Garage Update 2.10.26 — Agenda packet
Town of Brule · Douglas County · Garage Update 2.10.26 · meeting of Feb 10, 2026 · Agenda packets
Open the original document More from Town of Brule
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
2 West 1st Street, Suite 201, Duluth, Minnesota 55802
tel (218) 727-2626 fax (218) 722-7467
dsgw.com Recognized as JUST organization by the International Living Future Institute
DSGW is an Equal Opportunity Employer
Specifications
BRULE PUBLIC WORKS
GARAGE
Brule, Wisconsin
Project #
025170.00
March 10th, 2026
25170 Brule Public Works
Garage
00 01 01 - 1 PROJECT MANUAL &
REGISTRATION SHEET
SECTION 00 01 01
PROJECT MANUAL TITLE AND REGISTRATION SHEET
BRULE PUBLIC WORKS GARAGE
BRULE, WISCONSIN
DSGW PROJECT NO.: 025170.00
DATE: MARCH 10 th, 2026
ARCHITECT
DSGW ARCHITECTS
2 West 1st Street, Suite 201
Duluth, MN 55802
Phone: 218-727-2626
STRUCTURAL/CIVIL ENGINEER
NORTHLAND CONSULTING ENGINEERS
102 South 21st Avenue West, Suite 1
Duluth, MN 55806
Phone: 218-727-5995
MECHANCIAL/ELECTRICAL ENGINEER
WINDSOR ENGINEERS
4802 Oneota St Suite 2
Duluth, MN 55807
Phone: 612-389-1658
I hereby certify that these plans, specifications, or report were prepared by me or under my direct
supervision and that I am a duly registered Architect under the laws of the state of Wisconsin.
John Erickson Reg. No. 9676-055
© DSGW. All rights reserved.
The architectural works depicted herein are the sole property of DSGW and may not be constructed or
used without its express written permission. No permission to modify or reproduce any of these
architectural works, including without limitation the construction of any building, is expressed or should be
implied from delivery of preliminary drawings or unsealed construction drawings. Permission to construct
the building depicted in sealed construction drawings is expressly conditioned on the full and timely
payment of all fees otherwise due DSGW and, in the absence of any written agreement to the contrary, is
limited to a one-time use on the site indicated on these plans.
END OF SECTION
DOCUMENT 000105 – CERTIFICATIONS PAGE
PART 1 – GENERAL
1.1 DESIGN PROFESSIONALS OF RECORD
Mechanical Engineer, HVAC & Plumbing: I hereby certify that the portion of
this technical submission described below was prepared by me or under my
direct supervision and responsible charge. I am a duly licensed Professional
Engineer under the laws of the State of Wisconsin.
DIVISION 22 & 23 TECHNICAL SPECIFICATIONS.
Calenn Heppner, PE
Windsor Engineers
License Number: 48270
_________________________________________ _________________
Signature Date
Electrical Engineer: I hereby certify that the portion of this technical
submission described below was prepared by me or under my direct
supervision and responsible charge. I am a duly licensed Professional
Engineer under the laws of the State of Wisconsin.
DIVISION 26 & 27 TECHNICAL SPECIFICATIONS.
Louis Meyette, PE
Windsor Engineers
License Number: 100172
_________________________________________ _________________
Signature Date
03/09/2026
03/09/2026
25170 Brule Public Works Garage 00 01 10 - 1 TABLE OF CONTENT
SECTION 00 01 10
TABLE OF CONTENTS
BRULE PUBLIC WORKS GARAGE
BRULE, WISCONSIN
DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 01 Project Manual and Registration Sheet
00 01 05 Certifications Page
00 01 10 Table of Contents
00 01 15 Schedule of Drawings
00 11 13 Advertisement for Bids
00 21 13 Instructions to Bidders
00 22 13 Supplementary Instructions to Bidders
00 31 00 Available Project Information
----------- Report of Geotechnical Exploration
00 40 00 Bid Form Instructions
00 41 00 Bid Form
00 43 25 Request for Approval of Substitutions
00 72 00 - General Conditions
00 73 00 - Supplementary Conditions
DIVISION 01 -- GENERAL REQUIREMENTS
01 10 00 - Summary
01 20 00 - Price and Payment Procedures
01 30 00 - Administrative Requirements
01 40 00 - Quality Requirements
01 50 00 - Temporary Facilities and Controls
01 60 00 - Product Requirements
01 70 00 - Execution and Closeout Requirements
01 78 00 - Closeout Submittals
DIVISION 03 -- CONCRETE
03 10 00 - Concrete Forming and Accessories
03 20 00 - Concrete Reinforcing
03 30 00 - Cast-in-Place Concrete
DIVISION 05 -- METALS
05 40 00 Cold Formed Metal Framing
05 50 00 Metal Fabrications
DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES
06 10 00 Rough Carpentry
06 20 00 Finish Carpentry
06 41 00 - Architectural Wood Casework
06 82 13 Fiberglass Reinforced Wall Panels
25170 Brule Public Works Garage 00 01 10 - 2 TABLE OF CONTENT
DIVISION 07 -- THERMAL AND MOISTURE PROTECTION
07 11 13 Bituminous Dampproofing
07 21 00 Thermal Insulation
07 21 17 Pre-Engineered Building Insulation
07 21 19 Foamed in Place Insulation
07 25 00 Weather Barriers
07 42 14 Insulated Metal Wall Panels
07 62 00 Sheet Metal Flashing and Trim
07 84 00 Firestopping
07 90 05 - Joint Sealers
DIVISION 08 -- OPENINGS
08 11 13 - Hollow Metal Doors & Frames
08 14 16 - Flush Wood Doors
08 31 00 Access Doors
08 36 13 Sectional Doors
08 43 13 - Aluminum-Framed Storefronts
08 71 00 - Door Hardware
08 80 00 Glazing
DIVISION 09 -- FINISHES
09 21 16 - Gypsum Board Assemblies
09 51 00 - Acoustical Ceilings
09 65 00 - Resilient Flooring
09 67 00 Fluid Applied Flooring
09 90 00 - Painting and Coating
DIVISION 10 -- SPECIALTIES
10 14 19 Cast Letters
10 14 23 - Interior Signage
10 28 00 Toilet, Bath, And Laundry Accessories
10 44 00 - Fire Protection Specialties
DIVISION 12 -- FURNISHINGS
12 24 13 Window Shade Systems
DIVISION 13 SPECIAL CONSTRUCTION
13 34 19 Metal Building Systems
DIVISION 22 -- PLUMBING
22 05 00 Common Work Results for Plumbing
22 05 16 Expansion Fittings and Loops for Plumbing Piping
22 05 17 Sleeves and Sleeve Seals for Plumbing Piping
22 05 19 Meters and Gauges for Plumbing Piping
22 05 23 General-Duty Valves for Plumbing Piping
22 05 29 Hangers and Supports for Plumbing Piping and Equipment
22 05 48 Vibration and Seismic Controls for Plumbing Piping and Equipment
22 05 53 Identification for Plumbing Piping and Equipment
25170 Brule Public Works Garage 00 01 10 - 3 TABLE OF CONTENT
22 07 16 Plumbing Equipment Insulation
22 07 19 Plumbing Piping Insulation
22 10 05 Plumbing Piping
22 10 06 Plumbing Piping Specialties
22 11 23 Dometic Water Pumps
22 13 19 Sanitary Waste Piping Specialties
22 15 00 General-Service Compressed-Air Systems
22 30 00 Plumbing Equipment
22 40 00 Plumbing Fixtures
22 45 00 Emergency Plumbing Fixtures
DIVISION 23 HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
23 05 17 Sleeves and Sleeve Seals for HVAC Piping
23 05 29 Hangers and Supports for HVAC Piping and Equipment
23 05 48 Vibration and Seismic Controls for HVAC
23 05 53 Identification for HVAC Piping and Equipment
23 05 93 Testing Adjusting, and Balancing for HVAC
23 07 13 Duct Insulation
23 07 19 HVAC Piping Insulation
23 08 00 Commissioning of HVAC
23 11 23 Facility Natural-Gas Piping
23 21 13 Hydronic Piping
23 21 14 Hydronic Specialties
23 21 23 Hydronic Pumps
23 23 00 Refrigerant Piping
23 31 00 HVAC Ducts and Casing
23 33 00 Air Duct Accessories
23 34 23 HVAC Power Ventilators
23 35 16 Engine Exhaust Systems
23 37 00 Air Outlets and Inlets
23 52 16 Condensing Boilers
23 55 33 Fuel-Fire Unit Heaters
23 72 23 Packaged Air-to-Air Energy Recovery Units
23 81 26.13 Small-Capacity Split-System Air Conditioners
23 84 10 Electric Heating Equipment
DIVISION 26 -- ELECTRICAL
26 05 19 Low-Voltage Electrical Power Conductors and Cables
26 05 26 Grounding and Bonding for Electrical Systems
26 05 29 Hangers and Supports for Electrical Systems
26 05 33.13 Conduit for Electrical Systems
26 05 33.16 Boxes for Electrical Systems
26 05 53 Identification for Electrical Systems
26 05 73 Power System Studies
25170 Brule Public Works Garage 00 01 10 - 4 TABLE OF CONTENT
26 09 23 Lighting Control Devices
26 24 16 Panelboards
26 27 13 Electricity Metering
26 28 16.16 Enclosed Switches
26 32 13 Engine Generators
26 36 00 Transfer Switches
26 43 00 Surge Protective Devices
26 51 00 Interior Lighting
26 56 00 Exterior Lighting
DIVISION 27 -- COMMUNICATIONS
27 05 33.13 Conduit for Communications Systems
27 10 00 Structured Cabling
END OF SECTION
25170 Brule Public Works Garage 00 01 15 - 1 SCHEDULE OF DRAWINGS
SECTION 00 01 15
SCHEDULE OF DRAWINGS
BRULE PUBLIC WORKS GARAGE
BRULE, WISCONSIN
SHEET TITLE
G1.1 Life Safety Plan & Energy Code Summary
G1.2 Mounting Heights
CIVIL
G001 Sheet Index and Notes
G002 Civil Legends and Abbreviations
G003 Topographic Survey
C050 Existing Conditions and Demolition
C100 Composite Site and Utility Plan
C110 Erosion Control and Grading
C111 Grading Enlargement
C300 Stormwater Facility
C600 Erosion Control Details
C610 Site Details
C620 Sewer Details
STRUCTURAL
S0.1 General Notes/Sheet Index
S1.0 Typical Details Concrete
S1.1 Typical Details Light Gauge Steel
S2.0 Foundation Plan/Mezzanine Framing Plan
S3.0 Sections and Details
ARCHITECTURAL
A2.0 Floor Plan
A2.1 Enlarged Plans & Interior Elevations
A2.2 Roof Plan / RCP Plan
A4.1 Schedules and Types
A5.1 Exterior Elevations
A5.2 Exterior Elevations 3D
A6.1 Building Sections & Wall Sections
A6.2 Wall Sections
MECHANICAL - PLUMBING
M0.1 Cover Sheet Mechanical
M0.2 Schedules Mechanical
M2.1 Floor Plan Mechanical
M2.2 ME Mechanical
M5.1 Cover Sheet Mechanical
P0.1 Cover Sheet
P0.2 Schedules
P0.3 Schedules
P2.1 Underfloor Plan
P2.2 Floor Plan
P3.1 Enlarged Floor Plan
P5.1 Details
P5.2 Details
P6.1 Diagrams
25170 Brule Public Works Garage 00 01 15 - 2 SCHEDULE OF DRAWINGS
ELECTRICAL
E0.1 Cover Sheet Electrical
E0.2 Schedules Electrical
E1.0 Site Plan Electrical
E2.1 Floor Plan Electrical
E3.1 Lighting RCP Electrical
E5.1 Details Electrical
E6.1 One-Line Diagram Electrical
END OF SECTION
25170 Brule Public Works
Garage
00 11 13 - 1 ADVERTISEMENT FOR BIDS
SECTION 00 11 13
ADVERTISEMENT FOR BIDS
BRULE PUBLIC WORKS GARAGE
BRULE, WISCONSIN
The City of Brule, Wisconsin will receive sealed bids for the BRULE PUBLIC WORKS GARAGE, until
Tuesday, March 31st, 2026, by 2:00 p.m., at the Town of Brule, ATTN: Diane Nelson, Town Clerk, 5231
South County Line Road, Brule, WI 54820, at which time all Bids will be publicly opened, read aloud and
tabled. City of Brule to act on this item at a future meeting.
All bids must be sealed and clearly marked, "BID FOR: BRULE PUBLIC WORKS GARAGE", along with
bidder's name, and must be accompanied by a certified check or bidder's bond in the amount of five
percent (5%) of the net base bid amount, payable to the order of City of Brule, Wisconsin as warranty that
the successful bidder will enter into a contract and furnish the usual Bonds (Performance Bond and Labor
and Material Payment Bond) as required within ten (10) days after Notice of Award of Contract.
Bid Documents (plans and specifications) will be available electronically beginning Tuesday, March 10 th,
2026. Free access to the plans & specifications may be obtained by contacting DSGW Architecture, (218)
727-2626. Bid Documents may also be examined at the builders exchanges of: Minnesota Builders
Exchange, Construct Connect, and Dodge Data & Analytics. Pre-printed plans and specifications will not
be provided.
No Bidder shall modify, withdraw or cancel their Bid or any part thereof for sixty (60) days after the date
designated for the receipt of bids. The Owner reserves the right to reject any and all bids and to waive any
irregularities and informalities therein and to award the Contract to other than the lowest bidder, if in their
discretion the interest of the project will be best served thereby.
*Project is tax-exempt. City of Brule will provide tax exemption forms to awarded contractor.
A Pre-Bid Meeting is scheduled for Tuesday, March 17th, 2026 at 2:00 p.m. at the Brule Town Hall,
5820 Maple Street, Brule, WI 54820.
Milestone Dates:
1. Bids due Tuesday, March 31st, 2026, by 2:00 p.m.
2. Plans will be issued for bid on Tuesday, March 10th, 2026.
3. Pre-Bid Meeting will be Tuesday, March 17th, 2026, at 2:00 p.m.
END OF SECTION
25170 Brule Public Works
Garage
00 21 13 - 1 INSTRUCTIONS TO BIDDERS
SECTION 00 21 13
INSTRUCTIONS TO BIDDERS
PART I GENERAL
1.01 INSTRUCTIONS TO BIDDERS
A. The "Instructions to Bidders", AIA Document No. A701, copyright 2018, as published by the
American Institute of Architects, Article 1 thru 8, inclusive, are hereby made a part of the Contract
Documents to the same extent as if bound herein and as supplemented hereinafter. A copy of
A701 is on file in the Architect's office.
B. The "Supplementary Instructions to Bidders", Section 00 22 13, shall modify, replace or define
portions of AIA A701, Instructions to Bidders, 2018 Edition.
END OF SECTION
25170 Brule Public Works 00 21 13 - 1 SUPPLEMENTARY INSTRUCTIONS
TO BIDDERS
SECTION 00 22 13
SUPPLEMENTARY INSTRUCTIONS TO BIDDERS
THE FOLLOWING SUPPLEMENTARY INSTRUCTIONS TO BIDDERS SHALL MODIFY, REPLACE, OR
DEFINE PORTIONS OF THE A.I.A. INSTRUCTIONS TO BIDDERS, A701, 2018 EDITION. THOSE
PORTIONS OF THE A.I.A. INSTRUCTIONS TO BIDDERS, A701, WHICH ARE NOT ALTERED BY
THESE SUPPLEMENTARY GENERAL CONDITIONS SHALL REMAIN IN EFFECT AS PUBLISHED.
1. ARTICLE 1 - DEFINITIONS
ADD the following Paragraph:
1.10 The word "product" herein means any material, equipment, assembly, manufacturer,
brand, trade name, element, item or similar description as applicable. Wherever a product
is named on the Drawings or in the Specifications, the phrase "or acceptable substitute in
the opinion of the Architect" shall be implied throughout the Specification, whether
specifically noted or not.
2. ARTICLE 3 - BIDDING DOCUMENTS
ADD to and modify paragraph 3.1.1 as follows:
3.1.1 Bidders may access the documents electronically as noted in the Advertisement for Bids,
Section 00 11 13.
ADD paragraph 3.2.4 as follows:
3.2.4 It is the Bidder's (and Contractor's) responsibility to bring all discrepancies, ambiguities,
omissions, for matters in need of clarification to the attention of the Architects or
interpretation and decision.
ADD the following Subparagraphs after paragraph 3.3.1:
3.3.1.1 Any product or manufacturer used as basis of the Specifications shall generally set the
criteria. It shall be expressly understood that any other product or manufacturer listed in
the Specification or any addenda as acceptable will be acceptable provided they fully
comply with the requirements and match the basic and essential criteria of the product
used for base Specification, including the level of workmanship quality, as determined by
the Architect. For final acceptance for use in the work, the Architect shall have the right to
accept or reject proposed deviations. Should a proposed product be unable to meet
requirements, the product shall not be used.
3.3.1.2 Where two or more products are shown or specified, the Bidder and Contractor has his
option of which to use, provided the product proposed will meet all requirements of the
Specifications and the design criteria. The right is reserved by the Architect to accept or
reject proposed deviations in design, function, construction or similar differences that will
affect design intent or quality, or,
3.3.1.3 For any same or like product for this Project, only one brand, manufacturer, source or type
shall be used, as approved by Architect.
3.3.1.4 For products specified or shown by describing proprietary items, model numbers, catalog
numbers, manufacturers, trade names or similar reference, each Bidder obligates himself
to submit bids and accept awards of a contract based upon the use of such products. The
reference is intended to establish the measure for the quality, which has been determined
as requisite and necessary for the Project.
25170 Brule Public Works 00 21 13 - 2 SUPPLEMENTARY INSTRUCTIONS
TO BIDDERS
REVISE paragraph 3.3.2 as follows:
3.3.2 No substitutions will be considered prior to receipt of bids unless written request for
approval has been received by the Architect at least seven (7) days prior to the Date for
receipt of Bids.
ADD the following at the end of paragraph 3.3.3:
...If a written reply is required, the Contractor shall furnish two (2) copies of the
request and a self-addressed, stamped envelope. FAX REQUESTS WILL NOT BE
ACCEPTED.
ADD paragraph 3.3.6 as follows:
3.3.6 The supplier or manufacturer providing any acceptable product shall bear the cost of any
required modifications to spaces, services, utilities and other features as the result of the
use of his product, including but not limited to, larger capacity mechanical or electrical
service, devices or utilities resulting from acceptance of the product for bidding purposes,
as well as to pipes, conduits, ducts, and controls for conveying, distributing, and controlling
those services or utilities; as well as insulation, wrapping, coatings, or other integral
features of the lines or items conveying those lines, and additional costs of the products
installation.
3. ARTICLE 4 - BIDDING PROCEDURES
4.1 FORM AND STYLE OF BIDS
DELETE paragraphs 4.1.1 and ADD the following:
4.1.1 Bids shall be submitted on forms identical to the form included in the Bidding Documents,
photo copies will be acceptable. The Bidder shall submit two (2) copies of the bid Form
with his Bid. DO NOT REMOVE BID FORMS FROM BIDDING DOCUMENTS.
4. ARTICLE 6 - POST BID INFORMATION
ADD the following paragraph:
6.4 TIME AND COMPLETION
6.4.1 Each Bidder agrees to commence work on or before a date to be specified in a written
"Notice to Proceed" signed by the Owner, and to substantially complete the work by the
date stated on the Bid Form.
5. ARTICLE 7 - PERFORMANCE BOND AND LABOR AND MATERIAL PAYMENT BOND
7.1 BOND REQUIREMENTS
ADD the following paragraph:
7.1.4.1 Performance/Payment Bonds are required.
25170 Brule Public Works 00 21 13 - 3 SUPPLEMENTARY INSTRUCTIONS
TO BIDDERS
6. ADDITIONAL LAWS AND REGULATIONS
A. The Bidder's attention is directed to the fact that all applicable State laws, County and
municipal ordinances and the Rules and Regulations of all authorities having jurisdiction
over the construction of the project shall apply to the contract throughout and they will be
deemed to be included in the Contract the same as though written.
B. The bidders shall account for most recent edition of Prevailing Wage Rates set forth by the
State of Wisconsin Douglas County.
1. https://dwd.wisconsin.gov/er/laborstandards/prevailingwage/
C. The bidders shall account for most recent edition of Prevailing Wage Rates set forth by the
U.S. Department of Labor.
D. Project is Tax-Exempt.
END OF SECTION
25170 Brule Public Works Garage 00 31 00 - 1 AVAILABLE PROJECT
INFORMATION
SECTION 00 31 00
AVAILABLE PROJECT INFORMATION
PART 1 GENERAL
1.01 GEOTECHNICAL REPORT
A. Geotech Evaluation Report for proposed Town of Brule Public Works Garage in Brule, WI by
Twin Ports Testing, dated December 5, 2025. Appended to this section.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
END OF SECTION
Geotechnical Evaluation Report
Proposed Town of Brule Public Works Garage
Brule, Wisconsin
Prepared for:
DSGW Architecture
I hereby certify that this plan, specification, or report was prepared by me or under my
direct supervision and that I am a duly Licensed Professional Engineer under th e laws of
the State of Wisconsin.
Michael A. Haapala, PE
License Number: E-40299
December 5, 2025
TPT Project Number: 25G2116
1301 N 3
rd
St. ⚫ Superior WI 54880 ⚫ 715 - 392 - 7114 ⚫ 1 - 800 - 373 - 2562 ⚫ F 715 - 392 - 7163 ⚫ www.twinportstesting.com
December 5, 2025 TPT Project No. 25G2116
Nick Hulstrom, AIA, NCARB
Architect
DSGW Architecture
14 East Bayfield Street
Washburn, WI
Re: Proposal for Geotechnical Services
Town of Brule Public Works Garage
Town of Brule
Douglas County, WI
Dear Mr. Hulstrom:
Enclosed is our geotechnical evaluation report for the above referenced project. We have
prepared this report and based our conclusions upon current applicable professional standards.
If you have any questions concerning the data, the recommendations presented, or if we may
be of further service on this project, please contact us at 715.392.7114. We appreciate the
opportunity to be of service to you.
Sincerely,
Twin Ports Testing
Brett Carlson, PE (MN)
Geotechnical Engineer
Michael A. Haapala, PE
Principal Engineer
Attachment:
Geotechnical Evaluation Report
1 Introduction
1.1 Scope of Services ..................................................................................................................... 1
1.2 Proposed Project ..................................................................................................................... 1
2 Site Conditions ..................................................................................................................... 2
2.1 Site Locations and Existing Conditions .................................................................................... 2
2.2 Topography .............................................................................................................................. 3
2.3 Geologic Setting ....................................................................................................................... 3
3 Field Procedures .................................................................................................................. 4
3.1 Boring Locations and Elevations .............................................................................................. 4
3.2 Sampling .................................................................................................................................. 4
3.3 Boring Logs .............................................................................................................................. 5
3.4 Water Level Readings .............................................................................................................. 5
4 Subsurface Conditions ......................................................................................................... 5
4.1 Soil ........................................................................................................................................... 5
4.2 Groundwater ........................................................................................................................... 6
5 Laboratory Testing ............................................................................................................... 6
4.1 Water Content ......................................................................................................................... 6
4.2 Sieve Analysis .......................................................................................................................... 7
6 Analysis and Design Recommendations ................................................................................ 7
6.1 Design Considerations ............................................................................................................. 7
6.2 Site Preparation ....................................................................................................................... 7
6.3 Shallow Foundations ............................................................................................................... 7
6.4 Slabs ......................................................................................................................................... 9
6.5 Retaining Structures and Lateral Earth Pressures ................................................................. 10
6.6 Slopes and Drainage .............................................................................................................. 11
6.7 Backfill and Fill ....................................................................................................................... 11
6.7 Parking an Drive Areas .......................................................................................................... 12
7 Recommendations for Construction .................................................................................... 13
7.1 Excavations and Grading ....................................................................................................... 13
7.2 Observation ........................................................................................................................... 14
7.3 Frequency of Testing ............................................................................................................. 14
8 Limitations of Evaluation and Report .................................................................................. 15
8.1 Site Variations ........................................................................................................................ 15
8.2 Design Review ....................................................................................................................... 15
8.3 Continuity of Professional Responsibility .............................................................................. 15
8.4 Safe Working Conditions ....................................................................................................... 15
8.5 Exclusive Use ......................................................................................................................... 15
Appendix: Boring Location Map, Boring Logs B-1 throu gh B-8, Boring Log Notes and Soil
Classification Data
25G2116 1
1 Introduction
This report presents the results of our geotechnical evaluation for the proposed Town of Brule
Public Works Garage and Administration Office on Old Highway 2 in Brule, Wisconsin.
1.1 Scope of Services
Our scope of services for this geotechnical evaluation as outlined in our proposal 2 5G2116
dated October 24, 2025 included:
• Performing an exploration program consisting of eight (8) Standard Penetration Test
(SPT) borings: four (4) to depths of 25 feet or refusal within the building footprint, three
(3) to depths of 15 feet or refusal within the stormwater pond footprint, and one (1) to a
depth of 10 feet or refusal within the parking area footprint.
• Performing laboratory tests and observations of soil samples to evaluate pertinent
engineering properties of materials encountered.
• Preparing a report containing a description of the drilling program, a description of the
geology and subsurface conditions encountered, groundwater conditions, boring logs
with a boring location sketch, results of laboratory testing, and recommendations for
site preparation, foundation design, pavement design, and construction.
Twin Ports Testing II, Inc. (TPT) prepared this report for design purposes only. It may not have
sufficient subsurface information to prepare an accurate construction bid. We recommend that
contractors preparing bids or proposals for this project be provided with a complete copy of
this report as a supplement to the plans and specifications.
1.2 Proposed Project
We understand tha t DSGW Architects is in the design process to construct a public works
garage and administration office in Brule, Wisconsin. Addition al site work includes concrete
sidewalks, paved parking and drive areas, and a stormwater pond. The building construction
type and building loads are not known at the time of this report ; though we assume column
loads less than 50 kips and wall loads less than five kips per lineal foot.
Changes in the nature, design, and location of all or parts of this project may occur. The
conclusions and recommendations contained in this report shall not be considered applicable
to changes unless they are reviewed by the geotechnical engineer of record. We will then make
necessary changes or modifications to this report in writing only.
25G2116 2
1.2.1 Reference Information
We referenced the following documents as part of this project:
• Wisconsin Geological and N atural History Survey titled, “ Quaternary Geology of
Wisconsin,” dated 2025, prepared by J. Elmo Rawling III, Eric C. Carson, John W. Attig,
David M. Mickelson, William N. Mode, Mark D. Johnson, and Kent M. Syverson.
• Web Soil Survey website, prepared by the United States Department of Agriculture and
the Natural Resources Conservation Service. http://websoilsurvey.nrcs.usda.gov.
• Google Earth™
2 Site Conditions
2.1 Site Location and Existing Conditions
The proposed site is located around 500 feet northeast of the intersection of Old Highway 2 and
Hill Drive in Brule, Wisconsin as shown in Figure 1 below. The current building footprint and
parking area were cleared and graded. The surrounding areas and stormwater pond area
currently consist of wooded areas.
Figure 1: Site Location (Google Earth™)
Site Location
25G2116 3
2.1.1 Review of Historical Images
As part of our evaluation we looked at historical images of the site using Google Earth. Based
upon available imagery, this site has changed little since the first available image dated 1992.
2.2 Topography
This site has been previously graded and is relatively flat. Elevations between the boring
locations varied by less than 3 ½ feet.
2.3 Geologic Setting
Through an understanding of the geologic history and processes of an area, we are better able
to define and understand the range of geotechnical properties observed in the geological
materials encountered at the site. Knowledge of the anticipated subsurface profile at the site is
important for interpreting and correlating the borings from the field exploration program.
Based upon information from geologic survey reports, the geology local to the site generally
consists of glacial sediment of the Copper Falls Formation an d lake sediment. Glacial sediment
is defined as reddish-brown to brown sandy till and similar sediment deposited by the Langlade,
Wisconsin Valley, Chippewa, Superior, and Ontonagon lobes late in the Wisconsin Glaciation.
Areas of hummocky topography with typically 10 m of relief. Contains areas of sandy and
gravelly outwash and sandy and silty lake sediment. Ice -walled lake plains are common. Lake
sediment is defined as s tratified and well -sorted sandy gravel, sand, silt, and clay deposited
along shorelines of the Great Lakes and ice -marginal lakes; includes dunes, wave -cut benches,
sand bars, spits, and offshore plains. (Rawling III, Carson, Attig, Mickelson, Mode, Johnson, and
Syverson)
2.3.1 Results of Web Soil Survey
As part of our evaluation for this project we reviewed the Web Soil Survey website. The Web
Soil Survey consists of publically available soils information prepared by the United States
Department of Agriculture and the Natural Resources Conservation Service (NRCS). Our review
of this information identified one primary soil unit throughout the project area consisting of
“Rubicon sand”. In general, the Web Soil Survey suggests these soils consist of outwash sands.
In general, soil units in the Web Soil Survey correspond well with the results of our field
investigation.
2.3.2 Geologic Hazards
The potential for most geologic hazards is generally low for this site. A hazard potential
summary is shown in Table 1.
25G2116 4
Table 1: Geologic Hazard Summary
Geologic Hazard Present? Comments
Earthquake/Seismic Activity
No The proposed site is in an area of low seismic
activity.
Flooding
Unlikely This site is not located in areas with historic flood activity.
However, the proposed site is relatively flat and may
collect some stormwater.
Slope Failure/Landslides
No The proposed site is relatively flat with little to no
potential for slope failures.
Made Ground
No The proposed site has only been graded for drilling
access at the time of this report.
Swelling/Shrinking Soil
Unlikely Glacial and lake sediment soils at the site have low to
moderate potential for swelling and shrinking when
exposed to changes in water content or freezing
temperatures.
3 Field Procedures
Field procedures for this project included performing Standard Penetration Test (SPT) borings at
eight (8) locations; four (4) SPT borings within the proposed building footprint to depths of 20
feet, three (3) SPT borings within the proposed stormwater ponds to depths of 15 feet, and one
(1) SPT boring within the proposed parking areas to a depth of 10 feet.
SPT borings were performed with a Geoprobe Systems 7822DT track mounted drill rig using
hollow stem auger drilling methods. Drilling procedur es were performed on November 13,
2025 and November 14, 2025.
3.1 Boring Locations and Elevations
Boring locations were staked in the field by Pine Ridge Surveying prior to our field crews’ arrival
on site . The a pproximate boring locations are shown on the Boring Location Map in the
Appendix. Boring elevations were recorded in the field by TPT personnel using a surveying level
and rod. The base of the west side entrance gate was used as a benchmark and was assigned an
elevation of 100 feet. Boring elevations can be found on the boring logs included in the
Appendix.
3.2 Sampling
3.2.1 Standard Penetration Test (SPT) Borings
At selected depth intervals in the borings, Standard Penetration Tests (SPT) were conducted in
substantial compliance with ASTM Method D1586. The SPT “N” values shown on the boring logs
25G2116 5
are the number of blows required to drive a standard split barrel sampler 12 inches (two six -
inch increments) into undisturbed soil using a 140 pound drive hammer dropped 30 inc hes per
blow after an initial “set” of six inches. The “N” value is an index of the relative density of
cohesion-less soils and consistency of cohesive soils . The values shown on the boring logs are
field values and have not been corrected for hammer energy, surcharge, etc. Partially disturbed
samples obtained from the SPT borings were sealed in glass jars and returned to the laboratory
for testing.
3.3 Boring Logs
A field boring log was prepared for each boring by our field supervisor. These logs contain
factual information and field interpretation of the soil conditions observed, as described in
substantial compliance with ASTM D420 and D2488.
Final boring logs are included in the Appendix. The final logs represent our interpretation of the
contents of the field logs after laboratory observations b y a geotechnical engineer and
laboratory tests of the field samples were complete. Soils are described in this report according
to the Unified Soil Classification System (USCS), as outlined in the Boring Log Notes and Soil
Classification Data in the Appendix.
3.4 Water Level Readings
Water level readings were observed in the borings at the times and under the conditions stated
on the boring logs. We have reviewed the data and have reported interpretations in the text of
this report. However, it must be noted that fluctuations in the level of ground water may occur
because of variations in rainfall, temperature, subsurface materials and other conditions or
factors different from those observed at the time of our measurements. It should be noted that
such conditions are subject to change.
4 Subsurface Conditions
4.1 Soil
The subsurface soils encountered at this site generally consisted of four stratigraphic units: (1 )
Topsoil, (2) Silty Sand, (3) Poorly Graded Sand with Silt , (4) Silt with Sand . These units are
described below.
4.1.1 Topsoil
Topsoil was encountered in all boring locations from the surface to depths up to six inches.
Topsoil generally consisted of silty sand, contained trace roots and fibers , was fine to medium
grained, dark brown, and moist.
25G2116 6
4.1.2 Silty Sand
Silty sand soils were encountered below the topsoil in all boring locations at varying depths and
thicknesses. Silty sand soils generally contained trace gravel, were fine to medium grained,
brown to light brown, and moist. Trace organics, roots, and fibers were encountered to depths
up to 6 feet.
SPT N -values suggest that silty sand soils generally ranged from loose to medium dense in
relative density.
4.1.3 Poorly Graded Sand with Silt
Poorly graded sand with silt soils were encountered below the topsoil in all boring locations
excluding B -6 and B -7, at varying depths and thicknesses . Poorly graded sand with silt soils
generally contained trace gravel, were fine to medium grained, brown to light brown , and
moist. Trace organics, roots, and fibers were encountered to depths up to 6 feet.
SPT N -values suggest that poorly graded sand soils generally ranged from loose to medium
dense in relative density.
4.1.4 Silt with Sand
Silt with sand soils were encountered below the silty sand soils in Borings B-3 and B-4 at varying
depths and thicknesses. Silt with sand soils were brown and moist.
SPT N-values suggest that silt with sand soils generally ranged from loose to medium dense in
relative density.
4.2 Groundwater
Groundwater was not encountered within our borings during field procedures at this site.
Perched water may be encountered during excavation activities . A detailed evaluation of
groundwater levels at the site would require long term monitoring of piezometers and was not
included in the scope of this evaluation.
5 Laboratory Testing
Results of the field testing and observed subsurface conditions were evaluated to develop a
laboratory testing program. Laboratory testing of collected samples included visual
classification by a geotechnical engineer , water content testing , and sieve analysis. Results of
laboratory tests are shown on the boring logs in the Appendix.
25G2116 7
5.1 Water Content
Laboratory water content testing was performed in accordance with ASTM D2216 on select
collected samples from the field exploration. Values of water content are shown on the Boring
Logs in the Appendix.
5.2 Sieve Analysis
Sieve analysis testing of material passing the #200 sieve was performed in general accordance
with ASTM D114 0 procedures on two individual split spoon samples . Test results are shown in
Boring Logs in the Appendix.
Table 2: Summary of Sieve Analysis Results
Boring Depth (feet) Description of Material % Passing #200
B-3 2.0-3.5 SP-SM 7.9
B-5 2.0-3.5 SP-SM 7.3
SP-SM = Poorly Graded Sand with silt
6 Analyses and Design Recommendations
6.1 Design Considerations
6.1.1 Topsoil and Soils Containing Organics
Topsoil and soils containing organics, roots and fibers were encountered at all boring locations
at this site to depths up to six feet. It is possible that these soils will cause settlement beyond
the allowable limits of the structures when loaded.
6.2 Site Preparation
Topsoils and soils containing organics, roots, and fibers were encountered at all boring locations
at this site from the surface to depths up to six feet. We recommend removing all topsoil, fill
soils, and soils containing organics (>5%) encountered within the footprint and influence area
(1H:1V out from the outside edge of slabs/footings of the proposed structure) and replacing
with compacted engineered fill to reach design elevations. We also recommend removing all fill
and organic soils within existing utility trenches, if encountered, during excavation. Excavations
of six feet or greater should be anticipated.
6.3 Shallow Foundations
It is our understanding that frost depth footings are the preferred foundation option for this
project. Both frost depth footings and frost protected shallow foundations are feasible options
at this site. Recommendations for both systems are provided below.
25G2116 8
6.3.1 Frost Depth Footings
Frost depth footings bearing on native sand soils or compacted engineered fill over native sand
soils are a feasible option for this site. We recommend that footings and column pads for
unheated structures, as well as isolated exterior footings, bear a minimum of six feet below
grade. Footings for heated structures should bear a minimum of five feet below grade to
provide frost protection. Interior footings may bear directly below slabs.
6.3.2 Frost Protected Shallow Foundations
Frost protected shallow foundations are also a feasible option for this site. We recommend
using design methods outlined in ASCE 32 -01 “Design and Construction of Frost -Protected
Shallow Foundations.” Recommended R -Values for insulation assuming a design Air Freezing
Index of 3,000º F days are provided for unheated structures as shown in Table 3 below.
Table 3: Minimum Insulation R-Values
Structure Type Vertical Insulation R-Value Horizontal R-Value,
Along Walls
Horizontal R-Value,
At Corners
Heated Structure 7.8 6.5 8.6
Unheated Structure -* 18.2 18.2
* = No vertical insulation required for unheated structures. Assumes a continuous layer of insulation beneath the
footing and extending outward.
For heated structures, insulation should extend out at least 24 inches horizontally within 40
inches of outside corners and at least 12 inches horizontally away from outside corners. Vertical
insulation should be extended from the sill plate to the bottom of the footing to avoid cold
bridging. Insulation above grade should be provided with UV protection.
For unheated structures, insulation should extend horizontally a minimum of 79 inches outside
of foundations both along walls and at corners.
If non -frost susceptible fill soil extends to a depth of six feet or more beneath shallow
foundations, insulation is not required to provide frost protection. Insulation may be required
to meet energy code requirements. We recomme nd a minimum footing depth of 18 inches for
frost protected shallow foundations.
6.3.3 Net Allowable Bearing Stress
Results of the field and laboratory testing program were used to evaluate the net allowable
bearing stress for shallow foundations. In our opinion, a net allowable bearing stress (with a
minimum factor of safety of at least 3.0) of 3,000 psf (pounds per square foot) may be used to
design footings placed on native soils or engineered fill over native soils.
6.3.4 Settlement Estimate
For foundations designed according to the net allowable bearing stress es outlined above , we
estimate total settlement of less than one inch and differential settlements of less than ½ inch.
25G2116 9
6.3.5 Inclined and Eccentric Loads
Loading a footing eccentrically will reduce the bearing capacity of the footing. Footings should
be designed so that the resultant load is applied to the middle third (kern) of the footing. This
will allow the contact stress to remain greater than zero over the area of the footing.
6.3.6 Lateral Resistance
A coefficient of friction of 0.4 between compacted engineered fill and concrete footings may be
used for this project. Additional lateral resistance will also be provided by the passive earth
pressure between the side of the footing and adjacent soil. Lateral earth pressure parameters
for soil types encountered at this site are shown in Table 4.
6.3.7 Uplift
For a conservative approach, uplift of a footing can be resisted by the weight of the footing plus
the effective weight of the soil above the footing. If necessary, additional uplift resistance can
also be provided by the effective weight of the wedge of soil defined by a line extending up and
out from the edge of the footing at an angle of 30 degrees from vertical. Estimated unit weights
of soils types encountered at this site are shown in Table 4.
6.4 Slabs
6.4.1 Heated Structures
Interior slabs for heated structures can be supported on a layer of granular fill material placed
over engineered backfill. We recommend that a minimum of six inches of well-graded granular
material (classifying as SP in the Unified Soil Classification System) be used beneath slabs.
6.4.2 Unheated/Exterior Slabs
Unheated slabs may be constructed as part of this project. Soils encountered near the surface
at the site are considered frost susceptible. If provided a water source and freezing
temperatures, several inches or more of frost heave can occur. We recommend that slabs be
provided with frost protection as outlined in Section 6.3.2.
Heave can also be prevented by removing frost susceptible soils down to a depth of six feet
below slabs and replacing with non -frost susceptible soils having less than 5% passing the No.
200 sieve or by supporting slabs on frost depth foundations and leaving a void space for frost
heave.
6.4.3 Modulus of Subgrade Reaction
Slabs are anticipated to bear on native sand soils or compacted engineered fill over native sand
soils. The anticipated slab subgrade is a minimum of six inches of granular fill over native sand
soils. It is our opinion that a modulus of subgrade reaction, k, of 150 pounds per square inch per
inch of deflection (pci) may be used to design slabs.
25G2116 10
6.5 Retaining Structures and Lateral Earth Pressures
Retaining walls or below -grade structures should be designed to resist lateral earth pressures.
Recommendations are provided below.
6.5.1 Lateral Earth Pressure Parameters
Lateral earth pressures are an important part of designing underground structures including
retaining walls. Free standing walls where some displacement at the top of the wall is
acceptable can be designed to resist active lateral earth pressures. If no displacement at the top
of the wall is acceptable, such as basement walls, walls should be designed to resist at -rest
lateral earth pressures. Anchored walls should be designed to resist passive lateral earth
pressures. Estimated lateral earth pressure coefficients are shown in Table 4 below. Design of
retaining structures should account for any surcharge loads at the surface.
The estimated soil friction angles and coefficients of lateral earth pressure provided in Table 4
are for sustained loads (loads defined as permanent or semi -permanent such as dead weight).
Sustained loads allow time for excess soil pore water pressures to dissipate, resulting in drained
soil conditions. An effective stress analysis is used for sustained loads.
The soil parameters shown in Table 4 are estimates based on data from the borings and past
experiences near the site. A more extensive laboratory testi ng program would be required to
more accurately determine soil strength parameters.
Table 4: Estimated Soil Strength Parameters for Effective Stress Analysis
Soil Type Dry Unit
Weight
(pcf)
Friction Angle
(φ’, degrees)
Cohesion
(C’, psf)
Coefficients of Lateral Earth Pressure
K0 KA KP
ENGINEERED
FILL*
120 33 0 0.46 0.29 3.4
SP-SM
(Native)
125 34 0 0.44 0.28 3.5
SM (Native) 120 33 0 0.46 0.29 3.4
ML (Native) 110 28 0 0.53 0.36 2.8
SP-SM = Poorly Graded Sand
SM = Silty Sand
ML = Silt with Sand
*Soil parameters for engineered fill are conservative estimates. Additional laboratory testing would be
required to more accurately estimate soil parameters once an engineered fill source has been selected.
6.5.2 Drainage
If water percolates down alongside the wall it may become perched within the wall backfill.
Collecting run-off and discharging it well away from the foundation(s) and sloping the surface
down and away from the retaining wall are two common methods of reducing infiltration and
percolation. To collect surface water infiltration within the wall backfill we recommend
installing a perimeter foundation drain system. The drain system should consist of perforated
25G2116 11
pipe embedded in gravel and placed at an invert within two inches of the bottom -of-footing
elevation. A geotextile filter fabric should encase the pipe and gravel. The drain system should
be routed to a storm sewer, sump pump, low area on the site, or other suitable drainage
channels. Another suitable drainage system for non -basement retaining includes placing a layer
of free-draining granular material behind the walls, connected to “weep holes” in the face of
the walls.
6.6 Slopes and Drainage
We recommend sloping backfill next to the proposed structures away from the foundation at a
minimum slope of 10H:1V to promote drainage away from the structure. It is our understanding
that stormwater collection ponds or infiltration basins are not part of this project. Therefore,
we have not provided recommendations for soil infiltration rates. We can provide this
information upon request if necessary.
6.7 Backfill and Fill
A wide variety of materials can be considered as suitable for engineered backfill and fill. The
choice of materials is a function of structural requirements, water table conditions, seasonal
construction constraints, placement and compaction methods, and other site or project specific
needs. Soils which classify as SP or SP-SM in the Unified Soil Classification System (ASTM D2487)
are usually the most available suitable soils for engineered backfill and fill.
6.7.1 Recommended Gradation for Engineered Backfill and Fill
Table 5: Recommended Gradation for Engineered Backfill and Fill
Sieve Size Percent Passing
3'' 100
2'' 85-100
3/4'' 71-100
#4 35-100
#200 0-7
Alternative gradations should be evaluated by a geotechnical engineer for acceptability if these
guidelines cannot be satisfied by locally available backfill materials.
6.7.2 Re-using Existing Soils
Existing native sand soils appear to be suitable for re -use as engineered fill. If soils are
encountered during excavation activities that are desired for re -use we recommend that the
suitability be confirmed with laboratory testing of bulk samples
6.7.3 Compaction Standard
We recommend using ASTM D1557 - Modified Proctor as the laboratory compaction standard.
25G2116 12
6.7.4 Density
We recommend compacting each lift to a minimum of the following percentage of the above
compaction standard for the respective types of fill materials:
Table 6: Compaction Recommendation
Type of Engineered Fill % Minimum Compaction
Foundation Structural Backfill 95%
Slab-on-Grade Backfill 95%
Non-structural Foundation Backfill 90%
Utility Trenches 90%
Within 3 Feet of Pavement Section 95%
6.7.5 Lift Thickness
Place engineered backfill and fill materials in lifts not to exceed eight inches in a loose
condition, unless the contractor can demonstrate satisfactory results when placing thicker lifts.
Maximum compacted lift thickness should not exceed 12 inches in a loose condition.
6.7.6 Moisture
In general, granular fill materials should be placed and compacted within two percent of
optimum moisture content, as determined by the above applicable compaction standard.
When fill materials are not in this range of moisture content, compaction to the required
density may be difficult if not impossible. The excavating contractor is responsible for
controlling and adjusting moisture content of backfill materials.
6.8 Parking and Drive Areas
Parking and drive areas at this site will likely be subjected to passenger vehicle traffic and some
truck traffic. As such, pavement sections throughout truck areas are expected to consist of
medium duty sections. Light duty sections may be used in automobile parking areas not
subjected to trucks. It is our understanding that either asphalt (flexible) or concrete (rigid)
pavements may be used.
6.8.1 Preparation
Prior to placing materials in parking or drive areas, the site should be scarified and any
observed soft or organic soils should be fully removed until competent material is encountered.
These areas should be brought to the desired subgrade elevations using compacted engineered
fill. After initial grading procedures, subgrade soils should be proof -rolled and observed by a
geotechnical engineer or designated representative to determine if soft areas are still present.
Any observed soft areas should be removed and replaced with compacted engineered fill to
provide a stable subgrade.
We recommend that a geotextile fabric ( WisDOT type SAS or equivalent) be placed between
the subgrade and the engineered pavement section to provide separation and promote
drainage.
25G2116 13
6.8.2 Pavement Sections
Recommended pavement sections for asphalt pavements are provided below assuming a 20 -
year design life.
Table 9: Recommended Pavement Section – Light Duty
Pavement Type Wear Course
(in)
Non-Wear
Course (in)
Aggregate Base (in) Granular Sub-base
(in)
Asphalt 1 ½ 2 6 10
Table 10: Recommended Pavement Sections – Medium Duty
Pavement Type Wear Course
(in)
Non-Wear
Course (in)
Aggregate Base (in) Granular Sub-base
(in)
Asphalt 2 2 8 12
We recommend using aggregate base meeting the specifications of WisDOT ¾” Dense Graded
Base. Granular subbase should meet the requirements of WisDOT Granular backfill - Grade 1.
Base and subbase should be compacted to 95 percent of their Modified Proctor dry density.
6.8.3 Subgrade Drainage
For drive areas constructed on granular material amongst clay soils, we recommend that
surfaces adjacent to drive and parking areas be properly sloped to promote drainage away from
the site and reduce the potential for creating a “bathtub” effect in roadway areas.
If surface drainage cannot be achieved, we recommend installing drain tile beneath the
pavements in low areas or around catch basins. The drain tile should be routed to a nearby
manhole, daylight, or other suitable collection point.
6.8.4 Maintenance
Achieving the best performance and lifespan of a pavement section requires routine
maintenance throughout the pavement life. We recommend that facility operations include
plans for performing crack sealing and seal coating of pavements as needed.
7 Recommendations for Construction
We offer the following recommendations for use during construction of this project.
7.1 Excavation
7.1.1 Dewatering
Groundwater was not encountered at this site at depths affecting construction. However, if
excavations extend below the hydrostatic groundwater surface an advanced dewatering system
will be required. An experienced dewatering contractor should be contacted for excavations
below the hydrostatic groundwater level.
25G2116 14
7.1.2 Over Sizing
Excavations for the placement of engineered backfill should extend horizontally at least a
minimum of one foot beyond the bottom of footing for every one foot of over excavation depth
required below the footing as shown in Figure 2 below.
Figure 2: Oversizing Example
7.1.3 Frozen Materials
If construction occurs during temperatures below freezing, the base of all excavations and
backfill materials should be protected from freezing. Excavated surfaces which become frozen
should be completely thawed before placing of backfill or pavement. If freezing has loosened
the excavation surface, remove the frozen material to the undisturbed surface. Frozen material
should not be used as backfill.
7.2 Observation
7.2.1 Excavations
Excavation bottoms and engineered fill operations should be observed by a geotechnical
engineer or a designated representative to assure that the recommendations in this report are
being followed. In -place density testing should be performed to document that project
specifications are met.
7.2.2 Foundations
Installation of foundations should be observed and documented by a qualified technician or
engineer. We recommend that at a minimum, concrete be tested for air content, temperature,
slump, and compressive strength.
7.3 Frequency of Testing
For this project, we recommend a minimum density testing frequency of one test per 1,000
square feet of backfill area of backfill and fill (per lift), with a minimum of one test per lift. For
isolated locations or questionable areas, we recommend a minimum of one test per occasion.
25G2116 15
8 Limitations of Evaluation and Report
8.1 Site Variations
We have based the analyses and recommendations submitted in this report in part on the data
obtained from eight (8) SPT borings. The nature and extent of variations at the site will not
become evident until construction. Where major variations appear it will be necessary for us to
re-evaluate the recommendations of this report.
8.2 Design Review
As the geotechnical engineer for this project, we recommend that we be provided an
opportunity to perform a general review of final plans and specifications for this project to
determine that recommendations provided have been properly interpreted and included in the
design. We assume no responsibility for misinterpretation or improper application of our
recommendations and conclusions by others.
8.3 Continuity of Professional Responsibility
We recommend that we be retained to provide geotechnical engineering services during
construction. This would allow us to observe compliance with the plans, compliance with the
specifications and recommendations, provides continuity of professional responsibility, and
allows design changes to be made in the event that subsurface conditions differ from those
anticipated.
8.4 Safe Working Conditions
Responsibility to provide safe working conditions for earthwork and below grade aspects of this
project is solely that of the contractors working on the project. It appears that the on site soils
are generally OSHA Type A and C soils . However, our site exploration was limited to eight
boring locations, and therefore excavations should be evaluated individually at the time of
construction by the contractor. All local, state and federal requirements, statutes, ordinances,
and building codes relating to slopes or temporary sheeting and bracing of trenches and
excavations must be observed during construction.
8.5 Exclusive Use
We have prepared this report for the exclusive use of DSGW Architects for specific application
to the design of the proposed Town of Brule Public Works Garage and Administration Office on
Old Highway 2 in Brule, Wisconsin . Professional services provided to this project by us were
completed, findings obtained, and recommendations prepared using generally accepted
engineering principles and practices. Conclusions and recommendations contained herein are
based upon the applicable standards of our profession at the time this report was prepared. No
warranty, express or implied, is made.
25G2116 16
APPENDIX
Boring Location Map (1 Page)
Boring Logs B-1 through B-8 (8 Pages)
Soil Classification Data/Boring Log Notes (2 Pages)
1234567
8
9
SSSSHSASSHSASSHSASSHSASSHSASSHSASSHSASS
0.3
9.0
26.0
(TOPSOIL) Silty Sand, trace roots and fibers, fine to mediumgrained, dark brown, moist(SP-SM) POORLY GRADED SAND with Silt, trace gravel,trace roots and fibers, fine to medium grained, light brown,moist, very loose to looseno roots and fibers
(SM) SILTY SAND, fine to medium grained, light brown tobrown, moist, loose to medium dense
Boring then Backfilled with Bentonite ChipsEnd of Boring
CLIENT:Town of Brule Public Works GaragePROJECT:
11/14/25
NE WD
AutohammerCAVE IN LEVELWATER LEVEL
SITE LOCATION:DSGW Architecture
RIGSPT HAMMERBORING STARTEDCREW CHIEFCH
WATER LEVEL
DSGW ArchitectureBrule, WisconsinARCHITECT - ENGINEER:
THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPESIN-SITU, THE TRANSITION MAY BE GRADUAL.11/13/25 11/13/25
REPORT DATE:
7822DT
WATER LEVELBORING COMPLETEDABBREVIATIONS: ACR-After Casing Removal, BCR-Before CasingRemoval, AB-After Boring, WD-While Drilling, WS-While Sampling,NE-None Encountered, DB-Diamond Bit, HSA-Hollow Stem Auger,RB-Rock Bit, SS-Split Spoon, ST-Shelby Tube, PA-Power Auger, MR-MudRotary, CS-Continuous, RP-Rock Probe, PH-Percussion Hammer,WL-Water Level, WOH-Weight of Hammer, EIL-Exceeds Instrument Level,TS-Topsoil, PP-Pocket Penetrometer
25G2116
SAMPLE NO.DEPTH (ft)ELEVATION (ft)0.0
10.0
20.0
30.0
101.7
91.7
81.7
71.7
SAMPLE DISTANCEPLASTICLIMIT %
TPT Project No.:
UNCONFINED COMPRESSIVE STRENGTH (TONS/FT2)PERCENT PASSING #200 SIEVE10 20 30 40 501 2 3 4 5
10 20 30 40 50
Page 1 of 1B-1
See Boring Location Map
RECOVERY10 20 30 40 50
DESCRIPTION OF MATERIALWATERCONTENT %LIQUIDLIMIT %
WATER LEVELSAMPLE TYPE
BORING LOCATION:
BORING LOG
STANDARD PENETRATION TEST N-VALUE
BOREHOLE LOG 25G2116 BRULE PUBLIC WORKS.GPJ TWINPORT.GDT 12/5/25
GRAPHIC LOGSURFACE ELEVATION:101.7 ftSTRATA CHANGE DEPTH35571079
13
5
1234567
8
9
SSSSHSASSHSASSHSASSHSASSHSASSHSASSHSASS
0.44.0
9.0
14.0
26.0
(TOPSOIL) Silty Sand, trace roots and fibers, fine to mediumgrained, dark brown, moist(SP-SM) POORLY GRADED SAND with Silt, trace gravel, withroots and fibers, fine to medium grained, brown, moist, veryloose to loose(SP-SM) POORLY GRADED SAND with Silt, fine to mediumgrained, brown, moist, loose(SM) SILTY SAND, fine to medium grained, brown, moist, loose
(SP-SM) POORLY GRADED SAND with Silt, fine grained, lightbrown, moist, loose to medium dense
*silt lenses at 15-20 feet
Boring then Backfilled with Bentonite ChipsEnd of Boring
CLIENT:Town of Brule Public Works GaragePROJECT:
11/14/25
NE WD
AutohammerCAVE IN LEVELWATER LEVEL
SITE LOCATION:DSGW Architecture
RIGSPT HAMMERBORING STARTEDCREW CHIEFCH
WATER LEVEL
DSGW ArchitectureBrule, WisconsinARCHITECT - ENGINEER:
THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPESIN-SITU, THE TRANSITION MAY BE GRADUAL.11/13/25 11/13/25
REPORT DATE:
7822DT
WATER LEVELBORING COMPLETEDABBREVIATIONS: ACR-After Casing Removal, BCR-Before CasingRemoval, AB-After Boring, WD-While Drilling, WS-While Sampling,NE-None Encountered, DB-Diamond Bit, HSA-Hollow Stem Auger,RB-Rock Bit, SS-Split Spoon, ST-Shelby Tube, PA-Power Auger, MR-MudRotary, CS-Continuous, RP-Rock Probe, PH-Percussion Hammer,WL-Water Level, WOH-Weight of Hammer, EIL-Exceeds Instrument Level,TS-Topsoil, PP-Pocket Penetrometer
25G2116
SAMPLE NO.DEPTH (ft)ELEVATION (ft)0.0
10.0
20.0
30.0
102.0
92.0
82.0
72.0
SAMPLE DISTANCEPLASTICLIMIT %
TPT Project No.:
UNCONFINED COMPRESSIVE STRENGTH (TONS/FT2)PERCENT PASSING #200 SIEVE10 20 30 40 501 2 3 4 5
10 20 30 40 50
Page 1 of 1B-2
See Boring Location Map
RECOVERY10 20 30 40 50
DESCRIPTION OF MATERIALWATERCONTENT %LIQUIDLIMIT %
WATER LEVELSAMPLE TYPE
BORING LOCATION:
BORING LOG
STANDARD PENETRATION TEST N-VALUE
BOREHOLE LOG 25G2116 BRULE PUBLIC WORKS.GPJ TWINPORT.GDT 12/5/25
GRAPHIC LOGSURFACE ELEVATION:102.0 ftSTRATA CHANGE DEPTH256681012
12
6
1234567
8
9
SSSSHSASSHSASSHSASSHSASSHSASSHSASSHSASS
0.5
6.5
12.513.015.018.022.526.0
(TOPSOIL) Silty Sand, trace roots and fibers, fine to mediumgrained, dark brown, moist(SP-SM) POORLY GRADED SAND with Silt, trace gravel,trace organics, fine to medium grained, light brown, moist, veryloose to loose(SM) SILTY SAND, trace gravel, fine to medium grained,brown, moist, loose
(ML) SILT with Sand, brown, moist, loose(SM) SILTY SAND, fine to medium grained, brown, moist, loose(ML) SILT with Sand, brown, moist, loose(SM) SILTY SAND, fine to medium grained, brown, moist, loose(ML) SILT with Sand, brown, moist, medium denseBoring then Backfilled with Bentonite ChipsEnd of Boring
CLIENT:Town of Brule Public Works GaragePROJECT:
11/14/25
NE WD
AutohammerCAVE IN LEVELWATER LEVEL
SITE LOCATION:DSGW Architecture
RIGSPT HAMMERBORING STARTEDCREW CHIEFCH
WATER LEVEL
DSGW ArchitectureBrule, WisconsinARCHITECT - ENGINEER:
THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPESIN-SITU, THE TRANSITION MAY BE GRADUAL.11/13/25 11/13/25
REPORT DATE:
7822DT
WATER LEVELBORING COMPLETEDABBREVIATIONS: ACR-After Casing Removal, BCR-Before CasingRemoval, AB-After Boring, WD-While Drilling, WS-While Sampling,NE-None Encountered, DB-Diamond Bit, HSA-Hollow Stem Auger,RB-Rock Bit, SS-Split Spoon, ST-Shelby Tube, PA-Power Auger, MR-MudRotary, CS-Continuous, RP-Rock Probe, PH-Percussion Hammer,WL-Water Level, WOH-Weight of Hammer, EIL-Exceeds Instrument Level,TS-Topsoil, PP-Pocket Penetrometer
25G2116
SAMPLE NO.DEPTH (ft)ELEVATION (ft)0.0
10.0
20.0
30.0
100.3
90.3
80.3
70.3
SAMPLE DISTANCEPLASTICLIMIT %
TPT Project No.:
UNCONFINED COMPRESSIVE STRENGTH (TONS/FT2)PERCENT PASSING #200 SIEVE10 20 30 40 501 2 3 4 5
10 20 30 40 50
Page 1 of 1B-3
See Boring Location Map
RECOVERY10 20 30 40 50
DESCRIPTION OF MATERIALWATERCONTENT %LIQUIDLIMIT %
WATER LEVELSAMPLE TYPE
BORING LOCATION:
BORING LOG
STANDARD PENETRATION TEST N-VALUE
BOREHOLE LOG 25G2116 BRULE PUBLIC WORKS.GPJ TWINPORT.GDT 12/5/25
GRAPHIC LOGSURFACE ELEVATION:100.3 ftSTRATA CHANGE DEPTH3355887
5
15
1234567
8
9
SSSSHSASSHSASSHSASSHSASSHSASSHSASSHSASS
0.5
7.08.5
18.0
26.0
(TOPSOIL) Silty Sand, trace roots and fibers, fine to mediumgrained, dark brown, moist(SM) SILTY SAND, trace gravel, trace roots and fibers, fine tomedium grained, brown, moist, very loose to loose(ML) SILT with Sand, brown, moist, medium dense(SP-SM) POORLY GRADED SAND with Silt, fine to mediumgrained, light brown, moist, loose
(SM) SILTY SAND, fine to medium grained, light brown tobrown, moist, loose
Boring then Backfilled with Bentonite ChipsEnd of Boring
CLIENT:Town of Brule Public Works GaragePROJECT:
11/14/25
NE WD
AutohammerCAVE IN LEVELWATER LEVEL
SITE LOCATION:DSGW Architecture
RIGSPT HAMMERBORING STARTEDCREW CHIEFCH
WATER LEVEL
DSGW ArchitectureBrule, WisconsinARCHITECT - ENGINEER:
THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPESIN-SITU, THE TRANSITION MAY BE GRADUAL.11/13/25 11/13/25
REPORT DATE:
7822DT
WATER LEVELBORING COMPLETEDABBREVIATIONS: ACR-After Casing Removal, BCR-Before CasingRemoval, AB-After Boring, WD-While Drilling, WS-While Sampling,NE-None Encountered, DB-Diamond Bit, HSA-Hollow Stem Auger,RB-Rock Bit, SS-Split Spoon, ST-Shelby Tube, PA-Power Auger, MR-MudRotary, CS-Continuous, RP-Rock Probe, PH-Percussion Hammer,WL-Water Level, WOH-Weight of Hammer, EIL-Exceeds Instrument Level,TS-Topsoil, PP-Pocket Penetrometer
25G2116
SAMPLE NO.DEPTH (ft)ELEVATION (ft)0.0
10.0
20.0
30.0
100.7
90.7
80.7
70.7
SAMPLE DISTANCEPLASTICLIMIT %
TPT Project No.:
UNCONFINED COMPRESSIVE STRENGTH (TONS/FT2)PERCENT PASSING #200 SIEVE10 20 30 40 501 2 3 4 5
10 20 30 40 50
Page 1 of 1B-4
See Boring Location Map
RECOVERY10 20 30 40 50
DESCRIPTION OF MATERIALWATERCONTENT %LIQUIDLIMIT %
WATER LEVELSAMPLE TYPE
BORING LOCATION:
BORING LOG
STANDARD PENETRATION TEST N-VALUE
BOREHOLE LOG 25G2116 BRULE PUBLIC WORKS.GPJ TWINPORT.GDT 12/5/25
GRAPHIC LOGSURFACE ELEVATION:100.7 ftSTRATA CHANGE DEPTH35411976
6
8
12
3
4
5
SSSSHSASSHSASSHSASS
0.5
6.5
9.011.0
(TOPSOIL) Silty Sand, trace roots and fibers, fine to mediumgrained, dark brown, moist(SP-SM) POORLY GRADED SAND with Silt, trace roots andfibers, fine to medium grained, brown, moist, very loose
(SM) SILTY SAND, fine to medium grained, brown, moist,medium dense(SP-SM) POORLY GRADED SAND with Silt, fine to mediumgrained, light brown, moist, medium denseBoring then Backfilled with Bentonite ChipsEnd of Boring
CLIENT:Town of Brule Public Works GaragePROJECT:
11/14/25
NE WD
AutohammerCAVE IN LEVELWATER LEVEL
SITE LOCATION:DSGW Architecture
RIGSPT HAMMERBORING STARTEDCREW CHIEFCH
WATER LEVEL
DSGW ArchitectureBrule, WisconsinARCHITECT - ENGINEER:
THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPESIN-SITU, THE TRANSITION MAY BE GRADUAL.11/14/25 11/14/25
REPORT DATE:
7822DT
WATER LEVELBORING COMPLETEDABBREVIATIONS: ACR-After Casing Removal, BCR-Before CasingRemoval, AB-After Boring, WD-While Drilling, WS-While Sampling,NE-None Encountered, DB-Diamond Bit, HSA-Hollow Stem Auger,RB-Rock Bit, SS-Split Spoon, ST-Shelby Tube, PA-Power Auger, MR-MudRotary, CS-Continuous, RP-Rock Probe, PH-Percussion Hammer,WL-Water Level, WOH-Weight of Hammer, EIL-Exceeds Instrument Level,TS-Topsoil, PP-Pocket Penetrometer
25G2116
SAMPLE NO.DEPTH (ft)ELEVATION (ft)0.0
10.0
100.5
90.5
SAMPLE DISTANCEPLASTICLIMIT %
TPT Project No.:
UNCONFINED COMPRESSIVE STRENGTH (TONS/FT2)PERCENT PASSING #200 SIEVE10 20 30 40 501 2 3 4 5
10 20 30 40 50
Page 1 of 1B-5
See Boring Location Map
RECOVERY10 20 30 40 50
DESCRIPTION OF MATERIALWATERCONTENT %LIQUIDLIMIT %
WATER LEVELSAMPLE TYPE
BORING LOCATION:
BORING LOG
STANDARD PENETRATION TEST N-VALUE
BOREHOLE LOG 25G2116 BRULE PUBLIC WORKS.GPJ TWINPORT.GDT 12/5/25
GRAPHIC LOGSURFACE ELEVATION:100.5 ftSTRATA CHANGE DEPTH22
4
16
12
1234567
SSSSHSASSHSASSHSASSHSASSHSASS
0.5
16.0
(TOPSOIL) Silty Sand, trace roots and fibers, fine to mediumgrained, dark brown, moist(SM) SILTY SAND, fine to medium grained, brown, moist, veryloose to medium dense
trace gravel
Boring then Backfilled with Bentonite ChipsEnd of Boring
CLIENT:Town of Brule Public Works GaragePROJECT:
11/14/25
NE WD
AutohammerCAVE IN LEVELWATER LEVEL
SITE LOCATION:DSGW Architecture
RIGSPT HAMMERBORING STARTEDCREW CHIEFCH
WATER LEVEL
DSGW ArchitectureBrule, WisconsinARCHITECT - ENGINEER:
THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPESIN-SITU, THE TRANSITION MAY BE GRADUAL.11/14/25 11/14/25
REPORT DATE:
7822DT
WATER LEVELBORING COMPLETEDABBREVIATIONS: ACR-After Casing Removal, BCR-Before CasingRemoval, AB-After Boring, WD-While Drilling, WS-While Sampling,NE-None Encountered, DB-Diamond Bit, HSA-Hollow Stem Auger,RB-Rock Bit, SS-Split Spoon, ST-Shelby Tube, PA-Power Auger, MR-MudRotary, CS-Continuous, RP-Rock Probe, PH-Percussion Hammer,WL-Water Level, WOH-Weight of Hammer, EIL-Exceeds Instrument Level,TS-Topsoil, PP-Pocket Penetrometer
25G2116
SAMPLE NO.DEPTH (ft)ELEVATION (ft)0.0
10.0
20.0
99.7
89.7
79.7
SAMPLE DISTANCEPLASTICLIMIT %
TPT Project No.:
UNCONFINED COMPRESSIVE STRENGTH (TONS/FT2)PERCENT PASSING #200 SIEVE10 20 30 40 501 2 3 4 5
10 20 30 40 50
Page 1 of 1B-6
See Boring Location Map
RECOVERY10 20 30 40 50
DESCRIPTION OF MATERIALWATERCONTENT %LIQUIDLIMIT %
WATER LEVELSAMPLE TYPE
BORING LOCATION:
BORING LOG
STANDARD PENETRATION TEST N-VALUE
BOREHOLE LOG 25G2116 BRULE PUBLIC WORKS.GPJ TWINPORT.GDT 12/5/25
GRAPHIC LOGSURFACE ELEVATION:99.7 ftSTRATA CHANGE DEPTH125816910
1234567
SSSSHSASSHSASSHSASSHSASSHSASS
0.5
16.0
(TOPSOIL) Silty Sand, trace roots and fibers, fine to mediumgrained, dark brown, moist(SM) SILTY SAND, trace gravel, trace roots and fibers, fine tomedium grained, brown, moist, very loose to medium dense
*silt lenses at 12 feet
Boring then Backfilled with Bentonite ChipsEnd of Boring
CLIENT:Town of Brule Public Works GaragePROJECT:
11/14/25
NE WD
AutohammerCAVE IN LEVELWATER LEVEL
SITE LOCATION:DSGW Architecture
RIGSPT HAMMERBORING STARTEDCREW CHIEFCH
WATER LEVEL
DSGW ArchitectureBrule, WisconsinARCHITECT - ENGINEER:
THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPESIN-SITU, THE TRANSITION MAY BE GRADUAL.11/14/25 11/14/25
REPORT DATE:
7822DT
WATER LEVELBORING COMPLETEDABBREVIATIONS: ACR-After Casing Removal, BCR-Before CasingRemoval, AB-After Boring, WD-While Drilling, WS-While Sampling,NE-None Encountered, DB-Diamond Bit, HSA-Hollow Stem Auger,RB-Rock Bit, SS-Split Spoon, ST-Shelby Tube, PA-Power Auger, MR-MudRotary, CS-Continuous, RP-Rock Probe, PH-Percussion Hammer,WL-Water Level, WOH-Weight of Hammer, EIL-Exceeds Instrument Level,TS-Topsoil, PP-Pocket Penetrometer
25G2116
SAMPLE NO.DEPTH (ft)ELEVATION (ft)0.0
10.0
20.0
98.3
88.3
78.3
SAMPLE DISTANCEPLASTICLIMIT %
TPT Project No.:
UNCONFINED COMPRESSIVE STRENGTH (TONS/FT2)PERCENT PASSING #200 SIEVE10 20 30 40 501 2 3 4 5
10 20 30 40 50
Page 1 of 1B-7
See Boring Location Map
RECOVERY10 20 30 40 50
DESCRIPTION OF MATERIALWATERCONTENT %LIQUIDLIMIT %
WATER LEVELSAMPLE TYPE
BORING LOCATION:
BORING LOG
STANDARD PENETRATION TEST N-VALUE
BOREHOLE LOG 25G2116 BRULE PUBLIC WORKS.GPJ TWINPORT.GDT 12/5/25
GRAPHIC LOGSURFACE ELEVATION:98.3 ftSTRATA CHANGE DEPTH2478678
1234567
SSSSHSASSHSASSHSASSHSASSHSASS
0.5
9.0
16.0
(TOPSOIL) Silty Sand, trace roots and fibers, fine to mediumgrained, dark brown, moist(SM) SILTY SAND, trace gravel, trace roots and fibers, fine tomedium grained, brown, moist, very loose to loose
not roots and fibers(SP-SM) POORLY GRADED SAND with Silt, fine to mediumgrained, light brown, moist, loose*trace silt lenses
Boring then Backfilled with Bentonite ChipsEnd of Boring
CLIENT:Town of Brule Public Works GaragePROJECT:
11/14/25
NE WD
AutohammerCAVE IN LEVELWATER LEVEL
SITE LOCATION:DSGW Architecture
RIGSPT HAMMERBORING STARTEDCREW CHIEFCH
WATER LEVEL
DSGW ArchitectureBrule, WisconsinARCHITECT - ENGINEER:
THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPESIN-SITU, THE TRANSITION MAY BE GRADUAL.11/14/25 11/14/25
REPORT DATE:
7822DT
WATER LEVELBORING COMPLETEDABBREVIATIONS: ACR-After Casing Removal, BCR-Before CasingRemoval, AB-After Boring, WD-While Drilling, WS-While Sampling,NE-None Encountered, DB-Diamond Bit, HSA-Hollow Stem Auger,RB-Rock Bit, SS-Split Spoon, ST-Shelby Tube, PA-Power Auger, MR-MudRotary, CS-Continuous, RP-Rock Probe, PH-Percussion Hammer,WL-Water Level, WOH-Weight of Hammer, EIL-Exceeds Instrument Level,TS-Topsoil, PP-Pocket Penetrometer
25G2116
SAMPLE NO.DEPTH (ft)ELEVATION (ft)0.0
10.0
20.0
100.4
90.4
80.4
SAMPLE DISTANCEPLASTICLIMIT %
TPT Project No.:
UNCONFINED COMPRESSIVE STRENGTH (TONS/FT2)PERCENT PASSING #200 SIEVE10 20 30 40 501 2 3 4 5
10 20 30 40 50
Page 1 of 1B-8
See Boring Location Map
RECOVERY10 20 30 40 50
DESCRIPTION OF MATERIALWATERCONTENT %LIQUIDLIMIT %
WATER LEVELSAMPLE TYPE
BORING LOCATION:
BORING LOG
STANDARD PENETRATION TEST N-VALUE
BOREHOLE LOG 25G2116 BRULE PUBLIC WORKS.GPJ TWINPORT.GDT 12/5/25
GRAPHIC LOGSURFACE ELEVATION:100.4 ftSTRATA CHANGE DEPTH1227756
BORING LOG NOTES
Water Level
Water levels indicated on the boring logs are as measured at stated times. In c lean sand soils, the elevations indicated
are considered relatively reliable levels. However, in less permeable soils, even after several days of monitoring,
accurate determinations may not be possible. Therefore, additional/alternative methods of groundwater elevation
monitoring should be sought.
Commonly Used Moisture Conditions of Soils
Term Meaning
Dry Requires the addition of considerable mo isture to attain optimum for
compaction
Moist Near optimum moisture for compaction
Wet Requires drying to attain optimum moisture for compaction
Waterbearing Saturated granular soils
Gradation Description and Terminology
Soil Type Particle Name Size Range
Coarse Grained Soils Boulders Over 12”
Cobbles 3”-12”
Gravels #4-3”
Gravels – Coarse ¾”-3”
Gravels – Fine #4-¾”
Sands #200-#4
Sands – Coarse #10-#4
Sands – Medium #40-#10
Sands – Fine #200-#40
Fine Grained Soils Silt 0.005 mm-#200
Clay Less than 0.005 mm
Descriptive Terms of Components Present in Sample (other than ASTM D 2487)
Term Percent of Dry Weight
Trace 1-5%
With 5-12%
Some 12-30%
And 30-50%
Relative Density of Granular Soils
N-Value (SPT) Relative Density Standard “N” Penetration
0-4 Very Loose Blows per foot of a 140 pound hammer
5-10 Loose falling 30” on a 2” outside diameter
11-30 Medium Dense split barrel sampler
31-50 Dense
Over 50 Very Dense
Consistency of Cohesive Soils
N-Value (SPT) Consistency (Q, tsf or kg/cm2)
0-2 Very Soft Less than 0.25
3-4 Soft 0.25-0.50
5-8 Medium 0.50-1.00
9-15 Stiff 1.00-2.00
16-30 Very Stiff 2.00-4.00
Over 30 Hard 4.00-8.00
UNIFIED SOIL CLASSIFICATION SYSTEM – ASTM D 2487
25170 Brule Public Works
Garage
00 40 00 - 1 BID FORMS - INSTRUCTIONS
SECTION 00 40 00
BID FORMS - INSTRUCTIONS
Loose copies or photocopies of the bid form following this Section shall be used by the bidder in
submitting his bid (do not remove the attached forms from this document).
The Bidder shall complete all the following items or the bid may be rejected. (See Sections 00 21 13 and
00 22 13 for additional requirements).
1. Date the Bid.
2. Clearly state the amount of the Base Bid in Written and Numerical Form.
3. Acknowledge receipt of all Addenda.
4. Complete any remaining required items.
5. Sign and indicate current mailing address, telephone and telefax numbers.
6. Include all required prevailing wage rates as related to section 00 22 13 & 00 73 00.
7. Include number of days of construction (schedule).
END OF SECTION
25170 Brule Public Works
Garage
00 41 00 - 1 BID FORM
SECTION 00 41 00
BID FORM
THE PROJECT AND THE PARTIES
1.01 TO:
A. Brule Public Works Garage
Brule, WI
1.02 FOR:
A. BRULE PUBLIC WORKS GARAGE
1.03 DATE: ______________________ (Bidder to enter date)
1.04 SUBMITTED BY: (Bidder to enter name and address)
A. Bidder's Full Name
1. Address
2. City, State, Zip
3. Contact
4. Phone
5. Email
1.05 BASE BID
A. Having examined the Place of The Work and all matters referred to in the Instructions to
Bidders and the Contract Documents prepared by DSGW Architects for the above-mentioned
project, we, the undersigned, hereby offer to enter into a Contract to perform the Work for the
Sum of:
_____________________________________________________________________ dollars
($______________________), in lawful money of the United States of America.
1.06 ACCEPTANCE
A. This offer shall be open to acceptance and is irrevocable for thirty days from the bid closing
date.
B. If this bid is accepted by Owner within the time period stated above, we will:
1. Execute the Agreement within ten days of receipt of Notice of Award.
2. Furnish the required bonds within ten days of receipt of Notice of Award.
3. Commence work within seven days after written Notice to Proceed of this bid.
1.07 CONTRACT TIME
A. Bidder agrees to commence the work after a "Notice to Proceed" has been issued by the
Owner.
B. Contractor to finish the work in ____ weeks.
25170 Brule Public Works
Garage
00 41 00 - 2 BID FORM
1.08 ADDENDA
A. The following Addenda have been received. The modifications to the Bid Documents noted
below have been considered and all costs are included in the Bid Sum.
1. Addendum # _______ Dated ________________.
2. Addendum # _______ Dated ________________.
3. Addendum # _______ Dated ________________.
1.09 OWNERS RIGHT TO REJECT
A. In submitting this Bid, the Bidder understands that the right is reserved by the Owner to reject
any and all Bids, and to waive any informalities and irregularities in the Bids received and to
accept the Bid which, in the Owners judgment, is in the Owners own best interests.
1.10 OWNERS REQUIREMENTS
A. In submitting this Bid, the Bidder must include all information related to Fond du Lac tribal
requirements included in section 00 73 00.
1.11 BID SECURITY
A. Enclosed herewith is a certified check________, cashiers check________, bidders
bond________, (check one), in the amount of: $_______________________________
__________________________________________Dollars ($__________________), being at
least 5% of the amount of the proposal, made payable to the Owner as a proposal guarantee
which it is agreed by the undersigned will be forfeited to the Owner as Liquidated Damage in
the event I (we) fail to enter into a Contract or fail to furnish the required Performance and
Payment Bonds within ten (10) days after received Notice of Award and acceptance of this Bid
by the Owner.
B. If base bid is less than $500,000, leave this section blank.
1.12 BID FORM SIGNATURE(S)
A. The Corporate Seal of
____________________________________________
(Bidder - print the full name of your firm)
was hereunto affixed in the presence of:
____________________________________________
(Authorized signing officer, Title)
(Seal)
____________________________________________
(Authorized signing officer, Title)
END OF BID FORM
25170 Brule Public Works Garage REQUEST FOR APPROVAL
00 43 25 - 1 OF SUBSTITUTIONS
SECTION 00 43 25
REQUEST FOR APPROVAL OF
SUBSTITUTION
Damberg Scott Gerzina Wagner Architects, Inc.
BRULE PUBLIC WORKS GARAGE
DSGW PROJECT NO.: 25170.00
DATE:
BID DATE:
We hereby submit for your consideration the following product to replace the specified item for the above project.
SECTION LINE NO. SPECIFIED ITEM
Proposed Substitution:
[ ] Complete technical data, including laboratory tests, if applicable, is attached (include complete information
on changes to Drawings and/or Specifications which proposed substitution will require for its installation).
Does the substitution affect dimensions shown on Drawings? [ ] Yes [ ] No
If Yes Describe:
Will the undersigned pay for changes to the building design, including Engineering and detailing costs caused by the requested
substitution? [ ] Yes [ ] No
Does substitution affect other trades? [ ] Yes [ ] No
If Yes Describe:
Does substitution impact construction schedule? [ ] Yes [ ] No
If Yes Describe:
Manufacturer's guarantees of the proposed and specified items are different? [ ] Yes [ ] No
(Explain on attachment)
Submitted By: RESPONSE OF ARCHITECT*
[ ] Request is approved subject to
Signature compliance with the Specification
and an Addendum will be issued.
Firm [ ] Approval cannot be granted because
this request did not reach this office
within the specified time.
Address
[ ] Approval cannot be granted at this
Date: time.
Telephone: [ ] Prior Approval for this substitution
is not required by the Specification
Email Address:
By:
*Written response will be made if stamped Signature
self-addressed envelope is submitted with Date:
this request.
END OF SECTION
25170 Brule Public Works Garage 00 72 00 - 1 GENERAL CONDITIONS
SECTION 00 72 00
GENERAL CONDITIONS
FORM OF GENERAL CONDITIONS
1.01 THE GENERAL CONDITIONS APPLICABLE TO THIS CONTRACT IS INCLUDED BY
REFERENCE. A COPY OF THE GENERAL CONDITIONS IS ON FILE AT THE OFFICE OF
THE ARCHITECT FOR THOSE WISHING TO VIEW IT.
RELATED REQUIREMENTS
2.01 AIA DOCUMENT A201, GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION,
2017 EDITION, IS THE GENERAL CONDITIONS BETWEEN THE OWNER AND CONTRACTOR.
SUPPLEMENTARY CONDITIONS
3.01 REFER TO DOCUMENT 00 73 00 - SUPPLEMENTARY CONDITIONS FOR AMENDMENTS TO
THESE GENERAL CONDITIONS.
END OF SECTION
25170 Brule Public Works Garage 00 73 00 - 1 SUPPLEMENTARY CONDITIONS
SECTION 00 73 00
SUPPLEMENTARY CONDITIONS
PART 1 GENERAL
1.01 SUMMARY
1.02 THESE SUPPLEMENTARY CONDITIONS AMEND AND SUPPLEMENT THE GENERAL
CONDITIONS DEFINED IN DOCUMENT 00 72 00 - GENERAL CONDITIONS AND OTHER
PROVISIONS OF THE CONTRACT DOCUMENTS AS INDICATED BELOW. PROVISIONS THAT
ARE NOT SO AMENDED OR SUPPLEMENTED REMAIN IN FULL FORCE AND EFFECT.
1.03 THE TERMS USED IN THESE SUPPLEMENTARY CONDITIONS THAT ARE DEFINED IN THE
GENERAL CONDITIONS HAVE THE MEANINGS ASSIGNED TO THEM IN THE GENERAL
CONDITIONS.
1.04 MODIFICATIONS TO GENERAL CONDITIONS
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
MODIFICATIONS TO AIA A201
4.01 ARTICLE 1.1.1 - THE CONTRACT DOCUMENTS
A. Add the following sentence to the end of Subparagraph 1.1.1:
1. The Contract Documents executed or identified in accordance with Subparagraph 1.5.1
shall prevail in case of an inconsistency with subsequent versions made through
manipulatable electronic operations involving computers.
4.02 ARTICLE 1.2 - CORRELATION AND INTENT OF THE CONTRACT DOCUMENTS
A. Add the following Subparagraph 1.2.4 to Paragraph 1.2:
B. 1.2.4: If there is an inconsistency in the quality or quantity of Work required by the Contract
Documents, the greater quality or quantity of Work indicated shall be provided in accordance
with the Architect's interpretation, and no change in the Contract Sum will be permitted.
4.03 ARTICLE 1.5 - OWNERSHIP AND USE OF DRAWINGS, SPECIFICATIONS AND OTHER
INSTRUMENTS OF SERVICE
A. Add the following Subparagraph 1.5.3 to Paragraph 1.5:
1. 1.5.3 Contractor's Use of Instruments of Service in Electronic Form.
2. 1.5.3.1The Architect may, with the concurrence of the Owner, furnish to the Contractor
versions of instruments of Service in electronic form. The Contract Documents executed
or identified in accordance with Subparagraph 1.5.1 shall prevail in case of an
inconsistency with subsequent versions made through manipulatable electronic operations
involving computers.
3. 1.5.3.2The Contractor shall not transfer or reuse instruments of Service in electronic or
machine readable form without prior written consent of the Architect.
4.04 ARTICLE 4.2 - ARCHITECTS ADMINISTRATION OF THE CONTRACT
A. Add clause 4.2.2.1 to Subparagraph 4.2.2:
1. 4.2.2.1The Contractor shall reimburse the Owner for compensation to the Architect for
additional site visits made necessary by the fault, neglect or request of the Contractor.
4.05 ARTICLE 11.1 CONTRACTORS INSURANCE AND BONDS
A. ADD the following Subparagraphs to 11.1.2:
B. Add the following Clauses 11.1.2.2 through 11.1.2.2.3 to Subparagraph 11.1.2:
1. 11.1.2.2: The limits for Worker's Compensation and Employers' Liability insurance shall
meet statutory limits mandated by State and Federal Laws. If (1) limits in excess of those
required by statute are to be provided or (2) the employer is not statutorily bound to obtain
such insurance coverage or (3) additional coverages are required, additional coverages
and limits for such insurance shall be as follows:
25170 Brule Public Works Garage 00 73 00 - 2 SUPPLEMENTARY CONDITIONS
2. 11.1.2.2.1: The limits for Commercial General Liability insurance including coverage for
Premises-Operations, Independent Contractors' Protective, Products -Completed
Operations, Contractual Liability, Personal Injury and Broad Form Property Damage
(including coverage for Explosion, Collapse, and Underground Hazards) shall be as
follows:
a. $1,000,000 Each Occurrence
b. $1,000,000 General Aggregate
c. $1,000,000 Personal and Advertising Injury
d. $1,000,000 Products-Completed Operations Aggregate
.1: The policy shall be endorsed to have the General Aggregate apply to this Project
only.
.2: The Contractual Liability Insurance shall include coverage sufficient to meet the
obligations in AIA Document A201-2017.
.3: Products and Completed Operations Insurance shall be maintained for a period
of at least (1) year(s) after either 90 days following Substantial Completion or
final payment whichever is earlier.
3. 11.1.2.2.2: Automobile Liability insurance (owned, non-owned and hired vehicles) for
bodily injury and property damage shall be as follows:
a. $1,000,000 Each Accident
4. 11.1.2.2.3: Umbrella or Excess Liability coverage shall be as follows:
a. $1,000,000 Each Occurrence
4.06 ARTICLE 11.1.3 - CONTRACTORS LIABILITY INSURANCE
A. Add the following sentence to Subparagraph 11.1.3:
1. If this insurance is written on a Commercial General Liability policy form, the certificates
shall be ACORD form 25-S, completed and supplemented in accordance with AIA
Document G715, Instruction Sheet and Supplemental Attachment for ACORD Certificate
of Insurance 25-S.
4.07. ADDITIONAL LAWS AND REGULATIONS
A. The Bidder's attention is directed to the fact that all applicable State laws, County and
municipal ordinances and the Rules and Regulations of all authorities having jurisdiction
over the construction of the project shall apply to the contract throughout and they will be
deemed to be included in the Contract the same as though written.
B. The bidders shall account for most recent edition of Prevailing Wage Rates set forth by the
State of Wisconsin Douglas County.
1.
https://dwd.wisconsin.gov/er/laborstandards/prevailingwage/
C. The bidders shall account for most recent edition of Prevailing Wage Rates set forth by the
U.S. Department of Labor.
D. Project is Tax-Exempt.
END OF SECTION
25170 Brule Public Works Garage 01 10 00 - 1 SUMMARY
SECTION 01 10 00
SUMMARY
PART 1 GENERAL
1.01 PROJECT
A. Project Name: Brule Public Works Garage
B. Owner: City of Brule
C. Architect's Name: DSGW Architecture
1. 2 West First Street, Suite 201
2. Duluth, MN 55802
3. Phone: 218-727-2626
D. Structural Engineer: Northland Consulting Engineers L.L.P.
1. 102 South 21st Avenue West, Suite 1
2. Duluth, MN 55806
3. Phone: 218-727-5995
E. Civil/Mechanical/Electrical Engineer: Windsor Engineers
1. 4802 Oneota St Suite 2
2. Duluth, MN 55807
3. Phone: 612-389-1658
F. The Project consists of a new commercial transportation garage building for the City of Brule in
Brule, Wisconsin. The work includes construction of a Pre-Engineered Metal Building.
Construction includes but is not limited to: foundation work for structure, concrete, minimum
steel/metals work, carpentry/woods/plastics and composites, thermal properties, openings,
finishes, specialties, furnishings, mechanical, electrical, plumbing, and civil work. See drawings
and specifications herein. Coordinated work to be in compliance with most recent prevailing wage
rates and the requirements of the State of WI building code requirements. Project is Tax-exempt.
1.02 CONTRACT DESCRIPTION
A. Contract Type: A single prime contract based on a Stipulated Price as described in the
drawings and specifications.
B. These Specifications with the accompanying Drawings are intended to describe and illustrate
all work necessary to carry out the work of the project listed.
1. Provide labor, materials articles, equipment, incidentals, items, tools, services, supplies,
methods, operations, skills in such quantities as may be necessary to complete Project
within the intent of the Contract Documents. Singular notations shall be considered plural
where plural application is reasonably inferable. Mention or indication of extent of work
under any work Division or Specification Section is done only for convenience of
Contractor and shall not be construed as describing all work required under that Division
or Section.
2. Drawings: The List of Drawing Sheets is included in Section 00 01 15. Contractors and all
Subcontractors shall be bound by the information and requirements provided by the
complete set of Drawings. Individual Detail Sheets shall be considered with and as a part
of the Drawings and the overall Contract Documents.
3. The Divisions and Sections of the Technical Specifications primarily apply to the various
trade divisions, but Contractor and all Subcontractors shall be bound to the information
and requirements of the complete set of Specifications.
4. Other Requirements: The requirements of all Sections of Divisions 00 and 01 apply to and
shall govern the Contractor and all Subcontractors for this Project. Supplementary
General Conditions and all Sections Division 01 shall govern Work of all technical
Sections. Where provisions and requirements are referred to as the responsibility of the
Contractor or a particular Subcontractor, he shall have the primary responsibility to
accomplish, provide, assume, and enforce, but the Contractor and all Subcontractors shall
be governed by the requirements and cooperate fully in fulfilling the requirements.
25170 Brule Public Works Garage 01 10 00 - 2 SUMMARY
5. Examination of Site and Documents: In submitting a bid and in accepting a Contract
award, the Contractor represents he has examined the site, existing conditions as well as
the entire set of documents, in accordance with the General Conditions and agrees to be
bound by all conditions of the site, existing conditions, and all documents, without
additional cost.
1.03 DESCRIPTION OF ALTERATIONS WORK
A. Scope of demolition and removal work is shown on drawings and specified in Section 02 41 00.
Design intent is to match that of existing conditions/systems.
1.04 WORK BY OWNER
A. Refer also to document 00 72 00, General Conditions, Article 6.1.
B. The Owner reserves the right to let other contracts in connection with this Project. This
Contractor shall afford other contractors reasonable opportunity for the introduction and storage
of their materials and execution of their work, and shall properly connect and coordinate his
work with theirs.
C. The Owner reserves the right to jointly occupy the premises with the Contractor in the
performance of his duties and functions. The Owner also reserves the right to: enter into the
Project and premises at all times; make installations of materials and equipment at appropriate
times as the Work progresses; install equipment, furniture, and furnishings when spaces are at
appropriate stages of completion. Contractor shall coordinate work with the Owner and
cooperate with the Owner to minimize undue interferences.
D. If any part, unit, phase, or the entire Project is substantially complete or ready for occupancy,
the Owner may, upon notice to the Contractor, and without prejudice to any of the rights of the
Owner or Contractors, enter into and make use of the Work that is substantially complete.
1.05 OWNER OCCUPANCY
A. Owner intends to occupy the Project upon Substantial Completion.
B. Cooperate with Owner to minimize conflict and to facilitate Owner's operations.
C. Schedule the Work to accommodate Owner occupancy.
1.06 CONTRACTOR USE OF SITE AND PREMISES
A. Do not infringe on areas outside of the established construction limits indicated on Drawings or
designated by the Owner without permission of the Owner. Arrange temporary easements
which may be required for construction operations, maintain safety precautions, and return to
original conditions upon completion of the Contract. The Owner may caution Contractor about
conditions which they observe, but shall not be held responsible to provide such advice or for
enforcing any protection.
B. Contractors and all other persons connected with this project shall only use parking areas
approved.
C. Contractors shall use and maintain in clean condition site access route as designated. No other
access shall be used for vehicles or men.
D. Move any stored products which interfere with operations of Owner or other Contractors.
E. Do not load structures with weights which will endanger the structure.
F. Maintain site in safe condition and keep free of construction materials and debris.
G. Maintain fire protection and access at all times. Permit immediate access by firefighting
equipment.
H. Hazardous Protection: Warning signals, barricades and other protective measures for hazard
shall be in place or operate 24 hours per day.
I. The Contractor shall do all patching of existing property on or adjacent to the site, including but
not limited to: walks, pavements, roadways, structures, and utilities which are cut or damaged
by construction and are not designated for removal, relocation or replacement in the course of
the construction.
J. Work occurring on public property shall be constructed in accordance with all laws, ordinances,
rules, regulations and orders of any public authority having jurisdiction.
25170 Brule Public Works Garage 01 10 00 - 3 SUMMARY
K. Site Management Requirements:
1. The Prime Contractor shall coordinate all work on site with the Owner and Architect.
2. General: Upon commencement of the Work at the site, the Prime Contractor shall assume
the site management at areas within construction limits as agreed to by the Owner and
Contractor, other areas where work is to be performed and adjacent storage areas, to
provide proper direction to all contractors, subcontractors and workmen. Site management
shall be coordinated with the Owner and shall include maintaining areas as specified and
required to be free of construction activity, parking and storage where it is necessary to
provide clear access and areas for the Owner's functions.
3. Responsibilities: Site management and maintenance shall include, but not be limited to:
enforcement of access, parking, delivery, storage, noise and other restrictions;
maintenance of fences in good condition; providing and maintaining temporary facilities as
specified; dewatering the excavations, except water in trenches and excavations made by
subcontractors solely for their own work; protection of adjacent structures as may be
damaged caused by water; overall fire and safety management; protection for site
features to remain; temporary partitions, closures, dust barriers and similar to separate
work areas in existing building spaces; and similar overall or general management of the
site and adjacent public and other property to fulfill the obligations of this Contract.
4. Fencing: Not applicable.
5. Use of Streets: Where the conduct of the work requires the obstruction or use of a
roadway or parking lot, it shall be the responsibility of the respective Contractor to secure
all necessary permission from the Owner. Contractors shall be responsible for the
protection of the public in the vicinity of the work and nothing in these specifications shall
be construed to relieve him of said responsibility. Protective devices shall conform to the
requirements of the Highway Department having jurisdiction and/or the proper public
authorities and shall be installed as required by the Owner.
L. Provide access to and from site as required by law and by Owner:
1. Emergency Building Exits During Construction: Keep all exits required by code open
during construction period; provide temporary exit signs if exit routes are temporarily
altered.
2. Do not obstruct roadways, sidewalks, or other public ways without permit.
1.07 WORK SEQUENCE
A. Schedule Information:
1. The Notice to Proceed will not be issued until Owner and Architect have reviewed and
approved all bidding information.
B. Begin work when scheduled by general contractor to achieve substantial completion as
scheduled to prevent delay in the work by others.
C. Deviations in the schedule must be authorized by the architect and owner.
D. Time Set by Schedule: Where the constraints, completion and timing of Work specified in this
or other Sections do not have specific dates or time imposed by the Contract Documents, they
shall be considered and incorporated as established dates in the final Construction Schedule of
the Prime Contractor. Where the activity affects the Owner, the time or dates established in the
construction schedule shall be maintained, as the Owner will plan his activities accordingly.
E. Other Considerations: In addition to the time of commencement, substantial completion and
final completion dates, all other events, fasteners, and constraints shall be carefully considered
in establishing the work program and schedule of the Project. The Contractor and
subcontractors shall work closely in timing of operations and shall have materials, equipment
and other elements ready to be able to immediately fulfill their obligations in the overall
schedule.
F. Final Completion: Within 10 days after substantial completion.
25170 Brule Public Works Garage 01 10 00 - 4 SUMMARY
G. Time of Completion:
1. The Contractor agrees that said work shall be prosecuted regularly, diligently, and
uninterruptedly at such rate of progress as will ensure full completion thereof within the
time specified. It is expressly understood and agreed, by and between the Contractor and
the Owner, that the time for completion of the same, taking into consideration the average
climatic range and usual industrial conditions prevailing in this locality.
2. Delays and Extension of Time: All time limits stated in the Contract Documents are of the
essence of the Contract. The Contractor may be granted an extension of time and/or relief
of Liquidated Damages because of causes beyond the Contractor's control which
constitute a justifiable delay. The Owner will extend the time subject to the following
provisions:
a. Claims for extension of time shall be made per Article 8 of the GENERAL
CONDITIONS.
b. Written notice of the delay, an explanation of the cause and an estimate of the length
of delay shall be forwarded to the Architect within five days of the beginning of such
delay.
c. Claims for extension of time shall be stated in numbers of whole calendar days. The
actual dates on which the delay(s) occurred must be stated. In the case of claims for
extension of time because unusual inclement weather prevented the execution of
major items of the Work on normal working days, calendar days shall be computed
by multiplying normal work days (five days per week) by a factor of 1.4. Contractor
must provide documentation of all weather related delays and claims for the
extension will be allowed only if the weather is distinctly out of line with the ten year
average.
d. Any claim for extension of time for strikes or lockouts shall be supported by a
situation of facts concerning the strike, including but not limited to, the dates, the craft
concerned, and the reason for the strike, efforts to resolve the dispute, and efforts to
minimize the impact of the strike in progress.
e. Any claims for extension of time for delays in transportation or for failure of suppliers
shall be supported by a citation of facts demonstrating that the delays are beyond the
Contractor's control, including, but not limited to, his efforts to overcome such delays.
f. The time extensions for changes in the Work will depend upon the extent, if any, by
which the changes cause delay in the completion of various elements of construction.
g. A Change Order granting the time extension may provide that the Contract
Completion Date will be extended only for those specific elements so delayed and
that the remaining work will not be altered. Further, the amended completion date
shall be of essence to this contract and shall be subject to the same conditions as the
original completion time.
3. Project Schedule:
a. General: The General Contractor shall prepare the Final Contractors Construction
Schedule for the Work. The location and nature of the Project, the requirement to
maintain the operation, functions, and services of the Owner dictates careful
planning, scheduling and close cooperation between the Contractor, subcontractors
and the Owner. The Contractor shall keep the Owner advised of his intended
operations and schedule and be guided by other constraints or timing of work that
may develop during construction. It is the intent of the Owner to cooperate as far as
possible to minimize hampering of operations and the Contractor may suggest
schedules and timing which will facilitate progress.
b. Within ten work days after award of the Contract, prepare, submit and review with the
Owner and Architect a detailed schedule addressing work activities and estimate
duration of the activities. This schedule shall be prepared in such detail and form as
the Architect may require and will be subject to the Approval of the Architect and
Owner.
25170 Brule Public Works Garage 01 10 00 - 5 SUMMARY
c. In general, the schedule shall indicate the various phases of work coordinated and
integrated time-wise with the other work. The schedule shall also indicate the various
activities of each of the areas, stages, and phases of work, with integrated and
coordinated commencement and completion times. After review by the Owner,
including any revised sequencing proposed by the Contractor or Owner to improve
the progress or minimize the disruption of the Owner's functions, the Contractor shall
revise the schedule as the "final" schedule, which will provide the planning
information for the Owner's relocation and other operations.
d. Submit schedule updates and Material Status Report updates with applications of
payments as requested by the Architect.
e. Furnish manpower staffing information as requested by the Owner or Architect.
f. Coordinate the letting of subcontracts, material purchases, shop drawings
submissions, delivery of materials, sequence of operations, etc., to conform to the
Project Schedule and furnish proof of same as may be required by the Architect.
g. Revise and periodically update the Project Schedule as necessary to conform to the
current status of the project and furnish copies to the Owner, Architect, and
subcontractors.
4. Commencement of Work:
a. No Contractor shall commence Work nor allow any Subcontractor or Sub-
subcontractor to commence the Work until:
1) The Contract has been fully executed; and the Owner, has issued a Notice to
Proceed.
2) The Owner has approved evidence of the Contractor's Liability Insurance and
any other insurance required to be purchased by the Contractor.
5. Performance/Payment Bond: Required
6. Other Bonds, Permits, Fees:
a. The GENERAL CONTRACTOR shall secure and pay the cost of the building permit
for the Project. Included will be the building permit fees, plan check fees, State
surcharge, and other fees customarily charged for the building permit.
b. The GENERAL CONTRACTOR shall secure and pay any additional costs for the
Certificate of Occupancy for the Project.
c. Each CONTRACTOR OR SUBCONTRACTORS shall secure and pay for all other
bonds, permits, governmental fees, license and inspections required necessary for
the proper execution and completion of this work.
7. Layout of the Work:
a. The PRIME CONTRACTOR shall be responsible for and shall assist Subcontractors
and Prime Trade Contractors in the location of walls, partitions, columns, beams,
floors, ceilings, and openings therein where their work must be located and placed
prior to the erection of these items.
b. The Contractor and/or Subcontractor is responsible for the accuracy with respect to
layout of their work. Immediately report any perceived discrepancies or errors in the
Drawings to the Architect and make adjustments in accordance with instructions
given by the Architect.
c. The contractor and subcontractor shall recognize that the drawings necessarily are
diagrammatic in many instances. All work and in particular exposed piping, ducts,
conduit and similar items shall be neatly and carefully laid out to provide the most
useful space utilization and the most orderly appearance. Piping and similar work
shall be installed as close to ceilings and walls as conditions permit, located to
prevent interference with other work or with the use of the spaces in the manner
required by the functions of the room and staff. Valves shall be located in
inconspicuous but accessible places. Before proceeding with any work, particularly
where exposed, the Contractor shall carefully plan the layout and review it with the
Architect for acceptability of location.
8. Openings, Blocking, Backing and Grounds:
a. Each Trade Contractor shall be responsible for providing backing and grounds in all
walls and above ceilings necessary for the installation of all contracted work.
25170 Brule Public Works Garage 01 10 00 - 6 SUMMARY
b. Make suitable preparations for the hangers, inserts, anchors, grounds and supports
that are to be embedded in concrete, masonry walls, floors, partitions or structural
members, or that are to pass through or be attached thereto. Provide and install
proper sleeves, boxes, receptacles or chases for all openings or recesses to receive
work occurring in or passing through any such members, all of which shall be located
accurately and secured firmly in place before any such masonry has been erected,
concrete poured or walls/ceilings enclosed.
9. Field Dimensions: The need to obtain accurate file dimensions in ample time to permit
fabrication of materials and equipment, for delivery and installation in accordance with the
schedule, shall be recognized. Each Contractor and all subcontractors shall cooperate in
completing work phases to accommodate the schedule for obtaining dimensions and to
prevent fabrication delay. In the event it is impractical to have work in place to permit field
dimensions, the Contractor shall guarantee necessary dimensions, before construction, to
the various fabricators and be responsible to ensure the dimensions.
10. Reference to Standards and Codes:
a. Notice of Variance: If a Contractor observes that the drawings and specifications are
at variance with any applicable code or regulation of a governmental unit having
authority, he shall promptly notify the Architect in writing, and any necessary changes
shall be adjusted as provided in the Contract for Changes in the Work. If a Contractor
performs any work knowing it to be contrary to such laws, ordinances, rules and
regulations, and without such notice to the Architect, he shall bear all costs and
damages arising therefrom.
b. Reference Standards: For products specified by association or trade standards,
comply with requirements of the standard, except when more rigid requirements are
specified or are required by applicable codes and other standards.
c. Effect of Standards: The standards referred to, such as ASTM, Federal
Specifications, NFPA and similar standards, shall have full force and effect as though
printed in the Specifications, except as modified in the Specification. These standards
are not furnished to bidders and Contractors as it is assumed that these standards
are readily available and that the manufacturers and trades involved are familiar with
their requirements.
d. Date of Standard: Any material specified by reference to the number, symbol or title
of a specific standard, such as ASTM, Commercial Standard, a Federal Specification,
a trade association standard, or other similar standard, shall comply with the
requirements in the latest revision thereof and any amendment or supplement thereto
in effect on the date of the Contract Documents, unless otherwise noted.
e. Certificate: For products specified in accordance with a Federal Specification, ASTM
Standard, American National Standards Institute or similar association standards,
upon request the Contractor shall provide an acceptable affidavit by independent
testing laboratory or other source approved by the Architect, certifying that product
furnished for this Project complies with the particular standard specifications. Where
necessary, requested or specified, supporting test data shall be submit to
substantiate compliance. The manufacturer is subject to Architect's acceptance.
11. Coordination Requirements:
a. General: The nature of the Project makes it imperative the Contractor and all
subcontractors and prime trade contractors coordinate their work and cooperate with
each other and the Owner from the start of the Project to completion. PRIME
CONTRACTOR shall be the Prime Coordinator for the Project and shall establish the
overall schedule for the progress of the Project, the sequence of completion and
general use of the site.
b. Off-Site Fabrication: With the restricted site, off site fabrication is encouraged as
much as possible and schedule of deliveries so materials and equipment can be
installed immediately after delivery. The Project Coordination Administrator shall alert
and advise subcontractors and suppliers of the need to hold deliveries until they are
notified the materials are required on the site.
25170 Brule Public Works Garage 01 10 00 - 7 SUMMARY
c. Equipment: With respect to mechanical and electrical features of equipment,
complete data must be exchanged directly between the Contractors and
subcontractors involved as the progress of the Project requires. The person
requesting the information shall advise when it will be required. The suppliers of
equipment are expressly required to provide large scale layout drawings showing the
required rough-in locations of all services (dimensioned from building features)
service characteristics. In the event of incorrect, incomplete, delayed or improperly
identified information, the party causing the delay or error shall be responsible and
pay for any modifications or replacements necessary to provide a correct, proper and
new installation, including relocations required.
1.08 GENERAL PROTECTION AND SAFETY
A. General: In accordance with best construction practices, the Prime Contractor shall be
responsible for conditions of the job site, including safety of all persons and property affected
directly or indirectly by his operations during the performance of the Work. This requirement
shall apply continuously 24 hours per day until acceptance of the Work by the Owner and shall
not be limited to normal working hours.
1.09 PHOTOGRAPHS / PRESS RELEASES
A. Do not take, or cause any photographs to be taken at the job site without prior approval of the
Owner / Architect.
B. Do not issue any press releases or disseminate information concerning the project to the news
media without prior approval of the Owner / Architect.
1.10 WORKING HOURS
A. This project shall be scheduled by the Prime Contractor to operate on a 5-day, 40-hour per
week basis. Contractors employing trades who work other than the above hours must provide
for coordination of their work as it relates to the work of other trades which work the above
hours at no additional cost to the Owner. This schedule may be changed or modified with the
approval of the Owner / Architect.
1.11 HAZARDOUS MATERIAL REMOVAL
A. If during the construction of the Project hazardous material is suspected or encountered by the
Contractor, the Contractor shall promptly notify the Architect and the Owner, with their own
forces or by separate contract, shall be responsible for complete removal and disposition of the
hazardous material.
B. If the Contractor claims that delay and additional cost is involved because of this action, they
shall make claim as provided elsewhere in the Contract Documents.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
END OF SECTION
25170 Brule Public Works Garage 01 20 00 - 1 PRICE AND PAYMENT
PROCEDURES
SECTION 01 20 00
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Procedures for preparation and submittal of applications for progress payments.
B. Documentation of changes in Contract Sum and Contract Time.
C. Change procedures.
1.02 RELATED REQUIREMENTS
A. Document 00 72 00 - General Conditions and Document 00 73 00 - Supplementary Conditions:
Additional requirements for progress payments, final payment, changes in the Work.
1.03 SCHEDULE OF VALUES
A. Electronic media printout including equivalent information will be considered in lieu of standard
form specified; submit sample to Architect for approval.
B. Forms filled out by hand will not be accepted.
C. Submit Schedule of Values in triplicate within 15 days after date of Owner-Contractor
Agreement.
D. Format: Utilize the Table of Contents of this Project Manual. Identify each line item with number
and title of the specification Section. Identify site mobilization and bonds and insurance.
E. Include in each line item, the amount of Allowances specified in this section. For unit cost
Allowances, identify quantities taken from Contract Documents multiplied by the unit cost to
achieve the total for the item.
F. Include within each line item, a direct proportional amount of Contractor's overhead and profit.
G. Revise schedule to list approved Change Orders, with each Application For Payment.
1.04 APPLICATIONS FOR PROGRESS PAYMENTS
A. Payment Period: Submit at intervals stipulated in the Agreement.
B. Electronic media printout including equivalent information will be considered in lieu of standard
form specified; submit sample to Architect for approval.
C. Forms filled out by hand will not be accepted.
D. Execute certification by signature of authorized officer.
E. Use data from approved Schedule of Values. Provide dollar value in each column for each line
item for portion of work performed and for stored Products.
F. Round off all figures on all progress payments to the nearest dollar, any adjustment required
shall be made on the final application for payment.
G. List each authorized Change Order as a separate line item, listing Change Order number and
dollar amount as for an original item of Work.
H. Submit three copies of each Application for Payment. Upon review and approval, the Architect
will sign and forward three (3) copies to the Owner with their recommendations.
I. Include the following with the application:
1. Affidavits attesting to off-site stored products.
a. No payment will be made to a contractor on account of materials and equipment in
transit or stored at off site locations unless prior approval is received from the Owner
and Architect. Proof of proper insurance must be submitted for materials stored of
site before approval will be considered.
25170 Brule Public Works Garage 01 20 00 - 2 PRICE AND PAYMENT
PROCEDURES
2. Lien Waivers: Will be required for each payment request by each Contractor and
Subcontractor. First lien waivers to be submitted with Payment Request No. 2 covering
payment for Payment Request No. 1. They shall then continue with subsequent payment
requests covering the preceding payment.
a. With submission of the final payment request, or upon request for reduction of
retainage, the Contractor shall provide lien waivers from all subcontractors and
suppliers covering all dollar amounts for which a lien waiver has not yet been
submitted.
3. Payroll Records: Will be required for each pay request by each Contractor and
Subcontractor carrying out work on the site. Each application for payment submitted shall
be accompanied by payroll records current to within twenty-one (21) days of the date of
the application.
a. Final payment to a contractor will not be made until payroll records are submitted
covering completed project.
J. When Architect requires substantiating information, submit data justifying dollar amounts in
question. Provide one copy of data with cover letter for each copy of submittal. Show
application number and date, and line item by number and description.
1.05 RETAINAGE
A. To ensure the proper performance of the Contract, the Owner will retain FIVE PERCENT of the
amount of each Certificate for Payment issued by the Architect. Such amount will be retained
by the Owner until Substantial Completion. At substantial completion the withholding amount
will be reduced to Two Percent.
B. In event of a very minor amount of work, incomplete or not corrected due to weather, unsuitable
conditions for testing or similar conditions preventing the General Contractor from proceeding,
the retained amount may be reduced to three times the value of the incomplete work upon
recommendation of the Architect and approved by the Owner.
1.06 MODIFICATION PROCEDURES
A. For minor changes not involving an adjustment to the Contract Price or Contract Time, Architect
will issue instructions directly to Contractor.
B. For other required changes, Architect will issue a document signed by Owner instructing
Contractor to proceed with the change, for subsequent inclusion in a Change Order.
1. The document will describe the required changes and will designate method of
determining any change in Contract Sum or Contract Time.
2. Promptly execute the change.
C. For changes for which advance pricing is desired, Architect will issue a document that includes
a detailed description of a proposed change with supplementary or revised drawings and
specifications, a change in Contract Time for executing the change with a stipulation of any
overtime work required and the period of time during which the requested price will be
considered valid. Contractor shall prepare and submit a fixed price quotation within 10 days.
D. Contractor may propose a change by submitting a request for change to Architect, describing
the proposed change and its full effect on the Work, with a statement describing the reason for
the change, and the effect on the Contract Sum and Contract Time with full documentation and
a statement describing the effect on Work by separate or other contractors. Document any
requested substitutions in accordance with Section 01 60 00.
E. Computation of Change in Contract Amount: As specified in the Agreement and Conditions of
the Contract.
1. For change requested by Architect for work falling under a fixed price contract, the amount
will be based on Contractor's price quotation.
2. For change requested by Contractor, the amount will be based on the Contractor's request
for a Change Order as approved by Architect.
3. For pre-determined unit prices and quantities, the amount will based on the fixed unit
prices.
25170 Brule Public Works Garage 01 20 00 - 3 PRICE AND PAYMENT
PROCEDURES
4. For change ordered by Architect without a quotation from Contractor, the amount will be
determined by Architect based on the Contractor's substantiation of costs as specified for
Time and Material work.
F. Substantiation of Costs: Provide full information required for evaluation.
1. Provide following data:
a. Quantities of products, labor, and equipment.
b. Taxes, insurance, and bonds.
c. Overhead and profit.
d. Justification for any change in Contract Time.
e. Credit for deletions from Contract, similarly documented.
2. For Time and Material work, submit itemized account and supporting data after completion
of change, within time limits indicated in the Conditions of the Contract.
G. Percentages allowed for Overhead and Profit shall be as listed in the Supplementary General
Conditions, Section 00 73 00.
H. Execution of Change Orders: Architect will issue Change Orders for signatures of parties as
provided in the Conditions of the Contract.
I. After execution of Change Order, promptly revise Schedule of Values and Application for
Payment forms to record each authorized Change Order as a separate line item and adjust the
Contract Sum.
J. Promptly revise progress schedules to reflect any change in Contract Time, revise
sub-schedules to adjust times for other items of work affected by the change, and resubmit.
K. Promptly enter changes in Project Record Documents.
1.07 APPLICATION FOR FINAL PAYMENT
A. Prepare Application for Final Payment as specified for progress payments, identifying total
adjusted Contract Sum, previous payments, and sum remaining due.
B. Application for Final Payment will not be considered until the following have been
accomplished:
1. All closeout procedures specified in Section 01 70 00.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
END OF SECTION
25170 Brule Public Works Garage 01 30 00 - 1 ADMINISTRATIVE REQUIREMENTS
SECTION 01 30 00
ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Preconstruction meeting.
B. Progress meetings.
C. Construction progress schedule.
D. Coordination drawings.
E. Submittals for review, information, and project closeout.
F. Number of copies of submittals.
G. Submittal procedures.
1.02 RELATED REQUIREMENTS
A. Document 00 72 00 - General Conditions: Dates for applications for payment.
B. Document 00 73 00 - Supplementary Conditions: Duties of the General Contractor.
C. Section 01 10 00 - Summary: Stages of the Work, Work covered by each contract, occupancy.
D. Section 01 70 00 - Execution and Closeout Requirements: Additional coordination requirements.
E. Section 01 78 00 - Closeout Submittals: Project record documents.
1.03 PROJECT COORDINATION
A. Project Coordinator: General Contractor.
B. Cooperate with the Project Coordinator in allocation of mobilization areas of site; for field offices
and sheds, for site access, traffic, and parking facilities.
C. During construction, coordinate use of site and facilities through the Project Coordinator.
D. Comply with Project Coordinator's procedures for intra-project communications; submittals, reports
and records, schedules, coordination drawings, and recommendations; and resolution of
ambiguities and conflicts.
E. Comply with instructions of the Project Coordinator for use of temporary utilities and construction
facilities.
F. Coordinate field engineering and layout work under instructions of the Project Coordinator.
G. Make the following types of submittals to Architect through the Project Coordinator:
1. Requests for interpretation.
2. Requests for substitution.
3. Shop drawings, product data, and samples.
4. Test and inspection reports.
5. Design data.
6. Manufacturer's instructions and field reports.
7. Applications for payment and change order requests.
8. Progress schedules.
9. Coordination drawings.
10. Closeout submittals.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 PRECONSTRUCTION MEETING
A. Architect will schedule a meeting after Notice of Award.
25170 Brule Public Works Garage 01 30 00 - 2 ADMINISTRATIVE REQUIREMENTS
B. Attendance Required:
1. Owner.
2. Architect.
3. Contractor.
C. Agenda:
1. Execution of Owner- Contractor Agreement.
2. Submission of executed bonds and insurance certificates.
3. Distribution of Contract Documents.
4. Submission of list of Subcontractors, list of Products, schedule of values, and progress
schedule.
5. Designation of personnel representing the parties to Contract and Architect.
6. Designation of personnel representing the parties to Contract, General Contractor, Major
Subcontractors, Owner and Architect.
7. Procedures and processing of field decisions, submittals, substitutions, applications for
payments, proposal request, Change Orders, and Contract closeout procedures.
8. Rules and regulations governing performance of Work.
9. Procedures for safety and first aid, security, quality control housekeeping, and other related
matters.
10. Scheduling.
11. Any additional Owner or Architect/Engineer requirements.
D. Record minutes and distribute electronic copies within two days after meeting to participants, with
electronic copies to Architect, Owner, participants, and those affected by decisions made.
3.02 PROGRESS MEETINGS
A. Schedule and administer meetings throughout progress of the Work at maximum monthly
intervals.
B. Contractor will make arrangements for meetings, prepare agenda with copies for participants,
preside at meetings.
C. Attendance Required: Job superintendent, major Subcontractors and suppliers, Owner, Architect,
as appropriate to agenda topics for each meeting.
D. Agenda:
1. Review minutes of previous meetings.
2. Review of Work progress.
3. Field observations, problems, and decisions.
4. Identification of problems that impede, or will impede, planned progress.
5. Review of submittals schedule and status of submittals.
6. Review of off-site fabrication and delivery schedules.
7. Maintenance of progress schedule.
8. Corrective measures to regain projected schedules.
9. Planned progress during succeeding work period.
10. Maintenance of quality and work standards.
11. Effect of proposed changes on progress schedule and coordination.
12. Other business relating to Work.
E. Record minutes and distribute electronic copies within two days after meeting to participants, with
electronic copies to Architect, Owner, participants, and those affected by decisions made.
3.03 PRE-INSTALLATION CONFERENCES
A. When required in individual specification section, the Architect shall convene a pre-installation
conference at work site prior to commencing work of the Section. When possible this shall be
scheduled to coincide with a regular progress meeting.
B. Attendance will be required by all parties directly affecting, or affected by, work of the specific
Section.
25170 Brule Public Works Garage 01 30 00 - 3 ADMINISTRATIVE REQUIREMENTS
C. Notify all parties seven days in advance of meeting date.
D. The Architect shall, preside at conference, record minutes, and distribute copies to all participants.
E. Review conditions of installation, preparation and installation procedures, and coordination with
related work.
3.04 CONSTRUCTION PROGRESS SCHEDULE
A. Within 10 days after date of the Agreement, submit preliminary schedule defining planned
operations for the first 60 days of Work, with a general outline for remainder of Work.
B. If preliminary schedule requires revision after review, submit revised schedule within 10 days.
C. Within 20 days after review of preliminary schedule, submit draft of proposed complete schedule
for review.
1. Include written certification that major contractors have reviewed and accepted proposed
schedule.
D. Within 10 days after joint review, submit complete schedule.
E. Submit updated schedule with each Application for Payment.
3.05 SUBMITTALS FOR REVIEW
A. When the following are specified in individual sections, submit them for review:
1. Product data.
2. Shop drawings.
3. Samples for selection.
4. Samples for verification.
B. Submit to Architect for review for the limited purpose of checking for conformance with information
given and the design concept expressed in the contract documents.
C. Samples will be reviewed only for aesthetic, color, or finish selection.
D. Allow for at least two weeks review of submittals to avoid delay of work.
E. Include with submittal preparation, field construction criteria, verification of catalog numbers and
similar data, and coordination of Work requirements and Contract Documents.
F. Make all submittals to the Architect through the project coordination administrator unless specified
otherwise.
G. After review, provide copies and distribute in accordance with SUBMITTAL PROCEDURES article
below and for record documents purposes described in Section 01 78 00 - CLOSEOUT
SUBMITTALS.
3.06 SUBMITTALS FOR INFORMATION
A. When the following are specified in individual sections, submit them for information:
1. Design data.
2. Certificates.
3. Test reports.
4. Inspection reports.
5. Manufacturer's instructions.
6. Manufacturer's field reports.
7. Other types indicated.
B. No shop drawings of equipment brochures, cuts of fixtures, etc. Such copies of standard
manufactured items in the form of manufacturer's catalog sheets showing sizes, dimensions,
performance characteristics, capacities, clearances, wiring diagrams, and shall be furnished in
electronically unless otherwise specified. Electronic copies will be stamped, and electronic copies
will be returned to the Project Coordination Administrator for distribution to the subcontractor or
supplier. If notations and marks indicate that revised information is required before shop
fabrications (or other work represented) can proceed, revised or corrected information shall be
submitted.
25170 Brule Public Works Garage 01 30 00 - 4 ADMINISTRATIVE REQUIREMENTS
C. Unless otherwise specified, submit to the Architect two representative samples of size and nature
representing typical qualities. Where required, submit a sufficient number of samples to
demonstrate the complete range of variations of the material or quality. Written acceptance of the
Architect is required prior to ordering any item for which samples are required.
D. Submit samples to Architect securely packaged, with the name of the Project clearly indicated on
the package exterior. Firmly attach a label or tag to the sample, with the following information: a)
Name of Project; b) Name of Supplier; 3) Name of Trade Contractor, and, d) Product information
such as manufacturer's designation, finish, type, class, grade, etc., as is appropriate.
E. Erect field samples and mock-ups at the project site, unless otherwise specified in the Contract
Documents, at a location acceptable to the Project Coordination Administrator, Architect and
Owner.
F. Review of shop drawings, product data and samples by the Architect or his consultant does not
relieve the Contractor, Subcontractor or Supplier of responsibility for compliance with the Contract
Documents, confirming and correlating quantities and dimensions, selecting fabrication processes
and techniques of construction, coordination of the work represented by each submittal with other
trades, performing the work in a safe and satisfactory manner, compliance with the Project
Schedule and all other provisions of the agreements.
G. The Architect's/Engineer's notation on the submittals is not an authorization for additional work or
additional cost. If any notations represent a change to the Contract Sum, submit a cost proposal to
the Architect, through the Project Coordination Administrator for the change in accordance with the
procedures specified before proceeding with the work. Notify the Project Coordination
Administrator by letter within five days of returned submittal. Resolve such issues before
proceeding with the work.
H. The Contractor, Subcontractor or supplier shall not begin fabrication until all specified submittal
procedures have been fulfilled.
I. In order to guarantee the delivery of materials for timely completion of the work, and to relieve the
Contractor of direct responsibility in the event of materials shortages or transportation delays, the
Supplier shall, within two (2) weeks after the receipt of Notice to Proceed, furnish to the Architect,
confirmed orders showing the anticipated date of delivery to the site, for materials for all of the
principle parts of the work and for such others as the Architect/Engineer or Owner may direct.
J. In addition to Warranty provisions of the General Conditions, provide all extended warranties,
bonds and service contracts as required by individual specification sections.
K. Assemble and submit to the Architect warranties, bonds, and service and maintenance contracts
as specified in the respective section of the Specifications. In conjunction with the submittals of
Section 01 78 00, the table of contents for this submittal shall include the product of work item, the
form, with the name of the principal, address and telephone number, scope, date of beginning of
the warranty, bond or service maintenance contract, duration, information for the Owner's
personnel providing the proper procedure in case of a failure and instances which might affect the
validity of the warranty or bond.
L. The beginning date of the warranty will be the date that the project is substantially completed.
M. Reports of inspections, tests and approvals required by the Contract Documents shall be
submitted to the Architect, through the Project Coordination Administrator, in the quantities
indicated.
N. Submit for Architect's knowledge as contract administrator or for Owner. No action will be taken.
3.07 SUBMITTALS FOR PROJECT CLOSEOUT
A. When the following are specified in individual sections, submit them at project closeout:
1. Project record documents.
2. Operation and maintenance data.
25170 Brule Public Works Garage 01 30 00 - 5 ADMINISTRATIVE REQUIREMENTS
3. Warranties.
4. Bonds.
5. Other types as indicated.
B. Submit for Owner's benefit during and after project completion.
3.08 SUBMITTALS
A. Documents for Review:
1. Transmit electronic copies of each shop drawing to Project Coordination Administrator.
a. The Project Coordination Administrator shall generally review shop drawings for
compliance with the Drawings and Specification.
b. Electronic copies of shop drawings individually stamped by Project Coordination
Administrator will be sent to Architect for review.
2. Architect or their consultant will review all shop drawings and will return electronic copies to
the Project Coordination Administrator stamped to indicate action taken.
a. The electronic copies of any shop drawings that are not satisfactory to the Architect or
his consultant will be returned to the Project Coordination Administrator for necessary
revision and resubmittal.
b. Electronic copies of shop drawings that do not require major revisions, will have
corrections, if any, noted, and will be stamped to indicate Architect's action.
B. Documents for Information: Submit electronic copies.
C. Documents for Project Closeout: Make one reproduction of submittal originally reviewed. Submit
one extra of submittals for information.
D. Samples: Submit the number specified in individual specification sections; one of which will be
retained by Architect.
1. After review, produce duplicates.
2. Retained samples will not be returned to Contractor unless specifically so stated.
3.09 SUBMITTAL PROCEDURES
A. Transmit each submittal with letter of transmittal.
B. Sequentially number the transmittal form. Revise submittals with original number and a sequential
alphabetic suffix.
C. Identify Project, Contractor, Subcontractor or supplier; pertinent drawing and detail number, and
specification section number, as appropriate on each copy.
D. Apply Contractor's stamp, signed or initialed certifying that review, approval, verification of
Products required, field dimensions, adjacent construction Work, and coordination of information is
in accordance with the requirements of the Work and Contract Documents.
E. Deliver submittals to Architect at business address.
F. Schedule submittals to expedite the Project, and coordinate submission of related items.
G. For each submittal for review, allow 15 days excluding delivery time to and from the Contractor.
H. Identify variations from Contract Documents and Product or system limitations that may be
detrimental to successful performance of the completed Work.
I. Provide space for Contractor and Architect review stamps.
J. When revised for resubmission, identify all changes made since previous submission.
K. Distribute reviewed submittals as appropriate. Instruct parties to promptly report any inability to
comply with requirements.
L. Submittals not requested will not be recognized or processed.
END OF SECTION
25170 Brule Public Works Garage 01 40 00 - 1 QUALITY REQUIREMENTS
SECTION 01 40 00
QUALITY REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. References and standards.
B. Control of installation.
C. Tolerances.
D. Testing and inspection services.
E. Manufacturers' field services.
1.02 REFERENCE STANDARDS
A. ASTM C1021 - Standard Practice for Laboratories Engaged in Testing of Building Sealants;
2008.
B. ASTM C1077 - Standard Practice for Laboratories Testing Concrete and Concrete Aggregates
for Use in Construction and Criteria for Laboratory Evaluation.
C. ASTM C1093 - Standard Practice for Accreditation of Testing Agencies for Masonry.
D. ASTM D3740 - Standard Practice for Minimum Requirements for Agencies Engaged in the
Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction.
E. ASTM E329 - Standard Specification for Agencies Engaged Construction Inspection and/or
Testing.
F. ASTM E543 - Standard Specification for Agencies Performing Nondestructive Testing.
1.03 SUBMITTALS
A. Test Reports: After each test/inspection, promptly submit electronic copies of report to Architect
and to Contractor.
1. Include:
a. Date issued.
b. Project title and number.
c. Name of inspector.
d. Date and time of sampling or inspection.
e. Identification of product and specifications section.
f. Location in the Project.
g. Type of test/inspection.
h. Date of test/inspection.
i. Results of test/inspection.
j. Conformance with Contract Documents.
k. When requested by Architect, provide interpretation of results.
2. Test report submittals are for Architect's knowledge as contract administrator for the
limited purpose of assessing conformance with information given and the design concept
expressed in the contract documents, or for Owner's information.
B. Certificates: When specified in individual specification sections, submit certification by the
manufacturer and Contractor or installation/application subcontractor to Architect, in quantities
specified for Product Data.
1. Indicate material or product conforms to or exceeds specified requirements. Submit
supporting reference data, affidavits, and certifications as appropriate.
2. Certificates may be recent or previous test results on material or product, but must be
acceptable to Architect.
25170 Brule Public Works Garage 01 40 00 - 2 QUALITY REQUIREMENTS
C. Manufacturer's Instructions: When specified in individual specification sections, submit printed
instructions for delivery, storage, assembly, installation, start-up, adjusting, and finishing, for the
Owner's information. Indicate special procedures, perimeter conditions requiring special
attention, and special environmental criteria required for application or installation.
D. Manufacturer's Field Reports: Submit reports for Architect's benefit as contract administrator or
for Owner.
1. Submit report in duplicate within 30 days of observation to Architect for information.
2. Submit for information for the limited purpose of assessing conformance with information
given and the design concept expressed in the contract documents.
E. Erection Drawings: Submit drawings for Architect's benefit as contract administrator or for
Owner.
1. Submit for information for the limited purpose of assessing conformance with information
given and the design concept expressed in the contract documents.
2. Data indicating inappropriate or unacceptable Work may be subject to action by Architect
or Owner.
1.04 REFERENCES AND STANDARDS
A. For products and workmanship specified by reference to a document or documents not
included in the Project Manual, also referred to as reference standards, comply with
requirements of the standard, except when more rigid requirements are specified or are
required by applicable codes.
B. Conform to reference standard of date of issue current on date of Contract Documents, except
where a specific date is established by applicable code.
C. Obtain copies of standards where required by product specification sections.
D. Maintain copy at project site during submittals, planning, and progress of the specific work, until
Substantial Completion.
E. Should specified reference standards conflict with Contract Documents, request clarification
from Architect before proceeding.
F. Neither the contractual relationships, duties, or responsibilities of the parties in Contract nor
those of Architect shall be altered from the Contract Documents by mention or inference
otherwise in any reference document.
1.05 TESTING AND INSPECTION AGENCIES
A. Owner will employ and pay for services of an independent testing agency to perform specified
testing.
B. Employment of agency in no way relieves Contractor of obligation to perform Work in
accordance with requirements of Contract Documents.
PART 2 PRODUCTS NOT USED
PART 3 EXECUTION
3.01 CONTROL OF INSTALLATION
A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and
workmanship, to produce Work of specified quality.
B. Comply with manufacturers' instructions, including each step in sequence.
C. Should manufacturers' instructions conflict with Contract Documents, request clarification from
Architect before proceeding.
D. Comply with specified standards as minimum quality for the Work except where more stringent
tolerances, codes, or specified requirements indicate higher standards or more precise
workmanship.
E. Have Work performed by persons qualified to produce required and specified quality.
25170 Brule Public Works Garage 01 40 00 - 3 QUALITY REQUIREMENTS
F. Verify that field measurements are as indicated on shop drawings or as instructed by the
manufacturer.
G. Secure products in place with positive anchorage devices designed and sized to withstand
stresses, vibration, physical distortion, and disfigurement.
3.02 TOLERANCES
A. Monitor fabrication and installation tolerance control of products to produce acceptable Work.
Do not permit tolerances to accumulate.
B. Comply with manufacturers' tolerances. Should manufacturers' tolerances conflict with Contract
Documents, request clarification from Architect before proceeding.
C. Adjust products to appropriate dimensions; position before securing products in place.
3.03 TESTING AND INSPECTION
A. Testing Agency Duties:
1. Provide qualified personnel at site. Cooperate with Architect and Contractor in
performance of services.
2. Perform specified sampling and testing of products in accordance with specified
standards.
3. Ascertain compliance of materials and mixes with requirements of Contract Documents.
4. Promptly notify Architect and Contractor of observed irregularities or non-conformance of
Work or products.
5. Perform additional tests and inspections required by Architect.
6. Submit reports of all tests/inspections specified.
B. Limits on Testing/Inspection Agency Authority:
1. Agency may not release, revoke, alter, or enlarge on requirements of Contract
Documents.
2. Agency may not approve or accept any portion of the Work.
3. Agency may not assume any duties of Contractor.
4. Agency has no authority to stop the Work.
C. Contractor Responsibilities:
1. Deliver to agency at designated location, adequate samples of materials proposed to be
used that require testing, along with proposed mix designs.
2. Cooperate with laboratory personnel, and provide access to the Work and to
manufacturers' facilities.
3. Provide incidental labor and facilities:
a. To provide access to Work to be tested/inspected.
b. To obtain and handle samples at the site or at source of Products to be
tested/inspected.
c. To facilitate tests/inspections.
d. To provide storage and curing of test samples.
4. Notify Architect and laboratory 24 hours prior to expected time for operations requiring
testing/inspection services.
5. Employ services of an independent qualified testing laboratory and pay for additional
samples, tests, and inspections required by Contractor beyond specified requirements.
6. Arrange with Owner's agency and pay for additional samples, tests, and inspections
required by Contractor beyond specified requirements.
D. Re-testing required because of non-conformance to specified requirements shall be performed
by the same agency on instructions by Architect.
E. Re-testing required because of non-conformance to specified requirements shall be paid for by
Contractor.
25170 Brule Public Works Garage 01 40 00 - 4 QUALITY REQUIREMENTS
3.04 MANUFACTURERS' FIELD SERVICES
A. When specified in individual specification sections, require material or product suppliers or
manufacturers to provide qualified staff personnel to observe site conditions, conditions of
surfaces and installation, quality of workmanship, start-up of equipment, test, adjust and
balance of equipment as applicable, and to initiate instructions when necessary.
B. Report observations and site decisions or instructions given to applicators or installers that are
supplemental or contrary to manufacturers' written instructions.
3.05 DEFECT ASSESSMENT
A. Replace Work or portions of the Work not conforming to specified requirements.
B. If, in the opinion of Architect, it is not practical to remove and replace the Work, Architect will
direct an appropriate remedy or adjust payment.
END OF SECTION
25170 Brule Public Works Garage 01 50 00 - 1 TEMPORARY FACILITIES AND
CONTROLS
SECTION 01 50 00
TEMPORARY FACILITIES AND CONTROLS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Temporary utilities.
B. Temporary telecommunications services.
C. Temporary sanitary facilities.
D. Temporary Controls: Barriers, enclosures, and fencing.
E. Security requirements.
F. Vehicular access and parking.
G. Waste removal facilities and services.
H. Field offices.
1.02 TEMPORARY UTILITIES
A. Owner will provide the following:
1. Electrical power and metering, consisting of connection to existing facilities.
2. Water supply, consisting of connection to existing facilities.
B. Temporary Light and Power:
1. Prime Contractor Responsibilities:
a. The Prime Contractor shall coordinate temporary light and power during construction
phases of the project.
b. The Prime Contractor shall pay for all electrical energy used.
c. Coordinate with the sitework contractor.
2. Electrical Sub-Contractor responsibilities:
a. Provide temporary ties into an existing panel/panels within the general proximity of
the remodeling and new construction.
b. Provide at least one 20 amp., 120 volt, temporary branch circuit with three grounding,
duplex receptacles for each 7500 sq. ft. of floor area. Locate receptacles so that
extension cords will not exceed 100 feet in length. The temporary branch circuits may
be used for portable tools, portable lights and other small power loads.
c. Provide at least one 200 watt incandescent lamp, or the equivalent lighting for each
625 sq. ft. of floor area with at least one light in each room. Provide additional lights in
corridors and stairwells as necessary to provide adequate illumination. Furnish all
light bulbs for the temporary lighting system.
d. Maintain the temporary electrical service and lighting during the normal work week
which is defined as five days a week, including one-half hour before regular working
hours and one-half after regular working hours for each trade. (10 hours per day)
e. Remove the temporary light and power system and the temporary service terminals
when no longer required, and repair any damage caused by the temporary system.
3. Separate Contractor/Subcontractor responsibilities:
a. If 3-phase power or voltage higher than 120 volts is required, provide the necessary
temporary wiring, and pay the cost thereof. Coordinate installation with Electrical
Contractor.
b. Do not use the temporary light and power system for electric welders, hoists, or
heating.
c. Maintain temporary electrical service and lighting if used beyond the normal work
week.
d. Each subcontractor shall make arrangements and pay the costs for electrical service,
lighting and power for his field office, storage sheds, and other temporary buildings.
e. Each Sub-Contractor shall furnish extension cords and contractors requiring
supplemental lights shall furnish their own portable lights.
25170 Brule Public Works Garage 01 50 00 - 2 TEMPORARY FACILITIES AND
CONTROLS
4. Use of permanent electrical system: when installation of the permanent electric system is
sufficiently complete to be operated safely and system may be used to provide
construction light and power, and testing and operating of permanent equipment.
5. Permanent light and power: The Owner will assume the responsibility and pay the costs of
providing electrical light and power including the energy cost on the date of his occupancy
or the date of Substantial Completion of the Project, whichever is sooner.
C. Water:
1. Water is available at the site for use by the Contractor. Contractors shall make every effort
to conserve the use of water.
2. Water consumption cost will be paid by the Owner.
3. Contractors/Subcontractors are responsible for providing their own hoses to bring water
from the temporary water source to their work areas. Only heavy duty 3/4" hose in good
condition will be permitted. The discharge end of each hose will be equipped with a means
of positive shut-off. Do not use hoses which leak at connections or elsewhere throughout
their length. Disconnect all hoses from hose bibs when not in use and before the end of
the work day.
4. Each Contractor/Subcontractor shall provide remote sanitary drinking water dispensers for
use of their own personnel, convenient of work stations.
5. Those using the water shall protect or remove water supply during freezing temperatures.
1.03 CONSTRUCTION HEAT PRIOR TO ENCLOSURE
A. Adhere to the approved Project Schedule, regardless of weather conditions, during the period
when work is scheduled to be performed. All required work and the cost thereof to meet this
obligation will be included in the Contractor's base proposal and in the resulting Contract Sum.
No claim for an extension of Contract Time, or for an increase in Contract Sum will be honored
by the Owner, if such claim is based upon the cost of providing construction heat as specified
above.
B. Each Contractor or Subcontractor to be responsible for providing temporary weather-tight
enclosures as approved by the Owner and Architect, as work progresses, and as necessary to
provide acceptable working conditions to accomplish their work without causing a delay in the
project.
1.04 CONSTRUCTION HEAT AFTER ENCLOSURE
A. For construction heat purposes, the building or portion thereof will be declared enclosed when
all enclosing walls are erected, roof or floor construction above is installed, and all doors,
windows, or openings in the exterior walls are covered.
B. After enclosure, if required, the General Contractor shall provide, operate, and maintain a
temporary system for heating the enclosed area of the building. This system shall consist of
direct fired L.P. gas, temporary heat units or other devices as required to maintain the specified
temperatures.
C. After enclosure of the building, a minimum temperature of 50 degrees F. shall be maintained at
all times. During the placing of interior millwork, resilient flooring, acoustic tile, ceramic tile,
plaster, painting and decorating, and similar finish materials, and continuing until the Owner
assumes responsibility for heating the building, the minimum temperature shall be 60 degrees
F. It shall be the responsibility of each Contractor to coordinate with the General Contractor to
assure that all temporary enclosures remain in the closed position.
D. The General Contractor shall arrange for the ventilation of enclosed areas to assist cure of
materials, to dissipate humidity, and to prevent accumulation of dust, fumes, vapors, and
gases.
E. This temporary heating and ventilation shall remain in place until the permanent heating and
ventilation systems are installed, including ductwork.
25170 Brule Public Works Garage 01 50 00 - 3 TEMPORARY FACILITIES AND
CONTROLS
1.05 USE OF PERMANENT HEATING AND VENTILATING SYSTEMS:
A. If required, the General Contractor and the Heating Contractor shall operate and maintain the
equipment during its use for temporary heating.
B. The cost of fuel and utilities used in the operation of the permanent heating system will be paid
for by General Contractor.
C. Warranties shall begin upon Substantial Completion.
D. The permanent system shall be operated, after final review and acceptance, with a full
complement of disposable filters which shall be replaced by the Mechanical Contractor upon
completion of the project.
1.06 VENTILATION
A. The General Contractor shall arrange for the ventilation of enclosed areas to assist cure of
materials, to dissipate humidity, and to prevent accumulation of dust, fumes, vapors, and
gases.
1.07 TELECOMMUNICATIONS SERVICES
A. Each contractor shall be responsible for installation, payment of charges, and removal of any
telephone they may require in their office or storage trailer.
B. Use of cellular phones will be permitted.
1.08 TEMPORARY SANITARY FACILITIES
A. Provide and maintain required facilities and enclosures. Provide at time of project mobilization.
B. Maintain daily in clean and sanitary condition.
C. The Prime Contractor shall provide & maintain one or more portable Satellite type temporary
toilets convenient to each major area of construction, for the use of all Contractors,
subcontractors, their personnel and employees.
1.09 BARRIERS
A. Provide barriers to prevent unauthorized entry to construction areas, to prevent access to areas
that could be hazardous to workers or the public, to allow for owner's use of site and to protect
existing facilities and adjacent properties from damage from construction operations and
demolition.
B. Each Contractor shall furnish and maintain all necessary informational signs required to help
maintain the safety and health at the work site such as "Danger" "High Voltage", etc.
C. Provide barricades and covered walkways required by governing authorities for public
rights-of-way and for public access to existing building.
D. Protect non-owned vehicular traffic, stored materials, site, and structures from damage.
1.10 EXTERIOR ENCLOSURES
A. Provide temporary weather tight closure of exterior openings to accommodate acceptable
working conditions and protection for Products, to allow for temporary heating and maintenance
of required ambient temperatures identified in individual specification sections, and to prevent
entry of unauthorized persons. Provide access doors with self-closing hardware and locks.
1.11 INTERIOR ENCLOSURES
A. Provide temporary partitions and ceilings as indicated to separate work areas from
Owner-occupied areas, to prevent penetration of dust and moisture into Owner-occupied areas,
and to prevent damage to existing materials and equipment.
B. Construction: Framing and reinforced polyethylene sheet materials with closed joints and
sealed edges at intersections with existing surfaces:
25170 Brule Public Works Garage 01 50 00 - 4 TEMPORARY FACILITIES AND
CONTROLS
1.12 CONSTRUCTION ACCESS AND BARRIERS
A. Each Contractor shall provide temporary construction access consisting of OSHA approved
ladders and/or scaffolding required to carry out the work of their contract. These shall be placed
at a location approved by the General Contractor.
B. Each Contractor and Subcontractor shall provide hoisting facilities for his own use.
C. Each Contractor shall provide temporary sheeting and shore and brace excavations and new
construction as necessary for the safe and proper execution of the Work. Remove temporary
supports when backfilling is complete or new construction can safely support the loads.
D. The General Contractor shall provide protective fences, barricades and lights as required to
prevent unauthorized entry to construction areas to meet all safety requirements of OSHA and
to protect existing facilities and adjacent properties from damage from their construction
operations.
1. Any contractor carrying out excavation or requiring excavations shall protect excavations,
trenches, etc. from accidental access by placing protective fencing around openings.
E. Protective fencing at all excavations shall be provided by the Excavator.
F. Protective fencing at storage areas shall be provided by the Contractor who's materials require
fencing.
1.13 SECURITY
A. Provide security and facilities to protect Work, existing facilities, and Owner's operations from
unauthorized entry, vandalism, or theft.
B. The General Contractor shall be responsible for security of the building and site. Exterior
openings at which work cannot be completed within one working day's time will be closed to
prevent entry into existing buildings or new construction.
C. This shall include those temporary closures as required under Construction Heat after
enclosure.
D. Each Contractor will be responsible for the security of his own property.
1.14 VEHICULAR ACCESS AND PARKING
A. Coordinate access and haul routes with governing authorities and Owner.
B. Provide and maintain access to fire hydrants, free of obstructions.
C. Provide means of removing mud from vehicle wheels before entering streets.
D. Provide temporary parking areas to accommodate construction personnel. When site space is
not adequate, provide additional off-site parking.
E. Parking locations will be designated by the General Contractor.
F. Trucks and other vehicles belonging to Contractors, Subcontractors and suppliers may be
parked on the site provided space is available and the vehicles are identified. Such parking
shall be subject to the direction of the General Contractor.
G. Perform cleaning of concrete equipment at location designated by the General Contractor.
Remove from the site all residue accumulated from the cleaning operations of concrete
equipment.
H. Contractors failing to adequately clean vehicles or otherwise causing dirt or debris to be
deposited on any public street or highway shall be responsible for all costs in connection with
the cleaning thereof whether performed by the General Contractor, or at the direction of any
public authority having jurisdiction.
I. Access to the site shall be by roadways, approved by the Owner.
J. Access Roads shall be established and maintained by the Earthwork Contractor, as directed
the General Contractor.
25170 Brule Public Works Garage 01 50 00 - 5 TEMPORARY FACILITIES AND
CONTROLS
1.15 WASTE REMOVAL
A. Provide waste removal facilities and services as required to maintain the site in clean and
orderly condition.
B. Provide containers with lids. Remove trash from site periodically.
C. If materials to be recycled or re-used on the project must be stored on-site, provide suitable
non-combustible containers; locate containers holding flammable material outside the structure
unless otherwise approved by the authorities having jurisdiction.
D. Open free-fall chutes are not permitted. Terminate closed chutes into appropriate containers
with lids.
E. Each contractor/subcontractor shall collect waste from the construction areas & dispose of in
dumpsters as provided by the Prime Contractor.
F. If contractor/subcontractor does not remove this waste on a timely basis, the Owner/Architect
may direct the prime contractor to remove waste and the contractor/subcontractor may be back
charged by the prime contractor for this removal.
G. Separate construction waste & recycle dumpsters may be provided, and if so, all contractors
shall separate all waste materials as directed and place into proper dumpster.
1.16 WATER AND EROSION CONTROL
A. Any Contractor carrying out excavating or requiring excavations shall protect excavations,
trenches, other temporary work, the building, and other work of the Project from damage from
water (including ground water, rain water, backing up of sewers, and drains and ice and snow).
Keep excavations and trenches free from water during the progress of the Work, and provide
temporary enclosures, pumps and equipment and do all grading, pumping, bailing, or other
work necessary to ensure this protection.
B. Plan and execute construction and earth work by methods to control surface drainage from cuts
and fills, and from borrow and waste disposal areas, to prevent erosion and sedimentation.
1. Hold the areas of bare soil exposed at one time to a minimum.
2. Provide temporary control measures such as berms, dikes, drains and silt fences as
necessary.
C. Construct fills and waste areas by selective placement to eliminate surface silts or clays which
will erode.
D. Protect site from puddling or running water. Provide water barriers and slope protection as
required to protect site from erosion.
E. Each Contractor shall provide protection against wind, storms, frost, rain, snow, heat and cold
to avoid injury to material in transit, stored material, and Work in place.
F. Periodically inspect earthwork to detect any evidence of the start of erosion, apply corrective
measures as required to control erosion.
G. Remove all items not required to remain upon completion of the project and approval of the
General Contractor.
H. Clean streets & walks adjacent to the project of dirt, mud or other materials on a weekly basis.
I. Provide silt fences and other runoff control devices as required by agencies having jurisdiction.
1.17 TREE AND PLANT PROTECTION
A. The General Contractor shall arrange for and pay the cost of all tree protection. This shall
generally consist of a project boundary fence, which shall be erected immediately upon the start
of construction of the Project.
B. Each Contractor/Subcontractor shall be responsible for carefully supervising all work to prevent
injury to trees and plants and to replace, or suitably repair, trees and plants which are damaged
or destroyed due to construction operations.
25170 Brule Public Works Garage 01 50 00 - 6 TEMPORARY FACILITIES AND
CONTROLS
1.18 PROTECTION OF INSTALLED WORK
A. Each Contractor shall see to it that protection is provided for work as follows:
1. Protect installed Work and provide special protection where specified in individual
specification Sections.
2. Provide temporary and removable protection for installed Products. Control activity in
immediate work area to minimize damage.
3. Provide protective coverings at walls, projections, jambs, sills, and soffits of openings.
4. Protect finished floors, stairs, and other surfaces from traffic, dirt, wear, damage, or
movement of heavy objects, by protecting with durable sheet materials.
5. Prohibit traffic or storage upon waterproofed or roofed surfaces. If traffic or activity is
necessary, obtain recommendations for protection from waterproofing or roofing material
manufacturer.
B. The Contractor shall arrange for the correction of any damage caused by the operations of
themself or any Subcontractor and shall deduct the cost of corrections from monies due the
Contract.
1.19 FIELD OFFICES
A. Office: Weathertight, with lighting, electrical outlets, heating, cooling equipment, and equipped
with sturdy furniture, drawing rack and drawing display table.
B. Provide space for Project meetings, with table and chairs to accommodate 6 persons.
C. If space is available, contractors may provide a field office for their own use, installed at a
suitable location on the site as designated by the General Contractor. Provide and pay for all
utilities used in conjunction with field office.
D. Locate offices a minimum distance of 30 feet from existing and new structures.
1.20 TEMPORARY STORAGE
A. Contractors may provide storage sheds and/or trailers as their needs may require, and as
space is available, coordinate the location with the General Contractor. All temporary structures
will be removed before final acceptance of the Work.
B. Limit use of the premises for work and for storage. Cooperation with all separate contractors on
the project shall be under the direction of the General Contractor.
1.21 REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS
A. Remove temporary utilities, equipment, facilities, materials, prior to Substantial Completion
inspection.
B. Remove underground installations to a minimum depth of 2 feet. Grade site as indicated.
C. Clean and repair damage caused by installation or use of temporary work.
D. Restore existing facilities used during construction to original condition.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
END OF SECTION
25170 Brule Public Works Garage 01 60 00 - 1 PRODUCT REQUIREMENTS
SECTION 01 60 00
PRODUCT REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Re-use of existing products.
B. Transportation, handling, storage and protection.
C. Product option requirements.
D. Substitution limitations and procedures.
E. Procedures for Owner-supplied products.
F. Maintenance materials, including extra materials, spare parts, tools, and software.
1.02 SUBMITTALS
A. Product Data Submittals: Submit manufacturer's standard published data. Mark each copy to
identify applicable products, models, options, and other data. Supplement manufacturers'
standard data to provide information specific to this Project.
B. Shop Drawing Submittals: Prepared specifically for this Project; indicate utility and electrical
characteristics, utility connection requirements, and location of utility outlets for service for
functional equipment and appliances.
C. Sample Submittals: Illustrate functional and aesthetic characteristics of the product, with
integral parts and attachment devices. Coordinate sample submittals for interfacing work.
1. For selection from standard finishes, submit samples of the full range of the
manufacturer's standard colors, textures, and patterns.
PART 2 PRODUCTS
2.01 EXISTING PRODUCTS
A. Do not use materials and equipment removed from existing premises unless specifically
required or permitted by the Contract Documents.
B. Existing materials and equipment indicated to be removed, but not to be re-used, relocated,
reinstalled, delivered to the Owner, or otherwise indicated as to remain the property of the
Owner, become the property of the Contractor; remove from site.
C. Reused Products: Reused products include materials and equipment previously used in this or
other construction, salvaged and refurbished as specified.
2.02 NEW PRODUCTS
A. Provide new products unless specifically required or permitted by the Contract Documents.
B. Provide interchangeable components of the same manufacture for components being replaced.
2.03 PRODUCT OPTIONS
A. Products Specified by Reference Standards or by Description Only: Use any product meeting
those standards or description.
B. Products Specified by Naming One or More Manufacturers: Use a product of one of the
manufacturers named and meeting specifications, no options or substitutions allowed.
C. Products Specified by Naming One or More Manufacturers with a Provision for Substitutions:
Submit a request for substitution for any manufacturer not named.
2.04 MAINTENANCE MATERIALS
A. Furnish extra materials, spare parts, tools, and software of types and in quantities specified in
individual specification sections.
B. Deliver to Project site; obtain receipt prior to final payment.
25170 Brule Public Works Garage 01 60 00 - 2 PRODUCT REQUIREMENTS
PART 3 EXECUTION
3.01 SUBSTITUTION PROCEDURES
A. Instructions to Bidders specify time restrictions for submitting requests for substitutions during
the bidding period. Comply with requirements specified in this section.
B. Substitutions may be considered when a product becomes unavailable through no fault of the
Contractor.
C. Document each request with complete data substantiating compliance of proposed substitution
with Contract Documents.
D. A request for substitution constitutes a representation that the submitter:
1. Has investigated proposed product and determined that it meets or exceeds the quality
level of the specified product.
2. Will provide the same warranty for the substitution as for the specified product.
3. Will coordinate installation and make changes to other Work that may be required for the
Work to be complete with no additional cost to Owner.
4. Waives claims for additional costs or time extension that may subsequently become
apparent.
E. Substitutions will not be considered when they are indicated or implied on shop drawing or
product data submittals, without separate written request, or when acceptance will require
revision to the Contract Documents.
F. Substitution Submittal Procedure:
1. Submit three copies of request for substitution for consideration. Limit each request to one
proposed substitution.
2. Submit shop drawings, product data, and certified test results attesting to the proposed
product equivalence. Burden of proof is on proposer.
3. The Architect will notify Contractor in writing of decision to accept or reject request.
3.02 OWNER-SUPPLIED PRODUCTS
A. Owner's Responsibilities:
1. Arrange for and deliver Owner reviewed shop drawings, product data, and samples, to
Contractor.
2. Arrange and pay for product delivery to site.
3. On delivery, inspect products jointly with Contractor.
4. Submit claims for transportation damage and replace damaged, defective, or deficient
items.
5. Arrange for manufacturers' warranties, inspections, and service.
B. Contractor's Responsibilities:
1. Review Owner reviewed shop drawings, product data, and samples.
2. Receive and unload products at site; inspect for completeness or damage jointly with
Owner.
3. Handle, store, install and finish products.
4. Repair or replace items damaged after receipt.
3.03 TRANSPORTATION AND HANDLING
A. Coordinate schedule of product delivery to designated prepared areas in order to minimize site
storage time and potential damage to stored materials.
B. Transport and handle products in accordance with manufacturer's instructions.
C. Transport materials in covered trucks to prevent contamination of product and littering of
surrounding areas.
D. Promptly inspect shipments to ensure that products comply with requirements, quantities are
correct, and products are undamaged.
25170 Brule Public Works Garage 01 60 00 - 3 PRODUCT REQUIREMENTS
E. Provide equipment and personnel to handle products by methods to prevent soiling,
disfigurement, or damage.
F. Replace damaged materials at no additional cost to the owner.
G. Deliver items required to be built into masonry or concrete promptly to the site so they may be
built in as the work progresses. Provide templates showing exact locations.
H. Do not deliver materials subject to damage unduly long before they are required in the work
and suitable storage facilities are available at the site.
I. Arrange for the return of packing materials, such as wood pallets, where economically feasible.
3.04 STORAGE AND PROTECTION
A. Designate receiving/storage areas for incoming products so that they are delivered according to
installation schedule and placed convenient to work area in order to minimize waste due to
excessive materials handling and misapplication.
B. Store and protect products in accordance with manufacturers' instructions.
C. Store with seals and labels intact and legible.
D. Store sensitive products in weather tight, climate controlled, enclosures in an environment
favorable to product.
E. For exterior storage of fabricated products, place on sloped supports above ground.
F. Provide bonded off-site storage and protection when site does not permit on-site storage or
protection.
G. Cover products subject to deterioration with impervious sheet covering. Provide ventilation to
prevent condensation and degradation of products.
H. Store loose granular materials on solid flat surfaces in a well-drained area. Prevent mixing with
foreign matter.
I. Prevent contact with material that may cause corrosion, discoloration, or staining.
J. Provide equipment and personnel to store products by methods to prevent soiling,
disfigurement, or damage.
K. Arrange storage of products to permit access for inspection. Periodically inspect to verify
products are undamaged and are maintained in acceptable condition.
L. Arrange storage of products to permit access for inspection. Periodically inspect to ensure
products are undamaged and are maintained under specified conditions.
M. Replace damaged materials at no additional cost to the owner.
END OF SECTION
25170 Brule Public Works Garage 01 70 00 - 1 EXECUTION AND CLOSEOUT
REQUIREMENTS
SECTION 01 70 00
EXECUTION AND CLOSEOUT REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Examination, preparation, and general installation procedures.
B. Requirements for alterations work, including selective demolition, except removal, disposal,
and/or remediation of hazardous materials and toxic substances.
C. Pre-installation meetings.
D. Cutting and patching.
E. Surveying for laying out the work.
F. Cleaning and protection.
G. Starting of systems and equipment.
H. Demonstration and instruction of Owner personnel.
I. Closeout procedures, except payment procedures.
1.02 REFERENCE STANDARDS
A. NFPA 241 - Standard for Safeguarding Construction, Alteration, and Demolition Operations;
2013.
1.03 SUBMITTALS
A. See Section 01 30 00 - Administrative Requirements, for submittal procedures.
B. Survey work: Submit name, address, and telephone number of Surveyor before starting survey
work.
1. On request, submit documentation verifying accuracy of survey work.
2. Submit a copy of site drawing signed by the Land Surveyor, that the elevations and
locations of the work are in conformance with Contract Documents.
3. Submit surveys and survey logs for the project record.
C. Cutting and Patching: Submit written request in advance of cutting or alteration that affects:
1. Structural integrity of any element of Project.
2. Integrity of weather exposed or moisture resistant element.
3. Efficiency, maintenance, or safety of any operational element.
4. Visual qualities of sight exposed elements.
5. Work of Owner or separate Contractor.
D. Project Record Documents: Accurately record actual locations of capped and active utilities.
1.04 QUALIFICATIONS
A. For demolition work, employ a firm specializing in the type of work required.
B. For survey work, employ a land surveyor registered in the State in which the Project is located
and acceptable to Architect. Submit evidence of Surveyor's Errors and Omissions insurance
coverage in the form of an Insurance Certificate.
C. For field engineering, employ a professional engineer of the discipline required for specific
service on Project, licensed in the State in which the Project is located.
1.05 PROJECT CONDITIONS
A. Grade site to drain. Maintain excavations free of water. Provide, operate, and maintain pumping
equipment.
B. Protect site from puddling or running water. Provide water barriers as required to protect site
from soil erosion.
C. Ventilate enclosed areas to assist cure of materials, to dissipate humidity, and to prevent
accumulation of dust, fumes, vapors, or gases.
25170 Brule Public Works Garage 01 70 00 - 2 EXECUTION AND CLOSEOUT
REQUIREMENTS
D. Dust Control: Execute work by methods to minimize raising dust from construction operations.
Provide positive means to prevent air-borne dust from dispersing into atmosphere and over
adjacent property.
E. Erosion and Sediment Control: Plan and execute work by methods to control surface drainage
from cuts and fills, from borrow and waste disposal areas. Prevent erosion and sedimentation.
1. Minimize amount of bare soil exposed at one time.
2. Provide temporary measures such as berms, dikes, and drains, to prevent water flow.
3. Construct fill and waste areas by selective placement to avoid erosive surface silts or
clays.
4. Periodically inspect earthwork to detect evidence of erosion and sedimentation; promptly
apply corrective measures.
F. Noise Control: Provide methods, means, and facilities to minimize noise produced by
construction operations.
G. Pest and Rodent Control: Provide methods, means, and facilities to prevent pests and insects
from damaging the work.
H. Rodent Control: Provide methods, means, and facilities to prevent rodents from accessing or
invading premises.
I. Pollution Control: Provide methods, means, and facilities to prevent contamination of soil,
water, and atmosphere from discharge of noxious, toxic substances, and pollutants produced
by construction operations. Comply with federal, state, and local regulations.
1.06 COORDINATION
A. This PROJECT COORDINATION ADMINISTRATOR shall coordinate the work of this project,
including the work of his subcontractors.
B. This PROJECT COORDINATION ADMINISTRATOR shall coordinate all work of the project
with the Owner, the Architect and other contractors carrying out work at the site.
C. Each Sub-Contractor and Material Supplier shall coordinate the work of his and that of related
contractors, subcontractors and material suppliers with the aid of the Project Coordination
Administrator.
D. Coordinate scheduling, submittals, and work of the various sections of the Project Manual to
ensure efficient and orderly sequence of installation of interdependent construction elements,
with provisions for accommodating items installed later.
E. Notify affected utility companies and comply with their requirements.
F. Verify that utility requirements and characteristics of new operating equipment are compatible
with building utilities. Coordinate work of various sections having interdependent responsibilities
for installing, connecting to, and placing in service, such equipment.
G. Coordinate space requirements, supports, and installation of mechanical and electrical work
that are indicated diagrammatically on Drawings. Follow routing shown for pipes, ducts, and
conduit, as closely as practicable; place runs parallel with lines of building. Utilize spaces
efficiently to maximize accessibility for other installations, for maintenance, and for repairs.
H. In finished areas except as otherwise indicated, conceal pipes, ducts, and wiring within the
construction. Coordinate locations of fixtures and outlets with finish elements.
I. Coordinate completion and clean-up of work of separate sections.
J. After Owner occupancy of premises, coordinate access to site for correction of defective work
and work not in accordance with Contract Documents, to minimize disruption of Owner's
activities.
PART 2 PRODUCTS
2.01 PATCHING MATERIALS
A. New Materials: As specified in product sections; match existing products and work for patching
and extending work.
25170 Brule Public Works Garage 01 70 00 - 3 EXECUTION AND CLOSEOUT
REQUIREMENTS
B. Type and Quality of Existing Products: Determine by inspecting and testing products where
necessary, referring to existing work as a standard.
C. Product Substitution: For any proposed change in materials, submit request for substitution
described in Section 01 60 00.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that existing site conditions and substrate surfaces are acceptable for subsequent work.
Start of work means acceptance of existing conditions.
B. Verify that existing substrate is capable of structural support or attachment of new work being
applied or attached.
C. Examine and verify specific conditions described in individual specification sections.
D. Take field measurements before confirming product orders or beginning fabrication, to minimize
waste due to over-ordering or misfabrication.
E. Verify that utility services are available, of the correct characteristics, and in the correct
locations.
F. Prior to Cutting: Examine existing conditions prior to commencing work, including elements
subject to damage or movement during cutting and patching. After uncovering existing work,
assess conditions affecting performance of work. Beginning of cutting or patching means
acceptance of existing conditions.
3.02 PREPARATION
A. Clean substrate surfaces prior to applying next material or substance.
B. Seal cracks or openings of substrate prior to applying next material or substance.
C. Apply manufacturer required or recommended substrate primer, sealer, or conditioner prior to
applying any new material or substance in contact or bond.
3.03 PREINSTALLATION MEETINGS
A. When required in individual specification sections, convene a preinstallation meeting at the site
prior to commencing work of the section.
B. Require attendance of parties directly affecting, or affected by, work of the specific section.
C. Notify Architect four days in advance of meeting date.
D. Prepare agenda and preside at meeting:
1. Review conditions of examination, preparation and installation procedures.
2. Review coordination with related work.
E. Record minutes and distribute electronic copies within two days after meeting to participants,
with electronic copies to Architect, Owner, participants, and those affected by decisions made.
3.04 LAYING OUT THE WORK
A. Verify locations of survey control points prior to starting work.
B. Promptly notify Architect of any discrepancies discovered.
C. Protect survey control points prior to starting site work; preserve permanent reference points
during construction.
D. Promptly report to Architect the loss or destruction of any reference point or relocation required
because of changes in grades or other reasons.
E. Replace dislocated survey control points based on original survey control. Make no changes
without prior written notice to Architect.
F. Utilize recognized engineering survey practices.
25170 Brule Public Works Garage 01 70 00 - 4 EXECUTION AND CLOSEOUT
REQUIREMENTS
G. Establish elevations, lines and levels. Locate and lay out by instrumentation and similar
appropriate means:
1. Site improvements including pavements; stakes for grading, fill and topsoil placement;
utility locations, slopes, and invert elevations.
2. Grid or axis for structures.
3. Building foundation, column locations, ground floor elevations.
H. Periodically verify layouts by same means.
I. Maintain a complete and accurate log of control and survey work as it progresses.
3.05 GENERAL INSTALLATION REQUIREMENTS
A. Install products as specified in individual sections, in accordance with manufacturer's
instructions and recommendations, and so as to avoid waste due to necessity for replacement.
B. Make vertical elements plumb and horizontal elements level, unless otherwise indicated.
C. Install equipment and fittings plumb and level, neatly aligned with adjacent vertical and
horizontal lines, unless otherwise indicated.
D. Make consistent texture on surfaces, with seamless transitions, unless otherwise indicated.
E. Make neat transitions between different surfaces, maintaining texture and appearance.
3.06 ALTERATIONS
A. Drawings showing existing construction and utilities are based on casual field observation and
existing record documents only.
1. Verify that construction and utility arrangements are as shown.
2. Report discrepancies to Architect before disturbing existing installation.
3. Beginning of alterations work constitutes acceptance of existing conditions.
B. Maintain weatherproof exterior building enclosure except for interruptions required for
replacement or modifications; take care to prevent water and humidity damage.
1. Where openings in exterior enclosure exist, provide construction to make exterior
enclosure weatherproof.
2. Insulate existing ducts or pipes that are exposed to outdoor ambient temperatures by
alterations work.
C. Remove existing work as indicated and as required to accomplish new work.
1. Remove items indicated on drawings.
2. Relocate items indicated on drawings.
3. Where new surface finishes are to be applied to existing work, perform removals, patch,
and prepare existing surfaces as required to receive new finish; remove existing finish if
necessary for successful application of new finish.
4. Where new surface finishes are not specified or indicated, patch holes and damaged
surfaces to match adjacent finished surfaces as closely as possible.
D. Services (Including but not limited to HVAC, Plumbing, Fire Protection, Electrical, and
Telecommunications): Remove, relocate, and extend existing systems to accommodate new
construction.
1. Maintain existing active systems that are to remain in operation; maintain access to
equipment and operational components; if necessary, modify installation to allow access
or provide access panel.
2. Where existing systems or equipment are not active and Contract Documents require
reactivation, put back into operational condition; repair supply, distribution, and equipment
as required.
3. Where existing active systems serve occupied facilities but are to be replaced with new
services, maintain existing systems in service until new systems are complete and ready
for service.
a. Disable existing systems only to make switchovers and connections; minimize
duration of outages.
25170 Brule Public Works Garage 01 70 00 - 5 EXECUTION AND CLOSEOUT
REQUIREMENTS
b. Provide temporary connections as required to maintain existing systems in service.
4. Verify that abandoned services serve only abandoned facilities.
5. Remove abandoned pipe, ducts, conduits, and equipment, including those above
accessible ceilings; remove back to source of supply where possible, otherwise cap stub
and tag with identification; patch holes left by removal using materials specified for new
construction.
E. Protect existing work to remain.
1. Prevent movement of structure; provide shoring and bracing if necessary.
2. Perform cutting to accomplish removals neatly and as specified for cutting new work.
3. Repair adjacent construction and finishes damaged during removal work.
F. Adapt existing work to fit new work: Make as neat and smooth transition as possible.
1. When existing finished surfaces are cut so that a smooth transition with new work is not
possible, terminate existing surface along a straight line at a natural line of division and
make recommendation to Architect.
2. Where removal of partitions or walls results in adjacent spaces becoming one, rework
floors, walls, and ceilings to a smooth plane without breaks, steps, or bulkheads.
3. Where a change of plane of 1/4 inch or more occurs in existing work, submit
recommendation for providing a smooth transition for Architect review and request
instructions.
4. Trim existing wood doors as necessary to clear new floor finish. Refinish trim as required.
G. Patching: Where the existing surface is not indicated to be refinished, patch to match the
surface finish that existed prior to cutting. Where the surface is indicated to be refinished, patch
so that the substrate is ready for the new finish.
H. Refinish existing surfaces as indicated:
1. Where rooms or spaces are indicated to be refinished, refinish all visible existing surfaces
to remain to the specified condition for each material, with a neat transition to adjacent
finishes.
2. If mechanical or electrical work is exposed accidentally during the work, re-cover and
refinish to match.
I. Clean existing systems and equipment.
J. Remove demolition debris and abandoned items from alterations areas and dispose of off-site;
do not burn or bury.
K. Do not begin new construction in alterations areas before demolition is complete.
L. Comply with all other applicable requirements of this section.
3.07 CUTTING AND PATCHING
A. Whenever possible, execute the work by methods that avoid cutting or patching.
B. See Alterations article above for additional requirements.
C. Perform whatever cutting and patching is necessary to:
1. Complete the work.
2. Fit products together to integrate with other work.
3. Provide openings for penetration of mechanical, electrical, and other services.
4. Match work that has been cut to adjacent work.
5. Repair areas adjacent to cuts to required condition.
6. Repair new work damaged by subsequent work.
7. Remove samples of installed work for testing when requested.
8. Remove and replace defective and non-conforming work.
D. Execute work by methods that avoid damage to other work and that will provide appropriate
surfaces to receive patching and finishing. In existing work, minimize damage and restore to
original condition.
25170 Brule Public Works Garage 01 70 00 - 6 EXECUTION AND CLOSEOUT
REQUIREMENTS
E. Employ original installer to perform cutting for weather exposed and moisture resistant
elements, and sight exposed surfaces.
F. Patching work shall be done by skilled mechanics experienced in the particular type of work
involved. Patching work shall conform to the standards of the Specifications where applicable
and where not specified, work shall conform to the highest standards of the trade.
G. Cut rigid materials using masonry saw or core drill. Pneumatic tools not allowed without prior
approval.
H. Restore work with new products in accordance with requirements of Contract Documents.
I. Fit work air tight to pipes, sleeves, ducts, conduit, and other penetrations through surfaces.
J. At penetrations of fire rated walls, partitions, ceiling, or floor construction, completely seal voids
with fire rated material in accordance with Section 07 84 00, to full thickness of the penetrated
element.
K. Patching:
1. Finish patched surfaces to match finish that existed prior to patching. On continuous
surfaces, refinish to nearest intersection or natural break. For an assembly, refinish entire
unit.
2. Match color, texture, and appearance.
3. Repair patched surfaces that are damaged, lifted, discolored, or showing other
imperfections due to patching work. If defects are due to condition of substrate, repair
substrate prior to repairing finish.
L. Patch or replace surfaces that are damaged, lifted, discolored, or showing other imperfections
due to patching work. Repair substrate prior to patching finish. Finish patches to produce
uniform finish and texture over entire area. When finish cannot be matched, refinish entire
surface to nearest intersections.
3.08 PROGRESS CLEANING
A. The Contractor and Subcontractors will be responsible for their own cleanup as specified and
removal of their own debris. Maintain areas free of waste materials, debris, and rubbish.
Maintain site in a clean and orderly condition.
B. Remove debris and rubbish from pipe chases, plenums, attics, crawl spaces, and other closed
or remote spaces, prior to enclosing the space.
C. Broom and vacuum clean interior areas prior to start of surface finishing, and continue cleaning
to eliminate dust.
D. Collect and remove waste materials, debris, and trash/rubbish from site periodically and
dispose off-site; do not burn or bury.
E. Do not throw waste material and rubbish down from upper levels.
F. Hammer in or bend over flush with the wood protruding nails in boards, planks, timbers, etc.
G. Dispose of hazardous wastes in accordance with applicable laws and regulations.
H. Promptly remove from the work area all waste materials and rubbish resulting from the
performance of the work. Clean up on a day-to-day basis throughout the construction period.
I. Perform continuous clean-up of flammable debris to prevent accumulation.
J. Contractors and Subcontractors shall provide for the removal of stains and overages caused by
operations, such as mastics, mortar, concrete, joint compounds, paint, caulking, etc.
K. The Contractor shall provide periodic broom cleaning of project areas using sweeping
compound as required to prevent airborne dust.
L. The Architect may require the Contractor to broom clean any area or areas of the project at any
time he feels there is excess dust or dirt, which inconveniences building occupants or finishing
operations.
25170 Brule Public Works Garage 01 70 00 - 7 EXECUTION AND CLOSEOUT
REQUIREMENTS
M. If the premises and the site are not maintained properly at all times, the Owner may have any
accumulation of waste materials or trash removed and charge the cost to the Contractor who is
responsible.
N. In addition to cleaning above, each Contractor or Subcontractor shall thoroughly clean and
vacuum floors prior to the installation of the finish flooring, such as sealing exposed slabs,
ceramic or quarry tile, sheet vinyl flooring, V.C.T., carpet, etc.
3.09 PROTECTION OF INSTALLED WORK
A. Protect installed work from damage by construction operations.
B. Provide special protection where specified in individual specification sections.
C. Provide temporary and removable protection for installed products. Control activity in immediate
work area to prevent damage.
D. Provide protective coverings at walls, projections, jambs, sills, and soffits of openings.
E. Protect finished floors, stairs, and other surfaces from traffic, dirt, wear, damage, or movement
of heavy objects, by protecting with durable sheet materials.
F. Prohibit traffic or storage upon waterproofed or roofed surfaces. If traffic or activity is necessary,
obtain recommendations for protection from waterproofing or roofing material manufacturer.
G. Remove protective coverings when no longer needed; reuse or recycle plastic coverings if
possible.
3.10 SYSTEM STARTUP
A. Coordinate schedule for start-up of various equipment and systems.
B. Verify that each piece of equipment or system has been checked for proper lubrication, drive
rotation, belt tension, control sequence, and for conditions that may cause damage.
C. Verify tests, meter readings, and specified electrical characteristics agree with those required
by the equipment or system manufacturer.
D. Verify that wiring and support components for equipment are complete and tested.
E. Execute start-up under supervision of applicable Contractor personnel and manufacturer's
representative in accordance with manufacturers' instructions.
F. When specified in individual specification Sections, require manufacturer to provide authorized
representative to be present at site to inspect, check, and approve equipment or system
installation prior to start-up, and to supervise placing equipment or system in operation.
G. Submit a written report that equipment or system has been properly installed and is functioning
correctly.
3.11 DEMONSTRATION AND INSTRUCTION
A. Demonstrate operation and maintenance of products to Owner's personnel two weeks prior to
date of Substantial Completion.
B. Demonstrate start-up, operation, control, adjustment, trouble-shooting, servicing, maintenance,
and shutdown of each item of equipment at scheduled time, at equipment location.
C. For equipment or systems requiring seasonal operation, perform demonstration for other
season within six months.
D. Provide a qualified person who is knowledgeable about the Project to perform demonstration
and instruction of owner personnel.
E. Utilize operation and maintenance manuals as basis for instruction. Review contents of manual
with Owner's personnel in detail to explain all aspects of operation and maintenance.
F. Prepare and insert additional data in operations and maintenance manuals when need for
additional data becomes apparent during instruction.
G. The amount of time required for instruction on each item of equipment and system is that
specified in individual sections.
25170 Brule Public Works Garage 01 70 00 - 8 EXECUTION AND CLOSEOUT
REQUIREMENTS
3.12 ADJUSTING
A. Adjust operating products and equipment to ensure smooth and unhindered operation.
3.13 FINAL CLEANING
A. At Completion of the Work promptly remove tools, equipment, machinery, and surplus materials
from the Project site.
B. The Masonry Trade Contractor is responsible for final cleaning of all masonry surfaces.
C. Use cleaning materials that are nonhazardous.
D. Leave all surfaces broom clean and ready for final cleaning unless otherwise required by the
Specifications.
E. Clean interior and exterior glass, surfaces exposed to view; remove temporary labels, stains
and foreign substances, polish transparent and glossy surfaces, vacuum carpeted and soft
surfaces.
F. Remove all labels that are not permanent. Do not paint or otherwise cover fire test labels or
nameplates on mechanical and electrical equipment.
G. Clean equipment and fixtures to a sanitary condition with cleaning materials appropriate to the
surface and material being cleaned.
H. The Mechanical Contractor shall clean all ductwork and grills (in and out), and polish all
plumbing fixtures, trim, etc.
I. If air handling equipment is operated during construction, filters for air handling equipment shall
be replaced or thoroughly cleaned according to manufacturer's instructions, by the HVAC
contractor. Clean filters of operating equipment.
J. The electrical subcontractor shall wash, vacuum, dust or otherwise clean light fixtures and other
electrical work in finished spaces as necessary to remove all stains, dust and dirt. Other
electrical equipment in mechanical rooms, transformer vaults, switch gear rooms, and similar
unfinished spaces shall be left "broom clean". Burned out lamps shall be replaced.
K. All areas within lights, ducts, chases and other items, areas or equipment which will be "closed
up" by the Contractor, as a part of the work of their contract, shall be thoroughly cleaned by the
Contractor prior to closing up.
L. Clean debris from roofs, gutters, downspouts, and drainage systems.
M. Clean site; sweep paved areas, rake clean landscaped surfaces.
N. Remove waste, surplus materials, trash/rubbish, and construction facilities from the site;
dispose of in legal manner; do not burn or bury.
O. The Contractor shall arrange for professional cleaners or experienced workmen for other final
cleaning, to remove dust, dirt, finger prints and labels from all interior and exterior surfaces and
to polish glossy surfaces to a clear shine.
P. The Work shall be maintained in a clean condition until the Architect determines that the Project
is substantially complete.
Q. Cleaning required by subsequent work done after Substantial Completion shall be carried out
by the Contractor or Subcontractor of the required work and shall be accomplished prior to
Final Completion.
3.14 CLOSEOUT PROCEDURES
A. Make submittals that are required by governing or other authorities.
B. Notify Architect when work is considered ready for Substantial Completion.
1. When the Work is considered Substantially Complete, as defined in the General
Conditions THE PRIME OR PRIME TRADE CONTRACTOR shall submit to the Architect:
a. A written notice that the Work, or designated portion thereof, is substantially
complete.
b. A list of items to be completed or corrected.
25170 Brule Public Works Garage 01 70 00 - 9 EXECUTION AND CLOSEOUT
REQUIREMENTS
2. Within a reasonable time after receipt of such notice, Architect will make a pre-final
inspection to determine the status of completion.
3. Should the Architect determine that the Work is not Substantially Complete:
a. Architect will promptly notify the Contractor in writing, giving the reasons therefor.
b. Contractor will remedy the deficiencies in the Work, and send a second written notice
of Substantial Completion to the Architect.
c. The Architect will reinspect the Work.
C. Should the Architect determine that the Work is not Substantially Complete:
1. Architect will promptly notify the Contractor in writing, giving the reasons therefor.
a. Contractor will remedy the deficiencies in the Work, and send a second written notice
of Substantial Completion to the Architect.
b. The Architect will reinspect the Work.
c. When the Architect finds that the Work of all Contractors is Substantially Complete,
the Architect will execute and deliver to Certificates of Substantial Completion to the
Prime contractor with a revised list of items to be completed or corrected before final
payment.
D. Submit written certification that Contract Documents have been reviewed, work has been
inspected, and that work is complete in accordance with Contract Documents and ready for
Architect's review.
E. Correct items of work listed in executed Certificates of Substantial Completion and comply with
requirements for access to Owner-occupied areas.
F. Notify Architect when work is considered finally complete.
1. When the Work is considered complete, submit written certification to the Architect along
with a copy of the punch list confirming completion of each individual item listed, that:
a. Contract Documents have been reviewed.
b. Work has been inspected for compliance with Contract Documents.
c. Work has been completed in accordance with Contract Documents.
d. Equipment and systems have been tested in the presence of the Owner's
Representative and are operational.
e. Work is clean and ready for final inspection.
2. Upon receipt of the above certification, the Architect/Engineer shall set a date for final
inspection to be made only when the project is complete and when all deficiencies of the
pre-final inspection have been corrected.
3. One week prior to this date, the Architect will inform the Owner and contractors of this
inspection in writing.
4. Immediately following this inspection, the Architect shall prepare a written report listing the
names of all persons present at the inspection and the Architect shall prepare a punch list
of all deficiencies for completion and correction. Copies of this report will be provided to
the Owner, General contractor and the bonding company.
5. Should Architect consider that the Work is incomplete or defective:
a. Architect will promptly notify the Contractor or Contractors in writing, listing the
incomplete or defective work.
b. Contractor will take immediate steps to correct the stated deficiencies, and send a
second written certification to Architect that the Work is complete.
c. Architect will re-inspect the Work.
d. Contractor or Contractors will be responsible for any reinspection cost incurred by
Owner due to the necessity of the Architect's re-inspection.
G. Final Completion:
1. Test Reports and Certificates: Provide all test reports and certificates required in the
technical sections, prior to final payment. Provide a check list of required reports and
certificates, by Specifications sections.
2. Retention of Records: Retain all records as required by law and good business practice.
3. Remove all temporary utilities as the job progress permits.
25170 Brule Public Works Garage 01 70 00 - 10 EXECUTION AND CLOSEOUT
REQUIREMENTS
4. Temporary Facilities: As the job progresses and facilities are no longer needed, they shall
be removed by the Contractor. Prior to final payment, remove temporary sheds, fences,
barricades, surplus materials, debris and other material or items not part of the Project.
H. Closeout Submittals:
1. When the Owner has determined that the Work is acceptable under the Contract
Documents and the Contract fully performed, Contractor shall prepare and submit final
Application for Payment to the Architect together with the following:
a. Insurance: Refer to Section 00 73 00.
1) The specified Property Insurance (Multiple Peril Builder's Risk) shall be
maintained until final acceptance by the Owner of the entire Project.
b. Contractor's Affidavit of Payment of Debts and Claims, AIA Document G706.
c. Consent of surety to final payment of Consent of Surety Company to Final Payment,
AIA Document G707. The Consent of the Surety Company must be obtained prior to
any reduction of retained percentage and prior to final payment.
d. Minnesota Department of Revenue "Withholding Affidavit for Contractors" document
IC-134, fully completed and certified.
e. Evidence of Compliance with requirements of governing authorities:
1) Certificate of Inspection from all required agencies and departments.
2) Certificate of Occupancy.
f. Operating and Maintenance Data, Instructions to Owner's Personnel.
g. Warranties and Bonds.
h. Project Record Documents.
i. Special tools required for Owner maintenance.
2. Submit four copies each of Items b and c above, and two copies each of Items a and
d through f.
I. Complete items of work determined by Architect's final inspection.
J. Final Adjustment of Accounts:
1. Submit a Final Statement of accounting to the Architect.
2. Reflect all adjustments to the Contract Sum in the statement as follows:
a. The original Contract Sum.
b. Additions and deductions resulting from:
1) Previous Change Orders
2) Unit Prices.
3) Deductions for uncorrected Work.
4) Deductions for Re-inspection Payments.
5) Other Adjustments.
c. Total Contract Sum, as adjusted.
d. Previous Payments.
e. Sum Remaining Due.
3. Submit the final Application for Payment in accordance with procedures and requirements
stated in the Conditions of the Contract.
K. Corrective Work & Follow-Up Inspections: The Owner shall notify the Contractor of required
corrective work after completion, and the Contractor shall actively supervise such Work. The
Institution shall not be inconvenienced as to prompt service and/or corrections by the
Contractor that may be necessary.
END OF SECTION
25170 Brule Public Works Garage 01 78 00 - 1 CLOSEOUT SUBMITTALS
SECTION 01 78 00
CLOSEOUT SUBMITTALS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Project Record Documents.
B. Operation and Maintenance Data.
C. Warranties and bonds.
1.02 RELATED REQUIREMENTS
A. Section 00 72 00 - General Conditions: Performance bond and labor and material payment
bonds, warranty, and correction of work.
B. Section 01 30 00 - Administrative Requirements: Submittals procedures, shop drawings,
product data, and samples.
C. Section 01 70 00 - Execution and Closeout Requirements: Contract closeout procedures.
D. Individual Product Sections: Specific requirements for operation and maintenance data.
E. Individual Product Sections: Warranties required for specific products or Work.
1.03 SUBMITTALS
A. Project Record Documents: Submit documents to Architect with claim for final Application for
Payment.
B. Operation and Maintenance Data:
1. Prepare data in the form of an instructional manual for use by the Owner's personnel.
2. Format shall conform to the following:
a. Size 8-1/2" x 11"
b. Text: Manufacturer's printed data, or neatly typewritten.
c. Cover: Identify each volume with typed or printed title "OPERATING AND
MAINTENANCE INSTRUCTIONS". List:
1) Title of Project
2) Identity of separate structure as applicable.
3) Identity of general subject matter covered in the manual.
d. Provide fly-leaf for each separate product, or each piece of operating equipment.
1) Provide typed description of product, and major component parts of equipment.
2) Provide indexed tabs.
e. Cover: Identify each volume with typed or printed title "OPERATING AND
MAINTENANCE INSTRUCTIONS". List:
1) Title of Project
2) Identity of separate structure as applicable.
3) Identity of general subject matter covered in the manual.
3. Binders
a. Commercial quality three-ring binders with durable and cleanable plastic covers.
b. When multiple binders are used, correlate the data into related consistent groupings.
C. Content of Manual:
1. Arrange neatly a typewritten table of contents for each volume, in the following systematic
order.
a. Trade Contractor, name of responsible principal, address and telephone number.
b. A list of each product required to be included, indexed to the content of the volume.
c. List, with each product, the name, address and telephone number of:
1) Trade Contractor or installer
2) Maintenance contractor, as appropriate
3) Identify the area of responsibility of each
4) Local source of supply for parts and replacement
25170 Brule Public Works Garage 01 78 00 - 2 CLOSEOUT SUBMITTALS
d. Identify each product by product name and other identifying symbols as set forth in
Contract Documents.
2. Product Data
a. Include only those sheets which are pertinent to the specific product.
b. Annotate each sheet to:
1) Clearly identify the specific product or part installed.
2) Clearly identify the data applicable to the installation.
3) Delete references to inapplicable information.
3. Written text, as required to supplement product data for the particular installation:
a. Organize in a consistent format under separate headings for different procedures.
b. Provide a logical sequence of instructions for each procedure.
c. Do not use Project Record Documents as maintenance drawings.
4. Submit two copies of preliminary draft or proposed formats and outlines of contents before
start of Work. Architect will review draft and return one copy with comments.
5. For equipment, or component parts of equipment put into service during construction and
operated by Owner, submit completed documents within ten days after acceptance.
6. Submit one copy of completed documents 15 days prior to final inspection. This copy will
be reviewed and returned after final inspection, with Architect comments. Revise content
of all document sets as required prior to final submission.
7. Submit two sets of revised final documents in final form within 10 days after final
inspection.
D. Warranties and Bonds:
1. For equipment or component parts of equipment put into service during construction with
Owner's permission, submit documents within 10 days after acceptance.
2. Make other submittals within 10 days after Date of Substantial Completion, prior to final
Application for Payment.
3. For items of Work for which acceptance is delayed beyond Date of Substantial
Completion, submit within 10 days after acceptance, listing the date of acceptance as the
beginning of the warranty period.
4. Copy of each warranty, bond and service contract issued.
a. Provide information sheet for Owner's personnel, give:
1) Proper procedures in the event of failure.
2) Instances which might affect the validity of warranties or bonds.
b. Provide a logical sequence of instructions for each procedure.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 PROJECT RECORD DOCUMENTS
A. Maintain on site one set of the following record documents; record actual revisions to the Work:
1. Drawings.
2. Specifications.
3. Addenda.
4. Change Orders and other modifications to the Contract.
5. Reviewed shop drawings, product data, and samples.
6. Manufacturer's instruction for assembly, installation, and adjusting.
7. Architect/Engineer Field Orders or written instructions.
8. Field test records.
B. Ensure entries are complete and accurate, enabling future reference by Owner.
C. Store record documents separate from documents used for construction.
D. Record information concurrent with construction progress.
E. Maintain record documents in a clean, dry, legible condition and in good order. Do not use
record documents for construction purposes.
25170 Brule Public Works Garage 01 78 00 - 3 CLOSEOUT SUBMITTALS
F. Make record documents and samples available at all times for inspection by Architect and/or
Owner.
G. Specifications: Legibly mark and record at each product section description of actual products
installed, including the following:
1. Manufacturer's name and product model and number.
2. Product substitutions or alternates utilized.
3. Changes made by Addenda and modifications.
H. Record Drawings and Shop Drawings: Legibly mark each item to record actual construction
including:
1. Measured depths of foundations in relation to finish first floor datum.
2. Measured horizontal and vertical locations of underground utilities and appurtenances,
referenced to permanent surface improvements.
3. Measured locations of internal utilities and appurtenances concealed in construction,
referenced to visible and accessible features of the Work.
4. Field changes of dimension and detail.
5. Changes made by Field Order or by Change Orders.
6. Details not on original Contract drawings.
3.02 OPERATION AND MAINTENANCE DATA
A. For Each Product or System: List names, addresses and telephone numbers of Subcontractors
and suppliers, including local source of supplies and replacement parts.
B. Product Data: Mark each sheet to clearly identify specific products and component parts, and
data applicable to installation. Delete inapplicable information.
C. Drawings: Supplement product data to illustrate relations of component parts of equipment and
systems, to show control and flow diagrams. Do not use Project Record Documents as
maintenance drawings.
D. Typed Text: As required to supplement product data. Provide logical sequence of instructions
for each procedure, incorporating manufacturer's instructions.
3.03 OPERATION AND MAINTENANCE DATA FOR MATERIALS AND FINISHES
A. For Each Product, Applied Material, and Finish:
1. Product data, with catalog number, size, composition, and color and texture designations.
2. Information for re-ordering custom manufactured products.
B. Instructions for Care and Maintenance: Manufacturer's recommendations for cleaning agents
and methods, precautions against detrimental cleaning agents and methods, and
recommended schedule for cleaning and maintenance.
3.04 OPERATION AND MAINTENANCE DATA FOR EQUIPMENT AND SYSTEMS
A. For Each Item of Equipment and Each System:
1. Description of unit or system, and component parts.
2. Identify function, normal operating characteristics, and limiting conditions.
3. Include performance curves, with engineering data and tests.
4. Complete nomenclature and model number of replaceable parts.
B. Panelboard Circuit Directories: Provide electrical service characteristics, controls, and
communications; typed.
C. Include color coded wiring diagrams as installed.
D. Operating Procedures: Include start-up, break-in, and routine normal operating instructions and
sequences. Include regulation, control, stopping, shut-down, and emergency instructions.
Include summer, winter, and any special operating instructions.
E. Maintenance Requirements: Include routine procedures and guide for preventative
maintenance and trouble-shooting; disassembly, repair, and reassembly instructions; and
alignment, adjusting, balancing, and checking instructions.
25170 Brule Public Works Garage 01 78 00 - 4 CLOSEOUT SUBMITTALS
F. Provide servicing and lubrication schedule, and list of lubricants required.
G. Include manufacturer's printed operation and maintenance instructions.
H. Include sequence of operation by controls manufacturer.
I. Provide original manufacturer's parts list, illustrations, assembly drawings, and diagrams
required for maintenance.
J. Provide control diagrams by controls manufacturer as installed.
K. Provide Contractor's coordination drawings, with color coded piping diagrams as installed.
L. Provide charts of valve tag numbers, with location and function of each valve, keyed to flow and
control diagrams.
M. Provide list of original manufacturer's spare parts, current prices, and recommended quantities
to be maintained in storage.
N. Include test and balancing reports.
O. Additional Requirements: As specified in individual product specification sections.
3.05 OPERATION AND MAINTENANCE MANUALS
A. Prepare instructions and data by personnel experienced in maintenance and operation of
described products.
B. Prepare data in the form of an instructional manual.
C. Binders: Commercial quality, 8-1/2 by 11 inch three D side ring binders with durable plastic
covers; 2 inch maximum ring size. When multiple binders are used, correlate data into related
consistent groupings.
D. Cover: Identify each binder with typed or printed title OPERATION AND MAINTENANCE
INSTRUCTIONS; identify title of Project; identify subject matter of contents.
E. Provide tabbed dividers for each separate product and system, with typed description of
product and major component parts of equipment.
F. Text: Manufacturer's printed data, or typewritten data on 24 pound paper.
G. Drawings: Provide with reinforced punched binder tab. Bind in with text; fold larger drawings to
size of text pages.
H. Arrange content by systems under section numbers and sequence of Table of Contents of this
Project Manual.
I. Contents: Prepare a Table of Contents for each volume, with each product or system
description identified, in three parts as follows:
1. Part 1: Directory, listing names, addresses, and telephone numbers of Architect,
Contractor, Subcontractors, and major equipment suppliers.
2. Part 2: Operation and maintenance instructions, arranged by system and subdivided by
specification section. For each category, identify names, addresses, and telephone
numbers of Subcontractors and suppliers. Identify the following:
a. Significant design criteria.
b. List of equipment.
c. Parts list for each component.
d. Operating instructions.
e. Maintenance instructions for equipment and systems.
f. Maintenance instructions for special finishes, including recommended cleaning
methods and materials, and special precautions identifying detrimental agents.
3. Part 3: Project documents and certificates, including the following:
a. Shop drawings and product data.
b. Air and water balance reports.
c. Certificates.
d. Photocopies of warranties and bonds.
25170 Brule Public Works Garage 01 78 00 - 5 CLOSEOUT SUBMITTALS
J. Provide a listing in Table of Contents for design data, with tabbed dividers and space for
insertion of data.
K. Table of Contents: Provide title of Project; names, addresses, and telephone numbers of
Architect, Consultants, and Contractor with name of responsible parties; schedule of products
and systems, indexed to content of the volume.
3.06 WARRANTIES AND BONDS
A. Obtain warranties and bonds, executed in duplicate by responsible Subcontractors, suppliers,
and manufacturers, within 10 days after completion of the applicable item of work. Except for
items put into use with Owner's permission, leave date of beginning of time of warranty until the
Date of Substantial completion is determined.
B. Verify that documents are in proper form, contain full information, and are notarized.
C. Co-execute submittals when required.
D. Retain warranties and bonds until time specified for submittal.
E. Manual: Bind in commercial quality 8-1/2 by 11 inch three D side ring binders with durable
plastic covers.
F. Cover: Identify each binder with typed or printed title WARRANTIES AND BONDS, with title of
Project; name, address and telephone number of Contractor and equipment supplier; and name
of responsible company principal.
G. Table of Contents: Neatly typed, in the sequence of the Table of Contents of the Project
Manual, with each item identified with the number and title of the specification section in which
specified, and the name of product or work item.
H. Separate each warranty or bond with index tab sheets keyed to the Table of Contents listing.
Provide full information, using separate typed sheets as necessary. List Subcontractor,
supplier, and manufacturer, with name, address, and telephone number of responsible
principal.
END OF SECTION
25170 Brule Public Works Garage CONCRETE FORMING
03 10 00 - 1 AND ACCESSORIES
SECTION 03 10 00
CONCRETE FORMING AND ACCESSORIES
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Formwork for cast-in place concrete, with shoring, bracing and anchorage.
B. Openings for other work.
C. Form accessories.
D. Form stripping.
1.02 RELATED REQUIREMENTS
A. Section 03 20 00 - Concrete Reinforcing.
B. Section 03 30 00 - Cast-in-Place Concrete.
1.03 REFERENCE STANDARDS
A. ACI 117 - Standard Specifications for Tolerances for Concrete Construction and Materials;
2010.
B. ACI 301 - Specifications for Structural Concrete for Buildings; American Concrete Institute;
2010.
1.04 DESIGN REQUIREMENTS
A. Design, engineer and construct formwork, shoring and bracing to conform to design and code
requirements; resultant concrete to conform to required shape, line and dimension.
1.05 QUALITY ASSURANCE
A. Perform work of this section in accordance with ACI 347, ACI 301, and ACI 318.
1.06 REGULATORY REQUIREMENTS
A. Conform to applicable code for design, fabrication, erection and removal of formwork.
PART 2 PRODUCTS
2.01 FORMWORK - GENERAL
A. Provide concrete forms, accessories, shoring, and bracing as required to accomplish
cast-in-place concrete work.
B. Design and construct to provide resultant concrete that conforms to design with respect to
shape, lines, and dimensions.
C. Comply with applicable State and local codes with respect to design, fabrication, erection, and
removal of formwork.
2.02 WOOD FORM MATERIALS
A. Form Materials: At the discretion of the Contractor.
2.03 REMOVABLE PREFABRICATED FORMS
A. Preformed Steel Forms: Minimum 16 gage matched, tight fitting, stiffened to support weight of
concrete without deflection detrimental to tolerances and appearance of finished surfaces.
B. Preformed Plastic Forms: Thermoplastic polystyrene form liner, tight fitting, stiffened to support
weight of concrete without deflection detrimental to tolerances and appearance of finished
surfaces.
C. Glass Fiber Fabric Reinforced Plastic Forms: Matched, tight fitting, stiffened to support weight
of concrete without deflection detrimental to tolerances and appearance of finished concrete
surfaces.
25170 Brule Public Works Garage CONCRETE FORMING
03 10 00 - 2 AND ACCESSORIES
2.04 FORMWORK ACCESSORIES
A. Form Ties: Removable type, galvanized metal, fixed length, cone type, with waterproofing
washer, free of defects that could leave holes larger than 1 inch in concrete surface.
B. Form Release Agent: Colorless mineral oil that will not stain concrete, absorb moisture, impair
natural bonding of concrete finish coatings, or affect color characteristics of concrete finish
coatings.
1. Sonneborn - Cast-Off
2. Sika - Formtex
3. W.R. Meadows - Duogard II
4. Tamms: Aquaform
5. Substitutions: See Section 01 60 00 - Product requirements.
C. Nails, Spikes, Lag Bolts, Through Bolts, Anchorages: Sized as required, of sufficient strength
and character to maintain formwork in place while placing concrete.
D. Embedded Anchor Shapes, Plates, Angles and Bars: As specified.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify lines, levels and centers before proceeding with formwork. Ensure that dimensions agree
with drawings.
3.02 ERECTION - FORMWORK
A. Erect formwork, shoring and bracing to achieve design requirements, in accordance with
requirements of ACI 301.
B. Provide bracing to ensure stability of formwork. Shore or strengthen formwork subject to
overstressing by construction loads.
C. Arrange and assemble formwork to permit dismantling and stripping. Do not damage concrete
during stripping. Permit removal of remaining principal shores.
D. Align joints and make watertight. Keep form joints to a minimum.
3.03 APPLICATION - FORM RELEASE AGENT
A. Apply form release agent on formwork in accordance with manufacturer's recommendations.
3.04 INSERTS, EMBEDDED PARTS, AND OPENINGS
A. Provide formed openings where required for items to be embedded in passing through concrete
work.
B. Locate and set in place items that will be cast directly into concrete.
C. Coordinate with work of other sections in forming and placing openings, slots, reglets,
recesses, sleeves, bolts, anchors, other inserts, and components of other work.
D. Install accessories in accordance with manufacturer's instructions, so they are straight, level,
and plumb. Ensure items are not disturbed during concrete placement.
3.05 FORM CLEANING
A. Clean forms as erection proceeds, to remove foreign matter within forms.
B. Clean formed cavities of debris prior to placing concrete.
1. Flush with water or use compressed air to remove remaining foreign matter. Ensure that
water and debris drain to exterior through clean-out ports.
2. During cold weather, remove ice and snow from within forms. Do not use de-icing salts.
Do not use water to clean out forms, unless formwork and concrete construction proceed
within heated enclosure. Use compressed air or other means to remove foreign matter.
3.06 FORMWORK TOLERANCES
A. Construct formwork to maintain tolerances required by ACI 117, unless otherwise indicated.
25170 Brule Public Works Garage CONCRETE FORMING
03 10 00 - 3 AND ACCESSORIES
3.07 FORM REMOVAL
A. Do not remove forms or bracing until concrete has gained sufficient strength to carry its own
weight and imposed loads.
B. Loosen forms carefully. Do not wedge pry bars, hammers, or tools against finish concrete
surfaces scheduled for exposure to view.
END OF SECTION
25170 Brule Public Works
Garage
03 20 00 - 1 CONCRETE REINFORCING
SECTION 03 20 00
CONCRETE REINFORCING
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Reinforcing steel for cast-in-place concrete.
B. Supports and accessories for steel reinforcement.
1.02 RELATED REQUIREMENTS
A. Section 03 10 00 - Concrete Forming and Accessories.
B. Section 03 30 00 - Cast-in-Place Concrete.
1.03 REFERENCE STANDARDS
A. ACI 301 - Specifications for Structural Concrete for Buildings; American Concrete Institute
International; 2020.
B. ACI 318 - Building Code Requirements For Structural Concrete and Commentary; American
Concrete Institute International; 2014 (Errata 2018).
C. ACI SP-66 - ACI Detailing Manual; American Concrete Institute International; 2004.
D. ASTM A184/A184M - Standard Specification for Welded Deformed Steel Bar Mats for Concrete
Reinforcement 2019.
E. ASTM A615/A615M - Standard Specification for Deformed and Plain Billet-Steel Bars for
Concrete Reinforcement; 2020.
F. AWS D1.4/D1.4M - Structural Welding Code - Reinforcing Steel; American Welding Society;
2018.
G. CRSI (DA4) - Manual of Standard Practice; Concrete Reinforcing Steel Institute; 2019.
1.04 SUBMITTALS
A. See Section 01 30 00 - Administrative Requirements, for submittal procedures.
B. Shop Drawings: Comply with requirements of ACI SP-66. Include bar schedules, shapes of
bent bars, spacing of bars, and location of splices.
1.05 QUALITY ASSURANCE
A. Perform work of this section in accordance with ACI 301.
B. Welders' Certificates: Submit certifications for welders employed on the project, verifying AWS
qualification within the previous 12 months.
PART 2 PRODUCTS
2.01 REINFORCEMENT
A. Reinforcing Steel: ASTM A615/A615M, Grade 60 (60,000 psi).
1. Deformed billet-steel bars.
2. Unfinished.
B. Reinforcement Accessories:
1. Tie Wire: Annealed, minimum 16 gage, 0.0508 inch.
2. Chairs, Bolsters, Bar Supports, Spacers: Sized and shaped for adequate support of
reinforcement during concrete placement.
2.02 FABRICATION
A. Fabricate concrete reinforcing in accordance with CRSI (DA4) - Manual of Standard Practice.
B. Welding of reinforcement is permitted only with the specific approval of Architect. Perform
welding in accordance with AWS D1.4/D1.4M.
C. Locate reinforcing splices not indicated on drawings at point of minimum stress.
25170 Brule Public Works
Garage
03 20 00 - 2 CONCRETE REINFORCING
PART 3 EXECUTION
3.01 PLACEMENT
A. Place, support and secure reinforcement against displacement. Do not deviate from required
position.
B. Do not displace or damage vapor barrier.
C. Accommodate placement of formed openings.
D. Conform to applicable code for concrete cover over reinforcement.
END OF SECTION
25170 Brule Public Works
Garage
03 30 00 - 1 CAST-IN-PLACE CONCRETE
SECTION 03 30 00
CAST-IN-PLACE CONCRETE
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Concrete building frame members.
B. Floors and slabs on grade.
C. Joint devices associated with concrete work.
D. Concrete curing.
1.02 RELATED REQUIREMENTS
A. Section 03 10 00 - Concrete Forming and Accessories: Forms and accessories for formwork.
B. Section 03 20 00 - Concrete Reinforcing.
C. Section 07 90 05 - Joint Sealers: Sealants for saw cut joints and isolation joints in slabs.
1.03 REFERENCE STANDARDS
A. A. ACI 117 - Specifications for Tolerances for Concrete Construction and Materials 2010
(Reapproved 2015).
B. ACI 211.1 - Standard Practice for Selecting Proportions for Normal, Heavyweight, and Mass
Concrete 1991 (Reapproved 2009).
C. ACI 301 - Specifications for Structural Concrete 2016.
D. ACI 302.1R - Guide to Concrete Floor and Slab Construction 2015.
E. ACI 304R - Guide for Measuring, Mixing, Transporting, and Placing Concrete 2000
(Reapproved 2009).
F. ACI 305R - Guide to Hot Weather Concreting 2010.
G. ACI 306R - Guide to Cold Weather Concreting 2016.
H. ACI 308R - Guide to External Curing of Concrete 2016.
I. ACI 318 - Building Code Requirements for Structural Concrete and Commentary 2014 (Errata
2018).
J. ASTM C33/C33M - Standard Specification for Concrete Aggregates 2018.
K. ASTM C39/C39M - Standard Test Method for Compressive Strength of Cylindrical Concrete
Specimens 2020.
L. ASTM C143/C143M - Standard Test Method for Slump of Hydraulic-Cement Concrete 2020.
M. ASTM C150/C150M - Standard Specification for Portland Cement 2020.
N. ASTM C171 - Standard Specification for Sheet Materials for Curing Concrete 2016.
O. ASTM C618 - Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan
for Use in Concrete 2019.
P. ASTM C685/C685M - Standard Specification for Concrete Made by Volumetric Batching and
Continuous Mixing 2017.
Q. ASTM C1059/C1059M - Standard Specification for Latex Agents for Bonding Fresh to
Hardened Concrete 2013.
R. ASTM C1240 - Standard Specification for Silica Fume Used in Cementitious Mixtures 2020.
S. ASTM D1751 - Standard Specification for Preformed Expansion Joint Filler for Concrete Paving
and Structural Construction (Non-extruding and Resilient Bituminous Types) 2018.
T. ASTM D2103 - Standard Specification for Polyethylene Film and Sheeting 2015.
U. ASTM E1155 - Standard Test Method for Determining FF Floor Flatness and FL Floor
Levelness Numbers 2020.
25170 Brule Public Works
Garage
03 30 00 - 2 CAST-IN-PLACE CONCRETE
V. ASTM E1155M - Standard Test Method for Determining F(F) Floor Flatness and F(L) Floor
Levelness Numbers (Metric) 2014.
W. ICRI 310.2R - Selecting and Specifying Concrete Surface Preparation for Sealers, Coatings,
Polymer Overlays, and Concrete Repair 2013.
1.04 SUBMITTALS
A. See Section 01 30 00 - Administrative Requirements, for submittal procedures.
B. Submit concrete mix design to the Architect for approval
C. Product Data: Submit manufacturers' data on manufactured products showing compliance with
specified requirements and installation instructions.
D. Project Record Documents: Accurately record actual locations of embedded utilities and
components that will be concealed from view upon completion of concrete work.
1.05 QUALITY ASSURANCE
A. Perform work of this section in accordance with ACI 301 and ACI 318.
B. Follow recommendations of ACI 305R when concreting during hot weather.
C. Follow recommendations of ACI 306R when concreting during cold weather.
PART 2 PRODUCTS
2.01 FORMWORK
A. Comply with requirements of Section 03 10 00.
2.02 REINFORCEMENT
A. Comply with requirements of Section 03 20 00.
2.03 CONCRETE MATERIALS
A. Cement: ASTM C150/C150M, Type I - Normal Portland type.
B. Fine and Coarse Aggregates: ASTM C 33.
1. Course Aggregate Material: Strong, clean crushed granite or limestone gravel, are subject
to approval as to use, other inert material having similar characteristics, free from
adherent coatings and injurious amount of friable or fragile pieces, flake organic matter, or
other deleterious substances, all meeting the following gradation requirements:
a. Footings - 1"
b. Foundations - 1"
c. Slabs - 1"
2. Fine Aggregate Material: Clean, strong, natural are subject to approval and authorization
as to use, other inert material suitable for the work to be done, having characteristics
similar to natural sand, free of frozen materials, all meeting the following grading limits:
a. Passing No. 4 Sieve: 95% to 100%
b. Passing No. 14 Sieve: 45% to 80%
c. Passing No. 50 Sieve: 10% to 30%
d. Passing No. 100 Sieve: 2% to 10%
C. Fly Ash: ASTM C618, Class F.
D. Silica Fume: ASTM C1240, proportioned in accordance with ACI 211.1.
E. Water: Clean and not detrimental to concrete.
2.04 ADMIXTURES
A. Do not use chemicals that will result in soluble chloride ions in excess of 0.1 percent by weight
of cement.
B. Air Entrainment Admixture: ASTM C 260 to produce Air Entrainment of between 5% to 7%.
None - N/A Air entrainment admixture shall be used in strict accordance with the
manufacturers recommendations and shall be one of the following or approved equal:
1. W.R. Grace - Darex AEA
25170 Brule Public Works
Garage
03 30 00 - 3 CAST-IN-PLACE CONCRETE
2. Protex Industries - Pro-Air
3. W.R. Meadows - Sealtight Air Entrainment Agent
4. Sika - Sika AER
5. Euclid - Air Mix
C. Chemical Admixtures: ASTM C 494/C 494M, Type A - Water Reducing.
1. Provide products manufactured by Sika Corporation or The Euclid Chemical Company.
2. Water reducing admixtures are required for concrete slabs on grade to produce a water to
cement ratio of 0.45. Submit manufacturer's literature for the specific water reducing
admixture to be provided based on mix designers experience for results to be achieved
based on specific conditions of the concrete pour.
2.05 ACCESSORY MATERIALS
A. Underslab Vapor Retarder: High density polyethylene meeting the requirements of ASTM E
1745, Class A and with the following minimum characteristics:
1. Tensile Strength per ASTM E 154, Section 9: 45.0 lbf/in.
2. Puncture Resistance per ASTM D 1709, Method B: 2200 grams.
3. Permeance per ASTM E 96: 0.018 perms.
4. Under Slab Vapor Retarders shall be as manufactured by one of the following or approved
equal:
a. Barrier Bac, Inc. - VB 250; 509 South Wall Street, Calhoun, GA 30701; phone 877-
237-2841.
b. Raven Industries Inc. - Vapor Block 15; 1812 E. Ave., Sioux Falls, SD 57104; phone
800-635-3456.
c. Reef Industries, Inc. - 15 Mil Green; PO Box 750250, Houston, TX 77275-0250;
phone 713-507-4200.
d. W.R. Meadows, Inc. - Perminator 15 Mil; P.O. Box 338, Hampshire, IL 60140-0338;
phone 800-342-5976.
e. Stego Industries LLC - Stego Wrap 15 mil Class A, 27442 Calle Arroyo, Suite A, San
Juan, CA 92675; phone 877-464-7834.
f. Insulation Solutions Inc. - Viper VaporCheck II 15 mil Class A, 401 Truck Haven
Road, East Peoria, Il 61611; phone 866-698-6562.
5. Furnish all sealants, sealing tapes, pipe boots and other accessories as required by the
manufacturer for a complete installation.
B. Underslab Vapor Retarder: ASTM E 1745, Class A, as specified in herein. Single ply
polyethylene is prohibited.
C. Underslab Vapor Retarder: Multi-layer, fabric-, cord-, grid-, or aluminum-reinforced
polyethylene or equivalent, complying with ASTM E 1745, Class A; stated by manufacturer as
suitable for installation in contact with soil or granular fill under concrete slabs. Single ply
polyethylene is prohibited. Vapor Retarder shall be as specified in Section.
1. Accessory Products: Vapor retarder manufacturer's recommended tape, adhesive,
mastic, prefabricated boots, etc., for sealing seams and penetrations in vapor retarder.
D. Moisture-Retaining Cover: ASTM C171; clear polyethylene.
E. Underlayment for leveling floors to tolerances shall be portland cement based pourable
underlayment. Furnish primers as recommended by the manufacturer. Self-leveling
underlayment shall be as manufactured by one of the following or approved equal:
1. Ardex Inc. - K-15
2. Sika - Sikaset
3. Euclid Chemical Company - Flo-Top
4. Tamms - Thin Patch
F. Liquid Densifier/Sealer: Sodium Silicate Concrete Compound, liquid type. Chemical Hardener
shall be as manufactured by one of the following or approved equal:
1. Sonneborn - Kure-N-Hard
2. TK Products - TK-5329 Floor Hardener and Densifier.
25170 Brule Public Works
Garage
03 30 00 - 4 CAST-IN-PLACE CONCRETE
3. L&M Construction Chemicals - Chem Hard
4. Euclid - Euco Diamond Hard
5. Vexcon Chemicals, Inc. - Starseal PS Clear.
6. Curecrete Chemical Company, Inc. - Ashford Formula
G. Curing/Sealing Concrete Surfaces: Curing/Sealing compound shall be high solids, non-
yellowing methyl methacrylate polymers conforming to ASTM 1315, Type 1, Class A.
Compound shall be VOC compliant material to render the surface with a glossy appearance
resistant to dirt and moisture penetration. All exposed aggregate floors shall receive two coats
of the following or approved equal:
1. TK Products - Bright Kure & Seal.
2. The Euclid Chemical Company - Super Diamond Clear.
3. Vexcon Chemicals - Vexcon Starseal 1315.
4. Degussa Construction Chemicals - Kure-N-Seal 25LV.
5. W.R. Meadows - Epoxo-Gloss.
H. Waterstop: shall be a flexible strip of Bentonite waterproofing compound American Colloid
Company - Volclay Waterstop RX or approved equal. Provide primer and adhesive as required
by the manufacturer.
2.06 BONDING AND JOINTING PRODUCTS
A. BOND BREAKER: at juncture of interior concrete slabs and adjacent walls shall be 15 lb. felt
with adhesive on one side.
B. Expansion Joint Filler: shall be an asphalt, vegetable fibers and mineral filler joint formed under
heat and pressure between two asphalt felt liners conforming to ASTM D994. It shall be
resistant to oil, solvents, ozone and weathering. Joint Filler shall be as manufactured by W.R.
Meadows, Inc. - Sealtight Asphalt Expansion Joint Filler.
C. Sealant and Primer: As specified in Section 07 90 05.
2.07 CONCRETE MIX DESIGN
A. Proportioning Normal Weight Concrete: Comply with ACI 211.1 recommendations.
B. Furnish the following types of concrete:
1. Footings - 1" aggregate, 4000 psi, non-air entrained.
2. Foundations - 1" aggregate, 4000 psi, non-air entrained.
3. Slabs - 1" aggregate, 4000 psi, non-air entrained, water reducing admixture to produce a
water to cement ratio of 0.45..
4. Exterior Concrete - 1" aggregate, 4500 psi, air entrained.
C. Admixtures: Add acceptable admixtures as recommended in ACI 211.1 and at rates
recommended or required by manufacturer.
D. Fiber Reinforcement: Add to mix at rate of 1 pound per cubic yard.
2.08 MIXING
A. Transit Mixers: Comply with ASTM C94/C94M.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify lines, levels, and dimensions before proceeding with work of this section.
3.02 PREPARATION
A. Coordinate placement of embedded items with erection of concrete formwork and placement of
form accessories.
B. Where new concrete is to be bonded to previously placed concrete, prepare existing surface by
cleaning with steel brush and applying bonding agent in accordance with manufacturer's
instructions.
25170 Brule Public Works
Garage
03 30 00 - 5 CAST-IN-PLACE CONCRETE
C. Install vapor retarder under interior slabs on grade, as shown on drawings. Lap joints minimum
12 inches and seal watertight by taping edges and ends. All penetrations of the vapor retarder
shall be sealed. Any stakes driven through the vapor retarder shall be sealed.
3.03 PLACING UNDERSLAB VAPOR BARRIER
A. Install materials in accordance with manufacturer's instructions.
B. Level and compact granular base as required.
C. Unroll vapor retarder with the longest dimension of the pour and pull out the folds to the full
width of the product.
D. Lap vapor retarder onto the foundation wall to the height of the concrete slab and seal with two
sided tape.
E. Seal around all pipe penetrations with pipe boots or material and tape as per manufacturer's
instructions. Seal around all other penetrations with an elastomeric sealant to create a
monolithic membrane between the surface of the slab and moisture sources below and at the
slab perimeter as per manufacturer's instructions.
F. Holes or punctures through the vapor retarder shall be sealed with a patch and seaming tape
prior to pouring concrete.
G. Protection: When installing reinforcing steel and utilities in addition to the placement of
concrete, take precautions to protect the vapor retarder. Provide additional protection in high
traffic areas.
H. Use only brick-type reinforcing bar supports to protect the membrane from puncture.
I. Avoid driving stakes through the vapor retarder. If this cannot be avoided, each individual hole
must be repaired.
3.04 PLACING CONCRETE
A. Place concrete in accordance with ACI 304R.
B. Place concrete for floor slabs in accordance with ACI 302.1R.
C. Notify Architect not less than 24 hours prior to commencement of placement operations.
D. Ensure reinforcement, inserts, embedded parts, and formed construction joint devices will not
be disturbed during concrete placement.
E. Finish floors level and flat, unless otherwise indicated, within the tolerances specified below.
3.05 SLAB JOINTING
A. Locate joints as indicated on the drawings.
B. Anchor joint fillers and devices to prevent movement during concrete placement.
C. Isolation Joints: Use preformed joint filler with removable top section for joint sealant, total
height equal to thickness of slab, set flush with top of slab.
D. Separate slabs from vertical surfaces with bond breaker.
E. Install joint devices in accordance with manufacturer's instructions.
F. Apply sealants in joint devices in accordance with Section 07 9005.
G. Maintain records of concrete placement. Record date, location, quantity, air temperature, and
test samples taken.
3.06 FLOOR FLATNESS AND LEVELNESS TOLERANCES
A. Minimum F(F) Floor Flatness and F(L) Floor Levelness Values:
1. Exposed to View and Foot Traffic: F(F) of 20; F(L) of 15, on-grade only.
2. Under Carpeting: F(F) of 25; F(L) of 20, on-grade only.
3. Under Thin Resilient Flooring and Thinset Tile: F(F) of 35; F(L) of 25, on-grade only.
a. Coordinate with tolerance acceptance of specified products in section 09 30 00 as
required.
25170 Brule Public Works
Garage
03 30 00 - 6 CAST-IN-PLACE CONCRETE
B. Measure F(F) and F(L) in accordance with ASTM E1155, within 48 hours after slab installation;
report both composite overall values and local values for each measured section.
C. Correct the slab surface if composite overall value is less than specified and if local value is
less than two-thirds of specified value or less than F(F) 13/F(L) 10.
D. Correct defects by grinding or by removal and replacement of the defective work. Areas
requiring corrective work will be identified. Re-measure corrected areas by the same process.
3.07 CONCRETE FINISHING
A. Repair surface defects, including tie holes, immediately after removing formwork.
B. Unexposed Form Finish: Rub down or chip off fins or other raised areas 1/4 inch or more in
height.
C. Exposed Form Finish: Rub down or chip off and smooth fins or other raised areas 1/4 inch or
more in height. Provide finish as follows:
1. Smooth Rubbed Finish: Wet concrete and rub with carborundum brick or other abrasive,
not more than 24 hours after form removal.
D. Concrete Slabs: Finish to requirements of ACI 302.1R, and as follows:
1. Surfaces to Receive Thin Floor Coverings: "Steel trowel" as described in ACI 302.1R; thin
floor coverings include carpeting, resilient flooring, seamless flooring, thin set quarry tile,
and thin set ceramic tile.
2. Other Surfaces to Be Left Exposed: Trowel as described in ACI 302.1R, minimizing
burnish marks and other appearance defects.
E. In areas with floor drains, maintain floor elevation at walls; pitch surfaces uniformly to drains at
1:100 nominal.
3.08 CURING AND PROTECTION
A. Comply with requirements of ACI 308R. Immediately after placement, protect concrete from
premature drying, excessively hot or cold temperatures, and mechanical injury.
B. Maintain concrete with minimal moisture loss at relatively constant temperature for period
necessary for hydration of cement and hardening of concrete.
1. Normal concrete: Not less than 7 days.
C. Formed Surfaces: Cure by moist curing with forms in place for full curing period.
D. Surfaces Not in Contact with Forms:
1. Curing/Sealing New Concrete:
a. Apply in accordance with manufacturer's instructions.
b. Apply immediately after surface water has dissipated, and concrete can withstand
weight.
c. Apply at a rate of 200 - 300 square feet per gallon for the first and second coats using
spray brush or roller.
d. Avoid buildup which can cause slippery conditions or lifting action between coats.
Protect from freezing Do not apply if concrete surface and ambient temperatures are
below 40 degrees F.
3.09 FIELD QUALITY CONTROL
A. An independent testing agency will perform field quality control tests, as specified in Section 01
40 00 - Quality Requirements.
B. Provide free access to concrete operations at project site and cooperate with appointed firm.
C. Submit proposed mix design of each class of concrete to inspection and testing firm for review
prior to commencement of concrete operations.
D. Tests of concrete and concrete materials may be performed at any time to ensure conformance
with specified requirements.
E. Compressive Strength Tests: ASTM C39/C39M. For each test, mold and cure three concrete
test cylinders. Obtain test samples for every 50 cu yd or less of each class of concrete placed.
25170 Brule Public Works
Garage
03 30 00 - 7 CAST-IN-PLACE CONCRETE
F. Take one additional test cylinder during cold weather concreting, cured on job site under same
conditions as concrete it represents.
G. Perform one slump test for each set of test cylinders taken, following procedures of ASTM
C143/C143M.
H. Slab Moisture Content: Test concrete slabs on grade in accordance with ASTM F2170 - 02,
Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in situ
Probes. Flooring materials shall not be installed over floors with a relative humidity greater than
80%.
I. Tested concrete reports need to be coordinated with respective parties and shall be distributed
to all associated parties including: Testing firm, Owner, CM or GC, Sub-contractor, and
supplier.
END OF SECTION
25170 Brule Public Works Garage 05 40 00 - 1 COLD-FORMED METAL FRAMING
SECTION 05 40 00
COLD-FORMED METAL FRAMING
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Formed steel stud wall framing.
1.02 RELATED REQUIREMENTS
A. Section 06 10 00 - Rough Carpentry: Wood blocking and miscellaneous framing.
B. Section 07 21 00 - Thermal Insulation: Insulation within framing members.
C. Section 07 25 00 - Weather Barriers: Weather barrier over sheathing.
1.03 REFERENCE STANDARDS
A. AISI SG02-1 - North American Specification for the Design of Cold-Formed Steel Structural
Members; American Iron and Steel Institute; 2001 with 2004 supplement. (replaced SG-971)
B. ASTM A153/A153M - Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel
Hardware; 2023.
C. ASTM A 123/A 123M - Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron
and Steel Products; 2000.
D. ASTM A653/A653M - Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-
Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process; 2023.
E. ASTM A1003/1003M - Standard Specification for Steel Sheet, Carbon, Metallic and Nonmetallic
Coated for Cold Formed Framing Members.
F. ASTM C955 - Standard Specification for Load-Bearing (Transverse and Axial) Steel Studs,
Runners (Tracks), and Bracing or Bridging for Screw Application of Gypsum Panel Products
and Metal Plaster Bases; 2011c.
G. ASTM C 1007 - Standard Specification for Installation of Load Bearing (Transverse and Axial)
Steel Studs and Related Accessories; 2020.
H. ASTM C1177/C1177M - Standard Specification for Glass Mat Gypsum Substrate for Use as
Sheathing; 2017.
I. AWS D1.1/D1.1M - Structural Welding Code - Steel; American Welding Society; Current
edition.
J. SSPC-Paint 20 - Zinc-Rich Primers (Type I, "Inorganic," and Type II, "Organic"); Society for
Protective Coatings; 2019.
1.04 SUBMITTALS
A. See Section 01 30 00 - Administrative Requirements, for submittal procedures.
B. Product Data: Provide data on standard framing members; describe materials and finish,
product criteria, limitations and installation instructions.
C. Shop Drawings: Provide shop drawings prepared by cold-formed metal framing manufacturer.
Indicate component details, framed openings, and accessories or items required of related
work.
1. Indicate stud and floor joist layout.
2. Describe method for securing studs to tracks and for bolted framing connections.
3. Provide design engineer's stamp on shop drawings.
4. Provide details and calculations for factory-made framing connectors, stamped by a
Professional Structural Engineer.
D. Manufacturer's Installation Instructions: Indicate special procedures, conditions requiring
special attention.
25170 Brule Public Works Garage 05 40 00 - 2 COLD-FORMED METAL FRAMING
1.05 QUALITY ASSURANCE
A. Designer Qualifications: Design framing system under direct supervision of a Professional
Structural Engineer experienced in design of this Work and licensed in the State in which the
Project is located.
B. Calculate structural properties of framing members in accordance with requirements of AISI
North American Specification for the Design of Cold-Formed Steel Structural Members.
PART 2 PRODUCTS
2.01 MANUFACTURERS
A. Metal Framing:
1. Clarkwestern Dietrich Building Systems LLC: www.clarkdietrich.com.
2. MiTek Industries, Inc: www.mii.com.
3. Aegis Metal Framing: www.aegismetalframing.com.
B. Framing Connectors and Accessories:
2.02 FRAMING SYSTEM
A. Provide primary and secondary framing members, bridging, bracing, plates, gussets, clips,
fittings, reinforcement, and fastenings as required to provide a complete framing system.
B. Design Criteria: Provide completed framing system having the following characteristics:
1. Design: Calculate structural characteristics of cold-formed steel framing members
according to AISI North American Specification for the Design of Cold-Formed Steel
Structural Members.
2. Structural Performance: Design, engineer, fabricate, and erect to withstand specified
design loads for project conditions within required limits.
3. Design Loads: In accordance with applicable codes.
4. Live load deflection meeting the following, unless otherwise indicated:
a. Exterior Walls: Maximum horizontal deflection under wind load of applicability.
1. L/600 (or L/720) for masonry/stone veneers.
2. L/360 for metal panels and other siding materials.
b. Design non-axial loadbearing framing to accommodate not less than 1/2 in vertical
deflection.
5. Able to tolerate movement of components without damage, failure of joint seals, undue
stress on fasteners, or other detrimental effects when subject to seasonal or cyclic
day/night temperature ranges.
6. Able to accommodate construction tolerances, deflection of building structural members,
and clearances of intended openings.
C. Metal Framing Connectors and Accessories:
1. Dietrich Metal Framing: www.dietrichindustries.com.
2. The Steel Network Inc: www.SteelNetwork.com.
3. Substitutions: See Section 01 60 00 - Product Requirements.
2.03 FRAMING MATERIALS
A. Studs and Track: ASTM A653/653M-07; studs formed to channel shape with punched web; U-
shaped track in matching nominal width and compatible height. All stud and tracks shall be 18
gauge minimum with a minimum yield stress Fy of 33 KSI.
1. Gage and depth: As indicated on the drawings.
2. Galvanized in accordance with ASTM A653/A653M G60/Z180 coating.
B. Framing Connectors: Factory-made formed steel sheet, ASTM A1003/1003M SS Grade 50,
with G90/Z275 hot dipped galvanized coating and factory punched holes.
1. Material: ASTM A653/A653M SS Grade 33 and 40 (minimum), with G90/Z275 hot dipped
galvanized coating for thicknesses less than 10 gage (0.118 inch), and factory punched
holes and slots.
25170 Brule Public Works Garage 05 40 00 - 3 COLD-FORMED METAL FRAMING
2. Structural Performance: Maintain load and movement capacity required by applicable
code, when evaluated in accordance with AISI North American Specification for the
Design of Cold Formed Steel Structural Members.
3. Movement Connections: Provide mechanical anchorage devices that accommodate
movement using slotted holes, shouldered screws or screws and anti-friction or stepped
bushings, while maintaining structural performance of framing. Provide movement
connections where indicated on drawings.
a. Where top of stud wall terminates below structural floor or roof, connect studs to
structure in manner allowing vertical and horizontal movement of slab without
affecting studs; allow for minimum movement of 1/2 inch.
b. Acceptable Products: VertiClip(r) or DriftClip(tm) manufactured by The Steel Network
Inc.
c. Rated Wall locations shall utilize Blazeframe Riptrak or approved equal.
4. Fixed Connections: Provide non-movement connections for tie-down to foundation, floor-
to-floor tie-down, roof-to-wall tie-down, joist hangers, gusset plates, and stiffeners.
2.04 ACCESSORIES
A. Bracing, Furring, Bridging: Formed sheet steel, thickness determined for conditions
encountered; finish to match framing components.
B. Touch-Up Primer for Galvanized Surfaces: SSPC-Paint 20, Type I - Inorganic, complying with
VOC limitations of authorities having jurisdiction.
2.05 FASTENERS
A. Self-Drilling, Self-Tapping Screws, Bolts, Nuts and Washers: Hot dip galvanized per ASTM
A153/A153M.
B. Anchorage Devices: Powder actuated.
C. Anchorage Devices: Power actuated.
D. Welding: In conformance with AWS D1.1.
2.06 SHOP FABRICATED ASSEMBLIES
A. Fabricate assemblies of framed sections of sizes and profiles required; with framing members
fitted, reinforced, and braced to suit design requirements.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that substrate surfaces are ready to receive work.
3.02 INSTALLATION OF STUDS
A. Install components in accordance with AISI's Standard Cold Formed Steel Framing - General
Provisions. Comply with manufacturers' instructions unless more stringent requirements are
indicated.
B. Align floor and ceiling tracks; locate to wall layout. Secure in place with fasteners at maximum
16 inches on center.
C. Construct corners using minimum of three studs. Install double studs at wall openings, door and
window jambs.
D. Install load bearing studs full length in one piece. Splicing of studs is not permitted.
E. Install load bearing studs, brace, and reinforce to develop full strength and achieve design
requirements.
F. Coordinate placement of insulation in multiple stud spaces made inaccessible after erection.
G. Install framing between studs for attachment of mechanical and electrical items, and to prevent
stud rotation.
25170 Brule Public Works Garage 05 40 00 - 4 COLD-FORMED METAL FRAMING
H. Install batt insulation in areas that will be inaccessible after framing is installed, before studs are
placed in their final position.
END OF SECTION
25170 Brule Public Works
Garage
05 50 00 - 1 METAL FABRICATIONS
SECTION 05 50 00
METAL FABRICATIONS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Shop fabricated steel items.
1.02 RELATED REQUIREMENTS
A. Section 03 30 00 - Cast-in-Place Concrete: Placement of metal fabrications in concrete.
B. Section 09 90 00 - Painting and Coatings: Field painting.
1.03 REFERENCE STANDARDS
A. ANSI A14.3 - American National Standard for Ladders -- Fixed -- Safety Requirements.
B. ASTM A36/A36M - Standard Specification for Carbon Structural Steel; 2019.
C. ASTM A53/A53M - Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated,
Welded and Seamless; 2022.
D. ASTM A123/A123M - Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and
Steel Products; 2017.
E. ASTM A283/A283M - Standard Specification for Low and Intermediate Tensile Strength Carbon
Steel Plates; 2018.
F. ASTM A325 - Standard Specification for Structural Bolts, Steel, Heat Treated, 120/105 ksi
Minimum Tensile Strength; 2014.
G. ASTM A325M - Standard Specification for Structural Bolts, Steel, Heat Treated 830 MPa
Minimum Tensile Strength (Metric); 2014.
H. ASTM A500/A500M - Standard Specification for Cold-Formed Welded and Seamless Carbon
Steel Structural Tubing in Rounds and Shapes; 2023.
I. ASTM A501/A501M - Standard Specification for Hot-Formed Welded and Seamless Carbon
Steel Structural Tubing; 2021.
J. ASTM B209M - Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate
[Metric]; 2021a.
K. ASTM B221 - Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods,
Wire, Profiles, and Tubes; 2021.
L. AWS A2.4 - Standard Symbols for Welding, Brazing, and Nondestructive Examination; 2020.
M. AWS D1.1/D1.1M - Structural Welding Code - Steel; 2025.
N. SSPC-Paint 15 - Steel Joist Shop Primer/Metal Building Primer; 2004.
O. SSPC-Paint 20 - Zinc-Rich Primers (Type I, "Inorganic," and Type II, "Organic"); 2019.
P. SSPC-SP 2 - Hand Tool Cleaning; 2024.
1.04 SUBMITTALS
A. See Section 01 30 00 - Administrative Requirements, for submittal procedures.
B. Shop Drawings: Indicate profiles, sizes, connection attachments, reinforcing, anchorage, size
and type of fasteners, and accessories. Include erection drawings, elevations, and details where
applicable.
1. Indicate welded connections using standard AWS A2.4 welding symbols. Indicate net weld
lengths.
C. Welders' Certificates: Submit certification for welders employed on the project, verifying AWS
qualification within the previous 12 months.
25170 Brule Public Works
Garage
05 50 00 - 2 METAL FABRICATIONS
PART 2 PRODUCTS
2.01 MATERIALS - STEEL
A. Steel Sections: ASTM A36/A36M.
B. Steel Tubing: ASTM A501/A501M hot-formed structural tubing.
C. Plates: ASTM A283.
D. Pipe: ASTM A53/A53M, Grade B Schedule 40, black finish.
E. Bolts, Nuts, and Washers: ASTM A325 (ASTM A325M), Type 1, plain.
F. Welding Materials: AWS D1.1/D1.1M; type required for materials being welded.
G. Shop and Touch-Up Primer: SSPC-Paint 15, complying with VOC limitations of authorities
having jurisdiction.
H. Touch-Up Primer for Galvanized Surfaces: SSPC-Paint 20, Type I - Inorganic, complying with
VOC limitations of authorities having jurisdiction.
2.02 FABRICATION
A. Fit and shop assemble items in largest practical sections, for delivery to site.
B. Fabricate items with joints tightly fitted and secured.
C. Grind exposed joints flush and smooth with adjacent finish surface. Make exposed joints butt
tight, flush, and hairline. Ease exposed edges to small uniform radius.
D. Supply components required for anchorage of fabrications. Fabricate anchors and related
components of same material and finish as fabrication, except where specifically noted otherwise.
2.03 FABRICATED ITEMS
A. Ledge Angles, Shelf Angles, Channels, and Plates Not Attached to Structural Framing: For
support, and as required, etc. as shown on drawings; prime paint finish. See drawings.
B. Bollards: Schedule 40 Steel Pipe, concrete filled, crowned cap, as detailed; prime paint finish.
1. Bollard Covers: Provide colored covers with two lines of reflective tape, sized as required to
fit over pipe bollards. Bollard covers shall be as manufactured by Innoplast; phone 800-516-
9287;
www.innoplast.com or approved equal. Provide standard color selections.
2.04 FINISHES - STEEL
A. Prime paint steel items.
1. Exceptions: Do not prime surfaces in direct contact with concrete, and where field welding
is required.
B. Prime Painting: One coat.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that field conditions are acceptable and are ready to receive work.
3.02 PREPARATION
A. Clean and strip primed steel items to bare metal where site welding is required.
B. Supply setting templates to the appropriate entities for steel items required to be cast into
concrete or embedded in masonry.
3.03 INSTALLATION
A. Install items plumb and level, accurately fitted, free from distortion or defects.
B. Provide for erection loads, and for sufficient temporary bracing to maintain true alignment until
completion of erection and installation of permanent attachments.
C. Field weld components as indicated on drawings.
D. Perform field welding in accordance with AWS D1.1/D1.1M.
25170 Brule Public Works
Garage
05 50 00 - 3 METAL FABRICATIONS
E. Obtain approval prior to site cutting or making adjustments not scheduled.
F. After erection, prime welds, abrasions, and surfaces not shop primed or galvanized, except
surfaces to be in contact with concrete.
3.04 TOLERANCES
A. Maximum Variation From Plumb: 1/4 inch per story, non-cumulative.
B. Maximum Offset From True Alignment: 1/4 inch.
C. Maximum Out-of-Position: 1/4 inch.
END OF SECTION
25170 Brule Public Works Garage 06 10 00 - 1 ROUGH CARPENTRY
SECTION 06 10 00
ROUGH CARPENTRY
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Preservative treated wood materials.
B. Miscellaneous framing and sheathing.
C. Communications and electrical room mounting boards.
D. Wood nailers.
E. Concealed wood blocking for support of wall mounted accessories, etc.
1.02 RELATED REQUIREMENTS
A. Section 09 21 16 Gypsum Board Assemblies: Related.
1.03 REFERENCE STANDARDS
A. AFPA (WFCM) - Wood Frame Construction Manual for One- and Two-Family Dwellings;
American Forest and Paper Association; 2012.
B. ASTM A153/A153M - Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel
Hardware; 2023.
C. ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building Materials;
2024.
D. AWPA U1 - Use Category System: User Specification for Treated Wood; American Wood
Protection Association; 2025.
E. PS 1 - Structural Plywood; 2023.
F. PS 20 - American Softwood Lumber Standard; National Institute of Standards and Technology
(Department of Commerce); 2025.
G. WWPA G-5 - Western Lumber Grading Rules; Western Wood Products Association; 2025.
H. International Building Code and the State of Minnesota Building Code.
1.04 SUBMITTALS
A. See Section 01 30 00 - Administrative Requirements, for submittal procedures.
B. Product Data: Provide technical data on wood preservative materials and fire treated materials.
1.05 QUALITY ASSURANCE
A. Lumber: Comply with PS 20 and approved grading rules and inspection agencies.
1.06 DELIVERY, STORAGE, AND HANDLING
A. General: Cover wood products to protect against moisture. Support stacked products to prevent
deformation and to allow air circulation.
PART 2 PRODUCTS
2.01 GENERAL REQUIREMENTS
A. Dimension Lumber: Comply with PS 20 and requirements of specified grading agencies.
1. If no species is specified, provide any species graded by the agency specified; if no
grading agency is specified, provide lumber graded by any grading agency meeting the
specified requirements.
2. Grading Agency: Any grading agency whose rules are approved by the Board of Review,
American Lumber Standard Committee (www.alsc.org) and who provides grading service
for the species and grade specified; provide lumber stamped with grade mark unless
otherwise indicated.
B. Lumber fabricated from old growth timber is not permitted.
25170 Brule Public Works Garage 06 10 00 - 2 ROUGH CARPENTRY
2.02 DIMENSION LUMBER FOR CONCEALED APPLICATIONS
A. Grading Agency: Western Wood Products Association (WWPA).
B. Sizes: Nominal sizes as indicated on drawings, S4S.
C. Moisture Content: S-dry or MC19.
D. Dimensional Lumber for framing (2x4 and 2x6):
1. Species: Spruce, Pine, Fir.
2. Grade: No. 2 or better, with minimum design values as shown on drawings.
E. Dimensional Lumber (2x8, 2x10, 2x12):
1. Species: Douglas Fir or Southern Yellow Pine
2. Grade: No. 2, with minimum design values as shown on drawings.
F. Miscellaneous Framing, Blocking, Nailers, Grounds, and Furring:
1. Lumber: S4S, No. 2 or Standard Grade.
2. Boards: Standard or No. 3.
2.03 CONSTRUCTION PANELS
A. Subfloor/Underlayment Combination: APA PRP-108, Rated Sturd-I-Floor.
1. Exposure Class: Exterior.
2. Span Rating: 24 inches (610 mm).
3. Thickness: 3/4 inches (19 mm), nominal.
B. Plywood Wall and Roof Sheathing: PS 1, Grade C-D, Exposure I, thickness as shown on
drawings. At the Contractors option Oriented Strand Board of similar thickness and rating as
the plywood sheathing may be used in lieu fo plywood sheathing.
C. Communications and Electrical Room Mounting Boards: PS 1 A-D plywood, or medium density
fiberboard; 3/4 inch (19 mm) thick; flame spread index of 25 or less, smoke developed index of
450 or less, when tested in accordance with ASTM E84.
D. Other Applications:
1. Other Locations: PS 1, C-D Plugged or better.
2.04 ACCESSORIES
A. Fasteners and Anchors:
1. Metal and Finish: Hot-dipped galvanized steel per ASTM A 153/A 153M for high humidity
and preservative-treated wood locations, unfinished steel elsewhere.
B. Subfloor Glue: APA AFG-01, Waterproof, water base, air cure type, cartridge dispensed.
2.05 FACTORY WOOD TREATMENT
A. Treated Lumber and Plywood: Comply with requirements of AWPA U1 - Use Category System
for wood treatments determined by use categories, expected service conditions, and specific
applications.
1. Preservative-Treated Wood: Provide lumber and plywood marked or stamped by an
ALSC-accredited testing agency, certifying level and type of treatment in accordance with
AWPA standards.
B. Fire Retardant Treatment: AWPA Treatment C27 for plywood, Interior Type A Low Temperature
(low hygroscopic), chemical treatment pressure impregnated; capable of providing a maximum
flame spread/smoke development rating of 25 or less / 25 or less. Provide Dricon manufactured
by Hickson Corporation or approved equal.
C. Preservative Pressure Treatment of Lumber Above Grade: AWPA U1, Use Category UC3B,
Commodity Specification A using waterborne preservative to 0.25 lb/cu ft (4.0 kg/cu m)
retention.
1. Kiln dry lumber after treatment to maximum moisture content of 19 percent.
2. Treat lumber in contact with roofing, flashing, or waterproofing.
3. Treat lumber in contact with masonry or concrete.
4. Treat lumber less than 18 inches (450 mm) above grade.
25170 Brule Public Works Garage 06 10 00 - 3 ROUGH CARPENTRY
5. Preservative Pressure Treatment of Plywood Above Grade: AWPA U1, Use Category
UC2 and UC3B, Commodity Specification F using waterborne preservative to 0.25 lb/cu ft
(4.0 kg/cu m) retention.
a. Kiln dry plywood after treatment to maximum moisture content of 19 percent.
b. Treat plywood in contact with roofing, flashing, or waterproofing.
c. Treat plywood in contact with masonry or concrete.
d. Treat plywood less than 18 inches (450 mm) above grade.
D. Preservative Pressure Treatment of Lumber in Contact with Soil: AWPA U1, Use Category
UC4A, Commodity Specification A using waterborne preservative to 0.4 lb/cu ft (6.4 kg/cu m)
retention.
E. Preservative Pressure Treatment of Critical Structural Members in Contact with Soil: AWPA
Use Category UC6A, Commodity Specification A (Treatment C2) using waterborne preservative
to 0.6 lb/cu ft retention.
PART 3 EXECUTION
3.01 PREPARATION
A. Coordinate installation of rough carpentry members specified in other sections.
3.02 INSTALLATION - GENERAL
A. Select material sizes to minimize waste.
B. Reuse scrap to the greatest extent possible; clearly separate scrap for use on site as accessory
components, including: shims, bracing, and blocking.
C. Where treated wood is used on interior, provide temporary ventilation during and immediately
after installation sufficient to remove indoor air contaminants.
3.03 FRAMING INSTALLATION
A. Set structural members level, plumb, and true to line. Discard pieces with defects that would
lower required strength or result in unacceptable appearance of exposed members.
B. Make provisions for temporary construction loads, and provide temporary bracing sufficient to
maintain structure in true alignment and safe condition until completion of erection and
installation of permanent bracing.
C. Install structural members full length without splices unless otherwise specifically detailed.
D. Comply with member sizes, spacing, and configurations indicated, and fastener size and
spacing indicated, but not less than required by applicable codes and AFPA Wood Frame
Construction Manual.
E. Construct double joist headers at floor and ceiling openings and under wall stud partitions that
are parallel to floor joists; use metal joist hangers unless otherwise detailed.
F. Frame wall openings with two or more studs at each jamb; support headers on cripple studs.
3.04 BLOCKING, NAILERS, AND SUPPORTS
A. Provide framing and blocking members as indicated or as required to support finishes, fixtures,
specialty items, and trim.
3.05 INSTALLATION OF ACCESSORIES AND MISCELLANEOUS WOOD
A. Place full width continuous sill flashings under framed walls on cementitious foundations. Lap
flashing joints 4 inches (100 mm) and seal.
B. Install soffit vents in locations shown on drawings as per manufacturer's instructions. Butt
sections end to end to form a continuous vent.
C. All finished work shall be scribed and coped as required for an accurate fit and erected plumb,
true square and in accordance with the drawings. Correlate location of nailers, blocking
grounds and similar supports to allow proper attachment or other work. All work shall be
secured in place with screws or nails as required. Countersink and fill all nail and screw heads
exposed to view.
25170 Brule Public Works Garage 06 10 00 - 4 ROUGH CARPENTRY
D. This Contractor shall furnish and install all nails, spikes, screws, bolts and other similar items of
rough hardware required in the progress of his work and shall install all items of finish hardware
furnished by others.
E. As finish hardware is delivered, this Contractor shall check all items against approved hardware
listing and assume full responsibility for same until completion of building. He shall inspect the
work of other trades which are to receive hardware and report in writing any defects found in
same before installing. Installation of any hardware by this contractor shall imply his acceptance
of the work of others.
3.06 INSTALLATION OF CONSTRUCTION PANELS
A. Subflooring/Underlayment Combination: Glue and nail to framing; staples are not permitted.
1. Install flooring with long dimension perpendicular to supports with panels continuous over
two or more spans.
2. Stagger panel end joints between courses. All panel joints shall occur over framing.
3. Allow 1/8 inch spacing at panel end and edge joints.
4. Glue panels to framing members with a continuous line of glue on the joists and a
continuous line of glue in the panel grooves.
5. Nail panels with 10d ring shank nails 6 inches on center at panel edges and 10 inches on
center at intermediate supports.
B. Wall Sheathing: Secure with long dimension parallel to wall studs, with ends over firm bearing
using nails. Stagger vertical joints at least one stud space. Allow 1/8" spacing at panel ends
and edges. Attach APA rated wall sheathing to framing members with 6d common nails spaced
6" on center at the edges and 12" on center at intermediate supports.
C. Roof Sheathing: Install APA rated roof sheathing with long dimension at right angles to framing
members. Stagger end joints at each alternate course. Allow 1/8" spacing at panel ends and
edges. Attach APA rated roof sheathing to decking members with 8d common nails spaced 4"
on center at the edges, 6" on center at supports, and 12" on center throughout the field of the
panel.
D. Communications and Electrical Room Mounting Boards: Secure with screws to studs with
edges over firm bearing; space fasteners at maximum 24 inches (610 mm) on center on all
edges and into studs in field of board.
1. At fire-rated walls, install board over wall board indicated as part of the fire-rated
assembly.
2. Where boards are indicated as full floor-to-ceiling height, install with long edge of board
parallel to studs.
3. Install adjacent boards without gaps.
END OF SECTION
25170 Brule Public Works
Garage
06 20 00 - 1 FINISH CARPENTRY
SECTION 06 20 00
FINISH CARPENTRY
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Finish carpentry items.
1.02 RELATED REQUIREMENTS
A. Section 05 50 00 - Metal Fabrications
B. Section 06 10 00 - Rough Carpentry: Support framing, grounds, and concealed blocking.
C. Section 06 41 00 - Architectural Wood Casework: Related work.
1.03 REFERENCE STANDARDS
A. AWI (QCP) - Quality Certification Program, www.awiqcp.org; current edition at
www.awiqcp.org.
B. AWI/AWMAC/WI (AWS) - Architectural Woodwork Standards.
C. AWI/AWMAC (QSI) - Architectural Woodwork Quality Standards Illustrated; Architectural
Woodwork Institute and Architectural Woodwork Manufacturers Association of Canada, 8th Ed.,
Version 2.0.
D. NHLA G-101 - Rules for the Measurement & Inspection of Hardwood & Cypress; National
Hardwood Lumber Association.
E. WI (MAN) - Manual of Millwork; Woodwork Institute.
1.04 SUBMITTALS
A. See Section 01 30 00 - Administrative Requirements for submittal procedures.
B. Shop Drawings: Indicate materials, component profiles, fastening methods, jointing details, and
accessories, to a minimum scale of 1-1/2 inch to 1 ft.
C. Samples: Submit two samples of wood trim 6 inches long.
D. Samples: Submit two samples of Tackboard Fabric for selection by the Architect. Colors will be
selected from manufacturer's standard line of colors.
1.05 QUALITY ASSURANCE
A. Perform work in accordance with Woodwork Institute Manual of Millwork, grades as indicated.
B. Grade materials in accordance with the following:
1. Softwood Lumber: In accordance with rules certified by ALSC; www.alsc.org.
2. Plywood: Certified by the American Plywood Association.
3. Hardwood Lumber: In accordance with NHLA Grading Rules; www.natlhardwood.org.
C. Fabricator Qualifications: Company specializing in fabricating the products specified in this
section with minimum five years of documented experience.
D. Fabricator Qualifications: Company specializing in fabricating the products specified in this
section with minimum three years of documented experience.
1.06 DELIVERY, STORAGE, AND HANDLING
A. Protect work from moisture damage.
1.07 PROJECT CONDITIONS
A. Do not deliver materials to the site until all masonry, drywall and tile work has been completed
and has had sufficient time to dry.
B. Do not deliver materials to the site until the permanent heating system is installed and running
so as to maintain a minimum temperature of 60 degrees.
C. Materials shall be delivered to the site at least seven days in advance of installation and stored
in the rooms they will be installed in and allowed to acclimate to the site
25170 Brule Public Works
Garage
06 20 00 - 2 FINISH CARPENTRY
PART 2 PRODUCTS
2.01 FINISH CARPENTRY ITEMS
A. Quality Grade: Unless otherwise indicated provide products of quality specified by
AWI/AWMAC/WI (AWS) for Premium Grade. Design intent is to match that of existing
conditions/systems.
2.02 WOOD-BASED COMPONENTS
A. Wood fabricated from old growth timber is not permitted.
2.03 LUMBER MATERIALS
A. Hardwood Lumber: Maple species, Plain sawn, Grade I, maximum moisture content of 6
percent; with vertical grain, of quality suitable for transparent finish.
1. Trim/mold pieces including but not limited to: chair rail, areas indicated on drawings.
2.04 ADHESIVE
A. Adhesive: Type recommended by laminate manufacturer to suit application.
2.05 FASTENINGS
A. Fasteners: Of size and type to suit application; finish in concealed locations and finish in
exposed locations.
B. Concealed Joint Fasteners: Threaded steel, or hardwood biscuits.
C. Furnish "Z" type clips for fastening paneling to walls.
2.06 ACCESSORIES
A. Lumber for Shimming, Blocking, and furring: Softwood lumber of Birch species.
B. Wood Filler: Solvent base, tinted to match surface finish color.
2.07 HARDWARE
A. Shelf Standards: Decorative Heavy Duty double slotted standards, 1-1/16 inch wide x 11/16
inch deep by length as shown on drawings. Shelf standards shall be KV - KV0082 color as
selected.
B. Shelf Brackets: double slotted Knife style, Powder Coated finish; KV0182 Bracket
manufactured by KV. Bracket length shall be as required for shelving size as shown on
drawings.
2.08 FABRICATION
A. All paneling, casework, benches, display cases, etc. shall be fabricated in accordance with
Architectural Woodwork Standards 1st edition. Coordinate glass items with Section 08 80 00.
B. Shop assemble work for delivery to site, permitting passage through building openings.
C. When necessary to cut and fit on site, provide materials with ample allowance for cutting.
Provide trim for scribing and site cutting.
D. Door frames for all doors shall be fabricated to AWI Quality Standards Section 9, Custom
Grade.
E. Paneling: All paneling on walls and on furniture items with edges exposed with a reveal shall
have a 1/8 inch hardwood edging of the same species applied.
F. Veneered Wood Paneling: Provide "Z" type fastening clips for hanging panels in place.
2.09 SHOP FINISHING - INTERIOR MOLDINGS, TRIM AND PANELING
A. Apply wood filler in exposed nail and screw indentations.
B. On items to receive transparent finishes, use wood filler that matches surrounding surfaces and
is of type recommended for the applicable finish.
C. Finish work in accordance with Woodwork Institute Manual of Millwork, Section 5, System #12
Waterbased Polyurethane.
25170 Brule Public Works
Garage
06 20 00 - 3 FINISH CARPENTRY
D. Back prime woodwork items to be field finished, prior to installation.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify adequacy of backing and support framing.
B. See Section 06100 for installation of recessed wood blocking.
3.02 INSTALLATION
A. Install work in accordance with AWI/AWMAC/WI (AWS) requirements for grade indicated.
B. Set and secure materials and components in place, plumb and level.
C. Carefully scribe work abutting other components, with maximum gaps of 1/32 inch. Do not use
additional overlay trim to conceal larger gaps.
D. All finished work shall be scribed and coped as required for an accurate fit and erected plumb,
true, square and in accordance with the drawings. Correlate location of nailers, blocking
grounds and similar supports to allow proper attachment or other work. All work shall be
secured in place with screws or nails as required. Countersink and fill all nail and screw heads
exposed to view.
E. This Contractor shall furnish and install all nails, spikes, screws, bolts and other similar items of
rough hardware required in the progress of his work and shall install all items of finish hardware
furnished by others.
F. Install moldings to the following standards:
1. Moldings to receive transparent finish shall be selected for compatibility of grain and color.
2. No warped or twisted molding shall be allowed.
3. All moldings to be set plumb, level and true.
4. Moldings and trim shall be installed in maximum lengths possible to minimize joints.
5. All field joints to be tightly fitted and flush.
6. Field joints in running trim to be diagonal ("scarfed") joints.
7. Exposed ends of running trim shall have profiled or self-mitered returns.
8. All exposed fastenings (nails or trim head screws) shall be deep set.
9. Miters on large members (4" or larger) shall be doweled or splined and glued.
10. Blind nailing and concealed type fasteners to be used whenever possible.
11. Cope or miter inside corners where applicable, to produce tight fitting joints.
12. Miter outside joints to produce tight fitting joints.
G. Install paneling pieces level and plumb in locations shown on drawings. Paneling shall be hung
from "Z" clips or by other approved method with reveals as shown on drawings. Provide plastic
laminate faced panels.
H. Install shelving standards and brackets as shown on drawings, level and plumb.
I. Install hardware in accordance with manufacturer's instructions.
3.03 TOLERANCES
A. Maximum Variation from True Position: 1/16 inch.
B. Maximum Offset from True Alignment with Abutting Materials: 1/32 inch.
END OF SECTION
25170 Brule Public Works
Garage
06 41 00 - 1 ARCHITECTURAL WOOD
CASEWORK
SECTION 06 41 00
ARCHITECTURAL WOOD CASEWORK
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Cabinet units
B. Countertops
1.02 RELATED REQUIREMENTS
A. Section 06 10 00 - Rough Carpentry: Support framing, grounds, and concealed blocking.
1.03 REFERENCE STANDARDS
A. AWI/AWMAC/WI (AWS) - Architectural Woodwork Standards; 2014 (with Errata 2016).
B. AWI/AWMAC (QSI) - Architectural Woodwork Quality Standards Illustrated; Architectural
Woodwork Institute and Architectural Woodwork Manufacturers Association of Canada; 2005,
8th Ed., Version 2.0.
C. BHMA A156.9 - American National Standard for Cabinet Hardware; Builders Hardware
Manufacturers Association; 2020 (ANSI/BHMA A156.9).
D. GSA CID A-A-1936 - Adhesive, Contact, Neoprene Rubber; Federal Specifications and
Standards; Revision A, 1996 (validated 2013).
E. HPVA HP-1 - American National Standard for Hardwood and Decorative Plywood; Hardwood
Plywood & Veneer Association; 2024 (ANSI/HPVA HP-1).
1.04 ADMINISTRATIVE REQUIREMENTS
A. Pre-installation Meeting: Convene a pre-installation meeting not less than one week before
starting work of this section; require attendance by all affected installers.
1.05 SUBMITTALS
A. See Section 01 30 00 - Administrative Requirements, for submittal procedures.
B. Shop Drawings: Indicate materials, component profiles and elevations, assembly methods, joint
details, fastening methods, accessory listings, hardware location and schedule of finishes.
C. Product Data: Provide data for hardware accessories.
1.06 QUALITY ASSURANCE
A. Fabricator Qualifications: Company specializing in fabricating the products specified in this
section with minimum five years of documented experience.
B. Perform work in accordance with AWI/AWMAC Architectural Woodwork Quality Standards
Illustrated, Custom quality, unless other quality is indicated for specific items.
1.07 DELIVERY, STORAGE, AND HANDLING
A. Protect units from moisture damage.
1.08 FIELD CONDITIONS
A. During and after installation of custom cabinets, maintain temperature and humidity conditions
in building spaces at same levels planned for occupancy.
PART 2 PRODUCTS
2.01 WOOD-BASED COMPONENTS
A. Wood fabricated from old growth timber is not permitted.
2.02 CABINETS
A. Quality Grade: Unless otherwise indicated provide products of quality specified by
AWI//AWMAC/WI Architectural Woodwork Standards (AWS) for Premium Grade.
B. Plastic Laminate Faced Cabinets: Custom grade.
25170 Brule Public Works
Garage
06 41 00 - 2 ARCHITECTURAL WOOD
CASEWORK
C. Cabinets:
1. Finish - Exposed Exterior Surfaces: Decorative laminate.
2. Finish - Exposed Interior Surfaces: Decorative laminate.
3. Finish - Concealed Surfaces: Laminate backing sheet.
4. Door and Drawer Front Edge Profiles: Square edge with thin applied band.
5. Casework Construction Type: Type A - Frameless.
6. Adjustable Shelf Loading: 50 lbs. per sq. ft.
a. Deflection: L/144.
7. Cabinet Style: Flush overlay.
8. Cabinet Doors and Drawer Fronts: Flush style.
9. Drawer Side Construction: Manufacturer's option.
10. Drawer Construction Technique: As recommended by fabricator.
D. Fabrication:
1. Finish - Exposed Exterior Surfaces:
a. Standard
2. Finish - Exposed Interior Surfaces:
a. Standard laminate.
3. Finish - Concealed Surfaces: Laminate backing sheet.
4. Casework Construction Type: Type A - Frameless.
5. Cabinet Doors and Drawer Fronts:
a. Flush overlay style, square edge profile,3/4 inch thick with 1mm thin applied
band.
6. Adjustable Shelf Loading: 50 lbs. per sq. ft.
a. Deflection: L/144.
7. Drawer Sides, back and sub front Construction: Minimum ¾ thick particleboard,
laminated with thermally fused melamine doweled and glued into sides. Top edge banded
w/ 1mm PVC
8. Assembly: Shop assemble cabinets for delivery to site in units easily handled and to
permit passage through building openings.
9. All casework shall conform to the standards of the Architectural Woodworking Institute -
Section 10 Casework, Custom Grade, Flush Overlay Design. All body members and tops
shall be thickness as shown on the drawings or as specified herein, medium density
fiberboard or plywood covered on the exposed side with decorative plastic laminate and
unexposed side with laminate backing sheet. Wood veneer shall be glued to the particle
board under pressure.
10. Edging: Fit shelves, doors, and exposed edges with specified edging. Do not use more
than one piece for any single length.
11. Mechanically fasten back splash to countertops as recommended by laminate
manufacturer at 16 inches on center.
12. Apply laminate backing sheet to reverse side of plastic laminate finished surfaces.
13. Provide cutouts for plumbing fixtures. Verify locations of cutouts from on-site dimensions.
Prime paint cut edges.
E. Hardware: BHMA A156.9, types as indicated for quality grade specified.
1. Shelf Brackets: 1/8" diameter steel pins that fit into predrilled holes in the cabinet sides.
Pins to have a flattened exposed surface to support the shelf.
2. Drawer and Door Pulls: Commercial grade standard.
3. Cabinet Locks:
a. Keyed cylinder, two keys per lock, master keyed, steel with chrome finish.
c. Locations as indicated on drawings
4. Catches: Magnetic.
5. Drawer Slides:
a. Type: Full extension.
b. Static Load Capacity: Commercial grade.
c. Mounting: Side mounted.
25170 Brule Public Works
Garage
06 41 00 - 3 ARCHITECTURAL WOOD
CASEWORK
d. Stops: Integral type.
e. Features: Provide self-closing/soft close type.
6. Hinges: Commercial grade standard.
7. Stainless steel sink enclosure: ADA Stainless steel enclosure Type 304, #4 finish, Inter
Dyne Systems, Part ADSE-24 or approved equal.
8. Plumbing Shields: ADA shields Wall mounted shield concealment to hide plumbing
piping under tops, size to accommodate, Trueform Concrete or approved equal.
2.03 PANEL MATERIALS
A. Medium Density Fiberboard (MDF): ANSI A208.2; type as specified in AWI/AWMAC
Architectural Woodwork Quality Standards Illustrated; composed of wood fibers pressure
bonded with moisture resistant adhesive to suit application; sanded faces; thickness as
required.
B. Particleboard: ANSI A208.1; type as specified in AWI/AWMAC Architectural Woodwork Quality
Standards Illustrated, composed of wood chips, medium density, made with moisture resistant;
of grade to suit application; sanded faces.
2.04 LAMINATE MATERIALS
A. Manufacturers:
1. Formica Corporation: www.formica.com.
2. Panolam Industries International, Inc\Nevamar: www.nevamar.com.
3. Wilsonart International, Inc: www.wilsonart.com.
4. Substitutions: See Section 01 60 00 - Product Requirements.
B. Plastic Laminate: In accordance with AWI Quality Standards Illustrated, 0.048 inch General
Purpose quality; color, pattern, and gloss surface texture as selected.
1. Standard custom flush overlay spec
2. 3mm PVC edge banding on door and drawer edges
3. Concealed Hinges
4. Standard wire pulls
5. Display cabinets: Glass inserts in doors
C. High Pressure Decorative Laminate (HPDL): NEMA LD 3, types as recommended for specific
applications and as follows:
1. Horizontal Surfaces: HGS, 0.048 inch nominal thickness, through color, colors as
scheduled, finish as scheduled.
2. Vertical Surfaces: VGS, 0.028 inch nominal thickness, through color, colors as scheduled,
finish as scheduled.
3. Post-Formed Horizontal Surfaces: HGP, 0.039 inch nominal thickness, through color,
colors as scheduled, finish as scheduled.
4. Flame Retardant Surfaces: HGF, 0.048 inch nominal thickness, through color, colors as
scheduled, finish as scheduled.
5. Cabinet Liner: CLS, 0.020 inch nominal thickness, through color, colors as scheduled,
finish as scheduled.
6. Laminate Backer: BKL, 0.020 inch nominal thickness, undecorated; for application to
concealed backside of panels faced with high pressure decorative laminate.
2.05 COUNTERTOPS
A. Plastic Laminate: locations as indicated on drawings.
1. 3mm PVC edge banding on edges.
2. Backsplashes and sidesplashes.
B. Solid Laminated Surfacing: Economy quality hardwood; As selected by architect, plain sawn,
exposed edge grain; laminated with waterproof adhesives; thickness as recommended by
fabricator; suitable for transparent finish.
1. Solid Surface: locations as indicated on drawings.
a. Backsplashes and sidesplashes as indicated.
b. At vanities: solid surface aprons, pipe shield.
25170 Brule Public Works
Garage
06 41 00 - 4 ARCHITECTURAL WOOD
CASEWORK
c. Window sills as indicated on drawings.
C Countertops shall be fabricated to the size and configuration shown on drawings.
D. Materials
1. Solid Surface Material (SSM)
a. Standard.
E. Edge Style: Square, eased edges
F. Back & Side Splash: Set-on style
G. Accessories
1. Adhesive:
a. Type as recommended by manufacturer.
2. Joint Sealer
a. Type as recommended by manufacturer.
3. Metal support concealed brackets: Rakks, EH-1818FM Surface Mount Countertop Support
Bracket. Color: TBD
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify adequacy of backing and support framing.
B. Verify location and sizes of utility rough-in associated with work of this section.
C. Field verify dimensions on site prior to fabrication
3.02 INSTALLATION
A. Cabinets
1. Set and secure custom cabinets in place, assuring that they are rigid, plumb, and level.
2. Use concealed joint fasteners to align and secure adjoining cabinet units.
3. Carefully scribe casework abutting other components, with maximum gaps of 1/32 inch.
Do not use additional overlay trim for this purpose.
B. Countertops
1. Install countertops level, plumb, true, and straight. Shim as required with concealed shims.
Install level and plumb to a tolerance of 1/8 inch in 96 inches.
2. Field Jointing: Where possible make in the same manner as shop jointing, using dowels,
splines, adhesives, and fasteners recommended by manufacturer. Prepare edges to be
joined in shop so Project-site processing of top and edge surfaces is not required. Locate
field joints where shown on Shop Drawings. secure field joints with concealed clamping
devices located within 6 inches of front and back edges and at intervals not exceeding 24
inches.
3. Provide cutouts for appliances, plumbing fixtures, electrical work, and similar items.
4. Anchor countertops securely to cabinets or other support framing.
5. Install countertops with no more than 1/8 inch in 96-inch sag, bow, or other variation from a
straight line.
6. Secure backsplashes to wall with adhesive.
7. Seal junctures of tops, splashes, and walls with mildew-resistant silicone sealant or another
permanently elastic sealing compound recommended by countertop material manufacturer.
8. Polish exposed undersurfaces of counters to match top finish.
9. Install enclosures and shields are required. See drawings, coordinate with Mechanical.
3.03 ADJUSTING
A. Adjust installed work.
B. Adjust moving or operating parts to function smoothly and correctly.
C. Adjust joints to provide uniform surface appearance.
D. Repair or replace damaged work which cannot be repaired to architects satisfaction.
25170 Brule Public Works
Garage
06 41 00 - 5 ARCHITECTURAL WOOD
CASEWORK
3.04 CLEANING
A. Clean casework, counters, window stools, shelves, hardware, fittings, and fixtures.
END OF SECTION
25170 Brule Public Works
Garage
06 82 13 - 1 FIBERGLASS REINFORCED
WALL PANELS
SECTION 06 82 13
FIBERGLASS REINFORCED WALL PANELS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Sanitary Wall Panels (FRP).
1.02 RELATED SECTIONS
A. Section 09 21 16 - Gypsum Board Assemblies.
1.03 SUBMITTALS
A. See Section 01 30 00 - Administrative Requirements, for submittal procedures.
B. Product Data: Provide manufacturer's literature and installation instructions.
C. Samples: Submit samples for color selection.
1.04 QUALITY ASSURANCE
A. Manufacturer Qualifications: Company specializing in manufacturing products specified in this
section, with not less than three years of documented experience.
B. Installer Qualifications: Company specializing in performing the work of this section with
minimum 3 years of experience.
1.05 PRE-INSTALLATION MEETING
A. Convene one week before starting work of this section.
PART 2 PRODUCTS
2.01 MANUFACTURERS
A. Kemlite Company - Fire-X Glasbord
B. Nudo Products Company - Fiber-Lite LP-F9-FR.
C. Crane Standard selection
D. Substitutions: See Section 01 60 00 - Product Requirements.
2.02 MATERIALS
A. Sanitary Wall Panels shall be a fiberglass reinforced plastic panel with a Class A Surface
Burning Characteristic as per ASTM E84. Panels shall be .09 inches thick with an embossed
surface finish. Color as selected by Architect from manufacturer's standard line of colors.
B. See Interior Finish Material Schedule, Architectural drawings.
2.03 ACCESSORIES
A. Furnish edge trim that matches the panel color as required for a complete installation.
PART 3 EXECUTION
3.01 EXAMINATION
A. Examine surfaces to which panels will be applied to determine that corners are plumb and
straight, surfaces are clean and smooth. Fasteners shall be countersunk, joints and cracks
filled and smooth with the adjoining surface.
B. Do not begin installation until backup surfaces are put into satisfactory condition.
3.02 INSTALLATION
A. Install in accordance with manufacturer's instructions.
B. Do all cutting with carbide tipped saw blades or drill bits, or with snips.
C. Install panels with manufacturer's recommended gap at panel joints.
25170 Brule Public Works
Garage
06 82 13 - 2 FIBERGLASS REINFORCED
WALL PANELS
D. Clean any adhesive or excessive sealant from panel face using solvent or cleaner as
recommended by the panel manufacturer.
END OF SECTION
25170 Brule Public Works
Garage
07 11 13 - 1 BITUMINOUS DAMPPROOFING
SECTION 07 11 13
BITUMINOUS DAMPPROOFING
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Bituminous dampproofing.
1.02 RELATED REQUIREMENTS
A. Section 07 21 00 - Board Insulation: Rigid insulation board used as protection board.
B. Section 31 23 23 - Fill.
1.03 REFERENCE STANDARDS
A. ASTM D41/D41M - Standard Specification for Asphalt Primer Used in Roofing, Dampproofing,
and Waterproofing; 2011 (Reapproved 2023).
1.04 SUBMITTALS
A. See Section 01 30 00 - Administrative Requirements, for submittal procedures.
B. Product Data: Provide properties of primer, bitumen, and mastics.
C. Manufacturer's Installation Instructions: Indicate special procedures and perimeter conditions
requiring special attention.
1.05 FIELD CONDITIONS
A. Maintain ambient temperatures above 40 degrees F for 24 hours before and during application
until dampproofing has cured.
PART 2 PRODUCTS
2.01 DAMPPROOFING PRODUCTS
A. W.R. Meadows; Product Sealmastic Type I Spray Grade, Emulsion Type.
B. Other Acceptable Manufacturers:
1. Karnak Chemical Corp - #100AF Non-Fibrated Emulsion Coating www.karnakcorp.com.
2. Henry Company - 788 Premium Foundation Coating.
3. Substitutions: See Section 01 60 00 - Product Requirements.
2.02 COLD ASPHALTIC MATERIALS
A. Asphalt Primer: ASTM D41/D41M, compatible with substrate.
B. Spray-On Bitumen: Emulsified asphalt, ASTM D1187 Type I, and ASTM D1227, Type III Class
1 unreinforced (Type III).
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify existing conditions before starting work.
B. Verify substrate surfaces are durable, free of matter detrimental to adhesion or application of
dampproofing system.
C. Verify that items that penetrate surfaces to receive dampproofing are securely installed.
3.02 PREPARATION
A. Protect adjacent surfaces not designated to receive dampproofing.
B. Clean and prepare surfaces to receive dampproofing in accordance with manufacturer's
instructions.
C. Do not apply dampproofing to surfaces unacceptable to manufacturer.
D. Apply mastic to seal penetrations, small cracks, or minor honeycomb in substrate.
E. Fill voids, cracks and holes in concrete or masonry with cement mortar and allow to dry.
25170 Brule Public Works
Garage
07 11 13 - 2 BITUMINOUS DAMPPROOFING
3.03 APPLICATION
A. Prime surfaces in accordance with manufacturer's instructions and allow to dry prior to
application of dampproofing.
B. Apply bitumen by spray application.
C. Apply bitumen in one coat, continuous and uniform, at a rate of 2-3 gallons per 100 square feet.
D. Apply from 2 inches below finish grade elevation down to top of footings, including footing.
E. Seal items projecting through dampproofing surface with mastic. Seal watertight.
F. Coating shall be continuous and free of pinholes or holidays. Cover all slots, joints and grooves
and apply into all chases and corners.
G. Allow coating to dry minimum of 48 hours prior to backfilling.
H. Place insulation protection board as specified in Section 07 21 00 directly over dampproofing
prior to backfilling.
3.04 SCHEDULE
A. Foundation Wall at areas with no below grade occupancy. One coating of asphalt
dampproofing.
END OF SECTION
25170 Brule Public Works
Garage
07 21 00 - 1 THERMAL INSULATION
SECTION 07 21 00
THERMAL INSULATION
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Board insulation at areas as required or as shown on drawings.
B. Batt insulation as required or as shown on drawings.
1.02 RELATED REQUIREMENTS
A. Section 07 25 00 - Weather Barriers: Separate air barrier and vapor retarder materials.
B. Section 07 84 00 - Firestopping: Insulation as part of fire-rated through-penetration assemblies.
1.03 REFERENCE STANDARDS
A. ASTM C578 - Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation; 2023.
B. ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building Materials;
2024.
1.04 SUBMITTALS
A. See Section 01 30 00 - Administrative Requirements, for submittal procedures.
B. Product Data: Provide data on product characteristics, performance criteria, and product
limitations.
C. Manufacturer's Installation Inst
Text truncated. Open the original for the full document.