Historic Preservation Committee — Agenda packet
Village of Ephraim · Door County · Historic Preservation Committee · meeting of Sep 22, 2026 · Agenda packets
Open the original document More from Village of Ephraim
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
VILLAGE OF EPHRAIM
FOUNDED 1853
HISTORIC PRESERVATION COMMITTEE AGENDA
Tuesday, September 22, 2026 – 6:30 pm
9996 Water Street
NOTE: This Meeting will be simultaneously held via teleconferencing. Staff, committee members
and the public are welcome to participate in this manner. Teleconferencing will be available by
computer, phone, tablet, or dial in. Connection information below:
1. Call to Order
2. Quorum
3. Changes in Agenda
4. Visitors’ Comments
5. Approve Previous HPC Minutes
6. Devin Wolf – 9815 Water St. – Addition – Design Review
7. John Maher –9992 Moravia St. – Garage & Remodel – Design Review
8. New Business for Next Meeting/Next Meeting Date
9. Adjournment
Please join my meeting from your computer, tablet or smartphone.
https://meet.goto.com/743831397
You can also dial in using your phone.
Access Code: 743-831-397
United States: +1 (646) 749-3122
* It is possible that a quorum of the Village Board or other Village Committees may be present at the meeting. However,
no action will be taken by the Board or any other committee unless specifically noticed.
Date: 9/18/2026
Andrea Collak, Clerk X Village Administrative Office
X Visitors’ Center
X Post Office
Kim Roberts, Deputy Clerk X Website www.ephraim.wi.gov
X Emailed to WDOR Radio
X Emailed to Peninsula Pulse
Administrative Office 10005 Norway Road PO Box 138 Ephraim WI 54211
Phone: (920) 854-5501 Fax: (920) 854-2072 E-Mail: office@ephraim.wi.gov
1
VILLAGE OF EPHRAIM
HISTORIC PRESERV ATION COMMITTEE
MEETING MINUTES
TUESDAY, JULY 28, 2026 – 6:30 PM
9996 WATER STREET
ACTION ITEMS:
Schreck moved, Ellis seconded to approve the March 31, 2026 Historic Preservation Committee minutes
as presented, all ayes with Thorp and Russell abstaining. Motion carried.
Shreck moved, Ellis seconded to approve the May 26, 2026 Historic Preservation Committee minutes as
presented, all ayes. Motion carried.
Schreck moved, Russell seconded to approve the landscape/land disturbance plan for Julia Uihlein at
10235 STH 42, all ayes. Motion carried.
Russell moved, Schreck seconded to approve the Accessory Structure Design Review Application for 9751
STH 42 for Pea Properties, all ayes. Motion carried.
Schreck moved, Russell seconded to approve the Addition Design Review Application for 9751 STH 42
for Pea Properties, all ayes, with Pentler nay. Motion carried.
Schreck moved, Ellis seconded to adjourn at 7:03 PM, all ayes. Motion carried.
Present: Marcia Ellis, Kathy Pentler (online), Amy Russell, Cody Schreck, and BD Thorp – Chair.
Absent: None.
Staff: Brent Bristol - Village Administrator and Kim Roberts - Deputy Clerk.
Guests in person: Steve and Mary Homa (Pea Properties, LLC), Nick Meissner (Meissner Landscape, Inc.),
Andy Bartelt, Ken Nelson, Monique McClean, Laird Hart, Rick Hoyerman, Ruann Larson, and Susie Samson.
Guests online: Doug Evans.
1. Call to order:
Thorp called the meeting to order at 6:15 PM.
2. Quorum:
A quorum of the Historic Preservation Committee was present.
3. Changes in agenda:
There were no changes to the agenda.
4. Visitors’ Comments:
There were no visitors’ comments.
5. Approval of previous minutes:
Schreck moved, Ellis seconded to approve the March 31, 2026 Historic Preservation Committee
minutes as presented, all ayes with Thorp and Russell abstaining. Motion carried.
Shreck moved, Ellis seconded to approve the May 26, 2026 Historic Preservation Committee
minutes as presented, all ayes. Motion carried.
6. Julia Uihlein – 10235 STH 42 – Landscape/Land Disturbance Plan:
Bristol provided background, noting that this is a nearly completed new home within the Historic District.
He explained that final landscape design had not been finalized during the original design review process,
which is common for large waterfront projects. Given the complexity of the landscape plan, he invited
Nick Meissner of Meissner Landscape, Inc. to present the materials and design details in person.
2
Meissner walked the Committee through the overall site plan, describing the general design philosophy as
one of naturalism — blending as seamlessly as possible with the surrounding landscape. Key elements of
the plan included the following:
The driveway will be asphalt for most of its length, transitioning approximately two-thirds of the way
down to a permeable cobblestone paver. The owners had selected a specific cobblestone option that day,
described as predominantly gray in a herringbone pattern, including a soldier course. A turf stone
application will differentiate where the driveway starts and stops near the garage. The entry walk will be
dry-set flagstone leading to the main entry, with a stepper path through a garden connecting to the
building between the house and garage.
Stormwater management was a central focus. All driveway water will be directed north along the property
line into a dry creek bed filled with clear gravel beneath to promote infiltration. A catch basin with piping
to the wetlands serves as a backup for heavy rain events.
On the north side of the house, a stone stepper pathway will run through a planting area and open to a
sodded lawn area with an 18” retaining wall to tuck the space into the landscape. An upper retaining wall,
approximately 21’’–22’’ above grade, will serve as a knee wall to border the lawn and provide safety.
Stone "seat stones" will protrude from the retaining wall as gathering spots. Steps on both the north and
south sides allow for circulation around the property. A boardwalk — similar in character to a prior
project at the same property — will traverse the wetland using galvanized steel pads that float on the
surface, leading to a waterside patio and dock.
On the south side of the house, stone stepper paths lead through a planting bed to a fenced dog run, which
will be primarily turf with foundation plantings. Meissner noted that the fence design for the dog run had
not yet been finalized, but he was exploring rustic options and planned to screen the generator with trees
or solid fencing, and the air conditioning units with a lower wood fence. He noted that these portions of
the project would be separate applications, once decisions were made.
Meissner also presented photographic samples of the materials proposed, including dry-set irregular
flagstone, split-face limestone retaining walls in an irregular bond pattern, "lily pad" steps with hand-
dressed edges meant to evoke a natural bedrock ledge, weathered stone steps near the shoreline, dry creek
bed materials referencing a neighboring property completed previously, and the chosen cobblestone
paver.
Bristol noted that impervious surface calculations had been submitted and that the project is approaching
approximately 20% impervious coverage, with the permeable paver options helping to address this. He
described the property as a large parcel being pushed close to its limits.
Committee members were broadly positive regarding the project. Ellis expressed support for the plan and
inquired about the boardwalk, asking about its length and construction method. Meissner estimated
approximately 40’-50’ across the existing wetland and clarified that the galvanized steel pads float on the
surface rather than being driven into the wetland. Russell praised the lily pad steps and the overall
hardscape design. Pentler asked whether the dog run fence extended to the property line (it does not) and
inquired about fence height, which Meissner indicated would comply with code and would be sufficient
to contain both small and large dogs. She also asked about the steep driveway grade, and Meissner
acknowledged it was very steep, noting there was limited ability to modify the slope without encroaching
on wetlands. Schreck had no negative notes and expressed appreciation for the level of thought put into
the design.
Schreck moved, Russell seconded to approve the landscape/land disturbance plan for Julia Uihlein
at 10235 STH 42, all ayes. Motion carried.
7. PEA Properties LLC -9751 STH 42 – Accessory Structure – Design Review:
Bristol introduced this item, noting that the footprint of the existing accessory structure, described by the
owner as a historic bunkhouse or "sugar shack," would not change, and that the enclosed space would be
3
slightly reduced. There were no setback issues identified. Property owners Steve and Mary Homa were
present for Pea Properties, LLC.
Steve Homa explained that the lower sloped roof section of the structure was in poor condition and would
be removed. He intends to extend the roof to the north to create covered space for wood storage and a
wood splitter, with a concrete slab poured underneath. The materials discussed included stained cedar
siding and a black standing seam metal roof. Steve indicated the 1:12 pitch section of the roof requires a
metal roof due to the low pitch being unsuitable for shingles, while the 4:12 pitch section faces the road
but is set well up the hill from it.
A discussion was held regarding the Accessory Structure Design Review Application for 9751 STH 42.
Pentler noted she had visited the property but could not locate the building. Homa confirmed it is situated
up the hill and to the right of the main house, well over 100’ from the road and not readily visible. Pentler
stated she did not prefer the black metal roof but acknowledged it was unlikely to be seen by anyone. She
also asked about the foundation, and Homa explained the structure currently sits on block and wood
framing. He explained that he has plans to lift it, pour a concrete slab beneath it, and add posts with gravel
or pavers around the perimeter.
Schreck stated he was in favor of the white or cedar siding treatment but not the black metal roof.
Pentler did not like the black metal roof as well.
Russell moved, Schreck seconded to approve the Accessory Structure Design Review Application
for 9751 STH 42 for Pea Properties, LLC, all ayes. Motion carried.
8. PEA Properties LLC -9751 STH 42 – Addition – Design Review:
Bristol explained that the proposed addition would be built over the northernmost portion of the existing
building, which currently serves as a garage. He noted that the elevation drawings may appear unusual
on first glance because the structure is built back into the hillside — appearing two stories from the front
and single story from the rear. He confirmed there were no dimensional or setback issues with the
project.
Steve Homa explained that the existing asphalt shingle roof is approximately twenty (20) or more years
old and would likely be replaced entirely in conjunction with the addition, using dimensional black
shingles throughout.
A discussion was held regarding the Addition Design Review Application for 9751 STH 42. Pentler said
she had visited the property and appreciated that the existing structure was being retained with a modest
modification. She approved of the black dimensional shingle roof over the metal option. Schreck noted
that the addition maintained a simple, rectilinear design, the windows matched the existing structure,
and the rear porch railing matched the existing railing already on the building. He expressed no
concerns. Thorp noted that a rendering appeared to show a blue or charcoal-colored foundation. Homa
confirmed the foundation was painted charcoal when purchased and was not proposed to change. Thorp
acknowledged the Plan Committee would make the final determination on that detail. A concern was
raised by Pentler regarding the black metal railing on the rear deck, noting that the Committee had
previously been strict about prohibiting black metal railings on other projects. Schreck acknowledged
the difficulty, pointing out that requiring a different railing on the addition would effectively be asking
the owners to change what already exists on the front of the home. Bristol clarified that there is no
formal prohibition on black metal railings in the code, noting it is more a matter of preference.
Schreck moved, Russell seconded to approve the Addition Design Review Application for 9751
STH 42 for Pea Properties, LLC, all ayes with Pentler nay. Motion carried.
9. Doug Evans – 9807 Brookside Lane – Additions –Concept Review:
Bristol introduced this item as a concept review, noting that the property off Brookside Lane consists of
three small historic cottages — all under 550 ft
2, with the smallest at approximately 260 ft2 that were
likely once part of a larger vacation rental complex. He noted the project may ultimately require variances
4
due to setback and other dimensional issues, and that the owner, Doug Evans, had requested a concept
review before HPC and the Planning Committee to gauge initial reaction before investing in full plans.
Doug Evans, participating remotely, explained that the primary driver of the project is overdue
maintenance. All three cottage roofs need replacement. He described his intent to raise the roofline on the
cottages by increasing the pitch from 4:12 to 7:12, which would allow him to add vaulted ceilings, create
loft spaces for bedroom use, and free up floor space in the very compact interiors, which currently have 7-
foot ceilings that feel cramped. He also noted that the steeper pitch and proposed steel roofing would help
shed tree debris, reducing the need for frequent roof maintenance given the heavily treed site. He
emphasized he was not looking to dramatically change the overall appearance of the cottages and sought
feedback before proceeding further.
A discussion was held about the concept review for 9807 Brookside Lane. Pentler said she had driven to
the property and found it interesting. She expressed appreciation for Evan's intent to maintain the existing
design character and raise the structures to improve functionality, and said she had no issues with the
concept. Ellis agreed it looked like a great improvement. Schreck raised a design concern, stating that the
renderings felt "a little too modern" to him. He observed that the proposed exterior treatment appeared to
switch from horizontal siding to a board-and-batten style, and that a more elaborate entrance featured in
one of the renderings had a "grand lodge" quality reminiscent of contemporary spec homes being built
elsewhere. He encouraged efforts to bring the design closer to the original cottage character. Thorp
echoed this sentiment, agreeing the design could look "a little bit more Ephraim-like."
Evans asked for clarification on whether the concern was with the exterior material choices rather than the
architectural lines, and Schreck confirmed that the rectilinear massing was being handled well, but that
some of the stylistic choices in the renderings leaned too contemporary.
Thorp noted that as this was a concept review, no formal recommendation to the Plan Committee would
be made.
10. New Business for next meeting / next meeting date:
No new business was noted.
The next meeting of the Historic Preservation Committee is August 25, 2026.
11. Adjournment:
Schreck moved, Ellis seconded to adjourn at 7:03 PM, all ayes. Motion carried.
Recorded by, Kim Roberts – Deputy Clerk
S:\EPHRAIM\Office Forms\Zoning\Forms\Building\BUILDING PERMIT APPLICATION.doc 1
P
lease Print
1.
Owner/Property Tax Parcel. No. __________-___________-_____________
Owner_____________________________________________
Mailing Address ____________________ City _________________________
State ___________________________________________ Zip __________________________
Phone(s) ______________________________________ Email _________________
Location of Project ______________________________ Nearest Cross Street _____________________
Property Use: ______________________________________________________________________
Zoning Area: ______________________ Historic District?
Yes No
C
ontractor/Contact: ____________________________Address ________
Phone(s) _________________________ Cell Phone
2. Type of Improvement
___ New Building A ccessory Structures
___
Addition ___ Garage
___ Exterior Alteration ___ Storage Building
___ Foundation Work Only ___ Repair/Replacement
___ Other ___________________ ___Other__________________
3. Describe Proposed Construction: __________________________________________
________________________________________________________________________
4. Cost
Total cost of improvements as applied for in permit: $________________
Structural Improvement Cost (if new building or addition, entire amount of structure; if alteration,
renovation or repair, structural portions only): $________________
In
clude with Application:
Certified Survey
Building plans, including all elevations, floor plans
(if commercial, State-approved plans must be given to the office prior to obtaining your permit)
Site plan showing lot dimensions, setbacks from all lot lines for structures
For commercial structures, parking plans
Parking plan for construction vehicles during construction phase
Permit Fee/Impact Fee Land Disturbance Application
Drainage Plan Landscape Plan
VILLAGE OF EPHRAIM
BUILDING
/ZONING PERMIT APPLICATION
1 of 2
Application Date
______________
X
X Interior Remodel
Interior remodel consisting of bathroom additions and Window and Door
replacement. Exterior: Addition of a detached 25x25 garage.
John J Maher
Madison
Wisconsin 53711
9992 Moravia St Church St
Residential Home
R1 Single-Family Residential
Jason Reinhardt
x
X
X
121240024B
08/31/2026
150,000
110,000
S:\EPHRAIM\Office Forms\Zoning\Forms\Building\BUILDING PERMIT APPLICATION.doc 2
Dimensions: Number of Stories: ____________ Height at Peak: _______________________
Roof Pitch(es): _____________________ Total Footprint, Exterior: _______________
T
otal Square Footage, All Floors Exterior: ________________
Total Square Footage, Parking/Drives/Walkways: ______________________________
Type: Wood Frame Structural Steel Reinforced Concrete Other___________________
Principal Heating: ___ Propane ___ Oil ___ Electric
___ Other
(Explain)_____________________________________________
Plant Manager
Signature__________________________Date__________
Sewage Disposal:
Current: Proposed :
None Current System Continued Demolition/Moving ?
Sewered Connect to Available Sewer
Septic Extend Sewer to Property
Mound/In-Ground On-Site System
Other ___________________ Type: ____________________________________________
(copy of permit to be on file with Village)
Year Installed: ____________ If On-Site System, Year Last Pumped/Inspected: _________
For sewage disposal planning, your contact is the Ephraim Treatment Plant Manager, 920/854-4991.
Please contact him as soon as possible to allow proper planning and discussion of any necessary sewer
connection permits or fees involved.
Fire Chief Signature _________________________Date____________
Fire Department: Sprinklers needed? /box3 Yes /box3 No
Driveway width/tree clearance (width/height): _______________________
Clearance around structures for truck access: ________________________ Fire # Assigned __________
Fire Department requires driveways at least 12’ wide and clearance 12’ high; Fire Chief may be in
contact with you during construction to check truck access and, if commercial structure, any
sprinklering, water sources, or other safety considerations
Application and materials must be in the Village offices one week prior
to Plan Committee meeting date
to allow for proper processing and notification of Committee members. When permits are issued, work
must start within 6 months and be completed within one year. The owner of this property and the
undersigned agree to conform to all applicable laws of the State of Wisconsin and the Village of Ephraim.
Signature of Applicant___________________________ Print Name _____________________________
F
OR OFFICE USE ONLY
For New Buildings or Additions, Complete this Section Also:
Permit #_____________________________ Permit Fee: $_________________________________
Date Permit Issued ___________ Zoning Administrator Signature:_________________________________
Restrictions: _____________________________________________________________________________
2 of 2
1
25x255/12
625 SQFT
X
X
16'
Jason C Reinhardt
reinhardt@deleers.com
Village of Ephraim Historic District Design Review Checklist
THIS FORM MUST BE COMPLETELY FILLED OUT TO BE CONSIDERED BY HPC AND/OR THE PLAN COMMITTEE.
This checklist reflects the identified standards of design review for new construction in the Village of Ephraim. Under each
subsection, please briefly describe the construction plans as they apply to each. The more detail, the better. Some of these standards
will be identified visually on the construction plans, but we do ask that you describe them herein and provide any additional
information, such as drawings and/or plans, that will help streamline the process. The standards can be found in §17.15(13) ( Design
Review), §17.26(11) (Historic District), and §17.20 (Protected Waterfront).
Material and color samples must be provided as well as photos of the existing structure for evaluation by the
Historic Preservation Committee for referral to the Plan Committee.
1 OWNER INFORMATION: * Please provide a mailing address where you can receive mail.
Owner Name: John Maher
Owner Street Address :
Zip: 53711
Phone #1: Phone #2:
Email: j
2 PROPERTY INFORMATION:
Property Address (Please list all applicable fire
numbers): 9992 Moravia St
3 STRUCTURE FORM / BUILDING DESIGN
Please describe the architecture of the building/ building design. Ordinance narrative: Ephraim is known for its traditional architecture, simple
rectangular forms, gable and hip roofs, and frame construction. (If additional space is required, please use the back of page 4)
We plan to match the design, style and color of the existing structure.
4 SITE & DEVELOPMENT PLANNING
Please describe the site plan. Ordinance narrative: Please refer to §17.15 and the table of standards. Ensure that the layout adheres to zoning
setbacks and zoning code. (If additional space is required, please use the back of page 4)
5 ARCHITECTURAL DETAILS
Please describe the architectural details including such items as window and door shapes. Ordinance narrative: Architectural details should
reflect the traditional architecture of the Village which is known for its simple rectangular building forms, gable & hip roofs, and frame construction.
Simplicity is the keyword. (If additional space is required, please use the back of page 4)
Rectangle windows and doors.
6 COLORS/MATERIALS
Please describe the color and materials for the following characteristics of the project design. Ordinance narrative: White is the distinctive historic color of the
Village. Wood and natural stone are recommended. Unfinished or galvanized metal siding or roofing is discouraged. To achieve unity, there are distinguishing colors
that are appropriate and compatible for the Historic District, which include white, naturally weathered wood, or natural wood. Fluorescent and bright colors are
prohibited. Wrought iron is not an acceptable material in the Historic District.
Structure(s): Color: Material:
Building(s): Color: Material:
Siding: (Please note vertical or
horizontal) Color: Brown Material: Horizontal Cedar
Roof: Color: Match house Material: Asphalt
Trim: Color: Match house Material: Wood
Sash: Color: Material:
Chimney: Color: Material:
Window Frames: Color: White Material: Aluminum
Window: Color: Material:
Door Frames: Color: White Material: Aluminum
Doors: Color: White Material: Aluminum or steel
Shutters: Color: Material:
Fences: Color: Material:
Gates: Color: Material:
Porch Trim: Color: Material:
Handrails: Color: Brown Material: Composite
Guardrails: Color: Material:
Driveway: Color: Material:
Sidewalk: Color: Material:
Patio/Deck: Color: Material:
Other
Architectural/
Ornamental
Features (describe
and detail color and
materials):
Color(s):
Material(s):
7 UTILITY WIRING (Location)
Please describe and show all utility service wiring on the plot plan. Ordinance narrative : Utility service wiring should be brought to a structure underground, if at
all possible. (If additional space is required, please use the back of page 4)
We will installing a new exterior panel to the back side of the house and running the wire underground to
supply power to the new garage and garage panel.
8 ROOF PITCH
Please describe the roof design. Ordinance narrative : Pitches less than 3/12 and/or 12/12 are subject to further design review. In the Historic
District, tar and gravel roofs are not compatible. Unfinished or galvanized metal siding or roofing is highly discouraged in all zoning districts, but a
metal roof requires a conditional use in the Historic District. In the Protected Waterfront District, primary roof pitches less than 6/12 or more than
12/12 are prohibited. Additionally, in the PW, up to 50% of the total roof pitch can be made up of dormers that may be less than 6/12 but in no
case may they be less than 3/12. (If additional space is required, please use the back of page 4)
Gable roof with a 5/12 pitch.
9 CHIMNEY
Please describe in detail the chimney, along with all venting and exhaust flues, along with their height. Ordinance narrative: In the Protected
Waterfront District, nothing can penetrate above 25 feet in height (including all venting and exhaust flues), with the roof line not exceeding 23 feet.
In all other districts, chimneys are allowed up to a maximum of 35 feet from grade.
10 SIZE AND LAYOUT OF STRUCTURE
Please explain project plans for square footage and floor area, as well as plans for variations in material or lines to create diversity.
Ordinance narrative : Any structure in any district that is proposed, by way of initial construction or successive additions, to have in excess of 5,000
square feet in floor area or 50,000 cubic feet in bulk requires special attention to avoid overbuilding of a site or overpowering the environs where
prevailing structural sizes are smaller. No single building face of 50 feet or more in length shall be uninterrupted. (If additional space is required,
please use the back of page 4)
The project is a 25' x 25' garage equaling 625 SQFT
11 DRIVEWAY, SIDEWALK(s), & PATIO (OR DECK)
Please describe and provide plans for driveways, sidewalks, patios, and decks. Ordinance narrative : Native flagstone is an excellent substitute
for concrete and asphalt in pedestrian areas. Where paving is used, it shall be kept to a minimum and buffered with landscaping when possible. (If
additional space is required, please use the back of page 4)
At this time we are planning to use the existing driveway.
12 LANDSCAPING PLANS / FENCES
Please describe and provide the landscaping plans, noting details such as hardscape and softscape. Ordinance narrative : Plantings rather
than large expanses of grass lawn are to be encouraged, and live native plants should be used. Recognizing that the open shoreline is one of
Ephraim’s most distinctive features, the intent of this ordinance is to provide for as much open viewing space along our shoreline as possible in the
PW district. (If additional space is required, please use the back of page 4)
Landscaping will remain the same and unchanged as much as possible.
13 ADDITIONAL FEATURES
14 SIGNATURE
Signature of Applicant:
Date:
09/18/2026
Internal Use Only
Date Received:
Complete Application Color and Material Samples Provided □Yes □No
Existing Structure Photos Provided □Yes □No
15 ADDITIONAL SPACE
John Maher
9992 Moravia St
x
30' x 30'
Build detached garage
Ephraim Foundation INC
x
x
10/15/2026
04/30/2026
09/18/2026
UP
DN
UP
U.C.
Refr.
DN
KITCHEN
101
FAMILY ROOM
105
DINING
104
STORAGE
102
LINEN
SLOPED
CLG
SLOPED CLG
HALL
204
BATH
203
STAIR
200
BEDROOM
201
BEDROOM
202
PRIMARY BEDROOM
205
P. BATH
206
LINEN
FLAT ROOF
8-3/4" STEP UP
KITCHEN
101
FAMILY ROOM
105
DINING
104
NEW
LDRY/POWDER
107NEW WET BAR
106
LINEN
7' - 2 1/2" 8' - 3 1/4"
9' - 6 3/4"
SUBZERO UNDER
COUNTER DRAWER
PULL-OUT
CABINET STORAGE
2' - 1"
CAB.CAB.
ICE
MAKER
REPLACE WINDOW
REPLACE WINDOW
3 1/2"
5' - 10 3/4"
3 1/2"
3' - 1"
HALL
204
BATH
203
STAIR
200
BEDROOM
201
BEDROOM
202
PRIMARY BEDROOM
205
FLAT ROOF
8-3/4" STEP UP
P. BATH
206
SHOWER
209
2' - 0 1/2"
3 1/2"
3' - 6"5' - 6" 3' - 0"
5' - 5 1/4"
4' - 4"
3' - 10"
3 1/2"
3' - 7"
3 1/2"
2' - 1"
12' - 7 1/4"
NICHE
NICHE
RMC
RECESSED MED. CAB.
REPLACE WINDOW
WALL KEY
2x6 WOOD STUD WALL
2x4 WOOD STUD WALL
BEARING 2x4 WOOD STUD WALL
2x2 WOOD STUD WALL
DEMOLISHED WALL
DATE:
SHEET:
DESIGN NO:
DRAWN BY:
DESIGNER:
"COPYRIGHT NOTICE"
© DeLeers Construction, Inc. 2024/ Jeremy Lueck. - All
specifications, plans, designs and documents created
under this agreement are copyright protected and may
not be sold, traded, transferred altered to or by any other
party other than the owner, without the express written
consent of the Designer and DeLeers Construction, Inc.
B.D.A.: PRE-CONTRACT
UPDATES:
BID SET A1.1
9.2.26 9992 Moravia St, Ephraim, WI 54211
Maher ResidenceBD25-12-09
Lucas Rentmeester
...
Brian Rosner
1.16.26
6.1.26
8.12.26
9.2.26 BID SET
...
...
REMODEL PLANS
1/4" = 1'-0"A1.1
1 EXISTING/DEMO FIRST FLOOR PLAN
1/4" = 1'-0"A1.1
2 EXISTING/DEMO SECOND FLOOR PLAN
1/4" = 1'-0"A1.1
3 REMODELED FIRST FLOOR PLAN
1/4" = 1'-0"A1.1
4 REMODELED SECOND FLOOR PLAN
CONSTRUCTION SET REVISIONS
Refrigerator
FD
FD
FD
FD
WALL BRACING INFORMATION:
CONTINUOUS BRACING USED
25'-0" X 25'-0" RECTANGLE
EAVE TO RIDGE: 6'-0"
WALL HEIGHT: 9'-4 1/2"
EXTERIOR STUD SPACING: 16" O.C.
WIND SPEED: 90 (ASCE 7-05)
SEIDMIC DESIGN B
HOUSE MINIMUM PANEL LENGTH: 48"
18" MINIMUM PANEL LENGTH IN PORTAL FRAMED WALLS
4.75' OF WALL BRACING REQUIRED ON FRONT AND REAR WALLS
4.75' OF WALL BRACING REQUIRED ON LEFT AND RIGHT WALLS
WALL KEY
2x6 WOOD STUD WALL
2x4 WOOD STUD WALL
BEARING 2x4 WOOD STUD WALL
2x2 WOOD STUD WALL
DEMOLISHED WALL
•
•
•
GENERAL NOTE:
ALL DIMENSIONS ARE TO FACE OF STUD.
HEADER HEIGHTS NOTES:
VERIFY FLOORING THICKNESS TO SET DOOR AND
WINDOW HEADERS. SHIMMING MAY BE REQUIRED
UNDER DOOR UNIT FOR THICKER FLOORS.
VERIFY IF WINDOW HEADERS SHOULD MATCH
ENTRY/PATIO DOOR HEADER HEIGHTS.
1.
2.
DOOR SCHEDULE NOTES:
SEE DOOR ORDER FOR ROUGH OPENINGS.
SEE SELECTION SHEET FOR STYLE OF DOOR.
4
A1.2
5" / 12"5" / 12"
2' - 0"
5 1/2"
24' - 0"
5 1/2"
2' - 0"
2' - 0"
5 1/2"
24' - 0"
5 1/2"
2' - 0"
DETACHED GARAGE
001
STORAGE
002
4' - 6" 7' - 4" 7' - 4" 5' - 9"
12' - 5 1/2" 12' - 5 1/2"
24' - 11"
24' - 11"
5 1/2"
6' - 1 1/2" 17' - 10 1/2" 5 1/2"
4
A1.2
(2) 11 7/8" LVL
002.1
001.1
6' - 8"
CS-WSP
4' - 0" 2' - 8"
CS-WSP
4' - 0" 7' - 7"
CS-WSP
3' - 5 1/2"18' - 0"
CS-WSP
3' - 5 1/2"
EXISTING WELL
5 1/2"
9' - 0" 14' - 10"
8"
16' - 11 1/2" 8' - 0"LANDSCAPE
RETAINING WALL
(BY LANDSCAPE
TRADE PARTNER)
WOOD
STORAGE
AREA
4
A1.2
1/8" / 12"
1/4" / 12"
1/8" / 12"
1/4" / 12"
25' - 0"
8' - 0"17' - 0"
25' - 0"
25' - 0"
1/4" / 12"1/4" / 12"
1/8" / 12"
1/8" / 12"
8" THICK X 6'-0" HIGH POURED
CONCRETE FOUNDATION W/
(2) #4 BARS TOP & BOTTOM ON
16" X 8" CONCRETE FOOTING W/
(2) #4 BARS CONT.
4" CONCRETE FLOOR SLAB
W/ #4 BAR 2' O.C. EACH WAY
12"X12" THICKENED EDGE SLAB
W/ (2) #4 REBAR CONTINUOUS
9' - 4 1/2" 8"
2' - 0"2' - 0"
002.1
DETACHED GARAGE
001
STORAGE
002
ROOF TRUSSES BY MFR.
SIDING
BUILDING WRAP OVER
7/16" OSB SHEATHING 2X6 STUDS @16" O.C.
4" CONCRETE SLAB OVER
COMPACTED STONE
ALUMINUM VENTED SOFFIT
ALUMINUM FASCIA
2X6 SUB FASCIA
MIN. 1/2" DIA. ANCHOR BOLTS
PER SPS 321.18(1)(C)3
2X6 TREATED MUD
SILL W/ SILL SEAL
CONTINUOUS RIDGE VENT - TYP.
THICKENED EDGE SLAB W/
(2) #4 REBAR CONTINUOUS
ASPHALT SHINGLES ON WARRANTED
ROOFING UNDERLAYMENT SYSTEM
(BY ROOFING TRADE PARTNER) PER
MFR. SPECS. ON 5/8" OSB SHEATHING
GRADE
ICE & WATER SHIELD TO INSIDE
OF THE EXTERIOR WALL, ONE
ROW IN VALLEYS - TYP.
8" 7' - 0" 2' - 8 1/2" 8"
5"
12"
5"
12"
1.
2.
CONCRETE PITCH GENERAL REQUIEMENTS:
1/8" PER FOOT MIN. TO 1/4" PER FOOT MAX.
PITCH TO FLOOR DRAINS
WALL BREAK & CENTER BREAKS AS REQUIRED
WATERPROOF LAPPING NOTE:
*** PROPERLY LAPPING HOUSE WRAP & FLASHING
IS CRITICAL TO CREATING A WATERPROOF
BARRIER, FOLLOWING A "SHINGLE-LAP" METHOD
WHERE HIGHER PIECES OVERLAP LOWER ONES.
DATE:
SHEET:
DESIGN NO:
DRAWN BY:
DESIGNER:
"COPYRIGHT NOTICE"
© DeLeers Construction, Inc. 2024/ Jeremy Lueck. - All
specifications, plans, designs and documents created
under this agreement are copyright protected and may
not be sold, traded, transferred altered to or by any other
party other than the owner, without the express written
consent of the Designer and DeLeers Construction, Inc.
B.D.A.: PRE-CONTRACT
UPDATES:
BID SET A1.2
9.2.26 9992 Moravia St, Ephraim, WI 54211
Maher ResidenceBD25-12-09
Lucas Rentmeester
...
Brian Rosner
1.16.26
6.1.26
8.12.26
9.2.26 BID SET
...
...
DETACHED GARAGE PLANS
DOOR SCHEDULE
DOOR NO. WIDTH HEIGHT JAMB COMMENTS
001.1 18' - 0" 8' - 0" 6 9/16" OVERHEAD DOOR
002.1 2' - 8" 6' - 8" 6 9/16" ENTRY DOOR
1/4" = 1'-0"A1.2
1 DETACHED GARAGE ROOF PLAN
1/4" = 1'-0"A1.2
2 DETACHED GARAGE FLOOR PLAN
1/4" = 1'-0"A1.2
3 DETACHED GARAGE FOUNDATION PLAN
1/2" = 1'-0"A1.2
4 DETACHED GARAGE SECTION
CONSTRUCTION SET REVISIONS
DATE:
SHEET:
DESIGN NO:
DRAWN BY:
DESIGNER:
"COPYRIGHT NOTICE"
© DeLeers Construction, Inc. 2024/ Jeremy Lueck. - All
specifications, plans, designs and documents created
under this agreement are copyright protected and may
not be sold, traded, transferred altered to or by any other
party other than the owner, without the express written
consent of the Designer and DeLeers Construction, Inc.
B.D.A.: PRE-CONTRACT
UPDATES:
BID SET A2.1
9.2.26 9992 Moravia St, Ephraim, WI 54211
Maher ResidenceBD25-12-09
Lucas Rentmeester
...
Brian Rosner
1.16.26
6.1.26
8.12.26
9.2.26 BID SET
...
...
EXTERIOR ELEVATIONS
CONSTRUCTION SET REVISIONS
1/4" = 1'-0"A2.1
1 WEST ELEVATION
1/4" = 1'-0"A2.1
2 SOUTH ELEVATION
1/4" = 1'-0"A2.1
3 GARAGE WEST ELEVATION
DATE:
SHEET:
DESIGN NO:
DRAWN BY:
DESIGNER:
"COPYRIGHT NOTICE"
© DeLeers Construction, Inc. 2024/ Jeremy Lueck. - All
specifications, plans, designs and documents created
under this agreement are copyright protected and may
not be sold, traded, transferred altered to or by any other
party other than the owner, without the express written
consent of the Designer and DeLeers Construction, Inc.
B.D.A.: PRE-CONTRACT
UPDATES:
BID SET A2.2
9.2.26 9992 Moravia St, Ephraim, WI 54211
Maher ResidenceBD25-12-09
Lucas Rentmeester
...
Brian Rosner
1.16.26
6.1.26
8.12.26
9.2.26 BID SET
...
...
EXTERIOR ELEVATIONS
CONSTRUCTION SET REVISIONS
1/4" = 1'-0"A2.2
1 EAST ELEVATION
1/4" = 1'-0"A2.2
2 NORTH ELEVATION
DATE:
SHEET:
DESIGN NO:
DRAWN BY:
DESIGNER:
"COPYRIGHT NOTICE"
© DeLeers Construction, Inc. 2024/ Jeremy Lueck. - All
specifications, plans, designs and documents created
under this agreement are copyright protected and may
not be sold, traded, transferred altered to or by any other
party other than the owner, without the express written
consent of the Designer and DeLeers Construction, Inc.
B.D.A.: PRE-CONTRACT
UPDATES:
BID SET A9.1
9.2.26 9992 Moravia St, Ephraim, WI 54211
Maher ResidenceBD25-12-09
Lucas Rentmeester
...
Brian Rosner
1.16.26
6.1.26
8.12.26
9.2.26 BID SET
...
...
3D VIEWS
A9.1
1 FIRST FLOOR 1
A9.1
2 SECOND FLOOR 1
CONSTRUCTION SET REVISIONS
A9.1
3 EXTERIOR SW
A9.1
4 EXTERIOR NE
NEW 25'X25'
DETACHED
GARAGE
89° 36' 05"
215.48'
N E
15° 59' 50"141.26'
S W
LANDSCAPE RETAINING
WALL (BY LANDSCAPE
TRADE PARTNER)
DATE:
SHEET:
DESIGN NO:
DRAWN BY:
DESIGNER:
"COPYRIGHT NOTICE"
© DeLeers Construction, Inc. 2024/ Jeremy Lueck. - All
specifications, plans, designs and documents created
under this agreement are copyright protected and may
not be sold, traded, transferred altered to or by any other
party other than the owner, without the express written
consent of the Designer and DeLeers Construction, Inc.
B.D.A.: PRE-CONTRACT
UPDATES:
BID SET C1.1
9.2.26 9992 Moravia St, Ephraim, WI 54211
Maher ResidenceBD25-12-09
Lucas Rentmeester
...
Brian Rosner
1.16.26
6.1.26
8.12.26
9.2.26 BID SET
...
...
SITE PLAN
1" = 20'-0"C1.1
1 SITE PLAN
CONSTRUCTION SET REVISIONS
Source: Village of Ephraim website. First collected Oct 10, 2026.