Please note that, upon reasonable notice at least 24 hours in advance, efforts will be made to accommodate the needs of disabled
individuals through appropriate aids and services or provide a video link for meetings. For additional information, or to request this
service, please contact the City Clerk's Office at 715-479-8682 ext. 224,525 E. Maple Street, P.O. Box 1269, Eagle River WI 54521.
Date of posting 9/4/2026 bjb
AGENDA NOTICE
THE COMMON COUNCIL OF THE CITY OF EAGLE RIVER WILL HOLD A MEETING ON
TUESDAY, SEPTEMBER 8, 2026, 6:00 PM AT CITY HALL, 525 E. MAPLE STREET IN EAGLE RIVER.
The meeting will be available via Zoom at the following link:
https://us06web.zoom.us/j/81145375663?pwd=bQHqovHJVhgsraba1g3yEoGUXFGtmf.1
Meeting ID: 811 4537 5663
Passcode: 064873
1. Call to Order
2. Pledge of Allegiance
3. Roll Call
4. Approve the agenda in any order
5. Approve Minutes of Previous Meetings
6. Discussion and Possible Action on the Following Agenda Items:
A. Appointment of Becky Boxrucker as Alderperson to District 4 – Ward 5, term ending 4/2027
B. Listing of Public Records Requests to the City of Eagle River
C. MSA Monthly Updates
i. Silver Lake Road project, Change Order #2, total change to project -$48,206.15
ii. Silver Lake Road project, Pay Application #2 for final payment to Pitlik & Wick,
+$19,002.89
iii. 2026 Street Project, Change Order #1, street patching, total change to project
+$8,900.00
D. Eagle River Light & Water
i. Approval of 5 -year contract, 8/18/ 2026 through 12/31/2030, to spread sludge on
Richardson property described as the E ½ of the NE ¼ of the NW ¼ of Section 10,
Township 40, Range 10 East in the Town of Washington, Vilas County, Wisconsin.
ii. Compliance Maintenance Annual Report (CMAR) Report Card
E. Golf Course
i. Greens Update
ii. Golf Pro Update
F. Eagle River Fire Department – Fire Chief monthly update
G. Eagle River Police Department
H. Administrator’s monthly update on activities of all departments
i. Delay of McKinley resurfacing project to 2028 to allow for funding applications for
water and sanitary sewer work in conjunction with the project
ii. Delay of 2026 Chipsealing work to 2027
Please note that, upon reasonable notice at least 24 hours in advance, efforts will be made to accommodate the needs of disabled
individuals through appropriate aids and services or provide a video link for meetings. For additional information, or to request this
service, please contact the City Clerk's Office at 715-479-8682 ext. 224,525 E. Maple Street, P.O. Box 1269, Eagle River WI 54521.
Date of posting 9/4/2026 bjb
I. Planning Commission:
i. Ordinance 607: Failed Motion – Recommendation to Zoning Code Amendment:
Recommendation to the City Council to approve only the first proposed amendment
to Section 106 -473 of the City of Eagle River Zoning Ordinance, removing “Storage
buildings not used for habitation – human or animals” from the uses permitted by
conditional grant in the Highway Commercial zoning district. Following discussion, the
question was called. The motion failed for lack of a majority vote. The full proposed
ordinance is included in the packet.
ii. Recreational Easement Request : Recommendation to approve r equest by River Trail
Commission/Great Headwaters Trail Foundation for a Perpetual Recreational
Easement, Tax Parcel 221 -187. F ull property description in the easement
documentation.
iii. SnoEagles Building Request: Recommendation to approve SnoEagles request to pursue
building a new groomer shed on DPW Shop property at 1020 Bluebird to accommodate
their groomers and provide better facilities for their volunteers and club members.
J. Resolution 1081 - Honoring Denny Geiseman Upon His Induction Into The Heroes Hall Of Fame
K. Discussion of potential dog park locations and development plan
i. Update from Veterans Resource Center on land purchase and proposed partnership
with the City.
ii. Alternate Dog Park locations
L. Operator’s Licenses:
i. REGULAR: Anthony Bigonia, Anthony Gaetano, Kaemyn Heritage, Alicia Jellen, Conner
Killion, Sherre Maxon, Sherrill Mayoh
M. Direct Sellers Permits:
i. Asking for consideration to allow a s elf-service/unattended baked goods stand in
private business parking lot, Christy Myers
ii. Dublin Sports Bar and Grill LLC, DBA Dublin’s Paddy Wagon, Food Truck, one month
term, October 2026, Locations to be determined, Jon Racine
iii. Dan Moncher, DBA Taco Dan Food Truck, Food Truck, one month term, October 2026,
Locations to be determined, Dan Moncher
N. Committee and Commission Assignments
i. Appointment of Jon Touchette to fill vacancy on BID Board through November 2026.
ii. Amending Dan Grosskopf Appointment Classification to City Council Representative to
ER Light and Water Commission
iii. Appointment of Dan Grosskopf a s City Council Representative to Joint Ambulance
Commission
iv. Appointment of Dan Grosskopf as City Council Representative to Joint Review Board
v. Appointment of Dan Grosskopf as City Council Representative to Eagle River
Revitalization Program Board of Directors
Please note that, upon reasonable notice at least 24 hours in advance, efforts will be made to accommodate the needs of disabled
individuals through appropriate aids and services or provide a video link for meetings. For additional information, or to request this
service, please contact the City Clerk's Office at 715-479-8682 ext. 224,525 E. Maple Street, P.O. Box 1269, Eagle River WI 54521.
Date of posting 9/4/2026 bjb
vi. Appointment of Dan Grosskopf City Council Representative to Unified Lower Eagle
River Chain of Lakes Commission
vii. Appointment of Dan Grosskopf and Kim Schaffer as City Council Representatives to the
Committee on Public Works
viii. Appointment of Dan Grosskopf as City Council Representative to the Committee on
Public Welfare
ix. Appointment of Phoebe Spier as the City Representative to the Walter E Olson Library
Board
O. Approve payment of the bills for the City and the Golf Course
7. Adjourn to Closed Session according to Wisconsin State Statute: 19.85(1)(c) Considering
employment, promotion, compensation or performance evaluation data of any public
employee over which the governmental body has jurisdiction or exercises responsibility.
a. 2027 Golf Pro Contract Negotiation & Succession Plan
8. Reconvene in Open Session according to Wisconsin State Statute 19.85(2) with possible
action on closed session agenda items.
9. Adjourn.
August 18, 2026
A meeting of the Common Council of the City of Eagle River was called to order at 6:00PM by Mayor Deb
Brown.
The Pledge of Allegiance was led by Dan Grosskopf and was recited by all present.
Roll Call: Dan Dumas, Kim Schaffer, Vic Washelesky and Dan Grosskopf. Also in attendance: Robin Ginner,
Becky Bolte, Tony Sable, Kyle Anderson and Mike Sanborn. Brad Adamovich present via Zoom.
Motion by Washelesky, 2nd by Schaffer to approve the agenda in any order. Carried, all.
Motion by Dumas, 2nd by Washelesky to approve the minutes of 7-14-2026 Common Council and 7-29-26
Special Council meetings. Carried, all.
a) A listing of public record requests to the City of Eagle River for July 2026 was provided.
b) MSA Monthly Updates: John Promer presented a written update including the 2026 Street Projects update
and reports the Silver Lake Road Project is substantially complete.
c) Eagle River Light & Water:
Sanborn presented Resolution #1079 to approve Amendment No 3 to Long Term Power Supply Contract with
WPPI for participating members. Motion by Schaffer, 2nd by Grosskopf to approve Resolution 1079 to approve
amendment No 3 to long term power supply contract with WPPI. Carried on a roll call vote, all.
Motion by Washelesky, 2nd by Dumas to approve of the disposal of old safe by any means as determined by
Sanborn. Carried, all.
Sanborn presented the sludge update stating they have approval from the DNR to spread 210,000 gallons of
sludge on 17.5 acres of private landowners’ acreage off 17 North. Landowner has proposed a 5 year term at a
rate of $.07 per gallon spread Sanborn presenting the 210,000 gallons capacity for spreading would result in
$14,700 per year. Attorney Garbowicz to draw up contract. Sanborn is working with DNR for approval of
additional acreage in the same area.
Sanborn gave an update on the Electric Rate Increase anticipated to go into effect after January 1, 2027,
stating the PSC is driving the increase. The overall electric rate increase is 1.75% with the average homeowner
using 503 kilowatt hours will see a $.93 a month increase. The average commercial customer using 1370
kilowatt hours will see a $2.47 a month increase. The PSC will review and public hearing will be done before
implementation.
d) Golf Course
Greens Update: Superintendent Kyle Anderson provided a verbal report stating the 7-27-26 storm damage
cleanup is done and that the storm damage caused a two day closure of the course. Backwoods Tree Service
was contracted with to do some clearing to open up the right side of hole 8 and tee box on hole 8.
An update to the Employee Golfing Privileges Benefit Policy was presented by Ginner. Discussion. No change
to policy, leaving policy alone to allow Golf Pro to have sole discretion on allowing unpaid use by employees.
Golf Pro Update: Tony Sable provided a written report. Sable reported total revenue is down from July 2025
to July 2026 and things are going smoothly. Sable asked that the parking lot at the clubhouse be addressed
for repair. Ginner stated DPW can stripe new lines in the parking lot, and she will get options and estimated
cost to chipseal or resurface. Sable also requested the south side of the cart barn be repaired with some kind
of wood siding as tarps are beginning to look terrible. Greens Department will take care of this year.
e) Eagle River Fire Department: Fire Chief Jim Randall provided a written update. Report states call volume
continues to remain high. Report states 205 calls through the end of July 2026 compared to 113 calls through
the end of July 2025.
f) Eagle River Police Department: Salvinski provided a written report of PD activity for July.
Ginner presented quotes from IT Strategies for PD technology upgrade for transferring from Vilas County IT to
IT Strategies. Of the $33,090 requested, $16,000 was budgeted for in 2026 with the remainder being funded
by making a budget amendment from the 2026 PD payroll budget line item. Vilas County is discontinuing IT
support to the Eagle River PD. Motion by Schaffer, 2
nd by Washelesky to approve Migration Hardware quote of
$8,300.13, Migration Costs quote of $18,513.00, Software Licensing quote of $1,287.45, and Wiring Upgrades
quote of $4,990.00 for technology upgrade to transfer service from Vilas County IT to IT Strategies. Carried on
a roll call vote, all.
g) City Administrator’s monthly update on activities of all departments: Ginner presented a written report.
h) Planning Commission:
i) Ordinance 606 – Amending the Future Land Use Map of the City of Eagle River Comprehensive Plan and
Rezone of Buskager Property: Parcel #221-1058-6011, 1025 Elm Drive, SE-SE,Sect. 33, T40N,R10E, LOT 2
22CS212 CSM 5874 FKA PRT SE SE EXC 540834, from Parks/Recreation to Office/Residential. Schaffer stated
the Planning Commission recommends approval of the change. Motion by Schaffer, 2nd by Dumas to accept
the Planning Commission recommendation and adopt Ordinance 606, rezoning 1025 Elm Drive, Tax Parcel
#221-1058-6011, from Parks/Recreation to Office/Residential and amending the Future Land Use Map of the
City of Eagle River Comprehensive Plan to reflect the change. Carried on a roll call vote, all.
i) Discussion of potential dog park locations and development plan: Ginner presented six additional location
options for a dog park along with the option behind City Hall as proposed by Washelesky. Brad Adamovich,
DPW Foreman, provided a report of anticipated financial and service impacts on DPW regarding snow
removal due to the proposed reduction of land use behind city hall. Adamovich also provided a report of
implications and considerations for placing dog park behind City Hall. Washelesky visited all locations and
supplied Council with a site comparison spreadsheet, rating each of the options.
Option 1: City owned parcel, 1.7 acres at the end of Railroad on Fern St.
Option 2: Push the location behind City Hall to the Northeast corner, 1.08 acres
Option 3: Miller Park on Minnesota Street, re-design of playground equipment location, .75 acres
Option 4: Trackside trade on West Fern, trading the section of highway frontage in front of their business that
they currently pay rent to use for 1.14 acres and naming rights of dog park.
Option 5: Indiana St, .84 acres, Aspirus deed restriction would need to be removed.
Option 6: Portion of Riverside Park to be used as a joint effort between Vilas County and Eagle River.
Option 7: Jessica Bortolloti and Denny Geiseman provided a written presentation for 2.75 acres to be used as
a combination and Veterans Memorial/dog park on the property owned by Aspirus between Railroad and
Bluebird Rd.
Discussion on all options with pros and cons of each location discussed, with agenda item being postponed
until September City Council meeting.
j) Street Closing/display of goods/event food trucks/temporary sign/amplification permits:
Motion by Dumas, 2nd by Schaffer to approve Tracy Van Houten of Totally Pawsome event application to offer
a Free Rabies Clinic on Saturday, October 10, 2026, 10AM – 1PM with access to the vestibule at the Eagle
River Light and Water end of City Hall, allowing parking in area around City Hall, having a licensed veterinarian
from NW Animal Hospital administer vaccine. Event sponsored by Incredible Bank and held in conjunction with
the Eagle River Police Department. Carried, all.
Motion by Schaffer, 2nd by Grosskopf to approve the following permit amendments to the Eagle River Area
Chamber of Commerce as presented:
1) AMENDED permit to add food trucks and road closure: Cranberry Fest Arts & Crafts, Farmer’s Market,
Antique/Vintage Show, October 3, 2026, 6am – 6pm, addition of: Closed - First St from Wall St north to alley
for food trucks.
2) AMENDED permit to add food trucks: Labor Day Arts and Crafts Show and Sidewalk Sale, September 6, 202,
6am - 6pm, addition of food trucks on First St.
Carried, all.
k) Motion by Washelesky, 2
nd by Dumas to approve Liquor license Successor Agent Update to The Craftsman
American Tavern, 118 S Main, Appointment of Successor Agent – Susan Justice for term ending 6/30/27.
Carried, all.
l) Motion by Schaffer, 2
nd by Washelesky to approve Operator’s Licenses as listed: REGULAR: Christine Aldridge,
Mary Bruskiewicz, Ashley Henke, Anelise Hubbard, Sarah Luchsinger, Guy Mickelson, Nathan Miller, Melissa
Oettinger, Robyn Perlewitz, Isaiah Samuelson, Michael Schmidt, Chelsea Sims, Samuel Tucker. Carried, all.
m) Motion by Dumas, 2nd by Grosskopf to approve a Taxi Drivers License to Elizabeth McCarty, VIP Group DBA
Eagle River Taxi, Term ending 4/30/27. Carried, all.
n) Motion by Washelesky, 2nd by Schaffer to accept the resignation of Kathy Patten as city representative for
the Walter E Olson Memorial Library Board, with gratitude for her years of service. Carried, all.
o) Motion by Schaffer, 2nd by Grosskopf to adopt Resolution 1077 – Resolution of Appreciation for Jerry
Burkett. Carried, all.
p) Motion by Schaffer, 2nd by Washelesky to amend the appointment of Jerry Burkett to the Eagle River Union
Airport Commission from City Council representative to City appointed member. Carried, all
q) Motion by Washelesky, 2nd by Dumas to deny the presented proposed Charter Ordinance adding Sec 2-105
Term Limits- Establishing Term Limits for the offices of Mayor and Alderperson relating to received Petition for
Direct Legislation imposing term limits allowing the electors to vote on the proposed charter ordinance with a
referendum question on the November 3, 2026, ballot. Carried on a roll call vote, all.
r) Motion by Schaffer, 2nd by Grosskopf to approve payment of the bills for the city and the golf course as
recommended by the Finance Committee. Carried on a roll call vote, all.
Motion by Schaffer, 2nd by Dumas to adjourn at 7:15PM. Carried, all.
Aug
ust 19, 2026
A Special Session of the Common Council of the City of Eagle River was called to order at 5:03PM by Mayor
Deb Brown.
Roll Call: Kim Schaffer, Dan Grosskopf and Vic Washelesky. Also in attendance: Becky Bolte. was Absent: Dan
Dumas
a) E
agle River Fire Department Resolution to Exceed Levy Limit Referendum for Fire Protection and Emergency
Services – Administrative Constraints and Financial Implications. Discussion. No Action.
b) Motion by Schaffer, 2nd by Grosskopf to accept the resignation of Dan Dumas as Alderperson from District 4
– Ward 5 effective August 22, 2026. Carried, all.
c) Motion by Washelesky, 2nd by Schaffer to approve Riverview Park bathroom repair estimate from Sydlee
Builders, $17,210.00. Carried on a roll call vote, all.
Motion by Schaffer, 2nd by Grosskopf to adjourn at 5:40PM. Carried, all.
Be
cky J Bolte - Clerk
Open Records Requests
Clerk - August 2026
1
2
3
4
5
6
7
8
9
10
11
A B C D
REQUESTER DATE TOPIC Hours
Owen Wang - The Sconi 8/10/2026 Business Licenses 5 minutes
LWM 8/11/2026 Update to roster including salaries 30 minutes
Kathryn Craffey 8/14/2026 Airport Joint Commission Structure and
appointments
15 minutes - City
part of Airport
request
Kathryn Craffey 8/17/2026 Liability Insurance - E&O and Bonds 2 minutes
Chelsea Sims 8/19/2026 8-18-26 and 8-19-26 City Council Mtg Video 15 minutes
Michelle Drew 8/20/2026 ERFD Proposed Referendum Doc 5 minutes
Kathryn Craffey 8/20/2026 Temp/Permanent Sign Permits 30 minutes
Kathryn Craffey 8/21/2026 8-18-26 and 8-19-26 City Council Mtg Video
and voter roll (Badgervoters) 15 minutes
Claire Resch - Howard
Disposal 8/20/2026 Garbage Service Invoices - COER and GC 15 minutes
Cole Kreger 8/28/2026 Pickleball Court Reservation Agreement 15 minutes
City of Eagle River
UPDATE
Page 1 of 2
G:\00\00088\! City of Eagle River\2026 Update\9 8 26 Update.docx
UPDATE A Review of MSA ’s Commitment to Your Community
CLIENT LIAISON:
John Promer P.E.
Phone: 715-304-0415
Cell: 715-605-2331
jpromer@msa-ps.com
DATE:
September 8, 2026
2026 STREETS PROJECT (R00088144)
A preconstruction meeting was held August 27, 2026 with the City and the contractor. Contractor
began work week of 8-31-26 on the two easternmost alley’s and plans to work on the remaining two
alley’s end of September with paving planned for early October.
NON TID SERVICES 2026 (R00088145)
The Non TID services contract allows MSA to respond quickly to small engineering service requests
as they come up.
SILVER LAKE ROAD (R00088117)
The City of Eagle River was awarded a $320,971.32 MSID grant from WISDOT for the reconstruction
of Silver Lake Road from the intersection of Sheridan Street and Silver Lake Road to the City limits
(near the swimming beach). The project is now complete, and retainage is being released. Including
both change orders the planned project came in approximately 0.75% higher than the original contract
amount.
GIS UPDATE (R00088098)
The City upgraded their GIS apps in 2025 to the latest version of ESRI software called ArcGIS
Experience Builder. 2025 and 2026 sewer TV data has been processed and is available on the GIS
website. The city continues to use their GIS web applications as an asset manager to track, inspect
and maintain their online street and utility systems.
USER AGREEMENT WITH LANDFILL UPDATE (R00088141)
MSA will continue to facilitate User Agreement talks between the City of Eagle River and Highway G
Landfill. The discussions relating to updating the agreement have paused as the City is no longer
accepting the landfill’s leachate. Additional conversations are anticipated in the coming months. MSA
has also periodically shared information with the landfill and their engineer regarding leachate
pretreatment.
PROJECT UPDATE
Page 2 of 2
G:\00\00088\! City of Eagle River\2026 Update\9 8 26 Update.docx
PROJECT UPDATE City of Eagle River
September 8, 2026
GENERAL WASTEWATER ASSISTANCE UPDATE (R00088143)
MSA has provided various technical assistance to the City of Eagle River in recent months.
• MSA recommended the City undertake influent sampling in efforts to gain a better understanding
of potential PFAS sources.
o Wastewater influent and effluent samples in May and July 2026 show considerable
variability.
o Additional sampling, as required by DNR, may shed light on whether any trends are
present and potential conclusions can be drawn. The next round of sampling is scheduled
for September or October.
• The current state of the industry is that PFAS compounds should be eliminated/treated at the
source(s) and not install treatment at municipal WWTFs.
• Long-term planning for solids handling and processing is recommended.
WDNR INTENT TO APPLY – CLEAN WATER FUND AND SAFE DRINKING WATER LOAN
PROGRAMS
A utility and street reconstruction project along McKinley Road from Railroad Street to the end of the
golf course property includes sanitary forcemain, sanitary sewer, watermain and street reconstruction.
MSA can submit a n ITA for the McKinley Project on behalf of the City. N ew guidelines for the DNR
Program require that plans and specifications are submitted with the ITA. The project cost for the
construction including construction contingency and engineering is estimated to be $2,969,743.
The following is a possible schedule for the grant application submittal and McKinley project
completion:
ACTION ITEM DATE
City Approves MSA Contract for Survey, Design, and
Specifications October 2026
MSA completes Topographic Survey and Project Design Fall/Winter of 2026/2027
Intent to Apply (ITA) due to WDNR May 1, 2027
WDNR CWF / SDWF Applications Due to WDNR August 1, 2027
Bid project to Contractor January 2028
Begin Construction Spring 2028
Complete Construction Fall 2028
• Dates listed above are tentative and may be subject to change.
It is important to think about what possible projects could come up in the next year to apply for. This
should be looked at like a wish list. Funding changes will happen over the next year, and this is the
required first step in using DNR loan and grant programs.
00088117
4 From 10/30/25 to 08/18/26 08/18/26
A C D E F G H I J K L
Item Quantity Units
Unit Price
($)
Value of Bid Item
(C X E)
($)
Estimated
Quantity
Incorporated in
the Work
Value of Work
Completed to Date
(E X G)
($)
1 1 L.S. 28,000.00 28,000.00 1.00 28,000.00 28,000.00 100% -
2 1 L.S. 4,500.00 4,500.00 1.00 4,500.00 4,500.00 100% -
3 1 L.S. 21,500.00 21,500.00 1.00 21,500.00 21,500.00 100% -
4 1 L.S. 18,750.00 18,750.00 1.00 18,750.00 18,750.00 100% -
5 20 C.Y. 0.01 0.20 - - - 0% 0.20
6 30 C.Y. 15.00 450.00 - - - 0% 450.00
7 1,380 L.F. 2.00 2,760.00 1,500.00 3,000.00 3,000.00 109% (240.00)
8 300 S.Y. 2.00 600.00 186.00 372.00 372.00 62% 228.00
9 1 EA. 100.00 100.00 - - - 0% 100.00
10 2 EA. 100.00 200.00 2.00 200.00 200.00 100% -
11 288 S.F. 4.00 1,152.00 288.00 1,152.00 1,152.00 100% -
12 5 EA. 2,100.00 10,500.00 5.00 10,500.00 10,500.00 100% -
13 24 L.F. 275.00 6,600.00 - - - 0% 6,600.00
14 4 EA. 205.00 820.00 - - - 0% 820.00
15 2 EA. 1,400.00 2,800.00 - - - 0% 2,800.00
16 1 EA. 4,600.00 4,600.00 1.00 4,600.00 4,600.00 100% -
17 24 L.F. 265.00 6,360.00 35.00 9,275.00 9,275.00 146% (2,915.00)
18 4 EA. 295.00 1,180.00 4.00 1,180.00 1,180.00 100% -
19 2 EA. 1,500.00 3,000.00 2.00 3,000.00 3,000.00 100% -
20 1 EA. 4,600.00 4,600.00 1.00 4,600.00 4,600.00 100% -
21 14 V.F. 725.00 10,150.00 14.00 10,150.00 10,150.00 100% -
22 2 EA. 3,300.00 6,600.00 2.00 6,600.00 6,600.00 100% -
23 1 EA. 3,000.00 3,000.00 1.00 3,000.00 3,000.00 100% -
24 50 L.F. 100.00 5,000.00 54.00 5,400.00 5,400.00 108% (400.00)
25 58 L.F. 110.00 6,380.00 63.00 6,930.00 6,930.00 109% (550.00)
26 1 EA. 1,250.00 1,250.00 1.00 1,250.00 1,250.00 100% -
27 2 EA. 1,350.00 2,700.00 2.00 2,700.00 2,700.00 100% -
28 15 C.Y. 100.00 1,500.00 10.50 1,050.00 1,050.00 70% 450.00
29 25 S.Y. 20.00 500.00 22.00 440.00 440.00 88% 60.00
30 2 EA. 9,500.00 19,000.00 - - - 0% 19,000.00
31 55 L.F. 75.00 4,125.00 60.00 4,500.00 4,500.00 109% (375.00)
32 1 L.S. 86,465.00 86,465.00 1.00 86,465.00 86,465.00 100% -
33 300 C.Y. 15.00 4,500.00 88.52 1,327.80 1,327.80 30% 3,172.20
34 300 C.Y. 15.00 4,500.00 88.52 1,327.80 1,327.80 30% 3,172.20
35 5,800 S.Y. 17.25 100,050.00 5,511.00 95,064.75 95,064.75 95% 4,985.25
36 1,020 S.Y. 21.25 21,675.00 1,004.00 21,335.00 21,335.00 98% 340.00
37 375 S.Y. 15.00 5,625.00 375.00 5,625.00 5,625.00 100% -
38 5,800 S.Y. 5.50 31,900.00 5,511.00 30,310.50 30,310.50 95% 1,589.50
39 300 S.Y. 2.50 750.00 - - - 0% 750.00
40 75 C.Y. 35.00 2,625.00 - - - 0% 2,625.00
41 1,290 L.F. 15.70 20,253.00 1,281.00 20,111.70 20,111.70 99% 141.30
42 200 L.F. 32.90 6,580.00 194.00 6,382.60 6,382.60 97% 197.40
43 7,600 S.F. 5.05 38,380.00 7,428.00 37,511.40 37,511.40 98% 868.60
Application Date:Application Period:Application No.:
Traffic Control
Furnish & Install 4" Thick Aggregate Gravel Shoulder, 3/4-inch
Furnish & Install Temporary Gravel
Furnish & Install 24" Concrete Curb & Gutter, Type D
Furnish & Instll 15" Dia RCP Apron End Wall
Furnish & Install 18" Dia. RCP Apron End Wall
Furnish & Install Medium Rip Rap
Furnish & Install Geotextile Fabric, Type HR
Furnish & Install 12" Thick Aggregate Base Course, 1 1/4-inch
Furnish & Install Storm Manhole, Type 1
Furnish & Install Storm Manhole, Type 1, Base and Casting
Furnish & Install 30" Dia. Catch Basin, Complete w/ Base & Casting
Furnish & Install 15" Dia. RCP Class 3 Storm Sewer
Furnish & Install 18" Dia. RCP Class 3 Storm Sewer
Furnish & Install Storm Manhole Baffle 48" x 36"
Remove Existing Storm Sewer Pipe Outside of Common Trench
Unclassified Excavation ( Includes Removals)
Excavation Below Subgrade
Furnish & Install Granular Borrow
Contractor's Application for PaymentProgress Estimate - Unit Price Work
Owner's Project No.:
Engineer's Project No.:
Contractor's Project No.:
City of Eagle River
MSA Professional Services
Pitlik & Wick, INC.
Silver Lake Road ReconStruction
Silver Lake Road ReconStruction Project
Owner:
Engineer:
Contractor:
Project:
Contract:
Connect to Existing Watermain
Watermain Exploratory Excavation
Furnish & Install Inlet Protection, Type D
Furnish & Install 2" Thick Polystyrene Insulation
B
Rock Excavation
Original Contract
% of
Value of
Item
(J / F)
(%)
Balance to Finish (F -
J)
($)
Mobilization, Bonds, & Insurance
Erosion and Sedimentation Control
Turf Restoration
Description
Work Completed
Materials Currently
Stored (not in G)
($)
Work Completed
and Materials
Stored to Date
(H + I)
($)
Contract Information
Bid Item
No.
Trucked Backfill
Furnish & Install Silt Fence
Furnish & Install Erosion Mat, Class 1, Type B Urban
Furnish & Install Inlet Protection, Type A
Furnish & Install Casting & Adjustment Rings on Sanitary Manhole
Furnish & Install 4" D.I. Class 52 Forcemain
Furnish & Install 4" Bend
Connect to Existing Forcemain
Sanitary Forcemain Exploratory Excavation
Furnish & Install 6" Dia. C.I. Class 52 Watermain
Funish & Install 6" Bend
Furnish & Install Woven PolyPropylene Geotextile Fabric, TYPE SAS
Furnish & Install Pedestrian Curb
Furnish & Install 4" Thick Concrete Sidewalk
Furnish & Install 6" Thick Aggregate Base Course, 3/4-Inch
Furnish & Install Geo-Grid TX5
Unit Price
EJCDC C-620 Contractor's Application for Payment
(c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved. 1 of 3
00088117
4 From 10/30/25 to 08/18/26 08/18/26
A C D E F G H I J K L
Item Quantity Units
Unit Price
($)
Value of Bid Item
(C X E)
($)
Estimated
Quantity
Incorporated in
the Work
Value of Work
Completed to Date
(E X G)
($)
Application Date:Application Period:Application No.:
Contractor's Application for PaymentProgress Estimate - Unit Price Work
Owner's Project No.:
Engineer's Project No.:
Contractor's Project No.:
City of Eagle River
MSA Professional Services
Pitlik & Wick, INC.
Silver Lake Road ReconStruction
Silver Lake Road ReconStruction Project
Owner:
Engineer:
Contractor:
Project:
Contract:
B
% of
Value of
Item
(J / F)
(%)
Balance to Finish (F -
J)
($)Description
Work Completed
Materials Currently
Stored (not in G)
($)
Work Completed
and Materials
Stored to Date
(H + I)
($)
Contract Information
Bid Item
No.
44 80 S.F. 9.00 720.00 228.00 2,052.00 2,052.00 285% (1,332.00)
45 200 S.Y. 30.00 6,000.00 154.00 4,620.00 4,620.00 77% 1,380.00
46 4,850 S.Y. 20.75 100,637.50 4,850.00 100,637.50 100,637.50 100% -
47 150 L.F. 15.00 2,250.00 150.00 2,250.00 2,250.00 100% -
48 3,000 L.F. 1.75 5,250.00 3,000.00 5,250.00 5,250.00 100% -
49 500 L.F. 3.00 1,500.00 123.50 370.50 370.50 25% 1,129.50
50 30 L.F. 4.00 120.00 8.50 34.00 34.00 28% 86.00
51 40 S.F. 53.00 2,120.00 40.00 2,120.00 2,120.00 100% -
52 400 L.F. 20.00 8,000.00 390.00 7,800.00 7,800.00 98% 200.00
53 5,800 S.Y. 0.01 58.00 - - - 0% 58.00
628,635.70$ 583,244.55$ -$ 583,244.55$ 93% 45,391.15$
Dust Control Surface Treatment-Calcium Chloride
Sawcut Asphalt Pavement
Sawcut Concrete
Furnish & Install Curb Ramp Retectable Warning Fields
Furnish & Install Cedar Split Rail Fence
Original Contract Totals
Furnish & Install 6" Thick Concrete Driveway Pavement
Furnish & Install 2.5" Thick Asphaltic Driveway Pavement
Furnish & Install 4" Thick Asphaltic Pavement
Furnish & Install Pavement Marking, Epoxy, 6" (White)
Furnish & Install Pavement Marking, Epoxy, 4" (Yellow)
Unit Price
EJCDC C-620 Contractor's Application for Payment
(c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved. 2 of 3
00088117
4 From 10/30/25 to 08/18/26 08/18/26
A C D E F G H I J K L
Item Quantity Units
Unit Price
($)
Value of Bid Item
(C X E)
($)
Estimated
Quantity
Incorporated in
the Work
Value of Work
Completed to Date
(E X G)
($)
Application Date:Application Period:Application No.:
Contractor's Application for PaymentProgress Estimate - Unit Price Work
Owner's Project No.:
Engineer's Project No.:
Contractor's Project No.:
City of Eagle River
MSA Professional Services
Pitlik & Wick, INC.
Silver Lake Road ReconStruction
Silver Lake Road ReconStruction Project
Owner:
Engineer:
Contractor:
Project:
Contract:
B
% of
Value of
Item
(J / F)
(%)
Balance to Finish (F -
J)
($)Description
Work Completed
Materials Currently
Stored (not in G)
($)
Work Completed
and Materials
Stored to Date
(H + I)
($)
Contract Information
Bid Item
No.
CO #1 - - - -
1 LS 2,000.00 2,000.00 1.00 2,000.00 2,000.00 100% -
1 LS 500.00 500.00 1.00 500.00 500.00 100% -
1 LS 4,500.00 4,500.00 1.00 4,500.00 4,500.00 100% -
100 S.Y. 3.00 300.00 125.00 375.00 375.00 125% (75.00)
2 EA. 100.00 200.00 2.00 200.00 200.00 100% -
2 EA. 2,500.00 5,000.00 2.00 5,000.00 5,000.00 100% -
98 L.F. 95.00 9,310.00 98.00 9,310.00 9,310.00 100% -
1 EA. 500.00 500.00 1.00 500.00 500.00 100% -
64 S.F. 4.00 256.00 64.00 256.00 256.00 100% -
1 LS 4,000.00 4,000.00 1.00 4,000.00 4,000.00 100% -
160 S.Y. 19.00 3,040.00 160.00 3,040.00 3,040.00 100% -
60 S.Y. 15.00 900.00 60.00 900.00 900.00 100% -
160 S.Y. 5.50 880.00 160.00 880.00 880.00 100% -
160 S.Y. 2.50 400.00 160.00 400.00 400.00 100% -
160 S.Y. 32.00 5,120.00 160.00 5,120.00 5,120.00 100% -
30 L.F. 3.00 90.00 30.00 90.00 90.00 100% -
- - - -
CO#1 - - - -
1 LS 3,500.00 3,500.00 1.00 3,500.00 3,500.00 100% -
1 LS 3,500.00 3,500.00 1.00 3,500.00 3,500.00 100% -
1 LS 5,500.00 5,500.00 - - 0% 5,500.00
- - - -
CO#1 - - - -
122 C.Y. 20.00 2,440.00 90.00 1,800.00 1,800.00 74% 640.00
- - - -
CO#1 - - - -
1 LS 1,000.00 1,000.00 1.00 1,000.00 1,000.00 100% -
- - - -
CO#2 1.00 LS 3,250.00 3,250.00 1.00 3,250.00 3,250.00 100% -
- - - -
CO#2 1.00 LS (51,456.15) (51,456.15) - - 0% (51,456.15)
- - - -
- - - -
4,729.85$ 50,121.00$ -$ 50,121.00$ 1060% (45,391.15)$
633,365.55$ 633,365.55$ -$ 633,365.55$ 100% -$
BOOKKEEPING ITEM
Add Joint Ties to Storm Sewer
Drill out holes and Add joint ties
BREAKER RUN SHOULDER
Hirzel Street
Illinois Street
Millings on Alley B/W Hirzel & N Dyer
Haul, Place, and Compact Millings from Silver Lake Road, approx 12ft wide 3
2. Erosion and Sedimentation Control
15. Furnish & Install 3" Thick Asphaltic Pavement
3. Turf Restoration
Mc Faul Lane
1. Mobilization
14. Furnish & Instal Woven Polypropylene Geotextile Fabric, Type SAS
16. Sawcut Asphalt Pavement
HMA Patches
Rasberry Lane
Project Totals
Change Order Totals
Original Contract and Change Orders
9. 2" Thick Polystyrene Insulation
10. Unclassified Excavation ( Includes Removals)
11. Furnish & Install 10" Thick Aggregate Base Course, 1 1/4-inch
12. Furnish & Install 3" Thick Gravel Shoulder, 3/4-inch
13. Furnish & Install Geo-Grid TX5
4. Furnish & Install Erosion Mat, Class 1, Type B Urban
5. Furnish & Install Inlet Protection, Type D
6. Furnish & Install 30" Dia. Catch Basin, Complete w/ Base & Casting
7. Furnish & Install 12" Dia. RCP Storm Sewer
8. Make Connection to Existing Storm Sewer Inlet
Change Orders
Unit Price
EJCDC C-620 Contractor's Application for Payment
(c) 2018 National Society of Professional Engineers for EJCDC. All rights reserved. 3 of 3
1
9-4-2026
City of Eagle River
2026 Streets Project
Proposed Contract Change Order #1 –Reasons
1. Asphalt Patches
The City has patches that are desired to be addressed on Willow Road, Adams Road,
West Division Street Patch by Children’s Museum, and Third Street by New Park
Bathrooms. The cost per patch area includes saw cutting, final grading of gravel, and
asphalt paving.
COST = $8,900.00
CHANGE ORDER #1 TOTAL = $8,900.00
CHANGE ORDER #1
2026 Streets Project
City Of Eagle River
Summary of Changes
Item
Description Total Cost
#1
Asphalt Patches on Willow Road,
Adams Road, West Division
Street Patch by Children’s
Museum, and Third Street by
New Park Bathrooms
$8,900.00
Sub-Total Items #1-#1 $8,900.00
Total Change Order #1
$8,900.00
Page 1 of 1
09/03/26
2026 Eagle River Streets Project
CO#1- Patches
John,
Please see the below proposed change orders. This will all be done with the same mix type 4LT 58-28 paved in
two layers, 3 inches total thickness.
o 12' X 43' — Willow Road - road by Kwik Trip.: $4,250.00
o 4’ X 4’ — Adams Road my manhole repair.: $1,000.00
o 6’ X 6’ — patch in road by manhole repair near children’s museum.: $1,000.00
o 18’ X 10’ — Third Street by new park bathrooms.: $2,650.00
Thank You,
Jakob Klessig
Pitlik & Wick, Inc.
715-891-5462
8075 Highway D
Eagle River, WI 54521
Telephone (715) 479-7488
FAX (715) 479-7438
www.pitlikandwick.com
CLARENCE PITLIK
1919 - 2000
EDWARD C. WICK
1928 – 1997
KENT PITLIK
Chairman of the Board
BRIAN PITLIK
President
BRADLEY PITLIK
Vice-President
CAROLYN LURVEY
Secretary
SCOTT WICK
Treasurer
Page 1 of 6
Environmental Loans Program Process
Improvements Proposal
Background
The Wisconsin Departments of Natural Resources (DNR) and Administration (DOA) recognize the
current funding process of the Clean Water Fund Program (CWFP) and the Safe Drinking Water Loan
Program (SDWLP) can be lengthy and cumbersome for both the state administrators and the
program applicants. The DNR and the DOA have identified opportunities to improve the funding
process. Under the current process, the period between the start of the funding cycle to the latest
possible loan closing date can extend to approximately 28 months (over two years), or even longer if
the project is not competing for principal forgiveness.
Goals
• Reduce the overall timeframe between project identification and loan closing.
• Increase the value of notice of intent to apply (ITA) submissions by requiring projects to be
further through the planning and design process before entering the funding process.
• Improve the ratio of ITAs that advance to complete loan applications, resulting in more
accurate and meaningful project priority lists.
• Reduce administrative workload for DNR staff, municipalities, and consulting engineers by
eliminating repetitive annual submissions by allowing the ITA to remain valid over multiple
years.
• Publish the funding lists early enough so that projects can be bid at the time of year with the
best pricing.
• Distribute loan closings more evenly across the funding cycle to reduce the concentrated surge
of closings typically seen at the end of the funding cycle.
Key Differences from Current Funding Process
The proposal requires projects to be further through the planning and design process before entering
the funding process but aims to make funding available more quickly once that point is reached. The
funding timeline and process described below are intended to create a consistent timeline between
the CWFP and SDWLP. This proposal decreases the timeline from ITA to latest possible loan closing
from 28 months, or 34 months for non-principal forgiveness CWFP projects, to approximately 23
months for all projects.
Intent to Apply Submission
• The due date has changed.
• Plans and specifications are now required with the ITA.
• Annual ITA resubmittal is not required, as long as the original ITA remains active.
• The ITA will remain active for as long as the plans and specifications approval is valid.
• The ITA system remains open year-round.
Page 2 of 6
The ITA deadline will now be May 1. Approvable plans and specifications will now be required to be
submitted with the ITA and submitted to the applicable DNR program (wastewater, public water
system, or storm water) through the plan review process by the ITA deadline. For projects applying
through the CWFP, an approved facility plan must also be obtained before submitting the ITA.
The CWFP facility plan deadline will be dependent on project type. If the project is for the wastewater
treatment plant, the facility plan submittal deadline will be Nov. 1. If the project is for the collection
system, or is a storm water project, the facility plan submittal deadline will be Feb. 1.
Additionally, applicants will no longer be required to submit the ITA annually. Instead, an eligible ITA
will remain active for as long as the associated plan and specification approval is valid as specified in
the approval letter. A new ITA is required only if the approval expires or if a new plan and
specification approval is required.
The May 1 deadline will provide sufficient time for the DNR to complete eligibility determinations
before the subsequent application deadline, allowing eligible projects to be ranked in priority score
order via the self-score. However, the online ITA system will remain open throughout the year, and
ITAs, along with plans and specifications, may be submitted at any time.
Applicants who miss the May 1 ITA deadline are not precluded from applying later. Applicants may
still apply after the Aug. 1 application deadline (supplemental applications), provided all applicable
eligibility requirements are met. This rolling submission approach allows applicants to enter the
funding process year-round while ensuring projects submitted by May 1 remain eligible for initial
ranking and consideration for yearly principal forgiveness and loan funding. (Refer to “Supplemental
Applications” below.)
The new online ITA system is anticipated to open early February 2027. (Refer to “One Online
System” below.)
Project Priority List
• The project priority list (PPL) will be updated more frequently rather than being published
annually.
• The PPL will reflect self-scores and project eligibility.
The PPL will be maintained as a living document and updated on a quarterly basis. Quarterly updates
will include the addition of projects for which plans and specifications have been submitted, and the
removal of projects whose plans and specifications approval have expired or if the project has been
awarded CWFP or SDWLP funding. As long as the plans and specifications approval remains valid,
the project will continue to appear on the PPL. Projects will not be removed from the PPL solely
because a new state fiscal year has begun.
The PPL will reflect the priority ranking and evaluation formula (PERF) self-score.
To ensure the DNR has enough time for project eligibility determinations and PPL preparation, new
ITAs must be submitted by May 1 each year to be eligible to compete for principal forgiveness (PF)
and loan funding with the Aug. 1 application deadline. ITAs submitted after May 1 will get placed on
subsequent PPLs and can either submit an application after the Aug. 1 deadline as a supplemental
application or wait for the next funding cycle to apply as a competitive application.
Page 3 of 6
Application
• The due date has changed.
• The CWFP and SDWLP application deadlines are now aligned.
The CWFP and SDWLP application deadline will now be Aug. 1. A consistent timeline between the
two programs will help projects that are receiving funding from both programs (especially for
combined watermain and sanitary sewer projects).
The loan application will be available for all projects with a valid ITA on the PPL, meaning the DNR
has received approvable plans and specifications for an eligible project.
Supplemental applications will still be allowed at any time during the year for projects not competing
for principal forgiveness; however, applicants will continue to be encouraged to follow the application
deadline to compete for funding in case of loan capacity limitations.
Supplemental Applications
A supplemental application is any CWFP or SDWLP application submitted after the program’s
competitive application deadline (Aug. 1) for the current funding cycle. These applications can be
accepted if there is funding available but will not be eligible for principal forgiveness. Supplemental
applications are not ranked and will be accepted on a first-come, first-served basis. A complete
supplemental application must be submitted by the end of the state fiscal year—June 30, 2028, for
the state fiscal year (SFY) 2028 funding cycle.
Funding Lists
• The draft funding list will be published in November and final funding list in December.
• PERF scores will be reviewed for all projects submitting a loan application.
The DNR plans to publish the funding lists in a timely manner to better align with bidding schedules,
with a draft funding list published in November and a final funding list in December. PERF scores will
be reviewed by the DNR after the application deadline.
Applicants will have 15 days from the published draft funding list date to submit a priority score
reevaluation request.
Loan Closing
• The deadline has changed.
• Loan closing is based on the effective date of the construction contract.
The loan closing deadline will now be based on the effective date of the construction contract. Loan
closing will be required within nine months of the construction contract’s effective date, or if the
effective date is prior to the publishing of the draft funding list, then loan closing will be required nine
months after the date the draft funding list is published. Failure to meet this deadline will result in the
forfeiture of any allocated funding. The applicant may reapply for funding in the following year.
Page 4 of 6
For example, if the draft funding list is published on Nov. 1, 2027:
• For construction contracts with an effective date prior to Nov. 1, 2027, the loan would need
to close no later than Aug. 1, 2028.
• For construction contracts with an effective date after Nov. 1, 2027, the loan would need to
close within 9 months of the effective date. (Note the readiness-to-proceed deadline
below.)
The readiness-to-proceed deadline for all projects, including supplemental applications, will be July 1,
meaning bidding must have been completed and construction contracts executed by that date.
Planning and Design Loans
• Create a planning and design loan program.
• Subsidized loan.
• Loan term: five years.
The DNR is considering developing an optional planning and design loan program to assist applicants
with getting projects started. Funding would be offered through a subsidized loan for a maximum loan
term of five years. The application would be available year-round; therefore, no application deadline
would be established. The DNR plans follow-up with another effort to gauge interest and solicit
feedback.
One Online System
• Applicants will have project access in one online system.
The ITA/PERF system will be merged with the application and loan document upload system. The
updated online system is anticipated to open in February 2027.
Page 5 of 6
Table 1. SFY 2028 loan funding cycle deadlines.
Nov. 1, 2026 Deadline for submitting wastewater treatment plant facility plans to the DNR Water Quality Bureau for review for state fiscal year 2028
(SFY 28) projects. (CWFP Only)
Feb. 1, 2027 Deadline for submitting collection system facility plans to the DNR Water Quality Bureau and storm water facility plans to the DNR
Storm Water Program for review for SFY 28 projects. (CWFP Only)
May 1, 2027
SFY 28 notice of intent to apply (ITA) deadline.
• Approvable plans and specifications must be uploaded to the online system and submitted to the relevant DNR plan review program
by the ITA deadline:
o DNR Bureau of Water Quality through the wastewater plan review process.
o DNR Bureau of Drinking Water and Groundwater through the public water system plan review process.
o DNR Storm Water Program by email to the DNR regional storm water engineer or to the DNR central office storm water
engineer.
• A facility plan approval letter must be uploaded to the online system for all CWFP projects.
Online system anticipated to open February 2027.
July 1, 2027
Project priority list (PPL) published (shows eligible projects in priority score order based on self-scores).
• The PPL will be updated quarterly; however, the July PPL establishes the eligible projects that may submit an application for
funding and compete for principal forgiveness and loan funding on the SFY 28 funding list.
Aug. 1, 2027 SFY 28 application deadline if competing for principal forgiveness (PF) and loan funding.
Nov. 1, 2027
SFY 28 draft funding list published (shows each eligible project’s allocation of funds and the DNR project priority score).
• Submit a priority score reevaluation request within 15 days of published draft funding list.
Dec. 15, 2027 SFY 28 final funding list published (shows each eligible project’s allocation of funds).
July 1, 2028
SFY 28 readiness-to-proceed deadline for all projects. ALL required bid documentation, including executed construction contracts, are due.
Failure to meet this deadline will result in the forfeiture of any allocated funding. The applicant may reapply for funding in the following year.
*Loan closing is required within 9 months of the effective date of the construction contract, or if the effective date is prior to the publishing of
the draft funding list, then loan closing will be required 9 months after the date the draft funding list is published..
Page 6 of 6
Public Participation Process
This proposal is being posted for public comments beginning on Monday, Aug. 31, 2026. The draft
proposal is available on the DNR’s Environmental Loans webpage at dnr.wi.gov/aid/EIF.html. Written
comments on the proposal will be taken through Wednesday, Oct. 7. Send comments via email to
Matt Marcum, DNR Environmental Loans Section manager, at MatthewR.Marcum@wisconsin.gov.
The final version of this policy, including any revision made as a result of feedback received, will be
posted on the Environmental Loans webpage and included in any future intended use plans.
The DNR is hosting an informational webinar on Thursday, Sept. 17 at 2:30 p.m., to discuss these
changes. Further information about the webinar is available on the Environmental Loans webpage.
Due Dates
11/1/2026 WWTF Facility Plans
2/1/2027 Collection System and Storm Water Facility Plans
5/1/2027 ITA
Plans and Specs
Facility Plan Approval
8/1/2027 CWF & SDW Applications
11/15/2027 Submit PERF Re-Evaluations
7/1/2027 Publish SDW/CWF Project Priority List (PPL) updated quarterly
Project on PPL until project closed on loan OR P&S approval expires
11/1/2027 Draft Funding List Published
12/15/2027 Final Funding List Published
NOT part of Comment period, but info to share
SDW cap is $500,000 (was $1,600,000)
CWF cap is $1,000,000 (was $2,100,000)
PF Scoring is back to what it was prior to BIL
DNR Program Dates for FY2028
2027 Applications
PF Information for FY2028 (2027 Applications)
What's due
Loan Closing depends on:
If bid after 11/1/2027: all docs due 5 months after effective date on Agreement
If bid before 11/1/2027: all docs due 5 months after Draft Funding list
ALL docs due for loan closing by 7/1/2028 no matter when it bids
Loan closing required 9 months after effective date on Agreement
DNR Dates
Compliance Maintenance Annual Report
Eagle River City Of Last Updated: Reporting For:
6/22/2026 2025
DNR Response to Resolution or Owner's Statement
Name of Governing
Body or Owner:
City of Eagle River
Date of Resolution or
Action Taken:
2026-06-17
Resolution Number:
1076
Date of Submittal: 6/22/2026
ACTIONS SET FORTH BY THE GOVERNING BODY OR OWNER RELATING TO SPECIFIC CMAR
SECTIONS (Optional for grade A or B. Required for grade C, D, or F):
Influent Flow and Loadings: Grade = A
Permittee Response:
DNR Response:
Influent flow and loadings below design.
Effluent Quality: BOD: Grade = A
Permittee Response:
DNR Response:
Excellent EFF BOD quality.
Effluent Quality: TSS: Grade = A
Permittee Response:
DNR Response:
Excellent EFF BOD quality.
Effluent Quality: Phosphorus: Grade = A
Permittee Response:
DNR Response:
Excellent EFF Phosphorus quality.
Biosolids Quality and Management: Grade = A
Permittee Response:
DNR Response:
Land spreading records and reporting is all acceptable and meeting NR 204 requirements.
Staffing: Grade = A
Permittee Response:
DNR Response:
Staff prioritize maintenance and take great pride in their work. Please continue the excellent
performance.
Operator Certification: Grade = C
Compliance Maintenance Annual Report
Eagle River City Of Last Updated: Reporting For:
6/22/2026 2025
Permittee Response:
Apparently our WWTP changed from Basic to Advanced for some reason. We thought it was going
to stay at Basic. We will work with the DNR to resolve this problem as the Operator in Charge
only has a Basic liscence.
DNR Response:
At some point, the facility was classified as advanced due to utilizing biological phosphorus
removal (BNR). Following the November 2025 compliance inspection, it was determined that the
selector tanks do not consistently, effectively perform BNR. If future upgrades or process changes
allow the selector tanks to successfully perform biological nutrient removal (BNR) and consistently
achieve nutrient removal without chemical assistance, the department shall be notified. Upon
verification, the department will upgrade the facility classification from Basic to Advanced and
adjust operator certification requirements accordingly. Therefore, the OIC is certified at the proper
level and holds the necessary subclasses. Disregard the points.
Financial Management: Grade = A
Permittee Response:
DNR Response:
Sound financial situation.
Collection Systems: Grade = A
(Regardless of grade, response required for Collection Systems if SSOs were reported)
Permittee Response:
Regular cleaning of lines and make sure back up parts are in stock or shipped quickly.
DNR Response:
Thank you for performing the repairs as quickly as possible to correct the issue that caused the
digestor to foam over. Having spare parts on hand will enable you to address repairs more
quickly.
ACTIONS SET FORTH BY THE GOVERNING BODY OR OWNER RELATING TO THE OVERALL
GRADE POINT AVERAGE AND ANY GENERAL COMMENTS
(Optional for G.P.A. greater than or equal to 3.00, required for G.P.A. less than 3.00)
G.P.A. = 3.94
Permittee Response:
DNR G.P.A. Response:
The department does not require any further action in response to the 2025 CMAR.
DNR CMAR Overall Response:
Thank you for completing and submitting your 2025 CMAR. The CMAR is an annual self-evaluation
of your wastewater treatment plant, collection system, and associated wastewater management
activities. Everything looks to be in order, and your facility is operating very well. There are no
other requirements at this time. Nice job and thank you again. Brooke Klingbeil
DNR Reviewer: Klingbeil, Brooke Phone: (715) 495-1336
Address: Date: 8/29/2026225051 Rib Mountain Dr, Wausau, WI 54401
Report to the Eagle River City Council – End of August 2026
Submitted by Anthony Sable, PGA
Dear Council Members,
We had pretty good weather in August with a few days lost to rain. Thanks to Matt from maintenance for
getting the cart barn siding up. It looks so much better. The course is in great shape right now as we move into the fall. If
September is anything like last year, we should hit our 1-million-dollar gross revenue target again this year!
REVENUE FIGURES
GREEN FEES
August 2025 – 4,394 rounds - $138,103 - Green Fees – August 2026 – 4,789 rounds - $147,159
YTD 2025 – 16,213 rounds - $480,500 - YTD 2026 – 16,052 rounds - $483,480
CARTS
August 2025 - $51,056 - August 2026 - $54,678
YTD 2025 - $180,567 - YTD 2026 - $184,980
RANGE
August 2025 - $10,484 - August 2026 - $9,400
YTD 2025 - $42,291 - YTD 2026 - $35,075
MERCHANDISE
August 2025 - $16,476 - August 2026 - $17,745
YTD 2025 - $69,198 - YTD 2026 - $72,491
TOTAL REVENUE
August 2025 - $216,760 - August 2026 - $230,244
YTD 2025 - $907,559 - YTD 2026 - $910,143
- Anthony Sable, PGA Golf Professional/General Manager
Eagle River Golf Course
Eagle River Golf Course Marketing Report & Proposed Facebook Posts
August 18, 2026
Kim Swisher Communications, LLC. (715) 437-0090 Page 1 of 12
Facebook Page:
As of today, the page has 2,973 followers.
On July 16th, the page had 2,951 followers.
Facebook Insights:
Eagle River Golf Course Marketing Report & Proposed Facebook Posts
August 18, 2026
Kim Swisher Communications, LLC. (715) 437-0090 Page 2 of 12
Facebook Insights (continued):
Eagle River Golf Course Marketing Report & Proposed Facebook Posts
August 18, 2026
Kim Swisher Communications, LLC. (715) 437-0090 Page 3 of 12
Facebook Audience Demographics:
Facebook Reels:
Reels Link - https://www.facebook.com/EagleRiverGolfCourse/reels/
Eagle River Golf Course Marketing Report & Proposed Facebook Posts
August 18, 2026
Kim Swisher Communications, LLC. (715) 437-0090 Page 4 of 12
Facebook Ads:
Instagram Page:
Eagle River Golf Course Marketing Report & Proposed Facebook Posts
August 18, 2026
Kim Swisher Communications, LLC. (715) 437-0090 Page 5 of 12
Google Analytics:
July 16th through August 18th
June 16th through July 16th
Visitor Demographics:
The primary age of website visitors in this period was 25-34. Males comprised 71% of page visitors.
Eagle River Golf Course Marketing Report & Proposed Facebook Posts
August 18, 2026
Kim Swisher Communications, LLC. (715) 437-0090 Page 6 of 12
Website Pages Visitors are Viewing:
Location of Website Visitors:
State City
Eagle River Golf Course Marketing Report & Proposed Facebook Posts
August 18, 2026
Kim Swisher Communications, LLC. (715) 437-0090 Page 7 of 12
Google Ads:
Proposed Facebook and Instagram Posts:
9/1 – September mornings were made for golf. Grab your clubs, enjoy the fresh air and start your day on the
fairway. https://eaglerivergolfcourse.com/teetimes/
9/4 – We all have our favorites. Which hole on our course is your favorite to play? Tell us in the comments—
we’d love to hear your pick!
Eagle River Golf Course Marketing Report & Proposed Facebook Posts
August 18, 2026
Kim Swisher Communications, LLC. (715) 437-0090 Page 8 of 12
9/7 - May the only work done today be on the green.
9/9 - Some days call for checking off the to-do list. Others call for checking in at the first tee. We know which
one we’d choose. https://eaglerivergolfcourse.com/teetimes/
9/12 - Our course has the best golfing and the best good boy in the area.
Eagle River Golf Course Marketing Report & Proposed Facebook Posts
August 18, 2026
Kim Swisher Communications, LLC. (715) 437-0090 Page 9 of 12
9/15 - Golf, fresh air and Northwoods views.
9/18 - Every great golf day starts and ends at the clubhouse, come to @Sandbaggers Clubhouse at The Eagle River
Golf Course and make yourself at home.
9/21 - It’s International Week of Happiness at Work! If you can’t feel the positive vibes in the office, try coming to
the green! https://eaglerivergolfcourse.com/teetimes/
Eagle River Golf Course Marketing Report & Proposed Facebook Posts
August 18, 2026
Kim Swisher Communications, LLC. (715) 437-0090 Page 10 of 12
9/23 – There’s still time to enjoy a round of golf! Reserve your tee time today: https://eaglerivergolfcourse.com/
9/26 – Happy Love Note Day! 💌🏌️
9/29 – We’ve got the golf covered and @Sandbaggers Clubhouse at the Eagle River Golf Course will take care of the
refreshments. See you soon! ⛳🍔
Eagle River Golf Course Marketing Report & Proposed Facebook Posts
August 18, 2026
Kim Swisher Communications, LLC. (715) 437-0090 Page 11 of 12
10/1 – 🍂 Don’t put your clubs away just yet! Fall is one of the best times to enjoy a round in the Northwoods. ⛳
Click to view reel
10/4 – Happy National Golf Lovers Day! Can’t wait to celebrate with you. 🏌️⛳❤️
https://eaglerivergolfcourse.com/teetimes/
10/7 – Since 1923, we’ve been welcoming golfers to our fairways. Nearly a century later, we’re proud to continue
sharing one of Wisconsin’s hidden gems with golfers from near and far.
⛳ https://eaglerivergolfcourse.com/about-us/
Eagle River Golf Course Marketing Report & Proposed Facebook Posts
August 18, 2026
Kim Swisher Communications, LLC. (715) 437-0090 Page 12 of 12
10/10 – Our golfers? 10/10. ⛳ Our course? 10/10. 🍂 A beautiful Fall day to play? Also 10/10.
https://eaglerivergolfcourse.com/teetimes/
10/13 – Fall golf tip: Switch to a brightly colored golf ball this time of year. It can make finding your ball among
the leaves a whole lot easier, leaving more time to enjoy your round.
We welcome your comments or questions and will schedule these posts upon your approval.
Respectfully submitted,
Team Swisher
Kassie Bellin, Dina Casso, Karly Kolehouse and Kim Swisher
Office: 715-437-0090
Email: kassie@kimswisher.com
Email: dina@kimswisher.com
Email: karly@kimswisher.com
Email: kim@kimswisher.com
Eagle River Fire Department
820 East Pine Street
Eagle River, WI 54521
(715) 479-8835
Fire Chief: Jim Randall
jimrandall041@gmail.com | Monthly Operations Report | Page 1
August 2026 Call Summary
Incident activity by type and municipality
Prepared 1 September 2026
36 241 19
AUGUST CALLS YEAR-TO-DATE MEDICAL ASSISTS
Calls by Incident Type
Medical assists accounted for more than half of all responses this month.
Incident type Count % of total
Medical assist 19 52.8%
Motor vehicle accident (MVA) 5 13.9%
Alarms 7 19.4%
Structure / other fire 1 2.8%
Grass fire 1 2.8%
Lines down 1 2.8%
Drone 1 2.8%
Gas spill 1 2.8%
Total 36 100.0%
Calls by Municipality
Town of Washington generated the largest share of activity. Phelps is a single mutual-aid / out-of-area response.
Municipality Count % of total
City of Eagle River 8 22.2%
Town of Washington 15 41.7%
Town of Lincoln 6 16.7%
Town of Cloverland 6 16.7%
Town of Phelps 1 2.8%
Total 36 100.0%
Notes
Year-to-date through 31 August 2026 is 241 calls. August was 14.9% of the year-to-date total. Counts are
incident-based (one incident = one call), not apparatus or personnel hours.
Low-frequency events this month: one fire, one grass fire, one lines-down, one drone assignment, and one gas
spill.
1 | Page
City Administrator’s Report
September 2, 2026
Submitted by Robin Ginner
Admin/General
Riverside Park Rezoning Update – The following is a timeline of actions and requests related
to the rezoning of Riverside Park.
City attorney, Steve Garbowicz, has recommended that the City not entertain any further
rezoning requests on Riverside Park until the County Board has approved a motion determining
the future use of that property.
• December 4, 2025 – An application to rezone the property was submitted by Phil
Kreisel of MSA on behalf of the Vilas County Board.
• January 8, 2026 – The City Planning Commission held a public hearing regarding the
proposed rezoning of the property to Single - and Two-Family Residential zoning.
Following the public hearing, the Planning Commission recommended that the City
Council approve the proposed zoning change, and the recommendation was
forwarded to the City Council for consideration.
• January 13, 2026 – Motion by Schaffer, 2nd by Dumas to approve Resolution 1072,
a Resolution approving a preliminary plat for 10 lots at Riverside Park with 2 out lots
as presented. Carried on a roll call vote. Ayes: Schaffer, Dumas; Nays: Washelesky;
Burkett abstained.
• June 19, 2026 (approx.) – Chad Keranen, a representative of the Vilas County Forest
and Recreation Department and Committee submitted a request to rezone the
property back to Park/Recreation. Following a discussion with the City Attorney
and the County Board Chair, because the request was submitted by a committee
that did not have authorization from the County Board, the request was returned
to the County.
• As of September 2, 2026 – No additional rezoning request has been submitted to
the City by the Vilas County Board.
Depot Brick Repairs – The brick work at the Depot is complete. All loose brick was torn off and
re-laid, and a significant portion of the building was tuckpointed.
July 27th Storm Damage – The roof on the bathroom at Riverview Park has been replaced, and
the damaged fencing has also been repaired. A representative from the Pickleball Club
indicated that she does not believe the court surface requires repair, as the discoloration
appears to b e primarily from sap left behind by the spruce tree that came down during the
storm.
The sign company the City typically uses will be in town the week of September 7 to assess
the industrial park sign that was damaged during the storm at the corner of Railroad and Jack
Frost Streets. The sign itself sustained little damage; however, the po sts broke off at ground
level, and the structure will need to be re-installed.
2 | Page
Becky continues to compile all expenses related to the storm damage for the FEMA grant
reimbursement. The documentation will be submitted once all work has been completed and
the associated invoices have been received.
City Attorney – The meet and greet special session has been scheduled for September 9 at 4
pm. I’ve received the information requested from the firm and will distribute that to the
Council ahead of the meeting.
IT/Phones/Internet – IT Strategies has been working on implementing our remote cloud
backup system. During the installation of the new software, we experienced a couple of days
of server issues, but those issues have since been resolved. IT Strategies has confirmed that
we are now receiving clean and complete backups.
I have also discussed with IT Strategies the importance of having a redundant backup as
part of our overall backup strategy. Relying on a single backup system could leave us vulnerable
if that system were to fail at the same time we experienced a server is sue. IT Strategies is
currently evaluating options for adding a redundant backup to provide an additional layer of
protection for the City's data.
Departments /Committees/Commissions
Golf Course – The Greens crew put siding on the south side of the cart barn. This low- cost
upgrade looks much better and more professional than the tarps we replaced every other year.
For the 2027 season we will look at adding barn doors on the ends to help protect the carts a
little better, specifically in the winter months.
The restaurant has requested the season -end check list and the contacts for our service
providers who generally perform our close-out/opening duties on the equipment. Every time
I’ve been in the clubhouse, the bar and restaurant appear busy. This has been a great
improvement over the past few years. I’ve heard no complaints from golfers or from the
proprietors, so I believe everything has been going well this season.
Planning Commission – The Planning Commission continued to address several zoning and
development-related matters. At its September meeting, the Commission held a public
hearing on proposed amendments to the zoning ordinance that would remove storage
buildings from permitted uses in the Highway Commercial District and from permitted-by-right
uses in the Industrial District, instead allowing them as a conditional use in the Industrial
District. The Commission also continued its review of the proposed recreational trail easement
for the River Trail, including questions regarding utility access and maintenance
responsibilities. The Commission also reviewed a request from the SnoEagles for a new
groomer shed at the City’s DPW property.
The Commission continued its review of proposed stormwater management and drainage
ordinance changes intended to provide clearer standards for managing runoff from
development and land-disturbing activities. The proposed ordinance would address potential
flooding, ponding, erosion, and drainage impacts on neighboring or downstream properties by
establishing thresholds for when stormwater management requirements would apply. Typical
3 | Page
one- and two-family residential construction involving less than one acre of land disturbance
would generally be exempt, provided there is no adverse drainage impact. The ordinance also
establishes maintenance and corrective -action requirements and incorpo rates applicable
state stormwater and erosion-control standards. A public hearing was anticipated for later in
the fall. The version presented to the Commission was only a first draft for discussion purposes.
Public Works – The first employee who had been off work for medical reasons has returned to
work. As of August 31, 2026, he was released from light duty and returned to his regular full -
time duties. Another employee who was injured on the job has surgery scheduled for mi d-
September. He anticipates being off work for approximately three weeks following surgery
before returning on light duty. He expects to be able to resume regular duty by the start of the
winter season.
DPW report on the previous month’s activities attached to this report (Appendix A)
2026 Projects
Hwy 45 Xing – The committee has continued to meet regularly to finalize the kiosk and map
components of the project. Equipment is being purchased to fulfill the requirements of ERRP’s
grant, and the committee anticipates that the kiosk will be installed later this year.
The committee is also working to identify several project-related items that they would like
to include in the City’s 2027 capital improvement bidding process. ERRP will reimburse the City
for the associated costs. I will work with the committee to work through the details, with a
formal proposal expected to be presented to the City Council for consideration in October or
November.
Dog Park – The Veterans Resource Center (VRC) has a signed offer to purchase the property at
1100 N. Railroad Street from Aspirus for development of a veterans ’ memorial park, with
closing anticipated later this month. At the Council meeting, Denny Geiseman will provide
additional information regarding the potential addition of a dog park to the property. Following
the presentation, the Council can consider whether the City would like to partner with the VRC
on this community amenity, or if they prefer one of the other locations presented at the last
meeting.
2026 Street Project – Due to the delayed bidding process, which was necessary to allow time
for the State -Municipal Agreement with WisDOT for the First Street project (and despite
waiting, was still not received in time) , several of our projects are getting a later start than
anticipated this year. As a result, the City’s chipsealing work will be postponed until spring
2027, and the contractor will honor the 2026 pricing. This will include the planned double -
chipsealing of the parking lot behind BMO.
Safe Streets 4 All Grant – Still waiting for the agreement from the Federal government. My
point of contact indicated that the agreement is anticipated to be received by the end of the
year.
4 | Page
Appendix A – Public Works Department for the Previous Month
Submitted by Brad Adamovich
During the month of August, the DPW completed a variety of road maintenance tasks, including,
but not limited to, storm debris clean up, ditch mowing, street sweeping, and road patching.
DPW crew also attended the National Night Out event to engage with the community.
DPW received very few sewer calls during the month. No sewer calls that were received were a
result of an obstruction in a main city sewer line.
Broad overview of DPW work activity during the month:
• Patch streets, alleys, and parking lots with cold patch asphalt
• Mow and general park and ROW grounds maintenance
• Locates of Sanitary Sewer and Storm Drains for Diggers Hotline
• Swept Streets with Pelican and Whirlwind sweepers
• Sign repairs and replacement of damaged signs
• Maintenance of municipal buildings
• Picked up animal road kills
• Delivered and picked up signage and barricades for events held within the city
• Broomed off roads/intersections/trail crossings/parking lots
• Graded UTV trail
• Emptied and monitored yard waste disposal dumpster
• Maintenance of machinery
• Jetted sewer mains for cleaning and maintenance
• Continued trap, neuter, return program of the stray cats
• Graded gravel streets
• Reviewed bills/invoices for the city and approved accordingly
• Trimmed overhanging trees within ROWs
• Trapped nuisance animals
• Distributed Grass warnings to properties in violation of the city ordinance
• Completed weed control measures on bridge, median, and sidewalks
• Assisted farmers market and revitalization when needed
• Repaired shoulder washouts
• Repaired catch basins and manholes
• Dispersed paper products to all parks, beaches, and buildings
• Trimmed grass/weeds in ditch lines
• Cleaned roof and drains of City Hall
• Completed repairs to barricades
• Repaired concrete slab near Bluebird on the UTV trail
• Installed downspout extension at Depot
• Coordinated with contractor on repairs of Riverview bathroom
• Completed snow removal impact analysis for council members
• Repaired bathroom locks at Beach
• Repaired bathroom shower head at Beach
• Collected temporary signs illegally placed in City ROW
5 | Page
• Removed and replaced wheels from Backhoe for tire replacement
• Began replacing roof of ice-skating rink shelter
• Cut tree down in alley behind Nicolet Bank
• Updated and edited online GIS sanitary and storm sewer mapping for accuracy
Ordinance No. ________ – Storage Facilities Zoning Amendment
ORDINANCE NO. 607
AN ORDINANCE AMENDING THE CITY OF EAGLE RIVER ZONING ORDINANCE
REGARDING STORAGE BUILDINGS NOT USED FOR HABITATION - HUMAN OR
ANIMALS
WHEREAS, the City of Eagle River has adopted zoning regulations governing the location and
use of land and structures within the City; and
WHEREAS, the City Council finds that storage buildings not used for habitation – human or
animals are more appropriately located within areas designated for Industrial uses than within the
Highway Commercial zoning district; and
WHEREAS, the City Council desires to amend the zoning use regulations to remove storage
facilities (not for human or animal habitation) from the list of uses allowed by conditional grant
in the Highway Commercial zoning district, remove such use from the list of uses permitted by
right in the Industrial zoning district, and add such use to the list of uses allowed by conditional
grant in the Industrial zoning district; and
WHEREAS, the City Council has considered the recommendation of the Plan Commission and
any public hearing or other procedures required by Wisconsin law and the City's zoning
ordinance.
NOW, THEREFORE, BE IT ORDAINED by the City Council of the City of Eagle River,
Wisconsin, as follows:
SECTION 1. AMENDMENT TO HIGHWAY COMMERCIAL ZONING DISTRICT.
The City of Eagle River Zoning Ordinance, Section 106-473, relating to the Highway
Commercial zoning district and its uses permitted by conditional grant, is hereby amended to
remove the following use:
Storage buildings not used for habitation – human or animals
SECTION 2. AMENDMENT TO INDUSTRIAL ZONING DISTRICT – USES
PERMITTED BY RIGHT.
The City of Eagle River Zoning Ordinance, Section 106-502, relating to the Industrial zoning
district and its uses permitted by right, is hereby amended to remove the following use:
S
torage buildings not used for habitation – human or animals
Ordinance No. ________ – Storage Facilities Zoning Amendment
SECTION 3. AMENDMENT TO INDUSTRIAL ZONING DISTRICT – CONDITIONAL
GRANT.
The City of Eagle River Zoning Ordinance, Section 106-503, relating to the Industrial zoning
district and its uses permitted by conditional grant, is hereby amended to add the following use to
the list:
Storage buildings not used for habitation – human or animals
SECTION 4. NO OTHER CHANGES.
Except as expressly amended by this Ordinance, all other provisions of the City of Eagle River
Zoning Ordinance shall remain in full force and effect.
SECTION 5. SEVERABILITY.
If any provision of this Ordinance is determined by a court of competent jurisdiction to be
invalid or unconstitutional, such determination shall not affect the validity of the remaining
provisions of this Ordinance, which shall remain in full force and effect.
SECTION 6. EFFECTIVE DATE.
This Ordinance shall take effect upon its passage and publication as required by law.
ADOPTED this _____ day of ____________________, 2026.
CITY OF EAGLE RIVER, WISCONSIN
________________________________________
Debra A Brown, Mayor
________________________________________
Becky Bolte, Clerk
PERPETUAL RECREATIONAL TRAIL EASEMENT AGREEMENT
This Perpetual Recreational Trail Easement Agreement is made this ___ day
of ______ , 2026, by and between the City of Eagle River, Vilas County,
Wisconsin, hereinafter referred to as "City"; and the River Trail Commission, hereinafter
referred to as "Commission";
WHEREAS, City owns real property located in the City of Eagle River more
particularly described on Exhibit A attached hereto and incorporated herein by
reference; and
WHEREAS, Commission desires to acquire a permanent and perpetual exclusive
recreational trail easement over, across and through a certain portion of property as
shown on Exhibit B attached hereto and incorporated herein by reference with the right
of entry in and across the property; and
WHEREAS, City desires to provide a recreational trail easement to enhance
tourism in this area;
NOW, THEREFORE, in consideration of the promises contained herein, THE
CITY AND COMMISSION AGREE AS FOLLOWS:
1. Recitals. The above-referenced recitals are correct and hereby incorporated
by reference.
2. Grant of Easement. City grants and conveys unto Commission a permanent,
exclusive recreational trail easement over, across and through that portion of the real
estate owned by City for the construction, operation, use, maintenance, repair, and
reconstruction of a recreational trail specifically for the purposes of hiking and a bike
path. It should also be noted that the City of Eagle River Light & Water has lines
beneath Exhibit A and should the City of Eagle River Light & Water Department be
required to maintain or reconstruct their water lines, Light & Water shall not be
responsible for any damaged trail infrastructure as a result of any maintenance or
construction required on underground utilities and the Commission shall be responsible
to restore the surface area to the condition that previously existed prior to the
maintenance.
3. Right of Entry. City consents to the entry by the servants, employees,
workers, agents, or independent contractors of Commission for and incidental to the
construction, operation, use, maintenance, repair, and reconstruction of the easement
area and entry by the general public for use of the recreational trail, but reserves the
right to make such use of the land included in the easement area which will not disturb
or interfere with such recreational trail or prevent ingress or egress thereto for the
purpose of construction, operation, use, maintenance, repair, or reconstruction thereof.
1
4. Interference. Commission shall submit plans for the construction of the bike
trail over Exhibit A to the City for their comment, alteration or modification.
5. Venue and Governing Law. This Agreement shall be governed in all
respects, whether as to validity, construction, capacity, performance, or otherwise, by
the laws of the State of Wisconsin.
6. Indemnification. Commission, its successors, heirs, and assigns hereby
indemnifies and holds harmless the City and its elected and appointed officials, officers,
employees, and authorized representatives from and against any and all suits, actions,
legal or administrative proceedings, claims, demands, damages, liabilities, interest,
attorneys' fees, costs, and expenses of whatsoever kind or nature ("Claims") which
might arise or be asserted against the City from the construction, presence, existence,
or maintenance of the Easement or recreational trail by the Commission or the City,
except that this provision shall not apply to the extent that the Claims result from or
arise out of the sole negligence or willful misconduct of the City or its elected and
appointed officials, officers, employees, or authorized representatives. In the event a
Claim subject to indemnity under this provision is asserted against the City, its elected
and appointed officials, officers, employees, or authorized representatives, the City shall
promptly notify the Commission, and the Commission shall defend, at its own expense,
any suit based on such Claim. If any judgment or Claims subject to indemnity under this
provision against the City, its elected and appointed officials, officers, employees, or
authorized representatives shall be allowed, the Commission shall pay for all costs and
expenses in connection herewith.
7. Binding on Future Parties. This Agreement shall run with the Property and
shall be binding upon and inure to the benefit of the parties hereto, their respective
heirs, administrators, successors, and assigns. That should either of these municipal
entities as parties to this agreement cease to exist at some point in the future, this
agreement shall become null and void and terminate any easement granted herein.
8. Entire Agreement; Modification; Recording. This agreement shall be
recorded with the Vilas County Register of Deeds and constitutes the entire agreement
of the parties with respect to the subject matter hereof and the easements herein
granted shall be perpetual in duration and, except as provided for herein, shall not be
changed, altered, modified or amended, except by an instrument in writing executed by
the City and the Commission, or each of their respective heirs, successors, or assigns,
and recorded with the Vilas County Register of Deeds.
9. Enforcement. This Agreement may be enforced by proceedings at law or in
equity by or against the parties hereto and their respective successors in interest.
10. Severability. Invalidation of any one of the provisions of this Agreement
shall in no way affect any other provisions and all other provisions shall remain in full
force and effect.
2
11. Counterparts. This Agreement may be executed in one or more
counterparts, each of which shall be deemed an original, and all of which together shall
constitute one and the same instrument.
12. No Liens. No party to this agreement shall permit any claim, lien or other
encumbrance arising from any party's use of the easement referenced herein to accrue
against or attach to the property of any other party to this agreement.
13. Authority to Sign. The undersigned persons executing this document on
behalf of the Commission and City represent and certify that they are fully empowered
to execute and deliver this document; that Granter has full capacity to convey the real
estate interest described here; and that all necessary action for the making of such
conveyance has been taken and done.
14. Trail Closure. City has the right to temporarily close the trail to the general
public for construction, maintenance activities, flooding, or weather-related conditions or
accumulation.
IN WITNESS WHEREOF, the parties have executed this agreement on the day,
month and year first above written.
Drafted By:
Steven C. Garbowicz, Attorney at Law
State I.D. #1018485
221 South First Street; P.O. Box 639
Eagle River, WI 54521
715.479.6444 X 1
3
STATE OF WISCONSIN )
)ss.
COUNTY OF VILAS )
CITY OF EAGLE RIVER:
By: Debra A. Brown, Mayor
By: Becky J. Bolte, Clerk
ACKNOWLEDGMENT
Personally came before me this ___ day of _______ , 2026, the
above named Debra A. Brown and Becky J. Bolte, to me known to be the persons who
executed the foregoing instrument and acknowledged the same.
Notary Public, State of Wisconsin.
My Commission Expires: ____ _
4
RIVER TRAIL COMMISSION:
By Jim Swenson, Chairman
ACKNOWLEDGMENT
STATE OF WISCONSIN )
)ss.
COUNTY OF VILAS )
Personally came before me this ____ day of _______ , 2026, the
above named Jim Swenson, to me known to be the person who executed the foregoing
instrument and acknowledged the same.
Notary Public, State of Wisconsin.
My Commission Expires:. _____ _
5
RESOLUTION NO. 1081
A RESOLUTION HONORING DENNY GEISEMAN UPON HIS INDUCTION
INTO THE HEROES HALL OF FAME
WHEREAS, the City of Eagle River recognizes and honors individuals who have
demonstrated exceptional dedication, service, sacrifice, and commitment to their
community and country; and
WHEREAS, Denny Geiseman has distinguished himself through his service to our nation
and his continued commitment to the Eagle River community; and
WHEREAS, Denny Geiseman has demonstrated an ongoing dedication to sup
porting local
veterans through his involvement with and service to the Veterans Resource Center in
Eagle River, helping ensure that veterans and their families have access to resources,
support, and a welcoming community; and
WHEREAS, his commitment to the Veterans Resource Center reflects his belief that
service to veterans does not end when military service ends, but continues through
advocacy, support, and a willingness to serve those who have served our country; and
WHEREAS, Denny Geisem an is being inducted into the Heroes Hall of Fame in Iron
Mountain, Michigan, on Veterans Day, November 11, 2026, in recognition of his service
and contributions; and
WHEREAS, this prestigious honor reflects not only upon Denny Geiseman, but also upon
the City of Eagle River and the many peop le whose lives have been positively impacted by
his dedication and service; and
WHEREAS, the City Council of the City of Eagle River believes it is appropriate to publicly
recognize and express its gratitude to Denny Geiseman for his service, accomplishments,
dedication to local veterans, and the example he has set for others.
NOW, THEREFORE, BE I T RESOLVED, that the Mayor and City Council of the City of Eagle
River hereby extend their sincere congratulations and appreciation to Denny Geiseman on
his induction into the Heroes Hall of Fame.
BE IT FURTHER RESOLVED, that the City of Eagle River proudly recognizes Denny
Geiseman’s service to our country, his dedication to veterans in our community, and his
contributions through the Veterans Resource Center, and extends its best wishes to him
and his family as he receives this well-deserved honor on Veterans Day 2026.
Adopted this ___ day of __________, 2026.
CITY OF EAGLE RIVER
____________________________________________________
Debra A Brown, Mayor
____________________________________________________
Becky Bolte, Clerk
Option#1: We discovered that the City owns a 1.7 acre parcel at the end of Railroad Street on Fern
Street. The area would require some fill in one lower lying area, which DPW has informed me is available
in their yard. This area will provide a large dog park with two areas (small & large dog areas), and plenty of
room for parking. A sand point hand-pump well can be installed to provide water for dogs. With the area
being away from other parks and traffic, we may not need the coyote rollers, leaving more funding for the
fencing and well. This will retain the field behind City Hall for the Lions future plans, the little league t-ball
group that uses the backstop, and snow storage in the winter, plus all of the other activities and usage the
field sees throughout the summer months.
DOG PARK - LOCATION OPTIONS
Option#2: Push the dog park back to the skating rink area and create two areas (small & large dog
areas). Move skating rink to Silver Lake Beach. This will retain the field behind City Hall for the Lions
future plans, the little league t-ball group that uses the backstop, and snow storage in the winter, plus all
of the other activities and usage the field sees throughout the summer months
Option#3: Miller Park on Minnesota Street is going to require some investment in the coming years on
the aging playground equipment. There is enough space back there to move the playground equipment
over and re-design the remaining .75 acres to put in two areas (small and large dogs). This will retain the
field behind City Hall for the Lions future plans, the little league t-ball group that uses the backstop, and
snow storage in the winter, plus all of the other activities and usage the field sees throughout the summer
months
Option #4 – This property is owned by Trackside. The owners would be willing to trade the City for the
section of frontage (they currently rent from the City), in exchange for a one-acre parcel and naming
rights on the dog park. This will retain the field behind City Hall for the Lions future plans, the little league
t-ball group that uses the backstop, and snow storage in the winter, plus all of the other activities and
usage the field sees throughout the summer months
Option #5 – Indiana Street. The neighboring parcel to the north is also owned by the City, which could
expand the available property to 1.62 acres; however , the attorney at Aspirus that I was working with to
remove the deed restriction is no longer with Aspirus, and I’m trying to re-establish a connection with
their legal department. This will retain the field behind City Hall for the Lions future plans, the little league
t-ball group that uses the backstop, and snow storage in the winter, plus all of the other activities and
usage the field sees throughout the summer months
Option #6: Request a portion of Riverside Park to be used as a joint effort between Vilas County and
Eagle River to be used as a dog park. This option will be brought up to the Vilas County Fairgrounds and
Riverside Park Complex Committee.
Option #7 – A group of private individuals is working to purchase the property along Bluebird and
Airport Roads, where the self-storage facility has been proposed earlier this summer . They would like to
erect a veterans memorial, but since the parcel is 2.75 acres, may also be open to sharing the property
with a dog park. A representative from the Veterans Resource Center will be at the meeting to discuss the
LARGE DOG AREAAPPROX. 0.76 ACRESMALLDOGAREASHELTERDOUBLE GATE ENTRYSEE DETAILSFUTURE
E.R. CITY HALLGREMBAN DOG PARK - SITE PLAN
TOTAL FENCE PERIMETER = 1080'+-MAINT. GATE SEE DETAILS160'70'230'MAINT. GATE SEE DETAILS
Reduction of snow capacity behind City Hall - Financial and service impact on DPW snow removal
Added time due to further # of employees Additional Ave.Winter with Add. Fuel for Total Ave.
Snow Amount travel to dump sitepicking up snowwages each time15 pickups 15 pickupswinter increase
4" pickup 2 hours 5 $450-675 6,750-10,125 4,500 11,250-14,625
6" pickup 3 hours 5 $675-1,012 10,125-15,180 6,750 *16,875-21,930*Most likely range
8" pickup 4 hours 5 $900-1,350 13,500-20,250 9,000 22,500-29,250
10" pickup 5 hours 5 $1,125-1,687 16,875-25,305 11,250 28,125-36,555
12" pickup 6 hours 5 $1350-2,025 20,250-30,375 13,500 33,750-43,875
Alterative option: Hire additional outside trucks @ $140-$160 per hour. Each 6" Pickup would be approx. $1,000 per truck = $15,000 +/- per truck/year
Other considerations:
More Wear, Tear, Deterioration on machines
More fatigue for employees
Lowered safety due to increased crossing/driving on busy streets
Delayed clearing of roads resulting in more disgruntled citizens
Math used to calculate:
Fuel Costs: Estimated at $150 per additional hour for 6 machines used for pickup (3 dump trucks, blower, loader, and grader)
1/3 of our snow loads go to City Hall field. Potential 50% reduction of capacity from dog park and inevitable park expansion
4" pickup = 120 truck loads total. Divided by 1/3 = 40 loads to city hall.
50% reduction of capacity means 20 loads will need to go 6 minutes round trip further = 120 additional minutes
6" pickup = 180 truck loads total. Divided by 1/3 = 60 loads to city hall.
50% reduction of capacity means 30 loads will need to go 6 minutes round trip further = 180 additional minutes
8" pickup = 240 truck loads total. Divided by 1/3 = 80 loads to city hall.
50% reduction of capacity means 40 loads will need to go 6 minutes round trip further = 240 additional minutes
10" pickup = 300 truck loads total. Divided by 1/3 = 100 loads to city hall.
50% reduction of capacity means 50 loads will need to go 6 minutes round trip further = 300 additional minutes
12" pickup = 360 truck loads total. Divided by 1/3 = 120 loads to city hall.
50% reduction of capacity means 60 loads will need to go 6 minutes round trip further = 360 additional minutes
*Wage ranges are based on employee average of regular rate and OT rate-including fringe benefits. Each pickup typically includes a mix of both types of wages
DPW input regarding implications and considerations for dog park location behind City Hall:
• DPW currently uses 3 privately owned dump sites. Behind Trigs, Visner Parking Lot, and
Track Side Lot. What if we lose any of these lots due to sale, construction, or just non -
renewal of permission to dump snow on these lots. The city does not have any ad ditional
cleared lots for snow removal. Where will we make up the additional snow dumping area?
• Early winter and late winter, we need hard surfaces to dump snow as the ground
is soft and we sink and get stuck on soft surfaces. We need the ability to dump snow on
the asphalt driveway off 3 rd street as well as the graveled roadbed along the tree line of
Silver Lake Rd.
• Financial and safety considerations if we need to haul further to other dump sites:
o More OT, more fuel, more wear/tear on trucks, longer hours for DPW. Depending
on the added distance, this could add several hours to each pick up. This is a safety
hazard as DPW staff already works extensive hours for any snowfall. Additionally,
this would reduce the turn time for making all roads safe for the community
during winter.
o FYI, currently an 8” snowfall takes 8 -10 hours to pick up (200-250 truckloads of
snow); this doesn’t include outline plowing which is usually another 6 -8 hours after
pickup. Adding further distance to a dump site will result in additional time needed to
haul each load, resulting in additional time needed to pick up or additional hiring
of dump trucks needed to haul.
o To push the snow up higher, to create more space to accommodate the dog park, a
new piece of equipment would be required. The crew pushes the snow up as high as
possible with existing equipment.
• Approximately 1/3 of our loads get dumped behind City Hall (67-84 loads per 8” snowfall)
• If an alternate dump site takes 4 minutes longer per round trip that is an increase of an
average of 4.5 to 5.5 additional hours added to just the pick up portion of our job. This
would delay additional outline plowing by that time as well, further fatigue of workers and
drastically increase the risk of accidents occurring.
• This could be mitigated by hiring outside truck drivers, however that would be at a
substantial additional cost to the City.
• Safety considerations for alternate snow sites: Crossing Pine Street or Bridge Street is
significantly more dangerous for truck drivers who have limited visibility after being loaded
with snow.
• Safety consideration: Proximity to children’s park and loose dogs & wandering children
to the dog area (fingers through fence).