Sanitary District No. 2 Meeting Minutes – APPROVED
Date: Thursday, June 26, 2025
Time: 4:30 p.m.
Location: 2800 Ward Ave, La Crosse, WI 54601
Present: Sanitary District Commissioners Tim Ehler and Robert Lynn; Administrator Christina
Peterson, Water/Sewer Operator Dan Odeen; Public Works Terry Wright
Absent: None.
Attendance List: None.
1. Regular meeting called to order by Lynn at 4:30 p.m.
2. Minutes from May 22, 2025. Motion by Ehler to approve minutes from 5/22/2025, second
by Lynn. Motion carried unanimously.
3. Bills Payable. Motion by Ehler to approve payables closed $93,068.87 and to approve
open $12,685.88, second by Lynn. Motion carried unanimously.
4. Public Comment. none
5. Arbor Hills Lift Station – Pump Rehabilitation Quote. First quote from LW Allen to replace
the impeller and seals and keep motors. Lead time 8-12 weeks. Energenecs
demonstrated a couple pumps that could chew up anything and gave a quote for two
pumps. Arbor Hills is currently a dry system with need to enter pit to change parts and
prime system. Discussion on switching over to a wet well but noted the expense. Lynn
requested Odeen summarize the options and bring to next meeting.
6. Revision to Arbor Hills Lift Station Generator Proposal. Public Works asked Kish Electric to
look at going to an air cooled versus water cooled. Kish advised it would not work, as it
wouldn’t be powerful enough to start one pump. A water cooled new 24kw with transfer
switch would be $300 more than the original 30 kw that was proposed. It was questioned
whether the 24kw was without tariff. Lynn suggested having Roger from Kish attend the
next meeting to discuss.
7. Administrator Report. Peterson gave update that storm sewer at Ebner coulee Road is
redirected away from Sewer Spur MH.
8. Public Works Report. Generator for Arbor Hills Well #1 is ordered. Odeen reported that
Wedgewood Valley Well #1 rehab is scheduled for June 30 th. Odeen updated the
commissioners regarding an update on communications upgrade proposal. Existing
system is from 2002. To upgrade, including alarm system would be $167,900. The system
would still use radio signal and wells would stay on soft start. Electronics would be
modern and parts replaceable. Wright requested if Intern could call to schedule more
water/sewer house inspections. Odeen referenced an event in which Xcel gas hit our
sewer forcemain at 28th and Cass, which triggered a requirement to update our CMOM
report for the State.
9. President/Commissioner Reports. The news of Sanitary District No. 2 President Kurt
Knutson passing away on June 26th was shared. His years of service will be formally
recognized at a future meeting.
10. Next Meeting Date. July 24, 2025 at 4:30 p.m.
11. Adjournment. Motion by Ehler to adjourn at 5:45 p.m., second by Lynn, Motion carried
unanimously.
Respectfully Submitted, Christina Peterson, Administrator.