term: May be moved to the 5-Year plan in 2-3 years. Current Equipment Obsolete
3 - Long Term: May be moved to the 5-Year plan in 4-5 years. Replace Worn Out Equipment
4 - Future: Anticipated but not yet scheduled. New Program/Service
Expanded Service
Increase Safety
Improve Policies/Procedures
Reduce Personnel Time
PROGRAM/PROJECT
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
CAPITAL EXPENDITURE PLANNING
BEYOND 5-YEAR PERIOD
48
YEAR RANKING Estimated
CATEGORY PLANNED CRITERIA PURPOSE Cost
Public Works Facilities Gazebo - Waterfront Park 2031 3 - Long Term Scheduled Replacement 15,000 $
Public Works E quipment Re place sports complex bleachers 2031 4 - Future Scheduled Replacement 20,000 $
Public Works E quipment John Deere Lar ge Area Riding Mower/Blower/Sweeper 2031 3 - Long Term Scheduled Replacement 45,000 $
Public Works E quipment 2021 Golf Cart 2031 4 - Future Scheduled Replacement 10,000 $
Public Works E quipment Re place 2018 51" Snowblower Attachment Z51B 2033 4 - Future Scheduled Replacement 10,000 $
Public Works E quipment Re place 60" Power Angling Sweeper (2018) 2033 3 - Long Term Scheduled Replacement 7,000 $
Public Works E quipment Re place 2011 Ryan Tracaire Lawn Aerator 2035 3 - Long Term Scheduled Replacement 5,200 $
Public Works E quipment S ports Complex playground equipment 2035 4 - Future Scheduled Replacement 15,000 $
Public Works E quipment Athletic Field Li ghts 2035 3 - Long Term Replace Worn Out Equipment 150,000$
Public Works E quipment Boat Parade Float & Traile r 2035 4 - Future Replace Worn Out Equipment 15,000 $
Budget Funding Totals 292,200 $
PROGRAM/PROJECT
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
CAPITAL EXPENDITURE PLANNING
BEYOND 5-YEAR PERIOD
49
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
SUMMARY OF FUNDS
2027 2028 2029 2030 2031 Total
EST. BEGINNING FUND BALANCE 1,066,147.00$ 1,066,147.00 $ 1,066,147.00 $ 1,066,147.00 $ 1,066,147.00 $
FUNDING SOURCES
CAPITAL PROJECTS LEVY 100,000.00$ 100,000.00 $ 100,000.00 $ 100,000.00 $ 100,000.00 $ 500,000.00 $
GENERAL FUND LEVY -$ - $ - $ - $ - $ - $
BOND PROCEEDS 1,645,000.00$ - $ - $ - $ - $ 1,645,000.00$
GRANTS -$ - $ - $ - $ - $ - $
PREMIER RESORT AREA TAX 355,000.00$ - $ - $ - $ - $ 355,000.00$
OTHER SOURCE -$ - $ - $ - $ - $ - $
TOTAL SOURCES 2,100,000.00$ 100,000.00 $ 100,000.00$ 100,000.00$ 100,000.00$ 2,500,000.00$
TOTAL AVAILABLE FUNDS 3,166,147.00$ 1,166,147.00 $ 1,166,147.00 $ 1,166,147.00 $ 1,166,147.00 $
USES BY CATEGORY
Streets 2,100,000.00 $ 100,000.00 $ 100,000.00 $ 100,000.00 $ 100,000.00 $ 2,500,000.00 $
TOTAL USES BY CATEGORY 2,100,000.00$ 100,000.00 $ 100,000.00$ 100,000.00$ 100,000.00$ 2,500,000.00$
EST. ENDING FUND BALANCE 1,066,147.00$ 1,066,147.00 $ 1,066,147.00 $ 1,066,147.00 $ 1,066,147.00 $
8/27/2026
50
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
SUMMARY OF FUNDS
2027 2028 2029 2030 2031 Total
EST. BEGINNING FUND BALANCE -$ - $ - $ - $ - $
FUNDING SOURCES
CAPITAL PROJECTS LEVY 10,500.00$ 15,000.00 $ 2,500.00 $ 17,500.00 $ 3,000.00 $ 48,500.00 $
GENERAL FUND LEVY -$ - $ - $ - $ - $ - $
BOND PROCEEDS -$ - $ - $ - $ - $ - $
GRANTS -$ - $ - $ - $ - $ - $
PREMIER RESORT AREA TAX -$ - $ - $ - $ - $ - $
OTHER SOURCE 10,500.00$ 15,000.00 $ 2,500.00 $ 17,500.00 $ 3,000.00 $ 48,500.00 $
TOTAL SOURCES 21,000.00$ 30,000.00$ 5,000.00$ 35,000.00$ 6,000.00$ 97,000.00$
TOTAL AVAILABLE FUNDS 21,000.00$ 30,000.00 $ 5,000.00 $ 35,000.00 $ 6,000.00 $
USES BY CATEGORY
Library 21,000.00$ 30,000.00 $ 5,000.00 $ 35,000.00 $ 6,000.00 $ 97,000.00 $
TOTAL USES BY CATEGORY 21,000.00$ 30,000.00$ 5,000.00$ 35,000.00$ 6,000.00$ 97,000.00$
EST. ENDING FUND BALANCE -$ - $ - $ - $ - $
8/27/2026
51
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
2027 2028 2029 2030 2031 Total
EST. BEGINNING FUND BALANCE - $ - $ - $ - $ - $
FUNDING SOURCES
CAPITAL PROJECTS LEVY 10,500$ 15,000 $ 2,500$ 17,500$ 3,000$ 48,500 $
GENERAL FUND LEVY - $ - $ - $ - $ - $ - $
BOND PROCEEDS - $ - $ - $ - $ - $ - $
GRANTS - $ - $ - $ - $ - $ - $
PREMIER RESORT AREA TAX - $ - $ - $ - $ - $ - $
OTHER SOURCE 10,500$ 15,000 $ 2,500$ 17,500$ 3,000$ 48,500 $
TOTAL SOURCES 21,000$ 30,000 $ 5,000$ 35,000$ 6,000$ 97,000 $
TOTAL AVAILABLE FUNDS 21,000 $ 30,000 $ 5,000 $ 35,000 $ 6,000 $
USES BY PROGRAM/PROJECT PROGRAM/PROJECT #
Cement Step Work LB-27-01 6,000$ -$ - $ - $ - $ 6,000$
Restripe Parking Lot LB-27-02 5,000$ -$ - $ - $ - $ 5,000$
Interior Painting - Lower Walls LB-27-03 10,000$ -$ - $ - $ - $ 10,000$
Exterior Painting LB-28-01 - $ 20,000$ - $ - $ - $ 20,000$
New Tech Patio Awning LB-28-02 -$ 10,000$ -$ - $ - $ 10,000$
Sound Reduction Panels LB-29-01 - $ - $ 5,000$ -$ - $ 5,000$
Carpeting LB-30-01 - $ - $ - $ 35,000$ -$ 35,000$
Replace Sail Shades LB-31-01 - $ - $ - $ - $ 6,000$ 6,000$
TOTAL USES BY PROJECT 21,000$ 30,000 $ 5,000$ 35,000$ 6,000$ 97,000 $
EST. ENDING FUND BALANCE - $ - $ - $ - $ - $
Library
8/27/2026
52
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Cement Step Work 6,000 $ -$ -$ -$ -$ 6,000$
Total 6,000 $ -$ -$ -$ -$ 6,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Capital Projects Levy 3,000 $ -$ -$ -$ 3,000$
Other Source 3,000 $ -$ -$ -$ 3,000$
Total 3,000 $ -$ -$ -$ -$ 3,000$
Budget Impact/Other
20 years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
Library Library
Cement Step Work Sheila Bristol
LB-27-01 Library
Financial impact to budget - $6,000 with $3,000 covered by capital levy and remaining $3,000 covered by Town of Liberty Grove.
4 -Critical Need/Obligated/Within 6-12 Months
Increase Safety
Replace front steps
Original corners/crevasses missing cement
8/27/2026
53
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
\ Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Restripe Parking Lot 5,000 $ 5,000$
Total 5,000 $ - $ - $ - $ -$ 5,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Capital Projects Levy 2,500 $ 2,500$
Other Source 2,500 $
Total 2,500 $ - $ - $ - $ -$ 2,500$
Budget Impact/Other
20 years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2023-2027
Library Library
Restripe Parking Lot Sheila Bristol
LB-27-02 Library
Financial impact to budget - $5,000 with $2,500 covered by capital levy and remaining $2,500 covered by Town of Liberty Grove.
4 -Critical Need/Obligated/Within 6-12 Months
Replace Worn Out Equipment
Restripe and seal coat the parking lot.
Some areas need patching to surface. Lines and handicap spot need new stripping.
54
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Note: Program/Project Name and # Referenced on Category Sheet. Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Interior Painting - Lower Walls 10,000 $ -$ -$ -$ -$ 10,000$
Total 10,000 $ -$ -$ -$ -$ 10,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Capital Projects Levy 5,000 $ -$ -$ -$ -$ 5,000$
Other Source 5,000 $ -$ -$ -$ -$ 5,000$
Total 10,000 $ -$ -$ -$ -$ 10,000$
Budget Impact/Other
Sheila Bristol
Library
Financial impact to budget - $10,000 in 2026 with $5,000 to be covered by capital levy and $5,000 covered by the Town of Liberty Grove.
3 -Preventive Need/Public Benefit/1-2 Years
Replace Worn Out Equipment
Repaint interior, lower walls
Paint needs touch ups in many areas, bathrooms repainted 2 years ago. Was $5,000 now $10,000.
10 years
Interior Painting - Lower Walls
LB-27-03
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
PROJECT OR PROGRAM / DESCRIPTION & JUSTICATION
LibraryLibrary
8/27/2026
55
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Note: Program/Project Name and # Referenced on Category Sheet. Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Exterior Painting -$ 20,000 $ -$ -$ -$ 20,000$
Total -$ 20,000 $ -$ -$ -$ 20,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Capital Projects Levy -$ 10,000 $ -$ -$ -$ 10,000$
Other Source -$ 10,000 $ -$ -$ -$ 10,000$
Total -$ 10,000 $ -$ -$ -$ 10,000$
Budget Impact/Other
10 years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
PROJECT OR PROGRAM / DESCRIPTION & JUSTICATION
Library Library
Exterior Painting Sheila Bristol
LB-28-01 Library
Financial impact to budget - $20,000 in 2028 to be covered by $10,000 capital levy with remaining $10,000 to be covered by Town of Liberty Grove.
1 -Maintain/Public Want/Greater than 3 Years
Replace Worn Out Equipment
Repaint the exterior of the building and perform some repairs on the building
Originally quoated at $10,000 but now $20,000
8/27/2026
56
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Note: Program/Project Name and # Referenced on Category Sheet. Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
New Tech Patio Awning -$ 10,000 $ -$ -$ 10,000$
Total -$ 10,000 $ -$ -$ -$ 10,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Capital Projects Levy -$ 5,000$ - $ - $ - $ 5,000$
Other Source - $ 5,000$ - $ - $ - $ 5,000$
Total -$ 5,000$ - $ - $ - $ 5,000$
Budget Impact/Other
10 years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
PROJECT OR PROGRAM / DESCRIPTION & JUSTICATION
Library
Sheila Bristol
Library
Library
New Tech Patio Awning
LB-28-02
Financial impact to budget - $10,000 with $5,000 to be covered by capital levy and $5,000 covered by the Town of Liberty Grove.
2 -Improvement Benefit/Desired Want/2-3 Years
Replace Worn Out Equipment
New Tech Patio Awning
Replace sailshade on building-Sunsetter motorized 20ft wide by 10ft length.
8/27/2026
57
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Note: Program/Project Name and # Referenced on Category Sheet. Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Sound Reduction Panels -$ 5,000 $ - $ - $ 5,000$
Total -$ - $ 5,000$ - $ - $ 5,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Capital Projects Levy -$ - $ 2,500$ - $ - $ 2,500$
Other Source - $ - $ 2,500$ - $ - $ 2,500$
Total -$ - $ 5,000$ - $ - $ 5,000$
Budget Impact/Other
10 years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
PROJECT OR PROGRAM / DESCRIPTION & JUSTICATION
Library
Sheila Bristol
Library
Library
Sound Reduction Panels
LB-29-01
Financial impact to budget - $5,000 in 2029, with $2,500 to be covered by capital levy and $2,500 covered by the Town of Liberty Grove.
2 -Improvement Benefit/Desired Want/2-3 Years
Current Equipment Obsolete
Sound Reduction Panels
Sound Reduction Panels needed in children's area, conference room and possibly other areas due to high open ceillings.
8/27/2026
58
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Carpeting -$ - $ - $ 35,000$ - $ 35,000$
Total -$ - $ - $ 35,000$ - $ 35,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Capital Projects Levy -$ - $ - $ 17,500$ - $ 17,500$
Other Source - $ - $ - $ 17,500$ - $ 17,500$
Total -$ - $ - $ 17,500$ - $ 17,500$
Budget Impact/Other
10 years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
PROJECT OR PROGRAM / DESCRIPTION & JUSTICATION
Library Library
Carpeting Sheila Bristol
LB-30-01 Library
Financial impact to budget - $35,000 in 2030 with $17,500 to be covered by capital levy and $17,500 covered by the Town of Liberty Grove.
2 -Improvement Benefit/Desired Want/2-3 Years
Replace Worn Out Equipment
Carpeting
8/27/2026
59
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Replace Sail Shades 6,000$ 6,000$
Total - $ - $ - $ - $ 6,000$ 6,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Capital Projects Levy 3,000$ 3,000$
Other Source 3,000$ 3,000$
Total - $ - $ - $ - $ 3,000$ 3,000$
Budget Impact/Other
10 years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2023-2027
Library Library
Replace Sail Shades Sheila Bristol
LB-31-01 Library
Financial impact to budget - $6,000 in 2031 with $3,000 to be covered by capital levy and $3,000 covered by the Town of Liberty Grove.
1 -Maintain/Public Want/Greater than 3 Years
Replace Worn Out Equipment
Replace sail shades; two options available - 1) Sunsetter manual, prince is without taxes or installation ($5,475); and 2.) Sunsetter Motorized 20ft wide
by 10' long ($5,775).
60
PROGRAM/ 2027 2027 2027
CATEGORY PROGRAM/PROJECT PROJECT # PRIORITY PURPOSE Requested Defunded Approved
Library Cement Step Work LB-27-01 4 -Critical Need/Obligated/Within 6-12 Months Increase Safety 3,000$
Library Restripe Parking Lot LB-27-02 4 -Critical Need/Obligated/Within 6-12 Months Replace Worn Out Equipment 2,500$
Library Interior Painting - Lower Walls LB-27-03 3 -Preventive Need/Public Benefit/1-2 Years Re place Worn Out Equipment 5,000$
Library Exterior Painting LB-28-01 1 -Maintain/Public Want/Greater than 3 Years Replace Worn Out Equipment -$
Library New Tech Patio Awning LB-28-02 2 -Improvement Benefit/Desired Want/2-3 Years Replace Worn Out Equipment -$
Library Sound Reduction Panels LB-29-01 2 -Improvement Benefit/Desired Want/2-3 Years Current Equipment Obsolete -$
Library Carpeting LB-30-01 2 -Improvement Benefit/Desired Want/2-3 Years Replace Worn Out Equipment -$
Library Replace Sail Shades LB-31-01 1 -Maintain/Public Want/Greater than 3 Years Replace Worn Out Equipment -$
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027 RECOMMENDED BUDGET
CAPITAL EXPENDITURES
61
YEAR RANKING Estimated
CATEGORY PLANNED CRITERIA PURPOSE Cost
Library Roo f 2043 4 - Future Scheduled Replacement 50,000$
Budget Funding Totals 50,000 $
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
CAPITAL EXPENDITURE PLANNING
BEYOND 5-YEAR PERIOD
PROGRAM/PROJECT
62
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
SUMMARY OF FUNDS
2027 2028 2029 2030 2031 Total
EST. BEGINNING FUND BALANCE 100,000.00$ 200,000.00 $ 300,000.00 $ 300,000.00 $ 400,000.00 $
FUNDING SOURCES
CAPITAL PROJECTS LEVY 100,000$ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000 $
GENERAL FUND LEVY -$ - $ - $ - $ - $ - $
BOND PROCEEDS -$ - $ - $ - $ - $ - $
GRANTS -$ - $ - $ - $ - $ - $
PREMIER RESORT AREA TAX -$ - $ - $ - $ - $ - $
OTHER SOURCE -$ - $ - $ - $ - $ - $
TOTAL SOURCES 100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 500,000$
TOTAL AVAILABLE FUNDS 200,000$ 300,000 $ 400,000 $ 400,000 $ 500,000 $
USES BY CATEGORY
Ice Rink -$ -$ -$ -$ 500,000$ 500,000$
TOTAL USES BY CATEGORY -$ -$ -$ -$ 500,000$ 500,000$
EST. ENDING FUND BALANCE 200,000$ 300,000 $ 400,000 $ 400,000 $ - $
8/27/2026
63
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
2027 2028 2029 2030 2031 Total
EST. BEGINNING FUND BALANCE 100,000$ 200,000$ 300,000$ 300,000$ 400,000$
FUNDING SOURCES
CAPITAL PROJECTS LEVY 100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 500,000$
GENERAL FUND LEVY -$ - $ - $ - $ - $ - $
BOND PROCEEDS -$ - $ - $ - $ - $ - $
GRANTS -$ - $ - $ - $ - $ - $
PREMIER RESORT AREA TAX -$ - $ - $ - $ - $ - $
OTHER SOURCE -$ - $ - $ - $ - $ - $
TOTAL SOURCES 100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 500,000$
TOTAL AVAILABLE FUNDS 200,000$ 300,000 $ 400,000 $ 400,000 $ 500,000 $
USES BY PROGRAM/PROJECT PROGRAM/PROJECT #
Community Center-Warming House IR-27-01 - $ - $ - $ - $ 500,000$ 500,000 $
TOTAL USES BY PROJECT -$ - $ - $ - $ 500,000$ 500,000 $
EST. ENDING FUND BALANCE 200,000$ 300,000 $ 400,000 $ 400,000 $ - $
Ice Rink
8/27/2026
64
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Community Center-Warming House -$ - $ - $ - $ 500,000$ 500,000$
Total -$ - $ - $ - $ 500,000$ 500,000 $
Funding Sources 2027 2028 2029 2030 2031 Total
Capital Projects Levy 100,000$ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000$
Total 100,000$ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000 $
Budget Impact/Other
Ice Rink Manager
Facilities
Financial Impact to budget of $500,000.
1 -Maintain/Public Want/Greater than 3 Years
Expanded Service
Expansion and renovation of the warming house for the ice rink.
Expanded concessions and storage facility, social space.
20 years
Community Center-Warming House
IR-27-01
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
Ice RinkIce Rink
8/27/2026
65
PROGRAM/ 2027 2027 2027
CATEGORY PROGRAM/PROJECT PROJECT # PRIORITY PURPOSE Requested Defunded Approved
Ice Rink Community Center-Warming House IR-27-01 1 -Maintain/Public Want/Greater than 3 Years Expanded Service 100,000$ - $ - $
Budget Funding Totals 100,000$ - $ - $
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027 RECOMMENDED BUDGET
CAPITAL EXPENDITURES
66
YEAR RANKING Estimated
CATEGORY PLANNED CRITERIA PURPOSE Cost
Budget Funding Totals - $
PROGRAM/PROJECT
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
CAPITAL EXPENDITURE PLANNING
BEYOND 5-YEAR PERIOD
67
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
SUMMARY OF FUNDS
2027 2028 2029 2030 2031 Total
EST. BEGINNING FUND BALANCE 1,013,144$ 1,013,144$ 1,013,144$ 1,013,144$ 1,013,144$
FUNDING SOURCES
CAPITAL PROJECTS LEVY -$ -$ -$ -$ -$ -$
GENERAL FUND LEVY -$ -$ -$ -$ -$ -$
BOND PROCEEDS -$ -$ -$ -$ -$ -$
GRANTS -$ -$ -$ -$ -$ -$
PREMIER RESORT AREA TAX -$ -$ -$ -$ -$ -$
OTHER SOURCE 585,000$ 50,000$ 50,000$ 72,500$ 180,000$ 937,500$
TOTAL SOURCES 585,000$ 50,000$ 50,000$ 72,500$ 180,000$ 937,500$
TOTAL AVAILABLE FUNDS 1,598,144$ 1,063,144 $ 1,063,144 $ 1,085,644 $ 1,193,144 $
USES BY CATEGORY
Water 585,000$ 50,000 $ 50,000 $ 72,500 $ 180,000 $ 937,500 $
TOTAL USES BY CATEGORY 585,000$ 50,000 $ 50,000 $ 72,500 $ 180,000 $ 937,500 $
EST. ENDING FUND BALANCE 1,013,144$ 1,013,144 $ 1,013,144 $ 1,013,144 $ 1,013,144 $
8/27/2026
68
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
2027 2028 2029 2030 2031 Total
EST. BEGINNING FUND BALANCE 1,013,144$ 1,013,144 $ 1,013,144 $ 1,013,144 $ 1,013,144 $
FUNDING SOURCES
CAPITAL PROJECTS LEVY -$ - $ - $ - $ - $ - $
GENERAL FUND LEVY -$ - $ - $ - $ - $ - $
BOND PROCEEDS -$ - $ - $ - $ - $ - $
GRANTS -$ - $ - $ - $ - $ - $
PREMIER RESORT AREA TAX -$ - $ - $ - $ - $ - $
OTHER SOURCE 585,000$ 50,000 $ 50,000 $ 72,500 $ 180,000 $ 937,500 $
TOTAL SOURCES 585,000$ 50,000 $ 50,000 $ 72,500 $ 180,000 $ 937,500 $
TOTAL AVAILABLE FUNDS 1,598,144$ 1,063,144 $ 1,063,144 $ 1,085,644 $ 1,193,144 $
USES BY PROGRAM/PROJECT PROGRAM/PROJECT #:
Annual Meter Replacement WATER-27-01 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 250,000$
Well No. 3 Rebuild/ Inspection WATER-27-02 30,000$ -$ -$ -$ -$ 30,000$
Booster Pump Replacement WATER-27-03 75,000$ -$ -$ -$ -$ 75,000$
PRV Installation WATER-27-04 150,000$ -$ -$ -$ -$ 150,000$
HWY 57 Water Extension WATER-27-05 280,000$ -$ -$ -$ -$ 280,000$
2020 Truck Replacement WATER-30-01 -$ -$ -$ 22,500$ -$ 22,500$
Water Tower Painting WATER-31-01 -$ -$ -$ -$ 130,000$ 130,000$
TOTAL USES BY PROJECT 585,000$ 50,000 $ 50,000 $ 72,500 $ 180,000 $ 937,500 $
EST. ENDING FUND BALANCE 1,013,144$ 1,013,144 $ 1,013,144 $ 1,013,144 $ 1,013,144 $
Water
8/27/2026
69
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Annual Meter Replacement 50,000$ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 250,000$
Total 50,000$ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 250,000 $
Funding Sources 2027 2028 2029 2030 2031 Total
Other Source 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 250,000$
Total 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 250,000$
Budget Impact/Other
10 years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
Water Water
Annual Meter Replacement Utility Director
WATER-27-01 Equipment
Financial Impact to water fund of $50,000. Funding from operating funds, annually.
5 -Mandated/Mission Driven/Immediate Need
Scheduled Replacement
Meter replacement per schedule and new meters for expanded services. New meters for planned developments and to replace worn or broken meters. Capitalized, despite individual costs and pieces
being less than $5000.
Meter replacement due to age, disrepair, and new meters for new builds.10 year replacement cycle on all 3/4" meters. Also in the process of upgrading transmitters to cellular capabilities as part of the 10
year meter replacement cycle.
8/27/2026
70
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Note: Program/Project Name and # Referenced on Category Sheet. Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Well No. 3 Rebuild/ Inspection 30,000 $ - $ - $ -$ -$ 30,000$
Total 30,000 $ - $ - $ -$ -$ 30,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Other Source 30,000 $ - $ - $ -$ -$ 30,000$
Total 30,000 $ - $ - $ -$ -$ 30,000$
Budget Impact/Other
Financial impact to budget - $30,000 in 610-61500-369-602. Replacement funds will be moved to operating funds to cover the cost of the rebuild. Funds will be spent in either 2026
or 2027, depending on project coordination with contractor.
3 -Preventive Need/Public Benefit/1-2 Years
Scheduled Replacement
Part of the DNR's required maintenance schedule is to rebuild wells every 10 years. Last completed in 2015. Maintenance item. Planned and budgetedfor 2026 but based on potential
contractor scheduling timeframe, carrying forward to 2027 in case project contractor cannot schedule/coordinate work before the end of 2026.
Part of regular maintenance schedule. Well No. 3 works harder than the other two wells which will likely result in more cost for replacements of impellors, screen, motor repair, etc.
Well 3 has never been chemically rehabilitated, recommend chemical rehabiliation if there is significant biofilm buildup. Cost of potential chemical treatment included.
Well No. 3 Rebuild/ Inspection Utility Director
WATER-27-02 Equipment
10 years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
Water Water
8/27/2026
71
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Note: Program/Project Name and # Referenced on Category Sheet. Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Booster Pump Replacement 75,000 $ 75,000$
Total 75,000 $ - $ - $ - $ -$ 75,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Other Source 75,000 $ 75,000$
Total 75,000 $ - $ - $ - $ -$ 75,000$
Budget Impact/Other
20 years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
Water Water
Booster Pump Replacement Megan Barnes
WATER-27-03 Equipment
Financial impact of $0. Funding from water replacement funds - $75,000
1 -Maintain/Public Want/Greater than 3 Years
Replace Worn Out Equipment
Replace booster pumps at Well 2 with two Gould's 20 hp e-SV Multistage pumps .
Booster pumps are original and have never been replaced. Current motors have a history of operational problems. Moving from 2026 to 2027.
72
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Note: Program/Project Name and # Referenced on Category Sheet. Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
PRV Installation 150,000$ 150,000$
Total 150,000$ - $ - $ -$ -$ 150,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Other Source 150,000$ 150,000$
Total 150,000$ - $ - $ -$ -$ 150,000$
Budget Impact/Other
20 years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
Water Water
PRV Installation Megan Barnes
WATER-27-04 Equipment
New infrastracture cost cannot come out from replacement funds-capital contribution.
3 -Preventive Need/Public Benefit/1-2 Years
New Program/Service
A new PRV needs to be installed to reduce high water distribution system pressures on Little Sister Road. A new PRV should be installed on S Bayshore to
regulate pressures on that side of the system. Moving project out from 2026 to 2027. Location/engineering for install still needs to be completed and
identified.
Reduce pressure
73
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Note: Program/Project Name and # Referenced on Category Sheet. Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
HWY 57 Water Extension 280,000$ - $ 280,000$
Total 280,000$ - $ - $ -$ -$ 280,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Other Source 280,000$ - $ 280,000$
Total 280,000$ - $ - $ -$ -$ 280,000$
Budget Impact/Other
20 years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
Water Water
HWY 57 Water Extension Megan Barnes
WATER-27-05 Equipment
New infrastracture cost cannot come out from replacement funds-capital contribution. OPC for erosion control, restoration split between Water and Collection
($226,300 estimated total, Water side to fund $113,150). Water pipe and appertuences estimate is $155,700. Total estimated cost to water fund would total
$268,850.
1 -Maintain/Public Want/Greater than 3 Years
Ex
panded Service
Extend water service to the Deviley property. Extend water main as well as service laterals to the Deviley property, and the patio property and continue
extension to Northwoods Dr by the Veterinary Clinic.
Public desire/infrastructure install desired prior to HWY 57 trail install.
74
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Note: Program/Project Name and # Referenced on Category Sheet. Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
2020 Truck Replacement -$ - $ 22,500 $ 22,500$
Total -$ - $ - $ 22,500$ - $ 22,500$
Funding Sources 2027 2028 2029 2030 2031 Total
Other Source -$ -$ 22,500$ 22,500$
Total -$ -$ -$ 22,500$ -$ 22,500$
Budget Impact/Other
Financial impact to budget of $0. Remaining source of funds from water replacement funds - $22,500.
1 -Maintain/Public Want/Greater than 3 Years
Scheduled Replacement
Replace the 2020 Chevy Silverado with a similar truck, must be set up for meter reading. Trade in 2020 truck or sell and use funds to offset purchase price.
Scheduled Replacement
2020 Truck Replacement Megan Barnes
WATER-30-01 Vehicle
10 years
CAPITAL IMPROVEMENT PLAN
2027-2031
Water Water
8/27/2026
75
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Water Tower Painting -$ - $ - $ - $ 130,000$ 130,000$
Total -$ - $ - $ - $ 130,000$ 130,000 $
Funding Sources 2027 2028 2029 2030 2031 Total
Other Source -$ -$ -$ -$ 130,000$ 130,000$
Total -$ -$ -$ -$ 130,000$ 130,000$
Budget Impact/Other
Financial impact to budget - $130,000 in 610-61500-366-000. Replacement funds will be moved to operating funds to cover the cost of the repainting.
3 -Preventive Need/Public Benefit/1-2 Years
Scheduled Replacement
Scheduled maintenance item. Jungwirth Ct Water Tower.
Part of regular maintenance schedule.
Water Tower Painting Megan Barnes
WATER-31-01 Equipment
15 years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
Water Water
8/27/2026
76
PROGRAM/ 2027 2027 2027
CATEGORY PROGRAM/PROJECT PROJECT # PRIORITY PURPOSE Requested Defunded Approved
Water Annual Meter Replacement WATER-27-01 5 -Mandated/Mission Driven/Immediate Need Scheduled Replacement 50,000 $
Water Well No. 3 Rebuild/ Inspection WATER-27-02 3 -Preventive Need/Public Benefit/1-2 Years Scheduled Replacement 30,000 $
Water Booster Pump Replacement WATER-27-03 1 -Maintain/Public Want/Greater than 3 Years Replace Worn Out Equipment 75,000$
Water PRV Installation WATER-27-04 3 -Preventive Need/Public Benefit/1-2 Years New Pro gram/Service 150,000$
Water HWY 57 Water Extension WATER-27-05 1 -Maintain/Public Want/Greater than 3 Years Expanded Service 280,000$
Water 2020 Truck Replacement WATER-30-01 1 -Maintain/Public Want/Greater than 3 Years Scheduled Replacement -$
Water Water Tower Painting WATER-31-01 3 -Preventive Need/Public Benefit/1-2 Years Scheduled Replacement - $
Budget Funding Totals 585,000$ - $ - $
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027 RECOMMENDED BUDGET
CAPITAL EXPENDITURES
77
YEAR RANKING Estimated
CATEGORY PLANNED CRITERIA PURPOSE Cost
Water Well 1 Rehabilitation 2036 4 - Future Scheduled Replacement $15,000
Water Well 2 Rehabilitation 2036 4 - Future Scheduled Replacement $35,000
Water Well 3 Rehabilitation 2036 4 - Future Scheduled Replacement $35,000
Budget Funding Totals $85,000
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
CAPITAL EXPENDITURE PLANNING
BEYOND 5-YEAR PERIOD
PROGRAM/PROJECT
78
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
SUMMARY OF FUNDS
2027 2028 2029 2030 2031 Total
EST. BEGINNING REPL FUND BALANCE 2,390,868.00$ 2,390,868.00 $ 2,390,868.00$ 2,390,868.00$ 2,390,868.00$
FUNDING SOURCES
CAPITAL PROJECTS LEVY -$ -$ 8,900,000$ -$ -$ 8,900,000$
GENERAL FUND LEVY -$ -$ -$ -$ -$ -$
BOND PROCEEDS -$ -$ -$ -$ -$ -$
GRANTS -$ -$ 8,900,000$ -$ -$ 8,900,000$
PREMIER RESORT AREA TAX -$ -$ -$ -$ -$ -$
OTHER SOURCE 12,000$ 10,000$ 2,876,500$ 67,000$ 72,000$ 3,049,500$
TOTAL SOURCES 12,000$ 10,000$ 20,676,500$ 67,000$ 72,000$ 20,849,500$
TOTAL AVAILABLE FUNDS 2,402,868$ 2,400,868 $ 23,067,368 $ 2,457,868 $ 2,462,868 $
USES BY CATEGORY
WWTP 12,000 $ 10,000 $ 20,676,500$ 67,000$ 72,000$ 20,849,500$
TOTAL USES BY CATEGORY 12,000$ 10,000$ 20,676,500$ 67,000$ 72,000$ 20,849,500$
EST. ENDING FUND BALANCE 2,390,868$ 2,390,868 $ 2,390,868 $ 2,390,868 $ 2,390,868 $
8/27/2026
79
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
2027 2028 2029 2030 2031 Total
EST. BEGINNING REPL FUND BALANCE 2,390,868$ 2,390,868 $ 2,390,868 $ 2,390,868 $ 2,390,868 $
FUNDING SOURCES
CAPITAL PROJECTS LEVY -$ - $ 8,900,000$ - $ - $ 8,900,000$
GENERAL FUND LEVY -$ - $ - $ - $ - $ - $
BOND PROCEEDS -$ - $ - $ - $ - $ - $
GRANTS -$ - $ 8,900,000$ - $ - $ 8,900,000$
PREMIER RESORT AREA TAX -$ - $ - $ - $ - $ - $
OTHER SOURCE 12,000$ 10,000 $ 2,876,500$ 67,000 $ 72,000 $ 3,037,500$
TOTAL SOURCES 12,000$ 10,000$ 20,676,500$ 67,000$ 72,000$ 20,837,500$
TOTAL AVAILABLE FUNDS 2,402,868$ 2,400,868 $ 23,067,368 $ 2,457,868 $ 2,462,868 $
USES BY PROGRAM/PROJECT PROGRAM/PROJECT #
BOD Incubator WWTP-27-01 12,000 $ - $ - $ - $ - $ 12,000$
UV Light Replacement WWTP-28-01 - $ 10,000$ - $ 10,000$ - $ 20,000$
Aeration-Flow Equal Tank WWTP-29-01 - $ - $ 295,400$ - $ - $ 295,400$
Aeration-Oxidation Ditch WWTP-29-02 - $ - $ 2,113,500$ - $ - $ 2,113,500$
Clarifier Cover WWTP-29-03 - $ - $ 296,800$ - $ - $ 296,800$
WAS Pump 2 WWTP-29-04 - $ - $ 170,800$ - $ - $ 170,800$
Sludge System (Dryer or Reed Beds) WWTP-29-05 - $ - $ 17,800,000$ - $ - $ 17,800,000$
Tuttnauer- Digital Autoclave Model #2340M WWTP-30-01 - $ - $ - $ 12,000$ - $ 12,000$
2020 Truck Replacement WWTP-30-02 - $ - $ - $ 45,000$ - $ 45,000$
Lakeside Screen Grit WWTP-31-01 - $ - $ - $ - $ 60,000$ 60,000 $
Rosemount 8750WA Magnetic Flowmeter from WWTP-31-02 - $ - $ - $ - $ 12,000$ 12,000 $
TOTAL USES BY PROJECT 12,000$ 10,000$ 20,676,500$ 67,000$ 72,000$ 20,837,500$
EST. ENDING FUND BALANCE 2,390,868$ 2,390,868 $ 2,390,868 $ 2,390,868 $ 2,390,868 $
WWTP
8/27/2026
80
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 2032 Total
BOD Incubator 12,000$ - $ - $ - $ - $ - $ 12,000$
Total 12,000$ - $ - $ - $ - $ - $ 12,000$
Funding Sources 2027 2028 2029 2030 2031 2032 Total
Other Source 12,000 $ - $ - $ - $ - $ - $ 12,000$
Total 12,000$ - $ - $ - $ - $ - $ 12,000$
Budget Impact/Other
10 years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
WWTP WWTP
BOD Incubator Megan Barnes
WWTP-27-01 Equipment
Financial impact to budget of $0. Remaining source of funds from wastewater replacement funds - $12,000.
1 -Maintain/Public Want/Greater than 3 Years
Scheduled Replacement
Replace Thermo Scientific Precision Incubator purchased in 2017
Scheduled replacement - 10 year life
8/27/2026
81
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Note: Program/Project Name and # Referenced on Category Sheet. Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
UV Light Replacement - $ 10,000$ - $ 10,000 $ - $ 20,000$
Total - $ 10,000$ - $ 10,000 $ - $ 20,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Other Source - $ 10,000$ - $ 10,000$ -$ 20,000$
Total - $ 10,000$ - $ 10,000$ -$ 20,000$
Budget Impact/Other
2 years
CAPITAL IMPROVEMENT PLAN
2027-2031
PROJECT OR PROGRAM / DESCRIPTION & JUSTICATION
WWTP WWTP
UV Light Replacement Megan Barnes
WWTP-28-01 Equipment
Financial impact to budget of $0. Funds from WWTP replacement funds - $10,000 every two years.
3 -Preventive Need/Public Benefit/1-2 Years
Replace Worn Out Equipment
Purchase 25 new lights for the UV disinfection system (24 bulbs for the system and 1 spare). Each bulb costs $400.
Lights should be replaced around every 2 years, when the maximum lamp hours have been exceeded.
82
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Note: Program/Project Name and # Referenced on Category Sheet. Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Aeration-Flow Equal Tank 295,400$ 295,400$
Total - $ - $ 295,400$ - $ -$ 295,400$
Funding Sources 2027 2028 2029 2030 2031 Total 20,676,500$
Other Source 295,400$ 295,400$
Total - $ - $ 295,400$ - $ -$ 295,400$
Budget Impact/Other
ASK: Can replacement funds be used for this if the current aeration system will be replaced? Different system but still same function of aeration. If so,
financial impact to budget $0-replacement funds.
2 -Improvement Benefit/Desired Want/2-3 Years
New Program/Service
Mixing system for flow equalization tank. System includes six nozzles on two headers mounted on the floor of the tank. The nopzzles utilize air from a
compressor to generate large bubbles that travel from the floor of the tank to the surface. The nozzles induce a bottom-up mixing pattern in the tank.
Additional mixing system needed to properly aerate flow equalization tank. Current aeration system sites roughly 10 ft above the lowest point of the floor
in the tank. This leaves a significant volume that is not aerated or mixed, expecially when the tank is drawn down below the diffusers. This system could
be mounted to the floor of the tank, allowing constant aeration if the tank is being utilized.
Aeration-Flow Equal Tank Megan Barnes
WWTP-29-01 Equipment
20 years
VILLAGE OF SISTER BA
Y
CAPITAL IMPROVEMENT PLAN
2027-2031
PROJECT OR PROGRAM / DESCRIPTION & JUSTICATION
WWTP WWTP
83
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Note: Program/Project Name and # Referenced on Category Sheet. Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Aeration-Oxidation Ditch 2,113,500$ 2,113,500$
Total - $ - $ 2,113,500$ - $ -$ 2,113,500$
Funding Sources 2027 2028 2029 2030 2031 Total
Other Source 2,113,500 $ 2,113,500$
Total - $ - $ 2,113,500$ - $ -$ 2,113,500$
Budget Impact/Other
ASK: Can replacement funds be used for this if the current aeration system will be replaced? Different system but still same function of aeration. If so,
financial impact to budget $0-replacement funds.
2 -Improvement Benefit/Desired Want/2-3 Years
Improve Policies/Procedures
Fine bubble diffuser system with submersible mixers to improve mixing and aeration in oxidation ditch.
Improve mixing and aeration in the oxidation ditch. Have had a lot of problems with the current aerators shaft/motor/bearings.
Aeration-Oxidation Ditch Megan Barnes
WWTP-29-02 Equipment
20 Years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
PROJECT OR PROGRAM / DESCRIPTION & JUSTICATION
WWTP WWTP
84
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Note: Program/Project Name and # Referenced on Category Sheet. Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Clarifier Cover 296,800$ 296,800$
Total - $ - $ 296,800$ - $ -$ 296,800$
Funding Sources 2027 2028 2029 2030 2031 Total
Capital Projects Levy 296,800$ 296,800$
Total - $ - $ 296,800$ - $ -$ 296,800$
Budget Impact/Other
New addition-capital improvement
2 -Improvement Benefit/Desired Want/2-3 Years
Improve Policies/Procedures
East clarifier does not currently have a cover. In the future, a cover would allow us to utilize the second clarifier in the winter months.
Allow us to utilize the second clarifier in the winter. Cover will be need to keep the tank from freezing. Would also be helpful in the summer to reduce
algae growth in the tank.
Clarifier Cover Megan Barnes
WWTP-29-03 Equipment-Structure
20 Years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
PROJECT OR PROGRAM / DESCRIPTION & JUSTICATION
WWTP WWTP
85
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Note: Program/Project Name and # Referenced on Category Sheet. Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
WAS Pump 2 170,800$ 170,800$
Total - $ - $ 170,800$ - $ -$ 170,800$
Funding Sources 2027 2028 2029 2030 2031 Total
Capital Projects Levy 170,800$ 170,800$
Total - $ - $ 170,800$ - $ -$ 170,800$
Budget Impact/Other
New addition-capital improvement
2 -Improvement Benefit/Desired Want/2-3 Years
Expanded Service
Add second WAS pump with all necessary piping to allow us to pull WAS off of both clarifiers at the same time (currently can only utilize 1 clarifier and 1
WAS pump)
Would allow us to have both clarifiers online during the summer to slow flow/settling down during those high flow "peak" times.
WAS Pump 2 Megan Barnes
WWTP-29-04 Equipment
20 years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
PROJECT OR PROGRAM / DESCRIPTION & JUSTICATION
WWTP WWTP
86
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Note: Program/Project Name and # Referenced on Category Sheet. Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 2032 Total
Sludge System (Dryer or Reed Beds) -$ - $ 17,800,000$ - $ - $ 17,800,000$
Total -$ - $ 17,800,000$ - $ - $ - $ 17,800,000$
Funding Sources 2027 2028 2029 2030 2031 2032 Total
Grants - $ - $ 8,900,000$ - $ - $ - $ 8,900,000$
Capital Projects Levy - $ - $ 8,900,000$ - $ - $ - $ 8,900,000$
Total -$ - $ 8,900,000$ - $ - $ - $ 8,900,000$
Budget Impact/Other
Financial impact to budget of $8,900,000 from capital improvement for the dryer system, $8,900,000 in grant funds from DNR or USDA. If not funded in part by grants, project may be pushed back or alternative
funding will be addressed. Reed bed system would cost roughly $4,334,100. Option still needs to be selected so largest expense is currently planned until that selection is completed.
2 -Improvement Benefit/Desired Want/2-3 Years
New Program/Service
A sludge dryer system would make our sludge into class A biosolids. They have the ability to turn sludge into 90% solids, and significantly decrease the needed storage space of the sludge, it also means we have less
volume to dispose of. The product would become dry biosolids that could be transported to a landfill for disposal.
McMahon completed a Feasibility Study in which three options were identified for sludge disposal (Class A Biosolids, Reed Beds, Contractual Agreement with Sturgeon Bay Utilities).
At this time, the largest expense is being budgeted for. The dryer system opinion of probable cost was $17,800,000. Reed Beds cost including the other northern Door County WWTP facilities sludge loadings would be
$4,334,100. Option needs to be selected.
Currently we are hauling all of our sludge to NEW Water for further treatment and disposal. This is expensive and also not always a dependable way to dispose of sludge. We are relying on when another facility room for
the sludge and not when we need to get rid of it. In 2025 and 2026, we had to haul to NEW Water due to an upgrade at the Sturgeon Bay WWTP. NEW Water made it very clear that the approval is temporary, not
indefinite. SBUs upgrade has been delayed so the future of Sister Bays sludge disposal is unknown. Another facility may have to be secured if NEW Water cuts us off. With EPA & DNR PFAs regulations that are starting to
be discussed and implemented for regulating PFAs concentrations in land applied sludge, the Village needs to secure a feasible and cost effective option for sludge disposal, as well as getting ahead of the incoming PFAs
restrictions.
Sludge System (Dryer or Reed Beds) Megan Barnes
WWTP-29-05 Equipment
20 years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
PROJECT OR PROGRAM / DESCRIPTION & JUSTIFICATION
WWTP WWTP
8/27/2026
87
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Note: Program/Project Name and # Referenced on Category Sheet. Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 2032 Total
Tuttnauer- Digital Autoclave Model #2340M -$ - $ - $ 12,000$ - $ - $ 12,000$
Total -$ - $ - $ 12,000$ - $ - $ 12,000$
Funding Sources 2027 2028 2029 2030 2031 2032 Total
Other Source - $ - $ - $ 12,000$ - $ - $ 12,000$
Total -$ - $ - $ 12,000$ - $ - $ 12,000$
Budget Impact/Other
10 years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
PROJECT OR PROGRAM / DESCRIPTION & JUSTIFICATION
WWTP WWTP
Tuttnauer- Digital Autoclave Model #2340 Megan Barnes
WWTP-30-01 Equipment
Financial impact to budget of $0. Remaining source of funds from water replacement funds - $12,000.
2 -Improvement Benefit/Desired Want/2-3 Years
Scheduled Replacement
Replacement of Tuttnauer-Digital Autoclave.
Scheduled Replacement
8/27/2026
88
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Note: Program/Project Name and # Referenced on Category Sheet. Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 2032 Total
2020 Truck Replacement -$ - $ - $ 45,000$ - $ - $ 45,000$
Total -$ - $ - $ 45,000$ - $ - $ 45,000$
Funding Sources 2027 2028 2029 2030 2031 2032 Total
Other Source - $ - $ - $ 45,000$ - $ - $ 45,000$
Total -$ - $ - $ 45,000$ - $ - $ 45,000$
Budget Impact/Other
Financial impact to budget of $0. Remaining source of funds from water replacement funds - $45,000.
2 -Improvement Benefit/Desired Want/2-3 Years
Scheduled Replacement
Replace the 2020 Chevy Silverado 2500 with a truck of similar size. Amount below is for this fund's portion of the truck only. Total cost of the truck is $75,000. Trade in 2020 or sell and use funds to offset purchase
price.
Scheduled Replacement
2020 Truck Replacement Megan Barnes
WWTP-30-02 Vehicle
10 years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
PROJECT OR PROGRAM / DESCRIPTION & JUSTIFICATION
WWTP WWTP
8/27/2026
89
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Note: Program/Project Name and # Referenced on Category Sheet. Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Lakeside Screen Grit - $ - $ - $ - $ 60,000$ 60,000$
Total - $ - $ - $ - $ 60,000$ 60,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Other Source - $ - $ - $ - $ 60,000$ 60,000$
Total - $ - $ - $ - $ 60,000$ 60,000$
Budget Impact/Other
20 years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
PROJECT OR PROGRAM / DESCRIPTION & JUSTICATION
WWTP WWTP
Lakeside Screen Grit Megan Barnes
WWTP-31-01 Equipment
Replacement funds
3 -Preventive Need/Public Benefit/1-2 Years
Scheduled Replacement
90
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Note: Program/Project Name and # Referenced on Category Sheet. Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Rosemount 8750WA Magnetic Flowmete - $ - $ - $ - $ 12,000$ 12,000$
Total - $ - $ - $ - $ 12,000$ 12,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Other Source - $ - $ - $ - $ 12,000$ 12,000$
Total - $ - $ - $ - $ 12,000$ 12,000$
Budget Impact/Other
Replacement funds
3 -Preventive Need/Public Benefit/1-2 Years
Scheduled Replacement
Scheduled replacement of flow meter.
Scheduled replacement
Rosemount 8750WA Magnetic Flowmeter from Megan Barnes
WWTP-31-02 Equipment
20 years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
PROJECT OR PROGRAM / DESCRIPTION & JUSTICATION
WWTP WWTP
91
PROGRAM/ 2027 2027 2027
CATEGORY PROGRAM/PROJECT PROJECT # PRIORITY PURPOSE Requested Defunded Approved
WWTP BOD Incubator WWTP-27-01 1 -Maintain/Public Want/Greater than 3 Years Scheduled Replacement 12,000 $
WWTP UV Light Replacement WWTP-28-01 3 -Preventive Need/Public Benefit/1-2 Years Replace Worn Out Equipmen t - $
WWTP Aeration-Flow Equal Tank WWTP-29-01 2 -Improvement Benefit/Desired Want/2-3 Years New Program/Service - $
WWTP Aeration-Oxidation Ditch WWTP-29-02 2 -Improvement Benefit/Desired Want/2-3 Years Improve Policies/Procedures - $
WWTP Clarifier Cover WWTP-29-03 2 -Improvement Benefit/Desired Want/2-3 Years Improve Policies/Procedures - $
WWTP WAS Pump 2 WWTP-29-04 2 -Improvement Benefit/Desired Want/2-3 Years Expanded Service - $
WWTP Sludge System (Dryer or Reed Beds) WWTP-29-05 2 -Improvement Benefit/Desired Want/2-3 Years New Program/Service - $
WWTP Tuttnauer- Digital Autoclave Model #2340M WWTP-30-01 2 -Improvement Benefit/Desired Want/2-3 Years Scheduled Replacement - $
WWTP 2020 Truck Replacement WWTP-30-02 2 -Improvement Benefit/Desired Want/2-3 Years Scheduled Replacement - $
WWTP Lakeside Screen Grit WWTP-31-01 3 -Preventive Need/Public Benefit/1-2 Years Scheduled Replacemen t - $
WWTP Rosemount 8750WA Magnetic Flowmeter from Energenics WWTP-31-02 3 -Preventive Need/Public Benefit/1-2 Years Scheduled Replacemen t - $
Budget Funding Totals 12,000 $ - $ - $
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027 RECOMMENDED BUDGET
CAPITAL EXPENDITURES
92
YEAR RANKING Estimated
CATEGORY PLANNED CRITERIA PURPOSE Cost
WWTP Chemical Feed Equipment - Polymer for slud ge building 2032 3 - Long Term Replace Worn Out Equipment 22,000$
WWTP Forceflow SO2 Scales - 2017 purchased (per pair cost) 2032 3 - Long Term Scheduled Replacement 6,000 $
WWTP Forceflow CL2 Scales - 2017 purchased (per pair cost) 2032 3 - Long Term Scheduled Replacement 6,000 $
WWTP Cummins Diesel Generator - 2004 purchased Model number DFCC-567931 4 2032 3 - Long Term Scheduled Replacement 75,000 $
WWTP Kohler Portable Generator 20KW -2004 purchased 2032 2 - Near Term Replace Worn Out Equipment 30,000$
WWTP Tuthill Gear Pump- Concentrator- Solids Pump - 2020 purchased 2035 3 - Long Term Scheduled Replacement 15,797 $
WWTP Pretreatment Screen 2036 3 - Long Term Replace Worn Out Equipment 72,200$
WWTP Pretreatment Influent Flow Mete r 2036 3 - Long Term Replace Worn Out Equipment 7,100$
WWTP Pump & Grit Conveyor 2036 3 - Long Term Replace Worn Out Equipment 50,200$
WWTP Septa ge & Flow Equalization Pumps 2036 3 - Long Term Replace Worn Out Equipment 27,105$
WWTP Septa ge Receiving Pump 2037 3 - Long Term Scheduled Replacement 10,000 $
WWTP Furnace 2037 3 - Long Term Scheduled Replacement 8,000 $
MLS Raw Wastewater Pumps 2038 3 - Long Term Replace Worn Out Equipment 100,000$
MLS MLS Generato r 2038 3 - Long Term Replace Worn Out Equipment 67,250$
WWTP Disinfection Equipment 2039 3 - Long Term Replace Worn Out Equipment 280,000$
WWTP WAS Pump - Tuthill HD120IA1PC0B1BA000 - Concentrator Solids Pump 2040 3 - Long Term Replace Worn Out Equipment 16,700$
WWTP Disc Aerators 2040 3 - Long Term Replace Worn Out Equipment 150,000$
WWTP Grit chamber equipment 2040 3 - Long Term Scheduled Replacement 57,600 $
WWTP Grit Classifier equipment 2040 3 - Long Term Scheduled Replacement 41,272 $
WWTP Grit equipment paintin g & coating 2040 3 - Long Term Scheduled Replacement 20,250 $
WWTP Catwalk Repaint/Replace 2040 2 - Near Term Replace Worn Out Equipment 255,000$
WWTP Driveway Asphalt - remove and replace 2045 4 - Future Scheduled Replacement 252,540$
WWTP Floorin g Replacement in Service Building 2045 4 - Future Scheduled Replacement 8,829 $
WWTP Pretreatment Buildin g Roof Replacement 2045 4 - Future Scheduled Replacement 7,460$
WWTP Service Buildin g Roof Replacement 2045 4 - Future Scheduled Replacement 46,160 $
WWTP Solids Buildin g Roof Replacement 2045 4 - Future Scheduled Replacement 8,350$
WWTP Septa ge Receiving/Flow Equalization Tank 2045 4 - Future Scheduled Replacement 38,797 $
WWTP Aeration Tan k 2045 4 - Future Scheduled Replacement 245,000$
WWTP Secondary Clarifier Tan k 2045 4 - Future Scheduled Replacement 110,282$
WWTP Secondary Clarifier No. 1 Roof Gel Coatin g 2045 4 - Future Scheduled Replacement 10,625 $
WWTP RAS Pump Motor Replacement 2045 4 - Future Scheduled Replacement 31,600 $
WWTP NPW Pump Replacement 2045 4 - Future Scheduled Replacement 10,019 $
WWTP Slud ge Blowers 2037 4 - Future Scheduled Replacement 16,000 $
WWTP Pumper Truck/Slud ge Truck - 1991 2031 3 - Long Term Replace Worn Out Equipment 95,000$
WWTP UV Disinfection System 2045 4 - Future Scheduled Replacement 233,989$
WWTP Huber Slud ge Thickener 2045 4 - Future Scheduled Replacement 199,713$
WWTP New Course Bubble Aeration System Work for Slud ge Storage Tank 2045 4 - Future Scheduled Replacement 41,559 $
WWTP Recoatin g of the Existing Exterior Piping 2045 4 - Future Scheduled Replacement 9,848 $
MLS Fuel Stora ge Tank 2050 3 - Long Term Replace Worn Out Equipment 34,000$
WWTP Sewa ge Ejectors 2050 3 - Long Term Replace Worn Out Equipment 20,300$
Budget Funding Totals 2,737,545$
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
CAPITAL EXPENDITURE PLANNING
BEYOND 5-YEAR PERIOD
PROGRAM/PROJECT
93
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
SUMMARY OF FUNDS
2027 2028 2029 2030 2031 Total
EST. BEGINNING FUND BALANCE 375,763$ 375,763 $ 375,763 $ 375,763 $ 369,763 $
FUNDING SOURCES
CAPITAL PROJECTS LEVY -$ - $ - $ - $ - $ - $
GENERAL FUND LEVY -$ - $ - $ - $ - $ - $
BOND PROCEEDS -$ - $ - $ - $ - $ - $
GRANTS -$ - $ - $ - $ - $ - $
PREMIER RESORT AREA TAX -$ - $ - $ - $ - $ - $
OTHER SOURCE 1,536,000$ 700,000 $ 22,000 $ 6,000 $ - $ 2,264,000$
TOTAL SOURCES 1,536,000$ 700,000 $ 22,000 $ 6,000 $ - $ 2,264,000$
TOTAL AVAILABLE FUNDS 1,911,763$ 1,075,763 $ 397,763 $ 381,763 $ 369,763 $
USES BY CATEGORY
Collection 1,536,000 $ 700,000 $ 22,000 $ 6,000 $ - $ 2,264,000$
TOTAL USES BY CATEGORY 1,536,000$ 700,000 $ 22,000 $ 6,000 $ - $ 2,264,000$
EST. ENDING FUND BALANCE 375,763$ 375,763 $ 375,763 $ 375,763 $ 369,763 $
8/27/2026
94
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
2027 2028 2029 2030 2031 Total
EST. BEGINNING FUND BALANCE 375,763$ 375,763$ 375,763$ 375,763$ 369,763$
FUNDING SOURCES
CAPITAL PROJECTS LEVY -$ -$ -$ -$ -$ -$
GENERAL FUND LEVY -$ -$ -$ -$ -$ -$
BOND PROCEEDS -$ -$ -$ -$ -$ -$
GRANTS -$ -$ -$ -$ -$ -$
PREMIER RESORT AREA TAX -$ -$ -$ -$ -$ -$
OTHER SOURCE 1,536,000$ 700,000 $ 22,000$ 6,000$ -$ 2,264,000$
TOTAL SOURCES 1,536,000$ 700,000 $ 2,264,000$
TOTAL AVAILABLE FUNDS 1,911,763$ 1,075,763 $ 397,763 $ 375,763 $ 369,763 $
USES BY PROGRAM/PROJECT
Sanitary Sewer Camera CL-27-01 16,000 $ - $ - $ - $ - $ 16,000$
HWY 57 Sanitary Sewer Extension CL-27-02 1,500,000 $ - $ - $ - $ - $ 1,500,000$
Little Sister Lift Station Pumps CL-27-03 20,000 $ - $ - $ - $ - $ 20,000$
Fieldcrest Lift Station Upgrade CL-28-01 -$ 700,000$ -$ -$ -$ 700,000$
Submersible Sewer Pump CL-29-01 -$ -$ 22,000$ -$ -$ 22,000$
2020 Truck Replacement CL-30-01 -$ -$ -$ 6,000$ -$ 6,000$
TOTAL USES BY PROJECT 1,536,000$ 700,000 $ 22,000$ 6,000$ -$ 2,264,000$
EST. ENDING FUND BALANCE 375,763$ 375,763 $ 375,763 $ 369,763 $ 369,763 $
Collection
8/27/2026
95
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Sanitary Sewer Camera 16,000 $ 16,000$
Total 16,000 $ - $ - $ -$ -$ 16,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Other Source 16,000 $ 16,000$
Total 16,000 $ - $ - $ -$ -$ 16,000$
Budget Impact/Other
10 Years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
Collection Collection
Sanitary Sewer Camera Megan Barnes
CL-27-01 Equipment
Operating funds, new addition to tools. Capital improvement?
2 -Improvement Benefit/Desired Want/2-3 Years
Improve Policies/Procedures
small Ridgid See Snake sewer camera. Would be helpful to have a camera to find I/I issues during flow times, otherwise we have to rely on coordinating a
contractor at those times, which they do not always have availability for those quick inspections.
Would help us track down small issues or I/I during those high flow times (would help us find illicit storm sewer hook ups) in the sanitary sewer system
faster without always having to call an outside contractor to televise something for us.
96
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
HWY 57 Sanitary Sewer Extension 1,500,000$ 1,500,000$
Total 1,500,000$ - $ - $ - $ - $ 1,500,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Other Source 1,500,000$ 1,500,000$
Total 1,500,000$ - $ -$ -$ -$ 1,500,000$
Budget Impact/Other
Megan Barnes
Equipment
New infrastracture cost cannot come out from replacement funds-capital contribution. OPC for erosion control, restoration split between Water and Collection
($226,300 estimated total, Collection side to fund $113,150). Sanitary Sewer pipe and appertuences estimate is $275,050 (gravity sanitary sewer, forcemain,
laterals, and manholes) Lift station also required as part of extension. Collection fund contribute $390,000 Two option/estimates for lift station: Option 1 Above grade
pump moveable pump enclosure (moveable enclosure, can move down the line if another extension is completed on HWY 57 further south. Option 2: Above grade
fixed building pump enclosure. Option 1 opinion of probable cost is $683,445. Option 2 opinion of probable cost is $1,104,345. Depending on lift station selection,
project expense for Collection fund would be either $1,090,000 or $1,500,000. Plan for largest expense, but lift station option must be selected.
1 -Maintain/Public Want/Greater than 3 Years
Expanded Service
Extend sanitary sewer service to the Deviley property. Extend sanitary sewer main as well as service laterals to the Deviley property, and to the patio property and
continue extension to Northwoods Dr by the Veterinary Clinic.
Public desire/infrastructure install desired prior to HWY 57 trail install.
20 years
HWY 57 Sanitary Sewer Extension
CL-27-02
VILLAGE OF SISTER BA
Y
CAPITAL IMPROVEMENT PLAN
2027-2031
CollectionCollections
97
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Note: Program/Project Name and # Referenced on Category Sheet. Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Little Sister Lift Station Pumps 20,000$ - $ - $ - $ - $ 20,000$
Total 20,000$ - $ - $ - $ - $ 20,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Other Source 20,000$ -$ -$ -$ -$ 20,000$
Total 20,000$ -$ -$ -$ -$ 20,000$
Budget Impact/Other
Megan Barnes
Equipment
Financial impact to budget of $0. Remaining source of funds from collection replacement funds - $20,000.
1 -Maintain/Public Want/Greater than 3 Years
Scheduled Replacement
Smith and Loveless 4B3B 300GPM, 20hp pump. Two pumps for Lift Station and each cost $10,000
The pumps are about 25 years old and the normal life is about 15 years. There are two pumps but they are a different kind compared to the smaller submersible lift stations.
15 years
Little Sister Lift Station Pumps
CL-27-03
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
CollectionCollection
8/27/2026
98
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Fieldcrest Lift Station Upgrade -$ 700,000$ - $ - $ - $ 700,000$
Total -$ 700,000$ - $ - $ - $ 700,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Other Source -$ 700,000$ - $ -$ -$ 700,000$
Total -$ 700,000$ - $ -$ -$ 700,000$
Budget Impact/Other
Utility Director
Equipment
ASK: if this can be from replacement since it’s a current lift, or since the setup would change is it a capital improvement? If so, Financial impact to budget of $0. Remaining source of funds
from collection replacement funds - $700,000.
1 -Maintain/Public Want/Greater than 3 Years
Improve Policies/Procedures
Change out the lift station to a above grade pump enclosure, similar to the proposed lift station for the HWY 57 extension (waters end, sunny court, pheasant park, and admiral drive).
Replace pumps and change pump housing/enclosure from the current vacuum pump setup
This is one of our larger lift stations and the vaccum style lift has worked but the can style lift stations are hard to maintain, replace equipment. An above grade enclosure would work best
in this application.
15 years
Fieldcrest Lift Station Upgrade
CL-28-01
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
CollectionCollection
8/27/2026
99
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Submersible Sewer Pump -$ - $ 22,000$ - $ - $ 22,000$
Total -$ - $ 22,000$ - $ - $ 22,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Other Source -$ -$ 22,000$ -$ -$ 22,000$
Total -$ -$ 22,000$ -$ -$ 22,000$
Budget Impact/Other
Utility Director
Equipment
Financial impact to budget of $0. Remaining source of funds from collection replacement funds - $22,000.
2 -Improvement Benefit/Desired Want/2-3 Years
Scheduled Replacement
Replacement of Goulds 4" submersible sewage pump (2 ea) WELS.
Scheduled Replacement
10 years
Submersible Sewer Pump
CL-29-01
VILLAGE OF SISTER BA
Y
CAPITAL IMPROVEMENT PLAN
2027-2031
CollectionCollection
8/27/2026
100
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
2020 Truck Replacement -$ - $ - $ 6,000$ - $ 6,000$
Total -$ - $ - $ 6,000$ - $ 6,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Other Source -$ -$ -$ 6,000$ -$ 6,000$
Total -$ -$ -$ 6,000$ -$ 6,000$
Budget Impact/Other
Megan Holzem
Vehicle
Financial impact to budget of $0. Remaining source of funds from collection replacement funds - $6,000.
2 -Improvement Benefit/Desired Want/2-3 Years
Scheduled Replacement
Replace the 2020 Chevy Silverado 2500 with a truck of similar size. Amount below is for this fund's portion of the truck only. Total cost of the truck is $75,000. Trade in 2020 or sell and
use funds to offset purchase price.
Scheduled Replacement
10 years
2020 Truck Replacement
CL-30-01
VILLAGE OF SISTER BA
Y
CAPITAL IMPROVEMENT PLAN
2027-2031
CollectionCollection
8/27/2026
101
PROGRAM/ 2027 2027 2027
CATEGORY PROGRAM/PROJEC T PROJECT # PRIORITY PURPOSE Requested Defunded A pproved
Collection Sanitary Sewer Camera CL-27-01 2 -Improvement Benefit/Desired Want/2-3 Years Im prove Policies/Procedures 16,000$
Collection HWY 57 Sanitary Sewer Extension CL-27-02 1 -Maintain/Public Want/Greater than 3 Years Ex panded Service 1,500,000$
Collection Little Sister Lift Station Pumps CL-27-03 1 -Maintain/Public Want/Greater than 3 Years Scheduled Re placement 20,000$
Collection Fieldcrest Lift Station Upgrade CL-28-01 1 -Maintain/Public Want/Greater than 3 Years Im prove Policies/Procedures -$
Collection Submersible Sewer Pump CL-29-01 2 -Improvement Benefit/Desired Want/2-3 Years Scheduled Replacement -$
Collection 2020 Truck Replacement CL-30-01 2 -Improvement Benefit/Desired Want/2-3 Years Scheduled Re placement -$
Budget Funding Totals 20,000$ - $ - $
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031 RECOMMENDED BUDGET
2027 CAPITAL EXPENDITURES
102
YEAR RANKING Estimated
CATEGORY PLANNED CRITERIA PURPOSE Cost
Collection Pum ps - Gorman Rupp -XV6460-B - 1000GPM 2034 4 - Future Scheduled Replacement 5,000$
Collection Pum ps - Gorman Rupp -XV63B60-B - 300GPM 2034 4 - Future Scheduled Replacement 5,000$
Collection Control Panels for all six (6) Lift Stations 2040 4 - Future Scheduled Replacement 130,800$
Budget Funding Totals 140,800 $
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
CAPITAL EXPENDITURE PLANNING
BEYOND 5-YEAR PERIOD
PROGRAM/PROJECT
103
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
SUMMARY OF FUNDS
2027 2028 2029 2030 2031 Total
EST. BEGINNING FUND BALANCE 742,562.00$ 742,562.00 $ 742,562.00 $ 742,562.00 $ 742,562.00 $
FUNDING SOURCES
CAPITAL PROJECTS LEVY -$ - $ - $ - $ - $ - $
GENERAL FUND LEVY -$ - $ - $ - $ - $ - $
BOND PROCEEDS 1,000,000.00$ - $ - $ - $ - $ 1,000,000.00$
GRANTS -$ - $ - $ - $ - $ - $
PREMIER RESORT AREA TAX -$ - $ - $ - $ - $ - $
OTHER SOURCE 570,000.00$ 9,500.00 $ - $ - $ - $ 579,500.00$
TOTAL SOURCES 1,570,000$ 9,500 $ - $ - $ - $ 1,579,500.00$
TOTAL AVAILABLE FUNDS 2,312,562$ 752,062 $ 742,562 $ 742,562 $ 742,562 $
USES BY CATEGORY
Marina 1,570,000.00 $ 9,500.00 $ - $ - $ - $ 1,579,500.00$
TOTAL USES BY CATEGORY 1,570,000.00$ 9,500.00 $ - $ - $ - $ 1,579,500.00$
EST. ENDING FUND BALANCE 742,562.00$ 742,562.00 $ 742,562.00 $ 742,562.00 $ 742,562.00 $
8/27/2026
104
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
2027 2028 2029 2030 2031 Total
EST. BEGINNING FUND BALANCE 742,562$ 742,562$ 742,562$ 742,562$ 742,562$
FUNDING SOURCES
CAPITAL PROJECTS LEVY -$ -$ -$ -$ -$ -$
GENERAL FUND LEVY -$ -$ -$ -$ -$ -$
BOND PROCEEDS 1,000,000$ - $ -$ -$ -$ 1,000,000$
GRANTS -$ -$ -$ -$ -$ -$
PREMIER RESORT AREA TAX -$ -$ -$ -$ -$ -$
OTHER SOURCE 570,000$ 9,500$ -$ -$ -$ 579,500$
TOTAL SOURCES 1,570,000$ 9,500 $ -$ -$ -$ 1,579,500$
TOTAL AVAILABLE FUNDS 2,312,562$ 752,062 $ 742,562 $ 742,562 $ 742,562 $
USES BY PROGRAM/PROJECT
Marina Building Reconstruction MARINA-27-01 1,260,000$ - $ - $ - $ - $ 1,260,000$
Boardwalk/E Dock MARINA-27-02 250,000 $ - $ - $ - $ - $ 250,000$
Vendor Tables MARINA-27-03 10,000 $ - $ - $ - $ - $ 10,000$
Launch Ramp Piers MARINA-27-04 50,000 $ - $ - $ - $ - $ 50,000$
2008 Club Car Carryall Replacement MARINA-28-01 - $ 9,500$ - $ - $ - $ 9,500$
B Dock Finger Piers MARINA-31-01 -$ -$ -$ -$ -$ -$
TOTAL USES BY PROJECT 1,570,000$ 9,500 $ -$ -$ -$ 1,579,500$
EST. ENDING FUND BALANCE 742,562$ 742,562 $ 742,562 $ 742,562 $ 742,562 $
Marina
8/27/2026
105
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Note: Program/Project Name and # Referenced on Category Sheet. Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Marina Building Reconstruction 1,260,000$ - $ - $ - $ - $ 1,260,000$
Total 1,260,000$ - $ - $ - $ - $ 1,260,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Bond Proceeds 1,000,000$ - $ -$ -$ -$ 1,000,000$
Other Source 260,000$ -$ -$ -$ -$ 260,000$
Total 1,260,000$ - $ -$ -$ -$ 1,260,000$
Budget Impact/Other
Dave Lienau
Marina
General obligation bonds totaling $1,000,000 supported with revenues of the marina but backed by the financing of the Village for the remodel. $100,000 for temporary office space during
construction. $100,000 for demolition. $60,000 to repave the parking lot after construction.
2 -Improvement Benefit/Desired Want/2-3 Years
New Program/Service
Remodel of the marina office to include improved boaters lounge, restrooms, marina office and office space, employee only area.. Need a work room or shop to perform repairs. Improved
laundry space.
Lounge is inadequate in comparison to other marinas. Restrooms would be expanded. Marina office space and private office space is not currently available. Better electrical, plumbing and
IT. No current employee area for breaks or meetings or anything.
40 years
Marina Building Reconstruction
MARINA-27-01
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
MarinaMarina
8/27/2026
106
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Boardwalk/E Dock 250,000$ - $ - $ - $ - $ 250,000$
Total 250,000$ - $ - $ - $ - $ 500,000$
Fundin
g Sources 2027 2028 2029 2030 2031 Total
Other Source 250,000$ - $ -$ -$ -$ 250,000$
Total 250,000$ - $ -$ -$ -$ 500,000$
Budget Impact/Other
15 years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
Marina
Marina Manager
Marina
Marina
Boardwalk/E Dock
MARINA-27-02
Financial Impact to budget of $0. Remaining source of funds for $250,000 from Marina reserve funds/capital funds.
5 -Mandated/Mission Driven/Immediate Need
Replace Worn Out Equipment
Boardwalk was created in 2011 and is primarily a wooden boardwalk. Repair or replace the boardwalk. Working on solutions for replacement. Cost estimate below is a placeholder based
on a prior estimate for repair. Current tentative plans are for steel sheeting/steel base with a concrete top.
The boards are rapidly deteriorating. Work is being done by staff to prolong use of current boardwalk but the boards are in such bad shape that they cannot be screwed into. Deteriorating
faster than we thought. People walking over have been able to put a foot through the boards.
8/27/2026
107
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Vendor Tables 10,000$ - $ - $ - $ - $ 10,000$
Total 10,000$ - $ - $ - $ - $ 10,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Other Source 10,000$ -$ -$ -$ -$ 10,000$
Total 10,000$ -$ -$ -$ -$ 10,000$
Budget Impact/Other
40 years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
Marina Marina
Vendor Tables Marina Manager
MARINA-27-03 Marina
Financial impact to budget of $0. Planed to be paid by Marina's reserves.
2 -Improvement Benefit/Desired Want/2-3 Years
New Program/Service
Addition of Vendor Tables.
8/27/2026
108
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
Launch Ramp Piers 50,000$ - $ - $ - $ - $ 50,000$
Total 50,000$ - $ - $ - $ - $ 50,000$
Funding Sources 2027 2028 2029 2030 2031 Total
Other Source 50,000$ -$ -$ -$ -$ 50,000$
Total 50,000$ -$ -$ -$ -$ 50,000$
Budget Impact/Other
15 years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
Marina
Dave Lienau
Marina
Marina
Launch Ramp Piers
MARINA-27-04
Financial Impact to budget of $0. Remaining source of funds for $50,000 from Marina reserve funds.
3 -Preventive Need/Public Benefit/1-2 Years
Scheduled Replacement
Launch ramp dock is made of 3 piers. Center pier and the two on the sides. Also realign south dock that also serves as C46 to allow for more space between end of dock and the C dock
next to it. Purchase new and install.
Condition of the piers is deteriorating. Floatation material under the docks is eroding. Surface is also in rough shape. Sheeting is failing which is causing water to get in and ruin the
floatation material.
8/27/2026
109
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2030 2031 Total
2008 Club Car Carryall Replacement -$ 9,500$ - $ - $ - $ 9,500$
Total -$ 9,500$ - $ - $ - $ 9,500$
Funding Sources 2027 2028 2029 2030 2031 Total
Other Source -$ 9,500$ -$ -$ -$ 9,500$
Total -$ 9,500$ -$ -$ -$ 9,500$
Budget Impact/Other
15 years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
Marina
Marina Manager
Marina
2008 Club Car Carryall Replacement
MARINA-28-01
Marina
Financial Impact to budget of $0. Remaining source of funds for $9,500 from Marina reserve funds.
1 -Maintain/Public Want/Greater than 3 Years
Scheduled Replacement
Replace the 2008 Club Car Carryall with similar equipment
Scheduled replacement
8/27/2026
110
Category: Department:
Program/Project Name: Contact:
Program/Project #: Type:
Useful Life:
Note: Program/Project Name and # Referenced on Category Sheet. Priority:
Purpose:
Description
Justification
Expenditures (Uses) 2027 2028 2029 2031 Total
B Dock Finger Piers -$ -$ -$ -$ -$
Total -$ -$ -$ -$ -$
Funding Sources 2027 2028 2029 2031 Total
Other Source -$ -$ -$ -$ -$
Total -$ -$ -$ -$ -$
Budget Impact/Othe
r
20 years
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027-2031
PROJECT OR PROGRAM / DESCRIPTION & JUSTIFICATION
Marina Marina
B Dock Finger Piers Marina Manager
MARINA-31-01 Equipment
Financial Impact to budget of $8,000. The project would be included in dock maintenance in the budget and paid for with revenues from the marina.
3 -Preventive Need/Public Benefit/1-2 Years
Replace Worn Out Equipment
Replace decking on finger piers. Replace rub rails. Flip finger piers over and remove metal sheeting. Remove all foam. Install new floatation devices and fix structure to
stiffen piers. Work can be done by existing staff during the off season. Will be a maintenance item in the expense budget.
Existing piers are deteriorating but are not as bad as C dock. Stability of piers is deteriorating. Sheet metal under piers is peeling away because screws/nails have
rusted away. Foam floatation is deteriorating. Decking is worn. Rub rails are worn.
8/27/2026
111
PROGRAM/ 2027 2027 2027
CATEGORY PROGRAM/PROJEC T PROJECT # PRIORITY PURPOSE Requested Defunded A pproved
Marina Marina Building Reconstruction MARINA-27-01 2 -Improvement Benefit/Desired Want/2-3 Years New Pro gram/Service 1,260,000$
Marina Boardwalk/E Dock MARINA-27-02 5 -Mandated/Mission Driven/Immediate Need Re place Worn Out Equipment 250,000$
Marina Vendor Tables MARINA-27-03 2 -Improvement Benefit/Desired Want/2-3 Years New Pro gram/Service 10,000$
Marina Launch Ramp Piers MARINA-27-04 3 -Preventive Need/Public Benefit/1-2 Years Scheduled Re placement 50,000$
Marina 2008 Club Car Carryall Replacement MARINA-28-01 1 -Maintain/Public Want/Greater than 3 Years Scheduled Re placement -$
Marina B Dock Finger Piers MARINA-31-01 3 -Preventive Need/Public Benefit/1-2 Years Re place Worn Out Equipment -$
Budget Funding Totals 1,570,000$ - $ - $
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
2027 RECOMMENDED BUDGET
CAPITAL EXPENDITURES
112
YEAR RANKING Estimated
CATEGORY PLANNED CRITERIA PURPOSE Cost
Marina J Dock Fin ger Piers - 32 ft (6) 2032 3 - Long Term Scheduled Replacement 25,000 $
Marina J Dock Fin ger Piers - 40 ft (6) 2032 3 - Long Term Scheduled Replacement 35,000 $
Marina 2013 Club Car golf cart - purchased 2018 2033 3 - Long Term Increase Safety 6,500 $
Marina D Dock Main Pier - fixed - 4620 sq f t 2035 4 - Future Replace Worn Out Equipment 75,000$
Marina D Dock Fin ger Piers - 40 ft (9) 2035 4 - Future Replace Worn Out Equipment 23,600$
Marina D Dock Fin ger Piers - 50 ft (1) 2035 4 - Future Replace Worn Out Equipment 18,000$
Marina D Dock Fin ger Piers - 60 ft (2) 2035 4 - Future Replace Worn Out Equipment 22,000$
Marina D Dock Fin ger Piers - 90 ft (1) 2035 4 - Future Replace Worn Out Equipment 10,625$
Marina A Dock breakwate r 2060 4 - Future Scheduled Replacement 1,500,000$
Marina J Dock Breakwall 2060 4 - Future Scheduled Replacement 1,200,000$
Budget Funding Totals 2,915,725$
PROGRAM/PROJECT
VILLAGE OF SISTER BAY
CAPITAL IMPROVEMENT PLAN
CAPITAL EXPENDITURE PLANNING
BEYOND 5-YEAR PERIOD
113
Page 1
STAFF REPORT
Date: August 31, 2026
To: Finance Committee
Re: 2027 Annual Budget Review
Author(s): Benjamin Andrews, Village Administrator
INTRODUCTION
This Staff Report provides a concise overview of the Proposed 2027 Village Budget, including
major revenue and expenditure changes, fund performance, capital priorities, and the projected
tax rate. The budget reflects the Village’s ongoing commitment to fi scal sustainability while
supporting capital investments, services, and strategic priorities for 2027.
WHAT IS A BUDGET?
• A budget is a policy document setting the Village’s priorities.
• Its purpose is to appropriate resources to various programs, services, and projects, based
upon the Village’s priorities.
• It is a financial plan that forecasts the anticipated revenues and expenditures for a specific
period.
• It provides transparency for the public and accountability for elected and appointed officials.
SUMMARY OF BUDGET PROCESS
The 2027 Budget follows the required annual process:
• Department budget requests were submitted and reviewed by Administration and
Finance staff.
• A draft budget was prepared and reviewed with committees and department heads.
• The Finance Committee reviews the consolidated proposed budget and recommends
adoption to the Village Board.
• A public hearing will be held prior to final adoption in November 2026.
114
Page 2
Strategic Priorities for 2027
Key organizational and community initiatives guiding the 2027 budget include:
• Development and adoption of the Village’s first comprehensive Strategic Plan.
• Infrastructure improvements.
• Planning and initial work on new municipal building projects.
• Expansion of support for housing development.
• Technology upgrades and digital records improvements.
• Strengthening regional partnerships for shared services.
2027 TOTAL VILLAGE BUDGET OVERVIEW
TOTAL REVENUES
2026 2027 $
Budget Budget Change
Revenues
TAXES
4,830,419
4,865,608
35,189
INTERGOVERNMENTAL REVENUES
1,280,680
1,196,507
(84,173)
LICENSES AND PERMITS
260,125
228,400
(31,725)
FINES, FORFEITURES, AND PENALTIES
2,500
9,000
6,500
PUBLIC CHARGES
39,700
82,400
42,700
MISCELLANEOUS REVENUES
1,033,378
1,285,488 252,110
DEBT PROCEEDS
5,550,000
1,000,000
(4,550,000)
GENERAL FUND - OTHER FINANCING SOURCES
1,673,595
1,029,975
(643,620)
Total Revenues
14,670,397
9,697,378
(4,973,019)
115
Page 3
2027 Proposed Revenues: $9,697,378
Change from 2026:–$4,973,019 (–34%)
The decrease is primarily due to reduced debt proceeds compared to major borrowings in 2026.
Notable category changes:
• Taxes: ↑ $35,189 (+1%)
• Intergovernmental revenues: ↓ $84,173 (–7%)
• Licenses & permits: ↓ 12%
• Public charges: ↑ 108%
• Miscellaneous revenue: ↑ 24%
• Debt proceeds: ↓ 82%
50.17%
12.34%
2.36%
0.09%
0.85%
13.26%
10.31%
10.62%
2027 Overall Proposed Village Revenues
TAXES
INTERGOVERNMENTAL REVENUES
LICENSES AND PERMITS
FINES, FORFEITURES, AND
PENALTIES
PUBLIC CHARGES
MISCELLANEOUS REVENUES
DEBT PROCEEDS
GENERAL FUND - OTHER
FINANCING SOURCES
116
Page 4
TOTAL EXPENDITURES
2026 2027 $
Budget Budget Change
Expenditures
GENERAL GOVERNMENT
991,888
800,779 (191,109)
PUBLIC SAFETY
222,900
233,180 10,280
PUBLIC WORKS
885,931
806,629 (79,302)
HEALTH & HUMAN SERVICES
9,854
17,854 8,000
CULTURE & RECREATION
565,163
602,300 37,137
CONSERVATION & DEVELOPMENT
269,075
295,751 26,676
CAPITAL OUTLAY
8,973,154
6,258,061 (2,715,093)
DEBT SERVICE
1,688,866
1,505,752 (183,114)
OTHER FINANCING USES
-
- -
13,606,83
1
10,520,30
6 (2,826,394)
7.61%
2.22%
7.67% 0.17%
5.73%
2.81%
59.49%
14.31%
0.00%
2027 Overall Proposed Village Expenditures
GENERAL GOVERNMENT
PUBLIC SAFETY
PUBLIC WORKS
HEALTH & HUMAN SERVICES
CULTURE & RECREATION
CONSERVATION & DEVELOPMENT
CAPITAL OUTLAY
DEBT SERVICE
OTHER FINANCING USES
117
Page 5
2027 Proposed Expenditures: $10,520,306
Change from 2026:–$3,086,525 (–23%)
Key departmental changes:
• General Government:–19%
• Public Safety: +5%
• Public Works:–9%
• Culture & Recreation: +7%
• Conservation & Development: +10%
• Capital Outlay:–30%
• Debt Service:–11%
GENERAL FUND REVENUES
2026 2027 $ %
Budget Budget Change Change
Revenues
TAXES
2,678,783
2,693,895
15,112 0.56%
INTERGOVERNMENTAL
REVENUES
235,126
287,483
52,356 22.27%
LICENSES & PERMITS
258,146
228,400
(29,746) -11.52%
FINES, FORFEITURES, &
PENALTIES
10,000
9,000
(1,000) -10.00%
PUBLIC CHARGES
30,768
82,400
51,632 167.81%
MISCELLANEOUS REVENUES
211,269
326,065
114,796 54.34%
OTHER FINANCING SOURCES
403,943
240,000
(163,943) -40.59%
APPLIED FUND BALANCE
-
-
- 0.00%
APPLIED COMMITTED FUNDS
-
-
- 0.00%
Total Revenues
3,828,035
3,867,243
39,208 1.02%
118
Page 6
2027 Total GF Revenues: $3,867,243
Increase of $39,208 (+1.02%) over 2026.
Significant changes:
• Intergovernmental revenues: ↑ 22%
• Public charges: ↑ 168%
• Miscellaneous revenues: ↑ 54%
• Licenses & permits: ↓ 12%
• Other financing sources: ↓ 40%
69.66%
7.43%
5.91%
0.23%
2.13% 8.43%
6.21%
0.00% 0.00%
2027 General Fund Revenues
TAXES
INTERGOVERNMENTAL REVENUES
LICENSES & PERMITS
FINES, FORFEITURES, & PENALTIES
PUBLIC CHARGES
MISCELLANEOUS REVENUES
OTHER FINANCING SOURCES
APPLIED FUND BALANCE
APPLIED COMMITTED FUNDS
119
Page 7
GENERAL FUND EXPENDITURES
2026 2027 $ %
Budget Budget Change Change
Expenditures
GENERAL GOVERNMENT
653,672
800,779
147,106 22.50%
PUBLIC SAFETY
204,502
233,180
28,678 14.02%
PUBLIC WORKS
745,675
806,629
60,954 8.17%
HEALTH & HUMAN SERVICES
9,727
17,854
8,127 83.55%
OTHER CULTURE & RECREATION
410,145
545,658
135,513 33.04%
DEVELOPMENT
298,057
295,751
(2,306) -0.77%
TRANSFERS
1,458,172
1,052,000
(406,172) -27.85%
Total Expenditures
3,779,952
3,751,851
(28,101) -0.74%
21.34%
6.22%
21.50%
0.48%
14.54%
7.88%
28.04%
2027 General Fund Expenditures
GENERAL GOVERNMENT
PUBLIC SAFETY
PUBLIC WORKS
HEALTH & HUMAN SERVICES
OTHER CULTURE & RECREATION
DEVELOPMENT
TRANSFERS
120
Page 8
2027 GF Expenditures: $3,751,851
Decrease of $28,101 (–0.74%).
Category highlights:
• General Government: ↑ 22.5%
• Public Safety: ↑ 14%
• Public Works: ↑ 8%
• Culture & Recreation: ↑ 33%
• Transfers: ↓ 28%
TAX LEVY & MILL RATE
2026 Levy 2025 Levy 2024 Levy
Village Tax Levy
Breakdown 2027 Budget 2026 Budget 2025 Budget
General Fund $ 1,628,243 $ 2,007,523 $ 1,506,241
Debt Service Fund $ 790,000 $ 790,000 $ 790,000
Capital Projects Fund $ 1,000,000 $ 620,720 $ 1,114,000
Tax Increment Districts $ 456,071 $ 593,144 $ 802,269
TOTAL Tax Levy $ 3,874,314 $ 4,011,387 $ 4,212,510
Tax Rate $ 4.63 $ 4.86 $ 5.24
Tax Rate (mill rate) is derived from a calculation based off of the assessed value and overall tax levy. It is subject to change based on the overall
assessed value of Sister Bay and the amount levied. Final tax statement includes all other taxing agencies, special charges and applicable credits.
2027 Proposed Levy: $3,874,314
Compared to:
• 2026 Levy: $4,011,387
• 2025 Levy: $4,212,510
Mill Rate: 2027 Proposed Mill Rate: $4.63 per $1,000
Decrease of $0.23 from 2026’s rate of $4.86.
This reduction reflects overall assessed value changes and reduced levy requirements.
PRAT FUND
2027 PRAT Revenues: $434,000
2027 Expenditures: $355,000 (street & stormwater projects).
DEBT SERVICE FUND
2027 debt service expenditures: $1,505,752, a decrease from 2026.
Long-term obligations reflect refinancing, broadband project debt, Wiltse property
development, and public works building financing.
121
Page 9
ENTERPRISE FUNDS (WATER, WASTEWATER, MARINA)
WATER UTILITY
2027 Revenues: $1,068,293
2027 Expenditures: $903,198
Operational cost drivers include maintenance of distribution systems, plant operations, and
administrative allocations.
WASTEWATER UTILITY
2027 wastewater revenues and expenditures increase modestly due to volume changes and
Liberty Grove flows. Debt service remains stable.
MARINA
2027 marina debt service continues, with ongoing operational stability supported by leasing and
facility revenues.
SPECIAL REVENUE FUNDS (ICE RINK, TIDS)
ICE RINK (TKH)
• Revenues remain level at $52,000.
• Expenditures decrease from $60,977 to $56,642.
• Fund balance remains positive.
TID #1 & TID #2
• TID #1 2027 Spending: $886,275
• TID #2 2027 Spending: $28,699
TIDs continue nearing closure timelines, with stable increment revenues and selective project
expenses.
SUMMARY
Overall, the proposed 2027 Village Budget represents a stable financial outlook with a reduced
tax rate, sustained service levels, and continued commitment to major capital initiatives. The
Finance Committee is encouraged to review and provide feedback.
122
Village of Sister Bay
2027 Annual Budget
Approved November X, 2026
Drafted on August 20, 2026
123
Budget Summary 2023 2024 2025 2026 2027 %
Adopted Proposed
General Fund Actual Actuals Budget Budget Change
Revenues
Property Taxes 2,247,591 2,583,823 2,620,241 2,628,243 2,628,243 0%
Other Taxes 51,416 57,854 58,542 65,463 65,652 0%
Intergovernmental Revenue 144,713 241,900 288,117 273,156 287,483 5%
Licenses & Permits 162,171 270,789 216,882 260,125 228,400 -12%
Fines, Forfeitures, and Penalties 9,161 3,214 9,296 2,500 9,000 260%
Public Charges for Services 27,419 37,510 40,337 39,700 82,400 108%
Miscellaneous Revenue 181,483 210,048 237,810 188,767 326,065 73%
Other Financing Sources 100,816 543,225 339,266 250,000 240,000 -4%
Applied Fund Balance - - - - - 0%
Total General Fund Revenues 2,924,769 3,810,491 3,707,954 3,867,243 4%
Expenditures
General Government 690,965 728,065 728,065 653,672 800,779 23%
Public Safety 185,221 199,088 199,088 204,502 233,180 14%
Public Works 753,060 751,180 751,180 745,675 806,629 8%
Health & Human Services 3,970 9,610 9,610 9,727 17,854 84%
Other Culture & Recreation 386,642 431,265 431,265 410,145 545,658 33%
Development 230,668 196,067 196,067 298,057 295,751 -1%
Transfers & Other Expenses 482,000 1,117,477 1,117,477 1,458,172 1,052,000 -28%
Total General Fund Expenditures 2,732,525 3,432,752 3,432,752 3,779,952 3,751,851 -1%
Beginning Fund Balance 1,494,210 1,686,454 2,242,064 2,619,804 2,165,959
Actual or Projected Fund Balance 1,686,454 2,242,064 2,619,804 2,165,959 2,281,351
All Village Funds
General Fund 2,628,243 1,239,000 3,867,243 3,751,851 2,921,149 3,036,541
Debt Service 790,000 737,975 1,527,975 1,505,752 (1,283,054) (1,260,831)
Capital Improvement - 2,781,390 2,781,390 3,936,087 7,115,712 5,961,015
Capital Funded by PRAT - 434,000 434,000 355,000 989,485 556,687
Tax Increment District #1 924,300 42,951 967,251 886,275 1,226,923 1,307,899
Tax Increment District #2 67,413 106 67,519 28,699 72,696 111,516
Special Revenue Funds - 52,000 52,000 56,642 62,295 57,653
Marina Proprietary Fund - 2,499,953 2,499,953 2,137,016
Water Proprietary Fund - 1,068,293 1,068,293 -
Wastewater Proprietary Fund - 1,556,828 1,556,828 1,396,689
Sewer Collection Proprietary Fund - 1,906,550 1,906,550 346,122
Village Tax Levy Breakdown 2027 2026 2025 NET INC/DEC
General Fund 1,628,243$ 2,007,523$ 1,506,241$ (379,280)$
Debt Service Fund 790,000$ 790,000$ 790,000$ -$
Capital Projects Fund 1,000,000$ 620,720$ 1,114,000$ 379,280$
Tax Increment Districts 456,071$ 593,144$ 802,269$ (137,073)$
Property Tax Levy - 2024 4,212,510 Assessed Valuation 2024 804,565,200 0.00523576
Property Tax Levy - 2025 4,011,387 Assessed Valuation 2025 826,124,200 0.00485567
Property Tax Levy - 2026 3,874,314 Assessed Valuation 2026 837,560,900 0.00462571
Base Percentage Change in Mill Rate from 2025 to 2026 -4.74%
2026 Levy 2025 Levy 2024 Levy
2027 Proposed Budget
3,948,362
Village of Sister Bay
Notice of Public Hearing - Proposed Consolidated Budget for 2027
NOTICE IS HEREBY GIVEN that on November x, 2026, at 5:30 p.m., a PUBLIC HEARING on the PROPOSED BUDGET of the Village of Sister Bay will be
held pursuant to Sec. 65.90 of the Wis. Stats. This meeting will be conducted at the Sister Bay Fire Station at 2258 Mill Rd in Sister Bay, Wisconsin,
and via video conference but is also accessible by telephone. To connect electronically or by phone, go to www.sisterbaywi.gov, click on 'Agendas &
Minutes' and scroll to the October X meeting agenda and follow the link. The proposed budget is available for inspection at the Administration
Office, 2383 Maple Dr, Sister Bay, Wisconsin, from 8:00 a.m. to 4:00 p.m., Monday through Thursday, and by appointment on Fridays from 8:00 a.m.
to noon. It is also available on our website at www.sisterbaywi.gov under 'News & Notices'.
Signed and posted this 25th day of October , 2025, by Julie Thyssen, Village Clerk.
Actual
The Village of Sister Bay is an equal opportunity provider and employer
Fund Bal. 12/31/26Property Taxes
Other Earned
Revenues Total Revenues
Total
Expenditures Fund Bal. 1/1/26
Mill Rate - 2024/2025
Mill Rate - 2025/2026
Mill Rate - 2026/2027
124
Village of Sister Bay
2027 Annual Budget
12/31/2022 12/31/2023 12/31/2024 12/31/2025 3/31/2026 6/30/2026 2026 2027
Description Actual Actual Actual Actual Actual Actual Budget Budget
Beginning Fund Balance 3,998,183 5,255,566 6,438,261 12,741,577 8,488,352 8,488,352 8,716,612 9,780,179
Revenues
TAXES 4,522,968 4,836,982 5,196,018 6,129,210 (91,724) 2,566,958 4,830,419 4,865,608
INTERGOVERNMENTAL REVENUES 453,110 608,716 269,109 340,751 421,210 528,661 1,280,680 1,196,507
LICENSES AND PERMITS 164,228 162,171 270,789 216,882 22,365 168,368 260,125 228,400
FINES, FORFEITURES, AND PENALTIES 1,793 9,161 3,214 9,296 536 646 2,500 9,000
PUBLIC CHARGES 99,869 37,792 84,214 54,328 13,683 23,371 39,700 82,400
MISCELLANEOUS REVENUES 567,414 534,789 764,516 729,119 250,904 401,768 1,033,378 1,285,488
DEBT PROCEEDS - - 7,300,000 - - - 5,550,000 1,000,000
GENERAL FUND - OTHER FINANCING SOURCES 714,939 1,032,916 1,974,452 2,405,743 194,430 388,860 1,673,595 1,029,975
Total Revenues 6,524,321 7,222,526 15,862,312 9,885,330 811,404 4,078,632 14,670,397 9,697,378
Expenditures
GENERAL GOVERNMENT 660,606 690,965 728,065 663,527 227,442 410,498 991,888 800,779
PUBLIC SAFETY 211,451 185,221 199,088 209,568 50,066 98,914 222,900 233,180
PUBLIC WORKS 636,022 753,060 751,180 789,623 165,850 376,591 885,931 806,629
HEALTH & HUMAN SERVICES 5,556 3,970 9,610 9,588 334 667 9,854 17,854
CULTURE & RECREATION 341,849 409,193 474,824 436,536 91,020 200,079 565,163 602,300
CONSERVATION & DEVELOPMENT 62,200 230,668 196,067 233,591 75,244 109,149 269,075 295,751
CAPITAL OUTLAY 2,231,576 2,144,837 5,073,134 6,112,274 692,363 895,449 8,973,154 6,258,061
DEBT SERVICE 1,176,147 1,621,917 6,380,252 5,455,588 1,295,035 1,295,035 1,688,866 1,505,752
OTHER FINANCING USES - - - - - - - -
Total Expenditures 5,325,408 6,039,831 13,812,221 13,910,295 2,597,355 3,386,383 13,606,831 10,520,306
Rounding Adjustment -4
Ending Fund Balance 5,197,092 6,438,261 8,488,352 8,716,612 6,702,401 9,180,601 9,780,179 8,957,251
5,255,566 6,438,261
Governmental Funds Summary
125
Village of Sister Bay
2027 Annual Budget
100 General Fund Summary 12/31/2022 12/31/2023 12/31/2024 12/31/2025 3/31/2026 6/30/2026 2026 2027
Description Actual Actual Actual Actual Actual Actual Budget Budget
Beginning Fund Balance 1,211,571 1,494,210 1,686,454 2,242,064 2,757,674 2,757,674 2,757,674 2,805,757
Revenues
TAXES 2,002,526 2,299,007 2,641,678 2,641,678 29 2,628,272 2,678,783 2,693,895
INTERGOVERNMENTAL REVENUES 152,610 144,713 241,900 241,900 35,613 141,518 235,126 287,483
LICENSES & PERMITS 164,228 162,171 270,789 270,789 22,365 168,368 258,146 228,400
FINES, FORFEITURES, & PENALTIES 1,793 9,161 3,214 3,214 536 646 10,000 9,000
PUBLIC CHARGES 70,194 27,419 37,510 37,510 7,023 16,711 30,768 82,400
MISCELLANEOUS REVENUES 80,887 181,483 210,048 210,048 82,926 154,590 211,269 326,065
OTHER FINANCING SOURCES 112,439 100,816 543,225 543,225 26,250 52,500 403,943 240,000
APPLIED FUND BALANCE - - - - - - - -
APPLIED COMMITTED FUNDS - - 40,000 - - - - -
Total Revenues 2,584,677 2,924,769 3,988,362 3,948,362 174,741 3,162,604 3,828,035 3,867,243
Expenditures
GENERAL GOVERNMENT 660,606 690,965 728,065 728,065 227,442 410,498 653,672 800,779
PUBLIC SAFETY 211,451 185,221 199,088 199,088 50,066 98,914 204,502 233,180
PUBLIC WORKS 636,022 753,060 751,180 751,180 165,850 376,591 745,675 806,629
HEALTH & HUMAN SERVICES 5,556 3,970 9,610 9,610 334 667 9,727 17,854
OTHER CULTURE & RECREATION 291,202 386,642 431,265 431,265 79,340 185,449 410,145 545,658
DEVELOPMENT 62,200 230,668 196,067 196,067 75,244 109,149 298,057 295,751
TRANSFERS 435,000 482,000 1,117,477 1,117,477 168,180 336,360 1,458,172 1,052,000
Total Expenditures 2,302,037 2,732,525 3,432,752 3,432,752 766,457 1,517,628 3,779,952 3,751,851
Audit Adjustment
Ending Fund Balance 1,494,211 1,686,454 2,242,064 2,757,674 2,165,959 4,402,650 2,805,757 2,921,149
Proof to Audit 1,494,210 1,686,447
126
Village of Sister Bay
2027 Annual Budget
100 General Fund Summary 12/31/2022 12/31/2023 12/31/2024 12/31/2025 3/31/2026 6/30/2026 2026 2027
Description Actual Actual Actual Actual Actual Actual Budget Budget
Fund Balance Classifications
Nonspendable 93,138 95,000 95,000 95,000 95,000 95,000 95,000 95,000
Restricted - - - - - - -
Committed - - - - - - -
Assigned - - - - - - - -
Unassigned Reserves 1,361,072 1,591,454 2,147,064 2,662,674 2,070,959 4,307,650 2,710,757 2,826,149
Total Fund Balance 1,454,210 1,686,454 2,242,064 2,757,674 2,165,959 4,402,650 2,805,757 2,921,149
Fund Balance Percentage 59.12% 58.24% 62.55% 77.57% 270.20% 283.84% 71.71% 75.33%
Amount Over/(Under) Reserve Policy 25% $785,563 $908,323 $1,288,876 $1,804,486 $1,879,345 $3,928,243 $1,765,769 $1,888,186
127
Village of Sister Bay
2027 Annual Budget
100 General Fund Summary 12/31/2022 12/31/2023 12/31/2024 12/31/2025 3/31/2026 6/30/2026 2026 2027
Description Actual Actual Actual Actual Actual Actual Budget Budget
Expenditures 12/31/2022 12/31/2023 12/31/2024 12/31/2025 3/31/2026 6/30/2026 Budget 2026 Budget 2027
Wages 469,477 600,335 687,696 687,696 206,195 396,417 985,545 521,776
Benefits & Personnel 170,832 252,316 271,743 271,743 87,002 157,381 362,022 239,602
Services 658,796 828,491 767,318 767,318 120,890 305,996 926,233 650,320
Operating & Maintenance 303,213 297,288 298,192 298,192 41,898 126,185 313,246 187,849
Non-Operating 699,719 749,321 1,405,474 1,405,474 310,092 531,650 1,424,936 241,041
Total Expenditures 2,302,037 2,727,751 3,430,423 3,430,423 766,077 1,517,628 4,011,982 1,840,588
$0
$100,000
$200,000
$300,000
$400,000
$500,000
$600,000
$700,000
$800,000
$900,000
General Fund Expenditures
Wages Benefits & Personnel
Services Operating & Maintenance
Non-Operating
128
Village of Sister Bay
2027
Annual Budget
100 General Fund Revenues 12/31/2022 12/31/2023 12/31/2024 12/31/2025 3/31/2026 6/30/2026 2026 2027
Account Description Actual Actual Actual Actual Actual Actual Budget Budget
100-41000-000-000 GENERAL FUND - TAXES
100-41110-000-000 GENERAL PROPERTY TAXES 2,001,675 2,247,591 2,583,823 2,620,241 - 2,628,243 2,628,243 2,628,243
100-41150-000-000 MANAGED FOREST LANDS 163 163 152 152 - - 163 152
100-41160-000-000 OMITTED PROPERTY (PRIOR YRS) - - - - - - - -
100-41210-000-000 ROOM TAXES 50,959 57,600 57,600 - - 65,000 65,500
100-41800-000-000 INTEREST & PENALTIES - TAXES 688 294 102 790 29 29 300 -
2,002,526 2,299,007 2,641,678 2,678,783 29 2,628,272 2,693,706 2,693,895
100-43000-000-000 GENERAL FUND - INTERGOVERNMENTAL REVENUES
100-43410-000-000 STATE SHARED REVENUE 9,036 9,036 84,955 52,626 - - 9,036 60,000
100-43411-000-000 PERSONAL PROPERTY AID 4,117 4,117 4,117 29,291 - 29,291 30,000 29,291
100-43412-000-000 EXPENDITURE RESTRAINT - - 26,028 - - - -
100-43413-000-000 SUPPLEMENTAL AID - - - 7,656 - - 52,775 8,000
100-43420-000-000 FIRE INSURANCE DUES 18,252 21,896 29,287 33,102 - 33,362 31,000 33,600
100-43430-000-000 COMPUTER AIDS 788 788 788 788 - - 788 788
100-43531-000-000 STATE AID - ROADS 113,703 102,332 107,715 123,873 35,613 71,227 142,453 148,000
100-43610-000-000 STATE AID - MUNICIPAL SERVICES - - - -
100-43650-000-000 FOREST LANDS 4 4 4 4 - 4 4 4
100-43690-000-000 STATE GRANTS - OTHER 1,661 134 7,701 6,999 - - - -
100-43790-000-000 OTHER LOCAL GOV'T GRANTS - - 539 - - - 600 -
100-43791-000-000 RECYCLING REBATE 5,049 6,406 6,792 7,751 - 7,635 6,500 7,800
152,610 144,713 241,900 288,117 35,613 141,518 273,156 287,483
100-44000-00-0000 GENERAL FUND - LICENSES AND PERMITS
100-44110-000-000 LIQUOR 14,280 23,647 17,013 16,507 (100) 15,285 18,000 16,500
100-44120-000-000 OPERATORS LICENSES 1,835 1,275 1,865 890 - 690 1,800 1,500
100-44130-000-000 SODA - - - - - - - -
100-44140-000-000 CIGARETTE 70 90 350 250 - 50 250 250
100-44210-000-000 DOG LICENSES 176 249 68 161 110 120 75 150
100-44300-000-000 BUILDING 75,310 31,010 28,633 23,500 4,730 6,798 25,000 35,000
100-44410-000-000 REZONING PETITION & FEES 19,733 30,600 31,700 34,650 2,500 9,150 20,000 25,000
100-44990-000-000 OTHER PERMITS 52,825 75,300 191,160 140,925 15,125 136,275 195,000 150,000
164,228 162,171 270,789 216,882 22,365 168,368 260,125 228,400
129
Village of Sister Bay
2027
Annual Budget
100 General Fund Revenues 12/31/2022 12/31/2023 12/31/2024 12/31/2025 3/31/2026 6/30/2026 2026 2027
Account Description Actual Actual Actual Actual Actual Actual Budget Budget
100-45000-000-000 GENERAL FUND - FINES, FORFEITS, AND PENALTIES
100-45100-000-000 COURT FINES 93 8,025 745 3,716 481 481 1,500 4,000
100-45210-000-000 CITATIONS/PKG TICKETS 1,700 1,136 2,469 5,580 55 165 1,000 5,000
1,793 9,161 3,214 9,296 536 646 2,500 9,000
100-46000-00-0000 GENERAL FUND - PUBLIC CHARGES FOR SERVICES
100-46110-000-000 ASSESSMENT LETTER FEES 3,780 2,910 2,940 2,070 120 120 3,000 2,000
100-46120-000-000 PLAN COMMISSION FEES 1,750 10,500 18,600 17,000 1,000 5,400 14,000 17,000
100-46140-000-000 PUBLISHING FEES 800 800 790 1,200 - - 1,000 1,000
100-46150-000-000 TOURISM ZONE CHARGES 35,724 - - - - - - -
100-46161-000-000 MEMORIALS 2,000 2,500 1,250 2,000 - 1,000 500 48,000
100-46190-000-000 MISC CHARGES FOR SERVICES 256 385 4,324 830 2,279 2,668 1,250 1,250
100-46310-000-000 HWY DEPT CHGS REIMB 120 - - - - - 150 150
100-46350-000-000 TRANSPORTATION CHARGES & DONATIONS11,500 - - 3,000 - - 10,000 3,000
100-46710-000-000 LIBRARY CHARGES 2,706 1,800 2,265 3,888 2,784 3,408 3,000 3,000
100-46720-000-000 PARK RENTAL 7,587 5,203 5,948 10,349 840 1,615 4,800 5,000
100-46741-000-000 FESTIVALS/EVENTS - - - - - - - -
100-46750-000-000 RECREATION CHARGES 3,971 3,321 1,392 - - 2,500 2,000 2,000
70,194 27,419 37,510 40,337 7,023 16,711 39,700 82,400
100-48000-00-0000 GENERAL FUND - MISCELLANEOUS REVENUES
100-48110-000-000 INTEREST ON INVESTMENTS 25,689 133,303 161,290 184,141 74,029 133,037 150,000 265,000
100-48210-000-000 BLDG RENTAL - POST OFFICE 18,867 17,410 17,410 17,410 4,717 11,572 18,867 20,565
100-48215-000-000 POST OFFICE REIMB - 2,036 861 956 - - 2,500 1,000
100-48220-000-000 BLDG RENTAL - VILLAGE HALL 777 1,524 1,324 1,715 395 595 1,000 1,500
100-48240-000-000 BLDG RENTAL - FIRE STATION 1,277 1,497 1,315 1,178 889 1,514 1,500 1,500
100-48250-000-000 EMS BUILDING RENTAL CHARGES 28,636 13,968 14,037 6,956 2,506 5,650 10,000 30,000
100-48260-000-000 LAND LEASES 750 850 700 500 - 1 400 400
100-48300-000-000 SALE OF PROPERTY & EQUIPMENT - 150 589 10,000 - - - -
100-48422-000-000 INSURANCE RECOVERY 4,254 6,040 2,744 5,195 - 1,595 3,000 2,500
100-48500-000-000 DONATIONS - 2,606 - 84 - 231 - -
100-48510-000-000 INTEREST ON LEASE 1,876 1,184 464 - - 1,000 600
100-48995-000-000 MISC OTHER REVENUE 637 223 8,594 9,212 390 395 500 3,000
130
Village of Sister Bay
2027
Annual Budget
100 General Fund Revenues 12/31/2022 12/31/2023 12/31/2024 12/31/2025 3/31/2026 6/30/2026 2026 2027
Account Description Actual Actual Actual Actual Actual Actual Budget Budget
80,887 181,483 210,048 237,810 82,926 154,590 188,767 326,065
100-49000-00-0000 GENERAL FUND - OTHER FINANCING SOURCES
100-49250-000-000 TRANSFERS FROM TID FUND - - 440,000 245,000 - - 145,000 145,000
100-49260-000-000 TRANSFERS FROM WATER: PILOT 59,795 55,519 57,030 52,233 13,750 27,500 55,000 55,000
100-49268-000-000 TRANSFERS FROM MARINA: PILOT 52,644 45,297 46,195 42,033 12,500 25,000 50,000 40,000
Applied Fund Balance - - - -
112,439 100,816 543,225 339,266 26,250 52,500 250,000 240,000
Total Revenues 2,584,677 2,924,769 3,948,362 3,810,491 174,741 3,162,604 3,707,954 3,867,243
131
Village of Sister Bay
2027
Annual Budget
100 General Fund Revenues 12/31/2022 12/31/2023 12/31/2024 12/31/2025 3/31/2026 6/30/2026 2026 2027
Account Description Actual Actual Actual Actual Actual Actual Budget Budget
Revenue Summary 2022 2023 2024 2025 3/31/2026 6/30/2025 2026 Budget 2027 Budget
TAXES 2,002,526 2,299,007 2,641,678 2,678,783 29 2,628,272 2,693,706 2,693,895
INTERGOVERNMENTAL REVENUE 152,610 144,713 241,900 288,117 35,613 141,518 273,156 287,483
LICENSES & PERMITS 164,228 162,171 270,789 216,882 22,365 168,368 260,125 228,400
FINES, FORFEITS & PENALTIES 1,793 9,161 3,214 9,296 536 646 2,500 9,000
PUBLIC CHARGES 70,194 27,419 37,510 40,337 7,023 16,711 39,700 82,400
MISCELLANEOUS REVENUES 80,887 181,483 210,048 237,810 82,926 154,590 188,767 326,065
OTHER FINANCING SOURCES 112,439 100,816 543,225 339,266 26,250 52,500 250,000 240,000
Total Revenues 2,584,677 2,924,769 3,948,362 3,810,491 174,741 3,162,604 3,707,954 3,867,243
132
Village of Sister Bay
2026 Annual Budget
51000 General Government 12/31/2022 12/31/2023 12/31/2024 12/31/2025 3/31/2026 6/30/2026 2026 2027
Account Description Actual Actual Actual Actual Actual Actual Budget Budget
100-51100-00-0000 LEGISLATIVE - VILLAGE BOARD
100-51100-111-000 FULL-TIME WAGES 41,488 40,675 47,863 56,675 10,625 22,113 57,000 57,000
100-51100-132-000 SOCIAL SECURITY 3,174 3,112 3,662 4,336 813 1,692 4,361 4,361
100-51100-143-000 RECOGNITION 313 297 157 411 547 1,100 500 500
100-51100-144-000 MILEAGE 28 - 42 352 54 54 100 100
100-51100-145-000 EXPENSE ALLOWANCE 50 99 - 153 - 131 250 250
100-51100-200-000 CONTRACTED SERVICES 3,060 1,110 188 188 - - - -
100-51100-310-000 COMPUTER SOFTWARE/HARDWARE 132 1,232 2,683 79 - - 4,000 4,000
100-51100-311-000 WEBSITE 533 1,348 - 23 4,400 4,400 2,000 2,000
100-51100-312-000 IT SUPPORT 2,008 1,049 1,271 1,768 - 500 2,500 2,500
100-51100-321-000 OFFICE SUPPLIES 8 628 89 90 15 15 500 500
100-51100-325-000 ADVERTISING & PUBLICATIONS 3,940 4,566 1,808 1,128 - - 2,500 2,500
100-51100-332-000 EDUCATION/TRAINING 250 305 300 148 - - 300 300
100-51100-333-000 CONFERENCES/MEETINGS - 251 500 470 - - 500 500
100-51100-512-000 WORKERS COMPENSATION 58 59 58 67 19 36 88 77
55,042 54,729 58,620 65,886 16,472 30,039 74,599 74,588
100-51300-209-000 LEGAL - LEGAL
100-51300-209-000 LEGAL 15,707 28,340 29,945 40,355 1,681 9,648 45,000 45,000
15,707 28,340 29,945 40,355 1,681 9,648 45,000 45,000
100-51410-000-000 GENERAL ADMINISTRATION - ADMINISTRATION
100-51410-111-000 FULL-TIME WAGES 56,904 103946 107,165 48,636 8,596 22,575 50,870 44,514
100-51410-112-000 FULL-TIME OVERTIME WAGES - - 2,643 2,496 - - - 1,256
100-51410-113-000 COMP TIME - ADMIN - 729 89 243 - -
100-51410-114-000 UNWORKED WAGES 17,766 22,676 20,736 28,911 60,646 100,587 176,745 12,000
100-51410-115-000 BONUSES -ADMIN - 2,325 - - - -
100-51410-131-000 RETIREMENT 4,084 8,528 8,595 3,357 892 2,108 3,305 3,583
100-51410-132-000 SOCIAL SECURITY 4,814 9,513 9,320 6,602 5,308 9,425 3,512 3,800
100-51410-133-000 HEALTH 17,560 16,231 28,512 5,054 4,679 10,997 7,073 6,294
100-51410-134-000 DENTAL 534 1,105 1,734 635 286 598 405 328
100-51410-135-000 LIFE 505 882 829 540 19 59 236 64
133
Village of Sister Bay
2026 Annual Budget
51000 General Government 12/31/2022 12/31/2023 12/31/2024 12/31/2025 3/31/2026 6/30/2026 2026 2027
Account Description Actual Actual Actual Actual Actual Actual Budget Budget
100-51410-136-000 DISABILITY 411 811 170 169 34 102 174 184
100-51410-137-000 HSA 3,813 7,392 5,302 578 1,549 3,250 1,235 970
100-51410-138-000 EAP 255 263 276 276 46 115 95 276
100-51410-140-000 VISION - 181 203 66 28 62 47 41
100-51410-142-000 RECRUITMENT/TESTING - - 1,000 17,894 - - 5,000 -
100-51410-143-000 RECOGNITION 900 900 888 1,080 111 226 900 900
100-51410-144-000 MILEAGE 282 253 226 136 - - 1,000 250
100-51410-145-000 EXPENSE ALLOWANCE 377 486 23 147 159 159 1,000 250
100-51410-190-000 OTHER PERSONNEL SERVICES 465 450 500 - - - 500 500
100-51410-200-000 OTHER CONTRACTED SERVICES 29,248 - - - 800 800 - -
100-51410-204-000 CELL PHONE 413 731 775 4 169 169 1,000 1,000
100-51410-302-000 COMPUTER EQUIPMENT 3,704 643 250 - - - 2,000 1,000
100-51410-310-000 COMPUTER SOFTWARE 1,391 2,311 2,036 3,074 404 553 1,750 1,750
100-51410-312-000 IT SUPPORT 8,639 5,631 7,034 8,340 2,070 4,170 7,000 7,000
100-51410-321-000 OFFICE SUPPLIES 2,632 2,365 532 2,469 1,435 2,761 3,000 3,000
100-51410-322-000 POSTAGE 5,059 4,574 1,420 2,867 421 681 3,300 3,300
100-51410-323-000 PUBLICATIONS/SUBSCRIPTIONS - 129 82 90 - - 300 300
100-51410-324-000 PRINTING/COPYING 6,773 8,886 6,305 5,941 1,347 2,365 6,000 6,000
100-51410-325-000 ADVERTISING & PUBLICATIONS 910 525 - - - 500 100
100-51410-326-000 OFFICE EQUIPMENT 840 - 44 211 - 414 500 500
100-51410-331-000 MEMBERSHIP DUES 1,904 2,014 2,454 3,134 4,810 4,810 4,500 3,500
100-51410-332-000 EDUCATION/TRAINING 90 289 364 99 - - 300 250
100-51410-333-000 CONFERENCES/MEETINGS - 146 - - - - 1,500 1,000
100-51410-352-000 MINOR EQUIPMENT & TOOL- ADMIN - 32 - -
100-51410-353-000 GENERAL SUPPLIES 156 101 335 11 - 36 150 150
100-51410-392-000 MISCELLANEOUS 191 190 - - 25 25 100 100
100-51410-512-000 WORKERS COMPENSATION 172 134 86 219 75 143 69 78
100-51410-520-000 Other Insurance Reimbersments - 68 136 25,000 -
100-51410-523-000 UNEMPLOYMENT COSTS - - - - - - - -
100-51410-551-000 OTHER FEES AND CHARGES 516 261 1,014 393 10 10 1,000 250
171,308 202,019 211,378 146,513 94,077 167,579 310,066 104,488
134
Village of Sister Bay
2026 Annual Budget
51000 General Government 12/31/2022 12/31/2023 12/31/2024 12/31/2025 3/31/2026 6/30/2026 2026 2027
Account Description Actual Actual Actual Actual Actual Actual Budget Budget
100-51420-000-000 GENERAL ADMINISTRATION - CLERK
100-51420-111-000 FULL-TIME WAGES 30,208 37,787 35,053 33,557 10,035 14,624 47,930 36,173
100-51420-112-000 FULL-TIME OVERTIME WAGES 1,567 3,755 4,535 4,037 - - 5,830 2,846
100-51420-113-000 COMP TIME 3,033 13 - 89 179 179 - -
100-51420-114-000 UNWORKED WAGES 120 4,176 4,913 14,863 495 733 5,500 5,500
100-51420-131-000 RETIREMENT 2,583 3,189 2,861 2,820 771 1,119 3,493 2,774
100-51420-132-000 SOCIAL SECURITY 2,881 3,573 3,156 3,722 761 1,119 3,752 2,959
100-51420-133-000 HEALTH 4,437 5,206 4,528 6,005 4,852 5,799 17,093 13,043
100-51420-134-000 DENTAL 275 394 300 280 184 220 1,184 903
100-51420-135-000 LIFE 54 61 52 62 42 50 266 160
100-51420-136-000 DISABILITY 195 321 56 88 56 66 222 143
100-51420-137-000 HSA 1,724 3,667 2,703 4,648 1,014 1,212 3,515 1,668
100-51420-138-000 EAP 128 131 138 138 23 69 47 142
100-51420-140-000 VISION - 51 39 15 24 29 150 62
100-51420-142-000 RECRUITMENT/TESTING/PHYSICALS - - - - - - - -
100-51420-143-000 RECOGNITION 450 450 450 - - - - -
100-51420-144-000 MILEAGE 459 275 66 190 61 61 125 125
100-51420-310-000 COMPUTER SOFTWARE HARDWARE 1,386 60 - - - - 500 500
100-51420-312-000 IT SUPPORT 211 215 321 342 - - 400 400
100-51420-325-000 PUBLIC NOTICES - - - 599 17 428 - -
100-51420-331-000 MEMBERSHIP DUES 65 65 65 65 65 65 200 200
100-51420-332-000 EDUCATION/TRAINING 199 279 400 450 68 567 400 400
100-51420-333-000 CONFERENCES/MEETINGS 405 255 - 229 - - 650 650
100-51420-392-000 MISCELLANEOUS - - - 20 - - - -
100-51420-512-000 WORKERS COMPENSATION 57 65 50 71 26 49 94 108
100-51420-523-000 UNEMPLOYMENT COSTS - - - - - - - -
100-51420-551-000 OTHER FEES AND CHARGES - - - 141 33 33 - -
50,438 63,990 59,686 72,431 18,704 26,421 91,351 68,756
135
Village of Sister Bay
2026 Annual Budget
51000 General Government 12/31/2022 12/31/2023 12/31/2024 12/31/2025 3/31/2026 6/30/2026 2026 2027
Account Description Actual Actual Actual Actual Actual Actual Budget Budget
100-51430-000-000 GENERAL ADMINISTRATION - ELECTIONS
100-51430-111-000 FULL-TIME WAGES 3,926 2,182 6,250 4,397 3,659 6,073 9,572 19,731
100-51430-112-000 FULL-TIME OVERTIME W 923 761 230 641 - - 2,791 949
100-51430-114-000 UNWORKED WAGES 900 143 203
100-51430-121-000 PART-TIME WAGES 4,675 2,568 4,438 2,445 216 1,956 2,530 2,660
100-51430-122-000 PART-TIME OVERTIME W 345 178 405 - - - - -
100-51430-131-000 RETIREMENT 356 249 538 422 274 475 661 1,513
100-51430-132-000 SOCIAL SECURITY 725 423 844 490 271 470 903 1,614
100-51430-133-000 HEALTH 824 616 1,230 1,250 1,634 2,724 3,234 7,115
100-51430-134-000 DENTAL 59 46 84 66 62 107 224 492
100-51430-135-000 LIFE 8 5 12 12 14 24 50 87
100-51430-136-000 DISABILITY 30 17 32 23 19 31 42 78
100-51430-137-000 HSA - 65 245 341 569 665 1,455
100-51430-140-000 VISION - 7 12 7 8 14 28 34
100-51430-144-000 MILEAGE 119 94 306 164 62 93 146 200
100-51430-310-000 COMPUTER SOFTWARE 1,678 1,661 8,133 1,197 - - 2,000 2,000
100-51430-321-000 OFFICE SUPPLIES 117 - 31 48 - 64 150 150
100-51430-322-000 POSTAGE 656 235 659 298 234 246 300 300
100-51430-324-000 PRINTING/COPYING 109 - 158 21 - 13 25 25
100-51430-325-000 PUBLIC NOTICES - 87 111 - - - 45 45
100-51430-332-000 EDUCATION/TRAINING - - 201 99 - 56 150 150
100-51430-333-000 CONFERENCES & MEETINGS 95 - -
100-51430-353-000 GENERAL SUPPLIES 473 657 580 293 - 163 350 400
15,023 9,786 24,319 13,115 6,938 13,280 23,866 38,998
100-51510-000-000 FINANCIAL ADMINISTRATION - Financial Specialist/TREASURER
100-51510-111-000 FULL-TIME WAGES 40,834 47,011 57,204 60,681 12,048 22,103 83,405 88,830
100-51510-112-000 Full-Time Overtime Wages - - - 6,027 6,220
100-51510-114-000 UNWORKED WAGES 5,333 10,094 23,996 3,792 613 3,168 7,812 1,000
100-51510-131-000 RETIREMENT 2,927 3,741 1,480 4,915 1,012 2,105 6,378 6,570
100-51510-132-000 SOCIAL SECURITY 2,721 3,733 2,870 4,996 982 1,993 7,318 7,323
100-51510-133-000 HEALTH 8,047 9,188 1,354 6,592 1,457 2,530 19,387 23,321
136
Village of Sister Bay
2026 Annual Budget
51000 General Government 12/31/2022 12/31/2023 12/31/2024 12/31/2025 3/31/2026 6/30/2026 2026 2027
Account Description Actual Actual Actual Actual Actual Actual Budget Budget
100-51510-134-000 DENTAL 710 727 84 404 82 140 1,201 1,575
100-51510-135-000 LIFE 55 53 3 101 14 24 122 132
100-51510-136-000 DISABILITY 288 473 (114) 251 59 103 276 337
100-51510-137-000 HSA 2,268 2,142 1,639 3,487 628 1,078 3,658 4,802
100-51510-138-000 EAP 128 131 138 138 23 69 47 138
100-51510-139-000 BENEFIT FEES - - - - - - - -
100-51510-140-000 VISION - 126 2 50 8 14 148 100
100-51510-142-000 RECRUTING - 2 - -
100-51510-143-000 RECOGNITION 450 450 450 600 - - 450 450
100-51510-144-000 MILEAGE 617 402 751 81 - - 1,000 250
100-51510-145-000 EXPENSE ALLOWANCE 250 136 91 - - - 300 100
100-51510-200-000 OTHER CONTRACTED SERVICES 2,827 2,860 4,995 17,016 2,680 4,480 20,100 20,000
100-51510-310-000 COMPUTER SOFTWARE/HARDWARE 2,837 9,144 4,594 3,907 2,125 4,993 6,550 24,757
100-51510-312-000 IT SUPPORT 331 215 321 402 120 120 750 750
100-51510-322-000 POSTAGE 952 1,083 1,129 1,332 124 234 1,200 1,200
100-51510-325-000 ADVERTISING & PUBLIC NOTICES 230 245 190 247 - - 350 350
100-51510-331-000 MEMBERSHIP DUES 746 404 489 25 - 41 900 500
100-51510-332-000 EDUCATION/TRAINING 55 295 3,298 - - - 500 250
100-51510-333-000 CONFERENCES/MEETINGS 785 1,459 2,000 175 - - 2,000 500
100-51510-392-000 MISCELLANEOUS EXPENSES 172 - - 108 - - 200 200
100-51510-512-000 WORKERS COMPENSATION 47 50 31 101 28 53 165 165
100-51510-523-000 UNEMPLOYMENT COSTS - - - - - - - -
100-51510-550-000 BANK SERVICES CHARGES & FEES 2,777 2,959 3,327 4,882 360 903 3,000 3,000
100-51510-551-000 OTHER FEES 3 - - - - - 50 50
76,389 97,121 110,323 114,284 22,361 44,152 173,294 192,870
100-51520-200-000 FINANCIAL ADMINISTRATION - PROPERTY ASSESSMENT
100-51520-200-000 PROPERTY ASSESSMENT SERVICES 28,500 28,500 28,500 28,500 12,228 24,456 48,920 48,920
28,500 28,500 28,500 28,500 12,228 24,456 48,920 48,920
137
Village of Sister Bay
2026 Annual Budget
51000 General Government 12/31/2022 12/31/2023 12/31/2024 12/31/2025 3/31/2026 6/30/2026 2026 2027
Account Description Actual Actual Actual Actual Actual Actual Budget Budget
100-51530-210-000 FINANCIAL ADMINISTRATION - AUDITING
100-51530-210-000 AUDITING & CONSULTING 13,651 15,650 41,888 20,970 9,377 14,627 30,000 25,000
13,651 15,696 41,888 20,970 9,377 14,627 30,000 25,000
100-51600-000-000 GENERAL BUILDINGS AND PLANT - GENERAL
100-51600-111-000 FULL-TIME WAGES 7,153 15,355 15,979 25,594 7,470 14,020 16,279 15,653
100-51600-112-000 FULL-TIME OVERTIME 107 484 289 584 172 222 434 1,044
100-51600-121-000 PART-TIME WAGES 1,119 109 415 2,817 1,420 2,402 152 431
100-51600-131-000 RETIREMENT 471 1,087 1,124 1,803 497 972 1,192 1,239
100-51600-132-000 SOCIAL SECURITY 586 1,142 1,209 2,116 660 1,214 1,390 1,515
100-51600-133-000 HEALTH 1,371 4,058 4,533 7,999 2,655 4,786 5,775 5,929
100-51600-134-000 DENTAL 118 291 316 473 165 297 347 368
100-51600-135-000 LIFE 9 30 17 22 7 13 28 16
100-51600-136-000 DISABILITY 39 83 55 88 28 50 62 62
100-51600-137-000 HSA 211 156 101 273 - - 1,188 1,213
100-51600-140-000 VISION - 43 48 64 19 34 39 39
100-51600-200-000 CONTRACTED SERVICES 653 2,181 2,896 1,096 1,114 1,507 3,300 5,000
100-51600-201-000 ELECTRIC/GAS 10,045 12,163 11,272 13,892 1,018 3,026 16,000 16,000
100-51600-202-000 WATER/SEWER/STORM 2,175 1,980 1,923 2,789 - 869 2,450 2,450
100-51600-203-000 PHONE 674 786 893 760 26 223 800 800
100-51600-205-000 INTERNET 2,015 2,045 2,045 2,023 540 540 2,250 2,250
100-51600-206-000 TELEVISION 40 - - - - - - -
100-51600-352-000 MINOR EQUIPMENT - - - - - - - -
100-51600-353-000 GENERAL SUPPLIES 270 210 224 331 - - 500 500
100-51600-361-000 REPAIRS & MAINTENANCE 15 509 123 26 26 500 500
100-51600-362-000 GROUNDS MAINTENANCE - 23 - - - - 500 500
100-51600-366-000 BUILDING MAINTENANCE 8,040 933 763 86 - - 2,021 2,021
100-51600-401-000 CUSTODIAL SUPPLIES 5,539 6,766 7,106 6,156 660 2,350 7,000 9,500
100-51600-510-000 PROPERTY & LIAB INSURANCE 8,076 8,813 9,065 9,266 10,357 10,357 9,729 11,500
48,725 58,738 60,783 78,355 26,836 42,909 71,936 78,530
100-51610-000-000 BUILDINGS - VILLAGE HALL
138
Village of Sister Bay
2026 Annual Budget
51000 General Government 12/31/2022 12/31/2023 12/31/2024 12/31/2025 3/31/2026 6/30/2026 2026 2027
Account Description Actual Actual Actual Actual Actual Actual Budget Budget
100-51610-200-000 OTHER CONTRACTED SERVICES - 217 - - - - 500 15,000
100-51610-201-000 ELECTRIC/GAS 7,423 6,676 2,600 2,354 277 1,081 4,000 4,000
100-51610-202-000 WATER/SEWER/STORM 2,260 2,244 2,117 2,346 - 518 2,750 2,750
100-51610-203-000 PHONE 482 480 480 280 - - 500 500
100-51610-205-000 INTERNET 1,814 1,564 1,844 1,962 549 1,114 1,850 1,850
100-51610-352-000 MINOR EQUIPMENT - - - - - - - -
100-51610-353-000 GENERAL SUPPLIES 20 - 104 13 - - 100 100
100-51610-361-000 REPAIRS AND MAINTENANCE 1,185 727 428 648 183 183 1,000 1,000
100-51610-366-000 BUILDING MAINTENANCE 3,171 3,855 288 936 - 194 3,000 3,000
100-51610-408-000 MISCELLANEOUS - - - - - - -
100-51610-599-000 LICENSE & PERMIT FEES 153 - -
16,354 15,763 7,861 8,692 1,010 3,090 13,700 28,200
100-51620-000-000 BUILDINGS - POST OFFICE
100-51620-111-000 FULL-TIME WAGES - 2,795 1,456 707 242 242 1,628 1,114
100-51620-112-000 FULL-TIME OVERTIME - 108 37 - - - - -
100-51620-121-000 PART TIME Wages - POST OFFICE 40 - 234 - - - -
100-51620-131-000 RETIREMENT - 195 103 49 17 17 119 91
100-51620-132-000 SOCIAL SECURITY - 202 104 68 17 17 139 117
100-51620-133-000 HEALTH - 914 538 281 95 95 577 474
100-51620-134-000 DENTAL - 65 37 17 6 6 35 30
100-51620-135-000 LIFE - 2 2 1 0 0 3 1
100-51620-136-000 DISABILITY - 11 6 3 1 1 6 4
100-51620-140-000 VISION - 9 6 3 1 1 4 3
100-51620-366-000 BUILDING MAINTENANCE 992 17,786 506 5,840 - - 4,000 4,000
992 22,127 2,794 7,202 380 380 6,511 5,834
100-51630-000-000 BUILDINGS - FIRE STATION
100-51630-111-000 FULL-TIME WAGES - - - - - - -
100-51630-121-000 PART-TIME WAGES - - - - - - - -
100-51630-131-000 RETIREMENT - - - - - - - -
100-51630-132-000 SOCIAL SECURITY - - - - - - - -
139
Village of Sister Bay
2026 Annual Budget
51000 General Government 12/31/2022 12/31/2023 12/31/2024 12/31/2025 3/31/2026 6/30/2026 2026 2027
Account Description Actual Actual Actual Actual Actual Actual Budget Budget
100-51630-133-000 HEALTH - - - - - - - -
100-51630-134-000 DENTAL - - - - - - - -
100-51630-135-000 LIFE - - - - - - - -
100-51630-136-000 DISABILITY - - - - - - - -
100-51630-200-000 OTHER CONTRACTED SERVICES 2,165 2,110 1,720 1,015 540 671 3,000 3,000
100-51630-201-000 ELECTRIC/GAS 32,659 33,274 22,986 24,261 8,388 16,748 35,000 35,000
100-51630-202-000 WATER/SEWER/STORM 8,667 8,884 8,599 9,422 - 2,407 10,000 10,000
100-51630-207-000 RECYCLING 728 590 689 696 781 387 750 750
100-51630-353-000 GENERAL SUPPLIES 370 239 309 238 107 171 350 350
100-51630-362-000 GROUNDS MAINTENANCE - - - 848 - 411 1,000 1,000
100-51630-366-000 BUILDING MAINTENANCE 92,052 3,683 15,000 9,084 3,626 3,626 5,000 5,000
100-51630-369-000 EQUIPMENT MAINTENANCE 14,790 24,410 22,278 1,988 651 651 18,000 10,000
100-51630-401-000 CUSTODIAL SUPPLIES 118 - - - - - 150 150
100-51630-408-000 MISCELLANEOUS - - - - - - - -
151,550 73,189 71,580 47,553 14,094 25,071 73,250 65,250
100-51640-000-000 BUILDINGS - ADMINISTRATION BUILDING
100-51640-111-000 FULL-TIME WAGES - - - - - - - -
100-51640-131-000 RETIREMENT - - - - - - - -
100-51640-132-000 SOCIAL SECURITY - - - - - - - -
100-51640-133-000 HEALTH - - - - - - - -
100-51640-134-000 DENTAL - - - - - - - -
100-51640-135-000 LIFE - - - - - - - -
100-51640-136-000 DISABILITY - - - - - - - -
100-51640-200-000 OTHER CONTRACTED SERVICES 288 864 673 739 - - 7,000 2,000
100-51640-201-000 ELECTRIC/GAS 4,729 5,699 5,111 5,294 940 3,226 5,000 5,000
100-51640-202-000 WATER/SEWER/STORM 776 832 797 906 - 285 1,000 1,000
100-51640-203-000 PHONE 1,896 3,115 2,371 2,226 195 761 2,500 2,500
100-51640-205-000 INTERNET 1,946 900 1,920 1,784 480 935 2,100 2,100
100-51640-352-000 MINOR EQUIPMENT - - - -
100-51640-353-000 GENERAL SUPPLIES 18 85 - 101 13 13 100 100
100-51640-361-000 REPAIRS & MAINTENANCE 446 94 - 387 - - 400 400
140
Village of Sister Bay
2026 Annual Budget
51000 General Government 12/31/2022 12/31/2023 12/31/2024 12/31/2025 3/31/2026 6/30/2026 2026 2027
Account Description Actual Actual Actual Actual Actual Actual Budget Budget
100-51640-362-000 GROUNDS MAINTENANCE 150 - - - - - 500 500
100-51640-366-000 BUILDING MAINTENANCE 210 1,197 - 590 - 57 1,000 1,000
10,458 12,786 10,871 12,027 1,629 5,277 19,600 14,600
100-51910-000-000 OTHER GENERAL GOVERNMENT - TAX REFUNDS & JUDGEMENTS
100-51910-390-000 TAX REFUNDS - - - - - - -
100-51910-391-000 UNCOLLECTIBLE TAXES 38 46 - - - - 50 -
100-51931-514-000 CRIME INSURANCE - 664 196 216 47 101 745 745
100-51938-510-000 PROPERTY & LIABILITY INSURANCE 6,431 7,470 6,636 7,429 1,611 3,468 9,000 9,000
100-51980-000-000 MISCELLANEOUS - - 2,685 - - - - -
6,469 8,180 9,517 7,645 1,658 3,569 9,795 9,745
Total General Government Expenditures 660,606 690,965 728,065 663,527 227,442 410,498 991,888 800,779
Wages 215,502 291,770 332,114 291,845 116,406 211,443 474,505 296,921
Benefits & Personnel 74,136 97,470 95,062 96,887 33,292 59,889 116,682 113,416
Services 174,840 163,795 177,226 180,876 41,784 88,477 245,770 251,870
Operating & Maintenance 177,991 113,069 98,228 67,294 22,947 35,400 105,991 113,599
Non-Operating 18,138 20,475 23,148 22,785 12,634 15,289 48,940 24,973
Total General Government Expenditures 660,606 686,578 725,777 659,686 227,063 410,498 991,888 800,779
141
Village of Sister Bay
2027 Annual Budget
52000 Public Safety 12/31/2022 12/31/2023 12/31/2024 12/31/2025 3/31/2026 6/30/2026 2026 2027
Account Description Actual Actual Actual Actual Actual Actual Budget Budget
100-52100-000-000 LAW ENFORCEMENT
100-52100-200-000 SHERIFF SECURITY SERVICES 4,129 1,693 5,221 4,372 - - 6,000 6,000
4,129 1,693 5,221 4,372 - - 6,000 6,000
100-52200-000-000 FIRE PROTECTION
100-52200-000-000 FIRE DEPARTMENT SUPPORT 155,064 159,248 171,032 186,838 46,725 93,450 186,900 197,180
155,064 159,248 171,032 186,838 46,725 93,450 186,900 197,180
100-52400-000-000 INSPECTION
100-52400-200-000 BUILDING INSPECTION SERVICES 52,258 24,280 22,835 18,358 3,341 5,464 30,000 30,000
52,258 24,280 22,835 18,358 3,341 5,464 30,000 30,000
Total Public Safety Expenditures 211,451 185,221 199,088 209,568 50,066 98,914 222,900 233,180
Wages - - - - - - - -
Benefits & Personnel - - - - - - - -
Services 56,386 25,973 28,056 22,729 3,341 5,464 36,000 36,000
Operating & Maintenance - - - - - - - -
Non-Operating 155,064 159,248 171,032 186,838 46,725 93,450 186,900 197,180
211,451 185,221 199,088 209,568 50,066 98,914 222,900 233,180
142
Village of Sister Bay
2027 Annual Budget
53000 Public Works 12/31/2022 12/31/2023 12/31/2024 12/31/2025 3/31/2026 6/30/2026 2026 2027
Account Description Actual Actual Actual Actual Actual Actual Budget Budget
100-53311-000-000 HIGHWAY & STREET MAINTENANCE
100-53311-200-000 CONTRACTED SERVICES - - - - - - - -
100-53311-890-000 CAPITAL OUTLAY - - - - - - - -
- - - - - - - -
100-53312-000-000 PUBLIC WORKS
100-53312-111-000 FULL-TIME WAGES 78,208 82,411 60,543 104,754 35,391 68,670 149,734 137,598
100-53312-112-000 FULL-TIME OVERTIME WAGES 1,451 2,565 1,595 3,871 1,111 1,404 2,288 2,541
100-53312-113-000 COMP TIME 4,565 3,012 2,668 722 224 608 - -
100-53312-114-000 UNWORKED WAGES 33,786 35,551 41,410 38,139 8,822 15,899 7,300 7,401
100-53312-121-000 PART-TIME WAGES 5,315 4,186 8,607 13,329 1,529 3,783 2,824 8,026
100-53312-131-000 RETIREMENT 7,288 8,194 6,978 10,324 3,278 6,232 10,970 10,945
100-53312-132-000 SOCIAL SECURITY 9,004 8,895 8,409 12,535 3,467 6,806 12,457 12,893
100-53312-133-000 HEALTH 20,673 33,413 30,800 41,816 18,721 30,276 43,756 46,198
100-53312-134-000 DENTAL 1,568 2,372 2,026 2,426 1,148 1,848 2,586 2,884
100-53312-135-000 LIFE 223 164 102 243 87 146 402 191
100-53312-136-000 DISABILITY 605 814 309 521 212 351 578 550
100-53312-137-000 HSA 11,921 19,044 19,674 21,545 7,648 13,131 9,858 9,497
100-53312-138-000 EAP 638 656 689 689 115 345 689 689
100-53312-140-000 VISION - 341 342 334 131 210 301 306
100-53312-141-000 UNIFORM/CLOTHING ALLOWANCE 2,171 2,805 2,346 2,568 481 1,196 2,900 2,900
100-53312-142-000 RECRUITMENT/TESTING/PHYSICALS 612 306 346 64 - 771 500 500
100-53312-143-000 RECOGNITION 3,650 3,650 3,550 3,150 - - 3,650 3,000
100-53312-144-000 MILEAGE 256 - - 34 - - 600 100
100-53312-145-000 EXPENSE ALLOWANCE 200 54 - 197 - - 300 200
100-53312-190-000 OTHER PERSONNEL SERVICES 300 841 600 13 - - 600 100
100-53312-200-000 OTHER CONTRACTED SERVICES 211 480 95 271 564 578 300 5,000
100-53312-202-000 WATER/SEWER/STORM 52,375 52,609 52,375 52,591 - 13,094 55,000 55,000
100-53312-204-000 CELL PHONE 2,015 2,028 2,215 3,411 806 1,615 2,500 2,500
100-53312-303-000 EQUIPMENT RENTAL - 1,500 2,094 4,000 - - - -
100-53312-310-000 COMPUTER SOFTWARE 892 358 358
100-53312-312-000 IT SUPPORT 577 712 1,868 2,691 710 1,160 2,300 2,300
100-53312-321-000 OFFICE SUPPLIES 127 444 88 81 152 152 250 100
143
Village of Sister Bay
2027 Annual Budget
53000 Public Works 12/31/2022 12/31/2023 12/31/2024 12/31/2025 3/31/2026 6/30/2026 2026 2027
Account Description Actual Actual Actual Actual Actual Actual Budget Budget
100-53312-324-000 PRINTING & COPING 164 18 26
100-53312-331-000 MEMBERSHIPS/DUES - - - - - - 370
100-53312-332-000 EDUCATION/TRAINING 1,663 2,827 1,090 1,498 100 100 1,800 1,500
100-53312-333-000 CONFERENCES/MEETINGS - 245 822 1,008 - - 2,400
100-53312-351-000 MEDICAL/SAFETY SUPPLIES 3,029 3,920 2,329 1,744 326 2,938 4,000 1,750
100-53312-352-000 MINOR EQUIPMENT AND TOOLS 3,289 8,083 8,837 4,313 1,286 1,922 3,500 3,500
100-53312-353-000 GENERAL SUPPLIES 1,651 3,528 1,880 1,668 461 738 2,500 1,750
100-53312-403-000 SHOP/BUILDING SUPPLIES 3,850 1,147 1,442 1,079 1,354 1,687 2,100 7,000
100-53312-512-000 WORKERS COMPENSATION 9,721 11,737 10,568 9,597 1,918 4,317 15,335 13,793
260,942 298,530 276,697 342,281 90,418 180,362 344,648 340,712
100-53313-000-000 PUBLIC WORKS - MACHINERY
100-53313-111-000 FULL-TIME WAGES - - - - - - - -
100-53313-121-000 PART-TIME WAGES - - - -
100-53313-131-000 RETIREMENT - - - - - - - -
100-53313-132-000 SOCIAL SECURITY - - - - - - - -
100-53313-133-000 HEALTH - - - - - - - -
100-53313-134-000 DENTAL - - - - - - - -
100-53313-135-000 LIFE - - - - - - - -
100-53313-136-000 DISABILITY - - - - - - - -
100-53313-301-000 GAS, OIL, & FLUIDS 14,575 14,986 14,945 12,024 1,507 6,309 14,000 12,000
100-53313-361-000 REPAIRS AND MAINTENANCE 12,897 19,953 13,402 16,758 3,537 13,270 15,000 15,000
100-53313-363-000 VEHICLE MAINTENANCE & REPAIRS 1,819 6,944 3,281 4,547 222 461 5,000 5,000
100-53313-408-000 MISCELLANEOUS 244 1,026 940 8,661 1,004 1,087 2,000 2,000
100-53313-511-000 VEHICLE & EQUIPMENT INSURANCE 2,772 2,477 2,568 2,572 920 1,563 3,380 3,380
32,306 45,386 35,136 44,562 7,189 22,691 39,380 37,380
100-53314-000-000 PUBLIC WORKS - STREET MAINTENANCE
100-53314-111-000 FULL-TIME WAGES 26,979 43,939 40,083 31,413 8,213 12,841 42,325 31,281
100-53314-112-000 FULL-TIME OVERTIME WAGES 111 587 75 606 1,163 1,163 377 418
100-53314-121-000 PART-TIME WAGES 1,321 1,906 1,868 144 105 105 584 1,658
100-53314-131-000 RETIREMENT 1,722 3,115 2,777 2,226 675 1,008 3,100 2,479
144
Village of Sister Bay
2027 Annual Budget
53000 Public Works 12/31/2022 12/31/2023 12/31/2024 12/31/2025 3/31/2026 6/30/2026 2026 2027
Account Description Actual Actual Actual Actual Actual Actual Budget Budget
100-53314-132-000 SOCIAL SECURITY 1,962 3,432 3,001 2,326 685 1,021 3,614 3,031
100-53314-133-000 HEALTH 5,653 10,151 12,872 10,874 3,252 4,719 15,014 11,858
100-53314-134-000 DENTAL 406 719 885 624 186 271 903 736
100-53314-135-000 LIFE 68 75 50 32 10 14 72 33
100-53314-136-000 DISABILITY 166 135 162 122 36 54 162 125
100-53314-137-000 HSA 207 248 126 765 - - 3,088 2,425
100-53314-140-000 VISION - 102 138 81 19 27 102 79
100-53314-200-000 OTHER CONTRACTED SERVICES 1,982 2,457 11,786 10,663 - 1,910 4,000 5,000
100-53314-303-000 EQUIPMENT RENTAL - - - - - - 2,000 2,000
100-53314-312-000 INFORMATION TECHNOLOGY 330 4,412 3,593 - - - 3,000 -
100-53314-325-000 NOTICES & ADS 281 - - - - - - -
100-53314-332-000 EDUCATION/TRAINING - - - - - - 1,000 -
100-53314-352-000 MINOR EQUIPMENT AND TOOLS 3,745 1,497 6,813 - - - 1,000 -
100-53314-353-000 GENERAL SUPPLIES 1,702 7,435 1,512 680 591 1,091 4,000 1,000
100-53314-361-000 REPAIRS & MAINTENANCE 383 2,574 4,005 - - - 500 -
100-53314-406-000 CRACK FILLER - - 16 - - - 500 -
100-53314-407-000 PATCH MATERIAL 441 462 360 - - 120 1,500 1,500
100-53314-408-000 MISCELLANEOUS - - - - - - 500 -
47,458 83,245 90,123 60,558 14,934 24,344 87,341 63,623
100-53316-000-000 PUBLIC WORKS - STREET CLEANING
100-53316-111-000 FULL-TIME WAGES - - - - - - - -
100-53316-112-000 FULL-TIME OVERTIME W - - - - - - - -
100-53316-121-000 PART-TIME WAGES - - - - - - - -
100-53316-131-000 RETIREMENT - - - - - - - -
100-53316-132-000 SOCIAL SECURITY - - - - - - - -
100-53316-133-000 HEALTH - - - - - - - -
100-53316-134-000 DENTAL - - - - - - - -
100-53316-135-000 LIFE - - - - - - - -
100-53316-136-000 DISABILITY - - - - - - - -
100-53316-200-000 OTHER CONTRACTED SERVICES 608 1,497 4,220 4,248 - 4,010 5,000 4,250
145
Village of Sister Bay
2027 Annual Budget
53000 Public Works 12/31/2022 12/31/2023 12/31/2024 12/31/2025 3/31/2026 6/30/2026 2026 2027
Account Description Actual Actual Actual Actual Actual Actual Budget Budget
608 1,497 4,220 4,248 - 4,010 5,000 4,250
146
Village of Sister Bay
2027 Annual Budget
53000 Public Works 12/31/2022 12/31/2023 12/31/2024 12/31/2025 3/31/2026 6/30/2026 2026 2027
Account Description Actual Actual Actual Actual Actual Actual Budget Budget
100-53317-000-000 PUBLIC WORKS - SNOW & ICE
100-53317-111-000 FULL-TIME WAGES - - - - - - - -
100-53317-112-000 OVERTIME WAGES - - - - - - - -
100-53317-121-000 PART-TIME WAGES - - - - - - - -
100-53317-131-000 RETIREMENT - - - - - - - -
100-53317-132-000 SOCIAL SECURITY - - - - - - - -
100-53317-133-000 HEALTH - - - - - - - -
100-53317-134-000 DENTAL - - - - - - - -
100-53317-135-000 LIFE - - - - - - - -
100-53317-136-000 DISABILITY - - - - - - - -
100-53317-200-000 OTHER CONTRACTED SERVICES 22,588 22,294 18,163 39,164 12,154 22,589 35,000 35,000
100-53317-352-000 MINOR TOOLS & EQUIPMENT 178 7,080 9,999 150 10,908 12,000 2,000
100-53317-404-000 SALT 1,000 1,570 650 - 1,080 1,080 2,000 2,000
100-53317-405-000 SAND 388 - -
23,588 24,430 25,893 49,163 13,384 34,577 49,000 39,000
100-53318-000-000 PUBLIC WORKS - STREET SIGNS
100-53318-111-000 FULL-TIME WAGES - - - - - - - -
100-53318-131-000 RETIREMENT - - - - - - - -
100-53318-132-000 SOCIAL SECURITY - - - - - - - -
100-53318-133-000 HEALTH - - - - - - - -
100-53318-134-000 DENTAL - - - - - - - -
100-53318-135-000 LIFE - - - - - - - -
100-53318-136-000 DISABILITY - - - - - - - -
100-53318-200-000 OTHER CONTRACTED SERVICES 1,137 3,954 1,641 1,800 243 243 3,000 2,000
100-53318-312-000 INFORMATION TECHNOLOGY 2,329 - - - - - -
100-53318-353-000 GENERAL SUPPLIES 523 3,548 339 2,003 - 399 2,500 2,000
100-53318-361-000 REPAIRS & MAINTENANCE 1,414 387 - - - - 1,000 -
3,074 10,218 1,980 3,803 243 641 6,500 4,000
100-53319-000-000 PUBLIC WORKS - CURB & GUTTER
100-53319-200-000 OTHER CONTRACTED SERVICES - - - - - - - -
100-53319-890-000 OUTLAY - INFRASTRUCTURE - - - - - - - -
147
Village of Sister Bay
2027 Annual Budget
53000 Public Works 12/31/2022 12/31/2023 12/31/2024 12/31/2025 3/31/2026 6/30/2026 2026 2027
Account Description Actual Actual Actual Actual Actual Actual Budget Budget
- - - - - - - -
148
Village of Sister Bay
2027 Annual Budget
53000 Public Works 12/31/2022 12/31/2023 12/31/2024 12/31/2025 3/31/2026 6/30/2026 2026 2027
Account Description Actual Actual Actual Actual Actual Actual Budget Budget
100-53322-000-000 PUBLIC WORKS - SEASONAL DECORATIONS
100-53322-111-000 FULL-TIME WAGES 140 13,179 13,872 8,671 3,196 3,778 13,023 10,708
100-53322-112-000 FULL-TIME OVERTIME - - 208 226 - - - -
100-53322-113-000 COMP TIME-SESONAL DEC 324 - - - - - -
100-53322-121-000 PART-TIME WAGES - 1,047 522 - - - 350 995
100-53322-131-000 RETIREMENT 9 925 972 618 230 272 954 860
100-53322-132-000 SOCIAL SECURITY 11 1,028 1,050 634 229 271 112 1,073
100-53322-133-000 HEALTH - 4,433 3,657 3,604 1,286 1,467 4,620 4,268
100-53322-134-000 DENTAL - 325 260 220 75 85 278 267
100-53322-135-000 LIFE - 12 12 9 3 4 22 12
100-53322-136-000 DISABILITY - 79 44 37 13 15 50 43
100-53322-137-000 HSA - - 738 - - 950 873
100-53322-140-000 VISION 52 45 31 8 9 32 29
100-53322-200-000 OTHER CONTRACTED SERVICES - 1,575 3,240 3,465 - 1,665 4,000 4,000
100-53322-353-000 GENERAL SUPPLIES 16,591 7,635 4,237 3,587 - 4,791 10,000 5,000
100-53322-361-000 REPAIRS & MAINTENANCE 12 - 3,021 17 - - 5,000 -
16,763 30,614 31,140 21,858 5,040 12,356 39,391 28,128
100-53420-000-000 PUBLIC WORKS - STREET LIGHTING
100-53420-201-000 ELECTRIC/GAS 22,122 24,547 23,794 20,805 3,373 8,914 23,000 16,000
100-53420-353-000 GENERAL SUPPLIES 252 675 984 839 - - 1,000 1,000
22,374 25,223 24,778 21,644 3,373 8,914 24,000 17,000
100-53431-000-000 PUBLIC WORKS - SIDEWALK MAINTENANCE & REPLACEMENT
100-53431-353-000 GENERAL SUPPLIES - - 17 - - - 1,000 1,000
- - 17 - - - 1,000 1,000
100-53441-000-000 PUBLIC WORKS - STORM SEWER MAINTENANCE
100-53441-111-000 FULL-TIME WAGES 2,480 1,438 5,909 4,342 1,064 2,051 6,511 8,947
100-53441-112-000 FULL-TIME OVERTIME 45 - - - - - - -
100-53441-121-000 PART-TIME WAGES 42 - - - - -
100-53441-131-000 RETIREMENT 164 98 409 302 77 148 477 693
149
Village of Sister Bay
2027 Annual Budget
53000 Public Works 12/31/2022 12/31/2023 12/31/2024 12/31/2025 3/31/2026 6/30/2026 2026 2027
Account Description Actual Actual Actual Actual Actual Actual Budget Budget
100-53441-132-000 SOCIAL SECURITY 173 103 421 318 78 150 556 814
100-53441-133-000 HEALTH 564 397 1,842 1,108 300 549 2,310 3,083
100-53441-134-000 DENTAL 33 21 123 62 17 31 139 188
100-53441-135-000 LIFE 11 8 10 4 1 2 11 9
100-53441-136-000 DISABILITY 15 9 23 16 5 9 25 36
100-53441-137-000 HSA 94 12 - - - 5 475 631
100-53441-140-000 VISION - 2 18 8 2 3 16 19
100-53441-200-000 OTHER CONTRACTED SERVICES 3,381 4,324 4,993 - - - 11,400 5,000
100-53441-201-000 ELECTRIC/GAS 1,241 985 778 - - - 1,200 -
100-53441-312-000 IT SUPPORT 1,000 2,993 3,093 - - - 3,150 -
100-53441-361-000 REPAIRS & MAINTENANCE 3,911 361 6,155 - 508 508 5,000 -
13,115 10,751 23,812 6,161 2,051 3,456 31,270 19,420
100-53520-000-000 PUBLIC WORKS - PUBLIC TRANSPORTATION
100-53520-121-000 PART-TIME WAGES 9,991 4,615 10,831 15,106 389 3,367 15,282 15,282
100-53520-122-000 PART-TIME OVERTIME - - - - - - - -
100-53520-131-000 RETIREMENT - - - - - - - -
100-53520-132-000 SOCIAL SECURITY 877 353 829 1,156 30 258 1,169 1,169
100-53520-133-000 HEALTH BENEFITS - - - - - - - -
100-53520-134-000 DENTAL BENEFITS - - - - - - - -
100-53520-135-000 LIFE BENEFITS - - - - - - - -
100-53520-136-000 DISABILITY BENEFITS - - - - - - - -
100-53520-142-000 RECRUITMENT/TESTING - - 502 72 - - 400 400
100-53520-200-000 OTHER CONTRACTED SERVICES 360 4,250 - 559 - 792 2,100 1,000
100-53520-301-000 GAS, OIL & FLUIDS 4,124 1,842 2,552 3,355 62 62 4,500 4,000
100-53520-351-000 MEDICAL/SAFETY SUPPLIES 47 - - - - - 75 -
100-53520-353-000 GENERAL SUPPLIES 370 - 665 1,756 - - 350 350
100-53520-363-000 VEHICLE MAINTENANCE & REPAIRS 3,274 1,122 405 629 - - 1,350 500
100-53520-408-000 MISCELLANEOUS - - 323 - - - 960 -
100-53520-511-000 INSURANCE 298 299 308 1,452 398 761 1,200 1,200
100-53520-512-000 WORKERS COMP 372 349 339 368 97 189 515 515
150
Village of Sister Bay
2027 Annual Budget
53000 Public Works 12/31/2022 12/31/2023 12/31/2024 12/31/2025 3/31/2026 6/30/2026 2026 2027
Account Description Actual Actual Actual Actual Actual Actual Budget Budget
19,713 12,830 16,753 24,451 976 5,429 27,901 24,416
100-53620-000-000 PUBLIC WORKS -REFUSE AND GARBAGE COLLECTION
100-53620-208-000 GARBAGE 159,628 168,490 170,415 173,510 23,828 65,314 180,000 180,000
100-53620-353-000 GARBAGE RECEPTACLES - - 4,795 - - - - -
159,628 168,490 175,210 173,510 23,828 65,314 180,000 180,000
100-53635-000-000 PUBLIC WORKS - RECYCLING
100-53635-207-000 RECYCLING 24,138 28,732 33,744 33,535 4,415 12,848 35,000 35,000
24,138 28,732 33,744 33,535 4,415 12,848 35,000 35,000
100-53640-000-000 PUBLIC WORKS - WEED AND NUISANCE CONTROL
100-53640-200-000 OTHER CONTRACTED SERVICES - - - - - 300 8,500 8,500
100-53640-211-000 WEED CONTROL 12,315 13,115 11,676 3,849 - 1,350 7,000 4,200
12,315 13,115 11,676 3,849 - 1,650 15,500 12,700
Total Public Works Expenditures 636,022 753,060 751,180 789,623 165,850 376,591 885,931 806,629
Wages 164,393 194,760 188,189 221,323 61,207 113,669 240,598 224,855
Benefits & Personnel 71,244 107,383 106,398 122,448 42,503 71,704 128,798 126,186
Services 304,101 331,335 339,134 347,869 45,382 135,220 377,000 362,450
Operating & Maintenance 83,121 104,333 103,633 83,993 13,425 49,167 119,105 74,250
Non-Operating 13,164 14,862 13,784 13,990 3,333 6,830 20,430 18,888
Capital Outlay - - - - - - - -
636,022 752,672 751,138 789,623 165,850 376,591 885,931 806,629
151
Village of Sister Bay
2027 Annual Budget
54000 Health & Human Services 12/31/2022 12/31/2023 12/31/2024 12/31/2025 3/31/2026 6/30/2026 2026 2027
Account Description Actual Actual Actual Actual Actual Actual Budget Budget
100-54100-000-000 HEALTH & HUMAN SERVICES - ANIMAL CONTROL
100-54100-121-000 PART-TIME WAGES 1,147 1,200 1,305 1,135 300 600 1,482 1,482
100-54100-132-000 SOCIAL SECURITY 88 92 100 87 23 46 113 113
100-54100-144-000 MILEAGE 44 - 151 55 - - 200 200
100-54100-512-000 WORKERS COMP 2 51 45 40 11 21 59 59
1,281 1,343 1,600 1,317 334 667 1,854 1,854
100-54910-000-000 HEALTH & HUMAN SERVICES - CEMETERY
100-54910-000-000 CEMETERY 4,275 2,627 8,010 8,271 - - 8,000 16,000
4,275 2,627 8,010 8,271 - - 8,000 16,000
Total Health & Human Services Expenditures 5,556 3,970 9,610 9,588 334 667 9,854 17,854
Wages 1,147 1,200 1,305 1,135 300 600 1,482 1,482
Benefits & Personnel 132 92 251 141 23 46 313 313
Services 4,275 2,627 8,010 8,271 - - 8,000 16,000
Operating & Maintenance - - - - - - - -
Non-Operating 2 51 45 40 11 21 59 59
5,556 3,970 9,610 9,588 334 667 9,854 17,854
152
Village of Sister Bay
2027 Annual Budget
55000 Culture, Recreation & Education12/31/2022 12/31/2023 12/31/2024 12/31/2025 3/31/2026 6/30/2026 2026 2027
Account Description Actual Actual Actual Actual Actual Actual Budget Budget
100-55110-000-000 CRE - LIBRARY
100-55110-111-000 FULL-TIME WAGES 1,150 1,262 1,061 809 53 80 1,628 1,114
100-55110-112-000 FULL-TIME OVERTIME WAGES 86 - 37 124 - - 100 -
100-55110-121-000 PART-TIME WAGES 302 454 169 227 80 80 165 663
100-55110-131-000 RETIREMENT 80 86 76 66 4 6 119 91
100-55110-132-000 SOCIAL SECURITY 109 125 90 84 9 11 139 117
100-55110-133-000 HEALTH 238 317 350 381 116 125 577 474
100-55110-134-000 DENTAL 20 23 24 25 7 8 35 30
100-55110-135-000 LIFE 1 1 1 1 0 0 3 1
100-55110-136-000 DISABILITY 7 7 4 4 1 1 6 4
100-55110-137-000 HSA BENEFITS -LIBRARY 26 - - - - 119 97
100-55110-140-000 VISION - 4 4 4 1 1 4 3
100-55110-200-000 OTHER CONTRACTED SERVICES 37,892 42,476 39,229 41,817 9,672 20,144 41,888 41,888
100-55110-201-000 ELECTRIC/GAS - - - 1,783 996 84 1,600 -
100-55110-510-000 INSURANCE 1,744 1,900 2,109 2,109 2,000 -
39,886 44,781 42,788 47,224 13,049 22,650 48,383 44,482
100-55190-000-000 CRE - OTHER CULTURE & ORGANIZATIONS
100-55190-200-000 MISC OTHER CULTURE 973 2,000 15,394 568 - - 2,500 1,250
100-55191-000-000 HISTORICAL SOCIETY 30,000 5,000 5,000 15,000 15,000 15,000 15,000 30,000
100-55192-000-000 COASTAL BYWAYS 1,300 500 500 500 500 500 500 500
100-55198-000-000 SAIL DOOR COUNTY - 10,000 10,000 10,000 10,000
32,273 7,500 20,894 16,068 25,500 25,500 28,000 41,750
100-55193-000-000 CRE - SBAA SUPPORT
100-55193-111-000 FULL-TIME WAGES 4,655 6,685 8,587 8,733 1,584 3,096 14,307 13,987
100-55193-112-000 FULL-TIME OVERTIME WAGES 4,606 4,486 2,941 945 - - 5,600 12,114
100-55193-113-000 COMP TIME - - - - - - - -
100-55193-121-000 PART-TIME WAGES 1,508 1,244 1,100 620 - - 1,000 1,990
100-55193-122-000 PART-TIME OVERTIME WAGES - 178 341 - - - - -
100-55193-131-000 RETIREMENT 531 760 795 673 114 223 720 1,057
100-55193-132-000 SOCIAL SECURITY 623 885 940 768 118 230 1,100 1,281
100-55193-133-000 HEALTH 1,195 3,441 2,680 1,565 374 699 3,000 4,980
100-55193-134-000 DENTAL 113 246 129 93 20 39 278 308
153
Village of Sister Bay
2027 Annual Budget
55000 Culture, Recreation & Education12/31/2022 12/31/2023 12/31/2024 12/31/2025 3/31/2026 6/30/2026 2026 2027
Account Description Actual Actual Actual Actual Actual Actual Budget Budget
100-55193-135-000 LIFE 5 11 10 10 2 3 20 14
100-55193-136-000 DISABILITY 41 62 38 22 7 12 40 54
100-55193-137-000 HSA SBAA SUPPORT 60 - 19 0 0 - 1,019
100-55193-140-000 VISION - 38 34 13 2 4 40 32
100-55193-145-000 EXPENSE ALLOWANCE 35 139 - - - - - -
100-55193-200-000 SUPPORT 32,349 57,483 64,134 68,270 - 17,961 70,000 72,000
100-55193-208-000 GARBAGE 1,391 1,469 - 1,358 - - 1,500 1,500
100-55193-303-000 EQUIPMENT RENTAL 1,791 1,791 1,762 2,201 - - 2,000 2,000
100-55193-353-000 GENERAL SUPPLIES 82 201 197 187 - 59 200 200
100-55193-362-000 GROUNDS REPAIR & MAINTENANCE 29 435 - - - - 200 -
100-55193-401-000 CUSTODIAL SUPPLIES - - - - - - 300 -
48,954 79,612 83,688 85,476 2,221 22,327 100,305 112,536
100-55190-000-000 CRE - OTHER CULTURE & ORGANIZATIONS
100-55194-000-000 DOOR COUNTY HUMANE SOCIETY 5,000 5,000 5,000 5,000 5,000 5,000 - -
100-55195-000-000 DOOR COUNTY SOIL & WATER 1,000 1,000 1,000 - - - - -
100-55196-000-000 YOUTH CENTER SUPPORT (4,377) - - - - - - -
100-55197-000-000 NORTHERN DOOR CHILDREN'S CENTER 5,000 - - - - -
1,623 6,000 11,000 5,000 5,000 5,000 - -
100-55200-000-000 CRE - PARKS
100-55200-111-000 FULL-TIME WAGES 45,703 57,854 85,636 72,531 9,702 28,127 104,005 110,252
100-55200-112-000 FULL-TIME OVERTIME WAGES 2,314 2,631 4,189 2,557 - 131 4,500 7,101
100-55200-113-000 COMP TIME 45 - 98 - - - - -
100-55200-114-000 UNWORKED WAGES 228 - - - - - - -
100-55200-121-000 PART-TIME WAGES 7,301 6,695 7,128 9,397 383 988 789 9,088
100-55200-131-000 RETIREMENT 3,128 4,120 6,205 5,174 697 2,033 7,601 8,618
100-55200-132-000 SOCIAL SECURITY 3,977 4,764 6,952 6,223 756 2,176 8,767 10,389
100-55200-133-000 HEALTH 7,430 17,265 27,649 20,064 2,207 6,774 34,648 37,313
100-55200-134-000 DENTAL 684 1,259 1,865 1,183 117 382 2,101 2,280
100-55200-135-000 LIFE 36 63 85 111 9 23 227 109
100-55200-136-000 DISABILITY 244 547 330 247 39 99 398 435
100-55200-137-000 HSA 1536.31 704 - 330 1 1 7,125 7,518
154
Village of Sister Bay
2027 Annual Budget
55000 Culture, Recreation & Education12/31/2022 12/31/2023 12/31/2024 12/31/2025 3/31/2026 6/30/2026 2026 2027
Account Description Actual Actual Actual Actual Actual Actual Budget Budget
100-55200-140-000 VISION 0 191 293 159 12 40 241 244
100-55200-200-000 OTHER CONTRACTED SERVICES 4,341 10,867 14,924 12,500 - 5,338 12,500 12,500
100-55200-201-000 ELECTRIC/GAS 1,503 1,960 1,946 1,962 2,148 4,203 2,250 2,250
100-55200-202-000 WATER/SEWER/STORM 4,008 4,255 4,300 4,512 - 1,106 4,000 4,000
100-55200-205-000 INTERNET - 60 407
100-55200-312-000 IT SUPPORT 132 - - - - - - -
100-55200-331-000 MEMBERSHIPS/DUES - 480 - 208 - - 500 -
100-55200-333-000 CONFERENCES/MEETINGS - 475 - - - - 1,000 -
100-55200-351-000 MEDICAL/SAFETY SUPPLIES - 547 33 - - - - -
100-55200-352-000 MINOR EQUIPMENT AND TOOL 2,687 1,809 663 1,882 - 189 2,000 2,000
100-55200-353-000 GENERAL SUPPLIES 1,619 11,178 5,785 14,000 187 2,093 6,500 11,700
100-55200-355-000 MEMORIALS SUPPLIES 241 961 145 1,159 - 593 4,000 20,800
100-55200-358-000 FLOWER POTS 4,340 4,058 5,448 4,435 - 894 5,500 5,000
100-55200-361-000 REPAIRS AND MAINTENANCE 4,488 7,124 14,326 22,999 - 3,346 18,000 5,000
100-55200-362-000 GROUNDS MAINTENANCE 5,260 11,616 10,672 7,824 2,770 3,022 5,000 5,000
100-55200-369-000 EQUIPMENT MAINTENANCE - - 302 - 275 1,500 1,500
100-55200-402-000 CHEMICALS 44 20 - - - - 100 -
101,291 151,442 198,671 189,760 19,088 62,240 233,252 263,097
100-55201-000-000 CRE - DOG PARK
100-55201-200-000 OTHER CONTRACTED SERVICES 1,270 1,210 1,320 1,245 375 750 1,320 1,300
100-55201-202-000 WATER/SEWER 199 205 205 246 - 39 275 275
100-55201-353-000 GENERAL SUPPLIES 626 419 489 - - - 500 -
100-55201-362-000 GROUNDS MAINTENANCE - - - - - - - -
2,095 1,834 2,014 1,491 375 789 2,095 1,575
155
Village of Sister Bay
2027 Annual Budget
55000 Culture, Recreation & Education12/31/2022 12/31/2023 12/31/2024 12/31/2025 3/31/2026 6/30/2026 2026 2027
Account Description Actual Actual Actual Actual Actual Actual Budget Budget
100-55202-000-000 CRE - WATERFRONT PARK
100-55202-200-000 OTHER CONTRACTED SERVICES - 4,679 - - - - - -
100-55202-353-000 GENERAL SUPPLIES 1,067 1,087 174 - - - - -
100-55202-362-000 GROUNDS MAINTENANCE 1,870 20,016 - - - - - -
2,937 25,782 174 - - - - -
100-55203-000-000 CRE - PAVILION
100-55203-366-000 BUILDING MAINTENANCE - - - - - - -
- - - - - - - -
100-55204-000-000 CRE - SLEDDING HILL
100-55204-392-000 MISCELLANEOUS - - - - - - -
- - - - - - - -
100-55300-000-000 CRE -RECREATION PROGRAMS & EVENTS
100-55300-111-000 FULL-TIME WAGES - 835 570 129 - - 651 1,344
100-55300-112-000 FT OT WAGES 109 (114) - -
100-55300-121-000 PART-TIME WAGES - - - - - -
100-55300-131-000 RETIREMENT - 57 47 1 - - 48 102
100-55300-132-000 SOCIAL SECURITY - 61 45 0 - - 56 116
100-55300-133-000 HEALTH - 145 291 59 - - 231 427
100-55300-134-000 DENTAL - 11 18 4 - - 14 26
100-55300-135-000 LIFE - 0 1 0 - - 1 1
100-55300-136-000 DISABILITY - 1 3 1 - - 2 6
100-55300-137-000 HSA - 114 - - - 48 88
100-55300-140-000 VISION - 2 3 1 - - 2 2
100-55300-144-000 MILEAGE - - 410 557 - 460 750 750
100-55300-145-000 EXPENSE ALLOWANCE - 55 80 186 - - 600 600
100-55300-200-000 CONTRACTED SERVICES - 2,387 - - - - - -
100-55300-358-000 FIREWORKS - 6,893 8,583 6,068 135 14,814 9,000 6,000
100-55300-392-000 MISCELLANEOUS 9,214 282 206 - - - 200 200
156
Village of Sister Bay
2027 Annual Budget
55000 Culture, Recreation & Education12/31/2022 12/31/2023 12/31/2024 12/31/2025 3/31/2026 6/30/2026 2026 2027
Account Description Actual Actual Actual Actual Actual Actual Budget Budget
9,214 10,728 10,480 6,890 135 15,273 11,603 9,662
100-55400-000-000 CRE - SPORTS COMPLEX/RECREATION FACILITIES
100-55400-111-000 FULL-TIME WAGES 15,733 17,532 14,437 12,272 2,644 5,456 19,534 17,868
100-55400-112-000 FULL-TIME OVERTIME WAGES 265 162 346 618 - 111 188 -
100-55400-121-000 PART-TIME WAGES 3,090 5,303 6,323 6,385 206 923 2,101 5,970
100-55400-131-000 RETIREMENT 1,027 1,203 1,020 858 190 401 1,430 1,421
100-55400-132-000 SOCIAL SECURITY 1,369 1,637 1,544 1,427 208 476 1,668 1,748
100-55400-133-000 HEALTH 2,380 5,311 4,696 3,639 827 1,658 6,930 6,878
100-55400-134-000 DENTAL 224 381 348 221 49 101 417 428
100-55400-135-000 LIFE 12 14 14 11 3 6 33 19
100-55400-136-000 DISABILITY 90 178 56 43 11 22 75 71
100-55400-137-000 HSA 72 - 190 55 - - 1,425 1,407
100-55400-140-000 VISION - 57 56 31 5 11 47 46
100-55400-200-000 OTHER CONTRACTED SERVICES 540 48 1,007 2,527 - 1,083 9,300 9,300
100-55400-201-000 ELECTRIC/GAS 7,316 6,210 6,828 7,317 7,409 9,948 7,500 7,500
100-55400-202-000 WATER/SEWER/STORM 10,501 8,416 7,629 9,667 - 809 10,000 10,000
100-55400-203-000 PHONE 326 391 443 419 31 125 400 400
100-55400-205-000 INTERNET 380 380
100-55400-351-000 MEDICAL & SAFETY 69 76 - -
100-55400-352-000 MINOR EQUIPMENT 557 851 - 34 - - 1,000 -
100-55400-353-000 GENERAL SUPPLIES 768 260 809 1,282 - 127 1,500 -
100-55400-361-000 REPAIRS & MAINTENANCE 2,206 5,534 4,032 276 - 1,115 5,000 1,000
100-55400-362-000 GROUNDS MAINTENANCE 2,086 3,279 9,645 4,786 1,848 7,890 5,000 5,000
100-55400-366-000 BUILDING MAINTENANCE 2,810 572 18 - - - 2,000 -
51,373 57,339 59,509 51,945 13,812 30,639 75,548 69,056
100-55403-000-000 CRE - BIKE TRAIL
100-55403-201-000 ELECTRIC 1,373 1,624 2,047 2,065 160 1,030 2,000 2,000
100-55403-353-000 GENERAL SUPPLIES 185 - - - - - 500 1,500
100-55403-361-000 REPAIRS AND MAINTENANCE - - - - - - 2,500 -
1,558 1,624 2,047 2,065 160 1,030 5,000 3,500
157
Village of Sister Bay
2027 Annual Budget
55000 Culture, Recreation & Education12/31/2022 12/31/2023 12/31/2024 12/31/2025 3/31/2026 6/30/2026 2026 2027
Account Description Actual Actual Actual Actual Actual Actual Budget Budget
Total Other Culture & Recreation Expenditures 291,202 386,642 431,265 405,920 79,340 185,449 504,186 545,658
Wages 86,986 105,321 133,072 115,233 14,653 38,993 154,568 181,491
Benefits & Personnel 25,209 44,252 57,488 44,310 5,907 16,024 81,085 90,604
Services 103,983 145,681 159,405 156,257 21,231 63,408 167,033 166,163
Operating & Maintenance 42,101 79,887 63,056 67,720 4,940 34,416 74,000 66,900
Non-Operating 32,923 11,500 18,244 22,400 32,609 32,609 27,500 40,500
Capital Outlay - - - - - - - -
291,202 386,642 431,265 405,920 79,340 185,449 504,186 545,658
- - - - - - - -
158
Village of Sister Bay
2027 Annual Budget
56000 Conservation & Development 12/31/2022 12/31/2023 12/31/2024 12/31/2025 3/31/2026 6/30/2026 2026 2027
Account Description Actual Actual Actual Actual Actual Actual Budget Budget
100-56110-000-000 FORESTRY
100-56110-111-000 FULL-TIME WAGES - 6,652 123 771 468 873 1,628 1,563
100-56110-121-000 PART-TIME WAGES - 632 128 - - - 280 796
100-56110-131-000 RETIREMENT - 452 9 54 34 63 119 124
100-56110-132-000 SOCIAL SECURITY - 512 - 56 34 64 139 152
100-56110-133-000 HEALTH - 1,956 - 222 132 231 577 593
100-56110-134-000 DENTAL - 136 - 13 7 13 35 37
100-56110-135-000 LIFE - 5 - 1 1 1 3 1
100-56110-136-000 DISABILITY - 38 - 3 2 4 6 8
100-56110-140-000 VISION - 19 - 2 1 1 4 5
100-56110-200-000 CONTRACTED SERVICES - 35 14,396 - - - 5,000 5,000
- 10,438 14,656 1,121 679 1,251 7,791 8,279
100-56200-000-000 ENVIRONMENTAL PROTECTION - GREEN TIER
100-56200-144-000 MILEAGE - - - - - - 250 250
100-56200-200-000 SERVICES & GENERAL SUPPORT - -