6-9-26 – CC AGENDA FULL PACKET
City of Eagle River · Vilas County · meeting of Jun 9, 2026 · Agenda packets
Open the original document More from City of Eagle River
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Please note that, upon reasonable notice at least 24 hours in advance, efforts will be made to accommodate the needs of disabled
individuals through appropriate aids and services or provide a video link for meetings. For additional information, or to request this
service, please contact the City Clerk's Office at 715-479-8682 ext. 224,525 E. Maple Street, P.O. Box 1269, Eagle River WI 54521.
Date of posting 6/8/2026
AGENDA NOTICE
THE COMMON COUNCIL OF THE CITY OF EAGLE RIVER WILL HOLD A MEETING ON
TUESDAY, JUNE 9, 2026, 6:00 PM AT CITY HALL, 525 E. MAPLE STREET IN EAGLE RIVER.
The meeting will be available via Zoom at the following link:
https://us06web.zoom.us/j/81145375663?pwd=bQHqovHJVhgsraba1g3yEoGUXFGtmf.1
Meeting ID: 811 4537 5663
Passcode: 064873
1. Call to Order
2. Pledge of Allegiance
3. Roll Call
4. Approve the agenda in any order
5. Approve Minutes of Previous Meetings
6. Discussion and Possible Action on the Following Agenda Items:
a) Listing of Public Records Requests to the City of Eagle River
b) MSA Monthly Updates
i. Silver Lake Road project restoration finalization, and addition of rock to north shoulder,
$TBD, Pitlik & Wick
ii. Approval to remove the asphalt in the parking lot on Second Street, south of Wall, and
replace it with millings and chipseal. MSA estimate,
iii. Approval to add double chipseal for the parking lot of Second Street, south of Wall,
Fahrner, $13,389.13
c) Northland Pines School District – Scott Foster retirement, and introduction to new District
Administrator, Tony Duffek
d) Eagle River Light & Water
i. 2025 Compliance Maintenance Annual Report
ii. Discussion of the Public Hearing and Review Process for Fluoridation of the Municipal
Water Supply, including the Fluoridation Project funded by a Wisconsin Department of
Health Services Grant.
iii. Sludge update
e) Department of Public Works
i. Approval to change Yield sign at Main & Court Streets to a Stop sign.
ii. Ordinance 605: Edits to Sec. 74-35. City of Eagle River yard waste disposal facility to
reflect changes made in switching to the dumpster system, including size of branches,
and operating hours.
f) Golf Course
i. Greens Update
ii. Golf Pro Update
a. Employee Play Policy – potential edits to policy
g) Eagle River Fire Department – Fire Chief monthly update
h) Eagle River Police Department - Police Chief monthly update on departmental activities
i. Approval of Camera System for North Railroad/Farmers Market area, $2,383.64, Lorex.
ii. Axon proposal, 10-year technology plan
i) Administrator’s monthly update on activities of all departments
j) Planning Commission:
i. Approve Planning Commission recommendation for the bike/pedestrian crossing at
Bridge and Spruce Steets pending timing of the construction is coordinated with the city,
any alteration or destruction of existing sidewalks along Railroad St is coordinated with
the city, and push button assemblies be installed on both the east and west side of Hwy
45 crossing as well as in the median. Carried on a roll call vote.
k) Eagle River Chamber of Commerce – Application for over highway DOT Banner Permit –
“Welcome to Eagle River – Please visit the Eagle River Visitors Center to pick up a visitor’s
Please note that, upon reasonable notice at least 24 hours in advance, efforts will be made to accommodate the needs of disabled
individuals through appropriate aids and services or provide a video link for meetings. For additional information, or to request this
service, please contact the City Clerk's Office at 715-479-8682 ext. 224,525 E. Maple Street, P.O. Box 1269, Eagle River WI 54521.
Date of posting 6/8/2026
guide”. Requesting signs be hung the week before the 4 th of July, Abbey Gatlin – Executive
Director
l) Street Closing/display of goods/event food trucks/temporary sign/amplification permits:
i. Road Closures/Amplifying Device/Temp Signs: WRJO Street Dances: Thursdays from
July 9 – August 13, 2026, 7PM – 9PM, Intersection of Wall and Main St, Road closures
from 5:30PM – 9:30PM: Wall St – Railroad St to First St / Main Street Alley to Alley.
Temporary signs at event, Bands, Boy Scouts food, VFW beer trailer in closed area. Trish
Keeley
m) Parade Application: Northland Pines High School, Homecoming Parade, September 18, 2026,
4:15PM, Staging at Silver Lake Road and City Hall, begin at Silver Lake Rd and Wall ending at
Hwy 45. Ann Pickart
n) Liquor License Renewals for a term of July 1, 2026 to June 30, 2027:
Notice is hereby given that the undersigned have applied for a license to sell at the premises described
below, in the City of Eagle River, Vilas County, Wisconsin, intoxicating liquor and fermented malt beverages
as descripted by chapter 125 of the Wisconsin Statutes, subject to the limitations imposed by Chapter 125
of the Wisconsin Statutes and all acts amendatory thereof and supplementary thereto and hereby agree to
comply with the laws, regulations. ordinances, and resolutions, state, federal, and loca l, affecting the sale
of such liquors if a license be granted the undersigned.
City of Eagle River 7/1/26 – 6/30/27 Intoxicating Liquor and/or Fermented Malt Beverage Licenses:
Name DBA Physical Address Agent
Class A Combination Liquor and Fermented Malt Beverages:
CMAJ Co Arrow Gift Shop 201 E Wall St Mary Kate Hayes
Dolgencorp LLC Dollar General Store 9967 1060 E Pine St Jessica M Allen
Indianhead Oil Co LLC Circle K #2746049 226 S Railroad St Deborah Clemens
Indianhead Oil Co LLC Circle K #27446257 928 N Railroad St Tyler Sims
Krist Oil Co Krist Food Mart 114 W Pine St Stacy Oas
Kwik Trip Inc. Kwik Trip 131 201 W Wall St Jennifer M Framnes
T.A. Solberg Co Inc. Trigs Food and Drug 925 E Wall St Angela D Miller
T.A. Solberg Co Inc. Trigs Shell Eagle River 1005 E Pine St Angela D Miller
Ultra Mart Foods LLC Pick-n-Save #6351 711 N Railroad St Jeffrey A Doepke
Walgreen Co Walgreens #12545 108 W Wall St Melissa Upchurch
Class A Fermented Malt Beverages:
Narayan Hotels Inc. AmericInn 200 W Pine St Prit Patel
Ganshyam Hotels Inc. Days Inn 844 N Railroad St Prit Patel
Class B Combination Liquor and Fermented Malt Beverages:
Sandbaggers Clubhouse LLC Sandbaggers Clubhouse 457 E McKinley Blvd Michael E Anderson
Brothermanz LLC Brothermanz Bar 207 E Wall St Crystel L Prather
Edy B's Inc The White Spruce 419 N Railroad St Clarence E Blankenship
Erins Pub & Grub LLC Erins Pub & Grub 933 N Railroad St Erin Dreger
Riverstone Brewing Co Riverstone Brewing Co 219 N Railroad St Stephen J Skotzke
Hodag Hospitality Holdings LLC Eagle Lanes 534 W Pine St Michael A Kocourek
Smugglers LLC Smuggler's 123 S Railroad St Renee Holman
Jessica's Cucina LLC Bortolotti's Cin Cin 1114 N Bluebird Rd Jessica Bortolotti-Johnstone
The Craftsman American Tav The Craftsman American Tavern 118 S Main St Danny Goodrich
The Tiny Tap LLC The Tiny Tap 127 S Railroad St Mark J Vanden Boom
The Warehouse Inc. The Warehouse 107 S Railroad St Kim M Adamovich
Veterans Resource Center Inc Veterans Resource Center 418 W Pine St Dennis Geiseman
WCD Complex LLC WCD Complex 1311 N Railroad St Thomas M Anderson
Williams Supper Clubs LLC Williams Pine Gables Supper Club 1002 W Pine St Gregory B Williams
Mary Kate’s Wine Bar LLC Mary Kate’s Wine Bar 205 E Wall St Mary Kate Hayes
Class B Beer:
Hodag Hospitality Holdings LLC Hi Pines Campground LLC 1919 Hwy 45 N Michael A Kocourek
Class C Wine:
Dirty Kidz Crew LLC Toad in the Hole 121 S Railroad St Beth C Millin
Class B Beer and Class C Wine:
Aiello’s on Wall Street LLC Aiello’s on Wall Street 209 E Wall Street Tina M Aiello
ER Walkers LLC Leifs Café 904 N Railroad St Raul Torres
Trees for Tomorrow Inc. Trees for Tomorrow 519 E Sheridan St Amanda Gingerich
Andy’s Up North LLC Andy’s Pontoon Saloon 220 E Wall St Andrew Lichtfuss
Kim’s Wisconsin LLC Eagle Café 1010 E Wall St Shpendi Alimi
o) Picnic licenses:
i. Veterans Center: Denny Geisman, Agent
Please note that, upon reasonable notice at least 24 hours in advance, efforts will be made to accommodate the needs of disabled
individuals through appropriate aids and services or provide a video link for meetings. For additional information, or to request this
service, please contact the City Clerk's Office at 715-479-8682 ext. 224,525 E. Maple Street, P.O. Box 1269, Eagle River WI 54521.
Date of posting 6/8/2026
1) Temporary Class “B” Beer: Burger Bash, 6AM – 6PM, July 18, 2026 , First St to
alley north of Wall from Beer Trailer
2) Temporary Class “B” Beer: WRJO Street Dances, Thursday evenings 7PM – 9PM,
July 9 – August 13, 2026, Corner of S Main and Wall from Beer Trailer
3) Temporary Class “B” Beer: Chamber of Commerce 4th of July Party in the Streets,
6AM – 6PM, July 4, 2026, Main St south of Wall from Beer Trailer
p) Operator’s Licenses:
i. REGULAR: Peter Anderson III, Anthony Barrientos, Genevieve Borich-Coady, Elizabeth
Carlton, Julia Eaker, Luis Gutierrez, Rene Kecker, Jolanta Kryska, Larissa Lukasiewicz,
Elexius Martinson, Thomas Newkirk, Iris Nordine, Becky Nyman, Paige Oxford, Kristine
Pieper, Jessica Pollack, Karen Sailer, Mallory Schmidt, McKenna Silsbury, Tom Stephens
IV, Skylar Strejc, Thomas Stoltman, Matthew Tschannen, Shamra VanArk, Emilie
Wenberg, Justin Wendorf, Lisa Wendorf, Luke Wessel, Eugeana Wiler,
ii. TEMP: Nicole Hebert 6/20/26
q) Direct Sellers Permit:
i. Tree-Ripe Fruit Co, Tanner Spaude seller, 6/10/26 – 12/9/26 Retail Produce at 810 N
Railroad
ii. Zurko Enterprises Inc., Flea Market at Vilas County Fairgrounds, September 5 and 6 ,
2026, 7:00AM – 4:00PM, - Robert Zurko
iii. Donald Malott – Catalina Hot Tubs, Ryan Simmons and Ally Campbell sellers, 7/29/26
– 8/11/26, Hot Tub Sales at Eagle Lanes from tent
iv. Doodleluvbug Creations LLC, Justine and Adam Modjewski sellers, June 2026 – October
2026, Parking lot of Friendship House, Sundays 6AM – 1:30PM, sale of 3D prints from
tent.
v. Atlas Pasty LLC, Julie Greenwald seller, Pasties food truck, ex post facto approval-
6/5/26 at Tribute Brewery, future dates at Dollar General
r) Taxi Drivers License: Christine Towne, VIP Group DBA Eagle River Taxi for term ending 4/30/27
s) Rescheduling of August Regular City Council Meeting due to conflict with Primary Election
t) Approve payment of the bills for the City and the Golf Course
7. Adjourn.
May 12, 2026
A meeting of the Common Council of the City of Eagle River was called to order at 6:00PM by Mayor Deb
Brown.
The Pledge of Allegiance was led by Clerk Bolte and was recited by all present.
Roll Call: Jerry Burkett, Vic Washelesky, Kim Schaffer, and Dan Dumas. Also in attendance: Robin Ginner,
Becky Bolte, Brad Adamovich, Tyler Salvinski, Mike Sanborn, Tony Sable, and Kyle Anderson.
Motion by Burkett, 2nd by Washelesky to approve the agenda in any order. Carried, all.
Motion by Dumas, 2nd by Schaffer to approve the minutes of 4-14-2026 Finance Committee and Common
Council meetings. Carried, all.
Mayor Brown welcomed Sage Rychlock of Daisy Troop 7168 who was in attendance to earn her democracy
badge.
a) Clerk and Administrator provided Council a listing of public records requests to the City of Eagle River for
April 2026.
b) MSA Monthly Updates: John Promer presented a written update including the 2026 Street Projects.
Promer presented options and estimates for paving the parking lot located behind BMO Bank as an addition
to the 2026 Street/Alley projects. Estimate for paving half of the lot was presented at $28,628 and the full lot
estimate was presented at $56,183. Mayor Brown asked what the plan was for paying for this project and
Ginner stated it would come from surplus funds and the money saved in the 2026 Capital Improvement plan
for 2026 by removing a block of First Street. The State Municipal Agreement (SMA) is holding up the projects
and if not received soon, First Street may have to wait. Washelesky asked about just repairing the main hole.
Burkett stated this is a parking lot and a cost effective solution may be to remove the blacktop, gravel, and
add millings. Promer estimated that solution to run $5,000 -$10,000. Motion by Burkett, 2
nd by Schaffer to
remove blacktop, grade and add millings to the whole parking lot. Carried on a roll call vote, all.
Promer presented that during the alley projects construction at both Nicolet & BMO alleys, alley traffic would
need to be re-routed to exit north towards Wall St and that signage is available for proposed re-route. Motion
by Washelesky, 2nd by Dumas to approve Nicolet & BMO 2026 alley traffic re-route during alley construction,
having alley traffic exit to the north towards Wall St with MSA providing signage. Carried, all.
Pitlik & Wick representative Justin Hoffman spoke on the pitted sidewalk condition in front of City Hall, citing
concrete producers have integrated limestone into the concrete formula which makes the surface susceptible
to chlorides, ie salt. The concrete had been replaced in 2024 and Hoffman reported it remains structurally
sound. Recommendations for repair by Pitlik & Wick included applying a polymer base coating on the
sidewalk for surface protection and assessing how the concrete fared over the winter season of salt usage. If
that solution didn’t work, Pitlik would tear it up and replace, citing the surface pitting would probably happen
again. Washelesky felt it was a fair solution but added the concrete finishers may be christening the surface
with water causing the problem. Washelesky also stated applying two coats of clear linseed oil was a cheap
solution for a protective coat. Both Washelesky and Burkett relayed appreciation to Pitlik for offering
solutions and standing by their product. Motion by Washelesky, 2
nd by Dumas to allow Pitlik to repair the
sidewalk in front of City Hall as presented with surface coating, allowing for full replacement if surface coating
does not work. Carried on a roll call vote, all.
Ginner presented the City has received a MSID funding award of $385,610 for the resurfacing of McKinley
Blvd from Railroad to city termini. The estimate to resurface was received in October 2025 at $771,220.
Although the funding award would give the city until 2031 to complete, Ginner expects the project would be
done within the next couple of years.
Agenda item m was addressed out of order.
m) Kathy Linville of Republic Services introduced Operations Supervisor - Hauling Eagle River, Dirk Devries.
Devries stated he has been employed by Republic for 33 years but only recently made the move to locate in
Eagle River and is excited to a part of this community.
c) Eagle River Light & Water:
Sludge disposal update: Sanborn provided an update on sludge disposal, stating they were able to reduce the
tank levels by 200,000 gallons with their spring spread. They remain in negotiations with a private owner of
20 acres that would allow up to 240,000 additional gallons of sludge spread subject to DNR inspection and
approval. The option would be a great cost savings from the hauling to another facility option, but Sanborn
encouraged the continued attempt to locate and purchase 40 acres suitable for spreading. Sanborn reported
sludge test for PFAS showed the number increased and they will continue to monitor.
Mike Sanborn, representing the Lions Club, gave an update on the construction of the Gremban Park
bathrooms stating it is moving along smoothly, and is hopeful construction will be done by the end of June.
Many contractors have provided free or reduced rates for services and materials. Burkett extended an offer
to have his business, CENTURY 21 Burkett & Associates, sponsor a donor recognition plaque be made listing
all of the donors for this project. Funding for restroom cleaning will be swapped with savings of porta potty
removal.
d) Eagle River Department of Public Works:
Adamovich presented that the urinal at the Depot has a ten year history of problems, causing water to
continually run and flood. Adamovich compared replacement prices to others that have been done at
$1,000-$3,000. Adamovich solution would be to remove the urinal completely and cap the plumbing and
make the restroom a unisex designation. Motion by Schaffer, 2
nd by Burkett to approve removal of urinal in
Depot bathroom and conversion to Unisex designation. Carried on a roll call vote, all.
e) Golf Course
Greens Update: Kyle Anderson gave a verbal report stating the course came out of winter the best it’s been
since he’s been Superintendent. Cold weather has sent them backwards. The grounds crew has been working
on cleanup. Upcoming projects include adding sand to the bunkers and sod at the number 8 tee box.
Golf Pro Update: Tony Sable provided a written report stating cold weather has led to 2026 revenues being
down but believes it will rebound with warmer temperatures coming. Sable also represented the need for
cart fleet maintenance, including cart batteries, and supplied a quote for potential upgrade by 2028.
Agenda item K was addressed out of order.
k) Requests to Keep Chickens:
Wyatt presented request stating he had not spoken with neighbors about keeping chickens at this location.
Motion by Burkett, 2
nd by Dumas to allow up to Six (6) chickens, no roosters, to be kept at 612 Wisconsin
Street, Andrew Wyatt. Carried all.
Young presented request with map and neighbor signatures from all sides but had not been able to connect
with Vilas Title owner. Burkett stated this was a double lot that could potentially allow for a grant of up to 12
chickens. Motion by Burkett, 2
nd by Washelesky to allow up to Six (6) chickens, no roosters, to be kept at 114
N Main Street, Chelsea Young. Carried all.
f) Eagle River Fire Department: Fire Chief Jim Randall provided a written update. Randall supplied statistics of
activity. YTD from January – April 2025 the fire department responded to 57 calls, YTD from January to April
2026 the fire department responded to 104 calls. Three additional members completed Emergency Medical
Responder class. Burkett asked if the fire department went on every medical call with Chief Randall replying
no, they wait to be called in by Aspirus ER91.
g) Eagle River Police Department: Salvinski provided a written report of PD activity for April including the
conclusion of the Ripco Credit Union fraud case. Salvinski added the department is transitioning from Field
Training Officer program to the more detailed Police Training Officer program. Chief Salvinski reported the PD
tasers are in need of updating and is pursuing a quote. Burkett asked if taser replacement was budgeted for
with Chief Salvinski stating no.
h) City Administrator’s monthly update on activities of all departments:
Clerk Bolte gave a verbal update on the city website and the ADA WCAG 2.1 Level AA Compliance
Requirement by 4/2028. Bolte and Ginner have been in discussions with vendors about options to meet
requirements. A loose estimate for the cost for an outside provider to rebuild and maintain city website and
meet ADA compliance requirement would cost upwards of $10,000 for implementation the first year with
$5,000 in annual fees. Additional vendors and options are being sought out, and staff will continue to monitor
for any applicable grant availability.
Ginner presented the 2026 chip seal bids received from Fahrner Asphalt Sealers in the amount of
$112,741.83 and from Pitlik & Wick in the amount of $120,352.07. The budgeted amount for the project is
$86,000. The proposed project includes chip sealing the full length of First Street from Sheridan Street to
Tamarack Street; however, the northernmost block adjacent to the Courthouse, between Sheridan Street and
Court Street, is currently planned for repaving as part of the 2026 road project. Ginner stated she remains
hopeful that the City will receive the State Municipal Agreement (SMA) related to LRIP funding for that
section of roadway. If awarded, that block would be removed from the chip seal project, reducing the overall
project cost from the Fahrner bid amount of $112,741.83. Ginner further noted that, if delays in receiving the
SMA continue, the City may consider removing the block of First Street from the 2026 repaving project while
retaining it within this year’s chip seal project. To allow additional time for receipt of the SMA and to provide
a clearer understanding of project scope and available funding, the Council discussed postponing award of
the chip seal contract and scheduling a special meeting within the next several weeks. Motion by Washelesky,
2nd by Schaffer to postpone the 2026 chip sealing award and place on the agenda of Special City Council
meeting to be scheduled before the June Regular Council meeting allowing time to receive SMA and acquire a
full picture of project and funding. Carried, all.
Ginner presented the 2026 chipseal bid from Fahrner at $112,741.83. The budgeted amount was $86,000.
Ginner is hopeful to receive the SMA but if the SMA delay continues, there is a possibility of dropping a full
block of First Street project for this year. To give additional time to receive the SMA, Council suggested
holding a special meeting in a couple weeks to be able to get a more accurate state of the project and the
available funding. Motion by Washelesky, 2
nd by Schaffer to postpone the 2026 chip sealing award and place
on the agenda of Special City Council meeting to be scheduled before the June Regular Council meeting
allowing time to receive SMA and acquire a full picture of project and funding. Carried, all.
Ginner presented the YeaLink phones need to be wiped clean before they could be sold and that she has
been unable to secure a company who would be able to do so, recommending secure disposal of old Yealink
phone system through IT Strategies. Ginner to have IT Strategies provide a quote to bring back to next Council
meeting.
Ginner presented a potential Dog Park location on city owned lot on Commerce Loop. The lot is wet and
would need fill. Discussion on why the Commerce Loop is not an ideal location and on other possible
locations. Burkett stated he is working on securing a location and asked that Dog Park location be added to
the upcoming Special City Council meeting to be scheduled before the Regular June Council meeting.
i) Planning Commission:
Motion by Schaffer, 2nd by Washelesky to accept the planning commission recommendation to approve
conditional use permit to Eagle River Historical Society to place interpretive signs at the Square, Silver Lake
Beach Park and Riverview Park with the condition that placement be done in coordination with Public Works at
City representatives’ discretion. Carried on a roll call vote, all.
Motion by Schaffer, 2
nd by Dumas to accept the planning commission recommendation to adopt Ordinance
604 to Amend Chapter 106 (Zoning) of the Municipal Code of the City of Eagle River, Wisconsin, by adding a
Definition of "Excavation" to Section 106-1: Excavation. Any man-made cut, cavity, trench, depression, hole, or
open pit in the earth's surface formed by the removal of soil, rock, earth, sand, gravel, or other materials,
whether by mechanical equipment, hand tools, blasting, or other means. Excavation includes, but is not limited
to, activities for foundations, basements, footings, trenches for utilities, grading for site preparation, or
removal of unsuitable materials. This term does not include minor landscaping grading that does not exceed
12 inches in depth or 500 cubic feet in volume, or routine maintenance activities exempted under other
provisions of this Code. Carried on a roll call vote, all.
Ginner presented Comprehensive Plan update being done in conjunction with North Central Wisconsin
Regional Planning Commission. Ginner reported the Planning Commission has reviewed Chapters 1-3 after
NCWRPC made updates and review of Chapter 4 - Utilities & Community Facilities. Mayor Brown requested
scheduling Special Planning Commission meetings for Comprehensive Plan update. Ginner to work with
Commissioners to schedule.
j) Eagle River Revitalization: Laura VanValkenberg of Great Headwaters Trails Foundation gave an update on
the progression of the project to install a crossing of Highway 45 -Railroad Street at Spruce, to Riverview Park.
GHT is collaborating with ERRP on the project. VanValkenberg stated the project has received a $50,000
Vibrant Spaces grant and a $50,000 Room Tax grant and GHT is closing the funding gap. To maintain funding
awards, the project must be completed in 2026. VanValkenberg has an estimated final completion date of
October 31, 2026. Construction will avoid weekends, holidays, and scheduled events to minimize traffic
impact. The final plans are to be submitted to the Planning Commission for review.
l) Discussion on proposal from the Town of Lincoln to re-open the Elm Drive Yard Waste site one day per
week, with staffing to be provided and funded by Lincoln. Adamovich spoke to the volume increase Town of
Lincoln users put on the 7 acre site. Burkett stated the city tried in the spirit of cooperation to combine with
Town of Lincoln and abuse by a few ruined it. Mayor Brown added the Hwy G Landfill will be building a demo
pit this year. Motion by Burkett, 2
nd by Schaffer, to politely decline the Town of Lincoln proposal to re-open the
Elm Drive Yard Waste site one day per week with staffing provided and funded by Lincoln. Carried on a roll call
vote, all.
n) Motion by Schaffer, 2nd by Washelesky to adopt Resolution 1075, a resolution urging the Governor of
Wisconsin and State Legislature to enact a comprehensive, transportation funding solution. Carried on a roll
call vote, all.
o) Street Closing/display of goods/event food trucks/temporary sign/amplification permits:
Motion by Schaffer, 2nd by Dumas to approve Street Closing/Amplifying Device/Temp Signs permit to Veterans
Resource Center for Come to the Coop to Support our Troops, August 19, 2026, 6AM – 7PM, First St closed
from Wall to N alley - Tuesday PM no parking signs but leaving a lane open on First, Food and Beer at the
Square, Signs at Square, Denny Geiseman. Carried, all.
Motion by Dumas, 2nd by Washelesky to approve Amplifying Device permit to Bortolottis Cin Cin, Live music at
Bortolotti's Cin Cin, 1114 N Bluebird Rd, Evenings May 15 – Sept 15, 2026, and at Grape Stomp event, all day
Sunday July 19, 2026. Jessica Bortolotti. Carried, all.
p) Picnic licenses: Motion by Burkett, 2nd by Dumas to approve Veterans Resource Center a Temporary Class
“B” Beer license, Denny Geiseman Agent for the following event and location: Come to the Coop to Support our
Troops, August 19, 2026, Corner of Wall St and First from Beer Trailer. Carried, all.
q) Operators Licenses: Motion by Schaffer, 2nd by Washelesky to approve Regular Operators licenses to: Emily
Anderson, David Blackberg, LeeAnn Block, Ramzey Britt, Leah Brown, Deborah Clemens, Kaylee Cornelius,
Nicolas DiPersio, Ava Eswein, Lisa Foss, Melissa Gauthier, Amanda Gingerich, Tasha Grabowski, Marin Gross,
Barry Grosswitz, Diedre Guigli, Joyce Hauser, John Hayes II, Haley Hering, Nicole McCall Hocking, Robert
Kaczkowski, Julie Kitzke, Anne Klessig, Susan LaChapelle, Robert Leach, Joseph LaFata, Gail LaMantia, Bonnie
Lamb, Donald Lynn, Tomas Marrugo, Hillary Marsh, Madi Meisenburg, Kylee Mullenbach, Nancy Olson, Kelvin
Pitlik, Eric Radi, Russell Radowicz, Kaylin Reeb, Cindy Schultz, Skye Seymer, Tyler Sims, Kurtis Stapleton, Sharon
Stapleton, Tracie Tappy, Anna VanPay, Rachel Viesselmann, Timothy Welch, Dana Wiedenbauer, Jayne
Winblad. Carried, all.
r) Motion by Schaffer, 2
nd by Dumas to approve Class A Beer/Liquor Successor Agent for liquor license period
7/1/25 to 6/30/2026: Indianhead Oil Co, LLC, DBA Circle K, 226 S Railroad, Tyer C Sims. Carried on a roll call
vote, all.
s) Direct Sellers Permit: Motion by Washelesky, 2nd by Schaffer to approve Direct Sellers Permit to Adrien K
Kranz, Scott Brandenburg Seller, Nelsons Ace Parking Lot, Cheese, Honey and Maple Syrup, 6 month permit,
approval and dates contingent on applicant submission of all required documents. Carried, all.
t) Motion by Schaffer, 2
nd by Dumas to approve payment of the bills for the city and the golf course as
recommended by the Finance Committee. Carried on a roll call vote, all.
Motion by Washelesky, 2nd by Burkett to adjourn at 7:30PM. Carried, all.
Becky J Bolte - Clerk
May 26, 2026
A Special Session of the Common Council of the City of Eagle River was called to order at 4:00PM by
Mayor Deb Brown.
Roll Call: Jerry Burkett, Vic Washelesky, Kim Schaffer, and Dan Dumas. Also in attendance: Robin
Ginner
Motion/Second ,Washelesky/Schaffer, to approve the agenda in any order. Carried, all.
a) 2026 Road Projects:
a. Motion/Second, Burkett/Washelesky, to change the scope of the 2026 road project to
remove one block of resurfacing 1st Street, from Sheridan to Court Streets. Roll call,
carried.
b. Motion/Second, Washelesky/Dumas, to accept the 2026 chipseal bid from Fahrner for
$112,741.83. Roll call, carried. Passed. Kim Schaffer abstained.
Ginner will come back to the June 9 Council meeting with a request to remove the asphalt at the
parking lot on Second Street, south of Wall, and replace it with millings and chipseal.
b) Golf Course: Motion/Second, Washelesky/Schaffer, to approve the estimate to carve the stump
on the #17 fairway into a perched eagle by Chad Danczyk, $6,000. Carried, all.. Ginner informed
the Council that there is plenty of money in the landscaping budget line item for the golf course
to pay for this project, and still fund the rest of the projects for this coming season. Kyle
Anderson informed the Council that he expects the contractor to begin work in about two
weeks.
c) Changes to Employee Policy Manual: Motion/Second, Washelesky/Dumas, to approve the
definition of Retirement to be added to the Employee Policy Manual, and add a minimum of 10
years of service along with 50 years of age. Carried, all.
d) Disposal of YeaLink Phone System: Motion/Second, Washelesky/Dumas, to dispose of the YeaLink
phone system by IT Strategies, $254.80. Carried, all.
Motion/Second, Burkett/Schaffer, to adjourn at 4:16 PM. Carried, all.
Robin C Ginner, City Administrator
Open Records Request
Clerk - May 2026
1
2
3
4
5
6
A B C D
REQUESTER DATE TOPIC Hours
Vito Bortolotti 5/11/2026 PC 5-7-26 Meeting Recording 5 min
Kathryn Craffey 5/13/2026
Square bldg demo notices/permit, Public Notice for
demo, PC Quorum, Recording Policy, Term Limits,
McKinley LRIP, Council meeting minutes (RCG) 1.5 hours
League of WI Muni 5/14/2026 Municipality Roster 15 min
Oshea Smith 5/19/2026 Vendor Transactions - Completed by Cory Hoffmann 15 min
WI Dept of Admin 5/20/2026 Salaray/Benefit/Postions - (CH) 1.5 hours
Open Records Requests
City Administrator
Date Request From Content Amount of
time
05/28/26 Kathryn Craffey
Camping,
Fairgrounds/Riverside
Park
10 minutes
05/26/26 Kathryn Craffey
Employee policy manual
and Retirement
definition explanation.
5 minutes
05/18/26 Kathryn Craffey
Zoning designation for
both the fairgrounds and
riverside park.
5 minutes
05/15/26 Chelsea Sims
Evironmental and
Development info for
123 N Railroad and 220
E Wall Street
45 minutes
05/13/26 Kathryn Craffey
ERHS signage, Rotary
square development
history and TID program
20 minutes
City of Eagle River
UPDATE
Page 1 of 2
\\msa-ps.com\fs\Project\00\00088\! City of Eagle River\2026 Update\6 9 26 Update.docx
UPDATE A Review of MSA ’s Commitment to Your Community
CLIENT LIAISON:
John Promer P.E.
Phone: 715-304-0415
Cell: 715-605-2331
jpromer@msa-ps.com
DATE:
June 9, 2026
2026 STREETS PROJECT (R00088144)
The project bid date was previously postponed to allow for coordination with Nicolet Bank and required
DOT notification procedures. Following a special Council meeting, the portion of the project related to
DOT notification was removed from the overall scope. With that revision completed, the shortened
project is now moving forward and a new bid date has been established. This adjustment will not
impact the ability to complete construction during the summer season.
NON TID SERVICES 2025 (R00088145)
The Non TID services contract allows MSA to respond quickly to small engineering service requests
as they come up.
SILVER LAKE ROAD (R00088117)
• The project is substantially complete.
• Walkthrough for final Punchlist completed on June 5, after compiling punchlist items; it will be sent
to contractor to address these items.
• MSA will monitor the grass growth before approving payment for the final retainage.
Currently the project is under budget with Change Order # 1 pushing the project costs to slightly above
the bid amount. Change Order #1 added drainage corrections near the end of Mc Faul Lane
Project Contractor: Pitlik and Wick
Bid amount $628,635.70
Project work completed to date $614,362.66
Change Order #1 completed to date $ 46,871.00
Pay Request #3 $173,005.44
Original Change Order #1 amount $ 52,936.00
The City of Eagle River was awarded a $320,971.32 MSID grant from WISDOT for the reconstruction
of Silver Lake Road from the intersection of Sheridan Street and Silver Lake Road to the City limits
(near the swimming beach). Our estimate at the time of the bid was $670,244. The planned project is
to include replacement of the pavement and provisions for a sidewalk on the south side of the project.
PROJECT UPDATE
Page 2 of 2
\\msa-ps.com\fs\Project\00\00088\! City of Eagle River\2026 Update\6 9 26 Update.docx
PROJECT UPDATE City of Eagle River
June 9, 2026
GIS UPDATE (R00088098)
The City upgraded their GIS apps in 2025 to the latest version of ESRI software called ArcGIS
Experience Builder. The City continues to utilize their GIS apps for viewing, tracking maintenance and
keeping inventory of City owned streets and utilities.
USER AGREEMENT WITH LANDFILL UPDATE (R00088141)
MSA will continue to facilitate User Agreement talks between the City of Eagle River and Highway G
Landfill. The discussions relating to updating the agreement have paused, because the City is no
longer accepting the landfill’s leachate. Additional conversations are anticipated in the coming months.
MSA has also periodically shared information with the landfill and their engineer regarding leachate
pretreatment.
GENERAL WASTEWATER ASSISTANCE UPDATE (R00088143)
MSA has provided various technical assistance to the City of Eagle River in recent months.
• We have assisted in evaluation of potential new sites for land application and related items.
• The DNR recently published a draft revision to their Interim Guidance for Land Application that is
now in a public comment period.
o MSA is reviewing the document
o MSA provided the document to the City for reference
o MSA reviewed the City’s effluent samples for biosolids
o MSA recommended the City undertake influent sampling in efforts to gain a better
understanding of potential PFAS sources
o The City has been in communication with the DNR and kept them up to date
WDNR INTENT TO APPLY – CLEAN WATER FUND AND SAFE DRINKING WATER LOAN
PROGRAMS
An ITA was submitted for sewer lining that was part of the Spruce and Third Streets project . An ITA
does not obligate the City to proceed with a project. There is no fee for this service.
It is important to think about what possible projects could come up in the next year to apply for . This
should be looked at like a wish list . Funding changes will happen over the next year, and this is the
required first step in using DNR loan and grant programs.
PROPOSAL / CONTRACT
Job. No. Date: June 04, 2026
Contact Name: Robin Ginner Contract Price $13,389.13
PURCHASER: CITY OF EAGLE RIVER
ADDRESS: PO BOX 1269
EAGLE RIVER, WI 54521
TELEPHONE: (715) 479-8682
DESCRIPTION OF PROPERTY:
Muni Parking Lot - 2nd Street
P.O. Box 1269
Eagle River, WI 54521
1. FAHRNER Asphalt Sealers, L.L.C. (CONTRACTOR) and PURCHASER agree that, CONTRACTOR shall furnish the labor
and materials to complete certain construction in accordance with the following specifications:
Muni Parking Lot - 2nd Street
Approximately 1,111 Square Yards
Double Chip Seal
Fine grade, water, and compact surface. Apply 170 degree emulsified asphalt by full-
width spray distributor. Apply cover aggregate and spread uniformly over surface with
full-width self propelled chip spreader. Roll with pneumatic-tired roller.
Price: $11,242.47
Fog Seal
Apply 170 degree diluted emulsified asphalt by full-width spray distributor.
Price: $2,146.66
This proposal may be withdrawn if not accepted and received by CONTRACTOR within 20 days of the date above and/
or at any time before performance of the work hereunder upon CONTRACTOR'S determination that the PURCHASER is not creditworthy.
2. If proposal is accepted please sign, retain one copy and forward a copy to our office.
3. The undersigned ("PURCHASER") agrees to pay CONTRACTOR the total price of $13,389.13 and/or the unit prices
specified above for the labor and materials specified above which payment shall be due upon completion of each stage of work.
PURCHASER acknowledges that the specifications, conditions and price quotes specified above are satisfactory and hereby accepted.
By my signature herein, I authorize CONTRACTOR to review personal OR business Credit Reports to evaluate financial readiness to pay
amounts set forth in this Proposal/Contract.
Acceptance of this Proposal includes acceptance of all the terms and conditions on back.
CONTRACTOR:
Fahrner Asphalt Sealers, LLC:906-367-0346
colton.tarsi@fahrnerasphalt.com
Colton Tarsi
(PRINT OR TYPE NAME)
By:
(CONTRACTOR REPRESENTATIVE)
Date: June 04, 2026
PURCHASER:
I have read and understand the terms and conditions on both sides
of this contract.
(PRINT OR TYPE NAME)
By:
(PURCHASER AUTHORIZED REPRESENTATIVE)
Date of acceptance:
Page 2 of 2
TERMS AND CONDITIONS
NOTICE OF LIEN RIGHTS
AS REQUIRED BY THE WISCONSIN CONSTRUCTION LIEN LAWS, CONTRACTOR HEREBY NOTIFIES OWNER THAT PERSONS OR COMPANIES FURNISHING
LABOR OR MATERIALS FOR THE CONSTRUCTION ON OWNER’S LAND MAY HAVE LIEN RIGHTS ON OWNER’S LAND AND BUILDING IF NOT PAID. THOSE
ENTITLED TO LIEN RIGHTS, IN ADDITION TO THE UNDERSIGNED CONTRACTOR, ARE THOSE WHO CONTRACT DIRECTLY WITH THE OWNER OR THOSE
WHO GIVE THE OWNER NOTICE WITHIN SIXTY (60) DAYS AFTER THEY FIRST FURNISH LABOR OR MAT ERIALS FOR THE CONSTRUCTION. ACCORDINGLY,
OWNER PROBABLY WILL RECEIVE NOTICES FROM THOSE WHO FURNISH LABOR OR MATERIALS FOR THE CONSTRUCTION, AND SHOULD GIVE A COPY
OF EACH NOTICE RECEIVED TO THE MORTGAGE LENDER, IF ANY. CONTRACTOR AGREES TO COOPERATE WITH THE OWNER AND THE OWNER’S LENDER,
IF ANY, TO SEE THAT ALL POTENTIAL LIEN CLAIMS ARE DULY PAID.
ACCEPTANCE OF WORK
All labor and material is conclusively accepted as satisfactory unless excepted to in writing within seven (7) days of perfor mance.
EXTRA WORK
All alterations or deviations from any of the terms of this contract shall be in writing and executed by the parties hereto. Any extra cost involved therein will become an
extra charge to be paid by PURCHASER over and above the contract price.
PURCHASER’S RESPONSIBILITIES
PURCHASER acknowledges and understands that it shall be responsible for obtaining any and all permits which may be required i n connection with performance of this
Proposal/Contract. Where applicable, PURCHASER shall also be respon sible for backfilling areas that border along the newly paved surface with appropriate material to
eliminate potential cracking and uneven surface at the edge of the paved surface and for installing, replacing, maintaining and repairing shoulders. PURCHASER assumes
all liability for any damages done to underground utilities and/or structures unless CONTRACTOR has been notified, upon accep tance of this Proposal, as to the specific
location and depth of any such buried utility/structures.
Unless exempt, in accepting this Proposal/Contract, PURCHASER acknowledges that it shall comply with the requirements of all applicable federal , state, and local
employment laws, executive orders, codes and regulations (the “Requirements”) effective where the work and/or services are being performed including, but not limited to,
41 CFR §§ 60 -1.4(a)(1)-(8), 60-1.4(b), 60-1.4(c) or their successors effective where this Proposal/Contract is performed. To the extent required by law, all provisions of
the Requirements are hereb y incorporated into and made a part of this Agreement and any applicable agreements of C ONTRACTOR. To the extent applicable, the
Requirements include, but are not limited to, (1) prohibition of discrimination because of protected veteran status, disabili ty, race, color, religion, sex, sexual orientation,
gender identity, national origin and because o f inquiry or discussion about or disclosure of compensation, (2) affirmative action to employ and advance in employment
individuals without regard to race, sex, disability, or protected veteran status, (3) compliance with the Employee Notice cla use contained in 29 C.F.R. part 471, Appendix
A to Subpart A, or its successors, (4) compliance with the EEO -1 and VETS -4212 reports filing requirements in 41 C.F.R. §§ 60 -1.7 and 41 C.F.R. §61 -300.10, or their
successors, (5) compliance with paycheck transparency ob ligations of 48 C.F.R. § 22.2005, including the contract clause found at 48 C.F.R. § 52.222 -60, which is
incorporated by reference as if fully set forth herein, (6) other affirmative action in employment, ( 7) required/certified payrolls, ( 8) social securit y acts, ( 9) unemployment
compensation acts, ( 10) worker’s compensation acts, (1 1) equal employment opportunity acts and (1 2) the required contract provisions for Federal -Aid Construction
Contracts, Form FHWA-1273, if applicable.
When applicable, P URCHASER and CONTRACTOR shall abide by the requirements of 41 CFR 60 -300.5(a). This regulation prohibits discrimination against
qualified protected veterans, and requires affirmative action by covered prime contractors and subcontractors to employ and advance in employment qualified
protected veterans. When applicable, P URCHASER and CONTRACTOR shall abide by the requirements of 41 CFR 60 -741.5(a). This regulation prohibits
discrimination against qualified individuals on the basis of disability, and requires affir mative action covered by prime contractors and subcontractors to
employ and advance in employment qualified individuals with disabilities.
INCLEMENT WEATHER
Inclement weather may alter the completion of the work to be furnished hereunder. Furthermore, sp ecial consideration should be given if work is to be performed before
May 1 or after October 15 in light of less than desirable weather conditions which could potentially impair the quality of th e work performed hereunder.
WARRANTY
All material is guaranteed to be as specified and all work is to be completed in a workmanlike manner according to standard p ractices. All labor and materials will be
guaranteed against defect for one (1) year from date of installation. Due to Wisconsin winters and expansion and contraction of the ground, some cracking of the pavement
may be experienced. There are no express or implied warranties of merchantability, quality, quantity or of fitness for any p articular purpose, which extend beyond those
specifically set out in this document.
All warranties are void if payment is not made as stipulated.
DELINQUENCY CHARGE
Payment is due and payable upon completion of each stage of the work. If PURCHASER defaults on the payment required, PURCHAS ER will be liable for all costs of
collection, including reasonable attorney’s fees, and a delinquency charge on the balance at the maximum rates allowed by law . If PURCHASER is an organization as
defined by Wis. Statutes, Section 421.301(28), the Delinquency Charge rate shall be 1.5% per month (18% APR) plus all costs of collection, including reasonable attorney’s
fees. CONTRACTOR retains title to all merchandise covered by this Agreement until full payment is received according to the above terms of sale. PURCHASER consents
in any action or legal proceeding relating to this Contract commenced by the CONTRACTOR to the personal jurisdiction of any c ourt that is either a court of record in the
State of Wisconsin or a court of the United States located in the State of Wisconsin. It is hereby agreed that no legal action with respect to this contract may be brought
by either party later than one (1) year after the cause of action accrues and that the party asserting such a legal action sh all be barred from any remedy thereto.
INDIVIDUAL LIABILITY
The undersigned PURCHASER agrees to be individually liable for all terms of the Agreement, regardless of whether he or she si gns individually or as an agent for the
owner of the property upon which the work is being performed o r for any other individual, partnership or corporation.
PRODUCT INFORMATION AND MAINTENANCE
Since the asphalt in blacktop needs time to harden and cure, usually 6 -12 months, your asphalt pavement will remain soft and pliable during warm weather. During t his
time, don’t park in the same spot every time and do not turn your steering wheel back and forth when your car is not moving. It is not unusual to experience some cracking
over the winter due to the contraction and expansion of the ground, especially o ver culverts, pipes, electric wires, etc. Avoid gasoline and petroleum product spills as they
will destroy your pavement. If spills do occur, immediately flush with lots of soapy water. If you decide to seal coat your pavement, wait until the summer fol lowing
installation.
BINDING EFFECT
This Agreement shall be binding upon the parties hereto, their heirs, personal representatives, successors and assigns.
ENTIRE AGREEMENT
The entire contract is embodied in this writing. This writing constitutes the fi nal expression of the party’s agreement, and is a complete and exclusive statement of that
agreement. In the event that any term of this contract is unenforceable, the remaining terms of the contract shall still be in full force and effect.
DATE: 5/21/2026 2026
2026
GENERAL
1 Mobilization, Bonds, & Insurance 1 L.S. 30,000.00$ 30,000.00$
2 Erosion and Sedimentation Control 1 L.S. 4,000.00$ 4,000.00$
3 Traffic Control 1 L.S. 5,000.00$ 5,000.00$
4 Turf Restoration 1 L.S. 5,000.00$ 5,000.00$
5 Rock Excavation 15 C.Y. 250.00$ 3,750.00$
6 Furnish & Install Silt Fence 100 L.F 3.00$ 300.00$
7 Furnish & Install Erosion Mat Class 1 Urban, Type B 25 S.Y 3.00$ 75.00$
8 Furnish & Install Inlet Protection, Type C 2 E.A. 100.00$ 200.00$
9 Furnish & Install Inlet Protection, Type D-M 6 E.A. 125.00$ 750.00$
FIRST STREET SHERIDAN TO COURT
10 Remove Pavement 1,350 S.Y. 6.00$
11 Furnish & Install 3" Thick Asphaltic Pavement 1,350 S.Y. 25.00$ $ 33,750.00
12 Furnish & Install 10" Thick Aggregate Base Course 1,350 S.Y. 18.00$ $ 24,300.00
13 Furnish & Install 3.0 Inch Thick Crushed Aggregate Shoulder 3/4-Inch 20 S.Y. 20.00$ $ 400.00
14 Unclassified Excavation 450 C.Y. 25.00$ $ 11,250.00
15 Sawcut Asphalt Pavement 200 L.F. 6.00$ $ 1,200.00
16 Remove & Reinstall Existing Casting w/New Adjustment Rings 5 EA. 450.00$ $ 2,250.00
17 Adjust Water Valve Box 3 EA. 500.00$ $ 1,500.00
ALLEY BETWEEN MAIN STREET & FIRST STREET SOUTH OF WALL STREET
18 Remove Pavement 650 S.Y. 6.00$
19 Furnish & Install 3" Thick Asphaltic Pavement 650 S.Y. 25.00$ 16,250.00$
20 Furnish & Install 10" Thick Aggregate Base Course 650 S.Y. 18.00$ 11,700.00$
21 Unclassified Excavation 250 C.Y. 25.00$ 6,250.00$
22 Sawcut Asphalt Pavement 650 L.F. 6.00$ 3,900.00$
ALLEY BETWEEN RAILROAD & MAIN STREET SOUTH OF WALL STREET
23 Remove Pavement 700 S.Y. 6.00$
24 Furnish & Install 3" Thick Asphaltic Pavement 700 S.Y. 25.00$ 17,500.00$
25 Furnish & Install 10" Thick Aggregate Base Course 700 S.Y. 18.00$ 12,600.00$
26 Unclassified Excavation 250 C.Y. 25.00$ 6,250.00$
27 Sawcut Asphalt Pavement 75 L.F. 6.00$ 450.00$
ALLEY NEAR BMO BANK
28 Remove Pavement 600 S.Y. 6.00$
29 Furnish & Install 3" Thick Asphaltic Pavement 600 S.Y. 25.00$ 15,000.00$
30 Furnish & Install 10" Thick Aggregate Base Course 600 S.Y. 18.00$ 10,800.00$
31 Unclassified Excavation 200 C.Y. 28.00$ 5,600.00$
32 Sawcut Asphalt Pavement 500 L.F. 6.00$ 3,000.00$
ALLEY NEAR NICOLET BANK
33 Remove Pavement 450 S.Y. 6.00$
34 Furnish & Install 3" Thick Asphaltic Pavement 450 S.Y. 25.00$ 11,250.00$
35 Furnish & Install 10" Thick Aggregate Base Course 450 S.Y. 18.00$ 8,100.00$
36 Unclassified Excavation 150 C.Y. 25.00$ 3,750.00$
37 Sawcut Asphalt Pavement 30 L.F. 6.00$ 180.00$
38 Infiltration Trench 1 LS 12,000.00 $ 12,000.00$
City Parking Lot Near BMO Bank
39 Pulverize and Regrade Existing Asphalt Parking Lot 1 L.S. 15,000.00$ 15,000.00$
40 Furnish & Install 3 Inch thick 7/8 Inch Recycled Asphalt 100 C.Y. 20.00$ 2,000.00$
285,305.00$
15% 42,795.75$
328,100.75$
Disclaimers & Assumptions
1
1
2
3
4 Alley near Nicolet only from parking lot south ~235' create infiltration trench on bank property
5 City Parking lot - Pulverise, regrade and top with alsphalt millings
This estimate of probable Construction cost is approximate. Actual construction bids may vary significantly from this estimate due to timing of bids,constructual schedule restraints, labor rate increases,
material increases, or other factors beyond the control of the estimator.
TOTAL ESTIMATED PROJECT CONSTRUCTION COST:
ESTIMATED CONSTRUCTION SUBTOTAL
Alley near BMO ~330' plus parking lot patch 65'+20'
Contingency
Alley Between Main and First ~325' long 16' wide
Alley Between Railroad and Main ~210' long 16' wide
CONSTRUCTION YEAR:
ESTIMATE YEAR:
ESTIMATE OF PROBABLE COSTS
2026 STREETS PROJECT
CITY OF EAGLE RIVER
ITEM
NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL PRICE
- $74,650
$242,253.25
$210,655.00
$31,598.25
Remove 1st
Street
Yes, there have been lawsuits in Wisconsin over water fluoridation. These local disputes
have historically challenged the constitutionality and health claims of fluoridation
ordinances, as well as municipality decisions regarding the introduction or removal of
fluoride in local water systems. [1, 2, 3]
Notable cases and related proceedings include:
• DeForest Lawsuit (2026): A resident in the village of DeForest, Wisconsin, filed a
lawsuit seeking a temporary restraining order and injunction to stop the
municipality from reintroducing fluoride into the public water supply. The village
had previously voted to remove fluoride from the water, but later attempted to
reintroduce it. [1, 2]
• Fond du Lac Challenge (Historical): Citizens in Fond du Lac, Wisconsin,
previously filed a lawsuit against the city requesting a permanent injunction to
prevent water fluoridation. The legal challenge included claims that the
fluoridation ordinance lacked a rational basis, that fluoride consumption caused
serious injuries, and that it violated constitutional privacy rights. [1]
• Federal EPA Lawsuits: Wisconsin residents and water industry workers have also
been involved as plaintiffs in federal actions, such as TSCA (Toxic Substances
Control Act) litigation against the EPA concerning the neurotoxicity of fluoride. [1,
2]
Would you like to know more about the legal arguments used in these cases or explore
the status of fluoridation debates in other specific Wisconsin municipalities?
I have read through an article saying infants should be limited on bottle feeding with water
containing fluoride.
ER Light & Water Fluoridation
The CONS of water fluoridation
The concern about adding fluoride to drinking water usually falls into a few categories: health
risks, ethics/consent, and distrust of public health policy. But it is important to sep arate
established scientific evidence from claims that are weakly supported or disproven.
Here is the balanced picture:
1. Why fluoride is added
o Communities add small amounts of fluoride to water to reduce tooth decay.
Major health organization like the World Health Organization , Center s for
Disease Control an d Prevention, and American Dental Association support
fluoridation because it has been shown to lower cavities, especially in
children and lower-income populations.
2. Main criticisms and concerns
o Risk of overexposure
i. Too much fluoride over long periods can cause problems such as:
1. Dental fluorosis – faint white streaks or spots on teeth; usually
mild.
2. Skeletal fluorosis – bone/joint problems at very high exposure
levels, more common in places with naturally excessive
fluoride.
ii. Critics argue that people already get fluoride from toothpaste, mouth
rinses, food, and beverages, so adding more through water could
increase total exposure.
o Possible neurological concerns
i. Some studies have suggested that very high fluoride exposure may be
associated with lower IQ scores in children. However, many of those
studies involve fluoride levels much higher than those used in
regulated water systems in the U .S. and Canada, or they have
methodological limitations.
ii. Research is ongoing and scientists still debate the significance of these
findings at low fluoridation levels.
o “Mass medication” argument
i. Some people oppose fluoridation because they believe:
1. Individuals should choose whether to consume fluoride.
2. Governments should not add substances intended to affect
health to public water.
3. This is more of an ethical/political argument than a medical one.
o Concerns about industrial byproducts
i. Some opponents worry about the source of fluoridation chemicals,
such as fluorosilic ic acid used in water treatment. Public health
agencies state that these additives are purified and regulated for safety,
but distrust remains among some groups.
3. What mainstream evidence says
o Most large reviews conclude that fluoridated water at recommended levels is
generally safe and effective for reducing tooth decay.
o In the U.S., the recommended level is about 0.7 mg/L, which is below levels
associated with serious health effects.
4. Areas where there is legitimate debate
o There is reasonable discussion about:
i. Whether universal fluoridation is still necessary now that the
toothpaste is widespread.
ii. How to monitor total fluoride exposure.
iii. Whether some infants or sensitive groups should have lower exposure.
iv. Balancing public benefit vs individual choice.
So, the issue is not simply “fluoride is poison” versus “fluoride is perfectly harmless.” The
evidence supports benefits at regulated levels, while critics raise concerns about long term
exposure, consent, and uncertainty around newer research.
Total Cost to add Hydro fluosilicic Acid (Fluoride) to our municipal water between
purchasing the chemical, employee time for testing, sample analysis and shipping is
approx. $7,000 - $7,500 annually.
The PROS of water fluoridation
Adding fluoride to public drinking water can help reduce tooth decay across an entire
population. This practice is called water fluoridation, and many public health
organizations support it because of its dental benefits when fluoride levels are kept within
recommended limits.
Here are the main reasons it’s considered beneficial:
1. Prevents cavities
o Fluoride strengthens tooth enamel, making teeth more resistant to acid from
bacteria and sugary foods.
o It can also help repair very early stages of tooth decay before cavities fully
form.
2. Benefits everyone
o Because it is in the water supply, people receive protection regardless of age,
income, or access to dental care.
o This is especially helpful for children and communities with limited dental
services.
3. Cost-effective public health measure
o Studies have shown that fluoridated water can reduce dental treatment
costs by preventing cavities before they require fillings or extractions.
4. Supported by major health organizations
o Organizations such as the World Health Organization, Centers for Disease
Control and Prevention, and American Dental Association support
community water fluoridation at regulated levels.
5. Uses very small amounts
o Recommended fluoride concentrations are low and carefully monitored. In
the U.S., the recommended level is about 0.7mg/L (milligrams per liter).
There are also debates and concerns raised by some groups about possible health effects
from excessive fluoride exposure. Most mainstream scientific reviews conclude that
fluoridation at recommended levels is safe, though very high fluoride exposure can cause
problems such as dental fluorosis (mild tooth discoloration) or, in extreme cases, bone
issues.
Why the discussion about the continuance of fluoride addition to our municipal water
A few months ago, I was forwarded a WI De partment of Health grant opportunity for
replacement and upgrades to fluoridation equipment. I applied for the grant for two new
fluoride pumps, two new fluoride tanks with radar sensing equipment for measuring fluoride
use totaling $6,042. We received the grant, but it did not cover an additional $2,685 of cost
including shipping of material, DNR form sub mittal, installation labor and travel. I brought
the additional cost to the Light & Water Commission for discussion and potential approval.
A deeper discussion began pertaining to the discontinuance of fluoride addition to the city
water. Before additional dollars were spent on more fluoridation equipment, it was thought
that this would be an appropriate time to review the practice of fluoridation in our municipal
water and whether we wanted to continue doing it. The Commission thought it best to bring
the topic to the City Council as you would have the final say.
Thanks to the assistance of Ai, I have put together a list of pros and cons stating a few of the
hot topics associated with fluoridation.
Required Process to Remove Fluoridation
1. Local Governing Body Action (City Council, Village Board, etc.) The municipal governing
body (e.g., Common Council) must vote to discontinue fluoridation. This is almost always
done by:
o Amending or repealing the existing local ordinance that authorizes or requires
fluoridation.
o Passing a new ordinance that prohibits or stops the addition of fluoride.
2. Typical Steps in Practice (based on how Wisconsin communities have actually done it):
o Committee/Commission Review: The issue is often first discussed in a utility
commission, public works committee, or similar body.
o Public Hearing: Most municipalities hold at least one public hearing to gather
resident input. This is a best practice and often politically necessary, even if not
strictly required by state law.
o Council/Board Vote: The governing body votes on the ordinance change. A simple
majority is usually sufficient.
o Implementation: Once approved, the water utility stops adding fluoride. The DNR
tracks this via the “Treatment Ended” date in their system.
3. Regulatory Notifications:
o The water utility must follow Wisconsin DNR monitoring and reporting rules (NR
809).
o No specific advance state approval is needed to stop adding fluoride (since it is not
required in the first place).
o The utility should update its treatment processes in the DNR’s Drinking Water
System Portal.
4. Public Notification:
o Municipalities usually notify residents through bills, press releases, website
updates, or Consumer Confidence Reports.
o Some issue a specific “Fluoride Discontinuation Notice. ”
Created: 2026-02-11 13:26:58 [EST]
(Supp. No. 26)
Page 1 of 1
Sec. 74-35. City of Eagle River yard waste disposal facility.
(a) Designation. The City of Eagle River hereby designates a Municipal Yard Waste Disposal Facility for the use of
residents of the City of Eagle River, subject to the following rules and regulations.
(b) Authorized users. Use of the yard waste disposal facility is restricted to residents of the city. Proof of
residency may be required.
(c) Acceptable materials. The following materials, generated from residential properties only, may be disposed
of at the facility:
(1) Brush and small branches not exceeding four inches in diameter;
(2) Grass clippings;
(3) Leaf litter.
All debris must be deposited loose and unbagged.
(d) Prohibited materials. The following materials shall not be accepted at the yard waste disposal facility:
(1) Bags of any kind, whether plastic, paper, or compostable;
(2) Lumber or processed wood;
(3) Trees, stumps, branches exceeding four inches in diameter, or debris resulting from the clearing of
properties;
(4) Appliances, household waste, or other non-yard waste debris;
(5) Any yard waste deposited by commercial entities, landscapers, or contractors.
(e) Prohibition of Commercial Use. No commercial or contractor dumping shall be permitted.
(f) Seasonal closure. The facility shall be closed annually from November 1 through April 1, or as weather
conditions dictate.
(g) Enforcement and penalties. Any violation of this section may result in the issuance of municipal citations,
fines as prescribed under the city's general penalty provisions, and/or closure of the facility to the public.
(Ord. No. 599, § 1, 9-9-2025)
Office of Administration & Zoning 525 E. Maple Street, PO Box 1269, Eagle River, WI 54521 715-479-8682
https://eagleriverwi.gov/
CITY OF EAGLE RIVER
RESOLUTION NO. 605
RESOLUTION AMENDING SECTION 74-35 OF THE CODE OF ORDINANCES REGARDING THE
CITY OF EAGLE RIVER YARD WASTE DISPOSAL FACILITY
WHEREAS, the C ommon Council of the City of Eagle River previously adopted Section 74-35 of the City
Code establishing regulations for the operation and use of the City Yard Waste Disposal Facility; and
WHEREAS , the Common Council has reviewed the operation of the facility and determined that revisions
are necessary to improve facility management and clarify disposal requirements; and
WHEREAS, the proposed amendments include reducing the maximum allowable branch diameter from
six (6) inches to four (4) inches, removing the specified hours of operation from the ordinance, and
making related numbering and reference corrections;
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Eagle River, Wisconsin, as
follows:
Section 1. Amendment of Section 74-35.
Section 74-35, “City of Eagle River Yard Waste Disposal Facility,” is hereby amended to:
1. Re
vise subsection (c)(1) to permit disposal of brush and small branches not exceeding four (4)
inches in diameter.
2. Revise subsection (d)(3) to prohibit disposal of trees, stumps, and branches exceeding four (4)
inches in diameter, and debris resulting from the clearing of properties.
3. Repeal subsection (f), “Hours of Operation,” in its entirety.
4. Renumber the remaining subsections as necessary following the repeal of subsection (f).
5. Correct any internal references, lettering, and formatting necessary to maintain consistency
within Section 74-35.
Section 2. Incorporation into Municipal Code.
The City Clerk is authorized and directed to incorporate these amendments into the City of Eagle River
Code of Ordinances and to make any non-substantive formatting, numbering, or cross-reference
corrections necessary to effectuate the intent of this Resolution.
Section 3. Effective Date.
This Resolution and the corresponding ordinance amendment shall take effect upon adoption and
publication as required by law.
Adopted by the Common Council of the City of Eagle River, Wisconsin, this ____ day of __________,
2026.
____________________ _________________________
DEBRA A BROWN, MAYOR BECKY BOLTE, CLERK/TREASURER
Dat
e adopted: __________
Date published: _________
Date effective: __________
Report to the Eagle River City Council – End May 2026
Submitted by Anthony Sable, PGA
Dear Council Members,
The weather in Eagle River has been unseasonably cold for much of May this year. Despite this, we have
generated decent revenue thus far. Our annual Trees for Tomorrow Tournament fundraiser was held May 29th and was a
big success. They had a nice turnout; 128 players, and great weather, which also meant good revenue for the club,
$8,500. (which has yet to be paid and entered into revenue).
CARTS
Carts are in good shape. All are in service as of this report. New windshields look super.
RANGE
We have a fantastic practice range! Range revenue was down thus far compared to last year; $7,877 vs. $9,005.
STAFFING
We added three new young hourly employees, who are very competent and enthusiastic. For now, we have a
good staff of pro-shop folks, outside service people and marshals and starters.
REVENUE FIGURES
Green Fees – through May 31, 2026 – 2,514 rounds - $58,285
Green Fees – through May 31, 2025 – 2,735 rounds - $59,325
Cart Fees – through May 31, 2026 – 1,738 - $26,946 - Cart Fees – through May 31, 2025 – 1,736 - $27,086
Memberships through May 31, 2026 – 242 - $115,306 - Memberships through May 31, 2025 – 238 - $116,225
Merchandise through May 31, 2026 - $15,451 - Merchandise through May 31, 2025 - $11,992
Total Revenue through May 31, 2026 - $228,561 - Total Revenue through May 31, 2025 - $227,983
CONCLUSION
We are off to a promising start, with good staffing, the course in great shape, and by all accounts, very good
customer satisfaction. The new restaurant proprietors are doing well and there are plenty of golfers who stop in after
their round for a drink and a sandwich. After putting significant investment into the clubhouse, it is in good shape and
should provide a comfortable and welcoming setting for years to come.
- Anthony Sable, PGA Golf Professional/General Manager
Eagle River Golf Course
1
Robin Ginner
From: Anthony Sable <tsable@pga.com>
Sent: Thursday, June 4, 2026 9:22 AM
To: COER Mayor; Robin Ginner
Cc: Matthew Molter; KJA Anderson
Subject: Fwd: Eagle River | May Online Performance
---------- Forwarded message ---------
From: Jay Stanula <Jay.Stanula@golfnow.com>
Date: Tue, Jun 2, 2026 at 3:34 PM
Subject: Eagle River | May Online Performance
To: Anthony Sable <tsable@pga.com>
Tony
Now that the month of May is in the books I pulled a reservation report for online rounds and revenue to
see how the course fared. My thoughts…
1. Finished up in rounds and revenue! This is great!
2. Not as many courses were as fortunate as your course as the inconsistent and terrible weather for
a majority of the month caused many courses to be down year over year. Glad to see Eagle River
still had high demand even with the bad weather.
Would love to hear your thoughts on the report below?
JAY STANULA
2
Market Sales Manager, Northwest
Traverse City, MI | 231.350.3850
jay.stanula@golfnow.com
--
Anthony Sable, PGA Head Professional
Eagle River Golf Course
457 McKinley Blvd.
Eagle River, WI, 54521
Page 1 of 2
Comparative Sales
Thursday, January 1, 2026 - Wednesday, June 3, 2026 compared to Wednesday, January 1, 2025 - Tuesday, June 3, 2025
Eagle River Golf Course
Current Period
Previous Period
Delta
Department Name
Category Name
Sub Category Name
Item Name
SKU
Quantity
Sales
Quantity
Sales
Quantity Delta
Sales Delta
Quantity %
Sales %
Green Fee
2,837
$63,189.04
2,917
$62,733.31
(80)
$455.73
-2.74%
0.73%
Green Fees
51
$2,566.71
29
$1,311.15
22
$1,255.56
75.86%
95.76%
Membership
250
$119,693.50
238
$116,225.71
12
$3,467.79
5.04%
2.98%
Other
1
$12.00
10
$793.00
(9)
($781.00)
-90.00%
-98.49%
Pro Shop
3,577
$60,580.33
3,229
$55,132.52
348
$5,447.81
10.78%
9.88%
Total
6716
$246,041.58
6423
$236,195.69
293
$9,845.89
4.56%
4.17%
Thursday, June 4, 2026 2:15 PM EST
Latest Date/Time Data Updated: Thursday, June 4, 2026 2:14 PM UTC
Page 2 of 2
Comparative Sales
Thursday, January 1, 2026 - Wednesday, June 3, 2026 compared to Wednesday, January 1, 2025 - Tuesday, June 3, 2025
Eagle River Golf Course
Thursday, June 4, 2026 2:15 PM EST
Latest Date/Time Data Updated: Thursday, June 4, 2026 2:14 PM UTC
Golf Course Employee Golf Privileges at Eagle River Golf Course
The Head Pro will have the sole discretion to determine when play is permitted in all instances.
1. Employees who work or who are scheduled for 35- plus hours a week receive free green
fees, carts and range. It is limited to 18 holes per day during non-peak tee times.
2. Employees who work or who are scheduled for 80+ hours a month (20 hours a week) will
only receive free green fees. It is limited to 18 holes per day during non -peak tee times.
Riding carts and range balls need to be purchased if they are going to be used. Carts may
be used at the discretion of the Head Pro for a charge of $5 per round.
3. League Play by employees is allowed with golfing privileges as provided above.
4. Tournament Play by employees is exempt from this policy which means employees pay the
regular tournament fee.
5. Privileges can be revoked if this policy is abused or if employee conduct on the course is
negligent, abusive to club property, or in any way interferes with the play and satisfaction
of our paying guests.
Eagle River Golf Course Marketing Report & Proposed Facebook Posts
May 19, 2026
Kim Swisher Communications, LLC. (715) 437-0090 Page 1 of 12
Facebook Page:
As of today, the page has 2,890 followers.
On April 20th, the page had 2,842 followers.
Facebook Insights:
Eagle River Golf Course Marketing Report & Proposed Facebook Posts
May 19, 2026
Kim Swisher Communications, LLC. (715) 437-0090 Page 2 of 12
Facebook Insights (continued):
Eagle River Golf Course Marketing Report & Proposed Facebook Posts
May 19, 2026
Kim Swisher Communications, LLC. (715) 437-0090 Page 3 of 12
Facebook Insights (continued):
Facebook Audience Demographics:
Eagle River Golf Course Marketing Report & Proposed Facebook Posts
May 19, 2026
Kim Swisher Communications, LLC. (715) 437-0090 Page 4 of 12
Facebook Videos:
Video Link - https://www.facebook.com/EagleRiverGolfCourse/reels/
Facebook Ads
Instagram Page:
Eagle River Golf Course Marketing Report & Proposed Facebook Posts
May 19, 2026
Kim Swisher Communications, LLC. (715) 437-0090 Page 5 of 12
Instagram Page (continued):
Google Analytics:
April 20th through May 19th
Eagle River Golf Course Marketing Report & Proposed Facebook Posts
May 19, 2026
Kim Swisher Communications, LLC. (715) 437-0090 Page 6 of 12
March 22nd through April 20th
Visitor Demographics:
The primary age of website visitors in this period was 35-44. Males comprised 66.2% of page visitors.
Website Pages Visitors are Viewing:
Eagle River Golf Course Marketing Report & Proposed Facebook Posts
May 19, 2026
Kim Swisher Communications, LLC. (715) 437-0090 Page 7 of 12
Location of Website Visitors:
State City
Google Ads:
Eagle River Golf Course Marketing Report & Proposed Facebook Posts
May 19, 2026
Kim Swisher Communications, LLC. (715) 437-0090 Page 8 of 12
Proposed Facebook and Instagram Posts:
6/6 – The only thing missing from this tour is you Book your tee time today:
www.EagleRiverGolfCourse.com/teetimes/
Click to view reel
6/9 – Not sure what to pack in your golf bag? @GOLF.com has you covered with a list of essentials to keep you
prepared on the course: https://golf.com/gear/23-golf-bag-essentials/.
6/11 – Fuel up at @Sandbaggers Clubhouse at Eagle River Golf Course before your round or refresh there after
your 18th hole!
Eagle River Golf Course Marketing Report & Proposed Facebook Posts
May 19, 2026
Kim Swisher Communications, LLC. (715) 437-0090 Page 9 of 12
6/14 – It takes a dedicated crew to keep things this green. ⛳️ Huge thank you to our maintenance team for all the
early mornings and hard work!
6/17 – ⛳️☕️ Not sure if golf is your cup of tea? There’s only one way to find out…
Grab your friends, hit the course, and give it a swing! Secure your spot here:
https://eaglerivergolfcourse.com/teetimes/
6/20 – Today is American Eagle Day. What better way to celebrate these magnificent birds than booking tee time at
Eagle River Golf Course? https://eaglerivergolfcourse.com/teetimes/ 🦅
Eagle River Golf Course Marketing Report & Proposed Facebook Posts
May 19, 2026
Kim Swisher Communications, LLC. (715) 437-0090 Page 10 of 12
6/21 – Dad, you’re in a league of your own. ⛳️🏌️♂️🏆
6/25 – Our course is one of the most beautiful you will ever play with wooded fairways, water features and a
setting that reflects the unspoiled beauty of Wisconsin’s Northwoods. But don’t let the beauty overwhelm you, this
is also one of the most challenging courses in the state! https://eaglerivergolfcourse.com/
6/28 – “I have a tip that can take five strokes off anyone’s game: It’s called an eraser.” - Arnold Palmer
Eagle River Golf Course Marketing Report & Proposed Facebook Posts
May 19, 2026
Kim Swisher Communications, LLC. (715) 437-0090 Page 11 of 12
7/1 – Redesigned by Don Herfort in 1988, our Course blends classic charm with modern challenge, featuring
forest-lined fairways, water hazards and gorgeous views. To learn more, visit: www.EagleRiverGolfCourse.com.
7/4 – Happy FORE-th of July! 🎇
7/7 – Cheers to the best cart on the course!
Eagle River Golf Course Marketing Report & Proposed Facebook Posts
May 19, 2026
Kim Swisher Communications, LLC. (715) 437-0090 Page 12 of 12
7/10 – Don’t end your Northwoods vacation before you’ve enjoyed a few rounds on our beautiful green. See you
soon! https://eaglerivergolfcourse.com/teetimes/
We welcome your comments or questions and will schedule these posts upon your approval.
Respectfully submitted,
Team Swisher
Allison Burns, Kassie Bellin, Dina Casso, Karly Kolehouse and Kim Swisher
Office: 715-437-0090
Email: allison@kimswisher.com
Email: kassie@kimswisher.com
Email: dina@kimswisher.com
Email: karly@kimswisher.com
Email: kim@kimswisher.com
Eagle River Fire Department
820 East Pine Street
Eagle River, Wi 54521
(715)479-8835
Fire Chief: Jim Randall
Monthly Report – May 2026
Incident Summary
Call Type Calls
Medical Assists 9
Motor Vehicle Accidents 3
Alarm Activations 6
Motor Vehicle Fires 4
Structure Fires 1
Grass Fires 1
Lines Down 1
Water Rescue 1
Eagle River Fire Department
820 East Pine Street
Eagle River, Wi 54521
(715)479-8835
Fire Chief: Jim Randall
Jurisdiction Breakdown
Town/Area Calls
City of Eagle River 11
Town of Lincoln 6
Town of Washington 4
Town of Cloverland 4
Land O' Lakes 1
Chief's Report
The Eagle River Area Fire Department responded to 26 incidents during May 2026. YTD 130
calls, last year that was the same volume as of September 1. Medical assists remained the
largest call category. A live-fire practice burn was conducted during the month to enhance
operational readiness.
Respectfully Submitted,
Jim Randall
Fire Chief
1
Robin Ginner
From: Ryan Rossing <ryross@vilascountywi.gov>
Sent: Monday, June 1, 2026 9:08 PM
To: Robin Ginner
Cc: Tyler Salvinski
Subject: Fw: Invoice NP4K4MV-168BD, HDD10TB
Please see the quote I received for cameras.
Ryan
Get Outlook for iOS
From: Diana Ferreira <dferreira@lorex.com>
Sent: Monday, June 1, 2026 6:04 PM
To: Ryan Rossing <ryross@vilascountywi.gov>
Subject: Invoice NP4K4MV-168BD, HDD10TB
INVOICE #D42662
Hi,
**PLEASE VERIFY SHIPPING BEFORE COMPLETING ORDER, ALSO ENSURE
BILLING MATCHES CARD BEING USED FOR PAYMENT.**
Please see quote as requested. Please let me know if you wish to place your
order over the phone or if you wish to use the link below. Let me know if you
need any changes made.
**Quote valid for limited time**
Thank you kindly.
Diana Ferreira
2
eCommerce Sales Account Manager
Lorex Technology Inc.
250 Royal Crest Court, Markham, ON L3R 3S1 Canada
Phone: 1-877-369-8831 Ext: 48010
E: dferreira@lorex.com | Pro.lorex.com
You may reach out to Diana Ferreira at dferreira@lorex.com for any inquiries
regarding this quote or to learn more about the benefits of being a partner.
Complete your purchase
or Visit our store
Order summary
Surveillance-Grade Hard Drive × 1
10TB $486.49
Lorex 4K (16 Camera Capable) 4TB Wired NVR
System with Nocturnal 3 Smart IP Turret Cameras
with Listen-in Audio and Motorized Varifocal
Lenses × 1
Black / 8
$1,897.15
Subtotal $2,383.64
Shipping $0.00
Estimated taxes $0.00
Total $2,383.64 USD
3
Customer information
Shipping address
Ryan Rossing
Eagle River Police Department
525 E Maple St
Eagle River WI 54521
United States
Billing address
Ryan Rossing
Eagle River Police Department
525 E Maple St
Eagle River WI 54521
United States
Location
525 E Maple St Eagle River Wisconsin
54521
Shipping method
Free Standard Shipping
$0.00
For inquiries, please contact your Lorex Partner Program account manager Diana Ferreira
dferreira@lorex.com. Otherwise, reach us at sales@lorex.com
Eagle River Police Department
10 YEAR TECHNOLOGY PLAN
T O T A L C O N T R A C T
$371,210.10
T OT A L A G E NC Y N EG O T IA T E D S AV I NG S
$160,830.06
Why Consolidate Into a 10-Y ear Plan Today
Strategic benefits of moving to a single 10-year agreement for all Axon solutions
Lock 2026 Pricing
Prevent future cost increases by locking in
current pricing for 10 years. Fixed annual
payments at $37,121.01 per year.
Standardize Hardware
Align with brand new hardware for AB4
cameras, Fleet 3 Advanced, and T10 across
the agency with coordinated refresh cycles.
Axon AI Efficiency Tools
Access to four time-saving tools including
Axon Assistant, Draft One, and Redaction
Assistant for enhanced officer productivity.
Simplify Administration
One contract, one annual invoice, one
renewal date. Eliminates multiple separate
agreements and reduces administrative
overhead.
Budget Certainty
Predictable, fixed annual cost structure with
no surprise fees or unexpected annual
increases during the term.
Total Savings
$160,830.06
Avg. Annual Savings
$16,083.01
Contract Term
120 Months
SOLUTION OVERVIEW
BODY WORN
CAMERA
6 Units
$79,531
Axon Body 4 cameras
Unlimited storage
4× TAP hardware refreshes
Extended warranty
FLEET
4 Vehicles
$106,560
Fleet 3 dual-camera kit
ALPR license
Real-time location
Deployment & install
TASER 10
6 Officers
$90,760.59
TASER 10 handles & holsters
VR training system
On-demand certification
Annual cartridge supply
TIME SAVING
SOFTWARE
6 Licenses
$84,999.60
Draft One AI report writing
Auto-Transcribe unlimited
Redaction Assistant (FREE)
Axon AI Assistant (FREE)
AI -POWERED TOOLS INCLUD ED
Draft One
Report Writing
Generates first-draft report
narratives based on audio
transcripts of digital evidence
and additional officer-narrated
details.
Saves multiple hours weekly.
Unlimited Auto-
Transcribe
Audio to Text
Turns audio into searchable
transcripts in minutes.
Boosts efficiency.
Redaction Assistant
Privacy & Compliance
AI-assisted redaction of faces,
license plates, and sensitive
information in BWC footage —
faster and more consistent
than manual review.
Included at no additional cost.
Axon Assistant
AI Voice Assistant
Translates conversations,
bridging language barriers
when a human interpreter is
not available.
Translating over 50 languages.
What Departments Are Saying
"We've seen 65-75% time savings just by being
able to push a button to get a transcript."
— Lt. Steve Ferrie Rowlett PD
The real-time translation tool is "invaluable for
our community engagement," as it "removes the
language barrier and allows us to provide better
service to all our residents immediately."
— Major Kim Fruit Tampa PD
"We're averaging 67% time savings in our report
writing. That's 67% of time that the officer is
getting back to go back into the community."
— Sgt. Bob Younger Fort Collins PD
EQUIPMENT BREAKDOWN
HARDWARE
Axon Body 4 Cameras 6
AB4 Multi-Bay 8-Bay Charging Dock 1
Fleet 3 Dual Camera Kits 4
Fleet Router (Ericsson 5G) 4
Axon Signal Vehicle Unit 4
TASER 10 Handles 6
TASER 10 Holsters (Safariland) 6
VR Headset (HTC Focus Vision) 1
VR Controllers (TASER + Handgun) 2
VR Tablet + Case 1
HALT Training Suit 1
Conductive Target + Frame 1
SOFTWARE & SERVICES
Axon Evidence – BWC Unlimited Storage 6
Axon Evidence – Fleet Unlimited Storage 8
Axon Evidence – Pro License 7
Axon Fleet ALPR License 4
Fleet Real-Time Location & Livestream 4
TASER Evidence.com License 7
TASER Data Science Program 6
Axon VR Full Access License 6
Draft One AI Report Writing 6
Auto-Transcribe Unlimited 6
Redaction Assistant License 6
Axon AI Assistant 6
Fleet ALPR API Integration 1
VR Implementation (1-Day) 1
R OI C ALC UL AT OR
Estimated time & cost savings based on average metrics from existing Axon users
6 Total Users $40.00 Hourly Rate 178 Work Days / Year 10 Years
Tool Hrs Saved / User / Day Total Hrs / Year Annual $ Savings / User
Draft One 0.50 89.0 $3,560
Auto-Transcribe 0.25 44.5 $1,780
Axon Assistant 0.25 44.5 $1,780
Policy Chat 0.25 44.5 $1,780
Redaction Assistant 0.15 26.7 $1,068
.Total Per User 1.40 249.2 $9,968 / user / year
Annual Savings — All 6 Users 8.40 1,495 $59,808 / year
Time Saved
1.40 hr / officer / day
Annual Cost Savings
$59,808 / year
Total Contract ROI
$598,080 over 10 years
*Time savings estimates are based on aggregated data from existing Axon customers. Inputs reflect Eagle River PD's provided h ourly rate and standard workdays. Individual results may vary.
CUSTOMIZED SCHEDULE
PAYMENT SCHEDULE
Date Total
January 2027 $37,121.01 Annual Payment 1
January 2028 $37,121.01 Annual Payment 2
Jan 2029–2036 $37,121.01 Annual Payments 3-10
TOTAL CONTRACT VALUE $371,210.10
DISCOUNTED AT 100%
Axon AI Assistant
6 licenses · $26,172 value
Redaction Assistant User License
6 licenses · $8,736.40 value
VR Implementation (1 -Day Add-On)
$3,500 value
PSO Virtual Training
$2,500 value
NEXT STEPS
June 9, 2026
Council Meeting
Budget approval and authorization to proceed with contract
execution
Upon Approval
Contract Execution
Finalize 10-year agreement and submit signed documents to Axon
January 1, 2027
Estimated Ship Date
Estimated hardware ship date following contract execution
Quote expires August 31, 2026 · Estimated contract start February 1, 2027
Non-Binding Budgetary Estimate
Page 1 Q-849520-46164DT
Q-849520-46164DT
Issued: 05/22/2026
Quote Expiration: 08/31/2026
Estimated Contract Start Date: 02/01/2027
Account Number: 115797
Payment Terms:
Mode of Delivery: AUTO-GND
Credit/Debit Amount: $0.00
SHIP TO BILL TO SALES REPRESENTATIVE PRIMARY CONTACT
525 E Maple Street, Eagle River, WI 54521
525 E Maple St
Eagle River,
WI
54521-8328
USA
Eagle River Police Department - WI
525 E Maple St
Eagle River
WI
54521-8328
USA
Email:
Dana Taylor
Phone:
Email: dataylor@axon.com
Fax:
Jordan Brault
Phone: 7154791941
Email: jobrau@vilascountywi.gov
Fax: (715) 477-2733
Quote Summary Discount Summary
Program Length 120 Months Average Savings Per Year $16,083.01
TOTAL COST $371,210.10
ESTIMATED TOTAL W/ TAX $372,784.29 TOTAL SAVINGS $160,830.06
Non-Binding Budgetary Estimate
Page 2 Q-849520-46164DT
Payment Summary
Date Subtotal Tax Total
Jan 2027 $37,121.01 $157.42 $37,278.43
Jan 2028 $37,121.01 $157.42 $37,278.43
Jan 2029 $37,121.01 $157.42 $37,278.43
Jan 2030 $37,121.01 $157.42 $37,278.43
Jan 2031 $37,121.01 $157.42 $37,278.43
Jan 2032 $37,121.01 $157.42 $37,278.43
Jan 2033 $37,121.01 $157.42 $37,278.43
Jan 2034 $37,121.01 $157.42 $37,278.43
Jan 2035 $37,121.01 $157.42 $37,278.43
Jan 2036 $37,121.01 $157.41 $37,278.42
Total $371,210.10 $1,574.19 $372,784.29
Non-Binding Budgetary Estimate
Page 3 Q-849520-46164DT
Quote Unbundled Price: $525,750.90
Quote List Price: $418,607.70
Quote Subtotal: $371,210.10
Pricing
All deliverables are detailed in Delivery Schedules section lower in proposal
Item Description Qty Term Unbundled List Price Net Price Subtotal Tax Total
Program
HWCNAB4 AB4 CONNECTED HARDWARE BUNDLE 6 120 $1,049.00 $6,294.00 $0.00 $6,294.00
BWCUwTAP10Yr BWC Unlimited with TAP 10YR 6 120 $157.40 $110.46 $110.46 $79,531.20 $0.00 $79,531.20
C00031 TASER 10 CERTIFICATION PRO PLAN 6 120 $197.12 $123.87 $123.87 $89,186.40 $1,574.19 $90,760.59
Fleet3A10Yr Fleet 3 Advanced 10 Year 4 120 $291.46 $248.53 $222.00 $106,560.00 $0.00 $106,560.00
A la Carte Hardware
H00002 AB4 Multi Bay Dock Bundle 1 $1,638.90 $1,638.90 $1,638.90 $0.00 $1,638.90
A la Carte Software
102011 AXON AI ASSISTANT 6 120 $36.35 $0.00 $0.00 $0.00 $0.00
73478 AXON EVIDENCE - REDACTION ASSISTANT USER
LICENSE 6 120 $12.12 $0.00 $0.00 $0.00 $0.00
85760 AXON AUTO-TRANSCRIBE - UNLIMITED SERVICE 6 120 $30.29 $30.29 $21,808.80 $0.00 $21,808.80
101283 AXON RECORDS - DRAFT ONE - AI-ASSISTED REPORT
WRITING 6 120 $78.76 $78.76 $56,707.20 $0.00 $56,707.20
ProLicense Pro License Bundle 1 120 $54.52 $54.03 $6,483.60 $0.00 $6,483.60
A la Carte Services
102531 PSO VIRTUAL TRAINING 1 $2,500.00 $0.00 $0.00 $0.00 $0.00
102603 VR IMPLEMENTATION (1-DAY) ADD-ON 1 $3,500.00 $0.00 $0.00 $0.00 $0.00
100159 AXON FLEET 3 - SERVICES - ALPR API INTEGRATION 1 $3,000.00 $3,000.00 $3,000.00 $0.00 $3,000.00
Total $371,210.10 $1,574.19 $372,784.29
Non-Binding Budgetary Estimate
Page 4 Q-849520-46164DT
Firearms and Ammunition Excise Tax
Sku Description Taxable Amount FAET Rate FAET Amount
100399 AXON TASER 10 - CARTRIDGE - LIVE $1,809.60 0.11 $199.06
100390 AXON TASER 10 - HANDLE - YELLOW CLASS 3R $8,860.32 0.1 $886.03
20018 AXON TASER - BATTERY PACK - TACTICAL $441.72 0.1 $44.17
100751 AXON TASER 10 - REPLACEMENT ACCESS PROGRAM - DUTY CARTRIDGE $3,479.28 0.11 $382.72
101755 AXON TASER 10 - MAGAZINE - LIVE DUTY BLACK V2 $622.08 0.1 $62.21
Total $1,574.19
Delivery Schedule
Hardware
Bundle Item Description QTY Shipping Location Estimated Delivery Date
AB4 CONNECTED HARDWARE BUNDLE 100147 AXON BODY 4 - CAMERA - NA US FIRST RESPONDER BLK
RAPIDLOCK 6 1 01/01/2027
AB4 CONNECTED HARDWARE BUNDLE 100466 AXON BODY 4 - CABLE - USB-C TO USB-C 7 1 01/01/2027
AB4 CONNECTED HARDWARE BUNDLE 100775 AXON BODY 4 - MAGNETIC DISCONNECT CABLE 7 1 01/01/2027
AB4 CONNECTED HARDWARE BUNDLE 74028 AXON BODY - MOUNT - WING CLIP RAPIDLOCK 7 1 01/01/2027
AB4 Multi Bay Dock Bundle 100206 AXON BODY 4 - 8 BAY DOCK 1 1 01/01/2027
AB4 Multi Bay Dock Bundle 70033 AXON - DOCK WALL MOUNT - BRACKET ASSY 1 1 01/01/2027
AB4 Multi Bay Dock Bundle 71019 AXON BODY - DOCK POWERCORD - NORTH AMERICA 1 1 01/01/2027
Fleet 3 Advanced 10 Year 101924 AXON FLEET - TAOGLAS ANT - 7-IN-1 4CELL 2WIFI 1GNSS INT 4 1 01/01/2027
Fleet 3 Advanced 10 Year 103346 AXON FLEET - ERICSSON R980-5GD-A+5YR NETCLOUD 4 1 01/01/2027
Fleet 3 Advanced 10 Year 70112 AXON SIGNAL - VEHICLE 4 1 01/01/2027
Fleet 3 Advanced 10 Year 72036 AXON FLEET 3 - STANDARD 2 CAMERA KIT 4 1 01/01/2027
TASER 10 CERTIFICATION PRO PLAN 100122 AXON VR - HEADSET - BATTERY 1 1 01/01/2027
TASER 10 CERTIFICATION PRO PLAN 100126 AXON VR - TACTICAL BAG 1 1 01/01/2027
TASER 10 CERTIFICATION PRO PLAN 100390 AXON TASER 10 - HANDLE - YELLOW CLASS 3R 6 2 01/01/2027
TASER 10 CERTIFICATION PRO PLAN 100394 AXON TASER 10 - MAGAZINE - HALT TRAINING BLUE 4 1 01/01/2027
TASER 10 CERTIFICATION PRO PLAN 100396 AXON TASER 10 - MAGAZINE - INERT RED 6 1 01/01/2027
TASER 10 CERTIFICATION PRO PLAN 100399 AXON TASER 10 - CARTRIDGE - LIVE 120 1 01/01/2027
TASER 10 CERTIFICATION PRO PLAN 100400 AXON TASER 10 - CARTRIDGE - HALT 60 1 01/01/2027
TASER 10 CERTIFICATION PRO PLAN 100401 AXON TASER 10 - CARTRIDGE - INERT 60 1 01/01/2027
TASER 10 CERTIFICATION PRO PLAN 100591 AXON TASER - CLEANING KIT 1 1 01/01/2027
TASER 10 CERTIFICATION PRO PLAN 100611 AXON TASER 10 - SAFARILAND HOLSTER - RH 6 1 01/01/2027
TASER 10 CERTIFICATION PRO PLAN 100623 ENHANCED HOOK-AND-LOOP TRAINING (HALT) SUIT (V2) 1 1 01/01/2027
TASER 10 CERTIFICATION PRO PLAN 100748 AXON VR - CONTROLLER - TASER 10 1 1 01/01/2027
TASER 10 CERTIFICATION PRO PLAN 100832 AXON VR - CONTROLLER - HANDGUN VR19H 1 1 01/01/2027
TASER 10 CERTIFICATION PRO PLAN 101122 AXON VR - HOLSTER - T10 SAFARILAND GRAY - RH 1 1 01/01/2027
TASER 10 CERTIFICATION PRO PLAN 101123 AXON VR - HOLSTER - T10 SAFARILAND GRAY - LH 1 1 01/01/2027
TASER 10 CERTIFICATION PRO PLAN 101294 AXON VR - TABLET 1 1 01/01/2027
TASER 10 CERTIFICATION PRO PLAN 101300 AXON VR - TABLET CASE 1 1 01/01/2027
TASER 10 CERTIFICATION PRO PLAN 101455 AXON TASER 10 - REPLACEMENT TOOL KIT - INTERPOSER
BUCKET 1 1 01/01/2027
TASER 10 CERTIFICATION PRO PLAN 101456 AXON TASER 10 - REPLACEMENT INTERPOSER BUCKET 1 1 01/01/2027
Non-Binding Budgetary Estimate
Page 5 Q-849520-46164DT
Hardware
Bundle Item Description QTY Shipping Location Estimated Delivery Date
TASER 10 CERTIFICATION PRO PLAN 101751 AXON VR - HEADSET - HTC FOCUS VISION 1 1 01/01/2027
TASER 10 CERTIFICATION PRO PLAN 101755 AXON TASER 10 - MAGAZINE - LIVE DUTY BLACK V2 6 1 01/01/2027
TASER 10 CERTIFICATION PRO PLAN 101757 AXON TASER 10 - MAGAZINE - LIVE TRAINING PURPLE V2 6 1 01/01/2027
TASER 10 CERTIFICATION PRO PLAN 102186 AXON TASER 10 - COMMAND BOX 1 1 01/01/2027
TASER 10 CERTIFICATION PRO PLAN 102389 AXON VR - MULTI-USER ROOM MARKER 2 1 01/01/2027
TASER 10 CERTIFICATION PRO PLAN 20018 AXON TASER - BATTERY PACK - TACTICAL 6 1 01/01/2027
TASER 10 CERTIFICATION PRO PLAN 20018 AXON TASER - BATTERY PACK - TACTICAL 1 1 01/01/2027
TASER 10 CERTIFICATION PRO PLAN 70033 AXON - DOCK WALL MOUNT - BRACKET ASSY 1 1 01/01/2027
TASER 10 CERTIFICATION PRO PLAN 71019 AXON BODY - DOCK POWERCORD - NORTH AMERICA 1 1 01/01/2027
TASER 10 CERTIFICATION PRO PLAN 74200 AXON TASER - DOCK - SIX BAY PLUS CORE 1 1 01/01/2027
TASER 10 CERTIFICATION PRO PLAN 80087 AXON TASER - TARGET - CONDUCTIVE PROFESSIONAL
RUGGEDIZED 1 1 01/01/2027
TASER 10 CERTIFICATION PRO PLAN 80090 AXON TASER - TARGET FRAME - PROFESSIONAL 27.5 IN X 75
IN 1 1 01/01/2027
TASER 10 CERTIFICATION PRO PLAN 100400 AXON TASER 10 - CARTRIDGE - HALT 50 1 01/01/2028
TASER 10 CERTIFICATION PRO PLAN 100400 AXON TASER 10 - CARTRIDGE - HALT 50 1 01/01/2029
BWC Unlimited with TAP 10YR 73309 AXON BODY - TAP REFRESH 1 - CAMERA 6 1 07/01/2029
BWC Unlimited with TAP 10YR 73689 AXON BODY - TAP REFRESH 1 - DOCK MULTI BAY 1 1 07/01/2029
TASER 10 CERTIFICATION PRO PLAN 100210 AXON VR - TAP REFRESH 1 - TABLET 1 1 07/01/2029
TASER 10 CERTIFICATION PRO PLAN 101009 AXON VR - TAP REFRESH 1 - HANDGUN CONTROLLER 1 1 07/01/2029
TASER 10 CERTIFICATION PRO PLAN 101012 AXON VR - TAP REFRESH 1 - TASER CONTROLLER 1 1 07/01/2029
TASER 10 CERTIFICATION PRO PLAN 20373 AXON VR - TAP REFRESH 1 - HEADSET 1 1 07/01/2029
TASER 10 CERTIFICATION PRO PLAN 100400 AXON TASER 10 - CARTRIDGE - HALT 50 1 01/01/2030
TASER 10 CERTIFICATION PRO PLAN 100400 AXON TASER 10 - CARTRIDGE - HALT 50 1 01/01/2031
BWC Unlimited with TAP 10YR 73310 AXON BODY - TAP REFRESH 2 - CAMERA 6 1 01/01/2032
BWC Unlimited with TAP 10YR 73688 AXON BODY - TAP REFRESH 2 - DOCK MULTI BAY 1 1 01/01/2032
Fleet 3 Advanced 10 Year 72040 AXON FLEET - TAP REFRESH 1 - 2 CAMERA KIT 4 1 01/01/2032
TASER 10 CERTIFICATION PRO PLAN 100211 AXON VR - TAP REFRESH 2 - TABLET 1 1 01/01/2032
TASER 10 CERTIFICATION PRO PLAN 101010 AXON VR - TAP REFRESH 2 - HANDGUN CONTROLLER 1 1 01/01/2032
TASER 10 CERTIFICATION PRO PLAN 101013 AXON VR - TAP REFRESH 2 - TASER CONTROLLER 1 1 01/01/2032
TASER 10 CERTIFICATION PRO PLAN 20242 AXON TASER - CERTIFICATION PROGRAM YEAR 6-10
HARDWARE 6 1 01/01/2032
TASER 10 CERTIFICATION PRO PLAN 20374 AXON VR - TAP REFRESH 2 - HEADSET 1 1 01/01/2032
BWC Unlimited with TAP 10YR 73345 AXON BODY - TAP REFRESH 3 - CAMERA 6 1 07/01/2034
BWC Unlimited with TAP 10YR 73347 AXON BODY - TAP REFRESH 3 - DOCK MULTI BAY 1 1 07/01/2034
TASER 10 CERTIFICATION PRO PLAN 100212 AXON VR - TAP REFRESH 3 - TABLET 1 1 07/01/2034
TASER 10 CERTIFICATION PRO PLAN 101011 AXON VR - TAP REFRESH 3 - HANDGUN CONTROLLER 1 1 07/01/2034
TASER 10 CERTIFICATION PRO PLAN 101014 AXON VR - TAP REFRESH 3 - TASER CONTROLLER 1 1 07/01/2034
TASER 10 CERTIFICATION PRO PLAN 20375 AXON VR - TAP REFRESH 3 - HEADSET 1 1 07/01/2034
BWC Unlimited with TAP 10YR 73346 AXON BODY - TAP REFRESH 4 - CAMERA 6 1 01/01/2037
BWC Unlimited with TAP 10YR 73348 AXON BODY - TAP REFRESH 4 - DOCK MULTI BAY 1 1 01/01/2037
Fleet 3 Advanced 10 Year 100092 AXON FLEET - TAP REFRESH 2 - 2 CAMERA KIT 4 1 01/01/2037
Software
Bundle Item Description QTY Estimated Start Date Estimated End Date
BWC Unlimited with TAP 10YR 73686 AXON EVIDENCE - STORAGE - UNLIMITED (AXON DEVICE) 6 02/01/2027 01/31/2037
BWC Unlimited with TAP 10YR 73746 AXON EVIDENCE - ECOM LICENSE - PRO 6 02/01/2027 01/31/2037
Fleet 3 Advanced 10 Year 80400 AXON EVIDENCE - FLEET VEHICLE LICENSE 4 02/01/2027 01/31/2037
Fleet 3 Advanced 10 Year 80401 AXON FLEET 3 - ALPR LICENSE - 1 CAMERA 4 02/01/2027 01/31/2037
Fleet 3 Advanced 10 Year 80402 AXON FLEET - LICENSE - REAL-TIME LOCATION, ALERTS, &
LIVESTREAM 4 02/01/2027 01/31/2037
Non-Binding Budgetary Estimate
Page 6 Q-849520-46164DT
Software
Bundle Item Description QTY Estimated Start Date Estimated End Date
Fleet 3 Advanced 10 Year 80410 AXON EVIDENCE - STORAGE - FLEET 1 CAMERA UNLIMITED 8 02/01/2027 01/31/2037
Pro License Bundle 73683 AXON EVIDENCE - STORAGE - 10GB A LA CARTE 3 02/01/2027 01/31/2037
Pro License Bundle 73746 AXON EVIDENCE - ECOM LICENSE - PRO 1 02/01/2027 01/31/2037
TASER 10 CERTIFICATION PRO PLAN 101180 AXON TASER - DATA SCIENCE PROGRAM 6 02/01/2027 01/31/2037
TASER 10 CERTIFICATION PRO PLAN 20248 AXON TASER - EVIDENCE.COM LICENSE 6 02/01/2027 01/31/2037
TASER 10 CERTIFICATION PRO PLAN 20248 AXON TASER - EVIDENCE.COM LICENSE 1 02/01/2027 01/31/2037
TASER 10 CERTIFICATION PRO PLAN 20370 AXON VR - USER ACCESS - FULL VR 6 02/01/2027 01/31/2037
A la Carte 101283 AXON RECORDS - DRAFT ONE - AI-ASSISTED REPORT
WRITING 6 02/01/2027 01/31/2037
A la Carte 102011 AXON AI ASSISTANT 6 02/01/2027 01/31/2037
A la Carte 73478 AXON EVIDENCE - REDACTION ASSISTANT USER LICENSE 6 02/01/2027 01/31/2037
A la Carte 85760 AXON AUTO-TRANSCRIBE - UNLIMITED SERVICE 6 02/01/2027 01/31/2037
Services
Bundle Item Description QTY
Fleet 3 Advanced 10 Year 73391 AXON FLEET 3 - DEPLOYMENT PER VEHICLE - NOT OVERSIZED 4
Fleet 3 Advanced 10 Year 73392 AXON FLEET 3 - INSTALLATION - UPGRADE (PER VEHICLE) 4
TASER 10 CERTIFICATION PRO PLAN 100751 AXON TASER 10 - REPLACEMENT ACCESS PROGRAM - DUTY CARTRIDGE 6
TASER 10 CERTIFICATION PRO PLAN 101193 AXON TASER - ON DEMAND CERTIFICATION 6
A la Carte 100159 AXON FLEET 3 - SERVICES - ALPR API INTEGRATION 1
A la Carte 102531 PSO VIRTUAL TRAINING 1
A la Carte 102603 VR IMPLEMENTATION (1-DAY) ADD-ON 1
Warranties
Bundle Item Description QTY Estimated Start Date Estimated End Date
BWC Unlimited with TAP 10YR 80464 AXON BODY - TAP WARRANTY - CAMERA 6 01/01/2028 01/31/2037
BWC Unlimited with TAP 10YR 80465 AXON BODY - TAP WARRANTY - MULTI BAY DOCK 1 01/01/2028 01/31/2037
Fleet 3 Advanced 10 Year 80379 AXON SIGNAL - EXT WARRANTY - SIGNAL UNIT 4 01/01/2028 01/31/2037
Fleet 3 Advanced 10 Year 80495 AXON FLEET 3 - EXT WARRANTY - 2 CAMERA KIT 4 01/01/2028 01/31/2037
TASER 10 CERTIFICATION PRO PLAN 100197 AXON VR - EXT WARRANTY - HEADSET 1 01/01/2028 01/31/2037
TASER 10 CERTIFICATION PRO PLAN 100213 AXON VR - EXT WARRANTY - TABLET 1 01/01/2028 01/31/2037
TASER 10 CERTIFICATION PRO PLAN 100704 AXON TASER 10 - EXT WARRANTY - HANDLE 6 01/01/2028 01/31/2037
TASER 10 CERTIFICATION PRO PLAN 101007 AXON VR - EXT WARRANTY - TASER CONTROLLER 1 01/01/2028 01/31/2037
TASER 10 CERTIFICATION PRO PLAN 101008 AXON VR - EXT WARRANTY - HANDGUN CONTROLLER 1 01/01/2028 01/31/2037
TASER 10 CERTIFICATION PRO PLAN 80374 AXON TASER - EXT WARRANTY - BATTERY PACK T7/T10 1 01/01/2028 01/31/2037
TASER 10 CERTIFICATION PRO PLAN 80374 AXON TASER - EXT WARRANTY - BATTERY PACK T7/T10 6 01/01/2028 01/31/2037
TASER 10 CERTIFICATION PRO PLAN 80396 AXON TASER - EXT WARRANTY - DOCK SIX BAY T7/T10 1 01/01/2028 01/31/2037
Non-Binding Budgetary Estimate
Page 7 Q-849520-46164DT
Shipping Locations
Location Number Street City State Zip Country
1 525 E Maple St Eagle River WI 54521-8328 USA
2 525 E Maple St Eagle River WI 54521-8328 USA
Payment Details
Jan 2027
Invoice Plan Item Description Qty Subtotal Tax Total
Annual Payment 1 100159 AXON FLEET 3 - SERVICES - ALPR API INTEGRATION 1 $300.00 $0.00 $300.00
Annual Payment 1 101283 AXON RECORDS - DRAFT ONE - AI-ASSISTED REPORT WRITING 6 $5,670.73 $0.00 $5,670.73
Annual Payment 1 102011 AXON AI ASSISTANT 6 $0.00 $0.00 $0.00
Annual Payment 1 102531 PSO VIRTUAL TRAINING 1 $0.00 $0.00 $0.00
Annual Payment 1 102603 VR IMPLEMENTATION (1-DAY) ADD-ON 1 $0.00 $0.00 $0.00
Annual Payment 1 73478 AXON EVIDENCE - REDACTION ASSISTANT USER LICENSE 6 $0.00 $0.00 $0.00
Annual Payment 1 85760 AXON AUTO-TRANSCRIBE - UNLIMITED SERVICE 6 $2,180.88 $0.00 $2,180.88
Annual Payment 1 BWCUwTAP10Yr BWC Unlimited with TAP 10YR 6 $7,953.12 $0.00 $7,953.12
Annual Payment 1 C00031 TASER 10 CERTIFICATION PRO PLAN 6 $8,918.63 $157.42 $9,076.05
Annual Payment 1 Fleet3A10Yr Fleet 3 Advanced 10 Year 4 $10,656.00 $0.00 $10,656.00
Annual Payment 1 H00002 AB4 Multi Bay Dock Bundle 1 $163.89 $0.00 $163.89
Annual Payment 1 HWCNAB4 AB4 CONNECTED HARDWARE BUNDLE 6 $629.40 $0.00 $629.40
Annual Payment 1 ProLicense Pro License Bundle 1 $648.36 $0.00 $648.36
Total $37,121.01 $157.42 $37,278.43
Feb 2027
Invoice Plan Item Description Qty Subtotal Tax Total
Invoice Upon Fulfillment C00031 TASER 10 CERTIFICATION PRO PLAN 6 $0.00 $0.00 $0.00
Total $0.00 $0.00 $0.00
Jan 2028
Invoice Plan Item Description Qty Subtotal Tax Total
Annual Payment 2 100159 AXON FLEET 3 - SERVICES - ALPR API INTEGRATION 1 $300.00 $0.00 $300.00
Annual Payment 2 101283 AXON RECORDS - DRAFT ONE - AI-ASSISTED REPORT WRITING 6 $5,670.73 $0.00 $5,670.73
Annual Payment 2 102011 AXON AI ASSISTANT 6 $0.00 $0.00 $0.00
Annual Payment 2 102531 PSO VIRTUAL TRAINING 1 $0.00 $0.00 $0.00
Annual Payment 2 102603 VR IMPLEMENTATION (1-DAY) ADD-ON 1 $0.00 $0.00 $0.00
Annual Payment 2 73478 AXON EVIDENCE - REDACTION ASSISTANT USER LICENSE 6 $0.00 $0.00 $0.00
Annual Payment 2 85760 AXON AUTO-TRANSCRIBE - UNLIMITED SERVICE 6 $2,180.88 $0.00 $2,180.88
Annual Payment 2 BWCUwTAP10Yr BWC Unlimited with TAP 10YR 6 $7,953.12 $0.00 $7,953.12
Annual Payment 2 C00031 TASER 10 CERTIFICATION PRO PLAN 6 $8,918.63 $157.42 $9,076.05
Annual Payment 2 Fleet3A10Yr Fleet 3 Advanced 10 Year 4 $10,656.00 $0.00 $10,656.00
Annual Payment 2 H00002 AB4 Multi Bay Dock Bundle 1 $163.89 $0.00 $163.89
Annual Payment 2 HWCNAB4 AB4 CONNECTED HARDWARE BUNDLE 6 $629.40 $0.00 $629.40
Annual Payment 2 ProLicense Pro License Bundle 1 $648.36 $0.00 $648.36
Total $37,121.01 $157.42 $37,278.43
Non-Binding Budgetary Estimate
Page 8 Q-849520-46164DT
Jan 2029
Invoice Plan Item Description Qty Subtotal Tax Total
Annual Payment 3 100159 AXON FLEET 3 - SERVICES - ALPR API INTEGRATION 1 $300.00 $0.00 $300.00
Annual Payment 3 101283 AXON RECORDS - DRAFT ONE - AI-ASSISTED REPORT WRITING 6 $5,670.73 $0.00 $5,670.73
Annual Payment 3 102011 AXON AI ASSISTANT 6 $0.00 $0.00 $0.00
Annual Payment 3 102531 PSO VIRTUAL TRAINING 1 $0.00 $0.00 $0.00
Annual Payment 3 102603 VR IMPLEMENTATION (1-DAY) ADD-ON 1 $0.00 $0.00 $0.00
Annual Payment 3 73478 AXON EVIDENCE - REDACTION ASSISTANT USER LICENSE 6 $0.00 $0.00 $0.00
Annual Payment 3 85760 AXON AUTO-TRANSCRIBE - UNLIMITED SERVICE 6 $2,180.88 $0.00 $2,180.88
Annual Payment 3 BWCUwTAP10Yr BWC Unlimited with TAP 10YR 6 $7,953.12 $0.00 $7,953.12
Annual Payment 3 C00031 TASER 10 CERTIFICATION PRO PLAN 6 $8,918.63 $157.42 $9,076.05
Annual Payment 3 Fleet3A10Yr Fleet 3 Advanced 10 Year 4 $10,656.00 $0.00 $10,656.00
Annual Payment 3 H00002 AB4 Multi Bay Dock Bundle 1 $163.89 $0.00 $163.89
Annual Payment 3 HWCNAB4 AB4 CONNECTED HARDWARE BUNDLE 6 $629.40 $0.00 $629.40
Annual Payment 3 ProLicense Pro License Bundle 1 $648.36 $0.00 $648.36
Total $37,121.01 $157.42 $37,278.43
Jan 2030
Invoice Plan Item Description Qty Subtotal Tax Total
Annual Payment 4 100159 AXON FLEET 3 - SERVICES - ALPR API INTEGRATION 1 $300.00 $0.00 $300.00
Annual Payment 4 101283 AXON RECORDS - DRAFT ONE - AI-ASSISTED REPORT WRITING 6 $5,670.73 $0.00 $5,670.73
Annual Payment 4 102011 AXON AI ASSISTANT 6 $0.00 $0.00 $0.00
Annual Payment 4 102531 PSO VIRTUAL TRAINING 1 $0.00 $0.00 $0.00
Annual Payment 4 102603 VR IMPLEMENTATION (1-DAY) ADD-ON 1 $0.00 $0.00 $0.00
Annual Payment 4 73478 AXON EVIDENCE - REDACTION ASSISTANT USER LICENSE 6 $0.00 $0.00 $0.00
Annual Payment 4 85760 AXON AUTO-TRANSCRIBE - UNLIMITED SERVICE 6 $2,180.88 $0.00 $2,180.88
Annual Payment 4 BWCUwTAP10Yr BWC Unlimited with TAP 10YR 6 $7,953.12 $0.00 $7,953.12
Annual Payment 4 C00031 TASER 10 CERTIFICATION PRO PLAN 6 $8,918.63 $157.42 $9,076.05
Annual Payment 4 Fleet3A10Yr Fleet 3 Advanced 10 Year 4 $10,656.00 $0.00 $10,656.00
Annual Payment 4 H00002 AB4 Multi Bay Dock Bundle 1 $163.89 $0.00 $163.89
Annual Payment 4 HWCNAB4 AB4 CONNECTED HARDWARE BUNDLE 6 $629.40 $0.00 $629.40
Annual Payment 4 ProLicense Pro License Bundle 1 $648.36 $0.00 $648.36
Total $37,121.01 $157.42 $37,278.43
Jan 2031
Invoice Plan Item Description Qty Subtotal Tax Total
Annual Payment 5 100159 AXON FLEET 3 - SERVICES - ALPR API INTEGRATION 1 $300.00 $0.00 $300.00
Annual Payment 5 101283 AXON RECORDS - DRAFT ONE - AI-ASSISTED REPORT WRITING 6 $5,670.73 $0.00 $5,670.73
Annual Payment 5 102011 AXON AI ASSISTANT 6 $0.00 $0.00 $0.00
Annual Payment 5 102531 PSO VIRTUAL TRAINING 1 $0.00 $0.00 $0.00
Annual Payment 5 102603 VR IMPLEMENTATION (1-DAY) ADD-ON 1 $0.00 $0.00 $0.00
Annual Payment 5 73478 AXON EVIDENCE - REDACTION ASSISTANT USER LICENSE 6 $0.00 $0.00 $0.00
Annual Payment 5 85760 AXON AUTO-TRANSCRIBE - UNLIMITED SERVICE 6 $2,180.88 $0.00 $2,180.88
Annual Payment 5 BWCUwTAP10Yr BWC Unlimited with TAP 10YR 6 $7,953.12 $0.00 $7,953.12
Annual Payment 5 C00031 TASER 10 CERTIFICATION PRO PLAN 6 $8,918.63 $157.42 $9,076.05
Annual Payment 5 Fleet3A10Yr Fleet 3 Advanced 10 Year 4 $10,656.00 $0.00 $10,656.00
Annual Payment 5 H00002 AB4 Multi Bay Dock Bundle 1 $163.89 $0.00 $163.89
Annual Payment 5 HWCNAB4 AB4 CONNECTED HARDWARE BUNDLE 6 $629.40 $0.00 $629.40
Annual Payment 5 ProLicense Pro License Bundle 1 $648.36 $0.00 $648.36
Total $37,121.01 $157.42 $37,278.43
Non-Binding Budgetary Estimate
Page 9 Q-849520-46164DT
Jan 2032
Invoice Plan Item Description Qty Subtotal Tax Total
Annual Payment 6 100159 AXON FLEET 3 - SERVICES - ALPR API INTEGRATION 1 $300.00 $0.00 $300.00
Annual Payment 6 101283 AXON RECORDS - DRAFT ONE - AI-ASSISTED REPORT WRITING 6 $5,670.73 $0.00 $5,670.73
Annual Payment 6 102011 AXON AI ASSISTANT 6 $0.00 $0.00 $0.00
Annual Payment 6 102531 PSO VIRTUAL TRAINING 1 $0.00 $0.00 $0.00
Annual Payment 6 102603 VR IMPLEMENTATION (1-DAY) ADD-ON 1 $0.00 $0.00 $0.00
Annual Payment 6 73478 AXON EVIDENCE - REDACTION ASSISTANT USER LICENSE 6 $0.00 $0.00 $0.00
Annual Payment 6 85760 AXON AUTO-TRANSCRIBE - UNLIMITED SERVICE 6 $2,180.88 $0.00 $2,180.88
Annual Payment 6 BWCUwTAP10Yr BWC Unlimited with TAP 10YR 6 $7,953.12 $0.00 $7,953.12
Annual Payment 6 C00031 TASER 10 CERTIFICATION PRO PLAN 6 $8,918.63 $157.42 $9,076.05
Annual Payment 6 Fleet3A10Yr Fleet 3 Advanced 10 Year 4 $10,656.00 $0.00 $10,656.00
Annual Payment 6 H00002 AB4 Multi Bay Dock Bundle 1 $163.89 $0.00 $163.89
Annual Payment 6 HWCNAB4 AB4 CONNECTED HARDWARE BUNDLE 6 $629.40 $0.00 $629.40
Annual Payment 6 ProLicense Pro License Bundle 1 $648.36 $0.00 $648.36
Total $37,121.01 $157.42 $37,278.43
Jan 2033
Invoice Plan Item Description Qty Subtotal Tax Total
Annual Payment 7 100159 AXON FLEET 3 - SERVICES - ALPR API INTEGRATION 1 $300.00 $0.00 $300.00
Annual Payment 7 101283 AXON RECORDS - DRAFT ONE - AI-ASSISTED REPORT WRITING 6 $5,670.73 $0.00 $5,670.73
Annual Payment 7 102011 AXON AI ASSISTANT 6 $0.00 $0.00 $0.00
Annual Payment 7 102531 PSO VIRTUAL TRAINING 1 $0.00 $0.00 $0.00
Annual Payment 7 102603 VR IMPLEMENTATION (1-DAY) ADD-ON 1 $0.00 $0.00 $0.00
Annual Payment 7 73478 AXON EVIDENCE - REDACTION ASSISTANT USER LICENSE 6 $0.00 $0.00 $0.00
Annual Payment 7 85760 AXON AUTO-TRANSCRIBE - UNLIMITED SERVICE 6 $2,180.88 $0.00 $2,180.88
Annual Payment 7 BWCUwTAP10Yr BWC Unlimited with TAP 10YR 6 $7,953.12 $0.00 $7,953.12
Annual Payment 7 C00031 TASER 10 CERTIFICATION PRO PLAN 6 $8,918.63 $157.42 $9,076.05
Annual Payment 7 Fleet3A10Yr Fleet 3 Advanced 10 Year 4 $10,656.00 $0.00 $10,656.00
Annual Payment 7 H00002 AB4 Multi Bay Dock Bundle 1 $163.89 $0.00 $163.89
Annual Payment 7 HWCNAB4 AB4 CONNECTED HARDWARE BUNDLE 6 $629.40 $0.00 $629.40
Annual Payment 7 ProLicense Pro License Bundle 1 $648.36 $0.00 $648.36
Total $37,121.01 $157.42 $37,278.43
Jan 2034
Invoice Plan Item Description Qty Subtotal Tax Total
Annual Payment 8 100159 AXON FLEET 3 - SERVICES - ALPR API INTEGRATION 1 $300.00 $0.00 $300.00
Annual Payment 8 101283 AXON RECORDS - DRAFT ONE - AI-ASSISTED REPORT WRITING 6 $5,670.73 $0.00 $5,670.73
Annual Payment 8 102011 AXON AI ASSISTANT 6 $0.00 $0.00 $0.00
Annual Payment 8 102531 PSO VIRTUAL TRAINING 1 $0.00 $0.00 $0.00
Annual Payment 8 102603 VR IMPLEMENTATION (1-DAY) ADD-ON 1 $0.00 $0.00 $0.00
Annual Payment 8 73478 AXON EVIDENCE - REDACTION ASSISTANT USER LICENSE 6 $0.00 $0.00 $0.00
Annual Payment 8 85760 AXON AUTO-TRANSCRIBE - UNLIMITED SERVICE 6 $2,180.88 $0.00 $2,180.88
Annual Payment 8 BWCUwTAP10Yr BWC Unlimited with TAP 10YR 6 $7,953.12 $0.00 $7,953.12
Annual Payment 8 C00031 TASER 10 CERTIFICATION PRO PLAN 6 $8,918.63 $157.42 $9,076.05
Annual Payment 8 Fleet3A10Yr Fleet 3 Advanced 10 Year 4 $10,656.00 $0.00 $10,656.00
Annual Payment 8 H00002 AB4 Multi Bay Dock Bundle 1 $163.89 $0.00 $163.89
Annual Payment 8 HWCNAB4 AB4 CONNECTED HARDWARE BUNDLE 6 $629.40 $0.00 $629.40
Annual Payment 8 ProLicense Pro License Bundle 1 $648.36 $0.00 $648.36
Total $37,121.01 $157.42 $37,278.43
Non-Binding Budgetary Estimate
Page 10 Q-849520-46164DT
Jan 2035
Invoice Plan Item Description Qty Subtotal Tax Total
Annual Payment 9 100159 AXON FLEET 3 - SERVICES - ALPR API INTEGRATION 1 $300.00 $0.00 $300.00
Annual Payment 9 101283 AXON RECORDS - DRAFT ONE - AI-ASSISTED REPORT WRITING 6 $5,670.72 $0.00 $5,670.72
Annual Payment 9 102011 AXON AI ASSISTANT 6 $0.00 $0.00 $0.00
Annual Payment 9 102531 PSO VIRTUAL TRAINING 1 $0.00 $0.00 $0.00
Annual Payment 9 102603 VR IMPLEMENTATION (1-DAY) ADD-ON 1 $0.00 $0.00 $0.00
Annual Payment 9 73478 AXON EVIDENCE - REDACTION ASSISTANT USER LICENSE 6 $0.00 $0.00 $0.00
Annual Payment 9 85760 AXON AUTO-TRANSCRIBE - UNLIMITED SERVICE 6 $2,180.88 $0.00 $2,180.88
Annual Payment 9 BWCUwTAP10Yr BWC Unlimited with TAP 10YR 6 $7,953.12 $0.00 $7,953.12
Annual Payment 9 C00031 TASER 10 CERTIFICATION PRO PLAN 6 $8,918.63 $157.42 $9,076.05
Annual Payment 9 Fleet3A10Yr Fleet 3 Advanced 10 Year 4 $10,656.01 $0.00 $10,656.01
Annual Payment 9 H00002 AB4 Multi Bay Dock Bundle 1 $163.89 $0.00 $163.89
Annual Payment 9 HWCNAB4 AB4 CONNECTED HARDWARE BUNDLE 6 $629.40 $0.00 $629.40
Annual Payment 9 ProLicense Pro License Bundle 1 $648.36 $0.00 $648.36
Total $37,121.01 $157.42 $37,278.43
Jan 2036
Invoice Plan Item Description Qty Subtotal Tax Total
Annual Payment 10 100159 AXON FLEET 3 - SERVICES - ALPR API INTEGRATION 1 $300.00 $0.00 $300.00
Annual Payment 10 101283 AXON RECORDS - DRAFT ONE - AI-ASSISTED REPORT WRITING 6 $5,670.72 $0.00 $5,670.72
Annual Payment 10 102011 AXON AI ASSISTANT 6 $0.00 $0.00 $0.00
Annual Payment 10 102531 PSO VIRTUAL TRAINING 1 $0.00 $0.00 $0.00
Annual Payment 10 102603 VR IMPLEMENTATION (1-DAY) ADD-ON 1 $0.00 $0.00 $0.00
Annual Payment 10 73478 AXON EVIDENCE - REDACTION ASSISTANT USER LICENSE 6 $0.00 $0.00 $0.00
Annual Payment 10 85760 AXON AUTO-TRANSCRIBE - UNLIMITED SERVICE 6 $2,180.88 $0.00 $2,180.88
Annual Payment 10 BWCUwTAP10Yr BWC Unlimited with TAP 10YR 6 $7,953.12 $0.00 $7,953.12
Annual Payment 10 C00031 TASER 10 CERTIFICATION PRO PLAN 6 $8,918.63 $157.41 $9,076.04
Annual Payment 10 Fleet3A10Yr Fleet 3 Advanced 10 Year 4 $10,656.01 $0.00 $10,656.01
Annual Payment 10 H00002 AB4 Multi Bay Dock Bundle 1 $163.89 $0.00 $163.89
Annual Payment 10 HWCNAB4 AB4 CONNECTED HARDWARE BUNDLE 6 $629.40 $0.00 $629.40
Annual Payment 10 ProLicense Pro License Bundle 1 $648.36 $0.00 $648.36
Total $37,121.01 $157.41 $37,278.42
Non-Binding Budgetary Estimate
Page 11 Q-849520-46164DT
This Rough Order of Magnitude estimate is being provided for budgetary and planning purposes only. It is non-binding and is not considered a contractable offer for sale of Axon
goods or services.
Tax is estimated based on rates applicable at date of quote and subject to change at time of invoicing. If a tax exemption certificate should be applied, please submit
prior to invoicing.
Exceptions to Standard Terms and Conditions
Rewrite Estimates
Estimated Amounts and Contract Terminations. Any amounts stated as due under existing or terminated contracts — including contract transfer balances carried forward to
new or pending contracts — are estimates based on payments received as of the calculation date. These estimates may be adjusted if new contracts are not executed on the
anticipated dates or if expected payments are not made.
Refresh Shipment Timing
Technology Assurance Plan (TAP) Refresh Prior to Renewal. For Customers with expiring agreements that include TAP refresh rights, Axon may, in its discretion, ship
refresh hardware under the existing contract while renewal or replacement agreements are in progress. Any such shipments will be deemed made under the terms of the
existing contract until the new contract is fully executed, after which any applicable updates, fees, or adjustments will apply.
Shipment Timing
Shipment Variance. Estimated shipment dates are provided for planning purposes only and are not guarantees. Axon may ship hardware before or after the estimated
shipment date, and failure to meet an estimated shipment date will not, by itself, constitute a breach, provided Axon uses commercially reasonable efforts to meet estimated
shipment dates.
Non-Binding Budgetary Estimate
Page 12 Q-849520-46164DT
Safe biking practices
six-footapart
z Maintain at least a six-foot distance from others.
When you can’t maintain a safe distance, wear a face mask
to help protect yourself and others.
z Be visible. If you can’t see the driver, they can’t see you.
Use extra caution when passing trucks, buses or approaching
an intersection alongside a large vehicle.
z Be seen when stopped.
At red lights, stop slightly ahead of a waiting vehicle.
Avoid the driver’s blind spot.
z Obey traffic laws, signs and signals.
Running a red light or stop sign can result in a serious crash
with other vehicles or pedestrians.
z Be aware of your surroundings.
If using earphones, wear only one while riding. Check behind you,
especially when changing lanes. Watch for opening car doors.
z Ride on the road, bike lane, paved shoulder or path.
Follow the rules of the road. Ride to the right in the direction of
traffic. Watch out for others and be alert for hazards that may result
in a crash such as rocks, potholes, utility grates and train tracks.
z Enhance visibility with proper lighting.
Use a white headlight and a red taillight
z Wear a helmet.
Wearing a helmet will significantly reduce your risk
of being killed or seriously injured in a crash.
z Avoid getting “doored”
Riding close to parked cars leaves
cyclists vulnerable to car doors
that open unexpectedly.
DO
◗ Be alert and watch parked
vehicles carefully.
◗ Ride in a straight line and
maintain at least three feet of
distance from parked vehicles.
◗ Watch vehicle tail lights to
anticipate driver actions and for
exiting passengers.
DON’T
◗ Swerve back and forth around
vehicles.
z Safety at intersections
When approaching intersections
where cyclists and turning
vehicles merge:
DO
◗ Look for turning traffic.
◗ Take the full lane as necessary.
DON’T
◗ Hug the curb or pass on the
curbside of a turning vehicle.
If vehicles are turning in front
of you, move away from the
direction of the turn.
WisDOT
102020
1 | Page
City Administrator’s Report
June 5, 2026
Submitted by Robin Ginner
Admin/General
I’ve received a request for information on how to detach from the City (i.e. : reverse an
annexation), so I’ve done some research and put together a document to explain how that
procedure would happen. The most important piece is that both COER and Lincoln would have to
approve it by a ¾ vote. The procedure is documented in Appendix B, attached.
The League of Wisconsin Municipalities appointed me as their representative to the
Incorporation Review Board for the State of Wisconsin. This board is a state agency within
the Wisconsin Department of Administration (DOA) responsible for reviewing and approving
proposals to incorporate new cities or villages from unincorporated town territory. The board
evaluates petitions based on statutory standard s, including whether the territory is reasonably
compact and homogeneous, meets population and density requ irements, and serves the public
interest. In reviewing the past several years, it appears to evaluate 1-2 applications per year.
Vandalism – The vandalism continues at the Farmers Market. One of the porta -johns was
substantially damaged and needed to be replaced, so ERRP took care of that. Detective Rossing
is looking into an 8-camera system for the market area, which will also capture traffic on north
Railroad and Michigan Streets. The quote came in just under $2,400 and will be on the agenda
for approval. I have Chief Salvinski looking into what budget line item can accommodate the
expense.
IT/Phones/Internet – It’s been a slog, but we got the rest of the connections completed in City
Hall. I’ve requested a list of what we’re still be ing billed for at Norvado so I can cancel
applicable accounts. We don’t have Frontier internet at the Golf Course or Airport yet, so those
services will remain on Norvado until the fiber can be run. Otherwise, I believe the rest of the
transition for our phone and internet is complete.
The next big project is getting the Police Department off the Vilas County system. Tyler has
been working with IT Strategies on that project and anticipating progress in the next month.
The PD website needs to be redone in this entire process as well. I requested a subdomain
for our .GOV web address, so in the future the PD will be part of our existing website
infrastructure. I will work with Tyler on the website transition.
We’ve been working with Frontier to get our billing straightened out, and I finally got a
response with an amount of credits due to the City. Jennifer from L&W and I are comparing
the sum to our notes and will get back to Frontier with whether we feel this is an appropriate
amount.
I’m also still waiting on an update on the Cybersecurity Grant application that I submitted
in spring. My understanding was that we were supposed be notified either in May or June. I
will see if I can follow up on that request as well.
2 | Page
Departments /Committees/Commissions
Golf Course – It has been blissfully silent. No issues whatsoever with the golf course restaurant
so far this season. Kyle continues to make improvements to the course, and Tony and his crew
are keeping things moving smoothly at the Clubhouse.
Similar to the class action settlement claim for Visa/Mastercard I reported on previously ,
another settlement has been reached for Discover Card. I’ve submitted our claim on behalf of
the golf course, and hopefully we’ll see something from this one as well.
Planning Commission/Comprehensive Plan – The commission met to discuss a continuation of
the public hearing on Amerco Real Estate Company/U -Haul’s request for a conditional use
permit to construct two self-storage buildings totaling 51,977 square feet at 1100 N. Railroad
Street. The matter has been tabled for two weeks to give local business owners more time to
come back with appraisal studies on the impact of the new facility on their properties.
Additional items include final plan review of the bike/pedestrian crossing at Bridge &
Spruce Streets, a request from Meadows to purchase a city -owned parcel adjacent to 655 N.
Bond Street, scheduling of future comprehensive plan sessions, and discussion o f year-round
sponsor signage at local facilities.
Public Works – The crew has begun providing me with lists of properties where grass needs to
be mowed. Similar to what we did this past winter with the door hangers for snow removal,
I’ve prepared a notice they can put on a door notifying the occupant/owner that the lawn
needs to be addressed within three days, otherwise the DPW crew will mow it and charge the
time to their property taxes. This appears to be a more efficient way of dealing with notices.
DPW report on the previous month’s activities attached to this report (Appendix A)
River Trail Commission – The Commission discussed the response from the WiDOT regarding
snow removal along the proposed trail. They’ve decided to write up a resolution, hoping the
language will prevent or discourage any future reversal on the decision to leave the clearing
of snow up to the discretion of the municipality.
Room Tax Commission – The next meeting of the Room Tax Commission is scheduled for June
10th. In addition to reviewing an additional grant application, a request for a formal audit of
Chamber financials will be made by representatives of the municipalities.
2026 Projects
Dog Park- I finally received a call back from the DNR regarding the wetland fill that might be
needed if we were to install a dog park in the Commerce Loop parcel introduced previously.
Without doing a full wetland assessment of the location, he thought it may not be a high -
quality wetland, and may be exempt, but without getting a DNR guy out there to do a wetland
identification service he’s only able to speculate. We may not be able to fill it in, but we would
need to get that identification done in order to better understand our options. The wetland ID
service costs $300/acre.
3 | Page
Vic Washelesky also submitted a potential plan to incorporate the dog park behind City
Hall. See Appendix C. We can try to revisit this as an option, potentially asking the DPW crew
to push up the snow piles behind City Hall using the front-end loader.
2025 Street Project Close Out – John Promer from MSA and I walked the Silver Lake Road
project to look at any remaining restoration needed so we can finalize this project. He’ll be in
touch with Pitlik on any remaining items and once complete we’ll pay the balance and I can
submit for reimbursement from the LRIP program. This is the final remaining piece to finish up
the 2025 Project.
2026 Street Project – The bid packet for the 2026 road project has been released with bids
due to MSA on June 25. The Council will need to let me know if they would like to have a special
session to approve the bid, or if you’d like to wait until the July meeting.
McKinley Blvd – I had a couple residents from McKinley visit me this past month asking ab out
improvements to McKinley. I let them know about the grant funds awarded and told them a
timeline was not set for the resurfacing of the roadway but would be in the next couple of
years. They asked if there was something that could be done to reduce the severity of the
culverts. I did talk with Brad Adamovich on what options we may have available. They will post
some rough road /bump signs and see if there is something they can do with cold patch to
minimize the bumps.
4 | Page
Appendix A – Public Works Department for May
Submitted by Brad Adamovich
During the month of May, the DPW crew worked on preparing the parks for the upcoming summer
usage. Additionally, the DPW concentrated on road sweeping and patching of roadways that
sustained damage during the winter. The DPW crew also repaired a failing manhole casting on
Adams Rd and replaced a section of sewer main on S. Willow St.
DPW received very few sewer calls during the month. No sewer calls that were received were a
result of an obstruction in a main city sewer line.
Broad overview of DPW work activity during the month:
• Patch streets, alleys, and parking lots with cold patch asphalt
• Mow and general park and ROW grounds maintenance
• Locates of Sanitary Sewer and Storm Drains for Diggers Hotline
• Swept Streets
• Sign repairs and replacement of signs damaged over the winter
• Installation of new road signs
• Maintenance of municipal buildings
• Picked up animal road kills
• Delivered and picked up signage and barricades for events held within the city
• Broomed off roads/intersections/trail crossings/parking lots
• Emptied and monitored yard waste disposal dumpster
• Maintenance of machinery
• Jetted sewer mains
• Continued trap, neuter, return program of the stray cats
• Patched potholes in roadways and sidewalks
• Raked parks and road ROW’s
• Graded gravel streets
• Reviewed bills/invoices for the city and approved accordingly
• Maintenance on boat landing off division/Forest St.
• Completed installation of ladders and swim ropes at beach
• Dispersed picnic tables and benches throughout parks and ROW’s
• Turned on water and opened park bathrooms
• Repaired urinal at beach
• Removed urinal at Depot bathroom
• Broomed and swept islands on Bridge Street
• Removed leaking fuel tank from old blue dump truck
• Removed downed trees and debris from road ROWs
• Trimmed overhanging trees within ROWs
• Trapped nuisance animals
5 | Page
• Worked with surrounding townships to put buoy markers in the lakes and rivers
• Maintenance of playground at the beach
• Repaired picnic tables damaged by rot
• Placed pedestrian yield signs out in business district on Wall St
• Addressed graffiti in different areas of the city
• Rebuilt failing manhole casting on Adams Rd
• Jetted sewer laterals at sewer plant
• Hauled wood chips to Gremban park
• Dug up and repaired a 14’ section of sewer main on S. Willow St
6 | Page
Appendix B – Detachment Procedure
For a property to reverse annexation
Step-by-Step Process for Detachment of Territory (Reversing Annexation) Under
Wisconsin Statute § 66.0227 From City of Eagle River to Town of Lincoln
This document outlines the statutory process for detaching territory from the City of Eagle River
and attaching it to the Town of Lincoln. It is intended as a clear reference for Property Owners
initiating the request and for City Officials handling the petition.
Important Notes
• This is a complex legal process requiring cooperation between the City and Town.
• A single property owner can initiate but usually needs sufficient land area or support to
meet signature thresholds.
• All timelines are strict; missing them voids the process.
SECTION 1: PROCESS FOR PROPERTY OWNER(S)
1. Prepare the Territory Description
o Obtain a precise legal description and scale map of the exact territory (your
property or larger area) to be detached.
o Confirm it is contiguous to the Town of Lincoln.
o Consider impacts on taxes, zoning, services, utilities, and special districts.
2. Publish Class 1 Notice of Intent
o Publish a Class 1 notice (under Chapter 985) in a local newspaper of general
circulation.
o The notice must state the intention to circulate a detachment petition, include
the legal description and map, name the City and Town involved, and provide
contact information.
o Keep proof of publication.
3. Circulate and File the Petition (within 120 days of notice publication)
o The petition must be signed by:
A majority of the owners of three-fourths (3/4) of the taxable land area in
the territory, OR
All owners if there is no taxable land.
o File the signed petition with the City of Eagle River Clerk.
4. City Review and Possible Ordinance (60 days)
o The City Common Council may (but is not required to) pass a detachment
ordinance by a
3/4 vote of all members.
o If passed, proceed to Town acceptance.
o If the City does not pass the ordinance within 60 days, the petition is
automatically rejected.
5. Town of Lincoln Acceptance (60 days after City ordinance)
o The Town Board must pass an attachment ordinance by a 3/4 vote of all
members.
o If the Town does not act or rejects it, the process ends.
7 | Page
6. Referendum (if triggered)
o Either governing body may call a referendum.
o Or, electors can force one with a petition signed by at least 5% of the votes cast
for governor in the last election (in the relevant area).
o The referendum is held in the territory whose electors petitioned for detachment.
o Ballots: “For Detachment” or “Against Detachment.”
o Requires a majority “For Detachment” vote to proceed.
o Timing: 70–100 days after petition filing or ordinance passage.
7. Final Filing and Recording (if approved)
o The City Clerk handles filing the ordinances, certificate, legal description, and map
with:
Vilas County Register of Deeds
Wisconsin Department of Administration (DOA)
Affected utilities, school districts, etc.
o Zoning from the City generally continues until the Town acts to change it.
o Adjust taxes, assets, and liabilities as needed.
SECTION 2: PROCESS FOR THE CITY OF EAGLE RIVER
1. Receive Notice and Petition
o Upon receiving the Class 1 Notice publication or the petition, log the date.
o Review the petition for completeness, proper signatures, and legal description.
2. Governing Body Action (within 60 days of petition filing)
o Place the detachment request on the Common Council agenda.
o Council may enact a detachment ordinance by three-fourths (3/4) vote of all
members.
o Consider fiscal impact, service delivery, tax base effects, and “rule of reason.”
o If approved, forward the ordinance promptly to the Town of Lincoln.
o If not approved within 60 days → Petition is rejected; notify petitioner.
3. Referendum Consideration
o The City may call a referendum on its own.
o Must call one if a valid elector petition (5% threshold) is filed within 30 days of the
ordinance passage.
o Oversee or coordinate the election per state law (Chs. 6 & 7).
4. Coordinate with Town of Lincoln
o Provide the Town with the detachment ordinance and supporting documents.
o Monitor the Town’s 60-day response period.
5. Final Administrative Steps (if both ordinances pass and referendum succeeds, if held)
o Prepare and file required documents:
Certified copies of both ordinances
Legal description and scale map
Certificate of detachment/attachment
o File with: Vilas County Register of Deeds, DOA, and other affected entities.
o Update City records, tax rolls, maps, and notify departments (public works,
utilities, assessor, etc.).
8 | Page
6. Post-Detachment
o Adjust any shared services, infrastructure responsibilities, or financial settlements
with the Town.
o Respond to any legal challenges (detachment actions can be reviewed by courts
for reasonableness).
9 | Page
Appendix C – Dog Park Plan Suggestion
Submitted by Vic Washelesky
Becher-Hoppe Associates, Inc. Date: 12-Sep-25
BHA Project No.:
Prepared By: AJW
(715) 845-8000 Checked By:
Item WisDOT Project Manual Estimated Unit Total
No. REF Section Quantity Cost Cost
1 204.0150 - Removing Curb and Gutter 80 LF $20.00 $1,600.00
2 204.0155 - Removing Sidewalk 253 SY $15.00 $3,788.33
3 205.0100 - Excavation Common 259 CY $25.00 $6,481.48
4 305.0110 - Base Aggregate Dense 3/4 Inch 59 TON $35.00 $2,079.75
5 305.0120 - Base Aggregate Dense 1 1/4 Inch 289 TON $25.00 $7,231.65
6 455.0605 - Tack Coat 28 GAS $4.00 $112.00
7 460.5223 - HMA Pavement 3 LT 58-28-S 52 TON $150.00 $7,762.50
8 460.5245 - HMA Pavement 5 LT 58-34 S 29 TON $200.00 $5,750.00
9 601.0407 Concrete Curb & Gutter 18-Inch Type D 36 LF $50.00 $1,800.00
10 601.0419 - Concrete Curb & Gutter 30-Inch Type L 44 LF $40.00 $1,760.00
11 602.0415 - Concrete Sidewalk 6-inch 645 SF $20.00 $12,900.00
12 602.0505 - Curb Ramp Detectable Warning Field, Yellow 100 SF $60.00 $6,000.00
13 602.0605 - Curb Ramp Detectable Warning Field Radial Yellow 30 SF $70.00 $2,100.00
14 611.9710 - Salvaged Inlet Covers 2 EA $750.00 $1,500.00
15 616.03XX Gate 2 EA $3,000.00 $6,000.00
16 619.1000 - Mobilization 1 EA $7,500.00 $7,500.00
17 625.0500 - Salvaged Topsoil 294 SY $4.00 $1,177.78
18 628.2102 - Moving Signs Type II 1 EA $500.00 $500.00
19 628.1905 - Mobilizations Erosion Control 1 EA $400.00 $400.00
20 628.1910 - Mobilizations Emergency Erosion Control 1 EA $200.00 $200.00
21 627.0200 - Mulching 294 SY $1.50 $441.67
22 628.7015 - Inlet Protection, Type C 10 EA $60.00 $600.00
23 629.0210 - Fertilizer Type B 0.2 CWT $150.00 $27.83
24 630.0140 - Seeding Mixture No. 40 8.0 LB $25.00 $198.75
25 634.0616 - Posts Wood 4x6-inch x 16-ft 7 EA $110.00 $770.00
26 637.xxxx - Signs 143 SF $40.00 $5,724.17
27 643.5000 - Traffic Control (Both Stages) 1 EA $12,500.00 $12,500.00
28 646.7420 - Marking Crosswalk Epoxy Tr nasverse Line 6-Inch 100 LF $15.00 $1,500.00
29 654.0101 Concrete Bases Type 1 7 EACH $1,500.00 $10,500.00
30 657.0305 Poles Type 2 2 EACH $3,000.00 $6,000.00
31 657.0420 Traffic Signal Standards Aluminum 13-FT 1 EACH $600.00 $600.00
32 657.0595 Trombone Arms 25-FT 2 EACH $2,500.00 $5,000.00
33 SPV - Protective Thermoplastic Coating at Snowmobile Trail 22 SY $150.00 $3,366.67
34
Rectangular Rapid Flashing Beacon (RRFB) Wireless
& Solar Powered System Station (2x flashing beacons,
1 wireless solar panel cabinet, 1 solar panel, 1 battery,
1 push button, 1 passive radar detector, 1 radio control
cabinet)
2 LS $7,000.00 $14,000.00
Opinion of Probable Costs
Eagle River Revitalization Committee
USH 45 Crossing
2025.024
Item Description Unit
P:\2025\2025.024 - Eagle River Revit Program-GHT-USH 45 Crossing\Design\OPC\USH 45 Crossing_final.xlsx
1 of 2
5/14/2026 3:15 PM
Item WisDOT Project Manual Estimated Unit Total
No. REF Section Quantity Cost Cost
Item Description Unit
35 -
Rectangular Rapid Flashing Beacon (RRFB) Wireless
& Solar Powered Median System Station (1 flashing
beacons, 1 wireless solar panel cabinet, 1 solar panel,
1 batter, 1 push button, 1 radio control cabinet)
1 LS $5,000.00 $5,000.00
$142,872.56
Construction Costs $142,872.56
15% Contingency 21,430.88 $
Project Total 164,303.45 $
Item WisDOT Project Manual Estimated Unit Total
No. REF Section Quantity Cost Cost
2 204.0155 - Removing Sidewalk 164 SY $15.00 $2,461.67
3 205.0100 - Excavation Common 27 CY $25.00 $683.80
5 305.0120 - Base Aggregate Dense 1 1/4 Inch 65 TON $25.00 $1,629.71
6 455.0605 - Tack Coat 28 GAS $4.00 $112.00
7 460.5223 - HMA Pavement 3 LT 58-28-S 21 TON $150.00 $3,184.78
8 460.5245 - HMA Pavement 5 LT 58-34 S 12 TON $200.00 $2,359.10
12 602.0505 - Curb Ramp Detectable Warning Field, Yellow 10 SF $60.00 $600.00
$11,031.06
Construction Costs $11,031.06
15% Contingency 1,654.66 $
Project Total 12,685.71 $
Project Total Plus M.A. 1 176,989.16 $
MANDATORY ALTERNATE #1
Item Description Unit
P:\2025\2025.024 - Eagle River Revit Program-GHT-USH 45 Crossing\Design\OPC\USH 45 Crossing_final.xlsx
2 of 2
5/14/2026 3:15 PM
Mud17
EagleRiverTaylorL.GordonL.LoonL.MudMinnowL.
DollarL.SilverL.EagleL.OtterL.DuckL.Yellow
L.Perch
LittlePine L.
LINCOLNCatfish L.Spring L.
Frost L.Birch L.Seneca L.Lotus L.
W DIVISION ST
W RIVERVIEW ST
N BIRCH ST
USH 45USH 45RAILROAD STE DIVISION ST
W WALL ST
E SPRUCE ST
EAGLE RIVER
RIVERVIEW PARK
PROJECT AREA
E
STATE PROJECTFEDERAL PROJECTPROJECTCONTRACTSTATE OF WISCONSINDEPARTMENT OF TRANSPORTATIONPLAN OF PROPOSED IMPROVEMENT
TitleProject OverviewGeneral Notes1ORDER OF SHEETS
BECHER HOPPE PROJECT NUMBER
LAYOUTSCALE0
2 2
CORPORATE LIMITSPROPERTY LINELOT LINEEXISTING RIGHT OF WAYSLOPE INTERCEPT
COMBUSTIBLE FLUIDS
POWER POLETELEPHONE POLE
ORIGINAL GROUNDMARSH OR ROCK PROFILE
UTILITY PEDESTAL
GASELECTRICGE
T
PROPOSED OR NEW R/W LINE
CAUTION
WOODED OR SHRUB AREAMARSH AREA
EXISTING CULVERTPROPOSED CULVERT (Box or Pipe)
CULVERT (Profile View)
CONVENTIONAL SYMBOLS
ROCK (To be noted as such)
SSWSANSANITARY SEWERSTORM SEWERWATER
COUNTY: WITH:PROJECT ID:
PLOT NAME : P:\2025\2025.024 - EAGLE RIVER REVIT PROGRAM-GHT-USH 45 CROSSING\CAD\PLANS\010101-TI.DWGFILE NAME : 5/14/2026 7:57 AMPLOT DATE :PLOT BY :AARON J. WALLNER
FOFIBER OPTICUTILITIESREFERENCE LINE
GRADE LINEPROFILE
TELEPHONE
SPECIAL DITCHLABELLIMITED HIGHWAY EASEMENT
TOTAL SHEETS =
GRADE ELEVATION
95.36
PLAN
Section No.Section No.Section No.
300'EB'
Construction Details2Section No.Curb Ramp Details2Section No.Permanent Signage2Section No.Standard Detail Drawings6Section No.
Typical Sections2Section No.
Grading and Erosion Control5Section No.Traffic Control2Section No.
2025.024
VILAS
VILAS COUNTYUSH 45EAGLE RIVER REVITALIZATION PROGRAM BICYCLE AND PEDESTRIAN CROSSING2025.024
1 MI
SurveyorPREPARED BY STATE OF WISCONSIN
DATE:
Designer
(Signature)APPROVED FOR THE DEPARTMENT
DEPARTMENT OF TRANSPORTATION
Project ManagerRegional ExaminerRegional SupervisorNANABECHER HOPPEBECHER HOPPEBECHER HOPPE
HORIZONTAL POSITIONS SHOWN ON THIS PLAN ARE WISCONSINCOORDINATE REFERENCE SYSTEM (WISCRS),NAD83 ( ), IN U.S. SURVEY FEET. POSITIONS SHOWN ARE GRIDCOORDINATES, GRID BEARINGS, AND GRID DISTANCES. GRID DISTANCESARE THE SAME AS GROUND DISTANCES.ELEVATIONS ARE REFERENCED TO NAVD 88 ( ). GPS DERIVEDELEVATIONS ARE BASED ON GEOID2011VILAS COUNTY,201218
26
DIGGERS HOTLINEDial or (800)242-8511www.DiggersHotline.com
DESIGN PROJECT MANAGER
PHONE: EMAIL:AARON WALLNERBECHER HOPPE ASSOCIATES, INC330 N 4TH STREETWAUSAU WI, 54403(715) 845-8000AWALLNER@BECHERHOPPE.COMDESIGN PROJECT LEADER
PHONE: EMAIL:LAURA VAN VALKENBERGGREAT HEADWATERS TRAILS FOUNDATIONPO BOX 1164EAGLE RIVER, WI 54521(715) 303-4483GHTRAILS@GMAIL.COM
CONTACTS
PHONE: EMAIL:JO ANN SIMONSEXECUTIVE DIRECTOR525 E MAPLE STREET, PO BOX 2302EAGLE RIVER, WI 54521(715) 477-0645DIRECTOR@EAGLERIVERREVITALIZATION.ORG
EAGLE RIVER REVITALIZATION PROGRAM CONTACT
TOTAL PROJECT AREA = _________ ACRESTOTAL AREA EXPECTED TO BE DISTURBED BY CONSTRUCTION ACTIVITIES = ________ACRES
HYDROLOGIC SOIL GROUPA B C DSLOPE RANGE (PERCENT)SLOPE RANGE (PERCENT)SLOPE RANGE (PERCENT)SLOPE RANGE (PERCENT)LAND USE:0-22-66 & OVER0-22-66 & OVER0-22-66 & OVER0-22-66 & OVERROW CROPS:.08.16.22.12.20.27.15.24.33.19.28.38.22.30.38.26.34.44.30.37.50.34.41.56MEDIAN STRIPTURF:.19.20.24.19.22.26.20.23.30.20.25.30.24.26.30.25.28.33.26.30.37.27.32.40SIDE SLOPETURF:.25.27.28.30.32.34.36.38PAVEMENT:ASPHALT: .70 - .95CONCRETE:.80 - .95BRICK: .70 - .80DRIVES, WALKS:.75 - .85ROOFS: .75 - .95GRAVEL ROADS, SHOULDERS:.40 - .60
RUNOFF COEFFICIENT TABLE
1.625 0.267
ABUTABUTMENTACACREAGGAGGREGATEAHAHEADANGLEAADTANNUAL AVERAGE DAILY TRAFFICAEWAPRON ENDWALLASPHASPHALTICBKBACKBCBACK OF CURBBADBASE AGGREGATE DENSEBL OR B/LBASE LINEBMBENCH MARKCBCATCH BASINCL OR C/LCENTER LINEΔCENTRAL ANGLE OR DELTACECOMMERCIAL ENTRANCECONCCONCRETECSWCONCRETE SIDEWALKCONSTCONSTRUCTIONCPCONTROL POINTCOCOUNTYCTHCOUNTY TRUCK HIGHWAYCYCUBIC YARDCPCULVERT PIPECPCACULVERT PIPE CORRUGATED ALUMINUMCPCPECULVERT PIPE CORRUGATED POLYETHYLENECPCPPCULVERT PIPE CORRUGATED POLYPROPYLENECPCSCULVERT PIPE CORRUGATED STEELCPCSACCULVERT PIPE CORRUGATED STEEL ALUMINUM COATEDCPCSPCCULVERT PIPE CORRUGATED STEEL POLYMER COATEDCPRCCULVERT PIPE REINFORCED CONCRETECPRCHECULVERT PIPE REINFORCED CONCRETE HORIZONTAL ELLIPTICALCPSCULVERT PIPE SALVAGEDCPTCULVERT PIPE TEMPORARYC & GCURB AND GUTTERDDEGREE OF CURVEDHVDESIGN HOUR VOLUMEDIADIAMETERDDDIRECTIONAL DISTRIBUTIONDEDRAINAGE EASEMENTDWYDRIVEWAYEAEACHEBEASTBOUNDEL OR ELEVELEVATIONEMBEMBANKMENTEWENDWALLEATENERGY ABSORBING TERMINALESALSEQUIVALENT SINGLE AXLE LOADSEXCEXCAVATIONEBSEXCAVATION BELOW SUBGRADEEXISTEXISTINGFERTFERTILIZERFEFIELD ENTRANCEFL OR F/LFLOW LINEFTFOOTFTMSFREE TRAFFIC MANAGEMENT SYSTEMHESHIGH EARLY STRENGTHHEHIGHWAY EASEMENTCWTHUNDRED WEIGHTIN DIAINCH DIAMETERINLINLETIDINSIDE DIAMETERINTERSINTERSECTIONIHINTERSTATE HIGHWAYINVINVERTJTJOINT
LTLEFTLHFLEFT HAND FORWARDL LENGTH OF CURVELFLINEAR FOOTLCLONG CHORD OF CURVELSLUMP SUMMGALONE THOUSAND GALLONSMHMANHOLEML OR M/LMATCH LINENOMNOMINALNCNORMAL CROWNNBNORTHBOUNDNONUMBERODOUTSIDE DIAMETERPAVTPAVEMENTPLEPERMANENT LIMITED EASEMENTPCPOINT OF CURVATUREPIPOINT OF INTERSECTIONPTPOINT OF TANGENCYPCCPORTLAND CEMENT CONCRETELBPOUNDPSIPOUNDS PER SQUARE INCHPEPRIVATE ENTRANCEPROJPROJECTPLPROPERTY LINEPRWPROPOSED RIGHT OF WAYR RADIUSRL OR R/LREFERENCE LINEREQDREQUIREDRTRIGHTRHFRIGHT HAND FORWARDR/WRIGHT OF WAYRDROADRDWYROADWAYSHLDRSHOULDERSWSIDEWALKSBSOUTHBOUNDSPECSSPECIFICATIONSSFSQUARE FEETSYSQUARE YARDSDDSTANDARD DETAIL DRAWINGSSTHSTATE TRUNK HIGHWAYSTASTATIONSSPCSTORM SEWER PIPE COMPOSITESSCPESTORM SEWER PIPE CORRUGATED POLYETHYLENESSCPPSTORM SEWER PIPE CORRUGATED POLYPROPYLENESSPNRCSTORM SEWER PIPE NON-REINFORCED CONCRETESSPRCSTORM SEWER PIPE REINFORCED CONCRETESSPRCSTORM SEWER PIPE REINFORCED CONCRETESSPRCHESTORM SEWER PIPE REINFORCED CONCRETE HORIZONTAL ELLIPTICALSESUPERELEVATIONSL OR S/LSURVEY LINETEMPTEMPORARYTITEMPORARY INTERESTTLETEMPORARY LIMITED EASEMENTTCTOP OF CURBTL OR T/LTRANSIT LINET TRUCKS (PERCENT OF)TYPTYPICALUSHUNITED STATES HIGHWAYVARVARIABLEVCVERTICAL CURVEVPCVERTICAL POINT OF CURVATUREVPIVERTICAL POINT OF INTERSECTIONVPTVERTICAL POINT OF TANGENCYWWESTWBWESTBOUND
STANDARD ABBREVIATIONSTHE LOCATIONS OF EXISTING UTILITY FACILITIES SHOWN ON THE PLANSARE APPROXIMATE. THERE MAY BE OTHER UTILITY INSTALLATIONSWITHIN THE PROJECT AREA THAT ARE NOT SHOWN.GENERAL NOTESCONTRACTOR WILL BE RESPONSIBLE FOR RESHAPING AND SEEDING ANYPREVIOUSLY GRASSED AREAS WHICH ARE DISTURBED BY OPERATIONS,OUTSIDE OF THE NORMAL CONSTRUCTION LIMITS.HMA PAVEMENT WEIGHT CALCULATIONS ARE BASED ON 115 LBS/SY/IN.RIGHT OF WAY INFORMATION AND PROPERTY LINE DATA SHOWN ONTHE PLANS ARE APPROXIMATE.THE CONTRACTOR IS TO WORK WITH UTMOST CARE AND PROTECT ALLSURVEY MARKERS. REMOVAL OF ANY SURVEY MARKER IS TO BE WITHTHE APPROVAL OF THE ENGINEER. IF SURVEY MARKERS ARE DESTROYED,THEY ARE TO BE REPLACED AT THE COST OF THE CONTRACTOR.TOPSOIL SHALL BE PLACED 1-INCH BELOW THE TOP OF ADJACENT CURBSOR SIDEWALKS.RADIUS DIMENSIONS FOR THE CURB AND GUTTER ARE TO THE FLANGELINE UNLESS OTHERWISE NOTED.PAVEMENT REMOVAL WILL BE TO THE NEAREST JOINT OR A SAWEDEDGE WILL BE REQUIRED AS DIRECTED BY THE ENGINEER.CURB AND GUTTER PLAN GRADES ARE AT THE FLANGE LINE UNLESSOTHERWISE NOTED.SAWCUTS, AS SHOWN ON THE PLANS, ARE SUGGESTED LOCATIONS ANDMAY BE ADJUSTED AT THE DISCRETION OF THE ENGINEER TO BETTERSUIT FIELD CONDITIONS.TRAFFIC CONTROL DEVICES SHALL BE ADJUSTED TO FIT FIELDCONDITIONS AS DIRECTED BY THE ENGINEER.DO NOT DRIVE OR STORE EQUIPMENT, OR STORE CONSTRUCTIONMATERIALS IN ENVIRONMENTALLY SENSITIVE AREAS, WETLANDS ORWATERWAYS.MANDATORY ALTERNATE #1 SHALL CONSIST OF THE REMOVAL OFSIDEWALK ALONG THE SOUTH AND EAST EXTENTS OF THE PROJECT ANDREPLACING WITH HOT MIX ASPHALT.
FRONTIER COMMUNICATIONSPHONE:(262) 446-9821RHINELANDER, WI 5450153 N STEVENS STFIBER OPTIC
WISDOT/CADDS SHEET 42EHWY:COUNTY:P:\2025\2025.024 - EAGLE RIVER REVIT PROGRAM-GHT-USH 45 CROSSING\CAD\PLANS\020101-GN.DWGFILE NAME : 5/14/2026 8:03 AMPLOT DATE :PLOT BY :AARON J. WALLNER
2
PROJECT NO: PLOT NAME :
2
SHEET PLOT SCALE :1" = 1'2025.024USH 45VILASGENERAL NOTESLAYOUT NAME - 01
EL
S
WV
WVWV
MH MH
OH
OH
OH
FOFO
FO
FO
FOFOFO
XXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXX
B
B
W16-9P
B
XXXXXXXX
X
XXXX
XXXX
X
E SPRUCE ST
RAILROAD STUSH 45/STH 32/ STH 17
USH 45/STH 32/ STH 17
RIVERVIEW PARK
W RIVERVIEW STW DIVISION ST
GIS PROPERTY LINE (TYP.)CITY OF EAGLE RIVER
PRIVATE PROPERTY
CITY OF EAGLE RIVER
PRIVATE PROPERTY
PRIVATE PROPERTYPRIVATE PROPERTYPRIVATE PROPERTY
PRIVATE PROPERTY
PRIVATEPROPERTY
PRIVATE PROPERTY
MOTORIZED VEHICLETRAIL TO REMAIN
INFORMATION BOARD/KIOSKTO BE INSTALLED BY OTHERS
RECTANGULAR RAPID FLASHING BEACON (RRFB)WIRELESS AND SOLAR POWER SYSTEM (TYP.)
CURB RAMP
STEEL PIPE GATE (TYP.)SEE CONSTRUCTION DETAIL B/06.
EXISTING CURB RAMPS TO REMAIN
EXISTING SIDEWALK TO BE REMOVED. SEEPLAN SHEETS FOR RESTORATION LIMITS.
EXISTING SIDEWALK TO REMAIN AS A PART OF THEBASE PROJECT. SEE TYPICAL SECTION "PEDESTRIANMULTI-USE TRAIL ALONG SIDEWALK"
EXISTING SNOWMOBILE TRAILCROSSING AND RAMPS TO RECEIVENEW THERMOPLASTIC COATING
PROPOSED SIGNCURB RAMPS
CURB RAMPSTEEL PIPE GATE (TYP.)SEE CONSTRUCTION DETAILS.SNOWMOBILE TRAIL TO BE RE-ALIGNED. SEE PLANSHEETS FOR GRADES AND RESTORATION LIMITS.
CURB RAMP
PROPOSED SIGNSPROPOSED SIGN
PROPOSED SIGN
MEDIAN PUSHBUTTON ASSEMBLY
PROPOSED SIGNEXISTING FENCE TO BE REMOVED & BOTH SNOWMOBILETRAIL DIRECTIONAL SIGNS TO BE REMOVED ANDRE-INSTALLED ALONG RE-ALIGNED TRAILEXISTING "NO RIGHT TURN" SIGNTO BE REMOVED & RE-INSTALLED
EXISTING TRAIL STOP SIGN TO BE REMOVED ANDRE-INSTALLED OUTSIDE OF RE-ALIGNED TRAIL.105+30
100+00
101+00
102+00
103+00104+00
105+00 EXISTING SNOWMOBILETRAIL TO BE REMOVED
CURB RAMP MANDATORY ALTERNATE #1:REMOVE EXISTING CONCRETE SIDEWALK,REPLACE WITH HOT MIX ASPHALT
WISDOT/CADDS SHEET 42EHWY:COUNTY:P:\2025\2025.024 - EAGLE RIVER REVIT PROGRAM-GHT-USH 45 CROSSING\CAD\PLANS\020201-PO.DWGFILE NAME : 5/14/2026 8:08 AMPLOT DATE :PLOT BY :AARON J. WALLNER
2
PROJECT NO: PLOT NAME :
2
SHEET PLOT SCALE :1 IN:40 FT2025.024USH 45VILASPROJECT OVERVIEWLAYOUT NAME - 01
GENERAL NOTES-SEE PERMANENT SIGNAGE SHEET FOR EXACT SIGN PLACEMENTS.-SEE CURB RAMP DETAIL SHEETS FOR ALL CURB RAMP DESIGNS.-PROPERTY LINES ARE BASED ON 2025 GIS DATA FROM VILAS COUNTY.-AERIAL IMAGE IS FROM 2025 MICROSOFT MAP DATA.
1 %WIDTH VARIESWIDTH VARIES
EXISTING BASE AGGREGATEDIRT TRAIL UNKNOWN THICKNESS
EXISTING SNOWMOBILE TRAIL
1 %6' 6'
6" BASE AGGREGATE DENSE 1 1/4 -INCH
3" BASE AGGREGATE DENSE 3/4-INCH
SNOWMOBILE TRAIL PROPOSED TYPICAL SECTION
1 %
1 %
EXISTING GROUND, SEED,FERTILIZER, TOPSOIL, MULCHDISTURBED AREASEXISTING GROUND, SEED,FERTILIZER, TOPSOIL, MULCHDISTURBED AREAS
RL
RLEXISTING GROUND EXISTING GROUND
WISDOT/CADDS SHEET 42EHWY:COUNTY:P:\2025\2025.024 - EAGLE RIVER REVIT PROGRAM-GHT-USH 45 CROSSING\CAD\PLANS\020301-TS.DWGFILE NAME : 5/14/2026 8:30 AMPLOT DATE :PLOT BY :AARON J. WALLNER
2
PROJECT NO: PLOT NAME :
2
SHEET PLOT SCALE :1 IN:5 FTLAYOUT NAME - 012025.024USH 45VILASTYPICAL SECTIONS
1 %5' 5'
PEDESTRIAN MULTI-USE TRAILSTA 100+05-100+60STA 104+20 -105+20
1 %
1 %VARIES 5'-6'VARIES 4'-5'
EXISTING SIDEWALK TO REMAIN*PEDESTRIAN MULTI-USE TRAIL ALONG SIDEWALKSTA 100+60 - 103+30
VARIES (1-3%)EXISTING GROUND
6.5" BASE AGGREGATE DENSE 1 1/4 -INCH
RAILROAD STREET6:1
SEED, FERTILIZER,TOPSOIL, MULCH
EXISTING GROUND6:1
SEED, FERTILIZER,TOPSOIL, MULCH EXISTING GROUND6:1
SEED, FERTILIZER,TOPSOIL, MULCHRL
RL
3.5" HOT MIX ASPHALT1.25" 5 LT 58-34 S2.25" 3 LT 58-28 S NOTE*SEE CURB RAMP DETAIL SHEETS FORCONCRETE ONLY AREAS
1 %5' 5'
REMOVE EXISTING SIDEWALKPEDESTRIAN MULTI-USE TRAIL ALONG SIDEWALK: MANDATORY ALTERNATE #1STA 100+60 - 103+30
1%EXISTING GROUND
6.5" BASE AGGREGATE DENSE 1 1/4 -INCH
RAILROAD STREET6:1
SEED, FERTILIZER,TOPSOIL, MULCHRL
3.5" HOT MIX ASPHALT1.25" 5 LT 58-34 S2.25" 3 LT 58-28 S
6.5" BASE AGGREGATE DENSE 1 1/4 -INCH3.5" HOT MIX ASPHALT1.25" 5 LT 58-34 S2.25" 3 LT 58-28 S
WISDOT/CADDS SHEET 42EHWY:COUNTY:P:\2025\2025.024 - EAGLE RIVER REVIT PROGRAM-GHT-USH 45 CROSSING\CAD\PLANS\020301-TS.DWGFILE NAME : 5/14/2026 8:30 AMPLOT DATE :PLOT BY :AARON J. WALLNER
2
PROJECT NO: PLOT NAME :
2
SHEET PLOT SCALE :1 IN:5 FTLAYOUT NAME - 022025.024USH 45VILASTYPICAL SECTIONS
LIGHTSWARNINGTURN ONBUTTON TOPUSH
CONCRETE BASES TYPE 2CONTRACTOR TO SUBMIT STAMPEDCONCRETE BASE DESIGN BASED ON SITECONDITIONS
TRANSFORMER BASESBREAKAWAY 11 1/2-INCHBOLT CIRCLEAUDIBLE PEDESTRIAN PUSH BUTTONS(FACE TOWARDS SIDEWALK)R10-25 (9"X12")(FACE TOWARDS SIDEWALK)
2-RRFB INDICATORS (MIN. 5"WIDE X 2" HIGH)**ASSEMBLY SHALL NOTPROJECT BEYOND EDGESOF MAIN SIGN.
2-RRFB INDICATORS (MIN. 5" WIDE X 2" HIGH)**ASSEMBLY SHALL NOT PROJECT BEYOND EDGESOF MAIN SIGN. POLES TYPE 2
TROMBONE ARMS 25-FT25'-0"
3'-6"6'-3" +/- 3"
2'-0" MIN.4'-0" MAX.
17'-0" MIN.19'-0" MAX.
W11-15*36"X36"
W16-7L***30"X18"
W11-15*36"X36"
NOTES:*TWO (2) W11-15 SIGNS MOUNTED BACK TO BACK**MOUNT RRFB LIGHT BARS BACK TO BACK***ONE (1) W16-7L AND ONE (1) W16-7R SIGN MOUNTED BACK TO BACK. ARROW SHALL BE DIRECTED TOWARDS THE CURB.RRFB SYSTEM SHALL BE WIRELESSLY LINKED TO RRFB SYSTEM LOCATED ON THE SOUTHBOUND SIDE OF USH 45 AND MEDIAN SO ALL SYSTEMS ARE ACTIVATED SIMULTANEOUSLYWHEN BUTTON IS PRESSED.RRFB SYSTEM SHALL BE SOLAR POWERED. PROVIDE AND MOUNT SOLAR PANELS PER MANUFACTURER RECOMMENDATIONS.MOUNT SYSTEM CONTROLLER CABINETS ON POLES PER MANUFACTURER RECOMMENDATIONS.SEE S.D.D. "CONCRETE BASES, TYPES 1, 2, 5 &6" FOR MORE INFORMATION ON CONCRETE BASES TYPE 2.SEE S.D.D. "TRANSFORMER/PEDESTAL BASES" FOR MORE INFORMATION.SEE S.D.D. "POLE MOUNTINGS FOR TRAFFIC SIGNALS, TYPE 2" FOR MORE INFORMATION ON POLES TYPE 2.
EXISTING PAVEMENTEXISTING GROUND
RECTANGULAR RAPID FLASHING BEACON (RRFB) WIRELESS & SOLAR POWERED SYSTEM05NOT TO SCALEA
TRAFFIC SIGNAL STANDARDS ALUMINUM 15-FT6'-3" MIN
2'MIN
LOCATE ABOVE PUSH BUTTON.3.5' MOUNTING HEIGHT TOPUSH BUTTON.3'-6"PEDESTAL BASE TYPE 1
CONCRETE BASES TYPE 1CONTRACTOR TO SUBMIT STAMPED CONCRETEBASE DESIGN BASED ON SITE CONDITIONS
AUDIBLE PEDESTRIAN PUSH BUTTON2.1'
RECTANGULAR RAPID FLASHING BEACON (RRFB) SYSTEM - MEDIAN05NOT TO SCALEB
NOTES:*TWO (2) W11-5 SIGNS MOUNTED BACK TO BACK.**MOUNT RRFB LIGHT BARS BACK TO BACK.***ONE (1) W16-7L AND ONE (1) W16-7R SIGN MOUNTED BACK TO BACK. ARROW SHALL BE DIRECTED TOWARDS THE SHOULDER.ALL RRFB LOCATIONS SHALL BE WIRELESSLY LINKED TO EACHOTHER SO ALL SYSTEMS ARE ACTIVATED SIMULTANEOUSLY WHEN ANYPUSH BUTTON IS PRESSED.RRFB SYSTEM SHALL BE SOLAR POWERED. PROVIDE AND MOUNT SOLAR PANELS PER MANUFACTURER RECOMMENDATIONS. SOLARPANEL TO BE MOUNTED 13 FEET ABOVE FINISHED GRADE.MOUNT SYSTEM CONTROLLER CABINETS ON POLES TYPE 1 PER MANUFACTURER RECOMMENDATIONS.SEE S.D.D. "TRANSFORMER/PEDESTAL BASES" FOR MORE INFORMATION.
LIGHTSWARNINGTURN ONBUTTON TOPUSHR10-25 (9"X12")(FACE TOWARDS SIDEWALK)
2-RRFB INDICATORS (MIN. 5" WIDE X 2" HIGH)**ASSEMBLY SHALL NOT PROJECT BEYOND EDGESOF MAIN SIGN.
W11-15*36"X36"
W16-7L***30"X18"LIGHTSWARNINGTURN ONBUTTON TOPUSHR10-259" X 12"
110V AC CONTROL CABINET WITH WIRELESSCOMMUNICATION CABINET HEIGHT MAYVARY BASED ON INSTALLERS DISCRETION110V AC CONTROL CABINET WITH WIRELESSCOMMUNICATION CABINET HEIGHT MAYVARY BASED ON INSTALLERS DISCRETION13'
SOLAR PANEL, BATTERY, AND ALL ANCILLARYITEMS TO BE INSTALLED PERMANUFACTURER RECOMMENDATIONS
SOLAR PANEL, BATTERY, AND ALL ANCILLARYITEMS TO BE INSTALLED PERMANUFACTURER RECOMMENDATIONS
WISDOT/CADDS SHEET 42EHWY:COUNTY:P:\2025\2025.024 - EAGLE RIVER REVIT PROGRAM-GHT-USH 45 CROSSING\CAD\PLANS\021001-CD.DWGFILE NAME : 5/14/2026 8:35 AMPLOT DATE :PLOT BY :AARON J. WALLNER
2
PROJECT NO: PLOT NAME :
2
SHEET PLOT SCALE :1:40LAYOUT NAME - 052025.024USH 45VILASCONSTRUCTION DETAILS
54"
5'
VARIES 6"
7'7'
STEEL PIPE GATE DETAIL06NOT TO SCALEBNOTES:1. STEEL PIPE GATE TYPICAL2. SIGNS MOUNTED DIRECTLY TO GATE
PEDESTRIANSBICYCLESPROHIBITEDMOTOR BICYCLESNON MOTORIZED TRAFFICR5-5736"X36"
STAY ONSIDEWALK
NOTE:1)SIGN IS TYPE II, TYPE F REFLECTIVE2)COLORS:BACKGROUND - WHITEMESSAGE - BLACK3)SIGN PLATE: W4-4B
30"
12"
R1.5"
3"
1.25"
1.25"
2"
SNOWMOBILE ROUTED11-624"X18"
STAY ON SIDEWALK SIGN DETAIL06NOT TO SCALEC
CONCRETE BASES TYPE 1CONTRACTOR TO SUBMIT STAMPED CONCRETEBASE DESIGN BASED ON SITE CONDITIONS
FLAG LINEEXISTING PAVEMENT SURFACE
REMOVING CURB & GUTTERCONCRETE CURB & GUTTER 30-INCH TYPE DOR 6-INCH SLOPED, 36-INCH TYPE DFINISHED GRATE ELEVATION CONSTRAINEDBY ADJACENT GRADE OF EXISTING CURB1" DEPRESSION BELOWNORMAL FLOW LINEFLOWLINE
CONSTRUCTION JOINTSAWING CONCRETE
FLOW LINEEDGE OF PAVEMENTCONSTRUCTION JOINTSAWING CONCRETE
SAWING ASPHALT
SALVAGE AND RESET EXISTING COVER UNLESS NEW COVER NOTED IN PLAN.SALVAGE AND RESET, OR REMOVAL OF EXISTING COVERS, PAID FOR AS SALVAGED INLET COVERS.NEW COVERS (WHERE REQUIRED) PAID FOR AS INLET COVERS AS NOTED IN PLAN.
EXISTING BASE AGGREGATE DENSEDEPTH VARIES
SAWING ASPHALTAS SHOWN BELOW
FLAGLINE
EXISTING CURB & GUTTER(30-INCH TYPE D SHOWN, OTHERS SIMILAR)
SAWING CONCRETE
SAWING CONCRETE
REPAIR AND ADJUSTAS NECESSARY TO MEETREQUIRED GRADENOTES:·ADJUST INLETS PRIOR TO FINALASPHALT OVERLAY.·COMMON EXCAVATION TO BEINCIDENTAL TO ADJUSTING INLETCOVERS BID
SECTION A-A
ELEVATION
TOP OF CURB
A
(EXISTING PAVEMENT)
A
FLOW
ASPHALTIC SURFACE PATCHING TO MATCH EXISTINGDEPTH, PLACE WITH MAX LIFT HEIGHT OF 3".
AA
24"
17 3/4"6"6"2 1/2"4"
VAR 3' NOR
INLET COVERVAR 3' NOR
REPLACE BASE AGGREGATE AS NEEDEDTO MATCH EXISTING CROSS SECTION
2' MAX
VAR 3' NOR
VAR 3' NOR
EXISTING HMA AND BASEAGGREGATE DENSE 1 1/4-INCH TOBE REMOVED AS NEEDED AND PAIDAS EXCAVATION COMMON.CONTRACTOR TOMATCH EXISTINGRING MATERIAL.
ADJUSTING INLET COVERS DETAIL06NOT TO SCALEA
WISDOT/CADDS SHEET 42EHWY:COUNTY:P:\2025\2025.024 - EAGLE RIVER REVIT PROGRAM-GHT-USH 45 CROSSING\CAD\PLANS\021001-CD.DWGFILE NAME : 5/14/2026 8:36 AMPLOT DATE :PLOT BY :AARON J. WALLNER
2
PROJECT NO: PLOT NAME :
2
SHEET PLOT SCALE :1:40LAYOUT NAME - 062025.024USH 45VILASCONSTRUCTION DETAILS
S
MP
WVWV
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXX
RAILROAD ST
COMMERCIALDRIVEWAY
SIDEWALK TO BE REMOVED.SEE PLAN SHEETS FOR LIMITS.EXITING MOTORIZED TRAIL TO REMAINEXITING MOTORIZED TRAIL TO BE RESTORED
100+00 100+50
101+00
USH 45/STH 32/ STH 1712 34
56789
10
111213
1415 16 17
1819 20
212223 PI: 100+89.53
SURVEY MONUMENT.DO NOT DISTURB
South HMA Curb RampPOINT NUMBER1234567891011121314151617181920212223
STATION100+03.67100+04.28100+18.29100+18.89100+21.59100+21.07100+19.86100+18.76100+07.12100+08.23100+06.64100+07.81100+05.60100+13.33100+19.77100+33.08100+50.37100+56.32100+23.11100+56.26100+63.68100+29.37100+21.04
OFFSET25.13' RT24.65' RT17.50' RT17.23' RT4.81' RT4.81' RT10.17' RT15.04' RT12.07' RT7.19' RT11.95' RT7.40' RT8.48' RT5.22' LT5.20' LT5.15' LT5.08' LT0.03' LT0.02' LT4.98' RT15.65' RT16.21' RT16.71' RT
ELEVATION1637.301637.291637.291637.291637.561637.561637.471637.391637.571637.651637.491637.681637.731637.731637.701637.651637.531637.431637.621637.421637.241637.231637.30
NORTHING106410.61106411.26106422.23106422.67106435.33106435.18106429.70106424.72106424.12106429.10106424.09106428.78106427.09106442.47106444.35106448.24106453.29106450.22106440.39106445.42106437.42106426.74106423.80
EASTING501032.29501032.74501044.01501044.49501043.40501042.91501043.33501043.72501031.73501031.34501031.23501031.01501029.22501032.54501038.71501051.44501067.97501075.15501043.43501076.57501086.82501054.20501046.40
146.5 LF MARKINGLINE EPOXY 6-INCH
CURB RAMPDETECTABLEWARNING FIELDRADIAL, YELLOW
R42'
21 LF SAWINGCONCRETE
2.2%1.5%
1.5%1.5%12.0'
LEGENDCURB RAMP TYPEADA COMPLIANT LANDING PAD3.5" HOT MIX ASPHALTXLPHMA
LP
HMA 5 LF SAWINGCONCRETE
4B1
4" HMA CURB
1.3%1.3% 0.7%
5.0'1.5%
MANDATORY ALTERNATE 1:CURB RAMP TO BE INSTALLED WITHTRUNCATED DOMES AND HMA SURFACE
WISDOT/CADDS SHEET 42EHWY:COUNTY:P:\2025\2025.024 - EAGLE RIVER REVIT PROGRAM-GHT-USH 45 CROSSING\CAD\PLANS\021301-CR.DWGFILE NAME : 5/14/2026 10:39 AMPLOT DATE :PLOT BY :AARON J. WALLNER
2
PROJECT NO: PLOT NAME :
2
SHEET PLOT SCALE :1 IN:10 FT2025.024USH 45VILASCURB RAMP DETAILSLAYOUT NAME - 01
GENERAL NOTES-PROPERTY LINES ARE BASED ON 2025 GIS DATA FROM VILAS COUNTY.-AERIAL IMAGE IS FROM 2025 MICROSOFT MAP DATA.-SEE PLAN SHEETS FOR HMA GRADING
WV MHMH
OH
OH
OH
OH
OH
OH
OH
FO
FO
FO
FO
FOFOFOFOFOFOFO
FO
FOFOFOFOFOFO
FO XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
B
B
XXXXXXX
XXXXXXXX
XXX
XXXX
XX
XX XX
XXXXXX E SPRUCE ST
RAILROAD ST
USH 45/STH 32/ STH 17
SIDEWALK TO BE REMOVED.SEE PLAN SHEETS FOR LIMITS.
103+00 103+50
104+00
PC: 103+56.67
PT: 103+67.99
1638.660BM HYD NW BOLT
49 LF MARKINGLINE EPOXY 6-INCH
CONCRETE CURB ANDGUTTER 18-INCH TYPE D
CONCRETE CURB ANDGUTTER 18-INCH TYPE DTRANSITION EXISTING INLET26 LF SAWING ASPHALT
20 LF SAWING ASPHALT
5051 525354 55565758596061626364656667EXISTING MANHOLE TO REMAINEXISTING LIGHT POLE TO REMAINNE Curb RampPOINT NUMBER5051525354555657585960616263646566676869
STATION103+36.62103+36.63103+56.88103+59.11103+58.62103+60.17103+60.83103+62.31103+63.73103+65.93103+64.47103+69.07103+69.02103+68.91103+68.99103+59.21103+37.56103+41.64103+57.55103+60.44
OFFSET0.03' LT4.13' RT8.05' RT9.80' RT14.85' RT16.49' RT12.64' RT9.05' RT10.78' RT8.70' RT6.33' RT8.00' RT5.00' RT5.00' LT8.00' LT1.50' LT5.87' LT0.00'3.18' RT5.52' RT
ELEVATION1636.591636.501636.291636.371636.401636.471636.441636.371636.441636.261636.291636.411636.111636.071636.391636.141636.641636.491636.221636.29
NORTHING106693.64106695.36106715.62106720.49106722.78106727.22106725.35106724.06106726.77106725.34106722.76106723.80106720.92106711.30106708.38106713.03106692.10106698.23106714.33106719.19
EASTING501027.57501031.37501026.53501025.37501030.03501028.04501024.20501019.37501017.00501011.91501014.54501006.81501007.65501010.39501011.11501016.87501021.86501025.54501021.70501020.54
6869
100101102 103104105106 107108 109110111 112113114
115Median Curb RampPOINT NUMBER100101102103104105106107108109110111112113114115116
STATION103+97.68103+97.72103+97.66103+97.96103+98.00103+98.26104+01.69104+01.83104+06.69104+06.83104+10.62104+10.63104+10.77104+10.71104+10.69104+14.32104+14.19
OFFSET8.00' LT6.00' LT5.00' LT5.00' RT6.00' RT12.63' RT4.98' LT5.02' RT4.96' LT5.04' RT4.94' LT5.94' LT9.01' RT6.06' RT5.06' RT9.02' RT5.96' LT
ELEVATION1636.431636.451635.941635.921636.331636.231636.111635.961636.191636.041635.981636.351636.241636.291635.891635.941636.04
NORTHING106700.82106702.74106703.72106713.29106714.24106720.57106702.68106712.29106701.38106710.99106700.37106699.40106713.78106710.95106709.99106712.86106698.43
EASTING500983.43500982.86500982.66500979.73500979.43500977.43500978.77500975.99500973.94500971.16500970.14500970.40500966.32500967.15500967.44500962.90500966.96
47.5 LF MARKINGLINE EPOXY 6-INCH19 LF SAWING ASPHALT
CURB RAMP DETECTABLEWARNING FIELD YELLOW (TYP.)CONCRETE CURB ANDGUTTER 30-INCH TYPE L
116
10.0'5.0'
10.0'4.8'
7.2'
4.2%1.5%1.5%1.0%0.2%
0.9%
0.7%
1.5%1.5%3.4%2.1%0.8%
0.8%1.5%
1.0%2.6%
LEGENDCURB RAMP TYPEADA COMPLIANT LANDING PAD3" HOT MIX ASPHALTCONCRETE SIDEWALK 6-INCH
XLPHMASW6
HMA SW6LP
5 LF SAWING CONCRETE
5 LF SAWING CONCRETE5 LF SAWINGCONCRETE
3
5
BASE PROJECT: REPLACE FROM POINTS51-52 WITH 6" CONCRETE SIDEWALKMANDATORY ALTERNATE #1: REPLACE FROMPOINTS 51-52 WITH HOT MIX ASPHALT
1.5%0.7%
1.5%1.1%1.3% 10.0'10.0'
SW61.5%1.5%3.9%5.3%
3.9'
3.9'LP RESET INLET COVER
WISDOT/CADDS SHEET 42EHWY:COUNTY:P:\2025\2025.024 - EAGLE RIVER REVIT PROGRAM-GHT-USH 45 CROSSING\CAD\PLANS\021301-CR.DWGFILE NAME : 5/14/2026 11:44 AMPLOT DATE :PLOT BY :AARON J. WALLNER
2
PROJECT NO: PLOT NAME :
2
SHEET PLOT SCALE :1 IN:10 FT2025.024USH 45VILASCURB RAMP DETAILSLAYOUT NAME - 02
GENERAL NOTES-PROPERTY LINES ARE BASED ON 2025 GIS DATA FROM VILAS COUNTY.-AERIAL IMAGE IS FROM 2025 MICROSOFT MAP DATA.-SEE PLAN SHEETS FOR HMA GRADING
EL
OH
OH
OH
OH
OH
OH
OH
OH
FO FO FO FO FO FOFOFO FO FO FO FO
FO
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX B
XXXXXXXXXXXXXXXX
XXXXXXXXXX
RIVERVIEW PARKW RIVERVIEW ST
GIS PROPERTY LINE (TYP.)
PRIVATE PROPERTY
USH 45/STH 32/ STH 17
RIVERVIEW PARK
104+50
105+00
105+30
PI: 104+38.49
PC: 104+89.42
PT: 105+09.85
27 LF SAWING ASPHALTCURB RAMP DETECTABLEWARNING FIELD YELLOWCONCRETE CURB ANDGUTTER 30-INCH TYPE L150151152 153154155156157
158159
160161 6.8'6.6'6.7'6.6'
NW Curb RampPOINT NUMBER150151152153154155156157158159160161
STATION104+38.41104+35.93104+33.93104+34.13104+36.13104+38.49104+45.20104+45.21104+38.49104+38.45104+45.22104+45.24
OFFSET11.60' LT11.58' LT11.56' LT11.64' RT11.62' RT11.60' RT11.57' RT5.00' RT5.00' RT5.00' LT5.00' LT11.61' LT
ELEVATION1636.361636.111636.131635.951635.931636.081636.361635.991635.881636.011636.111636.59
NORTHING106686.62106687.29106687.83106710.16106709.62106708.94106707.04106700.73106702.60106692.97106691.11106684.76
EASTING500945.09500947.48500949.40500943.09500941.17500938.78500932.30500934.11500940.59500943.31500936.87500938.68
175176177178179180181182183184
185186
190
187188
189
10.0'5.0'3.2'
North HMA Curb RampPOINT NUMBER175176177178179180181182183184185186187188189190
STATION105+19.42105+19.43105+19.68105+19.69105+16.53105+11.53105+09.29105+04.51104+89.19104+89.17105+16.27105+11.27105+07.10105+07.08104+89.42104+87.99
OFFSET5.50' RT5.00' RT5.00' LT5.50' LT5.08' LT5.21' LT5.24' LT5.21' LT5.00' LT15.00' LT4.91' RT4.79' RT4.76' RT5.08' RT5.00' RT16.72' LT
ELEVATION1636.741636.741636.811636.811636.841636.891636.911636.941637.050.001636.781636.841636.901636.901636.940.00
NORTHING106658.26106658.29106658.75106658.78106661.90106666.89106668.94106672.02106678.95106669.34106661.44106666.43106671.48106671.54106688.49106668.02
EASTING500877.41500877.91500887.89500888.39500887.75500887.52500887.42500887.77500894.62500897.41500877.77500877.53500877.53500877.22500891.63500899.01
7.2%
5.2% 2.9%
5.7%1.5%1.5%
1.2%
1.0%1.0%
1.2%0.6%0.5%
LP
HMA
7A
SW6
LEGENDCURB RAMP TYPEADA COMPLIANT LANDING PAD3" HOT MIX ASPHALTCONCRETE SIDEWALK 6-INCH
XLPHMASW6
HMALP3 SLOPE INTERCEPT (TYP.)
R10' R20'
R22'
RESET INLET COVER6.7'3.4%10.0'1.3%4.3%
1.0%
GENERAL NOTES-PROPERTY LINES ARE BASED ON 2025 GIS DATA FROM VILAS COUNTY.-AERIAL IMAGE IS FROM 2025 MICROSOFT MAP DATA.-SEE PLAN SHEETS FOR HMA GRADING WISDOT/CADDS SHEET 42EHWY:COUNTY:P:\2025\2025.024 - EAGLE RIVER REVIT PROGRAM-GHT-USH 45 CROSSING\CAD\PLANS\021301-CR.DWGFILE NAME : 5/14/2026 12:45 PMPLOT DATE :PLOT BY :AARON J. WALLNER
2
PROJECT NO: PLOT NAME :
2
SHEET PLOT SCALE :1 IN:10 FT2025.024USH 45VILASCURB RAMP DETAILSLAYOUT NAME - 03
EL
SMP
WV
WVWV
MH MH
OH
OH
OH
FOFO
FO
FO
FOFOFOB
B
W16-9P
B
B
B
W16-9P
B
PRIVATE PROPERTY
PRIVATEPROPERTY
PRIVATE PROPERTY
PRIVATE PROPERTYPRIVATE PROPERTYPRIVATE PROPERTY
PRIVATE PROPERTY
CITY OF EAGLE RIVER
PRIVATE PROPERTY
CITY OF EAGLE RIVER
GIS PROPERTY LINE (TYP.)
160'
W DIVISION ST
W RIVERVIEW ST
RIVERVIEW PARK
USH 45/STH 32/ STH 17
USH 45/STH 32/ STH 17 RAILROAD ST
E SPRUCE ST
PEDESTRIANSBICYCLESPROHIBITEDMOTOR BICYCLESNON MOTORIZED TRAFFICR5-57PEDESTRIANSBICYCLESPROHIBITEDMOTOR BICYCLESNON MOTORIZED TRAFFICR5-5736"X36"36"X36"
W11-15W11-1530"X30"30"X30"AHEADW16-9PW16-9PAHEAD24"X12"24"X12"
BIKE ROUTED11-1D11-1BIKE ROUTE24"X18"24"X18"
W11-15W11-1530"X30"30"X30"AHEADW16-9PW16-9PAHEAD24"X12"24"X12"
STAY ONSIDEWALK30"x12"21"X21"21"X21"M6-1M6-1
BIKE ROUTED11-1D11-1BIKE ROUTE24"X18"24"X18"STAY ONSIDEWALK30"x12"21"X21"21"X21"M6-1M6-1
SEE CONSTRUCTIONDETAILS FOR SIGNAGEMOUNTED TO GATE
SEE CONSTRUCTIONDETAILS FOR SIGNAGEMOUNTED TO GATE
SALVAGED "NO RIGHTTURN" SIGN
160'
105+30
100+00
101+00
102+00
103+00104+00
105+00
PI: 100+89.53
PI: 102+75.92
PI: 104+38.49
PC: 103+56.67
PC: 104+89.42
PT: 103+67.99
PT: 105+09.85
0102
03
040506
07
08
09
1011
12
Sign Post LocationsPOINT NUMBER010203040506070809101112
STATION100+20.32100+36.23102+34.82102+61.60102+72.72103+49.09103+62.27101+99.73104+48.70104+52.40104+71.87104+91.91
OFFSET8.62' LT7.51' LT25.86' LT7.76' LT10.14' LT6.83' LT17.69' RT40.99' LT164.64' RT10.83' RT20.49' RT22.81' RT
NORTHING106447.78106451.43106591.45106622.35106632.29106702.21106731.80106553.47106853.16106704.34106708.23106703.37
EASTING501038.22501053.75501039.78501049.29501043.76501016.25501023.19501035.54500886.58500925.59500904.21500880.83
SIGNS 1-5 REPRESENT VARIOUS SNOWMOBILE SIGNSTO BE RELOCATED. CONTRACTOR TO INSTALL PERGUIDANCE FROM THE CITY OF EAGLE RIVER
STAY ONSIDEWALK30"x12"21"X21"21"X21"M6-1M6-1
W11-15W11-1530"X30"30"X30"
SHEET
2
PLOT NAME : PROJECT NO:
2
AARON J. WALLNERPLOT BY :PLOT DATE :5/14/2026 12:52 PMFILE NAME :P:\2025\2025.024 - EAGLE RIVER REVIT PROGRAM-GHT-USH 45 CROSSING\CAD\PLANS\023201-PS.DWGCOUNTY:HWY: EWISDOT/CADDS SHEET 42PLOT SCALE :1 IN:40 FT2025.024USH 45VILASPERMANENT SIGNAGELAYOUT NAME - 01
NOTES-PROPERTY LINES ARE BASED ON 2025 GIS DATA FROMVILAS COUNTY.-AERIAL IMAGE IS FROM 2025 MICROSOFT MAP DATA-SEE CONSTRUCTION DETAILS FOR "STAY ON SIDEWALK"SIGN SPECIFICS
EL
WVMH MH
OH
OH
OH
FOFOFO
FOFOFOB
B
W16-9P
B
B
B
W16-9P
B
105+30
103+00
104+00
105+00
PI: 104+38.49
PC: 103+56.67
PC: 104+89.42
PT: 103+67.99
PT: 105+09.85
E
W20-1AWORKROADAHEADWORKROADAHEADW20-1A
TYPE III BARRICADECLOSEDLANER11-2LR11-2LCLOSEDLANE48"X30"48"X30"
G20-2AENDROAD WORKENDROAD WORKG20-2A48"X24"48"X24"
125'50'200'200'
SIGN TO BE INSTALLED 200'NORTH OF "RIGHT LANECLOSED AHEAD" SIGN
W20-55AAHEADLEFT LANECLOSEDAHEADLEFT LANECLOSEDW20-55A WO4-2LWO4-2L
15'210'
SHEET
2
PLOT NAME : PROJECT NO:
2
AARON J. WALLNERPLOT BY :PLOT DATE :5/14/2026 1:23 PMFILE NAME :P:\2025\2025.024 - EAGLE RIVER REVIT PROGRAM-GHT-USH 45 CROSSING\CAD\PLANS\025100-TC_STAGE2.DWGCOUNTY:HWY: EWISDOT/CADDS SHEET 42PLOT SCALE :1 IN:50 FT2025.024USH 45VILASTRAFFIC CONTROL: INSIDE LANE CLOSURELAYOUT NAME - Stage 2 (N)
SMP
WVWV
OH
FO
105+30
100+00
101+00
102+00
PI: 100+89.53
PC: 104+89.42
PT: 105+09.85
S
S
S
E
W20-1AWORKROADAHEADWORKROADAHEADW20-1A
W20-1AWORKROADAHEADWORKROADAHEADW20-1A
W20-1AWORKROADAHEADWORKROADAHEADW20-1A
G20-2AENDROAD WORKENDROAD WORKG20-2A48"X24"48"X24"
114'
25'
125'125'
200' (TYP)125'50'
WO4-2LWO4-2LW20-55AAHEADLEFT LANECLOSEDAHEADLEFT LANECLOSEDW20-55A
SHEET
2
PLOT NAME : PROJECT NO:
2
AARON J. WALLNERPLOT BY :PLOT DATE :5/14/2026 1:23 PMFILE NAME :P:\2025\2025.024 - EAGLE RIVER REVIT PROGRAM-GHT-USH 45 CROSSING\CAD\PLANS\025100-TC_STAGE2.DWGCOUNTY:HWY: EWISDOT/CADDS SHEET 42PLOT SCALE :1 IN:50 FT2025.024USH 45VILASTRAFFIC CONTROL: INSIDE LANE CLOSURELAYOUT NAME - Stage 2 (S)
EL
WVMH MH
OH
OH
OH
FOFOFO
FOFOFOB
B
W16-9P
B
B
B
W16-9P
B
105+30
103+00
104+00
105+00
PI: 104+38.49
PC: 103+56.67
PC: 104+89.42
PT: 103+67.99
PT: 105+09.85
E
W20-1AWORKROADAHEADWORKROADAHEADW20-1A
W20-5AAHEADRIGHT LANECLOSEDAHEADRIGHT LANECLOSEDW20-5A WO4-2RWO4-2R TYPE III BARRICADECLOSEDLANER11-2LR11-2LCLOSEDLANE48"X30"48"X30"
G20-2AENDROAD WORKENDROAD WORKG20-2A48"X24"48"X24"
225'50'60'200'200'
SIGN TO BE INSTALLED 200'NORTH OF "RIGHT LANECLOSED AHEAD" SIGN
TEMPORARY PEDESTRIAN DETOUR
TEMPORARY PEDESTRIAN DETOUR
SHEET
2
PLOT NAME : PROJECT NO:
2
AARON J. WALLNERPLOT BY :PLOT DATE :5/14/2026 1:23 PMFILE NAME :P:\2025\2025.024 - EAGLE RIVER REVIT PROGRAM-GHT-USH 45 CROSSING\CAD\PLANS\025100-TC.DWGCOUNTY:HWY: EWISDOT/CADDS SHEET 42PLOT SCALE :1 IN:50 FT2025.024USH 45VILASTRAFFIC CONTROL: OUTSIDE LANE CLOSURELAYOUT NAME - Stage 1 (N)
SMP
WVWV
OH
FO
105+30
100+00
101+00
102+00
PI: 100+89.53
PC: 104+89.42
PT: 105+09.85
S
S
S
E
W20-1AWORKROADAHEADWORKROADAHEADW20-1A
W20-1AWORKROADAHEADWORKROADAHEADW20-1A
W20-1AWORKROADAHEADWORKROADAHEADW20-1A
W20-5AAHEADRIGHT LANECLOSEDAHEADRIGHT LANECLOSEDW20-5AWO4-2RWO4-2R
G20-2AENDROAD WORKENDROAD WORKG20-2A48"X24"48"X24"
114'
25' 125'125'
200' (TYP)125'50'
TEMPORARY PEDESTRIAN DETOUR
SHEET
2
PLOT NAME : PROJECT NO:
2
AARON J. WALLNERPLOT BY :PLOT DATE :5/14/2026 1:22 PMFILE NAME :P:\2025\2025.024 - EAGLE RIVER REVIT PROGRAM-GHT-USH 45 CROSSING\CAD\PLANS\025100-TC.DWGCOUNTY:HWY: EWISDOT/CADDS SHEET 42PLOT SCALE :1 IN:50 FT2025.024USH 45VILASTRAFFIC CONTROL: OUTSIDE LANE CLOSURELAYOUT NAME - Stage 1 (S)
S MPWV
COMMERCIAL DRIVEWAY
100+00
101+00
102+00R25.0
N72°47'55"E89.53'
N16°57'07"W186.39'
PI: 100+89.53
R38.0
R50.0-0.83%
-2.79% -2.42%
-1.02%
-1.00%-1.00%
-1.00%
-1.00%
-0.72%
-2.14%
-2.14%
-0.31%0.11% -0.47%
-1.00%-1.00%
-1.00%
-2.56%
USH 45/STH 32/ STH 17
RE-ALIGNED SNOWMOBILE TRAIL
1637.0
1637.51637.5
1636.81636.9
1637.11637.21637.31637.4
1637.5
1637.21637.3
1637.4
1637.61637.7
1637.01637.11637.21637.31637.4
1637.01636.81636.91637.11637.21637.3
1637.5
1637.21637.31637.4
1637.6
1637.7
1637.7
1637.7
1637.0
1637.5
1636.81636.91637.11637.2
1637.3
1637.4
1637.6
SEE CURB RAMP SHEETS FORGRADES FROM B.O.P - STA 100+60
EXISTING SIDEWALK TO REMAIN. CONTRACTORTO PAVE AGAINST EDGE OF SIDEWALK.
EXISTING SIDEWALKTO REMAIN
GRADING/ RESTORATIONLIMITS (TYP.)STA 100+59.30, -0.06' LTEL 1637.42
STA 100+27.70, -24.71' LTEL 1637.70
STA 100+39.64, -18.69' LTEL 1637.62
STA 100+50.78, -5.54' LTEL 1637.53STA 100+49.22, -38.45' LTEL 1637.59
STA 100+59.47, -5.05' LTEL 1637.46
STA 101+19.44, -5.17' LTEL 1637.16
STA 101+79.14, -15.88' LTEL 1637.20
STA 101+84.33, -26.71' LTEL 1637.32STA 102+00.73, -22.98' LTEL 1637.17
STA 102+00.73, -10.98' LTEL 1637.05STA 102+00.71, -5.54' LTEL 1636.88STA 101+88.97, -12.38' LTEL 1637.11
STA 100+38.66, -44.19' LTEL 1637.71
STA 100+59.49, -30.05' LT
STA 100+75, -10.44' LTEL 1637.37STA 101+10, -7.02' LTEL 1637.25STA 101+50, -5.24' LTEL 1637.06STA 101+75, -5.19' LTEL 1636.99
STA 101+50.80, -29.42' LTEL 1637.44
STA 101+56.26, -40.15' LTEL 1637.56
-1.00%
PLOT SCALE :1 IN:10 FTWISDOT/CADDS SHEET 44EHWY:COUNTY:P:\2025\2025.024 - EAGLE RIVER REVIT PROGRAM-GHT-USH 45 CROSSING\CAD\PLANS\050201-PN.DWGFILE NAME : 5/14/2026 2:47 PMPLOT DATE :PLOT BY :AARON J. WALLNER
5
PROJECT NO: PLOT NAME :
5
SHEET LAYOUT NAME - 012025.024USH 45VILASGRADING & EROSION CONTROL
WVMH
OH
OH
OH
OH
OH
OH
FOFO
FO
FOFO
FO
B
B
RAILROAD ST
USH 45/STH 32/ STH 17
103+00
104+00
N24°15'08"W80.75'
S74°43'10"W70.50'
CURVE 1PI STA = 103+63.51Y = 106718.166X = 501016.558D = 716°11'50"T = 6.84'L = 11.31'R = 8.00'PC STA = 103+56.67Y = 106711.933X = 501019.366PT STA = 103+67.99Y = 106716.365X = 501009.963DB = N24°15'08"WDA = S74°43'10"W
LTDELTA = 81°01'41"
PI: 102+75.92 PC: 103+56.67
PT: 103+67.99-1.06%-2.68%
-1.00% -0.54%-0.58% -1.04%-2.10% -1.00%
-1.00%-0.34%-0.65%-3.02% -1.77% -2.57%
R50.0
R38.0
BM HYD NW BOLT1638.661637.0
1636.71636.81636.9
1637.1
1636.61636.71636.81636.9
EXISTING SNOWMOBILE TRAILCROSSING GRADES TO REMAIN
SEE CURB RAMPSHEETS FOR GRADES
SEE CURB RAMPSHEETS FOR GRADES
GRADING/ RESTORATIONLIMITS (TYP.)SEE CURB RAMPSHEETS FOR GRADES
STA 102+50.36, -11.80' LTEL 1636.93
STA 102+50.37, -23.80' LTEL 1637.05
STA 102+58.24, -24.62' LTEL 1636.97
STA 102+81.33, -20.09' LTEL 1636.86
STA 102+49, -33.46' LTEL 1636.79STA 102+48.73, -32.07' LTEL 1636.84
STA 102+69.50, -5.07' LTEL 1636.52
RECTANGULAR RAPID FLASHING BECANSTA 103+60.82, -5.52' LT
RECTANGULAR RAPID FLASHING BECANMEDIAN PUSH BUTTON ASSEMBLYSTA 104+04.22, -6.83' LT
CENTER OF GATE POSTSTA 102+54.96, -25.13' LT
CENTER OF GATE POSTSTA 102+56.27, -8.89' LT
STA 102+50, -5.26' LTEL 1636.62STA 102+25, -5.31' LTEL 1636.75
STA 103+00, -5.85' LTEL 1636.58
STA 103+25, -5.86' LTEL 1636.63
PLOT SCALE :1 IN:10 FTWISDOT/CADDS SHEET 44EHWY:COUNTY:P:\2025\2025.024 - EAGLE RIVER REVIT PROGRAM-GHT-USH 45 CROSSING\CAD\PLANS\050201-PN.DWGFILE NAME : 5/14/2026 2:54 PMPLOT DATE :PLOT BY :AARON J. WALLNER
5
PROJECT NO: PLOT NAME :
5
SHEET LAYOUT NAME - 022025.024USH 45VILASGRADING & EROSION CONTROL
OHOHOHOHOHOHOHOHOHOH
FO
FO
FO
FO
FO
FO
FO
FO
FO
B
B
USH 45/STH 32/ STH 17
RIVERVIEW PARK
GIS PROPERTY LINE (TYP.)
RIVERVIEW PARK
105+30
104+00
105+00 S73°55'55"W50.93'
S4°06'07"E19.71'CURVE 2PI STA = 105+01.57Y = 106680.325X = 500881.336D = 381°58'19"T = 12.15'L = 20.43'R = 15.00'PC STA = 104+89.42Y = 106683.689X = 500893.016PT STA = 105+09.85Y = 106668.202X = 500882.206DB = S73°55'55"WDA = S04°06'07"E
LTDELTA = 78°02'02"
PI: 104+38.49PC: 104+89.42PT: 105+09.85
R10.0R10.0
-1.00%
-1.00%
-1.04%-1.00%
0.65%
-1.35%
1636.5
1636.2
1636.3
1636.4
1636.61636.71636.8
1636.51637.0 1636.41636.61636.71636.81636.9
1636.51636.31636.41636.61636.71636.81636.9
1636.5
1636.6
GRADING/ RESTORATIONLIMITS (TYP.)
SEE CURB RAMPSHEETS FOR GRADES
SEE CURB RAMPSHEETS FOR GRADES
EXISTING SNOWMOBILE TRAILCROSSING GRADES TO REMAIN
RECTANGULAR RAPID FLASHING BECANMEDIAN PUSH BUTTON ASSEMBLYSTA 104+04.22, -6.83' LT
STA 104+49.48, 5.01' RTEL 1636.15
STA 104+59.10, 14.97' RTEL 1636.39
STA 104+59.19, 35.60' RTEL 1636.56
STA 104+69.16, 35.48' RTEL 1636.66
STA 104+69.11, 15.03' RTEL 1636.49
STA 104+76.01, 22.76' RTEL 1636.44
STA 104+76.13, 35.47' RTEL 1636.29
STA 104+79.11, 15.00' RTSTA 104+69.88, 11.15' RTEL 1636.57STA 104+88.35, 5.00' RTEL 1636.95
STA 104+78.28, -5.22' LTEL 1637.03STA 104+69.93, -5.00' LTEL 1636.76
STA 104+52.52, -5.00' LTEL 1636.39CENTER OF GATE POSTSTA 104+47.56, -6.40' LTCENTER OF GATE POSTSTA 104+58.52, -18.46' LTSTA 104+45.25, -11.91' LTEL 1636.75
RECTANGULAR RAPID FLASHING BECANSTA 104+39.68, 6.11' RTSTA 104+79.05, 5.00' RTEL 1636.97-3.23%-2.12%
STA 104+49.10, 15.00' RT
PLOT SCALE :1 IN:10 FTWISDOT/CADDS SHEET 44EHWY:COUNTY:P:\2025\2025.024 - EAGLE RIVER REVIT PROGRAM-GHT-USH 45 CROSSING\CAD\PLANS\050201-PN.DWGFILE NAME : 5/14/2026 2:56 PMPLOT DATE :PLOT BY :AARON J. WALLNER
5
PROJECT NO: PLOT NAME :
5
SHEET LAYOUT NAME - 032025.024USH 45VILASGRADING & EROSION CONTROL
... . ...
. .. ... .
.....
.
..
.
... . ...
. .. ... .
.....
.
..
.
..
...
.. ..
. ..... ...
. .. ... .
.... .
.
..
. .
... . ...
. .. ... .
.....
.
..
.. . . ...
... . ...
. .. .....
.
... ...
. .. ....
..
. .
.
..
. ... ..
(TYPICAL FOR ALL CURB & GUTTER TYPES)
... ...
. .. ... .
.....
.
..
.
. ..
.
... ...
. .. ... .
.....
.
..
. ...
....
. ....
..
...... .......... .
.....
... ....
.........
... ...
....... ....
.
.
.
..
. .. . ...
.
12'15'10" & ABOVELESS THAN 10"
... . ....
. .. ... .
.... .
.
..
.
. .....
..... .... ...
. ..... ..... .
.
. ...
.
...
.
.
GENERAL NOTES
12
CONCRETE CURB AND GUTTER 30"REVERSE SLOPE GUTTER
CONCRETE CURB AND GUTTER 18"CONCRETE CURB AND GUTTER
PARTIAL SECTION OF PAVEMENTWITH INTEGRAL CURB AND GUTTER
TYPES K & L
CONCRETE CURB AND GUTTER 36"TYPES K & L
4" SLOPED CURB TYPES G & J
6" SLOPED CURB TYPES G & J
TYPES A & D
6" SLOPED CURB TYPES A & D
4" SLOPED CURB TYPES A & D
4" SLOPED CURB TYPES R & TCONCRETE CURB AND GUTTER 30"
PAVEMENT THICKNESSAND MAXIMUM CONCRETEPANEL WIDTH TABLE
TYPES A & D345678
TYPES TBT & TBTT
PAVEMENTTHICKNESSMAXIMUM PANELWIDTH
22"28"36"30"TBT & TBTTX
1
(OPTIONAL CURB SHAPE)1
1
1
1 6" MIN.
6" 2' - 0"
6" 734" MAX. R.2" R.12"/FT. BATTER CURB FACE
6" MIN.
6" MIN.
6" MIN.
6" MIN.
8" MIN.6" MIN.
6" MIN.
2"6" 22"1" R.1" R.14" MAX. R.74"6"
2
2
272"4"5"3" 22"14" MAX. R.1" R.
6"
5"2" - 3" R.6"
73" R.6" 2' - 0"6" 2
27
6"1' - 0"
34" MAX. R.2" R.6"
1
4"
6" 7
1' - 0"2' - 0"10" R.
6
5"1' - 0"2' - 0"2" - 3" R.7
2
231
1
1
4" 4
4"9" 17"76" R. SAME SLOPE ASADJACENT PAVEMENT
4"
1
78" X
PAVEMENTTHICKNESS6" MIN.7SAME PAY LIMITSAS CURB AND GUTTERTRAFFIC LANETRAFFIC LANE8CONCRETE PANEL WIDTH8
**BIKE LANE IS NOT SHOWN
PAVEMENT SLOPE
6" MIN.
...
STATE OF WISCONSINDEPARTMENT OF TRANSPORTATIONCONCRETE CURB AND GUTTER
516" R.
DETAILS OF CONSTRUCTION AND WORKMANSHIP NOT SHOWN ON THIS DRAWING SHALL CONFORMTO THE PERTINENT REQUIREMENTS OF THE CONTRACT.PAVEMENT TIES AND TIE BARS SHALL BE EPOXY COATED IN CONFORMANCE WITH SUBSECTION505.2.6.2 OF THE STANDARD SPECIFICATIONS.INTEGRAL CURB AND GUTTER SHALL CONFORM TO THE DETAILS SHOWN FOR CONCRETE CURB ANDGUTTER INCLUDING THE TRANSVERSE GUTTER SLOPE.UNLESS OTHERWISE SHOWN ON THE TYPICAL CROSS SECTIONS, THE BASE AGGREGATE AND COMMONEXCAVATION LIMITS ARE 2' - 0" BEHIND THE BACK OF CURBS.TIE BARS ARE REQUIRED FOR CURB AND GUTTERS TYPES A, G, K, R, AND TBTT.THE BOTTOM OF CURB AND GUTTER MAY BE CONSTRUCTED EITHER LEVEL OR PARALLEL TO THE SLOPEOF THE SUBGRADE OR BASE AGGREGATE PROVIDED A 6" MINIMUM GUTTER THICKNESS IS MAINTAINED.USE 8" MINIMUM GUTTER THICKNESS WHEN USED WITH AN ADJACENT CONCRETE TRUCK APRON PLACED BEHINDBACK OF CURB.THE BOTTOM OF CURB AND GUTTER MAY BE CONSTRUCTED EITHER LEVEL OR PARALLEL TO THE SLOPEOF THE SUBGRADE OR BASE AGGREGATE PROVIDED A 8" MINIMUM GUTTER THICKNESS IS MAINTAINED.UNLESS OTHERWISE NOTED, FOR STAKING PURPOSES THE FACE OF CURB IS 6" FROM THE BACK OF CURB.WHEN REVERSE SLOPE GUTTER IS REQUIRED, THE LOCATION(S) WILL BE SHOWN ELSEWHERE IN THE PLAN.USE 4% GUTTER CROSS SLOPE UNLESS OTHERWISE NOTED IN THE PLANS.INCLUDE LONGITUDINAL JOINT AND TIE BARS ALONG LANE EDGE WHEN CONCRETE PANEL WIDTH EXCEEDSTHE MAXIMUM WIDTH PER TABLE BELOW. LONGITUDINAL JOINT(S) ARE NOT ALLOWED WITHIN TRAFFICLANES AND BIKE LANES. LONGITUDINAL JOINT MAY BE SAWED.
3" SLOPED CURB TYPES R & T18" MIN.43" 17"9"4" 95
9SLOPE TO BE REVERSE SLOPE MATCHING THE SLOPE OF THE PAVEMENT AND THECIRCULATORY ROADWAY
9.75" R.20" R.
6SDD
SDD
6
08D01-24a
08D01-24a
GENERAL NOTES
1210
.. .. . .
.
.
..
... ...
. .. ... .
..
..
.
..
. ... ..
.....
.. .. ... .
.....
.
..
.. ..
...
.... . .
*
.. ..... . . . .. .
.. .
.
..
. . . ...
......
.........
.
....... ..
...... .
NEWCONCRETE
PAVEMENT
.. ..... . . . .. .
.. .
. TYPICAL TIE BAR LOCATION
2ENTRANCE CURBSLOPE VARIABLEADJACENTPAVEMENT
NO. 4 X 2' - 0" TIE BARSSPACED 3' - 0" C-C
CONCRETE CURBTYPES A & D1 TYPES G & J1
(TYPICAL H INLET COVER SHOWN)DETAIL OF CURB AND GUTTER AT INLETSEND SECTION CURB AND GUTTER
ADJACENTPAVEMENT
(WHEN DIRECTED BY THE ENGINEER)DRIVEWAY ENTRANCE CURB
6" MIN.
12 THICKNESSOF GUTTER
10
1' - 0"6" CONCRETE CURBAND GUTTER
6"
3"
2" R.12"/FT. BATTER, FACE OF CURB(ABOVE ADJACENT PAVEMENT)6"18" 1 12" R. 1 12" R.ADJACENTPAVEMENT4" 4"6"6"18" 4"2"4"1" R.1" R.
3" NO. 4 X 2' - 0" DEF. TIE BARSSPACED 3' - 0" C-CNO. 4 X 2' - 0" DEF. TIE BARSSPACED 3' - 0" C-C
NEWCONCRETE
12 THICKNESS OFNEW CONCRETEEXISTINGCONCRETE
EXISTINGCONCRETE
AA
NEW CURB AND GUTTER,SURFACE DRAINS,CONCRETE PAVEMENT OROTHER NEW CONCRETE.*
6"6"*
TIE BARS DRILLEDINTO EXISTING PAVEMENTSECTION A - A
PLAN VIEWNO. 6 TIE BARS SPACED 2' - 6" C-C,INSTALLED PERPENDICULAR TO THELONGITUDINAL JOINTMAXIMUM DRILL HOLESIZE IS 18" GREATERTHAN TIE BAR DIAMETER
1
CONTRACTIONJOINT
6' - 0" MIN.
PAVEMENT EDGE
FLOWLINE
DEPRESS BELOW NORMALFLOWLINE TO MATCH GRATEELEVATION
VAR. 3' NOR.
CURB AND GUTTERTYPE AFLOWVAR. 3' NOR.
STATE OF WISCONSINDEPARTMENT OF TRANSPORTATIONAPPROVEDDATEROADWAY STANDARDS DEVELOPMENTUNIT SUPERVISOR/S/FHWA
CONCRETE CURB, TIESAND CURB AND GUTTERAPPLICATIONS
February 2025Rodnery Taylor
... ...
. .. ... .
..
..
.
..
. ... ..
EXPANSION JOINT DETAIL FOR VERTICALCURB ABUTTING A RIGID STRUCTURE
1" EXPANSION JOINT MATERIALCONFORMING TO ASTM D8139
CONCRETE CURBAND GUTTER
VERTICAL FACE CONCRETE CURB
11
1"
RIGID CONCRETE STRUCTURE
THICKNESS VARIESSEE PLAN
11
11
DETAILS OF CONSTRUCTION AND WORKMANSHIP NOT SHOWN ON THIS DRAWING SHALL CONFORMTO THE PERTINENT REQUIREMENTS OF THE CONTRACT.PAVEMENT TIES AND TIE BARS SHALL BE EPOXY COATED IN CONFORMANCE WITH SUBSECTION505.2.6.2 OF THE STANDARD SPECIFICATIONS.UNLESS OTHERWISE SHOWN ON THE TYPICAL CROSS SECTIONS, THE BASE AGGREGATE AND COMMONEXCAVATION LIMITS ARE 2' - 0" BEHIND THE BACK OF CURBS.TIE BARS ARE REQUIRED FOR CURB AND GUTTERS TYPES A, G, K, R, AND TBTT.THE BOTTOM OF CURB AND GUTTER MAY BE CONSTRUCTED EITHER LEVEL OR PARALLEL TO THE SLOPEOF THE SUBGRADE OR BASE AGGREGATE PROVIDED A 6" MINIMUM GUTTER THICKNESS IS MAINTAINED.REFER TO SDD 08D18 AND 08D19 FOR ADDITIONAL DRIVEWAY ENTRANCE CURB DETAILS.PLACE 1" THICK EXPANSION JOINT MATERIAL BETWEEN VERTICAL FACE CURB TYPES EXTENDING FROM THETOP OF CURB TO 1 INCH BELOW THE ADJOINING CONCRETE SURFACE. RIGID CONCRETE STRUCTURESINCLUDE RAISED CONCRETE MEDIANS, CONCRETE SAFETY ISLANDS, SPLITTER ISLANDS, OR LOCATIONSIDENTIFIED ON THE PLANS.
08D01-24b
08D01-24b
6SDD
SDD
6
DETECTABLE WARNING FIELDS THAT ARE INSTALLED AS A GROUP OR SIDE BY SIDE SHALL BE FROM THE SAME
MANUFACTURER.
GENERAL NOTES
8
7
9
1.5% CROSS
SLOPE
7% DES. MAX.
3
2' - 0"
MAXIMUM 2.1% SLOPE IN ALL DIRECTIONS IN
FRONT OF GRADE BREAK
12" EXPANSION JOINT SIDEWALK
CONTRACTION JOINT SIDEWALK
PAVEMENT MARKING CROSSWALK (WHITE)
LEGEND
.
.. . .
.
. . .
. . . ...... ..
..
.
. .. .
.. . . .. . . ... . . . . .. .
. . .. . . .
...
.
.. . . . .. .
.
. . . .. ...
. . . .. ... . . .. . ...
.
VIEW C - C FOR TYPE 3
SECTION B - B FOR TYPE 3
SECTION A - A FOR TYPE 2
CURB RAMP TYPE 2
PLAN VIEW
(CENTER OF CORNER RADIUS)
CONCRETE
SIDEWALK
TERRACE
MATCH EXISTING
SIDEWALK (TYP.)
5' - 0 "
MIN.
4
10' MAX.
TERRACE CONCRETE
SIDEWALK
5' - 0"
MIN. 4
1.5%
SLOPE
SLOPE
VARIABLE
4
1.5%
SLOPE
4
SLOPE
VARIABLE
CONCRETE
SIDEWALK
TERRACE
MATCH EXISTING
SIDEWALK (TYP.)
SLOPE
VARIABLE
1.5%
SLOPE
4
1.5% SLOPE
4
TERRACE CONCRETE
SIDEWALK
SLOPE
VARIABLE
** **
** **
5' - 0"
MIN.
A A
B B
DETECTABLE
WARNING
FIELD (TYP.)
CURB RAMP TYPE 3
PLAN VIEW
(OUTSIDE OF CROSSWALK AREA)
C C
5' - 0" MIN.
SLOPE
'A' OR 'B'
TERRACE LANDING
DETECTABLE WARNING
FIELD (SEE SDD 8D5-g)
** **
LANDING
2' - 0"
TERRACE LANDING
** **
DEPRESSED
CURB & GUTTER
TOP OF
ROADWAY
DETECTABLE WARNING
FIELD (SEE SDD 8D5-g)
EXPANSION
JOINT
CLEAR
AREA
2
2
DEPRESSED
CURB & GUTTER
TOP OF
ROADWAY
7%
DES.
MAX.
*
38
2' - 0"7
1.5%
9
8*
10: MAX.
FLARE
10: MAX.
FLARE
8*
9
DETECTABLE
WARNING
FIELD (TYP.)
CONCRETE CURB
PEDESTRIAN
6"
SEE DETAIL B
DETAIL B
SEE DETAIL A
DETAIL A
SEE DETAIL B
3' CURB
TAPER WITH
6" CURB
5' - 0 "
MIN. 3' CURB TAPER
WITH 6" CURB
**
**
**
**
STATE OF WISCONSIN
DEPARTMENT OF TRANSPORTATION
CURB RAMPS
TYPE 2 AND 3
(PLANTING OR
NON-TRAVERSABLE
SURFACE SHOWN)
CONCRETE
SIDEWALK OR
OTHER
TRAVERSABLE
SURFACE
CONCRETE SIDEWALK
OR OTHER TRAVERSABLE
SURFACE
CONCRETE
SIDEWALK OR
OTHER
TRAVERSABLE
SURFACE
(PLANTING OR
NON-TRAVERSABLE
SURFACE SHOWN)
6:1 NON-
TRAVERSABLE
FLARE
10:1
TRAVERSABLE
FLARE
10:1
TRAVERSABLE
FLARE
10:1
TRAVERSABLE
FLARE
RADIUS
VARIABLE
RADIUS
VARIABLE
10:1
TRAVERSABLE
FLARE
5'-0"
MAX. 7
CONCRETE SIDEWALK
OR OTHER TRAVERSABLE
SURFACE
NON-TRAVERSABLE FLARE
TRAVERSABLE FLARE
OPTIONAL CURB RETURN. USE
WHEN NON-TRAVERSABLE UNABLE
TO BE CONSTRUCTED. CAN USE
STRAIGHT RETURNS OR 24" RADIUS.
6:1 NON-
TRAVERSABLE
FLARE
MINIMUM 2-INCH
CURB HEIGHT
MINIMUM 6-INCH
WIDTH
CONSTRUCT 6" WEDGE TO AVOID
CONCRETE BREAKAGE
++
++++
++
++
++
++
++
++
AVOID PLACING DRAINAGE STRUCTURES, JUNCTION BOXES OR OTHER OBSTRUCTIONS IN FRONT OF
CURB RAMP ACCESS AREAS.
DETAILS OF CONSTRUCTION, MATERIALS AND WORKMANSHIP NOT SHOWN ON THIS DRAWING SHALL CONFORM TO
THE PERTINENT REQUIREMENTS OF THE STANDARD SPECIFICATIONS AND THE APPLICABLE SPECIAL PROVISIONS.
WHEN GRADE BREAK DISTANCE EXCEEDS 5 FEET, USE RADIAL DETECTABLE WARNING FIELD PER SDD 8D5-f.
PROVIDE GRADE BREAK PERPENDICULAR TO DIRECTION OF WHEELCHAIR TRAVEL.
WHEN DISTANCE IS LESS THAN 6' - 0", IT MAY BE DIFFICULT TO ACHIEVE A 7% DESIGN MAXIMUM SLOPE OR FLATTER
ALONG THE RAMP. REDUCE CURB HEIGHT IN TRIANGLE AREA TO ACHIEVE 7% DESIGN MAXIMUM SLOPE OR FLATTER
ON RAMP. CONSTRUCT 2-INCH MINIMUM CURB HEIGHT BETWEEN 10:1 FLARES.
**
WIDTH SHOWN ELSEWHERE IN THE PLANS
2
3
4
PLACE DETECTABLE WARNING
FIELD AT BACK OF CURB
±0.5% CONSTRUCTION TOLERANCE IN SIDEWALK CROSS SLOPE. THE SIDEWALK CROSS SLOPE SHALL NOT EXCEED
2.1% WITHOUT PRIOR APPROVAL FROM THE ENGINEER.
A MAXIMUM 2-INCH CONCRETE BORDER IS PERMITTED ALONG ALL SIDES OF THE DETECTABLE WARNING FIELD SURFACE.
WHERE A LANDING SERVES TWO CURB RAMPS, THE LANDING SLOPE SHALL NOT EXCEED THE CROSS SLOPE AT THE
BOTTOM OF THE RAMP OR WITHIN THE CROSSWALK PARALLEL TO THE DIRECTION OF TRAVEL.
EXPANSION JOINT
1.5%
SLOPE
1.5%
SLOPE
SLOPE 'A'
CONCRETE SIDEWALK
CONCRETE SIDEWALK
PROVIDE A LANDING WITH A SLOPE PARALLEL TO ROADWAY THAT MATCHES SLOPE AT THE BOTTOM OF THE
ADJACENT RAMP. SLOPE PERPENDICULAR TO ROADWAY SHALL BE 2.1% MAXIMUM. STANDARD LANDING SIZE IS 5 FEET
BY 5 FEET.
SLOPE 'B'
SLOPE 'A'
SLOPE 'A'
SLOPE 'B'
SLOPE 'B'
THE ENTIRE RAMP SHALL BE A PLANAR SURFACE. DO NOT WARP THE RUNNING SLOPE OR CROSS SLOPE OF THE
RAMP. WARPING OF THE SIDEWALK CROSS SLOPE SHALL TAKE PLACE BETWEEN THE LANDING AND MATCH POINT.
THE CLEAR AREA BETWEEN THE BOTTOM OF RAMP AND BACK OF CURB SHALL BE SLOPED SO THAT WATER DRAINS
OUT OF ONE SIDE OR BOTH SIDES OF THE CURB OPENING.
LANDING
CURB RAMP
CLEAR AREA
CURB RAMP
CURB RAMP
SLOPE 'B'
SLOPE 'B'
SLOPE 'B'
SLOPE 'A'
SLOPE 'A'
SLOPE 'A'
GRADE CHANGE BETWEEN GUTTER COUNTER SLOPE AND THE CURB RAMP SLOPE IS DESIRABLY 11% OR LESS
AND SHALL NOT EXCEED 13.3%. TYPICAL GUTTER COUNTER SLOPE IS 4% BUT MAY BE MODIFIED TO FIT FIELD
CONDITIONS. PROVIDE LONGITUDINAL DRAINAGE AROUND CURB AND AWAY FROM CURB RAMP. NO VERTICAL LIPS
OR DISCONTINUITIES ARE ALLOWED. SLOPE OF CURB HEAD OPENING SHALL MATCH THE RAMP SLOPE, MINIMALLY
1.5%, DESIRABLY 7% OR LESS, AND SHALL NOT EXCEED A MAXIMUM OF 8.3%. WHEN ADJACENT TO 1.5% LANDING,
CONSTRUCT CURB HEAD OPENING AT 1.5% IN THE DIRECTION OF PEDESTRIAN TRAVEL.
MAXIMUM 8.3% CURB RAMP SLOPE IS ALLOWABLE WITH GUTTER COUNTER SLOPE OF 5% MAXIMUM AND A 13.3%
MAXIMUM GRADE CHANGE.
23
23
23
22
22
22
22
22
21
21
21
21
17
19
19
19
6SDD
SDD
6
08D05-22b
08D05-22b
GENERAL NOTES
12" EXPANSION JOINT SIDEWALK
CONTRACTION JOINT SIDEWALK
PAVEMENT MARKING
CROSSWALK (WHITE)
LEGEND
7
8
10
CURB RAMP TYPE 4B
PLAN VIEW
CURB RAMP TYPE 4B1
PLAN VIEW
ISOMETRIC VIEW FOR TYPE 4B1
ISOMETRIC VIEW FOR TYPE 4B
SECTION C - C FOR TYPE 4B
SECTION A - A FOR TYPE 4B
SECTION B - B FOR
TYPE 4B AND TYPE 4B1
10
TOP OF
ROADWAY
DEPRESSED
CURB & GUTTER
28
1.5%
DETECTABLE WARNING
FIELD (SEE SDD 8D5-g) EXPANSION
JOINT
CLEAR
AREA
EXPANSION JOINT
CONCRETE
SIDEWALK 7% DES. MAX.
3
2' - 0"
6' - 0" MIN.
CURB RAMP
5' MAX. 7
3' CURB TAPER
WITH 6" CURB
5' - 0"
MIN.
6' - 0" MIN.
CURB RAMP
X
CLEAR
AREA
RADIUS (AT CURB FACE)
RADIUS (AT CURB FACE)
RADIUS POINT
OF CURB RETURN
RADIUS POINT
OF CURB RETURN
8
5' - 0"
MIN.
2
6' - 0" MIN.
RAMP
X
CLEAR
AREA
DETECTABLE WARNING
FIELD (SEE SDD 8D5-g)
EXPANSION
JOINT
4
A A
C C
5' MAX. 7
CONCRETE CURB
PEDESTRIAN 10
B
5' MAX.
7
5' MAX.
10
7
TOP OF
ROADWAY
CONCRETE
CURB & GUTTER
6"
CONCRETE
SIDEWALK
1.5% 4
5' - 0" W
TERRACE
VARIABLE
TOP OF
ROADWAY
CONCRETE
CURB & GUTTER
TERRACE STRIP
VARIES 0 TO W
1.5% 4
6"
5' - 0" CURB RAMP
VARIES
0" - 6"
VARIES
0" - 6"
B
Y
DISTANCE FROM PC
W
5' - 0"
SIDEWALK
1.5%
CROSS
SLOPE
10
10
4
W
5' - 0"
SIDEWALK
1.5%
CROSS
SLOPE
Y
DISTANCE
FROM PC
2
DETECTABLE WARNING
FIELD (SEE SDD 8D5-g)
8
INTERMEDIATE RADII CAN BE INTERPOLATED
DIMENSION "Y" IS CALCULATED BASED ON 6'-0" RAMP LENGTH
DIMENSION "X" IS CALCULATED BASED ON 5'-0" SIDEWALK WIDTH
3' CURB TAPER
WITH 6" CURB
BB
STATE OF WISCONSIN
DEPARTMENT OF TRANSPORTATION
CURB RAMPS
TYPE 4B AND 4B1
EXPANSION
JOINT
TERRACE STRIP
(PLANTING OR
NON-TRAVERSABLE
SURFACE SHOWN)
NON-TRAVERSABLE FLARE
NON-TRAVERSABLE FLARE
++
++
++
W = 3' - 0"RADIUS
(AT CURB FACE)
10 FEET
X
15 FEET
20 FEET
30 FEET
40 FEET
2' - 10 14"
Y
0' - 5"
4' - 6 3 4" 2' - 1 3 4"
W = 4' - 0"
X
2' - 1"
Y
1' - 4 12"
3' - 9" 3' - 5 3 4"
4' - 11 12" 5' - 1 3 4"
W = 5' - 0"
X
1' - 5"
Y
2' - 1"
3' - 1 14" 4' - 6"
4' - 3 14" 6' - 5 12"
W = 6' - 0"
X
0' - 10"
Y
2' - 7 12"
2' - 6 3 4" 5' - 4 12"
3' - 8 3 4" 7' - 7"
W = 7' - 0"
X
0' - 3 14"
Y
3' - 0 14"
2' - 1" 6' - 1"
3' - 3" 8' - 6 12"
W = 8' - 0"
X
2' - 10"
Y
9' - 4 12"
4' - 5 12" 13' - 7 3 4"
W = 9' - 0"
X Y
W = 10' - 0"
X Y
4' - 10 3 4" 12' - 5 3 4"
1' - 8" 6' - 8 12"
2' - 5 12" 10' - 1 14"
4' - 0 3 4" 14' - 8 12"
1' - 3 14" 7' - 2 12"
2' - 1 14" 10' - 9"
3' - 8 12" 15' - 8 14"
4' - 10 3 4" 19' - 8 14"
0' - 10 3 4" 7' - 7 14"
TERRACE STRIP
(PLANTING OR
NON-TRAVERSABLE
SURFACE SHOWN)
CONCRETE CURB
PEDESTRIAN (TYP)
AVOID PLACING DRAINAGE STRUCTURES, JUNCTION BOXES OR OTHER OBSTRUCTIONS IN FRONT OF CURB RAMP ACCESS AREAS.
DETAILS OF CONSTRUCTION, MATERIALS AND WORKMANSHIP NOT SHOWN ON THIS DRAWING SHALL CONFORM TO
THE PERTINENT REQUIREMENTS OF THE STANDARD SPECIFICATIONS AND THE APPLICABLE SPECIAL PROVISIONS.
DETECTABLE WARNING FIELDS THAT ARE INSTALLED AS A GROUP OR SIDE BY SIDE, SHALL BE FROM THE SAME MANUFACTURER.
WHEN THIS GRADE BREAK DISTANCE EXCEEDS 5 FEET, USE RADIAL DETECTABLE WARNING FIELD PER SDD 8D5-f.
PROVIDE GRADE BREAK PERPENDICULAR TO DIRECTION OF WHEELCHAIR TRAVEL.
INSTALL TRANSITION NOSE (INCIDENTAL TO OTHER PAY ITEMS). DO NOT MARK TRANSITION NOSE.
2
3
4
MAXIMUM 2.1% SLOPE IN ALL
DIRECTIONS IF FRONT OF GRADE
BREAK
*
CONSTRUCT 6" WEDGE TO AVOID
CONCRETE BREAKAGE
++
±0.5% CONSTRUCTION TOLERANCE IN SIDEWALK CROSS SLOPE. THE SIDEWALK CROSS SLOPE SHALL NOT EXCEED
2.1% WITHOUT PRIOR APPROVAL FROM THE ENGINEER.
A MAXIMUM 2-INCH CONCRETE BORDER IS PERMITTED ALONG ALL SIDES OF THE DETECTABLE WARNING FIELD SURFACE.
CONCRETE SIDEWALK
CONCRETE SIDEWALK
1.5%
MAXIMUM 1.5% DESIGN MAXIMUM AND 2.1% PROWAG MAXIMUM RUNNING SLOPE ON CLEAR AREA. CROSS SLOPE OF
CLEAR AREA SHALL MATCH THE CROSS SLOPE OF THE ADJACENT CROSSWALK.
THE ENTIRE RAMP SHALL BE A PLANAR SURFACE. DO NOT WARP THE RUNNING SLOPE OR CROSS SLOPE OF THE
RAMP. WARPING OF THE SIDEWALK CROSS SLOPE SHALL TAKE PLACE BETWEEN THE LANDING AND MATCH POINT.
THE CLEAR AREA BETWEEN THE BOTTOM OF RAMP AND BACK OF CURB SHALL BE SLOPED SO THAT WATER DRAINS
OUT OF ONE SIDE OR BOTH SIDES OF THE CURB OPENING.
GRADE CHANGE BETWEEN GUTTER COUNTER SLOPE AND THE CURB RAMP SLOPE IS DESIRABLY 11% OR LESS
AND SHALL NOT EXCEED 13.3%. TYPICAL GUTTER COUNTER SLOPE IS 4% BUT MAY BE MODIFIED TO FIT FIELD
CONDITIONS. PROVIDE LONGITUDINAL DRAINAGE AROUND CURB AND AWAY FROM CURB RAMP. NO VERTICAL LIPS
OR DISCONTINUITIES ARE ALLOWED. SLOPE OF CURB HEAD OPENING SHALL MATCH THE RAMP SLOPE, MINIMALLY
1.5%, DESIRABLY 7% OR LESS, AND SHALL NOT EXCEED A MAXIMUM OF 8.3%. WHEN ADJACENT TO 1.5% LANDING,
CONSTRUCT CURB HEAD OPENING AT 1.5% IN THE DIRECTION OF PEDESTRIAN TRAVEL.
MAXIMUM 8.3% CURB RAMP SLOPE IS ALLOWABLE WITH GUTTER COUNTER SLOPE OF 5% MAXIMUM AND A 13.3%
MAXIMUM GRADE CHANGE.
23
23
23
22
22
22
17
20
20
20
6SDD
SDD
6
08D05-22d
08D05-22d
GENERAL NOTES
2
10
TOP OF
ROADWAY
DEPRESSED CURB & GUTTER
2
DETECTABLE WARNING
FIELD (SEE SDD 8D5-g)
CONCRETE
SIDEWALK
CONCRETE CURB
PEDESTRIAN
11
12
STREET
STREET
RIGHT TURN LANE
12" EXPANSION JOINT SIDEWALK
CONTRACTION JOINT FIELD LOCATED
PAVEMENT MARKING CROSSWALK (WHITE)
LEGEND
CURB RAMP TYPE 6
DETECTABLE WARNING AT ISLANDS CURB RAMP TYPE 7B
SECTION A - A FOR TYPE 5
SECTION B - B FOR TYPE 7A
CURB RAMP TYPE 7A
CURB RAMP TYPE 5
MEDIAN ISLAND
NON-ELEVATED PEDESTRIAN CROSSING
CURB RAMP TYPE 8
1.5% 4
6"
6" 2' - 0"
5' - 0" MIN.MEDIAN ISLAND
7% DES. MAX.
7% DES. MAX.11
11
7% DES. MAX.
7% DES. MAX.
11
11
EXPANSION
JOINT
EXPANSION
JOINT
EXPANSION
JOINT
LANDING
LANDING
CONCRETE CURB
PEDESTRIAN
1.5%
1.5%
6
6
5' - 0" MIN.
5' - 0"
MIN.
EXPANSION
JOINT
*
MAXIMUM 8.3%
*
*
*
*
A
B
B
VARIES
1010
10
13
5' - 0" MIN.
DETECTABLE WARNING
FIELD (SEE SDD 8D5-g)
DETECTABLE WARNING
FIELD (SEE SDD 8D5-g)
DETECTABLE WARNING
FIELD (SEE SDD 8D5-g)
1% MINIMUM (PROVIDE DRAINAGE)
**
** **
DETECTABLE WARNING
FIELD (SEE SDD 8D5-g)
A
EDGE OF ROADWAY
EDGE OF ROADWAY
DETAILS TO BE DETERMINED BY ENGINEER
***
***
***
5' - 0"MIN.
5' - 0"MIN.
5' -0"
MIN.
5' - 0"
MIN.
6
5' X 5'
LANDING
REQUIRED
REFER TO GENERAL NOTES AND
FOR ALL ISLAND CURB RAMPS
2 3
10
10
10
10
10
10
6' - 0" MIN.
LANDING
6' - 0"
MIN.
6' - 0"
MIN.
5' - 0"
5' - 0"
STATE OF WISCONSIN
DEPARTMENT OF TRANSPORTATION
CURB RAMPS
TYPE 5, 6, 7A, 7B & 8
13
FOR INTERSECTIONS AND
MID BLOCK CROSSINGS
DETECTABLE WARNINGS
FOR SIDEWALKS OR SHARED USE PATHS
AT RAILROAD CROSSINGS
VARIABLE
10 2'-0"
TYP
GATE ARM
(WHEN USED FOR
SIDEWALK/PATH
RAILROAD
CLOSURE)
2' - 0" TYP
REALIGNED
SIDEWALK/PATH
ALTERNATIVE
SIDEWALK/PATH
DETECTABLE WARNING
FIELD TYPICAL FLUSH
WITH SIDEWALK/PATH
WIDENED SIDEWALK/PATH
ALTERNATIVE (TYP)
REALIGN OR WIDEN
SIDEWALK/PATH FOR
PERPENDICULAR
RAILROAD CROSSING
12
12
2'-0"
MINHMA
HMA
HMA
FOR INTERSECTIONS AND
MID BLOCK CROSSINGS
PLANTING OR OTHER
NON-TRAVERSABLE SURFACE
PLANTING OR OTHER
NON-TRAVERSABLE SURFACE
2' -0"
(TYP)
2' - 0"
(TYP)
1% MIN
7% DES. MAX
AVOID PLACING DRAINAGE STRUCTURES, JUNCTION BOXES OR OTHER OBSTRUCTIONS IN FRONT OF CURB RAMP ACCESS AREAS.
DETAILS OF CONSTRUCTION, MATERIALS AND WORKMANSHIP NOT SHOWN ON THIS DRAWING SHALL CONFORM TO
THE PERTINENT REQUIREMENTS OF THE STANDARD SPECIFICATIONS AND THE APPLICABLE SPECIAL PROVISIONS.
SIDEWALK CROSS SLOPE SHALL NOT EXCEED 2.1%.
DETECTABLE WARNING FIELDS THAT ARE INSTALLED AS A GROUP OR SIDE BY SIDE, SHALL BE FROM THE SAME MANUFACTURER.
INSTALL TRANSITION NOSE (INCIDENTAL TO OTHER PAY ITEMS). DO NOT MARK TRANSITION NOSE.
SLOPE SIDEWALK TOWARD LANDING AS SHOWN WHERE THERE IS NO TERRACE OR WHERE THE TERRACE WIDTH IS LESS THAN
6 FEET WIDE.
THE EDGE OF THE DETECTABLE WARNING FIELD NEAREST TO A RAILROAD CROSSING SHALL BE 1.5 FEET ±0.1' FROM THE FACE OF
THE GATE ARM IF THE GATE ARM EXTENDS ACROSS THE SIDEWALK/PATH. WHERE THERE IS NO PEDESTRIAN GATE, THE EDGE OF
THE DETECTABLE WARNING FIELD NEAREST TO THE RAILROAD TRACK IS 15 FEET MAXIMUM AND 12 FEET MINIMUM, 15 FEET TYPICAL
FROM THE NEAREST RAIL.
DO NOT INSTALL DETECTABLE WARNING FIELDS AT THE EDGES OF STEET-LEVEL PEDESTRIAN REFUGE ISLANDS IF A MINIMUM 2
FOOT CONCRETE SURFACE WITHOUT DETECTABLE WARNINGS (MEASURED IN THE DIRECTION OF PEDESTRIAN TRAVEL) CANNOT
BE ACHIEVED.
****
FOR SHARED USE PATHS, WIDTH MUST BE AS
WIDE AS THE CROSSWALK****
3
4
6
±0.5% CONSTRUCTION TOLERANCE IN SIDEWALK CROSS SLOPE. THE SIDEWALK CROSS SLOPE SHALL NOT EXCEED
2.1% WITHOUT PRIOR APPROVAL FROM THE ENGINEER.
PROVIDE A 5 FOOT BY 5 FOOT LANDING. SLOPE PERPENDICULAR TO CURB SHALL BE 2.1% MAXIMUM. SLOPE
PARALLEL TO CURB SHALL MATCH THE CURB AND GUTTER LONGITUDINAL SLOPE.
WHEN THE DISTANCE BETWEEN THE BACK OF CURBS IS LESS THAN 6 FEET BUT THE FACE OF CURB TO FACE OF CURB DISTANCE IS
6 FEET OR GREATER THEN THE DETECTABLE WARNING FIELDS MAY BE MOVED SO THAT THE EDGE OF THE WARNING FIELD IS
PLACED AT THE GUTTER FLOWLINE. MAINTAIN A MINIMUM OF TWO FEET BETWEEN DETECTABLE WARNING FIELD PANELS.
A MAXIMUM 2-INCH CONCRETE BORDER IS PERMITTED ALONG ALL SIDES OF THE DETECTABLE WARNING FIELD SURFACE.
THE ENTIRE RAMP SHALL BE A PLANAR SURFACE. DO NOT WARP THE RUNNING SLOPE OR CROSS SLOPE OF THE
RAMP. WARPING OF THE SIDEWALK CROSS SLOPE SHALL TAKE PLACE BETWEEN THE LANDING AND MATCH POINT.
GRADE CHANGE BETWEEN GUTTER COUNTER SLOPE AND THE CURB RAMP SLOPE IS DESIRABLY 11% OR LESS
AND SHALL NOT EXCEED 13.3%. TYPICAL GUTTER COUNTER SLOPE IS 4% BUT MAY BE MODIFIED TO FIT FIELD
CONDITIONS. PROVIDE LONGITUDINAL DRAINAGE AROUND CURB AND AWAY FROM CURB RAMP. NO VERTICAL LIPS
OR DISCONTINUITIES ARE ALLOWED. SLOPE OF CURB HEAD OPENING SHALL MATCH THE RAMP SLOPE, MINIMALLY
1.5%, DESIRABLY 7% OR LESS, AND SHALL NOT EXCEED A MAXIMUM OF 8.3%. WHEN ADJACENT TO 1.5% LANDING,
CONSTRUCT CURB HEAD OPENING AT 1.5% IN THE DIRECTION OF PEDESTRIAN TRAVEL.
MAXIMUM 8.3% CURB RAMP SLOPE IS ALLOWABLE WITH GUTTER COUNTER SLOPE OF 5% MAXIMUM AND A 13.3%
MAXIMUM GRADE CHANGE.
22
22
22
22
22
22
22
22
18
18
17
6SDD
SDD
6
08D05-22e
08D05-22e
CONCRETE BASESTYPE 2
GENERAL NOTES
CONCRETE BASE TYPE120.570.4023166018
APPROX. CUBICYARDS OF CONCRETELBS. OF HOOPBAR STEELLBS. OF VERTICALBAR STEEL
0.40
FORMING DETAILNONENONE
TYPE 5 & 6
5 & 6
TYPE 1
DETAILS OF CONSTRUCTION, MATERIALS AND WORKMANSHIP NOT SHOWN ON THISDRAWINGSHALL CONFORM TO THE PERTINENT REQUIREMENTS OF THE CONTRACT.BASES SHALL BE EXCAVATED BY USE OF A CIRCULAR AUGER.TOP SURFACES OF CONCRETE BASES SHALL BE TROWEL FINISHED SMOOTH AND LEVEL.CONDUIT SIZES AND LOCATIONS SHALL BE SHOWN ON THE PLANSTHE FINAL OR TERMINATING CONCRETE BASE IN A CONDUIT RUN SHALL HAVE A 6" EXITSTUB INSTALLED FOR FUTURE CABLING USE. THE EXIT STUB SHALL BE SIZED AS USEDTHROUGHOUT THE CONDUIT RUN AS SHOWN A THE ENTRANCE OF THE BASE.ENDS OF CONDUIT INSTALLED BELOW GRADE FRO FUTURE USE SHALL BE CAPPED IFMETALLIC OR PLUGGED IF NON-METALLIC.MINIMUM BENDING RADIUS OF CONDUIT IS EQUAL TO 6X THE DIAMETER.CONDUIT HEIGHT ABOVE CONCRETE BASES SHALL BE 1 INCH. ALL METALLIC CONDUITENDS SHALL BE REAMED AND THREADED.ALL CONDUIT ENDS AT THE TOP OF CONCRETE BASES SHALL BE CAPPED IF METALLICOR PLUGGED IF NON-METALLIC IMMEDIATELY AFTER PLACEMENT AND BEFORE CONCRETEIS POURED. CONDUITS IN WHICH WIRE OR CABLE IS NOT INSTALLED SHALL REMAIN CAPPEDOR PLUGGED.
BELL ENDS SHALL BE INSTALLED ON ALL PVC CONDUIT EXPOSED AT THE TOP OFCONCRETE BASES BEFORE INSTALLATION.WHEN REQUIRED TO CONNECT NON-METALLIC CONDUIT TO METALLIC CONDUIT,ONLY ADAPTER FITTINGS, U.L. LISTED FOR ELECTRICAL USE, SHALL BE USED.IF A BASE REQUIRES A DEEP FORM BECAUSE OF LOOSE DIRT OR FILL, THE FORMSHALL BE REMOVED BEFORE BACKFILLING AROUND THE BASE. BACKFILL SHALL BETAMPED TIGHT AGAINST THE BARE CONCRETE BASE IN LAYERS OF 1 FOOT OR LESS.A NO. 4 AWG STRANDED COPPER EQUIPMENT GROUNDING CONDUCTOR SHALL BEEXOTHERMICALLY WELDED TO THE EQUIPMENT GROUNDING ELECTRODE (GROUNDROD) FOR TYPE 2, TYPE 5 AND TYPE 6 BASES.THE EQUIPMENT GROUNDING CONDUCTOR SHALL BE FURNISHED AND INSTALLEDTO ENTER ALL BASE TYPES THROUGH A 1 INCH CONDUIT INSTALLED FOR GROUNDINGPURPOSES, LEAVING A 4 FOOT COIL OF WIRE ABOVE THE CONCRETE BASE. THEEQUIPMENT GROUNDING CONDUCTOR SHALL BE NEATLY COILED AND THE COILSTIED TOGETHER.ANCHOR RODS SHALL BE THREADED 12" IN LENGTH ON EACH END OF THE ROD.ANCHOR RODS SHALL BE MANUFACTURED IN ACCORDANCE WITH SECTION 654.2.1OF THE STANDARD SPECIFICATIONS.WASHERS AND LOCK WASHERS ARE REQUIRED ON ALL ANCHOR RODS.WHEN ANCHOR RODS USING THE ALTERNATE "L" BEND ARE FURNISHED, THE4 INCH"L" BEND SHALL BE IN ADDITION TO THE SPECIFIED ANCHOR ROD BARLENGTH. THE "L" BEND SHALL NOT BE THREADED.ANCHOR RODS SHALL BE INSTALLED WITH MISALIGNMENTS OF LESS THAN 1:40FROM VERTICAL.WELDING OF THE ANCHOR RODS TO THE CAGE IS UNACCEPTABLE. TIE WIRESSHALL BE USED.BAR STEEL REINFORCEMENT SHALL BE COATED WITH POWDERED EPOXY RESIN INACCORDANCE WITH SECTION 505 OF THE STANDARD SPECIFICATIONS(LATEST EDITION).THE MINIMUM DEPTH OF CONDUIT EXITING THE CONCRETE BASE AND INSTALLEDBELOW THE TRAVELED WAY SHALL BE 24 INCHES. THE MINIMUM DEPTH OF CONDUITEXITING THE CONCRETE BASE THAT IS NOT INSTALLED BELOW THE TRAVELED WAYSHALL BE 18 INCHES. THE MAXIMUM DEPTH OF ALL CONDUIT SHALL BE 36 INCHESEXCEPT WITH WRITTEN APPROVAL OF THE ENGINEER.(4) 1" DIA. X 3' - 6" ANCHOR RODS.(4) 1" DIA. X 5' - 0" ANCHOR RODS.(6) NO. 6 X 6' - 8" BAR STEEL REINFORCEMENT.(7) NO. 4 X 5' - 1" BAR STEEL REINFORCEMENT @ 1' - 0" C - C.(4) 1" DIA. X 3' - 6" ANCHOR RODS.(6) NO. 4 X 4' - 8" BAR STEEL REINFORCEMENT.(5) NO. 4 X 5' - 1" BAR STELL REINFORCEMENT @ 1' - 0" C -C.EXOTHERMIC CONNECTION TO EUIPMENT GROUNDING CONDUCTOR58" DIA. X 8' -0" COPPERCLAD EQUIPMENT GROUNDING ELECTRODE REQUIREDANY ANCHOR ROD PROJECTION SHORTER THAN 2 34" OR LONGER THAN 3 14" SHALLREQUIRE THE BASE TO BE REMOVED AND REPLACED AT THE CONTRACTORS EXPENSE.FOR NON - BREAKAWAY INSTALLATIONS, 4 12" ± ANCHOR ROD PROJECTION WITH THEUSE OF LEVELING NUTS. RODENT SCREEN REQUIRED.
QUANTITYREQUIREMENTS
1
2345678
FORM DEPTH SHALL BENO MORE THAN 6" BELOWGRADE ON THE LOWERSIDE OF BASE
FORMING SHALL BEREMOVED AFTERCONCRETE HAS SETFORM6" MAX.4" MAXFORM
1' - 8" 1' - 8" 1' - 8"CONDUITCONDUITCONDUIT1" CONDUITFOR GROUNDINGPURPOSES1" CONDUITFOR GROUNDINGPURPOSES11 12" BOLT CIRCLE11 12" BOLT CIRCLE12 34" BOLT CIRCLECONDUIT WITHIN6" DIA. CONDUIT WITHIN6" DIA. CONDUIT WITHIN6" DIA.ANCHOR RODS SHALL BEORIENTED PARALLEL TOTHE ROADWAYANCHOR RODS SHALL BEORIENTED PARALLEL TOTHE ROADWAYANCHOR RODS SHALL BEORIENTED PARALLEL TOTHE ROADWAY2 34 5 867
CONDUIT
1' - 2"(OUT TO OUT)1' - 2"(OUT TO OUT)
3"FORM ALL EXPOSEDCONCRETE. PROVIDE1" CHAMFER ALL AROUND3"FORM ALL EXPOSEDCONCRETE. PROVIDE1" CHAMFER ALL AROUND3"
FORM ALL EXPOSEDCONCRETE. PROVIDE1" CHAMFER ALL AROUND
74
3" CLEAR3" CLEAR 6" STUB16" STUB1
6" STUB1 OPTIONAL 4" L BENDOR HEX NUT (TYPICALFOR TYPES 1, 2, 5 & 6OPTIONAL 4" L BENDOR HEX NUT (TYPICALFOR TYPES 1, 2, 5 & 6OPTIONAL 4" L BENDOR HEX NUT (TYPICALFOR TYPES 1, 2, 5 & 6
2"2"
9
1' - 0"1'-0"9
6" MIN.
6" MIN.
8 101112
1112111211
1010 5' - 0"
1' - 0"
9
6" MIN.
6" MIN.
5107' - 0"
632
5' - 0"MIN.
1'-0"34" PREFORMED FILLERAS APPROVED BY THEENGINEER
1"TOPSOIL ANDSEED ORCRUSHEDAGGREGATE
2" HALF SECTIONIN PAVEMENT(TYPICAL FORTYPES 1, 2, 5 & 6)HALF SECTION INUNPAVED AREA(TYPICAL FORTYPES 1, 2, 5 & 6)
2"2"
1' - 5"MIN. LAP 1' - 5"MIN. LAP6 6
SDD
SDD
09C02 - 09
09C02 - 09
SDD 9C2 Concrete Bases, Types 1, 2, 5 & 6
STATE OF WISCONSINDEPARTMENT OF TRANSPORTATIONAPPROVEDDATESTATE ELECTRICAL ENGINEER/S/FHWA
CONCRETE BASESTYPES 1, 2, 5, & 6
May 2019Ahmet Demirbilek
TOP
BOTTOM
1'-1" NOMINAL
1' -1" NOMINAL
BOLT CIRCLE 12"
1
"
11" NOMINAL
1 1" NOMINAL
3" NOMINAL
NOMINAL 8" X 8"
ACCESS OPENING
1 5" NOMINAL
6" NOMINAL
4" O.D. PIPE
(TRAFFIC SIGNAL STANDARD)
STEEL BOLT
HEX HEAD STAINLESS
1"
1"
STEEL BOLT
STAINLESS
HEX HEAD
AS NEEDED
" OR " THICK
ON 10" THROUGH 12" BOLT CIRCLE
SLOTTED FOR 1" DIA. BOLTS
1'-1" NOMINAL
1' -5" NOMINAL
1' -
0
" N
O
M
IN A
L
1'-1" N O
M
IN A
L
6
" M
IN
.
HOLE DRILLED AND TAPPED
FOR GROUNDING PURPOSES
HOLE DRILLED AND TAPPED
FOR GROUNDING PURPOSES
6
" M
IN
.
3" MIN.
THE USE OF WASHERS IN LIEU OF PROPER LEVELING SHIMS IS NOT ACCEPTABLE.
UNDER CAST BASES WHEN PLUMBING POLES OR STANDARDS DURING INSTALLATION.
LEVELING SHIMS, IF NEEDED, SHALL BE DESIGNED FOR THE PURPOSE AND USED
" X " - 20 (TPI)
" X " - 20 (TPI)
6"
LENGTH VARI IES
SHIM LENGTH SHALL BE LONG ENOUGH TO COMPLETELY COVER THE AREA UNDER
THE LENGTH AND WIDTH OF THE BASE MOUNTING FLANGE.
HEX NUT
HEX HEAD
FOR A " - 20 (TPI) BOLT
FOR A " - 20 (TPI) BOLT
DOUBLE NUTTING IS NOT ACCEPTABLE FOR LEVELING OR MOUNTING PURPOSES.
THE MECHANICAL CONNECTOR SHALL BE INSTALLED USING A " - 20 (TPI) STAINLESS
SHALL NOT BLOCK ACCESSIBILITY TO WIRE PLACEMENT IN THE CONNECTOR.
THEY SHALL BE STAINLESS STEEL AS IS THE BOLT. THE MANNER OF ATTACHMENT
STEEL HEX HEAD BOLT OF SUFFICIENT LENGTH TO FIRMLY ATTACH THE LUG TO THE BASE.
SHOULD THE MANNER OF ATTACHMENT OF THE LUG REQUIRE WASHERS, HEX NUTS, LOCK WASHER -
R= "
1"
1" TOE THICKNESS
INTENDED FOR USE WITH TYPE 2, 3, 4, 5 & 6 POLES
PEDESTAL BASE COLLAR THREADING SHALL BE TAPERED AND IN ACCORDANCE WITH NATIONAL
PIPE THREADING DIMENSIONS.
THE ACCESS DOOR SHALL BE OF THE SAME MATERIAL AS THE BASE.
10" THROUGH 12" BOLT CIRCLE
SLOTTED FOR 1" DIA. BOLTS
(SEE DETAIL)
(SEE DETAIL)
BASE COLLAR THREADING SHALL EXTEND INTO THE BASE COLLAR WITH SUFFICIENT DEPTH TO
ACCEPT THE INSTALLATION OF TRAFFIC SIGNAL STANDARDS TO A DEPTH OF 1", THEN TIGHTENING
TO A POINT OF BEING IMMOVABLE.
TO BE FURNISHED WITH EACH BASE
PEDESTAL BASE
LEVELING SHIM
TRANSFORMER BASE
TYPICAL MECHANICAL
CONNECTOR LUG
GENERAL NOTES
ISOMETRIC VIEW
ISOMETRIC VIEW
TOP VIEW
(PEDESTAL BASE)
BOTTOM VIEW
(PEDESTAL BASE)
BOTTOM VIEW
(TRANSFORMER BASE)
BASE WASHER
PEDESTAL
"
TO BE PROVIDED BY THE CONTRACTOR
ZINC COATED STEEL WASHER
2"
1 "
1
1
DEPARTMENT OF TRANSPORTATION
STATE OF WISCONSIN
APPROVED
DATE
FHWA
6 6
TRANSFORMER/PEDESTAL BASES
S.D.D. 9 C 3-4
S.D .D . 9 C 3-4
STATE ELECTRICAL ENGINEER
11" X 9" X 9"
ACCESS OPENING NOMINAL
INSTALLED IN THE PEDESTAL AND TRANSFORMER BASES.
ACCEPT AWG. #10 TO $4 COPPER STRANDED WIRE SHALL BE FURNISHED AND
SET SCREW, DIRECT BURY RATED, MECHANICAL CONNECTOR (LUG), SIZED TO
A NEMA APPROVED, U.L. LISTED, COPPER WITH BRASS OR STAINLESS STEEL
0F THE STANDARD SPECIFICATIONS.
NUTS AND WASHERS SHALL BE MANUFACTURED IN ACCORDANCE WITH SECTION 641.2.2
BE 1" DIAMETER, 4" IN LENGTH, WITH WASHERS, LOCK WASHERS AND NUTS. BOLTS,
FOUR (4) BOLTS SHALL BE FURNISHED WITH EACH TRANSFORMER BASE. BOLTS SHALL
DRAWING SHALL CONFORM TO THE PERTINENT REQUIREMENTS OF THE CONTRACT.
DETAILS OF CONSTRUCTION, MATERIALS AND WORKMANSHIP NOT SHOWN ON THIS
Sept. 2014/S/ Ahmet Demirbilek
SDD 9C3 Transformer/Pedestal Bases
531.2.2
HORIZONTAL SIGNAL HEADMOUNTING DETAILTYPICAL MOUNTING OF 3 SECTIONSIGNAL FACETYPICAL MOUNTING OF BACK TO BACK3 AND 5 SECTION SIGNAL FACES
1234567891011
CONDUIT NIPPLE
SERRATEDLOCK WASHER11SIGNAL HEADMOUNTING LUGNUT
SIGNAL HEAD ATTACHMENT ALSOAPPLIES TO MOUNTING AT CROSS BAR
PINNACLE CAP
MOUNTINGBRACKET
RUBBERWASHER
CONDUIT NIPPLESIGNALBODYSIGNAL FACEMOUNTINGLOCK NUT
210' MOUNTING HEIGHT16103' - 6"
1' - 6"
2
POLE SPLICE WHENSTEEL POLE IS TOBE FURNISHED
3
4 2' - 6"
ROUND SHAFT8" O.D. (POLE BUTT) X 6 58" O.D.LOWER 15' TAPEREDPEDESTRIAN PUSH BUTTONWHEN REQUIRED
52
SIDEWALK, ORIF NONE, PAVEMENTCENTERLINE GRADEROADWAYPAVEMENTMOUNTING HEIGHT17' - 0 " MIN.19' - 0" MAX.
4 8
WELDED
WELDED
ADJUSTABLE TO 6' -6" MIN.
7CURVEDEND
7
1' - 4"MIN.
SEE HORIZONTALSIGNAL HEADMOUNTING DETAIL
WELD TO BE 100% R.T. OR U.T. TESTED AS PERTHE REQUIREMENTS OF AWS D 1.5-88. RECORDSOF COMPLIANCE OF SUCH TESTING SHALL BEFURNISHED TO THE OFFICE OF DESIGN / BRIDGEFOR VERIFICATION AND APPROVAL.
FOR MANUFACTURERS USE ONLY
BACK - UPBAR
22
NIPPLEMOUNTINGAXISSIGNAL FACEHOUSING
TROMBONEARMHORIZONTAL TUBES10°
10°90°
(10 DEGREES TILT REQUIREMENT OFFACE(S) IN THE TROMBONE MOUNTING)
9VENTILATEDMETALLICCAP AND BOLT
NOMINAL 20' - 0" POLE LENGTH
5' - 0" @6.625 ± .030" O.D.
VARIABLE25' - 0" LENGTH FOR DESIGN CALCULATION
MOUNTING HEIGHT LIMITATION DIMENSIONSOF THE TROMBONE MAST ARM WILL BEDEPENDENT UPON THE USE / NON - USE OF ATRANSFORMER BASE
7
7
DETAILS OF CONSTRUCTION, MATERIALS AND WORKMANSHIP NOT SHOWN ON THIS DRAWING SHALLCONFORM TO THEPERTINENT REQUIREMENTS OF THE CONTRACT.POLES SHALL BE EITHER ALUMINUM OR GALVANIZED STEEL AS CALLED FOR IN THE CONTRACT.SECTION 657, POLES, OF THE STANDARD SPECIFICATIONS SHALL APPLY TO THIS DRAWING.A PULL WIRE / ROPE SHALL BE INSTALLED IN EACH TROMBONE ARM RACEWAY DURING THEMANUFACTURING PROCESS.TYPE 2 ALUMINUM POLES SHALL BE CONSTRUCTED OF 6063 - T6 ALUMINUM ALLOY. SLEEVING INSIDE THEPOLE IS NOT ACCEPTABLE.WHEN TRANSFORMER BASES ARE USED, WIRE CONNECTIONS SHALL BE MADE IN THE TRANSFORMERBASE.4" X 6" REINFORCED HANDHOLE AND COVER ASSEMBLY WITH TWO (2) 14"X34" - 20 TPI , STAINLESS STEEL,HEX HEAD BOLTS.SIGNAL FACE MOUNTING BRACKETS. MOUNT WITH CAP SCREWS AND BANDING.GROMMETS. 1" CHASE NIPPLES OR 1" CLOSE CONDUIT NIPPLES WITH BUSHINGS SHALL BE PROVIDEDFOR 1 38" HOLE IN POLE SHAFT FOR WIRING.SECURELY MOUNT DULL BLACK POLYCARBONATE BACK PLATES, PROJECTING 5" BEYOND ALL SIDES OFTHE SIGNAL FACE HOUSING,PER MANUFACTURER'S RECOMMENDATIONS.POLE MOUNTED SIGNAL FACES SHALL REQUIRE ONE OR MORE MOUNTING SPACERS UNDER THE TOPMOUNTING BRACKET(S) AS REQUIRED, TO PLUMB THE SIGNAL FACES.CAST ALUMINUM TRANSFORMER BASE.USE 1 12" ID NIPPLES ZINC-COATED RIGID METAL CONDUIT, LONG ENOUGH TO ACCOMMODATE FULLDEPTH THREADING INTO THE HEAD MOUNTING LOCK NUT IN ORDER TO TIGHTEN THE FACE, BUT THAT DONOT INTERFERE WITH REFLECTOR CLOSURE. THREAD THE NIPPLE INTO THE MOUNTINGBRACKET/ELBOW UNTIL TIGHT. USE APPROVED PINNACLE TYPE HARDWARE FROM A DEPARTMENTAPPROVED MANUFACTURER TO CLOSE THE UNUSED 1 12" OPENING IN SIGNAL FACES AND BRACKETENDS.VERTICAL STRUT (ADJUSTABLE). ONE (1) SET SCREW ( 14"X34" - 20 TPI STAINLESS STEEL, HEX HEAD) INTOEACH ARM MEMBER IF STRUTS THE SLIDING TYPE.FURNISH AND INSTALL VENTILATED, CAST METALLIC (ALUMINUM ALLOY) CAPS. FASTEN CAPS WITH ONE(1) - 20 TPI STAINLESS STEEL, HEX HEAD BOLT.SHIMMING, IF NEEDED, SHALL BE LOCATED BETWEEN THE CONCRETE FOUNDATION AND THETRANSFORMER BASE.USE SERRATED LOCK WASHERS WITH NOTCHES BETWEEN END TEE AND SIGNAL HEAD.
STATE OF WISCONSINDEPARTMENT OF TRANSPORTATION
POLE MOUNTINGS FORTRAFFIC SIGNALSTYPE 2
SIGNAL HEAD SHALL BEMOUNTED WITH WINGNUTCLOSURE ON TOP
GENERAL NOTES
100%RT OR UT
POLE SPLICE DETAILSIGNAL FACE MOUNTING DETAIL(BANDED)
SECTION A-AAA**
**
(MAXIMUM LOAD)TYPE 2 POLE MOUNTING CONFIGURATION
** **
10' MOUNTING HEIGHT
210' MOUNTING HEIGHT
REDRED
22
2
2
6SDD
SDD
6
09E01-17a
09E01-17a
Source: City of Eagle River website. First collected Oct 10, 2026.