6-4-26 Planning Commission FULL PACKET
City of Eagle River · Vilas County · meeting of Jun 4, 2026 · Agenda packets
Open the original document More from City of Eagle River
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Please note that, upon reasonable notice, at least 24 hours in advance, efforts will be made to accommodate the needs of
disabled individuals through appropriate aids and services or provide a video link for meetings. For additional information to
request this service, please contact the City Clerk's Office at 715-479-8682 ext. 224,
525 E. Maple Street, P.O. Box 1269, Eagle River WI 54521.
AGENDA NOTICE (5/29/2026)
THE PLANNING COMMISSION OF THE CITY OF EAGLE RIVER WILL HOLD A MEETING ON
THURSDAY, JUNE 4, 2026, AT 5:00 P.M. AT CITY HALL, 525 E. MAPLE STREET IN EAGLE RIVER.
Notice is hereby given that a majority of the City Council of the City of Eagle River may be attending scheduled
Planning Commission meetings either in person or via zoom. This constitutes a meeting of the City Council
pursuant to State ex rel. Badke v. Greendale Village Bd., 173 Wis. 2d 553, 494 N.W.2d 409 (1993), and must be
noticed as such, although the Council will not take any formal action at these meetings.
This meeting will be available by Zoom at the following link:
https://us06web.zoom.us/j/85111695208?pwd=x5pMv8crrbsPuYwefObTYbJG0m83b3.1
Meeting ID: 851 1169 5208
Passcode: 963936
1) Call to Order.
2) Roll Call.
3) Approval of minutes.
4) Public Hearings, discussion and possible action on the following agenda item(s):
a) Conditional Use Permit Public Hearing Continuation: Request by Amerco Real Estate Company/U-
Haul for a conditional use permit to construct two (2) self-storage units totaling 51,977 square feet
at 1100 N. Railroad Street, Eagle River, computer number 221-1019-06, in accordance with Chapter
106, Article VI, Division 7, Sec 106-473 Uses permitted by conditional grant, (8) Storage buildings not
used for habitation – human or animal.
b) Final Plan Review – Bike/Pedestrian crossing at Bridge & Spruce Streets (GHT & ERRP)
c) Meadows - Request to purchase City-Owned Parcel Adjacent to 655 N Bond
d) Comprehensive Plan - Scheduling of future comprehensive plan sessions as stand-alone meetings
e) Discussion Only - Sponsor/off-site signage displayed year-round at local facilities (ie: Snowmobile
Derby Track, Vilas County Fairgrounds)
5) Adjournment.
Robin Ginner, City Administrator
Page 1
Page 2
May 7, 2026
A meeting of the Plan Commission of the City of Eagle River was called to order at 5:00pm by Mayor Deb
Brown.
Roll Call: Alex Forer, Mary Horant, Brad Adamovich, Adam Grassl, John Hletko, Kim Schaffer and Deb
Brown. Also in attendance Becky Bolte. Robin Ginner was present via Zoom.
Motion by Schaffer, 2
nd by Horant to approve the minutes of the 3-5-2026 meeting. Carried. Ayes: Forer,
Hletko, Grassl, Schaffer Abstained: Adamovich
a) Conditional Use Permit Public Hearing: Request by the Eagle River Historical Society to place
interpretive signs in Rotary Square, Silver Lake Beach Park and Riverview Park: Mayor Brown opened the
public hearing at 5:05pm. Executive Director for the Eagle River Historical Society, Vito Bortolotti
presented the plan for the signs to commemorate the 250 year celebration of American with local
history. Former Executive Director Karen Sailer, 111 S 2
nd, spoke in favor of the signs. Kathryn Craffey,
202 N 3rd, spoke on her concerns with the signs being cemented into the ground at the Square, soil
testing before installation, Historical Society hearing application having blanks, concerns that the history
of indigenous people was not presented on the proposed signs, concerns about sponsor recognition
being disguised as advertising. Bortolotti responded that he wanted to maintain historical integrity and a
second round of signs is in the planning stage that would include Native American history in the area,
anticipating within two years. The ER Historical Society continues to search out the history of indigenous
people in the area that dates back an estimated 10,000 years. Horant suggested affixing signs on the
neighboring building at the Square in lieu of having signs on or through the astro turf. Bortolotti is
working with Eagle River Revitalization on adjustments to signs and placement to avoid any damage to
the turf. Alice Kramer, 828 Meta Loon Trail, Town of Lincoln, clarified inception of why those parks were
chosen as the sites have geographical significance. Jessica Bortolotti, 112 Illinois, signs are a great
addition but encouraged those opposed to feel free to fundraise and put up their own signs. Jay
Johnstone, 112 Illinois, all for the signs, history of towns is great, but accuracy is important. Andy
Lichtfuss, 8414 Squash Lake Ln, Town of Three Lakes, City of Eagle River business owner, stated not every
sign is going to be able to capture all of our history but this is a good beginning. Chelsea Sims, 213 E Wall
St, spoke from Zoom with concerns of the lack of representation of the indigenous people. Discussion.
Horant asked that people be part of the solution, volunteer. Brown called for any other audience
comments. Annette Numrich, 1533 E Dollar Lk Rd, Town of Lincoln, the City of Madison has information
on their historical signs that reads; We recognize that this land is seeded property of the indigenous
peoples. Ginner reminded the audience that the Planning Commission is not tasked with what someone
can put on their signs citing First Amendment violation but instead on the physical sign structure not what
is on the sign. Emails received were then read aloud by Clerk Bolte - Kira Oas, 1508 Sandstone Circle,
Town of Lincoln requesting the signs include the highlights of the indigenous people here before us. Jim
Holperin, the Square Representative, requested that signs placed at the Square be portable, avoiding any
digging into the turf. Mayor Brown closed the Public Hearing at 5:28pm and brought conversation back to
the Commissioners. Grassl asked about the city receiving copy of sign before being put up. Hletko stated
signs should be portable and concerns with sponsorship portion being advertising. Schaffer spoke to the
city allowing a small signature on murals. Adamovich asked that park signs be portable for
plowing/mowing/events. Grassl asked about mounting signs onto buildings at parks. Bortolotti is open for
discussion on mounting and placement options. Motion by Horant, 2
nd by Forer to recommend City
Council approval of a conditional use permit to the Eagle River Historical Society to place interpretive signs
at the Square, Silver Lake Beach Park, and Riverview park with the condition that placement be done in
coordination with Public Works at City representatives’ discretion. Carried on a roll call vote, all.
b) Conditional Use Permit Public Hearing: Request by Amerco Real Estate Company/U-Haul for a
conditional use permit to construct two (2) self-storage units totaling 51,977 square feet at 1100 N.
Page 3
Ra
ilroad Street, EagleRiver, computer number 221-1019-06, in accordance with Chapter 106, Article VI,
Division 7, Sec 106-473Uses permitted by conditional grant, (8) Storage buildings not used for habitation
– human or animal. Shawn Odden, representative for U-Haul Company of WI, was present. Mayor Brown
confirmed a two-minute time limit for public comments. Odden stated they would like to partner with the
city to develop the property at 1100 N Railroad with approximately 520 climate controlled self-storage
units, 419 of which would be inside access. The approximate value of the facility would be $5 million at
completion. Schaffer asked petitioner; “Why this property” with Odden responding accessibility, price,
visibility and location. There will be one restroom in each building and estimating two people will be
employed. Schaffer stated city sewer and water was designed for higher usage and that our sewer and
water system would be underutilized by design. Ginner reminded all the standards to be applied from
City Ordinance; (c)Standards. No conditional use will be granted by the council or recommended by the
plan commission unless the use:(1) Addresses expected harmful project impacts.(2)Is so designed,
located and proposed to be operated that the public health, safety and welfare will be protected.(3)Will
not cause substantial injury to the value of other property in the neighborhood in which it is located
Mayor Brown opened the floor for public comments at 5:40PM. Vic Washelesky, 173 River St, spoke on
engineering background and presented information on expected project harmful impacts. Washelesky
presented calculations that with a 57,000 Sq Ft building on the property, allowing for 20% without
structure as required impervious surface, the comparison of rainfall runoff without project and with
would result in 6x the amount of rainfall runoff with nowhere to go. Washelesky spoke on the height of
Bluebird Road, lack of a ditch, and citing water pooling already a problem. Vito Bortolotti, 319 N Main,
spoke on the detrimental impacts on his family owned business of Bortolotti’s Cin Cin, including
aesthetics, light pollution and visibility. Karen Sailer, 111 S 2
nd, objected to the project, stating Eagle River
is a tourist destination and Eagle River Revitalization spends a lot of time and money to make the area
beautiful to attract tourism and business. Kathryn Craffey, 202 N 3rd, questioned the total number of
units to be built, reported unreadable information in the public packets, concerns for lack of policies,
storage units do not support the largest industry of tourism, reported lack of land use and growth
management policies, wanted a minimum of a plan that is more aesthetically pleasing, suggested land be
used for affordable housing or retail. Jess Bortolotti, 112 Illinois and business at 1114 Bluebird, stated
flooding is a major issue in that area and they have had to put in drainage pond at their business.
Advertising is geared towards small town feel and nature and feels storage units are the wrong image for
the city. The project would not bring in jobs or service into the area. Andy Lichtfuss, 8414 Squash Lake Rd,
Three Lakes, VP Chamber of Commerce, ERRP Board, owner of Andy’s Pontoon Saloon on Wall St, spoke
with WI Economic Develop for stats, the city is small with less than 1700 residents with 765,000 tourists
visiting annually. Lichtfuss stated there are better uses for that property that would benefit tourism and
locals. Jay Stock, Tribute Brewing, 1106 N Bluebird, the project would be detrimental to his business
agreeing with opposition already provided, citing location by airport restrictions in height of and signage
problems. Annette Numrich, 1533 E Dollar Lake Rd, Town of Lincoln, concerns with aesthetics as people
approach the city, stated the city is losing what draws people to our area with billboards and metal
buildings. Taylor Garrison, 319 N Main, stated that area is near the Northland Pines Schools and
snowmobiling events, stating the project would impact the residents and tourists. Shawn Odden,
petitioner, replied: U-Haul civil engineers can look at water detention/run-off control, the building will
have a low profile blocking visibility less than what could go in there, proposal has a few options for
building design, there will be no unit access doors to the street side, his data shows there is a huge
demand for storage. Odden reported U-Haul uses the highest level of security, code access to get into the
main building, getting notices when people access the units and notices if any unit has been accessed for
more than four hours. U-Haul is open to landscaping. Letters received where then read into record. In
Opposition to the proposed storage unit project: Alice Kramer - President of the ER Historical Society,
Jessica Bortolotti - 112 Illinois Rd and 112 Illinois and business at 1114 Bluebird, Karen Sailer - 111 S 2
nd,
Vito Bortolotti - 314 N Main, Chelsea Sims - 213 E Wall St, Wendy Harris - Town of Lincoln, Melissa Deal –
121 N Main, Deborah Magee – 537 N Bond, Kari Kirschbaum – property owners at 311 Spruce and 214 N
3rd, Carol Marshall – Town of Lincoln, Dottie Reeder – Town of Lincoln, Katherine Kolb – Town of
Washington. At 6:45PM Mayor Brown closed to public comments and brought conversation up to the
Page 4
C
ommissioners. Discussion. Schaffer asked Vic Washelesky, who was an Engineer, what would have to be
done to accommodate the runoff from a business that size. Washelesky stating it depends on different
factors but recommended a condition that detention needs to be a certain way to address it and
requiring a landscaping plan. Adamovich stated that currently the storm sewer is only on the highway, so
Bluebird side would run down to Cin Cin and Tribute. Schaffer confirmed two expected employees and
that the sewer water system would be underused with only two bathrooms. Hletko confirmed proposed
height of building at 11’. Horant presented need for landscaping plan including buffers, lighting plan,
confirmed the cut in would not be from highway, options for material used for siding, concerns of
signage/visibility to the existing businesses on Bluebird and sign height near the airport, and stated the
project doesn’t address housing or job creation issues in the community. Horant reminded all that the
property has remained for sale for decades with no one purchasing. U-Haul representative Odden
responded they would be open to monument signage to address signs to neighboring businesses. Horant
expressed concerns on impact of small businesses on Bluebird and stated with all buildings in proposed
project, it’s 57,000 Square Feet. Forer stated on site stormwater management is a must and expressed
concerns on security and how taxing security would be on the ER Police Department. Adamovich asked
how many people the project would bring into the building daily with Odden replying that an average
would be 25 visits per day. Grassl, we want business, and we want a Northwoods aesthetic, we want job
creation, and people can’t find a place to live. The property has sat empty for 50 years. Grassl stated he
was willing to compromise but that there was a lot to consider. Hletko, concern with water mitigation and
reiterated that residents don’t like storage units. Hletko also voiced that the property has sat empty for
50 years and any development would block the view to Cin Cin and Tribute. Odden stated underground
water detention could be under driveway, but they would start with above ground options. Holly
Tomlanovich confirmed the placement would not interfere with existing trail system. Motion by Horant,
2
nd by Hletko to postpone any action until June 4th, 2026, Planning Commission regular meeting when
developer can come back with detailed plans to be reviewed by the Commissioners, including; water
retention, landscaping, signage, lighting plan, and siding samples. Carried on a roll call vote, all.
c) O
rdinance Amendment Public Hearing: Ordinance to Amend Chapter 106 (Zoning) of the Municipal
Code of the City of Eagle River, Wisconsin, by adding a Definition of "Excavation" to Section 106-1: Motion
by Hletko, 2nd by Grassl to recommend City Council adoption of presented ordinance, changing 500 cubic
yards to 500 cubic feet, to read: Excavation. Any man-made cut, cavity, trench, depression, hole, or open
pit in the earth's surface formed by the removal of soil, rock, earth, sand, gravel, or other materials,
whether by mechanical equipment, hand tools, blasting, or other means. Excavation includes, but is not
limited to, activities for foundations, basements, footings, trenches for utilities, grading for site
preparation, or removal of unsuitable materials. This term does not include minor landscaping grading
t
hat does not exceed 12 inches in depth or 500 cubic feet in volume, or routine maintenance activities
exempted under other provisions of this Code. Carried on a roll call vote, all.
d) D
ennis Meadows, Formal Request: Purchase of City-Owned Parcel Adjacent to 655 N Bond: Discussion
with petitioner Dennis Meadows, Commission, and the public. Discussion. Concerns heard on selling
public land and setting precedence. Motion by Horant, 2nd by Forer to postpone to June 4, 2026, Planning
Co
mmission meeting to allow PC to obtain legal counsel. Carried on a roll call vote, all.
e) C
omprehensive Plan update: Eric Sonnleitner was present for North Central Wisconsin Regional
Planning Commission. Mayor Brown stated letters requesting Riverside Park have been received and
d
istributed to Commission members, but the discussion would remain on task with the agenda, by
Commission members. Review of NCWRPC updates of Chapters 1-3 discussed at the March 5, 2026,
Planning Commission meeting. Chapter 4 - Utilities & Community Facilities was read through by
S
onnleitner with little input. Grassl called for adjournment citing lack of participation as meeting has
been going for over three hours. Remaining agenda items to be addressed at the next meeting of the Plan
Commission.
Motion by Grassl, 2nd by Horant to adjourn at 8:15PM. Carried, all.
Page 5
Page 6
Application for a Hearing before Planning Commission
Fee: $300, payable at application
Applicant MUST provide the following information:
Name Phone
Mailing Address __________________________________ Email
Interest in the Property
Name of Property Owner
Project Site Address
The above signed applicant does petition the City Council as follows:
Amend the Zoning Classification or Boundaries of a District
Change may only be initiated by the City Council, Plan Commission or a petition by one or
more of the owners or lessees of the property proposed to be changed.
Pres
ent Zoning Classification
Requested Zoning Classification
Applicant must provide the following information
Legal description and address of the property in question.
A sketch drawn to a scale of not less than 100 feet to the inch, showing area to
be changed, its location, the location of the existing boundaries and the uses
within 300 feet of the property proposed to be changed.
Property owners names, mailing address of all property within 300 feet of
the property in question.
Present use of the property in question.
Proposed use of the property in question.
Page 7
Page 8
Page 9
Signed _________________________________________________________________ Date __________________
Permit Fee _______________ Zoning District ____________
Minimum Setbacks:
City of Eagle River Permit Application
Site Address ____________________________________________Permit # ________________________
Building Signs Conditional Use Re-Zoning
Demolition Excavation Moving (Deposit Required) Other ______________
The undersigned her e by applies for a permit to do the work herein described and located on the application. The undersigned
agrees that all work will be done in accordance with the Municipal Code of the City of Eagle River and wit h the statues of the
State of Wisconsin Administrative Code applicable to the said premise.
A
pplicant Name _______________________________________ Phone # __________________________________
Mailing Address _______________________________________ Email: ___________________________________
Intended Pur pos e of Application ____________________________________________________________________
Project Cost: ________________________________ Size of Structure _____________________________________
Contractor Name _N/A___________________________Phone # __N/A________________________________
It is understood no structure or improvement may be constructed on City owned property, utility easements or highway right of
ways without specific written permission from the City Council or designated representative. When establishing the site for
construction, grade
will be as established by City Council’s designated representative. __SC_________ (Initial)
Expiration of Permit: If no Zoning Compliance certificate is issued within two years of the date of the issuance of the
building
permit, such building permit shall lapse. The holder of the permit must apply for an extension to the Administrator
who may grant an extension. If no compliance certificate is issued within twenty-four months of the date of the issuing of the
building permit, such building permit shall lapse. The holder of the building permit may apply for a re-issue of the building
permit to the Administrator. It is understood the total building permit fee will be assessed at this time. By the granting of this
permit the undersigned agrees to allow Administrator unfettered and unlimited access to the subject property for inspections to
determine compliance to the City of Eagle River Code of Ordinances and applicable laws.
Diggers
Hotline MUST be contacted prior to the start of the excavation 1-800-242-8511. ___________ (Initial)
Signature
of Applicant or Agent ______________________________________________ Date _________________
This pe
rmit is a zoni ng permit only. The improvement may require a building permit. For single family and two
family residential properties you need to contact Baas Inspection Agency LLC at 715 891 0323 to determine if you
need a building permit and inspection. For Commercial Property and Multi Family (4 or more units) you need to
contact the State Building Inspector for District 7.
Front ________ Corner Side ________ Each Side ________ Rear ________ Max Height ______
Site Plan Required _______________________________ Approved ______________________________________
Remarks ______________________________________________________________________________________
______________________________________________________________________________________________
______________________________________________________________________________________________
Zoning Administrator
For Office Use Only:
Permit distribution: Clerk (w/check) Light & Water Fire Dept.(commercial only) File
Payment: $____________ Cash Check #_____________ Date:______________ Admin:_______ Date _______
Page 10
Office of Zoning & Administration 525 E. Maple Street, PO Box 1269, Eagle River, WI 54521 715-479-8682
https://eagleriverwi.gov/
NOTICE OF PUBLIC HEARING
Posted 05/12/2026
Amerco Real Estate Company/U -Haul is requesting a conditional use permit to construct two (2)
self-storage units totaling 51,977 square feet at 1100 N. Railroad Street, Eagle River, computer
number 221-1019-06, in accordance with Chapter 106, Article VI, Division 7 , Sec 106 -473 Uses
permitted by conditional grant, (8 ) Storage buildings not used for habitation – human or animal.
The property, zoned as Highway Commercial, is described as: Sec. 28, T40N, R10E PRT NW NW .
Complete legal in tax roll.
The City of Eagle River Planning Commission will hold a public hearing to review the request on
Thursday, June 4, 2026 at 5:00 p.m. located at the Eagle River City Hall, 525 E. Maple Street, Eagle
River WI 54521. Comments can be made at the public hearing or by mail to City Administrator,
PO. Box 1269, Eagle River, WI 54521; by phone (715) 479- 8682 x227 or email
rcginner@eagleriverwi.gov. Documents will be available for review at City Hall. PETITIONERS, OR
THEIR REPRESENTATIVES, SHALL BE PRESENT.
Page 11
Legal Notice
Publish twice, beginning April 20, 2026 – Affidavit requested
NOTICE OF PUBLIC HEARING
CITY OF EAGLE RIVER PLANNING COMMISSION
Amerco Real Estate Company/U-Haul is requesting a conditional use permit to construct two (2) self-
storage units totaling 51,977 square feet at 1100 N. Railroad Street , Eagle River, computer number
221-1019-06, in accordance with Chapter 106, Article VI, Division 7 , Sec 106-473 Uses permitted by
conditional grant, ( 8) Storage buildings not used for habitation – human or animal. The property,
zoned as Highway Commercial, is described as: Sec. 28, T40N, R10E PRT NW NW . Complete legal in
tax roll.
The City of Eagle River Planning Commission has scheduled a public hearing for Thursday, May 7, 2026
at 5 pm, located in the Eagle River Common Council Chambers, 525 E. Maple Street, Eagle River, WI
54521.
Comments can be made in person at the public hearing or by mail to City Administrator, PO. Box 1269,
Eagle River, WI 54521; by phone (715) 479- 8682 x227 or email rcginner@eagleriverwi.gov .
Documents will be available for review at City Hall. PETITIONERS, OR THEIR REPRESENTATIVES, SHALL
BE PRESENT.
Page 12
STATE OF WISCONSIN DOT
, WI 00000
CITY OF EAGLE RIVER
PO BOX 1269
EAGLE RIVER, WI 54521
SENIOR EAGLE RIVER INC
VOLUNTEER ENTERPRISE
EAGLE RIVER, WI 54521
LIZCO SUPER 8 INC
3910 INDIAN LAKE RD
RHINELANDER, WI 54501
ERINS PUB AND GRUB LLC
2141 ADAM RD
EAGLE RIVER, WI 54521
GREGORY A HERFINDAHL TRUST
118 AIRPORT RD
EAGLE RIVER, WI 54521
INDIANHEAD OIL CO LLC
PO BOX 52085 DC-17
PHOENIX, AZ 85249
ASPIRUS BUILDINGS INC
2200 WESTWOOD DR
WAUSAU, WI 54401
EAGLE CAR WASH LAND LLC
PO BOX 1835
EAGLE RIVER, WI 54521
KEY 23 INVESTMENTS LLC
PO BOX 914
EAGLE RIVER, WI 54521
TRIBUTE HOLDINGS LLC
39 OAKWOOD DR
NAPERVILLE, IL 60540
BRIAN P ROTH
5408 RAZORBACK RD
CONOVER, WI 54519
WCD HOLDINGS LLC
PO BOX 1808
EAGLE RIVER, WI 54521
Page 13
Page 14
FNDIP-3/4"
FNDIP-3/4"
FNDIP-1" FNDIP-1"
1644.9
1644.6
FNDIP-3/4"
1645.4
1645.3
1645.4
1645.21645.4
1645.4
1645.8
1646.4 1646.0 1645.5
1643.9
1644.0
1643.0
1642.5
1642.4 1641.9
1642.2
1644.00
RIM:1644.86
INV:1635.36
STAMP/SIGNATURE:
SCALE NOTE:
SURVEYED BY: OTHERS
DESIGNER: DUSTIN VREELAND
FILE NO.: 26-0159
PROJECT:
LOCATION:
REVISIONS
DATE BYDESCRIPTION
SHEET
SCALE:
ORIGINAL PLAN DATE: 5/28/2026
TITLE PAGE:
PREPARED FOR:PLAN DATE:
C3
1" = 30'
Page 15
FNDIP-3/4"
FNDIP-3/4"
FNDIP-1" FNDIP-1"
1644.9
1644.6
FNDIP-3/4"
1645.4
1645.3
1645.4
1645.21645.4
1645.4
1645.8
1646.4 1646.0 1645.5
1643.9
1644.0
1643.0
1642.5
1642.4 1641.9
1642.2
1644.00
RIM:1644.86
INV:1635.36
STAMP/SIGNATURE:
SCALE NOTE:
SURVEYED BY: OTHERS
DESIGNER: DUSTIN VREELAND
FILE NO.: 26-0159
PROJECT:
LOCATION:
REVISIONS
DATE BYDESCRIPTION
SHEET
SCALE:
ORIGINAL PLAN DATE: 5/28/2026
TITLE PAGE:
PREPARED FOR:PLAN DATE:
C4
1" = 30'
Page 16
FNDIP-3/4"
FNDIP-3/4"
FNDIP-1" FNDIP-1"
FNDIP-3/4"
1645.4
1646.2
OAK34
1645.0
PIN81644.9
PIN9
1645.0
PIN8
1645.4
PIN8
1645.4
PIN8
1645.4
PIN7
1645.3
PIN7
1646.2
PIN9
1646.0
PIN7
1646.5
PIN14
1645.3
1645.4
1645.21645.4
1645.4
1645.8
1646.4 1646.0 1645.5
1642.4
1644.00
RIM:1644.86
INV:1635.36
118,014 S.F.(2.71 ACRES)
STAMP/SIGNATURE:
SCALE NOTE:
SURVEYED BY: OTHERS
DESIGNER: DUSTIN VREELAND
FILE NO.: 26-0159
PROJECT:
LOCATION:
REVISIONS
DATE BYDESCRIPTION
SHEET
SCALE:
ORIGINAL PLAN DATE: 5/28/2026
TITLE PAGE:
PREPARED FOR:PLAN DATE:
C2
1" = 30'
Page 17
FNDIP-3/4"
FNDIP-3/4"
FNDIP-1" FNDIP-1"
1644.9
1644.6
FNDIP-3/4"
1645.4
1645.3
1645.4
1645.21645.4
1645.4
1645.8
1646.4 1646.0 1645.5
1643.9
1644.0
1643.0
1642.5
1642.4 1641.9
1642.2
1644.00
RIM:1644.86
INV:1635.36
STAMP/SIGNATURE:
SCALE NOTE:
SURVEYED BY: OTHERS
DESIGNER: DUSTIN VREELAND
FILE NO.: 26-0159
PROJECT:
LOCATION:
REVISIONS
DATE BYDESCRIPTION
SHEET
SCALE:
ORIGINAL PLAN DATE: 5/28/2026
TITLE PAGE:
PREPARED FOR:PLAN DATE:
C4
1" = 30'
EROSION CONTROL SCHEDULING
1.INSTALL PERIMETER EROSION CONTROL. INSTALL INLET PROTECTION ON ALL CATCH BASIN DOWNSTREAM OF SITE EVEN IF
NOT CALLED OUT ON THIS SHEET.
2. BEGIN DEMOLITION FOR NEW BUILDING.
3. BEGIN ROUGH GRADING AND UTILITY INSTALLATION.
4. DURING GRADING ACTIVITIES EXISTING GRASS AND VEGETATION, TO BE REMOVED, SHALL REMAIN IN PLACE FOR AS LONG AS
POSSIBLE, TO AVOID SEDIMENT TRANSPORT.
5. ALL DISTURBED AREAS SHALL BE STABILIZED, TEMPORARILY AND/OR PERMANENT, WITHIN 30 DAYS OF DISTURBANCE, OR
PERMANENTLY STABILIZED WITHIN 7 DAYS OF ACHIEVING FINISHED GRADE.
6. IF DISTURBED AREAS MUST BE LEFT OVER WINTER, AN ANIONIC POLYACRYLAMIDE SHALL BE APPLIED TO ALL DISTURBED
AREAS PRIOR TO GROUND FREEZE. SEE SPECIFICATIONS FOR DETAILS.
PROPOSED EROSION CONTROL ACTIVITIES
Page 18
STAMP/SIGNATURE:
SCALE NOTE:
SURVEYED BY: OTHERS
DESIGNER: DUSTIN VREELAND
FILE NO.: 26-0159
PROJECT:
LOCATION:
REVISIONS
DATE BYDESCRIPTION
SHEET
SCALE:
ORIGINAL PLAN DATE: 5/28/2026
TITLE PAGE:
PREPARED FOR:PLAN DATE:
C6
1" = 30'
Page 19
FNDIP-3/4"
FNDIP-3/4"
FNDIP-1" FNDIP-1"
1644.9
1644.6
FNDIP-3/4"
1645.4
1645.3
1645.4
1645.21645.4
1645.4
1645.8
1646.4 1646.0 1645.5
1643.9
1644.0
1643.0
1642.5
1642.4 1641.9
1642.2
1644.00
RIM:1644.86
INV:1635.36
STAMP/SIGNATURE:
SCALE NOTE:
SURVEYED BY: OTHERS
DESIGNER: DUSTIN VREELAND
FILE NO.: 26-0159
PROJECT:
LOCATION:
REVISIONS
DATE BYDESCRIPTION
SHEET
SCALE:
ORIGINAL PLAN DATE: 5/28/2026
TITLE PAGE:
PREPARED FOR:PLAN DATE:
C7
1" = 30'
Page 20
FNDIP-3/4"
FNDIP-3/4"
FNDIP-1" FNDIP-1"
1644.9
1644.6
FNDIP-3/4"
1645.4
1645.3
1645.4
1645.21645.4
1645.4
1645.8
1646.4 1646.0 1645.5
1643.9
1644.0
1643.0
1642.5
1642.4 1641.9
1642.2
1644.00
RIM:1644.86
INV:1635.36
STAMP/SIGNATURE:
SCALE NOTE:
SURVEYED BY: OTHERS
DESIGNER: DUSTIN VREELAND
FILE NO.: 26-0159
PROJECT:
LOCATION:
REVISIONS
DATE BYDESCRIPTION
SHEET
SCALE:
ORIGINAL PLAN DATE: 5/28/2026
TITLE PAGE:
PREPARED FOR:PLAN DATE:
C8
1" = 30'
Page 21
Page 22
PREMIUM QUALITY LIGHTING® • Phone: 800-323-8107
© P .Q.L., Inc. • 2285 Ward Avenue • Simi Valley, CA 93065
www.PQLighting.com
Rev: 08/01/2025
CUTOFF WALL PACKS
LED EXTERIOR LIGHTING
LED Cutoff Wall Packs are high quality, designed for outdoor use. Perfect for
illuminating entrances, walls, and providing added security lighting. Our energy-
saving wall packs deliver bright, uniform light with a long life (50,000 hrs) significantly
reducing maintenance costs and energy use over the life of the fixture, quickly paying
for itself.
Application: Ideal for commercial and industrial applications; building entrances,
walkways, security and perimeter lighting.
Fixtures are available in a variety of finishes and color temperatures.
Contact your sales representative to discuss your specific needs.
Page 2-3
Page 4
Page 23
PREMIUM QUALITY LIGHTING® • Phone: 800-323-8107
© P .Q.L., Inc. • 2285 Ward Avenue • Simi Valley, CA 93065
www.PQLighting.com
Rev: 08/01/2025
SPEC-SELECT™ STEALTH
FULL CUTOFF WALL PACK
LED EXTERIOR LIGHTING
WATTS ITEM# DESCRIPTION DLC® CCT LUMENS LPW BEAM CRI VOLTS FINISH
LIFE
HOURS
TRAD.
EQUIV. CASE
20/30
45/50 83910 F. CUTOFF WALL PACK/20-30-45-50W/30-50K/120-277V/BRZ
Qualification Model # SPSTLWP-50-[L;H]V- [C;MC;PC;PSC;SC]-TK 30-50K 1500-
6343 127 Type III 73 120-277 BRONZE 50,000 100-
175W 1
83913 F. CUTOFF WALL PACK/20-30-45-50W/30-50K/120-277V/WHT
Qualification Model # SPSTLWP-50-[L;H]V- [C;MC;PC;PSC;SC]-TK 30-50K 1500-
6343 127 Type III 73 120-277 WHITE 50,000 100-
175W 1
80/90
100/120 83911 F. CUTOFF WALL PACK/80-90-100-120W/30-50K/120-277V/BRZ
Qualification Model # SPSTLWP-120-[L;H]V- [C;MC;PC;PSC;SC]-TK 30-50K 9600-
14500 121 Type III 73 120-277 BRONZE 50,000 250-
400W 1
83915 F. CUTOFF WALL PACK/80-90-100-120W/30-50K/120-277V/WHT
Qualification Model # SPSTLWP-120-[L;H]V- [C;MC;PC;PSC;SC]-TK 30-50K 9600-
14500 121 Type III 73 120-277 WHITE 50,000 250-
400W 1
ACCESSORIES Check fixture TDS to confirm compatibility of accessories.
WATTS ITEM# DESCRIPTION CASE
83336 BUTTON STYLE PHOTO CELL FOR LED WALL PACK/120-277V 70
4 55704 EMERGENCY PACK FOR LED FIXTURE 4W/90 MIN/IP65 2 & 1 TEST LIGHT AND BUTTON (Not for use on fixtures over 50W) 50
FEATURES
• Selectable Wattage & Color Temperature
(3000K, 4000K, 5000K)
• High Efficiency, Energy Saving
• Durable Construction
• Mercury Free - Environmentally friendly.
• Vibration and shock resistant
• Wet Location Rated
• Bronze or White finish
• Ideal for security, walkways and
perimeter lighting.
Key: P = Pending / LPW = Lumens Per Watt / TRAD. EQUIV. = Traditional Equivalent
Note: Warranty and Qualifications can vary per item, see technical data sheets (TDS) for specific information. • Not all product variations listed
are DLC® qualified. Visit www.designlights.org/search to confirm qualification. • Published lumens on LED products are approximate and may vary
slightly. • Specifications are subject to change without notice. • Photos and drawings may not be to scale and are for general reference only.
* 83336 and 83895 or 55704 (4W EM Battery) cannot be used together; one accessory prevents the other from fitting in the fixture.
55704
83336
Page 24
PREMIUM QUALITY LIGHTING® • Phone: 800-323-8107
© P .Q.L., Inc. • 2285 Ward Avenue • Simi Valley, CA 93065
www.PQLighting.com
Rev: 08/01/2025
STEALTH FULL CUTOFF WALL PACK
LED EXTERIOR LIGHTING
WATTS ITEM# DESCRIPTION DLC® CCT LUMENS LPW BEAM CRI VOLTS FINISH
LIFE
HOURS
TRAD.
EQUIV. CASE
30 83900 FULL CUTOFF WALL PACK/30W/50K/120-347V/BRZ
Qualification Model # STLWP-30-347-[D,P,M]-50K 5000K 4110 137 Type III 70 120-347 BRONZE 50,000 100W 1
ACCESSORIES Check fixture TDS to confirm compatibility of accessories.
WATTS ITEM# DESCRIPTION CASE
83896 MICROWAVE MOTION SENSOR FOR LED STEALTH™ FULL CUTOFF WALL PACK/12-24vDC 100
83336 BUTTON STYLE PHOTO CELL FOR LED WALL PACK/120-277V 70
4 55704 EMERGENCY PACK FOR LED FIXTURE 4W/90 MIN/IP65 2 & 1 TEST LIGHT AND BUTTON (Not for use on fixtures over 50W) 50
8 83893 EM BATTERY FOR LED STEALTH™ FULL CUTOFF WALL PACK/8W 90 MIN/120-277V (Not for use on fixtures over 150W) 20
FEATURES
• High Efficiency, Energy Saving
• Durable Construction
• Mercury Free - Environmentally friendly.
• Vibration and shock resistant
• Wet Location Rated
• Bronze finish
• Ideal for security, walkways and
perimeter lighting.
Key: P = Pending / LPW = Lumens Per Watt / TRAD. EQUIV. = Traditional Equivalent
Note: Warranty and Qualifications can vary per item, see technical data sheets (TDS) for specific information. • Not all product variations listed
are DLC® qualified. Visit www.designlights.org/search to confirm qualification. • Published lumens on LED products are approximate and may vary
slightly. • Specifications are subject to change without notice. • Photos and drawings may not be to scale and are for general reference only.
55704 83893
83896
83336
Page 25
PREMIUM QUALITY LIGHTING® • Phone: 800-323-8107
© P .Q.L., Inc. • 2285 Ward Avenue • Simi Valley, CA 93065
www.PQLighting.com
Rev: 08/01/2025
SPEC-SELECT™ DESIGNER
FULL CUTOFF WALL PACK
LED EXTERIOR LIGHTING
Key: P = Pending / LPW = Lumens Per Watt / TRAD. EQUIV. = Traditional Equivalent
Note: Warranty and Qualifications can vary per item, see technical data sheets (TDS) for specific information. • Not all product variations listed
are DLC® qualified. Visit www.designlights.org/search to confirm qualification. • Published lumens on LED products are approximate and may vary
slightly. • Specifications are subject to change without notice. • Photos and drawings may not be to scale and are for general reference only.
WATTS ITEM# DESCRIPTION DLC® CCT LUMENS LPW BEAM CRI VOLTS FINISH
LIFE
HOURS
TRAD.
EQUIV. CASE
0-10V DIMMING
40/50
60/80 83917 DESIGNER F.C.W.P/40-50-60-80W/30-50K/DIMM/120-277V/BRZ
Qualification Model # SSTWP-80[L;H]-[CS]-CC 30-50K 5212-
10399 130 93° 74 120-277 BRONZE 50,000 200-
400W 1
ACCESSORIES Check fixture TDS to confirm compatibility of accessories.
WATTS ITEM# DESCRIPTION CASE
83336 BUTTON STYLE PHOTO CELL FOR LED WALL PACK/120-277V 70
FEATURES
• Selectable Wattage & Color Temperature
(3000K, 4000K, 5000K)
• High Efficiency, Energy Saving
• Durable Construction
• Mercury Free - Environmentally friendly.
• Vibration and shock resistant
• Wet Location Rated
• Ideal for security, walkways and
perimeter lighting.
83336
Page 26
Storm W
ater Management 1
V
reeland Land Surveyors & Engineers
Project # 26-0159
E
rosion Control/Storm Water Management
Maintenance/Operation Plan
For
:
U-H
aul Eagle River
Prepar
ed By:
610
3 Dawn Street
Weston, WI 54476
Loca
ted in:
C
ity of Eagle River
Vilas County, WI
Da
ted:
May
28, 2026
Page 27
Storm W
ater Management 2
V
reeland Land Surveyors & Engineers
Project # 26-0159
TABLE OF C
ONTENTS
Stor
m Water Management Plan
U-Haul Eagle River
City of Eagle River, Wisconsin
1.0 BACK
GROUND & GENERAL INFORMATION................................................ 3
1.1 Introduction and Project Location .............................................................. 3
1.2 Project Description...................................................................................... 3
1.3 Project Requirements .................................................................................. 3
1.4 General Project Data ................................................................................... 3
2.0 EXISTING DRAINAGE CONDITIONS ............................................................... 4
2.1 Existing Drainage Area ............................................................................... 4
2.2 Existing Drainage Calculation Summary.................................................... 4
2.3 Existing Off-Site Drainage ......................................................................... 4
3.0 PROPOSED DRAINAGE CONDITIONS ............................................................. 4
3.1 Proposed Drainage Areas ............................................................................ 4
3.2 Post-Development Runoff Summary .......................................................... 4
3.3 Proposed Detention Areas........................................................................... 4
4.0 POST-DEVELOPMENT PERFORMANCE STANDARDS ................................ 5
4.1 Total Suspended Solids ............................................................................... 5
4.2 Infiltration ................................................................................................... 5
4.3 Peak Discharge............................................................................................ 5
4.4 Protective Area............................................................................................ 5
4.5 Summary ..................................................................................................... 5
5.0 CONSTRUCTION SITE PERFORMANCE STANDARDS ................................. 6
5.1 Erosion Control ........................................................................................... 6
5.2 Construction Site Erosion Control Measures .............................................. 6
5.3 Operation and Maintenance, Short-term ..................................................... 7
5.4 Operation and Maintenance, Long-term ..................................................... 7
6.0 SOIL AND SEDIMENT LOSS DISCHARGE ...................................................... 8
A
ppendices
A. Location Map
B. Geotechnical Data
C. Existing Drainage Map and Calculations
D. Proposed Drainage Map and Calculations
E. Soil Loss and Sediment Discharge Map and Calculations
F. State of Wisconsin Construction Site Inspection Report and Plan of Operation
Page 28
Storm W
ater Management 3
V
reeland Land Surveyors & Engineers
Project # 26-0159
Ero
sion Control/Storm Water Management
Maintenance and Operation Plan
for
U-Haul Eagle River
1.
0 BACKGROUND & GENERAL INFORMATION
1.1 Introduction and Project Location
Vreeland Associates has been retained by David Barnes to perform storm water management
calculations and prepare a storm water management plan per NR216.47 and NR151, for the
proposed shed buildings project. The project site is located at 1100 N Railroad Street Eagle River,
WI. The project is located in part of the Northwest ¼ of the Northwest ¼ of Section 28, Township
40 North, Range 10 East, City of Eagle River, Vilas County, Wisconsin.
1.2 Project Description
The proposed project consists of developing proposed 2.7 acres for indoor storage and parking lot.
The site will be graded for storm water management best management practices. (See Location
Plan in Appendix A).
1.3 Project Requirements
The project area includes approximately 2.7 acres that will be disturbed. Since the disturbed area
exceeds one acre, a Wisconsin Department of Natural Resources Notice of Intent
application/permit (NOI-WPDES per WDNR) is required.
The storm water management plan for this project is developed in accordance with the NOI-
WPDES requirements and NR216.47/NR151.121 for new development site.
1.4 General Project Data
Soils
Based
on existing soil mapping data from the Natural Resources Conservation Service (NRCS), the
existing subgrade soils are expected to be Rubicon sand, which are classified as hydrologic class
“A”. Stormwater test pits were performed by Partners. The borings found to topsoil overlaying fill
sand and sand. These borings are consistent with NRCS. The determined limiting factor for
stormwater infiltration was sand layer with an infiltration rate of 3.6 in/hr. The geotechnical data
containing soil hydrologic classes are attached in Appendix B.
Groundwater
At the site of
the proposed infiltration groundwater was encountered. Groundwater will be well
below the proposed project and will not be disturbed.
Wetlands
Accor
ding to the Wisconsin DNR Wetlands and Wetlands Indicator map, there are not identified
wetlands within the project limits.
Page 29
Storm W
ater Management 4
V
reeland Land Surveyors & Engineers
Project # 26-0159
2.
0 EXISTING DRAINAGE CONDITIONS
2.1 Existing Drainage Area
The existing site consists of one sub-basin (E1). Sub-basin E1 contains grass. E1 generally flows
to the northeast of the property. An existing drainage map can be found in Appendix C.
2.2 Existing Drainage Calculation Summary
Existing drainage calculations utilize TR-55 methodology and results for a 1, 2, 10 and 100-year
design storm are included. Existing drainage calculations are provided in Appendix C.
2.3 Existing Off-Site Drainage
Existing off-site storm water runoff draining onto the project site has been taken into consideration
for the existing or proposed drainage evaluation.
3.0 PROPOSED DRAINAGE CONDITIONS
3.1 Proposed Drainage Areas
The proposed site is divided into six sub-basins (D1-D5, 1S). 1S consists of runoff from the grass
area. Runoff from D1 consists of parking lot, building, and grass. Runoff from D1 is conveyed to
the north and will runoff into P1 for treatment and rate control. D2 consists of the parking lot,
building and grass area. Runoff from D2 is conveyed to the west into P2 for treatment and rate
control. D3 consists of runoff from the proposed buildings, parking lot and lawn area. Runoff from
D3 is conveyed into the proposed stormwater detention basin 3P for treatment and rate control. D4
consists of runoff from the proposed buildings, parking lot and lawn area. Runoff from D4 is
conveyed into the proposed stormwater detention basin 3P for treatment and rate control. D5
consists of runoff from the proposed buildings, parking lot and lawn area. Runoff from D5 is
conveyed into the proposed stormwater detention basin 3P for treatment and rate control. A
proposed drainage area map is provided in Appendix C.
3.2 Post-Development Runoff Summary
Proposed drainage calculations utilize TR-55 methodology and results for a 1, 2, 10 and 100-year
design storm have been attached. A proposed drainage area map and calculations are provided in
Appendix D.
3.3 Proposed Detention Areas
There are five proposed treatment and rate control devices for storm water management. Pond P1
is a stormwater infiltration basin that will be used for infiltration purposes, total suspended solids
removal and peak discharge control. Infiltration basin (1P) is located on the northeast corner of the
proposed project. The basin will have a culvert to flow into P2 to control the depth of water. An
emergency overflow has been included for extreme storm events. Pond P2 is a stormwater
infiltration basin that will be used for infiltration purposes, total suspended solids removal and
peak discharge control. Infiltration basin (P2) is located on the northwest side of the proposed
project. The basin will have a culvert to flow into P3 to control the depth of water. An emergency
overflow has been included for extreme storm events. Pond P3 is a stormwater infiltration basin
that will be used for infiltration purposes, total suspended solids removal and peak discharge
control. Infiltration basin (P3) is located on the west side of the proposed project. The basin will
have a culvert to flow into P4 to control the depth of water. An emergency overflow has been
included for extreme storm events. Pond P4 is a stormwater infiltration basin that will be used for
infiltration purposes, total suspended solids removal and peak discharge control. Infiltration basin
(1P) is located on the west side of the proposed project. An emergency overflow has been included
for extreme storm events. Pond P5 is a stormwater infiltration basin that will be used for
Page 30
Storm W
ater Management 5
V
reeland Land Surveyors & Engineers
Project # 26-0159
inf
iltration purposes, total suspended solids removal and peak discharge control. Infiltration basin
(P5) is located on the south side of the proposed project. An emergency overflow has been
included for extreme storm events. See Appendix C detention basin volume calculations.
4.0 POST-DEVELOPMENT PERFORMANCE STANDARDS
4.
1 Total Suspended Solids
1. Accor
ding to NR151.122, BMPs shall be designed in accordance with Table 1, or to the
maximum extent practicable. For new development projects Table 1 indicates that the
total suspended solids load from parking areas and roads shall be reduced by 80 percent,
based on an average annual rainfall, as compared to no runoff management controls.
The total suspended solids removal has been modeled in WinSLAMM version 10.5. According to
the WinSLAMM modeling the expected TSS removal from the entire site is 99.69% (excluding
the proposed grass swales) the proposed design meets the requirements of NR151.122. See
Appendix D for the WinSLAMM modeling inputs and outputs.
4.
2 Infiltration
NR 151 requires that the post-development site infiltrate 90% of the pre-development runoff based
on an average annual rainfall. Using WinSLAMM and HydroCAD the results show that the post-
development site infiltrates 99.94% of the average annual rainfall utilizing the infiltration basin
for infiltration. See Appendix D for input and output results using HydroCAD and WinSLAMM
and soil report for measured infiltration.
4.
3 Peak Discharge
Accor
ding to NR151.123(1), BMPs shall be employed to maintain or reduce the peak runoff
discharge rates, to the maximum extent practicable, as compared to pre-development conditions.
Th
e pre-development and post-development peak rates of discharge leaving the site are
summarized in the table below. Curve numbers used for the modeling of this site were Class C
soils per the soil borings completed by Star Environmental. See Appendix C for HydroCAD
modeling routing diagrams, summaries, and node listings.
P
re-D
evelopment P
ost-Development
Tot
al (E
1) Tot
al (2L)
1-ye
ar 24-hour
Peak Flow 0.00 cfs 0.00 cfs
2-ye
ar 24-hour
Peak Flow 0.00 cfs 0.00 cfs
10-year 24-hour Peak
Flow 0.01 cfs 0.00 cfs
10
0-y
ear 24-hour
Peak Flow 1.0
4 cfs 4.26 cfs
4.
4 Protective Area
Accor
ding to NR151.125(4)(e) areas of post-construction sites from which the runoff does not
enter the surface water, including wetlands, without first being treated by a BMP to meet the
requirements of 151.122 to 151.123, are exempt from meeting the requirements of the Protective
Areas performance standards. Not applicable.
4.
5 Summary
Th
e modeling of this site shows that the requirements set by the Department of Natural Resources
for total suspended solids, peak discharge, and infiltration can all be met with the proposed design.
Page 31
Storm W
ater Management 6
V
reeland Land Surveyors & Engineers
Project # 26-0159
Th
e Storm Water Management Plan shows basic compliance with accepted engineering practice in
hydrology planning and design. The resulting development will function as a positive addition to
the community while sustaining environmental benefits in storm water management and quality.
5.
0 CONSTRUCTION SITE PERFORMANCE STANDARDS
5.1 Erosion Control
The purpose of this control plan is to provide guidelines that comply with the state and local
requirements, as well as to make recommendations regarding erosion control and storm water
management. The construction of this development is a critical phase in terms of storm water
management and runoff control. Construction site erosion control will help minimize the impact of
development, enhance and protect local environment, and protect the surrounding project area by
applying best management practices for erosion control at construction sites. This work shall be
planned and executed in accordance with the Wisconsin Department of Natural Resources Storm
Water Management Technical Standards and/or accepted local engineering practice. The
owner/developer will be responsible for erosion control during the process of construction. Silt
fence, site vegetation, inlet protection, tracking pad, and erosion mat will be utilized to keep
sediment from leaving the construction site.
5.2 Construction Site Erosion Control Measures
The following erosion control devices may be used on the project site at any time during the
construction phases to ensure the compliance with NR 216 and local erosion control requirements,
as applicable.
a) Silt Fence (WDNR 1056)
Continuous silt fencing will be required along all areas downstream of disturbed area, and around
the base of all stockpiled material subject to sediment transportation during rain fall events
(stockpiled topsoil, gravel base, etc.). The silt fencing will provide a siltation barrier between the
disturbed area and any inlets and ultimately downstream water bodies. All silt fence shall be
removed upon completion of the project or when disturbed areas have generated sufficient
vegetation to prevent erosion and the threat of sediment reaching inlets and bodies of water.
b) Site Vegetation
Existing site vegetation outside of project limits shall be protected and maintained to the
maximum extent practicable. Existing site vegetation within the project limits shall remain
undisturbed until construction schedule warrants disturbance. For disturbed areas vegetation that
resists erosion, maintains slow storm water velocities, and retains sediment from runoff shall be
provided by the contractor. Temporary seeding may be required for disturbed areas that are subject
to long periods of construction inactivity. Temporary vegetation is used when areas are disturbed
and may remain unfinished long enough to allow vegetation to grow and assist with erosion
control. Permanent vegetation is encouraged as soon as possible in the construction process.
c) Tracking Pad (WDNR 1057)
Stone tracking pads will be constructed at all entrances to the construction site to minimize
sediment tracking onto existing streets. A minimum of one construction entrance is required for
the project site. Tracking pads are temporary and will be removed or much of the aggregate will be
removed before the site is completed.
d) Non-channel Erosion Mat (WDNR 1052)
Page 32
Storm W
ater Management 7
V
reeland Land Surveyors & Engineers
Project # 26-0159
Th
e purpose of this practice is to protect the soil surface from the erosive effect of rainfall and
prevent sheet erosion during the establishment of grass or other vegetation, and to reduce soil
moisture loss due to evaporation. This practice applies to both Erosion Control Re-vegetative Mats
(ECRM) and Turf-Reinforcement Mats (TRM).
1. CLASS I: A short-term duration (minimum of 6 months), light duty, organic mat
with photodegradable plastic or biodegradable netting.
a. Type A – Use on erodible slopes 2.5:1 or flatter.
b. Type B – Double netted product for use on erodible slopes 2:1 or flatter.
e) Waste and Material Disposal
All waste and unused building materials (including garbage, debris, cleaning wastes, or other
construction materials) shall be properly disposed of and not allowed to be carried by runoff into a
receiving channel or inlet.
5.3 Operation and Maintenance, Short-term
The owner of this project is directly responsible for implementation and maintenance of the
construction site erosion control measures.
The Contractor shall conduct the following inspections:
Weekly inspections of implemented erosion and sediment controls.
Inspections of erosion and sediment controls within 24 hours after precipitation event 0.5
inches or greater which results in runoff during active construction periods.
The Contractor shall maintain weekly written reports of all inspections that include:
The date, time, and exact place of the inspection.
The name of the individual who performed the inspection.
An assessment of the condition of erosion and sediment controls.
A description of any erosion and sediment control implementation and maintenance
performed.
A description of the present phase of construction at the site.
Repairs shall be made immediately, as required, to maintain effectiveness, until permanent
vegetation is established. All repairs to erosion control devices shall be documented on the
Wisconsin Department of Natural Resources Construction Site Inspection Report (Form 3400-
187). A copy of Form 3400-187 can be found in Appendix F.
5.4 Operation and Maintenance, Long-term
The OWNER of this project is directly responsible for the operation, inspection, and maintenance
of all storm water facilities located within the project site, as described below.
Infiltration Basin:
Inspection: Look for accumulation of sediment and/or debris in basin and riprap. Length
of time water is retained in basin. Look for erosion or damage. Review plant health;
look for weeds and grasses encroaching on plants.
Maintenance: Remove accumulated sediment deposits and/or debris in basin and riprap
and repair any eroded or damaged grass areas. Remove any identified weeds or grasses.
Do not plow/store snow in bio-retention basin. Annually mow the side slopes to reduce
brush and other large root vegetation that may weaken the berms. Once every five years,
deep-till infiltration basin promotes infiltration.
Grass Swale:
Page 33
Storm W
ater Management 8
V
reeland Land Surveyors & Engineers
Project # 26-0159
In
spection: Look for accumulation of sediment and/or debris in pond and riprap. Look
for erosion or damage. Review plant/grass health.
Maintenance: Remove accumulated sediment deposits and/or debris in swale and riprap
and repair any eroded or damaged grass areas. If water is retained for more than 24-48
hours after a storm event, replace topsoil by removing the top 6” of topsoil, tilling bottom
of basin, installing new topsoil and restoring grass in basin.
6.0 SOIL AND SEDIMENT LOSS DISCHARGE
Th
e Wisconsin DNR requires that all construction sites must lose less than 5 tons per acre of
sediment during the construction of the project. The DNR Soil Loss & Sediment Discharge
Calculation Tool version 2.0 was used to determine the construction site sediment discharge.
Using the worst-case scenario of a fully disturbed site and the maximum possible flow length, the
calculations show that the soil loss is 1.7 tons/acre and the sediment discharge is 1.0 tons/acre.
This assumes silt fence sediment control practices. This meets the DNR requirements.
Calculations are shown in Appendix E. Soil Loss map shows the worst case scenario.
Page 34
AP
PENDIX A
Location Map
Page 35
Page 36
Page 37
AP
PENDIX B
Geotechnical Data
Page 38
Hydrologic Soil Group—Vilas County, Wisconsin
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
5/28/2026
Page 1 of 4
5088610 5088640 5088670 5088700 5088730 5088760 5088790 5088820 5088850 5088880
5088610 5088640 5088670 5088700 5088730 5088760 5088790 5088820 5088850
324880 324910 324940 324970 325000 325030 325060
324880 324910 324940 324970 325000 325030 325060
45° 55' 52'' N
89° 15' 32'' W
45° 55' 52'' N
89° 15' 22'' W
45° 55' 43'' N
89° 15' 32'' W
45° 55' 43'' N
89° 15' 22'' WN
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 16N WGS84
0 50 100 200 300
Feet
0 15 30 60 90
Meters
Map Scale: 1:1,340 if printed on A portrait (8.5" x 11") sheet.
Soil Map may not be valid at this scale.
Page 39
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Lines
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Points
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:20,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below
.
Soil Survey Area: Vilas County, Wisconsin
Survey Area Data: Version 23, Sep 10, 2025
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger
.
Date(s) aerial images were photographed: Aug 16, 2021—Sep
1, 2021
The orthophoto or other base map on which the soil lines were
compiled and digitized probably dif
fers from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Hydrologic Soil Group—Vilas County, Wisconsin
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
5/28/2026
Page 2 of 4
Page 40
Hydrologic Soil Group
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
3174B Rubicon sand, 0 to 6
percent slopes
A 3.1 100.0%
Totals for Area of Interest 3.1 100.0%
Description
Hydrologic soil groups are based on estimates of runoff potential. Soils are
assigned to one of four groups according to the rate of water infiltration when the
soils are not protected by vegetation, are thoroughly wet, and receive
precipitation from long-duration storms.
The soils in the United States are assigned to four groups (A, B, C, and D) and
three dual classes (A/D, B/D, and C/D). The groups are defined as follows:
Group A. Soils having a high infiltration rate (low runoff potential) when
thoroughly wet. These consist mainly of deep, well drained to excessively
drained sands or gravelly sands. These soils have a high rate of water
transmission.
Group B. Soils having a moderate infiltration rate when thoroughly wet. These
consist chiefly of moderately deep or deep, moderately well drained or well
drained soils that have moderately fine texture to moderately coarse texture.
These soils have a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet. These consist
chiefly of soils having a layer that impedes the downward movement of water or
soils of moderately fine texture or fine texture. These soils have a slow rate of
water transmission.
Group D. Soils having a very slow infiltration rate (high runoff potential) when
thoroughly wet. These consist chiefly of clays that have a high shrink-swell
potential, soils that have a high water table, soils that have a claypan or clay
layer at or near the surface, and soils that are shallow over nearly impervious
material. These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is
for drained areas and the second is for undrained areas. Only the soils that in
their natural condition are in group D are assigned to dual classes.
Rating Options
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Hydrologic Soil Group—Vilas County, Wisconsin
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
5/28/2026
Page 3 of 4
Page 41
Tie-break Rule: Higher
Hydrologic Soil Group—Vilas County, Wisconsin
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
5/28/2026
Page 4 of 4
Page 42
AP
PENDIX C
Existing & Proposed Drainage Map and Calculations
Page 43
1645.4
PROP
1" = 60'
STAMP/SIGNATURE:
SURVEYED BY: OTHERS
DESIGNER: DUSTIN VREELAND
FILE NO.: 26-0159
PROJECT:
LOCATION:
REVISIONS
DATE BYDESCRIPTION
SHEET
SCALE:
ORIGINAL PLAN DATE: 5/28/26
TITLE PAGE:
PREPARED FOR:PLAN DATE:
Page 44
D1
D1
D2
D2
D3
D3
D4
D4
P1 P2 P3 P4
1
L
li
nk
R
outing Diagram for 26-0159 north
Prepared by Vreeland Associates, Printed 5/28/2026
Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Subcat Rea
ch Pond L
ink
Page 45
2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 2Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
R
ainfall Events Listing
Event# Event
Nam
e
Storm Type Curve Mode Duration
(hours)
B/B Depth
(inches)
AMC
1 1-
Year MSE 24-hr 4 Default 24.00 1 2.22 2
2 2-Year MSE 24-hr 4 Default 24.00 1 2.56 2
3 10-Year MSE 24-hr 4 Default 24.00 1 3.79 2
4 100-Year MSE 24-hr 4 Default 24.00 1 6.43 2
Page 46
2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 3Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
A
rea Listing (all nodes)
Are
a
(acres)
CN Description
(subcatchment-numbers)
0.368 39 >75%
Grass cover, Good, HSG A (D1, D2, D3, D4)
0.026 98 basin (D1, D2, D3, D4)
0.657 98 building (D1, D2, D3, D4)
0.504 98 parking lot (D1, D2, D3)
1.555 84 TOTAL AREA
Page 47
2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 4Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ipe Listing (all nodes)
Line# Nod
e
Number
In-Invert
(feet)
Out-Invert
(feet)
Length
(feet)
Slope
(ft/ft)
n Width
(inches)
Diam/Height
(inches)
Inside-Fill
(inches)
Node
Name
1 P1 1,642.1
5 1,642.00 55.0 0.0027 0.012 0.0 8.0 0.0
2 P2 1,643.15 1,643.00 55.0 0.0027 0.012 0.0 12.0 0.0
Page 48
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 5Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
T
ime span=0.00-40.00 hrs, dt=0.05 hrs, 801 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Run
off Area=18,312 sf 90.12% Impervious Runoff Depth=1.80"S
ubcatchment D1: D1
T
c=10.0 min CN=WQ Runoff=0.91 cfs 0.063 af
Runoff Area=40,724 sf 78.59% Impervious Runoff Depth=1.57"S
ubcatchment D2: D2
T
c=10.0 min CN=WQ Runoff=1.76 cfs 0.122 af
Runoff Area=3,535 sf 39.52% Impervious Runoff Depth=0.79"S
ubcatchment D3: D3
T
c=10.0 min CN=WQ Runoff=0.08 cfs 0.005 af
Runoff Area=5,176 sf 34.78% Impervious Runoff Depth=0.69"S
ubcatchment D4: D4
T
c=10.0 min CN=WQ Runoff=0.10 cfs 0.007 af
Peak Elev=1,642.91' Storage=168 cf Inflow=0.91 cfs 0.063 afP
ond P1:
D
iscarded=0.02 cfs 0.016 af Primary=0.80 cfs 0.047 af Secondary=0.00 cfs 0.000 af Outflow=0.82 cfs 0.063 af
Peak Elev=1,642.79' Storage=3,521 cf Inflow=2.51 cfs 0.169 afP
ond P2:
D
iscarded=0.31 cfs 0.169 af Primary=0.00 cfs 0.000 af Secondary=0.00 cfs 0.000 af Outflow=0.31 cfs 0.169 af
Peak Elev=1,642.04' Storage=21 cf Inflow=0.08 cfs 0.005 afP
ond P3:
D
iscarded=0.04 cfs 0.005 af Primary=0.00 cfs 0.000 af Secondary=0.00 cfs 0.000 af Outflow=0.04 cfs 0.005 af
Peak Elev=1,642.02' Storage=13 cf Inflow=0.10 cfs 0.007 afP
ond P4:
D
iscarded=0.07 cfs 0.007 af Primary=0.00 cfs 0.000 af Outflow=0.07 cfs 0.007 af
Inflow=0.00 cfs 0.000 afL
ink 1L: link
Pr
imary=0.00 cfs 0.000 af
T
otal Runoff Area = 1.555 ac Runoff Volume = 0.197 af Average Runoff Depth = 1.52"
23.68% Pervious = 0.368 ac 76.32% Impervious = 1.187 ac
Page 49
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 6Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D1: D1
R
unoff = 0.91 cfs @ 12.17 hrs, Volume= 0.063 af, Depth= 1.80"
Routed to Pond P1 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 1-Year Rainfall=2.22"
Area (sf) CN Description
* 4
,776 98 parking lot
* 11,687 98 building
* 40 98 basin
1,809 39 >75% Grass cover, Good, HSG A
1
8,312 Weighted Average
1,809 9.88% Pervious Area
16,503 90.12% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, minimum
S
ubcatchment D1: D1
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
M
SE 24-hr 4
1-Year Rainfall=2.22"
Runoff Area=18,312 sf
Runoff Volume=0.063 af
Runoff Depth=1.80"
Tc=10.0 min
CN=WQ
0.91
cfs
Page 50
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 7Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D2: D2
R
unoff = 1.76 cfs @ 12.17 hrs, Volume= 0.122 af, Depth= 1.57"
Routed to Pond P2 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 1-Year Rainfall=2.22"
Area (sf) CN Description
* 6
30 98 basin
* 16,865 98 parking lot
8,720 39 >75% Grass cover, Good, HSG A
* 14,509 98 building
4
0,724 Weighted Average
8,720 21.41% Pervious Area
32,004 78.59% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, minimum
S
ubcatchment D2: D2
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)1
0
M
SE 24-hr 4
1-Year Rainfall=2.22"
Runoff Area=40,724 sf
Runoff Volume=0.122 af
Runoff Depth=1.57"
Tc=10.0 min
CN=WQ
1.76
cfs
Page 51
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 8Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D3: D3
R
unoff = 0.08 cfs @ 12.17 hrs, Volume= 0.005 af, Depth= 0.79"
Routed to Pond P3 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 1-Year Rainfall=2.22"
Area (sf) CN Description
* 3
03 98 parking lot
* 924 98 building
* 170 98 basin
2,138 39 >75% Grass cover, Good, HSG A
3
,535 Weighted Average
2,138 60.48% Pervious Area
1,397 39.52% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, minimum
S
ubcatchment D3: D3
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.085
0.08
0.075
0.07
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
MSE
24-hr 4
1-Year Rainfall=2.22"
Runoff Area=3,535 sf
Runoff Volume=0.005 af
Runoff Depth=0.79"
Tc=10.0 min
CN=WQ
0.08
cfs
Page 52
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 9Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D4: D4
R
unoff = 0.10 cfs @ 12.17 hrs, Volume= 0.007 af, Depth= 0.69"
Routed to Pond P4 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 1-Year Rainfall=2.22"
Area (sf) CN Description
* 1
,500 98 building
* 300 98 basin
3,376 39 >75% Grass cover, Good, HSG A
5
,176 Weighted Average
3,376 65.22% Pervious Area
1,800 34.78% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, miminum
S
ubcatchment D4: D4
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.11
0.105
0.1
0.095
0.09
0.085
0.08
0.075
0.07
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
M
SE 24-hr 4
1-Year Rainfall=2.22"
Runoff Area=5,176 sf
Runoff Volume=0.007 af
Runoff Depth=0.69"
Tc=10.0 min
CN=WQ
0.10
cfs
Page 53
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 10Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P1:
In
flow Area = 0.420 ac, 90.12% Impervious, Inflow Depth = 1.80" for 1-Year event
Inflow = 0.91 cfs @ 12.17 hrs, Volume= 0.063 af
Outflow = 0.82 cfs @ 12.21 hrs, Volume= 0.063 af, Atten= 9%, Lag= 2.7 min
Discarded = 0.02 cfs @ 12.21 hrs, Volume= 0.016 af
Primary = 0.80 cfs @ 12.21 hrs, Volume= 0.047 af
Routed to Pond P2 :
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 1L : link
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,642.91' @ 12.21 hrs Surf.Area= 285 sf Storage= 168 cf
Plug-Flow detention time= 20.2 min calculated for 0.063 af (100% of inflow)
Center-of-Mass det. time= 20.4 min ( 785.4 - 765.0 )
Volume Invert Avail.Storage Storage Description
#
1 1,641.00' 11,161 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,641.00 1 0 0
1,642.00 40 21 21
1,643.00 310 175 196
1,644.00 810 560 756
1,645.00 20,000 10,405 11,161
Device Routing Invert Outlet Devices
#
1 Secondary 1,644.00' 5.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,641.00' 3.600 in/hr Exfiltration over Surface area
#3 Primary 1,642.15' 8.0" Round Culvert
L= 55.0' RCP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 1,642.15' / 1,642.00' S= 0.0027 '/' Cc= 0.900
n= 0.012, Flow Area= 0.35 sf
Discarded OutFlow Max=0.02 cfs @ 12.21 hrs HW=1,642.90' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.02 cfs)
P
rimary OutFlow Max=0.79 cfs @ 12.21 hrs HW=1,642.90' TW=1,642.47' (Dynamic Tailwater)
3=Culvert (Barrel Controls 0.79 cfs @ 2.51 fps)
S
econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,641.00' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 54
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 11Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P1:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
Se
condary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
In
flow Area=0.420 ac
Peak Elev=1,642.91'
Storage=168 cf
0.91
cfs
0.82
cfs
0.02
cfs
0.80
cfs
0.00
cfs
Page 55
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 12Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P2:
[8
7] Warning: Oscillations may require smaller dt or Finer Routing (severity=24)
Inflow Area = 1.355 ac, 82.17% Impervious, Inflow Depth = 1.50" for 1-Year event
Inflow = 2.51 cfs @ 12.18 hrs, Volume= 0.169 af
Outflow = 0.31 cfs @ 12.71 hrs, Volume= 0.169 af, Atten= 88%, Lag= 32.0 min
Discarded = 0.31 cfs @ 12.71 hrs, Volume= 0.169 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 1L : link
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Pond P3 :
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,642.79' @ 12.71 hrs Surf.Area= 3,738 sf Storage= 3,521 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 122.9 min ( 884.7 - 761.8 )
Volume Invert Avail.Storage Storage Description
#
1 1,641.00' 22,530 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,641.00 500 0 0
1,642.00 1,990 1,245 1,245
1,643.00 4,190 3,090 4,335
1,644.00 6,100 5,145 9,480
1,645.00 20,000 13,050 22,530
Device Routing Invert Outlet Devices
#
1 Primary 1,643.50' 10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,641.00' 3.600 in/hr Exfiltration over Surface area
#3 Secondary 1,643.15' 12.0" Round Culvert
L= 55.0' RCP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 1,643.15' / 1,643.00' S= 0.0027 '/' Cc= 0.900
n= 0.012, Flow Area= 0.79 sf
Discarded OutFlow Max=0.31 cfs @ 12.71 hrs HW=1,642.79' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.31 cfs)
P
rimary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,641.00' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
S
econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,641.00' TW=1,642.00' (Dynamic Tailwater)
3=Culvert ( Controls 0.00 cfs)
Page 56
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 13Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P2:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
Se
condary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
2
1
0
In
flow Area=1.355 ac
Peak Elev=1,642.79'
Storage=3,521 cf
2.51
cfs
0.31
cfs 0.31
cfs
0.00
cfs 0.00
cfs
Page 57
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 14Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P3:
[8
7] Warning: Oscillations may require smaller dt or Finer Routing (severity=113)
Inflow Area = 0.081 ac, 39.52% Impervious, Inflow Depth = 0.79" for 1-Year event
Inflow = 0.08 cfs @ 12.17 hrs, Volume= 0.005 af
Outflow = 0.04 cfs @ 12.31 hrs, Volume= 0.005 af, Atten= 47%, Lag= 8.5 min
Discarded = 0.04 cfs @ 12.31 hrs, Volume= 0.005 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Pond P4 :
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 1L : link
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,642.04' @ 12.31 hrs Surf.Area= 488 sf Storage= 21 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 2.2 min ( 767.2 - 765.0 )
Volume Invert Avail.Storage Storage Description
#
1 1,642.00' 3,820 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,642.00 460 0 0
1,643.00 1,090 775 775
1,644.00 5,000 3,045 3,820
Device Routing Invert Outlet Devices
#
1 Secondary 1,643.50' 10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,642.00' 3.600 in/hr Exfiltration over Surface area
#3 Primary 1,643.00' 5.0' long + 4.0 '/' SideZ x 10.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60
Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64
Discarded OutFlow Max=0.04 cfs @ 12.31 hrs HW=1,642.04' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.04 cfs)
P
rimary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,642.00' TW=1,642.00' (Dynamic Tailwater)
3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
S
econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,642.00' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 58
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 15Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P3:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
Se
condary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.085
0.08
0.075
0.07
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
I
nflow Area=0.081 ac
Peak Elev=1,642.04'
Storage=21 cf
0.08
cfs
0.04
cfs 0.04
cfs
0.00
cfs 0.00
cfs
Page 59
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 16Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P4:
[8
7] Warning: Oscillations may require smaller dt or Finer Routing (severity=113)
Inflow Area = 0.200 ac, 36.70% Impervious, Inflow Depth = 0.41" for 1-Year event
Inflow = 0.10 cfs @ 12.17 hrs, Volume= 0.007 af
Outflow = 0.07 cfs @ 12.26 hrs, Volume= 0.007 af, Atten= 31%, Lag= 5.7 min
Discarded = 0.07 cfs @ 12.26 hrs, Volume= 0.007 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 1L : link
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,642.02' @ 12.26 hrs Surf.Area= 818 sf Storage= 13 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 0.7 min ( 765.7 - 765.0 )
Volume Invert Avail.Storage Storage Description
#
1 1,642.00' 4,800 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,642.00 800 0 0
1,643.00 1,900 1,350 1,350
1,644.00 5,000 3,450 4,800
Device Routing Invert Outlet Devices
#
1 Primary 1,643.50' 10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,642.00' 3.600 in/hr Exfiltration over Surface area
Discarded OutFlow Max=0.07 cfs @ 12.26 hrs HW=1,642.02' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.07 cfs)
P
rimary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,642.00' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 60
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 17Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P4:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.11
0.105
0.1
0.095
0.09
0.085
0.08
0.075
0.07
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
In
flow Area=0.200 ac
Peak Elev=1,642.02'
Storage=13 cf
0.10
cfs
0.07
cfs 0.07
cfs
0.00
cfs
Page 61
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 18Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Link 1L: link
In
flow Area = 1.555 ac, 76.32% Impervious, Inflow Depth = 0.00" for 1-Year event
Inflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
L
ink 1L: link
I
nflow
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
In
flow Area=1.555 ac
0.00
cfs 0.00
cfs
Page 62
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 19Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
T
ime span=0.00-40.00 hrs, dt=0.05 hrs, 801 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Run
off Area=18,312 sf 90.12% Impervious Runoff Depth=2.10"S
ubcatchment D1: D1
T
c=10.0 min CN=WQ Runoff=1.05 cfs 0.074 af
Runoff Area=40,724 sf 78.59% Impervious Runoff Depth=1.83"S
ubcatchment D2: D2
T
c=10.0 min CN=WQ Runoff=2.04 cfs 0.143 af
Runoff Area=3,535 sf 39.52% Impervious Runoff Depth=0.92"S
ubcatchment D3: D3
T
c=10.0 min CN=WQ Runoff=0.09 cfs 0.006 af
Runoff Area=5,176 sf 34.78% Impervious Runoff Depth=0.81"S
ubcatchment D4: D4
T
c=10.0 min CN=WQ Runoff=0.11 cfs 0.008 af
Peak Elev=1,643.02' Storage=201 cf Inflow=1.05 cfs 0.074 afP
ond P1:
D
iscarded=0.03 cfs 0.018 af Primary=0.88 cfs 0.056 af Secondary=0.00 cfs 0.000 af Outflow=0.91 cfs 0.074 af
Peak Elev=1,642.96' Storage=4,176 cf Inflow=2.87 cfs 0.198 afP
ond P2:
D
iscarded=0.34 cfs 0.199 af Primary=0.00 cfs 0.000 af Secondary=0.00 cfs 0.000 af Outflow=0.34 cfs 0.199 af
Peak Elev=1,642.06' Storage=30 cf Inflow=0.09 cfs 0.006 afP
ond P3:
D
iscarded=0.04 cfs 0.006 af Primary=0.00 cfs 0.000 af Secondary=0.00 cfs 0.000 af Outflow=0.04 cfs 0.006 af
Peak Elev=1,642.03' Storage=23 cf Inflow=0.11 cfs 0.008 afP
ond P4:
D
iscarded=0.07 cfs 0.008 af Primary=0.00 cfs 0.000 af Outflow=0.07 cfs 0.008 af
Inflow=0.00 cfs 0.000 afL
ink 1L: link
Pr
imary=0.00 cfs 0.000 af
T
otal Runoff Area = 1.555 ac Runoff Volume = 0.231 af Average Runoff Depth = 1.78"
23.68% Pervious = 0.368 ac 76.32% Impervious = 1.187 ac
Page 63
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 20Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D1: D1
R
unoff = 1.05 cfs @ 12.17 hrs, Volume= 0.074 af, Depth= 2.10"
Routed to Pond P1 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 2-Year Rainfall=2.56"
Area (sf) CN Description
* 4
,776 98 parking lot
* 11,687 98 building
* 40 98 basin
1,809 39 >75% Grass cover, Good, HSG A
1
8,312 Weighted Average
1,809 9.88% Pervious Area
16,503 90.12% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, minimum
S
ubcatchment D1: D1
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
M
SE 24-hr 4
2-Year Rainfall=2.56"
Runoff Area=18,312 sf
Runoff Volume=0.074 af
Runoff Depth=2.10"
Tc=10.0 min
CN=WQ
1.05
cfs
Page 64
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 21Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D2: D2
R
unoff = 2.04 cfs @ 12.17 hrs, Volume= 0.143 af, Depth= 1.83"
Routed to Pond P2 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 2-Year Rainfall=2.56"
Area (sf) CN Description
* 6
30 98 basin
* 16,865 98 parking lot
8,720 39 >75% Grass cover, Good, HSG A
* 14,509 98 building
4
0,724 Weighted Average
8,720 21.41% Pervious Area
32,004 78.59% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, minimum
S
ubcatchment D2: D2
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
2
1
0
M
SE 24-hr 4
2-Year Rainfall=2.56"
Runoff Area=40,724 sf
Runoff Volume=0.143 af
Runoff Depth=1.83"
Tc=10.0 min
CN=WQ
2.04
cfs
Page 65
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 22Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D3: D3
R
unoff = 0.09 cfs @ 12.17 hrs, Volume= 0.006 af, Depth= 0.92"
Routed to Pond P3 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 2-Year Rainfall=2.56"
Area (sf) CN Description
* 3
03 98 parking lot
* 924 98 building
* 170 98 basin
2,138 39 >75% Grass cover, Good, HSG A
3
,535 Weighted Average
2,138 60.48% Pervious Area
1,397 39.52% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, minimum
S
ubcatchment D3: D3
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.095
0.09
0.085
0.08
0.075
0.07
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
MSE
24-hr 4
2-Year Rainfall=2.56"
Runoff Area=3,535 sf
Runoff Volume=0.006 af
Runoff Depth=0.92"
Tc=10.0 min
CN=WQ
0.09
cfs
Page 66
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 23Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D4: D4
R
unoff = 0.11 cfs @ 12.17 hrs, Volume= 0.008 af, Depth= 0.81"
Routed to Pond P4 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 2-Year Rainfall=2.56"
Area (sf) CN Description
* 1
,500 98 building
* 300 98 basin
3,376 39 >75% Grass cover, Good, HSG A
5
,176 Weighted Average
3,376 65.22% Pervious Area
1,800 34.78% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, miminum
S
ubcatchment D4: D4
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.125
0.12
0.115
0.11
0.105
0.1
0.095
0.09
0.085
0.08
0.075
0.07
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
M
SE 24-hr 4
2-Year Rainfall=2.56"
Runoff Area=5,176 sf
Runoff Volume=0.008 af
Runoff Depth=0.81"
Tc=10.0 min
CN=WQ
0.11
cfs
Page 67
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 24Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P1:
In
flow Area = 0.420 ac, 90.12% Impervious, Inflow Depth = 2.10" for 2-Year event
Inflow = 1.05 cfs @ 12.17 hrs, Volume= 0.074 af
Outflow = 0.91 cfs @ 12.22 hrs, Volume= 0.074 af, Atten= 14%, Lag= 3.3 min
Discarded = 0.03 cfs @ 12.22 hrs, Volume= 0.018 af
Primary = 0.88 cfs @ 12.22 hrs, Volume= 0.056 af
Routed to Pond P2 :
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 1L : link
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,643.02' @ 12.22 hrs Surf.Area= 319 sf Storage= 201 cf
Plug-Flow detention time= 20.9 min calculated for 0.073 af (100% of inflow)
Center-of-Mass det. time= 21.0 min ( 783.0 - 762.0 )
Volume Invert Avail.Storage Storage Description
#
1 1,641.00' 11,161 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,641.00 1 0 0
1,642.00 40 21 21
1,643.00 310 175 196
1,644.00 810 560 756
1,645.00 20,000 10,405 11,161
Device Routing Invert Outlet Devices
#
1 Secondary 1,644.00' 5.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,641.00' 3.600 in/hr Exfiltration over Surface area
#3 Primary 1,642.15' 8.0" Round Culvert
L= 55.0' RCP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 1,642.15' / 1,642.00' S= 0.0027 '/' Cc= 0.900
n= 0.012, Flow Area= 0.35 sf
Discarded OutFlow Max=0.03 cfs @ 12.22 hrs HW=1,643.01' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.03 cfs)
P
rimary OutFlow Max=0.87 cfs @ 12.22 hrs HW=1,643.01' TW=1,642.65' (Dynamic Tailwater)
3=Culvert (Outlet Controls 0.87 cfs @ 2.52 fps)
S
econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,641.00' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 68
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 25Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P1:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
Se
condary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
In
flow Area=0.420 ac
Peak Elev=1,643.02'
Storage=201 cf
1.05
cfs
0.91
cfs
0.03
cfs
0.88
cfs
0.00
cfs
Page 69
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 26Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P2:
[8
7] Warning: Oscillations may require smaller dt or Finer Routing (severity=16)
Inflow Area = 1.355 ac, 82.17% Impervious, Inflow Depth = 1.76" for 2-Year event
Inflow = 2.87 cfs @ 12.18 hrs, Volume= 0.198 af
Outflow = 0.34 cfs @ 12.74 hrs, Volume= 0.199 af, Atten= 88%, Lag= 33.9 min
Discarded = 0.34 cfs @ 12.74 hrs, Volume= 0.199 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 1L : link
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Pond P3 :
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,642.96' @ 12.74 hrs Surf.Area= 4,105 sf Storage= 4,176 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 133.7 min ( 893.6 - 759.9 )
Volume Invert Avail.Storage Storage Description
#
1 1,641.00' 22,530 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,641.00 500 0 0
1,642.00 1,990 1,245 1,245
1,643.00 4,190 3,090 4,335
1,644.00 6,100 5,145 9,480
1,645.00 20,000 13,050 22,530
Device Routing Invert Outlet Devices
#
1 Primary 1,643.50' 10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,641.00' 3.600 in/hr Exfiltration over Surface area
#3 Secondary 1,643.15' 12.0" Round Culvert
L= 55.0' RCP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 1,643.15' / 1,643.00' S= 0.0027 '/' Cc= 0.900
n= 0.012, Flow Area= 0.79 sf
Discarded OutFlow Max=0.34 cfs @ 12.74 hrs HW=1,642.96' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.34 cfs)
P
rimary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,641.00' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
S
econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,641.00' TW=1,642.00' (Dynamic Tailwater)
3=Culvert ( Controls 0.00 cfs)
Page 70
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 27Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P2:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
Se
condary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
3
2
1
0
In
flow Area=1.355 ac
Peak Elev=1,642.96'
Storage=4,176 cf
2.87
cfs
0.34
cfs 0.34
cfs
0.00
cfs 0.00
cfs
Page 71
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 28Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P3:
[8
7] Warning: Oscillations may require smaller dt or Finer Routing (severity=112)
Inflow Area = 0.081 ac, 39.52% Impervious, Inflow Depth = 0.92" for 2-Year event
Inflow = 0.09 cfs @ 12.17 hrs, Volume= 0.006 af
Outflow = 0.04 cfs @ 12.33 hrs, Volume= 0.006 af, Atten= 53%, Lag= 9.8 min
Discarded = 0.04 cfs @ 12.33 hrs, Volume= 0.006 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Pond P4 :
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 1L : link
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,642.06' @ 12.33 hrs Surf.Area= 500 sf Storage= 30 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 3.3 min ( 765.2 - 762.0 )
Volume Invert Avail.Storage Storage Description
#
1 1,642.00' 3,820 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,642.00 460 0 0
1,643.00 1,090 775 775
1,644.00 5,000 3,045 3,820
Device Routing Invert Outlet Devices
#
1 Secondary 1,643.50' 10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,642.00' 3.600 in/hr Exfiltration over Surface area
#3 Primary 1,643.00' 5.0' long + 4.0 '/' SideZ x 10.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60
Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64
Discarded OutFlow Max=0.04 cfs @ 12.33 hrs HW=1,642.06' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.04 cfs)
P
rimary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,642.00' TW=1,642.00' (Dynamic Tailwater)
3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
S
econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,642.00' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 72
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 29Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P3:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
Se
condary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.095
0.09
0.085
0.08
0.075
0.07
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
I
nflow Area=0.081 ac
Peak Elev=1,642.06'
Storage=30 cf
0.09
cfs
0.04
cfs 0.04
cfs
0.00
cfs 0.00
cfs
Page 73
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 30Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P4:
[8
7] Warning: Oscillations may require smaller dt or Finer Routing (severity=114)
Inflow Area = 0.200 ac, 36.70% Impervious, Inflow Depth = 0.48" for 2-Year event
Inflow = 0.11 cfs @ 12.17 hrs, Volume= 0.008 af
Outflow = 0.07 cfs @ 12.29 hrs, Volume= 0.008 af, Atten= 40%, Lag= 7.1 min
Discarded = 0.07 cfs @ 12.29 hrs, Volume= 0.008 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 1L : link
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,642.03' @ 12.29 hrs Surf.Area= 830 sf Storage= 23 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 1.5 min ( 763.4 - 762.0 )
Volume Invert Avail.Storage Storage Description
#
1 1,642.00' 4,800 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,642.00 800 0 0
1,643.00 1,900 1,350 1,350
1,644.00 5,000 3,450 4,800
Device Routing Invert Outlet Devices
#
1 Primary 1,643.50' 10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,642.00' 3.600 in/hr Exfiltration over Surface area
Discarded OutFlow Max=0.07 cfs @ 12.29 hrs HW=1,642.03' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.07 cfs)
P
rimary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,642.00' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 74
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 31Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P4:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.125
0.12
0.115
0.11
0.105
0.1
0.095
0.09
0.085
0.08
0.075
0.07
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
In
flow Area=0.200 ac
Peak Elev=1,642.03'
Storage=23 cf
0.11
cfs
0.07
cfs 0.07
cfs
0.00
cfs
Page 75
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 32Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Link 1L: link
In
flow Area = 1.555 ac, 76.32% Impervious, Inflow Depth = 0.00" for 2-Year event
Inflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
L
ink 1L: link
I
nflow
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
In
flow Area=1.555 ac
0.00
cfs 0.00
cfs
Page 76
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 33Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
T
ime span=0.00-40.00 hrs, dt=0.05 hrs, 801 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Run
off Area=18,312 sf 90.12% Impervious Runoff Depth=3.21"S
ubcatchment D1: D1
T
c=10.0 min CN=WQ Runoff=1.57 cfs 0.112 af
Runoff Area=40,724 sf 78.59% Impervious Runoff Depth=2.80"S
ubcatchment D2: D2
T
c=10.0 min CN=WQ Runoff=3.05 cfs 0.218 af
Runoff Area=3,535 sf 39.52% Impervious Runoff Depth=1.42"S
ubcatchment D3: D3
T
c=10.0 min CN=WQ Runoff=0.13 cfs 0.010 af
Runoff Area=5,176 sf 34.78% Impervious Runoff Depth=1.25"S
ubcatchment D4: D4
T
c=10.0 min CN=WQ Runoff=0.17 cfs 0.012 af
Peak Elev=1,643.52' Storage=425 cf Inflow=1.57 cfs 0.112 afP
ond P1:
D
iscarded=0.05 cfs 0.026 af Primary=1.02 cfs 0.087 af Secondary=0.00 cfs 0.000 af Outflow=1.07 cfs 0.112 af
Peak Elev=1,643.44' Storage=6,364 cf Inflow=4.07 cfs 0.305 afP
ond P2:
D
iscarded=0.42 cfs 0.287 af Primary=0.00 cfs 0.000 af Secondary=0.21 cfs 0.018 af Outflow=0.63 cfs 0.305 af
Peak Elev=1,642.77' Storage=538 cf Inflow=0.23 cfs 0.027 afP
ond P3:
D
iscarded=0.08 cfs 0.027 af Primary=0.00 cfs 0.000 af Secondary=0.00 cfs 0.000 af Outflow=0.08 cfs 0.027 af
Peak Elev=1,642.08' Storage=67 cf Inflow=0.17 cfs 0.012 afP
ond P4:
D
iscarded=0.07 cfs 0.013 af Primary=0.00 cfs 0.000 af Outflow=0.07 cfs 0.013 af
Inflow=0.00 cfs 0.000 afL
ink 1L: link
Pr
imary=0.00 cfs 0.000 af
T
otal Runoff Area = 1.555 ac Runoff Volume = 0.353 af Average Runoff Depth = 2.72"
23.68% Pervious = 0.368 ac 76.32% Impervious = 1.187 ac
Page 77
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 34Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D1: D1
R
unoff = 1.57 cfs @ 12.17 hrs, Volume= 0.112 af, Depth= 3.21"
Routed to Pond P1 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 10-Year Rainfall=3.79"
Area (sf) CN Description
* 4
,776 98 parking lot
* 11,687 98 building
* 40 98 basin
1,809 39 >75% Grass cover, Good, HSG A
1
8,312 Weighted Average
1,809 9.88% Pervious Area
16,503 90.12% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, minimum
S
ubcatchment D1: D1
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
M
SE 24-hr 4
10-Year Rainfall=3.79"
Runoff Area=18,312 sf
Runoff Volume=0.112 af
Runoff Depth=3.21"
Tc=10.0 min
CN=WQ
1.57
cfs
Page 78
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 35Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D2: D2
R
unoff = 3.05 cfs @ 12.17 hrs, Volume= 0.218 af, Depth= 2.80"
Routed to Pond P2 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 10-Year Rainfall=3.79"
Area (sf) CN Description
* 6
30 98 basin
* 16,865 98 parking lot
8,720 39 >75% Grass cover, Good, HSG A
* 14,509 98 building
4
0,724 Weighted Average
8,720 21.41% Pervious Area
32,004 78.59% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, minimum
S
ubcatchment D2: D2
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
3
2
1
0
M
SE 24-hr 4
10-Year Rainfall=3.79"
Runoff Area=40,724 sf
Runoff Volume=0.218 af
Runoff Depth=2.80"
Tc=10.0 min
CN=WQ
3.05
cfs
Page 79
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 36Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D3: D3
R
unoff = 0.13 cfs @ 12.17 hrs, Volume= 0.010 af, Depth= 1.42"
Routed to Pond P3 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 10-Year Rainfall=3.79"
Area (sf) CN Description
* 3
03 98 parking lot
* 924 98 building
* 170 98 basin
2,138 39 >75% Grass cover, Good, HSG A
3
,535 Weighted Average
2,138 60.48% Pervious Area
1,397 39.52% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, minimum
S
ubcatchment D3: D3
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
M
SE 24-hr 4
10-Year Rainfall=3.79"
Runoff Area=3,535 sf
Runoff Volume=0.010 af
Runoff Depth=1.42"
Tc=10.0 min
CN=WQ
0.13
cfs
Page 80
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 37Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D4: D4
R
unoff = 0.17 cfs @ 12.17 hrs, Volume= 0.012 af, Depth= 1.25"
Routed to Pond P4 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 10-Year Rainfall=3.79"
Area (sf) CN Description
* 1
,500 98 building
* 300 98 basin
3,376 39 >75% Grass cover, Good, HSG A
5
,176 Weighted Average
3,376 65.22% Pervious Area
1,800 34.78% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, miminum
S
ubcatchment D4: D4
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.19
0.18
0.17
0.16
0.15
0.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
M
SE 24-hr 4
10-Year Rainfall=3.79"
Runoff Area=5,176 sf
Runoff Volume=0.012 af
Runoff Depth=1.25"
Tc=10.0 min
CN=WQ
0.17
cfs
Page 81
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 38Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P1:
In
flow Area = 0.420 ac, 90.12% Impervious, Inflow Depth = 3.21" for 10-Year event
Inflow = 1.57 cfs @ 12.17 hrs, Volume= 0.112 af
Outflow = 1.07 cfs @ 12.19 hrs, Volume= 0.112 af, Atten= 32%, Lag= 1.4 min
Discarded = 0.05 cfs @ 12.30 hrs, Volume= 0.026 af
Primary = 1.02 cfs @ 12.19 hrs, Volume= 0.087 af
Routed to Pond P2 :
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 1L : link
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,643.52' @ 12.30 hrs Surf.Area= 570 sf Storage= 425 cf
Plug-Flow detention time= 23.6 min calculated for 0.112 af (100% of inflow)
Center-of-Mass det. time= 23.8 min ( 778.7 - 754.9 )
Volume Invert Avail.Storage Storage Description
#
1 1,641.00' 11,161 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,641.00 1 0 0
1,642.00 40 21 21
1,643.00 310 175 196
1,644.00 810 560 756
1,645.00 20,000 10,405 11,161
Device Routing Invert Outlet Devices
#
1 Secondary 1,644.00' 5.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,641.00' 3.600 in/hr Exfiltration over Surface area
#3 Primary 1,642.15' 8.0" Round Culvert
L= 55.0' RCP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 1,642.15' / 1,642.00' S= 0.0027 '/' Cc= 0.900
n= 0.012, Flow Area= 0.35 sf
Discarded OutFlow Max=0.05 cfs @ 12.30 hrs HW=1,643.52' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.05 cfs)
P
rimary OutFlow Max=0.85 cfs @ 12.19 hrs HW=1,643.36' TW=1,642.99' (Dynamic Tailwater)
3=Culvert (Outlet Controls 0.85 cfs @ 2.43 fps)
S
econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,641.00' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 82
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 39Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P1:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
Se
condary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
In
flow Area=0.420 ac
Peak Elev=1,643.52'
Storage=425 cf
1.57
cfs
1.07
cfs
0.05
cfs
1.02
cfs
0.00
cfs
Page 83
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 40Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P2:
In
flow Area = 1.355 ac, 82.17% Impervious, Inflow Depth = 2.70" for 10-Year event
Inflow = 4.07 cfs @ 12.17 hrs, Volume= 0.305 af
Outflow = 0.63 cfs @ 12.65 hrs, Volume= 0.305 af, Atten= 84%, Lag= 28.5 min
Discarded = 0.42 cfs @ 12.65 hrs, Volume= 0.287 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 1L : link
Secondary = 0.21 cfs @ 12.65 hrs, Volume= 0.018 af
Routed to Pond P3 :
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,643.44' @ 12.65 hrs Surf.Area= 5,031 sf Storage= 6,364 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 152.6 min ( 908.0 - 755.4 )
Volume Invert Avail.Storage Storage Description
#
1 1,641.00' 22,530 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,641.00 500 0 0
1,642.00 1,990 1,245 1,245
1,643.00 4,190 3,090 4,335
1,644.00 6,100 5,145 9,480
1,645.00 20,000 13,050 22,530
Device Routing Invert Outlet Devices
#
1 Primary 1,643.50' 10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,641.00' 3.600 in/hr Exfiltration over Surface area
#3 Secondary 1,643.15' 12.0" Round Culvert
L= 55.0' RCP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 1,643.15' / 1,643.00' S= 0.0027 '/' Cc= 0.900
n= 0.012, Flow Area= 0.79 sf
Discarded OutFlow Max=0.42 cfs @ 12.65 hrs HW=1,643.44' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.42 cfs)
P
rimary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,641.00' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
S
econdary OutFlow Max=0.21 cfs @ 12.65 hrs HW=1,643.44' TW=1,642.41' (Dynamic Tailwater)
3=Culvert (Barrel Controls 0.21 cfs @ 1.69 fps)
Page 84
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 41Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P2:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
Se
condary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
4
3
2
1
0
In
flow Area=1.355 ac
Peak Elev=1,643.44'
Storage=6,364 cf
4.07
cfs
0.63
cfs
0.42
cfs
0.00
cfs
0.21
cfs
Page 85
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 42Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P3:
[8
7] Warning: Oscillations may require smaller dt or Finer Routing (severity=72)
Inflow Area = 0.081 ac, 39.52% Impervious, Inflow Depth = 4.04" for 10-Year event
Inflow = 0.23 cfs @ 12.61 hrs, Volume= 0.027 af
Outflow = 0.08 cfs @ 13.60 hrs, Volume= 0.027 af, Atten= 66%, Lag= 59.1 min
Discarded = 0.08 cfs @ 13.60 hrs, Volume= 0.027 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Pond P4 :
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 1L : link
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,642.77' @ 13.60 hrs Surf.Area= 943 sf Storage= 538 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 64.8 min ( 836.6 - 771.8 )
Volume Invert Avail.Storage Storage Description
#
1 1,642.00' 3,820 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,642.00 460 0 0
1,643.00 1,090 775 775
1,644.00 5,000 3,045 3,820
Device Routing Invert Outlet Devices
#
1 Secondary 1,643.50' 10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,642.00' 3.600 in/hr Exfiltration over Surface area
#3 Primary 1,643.00' 5.0' long + 4.0 '/' SideZ x 10.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60
Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64
Discarded OutFlow Max=0.08 cfs @ 13.60 hrs HW=1,642.77' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.08 cfs)
P
rimary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,642.00' TW=1,642.00' (Dynamic Tailwater)
3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
S
econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,642.00' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 86
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 43Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P3:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
Se
condary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.26
0.25
0.24
0.23
0.22
0.21
0.2
0.19
0.18
0.17
0.16
0.15
0.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
I
nflow Area=0.081 ac
Peak Elev=1,642.77'
Storage=538 cf
0.23
cfs
0.08
cfs 0.08
cfs
0.00
cfs 0.00
cfs
Page 87
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 44Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P4:
[8
7] Warning: Oscillations may require smaller dt or Finer Routing (severity=111)
Inflow Area = 0.200 ac, 36.70% Impervious, Inflow Depth = 0.75" for 10-Year event
Inflow = 0.17 cfs @ 12.17 hrs, Volume= 0.012 af
Outflow = 0.07 cfs @ 12.35 hrs, Volume= 0.013 af, Atten= 57%, Lag= 10.8 min
Discarded = 0.07 cfs @ 12.35 hrs, Volume= 0.013 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 1L : link
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,642.08' @ 12.35 hrs Surf.Area= 888 sf Storage= 67 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 4.1 min ( 763.9 - 759.8 )
Volume Invert Avail.Storage Storage Description
#
1 1,642.00' 4,800 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,642.00 800 0 0
1,643.00 1,900 1,350 1,350
1,644.00 5,000 3,450 4,800
Device Routing Invert Outlet Devices
#
1 Primary 1,643.50' 10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,642.00' 3.600 in/hr Exfiltration over Surface area
Discarded OutFlow Max=0.07 cfs @ 12.35 hrs HW=1,642.08' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.07 cfs)
P
rimary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,642.00' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 88
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 45Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P4:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.19
0.18
0.17
0.16
0.15
0.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
In
flow Area=0.200 ac
Peak Elev=1,642.08'
Storage=67 cf
0.17
cfs
0.07
cfs 0.07
cfs
0.00
cfs
Page 89
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 46Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Link 1L: link
In
flow Area = 1.555 ac, 76.32% Impervious, Inflow Depth = 0.00" for 10-Year event
Inflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
L
ink 1L: link
I
nflow
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
In
flow Area=1.555 ac
0.00
cfs 0.00
cfs
Page 90
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 47Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
T
ime span=0.00-40.00 hrs, dt=0.05 hrs, 801 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Run
off Area=18,312 sf 90.12% Impervious Runoff Depth=5.64"S
ubcatchment D1: D1
T
c=10.0 min CN=WQ Runoff=2.69 cfs 0.197 af
Runoff Area=40,724 sf 78.59% Impervious Runoff Depth=4.99"S
ubcatchment D2: D2
T
c=10.0 min CN=WQ Runoff=5.25 cfs 0.389 af
Runoff Area=3,535 sf 39.52% Impervious Runoff Depth=2.79"S
ubcatchment D3: D3
T
c=10.0 min CN=WQ Runoff=0.24 cfs 0.019 af
Runoff Area=5,176 sf 34.78% Impervious Runoff Depth=2.53"S
ubcatchment D4: D4
T
c=10.0 min CN=WQ Runoff=0.31 cfs 0.025 af
Peak Elev=1,644.13' Storage=1,035 cf Inflow=2.69 cfs 0.197 afP
ond P1:
D
iscarded=0.28 cfs 0.037 af Primary=1.14 cfs 0.149 af Secondary=0.71 cfs 0.011 af Outflow=1.94 cfs 0.197 af
Peak Elev=1,643.73' Storage=7,916 cf Inflow=6.38 cfs 0.538 afP
ond P2:
D
iscarded=0.47 cfs 0.380 af Primary=3.23 cfs 0.091 af Secondary=0.81 cfs 0.066 af Outflow=4.50 cfs 0.538 af
Peak Elev=1,643.11' Storage=921 cf Inflow=0.98 cfs 0.085 afP
ond P3:
D
iscarded=0.13 cfs 0.049 af Primary=0.50 cfs 0.036 af Secondary=0.00 cfs 0.000 af Outflow=0.63 cfs 0.085 af
Peak Elev=1,642.92' Storage=1,196 cf Inflow=0.58 cfs 0.061 afP
ond P4:
D
iscarded=0.15 cfs 0.061 af Primary=0.00 cfs 0.000 af Outflow=0.15 cfs 0.061 af
Inflow=3.94 cfs 0.103 afL
ink 1L: link
Pr
imary=3.94 cfs 0.103 af
T
otal Runoff Area = 1.555 ac Runoff Volume = 0.630 af Average Runoff Depth = 4.86"
23.68% Pervious = 0.368 ac 76.32% Impervious = 1.187 ac
Page 91
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 48Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D1: D1
R
unoff = 2.69 cfs @ 12.17 hrs, Volume= 0.197 af, Depth= 5.64"
Routed to Pond P1 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 100-Year Rainfall=6.43"
Area (sf) CN Description
* 4
,776 98 parking lot
* 11,687 98 building
* 40 98 basin
1,809 39 >75% Grass cover, Good, HSG A
1
8,312 Weighted Average
1,809 9.88% Pervious Area
16,503 90.12% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, minimum
S
ubcatchment D1: D1
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
3
2
1
0
M
SE 24-hr 4
100-Year Rainfall=6.43"
Runoff Area=18,312 sf
Runoff Volume=0.197 af
Runoff Depth=5.64"
Tc=10.0 min
CN=WQ
2.69
cfs
Page 92
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 49Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D2: D2
R
unoff = 5.25 cfs @ 12.17 hrs, Volume= 0.389 af, Depth= 4.99"
Routed to Pond P2 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 100-Year Rainfall=6.43"
Area (sf) CN Description
* 6
30 98 basin
* 16,865 98 parking lot
8,720 39 >75% Grass cover, Good, HSG A
* 14,509 98 building
4
0,724 Weighted Average
8,720 21.41% Pervious Area
32,004 78.59% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, minimum
S
ubcatchment D2: D2
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
5
4
3
2
1
0
M
SE 24-hr 4
100-Year Rainfall=6.43"
Runoff Area=40,724 sf
Runoff Volume=0.389 af
Runoff Depth=4.99"
Tc=10.0 min
CN=WQ
5.25
cfs
Page 93
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 50Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D3: D3
R
unoff = 0.24 cfs @ 12.18 hrs, Volume= 0.019 af, Depth= 2.79"
Routed to Pond P3 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 100-Year Rainfall=6.43"
Area (sf) CN Description
* 3
03 98 parking lot
* 924 98 building
* 170 98 basin
2,138 39 >75% Grass cover, Good, HSG A
3
,535 Weighted Average
2,138 60.48% Pervious Area
1,397 39.52% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, minimum
S
ubcatchment D3: D3
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.26
0.25
0.24
0.23
0.22
0.21
0.2
0.19
0.18
0.17
0.16
0.15
0.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
M
SE 24-hr 4
100-Year Rainfall=6.43"
Runoff Area=3,535 sf
Runoff Volume=0.019 af
Runoff Depth=2.79"
Tc=10.0 min
CN=WQ
0.24
cfs
Page 94
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 51Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D4: D4
R
unoff = 0.31 cfs @ 12.18 hrs, Volume= 0.025 af, Depth= 2.53"
Routed to Pond P4 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 100-Year Rainfall=6.43"
Area (sf) CN Description
* 1
,500 98 building
* 300 98 basin
3,376 39 >75% Grass cover, Good, HSG A
5
,176 Weighted Average
3,376 65.22% Pervious Area
1,800 34.78% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, miminum
S
ubcatchment D4: D4
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.34
0.32
0.3
0.28
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
M
SE 24-hr 4
100-Year Rainfall=6.43"
Runoff Area=5,176 sf
Runoff Volume=0.025 af
Runoff Depth=2.53"
Tc=10.0 min
CN=WQ
0.31
cfs
Page 95
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 52Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P1:
In
flow Area = 0.420 ac, 90.12% Impervious, Inflow Depth = 5.64" for 100-Year event
Inflow = 2.69 cfs @ 12.17 hrs, Volume= 0.197 af
Outflow = 1.94 cfs @ 12.25 hrs, Volume= 0.197 af, Atten= 28%, Lag= 4.7 min
Discarded = 0.28 cfs @ 12.26 hrs, Volume= 0.037 af
Primary = 1.14 cfs @ 12.16 hrs, Volume= 0.149 af
Routed to Pond P2 :
Secondary = 0.71 cfs @ 12.26 hrs, Volume= 0.011 af
Routed to Link 1L : link
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,644.13' @ 12.26 hrs Surf.Area= 3,373 sf Storage= 1,035 cf
Plug-Flow detention time= 19.5 min calculated for 0.197 af (100% of inflow)
Center-of-Mass det. time= 19.7 min ( 768.1 - 748.5 )
Volume Invert Avail.Storage Storage Description
#
1 1,641.00' 11,161 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,641.00 1 0 0
1,642.00 40 21 21
1,643.00 310 175 196
1,644.00 810 560 756
1,645.00 20,000 10,405 11,161
Device Routing Invert Outlet Devices
#
1 Secondary 1,644.00' 5.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,641.00' 3.600 in/hr Exfiltration over Surface area
#3 Primary 1,642.15' 8.0" Round Culvert
L= 55.0' RCP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 1,642.15' / 1,642.00' S= 0.0027 '/' Cc= 0.900
n= 0.012, Flow Area= 0.35 sf
Discarded OutFlow Max=0.28 cfs @ 12.26 hrs HW=1,644.13' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.28 cfs)
P
rimary OutFlow Max=0.97 cfs @ 12.16 hrs HW=1,644.02' TW=1,643.54' (Dynamic Tailwater)
3=Culvert (Outlet Controls 0.97 cfs @ 2.77 fps)
S
econdary OutFlow Max=0.69 cfs @ 12.26 hrs HW=1,644.13' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir (Weir Controls 0.69 cfs @ 0.95 fps)
Page 96
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 53Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P1:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
Se
condary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
3
2
1
0
In
flow Area=0.420 ac
Peak Elev=1,644.13'
Storage=1,035 cf
2.69
cfs
1.94
cfs
0.28
cfs
1.14
cfs
0.71
cfs
Page 97
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 54Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P2:
In
flow Area = 1.355 ac, 82.17% Impervious, Inflow Depth = 4.76" for 100-Year event
Inflow = 6.38 cfs @ 12.17 hrs, Volume= 0.538 af
Outflow = 4.50 cfs @ 12.27 hrs, Volume= 0.538 af, Atten= 29%, Lag= 6.4 min
Discarded = 0.47 cfs @ 12.27 hrs, Volume= 0.380 af
Primary = 3.23 cfs @ 12.27 hrs, Volume= 0.091 af
Routed to Link 1L : link
Secondary = 0.81 cfs @ 12.27 hrs, Volume= 0.066 af
Routed to Pond P3 :
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,643.73' @ 12.27 hrs Surf.Area= 5,589 sf Storage= 7,916 cf
Plug-Flow detention time= 123.1 min calculated for 0.537 af (100% of inflow)
Center-of-Mass det. time= 123.2 min ( 874.9 - 751.7 )
Volume Invert Avail.Storage Storage Description
#
1 1,641.00' 22,530 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,641.00 500 0 0
1,642.00 1,990 1,245 1,245
1,643.00 4,190 3,090 4,335
1,644.00 6,100 5,145 9,480
1,645.00 20,000 13,050 22,530
Device Routing Invert Outlet Devices
#
1 Primary 1,643.50' 10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,641.00' 3.600 in/hr Exfiltration over Surface area
#3 Secondary 1,643.15' 12.0" Round Culvert
L= 55.0' RCP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 1,643.15' / 1,643.00' S= 0.0027 '/' Cc= 0.900
n= 0.012, Flow Area= 0.79 sf
Discarded OutFlow Max=0.46 cfs @ 12.27 hrs HW=1,643.73' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.46 cfs)
P
rimary OutFlow Max=3.08 cfs @ 12.27 hrs HW=1,643.73' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir (Weir Controls 3.08 cfs @ 1.26 fps)
S
econdary OutFlow Max=0.79 cfs @ 12.27 hrs HW=1,643.73' TW=1,642.71' (Dynamic Tailwater)
3=Culvert (Barrel Controls 0.79 cfs @ 2.44 fps)
Page 98
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 55Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P2:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
Se
condary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
7
6
5
4
3
2
1
0
In
flow Area=1.355 ac
Peak Elev=1,643.73'
Storage=7,916 cf
6.38
cfs
4.50
cfs
0.47
cfs
3.23
cfs
0.81
cfs
Page 99
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 56Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P3:
[8
7] Warning: Oscillations may require smaller dt or Finer Routing (severity=49)
Inflow Area = 0.081 ac, 39.52% Impervious, Inflow Depth = 12.59" for 100-Year event
Inflow = 0.98 cfs @ 12.26 hrs, Volume= 0.085 af
Outflow = 0.63 cfs @ 12.55 hrs, Volume= 0.085 af, Atten= 36%, Lag= 17.2 min
Discarded = 0.13 cfs @ 12.55 hrs, Volume= 0.049 af
Primary = 0.50 cfs @ 12.55 hrs, Volume= 0.036 af
Routed to Pond P4 :
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 1L : link
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,643.11' @ 12.55 hrs Surf.Area= 1,527 sf Storage= 921 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 54.1 min ( 829.6 - 775.5 )
Volume Invert Avail.Storage Storage Description
#
1 1,642.00' 3,820 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,642.00 460 0 0
1,643.00 1,090 775 775
1,644.00 5,000 3,045 3,820
Device Routing Invert Outlet Devices
#
1 Secondary 1,643.50' 10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,642.00' 3.600 in/hr Exfiltration over Surface area
#3 Primary 1,643.00' 5.0' long + 4.0 '/' SideZ x 10.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60
Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64
Discarded OutFlow Max=0.13 cfs @ 12.55 hrs HW=1,643.11' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.13 cfs)
P
rimary OutFlow Max=0.50 cfs @ 12.55 hrs HW=1,643.11' TW=1,642.42' (Dynamic Tailwater)
3=Broad-Crested Rectangular Weir (Weir Controls 0.50 cfs @ 0.82 fps)
S
econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,642.00' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 100
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 57Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P3:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
Se
condary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
In
flow Area=0.081 ac
Peak Elev=1,643.11'
Storage=921 cf
0.98
cfs
0.63
cfs
0.13
cfs
0.50
cfs
0.00
cfs
Page 101
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 58Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P4:
[8
7] Warning: Oscillations may require smaller dt or Finer Routing (severity=65)
Inflow Area = 0.200 ac, 36.70% Impervious, Inflow Depth = 3.65" for 100-Year event
Inflow = 0.58 cfs @ 12.53 hrs, Volume= 0.061 af
Outflow = 0.15 cfs @ 13.73 hrs, Volume= 0.061 af, Atten= 74%, Lag= 72.3 min
Discarded = 0.15 cfs @ 13.73 hrs, Volume= 0.061 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 1L : link
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,642.92' @ 13.73 hrs Surf.Area= 1,809 sf Storage= 1,196 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 76.0 min ( 853.9 - 777.9 )
Volume Invert Avail.Storage Storage Description
#
1 1,642.00' 4,800 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,642.00 800 0 0
1,643.00 1,900 1,350 1,350
1,644.00 5,000 3,450 4,800
Device Routing Invert Outlet Devices
#
1 Primary 1,643.50' 10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,642.00' 3.600 in/hr Exfiltration over Surface area
Discarded OutFlow Max=0.15 cfs @ 13.73 hrs HW=1,642.92' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.15 cfs)
P
rimary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,642.00' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 102
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 59Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P4:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.6
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
In
flow Area=0.200 ac
Peak Elev=1,642.92'
Storage=1,196 cf
0.58
cfs
0.15
cfs 0.15
cfs
0.00
cfs
Page 103
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 60Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Link 1L: link
In
flow Area = 1.555 ac, 76.32% Impervious, Inflow Depth = 0.79" for 100-Year event
Inflow = 3.94 cfs @ 12.27 hrs, Volume= 0.103 af
Primary = 3.94 cfs @ 12.27 hrs, Volume= 0.103 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
L
ink 1L: link
I
nflow
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
4
3
2
1
0
In
flow Area=1.555 ac
3.94
cfs 3.94
cfs
Page 104
T
able of Contents2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
T
ABLE OF CONTENTS
Project Reports
1
Routing Diagram
2 Rainfall Events Listing
3 Area Listing (all nodes)
4 Pipe Listing (all nodes)
1-Year Event
5
Node Listing
6 Subcat D1: D1
7 Subcat D2: D2
8 Subcat D3: D3
9 Subcat D4: D4
10 Pond P1:
12 Pond P2:
14 Pond P3:
16 Pond P4:
18 Link 1L: link
2-Year Event
1
9 Node Listing
20 Subcat D1: D1
21 Subcat D2: D2
22 Subcat D3: D3
23 Subcat D4: D4
24 Pond P1:
26 Pond P2:
28 Pond P3:
30 Pond P4:
32 Link 1L: link
10-Year Event
3
3 Node Listing
34 Subcat D1: D1
35 Subcat D2: D2
36 Subcat D3: D3
37 Subcat D4: D4
38 Pond P1:
40 Pond P2:
42 Pond P3:
44 Pond P4:
46 Link 1L: link
100-Year Event
4
7 Node Listing
48 Subcat D1: D1
49 Subcat D2: D2
Page 105
T
able of Contents2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
5
0 Subcat D3: D3
51 Subcat D4: D4
52 Pond P1:
54 Pond P2:
56 Pond P3:
58 Pond P4:
60 Link 1L: link
Page 106
1S
Runo
ff
D
5
D5
E
1
existi
ng
P
5 2L
of
fsite runoff
4L
no
rth
R
outing Diagram for 26-0159 south
Prepared by Vreeland Associates, Printed 5/28/2026
Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Subcat Rea
ch Pond L
ink
Page 107
2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 2Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
R
ainfall Events Listing
Event# Event
Nam
e
Storm Type Curve Mode Duration
(hours)
B/B Depth
(inches)
AMC
1 1-
Year MSE 24-hr 4 Default 24.00 1 2.22 2
2 2-Year MSE 24-hr 4 Default 24.00 1 2.56 2
3 10-Year MSE 24-hr 4 Default 24.00 1 3.79 2
4 100-Year MSE 24-hr 4 Default 24.00 1 6.43 2
Page 108
2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 3Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
A
rea Listing (all nodes)
Are
a
(acres)
CN Description
(subcatchment-numbers)
3.277 39 >75%
Grass cover, Good, HSG A (1S, D5, E1)
0.026 98 basin (D5)
0.513 98 building (D5)
0.331 98 pavement (D5)
4.147 51 TOTAL AREA
Page 109
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 4Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
T
ime span=0.00-40.00 hrs, dt=0.05 hrs, 801 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Run
off Area=7,842 sf 0.00% Impervious Runoff Depth=0.00"S
ubcatchment 1S: Runoff
T
c=10.0 min CN=39 Runoff=0.00 cfs 0.000 af
Runoff Area=42,461 sf 89.28% Impervious Runoff Depth=1.78"S
ubcatchment D5: D5
T
c=6.0 min CN=WQ Runoff=2.39 cfs 0.145 af
Runoff Area=2.992 ac 0.00% Impervious Runoff Depth=0.00"S
ubcatchment E1: existing
T
c=10.0 min CN=39 Runoff=0.00 cfs 0.000 af
Peak Elev=1,643.52' Storage=2,764 cf Inflow=2.39 cfs 0.145 afP
ond P5:
D
iscarded=0.21 cfs 0.145 af Primary=0.00 cfs 0.000 af Outflow=0.21 cfs 0.145 af
Inflow=0.00 cfs 0.000 afL
ink 2L: offsite runoff
Pr
imary=0.00 cfs 0.000 af
1-Year Inflow Imported from 26-0159 north~Link 1L.hce Inflow=0.00 cfs 0.000 afL
ink 4L: north
Are
a= 1.555 ac 76.32% Imperv. Primary=0.00 cfs 0.000 af
T
otal Runoff Area = 4.147 ac Runoff Volume = 0.145 af Average Runoff Depth = 0.42"
79.01% Pervious = 3.277 ac 20.99% Impervious = 0.870 ac
Page 110
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 5Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment 1S: Runoff
[4
5] Hint: Runoff=Zero
Runoff = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Depth= 0.00"
Routed to Link 2L : offsite runoff
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 1-Year Rainfall=2.22"
Area (sf) CN Description
7
,842 39 >75% Grass cover, Good, HSG A
7
,842 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, min
S
ubcatchment 1S: Runoff
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
M
SE 24-hr 4
1-Year Rainfall=2.22"
Runoff Area=7,842 sf
Runoff Volume=0.000 af
Runoff Depth=0.00"
Tc=10.0 min
CN=39
0.00
cfs
Page 111
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 6Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D5: D5
R
unoff = 2.39 cfs @ 12.13 hrs, Volume= 0.145 af, Depth= 1.78"
Routed to Pond P5 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 1-Year Rainfall=2.22"
Area (sf) CN Description
* 1
4,424 98 pavement
* 22,344 98 building
* 1,140 98 basin
4,553 39 >75% Grass cover, Good, HSG A
4
2,461 Weighted Average
4,553 10.72% Pervious Area
37,908 89.28% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6
.0 Direct Entry,
S
ubcatchment D5: D5
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
2
1
0
M
SE 24-hr 4
1-Year Rainfall=2.22"
Runoff Area=42,461 sf
Runoff Volume=0.145 af
Runoff Depth=1.78"
Tc=6.0 min
CN=WQ
2.39
cfs
Page 112
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 7Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment E1: existing
[4
5] Hint: Runoff=Zero
Runoff = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Depth= 0.00"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 1-Year Rainfall=2.22"
Area (ac) CN Description
2
.992 39 >75% Grass cover, Good, HSG A
2
.992 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry,
S
ubcatchment E1: existing
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
M
SE 24-hr 4
1-Year Rainfall=2.22"
Runoff Area=2.992 ac
Runoff Volume=0.000 af
Runoff Depth=0.00"
Tc=10.0 min
CN=39
0.00
cfs
Page 113
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 8Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P5:
[8
7] Warning: Oscillations may require smaller dt or Finer Routing (severity=36)
Inflow Area = 0.975 ac, 89.28% Impervious, Inflow Depth = 1.78" for 1-Year event
Inflow = 2.39 cfs @ 12.13 hrs, Volume= 0.145 af
Outflow = 0.21 cfs @ 12.85 hrs, Volume= 0.145 af, Atten= 91%, Lag= 43.7 min
Discarded = 0.21 cfs @ 12.85 hrs, Volume= 0.145 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 2L : offsite runoff
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,643.52' @ 12.85 hrs Surf.Area= 2,530 sf Storage= 2,764 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 118.4 min ( 879.6 - 761.2 )
Volume Invert Avail.Storage Storage Description
#
1 1,642.00' 24,860 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,642.00 1,140 0 0
1,643.00 2,020 1,580 1,580
1,644.00 3,000 2,510 4,090
1,645.00 4,000 3,500 7,590
1,646.00 5,270 4,635 12,225
1,647.00 20,000 12,635 24,860
Device Routing Invert Outlet Devices
#
1 Primary 1,644.75' 10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,642.00' 3.600 in/hr Exfiltration over Surface area
Discarded OutFlow Max=0.21 cfs @ 12.85 hrs HW=1,643.52' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.21 cfs)
P
rimary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,642.00' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 114
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 9Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P5:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
2
1
0
In
flow Area=0.975 ac
Peak Elev=1,643.52'
Storage=2,764 cf
2.39
cfs
0.21
cfs 0.21
cfs
0.00
cfs
Page 115
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 10Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Link 2L: offsite runoff
In
flow Area = 2.710 ac, 75.91% Impervious, Inflow Depth = 0.00" for 1-Year event
Inflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
L
ink 2L: offsite runoff
I
nflow
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
In
flow Area=2.710 ac
0.00
cfs 0.00
cfs
Page 116
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 11Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Link 4L: north
In
flow Area = 1.555 ac, 76.32% Impervious, Inflow Depth = 0.00" for 1-Year event
Inflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min
Routed to Link 2L : offsite runoff
Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
1-Year Inflow Imported from 26-0159 north~Link 1L.hce
L
ink 4L: north
I
nflow
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
Inf
low Area=1.555 ac
1-Year Inflow
Imported from
26-0159 north~Link 1L.hce
Area= 1.555 ac
76.32% Imperv.
0.00
cfs 0.00
cfs
Page 117
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 12Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
T
ime span=0.00-40.00 hrs, dt=0.05 hrs, 801 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Run
off Area=7,842 sf 0.00% Impervious Runoff Depth=0.00"S
ubcatchment 1S: Runoff
T
c=10.0 min CN=39 Runoff=0.00 cfs 0.000 af
Runoff Area=42,461 sf 89.28% Impervious Runoff Depth=2.08"S
ubcatchment D5: D5
T
c=6.0 min CN=WQ Runoff=2.77 cfs 0.169 af
Runoff Area=2.992 ac 0.00% Impervious Runoff Depth=0.00"S
ubcatchment E1: existing
T
c=10.0 min CN=39 Runoff=0.00 cfs 0.000 af
Peak Elev=1,643.74' Storage=3,337 cf Inflow=2.77 cfs 0.169 afP
ond P5:
D
iscarded=0.23 cfs 0.169 af Primary=0.00 cfs 0.000 af Outflow=0.23 cfs 0.169 af
Inflow=0.00 cfs 0.000 afL
ink 2L: offsite runoff
Pr
imary=0.00 cfs 0.000 af
2-Year Inflow Imported from 26-0159 north~Link 1L.hce Inflow=0.00 cfs 0.000 afL
ink 4L: north
Are
a= 1.555 ac 76.32% Imperv. Primary=0.00 cfs 0.000 af
T
otal Runoff Area = 4.147 ac Runoff Volume = 0.169 af Average Runoff Depth = 0.49"
79.01% Pervious = 3.277 ac 20.99% Impervious = 0.870 ac
Page 118
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 13Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment 1S: Runoff
[4
5] Hint: Runoff=Zero
Runoff = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Depth= 0.00"
Routed to Link 2L : offsite runoff
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 2-Year Rainfall=2.56"
Area (sf) CN Description
7
,842 39 >75% Grass cover, Good, HSG A
7
,842 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, min
S
ubcatchment 1S: Runoff
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
M
SE 24-hr 4
2-Year Rainfall=2.56"
Runoff Area=7,842 sf
Runoff Volume=0.000 af
Runoff Depth=0.00"
Tc=10.0 min
CN=39
0.00
cfs
Page 119
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 14Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D5: D5
R
unoff = 2.77 cfs @ 12.13 hrs, Volume= 0.169 af, Depth= 2.08"
Routed to Pond P5 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 2-Year Rainfall=2.56"
Area (sf) CN Description
* 1
4,424 98 pavement
* 22,344 98 building
* 1,140 98 basin
4,553 39 >75% Grass cover, Good, HSG A
4
2,461 Weighted Average
4,553 10.72% Pervious Area
37,908 89.28% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6
.0 Direct Entry,
S
ubcatchment D5: D5
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
3
2
1
0
M
SE 24-hr 4
2-Year Rainfall=2.56"
Runoff Area=42,461 sf
Runoff Volume=0.169 af
Runoff Depth=2.08"
Tc=6.0 min
CN=WQ
2.77
cfs
Page 120
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 15Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment E1: existing
[4
5] Hint: Runoff=Zero
Runoff = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Depth= 0.00"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 2-Year Rainfall=2.56"
Area (ac) CN Description
2
.992 39 >75% Grass cover, Good, HSG A
2
.992 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry,
S
ubcatchment E1: existing
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
M
SE 24-hr 4
2-Year Rainfall=2.56"
Runoff Area=2.992 ac
Runoff Volume=0.000 af
Runoff Depth=0.00"
Tc=10.0 min
CN=39
0.00
cfs
Page 121
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 16Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P5:
[8
7] Warning: Oscillations may require smaller dt or Finer Routing (severity=26)
Inflow Area = 0.975 ac, 89.28% Impervious, Inflow Depth = 2.08" for 2-Year event
Inflow = 2.77 cfs @ 12.13 hrs, Volume= 0.169 af
Outflow = 0.23 cfs @ 12.95 hrs, Volume= 0.169 af, Atten= 92%, Lag= 49.5 min
Discarded = 0.23 cfs @ 12.95 hrs, Volume= 0.169 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 2L : offsite runoff
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,643.74' @ 12.95 hrs Surf.Area= 2,743 sf Storage= 3,337 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 135.5 min ( 893.8 - 758.2 )
Volume Invert Avail.Storage Storage Description
#
1 1,642.00' 24,860 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,642.00 1,140 0 0
1,643.00 2,020 1,580 1,580
1,644.00 3,000 2,510 4,090
1,645.00 4,000 3,500 7,590
1,646.00 5,270 4,635 12,225
1,647.00 20,000 12,635 24,860
Device Routing Invert Outlet Devices
#
1 Primary 1,644.75' 10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,642.00' 3.600 in/hr Exfiltration over Surface area
Discarded OutFlow Max=0.23 cfs @ 12.95 hrs HW=1,643.74' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.23 cfs)
P
rimary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,642.00' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 122
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 17Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P5:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
3
2
1
0
In
flow Area=0.975 ac
Peak Elev=1,643.74'
Storage=3,337 cf
2.77
cfs
0.23
cfs 0.23
cfs
0.00
cfs
Page 123
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 18Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Link 2L: offsite runoff
In
flow Area = 2.710 ac, 75.91% Impervious, Inflow Depth = 0.00" for 2-Year event
Inflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
L
ink 2L: offsite runoff
I
nflow
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
In
flow Area=2.710 ac
0.00
cfs 0.00
cfs
Page 124
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 19Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Link 4L: north
In
flow Area = 1.555 ac, 76.32% Impervious, Inflow Depth = 0.00" for 2-Year event
Inflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min
Routed to Link 2L : offsite runoff
Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
2-Year Inflow Imported from 26-0159 north~Link 1L.hce
L
ink 4L: north
I
nflow
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
Inf
low Area=1.555 ac
2-Year Inflow
Imported from
26-0159 north~Link 1L.hce
Area= 1.555 ac
76.32% Imperv.
0.00
cfs 0.00
cfs
Page 125
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 20Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
T
ime span=0.00-40.00 hrs, dt=0.05 hrs, 801 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Run
off Area=7,842 sf 0.00% Impervious Runoff Depth=0.03"S
ubcatchment 1S: Runoff
T
c=10.0 min CN=39 Runoff=0.00 cfs 0.000 af
Runoff Area=42,461 sf 89.28% Impervious Runoff Depth=3.18"S
ubcatchment D5: D5
T
c=6.0 min CN=WQ Runoff=4.14 cfs 0.258 af
Runoff Area=2.992 ac 0.00% Impervious Runoff Depth=0.03"S
ubcatchment E1: existing
T
c=10.0 min CN=39 Runoff=0.01 cfs 0.007 af
Peak Elev=1,644.45' Storage=5,531 cf Inflow=4.14 cfs 0.258 afP
ond P5:
D
iscarded=0.29 cfs 0.258 af Primary=0.00 cfs 0.000 af Outflow=0.29 cfs 0.258 af
Inflow=0.00 cfs 0.000 afL
ink 2L: offsite runoff
Pr
imary=0.00 cfs 0.000 af
10-Year Inflow Imported from 26-0159 north~Link 1L.hce Inflow=0.00 cfs 0.000 afL
ink 4L: north
Are
a= 1.555 ac 76.32% Imperv. Primary=0.00 cfs 0.000 af
T
otal Runoff Area = 4.147 ac Runoff Volume = 0.265 af Average Runoff Depth = 0.77"
79.01% Pervious = 3.277 ac 20.99% Impervious = 0.870 ac
Page 126
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 21Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment 1S: Runoff
R
unoff = 0.00 cfs @ 18.40 hrs, Volume= 0.000 af, Depth= 0.03"
Routed to Link 2L : offsite runoff
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 10-Year Rainfall=3.79"
Area (sf) CN Description
7
,842 39 >75% Grass cover, Good, HSG A
7
,842 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, min
S
ubcatchment 1S: Runoff
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.001
0.001
0.001
0.001
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0
0
0
MSE
24-hr 4
10-Year Rainfall=3.79"
Runoff Area=7,842 sf
Runoff Volume=0.000 af
Runoff Depth=0.03"
Tc=10.0 min
CN=39
0.00
cfs
Page 127
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 22Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D5: D5
R
unoff = 4.14 cfs @ 12.13 hrs, Volume= 0.258 af, Depth= 3.18"
Routed to Pond P5 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 10-Year Rainfall=3.79"
Area (sf) CN Description
* 1
4,424 98 pavement
* 22,344 98 building
* 1,140 98 basin
4,553 39 >75% Grass cover, Good, HSG A
4
2,461 Weighted Average
4,553 10.72% Pervious Area
37,908 89.28% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6
.0 Direct Entry,
S
ubcatchment D5: D5
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
4
3
2
1
0
M
SE 24-hr 4
10-Year Rainfall=3.79"
Runoff Area=42,461 sf
Runoff Volume=0.258 af
Runoff Depth=3.18"
Tc=6.0 min
CN=WQ
4.14
cfs
Page 128
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 23Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment E1: existing
R
unoff = 0.01 cfs @ 18.40 hrs, Volume= 0.007 af, Depth= 0.03"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 10-Year Rainfall=3.79"
Area (ac) CN Description
2
.992 39 >75% Grass cover, Good, HSG A
2
.992 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry,
S
ubcatchment E1: existing
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.011
0.01
0.01
0.009
0.009
0.008
0.008
0.007
0.007
0.006
0.006
0.005
0.005
0.004
0.004
0.003
0.003
0.002
0.002
0.001
0.001
0.000
0
MSE
24-hr 4
10-Year Rainfall=3.79"
Runoff Area=2.992 ac
Runoff Volume=0.007 af
Runoff Depth=0.03"
Tc=10.0 min
CN=39
0.01
cfs
Page 129
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 24Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P5:
In
flow Area = 0.975 ac, 89.28% Impervious, Inflow Depth = 3.18" for 10-Year event
Inflow = 4.14 cfs @ 12.13 hrs, Volume= 0.258 af
Outflow = 0.29 cfs @ 13.18 hrs, Volume= 0.258 af, Atten= 93%, Lag= 63.0 min
Discarded = 0.29 cfs @ 13.18 hrs, Volume= 0.258 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 2L : offsite runoff
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,644.45' @ 13.18 hrs Surf.Area= 3,447 sf Storage= 5,531 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 191.3 min ( 942.6 - 751.2 )
Volume Invert Avail.Storage Storage Description
#
1 1,642.00' 24,860 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,642.00 1,140 0 0
1,643.00 2,020 1,580 1,580
1,644.00 3,000 2,510 4,090
1,645.00 4,000 3,500 7,590
1,646.00 5,270 4,635 12,225
1,647.00 20,000 12,635 24,860
Device Routing Invert Outlet Devices
#
1 Primary 1,644.75' 10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,642.00' 3.600 in/hr Exfiltration over Surface area
Discarded OutFlow Max=0.29 cfs @ 13.18 hrs HW=1,644.45' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.29 cfs)
P
rimary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,642.00' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 130
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 25Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P5:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
4
3
2
1
0
In
flow Area=0.975 ac
Peak Elev=1,644.45'
Storage=5,531 cf
4.14
cfs
0.29
cfs 0.29
cfs
0.00
cfs
Page 131
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 26Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Link 2L: offsite runoff
In
flow Area = 2.710 ac, 75.91% Impervious, Inflow Depth = 0.00" for 10-Year event
Inflow = 0.00 cfs @ 18.40 hrs, Volume= 0.000 af
Primary = 0.00 cfs @ 18.40 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
L
ink 2L: offsite runoff
I
nflow
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.001
0.001
0.001
0.001
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0
0
0
In
flow Area=2.710 ac
0.00
cfs 0.00
cfs
Page 132
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 27Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Link 4L: north
In
flow Area = 1.555 ac, 76.32% Impervious, Inflow Depth = 0.00" for 10-Year event
Inflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min
Routed to Link 2L : offsite runoff
Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
10-Year Inflow Imported from 26-0159 north~Link 1L.hce
L
ink 4L: north
I
nflow
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
Inf
low Area=1.555 ac
10-Year Inflow
Imported from
26-0159 north~Link 1L.hce
Area= 1.555 ac
76.32% Imperv.
0.00
cfs 0.00
cfs
Page 133
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 28Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
T
ime span=0.00-40.00 hrs, dt=0.05 hrs, 801 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Run
off Area=7,842 sf 0.00% Impervious Runoff Depth=0.58"S
ubcatchment 1S: Runoff
T
c=10.0 min CN=39 Runoff=0.06 cfs 0.009 af
Runoff Area=42,461 sf 89.28% Impervious Runoff Depth=5.59"S
ubcatchment D5: D5
T
c=6.0 min CN=WQ Runoff=7.09 cfs 0.454 af
Runoff Area=2.992 ac 0.00% Impervious Runoff Depth=0.58"S
ubcatchment E1: existing
T
c=10.0 min CN=39 Runoff=1.04 cfs 0.143 af
Peak Elev=1,645.01' Storage=7,633 cf Inflow=7.09 cfs 0.454 afP
ond P5:
D
iscarded=0.33 cfs 0.355 af Primary=3.81 cfs 0.099 af Outflow=4.14 cfs 0.454 af
Inflow=7.30 cfs 0.211 afL
ink 2L: offsite runoff
Pr
imary=7.30 cfs 0.211 af
100-Year Inflow Imported from 26-0159 north~Link 1L.hce Inflow=3.94 cfs 0.103 afL
ink 4L: north
Are
a= 1.555 ac 76.32% Imperv. Primary=3.94 cfs 0.103 af
T
otal Runoff Area = 4.147 ac Runoff Volume = 0.606 af Average Runoff Depth = 1.75"
79.01% Pervious = 3.277 ac 20.99% Impervious = 0.870 ac
Page 134
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 29Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment 1S: Runoff
R
unoff = 0.06 cfs @ 12.26 hrs, Volume= 0.009 af, Depth= 0.58"
Routed to Link 2L : offsite runoff
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 100-Year Rainfall=6.43"
Area (sf) CN Description
7
,842 39 >75% Grass cover, Good, HSG A
7
,842 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, min
S
ubcatchment 1S: Runoff
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.07
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
MSE
24-hr 4
100-Year Rainfall=6.43"
Runoff Area=7,842 sf
Runoff Volume=0.009 af
Runoff Depth=0.58"
Tc=10.0 min
CN=39
0.06
cfs
Page 135
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 30Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D5: D5
R
unoff = 7.09 cfs @ 12.13 hrs, Volume= 0.454 af, Depth= 5.59"
Routed to Pond P5 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 100-Year Rainfall=6.43"
Area (sf) CN Description
* 1
4,424 98 pavement
* 22,344 98 building
* 1,140 98 basin
4,553 39 >75% Grass cover, Good, HSG A
4
2,461 Weighted Average
4,553 10.72% Pervious Area
37,908 89.28% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6
.0 Direct Entry,
S
ubcatchment D5: D5
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
7
6
5
4
3
2
1
0
M
SE 24-hr 4
100-Year Rainfall=6.43"
Runoff Area=42,461 sf
Runoff Volume=0.454 af
Runoff Depth=5.59"
Tc=6.0 min
CN=WQ
7.09
cfs
Page 136
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 31Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment E1: existing
R
unoff = 1.04 cfs @ 12.26 hrs, Volume= 0.143 af, Depth= 0.58"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 100-Year Rainfall=6.43"
Area (ac) CN Description
2
.992 39 >75% Grass cover, Good, HSG A
2
.992 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry,
S
ubcatchment E1: existing
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
M
SE 24-hr 4
100-Year Rainfall=6.43"
Runoff Area=2.992 ac
Runoff Volume=0.143 af
Runoff Depth=0.58"
Tc=10.0 min
CN=39
1.04
cfs
Page 137
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 32Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P5:
In
flow Area = 0.975 ac, 89.28% Impervious, Inflow Depth = 5.59" for 100-Year event
Inflow = 7.09 cfs @ 12.13 hrs, Volume= 0.454 af
Outflow = 4.14 cfs @ 12.22 hrs, Volume= 0.454 af, Atten= 42%, Lag= 5.8 min
Discarded = 0.33 cfs @ 12.22 hrs, Volume= 0.355 af
Primary = 3.81 cfs @ 12.22 hrs, Volume= 0.099 af
Routed to Link 2L : offsite runoff
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,645.01' @ 12.22 hrs Surf.Area= 4,014 sf Storage= 7,633 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 174.4 min ( 919.3 - 744.9 )
Volume Invert Avail.Storage Storage Description
#
1 1,642.00' 24,860 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,642.00 1,140 0 0
1,643.00 2,020 1,580 1,580
1,644.00 3,000 2,510 4,090
1,645.00 4,000 3,500 7,590
1,646.00 5,270 4,635 12,225
1,647.00 20,000 12,635 24,860
Device Routing Invert Outlet Devices
#
1 Primary 1,644.75' 10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,642.00' 3.600 in/hr Exfiltration over Surface area
Discarded OutFlow Max=0.33 cfs @ 12.22 hrs HW=1,644.99' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.33 cfs)
P
rimary OutFlow Max=3.47 cfs @ 12.22 hrs HW=1,644.99' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir (Weir Controls 3.47 cfs @ 1.30 fps)
Page 138
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 33Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P5:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
7
6
5
4
3
2
1
0
In
flow Area=0.975 ac
Peak Elev=1,645.01'
Storage=7,633 cf
7.09
cfs
4.14
cfs
0.33
cfs
3.81
cfs
Page 139
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 34Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Link 2L: offsite runoff
In
flow Area = 2.710 ac, 75.91% Impervious, Inflow Depth = 0.93" for 100-Year event
Inflow = 7.30 cfs @ 12.26 hrs, Volume= 0.211 af
Primary = 7.30 cfs @ 12.26 hrs, Volume= 0.211 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
L
ink 2L: offsite runoff
I
nflow
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
8
7
6
5
4
3
2
1
0
In
flow Area=2.710 ac
7.30
cfs 7.30
cfs
Page 140
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 35Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Link 4L: north
In
flow Area = 1.555 ac, 76.32% Impervious, Inflow Depth = 0.79" for 100-Year event
Inflow = 3.94 cfs @ 12.27 hrs, Volume= 0.103 af
Primary = 3.94 cfs @ 12.27 hrs, Volume= 0.103 af, Atten= 0%, Lag= 0.0 min
Routed to Link 2L : offsite runoff
Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
100-Year Inflow Imported from 26-0159 north~Link 1L.hce
L
ink 4L: north
I
nflow
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
4
3
2
1
0
Inf
low Area=1.555 ac
100-Year Inflow
Imported from
26-0159 north~Link 1L.hce
Area= 1.555 ac
76.32% Imperv.
3.94
cfs 3.94
cfs
Page 141
T
able of Contents2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
T
ABLE OF CONTENTS
Project Reports
1
Routing Diagram
2 Rainfall Events Listing
3 Area Listing (all nodes)
1-Year Event
4
Node Listing
5 Subcat 1S: Runoff
6 Subcat D5: D5
7 Subcat E1: existing
8 Pond P5:
10 Link 2L: offsite runoff
11 Link 4L: north
2-Year Event
1
2 Node Listing
13 Subcat 1S: Runoff
14 Subcat D5: D5
15 Subcat E1: existing
16 Pond P5:
18 Link 2L: offsite runoff
19 Link 4L: north
10-Year Event
2
0 Node Listing
21 Subcat 1S: Runoff
22 Subcat D5: D5
23 Subcat E1: existing
24 Pond P5:
26 Link 2L: offsite runoff
27 Link 4L: north
100-Year Event
2
8 Node Listing
29 Subcat 1S: Runoff
30 Subcat D5: D5
31 Subcat E1: existing
32 Pond P5:
34 Link 2L: offsite runoff
35 Link 4L: north
Page 142
AP
PENDIX D
Proposed Infiltration and WinSLAMM Calculations
Page 143
U-H
aul Eagle River
Loc
ation:
Inflow Area: 118,048 sf
Rainfall Total: 22.63 in
Tota
l Volume= Inf
low Area x Rainfall Total
Tota
l Volume: 222,618 cf
Volume Leaving Site: 0
Exist
ing Infiltration Volume =
Total Volume-Volume Leaving Site
Exist
ing Infiltration Volume: 222,618 cf
Pr
oposed Infiltration Volume:
Inf
low Area: 118,048 sf
Total Rainfall Infiltrated: 22.63 in
Tota
l Volume= Inf
low Area x Rainfall Total
Tota
l Potential Volume Runoff: 222,618 cf
Ou
tfall Total (from WinSLAMM): 127 cf
Prop
osed Infiltration Volume 222,491 cf
Pe
rcent of Pre-development Infiltration Volume Infiltrated:
Inf
iltration Percent =
Proposed Infiltration Volume/Existing Infiltration Volume
Inf
iltration Percent: 99.94%
Dat
e: 5/28/2026
Cit
y of Eagle River
Existing Infiltration Volume:
In
filtration Volumes
Ca
lculated by: Dustin Vreeland
Page 144
Dat
a file name: \\VREELAND-SERVER\Data\Vital\Cad Files\2026\26-0159 Barnes - UHaul Eagle
River\26-0159 winslamm.mdb
WinSLAMM Version 10.5.0
Rain file name: C:\WinSLAMM Files\Rain Files\WisReg - Green Bay WI 1969.RAN
Particulate Solids Concentration file name: C:\WinSLAMM Files\v10.1 WI_AVG01.pscx
Runoff Coefficient file name: C:\WinSLAMM Files\WI_SL06 Dec06.rsvx
Residential Street Delivery file name: C:\WinSLAMM Files\WI_Res and Other Urban Dec06.std
Institutional Street Delivery file name: C:\WinSLAMM Files\WI_Res and Other Urban
Dec06.std
Commercial Street Delivery file name: C:\WinSLAMM Files\WI_Res and Other Urban Dec06.std
Industrial Street Delivery file name: C:\WinSLAMM Files\WI_Res and Other Urban Dec06.std
Other Urban Street Delivery file name: C:\WinSLAMM Files\WI_Res and Other Urban Dec06.std
Freeway Street Delivery file name: C:\WinSLAMM Files\WI_Res and Other Urban Dec06.std
Apply Street Delivery Files to Adjust the After Event Load Street Dirt Mass Balance:
False
Pollutant Relative Concentration file name: C:\WinSLAMM Files\WI_GEO03.ppdx
Source Area PSD and Peak to Average Flow Ratio File: C:\WinSLAMM Files\NURP Source Area
PSD Files.csv
Cost Data file name:
Seed for random number generator: -42
Study period starting date: 01/02/69 Study period ending date: 12/28/69
Start of Winter Season: 11/25 End of Winter Season: 03/29
Date: 05-28-2026 Time: 22:17:46
Site information:
LU# 1 - Commercial: Commercial 1 Total area (ac): 0.421
1 - Roofs 1: 0.268 ac. Pitched Connected Source Area PSD File: C:\WinSLAMM
Files\NURP.cpz
13 - Paved Parking 1: 0.110 ac. Connected Source Area PSD File: C:\WinSLAMM
Files\NURP.cpz
51 - Small Landscaped Areas 1: 0.042 ac. Normal Sandy Source Area PSD File:
C:\WinSLAMM Files\NURP.cpz
70 - Water Body Areas: 0.001 ac. Source Area PSD File:
LU# 2 - Commercial: Commercial 2 Total area (ac): 0.934
1 - Roofs 1: 0.333 ac. Pitched Connected Source Area PSD File: C:\WinSLAMM
Files\NURP.cpz
13 - Paved Parking 1: 0.387 ac. Connected Source Area PSD File: C:\WinSLAMM
Files\NURP.cpz
51 - Small Landscaped Areas 1: 0.200 ac. Normal Sandy Source Area PSD File:
C:\WinSLAMM Files\NURP.cpz
70 - Water Body Areas: 0.014 ac. Source Area PSD File:
LU# 3 - Commercial: Commercial 3 Total area (ac): 0.081
1 - Roofs 1: 0.021 ac. Pitched Connected Source Area PSD File: C:\WinSLAMM
Files\NURP.cpz
13 - Paved Parking 1: 0.007 ac. Connected Source Area PSD File: C:\WinSLAMM
Files\NURP.cpz
51 - Small Landscaped Areas 1: 0.049 ac. Normal Sandy Source Area PSD File:
C:\WinSLAMM Files\NURP.cpz
70 - Water Body Areas: 0.004 ac. Source Area PSD File:
LU# 4 - Commercial: Commercial 4 Total area (ac): 0.119
1 - Roofs 1: 0.034 ac. Pitched Connected Source Area PSD File: C:\WinSLAMM
Files\NURP.cpz
51 - Small Landscaped Areas 1: 0.078 ac. Normal Sandy Source Area PSD File:
Page 145
C:\
WinSLAMM Files\NURP.cpz
70 - Water Body Areas: 0.007 ac. Source Area PSD File:
LU# 5 - Commercial: Commercial 5 Total area (ac): 0.975
1 - Roofs 1: 0.513 ac. Pitched Connected Source Area PSD File: C:\WinSLAMM
Files\NURP.cpz
13 - Paved Parking 1: 0.331 ac. Connected Source Area PSD File: C:\WinSLAMM
Files\NURP.cpz
51 - Small Landscaped Areas 1: 0.105 ac. Normal Sandy Source Area PSD File:
C:\WinSLAMM Files\NURP.cpz
70 - Water Body Areas: 0.026 ac. Source Area PSD File:
LU# 6 - Commercial: Commercial 6 Total area (ac): 0.180
51 - Small Landscaped Areas 1: 0.180 ac. Normal Sandy Source Area PSD File:
C:\WinSLAMM Files\NURP.cpz
Control Practice 1: Biofilter CP# 1 (DS) - P1
1. Top area (square feet) = 810
2. Bottom aea (square feet) = 1
3. Depth (ft): 4
4. Biofilter width (ft) - for Cost Purposes Only: 10
5. Infiltration rate (in/hr) = 3.6
6. Random infiltration rate generation? No
7. Infiltration rate fraction (side): 0.001
8. Infiltration rate fraction (bottom): 1
9. Depth of biofilter that is rock filled (ft) 0
10. Porosity of rock filled volume = 0
11. Engineered soil infiltration rate: 0
12. Engineered soil depth (ft) = 0
13. Engineered soil porosity = 0
14. Percent solids reduction due to flow through engineered soil = 0
15. Biofilter peak to average flow ratio = 3.8
16. Number of biofiltration control devices = 1
17. Particle size distribution file: Not needed - calculated by program
18. Initial water surface elevation (ft): 0
Soil Data Soil Type Fraction in Eng. Soil
Biofilter Outlet/Discharge Characteristics:
Outlet type: Broad Crested Weir
1. Weir crest length (ft): 5
2. Weir crest width (ft): 5
3. Height of datum to bottom of weir opening: 3
Outlet type: Surface Discharge Pipe
1. Surface discharge pipe outlet diameter (ft): 0.67
2. Pipe invert elevation above datum (ft): 1.15
3. Number of surface pipe outlets: 1
Control Practice 2: Biofilter CP# 2 (DS) - P2
1. Top area (square feet) = 6100
2. Bottom aea (square feet) = 500
3. Depth (ft): 4
4. Biofilter width (ft) - for Cost Purposes Only: 10
5. Infiltration rate (in/hr) = 3.6
6. Random infiltration rate generation? No
7. Infiltration rate fraction (side): 0.001
8. Infiltration rate fraction (bottom): 1
Page 146
9. Depth of biofilter that is rock filled (ft) 0
10. Porosity of rock filled volume = 0
11. Engineered soil infiltration rate: 0
12. Engineered soil depth (ft) = 0
13. Engineered soil porosity = 0
14. Percent solids reduction due to flow through engineered soil = 0
15. Biofilter peak to average flow ratio = 3.8
16. Number of biofiltration control devices = 1
17. Particle size distribution file: Not needed - calculated by program
18. Initial water surface elevation (ft): 0
Soil Data Soil Type Fraction in Eng. Soil
Biofilter Outlet/Discharge Characteristics:
Outlet type: Broad Crested Weir
1. Weir crest length (ft): 10
2. Weir crest width (ft): 5
3. Height of datum to bottom of weir opening: 3
Outlet type: Surface Discharge Pipe
1. Surface discharge pipe outlet diameter (ft): 1
2. Pipe invert elevation above datum (ft): 2.15
3. Number of surface pipe outlets: 1
Control Practice 3: Biofilter CP# 3 (DS) - P3
1. Top area (square feet) = 10000
2. Bottom aea (square feet) = 460
3. Depth (ft): 3
4. Biofilter width (ft) - for Cost Purposes Only: 10
5. Infiltration rate (in/hr) = 3.6
6. Random infiltration rate generation? No
7. Infiltration rate fraction (side): 0.001
8. Infiltration rate fraction (bottom): 1
9. Depth of biofilter that is rock filled (ft) 0
10. Porosity of rock filled volume = 0
11. Engineered soil infiltration rate: 0
12. Engineered soil depth (ft) = 0
13. Engineered soil porosity = 0
14. Percent solids reduction due to flow through engineered soil = 0
15. Biofilter peak to average flow ratio = 3.8
16. Number of biofiltration control devices = 1
17. Particle size distribution file: Not needed - calculated by program
18. Initial water surface elevation (ft): 0
Soil Data Soil Type Fraction in Eng. Soil
Biofilter Outlet/Discharge Characteristics:
Outlet type: Broad Crested Weir
1. Weir crest length (ft): 10
2. Weir crest width (ft): 4
3. Height of datum to bottom of weir opening: 1
Control Practice 4: Biofilter CP# 4 (DS) - P4
1. Top area (square feet) = 10000
2. Bottom aea (square feet) = 800
3. Depth (ft): 3
4. Biofilter width (ft) - for Cost Purposes Only: 10
5. Infiltration rate (in/hr) = 3.6
6. Random infiltration rate generation? No
7. Infiltration rate fraction (side): 0.001
8. Infiltration rate fraction (bottom): 1
Page 147
9. Depth of biofilter that is rock filled (ft) 0
10. Porosity of rock filled volume = 0
11. Engineered soil infiltration rate: 0
12. Engineered soil depth (ft) = 0
13. Engineered soil porosity = 0
14. Percent solids reduction due to flow through engineered soil = 0
15. Biofilter peak to average flow ratio = 3.8
16. Number of biofiltration control devices = 1
17. Particle size distribution file: Not needed - calculated by program
18. Initial water surface elevation (ft): 0
Soil Data Soil Type Fraction in Eng. Soil
Biofilter Outlet/Discharge Characteristics:
Outlet type: Broad Crested Weir
1. Weir crest length (ft): 10
2. Weir crest width (ft): 4
3. Height of datum to bottom of weir opening: 2
Control Practice 5: Biofilter CP# 5 (DS) - P5
1. Top area (square feet) = 20000
2. Bottom aea (square feet) = 1140
3. Depth (ft): 5
4. Biofilter width (ft) - for Cost Purposes Only: 10
5. Infiltration rate (in/hr) = 3.6
6. Random infiltration rate generation? No
7. Infiltration rate fraction (side): 0.001
8. Infiltration rate fraction (bottom): 1
9. Depth of biofilter that is rock filled (ft) 0
10. Porosity of rock filled volume = 0
11. Engineered soil infiltration rate: 0
12. Engineered soil depth (ft) = 0
13. Engineered soil porosity = 0
14. Percent solids reduction due to flow through engineered soil = 0
15. Biofilter peak to average flow ratio = 3.8
16. Number of biofiltration control devices = 1
17. Particle size distribution file: Not needed - calculated by program
18. Initial water surface elevation (ft): 0
Soil Data Soil Type Fraction in Eng. Soil
Biofilter Outlet/Discharge Characteristics:
Outlet type: Broad Crested Weir
1. Weir crest length (ft): 10
2. Weir crest width (ft): 4
3. Height of datum to bottom of weir opening: 2.75
Page 148
SLA
MM for Windows Version 10.5.0
(c) Copyright Robert Pitt and John Voorhees 2019, All Rights Reserved
Data file name: \\VREELAND-SERVER\Data\Vital\Cad Files\2026\26-0159 Barnes - UHaul Eagle
River\26-0159 winslamm.mdb
Data file description:
Rain file name: C:\WinSLAMM Files\Rain Files\WisReg - Green Bay WI 1969.RAN
Particulate Solids Concentration file name: C:\WinSLAMM Files\v10.1 WI_AVG01.pscx
Runoff Coefficient file name: C:\WinSLAMM Files\WI_SL06 Dec06.rsvx
Pollutant Relative Concentration file name: C:\WinSLAMM Files\WI_GEO03.ppdx
Residential Street Delivery file name: C:\WinSLAMM Files\WI_Res and Other Urban Dec06.std
Institutional Street Delivery file name: C:\WinSLAMM Files\WI_Res and Other Urban
Dec06.std
Commercial Street Delivery file name: C:\WinSLAMM Files\WI_Res and Other Urban Dec06.std
Industrial Street Delivery file name: C:\WinSLAMM Files\WI_Res and Other Urban Dec06.std
Other Urban Street Delivery file name: C:\WinSLAMM Files\WI_Res and Other Urban Dec06.std
Freeway Street Delivery file name: C:\WinSLAMM Files\WI_Res and Other Urban Dec06.std
Apply Street Delivery Files to Adjust the After Event Load Street Dirt Mass Balance:
False
Source Area PSD and Peak to Average Flow Ratio File: C:\WinSLAMM Files\NURP Source Area
PSD Files.csv
Cost Data file name:
Seed for random number generator: -42
Start of Winter Season: 11/25 End of Winter Season: 03/29
Model Run Start Date: 01/02/69 Model Run End Date: 12/28/69
Date of run: 05-28-2026 Time of run: 22:17:27
Total Area Modeled (acres): 2.710
Years in Model Run: 0.99
Runoff Percent Particulate
Particulate Percent
Volume Runoff Solids
Solids Particulate
(cu ft) Volume Conc.
Yield Solids
Reduction (mg/L)
(lbs) Reduction
Total of all Land Uses without Controls: 139829 - 65.90
575.2 -
Outfall Total with Controls: 127.4 99.91% 227.0
1.806 99.69%
Annualized Total After Outfall Controls: 129.2
1.831
. Percent Solids Reduction due to Engineered Media Not Used
. Percent Solids Reduction due to Engineered Media Not Used
. Percent Solids Reduction due to Engineered Media Not Used
. Percent Solids Reduction due to Engineered Media Not Used
. Percent Solids Reduction due to Engineered Media Not Used
Page 149
AP
PENDIX E
Soil Loss and Sediment Discharge Map and Calculations
Page 150
Y
EAR 1
Dev
eloper:
Project:
Date:
County: Version 2.1
A
ctivity
(1
)
Begin
Dat
e
(2
)
End Date
(3)
Period
%
R
(4
)
A
nnual R
F
actor (5)
Sub Soil Texture
(6)
Soil
Er
odibility K
F
actor (7)
Slope
(%
)
(8
)
Slope
Length
(f
t)
(9
)
LS
Factor
(10)
L
and Cover
C F
actor
(1
1)
Soil loss A
(tons/acre)
(12)
SDF
(13)
Sediment Control
Pr
actice
(1
4)
Sediment
Discharge
(t/ac) (15)
07
/01/26 04/01/27 64.2% 100 0.15 1.2% 195 0.17 1.00 1.7 0.924 0.9
04/01/27 06/01/27 16.4% 100 Sa
nd 0.
15 1.2% 195 0.17 0.10 0.0 0.924 0.0
06/01/27 ----- ----- ----- --
----- --
--- 1.2% 195 0.17 ------ ----- 0.000 0.0
----- ----- ----- --
----- --
--- 1.2% 195 0.17 ----- ----- 0.000 0.0
----- ----- ----- --
----- --
--- 1.2% 0 ----- ----- ----- 0.000 0.0
----- ----- ----- --
----- --
--- 0.0% 0 ----- ----- ----- 0.000 0.0
T
OTAL 1.7 TOTAL 1.0
Notes:
%
Reduction
Required NONE
Se
e Help Page for further descriptions of variables and items in drop-down boxes.
The last land disturbing activity on each sheet must be 'End'. This is either 12 months from the start of construction or final stabilization.
For periods of construction that exceed 12 months, please demonstrate that 5 tons/acre/year is not exceeded in any given 12 month period.
Recommended Permanent Seeding Dates:
4/15-6/1 and 8/1-8/21 Turf, introduced grasses and legumes Desig
ned By: Dustin Vreeland
Thaw
-6/30 Native Grasses, forbs, and legumes Dat
e 5/28/2026
NOT
E: THIS TOOL ONLY ADDRESSED SOIL EROSION DUE TO
SHEET FLOW. MEASURES TO CONTROL CHANNEL EROSION MAY
ALSO BE REQUIRED TO MEET SEDIMENT DISCHARGE
REQUIREMENTS.
So
il Loss & Sediment Discharge Calculation Tool
for
use on Construction Sites in the State of Wisconsin
05
/28/26
W
DNR Version 2.1 (12-05-2024)
U-Ha
ul
U-Haul Eagle River
Ba
re Ground
Se
ed with Mulch or Ero
En
d
Sa
nd
V
ilas
Si
lt Fence
Si
lt Fence
C:\Use
rs\sadmin\Desktop\USLEmodel.xlsm
Page 151
AP
PENDIX F
State of Wisconsin Construction Site Inspection Report
Page 152
l
2 If the project is not on schedule then the soil loss summary for the project should be reviewed and schedule, plan or practices modified accordingly.
CONSTRUCTION SITE INSPECTION REPORT
Form 3400-187 (R 11/16) Page 1 of 2
State of Wisconsin
Department of Natural Resources (DNR)
PO Box 7921, Madison WI 53707-7921
dnr.wi.gov
Notice: This form was developed in accordance with s. NR 216.48 Wis. Adm. Code for WPDES permittees’ convenience; however, use of this specific form is voluntary. Multiple copies of this form
may be made to compile the inspection report. Inspections of the construction site and implemented erosion and sediment control best management practices (BMPs) must be performed weekly
and within 24 hours after a rainfall event 0.5 inches or greater.
Construction Site Name and Location (Project, Municipality, and County):
Onsite Contact/Contractor:
Site/Facility ID No. (FIN):
Onsite Phone/Cell:
Note: Inspection reports, along with erosion control and storm water management plans, are required to be maintained on site in accordance with s. NR 216.48 (4)
and made available upon request. PLEASE PRINT LEGIBLY.
Date of inspection: Time of inspection:
Start: am pm
End: am pm
Type of inspection:
Weekly Precipitation Event Other (specify)
Weather/Site Conditions:
Antecedent
Soil Moisture
Last Rainfall Depth:
Temp.
inches
Last Rainfall Date:
°F
Dry
Variable
Wet
Frozen or snow covered
Melting Snow/slush
Describe current phase of construction:
Project on Schedule2? Yes No
Scheduled Final Stabilization Date for Universal Soil Loss Equation (USLE) 1 :
Name(s) of individual(s) performing inspection: Inspector Phone/Cell:
I certify that the information contained on this form is an accurate assessment of site conditions at the time of inspection:
Inspector Signature Date:
Inspection Questions: Yes No (Identify Actions Required): Location/Comments: Actions Completed
by Date & Initials
1. Is the erosion control plan accessible to operators? Provide onsite copy
2. Is the permit certificate posted where visible? Post certificate
3. Is the current phase of construction on sequence with
the site-specific erosion and sediment control plan,
including installation/stabilization of ponds and
ditches?
Add sediment control
Install missing ditch/pipe/pond
Stabilize bare soil
4. Are all erosion and sediment control BMPs shown on
plan properly installed and in functional condition?
Repair
Modify
Install/Replace
5. Is inlet protection properly installed and functioning in
all inlets likely to receive runoff from the site?
Clean
Replace
Install
6. Is the air free of fugitive dust resulting from
construction activity and bare soil exposure?
Apply water
Apply dust control product
Page 153
CONSTRUCTION SITE INSPECTION REPORT
Form 3400-187 (R 11/16)
State of Wisconsin
Department of Natural Resources
dnr.wi.gov
4
Page 2 of 2
Inspection Questions: Yes No (Identify Actions Required): Location/Comments: Actions Completed
by Date & Initials
7. Is the public right of way curb line free of tracked soil
and accumulation?
Install tracking pad
Widen/lengthen pad
Amend stone/Add geotextile
Install wheel washing station
Close entrance/exit
Limit traffic across disturbed areas
Sweep road and curb line
8. Are wetlands, lakes, streams, ditches, or storm sewers
downstream of the site free of sedimentation and
turbid water leaving the site?3
Add sediment controls
Modify operations
Contact DNR to verify extent of cleanup
required
9. Is dewatering and/or vehicle and equipment washing
being done in a manner that prevents erosion and
sediment discharge?
Install treatment train
Install energy dissipation
Modify discharge location
Modify intake to reduce sediment
10. Are soil stockpiles existing for more than 7 days
covered and stabilized?
Seed
Install mat/mulch/polymer
Cover with tarp/plastic sheeting
11. Are downstream channels and other downhill areas
protected from scour and erosion?
Install energy dissipation at outfall
Install ditch checks
Install slope interruption
Install onsite detention
12. Are good housekeeping practices or treatment controls
in place to prevent the discharge of chemicals,
cement, trash, and other materials into wetlands,
waterways, storm sewers, ditches, or drainage-ways?4
Properly dispose of trash
Provide concrete washout station
Contact DNR to verify extent of cleanup
required
13. Is the plan reflective of current site operations and
does it address all erosion and sediment control
issues identified during the inspection?
Revise sequence
Revise sediment control BMP
Revise erosion control BMP
Revise post-construction storm water BMP
14. Are all areas where construction has temporarily
ceased (and will not resume for more than 2 weeks)
temporarily stabilized?
Topsoil & seed
Install mat/mulch/polymer
Cover with tarp/plastic sheeting
15. Are all areas at final grade permanently vegetated
or stabilized with other treatments?
Topsoil & seed
Install mat/mulch/polymer
Sod
Install stone base
16. Have temporary sediment controls been removed in
areas of the site that meet the permit definition of
‘final stabilization’?
Water to establish vegetation
Repair or reseed areas
Remove temporary practices
Page 154
D1
D1
D2
D2
D3
D3
D4
D4
P1 P2 P3 P4
1
L
li
nk
R
outing Diagram for 26-0159 north
Prepared by Vreeland Associates, Printed 5/28/2026
Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Subcat Rea
ch Pond L
ink
Page 155
2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 2Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
R
ainfall Events Listing
Event# Event
Nam
e
Storm Type Curve Mode Duration
(hours)
B/B Depth
(inches)
AMC
1 1-
Year MSE 24-hr 4 Default 24.00 1 2.22 2
2 2-Year MSE 24-hr 4 Default 24.00 1 2.56 2
3 10-Year MSE 24-hr 4 Default 24.00 1 3.79 2
4 100-Year MSE 24-hr 4 Default 24.00 1 6.43 2
Page 156
2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 3Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
A
rea Listing (all nodes)
Are
a
(acres)
CN Description
(subcatchment-numbers)
0.368 39 >75%
Grass cover, Good, HSG A (D1, D2, D3, D4)
0.026 98 basin (D1, D2, D3, D4)
0.657 98 building (D1, D2, D3, D4)
0.504 98 parking lot (D1, D2, D3)
1.555 84 TOTAL AREA
Page 157
2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 4Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ipe Listing (all nodes)
Line# Nod
e
Number
In-Invert
(feet)
Out-Invert
(feet)
Length
(feet)
Slope
(ft/ft)
n Width
(inches)
Diam/Height
(inches)
Inside-Fill
(inches)
Node
Name
1 P1 1,642.1
5 1,642.00 55.0 0.0027 0.012 0.0 8.0 0.0
2 P2 1,643.15 1,643.00 55.0 0.0027 0.012 0.0 12.0 0.0
Page 158
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 5Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
T
ime span=0.00-40.00 hrs, dt=0.05 hrs, 801 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Run
off Area=18,312 sf 90.12% Impervious Runoff Depth=1.80"S
ubcatchment D1: D1
T
c=10.0 min CN=WQ Runoff=0.91 cfs 0.063 af
Runoff Area=40,724 sf 78.59% Impervious Runoff Depth=1.57"S
ubcatchment D2: D2
T
c=10.0 min CN=WQ Runoff=1.76 cfs 0.122 af
Runoff Area=3,535 sf 39.52% Impervious Runoff Depth=0.79"S
ubcatchment D3: D3
T
c=10.0 min CN=WQ Runoff=0.08 cfs 0.005 af
Runoff Area=5,176 sf 34.78% Impervious Runoff Depth=0.69"S
ubcatchment D4: D4
T
c=10.0 min CN=WQ Runoff=0.10 cfs 0.007 af
Peak Elev=1,642.91' Storage=168 cf Inflow=0.91 cfs 0.063 afP
ond P1:
D
iscarded=0.02 cfs 0.016 af Primary=0.80 cfs 0.047 af Secondary=0.00 cfs 0.000 af Outflow=0.82 cfs 0.063 af
Peak Elev=1,642.79' Storage=3,521 cf Inflow=2.51 cfs 0.169 afP
ond P2:
D
iscarded=0.31 cfs 0.169 af Primary=0.00 cfs 0.000 af Secondary=0.00 cfs 0.000 af Outflow=0.31 cfs 0.169 af
Peak Elev=1,642.04' Storage=21 cf Inflow=0.08 cfs 0.005 afP
ond P3:
D
iscarded=0.04 cfs 0.005 af Primary=0.00 cfs 0.000 af Secondary=0.00 cfs 0.000 af Outflow=0.04 cfs 0.005 af
Peak Elev=1,642.02' Storage=13 cf Inflow=0.10 cfs 0.007 afP
ond P4:
D
iscarded=0.07 cfs 0.007 af Primary=0.00 cfs 0.000 af Outflow=0.07 cfs 0.007 af
Inflow=0.00 cfs 0.000 afL
ink 1L: link
Pr
imary=0.00 cfs 0.000 af
T
otal Runoff Area = 1.555 ac Runoff Volume = 0.197 af Average Runoff Depth = 1.52"
23.68% Pervious = 0.368 ac 76.32% Impervious = 1.187 ac
Page 159
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 6Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D1: D1
R
unoff = 0.91 cfs @ 12.17 hrs, Volume= 0.063 af, Depth= 1.80"
Routed to Pond P1 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 1-Year Rainfall=2.22"
Area (sf) CN Description
* 4
,776 98 parking lot
* 11,687 98 building
* 40 98 basin
1,809 39 >75% Grass cover, Good, HSG A
1
8,312 Weighted Average
1,809 9.88% Pervious Area
16,503 90.12% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, minimum
S
ubcatchment D1: D1
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
M
SE 24-hr 4
1-Year Rainfall=2.22"
Runoff Area=18,312 sf
Runoff Volume=0.063 af
Runoff Depth=1.80"
Tc=10.0 min
CN=WQ
0.91
cfs
Page 160
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 7Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D2: D2
R
unoff = 1.76 cfs @ 12.17 hrs, Volume= 0.122 af, Depth= 1.57"
Routed to Pond P2 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 1-Year Rainfall=2.22"
Area (sf) CN Description
* 6
30 98 basin
* 16,865 98 parking lot
8,720 39 >75% Grass cover, Good, HSG A
* 14,509 98 building
4
0,724 Weighted Average
8,720 21.41% Pervious Area
32,004 78.59% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, minimum
S
ubcatchment D2: D2
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)1
0
M
SE 24-hr 4
1-Year Rainfall=2.22"
Runoff Area=40,724 sf
Runoff Volume=0.122 af
Runoff Depth=1.57"
Tc=10.0 min
CN=WQ
1.76
cfs
Page 161
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 8Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D3: D3
R
unoff = 0.08 cfs @ 12.17 hrs, Volume= 0.005 af, Depth= 0.79"
Routed to Pond P3 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 1-Year Rainfall=2.22"
Area (sf) CN Description
* 3
03 98 parking lot
* 924 98 building
* 170 98 basin
2,138 39 >75% Grass cover, Good, HSG A
3
,535 Weighted Average
2,138 60.48% Pervious Area
1,397 39.52% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, minimum
S
ubcatchment D3: D3
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.085
0.08
0.075
0.07
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
MSE
24-hr 4
1-Year Rainfall=2.22"
Runoff Area=3,535 sf
Runoff Volume=0.005 af
Runoff Depth=0.79"
Tc=10.0 min
CN=WQ
0.08
cfs
Page 162
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 9Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D4: D4
R
unoff = 0.10 cfs @ 12.17 hrs, Volume= 0.007 af, Depth= 0.69"
Routed to Pond P4 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 1-Year Rainfall=2.22"
Area (sf) CN Description
* 1
,500 98 building
* 300 98 basin
3,376 39 >75% Grass cover, Good, HSG A
5
,176 Weighted Average
3,376 65.22% Pervious Area
1,800 34.78% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, miminum
S
ubcatchment D4: D4
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.11
0.105
0.1
0.095
0.09
0.085
0.08
0.075
0.07
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
M
SE 24-hr 4
1-Year Rainfall=2.22"
Runoff Area=5,176 sf
Runoff Volume=0.007 af
Runoff Depth=0.69"
Tc=10.0 min
CN=WQ
0.10
cfs
Page 163
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 10Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P1:
In
flow Area = 0.420 ac, 90.12% Impervious, Inflow Depth = 1.80" for 1-Year event
Inflow = 0.91 cfs @ 12.17 hrs, Volume= 0.063 af
Outflow = 0.82 cfs @ 12.21 hrs, Volume= 0.063 af, Atten= 9%, Lag= 2.7 min
Discarded = 0.02 cfs @ 12.21 hrs, Volume= 0.016 af
Primary = 0.80 cfs @ 12.21 hrs, Volume= 0.047 af
Routed to Pond P2 :
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 1L : link
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,642.91' @ 12.21 hrs Surf.Area= 285 sf Storage= 168 cf
Plug-Flow detention time= 20.2 min calculated for 0.063 af (100% of inflow)
Center-of-Mass det. time= 20.4 min ( 785.4 - 765.0 )
Volume Invert Avail.Storage Storage Description
#
1 1,641.00' 11,161 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,641.00 1 0 0
1,642.00 40 21 21
1,643.00 310 175 196
1,644.00 810 560 756
1,645.00 20,000 10,405 11,161
Device Routing Invert Outlet Devices
#
1 Secondary 1,644.00' 5.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,641.00' 3.600 in/hr Exfiltration over Surface area
#3 Primary 1,642.15' 8.0" Round Culvert
L= 55.0' RCP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 1,642.15' / 1,642.00' S= 0.0027 '/' Cc= 0.900
n= 0.012, Flow Area= 0.35 sf
Discarded OutFlow Max=0.02 cfs @ 12.21 hrs HW=1,642.90' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.02 cfs)
P
rimary OutFlow Max=0.79 cfs @ 12.21 hrs HW=1,642.90' TW=1,642.47' (Dynamic Tailwater)
3=Culvert (Barrel Controls 0.79 cfs @ 2.51 fps)
S
econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,641.00' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 164
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 11Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P1:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
Se
condary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
In
flow Area=0.420 ac
Peak Elev=1,642.91'
Storage=168 cf
0.91
cfs
0.82
cfs
0.02
cfs
0.80
cfs
0.00
cfs
Page 165
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 12Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P2:
[8
7] Warning: Oscillations may require smaller dt or Finer Routing (severity=24)
Inflow Area = 1.355 ac, 82.17% Impervious, Inflow Depth = 1.50" for 1-Year event
Inflow = 2.51 cfs @ 12.18 hrs, Volume= 0.169 af
Outflow = 0.31 cfs @ 12.71 hrs, Volume= 0.169 af, Atten= 88%, Lag= 32.0 min
Discarded = 0.31 cfs @ 12.71 hrs, Volume= 0.169 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 1L : link
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Pond P3 :
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,642.79' @ 12.71 hrs Surf.Area= 3,738 sf Storage= 3,521 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 122.9 min ( 884.7 - 761.8 )
Volume Invert Avail.Storage Storage Description
#
1 1,641.00' 22,530 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,641.00 500 0 0
1,642.00 1,990 1,245 1,245
1,643.00 4,190 3,090 4,335
1,644.00 6,100 5,145 9,480
1,645.00 20,000 13,050 22,530
Device Routing Invert Outlet Devices
#
1 Primary 1,643.50' 10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,641.00' 3.600 in/hr Exfiltration over Surface area
#3 Secondary 1,643.15' 12.0" Round Culvert
L= 55.0' RCP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 1,643.15' / 1,643.00' S= 0.0027 '/' Cc= 0.900
n= 0.012, Flow Area= 0.79 sf
Discarded OutFlow Max=0.31 cfs @ 12.71 hrs HW=1,642.79' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.31 cfs)
P
rimary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,641.00' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
S
econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,641.00' TW=1,642.00' (Dynamic Tailwater)
3=Culvert ( Controls 0.00 cfs)
Page 166
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 13Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P2:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
Se
condary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
2
1
0
In
flow Area=1.355 ac
Peak Elev=1,642.79'
Storage=3,521 cf
2.51
cfs
0.31
cfs 0.31
cfs
0.00
cfs 0.00
cfs
Page 167
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 14Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P3:
[8
7] Warning: Oscillations may require smaller dt or Finer Routing (severity=113)
Inflow Area = 0.081 ac, 39.52% Impervious, Inflow Depth = 0.79" for 1-Year event
Inflow = 0.08 cfs @ 12.17 hrs, Volume= 0.005 af
Outflow = 0.04 cfs @ 12.31 hrs, Volume= 0.005 af, Atten= 47%, Lag= 8.5 min
Discarded = 0.04 cfs @ 12.31 hrs, Volume= 0.005 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Pond P4 :
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 1L : link
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,642.04' @ 12.31 hrs Surf.Area= 488 sf Storage= 21 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 2.2 min ( 767.2 - 765.0 )
Volume Invert Avail.Storage Storage Description
#
1 1,642.00' 3,820 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,642.00 460 0 0
1,643.00 1,090 775 775
1,644.00 5,000 3,045 3,820
Device Routing Invert Outlet Devices
#
1 Secondary 1,643.50' 10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,642.00' 3.600 in/hr Exfiltration over Surface area
#3 Primary 1,643.00' 5.0' long + 4.0 '/' SideZ x 10.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60
Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64
Discarded OutFlow Max=0.04 cfs @ 12.31 hrs HW=1,642.04' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.04 cfs)
P
rimary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,642.00' TW=1,642.00' (Dynamic Tailwater)
3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
S
econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,642.00' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 168
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 15Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P3:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
Se
condary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.085
0.08
0.075
0.07
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
I
nflow Area=0.081 ac
Peak Elev=1,642.04'
Storage=21 cf
0.08
cfs
0.04
cfs 0.04
cfs
0.00
cfs 0.00
cfs
Page 169
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 16Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P4:
[8
7] Warning: Oscillations may require smaller dt or Finer Routing (severity=113)
Inflow Area = 0.200 ac, 36.70% Impervious, Inflow Depth = 0.41" for 1-Year event
Inflow = 0.10 cfs @ 12.17 hrs, Volume= 0.007 af
Outflow = 0.07 cfs @ 12.26 hrs, Volume= 0.007 af, Atten= 31%, Lag= 5.7 min
Discarded = 0.07 cfs @ 12.26 hrs, Volume= 0.007 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 1L : link
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,642.02' @ 12.26 hrs Surf.Area= 818 sf Storage= 13 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 0.7 min ( 765.7 - 765.0 )
Volume Invert Avail.Storage Storage Description
#
1 1,642.00' 4,800 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,642.00 800 0 0
1,643.00 1,900 1,350 1,350
1,644.00 5,000 3,450 4,800
Device Routing Invert Outlet Devices
#
1 Primary 1,643.50' 10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,642.00' 3.600 in/hr Exfiltration over Surface area
Discarded OutFlow Max=0.07 cfs @ 12.26 hrs HW=1,642.02' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.07 cfs)
P
rimary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,642.00' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 170
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 17Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P4:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.11
0.105
0.1
0.095
0.09
0.085
0.08
0.075
0.07
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
In
flow Area=0.200 ac
Peak Elev=1,642.02'
Storage=13 cf
0.10
cfs
0.07
cfs 0.07
cfs
0.00
cfs
Page 171
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 18Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Link 1L: link
In
flow Area = 1.555 ac, 76.32% Impervious, Inflow Depth = 0.00" for 1-Year event
Inflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
L
ink 1L: link
I
nflow
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
In
flow Area=1.555 ac
0.00
cfs 0.00
cfs
Page 172
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 19Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
T
ime span=0.00-40.00 hrs, dt=0.05 hrs, 801 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Run
off Area=18,312 sf 90.12% Impervious Runoff Depth=2.10"S
ubcatchment D1: D1
T
c=10.0 min CN=WQ Runoff=1.05 cfs 0.074 af
Runoff Area=40,724 sf 78.59% Impervious Runoff Depth=1.83"S
ubcatchment D2: D2
T
c=10.0 min CN=WQ Runoff=2.04 cfs 0.143 af
Runoff Area=3,535 sf 39.52% Impervious Runoff Depth=0.92"S
ubcatchment D3: D3
T
c=10.0 min CN=WQ Runoff=0.09 cfs 0.006 af
Runoff Area=5,176 sf 34.78% Impervious Runoff Depth=0.81"S
ubcatchment D4: D4
T
c=10.0 min CN=WQ Runoff=0.11 cfs 0.008 af
Peak Elev=1,643.02' Storage=201 cf Inflow=1.05 cfs 0.074 afP
ond P1:
D
iscarded=0.03 cfs 0.018 af Primary=0.88 cfs 0.056 af Secondary=0.00 cfs 0.000 af Outflow=0.91 cfs 0.074 af
Peak Elev=1,642.96' Storage=4,176 cf Inflow=2.87 cfs 0.198 afP
ond P2:
D
iscarded=0.34 cfs 0.199 af Primary=0.00 cfs 0.000 af Secondary=0.00 cfs 0.000 af Outflow=0.34 cfs 0.199 af
Peak Elev=1,642.06' Storage=30 cf Inflow=0.09 cfs 0.006 afP
ond P3:
D
iscarded=0.04 cfs 0.006 af Primary=0.00 cfs 0.000 af Secondary=0.00 cfs 0.000 af Outflow=0.04 cfs 0.006 af
Peak Elev=1,642.03' Storage=23 cf Inflow=0.11 cfs 0.008 afP
ond P4:
D
iscarded=0.07 cfs 0.008 af Primary=0.00 cfs 0.000 af Outflow=0.07 cfs 0.008 af
Inflow=0.00 cfs 0.000 afL
ink 1L: link
Pr
imary=0.00 cfs 0.000 af
T
otal Runoff Area = 1.555 ac Runoff Volume = 0.231 af Average Runoff Depth = 1.78"
23.68% Pervious = 0.368 ac 76.32% Impervious = 1.187 ac
Page 173
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 20Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D1: D1
R
unoff = 1.05 cfs @ 12.17 hrs, Volume= 0.074 af, Depth= 2.10"
Routed to Pond P1 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 2-Year Rainfall=2.56"
Area (sf) CN Description
* 4
,776 98 parking lot
* 11,687 98 building
* 40 98 basin
1,809 39 >75% Grass cover, Good, HSG A
1
8,312 Weighted Average
1,809 9.88% Pervious Area
16,503 90.12% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, minimum
S
ubcatchment D1: D1
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
M
SE 24-hr 4
2-Year Rainfall=2.56"
Runoff Area=18,312 sf
Runoff Volume=0.074 af
Runoff Depth=2.10"
Tc=10.0 min
CN=WQ
1.05
cfs
Page 174
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 21Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D2: D2
R
unoff = 2.04 cfs @ 12.17 hrs, Volume= 0.143 af, Depth= 1.83"
Routed to Pond P2 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 2-Year Rainfall=2.56"
Area (sf) CN Description
* 6
30 98 basin
* 16,865 98 parking lot
8,720 39 >75% Grass cover, Good, HSG A
* 14,509 98 building
4
0,724 Weighted Average
8,720 21.41% Pervious Area
32,004 78.59% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, minimum
S
ubcatchment D2: D2
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
2
1
0
M
SE 24-hr 4
2-Year Rainfall=2.56"
Runoff Area=40,724 sf
Runoff Volume=0.143 af
Runoff Depth=1.83"
Tc=10.0 min
CN=WQ
2.04
cfs
Page 175
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 22Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D3: D3
R
unoff = 0.09 cfs @ 12.17 hrs, Volume= 0.006 af, Depth= 0.92"
Routed to Pond P3 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 2-Year Rainfall=2.56"
Area (sf) CN Description
* 3
03 98 parking lot
* 924 98 building
* 170 98 basin
2,138 39 >75% Grass cover, Good, HSG A
3
,535 Weighted Average
2,138 60.48% Pervious Area
1,397 39.52% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, minimum
S
ubcatchment D3: D3
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.095
0.09
0.085
0.08
0.075
0.07
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
MSE
24-hr 4
2-Year Rainfall=2.56"
Runoff Area=3,535 sf
Runoff Volume=0.006 af
Runoff Depth=0.92"
Tc=10.0 min
CN=WQ
0.09
cfs
Page 176
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 23Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D4: D4
R
unoff = 0.11 cfs @ 12.17 hrs, Volume= 0.008 af, Depth= 0.81"
Routed to Pond P4 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 2-Year Rainfall=2.56"
Area (sf) CN Description
* 1
,500 98 building
* 300 98 basin
3,376 39 >75% Grass cover, Good, HSG A
5
,176 Weighted Average
3,376 65.22% Pervious Area
1,800 34.78% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, miminum
S
ubcatchment D4: D4
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.125
0.12
0.115
0.11
0.105
0.1
0.095
0.09
0.085
0.08
0.075
0.07
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
M
SE 24-hr 4
2-Year Rainfall=2.56"
Runoff Area=5,176 sf
Runoff Volume=0.008 af
Runoff Depth=0.81"
Tc=10.0 min
CN=WQ
0.11
cfs
Page 177
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 24Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P1:
In
flow Area = 0.420 ac, 90.12% Impervious, Inflow Depth = 2.10" for 2-Year event
Inflow = 1.05 cfs @ 12.17 hrs, Volume= 0.074 af
Outflow = 0.91 cfs @ 12.22 hrs, Volume= 0.074 af, Atten= 14%, Lag= 3.3 min
Discarded = 0.03 cfs @ 12.22 hrs, Volume= 0.018 af
Primary = 0.88 cfs @ 12.22 hrs, Volume= 0.056 af
Routed to Pond P2 :
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 1L : link
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,643.02' @ 12.22 hrs Surf.Area= 319 sf Storage= 201 cf
Plug-Flow detention time= 20.9 min calculated for 0.073 af (100% of inflow)
Center-of-Mass det. time= 21.0 min ( 783.0 - 762.0 )
Volume Invert Avail.Storage Storage Description
#
1 1,641.00' 11,161 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,641.00 1 0 0
1,642.00 40 21 21
1,643.00 310 175 196
1,644.00 810 560 756
1,645.00 20,000 10,405 11,161
Device Routing Invert Outlet Devices
#
1 Secondary 1,644.00' 5.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,641.00' 3.600 in/hr Exfiltration over Surface area
#3 Primary 1,642.15' 8.0" Round Culvert
L= 55.0' RCP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 1,642.15' / 1,642.00' S= 0.0027 '/' Cc= 0.900
n= 0.012, Flow Area= 0.35 sf
Discarded OutFlow Max=0.03 cfs @ 12.22 hrs HW=1,643.01' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.03 cfs)
P
rimary OutFlow Max=0.87 cfs @ 12.22 hrs HW=1,643.01' TW=1,642.65' (Dynamic Tailwater)
3=Culvert (Outlet Controls 0.87 cfs @ 2.52 fps)
S
econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,641.00' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 178
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 25Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P1:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
Se
condary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
In
flow Area=0.420 ac
Peak Elev=1,643.02'
Storage=201 cf
1.05
cfs
0.91
cfs
0.03
cfs
0.88
cfs
0.00
cfs
Page 179
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 26Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P2:
[8
7] Warning: Oscillations may require smaller dt or Finer Routing (severity=16)
Inflow Area = 1.355 ac, 82.17% Impervious, Inflow Depth = 1.76" for 2-Year event
Inflow = 2.87 cfs @ 12.18 hrs, Volume= 0.198 af
Outflow = 0.34 cfs @ 12.74 hrs, Volume= 0.199 af, Atten= 88%, Lag= 33.9 min
Discarded = 0.34 cfs @ 12.74 hrs, Volume= 0.199 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 1L : link
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Pond P3 :
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,642.96' @ 12.74 hrs Surf.Area= 4,105 sf Storage= 4,176 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 133.7 min ( 893.6 - 759.9 )
Volume Invert Avail.Storage Storage Description
#
1 1,641.00' 22,530 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,641.00 500 0 0
1,642.00 1,990 1,245 1,245
1,643.00 4,190 3,090 4,335
1,644.00 6,100 5,145 9,480
1,645.00 20,000 13,050 22,530
Device Routing Invert Outlet Devices
#
1 Primary 1,643.50' 10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,641.00' 3.600 in/hr Exfiltration over Surface area
#3 Secondary 1,643.15' 12.0" Round Culvert
L= 55.0' RCP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 1,643.15' / 1,643.00' S= 0.0027 '/' Cc= 0.900
n= 0.012, Flow Area= 0.79 sf
Discarded OutFlow Max=0.34 cfs @ 12.74 hrs HW=1,642.96' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.34 cfs)
P
rimary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,641.00' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
S
econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,641.00' TW=1,642.00' (Dynamic Tailwater)
3=Culvert ( Controls 0.00 cfs)
Page 180
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 27Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P2:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
Se
condary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
3
2
1
0
In
flow Area=1.355 ac
Peak Elev=1,642.96'
Storage=4,176 cf
2.87
cfs
0.34
cfs 0.34
cfs
0.00
cfs 0.00
cfs
Page 181
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 28Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P3:
[8
7] Warning: Oscillations may require smaller dt or Finer Routing (severity=112)
Inflow Area = 0.081 ac, 39.52% Impervious, Inflow Depth = 0.92" for 2-Year event
Inflow = 0.09 cfs @ 12.17 hrs, Volume= 0.006 af
Outflow = 0.04 cfs @ 12.33 hrs, Volume= 0.006 af, Atten= 53%, Lag= 9.8 min
Discarded = 0.04 cfs @ 12.33 hrs, Volume= 0.006 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Pond P4 :
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 1L : link
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,642.06' @ 12.33 hrs Surf.Area= 500 sf Storage= 30 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 3.3 min ( 765.2 - 762.0 )
Volume Invert Avail.Storage Storage Description
#
1 1,642.00' 3,820 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,642.00 460 0 0
1,643.00 1,090 775 775
1,644.00 5,000 3,045 3,820
Device Routing Invert Outlet Devices
#
1 Secondary 1,643.50' 10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,642.00' 3.600 in/hr Exfiltration over Surface area
#3 Primary 1,643.00' 5.0' long + 4.0 '/' SideZ x 10.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60
Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64
Discarded OutFlow Max=0.04 cfs @ 12.33 hrs HW=1,642.06' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.04 cfs)
P
rimary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,642.00' TW=1,642.00' (Dynamic Tailwater)
3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
S
econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,642.00' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 182
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 29Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P3:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
Se
condary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.095
0.09
0.085
0.08
0.075
0.07
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
I
nflow Area=0.081 ac
Peak Elev=1,642.06'
Storage=30 cf
0.09
cfs
0.04
cfs 0.04
cfs
0.00
cfs 0.00
cfs
Page 183
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 30Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P4:
[8
7] Warning: Oscillations may require smaller dt or Finer Routing (severity=114)
Inflow Area = 0.200 ac, 36.70% Impervious, Inflow Depth = 0.48" for 2-Year event
Inflow = 0.11 cfs @ 12.17 hrs, Volume= 0.008 af
Outflow = 0.07 cfs @ 12.29 hrs, Volume= 0.008 af, Atten= 40%, Lag= 7.1 min
Discarded = 0.07 cfs @ 12.29 hrs, Volume= 0.008 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 1L : link
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,642.03' @ 12.29 hrs Surf.Area= 830 sf Storage= 23 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 1.5 min ( 763.4 - 762.0 )
Volume Invert Avail.Storage Storage Description
#
1 1,642.00' 4,800 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,642.00 800 0 0
1,643.00 1,900 1,350 1,350
1,644.00 5,000 3,450 4,800
Device Routing Invert Outlet Devices
#
1 Primary 1,643.50' 10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,642.00' 3.600 in/hr Exfiltration over Surface area
Discarded OutFlow Max=0.07 cfs @ 12.29 hrs HW=1,642.03' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.07 cfs)
P
rimary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,642.00' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 184
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 31Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P4:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.125
0.12
0.115
0.11
0.105
0.1
0.095
0.09
0.085
0.08
0.075
0.07
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
In
flow Area=0.200 ac
Peak Elev=1,642.03'
Storage=23 cf
0.11
cfs
0.07
cfs 0.07
cfs
0.00
cfs
Page 185
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 32Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Link 1L: link
In
flow Area = 1.555 ac, 76.32% Impervious, Inflow Depth = 0.00" for 2-Year event
Inflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
L
ink 1L: link
I
nflow
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
In
flow Area=1.555 ac
0.00
cfs 0.00
cfs
Page 186
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 33Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
T
ime span=0.00-40.00 hrs, dt=0.05 hrs, 801 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Run
off Area=18,312 sf 90.12% Impervious Runoff Depth=3.21"S
ubcatchment D1: D1
T
c=10.0 min CN=WQ Runoff=1.57 cfs 0.112 af
Runoff Area=40,724 sf 78.59% Impervious Runoff Depth=2.80"S
ubcatchment D2: D2
T
c=10.0 min CN=WQ Runoff=3.05 cfs 0.218 af
Runoff Area=3,535 sf 39.52% Impervious Runoff Depth=1.42"S
ubcatchment D3: D3
T
c=10.0 min CN=WQ Runoff=0.13 cfs 0.010 af
Runoff Area=5,176 sf 34.78% Impervious Runoff Depth=1.25"S
ubcatchment D4: D4
T
c=10.0 min CN=WQ Runoff=0.17 cfs 0.012 af
Peak Elev=1,643.52' Storage=425 cf Inflow=1.57 cfs 0.112 afP
ond P1:
D
iscarded=0.05 cfs 0.026 af Primary=1.02 cfs 0.087 af Secondary=0.00 cfs 0.000 af Outflow=1.07 cfs 0.112 af
Peak Elev=1,643.44' Storage=6,364 cf Inflow=4.07 cfs 0.305 afP
ond P2:
D
iscarded=0.42 cfs 0.287 af Primary=0.00 cfs 0.000 af Secondary=0.21 cfs 0.018 af Outflow=0.63 cfs 0.305 af
Peak Elev=1,642.77' Storage=538 cf Inflow=0.23 cfs 0.027 afP
ond P3:
D
iscarded=0.08 cfs 0.027 af Primary=0.00 cfs 0.000 af Secondary=0.00 cfs 0.000 af Outflow=0.08 cfs 0.027 af
Peak Elev=1,642.08' Storage=67 cf Inflow=0.17 cfs 0.012 afP
ond P4:
D
iscarded=0.07 cfs 0.013 af Primary=0.00 cfs 0.000 af Outflow=0.07 cfs 0.013 af
Inflow=0.00 cfs 0.000 afL
ink 1L: link
Pr
imary=0.00 cfs 0.000 af
T
otal Runoff Area = 1.555 ac Runoff Volume = 0.353 af Average Runoff Depth = 2.72"
23.68% Pervious = 0.368 ac 76.32% Impervious = 1.187 ac
Page 187
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 34Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D1: D1
R
unoff = 1.57 cfs @ 12.17 hrs, Volume= 0.112 af, Depth= 3.21"
Routed to Pond P1 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 10-Year Rainfall=3.79"
Area (sf) CN Description
* 4
,776 98 parking lot
* 11,687 98 building
* 40 98 basin
1,809 39 >75% Grass cover, Good, HSG A
1
8,312 Weighted Average
1,809 9.88% Pervious Area
16,503 90.12% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, minimum
S
ubcatchment D1: D1
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
M
SE 24-hr 4
10-Year Rainfall=3.79"
Runoff Area=18,312 sf
Runoff Volume=0.112 af
Runoff Depth=3.21"
Tc=10.0 min
CN=WQ
1.57
cfs
Page 188
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 35Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D2: D2
R
unoff = 3.05 cfs @ 12.17 hrs, Volume= 0.218 af, Depth= 2.80"
Routed to Pond P2 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 10-Year Rainfall=3.79"
Area (sf) CN Description
* 6
30 98 basin
* 16,865 98 parking lot
8,720 39 >75% Grass cover, Good, HSG A
* 14,509 98 building
4
0,724 Weighted Average
8,720 21.41% Pervious Area
32,004 78.59% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, minimum
S
ubcatchment D2: D2
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
3
2
1
0
M
SE 24-hr 4
10-Year Rainfall=3.79"
Runoff Area=40,724 sf
Runoff Volume=0.218 af
Runoff Depth=2.80"
Tc=10.0 min
CN=WQ
3.05
cfs
Page 189
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 36Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D3: D3
R
unoff = 0.13 cfs @ 12.17 hrs, Volume= 0.010 af, Depth= 1.42"
Routed to Pond P3 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 10-Year Rainfall=3.79"
Area (sf) CN Description
* 3
03 98 parking lot
* 924 98 building
* 170 98 basin
2,138 39 >75% Grass cover, Good, HSG A
3
,535 Weighted Average
2,138 60.48% Pervious Area
1,397 39.52% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, minimum
S
ubcatchment D3: D3
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
M
SE 24-hr 4
10-Year Rainfall=3.79"
Runoff Area=3,535 sf
Runoff Volume=0.010 af
Runoff Depth=1.42"
Tc=10.0 min
CN=WQ
0.13
cfs
Page 190
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 37Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D4: D4
R
unoff = 0.17 cfs @ 12.17 hrs, Volume= 0.012 af, Depth= 1.25"
Routed to Pond P4 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 10-Year Rainfall=3.79"
Area (sf) CN Description
* 1
,500 98 building
* 300 98 basin
3,376 39 >75% Grass cover, Good, HSG A
5
,176 Weighted Average
3,376 65.22% Pervious Area
1,800 34.78% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, miminum
S
ubcatchment D4: D4
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.19
0.18
0.17
0.16
0.15
0.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
M
SE 24-hr 4
10-Year Rainfall=3.79"
Runoff Area=5,176 sf
Runoff Volume=0.012 af
Runoff Depth=1.25"
Tc=10.0 min
CN=WQ
0.17
cfs
Page 191
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 38Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P1:
In
flow Area = 0.420 ac, 90.12% Impervious, Inflow Depth = 3.21" for 10-Year event
Inflow = 1.57 cfs @ 12.17 hrs, Volume= 0.112 af
Outflow = 1.07 cfs @ 12.19 hrs, Volume= 0.112 af, Atten= 32%, Lag= 1.4 min
Discarded = 0.05 cfs @ 12.30 hrs, Volume= 0.026 af
Primary = 1.02 cfs @ 12.19 hrs, Volume= 0.087 af
Routed to Pond P2 :
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 1L : link
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,643.52' @ 12.30 hrs Surf.Area= 570 sf Storage= 425 cf
Plug-Flow detention time= 23.6 min calculated for 0.112 af (100% of inflow)
Center-of-Mass det. time= 23.8 min ( 778.7 - 754.9 )
Volume Invert Avail.Storage Storage Description
#
1 1,641.00' 11,161 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,641.00 1 0 0
1,642.00 40 21 21
1,643.00 310 175 196
1,644.00 810 560 756
1,645.00 20,000 10,405 11,161
Device Routing Invert Outlet Devices
#
1 Secondary 1,644.00' 5.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,641.00' 3.600 in/hr Exfiltration over Surface area
#3 Primary 1,642.15' 8.0" Round Culvert
L= 55.0' RCP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 1,642.15' / 1,642.00' S= 0.0027 '/' Cc= 0.900
n= 0.012, Flow Area= 0.35 sf
Discarded OutFlow Max=0.05 cfs @ 12.30 hrs HW=1,643.52' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.05 cfs)
P
rimary OutFlow Max=0.85 cfs @ 12.19 hrs HW=1,643.36' TW=1,642.99' (Dynamic Tailwater)
3=Culvert (Outlet Controls 0.85 cfs @ 2.43 fps)
S
econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,641.00' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 192
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 39Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P1:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
Se
condary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
In
flow Area=0.420 ac
Peak Elev=1,643.52'
Storage=425 cf
1.57
cfs
1.07
cfs
0.05
cfs
1.02
cfs
0.00
cfs
Page 193
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 40Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P2:
In
flow Area = 1.355 ac, 82.17% Impervious, Inflow Depth = 2.70" for 10-Year event
Inflow = 4.07 cfs @ 12.17 hrs, Volume= 0.305 af
Outflow = 0.63 cfs @ 12.65 hrs, Volume= 0.305 af, Atten= 84%, Lag= 28.5 min
Discarded = 0.42 cfs @ 12.65 hrs, Volume= 0.287 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 1L : link
Secondary = 0.21 cfs @ 12.65 hrs, Volume= 0.018 af
Routed to Pond P3 :
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,643.44' @ 12.65 hrs Surf.Area= 5,031 sf Storage= 6,364 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 152.6 min ( 908.0 - 755.4 )
Volume Invert Avail.Storage Storage Description
#
1 1,641.00' 22,530 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,641.00 500 0 0
1,642.00 1,990 1,245 1,245
1,643.00 4,190 3,090 4,335
1,644.00 6,100 5,145 9,480
1,645.00 20,000 13,050 22,530
Device Routing Invert Outlet Devices
#
1 Primary 1,643.50' 10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,641.00' 3.600 in/hr Exfiltration over Surface area
#3 Secondary 1,643.15' 12.0" Round Culvert
L= 55.0' RCP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 1,643.15' / 1,643.00' S= 0.0027 '/' Cc= 0.900
n= 0.012, Flow Area= 0.79 sf
Discarded OutFlow Max=0.42 cfs @ 12.65 hrs HW=1,643.44' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.42 cfs)
P
rimary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,641.00' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
S
econdary OutFlow Max=0.21 cfs @ 12.65 hrs HW=1,643.44' TW=1,642.41' (Dynamic Tailwater)
3=Culvert (Barrel Controls 0.21 cfs @ 1.69 fps)
Page 194
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 41Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P2:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
Se
condary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
4
3
2
1
0
In
flow Area=1.355 ac
Peak Elev=1,643.44'
Storage=6,364 cf
4.07
cfs
0.63
cfs
0.42
cfs
0.00
cfs
0.21
cfs
Page 195
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 42Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P3:
[8
7] Warning: Oscillations may require smaller dt or Finer Routing (severity=72)
Inflow Area = 0.081 ac, 39.52% Impervious, Inflow Depth = 4.04" for 10-Year event
Inflow = 0.23 cfs @ 12.61 hrs, Volume= 0.027 af
Outflow = 0.08 cfs @ 13.60 hrs, Volume= 0.027 af, Atten= 66%, Lag= 59.1 min
Discarded = 0.08 cfs @ 13.60 hrs, Volume= 0.027 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Pond P4 :
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 1L : link
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,642.77' @ 13.60 hrs Surf.Area= 943 sf Storage= 538 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 64.8 min ( 836.6 - 771.8 )
Volume Invert Avail.Storage Storage Description
#
1 1,642.00' 3,820 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,642.00 460 0 0
1,643.00 1,090 775 775
1,644.00 5,000 3,045 3,820
Device Routing Invert Outlet Devices
#
1 Secondary 1,643.50' 10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,642.00' 3.600 in/hr Exfiltration over Surface area
#3 Primary 1,643.00' 5.0' long + 4.0 '/' SideZ x 10.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60
Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64
Discarded OutFlow Max=0.08 cfs @ 13.60 hrs HW=1,642.77' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.08 cfs)
P
rimary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,642.00' TW=1,642.00' (Dynamic Tailwater)
3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
S
econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,642.00' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 196
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 43Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P3:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
Se
condary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.26
0.25
0.24
0.23
0.22
0.21
0.2
0.19
0.18
0.17
0.16
0.15
0.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
I
nflow Area=0.081 ac
Peak Elev=1,642.77'
Storage=538 cf
0.23
cfs
0.08
cfs 0.08
cfs
0.00
cfs 0.00
cfs
Page 197
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 44Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P4:
[8
7] Warning: Oscillations may require smaller dt or Finer Routing (severity=111)
Inflow Area = 0.200 ac, 36.70% Impervious, Inflow Depth = 0.75" for 10-Year event
Inflow = 0.17 cfs @ 12.17 hrs, Volume= 0.012 af
Outflow = 0.07 cfs @ 12.35 hrs, Volume= 0.013 af, Atten= 57%, Lag= 10.8 min
Discarded = 0.07 cfs @ 12.35 hrs, Volume= 0.013 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 1L : link
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,642.08' @ 12.35 hrs Surf.Area= 888 sf Storage= 67 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 4.1 min ( 763.9 - 759.8 )
Volume Invert Avail.Storage Storage Description
#
1 1,642.00' 4,800 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,642.00 800 0 0
1,643.00 1,900 1,350 1,350
1,644.00 5,000 3,450 4,800
Device Routing Invert Outlet Devices
#
1 Primary 1,643.50' 10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,642.00' 3.600 in/hr Exfiltration over Surface area
Discarded OutFlow Max=0.07 cfs @ 12.35 hrs HW=1,642.08' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.07 cfs)
P
rimary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,642.00' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 198
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 45Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P4:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.19
0.18
0.17
0.16
0.15
0.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
In
flow Area=0.200 ac
Peak Elev=1,642.08'
Storage=67 cf
0.17
cfs
0.07
cfs 0.07
cfs
0.00
cfs
Page 199
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 46Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Link 1L: link
In
flow Area = 1.555 ac, 76.32% Impervious, Inflow Depth = 0.00" for 10-Year event
Inflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
L
ink 1L: link
I
nflow
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
In
flow Area=1.555 ac
0.00
cfs 0.00
cfs
Page 200
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 47Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
T
ime span=0.00-40.00 hrs, dt=0.05 hrs, 801 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Run
off Area=18,312 sf 90.12% Impervious Runoff Depth=5.64"S
ubcatchment D1: D1
T
c=10.0 min CN=WQ Runoff=2.69 cfs 0.197 af
Runoff Area=40,724 sf 78.59% Impervious Runoff Depth=4.99"S
ubcatchment D2: D2
T
c=10.0 min CN=WQ Runoff=5.25 cfs 0.389 af
Runoff Area=3,535 sf 39.52% Impervious Runoff Depth=2.79"S
ubcatchment D3: D3
T
c=10.0 min CN=WQ Runoff=0.24 cfs 0.019 af
Runoff Area=5,176 sf 34.78% Impervious Runoff Depth=2.53"S
ubcatchment D4: D4
T
c=10.0 min CN=WQ Runoff=0.31 cfs 0.025 af
Peak Elev=1,644.13' Storage=1,035 cf Inflow=2.69 cfs 0.197 afP
ond P1:
D
iscarded=0.28 cfs 0.037 af Primary=1.14 cfs 0.149 af Secondary=0.71 cfs 0.011 af Outflow=1.94 cfs 0.197 af
Peak Elev=1,643.73' Storage=7,916 cf Inflow=6.38 cfs 0.538 afP
ond P2:
D
iscarded=0.47 cfs 0.380 af Primary=3.23 cfs 0.091 af Secondary=0.81 cfs 0.066 af Outflow=4.50 cfs 0.538 af
Peak Elev=1,643.11' Storage=921 cf Inflow=0.98 cfs 0.085 afP
ond P3:
D
iscarded=0.13 cfs 0.049 af Primary=0.50 cfs 0.036 af Secondary=0.00 cfs 0.000 af Outflow=0.63 cfs 0.085 af
Peak Elev=1,642.92' Storage=1,196 cf Inflow=0.58 cfs 0.061 afP
ond P4:
D
iscarded=0.15 cfs 0.061 af Primary=0.00 cfs 0.000 af Outflow=0.15 cfs 0.061 af
Inflow=3.94 cfs 0.103 afL
ink 1L: link
Pr
imary=3.94 cfs 0.103 af
T
otal Runoff Area = 1.555 ac Runoff Volume = 0.630 af Average Runoff Depth = 4.86"
23.68% Pervious = 0.368 ac 76.32% Impervious = 1.187 ac
Page 201
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 48Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D1: D1
R
unoff = 2.69 cfs @ 12.17 hrs, Volume= 0.197 af, Depth= 5.64"
Routed to Pond P1 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 100-Year Rainfall=6.43"
Area (sf) CN Description
* 4
,776 98 parking lot
* 11,687 98 building
* 40 98 basin
1,809 39 >75% Grass cover, Good, HSG A
1
8,312 Weighted Average
1,809 9.88% Pervious Area
16,503 90.12% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, minimum
S
ubcatchment D1: D1
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
3
2
1
0
M
SE 24-hr 4
100-Year Rainfall=6.43"
Runoff Area=18,312 sf
Runoff Volume=0.197 af
Runoff Depth=5.64"
Tc=10.0 min
CN=WQ
2.69
cfs
Page 202
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 49Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D2: D2
R
unoff = 5.25 cfs @ 12.17 hrs, Volume= 0.389 af, Depth= 4.99"
Routed to Pond P2 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 100-Year Rainfall=6.43"
Area (sf) CN Description
* 6
30 98 basin
* 16,865 98 parking lot
8,720 39 >75% Grass cover, Good, HSG A
* 14,509 98 building
4
0,724 Weighted Average
8,720 21.41% Pervious Area
32,004 78.59% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, minimum
S
ubcatchment D2: D2
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
5
4
3
2
1
0
M
SE 24-hr 4
100-Year Rainfall=6.43"
Runoff Area=40,724 sf
Runoff Volume=0.389 af
Runoff Depth=4.99"
Tc=10.0 min
CN=WQ
5.25
cfs
Page 203
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 50Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D3: D3
R
unoff = 0.24 cfs @ 12.18 hrs, Volume= 0.019 af, Depth= 2.79"
Routed to Pond P3 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 100-Year Rainfall=6.43"
Area (sf) CN Description
* 3
03 98 parking lot
* 924 98 building
* 170 98 basin
2,138 39 >75% Grass cover, Good, HSG A
3
,535 Weighted Average
2,138 60.48% Pervious Area
1,397 39.52% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, minimum
S
ubcatchment D3: D3
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.26
0.25
0.24
0.23
0.22
0.21
0.2
0.19
0.18
0.17
0.16
0.15
0.14
0.13
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
M
SE 24-hr 4
100-Year Rainfall=6.43"
Runoff Area=3,535 sf
Runoff Volume=0.019 af
Runoff Depth=2.79"
Tc=10.0 min
CN=WQ
0.24
cfs
Page 204
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 51Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D4: D4
R
unoff = 0.31 cfs @ 12.18 hrs, Volume= 0.025 af, Depth= 2.53"
Routed to Pond P4 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 100-Year Rainfall=6.43"
Area (sf) CN Description
* 1
,500 98 building
* 300 98 basin
3,376 39 >75% Grass cover, Good, HSG A
5
,176 Weighted Average
3,376 65.22% Pervious Area
1,800 34.78% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, miminum
S
ubcatchment D4: D4
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.34
0.32
0.3
0.28
0.26
0.24
0.22
0.2
0.18
0.16
0.14
0.12
0.1
0.08
0.06
0.04
0.02
0
M
SE 24-hr 4
100-Year Rainfall=6.43"
Runoff Area=5,176 sf
Runoff Volume=0.025 af
Runoff Depth=2.53"
Tc=10.0 min
CN=WQ
0.31
cfs
Page 205
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 52Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P1:
In
flow Area = 0.420 ac, 90.12% Impervious, Inflow Depth = 5.64" for 100-Year event
Inflow = 2.69 cfs @ 12.17 hrs, Volume= 0.197 af
Outflow = 1.94 cfs @ 12.25 hrs, Volume= 0.197 af, Atten= 28%, Lag= 4.7 min
Discarded = 0.28 cfs @ 12.26 hrs, Volume= 0.037 af
Primary = 1.14 cfs @ 12.16 hrs, Volume= 0.149 af
Routed to Pond P2 :
Secondary = 0.71 cfs @ 12.26 hrs, Volume= 0.011 af
Routed to Link 1L : link
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,644.13' @ 12.26 hrs Surf.Area= 3,373 sf Storage= 1,035 cf
Plug-Flow detention time= 19.5 min calculated for 0.197 af (100% of inflow)
Center-of-Mass det. time= 19.7 min ( 768.1 - 748.5 )
Volume Invert Avail.Storage Storage Description
#
1 1,641.00' 11,161 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,641.00 1 0 0
1,642.00 40 21 21
1,643.00 310 175 196
1,644.00 810 560 756
1,645.00 20,000 10,405 11,161
Device Routing Invert Outlet Devices
#
1 Secondary 1,644.00' 5.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,641.00' 3.600 in/hr Exfiltration over Surface area
#3 Primary 1,642.15' 8.0" Round Culvert
L= 55.0' RCP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 1,642.15' / 1,642.00' S= 0.0027 '/' Cc= 0.900
n= 0.012, Flow Area= 0.35 sf
Discarded OutFlow Max=0.28 cfs @ 12.26 hrs HW=1,644.13' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.28 cfs)
P
rimary OutFlow Max=0.97 cfs @ 12.16 hrs HW=1,644.02' TW=1,643.54' (Dynamic Tailwater)
3=Culvert (Outlet Controls 0.97 cfs @ 2.77 fps)
S
econdary OutFlow Max=0.69 cfs @ 12.26 hrs HW=1,644.13' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir (Weir Controls 0.69 cfs @ 0.95 fps)
Page 206
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 53Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P1:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
Se
condary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
3
2
1
0
In
flow Area=0.420 ac
Peak Elev=1,644.13'
Storage=1,035 cf
2.69
cfs
1.94
cfs
0.28
cfs
1.14
cfs
0.71
cfs
Page 207
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 54Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P2:
In
flow Area = 1.355 ac, 82.17% Impervious, Inflow Depth = 4.76" for 100-Year event
Inflow = 6.38 cfs @ 12.17 hrs, Volume= 0.538 af
Outflow = 4.50 cfs @ 12.27 hrs, Volume= 0.538 af, Atten= 29%, Lag= 6.4 min
Discarded = 0.47 cfs @ 12.27 hrs, Volume= 0.380 af
Primary = 3.23 cfs @ 12.27 hrs, Volume= 0.091 af
Routed to Link 1L : link
Secondary = 0.81 cfs @ 12.27 hrs, Volume= 0.066 af
Routed to Pond P3 :
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,643.73' @ 12.27 hrs Surf.Area= 5,589 sf Storage= 7,916 cf
Plug-Flow detention time= 123.1 min calculated for 0.537 af (100% of inflow)
Center-of-Mass det. time= 123.2 min ( 874.9 - 751.7 )
Volume Invert Avail.Storage Storage Description
#
1 1,641.00' 22,530 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,641.00 500 0 0
1,642.00 1,990 1,245 1,245
1,643.00 4,190 3,090 4,335
1,644.00 6,100 5,145 9,480
1,645.00 20,000 13,050 22,530
Device Routing Invert Outlet Devices
#
1 Primary 1,643.50' 10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,641.00' 3.600 in/hr Exfiltration over Surface area
#3 Secondary 1,643.15' 12.0" Round Culvert
L= 55.0' RCP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 1,643.15' / 1,643.00' S= 0.0027 '/' Cc= 0.900
n= 0.012, Flow Area= 0.79 sf
Discarded OutFlow Max=0.46 cfs @ 12.27 hrs HW=1,643.73' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.46 cfs)
P
rimary OutFlow Max=3.08 cfs @ 12.27 hrs HW=1,643.73' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir (Weir Controls 3.08 cfs @ 1.26 fps)
S
econdary OutFlow Max=0.79 cfs @ 12.27 hrs HW=1,643.73' TW=1,642.71' (Dynamic Tailwater)
3=Culvert (Barrel Controls 0.79 cfs @ 2.44 fps)
Page 208
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 55Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P2:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
Se
condary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
7
6
5
4
3
2
1
0
In
flow Area=1.355 ac
Peak Elev=1,643.73'
Storage=7,916 cf
6.38
cfs
4.50
cfs
0.47
cfs
3.23
cfs
0.81
cfs
Page 209
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 56Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P3:
[8
7] Warning: Oscillations may require smaller dt or Finer Routing (severity=49)
Inflow Area = 0.081 ac, 39.52% Impervious, Inflow Depth = 12.59" for 100-Year event
Inflow = 0.98 cfs @ 12.26 hrs, Volume= 0.085 af
Outflow = 0.63 cfs @ 12.55 hrs, Volume= 0.085 af, Atten= 36%, Lag= 17.2 min
Discarded = 0.13 cfs @ 12.55 hrs, Volume= 0.049 af
Primary = 0.50 cfs @ 12.55 hrs, Volume= 0.036 af
Routed to Pond P4 :
Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 1L : link
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,643.11' @ 12.55 hrs Surf.Area= 1,527 sf Storage= 921 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 54.1 min ( 829.6 - 775.5 )
Volume Invert Avail.Storage Storage Description
#
1 1,642.00' 3,820 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,642.00 460 0 0
1,643.00 1,090 775 775
1,644.00 5,000 3,045 3,820
Device Routing Invert Outlet Devices
#
1 Secondary 1,643.50' 10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,642.00' 3.600 in/hr Exfiltration over Surface area
#3 Primary 1,643.00' 5.0' long + 4.0 '/' SideZ x 10.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60
Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64
Discarded OutFlow Max=0.13 cfs @ 12.55 hrs HW=1,643.11' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.13 cfs)
P
rimary OutFlow Max=0.50 cfs @ 12.55 hrs HW=1,643.11' TW=1,642.42' (Dynamic Tailwater)
3=Broad-Crested Rectangular Weir (Weir Controls 0.50 cfs @ 0.82 fps)
S
econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,642.00' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 210
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 57Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P3:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
Se
condary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
In
flow Area=0.081 ac
Peak Elev=1,643.11'
Storage=921 cf
0.98
cfs
0.63
cfs
0.13
cfs
0.50
cfs
0.00
cfs
Page 211
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 58Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P4:
[8
7] Warning: Oscillations may require smaller dt or Finer Routing (severity=65)
Inflow Area = 0.200 ac, 36.70% Impervious, Inflow Depth = 3.65" for 100-Year event
Inflow = 0.58 cfs @ 12.53 hrs, Volume= 0.061 af
Outflow = 0.15 cfs @ 13.73 hrs, Volume= 0.061 af, Atten= 74%, Lag= 72.3 min
Discarded = 0.15 cfs @ 13.73 hrs, Volume= 0.061 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 1L : link
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,642.92' @ 13.73 hrs Surf.Area= 1,809 sf Storage= 1,196 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 76.0 min ( 853.9 - 777.9 )
Volume Invert Avail.Storage Storage Description
#
1 1,642.00' 4,800 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,642.00 800 0 0
1,643.00 1,900 1,350 1,350
1,644.00 5,000 3,450 4,800
Device Routing Invert Outlet Devices
#
1 Primary 1,643.50' 10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,642.00' 3.600 in/hr Exfiltration over Surface area
Discarded OutFlow Max=0.15 cfs @ 13.73 hrs HW=1,642.92' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.15 cfs)
P
rimary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,642.00' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 212
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 59Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P4:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.6
0.55
0.5
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
In
flow Area=0.200 ac
Peak Elev=1,642.92'
Storage=1,196 cf
0.58
cfs
0.15
cfs 0.15
cfs
0.00
cfs
Page 213
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 60Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Link 1L: link
In
flow Area = 1.555 ac, 76.32% Impervious, Inflow Depth = 0.79" for 100-Year event
Inflow = 3.94 cfs @ 12.27 hrs, Volume= 0.103 af
Primary = 3.94 cfs @ 12.27 hrs, Volume= 0.103 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
L
ink 1L: link
I
nflow
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
4
3
2
1
0
In
flow Area=1.555 ac
3.94
cfs 3.94
cfs
Page 214
T
able of Contents2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
T
ABLE OF CONTENTS
Project Reports
1
Routing Diagram
2 Rainfall Events Listing
3 Area Listing (all nodes)
4 Pipe Listing (all nodes)
1-Year Event
5
Node Listing
6 Subcat D1: D1
7 Subcat D2: D2
8 Subcat D3: D3
9 Subcat D4: D4
10 Pond P1:
12 Pond P2:
14 Pond P3:
16 Pond P4:
18 Link 1L: link
2-Year Event
1
9 Node Listing
20 Subcat D1: D1
21 Subcat D2: D2
22 Subcat D3: D3
23 Subcat D4: D4
24 Pond P1:
26 Pond P2:
28 Pond P3:
30 Pond P4:
32 Link 1L: link
10-Year Event
3
3 Node Listing
34 Subcat D1: D1
35 Subcat D2: D2
36 Subcat D3: D3
37 Subcat D4: D4
38 Pond P1:
40 Pond P2:
42 Pond P3:
44 Pond P4:
46 Link 1L: link
100-Year Event
4
7 Node Listing
48 Subcat D1: D1
49 Subcat D2: D2
Page 215
T
able of Contents2
6-0159 north
P
rinted 5/28/2026Prepared by
Vreeland Associates
Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
5
0 Subcat D3: D3
51 Subcat D4: D4
52 Pond P1:
54 Pond P2:
56 Pond P3:
58 Pond P4:
60 Link 1L: link
Page 216
1S
Runo
ff
D
5
D5
E
1
existi
ng
P
5 2L
of
fsite runoff
4L
no
rth
R
outing Diagram for 26-0159 south
Prepared by Vreeland Associates, Printed 5/28/2026
Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
Subcat Rea
ch Pond L
ink
Page 217
2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 2Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
R
ainfall Events Listing
Event# Event
Nam
e
Storm Type Curve Mode Duration
(hours)
B/B Depth
(inches)
AMC
1 1-
Year MSE 24-hr 4 Default 24.00 1 2.22 2
2 2-Year MSE 24-hr 4 Default 24.00 1 2.56 2
3 10-Year MSE 24-hr 4 Default 24.00 1 3.79 2
4 100-Year MSE 24-hr 4 Default 24.00 1 6.43 2
Page 218
2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 3Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
A
rea Listing (all nodes)
Are
a
(acres)
CN Description
(subcatchment-numbers)
3.277 39 >75%
Grass cover, Good, HSG A (1S, D5, E1)
0.026 98 basin (D5)
0.513 98 building (D5)
0.331 98 pavement (D5)
4.147 51 TOTAL AREA
Page 219
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 4Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
T
ime span=0.00-40.00 hrs, dt=0.05 hrs, 801 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Run
off Area=7,842 sf 0.00% Impervious Runoff Depth=0.00"S
ubcatchment 1S: Runoff
T
c=10.0 min CN=39 Runoff=0.00 cfs 0.000 af
Runoff Area=42,461 sf 89.28% Impervious Runoff Depth=1.78"S
ubcatchment D5: D5
T
c=6.0 min CN=WQ Runoff=2.39 cfs 0.145 af
Runoff Area=2.992 ac 0.00% Impervious Runoff Depth=0.00"S
ubcatchment E1: existing
T
c=10.0 min CN=39 Runoff=0.00 cfs 0.000 af
Peak Elev=1,643.52' Storage=2,764 cf Inflow=2.39 cfs 0.145 afP
ond P5:
D
iscarded=0.21 cfs 0.145 af Primary=0.00 cfs 0.000 af Outflow=0.21 cfs 0.145 af
Inflow=0.00 cfs 0.000 afL
ink 2L: offsite runoff
Pr
imary=0.00 cfs 0.000 af
1-Year Inflow Imported from 26-0159 north~Link 1L.hce Inflow=0.00 cfs 0.000 afL
ink 4L: north
Are
a= 1.555 ac 76.32% Imperv. Primary=0.00 cfs 0.000 af
T
otal Runoff Area = 4.147 ac Runoff Volume = 0.145 af Average Runoff Depth = 0.42"
79.01% Pervious = 3.277 ac 20.99% Impervious = 0.870 ac
Page 220
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 5Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment 1S: Runoff
[4
5] Hint: Runoff=Zero
Runoff = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Depth= 0.00"
Routed to Link 2L : offsite runoff
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 1-Year Rainfall=2.22"
Area (sf) CN Description
7
,842 39 >75% Grass cover, Good, HSG A
7
,842 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, min
S
ubcatchment 1S: Runoff
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
M
SE 24-hr 4
1-Year Rainfall=2.22"
Runoff Area=7,842 sf
Runoff Volume=0.000 af
Runoff Depth=0.00"
Tc=10.0 min
CN=39
0.00
cfs
Page 221
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 6Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D5: D5
R
unoff = 2.39 cfs @ 12.13 hrs, Volume= 0.145 af, Depth= 1.78"
Routed to Pond P5 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 1-Year Rainfall=2.22"
Area (sf) CN Description
* 1
4,424 98 pavement
* 22,344 98 building
* 1,140 98 basin
4,553 39 >75% Grass cover, Good, HSG A
4
2,461 Weighted Average
4,553 10.72% Pervious Area
37,908 89.28% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6
.0 Direct Entry,
S
ubcatchment D5: D5
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
2
1
0
M
SE 24-hr 4
1-Year Rainfall=2.22"
Runoff Area=42,461 sf
Runoff Volume=0.145 af
Runoff Depth=1.78"
Tc=6.0 min
CN=WQ
2.39
cfs
Page 222
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 7Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment E1: existing
[4
5] Hint: Runoff=Zero
Runoff = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Depth= 0.00"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 1-Year Rainfall=2.22"
Area (ac) CN Description
2
.992 39 >75% Grass cover, Good, HSG A
2
.992 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry,
S
ubcatchment E1: existing
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
M
SE 24-hr 4
1-Year Rainfall=2.22"
Runoff Area=2.992 ac
Runoff Volume=0.000 af
Runoff Depth=0.00"
Tc=10.0 min
CN=39
0.00
cfs
Page 223
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 8Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P5:
[8
7] Warning: Oscillations may require smaller dt or Finer Routing (severity=36)
Inflow Area = 0.975 ac, 89.28% Impervious, Inflow Depth = 1.78" for 1-Year event
Inflow = 2.39 cfs @ 12.13 hrs, Volume= 0.145 af
Outflow = 0.21 cfs @ 12.85 hrs, Volume= 0.145 af, Atten= 91%, Lag= 43.7 min
Discarded = 0.21 cfs @ 12.85 hrs, Volume= 0.145 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 2L : offsite runoff
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,643.52' @ 12.85 hrs Surf.Area= 2,530 sf Storage= 2,764 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 118.4 min ( 879.6 - 761.2 )
Volume Invert Avail.Storage Storage Description
#
1 1,642.00' 24,860 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,642.00 1,140 0 0
1,643.00 2,020 1,580 1,580
1,644.00 3,000 2,510 4,090
1,645.00 4,000 3,500 7,590
1,646.00 5,270 4,635 12,225
1,647.00 20,000 12,635 24,860
Device Routing Invert Outlet Devices
#
1 Primary 1,644.75' 10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,642.00' 3.600 in/hr Exfiltration over Surface area
Discarded OutFlow Max=0.21 cfs @ 12.85 hrs HW=1,643.52' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.21 cfs)
P
rimary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,642.00' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 224
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 9Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P5:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
2
1
0
In
flow Area=0.975 ac
Peak Elev=1,643.52'
Storage=2,764 cf
2.39
cfs
0.21
cfs 0.21
cfs
0.00
cfs
Page 225
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 10Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Link 2L: offsite runoff
In
flow Area = 2.710 ac, 75.91% Impervious, Inflow Depth = 0.00" for 1-Year event
Inflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
L
ink 2L: offsite runoff
I
nflow
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
In
flow Area=2.710 ac
0.00
cfs 0.00
cfs
Page 226
M
SE 24-hr 4 1-Year Rainfall=2.22"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 11Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Link 4L: north
In
flow Area = 1.555 ac, 76.32% Impervious, Inflow Depth = 0.00" for 1-Year event
Inflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min
Routed to Link 2L : offsite runoff
Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
1-Year Inflow Imported from 26-0159 north~Link 1L.hce
L
ink 4L: north
I
nflow
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
Inf
low Area=1.555 ac
1-Year Inflow
Imported from
26-0159 north~Link 1L.hce
Area= 1.555 ac
76.32% Imperv.
0.00
cfs 0.00
cfs
Page 227
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 12Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
T
ime span=0.00-40.00 hrs, dt=0.05 hrs, 801 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Run
off Area=7,842 sf 0.00% Impervious Runoff Depth=0.00"S
ubcatchment 1S: Runoff
T
c=10.0 min CN=39 Runoff=0.00 cfs 0.000 af
Runoff Area=42,461 sf 89.28% Impervious Runoff Depth=2.08"S
ubcatchment D5: D5
T
c=6.0 min CN=WQ Runoff=2.77 cfs 0.169 af
Runoff Area=2.992 ac 0.00% Impervious Runoff Depth=0.00"S
ubcatchment E1: existing
T
c=10.0 min CN=39 Runoff=0.00 cfs 0.000 af
Peak Elev=1,643.74' Storage=3,337 cf Inflow=2.77 cfs 0.169 afP
ond P5:
D
iscarded=0.23 cfs 0.169 af Primary=0.00 cfs 0.000 af Outflow=0.23 cfs 0.169 af
Inflow=0.00 cfs 0.000 afL
ink 2L: offsite runoff
Pr
imary=0.00 cfs 0.000 af
2-Year Inflow Imported from 26-0159 north~Link 1L.hce Inflow=0.00 cfs 0.000 afL
ink 4L: north
Are
a= 1.555 ac 76.32% Imperv. Primary=0.00 cfs 0.000 af
T
otal Runoff Area = 4.147 ac Runoff Volume = 0.169 af Average Runoff Depth = 0.49"
79.01% Pervious = 3.277 ac 20.99% Impervious = 0.870 ac
Page 228
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 13Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment 1S: Runoff
[4
5] Hint: Runoff=Zero
Runoff = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Depth= 0.00"
Routed to Link 2L : offsite runoff
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 2-Year Rainfall=2.56"
Area (sf) CN Description
7
,842 39 >75% Grass cover, Good, HSG A
7
,842 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, min
S
ubcatchment 1S: Runoff
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
M
SE 24-hr 4
2-Year Rainfall=2.56"
Runoff Area=7,842 sf
Runoff Volume=0.000 af
Runoff Depth=0.00"
Tc=10.0 min
CN=39
0.00
cfs
Page 229
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 14Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D5: D5
R
unoff = 2.77 cfs @ 12.13 hrs, Volume= 0.169 af, Depth= 2.08"
Routed to Pond P5 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 2-Year Rainfall=2.56"
Area (sf) CN Description
* 1
4,424 98 pavement
* 22,344 98 building
* 1,140 98 basin
4,553 39 >75% Grass cover, Good, HSG A
4
2,461 Weighted Average
4,553 10.72% Pervious Area
37,908 89.28% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6
.0 Direct Entry,
S
ubcatchment D5: D5
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
3
2
1
0
M
SE 24-hr 4
2-Year Rainfall=2.56"
Runoff Area=42,461 sf
Runoff Volume=0.169 af
Runoff Depth=2.08"
Tc=6.0 min
CN=WQ
2.77
cfs
Page 230
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 15Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment E1: existing
[4
5] Hint: Runoff=Zero
Runoff = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Depth= 0.00"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 2-Year Rainfall=2.56"
Area (ac) CN Description
2
.992 39 >75% Grass cover, Good, HSG A
2
.992 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry,
S
ubcatchment E1: existing
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
M
SE 24-hr 4
2-Year Rainfall=2.56"
Runoff Area=2.992 ac
Runoff Volume=0.000 af
Runoff Depth=0.00"
Tc=10.0 min
CN=39
0.00
cfs
Page 231
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 16Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P5:
[8
7] Warning: Oscillations may require smaller dt or Finer Routing (severity=26)
Inflow Area = 0.975 ac, 89.28% Impervious, Inflow Depth = 2.08" for 2-Year event
Inflow = 2.77 cfs @ 12.13 hrs, Volume= 0.169 af
Outflow = 0.23 cfs @ 12.95 hrs, Volume= 0.169 af, Atten= 92%, Lag= 49.5 min
Discarded = 0.23 cfs @ 12.95 hrs, Volume= 0.169 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 2L : offsite runoff
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,643.74' @ 12.95 hrs Surf.Area= 2,743 sf Storage= 3,337 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 135.5 min ( 893.8 - 758.2 )
Volume Invert Avail.Storage Storage Description
#
1 1,642.00' 24,860 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,642.00 1,140 0 0
1,643.00 2,020 1,580 1,580
1,644.00 3,000 2,510 4,090
1,645.00 4,000 3,500 7,590
1,646.00 5,270 4,635 12,225
1,647.00 20,000 12,635 24,860
Device Routing Invert Outlet Devices
#
1 Primary 1,644.75' 10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,642.00' 3.600 in/hr Exfiltration over Surface area
Discarded OutFlow Max=0.23 cfs @ 12.95 hrs HW=1,643.74' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.23 cfs)
P
rimary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,642.00' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 232
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 17Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P5:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
3
2
1
0
In
flow Area=0.975 ac
Peak Elev=1,643.74'
Storage=3,337 cf
2.77
cfs
0.23
cfs 0.23
cfs
0.00
cfs
Page 233
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 18Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Link 2L: offsite runoff
In
flow Area = 2.710 ac, 75.91% Impervious, Inflow Depth = 0.00" for 2-Year event
Inflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
L
ink 2L: offsite runoff
I
nflow
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
In
flow Area=2.710 ac
0.00
cfs 0.00
cfs
Page 234
M
SE 24-hr 4 2-Year Rainfall=2.56"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 19Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Link 4L: north
In
flow Area = 1.555 ac, 76.32% Impervious, Inflow Depth = 0.00" for 2-Year event
Inflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min
Routed to Link 2L : offsite runoff
Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
2-Year Inflow Imported from 26-0159 north~Link 1L.hce
L
ink 4L: north
I
nflow
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
Inf
low Area=1.555 ac
2-Year Inflow
Imported from
26-0159 north~Link 1L.hce
Area= 1.555 ac
76.32% Imperv.
0.00
cfs 0.00
cfs
Page 235
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 20Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
T
ime span=0.00-40.00 hrs, dt=0.05 hrs, 801 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Run
off Area=7,842 sf 0.00% Impervious Runoff Depth=0.03"S
ubcatchment 1S: Runoff
T
c=10.0 min CN=39 Runoff=0.00 cfs 0.000 af
Runoff Area=42,461 sf 89.28% Impervious Runoff Depth=3.18"S
ubcatchment D5: D5
T
c=6.0 min CN=WQ Runoff=4.14 cfs 0.258 af
Runoff Area=2.992 ac 0.00% Impervious Runoff Depth=0.03"S
ubcatchment E1: existing
T
c=10.0 min CN=39 Runoff=0.01 cfs 0.007 af
Peak Elev=1,644.45' Storage=5,531 cf Inflow=4.14 cfs 0.258 afP
ond P5:
D
iscarded=0.29 cfs 0.258 af Primary=0.00 cfs 0.000 af Outflow=0.29 cfs 0.258 af
Inflow=0.00 cfs 0.000 afL
ink 2L: offsite runoff
Pr
imary=0.00 cfs 0.000 af
10-Year Inflow Imported from 26-0159 north~Link 1L.hce Inflow=0.00 cfs 0.000 afL
ink 4L: north
Are
a= 1.555 ac 76.32% Imperv. Primary=0.00 cfs 0.000 af
T
otal Runoff Area = 4.147 ac Runoff Volume = 0.265 af Average Runoff Depth = 0.77"
79.01% Pervious = 3.277 ac 20.99% Impervious = 0.870 ac
Page 236
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 21Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment 1S: Runoff
R
unoff = 0.00 cfs @ 18.40 hrs, Volume= 0.000 af, Depth= 0.03"
Routed to Link 2L : offsite runoff
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 10-Year Rainfall=3.79"
Area (sf) CN Description
7
,842 39 >75% Grass cover, Good, HSG A
7
,842 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, min
S
ubcatchment 1S: Runoff
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.001
0.001
0.001
0.001
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0
0
0
MSE
24-hr 4
10-Year Rainfall=3.79"
Runoff Area=7,842 sf
Runoff Volume=0.000 af
Runoff Depth=0.03"
Tc=10.0 min
CN=39
0.00
cfs
Page 237
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 22Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D5: D5
R
unoff = 4.14 cfs @ 12.13 hrs, Volume= 0.258 af, Depth= 3.18"
Routed to Pond P5 :
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 10-Year Rainfall=3.79"
Area (sf) CN Description
* 1
4,424 98 pavement
* 22,344 98 building
* 1,140 98 basin
4,553 39 >75% Grass cover, Good, HSG A
4
2,461 Weighted Average
4,553 10.72% Pervious Area
37,908 89.28% Impervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
6
.0 Direct Entry,
S
ubcatchment D5: D5
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
4
3
2
1
0
M
SE 24-hr 4
10-Year Rainfall=3.79"
Runoff Area=42,461 sf
Runoff Volume=0.258 af
Runoff Depth=3.18"
Tc=6.0 min
CN=WQ
4.14
cfs
Page 238
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 23Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment E1: existing
R
unoff = 0.01 cfs @ 18.40 hrs, Volume= 0.007 af, Depth= 0.03"
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 10-Year Rainfall=3.79"
Area (ac) CN Description
2
.992 39 >75% Grass cover, Good, HSG A
2
.992 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry,
S
ubcatchment E1: existing
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.011
0.01
0.01
0.009
0.009
0.008
0.008
0.007
0.007
0.006
0.006
0.005
0.005
0.004
0.004
0.003
0.003
0.002
0.002
0.001
0.001
0.000
0
MSE
24-hr 4
10-Year Rainfall=3.79"
Runoff Area=2.992 ac
Runoff Volume=0.007 af
Runoff Depth=0.03"
Tc=10.0 min
CN=39
0.01
cfs
Page 239
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 24Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Pond P5:
In
flow Area = 0.975 ac, 89.28% Impervious, Inflow Depth = 3.18" for 10-Year event
Inflow = 4.14 cfs @ 12.13 hrs, Volume= 0.258 af
Outflow = 0.29 cfs @ 13.18 hrs, Volume= 0.258 af, Atten= 93%, Lag= 63.0 min
Discarded = 0.29 cfs @ 13.18 hrs, Volume= 0.258 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routed to Link 2L : offsite runoff
Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
Peak Elev= 1,644.45' @ 13.18 hrs Surf.Area= 3,447 sf Storage= 5,531 cf
Plug-Flow detention time= (not calculated: outflow precedes inflow)
Center-of-Mass det. time= 191.3 min ( 942.6 - 751.2 )
Volume Invert Avail.Storage Storage Description
#
1 1,642.00' 24,860 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Elevation Surf.Area Inc.Store Cum.Store
(feet) (sq-ft) (cubic-feet) (cubic-feet)
1
,642.00 1,140 0 0
1,643.00 2,020 1,580 1,580
1,644.00 3,000 2,510 4,090
1,645.00 4,000 3,500 7,590
1,646.00 5,270 4,635 12,225
1,647.00 20,000 12,635 24,860
Device Routing Invert Outlet Devices
#
1 Primary 1,644.75' 10.0' long + 4.0 '/' SideZ x 1.0' breadth Broad-Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00
Coef. (English) 2.69 2.72 2.75 2.85 2.98 3.08 3.20 3.28 3.31
3.30 3.31 3.32
#2 Discarded 1,642.00' 3.600 in/hr Exfiltration over Surface area
Discarded OutFlow Max=0.29 cfs @ 13.18 hrs HW=1,644.45' (Free Discharge)
2=Exfiltration (Exfiltration Controls 0.29 cfs)
P
rimary OutFlow Max=0.00 cfs @ 0.00 hrs HW=1,642.00' TW=0.00' (Dynamic Tailwater)
1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)
Page 240
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 25Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
P
ond P5:
I
nflow
Ou
tflow
D
iscarded
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
4
3
2
1
0
In
flow Area=0.975 ac
Peak Elev=1,644.45'
Storage=5,531 cf
4.14
cfs
0.29
cfs 0.29
cfs
0.00
cfs
Page 241
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 26Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Link 2L: offsite runoff
In
flow Area = 2.710 ac, 75.91% Impervious, Inflow Depth = 0.00" for 10-Year event
Inflow = 0.00 cfs @ 18.40 hrs, Volume= 0.000 af
Primary = 0.00 cfs @ 18.40 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
L
ink 2L: offsite runoff
I
nflow
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.001
0.001
0.001
0.001
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0
0
0
In
flow Area=2.710 ac
0.00
cfs 0.00
cfs
Page 242
M
SE 24-hr 4 10-Year Rainfall=3.79"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 27Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Link 4L: north
In
flow Area = 1.555 ac, 76.32% Impervious, Inflow Depth = 0.00" for 10-Year event
Inflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min
Routed to Link 2L : offsite runoff
Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
10-Year Inflow Imported from 26-0159 north~Link 1L.hce
L
ink 4L: north
I
nflow
Pri
mary
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
1
0
Inf
low Area=1.555 ac
10-Year Inflow
Imported from
26-0159 north~Link 1L.hce
Area= 1.555 ac
76.32% Imperv.
0.00
cfs 0.00
cfs
Page 243
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 28Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
T
ime span=0.00-40.00 hrs, dt=0.05 hrs, 801 points
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Run
off Area=7,842 sf 0.00% Impervious Runoff Depth=0.58"S
ubcatchment 1S: Runoff
T
c=10.0 min CN=39 Runoff=0.06 cfs 0.009 af
Runoff Area=42,461 sf 89.28% Impervious Runoff Depth=5.59"S
ubcatchment D5: D5
T
c=6.0 min CN=WQ Runoff=7.09 cfs 0.454 af
Runoff Area=2.992 ac 0.00% Impervious Runoff Depth=0.58"S
ubcatchment E1: existing
T
c=10.0 min CN=39 Runoff=1.04 cfs 0.143 af
Peak Elev=1,645.01' Storage=7,633 cf Inflow=7.09 cfs 0.454 afP
ond P5:
D
iscarded=0.33 cfs 0.355 af Primary=3.81 cfs 0.099 af Outflow=4.14 cfs 0.454 af
Inflow=7.30 cfs 0.211 afL
ink 2L: offsite runoff
Pr
imary=7.30 cfs 0.211 af
100-Year Inflow Imported from 26-0159 north~Link 1L.hce Inflow=3.94 cfs 0.103 afL
ink 4L: north
Are
a= 1.555 ac 76.32% Imperv. Primary=3.94 cfs 0.103 af
T
otal Runoff Area = 4.147 ac Runoff Volume = 0.606 af Average Runoff Depth = 1.75"
79.01% Pervious = 3.277 ac 20.99% Impervious = 0.870 ac
Page 244
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 29Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment 1S: Runoff
R
unoff = 0.06 cfs @ 12.26 hrs, Volume= 0.009 af, Depth= 0.58"
Routed to Link 2L : offsite runoff
Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-40.00 hrs, dt= 0.05 hrs
MSE 24-hr 4 100-Year Rainfall=6.43"
Area (sf) CN Description
7
,842 39 >75% Grass cover, Good, HSG A
7
,842 100.00% Pervious Area
Tc Length Slope Velocity Capacity Description
(min) (feet) (ft/ft) (ft/sec) (cfs)
1
0.0 Direct Entry, min
S
ubcatchment 1S: Runoff
R
unoff
H
ydrograph
Time
(hours)
40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0
Flow
(cfs)
0
.07
0.065
0.06
0.055
0.05
0.045
0.04
0.035
0.03
0.025
0.02
0.015
0.01
0.005
0
MSE
24-hr 4
100-Year Rainfall=6.43"
Runoff Area=7,842 sf
Runoff Volume=0.009 af
Runoff Depth=0.58"
Tc=10.0 min
CN=39
0.06
cfs
Page 245
M
SE 24-hr 4 100-Year Rainfall=6.43"2
6-0159 south
P
rinted 5/28/2026Prepared by
Vreeland Associates
P
age 30Hy
droCAD® 10.20-8a s/n 09881 © 2025 HydroCAD Software Solutions LLC
S
ummary for Subcatchment D5: D5
R
unoff = 7.09 cfs @ 12.13 hrs, Volume= 0.454
Text truncated. Open the original for the full document.
Source: City of Eagle River website. First collected Oct 10, 2026.