Town of River Falls Town Board
12/1/2025 Meeting Materials
TOWN OF RIVER FALLS
The following River Falls Town Meetings will meet on Monday, December 1, 2025, beginning at 6:00 P.M. at the
River Falls Town Hall, W9015 770th Ave.
6:00 P.M. – Plan Commission Agenda: Minutes; Zoning Administrator Report; Review Special Use Application for
Home Based Business at N6644 950th Street; Discuss and Take Possible Action on Expansion of Non-Conforming
Use at N8701 County Rd W; Discuss Multi-Family Dwellings; Updates from Sub-Committees; Public Comments &
Requests; A quorum of Town Board members may be present.
7:00 P.M. Regular Board Meeting
AGENDA
Call to order
Consider for approval or other action:
1. Approve Agenda
2. Minutes from November 17, 2025, Regular Board Meeting
3. Minutes from November 19, 2025, Impact Fees Meeting
4. Financial/Fire Call Report
5. Public Comments and Requests
6. Zoning Administrator Report
7. Plan Commission Report
8. Review of the Conditional Use Permit for Marzolf Company, N8701 County Rd W
9. Discuss Proposed Impact Fee and Needs Assessment study Final Draft
10. Discuss and Take Action on 2026-2030 Ambulance Contract
11. Set Date for 2026 Town Caucus
12. Finalize Plan for Holiday Reception
13. Board and Staff Communications
14. Audit and Pay Bills
15. Future Agenda Items
16. Adjourn
Action may be taken on any agenda item. This agenda is subject to change. Some agenda items may be taken up earlier in the meeting, or in a different order than
listed. The posted notice at the Town Hall is the primary notice. Meeting notice posted on the Town’s website www.riverfallstown.com, and at the River Falls Town Hall,
W9015 770th Avenue, River Falls, WI. Anyone wishing to attend the meeting who requires special accommodation because of a disability should contact the Clerk’s
office, at 715-629-8240 or email clerk@riverfallstown.com, at least 72 hours before the meeting begins so that appropriate accommodations can be made.
Sarah Meyer, Clerk
TOWN OF RIVER FALLS – REGULAR BOARD MEETING
Monday, November 17, 2025, River Falls Town Hall
Elected officials and staff present: Terry Kusilek, Chair; Mary Foster, Siri Smith, Joe Mahoney, Brad Mogen,
Supervisors; Rita Kozak, Treasurer; Sarah Meyer, Clerk; Don Rodewald, Zoning Administrator; Guests present:
Wendy DiPeso, Jerome Rodewald, Mark Edlund, Jeff Marzolf
The meeting was called to order by Chair Terry Kusilek at 7:10pm. Joe made a motion that the agenda be
approved as posted. Siri seconded. M.C.
Joe moved to approve the minutes of the November 3, 2025, Regular Board meeting. Brad seconded. M.C.
Financial Report/Fire Call Report: Treasurer Rita provided the Treasurer’s Report. The current available
balance is $659,762.90. Brad moved, and Joe seconded to approve the financial and fire call reports. M.C.
Public Comments & Requests:
Zoning Administrator Report: Zoning Administrator Don Rodewald provided the zoning report (attached). Joe
made a motion to accept the Zoning Administrator’s report. Mary seconded. M.C.
Plan Commission Report: No action taken.
Review of the Forestville Winery and Event Center, W8101 690th Ave, Conditional Use Permit: Mark Edlund,
Forestville Winery owner, was present. Siri moved to change the Conditional Use Permit as discussed. Joe
seconded the motion. M.C.
Discuss and Take Action on 2026-2030 Ambulance Contract: Mary moved to table this topic to the December
1, 2025 meeting.
Discuss Innovation Grant: Several possible projects were discussed; more research will be done before action
is taken.
Discuss Possible Changes to Town Code Chapter 8: Public Works: Roads committee will review and bring
forward suggested changes in 2026.
Review and Approve Town Policy Updates: Brad moved to approve policy changes as discussed. Siri seconded.
M.C.
Board and Staff Communications: Rita updated the group that there will be no recycling meeting in December.
Joe shared that the Recycling Center will be getting a new dumpster for metal recycling soon. Also, that there
will be pricing changes starting in spring for non-resident users of the center. Mary encouraged the Board to
explore Town Parks after so much work has been done throughout the summer. Joe moved and Siri seconded
to approve a $75 memorial be sent to the Smith family after the passing of Joe Smith, former Recycling Center
employee. Sarah requested an update to the Pierce County emergency call out list. Terry, Rob and Dalton will
be added to the list. Sarah reminded the group that starting an emergency response planning group had been
previously discussed. It will be added to a January agenda. Don shared that during the research into the
Marzolf company regarding their requested new CUP, it was discovered that they are out of compliance with
their existing Conditional Use Permit. A CUP review will be conducted on December 1, 2025. Jerome shared
that he sold a cemetery lot to Art and Diana Smith and their son Joe has been buried there.
Siri moved to audit and pay bills, Mary seconded. M.C.
Future Agenda items:
• Approve Agenda • Minutes from November 17, 2025, Regular
Board Meeting
• Financial/Fire Call Report
• Public Comments and Requests
• Zoning Administrator Report
• Plan Commission Report
• Conditional Use Permit Review for Marzolf
Company, N8701 County Rd W
• Set Date for 2026 Town Caucus
• Finalize Plan For Holiday Reception
• Approve Ambulance Contract
• Board and Staff Communications
• Future Agenda Items
• Audit and Pay Bills
• Adjourn
Joe moved to adjourn. Siri seconded. M.C. Meeting adjourned at 9:11pm.
Minutes for Joint Meeting with the Town Board, Impact Fee sub-committee and Stantec
representative Angela Popenhagen November 19th, 2025.
Members present, Terry Kusilek, Brad Mogren, Joe Mahoney, Mary Foster, Marty Ruemmele,
Don Rodewald, Jerome Rodewald.
Stantec Representative Angela Popenhagen was present.
Only agenda item was to review proposed draft of the Needs Assessment and Impact Fee
update recommendation.
Meeting called to order @ 6:03 pm.
Angela went through the entire document and answered questions along the way.
Jerome recommended changing the Public Works Facility from the 4900 square foot
building to the larger size of 7000 square feet. All members present agreed, Angela will
make the change before Dec. 1st meeting.
Meeting adjourned @ 7:12pm motion by Brad 2nd by Marty all voted in favor.
Minutes by Terry Kusilek
Type DateNum Name Memo Clr Split Amount Balance
Ordinary Income/Expense
Income
Fire Protection
Fire Inspection Fees
Deposit 11/19/2516219Marzolf Co. FI 5268 Money Market Acc...50.00 50.00
Total Fire Inspection Fees 50.00 50.00
Total Fire Protection 50.00 50.00
Interest Earned MM, CDs, Ck
Public Equity Account
Deposit 11/30/25CashRCU Public Equity Int...Royal Credit Union1,010.47 1,010.47
Total Public Equity Account 1,010.47 1,010.47
Interest Earned Money Market
Deposit 11/30/25Cashfnbrf MM Interest 5288Money Market Acc...812.67 812.67
Total Interest Earned Money Market 812.67 812.67
Total Interest Earned MM, CDs, Ck 1,823.14 1,823.14
Other Revenue
Refunds
Deposit 12/01/25107194Pierce County TreasurerVoting equipt ref...Money Market Acc...1,725.00 1,725.00
Total Refunds 1,725.00 1,725.00
Total Other Revenue 1,725.00 1,725.00
Public Charges for Services
Recycling Center
Deposit 11/19/25151747J.R's Recycling 5264Money Market Acc...385.00 385.00
Deposit 11/19/258474Greg Elliott Recycling 5265Money Market Acc...65.00 450.00
Deposit 11/19/251114Eric Deaton Recycling 5266Money Market Acc...60.00 510.00
Deposit 11/19/25379Cooper Craig-CasmerRecycling 5267Money Market Acc...60.00 570.00
Deposit 11/19/252430Kris Torkelson Recycling 5269Money Market Acc...13.00 583.00
Deposit 11/19/25500Lukas Nelson Recycling 5270Money Market Acc... 9.00 592.00
Deposit 11/19/25CashJoe Mahoney Recycling 5271Money Market Acc...1,023.95 1,615.95
Deposit 11/24/251115Eric Deaton Recycling 5273Money Market Acc...75.00 1,690.95
Deposit 11/24/2515643Mark Andrle Recycling 5274Money Market Acc...70.00 1,760.95
Deposit 11/24/25380Cooper Craig-CasmerRecycling 5275Money Market Acc...60.00 1,820.95
Town of River Falls
12/01/25 Profit and Loss Detail
November 18 through December 1, 2025
Page 1
Type DateNum Name Memo Clr Split Amount Balance
Deposit 11/24/25413Jonathan WilliamsRecycling 5276Money Market Acc...53.00 1,873.95
Deposit 11/24/258475Greg Elliott Recycling 5277Money Market Acc...40.00 1,913.95
Deposit 11/24/252595John O'Boyle Recycling 5278Money Market Acc...25.00 1,938.95
Deposit 11/24/252723STR ConstructionRecycling 5279Money Market Acc...25.00 1,963.95
Deposit 11/24/2511935Peter Stern Recycling 5280Money Market Acc...25.00 1,988.95
Deposit 11/24/255772Thomas Stoiber Recycling 5281Money Market Acc...24.00 2,012.95
Deposit 11/24/256074Randall Mittag Recycling 5282Money Market Acc...15.00 2,027.95
Deposit 11/24/25504Lukas Nelson Recycling 5283Money Market Acc...10.00 2,037.95
Deposit 11/24/25503Lukas Nelson Recycling 5284Money Market Acc... 9.00 2,046.95
Deposit 11/24/251136Frederic FeisthauerRecycling 5285Money Market Acc... 7.00 2,053.95
Deposit 11/24/25CashGarrett Gill Recycling 5286Money Market Acc...1,260.80 3,314.75
Deposit 11/24/255287Kris Torkelson Recycling 5287Money Market Acc... 9.00 3,323.75
Total Recycling Center 3,323.75 3,323.75
Total Public Charges for Services 3,323.75 3,323.75
Rent Receipts
Deposit 11/19/252457David Kusilek Land Rent 5272Money Market Acc...1,200.00 1,200.00
Total Rent Receipts 1,200.00 1,200.00
Taxes
Tax Chargeback
Deposit 12/01/25107195Pierce County TreasurerRefunded/rescin...Money Market Acc...1,828.74 1,828.74
Total Tax Chargeback 1,828.74 1,828.74
Total Taxes 1,828.74 1,828.74
Total Income 9,950.63 9,950.63
Net Ordinary Income 9,950.63 9,950.63
Net Income 9,950.63 9,950.63
Town of River Falls
12/01/25 Profit and Loss Detail
November 18 through December 1, 2025
Page 2
TOWN OF RIVER FALLS
TREASURER’S REPORT
December 1, 2025
FNBRF MONEY MARKET $ 900,992.37 12/01/25
TRANSFERS
DESIGNATED FUNDS IN MM $ - 44,937.00 Highway Equip't
$ - 40,000.00 Capital Outlay
MONEY MARKET AVAILABLE $ 816,055.37
ROYAL CREDIT UNION
$ 25.24 Business Savings
$ 329,285.92 Entity Account
$ -20,688.44 Revaluation SEE ATTACHED
Impact Fees
OPEN NEW
ACCOUNT
RCU AVAILABLE $ 308,642.72
TOTAL AT BOTH BANKS $ 1,124,698.09
RECOMMENDED RESERVE $ 445,653.00
AVAILABLE FUNDS $ 679,045.09 See 2025 budget
Bank account transactions 2018-present
Revaluation dollars
History of TORF Accounts
2018-2021
CDs in FNB, RCU and Westconsin (WCU)
FNB CD cashed in and placed in FNB money market but not called designated funds
CDs at WCU (Building)and RCU (Recycling)
2022--RCU CDs cashed in and all dollars placed in FNBRF money market
Designated funds—highway equipment, capital outlay, future facilities, contingency,
revaluation
2023-Designated funds pulled out of FNBRF MM and placed in RCU as CDs
Building, capital outlay, cemetery, future facilities, highway equipment, revaluation
2025-Cashed in RCU CDs and placed in public entity account to maximize interest
$297,589.62 as of 2/28/25
CD Transfer to Entity Acct 2/2025
Building $ 22,212.82 2/28/25
Capital Outlay $ 53,242.17 2/19/25
Cemetery $ 15,972.66 2/19/25
Future Facilities $ 87,589.74 2/19/25
Highway Equipment $ 106,484.29 2/19/25
Revaluation $ 10,648.44 2/19/25
Recycling 8/18/25 $ 11,864.44 8/18/25
Revaluation dollars in public entity account:
Revaluation CD $10,648.44 on 2/19/25
February 2/17/25 Treasurer’s report—note to transfer $10,000 (2025 budgeted amount) from FNBRF
money market to RCU account—CD or entity account discussion—changed the report line to
$20,000—no check was written to complete transfer from MM to public entity account
Decision to open public entity account at 2/17/25 board meeting
August 2025—check written to transfer $10,000 where I noted an another $10,000
“Balance” for revaluation within RCU account is ~$20,648.44 (2024 CD plus 2025 $10,000)
Zoning Report Nov 17 – Dec 1, 2025
11/19 W9727 770th Ave. – Issued building permit for a 44’x48’ agricultural storage building to
James Pestorious. Est Cost - $40,000.
11/30 W8374 770th Ave. – Issued building permit for a 28’x36’ addition to an agricultural
storage building to Thomas Dawald. Est Cost - $20,000.
TOWN OF RIVER FALLS, WI
NEEDS ASSESSMENT AND IMPACT FEE UPDATE
November 25, 2025
Prepared for:
Town of River Falls, WI
Prepared by:
Angela Popenhagen P.E., Senior Project
Manager
Project Number:
193807569
The conclusions in the Report titled “Needs Assessment and Impact Fee Update” are Stantec’s
professional opinion, as of the time of the Report, and concerning the scope described in the Report. The
opinions in the document are based on conditions and information existing at the time the scope of work
was conducted and do not take into account any subsequent changes. The Report relates solely to the
specific project for which Stantec was retained and the stated purpose for which the Report was
prepared. The Report is not to be used or relied on for any variation or extension of the project, or for any
other project or purpose, and any unauthorized use or reliance is at the recipient’s own risk.
Stantec has assumed all information received from Town of River Falls, WI (the “Client”) and third parties
in the preparation of the Report to be correct. While Stantec has exercised a customary level of judgm ent
or due diligence in the use of such information, Stantec assumes no responsibility for the consequences
of any error or omission contained therein.
This Report is intended solely for use by the Client in accordance with Stantec’s contract with the Client.
While the Report may be provided by the Client to applicable authorities having jurisdiction and to other
third parties in connection with the project, Stantec disclaims any legal duty based upon warranty,
reliance or any other theory to any third party, and will not be liable to such third party for any damages or
losses of any kind that may result.
Prepared by:
Signature
Angela Popenhagen, P.E.
Printed Name
Reviewed by:
Signature
Printed Name
Approved by:
Signature
Printed Name
Project Number: 193807569
iii
Table of Contents
EXECUTIVE SUMMARY .................................................................................... ...................... IV
1 INTRODUCTION ......................................................................................... .................. 1
1.1 Introduction .................................................................................................................................... 1
1.2 Background ................................................................................................................................... 2
1.3 Summary ....................................................................................................................................... 2
2 POPULATION AND PROJECTED GROWTH ANALYSIS ........................................... 4
2.1 Introduction .................................................................................................................................... 4
3 PUBLIC WORKS FACILITY NEEDS ASSESSMENT ................................................... 6
3.1 Inventory of Existing Conditions and Identification of Future Needs ............................................. 6
3.2 Public Works Facility Impact Fee .................................................................................................. 7
4 ROADWAY NEEDS ASSESSMENT ............................................................................. 8
4.1 Inventory of Existing Conditions and Identification of Future Needs ............................................. 8
4.2 Roadway Impact Fee ..................................................................................................................... 8
5 RECOMMENDED FEES AND IMPLEMENTATION .................................................... 10
5.1 Summary ..................................................................................................................................... 10
5.2 Recommended Impact Fee Schedule ......................................................................................... 10
5.3 Impact on the Availability of Affordable Housing ......................................................................... 11
5.4 Enacting the Impact Fee Ordinance ............................................................................................ 12
5.5 Imposition and Collection of Fees ............................................................................................... 12
5.6 Managing Impact Fees ................................................................................................................ 13
5.7 Periodic Review ........................................................................................................................... 13
LIST OF TABLES
Table 1: Recommended Impact Fees .......................................................................................................... iv
Table 2: Population and Housing Projections ............................................................................................... 4
Table 3: Public Works Facility Impact Fee .................................................................................................... 7
Table 4: Roadway Impact Fee ...................................................................................................................... 9
Table 5: Recommended Impact Fees ......................................................................................................... 10
Table 6: Effect of Impact Fee on Affordable Housing ................................................................................. 11
APPENDIX A ROADWAY EXPANSION COSTS .................................................................. 14
Project Number: 193807569
iv
Executive Summary
The Town of River Falls suspended their impact fee on October 20, 2025 given the project was complete.
The Town decided to revisit other areas for consideration as well as updating them to reflect amendments
and clarifications to the Wisconsin impact fee laws and updated population projections. The Town hired
Stantec to update the needs assessment and impact f ee to comply with current law and current
population and growth projections. This data was used to calculate the maximum amount for impact fee
rates for the Town. The Town Board, at their discretion, may adopt a lower amount than calculated.
In the state of Wisconsin, impact fees can be used for the following public facilities:
• Highways, as defined in s. 340.01 (22),
• Facilities for collecting and treating sewage,
• Facilities for collecting and treating storm and s urface waters,
• Facilities for pumping, storing, and distributing water,
• Parks, Playground and land for athletic fields
• Solid waste and recycling facilities,
• Fire protection facilities,
• Law enforcement facilities
• Emergency medical facilities, and
• Libraries.
This report updates the impact fees to satisfy the requirements of Wisconsin State Statute §66.0617. The
calculations properly allocate the capital costs for the facilities between existing development and n ew
development and used as the basis for the recommend ed impact fees. The impact fees imposed shall be
increased annually by an inflationary factor to make the fees more equitable in that the amount paid by
any new development is approximately equal to the a mount paid in any other year. Fees may be adjusted
by the annual increase in an inflation index such as the U.S. Census Bureau Construction Price Index
(CPI) for single-family houses under construction or the Engineering News Record Construction Cost
Index, for the twelve-month period of the prior year, with the adjustment effective January 1 of each year.
Table 1: Recommended Impact Fees
Recommended Impact Fee
Public Works Impact Fee $7,500
Roadway Impact Fee $8,801
TOTAL $16,301
Needs Assessment and Impact Fee Update
Introduction
Project Number: 193807569
1
1 Introduction
1.1 Introduction
Impact fees are financial contributions imposed by communities to pay for capital improvements within the
community, which are necessary to serve or accommod ate new development.
State Statutes require that any municipality that imposes impact fees must have a sound basis of analy sis
to support the imposed fee. This means that you have accurate data on the Town’s growth patterns and
infrastructure needs due to development to provide the information necessary to support the final impact
fees. State law requires that impact fees must bear a rational relationship to the need for new, expan ded
or improved public facilities. This means that the amount of the impact fee should be based on a
reasonable estimate of the demand that a new develo pment will create for public facilities.
State law also dictates that impact fees cannot exceed the proportionate share of the capital costs
required to serve new development as compared to ex isting development. Each facility must be analyzed
to determine the share of the facility that is needed to provide the established service level to the existing
development versus the excess facility space that is available to serve new development. The same
service level should be applied to both existing and new development when determining if there is a
portion of facilities that are needed to provide the desired service level to existing development.
The Needs Assessment and associated impact fees mus t meet the following criteria:
• Maintain a rational relationship to the need for n ew, expanded or improved public facilities that
are required to serve land development.
• Cannot exceed the proportionate share of the capit al costs that are required to serve land
development, as compared to existing uses of land within the municipality.
• Be based upon actual capital costs or reasonable e stimates of capital costs for new, expanded or
improved public facilities.
• Be reduced to compensate for other capital costs i mposed by the municipality with respect to land
development to provide or pay for public facilities, including special assessments, special
charges, land dedications or fees in lieu of land dedications under Ch. 236 or any other items of
value.
• Be reduced to compensate for monies received from the federal or state government specifically
to provide or pay for the public facilities for which the impact fees are imposed.
• Cannot include amounts necessary to address existi ng deficiencies in public facilities.
• Be payable by the developer or the property owner to the municipality in full upon issuance of a
building permit by the municipality.
• May be held for 8 years after they are collected, or in the case of impact fees that are collected
for capital costs related to lift stations or sewage treatment, 10 years from the time collected plus
3 years longer if the municipality finds due to extenuating circumstances or hardship a longer time
to hold the impact fees is needed.
Needs Assessment and Impact Fee Update
Introduction
Project Number: 193807569
2
In the state of Wisconsin, impact fees can be used for the following public facilities:
• Highways, as defined in s. 340.01 (22),
• Facilities for collecting and treating sewage,
• Facilities for collecting and treating storm and s urface waters,
• Facilities for pumping, storing, and distributing water,
• Parks, playgrounds and land for athletic fields,
• Solid waste and recycling facilities,
• Fire protection facilities,
• Law enforcement facilities,
• Emergency medical facilities, and
• Libraries.
1.2 Background
The Town of River Falls is expecting population growth and commercial and industrial development in th e
future. The existing Needs Assessment was last updated in 2006 for the purpose of purchasing land for a
new Town shop. This endeavor has been completed. Th e Town expects that growth pressures will
continue given the proximity to the City of River Falls and the Twin Cities metropolitan area. This pattern
of growth will continue to place additional stress on the existing town facilities, including the town shop
(public works facility) and roadways.
As the cost of providing services and infrastructure continues to increase along with the pressure to
control property taxes, impact fees provide an equitable means for both existing and new development t o
pay for portions of public infrastructure projects. Wisconsin Statutes 66.0617 with revisions from 20 05
Wisconsin Act 477, 2005 Wisconsin Act 203, and 2007 Wisconsin Act 44 allows local governments to
charge impact fees for public improvements. These fees can be used to recover costs to construct,
expand, or improve public facilities necessary to accommodate land development and to maintain current
levels of service within the Town.
The Town has retained Stantec to update the Public Facilities Needs Assessment and Impact Fees. The
study included evaluating a Public Works Facility and Roadway impact fees.
This report updates the impact fees to satisfy the requirements of Wisconsin State Statute §66.0617. The
calculations properly allocate the capital costs for the facilities between existing development and n ew
development and used as the basis for the recommend ed impact fees.
1.3 Summary
Wisconsin impact fee law contains specific requirements for the process of adopting or amending an
impact fee ordinance, for determining the amount that can be charged for an impact fee, and for
managing and spending impact fee revenues. Impact f ees may only be used to fund capital costs of
public facilities, which are defined as the cost to construct, expand or improve public facilities. Eligible
costs may include land, legal, planning, engineering and design costs. The amounts calculated in this
report are the maximum amounts that may be charged for impact fees. The Town Board, at their
Needs Assessment and Impact Fee Update
Introduction
Project Number: 193807569
3
discretion, may adopt a lower amount than calculated. The impact fees imposed shall be increased
annually by an inflationary factor to make the fees more equitable in that the amount paid by any new
development is approximately equal to the amount pa id in any other year. Fees may be adjusted by the
annual increase in an inflation index such as the U.S. Census Bureau Construction Price Index (CPI) fo r
single-family houses under construction or the Engineering News Record Construction Cost Index, for th e
twelve-month period of the prior year, with the adjustment effective January 1 of each year.
Impact fees may not be used for operation and maintenance costs or to correct existing deficiencies in
the public facilities for which they are imposed. Existing deficiencies may include:
• Facilities or portions of facilities that need to be replaced due to age or obsolescence.
• Improvements made to existing facilities to meet s tate or federal requirements or utilize improved
technology.
• Facilities or portions of facilities that result i n an improved design standard, or the difference
between the future design standard, as it would apply to current population, and the actual
existing facility.
The impact fee will be based on Equivalent Residential Unit (ERU). Thus, the fee relates to the “ impact ”
each user has on the public infrastructure system.
Needs Assessment and Impact Fee Update
Population and Projected Growth Analysis
Project Number: 193807569
4
2 Population and Projected Growth Analysis
2.1 Introduction
An important element in determining appropriate impact fees is projecting the amount of future
development that will occur in the Town during the selected planning period. These projections are
important for planning for the facilities needed to serve new development as well as calculating the
proportionate cost of facilities per unit of development.
The 2020 Census data and projection data through the Wisconsin Department of Administration (WiDOA)
is available. This information will be used as a basis for the analysis; however, current population
projection does not follow the trend seen in the final 2025 estimate and the number of building permits
received by the Town over the past 5 years. We have found that state projections don’t always reflect
what local knowledge might know. Table 2 shows popu lation and household population from the 2020
U.S. Census Bureau along with the 0.90% increase pe r the final 2025 estimate per the WiDOA.
Table 2: Population and Housing Projections
2020 Population 2,215
2020 Households (Per Comp Plan 2021 Housing count) 864
2025 Final Estimate 1 2,235
2030 Projected Population 1 (With 0.90% increase) 2,255
2030 Projected Households 2 (With 0.90% increase) 881
2020-2030 Additional Population (2,255-2,215) 40
2020-2030 Additional Households (881-864) 17
2040 Projected Population (With 0.90% increase) 2,2 95
2040 Projected Households 2 (With 0.90% increase) 896
2020-2040 Additional Population (2,295-2,215) 80
2020-2040 Additional Households (896-864) 32
2050 Projected Population (With 0.90% increase) 2,3 35
2050 Projected Households 2 (With 0.90% increase) 912
2020-2050 Additional Population (2,335-2,215) 120
2020-2050 Additional Households (912-864) 48
1 The final 2025 estimate is a 0.90% increase vs. the calculated 4.7% decrease per Census estimates.
2 Housing projections calculated based on the estimation of 2.56 people per household as per current
conditions; however, this is higher than the state average of 2.39 to 2.43 people per household.
These projections are important for planning for the facilities needed to serve new development as well as
calculating the proportionate cost of facilities per unit of development. Also important is anticipate d
commercial/industrial development. Per the Town’s Comprehensive Plan, it does not identify any increas e
in commercial/industrial property; however, there exists undeveloped commercial/industrial land. Given
the unknown uses and timing, we have not factored i n these properties when performing our analysis.
Needs Assessment and Impact Fee Update
Population and Projected Growth Analysis
Project Number: 193807569
5
If commercial/industrial development including non-profit uses such as churches, schools, and
government buildings, does occur, this development will be converted to Equivalent Residential Units
(ERU’s) and impact fees should be imposed.
Needs Assessment and Impact Fee Update
Public Works Facility Needs Assessment
Project Number: 193807569
6
3 Public Works Facility Needs Assessment
3.1 Inventory of Existing Conditions and Identification of Future
Needs
The Town Public Works Department provides road main tenance services to all roads owned by the Town
of River Falls. The current public works facility is overcapacity (i.e. equipment does not fit within the
buildings) with the current inventory of equipment and vehicles as of 2025. Because there are no natio nal
or industry standards for determining appropriate amounts of space for public works vehicles and
equipment for a Town of this size, the expansion will be determined by the town. The current Public
Works garage, salt shed, and cold storage is approximately 4,000 sf.
The Town has started to plan for a public works facility that is anticipated to be 7,000 sf (estimating a
70’x100’ garage).
A majority of the town’s public work’s operations will move to the proposed building; therefore, the cost
attributed to new development will only be an increase in building size from the existing 4,000 sf to the
proposed 7,000 sf.
The allocation of future improvements between existing and future development is based on the
difference between the current and projected future need. The existing facilities include a 1,550 square
foot public works garage, a 950 square foot salt shed, and a 1,500 square foot cold storage building. The
4,000 square feet of existing transportation facilities were able to contain vehicles and equipment in 2020;
however, all usable space being allocated towards serving the existing population per the 2020 census
and no room for future growth. From 2020 to 2025, additional equipment was purchased and no longer fit
within the existing facility. As future development occurs, new space will need to be provided to store the
equipment necessary to service a larger area and population. The future facility will provide this space by
creating 7,000 square feet of Town garage space. Because the existing population was served with the
existing facility through 2020, the new additional space within the facility can be attributed to the needs of
future development.
Needs Assessment and Impact Fee Update
Public Works Facility Needs Assessment
Project Number: 193807569
7
3.2 Public Works Facility Impact Fee
Anticipating a 4,900 sf (70’x70’) building and the existing population’s need for 4,000 sf of space, the
remaining 900 sf would be attributed to new development. The calculations below reflect the impact on
new development.
Total Size/Cost of the Public Works Facility: 7, 000 sf x $120/sf = $840,000
Minus Existing Population’s Portion: 4,000 sf x $120/sf = $480,000
TOTAL SIZE/COST ATTRIBUTED TO NEW DEVELOPMENT: 3 ,000 sf x $120/sf = $360,000
Table 3: Public Works Facility Impact Fee
Total Estimated Expansion Cost $360 ,000
2020-2050 Additional Residential Units 48
Impact Fee per REU $ 7,500
The impact fee for the public works facility is $7,500 per residential unit.
Needs Assessment and Impact Fee Update
Roadway Needs Assessment
Project Number: 193807569
8
4 Roadway Needs Assessment
4.1 Inventory of Existing Conditions and Identification of Future
Needs
A transportation plan is incorporated into the Town of River Falls’s Comprehensive Plan. It shows all
existing roads and their proposed functional classifications. The functional classification of a roadway is
based on the standard guidelines of the Wisconsin Department of Transportation’s Facilities Developmen t
Manual (FDM).
All roads within the town that are eligible for impact fees are currently classified as local roadways. To
safely accommodate the projected increased traffic and provide a reasonable level of service, the
roadways may need to be expanded in width, depth of road section or addition of turn lanes. The
proposed roads are listed below; however, please no te that this list of roadways is not meant to be
exclusive. Development may occur along other roadwa ys within the Town which may require the
improvement of those roadways to accommodate new development. Any impact fees ultimately approved
by ordinance passed by the Town Board based on this Needs Assessment shall therefore also apply to
development along any such unlisted roadways. The p roposed roads are:
• 690 th Avenue from CTH E to 950th St (1.97 miles)
• 830 th Avenue from 850 th Street to 770 th St (0.84 miles)
• 850 th Street from STH 29 to 830 th Ave (0.42 miles)
Based on current traffic volumes, the existing Town roads are adequate to meet the current traffic levels.
However, additional traffic generated by expected growth will affect the level of service and traffic patterns
of these roadways. Therefore, improvements to these roadways will be necessary to adequately serve
the increase in traffic caused by new development. For cost estimating purposes, we anticipated the
widening of the roadways by 2 feet. This is consistent Trans 204 width requirement for increased traff ic.
4.2 Roadway Impact Fee
Roadway impact fees for residential development are imposed on each new residential unit, or residential
equivalent unit (REU) based on a typical trip generation rate for single family homes. If denser housing
such as duplexes, townhomes, apartments, etc. or co mmercial/industrial development does occur,
associated typical trip generation rates for each of those uses are assigned
Cost estimates have been prepared to expand roads f rom current road width by 2 feet. Other
improvements such as an increase in asphalt depth a nd/or turn lanes could also be considered when
determining the correct application required. The cost estimates are based on recent bids for roadway
reconstruction projects in western Wisconsin. The i mpact fees are spread over the anticipated life of 30-
years for a roadway. The impact fee for roads is shown below.
Needs Assessment and Impact Fee Update
Roadway Needs Assessment
Project Number: 193807569
9
Table 4: Roadway Impact Fee
Total Estimated Expansion Cost $422,491
2020-2050 Additional Residential Units 48
Impact Fee per REU $ 8,801
The impact fee for Roadways is recommended to be $8,801 per Residential ERU.
Needs Assessment and Impact Fee Update
Recommended Fees and Implementation
Project Number: 193807569
10
5 Recommended Fees and Implementation
5.1 Summary
The purpose of this study was to analyze and update the impact fees for the Town of River Falls. The
report fulfills the public facilities needs assessment procedural requirement under Wisconsin Statutes
§66.0617.
In order to determine the appropriate amount of the fees, the following analysis was carried out:
• Population and housing projections were reviewed a nd determined based on the 2020 Census
data and the 2025 Estimated Population along with Town knowledge of building permits over the
past 5 years.
• Existing Public Works Facility inventory and capac ity versus the proposed facility size erroring on
the small size.
• Review of roadway improvements where development i s anticipated.
• Costs of recommended projects allocated to the pro portionate share of facilities that are needed
to serve new development over a 30-year planning period.
• Fees were calculated based on the analysis in the previous steps.
5.2 Recommended Impact Fee Schedule
Based on the analyses described above, this study recommends that the Town revise its impact fee
ordinance and impose impact fees for facilities as shown in the table below. These amounts recommend
the maximum amount that the Town could impose, base d on the application of Wisconsin Statutes
66.0617. The Town may choose to impose a lesser amo unt as a matter of policy.
Table 5: Recommended Impact Fees
Equiv. Residential
Unit (ERU)
Public Works Facility Impact Fee $7,500
Roadway Impact Fee $8,801
TOTAL $16,301
Needs Assessment and Impact Fee Update
Recommended Fees and Implementation
Project Number: 193807569
11
5.3 Impact on the Availability of Affordable Housing
One of the requirements of Wisconsin Statute §66.0617 is to estimate the cumulative effect of all
proposed and existing impact fees on the availability of affordable housing within the municipality.
Although the fees are similar to the fees from the previous needs assessment, they may have an effect
on affordability to those in the low-income brackets. The Town may wish to reduce or waive the impact
fees for those units that can prove low-income benefit.
Per Table 5, the total impact fee for each REU is $16,301. The following table outlines the effect of this
fee on affordable housing based on a mortgage for a median home value in River Falls of $375,000 and a
median household income of $78,078, assuming the en tire cost of the fees is added to the home price.
For a 30-year mortgage at 7.5% interest rate, adding the impact fee results in roughly 1.8 percent
increase of household income that goes towards housing – from 52.2% of median household income to
54.0% of median household income. For lower cost h ousing and lower income households, the fees
would be a proportionally larger share of the home price and the household income. See calculations i n
the following table.
Table 6: Effect of Impact Fee on Affordable Housing
Median House Value $375 ,000
Median Household Income $78,078
Annual Cost of Housing:
Annual Mortgage Payment $31, 752 30 years @ 7.5 %
Estimated Property Taxes $7,000
Estimated Insurance $2, 000
Total Payment $40,752
Proposed Impact Fee $16,301
Median Housing Value + Impact Fee $391,301
Annual Mortgage Payment w/Impact Fee $33,132 30 years @ 7.5 %
Total Payment incl taxes and insurance (T/I) $42,132
Mortgage Payment as % of Income 52.2 %
Mortgage Payment + impact fee as % of income 54.0 %
Increase in % of income for housing 1. 8%
Needs Assessment and Impact Fee Update
Recommended Fees and Implementation
Project Number: 193807569
12
5.4 Enacting the Impact Fee Ordinance
Prior to amending a local ordinance to update impact fees on new development, a municipality must
comply with the following procedural requirements:
1. Prepare a needs assessment for the public facili ties for which it is anticipated that impact fees
may be imposed. The public facilities needs assessm ent shall include the following:
a. An inventory of existing public facilities, incl uding identification of any existing deficiencies
in those public facilities, for which it is anticipated that an impact fee may be imposed.
b. An identification of new, improved or expanded p ublic facilities that will be required
because of new development, or the identification of excess capacity in existing public
facilities that are used by new development. This shall be based upon an explicit level of
service and standards.
c. A detailed estimate of the capital costs of prov iding or constructing the new, improved or
expanded public facilities, including an estimate of the cumulative effect of all proposed
and existing impact fees on the availability of affordable housing within the municipality.
2. Hold a public hearing prior to enacting or amend ing an ordinance to impose impact fees. The
public facilities needs assessment must be available for public review for at least 20 days before
the date of the hearing.
To implement the recommendations contained in this report and amend the impact fee ordinance in the
Town of River Falls, the following remaining steps must be taken:
• Present the findings of this report to the Town Bo ard.
• Revise the existing impact fee ordinance to includ e the recommended changes to the impact
fees.
• Publish a Class 1 notice in the Town newspaper pri or to the public hearing as required under
Wisconsin Statutes §66.0617(3). The needs assessmen t must be available for public inspection
and copying at least 20 days prior to the public hearing as required under Wisconsin Statutes
§66.0617(4)(b).
• Conduct a public hearing prior to amending the imp act fee ordinance.
• After the public hearing, the Town Board may adopt the amended impact fee ordinance as
recommended or adopt it with additional amendments.
5.5 Imposition and Collection of Fees
Impact fees may be imposed when a building permit is requested for developing land, where
development is defined as the creation of additional residential dwelling units or nonresidential uses that
create the need for new, expanded or improved public facilities. In other words, development can mean
the construction of a new residential or nonresidential building, or the expansion or remodeling of an
existing residential or non-residential building that results in a use that requires a higher demand for
public services than the previous use.
Needs Assessment and Impact Fee Update
Recommended Fees and Implementation
Project Number: 193807569
13
5.6 Managing Impact Fees
Impact fees must be placed into segregated accounts, meaning each type of fee has its own account.
The impact fees and any interest earned on the account balance must be expended only for the facilities
for which the fees have been imposed. Impact fees may be used to pay directly for project costs or may
be used to pay for the debt service on bonds issued to finance a capital project.
To ensure that impact fees are not used to pay for more than the proportionate share of capital costs for
facilities needed to serve new development, the pub lic facilities needs assessment should be referenced
when determining the amount of impact fee revenues to apply to facility funding. If a project is modified
from what is detailed in the needs assessment, it may be necessary to review and update the needs
assessment and impact fee ordinance.
Impact fees that are collected but are not used within 7 years after collection must be refunded to the
property owner at the time of refund for which the impact fee was imposed.
It is recommended that the Town continue to take the following steps to ensure that impact fees are
expended within the statutory time limits and that fees are properly applied to the projects shown in the
public facilities needs assessment:
• Maintain a spreadsheet or other list of the amount s collected, showing the date paid, tax key,
property owner, number of units, fee per unit, and total amount paid for each type of fee.
• Maintain a spreadsheet showing the projects funded through impact fees, by type of fee. At a
minimum, it should show the year of the project, a brief description, total cost (including
construction and legal, engineering, etc), the amount cash financed from impact fees, the amount
borrowed, a debt service schedule and the share of debt service to be paid from impact fees.
Ideally, this spreadsheet would also be linked to a sheet showing the balance of impact fee funds
by account, showing payments made from each impact fee fund for cash financing and debt
service payments.
5.7 Periodic Review
The impact fees imposed shall be increased annually by an inflationary factor to make the fees more
equitable in that the amount paid by any new development is approximately equal to the amount paid in
any other year. Fees may be adjusted by the annual increase in an inflation index such as the U.S.
Census Bureau Construction Price Index (CPI) for single-family houses under construction or the
Engineering News Record Construction Cost Index, fo r the twelve-month period of the prior year, with the
adjustment effective January 1 of each year.
The impact fees calculated in this report were based on numerous assumptions and forecasts about
future development and service levels provided by the Town. The exact specifications of public facilities’
design and costs may vary from the estimates develo ped through the analysis of this report. Therefore, it
is recommended that the impact fees be reviewed on a consistent basis to adjust for changes in inflation,
development trends or major changes in project plans, ideally on a schedule of every three to five years.
Costs based on bids from road reconstruction projects in western Wisconsin, 2025
Item Unit Quantity Unit Price Total Price
Common Excavation CY 2312 $10.00 $23,116
Granular Fill TN 5263 $15.00 $78,951
8" Aggregate Base TN 1191 $15.00 $17,864
Shouldering TN 595 $45.00 $26,796
Storm culvert extension LF 92 $100.00 $9,154
Erosion Control LF 10402 $3.00 $31,206
Restoration SY 9246 $4.00 $36,985
Subtotal $224,071
15% Contingency, Engineering and Admin $33,611
TOTAL ESTIMATED 690TH AVE COST $257,681
Item Unit Quantity Unit Price Total Price
Common Excavation CY 986 $10.00 $9,856
Granular Fill TN 2244 $15.00 $33,662
8" Aggregate Base TN 508 $15.00 $7,616
Shouldering TN 254 $45.00 $11,425
Storm culvert extension LF 39 $100.00 $3,903
Erosion Control LF 4435 $3.00 $13,305
Restoration SY 3942 $4.00 $15,769
Subtotal $95,535
15% Contingency, Engineering and Admin $14,330
TOTAL ESTIMATED 830TH AVE COST $109,865
Item Unit Quantity Unit Price Total Price
Common Excavation CY 493 $10.00 $4,929
Granular Fill TN 1122 $15.00 $16,835
8" Aggregate Base TN 254 $15.00 $3,809
Shouldering TN 127 $45.00 $5,714
Storm culvert extension LF 20 $100.00 $1,952
Erosion Control LF 2218 $3.00 $6,654
Restoration SY 1972 $4.00 $7,886
Subtotal $47,778
15% Contingency, Engineering and Admin $7,167
TOTAL ESTIMATED 850TH ST COST $54,945
TOTAL EXPANSION COST OF EXISTING ROADWAYS $422,491
STH 29 TO 830TH AVE
Local Roadway
2,218 L.F. / 0.42 miles
Local Roadway
4,435 L.F. / 0.84 miles
830TH AVENUE
830TH ST TO 770TH ST
850TH STREET
APPENDIX A - ROADWAY EXPANSION COSTS
690TH AVENUE
CTH E TO 950TH ST
Local Roadway
10,402 L.F. / 1.97 miles
From: Town of River Falls Chair
To: torf.sup1@gmail.com; torf.sup2@gmail.com; torf.sup3@gmail.com; TORF SUP4; torf.treasurer@gmail.com;
clerk@riverfallstown.com
Subject: Fw: [External Mail] RE: River Falls EMS
Date: Monday, November 24, 2025 5:39:19 PM
Attachments: image001.png
Here is the reply I received from Assistant City Administrator Jason Rohloff.
Item 7 that I had questions on , Now they want that to remain in the contract, that
language was in the last contract, it didn't seem to affect anything so give it thoughts for
Monday night.
From: Jason Rohloff <jrohloff@RFCITY.ORG>
Sent: Friday, November 21, 2025 7:55 AM
To: torf.chair@gmail.com <torf.chair@gmail.com>
Subject: FW: [External Mail] RE: River Falls EMS
Hi Terry,
Kevin Miller from Allina got back to me and outlined the following below.
Let me know if you have any additional questions.
Jason Rohloff | Assistant to the City Administrator
City of River Falls
222 Lewis Street | River Falls, WI | 54022
(715) 426-3432 (direct) | www.rfcity.org
From: Miller, Kevin R <kevin.miller@allina.com>
Sent: Thursday, November 20, 2025 5:35 PM
To: Jason Rohloff <jrohloff@RFCITY.ORG>
Subject: RE: [External Mail] RE: River Falls EMS
** CAUTION: This email originated from outside of the organization. Do not click links or
open attachments unless you recognize the sender and know the content is safe. **
Hi Jason,
I hope the following answers your question:
The Fee Schedule is listed below. We know these fees are in the middle of the
market. Please convey that these fees are the gross charges. In the medical billing
world, we rarely collect our gross charge.
Here is how our feed has added up. Through October, Allina has billed out
$6,329,670 in charges, and those charges have been reduced by payors such as
Medicare and Medicaid by $4,199,947, leaving $2,129,723 in net revenue. That is a
33.6-cent return for every dollar billed. Our net revenue was reduced further by
$207,265 for bad debt. The revenue does not include the per capita fee, grant
dollars, or some intercompany dollars we get for helping Hastings at Regina for
Mutual Aid.
Once all expenses have been taken, all our revenue is accounted for as of our
October Close, the cost center is $23,581 in the positive. However, if we factor in
the Capital spent in River Falls over 2025, we are below water by about $100k.
This is much better than 2024, where the RF operation was over 500k below
water.
The per capita increase was essential to help offset these losses. I’m happy to
answer any questions regarding our cost structure, wages, and spending. Allina
EMS is not profiting from the activity. With the hospital in your community, we
are a health system that looks at more than one area of performance to support
our community. This is a strong level of support, and we are unwavering in that
commitment.
Ambulance fees:
Emergency 911 paramedic level response and transport - $2,890. Mileage is
$49.86. Average actual collection is $280–$490 for governmental payors (we can’t
bill the patient for the remaining balance).
Non-emergent paramedic level response and transport is $1,870. These would
involve moving a patient requiring a higher level of care from River Falls Hospital
to United Hospital or another definitive care location. Mileage charge is $ 27.54
I have a list of charges for other, less common services if you would like them,
such as basic life support transport (two EMT staff, no paramedic), critical care,
and high-acuity advanced-level treatments on a 911 call.
What’s driving cost increases? Poor reimbursements across all areas of
healthcare. Bad debt, capitated payments, mandatory write-offs, and high patient
deductibles resulting in bad debt. A new, fully equipped ambulance costs $340k
and is expensive to maintain. Benefit costs are an additional 30% over salaries,
and we’re competing with the MN metro wage market. Our EMT and Paramedic
staff are well paid!
Regarding Troy, yes, we have a final document for them, and the per capita fee is
$25. The number of those in the area has decreased since 2024, as the dividing
line between our and Lakeview’s operations has changed. The document is
awaiting final legal review. The document is identical to our agreement with River
Falls. It does not change our operation in any manner as we operate today. We
are not posting an ambulance in Troy; instead, we are operating the entire
response area as one, just as we have today.
I hope this helps answer your questions. Again, I would be happy to meet with
any of your or the township's elected officials.
Best wishes,
Kevin Miller
Director of Operations
Allina Health, EMS
651-328-0071 Cell
AGREEMENT FOR AMBULANCE SERVICE
THIS AGREEMENT FOR AMBULANCE SERVICE (“Agreement”), is made and entered
into effective the 1st day of January, 2026, by and between the City of River Falls, a Wisconsin
municipal corporation (“City”), and the Town of River Falls, Wisconsin (“Town”).
WHEREAS, the City, through the contracting of a non-governmental emergency medical
services organization (“EMS Contractor”), provides an emergency medical ambulance service in
the City; and
WHEREAS, the Town wish es to contract with the City to ensure the provision of
ambulance services to town residents; and
WHEREAS, the Town is desirous of receiving emergency medical ambulance services
during calendar years 2026-2030 and the Town has an obligation under Section 60.565, Wisconsin
Statutes, to contract for or to operate ambulance service for its residents. Emergency medical
ambulance service is understood to be the resources used to deliver medical care and
transportation to those with an unpredicted immediate need outside a hospital or other medical
facility.
NOW, THEREFORE , it is mutually agreed between the parties to this A greement as
follows:
1. The EMS Contractor shall, consistent with this Agreement and the agreement between
the City and EMS Contractor, provide regular emergency medical ambulance services
to the entire geographic area of the Town.
2. This Agreement is effective from the 1
st day of January 2026 through December 31,
2030 (the “Initial Term”). As used in this Agreement, January 1 of a calendar year
through December 31 of a calendar year which is part of the Term shall be a “Term
Year”.
3. The Agreement shall be automatically renewed between the City of River Falls and
the Town, for two successive three-year periods (each a “Renewal Term” and together
with the Initial Term, the “Term”), except as follows:
a. On or before June 30 of the last year of the current Term , the City may provide
notice to the Town of its intent not to renew this Agreement.
Agreement for Ambulance Service-2026-2030
Page 2 of 5
b. On or before June 30 of the last year of the current Term, the Town may provide
notice to the City of its intent not to renew this Agreement.
4. ASSESSMENTS. The Town agrees to assist in funding the ambulance service and
agrees to pay an annual per capita assessment for this purpose. The annual per capita
assessment shall be determined by the boundaries of the Town’s service area.
a. In determining the population for a per capita assessment, annual per capita
assessments for a Term Year shall be based upon the latest population estimates
of the Town, as of June 1 of the year preceding the Term Year, from the Wisconsin
Department of Administration Demographic Service Center, Madison, Wisconsin.
Because the entire Town is included in the service area, the total population
estimate for the preceding year shall be used in the assessment.
b. The annual per capita assessment shall be paid in full on or before March 15 of
each Term Year. Failure to pay the assessment in full by March 15 of each Term
Year shall result in the assessment of a late payment penalty by the City. The
penalty shall be in an amount or percentage established by the City to compensate
for administrative and service costs associated with the late payment. The
imposition of a penalty shall not relieve the Town of its obligation to pay the full
per capita assessment. Continued failure to remit payment, including any penalty,
within a reasonable time as determined by the City may result in additional
penalties or other remedies available to the City under this Agreement or
applicable law.
5. The per capita assessment rate for each Term Year of the Initial Term shall be as
follows:
a. 2026 Term Year - $16.00 per capita
b. 2027 Term Year - $16.60 per capita
c. 2028 Term Year - $17.20 per capita
d. 2029 Term Year- $17.80 per capita
e. 2030 Term Year - $18.40 per capita
6. Per capita rates for each Renewal Term will be provided to the Town prior to March 1
of the last year of the current Term . These rates shall be incorporated into this
Agreement for Ambulance Service-2026-2030
Page 3 of 5
Agreement as an addendum.
7. In addition to the per capita assessment, a fee schedule for base runs, mileage,
procedures and disposable supplies will be established from time to time by the EMS
Contractor, as applicable. In accordance with this fee schedule, individual users of the
service within each jurisdiction shall be billed separately for these fee schedule items.
8. All notices and other communications between the Town and the City related to this
Agreement shall be in writing and may be given in any of the following ways: (i) by
personal delivery, in which case the notice shall be deemed to be given on the date of
personal delivery; (ii) by Federal Express or equivalent nationally or regionally
recognized courier that issues receipts evidencing delivery, in which case the notice
shall be deemed given one day following receipt of such notice by the courier; or (iii)
by U.S. mail, in which case the notice shall be deemed given upon posting the notice
in the mail . Notices shall be given to the respective addresses of the p arties set out
below:
If to Town: Town of River Falls
c/o Town Clerk
W9015 770th Ave.
River Falls, WI 54022
If to City: City of River Falls
c/o City Clerk
222 Lewis Street
River Falls, WI 54022
9. The Town for itself agrees to indemnify and hold City, its officers, contractors,
employees, and agents, employees or contractors harmless from any liability claims,
damages, costs, judgments, or expenses resulting directly or indirectly from any
negligent or willful act, commission, or omission upon the part of said Town, its
agents, employees, or contractors, other than the City or the EMS Contractor, related
to or arising out of services performed by City or EMS Contractor under this
Agreement, any contractual obligation of City to indemnify EMS Contractor on behalf
Agreement for Ambulance Service-2026-2030
Page 4 of 5
of the Town, and against all loss by reason of failure of the Town to fully perform in
any material respect, all obligations under this Agreement. The Town acknowledges
and agrees the City has the authority to require the Town to indemnify and hold EMS
Contractor, and its officers, contractors, employees, and agents, harmless on the terms
set forth in the agreement between the City and the EMS Contractor for the provision
of ambulance and emergency medical services. Notwithstanding anything herein to
the contrary, the Town shall have no obligation to indemnify or hold the City and the
EMS Contractor harmless from liability, claims, damages, costs, judgments, or
expenses related to or arising out of the negligent or willful acts, commissions, or
omissions on the part of the City or the EMS Contractor.
(Signature Page Follows)
Agreement for Ambulance Service-2026-2030
Page 5 of 5
IN WITNESS WHEREOF, the parties have hereunto executed this agreement on the date
opposite their signatures.
CITY OF RIVER FALLS TOWN OF RIVER FALLS
Scot Simpson, City Administrator Terry Kusilek, Town Board Chair
Amy White, City Clerk Sarah Meyer , Town Clerk
2025 Holiday Reception
Dec 15, 2025
6:30-7:30pm
Invited: Board members, Recycling workers, Rob, Dalton, Committee members, Ruth, Election workers
Holiday Bonus Amounts:
Rob: $200
Dalton: $200
Darrell Hubbell: $50
Sarah, Rita, Don: $100
Jerome: $50
Recycling $50
Joe M
Albert
Kaleb
Garrett
Mary M
Chris
Kristin
Greg S
Who is bringing what:
Terry:
Rita: Meatballs
Don: Cheese and Meat Tray
Brad: Absent
Joe: Cookies
Siri: Appetizer
Mary F:
Sarah: Dessert
Register: 1st Nat. BK of RF:Clerk's Checking Account
From 11/17/2025 through 12/01/2025
Sorted by: Date, Type, Number/Ref
Date Number Payee Account Memo PaymentC Deposit Balance
11/17/2025 1323 EFTPS -split- 39-6006086 1,706.96 17,456.81
11/17/2025 28871 Dohrer, Albert S. -split- 141.13 17,315.68
11/17/2025 28872 Flick, Dalton -split- 2,222.06 15,093.62
11/17/2025 28873 Fristad, Christopher -split- 233.14 14,860.48
11/17/2025 28874 Johnson, Kaleb LG -split- 225.52 14,634.96
11/17/2025 28875 Merta (employee), M... -split- 67.08 14,567.88
11/17/2025 28876 Nyquist (employee), ...-split- 82.77 14,485.11
11/17/2025 28877 Schaar Jr., Robert A-split- 2,477.38 12,007.73
11/18/2025 28879 Diana Smith Conservation and Deve... 75.00 11,932.73
Town of River Falls 12/1/2025 11:43 AM
Page 1