Wastewater Committee Minutes
Monday, June 1, 2026, 9:00 AM
Present: Karen McMurtry- Chair, Rick Hoyerman, Bruce Nelson, Jim Peterman
Online: Dennis Jewell
Staff: Brad Rasmusson – Wastewater Manager/Operator in Charge, Brent Bristol –
Administrator, Andrea Collak – Clerk/Treasurer
Online: Daniel Oakley – Wastewater Operator
1. Call to order: The meeting was called to order by Chair - McMurtry and a quorum was present
for this meeting.
2. Changes in Agenda: None
3. Previous minutes – Minutes from May 11, 2026
Peterman moved, McMurtry seconded to approve May 11, 2026, meeting minutes as
presented, all ayes, and the motion carried.
4. Visitors’ comments: None
5. Ephraim Plant Manager Report:
EFF samples sent to Northern Lake Services for ammonia testing:
Ph testing: Five times per week as required.
TSS, BOD, Po4, labs with lab cleanup: Twice per week as required.
Eff E-coli test, this must be done May-October once per week while running disinfection.
• Sent out, completed, and submitted 2026 sludge characteristics test to DNR, and the Village is
awaiting a response.
• Great Lakes TV & Seal cleaned the lift stations. Dewatering bag was used to dump
the waste into then hauled and dumped at GFL. During a dewatering bag operation, a zip tie
securing the bag failed, causing an estimated 300–400 gallons of material to discharge back
onto the asphalt surface. A spill response plan was activated: sandbags were deployed, a
vacuum truck was used to recover material from the ground, and the entire area was sanitized
and rinsed. The OIC subsequently consulted with the DNR, who determined that the incident
did not meet the threshold for a formal spill report. Corrective procedures will be implemented
for future dewatering operations.
• Sent out more effluent samples for permit renewal testing.
• Shortly after annual meter calibration, it was discovered that the composite sampler was not
collecting samples when flow rates exceeded 150 gallons per minute due to a faulty 4-20
milliamp voltage amplifier. The component was identified and replaced for approximately $35
via an online supplier, and normal sampling function was restored. Rasmusson noted that flows
above 150 gallons per minute are precisely when higher solids concentrations occur, making
accurate sampling most important.
• Interviews for a summer position were conducted. Nathan Merkle was hired for the summer
season.
• Gathered and entered data for ECMAR.
• Wet wells, deep wells, and lift stations were inspected and found to be in good condition.
Seasonal equipment along North Shore Road was transitioned from winter to summer
configurations.
VILLAGE OF EPHRAIM
FOUNDED 1853
Wastewater Committee Minutes
June 1, 2026
Page 2 of 3
• Assisted the maintenance department with assembling and installing flags for streetlights.
Upcoming Paving: Paving work is anticipated near the facility toward the end of the month.
The crew will coordinate truck access and service logistics with neighboring stations during the
anticipated one-to-one-and-a-half-week period when heavy vehicle access will be restricted.
Phase 1 / Solar Project Update: Rasmusson reported that an option to incorporate solar into
the Phase 1 project submission was explored but would require an additional $5,000–$10,000 in
engineering costs. The current plan remains to resubmit Phase 1 as originally designed by the
September deadline. The potential for principal forgiveness of approximately $2,100,000
through the state funding program is expected to be clarified in the December–January
timeframe. Rasmusson acknowledged the Village may rank high enough to qualify but may be
too low on the priority list to receive the forgiveness and noted that solar and other project
phasing decisions will be better informed once those answers are received.
Ephraim Well Water Testing: Year to Date
Number of Water Tests: 172 476
In-House Bacteria: 159 421
Clean Water Testing: 13 55
Ephraim Septage Service: Year to Date
Holding Tank Pump Outs: 7 16
Septic Pump Outs/Inspections:
Emergency Call Ins:
6. Discussion and consideration of the 2025 WI DNR eCMAR report
Compliance Maintenance Annual Report (CMAR) is a self-evaluation tool that promotes the
owner’s awareness and responsibility for wastewater collection and treatment needs, measures
the performance of wastewater treatment works during a calendar year, and assesses its level of
compliance with permit requirements. The governing body of a publicly owned treatment works
shall pass a resolution that verifies its review of the CMAR, summarizes recommended or
corrective actions if necessary, and authorizes the submittal of the eCMAR form.
The Village received an overall score a 4.0 overall Grade Point Average (GPA) Grade A with
no corrections or deficiencies at the time of the regular meeting of the Wastewater Committee.
Rasmusson noted this score reflects strong performance across all reporting categories such as
Influent Flow and Loading, Effluent Quality and Plant Performance (BOD/CBOD, Total
Suspended Solids, Ammonia – NH3, Phosphorus), Biosolids Quality and Management,
Staffing and Preventive Maintenance, Operator Certification and Education, Financial
Management, and Sanitary Sewer Collection Systems.
It was noted that the village's replacement fund balance well exceeds the DNR's minimum
required threshold of $265,500. The OIC highlighted that all zero-violation fields in the report
reflect clean discharge results throughout the year.
Hoyerman asked about the scoring scale and was informed that a score below 3 would be cause
for concern and could affect the environmental discharge fee assessed against the Village.
Hoyerman also inquired whether deteriorating capital infrastructure related to the upcoming
treatment plant project could negatively affect the score; Rasmusson indicated that equipment
Wastewater Committee Minutes
June 1, 2026
Page 3 of 3
failures alone would not do so, as redundant equipment is in place, and only events such as a
reportable spill or injury would likely impact the rating.
Discussion also touched on the sewer collection system camera inspection requirement. The
DNR requests that 20% of the collection system be inspected annually, but recent years have
seen only approximately 5% completed due to budget constraints. Rasmusson suggested that the
committee consider establishing a dedicated budget line for camera work rather than relying on
remaining funds in the general collection system maintenance budget. For reference, the Village
has approximately 1.2 miles of sewer pipe within its 3-mile footprint.
McMurtry noted that the Village has consistently received a score of 4 throughout recent
committee history, with the only exceptions occurring during a period of sanitary sewer
overflow events on North Shore Road.
The committee recognized Rasmusson and his team for their continued excellent performance.
7. Discussion and consideration of resolution 02-2026 – Wisconsin Department of Natural
Resources, Wisc. Admin. Code NR 208 – Compliance Maintenance Resolution
Rasmusson explained that this resolution is a companion item to the eCMAR report and is
required to appear as a separate agenda item. The resolution was presented and approved as part
of the same motion approving the eCMAR report. Rasmusson will submit the 2025 WI DNR
eCMAR this week.
McMurtry moved, Nelson seconded to approve 2025 eCMAR resolution 02-2026 -
Wisconsin Department of Natural Resources, WISC, Admin Code NR 208 – Compliance
Maintenance Resolution, all ayes, and the motion carried.
8. Visitors’ comments: None
9. New business for the next meeting:
Nelson made a point for the record regarding the solar component of the wastewater treatment
upgrade project. he emphasized that solar represents the only portion of the anticipated project
that carries a guaranteed principal forgiveness benefit—approximately 30% of the solar project
cost funded through external sources—and is also the only component projected to generate
long-term savings on electricity costs over the next 30 or more years. Nelson further noted that
solar would provide a hedge against inevitable future increases in electric rates. He urged the
committee to give serious consideration to solar, whether included within the broader project
phases or pursued as a standalone project, characterizing it as a fiscally prudent obligation to
village residents and businesses who will otherwise face rate increases as a result of the facility
expansion.
The next meeting was set for July 6, 2026.
9. Adjournment
McMurtry moved, Hoyerman seconded to adjourn the meeting, all ayes, and the motion
carried.
Recorded by Andrea Collak - Clerk/Treasurer