Physical Facilities & Utilities Committee — Agenda packet
Village of Ephraim · Door County · Physical Facilities & Utilities Committee · meeting of Aug 4, 2026 · Agenda packets
Open the original document More from Village of Ephraim
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
VILLAGE OF EPHRAIM
FOUNDED 1853
VILLAGE OF EPHRAIM
FOUNDED 1853
Physical Facilities/Utilities Agenda
Tuesday, August 4, 2026, 8:00 AM
Village Hall 9996 Water Street
NOTE: This Meeting of the Village Physical Facilities/Utilities Committee will also be held via
teleconferencing. It will be available to the public to attend in person or by computer, phone,
tablet, or dial in. Connection information is included below in this notice.
1. Call to order
2. Changes in Agenda
3. Previous minutes – June 3, 2026
4. Visitors’ comments
5. Maintenance Manager Report
6. Discussion and Recommendation on Placement & Number of Trees on North End Path
7. Discussion and Recommendation on Placement of Solar Bollards on North End Path
8. Discussion and Recommendation on Tree for Southend of Marina
9. New business for next meeting
10. Adjournment
Please join my meeting from your computer, tablet or smartphone.
https://meet.goto.com/635391461
You can also dial in using your phone.
Access Code: 635-391-461
United States: +1 (224) 501-3412
*It is possible that a quorum of the Village Board or other Village Committees may be present at the
meeting. However, no action will be taken by any other Board or Committee unless specifically noticed.
Date 7 / 31 /202 6
X Village Administrative Office
X Visitors’ Center
X Post Office
X Website: ephraim.wi.gov
X Emailed to WDOR/ Peninsula Pulse
Andrea Collak, Clerk
Kim Roberts, Deputy Clerk
1
VILLAGE OF EPHRAIM
PHYSICAL FACILITIES & UTILITIES MINUTES
WEDNESDAY, JUNE 3, 2026, 10:00 AM
9996 WATER STREET
Action Items:
Flottman moved, Reinhardt seconded to approve the minutes of May 5, 2026, all ayes. Motion carried.
Flottman moved, Reinhardt seconded to recommend to the Village Board approval of planting a
Princeton Elm Tree as the Village’s Liberty Tree to celebrate the 250th anniversary of the United States,
with a dedication plaque mounted on native limestone at Harborside Park, all ayes. Motion carried.
Flottman moved, Reinhardt seconded to recommend to the Village Board to create language addressing
non-profit requests to rent the Village Hall that are not local to Ephraim. Only non-profits, located
within the Village of Ephraim, shall be exempt from Village Hall rental fees, all ayes. Motion carried.
Flottman moved, Reinhardt seconded to undertake snow removal on the North End Path, all ayes.
Motion carried.
Flottman moved, Reinhardt seconded to recommend to the Village Board to concentrate more time and
effort on options #2 and #4 for the Administration Building Plans, both in scope, size, and potentially
location for option #4 if required, all ayes. Motion carried.
Flottman moved to adjourn at 11:06 AM, Reinhardt seconded, all ayes. Motion carried.
Present: Paul Flottman, Brian Reinhardt, and Matt Meacham – Chair.
Absent: Scott Lohman.
Staff: Brent Bristol – Village Administrator, Justin MacDonald – Maintenance Manager/Fire Chief, and Kim
Roberts - Deputy Clerk.
Guests online: Lane Methner (EBC), Jane Larson, and Ken Nelson.
Guests in person: Carly Mulliken and Sarah Martin.
1. Call to Order: Meacham called the meeting to order at 8:00 AM.
2. Quorum: A quorum was present for this meeting.
3. Changes in Agenda: There were none.
4. Approval of Previous Minutes:
Flottman moved, Reinhardt seconded to approve the minutes of May 5, 2026, all ayes. Motion
carried.
5. Visitors’ Comments: There were none.
6. Maintenance Manager Report:
MacDonald provided an overview of the activities the Maintenance Department completed in May:
• Outdoor work for the season commenced, including opening bathrooms, placing garbage cans,
flower planting, hanging flags, and mowing operations.
• The 2026 paving projects were coordinated with the Door County Highway Department, slated to
begin in June.
• The launch dock was installed at the marina.
• Five (5) year well inspections were completed by the WI DNR.
• Interviews were conducted for the vacant maintenance position.
• Stumps were cut down to as close to grade as possible on Moravia Point to prep the site for future
work.
• Placement of no-parking signs and pedestrian signs for the season.
2
• Attended Fyr Bal emergency planning meeting.
• Final preparation for the brush and yard site was completed, including signage and two (2) loads of
gravel.
• Six (6) new fire signs were installed.
7. Discussion and consideration of Liberty Tree:
Meacham provided an informational update on the Liberty Tree project, noting that the task force
consisting of Cody Shreck, Carly Mulliken, and himself had reached a consensus. They are
recommending a Princeton elm tree to be planted at Harborside Park, near where another tree had come
down. Harborside Park was selected as the most suitable location for a substantial-sized tree.
A discussion was held regarding the Liberty Tree. Mulliken explained that the task force agreed on
using native Door County limestone to mount the plaque, with a local masonry contractor donating the
stone. While the plaque will be mounted on the native limestone, it can be moved as the tree grows
larger. The 4” tree will be sourced from Hortonville, Wisconsin and is a species that is resistant to elm
disease. Bristol noted that equipment and digging will be coordinated between the vendor and
MacDonald.
Flottman moved, Reinhardt seconded to recommend to the Village Board approval of planting a
Princeton Elm Tree as the Village’s Liberty Tree to celebrate the 250
th anniversary of the United
States, with a dedication plaque mounted on native limestone at Harborside Park, all ayes. Motion
carried.
8. Update on Village Dump Hours of Operation:
Meacham initiated a discussion about dump hours of operation due to concerns raised at the last Board
meeting regarding unauthorized dumping. While there was consideration of restricting hours, many
residents use the dump on weekends, and unauthorized dumping has occurred even after hours.
The discussion evolved toward installing security cameras on visible red poles, so users know they are
being monitored, along with additional signage. MacDonald reported significant unauthorized dumping,
including wood chips, topsoil, and tree trunks, which are not acceptable materials. A Mass email
notification has been sent to residents about proper usage. MacDonald noted that many other municipal
dump sites control their hours, typically operating only during set times or specific days. He suggested
that if abuse continues, the Village may need to restrict contractor access or implement limited hours.
Committee members discussed that the volume of material suggests usage beyond what Ephraim
residents alone would generate. The Committee agreed to start with camera installation and improved
signage as first steps, with enforcement likely having a deterrent effect once word spreads. MacDonald
will report back on the effectiveness of these measures.
9. Discussion on rental of the Village Hall:
The discussion arose because of the amount of time the maintenance crew spends breaking down and
setting up the Village Hall before and after nonprofit events. Currently, nonprofits are not charged rental
fees, and there is only one paying event for 2026. Meacham proposed that if nonprofits leave the hall in
the same condition they found it, no fee should be charged. However, if additional cleanup is required,
an $85 fee would be assessed. Mulliken noted that local nonprofits like EBC and EHF would find
regular fees detrimental to their programming. Bristol explained that the current situation differs from
pre-COVID, when the hall sat empty year-round, versus now, when it's regularly used for meetings.
Flottman moved, Reinhardt seconded to recommend to the Village Board to create language
addressing non-profit requests to rent the Village Hall that are not local to Ephraim. Only non-
profits, located within the Village of Ephraim, shall be exempt from Village Hall rental fees, all
ayes. Motion carried.
10. Discussion and recommendation on snow removal and other items related to the North End
Walking Path:
3
Meacham noted that as a north end business person, there's limited winter activity, though there are now
two established year-round businesses with a third coming soon. He questioned whether to provide snow
removal services for the new walking path, similar to downtown sidewalk maintenance.
A discussion was held regarding snow removal on the North End Path. MacDonald confirmed they
currently clear downtown sidewalks but not the shorefront walkway. He indicated that snow removal
would be done with a snowblower, similar to downtown operations, though timing would depend on
how the path interfaces with highway snow removal. Flottman recommended planning to clear the path
initially, noting that usage patterns could be evaluated after the first winter season. Bristol confirmed
they wouldn't know the actual time and resource requirements until they attempt it, noting that the first
portion near the curve would be similar to downtown clearing, while the farther section might be more
challenging. The Committee agreed to try snow removal for the first season to evaluate feasibility and
usage patterns.
Flottman moved, Reinhardt seconded to undertake snow removal on the North End Path, all ayes.
Motion carried.
11. Discussion and recommendation regarding Administration Building Plans:
Meacham presented four options for the administration building, noting that option #2 (approximately
$1.6 million) was preferred by office staff, while option #4 represented a completely new facility for
roughly $2 million. He argued from a financial standpoint that spending $1.8 million to renovate the
existing building with an antiquated basement and old plumbing doesn't make financial sense when a
new building could be built for only $200,000 more.
A discussion was held regarding the Administration Building Plans. Mulliken clarified that option #4
pricing doesn't include teardown costs or potential land purchase if the building were to be built
elsewhere, and wouldn't include ongoing and required maintenance of the existing building if it
remained standing. Jane Larson commented that option #4's costs are incomplete without teardown
expenses and urged consideration of neighborhood impacts, expressing support for option 2 as a
taxpayer. Bristol explained the reasoning, noting that while option #4 might be best over 40-50 years,
option #2 was recommended as most likely to move forward while addressing staff needs and respecting
the building's community significance.
Committee members discussed the building's history as a 1948 schoolhouse and its role in the
community. Bristol explained the Administration Building was next on the Capital Project list after
Anderson Dock, North End path, Maintenance Garage, and Fire Station projects. He stressed that Option
#0 is the starting point; it is not an option to do nothing with $0 expense. The Committee explored
basement accessibility issues, noting that none of the current options make it ADA accessible; an
elevator addition is estimated at $400,000. Meacham maintained that option #4 makes more financial
sense despite architectural considerations. Flottman noted the challenge of balancing historical
preservation with practical needs and future growth requirements. He pointed out that the building was
not serving the needs of the employees or the community. Various Committee members expressed
concerns about being constrained by the current property's limitations versus building new, while others
emphasized the importance of community sentiment and the building's local significance. After
extensive discussion of the pros and cons of both approaches, the Committee focused on options 2 and 4
as the most viable paths forward.
Flottman moved, Reinhardt seconded to recommend to the Village Board to concentrate more
time and effort on options #2 and #4 for the Administration Building Plans, both in scope, size,
and potentially location for option #4 if required, all ayes. Motion carried.
12. New Business for the next meeting: No new business was discussed.
13. Adjournment:
Flottman moved to adjourn at 11:06 AM, Reinhardt seconded, all ayes. Motion carried.
Recorded by, Kim Roberts – Deputy Clerk
Village of Ephraim Physical Facilities/Utilities
July Maintenance Manager Report
Work done in July:
• Daily Tasks (Bathroom Cleaning, Garbage collection, Flower Watering, Litter Pick-up)
• Lawn Watering and Mowing as needed
• Cleaning of Administration Building, Village Hall and Library.
• Set-up and Take Down Village Hall as needed for events
• Tilling of Beach as needed
• Push up dump as needed
• Moved all Recycling to Fire Station Parking lot for Paving Operations
• Door County Highway Paved Spruce Ln., Holand Rd., N. Orchard Rd. and
Maintenance/Wastewater Facilities.
• Painted pedestrian signage on North Walking Path
• Quarterly Water Testing
• Painting of Trim at Administration Office
• String Trim Moravia Point Guardrail from CTY Q to Water St.
• Leveled 2 loads of Gravel at dump due to water ponding issue
• Mowed Old Dump as required by DNR
• Mowed Wastewater Access on Stock Ln, ditches on several roads
• Installed multiple fire numbers
• Replaced several burned out bulbs in old streetlights
• Repainted trim on gazebo border
• Patched potholes on several streets
• Installed Rock/Plaque at Liberty Tree
• Spraying of Weeds at various locations
• Removed 2 Dead Deer that were on Village Right of Ways
• Repaired several toilets that had issues.
Respectfully Submitted
Justin MacDonald
Maintenance Manager
jmacdonald@ephraim.wi,gov
North Path Tree Proposal
Tom Wolfe
Wolfe Horticulture LLC
• Starting at the east end the Old Sled Dog property 130 ft
- 5 Crabapples
o 3 Royal Raindrops, blooms deep red - 7 ft multi stemmed persistent red fruit
all winter 15 ft height, 12 ft spread
o 2 Adirondack Crabapples, blooms white -2 in dia. persistent orange fruit 15-
20 ft height, 20 ft spread
• Front of Green Gables and Universal Unitarians 230 ft
- 11 Catalpa Trees 25 gal White Flower Yellow Autumn Color 40-50 ft height, 20 ft
spread
• Front of 106-9 lodge/resale shop 100 ft.
- 3 Sienna Glenn Maple 2 in dia., 40 ft height, 25 ft spread
• Front of George Burr Gallery 100 ft
- 3 Crabapples
o 2 Royal Raindrops, blooms deep red - 7 ft multi stemmed persistent red fruit
all winter 15 ft height, 12 ft spread
o 1 Adirondack Crabapples, blooms white -2 in dia. persistent orange fruit 15-
20 ft height, 20 ft spread
Delivery Planted Staked Mulched $14,000.00
Source: Village of Ephraim website. First collected Oct 10, 2026.