MARINA COMMITTEE MEETING AGENDA
Wednesday, May 20th at 4:00PM
Sister Bay Liberty Grove Fire Station – 2258 Mill Road, Large Meeting Room
To access the meeting electronically via Zoom, click the link below:
https://zoom.us/j/3597569647?pwd=671UiiJPSuJM9QHfABHmzGC12vlhJa.1&omn=99413666077
Meeting ID: 359 756 9647
Password: 8544457
To connect by telephone, please dial
1-305-224-1968 - Meeting ID 359 756 9647#
Deviations from the agenda order shown may occur.
1 Brigid White – Trustee & Chairperson 2 Steve Bacsi - Trustee
3 Patrice Champeau – Trustee 4 Pat Duffy - Resident
5 Kevin Grant – Citizen Marina Manager – David Lienau
Benjamin Andrews – Village Administrator Asst. Marina Manager- Sam Jordan
AGENDA
1. Call to Order
2. Roll Call
3. Approval of Agenda
4. Approval of Minutes – April 8th, 2026
5. Comments and Correspondence
6. Discussion/Action Items
a. New Building – Fittings & Finishes
b. Boardwalk Update
c. Marina Opening
d. Review of Financials
7. Matters to be Placed on a Future Agenda or Referred to a Committee, Official, or Employee
8. Adjournment
Public Notice
Questions regarding the nature of the agenda items or more detail on the agenda items listed above can be directed to Village Administrator, Benjamin
Andrews. Email administrator@sisterbaywi.gov. It is possible that members of, and possibly a quorum of members, of other governmental bodies of the
municipality may attend the meeting to gather information; no action will be taken by any governmental body other than the governmental body
specifically referred to in this notice. Upon reasonable notice, a good faith effort will be made to accommodate the needs of disabled individuals through
sign language interpreters or other auxiliary aids at no cost to the individual to participate in public meetings. Due to the difficulty in finding interpreters,
requests should be made as far in advance as possible, preferably a minimum of 48 hours. For additional information or to request this service, contact the
Sister Bay Village Administration Office at 854-4118, (FAX) 854-9637, or by writing to the Village Administration Building, 2383 Maple Drive, PO Box 769,
Sister Bay, WI 54234. Copies of reports and other supporting documentation are available for review at the Administration Building, 2383 Maple Drive
during operating hours. (8 a.m. – 4 p.m. Monday – Thursday, 8 a.m. to 12:00 p.m. on Friday).
The Village of Sister Bay is an Equal Opportunity Provider.
1
MARINA COMMITTEE MEETING MINUTES 1
Wednesday, April 8th, 2026 2
(Approval Pending) 3
4
Agenda Item No. 1. The April 8th, 2026 meeting of the Marina Committee was called to order 5
by White at 4:00 P.M. 6
7
Agenda Item No. 2. Roll Call 8
9
Present: Brigid White, Kevin Grant, Pat Duffy 10
11
Absent: Patrice Champeau 12
13
Staff: Marina Manager - Dave Lienau, Assistant Manager - Sam Jordan, Village Administrator 14
– Benjamin Andrews 15
16
Others: Steve Bacsi, Marley Inksetter, Skip Heidler 17
18
Agenda Item No. 3. Approval of the Agenda 19
20
A motion was made by Duffy, seconded by Grant that the Agenda for the April 8th, 2026 meeting of the 21
Marina Committee be approved as presented. Motion carried – All ayes. 22
23
Agenda item No. 4. Approval of the Minutes 24
25
A motion was made by Grant, seconded by Duffy that the minutes of the March 11th, 2026 Meeting of the 26
Marina Committee be approved by the committee. Motion carried – All ayes. 27
28
Agenda Item No. 5. Comments, correspondence, and concerns from the public 29
30
No correspondence was received for this meeting. White asked if anyone would like to make a 31
public comment, and no one responded. 32
33
Agenda Item No. 6. Discussion/Action Items 34
35
a.) New Building Design 36
37
Lienau, White & Andrews summarized progress on the new building design so far and the next 38
steps towards getting construction documents ready for going out to bid. The committee shared 39
input on the current design before recommending it to the Plan Commission for approval. 40
41
A motion was made by Duffy, seconded by Grant to send the new building designs to the Plan 42
Commission as presented in the packet. Motion carried – All ayes. 43
44
b.) Boardwalk Update 45
46
Lienau updated the committee on status of the boardwalk reconstruction project, noting that the 47
resurfacing is about a third of the way complete. 48
2
c.) Spring Opening 1
2
Lienau noted that the marina opens May 13th, adding that due to the marina still being iced in, 3
the launch ramp will not be available for April fishing tournaments. Lienau furthered that due 4
to the ice being in the harbor so late into Spring, reassembly of the marina will probably happen 5
closer to the opening date than the marina would prefer. However, Lienau expects the marina 6
to open on time. 7
8
d.) Cancellation Policy Discussion 9
10
Lienau summarized unique circumstances that challenge the marina’s current cancellation 11
policy. The committee discussed various options that marina could consider using in the 12
coming season. 13
14
e.) Review of Financials 15
16
Lienau noted that the marina’s YTD actual revenue is approximately $690,000 dollars with 17
commercial slip revenue and additional transient revenue still to come. 18
19
Agenda Item No.7. Matters to be placed on a future agenda or referred to a committee, 20
official, or employee 21
22
It was the consensus of the committee that that following items be included on a future committee 23
meeting agenda: 24
- New Building Plans to Village Plan Commission 25
26
Next marina committee meeting is tentatively scheduled for Wednesday May 20th, 2026, at 4:00PM in-27
person at the Sister Bay Fire Station. 28
29
Adjournment: A motion was made by Grant, seconded by Duffy to adjourn the April 8th, 2026 meeting 30
of the Marina Committee at 4:53P.M. Motion carried – All ayes. 31
32
Respectfully submitted, 33
34
Samuel Jordan 35
Assistant Marina Manager 36
3
RevIDIssued ForDate
01 - WIPIssue for ReviewWork in
Progress
AG01
4629 N Broadway
Chicago, IL 60640
773.561.1987
www.mdtarch.com
Printed: 5/1/26
New Marina Building
Cover Sheet and General
Notes
Sister Bay Marina
10733 Bay Shore Drive,
Sister Bay, Wisconsin
Sheet Index
Architectural
AG01
AG02
AA01
AK01
AG03
AG04
AD01
AK01
A101
A102
A103
A10x
A104
A105
A701
A201
A202
A203
A204
A205
A401
A402
A403
A404
A601
A602
A603
A604
A605
A606
A607
Cover Sheet and General Notes
Code Matrix and Parking Map
Accessibility Diagrams
Life Safety Plan
Existing Site Plan
Proposed Site Plan
Demolition Plan
Egress Plan
First Floor Plan
Second Story Plan
Roof Plan
Foundation Plan
First Floor Reflected Ceiling Plan
Second Floor Reflected Ceiling Plan
Millwork
Building Elevations
Building Elevations
Building Sections
Building Sections II
Enlarged Stair Sections
Wall Ceiling & Floor Types
Window Schedule
Finish Schedule
Finish Plan
Interior Elevations
Interior Elevations
Interior Elevations
Interior Elevations
Interior Elevations
Interior Elevations
Interior Elevations
N
N
Area of Work: 3655 SF
Vicinity Plan
not to scale
New Marina Building
Sister Bay Marina
10733 Bay Shore Drive
Sister Bay, Wisconsin
Zoning Map
not to scale
Property Information
Site Address: 10733 Bay Shore Drive Sister Bay Wisconsin 54234
Zoning: (P-1) Park/Recreation
Project Type: Accessory building to beach/ marina
Construction: V B (Non-sprinklered)
Description: Scope of work to include complete demo of existing
boat house and construction of new 2 story boathouse
in the same location.
Project Site
General Notes
1 The work of this Project shall be governed by the provisions of the
Standard Form of Agreement Between Owner and Contractor AIA
A101, current edition), AIA General Conditions (AIA A201 current
edition as amended) and the Project manual for the Project unless
otherwise noted. Where a conflict exists between these drawings and
the Project Manual the Project Manual shall be the rule.
2 The drawings indicate the general scope of the project in terms of design
concept, dimensions, major elements and materials. These drawings do
not necessarily indicate or describe all work required for the full
completion of the project.
3 All work shall be performed or supervised by a General Contractor
(GC), or by a Subcontractor (SC) certified, insured and licensed to
perform work in the trades involved in this project in and by the Village of
Sister Bay. The General Contractor and Subcontractors (SC’s) shall
furnish all material, equipment and labor required for full completion of
the project.
4 Do not scale drawings. Written dimensions are to be used wherever
possible. The GC shall be responsible for the field verification of all
dimensions and conditions before the execution of any work and shall
report any discrepancies to MDT for inspection before proceeding.
Interior measured layouts shall be checked with dimensions on the
drawings. Any discrepancies shall be brought to the attention of MDT
and resolved prior to proceeding with the work.
5 The GC shall coordinate the work of all the SC’s and suppliers and their
respective work as it relates to the others. The GC shall coordinate all
dimensions, quantities and conditions before proceeding with any
equipment or materials or proceeding with the work.
6 The GC shall coordinate the exact location of light fixtures with the
structural members and work of other trades so that structural members
do not interfere with light fixture locations.
7 The GC and SC’s shall completely hook-up, connect and install all
equipment specified herein or supplied by the Owner.
8 The GC shall provide design build of fire suppression and fire alarm
system as part of deferred submittals to the local authorities having
jurisdiction.
9 The GC shall coordinate utilities: water, gas, and electrical startup.
10 The premises shall be kept broom clean during all phases of construction.
Rubbish and debris shall be removed from the site immediately but at
least once per week, and shall be disposed of in a legal manner. Final
cleaning to be performed by all trades. It is the responsibility of the GC
to coordinate the cleaning. Final cleaning includes but is not limited to
the following: exterior site areas, floors cleaned and waxed where
applicable, glass and mirrors, all wall surfaces, plumbing fixtures
(including exposed piping, remove all labels), mechanical equipment,
lighting fixtures and devices.
11 All exit doors shall be readily openable from the egress side without
the use of a key or special knowledge or effort. 2009 IBC
12 All interior and exterior finishes shall be no less flame resistant than
required by the 2009 IBC
Roof Coverings
Walls and Ceilings
Floor coverings
13 Safety glazing materials shall be used wherever required by code.
2009 IBC
14 Handrails and guards shall be used wherever required by code and shall
comply with dimensional and structural requirements.
15 The guard and handrail shall be designed to resist a simultaneous
vertical and horizontal thrust of 50lb/ft (pounds-force per linear foot)
applied at the top of the railing or a concentrated load of 200lbs/ft in any
direction, whichever produces the greatest stress.
16 No hazardous materials are to be stored or used on site. This includes
flammable or corrosive liquids.
Certification Statements
Architectural
I hereby certify that these drawings were prepared
under my supervision and that to the best of my
knowledge they conform to the Codes and Ordinances
of the Village of Sister Bay, Wisconsin.
James Patrick Thompson
Manske Dieckmann Thompson
Architect
Mechanical, Eletrical, & Plumbing
I hereby vertify that these drawings were prepared under my
supervision and that to the best of my knowledge they
conform to the Codes and Ordinances of the Village of Sister
Bay, Wisconsin.
Name
Company
Role
Structural
I hereby certify that these drawings were prepared under my
supervision and that to the best of my knowledge they
conform to the Codes and Ordinances of the Village of Sister
Bay, Wisconsin
Name
Company
Role
Energy Code Compliance
I hereby certify that I am a Registered Energy Professional.
I also certify that to the best of my knowledge and belief the
attached drawings fully comply with the requirements of
Chapter 18-13, Energy Conservation, of the Municipal Code
of the Village of Sister Bay, Wisconsin.
James Patrick Thompson
Manske Dieckmann Thompson
Architect Class C — Table 1505.1
Class A — exit paths —Table 803.13
Class B — corridors
Class C — rooms
Class II — 804.4.1
Referenced Codes
Wisconsin Admin Codes SPS 361-366
Wisconsin Municipal Codes
Buildings and Regulations- Chapter 14
Fire Prevention- Chapter 22
Zoning Code- Chapter 66
International Building Code 2015 edition
Wisconsin Accessibility Code 2009 edition
International Mechanical Code 2015 edition
International Fire Prevention Code (IFC) 2015 edition
International Fuel Gas Code 2015 edition
ICC International Energy Conservation Code 2021 edition
ICC International Property Maintenance Code 2015 edition
Wisconsin Plumbing Code 2018 edition
International Building Code 2021 Edition
Wisconsin Commercial Building Code 2021 Edition
International Energy Conservation Code 2021 Edition
Project Site
4
RevIDIssued ForDate
01 - WIPIssue for ReviewWork in
Progress
AG02
4629 N Broadway
Chicago, IL 60640
773.561.1987
www.mdtarch.com
Printed: 5/1/26
New Marina Building
Code Matrix and Parking Map
Sister Bay Marina
10733 Bay Shore Drive,
Sister Bay, Wisconsin
GENERAL BUILDING REQUIREMENTS Per NEW Sister Bay Zoning Ordinance and Wisconsin Building Code
ITEM ISSUE CHAPTER/ARTICLE Ordinance Requirement Actual
ZONING REQUIREMENTS
BUILDING REQUIREMENTS
EXITING REQUIREMENTS
1.01 Zoning District SBZO Chapter 66 P-1 P-1
1.02 Permitted Uses Sec. 66.0331 (1) Public parks, beaches, botanical gardens, aboretums Accessory buiding to
beach/ marina1.03 Permitted Accessory Uses Sec. 66.0331 (2) Buildings accessory to permitted use, any other usual and customary uses accessory to permitted uses
1.04 Total Building and Hardscape Area Sec. 66.0331 (4b) The total of the floor area of all floors, including required parking, driveways, and sidewalks shall not
exceed 25% of lot area, which shall be left as green space Complies
1.05 Building Height Sec. 66.0331 (4a) No part of a building shall exceed 35 feet in height Complies
1.06 Minimum Yards Front Sec. 66.0331 (5a/b) 50 ft minimum from centerline of right-of-way streets, 40 ft minimum from edge of easement/ pavement
for all buildings not on a public street Complies
1.07 Side Sec. 66.0331 (5c) 50 ft minimum Complies
1.08 Rear Sec. 66.0331 (5c) 50 ft minimum Complies
1.09 Off Street Loading Sec. 66.0402 (1) Complies
1.10 Off Street Parking Sec. 66.0403 (13d) Parking requirements for marina: one (1) space per 5 boat berths, plus 15 spaces per boat launching
ramp, plus one (1) space per 500 sq ft of dry boat storage area Complies
1.11 Parking Lot Screening Sec. 66.0403 (8)
Parking areas for 4 or more vehicles, if adjoining a residential zoning district or public right-of-way, shall
be screened from casual view by an earth berm, stonewall, fence, evergreen planting of equal density,
or other method approved by the Plan Commission. The parking screening needs to be an average of 3
feet in height between parking and right-of-way, and 6 feet in height between the parking and any
adjacent residential property line. The Plan Commission may require greater screening requirements for
parking of large trucks, trailers, and large equipment
Complies
2.01 Occupancy Classification (s) 304.1 B, Business B, Business
2.02 Types of Construction Chapt. 6 III-B (Non-Sprinklered) III-B (Non-Sprinklered)
2.03
Height and Area Limitations Chapt. 5
Height 504.3 55-ft 30-ft, Complies
Stories 504.4 3 2, Complies
Area 506.2 19,000 SF Max 3,022 SF, Complies
2.04
Primary Structural Frame Ch. 6 Table 601 0HR 0HR, Complies
Exterior Bearing Walls Ch. 6 Table 601 2HR 2HR, Complies
Exterior Non-Bearing Walls Ch. 6 Table 602 0HR required if ≥ 30 ft of fire separation,1HR required if ≤ 30 ft of fire separation 1HR, Complies
Interior Bearing Walls Ch. 6 Table 601 0HR 0HR, Complies
Interior Nonbearing Walls Ch. 6 Table 601 0HR 0HR, Complies
Columns Supporting Roofs Only Ch. 6 Table 601 0HR 0HR, Complies
Beams Supporting Roofs Only Ch. 6 Table 601 0HR 0HR, Complies
Floor Construction Ch. 6 Table 601 0HR 0HR, Complies
Roof Construction Ch. 6 Table 601 0HR 0HR, Complies
2.05
Fire - Resistive Requirements Chapt. 7
a)Exterior Wall Openings 705.8
Not permitted with less than 5 ft of fire separation distance,
openings totaling 10% of exterior wall per story are permitted with 5-10 of fire separation distance,
openings totaling 15% of exterior wall per story are permitted with 10-15 ft, of fire separation distance,
openings totaling 25% of exterior wall per story are permitted with 15-20 ft of fire separation distance,
openings totaling 45% of exterior wall per story are permitted with 20-25 ft of fire separating distance,
openings totaling 70% of exterior wall per story are permitted with 25-30 ft of fire separation distance,
no limit on openings with 30+ ft of fire separation distance
Complies
b)Fire Walls - Construction 706.40 Fire walls shall have a fire-resistance rating of not less than 3 hours 3HR, Complies
c)Horizontal Continuity 706.50 Fire walls shall be continuous from exterior wall to exterior wall and extend at least 18 inches beyond
the surface of exterior walls Complies
d)Exterior Walls 706.5.1
Where the fire wall intersects exterior walls, the fire-resistance rating and opening protection of the
exterior walls shall have a 1-hour fire-resistance rating with 3/4 hour protection where opening protection
is required by section 705.8
Complies
e)Horizontal Projecting Elements 706.5.2
Fire walls shall extend to the outer edge of horizontal projecting elements such as balconies or roof
overhangs that are within 4 ft of the fire wall, HOWEVER, 2 hour fire-resistance walls are permitted to
terminate at the underside of the roof sheathing, deck, or slab
Complies
f)Vertical Continuity 706.6 Fire walls to extend from foundation to termination point at least 30 inches above adjancent roofs Complies
g)Fire Barriers/ Fire Walls Table 707.3.10 2HR 2HR, Complies
h)Fire-partitions 708.30 Fire partitions shall have a fire-resistance rating of not less than 1 hour Complies
i)Stairway Enclosures 1023.2 1 HR if less than 4 stories Complies
j)Elevator & Escalator Enclosures 1023.2 1 HR if less than 4 stories Complies
k)Interior Wall and Clg.Finishes Table 803.11
exit paths A A
corridors B B
rooms C C
2.06
Classification of Doors & Shutters Table 716.5 doors 1 HR wall requires 1 HR door 2 HR wall requires 1.5 HR door Complies
100 sq in max vision panel, 1 hr/W-60 sidelight 100 sq in max vision panel, 2 hr/W-120 sidelight
3.01 Types of Exits Chapt. 10
3.02 Minimum Number of Exits Table 1006.3.2(2) 1 required if maximum occupant load on second story is 29 and maximum common path of egress travel
distance is 75 feet 1
3.03 Travel Distance to Exits 1017.20 200 ft maximum if not sprinklered 41'-3" maximum
3.04 Capacity of Exits 1005.3.1 stair .3"/occupant Complies
1005.3.2 door .2"/occpant Complies
3.05 Minimum Width of Exits 1010.1.1 32" minimum clear opening Complies
3.06 Swing of Exit Doors 1010.1.2.1 swing in direction of egress where occupancy >50 Complies
3.07 Hardware 1010.1.9.2 mount between 34 and 48" a.f.f. Complies
3.09 Landings 1011.60 min. depth 48 and width equal or greater than stair Complies
3.10 Handrails 1014.20 mounted 34-38" from finished surface of ramp or stair nosing Complies
1014.3.1 1.25 to 2" round diameter for graspability Complies
3.11 Construction Chapt. 10
3.12 Head Room 1003.20 7'-6" minumum Complies
If under 5,000 sf, 1 loading space is required
EXITING CAPACITY
EXIT EXIT ZONE DESCRIPTION CAPACITY
FACTOR
ZONE
DISTRIBUTION
OCCUPANT
LOAD
REQUIRED
UNITS (in)
ACTUAL
UNITS (in)
A
B
C
D
TOTAL 39 7.8 216
Lobby Main Entrance
.2"/occupant see occupancy
table
15 3 72
Staff Room Side Entrance 8 1.6 36
Corridor Side Entrance 9 1.8 36
Optional Workroom Side Entrance 7 1.4 72
FIXTURE COUNTS (Table 2902.1)
CLASSIFICATION FIXTURE CODE REQUIREMENT OCCUPANCY REQ. ACTUAL
Business (B)
WC 1 per 25 for the first 50, the 1 for each additional 50
39
2 7
LAV 1 per 40 for the first 80 1 7
Drinking
Fountains 1 per 100 1 0
Service Sinks 1 service sink total - 1/floor 1/floor
OCCUPANCY CALCULATION (1004.1.1) (Table 1004.5- Maximum floor area per occupant)
Occupancy I: Office
ZONE # ZONE NAME USE CLASSIFICATION AREA SF SF/PERSON OCCUPANCY EXIT
101 Lobby Business areas, concentrated 251 50 6 A
102 Staff Room 1 Business areas, concentrated 207 50 5 B
103 Manager Office Business areas, concentrated 111 50 3 B
104 Staff Room 2 Business areas, concentrated 177 50 4 D
105 Optional Workroom Business areas, concentrated 111 50 3 D
201 Boaters Lounge Business areas, concentrated 757 50 16 A/C
202 Conference Business areas, concentrated 170 300 1 A/C
203 HVAC/ Storage Accessory storage areas, mechanical equipment room 144 300 1 A/C
39
Parking Map
not to scale Project Site Project Site
Parking Requirements and Calculations:
-Requirements are 1 space per 5 boat berths
-plus 15 spaces per boat launching ramp.
—-20% of the spaces required for the boat launching ramps shall be at least 9 ft by 35 ft to accommodate cars with boat trailers.
-35 berths= 7 spaces
-2 launching ramps= 30 spaces, 6 of them being 9 ft by 35 ft
-37 spaces total, 6 being the larger spaces
-On site- the 6 larger spaces are provided
-Off-site- 66 provided, a lot are larger as well
5
RevIDIssued ForDate
01 - WIPIssue for ReviewWork in
Progress
AA01
4629 N Broadway
Chicago, IL 60640
773.561.1987
www.mdtarch.com
Printed: 5/1/26
New Marina Building
Accessibility Diagrams
Sister Bay Marina
10733 Bay Shore Drive,
Sister Bay, Wisconsin
Maneuvering Clearances at Doors
Forward Reach
Knee and Toe Clearance
Turning Space and Ground Space
Signage
Water Closets and Toilet Compartments
Protruding Objects
PTD
TPD
front lip of WC
CL
CL
CL
CL
3'-6"
3'-4" lever
eye viewer typ. 5'-0"
3'-4"
3'-10"
1'-3"
1'-0" min at
demising wall
3'-4"
1'-1" 5/8"
1'-63/4"
2'-10"
2'-3"
1'-31/4"
2'-3"
1'-61/2"
3'-4"
2'-10"
8"
1'-9"
3'-0"
3'-4" 1'-6"
3'-6"1'-0"
3'-4"
1'-6"
2'-0" 1'-0"
3'-0"
1'-5"
1'-6"
2'-11" 3" 1'-6"
6'-61/8"
3'-0" min
1'-3" min
2'-5" min
2'-10"
2'-3" min
8"
11"
9"
5" 2'-10"
8"
1'-9"
3'-4"
2'-8"
4'-0"
4" 4'-0"
2'-3" 6"
9"
min.
60"
Interior Mounting Heights
above counter device
(u.n.o.)
light
switch
thermostat as
located on plan
intercom as
located on plan Bi-level barrier-free
fountain
1 1/4"ø cane
detectable
barrier rail
Hi-Lo Drinking Fountain
lavatory
wall or counter
mounted
insulate exposed
piping
TPD
GB-H
GB-V
GB-H
Typical Accessible Toilet Dimensions
flush always
on the
open side
shower control and
hand shower
textured grab bar
shower curtain rod
folding seat
Typical Accessible Shower Dimensions
mirror
textured grab bar
Toilet Accessory Key
PTD paper towel dispenser surface mounted
AHD accelerator hand dryer surface mounted
TPD toilet paper dispenser semi-recessed
SND sanitary napkin disposal recessed
BCS baby changing station surface mounted
USMB utility shelf w/ mop/broom surface
RR rub rail
CG corner guard
3'-6"
3'-6"
4'-6"
top of tray
AHD
BCS
SND
USMB
RR
CG
Toilet Accessory Mounting Heights Signage Mounting
6
RevIDIssued ForDate
01 - WIPIssue for ReviewWork in
Progress
AG04
4629 N Broadway
Chicago, IL 60640
773.561.1987
www.mdtarch.com
Printed: 5/1/26
New Marina Building
Proposed Site Plan
Sister Bay Marina
10733 Bay Shore Drive,
Sister Bay, Wisconsin
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
12'-5"
33'-11"
5'-8"
6'-8"
9'-0"
20'-0"
47'-11"
88'-6"
CONCRETE
CONCRETE
CONCRETE
ASPHALT TO
REMAIN
CONCRETE
CONCRETE
DOCK
DOCK
New Trash
Enclosure
Golf Cart
Parking New Bicycle
Parking
(10 Spaces)
1 2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Existing Spaces to Remain
Existing Spaces to Remain
Existing Spaces to Remain
Existing
Sidewalk
Existing
Transformer
18 Parking Spaces to
Remain. Additional spaces
in remote lot, see AG01
Existing Shed to
Remain
New ICE
MACHINE
All Trees outside of new project area to be preserved.
New Sidewalk
New 2 Story Marina Building - Type V-B
(3655 sqft)
New 1 Story Public
Restrooms
(350 sqft)
Existing Boat Launch Location
ROUTE 42
Existing Footprint in orange
N
SCALE: 3/32" = 1'-0"
1 Site Plan
AG04
7
RevIDIssued ForDate
01 - WIPIssue for ReviewWork in
Progress
AD01
4629 N Broadway
Chicago, IL 60640
773.561.1987
www.mdtarch.com
Printed: 5/1/26
New Marina Building
Demolition Plan
Sister Bay Marina
10733 Bay Shore Drive,
Sister Bay, Wisconsin
Selective Demolition Notes
A. Owner and Architect assume no responsibility for the actual condition of the structures to be demolished. Details of existing
construction where shown are furnished for convenience only. Contractor assumes responsibility for preparation to receive new work.
B. Structural members are not to be disturbed, except where specifically shown and detailed. The Contractor shall be responsible for any
damage to the existing structure. Do not impose excessive loads onto existing construction.
C. Execute cutting and demolition by methods which will prevent damage to other work. Do not make openings larger than necessary to
accept new work.Terminate cutting and demolition at existing construction to remain, leaving clean and straight break lines.
D. All materials and labor required for shoring shall be provided by this contractor. Prior to any demolition work the contractor shall
ascertain the framing system, determine support walls, and plan a sequence of demolition that will assure portions of the building
remain intact and in place.
E. Prior to any demolition work this contractor shall provide the necessary temporary support, shoring, and bracing for walls, floors, roofs,
and parts to remain. This shoring shall be installed in such a manner as to adequately support and brace the building and its parts
throughout the construction period until such time as the new work shall provide its support.
F. Remove debris, rubbish and all other materials resulting from the demolition from the site. All demolished and wrecked materials not
to be salvaged and remain the property of the Owner shall become the property of this contractor who shall remove it from the job site.
Removal and disposal of material shall be in a place and in a manner prescribed by local, state and federal (including the EPA)
authorities having jurisdiction.
G. All Dimensions to existing construction shall be field verified.
Report any discrepancies to the Architect.
Dimensions are typically to finished surface of wall.
N
SCALE: 1/4" = 1'-0"
3 Demolition Floor Plan
AD01
8
RevIDIssued ForDate
AK01
4629 N Broadway
Chicago, IL 60640
773.561.1987
www.mdtarch.com
Printed: 5/1/26
New Marina Building
Egress Plan
Sister Bay Marina
10733 Bay Shore Drive,
Sister Bay, Wisconsin
RDW
82'-1" to
bottom of
stair
WC 3
206
52 sq ft
HVAC/Storage
207
184 sq ft
Conference
201
219 sq ft
WC 2
205
52 sq ftBoater's Lounge
202
683 sq ft
Corridor
204
76 sq ft
Stair
200
189 sq ft
Panoramic Room
203
291 sq ft
IT
208
12 sq ft
R
UP
11'-11" to exit
(94'-0" total distance)
A
C D E F G
B
H
52'-1"
to exit
38'-10"
to exit
45'-10"
to exit
17'-5"
to exit
6'-9"
to exit18'-6"
to exit
18'-6"
to exit
WC 1
111
61 sq ft
Elevator
102
39 sq ft
Staff Room
105
221 sq ft
Manager
104
112 sq ft
Staff Workstation
103
277 sq ft
Lobby
101
251 sq ft
Women's - Private
112
233 sq ft
Men's - Private
113
232 sq ft
Corridor
107
185 sq ft
Workroom
106
134 sq ft
Unisex
116
49 sq ft
Womens - Public
117
140 sq ft
Mens - Public
115
139 sq ft
Enclosed Utilities
114
203 sq ft
JC
109
11 sq ft
Life Safety Plan Notes
1. All fire extinguishers to be provided in accordance
with NFPA 10.
2. All required exits and fire protection devices to be
properly maintained at all times during alterations.
3. No electrically or electromagnetically locked doors are
permitted in paths of egress.
4. Door locking devices shall be readily opened in the
direction of egress without the use of a key, special
knowledge, or effort.
Exit Path
ID
Door ID
#ft to Exit
Fire Extinguisher
Life Safety Plan Key
Corresponding to Egress and
Occupancy Tables on AG02
1 HR Elevator enclosure
Recessed per D1 below
Preserve rating and firestop any
penetrations
SCALE: 3/16" = 1'-0"
1 Second Floor
AK01
SCALE: 3/16" = 1'-0"
2 First Floor
AK01
9
RevIDIssued ForDate
A101
4629 N Broadway
Chicago, IL 60640
773.561.1987
www.mdtarch.com
Printed: 5/1/26
New Marina Building
First Floor Plan
Sister Bay Marina
10733 Bay Shore Drive,
Sister Bay, Wisconsin
R
W03
W21
W21
D08
W02 W02 W02 W01
W01
D01
W03 W04 W04
W20
D20
W10
W22
D11
D13
D10
D17
D19
D09
D07
D04 D05
D06
D03
D09a
W04 W04
4
1
2
3 A602
3
2
1
4 A601
A602
3
2
1
4 A604
3
4
1
2 A603
2
1
3
4 A606
3
1
2
A605
46'-61/4"
9'-11/2"
16'-41/2"
14'-31/2"14'-31/2"14'-2"
25'-21/4"
10'-61/4"10'-6"
8'-3"
13'-1/2"
41'-4"
4'-31/2" 4'-11/2" 6'-31/4"
7'-111/4"
5'-1/4" 5'-0"3'-0"3'-0"
16'-5"
6'-6" 6'-111/4"7'-0"
3'-21/4" 5'-0"
13'-0"
8'-4"
87'-11/2"
9'-0" 9'-81/4"
16'-101/2"
25'-2"
8'-9"
11'-1/4" 4'-3"
3'-6"
12"
min
36" min clear
36" min
clear
1'-13/4" 3'-0" 2'-113/4" 7'-63/4" 8'-61/4" 8'-61/4" 14'-91/2"
2'-41/2" 3'-111/4" 4'-5" 9'-111/2" 4'-53/4"
4'-101/4" 12'-0"
14'-0" 15'-5" 15'-5" 23'-9" 15'-61/4" 3'-1/4"
23'-21/4"
7'-63/4" 9'-10" 2'-0"
6'-4"
4'-6"
1'-9" 6'-11/4"
1'-6"
min
3'-0"
3'-0"
4'-0"
3'-6"
4'-0"
8" glass
filler w/drain
bottle filler
Table/Shelving For Folding Laundry
WT4
WT4 WT4 WT4
WT4
WT4
WT4
WT4
WT4 WT4 WT4
WT4WT4
WT4WT4
Merch
UP
ADA Side
approach
shower
2 W 2 D
ADA Side
approach
shower
Existing
Location of
utilities
19 Risers (11'-0")
WC 1
111
61 sq ft
Elevator
102
39 sq ft
Staff Room
105
221 sq ft
Manager
104
112 sq ft
Staff Workstation
103
277 sq ft
Lobby
101
251 sq ft
Women's - Private
112
233 sq ft
Men's - Private
113
232 sq ft
Corridor
107
185 sq ft
Workroom
106
134 sq ft
Unisex
116
49 sq ft
Womens - Public
117
140 sq ft
Mens - Public
115
139 sq ft
Enclosed Utilities
114
203 sq ft
1
4
3
2
3
A204
3 6
5
A605
9
8
A605
D12 D15D14
12'-91/2"
12'-3"
16'-81/2" 16'-1/4"
WT4
WT4
WT4
WT4
WT4
WT4
WT4
WT4
WT4
WT4 WT4
WT4
WT4
WT4
WT4
WT4
JC
109
11 sq ft
Plan Notes:
1. Areas shown in gray are out of scope.
2. Provide all labeled doors and windows as shown and dimensioned
on plan. (see A401)
3. Provide 3" x 3" x 48" corner guards with aluminum retainers on all
exposed drywall corners at new walls.
4. Dimensions to be verified in field.
Existing walls to be verified as code compliant.
5. See A402 for Painting Notes
Wall Types:
WT1 Interior Partition to Deck
WT2 Interior Partition to 6" above Finished Ceiling
WT3 Plumbing Wall
WT4 Knee Wall
ETR Existing to Remain
N
SCALE: 1/4" = 1'-0"
1 First Floor
A101
AREA
First Floor: 2005 Sqft
Second Floor: 1651 Sqft
Total: 3655* sqft
* does not include enclosed utilities or public bathrooms
10
RevIDIssued ForDate
A102
4629 N Broadway
Chicago, IL 60640
773.561.1987
www.mdtarch.com
Printed: 5/1/26
New Marina Building
Second Story Plan
Sister Bay Marina
10733 Bay Shore Drive,
Sister Bay, Wisconsin
Plan Notes:
1. Areas shown in gray are out of scope.
2. Provide all labeled doors and windows as shown and dimensioned
on plan. (see A401)
3. Provide 3" x 3" x 48" corner guards with aluminum retainers on all
exposed drywall corners at new walls.
4. Dimensions to be verified in field.
Existing walls to be verified as code compliant.
5. See A402 for Painting Notes
Wall Types:
WT1 Interior Partition to Deck
WT2 Interior Partition to 6" above Finished Ceiling
WT3 Plumbing Wall
WT4 Knee Wall
ETR Existing to Remain
R
W17
W12
W12
W12
W13
W13
W13
W10 W10 W10
W11W11W11
W10 W10W10
D22
W08 W08
W14W14
W07
W07
D23
W18W15
D21
D24 D25
D26
W08
W08W14
W05 W05W09 W09 W09
D28
D27
DW
1
2
3
4 A608
3
2
1
4 A607
4
5
6
A605
7
9
8 A605
1
4
2
3
A204
3
18'-6"3'-81/2" 9'-0"
45'-83/4"
28'-101/2" 16'-10"
5'-2" 7'-6"
18'-5" 7'-3/4"7'-0"18'-113/4"
53'-11/2" 3'-61/4"
56'-73/4"
12'-81/2"
25'-13/4" 16'-2"
10'-41/4" 19'-0" 18'-13/4"
4'-0"
3'-0"
17'-63/4"
6'-81/2" 8'-11" 8'-1/2" 4'-61/4"
4'-83/4" 9'-113/4" 8'-1/4" 11'-1" 5'-61/4" 11'-7" 2'-23/4"
11'-11/2"
5'-91/4" 8'-6" 8'-53/4"
1'-111/2" 3'-2" 3'-2"
3'-0" 3'-0" 1'-101/4"
2 TVs HERE
AOR
DNDN
WC 3
206
52 sq ft
HVAC/Storage
207
184 sq ft
Conference
201
219 sq ft
WC 2
205
52 sq ftBoater's Lounge
202
683 sq ft
Corridor
204
76 sq ft
Stair
200
189 sq ft
Panoramic Room
203
291 sq ft
IT
208
12 sq ft
W06 W16W16W06
N
SCALE: 1/4" = 1'-0"
1 Second Floor
A102
AREA
First Floor: 2005 Sqft
Second Floor: 1651 Sqft
Total: 3655* sqft
* does not include enclosed utilities or public bathrooms
11
RevIDIssued ForDate
A103
4629 N Broadway
Chicago, IL 60640
773.561.1987
www.mdtarch.com
Printed: 5/1/26
New Marina Building
Roof Plan
Sister Bay Marina
10733 Bay Shore Drive,
Sister Bay, Wisconsin
1'-0"
typ roof overhang
6:12
Roof
Slope
6:12
Roof
Slope
6:12
Roof
Slope
6:12
Roof
Slope
6:12 Roof
Slope
6:12 Roof
Slope at
cricket
6:12
Roof
Slope
6:12
Roof
Slope
6:12
Roof
Slope
4:12 typ
Roof Slope
at cupola
6:12
Roof
Slope
6:12
Roof
Slope
SCALE: 1/4" = 1'-0"
1 Roof Plan
A103
12
RevIDIssued ForDate
A10x
4629 N Broadway
Chicago, IL 60640
773.561.1987
www.mdtarch.com
Printed: 5/1/26
New Marina Building
Foundation Plan
Sister Bay Marina
10733 Bay Shore Drive,
Sister Bay, Wisconsin
25'-2" 17'-6"
88'-51/2"
17'-61/8"
8'-85/8" 47'-103/8" 31'-101/2"
Elevator
Pit
t/concrete slab +0'-0"
8" (?) foundation wall
-17" min pit depth
SCALE: 1/4" = 1'-0"
1 Foundation
A10x
13
RevIDIssued ForDate
01 - WIPIssue for ReviewWork in
Progress
A104
4629 N Broadway
Chicago, IL 60640
773.561.1987
www.mdtarch.com
Printed: 5/1/26
New Marina Building
First Floor Reflected Ceiling
Plan
Sister Bay Marina
10733 Bay Shore Drive,
Sister Bay, Wisconsin
Reflected Ceiling Plan Notes:
1. Lighting to be uniform 3000 to 3500 K
depending upon availability per fixture.
L13
L13
L13
L13
L13
L15
L15
L15
2'-9"5'-51/2" 5'-51/2"2'-9"
3'-2"
3'-3"
2'-111/2" 4'-11" 2'-6"
4'-8"4'-8"3'-2"
3'-21/2"4'-91/2"4'-91/2"
6'-4" 8'-41/2" 8'-41/2" 7'-1/2"
3'-0"
3'-8" 3'-8" 3'-8"3'-8"
3'-8"3'-8"3'-8"
4'-11/2" 4'-11/2"
2'-6" 1'-101/2"
8'-6"
8'-6"
8'-6"
8'-6"
8'-6"8'-6" 8'-6" 8'-6"
7'-2"
7'-2"
8'-6" 8'-6" 8'-6"
Open to structure
7'-2"
3'-0"
UP
L8
L8
L8
L8
L8
L8
L3
L16
L1
+8'-6"
L10
L1L1L1
L1
L1 L1 L1
L3
L1
L1
L10
L10 L10
L10 L10
L10 L10
L10
L10
L4 L4
L10
L6
L1L1L1
L1
L1 L1 L1
L1
L10 L10
L10 L10
L10 L10
L10
L10
L18
L18L18
L18 L18
L18
L11
L11
L11
L11
L11
L3
L1
L10L10
L10L10
L10
L10
L10 L10
L10 L10
L1
L10
L10
L3
L3
L3
L3
L3
L3
L3
L3
L3 L3 L3L3
L3 L3 L3 L3
L10
L10
WC 1
111
61 sq ft
Elevator
102
39 sq ft
Staff Room
105
221 sq ft
Manager
104
112 sq ft
Staff Workstation
103
277 sq ft
Lobby
101
251 sq ft
Women's - Private
112
233 sq ft
Men's - Private
113
232 sq ft
Corridor
107
185 sq ft
Workroom
106
134 sq ft
Unisex
116
49 sq ft
Womens - Public
117
140 sq ft
Mens - Public
115
139 sq ft
Enclosed Utilities
114
203 sq ft
L1
L1
L4
L1
JC
109
11 sq ft
GBC-01
Gypsum Board Ceiling 9'-0" a.f.f. u.n.o.
Open
ceiling open to above
ACT-01
Acoustic Ceiling Tiles 9'-0" a.f.f. u.n.o.
Beadboard
Lobby Only
Ceiling Key
Recessed Light
Pendant
Wall Mounted Vanity Light
Exhaust Fan with Light
Under Cabinet Light
Wall Mounted Light
6" Recessed Downlight Waterproof
(Not in use)
Outdoor Flush Mount Fixture
L1
L2
L3
L4
L5
L6
L7
L9
L10
Wall Mounted Vanity LightL11
Horizontal Wall Mounted Vanity Light
(Not in use)L12
2'x4' Lay-In LED PanelL13
Wide Cage Flush Mount Ceiling Fixture
Horizontal Linear LED Pendant LampL14
L15 2'x2' Lay-In LED Panel
L8 48" LED Utility Surface Mounted Light
L16 Semi-Flush Mount Light
L17 Exit Light
L18 Emergency Light
Light Fixture Key
N
SCALE: 1/4" = 1'-0"
4 First Floor Reflected Ceiling Plan
A104
14
RevIDIssued ForDate
A105
4629 N Broadway
Chicago, IL 60640
773.561.1987
www.mdtarch.com
Printed: 5/1/26
New Marina Building
Second Floor Reflected Ceiling
Plan
Sister Bay Marina
10733 Bay Shore Drive,
Sister Bay, Wisconsin
L3
L3
L1 L1L1
L2
L2
L2
L2
L3
L1
3'-0" 6'-0" 3'-0"
8'-2" 4'-8"
4'-6" 5'-2"
4'-1/2" 8'-1" 4'-1/2"
4'-6"
3'-11/2" 6'-0" 6'-0" 3'-2"
2'-7"2'-7"4'-7"4'-7"4'-7"
eq eq eq eq eq
2'-11" 2'-11" 2'-11" 3'-1/2"
3'-8" 3'-8" 3'-8" 3'-8"
8'-0" 8'-0" 8'-0" 8'-0"
8'-2"
9'-1"
9'-1"
9'-1"
8'-6" 8'-6"
9'-1"
Vaulted Ceiling
9'-1"
L9
L9
L9
L2
L1
L14
L5 L5
L1
+9'-1"
L1L1
L1L1
L1L1
L1L1
L1
L1
L1
L6
L1
L1
L1
L1L1
Recessed Light
Pendant
Wall Mounted Vanity Light
Exhaust Fan with Light
Under Cabinet Light
Wall Mounted Light
6" Recessed Downlight Waterproof
L1
L2
L3
L4
L5
L6
L7
L8
L9
L10
L11
L12
L13
L14
L8
L8
L8
L16
L16
L16
L11L11
L16
WC 3
206
52 sq ft
HVAC/Storage
207
184 sq ft
Conference
201
219 sq ft
WC 2
205
52 sq ftBoater's Lounge
202
683 sq ft
Corridor
204
76 sq ft
Stair
200
189 sq ft
Panoramic Room
203
291 sq ft
IT
208
12 sq ft
Light Fixture Key
Reflected Ceiling Plan Notes:
1. Lighting to be uniform 3000 to 3500 K
depending upon availability per fixture.
Recessed Light
Pendant
Wall Mounted Vanity Light
Exhaust Fan with Light
Under Cabinet Light
Wall Mounted Light
6" Recessed Downlight Waterproof
(Not in use)
Outdoor Flush Mount Fixture
L1
L2
L3
L4
L5
L6
L7
L9
L10
Wall Mounted Vanity LightL11
Horizontal Wall Mounted Vanity Light
(Not in use)L12
2'x4' Lay-In LED PanelL13
Wide Cage Flush Mount Ceiling Fixture
Horizontal Linear LED Pendant LampL14
L15 2'x2' Lay-In LED Panel
L8 48" LED Utility Surface Mounted Light
L16 Semi-Flush Mount Light
L17 Exit Light
L18 Emergency Light
Light Fixture Key
GBC-01
Gypsum Board Ceiling 9'-0" a.f.f. u.n.o.
Open
ceiling open to above
ACT-01
Acoustic Ceiling Tiles 9'-0" a.f.f. u.n.o.
Tongue in groove wood
Outside Only
Ceiling Key
N
SCALE: 1/4" = 1'-0"
4 Second Floor Reflected Ceiling Plan
A105
15
RevIDIssued ForDate
01 - WIPIssue for ReviewWork in
Progress
A201
4629 N Broadway
Chicago, IL 60640
773.561.1987
www.mdtarch.com
Printed: 5/1/26
New Marina Building
Building Elevations
Sister Bay Marina
10733 Bay Shore Drive,
Sister Bay, Wisconsin
±0"
First Floor
+11'-0"
Second Floor
+20'-6"
Roof
+35'-0"
MAX HEIGHT
4
5 1
3
2
6
±0"
First Floor
+11'-0"
Second Floor
+20'-6"
Roof
+35'-0"
MAX HEIGHT
3'-6"
typ
4
5 1
3
2
6
4
SCALE: 1/4" = 1'-0"1 South Elevation
SCALE: 1/4" = 1'-0"2 East Elevation
Exterior Elevation Key
1. Hardie Shingle Staggered Edge Panel or equiv.
(COLOR TBD)
2. Stonewood Thin Stone Veneer (Manchester
Granite)
3. Stone Sill
4. Copper Standing Seam Roof. Contractor to bid
shingles as alternate.
5. Hardie Paneling
6. Wood Trim
16
RevIDIssued ForDate
A202
4629 N Broadway
Chicago, IL 60640
773.561.1987
www.mdtarch.com
Printed: 5/1/26
New Marina Building
Building Elevations
Sister Bay Marina
10733 Bay Shore Drive,
Sister Bay, Wisconsin
±0"
First Floor
+11'-0"
Second Floor
+20'-6"
Roof
+35'-0"
MAX HEIGHT
4
5
1
3
2
6
±0"
First Floor
+11'-0"
Second Floor
+20'-6"
Roof
+35'-0"
MAX HEIGHT
4
5 1
3
2
6
SCALE: 1/4" = 1'-0"4 West Elevation
SCALE: 1/4" = 1'-0"3 North Elevation
Exterior Elevation Key
1. Hardie Shingle Staggered Edge Panel or equiv.
(COLOR TBD)
2. Stonewood Thin Stone Veneer (Manchester
Granite)
3. Stone Sill
4. Copper Standing Seam Roof. Contractor to bid
shingles as alternate.
5. Hardie Paneling
6. Wood Trim
17
RevIDIssued ForDate
01 - WIPIssue for ReviewWork in
Progress
A203
4629 N Broadway
Chicago, IL 60640
773.561.1987
www.mdtarch.com
Printed: 5/1/26
New Marina Building
Building Sections
Sister Bay Marina
10733 Bay Shore Drive,
Sister Bay, Wisconsin
7
±0"
First Floor
+11'-0"
Second Floor
+20'-6"
Roof
+35'-0"
MAX HEIGHT
8'-6" 2'-6" 9'-1"
Finished Ceiling to Finished Floor -
Structure + MEP Pending Coordination
±0"
First Floor
+11'-0"
Second Floor
+20'-6"
Roof
+35'-0"
MAX HEIGHT
Finished Ceiling to Finished Floor -
Structure + MEP Pending Coordination
8'-6" 2'-6" 9'-1"
SCALE: 1/4" = 1'-0"1 East West Section
SCALE: 1/4" = 1'-0"2 North South Section
18
RevIDIssued ForDate
A204
4629 N Broadway
Chicago, IL 60640
773.561.1987
www.mdtarch.com
Printed: 5/1/26
New Marina Building
Building Sections II
Sister Bay Marina
10733 Bay Shore Drive,
Sister Bay, Wisconsin
3'-6"
typ
4
5 1
3
2
6
4
±0"
First Floor
+11'-0"
Second Floor
+20'-6"
Roof
+35'-0"
MAX HEIGHT
4
5 1
3
2
6
±0"
First Floor
+11'-0"
Second Floor
+20'-6"
Roof
+35'-0"
MAX HEIGHT
8'-6" 2'-6"
Finished Ceiling to Finished Floor -
Structure + MEP Pending Coordination
5'-10"
6'-8"
Finished Ceiling to Finished Floor -
Structure + MEP Pending Coordination
8'-6" 2'-6" 9'-1"
SCALE: 1/4" = 1'-0"1 Public Bathroom Section
SCALE: 1/4" = 1'-0"3 Stair Section
19
RevIDIssued ForDate
01 - WIPIssue for ReviewWork in
Progress
A401
4629 N Broadway
Chicago, IL 60640
773.561.1987
www.mdtarch.com
Printed: 5/1/26
New Marina Building
Wall Ceiling & Floor Types
Sister Bay Marina
10733 Bay Shore Drive,
Sister Bay, Wisconsin
CEILING TYPES
CT1 Acoustic Ceiling CT2 Gypsum Ceiling
WT1
5" Interior Partition Typ.
BASE PLAN HEAD
PLAN
WT3 Plumbing/Column Wall
BASE PLAN HEAD
WALL TYPES
CT3 Gypsum Ceiling With Wood Slats
WT2
Rated 5" Partition
BASE PLAN HEAD
Exterior Wall @ Shingles (PLAN VIEW)WT4 Requirement: R20 + R3.8 c.i.
43/4" 63/4"
43/4"
Steel hanger wire secured
to supporting structure
per manufacturer
2x4 or 2x2 Acoustical
Ceiling Tiles in accordance with
A102 Reflected Ceiling Plan &
A403 Finish Schedule 5/8" Type X gypsum Board
Open web wood truss
per structural drawings
Fiberglass Sound Batt
5/8" Type X Gypsum
Wallboard
2x4 Wood Studs @ 16" o.c.
2x4 Wood Sill
2x4 Wood header attached to
u/structure. Continuous
2x4 Wood header attached to
structure. Continuous
2x6 wood studs @ 16" O.C.
5/8" Type X Gypsum
Wallboard
Fiberglass Sound Batt
2x6 wood studs @ 16" O.C.
Fiberglass Sound Batt
5/8" Type X Gypsum
Wallboard
2x4 Wood Studs @ 16" o.c.
2x4 Wood Sill
2x4 Wood header attached to t/
structure. Continuous
Tounge and groove ceiling planks nailed
to structure. Planks should run perpindicular to trusses.
Nail at 45 degree angle into tounge to conceal nails.
Open web wood truss
2x6 wood studs @ 16" O.C.
5/8" Gypsum Board
5 1/2" Rigid Insulation or Batt
Insulation? R-20 min
3/4" Owens Corning Foamular NGX
250 Extruded Polystyrene Foam
Board Insulation (R-4 Continuous)
5/8" Plywood Exterior Sheathing
Weather Barrier
Wood Rainscreen Furring 3/8" Thick
Hardie Straight Edge Panel Shingle
Siding (Color TBD)
to structure to structure
use acoustic caulk at seams and joints
1 HR Rated per UL U419
Firestop all penetrations
87/16"
Min 3.5" Sound Batt
HILTI X-C P8 Power actuated
fastener @ 16" O.C.
20
RevIDIssued ForDate
01 - WIPIssue for ReviewWork in
Progress
A402
4629 N Broadway
Chicago, IL 60640
773.561.1987
www.mdtarch.com
Printed: 5/1/26
New Marina Building
Window Schedule
Sister Bay Marina
10733 Bay Shore Drive,
Sister Bay, Wisconsin
ID W01 W02 W03 W04 W05 W06 W07 W08 W09 W10 W10 W11 W12 W13 W14 W15 W16 W17 W18 W19 W20 W21 W22 W23
Size Width 3'-3" 2'-31/2" 6'-0" 4'-0" 5'-0" 4'-0" 4'-6" 6'-0" 2'-87/8" 2'-4" 3'-0" 2'-4" 2'-6" 2'-6" 6'-0" 11'-0" 2'-87/8" 3'-0" 3'-0" 4'-0" 2'-3" 3'-0" 5'-0" 5'-0"
Height 4'-6" 4'-6" 4'-6" 4'-6" 5'-0" 5'-0" 5'-0" 5'-0" 5'-0" 5'-0" 4'-0" 2'-13/4" 5'-0" 2'-13/4" 3'-0" 8'-0" 4'-0" 3'-0" 3'-0" 2'-0" 3'-6" 4'-6" 4'-0" 5'-0"
View from Opening Side
QTY 2 3 2 4 2 2 2 4 3 3 1 3 3 3 3 1 2 1 4 2 1 2 1 3
Construction Material
Operation
Glazing (see schedule)
Glass Area (sf)
Vent Area (sf)
Manufacturer
Model
delete this line & below
Areas from mfg data or
measured from elevation
WINDOW TYPES
DOOR SCHEDULE
ID
D01
D03
D04
D05
D06
D07
D08
D09
D09a
D09a
D09a
D09a
D09a
D10
D11
D12
D13
D14
D15
D17
D19
D20
D21
D22
D23
D24
D25
D26
D27
D28
From Zone
Lobby
<Undefined>
<Undefined>
<Undefined>
<Undefined>
Workroom
Staff Workstation
Lobby
<Undefined>
Boater's Lounge
Boater's Lounge
Boater's Lounge
Staff Room
Lobby
Staff Workstation
Staff Workstation
<Undefined>
Women's - Private
<Undefined>
JC
WC 1
Corridor
<Undefined>
<Undefined>
<Undefined>
<Undefined>
<Undefined>
Corridor
HVAC/Storage
<Undefined>
To Zone
<Undefined>
Enclosed Utilities
Mens - Public
Unisex
Womens - Public
<Undefined>
<Undefined>
Staff Workstation
Elevator
<Undefined>
<Undefined>
Boater's Lounge
<Undefined>
<Undefined>
Manager
<Undefined>
<Undefined>
Women's - Private
<Undefined>
<Undefined>
WC 1
<Undefined>
<Undefined>
<Undefined>
<Undefined>
WC 2
WC 3
<Undefined>
HVAC/Storage
<Undefined>
Dimensions
Width
9'-73/4"
3'-0"
3'-0"
3'-0"
3'-0"
6'-0"
3'-2"
3'-0"
3'-0"
3'-0"
4'-0"
4'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
7'-0"
3'-0"
3'-0"
3'-0"
3'-0"
14'-0"
Height
8'-23/8"
7'-0"
7'-0"
7'-0"
7'-0"
6'-8"
8'5/8"
7'-0"
6'-0"
6'-0"
7'-0"
7'-0"
7'-0"
7'-0"
7'-0"
7'-0"
7'-0"
7'-0"
7'-0"
7'-0"
7'-0"
7'-0"
7'-0"
7'-0"
7'-101/2"
7'-0"
7'-0"
7'-0"
7'-0"
6'-105/8"
Thickness
15/8"
13/4"
13/4"
13/4"
13/4"
13/4"
15/8"
13/4"
15/8"
15/8"
15/8"
15/8"
13/4"
13/4"
13/4"
13/4"
13/4"
13/4"
13/4"
13/4"
13/4"
13/4"
13/4"
13/4"
15/8"
13/4"
13/4"
13/4"
13/4"
2"
Door
Type
Frame
Type
Fire
Rating
---
---
---
---
HW
Set
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
K Notes
Hardware Set
SET 1 Entry: Exterior
3pr. butts
2 closer
2 pull
1 exit device
1 threshold
1 set weatherstripping
SET 2 Entry: Interior
3pr. butts
2 closer
1 set push/pull
SET 3 Entry: Exterior
1.5 pr. butts
1 closer
1 mortise Lockset
1 exit device
1 threshold
1 set weatherstripping
SET 4 Office Conference Room
1.5pr. butts
1 closer
1 office lockset
1 set door silencers
1 wall or floor stop as appropriate
SET 5 Toliet
1.5pr. butts
1 closer
1 privacy lockset
2 stainless steel kickplates
SET 6 Utility
1.5pr. butts
1 closer
1 storeroom lockset
2 stainless steel kickplates
1 set door silencers
SET 7 Bi-Passing
2 bi-passing hardware sets
includes: track
hangers
floor guide
pulls
SET 8 Gate
1.5pr. butts
1 roller catch set
1 push/pull
Hardware Set
SET 1 Entry: Exterior
3pr. butts
2 closer
2 pull
1 exit device
1 threshold
1 set weatherstripping
SET 2 Entry: Interior
3pr. butts
2 closer
1 set push/pull
SET 3 Entry: Exterior
1.5 pr. butts
1 closer
1 mortise Lockset
1 exit device
1 threshold
1 set weatherstripping
SET 4 Office Conference Room
1.5pr. butts
1 closer
1 office lockset
1 set door silencers
1 wall or floor stop as appropriate
SET 5 Toliet
1.5pr. butts
1 closer
1 privacy lockset
2 stainless steel kickplates
SET 6 Utility
1.5pr. butts
1 closer
1 storeroom lockset
2 stainless steel kickplates
1 set door silencers
SET 7 Bi-Passing
2 bi-passing hardware sets
includes: track
hangers
floor guide
pulls
SET 8 Gate
1.5pr. butts
1 roller catch set
1 push/pull
Hardware Set
SET 1 Entry: Exterior
3pr. butts
2 closer
2 pull
1 exit device
1 threshold
1 set weatherstripping
SET 2 Entry: Interior
3pr. butts
2 closer
1 set push/pull
SET 3 Entry: Exterior
1.5 pr. butts
1 closer
1 mortise Lockset
1 exit device
1 threshold
1 set weatherstripping
SET 4 Office Conference Room
1.5pr. butts
1 closer
1 office lockset
1 set door silencers
1 wall or floor stop as appropriate
SET 5 Toliet
1.5pr. butts
1 closer
1 privacy lockset
2 stainless steel kickplates
SET 6 Utility
1.5pr. butts
1 closer
1 storeroom lockset
2 stainless steel kickplates
1 set door silencers
SET 7 Bi-Passing
2 bi-passing hardware sets
includes: track
hangers
floor guide
pulls
SET 8 Gate
1 pr. butts
1 passage latchset
WORK IN PROGRESS
21
RevIDIssued ForDate
A601
4629 N Broadway
Chicago, IL 60640
773.561.1987
www.mdtarch.com
Printed: 5/1/26
New Marina Building
Interior Elevations
Sister Bay Marina
10733 Bay Shore Drive,
Sister Bay, Wisconsin
3'-6"
2'-6"
3'-10"
4'-0" 4'-0"
3'-0" 2"4"
2'-10"
ECB
PT-1
WBB
W01 W01 W02 W02 W02
D01
2'-0" 2'-0"
2'-0"2'-10"
3'-6"
2'-10"
3'-0" 2"4"
ECB
PT-1
WBB
8" glass filler with drain
elevator
Artwork by owner
3'-6"
4" 3'-0" 2"
4'-4" 11/2"
2'-9"
3'-4"
2'-6"
min clear space
ECB
PT-1
WBB
D10
Artwork by owner
1'-6" 11/2" 1'-6" 11/2"2'-10"
3'-0" 2"4"
3'-0"
5'-0"
D09
W02
D08
Freezer by owner
ECB
PT-1
WBB
PL
3'-6"
2'-0" 2'-0"
2'-6"
SCALE: 1/2" = 1'-0"
1 Lobby - South
A601
SCALE: 1/2" = 1'-0"
2 Lobby - East
A601 SCALE: 1/2" = 1'-0"
3 Lobby - North
A601
SCALE: 1/2" = 1'-0"
4 Lobby - West
A601
+0"
First Floor
-
+0"
First Floor
-
+8'-6"
Ceiling
+5'-3"
Stair
+0"
First Floor
-
+0"
First Floor
-
+7'-2"
Soffit
+7'-2"
Soffit
+8'-6"
Ceiling
+8'-6"
Ceiling
LOBBY
+8'-6"
Ceiling
22
RevIDIssued ForDate
A602
4629 N Broadway
Chicago, IL 60640
773.561.1987
www.mdtarch.com
Printed: 5/1/26
New Marina Building
Interior Elevations
Sister Bay Marina
10733 Bay Shore Drive,
Sister Bay, Wisconsin
3'-6"
4"
5'-0"
D09ECB
PT-1
Open to lobby
2'-6"
3'-0"
2'-6"
4"
2'-0"
D08
W02 W02
ECB
PT-1
2'-6"
4"
D12
MonitorMonitor
ECB
PT-1
1'-8" 1'-0" 2'-0" 2'-6"
1'-0" 2'-0" 2'-6"
2'-10" 1'-6" 2'-0"
2'-3"
2'-6"
D12
ref
faucet
microwave
by owner
ECB
PT-1
2'-3/4"
4"
2'-10" 1'-6" 2'-0"
D09a1'-0"
ECB
PT-1
SCALE: 1/2" = 1'-0"
1 Staff Room 1
A602 SCALE: 1/2" = 1'-0"
3 Staff Room 1
A602 SCALE: 1/2" = 1'-0"
4 Staff Room 1
A602
SCALE: 1/2" = 1'-0"
13 Staff Room 2
A602 SCALE: 1/2" = 1'-0"
2 Staff Room 2
A602
+0"
First Floor
-
+8'-6"
Ceiling
+0"
First Floor
-
+8'-6"
Ceiling
+0"
First Floor
-
+8'-6"
Ceiling
STAFF ROOM 1
STAFF ROOM 2
+0"
First Floor
-
+8'-6"
Ceiling
+0"
First Floor
-
+8'-6"
Ceiling
23
RevIDIssued ForDate
A603
4629 N Broadway
Chicago, IL 60640
773.561.1987
www.mdtarch.com
Printed: 5/1/26
New Marina Building
Interior Elevations
Sister Bay Marina
10733 Bay Shore Drive,
Sister Bay, Wisconsin
1'-6"
uniform 33" to 36"
to top of grip surface
5"
3'-4"
2'-10"
2'-5"
5'-0" 1" 3'-0" 1" 3'-0" 1"
2'-0"1'-0"
5'-0"
6"7'-0"
1'-3"
mirror
PT-1
CWT
5'-0"
27" max
38" to 48" to controls
3'-0"
CWT
PT-1
continuous shower pan continuous shower pan
3' x 3' clear one piece ADA shower
stall, 1/2" max. beveled threshold,
inset in existing concrete slab per
manufacturer's instructions
adjustable shower
head
72" h. shower curtain
and rod
3'-4"
5'-0"
2'-10"
33" to 36" to t/bar
1'-6"
17" to 19"
insulated exposed piping
PTD
continuous shower pan
gb
PT-1
CWT
3'-6" 1'-0"
3'-4" 1'-6"
1'-3"
9"
1'-6"
3'-4"
3'-0"
5'-0"
continuous shower pan
PT-1
CWT
1'-6"
uniform 33" to 36"
to top of grip surface
5"
3'-4"
6"7'-0"
2'-0"
5'-0"
2'-0" 1'-0"
1" 3'-0" 1" 3'-0" 1" 5'-0"
2'-10"
insulated exposed piping
mirror
CWT
PT-1
3'-4"
5'-0"
2'-10"
33" to 36" to t/bar
17" to 19"
1'-6"
insulated exposed piping
CWT
PT-1
PTD
continuous shower pan
gb
3'-4" 1'-6"
1'-3"
1'-6"
3'-4"
3'-0"
3'-6"1'-0"
8"
5'-0"
PT-1
CWT
SCALE: 1/2" = 1'-0"
2 Women's Bathroom
A603
SCALE: 1/2" = 1'-0"
4 Women's Bathroom
A603
SCALE: 1/2" = 1'-0"
1 Women's Bathroom
A603 SCALE: 1/2" = 1'-0"
3 Women's Bathroom
A603
SCALE: 1/2" = 1'-0"
7 Men's Bathroom
A603 SCALE: 1/2" = 1'-0"
8 Men's Bathroom
A603
SCALE: 1/2" = 1'-0"
5 Men's Bathroom
A603
+0"
First Floor
-
+8'-6"
Ceiling
+0"
First Floor
-
+8'-6"
Ceiling
+0"
First Floor
-
+8'-6"
Ceiling
+0"
First Floor
-
+8'-6"
Ceiling
+0"
First Floor
-
+8'-6"
Ceiling
+0"
First Floor
-
+8'-6"
Ceiling
WOMEN'S BATHROOM -Private
MEN'S BATHROOM
+0"
First Floor
-
+8'-6"
Ceiling
MEN'S BATHROOM
3' x 3' clear one piece
ADA shower stall, 1/2"
max. beveled threshold,
inset in existing
concrete slab per
manufacturer's
instructions
3' x 3' clear one piece
ADA shower stall, 1/2"
max. beveled
threshold, inset in
existing concrete slab
per manufacturer's
instructions
folding shower seat
folding shower seat
24
RevIDIssued ForDate
A604
4629 N Broadway
Chicago, IL 60640
773.561.1987
www.mdtarch.com
Printed: 5/1/26
New Marina Building
Interior Elevations
Sister Bay Marina
10733 Bay Shore Drive,
Sister Bay, Wisconsin
1'-6"
1'-3"
8"
3'-6" 1'-0"
3'-4"
1'-6"3'-4"
3'-0"
5'-0"
CWT
PT-1
3'-4"
2'-10"
5'-0"
insulated exposed piping
CWT
PT-1
PTD
2'-10"
5'-0"
insulated exposed piping
CWT
PT-1
3'-4"
3'-4" 1'-6"
1'-3"
81/8"
3'-0"
3'-6" 1'-0"
1'-6"
5'-0"
CWT
PT-1
2'-10"
5'-0"
insulated exposed piping
CWT
PT-1
1'-6"
3'-0"
1'-6"3'-4"
3'-4"
3'-6"1'-0"
1'-3"
8"
5'-0"
CWT
PT-1
2'-10"
3'-4"
5"
2'-0"
5'-0"
1'-6"
3'-0"
1'-0" 2'-0"
5'-0" 1" 3'-21/8"
6"7'-0"
insulated exposed piping
mirror
CWT
PT-1
2'-10"
3'-4"
5"
5'-0"
3'-0"
1'-6"
2'-0" 1'-0"
3'-21/8" 1" 5'-0"
6"7'-0"
insulated exposed piping
mirror
CWT
PT-1
2'-10"
1'-6" 2'-6" min. clear
5'-0"
3'-4"
3'-0"
1'-0" 2'-0"
6"7'-0"
mirror
CWT
PT-1
SCALE: 1/2" = 1'-0"
3 Unisex Bathroom
A604SCALE: 1/2" = 1'-0"
2 Unisex Bathroom
A604
SCALE: 1/2" = 1'-0"
5 Men's Public Bathroom
A604 SCALE: 1/2" = 1'-0"
6 Men's Public Bathroom
A604
SCALE: 1/2" = 1'-0"
8 Women's Public Bathroom
A604 SCALE: 1/2" = 1'-0"
9 Women's Public Bathroom
A604
SCALE: 1/2" = 1'-0"
4 Men's Public Bathroom
A604
SCALE: 1/2" = 1'-0"
7 Women's Public Bathroom
A604
SCALE: 1/2" = 1'-0"
1 Unisex Bathroom
A604
+0"
First Floor
-
+8'-6"
Ceiling
+0"
First Floor
-
+8'-6"
Ceiling
+0"
First Floor
-
+8'-6"
Ceiling
+0"
First Floor
-
+8'-6"
Ceiling
+0"
First Floor
-
+8'-6"
Ceiling
+0"
First Floor
-
+8'-6"
Ceiling
+0"
First Floor
-
+8'-6"
Ceiling
+0"
First Floor
-
+8'-6"
Ceiling
+0"
First Floor
-
+8'-6"
Ceiling
UNISEX BATHROOM
MEN'S PUBLIC BATHROOM
WOMEN'S PUBLIC BATHROOM
25
RevIDIssued ForDate
A605
4629 N Broadway
Chicago, IL 60640
773.561.1987
www.mdtarch.com
Printed: 5/1/26
New Marina Building
Interior Elevations
Sister Bay Marina
10733 Bay Shore Drive,
Sister Bay, Wisconsin
2'-10"
2'-6" min. clear
5'-0"
3'-4"
6"7'-0"mirror CWT
PT-1
3'-4"
2'-10"
CWT
PT-1
PTD CWT
5'-0"
1'-6"
1'-3"
8"
1'-6"3'-4"
3'-0"
3'-4"
3'-6" 1'-0"
CWT
PT-1
2'-10"
2'-6" min. clear
3'-4"
3'-0"
1'-0" 2'-0"
1'-6"
5'-0"
6"7'-0"mirror
CWT
PT-1
3'-4"
2'-10"
5'-0"
insulated exposed piping
CWT
PT-1
PTD
5'-0"
3'-4"
3'-4" 1'-6"
3'-0"
1'-3"
1'-6"
9"
1'-0" 3'-6"
CWT
PT-1
2'-6" min. clear
5'-0"
2'-10"
3'-4"
3'-0"
2'-0" 1'-0"
1'-6"
6"7'-0"mirror
CWT
PT-1
5'-0"
3'-4"
2'-10"
insulated exposed piping
CWT
PT-1
PTD
SCALE: 1/2" = 1'-0"
1 WC - 1
A605 SCALE: 1/2" = 1'-0"
2 WC - 1
A605 SCALE: 1/2" = 1'-0"
3 WC - 1
A605
SCALE: 1/2" = 1'-0"
4 WC 2
A605 SCALE: 1/2" = 1'-0"
5 WC 2
A605 SCALE: 1/2" = 1'-0"
6 WC 2
A605
SCALE: 1/2" = 1'-0"
7 WC 3
A605 SCALE: 1/2" = 1'-0"
8 WC 3
A605 SCALE: 1/2" = 1'-0"
9 WC 3
A605
+0"
First Floor
-
+8'-6"
Ceiling
+0"
First Floor
-
+8'-6"
Ceiling
+0"
First Floor
-
+8'-6"
Ceiling
+0"
First Floor
-
+8'-6"
Ceiling
+0"
First Floor
-
+8'-6"
Ceiling
+0"
First Floor
-
+8'-6"
Ceiling
+0"
First Floor
-
+8'-6"
Ceiling
+0"
First Floor
-
+8'-6"
Ceiling
+0"
First Floor
-
+8'-6"
Ceiling
BATHROOM 01
BATHROOM 02
BATHROOM 03
REVISIONS WIP
26
RevIDIssued ForDate
A606
4629 N Broadway
Chicago, IL 60640
773.561.1987
www.mdtarch.com
Printed: 5/1/26
New Marina Building
Interior Elevations
Sister Bay Marina
10733 Bay Shore Drive,
Sister Bay, Wisconsin
4" 3'-0" 2"
3'-6"
2'-10" 2'-6" 2'-0"
8'-0"
to soffit
ECB
PT-1
WBB
faucet
2 TVs by owner
2'-0" 2'-0"2'-6" 2'-0"
2'-0" 2'-0"2'-6" 2'-0"
2'-10" 2'-6" 2'-0"
3'-6"
4"
8'-0"
to soffit
4" 2"3'-0"
3'-0"
ECB
PT-1
WBB
ref faucet
Artwork by owner
CWT
microwave
by owner
3'-0" 2"
3'-6"
2'-6" 2'-0"2'-10"
8'-0"
to soffit
ECB
PT-1
WBB
4" 3'-0" 2"
3'-6"
ECB
PT-1
WBB
SCALE: 1/2" = 1'-0"
2 Boater's Lounge
A606
SCALE: 1/2" = 1'-0"
1 Boater's Lounge
A606 SCALE: 1/2" = 1'-0"
3 Boater's Lounge
A606
SCALE: 1/2" = 1'-0"
4 Boater's Lounge
A606
+0"
First Floor
-
+9'-1"
Ceiling
+0"
First Floor
-
+9'-1"
Ceiling
+0"
First Floor
-
+9'-1"
Ceiling
+0"
First Floor
-
+9'-1"
Ceiling
BOATER'S LOUNGE
27
RevIDIssued ForDate
A607
4629 N Broadway
Chicago, IL 60640
773.561.1987
www.mdtarch.com
Printed: 5/1/26
New Marina Building
Interior Elevations
Sister Bay Marina
10733 Bay Shore Drive,
Sister Bay, Wisconsin
4" 3'-0" 2"
3'-6"
PT-1
WBB
ECB
Boaters lounge beyond
4" 3'-0" 2"
3'-6"
ECB
PT-1
WBB
tg tg tg tg
4" 3'-0" 2"
3'-6"
ECB
PT-1
WBB
tg tg
4" 3'-0" 2"
3'-6"
ECB
PT-1
WBB
SCALE: 1/2" = 1'-0"
2 Boater's Lounge
A607 SCALE: 1/2" = 1'-0"
1 Boater's Lounge
A607
SCALE: 1/2" = 1'-0"
3 Boater's Lounge
A607 SCALE: 1/2" = 1'-0"
4 Boater's Lounge
A607
+0"
First Floor
- +0"
First Floor
-
+0"
First Floor
- +0"
First Floor
-
BOATER'S LOUNGE
28
RevIDIssued ForDate
01 - WIPIssue for ReviewWork in
Progress
A701
4629 N Broadway
Chicago, IL 60640
773.561.1987
www.mdtarch.com
Printed: 5/1/26
New Marina Building
Millwork
Sister Bay Marina
10733 Bay Shore Drive,
Sister Bay, Wisconsin
Base Cabinets
B3
2'-10"
3"
1"
2'-5"
4"
Base Cabinet with Sink (PLAM backsplash)
3"
Laminate Work Surface
Sink where shown
Shelf on Adjustable Pins
Birch Veneer Doors with
Particle Board Interior
B1
2'-5"
11/2"
4"
2'-10"
1"
3"
Base Cabinet with
adjustable shelving
Base Cabinet (PLAM backsplash)
Laminate Work Surface
with 4" Backsplash
M2 Custom Wall Shelf
9"
see elevations for heights
Blocking in Wall
3/4" Thickness Cleats
Fixed Shelfs see elevation for heights
Existing wall
B2
2'-10"
2'-5"
3/4"4"
eq.eq. eq. eq. 3"
Base Cabinet w/4 drawers
Laminate Work Surface
with 4" Backsplash
Drawers on 22" slides
Birch Drawer Fronts with
Particle Board Interior
29
RevIDIssued ForDate
A202
4629 N Broadway
Chicago, IL 60640
773.561.1987
www.mdtarch.com
Printed: 4/14/26
New Marina Building
Building Elevations
Sister Bay Marina
10733 Bay Shore Drive,
Sister Bay, Wisconsin
±0"
First Floor
+10'-6"
Second Floor
+20'-6"
Roof
+35'-0"
MAX HEIGHT
4
5
1
3
2
6
±0"
First Floor
+10'-6"
Second Floor
+20'-6"
Roof
+35'-0"
MAX HEIGHT
4
5 1
3
2
6
SCALE: 1/4" = 1'-0"4 West Elevation
SCALE: 1/4" = 1'-0"3 North Elevation
Exterior Elevation Key
1. Hardie Shingle Staggered Edge Panel (COLOR
TBD)
2. Stonewood Thin Stone Veneer (Manchester
Granite)
3. Stone Sill
4. Copper Standing Seam Roof. Contractor to bid
shingles as alternate.
5. Hardie Panel
6. Wood Trim
30
Boardwalk Project Expense Report
Boardwalk Expenses:
Ipe wood and attachment Hardware – 103,739.00
Removal/Disposal/Installation - 77,693.00
Plumbing - 6,001.00
Total - 187,433.00
Budgeted Project Amount - 250,000.00
Difference - Savings - 62,567.00
31
32
33
VILLAGE OF SISTER BAY
REVENUES WITH COMPARISON TO BUDGET
FOR THE 4 MONTHS ENDING APRIL 30, 2026
MARINA
PERIOD BUDGET % OF
ACTUAL YTD ACTUAL AMOUNT VARIANCE BUDGET
FOR ADMINISTRATION USE ONLY 33 % OF THE FISCAL YEAR HAS ELAPSED 05/15/2026 03:16PM PAGE: 1
690-42800-000-000 AMORTIZATION OF PREMIUM .00 .00 2,803.00 ( 2,803.00) .00
.00 .00 2,803.00 ( 2,803.00) .00
690-46371-000-000 SEASONAL SLIP FEES 39,278.42 489,510.16 467,851.00 21,659.16 104.63
690-46372-000-000 DAILY DOCKING/TRANSIENT FEES 13,772.04 171,362.13 278,500.00 ( 107,137.87) 61.53
690-46373-000-000 LAUNCH FEES .00 .00 16,500.00 ( 16,500.00) .00
690-46375-000-000 PUMP OUT SERVICES .00 165.09 2,350.00 ( 2,184.91) 7.03
690-46376-000-000 COMMERCIAL DOCKING 34,075.00 48,645.00 144,244.00 ( 95,599.00) 33.72
690-46377-000-000 DISCOUNTED SALES .00 .00 ( 1,000.00) 1,000.00 .00
690-46380-000-000 LAUNDRY NON-TAXABLE .00 .00 500.00 ( 500.00) .00
690-46381-000-000 PRODUCT SALES .00 .00 8,000.00 ( 8,000.00) .00
690-46383-000-000 NON TAXABLE PRODUCT SALES .00 .00 500.00 ( 500.00) .00
87,125.46 709,682.38 917,445.00 ( 207,762.62) 77.35
690-48110-000-000 INTEREST ON INVESTMENTS 4,250.18 18,123.56 50,000.00 ( 31,876.44) 36.25
690-48995-000-000 MISC OTHER REVENUE .00 258.97 300.00 ( 41.03) 86.32
4,250.18 18,382.53 50,300.00 ( 31,917.47) 36.55
690-49240-000-000 TRANSFERS FROM CIP FUND .00 .00 1,000,000.00 ( 1,000,000.00) .00
.00 .00 1,000,000.00 ( 1,000,000.00) .00
TOTAL FUND REVENUE 91,375.64 728,064.91 1,970,548.00 ( 1,242,483.09) 36.95
34
VILLAGE OF SISTER BAY
EXPENDITURES WITH COMPARISON TO BUDGET
FOR THE 4 MONTHS ENDING APRIL 30, 2026
MARINA
PERIOD BUDGET % OF
ACTUAL YTD ACTUAL AMOUNT BUDGET
FOR ADMINISTRATION USE ONLY 33 % OF THE FISCAL YEAR HAS ELAPSED 05/15/2026 03:16PM PAGE: 2
690-53540-111-000 FULL-TIME WAGES 9,793.80 41,266.97 128,785.84 87,518.87 32.04
690-53540-111-051 FULL-TIME WAGES FACILITIES 381.62 1,033.81 9,767.00 8,733.19 10.58
690-53540-111-920 FULL-TIME WAGES ADMIN 1,292.36 5,386.50 16,234.00 10,847.50 33.18
690-53540-114-000 UNWORKED WAGES .00 2,805.13 1,469.04 ( 1,336.09) 190.95
690-53540-121-000 PART-TIME WAGES .00 .00 72,130.00 72,130.00 .00
690-53540-122-000 PART-TIME OVERTIME WAGES .00 .00 10,200.00 10,200.00 .00
690-53540-123-000 BONUSES, DOCKMASTERS .00 .00 3,050.00 3,050.00 .00
690-53540-131-000 RETIREMENT 825.67 3,635.31 11,099.00 7,463.69 32.75
690-53540-132-000 SOCIAL SECURITY 896.22 3,951.40 18,571.00 14,619.60 21.28
690-53540-133-000 INSURANCE, MEDICAL 1,413.66 6,074.21 22,837.00 16,762.79 26.60
690-53540-134-000 INSURANCE, DENTAL 62.12 260.25 1,094.00 833.75 23.79
690-53540-135-000 INSURANCE, GROUP LIFE 1.66 6.15 59.00 52.85 10.42
690-53540-136-000 INSURANCE, DISABILITY 50.38 221.70 625.00 403.30 35.47
690-53540-137-000 HSA BENEFITS EXPENSE 414.18 1,855.82 6,064.00 4,208.18 30.60
690-53540-138-000 EAP BENEFITS EXPENSE 45.94 68.90 166.00 97.10 41.51
690-53540-140-000 VISION BENEFITS 6.30 25.85 121.00 95.15 21.36
690-53540-141-000 UNIFORM ALLOWANCE .00 .00 2,000.00 2,000.00 .00
690-53540-142-000 RECRUITMENT/TESTING/PHYSICALS .00 .00 500.00 500.00 .00
690-53540-143-000 RECOGNITION .00 .00 700.00 700.00 .00
690-53540-144-000 MILEAGE .00 379.90 400.00 20.10 94.98
690-53540-145-000 EXPENSE ALLOWANCE .00 .00 200.00 200.00 .00
PERSONNEL 15,183.91 66,971.90 306,071.88 239,099.98 21.88
690-53540-201-000 ELECTRIC/GAS 3,924.38 6,455.13 24,000.00 17,544.87 26.90
690-53540-202-000 WATER/SEWER/STORM 2,683.37 2,683.37 10,000.00 7,316.63 26.83
690-53540-203-000 TELEPHONE 69.70 72.82 1,260.00 1,187.18 5.78
690-53540-204-000 CELL PHONE 71.89 286.90 275.00 ( 11.90) 104.33
690-53540-205-000 INTERNET 330.00 1,295.15 4,500.00 3,204.85 28.78
690-53540-206-000 TELEVISION .00 .00 850.00 850.00 .00
690-53540-207-000 RECYCLING .00 .00 1,000.00 1,000.00 .00
690-53540-208-000 GARBAGE .00 .00 5,000.00 5,000.00 .00
690-53540-209-000 LEGAL 168.75 168.75 500.00 331.25 33.75
690-53540-210-000 AUDITING & CONSULTING .00 1,465.14 10,000.00 8,534.86 14.65
690-53540-211-000 WEED CONTROL .00 205.00 4,500.00 4,295.00 4.56
690-53540-212-000 ENGINEERING .00 13,400.00 .00 ( 13,400.00) .00
690-53540-214-000 HOLDING TANK EXPENSE .00 .00 200.00 200.00 .00
CONTRACTUAL SERVICES 7,248.09 26,032.26 62,085.00 36,052.74 41.93
35
VILLAGE OF SISTER BAY
EXPENDITURES WITH COMPARISON TO BUDGET
FOR THE 4 MONTHS ENDING APRIL 30, 2026
MARINA
PERIOD BUDGET % OF
ACTUAL YTD ACTUAL AMOUNT BUDGET
FOR ADMINISTRATION USE ONLY 33 % OF THE FISCAL YEAR HAS ELAPSED 05/15/2026 03:16PM PAGE: 3
690-53540-301-000 VEHICLE & EQUIPMENT GAS, OIL, .00 .00 250.00 250.00 .00
690-53540-303-000 EQUIPMENT RENTAL .00 4.32 350.00 345.68 1.23
690-53540-310-000 COMPUTER SOFTWARE MAINTENANCE 194.00 3,410.59 13,200.00 9,789.41 25.84
690-53540-311-000 WEBSITE .00 .00 1,000.00 1,000.00 .00
690-53540-312-000 IT SUPPORT 800.00 2,680.00 4,000.00 1,320.00 67.00
690-53540-321-000 OFFICE SUPPLIES 93.10 93.10 1,000.00 906.90 9.31
690-53540-322-000 POSTAGE 8.88 49.58 300.00 250.42 16.53
690-53540-324-000 PRINTING/COPYING .00 .24 2,750.00 2,749.76 .01
690-53540-325-000 ADVERTISING & PUBLIC NOTICES .00 .00 2,000.00 2,000.00 .00
690-53540-331-000 MEMBERSHIP DUES .00 25.00 850.00 825.00 2.94
690-53540-332-000 EDUCATION/TRAINING .00 3,860.31 7,500.00 3,639.69 51.47
690-53540-351-000 MEDICAL/SAFETY SUPPLIES .00 .00 1,500.00 1,500.00 .00
690-53540-352-000 MINOR EQUIPMENT AND TOOLS .00 .00 10,000.00 10,000.00 .00
690-53540-353-000 GENERAL SUPPLIES 13.91 13.91 4,000.00 3,986.09 .35
690-53540-354-000 SUPPLIES FOR RESALE 2,700.34 2,700.34 3,500.00 799.66 77.15
690-53540-357-000 EVENT COSTS 2,325.00 2,325.00 2,000.00 ( 325.00) 116.25
690-53540-362-000 GROUNDS MAINTENANCE .00 .00 3,500.00 3,500.00 .00
690-53540-366-000 BUILDING MAINTENANCE 9,976.39 10,976.39 1,276,500.00 1,265,523.61 .86
690-53540-368-000 DOCK MAINTENANCE 55,296.00 179,929.27 375,000.00 195,070.73 47.98
690-53540-369-000 EQUIPMENT MAINTENANCE 1,379.96 1,379.96 11,950.00 10,570.04 11.55
690-53540-392-000 MISCELLANEOUS .00 .00 100.00 100.00 .00
SUPPLIES AND EXPENSE 72,787.58 207,448.01 1,721,250.00 1,513,801.99 12.05
690-53540-401-000 CUSTODIAL SUPPLIES .00 .00 4,000.00 4,000.00 .00
690-53540-408-000 CONTINGENCY , MARINA .00 .00 5,000.00 5,000.00 .00
BUILDING MATERIALS .00 .00 9,000.00 9,000.00 .00
690-53540-510-000 PROPERTY & LIABILITY INSURANCE .00 21,469.63 24,000.00 2,530.37 89.46
690-53540-512-000 INSURANCE, WORK COMP .00 1,488.95 9,000.00 7,511.05 16.54
690-53540-550-000 BANK SERVICE CHARGES 1,142.22 9,231.40 19,000.00 9,768.60 48.59
690-53540-551-000 OTHER FEES AND CHARGES .00 .00 500.00 500.00 .00
690-53540-599-000 LICENSE AND PERMIT FEES .00 .00 500.00 500.00 .00
FIXED CHARGES 1,142.22 32,189.98 53,000.00 20,810.02 60.74
690-53540-602-000 INTEREST .00 14,612.50 30,996.34 16,383.84 47.14
DEBT SERVICE .00 14,612.50 30,996.34 16,383.84 47.14
690-53540-899-000 DEPRECIATION 9,250.00 37,000.00 111,000.00 74,000.00 33.33
CAPITAL OUTLAY 9,250.00 37,000.00 111,000.00 74,000.00 33.33
TOTAL DEPARTMENT 540 105,611.80 384,254.65 2,293,403.22 1,909,148.57 16.75
DEPARTMENT 541
36
VILLAGE OF SISTER BAY
EXPENDITURES WITH COMPARISON TO BUDGET
FOR THE 4 MONTHS ENDING APRIL 30, 2026
MARINA
PERIOD BUDGET % OF
ACTUAL YTD ACTUAL AMOUNT BUDGET
FOR ADMINISTRATION USE ONLY 33 % OF THE FISCAL YEAR HAS ELAPSED 05/15/2026 03:16PM PAGE: 4
690-53541-200-000 OTHER CONTRACTED SERVICES .00 .00 110.00 110.00 .00
690-53541-201-000 ELECTRIC/GAS 499.70 499.70 1,200.00 700.30 41.64
690-53541-202-000 WATER/SEWER/STORM 214.84 214.84 500.00 285.16 42.97
CONTRACTUAL SERVICES 714.54 714.54 1,810.00 1,095.46 39.48
690-53541-367-000 BOATHOUSE MAINTENANCE .00 .00 51,500.00 51,500.00 .00
SUPPLIES AND EXPENSE .00 .00 51,500.00 51,500.00 .00
714.54 714.54 53,310.00 52,595.46 1.34
690-55301-408-000 EVENT COSTS FOR MARINA .00 .00 2,000.00 2,000.00 .00
BUILDING MATERIALS .00 .00 2,000.00 2,000.00 .00
.00 .00 2,000.00 2,000.00 .00
690-59210-000-000 TRANSFER TO GENERAL FUND 4,166.67 16,666.67 50,000.00 33,333.33 33.33
PERSONNEL 4,166.67 16,666.67 50,000.00 33,333.33 33.33
4,166.67 16,666.67 50,000.00 33,333.33 33.33
TOTAL FUND EXPENDITURES 110,493.01 401,635.86 2,398,713.22 1,997,077.36 16.74
NET REVENUES OVER EXPENDITURES ( 19,117.37) 326,429.05 ( 428,165.22) ( 3,239,560.45) 76.24
37