7-2-26 Planning Commission FULL PACKET
City of Eagle River · Vilas County · meeting of Jul 2, 2026 · Agenda packets
Open the original document More from City of Eagle River
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Please note that, upon reasonable notice, at least 24 hours in advance, efforts will be made to accommodate the needs of
disabled individuals through appropriate aids and services or provide a video link for meetings. For additional information to
request this service, please contact the City Clerk's Office at 715-479-8682 ext. 224,
525 E. Maple Street, P.O. Box 1269, Eagle River WI 54521.
AGENDA NOTICE (6/24/2026)
THE PLANNING COMMISSION OF THE CITY OF EAGLE RIVER WILL HOLD A MEETING ON
THURSDAY, JULY 2, 2026, AT 5:00 P.M. AT CITY HALL, 525 E. MAPLE STREET IN EAGLE RIVER.
Notice is hereby given that a majority of the City Council of the City of Eagle River may be attending scheduled
Planning Commission meetings either in person or via zoom. This constitutes a meeting of the City Council
pursuant to State ex rel. Badke v. Greendale Village Bd., 173 Wis. 2d 553, 494 N.W.2d 409 (1993), and must be
noticed as such, although the Council will not take any formal action at these meetings.
This meeting will be available by Zoom at the following link:
https://us06web.zoom.us/j/85111695208?pwd=x5pMv8crrbsPuYwefObTYbJG0m83b3.1
Meeting ID: 851 1169 5208
Passcode: 963936
1) Call to Order.
2) Roll Call.
3) Approval of minutes.
4) Public Hearings, discussion and possible action on the following agenda item(s):
a) Conditional Use Permit Public Hearing - Continuation: Request by Amerco Real Estate Company/U-
Haul for a conditional use permit to construct two (2) self- storage units totaling 51,977 square
feet at 1100 N. Railroad Street, Eagle River, computer number 221 -1019-06, in accordance with
Chapter 106, Article VI, Division 7, Sec 106 -473 Uses permitted by conditi onal grant, (8) Storage
buildings not used for habitation – human or animal.
b) Conditional Use Permit Public Hearing: The Vilas County Fair Board has submitted a request for a
conditional use permit to allow camping by circus workers at the Vilas County Fairgrounds, July
13-15, 2026. The Vilas County Fairgrounds property, Parcel 221 -182, 133 South Forrest Street, is
described as Sect. 32, T40N,R10E, MILL LOT 1 COUNTY CLERK'S PLAT GOVT LOT 1 & PRT SE NE EXC
23-382,196-598,580174, 584885 RESOLUTION 441482.
c) Conditional Use Permit Public Hearing: The Vilas County Fair Board has submitted a request for a
conditional use permit to allow camping by carnival workers at the Vilas County Fairgrounds during
the County Fair, August 13 -16, 2026, with additional shoulder dates as required for set- up/tear-
down of the fair attractions. The Vilas County Fairgrounds property, Parcel 221 -182, 133 South
Forrest Street, is described as Sect. 32, T40N,R10E, MILL LOT 1 COUNTY CLERK'S PLAT GOVT LOT
1 & PRT SE NE EXC 23-382,196-598,580174, 584885 RESOLUTION 441482.
d) Rezoning Public Hearing : Resolution to consider the rezoning and subsequent change to the
Comprehensive Plan of the City of Eagle River, for Elm Drive properties listed below from
Parks/Recreation to Office/Residential zoning classification
:
i) Tuff: Parcel #221 -1058-5801, 1020 Elm Drive, SE -SE,Sect. 33, T40N,R10E, PRT SE SE. Full
description in tax roll.
ii) Hom: Parcel #221-1058-6012, SE-SE,Sect. 33, T40N,R10E, LOT 3 22CS212 CSM 5874 PRT SE SE.
Full description in the tax roll.
iii) Buskager: Parcel #221-1058-6011, 1025 Elm Drive, SE-SE,Sect. 33, T40N,R10E, LOT 2 22CS212
CSM 5874 FKA PRT SE SE EXC 540834.
e) Information Only - Meadows – Withdrawal of request to purchase City-Owned Parcel Adjacent to
655 N Bond.
5) Adjournment.
Robin Ginner, City Administrator
June 4, 2026
A meeting of the Plan Commission of the City of Eagle River was called to order at 5:00pm by Mayor Deb
Brown.
Roll Call: Alex Forer, Mary Horant, Brad Adamovich, Adam Grassl, John Hletko, Kim Schaffer and Deb
Brown. Also in attendance Robin Ginner and Becky Bolte.
Motion by Horant, 2
nd by Hletko to approve the minutes of the 5-7-2026 meeting. Carried, all.
a) Conditional Use Permit Public Hearing Continuation: Request by Amerco Real Estate Company/U-Haul
for a conditional use permit to construct two (2) self-storage units totaling 51,977 square feet at 1100 N.
Railroad Street, EagleRiver, computer number 221-1019-06, in accordance with Chapter 106, Article VI,
Division 7, Sec 106-473Uses permitted by conditional grant, (8) Storage buildings not used for habitation
– human or animal. Shawn Odden, representative for U-Haul Company of WI, was present. Ginner
reported that updated engineering plans by Vreeland Associates Land Surveyors and Engineers had been
supplied to the city. Justin Vreeland answered questions regarding the updated plans. Erosion
Control/Storm Water Management/Maintenance/Operation plan, landscaping plan, lighting and siding
samples were presented. Mayor Brown opened the floor for public comments at 5:20PM with two
minute time limits for public comments. The public hearing included extensive testimony from
approximately 16 residents and business owners who opposed the project, citing concerns about
aesthetics, impact on local businesses, and potential flooding issues. Mayor Brown closed the public
comments portion of the public hearing at 5:45PM. Discussion on key concerns raised included the
storage units' impact on property values, visual appearance conflicting with the Northwoods aesthetic,
and potential infrastructure damage from removing 6 feet of fill material during construction. Vreeland
explained their stormwater management plan involving infiltration basins and ditches. MSA Engineering
has not had ample time to review the engineering plans for the city. The commission discussed the
constraints of Wisconsin Act 67, which put limitations on denying conditional use permits. Bluebird Road
business owners, including Jay Stock from Tribute Brewing Company and Jay Johnstone and Vito
Bortolotti from Bortolotti's Cin Cin, requested additional time to obtain property appraisals to assess the
financial impact on their businesses. The commission acknowledged the strong public opposition but
noted the legal constraints around denying permits based on aesthetics/opinions alone, while expressing
concerns about the project's impact on local businesses in the BID district and the need for proper
stormwater management. Discussion. Motion by Hletko, 2
nd by Horant to schedule a special Planning
Commission meeting on June 17, 2026, to give business owners and city engineers time to do due
diligence. Carried on a roll call vote, all.
b) Final Plan Review – Bike/Pedestrian crossing at Bridge & Spruce Streets (GHT & ERRP) Laura
VanValkenberg, President of Great Headwaters Trails Foundation, and JoAnn Simmons, Executive Director
of Eagle River Revitalization Program presented DOT ready plans set for submission as drawn by Becher
Hoppe. Aaron Wallner of Becher Hoppe was available via zoom for questions. Discussion. Motion by
Grassl, 2
nd by Forer to recommend final plan review approval to City Council for the bike/pedestrian
crossing at Bridge and Spruce Steets pending timing of the construction is coordinated with the city, any
alteration or destruction of existing sidewalks along Railroad St is coordinated with the city, and push
button assemblies be installed on both the east and west side of Hwy 45 crossing as well as in the median.
Carried on a roll call vote. 4/2 Ayes: Grassl, Forer, Adamovich, Hletko Nays: Horant, Schaffer
c) Dennis Meadows, Formal Request: Purchase of City-Owned Parcel Adjacent to 655 N Bond: Meadows
has requested to purchase 60’ of frontage at the T-docks of city owned land directly across from his
family owned parcel at 655 N Bond. Meadows presented an affidavit from 1944 regarding the Lake Park
Addition and parties M.D. Hirzel and G.F. Bond. Discussion with petitioner Dennis Meadows, Commission,
and the public. Ginner reported that Attorney Garbowicz has advised the city not to sell requested parcel
and that adverse possession does not apply to a municipality. Motion by Grassl, 2nd by Hletko to postpone
until Meadows can provide the Commission with a full title search and the City Attorney is able to provide
legal opinion on chain of title with the information provided in the full title search. Carried on a roll call
vote, all.
d) Comprehensive Plan - Scheduling of future comprehensive plan sessions as stand-alone meetings.
Discussion. Commission to suspend the sessions for the summer and to resume Comprehensive Plan
Update meetings beginning September 17, 2026, at 5:00PM with a set two hour time limit.
e) Discussion Only on Sponsor/off-site signage displayed year-round at local facilities (ie: Snowmobile
Derby Track, Vilas County Fairgrounds) Ginner presented that there is currently no distinction in city code
between off premise signs and sponsorship signs. Ginner to research options to bring back to the
Commission.
Motion by Horant, 2
nd by Forer to adjourn at 8:03PM. Carried, all.
Legal Notice
Publish twice, beginning June 15, 2026 – Affidavit requested
NOTICE OF PUBLIC HEARING
CITY OF EAGLE RIVER PLANNING COMMISSION
Amerco Real Estate Company/U-Haul is requesting a conditional use permit to construct two (2) self-
storage units totaling 51,977 square feet at 11 00 N. Railroad Street , Eagle River, computer number
221-1019-06, in accordance with Chapter 106, Article VI, Division 7 , Sec 106-473 Uses permitted by
conditional grant, ( 8) Storage buildings not used for habitation – human or animal. The property,
zoned as Highway Commercial, is described as: Sec. 28, T40N, R10E PRT NW NW . Complete legal in
tax roll.
The City of Eagle River Planning Commission has scheduled a public hearing for Thursday, July 2, 2026
at 5 pm, located in the Eagle River Common Council Chambers, 525 E. Maple Street, Eagle River, WI
54521.
Comments can be made in person at the public hearing or by mail to City Administrator, PO. Box 1269,
Eagle River, WI 54521; by phone (715) 479- 8682 x227 or email rcginner@eagleriverwi.gov .
Documents will be available for review at City Hall. PETITIONERS, OR THEIR REPRESENTATIVES, SHALL
BE PRESENT.
1
Robin Ginner
From: Robin Ginner
Sent: Thursday, June 18, 2026 3:48 PM
To: vicwash@sbcglobal.net; COER Mayor
Subject: FW: City of Eagle River Proposed U-Haul Facility Stormwater Review
Attachments: WinSLAMM v10_UHaul_Inputs.pdf; WinSLAMM v10_UHaul_Outputs.pdf; Hauling on
substandard road research and experience.pdf; Research Summary_ Limiting Pavement
Damage from Detours _ MnDOT Digital Library.pdf; COUNTY ROAD UPGRADE AND
MAINTENANCE AGREEMENT.pdf; 6-18-26_ESTIMATE OF PROBABLY COSTS - Pulverize
and overlay option.pdf; 6-18-26_ESTIMATE OF PROBABLY COSTS - Base Replacement
option.pdf; 00088145 U-Haul Plan Review Memo.pdf
See attached and below for the recommendations from MSA on stormwater mitigation.
Thanks,
Robin
Robin Ginner
City Administrator
City of Eagle River
Note my new email address: rcginner@eagleriverwi.gov
Elected Officials and Members of City Committees: In order to comply with Open Meetings Act Requirements, please limit any reply
to only the sender of this electronic communication. Please be aware that written communication, emails and faxes are generally
considered open public records.
From: John Promer <jpromer@msa-ps.com>
Sent: Thursday, June 18, 2026 3:17 PM
To: Robin Ginner <rcginner@eagleriverwi.gov>
Subject: City of Eagle River Proposed U-Haul Facility Stormwater Review
Hello Robin,
We have completed reviewing the U-Haul Stormwater plans and have several observations and
recommendations we outline in the attached technical memo and supporting reference attachments.
I reached out to our stormwater experts for additional input.
The basic highlights from the review are:
Is that design does meet current code ( NR 151) for 1 & 2 year stormwater events, meets the
infiltration and suspended solids requirements; and is therefore suƯicient.
Some of their stormwater modeling shows outputs that diƯer from other modeling, report, and the
plans. As a result it should be updated and results further explained.
2
We recommend adding the bio-filtration areas to the sides of the basins in addition to the bottoms
of the basins.
We recommend adding an equalization culvert under one of the entrances.
We recommend adding fractured rip rap at the ends of culverts.
We recommend the biofiltration area at the bottom of the basins be extended to include the sides
of the infiltration basins. As well as adding note that the detail applies to all of the infiltration basins.
We recommend adding a fence around the infiltration basins to protect from public’s entry.
Properties to the west of Bluebird road are at or below the road’s current elevation.
Regrading and or a combination of grading and infiltration basins are recommended on
these properties.
Further mitigation of stormwater onto these properties could include adding curb and
gutter and associated storm sewer to the streets.
Would you be able to share the time for the meeting discussing this on July 2nd ? 5pm?
If you have additional questions, please let us know.
Have a great rest of the day,
John
John Promer, P.E. | Project Engineer, Public Works
Licensed in WI & MI
MSA Professional Services, Inc.
100% Employee Owned
+1 (715) 304-0415
1835 NORTH STEVENS STREET, RHINELANDER, WI 54501
P (715) 362-3244 TF (800) 362-4505
WWW.MSA-PS.COM
Page 1 of 2
G:\00\00088\00088145\Documents\U-Haul Stormwater Review\00088145 U-Haul Plan Review Memo.docx
Memo
To: City Of Eagle River
From: John Promer - MSA Professional Services Inc.
Subject: U-Haul Storm Water Management Review
Date: June 17, 2026
MSA has recently been retained by the City of Eagle River to provide Stormwater Mangement
plan review for the planned U-Haul Development along North Bluebird Road and Airport Road
located within the City of Eagle River.
The recommended materials and design considerations outlined in this memorandum are
based on the exhibits provided to MSA on May 29, 2026. This document is intended to serve
as a general guide and standard for use during the design phase of the project. Final design
details, specifications, and construction methods will be subject to review and approval by the
City of Eagle River and applicable reglatory agencies.
Recommended Erosion Control Materials:
Erosion Control Blanket: (Class 1 Type B, Urban)
o For 4:1 or Steeper Slopes that are to be mowed.
o Bio-Degradeable double netting.
o Bio-Degradeable Stakes/Staples.
o Erosion blanket shall be from the DOT Erosion Control PAL acceptability list.
Observations & Reccomendations:
It was observed that there is no rip rap shown at the ends of culverts.
o It would be recommended to use 100% fractured rip rap at a 6inch minus gradation.
It was observed from proposed site plan that the basins are approximately 4feet deep and that
there is no fencing around the infiltration basins to protect them. o It is recommended that a fence be installed around the infiltration basins to protect public
safety and to discourage unauthorized public access to the infiltration basins. This is
particularly from adjacent roadways and the nearby snowmobile/ATV trail.
It was observed that there is no equalization culvert under the southern most entrance. o It is recommended that a properly sized culvert be added.
It was observed in the Stormwater Management Plan that the current analysis indicates a pre-
development 100-year peak discharge of 1.04 cfs, while the post-development 100-year peak
discharge from the report is 4.26 cfs peak.
MEMO
June 17, 2026
Page 2 of 2 G:\00\00088\00088145\Documents\U-Haul Stormwater
Review\00088145 U-Haul Plan Review Memo.docx
o As noted above, the report includes the 100-yr post-development flow as 4.26 cfs.
However, the HydroCAD report indicated the outlet flow is 7.30 cfs for the 100-yr event.
Please update the report or provide justification for the 4.26 cfs result.
o Additional stormwater management measures should be evaluated to further attenuate
peak flows and minimize the increase in 100-yr discharge from the site to the maximum
extent practical. o Vilas County does not have additional post-construction requirements from NR 151.
Therefore, only the 1-yr 24-hr and 2-yr 24-hr storm events are regulated. Given the HSG
A soils at the site, meeting the 100-yr 24-hr pre- vs post-construction flows is difficult.
The proposed basins total area is greater than the required 2% of the project site.
Therefore, the design is sufficient to meet NR 151 requirements if additional measures
are not feasible.
It is unclear what mitigation factors are to be used after the infiltration basins overflow as shown
in detail on sheet C7 of the proposed stormwater plan and detail.
o It is recommended to add clarity and further address the overflow discharge.
o Include the location of the emergency overflows on the plans, including dimensions and
elevations. Indicate overtopping flow paths or entrance points to municipal systems.
Weir velocities shown in HydroCAD do not exceed 2 fps during the 100-yr storm, so
vegetated or paved flow paths will be sufficient.
WinSLAMM inputs do not match HydroCAD or the plans. See the attached WinSLAMM output
for correct inputs. The solution shows a TSS reduction of 93.01% and infiltration of 92.20%.
Therefore, the design is sufficient. Please update the results in the report accordingly.
Update the plans to note that the infiltration basin detail is for all basins, or provide details for all.
Include a separate detail for basins P3 and P4, to show the shared overflow spillway between.
Observations Regarding Adjoining properties to the West of the proposed U-Haul Development
Properties to the west of the proposed development along Bluebird road are at or below the
existing road elevation.
o Additional stormwater management measures are recommended to prevent additional
runoff impacts
Such as recommend regrading areas, Infiltration Basins, and/or adding
additional stormwater management features to the properties to the west of
Bluebird Road and to the proposed development.
Additional features for stormwater control before it enters the properties could
include regrading road for addition of curb and gutter, and storm sewer.
John Promer P.E.
Project Engineer
MSA Professional Services, Inc.
Data file name: C:\Users\mamundson\OneDrive - MSA Professional Services, Inc\Desktop\Offline Projects\Eagle River UHaul Review\UhaulWaterQuality.mdb
WinSLAMM Version 10.4.1
Rain file name: C:\WinSLAMM Files\Rain Files\WI_Multi_rain\GreenBay\WisReg - Green Bay WI Annual 1969.ran
Particulate Solids Concentration file name: C:\WinSLAMM Files\v10.1 WI_AVG01.pscx
Runoff Coefficient file name: C:\WinSLAMM Files\WI_SL06 Dec06.rsvx
Residential Street Delivery file name: C:\WinSLAMM Files\WI_Res and Other Urban Dec06.std
Institutional Street Delivery file name: C:\WinSLAMM Files\WI_Com Inst Indust Dec06.std
Commercial Street Delivery file name: C:\WinSLAMM Files\WI_Com Inst Indust Dec06.std
Industrial Street Delivery file name: C:\WinSLAMM Files\WI_Com Inst Indust Dec06.std
Other Urban Street Delivery file name: C:\WinSLAMM Files\WI_Res and Other Urban Dec06.std
Freeway Street Delivery file name: C:\WinSLAMM Files\Freeway Dec06.std
Apply Street Delivery Files to Adjust the After Event Load Street Dirt Mass Balance: False
Pollutant Relative Concentration file name: C:\WinSLAMM Files\WI_GEO03.ppdx
Source Area PSD and Peak to Average Flow Ratio File: C:\WinSLAMM Files\NURP Source Area PSD Files.csv
Cost Data file name:
If Other Device Pollutant Load Reduction Values = 1, Off-site Pollutant Loads are Removed from Pollutant Load % Reduction calculations
Seed for random number generator: -42
Study period starting date: 01/02/69 Study period ending date: 12/28/69
Start of Winter Season: 12/02 End of Winter Season: 03/12
Date: 06-17-2026 Time: 16:28:01
Site information:
LU# 1 - Commercial: Commercial 1 Total area (ac): 0.421
1 - Roofs 1: 0.268 ac. Pitched Connected PSD File: C:\WinSLAMM Files\NURP.cpz
13 - Paved Parking 1: 0.110 ac. Connected PSD File: C:\WinSLAMM Files\NURP.cpz
51 - Small Landscaped Areas 1: 0.042 ac. Normal Sandy PSD File: C:\WinSLAMM Files\NURP.cpz
70 - Water Body Areas: 0.001 ac. PSD File:
LU# 2 - Commercial: Commercial 2 Total area (ac): 0.934
1 - Roofs 1: 0.333 ac. Pitched Connected PSD File: C:\WinSLAMM Files\NURP.cpz
13 - Paved Parking 1: 0.387 ac. Connected PSD File: C:\WinSLAMM Files\NURP.cpz
51 - Small Landscaped Areas 1: 0.200 ac. Normal Sandy PSD File: C:\WinSLAMM Files\NURP.cpz
70 - Water Body Areas: 0.014 ac. PSD File:
LU# 3 - Commercial: Commercial 3 Total area (ac): 0.081
1 - Roofs 1: 0.021 ac. Pitched Connected PSD File: C:\WinSLAMM Files\NURP.cpz
13 - Paved Parking 1: 0.007 ac. Connected PSD File: C:\WinSLAMM Files\NURP.cpz
51 - Small Landscaped Areas 1: 0.049 ac. Normal Sandy PSD File: C:\WinSLAMM Files\NURP.cpz
70 - Water Body Areas: 0.004 ac. PSD File:
LU# 4 - Commercial: Commercial 4 Total area (ac): 0.119
1 - Roofs 1: 0.034 ac. Pitched Connected PSD File: C:\WinSLAMM Files\NURP.cpz
51 - Small Landscaped Areas 1: 0.078 ac. Normal Sandy PSD File: C:\WinSLAMM Files\NURP.cpz
70 - Water Body Areas: 0.007 ac. PSD File:
LU# 5 - Commercial: Commercial 5 Total area (ac): 0.975
1 - Roofs 1: 0.513 ac. Pitched Connected PSD File: C:\WinSLAMM Files\NURP.cpz
13 - Paved Parking 1: 0.331 ac. Connected PSD File: C:\WinSLAMM Files\NURP.cpz
51 - Small Landscaped Areas 1: 0.105 ac. Normal Sandy PSD File: C:\WinSLAMM Files\NURP.cpz
70 - Water Body Areas: 0.026 ac. PSD File:
LU# 6 - Commercial: Commercial 6 Total area (ac): 0.180
51 - Small Landscaped Areas 1: 0.180 ac. Normal Sandy PSD File: C:\WinSLAMM Files\NURP.cpz
Control Practice 1: Biofilter CP# 1 (DS) - DS Biofilters # 1
1. Top area (square feet) = 810
2. Bottom aea (square feet) = 1
3. Depth (ft): 6
4. Biofilter width (ft) - for Cost Purposes Only: 10
5. Infiltration rate (in/hr) = 8
6. Random infiltration rate generation? No
7. Infiltration rate fraction (side): 1
8. Infiltration rate fraction (bottom): 1
9. Depth of biofilter that is rock filled (ft) 0
10. Porosity of rock filled volume = 0
11. Engineered soil infiltration rate: 13
12. Engineered soil depth (ft) = 2
13. Engineered soil porosity = 0.43
14. Percent solids reduction due to flow through engineered soil = 80
15. Biofilter peak to average flow ratio = 3.8
16. Number of biofiltration control devices = 1
17. Particle size distribution file: Not needed - calculated by program
18. Initial water surface elevation (ft): 0
Soil Data Soil Type Fraction in Eng. Soil
User-Defined Soil Type 1.000
Saturation water content percent (Porosity) = 0
Field capacity (%) = 0
Permanent Wilting Point (%) = 0
Infiltration rate (in/hr) = 13
Biofilter Outlet/Discharge Characteristics:
Outlet type: Broad Crested Weir
1. Weir crest length (ft): 5
2. Weir crest width (ft): 5
3. Height of datum to bottom of weir opening: 5
Outlet type: Surface Discharge Pipe
1. Surface discharge pipe outlet diameter (ft): 0.67
2. Pipe invert elevation above datum (ft): 3.15
3. Number of surface pipe outlets: 1
Control Practice 2: Biofilter CP# 2 (DS) - DS Biofilters # 2
1. Top area (square feet) = 6100
2. Bottom aea (square feet) = 500
3. Depth (ft): 6
4. Biofilter width (ft) - for Cost Purposes Only: 10
5. Infiltration rate (in/hr) = 8
6. Random infiltration rate generation? No
7. Infiltration rate fraction (side): 1
8. Infiltration rate fraction (bottom): 1
9. Depth of biofilter that is rock filled (ft) 0
10. Porosity of rock filled volume = 0
11. Engineered soil infiltration rate: 13
12. Engineered soil depth (ft) = 2
13. Engineered soil porosity = 0.43
14. Percent solids reduction due to flow through engineered soil = 80
15. Biofilter peak to average flow ratio = 3.8
16. Number of biofiltration control devices = 1
17. Particle size distribution file: Not needed - calculated by program
18. Initial water surface elevation (ft): 0
Soil Data Soil Type Fraction in Eng. Soil
User-Defined Soil Type 1.000
Saturation water content percent (Porosity) = 0
Field capacity (%) = 0
Permanent Wilting Point (%) = 0
Infiltration rate (in/hr) = 13
Biofilter Outlet/Discharge Characteristics:
Outlet type: Broad Crested Weir
1. Weir crest length (ft): 10
2. Weir crest width (ft): 5
3. Height of datum to bottom of weir opening: 4.5
Outlet type: Surface Discharge Pipe
1. Surface discharge pipe outlet diameter (ft): 1
2. Pipe invert elevation above datum (ft): 4.15
3. Number of surface pipe outlets: 1
Control Practice 3: Biofilter CP# 3 (DS) - DS Biofilters # 3
1. Top area (square feet) = 5000
2. Bottom aea (square feet) = 460
3. Depth (ft): 4
4. Biofilter width (ft) - for Cost Purposes Only: 10
5. Infiltration rate (in/hr) = 8
6. Random infiltration rate generation? No
7. Infiltration rate fraction (side): 1
8. Infiltration rate fraction (bottom): 1
9. Depth of biofilter that is rock filled (ft) 0
10. Porosity of rock filled volume = 0
11. Engineered soil infiltration rate: 13
12. Engineered soil depth (ft) = 2
13. Engineered soil porosity = 0.43
14. Percent solids reduction due to flow through engineered soil = 80
15. Biofilter peak to average flow ratio = 3.8
16. Number of biofiltration control devices = 1
17. Particle size distribution file: Not needed - calculated by program
18. Initial water surface elevation (ft): 0
Soil Data Soil Type Fraction in Eng. Soil
User-Defined Soil Type 1.000
Saturation water content percent (Porosity) = 0
Field capacity (%) = 0
Permanent Wilting Point (%) = 0
Infiltration rate (in/hr) = 13
Biofilter Outlet/Discharge Characteristics:
Outlet type: Sharp Crested Weir
1. Weir length (ft): 10
2. Invert elevation above datum (ft): 3.5
Outlet type: Broad Crested Weir
1. Weir crest length (ft): 5
2. Weir crest width (ft): 4
3. Height of datum to bottom of weir opening: 3
Control Practice 4: Biofilter CP# 4 (DS) - DS Biofilters # 4
1. Top area (square feet) = 5000
2. Bottom aea (square feet) = 800
3. Depth (ft): 4
4. Biofilter width (ft) - for Cost Purposes Only: 10
5. Infiltration rate (in/hr) = 8
6. Random infiltration rate generation? No
7. Infiltration rate fraction (side): 1
8. Infiltration rate fraction (bottom): 1
9. Depth of biofilter that is rock filled (ft) 0
10. Porosity of rock filled volume = 0
11. Engineered soil infiltration rate: 13
12. Engineered soil depth (ft) = 2
13. Engineered soil porosity = 0.43
14. Percent solids reduction due to flow through engineered soil = 80
15. Biofilter peak to average flow ratio = 3.8
16. Number of biofiltration control devices = 1
17. Particle size distribution file: Not needed - calculated by program
18. Initial water surface elevation (ft): 0
Soil Data Soil Type Fraction in Eng. Soil
User-Defined Soil Type 1.000
Saturation water content percent (Porosity) = 0
Field capacity (%) = 0
Permanent Wilting Point (%) = 0
Infiltration rate (in/hr) = 13
Biofilter Outlet/Discharge Characteristics:
Outlet type: Broad Crested Weir
1. Weir crest length (ft): 10
2. Weir crest width (ft): 4
3. Height of datum to bottom of weir opening: 3.5
Control Practice 5: Biofilter CP# 5 (DS) - DS Biofilters # 5
1. Top area (square feet) = 2000
2. Bottom aea (square feet) = 1140
3. Depth (ft): 7
4. Biofilter width (ft) - for Cost Purposes Only: 10
5. Infiltration rate (in/hr) = 8
6. Random infiltration rate generation? No
7. Infiltration rate fraction (side): 1
8. Infiltration rate fraction (bottom): 1
9. Depth of biofilter that is rock filled (ft) 0
10. Porosity of rock filled volume = 0
11. Engineered soil infiltration rate: 13
12. Engineered soil depth (ft) = 2
13. Engineered soil porosity = 0.43
14. Percent solids reduction due to flow through engineered soil = 80
15. Biofilter peak to average flow ratio = 3.8
16. Number of biofiltration control devices = 1
17. Particle size distribution file: Not needed - calculated by program
18. Initial water surface elevation (ft): 0
Soil Data Soil Type Fraction in Eng. Soil
User-Defined Soil Type 1.000
Saturation water content percent (Porosity) = 0
Field capacity (%) = 0
Permanent Wilting Point (%) = 0
Infiltration rate (in/hr) = 13
Biofilter Outlet/Discharge Characteristics:
Outlet type: Broad Crested Weir
1. Weir crest length (ft): 10
2. Weir crest width (ft): 4
3. Height of datum to bottom of weir opening: 4.75
SLAMM for Windows Version 10.4.1
(c) Copyright Robert Pitt and John Voorhees 2019, All Rights Reserved
Data file name: C:\Users\mamundson\OneDrive - MSA Professional Services, Inc\Desktop\Offline
Projects\Eagle River UHaul Review\UhaulWaterQuality.mdb
Data file description:
Rain file name: C:\WinSLAMM Files\Rain Files\WI_Multi_rain\GreenBay\WisReg - Green Bay WI
Annual 1969.ran
Particulate Solids Concentration file name: C:\WinSLAMM Files\v10.1 WI_AVG01.pscx
Runoff Coefficient file name: C:\WinSLAMM Files\WI_SL06 Dec06.rsvx
Pollutant Relative Concentration file name: C:\WinSLAMM Files\WI_GEO03.ppdx
Residential Street Delivery file name: C:\WinSLAMM Files\WI_Res and Other Urban Dec06.std
Institutional Street Delivery file name: C:\WinSLAMM Files\WI_Com Inst Indust Dec06.std
Commercial Street Delivery file name: C:\WinSLAMM Files\WI_Com Inst Indust Dec06.std
Industrial Street Delivery file name: C:\WinSLAMM Files\WI_Com Inst Indust Dec06.std
Other Urban Street Delivery file name: C:\WinSLAMM Files\WI_Res and Other Urban Dec06.std
Freeway Street Delivery file name: C:\WinSLAMM Files\Freeway Dec06.std
Apply Street Delivery Files to Adjust the After Event Load Street Dirt Mass Balance: False
Source Area PSD and Peak to Average Flow Ratio File: C:\WinSLAMM Files\NURP Source Area PSD
Files.csv
Cost Data file name:
If Other Device Pollutant Load Reduction Values = 1, Off-site Pollutant Loads are Removed
from Pollutant Load % Reduction calculations
Seed for random number generator: -42
Start of Winter Season: 12/02 End of Winter Season: 03/12
Model Run Start Date: 01/02/69 Model Run End Date: 12/28/69
Date of run: 06-17-2026 Time of run: 16:34:30
Total Area Modeled (acres): 2.710
Years in Model Run: 0.99
Runoff Percent Particulate
Particulate Percent
Volume Runoff Solids
Solids Particulate
(cu ft) Volume Conc.
Yield Solids
Reduction (mg/L)
(lbs) Reduction
Total of all Land Uses without Controls: 146332 - 65.79
601.0 -
Outfall Total with Controls: 11421 92.20% 58.90
42.00 93.01%
Annualized Total After Outfall Controls: 11579
42.58
WisDOT has a standard bid item for haul road maintenance which includes travel on public
roadways. That is similar to what would be required below. In that bid item, the contractor
is responsible for any damage to area roadways that are affected by the Work.
For your project, the municipality has every right to restrict loads on their roadways. The
roadway should be posted to officially limit traffic. It could be posted as a Class B highway
or other restrictions for reduced axle loads. An ordinance is required along with signs
posted in order for the weight limits to be enforced by local law enforcement.
A few MSA Experiences from over the years
1. In a municipal client community 8 years ago, a contractor working for the local
school district hauled many hundreds of fully loaded vehicles on a roadway with
very little pavement and base. The roadway was damaged in many areas including
huge ruts and base course pumping through the asphalt. So yes, this happens. The
City claimed the roadway was not a truck route and not designed to handle heavy
loads. The contractor agreed to contribute many thousands of dollars to the City to
repave the roadway. This was after the fact though.
2. On another project 6 years ago where a PW/City contractor was hauling excavated
material to a remote waste site off a town road. We monitored the roadway (took
photos and videos, preconstruction) and wrote some special procedures about
existing roadway maintenance. The contractor did a good job of hauling only at
certain times (this was a winter project, so hauling at night or early morning when
frozen). There was limited damage to the roadway during construction and the
contractor did agreement to repair minor sections of the town road.
After the experiences noted above, it can be worth adding a bid item to certain projects
where the local roads are needed for hauling material and equipment. This would be one
method to basically require the contractor to review roadways and repair damaged
pavement. Documentation of existing road conditions prior to hauling on the road(s) would
be a crucial aspect of the method.
1
TEMPLATE
TOWN ROAD UPGRADE AND MAINTENANCE AGREEMENT
This TOWN ROAD UPGRADE AND MAINTENANCE AGREEMENT (this
“Agreement”) is made and entered into this ___ day of __________, 20___ by and between the
Town of Holland (the “ Town”), and __________________________________________ (the
“Operator”).
RECITALS
WHEREAS, [insert appropriate language describing the operation such as mining, manure
hauling, timber sales, etc.] [In the case of a mining operation: Operator is in the business of
mining and production of silica sand, and is in the process of constructing, developing,
operating, maintaining and reclaiming a non -metallic mining facility (the “Project”) in the
Town of Holland , Wisconsin, and has submitted an application for a Non -metallic Mining
Reclamation Permit for the Project with the County of La Crosse in accordance with the Non -
metallic Mining Reclamation Ordinance of La Crosse County, and ]
WHEREAS, in connection with the construction, development, oper ation, maintenance
and reclamation of the Project, the Parties desire to address certain issues relating to the roads
owned, operated and maintained by the Town (collectively, the “ Town Roads”) over which it
will be necessary for Operator and Operator’s R epresentatives to, among other things, transport
heavy equipment and certain locally sourced materials, [including, but not limited to, silica
sand,] over certain Town Roads, which may in certain cases be in excess of the design limits of
the Town Roads; and both parties acknowledge that certain of the Town Roads may not be
constructed to withstand the frequency and weight of shipments necessary for the Operator to
transport its products and equipment.
WHEREAS, Wis. Stat. §349.16(1)(c) authorizes the Town Board to enter into an
agreement with any owner or operator of any vehicle being operated on a highway maintained by
the Town that provides that the Town will be reimbursed for any damage done to the highway,
and
WHEREAS, Operator has provided to Town a site layout plan for the Project that shows
the access road entrances, a copy of which is attached as Exhibit A (the “Plan”), and
WHEREAS, Operator and Town wish to set forth their understanding and agreement as to
the road issues r elating to the construction, development, operation, maintenance and
reclamation of the Project, and
WHEREAS, this Agreement shall apply to those Town Roads listed on the attached
Exhibit B and, subject to Section 4 .B. herein, any other Town Ro ad(s) used by Operator or
Operator’s Representatives in direct support of the construc tion, development, operation,
maintenance and reclamation of the Project.
2
AGREEMENT
NOW, THEREFORE, in consideration of the mutual promises and covenants h erein set
forth, the parties, intending to be legally bound, agree as follows:
Section 1. Term of Agreement.
This Agreement shall commence upon the date indicated above (the
“Effective Date”) and shall continue in full force and effect until
[Operator’s Non-metallic Mining Reclamation ] Permit has expired, has
been terminated, or until Operator has fully discontinued its construction,
development, operation, maintenance and reclamation of the Project and
any and all transportation activities related ther eto on the Town Roads
listed on Exhibit B, whichever occurs later.
The Operator shall notify the Town in writing of the designated haul route
at least three weeks before hauling materials over a Town road. The Town
or its representative will subsequently survey the existing condition of that
haul route to establish a baseline for assessing damage that the Operator’s
hauling operation might cause. The process of surveying the route will
incorporate but is not limited to, previous PASER rating logs, video
recording, soil borings and structure evaluations.
Section 2. Operator, in respect to the Project constructed, developed, operated,
maintained and reclaimed by it, acknowledges and agrees the Project may
require Town to undertake the following activities in order to preserve
Town Roads and that the Operator shall be financially responsible for the
costs of said activities to the extent provided for under the terms of this
Agreement:
A. The cost of upgrading pavement sections on Town Roads to withstand the
hauling of products and equipment that are necessary for the Project shall
be done to standards in accordance with the appropriate/applicable
sections of the WIDOT, Facilities De velopment Manual, and in
accordance with Chapter 82 of the State Stats and T RANS 204 of the
Administrative Code.
B. The cost of u pgrading the geometric design of the Town Roads that will
safely and efficiently accommo date the traffic that Operator has indicated
the Project will generate; including improvements at entrances,
intersections and to the typical cross-section, shall be done to a standard as
directed by the WIDOT, Facilities Development Manual and in
accordance with Chapter 82 of the State Stats and TRANS 204 of the
Administrative Code . Geometric improvements shal l also include any
improvements to Structures and Culverts necessary to accommodate the
increased traffic from the Project.
3
Structures already programmed for replacement or reconstruction in the
Wisconsin Department of Transportation Bridge Program will not be
subject to cost share. During the replacement of a W IDOT programmed
structure, the Town will work with the Operator to ensure that the
structure is replaced as quickly as possible so as not to inconvenience the
operator, however, there may be peri ods of time that an alternate route
shall be designated and that route may be subject to load posting or
hauling permits.
C. The cost for p roviding Engineering P lans for all improvements needed
under Sections 2.A. and 2.B. above, including any Right-of-Way needed.
D. Operator shall be responsible for all exceptional maintenance costs, above
normal maintenance requirements, that are attributable to damage to Town
Roads from the hauling of products and equipment related to the Project.
Said maintenance cost may occur either before or after any of the
improvements to Town Roads indicated in Sections 2.A., 2.B. and 2.C.
above are made. Town shall inform Operator if it has a good faith basis to
believe any exceptional mainten ance costs become necessary and provide
a good faith estimate of costs to Operator prior to commencing work.
Town will invoice the Operator for exceptional maintenance costs
incurred as the work is completed. Operator shall have thirty (30) days
from the date of invoicing to make payment to Town.
E. In order to compensate Town for repairs needed as a result of Operator’s
use and to accomplish the work indicated in Sections 2.A., 2.B. and 2.C.
above, Operator shall make a payment to Town of
__________________________________Dollars ($__________) at the
time of execution of this Agreement. Based on the construction plans
provided by the Operator and cost estimate agreed upon by both parties,
the paym ent amount should be sufficient for Town to make nee ded
improvements to the Haul Route.
Notwithstanding the above , Operator acknowledges that conditions may
be encountered or additional requirements imposed by the WIDOT or
other regulatory agency that require additional work by the Town and that
the cost of all additional work is the responsibility of the Operator. When
improvements are complete the Town will invoice the Operator for any
additional costs incurred. Operator shall have thirty (30) days from the
date of invoicing to make payment to Town.
After construction of the improvements is complete any remaining funds
will be returned to Operator within thirty (30) days of project audit by
Town.
4
F. At the discretion of the Town, a bond may be required to insure against
costs associated with excessive wear and tear on Town Roads.
Section 3. Town, in accordance with the terms of this Agreement, agrees to:
A. Review for approval all access points to the Town Road system by giving
consideration to sight distances, drainage and proximity to other entrances,
in a reasonable manner, and in accordance with accepted engineering
practices;
B. Review for approval permits for all utility encroachments on Town rights-
of-way in a reasonable manner, and in accordance with accepted
engineering practices;
C. Coordinate with Operator and Operator’s Representatives so as to
minimize the impact of their use of the Town Road system;
D. Perform all maintenance and construction of all improvements pursuant to
this Agreement on the Town Roads used for the construction,
development, operation, maintenance and reclamation of the Project.
E. Keep those Town Roads listed on the attached Exhibit B of this
Agreement open to Operator to haul products and equipment related to the
Project for the enti re term of this Agreement without further restrictions,
other than those indicated in this Agreement, for all vehicles meeting
statutory requirements for weight, width, height and length. Town shall
retain the right and its authority to establish and set traffic speed limits in
accordance with generally accepted highway standards and safety
practices.
Section 4. Road Inventory.
A. Routing and Access Approval.
This Agreement applies only to the Town Roads listed on the attached
Exhibit B of this Agreement. If conditions or circumstances change and
Operator desires to change haul routes, it must first request authorization
from the Town. All expenses for additional haul routes are not part of this
Agreement and shall be negotiated by the Operator and Town in a separate
agreement in the event any changes are requested.
B. Incidental Use
The Parties recognize that the Project traffic may, either through mistake
or with the consent of Town, use Town Roads other than those listed on
Exhibit B of this Agreement. Repairs for damage caused by Operator or
Operator’s Representatives during such mistaken or permitted use shall be
treated as exceptional maintenance under Section 2.D. above.
5
Section 5. Construction Cooperation.
A. Operator.
Operator shall submit to Town a schedule with planned activities that
affect the Town Roads. Said Schedule shall reasonably indicate the
estimated number of trucks that will be hauling products and equipment
and daily hours of operation. Operator shall submit the Schedule to Town
within two (2) weeks of execution of this A greement. Operator shall
further provide Town with an updated S chedule within two (2) weeks of
any material changes being made with the Project. Operator understands
that Town Road construction and maintenance activities will be on -going
while Project hauling is occurring , and that while Town Roads will be
open to traffic , Operator acknowledges that these activities may slow
hauling operations.
B. Town:
During the term of this Agreement, Town and Operator shall meet as
needed to discuss Project activities and Town Road construction and
maintenance schedules. Town agrees to keep those Town Roads specified
in Exhibit B open to Project traffic during Town Road construction and
maintenance activities, except that Town may temporarily close any of the
Town Roads specified in Exhibit B for replacement of a culvert, structure
or due to an emergency. Town will provide a temporary alternate haul
route when reasonably practicable. Annu al seasonal weight limitations
shall apply to all haul routes in Exhibit B and to any alternate routes
approved by Town.
Town agrees to exclusively use any payments received from Operator as
part of 2(E) of this Agreement on Town Roads used as haul rout es by the
Operator.
C. Emergency Actions.
Notwithstanding the foregoing, in the event Operator or Operator’s
Representatives have caused damage to Town Roads of a magnitude
sufficiently great to create a hazard to the motoring public, which in
Town’s opinion warrants an immediate repair or Town Road closing,
Town may unilaterally close those Town Road(s) affected and make or
authorize repair, with the reasonable, documented costs thereof paid for by
Operator.
Both Parties acknowledge that while Town is the Jurisdictional Authority
for those Town Roads listed in Exhibit B, certain emergency situation s
may arise that fall under law enforcement, fire district or emergency
6
management control. In such situations the road may be closed to traffic,
including traffic from the Project, outside the control of Town. Town
shall not be responsible for any harm to Operator , Operator’s
Representatives or the Project that may result from Town Road closings
that occur due to such emergencies.
Section 6. Indemnification/Hold Harmless and Liability Insurance Provisions.
A. Indemnification by Operator . Operator hereby releases and agrees to
indemnify and hold harmless Town and its respective officers, employees,
elected or appointed officials, and agents , and their respective heirs,
executors, administrators, successors and assigns (hereinafter collectively
“Town Releasees”) from any and all third party actions, causes of action,
suits, claims, expenses (including reasonable attorney’s fees) and demands
against Town Releasees arising out of or relating to the performance by
Operator of its obligations under this Agreement. More particularly, but
without in any way limiting the foregoing, Operator hereby releases Town
Releasees and agrees to indemnify and hold harmless Town Releasees from
any and all third party actions, causes of action, suits, claims, expenses
(including reasonable attorney’s fees) and demands arising directly or
indirectly from any personal injury, death or property damage arising out of
the use by Operator or Operator’s Representatives of any Town Road
subject to this Agreement.
1. Limitations of Liability . In no event shall Town or any of their
Board, officers, elected or appointed officials, agents, investors,
principals, share holders, members or employees be liable (in
contract or in tort, involving negligence, strict liability, or otherwise)
to the Operator or its contractors, suppliers, employees, members
and shareholders for indirect, incidental, consequential or punitive
damages resulting from the performance, non -performance or delay
in performance under this Agreement.
2. Required Insurance. Operator shall at all times throughout the term
of this Agreement maintain in full force and effect commercial
general liability insurance, naming Town, its Board, officers, elected
or appointed officials, agents and employees as an additional
insured, in the aggregate amount equal to
____________________________________ dollars ($ ________)
of primary and/or excess insurance to satisfy this requirement.
Or
Required Escrow. Operator shall at all times throughout the term of
this Agreement establish and ma intain in full force and effect an
escrow account in the amount of _____________ dollars ($
________) to cover performance of this Agreement.
Section 7. Remedies and Enforcement.
7
Each of the Parties hereto covenant and agree that in the event of default
of any of the terms, provisions or conditions of this Agreement by any
party (the “Defaulting Party”), which def ault is not caused by the party
seeking to enforce said provisions (the “Non -Defaulting Party”) and after
notice and reasonable opportunity to cure has been provided to the
Defaulting Party, then in such an event, the Non -Defaulting Party shall
have the ri ght of specific performance. The remedy of specific
performance and injunctive relief shall not be exclusive of any other
remedy available at law or in equity.
Section 8. Savings/Severability.
It is mutually agreed by the Parties that in the event any provision of this
Agreement is determined by any court of law of competent jurisdiction to
be unconstitutional, invalid, illegal or unenforceable in any respect, it is
the intention of the parties that such unconstitutionality, invalidity,
illegality or unenforceability shall not affect the other provisions, and the
Agreement shall be construed as if such unconstitutional, invalid, illegal or
unenforceable provision had never been contained in this Agreement.
Section 9. Entire Agreement.
This Agreement and the exhibits attached thereto constitute the entire
agreement among the Parties hereto with respect to the subject matter
hereof, and supersede any prior understandings or written or oral
agreements between the parties with respect to the subject matter of this
Agreement. No amendment, modification, cancellation or alteration of the
terms of this Agreement shall be binding on any party hereto unless the
same is in writing, dated subsequent to the date hereof and is duly
authorized and executed by the Parties hereto.
Section 10. Designated Representative.
FOR TOWN:
David Carlson, Chair
Town of Holland
W7937 County Road MH
Holmen, WI 54636
FOR OPERATOR:
____________________
____________________
____________________
____________________
Section 11. Notices.
8
All notices to be given under the terms of this Agreement shall be in
writing and signed by the person serving the notice and shall be sent via
registered or certified mail, return receipt requested, postage prepaid, or
hand delivered to the addresses of the parties listed below. Notice shall be
deemed to have been received on the date of receipt as shown on the
return receipt or other written evidence of receipt.
Section 12. Assignability/Consent.
This Agreemen t shall be binding on the Parties hereto, their respective
heirs, devisees and successors. Except as otherwise provided herein, or
except as may be hereafter determined by the Parties, Operator may not
sell, assign or transfer its interest in this Agreeme nt, or any of its rights,
duties or obligations hereunder, without the prior written consent of Town.
Whenever the consent or the approval of Town is required herein, Town
shall not unreasonably withhold, delay or deny such consent or approval.
Section 13 . Choice of Law and Forum Selection.
This Agreement shall be governed by, and construed, interpreted and
enforced in accordance with the laws of the State of Wisconsin. The
Parties agree, for any claim or suit or other dispute relating to this
Agreement that cannot be mutually resolved, the venue shall be in the
Circuit Court of La Crosse County, and the parties further agree to submit
themselves to the jurisdiction of said court, to the exclusion of any other
judicial district that may have jurisdiction over such a dispute according to
any law.
Section 14. Waiver of Terms and Conditions.
The failure of a Party to enforce or insist upon compliance with any of the
terms or conditions of this Agreement shall not constitute a general waiver
or relinquishment of any such terms or conditions, but the same shall be
and remain at all times in full force and effect.
Section 15. Cooperation.
The Parties agree to cooperate with each other in addressing any
unforeseen or extraordinary events caused by Operator’s activity that
would result in significant impacts to the Town Roads. The parties further
agree to cooperate with each other in addressing any unforeseen impact to
Operator’s ability to utilize the haul route or any alternative route provided
for in this Agreement.
9
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the
day and year first written above.
OPERATOR:
________________________.
By: _______________________
Its _______________________
TOWN:
_________________________________
By: David Carlson
Chairman, Town of Holland
EXHIBIT A
The Plan
EXHIBIT B
Haul Routes
DATE: 6/18/2026 2026
2026
GENERAL
1 Mobilization, Bonds, & Insurance 1 L.S. 40,000.00$ 40,000$
2 Erosion and Sedimentation Control 1 L.S. 5,000.00$ 5,000$
3 Traffic Control 1 L.S. 5,000.00$ 5,000$
4 Turf Restoration 1 L.S. 10,000.00$ 10,000$
5 Adjust Manhole Casting 2 EA. 2,000.00$ 4,000$
6 Adjust Water Valve Box 2 EA. 500.00$ 1,000$
ROADWAY - North Bluebird Rd.
7 Unclassified Excavation (Includes Removals) 1 L.S. 15,000$ 15,000$
8 Furnish and install 10 Inch Thick Aggregate Base Course, 1 1/4 -inch 2,400 S.Y. 28$ 67,200$
9 Excavation Below Subgrade 30 C.Y. 25$ 750$
10 Furnish & Install Granular Borrow 30 C.Y. 25$ 750$
11 Gravel Shoulder, 3-Inch Thick 200 S.Y. 25 $ 5,000$
12 Furnish & Install 3-Inch Thick Asphaltic Pavement 2,200 S.Y. 27 $ 59,400$
13 Sawcut Asphalt Pavement 200 L.F. 6 $ 1,200$
ROADWAY - Airport Rd.
14 Unclassified Excavation (Includes Removals) 1 L.S. 10,000$ 10,000$
15 Furnish and install 10 Inch Thick Aggregate Base Course, 1 1/4 -inch 1,200 S.Y. 28$ 33,600$
16 Excavation Below Subgrade 30 C.Y. 25$ 750$
17 Furnish & Install Granular Borrow 30 C.Y. 25$ 750$
18 Gravel Shoulder, 3-Inch Thick 100 S.Y. 25 $ 2,500$
19 Furnish & Install 3-Inch Thick Asphaltic Pavement 1,100 S.Y. 27 $ 29,700$
20 Sawcut Asphalt Pavement 200 L.F. 6 $ 1,200$
292,800$
15% 43,920 $
2026 ) 336,720 $
10% 33,700 $
10% 33,700 $
404,120$
Disclaimers & Assumptions
1
2
3
4
5
6 this estimate assumes that the existing pavement depth is equal to the proposed depth
This estimate of probable cost is approximate. Actual construction bids may vary significantly from this estimate due to timing of bids,constructual schedule restraints, labor rate increases, material increases, or other
factors beyond the control of the estimator.
2-12' Lanes with 2' shoulders N. Bluebird 800 Ft Long
2-12' Lanes 150 ft taper to 2-15' lanes 175ft with 2' shoulders airport road (325 Ft Long)
3in asphalt pavment
Contingency
ESTIMATED CONSTRUCTION COST(
Construction Engineering
TOTAL ESTIMATED PROJECT COST:
ESTIMATE OF PROBABLE COSTS
N BLUEBIRD ROAD & AIRPORT ROAD PAVEMENT REPLACEMENT
BASE REPLACMENT OPTION
CITY OF EAGLE RIVER
ITEM
NO. DESCRIPTION QUANTITY UNIT UNIT PRICE
10inch Thick base aggregate replacement
ESTIMATE YEAR:
TOTAL PRICE
Design Engineering
CONSTRUCTION YEAR:
ESTIMATED CONSTRUCTION SUBTOTAL
DATE: 6/18/2026 2026
2026
GENERAL
1 Mobilization, Bonds, & Insurance 1 L.S. 25,000.00$ 25,000$
2 Erosion and Sedimentation Control 1 L.S. 5,000.00$ 5,000$
3 Traffic Control 1 L.S. 5,000.00$ 5,000$
4 Turf Restoration 1 L.S. 10,000.00$ 10,000$
5 Adjust Manhole Casting 2 EA. 2,000.00$ 4,000$
6 Adjust Water Valve Box 2 EA. 500.00$ 1,000$
ROADWAY - North Bluebird Rd.
7 Pulverize Existing Pavement and Shape N. Bluebird Rd. South 750 FT from Airport Rd.2,200 S.Y. 5.00$ 11,000$
8 Unclassified Excavation (Includes Removals) 1 L.S. 5,000$ 5,000$
9 Gravel Shoulder, 3-Inch Thick 200 S.Y. 25 $ 5,000$
10 Furnish & Install 3-Inch Thick Asphaltic Pavement 2,200 S.Y. 27 $ 59,400$
11 Sawcut Asphalt Pavement 200 L.F. 6 $ 1,200$
ROADWAY - Airport Rd.
12 Pulverize Existing Pavement and Shape Airport Rd. West 325 FT from N. Railroad St.1,000 S.Y. 5.00$ 5,000$
13 Unclassified Excavation (Includes Removals) 1 L.S. 5,000$ 5,000$
14 Gravel Shoulder, 3-Inch Thick 100 S.Y. 25 $ 2,500$
15 Furnish & Install 3-Inch Thick Asphaltic Pavement 1,000 S.Y. 27 $ 27,000$
16 Sawcut Asphalt Pavement 200 L.F. 6 $ 1,200$
172,300$
15% 25,845 $
2026 ) 198,145 $
10% 19,900 $
10% 19,900 $
237,945$
Disclaimers & Assumptions
1
2
3
4
5
6 Assumes a pulverize and overly option
this estimate assumes that the existing pavement depth is equal to the proposed depth
Construction Engineering
TOTAL ESTIMATED PROJECT COST:
This estimate of probable cost is approximate. Actual construction bids may vary significantly from this estimate due to timing of bids,constructual schedule restraints, labor rate increases, material increases, or other
factors beyond the control of the estimator.
2-12' Lanes with 2' shoulders N. Bluebird 800 Ft Long
2-12' Lanes 150 ft taper to 2-15' lanes 175ft with 2' shoulders airport road (325 Ft Long)
3in asphalt pavment
Contingency
ESTIMATED CONSTRUCTION COST(
Design Engineering
CONSTRUCTION YEAR:
ESTIMATED CONSTRUCTION SUBTOTAL
ESTIMATE OF PROBABLE COSTS
N BLUEBIRD ROAD & AIRPORT ROAD PAVEMENT REPLACEMENT
PULVERISE AND OVERLAY OPTION
CITY OF EAGLE RIVER
ESTIMATE YEAR:
ITEM
NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE
Legal Notice
Publish twice, beginning June 15, 2026. Affidavit requested.
NOTICE OF PUBLIC HEARING - Correction
CITY OF EAGLE RIVER PLANNING COMMISSION
The Vilas County Fair Board has submitted a Conditional Use Permit request to allow camping by circus
workers at the Vilas County Fairgrounds, July 13 -15, 2026. T he Vilas County Fairgrounds property,
Parcel 221-182, 133 South Forrest Street, is described as Sect. 32, T40N,R10E, MILL LOT 1 COUNTY
CLERK'S PLAT GOVT LOT 1 & PRT SE NE EXC 23-382,196-598,580174, 584885 RESOLUTION 441482.
The City of Eagle River Planning Commission has scheduled a public hearing for Thursday, July 2, 2026
at 5 pm, located in the Eagle River Common Council Chambers, 525 E. Maple Street, Eagle River, WI
54521.
Comments can be made in person at the public hearing or by mail to City Administrator, PO. Box 1269,
Eagle River, WI 54521; by phone (715) 479- 8682 x227 or email rcginner@eagleriverwi.gov .
Documents will be available for review at City Hall. PETITIONERS, OR THEIR REPRESENTATIVES, SHALL
BE PRESENT.
WEST PINE STREET LLC
2303 RIDGEVIEW DR
WAUSAU, WI 54401
WEST PINE STREET LLC
2303 RIDGEVIEW DR
WAUSAU, WI 54401
GPS II INC
PO BOX 997
EAGLE RIVER, WI 54521
EAGLE RIVER RE LLC
1209 TYLER ST NE
MINNEAPOLIS, MN 55413
BEAVERS LAND MANAGEMENT LLC
2220 6TH AVE N
ESCANABA, MI 49829
BTK GROUP LLC
4299 ISLANDVIEW RD
RHINELANDER, WI 54501
HODAG PROPERTY HOLDINGS LLC
7500 BIRCH TREE DR
EAGLE RIVER, WI 54521
THOMAS M POLLACK
PO BOX 186
EAGLE RIVER, WI 54521
KAP HOLDINGS LLC
PO BOX 939
EAGLE RIVER, WI 54521
THOMAS F WRANIK
PO BOX 1266
EAGLE RIVER, WI 54521
THOMAS F WRANIK
PO BOX 1266
EAGLE RIVER, WI 54521
VILAS COUNTY
330 COURT ST
EAGLE RIVER, WI 54521
KEVIN M KADLEC
PO B
OX 348
PORT CHARLOTTE, FL 33981
GERTA
PO Box 1714
EAGLE RIVER, WI 54521
VILAS COUNTY
330 COURT ST
EAGLE RIVER, WI 54521
STUART A LANDAU TRUST
5100 DORSET AVE CHEVY
CHASE, MD 20815
SAS INCOME TRUST
PO BOX 1015
EAGLE RIVER, WI 54521
DANIEL M BAKOTIC TRUST
503 NAVAJO DR
NEW LENOX, IL 60451
PATRICIA A LANGE
24 MEDALIST LN
ROTONDA WEST, FL 33947
MATTHEW J GUTHRIE 149
FIELDSTONE LN DIXON, IL
61021
ELLEN S MOMMAERTS
1740 DUBLIN LN APT 73
NEENAH, WI 54956
CHARLES BURGESS
604 CEDAR LN
PFLUGERVILLE, TX 78660
BRIAN T WIRTH
864 STONECROP DR
HARTFORD, WI 53027
JOHN R BURCZYK TRUST
741 RIVER EDGE
EAGLE RIVER, WI 54521
KATIE L RHEINSCHMIDT
741 E RIVER EDGE RD
EAGLE RIVER, WI 54521
KENT & PATRICIA KOHN TRUST
812 RIVER EDGE
EAGLE RIVER, WI 54521
EVELYN D ABBATE TRUST
812 RIVER EDGE
EAGLE RIVER, WI 54521
MATTHEW J BROWN
N3666 TOWER RD
TIGERTON, WI 54486
DONALD L PETERSON
16804 ENNERDALE AVE
LOCKPORT, IL 60441
Office of Administration 525 E. Maple Street, PO Box 1269, Eagle River, WI 54521 715-479-8682
https://eagleriverwi.gov/
NOTICE OF PUBLIC HEARING
CITY OF EAGLE RIVER PLANNING COMMISSION
The Vilas County Fair Board has submitted a request to allow camping by carnival workers at the Vilas
County Fairgrounds during the County Fair, August 13 -16, 2026, with additional shoulder dates as
required for set -up/tear-down of the fair attractions. T he Vilas County Fairgrounds property, Parcel
221-182, 133 South Forrest Street, is described as Sect. 32, T40N,R10E, MILL LOT 1 COUNTY CLERK'S
PLAT GOVT LOT 1 & PRT SE NE EXC 23-382,196-598,580174, 584885 RESOLUTION 441482.
The City of Eagle River Planning Commission has scheduled a public hearing for Thursday, July 2, 2026
at 5 pm, located in the Eagle River Common Council Chambers, 525 E. Maple Street, Eagle River, WI
54521.
Comments can be made in person at the public hearing or by mail to City Administrator, PO. Box 1269,
Eagle River, WI 54521; by phone (715) 479- 8682 x227 or email rcginner@eagleriverwi.gov .
Documents will be available for review at City Hall. PETITIONERS, OR THEIR REPRESENTATIVES, SHALL
BE PRESENT.
WEST PINE STREET LLC
2303 RIDGEVIEW DR
WAUSAU, WI 54401
WEST PINE STREET LLC
2303 RIDGEVIEW DR
WAUSAU, WI 54401
GPS II INC
PO BOX 997
EAGLE RIVER, WI 54521
GPS II INC
PO BOX 997
EAGLE RIVER, WI 54521
EAGLE RIVER RE LLC
1209 TYLER ST NE
MINNEAPOLIS, MN 55413
EAGLE RIVER RE LLC
1209 TYLER ST NE
MINNEAPOLIS, MN 55413
BEAVERS LAND MANAGEMENT LLC
2220 6TH AVE N
ESCANABA, MI 49829
BTK GROUP LLC
4299 ISLANDVIEW RD
RHINELANDER, WI 54501
HODAG PROPERTY HOLDINGS LLC
7500 BIRCH TREE DR
EAGLE RIVER, WI 54521
THOMAS M POLLACK
PO BOX 186
EAGLE RIVER, WI 54521
KAP HOLDINGS LLC
PO BOX 939
EAGLE RIVER, WI 54521
THOMAS F WRANIK
PO BOX 1266
EAGLE RIVER, WI 54521
THOMAS F WRANIK
PO BOX 1266
EAGLE RIVER, WI 54521
VILAS COUNTY
330 COURT ST
EAGLE RIVER, WI 54521
KEVIN M KADLEC
PO B
OX 348
PORT CHARLOTTE, FL 33981
GERTA
PO Box 1714
EAGLE RIVER, WI 54521
VILAS COUNTY
330 COURT ST
EAGLE RIVER, WI 54521
STUART A LANDAU TRUST
5100 DORSET AVE CHEVY
CHASE, MD 20815
SAS INCOME TRUST
PO BOX 1015
EAGLE RIVER, WI 54521
DANIEL M BAKOTIC TRUST
503 NAVAJO DR
NEW LENOX, IL 60451
PATRICIA A LANGE
24 MEDALIST LN
ROTONDA WEST, FL 33947
MATTHEW J GUTHRIE 149
FIELDSTONE LN DIXON, IL
61021
ELLEN S MOMMAERTS
1740 DUBLIN LN APT 73
NEENAH, WI 54956
CHARLES BURGESS
604 CEDAR LN
PFLUGERVILLE, TX 78660
BRIAN T WIRTH
864 STONECROP DR
HARTFORD, WI 53027
JOHN R BURCZYK TRUST
741 RIVER EDGE
EAGLE RIVER, WI 54521
KATIE L RHEINSCHMIDT
741 E RIVER EDGE RD
EAGLE RIVER, WI 54521
KENT & PATRICIA KOHN TRUST
812 RIVER EDGE
EAGLE RIVER, WI 54521
EVELYN D ABBATE TRUST
812 RIVER EDGE
EAGLE RIVER, WI 54521
MATTHEW J BROWN
N3666 TOWER RD
TIGERTON, WI 54486
DONALD L PETERSON
16804 ENNERDALE AVE
LOCKPORT, IL 60441
Office of Zoning & Administration 525 E. Maple Street, PO Box 1269, Eagle River, WI 54521 715-479-8682
https://eagleriverwi.gov/
City Of Eagle River
Resolution No. _________
A Resolution To Amend The City Of Eagle River Comprehensive Plan Future
Land Use Map And Rezone Certain Properties Located On Elm Drive From
Parks/Recreation To Office/Residential
WHEREAS, the City of Eagle River has received requests to amend the Future Land Use Map of the
Comprehensive Plan and to rezone certain properties located on Elm Drive; and
WHEREAS, the subject properties are currently designated and zoned as Parks/Recreation and are
proposed to be redesignated and rezoned to Office/Residential; and
WHEREAS, the properties affected by this amendment and rezoning are legally described in the City tax
roll and identified as follows:
1. Tuff Property
Parcel No. 221-1058-5801
1020 Elm Drive
SE-SE, Section 33, Township 40 North, Range 10 East, Part of SE-SE.
Full legal description on file in the tax roll.
2. Hom Property
Parcel No. 221-1058-6012
SE-SE, Section 33, Township 40 North, Range 10 East, Lot 3 of Certified Survey Map No. 5874,
recorded as 22CS212, Part of SE-SE.
Full legal description on file in the tax roll.
3. Buskager Property
Parcel No. 221-1058-6011
1025 Elm Drive
SE-SE, Section 33, Township 40 North, Range 10 East, Lot 2 of Certified Survey Map No. 5874,
recorded as 22CS212, formerly part of SE-SE, except Document No. 540834.
Full legal description on file in the tax roll.
WHEREAS, pursuant to Wisconsin Statutes and the City of Eagle River Zoning Ordinance, the Planning
Commission conducted a public hearing on July 2, 2026, at 5:00 p.m. in the Common Council Chambers
at City Hall, 525 East Maple Street, Eagle River, Wisconsin, to receive testimony and public comment
regarding the proposed Comprehensive Plan amendment and rezoning; and
Office of Zoning & Administration 525 E. Maple Street, PO Box 1269, Eagle River, WI 54521 715-479-8682
https://eagleriverwi.gov/
WHEREAS, after consideration of the public testimony, staff review, applicable ordinances, and the goals
and objectives of the City’s Comprehensive Plan, the Planning Commission has recommended approval
of the proposed amendments; and
WHEREAS, the Common Council finds that the proposed Future Land Use Map amendment and
rezoning are consistent with the public health, safety, and welfare of the community and are in the best
interests of the City of Eagle River.
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Eagle River, Wisconsin, that:
Section 1. The Future Land Use Map of the City of Eagle River Comprehensive Plan is hereby amended to
change the future land use designation of the properties identified above from Parks/Recreation to
Office/Residential.
Section 2. The Official Zoning Map of the City of Eagle River is hereby amended to rezone the properties
identified above from Parks/Recreation to Office/Residential.
Section 3. City staff are authorized and directed to make all necessary revisions to the Comprehensive
Plan, Official Zoning Map, and related City records to reflect these amendments.
Section 4. This Resolution shall take effect upon its adoption and publication as required by law.
Adopted by the Common Council of the City of Eagle River, Wisconsin, this ____ day of __________,
2026.
SIGNED:
Debra A Brown, Mayor Date
ATTEST:
Becky Bolte, Clerk Date
Office of Administration 525 E. Maple Street, PO Box 1269, Eagle River, WI 54521 715-479-8682
https://eagleriverwi.gov/
NOTICE OF PUBLIC HEARING
CITY OF EAGLE RIVER PLANNING COMMISSION
The Planning Commission will consider the rezoning, and the subsequent change to the
Comprehensive Plan of the City of Eagle River, for Elm Drive properties listed below from
Parks/Recreation to Office/Residential zoning classification. The properties are described as:
• Tuff: Parcel #221-1058-5801, 1020 Elm Drive, SE-SE,Sect. 33, T40N,R10E, PRT SE SE. Full
description in tax roll.
• Hom: Parcel #221-1058-6012, SE-SE,Sect. 33, T40N,R10E, LOT 3 22CS212 CSM 5874 PRT SE
SE. Full description in the tax roll.
• Buskager: Parcel #221-1058-6011, 1025 Elm Drive, SE-SE,Sect. 33, T40N,R10E, LOT 2
22CS212 CSM 5874 FKA PRT SE SE EXC 540834
The City of Eagle River Planning Commission has scheduled a public hearing for Thursday, July 2, 2026
at 5 pm, located in the Eagle River Common Council Chambers, 525 E. Maple Street, Eagle River, WI
54521.
Comments can be made in person at the public hearing or by mail to City Administrator, PO. Box 1269,
Eagle River, WI 54521; by phone (715) 479- 8682 x227 or email rcginner@eagleriverwi.gov .
Documents will be available for review at City Hall. PETITIONERS, OR THEIR REPRESENTATIVES, SHALL
BE PRESENT.
RORY TUFF
1020 ELM DR
EAGLE RIVER, WI 54521
CITY OF EAGLE RIVER
PO BOX 1269
EAGLE RIVER, WI 54521
SPENCER BUSKAGER
7828 PRIMEVAL LN
ST GERMAIN, WI 54558
KATIE HOM
1005 ELM DR
EAGLE RIVER, WI 54521
1
Robin Ginner
From: Rick Meadows <rick_meadows@msn.com>
Sent: Thursday, June 11, 2026 3:40 PM
To: Robin Ginner
Subject: Withdrawal of Real Estate Purchase Request
Members of the Eagle River Zoning Commission,
Please accept this email as formal notice that I am withdrawing my request to purchase the strip of land
adjacent to my mother's property (655 Bond Blvd) and will not be pursuing the matter further.
My parents, George and Carol Meadows, have been part of the Eagle River community for many years, and as
we prepare for the sale of the property and my mother's transition to assisted living, I have decided it is best
to move forward without further consideration of this request.
I appreciate the opportunity to present the matter and the professionalism shown by the Commission
throughout the process.
Thank you for your time.
Respectfully,
Rick Meadows
Attorney-in-Fact for Carol Meadows