Historic Preservation Committee — Agenda packet
Village of Ephraim · Door County · Historic Preservation Committee · meeting of Jul 28, 2026 · Agenda packets
Open the original document More from Village of Ephraim
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
VILLAGE OF EPHRAIM
FOUNDED 1853
HISTORIC PRESERVATION COMMITTEE AGENDA
Tuesday, July 28, 2026 – 6:30 pm
9996 Water Street
NOTE: This Meeting will be simultaneously held via teleconferencing. Staff, committee members
and the public are welcome to participate in this manner. Teleconferencing will be available by
computer, phone, tablet, or dial in. Connection information below:
1. Call to Order
2. Quorum
3. Changes in Agenda
4. Visitors’ Comments
5. Approve Previous HPC Minutes
6. Julia Uihlein – 10235 Hwy 42 – Landscape/Land Disturbance Plan
7. PEA Properties – 9751 Hwy 42 – Accessory Structure – Design Review
8. PEA Properties – 9751 Hwy 42 – Addition – Design Review
9. Doug Evans – 9807 Brookside Ln –Additions – Concept Review
10. New Business for Next Meeting/Next Meeting Date
11. Adjournment
Please join my meeting from your computer, tablet or smartphone.
https://meet.goto.com/825491853
You can also dial in using your phone.
Access Code: 825-491-853
United States: +1 (571) 317-3122
* It is possible that a quorum of the Village Board or other Village Committees may be present at the meeting. However,
no action will be taken by the Board or any other committee unless specifically noticed.
Date: 7/24/2026
Andrea Collak, Clerk X Village Administrative Office
X Visitors’ Center
X Post Office
Kim Roberts, Deputy Clerk X Website www.ephraim.wi.gov
X Emailed to WDOR Radio
X Emailed to Peninsula Pulse
Administrative Office 10005 Norway Road PO Box 138 Ephraim WI 54211
Phone: (920) 854-5501 Fax: (920) 854-2072 E-Mail: office@ephraim.wi.gov
Historic Preservation Committee Meeting Minutes
Tuesday, March 31, 2026 – 6:30 PM
Present: Marcia Ellis, Kathy Pentler, Cody Schreck
Absent: BD Thorp-Chair, Amy Russell
Staff: Brent Bristol- Administrator, Andrea Collak – Clerk/Treasurer
Guests Present: Andy Bartelt, Ken Nelson, Monique McClean, Grace Held, Rick Hoyerman
Guests Online: Gregory Golterman
1. Call to order: The meeting was called to order by Brent Bristol-Administrator at 6:30 PM.
Bristol asked the committee members to appoint the temporary chair for this meeting.
Ellis moved, Pentler seconded to appoint Cody Schreck the temporary chair for this
meeting, all ayes and the motion carried.
2. Quorum: A quorum is present for this meeting.
3. Changes in Agenda: None
4. Visitors’ comments: None
5. Previous minutes: February 24, 2026
Pentler moved, Ellis seconded to approve the HPC meeting minutes from February 24,
2026, as presented, all ayes, and the motion carried.
6. John & Victoria Cultra – 9887 Water St – New SFR – Concept Review
Bristol explained that the application before the committee was identical to what was presented to
the committees at the last meeting. He noted that concerns were raised at the Plan Committee
level, and there were questions that the Plan Committee needed to answer regarding dimensional
requirements, specifically whether the square footage for the garage could be added to the building
as part of the building footprint. Given these outstanding questions, the applicants chose to pursue
the same application for concept review at this meeting.
Pentler expressed continued concerns about the size and grandeur of the proposed house. She
stated it was a beautiful house but not appropriate for the lot it would be placed on, noting it would
become the focal point when entering Ephraim next to the beach. She had significant concerns
about the view from the water, mentioning knee walls where patios are located and a permanent
roof that appears part of the main roof. Pentler suspected the intention might be to enclose these
areas in the future, similar to what occurred at the last Plan Committee meeting. Pentler
emphasized the need for the structure to be more like a house rather than its current proposed form.
Ellis agreed with Pentler after reviewing the historic preservation ordinances, stating the proposal
was on the large side.
Schreck echoed both committee members' concerns, emphasizing two key considerations not fully
addressed previously: compatible infill and mass and scale.
Pentler raised additional concerns about blue shutters, noting that approved colors are gray, white,
and natural stone. She also questioned the door design. Pentler emphasized that there should be
efforts to save what currently exists on the property, and if a year-round house was desired, the
VILLAGE OF EPHRAIM
FOUNDED 1853
Historic Preservation Committee Meeting Minutes
Tuesday, March 31, 2026
Page 2 of 3
new structure should resemble the original house. She felt the proposed design did not look close
to what was there or anything else on the main street in the Historic District. She stressed the
importance of addressing views from both the road and the water.
Schreck summarized that the primary concerns were mass and scale, particularly regarding
precedent in the Protected Waterfront area and how the building would fit with surrounding
structures in terms of compatible infill.
7. Gregory Golterman – 9917 Water St – New SFR – Concept Review
Pentler identified this as a project with logs and bluish-gray coloring. From her interpretation of
the plans, it appeared to maintain the same footprint while raising the roofline to create a second
story, leaving the road view relatively intact. She considered this the closest she had seen to
someone sticking to the original vision and hoped they would maintain the gray logs as well.
Schreck clarified that the packet indicated this would be a complete teardown of the foundation
with a full rebuild, though maintaining the same footprint.
Pentler asked about whether the second story vertical walls would be cedar. Gregory Golterman,
participating in the meeting, confirmed it would be cedar. He also mentioned they planned to save
the original logs and attempt to use them in some of the facade to maintain the original look and
historic charm.
Pentler inquired about the roof slopes in the front where three windows were located, asking if
they were making the roof into a vertical cedar wall. Schreck explained that the dormer was being
fully removed and replaced with flat siding.
Pentler asked about square footage additions. Golterman estimated the total would be roughly
1,500 square feet, up from approximately 1,100 square feet currently, adding about 400 square
feet. Pentler found this reasonable.
Regarding height, Schreck noted the application showed 23 feet to the top of the roofline. Pentler
expressed no issues with what she was seeing.
Ellis praised the project, particularly loving that they would be using the original logs.
Schreck appreciated the current log building's appearance and understood the need to update it for
current requirements. He expressed concern about completely tearing down one of the shoreline
buildings that strongly holds onto Ephraim's character aesthetically. While the replacement
building borrowed from the original, he had concerns about mass and scale, particularly the
building height on the Protected Waterfront, and wanted to hear Plan Committee input.
Pentler asked if they could keep the outside structure intact, gut it from within, reinforce it, and
add the top half to maintain authenticity. Golterman explained that three contractors said no, with
one saying it could be done but hadn't responded in seven months. The contractors explained that
the building had multiple elevations from its history as a fishing cottage with front and back
additions at different levels, making leveling it extremely difficult.
Historic Preservation Committee Meeting Minutes
Tuesday, March 31, 2026
Page 3 of 3
Pentler acknowledged that the varied levels gave the building its charming appearance, showing it
grew with the Village.
Regarding colors, Golterman confirmed it would be light gray, possibly slightly lighter to match
the neighboring cottage, maintaining the same gray tone. For the chimney, he wasn't certain if they
would use the original but confirmed all stonework would be Door County Fieldstone.
Pentler commended the applicants for trying to preserve the scale and look without presenting a
grandiose plan that wouldn't fit the area. Golterman confirmed this was their specific goal.
8. Carol Corbett – 10081 Water St. – Addition – Concept Review
Due to lack of information this matter will be discussed at the future meeting.
9. New Business for the Next Meeting/Next Meeting Date: No new business was identified for the
next meeting. The next meeting date is Tuesday, April 28th, 2026.
10. Adjournment
Pentler moved, Ellis seconded to adjourn the Historic Preservation Committee Meeting at
6:50 PM, all ayes, and the motion carried.
Recorded by,
Andrea Collak- Clerk/Treasurer
1
VILLAGE OF EPHRAIM
HISTORIC PRESERV ATION COMMITTEE
MEETING MINUTES
TUESDAY, MAY 26, 2026 – 6:15 PM
9996 WATER STREET
ACTION ITEMS:
Schreck moved, Pentler seconded to approve the April 28, 2026 Historic Preservation Committee minutes
as presented, all ayes. Motion carried.
Schreck moved, Pentler seconded to approve the new SFR Design Review Application for John and
Victoria Cultra at 9887 Water Street, as presented. Roll Call Vote: Schreck aye, Pentler nay, and Thorp
nay. Motion failed.
Pentler moved, Schreck seconded to approve the Addition Design Review Application for Gregory
Goltermann at 9917 Water Street, as presented, all ayes. Motion carried.
Shreck moved, Pentler seconded to approve the Addition Design Review Application for Roy Harsch at
9931 Water Street, as presented, all ayes. Motion carried.
Schreck moved, Pentler seconded to approve the Deck/Guard Rails Design Review Application for Ann
Abbott at 9886 Water Street, as presented, all ayes. Motion carried.
Schreck moved, Pentler seconded to adjourn at 6:55 PM, all ayes. Motion carried.
Present: Kathy Pentler (online), Cody Schreck, and BD Thorp – Chair.
Absent: Amy Russell and Marcia Ellis.
Staff: Brent Bristol - Village Administrator and Kim Roberts - Deputy Clerk.
Guests in person: Drew Willmann (DeLeer’s Construction), Chris Schmeltz, Ken Nelson, Laird Hart, Andy
Bartelt, Grace Held, Monique McClean, Rick Hoyerman, Kelsey Stone (EBC), and Roy Harsch.
Guests online: John and Victoria Cultra .
1. Call to order:
Thorp called the meeting to order at 6:15 PM.
2. Quorum:
A quorum of the Historic Preservation Committee was present.
3. Changes in agenda:
There were no changes to the agenda.
4. Visitors’ Comments:
There were no visitors’ comments.
5. Approval of previous minutes:
Schreck moved, Pentler seconded to approve the April 28, 2026 Historic Preservation Committee
minutes as presented, all ayes. Motion carried.
6. John and Victoria Cultra – 9887 Water Street -New SFR – Design Review:
Bristol explained that the project had been before the Committee previously for concept review. He
explained that the Cultras had received guidance from both HPC and the Plan Committee regarding roof
design, particularly concerning dormers on the primary roof and the pitch of the roof over the screened
porch. The applicants had redesigned the project to address these concerns.
John Cultra, participating virtually with his wife Victoria, explained they had reduced the number of
exterior lights as requested by the Committee, placing lights only at doorways. He noted they had worked
to simplify the design and address concerns about rooflines and dormers.
2
Pentler raised concerns about the blue door color, questioning whether it would match existing Village
blues and suggested the Village should provide clearer guidelines for historic colors.
John Cultra explained that there was a lot of blue in the Village and they intend to use "Ephraim Blue"
consistent with other historic buildings within the Village. He expressed willingness to work with the
Committee on selecting an appropriate shade.
Pentler expressed concerns about the multiple roof lines and peaks, suggesting the design still appeared
too complex with a lot of sharp angles.
John Cultra noted that they had removed the bumpouts on the front elevation and put in bay windows to
match the existing structure.
Schreck noted that he liked the blue shutters and door. He further discussed that the rooflines have moved
in the right direction; he was not sure what else could be done. He stressed that there was a good
reduction in lighting.
The Committee further discussed the addition of the shutters to the plan set. Thorp questioned why they
were added since the last presentation. John Cultra noted that so much was changed and simplified that
they felt the shutters would add aesthetic appeal.
Pentler questioned whether certain roof elements could be extended, such as over the breezeway, by way
of making it flatter.
Drew Willmann, the representative from DeLeers, explained that there were minimum roof pitches per
Village ordinance, which required the roof line to be raised, as well as the need for functional access. He
noted they had significantly simplified the west elevation since the previous presentation.
Thorp noted concerns about the west elevation's roofline complexity and admitted he should have been
more explicit about his reservations during the previous month's approval.
Schreck moved, Pentler seconded to approve the new SFR Design Review Application for John and
Victoria Cultra at 9887 Water Street, as presented. Roll Call Vote: Schreck aye, Pentler nay, and
Thorp nay. Motion failed.
John Cultra expressed confusion about the change in Committee sentiment, noting they had made all
requested modifications since receiving the previous approval and had only simplified the design further.
Thorp explained that, in part due to running the meeting last month, he did not get a chance to express his
concerns regarding the roof lines, although he approved the concept last month. He thought the roofline
would be corrected; he felt it was not changed enough on the west elevation. While the plans have
improved greatly, he felt they could be simplified further.
John Cultra stressed that they had worked hard to address the Committee’s concerns and simplify the
plan, especially from the front elevation. He expressed concern that the failed approval would carry
negatively to the Plan Committee.
7. Gregory Golterman – 9917 Water Street – Addition – Design Review:
Bristol explained that this was the first formal hearing for this project, following previous concept review
sessions. Brent explained that the applicant had originally planned a full teardown and rebuild but had
found a contractor capable of preserving the first floor while adding a partial second story.
The Committee discussed the design materials, with Bristol noting the roof would be CertainTeed
Landmark in driftwood color - a black base with gray and slight bluish-gray tones in the asphalt shingles.
Schreck expressed satisfaction that the Goltermanns had pursued preserving a portion of the original
building, stating this was much preferred over complete demolition. While acknowledging the front
elevation showed some complexity with roof lines, he noted the existing building already had a stacked
appearance. Pentler praised the size, design, and rectangular second story addition, noting the good color
choices and historic materials used.
3
Pentler moved, Schreck seconded to approve the Addition Design Review Application for Gregory
Goltermann at 9917 Water Street, as presented, all ayes. Motion carried.
8. Roy Harsch – 9931 Water Street – Addition – Design Review:
Bristol provided extensive background on this complex project, explaining that it began with work
started without permits, resulting in a stop-work order. The Harsch’s had initially sought variances for
setback issues but were denied by the Board of Appeals. Amendments to the Protected Waterfront
Ordinances allowed potential footprint modifications if the offsetting footprint was removed elsewhere
on the property. The current project required a property exchange with neighboring property owners to
address setback issues, which was conditionally approved upon Plan Committee approval of the
footprint modification. The addition would be on the water side while removing/modifying a portion of
the small structure closest to STH 42. Bristol explained that the request is to proceed with finishing the
addition, match all existing materials, and partially remove/ modify the small structure closest to STH
42.
Roy Harsch explained the addition would use the same materials as the existing structure: 8-inch cedar
siding painted white, along with green shingles matching the current roof. He described the personal
necessity of the project, explaining that his wife uses a walker and they need to reconfigure the kitchen
to accommodate modern appliances and accessibility needs.
Schreck noted that from an HPC perspective, matching materials and maintaining architectural
consistency addressed the Committee's primary concerns.
Shreck moved, Pentler seconded to approve the Addition Design Review Application for Roy
Harsch at 9931 Water Street, as presented, all ayes. Motion carried.
9. Ann Abbott – 9886 Water Street – Deck/Guard Rails – Design Review:
Bristol explained that snow damage had pulled the existing deck away from the house, creating an
opportunity to replace both decking and guardrails. The new guardrails would be similar to white Trex-
style railings previously approved, and the decking would be light gray Trex material.
With no applicant representative present, the Committee reviewed the materials samples provided. There
were no concerns with the proposed materials.
Schreck moved, Pentler seconded to approve the Deck/Guard Rails Design Review Application for
Ann Abbott at 9886 Water Street, as presented, all ayes. Motion carried.
10. New Business for next meeting / next meeting date:
No new business was noted.
The next meeting of the Historic Preservation Committee is June 23, 2026.
11. Adjournment:
Schreck moved, Pentler seconded to adjourn at 6:55 PM, all ayes. Motion carried.
Recorded by, Kim Roberts – Deputy Clerk
PERMEABLE
PAVER/COBBLE
PAVING
591.5
FFE
587.4
FFE
SPR SPR
CDR
CDR
CDR
ASH
CDR
FLLN
CDR
CDR
CDR
CDR
CDR
CDR
MPL
LCST
CDR
CDR
CDR
CDR
CDR
CDR
LCST
MPL
MPLASHLCST
ASH
MPL MPL MPLCDR
CDR
CDR
CDR
CDR
CDR
CDR
CDR
MPL
ELM
CDR
CDR
CDR
CDR
CDR
CDR
ELM
ELM
CDR
LRCH
LRCH LRCH
LRCH
LRCH
MPL
CDR
CDR
CDR
CDR
CDR
CDR
HEM
CDR
CDR
CDR
CDR
SPR SPR
CDRCDR
CDR
CEDAR STONE
COTTAGE
601.1
FFE
600.85
PFE
600.8
GFE
CDR
CDR
CDR
MPL
MPL
MPL
MPL MPL
ASH/DEAD
ASH/DEAD
BSWD
MPL
CDR
MPL
CDR
CDR
CDR
CDR
CDR
CDR
CDR
CDR
CDR
CDR
BSWD
CDR
CDR
CDR
CDR
CDR
CDR
CDR
CDR
CDR
CDR
CDR
CDR
CDR
CDR
CDR
CDR
MPL
MPL
CDR
LOW/MOIST
AREA 7-1-13
ELC
TRNS
PLANTING
BED
PLANTING
BED
PLANTING
BED
PLANTING
BED
PLANTING
BED
PLANTING
BED
PLANTING
BED
PLANTING
BEDPLANTING
BED
ASPHALT
DRIVE
PLANTING
BED
FENCED
DOG RUN
SODDED
LAWN
PLANTING
BED
PLANTING
BED
SODDED
LAWN
SODDED
LAWN
SODDED
LAWN
S T A T E H W Y '42'
GRAY LOGS
COTTAGE
RENOVATED
ASPHALT DRIVE
ASPHALT
MOTORCOURT
EXISTING ASPHALT
DRIVE
ASPHALT
DRIVE
EXISTING
LITTLE
DRAGONFLY
COTTAGE
EXISTING
BIG
DRAGONFLY
COTTAGE
GARAGE
ASH/DEAD
CDR
SODDED
CDR
CDR
A/CA/C
GEN
SODDED
LAWN
RENOVATED
ASPHALT DRIVE
GEN
12' 2" X 3' 4"
A/C
31"
A/C
31"
A/C
31"
A/C
31"
A/C
31"
PLANTING
BED
CBL
VT (3)
WF/SMP/VT
VTVT EO
VT
EO/VT
VT
VT (3) WTR EM VT (2) GS
EO(2)
WF/DS
EO
EO
GSEO/VTVT
VTVTVT
EO
EO
EO
DS
DS
DS
DS
DS
STMP
STMP
STRM
STRM
STRM
STRM
STRM
STRM
PLANTING
BED
PLANTING
BED
BUNKHOUSE
CABIN
592.5
FFE
SODDED
LAWN
WASH CABIN
1"- 3" BEACH STONE OVER
LANDSCAPE FABRIC.
EXPOSED BED ROCK OR
WEATHERED LIMESTONE
BOULDER OUTCROP RETAINING
AT DRIVE EDGES.
BEGIN CUT FOR DRIVE SLOPE
AT THIS POINT
TERRACED LIMESTONE BOULDER
RETAINING WALLS
LOWER WELL HEAD
~2' & TOP WITH A
HOLLOW BOULDER
1"- 12" BEACH STONE DRY CREEK BED
OVER LANDSCAPE FABRIC. CHARACTER
BOULDERS PLACED AT EDGES. WATER
TO BE CONVEYED TO WETLAND VIA AN
18" CATCH BASIN 6" SOLID PIPE15" HIGH LIMESTONE
BOULDER OUTCROP
RETAINING
18"-24" HIGH LIMESTONE BOULDER
OUTCROP RETAINING
2.5' HIGH LIMESTONE
BOULDER RETAINING WALL
3.5' HIGH LIMESTONE BOULDER
RETAINING WALL 3.5' HIGH LIMESTONE BOULDER
RETAINING WALLS. WALLS TO
EXTEND ABOVE GRADE ~ 21"
EFFLUENT TANK W/
MANHOLES
LIMESTONE STEPPERS
DRY SET FLAGSTONE PAVING.
JOINTS TO BE TIGHT & EDGES
TO BE IRREGULAR.
LIMESTONE BOULDER OUTCROP
TO CONNECT BEDROCK TO
FOUNDATION
12"-36" HIGH LIMESTONE
BOULDER RETAINING WALL
5' WIDE LIMESTONE
STEPPER PATHWAY
3'-4' WIDE IRREGULAR "LILY PAD"
LIMESTONE SLAB STEPS
3' HIGH LIMESTONE
BOULDER OUTCROP
RETAINING5.5'-7' WIDE IRREGULAR "LILY PAD"
LIMESTONE SLAB STEPS;
7" RISERS
IRREGULAR "LILY PAD"
LIMESTONE SLAB STEPS;
7.5" RISERS
3' HIGH LIMESTONE
BOULDER OUTCROP
RETAINING
CHARACTER/SEAT BOULDERS
AT LAWN EDGE
GRADE TO BEGIN ROLLING & SLOPING
DOWN AT THE LAWN EDGE
36" WIDE CEDAR MULCH
PATHWAY WITH WEATHERED
STONE STEPS
CHARACTER/SEAT BOULDERS
AT PERIMETER OF PATIO
LEVEL EXISTING GRAVEL RIDGE & TOP WITH
DRY SET FLAGSTONE PAVING. JOINTS TO
BE TIGHT & EDGES TO BE IRREGULAR.
FIRE RING WITH
WEATHERED STONE
SURROUND. TO HAVE A
LOG LIGHTING SYSTEM
WITHIN RING.
5' WIDE ELEVATED &
FLOATING BOARDWALK.
EDGES TO BE CUT EVEN
WITH EACH OTHER.
EXISTING UTILITY POLE
EXISTING GENERATOR
EXISTING ELECTRICAL PANELS
EXISTING CHARTER &
ELECTRICAL TRANSFORMER
EXISTING WELL HOUSE
EXISTING SANITARY
LIFT STATION
EXISTING RIP RAP
EXISTING NORTHERN
PROPERTY LINE
EXISTING IRON PIPE
EXISTING IRON PIPE
EXISTING SOUTHERN
PROPERTY LINE
LOCATION OF BURIED
PROPANE TANKS
16' WIDE TURFSTONE DRIVE;
CORES TO BE CHIPPED STONE.
APPROXIMATE
LOCATION OF
PROPOSED DOCK
18"-24" HIGH LIMESTONE
BOULDER RETAINING WALL
2 SEAT STONES
PROTRUDING FROM WALL
LIMESTONE BOULDER
OUTCROP RETAINING
IRREGULAR "LILY PAD"
LIMESTONE SLAB STEPS;
7.0" RISERS
3.5' WIDE LIMESTONE
STEPPER PATHWAY
42" HIGH FENCE SURROUNDING
UTILITIES & DOG RUN WITH 3' & 4'
GATES
BURIED 4" DRAIN TILE 6' HIGH RED CEDAR
FENCE WITH 4' GATE
3.5' WIDE LIMESTONE
STEPPER PATHWAY
BURIED 4" DRAIN TILE
18" HIGH LIMESTONE
BOULDER OUTCROP
RETAINING
6"-24" HIGH LIMESTONE
RETAINING WALL
MIXED CHARACTER BOULDERS
& LIMESTONE OUTCROPPING
3' WIDE LIMESTONE
STEPPER PATHWAY
BURIED 4"& 6" DRAIN
TILE
MULCHED
PARKING AREA
LOCATION OF PROPANE
TANK REGULATORS
N
DESIGN.PLANT.BUILD.MAINTAIN
Phone: 920. 743.1011
Fax: 920.743.8878
www.meissnerlandscape.com
PERMEABLE
PAVER/COBBLE
PAVING
591.5
FFE
587.4
FFE
SPR SPR
CDR
CDR
CDR
ASH
CDR
FLLN
CDR
CDR
CDR
CDR
CDR
CDR
CDR
CDR
CDR
ELM
CDR
CDR
CDR
CDR
CDR
CDR
ELM
ELM
CDR
LRCH
LRCH LRCH
LRCH
LRCH
MPL
CDR
CDR
CDR
CDR
CDR
CDR
HEM
CDR
CDR
CDR
CDR
SPR SPR
CDRCDR
CDR
CEDAR STONE
COTTAGE
601.1
FFE
600.85
PFE
600.8
GFE
MPL
CDR
BSWD
CDR
CDR
CDR
CDR
CDR
CDR
CDR
CDR
ELC
TRNS
PLANTING
BED
PLANTING
BED
PLANTING
BED
PLANTING
BED
PLANTING
BED
PLANTING
BED
PLANTING
BED
PLANTING
BEDPLANTING
BED
PLANTING
BED
FENCED
DOG RUN
SODDED
LAWN
PLANTING
BED
PLANTING
BED
SODDED
LAWN
SODDED
LAWN
SODDED
LAWN
GRAY LOGS
COTTAGE
RENOVATED
ASPHALT DRIVE
EXISTING
LITTLE
DRAGONFLY
COTTAGE
GARAGE
ASH/DEAD
GEN
12' 2" X 3' 4"
A/C
31"
A/C
31"
A/C
31"
A/C
31"
A/C
31"
PLANTING
BED
CBL
VT (3)
WF/SMP/VT
VTVT EO
VT
EO/VT
VT
VT (3) WTR EM VT (2) GS
EO(2)
WF/DS
EO
EO
VTVTVT
EO
EO
EO
DS
DS
DS
DS
DS
STMP
STMP
STRM
STRM
STRM
STRM
STRM
STRM
PLANTING
BED
PLANTING
BED
BUNKHOUSE
CABIN
592.5
FFE
SODDED
LAWN
WASH CABIN
1"- 3" BEACH STONE OVER
LANDSCAPE FABRIC.
BEGIN CUT FOR DRIVE SLOPE
AT THIS POINT
TERRACED LIMESTONE BOULDER
RETAINING WALLS
LOWER WELL HEAD
~2' & TOP WITH A
HOLLOW BOULDER
1"- 12" BEACH STONE DRY CREEK BED
OVER LANDSCAPE FABRIC. CHARACTER
BOULDERS PLACED AT EDGES. WATER
TO BE CONVEYED TO WETLAND VIA AN
18" CATCH BASIN 6" SOLID PIPE15" HIGH LIMESTONE
BOULDER OUTCROP
RETAINING
18"-24" HIGH LIMESTONE BOULDER
OUTCROP RETAINING
2.5' HIGH LIMESTONE
BOULDER RETAINING WALL
3.5' HIGH LIMESTONE BOULDER
RETAINING WALL 3.5' HIGH LIMESTONE BOULDER
RETAINING WALLS. WALLS TO
EXTEND ABOVE GRADE ~ 21"
EFFLUENT TANK W/
MANHOLES
LIMESTONE STEPPERS
DRY SET FLAGSTONE PAVING.
JOINTS TO BE TIGHT & EDGES
TO BE IRREGULAR.
LIMESTONE BOULDER OUTCROP
TO CONNECT BEDROCK TO
FOUNDATION
12"-36" HIGH LIMESTONE
BOULDER RETAINING WALL
5' WIDE LIMESTONE
STEPPER PATHWAY
3'-4' WIDE IRREGULAR "LILY PAD"
LIMESTONE SLAB STEPS
3' HIGH LIMESTONE
BOULDER OUTCROP
RETAINING5.5'-7' WIDE IRREGULAR "LILY PAD"
LIMESTONE SLAB STEPS;
7" RISERS
IRREGULAR "LILY PAD"
LIMESTONE SLAB STEPS;
7.5" RISERS
3' HIGH LIMESTONE
BOULDER OUTCROP
RETAINING
CHARACTER/SEAT BOULDERS
AT LAWN EDGE
GRADE TO BEGIN ROLLING & SLOPING
DOWN AT THE LAWN EDGE
36" WIDE CEDAR MULCH
PATHWAY WITH WEATHERED
STONE STEPS
CHARACTER/SEAT BOULDERS
AT PERIMETER OF PATIO
LEVEL EXISTING GRAVEL RIDGE & TOP WITH
DRY SET FLAGSTONE PAVING. JOINTS TO
BE TIGHT & EDGES TO BE IRREGULAR.
FIRE RING WITH
WEATHERED STONE
SURROUND. TO HAVE A
LOG LIGHTING SYSTEM
WITHIN RING.
5' WIDE ELEVATED &
FLOATING BOARDWALK.
EDGES TO BE CUT EVEN
WITH EACH OTHER.
EXISTING GENERATOR
EXISTING ELECTRICAL PANELS
EXISTING CHARTER &
ELECTRICAL TRANSFORMER
EXISTING WELL HOUSE
EXISTING RIP RAP
EXISTING NORTHERN
PROPERTY LINE
EXISTING SOUTHERN
PROPERTY LINE
16' WIDE TURFSTONE DRIVE;
CORES TO BE CHIPPED STONE.
APPROXIMATE
LOCATION OF
PROPOSED DOCK
18"-24" HIGH LIMESTONE
BOULDER RETAINING WALL
2 SEAT STONES
PROTRUDING FROM WALL
LIMESTONE BOULDER
OUTCROP RETAINING
IRREGULAR "LILY PAD"
LIMESTONE SLAB STEPS;
7.0" RISERS
3.5' WIDE LIMESTONE
STEPPER PATHWAY
42" HIGH FENCE SURROUNDING
UTILITIES & DOG RUN WITH 3' & 4'
GATES
BURIED 4" DRAIN TILE 6' HIGH RED CEDAR
FENCE WITH 4' GATE
3.5' WIDE LIMESTONE
STEPPER PATHWAY
BURIED 4" DRAIN TILE
18" HIGH LIMESTONE
BOULDER OUTCROP
RETAINING
6"-24" HIGH LIMESTONE
RETAINING WALL
MIXED CHARACTER BOULDERS
& LIMESTONE OUTCROPPING
3' WIDE LIMESTONE
STEPPER PATHWAY
BURIED 4"& 6" DRAIN
TILE
N
DESIGN.PLANT.BUILD.MAINTAIN
Phone: 920. 743.1011
Fax: 920.743.8878
www.meissnerlandscape.com
PERMEABLE
PAVER/COBBLE
PAVING
591.5
FFE
587.4
FFE
SPR SPR
CDR
CDR
CDR
ASH
CDR
FLLN
CDR
CDR
CDR
CDR
CDR
CDR
MPL
LCST
CDR
CDR
CDR
CDR
CDR
CDR
LCST
MPL
MPLASHLCST
ASH
MPL MPL MPLCDR
CDR
CDR
CDR
CDR
CDR
CDR
CDR
MPL
ELM
CDR
CDR
CDR
CDR
CDR
CDR
ELM
ELM
CDR
LRCH
LRCH LRCH
LRCH
LRCH
MPL
CDR
CDR
CDR
CDR
CDR
CDR
HEM
CDR
CDR
CDR
CDR
SPR SPR
CDRCDR
CDR
CEDAR STONE
COTTAGE
601.1
FFE
600.85
PFE
600.8
GFE
CDR
CDR
CDR
MPL
MPL
MPL
MPL MPL
ASH/DEAD
ASH/DEAD
BSWD
MPL
CDR
MPL
CDR
CDR
CDR
CDR
CDR
BSWD
CDR
CDR
CDR
CDR
CDR
CDR
CDR
CDR
CDR
ELC
TRNS
PLANTING
BED
PLANTING
BED
PLANTING
BED
PLANTING
BED
PLANTING
BED
PLANTING
BED
PLANTING
BED
PLANTING
BEDPLANTING
BED
RESHAPED
DRIVE
PLANTING
BED
FENCED
DOG RUN
SODDED
LAWN
PLANTING
BED
PLANTING
BED
SODDED
LAWN
SODDED
LAWN
SODDED
LAWN
S T A T E H W Y '42'
GRAY LOGS
COTTAGE
RENOVATED
ASPHALT DRIVE
ASPHALT
MOTORCOURT
RESHAPED
DRIVE
EXISTING
LITTLE
DRAGONFLY
COTTAGE
EXISTING
BIG
DRAGONFLY
COTTAGE
GARAGE
ASH/DEAD
SODDED
LAWN
SODDED
LAWN
GEN
12' 2" X 3' 4"
A/C
31"
A/C
31"
A/C
31"
A/C
31"
A/C
31"
PLANTING
BED
CBL
VT (3)
WF/SMP/VT
VTVT EO
VT
EO/VT
VT
VT (3) WTR EM VT (2) GS
EO(2)
WF/DS
EO
EO
GSEO/VTVT
VTVTVT
EO
EO
EO
DS
DS
DS
DS
DS
STMP
STMP
STRM
STRM
STRM
STRM
STRM
STRM
PLANTING
BED
PLANTING
BED
BUNKHOUSE
CABIN
592.5
FFE
SODDED
LAWN
WASH CABIN
N
DESIGN.PLANT.BUILD.MAINTAIN
Phone: 920. 743.1011
Fax: 920.743.8878
www.meissnerlandscape.com
SHEET:
SCALE:
DATE DRAWN:
TITLE PAGE
6/16/26 PEA Builders Inc.
W195 S7548 Woodland Pl.,
Muskego, WI 53150
Ph: (414) 324-6123
SStteevvee && MMaarryy HHoommaa
99775511 WWaatteerr SStt..
EEpphhrraaiimm,, WWII 5544221111
PPhh ((441144)) 332244--66112233
#/#" = 1'-0"
DATE REVISED:
DRAWN BY:
-
A-1.1
PAGE TABLE
Label Ti tle Comments
A-1.1 TITLE PAGE
A-1.2 EXISTING & PROPOSED PLANS
A-1.3 ELEVATIONS & SCHEDULES
A-1.4 ELEVATIONS & ROOF PLAN
A-2.1 SECTION & PROPOSED ELECTRICAL PLAN
BID SET
1st Floor Living 758 S/F
Bedroom Suite Addition 356 S/F
Deck Addition 190 S/F
EPHRAIM COTTAGE
UP
UP
S1
A-2.1
S1
A-2.1
S1
A-2.1
S1
A-2.1
E4
A-1.4
E4
A-1.4
E1
A-1.3
E1
A-1.3
E3
A-1.3
E3
A-1.3
E2
A-1.4
E2
A-1.4
10'-0 11/16" 20'-2 1/4" 8'-0 5/8" 15'
7'-11 3/4"
13'-11 1/16"
14'-1 3/4"
CL
7'-10 1/16"7'-10 1/16"
4'-3 1/2" 17'-2 9/16" 12'-1 3/16"
15'-8 5/8"
22'-7 9/16"
11'-11 1/2"
13'-6" X 9'-8"
14'-5" X 21'-8"
4'-6" X 9'-9"
5'-8" X 4'-6"
7'-8" X 5'-3"
7'-2" X 11'-6"
19'-5" X 11'-8"
5'-6" X 9'-8"
9'-7" X 11'-0"
EX. GARAGE
EX. BEDROOM
PROP. GREAT RM
EX. BATH
EX. BEDROOM
PROP. FOYER
PROP. KITCHEN
DOUBLE 11 7/8"
MICROLAM
EX. PATIO
EX. PATIO
TRIPLE 2X8 BEAM
2x8 JOISTS 16" OC.
11 7/8" OPEN JOISTS
16" OC
PROPOSED UPDATED FIRST FLOOR
SCALE: 1/4 IN = 1 FT
PROPOSED UPDATED FIRST FLOOR
SCALE: 1/4 IN = 1 FT
2436RS
2436RS2436RS286828682436RS2436RS
28682436RS
2868
2436RS
2436RS
2436RS 2468
2436RS
2436RS
2868
2868
2468
4068
80703068
2468 2068
10'-0 5/8" 20'-2 1/4" 7'-11 5/8"
38'-2 1/2"
12'-2" 9'-11 1/2"
34'-1 1/2"
14'-1 3/4" 12'
15'-7"7'-11 3/4"13'-10 3/4"
38'-2 1/2"
19'-5" X 11'-4"
13'-6" X 9'-8"
7'-6" X 5'-2"
5'-7" X 9'-8"
9'-8" X 11'-0"
7'-2" X 11'-7"
14'-2" X 21'-8"
GARAGE
KITCHEN
LIVING
BEDROOM
BEDROOM
FOYER
BATH
EXISTING PLAN
SCALE: 1/4 IN = 1 FT
EXISTING PLAN
SCALE: 1/4 IN = 1 FT
D13D13
W04W04
W04W04
W01W01 D17D17 W01W01
W04W04
W04W04
W02W02W02W02
D11D11
D12D12
D05D05
22'-9"
3'-11 7/8" 15'-9 1/16"
22'-9" 12'
15'-8 1/8"
3'-8" 11'-1 5/8"
1'-3"
4'
2'-1"
15'-5 1/8"
15'-1 1/8"6'-4 1/2"
20'-6 5/8"
15'-9" X 12'-0"
15'-0" X 15'-4"
11'-1" X 6'-4"
DECK
PROP. BEDROOM
PROP. BATH
PROPOSED SECOND FLOOR ADDITION
SCALE: 1/4 IN = 1 FT
PROPOSED SECOND FLOOR ADDITION
SCALE: 1/4 IN = 1 FT
SHEET:
SCALE:
DATE DRAWN:
EXISTING & PROPOSED
PLANS
6/16/26 PEA Builders Inc.
W195 S7548 Woodland Pl.,
Muskego, WI 53150
Ph: (414) 324-6123
SStteevvee && MMaarryy HHoommaa
99775511 WWaatteerr SStt..
EEpphhrraaiimm,, WWII 5544221111
PPhh ((441144)) 332244--66112233
#/#" = 1'-0"
DATE REVISED:
DRAWN BY:
-
A-1.2
BID SET
PROPOSED BUILDING NOTES
NO CHANGE TO THE EXISTING FOOTPRINT
ADDITION CONSISTS OF
-GARAGE SECOND LEVEL BEDROOM SUITE
-DECK ADDITION TO BEDROOM SUITE
- KITCHEN EXPANSION REMOVAL OF WALL
2X4 EXTERIOR WALLS
SIDING OF ADDITION TO MATCH EXISTING
BOTTOM OF FOOTING
-7.8'
TOP OF FOOTING
-7.2'
8"
TOP OF SUBFLOOR - FOUNDATION
-2.8'
4'-4"
TOP OF SUBFLOOR - 2ND FLOOR
5.8'
8'-7"
TOP OF PLATE
14.3'
8'-7"
HIGHEST RIDGE
18.8'
4'-5 5/8"
E1 ELEVATION 1
SCALE: 1/4 IN = 1 FTE1 ELEVATION 1
SCALE: 1/4 IN = 1 FT
BOTTOM OF FOOTING
-7.8'
TOP OF SUBFLOOR - FOUNDATION
-2.8'
5'
TOP OF SUBFLOOR - 1ST FLOOR
0'
2'-10"
TOP OF SUBFLOOR - 2ND FLOOR
5.8'
5'-9"
TOP OF PLATE
14.3'
8'-7"
HIGHEST RIDGE
18.8'
4'-5 5/8"
E3 ELEVATION 3
SCALE: 1/4 IN = 1 FTE3 ELEVATION 3
SCALE: 1/4 IN = 1 FT
WINDOW SCHEDULE
3D EXTERIOR ELEVATION QTY SIZE R/O COMMENTS
2 2668 EX 32"X83"
2 2436DH 29"X43"
4 3020AW 37"X25"
WINDOW SCHEDULE
SCALE: 1 IN = 1 FT
WINDOW SCHEDULE
SCALE: 1 IN = 1 FT
DOOR SCHEDULE
3D EXTERIOR ELEVATION QTY SIZE R/O
1 2668 L/R IN 32"X82 1/2"
1 2868 L IN 34"X82 1/2"
1 2868 R 34"X82 1/2"
1 2868 R EX 34"X83"
1 5568 L/R EX 67"X83"
DOOR SCHEDULE
SCALE: 1 IN = 1 FT
DOOR SCHEDULE
SCALE: 1 IN = 1 FT
SHEET:
SCALE:
DATE DRAWN:
ELEVATIONS & SCHEDULES
6/16/26 PEA Builders Inc.
W195 S7548 Woodland Pl.,
Muskego, WI 53150
Ph: (414) 324-6123
SStteevvee && MMaarryy HHoommaa
99775511 WWaatteerr SStt..
EEpphhrraaiimm,, WWII 5544221111
PPhh ((441144)) 332244--66112233
#/#" = 1'-0"
DATE REVISED:
DRAWN BY:
-
A-1.3
BID SET
WINDOWS & DOORS NOTES
NEW WINDOWS AND DOORS TO ADDITION ONLY
BOTTOM OF FOOTING
-7.8'
TOP OF SUBFLOOR - FOUNDATION
-2.8'
5'
TOP OF SUBFLOOR - 1ST FLOOR
0'
2'-10"
TOP OF SUBFLOOR - 2ND FLOOR
5.8'
5'-9"
TOP OF PLATE
9.1'
3'-4"
TOP OF PLATE
14.3'
5'-3"
HIGHEST RIDGE
18.8'
4'-5 5/8"
GRADE LINE
E2 ELEVATION 2
SCALE: 1/4 IN = 1 FTE2 ELEVATION 2
SCALE: 1/4 IN = 1 FT
TOP OF SUBFLOOR - FOUNDATION
-2.8'
TOP OF SUBFLOOR - 1ST FLOOR
0'
2'-10"
TOP OF SUBFLOOR - 2ND FLOOR
5.8'
5'-9"
TOP OF PLATE
14.3'
8'-7"
HIGHEST RIDGE
18.8'
4'-5 5/8"
GRADE LINE
E4 ELEVATION 4
SCALE: 1/4 IN = 1 FTE4 ELEVATION 4
SCALE: 1/4 IN = 1 FT
6 3/4 : 12
6 3/4 : 12
6 3/4 : 12
6 3/4 : 12
7 : 12
6 3/4 : 12
2 11/16 : 12
10'-0 11/16" 20'-2 1/4" 8'-0 5/8"
12'-3 1/2"
11'-5 3/4"
7'-5 7/8"7'-5 7/8"
4'-5 3/8" 4'-5 3/8"
10'-11 3/4"
13'-5 9/16" 7'-7 1/2"
7'-11 3/4"
ROOF DEMO
PROPOSED ADDITION ROOF PLAN
SCALE: 1/4 IN = 1 FT
PROPOSED ADDITION ROOF PLAN
SCALE: 1/4 IN = 1 FT
7 1/2 : 12
7 1/2 : 12
7 : 12
16'-8"
23'-9"
15'
17'-4 7/8"6'-4 1/8"
2'
PROPOSED ADDITION ROOF PLAN
SCALE: 1/4 IN = 1 FT
PROPOSED ADDITION ROOF PLAN
SCALE: 1/4 IN = 1 FT
SHEET:
SCALE:
DATE DRAWN:
ELEVATIONS & ROOF PLAN
6/16/26 PEA Builders Inc.
W195 S7548 Woodland Pl.,
Muskego, WI 53150
Ph: (414) 324-6123
SStteevvee && MMaarryy HHoommaa
99775511 WWaatteerr SStt..
EEpphhrraaiimm,, WWII 5544221111
PPhh ((441144)) 332244--66112233
#/#" = 1'-0"
DATE REVISED:
DRAWN BY:
-
A-1.4
BID SET
8'-5 1/2"
7'-10 11/16"
1'-10 7/8"
BOTTOM OF FOOTING
-7.8'
TOP OF FOOTING
-3.2'
4'-8"
EXISTING SUBFLOOR - 1ST FLOOR
0'
3'-2"
PROPOSED SUBFLOOR - 2ND FLOOR
5.8'
5'-9"
TOP OF PLATE
14.3'
8'-7"
HIGHEST RIDGE
18.8'
4'-5 5/8"
7'-2 5/16"
7'-5"
S1 SECTION 1
SCALE: 1/4 IN = 1 FTS1 SECTION 1
SCALE: 1/4 IN = 1 FT
R R
RR
R
R
R
R
PROPOSED ELECTRICAL ADDITION
SCALE: 1/4 IN = 1 FT
PROPOSED ELECTRICAL ADDITION
SCALE: 1/4 IN = 1 FT
SHEET:
SCALE:
DATE DRAWN:
SECTION & PROPOSED
ELECTRICAL PLAN
6/16/26 PEA Builders Inc.
W195 S7548 Woodland Pl.,
Muskego, WI 53150
Ph: (414) 324-6123
SStteevvee && MMaarryy HHoommaa
99775511 WWaatteerr SStt..
EEpphhrraaiimm,, WWII 5544221111
PPhh ((441144)) 332244--66112233
#/#" = 1'-0"
DATE REVISED:
DRAWN BY:
-
A-2.1
BID SET
AS BUILT
B4232B4232 B4232B4232
2636FA 5468 2636FA
2636FA
31026RS31026RS
2636FA 2868
4X4 POST 4X4 POST 4X4 POST 4X4 POST
4X4 POST
4X4 POST
E7
A-1.1
E7
A-1.1
E9
A-1.1
E9
A-1.1
S1
A-1.1
S1
A-1.1
S1
A-1.1
S1
A-1.1
E6
A-1.1
E6
A-1.1
E8
A-1.1
E8
A-1.1
20'-2 1/2"
7'-9"
14'-2 1/2"
12'-4"
11'-8"
8'
CL3'-3 1/4"
20'-2"
20'-2 1/2"
6'
173 SQ FT
WORK AREA
1ST FLOOR
SCALE: 1/4 IN = 1 FT
1ST FLOOR
SCALE: 1/4 IN = 1 FT
TOP OF SUBFLOOR - FOUNDATION
0'
TOP OF PLATE
7'
7'
RIDGE
9.8'
2'-9 3/16"
1"
12"
4"
12"
E6 ELEVATION 5
SCALE: 1/4 IN = 1 FTE6 ELEVATION 5
SCALE: 1/4 IN = 1 FT
B.O. FOOTING
-5'
T.O. FOOTING
-1'
4'
TOP OF SLAB
0'
1'
EXTERIOR CASING TOP
7'
6'-11 1/2"
E7 ELEVATION 6
SCALE: 1/4 IN = 1 FTE7 ELEVATION 6
SCALE: 1/4 IN = 1 FT
E8 ELEVATION 7
SCALE: 1/4 IN = 1 FTE8 ELEVATION 7
SCALE: 1/4 IN = 1 FT
E9 ELEVATION 8
SCALE: 1/4 IN = 1 FTE9 ELEVATION 8
SCALE: 1/4 IN = 1 FT
12'-4"
14'-2 1/2"
THICKENED SLAB
FOUNDATION
SCALE: 1/4 IN = 1 FT
FOUNDATION
SCALE: 1/4 IN = 1 FT
TOP OF SUBFLOOR - FOUNDATION
0'
TOP OF PLATE
7'
7'
S1 SECTION 1
SCALE: 1/4 IN = 1 FTS1 SECTION 1
SCALE: 1/4 IN = 1 FT
SHEET:
SCALE:
DATE DRAWN:
SUGAR SHACK
7/17/26 PEA Builders Inc.
W195 S7548 Woodland Pl.,
Muskego, WI 53150
Ph: (414) 324-6123
SStteevvee && MMaarryy HHoommaa
99775511 WWaatteerr SStt..
EEpphhrraaiimm,, WWII 5544221111
PPhh ((441144)) 332244--66112233
#/#" = 1'-0"
DATE REVISED:
DRAWN BY:
SH & LK
A-1.1
CONCEPTUAL DWGS
7.17.26
1
Brent Bristol
From: Doug Evans <
Sent: Thursday, July 16, 2026 1:56 PM
To: Brent Bristol
Subject: Brookside Lane - Cottage #1 - Studio
Hi Brent, all my cottages need to have their roofs replaced as soon as possible, so I’d like to approach my
renovation project differently than we discussed.
I’m good with keeping all the cottages closer to their current design and size, but I would like to make some
improvements while completing the roof repairs if possible.
Otherwise, I may have to rip off a brand new roof if I go back to make improvements later.
I’ve attached a new narrative, a current picture, a concept picture, and building plans that have my adjustments.
This is the smallest cottage which has no variance concerns due to proximity to boundary or water.
Current Picture:
SCALE1"•30'
PLAT OF SURVEY
BElNG A PA'll' OF GOV£RNMEt<T LOT 2,
SECTION 23, TOWNSlilP 31 NORTli, RA.�GE 27 EAST,
VILLAGE OF EPHRAIM, DOOR COUNTY, WISCONSIN
...........
EAST 2'!,0.7'+/-
210.10' � • I •
w ,.. t:..... .,,. r-----------
�//��
I / • /I/ / is I I /
/ I / /
/ I I /
I I II I I
,' t l 1
I
_ _.,
11 I
/ I I I
I '"""' I f I 1 I I I I \....,-\ I I I / I I I
',,,.. pGrCel conta.ns o-<1o.l:,� I / I
I
I
I
I
I
I
I
I
I
I
'€, I
·�\ I
-.. t.(,(h·/-OCr"U I / /
', I/ I
' - .,..,.-1 I ', --- I I
, I I
\ I I' _..... J / \ I I \ I I
\ , El
I I .,.
\ __ 1-'· --,
I I
--- i I '"'""
I
I
I
.
ntt.11Jlt \ , I
I
I
I
I
I
I
I
II I
I
I
•
1!12.6 3'
v,m 172.6'+/-
,,.
I
l,WBS k ROBIN LINDSLOOJ.1400 'l:ut RANDOLPH UNtr ui3 CRCCACO, lL 80601
...,...,, PE.'f!NSUU L\NI> co=TANTS. I.LC. 824D EGG KARBOR ROAD SnlRGEON' UAY. WI $423S
"'0 �
-
!!:!>
�
I I
i!
I
I
"'
l
IC, I5 0 I§
0 M I
r I
:,,
Iz
�
I
I
tc,i 1/4 ccrn.,r$0�. 2.r:11-21
iII.J m 0 I + • OOOR ecuwrr MOHUWtm8' ♦ • CXIST�O 1/2.' IRON PFE�1 � t NI �lo-�, 1kt to the �tb-1 CO!"'!III' .,,, O:'ld tt.t cer.t�lfll• liocctbll ot SIOOlit'c"t l.cl'• .... 1. ulcbllthtd o• per p,-o'4c,..1t reittr •KV•.,,.
.I \i\'ttr�f!d rno ello""' •-u!ob� l:ly -, �.
Ccn �fldtr le"I.. Vo�d� Lwrl �• Teen,9,
"II
"
ii [ = J • 11,ll.Dff> Zet.t """' . 'f' 8vJ:leO •-doPlol..d -t,o-.., "'""i -� .if+ct .;t llmt <ff ,_r,n-.0 0"'1 tr,o,;1,1 l'll)l t,. telt4 •"" d!',o,Jt lll'fl. «tlo,.-.,1lrfl\'\fll Wllfk:,S,'0,t ll't--1 �"' �-v.llop, �l Of Qli't'd"', .,.,
L ______ �t,\ ______ J
O�t
eoi.:;;
N e.'759"J7• W
ors:,�PTiON: A i:on:d ef fond btl19 o r:<1rt cf Co1'tl'l'lmt11t Lot 2, Section 23. 10•11.shl,, J1 �•,orth,Ao11agc 21 Ectt. "11!1119, of t,)11rorn. Co�r CCunty, 'ftl,con,l'I more pO"U::11lory u.orbt4 ot,011¢ .. 1: Comme.r.ch9 ct U·.o Ec,t 1/4 coen,r of sold St<:Ucn 23. tht11e. S OO'CO'S9'" W --1316.tC> f�l, thcnu H eg-,,i•3t• W --13",59 f .. t to the SC COMtr cf ,old Go ... cmmtnlLot 2, thcnc• Nortl\ -.. 513.15 , .. t cloflg th• &3tt i:n, or ,cid CO">�mmcnt Lot 2, ,aid llnt o:»:i being ttlc ctl\lcrtlt10 of Srcol<.ticl♦ Lot!&. U'!etiee •.-·ut -- 2� fttl to th• ;iohtof W;!nt1lt19 of lon<lt t:, 3t �--¢'bed; ll\e,,c. !x,uU, -- 300,00 feet. thcr.ce 'lli'nt -l52.60 ful too t,c,'1'1l btlr.g Ectt .. _ 20+/-fo11t from '.h1 ee.,t1.· of [phroffl C1uk, t.;.,c11,:c N 10-5'1'� W --�5.57 tut CIO"IQ o n,ecnccr lhe lo o pMt being £est --20•/-fN:t ft'Ot'I\ 11',1 eentor of [pllroin Crec'I. thenee Eo,t -210.70 feet to l'I• ;olrltor 11eglnnl19. Seid �orctl <tl'ltO:-rs l,68t/ ... o::rn, Including o.1 lo11ds l)fa9 llchottn ofore,<11.l r.'lt<l�cftt line o�d th, c:1nttor ot [p?lro!m Creek bcto,un ,Ide lot ihu oJCtffldM o, �(!:1:rU:1e-:I, lot;ctn« •I� O'I eostmen� ow•tfl'l•nt ot CS.tcttltcl I� �him, IC<:8, R�ord,._pot;o 71-78,
9JWKO attAC«S (CS}"°''SlTt..ot: -IOn:n S.US'ftl-1fl'ltt ¢IGlc f"'I'\ ,t<;t-, TS IUl
'NOV, 1 .5 20"6
/'J/• D/-')'j)f)J
(-J,.fvJ
,.
9807 Brookside Lane, Ephraim
• Repair Cottage #1 – Studio
o Square footage (16’ x 16’)
• Remove existing roof and replace with a new steel 7-12 pitch gable roof.
• Remove existing porch and replace with a 16’ wide x 6’ deep covered deck.
o Deck roof will be extension from newly installed roof.
• Increase height of all existing walls from current 7’ height to 9’ height.
• Add loft to back portion of the cottage using engineered truss system.
o Access to loft will be a permanently installed ladder.
Contact Info:
Doug Evans
Cell:
gmail.com
1
Brent Bristol
From: Doug Evans <
Sent: Friday, July 24, 2026 9:20 AM
To: Brent Bristol
Subject: Re: Brookside Lane - Cottage #1 - Studio
Attachments: IMG_1461.jpeg; IMG_1457.jpeg
Here are a couple additional pictures of what I would have in mind for the other two cottages. I would
provide blueprint/plans for all 3 cottages prior to submitting permit.
The work on each cottage would be similar to cottage #1.
1) Remove exiting roofing structure
2) Extend walls up from 7 foot to 9 foot
3) Install new floor truss system
4) Install new roof with higher pitch than existing
5) Replace porch
No increase in primary foundation footprint
Increase in porch size in front portion of cottages only.
Thanks again,
Doug
On Fri, Jul 24, 2026 at 8:52 AM Brent Bristol < wrote:
Ok, great!
So, on the new plans and submittals the plans for cottage 1 are clear. On the other two you speak to
making some improvements in making the roof repairs/changes. Do you have any concepts of what
those changes/improvements would be?
Sincerely,
Brent Bristol
Source: Village of Ephraim website. First collected Oct 10, 2026.