Please note that, upon reasonable notice, at least 24 hours in advance, efforts will be made to accommodate the needs of
disabled individuals through appropriate aids and services or provide a video link for meetings. For additional information to
request this service, please contact the City Clerk's Office at 715-479-8682 ext. 224,
525 E. Maple Street, P.O. Box 1269, Eagle River WI 54521.
AGENDA NOTICE (6/24/2026)
THE PLANNING COMMISSION OF THE CITY OF EAGLE RIVER WILL HOLD A MEETING ON
THURSDAY, JULY 2, 2026, AT 5:00 P.M. AT CITY HALL, 525 E. MAPLE STREET IN EAGLE RIVER.
Notice is hereby given that a majority of the City Council of the City of Eagle River may be attending scheduled
Planning Commission meetings either in person or via zoom. This constitutes a meeting of the City Council
pursuant to State ex rel. Badke v. Greendale Village Bd., 173 Wis. 2d 553, 494 N.W.2d 409 (1993), and must be
noticed as such, although the Council will not take any formal action at these meetings.
This meeting will be available by Zoom at the following link:
https://us06web.zoom.us/j/85111695208?pwd=x5pMv8crrbsPuYwefObTYbJG0m83b3.1
Meeting ID: 851 1169 5208
Passcode: 963936
1) Call to Order.
2) Roll Call.
3) Approval of minutes.
4) Public Hearings, discussion and possible action on the following agenda item(s):
a) Conditional Use Permit Public Hearing - Continuation: Request by Amerco Real Estate Company/U-
Haul for a conditional use permit to construct two (2) self- storage units totaling 51,977 square
feet at 1100 N. Railroad Street, Eagle River, computer number 221 -1019-06, in accordance with
Chapter 106, Article VI, Division 7, Sec 106 -473 Uses permitted by conditi onal grant, (8) Storage
buildings not used for habitation – human or animal.
b) Conditional Use Permit Public Hearing: The Vilas County Fair Board has submitted a request for a
conditional use permit to allow camping by circus workers at the Vilas County Fairgrounds, July
13-15, 2026. The Vilas County Fairgrounds property, Parcel 221 -182, 133 South Forrest Street, is
described as Sect. 32, T40N,R10E, MILL LOT 1 COUNTY CLERK'S PLAT GOVT LOT 1 & PRT SE NE EXC
23-382,196-598,580174, 584885 RESOLUTION 441482.
c) Conditional Use Permit Public Hearing: The Vilas County Fair Board has submitted a request for a
conditional use permit to allow camping by carnival workers at the Vilas County Fairgrounds during
the County Fair, August 13 -16, 2026, with additional shoulder dates as required for set- up/tear-
down of the fair attractions. The Vilas County Fairgrounds property, Parcel 221 -182, 133 South
Forrest Street, is described as Sect. 32, T40N,R10E, MILL LOT 1 COUNTY CLERK'S PLAT GOVT LOT
1 & PRT SE NE EXC 23-382,196-598,580174, 584885 RESOLUTION 441482.
d) Rezoning Public Hearing : Resolution to consider the rezoning and subsequent change to the
Comprehensive Plan of the City of Eagle River, for Elm Drive properties listed below from
Parks/Recreation to Office/Residential zoning classification
:
i) Tuff: Parcel #221 -1058-5801, 1020 Elm Drive, SE -SE,Sect. 33, T40N,R10E, PRT SE SE. Full
description in tax roll.
ii) Hom: Parcel #221-1058-6012, SE-SE,Sect. 33, T40N,R10E, LOT 3 22CS212 CSM 5874 PRT SE SE.
Full description in the tax roll.
iii) Buskager: Parcel #221-1058-6011, 1025 Elm Drive, SE-SE,Sect. 33, T40N,R10E, LOT 2 22CS212
CSM 5874 FKA PRT SE SE EXC 540834.
e) Information Only - Meadows – Withdrawal of request to purchase City-Owned Parcel Adjacent to
655 N Bond.
5) Adjournment.
Robin Ginner, City Administrator
June 4, 2026
A meeting of the Plan Commission of the City of Eagle River was called to order at 5:00pm by Mayor Deb
Brown.
Roll Call: Alex Forer, Mary Horant, Brad Adamovich, Adam Grassl, John Hletko, Kim Schaffer and Deb
Brown. Also in attendance Robin Ginner and Becky Bolte.
Motion by Horant, 2
nd by Hletko to approve the minutes of the 5-7-2026 meeting. Carried, all.
a) Conditional Use Permit Public Hearing Continuation: Request by Amerco Real Estate Company/U-Haul
for a conditional use permit to construct two (2) self-storage units totaling 51,977 square feet at 1100 N.
Railroad Street, EagleRiver, computer number 221-1019-06, in accordance with Chapter 106, Article VI,
Division 7, Sec 106-473Uses permitted by conditional grant, (8) Storage buildings not used for habitation
– human or animal. Shawn Odden, representative for U-Haul Company of WI, was present. Ginner
reported that updated engineering plans by Vreeland Associates Land Surveyors and Engineers had been
supplied to the city. Justin Vreeland answered questions regarding the updated plans. Erosion
Control/Storm Water Management/Maintenance/Operation plan, landscaping plan, lighting and siding
samples were presented. Mayor Brown opened the floor for public comments at 5:20PM with two
minute time limits for public comments. The public hearing included extensive testimony from
approximately 16 residents and business owners who opposed the project, citing concerns about
aesthetics, impact on local businesses, and potential flooding issues. Mayor Brown closed the public
comments portion of the public hearing at 5:45PM. Discussion on key concerns raised included the
storage units' impact on property values, visual appearance conflicting with the Northwoods aesthetic,
and potential infrastructure damage from removing 6 feet of fill material during construction. Vreeland
explained their stormwater management plan involving infiltration basins and ditches. MSA Engineering
has not had ample time to review the engineering plans for the city. The commission discussed the
constraints of Wisconsin Act 67, which put limitations on denying conditional use permits. Bluebird Road
business owners, including Jay Stock from Tribute Brewing Company and Jay Johnstone and Vito
Bortolotti from Bortolotti's Cin Cin, requested additional time to obtain property appraisals to assess the
financial impact on their businesses. The commission acknowledged the strong public opposition but
noted the legal constraints around denying permits based on aesthetics/opinions alone, while expressing
concerns about the project's impact on local businesses in the BID district and the need for proper
stormwater management. Discussion. Motion by Hletko, 2
nd by Horant to schedule a special Planning
Commission meeting on June 17, 2026, to give business owners and city engineers time to do due
diligence. Carried on a roll call vote, all.
b) Final Plan Review – Bike/Pedestrian crossing at Bridge & Spruce Streets (GHT & ERRP) Laura
VanValkenberg, President of Great Headwaters Trails Foundation, and JoAnn Simmons, Executive Director
of Eagle River Revitalization Program presented DOT ready plans set for submission as drawn by Becher
Hoppe. Aaron Wallner of Becher Hoppe was available via zoom for questions. Discussion. Motion by
Grassl, 2
nd by Forer to recommend final plan review approval to City Council for the bike/pedestrian
crossing at Bridge and Spruce Steets pending timing of the construction is coordinated with the city, any
alteration or destruction of existing sidewalks along Railroad St is coordinated with the city, and push
button assemblies be installed on both the east and west side of Hwy 45 crossing as well as in the median.
Carried on a roll call vote. 4/2 Ayes: Grassl, Forer, Adamovich, Hletko Nays: Horant, Schaffer
c) Dennis Meadows, Formal Request: Purchase of City-Owned Parcel Adjacent to 655 N Bond: Meadows
has requested to purchase 60’ of frontage at the T-docks of city owned land directly across from his
family owned parcel at 655 N Bond. Meadows presented an affidavit from 1944 regarding the Lake Park
Addition and parties M.D. Hirzel and G.F. Bond. Discussion with petitioner Dennis Meadows, Commission,
and the public. Ginner reported that Attorney Garbowicz has advised the city not to sell requested parcel
and that adverse possession does not apply to a municipality. Motion by Grassl, 2nd by Hletko to postpone
until Meadows can provide the Commission with a full title search and the City Attorney is able to provide
legal opinion on chain of title with the information provided in the full title search. Carried on a roll call
vote, all.
d) Comprehensive Plan - Scheduling of future comprehensive plan sessions as stand-alone meetings.
Discussion. Commission to suspend the sessions for the summer and to resume Comprehensive Plan
Update meetings beginning September 17, 2026, at 5:00PM with a set two hour time limit.
e) Discussion Only on Sponsor/off-site signage displayed year-round at local facilities (ie: Snowmobile
Derby Track, Vilas County Fairgrounds) Ginner presented that there is currently no distinction in city code
between off premise signs and sponsorship signs. Ginner to research options to bring back to the
Commission.
Motion by Horant, 2
nd by Forer to adjourn at 8:03PM. Carried, all.
Legal Notice
Publish twice, beginning June 15, 2026 – Affidavit requested
NOTICE OF PUBLIC HEARING
CITY OF EAGLE RIVER PLANNING COMMISSION
Amerco Real Estate Company/U-Haul is requesting a conditional use permit to construct two (2) self-
storage units totaling 51,977 square feet at 11 00 N. Railroad Street , Eagle River, computer number
221-1019-06, in accordance with Chapter 106, Article VI, Division 7 , Sec 106-473 Uses permitted by
conditional grant, ( 8) Storage buildings not used for habitation – human or animal. The property,
zoned as Highway Commercial, is described as: Sec. 28, T40N, R10E PRT NW NW . Complete legal in
tax roll.
The City of Eagle River Planning Commission has scheduled a public hearing for Thursday, July 2, 2026
at 5 pm, located in the Eagle River Common Council Chambers, 525 E. Maple Street, Eagle River, WI
54521.
Comments can be made in person at the public hearing or by mail to City Administrator, PO. Box 1269,
Eagle River, WI 54521; by phone (715) 479- 8682 x227 or email rcginner@eagleriverwi.gov .
Documents will be available for review at City Hall. PETITIONERS, OR THEIR REPRESENTATIVES, SHALL
BE PRESENT.
1
Robin Ginner
From: Robin Ginner
Sent: Thursday, June 18, 2026 3:48 PM
To: vicwash@sbcglobal.net; COER Mayor
Subject: FW: City of Eagle River Proposed U-Haul Facility Stormwater Review
Attachments: WinSLAMM v10_UHaul_Inputs.pdf; WinSLAMM v10_UHaul_Outputs.pdf; Hauling on
substandard road research and experience.pdf; Research Summary_ Limiting Pavement
Damage from Detours _ MnDOT Digital Library.pdf; COUNTY ROAD UPGRADE AND
MAINTENANCE AGREEMENT.pdf; 6-18-26_ESTIMATE OF PROBABLY COSTS - Pulverize
and overlay option.pdf; 6-18-26_ESTIMATE OF PROBABLY COSTS - Base Replacement
option.pdf; 00088145 U-Haul Plan Review Memo.pdf
See attached and below for the recommendations from MSA on stormwater mitigation.
Thanks,
Robin
Robin Ginner
City Administrator
City of Eagle River
Note my new email address: rcginner@eagleriverwi.gov
Elected Officials and Members of City Committees: In order to comply with Open Meetings Act Requirements, please limit any reply
to only the sender of this electronic communication. Please be aware that written communication, emails and faxes are generally
considered open public records.
From: John Promer <jpromer@msa-ps.com>
Sent: Thursday, June 18, 2026 3:17 PM
To: Robin Ginner <rcginner@eagleriverwi.gov>
Subject: City of Eagle River Proposed U-Haul Facility Stormwater Review
Hello Robin,
We have completed reviewing the U-Haul Stormwater plans and have several observations and
recommendations we outline in the attached technical memo and supporting reference attachments.
I reached out to our stormwater experts for additional input.
The basic highlights from the review are:
Is that design does meet current code ( NR 151) for 1 & 2 year stormwater events, meets the
infiltration and suspended solids requirements; and is therefore suƯicient.
Some of their stormwater modeling shows outputs that diƯer from other modeling, report, and the
plans. As a result it should be updated and results further explained.
2
We recommend adding the bio-filtration areas to the sides of the basins in addition to the bottoms
of the basins.
We recommend adding an equalization culvert under one of the entrances.
We recommend adding fractured rip rap at the ends of culverts.
We recommend the biofiltration area at the bottom of the basins be extended to include the sides
of the infiltration basins. As well as adding note that the detail applies to all of the infiltration basins.
We recommend adding a fence around the infiltration basins to protect from public’s entry.
Properties to the west of Bluebird road are at or below the road’s current elevation.
Regrading and or a combination of grading and infiltration basins are recommended on
these properties.
Further mitigation of stormwater onto these properties could include adding curb and
gutter and associated storm sewer to the streets.
Would you be able to share the time for the meeting discussing this on July 2nd ? 5pm?
If you have additional questions, please let us know.
Have a great rest of the day,
John
John Promer, P.E. | Project Engineer, Public Works
Licensed in WI & MI
MSA Professional Services, Inc.
100% Employee Owned
+1 (715) 304-0415
1835 NORTH STEVENS STREET, RHINELANDER, WI 54501
P (715) 362-3244 TF (800) 362-4505
WWW.MSA-PS.COM
Page 1 of 2
G:\00\00088\00088145\Documents\U-Haul Stormwater Review\00088145 U-Haul Plan Review Memo.docx
Memo
To: City Of Eagle River
From: John Promer - MSA Professional Services Inc.
Subject: U-Haul Storm Water Management Review
Date: June 17, 2026
MSA has recently been retained by the City of Eagle River to provide Stormwater Mangement
plan review for the planned U-Haul Development along North Bluebird Road and Airport Road
located within the City of Eagle River.
The recommended materials and design considerations outlined in this memorandum are
based on the exhibits provided to MSA on May 29, 2026. This document is intended to serve
as a general guide and standard for use during the design phase of the project. Final design
details, specifications, and construction methods will be subject to review and approval by the
City of Eagle River and applicable reglatory agencies.
Recommended Erosion Control Materials:
Erosion Control Blanket: (Class 1 Type B, Urban)
o For 4:1 or Steeper Slopes that are to be mowed.
o Bio-Degradeable double netting.
o Bio-Degradeable Stakes/Staples.
o Erosion blanket shall be from the DOT Erosion Control PAL acceptability list.
Observations & Reccomendations:
It was observed that there is no rip rap shown at the ends of culverts.
o It would be recommended to use 100% fractured rip rap at a 6inch minus gradation.
It was observed from proposed site plan that the basins are approximately 4feet deep and that
there is no fencing around the infiltration basins to protect them. o It is recommended that a fence be installed around the infiltration basins to protect public
safety and to discourage unauthorized public access to the infiltration basins. This is
particularly from adjacent roadways and the nearby snowmobile/ATV trail.
It was observed that there is no equalization culvert under the southern most entrance. o It is recommended that a properly sized culvert be added.
It was observed in the Stormwater Management Plan that the current analysis indicates a pre-
development 100-year peak discharge of 1.04 cfs, while the post-development 100-year peak
discharge from the report is 4.26 cfs peak.
MEMO
June 17, 2026
Page 2 of 2 G:\00\00088\00088145\Documents\U-Haul Stormwater
Review\00088145 U-Haul Plan Review Memo.docx
o As noted above, the report includes the 100-yr post-development flow as 4.26 cfs.
However, the HydroCAD report indicated the outlet flow is 7.30 cfs for the 100-yr event.
Please update the report or provide justification for the 4.26 cfs result.
o Additional stormwater management measures should be evaluated to further attenuate
peak flows and minimize the increase in 100-yr discharge from the site to the maximum
extent practical. o Vilas County does not have additional post-construction requirements from NR 151.
Therefore, only the 1-yr 24-hr and 2-yr 24-hr storm events are regulated. Given the HSG
A soils at the site, meeting the 100-yr 24-hr pre- vs post-construction flows is difficult.
The proposed basins total area is greater than the required 2% of the project site.
Therefore, the design is sufficient to meet NR 151 requirements if additional measures
are not feasible.
It is unclear what mitigation factors are to be used after the infiltration basins overflow as shown
in detail on sheet C7 of the proposed stormwater plan and detail.
o It is recommended to add clarity and further address the overflow discharge.
o Include the location of the emergency overflows on the plans, including dimensions and
elevations. Indicate overtopping flow paths or entrance points to municipal systems.
Weir velocities shown in HydroCAD do not exceed 2 fps during the 100-yr storm, so
vegetated or paved flow paths will be sufficient.
WinSLAMM inputs do not match HydroCAD or the plans. See the attached WinSLAMM output
for correct inputs. The solution shows a TSS reduction of 93.01% and infiltration of 92.20%.
Therefore, the design is sufficient. Please update the results in the report accordingly.
Update the plans to note that the infiltration basin detail is for all basins, or provide details for all.
Include a separate detail for basins P3 and P4, to show the shared overflow spillway between.
Observations Regarding Adjoining properties to the West of the proposed U-Haul Development
Properties to the west of the proposed development along Bluebird road are at or below the
existing road elevation.
o Additional stormwater management measures are recommended to prevent additional
runoff impacts
Such as recommend regrading areas, Infiltration Basins, and/or adding
additional stormwater management features to the properties to the west of
Bluebird Road and to the proposed development.
Additional features for stormwater control before it enters the properties could
include regrading road for addition of curb and gutter, and storm sewer.
John Promer P.E.
Project Engineer
MSA Professional Services, Inc.
Data file name: C:\Users\mamundson\OneDrive - MSA Professional Services, Inc\Desktop\Offline Projects\Eagle River UHaul Review\UhaulWaterQuality.mdb
WinSLAMM Version 10.4.1
Rain file name: C:\WinSLAMM Files\Rain Files\WI_Multi_rain\GreenBay\WisReg - Green Bay WI Annual 1969.ran
Particulate Solids Concentration file name: C:\WinSLAMM Files\v10.1 WI_AVG01.pscx
Runoff Coefficient file name: C:\WinSLAMM Files\WI_SL06 Dec06.rsvx
Residential Street Delivery file name: C:\WinSLAMM Files\WI_Res and Other Urban Dec06.std
Institutional Street Delivery file name: C:\WinSLAMM Files\WI_Com Inst Indust Dec06.std
Commercial Street Delivery file name: C:\WinSLAMM Files\WI_Com Inst Indust Dec06.std
Industrial Street Delivery file name: C:\WinSLAMM Files\WI_Com Inst Indust Dec06.std
Other Urban Street Delivery file name: C:\WinSLAMM Files\WI_Res and Other Urban Dec06.std
Freeway Street Delivery file name: C:\WinSLAMM Files\Freeway Dec06.std
Apply Street Delivery Files to Adjust the After Event Load Street Dirt Mass Balance: False
Pollutant Relative Concentration file name: C:\WinSLAMM Files\WI_GEO03.ppdx
Source Area PSD and Peak to Average Flow Ratio File: C:\WinSLAMM Files\NURP Source Area PSD Files.csv
Cost Data file name:
If Other Device Pollutant Load Reduction Values = 1, Off-site Pollutant Loads are Removed from Pollutant Load % Reduction calculations
Seed for random number generator: -42
Study period starting date: 01/02/69 Study period ending date: 12/28/69
Start of Winter Season: 12/02 End of Winter Season: 03/12
Date: 06-17-2026 Time: 16:28:01
Site information:
LU# 1 - Commercial: Commercial 1 Total area (ac): 0.421
1 - Roofs 1: 0.268 ac. Pitched Connected PSD File: C:\WinSLAMM Files\NURP.cpz
13 - Paved Parking 1: 0.110 ac. Connected PSD File: C:\WinSLAMM Files\NURP.cpz
51 - Small Landscaped Areas 1: 0.042 ac. Normal Sandy PSD File: C:\WinSLAMM Files\NURP.cpz
70 - Water Body Areas: 0.001 ac. PSD File:
LU# 2 - Commercial: Commercial 2 Total area (ac): 0.934
1 - Roofs 1: 0.333 ac. Pitched Connected PSD File: C:\WinSLAMM Files\NURP.cpz
13 - Paved Parking 1: 0.387 ac. Connected PSD File: C:\WinSLAMM Files\NURP.cpz
51 - Small Landscaped Areas 1: 0.200 ac. Normal Sandy PSD File: C:\WinSLAMM Files\NURP.cpz
70 - Water Body Areas: 0.014 ac. PSD File:
LU# 3 - Commercial: Commercial 3 Total area (ac): 0.081
1 - Roofs 1: 0.021 ac. Pitched Connected PSD File: C:\WinSLAMM Files\NURP.cpz
13 - Paved Parking 1: 0.007 ac. Connected PSD File: C:\WinSLAMM Files\NURP.cpz
51 - Small Landscaped Areas 1: 0.049 ac. Normal Sandy PSD File: C:\WinSLAMM Files\NURP.cpz
70 - Water Body Areas: 0.004 ac. PSD File:
LU# 4 - Commercial: Commercial 4 Total area (ac): 0.119
1 - Roofs 1: 0.034 ac. Pitched Connected PSD File: C:\WinSLAMM Files\NURP.cpz
51 - Small Landscaped Areas 1: 0.078 ac. Normal Sandy PSD File: C:\WinSLAMM Files\NURP.cpz
70 - Water Body Areas: 0.007 ac. PSD File:
LU# 5 - Commercial: Commercial 5 Total area (ac): 0.975
1 - Roofs 1: 0.513 ac. Pitched Connected PSD File: C:\WinSLAMM Files\NURP.cpz
13 - Paved Parking 1: 0.331 ac. Connected PSD File: C:\WinSLAMM Files\NURP.cpz
51 - Small Landscaped Areas 1: 0.105 ac. Normal Sandy PSD File: C:\WinSLAMM Files\NURP.cpz
70 - Water Body Areas: 0.026 ac. PSD File:
LU# 6 - Commercial: Commercial 6 Total area (ac): 0.180
51 - Small Landscaped Areas 1: 0.180 ac. Normal Sandy PSD File: C:\WinSLAMM Files\NURP.cpz
Control Practice 1: Biofilter CP# 1 (DS) - DS Biofilters # 1
1. Top area (square feet) = 810
2. Bottom aea (square feet) = 1
3. Depth (ft): 6
4. Biofilter width (ft) - for Cost Purposes Only: 10
5. Infiltration rate (in/hr) = 8
6. Random infiltration rate generation? No
7. Infiltration rate fraction (side): 1
8. Infiltration rate fraction (bottom): 1
9. Depth of biofilter that is rock filled (ft) 0
10. Porosity of rock filled volume = 0
11. Engineered soil infiltration rate: 13
12. Engineered soil depth (ft) = 2
13. Engineered soil porosity = 0.43
14. Percent solids reduction due to flow through engineered soil = 80
15. Biofilter peak to average flow ratio = 3.8
16. Number of biofiltration control devices = 1
17. Particle size distribution file: Not needed - calculated by program
18. Initial water surface elevation (ft): 0
Soil Data Soil Type Fraction in Eng. Soil
User-Defined Soil Type 1.000
Saturation water content percent (Porosity) = 0
Field capacity (%) = 0
Permanent Wilting Point (%) = 0
Infiltration rate (in/hr) = 13
Biofilter Outlet/Discharge Characteristics:
Outlet type: Broad Crested Weir
1. Weir crest length (ft): 5
2. Weir crest width (ft): 5
3. Height of datum to bottom of weir opening: 5
Outlet type: Surface Discharge Pipe
1. Surface discharge pipe outlet diameter (ft): 0.67
2. Pipe invert elevation above datum (ft): 3.15
3. Number of surface pipe outlets: 1
Control Practice 2: Biofilter CP# 2 (DS) - DS Biofilters # 2
1. Top area (square feet) = 6100
2. Bottom aea (square feet) = 500
3. Depth (ft): 6
4. Biofilter width (ft) - for Cost Purposes Only: 10
5. Infiltration rate (in/hr) = 8
6. Random infiltration rate generation? No
7. Infiltration rate fraction (side): 1
8. Infiltration rate fraction (bottom): 1
9. Depth of biofilter that is rock filled (ft) 0
10. Porosity of rock filled volume = 0
11. Engineered soil infiltration rate: 13
12. Engineered soil depth (ft) = 2
13. Engineered soil porosity = 0.43
14. Percent solids reduction due to flow through engineered soil = 80
15. Biofilter peak to average flow ratio = 3.8
16. Number of biofiltration control devices = 1
17. Particle size distribution file: Not needed - calculated by program
18. Initial water surface elevation (ft): 0
Soil Data Soil Type Fraction in Eng. Soil
User-Defined Soil Type 1.000
Saturation water content percent (Porosity) = 0
Field capacity (%) = 0
Permanent Wilting Point (%) = 0
Infiltration rate (in/hr) = 13
Biofilter Outlet/Discharge Characteristics:
Outlet type: Broad Crested Weir
1. Weir crest length (ft): 10
2. Weir crest width (ft): 5
3. Height of datum to bottom of weir opening: 4.5
Outlet type: Surface Discharge Pipe
1. Surface discharge pipe outlet diameter (ft): 1
2. Pipe invert elevation above datum (ft): 4.15
3. Number of surface pipe outlets: 1
Control Practice 3: Biofilter CP# 3 (DS) - DS Biofilters # 3
1. Top area (square feet) = 5000
2. Bottom aea (square feet) = 460
3. Depth (ft): 4
4. Biofilter width (ft) - for Cost Purposes Only: 10
5. Infiltration rate (in/hr) = 8
6. Random infiltration rate generation? No
7. Infiltration rate fraction (side): 1
8. Infiltration rate fraction (bottom): 1
9. Depth of biofilter that is rock filled (ft) 0
10. Porosity of rock filled volume = 0
11. Engineered soil infiltration rate: 13
12. Engineered soil depth (ft) = 2
13. Engineered soil porosity = 0.43
14. Percent solids reduction due to flow through engineered soil = 80
15. Biofilter peak to average flow ratio = 3.8
16. Number of biofiltration control devices = 1
17. Particle size distribution file: Not needed - calculated by program
18. Initial water surface elevation (ft): 0
Soil Data Soil Type Fraction in Eng. Soil
User-Defined Soil Type 1.000
Saturation water content percent (Porosity) = 0
Field capacity (%) = 0
Permanent Wilting Point (%) = 0
Infiltration rate (in/hr) = 13
Biofilter Outlet/Discharge Characteristics:
Outlet type: Sharp Crested Weir
1. Weir length (ft): 10
2. Invert elevation above datum (ft): 3.5
Outlet type: Broad Crested Weir
1. Weir crest length (ft): 5
2. Weir crest width (ft): 4
3. Height of datum to bottom of weir opening: 3
Control Practice 4: Biofilter CP# 4 (DS) - DS Biofilters # 4
1. Top area (square feet) = 5000
2. Bottom aea (square feet) = 800
3. Depth (ft): 4
4. Biofilter width (ft) - for Cost Purposes Only: 10
5. Infiltration rate (in/hr) = 8
6. Random infiltration rate generation? No
7. Infiltration rate fraction (side): 1
8. Infiltration rate fraction (bottom): 1
9. Depth of biofilter that is rock filled (ft) 0
10. Porosity of rock filled volume = 0
11. Engineered soil infiltration rate: 13
12. Engineered soil depth (ft) = 2
13. Engineered soil porosity = 0.43
14. Percent solids reduction due to flow through engineered soil = 80
15. Biofilter peak to average flow ratio = 3.8
16. Number of biofiltration control devices = 1
17. Particle size distribution file: Not needed - calculated by program
18. Initial water surface elevation (ft): 0
Soil Data Soil Type Fraction in Eng. Soil
User-Defined Soil Type 1.000
Saturation water content percent (Porosity) = 0
Field capacity (%) = 0
Permanent Wilting Point (%) = 0
Infiltration rate (in/hr) = 13
Biofilter Outlet/Discharge Characteristics:
Outlet type: Broad Crested Weir
1. Weir crest length (ft): 10
2. Weir crest width (ft): 4
3. Height of datum to bottom of weir opening: 3.5
Control Practice 5: Biofilter CP# 5 (DS) - DS Biofilters # 5
1. Top area (square feet) = 2000
2. Bottom aea (square feet) = 1140
3. Depth (ft): 7
4. Biofilter width (ft) - for Cost Purposes Only: 10
5. Infiltration rate (in/hr) = 8
6. Random infiltration rate generation? No
7. Infiltration rate fraction (side): 1
8. Infiltration rate fraction (bottom): 1
9. Depth of biofilter that is rock filled (ft) 0
10. Porosity of rock filled volume = 0
11. Engineered soil infiltration rate: 13
12. Engineered soil depth (ft) = 2
13. Engineered soil porosity = 0.43
14. Percent solids reduction due to flow through engineered soil = 80
15. Biofilter peak to average flow ratio = 3.8
16. Number of biofiltration control devices = 1
17. Particle size distribution file: Not needed - calculated by program
18. Initial water surface elevation (ft): 0
Soil Data Soil Type Fraction in Eng. Soil
User-Defined Soil Type 1.000
Saturation water content percent (Porosity) = 0
Field capacity (%) = 0
Permanent Wilting Point (%) = 0
Infiltration rate (in/hr) = 13
Biofilter Outlet/Discharge Characteristics:
Outlet type: Broad Crested Weir
1. Weir crest length (ft): 10
2. Weir crest width (ft): 4
3. Height of datum to bottom of weir opening: 4.75
SLAMM for Windows Version 10.4.1
(c) Copyright Robert Pitt and John Voorhees 2019, All Rights Reserved
Data file name: C:\Users\mamundson\OneDrive - MSA Professional Services, Inc\Desktop\Offline
Projects\Eagle River UHaul Review\UhaulWaterQuality.mdb
Data file description:
Rain file name: C:\WinSLAMM Files\Rain Files\WI_Multi_rain\GreenBay\WisReg - Green Bay WI
Annual 1969.ran
Particulate Solids Concentration file name: C:\WinSLAMM Files\v10.1 WI_AVG01.pscx
Runoff Coefficient file name: C:\WinSLAMM Files\WI_SL06 Dec06.rsvx
Pollutant Relative Concentration file name: C:\WinSLAMM Files\WI_GEO03.ppdx
Residential Street Delivery file name: C:\WinSLAMM Files\WI_Res and Other Urban Dec06.std
Institutional Street Delivery file name: C:\WinSLAMM Files\WI_Com Inst Indust Dec06.std
Commercial Street Delivery file name: C:\WinSLAMM Files\WI_Com Inst Indust Dec06.std
Industrial Street Delivery file name: C:\WinSLAMM Files\WI_Com Inst Indust Dec06.std
Other Urban Street Delivery file name: C:\WinSLAMM Files\WI_Res and Other Urban Dec06.std
Freeway Street Delivery file name: C:\WinSLAMM Files\Freeway Dec06.std
Apply Street Delivery Files to Adjust the After Event Load Street Dirt Mass Balance: False
Source Area PSD and Peak to Average Flow Ratio File: C:\WinSLAMM Files\NURP Source Area PSD
Files.csv
Cost Data file name:
If Other Device Pollutant Load Reduction Values = 1, Off-site Pollutant Loads are Removed
from Pollutant Load % Reduction calculations
Seed for random number generator: -42
Start of Winter Season: 12/02 End of Winter Season: 03/12
Model Run Start Date: 01/02/69 Model Run End Date: 12/28/69
Date of run: 06-17-2026 Time of run: 16:34:30
Total Area Modeled (acres): 2.710
Years in Model Run: 0.99
Runoff Percent Particulate
Particulate Percent
Volume Runoff Solids
Solids Particulate
(cu ft) Volume Conc.
Yield Solids
Reduction (mg/L)
(lbs) Reduction
Total of all Land Uses without Controls: 146332 - 65.79
601.0 -
Outfall Total with Controls: 11421 92.20% 58.90
42.00 93.01%
Annualized Total After Outfall Controls: 11579
42.58
WisDOT has a standard bid item for haul road maintenance which includes travel on public
roadways. That is similar to what would be required below. In that bid item, the contractor
is responsible for any damage to area roadways that are affected by the Work.
For your project, the municipality has every right to restrict loads on their roadways. The
roadway should be posted to officially limit traffic. It could be posted as a Class B highway
or other restrictions for reduced axle loads. An ordinance is required along with signs
posted in order for the weight limits to be enforced by local law enforcement.
A few MSA Experiences from over the years
1. In a municipal client community 8 years ago, a contractor working for the local
school district hauled many hundreds of fully loaded vehicles on a roadway with
very little pavement and base. The roadway was damaged in many areas including
huge ruts and base course pumping through the asphalt. So yes, this happens. The
City claimed the roadway was not a truck route and not designed to handle heavy
loads. The contractor agreed to contribute many thousands of dollars to the City to
repave the roadway. This was after the fact though.
2. On another project 6 years ago where a PW/City contractor was hauling excavated
material to a remote waste site off a town road. We monitored the roadway (took
photos and videos, preconstruction) and wrote some special procedures about
existing roadway maintenance. The contractor did a good job of hauling only at
certain times (this was a winter project, so hauling at night or early morning when
frozen). There was limited damage to the roadway during construction and the
contractor did agreement to repair minor sections of the town road.
After the experiences noted above, it can be worth adding a bid item to certain projects
where the local roads are needed for hauling material and equipment. This would be one
method to basically require the contractor to review roadways and repair damaged
pavement. Documentation of existing road conditions prior to hauling on the road(s) would
be a crucial aspect of the method.
1
TEMPLATE
TOWN ROAD UPGRADE AND MAINTENANCE AGREEMENT
This TOWN ROAD UPGRADE AND MAINTENANCE AGREEMENT (this
“Agreement”) is made and entered into this ___ day of __________, 20___ by and between the
Town of Holland (the “ Town”), and __________________________________________ (the
“Operator”).
RECITALS
WHEREAS, [insert appropriate language describing the operation such as mining, manure
hauling, timber sales, etc.] [In the case of a mining operation: Operator is in the business of
mining and production of silica sand, and is in the process of constructing, developing,
operating, maintaining and reclaiming a non -metallic mining facility (the “Project”) in the
Town of Holland , Wisconsin, and has submitted an application for a Non -metallic Mining
Reclamation Permit for the Project with the County of La Crosse in accordance with the Non -
metallic Mining Reclamation Ordinance of La Crosse County, and ]
WHEREAS, in connection with the construction, development, oper ation, maintenance
and reclamation of the Project, the Parties desire to address certain issues relating to the roads
owned, operated and maintained by the Town (collectively, the “ Town Roads”) over which it
will be necessary for Operator and Operator’s R epresentatives to, among other things, transport
heavy equipment and certain locally sourced materials, [including, but not limited to, silica
sand,] over certain Town Roads, which may in certain cases be in excess of the design limits of
the Town Roads; and both parties acknowledge that certain of the Town Roads may not be
constructed to withstand the frequency and weight of shipments necessary for the Operator to
transport its products and equipment.
WHEREAS, Wis. Stat. §349.16(1)(c) authorizes the Town Board to enter into an
agreement with any owner or operator of any vehicle being operated on a highway maintained by
the Town that provides that the Town will be reimbursed for any damage done to the highway,
and
WHEREAS, Operator has provided to Town a site layout plan for the Project that shows
the access road entrances, a copy of which is attached as Exhibit A (the “Plan”), and
WHEREAS, Operator and Town wish to set forth their understanding and agreement as to
the road issues r elating to the construction, development, operation, maintenance and
reclamation of the Project, and
WHEREAS, this Agreement shall apply to those Town Roads listed on the attached
Exhibit B and, subject to Section 4 .B. herein, any other Town Ro ad(s) used by Operator or
Operator’s Representatives in direct support of the construc tion, development, operation,
maintenance and reclamation of the Project.
2
AGREEMENT
NOW, THEREFORE, in consideration of the mutual promises and covenants h erein set
forth, the parties, intending to be legally bound, agree as follows:
Section 1. Term of Agreement.
This Agreement shall commence upon the date indicated above (the
“Effective Date”) and shall continue in full force and effect until
[Operator’s Non-metallic Mining Reclamation ] Permit has expired, has
been terminated, or until Operator has fully discontinued its construction,
development, operation, maintenance and reclamation of the Project and
any and all transportation activities related ther eto on the Town Roads
listed on Exhibit B, whichever occurs later.
The Operator shall notify the Town in writing of the designated haul route
at least three weeks before hauling materials over a Town road. The Town
or its representative will subsequently survey the existing condition of that
haul route to establish a baseline for assessing damage that the Operator’s
hauling operation might cause. The process of surveying the route will
incorporate but is not limited to, previous PASER rating logs, video
recording, soil borings and structure evaluations.
Section 2. Operator, in respect to the Project constructed, developed, operated,
maintained and reclaimed by it, acknowledges and agrees the Project may
require Town to undertake the following activities in order to preserve
Town Roads and that the Operator shall be financially responsible for the
costs of said activities to the extent provided for under the terms of this
Agreement:
A. The cost of upgrading pavement sections on Town Roads to withstand the
hauling of products and equipment that are necessary for the Project shall
be done to standards in accordance with the appropriate/applicable
sections of the WIDOT, Facilities De velopment Manual, and in
accordance with Chapter 82 of the State Stats and T RANS 204 of the
Administrative Code.
B. The cost of u pgrading the geometric design of the Town Roads that will
safely and efficiently accommo date the traffic that Operator has indicated
the Project will generate; including improvements at entrances,
intersections and to the typical cross-section, shall be done to a standard as
directed by the WIDOT, Facilities Development Manual and in
accordance with Chapter 82 of the State Stats and TRANS 204 of the
Administrative Code . Geometric improvements shal l also include any
improvements to Structures and Culverts necessary to accommodate the
increased traffic from the Project.
3
Structures already programmed for replacement or reconstruction in the
Wisconsin Department of Transportation Bridge Program will not be
subject to cost share. During the replacement of a W IDOT programmed
structure, the Town will work with the Operator to ensure that the
structure is replaced as quickly as possible so as not to inconvenience the
operator, however, there may be peri ods of time that an alternate route
shall be designated and that route may be subject to load posting or
hauling permits.
C. The cost for p roviding Engineering P lans for all improvements needed
under Sections 2.A. and 2.B. above, including any Right-of-Way needed.
D. Operator shall be responsible for all exceptional maintenance costs, above
normal maintenance requirements, that are attributable to damage to Town
Roads from the hauling of products and equipment related to the Project.
Said maintenance cost may occur either before or after any of the
improvements to Town Roads indicated in Sections 2.A., 2.B. and 2.C.
above are made. Town shall inform Operator if it has a good faith basis to
believe any exceptional mainten ance costs become necessary and provide
a good faith estimate of costs to Operator prior to commencing work.
Town will invoice the Operator for exceptional maintenance costs
incurred as the work is completed. Operator shall have thirty (30) days
from the date of invoicing to make payment to Town.
E. In order to compensate Town for repairs needed as a result of Operator’s
use and to accomplish the work indicated in Sections 2.A., 2.B. and 2.C.
above, Operator shall make a payment to Town of
__________________________________Dollars ($__________) at the
time of execution of this Agreement. Based on the construction plans
provided by the Operator and cost estimate agreed upon by both parties,
the paym ent amount should be sufficient for Town to make nee ded
improvements to the Haul Route.
Notwithstanding the above , Operator acknowledges that conditions may
be encountered or additional requirements imposed by the WIDOT or
other regulatory agency that require additional work by the Town and that
the cost of all additional work is the responsibility of the Operator. When
improvements are complete the Town will invoice the Operator for any
additional costs incurred. Operator shall have thirty (30) days from the
date of invoicing to make payment to Town.
After construction of the improvements is complete any remaining funds
will be returned to Operator within thirty (30) days of project audit by
Town.
4
F. At the discretion of the Town, a bond may be required to insure against
costs associated with excessive wear and tear on Town Roads.
Section 3. Town, in accordance with the terms of this Agreement, agrees to:
A. Review for approval all access points to the Town Road system by giving
consideration to sight distances, drainage and proximity to other entrances,
in a reasonable manner, and in accordance with accepted engineering
practices;
B. Review for approval permits for all utility encroachments on Town rights-
of-way in a reasonable manner, and in accordance with accepted
engineering practices;
C. Coordinate with Operator and Operator’s Representatives so as to
minimize the impact of their use of the Town Road system;
D. Perform all maintenance and construction of all improvements pursuant to
this Agreement on the Town Roads used for the construction,
development, operation, maintenance and reclamation of the Project.
E. Keep those Town Roads listed on the attached Exhibit B of this
Agreement open to Operator to haul products and equipment related to the
Project for the enti re term of this Agreement without further restrictions,
other than those indicated in this Agreement, for all vehicles meeting
statutory requirements for weight, width, height and length. Town shall
retain the right and its authority to establish and set traffic speed limits in
accordance with generally accepted highway standards and safety
practices.
Section 4. Road Inventory.
A. Routing and Access Approval.
This Agreement applies only to the Town Roads listed on the attached
Exhibit B of this Agreement. If conditions or circumstances change and
Operator desires to change haul routes, it must first request authorization
from the Town. All expenses for additional haul routes are not part of this
Agreement and shall be negotiated by the Operator and Town in a separate
agreement in the event any changes are requested.
B. Incidental Use
The Parties recognize that the Project traffic may, either through mistake
or with the consent of Town, use Town Roads other than those listed on
Exhibit B of this Agreement. Repairs for damage caused by Operator or
Operator’s Representatives during such mistaken or permitted use shall be
treated as exceptional maintenance under Section 2.D. above.
5
Section 5. Construction Cooperation.
A. Operator.
Operator shall submit to Town a schedule with planned activities that
affect the Town Roads. Said Schedule shall reasonably indicate the
estimated number of trucks that will be hauling products and equipment
and daily hours of operation. Operator shall submit the Schedule to Town
within two (2) weeks of execution of this A greement. Operator shall
further provide Town with an updated S chedule within two (2) weeks of
any material changes being made with the Project. Operator understands
that Town Road construction and maintenance activities will be on -going
while Project hauling is occurring , and that while Town Roads will be
open to traffic , Operator acknowledges that these activities may slow
hauling operations.
B. Town:
During the term of this Agreement, Town and Operator shall meet as
needed to discuss Project activities and Town Road construction and
maintenance schedules. Town agrees to keep those Town Roads specified
in Exhibit B open to Project traffic during Town Road construction and
maintenance activities, except that Town may temporarily close any of the
Town Roads specified in Exhibit B for replacement of a culvert, structure
or due to an emergency. Town will provide a temporary alternate haul
route when reasonably practicable. Annu al seasonal weight limitations
shall apply to all haul routes in Exhibit B and to any alternate routes
approved by Town.
Town agrees to exclusively use any payments received from Operator as
part of 2(E) of this Agreement on Town Roads used as haul rout es by the
Operator.
C. Emergency Actions.
Notwithstanding the foregoing, in the event Operator or Operator’s
Representatives have caused damage to Town Roads of a magnitude
sufficiently great to create a hazard to the motoring public, which in
Town’s opinion warrants an immediate repair or Town Road closing,
Town may unilaterally close those Town Road(s) affected and make or
authorize repair, with the reasonable, documented costs thereof paid for by
Operator.
Both Parties acknowledge that while Town is the Jurisdictional Authority
for those Town Roads listed in Exhibit B, certain emergency situation s
may arise that fall under law enforcement, fire district or emergency
6
management control. In such situations the road may be closed to traffic,
including traffic from the Project, outside the control of Town. Town
shall not be responsible for any harm to Operator , Operator’s
Representatives or the Project that may result from Town Road closings
that occur due to such emergencies.
Section 6. Indemnification/Hold Harmless and Liability Insurance Provisions.
A. Indemnification by Operator . Operator hereby releases and agrees to
indemnify and hold harmless Town and its respective officers, employees,
elected or appointed officials, and agents , and their respective heirs,
executors, administrators, successors and assigns (hereinafter collectively
“Town Releasees”) from any and all third party actions, causes of action,
suits, claims, expenses (including reasonable attorney’s fees) and demands
against Town Releasees arising out of or relating to the performance by
Operator of its obligations under this Agreement. More particularly, but
without in any way limiting the foregoing, Operator hereby releases Town
Releasees and agrees to indemnify and hold harmless Town Releasees from
any and all third party actions, causes of action, suits, claims, expenses
(including reasonable attorney’s fees) and demands arising directly or
indirectly from any personal injury, death or property damage arising out of
the use by Operator or Operator’s Representatives of any Town Road
subject to this Agreement.
1. Limitations of Liability . In no event shall Town or any of their
Board, officers, elected or appointed officials, agents, investors,
principals, share holders, members or employees be liable (in
contract or in tort, involving negligence, strict liability, or otherwise)
to the Operator or its contractors, suppliers, employees, members
and shareholders for indirect, incidental, consequential or punitive
damages resulting from the performance, non -performance or delay
in performance under this Agreement.
2. Required Insurance. Operator shall at all times throughout the term
of this Agreement maintain in full force and effect commercial
general liability insurance, naming Town, its Board, officers, elected
or appointed officials, agents and employees as an additional
insured, in the aggregate amount equal to
____________________________________ dollars ($ ________)
of primary and/or excess insurance to satisfy this requirement.
Or
Required Escrow. Operator shall at all times throughout the term of
this Agreement establish and ma intain in full force and effect an
escrow account in the amount of _____________ dollars ($
________) to cover performance of this Agreement.
Section 7. Remedies and Enforcement.
7
Each of the Parties hereto covenant and agree that in the event of default
of any of the terms, provisions or conditions of this Agreement by any
party (the “Defaulting Party”), which def ault is not caused by the party
seeking to enforce said provisions (the “Non -Defaulting Party”) and after
notice and reasonable opportunity to cure has been provided to the
Defaulting Party, then in such an event, the Non -Defaulting Party shall
have the ri ght of specific performance. The remedy of specific
performance and injunctive relief shall not be exclusive of any other
remedy available at law or in equity.
Section 8. Savings/Severability.
It is mutually agreed by the Parties that in the event any provision of this
Agreement is determined by any court of law of competent jurisdiction to
be unconstitutional, invalid, illegal or unenforceable in any respect, it is
the intention of the parties that such unconstitutionality, invalidity,
illegality or unenforceability shall not affect the other provisions, and the
Agreement shall be construed as if such unconstitutional, invalid, illegal or
unenforceable provision had never been contained in this Agreement.
Section 9. Entire Agreement.
This Agreement and the exhibits attached thereto constitute the entire
agreement among the Parties hereto with respect to the subject matter
hereof, and supersede any prior understandings or written or oral
agreements between the parties with respect to the subject matter of this
Agreement. No amendment, modification, cancellation or alteration of the
terms of this Agreement shall be binding on any party hereto unless the
same is in writing, dated subsequent to the date hereof and is duly
authorized and executed by the Parties hereto.
Section 10. Designated Representative.
FOR TOWN:
David Carlson, Chair
Town of Holland
W7937 County Road MH
Holmen, WI 54636
FOR OPERATOR:
____________________
____________________
____________________
____________________
Section 11. Notices.
8
All notices to be given under the terms of this Agreement shall be in
writing and signed by the person serving the notice and shall be sent via
registered or certified mail, return receipt requested, postage prepaid, or
hand delivered to the addresses of the parties listed below. Notice shall be
deemed to have been received on the date of receipt as shown on the
return receipt or other written evidence of receipt.
Section 12. Assignability/Consent.
This Agreemen t shall be binding on the Parties hereto, their respective
heirs, devisees and successors. Except as otherwise provided herein, or
except as may be hereafter determined by the Parties, Operator may not
sell, assign or transfer its interest in this Agreeme nt, or any of its rights,
duties or obligations hereunder, without the prior written consent of Town.
Whenever the consent or the approval of Town is required herein, Town
shall not unreasonably withhold, delay or deny such consent or approval.
Section 13 . Choice of Law and Forum Selection.
This Agreement shall be governed by, and construed, interpreted and
enforced in accordance with the laws of the State of Wisconsin. The
Parties agree, for any claim or suit or other dispute relating to this
Agreement that cannot be mutually resolved, the venue shall be in the
Circuit Court of La Crosse County, and the parties further agree to submit
themselves to the jurisdiction of said court, to the exclusion of any other
judicial district that may have jurisdiction over such a dispute according to
any law.
Section 14. Waiver of Terms and Conditions.
The failure of a Party to enforce or insist upon compliance with any of the
terms or conditions of this Agreement shall not constitute a general waiver
or relinquishment of any such terms or conditions, but the same shall be
and remain at all times in full force and effect.
Section 15. Cooperation.
The Parties agree to cooperate with each other in addressing any
unforeseen or extraordinary events caused by Operator’s activity that
would result in significant impacts to the Town Roads. The parties further
agree to cooperate with each other in addressing any unforeseen impact to
Operator’s ability to utilize the haul route or any alternative route provided
for in this Agreement.
9
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the
day and year first written above.
OPERATOR:
________________________.
By: _______________________
Its _______________________
TOWN:
_________________________________
By: David Carlson
Chairman, Town of Holland
EXHIBIT A
The Plan
EXHIBIT B
Haul Routes
DATE: 6/18/2026 2026
2026
GENERAL
1 Mobilization, Bonds, & Insurance 1 L.S. 40,000.00$ 40,000$
2 Erosion and Sedimentation Control 1 L.S. 5,000.00$ 5,000$
3 Traffic Control 1 L.S. 5,000.00$ 5,000$
4 Turf Restoration 1 L.S. 10,000.00$ 10,000$
5 Adjust Manhole Casting 2 EA. 2,000.00$ 4,000$
6 Adjust Water Valve Box 2 EA. 500.00$ 1,000$
ROADWAY - North Bluebird Rd.
7 Unclassified Excavation (Includes Removals) 1 L.S. 15,000$ 15,000$
8 Furnish and install 10 Inch Thick Aggregate Base Course, 1 1/4 -inch 2,400 S.Y. 28$ 67,200$
9 Excavation Below Subgrade 30 C.Y. 25$ 750$
10 Furnish & Install Granular Borrow 30 C.Y. 25$ 750$
11 Gravel Shoulder, 3-Inch Thick 200 S.Y. 25 $ 5,000$
12 Furnish & Install 3-Inch Thick Asphaltic Pavement 2,200 S.Y. 27 $ 59,400$
13 Sawcut Asphalt Pavement 200 L.F. 6 $ 1,200$
ROADWAY - Airport Rd.
14 Unclassified Excavation (Includes Removals) 1 L.S. 10,000$ 10,000$
15 Furnish and install 10 Inch Thick Aggregate Base Course, 1 1/4 -inch 1,200 S.Y. 28$ 33,600$
16 Excavation Below Subgrade 30 C.Y. 25$ 750$
17 Furnish & Install Granular Borrow 30 C.Y. 25$ 750$
18 Gravel Shoulder, 3-Inch Thick 100 S.Y. 25 $ 2,500$
19 Furnish & Install 3-Inch Thick Asphaltic Pavement 1,100 S.Y. 27 $ 29,700$
20 Sawcut Asphalt Pavement 200 L.F. 6 $ 1,200$
292,800$
15% 43,920 $
2026 ) 336,720 $
10% 33,700 $
10% 33,700 $
404,120$
Disclaimers & Assumptions
1
2
3
4
5
6 this estimate assumes that the existing pavement depth is equal to the proposed depth
This estimate of probable cost is approximate. Actual construction bids may vary significantly from this estimate due to timing of bids,constructual schedule restraints, labor rate increases, material increases, or other
factors beyond the control of the estimator.
2-12' Lanes with 2' shoulders N. Bluebird 800 Ft Long
2-12' Lanes 150 ft taper to 2-15' lanes 175ft with 2' shoulders airport road (325 Ft Long)
3in asphalt pavment
Contingency
ESTIMATED CONSTRUCTION COST(
Construction Engineering
TOTAL ESTIMATED PROJECT COST:
ESTIMATE OF PROBABLE COSTS
N BLUEBIRD ROAD & AIRPORT ROAD PAVEMENT REPLACEMENT
BASE REPLACMENT OPTION
CITY OF EAGLE RIVER
ITEM
NO. DESCRIPTION QUANTITY UNIT UNIT PRICE
10inch Thick base aggregate replacement
ESTIMATE YEAR:
TOTAL PRICE
Design Engineering
CONSTRUCTION YEAR:
ESTIMATED CONSTRUCTION SUBTOTAL
DATE: 6/18/2026 2026
2026
GENERAL
1 Mobilization, Bonds, & Insurance 1 L.S. 25,000.00$ 25,000$
2 Erosion and Sedimentation Control 1 L.S. 5,000.00$ 5,000$
3 Traffic Control 1 L.S. 5,000.00$ 5,000$
4 Turf Restoration 1 L.S. 10,000.00$ 10,000$
5 Adjust Manhole Casting 2 EA. 2,000.00$ 4,000$
6 Adjust Water Valve Box 2 EA. 500.00$ 1,000$
ROADWAY - North Bluebird Rd.
7 Pulverize Existing Pavement and Shape N. Bluebird Rd. South 750 FT from Airport Rd.2,200 S.Y. 5.00$ 11,000$
8 Unclassified Excavation (Includes Removals) 1 L.S. 5,000$ 5,000$
9 Gravel Shoulder, 3-Inch Thick 200 S.Y. 25 $ 5,000$
10 Furnish & Install 3-Inch Thick Asphaltic Pavement 2,200 S.Y. 27 $ 59,400$
11 Sawcut Asphalt Pavement 200 L.F. 6 $ 1,200$
ROADWAY - Airport Rd.
12 Pulverize Existing Pavement and Shape Airport Rd. West 325 FT from N. Railroad St.1,000 S.Y. 5.00$ 5,000$
13 Unclassified Excavation (Includes Removals) 1 L.S. 5,000$ 5,000$
14 Gravel Shoulder, 3-Inch Thick 100 S.Y. 25 $ 2,500$
15 Furnish & Install 3-Inch Thick Asphaltic Pavement 1,000 S.Y. 27 $ 27,000$
16 Sawcut Asphalt Pavement 200 L.F. 6 $ 1,200$
172,300$
15% 25,845 $
2026 ) 198,145 $
10% 19,900 $
10% 19,900 $
237,945$
Disclaimers & Assumptions
1
2
3
4
5
6 Assumes a pulverize and overly option
this estimate assumes that the existing pavement depth is equal to the proposed depth
Construction Engineering
TOTAL ESTIMATED PROJECT COST:
This estimate of probable cost is approximate. Actual construction bids may vary significantly from this estimate due to timing of bids,constructual schedule restraints, labor rate increases, material increases, or other
factors beyond the control of the estimator.
2-12' Lanes with 2' shoulders N. Bluebird 800 Ft Long
2-12' Lanes 150 ft taper to 2-15' lanes 175ft with 2' shoulders airport road (325 Ft Long)
3in asphalt pavment
Contingency
ESTIMATED CONSTRUCTION COST(
Design Engineering
CONSTRUCTION YEAR:
ESTIMATED CONSTRUCTION SUBTOTAL
ESTIMATE OF PROBABLE COSTS
N BLUEBIRD ROAD & AIRPORT ROAD PAVEMENT REPLACEMENT
PULVERISE AND OVERLAY OPTION
CITY OF EAGLE RIVER
ESTIMATE YEAR:
ITEM
NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE
STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: OTHERSDESIGNER: DUSTIN VREELANDFILE NO.: 26-0159 PROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION
SHEETSCALE:ORIGINAL PLAN DATE: 5/28/2026
TITLE PAGE:
PREPARED FOR:PLAN DATE:
C1NO SCALE
FNDIP-3/4"
FNDIP-3/4"
FNDIP-1"FNDIP-1"
FNDIP-3/4"
1645.4
1646.2OAK34
1645.0PIN81644.9PIN91645.0PIN81645.4PIN81645.4PIN81645.4PIN71645.3PIN7
1646.2PIN91646.0PIN71646.5PIN14
1645.31645.41645.21645.4
1645.4
1645.81646.41646.01645.5
1642.4
1644.00
RIM:1644.86INV:1635.36
118,014 S.F.(2.71 ACRES)
STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: OTHERSDESIGNER: DUSTIN VREELANDFILE NO.: 26-0159 PROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION
SHEETSCALE:ORIGINAL PLAN DATE: 5/28/2026
TITLE PAGE:
PREPARED FOR:PLAN DATE:
C21" = 30'
FNDIP-3/4"
FNDIP-3/4"
FNDIP-1"FNDIP-1"
1644.91644.6
FNDIP-3/4"
1645.4
1645.31645.41645.21645.4
1645.4
1645.81646.41646.01645.5
1643.91644.01643.01642.51642.41641.91642.2
1644.00
RIM:1644.86INV:1635.36
STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: OTHERSDESIGNER: DUSTIN VREELANDFILE NO.: 26-0159 PROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION
SHEETSCALE:ORIGINAL PLAN DATE: 5/28/2026
TITLE PAGE:
PREPARED FOR:PLAN DATE:
C31" = 30'
FNDIP-3/4"
FNDIP-3/4"
FNDIP-1"FNDIP-1"
1644.91644.6
FNDIP-3/4"
1645.4
1645.31645.41645.21645.4
1645.4
1645.81646.41646.01645.5
1643.91644.01643.01642.51642.41641.91642.2
1644.00
RIM:1644.86INV:1635.36
STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: OTHERSDESIGNER: DUSTIN VREELANDFILE NO.: 26-0159 PROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION
SHEETSCALE:ORIGINAL PLAN DATE: 5/28/2026
TITLE PAGE:
PREPARED FOR:PLAN DATE:
C41" = 30'
FNDIP-3/4"
FNDIP-3/4"
FNDIP-1"FNDIP-1"
1644.91644.6
FNDIP-3/4"
1645.4
1645.31645.41645.21645.4
1645.4
1645.81646.41646.01645.5
1643.91644.01643.01642.51642.41641.91642.2
1644.00
RIM:1644.86INV:1635.36
STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: OTHERSDESIGNER: DUSTIN VREELANDFILE NO.: 26-0159 PROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION
SHEETSCALE:ORIGINAL PLAN DATE: 5/28/2026
TITLE PAGE:
PREPARED FOR:PLAN DATE:
C51" = 30'
EROSION CONTROL SCHEDULING1.INSTALL PERIMETER EROSION CONTROL. INSTALL INLET PROTECTION ON ALL CATCH BASIN DOWNSTREAM OF SITE EVEN IFNOT CALLED OUT ON THIS SHEET.2.BEGIN DEMOLITION FOR NEW BUILDING.3.BEGIN ROUGH GRADING AND UTILITY INSTALLATION.4.DURING GRADING ACTIVITIES EXISTING GRASS AND VEGETATION, TO BE REMOVED, SHALL REMAIN IN PLACE FOR AS LONG ASPOSSIBLE, TO AVOID SEDIMENT TRANSPORT.5.ALL DISTURBED AREAS SHALL BE STABILIZED, TEMPORARILY AND/OR PERMANENT, WITHIN 30 DAYS OF DISTURBANCE, ORPERMANENTLY STABILIZED WITHIN 7 DAYS OF ACHIEVING FINISHED GRADE.6.IF DISTURBED AREAS MUST BE LEFT OVER WINTER, AN ANIONIC POLYACRYLAMIDE SHALL BE APPLIED TO ALL DISTURBEDAREAS PRIOR TO GROUND FREEZE. SEE SPECIFICATIONS FOR DETAILS.
PROPOSED EROSION CONTROL ACTIVITIES
STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: OTHERSDESIGNER: DUSTIN VREELANDFILE NO.: 26-0159 PROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION
SHEETSCALE:ORIGINAL PLAN DATE: 5/28/2026
TITLE PAGE:
PREPARED FOR:PLAN DATE:
C61" = 30'
FNDIP-3/4"
FNDIP-3/4"
FNDIP-1"FNDIP-1"
1644.91644.6
FNDIP-3/4"
1645.4
1645.31645.41645.21645.4
1645.4
1645.81646.41646.01645.5
1643.91644.01643.01642.51642.41641.91642.2
1644.00
RIM:1644.86INV:1635.36
STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: OTHERSDESIGNER: DUSTIN VREELANDFILE NO.: 26-0159 PROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION
SHEETSCALE:ORIGINAL PLAN DATE: 5/28/2026
TITLE PAGE:
PREPARED FOR:PLAN DATE:
C71" = 30'
FNDIP-3/4"
FNDIP-3/4"
FNDIP-1"FNDIP-1"
1644.91644.6
FNDIP-3/4"
1645.4
1645.31645.41645.21645.4
1645.4
1645.81646.41646.01645.5
1643.91644.01643.01642.51642.41641.91642.2
1644.00
RIM:1644.86INV:1635.36
STAMP/SIGNATURE:SCALE NOTE:SURVEYED BY: OTHERSDESIGNER: DUSTIN VREELANDFILE NO.: 26-0159 PROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION
SHEETSCALE:ORIGINAL PLAN DATE: 5/28/2026
TITLE PAGE:
PREPARED FOR:PLAN DATE:
C81" = 30'
Storm Water Management
1
Vreeland
Land Surveyors & Engineers
Project #
2
6
-
0159
Erosion Control/Storm Water Management
Maintenance/Operation Plan
For:
U
-
Haul Eagle River
Prepared By:
6103 Dawn Street
Weston, WI 54476
Located in:
City of Eagle River
Vilas
County, WI
Dated:
June 30
, 2026
Storm Water Management
2
Vreeland
Land Surveyors & Engineers
Project #
2
6
-
0159
TABLE OF CONTENTS
Storm Water Management Plan
U
-
Haul Eagle River
City of Eagle River
, Wisconsin
1.0
BACKGROUND & GENERAL INFORMATION
................................
................
3
1.1
Introduction and Project Location
................................
..............................
3
1.2
Project Description
................................
................................
......................
3
1.3
Project Requirements
................................
................................
..................
3
1.4
General Project Data
................................
................................
...................
3
2.0
EXISTING DRAINAGE CONDITIONS
................................
...............................
4
2.1
Existing Drainage Area
................................
................................
...............
4
2.2
Existing Drainage Calculation Summary
................................
....................
4
2.3
Existing Off
-
Site Drainage
................................
................................
.........
4
3.0
PROPOSED DRAINAGE CONDITIONS
................................
.............................
4
3.1
Proposed Drainage Areas
................................
................................
............
4
3.2
Post
-
Development Runoff Summary
................................
..........................
4
3.3
Proposed Detention Areas
................................
................................
...........
4
4.0
POST
-
DEVELOPMENT PERFORMANCE STANDARDS
................................
5
4.1
Total Suspended Solids
................................
................................
...............
5
4.2
Infiltration
................................
................................
................................
...
5
4.3
Peak Discharge
................................
................................
............................
5
4.4
Protective Area
................................
................................
............................
5
4.5
Summary
................................
................................
................................
.....
6
5.0
CONSTRUCTION SITE PERFORMANCE STANDARDS
................................
.
6
5.1
Erosion Control
................................
................................
...........................
6
5.2
Construction Site Erosion Control Measures
................................
..............
6
5.3
Operation and Maintenance, Short
-
term
................................
.....................
7
5.4
Operation and Maintenance, Long
-
term
................................
.....................
7
6.0
SOIL AND SEDIMENT LOSS DISCHARGE
................................
......................
8
Appendices
A.
Location Map
B.
Geotechnical Data
C
.
Existing Drainage Map and Calculations
D
.
Proposed Drainage Map and Calculations
E.
Soil Loss and Sediment Discharge Map and Calculations
F.
State of Wisconsin Construction Site Inspection Report
and Plan of Operation
Storm Water Management
3
Vreeland
Land Surveyors & Engineers
Project #
2
6
-
0159
Erosion Control/Storm Water Management
Maintenance and Operation Plan
for
U
-
Haul Eagle River
1.0
BACKGROUND & GENERAL INFORMATION
1.1
Introduction
and Project Location
Vreeland Associates
has been retained by
David Barnes
to perform storm water management
calculations and prepare a storm water management plan per NR216.47 and
NR151, for
the
propose
d
shed buildings
project
.
The project site is
located
at
1100 N Railroad Street Eagle River,
WI
. The project is
located
in
part of the
Northwest ¼ of the Northwest ¼
of
Section
2
8
, Township
40
North, Range
1
0
East,
City of Eagle River
,
Vilas
County, Wisconsin.
1.2
Project Description
The proposed project cons
ists of
developing
proposed
2.
7
acres for
indoor
storage
and
parking lot
.
T
he site will be graded for storm water management best management practices.
(
S
ee L
ocation
Plan in
Appendix A
).
1.3
Project
Requirements
The project area includes
approximately
2.
7
acres that will be disturbed.
Since the disturbed
area
exceeds
one acre, a Wisconsin Department of Natural Resources Notice of Intent
application/permit (NOI
-
WPDES per WDNR) is
required.
The storm water management plan for this project is developed in accordance with the NOI
-
WPDES requireme
nts and NR216.47/NR151.12
1
for
new
development
site
.
1.4
General Project Data
Soils
B
ase
d on existing soil mapping data
from the
Natural Resources Conservation Service
(NRCS)
, the
existing subgrade soils are expected to be
Rubicon sand
, which are
c
lassified as hydrologic class
“
A
”
.
Stormwater test pits were performed by
Partners
.
The
borings
found to topsoil overlaying
fill
sand
and sand
.
These
borings
are consistent with NRCS. The
determined limiting factor for
stormwater infiltration was
sand
layer
with an infiltration rate of
3.6
in/hr.
T
he geotechnical data
containing soil hydrologic classes
are
attached in
Appendix B
.
Groundwater
At the site of the proposed
infiltration
groundwater was
encountered.
Groundwater will be well
below the proposed project and will not be disturbed.
Wetlands
According to the Wisconsin DNR Wetlands and Wetlands Indicator map, there are
not
identified
wetlands within the project limit
s
.
Storm Water Management
4
Vreeland
Land Surveyors & Engineers
Project #
2
6
-
0159
2.0
EXISTING DRAINAGE CONDITIONS
2.1
Existing Drainage Area
The
existing
site consists
of
one
sub
-
basin
(
E1
).
Sub
-
basin
E1
contains
grass
.
E1
generally
flows
to the
northeast
of the property
.
An existing drainage map can be found in
Appendix C.
2.2
Existing Drainage Calculation Summary
Existing drainage calculations utilize TR
-
55 methodology and results for a
1,
2, 10
and 100
-
year
design storm are included. Existing drainage calculations are provided in
Appendix C.
2.3
Existing Off
-
Site Drainage
Existing off
-
site storm water
runoff draining onto the project site has
been taken into consideration
for
the existing or proposed drainage
evaluation
.
3.0
PROPOSED DRAINAGE CONDITIONS
3.1
Proposed Drainage Areas
The proposed site is divided into
six
sub
-
basins
(
D1
-
D5, 1S
)
.
1S
consists of runoff from the
grass
area.
Runoff from D1 consists of parking lot, building, and grass.
Runoff from
D1
is
conveyed
to
the
north
and will runoff
into P1 for treatment and rate control
.
D2
consists of the
parking lot,
building
and
grass area.
Runoff from
D2
is conveyed
to the
west
into
P2 for treatment and rate
control
.
D3
consists of runoff from the proposed
building
s
, parking lot and
lawn area. Runoff from
D3
is conveyed
into the proposed stormwater detention basin
3P
for treatment and rate control.
D4
consists of runoff from the proposed
buildings, parking lot and
lawn area. Runoff from
D4
is
conveyed
into the proposed stormwater detention basin 3P
for treatment and rate control
. D5
consists of runoff from the proposed
buildings, parking lot and
lawn area. Runoff from
D5
is
conveyed
into the proposed stormwater detention basin 3P
for treatment and rate control
.
A
pro
posed drainage area map is provided in
Appendix
C
.
3.2
Post
-
Development Runoff Summary
Proposed drainage calculations utilize TR
-
55 methodology and results for a
1,
2,
10
and 100
-
year
design storm have been attached. A proposed drainage area map and calculations are provided in
Appendix D.
3
.3
Proposed Detention Areas
There
are
five
proposed
treatment and rate control devices
for
storm
water management
.
Pond
P1
is a
stormwater
infiltration
basin that
will be used for infiltration p
ur
poses, total suspended solids
removal and peak discharge control
.
Infiltration basin
(1P) is
located on the
northeast corner
of
the
proposed project
.
The basin
will have
a culvert to flow into P2
to control the depth of water.
An
emergency overflow has been included for extreme storm events.
Pond
P2
is a
stormwater
infiltration basin that will be used for infiltration purposes, total suspended solids removal and
peak discharge control
.
Infiltration basin (P2) is located on the northwest side of the proposed
project. The basin will have a culvert to flow into P3
to control the depth of water. An emergency
overflow has been included for extreme storm events.
Pond
P3
is a
stormwater infiltration basin
that will be used for infiltration purposes, total suspended solids removal and peak discharge
control
.
Infiltration basin (P3) is located on the west side of the proposed project. The basin will
have a
broa
dcreste
d weir
into P4 to control the depth of water. An emergency overflow has been
included for extreme storm events.
Pond
P4
is a
stormwater infiltration basin that will be used for
infiltration purposes, total suspended solids removal and peak discharge control
.
Infiltration basin
(
4
P) is located on the west side of the proposed project.
The basin will have a culvert to flow into
P
5
to control the depth of water
.
An emergency overflow has been included for extreme storm
Storm Water Management
5
Vreeland
Land Surveyors & Engineers
Project #
2
6
-
0159
events.
Pond
P5
is a
stormwater infiltration basin that will be used for infiltration purposes, total
suspended solids removal and peak discharge control
.
Infiltration basin (P5) is located on the
south side
of the proposed project. An emergency overflow has been included for extreme storm
events.
See
Appendix
C
detention basin volume calculations.
4.0
POST
-
DEVELOPMENT PERFORMANCE STANDARDS
4.1
Total Suspended Solids
1.
According to NR151.122, BMPs shall be designed in accordance with Table 1, or to the
maximum extent practicable.
For
new
development projects Table 1 indicates that the
total suspended solids load from parking areas
and roads shall be reduced by
8
0
percent,
based on an average
annual rainfall, as compared to no runoff management controls.
The total suspended solids removal has been mo
deled in WinSLAMM version 10.
5
. According to
the WinSLAMM modeling the expected TSS removal from the entire site is
99.69
%
(
excluding
the proposed grass swales)
the proposed design meets the requirements of NR151.122. See
Appendix D
for the WinSLAMM modeling inputs and outputs.
4.2
Infiltration
NR 151 requires that the post
-
development site infiltrate
90
% of the pre
-
development runoff based
on
an average annual rainfall. Using WinSLAMM and HydroCAD the results show that the post
-
development site infiltrates
99.94
%
of the average annual rainfall utilizing the
infiltration basin
for infiltration.
See
Appendix D
for input and output results using HydroCAD and WinSLAMM
and soil report for measured infiltration.
4.3
Peak Discharge
According to NR151.123(1), BMPs shall be employed to maintain or reduce the peak runoff
discharge rates, to the maximum extent practicable, as compared to pre
-
development conditions
.
The pre
-
development and post
-
development peak rates of discharge leaving the site are
summarized in the table below.
Curve numbers
used for the modeling of this site were
Class C
soil
s
per the soil borings completed by Star Environmental.
See
Appendix
C
for HydroCAD
modeling routing diagrams, summaries, and node listings.
Pre
-
Development
Post
-
Development
Total (
E1
)
Total (
2
L)
1
-
year 24
-
hour Peak Flow
0.
00
cfs
0.
00
cfs
2
-
year 24
-
hour Peak Flow
0.
00
cfs
0.
00
cfs
10
-
year 24
-
hour Peak Flow
0.
01
cfs
0.
00
cfs
100
-
year 24
-
hour Peak Flow
0.95
cfs
0.
60
cfs
4.4
Protective Area
According to NR151.125(4)(e) areas of post
-
construction sites from which the runoff does not
enter the surface water, including wetlands, without first being treated by a BMP to meet the
requirements of 151.122 to 151.123, are exempt from meeting the requi
rements of the Protective
Areas performance standards.
Not applicable.
Storm Water Management
6
Vreeland
Land Surveyors & Engineers
Project #
2
6
-
0159
4.5
Summary
The modeling of this site shows that the requirements set by the Department of Natural Resources
for total suspended solids, peak discharge, and infiltration can all be met with the proposed design.
T
h
e
site is overdesigned to
alleviate
the con
cerns of the community of stormwater ru
n
off.
The Storm Water Management Plan shows basic compliance with accepted engineering practice in
hydrology planning and design. The resulting development will function as a positive addition to
the community while sustaining environmental benefits in storm wat
er management and quality.
5.0
CONSTRUCTION SITE
PERFORMANCE STANDARDS
5.1
Erosion Control
The purpose of this control plan is to provide guidelines that comply with the state and local
requirements, as well as to make recommendations regarding erosion control and storm water
management. The construction of this development is a critical phase i
n terms of storm water
management and runoff control. Construction site erosion control will help minimize the impact of
development, enhance and protect local environment, and protect the surrounding project area by
applying best management practices for
erosion control at construction sites. This work shall be
planned and executed in accordance with the Wisconsin Department of Natural Resources Storm
Water Management Technical Standards and/or accepted local engineering practice. The
owner/developer will
be responsible for erosion control during the pro
cess of construction. S
ilt
fence,
site vegetation,
inlet protection, tracking pad
,
and erosion mat
will be utilized to keep
sediment from leaving the construction site.
5.2
Construction Site Erosion Control Measures
The following erosion control devices may be used on the project site at any time during the
construction phases to ensure the compliance with NR 216 and local erosion control requirements,
as applicable.
a)
Silt Fence (WDNR 1056)
Continuous silt fencing will be required along all areas downstream of disturbed area
, and around
the base of all stockpiled material subject to
sediment
transport
ation during rain fall events
(stockpiled topsoil, gravel base, etc.).
The silt fencing will provide a siltation barrier between the
disturbed area and any inlets and ultimately downstream water bodies. All silt fence
shall be
removed upon completion of the project or when disturbed areas have generated sufficient
vegetation to prevent erosion and the threat of sediment reaching inlets and bodies of water.
b)
Site Vegetation
Existing site vegetation outside of project limits shall be protected and maintained to the
maximum extent practicable. Existing site vegetation within the project limits shall remain
undisturbed until construction schedule warrants disturbance. For dist
urbed areas
vegetation that
resists erosion, maintains slow storm water velocities, and retains
sediment from runoff shall be
provided by the contractor
. Temporary seeding may be required for disturbed areas that are subject
to long periods of construction inactivity. Temporary vegetation is used when areas are disturbed
and may remain unfinished long enough to allow vegetation to grow and assist with ero
sion
control. Permanent vegetation is encouraged as soon as possible in the construction process.
c)
Tracking Pad (WDNR 1057)
Stone tracking pads will be constructed at all entrances to the construction site to minimize
sediment tracking onto existing streets. A minimum of one construction entrance is required for
Storm Water Management
7
Vreeland
Land Surveyors & Engineers
Project #
2
6
-
0159
the project site. Tracking pads are temporary and will be removed or much of the aggregate will be
removed before the site is completed.
d)
Non
-
channel Erosion Mat (WDNR 1052)
The purpose of this practice is to protect the soil surface from the erosive effect of rainfall and
prevent sheet erosion during the establishment of grass or other vegetation, and to reduce soil
moisture loss due to evaporation. This practice applies to b
oth Erosion Control Re
-
vegetative Mats
(ECRM) and Turf
-
Reinforcement Mats (TRM).
1.
CLASS I: A short
-
term duration (minimum of 6 months), light duty, organic mat
with photodegradable plastic or biodegradable netting.
a.
Type A
–
Use on erodible slopes 2.5:1 or flatter.
b.
Type B
–
Double netted product for use on erodible slopes 2:1 or flatter.
e)
Waste and Material Disposal
All waste and unused building materials (including garbage, debris, cleaning wastes, or other
construction materials) shall be properly disposed of and not allowed to be carried by runoff into a
receiving channel or inlet.
5.3
Operation and Maintenance, Short
-
term
The owner of this project is directly responsible for implementation and maintenance of the
construction site erosion control measures.
The Contractor shall conduct the following inspections:
Weekly inspections of implemented erosion and sediment controls.
Inspections of erosion and sediment controls within 24 hours after precipitation event 0.5
inches or greater which results in runoff during active construction periods.
The Contractor shall maintain weekly written reports of all inspections that include:
The date, time, and exact place of the inspection.
The name of the individual who performed the inspection.
An assessment of the condition of erosion and sediment controls.
A description of any erosion and sediment control implementation and maintenance
performed.
A description of the present phase of construction at the site.
Repairs shall be made immediately, as required, to maintain effectiveness, until permanent
vegetation is established. All repairs to erosion control devices shall be documented on the
Wisconsin Department of Natural Resources Construction Site Inspection
Report (Form 3400
-
187). A copy of Form 3400
-
187 can be found in
Appendix F
.
5.4
Operation and Maintenance, Long
-
term
The OWNER of this project is directly responsible for the operation, inspection, and maintenance
of all storm water facilities located within the project site, as described below.
Bioretention basin
:
Inspection: Look for accumulation of sediment and/or debris in basin and riprap. Length
of time water is retained in basin. Look for erosion or damage. Review plant health;
look for weeds and grasses encroaching on plants.
Maintenance: Remove accumulated sediment deposits and/or debris in basin and riprap
and repair any eroded or damaged grass areas. Remove any identified weeds or grasses.
Storm Water Management
8
Vreeland
Land Surveyors & Engineers
Project #
2
6
-
0159
Do not plow/store snow in bio
-
retention basin.
Annually mow the side slopes to reduce
brush and other large root vegetation that may weaken the berms.
Once every five years,
deep
-
till infiltration basin promotes infiltration
.
Grass Swale:
Inspection:
Look
for accumulation of sediment and/or debris in pond and riprap. Look for
erosion or damage. Review p
lant/grass health.
Maintenance: Remove accumulated sediment deposits and/or debris in
swale
and riprap
and repair any eroded or damaged grass areas. If water is retained for more than 24
-
48
hours after a storm even
t
, replace topsoil by removing
the top
6” of topsoil, tilling bottom
of basin, installing new topsoil and restoring grass in basin.
6.0
SOIL AND SEDIMENT LOSS DISCHARGE
The
Wisconsin DNR requires that all construction sites must lose less than 5 tons per acre of
sediment during the construction of the project. The DNR Soil Loss & Sediment Discharge
Calculation Tool version
2
.0 was used to determine the construction site sediment discharge.
Using the
worst
-
case
scenario of a fully disturbed site and the maximum possible flow length, the
calculations show that the soil loss is
1.7
tons/acre and the sediment discharge is
1.
0
tons/acre.
This assumes
silt fence
sediment control practices. This meets the DNR requirements.
Calculations are shown in
Appendix E
.
Soil Loss map
shows the worst case scenario.
APPENDIX A
Location Map
APPENDIX B
Geotechnical Data
Hydrologic Soil Group—Vilas County, Wisconsin
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
5/28/2026
Page 1 of 4
5088610 5088640 5088670 5088700 5088730 5088760 5088790 5088820 5088850 5088880
5088610 5088640 5088670 5088700 5088730 5088760 5088790 5088820 5088850
324880 324910 324940 324970 325000 325030 325060
324880 324910 324940 324970 325000 325030 325060
45° 55' 52'' N
89° 15' 32'' W
45° 55' 52'' N
89° 15' 22'' W
45° 55' 43'' N
89° 15' 32'' W
45° 55' 43'' N
89° 15' 22'' W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 16N WGS84
0 50 100 200 300
Feet
0 15 30 60 90
Meters
Map Scale: 1:1,340 if printed on A portrait (8.5" x 11") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Lines
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Points
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:20,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Vilas County, Wisconsin
Survey Area Data: Version 23, Sep 10, 2025
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Aug 16, 2021—Sep
1, 2021
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Hydrologic Soil Group—Vilas County, Wisconsin
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
5/28/2026
Page 2 of 4
Hydrologic Soil Group
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
3174B Rubicon sand, 0 to 6
percent slopes
A 3.1 100.0%
Totals for Area of Interest 3.1 100.0%
Description
Hydrologic soil groups are based on estimates of runoff potential. Soils are
assigned to one of four groups according to the rate of water infiltration when the
soils are not protected by vegetation, are thoroughly wet, and receive
precipitation from long-duration storms.
The soils in the United States are assigned to four groups (A, B, C, and D) and
three dual classes (A/D, B/D, and C/D). The groups are defined as follows:
Group A. Soils having a high infiltration rate (low runoff potential) when
thoroughly wet. These consist mainly of deep, well drained to excessively
drained sands or gravelly sands. These soils have a high rate of water
transmission.
Group B. Soils having a moderate infiltration rate when thoroughly wet. These
consist chiefly of moderately deep or deep, moderately well drained or well
drained soils that have moderately fine texture to moderately coarse texture.
These soils have a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet. These consist
chiefly of soils having a layer that impedes the downward movement of water or
soils of moderately fine texture or fine texture. These soils have a slow rate of
water transmission.
Group D. Soils having a very slow infiltration rate (high runoff potential) when
thoroughly wet. These consist chiefly of clays that have a high shrink-swell
potential, soils that have a high water table, soils that have a claypan or clay
layer at or near the surface, and soils that are shallow over nearly impervious
material. These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is
for drained areas and the second is for undrained areas. Only the soils that in
their natural condition are in group D are assigned to dual classes.
Rating Options
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Hydrologic Soil Group—Vilas County, Wisconsin
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
5/28/2026
Page 3 of 4
Tie-break Rule: Higher
Hydrologic Soil Group—Vilas County, Wisconsin
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
5/28/2026
Page 4 of 4
APPENDIX C
Existing
& Proposed
Drainage Map
and Calculations
1645.4
PROP1" = 60' STAMP/SIGNATURE:SURVEYED BY: OTHERSDESIGNER: DUSTIN VREELANDFILE NO.: 26-0159 PROJECT:LOCATION:REVISIONSDATEBYDESCRIPTION
SHEETSCALE:ORIGINAL PLAN DATE: 5/28/26
TITLE PAGE:
PREPARED FOR:PLAN DATE:
D1
D1
D2
D2
D3
D3
D4
D4
P1
P2
P3
P4
1L
link
Routing Diagram for 26-0159 north
Prepared by Vreeland Associates, Printed 7/1/2026
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Subcat
Reach
Pond
Link
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 2
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Rainfall Events Listing
Event#
Event
Name
Storm Type
Curve
Mode
Duration
(hours)
B/B
Depth
(inches)
AMC
1
1-Year
MSE 24-hr
4
Default
24.00
1
2.22
2
2
2-Year
MSE 24-hr
4
Default
24.00
1
2.56
2
3
10-Year
MSE 24-hr
4
Default
24.00
1
3.79
2
4
100-Year
MSE 24-hr
4
Default
24.00
1
6.43
2
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 3
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Area Listing (all nodes)
Area
(acres)
CN
Description
(subcatchment-numbers)
0.369
39
>75% Grass cover, Good, HSG A (D1, D2, D3, D4)
0.026
98
basin (D1, D2, D3, D4)
0.656
98
building (D1, D2, D3, D4)
0.504
98
parking lot (D1, D2, D3)
1.555
84
TOTAL AREA
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 4
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Pipe Listing (all nodes)
Line#
Node
Number
In-Invert
(feet)
Out-Invert
(feet)
Length
(feet)
Slope
(ft/ft)
n
Width
(inches)
Diam/Height
(inches)
Inside-Fill
(inches)
Node
Name
1
P1
1,642.15
1,642.00
55.0
0.0027
0.012
0.0
12.0
0.0
2
P2
1,643.15
1,643.00
55.0
0.0027
0.012
0.0
12.0
0.0
3
P4
1,643.63
1,643.52
40.0
0.0028
0.012
0.0
12.0
0.0
MSE 24-hr 4 1-Year Rainfall=2.22"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 5
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Time span=0.00-40.00 hrs, dt=0.05 hrs, 801 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Runoff Area=0.421 ac 90.02% Impervious Runoff Depth=1.79"
Subcatchment
D1:
D1
Tc=10.0 min CN=WQ Runoff=0.91 cfs 0.063 af
Runoff Area=0.934 ac 78.59% Impervious Runoff Depth=1.57"
Subcatchment
D2:
D2
Tc=10.0 min CN=WQ Runoff=1.75 cfs 0.122 af
Runoff Area=0.081 ac 39.51% Impervious Runoff Depth=0.79"
Subcatchment
D3:
D3
Tc=10.0 min CN=WQ Runoff=0.08 cfs 0.005 af
Runoff Area=0.119 ac 34.45% Impervious Runoff Depth=0.69"
Subcatchment
D4:
D4
Tc=10.0 min CN=WQ Runoff=0.10 cfs 0.007 af
Peak Elev=1,643.07' Storage=468 cf Inflow=0.91 cfs 0.063 af
Pond
P1:
Discarded=0.06 cfs 0.036 af Primary=0.69 cfs 0.027 af Secondary=0.00 cfs 0.000 af Outflow=0.73 cfs 0.063 af
Peak Elev=1,643.07' Storage=3,142 cf Inflow=2.44 cfs 0.149 af
Pond
P2:
Discarded=0.31 cfs 0.149 af Primary=0.00 cfs 0.000 af Secondary=0.00 cfs 0.000 af Outflow=0.31 cfs 0.149 af
Peak Elev=1,641.70' Storage=69 cf Inflow=0.08 cfs 0.005 af
Pond
P3:
Discarded=0.01 cfs 0.005 af Primary=0.00 cfs 0.000 af Secondary=0.00 cfs 0.000 af Outflow=0.01 cfs 0.005 af
Peak Elev=1,642.01' Storage=85 cf Inflow=0.10 cfs 0.007 af
Pond
P4:
Discarded=0.04 cfs 0.007 af Primary=0.00 cfs 0.000 af Outflow=0.04 cfs 0.007 af
Inflow=0.00 cfs 0.000 af
Link
1L:
link
Primary=0.00 cfs 0.000 af
Total Runoff Area = 1.555 ac Runoff Volume = 0.197 af Average Runoff Depth = 1.52"
23.73% Pervious = 0.369 ac 76.27% Impervious = 1.186 ac
MSE 24-hr 4 1-Year Rainfall=2.22"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 6
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment D1: D1
Runoff
=
0.91 cfs
@
12.17 hrs
, Volume=
0.063 af
, Depth=
1.79"
Routed to Pond P1 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 1-Year Rainfall=2.22"
Area (ac)
CN
Description
*
0.110
98
parking lot
*
0.268
98
building
*
0.001
98
basin
0.042
39
>75% Grass cover, Good, HSG A
0.421
Weighted Average
0.042
9.98% Pervious Area
0.379
90.02% Impervious Area
Tc
Length
Slope
Velocity
Capacity
Description
(min)
(feet)
(ft/ft)
(ft/sec)
(cfs)
10.0
Direct Entry, minimum
Subcatchment D1: D1
Runoff
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
1
0
MSE 24-hr 4
1-Year Rainfall=2.22"
Runoff Area=0.421 ac
Runoff Volume=0.063 af
Runoff Depth=1.79"
Tc=10.0 min
CN=WQ
0.91 cfs
MSE 24-hr 4 1-Year Rainfall=2.22"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 7
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment D2: D2
Runoff
=
1.75 cfs
@
12.17 hrs
, Volume=
0.122 af
, Depth=
1.57"
Routed to Pond P2 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 1-Year Rainfall=2.22"
Area (ac)
CN
Description
*
0.014
98
basin
*
0.387
98
parking lot
0.200
39
>75% Grass cover, Good, HSG A
*
0.333
98
building
0.934
Weighted Average
0.200
21.41% Pervious Area
0.734
78.59% Impervious Area
Tc
Length
Slope
Velocity
Capacity
Description
(min)
(feet)
(ft/ft)
(ft/sec)
(cfs)
10.0
Direct Entry, minimum
Subcatchment D2: D2
Runoff
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
1
0
MSE 24-hr 4
1-Year Rainfall=2.22"
Runoff Area=0.934 ac
Runoff Volume=0.122 af
Runoff Depth=1.57"
Tc=10.0 min
CN=WQ
1.75 cfs
MSE 24-hr 4 1-Year Rainfall=2.22"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 8
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment D3: D3
Runoff
=
0.08 cfs
@
12.17 hrs
, Volume=
0.005 af
, Depth=
0.79"
Routed to Pond P3 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 1-Year Rainfall=2.22"
Area (ac)
CN
Description
*
0.007
98
parking lot
*
0.021
98
building
*
0.004
98
basin
0.049
39
>75% Grass cover, Good, HSG A
0.081
Weighted Average
0.049
60.49% Pervious Area
0.032
39.51% Impervious Area
Tc
Length
Slope
Velocity
Capacity
Description
(min)
(feet)
(ft/ft)
(ft/sec)
(cfs)
10.0
Direct Entry, minimum
Subcatchment D3: D3
Runoff
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
0.085
0.08
0.075
0.07
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
MSE 24-hr 4
1-Year Rainfall=2.22"
Runoff Area=0.081 ac
Runoff Volume=0.005 af
Runoff Depth=0.79"
Tc=10.0 min
CN=WQ
0.08 cfs
MSE 24-hr 4 1-Year Rainfall=2.22"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 9
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment D4: D4
Runoff
=
0.10 cfs
@
12.17 hrs
, Volume=
0.007 af
, Depth=
0.69"
Routed to Pond P4 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 1-Year Rainfall=2.22"
Area (ac)
CN
Description
*
0.034
98
building
*
0.007
98
basin
0.078
39
>75% Grass cover, Good, HSG A
0.119
Weighted Average
0.078
65.55% Pervious Area
0.041
34.45% Impervious Area
Tc
Length
Slope
Velocity
Capacity
Description
(min)
(feet)
(ft/ft)
(ft/sec)
(cfs)
10.0
Direct Entry, miminum
Subcatchment D4: D4
Runoff
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
0.105
0.1
0.095
0.09
0.085
0.08
0.075
0.07
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
MSE 24-hr 4
1-Year Rainfall=2.22"
Runoff Area=0.119 ac
Runoff Volume=0.007 af
Runoff Depth=0.69"
Tc=10.0 min
CN=WQ
0.10 cfs
MSE 24-hr 4 1-Year Rainfall=2.22"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 10
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Pond P1:
[87] Warning: Oscillations may require smaller dt or Finer Routing (severity=1)
Inflow Area =
0.421 ac
,
90.02%
Impervious
, Inflow Depth =
1.79"
for 1-Year event
Inflow
=
0.91 cfs
@
12.17 hrs
, Volume=
0.063 af
Outflow
=
0.73 cfs
@
12.17 hrs
, Volume=
0.063 af
, Atten= 19%
, Lag= 0.1 min
Discarded
=
0.06 cfs
@
12.71 hrs
, Volume=
0.036 af
Primary
=
0.69 cfs
@
12.17 hrs
, Volume=
0.027 af
Routed to Pond P2 :
Secondary
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
Routed to Link 1L : link
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,643.07'
@ 12.71 hrs
Surf.Area= 737 sf
Storage= 468 cf
Plug-Flow detention time=
(not calculated: outflow precedes inflow)
Center-of-Mass det. time=
46.3 min ( 811.3 - 765.0 )
Volume
Invert
Avail.Storage
Storage Description
#1
1,642.00'
8,625 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
#2
1,640.00'
81 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
300 cf Overall
x 27.0% Voids
8,706 cf
Total Available Storage
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,642.00
150
0
0
1,643.00
550
350
350
1,644.00
1,120
835
1,185
1,645.00
1,880
1,500
2,685
1,646.00
10,000
5,940
8,625
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,640.00
150
0
0
1,642.00
150
300
300
Device
Routing
Invert
Outlet Devices
#1
Secondary
1,644.70'
5.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head
(feet)
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
2.00
2.50
3.00
Coef.
(English)
2.69
2.72
2.75
2.85
2.98
3.08
3.20
3.28
3.31
3.30
3.31
3.32
#2
Discarded
1,640.00'
3.600 in/hr Exfiltration over Surface area
#3
Primary
1,642.15'
12.0" Round Culvert
L=
55.0'
RCP,
square
edge
headwall,
Ke=
0.500
Inlet
/
Outlet
Invert=
1,642.15'
/
1,642.00'
S=
0.0027
'/'
Cc=
0.900
n=
0.012,
Flow
Area=
0.79
sf
MSE 24-hr 4 1-Year Rainfall=2.22"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 11
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Discarded OutFlow
Max=0.06 cfs
@ 12.71 hrs
HW=1,643.07'
(Free Discharge)
2=Exfiltration
(Exfiltration Controls 0.06 cfs)
Primary OutFlow
Max=0.36 cfs
@ 12.17 hrs
HW=1,642.70'
TW=1,642.63'
(Dynamic Tailwater)
3=Culvert
(Outlet Controls 0.36 cfs @ 1.17 fps)
Secondary OutFlow
Max=0.00 cfs
@ 0.00 hrs
HW=1,640.00'
TW=0.00'
(Dynamic Tailwater)
1=Broad-Crested Rectangular Weir
( Controls 0.00 cfs)
Pond P1:
Inflow
Outflow
Discarded
Primary
Secondary
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
1
0
Inflow Area=0.421 ac
Peak Elev=1,643.07'
Storage=468 cf
0.91 cfs
0.73 cfs
0.06 cfs
0.69 cfs
0.00 cfs
MSE 24-hr 4 1-Year Rainfall=2.22"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 12
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Pond P2:
[87] Warning: Oscillations may require smaller dt or Finer Routing (severity=14)
[80] Warning: Exceeded Pond P1 by 0.06' @ 12.30 hrs (0.59 cfs 0.013 af)
Inflow Area =
1.355 ac
,
82.14%
Impervious
, Inflow Depth =
1.32"
for 1-Year event
Inflow
=
2.44 cfs
@
12.17 hrs
, Volume=
0.149 af
Outflow
=
0.31 cfs
@
12.66 hrs
, Volume=
0.149 af
, Atten= 87%
, Lag= 29.4 min
Discarded
=
0.31 cfs
@
12.66 hrs
, Volume=
0.149 af
Primary
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
Routed to Link 1L : link
Secondary
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
Routed to Pond P3 :
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,643.07'
@ 12.66 hrs
Surf.Area= 3,684 sf
Storage= 3,142 cf
Plug-Flow detention time=
(not calculated: outflow precedes inflow)
Center-of-Mass det. time=
120.0 min ( 881.4 - 761.4 )
Volume
Invert
Avail.Storage
Storage Description
#1
1,641.00'
19,450 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
#2
1,639.00'
270 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
1,000 cf Overall
x 27.0% Voids
19,720 cf
Total Available Storage
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,641.00
500
0
0
1,642.00
900
700
700
1,643.00
3,040
1,970
2,670
1,644.00
5,260
4,150
6,820
1,645.00
20,000
12,630
19,450
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,639.00
500
0
0
1,641.00
500
1,000
1,000
Device
Routing
Invert
Outlet Devices
#1
Primary
1,644.79'
10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head
(feet)
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
2.00
2.50
3.00
Coef.
(English)
2.69
2.72
2.75
2.85
2.98
3.08
3.20
3.28
3.31
3.30
3.31
3.32
#2
Discarded
1,639.00'
3.600 in/hr Exfiltration over Surface area
#3
Secondary
1,643.15'
12.0" Round Culvert
L=
55.0'
RCP,
square
edge
headwall,
Ke=
0.500
Inlet
/
Outlet
Invert=
1,643.15'
/
1,643.00'
S=
0.0027
'/'
Cc=
0.900
n=
0.012,
Flow
Area=
0.79
sf
MSE 24-hr 4 1-Year Rainfall=2.22"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 13
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Discarded OutFlow
Max=0.31 cfs
@ 12.66 hrs
HW=1,643.06'
(Free Discharge)
2=Exfiltration
(Exfiltration Controls 0.31 cfs)
Primary OutFlow
Max=0.00 cfs
@ 0.00 hrs
HW=1,639.00'
TW=0.00'
(Dynamic Tailwater)
1=Broad-Crested Rectangular Weir
( Controls 0.00 cfs)
Secondary OutFlow
Max=0.00 cfs
@ 0.00 hrs
HW=1,639.00'
TW=1,640.00'
(Dynamic Tailwater)
3=Culvert
( Controls 0.00 cfs)
Pond P2:
Inflow
Outflow
Discarded
Primary
Secondary
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
2
1
0
Inflow Area=1.355 ac
Peak Elev=1,643.07'
Storage=3,142 cf
2.44 cfs
0.31 cfs
0.31 cfs
0.00 cfs
0.00 cfs
MSE 24-hr 4 1-Year Rainfall=2.22"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 14
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Pond P3:
[92] Warning: Device #1 is above defined storage
[87] Warning: Oscillations may require smaller dt or Finer Routing (severity=90)
Inflow Area =
0.081 ac
,
39.51%
Impervious
, Inflow Depth =
0.79"
for 1-Year event
Inflow
=
0.08 cfs
@
12.17 hrs
, Volume=
0.005 af
Outflow
=
0.01 cfs
@
11.90 hrs
, Volume=
0.005 af
, Atten= 84%
, Lag= 0.0 min
Discarded
=
0.01 cfs
@
11.90 hrs
, Volume=
0.005 af
Primary
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
Routed to Pond P4 :
Secondary
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
Routed to Link 1L : link
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,641.70'
@ 12.61 hrs
Surf.Area= 150 sf
Storage= 69 cf
Plug-Flow detention time=
(not calculated: outflow precedes inflow)
Center-of-Mass det. time=
33.0 min ( 798.0 - 765.0 )
Volume
Invert
Avail.Storage
Storage Description
#1
1,642.00'
11,025 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
#2
1,640.00'
81 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
300 cf Overall
x 27.0% Voids
11,106 cf
Total Available Storage
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,642.00
150
0
0
1,643.00
2,100
1,125
1,125
1,644.00
3,850
2,975
4,100
1,645.00
10,000
6,925
11,025
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,640.00
150
0
0
1,642.00
150
300
300
Device
Routing
Invert
Outlet Devices
#1
Secondary
1,645.11'
10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head
(feet)
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
2.00
2.50
3.00
Coef.
(English)
2.69
2.72
2.75
2.85
2.98
3.08
3.20
3.28
3.31
3.30
3.31
3.32
#2
Discarded
1,640.00'
3.600 in/hr Exfiltration over Surface area
#3
Primary
1,643.00'
5.0' long + 4.0 '/' SideZ x 10.0' breadth Broad-Crested Rectangular Weir
Head
(feet)
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
Coef.
(English)
2.49
2.56
2.70
2.69
2.68
2.69
2.67
2.64
MSE 24-hr 4 1-Year Rainfall=2.22"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 15
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Discarded OutFlow
Max=0.01 cfs
@ 11.90 hrs
HW=1,640.07'
(Free Discharge)
2=Exfiltration
(Exfiltration Controls 0.01 cfs)
Primary OutFlow
Max=0.00 cfs
@ 0.00 hrs
HW=1,640.00'
TW=1,640.00'
(Dynamic Tailwater)
3=Broad-Crested Rectangular Weir
( Controls 0.00 cfs)
Secondary OutFlow
Max=0.00 cfs
@ 0.00 hrs
HW=1,640.00'
TW=0.00'
(Dynamic Tailwater)
1=Broad-Crested Rectangular Weir
( Controls 0.00 cfs)
Pond P3:
Inflow
Outflow
Discarded
Primary
Secondary
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
0.085
0.08
0.075
0.07
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
Inflow Area=0.081 ac
Peak Elev=1,641.70'
Storage=69 cf
0.08 cfs
0.01 cfs
0.01 cfs
0.00 cfs
0.00 cfs
MSE 24-hr 4 1-Year Rainfall=2.22"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 16
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Pond P4:
[87] Warning: Oscillations may require smaller dt or Finer Routing (severity=84)
Inflow Area =
0.200 ac
,
36.50%
Impervious
, Inflow Depth =
0.41"
for 1-Year event
Inflow
=
0.10 cfs
@
12.17 hrs
, Volume=
0.007 af
Outflow
=
0.04 cfs
@
12.35 hrs
, Volume=
0.007 af
, Atten= 62%
, Lag= 10.8 min
Discarded
=
0.04 cfs
@
12.35 hrs
, Volume=
0.007 af
Primary
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
Routed to Link 1L : link
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,642.01'
@ 12.35 hrs
Surf.Area= 445 sf
Storage= 85 cf
Plug-Flow detention time=
(not calculated: outflow precedes inflow)
Center-of-Mass det. time=
38.4 min ( 803.4 - 765.0 )
Volume
Invert
Avail.Storage
Storage Description
#1
1,642.00'
11,085 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
#2
1,640.00'
81 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
300 cf Overall
x 27.0% Voids
11,166 cf
Total Available Storage
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,642.00
270
0
0
1,643.00
2,100
1,185
1,185
1,644.00
3,850
2,975
4,160
1,645.00
10,000
6,925
11,085
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,640.00
150
0
0
1,642.00
150
300
300
Device
Routing
Invert
Outlet Devices
#1
Primary
1,644.00'
10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head
(feet)
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
2.00
2.50
3.00
Coef.
(English)
2.69
2.72
2.75
2.85
2.98
3.08
3.20
3.28
3.31
3.30
3.31
3.32
#2
Discarded
1,640.00'
3.600 in/hr Exfiltration over Surface area
#3
Primary
1,643.63'
12.0" Round Culvert
L=
40.0'
RCP,
rounded
edge
headwall,
Ke=
0.100
Inlet
/
Outlet
Invert=
1,643.63'
/
1,643.52'
S=
0.0028
'/'
Cc=
0.900
n=
0.012,
Flow
Area=
0.79
sf
MSE 24-hr 4 1-Year Rainfall=2.22"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 17
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Discarded OutFlow
Max=0.04 cfs
@ 12.35 hrs
HW=1,642.01'
(Free Discharge)
2=Exfiltration
(Exfiltration Controls 0.04 cfs)
Primary OutFlow
Max=0.00 cfs
@ 0.00 hrs
HW=1,640.00'
TW=0.00'
(Dynamic Tailwater)
1=Broad-Crested Rectangular Weir
( Controls 0.00 cfs)
3=Culvert
( Controls 0.00 cfs)
Pond P4:
Inflow
Outflow
Discarded
Primary
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
0.105
0.1
0.095
0.09
0.085
0.08
0.075
0.07
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
Inflow Area=0.200 ac
Peak Elev=1,642.01'
Storage=85 cf
0.10 cfs
0.04 cfs
0.04 cfs
0.00 cfs
MSE 24-hr 4 1-Year Rainfall=2.22"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 18
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Link 1L: link
Inflow Area =
1.555 ac
,
76.27%
Impervious
, Inflow Depth =
0.00"
for 1-Year event
Inflow
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
Primary
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
, Atten= 0%
, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Link 1L: link
Inflow
Primary
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
1
0
Inflow Area=1.555 ac
0.00 cfs
0.00 cfs
MSE 24-hr 4 2-Year Rainfall=2.56"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 19
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Time span=0.00-40.00 hrs, dt=0.05 hrs, 801 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Runoff Area=0.421 ac 90.02% Impervious Runoff Depth=2.10"
Subcatchment
D1:
D1
Tc=10.0 min CN=WQ Runoff=1.05 cfs 0.074 af
Runoff Area=0.934 ac 78.59% Impervious Runoff Depth=1.83"
Subcatchment
D2:
D2
Tc=10.0 min CN=WQ Runoff=2.04 cfs 0.143 af
Runoff Area=0.081 ac 39.51% Impervious Runoff Depth=0.92"
Subcatchment
D3:
D3
Tc=10.0 min CN=WQ Runoff=0.09 cfs 0.006 af
Runoff Area=0.119 ac 34.45% Impervious Runoff Depth=0.80"
Subcatchment
D4:
D4
Tc=10.0 min CN=WQ Runoff=0.11 cfs 0.008 af
Peak Elev=1,643.24' Storage=576 cf Inflow=1.05 cfs 0.074 af
Pond
P1:
Discarded=0.07 cfs 0.042 af Primary=0.72 cfs 0.031 af Secondary=0.00 cfs 0.000 af Outflow=0.77 cfs 0.074 af
Peak Elev=1,643.23' Storage=3,715 cf Inflow=2.74 cfs 0.174 af
Pond
P2:
Discarded=0.34 cfs 0.173 af Primary=0.00 cfs 0.000 af Secondary=0.02 cfs 0.001 af Outflow=0.35 cfs 0.174 af
Peak Elev=1,642.02' Storage=85 cf Inflow=0.09 cfs 0.007 af
Pond
P3:
Discarded=0.03 cfs 0.007 af Primary=0.00 cfs 0.000 af Secondary=0.00 cfs 0.000 af Outflow=0.03 cfs 0.007 af
Peak Elev=1,642.05' Storage=95 cf Inflow=0.11 cfs 0.008 af
Pond
P4:
Discarded=0.04 cfs 0.008 af Primary=0.00 cfs 0.000 af Outflow=0.04 cfs 0.008 af
Inflow=0.00 cfs 0.000 af
Link
1L:
link
Primary=0.00 cfs 0.000 af
Total Runoff Area = 1.555 ac Runoff Volume = 0.230 af Average Runoff Depth = 1.78"
23.73% Pervious = 0.369 ac 76.27% Impervious = 1.186 ac
MSE 24-hr 4 2-Year Rainfall=2.56"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 20
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment D1: D1
Runoff
=
1.05 cfs
@
12.17 hrs
, Volume=
0.074 af
, Depth=
2.10"
Routed to Pond P1 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 2-Year Rainfall=2.56"
Area (ac)
CN
Description
*
0.110
98
parking lot
*
0.268
98
building
*
0.001
98
basin
0.042
39
>75% Grass cover, Good, HSG A
0.421
Weighted Average
0.042
9.98% Pervious Area
0.379
90.02% Impervious Area
Tc
Length
Slope
Velocity
Capacity
Description
(min)
(feet)
(ft/ft)
(ft/sec)
(cfs)
10.0
Direct Entry, minimum
Subcatchment D1: D1
Runoff
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
1
0
MSE 24-hr 4
2-Year Rainfall=2.56"
Runoff Area=0.421 ac
Runoff Volume=0.074 af
Runoff Depth=2.10"
Tc=10.0 min
CN=WQ
1.05 cfs
MSE 24-hr 4 2-Year Rainfall=2.56"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 21
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment D2: D2
Runoff
=
2.04 cfs
@
12.17 hrs
, Volume=
0.143 af
, Depth=
1.83"
Routed to Pond P2 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 2-Year Rainfall=2.56"
Area (ac)
CN
Description
*
0.014
98
basin
*
0.387
98
parking lot
0.200
39
>75% Grass cover, Good, HSG A
*
0.333
98
building
0.934
Weighted Average
0.200
21.41% Pervious Area
0.734
78.59% Impervious Area
Tc
Length
Slope
Velocity
Capacity
Description
(min)
(feet)
(ft/ft)
(ft/sec)
(cfs)
10.0
Direct Entry, minimum
Subcatchment D2: D2
Runoff
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
2
1
0
MSE 24-hr 4
2-Year Rainfall=2.56"
Runoff Area=0.934 ac
Runoff Volume=0.143 af
Runoff Depth=1.83"
Tc=10.0 min
CN=WQ
2.04 cfs
MSE 24-hr 4 2-Year Rainfall=2.56"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 22
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment D3: D3
Runoff
=
0.09 cfs
@
12.17 hrs
, Volume=
0.006 af
, Depth=
0.92"
Routed to Pond P3 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 2-Year Rainfall=2.56"
Area (ac)
CN
Description
*
0.007
98
parking lot
*
0.021
98
building
*
0.004
98
basin
0.049
39
>75% Grass cover, Good, HSG A
0.081
Weighted Average
0.049
60.49% Pervious Area
0.032
39.51% Impervious Area
Tc
Length
Slope
Velocity
Capacity
Description
(min)
(feet)
(ft/ft)
(ft/sec)
(cfs)
10.0
Direct Entry, minimum
Subcatchment D3: D3
Runoff
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
0.095
0.09
0.085
0.08
0.075
0.07
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
MSE 24-hr 4
2-Year Rainfall=2.56"
Runoff Area=0.081 ac
Runoff Volume=0.006 af
Runoff Depth=0.92"
Tc=10.0 min
CN=WQ
0.09 cfs
MSE 24-hr 4 2-Year Rainfall=2.56"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 23
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment D4: D4
Runoff
=
0.11 cfs
@
12.17 hrs
, Volume=
0.008 af
, Depth=
0.80"
Routed to Pond P4 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 2-Year Rainfall=2.56"
Area (ac)
CN
Description
*
0.034
98
building
*
0.007
98
basin
0.078
39
>75% Grass cover, Good, HSG A
0.119
Weighted Average
0.078
65.55% Pervious Area
0.041
34.45% Impervious Area
Tc
Length
Slope
Velocity
Capacity
Description
(min)
(feet)
(ft/ft)
(ft/sec)
(cfs)
10.0
Direct Entry, miminum
Subcatchment D4: D4
Runoff
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
0.125
0.12
0.115
0.11
0.105
0.1
0.095
0.09
0.085
0.08
0.075
0.07
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
MSE 24-hr 4
2-Year Rainfall=2.56"
Runoff Area=0.119 ac
Runoff Volume=0.008 af
Runoff Depth=0.80"
Tc=10.0 min
CN=WQ
0.11 cfs
MSE 24-hr 4 2-Year Rainfall=2.56"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 24
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Pond P1:
Inflow Area =
0.421 ac
,
90.02%
Impervious
, Inflow Depth =
2.10"
for 2-Year event
Inflow
=
1.05 cfs
@
12.17 hrs
, Volume=
0.074 af
Outflow
=
0.77 cfs
@
12.18 hrs
, Volume=
0.074 af
, Atten= 26%
, Lag= 0.6 min
Discarded
=
0.07 cfs
@
12.71 hrs
, Volume=
0.042 af
Primary
=
0.72 cfs
@
12.18 hrs
, Volume=
0.031 af
Routed to Pond P2 :
Secondary
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
Routed to Link 1L : link
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,643.24'
@ 12.71 hrs
Surf.Area= 834 sf
Storage= 576 cf
Plug-Flow detention time=
(not calculated: outflow precedes inflow)
Center-of-Mass det. time=
49.6 min ( 811.5 - 762.0 )
Volume
Invert
Avail.Storage
Storage Description
#1
1,642.00'
8,625 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
#2
1,640.00'
81 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
300 cf Overall
x 27.0% Voids
8,706 cf
Total Available Storage
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,642.00
150
0
0
1,643.00
550
350
350
1,644.00
1,120
835
1,185
1,645.00
1,880
1,500
2,685
1,646.00
10,000
5,940
8,625
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,640.00
150
0
0
1,642.00
150
300
300
Device
Routing
Invert
Outlet Devices
#1
Secondary
1,644.70'
5.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head
(feet)
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
2.00
2.50
3.00
Coef.
(English)
2.69
2.72
2.75
2.85
2.98
3.08
3.20
3.28
3.31
3.30
3.31
3.32
#2
Discarded
1,640.00'
3.600 in/hr Exfiltration over Surface area
#3
Primary
1,642.15'
12.0" Round Culvert
L=
55.0'
RCP,
square
edge
headwall,
Ke=
0.500
Inlet
/
Outlet
Invert=
1,642.15'
/
1,642.00'
S=
0.0027
'/'
Cc=
0.900
n=
0.012,
Flow
Area=
0.79
sf
MSE 24-hr 4 2-Year Rainfall=2.56"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 25
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Discarded OutFlow
Max=0.07 cfs
@ 12.71 hrs
HW=1,643.23'
(Free Discharge)
2=Exfiltration
(Exfiltration Controls 0.07 cfs)
Primary OutFlow
Max=0.00 cfs
@ 12.18 hrs
HW=1,642.81'
TW=1,642.83'
(Dynamic Tailwater)
3=Culvert
( Controls 0.00 cfs)
Secondary OutFlow
Max=0.00 cfs
@ 0.00 hrs
HW=1,640.00'
TW=0.00'
(Dynamic Tailwater)
1=Broad-Crested Rectangular Weir
( Controls 0.00 cfs)
Pond P1:
Inflow
Outflow
Discarded
Primary
Secondary
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
1
0
Inflow Area=0.421 ac
Peak Elev=1,643.24'
Storage=576 cf
1.05 cfs
0.77 cfs
0.07 cfs
0.72 cfs
0.00 cfs
MSE 24-hr 4 2-Year Rainfall=2.56"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 26
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Pond P2:
[87] Warning: Oscillations may require smaller dt or Finer Routing (severity=7)
[80] Warning: Exceeded Pond P1 by 0.08' @ 12.25 hrs (0.75 cfs 0.019 af)
Inflow Area =
1.355 ac
,
82.14%
Impervious
, Inflow Depth =
1.54"
for 2-Year event
Inflow
=
2.74 cfs
@
12.17 hrs
, Volume=
0.174 af
Outflow
=
0.35 cfs
@
12.66 hrs
, Volume=
0.174 af
, Atten= 87%
, Lag= 29.3 min
Discarded
=
0.34 cfs
@
12.66 hrs
, Volume=
0.173 af
Primary
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
Routed to Link 1L : link
Secondary
=
0.02 cfs
@
12.66 hrs
, Volume=
0.001 af
Routed to Pond P3 :
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,643.23'
@ 12.66 hrs
Surf.Area= 4,061 sf
Storage= 3,715 cf
Plug-Flow detention time=
(not calculated: outflow precedes inflow)
Center-of-Mass det. time=
128.1 min ( 887.3 - 759.2 )
Volume
Invert
Avail.Storage
Storage Description
#1
1,641.00'
19,450 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
#2
1,639.00'
270 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
1,000 cf Overall
x 27.0% Voids
19,720 cf
Total Available Storage
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,641.00
500
0
0
1,642.00
900
700
700
1,643.00
3,040
1,970
2,670
1,644.00
5,260
4,150
6,820
1,645.00
20,000
12,630
19,450
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,639.00
500
0
0
1,641.00
500
1,000
1,000
Device
Routing
Invert
Outlet Devices
#1
Primary
1,644.79'
10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head
(feet)
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
2.00
2.50
3.00
Coef.
(English)
2.69
2.72
2.75
2.85
2.98
3.08
3.20
3.28
3.31
3.30
3.31
3.32
#2
Discarded
1,639.00'
3.600 in/hr Exfiltration over Surface area
#3
Secondary
1,643.15'
12.0" Round Culvert
L=
55.0'
RCP,
square
edge
headwall,
Ke=
0.500
Inlet
/
Outlet
Invert=
1,643.15'
/
1,643.00'
S=
0.0027
'/'
Cc=
0.900
n=
0.012,
Flow
Area=
0.79
sf
MSE 24-hr 4 2-Year Rainfall=2.56"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 27
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Discarded OutFlow
Max=0.34 cfs
@ 12.66 hrs
HW=1,643.23'
(Free Discharge)
2=Exfiltration
(Exfiltration Controls 0.34 cfs)
Primary OutFlow
Max=0.00 cfs
@ 0.00 hrs
HW=1,639.00'
TW=0.00'
(Dynamic Tailwater)
1=Broad-Crested Rectangular Weir
( Controls 0.00 cfs)
Secondary OutFlow
Max=0.02 cfs
@ 12.66 hrs
HW=1,643.23'
TW=1,642.02'
(Dynamic Tailwater)
3=Culvert
(Barrel Controls 0.02 cfs @ 0.79 fps)
Pond P2:
Inflow
Outflow
Discarded
Primary
Secondary
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
3
2
1
0
Inflow Area=1.355 ac
Peak Elev=1,643.23'
Storage=3,715 cf
2.74 cfs
0.35 cfs
0.34 cfs
0.00 cfs
0.02 cfs
MSE 24-hr 4 2-Year Rainfall=2.56"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 28
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Pond P3:
[92] Warning: Device #1 is above defined storage
[87] Warning: Oscillations may require smaller dt or Finer Routing (severity=83)
Inflow Area =
0.081 ac
,
39.51%
Impervious
, Inflow Depth =
1.03"
for 2-Year event
Inflow
=
0.09 cfs
@
12.17 hrs
, Volume=
0.007 af
Outflow
=
0.03 cfs
@
12.67 hrs
, Volume=
0.007 af
, Atten= 68%
, Lag= 30.1 min
Discarded
=
0.03 cfs
@
12.67 hrs
, Volume=
0.007 af
Primary
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
Routed to Pond P4 :
Secondary
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
Routed to Link 1L : link
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,642.02'
@ 12.67 hrs
Surf.Area= 341 sf
Storage= 85 cf
Plug-Flow detention time=
(not calculated: outflow precedes inflow)
Center-of-Mass det. time=
39.3 min ( 801.8 - 762.4 )
Volume
Invert
Avail.Storage
Storage Description
#1
1,642.00'
11,025 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
#2
1,640.00'
81 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
300 cf Overall
x 27.0% Voids
11,106 cf
Total Available Storage
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,642.00
150
0
0
1,643.00
2,100
1,125
1,125
1,644.00
3,850
2,975
4,100
1,645.00
10,000
6,925
11,025
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,640.00
150
0
0
1,642.00
150
300
300
Device
Routing
Invert
Outlet Devices
#1
Secondary
1,645.11'
10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head
(feet)
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
2.00
2.50
3.00
Coef.
(English)
2.69
2.72
2.75
2.85
2.98
3.08
3.20
3.28
3.31
3.30
3.31
3.32
#2
Discarded
1,640.00'
3.600 in/hr Exfiltration over Surface area
#3
Primary
1,643.00'
5.0' long + 4.0 '/' SideZ x 10.0' breadth Broad-Crested Rectangular Weir
Head
(feet)
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
Coef.
(English)
2.49
2.56
2.70
2.69
2.68
2.69
2.67
2.64
MSE 24-hr 4 2-Year Rainfall=2.56"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 29
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Discarded OutFlow
Max=0.03 cfs
@ 12.67 hrs
HW=1,642.02'
(Free Discharge)
2=Exfiltration
(Exfiltration Controls 0.03 cfs)
Primary OutFlow
Max=0.00 cfs
@ 0.00 hrs
HW=1,640.00'
TW=1,640.00'
(Dynamic Tailwater)
3=Broad-Crested Rectangular Weir
( Controls 0.00 cfs)
Secondary OutFlow
Max=0.00 cfs
@ 0.00 hrs
HW=1,640.00'
TW=0.00'
(Dynamic Tailwater)
1=Broad-Crested Rectangular Weir
( Controls 0.00 cfs)
Pond P3:
Inflow
Outflow
Discarded
Primary
Secondary
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
0.095
0.09
0.085
0.08
0.075
0.07
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
Inflow Area=0.081 ac
Peak Elev=1,642.02'
Storage=85 cf
0.09 cfs
0.03 cfs
0.03 cfs
0.00 cfs
0.00 cfs
MSE 24-hr 4 2-Year Rainfall=2.56"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 30
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Pond P4:
[87] Warning: Oscillations may require smaller dt or Finer Routing (severity=82)
Inflow Area =
0.200 ac
,
36.50%
Impervious
, Inflow Depth =
0.48"
for 2-Year event
Inflow
=
0.11 cfs
@
12.17 hrs
, Volume=
0.008 af
Outflow
=
0.04 cfs
@
12.38 hrs
, Volume=
0.008 af
, Atten= 63%
, Lag= 12.8 min
Discarded
=
0.04 cfs
@
12.38 hrs
, Volume=
0.008 af
Primary
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
Routed to Link 1L : link
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,642.05'
@ 12.38 hrs
Surf.Area= 503 sf
Storage= 95 cf
Plug-Flow detention time=
(not calculated: outflow precedes inflow)
Center-of-Mass det. time=
36.9 min ( 798.8 - 762.0 )
Volume
Invert
Avail.Storage
Storage Description
#1
1,642.00'
11,085 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
#2
1,640.00'
81 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
300 cf Overall
x 27.0% Voids
11,166 cf
Total Available Storage
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,642.00
270
0
0
1,643.00
2,100
1,185
1,185
1,644.00
3,850
2,975
4,160
1,645.00
10,000
6,925
11,085
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,640.00
150
0
0
1,642.00
150
300
300
Device
Routing
Invert
Outlet Devices
#1
Primary
1,644.00'
10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head
(feet)
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
2.00
2.50
3.00
Coef.
(English)
2.69
2.72
2.75
2.85
2.98
3.08
3.20
3.28
3.31
3.30
3.31
3.32
#2
Discarded
1,640.00'
3.600 in/hr Exfiltration over Surface area
#3
Primary
1,643.63'
12.0" Round Culvert
L=
40.0'
RCP,
rounded
edge
headwall,
Ke=
0.100
Inlet
/
Outlet
Invert=
1,643.63'
/
1,643.52'
S=
0.0028
'/'
Cc=
0.900
n=
0.012,
Flow
Area=
0.79
sf
MSE 24-hr 4 2-Year Rainfall=2.56"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 31
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Discarded OutFlow
Max=0.04 cfs
@ 12.38 hrs
HW=1,642.04'
(Free Discharge)
2=Exfiltration
(Exfiltration Controls 0.04 cfs)
Primary OutFlow
Max=0.00 cfs
@ 0.00 hrs
HW=1,640.00'
TW=0.00'
(Dynamic Tailwater)
1=Broad-Crested Rectangular Weir
( Controls 0.00 cfs)
3=Culvert
( Controls 0.00 cfs)
Pond P4:
Inflow
Outflow
Discarded
Primary
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
0.125
0.12
0.115
0.11
0.105
0.1
0.095
0.09
0.085
0.08
0.075
0.07
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
Inflow Area=0.200 ac
Peak Elev=1,642.05'
Storage=95 cf
0.11 cfs
0.04 cfs
0.04 cfs
0.00 cfs
MSE 24-hr 4 2-Year Rainfall=2.56"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 32
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Link 1L: link
Inflow Area =
1.555 ac
,
76.27%
Impervious
, Inflow Depth =
0.00"
for 2-Year event
Inflow
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
Primary
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
, Atten= 0%
, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Link 1L: link
Inflow
Primary
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
1
0
Inflow Area=1.555 ac
0.00 cfs
0.00 cfs
MSE 24-hr 4 10-Year Rainfall=3.79"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 33
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Time span=0.00-40.00 hrs, dt=0.05 hrs, 801 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Runoff Area=0.421 ac 90.02% Impervious Runoff Depth=3.20"
Subcatchment
D1:
D1
Tc=10.0 min CN=WQ Runoff=1.57 cfs 0.112 af
Runoff Area=0.934 ac 78.59% Impervious Runoff Depth=2.80"
Subcatchment
D2:
D2
Tc=10.0 min CN=WQ Runoff=3.04 cfs 0.218 af
Runoff Area=0.081 ac 39.51% Impervious Runoff Depth=1.42"
Subcatchment
D3:
D3
Tc=10.0 min CN=WQ Runoff=0.13 cfs 0.010 af
Runoff Area=0.119 ac 34.45% Impervious Runoff Depth=1.24"
Subcatchment
D4:
D4
Tc=10.0 min CN=WQ Runoff=0.17 cfs 0.012 af
Peak Elev=1,643.63' Storage=895 cf Inflow=1.57 cfs 0.112 af
Pond
P1:
Discarded=0.09 cfs 0.056 af Primary=0.95 cfs 0.056 af Secondary=0.00 cfs 0.000 af Outflow=1.02 cfs 0.112 af
Peak Elev=1,643.63' Storage=5,298 cf Inflow=4.00 cfs 0.274 af
Pond
P2:
Discarded=0.41 cfs 0.231 af Primary=0.00 cfs 0.000 af Secondary=0.57 cfs 0.044 af Outflow=0.98 cfs 0.274 af
Peak Elev=1,643.01' Storage=1,223 cf Inflow=0.60 cfs 0.053 af
Pond
P3:
Discarded=0.19 cfs 0.053 af Primary=0.01 cfs 0.000 af Secondary=0.00 cfs 0.000 af Outflow=0.20 cfs 0.053 af
Peak Elev=1,642.17' Storage=152 cf Inflow=0.17 cfs 0.012 af
Pond
P4:
Discarded=0.06 cfs 0.012 af Primary=0.00 cfs 0.000 af Outflow=0.06 cfs 0.012 af
Inflow=0.00 cfs 0.000 af
Link
1L:
link
Primary=0.00 cfs 0.000 af
Total Runoff Area = 1.555 ac Runoff Volume = 0.352 af Average Runoff Depth = 2.72"
23.73% Pervious = 0.369 ac 76.27% Impervious = 1.186 ac
MSE 24-hr 4 10-Year Rainfall=3.79"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 34
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment D1: D1
Runoff
=
1.57 cfs
@
12.17 hrs
, Volume=
0.112 af
, Depth=
3.20"
Routed to Pond P1 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 10-Year Rainfall=3.79"
Area (ac)
CN
Description
*
0.110
98
parking lot
*
0.268
98
building
*
0.001
98
basin
0.042
39
>75% Grass cover, Good, HSG A
0.421
Weighted Average
0.042
9.98% Pervious Area
0.379
90.02% Impervious Area
Tc
Length
Slope
Velocity
Capacity
Description
(min)
(feet)
(ft/ft)
(ft/sec)
(cfs)
10.0
Direct Entry, minimum
Subcatchment D1: D1
Runoff
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
1
0
MSE 24-hr 4
10-Year Rainfall=3.79"
Runoff Area=0.421 ac
Runoff Volume=0.112 af
Runoff Depth=3.20"
Tc=10.0 min
CN=WQ
1.57 cfs
MSE 24-hr 4 10-Year Rainfall=3.79"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 35
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment D2: D2
Runoff
=
3.04 cfs
@
12.17 hrs
, Volume=
0.218 af
, Depth=
2.80"
Routed to Pond P2 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 10-Year Rainfall=3.79"
Area (ac)
CN
Description
*
0.014
98
basin
*
0.387
98
parking lot
0.200
39
>75% Grass cover, Good, HSG A
*
0.333
98
building
0.934
Weighted Average
0.200
21.41% Pervious Area
0.734
78.59% Impervious Area
Tc
Length
Slope
Velocity
Capacity
Description
(min)
(feet)
(ft/ft)
(ft/sec)
(cfs)
10.0
Direct Entry, minimum
Subcatchment D2: D2
Runoff
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
3
2
1
0
MSE 24-hr 4
10-Year Rainfall=3.79"
Runoff Area=0.934 ac
Runoff Volume=0.218 af
Runoff Depth=2.80"
Tc=10.0 min
CN=WQ
3.04 cfs
MSE 24-hr 4 10-Year Rainfall=3.79"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 36
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment D3: D3
Runoff
=
0.13 cfs
@
12.17 hrs
, Volume=
0.010 af
, Depth=
1.42"
Routed to Pond P3 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 10-Year Rainfall=3.79"
Area (ac)
CN
Description
*
0.007
98
parking lot
*
0.021
98
building
*
0.004
98
basin
0.049
39
>75% Grass cover, Good, HSG A
0.081
Weighted Average
0.049
60.49% Pervious Area
0.032
39.51% Impervious Area
Tc
Length
Slope
Velocity
Capacity
Description
(min)
(feet)
(ft/ft)
(ft/sec)
(cfs)
10.0
Direct Entry, minimum
Subcatchment D3: D3
Runoff
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
0.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
MSE 24-hr 4
10-Year Rainfall=3.79"
Runoff Area=0.081 ac
Runoff Volume=0.010 af
Runoff Depth=1.42"
Tc=10.0 min
CN=WQ
0.13 cfs
MSE 24-hr 4 10-Year Rainfall=3.79"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 37
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment D4: D4
Runoff
=
0.17 cfs
@
12.17 hrs
, Volume=
0.012 af
, Depth=
1.24"
Routed to Pond P4 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 10-Year Rainfall=3.79"
Area (ac)
CN
Description
*
0.034
98
building
*
0.007
98
basin
0.078
39
>75% Grass cover, Good, HSG A
0.119
Weighted Average
0.078
65.55% Pervious Area
0.041
34.45% Impervious Area
Tc
Length
Slope
Velocity
Capacity
Description
(min)
(feet)
(ft/ft)
(ft/sec)
(cfs)
10.0
Direct Entry, miminum
Subcatchment D4: D4
Runoff
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
0.19
0.18
0.17
0.16
0.15
0.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
MSE 24-hr 4
10-Year Rainfall=3.79"
Runoff Area=0.119 ac
Runoff Volume=0.012 af
Runoff Depth=1.24"
Tc=10.0 min
CN=WQ
0.17 cfs
MSE 24-hr 4 10-Year Rainfall=3.79"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 38
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Pond P1:
[87] Warning: Oscillations may require smaller dt or Finer Routing (severity=8)
Inflow Area =
0.421 ac
,
90.02%
Impervious
, Inflow Depth =
3.20"
for 10-Year event
Inflow
=
1.57 cfs
@
12.17 hrs
, Volume=
0.112 af
Outflow
=
1.02 cfs
@
12.17 hrs
, Volume=
0.112 af
, Atten= 35%
, Lag= 0.0 min
Discarded
=
0.09 cfs
@
12.54 hrs
, Volume=
0.056 af
Primary
=
0.95 cfs
@
12.17 hrs
, Volume=
0.056 af
Routed to Pond P2 :
Secondary
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
Routed to Link 1L : link
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,643.63'
@ 12.54 hrs
Surf.Area= 1,062 sf
Storage= 895 cf
Plug-Flow detention time=
48.9 min calculated for 0.112 af (100% of inflow)
Center-of-Mass det. time=
49.1 min ( 804.0 - 754.9 )
Volume
Invert
Avail.Storage
Storage Description
#1
1,642.00'
8,625 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
#2
1,640.00'
81 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
300 cf Overall
x 27.0% Voids
8,706 cf
Total Available Storage
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,642.00
150
0
0
1,643.00
550
350
350
1,644.00
1,120
835
1,185
1,645.00
1,880
1,500
2,685
1,646.00
10,000
5,940
8,625
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,640.00
150
0
0
1,642.00
150
300
300
Device
Routing
Invert
Outlet Devices
#1
Secondary
1,644.70'
5.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head
(feet)
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
2.00
2.50
3.00
Coef.
(English)
2.69
2.72
2.75
2.85
2.98
3.08
3.20
3.28
3.31
3.30
3.31
3.32
#2
Discarded
1,640.00'
3.600 in/hr Exfiltration over Surface area
#3
Primary
1,642.15'
12.0" Round Culvert
L=
55.0'
RCP,
square
edge
headwall,
Ke=
0.500
Inlet
/
Outlet
Invert=
1,642.15'
/
1,642.00'
S=
0.0027
'/'
Cc=
0.900
n=
0.012,
Flow
Area=
0.79
sf
MSE 24-hr 4 10-Year Rainfall=3.79"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 39
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Discarded OutFlow
Max=0.09 cfs
@ 12.54 hrs
HW=1,643.63'
(Free Discharge)
2=Exfiltration
(Exfiltration Controls 0.09 cfs)
Primary OutFlow
Max=0.00 cfs
@ 12.17 hrs
HW=1,643.16'
TW=1,643.25'
(Dynamic Tailwater)
3=Culvert
( Controls 0.00 cfs)
Secondary OutFlow
Max=0.00 cfs
@ 0.00 hrs
HW=1,640.00'
TW=0.00'
(Dynamic Tailwater)
1=Broad-Crested Rectangular Weir
( Controls 0.00 cfs)
Pond P1:
Inflow
Outflow
Discarded
Primary
Secondary
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
1
0
Inflow Area=0.421 ac
Peak Elev=1,643.63'
Storage=895 cf
1.57 cfs
1.02 cfs
0.09 cfs
0.95 cfs
0.00 cfs
MSE 24-hr 4 10-Year Rainfall=3.79"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 40
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Pond P2:
[80] Warning: Exceeded Pond P1 by 0.10' @ 12.20 hrs (1.18 cfs 0.028 af)
Inflow Area =
1.355 ac
,
82.14%
Impervious
, Inflow Depth =
2.43"
for 10-Year event
Inflow
=
4.00 cfs
@
12.17 hrs
, Volume=
0.274 af
Outflow
=
0.98 cfs
@
12.49 hrs
, Volume=
0.274 af
, Atten= 75%
, Lag= 19.5 min
Discarded
=
0.41 cfs
@
12.49 hrs
, Volume=
0.231 af
Primary
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
Routed to Link 1L : link
Secondary
=
0.57 cfs
@
12.49 hrs
, Volume=
0.044 af
Routed to Pond P3 :
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,643.63'
@ 12.49 hrs
Surf.Area= 4,940 sf
Storage= 5,298 cf
Plug-Flow detention time=
(not calculated: outflow precedes inflow)
Center-of-Mass det. time=
119.4 min ( 873.9 - 754.5 )
Volume
Invert
Avail.Storage
Storage Description
#1
1,641.00'
19,450 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
#2
1,639.00'
270 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
1,000 cf Overall
x 27.0% Voids
19,720 cf
Total Available Storage
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,641.00
500
0
0
1,642.00
900
700
700
1,643.00
3,040
1,970
2,670
1,644.00
5,260
4,150
6,820
1,645.00
20,000
12,630
19,450
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,639.00
500
0
0
1,641.00
500
1,000
1,000
Device
Routing
Invert
Outlet Devices
#1
Primary
1,644.79'
10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head
(feet)
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
2.00
2.50
3.00
Coef.
(English)
2.69
2.72
2.75
2.85
2.98
3.08
3.20
3.28
3.31
3.30
3.31
3.32
#2
Discarded
1,639.00'
3.600 in/hr Exfiltration over Surface area
#3
Secondary
1,643.15'
12.0" Round Culvert
L=
55.0'
RCP,
square
edge
headwall,
Ke=
0.500
Inlet
/
Outlet
Invert=
1,643.15'
/
1,643.00'
S=
0.0027
'/'
Cc=
0.900
n=
0.012,
Flow
Area=
0.79
sf
MSE 24-hr 4 10-Year Rainfall=3.79"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 41
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Discarded OutFlow
Max=0.41 cfs
@ 12.49 hrs
HW=1,643.63'
(Free Discharge)
2=Exfiltration
(Exfiltration Controls 0.41 cfs)
Primary OutFlow
Max=0.00 cfs
@ 0.00 hrs
HW=1,639.00'
TW=0.00'
(Dynamic Tailwater)
1=Broad-Crested Rectangular Weir
( Controls 0.00 cfs)
Secondary OutFlow
Max=0.57 cfs
@ 12.49 hrs
HW=1,643.63'
TW=1,642.61'
(Dynamic Tailwater)
3=Culvert
(Barrel Controls 0.57 cfs @ 2.23 fps)
Pond P2:
Inflow
Outflow
Discarded
Primary
Secondary
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
4
3
2
1
0
Inflow Area=1.355 ac
Peak Elev=1,643.63'
Storage=5,298 cf
4.00 cfs
0.98 cfs
0.41 cfs
0.00 cfs
0.57 cfs
MSE 24-hr 4 10-Year Rainfall=3.79"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 42
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Pond P3:
[92] Warning: Device #1 is above defined storage
[87] Warning: Oscillations may require smaller dt or Finer Routing (severity=49)
Inflow Area =
0.081 ac
,
39.51%
Impervious
, Inflow Depth =
7.88"
for 10-Year event
Inflow
=
0.60 cfs
@
12.47 hrs
, Volume=
0.053 af
Outflow
=
0.20 cfs
@
13.37 hrs
, Volume=
0.053 af
, Atten= 67%
, Lag= 53.7 min
Discarded
=
0.19 cfs
@
13.37 hrs
, Volume=
0.053 af
Primary
=
0.01 cfs
@
13.37 hrs
, Volume=
0.000 af
Routed to Pond P4 :
Secondary
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
Routed to Link 1L : link
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,643.01'
@ 13.37 hrs
Surf.Area= 2,264 sf
Storage= 1,223 cf
Plug-Flow detention time=
(not calculated: outflow precedes inflow)
Center-of-Mass det. time=
78.9 min ( 847.0 - 768.1 )
Volume
Invert
Avail.Storage
Storage Description
#1
1,642.00'
11,025 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
#2
1,640.00'
81 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
300 cf Overall
x 27.0% Voids
11,106 cf
Total Available Storage
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,642.00
150
0
0
1,643.00
2,100
1,125
1,125
1,644.00
3,850
2,975
4,100
1,645.00
10,000
6,925
11,025
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,640.00
150
0
0
1,642.00
150
300
300
Device
Routing
Invert
Outlet Devices
#1
Secondary
1,645.11'
10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head
(feet)
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
2.00
2.50
3.00
Coef.
(English)
2.69
2.72
2.75
2.85
2.98
3.08
3.20
3.28
3.31
3.30
3.31
3.32
#2
Discarded
1,640.00'
3.600 in/hr Exfiltration over Surface area
#3
Primary
1,643.00'
5.0' long + 4.0 '/' SideZ x 10.0' breadth Broad-Crested Rectangular Weir
Head
(feet)
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
Coef.
(English)
2.49
2.56
2.70
2.69
2.68
2.69
2.67
2.64
MSE 24-hr 4 10-Year Rainfall=3.79"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 43
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Discarded OutFlow
Max=0.19 cfs
@ 13.37 hrs
HW=1,643.01'
(Free Discharge)
2=Exfiltration
(Exfiltration Controls 0.19 cfs)
Primary OutFlow
Max=0.01 cfs
@ 13.37 hrs
HW=1,643.01'
TW=1,642.00'
(Dynamic Tailwater)
3=Broad-Crested Rectangular Weir
(Weir Controls 0.01 cfs @ 0.22 fps)
Secondary OutFlow
Max=0.00 cfs
@ 0.00 hrs
HW=1,640.00'
TW=0.00'
(Dynamic Tailwater)
1=Broad-Crested Rectangular Weir
( Controls 0.00 cfs)
Pond P3:
Inflow
Outflow
Discarded
Primary
Secondary
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
0.65
0.6
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
Inflow Area=0.081 ac
Peak Elev=1,643.01'
Storage=1,223 cf
0.60 cfs
0.20 cfs
0.19 cfs
0.01 cfs
0.00 cfs
MSE 24-hr 4 10-Year Rainfall=3.79"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 44
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Pond P4:
[87] Warning: Oscillations may require smaller dt or Finer Routing (severity=75)
Inflow Area =
0.200 ac
,
36.50%
Impervious
, Inflow Depth =
0.75"
for 10-Year event
Inflow
=
0.17 cfs
@
12.17 hrs
, Volume=
0.012 af
Outflow
=
0.06 cfs
@
12.39 hrs
, Volume=
0.012 af
, Atten= 64%
, Lag= 13.3 min
Discarded
=
0.06 cfs
@
12.39 hrs
, Volume=
0.012 af
Primary
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
Routed to Link 1L : link
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,642.17'
@ 12.39 hrs
Surf.Area= 726 sf
Storage= 152 cf
Plug-Flow detention time=
(not calculated: outflow precedes inflow)
Center-of-Mass det. time=
34.5 min ( 795.0 - 760.4 )
Volume
Invert
Avail.Storage
Storage Description
#1
1,642.00'
11,085 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
#2
1,640.00'
81 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
300 cf Overall
x 27.0% Voids
11,166 cf
Total Available Storage
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,642.00
270
0
0
1,643.00
2,100
1,185
1,185
1,644.00
3,850
2,975
4,160
1,645.00
10,000
6,925
11,085
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,640.00
150
0
0
1,642.00
150
300
300
Device
Routing
Invert
Outlet Devices
#1
Primary
1,644.00'
10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head
(feet)
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
2.00
2.50
3.00
Coef.
(English)
2.69
2.72
2.75
2.85
2.98
3.08
3.20
3.28
3.31
3.30
3.31
3.32
#2
Discarded
1,640.00'
3.600 in/hr Exfiltration over Surface area
#3
Primary
1,643.63'
12.0" Round Culvert
L=
40.0'
RCP,
rounded
edge
headwall,
Ke=
0.100
Inlet
/
Outlet
Invert=
1,643.63'
/
1,643.52'
S=
0.0028
'/'
Cc=
0.900
n=
0.012,
Flow
Area=
0.79
sf
MSE 24-hr 4 10-Year Rainfall=3.79"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 45
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Discarded OutFlow
Max=0.06 cfs
@ 12.39 hrs
HW=1,642.17'
(Free Discharge)
2=Exfiltration
(Exfiltration Controls 0.06 cfs)
Primary OutFlow
Max=0.00 cfs
@ 0.00 hrs
HW=1,640.00'
TW=0.00'
(Dynamic Tailwater)
1=Broad-Crested Rectangular Weir
( Controls 0.00 cfs)
3=Culvert
( Controls 0.00 cfs)
Pond P4:
Inflow
Outflow
Discarded
Primary
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
0.19
0.18
0.17
0.16
0.15
0.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
Inflow Area=0.200 ac
Peak Elev=1,642.17'
Storage=152 cf
0.17 cfs
0.06 cfs
0.06 cfs
0.00 cfs
MSE 24-hr 4 10-Year Rainfall=3.79"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 46
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Link 1L: link
Inflow Area =
1.555 ac
,
76.27%
Impervious
, Inflow Depth =
0.00"
for 10-Year event
Inflow
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
Primary
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
, Atten= 0%
, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Link 1L: link
Inflow
Primary
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
1
0
Inflow Area=1.555 ac
0.00 cfs
0.00 cfs
MSE 24-hr 4 100-Year Rainfall=6.43"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 47
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Time span=0.00-40.00 hrs, dt=0.05 hrs, 801 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Runoff Area=0.421 ac 90.02% Impervious Runoff Depth=5.63"
Subcatchment
D1:
D1
Tc=10.0 min CN=WQ Runoff=2.69 cfs 0.198 af
Runoff Area=0.934 ac 78.59% Impervious Runoff Depth=4.99"
Subcatchment
D2:
D2
Tc=10.0 min CN=WQ Runoff=5.24 cfs 0.388 af
Runoff Area=0.081 ac 39.51% Impervious Runoff Depth=2.79"
Subcatchment
D3:
D3
Tc=10.0 min CN=WQ Runoff=0.24 cfs 0.019 af
Runoff Area=0.119 ac 34.45% Impervious Runoff Depth=2.51"
Subcatchment
D4:
D4
Tc=10.0 min CN=WQ Runoff=0.31 cfs 0.025 af
Peak Elev=1,644.22' Storage=1,528 cf Inflow=2.69 cfs 0.198 af
Pond
P1:
Discarded=0.12 cfs 0.078 af Primary=1.43 cfs 0.120 af Secondary=0.00 cfs 0.000 af Outflow=1.54 cfs 0.198 af
Peak Elev=1,644.17' Storage=8,225 cf Inflow=6.65 cfs 0.508 af
Pond
P2:
Discarded=0.69 cfs 0.334 af Primary=0.00 cfs 0.000 af Secondary=2.04 cfs 0.174 af Outflow=2.73 cfs 0.508 af
Peak Elev=1,643.58' Storage=2,725 cf Inflow=2.14 cfs 0.193 af
Pond
P3:
Discarded=0.27 cfs 0.109 af Primary=1.80 cfs 0.084 af Secondary=0.00 cfs 0.000 af Outflow=2.02 cfs 0.193 af
Peak Elev=1,643.58' Storage=2,784 cf Inflow=1.87 cfs 0.109 af
Pond
P4:
Discarded=0.27 cfs 0.109 af Primary=0.00 cfs 0.000 af Outflow=0.27 cfs 0.109 af
Inflow=0.00 cfs 0.000 af
Link
1L:
link
Primary=0.00 cfs 0.000 af
Total Runoff Area = 1.555 ac Runoff Volume = 0.630 af Average Runoff Depth = 4.86"
23.73% Pervious = 0.369 ac 76.27% Impervious = 1.186 ac
MSE 24-hr 4 100-Year Rainfall=6.43"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 48
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment D1: D1
Runoff
=
2.69 cfs
@
12.17 hrs
, Volume=
0.198 af
, Depth=
5.63"
Routed to Pond P1 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 100-Year Rainfall=6.43"
Area (ac)
CN
Description
*
0.110
98
parking lot
*
0.268
98
building
*
0.001
98
basin
0.042
39
>75% Grass cover, Good, HSG A
0.421
Weighted Average
0.042
9.98% Pervious Area
0.379
90.02% Impervious Area
Tc
Length
Slope
Velocity
Capacity
Description
(min)
(feet)
(ft/ft)
(ft/sec)
(cfs)
10.0
Direct Entry, minimum
Subcatchment D1: D1
Runoff
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
3
2
1
0
MSE 24-hr 4
100-Year Rainfall=6.43"
Runoff Area=0.421 ac
Runoff Volume=0.198 af
Runoff Depth=5.63"
Tc=10.0 min
CN=WQ
2.69 cfs
MSE 24-hr 4 100-Year Rainfall=6.43"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 49
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment D2: D2
Runoff
=
5.24 cfs
@
12.17 hrs
, Volume=
0.388 af
, Depth=
4.99"
Routed to Pond P2 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 100-Year Rainfall=6.43"
Area (ac)
CN
Description
*
0.014
98
basin
*
0.387
98
parking lot
0.200
39
>75% Grass cover, Good, HSG A
*
0.333
98
building
0.934
Weighted Average
0.200
21.41% Pervious Area
0.734
78.59% Impervious Area
Tc
Length
Slope
Velocity
Capacity
Description
(min)
(feet)
(ft/ft)
(ft/sec)
(cfs)
10.0
Direct Entry, minimum
Subcatchment D2: D2
Runoff
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
5
4
3
2
1
0
MSE 24-hr 4
100-Year Rainfall=6.43"
Runoff Area=0.934 ac
Runoff Volume=0.388 af
Runoff Depth=4.99"
Tc=10.0 min
CN=WQ
5.24 cfs
MSE 24-hr 4 100-Year Rainfall=6.43"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 50
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment D3: D3
Runoff
=
0.24 cfs
@
12.18 hrs
, Volume=
0.019 af
, Depth=
2.79"
Routed to Pond P3 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 100-Year Rainfall=6.43"
Area (ac)
CN
Description
*
0.007
98
parking lot
*
0.021
98
building
*
0.004
98
basin
0.049
39
>75% Grass cover, Good, HSG A
0.081
Weighted Average
0.049
60.49% Pervious Area
0.032
39.51% Impervious Area
Tc
Length
Slope
Velocity
Capacity
Description
(min)
(feet)
(ft/ft)
(ft/sec)
(cfs)
10.0
Direct Entry, minimum
Subcatchment D3: D3
Runoff
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
0.26
0.25
0.24
0.23
0.22
0.21
0.2
0.19
0.18
0.17
0.16
0.15
0.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
MSE 24-hr 4
100-Year Rainfall=6.43"
Runoff Area=0.081 ac
Runoff Volume=0.019 af
Runoff Depth=2.79"
Tc=10.0 min
CN=WQ
0.24 cfs
MSE 24-hr 4 100-Year Rainfall=6.43"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 51
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment D4: D4
Runoff
=
0.31 cfs
@
12.18 hrs
, Volume=
0.025 af
, Depth=
2.51"
Routed to Pond P4 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 100-Year Rainfall=6.43"
Area (ac)
CN
Description
*
0.034
98
building
*
0.007
98
basin
0.078
39
>75% Grass cover, Good, HSG A
0.119
Weighted Average
0.078
65.55% Pervious Area
0.041
34.45% Impervious Area
Tc
Length
Slope
Velocity
Capacity
Description
(min)
(feet)
(ft/ft)
(ft/sec)
(cfs)
10.0
Direct Entry, miminum
Subcatchment D4: D4
Runoff
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
0.34
0.32
0.3
0.28
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
MSE 24-hr 4
100-Year Rainfall=6.43"
Runoff Area=0.119 ac
Runoff Volume=0.025 af
Runoff Depth=2.51"
Tc=10.0 min
CN=WQ
0.31 cfs
MSE 24-hr 4 100-Year Rainfall=6.43"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 52
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Pond P1:
Inflow Area =
0.421 ac
,
90.02%
Impervious
, Inflow Depth =
5.63"
for 100-Year event
Inflow
=
2.69 cfs
@
12.17 hrs
, Volume=
0.198 af
Outflow
=
1.54 cfs
@
12.19 hrs
, Volume=
0.198 af
, Atten= 43%
, Lag= 1.3 min
Discarded
=
0.12 cfs
@
12.40 hrs
, Volume=
0.078 af
Primary
=
1.43 cfs
@
12.19 hrs
, Volume=
0.120 af
Routed to Pond P2 :
Secondary
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
Routed to Link 1L : link
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,644.22'
@ 12.40 hrs
Surf.Area= 1,436 sf
Storage= 1,528 cf
Plug-Flow detention time=
44.5 min calculated for 0.197 af (100% of inflow)
Center-of-Mass det. time=
44.6 min ( 793.1 - 748.5 )
Volume
Invert
Avail.Storage
Storage Description
#1
1,642.00'
8,625 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
#2
1,640.00'
81 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
300 cf Overall
x 27.0% Voids
8,706 cf
Total Available Storage
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,642.00
150
0
0
1,643.00
550
350
350
1,644.00
1,120
835
1,185
1,645.00
1,880
1,500
2,685
1,646.00
10,000
5,940
8,625
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,640.00
150
0
0
1,642.00
150
300
300
Device
Routing
Invert
Outlet Devices
#1
Secondary
1,644.70'
5.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head
(feet)
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
2.00
2.50
3.00
Coef.
(English)
2.69
2.72
2.75
2.85
2.98
3.08
3.20
3.28
3.31
3.30
3.31
3.32
#2
Discarded
1,640.00'
3.600 in/hr Exfiltration over Surface area
#3
Primary
1,642.15'
12.0" Round Culvert
L=
55.0'
RCP,
square
edge
headwall,
Ke=
0.500
Inlet
/
Outlet
Invert=
1,642.15'
/
1,642.00'
S=
0.0027
'/'
Cc=
0.900
n=
0.012,
Flow
Area=
0.79
sf
MSE 24-hr 4 100-Year Rainfall=6.43"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 53
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Discarded OutFlow
Max=0.12 cfs
@ 12.40 hrs
HW=1,644.22'
(Free Discharge)
2=Exfiltration
(Exfiltration Controls 0.12 cfs)
Primary OutFlow
Max=0.00 cfs
@ 12.19 hrs
HW=1,643.93'
TW=1,643.95'
(Dynamic Tailwater)
3=Culvert
( Controls 0.00 cfs)
Secondary OutFlow
Max=0.00 cfs
@ 0.00 hrs
HW=1,640.00'
TW=0.00'
(Dynamic Tailwater)
1=Broad-Crested Rectangular Weir
( Controls 0.00 cfs)
Pond P1:
Inflow
Outflow
Discarded
Primary
Secondary
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
3
2
1
0
Inflow Area=0.421 ac
Peak Elev=1,644.22'
Storage=1,528 cf
2.69 cfs
1.54 cfs
0.12 cfs
1.43 cfs
0.00 cfs
MSE 24-hr 4 100-Year Rainfall=6.43"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 54
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Pond P2:
[80] Warning: Exceeded Pond P1 by 0.08' @ 12.05 hrs (1.01 cfs 0.038 af)
Inflow Area =
1.355 ac
,
82.14%
Impervious
, Inflow Depth =
4.50"
for 100-Year event
Inflow
=
6.65 cfs
@
12.17 hrs
, Volume=
0.508 af
Outflow
=
2.73 cfs
@
12.39 hrs
, Volume=
0.508 af
, Atten= 59%
, Lag= 13.0 min
Discarded
=
0.69 cfs
@
12.39 hrs
, Volume=
0.334 af
Primary
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
Routed to Link 1L : link
Secondary
=
2.04 cfs
@
12.39 hrs
, Volume=
0.174 af
Routed to Pond P3 :
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,644.17'
@ 12.39 hrs
Surf.Area= 8,319 sf
Storage= 8,225 cf
Plug-Flow detention time=
103.6 min calculated for 0.507 af (100% of inflow)
Center-of-Mass det. time=
103.7 min ( 855.7 - 752.0 )
Volume
Invert
Avail.Storage
Storage Description
#1
1,641.00'
19,450 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
#2
1,639.00'
270 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
1,000 cf Overall
x 27.0% Voids
19,720 cf
Total Available Storage
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,641.00
500
0
0
1,642.00
900
700
700
1,643.00
3,040
1,970
2,670
1,644.00
5,260
4,150
6,820
1,645.00
20,000
12,630
19,450
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,639.00
500
0
0
1,641.00
500
1,000
1,000
Device
Routing
Invert
Outlet Devices
#1
Primary
1,644.79'
10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head
(feet)
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
2.00
2.50
3.00
Coef.
(English)
2.69
2.72
2.75
2.85
2.98
3.08
3.20
3.28
3.31
3.30
3.31
3.32
#2
Discarded
1,639.00'
3.600 in/hr Exfiltration over Surface area
#3
Secondary
1,643.15'
12.0" Round Culvert
L=
55.0'
RCP,
square
edge
headwall,
Ke=
0.500
Inlet
/
Outlet
Invert=
1,643.15'
/
1,643.00'
S=
0.0027
'/'
Cc=
0.900
n=
0.012,
Flow
Area=
0.79
sf
MSE 24-hr 4 100-Year Rainfall=6.43"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 55
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Discarded OutFlow
Max=0.69 cfs
@ 12.39 hrs
HW=1,644.17'
(Free Discharge)
2=Exfiltration
(Exfiltration Controls 0.69 cfs)
Primary OutFlow
Max=0.00 cfs
@ 0.00 hrs
HW=1,639.00'
TW=0.00'
(Dynamic Tailwater)
1=Broad-Crested Rectangular Weir
( Controls 0.00 cfs)
Secondary OutFlow
Max=2.03 cfs
@ 12.39 hrs
HW=1,644.17'
TW=1,643.20'
(Dynamic Tailwater)
3=Culvert
(Barrel Controls 2.03 cfs @ 3.15 fps)
Pond P2:
Inflow
Outflow
Discarded
Primary
Secondary
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
7
6
5
4
3
2
1
0
Inflow Area=1.355 ac
Peak Elev=1,644.17'
Storage=8,225 cf
6.65 cfs
2.73 cfs
0.69 cfs
0.00 cfs
2.04 cfs
MSE 24-hr 4 100-Year Rainfall=6.43"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 56
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Pond P3:
[92] Warning: Device #1 is above defined storage
[87] Warning: Oscillations may require smaller dt or Finer Routing (severity=18)
Inflow Area =
0.081 ac
,
39.51%
Impervious
, Inflow Depth =
28.56"
for 100-Year event
Inflow
=
2.14 cfs
@
12.36 hrs
, Volume=
0.193 af
Outflow
=
2.02 cfs
@
12.53 hrs
, Volume=
0.193 af
, Atten= 5%
, Lag= 10.0 min
Discarded
=
0.27 cfs
@
13.43 hrs
, Volume=
0.109 af
Primary
=
1.80 cfs
@
12.53 hrs
, Volume=
0.084 af
Routed to Pond P4 :
Secondary
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
Routed to Link 1L : link
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,643.58'
@ 13.43 hrs
Surf.Area= 3,269 sf
Storage= 2,725 cf
Plug-Flow detention time=
(not calculated: outflow precedes inflow)
Center-of-Mass det. time=
67.1 min ( 836.6 - 769.5 )
Volume
Invert
Avail.Storage
Storage Description
#1
1,642.00'
11,025 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
#2
1,640.00'
81 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
300 cf Overall
x 27.0% Voids
11,106 cf
Total Available Storage
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,642.00
150
0
0
1,643.00
2,100
1,125
1,125
1,644.00
3,850
2,975
4,100
1,645.00
10,000
6,925
11,025
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,640.00
150
0
0
1,642.00
150
300
300
Device
Routing
Invert
Outlet Devices
#1
Secondary
1,645.11'
10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head
(feet)
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
2.00
2.50
3.00
Coef.
(English)
2.69
2.72
2.75
2.85
2.98
3.08
3.20
3.28
3.31
3.30
3.31
3.32
#2
Discarded
1,640.00'
3.600 in/hr Exfiltration over Surface area
#3
Primary
1,643.00'
5.0' long + 4.0 '/' SideZ x 10.0' breadth Broad-Crested Rectangular Weir
Head
(feet)
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
Coef.
(English)
2.49
2.56
2.70
2.69
2.68
2.69
2.67
2.64
MSE 24-hr 4 100-Year Rainfall=6.43"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 57
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Discarded OutFlow
Max=0.27 cfs
@ 13.43 hrs
HW=1,643.58'
(Free Discharge)
2=Exfiltration
(Exfiltration Controls 0.27 cfs)
Primary OutFlow
Max=1.76 cfs
@ 12.53 hrs
HW=1,643.25'
TW=1,643.02'
(Dynamic Tailwater)
3=Broad-Crested Rectangular Weir
(Weir Controls 1.76 cfs @ 1.19 fps)
Secondary OutFlow
Max=0.00 cfs
@ 0.00 hrs
HW=1,640.00'
TW=0.00'
(Dynamic Tailwater)
1=Broad-Crested Rectangular Weir
( Controls 0.00 cfs)
Pond P3:
Inflow
Outflow
Discarded
Primary
Secondary
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
2
1
0
Inflow Area=0.081 ac
Peak Elev=1,643.58'
Storage=2,725 cf
2.14 cfs
2.02 cfs
0.27 cfs
1.80 cfs
0.00 cfs
MSE 24-hr 4 100-Year Rainfall=6.43"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 58
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Pond P4:
[80] Warning: Exceeded Pond P3 by 0.04' @ 12.70 hrs (1.73 cfs 0.117 af)
Inflow Area =
0.200 ac
,
36.50%
Impervious
, Inflow Depth =
6.52"
for 100-Year event
Inflow
=
1.87 cfs
@
12.52 hrs
, Volume=
0.109 af
Outflow
=
0.27 cfs
@
13.38 hrs
, Volume=
0.109 af
, Atten= 85%
, Lag= 51.8 min
Discarded
=
0.27 cfs
@
13.38 hrs
, Volume=
0.109 af
Primary
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
Routed to Link 1L : link
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,643.58'
@ 13.38 hrs
Surf.Area= 3,268 sf
Storage= 2,784 cf
Plug-Flow detention time=
(not calculated: outflow precedes inflow)
Center-of-Mass det. time=
118.7 min ( 890.8 - 772.2 )
Volume
Invert
Avail.Storage
Storage Description
#1
1,642.00'
11,085 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
#2
1,640.00'
81 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
300 cf Overall
x 27.0% Voids
11,166 cf
Total Available Storage
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,642.00
270
0
0
1,643.00
2,100
1,185
1,185
1,644.00
3,850
2,975
4,160
1,645.00
10,000
6,925
11,085
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,640.00
150
0
0
1,642.00
150
300
300
Device
Routing
Invert
Outlet Devices
#1
Primary
1,644.00'
10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head
(feet)
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
2.00
2.50
3.00
Coef.
(English)
2.69
2.72
2.75
2.85
2.98
3.08
3.20
3.28
3.31
3.30
3.31
3.32
#2
Discarded
1,640.00'
3.600 in/hr Exfiltration over Surface area
#3
Primary
1,643.63'
12.0" Round Culvert
L=
40.0'
RCP,
rounded
edge
headwall,
Ke=
0.100
Inlet
/
Outlet
Invert=
1,643.63'
/
1,643.52'
S=
0.0028
'/'
Cc=
0.900
n=
0.012,
Flow
Area=
0.79
sf
MSE 24-hr 4 100-Year Rainfall=6.43"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 59
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Discarded OutFlow
Max=0.27 cfs
@ 13.38 hrs
HW=1,643.58'
(Free Discharge)
2=Exfiltration
(Exfiltration Controls 0.27 cfs)
Primary OutFlow
Max=0.00 cfs
@ 0.00 hrs
HW=1,640.00'
TW=0.00'
(Dynamic Tailwater)
1=Broad-Crested Rectangular Weir
( Controls 0.00 cfs)
3=Culvert
( Controls 0.00 cfs)
Pond P4:
Inflow
Outflow
Discarded
Primary
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
2
1
0
Inflow Area=0.200 ac
Peak Elev=1,643.58'
Storage=2,784 cf
1.87 cfs
0.27 cfs
0.27 cfs
0.00 cfs
MSE 24-hr 4 100-Year Rainfall=6.43"
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
Page 60
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Link 1L: link
Inflow Area =
1.555 ac
,
76.27%
Impervious
, Inflow Depth =
0.00"
for 100-Year event
Inflow
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
Primary
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
, Atten= 0%
, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Link 1L: link
Inflow
Primary
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
1
0
Inflow Area=1.555 ac
0.00 cfs
0.00 cfs
Table of Contents
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
TABLE OF CONTENTS
Project Reports
1 Routing Diagram
2 Rainfall Events Listing
3 Area Listing (all nodes)
4 Pipe Listing (all nodes)
1-Year Event
5 Node Listing
6 Subcat D1: D1
7 Subcat D2: D2
8 Subcat D3: D3
9 Subcat D4: D4
10 Pond P1:
12 Pond P2:
14 Pond P3:
16 Pond P4:
18 Link 1L: link
2-Year Event
19 Node Listing
20 Subcat D1: D1
21 Subcat D2: D2
22 Subcat D3: D3
23 Subcat D4: D4
24 Pond P1:
26 Pond P2:
28 Pond P3:
30 Pond P4:
32 Link 1L: link
10-Year Event
33 Node Listing
34 Subcat D1: D1
35 Subcat D2: D2
36 Subcat D3: D3
37 Subcat D4: D4
38 Pond P1:
40 Pond P2:
42 Pond P3:
44 Pond P4:
46 Link 1L: link
100-Year Event
47 Node Listing
48 Subcat D1: D1
49 Subcat D2: D2
Table of Contents
26-0159 north
Printed 7/1/2026
Prepared by Vreeland Associates
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
50 Subcat D3: D3
51 Subcat D4: D4
52 Pond P1:
54 Pond P2:
56 Pond P3:
58 Pond P4:
60 Link 1L: link
1S
Runoff
D5
D5
E1
existing
P5
2L
offsite runoff
4L
north
Routing Diagram for 26-0159 south
Prepared by Vreeland Associates, Printed 7/1/2026
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Subcat
Reach
Pond
Link
26-0159 south
Printed 7/1/2026
Prepared by Vreeland Associates
Page 2
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Rainfall Events Listing
Event#
Event
Name
Storm Type
Curve
Mode
Duration
(hours)
B/B
Depth
(inches)
AMC
1
1-Year
MSE 24-hr
4
Default
24.00
1
2.22
2
2
2-Year
MSE 24-hr
4
Default
24.00
1
2.56
2
3
10-Year
MSE 24-hr
4
Default
24.00
1
3.79
2
4
100-Year
MSE 24-hr
4
Default
24.00
1
6.43
2
26-0159 south
Printed 7/1/2026
Prepared by Vreeland Associates
Page 3
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Area Listing (all nodes)
Area
(acres)
CN
Description
(subcatchment-numbers)
2.995
39
>75% Grass cover, Good, HSG A (1S, D5, E1)
0.026
98
basin (D5)
0.513
98
building (D5)
0.331
98
pavement (D5)
3.865
52
TOTAL AREA
MSE 24-hr 4 1-Year Rainfall=2.22"
26-0159 south
Printed 7/1/2026
Prepared by Vreeland Associates
Page 4
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Time span=0.00-40.00 hrs, dt=0.05 hrs, 801 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Runoff Area=0.180 ac 0.00% Impervious Runoff Depth=0.00"
Subcatchment
1S:
Runoff
Tc=10.0 min CN=39 Runoff=0.00 cfs 0.000 af
Runoff Area=0.975 ac 89.23% Impervious Runoff Depth=1.78"
Subcatchment
D5:
D5
Tc=6.0 min CN=WQ Runoff=2.39 cfs 0.144 af
Runoff Area=2.710 ac 0.00% Impervious Runoff Depth=0.00"
Subcatchment
E1:
existing
Tc=10.0 min CN=39 Runoff=0.00 cfs 0.000 af
Peak Elev=1,642.49' Storage=2,781 cf Inflow=2.39 cfs 0.144 af
Pond
P5:
Discarded=0.25 cfs 0.145 af Primary=0.00 cfs 0.000 af Outflow=0.25 cfs 0.145 af
Inflow=0.00 cfs 0.000 af
Link
2L:
offsite
runoff
Primary=0.00 cfs 0.000 af
1-Year Inflow Imported from 26-0159 north~Link 1L.hce Inflow=0.00 cfs 0.000 af
Link
4L:
north
Area= 1.555 ac 76.27% Imperv. Primary=0.00 cfs 0.000 af
Total Runoff Area = 3.865 ac Runoff Volume = 0.144 af Average Runoff Depth = 0.45"
77.49% Pervious = 2.995 ac 22.51% Impervious = 0.870 ac
MSE 24-hr 4 1-Year Rainfall=2.22"
26-0159 south
Printed 7/1/2026
Prepared by Vreeland Associates
Page 5
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: Runoff
[45] Hint: Runoff=Zero
Runoff
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
, Depth=
0.00"
Routed to Link 2L : offsite runoff
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 1-Year Rainfall=2.22"
Area (ac)
CN
Description
0.180
39
>75% Grass cover, Good, HSG A
0.180
100.00% Pervious Area
Tc
Length
Slope
Velocity
Capacity
Description
(min)
(feet)
(ft/ft)
(ft/sec)
(cfs)
10.0
Direct Entry, min
Subcatchment 1S: Runoff
Runoff
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
1
0
MSE 24-hr 4
1-Year Rainfall=2.22"
Runoff Area=0.180 ac
Runoff Volume=0.000 af
Runoff Depth=0.00"
Tc=10.0 min
CN=39
0.00 cfs
MSE 24-hr 4 1-Year Rainfall=2.22"
26-0159 south
Printed 7/1/2026
Prepared by Vreeland Associates
Page 6
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment D5: D5
Runoff
=
2.39 cfs
@
12.13 hrs
, Volume=
0.144 af
, Depth=
1.78"
Routed to Pond P5 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 1-Year Rainfall=2.22"
Area (ac)
CN
Description
*
0.331
98
pavement
*
0.513
98
building
*
0.026
98
basin
0.105
39
>75% Grass cover, Good, HSG A
0.975
Weighted Average
0.105
10.77% Pervious Area
0.870
89.23% Impervious Area
Tc
Length
Slope
Velocity
Capacity
Description
(min)
(feet)
(ft/ft)
(ft/sec)
(cfs)
6.0
Direct Entry,
Subcatchment D5: D5
Runoff
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
2
1
0
MSE 24-hr 4
1-Year Rainfall=2.22"
Runoff Area=0.975 ac
Runoff Volume=0.144 af
Runoff Depth=1.78"
Tc=6.0 min
CN=WQ
2.39 cfs
MSE 24-hr 4 1-Year Rainfall=2.22"
26-0159 south
Printed 7/1/2026
Prepared by Vreeland Associates
Page 7
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment E1: existing
[45] Hint: Runoff=Zero
Runoff
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
, Depth=
0.00"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 1-Year Rainfall=2.22"
Area (ac)
CN
Description
2.710
39
>75% Grass cover, Good, HSG A
2.710
100.00% Pervious Area
Tc
Length
Slope
Velocity
Capacity
Description
(min)
(feet)
(ft/ft)
(ft/sec)
(cfs)
10.0
Direct Entry,
Subcatchment E1: existing
Runoff
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
1
0
MSE 24-hr 4
1-Year Rainfall=2.22"
Runoff Area=2.710 ac
Runoff Volume=0.000 af
Runoff Depth=0.00"
Tc=10.0 min
CN=39
0.00 cfs
MSE 24-hr 4 1-Year Rainfall=2.22"
26-0159 south
Printed 7/1/2026
Prepared by Vreeland Associates
Page 8
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Pond P5:
[87] Warning: Oscillations may require smaller dt or Finer Routing (severity=29)
Inflow Area =
0.975 ac
,
89.23%
Impervious
, Inflow Depth =
1.78"
for 1-Year event
Inflow
=
2.39 cfs
@
12.13 hrs
, Volume=
0.144 af
Outflow
=
0.25 cfs
@
12.66 hrs
, Volume=
0.145 af
, Atten= 90%
, Lag= 31.7 min
Discarded
=
0.25 cfs
@
12.66 hrs
, Volume=
0.145 af
Primary
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
Routed to Link 2L : offsite runoff
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,642.49'
@ 12.66 hrs
Surf.Area= 2,996 sf
Storage= 2,781 cf
Plug-Flow detention time=
(not calculated: outflow precedes inflow)
Center-of-Mass det. time=
107.7 min ( 868.9 - 761.2 )
Volume
Invert
Avail.Storage
Storage Description
#1
1,641.00'
30,420 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
#2
1,639.00'
568 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
1,720 cf Overall
x 33.0% Voids
30,988 cf
Total Available Storage
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,641.00
860
0
0
1,642.00
1,690
1,275
1,275
1,643.00
2,600
2,145
3,420
1,644.00
3,590
3,095
6,515
1,645.00
4,650
4,120
10,635
1,646.00
7,460
6,055
16,690
1,647.00
20,000
13,730
30,420
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,639.00
860
0
0
1,641.00
860
1,720
1,720
Device
Routing
Invert
Outlet Devices
#1
Primary
1,644.60'
10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head
(feet)
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
2.00
2.50
3.00
Coef.
(English)
2.69
2.72
2.75
2.85
2.98
3.08
3.20
3.28
3.31
3.30
3.31
3.32
#2
Discarded
1,639.00'
3.600 in/hr Exfiltration over Surface area
Discarded OutFlow
Max=0.25 cfs
@ 12.66 hrs
HW=1,642.49'
(Free Discharge)
2=Exfiltration
(Exfiltration Controls 0.25 cfs)
Primary OutFlow
Max=0.00 cfs
@ 0.00 hrs
HW=1,639.00'
TW=0.00'
(Dynamic Tailwater)
1=Broad-Crested Rectangular Weir
( Controls 0.00 cfs)
MSE 24-hr 4 1-Year Rainfall=2.22"
26-0159 south
Printed 7/1/2026
Prepared by Vreeland Associates
Page 9
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Pond P5:
Inflow
Outflow
Discarded
Primary
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
2
1
0
Inflow Area=0.975 ac
Peak Elev=1,642.49'
Storage=2,781 cf
2.39 cfs
0.25 cfs
0.25 cfs
0.00 cfs
MSE 24-hr 4 1-Year Rainfall=2.22"
26-0159 south
Printed 7/1/2026
Prepared by Vreeland Associates
Page 10
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Link 2L: offsite runoff
Inflow Area =
2.710 ac
,
75.87%
Impervious
, Inflow Depth =
0.00"
for 1-Year event
Inflow
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
Primary
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
, Atten= 0%
, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Link 2L: offsite runoff
Inflow
Primary
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
1
0
Inflow Area=2.710 ac
0.00 cfs
0.00 cfs
MSE 24-hr 4 1-Year Rainfall=2.22"
26-0159 south
Printed 7/1/2026
Prepared by Vreeland Associates
Page 11
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Link 4L: north
Inflow Area =
1.555 ac
,
76.27%
Impervious
, Inflow Depth =
0.00"
for 1-Year event
Inflow
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
Primary
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
, Atten= 0%
, Lag= 0.0 min
Routed to Link 2L : offsite runoff
Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
1-Year Inflow Imported from 26-0159 north~Link 1L.hce
Link 4L: north
Inflow
Primary
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
1
0
Inflow Area=1.555 ac
1-Year Inflow
Imported from
26-0159 north~Link 1L.hce
Area= 1.555 ac
76.27% Imperv.
0.00 cfs
0.00 cfs
MSE 24-hr 4 2-Year Rainfall=2.56"
26-0159 south
Printed 7/1/2026
Prepared by Vreeland Associates
Page 12
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Time span=0.00-40.00 hrs, dt=0.05 hrs, 801 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Runoff Area=0.180 ac 0.00% Impervious Runoff Depth=0.00"
Subcatchment
1S:
Runoff
Tc=10.0 min CN=39 Runoff=0.00 cfs 0.000 af
Runoff Area=0.975 ac 89.23% Impervious Runoff Depth=2.08"
Subcatchment
D5:
D5
Tc=6.0 min CN=WQ Runoff=2.77 cfs 0.169 af
Runoff Area=2.710 ac 0.00% Impervious Runoff Depth=0.00"
Subcatchment
E1:
existing
Tc=10.0 min CN=39 Runoff=0.00 cfs 0.000 af
Peak Elev=1,642.73' Storage=3,330 cf Inflow=2.77 cfs 0.169 af
Pond
P5:
Discarded=0.27 cfs 0.169 af Primary=0.00 cfs 0.000 af Outflow=0.27 cfs 0.169 af
Inflow=0.00 cfs 0.000 af
Link
2L:
offsite
runoff
Primary=0.00 cfs 0.000 af
2-Year Inflow Imported from 26-0159 north~Link 1L.hce Inflow=0.00 cfs 0.000 af
Link
4L:
north
Area= 1.555 ac 76.27% Imperv. Primary=0.00 cfs 0.000 af
Total Runoff Area = 3.865 ac Runoff Volume = 0.169 af Average Runoff Depth = 0.52"
77.49% Pervious = 2.995 ac 22.51% Impervious = 0.870 ac
MSE 24-hr 4 2-Year Rainfall=2.56"
26-0159 south
Printed 7/1/2026
Prepared by Vreeland Associates
Page 13
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: Runoff
[45] Hint: Runoff=Zero
Runoff
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
, Depth=
0.00"
Routed to Link 2L : offsite runoff
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 2-Year Rainfall=2.56"
Area (ac)
CN
Description
0.180
39
>75% Grass cover, Good, HSG A
0.180
100.00% Pervious Area
Tc
Length
Slope
Velocity
Capacity
Description
(min)
(feet)
(ft/ft)
(ft/sec)
(cfs)
10.0
Direct Entry, min
Subcatchment 1S: Runoff
Runoff
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
1
0
MSE 24-hr 4
2-Year Rainfall=2.56"
Runoff Area=0.180 ac
Runoff Volume=0.000 af
Runoff Depth=0.00"
Tc=10.0 min
CN=39
0.00 cfs
MSE 24-hr 4 2-Year Rainfall=2.56"
26-0159 south
Printed 7/1/2026
Prepared by Vreeland Associates
Page 14
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment D5: D5
Runoff
=
2.77 cfs
@
12.13 hrs
, Volume=
0.169 af
, Depth=
2.08"
Routed to Pond P5 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 2-Year Rainfall=2.56"
Area (ac)
CN
Description
*
0.331
98
pavement
*
0.513
98
building
*
0.026
98
basin
0.105
39
>75% Grass cover, Good, HSG A
0.975
Weighted Average
0.105
10.77% Pervious Area
0.870
89.23% Impervious Area
Tc
Length
Slope
Velocity
Capacity
Description
(min)
(feet)
(ft/ft)
(ft/sec)
(cfs)
6.0
Direct Entry,
Subcatchment D5: D5
Runoff
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
3
2
1
0
MSE 24-hr 4
2-Year Rainfall=2.56"
Runoff Area=0.975 ac
Runoff Volume=0.169 af
Runoff Depth=2.08"
Tc=6.0 min
CN=WQ
2.77 cfs
MSE 24-hr 4 2-Year Rainfall=2.56"
26-0159 south
Printed 7/1/2026
Prepared by Vreeland Associates
Page 15
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment E1: existing
[45] Hint: Runoff=Zero
Runoff
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
, Depth=
0.00"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 2-Year Rainfall=2.56"
Area (ac)
CN
Description
2.710
39
>75% Grass cover, Good, HSG A
2.710
100.00% Pervious Area
Tc
Length
Slope
Velocity
Capacity
Description
(min)
(feet)
(ft/ft)
(ft/sec)
(cfs)
10.0
Direct Entry,
Subcatchment E1: existing
Runoff
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
1
0
MSE 24-hr 4
2-Year Rainfall=2.56"
Runoff Area=2.710 ac
Runoff Volume=0.000 af
Runoff Depth=0.00"
Tc=10.0 min
CN=39
0.00 cfs
MSE 24-hr 4 2-Year Rainfall=2.56"
26-0159 south
Printed 7/1/2026
Prepared by Vreeland Associates
Page 16
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Pond P5:
[87] Warning: Oscillations may require smaller dt or Finer Routing (severity=20)
Inflow Area =
0.975 ac
,
89.23%
Impervious
, Inflow Depth =
2.08"
for 2-Year event
Inflow
=
2.77 cfs
@
12.13 hrs
, Volume=
0.169 af
Outflow
=
0.27 cfs
@
12.72 hrs
, Volume=
0.169 af
, Atten= 90%
, Lag= 35.4 min
Discarded
=
0.27 cfs
@
12.72 hrs
, Volume=
0.169 af
Primary
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
Routed to Link 2L : offsite runoff
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,642.73'
@ 12.72 hrs
Surf.Area= 3,219 sf
Storage= 3,330 cf
Plug-Flow detention time=
(not calculated: outflow precedes inflow)
Center-of-Mass det. time=
121.0 min ( 879.3 - 758.2 )
Volume
Invert
Avail.Storage
Storage Description
#1
1,641.00'
30,420 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
#2
1,639.00'
568 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
1,720 cf Overall
x 33.0% Voids
30,988 cf
Total Available Storage
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,641.00
860
0
0
1,642.00
1,690
1,275
1,275
1,643.00
2,600
2,145
3,420
1,644.00
3,590
3,095
6,515
1,645.00
4,650
4,120
10,635
1,646.00
7,460
6,055
16,690
1,647.00
20,000
13,730
30,420
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,639.00
860
0
0
1,641.00
860
1,720
1,720
Device
Routing
Invert
Outlet Devices
#1
Primary
1,644.60'
10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head
(feet)
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
2.00
2.50
3.00
Coef.
(English)
2.69
2.72
2.75
2.85
2.98
3.08
3.20
3.28
3.31
3.30
3.31
3.32
#2
Discarded
1,639.00'
3.600 in/hr Exfiltration over Surface area
Discarded OutFlow
Max=0.27 cfs
@ 12.72 hrs
HW=1,642.73'
(Free Discharge)
2=Exfiltration
(Exfiltration Controls 0.27 cfs)
Primary OutFlow
Max=0.00 cfs
@ 0.00 hrs
HW=1,639.00'
TW=0.00'
(Dynamic Tailwater)
1=Broad-Crested Rectangular Weir
( Controls 0.00 cfs)
MSE 24-hr 4 2-Year Rainfall=2.56"
26-0159 south
Printed 7/1/2026
Prepared by Vreeland Associates
Page 17
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Pond P5:
Inflow
Outflow
Discarded
Primary
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
3
2
1
0
Inflow Area=0.975 ac
Peak Elev=1,642.73'
Storage=3,330 cf
2.77 cfs
0.27 cfs
0.27 cfs
0.00 cfs
MSE 24-hr 4 2-Year Rainfall=2.56"
26-0159 south
Printed 7/1/2026
Prepared by Vreeland Associates
Page 18
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Link 2L: offsite runoff
Inflow Area =
2.710 ac
,
75.87%
Impervious
, Inflow Depth =
0.00"
for 2-Year event
Inflow
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
Primary
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
, Atten= 0%
, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Link 2L: offsite runoff
Inflow
Primary
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
1
0
Inflow Area=2.710 ac
0.00 cfs
0.00 cfs
MSE 24-hr 4 2-Year Rainfall=2.56"
26-0159 south
Printed 7/1/2026
Prepared by Vreeland Associates
Page 19
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Link 4L: north
Inflow Area =
1.555 ac
,
76.27%
Impervious
, Inflow Depth =
0.00"
for 2-Year event
Inflow
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
Primary
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
, Atten= 0%
, Lag= 0.0 min
Routed to Link 2L : offsite runoff
Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
2-Year Inflow Imported from 26-0159 north~Link 1L.hce
Link 4L: north
Inflow
Primary
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
1
0
Inflow Area=1.555 ac
2-Year Inflow
Imported from
26-0159 north~Link 1L.hce
Area= 1.555 ac
76.27% Imperv.
0.00 cfs
0.00 cfs
MSE 24-hr 4 10-Year Rainfall=3.79"
26-0159 south
Printed 7/1/2026
Prepared by Vreeland Associates
Page 20
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Time span=0.00-40.00 hrs, dt=0.05 hrs, 801 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Runoff Area=0.180 ac 0.00% Impervious Runoff Depth=0.03"
Subcatchment
1S:
Runoff
Tc=10.0 min CN=39 Runoff=0.00 cfs 0.000 af
Runoff Area=0.975 ac 89.23% Impervious Runoff Depth=3.18"
Subcatchment
D5:
D5
Tc=6.0 min CN=WQ Runoff=4.14 cfs 0.258 af
Runoff Area=2.710 ac 0.00% Impervious Runoff Depth=0.03"
Subcatchment
E1:
existing
Tc=10.0 min CN=39 Runoff=0.01 cfs 0.006 af
Peak Elev=1,643.52' Storage=5,464 cf Inflow=4.14 cfs 0.258 af
Pond
P5:
Discarded=0.33 cfs 0.258 af Primary=0.00 cfs 0.000 af Outflow=0.33 cfs 0.258 af
Inflow=0.00 cfs 0.000 af
Link
2L:
offsite
runoff
Primary=0.00 cfs 0.000 af
10-Year Inflow Imported from 26-0159 north~Link 1L.hce Inflow=0.00 cfs 0.000 af
Link
4L:
north
Area= 1.555 ac 76.27% Imperv. Primary=0.00 cfs 0.000 af
Total Runoff Area = 3.865 ac Runoff Volume = 0.264 af Average Runoff Depth = 0.82"
77.49% Pervious = 2.995 ac 22.51% Impervious = 0.870 ac
MSE 24-hr 4 10-Year Rainfall=3.79"
26-0159 south
Printed 7/1/2026
Prepared by Vreeland Associates
Page 21
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: Runoff
Runoff
=
0.00 cfs
@
18.40 hrs
, Volume=
0.000 af
, Depth=
0.03"
Routed to Link 2L : offsite runoff
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 10-Year Rainfall=3.79"
Area (ac)
CN
Description
0.180
39
>75% Grass cover, Good, HSG A
0.180
100.00% Pervious Area
Tc
Length
Slope
Velocity
Capacity
Description
(min)
(feet)
(ft/ft)
(ft/sec)
(cfs)
10.0
Direct Entry, min
Subcatchment 1S: Runoff
Runoff
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
0.001
0.001
0.001
0.001
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0
0
0
MSE 24-hr 4
10-Year Rainfall=3.79"
Runoff Area=0.180 ac
Runoff Volume=0.000 af
Runoff Depth=0.03"
Tc=10.0 min
CN=39
0.00 cfs
MSE 24-hr 4 10-Year Rainfall=3.79"
26-0159 south
Printed 7/1/2026
Prepared by Vreeland Associates
Page 22
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment D5: D5
Runoff
=
4.14 cfs
@
12.13 hrs
, Volume=
0.258 af
, Depth=
3.18"
Routed to Pond P5 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 10-Year Rainfall=3.79"
Area (ac)
CN
Description
*
0.331
98
pavement
*
0.513
98
building
*
0.026
98
basin
0.105
39
>75% Grass cover, Good, HSG A
0.975
Weighted Average
0.105
10.77% Pervious Area
0.870
89.23% Impervious Area
Tc
Length
Slope
Velocity
Capacity
Description
(min)
(feet)
(ft/ft)
(ft/sec)
(cfs)
6.0
Direct Entry,
Subcatchment D5: D5
Runoff
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
4
3
2
1
0
MSE 24-hr 4
10-Year Rainfall=3.79"
Runoff Area=0.975 ac
Runoff Volume=0.258 af
Runoff Depth=3.18"
Tc=6.0 min
CN=WQ
4.14 cfs
MSE 24-hr 4 10-Year Rainfall=3.79"
26-0159 south
Printed 7/1/2026
Prepared by Vreeland Associates
Page 23
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment E1: existing
Runoff
=
0.01 cfs
@
18.40 hrs
, Volume=
0.006 af
, Depth=
0.03"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 10-Year Rainfall=3.79"
Area (ac)
CN
Description
2.710
39
>75% Grass cover, Good, HSG A
2.710
100.00% Pervious Area
Tc
Length
Slope
Velocity
Capacity
Description
(min)
(feet)
(ft/ft)
(ft/sec)
(cfs)
10.0
Direct Entry,
Subcatchment E1: existing
Runoff
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
0.01
0.009
0.009
0.008
0.008
0.007
0.007
0.006
0.006
0.005
0.005
0.004
0.004
0.003
0.003
0.002
0.002
0.001
0.001
0.000
0
MSE 24-hr 4
10-Year Rainfall=3.79"
Runoff Area=2.710 ac
Runoff Volume=0.006 af
Runoff Depth=0.03"
Tc=10.0 min
CN=39
0.01 cfs
MSE 24-hr 4 10-Year Rainfall=3.79"
26-0159 south
Printed 7/1/2026
Prepared by Vreeland Associates
Page 24
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Pond P5:
Inflow Area =
0.975 ac
,
89.23%
Impervious
, Inflow Depth =
3.18"
for 10-Year event
Inflow
=
4.14 cfs
@
12.13 hrs
, Volume=
0.258 af
Outflow
=
0.33 cfs
@
12.99 hrs
, Volume=
0.258 af
, Atten= 92%
, Lag= 51.8 min
Discarded
=
0.33 cfs
@
12.99 hrs
, Volume=
0.258 af
Primary
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
Routed to Link 2L : offsite runoff
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,643.52'
@ 12.99 hrs
Surf.Area= 3,972 sf
Storage= 5,464 cf
Plug-Flow detention time=
(not calculated: outflow precedes inflow)
Center-of-Mass det. time=
167.1 min ( 918.4 - 751.2 )
Volume
Invert
Avail.Storage
Storage Description
#1
1,641.00'
30,420 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
#2
1,639.00'
568 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
1,720 cf Overall
x 33.0% Voids
30,988 cf
Total Available Storage
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,641.00
860
0
0
1,642.00
1,690
1,275
1,275
1,643.00
2,600
2,145
3,420
1,644.00
3,590
3,095
6,515
1,645.00
4,650
4,120
10,635
1,646.00
7,460
6,055
16,690
1,647.00
20,000
13,730
30,420
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,639.00
860
0
0
1,641.00
860
1,720
1,720
Device
Routing
Invert
Outlet Devices
#1
Primary
1,644.60'
10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head
(feet)
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
2.00
2.50
3.00
Coef.
(English)
2.69
2.72
2.75
2.85
2.98
3.08
3.20
3.28
3.31
3.30
3.31
3.32
#2
Discarded
1,639.00'
3.600 in/hr Exfiltration over Surface area
Discarded OutFlow
Max=0.33 cfs
@ 12.99 hrs
HW=1,643.52'
(Free Discharge)
2=Exfiltration
(Exfiltration Controls 0.33 cfs)
Primary OutFlow
Max=0.00 cfs
@ 0.00 hrs
HW=1,639.00'
TW=0.00'
(Dynamic Tailwater)
1=Broad-Crested Rectangular Weir
( Controls 0.00 cfs)
MSE 24-hr 4 10-Year Rainfall=3.79"
26-0159 south
Printed 7/1/2026
Prepared by Vreeland Associates
Page 25
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Pond P5:
Inflow
Outflow
Discarded
Primary
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
4
3
2
1
0
Inflow Area=0.975 ac
Peak Elev=1,643.52'
Storage=5,464 cf
4.14 cfs
0.33 cfs
0.33 cfs
0.00 cfs
MSE 24-hr 4 10-Year Rainfall=3.79"
26-0159 south
Printed 7/1/2026
Prepared by Vreeland Associates
Page 26
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Link 2L: offsite runoff
Inflow Area =
2.710 ac
,
75.87%
Impervious
, Inflow Depth =
0.00"
for 10-Year event
Inflow
=
0.00 cfs
@
18.40 hrs
, Volume=
0.000 af
Primary
=
0.00 cfs
@
18.40 hrs
, Volume=
0.000 af
, Atten= 0%
, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Link 2L: offsite runoff
Inflow
Primary
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
0.001
0.001
0.001
0.001
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0
0
0
Inflow Area=2.710 ac
0.00 cfs
0.00 cfs
MSE 24-hr 4 10-Year Rainfall=3.79"
26-0159 south
Printed 7/1/2026
Prepared by Vreeland Associates
Page 27
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Link 4L: north
Inflow Area =
1.555 ac
,
76.27%
Impervious
, Inflow Depth =
0.00"
for 10-Year event
Inflow
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
Primary
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
, Atten= 0%
, Lag= 0.0 min
Routed to Link 2L : offsite runoff
Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
10-Year Inflow Imported from 26-0159 north~Link 1L.hce
Link 4L: north
Inflow
Primary
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
1
0
Inflow Area=1.555 ac
10-Year Inflow
Imported from
26-0159 north~Link 1L.hce
Area= 1.555 ac
76.27% Imperv.
0.00 cfs
0.00 cfs
MSE 24-hr 4 100-Year Rainfall=6.43"
26-0159 south
Printed 7/1/2026
Prepared by Vreeland Associates
Page 28
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Time span=0.00-40.00 hrs, dt=0.05 hrs, 801 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Runoff Area=0.180 ac 0.00% Impervious Runoff Depth=0.58"
Subcatchment
1S:
Runoff
Tc=10.0 min CN=39 Runoff=0.06 cfs 0.009 af
Runoff Area=0.975 ac 89.23% Impervious Runoff Depth=5.59"
Subcatchment
D5:
D5
Tc=6.0 min CN=WQ Runoff=7.09 cfs 0.454 af
Runoff Area=2.710 ac 0.00% Impervious Runoff Depth=0.58"
Subcatchment
E1:
existing
Tc=10.0 min CN=39 Runoff=0.95 cfs 0.130 af
Peak Elev=1,644.67' Storage=9,745 cf Inflow=7.09 cfs 0.454 af
Pond
P5:
Discarded=0.43 cfs 0.431 af Primary=0.56 cfs 0.023 af Outflow=0.99 cfs 0.454 af
Inflow=0.60 cfs 0.032 af
Link
2L:
offsite
runoff
Primary=0.60 cfs 0.032 af
100-Year Inflow Imported from 26-0159 north~Link 1L.hce Inflow=0.00 cfs 0.000 af
Link
4L:
north
Area= 1.555 ac 76.27% Imperv. Primary=0.00 cfs 0.000 af
Total Runoff Area = 3.865 ac Runoff Volume = 0.593 af Average Runoff Depth = 1.84"
77.49% Pervious = 2.995 ac 22.51% Impervious = 0.870 ac
MSE 24-hr 4 100-Year Rainfall=6.43"
26-0159 south
Printed 7/1/2026
Prepared by Vreeland Associates
Page 29
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment 1S: Runoff
Runoff
=
0.06 cfs
@
12.26 hrs
, Volume=
0.009 af
, Depth=
0.58"
Routed to Link 2L : offsite runoff
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 100-Year Rainfall=6.43"
Area (ac)
CN
Description
0.180
39
>75% Grass cover, Good, HSG A
0.180
100.00% Pervious Area
Tc
Length
Slope
Velocity
Capacity
Description
(min)
(feet)
(ft/ft)
(ft/sec)
(cfs)
10.0
Direct Entry, min
Subcatchment 1S: Runoff
Runoff
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
0.07
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
MSE 24-hr 4
100-Year Rainfall=6.43"
Runoff Area=0.180 ac
Runoff Volume=0.009 af
Runoff Depth=0.58"
Tc=10.0 min
CN=39
0.06 cfs
MSE 24-hr 4 100-Year Rainfall=6.43"
26-0159 south
Printed 7/1/2026
Prepared by Vreeland Associates
Page 30
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment D5: D5
Runoff
=
7.09 cfs
@
12.13 hrs
, Volume=
0.454 af
, Depth=
5.59"
Routed to Pond P5 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 100-Year Rainfall=6.43"
Area (ac)
CN
Description
*
0.331
98
pavement
*
0.513
98
building
*
0.026
98
basin
0.105
39
>75% Grass cover, Good, HSG A
0.975
Weighted Average
0.105
10.77% Pervious Area
0.870
89.23% Impervious Area
Tc
Length
Slope
Velocity
Capacity
Description
(min)
(feet)
(ft/ft)
(ft/sec)
(cfs)
6.0
Direct Entry,
Subcatchment D5: D5
Runoff
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
7
6
5
4
3
2
1
0
MSE 24-hr 4
100-Year Rainfall=6.43"
Runoff Area=0.975 ac
Runoff Volume=0.454 af
Runoff Depth=5.59"
Tc=6.0 min
CN=WQ
7.09 cfs
MSE 24-hr 4 100-Year Rainfall=6.43"
26-0159 south
Printed 7/1/2026
Prepared by Vreeland Associates
Page 31
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Subcatchment E1: existing
Runoff
=
0.95 cfs
@
12.26 hrs
, Volume=
0.130 af
, Depth=
0.58"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 100-Year Rainfall=6.43"
Area (ac)
CN
Description
2.710
39
>75% Grass cover, Good, HSG A
2.710
100.00% Pervious Area
Tc
Length
Slope
Velocity
Capacity
Description
(min)
(feet)
(ft/ft)
(ft/sec)
(cfs)
10.0
Direct Entry,
Subcatchment E1: existing
Runoff
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
1
0
MSE 24-hr 4
100-Year Rainfall=6.43"
Runoff Area=2.710 ac
Runoff Volume=0.130 af
Runoff Depth=0.58"
Tc=10.0 min
CN=39
0.95 cfs
MSE 24-hr 4 100-Year Rainfall=6.43"
26-0159 south
Printed 7/1/2026
Prepared by Vreeland Associates
Page 32
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Pond P5:
Inflow Area =
0.975 ac
,
89.23%
Impervious
, Inflow Depth =
5.59"
for 100-Year event
Inflow
=
7.09 cfs
@
12.13 hrs
, Volume=
0.454 af
Outflow
=
0.99 cfs
@
12.55 hrs
, Volume=
0.454 af
, Atten= 86%
, Lag= 25.7 min
Discarded
=
0.43 cfs
@
12.55 hrs
, Volume=
0.431 af
Primary
=
0.56 cfs
@
12.55 hrs
, Volume=
0.023 af
Routed to Link 2L : offsite runoff
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,644.67'
@ 12.55 hrs
Surf.Area= 5,165 sf
Storage= 9,745 cf
Plug-Flow detention time=
225.6 min calculated for 0.453 af (100% of inflow)
Center-of-Mass det. time=
225.6 min ( 970.5 - 744.9 )
Volume
Invert
Avail.Storage
Storage Description
#1
1,641.00'
30,420 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
#2
1,639.00'
568 cf
Custom Stage Data (Prismatic)
Listed below
(Recalc)
1,720 cf Overall
x 33.0% Voids
30,988 cf
Total Available Storage
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,641.00
860
0
0
1,642.00
1,690
1,275
1,275
1,643.00
2,600
2,145
3,420
1,644.00
3,590
3,095
6,515
1,645.00
4,650
4,120
10,635
1,646.00
7,460
6,055
16,690
1,647.00
20,000
13,730
30,420
Elevation
Surf.Area
Inc.Store
Cum.Store
(feet)
(sq-ft)
(cubic-feet)
(cubic-feet)
1,639.00
860
0
0
1,641.00
860
1,720
1,720
Device
Routing
Invert
Outlet Devices
#1
Primary
1,644.60'
10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head
(feet)
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
2.00
2.50
3.00
Coef.
(English)
2.69
2.72
2.75
2.85
2.98
3.08
3.20
3.28
3.31
3.30
3.31
3.32
#2
Discarded
1,639.00'
3.600 in/hr Exfiltration over Surface area
Discarded OutFlow
Max=0.43 cfs
@ 12.55 hrs
HW=1,644.67'
(Free Discharge)
2=Exfiltration
(Exfiltration Controls 0.43 cfs)
Primary OutFlow
Max=0.56 cfs
@ 12.55 hrs
HW=1,644.67'
TW=0.00'
(Dynamic Tailwater)
1=Broad-Crested Rectangular Weir
(Weir Controls 0.56 cfs @ 0.73 fps)
MSE 24-hr 4 100-Year Rainfall=6.43"
26-0159 south
Printed 7/1/2026
Prepared by Vreeland Associates
Page 33
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Pond P5:
Inflow
Outflow
Discarded
Primary
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
7
6
5
4
3
2
1
0
Inflow Area=0.975 ac
Peak Elev=1,644.67'
Storage=9,745 cf
7.09 cfs
0.99 cfs
0.43 cfs
0.56 cfs
MSE 24-hr 4 100-Year Rainfall=6.43"
26-0159 south
Printed 7/1/2026
Prepared by Vreeland Associates
Page 34
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Link 2L: offsite runoff
Inflow Area =
2.710 ac
,
75.87%
Impervious
, Inflow Depth =
0.14"
for 100-Year event
Inflow
=
0.60 cfs
@
12.55 hrs
, Volume=
0.032 af
Primary
=
0.60 cfs
@
12.55 hrs
, Volume=
0.032 af
, Atten= 0%
, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Link 2L: offsite runoff
Inflow
Primary
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
0.65
0.6
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
Inflow Area=2.710 ac
0.60 cfs
0.60 cfs
MSE 24-hr 4 100-Year Rainfall=6.43"
26-0159 south
Printed 7/1/2026
Prepared by Vreeland Associates
Page 35
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Summary for Link 4L: north
Inflow Area =
1.555 ac
,
76.27%
Impervious
, Inflow Depth =
0.00"
for 100-Year event
Inflow
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
Primary
=
0.00 cfs
@
0.00 hrs
, Volume=
0.000 af
, Atten= 0%
, Lag= 0.0 min
Routed to Link 2L : offsite runoff
Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
100-Year Inflow Imported from 26-0159 north~Link 1L.hce
Link 4L: north
Inflow
Primary
Hydrograph
Time (hours)
40
39
38
37
36
35
34
33
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
Flow (cfs)
1
0
Inflow Area=1.555 ac
100-Year Inflow
Imported from
26-0159 north~Link 1L.hce
Area= 1.555 ac
76.27% Imperv.
0.00 cfs
0.00 cfs
Table of Contents
26-0159 south
Printed 7/1/2026
Prepared by Vreeland Associates
HydroCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
TABLE OF CONTENTS
Project Reports
1 Routing Diagram
2 Rainfall Events Listing
3 Area Listing (all nodes)
1-Year Event
4 Node Listing
5 Subcat 1S: Runoff
6 Subcat D5: D5
7 Subcat E1: existing
8 Pond P5:
10 Link 2L: offsite runoff
11 Link 4L: north
2-Year Event
12 Node Listing
13 Subcat 1S: Runoff
14 Subcat D5: D5
15 Subcat E1: existing
16 Pond P5:
18 Link 2L: offsite runoff
19 Link 4L: north
10-Year Event
20 Node Listing
21 Subcat 1S: Runoff
22 Subcat D5: D5
23 Subcat E1: existing
24 Pond P5:
26 Link 2L: offsite runoff
27 Link 4L: north
100-Year Event
28 Node Listing
29 Subcat 1S: Runoff
30 Subcat D5: D5
31 Subcat E1: existing
32 Pond P5:
34 Link 2L: offsite runoff
35 Link 4L: north
APPENDIX D
Proposed
Infiltration and WinSLAMM Calculations
Data file name: \\VREELAND-SERVER\Data\Vital\Cad Files\2026\26-0159 Barnes - UHaul Eagle
River\26-0159 winslamm.mdb
WinSLAMM Version 10.5.0
Rain file name: C:\WinSLAMM Files\Rain Files\WisReg - Green Bay WI 1969.RAN
Particulate Solids Concentration file name: C:\WinSLAMM Files\v10.1 WI_AVG01.pscx
Runoff Coefficient file name: C:\WinSLAMM Files\WI_SL06 Dec06.rsvx
Residential Street Delivery file name: C:\WinSLAMM Files\WI_Res and Other Urban Dec06.std
Institutional Street Delivery file name: C:\WinSLAMM Files\WI_Res and Other Urban
Dec06.std
Commercial Street Delivery file name: C:\WinSLAMM Files\WI_Res and Other Urban Dec06.std
Industrial Street Delivery file name: C:\WinSLAMM Files\WI_Res and Other Urban Dec06.std
Other Urban Street Delivery file name: C:\WinSLAMM Files\WI_Res and Other Urban Dec06.std
Freeway Street Delivery file name: C:\WinSLAMM Files\WI_Res and Other Urban Dec06.std
Apply Street Delivery Files to Adjust the After Event Load Street Dirt Mass Balance:
False
Pollutant Relative Concentration file name: C:\WinSLAMM Files\WI_GEO03.ppdx
Source Area PSD and Peak to Average Flow Ratio File: C:\WinSLAMM Files\NURP Source Area
PSD Files.csv
Cost Data file name:
Seed for random number generator: -42
Study period starting date: 01/02/69 Study period ending date: 12/28/69
Start of Winter Season: 11/25 End of Winter Season: 03/29
Date: 07-01-2026 Time: 09:50:54
Site information:
Pre-Development Area Description Pre-Development Area (ac) Pre-Development CN
GRASS 2.710 39
Total Area (ac)/Composite CN 2.710 39
LU# 1 - Commercial: D1 Total area (ac): 0.421
1 - Roofs 1: 0.268 ac. Pitched Connected Source Area PSD File: C:\WinSLAMM
Files\NURP.cpz
13 - Paved Parking 1: 0.110 ac. Connected Source Area PSD File: C:\WinSLAMM
Files\NURP.cpz
51 - Small Landscaped Areas 1: 0.042 ac. Normal Sandy Source Area PSD File:
C:\WinSLAMM Files\NURP.cpz
70 - Water Body Areas: 0.001 ac. Source Area PSD File:
LU# 2 - Commercial: D2 Total area (ac): 0.934
1 - Roofs 1: 0.333 ac. Pitched Connected Source Area PSD File: C:\WinSLAMM
Files\NURP.cpz
13 - Paved Parking 1: 0.387 ac. Connected Source Area PSD File: C:\WinSLAMM
Files\NURP.cpz
51 - Small Landscaped Areas 1: 0.200 ac. Normal Sandy Source Area PSD File:
C:\WinSLAMM Files\NURP.cpz
70 - Water Body Areas: 0.014 ac. Source Area PSD File:
LU# 3 - Commercial: D3 Total area (ac): 0.081
1 - Roofs 1: 0.021 ac. Pitched Connected Source Area PSD File: C:\WinSLAMM
Files\NURP.cpz
13 - Paved Parking 1: 0.007 ac. Connected Source Area PSD File: C:\WinSLAMM
Files\NURP.cpz
51 - Small Landscaped Areas 1: 0.049 ac. Normal Sandy Source Area PSD File:
C:\WinSLAMM Files\NURP.cpz
70 - Water Body Areas: 0.004 ac. Source Area PSD File:
LU# 4 - Commercial: D4 Total area (ac): 0.119
1 - Roofs 1: 0.034 ac. Pitched Connected Source Area PSD File: C:\WinSLAMM
Files\NURP.cpz
51 - Small Landscaped Areas 1: 0.078 ac. Normal Sandy Source Area PSD File:
C:\WinSLAMM Files\NURP.cpz
70 - Water Body Areas: 0.007 ac. Source Area PSD File:
LU# 5 - Commercial: D5 Total area (ac): 0.975
1 - Roofs 1: 0.513 ac. Pitched Connected Source Area PSD File: C:\WinSLAMM
Files\NURP.cpz
13 - Paved Parking 1: 0.331 ac. Connected Source Area PSD File: C:\WinSLAMM
Files\NURP.cpz
51 - Small Landscaped Areas 1: 0.105 ac. Normal Sandy Source Area PSD File:
C:\WinSLAMM Files\NURP.cpz
70 - Water Body Areas: 0.026 ac. Source Area PSD File:
LU# 6 - Commercial: 1S Total area (ac): 0.180
51 - Small Landscaped Areas 1: 0.180 ac. Normal Sandy Source Area PSD File:
C:\WinSLAMM Files\NURP.cpz
Control Practice 1: Biofilter CP# 1 (DS) - P1
1. Top area (square feet) = 810
2. Bottom aea (square feet) = 150
3. Depth (ft): 5
4. Biofilter width (ft) - for Cost Purposes Only: 10
5. Infiltration rate (in/hr) = 3.6
6. Random infiltration rate generation? No
7. Infiltration rate fraction (side): 0.001
8. Infiltration rate fraction (bottom): 1
9. Depth of biofilter that is rock filled (ft) 0
10. Porosity of rock filled volume = 0
11. Engineered soil infiltration rate: 3.6
12. Engineered soil depth (ft) = 2
13. Engineered soil porosity = 0.27
14. Percent solids reduction due to flow through engineered soil = 80
15. Biofilter peak to average flow ratio = 3.8
16. Number of biofiltration control devices = 1
17. Particle size distribution file: Not needed - calculated by program
18. Initial water surface elevation (ft): 0
Soil Data Soil Type Fraction in Eng. Soil
User-Defined Media Type 1.000
Biofilter Outlet/Discharge Characteristics:
Outlet type: Broad Crested Weir
1. Weir crest length (ft): 5
2. Weir crest width (ft): 5
3. Height of datum to bottom of weir opening: 4.7
Outlet type: Surface Discharge Pipe
1. Surface discharge pipe outlet diameter (ft): 1
2. Pipe invert elevation above datum (ft): 2.15
3. Number of surface pipe outlets: 1
Control Practice 2: Biofilter CP# 2 (DS) - P2
1. Top area (square feet) = 5260
2. Bottom aea (square feet) = 500
3. Depth (ft): 6
4. Biofilter width (ft) - for Cost Purposes Only: 10
5. Infiltration rate (in/hr) = 3.6
6. Random infiltration rate generation? No
7. Infiltration rate fraction (side): 0.001
8. Infiltration rate fraction (bottom): 1
9. Depth of biofilter that is rock filled (ft) 0
10. Porosity of rock filled volume = 0
11. Engineered soil infiltration rate: 3.6
12. Engineered soil depth (ft) = 2
13. Engineered soil porosity = 0.27
14. Percent solids reduction due to flow through engineered soil = 80
15. Biofilter peak to average flow ratio = 3.8
16. Number of biofiltration control devices = 1
17. Particle size distribution file: Not needed - calculated by program
18. Initial water surface elevation (ft): 0
Soil Data Soil Type Fraction in Eng. Soil
User-Defined Media Type 1.000
Biofilter Outlet/Discharge Characteristics:
Outlet type: Broad Crested Weir
1. Weir crest length (ft): 10
2. Weir crest width (ft): 5
3. Height of datum to bottom of weir opening: 5.79
Outlet type: Surface Discharge Pipe
1. Surface discharge pipe outlet diameter (ft): 1
2. Pipe invert elevation above datum (ft): 4.15
3. Number of surface pipe outlets: 1
Control Practice 3: Biofilter CP# 3 (DS) - P3
1. Top area (square feet) = 10000
2. Bottom aea (square feet) = 150
3. Depth (ft): 5
4. Biofilter width (ft) - for Cost Purposes Only: 10
5. Infiltration rate (in/hr) = 3.6
6. Random infiltration rate generation? No
7. Infiltration rate fraction (side): 0.001
8. Infiltration rate fraction (bottom): 1
9. Depth of biofilter that is rock filled (ft) 0
10. Porosity of rock filled volume = 0
11. Engineered soil infiltration rate: 3.6
12. Engineered soil depth (ft) = 2
13. Engineered soil porosity = 0.27
14. Percent solids reduction due to flow through engineered soil = 80
15. Biofilter peak to average flow ratio = 3.8
16. Number of biofiltration control devices = 1
17. Particle size distribution file: Not needed - calculated by program
18. Initial water surface elevation (ft): 0
Soil Data Soil Type Fraction in Eng. Soil
User-Defined Media Type 1.000
Biofilter Outlet/Discharge Characteristics:
Outlet type: Broad Crested Weir
1. Weir crest length (ft): 10
2. Weir crest width (ft): 4
3. Height of datum to bottom of weir opening: 3
Control Practice 4: Biofilter CP# 4 (DS) - P4
1. Top area (square feet) = 10000
2. Bottom aea (square feet) = 270
3. Depth (ft): 5
4. Biofilter width (ft) - for Cost Purposes Only: 10
5. Infiltration rate (in/hr) = 3.6
6. Random infiltration rate generation? No
7. Infiltration rate fraction (side): 0.001
8. Infiltration rate fraction (bottom): 1
9. Depth of biofilter that is rock filled (ft) 0
10. Porosity of rock filled volume = 0
11. Engineered soil infiltration rate: 3.6
12. Engineered soil depth (ft) = 2
13. Engineered soil porosity = 0.27
14. Percent solids reduction due to flow through engineered soil = 80
15. Biofilter peak to average flow ratio = 3.8
16. Number of biofiltration control devices = 1
17. Particle size distribution file: Not needed - calculated by program
18. Initial water surface elevation (ft): 0
Soil Data Soil Type Fraction in Eng. Soil
User-Defined Media Type 1.000
Biofilter Outlet/Discharge Characteristics:
Outlet type: Broad Crested Weir
1. Weir crest length (ft): 10
2. Weir crest width (ft): 4
3. Height of datum to bottom of weir opening: 4
Outlet type: Surface Discharge Pipe
1. Surface discharge pipe outlet diameter (ft): 1
2. Pipe invert elevation above datum (ft): 3.63
3. Number of surface pipe outlets: 1
Control Practice 5: Biofilter CP# 5 (DS) - P5
1. Top area (square feet) = 7460
2. Bottom aea (square feet) = 860
3. Depth (ft): 7
4. Biofilter width (ft) - for Cost Purposes Only: 10
5. Infiltration rate (in/hr) = 3.6
6. Random infiltration rate generation? No
7. Infiltration rate fraction (side): 0.001
8. Infiltration rate fraction (bottom): 1
9. Depth of biofilter that is rock filled (ft) 0
10. Porosity of rock filled volume = 0
11. Engineered soil infiltration rate: 3.6
12. Engineered soil depth (ft) = 2
13. Engineered soil porosity = 0.27
14. Percent solids reduction due to flow through engineered soil = 80
15. Biofilter peak to average flow ratio = 3.8
16. Number of biofiltration control devices = 1
17. Particle size distribution file: Not needed - calculated by program
18. Initial water surface elevation (ft): 0
Soil Data Soil Type Fraction in Eng. Soil
User-Defined Media Type 1.000
Biofilter Outlet/Discharge Characteristics:
Outlet type: Broad Crested Weir
1. Weir crest length (ft): 10
2. Weir crest width (ft): 4
3. Height of datum to bottom of weir opening: 5.6
SLAMM for Windows Version 10.5.0
(c) Copyright Robert Pitt and John Voorhees 2019, All Rights Reserved
Data file name: \\VREELAND-SERVER\Data\Vital\Cad Files\2026\26-0159 Barnes - UHaul Eagle River\26-0159 winslamm.mdb
Data file description:
Rain file name: C:\WinSLAMM Files\Rain Files\WisReg - Green Bay WI 1969.RAN
Particulate Solids Concentration file name: C:\WinSLAMM Files\v10.1 WI_AVG01.pscx
Runoff Coefficient file name: C:\WinSLAMM Files\WI_SL06 Dec06.rsvx
Pollutant Relative Concentration file name: C:\WinSLAMM Files\WI_GEO03.ppdx
Residential Street Delivery file name: C:\WinSLAMM Files\WI_Res and Other Urban Dec06.std
Institutional Street Delivery file name: C:\WinSLAMM Files\WI_Res and Other Urban Dec06.std
Commercial Street Delivery file name: C:\WinSLAMM Files\WI_Res and Other Urban Dec06.std
Industrial Street Delivery file name: C:\WinSLAMM Files\WI_Res and Other Urban Dec06.std
Other Urban Street Delivery file name: C:\WinSLAMM Files\WI_Res and Other Urban Dec06.std
Freeway Street Delivery file name: C:\WinSLAMM Files\WI_Res and Other Urban Dec06.std
Apply Street Delivery Files to Adjust the After Event Load Street Dirt Mass Balance: False
Source Area PSD and Peak to Average Flow Ratio File: C:\WinSLAMM Files\NURP Source Area PSD Files.csv
Cost Data file name:
Seed for random number generator: -42
Start of Winter Season: 11/25 End of Winter Season: 03/29
Model Run Start Date: 01/02/69 Model Run End Date: 12/28/69
Date of run: 07-01-2026 Time of run: 09:50:32
Total Area Modeled (acres): 2.710
Years in Model Run: 0.99
Runoff Percent Particulate Particulate Percent
Volume Runoff Solids Solids Particulate
(cu ft) Volume Conc. Yield Solids
Reduction (mg/L) (lbs) Reduction
Total of all Land Uses without Controls: 139829 - 65.90 575.2 -
Outfall Total with Controls: 127.4 99.91% 227.0 1.806 99.69%
Annualized Total After Outfall Controls: 129.2 1.831
U-Haul Eagle River
Location:
Inflow Area:
118,048
sf
Rainfall Total:
22.63
in
Total Volume=
Inflow Area x Rainfall Total
Total Volume:
222,618
cf
Volume Leaving Site:
0
Existing Infiltration Volume
= Total Volume-Volume Leaving Site
Existing Infiltration Volume:
222,618
cf
Proposed Infiltration Volume:
Inflow Area:
118,048
sf
Total Rainfall Infiltrated:
22.63
in
Total Volume=
Inflow Area x Rainfall Total
Total Potential Volume Runoff:
222,618
cf
Outfall Total (from WinSLAMM):
127
cf
Proposed Infiltration Volume
222,491
cf
Percent of Pre-development Infiltration Volume Infiltrated:
Infiltration Percent
= Proposed Infiltration Volume/Existing Infiltration Volume
Infiltration Percent:
99.94%
Date:
5/28/2026
City of Eagle River
Existing Infiltration Volume:
Infiltration Volumes
Calculated by: Dustin Vreeland
APPENDIX
E
Soil Loss and Sediment Discharge Map and Calculations
YEAR 1
Developer:
Project:
Date:
County:
Version 2.1
Activity
(1)
Begin
Date
(2)
End Date
(3)
Period
% R
(4)
Annual R
Factor (5)
Sub Soil Texture
(6)
Soil
Erodibility K
Factor (7)
Slope
(%)
(8)
Slope
Length
(ft)
(9)
LS
Factor
(10)
Land Cover
C Factor
(11)
Soil loss A
(tons/acre)
(12)
SDF
(13)
Sediment Control
Practice
(14)
Sediment
Discharge
(t/ac) (15)
07/01/26
04/01/27
64.2%
100
0.15
1.2%
195
0.17
1.00
1.7
0.924
0.9
04/01/27
06/01/27
16.4%
100
Sand
0.15
1.2%
195
0.17
0.10
0.0
0.924
0.0
06/01/27
-----
-----
-----
-------
-----
1.2%
195
0.17
------
-----
0.000
0.0
-----
-----
-----
-------
-----
1.2%
195
0.17
-----
-----
0.000
0.0
-----
-----
-----
-------
-----
1.2%
0
-----
-----
-----
0.000
0.0
-----
-----
-----
-------
-----
0.0%
0
-----
-----
-----
0.000
0.0
TOTAL
1.7
TOTAL
1.0
Notes:
% Reduction
Required
NONE
See Help Page for further descriptions of variables and items in drop-down boxes.
The last land disturbing activity on each sheet must be 'End'. This is either 12 months from the start of construction or final stabilization.
For periods of construction that exceed 12 months, please demonstrate that 5 tons/acre/year is not exceeded in any given 12 month period.
Recommended Permanent Seeding Dates:
4/15-6/1
and
8/1-8/21
Turf, introduced grasses and legumes
Designed By:
Dustin Vreeland
Thaw-6/30
Native Grasses, forbs, and legumes
Date
5/28/2026
NOTE: THIS TOOL ONLY ADDRESSED SOIL EROSION DUE TO
SHEET FLOW. MEASURES TO CONTROL CHANNEL EROSION MAY
ALSO BE REQUIRED TO MEET SEDIMENT DISCHARGE
REQUIREMENTS.
Soil Loss & Sediment Discharge Calculation Tool
for use on Construction Sites in the State of Wisconsin
05/28/26
WDNR Version 2.1 (12-05-2024)
U-Haul
U-Haul Eagle River
Bare Ground
Seed with Mulch or Ero
End
Sand
Vilas
Silt Fence
Silt Fence
C:\Users\sadmin\Desktop\USLEmodel.xlsm
APPENDIX
F
State of Wisconsin Construction Site Inspection Report
l 2 If the project is not on schedule then the soil loss summary for the project should be reviewed and schedule, plan or practices modified accordingly.
CONSTRUCTION SITE INSPECTION REPORTForm 3400-187 (R 11/16)Page 1 of 2State of Wisconsin Department of Natural Resources (DNR) PO Box 7921, Madison WI 53707-7921 dnr.wi.govNotice: This form was developed in accordance with s. NR 216.48 Wis. Adm. Code for WPDES permittees’ convenience; however, use of this specific form is voluntary. Multiple copies of this form may be made to compile the inspection report. Inspections of the construction site and implemented erosion and sediment control best management practices (BMPs) must be performed weekly and within 24 hours after a rainfall event 0.5 inches or greater.Construction Site Name and Location (Project, Municipality, and County):Onsite Contact/Contractor:Site/Facility ID No. (FIN):Onsite Phone/Cell:Note: Inspection reports, along with erosion control and storm water management plans, are required to be maintained on site in accordance with s. NR 216.48 (4) and made available upon request. PLEASE PRINT LEGIBLY.Date of inspection:Time of inspection:Start:ampmEnd:ampmType of inspection: WeeklyPrecipitation EventOther (specify)Weather/Site Conditions: Antecedent Soil Moisture Last Rainfall Depth: Temp.inchesLast Rainfall Date:°F DryVariableWetFrozen or snow coveredMelting Snow/slushDescribe current phase of construction: Project on Schedule2?YesNoScheduled Final Stabilization Date for Universal Soil Loss Equation (USLE) 1 :Name(s) of individual(s) performing inspection:Inspector Phone/Cell:I certify that the information contained on this form is an accurate assessment of site conditions at the time of inspection:Inspector SignatureDate: Inspection Questions:YesNo (Identify Actions Required):Location/Comments:Actions Completed by Date & Initials1.Is the erosion control plan accessible to operators?Provide onsite copy2.Is the permit certificate posted where visible?Post certificate3.Is the current phase of construction on sequence with the site-specific erosion and sediment control plan, including installation/stabilization of ponds and ditches?Add sediment controlInstall missing ditch/pipe/pondStabilize bare soil4.Are all erosion and sediment control BMPs shown on plan properly installed and in functional condition?RepairModifyInstall/Replace5. Is inlet protection properly installed and functioning in all inlets likely to receive runoff from the site?CleanReplaceInstall6. Is the air free of fugitive dust resulting from construction activity and bare soil exposure?Apply waterApply dust control product
CONSTRUCTION SITE INSPECTION REPORTForm 3400-187 (R 11/16)State of Wisconsin Department of Natural Resources dnr.wi.gov
4
Page 2 of 2 Inspection Questions:YesNo (Identify Actions Required):Location/Comments:Actions Completed by Date & Initials7.Is the public right of way curb line free of tracked soil and accumulation?Install tracking padWiden/lengthen padAmend stone/Add geotextileInstall wheel washing stationClose entrance/exitLimit traffic across disturbed areasSweep road and curb line8.Are wetlands, lakes, streams, ditches, or storm sewers downstream of the site free of sedimentation and turbid water leaving the site?3Add sediment controlsModify operationsContact DNR to verify extent of cleanup required9.Is dewatering and/or vehicle and equipment washing being done in a manner that prevents erosion and sediment discharge?Install treatment trainInstall energy dissipationModify discharge locationModify intake to reduce sediment10.Are soil stockpiles existing for more than 7 days covered and stabilized?SeedInstall mat/mulch/polymerCover with tarp/plastic sheeting11.Are downstream channels and other downhill areas protected from scour and erosion?Install energy dissipation at outfallInstall ditch checksInstall slope interruptionInstall onsite detention12.Are good housekeeping practices or treatment controls in place to prevent the discharge of chemicals, cement, trash, and other materials into wetlands, waterways, storm sewers, ditches, or drainage-ways?4Properly dispose of trashProvide concrete washout stationContact DNR to verify extent of cleanup required13.Is the plan reflective of current site operations and does it address all erosion and sediment control issues identified during the inspection?Revise sequenceRevise sediment control BMPRevise erosion control BMPRevise post-construction storm water BMP14.Are all areas where construction has temporarily ceased (and will not resume for more than 2 weeks) temporarily stabilized? Topsoil & seedInstall mat/mulch/polymerCover with tarp/plastic sheeting15.Are all areas at final grade permanently vegetated or stabilized with other treatments? Topsoil & seedInstall mat/mulch/polymerSod Install stone base16.Have temporary sediment controls been removed in areas of the site that meet the permit definition of ‘final stabilization’?Water to establish vegetationRepair or reseed areasRemove temporary practices
1
Robin Ginner
From: Vito S. Bortolotti <v.s.bortolotti@gmail.com>
Sent: Wednesday, July 1, 2026 11:23 AM
To: Robin Ginner
Subject: Fwd: Another round of Letters/ Emails for the July 2nd Meeting
---------- Forwarded message ---------
From: Ally Ramesh <ally@burkettrealty.com>
Date: Wed, Jul 1, 2026, 9:14 AM
Subject:
To: v.s.bortolotti@gmail.com <v.s.bortolotti@gmail.com>
Good afternoon Mr. Bortolotti,
It was very nice to meet you! Your family has a wonderful business.
My opinion is based solely on general real estate market
observations. I believe the proposed development can have a
negative impact on the restaurant's visibility from the highway, which
may affect customer exposure and traffic patterns. Reduced visibility
is generally considered a factor that can negatively influence the
marketability and potential resale value of a business. A qualified
business appraiser or valuation expert would be best suited to
quantify any impact.
--
Ally Ramesh 苧苨
REALTOR® | Century 21 Burkett & Associates
906-284-2918 | ally@burkettrealty.com
Serving All of Northern Wisconsin
JUNE 30, 2026
SUBJECT: STORAGE UNIT/CIN CIN PLANNING COMMISSION MEETING
To Whom It May Concern,
I am writing in my capacity as a licensed Wisconsin REALTOR® with experience
marketing commercial and residential properties throughout Northern Wisconsin.
This letter is not intended to express support for or opposition to the proposed
development or conditional use permit. Rather, I am offering a professional opinion
regarding how adjacent land uses can influence the marketability of neighboring
commercial properties.
The Cin Cin restaurant benefits from its visibility along US Highway 45 and the
ambiance it provides its patrons. From a real estate perspective, customer-facing
businesses often rely not only on location, but also on the surrounding environment and
overall dining experience. Should the proposed climate-controlled storage facility
substantially alter the existing views or visual setting, it is my opinion that it could
negatively affect the property's marketability and the ambiance that contributes to its
appeal for customers.
My comments are limited to general real estate principles regarding commercial
marketability and should not be interpreted as an opinion on the proposed project itself
or its approval.
Respectfully,
Drea Myszka
Wisconsin Licensed REALTOR®
Minocqua Eagle River Rhinelander Manitowish Waters
(800) 472-3410 (800) 282-1774 (800) 472-7334 (800) 433-9494
shorewest.com
An Independently Owned and Operated Member of Coldwell Banker Residential Affiliates, Inc.
June 29, 2026
Vito Bortolotti
1114 N. Bluebird
Eagle River, WI 54521
Cin Cin Value
Sir,
Some information regarding your property located at 1114 N. Bluebird Rd, Eagle River,
Wisconsin.
Assessed value is $210,500
Fair Market Value is $233,800
Most recent sale, 11/2016 $106,000
My estimate of value of the real estate, excluding the business is $290,000
Should a structure be built in front of the restaurant blocking visibility, my opinion of value
drops to $265,000.
I will be most happy to discuss.
Best regards,
James Mulleady
Shorewest Realtors
Legal Notice
Publish twice, beginning June 15, 2026. Affidavit requested.
NOTICE OF PUBLIC HEARING - Correction
CITY OF EAGLE RIVER PLANNING COMMISSION
The Vilas County Fair Board has submitted a Conditional Use Permit request to allow camping by circus
workers at the Vilas County Fairgrounds, July 13 -15, 2026. T he Vilas County Fairgrounds property,
Parcel 221-182, 133 South Forrest Street, is described as Sect. 32, T40N,R10E, MILL LOT 1 COUNTY
CLERK'S PLAT GOVT LOT 1 & PRT SE NE EXC 23-382,196-598,580174, 584885 RESOLUTION 441482.
The City of Eagle River Planning Commission has scheduled a public hearing for Thursday, July 2, 2026
at 5 pm, located in the Eagle River Common Council Chambers, 525 E. Maple Street, Eagle River, WI
54521.
Comments can be made in person at the public hearing or by mail to City Administrator, PO. Box 1269,
Eagle River, WI 54521; by phone (715) 479- 8682 x227 or email rcginner@eagleriverwi.gov .
Documents will be available for review at City Hall. PETITIONERS, OR THEIR REPRESENTATIVES, SHALL
BE PRESENT.
WEST PINE STREET LLC
2303 RIDGEVIEW DR
WAUSAU, WI 54401
WEST PINE STREET LLC
2303 RIDGEVIEW DR
WAUSAU, WI 54401
GPS II INC
PO BOX 997
EAGLE RIVER, WI 54521
EAGLE RIVER RE LLC
1209 TYLER ST NE
MINNEAPOLIS, MN 55413
BEAVERS LAND MANAGEMENT LLC
2220 6TH AVE N
ESCANABA, MI 49829
BTK GROUP LLC
4299 ISLANDVIEW RD
RHINELANDER, WI 54501
HODAG PROPERTY HOLDINGS LLC
7500 BIRCH TREE DR
EAGLE RIVER, WI 54521
THOMAS M POLLACK
PO BOX 186
EAGLE RIVER, WI 54521
KAP HOLDINGS LLC
PO BOX 939
EAGLE RIVER, WI 54521
THOMAS F WRANIK
PO BOX 1266
EAGLE RIVER, WI 54521
THOMAS F WRANIK
PO BOX 1266
EAGLE RIVER, WI 54521
VILAS COUNTY
330 COURT ST
EAGLE RIVER, WI 54521
KEVIN M KADLEC
PO B
OX 348
PORT CHARLOTTE, FL 33981
GERTA
PO Box 1714
EAGLE RIVER, WI 54521
VILAS COUNTY
330 COURT ST
EAGLE RIVER, WI 54521
STUART A LANDAU TRUST
5100 DORSET AVE CHEVY
CHASE, MD 20815
SAS INCOME TRUST
PO BOX 1015
EAGLE RIVER, WI 54521
DANIEL M BAKOTIC TRUST
503 NAVAJO DR
NEW LENOX, IL 60451
PATRICIA A LANGE
24 MEDALIST LN
ROTONDA WEST, FL 33947
MATTHEW J GUTHRIE 149
FIELDSTONE LN DIXON, IL
61021
ELLEN S MOMMAERTS
1740 DUBLIN LN APT 73
NEENAH, WI 54956
CHARLES BURGESS
604 CEDAR LN
PFLUGERVILLE, TX 78660
BRIAN T WIRTH
864 STONECROP DR
HARTFORD, WI 53027
JOHN R BURCZYK TRUST
741 RIVER EDGE
EAGLE RIVER, WI 54521
KATIE L RHEINSCHMIDT
741 E RIVER EDGE RD
EAGLE RIVER, WI 54521
KENT & PATRICIA KOHN TRUST
812 RIVER EDGE
EAGLE RIVER, WI 54521
EVELYN D ABBATE TRUST
812 RIVER EDGE
EAGLE RIVER, WI 54521
MATTHEW J BROWN
N3666 TOWER RD
TIGERTON, WI 54486
DONALD L PETERSON
16804 ENNERDALE AVE
LOCKPORT, IL 60441
Office of Administration 525 E. Maple Street, PO Box 1269, Eagle River, WI 54521 715-479-8682
https://eagleriverwi.gov/
NOTICE OF PUBLIC HEARING
CITY OF EAGLE RIVER PLANNING COMMISSION
The Vilas County Fair Board has submitted a request to allow camping by carnival workers at the Vilas
County Fairgrounds during the County Fair, August 13 -16, 2026, with additional shoulder dates as
required for set -up/tear-down of the fair attractions. T he Vilas County Fairgrounds property, Parcel
221-182, 133 South Forrest Street, is described as Sect. 32, T40N,R10E, MILL LOT 1 COUNTY CLERK'S
PLAT GOVT LOT 1 & PRT SE NE EXC 23-382,196-598,580174, 584885 RESOLUTION 441482.
The City of Eagle River Planning Commission has scheduled a public hearing for Thursday, July 2, 2026
at 5 pm, located in the Eagle River Common Council Chambers, 525 E. Maple Street, Eagle River, WI
54521.
Comments can be made in person at the public hearing or by mail to City Administrator, PO. Box 1269,
Eagle River, WI 54521; by phone (715) 479- 8682 x227 or email rcginner@eagleriverwi.gov .
Documents will be available for review at City Hall. PETITIONERS, OR THEIR REPRESENTATIVES, SHALL
BE PRESENT.
WEST PINE STREET LLC
2303 RIDGEVIEW DR
WAUSAU, WI 54401
WEST PINE STREET LLC
2303 RIDGEVIEW DR
WAUSAU, WI 54401
GPS II INC
PO BOX 997
EAGLE RIVER, WI 54521
GPS II INC
PO BOX 997
EAGLE RIVER, WI 54521
EAGLE RIVER RE LLC
1209 TYLER ST NE
MINNEAPOLIS, MN 55413
EAGLE RIVER RE LLC
1209 TYLER ST NE
MINNEAPOLIS, MN 55413
BEAVERS LAND MANAGEMENT LLC
2220 6TH AVE N
ESCANABA, MI 49829
BTK GROUP LLC
4299 ISLANDVIEW RD
RHINELANDER, WI 54501
HODAG PROPERTY HOLDINGS LLC
7500 BIRCH TREE DR
EAGLE RIVER, WI 54521
THOMAS M POLLACK
PO BOX 186
EAGLE RIVER, WI 54521
KAP HOLDINGS LLC
PO BOX 939
EAGLE RIVER, WI 54521
THOMAS F WRANIK
PO BOX 1266
EAGLE RIVER, WI 54521
THOMAS F WRANIK
PO BOX 1266
EAGLE RIVER, WI 54521
VILAS COUNTY
330 COURT ST
EAGLE RIVER, WI 54521
KEVIN M KADLEC
PO B
OX 348
PORT CHARLOTTE, FL 33981
GERTA
PO Box 1714
EAGLE RIVER, WI 54521
VILAS COUNTY
330 COURT ST
EAGLE RIVER, WI 54521
STUART A LANDAU TRUST
5100 DORSET AVE CHEVY
CHASE, MD 20815
SAS INCOME TRUST
PO BOX 1015
EAGLE RIVER, WI 54521
DANIEL M BAKOTIC TRUST
503 NAVAJO DR
NEW LENOX, IL 60451
PATRICIA A LANGE
24 MEDALIST LN
ROTONDA WEST, FL 33947
MATTHEW J GUTHRIE 149
FIELDSTONE LN DIXON, IL
61021
ELLEN S MOMMAERTS
1740 DUBLIN LN APT 73
NEENAH, WI 54956
CHARLES BURGESS
604 CEDAR LN
PFLUGERVILLE, TX 78660
BRIAN T WIRTH
864 STONECROP DR
HARTFORD, WI 53027
JOHN R BURCZYK TRUST
741 RIVER EDGE
EAGLE RIVER, WI 54521
KATIE L RHEINSCHMIDT
741 E RIVER EDGE RD
EAGLE RIVER, WI 54521
KENT & PATRICIA KOHN TRUST
812 RIVER EDGE
EAGLE RIVER, WI 54521
EVELYN D ABBATE TRUST
812 RIVER EDGE
EAGLE RIVER, WI 54521
MATTHEW J BROWN
N3666 TOWER RD
TIGERTON, WI 54486
DONALD L PETERSON
16804 ENNERDALE AVE
LOCKPORT, IL 60441
Office of Zoning & Administration 525 E. Maple Street, PO Box 1269, Eagle River, WI 54521 715-479-8682
https://eagleriverwi.gov/
City Of Eagle River
Resolution No. _________
A Resolution To Amend The City Of Eagle River Comprehensive Plan Future
Land Use Map And Rezone Certain Properties Located On Elm Drive From
Parks/Recreation To Office/Residential
WHEREAS, the City of Eagle River has received requests to amend the Future Land Use Map of the
Comprehensive Plan and to rezone certain properties located on Elm Drive; and
WHEREAS, the subject properties are currently designated and zoned as Parks/Recreation and are
proposed to be redesignated and rezoned to Office/Residential; and
WHEREAS, the properties affected by this amendment and rezoning are legally described in the City tax
roll and identified as follows:
1. Tuff Property
Parcel No. 221-1058-5801
1020 Elm Drive
SE-SE, Section 33, Township 40 North, Range 10 East, Part of SE-SE.
Full legal description on file in the tax roll.
2. Hom Property
Parcel No. 221-1058-6012
SE-SE, Section 33, Township 40 North, Range 10 East, Lot 3 of Certified Survey Map No. 5874,
recorded as 22CS212, Part of SE-SE.
Full legal description on file in the tax roll.
3. Buskager Property
Parcel No. 221-1058-6011
1025 Elm Drive
SE-SE, Section 33, Township 40 North, Range 10 East, Lot 2 of Certified Survey Map No. 5874,
recorded as 22CS212, formerly part of SE-SE, except Document No. 540834.
Full legal description on file in the tax roll.
WHEREAS, pursuant to Wisconsin Statutes and the City of Eagle River Zoning Ordinance, the Planning
Commission conducted a public hearing on July 2, 2026, at 5:00 p.m. in the Common Council Chambers
at City Hall, 525 East Maple Street, Eagle River, Wisconsin, to receive testimony and public comment
regarding the proposed Comprehensive Plan amendment and rezoning; and
Office of Zoning & Administration 525 E. Maple Street, PO Box 1269, Eagle River, WI 54521 715-479-8682
https://eagleriverwi.gov/
WHEREAS, after consideration of the public testimony, staff review, applicable ordinances, and the goals
and objectives of the City’s Comprehensive Plan, the Planning Commission has recommended approval
of the proposed amendments; and
WHEREAS, the Common Council finds that the proposed Future Land Use Map amendment and
rezoning are consistent with the public health, safety, and welfare of the community and are in the best
interests of the City of Eagle River.
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Eagle River, Wisconsin, that:
Section 1. The Future Land Use Map of the City of Eagle River Comprehensive Plan is hereby amended to
change the future land use designation of the properties identified above from Parks/Recreation to
Office/Residential.
Section 2. The Official Zoning Map of the City of Eagle River is hereby amended to rezone the properties
identified above from Parks/Recreation to Office/Residential.
Section 3. City staff are authorized and directed to make all necessary revisions to the Comprehensive
Plan, Official Zoning Map, and related City records to reflect these amendments.
Section 4. This Resolution shall take effect upon its adoption and publication as required by law.
Adopted by the Common Council of the City of Eagle River, Wisconsin, this ____ day of __________,
2026.
SIGNED:
Debra A Brown, Mayor Date
ATTEST:
Becky Bolte, Clerk Date
Office of Administration 525 E. Maple Street, PO Box 1269, Eagle River, WI 54521 715-479-8682
https://eagleriverwi.gov/
NOTICE OF PUBLIC HEARING
CITY OF EAGLE RIVER PLANNING COMMISSION
The Planning Commission will consider the rezoning, and the subsequent change to the
Comprehensive Plan of the City of Eagle River, for Elm Drive properties listed below from
Parks/Recreation to Office/Residential zoning classification. The properties are described as:
• Tuff: Parcel #221-1058-5801, 1020 Elm Drive, SE-SE,Sect. 33, T40N,R10E, PRT SE SE. Full
description in tax roll.
• Hom: Parcel #221-1058-6012, SE-SE,Sect. 33, T40N,R10E, LOT 3 22CS212 CSM 5874 PRT SE
SE. Full description in the tax roll.
• Buskager: Parcel #221-1058-6011, 1025 Elm Drive, SE-SE,Sect. 33, T40N,R10E, LOT 2
22CS212 CSM 5874 FKA PRT SE SE EXC 540834
The City of Eagle River Planning Commission has scheduled a public hearing for Thursday, July 2, 2026
at 5 pm, located in the Eagle River Common Council Chambers, 525 E. Maple Street, Eagle River, WI
54521.
Comments can be made in person at the public hearing or by mail to City Administrator, PO. Box 1269,
Eagle River, WI 54521; by phone (715) 479- 8682 x227 or email rcginner@eagleriverwi.gov .
Documents will be available for review at City Hall. PETITIONERS, OR THEIR REPRESENTATIVES, SHALL
BE PRESENT.
RORY TUFF
1020 ELM DR
EAGLE RIVER, WI 54521
CITY OF EAGLE RIVER
PO BOX 1269
EAGLE RIVER, WI 54521
SPENCER BUSKAGER
7828 PRIMEVAL LN
ST GERMAIN, WI 54558
KATIE HOM
1005 ELM DR
EAGLE RIVER, WI 54521
1
Robin Ginner
From: Rick Meadows <rick_meadows@msn.com>
Sent: Thursday, June 11, 2026 3:40 PM
To: Robin Ginner
Subject: Withdrawal of Real Estate Purchase Request
Members of the Eagle River Zoning Commission,
Please accept this email as formal notice that I am withdrawing my request to purchase the strip of land
adjacent to my mother's property (655 Bond Blvd) and will not be pursuing the matter further.
My parents, George and Carol Meadows, have been part of the Eagle River community for many years, and as
we prepare for the sale of the property and my mother's transition to assisted living, I have decided it is best
to move forward without further consideration of this request.
I appreciate the opportunity to present the matter and the professionalism shown by the Commission
throughout the process.
Thank you for your time.
Respectfully,
Rick Meadows
Attorney-in-Fact for Carol Meadows