VILLAGE OF EPHRAIM
FOUNDED 1853
VILLAGE OF EPHRAIM
FOUNDED 1853
Was
tewater Committee Agenda
Monday, June 1st, 2026, 9:00 AM
Village Hall 9996 Water Street
NOTE: This Meeting of the Village Wastewater Committee will also be held via teleconferencing. It will be
available to the public to attend in person or by computer, phone, tablet, or dial-in. Connection information
is included below in this notice.
1. Call to order
2. Changes in Agenda
3. Previous minutes May 11th, 2026
4. Visitors’ comments
5. Ephraim Wastewater Operator in Charge Report.
6. Discussion and consideration of the 2025 WI DNR eCMAR report.
7. Discussion and consideration of resolution 02-2026 - Wisconsin Department of Natural
Resources, Wisc. Admin. Code NR 208 – Compliance Maintenance Resolution.
8. Visitors’ comments
9. New business for next meeting
10. Adjournment
WW Meeting
Jun 1, 2026, 9:00 – 11:00 A
M (America/Chicago)
Please join my meeting from your computer, tablet or smartphone.
htt
ps://meet.goto.com/701935477
Y
ou can also dial in using your phone.
Access Code: 701-935-477
United States: +1 (571) 317-3122
*It is possible that a quorum of the Village Board or other Village Committees may be present at the meeting.
However, no action will be taken by any other Board or Committee unless specifically noticed.
Date 5/29/2026
X Village Administrative Office
X Visitors’ Center
X Post Office
X Website www.ephraim-wisconsin.com
X Emailed to WDOR/Peninsula Pulse
Andrea Collak, Clerk
Kim Roberts, Deputy Clerk
Wastewater Committee Minutes
Monday, May 11, 2026, 9:00 AM
Present: Karen McMurtry- Chair, Rick Hoyerman, Bruce Nelson, Jim Peterman
Absent: Dennis Jewell
Staff: Brad Rasmusson – Wastewater Manager/Operator in Charge, Kim Roberts – Deputy
Clerk/Utility Clerk, Brent Bristol-Administrator
Online: Andrea Collak – Clerk/Treasurer, Daniel Oakley – Wastewater Operator
1. Call to order: The meeting was called to order by Chair - McMurtry and a quorum was
present for this meeting.
2. Changes in Agenda: None
3. Previous minutes – Minutes from April 6, 2026
Peterman moved, McMurtry seconded to approve April 6, 2026, meeting minutes as
presented, all ayes, and the motion carried.
4. Visitors’ comments: None
5. Ephraim Plant Manager Report:
Rasmusson reviewed the WW, WWT, and SS OIC reports as included in the agenda packet.
Wastewater duties were completed according to schedule.
Rasmusson noted that the Wastewater Department installed UV system and started up without
any issues.
They set up trash pump at lift 1 in preparation for possible backups due to high flows during rain
and snow melting. Fortunately, they never used it. We did have 345,000 gallons flow through the
plant within a 24-hour period.
They spent several days looking for sources of infiltration. Great Lakes TV & Seal came on-site for
two days with their camera truck. 5 leaking manholes were found, 4 have been repaired already, 1
sump pump connected to the sewer which has been shut off, and about 6 cracked or broken laterals.
Rasmusson has been in contact with most of them and repairs are in the process.
The sewer flushing was completed. They will be scheduling the lift stations cleaning.
They sent out all the required effluent samples for our discharge permit renewal and will hopefully
finish the renewal process soon.
Also, annual sludge characteristics test along with PFAS test required by Sturgeon Bay for their
permit renewal.
Ephraim Well Water Testing: Year to Date
Number of Water Tests: 147 304
In-House Bacteria: 107 262
Clean Water Testing: 40 42
Ephraim Septage Service: Year to Date
Holding Tank Pump Outs: 4 9
Septic Pump Outs/Inspections:
Emergency Call Ins:
VILLAGE OF EPHRAIM
FOUNDED 1853
Wastewater Committee Minutes
May 11, 2026
Page 2 of 5
6. Discussion regarding residential REU rate structure
McMurtry introduced this agenda item by acknowledging the extensive work that had been put
into the analysis and invited Deputy Clerk Kim Roberts to present the proposed residential REU
rate structure framework to the committee.
Deputy Clerk Roberts opened by framing the discussion as a starting point for conversation,
emphasizing that the committee was not yet talking about rates — only about the methodology
for assigning Residential Equivalency Units (REUs). She explained that the current system
assigns flat 1 REU to all residential properties in the Village, based on an assumed 300 gallons
per day, regardless of home size. After months of research and analysis, she concluded that this
approach no longer reflects equitable service access across the Village's varying residential
properties.
Roberts presented the proposed methodology, which is grounded in Wisconsin Standardized
Plumbing Code SPS 383 — the same code used to design on-site wastewater systems. Under
this standard, flow is calculated at 150 gallons per day per bedroom, based on the assumption of
two occupants per bedroom, each averaging 50 gallons per day, with a 1.5 safety factor applied.
Using this methodology, the existing 300 gallons per day baseline was determined to be
appropriate only for 1- to 2-bedroom homes — meaning the current flat-rate assignment has
likely been under-assigning REUs for larger properties for years.
Roberts described the extensive database that had been constructed to support this work,
drawing on the municipal assessor's records, property files, real estate listings, short-term rental
license applications, and plan committee records — including, in some cases, building plans
reviewed to confirm bedroom counts. She noted with some humor that the resulting binder was
"too heavy" to bring to the meeting.
Proposed Rate Structure
The proposed framework assigns REUs on a sliding scale, increasing by one-half REU with
each additional bedroom beyond the first two:
• 1–2 bedrooms (or studio): 1.0 REU / 300 gallons per day
• 3 bedrooms: 1.5 REUs / 450 gallons per day
• 4 bedrooms: 2.0 REUs / 600 gallons per day
• And so on, with each additional bedroom adding 0.5 REU
Roberts presented sample comparisons using Water Street properties, illustrating current versus
proposed REU assignments alongside current and projected quarterly and annual billing at the
existing rate of $150 per REU, along with the resulting percentage change.
Multiple Structures and Condo Associations
Roberts addressed how properties with multiple structures would be handled: each structure on a
parcel would receive its own REU assignment based on its bedroom count, and those would be
totaled for the parcel. She illustrated an example where one structure had three bedrooms (1.5
Wastewater Committee Minutes
May 11, 2026
Page 3 of 5
REUs) and a second had two bedrooms (1.0 REU), yielding a combined parcel assignment of 2.5
REUs.
She also presented an example of a condominium association that had historically been assigned
a blended REU figure of 6.46 REUs, whereas under the proposed framework, each individual
unit within the association would be assigned its own REU based on bedroom count. Roberts
noted that in the past, similar properties had been handled inconsistently, and the new framework
would create uniformity across the board.
The discussion that followed was substantive and largely supportive of the proposed approach.
Peterman expressed strong enthusiasm, noting that a well-classified, data-driven system
eliminates the need for subjective annual catch-up and ensures that every property owner pays a
fair share. He acknowledged the real-world complexity of the issue, sharing that he had even
fielded inquiries from property owners wishing to run sewer lines to garages with upstairs
bedrooms — a scenario that carries significant compliance implications. He stressed that with a
defensible, standardized system in place, the committee need not apologize for rate changes: "If
we're behind on our schedule, then this is what you have to pay."
Hoyerman thanked Roberts for the work, characterizing it as "way above and beyond," and then
raised a series of clarifying questions. Hoyerman asked how zero-bedroom structures (e.g., sheds
or garages connected to sewer) would be handled; Roberts confirmed that the defining factor is
whether the structure is connected to the sewer system — if connected, it receives at minimum a
1 REU assignment. Hoyerman then asked how bedroom counts would be determined and
verified. Roberts explained that the assessor assigns bedroom counts during property valuation,
often estimating from exterior square footage, but that her research process had involved a back-
and-forth exchange with the assessor, in many cases updating his records based on STR license
applications, personal property files, and real estate listings. Hoyerman acknowledged that
disputes from homeowners who disagree with their bedroom count would ultimately be a matter
for the homeowner to resolve with the assessor. He concluded by asking whether Roberts had
encountered any rate structures in her research that used a declining marginal increment —
where, for example, the value assigned per additional bedroom decreases at higher counts.
Roberts indicated she had not seen any such models; she emphasized that the goal is to ensure
sufficient revenue to meet the financial demands of the treatment facility, and that flat
incremental increases are the prevailing approach.
Nelson raised the question of seasonality, noting that many homes in Ephraim are seasonal-use
properties. McMurtry confirmed that the village's ordinance already addresses this and that
seasonal-use objections had previously been raised and addressed — the connection to the
system is the determining factor, not frequency of use. Nelson also asked where the 150 gallons
per day per bedroom figure originated. Roberts confirmed it derives from Wisconsin
Standardized Plumbing Code SPS 383, describing it as a "very good methodology" because it is
the same standard used for designing the systems that generate the discharge. Nelson confirmed
that this made the standard "defendable."
Rasmusson confirmed that he had been using Roberts' research to investigate specific properties
— she had provided him with a list of structures that might be connected but were not currently
on the billing rolls. He noted that two such properties had already been identified. Roberts
acknowledged there remain additional properties where it is still unclear whether secondary
Wastewater Committee Minutes
May 11, 2026
Page 4 of 5
structures are actively connected to the sewer, and that this would need to be resolved before
finalizing assignments.
Peterman raised a philosophical question about whether the proposed assignment accurately
captures actual usage — noting, for example, that an older couple in a 4-bedroom home is likely
to discharge far less than a full occupancy. Roberts addressed this directly and without
hesitation: the property could be sold, and the new owners might use it as a rental or bed-and-
breakfast. The REU assignment follows the property, not the occupants. Roberts summarized:
"It's factual. How many bedrooms do you have? How many connections do you have? And it
doesn't change how you're using the properties." This approach was well received by the
committee members as being both transparent and easy for residents to understand.
Nelson observed that under this framework, the number of addresses or structures on a parcel
becomes irrelevant — only the total bedroom count across all connected structures matters.
Roberts confirmed this, noting that it significantly simplifies administration.
McMurtry asked what the committee needed to formally do at this meeting. Roberts indicated
that a formal motion was not necessary — a consensus to continue down this path would be
sufficient. Once the full residential analysis is complete and commercial REU assignments are
developed, the full package will be returned to the committee, at which point rates could be
evaluated with the auditor.
Roberts indicated she was approximately 65–70% complete with the commercial REU analysis.
McMurtry explained that she had intentionally withheld asking Roberts to invest further time in
commercial analysis until the committee had reviewed and accepted the residential framework
— to avoid compounding her effort if the approach were to be rejected.
Hoyerman suggested that when the matter eventually comes forward for formal action, the
committee should present residential and commercial together as a single recommendation to the
Village Board, rather than in pieces. He acknowledged his preference was partly practical — as a
Board member, he would rather receive it all at once.
Regarding the commercial methodology, Bristol noted that the bedroom-based methodology
would naturally carry over to lodging-type commercial properties such as hotels and motels, but
that restaurants, retail, and other uses would require a different approach. The use of established
metrics — rather than village-created formulas — was highlighted as a strength. The comment
was made that while a metric can be challenged, using a code-based standard is "totally
defendable." The committee consensus was to continue developing the commercial analysis.
The Chair, McMurtry and committee members thanked Roberts warmly for her work, with one
member describing the effort as "a project" requiring "a lot of time."
7. Visitors’ comments: None
8. New business for the next meeting:
McMurtry raised the pending engineering questions submitted to McMahon Engineering.
Rasmusson noted he had not yet received responses
Bristol added that the inquiry he sent to McMahon centered on clarifying the current state of the
wastewater improvement project phasing, specifically with respect to the solar component: what
work had already been paid for, what remains, and whether solar could move forward as a
Wastewater Committee Minutes
May 11, 2026
Page 5 of 5
standalone submission for Clean Water Fund financing independent of any larger project bundle.
Bristol noted that as of the meeting, no final decision had been made on whether to bundle all
improvements for a 2027 application or to resubmit the solar component as a standalone Phase 1
for 2027. He expressed some frustration that clarity had been elusive, noting there had previously
been "some confusion with dates" related to the solar timeline.
Key open questions communicated to the engineer included: whether solar engineering was
sufficiently complete to go to bid; what costs remain; what the lead times are for various
components; and what specific work had already been paid for versus what would need
additional expenditure. Bristol noted that the 2027 Clean Water Fund application deadline falls
in September, making timelines important to nail down. He acknowledged that the engineer had
not yet responded but had apparently been asked "some decent questions."
Rasmusson indicated he would also follow up on permit applications concurrently.
The next meeting was set for June 1, 2026.
9. Adjournment
McMurtry moved, Hoyerman seconded to adjourn the meeting, all ayes, and the motion
carried.
Recorded by Andrea Collak - Clerk/Treasurer
May 2026
Ephraim WW, WWT, SS
Manager OIC Report
EFF samples sent to Northern Lake Services for ammonia testing:
Ph testing: Five times per week as required.
TSS, BOD, Po4, labs with lab cleanup: Twice per week as required.
Eff E-coli test, this must be done May-October once per week while running disinfection.
• Sent out, completed, and submitted 2026 sludge characteristics test.
• Great Lakes TV & Seal cleaned the lift stations. We again used a dewatering bag to dump
the waste into then hauled and dumped at GFL.
• Sent out more effluent samples for permit renewal testing. Almost done, we will submit
once testing is completed.
• We conducted interviews and hired Nathan Merkle for the summer season, welcome
aboard.
• Gathered and entered data for ECMAR.
• Removed North Shore Rd. winter SOP equipment.
• Assisted the maintenance department with assembling and installing flags for streetlights.
Ephraim Well Water Testing Year to Date
Number of Water Tests: 172 476
In-House Bacteria: 159 421
Clean Water Testing: 13 55
Ephraim Septage Service:
Holding Tank Pump Outs: 7 16
Septic Pump Outs / Inspections:
Emergency Call Ins:
Weather:
Precip: 2.45 16.26
Max Temp: 84 84
Min Temp: 31 -17
Respectfully submitted,
Brad Rasmusson
Village of Ephraim
Wastewater Manager
Updates for June meeting
Sludge
2026 Sludge characteristics have been completed along with PFOS testing required by
Sturgeon Bay.
Permit
We are continuing to work on our permit renewal process; we have one more effluent
sample to take which we will take on Monday. Once we receive the results I will enter and
submit the permit and wait for the DNR’s approval. There could be some new requirements
or testing with the new permit.
McMahon
We received a quote from McMahon to update the facility plan amendment to include solar
for $5,000 to $10,000 so that it could be included in phase 1. McMahon’s plan is to
resubmit phase 1 in September as it stands. We will find out around January if we would
receive principal forgiveness on phase 1 for 2027 which is doubtful. I believe that if we were
to receive the 2.1 million principal forgiveness, we would then scramble a bit to figure out
how to complete phase 1 in 2027. Once we get to January, we will hopefully have answer
from the DNR about the clean water funding and have our REU system restructured and
planning for the future.
Around January if we do not receive principal forgiveness, we can then decide how to
combine phases 1 & 2 into a single project with a timeline for completion and whether to
include solar or have it be a stand-alone project financed through other means.
We can discuss any of these at the meeting.
Thank You,
Brad
Compliance Maintenance Annual Report
Ephraim Wastewater Treatment Facility Last Updated: Reporting For:
5/14/2026 2025
Influent Flow and Loading
1. Monthly Average Flows and BOD Loadings
1.1 Verify the following monthly flows and BOD loadings to your facility.
Influent No.
703
Influent Monthly
Average Flow, MGD
x Influent Monthly
Average BOD
Concentration mg/L
x 8.34 = Influent Monthly
Average BOD
Loading, lbs/day
January 0.0317 x 97 x 8.34 = 26
February 0.0273 x 100 x 8.34 = 23
March 0.0823 x 52 x 8.34 = 35
April 0.1125 x 76 x 8.34 = 71
May 0.1075 x 143 x 8.34 = 128
June 0.1404 x 214 x 8.34 = 251
July 0.1728 x 216 x 8.34 = 311
August 0.1297 x 204 x 8.34 = 221
September 0.0835 x 210 x 8.34 = 146
October 0.0723 x 314 x 8.34 = 190
November 0.0371 x 179 x 8.34 = 55
December 0.0349 x 145 x 8.34 = 42
2. Maximum Monthly Design Flow and Design BOD Loading
2.1 Verify the design flow and loading for your facility.
Design Design Factor x % = % of Design
Max Month Design Flow, MGD .62 x 90 = 0.558
x 100 = .62
Design BOD, lbs/day 2073 x 90 = 1865.7
x 100 = 2073
2.2 Verify the number of times the flow and BOD exceeded 90% or 100% of design, points earned,
and score:
Months
of
Influent
Number of times
flow was greater
than 90% of
Number of times
flow was greater
than 100% of
Number of times
BOD was greater
than 90% of design
Number of times
BOD was greater
than 100% of design
January 1 0 0 0 0
February 1 0 0 0 0
March 1 0 0 0 0
April 1 0 0 0 0
May 1 0 0 0 0
June 1 0 0 0 0
July 1 0 0 0 0
August 1 0 0 0 0
September 1 0 0 0 0
October 1 0 0 0 0
November 1 0 0 0 0
December 1 0 0 0 0
Points per each 2 1 3 2
Exceedances 0 0 0 0
Points 0 0 0 0
Total Number of Points 0
0
Compliance Maintenance Annual Report
Ephraim Wastewater Treatment Facility Last Updated: Reporting For:
5/14/2026 2025
3. Flow Meter
3.1 Was the influent flow meter calibrated in the last year?
Yes Enter last calibration date (MM/DD/YYYY)
2025-04-11
No
If No, please explain:
4. Sewer Use Ordinance
4.1 Did your community have a sewer use ordinance that limited or prohibited the discharge of
excessive conventional pollutants ((C)BOD, SS, or pH) or toxic substances to the sewer from
industries, commercial users, hauled waste, or residences?
Yes
No
If No, please explain:
4.2 Was it necessary to enforce the ordinance?
Yes
No
If Yes, please explain:
5. Septage Receiving
5.1 Did you have requests to receive septage at your facility?
Septic Tanks Holding Tanks Grease Traps
Yes Yes Yes
No No No
5.2 Did you receive septage at your facility? If yes, indicate volume in gallons.
Septic Tanks
Yes 57,210 gallons
No
Holding Tanks
Yes 2,322,450 gallons
No
Grease Traps
Yes gallons
No
5.2.1 If yes to any of the above, please explain if plant performance is affected when receiving
any of these wastes.
Did not affect performance of treatment plant
6. Pretreatment
6.1 Did your facility experience operational problems, permit violations, biosolids quality concerns,
or hazardous situations in the sewer system or treatment plant that were attributable to
commercial or industrial discharges in the last year?
Yes
No
If yes, describe the situation and your community's response.
6.2 Did your facility accept hauled industrial wastes, landfill leachate, etc.?
Compliance Maintenance Annual Report
Ephraim Wastewater Treatment Facility Last Updated: Reporting For:
5/14/2026 2025
Yes
No
If yes, describe the types of wastes received and any procedures or other restrictions that were
in place to protect the facility from the discharge of hauled industrial wastes.
Total Points Generated 0
Score (100 - Total Points Generated) 100
Section Grade A
Compliance Maintenance Annual Report
Ephraim Wastewater Treatment Facility Last Updated: Reporting For:
5/14/2026 2025
Effluent Quality and Plant Performance (BOD/CBOD)
1. Effluent (C)BOD Results
1.1 Verify the following monthly average effluent values, exceedances, and points for BOD or
CBOD
Outfall No.
001
Monthly
Average
Limit (mg/L)
90% of
Permit Limit
> 10 (mg/L)
Effluent Monthly
Average (mg/L)
Months of
Discharge
with a Limit
Permit Limit
Exceedance
90% Permit
Limit
Exceedance
January 30 27 3 1 0 0
February 30 27 3 1 0 0
March 30 27 4 1 0 0
April 30 27 5 1 0 0
May 30 27 5 1 0 0
June 30 27 5 1 0 0
July 30 27 6 1 0 0
August 30 27 3 1 0 0
September 30 27 3 1 0 0
October 30 27 3 1 0 0
November 30 27 3 1 0 0
December 30 27 3 1 0 0
* Equals limit if limit is <= 10
Months of discharge/yr 12
Points per each exceedance with 12 months of discharge 7 3
Exceedances 0 0
Points 0 0
Total number of points 0
NOTE: For systems that discharge intermittently to state waters, the points per monthly
exceedance for this section shall be based upon a multiplication factor of 12 months divided by
the number of months of discharge. Example: For a wastewater facility discharging only 6 months
of the year, the multiplication factor is 12/6 = 2.0
1.2 If any violations occurred, what action was taken to regain compliance?
0
2. Flow Meter Calibration
2.1 Was the effluent flow meter calibrated in the last year?
Yes Enter last calibration date (MM/DD/YYYY)
2025-04-11
No
If No, please explain:
3. Treatment Problems
3.1 What problems, if any, were experienced over the last year that threatened treatment?
None
4. Other Monitoring and Limits
4.1 At any time in the past year was there an exceedance of a permit limit for any other pollutants
such as chlorides, pH, residual chlorine, fecal coliform, or metals?
Yes
No
Compliance Maintenance Annual Report
Ephraim Wastewater Treatment Facility Last Updated: Reporting For:
5/14/2026 2025
If Yes, please explain:
4.2 At any time in the past year was there a failure of an effluent acute or chronic whole effluent
toxicity (WET) test?
Yes
No
If Yes, please explain:
4.3 If the biomonitoring (WET) test did not pass, were steps taken to identify and/or reduce
source(s) of toxicity?
Yes
No
N/A
Please explain unless not applicable:
Total Points Generated 0
Score (100 - Total Points Generated) 100
Section Grade A
Compliance Maintenance Annual Report
Ephraim Wastewater Treatment Facility Last Updated: Reporting For:
5/14/2026 2025
Effluent Quality and Plant Performance (Total Suspended Solids)
1. Effluent Total Suspended Solids Results
1.1 Verify the following monthly average effluent values, exceedances, and points for TSS:
Outfall No.
001
Monthly
Average
Limit (mg/L)
90% of
Permit Limit
>10 (mg/L)
Effluent Monthly
Average (mg/L)
Months of
Discharge
with a Limit
Permit Limit
Exceedance
90% Permit
Limit
Exceedance
January 30 27 10 1 0 0
February 30 27 8 1 0 0
March 30 27 6 1 0 0
April 30 27 10 1 0 0
May 30 27 7 1 0 0
June 30 27 10 1 0 0
July 30 27 10 1 0 0
August 30 27 7 1 0 0
September 30 27 7 1 0 0
October 30 27 6 1 0 0
November 30 27 6 1 0 0
December 30 27 7 1 0 0
* Equals limit if limit is <= 10
Months of Discharge/yr 12
Points per each exceedance with 12 months of discharge: 7 3
Exceedances 0 0
Points 0 0
Total Number of Points 0
NOTE: For systems that discharge intermittently to state waters, the points per monthly
exceedance for this section shall be based upon a multiplication factor of 12 months divided by
the number of months of discharge.
Example: For a wastewater facility discharging only 6 months of the year, the multiplication
factor is 12/6 = 2.0
1.2 If any violations occurred, what action was taken to regain compliance?
0
Total Points Generated 0
Score (100 - Total Points Generated) 100
Section Grade A
Compliance Maintenance Annual Report
Ephraim Wastewater Treatment Facility Last Updated: Reporting For:
5/14/2026 2025
Effluent Quality and Plant Performance (Ammonia - NH3)
1. Effluent Ammonia Results
1.1 Verify the following monthly and weekly average effluent values, exceedances and points for
ammonia
Outfall No.
001
Monthly
Average
NH3
Limit
(mg/L)
Weekly
Average
NH3
Limit
(mg/L)
Effluent
Monthly
Average
NH3
(mg/L)
Monthly
Permit
Limit
Exceed
ance
Effluent
Weekly
Average
for Week
1
Effluent
Weekly
Average
for Week
2
Effluent
Weekly
Average
for Week
3
Effluent
Weekly
Average
for Week
4
Weekly
Permit
Limit
Exceed
ance
January 18 18 0 0 0 0
February 18 18 .074 0 .074 0
March 18 18 .1 0 .1 0
April 18 18 .65 0 .65 0
May 18 18 .049 0 .049 0
June 18 18 .11 0 .11 0
July 18 18 3.9 0 3.9 0
August 18 18 .099 0 .099 0
September 18 18 0 0 0 0
October 18 18 .076 0 .076 0
November 18 18 .06 0 .06 0
December 18 18 .15 0 .15 0
Points per each exceedance of Monthly average: 10
Exceedances, Monthly: 0
Points: 0
Points per each exceedance of weekly average (when there is no monthly average):2.5
Exceedances, Weekly: 0
Points: 0
Total Number of Points 0
NOTE: Limit exceedances are considered for monthly OR weekly averages but not both. When a
monthly average limit exists it will be used to determine exceedances and generate points. This
will be true even if a weekly limit also exists. When a weekly average limit exists and a monthly
limit does not exist, the weekly limit will be used to determine exceedances and generate points.
1.2 If any violations occurred, what action was taken to regain compliance?
0
Total Points Generated 0
Score (100 - Total Points Generated) 100
Section Grade A
Compliance Maintenance Annual Report
Ephraim Wastewater Treatment Facility Last Updated: Reporting For:
5/14/2026 2025
Effluent Quality and Plant Performance (Phosphorus)
1. Effluent Phosphorus Results
1.1 Verify the following monthly average effluent values, exceedances, and points for Phosphorus
Outfall No. 001 Monthly Average
phosphorus Limit
(mg/L)
Effluent Monthly
Average phosphorus
(mg/L)
Months of
Discharge with a
Limit
Permit Limit
Exceedance
January .6 0.207 1 0
February .6 0.127 1 0
March .6 0.151 1 0
April .6 0.210 1 0
May .6 0.238 1 0
June .6 0.483 1 0
July .6 0.469 1 0
August .6 0.222 1 0
September .6 0.260 1 0
October .6 0.266 1 0
November .6 0.181 1 0
December .6 0.184 1 0
Months of Discharge/yr 12
Points per each exceedance with 12 months of discharge: 10
Exceedances 0
Total Number of Points 0
NOTE: For systems that discharge intermittently to waters of the state, the points per monthly
exceedance for this section shall be based upon a multiplication factor of 12 months divided by
the number of months of discharge.
Example: For a wastewater facility discharging only 6 months of the year, the multiplication factor
is 12/6 = 2.0
1.2 If any violations occurred, what action was taken to regain compliance?
0
Total Points Generated 0
Score (100 - Total Points Generated) 100
Section Grade A
Compliance Maintenance Annual Report
Ephraim Wastewater Treatment Facility Last Updated: Reporting For:
5/14/2026 2025
Biosolids Quality and Management
1. Biosolids Use/Disposal
1.1 How did you use or dispose of your biosolids? (Check all that apply)
Land applied under your permit
Publicly Distributed Exceptional Quality Biosolids
Hauled to another permitted facility
Landfilled
Incinerated
Other
NOTE: If you did not remove biosolids from your system, please describe your system type such
as lagoons, reed beds, recirculating sand filters, etc.
1.1.1 If you checked Other, please describe:
3. Biosolids Metals
Number of biosolids outfalls in your WPDES permit:
3.1 For each outfall tested, verify the biosolids metal quality values for your facility during the last
calendar year.
Outfall No. 002 - Liquid Sludge
Parameter 80%
of
Limit
H.Q.
Limit
Ceiling
Limit
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 80%
Value
High
Quality
Ceiling
Arsenic 41 75 <13 0 0
Cadmium 39 85 .38 0 0
Copper 1500 4300 350 0 0
Lead 300 840 <10 0 0
Mercury 17 57 <.4 0 0
Molybdenum 60 75 3.5 0 0
Nickel 336 420 <10 0 0
Selenium 80 100 <26 0 0
Zinc 2800 7500 500 0 0
3.1.1 Number of times any of the metals exceeded the high quality limits OR 80% of the limit for
molybdenum, nickel, or selenium = 0
Exceedence Points
0 (0 Points)
1-2 (10 Points)
> 2 (15 Points)
3.1.2 If you exceeded the high quality limits, did you cumulatively track the metals loading at
each land application site? (check applicable box)
Yes
No (10 points)
N/A - Did not exceed limits or no HQ limit applies (0 points)
N/A - Did not land apply biosolids until limit was met (0 points)
3.1.3 Number of times any of the metals exceeded the ceiling limits = 0
Exceedence Points
0 (0 Points)
1 (10 Points)
> 1 (15 Points)
3.1.4 Were biosolids land applied which exceeded the ceiling limit?
Yes (20 Points)
No (0 Points)
Compliance Maintenance Annual Report
Ephraim Wastewater Treatment Facility Last Updated: Reporting For:
5/14/2026 2025
3.1.5 If any metal limit (high quality or ceiling) was exceeded at any time, what action was taken?
Has the source of the metals been identified?
0
6. Biosolids Storage
6.1 How many days of actual, current biosolids storage capacity did your wastewater treatment
facility have either on-site or off-site?
>= 180 days (0 Points)
150 - 179 days (10 Points)
120 - 149 days (20 Points)
90 - 119 days (30 Points)
< 90 days (40 Points)
N/A (0 Points)
6.2 If you checked N/A above, explain why.
0
7. Issues
7.1 Describe any outstanding biosolids issues with treatment, use or overall management:
Total Points Generated 0
Score (100 - Total Points Generated) 100
Section Grade A
Compliance Maintenance Annual Report
Ephraim Wastewater Treatment Facility Last Updated: Reporting For:
5/14/2026 2025
Staffing and Preventative Maintenance (All Treatment Plants)
1. Plant Staffing
1.1 Was your wastewater treatment plant adequately staffed last year?
Yes
No
If No, please explain:
Could use more help/staff for:
1.2 Did your wastewater staff have adequate time to properly operate and maintain the plant and
fulfill all wastewater management tasks including recordkeeping?
Yes
No
If No, please explain:
2. Preventative Maintenance
2.1 Did your plant have a documented AND implemented plan for preventative maintenance on
major equipment items?
Yes (Continue with question 2)
No (40 points)
If No, please explain, then go to question 3:
2.2 Did this preventative maintenance program depict frequency of intervals, types of lubrication,
and other tasks necessary for each piece of equipment?
Yes
No (10 points)
2.3 Were these preventative maintenance tasks, as well as major equipment repairs, recorded and
filed so future maintenance problems can be assessed properly?
Yes
Paper file system
Computer system
Both paper and computer system
No (10 points)
0
3. O&M Manual
3.1 Does your plant have a detailed O&M and Manufacturer Equipment Manuals that can be used
as a reference when needed?
Yes
No
4. Overall Maintenance /Repairs
4.1 Rate the overall maintenance of your wastewater plant.
Excellent
Very good
Good
Fair
Poor
Describe your rating:
Quality of maintenance is reflected in efficient plant operations.
Compliance Maintenance Annual Report
Ephraim Wastewater Treatment Facility Last Updated: Reporting For:
5/14/2026 2025
Total Points Generated 0
Score (100 - Total Points Generated) 100
Section Grade A
Compliance Maintenance Annual Report
Ephraim Wastewater Treatment Facility Last Updated: Reporting For:
5/14/2026 2025
Operator Certification and Education
1. Operator-In-Charge
1.1 Did you have a designated operator-in-charge during the report year?
Yes (0 points)
No (20 points)
Name:
BRADLEY A RASMUSSON
Certification No:
33543
0
2. Certification Requirements
2.1 In accordance with Chapter NR 114.56 and 114.57, Wisconsin Administrative Code, what level
and subclass(es) were required for the operator-in-charge (OIC) to operate the wastewater
treatment plant and what level and subclass(es) were held by the operator-in-charge?
Sub
Class
SubClass Description WWTP OIC
Basic OIT Basic Advanced
A1 Suspended Growth Processes X X
A2 Attached Growth Processes
A3 Recirculating Media Filters
A4 Ponds, Lagoons and Natural
A5 Anaerobic Treatment Of Liquid
B Solids Separation X X
C Biological Solids/Sludges X X
P Total Phosphorus X X
N Total Nitrogen
D Disinfection X X
L Laboratory X X
U Unique Treatment Systems
SS Sanitary Sewage Collection X NA X NA
2.2 Was the operator-in-charge certified at the appropriate level and subclass(es) to operate this
plant? (Note: Certification in subclass SS is required 5 years after permit reissuance.)
Yes (0 points)
No (20 points)
2.3 For wastewater treatment facilities with a registered or certified laboratory, is at least one
operator that works in the laboratory certified at the basic level in the laboratory (L) subclass?
Yes
No
N/A – Wastewater treatment facility does not have a registered or certified laboratory
2.4 For wastewater treatment facilities that own and operate a sanitary sewage collection system,
has at least one operator been designated the OIC for sanitary sewage collection system and
certified at the basic level in the sanitary sewage collection system (SS) subclass?
Yes
No
N/A – Owner of the Wastewater treatment facility does not own and operate a sanitary sewage
collection system
0
3. Succession Planning
3.1 In the event of the loss of your designated operator-in-charge, did you have a contingency plan
to ensure the continued proper operation and maintenance of the plant that includes one or more
of the following options (check all that apply)?
One or more additional certified operators on staff
Compliance Maintenance Annual Report
Ephraim Wastewater Treatment Facility Last Updated: Reporting For:
5/14/2026 2025
An arrangement with another certified operator
An arrangement with another community with a certified operator
An operator on staff who has an operator-in-training certificate for your plant and is expected to
be certified within one year
A consultant to serve as your certified operator
None of the above (20 points)
If "None of the above" is selected, please explain:
0
4. Continuing Education Credits
4.1 If you had a designated operator-in-charge, was the operator-in-charge earning Continuing
Education Credits at the following rates?
OIT and Basic Certification:
Averaging 6 or more CECs per year.
Averaging less than 6 CECs per year.
Advanced Certification:
Averaging 8 or more CECs per year.
Averaging less than 8 CECs per year.
Total Points Generated 0
Score (100 - Total Points Generated) 100
Section Grade A
Compliance Maintenance Annual Report
Ephraim Wastewater Treatment Facility Last Updated: Reporting For:
5/14/2026 2025
Financial Management
1. Provider of Financial Information
Name:
Bradley A. Rasmusson
Telephone:
9204210123 (XXX) XXX-XXXX
E-Mail Address
(optional):
brasmusson@ephraim.wi.gov
2. Treatment Works Operating Revenues
2.1 Are User Charges or other revenues sufficient to cover O&M expenses for your wastewater
treatment plant AND/OR collection system ?
Yes (0 points)
No (40 points)
If No, please explain:
2.2 When was the User Charge System or other revenue source(s) last reviewed and/or revised?
Year:
2025
0-2 years ago (0 points)
3 or more years ago (20 points)
N/A (private facility)
2.3 Did you have a special account (e.g., CWFP required segregated Replacement Fund, etc.) or
financial resources available for repairing or replacing equipment for your wastewater treatment
plant and/or collection system?
Yes (0 points)
No (40 points)
0
REPLACEMENT FUNDS [PUBLIC MUNICIPAL FACILITIES SHALL COMPLETE QUESTION 3]
3. Equipment Replacement Funds
3.1 When was the Equipment Replacement Fund last reviewed and/or revised?
Year:
2025
1-2 years ago (0 points)
3 or more years ago (20 points)
N/A
If N/A, please explain:
3.2 Equipment Replacement Fund Activity
3.2.1 Ending Balance Reported on Last Year's CMAR $ 502,696.00
3.2.2 Adjustments - if necessary (e.g. earned interest,
audit correction, withdrawal of excess funds, increase
making up previous shortfall, etc.)
$ 0.00
3.2.3 Adjusted January 1st Beginning Balance $ 502,696.00
3.2.4 Additions to Fund (e.g. portion of User Fee,
earned interest, etc.) + $ 101,266.48
Compliance Maintenance Annual Report
Ephraim Wastewater Treatment Facility Last Updated: Reporting For:
5/14/2026 2025
3.2.5 Subtractions from Fund (e.g., equipment
replacement, major repairs - use description box
3.2.6.1 below*) - $ 10,700.48
3.2.6 Ending Balance as of December 31st for CMAR
Reporting Year $ 593,262.00
All Sources: This ending balance should include all
Equipment Replacement Funds whether held in a
bank account(s), certificate(s) of deposit, etc.
3.2.6.1 Indicate adjustments, equipment purchases, and/or major repairs from 3.2.5 above.
Replacement of generator exhaust fan motor, New collection sampler head, grinder pump,
replaced plant overhead door opener
3.3 What amount should be in your Replacement Fund? $ 265,500.00
Please note: If you had a CWFP loan, this amount was originally based on the Financial
Assistance Agreement (FAA) and should be regularly updated as needed. Further calculation
instructions and an example can be found by clicking the SectionInstructions link under Info
header in the left-side menu.
3.3.1 Is the December 31 Ending Balance in your Replacement Fund above, (#3.2.6) equal to, or
greater than the amount that should be in it (#3.3)?
Yes
No
If No, please explain.
0
4. Future Planning
4.1 During the next ten years, will you be involved in formal planning for upgrading, rehabilitating,
or new construction of your treatment facility or collection system?
Yes - If Yes, please provide major project information, if not already listed below.
No
Project
#
Project Description Estimated
Cost
Approximate
Construction
Year
1 Phase 1 Treatment Plant and Collection System upgrades and repairs with
McMahon. General upgrades to Lift Station #1 and replacement of Lift Station #2.
Improvements to "preliminary treatment" including influent pump station, hauled-in
waste receiving, influent screening, and grit removal. Improvements to "secondary
treatment" including equipment and piping associated with the aeration basins,
clarifiers, and chemical storage and feed systems. Improvements to UV disinfection
and effluent pumping. Pump, piping and valve replacement to improve solids
handling. Electrical, controls, and SCADA system upgrades. General improvements
to existing treatment building and site.
$8,000,000 2026
2 Phase 2 Replacement of blowers, modifications to aeration piping, adding mixers to
basins, replace clarifier drive, chemical storage and feed system improvements, add
effluent orthophosphate analyzer, replace effluent pumps, improvements to UV
system, replacement of sludge transfer pumps and piping, improve sludge decant
pumps and piping, general improvements to treatment building and grounds.
$2,700,000 2027
5. Financial Management General Comments
The Village has decided to hold off on the phase approach for the improvements and revisit this in
a single phase. We are currently working on restructuring the REU assignments and will adjust the
rates accordingly.
Compliance Maintenance Annual Report
Ephraim Wastewater Treatment Facility Last Updated: Reporting For:
5/14/2026 2025
ENERGY EFFICIENCY AND USE
6. Collection System
6.1 Energy Usage
6.1.1 Enter the monthly energy usage from the different energy sources:
COLLECTION SYSTEM PUMPAGE: Total Power Consumed
Number of Municipally Owned Pump/Lift Stations: 4
Electricity Consumed
(kWh)
Natural Gas Consumed
(therms)
January 3,793
February 3,173
March 3,597
April 5,586
May 5,542
June 5,332
July 6,541
August 6,332
September 5,297
October 3,621
November 2,975
December 3,435
Total 55,224 0
Average 4,602 0
6.1.2 Comments:
Electrical usage lift 1 & 2
6.2 Energy Related Processes and Equipment
6.2.1 Indicate equipment and practices utilized at your pump/lift stations (Check all that apply):
Comminution or Screening
Extended Shaft Pumps
Flow Metering and Recording
Pneumatic Pumping
SCADA System
Self-Priming Pumps
Submersible Pumps
Variable Speed Drives
Other:
6.2.2 Comments:
6.3 Has an Energy Study been performed for your pump/lift stations?
No
Yes
Compliance Maintenance Annual Report
Ephraim Wastewater Treatment Facility Last Updated: Reporting For:
5/14/2026 2025
Year:
2018
By Whom:
McMahon / Focus on Energy
Describe and Comment:
An energy study was conducted on the efficient use of KWs used to operate lift stations.
6.4 Future Energy Related Equipment
6.4.1 What energy efficient equipment or practices do you have planned for the future for your
pump/lift stations?
When the Village moves forward with the upgrades safety and efficiency is at the top of the list.
7. Treatment Facility
7.1 Energy Usage
7.1.1 Enter the monthly energy usage from the different energy sources:
TREATMENT PLANT: Total Power Consumed/Month
Electricity
Consumed
(kWh)
Total Influent
Flow (MG)
Electricity
Consumed/
Flow
(kWh/MG)
Total Influent
BOD (1000 lbs)
Electricity
Consumed/
Total Influent
BOD
(kWh/1000lbs)
Natural Gas
Consumed
(therms)
January 25,227 0.98 25,742 0.81 31,144
February 25,990 0.76 34,197 0.64 40,609
March 26,678 2.55 10,462 1.09 24,475
April 22,640 3.38 6,698 2.13 10,629
May 20,293 3.33 6,094 3.97 5,112
June 25,497 4.21 6,056 7.53 3,386
July 34,432 5.36 6,424 9.64 3,572
August 35,666 4.02 8,872 6.85 5,207
September 36,611 2.51 14,586 4.38 8,359
October 33,428 2.24 14,923 5.89 5,675
November 30,474 1.11 27,454 1.65 18,469
December 29,542 1.08 27,354 1.30 22,725
Total 346,478 31.53 45.88 0
Average 28,873 2.63 15,739 3.82 14,947 0
7.1.2 Comments:
7.2 Energy Related Processes and Equipment
7.2.1 Indicate equipment and practices utilized at your treatment facility (Check all that apply):
Aerobic Digestion
Anaerobic Digestion
Biological Phosphorus Removal
Coarse Bubble Diffusers
Dissolved O2 Monitoring and Aeration Control
Effluent Pumping
Compliance Maintenance Annual Report
Ephraim Wastewater Treatment Facility Last Updated: Reporting For:
5/14/2026 2025
Fine Bubble Diffusers
Influent Pumping
Mechanical Sludge Processing
Nitrification
SCADA System
UV Disinfection
Variable Speed Drives
Other:
7.2.2 Comments:
7.3 Future Energy Related Equipment
7.3.1 What energy efficient equipment or practices do you have planned for the future for your
treatment facility?
When we do the upgrades to the facility electrical efficiency is a goal.
8. Biogas Generation
8.1 Do you generate/produce biogas at your facility?
No
Yes
If Yes, how is the biogas used (Check all that apply):
Flared Off
Building Heat
Process Heat
Generate Electricity
Other:
9. Energy Efficiency Study
9.1 Has an Energy Study been performed for your treatment facility?
No
Yes
Entire facility
Year:
2018
By Whom:
McMahon / Focus on Energy
Describe and Comment:
An energy study was conducted on the efficient use of KWs used to operate the plant.
Part of the facility
Year:
Compliance Maintenance Annual Report
Ephraim Wastewater Treatment Facility Last Updated: Reporting For:
5/14/2026 2025
By Whom:
Describe and Comment:
Total Points Generated 0
Score (100 - Total Points Generated) 100
Section Grade A
Compliance Maintenance Annual Report
Ephraim Wastewater Treatment Facility Last Updated: Reporting For:
5/14/2026 2025
Sanitary Sewer Collection Systems
1. Capacity, Management, Operation, and Maintenance (CMOM) Program
1.1 Do you have a CMOM program that is being implemented?
Yes
No
If No, explain:
1.2 Do you have a CMOM program that contains all the applicable components and items
according to Wisc. Adm Code NR 210.23 (4)?
Yes
No (30 points)
N/A
If No or N/A, explain:
1.3 Does your CMOM program contain the following components and items? (check the
components and items that apply)
Goals [NR 210.23 (4)(a)]
Describe the major goals you had for your collection system last year:
Collection system being properly operated, and maintained. Meet the general standards listed in
the WPDES permit.
Did you accomplish them?
Yes
No
If No, explain:
Organization [NR 210.23 (4) (b)]
Does this chapter of your CMOM include:
Organizational structure and positions (eg. organizational chart and position descriptions)
Internal and external lines of communication responsibilities
Person(s) responsible for reporting overflow events to the department and the public
Legal Authority [NR 210.23 (4) (c)]
What is the legally binding document that regulates the use of your sewer system?
Chap 13 NU Ordinance
If you have a Sewer Use Ordinance or other similar document, when was it last reviewed and
revised? (MM/DD/YYYY) 2025-06-10
Does your sewer use ordinance or other legally binding document address the following:
Private property inflow and infiltration
New sewer and building sewer design, construction, installation, testing and inspection
Rehabilitated sewer and lift station installation, testing and inspection
Sewage flows satellite system and large private users are monitored and controlled, as
necessary
Fat, oil and grease control
Enforcement procedures for sewer use non-compliance
Operation and Maintenance [NR 210.23 (4) (d)]
Does your operation and maintenance program and equipment include the following:
Equipment and replacement part inventories
Up-to-date sewer system map
Compliance Maintenance Annual Report
Ephraim Wastewater Treatment Facility Last Updated: Reporting For:
5/14/2026 2025
A management system (computer database and/or file system) for collection system
information for O&M activities, investigation and rehabilitation
A description of routine operation and maintenance activities (see question 2 below)
Capacity assessment program
Basement back assessment and correction
Regular O&M training
Design and Performance Provisions [NR 210.23 (4) (e)]
What standards and procedures are established for the design, construction, and inspection of
the sewer collection system, including building sewers and interceptor sewers on private
property?
State Plumbing Code, DNR NR 110 Standards and/or local Municipal Code Requirements
Construction, Inspection, and Testing
Others:
Overflow Emergency Response Plan [NR 210.23 (4) (f)]
Does your emergency response capability include:
Responsible personnel communication procedures
Response order, timing and clean-up
Public notification protocols
Training
Emergency operation protocols and implementation procedures
Annual Self-Auditing of your CMOM Program [NR 210.23 (5)]
Special Studies Last Year (check only those that apply):
Infiltration/Inflow (I/I) Analysis
Sewer System Evaluation Survey (SSES)
Sewer Evaluation and Capacity Managment Plan (SECAP)
Lift Station Evaluation Report
Others:
Needs assessment and facility plan amendment has been completed by McMahon Engineering.
0
2. Operation and Maintenance
2.1 Did your sanitary sewer collection system maintenance program include the following
maintenance activities? Complete all that apply and indicate the amount maintained.
Cleaning 100 % of system/year
Root removal 0 % of system/year
Flow monitoring 25 % of system/year
Smoke testing 0 % of system/year
Sewer line
televising 7 % of system/year
Manhole
inspections
50 % of system/year
Lift station O&M 156 # per L.S./year
Manhole
rehabilitation
5 % of manholes rehabbed
Mainline
rehabilitation
0 % of sewer lines rehabbed
Private sewer
inspections
0 % of system/year
Compliance Maintenance Annual Report
Ephraim Wastewater Treatment Facility Last Updated: Reporting For:
5/14/2026 2025
Private sewer I/I
removal 0 % of private services
River or water
crossings
0 % of pipe crossings evaluated or maintained
Please include additional comments about your sanitary sewer collection system below:
3. Performance Indicators
3.1 Provide the following collection system and flow information for the past year.
28.22 Total actual amount of precipitation last year in inches
30.83 Annual average precipitation (for your location)
11.2 Miles of sanitary sewer
4 Number of lift stations
0 Number of lift station failures
0 Number of sewer pipe failures
0 Number of basement backup occurrences
0 Number of complaints
0.0799 Average daily flow in MGD (if available)
0.2582 Peak monthly flow in MGD (if available)
Peak hourly flow in MGD (if available)
3.2 Performance ratios for the past year:
0.00 Lift station failures (failures/year)
0.00 Sewer pipe failures (pipe failures/sewer mile/yr)
0.00 Sanitary sewer overflows (number/sewer mile/yr)
0.00 Basement backups (number/sewer mile)
0.00 Complaints (number/sewer mile)
3.2 Peaking factor ratio (Peak Monthly:Annual Daily Avg)
0.0 Peaking factor ratio (Peak Hourly:Annual Daily Avg)
4. Overflows
LIST OF SANITARY SEWER (SSO) AND TREATMENT FACILITY (TFO) OVERFLOWS REPORTED **
Date Location Cause Estimated
Volume
None reported
** If there were any SSOs or TFOs that are not listed above, please contact the DNR and stop work
on this section until corrected.
5. Infiltration / Inflow (I/I)
5.1 Was infiltration/inflow (I/I) significant in your community last year?
Yes
No
If Yes, please describe:
5.2 Has infiltration/inflow and resultant high flows affected performance or created problems in
your collection system, lift stations, or treatment plant at any time in the past year?
Yes
Compliance Maintenance Annual Report
Ephraim Wastewater Treatment Facility Last Updated: Reporting For:
5/14/2026 2025
No
If Yes, please describe:
5.3 Explain any infiltration/inflow (I/I) changes this year from previous years:
We found a sump pump that was connected to the sanitary sewer mistakenly by the property
owner. It was addressed right away and reconnected to the storm sewer drain on the property.
5.4 What is being done to address infiltration/inflow in your collection system?
continued manhole inspections and line televising with repairs being made as they arise.
Total Points Generated 0
Score (100 - Total Points Generated) 100
Section Grade A
Compliance Maintenance Annual Report
Ephraim Wastewater Treatment Facility Last Updated: Reporting For:
5/14/2026 2025
Grading Summary
WPDES No: 0061271
SECTIONS LETTER GRADE GRADE POINTS WEIGHTING
FACTORS
SECTION
POINTS
Influent A 4 3 12
BOD/CBOD A 4 10 40
TSS A 4 5 20
Ammonia A 4 5 20
Phosphorus A 4 3 12
Biosolids A 4 5 20
Staffing/PM A 4 1 4
OpCert A 4 1 4
Financial A 4 1 4
Collection A 4 3 12
TOTALS 37 148
GRADE POINT AVERAGE (GPA) = 4.00
Notes:
A = Voluntary Range (Response Optional)
B = Voluntary Range (Response Optional)
C = Recommendation Range (Response Required)
D = Action Range (Response Required)
F = Action Range (Response Required)
Compliance Maintenance Annual Report
Ephraim Wastewater Treatment Facility Last Updated: Reporting For:
5/14/2026 2025
Resolution or Owner's Statement
Name of Governing
Body or Owner:
Village of Ephraim
Date of Resolution or
Action Taken:
2026-06-01
Resolution Number:
02-2026
Date of Submittal:
ACTIONS SET FORTH BY THE GOVERNING BODY OR OWNER RELATING TO SPECIFIC CMAR
SECTIONS (Optional for grade A or B. Required for grade C, D, or F):
Influent Flow and Loadings: Grade = A
Effluent Quality: BOD: Grade = A
Effluent Quality: TSS: Grade = A
Effluent Quality: Ammonia: Grade = A
Effluent Quality: Phosphorus: Grade = A
Biosolids Quality and Management: Grade = A
Staffing: Grade = A
Operator Certification: Grade = A
Financial Management: Grade = A
Collection Systems: Grade = A
(Regardless of grade, response required for Collection Systems if SSOs were reported)
ACTIONS SET FORTH BY THE GOVERNING BODY OR OWNER RELATING TO THE OVERALL
GRADE POINT AVERAGE AND ANY GENERAL COMMENTS
(Optional for G.P.A. greater than or equal to 3.00, required for G.P.A. less than 3.00)
G.P.A. = 4.00
VILLAGE OF EPHRAIM
RESOLUTION 02-2026
WISCONSIN DEPARTMENT OF NATURAL RESOURCES
WHEREAS, it is a requirement under a Wisconsin Pollutant Discharge Elimination System (WPDES)
permit issued by the Wisconsin Department of Natural Resources to file a Compliance Maintenance
Annual Report (CMAR) for its (Wastewater Treatment/Wastewater Collection System) under the
Wisconsin Administrative Code NR 208; WHEREAS, it is necessary to acknowledge that the governing
body has reviewed the Compliance Maintenance Annual Report (CMAR);
WHEREAS, it is necessary to provide recommendations or an action response plan for all individual
CMAR section grades (of “C” or less) and/or an overall grade point average (< 3.00);
BE IT THEREFORE RESOLVED by the Wastewater Committee of the Village of Ephraim that the
following recommendations or actions will be taken to address or correct problems/ deficiencies of the
wastewater treatment or collection system as identified in the Compliance Maintenance Annual Report
(CMAR). The Wastewater Treatment/Wastewater Collection System received a 4.0 overall grade point
average (Grade A) with no corrections or deficiencies at the time of the regular meeting of the
Wastewater Committee.
Adopted by the Wastewater Committee at its regular meeting on the 1st
day of June 2026
VILLAGE OF EPHRAIM
COUNTY OF DOOR, WISCONSIN
By:
Karen McMurtry, Village of Ephraim
Wastewater Committee Chair
Attest:
Brent Bristol, Village of Ephraim Administrator