PUBLIC WORKS COMMITTEE – 7/08/26 Meeting Page 1 of 1
PUBLIC WORKS COMMITTEE
Wednesday, July 8, 2026 – 5:00 p.m.
Government Center, Room 204
Virtual Meeting Link
Meeting ID: 283 789 294 331 548
Passcode: vx9YK6q9
Call in Option: +1 (872) 242-8028
Phone Conference ID: 315 752 723#
MISSION STATEMENT:“To serve as an advisory to the Superior Common Council, Departments of the City of Superior and
the citizens of the City of Superior in matters of public concern under Wisconsin State Statute 62.14 and City Code 2-311.”
COMMITTEE MEMBERS: Nick Ledin, Garner Moffat, Tylor Elm, Joe Radtke (alt.)
1. ROLL CALL
2. APPROVAL OF MINUTES
2.1. Public Works Committee (Meeting held June 4, 2026)
3. OLD BUSINESS
3.1. Discussion and recommendation of a report submitted by Raftelis Financial Consultants
evaluating the acquisition of utilities operated by Superior, Water, Light & Power.
3.1.1. Recommendation of referendum and public meeting schedules.
4. NEW BUSINESS
4.1. Recommendation to approve an Amendment to the city’s Electrical Services Contract with
Benson Electric Company.
4.2. Recommendation to modify City of Superior Ordinance 34-73 to expand the City’s Delegated
Authority for Commercial Plan Review.
4.3. Recommendation to award a contract with Redline Plan Review for performance of Commercial
Plan Review.
4.4. Discussion on City of Superior Ordinance 114-62(e) Hauled Waste Charges.
5. RECURRING BUSINESS
5.1 ESD Director’s Update
5.2 Director’s Update
5.3 Future Agenda Items
5.4 Confirm the next meeting date as August 6, 2026, at 5:00 p.m. in Room 204 of the Government
Center.
6 ADJOURNMENT
Notice is hereby given that a majority of the members of the Common Council may be present at the meeting, and although this may
constitute a quorum of the Common Council, the Council will not take any action at this meeting.
*********************************************************************************************
Pursuant to the Americans with Disabilities Act of 1990, if you are in need of an accommodation to participate in the public meeting process, please call (715)
395-7200 by 4:30 p.m. on the day prior to the scheduled meeting date (OR dial 711 for Telecommun ications Relay Service). The City will attempt to accommodate
any request depending on the amount of notice received.
*********************************************************************************************
In compliance with Wisconsin Open Meetings Law, this agenda was posted on 7/02/2026 at the following locations: Superior Government Center, Superior
Public Library, and online at https://www.superior.wi.us/agendacenter. It was also emailed the Superior Telegram.
PUBLIC WORKS COMMITTEE – 6/04/2026 Meeting (Meets monthly on 1st Thursday at 5 p.m.) Page 1 of 5
*Attended virtually
PUBLIC WORKS COMMITTEE MINUTES
June 4, 2026 Regular Meeting
The meeting was called to order by Councilor Ledin at 5:00 p.m. on June 4, 2026, in Government
Center Room 204.
COMMITTEE MEMBERS: Nick Ledin, Garner Moffat, Tylor Elm, Joe Radtke (alt.)
1. ROLL CALL
Members Present: Nick Ledin, Garner Moffat, Tylor Elm, Joe Radtke
City Staff Present: Chris Carlson, Kara Czapinski, Jim Paine, Steve Roberts,
Dave Pollock, Jon Shamla
Others Present: Shelley Nelson, Paul Eberth, Dean Will, Bob Steede,
Dan Hinzmann
2. APPROVAL OF MINUTES
2.1. Public Works Committee (Meeting held May 7, 2026)
MOTION by Elm, second by Moffat and carried to approve the minutes from May 7,
2026.
3. OLD BUSINESS
3.1. Discussion of a report submitted by Raftelis Financial Consultants evaluating the acquisition
of utilities operated by Superior, Water, Light & Power.
Mayor Paine announced initiatives to enhance public engagement and foster informed
discussions regarding the utility acquisition. Plans include multiple town hall meetings at
various locations and times, with a minimum of five sessions scheduled and a commitment
to provide two weeks' notice for each. A survey related to the acquisition was distributed
with utility bills; however, to address concerns about confidentiality and public records
laws, a third-party provider will be utilized to ensure respondent privacy and encourage
honest feedback. The Mayor also emphasized the necessity of allowing sufficient time for
the committee and City Council to review the Raftelis report, mentioning that Raftelis is
prepared to serve as an expert witness if the acquisition results in litigation, with potential
discussions taking place in closed sessions due to expected legal challenges.
3.2. Recommendation to approve Chapter 58, Article IV Recyclable Waste Materials Ordinance
revisions.
City Clerk Blunt identified changes in the ordinance that were not adequately highlighted
during its approval at the recent Public Works Committee meeting. This update aims to
correct and clarify all relevant information within the ordinance to ensure its accuracy.
MOTION by Elm, second by Moffat and carried to approve Chapter 58, Article IV
Recyclable Waste Materials Ordinance revisions.
PUBLIC WORKS COMMITTEE – 6/04/2026 Meeting (Meets monthly on 1st Thursday at 5 p.m.) Page 2 of 5
*Attended virtually
4. NEW BUSINESS
4.1. Submittal of the 2025 Compliance Maintenance Annual Report (CMAR).
Jon Shamla reported that the City’s 2025 wastewater treatment performance is encapsulated
in the CMAR, which covers aspects such as planning, financial status, staffing, and
maintenance. Notably, there were no permit violations or errors, leading to a commendable
score of 4.0 from the Wisconsin Department of Natural Resources. Shamla has
recommended that the CMAR be presented to the City Council for approval at the upcoming
meeting, ensuring adherence to the Wisconsin Department of Natural Resources submission
deadline of June 30th.
MOTION by Elm, second by Moffat and carried to approve the 2025 Compliance
Maintenance Annual Report (CMAR).
4.2. Recommendation of contract award to Sipsas Excavating for the 2026 South Superior Storm
Sewer Project in the amount of $576,096.90.
Dave Pollock indicated that the project entails the separation of combined inlets from the
sanitary sewer at two sites in South Superior. This initiative aims to remove approximately
10 acres of drainage from the sanitary system, thereby reducing the burden on the treatment
plant.
MOTION by Elm, second by Moffat and carried to approve the contract award to
Sipsas Excavating for the 2026 South Superior Storm Sewer Project in the amount of
$576,096.90.
4.3. Recommendation to award engineering services to SEH for the CSTP 5 Facility
Improvements Design project in an amount of $450,000.00.
The CSTP 5 project encompasses plans to elevate and reconstruct the building, implement
new treatment processes including UV disinfection and solar power, and ensure alignment
with forthcoming agreements from Enbridge.
MOTION by Elm, second by Moffat and carried to award engineering services to SEH
for the CSTP 5 Facility Improvements Design project in an amount of $450,000.00.
4.4. Recommendation to award engineering services to SEH for the CSTP 6 Facility
Improvements Design project in an amount of $419,000.00.
MOTION by Elm, second by Moffat and carried to engineering services to SEH for the
CSTP 6 Facility Improvements Design project in an amount of $419,000.00.
PUBLIC WORKS COMMITTEE – 6/04/2026 Meeting (Meets monthly on 1st Thursday at 5 p.m.) Page 3 of 5
*Attended virtually
4.5. Recommendation to award the Facilities Planning for PFOS and PFOA Project to Donohue
and Associates at a proposed amount of $434,445.00.
Director Roberts emphasized the importance of facility planning for the treatment of PFAS
and PFOA. This initiative aims to prepare the city to take advantage of new funding
opportunities while also addressing upcoming regulatory requirements. Key components of
this strategy include the development of pollutant minimization plans and targeted treatment
approaches.
MOTION by Elm, second by Moffat and carried to award the Facilities Planning for
PFOS and PFOA Project to Donohue and Associates at a proposed amount of
$434,445.00.
4.6. Recommendation to proceed with the Landfill Leachate PFAS Treatment Pilot Project with
Xylem in an amount not anticipated to exceed $182,500.00.
Director Roberts announced the implementation of advanced PFAS destruction technology
at the landfill, focusing on landfill leachate as a significant contributor to PFAS
contamination in the wastewater system. The initiative aims to assess the effectiveness of
treating this leachate stream prior to its entry into the main treatment facility.
MOTION by Elm, second by Moffat and carried to proceed with the Landfill Leachate
PFAS Treatment Pilot Project with Xylem in an amount not to exceed $182,500.00.
4.7. Recommendation to approve a resolution authorizing submission of a Boating Infrastructure
Grant (BIG) application for replacement of the transient dock at Barker’s Island Marina.
Director Carlson announced that the city is seeking a 75/25 split grant of up to $1.5 million
to replace the deteriorating transient dock at Barker's Island Marina. The resolution
authorizing this application does not commit the city to proceed without further approval
from the council if the grant is awarded. Discussions highlighted the possibility of adding
more and longer slips to accommodate larger vessels, the dock's significance in generating
revenue for the Marina, and the necessity for future design and funding considerations.
MOTION by Elm, second by Moffat and carried to approve a resolution authorizing
submission of a Boating Infrastructure Grant (BIG) application for replacement of the
transient dock at Barker’s Island Marina.
4.8. Recommendation to approve the Wastewater Connection Cooperative Agreement with
Enbridge Energy.
Mayor Paine announced that Enbridge has approached the city regarding a terminal upgrade
that will implement a non-contact cooling system utilizing city water to cool oil pipelines.
This process will produce heated, yet uncontaminated, wastewater that requires treatment
before being discharged. Currently, the city does not have the capacity to handle the
additional wastewater without risking permit violations. To address this, the agreement
stipulates that Enbridge will invest $1.1 million in system improvements, including UV
PUBLIC WORKS COMMITTEE – 6/04/2026 Meeting (Meets monthly on 1st Thursday at 5 p.m.) Page 4 of 5
*Attended virtually
disinfection, to enhance capacity and prevent untreated discharges during overflow events.
This initiative is anticipated to generate substantial new revenue for the city through
wastewater fees and increased terminal tax revenue, with a projected payback period of six
to seven years, while also improving water quality by minimizing untreated discharges into
local waterways.
During discussions, committee members and Enbridge representatives examined various
technical aspects, such as pipeline integrity, temperature control, and measures to prevent oil
contamination in the wastewater system. The project will incorporate multiple monitoring
systems and emergency shutoff mechanisms to ensure safety. Scheduled for completion by
late 2027 or early 2028, the project will proceed through phased construction and permitting
processes, allowing the city to maintain flexibility in implementing the necessary capacity
improvements.
MOTION by Elm, second by Moffat and carried to approve the Wastewater
Connection Cooperative Agreement with Enbridge Energy.
Mayor Paine, Paul Eberth, Dean Will, and Bob Steede left the meeting at 6:44 p.m.
4.9. Recommendation to approve an Engineering Design Contract with SEH to create 100%
design plans for the Dwight’s Point Phase II Project at an estimated cost of $115,500.00.
Director Carlson announced that the project, funded by the Wisconsin Coastal Management
Program and the National Oceanic and Atmospheric Administration grants, aims to replace
outdated culverts with modern, environmentally friendly designs to enhance stream health
and facilitate fish passage. The design plans, currently at 60% completion, are set to reach
full completion this year. Construction will commence once additional funding is obtained.
MOTION by Elm, second by Moffat and carried to approve an Engineering Design
Contract with SEH to create 100% design plans for the Dwight’s Point Phase II
Project at an estimated cost of $115,500.00.
4.10. Recommendation to approve a Construction Cooperative Agreement between the City of
Superior and Superior Water, Light and Power to support elimination of lead service lines in
the City of Superior.
MOTION by Ledin, second by Elm and carried to approve a Construction
Cooperative Agreement between the City of Superior and Superior Water, Light and
Power to support elimination of lead service lines in the City of Superior.
PUBLIC WORKS COMMITTEE – 6/04/2026 Meeting (Meets monthly on 1st Thursday at 5 p.m.) Page 5 of 5
*Attended virtually
5. RECURRING BUSINESS
5.1 ESD Director’s Update – Received and Filed
5.2 Director Update –
5.1.1 The Spring Cleanup was successful this year; however, it is essential to address the
Spring Cleanup Ordinance in a future meeting.
5.1.2 The Sidewalk Replacement Program is set to commence shortly, with a contractor
scheduled to arrive on North Tower Avenue to address and grind down any tripping
hazards.
5.1.3 The Lead Service Line Project is progressing as planned, with Hanco Utilities
officially involved. A recent pre-construction meeting was held with representatives
from Hanco, LHB, and Superior Water, Light & Power. Construction is set to
commence in the midtown area around June 8th.
5.1.4 Tower Avenue roadway construction is paused while the contractor for the lead
service line replacement project does their lead line work between Belknap and North
28th. When the Tower roadway project commences, the roadway will be milled and
asphalt overlaid. This is an alteration from the original plan to diamond grind the
surface. The change results in increased cost of $363K, but also in a better, more
reliable, and smoother surface. The increased cost is paid for by budgeted funding for
roadway paving.
5.3 Future Agenda Items
5.1.1 Discuss Water Utility Acquisition
5.1.2 Spring Cleanup Ordinance
5.4 Confirm the next meeting date as July 2, 2026, at 5:00 p.m. in Room 204 of the
Government Center.
6 ADJOURNMENT
Councilor Ledin announced the meeting adjourned at 7:04 p.m.
Respectfully submitted by Kara Czapinski
MEMORANDUM
Date: July 02, 2026 Council Agenda Date: July 21, 2025
TO: Mayor Jim Paine and the Common Council
FROM: Chris Carlson, Public Works Director
RE: Amendment to the Electrical Services Contract with Benson Electric
I am recommending approval of an amendment to the city’s electrical services contract with Benson
Electric. The amendment extends the period of the contract through May 29, 2027 and updates the
hourly rate schedule.
1. Introduction - Benson Electric is the city’s contactor for the routine maintenance and on-call
repair services of city traffic signals and street lighting.
2. Background - Benson Electric has years of experience and knowledge with our system. They
have performed the work well with a high level of quality and responsiveness. Work is often
unpredictable caused by unexpected failures or vehicle damage. Accidents occur late at night
and become an emergency when a street light is lying in the street or a traffic signal is
inoperable. Benson Electric responds immediately to address the issue.
The amendment includes an adjustment to their rate schedule. The increases average
approximately 7%. The most common used unit price, Journeyman Electrician with Service Van,
increased 5% from $128 to $135.
3. Budget Source - This work will continue to be paid from the budgeted general fund accounts for
traffic signal repair and street light repair.
4. Conclusion - I recommend approval of an amendment to the city’s electrical services contract
with Benson Electric extending the period of the contract through May 29, 2027 with updated
hourly rates.
Recommended: ________________________________
Mayor Jim Paine
Public Works Department
Phone: (715) 395-7334
Fax: (715) 395-7346
E-mail: publicworks@ci.superior.wi.us
Website: www.ci.superior.wi.us
Public Works Director
Todd Janigo
1316 N 14th Street, Suite 200
Superior, WI 54880
1
1
Amendment V
To the
Electrical Services Agreement
Between
The City of Superior
And
Benson Electric Company
This Amendment made this ___ day of July 2026, by and between Benson Electric
Company, (herein known as ‘Contractor’), and the City of Superior, a municipal
corporation, through its Public Works Department (herein known as ‘City’) are parties to
an Agreement dated February 15, 2022, for traffic signal and street lighting repairs and
modifications on City-owned traffic signals and fixtures.
Both Parties desire to amend the Agreement as follows:
1.3 Article II - Contract Price
The Owner shall pay the Contractor for the performance of this contract an
amount based upon the unit prices contained in Exhibit A for the actual measured
quantities of work done on a time and material basis. Unit prices are attached as
Attachment A to this Amendment. Attachment A is by reference hereby incorporated
into this Amendment.
Contractor shall not be entitled to payment for work found deficient or failing to
conform to the requirements set forth in this agreement and is not entitled to further
payments until corrected to the satisfaction of the Director of Public Works at the cost of
the Contractor. The City will inform the Contractor of any deficiencies and/or items that
do not conform to this contract within thirty (30) days of receipt.
Unless otherwise provided in the special provisions, payments are to be made to
the Contractor within 30 days of receipt of an approved payment application/invoice on
the basis of written approval of estimates by the Owner of the value of the work
performed during the preceding billing period.
Contractor must provide approved monthly detailed invoices to the City. All
invoices shall identify the specific services performed at identified locations for which
payment is requested, date of service, description of the services, materials, the applicable
rates and photos of any damage caused by a person or vehicle.
2.6 TERM OF AGREEMENT
The term of this agreement shall be from the date of the agreement through May
31, 2027.
2
All other terms and conditions of this agreement remain in full force and effect.
The parties, intending to be legally bound, have executed this amendment on the day and
year set forth above. The Contractor represents that it has the authority to enter into the
Amendment. If the Contractor is not an individual, the person(s) signing on behalf of the
Contractor represents and warrants that they have been duly authorized to bind the
Contractor and sign this Amendment on the Contractor’s behalf.
Signatures
SIGNED AND SEALED:
COMPANY: Benson Electric Company
ADDRESS: 1102 North Third Street, Superior, Wisconsin 54880
PHONE: 715-394-5547
_____________________________
William T. Slattengren, President
ATTEST: CITY OF SUPERIOR, WISCONSIN
______________________________ ___________________________________
Jim Paine, Mayor Heidi Blunt, City Clerk
______________________________ ___________________________________
Nicholas Rhinehart, Finance Director Frog Prell, City Attorney
Provision has been made to
pay the liability that will
accrue under this contract.
Approved by the Superior Common Council on:
BENSON ELECTRIC COMPANY
Contractors, Manufacturers And Engineers
1102 North Third Street
Superior, Wisconsin 54880
715-394-5547
Motorshop 715-394-5547
Billing Rates for City of Superior
for the Period
May 31, 2026 through May 29, 2027
Electrical Construction Personnel: Rate Per Hour
Foreman Electrician 133.00
Journeyman Electrician 118.00
Journeyman Electrician with Service Van 135.00
Apprentice Electrician 94.00
With Truck add to hourly rate 14.00
Journeyman with van roadway work w/o barricades 147.00
105.00
Limited Energy Personnel:
Foreman Tech With Service Van 133.00
Journeyman Technician with Service Vehicle 127.00
Journeyman Installer 84.00
135.00
Motor Shop
On Site Service Call 94.00
In Shop Repair 82.00
Manufacturing Department Personnel:
Machinist 82.00
Delivery:
Pickup Truck and Driver, Plus .725/mil 68.00
Shop Help 65.00
Rental:
Trencher $300/day
Fusion Splicer $60/hr-$180/day
Fiber optic tester/Cat 6 $50/Hr-$150/day
Power Quality Analyzer $20/Hr-Daily $60-Wk $240
Bucket/Boom Truck $400/day-$100/Hr
Cable & Fault Locator $85.00/day
Mini-excavator with trailer $125/HR $500/day
Tow Behind Lift $200/day-$50/HR
Material Markup 10%
Subcontractor or expense plus 10%
When working on any county,state or federal roadway a 13% Labor rate increase applies where permanent barricades are
not present
Safety Manager-Training-Advising
Subsistance for all jobs outside of 35 mile radius of Lake Ave & Superior Street in Duluth (as determined by google maps) -
$25.00
Subsistance for all jobs outside of 70 mile radius of Lake Ave & Superior Street in Duluth (as determined by google maps)
will be paid for Board & Room (if employee stays overnight) at the current GSA rate and for Meals & Incidentals as
established June first of each year
Apprentice labor roadway work w/o barricades
Memorandum
TO: The Public Works Committee
FROM: Patrick Rohde, Assistant Chief Building Inspector
DATE: June 25, 2026
RE: SCO CH. 34 - Commercial Plan Review
The Building Inspection Division requests the following amendment to SCO. Sec. 34-73 parens (f) as it
relates to the Delegated Authority for commercial plan review by the Wisconsin Department of Safety
and Professional Services. The City Building Inspection Division may request delegation as an appointed
agent for review of commercial buildings and structures of all sizes. This increased delegation will
improve the wait times for large commercial building plan reviews within the City of Superior.
(f) Commercial building. State approved plans must be submitted with the application for a building or
construction permit. The City of Superior is authorized (SPS 361.60) to perform plan review for the
following list of building categories and also do commercial buildings and structures of all sizes within
the city, and perform inspections of all commercial buildings and structures as an agent of the state,
including those for which the department of safety and professional services does the plan review:.
(1) New buildings containing less than 50,000 cu. ft. total volume;
(2) Additions to existing buildings where the total volume after construction of the addition is less than
50,000 cu. ft.;
(3) Additions to existing buildings containing no more than 2,500 sq. ft., no more than one floor level,
18-foot maximum roof span and 12-foot maximum exterior wall height; and
(4) Alterations to an existing building where the area of altered space is less than 100,000 cu. ft. of total
volume.
This ordinance change is a requirement from the Department of Safety and Professional Services when a
change in delegation occurs. The delegation as an appointed agent requires plan review oversight by a WI
licensed design professional such as an engineer or architect. While the proposed plan is to contract with
a third party, The City could also elect to hire a design professional as a full-time employee in the
Building Inspection Division
Public Works Department
Phone: (715) 395-7288
Fax: (715) 395-7346
Website: www.superiorwi.gov
Email: buildingsafety@superiorwi.gov
1316 North 14th Street
Suite 230
Superior, WI 54880
Building Inspection Division if contracting with a third party becomes undesirable. Additionally, nothing
would prevent The City or permit applicants from electing to have projects reviewed by DSPS as they are
able to do currently. It is my opinion that receiving delegation as an appointed agent could only benefit
The City and permit applicants as it would allow for more plan review options and quicker review times
while not reducing any services or plan review options that are currently available.
Sincerely,
Patrick Rohde
Asst. Chief Building Inspector
Building Inspection Division
City of Superior
Created: 2026-05-07 10:59:23 [EST]
(Supp. No. 38)
Page 1 of 2
Sec. 34-73. Other required information.
(a) Erosion control plan. An approved erosion control plan in accord with section 34-201 and a copy of the NOI
submitted to the department of natural resources shall be submitted with an application for a building
permit unless exempt from this requirement. An erosion control or g rading permit is required before any
construction or grading is performed if over the limits set by section 34 -201.
(b) Post construction stormwater management plan. An approved post construction stormwater management
plan in accord with section 114-210 shall be submitted with the building permit application unless exempt
from this requirement. No land disturbing construction activity subject to the limits set by sect ion 114-210
may begin with out a post-construction "storm water management" permit.
(c) Driveway permit.Section 106-110 "It shall be unlawful for any person having ownership, charge, control,
operation or management of any real property to construct any driveway or any motor vehicle entry, exit, or
access from the real property onto any public street, or to cut the curb fronting upon, abutting upon,
adjacent to, or contiguous to the real property, or to widen an existing curb, driveway, entry, exit or access
without having first obtained a permit therefore." A driveway permit shall be obta ined before a building
permit application is submitted for any new structure requiring a new access to a street, alley or public way.
(d) Parking lot landscaping. Approval procedure (section 122-725).
(1) Prior to the issuance of any building permit, all required landscape plans shall be reviewed and
approved by the planning director. No landscaping plan shall be approved unless it conforms to the
requirements of chapter 122, section 122-725, except as noted elsewhere in this chapter.
(2) All landscaping areas shall be provided and all landscape materials shall be installed consistent with the
approved landscaping plan, prior to the issuance of a certificate of occupancy.
(e) Zoning approval. All the requirements of chapter 122 shall be reviewed and approved by the planning
director before the building permit or construction permit application is approved or issued. This shall
include proposed building use, building height and area, setbacks, outdoor lighting, landscaping, site
drainage, buffers, number of parking spaces, surface of parking spaces, and other plan components listed in
chapter 122.
(f) Commercial building. State approved plans must be submitted with the application for a building or
construction permit. The City of Superior is authorized (SPS 361.60) to perform plan review for the following
list of building categories and also do commercial buildings and structures of all sizes within the city, and
perform inspections of all commercial buildings and structures as an agent of the state, including those for
which the department of safety and professional services does the plan review:
(1) New buildings containing less than 50,000 cu. ft. total volume;
(2) Additions to existing buildings where the total volume after construction of the addition is less than
50,000 cu. ft.;
(3) Additions to existing buildings containing no more than 2,500 sq. ft., no more than one floor level, 18 -
foot maximum roof span and 12-foot maximum exterior wall height; and
(4) Alterations to an existing building where the area of altered space is less than 100,000 cu. ft. of total
volume.
(g) Commercial building other. State approved plans for HVAC, plumbing, lighting and emergency lighting, fire
suppression systems, and any other structural or mechanical systems, assemblies or components requiring
state approval must be submitted with the permit application in accordan ce with the state plan approval
procedure.
Created: 2026-05-07 10:59:23 [EST]
(Supp. No. 38)
Page 2 of 2
The City of Superior Building Inspector may require state approval at his or her option not to review plans
per SPS 361.60(5)(d)1.
(h) Heat or energy loss calculations. Calculations, methods, programs or other procedures approved by the
department of safety and professional services to show conformance with the appropriate minimum energy
standard for the type of structure shall be submitted with the building permit applic ation.
(i) Dwellings—Water calculation worksheet. A water calculation worksheet shall be submitted with all plumbing
permit applications for new construction and large additions as determined by the building or plumbing
inspector.
(j) Dwellings—Makeup air and combustion air worksheet. A makeup air and combustion air worksheet shall be
submitted with all building permit or mechanical (HVAC) permit applications for new construction, large
additions and alterations to mechanical systems.
(Ord. No. O13-3840, § 1, 7-2-2013)
Memorandum
TO: The Public Works Committee
FROM: Patrick Rohde, Assistant Chief Building Inspector
DATE: June 25, 2026
RE: SCO CH. 34 - Commercial Plan Review
The Building Inspection Division has recognized the need for the expansion of our services to provide commercial property
owners, contractors, and developers with a streamlined plan review process for projects exceeding our current delegation of
small commercial building projects, which include the following:
• New structures containing less than 50,000 cubic feet total volume.
• Additions to existing structures where the total volume after construction of the addition is less than 50,000 cubic
feet.
• Additions to existing structures containing no more than 2,500 square feet of floor area and no more than one floor
level provided an 18-foot maximum roof span and 12-foot maximum exterior wall height.
• Alterations of spaces involving less than 100,000 cubic feet of volume.
Through a contractual agreement with an independent inspection agency, the City Building Inspection Division may request
delegation as an appointed agent for the review of commercial buildings and structures of all sizes. This increased delegation
will significantly improve the wait times for large commercial building plan reviews.
Currently, projects that are beyond the scope of our delegation must be reviewed by the State of Wisconsin DSPS. The
average DSPS plan review timeline is 5-7 weeks after complete submittal. Under an agreement with a third-party review
agency, the review would be completed in no more than 15 days after complete submittal.
Additionally, review fees that would normally be paid to DSPS would instead be paid to the third -party review agency, with
the Building Inspection Division receiving revenue at a rate of 10% of the review fee that remains after a required 10%
contribution to DSPS by the review agency. This revenue could either be retained by the department or be used in unique ways
to either offset permit costs for the project applicant or as a scholarship fund for local students.
I am recommending a one-year contract with Redline Plan Review for the review of all projects of 50,000 cubic feet or larger.
Redline has demonstrated their capabilities to myself and the department, and I believe that this partnership would be a grea t
benefit to our city. Please see the attached contract for information and terms.
Sincerely,
Patrick Rohde
Asst. Chief Building Inspector
Building Inspection Division
Building Inspection Division
Public Works Department
Phone: (715) 395-7288
Fax: (715) 395-7346
Website: www.superiorwi.gov
Email: buildingsafety@superiorwi.gov
1316 North 14th Street
Suite 230
Superior, WI 54880
Agreement
Professional
Services Agreement
This Agreement made this ____ day of July 2026, by and between Redline Plan Review, LLC,
located in Superior, Wisconsin (herein known as ‘Consultant’), and the City of Superior, a
municipal corporation, through its Public Works Department (herein known as ‘City’). The
parties to this Agreement shall be bound by the following terms and conditions.
Scope
Consultant services include the tasks, activities and requirements to conduct building, heating,
ventilation and air conditioning (HVAC), fire alarm, and/or fire sprinkler plan reviews for
buildings containing a volume of 50,000 cubic feet or greater that are submitted by applicants
seeking approval. Upon request by the City, the Consultant shall also review any other requested
plan review that is less than 50,000 cubic feet. The Consultant shall perform reviews and take
initial review action within fifteen (15) business days following receipt of a complete submittal
package. Consultant shall perform services within scope of this Agreement to complete
delegated plan review responsibilities under the State of Wisconsin Department of Safety and
Professional Services (DSPS) requirements, including initial reviews, resubmittal reviews,
written correction notices, code interpretations, coordination with applicants, maintenance of
required records, and issuance of approvals, or denials,as authorized by law. Repeated failure to
meet turnaround requirements shall constitute a material breach of this Agreement.
Consultant shall immediately disclose any actual or potential conflict of interest involving a
project under review.
Consultant shall be solely responsible for code interpretations and review decisions rendered
under its delegated authority.
Consultant shall maintain all certifications, approvals, licenses, registrations, delegated authority,
and qualifications required by Wisconsin DSPS and applicable law throughout the term of this
Agreement. Loss of any required authority shall constitute a material breach and grounds for
immediate termination.
If there are other tasks identified by the City that are beyond the scope identified in this section,
these will be considered extra services and can be added to this Agreement by an amendment.
Term
The term of this Agreement shall be from the date of this Agreement through June 30, 2027. This
Agreement may be extended or amended by written amendment upon mutual agreement of terms
and conditions.
Payments to the City
The Consultant shall collect all plan review fees for the projects submitted to the Consultant for
review. The Consultant shall submit the fees to the DSPS as required by their delegation
requirements. The Consultant shall submit to the City ten percent (10%) of the review fee
remaining after the payment to DSPS has been made for their portion. Payments due the City
shall be remitted monthly no later than the fifteenth (15th) day of the following month.
The Consultant shall submit to the City a monthly report identifying the following: Project
name, permit number, fees collected, DSPS fees paid, amount retained, amount due to the City.
The City shall have the right to audit the Consultant’s books and records relating to fees
collected, payments made to DSPS and amounts payable to the City.
Changes to services and/or fees that are agreed to by both parties shall be acknowledged in an
amendment signed by both parties.
Insurance
Consultant shall provide up-to-date, accurate professional liability information on Consultant’s
Data Record, including amount of insurance, deductible, carrier and expiration date of coverage.
Consultant shall furnish the City with an endorsement for earlier notice of cancellation and/or
non-renewal and the Certificate of Insurance showing the type, amount, deductible, effective date
and date of expiration of such policy. Consultant shall not cancel or materially alter this coverage
without prior written approval by the City. Consultant shall be responsible for consultants
maintaining professional liability insurance during the life of their Agreement and for 2 years after
final acceptance for the service.
Consultant and its subconsultants retained under the terms of this Agreement shall procure and
maintain professional liability insurance providing for payment of the insured's liability for errors,
omissions or negligent acts arising out of the performance of the professional services required
under this Contract.
It is hereby agreed and understood that the insurance required by the City is primary coverage
and that any insurance or self-insurance maintained by the City, its officers, council members,
agents, employees or authorized volunteers will not contribute to a loss caused solely by
Consultant. All insurance shall be in full force prior to commencing work and remain in force
until the entire job is completed and the length of time that is specified, if any, in the Agreement
or listed below whichever is longer.
1. PROFESSIONAL LIABILITY
A. Limits
(1) $1,000,000 each claim
(2) $1,000,000 annual aggregate
B. Must continue coverage for 2 years after final acceptance for service/job
2. WORKERS COMPENSATION AND EMPLOYERS LIABILITY
A. Must carry coverage for Statutory Workers Compensation and an
Employers Liability limit of:
(1) $100,000 Each Accident
(2) $500,000 Disease Policy Limit
(3) $100,000 Disease - Each Employee
3. ADDITIONAL INSURANCE PROVISIONS
A. Primary and Non -contributory requirement - all insurance must be primary and non -
contributory to any insurance or self-insurance carried by City
B. Acceptability of Insurers - Insurance is to be placed with insurers who have an A.M. Best
rating of no less than A- and a Financial Size Category of no less than Class VII, and who
are authorized as an admitted insurance company in the state of Wisconsin.
C. Additional Insured Requirements - The following must be named as additional insureds
on the General Liability and Business Automobile liability coverage arising out of project
work - City, and its officers, council members, agents, employees and authorized volunteers.
This does not apply to Workers Compensation Policies.
D. Deductibles and Self-Insured Retentions - Any deductible or self-insured retention must be
declared to and approved by the City.
E. Evidences of Insurance - Prior to execution of the agreement, the Consultant shall file with
the City a certificate of insurance (Accord Form 25-S or equivalent) signed by the insurer's
representative evidencing the coverage required by this agreement.
F. Provide a waiver of subrogation in favor of the City for the workers’ compensation and liability insurances.
Agreement General Terms and Conditions
1. No Relationship. Consultant understands and agrees that the relationship of Consultant and
the City arising out of this Agreement is that of a contracted service provider, not an employee or
contracted employee of the City or any other entity within the municipality, and therefore, is not
entitled to any benefits provided to employees of the City.
2. Taxes. Consultant will act as an independent contractor and will be responsible for all
federal, state and local taxes arising in accordance with Consultant’s performance of this
contract.
3. Confidentiality. Both parties shall diligently protect the confidentiality of any
information, documentation or communication transmitted to or received from the City that
contains personal, financial or other information of a confidential nature, and shall not
disclose said information to any other persons, organizations or entities without the
expressed written approval of the other party, except that Consultant may disclose
confidential information that is reasonably necessary to defend itself in the event of a
dispute. Nothing herein shall be construed to conflict with the obligations under Wisconsin
Public Records Law, Wis. Stat. §19.31, et. Seq.
4. Qualifications. By accepting this Agreement, Consultant represents that they possess the
necessary skills and qualifications to perform work under this Agreement. Consultant will
comply with all applicable local, state, and federal licensure requirements and will provide proof
upon request.
5. Legal Relations. Recommendations, policies, procedures and other communications provided
by the Consultant under this Agreement will comply with all applicable laws, ordinances, rules
and regulations promulgated and enforced by the City and any other proper authority having
jurisdiction over the conduct of the operations of the City. The Consultant shall comply with and
observe federal, state and local laws that may be applicable to the project. In carrying out
provisions of this Agreement or exercising power or authority granted to the Consultant thereby,
there shall be no personal liability to the City, it being understood that in such matters the City
acts as representatives of the State. The Consultant is not an agent of the State.
6. Assignment of Agreement. The Consultant shall not subcontract, assign or transfer any part
of this work to any other parties without the express written agreement of the City.
7. Claims. Claims, disputes and other matters in question arising from the performance of
this contract shall be brought to the Director of Public Works for review and mutual
resolution. If the parties cannot mutually resolve the matters in question, the parties shall
endeavor to settle disputes by mediation. A demand for mediation shall be filed, in writing,
within a reasonable period of time after a claim, dispute, or other matter in question has
arisen. In no event shall a demand for mediation be made after the date when the institution
of legal or equitable proceedings, based upon such a claim, dispute, or other matter in
question would have been barred by an applicable statute of limitations.
8. Ownership of Documents. If applicable, all deliverables prepared by the Consultant or any
party pursuant to this Agreement shall become the property of the City of Superior on
completion and acceptance of any of the Consultant’s work, or upon termination of the
Agreement and upon payment with the terms of this Agreement, and shall be delivered to the
City of Superior upon request. All review comments, correspondence, reports, electronic files,
databases, and project records created under this Agreement shall be maintained for a minimum
of seven (7) years after completion or termination.
9. Indemnifications. Consultant hereby agrees to indemnify, defend and hold harmless the City its
elected and appointed officials, officers, employees, agents, representatives and volunteers, and each
of them, from and against any and all third-party suits, actions, legal or administrative proceedings,
claims, demands, damages, and liabilities, (“Third-party Claim”) directly caused, occasioned, or
contributed to in whole or in part or claimed to be caused, occasioned, or contributed to in whole or
in part, by reason of any negligent acts, errors, omissions, recklessness, willful misconduct, or
violation of law, whether active or passive, of Consultant or of anyone acting under its direction or
control or on its behalf, even if liability is also sought to be imposed on the City, its elected and
appointed officials, officers, employees, agents, representatives and volunteers.
Failure to provide notice shall not relieve Consultant of its obligations except to the extent Consultant
demonstrates actual prejudice. The Consultant may assume the defense of a Third-Party Claim with
counsel reasonably acceptable to the City. The City may participate in the defense with counsel of its
choosing at its own expense. No settlement involving admission of liability, monetary obligation, or
other obligation of the city may entered into without the City’s written consent. The City, its elected
and appointed officials will be responsible for their own legal expenses and costs if they choose to
hire additional counsel.
In the event that Consultant employs other firms, corporations or entities (subcontractor) or
volunteers as part of the work covered by this Agreement, it shall be the Consultant’s responsibility
to require and confirm that each sub-contractor enters into an Indemnity Agreement in favor of the
City, its elected and appointed officials, officers, employees, agents, representatives and volunteers,
which is identical to this Indemnity Agreement.
Neither party shall be liable for any indirect, incidental, consequential, special, or punitive damages
arising out of this Agreement. The limitations of liability contained in this section shall not apply to
Consultant’s indemnification obligations, claims arising from Consultant’s gross negligence, willful
misconduct, fraud, violation of law, infringement of intellectual property rights , breach of
confidentiality obligations, or obligations covered by insurance required under this Agreement.
Nothing contained in this Agreement shall be construed as a waiver of any defenses, immunities, or
limitations of liability available to the City, including those provided under Wis. Stat. § 893.80 and
all other applicable law.
This indemnity provision shall survive the termination or expiration of this Agreement.
11. Termination. This Agreement may be terminated by either party without cause upon ten
(10) days written notice to the other. If Consultant fails to perform any obligation under this
Agreement, City may provide written notice of default. Consultant shall have ten (10) days to
cure. Failure to cure constitutes material breach. The City may immediately terminate for loss of
licenses, loss of DSPS delegation, failure to maintain insurance, fraud, misconduct, or material
breach.
12. Entire Agreement. This Agreement contains the entire understanding of the parties with
respect to the maters contained herein and supersedes all other written and oral agreements
between the parties with respect to such matters.
13. Modification. This Agreement is binding only when signed by both parties. Any
modifications or amendments must be in writing and signed by both parties.
14. Force Majeure. Each party shall be excused from any breach of this Agreement which is
caused by war, strike, act of Nature or other similar circumstances normally deemed outside the
control of well-managed businesses.
15. Governing Law. The Agreement will be interpreted, and the rights and liabilities of the
Parties determined, in accordance with the laws of the State of Wisconsin.
16. Public Records. Consultant acknowledges that records relating to this Agreement may
constitute public records under Wis. Stat § 19.31 et seq. Consultant shall cooperate with City in
responding to public records requests and shall provide requested records promptly.
17. Headings and Captions. Headings and Captions appear solely for convenience of reference.
Such headings and captions are not part of this Agreement and shall not be used to construe it.
18. Validity. If any provision or provisions of this Agreement shall be held to be invalid, illegal
or unenforceable, the validity, legality and enforceability of the remaining provisions shall not in
any way be affected or impaired thereby.
19. Integrated Agreement. This Agreement contains the entire agreement and understanding
among the parties regarding the matters set forth herein and supersedes all previous negotiations,
discussions, and understandings regarding such matters. The parties acknowledge and represent
that they have not relied on any promise, inducement, representation, or other statement made in
connection with this Agreement that is not expressly contained herein. The terms of this
Agreement are contractual and not a mere recital.
20. Safety And Security. The Consultant shall at all times perform in a safe and workmanlike
manner to avoid injury or damage to any person or property. The Consultant shall comply with
applicable requirements and specifications relating to the safety, health and sanitation measures
applicable to this Agreement. The Consultant shall exercise the applicable necessary precautions
for the safety of its employees, and be in compliance with applicable federal, state and local
laws, statutes, ordinances, rules and regulations. Including, but not limited to, the Wisconsin
Labor Code, The U.S. Department of Transportation Omnibus Transportation Employee Testing
Act, and OSHA standards.
The Consultant shall provide its employees with all necessary safeguards, devices and protective
equipment, including but not limited to adequate life protection and lifesaving equipment, and
shall ensure the proper inspection and maintenance of safety measures are current and in
compliance.
The City may halt progress on any project where appropriate safety measures and equipment are
not being used or any safety regulations are not being followed. Services will not be permitted to
resume until required safety provisions have been made and delays as a result of this provision
will not be considered a basis for an increase in the Agreement price or an extension of the
completion deadline.
21. Standard of Care. Consultant represents that it will perform the Services in a manner
consistent with that degree of care and skill ordinarily exercised by members of the same
profession currently practicing under similar circumstances at the same time and in the same
locality. To the extent Consultant’s services do not meet this standard of care; Consultant shall
re-perform its work at no cost to the City.
22. Non-Discrimination. Upon execution of this Agreement, Contractor agrees as follows:
Contractor and all Subcontractors do not discriminate against any employee, applicant for
employment, independent contractor, or any other persons because of race, color, religion, sex,
sexual orientation, gender identity, or national origin.
23. Authority. The Consultant represents that it has the authority to enter into this Agreement.
If the Consultant is not an individual, the person(s) signing on behalf of the Consultant represents
and warrants that they have been duly authorized to bind the Consultant and sign this Agreement
on the Consultant’s behalf.
The parties intending to be legally bound have executed this Agreement on the day and year set
forth above.
Signatures
Company: Redline Plan Review, LLC
Address: 916 Hammond Ave, Suite 100 Superior, WI 54880
_____________________________
Thomas A. Westlund
ATTEST: CITY OF SUPERIOR, WISCONSIN
___________________________________
Jim Paine, Mayor Heidi Blunt, Clerk
___________________________________
Nicholas Rhinehart, Finance Director Frog Prell, City Attorney
Provision has been made to
pay the liability that will
accrue under this contract.
Sec. 114-62. - User charges
(e)Hauled waste charges.
(1)A hauled waste user charge shall be imposed on all truckloads of hauled waste in an amount
sufficient to pay the costs of operation and maintenance of the hauled waste station and
the cost of treatment of the hauled waste. The user charge for hauled waste shall be
composed of a fixed charge and a variable charge similar to connected users.
(2)Each truckload of hauled waste shall be charged a fixed fee equal to 2.5 times the monthly
residential fixed fee.
(3)The variable hauled waste charge shall be based on the volume and load characteristics of
the hauled waste.
a.Holding tank waste shall be charged 1.4 times the residential volume rate per equivalent unit
of volume.
b.Septage tank waste shall be charged 3.5 times the holding tank rate.
c.Other liquid hauled waste shall be evaluated based on loading characteristics of the waste as
determined by sample analysis and the rates in section 114-62(c).
d.Under no circumstances shall a variable user charge to an industrial connection or for other
hauled waste be less than the variable user charge imposed herein for residential and
commercial connections.
Memorandum
DATE: June 29, 2026
TO: Members of the Public Works Committee
FROM: Steve Roberts, Environmental Services Director
RE: ESD Director’s Report for the July 2026 PWC Meeting
1) Wastewater Treatment
a) A total of 146.5 million gallons (MG) of treated effluent was discharged in May from the
main Wastewater Treatment Plant (WWTP) and CSTPs, as follows:
146.5 MG @ WWTP
0.0 MG @ CSTP 2 (adjacent to
WWTP)
0.0 MG @ CSTP 5 (South Superior)
0.0 MG @ CSTP 6 (Billings Park)
b) All effluent discharges complied with permit limits.
2) Collection System
a) The sewer maintenance crew continues to perform routine sewer cleaning in addition to
rehab work.
SR/sr
C: ESD Managers, Chris Carlson, Todd Janigo
Environmental Services Division
Public Works Department
Phone: (715) 394-0392 Ext. 1034
Fax: (715) 394-0406
E-mail: robertss@superiorwi.gov
Website: www.superiorwi.gov
ES Director
Steve Roberts
51 E 1st Street
Superior, WI 54880