POSTED ON: 5/28/2026
PARKS, PROPERTY & STREETS COMMITTEE
MEETING AGENDA
MONDAY, JUNE 1, 2026, AT 1:00 PM
Sister Bay Liberty Grove Fire Station – 2258 Mill Road, Large Meeting Room
To access the meeting electronically, click: https://zoom.us/j/4439901723?pwd=yAVpi40M1OIqgNufcVUE8XWCUSkKaH.1&omn=97063638580
Meeting ID: 443 990 1723 Passcode: 304078 To connect by phone: 1-301-715-8592 - Meeting ID 443 990 1723#
For additional information visit: www.sisterbaywi.gov and click ‘Meetings’
AGENDA
1. Call to Order & Roll Call
2. Approve Agenda
3. Approve Minutes:
a) May 4, 2026, Regular Meeting
4. Comments, Correspondence, and Concerns from the Public
5. Discussion/Action Items
a) Memorial Bench Policy Discussion
b) Memorial Bench Submissions for Review
i. Winn Family Memorial Bench Application
ii. Strang Family Memorial Bench Application
iii. Janko Family Memorial Bench Application
iv. Rafferty Family Memorial Bench Application
c) DNR Encumbrance
d) HWY 57 Trail – DOT Concerns
e) Logerquist Property - Vision/Maintenance for Site
f) Cold Storage Procurement
6. Staff Report
7. Matters to be Placed on a Future Agenda or Referred to a Committee, Official or Employee
8. Next Regular Meeting:
a) July 6, 2026 at 1:00 PM
9. Adjourn
Public Notice – PARKS, PROPERTY & STREETS COMMITTEE MEETINGS ONLY
For questions regarding the above agenda items or to review the related files, call the Administration Office (phone number below)
or email info@sisterbaywi.gov. To submit letters in support or opposition of an agenda item, email adminassist@sisterbaywi.gov
by 4:00 p.m. the day before the meeting. Letters received after the meeting packet has been mailed will NOT be sent to committee
members but will be SUMMARIZED at the meeting. It is possible that members of, or quorum of, other governmental bodies may
attend the meeting to gather information; no action will be taken by any governmental body other than the body specifically
referred to above. Upon reasonable notice, a good faith effort will be made to accommodate the needs of disabled individuals
through sign language interpreters or other auxiliary aid or accommodation at no cost to the individual. Due to the difficulty in
finding interpreters, requests should be made as far in advance as possible, preferably a minimum of 48 hours. For additional
information or to request this service, contact the Sister Bay Village Administration Office at 854-4118 or by writing to the Village
Administration Building, 2383 Maple Drive, PO Box 769, Sister Bay, WI 54234. Copies of reports and other supporting
documentation are available for review at the Village Administration Building during operating hours (8 a.m. – 4 p.m. Mondays
through Thursdays, and 8 a.m. – 12:00 p.m. Fridays).
The Village of Sister Bay is an Equal Opportunity Provider & Employer
1 Committee Chair, Trustee – Louise Howson 2 Trustee - Vacant
3 Trustee - Nate Bell 4 Citizen Member - Jerry Ahrens
5 Citizen Member - Mike Laszkiewicz Village Administrator – Benjamin Andrews
Department Director – Erik Linczmaier Administrative Assistant – Sarah Bertges
1
PARKS, PROPERTY & STREETS COMMITTEE MINUTES 1
MONDAY, MAY 4, 2026 2
(Approval Pending) 3
4
5
1. Call to Order & Roll Call 6
May 4, 2026, meeting of the Parks, Property & Streets Committee was called to order by Committee 7
Chair Howson at 1:00 P.M. 8
9
Committee Members Present: Committee Chair Louise Howson and members Jerry Ahrens, Nate 10
Bell, and Mike Laszkiewicz 11
12
Staff Members Present: Village Administrator Benjamin Andrews, Parks & Streets Director Erik 13
Linczmaier, and Administrative Assistant Sarah Bertges 14
15
Public Present: Rachel Stollenwerk, Abby Doobie, Erin Peddle, Jill Wiebe 16
17
2. Approve Agenda 18
Motion by Bell, second by Ahrens, to approve the agenda. Motion carried – all ayes. 19
20
3. Approve Minutes April 6, 2026, Regular Meeting 21
Motion to approve the April 6, 2026 minutes as presented by Bell, Second by Ahrens. Motion carried 22
– all ayes. 23
24
4. Comments, Correspondence, and Concerns from the Public 25
Correspondence received from Top of the Thumb was acknowledged. 26
27
5. Discussion/Action Items 28
29
a. Northern Door Sports and Recreation; Proposal; Facility Reservations Management 30
Andrews reported that following the previous meeting, Northern Door Sports and Recreation 31
revised their proposal to cover facility reservations management specifically for the tennis courts, 32
gazebo, and sports complex. The revised annual fee is $1,450. Laszkiewicz relayed feedback 33
gathered from local residents and court users. Key concerns included ensuring the system does not 34
become overly bureaucratic, preventing preferential reservations, guaranteeing walk-up access on 35
open courts, and ensuring courts vacated by no-shows remain available to the public. Rachel 36
Stollenwerk, representing Northern Door Sports and Recreation, confirmed that all of these 37
parameters — including reservation frequency limits, advance booking windows, and no-show 38
forfeiture rules — can be configured during the onboarding process. 39
The committee discussed the primary benefits of the proposal: reducing staff time and burden, 40
improving public access through real-time calendar visibility, and beginning a broader modernization 41
of village reservation systems including data collection useful for grant applications and budget 42
planning. 43
The committee agreed to delegate parameter-setting to staff, with Laszkiewicz offering to serve as a 44
liaison during onboarding. The recommendation will be forwarded to the Village Board for approval 45
at the May 19 meeting. 46
Motion to recommend approval of the Northern Door Sports and Recreation proposal to the Village 47
Board, and to authorize staff to work with Northern Door Sports and Recreation to establish 48
reservation parameters, consulting appropriate parties as needed, was made by Bell and second by 49
Ahrens. Motion carried — all ayes. 50
51
2
Minutes of the May 4, 2026, meeting of the Parks, Property & Streets Committee – unapproved
2
b. Memorial Bench Policy Discussion 1
Andrews provided an update, noting that cost estimates for bench installation under the revised 2
policy are still pending from the contractor. The committee expects costs to be available for the June 3
meeting. 4
The committee reached consensus on the following policy direction: a two-tiered location system 5
will be established, with Waterfront Park and Marina Park designated as Tier 1 (premium locations), 6
and the sports complex, dog park, and bike path/trails designated as Tier 2. Pebble Beach will be 7
explicitly excluded as an approved bench location. The renewal responsibility rests with the 8
applicant, with no staff obligation to initiate outreach. The full policy, including costs, tiered 9
structure, and updated language, will be brought back for formal adoption at the June meeting. 10
Additionally, the committee directed staff to draft communications for current bench holders whose 11
agreements may have expired, and to utilize email where available. Staff will also consult the Sister 12
Bay GIS inventory to confirm the total number of active benches. 13
14
c. Memorial Bench Submission for Review — Janko Family 15
The committee determined that the Janko family submission, along with other outstanding 16
applications, will be reviewed after the updated Memorial Bench Policy is formally adopted at the 17
June meeting. 18
19
d. DNR Encumbrance Update 20
Andrews reported that the DNR has confirmed the revised appraisal is acceptable. The encumbrance 21
resolution requires a land swap of approximately 0.6 acres valued at $549,000, which should 22
preferably serve users of Waterfront Park. 23
Two potential replacement parcels were discussed: the parcel currently occupied by the 24
administration building (contingent on the Triangle Road project proceeding), and a portion of 25
Marina Park to the north of the marina. The committee directed Andrews to investigate both 26
options, confirm eligibility and acceptability with the DNR, and return with a recommendation. An 27
appraisal of the selected parcel will follow. 28
29
e. Schedule Walking Tour and Tree Placement – May 2026 30
The committee addressed two components of this item separately. 31
Regarding tree placement, Ahrens indicated he did not believe a walking tour was necessary to 32
approve the four proposed tree locations as marked in the packet — two Burr Oaks and two Autumn 33
Blazes — to be planted in front of Al Johnson's parking lot area along the waterfront. 34
Motion to approve the tree placement locations as identified on page 27 of the packet, consisting of 35
Burr Oak and Autumn Blaze plantings, was made by Ahrens and second by Bell. Motion carried — all 36
ayes. 37
Regarding the walking tour, the committee agreed to postpone it until August to allow time for 38
recently approved plantings and improvements to develop, and to await the filling of the vacant 39
trustee seat. A date will be confirmed at a future meeting. The tour will be informational in nature, 40
with any action items to be brought forward at a subsequent regular meeting. The sports complex 41
area, including the dog park and parks building, was identified as the preferred tour focus. 42
43
6. Executive Session 44
Motion to suspend the rules and move Item 6a to the end of the agenda was made by Laszkiewicz 45
and second by Ahrens. Motion carried — all ayes. 46
Item reordered — see below following Item 9. 47
48
7. Staff Report, Board Update 49
Linczmaier reported on several operational matters. Street sweeping following the winter season 50
was noted by Howson as significantly improved over the prior year, attributed in part to a heavier-51
3
Minutes of the May 4, 2026, meeting of the Parks, Property & Streets Committee – unapproved
3
than-usual sand application due to the severe winter. The railing installation along the waterfront 1
steps was noted as a welcome improvement. 2
Linczmaier updated the committee on a recently completed mezzanine addition at the parks shop 3
building, providing needed overhead storage. It was noted this was an oversight from the original 4
construction and should not require further additions. 5
Linczmaier provided an update on the gazebo project, noting a minor budget overage that will be 6
offset against future Municipal Reimbursement Fund (MRF) allocations. Staff will ensure the Finance 7
Committee is informed. 8
Regarding drainage on South Spring Road, Linczmaier reported that a resident discovered and 9
cleared a previously unknown culvert near the roadway, which resolved significant standing water. 10
Staff will ensure the culvert is entered into the GIS system and added to the maintenance schedule. 11
The county will still be consulted regarding additional ditch grading. 12
A resident of Woodcrest Village addressed the committee, noting that water levels in the adjacent 13
wetlands reached historically high levels this season, with concern about water approaching 14
residential buildings. The resident asked that any drainage improvements on South Spring Road not 15
worsen conditions in the wetland area. The committee and staff acknowledged the concern and 16
noted it will be considered in any future drainage work. 17
18
8. Matters to be Placed on a Future Agenda or Referred to a Committee, Official or Employee 19
The following items were identified for future agendas: 20
-Howson suggested inviting a Frontier Communications representative to provide a broadband 21
service update, including coverage progress within village boundaries. The committee agreed this 22
would be appropriate for a future Parks Committee meeting. 23
-Bell requested that staff compile a report on the current condition of the Logerquist property, 24
including a summary of prior work completed and options for an appropriate inspection, in advance 25
of a broader discussion on the property's intended use and any associated investment. Linczmaier 26
noted for the record that the barn on the property is still used intermittently by village crews for 27
overflow storage, and that clean, empty buckets associated with the village's new composting 28
program are being stored in a shed adjacent to the home. The committee acknowledged these 29
operational considerations would need to be factored into any future plans for the property. Staff 30
acknowledged the request and will prepare materials for the June meeting. 31
32
9. Next Regular Meeting June 1, 2026 at 1:00 PM 33
The next regular meeting of the Parks, Property & Streets Committee was confirmed for Monday, 34
June 1, 2026 at 1:00 PM. 35
36
6. Executive Session 37
a. Fiber Optic Discussion 38
39
Pursuant to Wis. Stats. §19.85(1)(g) — to confer with legal counsel for the governmental body who is 40
rendering oral or written advice concerning strategy to be adopted by the body with respect to 41
litigation in which it is or is likely to become involved. 42
Motion to convene into closed session was made by Bell and second by Ahrens. Motion carried by roll 43
call vote: Aye: Howson, Bell, Ahrens, Laszkiewicz. 44
45
10. Adjourn 46
Motion by Laszkiewicz, second by Ahrens to adjourn the meeting in executive session at 2:49 PM. 47
Motion carried all - ayes. 48
49
Respectfully submitted by Sarah Bertges, Administrative Assistant. 50
4
1
Ben Andrews
From: Sarah Bertges <adminassist@sisterbaywi.gov>
Sent: Tuesday, May 26, 2026 2:53 PM
To: Louise Howson
Cc: Ben Andrews
Subject: Flower Pot Angel Letter Attached
Attachments: SKM_C450i26052614390.pdf
Hello Louise,
I received the attached letter 5/21/2026 from Sharon of The Flower Pot Angels. Thought you would like to
be kept in the loop.
Sarah Bertges
Administrative Assistant
Village of Sister Bay
PO Box 769
Sister Bay, WI 54234
(920) 854-4118
adminassist@sisterbaywi.gov
Population 1205 (per 2024 DOA estimate)
NEW Office Hours:
Monday – Thursday 8:00 AM – 4:00 PM
Friday 8:00 AM – 12:00 PM
(Fridays immediately preceding an election will be open until 5:00 PM for voter registration)
5
6
Page 1
STAFF REPORT
Date: June 1, 2026
To: Parks, Property and Streets Committee (“Parks Committee”)
Re: Memorial Bench Policy Review
Author(s): Benjamin Andrews, Village Administrator
Action(s) Requested: ☐ Ordinance ☐ Resolution ☐ Motion ☒ Receive/File
PRIOR ACTION/REVIEW
Recent Parks Committee meetings included extensive discussion on the Memorial Bench
Program, the pending bench requests, and the need to review and update the existing policy.
From the November 3, 2025 , Parks Committee meeting: The Committee voted to enact a
moratorium on accepting new bench applications until the policy is reviewed, a working GIS map
of all bench locations is completed, the waiting list is updated, and two outstanding bench
requests remain postponed.
From the December 1, 2025, Parks Committee meeting: The Committee reviewed the existing
policy, noting the current moratorium and the two pending applications. New GIS mapping has
been completed and displays existing benches. Discussion topics included: updating bench
pricing to reflect actual costs, evaluating whether “historical significance” should remain a
requirement, considering a tiered location system (prime waterfront vs. other park locations),
and potential new bench locations along the future Highway 57 Trail. Staff was directed to gather
current bench cost information and potential new materials or frame styles.
At the April 6, 2026 , Parks Committee meeting, staff presented an updated cost analysis
demonstrating that the actual cost to install a memorial bench average $4,781, significantly
higher than the existing $1,000 donation rate. Committee members discussed whether future
pricing should aim for full cost recovery or continue to treat the program as a partially subsidized
community service. They also requested tha t staff explore outsourcing the routing work and
consider alternative fabrication methods to reduce labor demands.
7
Page 2
The Committee held further discussion on establishing a tiered system for bench placement,
maintaining stricter eligibility criteria for high ‑demand waterfront locations such as Waterfront
Park and Marina Park, while allowing more accessible placement standards in secondary
locations, including the Sports Complex, Dog Park, and Bike Path. Finally, the Committee reached
consensus to revise the renewal process so that responsibility for renewal inquiries and the
continuation of terms would rest with the memorial sponsors rather than with Village staff.
Based on the Parks Committee’s May 4, 2026 discussion, staff have updated the draft Memorial
Bench Policy to incorporate the tiered location system previously supported by the Committee,
including designation of Waterfront Park and Marina Park as Tier 1 locations and the Sports
Complex, Dog Park, and Bike Path/Trails as Tier 2 locations. Pebble Beach remains excluded from
both tiers.
FINANCIAL INFORMATION
PREVIOUS INFORMATION: Committee request, total cost to construct memorial benches at
staff’s charge-out rate 2026 year: Total cost $4,781 compared to hourly rate $2,941.62.
UPDATE: Erik is working with a contractor to obtain additional information, which will assist the
committee with making a decision regarding the price of the memorial bench. While preliminary
information has been reviewed in earlier meetings, the updated cost estimate —necessary for
establishing the final bench prices for both tiers—has not yet been provided from the contractor
as anticipated . Staff expect to receive this information prior to the next Parks Committee
meeting.
ATTACHMENT(S)
1. Commemorative Bench Program Policy and Donation Agreement (DRAFT-June 2026)
8
1
Village of Sister Bay
Commemorative Bench Program Policy
and Donation Agreement (DRAFT)
(Approved by the Village Board on [Date])
Policy Purpose: It is the policy of the Village of Sister Bay to accept donations for the purpose of
installing commemorative benche s within Village parks and pub lic spaces to honor someone
special, remember a loved one, or recognize a special event or achievement. Benches placed in
Tier 1 locations (Waterfront Park & Marina and Marina Park) must meet a heightened threshold
of historical significance to the Village of Sister Bay. Bench placements in Tier 2 locations (Sports
Complex, Dog Park, Bike Path and Trails) may meet less stringent requirements. Benches that
commemorate significant events in Village histor y will be determined by the Village Board with
assistance from the Sister Bay Historical Society.
Donation Purpose: Donations will be accepted only for the purchase and installation of park
benches approved by the Village of Sister Bay.
Tier 1 Policy Statements:
1. Individuals that wish to be commemorated wi th a physical memorial must have a direct
affiliation with, or have lived in, the Village of Sister Bay and have made significant
contributions to our community . Memorials need to reflec t the Village's “culture” and
recognize the person's overall historical significance. Memorials need to “tell the story” of
the Village of Sister Bay.
2. Donors will submit a written statement outlining the connection between their honoree and
the Village of Sister Bay, in alignment with the Tier 1 purpose.
3. The location of Tier 1 memorial benches shall be sited according to the master plan layout of
the Village parks and public spaces. The approved spaces include:
a) Waterfront Park
b) Marina and Marina Park
*Pebble Beach is not an approved location for either tier 1 or 2.
4. Cost of a memorial bench shall be $[Price] (T ier 1) which includes all materials, labor, and
installation, along with any necessary maintenance endowment.
9
2
Tier 2 Policy Statements:
1. The commemorative bench program applies broade r, more inclusive criteria that still align
with the policy requirement for honorees to have a connection to Sister Bay, but do not
require significant historical impact. Standards can include:
a. Honorees who lived in or were affiliated with the Village of Sister Bay, even if their
contributions were personal, informa l, or community-oriented rather than
historically impactful.
b. Individuals who provided service, volunt eerism, or positive engagement in the
community, regardless of scale.
c. Residents or community members whose presence or everyday contributions
enriched the community in meaningful, but not historically defining, ways.
d. Persons remembered primarily for family, personal, or neighborhood connections
within Sister Bay.
2. Donors will submit a written statement outlining the connection between their honoree
and the Village of Sister Bay, in alignment with the Tier 2 purpose.
3. The location of Tier 2 memorial benches shall be sited according to the master plan layout of
the Village parks and public spaces. The approved spaces include:
c) Sports Complex
d) Dog Park
e) Bike Path and Trails
*Pebble Beach is not an approved location for either Tier 1 or 2.
4. Cost of a memorial bench shall be $[Price] (T ier 2) which includes all materials, labor, and
installation, along with any necessary maintenance endowment.
10
3
General Policy Statements:
5. The Parks, Property, and Streets Committee will have final approval of requested memorials
and the location of placement. The policy will be implemented by Village Staff.
6. Once donated, the memorial becomes the property of the Village, and it is prohibited for donors to
decorate or add adornment to the memorial item.
7. Commemorative benches shall be constructed of wood with a metal frame and placed on
concrete slabs where necessary. The commemoration statement will be routed directly on
the bench.
8. The wording on the memorial will be limited to
a) In memory of …
b) In honor of …
9. A commemorative bench will remain in place for a term of ten (10) years from installation. At
the conclusion of the term, the memorial sponsor is responsible for contacting the Village if
they wish to renew their agreement. As of the adoption of this polic y, the Village will no
longer initiate renewal notifi cations. The renewal fee will be the current program rate
established by the Village at the time of renewal. Renewal reauthorizes the bench for an
additional ten (10) years; the Village does no t guarantee the condition or location of the
existing bench at the time of renewal. If no renewal request is received by the expiration date,
the Village may remove, relocate, or offer the bench location to a new donor.
10. Donors must enter into a written donation agreement with the Village (attached). This
document will specify the terms of any gift , which may include provisions regarding
maintenance, life span, and donor recognition.
11. This policy will be reviewed annually and updated as necessary.
12. The master plan of public parks and public spaces will be reviewed and updated as necessary.
11
4
Commemorative Bench Program Donation Agreement
Please complete this application to donate a park bench to the Village of Sister. Village staff will contact
you regarding acceptance of your application and placement of your memorial.
I wish to donate a memorial park bench IN MEMORY OF IN HONOR OF (check one)
(limit of 23 characters including spaces)
Donor Name: __________________________________________________________________
Address: ______________________________________________________________________
City, State, Zip:__________________________________________________________________
Email: _____________________________________________ Phone:_____________________
Alternate Contact Name: _________________________________________________________
Alternate Contact Address: _______________________________________________________
City, State, Zip:__________________________________________________________________
Email: _____________________________________________ Phone:_____________________
Desired location for placement of memorial:
Tier 1 ($[Price])
☐ Waterfront Park
☐ Marina and Marina Park
Tier 2 ($[Price])
☐ Sports Complex
☐ Dog Park
☐ Bike Path and Trails
Enclosed is a fee for a park bench payable by ch e c k t o V I L L A G E O F S I S T E R B A Y . I h a v e a l s o
attached a written statement (see back of form), which will be edited by village staff and posted
on the village’s website.
Completed form and payment can be mailed to PO BOX 769, Sister Bay, WI 54234. Questions on
completion of this form can be directed to staff at (920) 854-4118 or email info@sisterbaywi.gov.
I acknowledge that a monetary donation is being offere d to support Village of Sister Bay parks. I agree
that I have read the entire Commemorative Bench Program Policy and understand the terms and
conditions under which I am making this request. With this donation, the Village of Sister Bay will install
a commemorative park bench for a period of 10 years engraved with the name of the designated honoree
indicated above. After 10 years, the bench may be removed or refurbished with a future donation. I also
grant permission for the Village of Sister Bay to compile and share the written statement about the
honoree submitted with this request on their website for the public to enjoy.
______________________________________ ______ ______________
Signature Date
12
5
Commemorative Bench Program Honoree Details
Want to remember an individual important to the area? Consider the following questions
when creating your statement about your family member and/or loved one:
While residing in the Village:
*where were they employed or did they own their own business
*did this person serve on any project committees
*did this person conduct any volunteer service in the village
*list any other significant contributions to Sister Bay
Statements need not be overly long. Village staff will contact you at the email or number
provided on the reverse of this form if clarification is needed.
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
13
Page 1
STAFF REPORT
Date: June 1, 2026
To: Parks, Property and Streets Committee
Re: Memorial Bench Submissions for Review
Author(s): Benjamin Andrews, Village Administrator
Action(s) Requested: ☐ Ordinance ☐ Resolution ☒ Motion ☒ Receive/File
POLICY ISSUE(S)
“Should the Parks Committee approve the requests for memorial benches under the
Commemorative Bench Program Policy.”
BACKGROUND INFORMATION
The Village received a memorial bench application:
1. Winn Family Memorial Bench Application 9-19-2025
2. Strang Family Memorial Bench Application 8-18-2025
3. Memorial Bench Submission for Review- Janko Family 4-27-2026
4. Rafferty Family Memorial Bench Application 5-7-2026
. The request includes:
• A proposed bench inscription in memory/honor of an individual (exact text submitted in
application).
• A written statement describing the honoree’s connection to the Village, as required by
the policy.
Under the Village’s Commemorative Bench Program Policy, memorials must meet several
criteria:
1. The honoree must have direct affiliation with or have lived in the Village of Sister Bay and
have made significant contributions to the community. Memorials must reflect Village
culture and history.
2. Donors must submit a written statement outlining the honoree’s connection; staff may
edit for clarity or length. These statements are posted on the Village website.
3. The Parks, Property & Streets Committee and/or Village staff have final approval on the
memorial and location.
14
Page 2
4. Only Village ‑approved bench models and installation methods may be used, and the
commemoration wording must be within “In Memory of …” or “In Honor of …”
The Committee’s role is to determine whether the memorial meets the policy criteria related to
the honoree’s connection, contributions, and suitability within the Village’s cultural and historical
context.
ACTION(S)
Village Staff recommend reviewing the submission with the Committee, and determining if the
approval meets the following:
• The honoree’s contributions, as described in the written statement, meet the policy
requirement of significant affiliation and contribution to Sister Bay, and
• The requested bench location is consistent with the approved sitting areas in the policy.
It would be desirable for each of the applications to have a decision made independently.
If the Committee is in favor, the following motion may be made:
“I move to conditionally approve the memorial bench request submitted by the ___________
Family, with final placement and acceptance contingent upon the applicant’s compliance with
the forthcoming revised Commemorative Bench Program Policy.”
POLICY ALTERNATIVE(S)
The Parks could take the following actions:
• Approve (Conditional)
• Approve (As Presented)
• Deny
• Postpone
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
STAFF REPORT
Date: May 4, 2026
To: Parks, Property and Streets Committee
Re: Knowles-Nelson Stewardship Program; Encumbrance Resolution Options;
Author(s): Benjamin Andrews, Village Administrator
Action(s) Requested: ☐ Ordinance ☐ Resolution ☒ Motion ☒ Receive/File
BACKGROUND INFORMATION
In 2011, the Village received a $1.4 million Knowles-Nelson Stewardship grant to acquire land for
Waterfront Park. In 2015, the grant agreement was amended to allow the creation of parking
along the highway near the park, reducing the park size by 0.063 acres. The lost land was replaced
with 0.6 acres at the Marketplace Parking Lot, which became encumbered by grant restrictions
requiring public access. Later, the Village approved a Development Agreement with The Dorr
Hotel, granting exclusive use of some Marketplace lot stalls, violating the grant terms.
Village Staff contracted professional appraisal services for an appraisal report for the real estate
property (Lot 11, Mill Road). According to the appraisal report, the property’s market value is
$549,000.
The DNR reviewed the appraisal report and indicated it was acceptable for use.
The next step in the process is to determine potential replacement land that meets the DNR’s
conditions. The Parks Committee was provided with an update on May 4 th, 2026, and was
provided with the opportunity to identify potential sites. Two options were identified:
1. Marina Park (Portion North of Marina)
2. Parking Parcels – Current Administration Building
DETERMINATION
Village Staff met wit h the DNR to discuss the
options identified by the committee:
Marina Park: The parcel is currently encumbered
and would not be considered a viable option.
30
Parking Parcels: This would be considered a viable option; however, the site is only 0.24 acres,
which would not meet the 0.60 acres required to meet the encumbrance. This site would need
to be “bundled” with another site.
Another option was identified during the conversation:
Portions of Waterfront Park:
The DNR discussed using the remaining
portion of waterfront park to be
encumbered. This would include
multiple parce ls along the Marina are a
as identified on the map:
Parcels:
1810005312841L 0.220 acres
1810005312841L1 0.150 acres
1810005312841M 0.140 acres
1810005312841M1 0.180 acres
TOTAL (Approx.) 0.690 acres
Current DNR Encumbered Areas
The parcels would be ideal because the value is likely higher than the $549,000 necessary and is
greater than 0.60 acres. It is important to note that the area would need to remain as its current
use in perpetuity.
NEXT STEPS
The Parks Committee is encouraged to identify a site to move forward on and obtain a
survey/appraisal to identify the area/value . If the criteria are met as a result, the DNR would
initiate a grant agreement amendment to exchange the existing area and move the encumbrance
to a new site.
ATTACHMENT(S)
1. Email from DNR
31
From: Roffler, Luke S - DNR
To: Ben Andrews
Cc: Louise Howson
Subject: RE: DNR Encumbrance - Village of Sister Bay
Date: Monday, May 18, 2026 12:51:08 PM
Attachments: image001.png
image002.png
image003.png
image004.png
image005.png
image006.png
Ben,
Thanks for sending this. Do you want to propose a few dates/times that work for you to discuss over a
virtual meeting? Thanks.
Luke S. Roffler
Grant Manager, Knowles-Nelson Stewardship Program / LWCF / NCWC
Wisconsin Department of Natural Resources
141 NW Barstow Street
Waukesha, WI 53188
(608)294-8017
luke.roffler@wisconsin.gov
dnr.wi.gov
Our core values include professionalism, integrity, and customer service.
Please visit our survey
to provide feedback on your experience interacting with any DNR employee.
From: Ben Andrews <administrator@sisterbaywi.gov>
Sent: Tuesday, May 5, 2026 11:28 AM
To: Roffler, Luke S - DNR <luke.roffler@wisconsin.gov>
Cc: Louise Howson <louise.howson@sisterbaywi.gov>
Subject: DNR Encumbrance - Village of Sister Bay
CAUTION: This email originated from outside the organization.
Do not click links or open attachments unless you recognize the sender and know the content is
safe.
Hello Luke,
Thanks for confirming earlier next month that the appraisal was appropriate. The Village’s
appropriate committee met and discussed the next steps. The Village would like to explore two
potential locations as suitable replacements:
32
#1 Marina Park – located adjacent to Waterfront Park. The parcel of Marina Park that is
proposed is .0670 acres and is 950 ft away (aerial) from Waterfront Park. The park is primarily
open space. An appraisal has not been conducted to determine a value.
#2 Former Administrative Building
(to be turned into Park) – This site is proposed to have 31
parking stalls and a green space. The site is 0.24 acres, and the current use has an appraisal of
$248K. The change to parking may change the appraisal value of this site. I understand this is a
small parcel and would potentially need to be combined with another replacement parcel to
meet the requirements. Regardless, we wanted to check whether this was potentially eligible.
Feel free to review. We would also be interested in setting up another time to briefly meet
regarding the findings.
Regards,
Benjamin Andrews
Village Administrator/Zoning Administrator
Village of Sister Bay
PO Box 769
Sister Bay, WI
54234
administrator@sisterbaywi.gov
From: Roffler, Luke S - DNR <luke.roffler@wisconsin.gov>
Sent: Thursday, April 9, 2026 10:05 AM
To: Ben Andrews <administrator@sisterbaywi.gov>
Cc: Louise Howson <louise.howson@sisterbaywi.gov>
Subject: RE: SISTER BAY PARKING LOT UPDATE
Ben,
Good news, the appraisal has been reviewed and accepted for use. The revised report only includes Lot
11, which is the parcel with KN-Stewardship encumbrance. I can’t speak to whether the Village will want
to move on from the larger parking lot.
As far as the KNS conversion goes, the Village will need to find a suitable replacement parcel that meets
or exceeds the following:
Acreage: 0.60 acres
Appraised value: $549,000
Recreational utility
Preferably a parcel that serves the users of Waterfront Park, which is where the original
33
KNS conversion occurred.
Preferably a parcel that replaces the lost parking stalls at Lot 11.
Happy to jump on a call to talk through possible replacement parcels when you’re ready. Let me know if
you have any additional questions. Thank you.
Luke S. Roffler
Grant Manager, Knowles-Nelson Stewardship Program / LWCF
Wisconsin Department of Natural Resources
141 NW Barstow Street
Waukesha, WI 53188
(608)294-8017
luke.roffler@wisconsin.gov
dnr.wi.gov
Our core values include professionalism, integrity, and customer service.
Please visit our survey
to provide feedback on your experience interacting with any DNR employee.
From: Roffler, Luke S - DNR
Sent: Monday, March 30, 2026 11:06 AM
To: 'Ben Andrews' <administrator@sisterbaywi.gov>
Cc: Louise Howson <louise.howson@sisterbaywi.gov>; kevin@dummanappraisals.com
Subject: RE: SISTER BAY PARKING LOT UPDATE
Thanks Ben. I will get this on the stack for review and reconnect when I hear back.
Luke S. Roffler
Grant Manager, Knowles-Nelson Stewardship Program / LWCF
Wisconsin Department of Natural Resources
141 NW Barstow Street
Waukesha, WI 53188
(608)294-8017
luke.roffler@wisconsin.gov
dnr.wi.gov
Our core values include professionalism, integrity, and customer service.
Please visit our survey
to provide feedback on your experience interacting with any DNR employee.
From: Ben Andrews <administrator@sisterbaywi.gov>
Sent: Friday, March 27, 2026 2:04 PM
To: Roffler, Luke S - DNR <luke.roffler@wisconsin.gov>
Cc: Louise Howson <louise.howson@sisterbaywi.gov>; kevin@dummanappraisals.com
Subject: FW: SISTER BAY PARKING LOT UPDATE
34
CAUTION: This email originated from outside the organization.
Do not click links or open attachments unless you recognize the sender and know the content is
safe.
Luke,
I received the revised appraisal report for the DNR’s encumbrance. Before presenting to the
Village’s committee, the Village is requesting that the DNR review the report and confirm that
the value identified and the methodology are accurate and will be acceptable to the DNR
before moving forward to getting the encumbrance resolved.
Please review and let me know if you would like to have a conversation over the phone if there
are any issues.
Regards,
Benjamin Andrews
Village Administrator/Zoning Administrator
Village of Sister Bay
PO Box 769
Sister Bay, WI
54234
administrator@sisterbaywi.gov
From: Janet Dumman <janet@dummanappraisals.com>
Sent: Friday, March 27, 2026 10:55 AM
To: Ben Andrews <administrator@sisterbaywi.gov>
Subject: SISTER BAY PARKING LOT UPDATE
Attached is the updated report for the parking lot (Lot 11) on Mill Road in the Village of Sister Bay.
Please look it over carefully and address any questions or comments directly to Kevin at
kevin@dummanappraisals.com or you may of course call him at the number listed below if you wish.
Thank you for allowing us to be of service to you in this matter.
Janet Dumman
Dumman Appraisal Group, LLC
923 Lake Street – P.O. Box 65
Algoma, WI
54201-0065
35
Phone 920-487-2345
Email janet@dummanappraisals.com
36
Page 1
STAFF REPORT
Date: June 1, 2026
To: Parks, Property and Streets Committee
Re: HWY 57 Trail – DOT Concerns
Author(s): Benjamin Andrews, Village Administrator
Action(s) Requested: ☐ Ordinance ☐ Resolution ☒ Motion ☐ Receive/File
POLICY ISSUE(S)
“Should the Parks Committee provide direction to Village Staff and REL on which design option
to pursue in response to WisDOT’s “Clear Zone” concerns for the STH 57 Trail Project?”
BACKGROUND INFORMATION
Village Administrator Benjamin Andrews and Parks Committee Chairperson Louise Howsen met
with representatives from Robert E. Lee & Associates (REL) to discuss recent correspondence
from WisDOT regarding ongoing “Clear Zone Concerns” for the STH 57 Trail project.
WisDOT has indicated that portions of the proposed trail may fall within the required safety clear
zone adjacent to STH 57, and that this may necessitate either design changes or additional real
estate acquisition.
The DOT indicated that this is due to the vehicle incidents (“runoffs”) that occurred within the
area, which is why the DOT is not using the standard that would normally be applied.
REL and Village staff reviewed potential options to address these concerns. Below is a high-level
summary of each option:
1. WisDOT Option – Maintain Full Clear Zone Compliance
WisDOT has repeatedly stated that any segment of the trail located within the clear zone is
unacceptable and may require relocation. If the trail must be moved farther from the roadway
to meet clear zone requirements, the Village would need to purchase add itional right-of-way.
This option requires additional real estate acquisition —more than originally anticipated —and
would result in increased project cost.
37
Page 2
2. Urbanization of West Shoulder
REL presented an alternative solution that would eliminate the clear zone conflict by urbanizing
the west shoulder from Northwoods to Gatewood Drive. In this context, “urbanization” refers to
the installation of curb and gutter, thereby changing the roadway classification and removing the
full clear zone requirement. REL estimates this construction work at approximately $238,000.
3. No Change to Project (Maintain Existing Design)
The Village could attempt to persuade WisDOT to accept the current design without
modifications. REL and Village staff continue to assert that the design meets applicable safety
and slope requirements. However, there is no guarantee that WisDOT will accept the design as -
is, and delays or required revisions may still occur.
NEXT STEPS
The Parks Committee is asked to review these options and provide direction. Both Options 1 and
2 require additional cost —either through real estate, engineering, or construction. Once
direction is given, Village staff will communicate with REL to proceed.
ATTACHMENT(S)
1. Urbanization Cost Estimate
2. Real Estate Impact Comparison
3. Project Specifications (DRAFT)
38
OWNER Village of Sister Bay
PROJECT STH 57 - Urbanize West Shoulder
(Northwoords Dr to Gateway Dr)
DATE 4/30/2026
Item Unit Qty. Unit Price Total Price
204.0110 Removing Asphaltic Surface SY 1000 6.00$ 6,000.00$
305.0120 Base Aggregate Dense 1 1/4-Inch TON 100 20.00$ 2,000.00$
460.5224 HMA Pavement 4 LT 58-28 S TON 250 98.00$ 24,500.00$
601.0411 Concrete Curb & Gutter 30-Inch Type D LF 4500 18.00$ 81,000.00$
608.0315 Storm Sewer Pipe Reinforced Concrete Class III 15-Inch LF 375 90.00$ 33,750.00$
608.0318 Storm Sewer Pipe Reinforced Concrete Class III 18-Inch LF 400 95.00$ 38,000.00$
611.0624 Inlet Covers Type H EACH 15 750.00$ 11,250.00$
611.2004 Manholes 4-FT Diamter EACH 1 4,000.00$ 4,000.00$
611.3230 Inlets 2x3-FT EACH 15 2,500.00$ 37,500.00$
SUBTOTAL 238,000.00$
TOTAL CONSTRUCTION 238,000.00$
TOTAL 238,000.00$
STh 57 - Urbanize West Shoulder
(Northwoods Dr to Gatewood Dr)
\\fs1\cadsurv\0200\0282\0282223\WisDOT\Design\QuantityEstimate\STH 57 Urbanization Estimate - WISDOT Bid Items
39
STH 57 Trail Right of Way Impacts Comparison
Village of Sister Bay
FEE 0.090 acres
TLE 0.824 acres
FEE 0.667 acres
TLE 1.894 acres
Urbanized Impacts, trail 5 feet behind curb
Non-urbanized Impacts, trail shifted outside clear zone
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
Page 1
STAFF REPORT
Date: June 1, 2026
To: Parks, Property and Streets Committee
Re: Logerquist Property - Vision/Maintenance for Site
Author(s): Benjamin Andrews, Village Administrator
Action(s) Requested: ☐ Ordinance ☐ Resolution ☐ Motion ☒ Receive/File
Village Staff were tasked with compiling the available documentation regarding the Logerquist
Property. There were four documents available for documentation in the file, which included:
• Documentation of Septic Maintenance on October 9th, 2025.
• Appraisal - Market Value on 10/12/2023 from Pardee Appraisal Services LLC; Estimated at
1,285,000.
• Appraisal - Property Appraisal on 09/21/2023 for White Housing along County Hwy ZZ from
Norther Door Appraisal Services, LLC; Estimated at $872,000.
• Appraisal - Property Appraisal on 09/21/2023 for Red House along County Hwy ZZ from
Norther Door Appraisal Services, LLC; Estimated at $25,000.
Photos of the exterior of the site are included as part of the packet.
Previously Erik put together some brief information regarding the status of the maintenance on
the site:
Hi Ben,
The Logerquist property has 13 structures. Three of these structures, chicken coop, well
shed and washhouse are in rough shape. These building will need more then a coat of
paint and new roof. They have structural damage and may have to come down or be
rebuilt. The other buildings on the property will need landscaping, window work, paint
jobs, new roofing, and minor siding repair. The goal would be to work on one building a
year. Start by identifying what sta ff can and can’t do. If something is identified past the
skill set of staff, then a professional concentrator will be hired to perform the work.
Further, there are a number of inspection services that were researched and could be contracted
to provide an in-depth inspection report for the property if the future use of the property would
require it. This may be a few thou sand dollars for an exten sive report based on the property ’s
structure and square footage.
69
Page 2
70
Page 3
71
Page 4
72
Page 5
73
Page 6
74
Page 7
75
Page 8
76
Page 9
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
Page 1
STAFF REPORT
Date: June 1, 2026
To: Parks, Property and Streets Committee
Re: Cold Storage Procurement
Author(s): Benjamin Andrews, Village Administrator
Action(s) Requested: ☐ Ordinance ☐ Resolution ☐ Motion ☒ Receive/File
BACKGROUND INFORMATION
At the direction of the Parks Committee, Village Staff conducted procur ement efforts for the
Village of Sister Bay Co ld Storage Building . The issuance date was April 13 th, 2026 and the
deadline for submission was May 15th, 2026.
Two submissions were received.
• TK Desing Build Inc. includes the full services for their bid.
• Holden Shirey includes the roofing and soffit paining services in their bid.
TK Design Build Inc Holden Shirey
Base Bid – Roofing & Soffit Painting $35,100.00 $26,965.00
Alternative Smart Siding Replacement
$171,350.00
N/A
Alternative T1-11 Refurbishment N/A
Alternative - Bus Carport Addition $40,000.00 N/A
140
Page 2
PRIOR ACTION/REVIEW
PARKS, PROPERTY & STREETS COMMITTEE MINUTES
MONDAY, MARCH 2, 2026
(Approved)
5c. Cold Storage Cost Estimates
Linczmaier introduced Terry Hackl from TK Builders and Design, who presented cost estimates for
cold storage building repairs. Hackl explained he had been working with Linczmaier for
approximately six months after most local contractors were unresponsive to estimate requests.
Hackl presented two estimate options: one using existing T1-11 siding material and another using
SmartSiding. The current T1-11 siding is failing due to improper installation with horizontal framing
and vertical panel placement, causing warping and leaks. For the T1-11 option, Hackl would add
vertical supports at every seam, pre-stain material, and provide proper board installation against
concrete to prevent moisture wicking.
The SmartSiding option includes removing old sheeting, installing 7/16" OSB, and applying
SmartSiding with 30-year warranty and 50-year product life. This maintenance-free option costs
more initially but eliminates future staining requirements. The T1-11 option would need re-staining
every 3-5 years after initial application.
Both estimates include roof replacement with 30-year dimensional shingles due to severe curling and
deterioration. A carport addition for the shuttle bus was included as a cost-plus allowance pending
engineering requirements, as the current 13-foot eave height prevents a lean-to design that would
accommodate the bus height.
Budget discussion revealed approximately $36,000 remains available after $250,000 was spent on
sewer lines for the new parks building. Estimates range from $217,000-$271,000, significantly
exceeding available funds.
Committee members debated project timing and scope. Bell suggested completing only the roof this
year and deferring siding to future budget cycles. Laszkiewicz emphasized the need for competitive
bidding per procurement requirements for projects exceeding $25,000 and questioned whether the
full scope is necessary given the new large parks building.
Bhirdo argued against piecemealing the project, noting the village has $2 million in undesignated
funds available and stressing the importance of completing the bus carport as originally planned with
the concrete pad extension. She advocated for using undesignated funds to complete the entire
project.
Andrews clarified that any work over $25,000 requires competitive bidding processes. After
extensive discussion about budget implications and project prioritization, the committee reached
consensus to pursue competitive bids for roofing and soffit painting, with carport design
modifications to maintain roof continuity while potentially lowering the addition to accommodate
future construction.
Consensus was reached to direct staff to seek competitive quotes for roof replacement and soffit
painting, with carport design considerations for future implementation.
141
Page 3
RECOMMENDED ACTION(S)
Village staff recommends the Parks Committee Evaluate the bids and services based on the bid
submissions and consider if the Committee would be seeking to make a recommendation to the
Village Board.
POLICY ALTERNATIVE(S)
The Parks Committee could take the following actions:
• Make Recommendation to Village Board
• Seek Additional Information - Postpone
• Reject Bids
ATTACHMENT(S)
1. Simplified Invitation to Bid
2. Procurement Documents
a. TK Design Build Inc
b. Holden Shirey
142
Page 1
Village of Sister Bay
Simplified Invitation to Bid
Cold Storage Building
The Village of Sister Bay (“Village”) seeks a quali fied contractor to perform improvements to the Cold Storage
Building, with a base scope of roof replacement and so Ưit painting, and optional bid alternates for siding
replacement and a shuttle bus carport addition (subject to design/engineering). This re flects the Parks,
Property & Streets Committee’s consensus to proceed with competitive bids for roof replacement and so Ưit
painting, while considering carport design to maintain roof continuity for future implementation.
Project Summary
Project: Cold Storage Building Improvements — R oofing & Soffit Painting (with Alternates)
Issue Date: 4/13/2026
Bid Due: 5/15/2026, 12:00 P.M.
Committee Review: 6/1/2026
Deliver To:
a. If Physically: Mail/Drop Off to Village of Sister Bay, 2383 Maple Drive, Sister Bay, WI 54234
b. If Electronically: Submit via email to erik.linczmaier@sisterbaywi.gov
Project Manager: Erik Linczmaier, Parks and Street Director, 920-421-3200.
143
Village of Sister Bay
Simplified Invitation to Bid
Cold Storage Building
Page 2
Procurement Method
This procurement is issued in accordance with the Village’s procurement policy and Wisconsin public
construction requirements. Competitive bidding is required for work expected to exceed $25,000. Bids will be
solicited, publicly received, and awarded to the lo west responsible bidder, considering responsiveness,
competence, schedule, and price.
Scope of Work
Base Bid (Required):
Roof Replacement
• Remove existing roofing down to the deck; inspect the decking; replace damaged/rotted sheathing.
• Install 30-year dimensional asphalt shingles (or approved equal).
• New underlayment, ice/water shield per code, flashing, ridge vents, and accessories.
• Coordinate with existing roof geometry to preserve continuity for potential future carport addition (no
structural carport work in Base Bid).
Soffit Preparation & Painting
• Clean, prep, scrape, and prime soffits; apply finish coats per manufacturer specs.
• Color to be selected by Owner; include mock-ups and one (1) color change allowance.
Bid Alternates (Provide Separate Prices):
Alternate 1 — Siding Replacement (SmartSiding system): Remove failing siding; install 7/16" OSB
sheathing; furnish and install SmartSiding (manufacturer’s 30-year warranty/50-year product life);
trim and sealants; include scaffolding, WRB, flashings, and standard accessories.
Alternate 2 — Siding Refurbishment (T1-11 approach): Add vertical supports at seams; pre-stain
material; correct interface at concrete to prevent moisture wicking; complete installation per best
practice; note ongoing maintenance (re-staining 3–5 years).
Alternate 3 — Shuttle Bus Carport Ad dition (Allowance/Design-Dependent): Price an engineered
carport solution compatible with existing ~13-ft eave height constraints; include conceptual
allowance pending engineering and permitting; propose options that maintain roof continuity with
main structure.
144
Village of Sister Bay
Simplified Invitation to Bid
Cold Storage Building
Page 3
Owner’s Budget:
Committee discussion noted available funds and estimated costs ranging $200,000–$275,000, which exceed
current available allocations; alternates may be exercised based on funding. (Budget figures are informational
only; award will be based on bid prices and Village discretion.)
Site Location
Facility: Cold Storage Building
Address: 2160 Autumn Court, Sister Bay, WI 54234
Access: Coordinate with the Project Manager for the site walk-through (if requested)
Schedule
• Site Walk-through (Optional): Until 5/8/2026
• Bid Due: 5/15/2026, 12:00 P.M.
• Parks, Property, and Streets Committee Review: 6/1/2026
• Village Board Review and Potential Award: 6/16/2026
Minimum Qualifications
• Active Wisconsin contractor license(s) as applicable.
• Demonstrated experience with municipal roofing and building envelope projects of similar scale within
the past five (5) years.
• Ability to meet insurance and bonding requirements.
Instructions to Bidders
1. Bid Format: Submit one (1) signed Bid Form via the delive ry methods. Clearly mark with “Cold Storage
Building Improvements Bid” and Bidder name.
2. Inquiries: Questions regarding the procurement and project are to be submitted to the Project Manager
by the deadline.
3. Site Visit: Bidders are responsible for site verification of dimensions, conditions, and coordinating access
with the project manager.
4. Prevailing Wage: Not applicable to local projects.
5. Taxes: Village is exempt from Wisconsin sales tax; it includes only taxable items as required by law.
145
Village of Sister Bay
Simplified Invitation to Bid
Cold Storage Building
Page 4
Insurance & Bonds
• Commercial General Liability: $1,000,000 per occurrence / $2,000,000 aggregate.
• Automobile Liability: $1,000,000 combined single limit.
• Workers’ Compensation & Employer’s Liability: Statutory / $500,000.
• Builder’s Risk: As applicable.
• Performance & Payment Bonds: 100% of contract award (if required by Village/Statute; typically required
for municipal public works).
Evaluation & Award
The Village will evaluate bids for responsiveness and re sponsibility and may consider price reasonableness,
schedule, qualifications, references, and past performance. The Village reserves the right to:
• Waive minor informalities;
• Reject any or all bids;
• Accept any combination of Bid Alternates;
• Award to the lowest responsible bidder whose bid is most advantageous to the public interest.
This approach aligns with the Village’s emphasis on competitive bidding and scope control for this project.
Contract & Payment
• Form of Contract: Short-form public works agreement inco rporating this ITB, Contractor’s bid,
insurance/bond requirements, and standard terms.
• Payment Terms: Progress payments monthly (or milestone-based), less 5–10% retainage until
substantial completion; release upon acceptance and closeout.
• Change Orders: Written, pre-approved by the Village; unit price schedule encouraged.
Technical Standards
• Roofing: ASTM-compliant shingles; manufacturer’s installation specs; ICE dam protection per Wisconsin
Building Code; Roof sheathing replacement if necessary; ventilation per code; color selection by Owner.
• Painting: Surface prep per SSPC standards; low-VOC coatings; warranty minimum one (1) year on labor
and materials.
• Siding (Alt 1): Manufacturer’s system components; WRB; flashings; sealed penetrations; warranties
transferred to Owner.
• Siding (Alt 2): Vertical supports at seams; pre-stained panels; corrected installation at concrete interface
to avoid wicking; maintenance plan.
• Carport (Alt 3): Provide a conceptual engineered approach ac counting for ~13-ft eave height; design to
integrate with main roofline (straight across or slightly lowered) for continuity; permits and structural calcs
included in price.
146
Village of Sister Bay
Simplified Invitation to Bid
Cold Storage Building
Page 5
Bid Form:
Bidder: __________________________________________________________
Address: _________________________________________________________
Contact: _________________________________________________________
Phone: _( )________-_________
Email: ________________________________@___________________________
Base Bid — Roofing & Soffit Painting: $__________.____
Alternate 1 — SmartSiding Replacement: $__________.____
Alternate 2 — T1-11 Refurbishment: $__________.____
Alternate 3 — Bus Carport Addition (Allowance): $__________.____
TOTAL: $__________.____
Authorized Signature: _________________________________ Date: _____/______/______
Additional Attachments
• Attachment A: Detailed scope of work (SOW) showing Drawings, plans, and details that will meet the
villages specific needs. (Owner-supplied or Contractor-developed).
• Attachment B: Technical Approach, contractor will provide a description on how they will perform the
work (roofing, painting, siding, carport).
• Attachment C: Sample Contract Terms & Conditions.
• Attachment D: Wisconsin Sales Tax Exemption Certificate.
• Attachment E: Insurance & Bond Forms.
• Attachment F: Bidder’s Qualifications Form & References.
• Attachment G: Lists of subcontractors and their roles.
• Attachment H: Project schedule/ timeline (start date, deliverables, final completion date)
147
148
149
150
151
152
153
154
Commercial Contracting Company LLC
Village of Sister Bay – Cold Storage Building Improvements
Proposal / Scope of Work
Date: May 2026
Submitted To: Village of Sister Bay
Project: Cold Storage Building Improvements – Roofing & Soffit Painting
Project Address: 2160 Autumn Court, Sister Bay, WI 54234
Submitted By:
Commercial Contracting Company LLC
193 US HWY 319
Tifton, GA 31794
Contact: Holden Shirey
Email: holdenshirey@gmail.com
Base Bid Pricing
Roof Replacement
$23,246.00
Soffit Preparation & Painting
$3,719.00
Total Base Bid
$26,965.00
Scope of Work
Roofing Scope
Commercial Contracting Company LLC shall provide all labor, materials, equipment, supervision,
disposal, and incidentals necessary to complete the roofing improvements for the Village of Sister
Bay Cold Storage Building.
Work includes:
Removal of existing roofing system down to the decking.
Inspection of roof decking and replacement of damaged or deteriorated sheathing as necessary.
Installation of synthetic underlayment.
155
Installation of ice and water shield in accordance with Wisconsin building code requirements.
Installation of architectural dimensional asphalt shingles.
Installation of new flashing, ridge vent systems, drip edge, pipe boots, and roofing accessories.
Disposal and haul-off of all roofing debris.
Final cleanup of the project area.
All work shall be completed in accordance with manufacturer specifications, local building
requirements, and industry standards.
Soffit Preparation & Painting Scope
Commercial Contracting Company LLC shall provide all labor and materials necessary for soffit
preparation and painting.
Work includes:
Cleaning and preparation of soffit surfaces.
Scraping and removal of loose or failing paint.
Priming of repaired or exposed surfaces.
Application of finish coating per manufacturer specifications.
One owner-selected color allowance included.
Final cleanup of all work areas.
Technical Approach
Commercial Contracting Company LLC will coordinate scheduling, material delivery, safety
compliance, and quality control throughout the project duration. The project will be managed to
minimize disruption while maintaining a clean and safe jobsite.
Roofing work will be performed by experienced commercial roofing personnel and supervised by
project management throughout installation.
All debris will be removed daily, and final cleanup will be completed upon project completion.
Project Schedule
Estimated Start Date: July 2026 (subject to award and material availability)
Estimated Duration: 5-8 calendar days
Projected Completion: Within 10 calendar days of mobilization, weather permitting.
Project Schedule:
Mobilization and Material Delivery: Day 1
Roof Tear-Off and Deck Inspection: Days 1–2
Roofing Installation: Days 2–5
Soffit Preparation and Painting: Days 5–7
156
Final Cleanup and Punch List: Days 7-8
Workers’ Compensation Exemption Letter
Commercial Contracting Company LLC currently has no direct employees subject to workers’
compensation requirements and operates utilizing subcontracted labor.
Commercial Contracting Company LLC maintains General Liability insurance coverage and will
ensure all subcontractors maintain their own required insurance coverage during project operations.
If additional documentation is required by the Village of Sister Bay, it will be provided upon request.
Subcontractor List
Roofing Subcontractor
Epic Roofing Services Inc.
Scope of Work:
Roofing labor and installation services.
Roof tear-off and replacement.
Installation of shingles, flashing, accessories, and related roofing components.
Contractor Qualifications
Commercial Contracting Company LLC is a commercial roofing contractor experienced in roof
replacement, coatings, repairs, and exterior building improvements.
Qualifications include:
Active Wisconsin contractor licensing.
HAAG Certified Commercial Inspector certification.
ICC F-14 National Standard Roofing Contractor certification.
OSHA 30-Hour Construction Safety certification.
Experience coordinating commercial roofing and exterior improvement projects.
The company maintains commercial general liability insurance coverage and utilizes experienced
roofing subcontractors for project completion.
Signature
Submitted By: Holden Shirey
Commercial Contracting Company LLC
Holden Shirey
157
Date: 5/13/2026
158
PARKS & STREETS DIRECTOR’S REPORT
Date: June 1, 2026
Board/Committee: Parks Committee Meeting
Re: Monthly Report
Author: Erik Linczmaier, Director
1. The county came through and rolled the ball fields and dog park.
2. Bob Bultman was able to perform a control burn of the wildflowers and grass located near the
brick walking path.
3. Bridenhagen Tree & Landscape completed the committee’s municipal reimbursement project.
All ten trees were planted successfully.
4. Julie Hein, the historical Sign project creator, has completed the final draft for committee
review. This draft will be included in your packet for review. Julie is unable to attend this
159
month’s meeting, but I wanted to include a summary of her thoughts on process of the
project.
I thought it might be helpful to provide a summary on the project and the Historical
Society review process as I prepare to submit the revised final draft exhibit panels for
Village review and production approval. The Historical Society was invited to provide
factual review. I spent the last few days carefully reviewing, organizing, and processing
the narrative and feedback they provided. I then incorporated any appropriate factual
corrections, image updates, and content refinements into the exhibits where they
supported the scope and could be accommodated within the existing design structure.
A portion of the Historical Society’s feedback went far beyond factual review and
suggested broader changes to the interpretive approach, including a
reconceptualization of one of the panels, expanded representation of individual
businesses and families, and additional themes such as Little Sister Bay, specific historic
buildings and families, cultural groups, expanded waterfront stories, travel across the
bay, geological context, and more detailed settlement history.
While I was able to incorporate some of those themes as small inserts, photo
representations, quotes or captions, and while many of those ideas are indeed
worthwhile, they are beyond the scope of the current two-panel project. I mentioned to
them that the additional ideas would be best suited for future interpretive planning and
would serve as excellent source material for their curator.
I explained in my response to their review that in public interpretation, selection is
necessary. A successful large-format exhibit panel must balance historical depth with
clarity, readability, visual hierarchy, accessibility, visitor engagement, and an appropriate
amount of content for the viewing environment. If the panels attempt to include every
important person, business, site, cultural group or theme, the result becomes too dense
to serve the public, or history, effectively.
I further explained that this specific project was designed as an interpretive
introduction to major themes as requested by the Village: settlement, commerce, the
working waterfront, recreation, and change over time. The panels are intended to
introduce the public to key historical themes through selected representative examples;
wayside exhibits of this nature cannot, and should not, function as a comprehensive
inventory of Sister Bay’s history. The absence of a specific name, business, family, group,
or location does not suggest that it is unimportant; rather, it reflects the interpretive
limits and public-facing purpose of this particular format.
I recommended that the more detailed stories suggested in their comments, including
individual businesses, families, ethnic communities, buildings, and waterfront sites, are
far better suited to other types of interpretive media: the future waterfront museum
perhaps, or the smaller proposed wayside exhibits near historic buildings, walking-tours,
160
museum exhibits, archives, oral histories, or even digital interpretation such as the
development of an app.
The purpose of this exhibit project was to provide a focused historical snapshot and
visual catalyst, a starting point that sparks curiosity and encourages viewers to learn
more through a visit to the Historical Society, the museums or joining a tour. The exhibit
will be a wonderful launching pad for the further creation of in-depth interpretive
exhibits on specific topics as was proposed earlier.
Lastly, as you know, these are large panels, and they have been designed and developed
with large-format interpretive exhibit best practices in mind. At this scale, the charge
was to create an experience that is visually engaging, accessible, and easy to navigate,
while encouraging visitors to look closely, make connections between images and
information, and spend more time with the history being presented. The design
balances clarity, readability, visual hierarchy, visitor engagement, and an appropriate
amount of content for public-facing interpretation.
In short, we invited factual review from the Historical Society, incorporated appropriate
factual corrections, images and select content refinements, maintained the approved
design direction and structure so we can stay on track for installation.
The panels are now ready for Village review, approval, and production sign-off as the
final step.
5. Miscommunication stone bench and counter: After going over so final details with the owner of
Peterson Masonry it was discovered that the cost of material for the project was not included in
the winning bid. The discovery of this halted any start date. I informed the owner that I will need
a cost estimate for material, securement of additional funding and approval on a new start date
before any work can be performed. Two weeks have now passed, and I have not heard back
from Peterson Masonry.
6. Memorial Bench Cost: Cost of having staff construct bench with new concrete pad $3,303.42.
Cost of having staff construct bench without concrete pad $2442.42. Totals include an average
of staff’s charge-out rate. Bob Jischke, the committee’s recommended carpenter, failed to call
me back after repeated attempts to contact him for a cost estimate. I will continue to try and
161
reach him in the hopes I will have a number from him for the upcoming meeting. Committee
also asked for pre-manufactured options to consider.
Silhouette plastic wood Grain Naturals Memorial L:8FT
W:19-26” H16.5-32” cost $1,325.00 with two panels engraved. The bench comes in light brown,
dark brown and gray.
Contour Bench L:8Ft 2x4 Natural wood
$562.00 plastic L:8 3x4 $1312.00 three leg L:8 plastic 4x4 $1759.00 three leg.
7. South Spring Road flooding: I met with Skyler from Stantec he will be putting together a
conceptual plan for ditching along the east side of the road for the committee to review. I’m
hoping to have this plan ready to present for July meeting.
162
8. Monroe trucking completed the fabrication and installation of the wood chipping cap.
9. Water Quality sign: The county recently became aware that the transfer of ownership and
responsibility for ongoing cost for the signs cellular service was not clearly communicated at the
time of distribution. The letter sent out from the county will be provided in your pocket for
review. We do $500.00 in Parks code- membership dues to cover cost for this year. If committee
163
decided to move forward with paying for the cellular service a dollar amount can be budgeted
for in the future.
10. Triptow’s tree service was hired to cut down five trees around the village. One at Gateway Park,
one at Pebble Beach and three at the intersection of Woodland Dr and Forest Ln.
164
Village of Sister Bay | Parks Committee
RE: Exhibit Review for Production Approval 26 May 2026
Dear Village Staff and Committee Members,
I am pleased to enclose the draft exhibit panels for Village review. These final draft panels reflect the
completed factual review process with the Historical Society. Their feedback was carefully reviewed and
considered, and appropriate revisions were incorporated where they supported the project scope and
could be accommodated within the existing design structure.
As you review these files in your packet, please keep the following context in mind:
Scale & Presentation: These are large-format exhibit panels, each measuring approximately 6 feet wide
by 2 feet high. When viewed digitally on a computer screen, the text and graphics will appear more
compressed than they will at full scale. Please review with the final installed size and viewing distance in
mind.
Design Direction & Readability: These final drafts represent the fully developed design direction,
graphic layouts, and thematic structure for this project. At this stage, the visual framework is designed to
balance substantial historical content with public readability, accessibility, visitor engagement, and the
production schedule.
Interpretive Approach: The panels are intended to provide a focused historical snapshot and visual
catalyst, a starting point that sparks curiosity and encourages viewers to learn more. The exhibits are
organized around the central interpretive themes established for this project: settlement, commerce, the
working waterfront, recreation, and change over time. They use selected representative examples to tell a
broader story rather than attempting to serve as a comprehensive inventory of Sister Bay’s history. More
detailed stories can continue through future topic-focused wayside exhibits, walking-tour interpretation,
waterfront museum exhibits, and other planned or proposed interpretation throughout the Village.
As the panels move toward production, the most helpful feedback will be any comments that would affect
approval or fabrication, including factual corrections, Village-specific concerns, production or installation
considerations, or any pressing comment the Committee feels should be addressed before the panels
move into fabrication.
Comments may be provided by marking up the PDF directly or by sending written comments in one
consolidated email, organized by panel and location. Please provide one consolidated set of Village
committee comments by Thursday, June 4, so we can transition these files into fabrication for installation
the week of June 15. If you have no additional requests for edits or comments on the exhibits themselves,
please respond with “Approved for production,” and we will move the panels into proofing and
fabrication.
It has been a pleasure to develop these exhibits and to create an engaging, accessible public history
experience for the Village of Sister Bay. Thank you for your time, leadership, and review of these final
drafts as we move the project into production.
Best regards,
Julie
165
PROGRESS & PROSPERITY
DRAWN TO BUILD COMMUNITY
Drawn first by necessity
and now by connection,
generations have found
livelihood, community,
recreation, and inspiration
along the waters of Sister Bay.
As docks, mills, stores, roads, and
businesses grew, Sister Bay became
a place of commerce and connection.
Over time, the waterfront shifted from
working harbor to place of recreation,
and inspiration, drawing residents and
visitors back to the bay again and again.
Waterfront Industry Takes Hold
1870s
The Roeser Era
1880s-1930s today
First Permanent Settlers
1854-1857
French explorer Jean
Nicolet becomes one of
the first Europeans to
traverse the waters of
Green Bay.
Scandinavian immigrants,
including John Thoreson and
Ingebret Torgerson, build
homes, farms, and piers, drawn
by familiar landscapes and
access to the bay.
First European Passes By
1634
The Dimond brothers build
a pier, sawmill, and grist
mill, transforming Sister
Bay into a working
waterfront community.
The Roeser family
become central to the
village’s economic and
social life by expanding
milling, shipping, and
hospitality.
Progress and Prosperity
Early 1900s
Stores and businesses of
all kinds continued to
develop and eventually
made Sister Bay the
commercial hub of
northern Door.
april 1912
Residents vote to break
off from Liberty Grove
and form their own
village, seeking better
roads, local control, and
economic independence.
Incorporation of Sister Bay
july 1912
A devastating overnight
fire destroys the business
district at today’s Highway
42 & Maple. The village
rebuilds, showing their
resilience.
The Great Fire
1900-1960s
As forests are cleared,
farming and orchards
become the dominant
way of life, reshaping
both land and economy.
From Logging to Agriculture
1969
A National Geographic
article sparks a surge in
visitors, transforming
Sister Bay into a major
tourism destination.
Tourism Boom Begins
1971-1972
Sister Bay becomes the
first municipality north
of Sturgeon Bay with
municipal utilities,
reshaping the village
permanently.
Water and Sewer Revolution
1990s-present
A modern marina and ongoing
shoreline preservation
projects reinforce Sister Bay’s
identity as a place where
public access to the water
defines the community.
Marina and Waterfront VisionBefore European Settlement
pre-1600s
The Potawatomi, Ojibwe,
Ho-Chunk and Menominee
peoples fish, hunt, and
travel throughout the
Peninsula.
Village of Sister Bay and the
Sister Bay Historical Society
work together to preserve,
share, and celebrate the
stories that continue to
shape this community.
Preservation and Growth
LOGGING, FISHING & FARMING
DRAWN TO GATHER & ENJOY
RECREATION & WATERFRONT
DRAWN TO MAKE A LIFE
Fishing, logging, and farming
brought early settlers to Sister Bay,
where land and water offered the
resources needed to build a life.
For generations, people
have been drawn to this
landscape for its beauty
and richness in natural
resources.
First to make a life,
later to make a living,
and today to gather,
recreate, and find
inspiration.
WHAT DRAWS YOU
TO THE WATER?
Explore the stories that
connect this landscape
to its people and its past.
Discover how the land and
waters of Sister Bay continue
to shape its history.
When they fished in deep water, the
fishermen started out before dawn
to lift the nets they set the day
before. They would go maybe three
hours out from shore and it would be
mid afternoon before they returned.
Ingrid Nelson Lawrenz
The Fruit Growers
Cooperative operated
a processing plant
that was vital to the
region, providing a
sales outlet for millions
of pounds of cherries
and apples annually.
Sister Bay has become the
commercial hub of the Door
Peninsula. It offers the largest
shopping center north of
Sturgeon Bay!
June 16, 1950, Green Bay Press-Gazette.
Orrin Hansen in
his grocery, 1939.
The first bus service for Door County was
provided by Ernest Isaacson of Sister Bay,
1927.
Herman Grasse and cattle at Pebble
Beach in Little Sister Bay, 1908.
D r a w n T h r o u g h T i m e
These select moments in
history trace how people
have been drawn to Sister
Bay across generations.
Consider how the land,
water, and people of
each era helped shape
the village you see today.
Laughing Waters
fishing boat owned
by Herman Erickson,
1910.
Mills, docks, and
freight boats once
lined this shoreline,
connecting Sister Bay
to the forests, farms,
and communities
beyond the bay.
Masterfreeze Corporation: Operating on
Main Street from 1945 to 1966 as a major
refrigeration assembly plant and premier
industrial employer.
Kitchen crew at Pisha’s,
1950s.
Highway 42, Fall Festival, early 1960s. Couple on a sail sleigh.
“Sister Bay Bays” baseball team.
A Sunday cruise on Little Sister Bay
with the old fish house in the background.
Steamships were the main mode of travel
for residents and tourists, circa 1912.
The Roeser feed mill, sawmill, and dock.
Ludwig and Hjalmer Seaquist
at their blacksmith shop.
Car dealers and garages included Becker’s,
Brodd’s, Hendrickson’s, Roy’s, Logerquist’s
and others.
Kramer/Grasse dairy, 1935.
Hand-painted billboard, late 1940s.
National Geographic, 1969.
Gibraltar
students
enjoy sodas
at Rudy’s,
1958.
NAL DRAFTNAL DRAFT
FINAL DRAFTFINAL DRAFT
FINAL DRFINAL DR
FINAL DRAFTFINAL DRAFT
FINAL DRAFTFINAL DRAFT
FINAL DFINAL D
FINAL DRAFTFINAL DRAFT
FINAL DRAFTFINAL DRAFT
FINALFINAL
FINAL DRAFT — FOR VILLAGE PRODUCTION APPROVAL
166
1
4
8
9
7
2
11
14
16
19
B
e
pisha’s
restaurant
bunda’s
store
e
A
C
D
B
Suffragist speaking to group at
Bunda store/post office, 1912.
Suffragist speaking to group at
Bunda store/post office, 1912.
The Carolina docked at Roesers,
1912. Steamships were the main
mode of travel.
The Carolina docked at Roesers,
1912. Steamships were the main
mode of travel.
Guests at the bar of the early
Sister Bay Hotel.
Guests at the bar of the early
Sister Bay Hotel.
Men cut ice with a converted
Model T ice machine, 1941.
Men cut ice with a converted
Model T ice machine, 1941.
Common tent for changing
into swimming suits at the
Growerly picnic area.
Common tent for changing
into swimming suits at the
Growerly picnic area.
The Casperson Funeral Sleigh.
The Casperson Funeral Sleigh.
It was a hard life, filled with
dangers and privations, which
all shared. If any happened to
run out of food, others were
ready to share what they had,
and if there was an accident
or sickness, all were ready to
help.
Jischke’s Meat Market, ‘Maple
Inn,’ 1936.
Jischke’s Meat Market, ‘Maple
Inn,’ 1936.
D
sister bay
hotel
Sister Bay
Historical
Society
People arrived at our docks
in boats... landing cargo and
passengers alike. And what a
pleasant sight when the vessel
turned the bluffs, stately and
large as it hove in sight. And
what excitement it was to be
where friends were hilariously
greeted, and trunks were
carried on the backs of men
to the inns.
Helen Mills Clark, Where the
Dinner Bell Rings, 1944.
Sister Bay Correspondent, Door
County Advocate, March 1876.
Our sawmill furnishes
employment to many hands
both summer and winter.
Good wages are earned in
loading vessels in the season
of navigation, and altogether
we are a contented little
community... all we want is
more good citizens and a
good hotel.”
4. 1857 torgerson home
10. 1896 moravian church
11. 1922 elmer hilander dairy
12. 1878 zion lutheran church
13. 1912 mickelson store
14. 1898 Liberty park lodge
15. 1914 Hotel du Nord
16. produce dock
17. anderson Meat Market
18. sister bay auto
19. isaacson Bus Line
Travel back in time! Explore the Village of Sister Bay’s past.
1. 1854 The First Settlement
2. Little Sister Cemetery
3. Corner of the Past Museum
Tour the 1875 Anderson
family farmhouse and
15 renovated buildings.
5. 1877 First baptist church
6. 1972 Sister Bay sewer & water
Dr. Fichtner’s home in the 1900s.
7. 1947 fruit growers co-op
Canning factory and storage.
8. appleport school
9. co-op cheese factory
17
13
10
6
5
12
15
18
3
Transportation was by foot,
horse, or boat. The arrival of
Goodrich boats brought new
people and more industry to
the area.
Dana
Implement
Tourists along Hwy 42,
1920s.
you are hereyou are hereyou are here
Roeser Lumber
and feed mill
john pahl
hardware
C
Kellstrom’s
dock
Casperson
Funeral Home
fire of 1912
A
sister bay
shell station
emil becker
garage
roeser
homestead
Sister Islands
Sister Islands
jisChke meat
market
Pisha’s
Blacksmith
Shop
in another time
HISTORY
is all around you!
Little
Sister Bay
Sister Bay
White Pebble Beach in
Little Sister Bay, circa
1900. Where it all began. The Sister Bay Hotel, taken from
inside Bunda’s store, 1912.
The Sister Bay Hotel, taken from
inside Bunda’s store, 1912.
Look out toward the bay.
Imagine the shoreline alive
with work—boats arrive,
lumber mills run, goods
move across docks, and
shop doors open downtown
to serve a growing village.
Site of Dana Implement, 1904.
Later Husby’s blacksmith, Brodd’s
garage, and Jungwirth Hardware.
Site of Dana Implement, 1904.
Later Husby’s blacksmith, Brodd’s
garage, and Jungwirth Hardware.
The Roeser home also held the
first post office, general store
and creamery, 1910.
The Roeser home also held the
first post office, general store
and creamery, 1910.
Pisha’s restaurant and home.
Pisha’s restaurant and home.
Imagine
Sister Bay
John Pahl inside his hardware
and furniture store, 1908.
John Pahl inside his hardware
and furniture store, 1908.
Bunda store, where butter and
eggs were bartered for buttons
and other goods.
Bunda store, where butter and
eggs were bartered for buttons
and other goods.
Joe Pisha and Barney Hoefert
in the blacksmith shop.
Joe Pisha and Barney Hoefert
in the blacksmith shop.
Postcard from Kellstrom Dock.
Postcard from Kellstrom Dock.Sister Bay Shell Gas Station.
Sister Bay Shell Gas Station. Inside the Emil Becker Garage,
later Masterfreeze Corporation.
Inside the Emil Becker Garage,
later Masterfreeze Corporation.
youyou
are hereare here
you
are here
John Seaquist, 1954.
The namesake islands
of Sister Bay
Downtown Sister Bay, circa 1915.
The Steamer Sailor Boy: Exchanged
manufactured goods and tools for
local farm produce and hides while
transporting passengers along
Green Bay.
Before this shoreline was
protected from modern
development in 2019,
these smooth limestone
rocks marked the site of
the original 1854 Sister
Bay pioneer settlement.
Hotel du Nord postcard,
1939.
Liberty Park Lodge and cottages,
circa 1920.
This aerial view captures the
1857 Torgerson property
operating as the "Forest Idyll"
resort, circa 1950s.
Sister Bay Moravian
Church, circa 1908.
Sister Bay Auto,
circa 1920s.
Zion Lutheran Church, 1924.
Swedish
Baptist
Church,
circa 1905.
The Old Anderson House at
the Corner of the Past
Museum grounds.
4
5
10
3
18
15
12
14
Al Mickelson’s
General Store,
circa 1912.
13
Anderson’s
Meat Market,
circa 1910.
17
FINAL DRAFTFINAL DRAFT
FINAL DRAFTFINAL DRAFT
FINALFINAL
FINAL DRAFTFINAL DRAFT
FINAL DRAFTFINAL DRAFT
FINAL DRAFTFINAL DRAFT
FINAFINA
FINAL DRAFTFINAL DRAFT
FINAL DFINAL D
FINAL DRAFT — FOR VILLAGE PRODUCTION APPROVAL
167
168
Source: Village of Sister Bay website. First collected Oct 10, 2026.