8-11-25 Village Board — Minutes
Village of Brooklyn · Green County · 8-11-25 Village Board · meeting of Aug 11, 2025 · Minutes
Open the original document More from Village of Brooklyn
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Village Board Meeting Minutes
August 11, 2025
On August 11, 2025, President Mike Brusberg called the Village Board meeting of the Village of Brooklyn to
order at 6:30 p.m. Trustees present were Mike Gehrmann, David Berland, Dan Olson, Todd Klahn, and
Christian Allen. Trustee Jake Bachim was absent. Also present were Jason Marshall, Deputy Merrick Grumke,
Clerk-Treasurer Linda Kuhlman. Pledge of Allegiance.
Public Comments - Jason Marshall – Ronek couldn’t get out last week to inspect. He will be out there this
week. He’s also here on Stacey’s behalf. She isn’t happy. As a board member, you should hold to a higher
standard. They apologize for the smell while spreading manure. He said there was a certain board member
who called them out by name and the bar name on Facebook, and if someone had a problem with it, go to
them. He didn’t think it was professional. He suggests stopping and thinking before posting. We are in a
farm community. The type of manure they spread, they did in another direction last year and had people
complaining about it. They tried to be clean on the roads. If someone knows what’s going on, try explaining
it first. (Marshall left) Klahn agreed, as a board member, we need to lift up our businesses and not put them
down. Gehrmann said while posting make sure it’s not representative as a board member. It’s one thing
making comments as a person. Brusberg suggested if things get you upset, call him before posting.
President’s report – There’s been a lot of pieces going around about Hotel Street, and in many regards, we
need to be patient. Everyone has good intentions, but in the near term, please go through the board, or ask
staff for questions. When we have meeting, be actively engaged in the discussion. He had four conversations
last week. We’ll get our way through this. We have a good product. We have a good engineer in Strand.
They’ve helped us design a lot of different things within the community. That project, there’s been a lot of
different perspectives, but if we look at the end result, it’s good. They deserve kudos. We hear a lot of
negatives, but they did a really good job with this, and we’ll fine tune with the punchlist. Gehrmann suggested
we do a lessons learned with the engineers; it’s an idea. Brusberg said when there’s a time and place, they
can do that. Klahn came in late, but there were a lot of changes midstream, even before the project started,
to make things better, and to make it better, it’s hard to get everything we wanted. Brusberg said with the
budget, they did everything they could to keep it in budget. Klahn said the contractor did a good job of doing
extras without charging.
Berland made a motion to approve minutes of July 28, 2025. Allen seconded. Motion carried. Klahn
abstained.
South sidewalk on Hotel Street – Brusberg said this was on as a placeholder in case Marshall had something
from the last meeting. He reaffirmed he still needs more time. Brusberg made a motion to get thoughts,
insights and suggestions from Marshall on how to approach Hotel Street, and specifically the sidewalk in
front of his property, no later than Friday, August 22
nd, so we can make a decision at the following board
meeting. Gehrmann seconded. Klahn agreed as long as we give him notice right away. Brusberg asked to
amend motion to give notice to Marshall, whether verbal or written. Motion carried.
Brusberg added we’re all in a position of being called out on the spot. It can happen anywhere. The
important thing about any type of resident contact, complaint or concern, it’s good to be an ear, but you can’t
promise. We need to formalize that, where if they have a complaint/ concern and it’s something they want
the board to listen to and hear out, we need them to send an email or come into the clerk’s office and fill out a
form, so we have documentation of what that is, and it’s not word of mouth. Then we can actually tactically
execute and act on it. Otherwise, we’re presuming at times what their concern might be based on our
anecdotal thoughts and perspectives. So he asks going forward if something like this pops up, refer them to
the clerk’s email, and they can copy you also, or they can go to the clerk’s office and fill out a form. Klahn
agreed we need a written form. Gehrmann said if someone is asking for something, he’s said to come to a
meeting or let them know at the office. He agreed we can’t promise anything. Brusberg also added they can
approach staff and have that similar voice of concern, but that doesn’t include poor behavior. Poor behavior
is not tolerated, and it’s entirely acceptable for staff to remove themselves from the conversation. It gets
nowhere and leads to a defensive result. We can’t have that. Our engineers can’t be abused by the public.
They’re doing a service for this community. They are an extension of our employees, and as such they should
be treated with respect as well. Any future behavior like that will not be tolerated, if they are put on the
defensive. That can be shared with everyone in the community on a go-forward basis. This is not to happen
anymore. Allen assumes we had a situation. Brusberg said we’ve had various situations that have been
glossed over, and it’s now time for a reset. It’s nothing any board member or village employee did incorrectly.
This is now to reset those expectations so we don’t have that happen again.
PSC rate case – Kuhlman reviews water rates every year after the PSC audit, to see if we qualify for a
simplified rate case. For the last few years we have qualified, and we did a rate increase last year. We do
qualify again this year, and it’s a 3% increase this year. Next year we will have some higher water issues
including maintenance on well 2, which is about $100,000. Brusberg asked if it’s grounds for doing a full rate
case. Kuhlman said water and sewer expenses are paid by rates we charge. If you do a long rate case, you’re
subject to the PSC telling you what rate you need to charge. Klahn said we’ve had a tight budget on sewer.
With the new sewer plant coming in, should we increase rates or look at it for this fall. If we have to do this $3
million upgrade, our rates will have to go way up. If we do a little bit this fall, it won’t look so bad in a few
years. Gehrmann said like putting money in the bank. Klahn added or to eat up some of that increase now.
Olson said instead of having a big increase at once, to ramp it up slowly. Brusberg asked if we have loans
expiring. Kuhlman said water we had one expire recently. As we get closer to the project, we will have to do a
rate study. We do have a loan that will be paid off when we start the new one. But we are consistently in the
negative or close. Klahn said look at it this fall to do a rate increase next year. Kuhlman said sewer is not set
by PSC, so the board can make that change. Last sewer increase was about 10 years ago. Klahn said we can
do a 2-3% this fall. Brusberg there’s the PSC rate case, and we want to stay ahead of it so we don’t have to do
a more complex rate case. With sewer it behooves us to look at it. Maybe next meeting we can look at the
water PSC rates, and then in the future look at sewer. Klahn said Income versus expense, when he was on last
time, if we broke even, that was a good year. Kuhlman can pull the study that was done when we did South
Kerch Street. Klahn said 2-3 percent is easier than a 7 percent increase. He thinks we should look into it, so
we’re ready for budget time this fall. Gehrmann agrees. Brusberg if are loans expiring, we have some flex
because of the expiration. We don’t have to take it as high, and there’s a way to grade into that increase.
Allen said people will complain. They already do. Klahn we get hit harder on our sewer regulations from DNR
than some other local communities. Gehrmann said it’s probably a good time to start those discussions, get it
into the newsletter that we’re not choosing to do this but it’s coming and needs to be done. Allen said try to
be transparent on costs and what they are, so people can see that. Brusberg if we’re going to do something
on the sewer side, we should have a public forum. Olson one thing to do is like we do with our taxes, do a
pie chart, so this is how much we spend in chemicals, and testing, etc. People don’t understand how much it
costs to take care of everything at the plant. Berland added we need to make sure they see what we’re
spending is less than what we’re taking in, and here’s what’s coming up, so we either pay for it all at once or a
little at a time. Allen one now, one if we did it all at once when we need the money, and one for what it will be
if tapered up. Brusberg for PSC, bring back to next meeting or first meeting in September; and as it pertains to
sewer, shoot for first meeting in September to have initial look at it, and discuss at second meeting.
Renting parking lot – Kuhlman had a request from someone asking if the board would consider renting out
the parking lot. They didn’t go into details of what they wanted, but asking if it would be a consideration.
Berland said he would be hesitant to rent out a lot we don’t charge for in the first place, and we just built it to
support businesses. He feels blowback will be more significant than any benefit we might derive. Brusberg is
aware they’re looking to do special events. Berland would be more comfortable utilizing the lot at the
community building, because of this lot’s proximity to all the businesses we want to support. Gehrmann said
if someone wanted to do a street fair, it would have to come to the board. He would be nervous setting a
rate for a parking lot. If we have a special event, bring a proposal, and maybe there’s not a fee because it’s
for the community good. Brusberg suggested having them fill out a special event application and bring it to
the board. Klahn it’s too vague to make a decision, but he’s leaning against it. Berland doesn’t disagree. He
doesn’t want to be in the business of renting out parking lots and the blowback from people who want to park
there. Kuhlman will let them know if they want to do something, to fill out the application. Berland loves the
idea of doing something, but we can discuss where to accommodate.
Allen made a motion to approve public works to post no parking signs on N. Kerch Street for the Luke Bryan
concert on September 18. Berland seconded. Motion carried.
Olson had a question about the US Cellular bill. Kuhlman said it is consistently one month behind based on
the due date and when we receive the invoice and can send out the check. Olson made a motion to approve
bills as presented. Klahn seconded. Motion carried.
Clerk’s Report – We have financials. For the month of July we had $326,505.13 in deposits. $50,382.23 was
from July shared revenue payments. We had $142,380 in loan proceeds from the NAN at the business park.
We had a payment go out, so the bank reimburses us for that payment. We are under what we thought that
NAN loan was going to be. Hopefully we’ll have it done by the end of the month. Withdrawals totaled
$673,992.98, with a loan payment of $35,172. Total ending balance in all accounts was $2,406,821.39. She
broke out the One Community Bank accounts on the spreadsheet. We had some phone issues with Charter at
the plant, but are getting them worked out. Field person from Representative Pocan’s office came last
Thursday and met with Brusberg and Kuhlman. They’re available if we need help. We had a lightning strike at
the plant on Sunday which took out a piece of equipment. We will contact the insurance company, but we do
have a $1,000 deductible. Autumn Festival is on September 20 at Legion Park. Berland asked who can
contribute to the newsletter. Kuhlman said pretty much anybody, as long as it’s not an advertisement. We
get information from different sources, and sometimes the information we get comes as a whole page of
events and some of those evens might be over by the time the newsletter goes out. We have some
temporary operator licenses for Labor Day weekend. We had an increase in net new construction, in part due
to O&A’s new building, of 5.27% this year. We received new census information. We have an increase from
2020 of a total of 51 people. It was an increase of 60 in Dane County and decrease of 9 in Green County.
Clerk’s office will be closed Tuesday through Friday next week for annual clerk’s conference. Brusberg asked
about Planning Zoning meeting next week. Kuhlman said it was cancelled. She will let Marshall know we’re
gone next week, but he can drop his information in the drop box. Brusberg added a thanks to all the work
everyone put into Brooklyn Night Out. Thanks to the fire/EMS for doing food. Special thanks to Deputy
Grumke for all his work. The Optimist Club gave Deputy Grumke an award.
Klahn made a motion at 7:19 p.m. to adjourn. Olson seconded. Motion carried.
Linda Kuhlman, WCPC, CMTW; Clerk-Treasurer
Source: Village of Brooklyn website. First collected Oct 11, 2026.