County Board — Agenda Packet
Green County · Green County · Board of Supervisors · meeting of Sep 8, 2026 · Agenda packets
Open the original document More from Green County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
www.greencountywi.org
PLEASE NOTE: Upon reasonable notice, efforts will be made to accommodate the needs of individuals with disabilities
through sign language, interpreters or other auxiliary aids.
For additional information or to request the service, contact the Green County Clerk’s Office at (608) 328-9430.
GREEN COUNTY BOARD OF SUPERVISORS
Jerry Guth, Chair
Kristi Leonard, First Vice-Chair | Melissa Even, Second Vice-Chair
Tuesday, September 8, 2026 at 7:00 PM
Green County Highway Shop
2813 6th Street, Monroe, WI 53566
BOARD OF SUPERVISORS MEETING AGENDA
1. Call to Order
2. Roll Call
3. Pledge of Allegiance
4. Approval of Minutes
i. Approval of the August 13, 2026 County Board Meeting Minutes
5. Presentations
i. Presentation and Discussion on Highway Facility Project: Facility Assessment
6. Adjourn
Arianna L. Voegeli, Green County Clerk
1
PROCEEDINGS OF THE GREEN COUNTY BOARD OF SUPERVISORS
August 13, 2026
County Boardroom, Green County Courthouse, 1016 16th Ave, Monroe, WI
Chair Jerry Guth called the meeting to order at 7:00 p.m.
The Clerk read the roll call with 26 present with 2 virtual being Roth and Tschudy, and 5 excused
absences being Burchard, Jones, Leach, Rikkers and Vestin.
The Board recited the Pledge of Allegiance.
Motion by Gundlach, seconded by Kranig to approve the minutes of the July 14, 2026, meeting. Motion
carried by a unanimous voice vote.
A Highway operations presentation was given by Highway Commissioner Chris Narveson, Highway
Operations Specialist Barry Einbeck and Maintenance Director Dick Marti.
RESOLUTION 8-1-26
RESOLUTION FOR INCLUSION UNDER THE ETF INCOME CONTINUATION INSURANCE PLAN
WHEREAS, the Wisconsin Employee Trust Fund offers a voluntary Income Continuation Insurance (ICI)
program that replaces a portion of an employee’s income if the employee is unable to work because of
sickness or injury (both short and long term); and
WHEREAS, Employers are required to pay a minimum contribution, which is equal to the gross premium
for the 180-day elimination period. Employers may choose to contribute more to employees’ premiums to an
amount equal to the gross premium for a shorter elimination period. As elimination periods become shorter,
the premium cost increases; and
WHEREAS, an employee can choose a shorter elimination period than that offered by their employer,
and pay the difference in cost between their choice and the elimination period the employer for which the
employer has elected to pay the gross premium.
WHEREAS, the county elects a 30-day elimination period that Green County will pay the gross ICI
premium for
BE IT RESOLVED, by the of the County Board of Supervisors of Green County, in legal session
assembled, that pursuant to the provisions of Section 40.61 of the Wisconsin Statutes, hereby determines to
offer the Income Continuation Insurance Plan to eligible personnel through the program of the State of
Wisconsin Group Insurance Board, and agrees to abide by the terms of the plan as set forth in the contract
between the Group Insurance Board and the Administrator; and
BE IT FURTHER RESOLVED that the county elects a 30-day elimination period that Green County will
pay the gross ICI premium for; and
BE IT FURTHER RESOLVED The resolution shall be effective on the later of the 1 st of the month on or
after 90 days following its receipt at the Department of Employee Trust Funds, or January 1, 2027; and
BE IT FURTHER RESOLVED that the proper officers are herewith authorized and directed to take all
actions and make salary deductions for premiums and submit payments required by the State of Wisconsin
Group Insurance Board to provide such Income Continuation Insurance.
SIGNED: PERSONNEL AND LABOR RELATIONS COMMITTEE
Jerry Guth, Chair Michael Furgal, Vice-chair
Kristi Leonard Joe Snow
Todd Larson Russ Torkelson
Dave Tschudy
Motion by Leonard, seconded by Torkelson to approve Resolution 8-1-26. Motion carried by a
unanimous voice vote.
RESOLUTION 8-2-26
RESOLUTION AUTHORIZING THE PURCHASE OF REAL PROPERTY FOR BRIDGE
CONSTRUCTION IN THE TOWN OF ADAMS
WHEREAS, Green County, Wisconsin, through its Highway Department, plans to construct a
replacement bridge in the Town of Adams to maintain public safety, infrastructure standards, and
reliable travel; and
WHEREAS, to accomplish the construction of said bridge, it is necessary for Green County to
acquire title to two (2) parcels of land situated in the Town of Adams, Green County, Wisconsin;
and
2
WHEREAS, the Green County Highway Committee has reviewed the legal descriptions, fair
market valuations, and purchase agreements for the subject properties, identified under
Transportation Project Plat 5646-00-07-4.01, recorded as Document No. 642176 in Green
County, Wisconsin, detailed as:
• Parcel 1 (Project No. 5646-00-07 / Date: 7/6/2026):
Parcel 1 of Transportation Project Plat 5646-00-07-4.01 recorded as Document No.
642176, and recorded in Green County, Wisconsin.
Area: 13,785 SF
Property Interests and Rights: Fee Title
Owner: Craig M Carter and Carolyn R Carter
Purchase Price: $2,620.00 (plus $3.03 disposition tax; Total: $2,623.03)
• Parcel 2 (Project No. 5646-00-07 / Date: 7/28/2026):
Parcel 2 of Transportation Project Plat 5646-00-07-4.01 recorded as Document No.
642176, and recorded in Green County, Wisconsin.
Area: 841 SF
Property Interests and Rights: Fee Title
Owner: Kristi S Langhus Living Trust
Purchase Price: $200.04 (plus $0.04 disposition tax; Total: $200.08); and
WHEREAS, funding for the acquisition of these parcels is available within the budgeted
project funds allocated for the Town of Adams Bridge Project.
NOW, THEREFORE, BE IT RESOLVED by the Board of Supervisors of Green County,
Wisconsin, in legal session assembled, that the purchase of the above-described parcels of
property for a total acquisition cost of $2,823.11 ($2,820.04 purchase price plus $3.07 disposition
tax) is hereby approved.
BE IT FURTHER RESOLVED that the County Board Chair and the County Clerk (or Highway
Commissioner) are authorized and directed to execute all necessary deeds, agreements, and
closing documents on behalf of Green County to complete the real estate transaction.
SIGNED: PROPERTY, PARKS AND INSURANCE COMMITTEE:
Dennis Schwartz, Chair Joe Snow, Vice-Chair
Pat Silver Larry Kranig
Casey Jones
Motion by Schwartz, seconded by Kranig to approve Resolution 8-2-26. Motion carried by a
unanimous voice vote.
RESOLUTION 8-3-26
Resolution Approving PVNH Contract (Over $150,000)
WHEREAS, County Code Section 1-11-2, entitled COUNTY PURCHASES AND CONTRACTS,
provides for review, approval and execution of all County contracts and purchases necessary to carry out
approved budget operations; and
WHEREAS, Section 1-11-2(A)(3) STATES: Cost or price in excess of one hundred and fifty
thousand dollars ($150,000.00), recommendation by the appropriate department head and the supervisory
committee to the full County Board with approval by the full Board before the purchase is made.
Execution of the contract documents shall be by the Green County Board Chair and the appropriate
Committee Chairperson, after the document has been reviewed by the Green County Corporation
Counsel.
NOW, THEREFORE, BE IT RESOLVED by the Green County Board of Supervisors, in legal session
assembled, that the Board approve the recommendation of the Pleasant View Nursing Home Oversight
Committee for the following contract in the year 2026:
CLIPBOARD/TWO MAGNETS AGENCY STAFFING $1,200,000
3
SIGNED: PLEASANT VIEW NURSING HOME OVERSIGHT COMMITTEE
Todd Larson, Chair Peg Sheaffer, Vice-Chair
Jim Brown Larry Kranig
Jane Skelton
REVIEWED AND APPROVED BY:
Todd Larson, Chair Jerry Guth Brian Bucholtz
PVNH Oversight Committee County Board Chair Corporation Counsel
Motion by Larson, seconded by Knox to approve Resolution 8-3-26. Motion carried by a unanimous
voice vote.
ORDINANCE 26-0801
Amendment of Title 1 Chapter 6 County Officers
WHEREAS, the Personnel and Labor Relations Committee has supervision over general required
changes, updates and modifications to the Green County Code Title 1, Chapter 6, which lays out County
officers; and
WHEREAS, after review of the Green County Code, the Personnel and Labor Relations Committee
has indicated that the Green County Code is in need of updating to reflect duties of the County
Administrator; and
NOW, THEREFORE, BE IT ORDAINED by the Green County Board of Supervisors, in legal session
assembled, that the following sections of Title 1 Chapter 6 of the Green County Code be amended as
follows:
1-6-6: CORPORATION COUNSEL
1-6-6-1: OFFICE ESTABLISHED
Pursuant to the provisions of §59.42(1), Wis. Stats., authorizing counties to employ an attorney being
called a “Corporation Counsel”; and for the purpose of providing experienced legal advice for Green
County at the pleasure of the County Board.
The Corporation Counsel shall not perform legal work or legal services for any private clients for which he
or she receives remuneration.
Upon a vacancy in the position of Green County Corporation Counsel, the Personnel and Labor Relations
Committee shall announce the opening of the position and shall accept and review available applicants
and shall recommend a qualified applicant to the County Board for ratification. Upon the ratification by a
majority vote of all the members of the County Board of Supervisors, the Corporation Counsel shall be
appointed to serve a two (2) year term. The appointment of such Corporation Counsel may be terminated
at any time by a majority vote by all members of the County Board of Supervisors.
The Personnel and Labor Relations Committee may in its discretion present the current holder of the
office of Corporation Counsel to the full Board for ratification at the beginning of each two (2) year term
without accepting and reviewing new applications.
The Green County Corporation Counsel shall report to and be under the supervision of the Personnel and
Labor Relations Committee.
The County Administrator shall appoint the Corporation Counsel subject to confirmation by the County
Board by a majority vote. The County Administrator shall evaluate the Corporation Counsel with input from
the Personnel and Labor Relations Committee. The Corporation Counsel may be removed by the County
Administrator with the concurrence of the County Board.
(R6-2-84, eff. 9-1-84) (Ord. 9800101) (Ord. 21-0901, 9/14/2021)
1-6-8: HIGHWAY COMMISSIONER
The office of the Green County Highway Commissioner shall be filled upon the nomination and election of
a person to that position by the County Board. Each County Highway Commissioner so elected shall serve
a 2-year term of office, subject to the satisfactory completion of a 6-month probationary period during his
or her initial term of office. The County Administrator shall appoint the Highway Commissioner subject to
confirmation by the County Board by a majority vote. The County Administrator shall evaluate the Highway
Commissioner with input from the Highway Committee. The Highway Commissioner may be removed by
the County Administrator with the concurrence of the County Board. (Ord. 11-1101, 11/8/2011)
4
SIGNED: PERSONNEL AND LABOR RELATIONS COMMITTEE
Jerry Guth, Chair Michael Furgal, Vice-Chair
Todd Larson Kristi Leonard
Joe Snow Russ Torkelson
David Tschudy
Motion by Furgal, seconded by Leonard to approve Ordinance 26-0801. Motion carried by a
unanimous voice vote.
APPOINTMENTS: Angela MacLennan as the Corporation Counsel for Green County. Motion by Furgal,
seconded by Larson to approve the aforementioned appointment. Motion carried by a unanimous voice
vote.
ANNOUNCEMENTS: County Clerk Arianna Voegeli gave an update on the issues that happened on
election night. Nik Owen informed the board that there will be a public informational meeting on data
centers, and County Board Chair Guth congratulated Brian Bucholtz on his retirement and thanked him for
his years of service with the county.
DISTRIBUTIONS: Green County Library Fast Facts 2025 and Highway Department Annual Report and
a Wisconsin County Officials Directory.
Motion by Donovan, seconded by Kubly to adjourn at 8:07 p.m. Motion carried by a unanimous voice
vote.
STATE OF WISCONSIN )
)ss
COUNTY OF GREEN )
I, Arianna L. Voegeli, County Clerk, in and for said County, do hereby certify that the above and
foregoing is a true and correct copy of the proceedings of the County Board of Supervisors of Green
County, Wisconsin, on their meeting of August 13, 2026, A.D.
Arianna L. Voegeli
Green County Clerk
GREEN COUNTY, WISCONSIN
HIGHWAY
DEPARTMENT
FACILITY
ASSESSMENT
September 8, 2026
MONROE LOCATION BEFORE
GREEN COUNTY HIGHWAY DEPARTMENT
December 2024
MONROE LOCATION AFTER
GREEN COUNTY HIGHWAY DEPARTMENT
August 2026
CURRENT HIGHWAY DEPARTMENT PROGRAM
6
LOCATIONS
Monroe, New Glarus, Brodhead,
GG, J/C & Attica
15
BUILDINGS
Total Heated, Tempered*, Cold
Storage (All Locations)
5.5
ACRES
Main Hwy Dept. Site
78,400 SF
Before Jail & Sheriff’s Office Project
62,800 SF
20% Reduction After Jail & Sheriff’s Office Project
GREEN COUNTY HIGHWAY DEPARTMENT
*Tempered means wood framed, metal structure, heated to 55 degrees
Administration, Crew
& Heated Garage
Built in 1964
12,600 SF
Metal Building
(Non-Sprinklered)
• Code-Compliant Issues
• Lack of Necessary Functions
• Sanitary, Privacy, & Health Risks
• Deteriorating & Inefficient Building
• Low Water Supply – Can’t Efficiently Wash Trucks
HIGHWAY ADMIN, CREW, & HEATED GARAGE
GREEN COUNTY HIGHWAY DEPARTMENT
Minimal insulation in walls
HIGHWAY ADMIN, CREW, & HEATED GARAGE
GREEN COUNTY HIGHWAY DEPARTMENT
Inefficient brine-making operation. Rusted cabinets. The air exchange unit is disabled.
HIGHWAY ADMIN, CREW, & HEATED GARAGE
GREEN COUNTY HIGHWAY DEPARTMENT
Overhead Door is in bad shape.
HIGHWAY ADMIN, CREW, & HEATED GARAGE
GREEN COUNTY HIGHWAY DEPARTMENT
Non-compliant heaters are not properly vented.
HIGHWAY ADMIN, CREW, & HEATED GARAGE
GREEN COUNTY HIGHWAY DEPARTMENT
The facility lacks a proper wash bay.
HIGHWAY ADMIN, CREW, & HEATED GARAGE
GREEN COUNTY HIGHWAY DEPARTMENT
Crew Lunch Area is not code-compliant. It poses sanitation, health, and ventilation concerns for the crew.
HIGHWAY ADMIN, CREW, & HEATED GARAGE
GREEN COUNTY HIGHWAY DEPARTMENT
The makeshift locker room is not code-compliant. Does not allow for privacy and lacks basic functions.
HIGHWAY ADMIN, CREW, & HEATED GARAGE
GREEN COUNTY HIGHWAY DEPARTMENT
The facility is deteriorating due to brine operations.
HIGHWAY ADMIN, CREW, & HEATED GARAGE
GREEN COUNTY HIGHWAY DEPARTMENT
Restrooms are not code-compliant for the number of staff and crew. ADA accessibility issues.
HIGHWAY ADMIN, CREW, & HEATED GARAGE
GREEN COUNTY HIGHWAY DEPARTMENT
Mechanical equipment is aging, has no fresh air intake, and needs to be replaced soon.
HIGHWAY ADMIN, CREW, & HEATED GARAGE
GREEN COUNTY HIGHWAY DEPARTMENT
No IT closet in offices.
Mechanic Shop
Built in 1937
13,600 SF
Masonry Construction
(Non-Sprinklered)
• Code-Compliant Issues
• Lack of Equipment and Tool Storage
• Need Window Replacements
• Ventilation System is Past Useful Life
MECHANIC SHOP
GREEN COUNTY HIGHWAY DEPARTMENT
Boarded-up windows have mold behind the wood. Unsafe ice dam at the entrance.
MECHANIC SHOP
GREEN COUNTY HIGHWAY DEPARTMENT
No Mechanic’s Tool Storage. Mechanics store tools on the back of trucks and move around shop.
MECHANIC SHOP
GREEN COUNTY HIGHWAY DEPARTMENT
The Parts room is crowded and filling offices. Also stored upstairs and in the basement due to lack of space.
MECHANIC SHOP
GREEN COUNTY HIGHWAY DEPARTMENT
Small overhead doors in the shop. Trucks need to squeeze in with limited space to move around.
MECHANIC SHOP
GREEN COUNTY HIGHWAY DEPARTMENT
Boarded up windows have mold growing on them.
MECHANIC SHOP
GREEN COUNTY HIGHWAY DEPARTMENT
HVAC is at the end of its lifespan capacity and falling apart, often dripping on crews.
MECHANIC SHOP
GREEN COUNTY HIGHWAY DEPARTMENT
The floor is uneven, has bad joints, and needs repair.
Grease, Tire, & Sign
Shop
Built in 1950
6,800 SF
Metal Building
(Non-Sprinklered)
• Code-Compliant Issues
• Tight Quarters & Crowded Working Space
• No Exhaust Ventilation
GREASE, TIRE, & SIGN SHOP
GREEN COUNTY HIGHWAY DEPARTMENT
No wall insulation. Air exchangers are disabled.
GREASE, TIRE, & SIGN SHOP
GREEN COUNTY HIGHWAY DEPARTMENT
Limited for space. We park 5 plow trucks in there in the winter. We also add plastic to insulate windows.
GREASE, TIRE, & SIGN SHOP
GREEN COUNTY HIGHWAY DEPARTMENT
No exhaust ventilation except a makeshift box that workers open. Needs proper ventilation for crew safety.
GREASE, TIRE, & SIGN SHOP
GREEN COUNTY HIGHWAY DEPARTMENT
Oil areas are all stored properly in plastic per requirements. The working area is extremely limited.
Salt Sheds & Chip
Storage
Built in 1964, 1987, 2019
14,600 SF
Timber Framed / Wood Siding
Aluminum Structure / Canvas
• Height Limitations
• Missing Basic Building Components
• Makeshift building is Not Suited for Long-Term Storage
• Lack of Material Storage
SALT SHEDS & CHIP STORAGE
GREEN COUNTY HIGHWAY DEPARTMENT
Salt/Chip Shed ceiling is too low. The entry has been dug out so vehicles can enter the shed.
SALT SHEDS & CHIP STORAGE
GREEN COUNTY HIGHWAY DEPARTMENT
Makeshift vinyl structure was erected for chip storage. Now moved behind circular salt shed.
SALT SHEDS & CHIP STORAGE
GREEN COUNTY HIGHWAY DEPARTMENT
The salt shed should have a door for proper storage.
Tempered & Cold
Storage Sheds
Built in 1964, 1987, 2019
15,200 SF (5,000 Tempered)
Wood Frame / Metal Siding
(Non-Sprinklered)
• Not Enough Storage Space
• Trucks are Parked in Cold Storage (Should be Tempered or Heated)
• Equipment is Tightly Packed
• Difficult to Maneuver Equipment
TEMPERED & COLD STORAGE SHEDS
GREEN COUNTY HIGHWAY DEPARTMENT
In some cases, equipment is tightly packed which makes maneuvering equipment hard.
Overall Site
Built in 1937 - 2019
5.5 Acres
8 Buildings
• Lack of Necessary Storage
• Site Constraints
SITE
GREEN COUNTY HIGHWAY DEPARTMENT
Culverts and guardrails are no longer on site. Everything in the photo has been removed or relocated.
SITE
GREEN COUNTY HIGHWAY DEPARTMENT
Fueling stations are inconveniently laid out. Often congestion and long lines to use them.
Buildings Taken
Down
Built in 1947 & 2009
15,600 SF
Metal Frame
Wood Frame / Metal Siding
• End of Useful Life
• Taken Down for New Jail & Sheriff’s Office
SUMMARY OF ISSUES (ENTIRE CAMPUS)
Safety of staff
Buildings at the end of their useful life
Lack of space for daily operations
Inefficiencies
Not energy efficient
ADA Standards
Potential for liability
GREEN COUNTY HIGHWAY DEPARTMENT
QUESTION & ANSWER
GREEN COUNTY HIGHWAY DEPARTMENT
Source: Green County website. First collected Oct 11, 2026.