3-24-25 Public Hearing — Agenda packet
Village of Brooklyn · Green County · 3-24-25 Public Hearing · meeting of Mar 24, 2025 · Agenda packets
Open the original document More from Village of Brooklyn
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Section Title Line Item Item Description UofM Quantity Unit Price Extension Unit Price Extension Unit Price Extension
1 8-IN Sanitary Sewer LF 330 $152.25 $50,242.50 $227.00 $74,910.00 $137.00 $45,210.00
2 4-IN Sanitary Sewer Lateral LF 80 $126.00 $10,080.00 $118.00 $9,440.00 $253.00 $20,240.00
3 4-FT-DIA Sanitary Sewer MH W/Casting EA 3 $7,364.00 $22,092.00 $6,800.00 $20,400.00 $8,200.00 $24,600.00
4 Connect to Existing Sanitary MH EA 1 $1,525.00 $1,525.00 $1,150.00 $1,150.00 $12,400.00 $12,400.00
5 Abandon Existing Sanitary Sewer LS 1 $9,000.00 $9,000.00 $7,200.00 $7,200.00 $9,350.00 $9,350.00
6 Existing Sewer Lateral ULO EA 5 $100.00 $500.00 $552.00 $2,760.00 $1,023.00 $5,115.00
7 Sanitary Sewer Granular Trench Backfill LF 330 $0.01 $3.30 $0.01 $3.30 $21.25 $7,012.50
8 8-IN-DIA Water Main LF 345 $158.20 $54,579.00 $153.46 $52,943.70 $151.00 $52,095.00
9 8-IN Valve and Road Box EA 2 $3,799.00 $7,598.00 $3,290.00 $6,580.00 $3,300.00 $6,600.00
10 6-IN Valve and Road Box EA 1 $2,455.00 $2,455.00 $2,820.00 $2,820.00 $2,500.00 $2,500.00
11 1-IN Corporation Stop EA 2 $830.00 $1,660.00 $285.00 $570.00 $1,500.00 $3,000.00
12 1-IN Curb Stop and Box EA 4 $1,133.00 $4,532.00 $450.00 $1,800.00 $1,700.00 $6,800.00
13 1-IN Copper Water Service Laterals LF 330 $78.00 $25,740.00 $62.00 $20,460.00 $115.00 $37,950.00
14 Abandon Existing Water Main LS 1 $8,350.00 $8,350.00 $6,857.00 $6,857.00 $9,095.00 $9,095.00
15 Salvage and Reinstall Existing Aux. Valve and Hydrant LS 1 $3,534.25 $3,534.25 $2,890.00 $2,890.00 $9,956.00 $9,956.00
16 Connect to Existing Water Main EA 3 $2,155.00 $6,465.00 $3,014.00 $9,042.00 $3,500.00 $10,500.00
17 Water Main Granular Trench Backfill LF 345 $0.01 $3.45 $0.01 $3.45 $19.35 $6,675.75
18 12-IN RCP Storm Sewer LF 220 $136.00 $29,920.00 $106.00 $23,320.00 $168.00 $36,960.00
19 Pond Overflow Structure EA 1 $3,155.00 $3,155.00 $3,575.00 $3,575.00 $3,600.00 $3,600.00
20 2-FT by 3-FT Precast Inlet W/ Casting EA 1 $3,610.00 $3,610.00 $3,460.00 $3,460.00 $4,040.00 $4,040.00
21 Connect to Existing Inlet EA 1 $1,150.00 $1,150.00 $1,200.00 $1,200.00 $1,300.00 $1,300.00
22 Detention Basin Common Excavation and Site Grading (EXCL Storm Sewer) LS 1 $9,620.00 $9,620.00 $25,520.00 $25,520.00 $12,000.00 $12,000.00
23 Storm Sewer Granular Trench Backfill LF 220 $0.01 $2.20 $0.01 $2.20 $7.90 $1,738.00
24 Clearing and Grubbing LS 1 $3,150.00 $3,150.00 $3,150.00 $3,150.00 $3,181.50 $3,181.50
25 Site Grading/Common Excavation LS 1 $118,535.00 $118,535.00 $94,000.00 $94,000.00 $100,000.00 $100,000.00
26 EBS CY 690 $27.50 $18,975.00 $19.00 $13,110.00 $19.00 $13,110.00
27 EBS Breaker Run T 1380 $12.80 $17,664.00 $21.00 $28,980.00 $17.00 $23,460.00
28 Geotextile Fabric SY 825 $2.80 $2,310.00 $3.00 $2,475.00 $1.90 $1,567.50
29 Crushed Aggregate Base Course T 2000 $14.90 $29,800.00 $22.00 $44,000.00 $16.00 $32,000.00
30 30-IN Type A Concrete Curb and Gutter LF 1020 $33.25 $33,915.00 $26.00 $26,520.00 $27.12 $27,662.40
31 5-IN Concrete Sidewalk SF 4825 $7.20 $34,740.00 $11.00 $53,075.00 $8.44 $40,723.00
32 5-IN Concrete Terrace SF 1000 $7.10 $7,100.00 $10.00 $10,000.00 $8.44 $8,440.00
33 7-IN Concrete Sidewalk SF 400 $8.40 $3,360.00 $12.00 $4,800.00 $10.43 $4,172.00
34 7-IN Concrete Driveway and Apron SF 290 $8.40 $2,436.00 $11.00 $3,190.00 $10.43 $3,024.70
35 9-IN Concrete Valley Gutter LF 45 $37.70 $1,696.50 $67.00 $3,015.00 $65.65 $2,954.25
36 8-IN Concrete Dumpster Pad EA 1 $3,410.00 $3,410.00 $2,345.00 $2,345.00 $2,620.26 $2,620.26
37 Concrete Stairs and Railing Replacement LS 1 $18,000.00 $18,000.00 $28,950.00 $28,950.00 $16,417.55 $16,417.55
38 Detectable Warning Field SF 20 $48.00 $960.00 $40.00 $800.00 $55.55 $1,111.00
39 Asphaltic Concrete Pavement T 600 $81.00 $48,600.00 $81.00 $48,600.00 $81.00 $48,600.00
40 Asphalt Driveway SF 60 $15.00 $900.00 $15.00 $900.00 $15.00 $900.00
41 Pavement Markings LS 1 $1,700.00 $1,700.00 $8,750.00 $8,750.00 $8,750.00 $8,750.00
42 Site Signage LS 1 $3,145.00 $3,145.00 $1,000.00 $1,000.00 $4,960.00 $4,960.00
43 Downspout Trench Drains W/ Curb Head Insert EA 3 $2,415.00 $7,245.00 $2,732.00 $8,196.00 $3,756.00 $11,268.00
44 Fence Chain Link, Zinc Coated W/Privacy Slats, 6-FT Height LF 46 $109.00 $5,014.00 $109.00 $5,014.00 $109.00 $5,014.00
45 Fence Chain Link, Zinc Coated W/ Privacy Slats, 6-FT Height, 10-FT-Wide Access Gate LS 1 $1,700.00 $1,700.00 $1,700.00 $1,700.00 $1,700.00 $1,700.00
46 Vinyl Privacy Fence, 8-FT Height LF 160 $107.00 $17,120.00 $107.00 $17,120.00 $107.00 $17,120.00
47 Silt Fence LF 910 $2.05 $1,865.50 $2.15 $1,956.50 $3.80 $3,458.00
48 Traffic Control LS 1 $2,500.00 $2,500.00 $6,950.00 $6,950.00 $13,000.00 $13,000.00
49 Dewatering LS 1 $600.00 $600.00 $0.01 $0.01 $0.01 $0.01
50 Tracking Pads EA 2 $750.00 $1,500.00 $765.00 $1,530.00 $850.00 $1,700.00
Hotel Street Reconstruction
Contract 1-2024
Village of Brooklyn, Wisconsin
Solicitor: Strand Associates, Inc.
February 19, 2025 1:30 PM CST
Hotel Street Reconstruction
Speedway Sand & Gravel, Inc. Fischer Excavating, Inc. Rock Road Companies, Inc.
JPS:nb2\R:\MAD\Documents\Specifications\Archive\2025\Brooklyn, Village of (WI)\1605.048.1-2024.JPS\(14) Bid Tabs\Brooklyn.1-2024.Bid
51 Inlet Protection EA 7 $150.00 $1,050.00 $250.00 $1,750.00 $130.00 $910.00
52 Furnish and Install #40 WisDOT Mix W/Mat SY 325 $6.35 $2,063.75 $6.80 $2,210.00 $3.90 $1,267.50
53 Furnish and Install #40 WisDOT Mix W/Straw SY 625 $4.54 $2,837.50 $5.65 $3,531.25 $1.70 $1,062.50
54 Wood Mulch Bed Restoration SY 130 $39.92 $5,189.60 $14.80 $1,924.00 $11.50 $1,495.00
55 Surface Asphaltic Concrete Pavement (1.75-IN) T 500 $70.00 $35,000.00 $70.00 $35,000.00 $70.00 $35,000.00
56 Binder Asphaltic Concrete Pavement (3.25-IN) T 90 $74.75 $6,727.50 $74.75 $6,727.50 $74.75 $6,727.50
57 30-IN Type A Concrete Curb and Gutter LF 260 $33.25 $8,645.00 $26.00 $6,760.00 $32.32 $8,403.20
58 EBS CY 60 $27.50 $1,650.00 $19.00 $1,140.00 $37.00 $2,220.00
59 EBS Breaker Run T 120 $12.80 $1,536.00 $21.00 $2,520.00 $20.00 $2,400.00
60 Geotextile Fabric SY 175 $2.80 $490.00 $3.00 $525.00 $2.70 $472.50
61 Crushed Aggregate Base Course T 385 $14.90 $5,736.50 $22.00 $8,470.00 $18.00 $6,930.00
62 Milling Around Castings and Driveways LS 1 $3,000.00 $3,000.00 $3,000.00 $3,000.00 $3,000.00 $3,000.00
63 Manhole Castings and Valve Box Adjustments LS 1 $4,360.00 $4,360.00 $23,425.00 $23,425.00 $11,300.00 $11,300.00
64 Type 3 Barricades LS 1 $460.00 $460.00 $500.00 $500.00 $1,375.00 $1,375.00
$722,503.55 $794,515.91 $808,214.62Base Bid Total:
JPS:nb2\R:\MAD\Documents\Specifications\Archive\2025\Brooklyn, Village of (WI)\1605.048.1-2024.JPS\(14) Bid Tabs\Brooklyn.1-2024.Bid
R:\MAD\Documents\Specifications\Active\Brooklyn, Village of (WI)\1605.048.1-2024.JPS\Specifications\!Mosaic
Cover (Green=Municipal).docx
Hotel Street
Reconstruction
Contract 1-2024
INTERNAL USE ONLY
INTERNAL USE ONLY
Section 00 01 10-1
1605.048/1-2024
SECTION 00 01 10
TABLE OF CONTENTS
VILLAGE OF BROOKLYN
BROOKLYN, WISCONSIN
HOTEL STREET RECONSTRUCTION
CONTRACT 1-2024
Pages
Through
DIVISION 00–BIDDING AND CONTRACTING REQUIREMENTS
ADVERTISEMENT TO BID ................................ ................................ ............................ 01 11 13- 2
INSTRUCTIONS TO BIDDERS ................................ ................................ ...................... 00 21 13-10
BID ................................ ................................ ................................ ................................ . 00 41 00-11
BID BOND ................................ ................................ ................................ ...................... 00 43 13- 2
QUALIFICATIONS STATEMENT ................................ ................................ ................... 00 49 90-12
AGREEMENT................................ ................................ ................................ ................. 00 52 00-11
NOTICE TO PROCEED................................ ................................ ................................ .. 00 55 00- 1
EROSION CONTROL CERTIFICATION................................ ................................ ......... 00 55 10- 1
PERFORMANCE BOND................................ ................................ ................................ . 00 61 13.13- 4
PAYMENT BOND................................ ................................ ................................ ........... 00 61 13.16- 4
GENERAL CONDITIONS ................................ ................................ ............................... 00 72 00-70
SUPPLEMENTARY CONDITIONS................................ ................................ ................. 00 73 00-19
CERTIFICATE OF LIABILITY INSURANCE ................................ ................................ ... 1
SPECIFICATIONS
DIVISION 01–GENERAL REQUIREMENTS
SUMMARY OF WORK ................................ ................................ ................................ ... 01 11 00- 4
CONTRACT CONSIDERATIONS................................ ................................ ................... 01 29 00- 1
COORDINATION, FIELD ENGINEERING, AND MEETINGS ................................ ......... 01 31 00- 3
SUBMITTALS................................ ................................ ................................ ................. 01 33 00- 4
REGULATORY REQUIREMENTS................................ ................................ .................. 01 41 00- 2
REFERENCE STANDARDS AND DEFINITIONS................................ ........................... 01 42 00- 6
QUALITY CONTROL................................ ................................ ................................ ...... 01 45 00- 2
TEMPORARY FACILITIES................................ ................................ ............................. 01 50 00- 2
TEMPORARY CONTROLS ................................ ................................ ............................ 01 57 00- 3
MATERIALS AND EQUIPMENT................................ ................................ ..................... 01 60 00- 4
CONTRACT CLOSEOUT ................................ ................................ ............................... 01 77 00- 3
DIVISION 02–EXISTING CONDITIONS
DEMOLITION ................................ ................................ ................................ ................. 02 41 00- 3
DIVISION 31–EARTHWORK
CLEARING AND GRUBBING................................ ................................ ......................... 31 10 00- 2
INTERNAL USE ONLY
TABLE OF CONTENTS Continued
Pages
Through
Section 00 01 10-2
1605.048/1-2024
EXCAVATION, FILL, BACKFILL, AND GRADING................................ .......................... 31 23 00-14
DEWATERING ................................ ................................ ................................ ............... 31 23 19- 3
SLOPE PROTECTION AND EROSION CONTROL ................................ ....................... 31 25 00- 8
GEOTEXTILES................................ ................................ ................................ ............... 31 32 19- 1
DIVISION 32–EXTERIOR IMPROVEMENTS
DENSE-GRADED BASE ................................ ................................ ................................ 32 11 23- 3
HOT MIX ASPHALT PAVING ................................ ................................ ......................... 32 11 26- 4
CONCRETE CURB AND GUTTER, SIDEWALKS,DRIVEWAYS, AND DRIVEWAY APRONS. 32 16 13- 6
PAVEMENT MARKINGS................................ ................................ ................................ 32 17 23.13- 1
CHAIN LINK FENCE ................................ ................................ ................................ ...... 32 31 13- 6
EXTRUDED POLYVINYLCHLORIDE (PVC) FENCING................................ .................. 32 31 23- 2
SEEDING ................................ ................................ ................................ ....................... 32 92 19- 4
DIVISION 33–UTILITIES
BURIED PIPING AND APPURTENANCES................................ ................................ .... 33 00 10-22
BURIED PIPING INSULATION................................ ................................ ....................... 33 07 19- 3
DRAWINGS
STANDARD DETAIL–JOINT TIES FOR CONCRETE PIPE ................................ ........... 01-975- 31A
STANDARD DETAIL–STORM SEWER MANHOLES AND INLETS ............................... 01-975- 41A
STANDARD DETAIL–SANITARY SEWER APPURTENANCES................................ ..... 01-975- 43A
STANDARD DETAIL–STANDARD BURIED GATE VALVE BOX SETTING................... 01-975- 64A
STANDARD DETAIL–HYDRANT INSTALLATION ................................ ......................... 01-975- 65A
STANDARD DETAIL–RESIDENTIAL WATER SERVICE LATERAL............................... 01-975- 66A
STANDARD DETAIL–SANITARY SEWER LATERALS................................ .................. 01-975- 75A
STANDARD DETAIL–TRACER WIRE INSTALLATION FOR
NON-CONDUCTIVE SERVICE LATERALS................................ ............................... 01-975- 76A
STANDARD DETAIL–30-INCH CONCRETE CURB AND GUTTER............................... 01-975- 82A
STANDARD DETAIL–24-INCH CONCRETE CURB AND GUTTER............................... 01-975- 83A
STANDARD DETAIL–18-INCH CONCRETE CURB AND GUTTER............................... 01-975- 84A
APPENDICES (NOT PART OF CONTRACT DOCUMENTS)
GEOTECHNICAL EXPLORATION REPORT................................ ................................ .. 35
SUPPLEMENTAL GEOTECHNICAL EXPLORATION REPORT ................................ .... 38
END OF SECTION
INTERNAL USE ONLY
BIDDING AND CONTRACTING REQUIREMENTS
INTERNAL USE ONLY
Section 00 11 13-1
1605.048/1-2024
SECTION 00 11 13
ADVERTISEMENT TO BID
VILLAGE OF BROOKLYN
BROOKLYN, WISCONSIN
HOTEL STREET RECONSTRUCTION
CONTRACT 1-2024
Village of Brooklyn (OWNER) is requesting Bids for the construction of the following Project:
Hotel Street Reconstruction
Contract 1-2024
Electronic Bids for the construction of the Project will be received by OWNER until Wednesday,
February 19, 2025, at 1:30 P.M., local time. At that time the Bids received will be publicly downloaded
and read aloud via teleconference . The login information for the teleconference is as follows:
(309) 205-3325, Conference ID 953 7855 5848.
The Project includes thereconstruction of Hotel Street from Commercial Street to North Rutland Avenue.
This reconstruction involves approximately 325 linear feet (LF) of complete roadway reconstruction with
new asphaltic pavement, curb and gutter, and concrete sidewalk and terrace . This reconstruction work
will also require installation of approximately 310 LF of water main and 485 LF of sanitary sewer main. A
new Village parking lot will also be constructed and will involve site grading, a stormwater basin, and
approximately 10,000 square feet of new aspaltic pavement . This project also includes a roadway
extension of Prosperity Place approximately 130 LF south of current limits and the adjacent surface
asphaltic paving of a section of Prosperity Place and Heritage Drive, which had a binder layer placed in
2024.
Complete digital Project Bidding Documents are available at www.strand.com or at www.questcdn.com.
Download the digital Bidding Documents for $ 75 by inputting Quest project number 9506987 on the
website’sproject search page. Please contact QuestCDN.com at (952)233-1632 or info@questcdn.com
for assistance with free membership registration, downloading, and working with this digital Project
information.
For this Project, Bids will ONLY be received and accepted via the online electronic Bid service through
QuestCDN.com. To access the electron ic Bid Form, download the Project Documents and click the
Online Bidding button.
The Issuing Office is Strand Associates, Inc.®, 910 West Wingra Drive, Madison, WI 53715.
All Bidders submitting a sealed Bid shall obtain the Bidding Documents from QuestCDN.com.
Bidders who submit a Bid must be a Plan Holder of record at the Issuing Office. Bids from Bidders who
are not on the Plan Holders List may be returned as not being responsive.
The Bid must be accompanied by Bid security made p ayable to OWNER in an amount of 10% of the
Bidder’s maximum Bid price.
INTERNAL USE ONLY
Section 00 11 13-2
1605.048/1-2024
OWNER reserves the right to reject any or all Bids, to waive any technicality, and to accept any Bid which
it deems advantageous. All Bids shall remain subject to acceptance for 85 days after the time set for
receiving Bids.
Contract award shall be made based on the lowest responsive and responsible Bidder.
The Strand Associates, Inc. ® project manager is Jon P. Solan and can be contacted at
Strand Associates, Inc.®, 910 West Wingra Drive, Madison, WI 53715, (608) 251-4843, regarding the
Project.
For further requirements regarding Bid submittal, qualifications, procedures, and Contract Award, refer
to the Instructions to Bidders that are included in the Bidding Documents.
Published by the authority of the Village of Brooklyn, Wisconsin
Linda Kuhlman, Village Clerk/Treasurer
Dated at Village of Brooklyn, Wisconsin
January 30, 2025 and February 6, 2025
END OF SECTION
INTERNAL USE ONLY
Section 00 21 13-1
1605.048/1-2024
SECTION 00 21 13
INSTRUCTIONS TO BIDDERS
A. These Instructions to Bidders establish requirements for Bidding and Award of Contract.
B. These articles are not necessarily numbered consecutively.
C. Table of Contents
ARTICLE 1–DEFINED TERMS................................ ................................ ....................... 1
ARTICLE 2–BIDDING DOCUMENTS................................ ................................ ............. 1
ARTICLE 3–QUALIFICATIONS OF BIDDERS................................ ................................ 2
ARTICLE 4–PRE-BID CONFERENCE ................................ ................................ ........... 3
ARTICLE 5–SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION
OF SITE; OWNER’S SAFETY PROGRAM; OTHER WORK AT THE SITE..................... 3
ARTICLE 6–BIDDER’S REPRESENTATIONS AND CERTIFICATIONS.......................... 5
ARTICLE 7–INTERPRETATIONS AND ADDENDA................................ ......................... 5
ARTICLE 8–BID SECURITY................................ ................................ ........................... 5
ARTICLE 9–CONTRACT TIMES................................ ................................ .................... 6
ARTICLE 10–SUBSTITUTE OR “OR EQUAL” ITEMS................................ .................... 6
ARTICLE 11–SUBCONTRACTORS, SUPPLIERS, AND OTHERS................................ . 6
ARTICLE 12–PREPARATION OF BID................................ ................................ ............ 7
ARTICLE 13–BASIS OF BID ................................ ................................ .......................... 8
ARTICLE 14–SUBMITTAL OF BID................................ ................................ ................. 8
ARTICLE 15–MODIFICATION AND WITHDRAWAL OF BIDS................................ ........ 8
ARTICLE 16–OPENING OF BIDS................................ ................................ .................. 8
ARTICLE 17–BIDS TO REMAIN SUBJECT TO ACCEPTANCE................................ ..... 9
ARTICLE 18–EVALUATION OF BIDS AND AWARD OF CONTRACT............................ 9
ARTICLE 19–BONDS AND INSURANCE................................ ................................ ..... 10
ARTICLE 20–SIGNING OF AGREEMENT................................ ................................ .... 10
ARTICLE 21–RETAINAGE................................ ................................ ........................... 10
ARTICLE 22–WAGE RATE DETERMINATION................................ ............................. 10
ARTICLE 23–INCOME TAX................................ ................................ .......................... 10
ARTICLE 24–OTHER TAXES................................ ................................ ....................... 10
ARTICLE 25–LAWS, ORDINANCES, AND REGULATIONS................................ ......... 10
ARTICLE 1–DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General
Conditions and the Supplementary Conditions. Additional terms used in these Instructions to Bidders
have the meanings indicated below which are applicable to both the singular and plural thereof:
A. Issuing Office–The office from which the Bidding Documents are to be issued and which
registers planholders.
ARTICLE 2–BIDDING DOCUMENTS
2.01 Bidder shall obtain a complete set of Bidding Requirements and proposed Contract Documents
(together, the Bidding Documents). See the Agreement for a list of the Contract Documents. It is Bidder's
INTERNAL USE ONLY
Section 00 21 13-2
1605.048/1-2024
responsibility to determine that it is using a complete set of documents in the preparation of a Bid. Bidder
assumes sole responsibility for errors or misinterpretations resulting from the use of incomplete
documents, by Bidder itself or by its prospective Subcontractors and Suppliers.
2.02 Bidding Documents are made available for the sole purpose of obtaining Bids for completion
of the Project and permission to download or distribution of the Bidding Documents does not confer
a license or grant permission or authorization for any other use. Authorization to download
documents, or other distribution, includes the right for plan holders to print documents solely for
their use, and the use of their prospective Subcontractors and Suppliers, provided the plan holder
pays all costs associated with printing or reproduction. Printed documents may not be re -sold under
any circumstances.
2.03 Electronic Documents
A. When the Bidding Requirements indicate that electronic (digital ) copies of the Bidding
Documents are available, such documents will be made available to the Bidders as Electronic Documents
in the manner specified.
1. Bidding Documents will be provided in Adobe PDF (Portable Document Format)
(.pdf) that is readable by Adobe Acrobat Reader Version6.0 or later. It is the intent of ENGINEER
and OWNER that such Electronic Documents are to be exactly representative of the paper copies
of the documents. However, because OWNER and ENGINEER cannot totally control the
transmission and receipt of Electronic Do cuments nor CONTRACTOR's means of reproduction
of such documents, OWNER and ENGINEER cannot and do not guarantee that E lectronic
Documents and reproductions prepared from those versions are identical in every manner to the
paper copies.
B. Unless otherwise stated in the Bidding Documents, the Bidder may use and rely upon
complete sets of Electronic Documents of the Bidding Documents, described in Paragraph 2.03.A above.
However, Bidder assumes all risks associated with differences arising from transmission/receipt of
Electronic Documents versions of Bidding Documents and reproductions prepared from those versions
and, further, assumes all risks, costs, and responsibility associated with use of the Electronic Documents
versions to derive information that is not explicitly contained in printed paper versions of the documents,
and for Bidder's reliance upon such derived information.
ARTICLE 3–QUALIFICATIONS OF BIDDERS
3.01 To demonstrate Bidder’s qualifications to perform the Work, Bidder shall submit with its Bid the
Qualifications Statement.
3.02 Bidder must be prepared to submit evidence of Bidder’s qualifications to do business in the state
where the Project is located prior to award of the Contract.
3.03 A Bidder’s failure to submit required qualification information within the times indicated may
disqualify Bidder from receiving an award of the Contract.
3.04 Bidders shall submit the documentation listed in Paragraph 7.01 of the Bid Form
(Section 00 41 00).
3.05 No requirement in this Article 3 to submit information will prejudice the right of OWNER to seek
additional pertinent information regarding Bidder’s qualifications.
INTERNAL USE ONLY
Section 00 21 13-3
1605.048/1-2024
3.06 Bidder is advised to carefully review those portions of the Bidding Documents requiring Bidder’s
representations and certifications.
ARTICLE 4–PRE-BID CONFERENCE
4.01 A pre-bid conference will not be held for this Project.
ARTICLE 5–SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE;
OWNER’SSAFETY PROGRAM; OTHER WORK AT THE SITE
5.01 Site and Other Areas
A. The Site is identified in the Bidding Documents. By definition, the Site includes
rights-of-way, easements, and other lands furnished by OWNER for the use of CONTRACTOR. Any
additional lands required for temporary construction facilities, construction equipment, or storage of
materials and equipment, and any access needed for such additional lands, are to be obtained and paid
for by CONTRACTOR.
5.02 Existing Site Conditions
A. Subsurface and Physical Conditions; Hazardous Environmental Conditions
1. The Supplementary Conditions identify the following regarding existing conditions
at or adjacent to the Site:
a. Those reports of explorations and tests of subsurface conditions at or
adjacent to the Site that contain Technical Data.
b. Those drawings known to OWNER of existing physical conditions at or
adjacent to the Site, including those drawings depicting existing surface or subsurface
structures at or adjacent to the Site (except Underground Facilities), that contain Technical
Data.
c. Reports and drawings known to OWNER relating to Hazardous
Environmental Conditions that have been identified at or adjacent to the Site.
d. Technical Data contained in such reports and drawings.
2. OWNER will make copies of reports and drawings referenced above available to
any Bidder on request. These reports and drawings are not part of the Contract Documents, but
the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided
in the General Conditions, has been identified and established in the Supplementary Conditions.
Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data
or any other data, interpretations, opinions, or information contained in such reports or shown or
indicated in such drawings.
3. If the Supplementary Conditions do not identify Technical Data, the default
definition of Technical Data set forth in Article 1 of the General Conditions will apply.
B. Underground Facilities: Underground Facilities are shown or indicated on the Drawings,
pursuant to Paragraph 5.05 of the General Conditions, and not in the drawings referred to in
Paragraph 5.02.A of these Instructions to Bidders. Information and data regarding the presence or
INTERNAL USE ONLY
Section 00 21 13-4
1605.048/1-2024
location of Underground Facilities are not intended to be categorized, identified, or defined as Technical
Data.
5.03 Other Site-Related Documents
A. No other Site-related documents are available.
5.04 Site Visit and Testing by Bidders
A. Bidder is required to visit the Site and conduct a thorough visual examination of the Site
and adjacent areas. During the visit the Bidder must not disturb any ongoing operations at the Site.
B. Bidders visiting the Site are required to arrange their own transportation to the Site.
C. All access to the Site other than during a regularly scheduled Site visit must be coordinated
through the following OWNER contact for visiting the Site: Linda Kuhlman,
(608) 455-4201. Bidder must conduct the required Site visit during normal working hours.
D. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of
Site conditions.
E. On request, and to the extent OWNER has control over the Site, and schedule permitting,
OWNER will provide Bidder general access to the Site to conduct such additional examinations,
investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting
a successful Bid. OWNER will not have any obligation to grant such access if doing so is not practical
because of existing operations, security or safety concerns, or restraints on OWNER's authority regarding
the Site. Bidder is responsible for establishing access needed to reach specific selected test sites.
F. Bidder must comply with all applicable Laws and Regulations regarding excavation and
location of utilities, obtain all permits, and comply with all terms and conditions established by OWNER
or by property owners or other entities controlling the Site with respect to schedule, access, existing
operations, security, liability insurance, and applicable safety programs.
G. Bidder must fill all holes and clean up and restore the Site to its former condition upon
completion of such explorations, investigations, tests, and studies.
5.05 OWNER’s Safety Program
A. Site visits and work at the Site may be governed by an OWNER safety program. If an
OWNER safety program exists, it will be noted in the Supplementary Conditions.
5.06 Other Work at the Site
A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the
general nature of other work of which OWNER is aware (if any) that is to be performed at the Site by
OWNER or others (such as utilities and other prime contractors ) and relates to the Work contemplated
by these Bidding Documents. If OWNER is party to a written contract for such other work, then on request,
OWNER will provide to each Bidder access to examine such contracts (other than portions thereof related
to price and other confidential matters), if any.
INTERNAL USE ONLY
Section 00 21 13-5
1605.048/1-2024
ARTICLE 6–BIDDER’S REPRESENTATIONSAND CERTIFICATIONS
6.01 Express Representations and Certifications in Bid Form, Agreement
A. The Bid Form that each Bidder will submit contains express representations regarding the
Bidder's examination of Project documentation, Site visit, and preparation of the Bid, and certifications
regarding lack of collusion or fraud in connection with the Bid. Bidder should review these representations
and certifications, and assure that Bidder can make the representations and certifications in good faith,
before executing and submitting its Bid.
B. If Bidder is awarded the Contract, Bidder (as CONTRACTOR) will make similar express
representations and certifications when it executes the Agreement.
ARTICLE 7–INTERPRETATIONS AND ADDENDA
7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to
ENGINEER in writing. Interpretations or clarifications considered necessary by ENGINEER in response
to such questions will be issued by Addenda mailed or delivered toall parties recorded by Issuing Office
as having received the Bidding Documents.
7.02 All requests for interpretation must be received at least five days prior to the day set for receiving
Bids. Addenda will be issued not later than three days prior to the day set for receiving Bids. Failure of
any Bidder to receive any such Addendum or interpretation shall not relieve such Bidder from any
obligations under the Bid as submitted. All Addenda so issued shall become part of the Contract
Documents.
7.03 Only responses set forth in an Addendum will be binding. Oral and other interpretations or
clarifications will be without legal effect. Responses to questions are not part of the ContractDocuments
unless set forth in an Addendum that expressly modifies or supplements the Contract Documents.
ARTICLE 8–BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to OWNER in an amount of 10% of
the Bidder’s maximum Bid price and in the form of Surety2000, a certified check, bank money order,
or a Bid Bond (on form attached) issued by a surety meeting the requirements of Paragraph 6.01 of
the General Conditions. A PDF copy of the Bid Bond can be attached to electronically submitted
Bids.
8.02 The Bid security of the apparent Successful Bidder will be retained until OWNER awards the
contract to such Bidder, and such Bidder has executed the Contract, furnished the required Contract
security, and met the other conditions of the Notice of Award, whereupon the Bid security will be
released. If the Successful Bidder fails to ex ecute and deliver the Contract and furnish the required
Contract security within 15 days after the Notice of Award, OWNER may consider Bidder to be in
default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited, in whole in
the case of a Penal Sum Bid Bond , and to the extent of OWNER's damages in the case of a
damages -form bond. Such forfeiture will be OWNER's exclusive remedy if Bidder defaults.
8.03 The Bid security of other Bidders that OWNER believes to have a reasonable chance of
receiving the award may be retained by OWNER until the earlier of 7 days after the Effective Date
of the Contract or 86 days after the Bid opening, whereupon Bid security furnished by such Bidders
will be released.
INTERNAL USE ONLY
Section 00 21 13-6
1605.048/1-2024
8.04 Bid security of other Bidders that OWNER believes do not have a reasonable chance of
receiving the award will be released within 7 days after the Bid opening.
ARTICLE 9–CONTRACT TIMES
9.01 The number of days within which, or the dates by which, the Work is to be (a) substantially
completed and (b) ready for final payment, and (c) Milestones (if any) are to be achieved, are set forth in
the Agreement.
9.02 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial
Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.
ARTICLE 10–SUBSTITUTE OR “OR EQUAL”ITEMS
10.01 The Contract, if awarded, will be on the basis of materials and equipment specified or
described in the Bidding Documents without evaluation of Alternative Equipment Manufacturers
listed in the Lump Sum Base Bid, if any, and without evaluation of possible substitute or “or equal”
items. Whenever it is specified or described in the Bidding Documents that an Alternative Equipment
Manufacturers listed in the Lump Sum Base Bid or that a substitute or “or equal” item of material or
equipment may be furnish ed or used by CONTRACTOR if acceptable to ENGINEER, application for
such acceptance will not be evaluated by ENGINEER until after the Effective Date of the Contract .
10.02 All prices that Bidder sets forth in its Bid shall be based on the presumption that
CONTRACTOR will furnish the materials and equipment specified or described in the Bidding
Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post -Bid
approval s of “or-equal” or substitution requests are made at Bidder’s sole risk.
ARTICLE 11–SUBCONTRACTORS, SUPPLIERS, AND OTHERS
11.01 A Bidder must be prepared to retain specific Subcontractors and Suppliers for the performance
of the Work if required to do so by the Bidding Documents or in the Specifications. If a prospective Bidder
objects to retaining any such Subcontractor or Supplier and the concern is not relieved by an Addendum,
then the prospective Bidder should refrain from submitting a Bid.
11.02 Subsequent to the submittal of the Bid, OWNER may not require the Successful Bidder or
CONTRACTOR to retain any Subcontractor, Supplier, or other individual or entity against which
CONTRACTOR has reasonable objection.
11.03 The apparent Successful Bidder, and any other Bidder so requested, shall within five days after
Bid opening, submit to OWNER a list of the Subcontractors or Suppliers proposed for the Work. If
requested by OWNER, such list shall be accompanied by an experi ence statement with pertinent
information regarding similar projects and other evidence of qualification for each such Subcontractor,
Supplier, or other individual or entity. If OWNER or ENGINEER, after due investigation, has reasonable
objection to any proposed Subcontractor, Supplier, individual, or entity, OWNER may, before the Notice
of Award is given, request apparent Successful Bidder to submit an acceptable substitute, in which case
apparent Successful Bidder shall submit a substitute, Bidder’sBid price will be increased (or decreased)
by the difference in cost occasioned by such substitution, and OWNER may consider such price
adjustment in evaluating Bids and making the Contract award.
11.04 If apparent Successful Bidder declines to make any such substitution, OWNER may award the
Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, or other
individuals or entities. Declining to make requested substi tutions will constitute grounds for forfeiture of
the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against
INTERNAL USE ONLY
Section 00 21 13-7
1605.048/1-2024
which OWNER or ENGINEER makes no written objection prior to the giving of the Notice of Award will
be deemed acceptable toOWNER and ENGINEER subject to subsequent revocation of such acceptance
as provided in Paragraph 7.07 of the General Conditions.
ARTICLE 12–PREPARATION OFBID
12.01 The Bid Form is included with the Bidding Documents.
A. All blanks on the Bid Form shall be completed and the Bid Forms shall be signed. A Bid
price shall be indicated for each section, Bid item, alternate, adjustment unit price item, and unit price
item listed therein.
B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is
optional, and Bidder elects to not furnish pricing for such optional alternate item, then Bidder may enter
the words “No Bid” or “Not Applicable.”
C. All blanks on the Bid Form must be filled and all required documents uploaded before
QuestCDN.com will accept the Bid. The Bid shall be signed electronically where required and in
accordance with the instructions included in this Article.
12.02 A Bid by a corporation shall be executed in the corporate name by a corporate officer (whose
title must appear under the signature), accompanied by evidence of authority to sign. The corporate
address and state of incorporation shall be shown.
12.03 A Bid by a partnership shall be executed in the partnership name and signed by a partner
(whose title must appear under the signature), accompanied by evidence of authority to sign. The
official address and state of incorporation shall be shown .
12.04 A Bid by a limited liability comp any shall be executed in the name of the firm by a member , if
the LLC is member-managed, or by a manager, if manager-managed, and accompanied by evidence
of authority to sign. The state of formation of the firm and the official address of the firm shall be
shown.
12.05 A Bid by an individual shall show the Bidder’s name and official address.
12.06 A Bid by a joint venture must be executed by an authorized representative of each joint
venturer in the manner indicated on the Bid Form. The joint venture must have been formally
established prior to submittal of a Bid, and the official address of the joi nt venture must be shown.
12.07 All names shall be printed below the signatures.
12.08 Postal and e -mail addresses and telephone number for communications regarding the Bid
shall be shown.
12.09 The Bid must contain evidence of Bidder's authority to do business in the state where the
Project is located, or Bidder must certify in writing that it will obtain such authority within the time for
acceptance of Bids and attach such certification to the Bid.
12.10 If Bidder is required to be licensed to submit a Bid or perform the Work in the state where the
Project is located, the Bid must contain evidence of Bidder's licensure, or Bidder must certify in writing
that it will obtain such licensure within the time for acceptance of Bids and attach such certification to the
Bid. Bidder's state contractor license number, if any, must also be shown on the Bid Form.
INTERNAL USE ONLY
Section 00 21 13-8
1605.048/1-2024
12.11 All Bids shall be signed in the presence of and be notarized by a Notary Public or other
Officer authorized to administer oaths.
ARTICLE 13–BASIS OF BID
13.01 Unit Price
A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the unit
price section of the Bid Form.
B. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item
will be the product of the “Estimated Quantity” (which OWNER or its representative has asset forth in the
Bid Form) for the item and the corresponding “Bid Unit Price” offered by the Bidder. The total of all unit
price Bid items will be the sum of these “Bid Prices;” suchtotal will be used by OWNER forBid comparison
purposes. The final quantities and Contract Price will be determined in accordance with Paragraph13.03
of the General Conditions.
13.02 Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor
of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum
thereof will be resolved in favor of the corr ect sum. For Bids submitted on a Lump Sum basis,
discrepancies between words and figures will be resolved in favor of the words.
ARTICLE 14–SUBMITTALOF BID
14.01 Bids will be received for all divisions of the Specifications and all other provisions of the
Bidding Documents.
14.02 A Bid shall be submitted no later than the date and time prescribed and at the place indicated
in the Advertisement or Invitation to Bid .
14.03 Bids received after the date and time prescribed for the opening of Bids, or not submitted at
the correct location or in the designated manner, will not be accepted and will be returned to the
Bidder unopened.
ARTICLE 15–MODIFICATION AND WITHDRAWAL OF BIDS
15.01 A Bid may be modified or withdrawn by an appropriate document duly executed in the manner
that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the
date and time set for receiving Bids.
15.02 If within 24 hours after Bids are opened any Bidder files a duly signed written notice withOWNER
and promptly thereafter demonstrates to the reasonable satisfaction ofOWNER that there was amaterial
and substantial mistake in the preparation of its Bid, the Bidder may withdraw its Bid, and the Bid security
will be returned. Thereafter, if the Work is rebid, the Bidder will be disqualified from furtherBidding on the
Work.
ARTICLE 16–OPENING OF BIDS
16.01 Bids will be downloaded at the time and place indicated in the Advertisement or Invitation to
Bid and, unless obviously nonresponsive, read aloud publicly. An abstract of the amounts of the
Base Bid s and major alternatives and components, if any, will be made available to Bidders after
the opening of Bids.
INTERNAL USE ONLY
Section 00 21 13-9
1605.048/1-2024
ARTICLE 17–BIDS TO REMAIN SUBJECT TO ACCEPTANCE
17.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but
OWNER may, in its sole discretion, release any Bid and return the Bid security prior to the end of
this period.
ARTICLE 18–EVALUATION OF BIDS ANDAWARD OF CONTRACT
18.01 OWNER reserves the right to reject any or all Bids, including without limitation,
nonconforming, nonresponsive, unbalanced, or conditional Bids. OWNER also reserves the right to
waive all minor Bid informalities not involving price, time, or changes in the Work.
18.02 OWNER will reject the Bid of any Bidder that OWNER finds, after reasonable inquiry and
evaluation, to not be responsible.
18.03 If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the
Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid,
whether in the Bid itself or in a separate communication to OWNER or ENGINEER, then OWNER will
reject the Bid as nonresponsive.
18.04 In evaluating Bids, OWNER will consi der whether or not the Bids comply with the prescribed
requirements, and such alternatives, unit prices, and other data as may be requested in the Bid Form or
prior to the Notice of Award.
18.05 In evaluating Bids, OWNER will consider the qualifications of Bidders and may consider the
qualifications and experience of Subcontractors, Suppliers, and other individuals or entities
proposed for those portions of the Work for which the identity of Subcontractors, Suppliers, and
other individuals or entities must be submitted as provided in the Supplementary Conditions.
OWNER also may consider the operating costs, maintenance require ments, performance data, and
guarantee s of major items of materials and equipment proposed for incorporation in the work when
such data is require d to be submitted prior to the Notice of Award.
18.06.1 OWNER may conduct such investigations as OWNER deems necessary to assist in the
evaluation of any Bid and to establish the responsibility, qualifications, and financial ability of
Bidders, proposed Subcontractors, Suppliers, individuals or entities to perform the Work in
accordance with the Contract Documents to OWNER’s satisfaction within the prescribed time.
Bidder shall furnish to OWNER all such information and data for this purpose as OWNER may
request. OWNER reserves the right to reject any Bid if the evidence submitted by, or investigation
of, such Bidder fails to satisfy OWNER that such Bidder is properly qualified to carry out the
obligations of the Contract Documents and to complete the work contemplated therein.
18.06.2 OWNER shall be satisfied that Bidder involved (1) maintains a permanent place of business,
(2) has adequate plant and equipment to do the work properly and expeditiously, (3) has a suitable
financial status to meet obligations incident to the work, (4) has appropriate technical experience,
and (5) can submit a satisfactory performance record.
18.07 If a Contract is to be awarded, it will be awarded to the responsible Bidder with the lowest
responsive Bid whose evaluation by OWNER indicates to OWNER that the award will be in the best
interests of the Project.
INTERNAL USE ONLY
Section 00 21 13-10
1605.048/1-2024
18.08 If a Contract is to be awarded, OWNER will give the successful Bidder a Notice of Award
within 60 days after the time set for opening Bids.
ARTICLE 19–BONDS AND INSURANCE
19.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions,
sets forth OWNER's requirements as to performance and payment bonds, other required bonds (if
any), and insurance. When the Successful Bidder delivers the executed Agreement to OWNER, it
must be accompanied by required bonds and insurance documentation.
19.02 Article 8, Bid Security, of these Instructions, addresses any requirements for providingBid Bonds
as part of the Bidding process.
ARTICLE 20–SIGNING OF AGREEMENT
20.01 When OWNER gives a Notice of Award to the Successful Bidder, it shall be accompanied by
the required number of unexecuted counterparts of the Agreement along with all other Contract
Documents which are identified in the Agreement as attached thereto. Withi n 15 days thereafter,
Successful Bidder shall execute and deliver the required number of counterparts of the Agreement
and attached documents to ENGINEER with the required Bonds and insurances. Within 10 days
after receipt of properly executed documents an d Bonds and insurances which meet all
requirements of the Contract Documents, ENGINEER will deliver one fully signed counterpart to
Successful Bidder.
ARTICLE 21–RETAINAGE
21.01 Provisions concerning retainage are set forth in the Agreement.
ARTICLE 22–WAGE RATE DETERMINATION
22.01 A wage rate determination is not a requirement of this Project.
ARTICLE 23–INCOME TAX
23.01 Bidders, whether a corporation, partnership, or individual, who are nonresidents of the state
of Wisconsin, shall comply with Section 71.80 (16) of the Wisconsin Statutes.
ARTICLE 24–OTHER TAXES
24.01 The Bid shall includeall taxes in effect at the time the Bid is submitted. Bidders who are uncertain
as to what items are subject to tax, or who require further explanation or clarification, are requested to
contact the State ofWisconsin Department of Revenue. Refer to the Supplementary Conditions SC-7.10
for additional information on taxes including exemptions for sales and use taxes.
ARTICLE 25–LAWS, ORDINANCES, AND REGULATIONS
25.01 Bidder must familiarize itself with all laws, ordinances, and regulations by federal, state, city,
or other governmental agency, which by reason of being neglected or violated may affect the Work
contemplated and must secure and pay the fee require d for any permits which may be necessary
unless such fees are otherwise indicated to be paid in the Bidding Documents.
END OF SECTION
INTERNAL USE ONLY
Section 00 41 00-1
1605.048/1-2024
SECTION 00 41 00
BID
VILLAGE OF BROOKLYN
BROOKLYN, WISCONSIN
HOTEL STREET RECONSTRUCTION
CONTRACT 1-2024
A. Table of Contents
ARTICLE 1. BID RECIPIENT
ARTICLE 2. BIDDER’S ACKNOWLEDGEMENTS : ACCEPTANCE PERIOD,
INSTRUCTIONS, AND RECEIPT OF ADDENDA
ARTICLE 3. BIDDER’S REPRESENTATIONS
ARTICLE 4. BIDDER’SCERTIFICATIONS
ARTICLE 5. BASIS OF BID
ARTICLE 6. TIME OF COMPLETION
ARTICLE 7. ATTACHMENTS TO THIS BID
ARTICLE 8. DEFINED TERMS
ARTICLE 9. COMMUNICATIONS
ARTICLE 10. BID SUBMITTAL
ARTICLE 1 –BID RECIPIENT
1.01 Bids to be received until 1:30 P.M., local time , February 19, 2025.
1.02 Online electronic Bidding through QuestCDN.com is the only way the Bid will be accepted.
To access the electronic Bid Form , download the Project Documents and click the Online Bidding
button.
1.03 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an
Agreement with OWNER in the form included in the Bidding Documents to perform all Work as
specified or indicated in the Bidding Documents for the prices and within the times indicated in this
Bid and in accordance with the other terms and con ditions of the Bidding Documents.
ARTICLE 2 –BIDDER’S ACKNOWLEDGEMENTS: ACCEPTANCE PERIOD, INSTRUCTIONS, AND
RECEIPT OF ADDENDA
2.01 Bid Acceptance Period
A. This Bid will remain subject to acceptance for 85 days after the Bid opening, or for
such longer period of time that Bidder may agree to in writing upon request of OWNER.
2.02 Instructions to Bidders
A. Bidder accepts all of the terms and conditions of the Instructions to Bidders, including
without limitation those dealing with the disposition of Bid security.
INTERNAL USE ONLY
Section 00 41 00-2
1605.048/1-2024
2.03 In submitting this Bid, Bidder represents the following:
A. Bidder has examined and carefully studied the Bidding Documents, and any data and
reference items identified in the Bidding Documents, and hereby acknowledges receipt of the
addenda .
2.04 Bidder will sign and deliver the required number of counterparts of the Agreement with the
bonds, insurance certificates, and other documents required by the Bidding Requirements within
15 days after the date of OWNER’s Notice of Award.
ARTICLE 3 –BIDDER’S REPRESENTATIONS
3.01 Bidder’s Representations
A. In submitting this Bid, Bidder represents the following:
1. Bidder has examined and carefully studied the Bidding Documents, including
Addenda.
2. Bidder has visited the Site, conducted a thorough visual examination of the
Site and adjacent areas, and become familiar with the general, local, and Site conditions that
may affect cost, progress, and performance of the Work.
3. Bidder is familiar with all Laws and Regulations that may affect cost, progress,
and performance of the Work.
4. Bidder has carefully studied the reports of explorations and tests of subsurface
conditions at or adjacent to the Site and the drawings of physical conditions relating to
existing surface or subsurface structures at the Site that have been identified in the
Supplementary Conditions, with respect to the Technical Data in such reports and drawings.
5. Bidder has carefully studied the reports and drawings relating to Hazardous
Environmental Conditions, if any, at or adjacent to the Site that have been identified in the
Supplementary Conditions, with respect to Technical Data in such reports and drawin gs.
6. Bidder has considered the information known to Bidder itself; information
commonly known to contractors doing business in the locality of the Site; information and
observations obtained from visits to the Site; the Bidding Documents; and the Technical D ata
identified in the Supplementary Conditions or by definition, with respect to the effect of such
information, observations, and Technical Data on (a) the cost, progress, and performance of
the Work; (b) the means, methods, techniques, sequences, and pro cedures of construction
to be employed by Bidder, if selected as CONTRACTOR ; and (c) Bidder's ( CONTRACTOR 's)
safety precautions and programs.
7. Based on the information and observations referred to in the preceding
paragraph, Bidder agrees that no further examinations, investigations, explorations, tests,
studies, or data are necessary for the performance of the Work at the Contract Price, with in
the Contract Times, and in accordance with the other terms and conditions of the Contract.
8. Bidder is aware of the general nature of work to be performed by O WNER and
others at the Site that relates to the Work as indicated in the Bidding Documents.
9. Bidder has given ENGINEER written notice of all conflicts, errors, ambiguities,
or discrepancies that Bidder has discovered in the Bidding Documents, and of discrepancies
between Site conditions and the Contract Documents, and the written resolution thereof by
ENGINEER is acceptable to CONTRACTOR.
INTERNAL USE ONLY
Section 00 41 00-3
1605.048/1-2024
10. The Bidding Documents are generally sufficient to indicate and convey
understanding of all terms and conditions for performance and furnishing of the Work.
11. The submission of this Bid constitutes an incontrovertible representation by
Bidder that without exception the Bid and all prices in the Bid are premised upon performing
and furnishing the Work required by the Bidding Documents.
ARTICLE 4 –BIDDER’S CERTIFICATIONS
4.01 Bidder certifies the following:
A. This Bid is genuine and not made in the interest of or on behalf of any undisclosed
individual or entity and is not submitted in conformity with any collusive agreement or rules of any
group, association, organization, or corporation.
B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a
false or sham Bid.
C. Bidder has not solicited or induced any individual or entity to refrain from Bidding.
D. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in
competing for the Contract. For the purposes of this Paragraph 4.01.D:
1. Corrupt practice means the offering, giving, receiving, or soliciting of anything
of value likely to influence the action of a public official in the Bidding process.
2. Fraudulent practice means an intentional misrepresentation of facts made
(a) to influence the Bidding process to the detriment of OWNER, (b) to establish Bid prices
at artificial non -competitive levels, or (c) to deprive OWNER of the benefits of free and open
competition.
3. Collusive practice means a scheme or arrangement between two or more
Bidders, with or without the knowledge of OWNER, a purpose of which is to establish Bid
prices at artificial, non -competitive levels.
4. Coercive practice means harming or threatening to harm, directly or indirectly,
persons or their property to influence their participation in the Bidding process or affect the
execution of the Contract.
INTERNAL USE ONLY
Section 00 41 00-4
1605.048/1-2024
ARTICLE 5 –BASIS OF BID
5.01 Bidder will complete the Work in accordance with the Contract Documents for the following
price(s):
The following abbreviations may be used in this Bid:
CIP - Complete in Place LF - Linear Foot
CY - Cubic Yard LS - Lump Sum
DI - Ductile Iron LT - Left
DIA - Diameter MBF - Thousand Board Feet
EA - Each MFOB - Thousand Freight -On-Board
EBS - Excavation Below Subgrade MH - Manhole
EST - Estimate(d) RCP - Reinforced Concrete Pipe
EXCL - Excluding RT - Right
FT - Feet SF - Square Foot
GAL - Gallon STA - Station
HERCP - Horizontal Elliptical RCP SY - Square Yard
HRS - Hours T - Ton
IN - Inch VLF - Vertical Linear Foot
INCL - Including W/ - With
LBS - Pounds W/O - Without
BIDDERS SHOULD NOT ADD ANY CONDITIONS OR QUALIFYING STATEMENTS TO THIS BID
OR THE BID MAY BE DECLARED IRREGULAR AS NOT BEING RESPONSIVE TO THE
INSTRUCTIONS TO BIDDERS.
INTERNAL USE ONLY
Section 00 41 00-5
1605.048/1-2024
BID
VILLAGE OF BROOKLYN
BROOKLYN, WISCONSIN
HOTEL STREET RECONSTRUCTION
CONTRACT 1-2024
The following prices per item shall be for furnishing and installing the various items of material and
work as specified and shown on the Drawings. Bidder agrees to perform the Work as shown on the
Drawings and described in the Specifications for the follo wing listed pr ices. Bidder acknowledges
that unit prices have been computed in accordance with Paragraph 13.03 of the General Conditions.
Bidder acknowledges that estimated quantities are not guaranteed, and are solely for the purpose
of comparison of Bids , and final payment for all Unit Price Bid items will be based on actual
quantities, determined as provided in the Contract Documents.
NOTE: A price must be bid for each item in the Bid, even though the estimated quantity is zero.
Unbalanced or unreasonable unit prices may cause rejection of the Bid.
Item No. Description Estimated
Quantity Unit Bid Unit Price Bid Price
Sanitary Sewer
1. 8-IN Sanitary Sewer 330 LF $ $
2. 4-IN Sanitary Sewer Lateral 80 LF $ $
3. 4-FT-DIA Sanitary Sewer MH
W/ Casting
3 EA $ $
4. Connect to Existing Sanitary MH 1 EA $ $
5. Abandon Existing Sanitary Sewer 1 LS $ $
6. Existing Sewer Lateral ULO 5 EA $ $
7. Sanitary Sewer Granular Trench
Backfill
330 LF $ $
Water Main
8. 8-IN-DIA Water Main 345 LF $ $
9. 8-IN Valve and Road Box 2 EA $ $
10. 6-IN Valve and Road Box 1 EA $ $
11. 1-IN Corporation Stop 2 EA $ $
12. 1-IN Curb Stop and Box 4 EA $ $
13. 1-IN Copper Water Service Laterals 330 LF $ $
14. Abandon Existing Water Main 1 LS $ $
15. Salvage and Reinstall Existing Aux.
Valve and Hydrant
1 LS $ $
16. Connect to Existing Water Main 3 EA $ $
INTERNAL USE ONLY
Section 00 41 00-6
1605.048/1-2024
Item No. Description Estimated
Quantity Unit Bid Unit Price Bid Price
17. Water Main Granular Trench Backfill 345 LF $ $
Storm Sewer
18. 12-IN RCP Storm Sewer 220 LF $ $
19. Pond Overflow Structure 1 EA $ $
20. 2-FT by 3-FT Precast Inlet W/ Casting 1 EA $ $
21. Connect to Existing Inlet 1 EA $ $
22. Detention Basin Common Excavation
and Site Grading (EXCL Storm Sewer)
1 LS $ $
23. Storm Sewer Granular Trench Backfill 220 LF $ $
Street Construction and Restoration
24. Clearing and Grubbing 1 LS $ $
25. Site Grading/Common Excavation 1 LS $ $
26. EBS 690 CY $ $
27. EBS Breaker Run 1,380 T $ $
28. Geotextile Fabric 825 SY $ $
29. Crushed Aggregate Base Course 2,000 T $ $
30. 30-IN Type A Concrete Curb and Gutter 1,020 LF $ $
31. 5-IN Concrete Sidewalk 4,825 SF $ $
32. 5-IN Concrete Terrace 1,000 SF $ $
33. 7-IN Concrete Sidewalk 400 SF $ $
34. 7-IN Concrete Driveway and Apron 290 SF $ $
35. 9-IN Concrete Valley Gutter 45 LF $ $
36. 8-IN Concrete Dumpster Pad 1 EA $ $
37. Concrete Stairs and Railing
Replacement
1 LS $ $
38. Detectable Warning Field 20 SF $ $
39. Asphaltic Concrete Pavement 600 T $ $
40. Asphalt Driveway 60 SF $ $
41. Pavement Markings 1 LS $ $
42. Site Signage 1 LS $ $
INTERNAL USE ONLY
Section 00 41 00-7
1605.048/1-2024
Item No. Description Estimated
Quantity Unit Bid Unit Price Bid Price
43. Downspout Trench Drains W/ Curb
Head Insert
3 EA $ $
44. Fence Chain Link, Zinc Coated
W/ Privacy Slats, 6-FT Height
46 LF $ $
45. Fence Chain Link, Zinc Coated
W/ Privacy Slats, 6-FT Height,
10-FT-Wide Access Gate
1 LS $ $
46. Vinyl Privacy Fence, 8-FT Height 160 LF $ $
47. Silt Fence 910 LF $ $
48. Traffic Control 1 LS $ $
49. Dewatering 1 LS $ $
50. Tracking Pads 2 EA $ $
51. Inlet Protection 7 EA $ $
52. Furnish and Install #40 WisDOT Mix
W/ Mat
325 SY $ $
53. Furnish and Install #40 WisDOT Mix
W/ Straw
625 SY $ $
54. Wood Mulch Bed Restoration 130 SY $ $
Prosperity Place Area Work
55. Surface Asphaltic Concrete Pavement
(1.75-IN)
500 T $ $
56. Binder Asphaltic Concrete Pavement
(3.25-IN)
90 T $ $
57. 30-IN Type A Concrete Curb and Gutter 260 LF $ $
58. EBS 60 CY $ $
59. EBS Breaker Run 120 T $ $
60. Geotextile Fabric 175 SY $ $
61. Crushed Aggregate Base Course 385 T $ $
62. Milling Around Castings and Driveways 1 LS $ $
63. Manhole Castings and Valve Box
Adjustments
1 LS $ $
64. Type 3 Barricades 1 LS $ $
COMPUTED TOTAL BID CONTRACT 1-2024 (ITEMS 1 THROUGH 64)
Dollars $
(Words) (Numbers)
INTERNAL USE ONLY
Section 00 41 00-8
1605.048/1-2024
ARTICLE 6–TIME OF COMPLETION
6.01 Bidder agrees that the Work will be substantially complete on or before June 2 7, 2025, and
will be completed and ready for final payment in accordance with Paragraph 15.06 of the General
Conditions on or before July 11, 2025.
6.02 Bidder accepts the provisions of the Agreement as to liquidated damages in the event of
failure to complete the Work within the Contract Times.
ARTICLE 7 –ATTACHMENTS TO THIS BID
7.01 The following documents are attached to and made a condition of this Bid:
A. Required Bid security in the form of
(Surety2000, Certified Check, Bank Money Order, or Bond)
B. Evidence of authority to do business in the state of the Project; or a written covenant
to obtain such license, if applicable, within the time for acceptance of Bids.
C. Where applicable, Bidder shall provide CONTRACTOR’s License Number for the state
of the Project, where noted at end of Bid or Bidder shall provide evidence of Bidder’s ability to obtain
a State Contractor’s License and a covenant by Bidder to obtain said license within the time for
acceptance of Bids.
D. Required Bidder’s Qualifications Statement with supporting data.
ARTICLE 8 –DEFINED TERMS
8.01 The terms used in this Bid with initial or all capital letters have the meanings stated in the
Instructions to Bidders, the General Conditions, and the Supplementary Conditions.
ARTICLE 9 –COMMUNICATIONS
9.01 Communications concerning this Bid shall be addressed to the address of Bidder indicated
below:
Name:
Street:
City, State, Zip Code:
Phone No.: Fax No.:
E-mail address :
ARTICLE 10 –BID SUBMITTAL
Submitted on
State Contractor License Number _________ (if applicable).
INTERNAL USE ONLY
Section 00 41 00-9
1605.048/1-2024
If Bidder is:
An Individual
By:
(Individual’s signature)
Name (typed or printed):
Doing business as:
Business address:
Phone No.: Fax No.:
E-mail address :
A Partnership
Partnership Name:
By:
(Signature of general partner -- attach evidence of authority to sign)
Name (typed or printed):
Business address:
Phone No.: Fax No.:
E-mail address :
A Corporation
Corporation Name:
State of Incorporation:
Type (General Business, Professional, Service, Limited Liability):
By:
(Signature -- attach evidence of authority to sign)
Name (typed or printed):
Title:
Attest
(Signature of Corporate Secretary)
Business address:
Phone No.: Fax No.:
E-mail address :
Date of Qualification to do business in (State where the Project is located) is
Sworn and subscribed to before me this Notary Public or Other Officer
day of , Authorized to Administer Oaths.
My Commission expires:
INTERNAL USE ONLY
Section 00 41 00-10
1605.048/1-2024
A Limited Liability Company (Note: If member -managed, an authorized member must sign; if
manager -managed, the authorized manager must sign. Attach evidence of authority to sign on
behalf of LLC).
(Fill in complete name of LLC)
State of Formation:
By:
(Signature)
, [Member] [Manager]
(Print Name)
Business Address:
Telephone.:
Email:
Fax:
INTERNAL USE ONLY
Section 00 41 00-11
1605.048/1-2024
A Joint Venture
Name of Joint Venture:
First Joint Venturer Name:
By:
(Signature of first joint venture partner -- attach evidence of authority to sign)
Name (typed or printed):
Title:
Business address:
Phone No.: Fax No.:
E-mail address :
Second Joint Venturer Name:
By:
(Signature of second joint venture partner -- attach evidence of authority to sign)
Name (typed or printed):
Title:
Business address:
Phone No.: Fax No.:
E-mail address :
Phone No., Fax No., and postal and E -mail address for receipt of official communications:
(Each joint venturer must sign. The manner of signing for each individual, partnership, and
corporation that is a party to the joint venture should be in the manner indicated above.)
Sworn and subscribed to before me this Notary Public or Other Officer
day of , Authorized to Administer Oaths.
My Commission expires:
END OF SECTION
INTERNAL USE ONLY
PENAL SUM FORM
EJCDC® C-430, Bid Bond (Penal Sum Form).
This document is a MODIFIED version ofEJCDC® C-430. Copyright© 2018 National Society of Professional Engineers, American Council of
Engineering Companies,and American Society of Civil Engineers. All rights reserved.
Page 1 of 2
10% BID BOND
Any singular reference to Bidder, Surety, Owner or other party shall be considered plural where applicable.
Bidder Surety
Name: [Full formal name of Bidder] Name: [Full formal name of Surety]
Address (principal place of business): Address (principal place of business):
[Address of Bidder’s principal place of business] [Address of Surety’s principal place of business]
Owner Bid
Name: [Full formal name of Owner] Project (name and location):
Address (principal place of business): [Owner project/contract name, and location of
the project][Address of Owner’s principal place of business]
Bid Due Date: [Enter date bid is due]
Bond
Penal Sum: [Amount]
Date of Bond: [Date]
Surety and Bidder, intending to be legally bound hereby, subject to the terms set forth in this Bid Bond,
do each cause this Bid Bond to be duly executed by an authorized officer, agent, or representative.
Bidder Surety
(Full formal name of Bidder) (Full formal name of Surety) (corporate seal)
By: By:
(Signature) (Signature) (Attach Power of
Attorney)Name: Name:
(Printed or typed) (Printed or typed)
Title: Title:
Attest: Attest:
(Signature) (Signature)
Name: Name:
(Printed or typed) (Printed or typed)
Title: Title:
Notes: (1) Note: Addresses are to be used for giving any required notice. (2) Provide execution by any
additional parties, such as joint venturers, if necessary.
INTERNAL USE ONLY
PENAL SUM FORM
EJCDC® C-430, Bid Bond (Penal Sum Form).
This document is a MODIFIED version ofEJCDC® C-430. Copyright© 2018 National Society of Professional Engineers, American Council of
Engineering Companies,and American Society of Civil Engineers. All rights reserved.
Page 2 of 2
1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors,
and assigns to pay to Owner upon default of Bidder the penal sum set forth on the face of this Bond.
Payment of the penal sum is the extent of Bidder’s and Surety’s liability. Recovery of such penal sum under
the terms of this Bond will be Owner’s sole and exclusive remedy upon default of Bidder.
2. Default of Bidder occurs upon the failure of Bidder to deliver within the time required by the Bidding
Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by
the Bidding Documents and any performance and payment bonds required by the Bidding Documents.
3. This obligation will be null and void if:
3.1.Owner accepts Bidder’s Bid and Bidder delivers within the time required by the Bidding Documents (or
any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding
Documents and any performance and payment bonds required by the Bidding Documents, or
3.2.All Bids are rejected by Owner, or
3.3.Owner fails to issue a Notice of Award to Bidder within the time specified in the Bidding Documents (or
any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when
required by Paragraph 5 hereof).
4. Payment under this Bond will be due and payable upon default of Bidder and within 30 calendar days after
receipt by Bidder and Surety of written notice of default from Owner, which notice will be given with
reasonable promptness, identifying this Bond and the Project and including a statement of the amount due.
5. Surety waives notice of any and all defenses based on or arising out of any time extension to issue Notice of
Award agreed to in writing by Owner and Bidder, provided that the total time for issuing Notice of Award
including extensions does not in the aggregate exceed 120 days from the Bid due date without Surety’s
written consent.
6. No suit or action will be commenced under this Bond prior to 30 calendar days after the notice of default
required in Paragraph 4 above is received by Bidder and Surety, and in no case later than one year after the
Bid due date.
7. Any suit or action under this Bond will be commenced only in a court of competent jurisdiction located in
the state in which the Project is located.
8. Notices required hereunder must be in writing and sent to Bidder and Surety at their respective addresses
shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier, or by
United States Postal Service registered or certified mail, return receipt requested, postage pre -paid, and will
be deemed to be effective upon receipt by the party concerned.
9. Surety shall cause to be attached to this Bond a current and effective Power of Attorney evidencing the
authority of the officer, agent, or representative who executed this Bond on behalf of Surety to execute,
seal, and deliver such Bond and bind the Surety thereby.
10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of
any applicable statute that has been omitted from this Bond will be deemed to be included herein as if set
forth at length. If any provision of this Bond conflicts with any applicable statute, then the provision of said
statute governs and the remainder of this Bond that is not in conflict therewith continues in full force and
effect.
11. The term “Bid” as used herein includes a Bid, offer, or proposal as applicable.
INTERNAL USE ONLY
EJCDC C-451, Qualifications Statement.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 1 of 7
QUALIFICATIONS STATEMENT
THE INFORMATION SUPPLIED IN THIS DOCUMENT IS CONFIDENTIAL TO THE EXTENT
PERMITTED BY LAWS AND REGULATIONS
ARTICLE 1— GENERAL INFORMATION
1.01 Provide contact information for the Business:
Legal Name of Business:
Corporate Office
Name: Phone number:
Title: Email address:
Business address of corporate office:
Local Office
Name: Phone number:
Title: Email address:
Business address of local office:
1.02 Provide information on the Business’s organizational structure:
Form of Business: ☐ Sole Proprietorship ☐ Partnership ☐ Corporation
☐ Limited Liability Company ☐ Joint Venture comprised of the following companies:
1.
2.
3.
Provide a separate Qualification Statement for each Joint Venturer.
Date Business was formed: State in which Business was formed:
Is this Business authorized to operate in the Project location? ☐ Yes ☐ No ☐ Pending
INTERNAL USE ONLY
EJCDC C-451, Qualifications Statement.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 2 of 7
1.03 Identify all businesses that own Business in whole or in part (25% or greater), or that are wholly or partly
(25% or greater) owned by Business:
Name of business: Affiliation:
Address:
Name of business: Affiliation:
Address:
Name of business: Affiliation:
Address:
1.04 Provide information regarding the Business’s officers, partners, and limits of authority.
Name: Title:
Authorized to sign contracts: ☐ Yes ☐ No Limit of Authority: $
Name: Title:
Authorized to sign contracts: ☐ Yes ☐ No Limit of Authority: $
Name: Title:
Authorized to sign contracts: ☐ Yes ☐ No Limit of Authority: $
Name: Title:
ARTICLE 2— LICENSING
2.01 Provide information regarding licensure for Business:
Name of License:
Licensing Agency:
License No: Expiration Date:
Name of License:
Licensing Agency:
License No: Expiration Date:
INTERNAL USE ONLY
EJCDC C-451, Qualifications Statement.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 3 of 7
ARTICLE 3— DIVERSE BUSINESS CERTIFICATIONS
3.01 Provide information regarding Business’s Diverse Business Certification, if any. Provide evidence of
current certification.
Certification Certifying Agency Certification
Date
☐ Disadvantaged Business Enterprise
☐ Minority Business Enterprise
☐ Woman-Owned Business Enterprise
☐ Small Business Enterprise
☐ Disabled Business Enterprise
☐ Veteran-Owned Business Enterprise
☐ Service-Disabled Veteran-Owned Business
☐ HUBZone Business (Historically
Underutilized) Business
☐ Other
☐ None
ARTICLE 4— SAFETY
4.01 Provide information regarding Business’s safety organization and safetyperformance.
Name of Business’s Safety Officer:
Safety Certifications
Certification Name Issuing Agency Expiration
4.02 Provide Worker’s Compensation Insurance Experience Modification Rate (EMR), Total Recordable
Frequency Rate (TRFR) for incidents, and Total Number of Recorded Manhours (MH) for the last 3 years
and the EMR, TRFR, and MH history for the last 3 years of any proposed Subcontractor(s) that will
provide Work valued at 10% or more of the Contract Price. Provide documentation of the EMR history
for Business and Subcontractor(s).
Year
Company EMR TRFR MH EMR TRFR MH EMR TRFR MH
INTERNAL USE ONLY
EJCDC C-451, Qualifications Statement.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 4 of 7
ARTICLE 5— FINANCIAL
5.01 Provide information regarding the Business’s financial stability. Provide the most recent audited financial
statement, and if such audited financial statement is not current, also provide the most current financial
statement.
Financial Institution:
Business address:
Date of Business’s mostrecent financial statement: ☐ Attached
Date of Business’s mostrecent audited financial statement: ☐ Attached
Financial indicators from the most recent financial statement
Contractor’s Current Ratio (Current Assets ÷ Current Liabilities)
Contractor’s Quick Ratio ((Cash and CashEquivalents + Accounts Receivable +
Short Term Investments) ÷ Current Liabilities)
ARTICLE 6— SURETY INFORMATION
6.01 Provide information regarding the surety company that will issue required bonds on behalf of the
Business, including but not limited to performance and payment bonds.
Surety Name:
Surety is a corporation organized and existing under the laws of the state of:
Is surety authorized to provide surety bonds in the Project location? ☐ Yes ☐ No
Is surety listed in “Companies Holding Certificates of Authority as Acceptable Sureties on
Federal Bonds and as Acceptable Reinsuring Companies” published inDepartment Circular 570
(as amended) by the Bureau of the Fiscal Service, U.S. Department of the Treasury?
☐ Yes ☐ No
Mailing Address
(principal place of business):
Physical Address
(principal place of business):
Phone (main): Phone (claims):
INTERNAL USE ONLY
EJCDC C-451, Qualifications Statement.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 5 of 7
ARTICLE 7— INSURANCE
7.01 Provide information regarding Business’s insurance company(s), including but not limited to its
Commercial General Liability carrier. Provide information for each provider.
Name of insurance provider, and type of policy (CLE, auto, etc.):
Insurance Provider Type of Policy (Coverage Provided)
Are providers licensed or authorized to issue policies in the Project location? ☐ Yes ☐ No
Does provider have an A.M. Best Rating of A-VII or better? ☐ Yes ☐ No
Mailing Address
(principal place of business):
Physical Address
(principal place of business):
Phone (main): Phone (claims):
ARTICLE 8— CONSTRUCTION EXPERIENCE
8.01 Provide information that will identify the overall size and capacity of the Business.
Average number of current full-time employees:
Estimate of revenue for the current year:
Estimate of revenue for the previous year:
8.02 Provide information regarding the Business’s previous contracting experience.
Years of experience with projects like the proposed project:
As a general contractor: As a joint venturer:
Has Business, or a predecessor in interest, or an affiliate identified in Paragraph 1.03:
Been disqualified as a bidder by any local, state, or federal agency within the last 5 years?
☐ Yes ☐ No
Been barred from contracting by any local, state, or federal agency within the last 5 years?
☐ Yes ☐ No
Been released from a bid in the past 5 years? ☐ Yes ☐ No
Defaulted on a project or failed to complete any contract awarded to it? ☐ Yes ☐ No
Refused to construct or refused to provide materials defined in the contract documents or in
a change order? ☐ Yes ☐ No
Been a party to any currently pending litigation or arbitration? ☐ Yes ☐ No
Provide full details in a separate attachment if the response to any of these questions is Yes.
INTERNAL USE ONLY
EJCDC C-451, Qualifications Statement.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 6 of 7
8.03 List all projects currently under contract in Schedule A and provide indicated information.
8.04 List a minimum of three and a maximum of six projects completed in the last 5 years in Schedule B and
provide indicated information to demonstrate the Business’s experience with projects similar in type
and cost of construction.
8.05 In Schedule C, provide information on key individuals whom Business intends to assign to the Project.
Provide resumes for those individuals included in Schedule C. Key individuals include the Project
Manager, Project Superintendent, Quality Manager, and Safety Manager. Resumes may be provided for
Business’s key leaders as well.
ARTICLE 9— REQUIRED ATTACHMENTS
9.01 Provide the following information with the Statement of Qualifications:
A. If Business is a Joint Venture, separate Qualifications Statements for each Joint Venturer, as
required in Paragraph 1.02.
B. Diverse Business Certifications if required by Paragraph 3.01.
C. Certification of Business’s safety performance if required by Paragraph4.02.
D. Financial statements as required by Paragraph 5.01.
E. Attachments providing additional information as required by Paragraph 8.02.
F. Schedule A (Current Projects) as required by Paragraph 8.03.
G. Schedule B (Previous Experience with Similar Projects) as required by Paragraph 8.04.
H. Schedule C (Key Individuals) and resumes for the key individuals listed, as required by
Paragraph 8.05.
I. Additional items as pertinent.
INTERNAL USE ONLY
EJCDC C-451, Qualifications Statement.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 7 of 7
This Statement of Qualifications isoffered by:
Business:
(typed or printed name of organization)
By:
(individual’s signature)
Name:
(typed or printed)
Title:
(typed or printed)
Date:
(date signed)
(If Business is a corporation, a partnership, or a joint venture, attach evidence of authority tosign.)
Attest: (individual’ssignature)
Name: (typed or printed)
Title:
(typed or printed)
Address for giving notices:
Designated Representative:
Name:
(typed or printed)
Title:
(typed or printed)
Address:
Phone:
Email:
INTERNAL USE ONLY
EJCDC® C-451, Qualifications Statement— Schedule A— Current Projects.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 1 of 1
Schedule A— Current Projects
Name of Organization
Project Owner Project Name
General Description of Project
Project Cost Date Project
CompletedKey Project Personnel Project Manager Project Superintendent Safety Manager Quality Control Manager
Name
Reference Contact Information (listing names indicates approval to contacting the names individuals as a reference)
Name Title/Position Organization Telephone Email
Owner
Designer
Construction Manager
Project Owner Project Name
General Description of Project
Project Cost Date Project
CompletedKey Project Personnel Project Manager Project Superintendent Safety Manager Quality Control Manager
Name
Reference Contact Information (listing names indicates approval to contacting the names individuals as a reference)
Name Title/Position Organization Telephone Email
Owner
Designer
Construction Manager
Project Owner Project Name
General Description of Project
Project Cost Date Project
CompletedKey Project Personnel Project Manager Project Superintendent Safety Manager Quality Control Manager
Name
Reference Contact Information (listing names indicates approval to contacting the names individuals as a reference)
Name Title/Position Organization Telephone Email
Owner
Designer
Construction Manager
INTERNAL USE ONLY
EJCDC® C-451, Qualifications Statement— Schedule B— Previous Experience with Similar Projects.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 1 of 2
Schedule B— Previous Experience with Similar Projects
Name of Organization
Project Owner Project Name
General Description of Project
Project Cost Date Project
CompletedKey Project Personnel Project Manager Project Superintendent Safety Manager Quality Control Manager
Name
Reference Contact Information (listing names indicates approval to contacting the names individuals as a reference)
Name Title/Position Organization Telephone Email
Owner
Designer
Construction Manager
Project Owner Project Name
General Description of Project
Project Cost Date Project
CompletedKey Project Personnel Project Manager Project Superintendent Safety Manager Quality Control Manager
Name
Reference Contact Information (listing names indicates approval to contacting the names individuals as a reference)
Name Title/Position Organization Telephone Email
Owner
Designer
Construction Manager
Project Owner Project Name
General Description of Project
Project Cost Date Project
CompletedKey Project Personnel Project Manager Project Superintendent Safety Manager Quality Control Manager
Name
Reference Contact Information (listing names indicates approval to contacting the names individuals as a reference)
Name Title/Position Organization Telephone Email
Owner
Designer
Construction Manager
INTERNAL USE ONLY
EJCDC® C-451, Qualifications Statement— Schedule B— Previous Experience with Similar Projects.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 2 of 2
Schedule B— Previous Experience with Similar Projects
Name of Organization
Project Owner Project Name
General Description of Project
Project Cost Date Project
CompletedKey Project Personnel Project Manager Project Superintendent Safety Manager Quality Control Manager
Name
Reference Contact Information (listing names indicates approval to contacting the names individuals as a reference)
Name Title/Position Organization Telephone Email
Owner
Designer
Construction Manager
Project Owner Project Name
General Description of Project
Project Cost Date Project
CompletedKey Project Personnel Project Manager Project Superintendent Safety Manager Quality Control Manager
Name
Reference Contact Information (listing names indicates approval to contacting the names individuals as a reference)
Name Title/Position Organization Telephone Email
Owner
Designer
Construction Manager
Project Owner Project Name
General Description of Project
Project Cost Date Project
CompletedKey Project Personnel Project Manager Project Superintendent Safety Manager Quality Control Manager
Name
Reference Contact Information (listing names indicates approval to contacting the names individuals as a reference)
Name Title/Position Organization Telephone Email
Owner
Designer
Construction Manager
INTERNAL USE ONLY
EJCDC® C-451, Qualifications Statement— Schedule C— Key Individuals.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 1 of 2
Schedule C— Key Individuals
Project Manager
Name of individual
Years of experience as project manager
Years of experience with this organization
Number of similar projects as project manager
Number of similar projects in other positions
Current Project Assignments
Name of assignment Percent of time used for
this project
Estimated project
completion date
Reference Contact Information (listing names indicates approval to contact named individuals as a reference)
Name Name
Title/Position Title/Position
Organization Organization
Telephone Telephone
Email Email
Project Project
Candidate’s role on
project
Candidate’s role on
project
Project Superintendent
Name of individual
Years of experience as project superintendent
Years of experience with this organization
Number of similar projects as project superintendent
Number of similar projects in other positions
Current Project Assignments
Name of assignment Percent of time used for
this project
Estimated project
completion date
Reference Contact Information (listing names indicates approval to contact named individuals as a reference)
Name Name
Title/Position Title/Position
Organization Organization
Telephone Telephone
Email Email
Project Project
Candidate’s
role on project
Candidate’s
role on project
INTERNAL USE ONLY
EJCDC® C-451, Qualifications Statement— Schedule C— Key Individuals.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 2 of 2
Safety Manager
Name of individual
Years of experience as project manager
Years of experience with this organization
Number of similar projects as project manager
Number of similar projects in other positions
Current Project Assignments
Name of assignment Percent of time used for
this project
Estimated project
completion date
Reference Contact Information (listing names indicates approval to contact named individuals as a reference)
Name Name
Title/Position Title/Position
Organization Organization
Telephone Telephone
Email Email
Project Project
Candidate’s role on
project
Candidate’s role on
project
Quality Control Manager
Name of individual
Years of experience as project superintendent
Years of experience with this organization
Number of similar projects as project superintendent
Number of similar projects in other positions
Current Project Assignments
Name of assignment Percent of time used for
this project
Estimated project
completion date
Reference Contact Information (listing names indicates approval to contact named individuals as a reference)
Name Name
Title/Position Title/Position
Organization Organization
Telephone Telephone
Email Email
Project Project
Candidate’s
role on project
Candidate’s
role on project
INTERNAL USE ONLY
Section 00 52 00-1
1605.048/1-2024
SECTION 00 52 00
AGREEMENT
THIS AGREEMENT is by and between
(hereinafter called OWNER) and
(hereinafter called CONTRACTOR).
Terms used in this Agreement hav e the meanings stated in the General Conditions and the
Supplementary Conditions.
OWNER and CONTRACTOR, in consideration of the mutual covenants set forth herein, agree as
follows:
Article 1. WORK
1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents.
The Work is generally described as follows:
Article 2. THE PROJECT
2.01 The Project for which the Work under the Contract Documents may be the whole or only a
part is generally described as follows:
Article 3. ENGINEER
3.01 OWNER has retained Strand Associates, Inc .® (“ENGINEER”) to act as OWNER’s
representative, assume all duties and responsibilities of ENGINEER, and have the rights and
authority assigned to ENGINEER in the Contract.
3.02 The part of the Project that pertains to the Work has been designed by ENGINEER.
INTERNAL USE ONLY
Section 00 52 00-2
1605.048/1-2024
Article 4. CONTRACT TIMES
4.01 Time of the Essence
A. All time limits for Milestones, if any, Substantial Completion, and completion and
readiness for final payment as stated in the Contract Documents are of the essence of the Contract.
4.02 Dates for Substantial Completion and Final Payment
A. The Work will be substantially complete on or before June 2 7, 2025, and will be
completed and ready for final payment in accordance with Paragraph 15.06 of the General
Conditions on or before July 11, 2025.
4.03 Liquidated Damages
A. CONTRACTOR and OWNER recognize that time is of the essence as stated in
Paragraph 4.01 above and that OWNER will suffer financial and other losses if the Work is not completed
and Milestones not achieved within the Contract Times, as duly modified. The parties also recognize the
delays, expense, and difficulties involved in proving, in a legal or arbitration proceeding, the actual loss
suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such
proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty):
1. Substantial Completion: CONTRACTOR shall pay OWNER $1,000 for each
day that expires after the time (as duly adjusted pursuant to the Contract) specified in
Paragraph 4.02.A above for Substantial Completion until the Work is substantially complete.
2. Completion of Remaining Work: After Substantial Completion, if
CONTRACTOR shall neglect, refuse, or fail to complete the remaining Work within the
Contract Time (as duly adjusted pursuant to the Contract) for completion and readiness for
final payment, CONTRACTOR shall pay OWNER $1,000 for each day that expires after such
time until the Work is completed and ready for final payment.
3. Liquidated damages for failing to timely attain Milestones, Substantial
Completion, and final completion are not additive, and will not be imposed concurrently.
Article 5. CONTRACT PRICE
5.01 OWNER shall pay CONTRACTOR for completion of the Work in accordance with the Contract
Documents an amount in current funds as follows , subject to adjustment under the Contract:
A. For all Work, at the prices stated in CONTRACTOR ’s Bid, attached hereto as an
exhibit.
B. All specific Cash Allowances are included in the Contract Price and have been
computed in accordance with Paragraph 13.02 of the General Conditions.
INTERNAL USE ONLY
Section 00 52 00-3
1605.048/1-2024
Article 6. PAYMENT PROCEDURES
6.01 Submittal and Processing of Payments
A. CONTRACTOR shall submit Applications for Payment in accordance with Article15 of the
General Conditions. Applications for Payment will be processed by ENGINEER as provided in the
General Conditions.
6.02 Progress Payments; Retainage
A. OWNER shall make progress payments on account of the Contract Price on the basis of
CONTRACTOR’s Applications for Payment as established at the preconstruction conference during
performance of the Work as provided in Paragraphs6.02.A.1 and 6.02.A.2 below.All such payments will
be measured by the schedule of values established in Paragraph 2.05.A of the General Conditions (and
in the case of Unit Price Work based on the number of units completed) or, in the event there is no
schedule of values, as provided in the General Requirements:
1. Prior to Substantial Completion, OWNER will retain an amount equal to 5% of
each progress payment application until 50% of the Work has been completed. At
50% completion, further progress payment applications shall be paid in full to CONTRACTOR
and no additional amounts will be retained unless ENGINEER certifies to OWNER that the
job is not proceeding satisfactorily. Amounts previously retained shall not be paid to
CONTRACTOR until substantial completion of the Work. At 50% completion of the Work, or
any time thereafter when the character and progress of the Work is not satisfactory to
OWNER on recommendation of ENGINEER, additional amounts may be retained, but in no
event shall the total retainage be more than 10% of the value of the work completed.
2. Upon Substantial Completion, OWNER shall pay an amount sufficient to
increase total payments to CONTRACTOR to 98% of the Work completed, less such amounts
as ENGINEER shall determine in accordance with Paragraph 15.01.C.5 and 15.01.C.6 of the
General Conditions and less 100% of ENGINEER’s estimate of the value of Work to be
completed or corrected as shown on the tentative list of items to be completed or corrected
attached to the certificate of Substantial Completion.
6.03 Final Payment
A. Upon final completion and acceptance of the Work in accordance with
Paragraph 15.06 of the General Conditions, OWNER shall pay the remainder of the Contract Price
as recommended by ENGINEER as provided in said Paragraph 15.06.
6.04 Consent of Surety
A. OWNER will not make final payment unless CONTRACTOR submits written consent of
the surety to such payment.
Article 7. HIERARCHY
7.01 In resolving inconsistencies among two or more sections of the Contract Documents, precedence
shall be given in the following order:
First: WRITTEN AMENDMENTS
Second: CHANGE ORDERS/FIELD ORDERS/WORK CHANGE DIRECTIVES
INTERNAL USE ONLY
Section 00 52 00-4
1605.048/1-2024
Third: ADDENDA
Fourth: AGREEMENT
Fifth: SUPPLEMENTARY CONDITIONS
Sixth: GENERAL CONDITIONS
Seventh: SPECIFICATIONS
Eighth: DRAWINGS
For categories that have the same order of precedence, the document that includes the latest date shall
control. Figure dimensions (numerical) on Drawings shall take precedence over dimensions measured
utilizing a scale.
Article 8. REPRESENTATIONS, CERTIFICATIONS, AND STIPULATIONS
8.01 CONTRACTOR’s Representations
A. In order to induceOWNER to enter into this Contract,CONTRACTOR makes the following
representations:
1. CONTRACTOR has examined and carefully studied the Contract Documents,
including Addenda.
2. CONTRACTOR has visited the Site, conducted a thorough visual examination of
the Site and adjacent areas, and become familiar with the general, local, and Site conditions that
may affect cost, progress, and performance of the Work.
3. CONTRACTOR is familiar with all Laws and Regulations that may affect cost,
progress, and performance of the Work.
4. CONTRACTOR has carefully studied the reports of explorations and tests of
subsurface conditions at or adjacent to the Site and the drawings of physical conditions relating
to existing surface or subsurface structures at the Site , if any, that have been identified in the
Supplementary Conditions, with respect to the Technical Data in such reports and drawings.
5. CONTRACTOR has carefully studied the reports and drawings relating to
Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified
in the Supplementary Conditions, with respect to Technical Data in such reports and drawings.
6. CONTRACTOR has considered the information known to CONTRACTOR itself;
information commonly known to contractors doing business in the locality of the Site; information
and observations obtained from visits to the Site; the Contract Documents; and the Technical
Data identified in the Supplementary Conditions or by definition, with respect to the effect of such
information, observations, and Technical Data on (a) the cost, progress, and performance of the
Work; (b) the means, methods, techniques, sequences , and procedures of construction to be
employed by CONTRACTOR; and (c) CONTRACTOR's safety precautions and programs.
7. Based on the information and observations referred to in the preceding paragraph,
CONTRACTOR agrees that no further examinations, investigations, explorations, tests, studies,
or data are necessary for the performance of the Work at the Contract Price, within the Contract
Times, and in accordance with the other terms and conditions of the Contract.
8. CONTRACTOR is aware of the general nature of work to be performed byOWNER
and others at the Site that relates to the Work as indicated in the Contract Documents.
INTERNAL USE ONLY
Section 00 52 00-5
1605.048/1-2024
9. CONTRACTOR has given ENGINEER written notice of all conflicts, errors,
ambiguities, or discrepancies that CONTRACTOR has discovered in the Contract Documents,
and of discrepancies between Site conditions and the Contract Documents, and the written
resolution thereof by ENGINEER is acceptable to CONTRACTOR.
10. The Contract Documents are generally sufficient to indicate and convey
understanding of all terms and conditions for performance and furnishing of the Work.
11. CONTRACTOR's entry into this Contract constitutes an incontrovertible
representation by CONTRACTOR that without exception all prices in the Agreement are premised
upon performing and furnishing the Work required by the Contract Documents.
8.02 CONTRACTOR’s Certifications
A. CONTRACTOR certifies that it has not engaged in corrupt, fraudulent, collusive, or
coercive practices in competing for or in executing the Contract. For the purposes of this
Paragraph 8.02:
1. "corrupt practice" means the offering, giving, receiving, or soliciting of anything
of value likely to influence the action of a public official in the bidding process or in the
Contract execution;
2. "fraudulent practice" means an intentional misrepresentation of facts made
(a) to influence the bidding process or the execution of the Contract to the detriment of
OWNER, (b) to establish Bid or Contract prices at artificial non -competitive levels, or (c) to
deprive OWNER of the benefits of free and open competition;
3. "collusive practice" means a scheme or arrangement between two or more
Bidders, with or without the knowledge of OWNER, a purpose of which is to establish Bid
prices at artificial, non -competitive levels; and
4. "coercive practice" means harming or threatening to harm, directly or indirectly,
persons or their property to influence their participation in the bidding process or affect the
execution of the Contract.
Article 9. CONTRACT DOCUMENTS
9.01 Contents
A. The Contract Documents consist of the following:
1. This Agreement (pages 00 52 00-1 through 00 52 00- , inclusive);
2. Performance bond (pages 00 61 13.13-1 through 00 61 13.13-4, inclusive);
3. Payment bond (pages 00 61 13.16-1 through 00 61 13.16-4, inclusive);
4. Other bonds
a. (pages to , inclusive);
INTERNAL USE ONLY
Section 00 52 00-6
1605.048/1-2024
b. (pages to , inclusive);
c. (pages to , inclusive);
5. General Conditions (pages 00 72 00-1 through 00 72 00- , inclusive);
6. Supplementary Conditions (pages 00 73 00-1 through 00 73 00- , inclusive);
7. Specifications as listed in the table of contents of the Project Manual;
8. Drawings–Sheets No. through No.
inclusive incorporated herein by reference with each sheet bearing the following
general title:
as well as drawings listed in the table of contents that are bound at the back of these
Specifications.
9. Addenda ( ).
10. Exhibits to this Agreement (enumerated as follows:)
a. CONTRACTOR’s Bid (pages to );
b. Documentation submitted by CONTRACTOR prior to Notice of Award
( );
c. ( );
11. The following may be delivered or issued on or after the Effective Date of the
Contract and are not attached hereto:
a. Notice to Proceed (pages {_______} to {_______}, inclusive);
b. Erosion Control Certification (pages {_______} to {_______}, inclusive);
c. Work Change Directives (not attached to this Agreement);
d. Change Order(s) (not attached to this Agreement);
e. Warranty Bond, if any.
INTERNAL USE ONLY
Section 00 52 00-7
1605.048/1-2024
B. The Contract D ocuments listed in Paragraph 9.01.A are attached to this Agreement
(except as expressly noted otherwise above).
C. There are no Contract Documents other than those listed above in this Article 9.
D. The Contract Documents may only be amended, modified, or supplemented as
provided in Paragraph 11.01 of the General Conditions.
Article 10. MISCELLANEOUS
10.01 Severability
A. Any provision or part of the Contract Documents held to be void or unenforceable
under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue
to be valid and binding upon OWNER and CONTRACTOR, who agree that the Cont ract Documents
shall be reformed to replace such stricken provision or part thereof with a valid and enforceable
provision that comes as close as possible to expressing the intention of the stricken provision.
10.02 Integration
A. The parties’ entire agreement is contained in the Contract Documents, and the provisions
of the Contract Documents supersede all prior discussions or writings between the parties.
INTERNAL USE ONLY
Section 00 52 00-8
1605.048/1-2024
IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement in duplicate.
One counterpart each has been delivered to OWNER and CONTRACTOR. All portions of the Contract
Documents have been signed or identified by OWNER and CONTRACTOR or identified by ENGINEER
on their behalf.
This Agreement will be effective on ___________________________________________, _____ (which
is the Effective Date of the Contract).
OWNER
Signature and Title
ATTEST:
By:
Signature and Title
Address for Giving Notices:
Name:
Street:
City, State, Zip Code:
Phone:
Facsimile:
E-mail:
Designated Representative:
INTERNAL USE ONLY
Section 00 52 00-9
1605.048/1-2024
CONTRACTOR
Signature and Title
ATTEST:
By:
Signature and Title
Address for Giving Notices:
Name:
Street:
City, State, Zip Code:
Phone:
Facsimile:
E-mail:
Designated Representative:
License No.:
(Where applicable)
(If CONTRACTOR is a corporation, limited liability company, or a partnership, attach evidence of authority
to sign.)
INTERNAL USE ONLY
Section 00 52 00-10
1605.048/1-2024
Approved as to form:
___
OWNER’s Attorney Date
Provision has been made to pay the liability that will accrue under this Agreement:
Countersigned:
___
OWNER’s Comptroller or Treasurer Date
INTERNAL USE ONLY
Section 00 52 00-11
1605.048/1-2024
INSTRUCTIONS FOR EXECUTING CONTRACT
The full name and business address ofCONTRACTOR should be inserted and the Agreement should be
signed with CONTRACTOR’s official signature. Please have the name of the signing party printed under
all signatures to the Agreement.
If CONTRACTOR is operating as a partnership, each partner should sign the Agreement. If the
Agreement is not signed by each partner, there should be attached to the Agreement a duly authenticated
power of attorney evidencing the signer’s (signers’) authority to sign such Agreement for and on behalf
of the partnership.
If CONTRACTOR is an individual, the trade name (if CONTRACTOR is operating under a trade name)
should be indicated in the Agreement and the Agreement should be signed by such individual. If signed
by other than CONTRACTOR, there should be attached to the Agreement a duly authenticated power of
attorney evidencing the signer’s authority to execute such Agreement for and on behalf of
CONTRACTOR.
If CONTRACTOR is operating as a limited liability company, and it is member -managed, each member
should sign the Agreement, or an authorized member should sign. If the LLC is manager -managed, an
authorized manager should sign. If the Agreement is not signed by each member, there should be
attached to the Agreement a duly authenticated power of attorney evidencing the signer’s (signers’)
authority to sign such Agreement for and on behalf of the LLC.
If CONTRACTOR is a corporation, the Secretary of the corporation should sign the certificate below. If
the Agreement itself is signed by the Secretary of the corporation, the certificate below should be
executed by some other officer of the corporation. In lieu of the following certificate,there may be attached
to the Agreement copies of so much of the records of the corporation which will show the official character
and authority of the officers signing, duly certified by the Secretary or Assistant Secret ary to be true
copies.
I, ___________________________________, certify that I am the _____________________________
(Print Name) (Title of Individual Signing This Certificate)
of the corporation named as CONTRACTOR herein above; that ______________________________,
(Print Name of Officer Signing Agreement)
who signed the foregoing Agreement on behalf of CONTRACTOR was then
____________________________________ of said corporation; that said Agreement was duly signed
(Title of Officer Signing Agreement)
for and on behalf of said Corporation by authority of its governing body, and is within the scope of its
corporate powers.
(Individual Signature)
END OF SECTION
INTERNAL USE ONLY
Section 00 55 00-1
1605.048/1-2024
SECTION 00 55 00
NOTICE TO PROCEED
Dated:
TO:
(CONTRACTOR)
ADDRESS:
PROJECT:
OWNER’S CONTRACT NO.:
CONTRACT FOR:
(Insert name of Contract as it appears in the Bidding Documents)
You are notified that the Contract Time under the above C ontract will commence to run on _____
day of ____________________, 20___. On that date, you are to start performing your obligations
under the Contract Documents .
Before you may start any work at the site, Paragraph 2.01.B of the General Conditions provides
that you must deliver to OWNER (with copies to ENGINEER and other identified additional
insureds) certificates of insurance, copies of endorsements, and other evidence of insurance which
you are required to purchase and maintain in accordance with the Contract Documents.
Also before you may start any work at the site, you must
(Add Other Requirements)
(OWNER)
By:
(Authorized Signature)
(Title)
END OF SECTION
INTERNAL USE ONLY
Section 00 55 10-1
1605.048/1-2024
SECTION 00 55 10
EROSION CONTROL CERTIFICATION
Dated:
TO:
(OWNER)
ADDRESS:
PROJECT:
OWNER’S CONTRACT NO.:
CONTRACT FOR:
(Insert name of Contract as it appears in the Bidding Documents)
I certify under penalty of law that I understand the terms and conditions of the General National Pollutant
Discharge Elimination System (NPDES) Permit that authorizes the stormwater discharges associated
with industrial activities from the construction site and as may be detailed in the Contract Documents.
I agree to indemnify and hold OWNER harmless from any claims, demands, suits, causes of action,
settlements, fines, or judgments and the costs of litigation, including, but not limited to, reasonable
attorneys fees and costs of investigation and arising fr om a condition, obligation, or requirement
assumed or to be performed by CONTRACTOR for storm water pollution and erosion control.
Fines and other costs incurred against OWNER for CONTRACTOR’s failure to provide the required
erosion control practices will be paid by CONTRACTOR.
(CONTRACTOR)
By:
(Authorized Signature)
(Title)
END OF SECTION
INTERNAL USE ONLY
EJCDC® C-610, Performance Bond.
This document is a MODIFIED version ofEJCDC® C-610.
Copyright© 2018 National Society of Professional Engineers, American Council ofEngineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 1 of 4
PERFORMANCE BOND
Contractor Surety
Name: [Full formal name of Contractor] Name: [Full formal name of Surety]
Address (principal place of business): Address (principal place of business):
[Address of Contractor’s principal place of
business]
[Address of Surety’s principal place of business]
Owner Contract
Name: [Full formal name of Owner] Description (name and location):
Mailing address (principal place of business): [Owner’s project/contract name, and location of
the project][Address of Owner’s principal place of business]
Contract Price: [Amount from Contract]
Effective Date of Contract: [Date from Contract]
Bond
Bond Amount: [Amount]
Date of Bond: [Date]
(Date of Bond cannot be earlier than Effective Date of Contract)
Modifications to this Bond form:
☐ None ☐ See Paragraph 16
Surety and Contractor, intending to be legally bound hereby, subject to the terms set forth in this
Performance Bond, do each cause this Performance Bond to be duly executed by an authorized officer,
agent, or representative.
Contractor as Principal Surety
(Full formal name of Contractor) (Full formal name of Surety) (corporate seal)
By: By:
(Signature) (Signature)(Attach Power of Attorney)
Name: Name:
(Printed or typed) (Printed or typed)
Title: Title:
Attest: Attest:
(Signature) (Signature)
Name: Name:
(Printed or typed) (Printed or typed)
Title: Title:
Notes: (1) Provide supplemental execution by any additional parties, such as joint venturers. (2) Any singular reference to
Contractor, Surety, Owner, or other party is considered plural where applicable.
INTERNAL USE ONLY
EJCDC® C-610, Performance Bond.
This document is a MODIFIED version ofEJCDC® C-610.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 2 of 4
1. The Contractor and Surety, jointly and severally, bind themselves, their heirs, executors,
administrators, successors, and assigns to the Owner for the performance of the Construction
Contract, which is incorporated herein by reference.
2. If the Contractor performs the Construction Contract, the Surety and the Contractor shall have no
obligation under this Bond, except when applicable to participate in a conference as provided in
Paragraph 3.
3. If there is no Owner Default under the Construction Contract, the Surety’s obligation under this
Bond will arise after:
3.1.The Owner first provides notice to the Contractor and the Surety that the Owner is considering
declaring a Contractor Default. Such notice may indicate whether the Owner is requesting a
conference among the Owner, Contractor, and Surety to discuss the Contractor’s
performance. If the Owner does not request a conference, the Surety may, within five (5)
business days after receipt of the Owner’s notice, request such a conference. If the Surety
timely requests a conference, the Owner shall attend. Unless the Owner agrees otherwise, any
conference requested under this Paragraph 3.1 will be held within ten (10) business days of
the Surety’s receipt of the Owner’s notice. If the Owner, the Contractor, and the Surety agree,
the Contractor shall be allowed a reasonable time to perform the Construction Contract, but
such an agreement does not waive the Owner’s right, if any, subsequently to declare a
Contractor Default;
3.2.The Owner declares a Contractor Default, terminates the Construction Contract and notifies the
Surety; and
3.3.The Owner has agreed to pay the Balance of the Contract Price in accordance with the terms of
the Construction Contract to the Surety or to a contractor selected to perform the
Construction Contract.
4. Failure on the part of the Owner to comply with the notice requirement in Paragraph 3.1 does not
constitute a failure to comply with a condition precedent to the Surety’s obligations, or release the
Surety from its obligations, except to the extent the Surety demonstrates actual prejudice.
5. When the Owner has satisfied the conditions of Paragraph 3, the Surety shall promptly and at the
Surety’s expense take one of the following actions:
5.1.Arrange for the Contractor, with the consent of the Owner, to perform and complete the
Construction Contract;
5.2.Undertake to perform and complete the Construction Contract itself, through its agents or
independent contractors;
5.3.Obtain bids or negotiated proposals from qualified contractors acceptable to the Owner for a
contract for performance and completion of the Construction Contract, arrange for a contract
to be prepared for execution by the Owner and a contractor selected with the Owners
concurrence, to be secured with performance and payment bonds executed by a qualified
surety equivalent to the bonds issued on the Construction Contract, and pay to the Owner the
amount of damages as described in Paragraph 7 in excess of the Balance of the Contract Price
incurred by the Owner as a result of the Contractor Default; or
INTERNAL USE ONLY
EJCDC® C-610, Performance Bond.
This document is a MODIFIED version ofEJCDC® C-610.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 3 of 4
5.4.Waive its right to perform and complete, arrange for completion, or obtain a new contractor,
and with reasonable promptness under the circumstances:
5.4.1 After investigation, determine the amount for which it may be liable to the Owner
and, as soon as practicable after the amount is determined, make payment to the
Owner; or
5.4.2 Deny liability in whole or in part and notify the Owner, citing the reasons for denial.
6. If the Surety does not proceed as provided in Paragraph 5 with reasonable promptness, the Surety
shall be deemed to be in default on this Bond seven days after receipt of an additional written
notice from the Owner to the Surety demanding that the Surety perform its obligations under this
Bond, and the Owner shall be entitled to enforce any remedy available to the Owner. If the Surety
proceeds as provided in Paragraph 5.4, and the Owner refuses the payment, or the Surety has
denied liability, in whole or in part, without further notice, the Owner shall be entitled to enforce
any remedy available to the Owner.
7. If the Surety elects to act under Paragraph 5.1, 5.2, or 5.3, then the responsibilities of the Surety to
the Owner will not be greater than those of the Contractor under the Construction Contract, and the
responsibilities of the Owner to the Surety will not be greater than those of the Owner under the
Construction Contract. Subject to the commitment by the Owner to pay the Balance of the Contract
Price, the Surety is obligated, without duplication for:
7.1.the responsibilities of the Contractor for correction of defective work and completion of the
Construction Contract;
7.2.additional legal, design professional, and delay costs resulting from the Contractor’s Default,
and resulting from the actions or failure to act of the Surety under Paragraph 5; and
7.3.liquidated damages, or if no liquidated damages are specified in the Construction Contract,
actual damages caused by delayed performance or non-performance of the Contractor.
8. If the Surety elects to act under Paragraph 5.1, 5.3, or 5.4, the Surety’s liability is limited to the
amount of this Bond.
9. The Surety shall not be liable to the Owner or others for obligations of the Contractor that are
unrelated to the Construction Contract, and the Balance of the Contract Price will not be reduced or
set off on account of any such unrelated obligations. No right of action will accrue on this Bond to
any person or entity other than the Owner or its heirs, executors, administrators, successors, and
assigns.
10. The Surety hereby waives notice of any change, including changes of time, to the Construction
Contract or to related subcontracts, purchase orders, and other obligations.
11. Any proceeding, legal or equitable, under this Bond must be instituted in any court of competent
jurisdiction in the location in which the work or part of the work is located and must be instituted
within two years after a declaration of Contractor Default or within two years after the Contractor
ceased working or within two years after the Surety refuses or fails to perform its obligations under
this Bond, whichever occurs first. If the provisions of this paragraph are void or prohibited by law,
the minimum periods of limitations available to sureties as a defense in the jurisdiction of the suit
will be applicable.
INTERNAL USE ONLY
EJCDC® C-610, Performance Bond.
This document is a MODIFIED version ofEJCDC® C-610.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 4 of 4
12. Notice to the Surety, the Owner, or the Contractor must be mailed or delivered to the address
shown on the page on which their signature appears.
13. When this Bond has been furnished to comply with a statutory or other legal requirement in the
location where the construction was to be performed, any provision in this Bond conflicting with
said statutory or legal requirement will be deemed deleted therefrom and provisions conforming to
such statutory or other legal requirement will be deemed incorporated herein. When so furnished,
the intent is that this Bond will be construed as a statutory bond and not as a common law bond.
14. Definitions
14.1. Balance of the Contract Price — The total amount payable by the Owner to the Contractor
under the Construction Contract after all proper adjustments have been made including
allowance for the Contractor for any amounts received or to be received by the Owner in
settlement of insurance or other claims for damages to which the Contractor is entitled,
reduced by all valid and proper payments made to or on behalf of the Contractor under the
Construction Contract.
14.2. Construction Contract— The agreement between the Owner and Contractor identified on the
cover page, including all Contract Documents and changes made to the agreement and the
Contract Documents.
14.3. Contractor Default — Failure of the Contractor, which has not been remedied or waived, to
perform or otherwise to comply with a material term of the Construction Contract.
14.4. Owner Default — Failure of the Owner, which has not been remedied or waived, to pay the
Contractor as required under the Construction Contract or to perform and complete or
comply with the other material terms of the Construction Contract.
14.5. Contract Documents — All the documents that comprise the agreement between the Owner
and Contractor.
15. If this Bond is issued for an agreement between a contractor and subcontractor, the term
Contractor in this Bond will be deemed to be Subcontractor and the term Owner will be deemed to
be Contractor.
16. Modifications to this Bond are as follows: [Describe modification]
INTERNAL USE ONLY
EJCDC® C-615, Payment Bond.
This document is a MODIFIED version of EJCDC® C-615.
Copyright© 2018 National Society of Professional Engineers, American Council ofEngineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 1 of 4
PAYMENT BOND
Contractor Surety
Name: [Full formal name of Contractor] Name: [Full formal name of Surety]
Address (principal place of business): Address (principal place of business):
[Address of Contractor’s principal place of
business]
[Address of Surety’s principal place of business]
Owner Contract
Name: [Full formal name of Owner] Description (name and location):
Mailing address (principal place of business): [Owner’s project/contract name, and location of
the project][Address of Owner’s principal place of business]
Contract Price: [Amount, from Contract]
Effective Date of
Contract: [Date, from Contract]
Bond
Bond Amount: [Amount]
Date of Bond: [Date]
(Date of Bond cannot be earlier than Effective Date of Contract)
Modifications to this Bond form:
☐ None ☐ See Paragraph 18
Surety and Contractor, intending to be legally bound hereby, subject to the terms set forth in this
Payment Bond, do each cause this Payment Bond to be duly executed by an authorized officer, agent, or
representative.
Contractor as Principal Surety
(Full formal name of Contractor) (Full formal name of Surety) (corporate seal)
By: By:
(Signature) (Signature)(Attach Power of Attorney)
Name: Name:
(Printed or typed) (Printed or typed)
Title: Title:
Attest: Attest:
(Signature) (Signature)
Name: Name:
(Printed or typed) (Printed or typed)
Title: Title:
Notes: (1) Provide supplemental execution by any additional parties, such as joint venturers. (2) Any singular reference to
Contractor, Surety, Owner, or other party is considered plural where applicable.
INTERNAL USE ONLY
EJCDC® C-615, Payment Bond.
This document is a MODIFIED version of EJCDC® C-615.
Copyright© 2018 NationalSociety of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 2 of 4
1. The Contractor and Surety, jointly and severally, bind themselves, their heirs, executors,
administrators, successors, and assigns to the Owner to pay for labor, materials, and equipment
furnished for use in the performance of the Construction Contract, which is incorporated herein by
reference, subject to the following terms.
2. If the Contractor promptly makes payment of all sums due to Claimants, and defends, indemnifies,
and holds harmless the Owner from claims, demands, liens, or suits by any person or entity seeking
payment for labor, materials, or equipment furnished for use in the performance of the
Construction Contract, then the Surety and the Contractor shall have no obligation under this Bond.
3. If there is no Owner Default under the Construction Contract, the Surety’s obligation to the Owner
under this Bond will arise after the Owner has promptly notified the Contractor and the Surety (at
the address described in Paragraph 13) of claims, demands, liens, or suits against the Owner or the
Owner’s property by any person or entity seeking payment for labor, materials, or equipment
furnished for use in the performance of the Construction Contract, and tendered defense of such
claims, demands, liens, or suits to the Contractor and the Surety.
4. When the Owner has satisfied the conditions in Paragraph 3, the Surety shall promptly and at the
Surety’s expense defend, indemnify, and hold harmless the Owner against a duly tendered claim,
demand, lien, or suit.
5. The Surety’s obligations to a Claimant under this Bond will arise after the following:
5.1.Claimants who do not have a direct contract with the Contractor
5.1.1. have furnished a written notice of non -payment to the Contractor, stating with
substantial accuracy the amount claimed and the name of the party to whom the
materials were, or equipment was, furnished or supplied or for whom the labor was
done or performed, within ninety (90) days after having last performed labor or last
furnished materials or equipment included in the Claim; and
5.1.2. have sent a Claim to the Surety (at the address described in Paragraph 13).
5.2.Claimants who are employed by or have a direct contract with the Contractor have sent a Claim
to the Surety (at the address described in Paragraph 13).
6. If a notice of non-payment required by Paragraph 5.1.1 is given by the Owner to the Contractor, that
is sufficient to satisfy a Claimant’s obligation to furnish a written notice of non -payment under
Paragraph 5.1.1.
7. When a Claimant has satisfied the conditions of Paragraph 5.1 or 5.2, whichever is applicable, the
Surety shall promptly and at the Surety’s expense take the following actions:
7.1.Send an answer to the Claimant, with a copy to the Owner, within sixty (60) days after receipt of
the Claim, stating the amounts that are undisputed and the basis for challenging any amounts
that are disputed; and
7.2.Pay or arrange for payment of any undisputed amounts.
INTERNAL USE ONLY
EJCDC® C-615, Payment Bond.
This document is a MODIFIED version of EJCDC® C-615.
Copyright© 2018 NationalSociety of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 3 of 4
7.3.The Surety’s failure to discharge its obligations under Paragraph7.1 or 7.2 will not be deemed to
constitute a waiver of defenses the Surety or Contractor may have or acquire as to a Claim,
except as to undisputed amounts for which the Surety and Claimant have reached agreement.
If, however, the Surety fails to discharge its obligations under Paragraph 7.1 or 7.2, the Surety
shall indemnify the Claimant for the reasonable attorney’s fees the Claimant incurs thereafter
to recover any sums found to be due and owing to the Claimant.
8. The Surety’s total obligation will not exceed the amount of this Bond, plus the amount of reasonable
attorney’s fees provided under Paragraph 7.3, and the amount of this Bond will be credited for any
payments made in good faith by the Surety.
9. Amounts owed by the Owner to the Contractor under the Construction Contract will be used for the
performance of the Construction Contract and to satisfy claims, if any, under any construction
performance bond. By the Contractor furnishing and the Owner accepting this Bond, they agree that
all funds earned by the Contractor in the performance of the Construction Contract are dedicated to
satisfying obligations of the Contractor and Surety under this Bond, subject to the Owner’s priority
to use the funds for the completion of the work.
10. The Surety shall not be liable to the Owner, Claimants, or others for obligations of the Contractor
that are unrelated to the Construction Contract. The Owner shall not be liable for the payment of
any costs or expenses of any Claimant under this Bond, and shall have under this Bond no obligation
to make payments to or give notice on behalf of Claimants, or otherwise have any obligations to
Claimants under this Bond.
11. The Surety hereby waives notice of any change, including changes of time, to the Construction
Contract or to related subcontracts, purchase orders, and other obligations.
12. No suit or action will be commenced by a Claimant under this Bond other than in a court of
competent jurisdiction in the state in which the project that is the subject of the Construction
Contract is located or after the expiration of one year from the date (1) on which the Claimant sent a
Claim to the Surety pursuant to Paragraph 5.1.2 or 5.2, or (2) on which the last labor or service was
performed by anyone or the last materials or equipment were furnished by anyone under the
Construction Contract, whichever of (1) or (2) first occurs. If the provisions of this paragraph are void
or prohibited by law, the minimum period of limitation available to sureties as a defense in the
jurisdiction of the suit will be applicable.
13. Notice and Claims to the Surety, the Owner, or the Contractor must be mailed or delivered to the
address shown on the page on which their signature appears. Actual receipt of notice or Claims,
however accomplished, will be sufficient compliance as of the date received.
14. When this Bond has been furnished to comply with a statutory or other legal requirement in the
location where the construction was to be performed, any provision in this Bond conflicting with
said statutory or legal requirement will be deemed deleted here from and provisions conforming to
such statutory or other legal requirement will be deemed incorporated herein. When so furnished,
the intent is that this Bond will be construed as a statutory bond and not as a common law bond.
15. Upon requests by any person or entity appearing to be a potential beneficiary of this Bond, the
Contractor and Owner shall promptly furnish a copy of this Bond or shall permit a copy to be made.
INTERNAL USE ONLY
EJCDC® C-615, Payment Bond.
This document is a MODIFIED version of EJCDC® C-615.
Copyright© 2018 NationalSociety of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 4 of 4
16. Definitions
16.1. Claim— A written statement by the Claimant including at a minimum:
16.1.1. The name of the Claimant;
16.1.2. The name of the person for whom the labor was done, or materials or equipment
furnished;
16.1.3. A copy of the agreement or purchase order pursuant to which labor, materials, or
equipment was furnished for use in the performance of the Construction Contract;
16.1.4. A brief description of the labor, materials, or equipment furnished;
16.1.5. The date on which the Claimant last performed labor or last furnished materials or
equipment for use in the performance of the Construction Contract;
16.1.6. The total amount earned by the Claimant for labor, materials, or equipment furnished
as of the date of the Claim;
16.1.7. The total amount of previous payments received by the Claimant; and
16.1.8. The total amount due and unpaid to the Claimant for labor, materials, or equipment
furnished as of the date of the Claim.
16.2. Claimant— An individual or entity having a direct contract with the Contractor or with a
subcontractor of the Contractor to furnish labor, materials, or equipment for use in the
performance of the Construction Contract. The term Claimant also includes any individual or
entity that has rightfully asserted a claim under an applicable mechanic’s lien or similar statute
against the real property upon which the Project is located. The intent of this Bond is to
include without limitation in the terms of “labor, materials, or equipment” that part of the
water, gas, power, light, heat, oil, gasoline, telephone service, or rental equipment used in the
Construction Contract, architectural and engineering services required for performance of the
work of the Contractor and the Contractor’s subcontractors, and all other items for which a
mechanic’s lien may be asserted in the jurisdiction where the labor, materials, or equipment
were furnished.
16.3. Construction Contract— The agreement between the Owner and Contractor identified on the
cover page, including all Contract Documents and all changes made to the agreement and the
Contract Documents.
16.4. Owner Default — Failure of the Owner, which has not been remedied or waived, to pay the
Contractor as required under the Construction Contract or to perform and complete or
comply with the other material terms of the Construction Contract.
16.5. Contract Documents — All the documents that comprise the agreement between the Owner
and Contractor.
17. If this Bond is issued for an agreement between a contractor and subcontractor, the term
Contractor in this Bond will be deemed to be Subcontractor and the term Owner will be deemed to
be Contractor.
18. Modifications to this Bond are as follows: [Describe modification]
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
This document has important legal consequences; consultation with an attorney is encouraged with
respect to its use or modification . This document should be adapted to the particular circumstances of
the contemplated Project and the controlling Laws and Regulations.
STANDARD GENERAL CONDITIONS
OF THE CONSTRUCTION CONTRACT
Prepared By
Endorsed By
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Copyright© 2018
National Society of Professional Engineers
1420 King Street, Alexandria, VA 22314-2794
(703) 684-2882
www.nspe.org
American Council of Engineering Companies
1015 15th Street N.W., Washington, DC 20005
(202) 347-7474
www.acec.org
American Society of Civil Engineers
1801 Alexander Bell Drive, Reston, VA 20191-4400
(800) 548-2723
www.asce.org
The copyright for this EJCDC document is ow ned jointly by the three sponsoring organizations listed
above. The National Society of Professional Engineers is the Copyright Administrator for the EJCDC
documents; please direct all inquiries regarding EJCDC copyrights to NSPE.
NOTE: EJCDC publications may be purchased at www.ejcdc.org, or from any of the sponsoring
organizations above.
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
TOC Page 1 of 5
STANDARD GENERAL CONDITIONS
OF THE CONSTRUCTION CONTRACT
TABLE OF CONTENTS
Page
Article 1—Definitions and Terminology ........................................................................................................ 1
1.01 Defined Terms ............................................................................................................................... 1
1.02 Terminology .................................................................................................................................. 6
Article 2—Preliminary Matters ..................................................................................................................... 7
2.01 Delivery of Performance and Payment Bonds; Evidence of Insurance......................................... 7
2.02 Copies of Documents .................................................................................................................... 7
2.03 Before Starting Construction ........................................................................................................ 7
2.04 Preconstruction Conference; Designation of Authorized Representatives .................................. 8
2.05 Acceptance of Schedules .............................................................................................................. 8
2.06 Electronic Transmittals ................................................................................................................. 8
Article 3—Contract Documents: Intent, Requirements, Reuse .................................................................... 9
3.01 Intent ............................................................................................................................................. 9
3.02 Reference Standards ..................................................................................................................... 9
3.03 Reporting and Resolving Discrepancies ...................................................................................... 10
3.04 Requirements of the Contract Documents ................................................................................. 10
3.05 Reuse of Documents ................................................................................................................... 11
Article 4—Commencement and Progress of the Work .............................................................................. 11
4.01 Commencement of Contract Times; Notice to Proceed ............................................................. 11
4.02 Starting the Work ........................................................................................................................ 11
4.03 Reference Points ......................................................................................................................... 11
4.04 Progress Schedule ....................................................................................................................... 12
4.05 Delays in Contractor’s Progress .................................................................................................. 12
Article 5—Site; Subsurface and Physical Conditions; Hazardous Environmental Conditions .................... 13
5.01 Availability of Lands .................................................................................................................... 13
5.02 Use of Site and Other Areas ........................................................................................................ 14
5.03 Subsurface and Physical Conditions ............................................................................................ 15
5.04 Differing Subsurface or Physical Conditions ............................................................................... 16
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
TOC Page 2 of 5
5.05 Underground Facilities ................................................................................................................ 17
5.06 Hazardous Environmental Conditions at Site ............................................................................. 19
Article 6—Bonds and Insurance .................................................................................................................. 21
6.01 Performance, Payment, and Other Bonds .................................................................................. 21
6.02 Insurance—General Provisions ................................................................................................... 22
6.03 Contractor’s Insurance ................................................................................................................ 24
6.04 Builder’s Risk and Other Property Insurance .............................................................................. 25
6.05 Property Losses; Subrogation ..................................................................................................... 25
6.06 Receipt and Application of Property Insurance Proceeds .......................................................... 27
Article 7—Contractor’s Responsibilities ..................................................................................................... 27
7.01 Contractor’s Means and Methods of Construction .................................................................... 27
7.02 Supervision and Superintendence .............................................................................................. 27
7.03 Labor; Working Hours ................................................................................................................. 27
7.04 Services, Materials, and Equipment ........................................................................................... 28
7.05 “Or Equals” .................................................................................................................................. 28
7.06 Substitutes .................................................................................................................................. 29
7.07 Concerning Subcontractors and Suppliers .................................................................................. 31
7.08 Patent Fees and Royalties ........................................................................................................... 32
7.09 Permits ........................................................................................................................................ 33
7.10 Taxes ........................................................................................................................................... 33
7.11 Laws and Regulations .................................................................................................................. 33
7.12 Record Documents ...................................................................................................................... 33
7.13 Safety and Protection ................................................................................................................. 34
7.14 Hazard Communication Programs .............................................................................................. 35
7.15 Emergencies ................................................................................................................................ 35
7.16 Submittals ................................................................................................................................... 35
7.17 Contractor’s General Warranty and Guarantee ......................................................................... 38
7.18 Indemnification ........................................................................................................................... 39
7.19 Delegation of Professional Design Services ................................................................................ 39
Article 8—Other Work at the Site ............................................................................................................... 40
8.01 Other Work ................................................................................................................................. 40
8.02 Coordination ............................................................................................................................... 41
8.03 Legal Relationships ...................................................................................................................... 41
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
TOC Page 3 of 5
Article 9—Owner’s Responsibilities ............................................................................................................ 42
9.01 Communications to Contractor .................................................................................................. 42
9.02 Replacement of Engineer ............................................................................................................ 42
9.03 Furnish Data ................................................................................................................................ 42
9.04 Pay When Due ............................................................................................................................. 42
9.05 Lands and Easements; Reports, Tests, and Drawings ................................................................. 43
9.06 Insurance ..................................................................................................................................... 43
9.07 Change Orders ............................................................................................................................ 43
9.08 Inspections, Tests, and Approvals ............................................................................................... 43
9.09 Limitations on Owner’s Responsibilities ..................................................................................... 43
9.10 Undisclosed Hazardous Environmental Condition ...................................................................... 43
9.11 Evidence of Financial Arrangements ........................................................................................... 43
9.12 Safety Programs .......................................................................................................................... 43
Article 10—Engineer’s Status During Construction .................................................................................... 44
10.01 Owner’s Representative .......................................................................................................... 44
10.02 Visits to Site ............................................................................................................................. 44
10.03 Resident Project Representative............................................................................................. 44
10.04 Engineer’s Authority ............................................................................................................... 44
10.05 Determinations for Unit Price Work ....................................................................................... 45
10.06 Decisions on Requirements of Contract Documents and Acceptability of Work ................... 45
10.07 Limitations on Engineer’s Authority and Responsibilities ...................................................... 45
10.08 Compliance with Safety Program ............................................................................................ 45
Article 11—Changes to the Contract .......................................................................................................... 46
11.01 Amending and Supplementing the Contract .......................................................................... 46
11.02 Change Orders ........................................................................................................................ 46
11.03 Work Change Directives .......................................................................................................... 46
11.04 Field Orders ............................................................................................................................. 47
11.05 Owner-Authorized Changes in the Work ................................................................................ 47
11.06 Unauthorized Changes in the Work ........................................................................................ 47
11.07 Change of Contract Price ........................................................................................................ 47
11.08 Change of Contract Times ....................................................................................................... 49
11.09 Change Proposals .................................................................................................................... 49
11.10 Notification to Surety .............................................................................................................. 50
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
TOC Page 4 of 5
Article 12—Claims ....................................................................................................................................... 50
12.01 Claims ...................................................................................................................................... 50
Article 13—Cost of the Work; Allowances; Unit Price Work ...................................................................... 51
13.01 Cost of the Work ..................................................................................................................... 51
13.02 Allowances .............................................................................................................................. 55
13.03 Unit Price Work ....................................................................................................................... 55
Article 14—Tests and Inspections; Correction, Removal, or Acceptance of Defective Work .................... 56
14.01 Access to Work ........................................................................................................................ 56
14.02 Tests, Inspections, and Approvals ........................................................................................... 56
14.03 Defective Work ....................................................................................................................... 57
14.04 Acceptance of Defective Work................................................................................................ 58
14.05 Uncovering Work .................................................................................................................... 58
14.06 Owner May Stop the Work ..................................................................................................... 58
14.07 Owner May Correct Defective Work ....................................................................................... 59
Article 15—Payments to Contractor; Set-Offs; Completion; Correction Period ........................................ 59
15.01 Progress Payments .................................................................................................................. 59
15.02 Contractor’s Warranty of Title ................................................................................................ 62
15.03 Substantial Completion ........................................................................................................... 62
15.04 Partial Use or Occupancy ........................................................................................................ 63
15.05 Final Inspection ....................................................................................................................... 64
15.06 Final Payment .......................................................................................................................... 64
15.07 Waiver of Claims ..................................................................................................................... 65
15.08 Correction Period .................................................................................................................... 66
Article 16—Suspension of Work and Termination ..................................................................................... 67
16.01 Owner May Suspend Work ..................................................................................................... 67
16.02 Owner May Terminate for Cause ............................................................................................ 67
16.03 Owner May Terminate for Convenience................................................................................. 68
16.04 Contractor May Stop Work or Terminate ............................................................................... 68
Article 17—Final Resolution of Disputes .................................................................................................... 69
17.01 Methods and Procedures ........................................................................................................ 69
Article 18—Miscellaneous .......................................................................................................................... 69
18.01 Giving Notice ........................................................................................................................... 69
18.02 Computation of Times............................................................................................................. 69
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
TOC Page 5 of 5
18.03 Cumulative Remedies ............................................................................................................. 70
18.04 Limitation of Damages ............................................................................................................ 70
18.05 No Waiver ............................................................................................................................... 70
18.06 Survival of Obligations ............................................................................................................ 70
18.07 Controlling Law ....................................................................................................................... 70
18.08 Assignment of Contract........................................................................................................... 70
18.09 Successors and Assigns ........................................................................................................... 70
18.10 Headings .................................................................................................................................. 70
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 1 of 70
STANDARD GENERAL CONDITIONS
OF THE CONSTRUCTION CONTRACT
ARTICLE 1—DEFINITIONS AND TERMINOLOGY
1.01 Defined Terms
A. Wherever used in the Bidding Requirements or Contract Documents, a term printed with
initial capital letters, including the term’s singular and plural forms, will have the meaning
indicated in the definitions below. In addition to terms specifically defined, terms with initial
capital letters in the Contract Documents include references to identified articles and
paragraphs, and the titles of other documents or forms.
1. Addenda—Written or graphic instruments issued prior to the opening of Bids which
clarify, correct, or change the Bidding Requirements or the proposed Contract
Documents.
2. Agreement—The written instrument, executed by Owner and Contractor, that sets forth
the Contract Price and Contract Times, identifies the parties and the Engineer, and
designates the specific items that are Contract Documents.
3. Application for Payment—The document prepared by Contractor, in a form acceptable to
Engineer, to request progress or final payments, and which is to be accompanied by such
supporting documentation as is required by the Contract Documents.
4. Bid—The offer of a Bidder submitted on the prescribed form sett ing forth the prices for
the Work to be performed.
5. Bidder—An individual or entity that submits a Bid to Owner.
6. Bidding Documents—The Bidding Requirements, the proposed Contract Documents, and
all Addenda.
7. Bidding Requirements—The Advertisement or invitation to bid, Instructions to Bidders,
Bid Bond or other Bid security, if any, the Bid Form, and the Bid with any attachments.
8. Change Order—A document which is signed by Contractor and Owner and authorizes an
addition, deletion, or revision in the Work or an adjustment in the Contract Price or the
Contract Times, or other revision to the Contract, issued on or after the Effective Date of
the Contract.
9. Change Proposal—A written request by Contractor, duly submitted in compliance w ith
the procedural requirements set forth herein, seeking an adjustment in Contract Price or
Contract Times; contesting an initial decision by Engineer concerning the requirements of
the Contract Documents or the acceptability of Work under the Contract Do cuments;
challenging a set -off against payments due; or seeking other relief with respect to the
terms of the Contract.
10. Claim
a. A demand or assertion by Owner directly to Contractor, duly submitted in compliance
with the procedural requirements set forth herein, seeking an adjustment of Contract
Price or Contract Times; contesting an initial decision by Engineer concerning the
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 2 of 70
requirements of the Contract Documents or the acceptability of Work under the
Contract Documents; contesting Engineer’s decisio n regarding a Change Proposal;
seeking resolution of a contractual issue that Engineer has declined to address; or
seeking other relief with respect to the terms of the Contract.
b. A demand or assertion by Contractor directly to Owner, duly submitted in compliance
with the procedural requirements set forth herein, contesting Engineer’s decision
regarding a Change Proposal, or seeking resolution of a contractual issue that
Engineer has declined to address.
c. A demand or assertion by Owner or Contractor, du ly submitted in compliance with
the procedural requirements set forth herein, made pursuant to Paragraph 12.01.A.4,
concerning disputes arising after Engineer has issued a recommendation of final
payment.
d. A demand for money or services by a third party is not a Claim.
11. Constituent of Concern —Asbestos, petroleum, radioactive materials, polychlorinated
biphenyls (PCBs), lead -based paint (as defined by the HUD/EPA standard), hazardous
waste, and any substance, product, waste, or other material of any nat ure whatsoever
that is or becomes listed, regulated, or addressed pursuant to Laws and Regulations
regulating, relating to, or imposing liability or standards of conduct concerning, any
hazardous, toxic, or dangerous waste, substance, or material.
12. Contract—The entire and integrated written contract between Owner and Contractor
concerning the Work.
13. Contract Documents—Those items so designated in the Agreement, and which together
comprise the Contract.
14. Contract Price—The money that Owner has agree d to pay Contractor for completion of
the Work in accordance with the Contract Documents.
15. Contract Times—The number of days or the dates by which Contractor shall: (a) achieve
Milestones, if any; (b) achieve Substantial Completion; and (c) complete the Work.
16. Contractor—The individual or entity with which Owner has contracted for performance
of the Work.
17. Cost of the Work—See Paragraph 13.01 for definition.
18. Drawings—The part of the Contract that graphically shows the scope, extent, and
character of the Work to be performed by Contractor.
19. Effective Date of the Contract —The date, indicated in the Agreement, on which the
Contract becomes effective.
20. Electronic Document —Any Project -related correspondence, attachments to
correspondence, data, documents, drawings, information, or graphics, including but not
limited to Shop Drawings and other Submittals, that are in an electronic or digital format.
21. Electronic Means —Electronic mail (email), upload/download from a secure Project
website, or other communications methods that allow: (a) the transmission or
communication of Electronic Documents; (b) the documentation of transmissions,
including sending and receipt; (c) printing of the transmitted Electronic Document by the
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 3 of 70
recipient; (d) the storage and archiving of the Electronic Document by sender and
recipient; and (e) the use by recipient of the Electronic Document for purposes permitted
by this Contract. Electronic Means does not include the use of text messaging, or of
Facebook, Twitter, Instagram, or similar social media services for transmission of
Electronic Documents.
22. Engineer—The individual or entity named as such in the Agreement.
23. Field Order —A written order issued by Engineer which requires minor changes in the
Work but does not change the Contract Price or the Contract Times.
24. Hazardous Environmental Condition—The presence at the Site of Constituents of Concern
in such quantities or circumstances that may present a danger to persons or property
exposed thereto.
a. The presence at the Site of materials that are necessary for the execution of the Work,
or that are to be incorporated into the Work, and that are controlled and contained
pursuant to industry practices, Laws and Regulations, and the requirements of the
Contract, is not a Hazardous Environmental Condition.
b. The presence of Constituents of Concern that are to be removed or remediated as
part of the Work is not a Hazardous Environmental Condition.
c. The presence of Constituents of Concern as part of the routine, anticipated, and
obvious working conditions at the Site, is not a Hazardous Environmental Condition.
25. Laws and Regulations; Laws or Regulations—Any and all applicable laws, statutes, rules,
regulations, ordinances, codes, and binding decrees, resolutions, and orders of any and
all governmental bodies, agencies, authorities, and courts having jurisdiction.
26. Liens—Charges, security interests, or encumbrances upon Contract -related funds, real
property, or personal property.
27. Milestone—A principal event in the performance of the Work that the Contract requires
Contractor to achieve by an intermediate completion date, or by a time prior to
Substantial Completion of all the Work.
28. Notice of Award—The written notice by Owner to a Bidder of Owner’s acceptance of the
Bid.
29. Notice to Proceed—A written notice by Owner to Contractor fixing the date on which the
Contract Times will commence to run and on which Contractor shall start to perform the
Work.
30. Owner—The individual or entity with whic h Contractor has contracted regarding the
Work, and which has agreed to pay Contractor for the performance of the Work, pursuant
to the terms of the Contract.
31. Progress Schedule—A schedule, prepared and maintained by Contractor, describing the
sequence and duration of the activities comprising Contractor’s plan to accomplish the
Work within the Contract Times.
32. Project—The total undertaking to be accomplished for Owner by engineers, contractors,
and others, including planning, study, design, construct ion, testing, commissioning, and
start-up, and of which the Work to be performed under the Contract Documents is a part.
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 4 of 70
33. Resident Project Representative—The authorized representative of Engineer assigned to
assist Engineer at the Site. As used herein, the term Resident Project Representative (RPR)
includes any assistants or field staff of Resident Project Representative.
34. Samples—Physical examples of materials, equipment, or workmanship that are
representative of some portion of the Work and that est ablish the standards by which
such portion of the Work will be judged.
35. Schedule of Submittals—A schedule, prepared and maintained by Contractor, of required
submittals and the time requirements for Engineer’s review of the submittals.
36. Schedule of V alues—A schedule, prepared and maintained by Contractor, allocating
portions of the Contract Price to various portions of the Work and used as the basis for
reviewing Contractor’s Applications for Payment.
37. Shop Drawings —All drawings, diagrams, illustra tions, schedules, and other data or
information that are specifically prepared or assembled by or for Contractor and
submitted by Contractor to illustrate some portion of the Work. Shop Drawings, whether
approved or not, are not Drawings and are not Contract Documents.
38. Site—Lands or areas indicated in the Contract Documents as being furnished by Owner
upon which the Work is to be performed, including rights -of-way and easements, and
such other lands or areas furnished by Owner which are designated for t he use of
Contractor.
39. Specifications—The part of the Contract that consists of written requirements for
materials, equipment, systems, standards, and workmanship as applied to the Work, and
certain administrative requirements and procedural matters applicable to the Work.
40. Subcontractor—An individual or entity having a direct contract with Contractor or with
any other Subcontractor for the performance of a part of the Work.
41. Submittal—A written or graphic document, prepared by or for Contractor, w hich the
Contract Documents require Contractor to submit to Engineer, or that is indicated as a
Submittal in the Schedule of Submittals accepted by Engineer. Submittals may include
Shop Drawings and Samples; schedules; product data; Owner -delegated designs ;
sustainable design information; information on special procedures; testing plans; results
of tests and evaluations, source quality -control testing and inspections, and field or Site
quality-control testing and inspections; warranties and certifications; Suppliers’
instructions and reports; records of delivery of spare parts and tools; operations and
maintenance data; Project photographic documentation; record documents; and other
such documents required by the Contract Documents. Submittals, whether or no t
approved or accepted by Engineer, are not Contract Documents. Change Proposals,
Change Orders, Claims, notices, Applications for Payment, and requests for interpretation
or clarification are not Submittals.
42. Substantial Completion—The time at which th e Work (or a specified part thereof) has
progressed to the point where, in the opinion of Engineer, the Work (or a specified part
thereof) is sufficiently complete, in accordance with the Contract Documents, so that the
Work (or a specified part thereof) can be utilized for the purposes for which it is intended.
The terms “substantially complete” and “substantially completed” as applied to all or part
of the Work refer to Substantial Completion of such Work.
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 5 of 70
43. Successful Bidder—The Bidder to which the Owner makes an award of contract.
44. Supplementary Conditions—The part of the Contract that amends or supplements these
General Conditions.
45. Supplier—A manufacturer, fabricator, supplier, distributor, or vendor having a direct
contract with Contractor or with any Subcontractor to furnish materials or equipment to
be incorporated in the Work by Contractor or a Subcontractor.
46. Technical Data
a. Those items expressly identified as Technical Data in the Supplementary Conditions,
with respect to either (1) existing subsurface conditions at or adjacent to the Site, or
existing physical conditions at or adjacent to the Site including existing surface or
subsurface structures (except Underground Facilities) or (2) Hazardous
Environmental Conditions at the Site.
b. If no such express identifications of Technical Data have been made with respect to
conditions at the Site, then Technical Data is defined, with respect to conditions at
the Site under Paragraphs 5.03, 5.04, and 5.06, as the data contained in boring logs,
recorded measurements of subsurface water levels, assessments of the condition of
subsurface facilities, laboratory test results, and other factual, objective information
regarding conditions at the Site that are set forth in any geotechnical, environmental,
or other Site or facilities conditions report prepared for the Project and made
available to Contractor.
c. Information and data regarding the presence or location of Underground Facilities
are not intended to be categorized, i dentified, or defined as Technical Data, and
instead Underground Facilities are shown or indicated on the Drawings.
47. Underground Facilities —All active or not -in-service underground lines, pipelines,
conduits, ducts, encasements, cables, wires, manholes, vaults, tanks, tunnels, or other
such facilities or systems at the Site, including but not limited to those facilities or systems
that produce, transmit, distribute, or convey telephone or other communications, cable
television, fiber optic transmissions, power, electricity, light, heat, gases, oil, crude oil
products, liquid petroleum products, water, steam, waste, wastewater, storm water,
other liquids or chemicals, or traffic or other control systems. An abandoned facility or
system is not an Underground Facility.
48. Unit Price Work—Work to be paid for on the basis of unit prices.
49. Work—The entire construction or the various separately identifiable parts thereof
required to be provided under the Contract Documents. Work includes and is the result
of performing or providing all labor, services, and documentation necessary to produce
such construction; furnishing, installing, and incorporating all materials and equipment
into such construction; and may include related services such as testing, start -up, and
commissioning, all as required by the Contract Documents.
50. Work Change Directive—A written directive to Contractor issued on or after the Effective
Date of the Contract, signed by Owner and recommended by Engineer, ordering an
addition, deletion, or revision in the Work.
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 6 of 70
1.02 Terminology
A. The words and terms discussed in Paragraphs 1.02.B, C, D, and E are not defined terms that
require initial capital letters, but, when used in the Bidding Requirements or Contract
Documents, have the indicated meaning.
B. Intent of Certain Terms or Adjectives: The Contract Documents include the terms “as allowed,”
“as approved,” “as ordered,” “as directed” or terms of like effect or import to authorize an
exercise of professional judgment by Engineer. In addition, the adjectives “reasonable,”
“suitable,” “acceptable,” “proper,” “satisfactory,” or adjectives of like effect or import are
used to describe an action or determination of Engineer as to the Work. It is intended that
such exercise of professional judgment, action, or determination will be solely to evaluate, in
general, the Work for compliance with the information in the Contract Documents and with
the design concept of the Project as a functioning whole as shown or indicated in the Contract
Documents (unless there is a specific statement indicating otherwise). The use of any such
term or adjective is not intended to and shall not be effective to assign to Engineer any duty
or authority to supervise or direct the performance of the Work, or any duty or author ity to
undertake responsibility contrary to the provisions of Article 10 or any other provision of the
Contract Documents.
C. Day: The word “day” means a calendar day of 24 hours measured from midnight to the next
midnight.
D. Defective: The word “defectiv e,” when modifying the word “Work,” refers to Work that is
unsatisfactory, faulty, or deficient in that it:
1. does not conform to the Contract Documents;
2. does not meet the requirements of any applicable inspection, reference standard, test,
or approval referred to in the Contract Documents; or
3. has been damaged prior to Engineer’s recommendation of final payment (unless
responsibility for the protection thereof has been assumed by Owner at Substantial
Completion in accordance with Paragraph 15.03 or Paragraph 15.04).
E. Furnish, Install, Perform, Provide
1. The word “furnish,” when used in connection with services, materials, or equipment,
means to supply and deliver said services, materials, or equipment to the Site (or some
other specified location) ready for use or installation and in usable or operable condition.
2. The word “install,” when used in connection with services, materials, or equipment,
means to put into use or place in final position said services, materials, or equipment
complete and ready for intended use.
3. The words “perform” or “provide,” when used in connection with services, materials, or
equipment, means to furnish and install said services, materials, or equipment complete
and ready for intended use.
4. If the Contract Document s establish an obligation of Contractor with respect to specific
services, materials, or equipment, but do not expressly use any of the four words
“furnish,” “install,” “perform,” or “provide,” then Contractor shall furnish and install said
services, materials, or equipment complete and ready for intended use.
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 7 of 70
F. Contract Price or Contract Times: References to a change in “Contract Price or Contract Times”
or “Contract Times or Contract Price” or similar, indicate that such change applies to
(1) Contract Pr ice, (2) Contract Times, or (3) both Contract Price and Contract Times, as
warranted, even if the term “or both” is not expressed.
G. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known
technical or construction indus try or trade meaning are used in the Contract Documents in
accordance with such recognized meaning.
ARTICLE 2—PRELIMINARY MATTERS
2.01 Delivery of Performance and Payment Bonds; Evidence of Insurance
A. Performance and Payment Bonds : When Contractor delivers the signed counterparts of the
Agreement to Owner, Contractor shall also deliver to Owner the performance bond and
payment bond (if the Contract requires Contractor to furnish such bonds).
B. Evidence of Contractor’s Insurance: When Contractor delivers the signed counterparts of the
Agreement to Owner, Contractor shall also deliver to Owner, with copies to each additional
insured (as identified in the Contract), the certificates, endorsements, and other evidence of
insurance required to be provided by Contractor in accordance with Article 6, except to the
extent the Supplementary Conditions expressly establish other dates for delivery of specific
insurance policies.
C. Evidence of Owner’s Insurance: After receipt of the signed counterparts of the Agreement and
all required bonds and insurance documentation, Owner shall promptly deliver to Contractor,
with copies to each additional insured (as identified in the Contract), the certificates and other
evidence of insurance required to be provided by Owner under Article 6.
2.02 Copies of Documents
A. Owner shall furnish to Contractor four printed copies of the Contract (including one fully
signed counterpart of the Agreement), and one copy in electronic portable document format
(PDF). Additional printed copies will be furnished upon request at the cost of reproduction.
B. Owner shall maintain and safeguard at least one original printed record version of the
Contract, including Drawings and Specifications signed and sealed by Engineer and other
design professionals. Owner shall make such original printed record version of the Contract
available to Contractor for review. Owner may delegate the responsibilities under this
provision to Engineer.
2.03 Before Starting Construction
A. Preliminary Schedules: Within 10 days after the Effective Date of the Contract (or as otherwise
required by the Contract Documents), Contractor shall submit to Engineer for timely review:
1. a preliminary Progress Schedule indicating the times (numbers of days or dates) for
starting and completing the various stages of the Work, including any Milestones
specified in the Contract;
2. a preliminary Schedule of Submittals; and
3. a preliminary Schedule of Values for all of the Work which includes quantities and prices
of items which when added together equal the Contract Price and subdivides the Work
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 8 of 70
into component parts in sufficient detail to serve as the basis for progress payments
during performance of the Work. Such prices will include an appropriate amount of
overhead and profit applicable to each item of Work.
2.04 Preconstruction Conference; Designation of Authorized Representatives
A. Before any Work at the Site is started, a conference attended by Owner, Contractor, Engineer,
and others as appropriate will be held to establish a working understanding among the parties
as to the Work, and to discuss the schedules referred to in Paragraph 2.03.A, procedures for
handling Shop Drawings, Samples, and other Submittals, processing Applications for Payment,
electronic or digital transmittals, and maintaining required records.
B. At this conference Owner and Contractor each shall designate, in writing, a specific individual
to act as its authorized representative with respect to the services and responsibilities under
the Contract. Such individuals shall have the authority to transmit and receive information,
render decisions relative to the Contract, and otherwise act on behalf of each respective
party.
2.05 Acceptance of Schedules
A. At least 10 days before submission of the first Application for Payment a conference, attended
by Contractor, Engineer, and others as appropriate, will be held to review the schedules
submitted in accordance with Paragraph 2.03.A. No progress payment will be made to
Contractor until acceptable schedules are submitted to Engineer.
1. The Progress Schedule will be acceptable to Engineer if it provides an orderly progression
of the Work to completion within the Contract Times. Such acceptance will not impose
on Engineer responsibility for the Progress Sche dule, for sequencing, scheduling, or
progress of the Work, nor interfere with or relieve Contractor from Contractor’s full
responsibility therefor.
2. Contractor’s Schedule of Submittals will be acceptable to Engineer if it provides a
workable arrangement for reviewing and processing the required submittals.
3. Contractor’s Schedule of Values will be acceptable to Engineer as to form and substance
if it provides a reasonable allocation of the Contract Price to the component parts of the
Work.
4. If a schedule is not acceptable, Contractor will have an additional 10 days to revise and
resubmit the schedule.
2.06 Electronic Transmittals
A. Except as otherwise stated elsewhere in the Contract, the Owner, Engineer, and Contractor
may send, and shall accept, Electronic Documents transmitted by Electronic Means.
B. If the Contract does not establish protocols for Electronic Means, then Owner, Engineer, and
Contractor shall jointly develop such protocols.
C. Subject to any governing protocols for Electronic Means, w hen transmitting Electronic
Documents by Electronic Means, the transmitting party makes no representations as to long-
term compatibility, usability, or readability of the Electronic Documents resulting from the
recipient’s use of software application packa ges, operating systems, or computer hardware
differing from those used in the drafting or transmittal of the Electronic Documents.
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 9 of 70
ARTICLE 3—CONTRACT DOCUMENTS: INTENT, REQUIREMENTS, REUSE
3.01 Intent
A. The Contract Documents are complementary; what is required by one Contract Document is
as binding as if required by all.
B. It is the intent of the Contract Documents to describe a functionally complete Project (or part
thereof) to be constructed in accordance with the Contract Documents.
C. Unless otherwise stated in the Contract Documents, if there is a discrepancy between the
electronic versions of the Contract Documents (including any printed copies derived from
such electronic versions) and the printed record version, the printe d record version will
govern.
D. The Contract supersedes prior negotiations, representations, and agreements, whether
written or oral.
E. Engineer will issue clarifications and interpretations of the Contract Documents as provided
herein.
F. Any provision or part of the Contract Documents held to be void or unenforceable under any
Law or Regulation will be deemed stricken, and all remaining provisions will continue to be
valid and binding upon Owner and Contractor, which agree that the Contract Documents will
be reformed to replace such stricken provision or part thereof with a valid and enforceable
provision that comes as close as possible to expressing the intention of the stricken provision.
G. Nothing in the Contract Documents creates:
1. any contractual relationship between Owner or Engineer and any Subcontractor,
Supplier, or other individual or entity performing or furnishing any of the Work, for the
benefit of such Subcontractor, Supplier, or other individual or entity; or
2. any obligation on the par t of Owner or Engineer to pay or to see to the payment of any
money due any such Subcontractor, Supplier, or other individual or entity, except as may
otherwise be required by Laws and Regulations.
3.02 Reference Standards
A. Standards Specifications, Codes, Laws and Regulations
1. Reference in the Contract Documents to standard specifications, manuals, reference
standards, or codes of any technical society, organization, or association, or to Laws or
Regulations, whether such reference be specific or by implication, means the standard
specification, manual, reference standard, code, or Laws or Regulations in effect at the
time of opening of Bids (or on the Effective Date of the Contract if there were no Bids),
except as may be otherwise specifically stated in the Contract Documents.
2. No provision of any such standard specification, manual, reference standard, or code, and
no instruction of a Supplier, will be effective to change the duties or responsibilities of
Owner, Contractor, or Engineer from those set forth in the part of the Contract
Documents prepared by or for Engineer. No such provision or instruction shall be effective
to assign to Owner or Engineer any duty or authority to supervise or direct the
performance of the Work, or any duty or authori ty to undertake responsibility
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 10 of 70
inconsistent with the provisions of the part of the Contract Documents prepared by or for
Engineer.
3.03 Reporting and Resolving Discrepancies
A. Reporting Discrepancies
1. Contractor’s Verification of Figures and Field Measu rements: Before undertaking each
part of the Work, Contractor shall carefully study the Contract Documents, and check and
verify pertinent figures and dimensions therein, particularly with respect to applicable
field measurements. Contractor shall promptly report in writing to Engineer any conflict,
error, ambiguity, or discrepancy that Contractor discovers, or has actual knowledge of,
and shall not proceed with any Work affected thereby until the conflict, error, ambiguity,
or discrepancy is resolved by a clarification or interpretation by Engineer, or by an
amendment or supplement to the Contract issued pursuant to Paragraph 11.01.
2. Contractor’s Review of Contract Documents: If, before or during the performance of the
Work, Contractor discovers any confl ict, error, ambiguity, or discrepancy within the
Contract Documents, or between the Contract Documents and (a) any applicable Law or
Regulation, (b) actual field conditions, (c) any standard specification, manual, reference
standard, or code, or (d) any in struction of any Supplier, then Contractor shall promptly
report it to Engineer in writing. Contractor shall not proceed with the Work affected
thereby (except in an emergency as required by Paragraph 7.15) until the conflict, error,
ambiguity, or discrepancy is resolved, by a clarification or interpretation by Engineer, or
by an amendment or supplement to the Contract issued pursuant to Paragraph 11.01.
3. Contractor shall not be liable to Owner or Engineer for failure to report any conflict, error,
ambiguity, or discrepancy in the Contract Documents unless Contractor had actual
knowledge thereof.
B. Resolving Discrepancies
1. Except as may be otherwise specifically stated in the Contract Documents, the provisions
of the part of the Contract Documents prepa red by or for Engineer take precedence in
resolving any conflict, error, ambiguity, or discrepancy between such provisions of the
Contract Documents and:
a. the provisions of any standard specification, manual, reference standard, or code, or
the instruction of any Supplier (whether or not specifically incorporated by reference
as a Contract Document); or
b. the provisions of any Laws or Regulations applicable to the performance of the Work
(unless such an interpretation of the provisions of the Contract Do cuments would
result in violation of such Law or Regulation).
3.04 Requirements of the Contract Documents
A. During the performance of the Work and until final payment, Contractor and Owner shall
submit to the Engineer in writing all matters in question concerning the requirements of the
Contract Documents (sometimes referred to as requests for information or interpretation —
RFIs), or relating to the acceptability of the Work under the Contract Documents, as soon as
possible after such matters arise. Engineer will be the initial interpreter of the requirements
of the Contract Documents, and judge of the acceptability of the Work.
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 11 of 70
B. Engineer will, with reasonable promptness, render a written clarification, interpretation, or
decision on the issue submitted, or initiate an amendment or supplement to the Contract
Documents. Engineer’s written clarification, interpretation, or decision will be final and
binding on Contractor, unless it appeals by submitting a Change Proposal, and on Owner,
unless it appeals by filing a Claim.
C. If a submitted matter in question concerns terms and conditions of the Contract Documents
that do not involve (1) the performance or acceptability of the Work under the Contract
Documents, (2) the design (as set forth in the Dr awings, Specifications, or otherwise), or (3)
other engineering or technical matters, then Engineer will promptly notify Owner and
Contractor in writing that Engineer is unable to provide a decision or interpretation. If Owner
and Contractor are unable to agree on resolution of such a matter in question, either party
may pursue resolution as provided in Article 12.
3.05 Reuse of Documents
A. Contractor and its Subcontractors and Suppliers shall not:
1. have or acquire any title to or ownership rights in any of the Drawings, Specifications, or
other documents (or copies of any thereof) prepared by or bearing the seal of Engineer
or its consultants, including electronic media versions, or reuse any such Drawings,
Specifications, other documents, or copies ther eof on extensions of the Project or any
other project without written consent of Owner and Engineer and specific written
verification or adaptation by Engineer; or
2. have or acquire any title or ownership rights in any other Contract Documents, reuse any
such Contract Documents for any purpose without Owner’s express written consent, or
violate any copyrights pertaining to such Contract Documents.
B. The prohibitions of this Paragraph 3.05 will survive final payment, or termination of the
Contract. Nothing herein precludes Contractor from retaining copies of the Contract
Documents for record purposes.
ARTICLE 4—COMMENCEMENT AND PROGRESS OF THE WORK
4.01 Commencement of Contract Times; Notice to Proceed
A. The Contract Times will commence to run on the 30th day after the Effective Date of the
Contract or, if a Notice to Proceed is given, on the day indicated in the Notice to Proceed. A
Notice to Proceed may be given at any time within 30 days after the Effective Date of the
Contract. In no event will the Contract Times commence to run later than the 60th day after
the day of Bid opening or the 30th day after the Effective Date of the Contract, whichever
date is earlier.
4.02 Starting the Work
A. Contractor shall start to perform the Work on the date when the C ontract Times commence
to run. No Work may be done at the Site prior to such date.
4.03 Reference Points
A. Owner shall provide engineering surveys to establish reference points for construction which
in Engineer’s judgment are necessary to enable Contract or to proceed with the Work.
Contractor shall be responsible for laying out the Work, shall protect and preserve the
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 12 of 70
established reference points and property monuments, and shall make no changes or
relocations without the prior written approval of Owner. Contractor shall report to Engineer
whenever any reference point or property monument is lost or destroyed or requires
relocation because of necessary changes in grades or locations, and shall be responsible for
the accurate replacement or relocation of su ch reference points or property monuments by
professionally qualified personnel.
4.04 Progress Schedule
A. Contractor shall adhere to the Progress Schedule established in accordance with
Paragraph 2.05 as it may be adjusted from time to time as provided below.
1. Contractor shall submit to Engineer for acceptance (to the extent indicated in
Paragraph 2.05) proposed adjustments in the Progress Schedule that will not result in
changing the Contract Times.
2. Proposed adjustments in the Progress Schedule that will change the Contract Times must
be submitted in accordance with the requirements of Article 11.
B. Contractor shall carry on the Work and adhere to the Progress Schedule during all disputes or
disagreements with Owner. No Work will be delayed or postponed pending resolution of any
disputes or disagreements, or during any appeal process, except as permitted by
Paragraph 16.04, or as Owner and Contractor may otherwise agree in writing.
4.05 Delays in Contractor’s Progress
A. If Owner, Engineer, or anyone for whom Owner is responsible, delays, disrupts, or interferes
with the performance or progress of the Work, then Contractor shall be entitled to an
equitable adjustment in Contract Price or Contract Times.
B. Contractor shall not be entitled to an adjustment in Contract Price or Contract Times for delay,
disruption, or interference caused by or within the control of Contractor. Delay, disruption,
and interference attributable to and within the control of a Subcontractor or Supplier shall be
deemed to be within the control of Contractor.
C. If Contractor’s performance or progress is delayed, disrupted, or interfered with by
unanticipated causes not the fault of and beyond the control of Owner, Contractor, and those
for which they are responsible, then Contractor shall be entitled to an equitable adjustment
in Contract Times. Such an adjustment will be Contractor’s sole and exclusive remedy for the
delays, disruption, and interference described in this paragraph. Causes of delay, disruption,
or interference that may give rise to an adjustment in Contract Times under this paragraph
include but are not limited to the following:
1. Severe and unavoidable natural catastrophes such as fires, floods, epidemics, and
earthquakes;
2. Abnormal weather conditions;
3. Acts or failures to act of third-party utility owners or other third-party entities (other than
those third-party utility owners or other third-party entities performing other work at or
adjacent to the Site as arranged by or under contract with Owner, as cont emplated in
Article 8); and
4. Acts of war or terrorism.
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 13 of 70
D. Contractor’s entitlement to an adjustment of Contract Times or Contract Price is limited as
follows:
1. Contractor’s entitlement to an adjustment of the Contract Times is conditioned on the
delay, disruption, or interference adversely affecting an activity on the critical path to
completion of the Work, as of the time of the delay, disruption, or interference.
2. Contractor shall not be entitled to an adjustment in Contract Price for any dela y,
disruption, or interference if such delay is concurrent with a delay, disruption, or
interference caused by or within the control of Contractor. Such a concurrent delay by
Contractor shall not preclude an adjustment of Contract Times to which Contractor is
otherwise entitled.
3. Adjustments of Contract Times or Contract Price are subject to the provisions of
Article 11.
E. Each Contractor request or Change Proposal seeking an increase in Contract Times or Contract
Price must be supplemented by supporting data that sets forth in detail the following:
1. The circumstances that form the basis for the requested adjustment;
2. The date upon which each cause of delay, disruption, or interference began to affect the
progress of the Work;
3. The date upon which each cause of delay, disruption, or interference ceased to affect the
progress of the Work;
4. The number of days’ increase in Contract Times claimed as a consequence of each such
cause of delay, disruption, or interference; and
5. The impact on Contract Price, in accordance with the provisions of Paragraph 11.07.
Contractor shall also furnish such additional supporting documentation as Owner or Engineer
may require including, where appropriate, a revised progress schedule indicating all the
activities affected by the delay, disruption, or interference, and an explanation of the effect
of the delay, disruption, or interference on the critical path to completion of the Work.
F. Delays, disruption, and interference to the performance or progress of the Work res ulting
from the existence of a differing subsurface or physical condition, an Underground Facility
that was not shown or indicated by the Contract Documents, or not shown or indicated with
reasonable accuracy, and those resulting from Hazardous Environment al Conditions, are
governed by Article 5, together with the provisions of Paragraphs 4.05.D and 4.05.E.
G. Paragraph 8.03 addresses delays, disruption, and interference to the performance or progress
of the Work resulting from the performance of certain other work at or adjacent to the Site.
ARTICLE 5 —SITE; SUBS URFACE AND PHYSICAL CONDITIONS; HAZARDOU S ENVIRONMENTAL
CONDITIONS
5.01 Availability of Lands
A. Owner shall furnish the Site. Owner shall notify Contractor in writing of any encumbrances or
restrictions not of general application but specifically related to use of the Site with which
Contractor must comply in performing the Work.
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 14 of 70
B. Upon reasonable written request, Owner shall furnish Contractor with a current statement of
record legal title and legal description of the lands upon which permanent improvements are
to be made and Owner’s interest therein as necessary for giving notice of or filing a mechanic’s
or construction lien against such lands in accordance with applicable Laws and Regulations.
C. Contractor shall provide for all additional lands and access thereto that may be required for
temporary construction facilities or storage of materials and equipment.
5.02 Use of Site and Other Areas
A. Limitation on Use of Site and Other Areas
1. Contractor shall confine construction equipment, temporary construction facilities, the
storage of materials and equipment, and the operations of workers to the Site, adjacent
areas that Contractor has arranged to use through construction easements or otherwise,
and other adjacent areas permitted by Laws and Regulations, and shall not unreasonably
encumber the Site and such other adjacent areas with construction equipment or other
materials or equipment. Contractor shall assume full responsibility for (a) damage to the
Site; (b) damage to any such other adjacent areas used for Contractor’s operations; (c)
damage to any other adjacent land or areas, or to improvements, structures, utilities, or
similar facilities located at such adjacent lands or areas; and (d) for injuries and losses
sustained by the owners or occupants of any such land or areas; provided that such
damage or injuries result from the performance of the Work or from other actions or
conduct of the Contractor or those for which Contractor is responsible.
2. If a damage or injury claim is made by the owner or occupant of any such land or area
because of the performance of the Work, or because of other actions or conduct of the
Contractor or those for which Contractor is responsible, Contractor shall (a) take
immediate corrective or remedial action as required by Paragraph 7.13, or otherwise; (b)
promptly attempt to settle the claim as to all parties through negotiations with such
owner or occupant, or otherwise resolve the claim by arbitration or other di spute
resolution proceeding, or in a court of competent jurisdiction; and (c) to the fullest extent
permitted by Laws and Regulations, indemnify and hold harmless Owner and Engineer,
and the officers, directors, members, partners, employees, agents, consul tants and
subcontractors of each and any of them, from and against any such claim, and against all
costs, losses, and damages (including but not limited to all fees and charges of engineers,
architects, attorneys, and other professionals and all court or arbitration or other dispute
resolution costs) arising out of or relating to any claim or action, legal or equitable,
brought by any such owner or occupant against Owner, Engineer, or any other party
indemnified hereunder to the extent caused directly or indirectly, in whole or in part by,
or based upon, Contractor’s performance of the Work, or because of other actions or
conduct of the Contractor or those for which Contractor is responsible.
B. Removal of Debris During Performance of the Work : During the pr ogress of the Work the
Contractor shall keep the Site and other adjacent areas free from accumulations of waste
materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish,
and other debris will conform to applicable Laws and Regulations.
C. Cleaning: Prior to Substantial Completion of the Work Contractor shall clean the Site and the
Work and make it ready for utilization by Owner. At the completion of the Work Contractor
shall remove from the Site and adjacent areas all tools, appliances, construction equipment
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 15 of 70
and machinery, and surplus materials and shall restore to original condition all property not
designated for alteration by the Contract Documents.
D. Loading of Structures : Contractor shall not load nor permit any part of any structure to be
loaded in any manner that will endanger the structure, nor shall Contractor subject any part
of the Work or adjacent structures or land to stresses or pressures that will endanger them.
5.03 Subsurface and Physical Conditions
A. Reports and Drawings: The Supplementary Conditions identify:
1. Those reports of explorations and tests of subsurface conditions at or adjacent to the Site
that contain Technical Data;
2. Those drawings of existing physical conditions at or adjacent to th e Site, including those
drawings depicting existing surface or subsurface structures at or adjacent to the Site
(except Underground Facilities), that contain Technical Data; and
3. Technical Data contained in such reports and drawings.
B. Underground Facil ities: Underground Facilities are shown or indicated on the Drawings,
pursuant to Paragraph 5.05, and not in the drawings referred to in Paragraph 5.03.A.
Information and data regarding the presence or location of Underground Facilities are not
intended to be categorized, identified, or defined as Technical Data.
C. Reliance by Contractor on Technical Data : Contractor may rely upon the accuracy of the
Technical Data expressly identified in the Supplementary Conditions with respect to such
reports and drawings, but such reports and drawings are not Contract Documents. If no such
express identification has been made, then Contractor may rely upon the accuracy of the
Technical Data as defined in Paragraph 1.01.A.46.b.
D. Limitations of Other Data and Documents : Except for such reliance on Technical Data,
Contractor may not rely upon or make any claim against Owner or Engineer, or any of their
officers, directors, members, partners, employees, agents, consultants, or subcontractors,
with respect to:
1. the completeness of such reports and drawings for Contractor’s purposes, including, but
not limited to, any aspects of the means, methods, techniques, sequences, and
procedures of construction to be employed by Contractor, and safety precautions and
programs incident thereto;
2. other data, interpretations, opinions, and information contained in such reports or shown
or indicated in such drawings;
3. the contents of other Site -related documents made available to Contractor, such as
record drawings from other projects at or adjacent to the Site, or Owner’s archival
documents concerning the Site; or
4. any Contractor interpretation of or conclusion drawn from any Technical Data or any such
other data, interpretations, opinions, or information.
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 16 of 70
5.04 Differing Subsurface or Physical Conditions
A. Notice by Contractor: If Contractor believes that any subsurface or physical condition that is
uncovered or revealed at the Site:
1. is of such a nature as to establish that any Technical Data on which Contractor is entitled
to rely as provided in Paragraph 5.03 is materially inaccurate;
2. is of such a nature as to require a change in the Drawings or Specifications;
3. differs materially from that shown or indicated in the Contract Documents; or
4. is of an unusual nature, and differs materially from conditions ordinarily encountered and
generally recognized as inherent in work of the character provided for in the Contract
Documents;
then Contractor shall, promptly after becoming aware thereof and before further disturbing
the subsurface or physical conditions or performing any Work in connection therewith (except
in an emergency as required by Paragraph 7.15), notify Owner and Engineer in writing about
such condition. Contractor shall not further disturb such condition or perfor m any Work in
connection therewith (except with respect to an emergency) until receipt of a written
statement permitting Contractor to do so.
B. Engineer’s Review: After receipt of written notice as required by the preceding paragraph,
Engineer will prompt ly review the subsurface or physical condition in question; determine
whether it is necessary for Owner to obtain additional exploration or tests with respect to the
condition; conclude whether the condition falls within any one or more of the differing si te
condition categories in Paragraph 5.04.A; obtain any pertinent cost or schedule information
from Contractor; prepare recommendations to Owner regarding the Contractor’s resumption
of Work in connection with the subsurface or physical condition in question and the need for
any change in the Drawings or Specifications; and advise Owner in writing of Engineer’s
findings, conclusions, and recommendations.
C. Owner’s Statement to Contractor Regarding Site Condition: After receipt of Engineer’s written
findings, conclusions, and recommendations, Owner shall issue a written statement to
Contractor (with a copy to Engineer) regarding the subsurface or physical condition in
question, addressing the resumption of Work in connection with such condition, indicating
whether any change in the Drawings or Specifications will be made, and adopting or rejecting
Engineer’s written findings, conclusions, and recommendations, in whole or in part.
D. Early Resumption of Work: If at any time Engineer determines that Work in con nection with
the subsurface or physical condition in question may resume prior to completion of Engineer’s
review or Owner’s issuance of its statement to Contractor, because the condition in question
has been adequately documented, and analyzed on a prelim inary basis, then the Engineer
may at its discretion instruct Contractor to resume such Work.
E. Possible Price and Times Adjustments
1. Contractor shall be entitled to an equitable adjustment in Contract Price or Contract
Times, to the extent that the existence of a differing subsurface or physical condition, or
any related delay, disruption, or interference, causes an increase or decrease in
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 17 of 70
Contractor’s cost of, or time required for, performance of the Work; subject, however, to
the following:
a. Such condition must fall within any one or more of the categories described in
Paragraph 5.04.A;
b. With respect to Work that is paid for on a unit price basis, any adjustment in Contract
Price will be subject to the provisions of Paragraph 13.03; and,
c. Contractor’s entitlement to an adjustment of the Contract Times is subject to the
provisions of Paragraphs 4.05.D and 4.05.E.
2. Contractor shall not be entitled to any adjustment in the Contract Price or Contract Times
with respect to a subsurface or physical condition if:
a. Contractor knew of the existence of such condition at the time Contractor made a
commitment to Owner with respect to Contract Price and Contract Times by the
submission of a Bid or becoming bound under a negotiated contract, or otherwise;
b. The existence of such condition reasonably could have been discovered or revealed
as a result of any examination, investigation, exploration, test, or study of the Site and
contiguous areas expressly required by the Bidding Requirements or Contract
Documents to be conducted by or for Contractor prior to Contractor’s making such
commitment; or
c. Contractor failed to give the written notice required by Paragraph 5.04.A.
3. If Owner and Contractor agree regarding Contractor’s entitlement to and the amount or
extent of any adjustment in the Contract Price or Contract Times, then any such
adjustment will be set forth in a Change Order.
4. Contractor may submit a Change Proposal regarding its entitlement to or the amount or
extent of any adjustment in the Con tract Price or Contract Times, no later than 30 days
after Owner’s issuance of the Owner’s written statement to Contractor regarding the
subsurface or physical condition in question.
F. Underground Facilities; Hazardous Environmental Conditions : Paragraph 5.05 governs rights
and responsibilities regarding the presence or location of Underground Facilities.
Paragraph 5.06 governs rights and responsibilities regarding Hazardous Environmental
Conditions. The provisions of Paragraphs 5.03 and 5.04 are not applicable to the presence or
location of Underground Facilities, or to Hazardous Environmental Conditions.
5.05 Underground Facilities
A. Contractor’s Responsibilities: Unless it is otherwise expressly provided in the Supplementary
Conditions, the cost of all of the following are included in the Contract Price, and Contractor
shall have full responsibility for:
1. reviewing and checking all information and data regarding existing Underground Facilities
at the Site;
2. complying with applicable state and local u tility damage prevention Laws and
Regulations;
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 18 of 70
3. verifying the actual location of those Underground Facilities shown or indicated in the
Contract Documents as being within the area affected by the Work, by exposing such
Underground Facilities during the course of construction;
4. coordination of the Work with the owners (including Owner) of such Underground
Facilities, during construction; and
5. the safety and protection of all existing Underground Facilities at the Site, and repairing
any damage thereto resulting from the Work.
B. Notice by Contractor: If Contractor believes that an Underground Facility that is uncovered or
revealed at the Site was not shown or indicated on the Drawings, or was not shown or
indicated on the Drawings with reasonable accura cy, then Contractor shall, promptly after
becoming aware thereof and before further disturbing conditions affected thereby or
performing any Work in connection therewith (except in an emergency as required by
Paragraph 7.15), notify Owner and Engineer in writing regarding such Underground Facility.
C. Engineer’s Review: Engineer will:
1. promptly review the Underground Facility and conclude whether such Underground
Facility was not shown or indicated on the Drawings, or was not shown or indicated with
reasonable accuracy;
2. identify and communicate with the owner of the Underground Facility; prepare
recommendations to Owner (and if necessary issue any preliminary instructions to
Contractor) regarding the Contractor’s resumption of Work in connection with th e
Underground Facility in question;
3. obtain any pertinent cost or schedule information from Contractor; determine the extent,
if any, to which a change is required in the Drawings or Specifications to reflect and
document the consequences of the existence or location of the Underground Facility; and
4. advise Owner in writing of Engineer’s findings, conclusions, and recommendations.
During such time, Contractor shall be responsible for the safety and protection of such
Underground Facility.
D. Owner’s Statement to Contractor Regarding Underground Facility: After receipt of Engineer’s
written findings, conclusions, and recommendations, Owner shall issue a written statement
to Contractor (with a copy to Engineer) regarding the Underground Facility in question
addressing the resumption of Work in connection with such Underground Facility, indicating
whether any change in the Drawings or Specifications will be made, and adopting or rejecting
Engineer’s written findings, conclusions, and recommendations in whole or in part.
E. Early Resumption of Work: If at any time Engineer determines that Work in connection with
the Underground Facility may resume prior to completion of Engineer’s review or Owner’s
issuance of its statement to Contractor, because th e Underground Facility in question and
conditions affected by its presence have been adequately documented, and analyzed on a
preliminary basis, then the Engineer may at its discretion instruct Contractor to resume such
Work.
F. Possible Price and Times Adjustments
1. Contractor shall be entitled to an equitable adjustment in the Contract Price or Contract
Times, to the extent that any existing Underground Facility at the Site that was not shown
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 19 of 70
or indicated on the Drawings, or was not shown or indicated wi th reasonable accuracy,
or any related delay, disruption, or interference, causes an increase or decrease in
Contractor’s cost of, or time required for, performance of the Work; subject, however, to
the following:
a. With respect to Work that is paid for on a unit price basis, any adjustment in Contract
Price will be subject to the provisions of Paragraph 13.03;
b. Contractor’s entitlement to an adjustment of the Contract Times is subject to the
provisions of Paragraphs 4.05.D and 4.05.E; and
c. Contractor gave the notice required in Paragraph 5.05.B.
2. If Owner and Contractor agree regarding Contractor’s entitlement to and the amount or
extent of any adjustment in the Contract Price or Contract Times, then any such
adjustment will be set forth in a Change Order.
3. Contractor may submit a Change Proposal regarding its entitlement to or the amount or
extent of any adjustment in the Contract Price or Contract Times, no later than 30 days
after Owner’s issuance of the Owner’s written statement to Contractor re garding the
Underground Facility in question.
4. The information and data shown or indicated on the Drawings with respect to existing
Underground Facilities at the Site is based on information and data (a) furnished by the
owners of such Underground Facilities, or by others, (b) obtained from available records,
or (c) gathered in an investigation conducted in accordance with the current edition of
ASCE 38, Standard Guideline for the Collection and Depiction of Existing Subsurface Utility
Data, by the American Society of Civil Engineers. If such information or data is incorrect
or incomplete, Contractor’s remedies are limited to those set forth in this
Paragraph 5.05.F.
5.06 Hazardous Environmental Conditions at Site
A. Reports and Drawings: The Supplementary Conditions identify:
1. those reports known to Owner relating to Hazardous Environmental Conditions that have
been identified at or adjacent to the Site;
2. drawings known to Owner relating to Hazardous Environmental Conditions that have
been identified at or adjacent to the Site; and
3. Technical Data contained in such reports and drawings.
B. Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the accuracy
of the Technical Data expressly identified in the Supplementary Condition s with respect to
such reports and drawings, but such reports and drawings are not Contract Documents. If no
such express identification has been made, then Contractor may rely on the accuracy of the
Technical Data as defined in Paragraph 1.01.A.46.b. Exce pt for such reliance on Technical
Data, Contractor may not rely upon or make any claim against Owner or Engineer, or any of
their officers, directors, members, partners, employees, agents, consultants, or
subcontractors, with respect to:
1. the completeness of such reports and drawings for Contractor’s purposes, including, but
not limited to, any aspects of the means, methods, techniques, sequences and procedures
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 20 of 70
of construction to be employed by Contractor, and safety precautions and programs
incident thereto;
2. other data, interpretations, opinions, and information contained in such reports or shown
or indicated in such drawings; or
3. any Contractor interpretation of or conclusion drawn from any Technical Data or any such
other data, interpretations, opinions or information.
C. Contractor shall not be responsible for removing or remediating any Hazardous
Environmental Condition encountered, uncovered, or revealed at the Site unless such
removal or remediation is expressly identified in the Contract Docume nts to be within the
scope of the Work.
D. Contractor shall be responsible for controlling, containing, and duly removing all Constituents
of Concern brought to the Site by Contractor, Subcontractors, Suppliers, or anyone else for
whom Contractor is responsible, and for any associated costs; and for the costs of removing
and remediating any Hazardous Environmental Condition created by the presence of any such
Constituents of Concern.
E. If Contractor encounters, uncovers, or reveals a Hazardous Environmenta l Condition whose
removal or remediation is not expressly identified in the Contract Documents as being within
the scope of the Work, or if Contractor or anyone for whom Contractor is responsible creates
a Hazardous Environmental Condition, then Contractor shall immediately: (1) secure or
otherwise isolate such condition; (2) stop all Work in connection with such condition and in
any area affected thereby (except in an emergency as required by Paragraph 7.15); and (3)
notify Owner and Engineer (and promptly thereafter confirm such notice in writing). Owner
shall promptly consult with Engineer concerning the necessity for Owner to retain a qualified
expert to evaluate such condition or take corrective action, if any. Promptly after consulting
with Engineer, O wner shall take such actions as are necessary to permit Owner to timely
obtain required permits and provide Contractor the written notice required by
Paragraph 5.06.F. If Contractor or anyone for whom Contractor is responsible created the
Hazardous Environmental Condition in question, then Owner may remove and remediate the
Hazardous Environmental Condition, and impose a set -off against payments to account for
the associated costs.
F. Contractor shall not resume Work in connection with such Hazardous Enviro nmental
Condition or in any affected area until after Owner has obtained any required permits related
thereto, and delivered written notice to Contractor either (1) specifying that such condition
and any affected area is or has been rendered safe for the r esumption of Work, or (2)
specifying any special conditions under which such Work may be resumed safely.
G. If Owner and Contractor cannot agree as to entitlement to or on the amount or extent, if any,
of any adjustment in Contract Price or Contract Times, as a result of such Work stoppage, such
special conditions under which Work is agreed to be resumed by Contractor, or any costs or
expenses incurred in response to the Hazardous Environmental Condition, then within 30
days of Owner’s written notice regarding the resumption of Work, Contractor may submit a
Change Proposal, or Owner may impose a set -off. Entitlement to any such adjustment is
subject to the provisions of Paragraphs 4.05.D, 4.05.E, 11.07, and 11.08.
H. If, after receipt of such written notice, Contractor does not agree to resume such Work based
on a reasonable belief it is unsafe, or does not agree to resume such Work under such special
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 21 of 70
conditions, then Owner may order the portion of the Work that is in the area affected by such
condition to be deleted from the Work, following the contractual change procedures in
Article 11. Owner may have such deleted portion of the Work performed by Owner’s own
forces or others in accordance with Article 8.
I. To the fullest extent permitted by Laws and Regulations, Owner shall indemnify and hold
harmless Contractor, Subcontractors, and Engineer, and the officers, directors, members,
partners, employees, agents, consultants, and subcontractors of each and any of them, from
and against all claims, costs, losses, and damages (including but not limited to all fees and
charges of engineers, architects, attorneys, and other professionals, and all court, arbitration,
or other dispute resolution costs) arising out of or relating to a Hazardous Environmen tal
Condition, provided that such Hazardous Environmental Condition (1) was not shown or
indicated in the Drawings, Specifications, or other Contract Documents, identified as
Technical Data entitled to limited reliance pursuant to Paragraph 5.06.B, or identified in the
Contract Documents to be included within the scope of the Work, and (2) was not created by
Contractor or by anyone for whom Contractor is responsible. Nothing in this Paragraph 5.06.I
obligates Owner to indemnify any individual or entity fro m and against the consequences of
that individual’s or entity’s own negligence.
J. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold
harmless Owner and Engineer, and the officers, directors, members, partners, emp loyees,
agents, consultants, and subcontractors of each and any of them, from and against all claims,
costs, losses, and damages (including but not limited to all fees and charges of engineers,
architects, attorneys, and other professionals and all court o r arbitration or other dispute
resolution costs) arising out of or relating to the failure to control, contain, or remove a
Constituent of Concern brought to the Site by Contractor or by anyone for whom Contractor
is responsible, or to a Hazardous Environmental Condition created by Contractor or by anyone
for whom Contractor is responsible. Nothing in this Paragraph 5.06.J obligates Contractor to
indemnify any individual or entity from and against the consequences of that individual’s or
entity’s own negligence.
K. The provisions of Paragraphs 5.03, 5.04, and 5.05 do not apply to the presence of Constituents
of Concern or to a Hazardous Environmental Condition uncovered or revealed at the Site.
ARTICLE 6—BONDS AND INSURANCE
6.01 Performance, Payment, and Other Bonds
A. Contractor shall furnish a performance bond and a payment bond, each in an amount at least
equal to the Contract Price, as security for the faithful performance and payment of
Contractor’s obligations under the Contract. These bonds must remain in effect until one year
after the date when final payment becomes due or until completion of the correction period
specified in Paragraph 15.08, whichever is later, except as provided otherwise by Laws or
Regulations, the terms of a prescribed bond form, the Supplementary Conditions, or other
provisions of the Contract.
B. Contractor shall also furnish such other bonds (if any) as are required by the Supplementary
Conditions or other provisions of the Contract.
C. All bonds must be in the form included in the Bidding Documents or otherwise specified by
Owner prior to execution of the Contract, except as provided otherwise by Laws or
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 22 of 70
Regulations, and must be issued and signed by a surety named in “Companies Holding
Certificates of Authority as Acceptable Su reties on Federal Bonds and as Acceptable
Reinsuring Companies” as published in Department Circular 570 (as amended and
supplemented) by the Bureau of the Fiscal Service, U.S. Department of the Treasury. A bond
signed by an agent or attorney -in-fact must b e accompanied by a certified copy of that
individual’s authority to bind the surety. The evidence of authority must show that it is
effective on the date the agent or attorney-in-fact signed the accompanying bond.
D. Contractor shall obtain the required bo nds from surety companies that are duly licensed or
authorized, in the state or jurisdiction in which the Project is located, to issue bonds in the
required amounts.
E. If the surety on a bond furnished by Contractor is declared bankrupt or becomes insolvent, or
the surety ceases to meet the requirements above, then Contractor shall promptly notify
Owner and Engineer in writing and shall, within 20 days after the event giving rise to such
notification, provide another bond and surety, both of which must comply with the bond and
surety requirements above.
F. If Contractor has failed to obtain a required bond, Owner may exclude the Contractor from
the Site and exercise Owner’s termination rights under Article 16.
G. Upon request to Owner from any Subcontractor, Supplier, or other person or entity claiming
to have furnished labor, services, materials, or equipment used in the performance of the
Work, Owner shall provide a copy of the payment bond to such person or entity.
H. Upon request to Contractor from any S ubcontractor, Supplier, or other person or entity
claiming to have furnished labor, services, materials, or equipment used in the performance
of the Work, Contractor shall provide a copy of the payment bond to such person or entity.
6.02 Insurance—General Provisions
A. Owner and Contractor shall obtain and maintain insurance as required in this article and in
the Supplementary Conditions.
B. All insurance required by the Contract to be purchased and maintained by Owner or
Contractor shall be obtained from i nsurance companies that are duly licensed or authorized
in the state or jurisdiction in which the Project is located to issue insurance policies for the
required limits and coverages. Unless a different standard is indicated in the Supplementary
Conditions, all companies that provide insurance policies required under this Contract shall
have an A.M. Best rating of A-VII or better.
C. Alternative forms of insurance coverage, including but not limited to self -insurance and
“Occupational Accident and Excess Employer’s Indemnity Policies,” are not sufficient to meet
the insurance requirements of this Contract, unless expressly allowed in the Supplementary
Conditions.
D. Contractor shall deliver to Owner, with copies to each additional insured identified in the
Contract, certificates of insurance and endorsements establishing that Contractor has
obtained and is maintaining the policies and coverages required by the Contract. Upon
request by Owner or any other insured, Contractor shall also furnish other evidence o f such
required insurance, including but not limited to copies of policies, documentation of
applicable self-insured retentions (if allowed) and deductibles, full disclosure of all relevant
exclusions, and evidence of insurance required to be purchased and maintained by
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 23 of 70
Subcontractors or Suppliers. In any documentation furnished under this provision, Contractor,
Subcontractors, and Suppliers may block out (redact) (1) any confidential premium or pricing
information and (2) any wording specific to a project or jurisdiction other than those
applicable to this Contract.
E. Owner shall deliver to Contractor, with copies to each additional insured identified in the
Contract, certificates of insurance and endorsements establishing that Owner has obtained
and is maintaining the policies and coverages required of Owner by the Contract (if any). Upon
request by Contractor or any other insured, Owner shall also provide other evidence of such
required insurance (if any), including but not limited to copies of policies, documentation of
applicable self -insured retentions (if allowed) and deductibles, and full disclosure of all
relevant exclusions. In any documentation furnished under this provision, Owner may block
out (redact) (1) any confidential premium or pricing information and (2) any wording specific
to a project or jurisdiction other than those relevant to this Contract.
F. Failure of Owner or Contractor to demand such certificates or other evidence of the other
party’s full compliance with these insurance requirements, or failure of Owner or Contractor
to identify a deficiency in compliance from the evidence provided, will not be construed as a
waiver of the other party’s obligation to obtain and maintain such insurance.
G. In addition to the liability insurance re quired to be provided by Contractor, the Owner, at
Owner’s option, may purchase and maintain Owner’s own liability insurance. Owner’s liability
policies, if any, operate separately and independently from policies required to be provided
by Contractor, and Contractor cannot rely upon Owner’s liability policies for any of
Contractor’s obligations to the Owner, Engineer, or third parties.
H. Contractor shall require:
1. Subcontractors to purchase and maintain worker’s compensation, commercial general
liability, and other insurance that is appropriate for their participation in the Project, and
to name as additional insureds Owner and Engineer (and any other individuals or entities
identified in the Supplementary Conditions as additional insureds on Contractor’s liability
policies) on each Subcontractor’s commercial general liability insurance policy; and
2. Suppliers to purchase and maintain insurance that is appropriate for their participation in
the Project.
I. If either party does not purchase or maintain the insurance required of such party by the
Contract, such party shall notify the other party in writing of such failure to purchase prior to
the start of the Work, or of such failure to maintain prior to any change in the required
coverage.
J. If Contractor has failed to obtain and maintain required insurance, Contractor’s entitlement
to enter or remain at the Site will end immediately, and Owner may impose an appropriate
set-off against payment for any associated costs (including but not limited to the cost of
purchasing necessary insurance coverage), and exercise Owner’s termination rights under
Article 16.
K. Without prejudice to any other right or remedy, if a party has failed to obtain required
insurance, the other party may elect (but is in no way obligated) to obtain equivalent
insurance to protect such other party’s interests at the expense of the party who was required
to provide such coverage, and the Contract Price will be adjusted accordingly.
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 24 of 70
L. Owner does not represent that insurance coverage and limits established in this Contract
necessarily will be adequate to protect Contractor or Contractor’s interests. Contractor is
responsible for determining whether such coverage and limits are adequate to protect its
interests, and for obtaining and maintaining any additional insurance that Contractor deems
necessary.
M. The insurance and insurance limits required herein will not be deemed as a limitation on
Contractor’s liability, or that of its Subcontractors or Suppliers, under the indemnities granted
to Owner and other individuals and entities in the Contract or otherwise.
N. All the policies of insurance required to be purchased and maintained under this Contract will
contain a provision or endorsement that the coverage afforded will not be canceled, or
renewal refused, until at least 10 days prior written notice has been given to the purchasing
policyholder. Within three days of receipt of any such written notice, the purchasing
policyholder shall provide a copy of the notice to each other insured and Engineer.
6.03 Contractor’s Insurance
A. Required Insurance : Contractor shall purchase and maintain Worker’s Compensation,
Commercial General Liability, and other insurance pursuant to the specific requirements of
the Supplementary Conditions.
B. General Provisions: The policies of insurance required by this Paragraph 6.03 as supplemented
must:
1. include at least the specific coverages required;
2. be written for not less than the limits provided, or those required by Laws or Regulations,
whichever is greater;
3. remain in effect at least until the Work is complete (as set forth in Paragraph 15.06.D),
and longer if expressly required elsewhere in this Contract, and at all times thereafter
when Contractor may be correcting, removing, or replacing defective Work as a warranty
or correction obligation, or otherwise, or returning to the Site to conduct other tasks
arising from the Contract;
4. apply with respect to the performance of the Work, whether such performance is by
Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed
by any of them to perform any of the Work, or by anyone for whose acts any of them may
be liable; and
5. include all necessary endorsements to support the stated requirements.
C. Additional Insu reds: The Contractor’s commercial general liability, automobile liability,
employer’s liability, umbrella or excess, pollution liability, and unmanned aerial vehicle
liability policies, if required by this Contract, must:
1. include and list as additional insureds Owner and Engineer, and any individuals or entities
identified as additional insureds in the Supplementary Conditions;
2. include coverage for the respective officers, directors, members, partners, employees,
and consultants of all such additional insureds;
3. afford primary coverage to these additional insureds for all claims covered thereby
(including as applicable those arising from both ongoing and completed operations);
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 25 of 70
4. not seek contribution from insurance maintained by the additional insured; and
5. as to commercial general liability insurance, apply to additional insureds with respect to
liability caused in whole or in part by Contractor’s acts or omissions, or the acts and
omissions of those working on Contractor’s behalf, in the performa nce of Contractor’s
operations.
6.04 Builder’s Risk and Other Property Insurance
A. Builder’s Risk: Unless otherwise provided in the Supplementary Conditions, Contractor shall
purchase and maintain builder’s risk insurance upon the Work on a completed value basis, in
the amount of the Work’s full insurable replacement cost (subject to such deductible amounts
as may be provided in the Supplementary Conditions or required by Laws and Regulations).
The specific requirements applicable to the builder’s risk ins urance are set forth in the
Supplementary Conditions.
B. Property Insurance for Facilities of Owner Where Work Will Occur : Owner is responsible for
obtaining and maintaining property insurance covering each existing structure, building, or
facility in which any part of the Work will occur, or to which any part of the Work will attach
or be adjoined. Such property insurance will be written on a special perils (all-risk) form, on a
replacement cost basis, providing coverage consistent with that required for the builder’s risk
insurance, and will be maintained until the Work is complete, as set forth in
Paragraph 15.06.D.
C. Property Insurance for Substantially Complete Facilities : Promptly after Substantial
Completion, and before actual occupancy or use of the substantially completed Work, Owner
will obtain property insurance for such substantially completed Work, and maintain such
property insurance at least until the Work is complete, as set forth in Paragraph 15.06.D. Such
property insurance will be written on a special perils (all -risk) form, on a replacement cost
basis, and provide coverage consistent with that required for the builder’s risk insurance. The
builder’s risk insurance may terminate upon written confirmation of Owner’s procurement of
such property insurance.
D. Partial Occupancy or Use by Owner : If Owner will occupy or use a portion or portions of the
Work prior to Substantial Completion of all the Work, as provided in Paragraph 15.04, then
Owner (directly, if it is the purchaser of the builder’ s risk policy, or through Contractor) will
provide advance notice of such occupancy or use to the builder’s risk insurer, and obtain an
endorsement consenting to the continuation of coverage prior to commencing such partial
occupancy or use.
E. Insurance of Other Property; Additional Insurance: If the express insurance provisions of the
Contract do not require or address the insurance of a property item or interest, then the entity
or individual owning such property item will be responsible for insuring it. If Contractor elects
to obtain other special insurance to be included in or supplement the builder’s risk or property
insurance policies provided under this Paragraph 6.04, it may do so at Contractor’s expense.
6.05 Property Losses; Subrogation
A. The builder’s risk insurance policy purchased and maintained in accordance with
Paragraph 6.04 (or an installation floater policy if authorized by the Supplementary
Conditions), will contain provisions to the effect that in the event of payment of any loss or
damage the insurer will have no rights of recovery against any insureds thereunder, or against
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 26 of 70
Engineer or its consultants, or their officers, directors, members, partners, employees, agents,
consultants, or subcontractors.
1. Owner and Contractor waive al l rights against each other and the respective officers,
directors, members, partners, employees, agents, consultants, and subcontractors of
each and any of them, for all losses and damages caused by, arising out of, or resulting
from any of the perils, ri sks, or causes of loss covered by such policies and any other
property insurance applicable to the Work; and, in addition, waive all such rights against
Engineer, its consultants, all individuals or entities identified in the Supplementary
Conditions as bu ilder’s risk or installation floater insureds, and the officers, directors,
members, partners, employees, agents, consultants, and subcontractors of each and any
of them, under such policies for losses and damages so caused.
2. None of the above waivers extends to the rights that any party making such waiver may
have to the proceeds of insurance held by Owner or Contractor as trustee or fiduciary, or
otherwise payable under any policy so issued.
B. Any property insurance policy maintained by Owner covering any loss, damage, or
consequential loss to Owner’s existing structures, buildings, or facilities in which any part of
the Work will occur, or to which any part of the Work will attach or adjoin; to adjacent
structures, buildings, or facilities of Owner; or to part or all of the completed or substantially
completed Work, during partial occupancy or use pursuant to Paragraph 15.04, after
Substantial Completion pursuant to Paragraph 15.03, or after final payment pursuant to
Paragraph 15.06, will contain provisions to the effect that in the event of payment of any loss
or damage the insurer will have no rights of recovery against any insureds thereunder, or
against Contractor, Subcontractors, or Engineer, or the officers, directors, members, partners,
employees, agents, consultants, or subcontractors of each and any of them, and that the
insured is allowed to waive the insurer’s rights of subrogation in a written contract executed
prior to the loss, damage, or consequential loss.
1. Owner waives all rights agains t Contractor, Subcontractors, and Engineer, and the
officers, directors, members, partners, employees, agents, consultants and
subcontractors of each and any of them, for all losses and damages caused by, arising out
of, or resulting from fire or any of th e perils, risks, or causes of loss covered by such
policies.
C. The waivers in this Paragraph 6.05 include the waiver of rights due to business interruption,
loss of use, or other consequential loss extending beyond direct physical loss or damage to
Owner’s property or the Work caused by, arising out of, or resulting from fire or other insured
peril, risk, or cause of loss.
D. Contractor shall be responsible for assuring that each Subcontract contains provisions
whereby the Subcontractor waives all rights a gainst Owner, Contractor, all individuals or
entities identified in the Supplementary Conditions as insureds, the Engineer and its
consultants, and the officers, directors, members, partners, employees, agents, consultants,
and subcontractors of each and any of them, for all losses and damages caused by, arising out
of, relating to, or resulting from fire or other peril, risk, or cause of loss covered by builder’s
risk insurance, installation floater, and any other property insurance applicable to the Work.
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 27 of 70
6.06 Receipt and Application of Property Insurance Proceeds
A. Any insured loss under the builder’s risk and other policies of property insurance required by
Paragraph 6.04 will be adjusted and settled with the named insured that purchased the policy.
Such named insured shall act as fiduciary for the other insureds, and give notice to such other
insureds that adjustment and settlement of a claim is in progress. Any other insured may state
its position regarding a claim for insured loss in writing within 15 days after notice of such
claim.
B. Proceeds for such insured losses may be made payable by the insurer either jointly to multiple
insureds, or to the named insured that purchased the policy in its own right and as fiduciary
for other insureds, subject to the requirements of any applicable mortgage clause. A named
insured receiving insurance proceeds under the builder’s risk and other policies of insurance
required by Paragraph 6.04 shall maintain such proceeds in a segregated account, and
distribute such proceeds in accordance with such agreement as the parties in interest may
reach, or as otherwise required under the dispute resolution provisions of this Contract or
applicable Laws and Regulations.
C. If no other special agreement is reached, Contractor s hall repair or replace the damaged
Work, using allocated insurance proceeds.
ARTICLE 7—CONTRACTOR’S RESPONSIBILITIES
7.01 Contractor’s Means and Methods of Construction
A. Contractor shall be solely responsible for the means, methods, techniques, sequences , and
procedures of construction.
B. If the Contract Documents note, or Contractor determines, that professional engineering or
other design services are needed to carry out Contractor’s responsibilities for construction
means, methods, techniques, sequences, and procedures, or for Site safety, then Contractor
shall cause such services to be provided by a properly licensed design professional, at
Contractor’s expense. Such services are not Owner -delegated professional design services
under this Contract, an d neither Owner nor Engineer has any responsibility with respect to
(1) Contractor’s determination of the need for such services, (2) the qualifications or licensing
of the design professionals retained or employed by Contractor, (3) the performance of such
services, or (4) any errors, omissions, or defects in such services.
7.02 Supervision and Superintendence
A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting
such attention thereto and applying such skills and expertise as may be necessary to perform
the Work in accordance with the Contract Documents.
B. At all times during the progress of the Work, Contractor shall assign a competent resident
superintendent who will not be replaced without written notice to O wner and Engineer
except under extraordinary circumstances.
7.03 Labor; Working Hours
A. Contractor shall provide competent, suitably qualified personnel to survey and lay out the
Work and perform construction as required by the Contract Documents. Contrac tor shall
maintain good discipline and order at the Site.
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 28 of 70
B. Contractor shall be fully responsible to Owner and Engineer for all acts and omissions of
Contractor’s employees; of Suppliers and Subcontractors, and their employees; and of any
other individuals or entities performing or furnishing any of the Work, just as Contractor is
responsible for Contractor’s own acts and omissions.
C. Except as otherwise required for the safety or protection of persons or the Work or property
at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all
Work at the Site will be performed during regular working hours, Monday through Friday.
Contractor will not perform Work on a Saturday, Sunday, or any legal holiday. Contractor may
perform Work outside regular working hours or on Saturdays, Sundays, or legal holidays only
with Owner’s written consent, which will not be unreasonably withheld.
7.04 Services, Materials, and Equipment
A. Unless otherwise specified in the Contract Documents, Contr actor shall provide and assume
full responsibility for all services, materials, equipment, labor, transportation, construction
equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water,
sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the
performance, testing, start up, and completion of the Work, whether or not such items are
specifically called for in the Contract Documents.
B. All materials and equipment incorporated into the W ork must be new and of good quality,
except as otherwise provided in the Contract Documents. All special warranties and
guarantees required by the Specifications will expressly run to the benefit of Owner. If
required by Engineer, Contractor shall furnish satisfactory evidence (including reports of
required tests) as to the source, kind, and quality of materials and equipment.
C. All materials and equipment must be stored, applied, installed, connected, erected,
protected, used, cleaned, and conditioned in accordance with instructions of the applicable
Supplier, except as otherwise may be provided in the Contract Documents.
7.05 “Or Equals”
A. Contractor’s Request; Governing Criteria : Whenever an item of equipment or material is
specified or described in the Contract Documents by using the names of one or more
proprietary items or specific Suppliers, the Contract Price has been based upon Contractor
furnishing such item as specified. The specification or description of such an item is intended
to establish the type, function, appearance, and quality required. Unless the specification or
description contains or is followed by words reading that no like, equivalent, or “or equal”
item is permitted, Contractor may request that Engineer authorize t he use of other items of
equipment or material, or items from other proposed Suppliers, under the circumstances
described below.
1. If Engineer in its sole discretion determines that an item of equipment or material
proposed by Contractor is functionally equal to that named and sufficiently similar so that
no change in related Work will be required, Engineer will deem it an “or equal” item. For
the purposes of this paragraph, a proposed item of equipment or material will be
considered functionally equal to an item so named if:
a. in the exercise of reasonable judgment Engineer determines that the proposed item:
1) is at least equal in materials of construction, quality, durability, appearance,
strength, and design characteristics;
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 29 of 70
2) will reliably perform at least equally well the function and achieve the results
imposed by the design concept of the completed Project as a functioning whole;
3) has a proven record of performance and availability of responsive service; and
4) is not objectionable to Owner.
b. Contractor certifies that, if the proposed item is approved and incorporated into the
Work:
1) there will be no increase in cost to the Owner or increase in Contract Times; and
2) the item will conform substantially to the detailed requirements of the item
named in the Contract Documents.
B. Contractor’s Expense: Contractor shall provide all data in support of any proposed “or equal”
item at Contractor’s expense.
C. Engineer’s Evaluation and Determination : Engineer will be allowed a reasonable time to
evaluate each “or-equal” request. Engineer may require Contractor to furnish additional data
about the proposed “or-equal” item. Engineer will be the sole judge of acceptability. No “or-
equal” item will be ordered, furnished, installed, or utilized until Engineer’s review is complete
and Engineer determines that the proposed item is an “or-equal,” which will be evidenced by
an approved Shop Drawing or other written communication. Engineer will advise Contractor
in writing of any negative determination.
D. Effect of Engineer’s Determination: Neither approval nor denial of an “or-equal” request will
result in any change in Contract Price. The Engineer’s denial of an “or -equal” request will be
final and binding, and may not be reversed through an appeal under any pro vision of the
Contract.
E. Treatment as a Substitution Request : If Engineer determines that an item of equipment or
material proposed by Contractor does not qualify as an “or -equal” item, Contractor may
request that Engineer consider the item a proposed substitute pursuant to Paragraph 7.06.
7.06 Substitutes
A. Contractor’s Request; Governing Criteria: Unless the specification or description of an item of
equipment or material required to be furnished under the Contract Documents contains or is
followed by words reading that no substitution is permitted, Contractor may request that
Engineer authorize the use of other items of equipment or material under the circumstances
described below. To the extent possible such requests must be made before commencement
of related construction at the Site.
1. Contractor shall submit sufficient information as provided below to allow Engineer to
determine if the item of material or equipment proposed is functionally equivalent to that
named and an acceptable substitute there for. Engineer will not accept requests for
review of proposed substitute items of equipment or material from anyone other than
Contractor.
2. The requirements for review by Engineer will be as set forth in Paragraph 7.06.B, as
supplemented by the Specifications, and as Engineer may decide is appropriate under the
circumstances.
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 30 of 70
3. Contractor shall make written application to Engineer for review of a proposed substitute
item of equipment or material that Contractor seeks to furnish or use. The application:
a. will certify that the proposed substitute item will:
1) perform adequately the functions and achieve the results called for by the
general design;
2) be similar in substance to the item specified; and
3) be suited to the same use as the item specified.
b. will state:
1) the extent, if any, to which the use of the proposed substitute item will
necessitate a change in Contract Times;
2) whether use of the proposed substitute item in the Work will require a change in
any of the Contract Documents (or in the provisions of any other direct contract
with Owner for other work on the Project) to adapt the design to the proposed
substitute item; and
3) whether incorporation or use of the proposed substitute item in connection with
the Work is subject to payment of any license fee or royalty.
c. will identify:
1) all variations of the proposed substitute item from the item specified; and
2) available engineering, sales, maintenance, repair, and replacement services.
d. will contain an itemized estimate of all costs or credits that will result directly or
indirectly from use of such substitute item, including but not limited to changes in
Contract Price, shared savings, costs of redesign, and claims of other contractors
affected by any resulting change.
B. Engineer’s Evaluation and Determination : Engineer will be allowed a reasonable time to
evaluate each substitute request, and to obtain comments and direction from Owner.
Engineer may require Contractor to furnish additional data about the proposed substitut e
item. Engineer will be the sole judge of acceptability. No substitute will be ordered, furnished,
installed, or utilized until Engineer’s review is complete and Engineer determines that the
proposed item is an acceptable substitute. Engineer’s determinat ion will be evidenced by a
Field Order or a proposed Change Order accounting for the substitution itself and all related
impacts, including changes in Contract Price or Contract Times. Engineer will advise
Contractor in writing of any negative determination.
C. Special Guarantee: Owner may require Contractor to furnish at Contractor’s expense a special
performance guarantee or other surety with respect to any substitute.
D. Reimbursement of Engineer’s Cost : Engineer will record Engineer’s costs in evaluatin g a
substitute proposed or submitted by Contractor. Whether or not Engineer approves a
substitute so proposed or submitted by Contractor, Contractor shall reimburse Owner for the
reasonable charges of Engineer for evaluating each such proposed substitute. Contractor shall
also reimburse Owner for the reasonable charges of Engineer for making changes in the
Contract Documents (or in the provisions of any other direct contract with Owner) resulting
from the acceptance of each proposed substitute.
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 31 of 70
E. Contractor’s Expense: Contractor shall provide all data in support of any proposed substitute
at Contractor’s expense.
F. Effect of Engineer’s Determination: If Engineer approves the substitution request, Contractor
shall execute the proposed Change Order and proce ed with the substitution. The Engineer’s
denial of a substitution request will be final and binding, and may not be reversed through an
appeal under any provision of the Contract. Contractor may challenge the scope of
reimbursement costs imposed under Para graph 7.06.D, by timely submittal of a Change
Proposal.
7.07 Concerning Subcontractors and Suppliers
A. Contractor may retain Subcontractors and Suppliers for the performance of parts of the Work.
Such Subcontractors and Suppliers must be acceptable to Owner. The Contractor’s retention
of a Subcontractor or Supplier for the performance of parts of the Work will not relieve
Contractor’s obligation to Owner to perform and complete the Work in accordance with the
Contract Documents.
B. Contractor shall retain specific Subcontractors and Suppliers for the performance of
designated parts of the Work if required by the Contract to do so.
C. Subsequent to the submittal of Contractor’s Bid or final negotiation of the terms of the
Contract, Owner may not require Contractor to retain any Subcontractor or Supplier to furnish
or perform any of the Work against which Contractor has reasonable objection.
D. Prior to entry into any binding subcontract or purchase order, Contractor shall submit to
Owner the identity of the proposed Subcontractor or Supplier (unless Owner has already
deemed such proposed Subcontractor or Supplier acceptable during the bidding process or
otherwise). Such proposed Subcontractor or Supplier shall be deemed acceptable to Owner
unless Owner raises a substantive, reasonable objection within 5 days.
E. Owner may require the replacement of any Subcontractor or Supplier. Owner also may
require Contractor to retain specific replacements; provided, however, that Owner may not
require a re placement to which Contractor has a reasonable objection. If Contractor has
submitted the identity of certain Subcontractors or Suppliers for acceptance by Owner, and
Owner has accepted it (either in writing or by failing to make written objection thereto), then
Owner may subsequently revoke the acceptance of any such Subcontractor or Supplier so
identified solely on the basis of substantive, reasonable objection after due investigation.
Contractor shall submit an acceptable replacement for the rejected Sub contractor or
Supplier.
F. If Owner requires the replacement of any Subcontractor or Supplier retained by Contractor
to perform any part of the Work, then Contractor shall be entitled to an adjustment in
Contract Price or Contract Times, with respect to th e replacement; and Contractor shall
initiate a Change Proposal for such adjustment within 30 days of Owner’s requirement of
replacement.
G. No acceptance by Owner of any such Subcontractor or Supplier, whether initially or as a
replacement, will constitute a waiver of the right of Owner to the completion of the Work in
accordance with the Contract Documents.
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 32 of 70
H. On a monthly basis, Contractor shall submit to Engineer a complete list of all Subcontractors
and Suppliers having a direct contract with Contractor , and of all other Subcontractors and
Suppliers known to Contractor at the time of submittal.
I. Contractor shall be solely responsible for scheduling and coordinating the work of
Subcontractors and Suppliers.
J. The divisions and sections of the Specifications and the identifications of any Drawings do not
control Contractor in dividing the Work among Subcontractors or Suppliers, or in delineating
the Work to be performed by any specific trade.
K. All Work performed for Contractor by a Subcontractor or Sup plier must be pursuant to an
appropriate contractual agreement that specifically binds the Subcontractor or Supplier to
the applicable terms and conditions of the Contract for the benefit of Owner and Engineer.
L. Owner may furnish to any Subcontractor or Supplier, to the extent practicable, information
about amounts paid to Contractor for Work performed for Contractor by the Subcontractor
or Supplier.
M. Contractor shall restrict all Subcontractors and Suppliers from communicating with Engineer
or Owner, except through Contractor or in case of an emergency, or as otherwise expressly
allowed in this Contract.
7.08 Patent Fees and Royalties
A. Contractor shall pay all license fees and royalties and assume all costs incident to the use in
the performance of th e Work or the incorporation in the Work of any invention, design,
process, product, or device which is the subject of patent rights or copyrights held by others.
If an invention, design, process, product, or device is specified in the Contract Documents for
use in the performance of the Work and if, to the actual knowledge of Owner or Engineer, its
use is subject to patent rights or copyrights calling for the payment of any license fee or
royalty to others, the existence of such rights will be disclosed in the Contract Documents.
B. To the fullest extent permitted by Laws and Regulations, Owner shall indemnify and hold
harmless Contractor, and its officers, directors, members, partners, employees, agents,
consultants, and subcontractors, from and against all claims, costs, losses, and damages
(including but not limited to all fees and charges of engineers, architects, attorneys, and other
professionals, and all court or arbitration or other dispute resolution costs) arising out of or
relating to an y infringement of patent rights or copyrights incident to the use in the
performance of the Work or resulting from the incorporation in the Work of any invention,
design, process, product, or device specified in the Contract Documents, but not identified as
being subject to payment of any license fee or royalty to others required by patent rights or
copyrights.
C. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold
harmless Owner and Engineer, and the officers, direc tors, members, partners, employees,
agents, consultants and subcontractors of each and any of them, from and against all claims,
costs, losses, and damages (including but not limited to all fees and charges of engineers,
architects, attorneys, and other pr ofessionals and all court or arbitration or other dispute
resolution costs) arising out of or relating to any infringement of patent rights or copyrights
incident to the use in the performance of the Work or resulting from the incorporation in the
Work of any invention, design, process, product, or device not specified in the Contract
Documents.
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 33 of 70
7.09 Permits
A. Unless otherwise provided in the Contract Documents, Contractor shall obtain and pay for all
construction permits, licenses, and certificates of occ upancy. Owner shall assist Contractor,
when necessary, in obtaining such permits and licenses. Contractor shall pay all governmental
charges and inspection fees necessary for the prosecution of the Work which are applicable
at the time of the submission of Contractor’s Bid (or when Contractor became bound under a
negotiated contract). Owner shall pay all charges of utility owners for connections for
providing permanent service to the Work.
7.10 Taxes
A. Contractor shall pay all sales, consumer, use, and oth er similar taxes required to be paid by
Contractor in accordance with the Laws and Regulations of the place of the Project which are
applicable during the performance of the Work.
7.11 Laws and Regulations
A. Contractor shall give all notices required by a nd shall comply with all Laws and Regulations
applicable to the performance of the Work. Neither Owner nor Engineer shall be responsible
for monitoring Contractor’s compliance with any Laws or Regulations.
B. If Contractor performs any Work or takes any other action knowing or having reason to know
that it is contrary to Laws or Regulations, Contractor shall bear all resulting costs and losses,
and shall indemnify and hold harmless Owner and Engineer, and the officers, directors,
members, partners, employees, agents, consultants, and subcontractors of each and any of
them, from and against all claims, costs, losses, and damages (including but not limited to all
fees and charges of engineers, architects, attorneys, and other professionals and all court or
arbitration or other dispute resolution costs) arising out of or relating to such Work or other
action. It is not Contractor’s responsibility to make certain that the Work described in the
Contract Documents is in accordance with Laws and Regulations, but thi s does not relieve
Contractor of its obligations under Paragraph 3.03.
C. Owner or Contractor may give written notice to the other party of any changes after the
submission of Contractor’s Bid (or after the date when Contractor became bound under a
negotiated contract) in Laws or Regulations having an effect on the cost or time of
performance of the Work, including but not limited to changes in Laws or Regulations having
an effect on procuring permits and on sales, use, value-added, consumption, and other similar
taxes. If Owner and Contractor are unable to agree on entitlement to or on the amount or
extent, if any, of any adjustment in Contract Price or Contract Times resulting from such
changes, then within 30 days of such written notice Contractor may sub mit a Change
Proposal, or Owner may initiate a Claim.
7.12 Record Documents
A. Contractor shall maintain in a safe place at the Site one printed record copy of all Drawings,
Specifications, Addenda, Change Orders, Work Change Directives, Field Orders, writ ten
interpretations and clarifications, and approved Shop Drawings. Contractor shall keep such
record documents in good order and annotate them to show changes made during
construction. These record documents, together with all approved Samples, will be available
to Engineer for reference. Upon completion of the Work, Contractor shall deliver these record
documents to Engineer.
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 34 of 70
7.13 Safety and Protection
A. Contractor shall be solely responsible for initiating, maintaining, and supervising all safety
precautions and programs in connection with the Work. Such responsibility does not relieve
Subcontractors of their responsibility for the safety of persons or property in the performance
of their work, nor for compliance with applicable safety Laws and Regulations.
B. Contractor shall designate a qualified and experienced safety representative whose duties
and responsibilities are the prevention of Work -related accidents and the maintenance and
supervision of safety precautions and programs.
C. Contractor shall t ake all necessary precautions for the safety of, and shall provide the
necessary protection to prevent damage, injury, or loss to:
1. all persons on the Site or who may be affected by the Work;
2. all the Work and materials and equipment to be incorporated therein, whether in storage
on or off the Site; and
3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks,
pavements, roadways, structures, other work in progress, utilities, and Underground
Facilities not designated for removal, relocation, or replacement in the course of
construction.
D. All damage, injury, or loss to any property referred to in Paragraph 7.13.C.2 or 7.13.C.3
caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier,
or any other individual or entity directly or indirectly employed by any of them to perform
any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by
Contractor at its expense (except damage or loss attributable to the fau lt of Drawings or
Specifications or to the acts or omissions of Owner or Engineer or anyone employed by any
of them, or anyone for whose acts any of them may be liable, and not attributable, directly or
indirectly, in whole or in part, to the fault or negl igence of Contractor or any Subcontractor,
Supplier, or other individual or entity directly or indirectly employed by any of them).
E. Contractor shall comply with all applicable Laws and Regulations relating to the safety of
persons or property, or to the protection of persons or property from damage, injury, or loss;
and shall erect and maintain all necessary safeguards for such safety and protection.
F. Contractor shall notify Owner; the owners of adjacent property; the owners of Underground
Facilities and other utilities (if the identity of such owners is known to Contractor); and other
contractors and utility owners performing work at or adjacent to the Site, in writing, when
Contractor knows that prosecution of the Work may affect them, and shall coope rate with
them in the protection, removal, relocation, and replacement of their property or work in
progress.
G. Contractor shall comply with the applicable requirements of Owner’s safety programs, if any.
Any Owner’s safety programs that are applicable to the Work are identified or included in the
Supplementary Conditions or Specifications.
H. Contractor shall inform Owner and Engineer of the specific requirements of Contractor’s
safety program with which Owner’s and Engineer’s employees and representative s must
comply while at the Site.
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 35 of 70
I. Contractor’s duties and responsibilities for safety and protection will continue until all the
Work is completed, Engineer has issued a written notice to Owner and Contractor in
accordance with Paragraph 15.06.C that the Work is acceptable, and Contractor has left the
Site (except as otherwise expressly provided in connection with Substantial Completion).
J. Contractor’s duties and responsibilities for safety and protection will resume whenever
Contractor or any Subcontractor or Supplier returns to the Site to fulfill warranty or correction
obligations, or to conduct other tasks arising from the Contract Documents.
7.14 Hazard Communication Programs
A. Contractor shall be responsible for coordinating any exchange of safety data sheets (formerly
known as material safety data sheets) or other hazard communication information required
to be made available to or exchanged between or among employers at the Site in accordance
with Laws or Regulations.
7.15 Emergencies
A. In emergencies affecting the safety or protection of persons or the Work or property at the
Site or adjacent thereto, Contractor is obligated to act to prevent damage, injury, or loss.
Contractor shall give Engineer prompt written notice if Contractor believes that any significant
changes in the Work or variations from the Contract Documents have been caused by an
emergency, or are required as a result of Contractor’s response to an emergency. If Engineer
determines that a change in the Contract Documents is required because of an emergency or
Contractor’s response, a Work Change Directive or Change Order will be issued.
7.16 Submittals
A. Shop Drawing and Sample Requirements
1. Before submitting a Shop Drawing or Sample, Contractor shall:
a. review and coordi nate the Shop Drawing or Sample with other Shop Drawings and
Samples and with the requirements of the Work and the Contract Documents;
b. determine and verify:
1) all field measurements, quantities, dimensions, specified performance and design
criteria, in stallation requirements, materials, catalog numbers, and similar
information with respect to the Submittal;
2) the suitability of all materials and equipment offered with respect to the indicated
application, fabrication, shipping, handling, storage, assem bly, and installation
pertaining to the performance of the Work; and
3) all information relative to Contractor’s responsibilities for means, methods,
techniques, sequences, and procedures of construction, and safety precautions
and programs incident thereto;
c. confirm that the Submittal is complete with respect to all related data included in the
Submittal.
2. Each Shop Drawing or Sample must bear a stamp or specific written certification that
Contractor has satisfied Contractor’s obligations under the Con tract Documents with
respect to Contractor’s review of that Submittal, and that Contractor approves the
Submittal.
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 36 of 70
3. With each Shop Drawing or Sample, Contractor shall give Engineer specific written notice
of any variations that the Submittal may have fro m the requirements of the Contract
Documents. This notice must be set forth in a written communication separate from the
Submittal; and, in addition, in the case of a Shop Drawing by a specific notation made on
the Shop Drawing itself.
B. Submittal Procedures for Shop Drawings and Samples: Contractor shall label and submit Shop
Drawings and Samples to Engineer for review and approval in accordance with the accepted
Schedule of Submittals.
1. Shop Drawings
a. Contractor shall submit the number of copies required in the Specifications.
b. Data shown on the Shop Drawings must be complete with respect to quantities,
dimensions, specified performance and design criteria, materials, and similar data to
show Engineer the services, materials, and equipment Contracto r proposes to
provide, and to enable Engineer to review the information for the limited purposes
required by Paragraph 7.16.C.
2. Samples
a. Contractor shall submit the number of Samples required in the Specifications.
b. Contractor shall clearly identify each Sample as to material, Supplier, pertinent data
such as catalog numbers, the use for which intended and other data as Engineer may
require to enable Engineer to review the Submittal for the limited purposes required
by Paragraph 7.16.C.
3. Where a Shop Drawing or Sample is required by the Contract Documents or the Schedule
of Submittals, any related Work performed prior to Engineer’s review and approval of the
pertinent submittal will be at the sole expense and responsibility of Contractor.
C. Engineer’s Review of Shop Drawings and Samples
1. Engineer will provide timely review of Shop Drawings and Samples in accordance with the
accepted Schedule of Submittals. Engineer’s review and approval will be only to
determine if the items covered by the Submitta ls will, after installation or incorporation
in the Work, comply with the requirements of the Contract Documents, and be
compatible with the design concept of the completed Project as a functioning whole as
indicated by the Contract Documents.
2. Engineer’s review and approval will not extend to means, methods, techniques,
sequences, or procedures of construction, or to safety precautions or programs incident
thereto.
3. Engineer’s review and approval of a separate item as such will not indicate ap proval of
the assembly in which the item functions.
4. Engineer’s review and approval of a Shop Drawing or Sample will not relieve Contractor
from responsibility for any variation from the requirements of the Contract Documents
unless Contractor has compli ed with the requirements of Paragraph 7.16.A.3 and
Engineer has given written approval of each such variation by specific written notation
thereof incorporated in or accompanying the Shop Drawing or Sample. Engineer will
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 37 of 70
document any such approved variatio n from the requirements of the Contract
Documents in a Field Order or other appropriate Contract modification.
5. Engineer’s review and approval of a Shop Drawing or Sample will not relieve Contractor
from responsibility for complying with the requirements of Paragraphs 7.16.A and B.
6. Engineer’s review and approval of a Shop Drawing or Sample, or of a variation from the
requirements of the Contract Documents, will not, under any circumstances, change the
Contract Times or Contract Price, unless such changes are included in a Change Order.
7. Neither Engineer’s receipt, review, acceptance, or approval of a Shop Drawing or Sample
will result in such item becoming a Contract Document.
8. Contractor shall perform the Work in compliance with the requirements an d
commitments set forth in approved Shop Drawings and Samples, subject to the provisions
of Paragraph 7.16.C.4.
D. Resubmittal Procedures for Shop Drawings and Samples
1. Contractor shall make corrections required by Engineer and shall return the required
number of corrected copies of Shop Drawings and submit, as required, new Samples for
review and approval. Contractor shall direct specific attention in writing to revisions other
than the corrections called for by Engineer on previous Submittals.
2. Contractor shall furnish required Shop Drawing and Sample submittals with sufficient
information and accuracy to obtain required approval of an item with no more than two
resubmittals. Engineer will record Engineer’s time for reviewing a third or subsequent
resubmittal of a Shop Drawing or Sample, and Contractor shall be responsible for
Engineer’s charges to Owner for such time. Owner may impose a set-off against payments
due Contractor to secure reimbursement for such charges.
3. If Contractor requests a change of a previously approved Shop Drawing or Sample,
Contractor shall be responsible for Engineer’s charges to Owner for its review time, and
Owner may impose a set-off against payments due Contractor to secure reimbursement
for such charges, unless the need for such change is beyond the control of Contractor.
E. Submittals Other than Shop Drawings, Samples, and Owner-Delegated Designs
1. The following provisions apply to all Submittals other than Shop Drawings, Samples, and
Owner-delegated designs:
a. Contractor shall submit all such Submittals to the Engineer in accordance with the
Schedule of Submittals and pursuant to the applicable terms of the Contract
Documents.
b. Engineer will provide timely review of all such Submittals in accordance with the
Schedule of Submittals and return such Submittals with a notation of either Accepted
or Not Accepted. Any such Submittal that is not returned within the time established
in the Schedule of Submittals will be deemed accepted.
c. Engineer’s review will be only to det ermine if the Submittal is acceptable under the
requirements of the Contract Documents as to general form and content of the
Submittal.
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 38 of 70
d. If any such Submittal is not accepted, Contractor shall confer with Engineer regarding
the reason for the non-acceptance, and resubmit an acceptable document.
2. Procedures for the submittal and acceptance of the Progress Schedule, the Schedule of
Submittals, and the Schedule of Values are set forth in Paragraphs 2.03. 2.04, and 2.05.
F. Owner-delegated Designs: Submittals pursuant to Owner-delegated designs are governed by
the provisions of Paragraph 7.19.
7.17 Contractor’s General Warranty and Guarantee
A. Contractor warrants and guarantees to Owner that all Work will be in accordance with the
Contract Documents and wil l not be defective. Engineer is entitled to rely on Contractor’s
warranty and guarantee.
B. Owner’s rights under this warranty and guarantee are in addition to, and are not limited by,
Owner’s rights under the correction period provisions of Paragraph 15.08. The time in which
Owner may enforce its warranty and guarantee rights under this Paragraph 7.17 is limited
only by applicable Laws and Regulations restricting actions to enforce such rights; provided,
however, that after the end of the correction period under Paragraph 15.08:
1. Owner shall give Contractor written notice of any defective Work within 60 days of the
discovery that such Work is defective; and
2. Such notice will be deemed the start of an event giving rise to a Claim under
Paragraph 12.01.B, such that any related Claim must be brought within 30 days of the
notice.
C. Contractor’s warranty and guarantee hereunder excludes defects or damage caused by:
1. abuse, or improper modification, maintenance, or operation, by persons other than
Contractor, Subcontractors, Suppliers, or any other individual or entity for whom
Contractor is responsible; or
2. normal wear and tear under normal usage.
D. Contractor’s obligation to perform and complete the Work in accordance with the Contract
Documents is absolute. None of the following will constitute an acceptance of Work that is
not in accordance with the Contract Documents, a release of Contractor’s obligation to
perform the Work in accordance with the Contract Documents, or a release of Owner’s
warranty and guarantee rights under this Paragraph 7.17:
1. Observations by Engineer;
2. Recommendation by Engineer or payment by Owner of any progress or final payment;
3. The issuance of a certificate of Substantial Completion by Engineer or any payment
related thereto by Owner;
4. Use or occupancy of the Work or any part thereof by Owner;
5. Any review and approval of a Shop Drawing or Sample submittal;
6. The issuance of a notice of acceptability by Engineer;
7. The end of the correction period established in Paragraph 15.08;
8. Any inspection, test, or approval by others; or
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 39 of 70
9. Any correction of defective Work by Owner.
E. If the Contract requires the Contractor to accept the assignment of a contract entered into by
Owner, then the specific warranties, guarantees, and correction obligations contained in the
assigned contract will govern with respect to Contractor’s performance obligations to Owner
for the Work described in the assigned contract.
7.18 Indemnification
A. To the fullest extent permitted by La ws and Regulations, and in addition to any other
obligations of Contractor under the Contract or otherwise, Contractor shall indemnify and
hold harmless Owner and Engineer, and the officers, directors, members, partners,
employees, agents, consultants and subcontractors of each and any of them, from losses,
damages, costs, and judgments (including but not limited to all fees and charges of engineers,
architects, attorneys, and other professionals, and all court or arbitration or other dispute
resolution costs) arising from third -party claims or actions relating to or resulting from the
performance or furnishing of the Work, provided that any such claim, action, loss, cost,
judgment or damage is attributable to bodily injury, sickness, disease, or death, or to damage
to or destruction of tangible property (other than the Work itself), including the loss of use
resulting therefrom, but only to the extent caused by any negligent act or omission of
Contractor, any Subcontractor, any Supplier, or any individual or entity directly or indirectly
employed by any of them to perform any of the Work, or anyone for whose acts any of them
may be liable.
B. In any and all claims against Owner or Engineer, or any of their officers, directors, members,
partners, employees, agents, consultants, or subcontractors, by any employee (or the survivor
or personal representative of such employee) of Contractor, any Subcontractor, any Supplier,
or any individual or entity directly or indirectly employed by any of them to perform any of
the Work, or anyone for whose acts any of them may be liable, the indemnification obligation
under Paragraph 7.18.A will not be limited in any way by any limitation on the amount or type
of damages, compensation, or benefits payable by or for Contractor o r any such
Subcontractor, Supplier, or other individual or entity under workers’ compensation acts,
disability benefit acts, or other employee benefit acts.
7.19 Delegation of Professional Design Services
A. Owner may require Contractor to provide professi onal design services for a portion of the
Work by express delegation in the Contract Documents. Such delegation will specify the
performance and design criteria that such services must satisfy, and the Submittals that
Contractor must furnish to Engineer with respect to the Owner-delegated design.
B. Contractor shall cause such Owner -delegated professional design services to be provided
pursuant to the professional standard of care by a properly licensed design professional,
whose signature and seal must app ear on all drawings, calculations, specifications,
certifications, and Submittals prepared by such design professional. Such design professional
must issue all certifications of design required by Laws and Regulations.
C. If a Shop Drawing or other Submitt al related to the Owner -delegated design is prepared by
Contractor, a Subcontractor, or others for submittal to Engineer, then such Shop Drawing or
other Submittal must bear the written approval of Contractor’s design professional when
submitted by Contractor to Engineer.
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 40 of 70
D. Owner and Engineer shall be entitled to rely upon the adequacy, accuracy, and completeness
of the services, certifications, and approvals performed or provided by the design
professionals retained or employed by Contractor under an Owner-delegated design, subject
to the professional standard of care and the performance and design criteria stated in the
Contract Documents.
E. Pursuant to this Paragraph 7.19, Engineer’s review, approval, and other determinations
regarding design drawings, calculations, specifications, certifications, and other Submittals
furnished by Contractor pursuant to an Owner-delegated design will be only for the following
limited purposes:
1. Checking for conformance with the requirements of this Paragraph 7.19;
2. Confirming that Contractor (through its design professionals) has used the performance
and design criteria specified in the Contract Documents; and
3. Establishing that the design furnished by Contractor is consistent with the design concept
expressed in the Contract Documents.
F. Contractor shall not be responsible for the adequacy of performance or design criteria
specified by Owner or Engineer.
G. Contractor is not required to provide professional services in violation of applicable Laws and
Regulations.
ARTICLE 8—OTHER WORK AT THE SITE
8.01 Other Work
A. In addition to and apart from the Work under the Contract Documents, the Owner may
perform other work at or adjacent to the Site. Such other work may be performed by Owner’s
employees, or through contract s between the Owner and third parties. Owner may also
arrange to have third -party utility owners perform work on their utilities and facilities at or
adjacent to the Site.
B. If Owner performs other work at or adjacent to the Site with Owner’s employees, or through
contracts for such other work, then Owner shall give Contractor written notice thereof prior
to starting any such other work. If Owner has advance information regarding the start of any
third-party utility work that Owner has arranged to take pla ce at or adjacent to the Site,
Owner shall provide such information to Contractor.
C. Contractor shall afford proper and safe access to the Site to each contractor that performs
such other work, each utility owner performing other work, and Owner, if Owner is
performing other work with Owner’s employees, and provide a reasonable opportunity for
the introduction and storage of materials and equipment and the execution of such other
work.
D. Contractor shall do all cutting, fitting, and patching of the Work t hat may be required to
properly connect or otherwise make its several parts come together and properly integrate
with such other work. Contractor shall not endanger any work of others by cutting,
excavating, or otherwise altering such work; provided, howev er, that Contractor may cut or
alter others' work with the written consent of Engineer and the others whose work will be
affected.
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 41 of 70
E. If the proper execution or results of any part of Contractor’s Work depends upon work
performed by others, Contractor shal l inspect such other work and promptly report to
Engineer in writing any delays, defects, or deficiencies in such other work that render it
unavailable or unsuitable for the proper execution and results of Contractor’s Work.
Contractor’s failure to so repo rt will constitute an acceptance of such other work as fit and
proper for integration with Contractor’s Work except for latent defects and deficiencies in
such other work.
F. The provisions of this article are not applicable to work that is performed by th ird-party
utilities or other third -party entities without a contract with Owner, or that is performed
without having been arranged by Owner. If such work occurs, then any related delay,
disruption, or interference incurred by Contractor is governed by the provisions of
Paragraph 4.05.C.3.
8.02 Coordination
A. If Owner intends to contract with others for the performance of other work at or adjacent to
the Site, to perform other work at or adjacent to the Site with Owner’s employees, or to
arrange to have utility owners perform work at or adjacent to the Site, the following will be
set forth in the Supplementary Conditions or provided to Contractor prior to the start of any
such other work:
1. The identity of the individual or entity that will have authority a nd responsibility for
coordination of the activities among the various contractors;
2. An itemization of the specific matters to be covered by such authority and responsibility;
and
3. The extent of such authority and responsibilities.
B. Unless otherwise provided in the Supplementary Conditions, Owner shall have sole authority
and responsibility for such coordination.
8.03 Legal Relationships
A. If, in the course of performing other work for Owner at or adjacent to the Site, the Owner’s
employees, any othe r contractor working for Owner, or any utility owner that Owner has
arranged to perform work, causes damage to the Work or to the property of Contractor or its
Subcontractors, or delays, disrupts, interferes with, or increases the scope or cost of the
performance of the Work, through actions or inaction, then Contractor shall be entitled to an
equitable adjustment in the Contract Price or the Contract Times. Contractor must submit any
Change Proposal seeking an equitable adjustment in the Contract Price or the Contract Times
under this paragraph within 30 days of the damaging, delaying, disrupting, or interfering
event. The entitlement to, and extent of, any such equitable adjustment will take into account
information (if any) regarding such other work that was provided to Contractor in the Contract
Documents prior to the submittal of the Bid or the final negotiation of the terms of the
Contract, and any remedies available to Contractor under Laws or Regulations concerning
utility action or inaction. When app licable, any such equitable adjustment in Contract Price
will be conditioned on Contractor assigning to Owner all Contractor’s rights against such other
contractor or utility owner with respect to the damage, delay, disruption, or interference that
is the subject of the adjustment. Contractor’s entitlement to an adjustment of the Contract
Times or Contract Price is subject to the provisions of Paragraphs 4.05.D and 4.05.E.
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 42 of 70
B. Contractor shall take reasonable and customary measures to avoid damaging, delaying,
disrupting, or interfering with the work of Owner, any other contractor, or any utility owner
performing other work at or adjacent to the Site.
1. If Contractor fails to take such measures and as a result damages, delays, disrupts, or
interferes with the work of any such other contractor or utility owner, then Owner may
impose a set-off against payments due Contractor, and assign to such other contractor or
utility owner the Owner’s contractual rights against Contractor with respect to the breach
of the obligations set forth in this Paragraph 8.03.B.
2. When Owner is performing other work at or adjacent to the Site with Owner’s employees,
Contractor shall be liable to Owner for damage to such other work, and for the reasonable
direct dela y, disruption, and interference costs incurred by Owner as a result of
Contractor’s failure to take reasonable and customary measures with respect to Owner’s
other work. In response to such damage, delay, disruption, or interference, Owner may
impose a set-off against payments due Contractor.
C. If Contractor damages, delays, disrupts, or interferes with the work of any other contractor,
or any utility owner performing other work at or adjacent to the Site, through Contractor’s
failure to take reasonable an d customary measures to avoid such impacts, or if any claim
arising out of Contractor’s actions, inactions, or negligence in performance of the Work at or
adjacent to the Site is made by any such other contractor or utility owner against Contractor,
Owner, or Engineer, then Contractor shall (1) promptly attempt to settle the claim as to all
parties through negotiations with such other contractor or utility owner, or otherwise resolve
the claim by arbitration or other dispute resolution proceeding or at law, and (2) indemnify
and hold harmless Owner and Engineer, and the officers, directors, members, partners,
employees, agents, consultants and subcontractors of each and any of them from and against
any such claims, and against all costs, losses, and damages (including but not limited to all
fees and charges of engineers, architects, attorneys, and other professionals and all court or
arbitration or other dispute resolution costs) arising out of or relating to such damage, delay,
disruption, or interference.
ARTICLE 9—OWNER’S RESPONSIBILITIES
9.01 Communications to Contractor
A. Except as otherwise provided in these General Conditions, Owner shall issue all
communications to Contractor through Engineer.
9.02 Replacement of Engineer
A. Owner may at its discretio n appoint an engineer to replace Engineer, provided Contractor
makes no reasonable objection to the replacement engineer. The replacement engineer’s
status under the Contract Documents will be that of the former Engineer.
9.03 Furnish Data
A. Owner shall promptly furnish the data required of Owner under the Contract Documents.
9.04 Pay When Due
A. Owner shall make payments to Contractor when they are due as provided in the Agreement.
INTERNAL USE ONLY
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 43 of 70
9.05 Lands and Easements; Reports, Tests, and Drawings
A. Owner’s duties with respect to providing lands and easements are set forth in Paragraph 5.01.
B. Owner’s duties with respect to providing engineering surveys to establish reference points
are set forth in Paragraph 4.03.
C. Article 5 refers to Owner’s identifying and making available to Contractor copies of reports of
explorations and tests of conditions at the Site, and drawings of physical conditions relating
to existing surface or subsurface structures at the Site.
9.06 Insurance
A. Owner’s responsibilities, if a ny, with respect to purchasing and maintaining liability and
property insurance are set forth in Article 6.
9.07 Change Orders
A. Owner’s responsibilities with respect to Change Orders are set forth in Article 11.
9.08 Inspections, Tests, and Approvals
A. Owner’s responsibility with respect to certain inspections, tests, and approvals is set forth in
Paragraph 14.02.B.
9.09 Limitations on Owner’s Responsibilities
A. The Owner shall not supervise, direct, or have control or authority over, nor be responsible
for, Contractor’s means, methods, techniques, sequences, or procedures of construction, or
the safety precautions and programs incident thereto, or for any failure of Contractor to
comply with Laws and Regulations applicable to the performance of the Work. Owner will not
be responsible for Contractor’s failure to perform the Work in accordance with the Contr
Text truncated. Open the original for the full document.