Plan Commission — Agenda packet
Village of Sister Bay · Door County · Plan Commission · meeting of May 26, 2026 · Agenda packets
Open the original document More from Village of Sister Bay
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Posted On: 05/22/2026
PLAN COMMISSION MEETING AGENDA
Tuesday, May 26, 2026 -- 5:30 P .M.
Sister Bay-Liberty Grove Fire Station – 2258 Mill Rd., Sister Bay, WI – Large Meeting Room
To access the meeting electronically, click:
https://zoom.us/j/4439901723?pwd=yAVpi40M1OIqgNufcVUE8XWCUSkKaH.1&omn=9706363858
Meeting ID: 443 990 1723 Passcode: 304078
To connect by phone: 1-301-715-8592 - Meeting ID 443 990 1723#
For additional meeting information visit: www.sisterbaywi.gov, click ‘Agendas and Minutes’ or watch the meeting video online.
AGENDA
1. Call to Order & Roll Call
2. Approve of the Agenda
3. Approve Meeting Minutes:
a) May 14, 2026; Special Meeting
4. Comments, Correspondence, and Concerns from the Public
5. Discussion/Action Items:
a) Development Agreement Amendment; Coming of Age in Sister Bay, LLC; 10615 & 10619 Sister
Bluff Drive
b) Development Agreement Amendment; Lunaview; 2399 Maple Drive
c) Zoning Code Interpretation; Temporary Banner Display Request; Ben Ehlers; Chop; 2345 Mill Rd
d) Site Plan Review; Lure; 10627 N Bay Shore Drive
e) Courtesy Review; Friends of the Ice Rink; Ice Rink Reconstruction; 2155 Autumn Ct
f) Courtesy Review; Adam and Bridgid White; Sister Bay General Store; 10674 North Bay Shore Drive
6. Permit Activity Log
7. Matters to be Placed on a Future Agenda or Referred to a Committee, Official or Employee
a. Zoning Code Review
8. Next Meeting
• Regular Monthly Meeting; June 23, 2026, at 5:30 P.M.; Large Meeting Room, Sister Bay-Liberty
Grove Fire Station
9. Adjournment
Public Notice
For questions regarding the above agenda items or to review the related files contact Benjamin Andrews, Village Administrator,
at administrator@sisterbaywi.gov. To submit letters in support or opposition of an agenda item that is not part of a public hearing,
email adminassist@sisterbaywi.gov by 4:00 pm the day before the meeting; letters regarding a public hearing must be received by 4:00
pm the Thursday before the hearing. It is possible that members of, or quorum of, other governmental bodies may attend the meeting
to gather information; no action will be taken by any governmental body other than the body specifically referred to above. Upon
reasonable notice, a good faith effort will be made to accommodate the needs of disabled individuals through sign language interpreters
or other auxiliary aid or accommodation at no cost to the individual. Due to the difficulty in finding interpreters, requests should be made
as far in advance as possible, preferably a minimum of 48 hours. For additional information or to request this service, contact the Village
Administration Office at 920.854.4118 or in writing to: Village Administration Building, 2383 Maple Dr., PO Box 769, Sister Bay, WI 54234.
Copies of reports and other supporting documentation are typically available online and can also be viewed at the Village Administration
Office 8 am – 4 pm Monday through Thursday, except holidays.
The Village of Sister Bay is an Equal Opportunity Provider & Employer
1
VILLAGE OF SISTER BAY 1
SPECIAL PLAN COMMISSION MEETING MINUTES 2
THURSDAY, MAY 14, 2026 3
UNAPPROVED 4
5
6
1. Call to Order & Roll Call 7
Chair Nate Bell called the Special Plan Commission meeting to order on Thursday, MAY 14, 2026, at 8
4:00 P.M., and roll call was taken. 9
10
Present: Commission members: Chair Nate Bell, Laurel Harff, Skip Heidler, Brigid White. Jerry Ahrens 11
was excused. 12
13
Staff Member(s): Village Administrator Benjamin Andrews , Administrative Assistant Sarah Bertges , 14
and Dave Lienau Marina Manager. 15
16
Others: Kurt Harff, Allen Gokey, Garritt Bader, Paula Hedeen, Pam Heyrman, John Heyrman, Dan 17
Mortier, Katelyn Jerard VIA ZOOM: Dr. Jennifer Hall, Lori Pollatz, Mary W, Jake Gazlay, Chris Schmeltz. 18
19
2. Approve the Agenda 20
Motion to approve the agenda was made by Bell and second by Heidler. Motion carried -all ayes. 21
22
3. Approve Meeting Minutes 23
a) March 31, 2026; Regular Meeting 24
b) April 20, 2026; Special Meeting 25
Both sets of meeting minutes were presented together. No corrections were identified. 26
Motion to approve the minutes for both the March 31, 2026 Regular Meeting and the April 20, 2026 27
Special Meeting was made by Heidler and second by Harff. Motion carried -all ayes. 28
29
4. Comments, Correspondence, and Concerns from the Public 30
-Bell noted that a letter from a prior period had been included in the meeting packet and had been 31
resubmitted. Andrews confirmed that he and Bell had subsequently met with the relevant parties 32
approximately two weeks prior. White inquired whether the matter would appear on a future agenda, 33
and Bell confirmed it would be addressed at an upcoming regular meeting. 34
-Paula Hedeen, a property owner, addressed the Commission regarding her concerns about the 35
rezoning of her property. Ms. Hedeen stated that she had submitted an email to both Bell and 36
Andrews seeking information about why her property was rezoned and what the applicable 37
dimensional standards were for the commercial and R-2 residential districts, as she had a prospective 38
buyer for the property. She indicated that she had not received a response to her inquiry and 39
expressed frustration about a perceived lack of communication. She further noted that she had missed 40
the meeting at which the rezoning was finalized due to a notification error, and that she was 41
subsequently informed she had missed a 30-day appeal window. 42
Bell acknowledged Ms. Hedeen's concerns, apologized for any perceived lack of communication, and 43
confirmed that a meeting had been attempted to be scheduled. He reiterated that the public comment 44
period is not a question-and-answer session, but that her concerns were heard and a response would 45
be forthcoming. 46
2
May 14, 2026 Special Plan Commission Meeting- Unapproved
2
5. Discussion/Action Items 1
2
a) Courtesy Review; Marina Building; 10733 Bay Shore Drive 3
4
Andrews introduced the item, noting that the design for the new marina building at 10733 N Bay Shore 5
Drive is substantially complete. The Marina Manager, Dave Lienau, and White were present to receive 6
feedback from the Commission. The purpose of the courtesy review was to assess consistency with 7
the zoning code and the village's architectural guidelines. No significant site plan issues related to 8
setbacks or green space were identified. White noted that the specific materials called out in the plans 9
were placeholders, and that final material selections would be confirmed by the marina committee 10
prior to permit application. 11
Discussion touched on several topics. Bell raised the matter of solar panels, stating his strong 12
preference that the village investigate the financial payback of a solar installation given the building's 13
favorable sun exposure and the marina's peak energy usage in summer months. Heidler acknowledged 14
the merit of researching it but noted that aesthetics would need to be factored in, as panels would be 15
most visible on the public -facing side of the building. Lienau confirmed that the architecture firm's 16
green energy specialist had been contacted and would provide an updated analysis. 17
Heidler also suggested exploring dark -sky compliant lighting where feasible, and raised a question 18
about the existing storage shed to the rear of the building. Lienau explained that the shed is used for 19
storing petroleum products, grills, and other outdoor equipment unsuitable for interior storage, and 20
that it sits on DNR-permitted property. The Commission discussed adding vegetative screening around 21
the shed to reduce its visual impact once surrounding trees are removed during construction. Lienau 22
confirmed that civil engineering work, including pavement layout and bollard placement, remains to 23
be completed. 24
The Commission also briefly discussed the construction timeline relative to the village's development 25
agreement restrictions on exterior work. White and Bell noted that the restrictions are embedded in 26
the standard development agreement rather than in ordinance, and that the Commission would be 27
receptive to a request for flexibility if it were accompanied by a clear timeline justification. No formal 28
action was taken; the item was a courtesy review for Commission feedback. 29
30
b) Site Plan Review; Coming of Age in Sister Bay, LLC; 10615 & 10619 Sister Bluff Drive 31
Andrews introduced the site plan review for the second building of a previously approved multi -32
building development. He noted that the proposal is largely consistent with the original 2024 approval, 33
with two modifications: the addition of a sunroom on the rear of the building, and a request for two 34
driveways in lieu of the single driveway approved under the original site plan. Village code permits a 35
second driveway with Plan Commission approval. 36
Applicant Garritt Bader explained that the original single -driveway configuration would require 37
clearing nearly all trees between the garages and Sister Bluff Drive to accommodate the stormwater 38
retention pond layout. By reconfiguring the stormwater pond and introducing two narrower individual 39
driveways—one per building—the significant majority of the existing trees along the street frontage 40
could be preserved, and total impervious surface would be reduced. 41
The Commission discussed the appropriate width for each driveway. Bell proposed 18 feet as a 42
reasonable width, noting it would accommodate two passing vehicles at low speed. The applicant and 43
Harff expressed agreement. Harff noted that the two -driveway layout made logical sense given the 44
building configuration and the green space proposed between the structures. The Commission also 45
discussed the need for propane tank screening and confirmed that replanting of trees along the street 46
frontage—including in the area disturbed by the current construction access—would be required and 47
should be confirmed in the development agreement. 48
Andrews clarified that a draft development agreement had been prepared and would return to the 49
Commission at the next regular meeting for formal action. The Commission requested that building 50
height be confirmed and included in the materials at that time. The Commission indicated general 51
support for the sunroom addition, noting that impervious surface limits were not exceeded. 52
3
May 14, 2026 Special Plan Commission Meeting- Unapproved
3
No formal motion was made at this meeting; the item will return with the development agreement 1
for recommendation to the Village Board. 2
3
c) Standard Zoning Application; Chop Restaurant; 2345 Mill Rd 4
Andrews presented this item as a follow-up to a prior meeting at which the Commission had directed 5
Chop Restaurant to provide screening for its mechanical accessory structure in the form of an 8 -foot 6
wood fence with materials consistent with the building's siding. The applicant resubmitted plans 7
reflecting an 8-foot cedar fence consistent with that direction. 8
Heidler commended the applicant for responding to the Commission's feedback. Discussion confirmed 9
that the fence should be painted to match the red siding of the building, with white trim consistent 10
with the building's exterior trim, rather than the black trim depicted in the submitted rendering. White 11
concurred, noting that the color should simply match the building. 12
Motion to approve the standard zoning permit application for Chop Restaurant, with the condition 13
that the fence color and trim match the building's existing exterior siding and trim colors, was made 14
by Heidler and second by Harff. Motion carried -all ayes. 15
16
d) Revised Site Plan/Plat Submission; Luna View Development; 2399 Maple Drive 17
Andrews summarized the proposed revisions to the previously approved site plan for Luna View 18
Development, originally approved by the Plan Commission on October 25, 2022. The modifications 19
consist of two components: reassigning the rooftop deck area of Unit 301 from common space to 20
private ownership under that unit, and minor adjustments to the guest parking layout. 21
Applicant Allen Gokey explained that the rooftop deck change is driven by insurance liability 22
considerations. As common space, the association's insurance costs increased substantially; assigning 23
the deck to Unit 301—which Gokey will own—transfers the liability to him personally, reducing costs 24
for the association. He confirmed that the physical footprint and square footage of the deck are 25
unchanged. 26
Andrews noted that correspondence had been received from a neighboring property owner raising 27
questions about the rooftop area and certain discrepancies in what had been depicted in renderings 28
versus what was approved. He acknowledged the development agreement language had been 29
ambiguous on this point, and suggested the amendment could provide an opportunity to clarify. 30
Discussion also arose regarding the visual impact of the building's white rubber roof, which several 31
Commission members and neighboring residents had noted as visually prominent. Gokey 32
acknowledged the concern and indicated that enclosing the mechanical area—adding doors and wood 33
trim consistent with the rest of the building —was feasible. The Commission indicated its preference 34
that the rooftop area be modified to reduce the visual impact of the white roof and better integrate 35
with the building's earth -tone palette, and that this condition be reflected in the amended 36
development agreement. 37
Motion to recommend approval to the Village Board of the revised site plan for Luna View 38
Development, including the Unit 301 rooftop designation change, the revised guest parking layout, 39
and a condition requiring mitigation of the rooftop color/visual impact to be reflected in the amended 40
development agreement, was made by Bell and second by Harff. Motion carried -all ayes . 41
42
e) Setback Review in P‑1 Zoning District; Peninsula Kayak Company; Accessory Structure 43
Andrews introduced the item, which had been referred from the Parks, Property, and Streets 44
Committee. The Committee sought Plan Commission input on the placement of a small accessory 45
storage shed for a park vendor providing e -bike services at Waterfront Park. Two potential locations 46
had been identified—one marked in red and one in yellow on the provided map. The P-1 zoning district 47
requires 50-foot front and rear setbacks, with side setbacks to be determined by the Plan Commission. 48
Heidler raised a question about whether the side setback might be further constrained by the more 49
restrictive abutting R -2 planned unit development district under the applicable code provisions. 50
Andrews indicated this would require review of the original PUD file, which predates current records. 51
Bell suggested this level of analysis may not be necessary given the modest nature of the structure —52
4
May 14, 2026 Special Plan Commission Meeting- Unapproved
4
approximately 5 feet wide by 5 feet tall by 6 feet deep, of wood construction on a non -permanent 1
base. 2
The Commission generally agreed that the yellow location was preferable to the red location from a 3
neighbor impact standpoint, and noted that the vendor had expressed willingness to place the shed 4
wherever was acceptable to both the village and adjacent property owners. The Commission directed 5
that the vendor coordinate directly with the adjacent condominium association (Sister Bay Yacht Club) 6
to identify a mutually agreeable location, and that Andrews be authorized to approve the final 7
placement once that consensus is reached, without requiring the matter to return to the full 8
Commission. 9
No formal motion was required, as this was a courtesy referral from the Parks Committee. The 10
Commission noted its direction by consensus. 11
12
f) Standard Zoning Permit; Door County Housing Partnership, Inc.; 2407 Ava Hope Trail 13
Andrews presented a zoning permit application from Tim Halbrook on behalf of Door County Housing 14
Partnership, Inc. for a single-family residential development in an R-2 district. All compliance standards 15
were met. However, the R -2 district requires one tree to be planted for every 40 feet of street 16
frontage, with the tree species subject to Plan Commission approval. 17
Discussion centered on appropriate species selection for the location. Heidler, drawing on his 18
familiarity with local conditions, advised against monocultures and noted that visually prominent 19
conifers would be inappropriate near corner sight lines. He recommended species from the birch and 20
maple families, noting that ornamental varieties tend to remain at a more manageable size than native 21
hardwoods such as oak or sugar maple, and are better suited to roadside conditions including salt and 22
pollution exposure. 23
The Commission agreed to direct the applicant toward species from the birch and maple families, with 24
no conifers to be planted in corner-adjacent locations. Andrews confirmed this direction was sufficient 25
to issue the permit with the appropriate condition. 26
27
g) Discussion on Zoning Code Revisions and Related Items 28
Bell initiated a broader discussion on the state of the village's zoning code, characterizing it as 29
organically grown over many years and difficult to read and interpret. He noted that the code does 30
not always align with the village's current vision for land use. White agreed, noting that relevant 31
regulations for a given district are often scattered across multiple sections of the code in ways that 32
are not intuitive to the reader. Harff similarly noted difficulty locating specific provisions. 33
Bell expressed a preference for engaging an outside consultant rather than conducting a purely in -34
house review, citing both the volume of work involved and the recommendation of the village 35
attorney, Randy Nesbitt, that an external resource is preferable for such an undertaking. Andrews 36
noted that a previous contact, Jeff Sanders, had indicated he was not currently accepting new clients 37
for strategic planning work, though he may be available in a later timeframe or in a different capacity. 38
The Commission agreed that other sole proprietors or planning firms offering similar services should 39
be considered. 40
Heidler suggested that as a first step, the Commission conduct a section-by-section review to identify 41
the scale and nature of changes needed before engaging a consultant. Bell acknowledged this 42
approach but indicated the Commission had gone through that process previously without achieving 43
the desired results, and reiterated his preference for outside expertise. The Commission agreed to 44
pursue both tracks —gathering a preliminary list of desired changes from each member while 45
simultaneously exploring consultant options. 46
Specific areas identified for near-term review included: permitted uses across zoning districts (which 47
were noted as having been developed ad hoc around specific businesses over time), accessory 48
dwelling units (ADUs) with provisions to prevent their conversion to short -term rentals, parking 49
standards in the B-3 district, and the sign permit process. Bell noted that text amendments could be 50
bundled into a single public hearing to maximize efficiency. 51
5
May 14, 2026 Special Plan Commission Meeting- Unapproved
5
Andrews also raised the matter of standardizing the format of zoning permit applications to improve 1
the Commission's ability to verify calculations —including square footage, green space, and lot 2
dimensions—before materials are presented for review. The Commission directed that a more 3
consistent calculation format be developed and included in future permit submissions. 4
5
6. Matters to be Placed on a Future Agenda or Referred to a Committee, Official or Employee 6
The Commission identified the following items for future agendas: 7
● The Savard/auto repair use matter will be incorporated into the broader zoning code revision 8
process, with a target timeline of fall 2026. 9
● A monthly permit log will be distributed to Plan Commissioners by staff; a standing discussion item 10
will be placed on future agendas for any permit-related questions or concerns. 11
● The development agreement for Coming of Age in Sister Bay, LLC (Item 5b) will return at the May 12
26, 2026 regular meeting. 13
14
7. Next Meeting 15
The next regular monthly meeting is scheduled for Tuesday, May 26, 2026, at 5:30 P.M., in the Large 16
Meeting Room, Sister Bay-Liberty Grove Fire Station. 17
18
8. Adjournment 19
Motion to adjourn was made by Bell and second by Harff. The motion carried -all ayes. 20
The meeting was adjourned. 21
Motion to adjourn at 5:40 PM. 22
Motion by Heidler second by Harff. Motion carried -all ayes. 23
24
25
Respectfully submitted by Sarah Bertges, Administrative Assistant 26
6
Page 1
STAFF REPORT
Date: May 26, 2026
To: Plan Commission
Re: Development Agreement Amendment; Coming of Age in Sister Bay, LLC;
10615 & 10619 Sister Bluff Drive
Author(s): Benjamin Andrews, Village Administrator
Action(s) Requested: ☐ Ordinance ☐ Resolution ☒ Motion ☒ Receive/File
BACKGROUND INFORMATION
The Village has received an updated Site Plan Review request from Coming of Age in Sister Bay,
LLC for the second duplex building within a previously approved multi ‑building development on
parcel 181 ‑00‑05312833NI. The first building was reviewed and approved by the Plan
Commission in 2024.
The applicant has also submitted a proposed amendment to the existing Development
Agreement. The updated request and related documents were reviewed informally by the Plan
Commission at its May 14, 2026, special meeting.
DEVELOPMENT AGREEMENT AMENDMENT
The Development Agreement was originally approved on November 22, 2023, and amended on
October 15, 2024. The proposed amendment (Amendment 2) would:
1. Extend the completion deadline for the second duplex building to June 16, 2028.
2. Revise the site plan to allow two 18 ‑foot driveways, consistent with the driveway plan
reviewed at the May 14, 2026, meeting.
3. Include the sunroom additions.
All other terms of the existing Development Agreement remain unchanged. Further, it is clarified
that the requirements that the propane tank(s) are to be screened from public view and the
existing landscaping along the frontage have been included in the November 22, 2023,
Development Agreement.
Here are the locations of the existing executed development agreements:
• Fully Executed Development Agreement (1).pdf
• Fully Executed Development Agreement (2).pdf
7
Page 2
Lastly, the building height is proposed as 25’-1”.
ATTACHMENT(S)
1. Proposed Development Agreement
a. Site Plan
b. Building Plans & Elevations.
c.
STAFF RECOMMENDATION
Staff recommends that the Plan Commission recommend approval of Amendment 2 to the
Development Agreement to the Village Board.
8
AMENDMENT TO THE COMING OF AGE IN SISTER BAY , LLC 1
DEVELOPMENT AGREEMENT 2
SISTER BLUFF DRIVE 3
4
THIS AGREEMENT is made and entered into this 16th day of June 2026, by and between the 5
Village of Sister Bay, Door County, Wisconsin, a Municipal Corporation (“the Village”), and COMING 6
OF AGE IN SISTER BAY , LLC (“the Developer”). 7
8
RECITALS 9
10
WHEREAS, on May 26, 2026 , the Plan Commission reviewed the terms of the Development 11
Agreement between Village officials and Garritt R. Bader, d/b/a COMING OF AGE IN SISTER BAY , LLC, 12
which was approved by the Village Board on November 22, 2023, and amended on October 15, 2024, 13
and recommended that Section 1 – VILLAGE APPROVALS, be amended to extend the deadline for 14
completion of the second duplex to June 16th, 2028, and, the site plan be revised to allow two 18 foot 15
driveways, instead of one driveway, as shown on the site plan reviewed by the Plan Commission on 16
May 14, 2026 , and attached hereto. Further, it is clarified that the requirements that the propane 17
tank(s) are to be screened from public view and the existing landscaping along the frontage have been 18
included in the November 22, 2023, Development Agreement. 19
20
NOW, THEREFORE, the parties hereby agree that all the provisions of the previously mentioned 21
Development Agreement and October 15, 2024, amendment shall remain in full force and effect, but 22
Section 1 – VILLAGE APPROVALS, shall be amended as stated above. 23
24
(Please note that all of the documents which previously were approved are attached to the original 25
Development Agreement dated November 22, 2023 , and, as attached to the amended Development 26
Agreement dated October 15, 2024.) 27
28
IN WITNESS WHEREOF, the Developer and the Village have caused this document to be signed 29
by their appropriate officers and their corporate seals to be hereunto affixed on the day and year first 30
above written. 31
32
[Signature page to follow] 33
34
9
Amendment (2) to the Coming of Age In Sister Bay, LLC Development Agreement
2
THE DEVELOPER 1
d/b/a COMING OF AGE IN SISTER BAY , LLC 2
3
4
_______________________________ 5
Garritt R. Bader, Registered Agent 6
7
STATE OF WISCONSIN ) 8
) ss: 9
COUNTY OF DOOR ) 10
11
Personally came before me this ______ day of ______________, 2026, the above named GARRITT R. 12
BADER, to me known to be the person who executed the foregoing instrument and acknowledged the 13
same on behalf of COMING OF AGE IN SISTER BAY , LLC. 14
15
_____________________________ 16
Notary Public, State of WI 17
My commission expires: _________ 18
19
20
VILLAGE OF SISTER BAY 21
22
23
_____________________________ 24
Nate Bell 25
Village President 26
27
STATE OF WISCONSIN ) 28
) ss: 29
COUNTY OF DOOR ) 30
31
Personally came before me this _____ day of ____________, 20 26, the above named NATE BELL, 32
Village President, of the above -named municipal corporation, to me known to be the person who 33
executed the foregoing instrument and to me known to be the Village President of said municipal 34
corporation, who acknowledged the execution of the foregoing instrument as said officer as the deed 35
of said municipal corporation by its authority and pursuant to the authorization by the Village Board 36
from their meeting on the 16th day of June, 2026. 37
38
___________________________________ 39
Notary Public, State of WI 40
My commission expires: _______________ 41
42
10
08/2023
5642029D_SPLIT DRIVES
5642029
LLP
----
JGS
2SITE PLAN
COMING OF AGE IN SISTER BAY, LLC
SISTER BLUFF DRIVE
VILLAGE OF SISTER BAY
DOOR COUNTY, WISCONSIN
1 3-14-2023 JGS GRADING PLAN EDITS
2 07/2023 JGS REVISED BUILDING PLAN
3 11/10/2023 JGS 4 UNIT SHARED DRIVE
NORTH
SCALE IN FEET
0' 20' 40'
CONCRETE PAVEMENT
ASPHALT PAVEMENT (5,951 SF)
LANDSCAPE AREA
GREEN SPACE
INDICATES NUMBER OF PARKING
STALLS
SITE DATA
ZONING
LEGEND
TOTAL AREA = 1.06 ACRES, 46,373 S.F.
BUILDING AREA = 0.19 ACRES, 8,124 S.F. (17.5%)
SIDEWALK/PARKING LOT AREA = 0.16 ACRES, 7,172 S.F. (15.5%)
GREEN SPACE = 0.71 ACRES, 31,077 S.F. (67.0%)
R-2 MULTIPLE-FAMILY RESIDENCE DISTRICT
1810005312833N1
PARCEL NO.
2
*NOTE: ALL DIMENSIONS ARE TO THE FACE OF CURB,
UNLESS NOTED OTHERWISE
BUILDING SETBACKS
FRONT YARD = 60' FROM CENTERLINE OF RIGHT OF WAY
SIDE YARD = 10' ON ONE SIDE, 25' TOTAL
REAR YARD = 30'
8 COVERED STALLS
2 SURFACE STALLS
10 TOTAL STALLS
PARKING DATAMARINERS POINTE DRIVE
SISTER BLUFF DRIVE
PR BUILDING 1
4,062 S.F.
PR BUILDING 2
4,062 S.F.
2' GRAVEL SHOULDER (TYP.)
PROPANE TANK
CONSTRUCTION LIMITS
28,333 S.F.
0.65 ACRES
1
1
20.0'
20.0'
R3.0'
80.6'
79.9'
27.0'
12.0'
20.0'
20.0'
24.0'
24.0'
30.0'
15.0'
35.0'
12.0'
15.0'
15.0'
14.0' 10.0'
10.0'14.0'
R3.0'
R3.0'
28.0'
28.0'
R5.0'
R5.0'
R15.0'
58.0'
58.0'
PR LOT LINE
10.0'
15.0'
11
LUMBER & SUPPLY
SHEET:
ELEVATION
A1
ALTHOUGH EVERY EFFORT HAS
BEEN MADE IN PREPARING
THESE PLANS AND CHECKING
THEM FOR ACCURACY, THE
CONTRACTOR MUST CHECK
ALL DETAILS AND DIMENSIONS
AND BE RESPONSIBLE FOR
SAME. ALL CODE ISSUES ARE
THE RESPONSIBILITY OF THE
CONTRACTOR.
REVISIONS:
SCALE:
GARAGE SQ.FT.:
DRAWN BY:
DATE:
6-18-2024
PROJECT:
CONTRACTOR:
SISTER BAY CONDOS
CLASSIC CONSTRUCTION
ADDRESS: --
PRELIM.6-18-2024
HOUSE SQ.FT.:
3/8"=1'-0"
THESE PLANS ARE PROTECTED BY
COPYRIGHT LAW, AND ARE THE PROPERTY
OF DETERVILLE LUMBER & SUPPLY LLC.
ANY USE OF THESE PLANS WITHOUT
WRITTEN CONSENT IS PROHIBITED.
FOR CONSTRUCTION
FOR BID
X
KELLY S.
REV. 1 09-09-2025
12
LUMBER & SUPPLY
SHEET:
ELEVATION
A1-1
ALTHOUGH EVERY EFFORT HAS
BEEN MADE IN PREPARING
THESE PLANS AND CHECKING
THEM FOR ACCURACY, THE
CONTRACTOR MUST CHECK
ALL DETAILS AND DIMENSIONS
AND BE RESPONSIBLE FOR
SAME. ALL CODE ISSUES ARE
THE RESPONSIBILITY OF THE
CONTRACTOR.
REVISIONS:
SCALE:
GARAGE SQ.FT.:
DRAWN BY:
DATE:
6-18-2024
PROJECT:
CONTRACTOR:
SISTER BAY CONDOS
CLASSIC CONSTRUCTION
ADDRESS: --
PRELIM.6-18-2024
HOUSE SQ.FT.:
3/8"=1'-0"
THESE PLANS ARE PROTECTED BY
COPYRIGHT LAW, AND ARE THE PROPERTY
OF DETERVILLE LUMBER & SUPPLY LLC.
ANY USE OF THESE PLANS WITHOUT
WRITTEN CONSENT IS PROHIBITED.
FOR CONSTRUCTION
FOR BID
X
KELLY S.
REV. 1 09-09-2025
13
LUMBER & SUPPLY
4'-3"
2'-5 1/2"
12'-6"12'-6"12'-6"12'-6"
2'-5 1/2"
4'-3"2'-5 1/2"
9'-2"
25'-0"25'-0"
50'-0"
5'-7"5'-7"
1'-6"
5'-7"5'-7"
3'-0" 16'-0"11'-2"11'-2"
3'-3"
34'-2"
71'-0"
13'-5"10'-7"15'-1" 11'-1"
18'-0 3/8"
2'-8"2'-4"
5'-1"
2'-2"6'-0"8'-2"16'-10"7'-10"
5'-10"
4'-8"
2'-8"2'-4"
5'-1"
6'-0"8'-2"16'-10"7'-10" 2'-2"
14'-9 1/2"14'-9 1/2"
12'-1 1/16"
18'-11 3/8"
5'-0"41'-0"
72'-11"
77'-7"
5'-10"
4'-8"
41'-0"
56'-11"
77'-7"
5'-0"
24'-1"24'-1"
25'-1 1/2"
25'-1 1/2"
10'-7"15'-1" 11'-1"
18'-0 3/8"
18'-11 3/8"
13'-5"
12'-1 1/16"
7'-4 1/2" 10'-5"
4'-8 1/2"
6'-2"
7'7'
6'-2"
5'-11"8'-5 1/16"
5'-11"8'-5 1/16"
8'-4 15/16"
6'-0 1/2"
8'-4 15/16"6'-0 1/2"
13'-1 3/8" 4'-11"13'-1 3/8"4'-11"
34'-2"
68'-4"
9'-2"
108" X 83"108" X 83"
1
A3
10'-5"
7'-4 1/2"
2 13
NOTES:
1. STONE AT TERRACE, INCLUDING SIDES
2. WATER SPIGOT
3. PROVIDE GAS CONNECTION FOR
POTENTIAL FUTURE GRILL
16'-0"
2
A3
2'-6"2'-6"
3'-0"
3'-0"
1'-6"
3'-0"
3'-3"
3'-0" 5'-0" 5'-0" 3'-0"
16'-0"
1'-6"
1'-6"
CONCRETE
PATIO
CONCRETE
PATIO
14'-1"14'-1"
108" X 83" 108" X 83"
36" X 66"
COTT. STYLE
D.H. WINDOW
36" X 66"
COTT. STYLE
D.H. WINDOW
36" X 66"
COTT. STYLE
D.H. WINDOW
5'-0"5'-0"
4'-9" 4'-9" 3'-3"
36" X 66"
COTT. STYLE
D.H. WINDOW
36" X 66"
COTT. STYLE
D.H. WINDOW
36" X 66"
COTT. STYLE
D.H. WINDOW
4'-9" 3'-3"
5'-0"
4'-9"
16'-0"
36" X 66"
COTT. STYLE
D.H. WINDOW
36" X 66"
COTT. STYLE
D.H. WINDOW
36" X 66"
COTT. STYLE
D.H. WINDOW
36" X 66"
COTT. STYLE
D.H. WINDOW
36" X 66"
COTT. STYLE
D.H. WINDOW
36" X 66"
COTT. STYLE
D.H. WINDOW
36" X 66"
COTT. STYLE
D.H. WINDOW
36" X 66"
COTT. STYLE
D.H. WINDOW
36" X 66"
COTT. STYLE
D.H. WINDOW
72" X 80"
SLIDING PATIO DOOR
36" X 66"
COTT. STYLE
D.H. WINDOW
72" X 80"
SLIDING PATIO DOOR
IMPORTANT NOTES:
ALL LARGE HEADERS, BEAMS, COLUMNS & WALL BRACING TO BE
SPEC'D. BY OTHERS
ALL EXT. WALL DIMENSIONS TO OUTSIDE OF STUD FACE
ALL FINAL WINDOW AND DOOR R.O. PER CONTRACTOR
IT IS UNDERSTOOD THAT THE UNIFORM DWELLING CODE
AND LAYOUT DRAWINGS FOR FLOOR AND ROOF TRUSSES
SHALL TAKE FINAL PRECEDENCE OVER THESE PLANS
BUILDING INFORMATION
PER SIDE:
1ST FLOOR SQ.FT. : 1387
2 ND FLOOR SQFT. : 1307
BONUS ROOM SQFT. : 329
GARAGE SQ.FT.: 636
1ST. FLR. WALL HEIGHT: 9' 1-1/8"
2ND FLR. WALL HEIGHT: 8'-1-1/8"
SHEET:
FLOOR PLAN
A2
ALTHOUGH EVERY EFFORT HAS
BEEN MADE IN PREPARING
THESE PLANS AND CHECKING
THEM FOR ACCURACY, THE
CONTRACTOR MUST CHECK
ALL DETAILS AND DIMENSIONS
AND BE RESPONSIBLE FOR
SAME. ALL CODE ISSUES ARE
THE RESPONSIBILITY OF THE
CONTRACTOR.
REVISIONS:
SCALE:
GARAGE SQ.FT.:
DRAWN BY:
DATE:
6-18-2024
PROJECT:
CONTRACTOR:
SISTER BAY CONDOS
CLASSIC CONSTRUCTION
ADDRESS: --
PRELIM.6-18-2024
HOUSE SQ.FT.:
3/16"=1'-0"
THESE PLANS ARE PROTECTED BY
COPYRIGHT LAW, AND ARE THE PROPERTY
OF DETERVILLE LUMBER & SUPPLY LLC.
ANY USE OF THESE PLANS WITHOUT
WRITTEN CONSENT IS PROHIBITED.
FOR CONSTRUCTION
FOR BID
X
KELLY S.
REV. 109-09-2025
14
LUMBER & SUPPLY
9'-5 13/16"3'-9"
3'-4 1/2"
3'-4 1/2"3'-4 1/2"
3'-4 1/2"
9'-5 13/16"9'-5 11/16"
1'-4"
9'-5 11/16"
18'-11 1/2"
6'-9"9'-5"6'-9"3'-9"
18'-11 1/2"
4'-8 1/2"4'-8 1/2"
4'-9 1/2"6'-6 1/2"6'-6 1/2"
13'-1"13'-0 15/16"
6'-6 3/8"6'-6 1/2"
5'-7"5'-7"
4'-9 1/2"
68'-4"
15'-0 1/2"
10'-10 1/2"
14'-9 1/2"
8'-5 1/2"
6'-1"
17'-5"
15'-4"
3'-8"
9'-9"
4'-1"
25'-1 1/2"
14'-3 9/16"
25'-1 1/2"
14'-3 1/2"
5'-7"
4'-1"
12'-2"
6'-1"
8'-5 1/2"
5'-4"
14'-9 3/8"
10'-10 1/2"
15'-0 1/2"
15'-4"
3'-8"
34'-2"34'-2" 1'-4"
71'-0"
2'-6 11/16"2'-6 11/16"
3'-4 3/8"3'-4 3/8"
5'-11"5'-11"
34'-2"34'-2"
10'-6"
7'-9 1/2" 16'-10" 8'-2" 6'-0" 2'-2 1/2"
5'-1"
2'-3 1/2"
1'-6"
1'-6"
2'-8 1/2"
2'-8 1/2"
2'-3 1/2"
5'-1"
2'-2 1/2"6'-0"8'-2"16'-10"7'-9 1/2"
10'-6"
5'-0"41'-0"
61'-7"
5'-0"41'-0"
61'-7"
51'-1"
51'-1"
4'-9 1/2"
9'-7"
4'-9 1/2"
9'-7"
5'-4"
6'-0 1/2"
2'-1"
6'-0 3/8"
2'-1"
4'-1 1/2"
1'-6 1/2"
9'-8 7/8"
10'-0"
2
A3
12'-2"
5'-7"
4'-1 1/2"
1'-6 1/2"
5/0
2'-1"
5/0
2'-1"
10'-0"
2/8
2/8
2/82/8
2/8
5/0
14'-1"
14'-1"
2'-1"
5/0
11'
11'
3/0
3/0
2/8
3/0
3/0
2/8
2/8
2/8
2/8
2/82/8
2'-1"
15'-2 1/2" 15'-2 1/2"
5'-9 7/16"5'-9 7/16"
14'-1"
17'-5"
14'-1"
IMPORTANT NOTES:
ALL LARGE HEADERS, BEAMS, COLUMNS & WALL BRACING TO BE
SPEC'D. BY OTHERS
ALL EXT. WALL DIMENSIONS TO OUTSIDE OF STUD FACE
ALL FINAL WINDOW AND DOOR R.O. PER CONTRACTOR
IT IS UNDERSTOOD THAT THE UNIFORM DWELLING CODE
AND LAYOUT DRAWINGS FOR FLOOR AND ROOF TRUSSES
SHALL TAKE FINAL PRECEDENCE OVER THESE PLANS
BUILDING INFORMATION
PER SIDE:
1ST FLOOR SQ.FT. : 1387
2 ND FLOOR SQFT. : 1307
BONUS ROOM SQFT. : 329
GARAGE SQ.FT.: 636
1ST. FLR. WALL HEIGHT: 9' 1-1/8"
2ND FLR. WALL HEIGHT: 8'-1-1/8"
SHEET:
2ND FLOOR
A2-1
ALTHOUGH EVERY EFFORT HAS
BEEN MADE IN PREPARING
THESE PLANS AND CHECKING
THEM FOR ACCURACY, THE
CONTRACTOR MUST CHECK
ALL DETAILS AND DIMENSIONS
AND BE RESPONSIBLE FOR
SAME. ALL CODE ISSUES ARE
THE RESPONSIBILITY OF THE
CONTRACTOR.
REVISIONS:
SCALE:
GARAGE SQ.FT.:
DRAWN BY:
DATE:
PROJECT:
CONTRACTOR:
ADDRESS: --
PRELIM.
HOUSE SQ.FT.:
THESE PLANS ARE PROTECTED BY
COPYRIGHT LAW, AND ARE THE PROPERTY
OF DETERVILLE LUMBER & SUPPLY LLC.
ANY USE OF THESE PLANS WITHOUT
WRITTEN CONSENT IS PROHIBITED.
FOR CONSTRUCTION
FOR BID
X
6-18-2024
6-18-2024
3/16"=1'-0"
KELLY S.
SISTER BAY CONDOS
CLASSIC CONSTRUCTION
REV. 109-09-2025
15
LUMBER & SUPPLY
1/2" DRYWALL
2X4 STUD
5/8" DRYWALL
1/2" DRYWALL
2X4 STUD
1"RESILIENT CHANNEL
1/2" SOUND BOARD
1" AIR GAP
6" MAX
2'-0" TYP.
1/2"3 1/2"
5/8"
3 1/2"1/2"
1"
1/2"
1"
4'-8"
0'-11 1/4"
INSULATION PER CONTRACTOR
VAPOR BARRIER
PROPER VENTS
5/8" FC DRYWALL CEILING
8/12 PITCH ROOF TRUSSES PER MANUF
1/2" OSB SHEATHING & 15# ASTM FELT
30 YR. DIM. SHINGLES WITH CONT. RIDGE VENT
HEADERS PER SCHEDULE
2X6 EXTERIOR WALLS
7/16" OSB SHEATHING
TYVEK HOUSE WRAP
INSULATION BY CONTRACTOR
VAPOR BARRIER
1/2" DRYWALL INTERIOR
1.5" FOAM
D-4 VINYL SIDING
DRAIN TILE & STONE
PER CODE REG.
ALL CODE REQUIREMENTS ARE THE
RESPONSIBILITY OF THE CONTRACTOR
9'-1 1/8"
HEEL HGT.
1'-0"
3/4" SUB FLOOR
TREATED 2 X 4 SLEEPERS @ 24" O.C. W/
1-1/2" RIGID FOAM TIGHT IN BETWEEN
4" REINFORCED CONCRETE FLOOR
2" RIGID FOAM
8'-1 1/8"
1'-6"
3/4" SUBFLOOR
18" FLOOR TRUSSES
5/8" FC DRYWALL CEILING
SECTIONS
& DETAILS
SHEET:
A3
ALTHOUGH EVERY EFFORT HAS
BEEN MADE IN PREPARING
THESE PLANS AND CHECKING
THEM FOR ACCURACY, THE
CONTRACTOR MUST CHECK
ALL DETAILS AND DIMENSIONS
AND BE RESPONSIBLE FOR
SAME. ALL CODE ISSUES ARE
THE RESPONSIBILITY OF THE
CONTRACTOR.
REVISIONS:
SCALE:
GARAGE SQ.FT.:
DRAWN BY:
DATE:
PROJECT:
CONTRACTOR:
ADDRESS:
PRELIM.
HOUSE SQ.FT.:
1-1/2"=1"-0"
THESE PLANS ARE PROTECTED BY
COPYRIGHT LAW, AND ARE THE PROPERTY
OF DETERVILLE LUMBER & SUPPLY LLC.
ANY USE OF THESE PLANS WITHOUT
WRITTEN CONSENT IS PROHIBITED.
FOR CONSTRUCTION
FOR BID
X
6-18-2024
SISTER BAY CONDOS
CLASSIC CONSTRUCTION
6-18-2024
KELLY S.
REV. 1 09-09-2025
16
LUMBER & SUPPLY
3'-6"3'-6"18'-0"3'-6" 18'-0" 3'-6"
9'-2"
4'-8"
5'-10" 41'-0" 5'-1" 5'-0"
56'-11"
77'-7"
25'-0"25'-0"
9'-2"
68'-4"
14'-10"
14'-10"
34'-11"
34'-11"
17'-9 13/16"17'-9 13/16"
1'
2
A3
7'-0" 9'-0"
16'-0"14'-2"
9'-10"9'-10" 2'-8"2'-8"
14'-2"16'-0"
1'-6"
4'-8"
5'-10" 41'-0" 5'-1" 5'-0"
16'-0"56'-11"
77'-7"
1'-6" 1'-4"1'-4" 1'-6"
35'-6"35'-6"
2'-6"2'-6"
16'-0"
71'-0"
IMPORTANT NOTES:
ALL LARGE HEADERS, BEAMS, COLUMNS & WALL BRACING TO BE
SPEC'D. BY OTHERS
ALL EXT. WALL DIMENSIONS TO OUTSIDE OF STUD FACE
ALL FINAL WINDOW AND DOOR R.O. PER CONTRACTOR
IT IS UNDERSTOOD THAT THE UNIFORM DWELLING CODE
AND LAYOUT DRAWINGS FOR FLOOR AND ROOF TRUSSES
SHALL TAKE FINAL PRECEDENCE OVER THESE PLANS
BUILDING INFORMATION
PER SIDE:
1ST FLOOR SQ.FT. : 1387
2 ND FLOOR SQFT. : 1307
BONUS ROOM SQFT. : 329
GARAGE SQ.FT.: 636
1ST. FLR. WALL HEIGHT: 9' 1-1/8"
2ND FLR. WALL HEIGHT: 8'-1-1/8"
SHEET:
FND. PLAN
S1
ALTHOUGH EVERY EFFORT HAS
BEEN MADE IN PREPARING
THESE PLANS AND CHECKING
THEM FOR ACCURACY, THE
CONTRACTOR MUST CHECK
ALL DETAILS AND DIMENSIONS
AND BE RESPONSIBLE FOR
SAME. ALL CODE ISSUES ARE
THE RESPONSIBILITY OF THE
CONTRACTOR.
REVISIONS:
SCALE:
GARAGE SQ.FT.:
DRAWN BY:
DATE:
PROJECT:
CONTRACTOR:
ADDRESS:
PRELIM.
HOUSE SQ.FT.:
THESE PLANS ARE PROTECTED BY
COPYRIGHT LAW, AND ARE THE PROPERTY
OF DETERVILLE LUMBER & SUPPLY LLC.
ANY USE OF THESE PLANS WITHOUT
WRITTEN CONSENT IS PROHIBITED.
FOR CONSTRUCTION
FOR BID
X
6-18-2024
--
6-18-2024
3/16"=1'-0"
KELLY S.
SISTER BAY CONDOS
CLASSIC CONSTRUCTION
REV. 109-09-2025
17
Page 1
STAFF REPORT
Date: May 26, 2026
To: Plan Commission
Re: Revised Site Plan/Plat Submission; Luna View Development; 399 Maple Drive
Author(s): Benjamin Andrews, Village Administrator
Action(s) Requested: ☐ Ordinance ☐ Resolution ☒ Motion ☒ Receive/File
BACKGROUND INFORMATION
The Village has received a revised site plan and plat submission for the Luna View Development
at 399 Maple Drive, proposing modifications to elements previously approved by the Plan
Commission in October 2025 and in corporated into the Village’s Development Agreement with
Packerland Builders LLC.
The revisions include reassigning the rooftop de ck associated with Unit 30 from a common
element to a limited common element specific to that unit, as well as adjustments to the
configuration and designation of guest parking spaces. Applicant Allen Gokey explained that the
rooftop reassignment is driven by insurance liability considerations, noting that keeping the area
as common space significantly increased the asso ciation's insurance costs, whereas assigning it
to Unit 30 transfers liability to the individual owner and reduces shared expenses. He clarified
that no change to the rooftop’s physical footprint or square footage is proposed.
Staff also received correspondence from a neighboring property owner identifying discrepancies
between earlier renderings and approved plans, particularly regarding rooftop features. Staff
acknowledged that certain languages within the existing Development Agreement were
ambiguous and that the amendment process provides an appropriate opportunity to clarify these
elements.
REVIEW
During its May 4, 2026 meeting, the Plan Co mmission reviewed the proposed revisions and
discussed concerns raised by commissioners and neighboring residents about the visibility of the
white rubber roof and rooftop me chanical equipment. The applic ant indicated a willingness to
mitigate the visual impacts by enclosing mechanical equipment and adding wood trim consistent
with the building's earth-tone aesthetic. The Commission expresse d support for these
18
Page 2
improvements and directed that these visual miti gation measures be incorporated as explicit
conditions within an amendment to the Development Agreement.
In accordance with the existing Development Agreement, any changes to the approved site plan,
floor plans, or parking layout must be reviewed by the Plan Commission, and substantive changes
require Village Board approval through a formal amendment.
The submitted revised condominium plat and re lated plans reflect the rooftop designation
change and guest parking updates, but do not contain narrative amendment language,
confirming that a separate written amendment remains necessary.
The amendment to the Development Agreement is available for the Plan Commission's review
as part of this agenda item, and the Commission will be asked to recommend it to the Village
Board for approval.
ATTACHMENTS
1. Amendment to Development Agreement
2. Site Plan
19
AMENDMENT TO THE ALLEN GOKEY – PACKERLAND BUILDERS, LLC 1
DEVELOPMENT AGREEMENT 2
2399 MAPLE DRIVE 3
4
THIS AGREEMENT is made and entered into this 16th day of June 2026, by and between the 5
Village of Sister Bay, Door County, Wisconsin, a Municipal Corporation (“the Village”), and ALLEN 6
GOKEY - PACKERLAND BUILDERS, LLC (“the Developer”). 7
8
RECITALS 9
10
WHEREAS, on May 26, 2026 , the Plan Commission reviewed the terms of the Development 11
Agreement between Village officials and ALLEN GOKEY - PACKERLAND BUILDERS, LLC which was 12
approved by the Village Board on November 29, 2022 , and amended on October 24, 2025 and, 13
recommended to the Village Board, that, if approved by the Board, the Development Agreement 14
dated November 29, 2022, Section 1 – VILLAGE APPROVALS , to amend the site plan to include 15
revisions to allow modifications to the unit 301 rooftop and revisions to additional parking areas , 16
attached hereto, as shown on the site plan reviewed by the Plan Commission on May 14, 2026 and 17
amend the approved building materials and colors to include a condition that the rooftop color is to 18
be mitigated from the existing white. 19
20
NOW, THEREFORE, the parties hereby agree that all the provisions of the previously mentioned 21
Development Agreement shall remain in full force and effect, but Section 1 – VILLAGE APPROVALS, 22
shall be amended as stated above. 23
24
(Please note that all of the documents previously approved are attached to the original Development 25
Agreement dated November 29, 2022.) 26
27
IN WITNESS WHEREOF, the Developer and the Village have caused this document to be signed 28
by their appropriate officers and their corporate seals to be hereunto affixed on the day and year first 29
above written. 30
31
[Signature page to follow] 32
33
20
Amendment to the Allen Gokey – Packerland Builders, LLC Development Agreement
2
DEVELOPER 1
Allen Gokey – Packerland Builders, LLC 2
By: 3
4
______________________________ 5
Allen Gokey, Agent 6
STATE OF WISCONSIN ) 7
) ss: 8
COUNTY OF _________ ) 9
10
Personally came before me this ______ day of ______________, 20 26, the above named A LLEN GOKEY, on 11
behalf of PACKERLAND BUILDERS, LLC, to me known to be the person who executed the foregoing instrument 12
and acknowledged the same. 13
14
_____________________________ 15
Notary Public, State of WI 16
My commission expires: _________ 17
18
19
20
VILLAGE OF SISTER BAY 21
By: 22
23
_____________________________ 24
Nate Bell 25
Village President 26
STATE OF WISCONSIN ) 27
) ss: 28
COUNTY OF DOOR ) 29
30
Personally came before me this _____ day of ____________, 20 26, the above named N ATE BELL , Village 31
President, of the above -named municipal corporation, to me known to be the person who executed the 32
foregoing instrument and to me known to be the Village President of said municipal corporation, who 33
acknowledged execution of the foregoing instrument as said officer as the deed of said municipal corporation 34
by its authority and pursuant to the authorization by the Village Board from their meeting on the 16th day of 35
June, 2026. 36
_____________________________ 37
Notary Public, State of WI 38
My commission expires: _______________ 39
40
41
21
7
108
LOT 4
LOT 5
BLOCK 6
UNITS
UNITS
UNITS
UNITS
UNIT 103
UNIT 102
UNIT 101
N16°34'03"E 150.16'
N13°14'23"W 73.01'
N80°49'49"E 181.38'
73.62'
S15°39'22"E
67.44'
S23°37'13"E
40.10'
S70°31'40"W
S64°45'20"W 123.48'
S71°22'49"W 151.14'
132.28'
9.85'
N19°00'00"W
23.38'
Sister Bluffs Estates Condominium
Yacht Club at Sister Bay Condo
40.79'
N85°41'00"E
Vacated Maple DriveDoc. #449850
25'
15'
Vacated Maple Drive
Maple Drive25'
25'
25'
Mill Road
4
5
Block 6
Village of Sister Bay Assessor's Plat No. 1
4
3
Block 6
Village of Sister Bay Assessor's Plat No. 1
Block 5
Village of Sister Bay Assessor's Plat No. 1
4
2
Retaining wall
Common Element
Common Element
Retaining wall
Retaining wall
Concrete
steps
Concrete curb
and gutter
Retaining wall
N71°00'00"E
42.47'
S19°00'00"E
43.65'
N19°00'00"W
25.55'
25.10'
98.38'
Common Element
5
6
Common Element
37.97'
44.66'
98.75'
22.62'
50.39'
9.01'N71°00'00"E
126.08'
27.59'
122.57'
206 & 306
205 & 305
204 & 304
203 & 303
Doc. #449852
Existing Village of Sister Baysewer and water easementDoc. #449850
40.0'
N23°37'25"W
114.02'
Found disturbed 1" pipe
N67°34'20"E, 1.15' from
true corner
Document #843952
Proposed foundation
EV/Guest
101
301
302
102
204
205
305
103
206
306
Guest
201
202
203
303
304
206
306
201 & 301
202 & 302
UNITS
UNITS
UNIT 301 -
ROOFTOP
Dumpsters
Guest
Guest
S19°00'00"E
35.86'
ALL OF LUNA VIEW CONDOMINIUM, HANGER 346, DOCUMENT NUMBER 865182, BEING ALL OF LOT'S 4, 5 AND 6, BLOCK 5,
VILLAGE OF SISTER BAY ASSESSOR'S PLAT NO. 1, HANGER A, PAGES 361 & 362, DOCUMENT NUMBER 451848, AND THAT PORTION
OF VACATED MAPLE DRIVE, DOCUMENT NUMBER 449850, ADJOINING SAID LOTS 5 AND 6, AND ALSO THAT PORTION DESCRIBED IN
DOCUMENT NUMBER 449852, DOOR COUNTY RECORDS, BEING PART OF GOVERNMENT LOT 4, SECTION 5, TOWNSHIP 31 NORTH,
RANGE 28 EAST, VILLAGE OF SISTER BAY, DOOR COUNTY, WISCONSIN
SHEET 1 OF 6
SURVEYOR'S CERTIFICATE:
I, Troy E. Hewitt, Professional Land Surveyor, do hereby certify that in accordance with State
Statute 703 that I have surveyed the within described property and that the survey is an
accurate representation of the exterior boundary and units thereof.
This condominium plat is a correct representation of the LUNA VIEW CONDOMINIUM FIRST
ADDENDUM, a condominium hotels/motels
development at the date hereof, and the
identification and location of each unit and
the common elements can be determined
from the plat.
Dated this April 6, 2026.
______________________________________
Troy E. Hewitt, PLS #2831
Professional Land Surveyor
ROBERT E. LEE & ASSOCIATES, INC.
LEGEND
LEGAL DESCRIPTION
All of Luna View Condominium, Hanger 346, Document Number 865182, being all of Lot's 4, 5 and 6, Block 5, Village of Sister Bay
Assessor's Plat No. 1, Hanger A, Pages 361 & 362, Document Number 451848, and that portion of vacated Maple Drive, Document
Number 449850, adjoining said Lots 5 and 6, and also that portion described in Document Number 449852, Door County Records, being
part of Government Lot 4, Section 5, Township 31 North, Range 28 East, Village of Sister Bay, Door Dounty, Wisconsin more fully
described as follows:
Commencing at the Southwest corner of said Section 5; thence S89°43'22"E, 1386.43 feet on the south line of the Southwest 14 of said
Section 5 to the southwesterly extension of the west line of said Lot 4; thence N16°34'03"E, 1142.09 feet on said southwesterly extension
to the southwest corner of said Lot 4, the POINT OF BEGINNING; thence continuing N16°34'03"E, 150.16 feet on said west line; thence
N13°14'23"W, 73.01 feet on said west line to the northwest corner thereof; thence N80°49'49"E, 181.38 feet on the north line of said Lot
4 and continuing on the north line of said Lot 5 to the northeast corner thereof; thence N85°41'00"E, 40.79 feet on the north line of lands
described in Document Number 843952 to the northeast corner thereof also being the northeast corner of lands described in Document
Number 449852; thence S15°39'22"E, 73.62 feet on the east line of said lands described in Document Number 843952; thence
S23°37'13"E, 67.44 feet on said east line to the southeast corner of said lands; thence S70°31'40"W, 40.10 feet on the south line of said
lands to the southeast corner of said Lot 6; thence S64°45'20"W, 123.48 feet on the south line of said Lot 6; thence S71°22'49"W, 151.14
feet on said south line and continuing on the south line of said Lot 4 to the Point of Beginning.
Said parcel contains 43,420 Square Feet (0.997 Acres) of land more or less.
Parcel subject to easements and restrictions of record.
Declared Area
Declarant: Packerland Builders LLC
60'0' 30'
SCALE: 1"= 30'
15'
Bearings are referenced to the Door County
Coordinate System. The south line of the
Southwest 14 of Section 5 bears S89°43'22"E.
N
EW
S
1. All areas within the condominium and
outside the units, except those areas
designated as limited common elements
(LCE) are common elements.
2. Balconies and patios (decks) are limited
common elements.
3. Building plans provided by declarant
do not represent as-built conditions.
4. Parking spaces may be allocated by
declarant. Parking spaces are identified
on this plat.
TOTAL UNITS
Total Units = 15 Units
CONDOMINIUM NOTES
R:\6200\6234\6234001\DWG\6234001_condo_first addendum.dwg
Point of Beginning
Declared Area
43,420 Sq. Ft.
0.997 Acres
There are no objections to this condominium plat with respect to Sec. 703.115 Wis. Stats.
and is hereby approved for the Village of Sister Bay
Dated this ___ day of _____________________, 2026.
________________________________________________________
Heidi Teich, Village Clerk
CERTIFICATE OF THE VILLAGE OF SISTER BAY
S89°43'22"E 2717.39'
N16°34'03"E1142.09'
1386.43' 1330.96'
Southwest Corner
Section 5, T31N-R28E
Found mag nail at
road surface
South 14 Corner
Section 5, T31N-R28E
Found Door County
monument
~ A RESIDENTIAL CONDOMINIUM ~
Existing 1" Iron Pipe
Existing 2" Iron Pipe
Government PLSS Monument
Units 201 -206 & 301-306
Units 101-103
Unit 301 - Roof
LUNA VIEW CONDOMINIUM FIRST ADDENDUM
22
2
S1.1
4
S1.2
3
S1.1
1
S1.1
1
S1.2
5
S1.2
6
S1.1
6
S1.2
5
S1.1
2
S1.2
4
S1.1
3
S1.2
14'-4"
(TYP)
3'-8"
(TYP)
14'-4"
(TYP)
3'-8"
STEP
STEP
STEP
STEP
STEP
STEP STEP
STEP
STEP
STEP
STEP
STEP
STEP STEP
STEP
STEP
STEP
STEP
STEP
STEP
STEP
STEP
STEP
STEP
STEP
STEP
STEP
STEP STEP STEP
STEP
STEP
STEP
STEP
STEP STEP STEP STEP STEP
STEP
STEP
STEP
STEP
STEP
STEP
STEP
STEP
STEP
TW (102' - 10")
TF (99' - 6")
TW (104' - 10")
TF (96' - 0")
TW (109' - 0")
TW (109' - 8")
TW (110' - 8")
TW (113' - 8 1/4")
TF (99' - 6")
TW (113' - 3")
TW (113' - 3")
TW (113' - 8 1/4")
TW (113' - 8 1/4")
TW (113' - 8 1/4")
TW (100' - 0")
TW (111' - 8")
TW (109' - 8")
TW (107' - 8")
TW (106' - 0")
TW (106' - 0")
TW (100' - 0")
TL (111' - 9 3/4")
TL (99' - 4")
TF (96' - 0")
TW (100' - 0")
TF (97' - 9")
TF (99' - 6")
TF (96' - 0")
TF (99' - 6")
TF (97' - 3")
TF (95' - 0")
TF (107' - 8")
TF (99' - 6")
TF (96' - 0")
TF (99' - 6")
TF (96' - 0")
TF (96' - 0")
TF (99' - 6")
TF (96' - 0")
TF (96' - 0")
TF (99' - 6")
TF (96' - 0")
TF (96' - 0")
TF (99' - 6")
TF (96' - 0")
TF (94' - 6")
TW (100' - 0")
TW (100' - 0")
TW (100' - 0") TW (100' - 0") TW (100' - 0")
TW (111' - 9 3/4")
TF (107' - 8")
TF (99' - 6")
TW (111' - 9 3/4")
TF (107' - 8")
TF (99' - 6")
TW (111' - 9 3/4")
TF (107' - 8")
TF (99' - 6")
TW (111' - 9 3/4")
TF (98' - 0")
TF (99' - 6")
TF (104' - 2")
TF (105' - 11")
TW (111' - 9 3/4")
TF (104' - 2")
TF (107' - 8")
TF (108' - 6")
TF (106' - 4")
TF (110' - 8")
TW (113' - 3") TW (113' - 3") TW (113' - 3") TW (113' - 3")
TF (98' - 0")
TF (99' - 6")
TF (104' - 2")
TF (104' - 2")
TF (107' - 8")
TF (105' - 1 1/4")
TF (102' - 6 1/2")
TF (99' - 11 3/4")
TF (97' - 5")
TF (110' - 8")
TF (107' - 8")
TF (104' - 8")
TF (101' - 8")
TF (99' - 6")
TF (99' - 6")
TF (99' - 6")
TF (99' - 6")
20'-4" 32'-4" 18'-0" 18'-0" 18'-0" 23'-3 1/2" 11'-7 1/2"
10'-2"
5'-8 1/2"
2'-6"
28'-2 1/2" 13'-8 1/2" 11'-7 1/2"
4'-10"
7'-1 1/2"
5'-6" 2'-10 1/2"
18'-0" 18'-0" 18'-0" 18'-0" 18'-4 1/2"
17'-5"
20'-9"
12'-0"
6'-9 1/2" 18'-0"
1'-0"
1'-0"
1'-0"
6'-6"
8'-0"
2'-0"
FIREPLACE
2'-0"
22'-8 1/2"
4'-8 1/2" 1'-5 1/2"
84" x Ø4" STEEL BALLARDS
SET IN Ø18" CONC. FTG.
4" CONC. SLAB W/ 6x6 WWF
ON 6 MIL VB ON 2" RIGID INSUL.
ON 12" GRANULAR FILL
TOP SLAB: ELEV. = 100'-0"
4" CONC. SLAB W/ 6x6 WWF
ON 6 MIL VB ON 2" RIGID INSUL.
ON 12" GRANULAR FILL
TOP SLAB: ELEV. = 100'-0"
4" CONC. SLAB W/ 6x6 WWF
ON 6 MIL VB ON 2" RIGID INSUL.
ON 12" GRANULAR FILL
TOP SLAB: ELEV. = 100'-0"
4" CONC. SLAB W/ 6x6 WWF
ON 6 MIL VB ON 2" RIGID INSUL.
ON 12" GRANULAR FILL
TOP SLAB: ELEV. = 100'-0"
4" CONC. SLAB W/ 6x6 WWF
ON 6 MIL VB ON 2" RIGID INSUL.
ON 12" GRANULAR FILL
TOP SLAB: ELEV. = 100'-0"
4" CONC. SLAB W/ 6x6 WWF
ON 6 MIL VB ON 2" RIGID INSUL.
ON 12" GRANULAR FILL
TOP SLAB: ELEV. = 100'-0"
2'-0"
3'-0"
3'-0"
5'-6"
3'-0"
3'-0"
3'-0"
TF (96' - 6")
TF (98' - 0")
TF (99' - 6")
27'-9 1/2"
TF (99' - 6")
TW (100' - 0")
(TYP)
3'-3"
(TYP)
2'-10"
SUMP
4" CONC.
SLAB
W/ 6x6 WWF
ON 6 MIL VB
TOP SLAB:
ELEV. = 108'-0"
4" CONC.
SLAB
W/ 6x6 WWF
ON 6 MIL VB
TOP SLAB:
ELEV. = 108'-0" 4" CONC.
SLAB
W/ 6x6 WWF
ON 6 MIL VB
TOP SLAB:
ELEV. = 108'-0"
ELEVATOR
PIT
STAIRWELL
STAIRWELL
6
S1.1
SIM
6
S1.1
SIM
6
S1.1
SIM
6
S1.1
SIM
6
S1.1
SIM
2
S1.2
SIM
2
S1.2
SIM
2
S1.2
SIM
2
S1.2
SIM
TYP
3
S1.1
SIM
3
S1.1
SIM
3
S1.1
SIM
3
S1.1
SIM
3
S1.2
SIM
3
S1.2
SIM
3
S1.2
SIM
1
S1.2
SIM
3
S1.2
SIM
4" CONC.
SLAB
W/ 6x6 WWF
ON 6 MIL VB
TOP SLAB:
ELEV. = 104'-8"
TF (98' - 0")
TW (100' - 0")
TF (94' - 6")
TW (104' - 0")
TF (98' - 0")TW (98' - 6")
TL (97' - 10")
TF (94' - 6")
STEP
7
S1.2
TF (104' - 2")
TW (107' - 8")
TF (96' - 3")
TF (98' - 0")
TF (98' - 0")
TF (99' - 6")
TW (109' - 8")
4
S1.3
4
S1.3
7'-6"
10'-0"2'-0"
2'-4"2'-4"
(TYP.)
1'-6"
4'-0"
5'-10"
5'-0"
2'-0"
5'-0"
3'-0"
2'-0"
5'-0"
3'-0"
5'-0"
2'-4"
3'-0"
2'-4"
5'-6"
1'-6" 2'-4"2'-8"
2'-4"
4'-0"
5'-6"
2'-8"
1'-0"
3'-8"
2'-0"
2'-4"
1'-4"
3'-0"
TL (111' - 8 1/4")
TL (113' - 8 3/4")
1'-6"
2'-4"
TW (111' - 9 3/4")
TF (95' - 0")
TW (107' - 4")
4" CONC.
SLAB
W/ 6x6 WWF
ON 6 MIL VB
TOP SLAB:
ELEV. = 108'-0"
STEP
STEP
4" CONC.
SLAB
W/ 6x6 WWF
ON 6 MIL VB
TOP SLAB:
ELEV. = 108'-0"
TW (107' - 4")
STEP
STEP
TW (107' - 4")
STEP
STEP
TW (107' - 4")
STEP
STEP
TW (104' - 2")
TW (113' - 3")
4'-8"
6'-4"
TW (111' - 9 3/4")
TW (111' - 9 3/4") TW (111' - 9 3/4") TW (111' - 9 3/4")
3'-4"
3'-4"
3'-4"
3'-4"
3'-0"
BLOCK OUT OPENING
IN FOUNDATION FOR SANITARY
SEWER. VERIFY LOCATION
STORM
SEWER
SHOWER
RECESS
SHOWER
RECESS
SHOWER
RECESS
TOP SLAB:
ELEV.=98'-6"
TOP SLAB:
ELEV.= 95'-0"
10"
Foundation Plan
NNot to Scale
SHEET 2 OF 6 R:\6200\6234\6234001\DWG\6234001_condo_first addendum.dwg
ALL OF LUNA VIEW CONDOMINIUM, HANGER 346, DOCUMENT NUMBER 865182, BEING ALL OF LOT'S 4, 5 AND 6, BLOCK 5, VILLAGE OF SISTER BAY ASSESSOR'S PLAT
NO. 1, HANGER A, PAGES 361 & 362, DOCUMENT NUMBER 451848, AND THAT PORTION OF VACATED MAPLE DRIVE, DOCUMENT NUMBER 449850, ADJOINING SAID
LOTS 5 AND 6, AND ALSO THAT PORTION DESCRIBED IN DOCUMENT NUMBER 449852, DOOR COUNTY RECORDS, BEING PART OF GOVERNMENT LOT 4, SECTION 5,
TOWNSHIP 31 NORTH, RANGE 28 EAST, VILLAGE OF SISTER BAY, DOOR COUNTY, WISCONSIN
LUNA VIEW CONDOMINIUM FIRST ADDENDUM
Declarant: Packerland Builders LLC
~ A RESIDENTIAL CONDOMINIUM ~
23
Storage
Stairs
Elevator
Stairs
Mech
Kitchen
Office
Bedroom Living
Bath
Lobby / Lounge Bedroom/Liv Rm
Crawl Space 1 Crawl Space 2 Crawl Space 3 Crawl Space 4 Crawl Space 5
Dumpsters
1 1st Floor Plan
A1.1 N
Storage
Patio Patio
Patio
Kitchen
Bath
Office
Living Bedroom
Hall
Exit
42" GB TP
36" GB
PTD
CHANGING
Unisex HC
FP
EL. (619.0')
EL. 98-6" EL. 98-6"
EL. 100-0"
EL. 100-0"
EL. (617.5') EL. (617.5')
EL. 100-0" EL. 100-0"
ADA
Bath36" GB
42" GB TP
Not to Scale
SHEET 3 OF 6 R:\6200\6234\6234001\DWG\6234001_condo_first addendum.dwg
UNIT 101
406 Sq. Ft.
UNIT 102
829 Sq. Ft.
UNIT 103
832 Sq. Ft.
Common Element
Common Element
Common Element
Common Element
Common Element
LCE LCE LCE
Common Element
ALL OF LUNA VIEW CONDOMINIUM, HANGER 346, DOCUMENT NUMBER 865182, BEING ALL OF LOT'S 4, 5 AND 6, BLOCK 5, VILLAGE OF SISTER BAY ASSESSOR'S PLAT
NO. 1, HANGER A, PAGES 361 & 362, DOCUMENT NUMBER 451848, AND THAT PORTION OF VACATED MAPLE DRIVE, DOCUMENT NUMBER 449850, ADJOINING SAID
LOTS 5 AND 6, AND ALSO THAT PORTION DESCRIBED IN DOCUMENT NUMBER 449852, DOOR COUNTY RECORDS, BEING PART OF GOVERNMENT LOT 4, SECTION 5,
TOWNSHIP 31 NORTH, RANGE 28 EAST, VILLAGE OF SISTER BAY, DOOR COUNTY, WISCONSIN
LUNA VIEW CONDOMINIUM FIRST ADDENDUM
Declarant: Packerland Builders LLC
~ A RESIDENTIAL CONDOMINIUM ~
24
Deck Deck Deck Deck Deck Deck
1 2nd Floor Plan
Walkway
Stairs
Bedroom
Bath
Kitchen
Bedroom
Bedroom
Bath
Bath
Kitchen
Stairs
Elevator
Kitchen
Bath
Bedroom
A1.2 N
Kitchen
Bath
Bedroom
Kitchen
Bath
Bedroom
Kitchen
Bath
Bedroom
Not to Scale
SHEET 4 OF 6 R:\6200\6234\6234001\DWG\6234001_condo_first addendum.dwg
UNIT 201
791 Sq. Ft.
Common Element
Common Element
Common Element
Common Element
LCE LCE LCE LCE LCE LCE
UNIT 202
767 Sq. Ft.
UNIT 203
767 Sq. Ft.
UNIT 204
767 Sq. Ft.
UNIT 205
767 Sq. Ft.
UNIT 206
1,046 Sq. Ft.
ALL OF LUNA VIEW CONDOMINIUM, HANGER 346, DOCUMENT NUMBER 865182, BEING ALL OF LOT'S 4, 5 AND 6, BLOCK 5, VILLAGE OF SISTER BAY ASSESSOR'S PLAT
NO. 1, HANGER A, PAGES 361 & 362, DOCUMENT NUMBER 451848, AND THAT PORTION OF VACATED MAPLE DRIVE, DOCUMENT NUMBER 449850, ADJOINING SAID
LOTS 5 AND 6, AND ALSO THAT PORTION DESCRIBED IN DOCUMENT NUMBER 449852, DOOR COUNTY RECORDS, BEING PART OF GOVERNMENT LOT 4, SECTION 5,
TOWNSHIP 31 NORTH, RANGE 28 EAST, VILLAGE OF SISTER BAY, DOOR COUNTY, WISCONSIN
LUNA VIEW CONDOMINIUM FIRST ADDENDUM
Declarant: Packerland Builders LLC
~ A RESIDENTIAL CONDOMINIUM ~
25
3rd Floor Plan
N
Deck Deck Deck Deck Deck Deck
1
Stairs
Stairs
Elevator
A1.3
Walkway
Living
Kitchen
Bath
Bedroom
Living
Kitchen
Bath
Bedroom
Living
Kitchen
Bath
Bedroom
Living
Kitchen
Bath
Bedroom
Bath
Kitchen
Bedroom
Bath
Bedroom
Kitchen
Bath
Bedroom
Not to Scale
SHEET 5 OF 6 R:\6200\6234\6234001\DWG\6234001_condo_first addendum.dwg
UNIT 301
1,302 Sq. Ft.
Common Element
Common Element
Common Element
Common Element
LCE LCE LCE LCE LCE LCE
UNIT 302
767 Sq. Ft.
UNIT 303
767 Sq. Ft.
UNIT 304
767 Sq. Ft.
UNIT 305
767 Sq. Ft.
UNIT 306
1,046 Sq. Ft.
ALL OF LUNA VIEW CONDOMINIUM, HANGER 346, DOCUMENT NUMBER 865182, BEING ALL OF LOT'S 4, 5 AND 6, BLOCK 5, VILLAGE OF SISTER BAY ASSESSOR'S PLAT
NO. 1, HANGER A, PAGES 361 & 362, DOCUMENT NUMBER 451848, AND THAT PORTION OF VACATED MAPLE DRIVE, DOCUMENT NUMBER 449850, ADJOINING SAID
LOTS 5 AND 6, AND ALSO THAT PORTION DESCRIBED IN DOCUMENT NUMBER 449852, DOOR COUNTY RECORDS, BEING PART OF GOVERNMENT LOT 4, SECTION 5,
TOWNSHIP 31 NORTH, RANGE 28 EAST, VILLAGE OF SISTER BAY, DOOR COUNTY, WISCONSIN
LUNA VIEW CONDOMINIUM FIRST ADDENDUM
Declarant: Packerland Builders LLC
~ A RESIDENTIAL CONDOMINIUM ~
26
Roof Plan
A1.4 N
1
C D D D D D
A
A B A B A B A B B
A
A
D D D D D D
C C A
A
A
A
A
A
A
Not to Scale
SHEET 6 OF 6 R:\6200\6234\6234001\DWG\6234001_condo_first addendum.dwg
UNIT 301
1302 Sq. Ft.
ALL OF LUNA VIEW CONDOMINIUM, HANGER 346, DOCUMENT NUMBER 865182, BEING ALL OF LOT'S 4, 5 AND 6, BLOCK 5, VILLAGE OF SISTER BAY ASSESSOR'S PLAT
NO. 1, HANGER A, PAGES 361 & 362, DOCUMENT NUMBER 451848, AND THAT PORTION OF VACATED MAPLE DRIVE, DOCUMENT NUMBER 449850, ADJOINING SAID
LOTS 5 AND 6, AND ALSO THAT PORTION DESCRIBED IN DOCUMENT NUMBER 449852, DOOR COUNTY RECORDS, BEING PART OF GOVERNMENT LOT 4, SECTION 5,
TOWNSHIP 31 NORTH, RANGE 28 EAST, VILLAGE OF SISTER BAY, DOOR COUNTY, WISCONSIN
LUNA VIEW CONDOMINIUM FIRST ADDENDUM
Declarant: Packerland Builders LLC
~ A RESIDENTIAL CONDOMINIUM ~
27
Page 1
STAFF REPORT
Date: May 26, 2026
To: Plan Commission
Re: Zoning Code Interpretation; Temporary Banner Display Request
Ben Ehlers; Chop; 2345 Mill Rd
Author(s): Benjamin Andrews, Village Administrator
Action(s) Requested: ☐ Ordinance ☐ Resolution ☒ Motion ☒ Receive/File
BACKGROUND INFORMATION
On April 20, 2026, the Village received a sign pe rmit application from Ben Ehlers, submitted on
behalf of Chop, for the property at 2345 Mill Road. The application seeks approval to use a
temporary banner displayed daily during the esta blishment’s lunch hours, then removed each
day after that period. Although the zoning code does permit the use of banner signs as temporary
signage, the applicant’s proposed use does not fully align with the way temporary signage is
defined and regulated within the Village’s zoning code.
REVIEW
According to Section 66.0508(4)(c), banner signs are categorized as temporary signs. Temporary
signs are permitted only when they relate to a specific, time-limited event and must be removed
within the timeframe prescribed by the ordinance. The code specifies the following:
• Section 66.0508(4)(c)1 – Temporary signs may be installed no more than 7 days before an
event.
• Section 66.0508(4)(c)2 – Temporary signs must be removed within 1 day after the event.
• Section 66.0508(4)(c)3 – Temporar y banners are limited to a maximum size of 12 square
feet per face, and 24 square feet total.
• Section 66.0508(4)(c)4–5 – Placement must m eet required setbacks and cannot obstruct
visibility or create hazards.
These provisions are written around event-based, short-duration displays. The zoning code does
not consider or authorize the recurring, daily use of a temporary banner for general business
advertising over an extended period.
28
Page 2
INTERPRETATION
Village Staff is requesting that the Plan Commission provide additional input on the intended use,
though, technically, temporary in a physical sense, it is functionally long-term. The zoning code
does not explicitly permit temporary signs to function as recurring business signage.
The interpretive gap exists in two areas:
1. Duration and Intent (Section 66.0508(4)(c)1–2) – The ordinance anticipates a one-time
event with a limited window for display. Th e applicant’s request for daily use over a
continuous period does not align with this event-based structure.
2. Definition of Temporary (Section 66.0508(4)(c)) – The code does not provide guidance on
whether daily removal and reinstallation ov er weeks or months maintains a sign’s
temporary status or creates a de facto ongoing advertising device.
These gaps make it unclear whether the applicant’s proposal can be approved under the existing
ordinance.
Based on the structure and intent of the temporary sign regulations in Section 66.0508(4)(c),
staff’s interpretation is that the applicant’s proposed use does not fully match the requirements
or intent of the code. While the banner would be removed daily, its repeated and predictable
daily use for generalized business advertising appears inconsistent with the ordinance’s
restrictions on temporary signage.
ATTACHMENT(S)
1. APPLICATION_26-023_Ben Ehlers_Chop_2345 Mill Rd_Chop Restaurant_Sign Permit
29
30
31
32
33
34
35
36
Page 1
STAFF REPORT
Date: May 26, 2026
To: Plan Commission
Re: Site Plan Review; Lure; 10627 N Bay Shore Drive
Author(s): Benjamin Andrews, Village Administrator
Action(s) Requested: ☐ Ordinance ☐ Resolution ☒ Motion ☒ Receive/File
POLICY ISSUE(S)
“Should the Village approve the proposed patio and retaining‑wall expansion at Lure Restaurant
(10627 N. Bay Shore Drive), located within the B‑3 Downtown Business District?”
BACKGROUND INFORMATION
Lure Restaurant has submitted a request to expand its outdoor patio area and extend an existing
retaining wall along the side of the property. The proposal includes:
• A 28’ × 16’ patio expansion (approximately 448 sq ft)
• Extension of the existing timber retaining wall
• Associated grading, drainage adjustments, and landscape changes
The property is zoned B ‑3 Downtown Business District and is al so located within the Historical
Overlay District, which requires an additional design compatibility review of materials,
appearance, and visual impact on the area's historic and waterfront character.
The scope of the project, specifically, modifica tion of site layout, expansion of impervious
surface, intensification of outdoor seating, and structural changes, requires Plan Commission Site
Plan Review before a zoning permit may be issued.
37
Page 2
DIMENSIONAL STANDARDS & SETBACKS
The Historic Overlay District regulations are in Sec. 66.0343. This overlay applies in addition to
the B-2 district rules unless explicitly modified. The overlay’s purpose is to preserve the historic
building pattern along the west side of N. Bay Shore Drive.
For new construction already conforming to B-2 setbacks:
• The Plan Commission may reduce the setbacks
• Setbacks may be based on setback averaging
• Setbacks may be set based on historic neighborhood patterns
The overlay intentionally allows smaller setbacks than standard B-2 where appropriate to
match historic context. The overlay also allows modifications under Sec. 66.0602.
PATIO AND EXPANSION
Based on a review of the Village of Sister Bay Zoning Code, including the provisions of the B ‑2
Downtown Business Transition District and the Historic Overlay District, any expansion of
outdoor seating on a patio constitutes an intensification of use that increases dining capacity and
therefore requires a mandatory reevaluation of parking. Under the Historic Overlay’s parking
requirements, expansions that increase requi red parking by up to 25% must add as many
additional on‑site stalls as physically possible, and ex pansions requiring more than 25% may be
approved only by special exception.
It is important to note that the site likely cannot physically provide the required additional stalls,
which would require a special exemption.
Further, the existing green space is only anticipated to be nominally increased.
38
39
40
41
42
43
44
45
46
47
Page 1
STAFF REPORT
Date: May 26, 2026
To: Plan Commission
Re: Courtesy Review; Friends of the Ice Rink; Ice Rink Reconstruction;
2155 Autumn Ct
Author(s): Benjamin Andrews
Action(s) Requested: ☐ Ordinance ☐ Resolution ☒ Direction ☒ Receive/File
Executive Summary
The Friends of the Sister Bay Ice Rink have s ubmitted a proposal to re construct the ice rink
facilities at the Sister Bay Sports Complex, seeking a courtesy review from the Plan Commission.
The project includes redevelopment of the existing rink area through the construction of two
full-size 85-by-200-foot hockey rinks, a resurfacer building, a cooler shed, associated equipment
yards, fencing, gates, and related utility and grading improvements.
All proposed elements remain within the footpr int of the existing concrete slabs and do not
expand the developed area of the complex. The Sports Complex is zoned P-1 Park District, which
accommodates public recreational uses and the accessory structures proposed by the applicant.
The project also aligns with requirements esta blished in the land lease agreement between the
Village and the Friends, which mandates completion of reconstruction by April 1, 2028.
Staff review indicates that the use, placement of buildings, and general site design are consistent
with zoning district expectatio ns, do not present setback or height conflicts, and appear
adequately supported by existing parking and ci rculation patterns. Staff recommends that the
Plan Commission provide feedback to guide preparation of the a pplicant’s final zoning permit
submission.
48
Page 2
PROJECT SUMMARY
The Friends of the Sister Bay Ice Rink have s ubmitted a request for a courtesy review of a
proposed reconstruction project at the Sister Bay Sports Complex. The project includes the
redevelopment of the ice rink facilities using the existing concrete slabs located on the site. The
proposal consists of two full ‑size 85-foot-by ‑200-foot hockey rinks, a resurfacer building
measuring approximately 30 by 50 feet, a cooler shed, equipment yard spaces, fencing, gates,
and related utility and grading adjustments. The improvements are intended to support
year‑round activation of the Sports Complex and e nhance the quality, safety, and functionality
of the Ice Rink. All improvements shown in the submitted engineering plans are located within
the boundaries of the existing ri nk area and do not expand the overall footprint of developed
recreation facilities.
BACKGROUND INFORMATION
The Sports Complex is zoned P‑1 Park District, which is intended to provide areas for green space,
public recreation, and community amenities. Recreational uses, such as ice rinks and supporting
structures, are compatible with the district's stated purpose, which emphasizes meeting the
community’s recreational needs without undue im pact on surrounding areas. The zoning code
identifies public parks, recreati onal fields, playgrounds, and simila r facilities as permitted uses,
and explicitly allows accessory buildings that support those uses.
The applicant is undertaking the reconstruction of the rink pur suant to a land lease agreement
between the Village of Sister Bay and the Frie nds of the Ice Rink. Under that agreement,
reconstruction must be completed within twenty-four months of the lease commencement date
of April 1, 2026, resulting in a required completion date of April 1, 2028. This timeline does not
require Plan Commission direction but provides important context regarding the project’s
schedule and urgency for coordination.
COURTESY REVIEW
Permitted Uses
The two proposed ice rinks fall comfortably within the definition of public recreational facilities,
and both accessory buildings serve functional purposes directly linked to the maintenance and
operation of those rinks. Their size and scale appear appropriate given the facility's nature and
needs.
Setbacks and Dimensional Review
The P‑1 District establishes a 50‑foot front setback from the centerline of any public street and a
40‑foot setback from the edge of pavement or easement for non ‑street frontages. A minimum
50‑foot rear setback also applies. Staff review indicates that the proposed rinks and buildings
remain well within interior portions of the Sp orts Complex and do not approach public street
frontages. Given their location in an establis hed recreational complex, the Commission may
49
Page 3
determine that the internal orientation of the si te justifies flexible side setback treatment,
consistent with the Code’s intent.
Accessory Structures
The resurfacer shed and cooler shed qualify as accessory buildings under Section 66.0501, which
requires such buildings to be located on the same lot as the principal recreational use, to comply
with accessory structure setbacks, and to remain within the height limitations applicable to the
principal structures. Accessory buildings in P‑1 cannot exceed the height of the principal structure
and may not exceed 35 feet in total height. The accessory structure would be required to meet
the maximum height requirements. Their placement does not conflict with any known easements
or utilities, as indicated by the submitted engineering drawings.
Parking
The existing lot has supported rink operations in past years, and the proposed configuration does
not materially increase the intens ity of use relative to past seas ons. Staff recommends that the
Commission consider the conti nued use of the curre nt parking supply and determine whether
any additional spaces or adjustments are warranted.
Site circulation for resurfacing vehicles and ma intenance traffic appears to be adequately
addressed in the site plan, which includes dedicated gated access points and defined equipment
yards.
RECOMMENDED ACTION(S)
Staff finds that the proposed reconstruction of the ice rink and supporting facilities is consistent
with the permitted uses and development standards of the P ‑1 Park District. The proposed
project aligns with the district's recreational purpose, reuses existing rink infrastructure, and
incorporates reasonable accessory structures appropriate for year ‑round facility maintenance.
Staff recommends that the Plan Commission provide the applicant with feedback. These
recommendations will help guide the applicant’s preparation of the final zoning permit submittal.
ATTACHMENT(S)
1. Ice Rink Renderings
50
200.0'
50' SIDE/REAR SETBACK - PRINCIPLE & ACCESORY
200.0'
200.1'
200.0'
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
PARKING LOT
4"SAN
4"SAN
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
NEW SAN MH 03
RIM=624.30
8" INV IN=612.45 (N)
8" INV OUT=612.45 (W)
205'-8" PVC @ 0.41%
NEW SAN MH 04
RIM=627.00
8" INV IN=617.00 (NE)
8" INV OUT=617.00 (S)
324'-8" PVC @ 1.40%
8+00
9+00
10+00
11+00
12+00
13+00
MH MH
8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN
8"SAN
8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN
8"SAN
8"SAN
8"SAN
8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN
8"SAN
8"SAN
8"SAN
8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN
8"SAN
8"SAN
8"SAN
8"SAN
8"SAN
8"SAN
8"SAN
8"SAN
8"SAN
8"SAN
4"SAN 4"SAN 4"SAN
29'-4" PVC @ 2.08%
4"SAN
4"SAN
STM MH
RIM=626.20
INV=625(?)
STM OUTLET
INV=620.64
SHEET NUMBER
DATENO
SURVEY
APPROVED
DESIGNED
DRAWN
PROJ. NO.
REVISION
CHECKED
Plot Date: 05/18/2026 - 2:37pm
Drawing name: C:\Users\switalison\appdata\local\temp\AcPublish_28876\193806896_VOSB_ICE RINK_ENG.dwg
Xrefs:, SHEET BORDER.dwg, VOSB_ICE RINK_COUNTY DATA.dwg, SANITARY_SURV_V200.dwg, 193806896_VOSB_SPORTS COMPLEX SANITARY_PIPE NETWORK, R-100 RINK PLAN, 193806896_VOSB_ICE RINK_COUNTY DATA
THE CONTRACTOR SHALL VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS. DO NOT SCALE THE
DRAWING - ANY ERRORS OR OMISSIONS SHALL BE REPORTED TO STANTEC WITHOUT DELAY.
THE COPYRIGHTS TO ALL DESIGNS AND DRAWINGS ARE THE PROPERTY OF STANTEC. REPRODUCTION
OR USE FOR ANY PURPOSE OTHER THAN THAT AUTHORIZED BY STANTEC IS FORBIDDEN.
312 N. 5th Avenue
Sturgeon Bay, WI 54235
www.stantec.com
DATE OF ISSUANCE
FRIENDS OF SISTER BAY ICE RINK
UPDATED ICE RINKS
193806***
SPORTS COMPLEX AT VILLAGE OF SISTER BAY, DOOR COUNTY, WI 54234
DRAFT
STANTEC
SRW
SRW
SRW
SRW
EXISTING CONDITIONS
EXIST
N
0 20' 40'
51
200.0'
50' SIDE/REAR SETBACK - PRINCIPLE & ACCESORY
200.0'
200.1'
200.0' HOCKEY
85'X200'
HOCKEY
85'X200'
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
PARKING LOT
4"SAN
4"SAN
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
205'-8" PVC @ 0.41%
324'-8" PVC @ 1.40%
8+00
9+00
10+00
11+00
12+00
13+00
MH MH
8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN
8"SAN
8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN
8"SAN
8"SAN
8"SAN
8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN
8"SAN
8"SAN
8"SAN
8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN8"SAN
8"SAN
8"SAN
8"SAN
8"SAN
8"SAN
8"SAN
8"SAN
8"SAN
8"SAN
8"SAN
4"SAN 4"SAN 4"SAN
29'-4" PVC @ 2.08%
4"SAN
4"SAN
STM MH
RIM=626.20
INV=625(?)
STM OUTLET
INV=620.64 50' SIDE/REAR SETBACK - PRINCIPLE & ACCESORY
SHEET NUMBER
DATENO
SURVEY
APPROVED
DESIGNED
DRAWN
PROJ. NO.
REVISION
CHECKED
Plot Date: 05/18/2026 - 2:37pm
Drawing name: C:\Users\switalison\appdata\local\temp\AcPublish_28876\193806896_VOSB_ICE RINK_ENG.dwg
Xrefs:, SHEET BORDER.dwg, VOSB_ICE RINK_COUNTY DATA.dwg, SANITARY_SURV_V200.dwg, 193806896_VOSB_SPORTS COMPLEX SANITARY_PIPE NETWORK, R-100 RINK PLAN, 193806896_VOSB_ICE RINK_COUNTY DATA
THE CONTRACTOR SHALL VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS. DO NOT SCALE THE
DRAWING - ANY ERRORS OR OMISSIONS SHALL BE REPORTED TO STANTEC WITHOUT DELAY.
THE COPYRIGHTS TO ALL DESIGNS AND DRAWINGS ARE THE PROPERTY OF STANTEC. REPRODUCTION
OR USE FOR ANY PURPOSE OTHER THAN THAT AUTHORIZED BY STANTEC IS FORBIDDEN.
312 N. 5th Avenue
Sturgeon Bay, WI 54235
www.stantec.com
DATE OF ISSUANCE
FRIENDS OF SISTER BAY ICE RINK
UPDATED ICE RINKS
193806***
SPORTS COMPLEX AT VILLAGE OF SISTER BAY, DOOR COUNTY, WI 54234
DRAFT
STANTEC
SRW
SRW
SRW
SRW
SITE PLAN
SITE
N
0 20' 40'
52
Page 1
STAFF REPORT
Date: May 26, 2026
To: Plan Commission
Re: Courtesy Review; Adam and Bridgid White; Sister Bay General Store;
10674 North Bay Shore Drive
Author(s): Benjamin Andrews
Action(s) Requested: ☐ Ordinance ☐ Resolution ☒ Motion ☒ Receive/File
BACKGROUND INFORMATION
The applicants, Adam and Brigid White, have submitted conceptual ma terials for a Courtesy
Review of a proposed developm ent of a General Store at 10674 N Bay Shore Drive. Materials
include two site plan options, interior and exterior building pl ans, preliminary elevations, and
parking calculations as part of the courtesy submittal.
The property is located in the B ‑3 Downtown Business District, which encourages
pedestrian‑oriented design, reduced setbacks, mixed ‑use compatibility, and strict adherence to
the Downtown architectural and site design standards.
A courtesy review is non‑binding and is intended to identify zoning issues prior to submission of
a formal zoning permit and Site Plan & Architectural Review under Sec. 66.1050.
53
General Store Courtesy Review Items
• Site Plan Options
o Discuss wetland setback requirements (if any) for this parcel
One option provides more buffer to wetland
Second option saves more trees on the east and a buffer from residential area
Site Plan based upon 2021 Survey
o Can fence line be located right on the property line?
o General Site Setback Review
Based upon typical B3 Zoning setback requirements
• Parking Requirements
o Are parking calculations adequate for building? Calculations shown on Site Plan
Review Sec. 400 (11) (h) section on parking requirements when restaurant is
accessory use to retail
• Plan Commission Zoning Permit Requirements
o Architectural Plan
Is a rendering required? Does a rendering of (1) elevation suffice?
All materials and selected colors required for submission?
o Drainage Plan
Will one be required on this project?
• A little over half an acre is currently being shown as being disturbed
o Building Plans
Noted as including HVAC, plumbing, and electrical plans
What is required here? Any exterior locations for rooftop units, condensers,
generator, and electric meters?
• Exterior Elevation
o Review signage requirements
Max size for construction signage?
Can sign be located below ridge line?
o Decorative pedestal will provide screening for any rooftop units
54
55
PARKING CALCULATIONS:
A.RETAIL SALES & CUSTOMER SERVICE:
1 SPACE PER 300 SQ. FT. OF GROSS FLOOR AREA OF CUSTOMER
SALES AND SERVICE PLUS 1 SPACE PER EMPLOYEE
B.RESTAURANTS:
1 SPACE PER 150 SQ. FT. OF GROSS FLOOR AREA OR 1 PER FOUR
SEATS, WHICHEVER IS GREATER. PLUS 1 SPACE PER EMPLOYEE.
C.BUSINESS:
1 SPACE PER 200 SQ. FT. OF GROSS FLOOR AREA PLUS 1 SPACE PER EMPLOYEE
GROSS FLOOR AREA OF RETAIL SALES & CUSTOMER SERVICE PER FLOOR:
LOWER LEVEL: 0 SQ. FT.
MAIN LEVEL:1,799 SQ. FT.
UPPER LEVEL:2,171 SQ. FT.
TOTAL:3,970 SQ. FT.
3,970/300 = 13.24 = 14 SPACES
4 EMPLOYEES @ MAX. SHIFT = 4 SPACES
GROSS FLOOR AREA OF RESTAURANT PER FLOOR:
LOWER LEVEL: 0 SQ. FT.
MAIN LEVEL:758 SQ. FT.
UPPER LEVEL:437 SQ. FT.
TOTAL:1,195 SQ. FT.
1,195/150 = 7.97 = 8 SPACES
4 EMPLOYEES @ MAX. SHIFT = 4 SPACES
GROSS FLOOR AREA OF BUSINESS PER FLOOR:
LOWER LEVEL: 601 SQ. FT.
MAIN LEVEL:207 SQ . FT.
UPPER LEVEL:0 SQ. FT.
TOTAL:808 SQ. FT.
808/200 = 4.04 = 5 SPACES
2 EMPLOYEES @ MAX. SHIFT = 2 SPACES
TOTAL SPACES = 37
B-3 PARKING CREDIT PER 66.04.03 (10) (b)
-3 SPACES
TOTAL SPACES REQUIRED = 34
(2) ADA PARKING STALLS REQUIRED (1 VAN PARKING STALL)
TOTAL SPACES PROVIDED = 34
(2) ADA PARKING STALLS REQUIRED (1 VAN PARKING STALL)
TRUE NORTH
N 0204060100
PROPERTY LINE
PROPERTY LINE
6'-0"SIDE
SETBACK
20'-0"
FRONT SETBACK
6'-0"
SIDE
SETBACK
6'-0"
SIDE
SETBACK
6'-0"
SIDE
SETBACK
6'-0"
SIDE
SETBACK
6'-0"SIDE
SETBACK
6'-0"
SIDE
SETBACK
40'-0"
REAR SETBACK
6'-0"
SIDE
SETBACK
22'-0"
22'-0"
ADAVAN
ADA
6'-0"
28'-5
1
2"
1
3
4
8
9
14
15
20
21
24
25
30
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
RAMP
(E) UTILITIES
(E) SIDEWALK
(E) TREE
FENCELINE 3'-0"
6'-6"
RETAIL
FP
RECEIVING
TRASH
VESTIBULE
FRONTPORCH
ICE CREAMPARLOR
PLANTER
S. SPRING RD.
NORTH BAY SHORE DRIVE
PROPERTY LINE
PROPERTY LINE
6'-0"SIDE
SETBACK
20'-0"
FRONT SETBACK
6'-0"
SIDE
SETBACK
6'-0"
SIDE
SETBACK
6'-0"
SIDE
SETBACK
6'-0"
SIDE
SETBACK
6'-0"SIDE
SETBACK
6'-0"
SIDE
SETBACK
40'-0"
REAR SETBACK
6'-0"
SIDE
SETBACK
22'-0"
22'-0"
ADAVAN
ADA
9'-81
8"
24'-0
5
8"
1
3
4
11
17
10
18
24
25
30
31
34
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
RAMP
(E) UTILITIES
(E) SIDEWALK
(E) TREE
FENCELINE 3'-0"
6'-6"
RETAIL
FP
RECEIVING
TRASH
VESTIBULE
FRONTPORCH
ICE CREAMPARLOR
FIRE PIT
PLANTER
S. SPRING RD.
NORTH BAY SHORE DRIVE
31
34
22'-0"
WETLAND BOUNDARY
PER 9/3/2021 SURVEY
DELINEATION.
NEW DELINEATION
UNDERWAY.
WETLAND BOUNDARY
PER 9/3/2021 SURVEY
DELINEATION.
NEW DELINEATION
UNDERWAY.
FIRE PIT
SCALE:
2 Site Plan - Option 2
1/16" = 1'-0"
SCALE:
1 Site Plan - Option 1
1/16" = 1'-0"
Sister Bay
10674 North Bay Shore Drive
GSW
General Store
ISSUE:
COURTESY REVIEW 2026.05.05
WADE WEISSMANN ARCHITECTURE, INC. © / P: 414 - 351-1200 F: 414 - 352-8385 2026
Sister Bay, WI 54234
C1.00
ARCHITECTURAL
SITE PLAN
56
UP (21)R @
7" EA.
SITTING
016
WW X HH
DW
6'-3"
8'-4"
LIGHT WELL LIGHT WELL
UP (21)R @
7" EA.
STAIR 2
004
WW X HH
UP (21)R @
7" EA.
LIGHT WELL LIGHT WELL
FP
PREP./STORAGE
015
WW X HH
MECHANICAL/
STORAGE
012
WW X HH
KITCHEN/PREP/
STORAGE
000
WW X HH
WALK-IN
FREEZER
014
WW X HH
WALK-IN
FREEZER
013
WW X HH
LOCKERS
011
WW X HH
OFFICE
009
WW X HH
CORRIDOR
003
WW X HH
WALK-IN
REFRIG.
002
WW X HH
JAN./
STORAGE
007
WW X HH
CONTROL
ROOM
008
WW X HH
UNISEX
005
WW X HH
UNISEX
006
WW X HH
ELEVATOR
WALK-IN
REFRIG.
001
WW X HH
PALLET
ELEVATOR
DW
COMPRESSOR
FREIGHT
EQUIP.
STAIR 1
010
WW X HH
05101525
SCALE:
1Lower Level Plan
1/4" = 1'-0"
TRUE NORTH
N
LOWER LEVEL FLOOR PLAN
SQUARE FOOTAGE ANALYSIS (gross)
4,710 SQ. FT.
MAIN LEVEL FLOOR PLAN4,306 SQ. FT.
UPPER LEVEL FLOOR PLAN2,905 SQ. FT.
MAIN LEVEL DECK942 SQ. FT.
UPPER LEVEL DECK959 SQ. FT.
DECKS
TOTAL11,921 SQ. FT.
TOTAL1, 901 SQ. FT.
A1.00
LOWER LEVEL
FLOOR PLAN
Sister Bay
10674 North Bay Shore Drive
GSW
General Store
ISSUE:
COURTESY REVIEW 2026.05.05
WADE WEISSMANN ARCHITECTURE, INC. © / P: 414 - 351-1200 F: 414 - 352-8385 2026
Sister Bay, WI 54234
57
05101525
SCALE:
1 Main Level Plan
1/4" = 1'-0"
UP (21)R @
7" EA.
SHIPPING/ RECEIVING
101
WW X HH
KITCHEN/STORAGE
100
WW X HH DN (3)R @
51
2" EA.
36" HIGH
POINT OF PURCHASE
NON-REFRIG/CANDY DISPLAY
POINT OF
PURCHASE
109
WW X HH
HARP GALLERY
LIGHTED BACK BAR
FRONT
PORCH
108
WW X HH
SIDE
PORCH
111
WW X HH
TRASH
ENCLOSURE
FOOD
COUNTER
110
WW X HH
FULL HEIGHT
COOLER
DF
RETAIL
107
WW X HH
RAMP
RAMP
RAMP
STAIR 1
106
WW X HH
MEN
104
WW X HH
WOMEN
103
WW X HH
STORAGE
105
WW X HH
BOOKS BOOKS
DN (3)R @
51
2" EA.
STAIR 2
102
WW X HH
PALLET
ELEVATOR
OVENS,
SHAFT FOR
FUTURE
OVENS BELOW
ICE CREAM
PARLOR
112
WW X HH
DN (21)R @
7" EA.
ADA
UP (21)R @
7" EA.
DN. (21)R @
7" EA. UP (21)R @
7" EA.
DN. (21)R @
7" EA.
LIGHT WELL
BELOW
LIGHT WELL
BELOW
LIGHT WELL
BELOW
LIGHT WELL
BELOW
TRUE NORTH
N
LOWER LEVEL FLOOR PLAN
SQUARE FOOTAGE ANALYSIS (gross)
4,710 SQ. FT.
MAIN LEVEL FLOOR PLAN4,306 SQ. FT.
UPPER LEVEL FLOOR PLAN2,905 SQ. FT.
MAIN LEVEL DECK942 SQ. FT.
UPPER LEVEL DECK959 SQ. FT.
DECKS
TOTAL11,921 SQ. FT.
TOTAL1, 901 SQ. FT.
A1.01
MAIN LEVEL FLOOR
PLAN Sister Bay
10674 North Bay Shore Drive
GSW
General Store
ISSUE:
COURTESY REVIEW 2026.05.05
WADE WEISSMANN ARCHITECTURE, INC. © / P: 414 - 351-1200 F: 414 - 352-8385 2026
Sister Bay, WI 54234
58
RETAIL
200
WW X HH
DN (21)R @
7" EA.
RETAIL
206
WW X HH
BENCH BENCH
LANDING
DECK 1
207
WW X HH
DF
STORAGE
JANITOR
204
WW X HH
OPEN TO BELOW
ELEVATOR
ROOF
BELOW
UNISEX
202
WW X HH
UNISEX
203
WW X HH
FP
STAIR 2
201
WW X HH
STAIR 1
205
WW X HH
GAS
FP
DN. (21)R @
7" EA.
DN. (21)R @
7" EA.
DW
DECK 2
208
WW X HH
05101525
SCALE:
1 Upper Level Plan
1/4" = 1'-0"
TRUE NORTH
N
LOWER LEVEL FLOOR PLAN
SQUARE FOOTAGE ANALYSIS (gross)
4,710 SQ. FT.
MAIN LEVEL FLOOR PLAN4,306 SQ. FT.
UPPER LEVEL FLOOR PLAN2,905 SQ. FT.
MAIN LEVEL DECK942 SQ. FT.
UPPER LEVEL DECK959 SQ. FT.
DECKS
TOTAL11,921 SQ. FT.
TOTAL1, 901 SQ. FT.
A1.02
UPPER LEVEL
FLOOR PLAN
Sister Bay
10674 North Bay Shore Drive
GSW
General Store
ISSUE:
COURTESY REVIEW 2026.05.05
WADE WEISSMANN ARCHITECTURE, INC. © / P: 414 - 351-1200 F: 414 - 352-8385 2026
Sister Bay, WI 54234
59
Building Width with Chimney: 103'-3" (Rounded to 105ft to determine multiplier)
Allowable Signage Multiplier: 0.646
ALLOWABLE SIGNAGE IN SQ. FT = 66.70 SQ.FT
APPROXIMATE PROPOSED SIGNAGE:
General Store Sign = 16'-10" x 2'-6" = 41.30 sq.ft
Ice Cream Store Sign (3'-6" x 1'-6")+(16'-0"x1'-2")= 23.92 sq.ft
TOTAL PROPOSED SIGNAGE = 65.22 SQ.FT.
T.O. PL. HT.
121'-4"
T.O. PL. HT.
110'- 0 3/4"
T.O. PARAPET
126'-10 3/4"
T.O. SUBFLR.
100'-0"
T.O. RIDGE SHEATHING
132'-3 1/4"
T.O. EAVE
122'-6 1/4"
T.O. SUBFLR.
100'-0"
T.O. PL. HT.
110'-0 3/4"
T.O. SUBFLR.
112'-3"
T.O. PL. HT.
121'-4"
T.O. EAVE
122'-6 1/4"
T.O. PARAPET
126'-10 3/4"
T.O. RIDGE SHEATHING
132'-3 1/4"
T.O. CUPOLA
139'-5 3/4"
T.O. CUPOLA
139'-5 3/4"
10'-03
4" 2'-21
4" 9'-1" 1'-21
4" 4'-41
2" 6'-41
2" 7'-21
2"1'-71
2"
GRADE
98'-4 1/2"
GRADE
98'-4 1/2"
34'-107
8"
MAX ROOF HT.
133'-4 1/2"
MAX ROOF HT.
133'-4 1/2"
T.O. SUBFLR.
112'-3"
60
Source: Village of Sister Bay website. First collected Oct 10, 2026.