_08112026-1365
City of Superior · Douglas County · meeting of Aug 11, 2026 · Minutes
Open the original document More from City of Superior
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
WISCONSIN POINT COMMITTEE – 8/11/26 Meeting (Meets as needed/quarterly.)
*Attended the meeting virtually Page 1 of 5
WISCONSIN POINT COMMITTEE Minutes
Tuesday, August 11, 2026 Regular Meeting
The meeting was called to order by Chair Bridge at 4:30 p.m. on August 11, 2026, in
Government Center Room 204 & virtually via Microsoft Teams.
1. ROLL CALL
Members Present: Tom Bridge, Lee Sandok Baker, Nick Danz, Matt Steiger, Mike Herrick,
Deanna Erickson, Cherie Hagen*
City Staff Present: Bridgit Maruska, Kara Czapinski, Cameron Vollbrecht
Others Present: Shelley Nelson
2. APPROVAL OF MINUTES
The committee decided to speak on item 4.1, allowing Fire Chief Vollbrecht sufficient
time to provide his update.
2.1 Wisconsin Point Committee (Meeting held May 12, 2026)
MOTION by Sandok Baker second by Danz and carried to approve the Wisconsin
Point Committee Minutes from May 12, 2026.
Cameron Vollbrecht left the meeting at 4:35 p.m.
Deanna Erickson joined the meeting at 4:35 p.m.
3. NEW BUSINESS
3.1. Election of Officers
3.1.1 Election of Chair
MOTION by Herrick, second by and Danz carried to nominate Tom Bridge as
Chair.
3.1.2 Election of Vice-Chair
MOTION by Bridge, second by and Sandok Baker carried to nominate Mike
Herrick as Vice-Chair.
3.2. Update on Allouez Bay
Cherie Hagen detailed the activities of phase one, which includes winter 2024
construction involving channeling, pooling, and the mechanical removal of cattails,
followed by native seeding and the establishment of habitat mounds and muskrat den
replicas. An evaluation in 2025 will assess site conditions and the regrowth of cattails
WISCONSIN POINT COMMITTEE – 8/11/26 Meeting (Meets as needed/quarterly.)
*Attended the meeting virtually Page 2 of 5
attributed to low water levels. The team is actively working to manage invasive species
such as cattails and purple loosestrife through repeated mechanical cutting and the
introduction of beetles for biological control. They are also considering alternative
mechanical methods like grinding and mowing, particularly near water edges.
Monitoring of vegetation and bird populations will persist into 2026, alongside
continued mechanical control of cattails and potential pilot burns, with hand cutting
employed in sensitive areas to evaluate the effectiveness of various mechanical
strategies.
3.3. Discussion on Allouez Bay Alternative 3
Hagen indicated that while progress on the alternatives has been limited, significant
advancements are being made, particularly regarding alternative 3. A collaboration with
a team of coastal engineers from the U.S. Army Corps of Engineers has led to the
development of models for existing wave energy and circulation patterns. This
partnership includes a specialized team focused on identifying potential features and
configurations that could enhance wave protection in the area. The Army Corps is
preparing a technical memorandum that will detail the modeling outcomes, various
alternatives considered, and the elevations of the proposed features. The analysis
includes scenarios where features are submerged under normal water conditions versus
those that are above water during average conditions, with the aim of determining the
most effective configuration to safeguard the back bay against extreme events and rising
water levels. Additionally, the discussion touched on the conditions in the back bays,
particularly where Bluff Creek meets other lobes, highlighting the successful manoomin
restoration efforts in that region.
Matt Steiger indicated that approximately 16 acres were sown with 3,100 pounds of wild
rice, yielding favorable outcomes in areas that had previously shown little productivity.
Additionally, beetle releases were implemented to manage invasive species. However, it
was noted that the active promotion of wild rice harvesting is constrained by the limited
size of the restoration sites. Experienced harvesters are familiar with the specific
conditions of these sites, leading outreach efforts to concentrate on restoration rather
than advocating for extensive harvesting. The discussion also covered the technical
elements of rice harvesting, highlighting the advantages of substrate disturbance.
Furthermore, the permitting requirements for residents of Wisconsin were outlined, and
the potential for a rice camping competition was introduced, although further details are
still forthcoming.
3.4. Discussion on Wisconsin Point 50 Project
Director Maruska is in the process of evaluating the potential for Wisconsin to either
collaborate with or join the MP50 initiative, with upcoming meetings scheduled with
representatives from MP50. The focus of these discussions is to assess the advantages
and logistical considerations of collaboration compared to pursuing independent efforts.
In a related update, Deanna Erickson reported on the progress of the resiliency study for
Wisconsin Point, noting that delays have arisen due to issues with data availability,
necessitating grant extensions. The study, which is being conducted by AMI, has faced
setbacks linked to the late delivery of data from the Army Corps' Section 111 study. A
WISCONSIN POINT COMMITTEE – 8/11/26 Meeting (Meets as needed/quarterly.)
*Attended the meeting virtually Page 3 of 5
request for a grant extension has been made, along with the allocation of additional
funds to support ongoing sediment transport modeling. Once the necessary data is
obtained, the project will advance to the development of alternatives, incorporating input
from both the core team and the community. While the study will not yield a complete
design, it is expected to offer significant recommendations for future management
strategies.
4. OLD BUSINESS
4.1. Update on the Fire Management Plan
Fire Chief Vollbrecht announced that the team has secured the Fish Wildlife Grant to
facilitate planning and burning activities at Wisconsin Point, with formal confirmation
anticipated from Fish and Wildlife Services on September 1st. This grant will also
supply equipment for the Fond du Lac group, enabling them to continue their work
throughout the winter. The team is contemplating a fall burn; however, they are facing
challenges due to exceptionally dry conditions that could lead to an early fire season,
potentially limiting burning for safety reasons. They are closely monitoring the situation
to ensure that any burns are conducted safely within designated patrol zones.
The Chief also discussed mechanical thinning in areas too dense for burning,
highlighting the removal of a large red pine affected by insects and fire. The salvaged
wood from this tree will be utilized for displays and shelving in the public area of the
new station. Additionally, the involvement of Rhodes Scholars from UWS in
educational tours about the site's history and restoration efforts was noted, with the tours
receiving positive feedback, save for one negative comment. Post-burn monitoring
indicated minimal tree loss, with birch trees not only surviving but thriving, while the
reduction of intermediate brush has allowed more sunlight to reach the ground. Ongoing
plant community surveys are expected to yield further valuable insights.
4.2. Update on Schafers Beach
Director Maruska stated that the Switchback Trail project is set to commence in late
September, with the goal of finishing before winter. This initiative aims to enhance both
accessibility and surface conditions for beach access.
4.3. Update on 44th Avenue East Dock
Director Maruska has extended an invitation to a community design workshop
scheduled for August 24th at 44th Avenue East dock., organized by the Alliance, where
preliminary designs will be showcased by Stantec. Accommodations will be available
for attendees.
WISCONSIN POINT COMMITTEE – 8/11/26 Meeting (Meets as needed/quarterly.)
*Attended the meeting virtually Page 4 of 5
4.4. Update on Update on Wisconsin Point Cultural Connection Project
Director Maruska announced that an RFQ for the Cultural Connection project is set to be
issued within three weeks, accompanied by stakeholder engagement to gather design
input. The project will incorporate conceptual designs for the boardwalk, while full
designs will be developed for interpretive signage and additional components.
4.5. Discussion on funding and timeline for the Wisconsin Point Management Plan
Currently, there are no updates available.
5. RECURRING BUSINESS
5.1 Committee Member/Partner Updates
Deanna Erickson –
Fond du Lac has submitted a grant to the Army Corps, which, upon approval expected by
November, will facilitate restoration activities within the Corps' holdings. The process of
transferring Fond du Lac land into federal trust is also approaching completion, pending a
final signature following a public comment period. This transition will exempt the tribe
from tax obligations and reinforce their claim to the land. Additionally, due to concerns
regarding funding and maintenance, the initial design for the Roundhouse has been
modified to a simpler sitting area with a fire pit, although there remains potential for
future structural enhancements if funding permits.
Matt Steiger –
Recent findings indicate that wild rice samples collected from the St. Louis River Estuary
exhibited no absorption of harmful toxins, with the data currently undergoing evaluation
by public health and pollution control authorities. Funding for the analysis of PFAS has
been obtained, and the processing of samples is underway. It was also noted that the
funding for sample collection and analysis originated from separate grants allocated in
different years, and there are ongoing discussions aimed at enhancing coordination and
data sharing among the agencies involved.
Director Maruska –
It was observed that although there is currently no regulation prohibiting the burning of
pallets or construction wood, the website has been revised to advise against this practice.
The group deliberated on the hazards posed by nails and glass in fire pits and
contemplated whether these items could be categorized as waste according to existing
regulations. The team reached a consensus to streamline and enhance signage to raise
public awareness and discussed the possibility of collaborating with law enforcement to
ensure more effective enforcement, while also acknowledging the necessity for policy
revisions to specifically address these materials.
WISCONSIN POINT COMMITTEE – 8/11/26 Meeting (Meets as needed/quarterly.)
*Attended the meeting virtually Page 5 of 5
5.2 Future Agenda Items
5.2.1 Update on Fire Management Plan
5.2.2 Update on Schafers Beach
5.2.3 Update on 44th Avenue East Dock
5.2.4 Update on Cultural Connection Project
5.3 Confirm the next meeting date as November 10, 2026, at 4:30 p.m. in Room 204 of
the Government Center.
6. ADJOURNMENT
Chair Bridge announced the meeting adjourned at 5:32 p.m.