VILLAGE OF EPHRAIM
GREEN TIER AD-HOC COMMITTEE WORKING SESSION MINUTES
THURSDAY, JULY 2, 2026 - 9:00 AM - 9996 WATER STREET
Present: Bruce Nelson, Cindy Nelson, Sophie Nelson, and Carly Mulliken - Chair.
Absent: Jeff Lutsey, Lane Methner, and Zoe Sanders.
Staff: Brent Bristol – Village Administrator and Kim Roberts – Deputy Clerk.
1. Update on Wetlands Signage Project:
The Committee received an update on the progress of the Wetlands Signage Project. C. Nelson reported that
the previous Sunday, volunteers had cleared some brush along the path. The Village maintenance crew had
addressed three (3) separate areas requiring tree removal. C. Nelson noted that two (2) older sign poles were
too difficult to remove. They were left in the ground and will require continued work on extraction over
time. Two (2) existing signs were also identified as still appropriate and were intentionally left in place.
C. Nelson noted the contractor was ready to return to install directional signage, but had been waiting for the
path to be cleared from the downed trees. She committed to emailing the contractor to let her know the area
was now ready. A sign acknowledging donors was also noted as still forthcoming.
On the topic of mulching, the Committee discussed the best timing. It was generally agreed that mulching in
the cool season would be preferable, with late fall identified as probably the best time, though there was
acknowledgment that spring mulching would look freshest for the season. C. Nelson noted that while some
sections of the path remain in good condition, others would benefit from fresh mulch and that it is always
easier to maintain than to let it go.
The sign designs themselves received positive remarks from members of the Committee. They were
described as featuring a steel plate design angled upward, with butterfly cut-outs in steel, and positioned low
enough to be accessible and readable by children. Members expressed enthusiasm about the quality of the
design work. Once all signage is fully installed, the Committee agreed that an announcement should be sent
out to the community highlighting that the wetlands area has been refreshed and is ready to be enjoyed.
2. Discussion and Consideration Regarding Plans for Community Clean-Up Day and Tree Giveaway:
The Committee conducted a debrief on the most recent Community Clean-up Day. Key figures reported
included seventy-two (72) trees given away, eight (8) bags of garbage collected, ten (10) pounds of batteries
recycled, and approximately fifteen (15) participants.
C. Nelson raised the question of whether to continue the tree giveaway in future years, noting that
participation numbers have been declining. The observation was made that trees are now being given away
broadly across the county — by churches, community organizations, and others — which has reduced the
demand at the Village's own event. The Committee did not reach a firm conclusion but acknowledged it was
worth revisiting in the spring, weighing whether the tree giveaway program still serves its purpose or should
be adapted.
The discussion also touched on a related idea: Whether trees or plants could be given to a dedicated planting
area within the village, rather than to individual residents. It was noted that this option had been explored
before in correspondence with Lutsey, but that a suitable location within Ephraim had never been identified.
Regarding logistics, C. Nelson noted informally that donuts had not been popular and suggested future
events offer baked goods such as bars or cookies instead, as those had been better received. Coffee was
well-consumed. The timing of the event on Mother's Day weekend was briefly discussed. It was noted that
the date had been chosen based on calendar availability rather than intent, and that participation numbers
held relatively steady compared to the prior year. The Committee expressed mild uncertainty about whether
the Mother's Day timing was optimal and left the question open for future consideration when scheduling.
3. Update on Water Bottle Filling Station:
The Committee received an update on the three (3) water filling stations. The station at the Visitor Center
and the station at the marina were confirmed as installed and operational. The beach station was still
pending installation, with the contractor indicating that work was expected to begin the following Monday.
B. Nelson reported that the contractor had been under the impression the treatment system was to be
installed at the beach, when in fact the contract clearly specified it was to be installed at the Visitor Center.
Upon visiting the Visitor Center, B. Nelson was unable to confirm whether the system had been installed, as
access to the mechanical room was unavailable. It was also observed that the appearance of the old unit at
the Visitor Center had been notably poor due to rust and discoloration, making it all the more important that
the new system be properly situated.
B. Nelson noted that the marina station had already registered 102 bottles saved, though it was humorously
acknowledged that the first seven of those were test counts by MacDonald to verify the counter was
functioning. The Committee expressed some regret that the beach station had not been completed in time for
the Fourth of July holiday week, as it would have provided an immediate impact in reducing single-use
plastic bottle consumption during a high-traffic and high-temperature period. A follow-up with MacDonald
regarding both the beach installation timeline and the treatment system location was committed to by
Mulliken.
4. Next meeting:
The Committee scheduled its next meeting for August 6, 2026, at 9:00 AM
The Committee briefly discussed several ongoing matters. It was suggested that the topic of a fast electric
vehicle charger, previously identified as a goal for the year, be placed on next month's agenda. The
Committee also received an update on a goose roundup that had recently taken place, as well as Moravia
Point.
C. Nelson raised the matter of the solar for the Wastewater Treatment Plant, expressing concern that the
Village Board had continued to defer action and that further delay risked losing the opportunity altogether.
Discussion touched on whether the existing engineering documentation from McMahon would be sufficient
to support a grant application.
The meeting adjourned at 9:22 AM.
Recorded by Kim Roberts – Deputy Clerk