09.17.2026 City Council Agenda & Packet
City of Waterloo · Jefferson County · meeting of Sep 17, 2026 · Agenda packets
Open the original document More from City of Waterloo
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
136 North Monroe Street
Waterloo, Wisconsin 53594-1198
Phone (920) 478-3025
Fax (920) 478-2021
_____________________
CITY OF WATERLOO COUNCIL AGENDA
COUNCIL CHAMBER OF THE MUNICIPAL BUILDING – 136 N. MONROE STREET
Thursday, September 17, 2026 – 7:00 p.m.
Pursuant to Section 19.84 Wisconsin Statutes, notice is hereby given to the public and news media, that a public meeting will be held to consider the following:
1.) CALL TO ORDER, PLEDGE OF ALLEGIANCE & ROLL CALL
2.) MEETING MINUTES APPROVAL: September 3, 2026
3.) CITIZEN INPUT / PUBLIC COMMENT (3-Minute time limit)
4.) MEETING SUMMARIES (since last Council meeting)
a. 09/09/2026, 09/14/2026, 09/17/2026 Finance
b. 09/10/2026 Cable Board
5.) CONSENT AGENDA ITEMS
a. Reports of City Officials & Contract Service Providers
i. Fire & Emergency Medical Services
ii. Building Inspections
iii. Public Works
iv. Police
v. Library Board
vi. Water & Light Utility Commission
vii. Watertown Humane Society
viii. Cable TV
6.) NEW BUSINESS
a. ThriveED Presentation
7.) RECOMMENDATIONS OF BOARDS, COMMITTEES AND COMMISSIONS
a. Finance, Insurance and Personnel
i. July 2026 Financial Statements: Payroll $__________, General Disbursements $______________ and
Clerk/Treasurer’s Reports [see Municipal Website]
ii. August 2026 Financial Statements: Payroll $__________, General Disbursements $______________ and
Clerk/Treasurer’s Reports [see Municipal Website]
b. Resolution #2026-44 Infrastructure Reserve Account
c. Resolution #2026-45 Excess General Fund Transfer
d. Ordinance #2026-09 Amending Section 53-12 C (1)
e. Resolution #2026-50 Authorization to create RFP for Comprehensive Plan and Zoning Ordinance updates, per Purchasing
Policy dollar limit.
f. Resolution #2026-51 Authorization of Contingency Funds for Duct Work at City Hall
g. Resolution #2026-52 Drumlin Fields Development Agreement
h. Resolution #2026-53 Authorizing a Temporary 10% Compensation Increase for City Clerk Job Duties
i. Resolution #2026-54 Authorizing Payout of Comp Time for Parks Coordinator Gabe Haberkorn
j. Hiring new City Clerk & City Treasurer
i. [NOTE: The City Council may meet in closed session per Wis. Stat. 19.85(1)(c) “considering employment, promotion,
compensation or performance evaluation data of any public employee over which the governmental body has
jurisdiction or exercise responsibility. Upon concluding a closed session, the Committee will reconvene in open
session.]
8.) FUTURE AGENDA ITEMS AND ANNOUNCEMENTS
9.) ADJOURNMENT
Denise Knutson
Interim City Clerk Posted & Emailed: 09/16/2026.
PLEASE NOTE: It is possible that members of and possibly a quorum of members of other governmental bodies of the municipality may be in attendance at the above meeting(s)
to gather information. No action will be taken by any governmental body other than that specifically noted. Also, upon reasonable notice, efforts will be made to accommodate the
needs of disabled individuals through appropriate aids and services. For additional information or to request such services please contact the clerk’s office at the above location
CITY OF WATERLOO COMMON COUNCIL - MEETING MINUTES: September 3, 2026
[a digital recording of this meeting also serves as the official record]
1. CALL TO ORDER, PLEDGE OF ALLEGIANCE & ROLL CALL: Mayor Quimby called the meeting to order at 7:00 p.m.
Alderpersons present: S. Cummings, DJ Dorn, C. Kuhl, J. Zimmermann, T. Thomas, and J. Haseleu. Absent: R. Weihert .
Others attending in-person: Police Chief Warner, Park Coordinator Haberkorn, DPW Director Yerges, Utility Supervisor
Sorensen, Fire Chief Butzine, Asst. Fire Chief Whitebird, Officer Randy Burns, Chris Hauptli, Don Nell, Keri Sellnow, Nate
Heise, Jessie Wilkening, and WLOO Videographers. The Pledge of Allegiance was recited.
2. MEETING MINUTES APPROVAL: August 20, 2026. MOTION: Motion by Cummings to approve meeting minutes, seconded by
Dorn. VOICE VOTE: Motion Carried 6-0.
3. CITIZEN INPUT / PUBLIC COMMENT (3-Minute time limit): Don Nell spoke on the Petrie subdivision not becoming solar farms
on McKay Way.
4. MEETING SUMMARIES (since last Council meeting)
a. 08/24/2026 Fire/EMS
b. 08/25/2026 Plan Commission
c. 08/24/2026 Library Board
d. 09/01/2026 Water & Light
e. 09/03/2026 Public Safety
f. 09/03/2026 Public Works – Cancelled
5. NEW BUSINESS
a. Resolution 2026-47 Opposing Proposed BECI 765 Kilo Transmission Line: Mayor Quimby discussed the proposed line
and early plans. Discussion. MOTION: Motion by Dorn approve Resolution 2026-47, seconded by Zimmermann.
VOICE VOTE: Motion Carried 5-0-1 with Kuhl Abstaining.
b. Resolution 2026-49 Approve Purchase of E-ONE Aluminum Typhoon HP75 Aerial Ladder: Kuhl discussed the timing
of the situation and Ehlers input on the purchase. Discussion. MOTION: Motion by Kuhl to approve Resolution 2026-
49, seconded by Haseleu. ROLL CALL VOTE: Motion Carried 6-0.
6. RECOMMENDATIONS OF BOARDS, COMMITTEES, AND COMMISSIONS
a. PLAN COMMISSION
i. Resolution #2026-22 Abandonment of a portion of Public Right-of-Way between 318 E. Polk St to 255
Jefferson Street: Mayor Quimby spoke briefly on the resolution and that is now corrected and up to date.
Discussion. MOTION: Motion by Thomas to approve Resolution 2026-22, seconded by Zimmermann.
VOICE VOTE: Motion Carried 6-0.
ii. Highland Terrace Preliminary Plat Approval: Mayor Quimby discussed the Highland Terrace Preliminary Plat
and the need for the resolution before going for final plat approval. Discussion. MOTION: Motion by Cummings
to approve the Highland Terrace Preliminary Plat, seconded by Dorn. VOICE VOTE: Motion Carried 6-0.
iii. Resolution #2026-46 Execution of Road-to-Road Deeded Acceptance and Municipal Services Payment
Agreement with MV21, LLC: Mayor Quimby spoke on the utilities and roadway on Highland Terrace. Utilities
Supervisor Sorensen discussed that they would need assessed value on the sewer & utilities from 1996-
present. Discussion. MOTION: Motion by Kuhl to approve Resolution 2026-46, seconded by Zimmermann.
ROLL CALL VOTE: Motion Carried 5-1 with Thomas as Nay
b. PUBLIC SAFETY
i. Application for Special Event for Waterloo High School Homecoming Parade: Cummings spoke on the
Homecoming Application for the annual parade. Discussion. MOTION: Motion by Cummings to approve the
Special Event for Waterloo High School Homecoming Parade, seconded by Dorn. VOICE VOTE: Motion
Carried 6-0.
c. WATER & LIGHT
i. Resolution to approve Amendment No. 3 to Long Term Power Supply Contract for Participating Members:
Sorensen discussed the need for a new contract and Resolution 2026-48. Discussion. MOTION: Motion by
Cummings to approve Resolution 2026-48, seconded by Dorn. ROLL CALL VOTE: Motion Carried 6-0.
7. FUTURE AGENDA ITEMS AND ANNOUNCEMENTS
a. Resolution 2026-44 Infrastructure Reserve Account
b. Resolution 2026-45 Excess General Fund Transfer
c. Ordinance 2026-09 Amending Section 53-12 C (1)
d. Next Meeting September 17, 2026, at 7:00 pm City Council Chambers, 136 N. Monroe Steet, Waterloo, WI, 53594
8. FUTURE AGENDA ITEMS AND ANNOUNCEMENTS: Zimmermann spoke on the upcoming Wiener & Kraut Day festivities.
9. ADJOURNMENT: MOTION: Motion by Cummings to adjourn, seconded by Kuhl. VOICE VOTE:Motion Carried 6-0. 7:51 pm
Attest: Charlie Kuhl, Council President
Regular Fire/EMS Meeting Minutes
August 24, 2026
Meeting called to order: 1905
Roll call taken
Minutes read by Tina Lange. Motion to accept by Eric Cotting, 2nd by Dan Wilson.
Public comments here none.
OLD BUSINESS:
EMS Schedule – check schedule. Watch for any full time vacation time.
Family days – Looking for suggestions on this. Possibly cookouts for football games.
SOG’s – still in process of working through. 100 series are finished. Once all series have been reviewed
and updated an email will be sent out to members. Goal for this is by end of year. Any suggestions or
concerns please bring up to officers.
Jefferson County EMS tax – Meeting will be set up for more discussion within the county. This would
come straight to the departments for personnel only. This EMS tax is for staffing only. More
discussion will be made for 2027 rollout. Would raise taxes around $70/year per household. Around
$181,000/year for our jurisdiction per statistics. If monies are not used up from departments/services,
it would stay at the county level. This is NOT in leu of the regular yearly budget
JSCO will be doing MABAS dispatching drills starting Aug. 6th. This will be the first Thursday of each
month.
Will need volunteers for High Schools home games. Possibly using 3rd ambulance for this.
NEW BUSINESS:
Updates to Meetings:
o Chief stated 2027 budget discussion (city) – opportunity to purchase a 2026 EONE ladder that is
already built for a savings around $5-600,000. The city is checking with Ehlers (financial
advisors). Purchasing cost would be around $1.4 million. Other departments are interested.
The townships are on board with the purchase.
With this, a brush truck will be pushed back for purchase until 2028. SCBA’s and a
command vehicle are still on track for 2027 budget.
Capital outlay budget items were accepted by finance committee pending Ehlers review.
o Capt. Herring stated Milford township was updated on the grant for the purchasing of fire gear.
Boots have been fitted and ordered for members.
Upcoming monthly training:
o EMS – Quarterlies with Aurora
o Fire – Roof extrication and ladders
o MPO – NO training - Holiday
o JOINT – Search and Rescue
Past fire calls: CO Alarm – N. Monroe; Sussek Machine – Alarm on sprinkler system; Auto Aid Marshall
– disregard grill fire; Michael Ln. – burning smell in house; E. Madison/Portland Rd. – drone request per
PD for missing subject.
Upcoming training: POST on 8/29; Haz Mat tech course in Janesville coming up; Ag Rescue in
Marshfield 10/23-24; MPO class in Marshall Sept-Dec 2026.
Fire/EMS Meeting Min Cont. Aug 2026
Appreciation Dinner – Due to the regular date being booked, members had a discussion on changing
date, venue, changing direction of appreciation, or cancellation. Came up with still wanting a dinner
with retirees present. Look into The Riverfront and try to work around the original date. Committee
was made Tina Lange, Cassie Theis and Tirri Goodrich. Anyone wanting to help out, let Tina know.
Dodge County Firefighters Association – need a representative for these meeting from our
department. These are on 4th Monday of the month in Juneau.
Truck starters: Fire – Kory Wilke, Brian Macias, Dan Wilson; EMS – Aiden Ciha and Kevin Seibert.
Door prizes: Jack and Colton
Meeting adjourned 2000
Minutes taken/typed by Tina Lange
Regular Meeting Minutes
July 27, 2026
Meeting called to order: 1808
Roll call taken
Minutes read by Tina Lange. Motion to accept by Eric Cotting, 2nd by Dan Wilson.
No public comments.
OLD BUSINESS:
EMS Schedule – check schedule. Watch for any full time vacation time.
SOG’s - being reviewed.
Trek 100 went very well. Thank you to all that assisted.
Asst. Chief Whitebird had set up a summer event. Got interrupted by calls but will try again in the
future months.
Jefferson County dispatching updates – Chief stated dispatch is requesting all fire addresses being
added to MABAS cards with a code # assigned to them. Dispatch will then use this Code when pulled
and know what is needed. Will make it our own. No need to acknowledge page while enroute for
MABAS calls. Working on cutting down radio traffic. Also, when you take a pass on truck/personnel
dept cannot change its mind – only if another card or alarm is asked for.
JSCO will be doing MABAS dispatching drills starting Aug. 6th. This will be the first Thursday of each
month.
EMD dispatching – this is still be worked on. Dispatch will not send out fire directly unless requested
(EMS assist, hazards – trees down, wires down). Talking with Waterloo PD about dispatching fire/EMS
out if needed.
Box alarms should be using IFERN.
NEW BUSINESS:
Updates to Meetings:
o Chief stated 2026 budget discussions have been started with townships. He was told about the
5 years plan the townships received from city and some changes were made. Chief would
appreciate any insight/suggestions from the membership on the budget process.
o Jefferson County Fire Chief’s - A possibility of a Jefferson County EMS tax through the county of
a .25 mil rate is being discussed. This would come straight to the departments for personnel
only. Reasoning is to help maintain volunteers/full-time staff. More discussion will be made for
2027 rollout. Would raise taxes around $70/year per household. Around $181,000/year for
our jurisdiction per statistics. If monies are not used up from departments/services, it would
stay at the county level. This is NOT in leu of the regular yearly budget.
Dodge County Fair – first aid volunteers needed Sunday August 16. Sign up will be on the board.
Upcoming monthly training:
o EMS – Quarterlies with Aurora
o Fire – Extrication
o MPO – Proactive and EVOC
o JOINT – Search and Rescue
Fire/EMS Meeting Min Cont. Aug 2026
Past fire calls: Gas smell at Piggly Wiggly – pilot light in kitchen; illegal burn called in by PD; MA
Johnson Creek – staging responded to school; CO Alarm Lexington Way – nothing found; MA Johnson
Creek Bar – fire out before responding; Down wires – reminder even if you don’t see arching/active
sparking the wires could still be LIVE, be cautious; Powerline overloaded on W. Madison st; Natural gas
at city hall; MA Jefferson shed fire – hauled 6,000 ga.;
EMS call review: Crew had issues calling in report to UW East on phone line, stated this is not
appropriate and should call on radio, this issue has been rectified. They would PREFER radio EMS
report, but calling via phone line is optional.
o On 2nd out calls and needing Sun Prairie EMS reach out to Dane County directly first for request
EMS, then contact Jefferson County to let them know. Also, Paramedic intercepts from Dane
County. Less wait time.
Upcoming training: POST on 8/29; Haz Mat tech course in Janesville coming up; Ag Rescue in
Marshfield 10/23-24; MPO class in Marshall Sept-Dec 2026.
Bylaw updates – looking at updating “reapplication” claws Article 4. Clarifications need to be on how
long being inactive and coming back, where medical leave stands, ect. Asst. Chief Whitebird brought
up a draft of wording for upcoming Jan bylaw changes.
Vern Butzine brought up for Supporters when going to inactive status as a member, being put as an
honorary for the supporters if member would like to be. Discussion was made on a timeline. This will
be reviewed more at September supporters meeting.
Truck starters: Fire – Aiden Ciha, Mitch Lauersdorf, Scott Baumann; EMS – Casey and Eric Cotting.
Door prizes: Kevin and Ben
Meeting adjourned 1950
Minutes taken/typed by Tina Lange
PUBLIC SAFETY AND HEALTH COMMITTEE MEETING MINUTES
September 3rd, 2026
1. Call to Order:
The Public Safety Committee meeting was called to order by Alderperson Cummings at
6:00PM
2. Roll Call:
Committee members present – Alderperson Dorn, Cummings, Chief Warner
3. Approval of Public Safety Committee Minutes of June 4th, 2026. Motion by Dorn, to
approve Prior minutes of July 2nd, 2026, second by Alderperson Cummings, motion
carried.
4. Public Comment: None:
5. New Business:
a.) Special Event Permit Application: Waterloo School District Homecoming Parade.
Discussion, Alderperson Dorn Motioned to Approve, Alderperson Cumings Seconded
– Motioned Carried
6. Blight Report: Chief Warner updated and discussed blight report with alderpersons
7. Future Agenda Items, Communications, and announcements: Next meeting October
1st, 2026 at 6:00 pm. Alderperson Cumming wants Food and Beverage cart ordinance put
onto next agenda meeting for discussion. Referred to next meeting October 1st, 2026
9. Adjourn: Motion to Adjourn by Dorn motion, Seconded by Cumings motion
carried at 6:07 pm
Karl Junginger Memorial Library
Board of Trustees Meeting Minutes
August 24, 2026 @ 5:30 pm
I. Call to Order & Introductions
The meeting was called to order at 5:31 p.m. Present: Art Biermeier, Diane Graff, Tracy
Grant, Claire Jones, Leslie Fugate, Cindy Krueger, Sara Cummings, and Kelli Mountford.
II. Approval of agenda
The agenda was approved as written
III. Approval of open minutes from July 22, 2026.
Fugate moved to approve the July 2026 minutes. Cummings seconded. The motion
passed unanimously.
IV. Correspondence, Appearance, Public Comments –
V. Director’s Report
VI. Unfinished Business
A. Financial monthly report for July 2026 - Action
Cummings moved to approve the July 2026 monthly invoices as presented. Grants
seconded. The motion passed unanimously.
B. Masonry Project – Informational
C. Roof Insurance Claim- Informational
D. 2027 Capital Budget – Action
Grant moved to approve the 2027 Capital Budget. Krueger seconded. The motion passed
unanimously.
E. 2027 Budget – Action
Krueger moved to approve the 2027 Budget. Fugate seconded. The motion passed
unanimously.
F. Kelli’s 2026 accomplishments and 2027 goals – Informational
VII. New Business
Cummings moved to move items B through before A under the New Business on the
agenda. Grant seconded. The motion passed unanimously
The Library Board will convene to a Closed Session on the matter per State Statute 19.85(1)(c)
“considering employment, promotion, compensation, or performance evaluation data of any
public employee over which the body has jurisdiction or exercises responsibility.” The
committee will reconvene in an open session upon the conclusion of the closed session.
A. Library Director Evaluation – Action
Cummings moved to go into closed session. Fugate seconded. The motion passed
unanimously.
B. Ellen Dudley Fund and Donation – Informational
C. Job Description “Director” – Informational
D. Policy 510 Unattended Children – Informational
E. Review and Discuss Library Board Trustee Handbook Chapter 4 “Effective Board
meetings and trustee Participation” – Informational
VIII. Future agenda items – Budget 2026/2027, Job Description – Director, Policy 510
IX. Date, place, and time of the next City Finance/Board meeting: Monday, September 14,
2026 @ 5:30 pm in the Junginger Community Room
X. Date, place, and time of the next regular meeting: Wednesday, September 23 at 5:30
p.m. in the Hyer Conference Room
XI. Adjournment
Cummings moved to adjourn at 6:55 p.m. Jones seconded. The motion passed
unanimously.
Respectfully submitted
Cindy Krueger
Karl Junginger Memorial Library / Mayor/Council/Board Report - AUGUST 2026
AUGUST Monthly Statistics JAN FEB MARCH APRIL MAY JUNE JULY AUG SEPT OCT NOV DEC
Library Card Holders 2025 2301 2315 2317 2330 2353 2400 2422 2432 2439 2446 2460 2457
2026 2465 2365 2377 2388 2388 2423 2451 2459
% of Change 7.13% 2.16% 2.59% 2.49% 1.46% 0.96% 1.20% 1.11%
NEW Library Card Holders NEW STATS 2025 13 18 20 25 30 47 24 14 12 21 16 6
2026 12 8 17 13 6 34 16 30
% of Change -7.69% -55.56% -15.00% -48.00% -80.00% -27.66% -33.33% 114.29%
Checkouts (Circulation) 2025 4662 4182 4539 4122 4134 6254 6777 4945 4562 4401 3783 4206
2026 4616 4470 4379 4021 3730 5948 5747 4892
% of Change -0.99% 6.89% -3.53% -2.45% -9.77% -4.89% -15.20% -1.07%
eBook/Audio Checkouts 2025 868 856 840 909 935 950 1029 1041 1036 1111 1045 976
(Circulation) 2026 1081 963 1069 1106 928 968 1079 1034
% of Change 24.54% 12.50% 27.26% 21.67% -0.75% 1.89% 4.86% -0.67%
Library Visits 2025 1956 1970 2384 2280 2387 3002 2997 2142 2048 2037 1854 1790
2026 1785 2021 2231 2129 2140 2745 2869 1942
% of Change -8.74% 2.59% -6.42% -6.62% -10.35% -8.56% -4.27% -9.34%
Meeting Room Use 2025 9 17 20 18 9 13 13 18 8 11 9 10
BY PUBLIC 2026 20 17 18 18 12 14 14 22
Community & Conference % of Change 122.22% 0.00% -10.00% 0.00% 33.33% 7.69% 7.69% 22.22%
Public Computer Use 2025 77 73 105 100 108 97 80 72 75 80 80 86
2026 85 98 90 95 59 78 76 70
% of Change 10.39% 34.25% -14.29% -5.00% -45.37% -19.59% -5.00% -2.78%
WiFi Use 2025 230 232 200 217 202 209 202 179 190 179 171 119
2026 134 150 152 195 160 192 175 171
% of Change -41.74% -35.34% -24.00% -10.14% -20.79% -8.13% -13.37% -4.47%
Outreach to local schools, 2025 114 186 131 139 109 83 50 80 78 63 62 213
daycares, & residents 2026 62 209 63 99 123 66 49 64
Checkouts % of Change -45.61% 12.37% -51.91% -28.78% 12.84% -20.48% -2.00% -20.00%
Adult Number of Programs 2025 15 14 18 15 15 16 18 17 14 16 19 15
2026 18 19 16 15 16 19 14 17
% of Change 20.00% 35.71% -11.11% 0.00% 6.67% 18.75% -22.22% 0.00%
Adult Attendance 2025 197 103 188 119 197 261 153 117 79 196 116 100
2026 188 136 109 119 164 281 85 97
% of Change -4.57% 32.04% -42.02% 0.00% -16.75% 7.66% -44.44% -17.09%
Teen (12-18) 2025 4 3 3 1 0 7 10 1 2 3 3 2
Number of programs 2026 3 3 2 2 2 6 10 3
% of Change -25.00% 0.00% -33.33% 100.00% 200.00% -14.29% 0.00% 200.00%
Attendance 2025 21 10 24 24 0 185 99 36 36 41 32 24
2026 52 50 47 28 47 167 139 46
% of Change 52.38% 400.00% 95.83% 16.67% 4700.00% -9.73% 40.40% 27.78%
Children's 2025 12 14 12 17 13 19 28 12 14 16 13 13
Number of programs 2026 11 11 8 9 7 15 20 10
% of Change -8.33% -21.43% -33.33% -47.06% -46.15% -21.05% -28.57% -16.67%
Attendance 2025 286 254 267 281 244 1044 1064 302 263 395 278 247
2026 323 270 242 265 230 975 1097 218
% of Change 12.94% 6.30% -9.36% -5.69% -5.74% -6.61% 3.10% -27.81%
GENERAL ALL AGE PROGRAMS
Number of Programs NEW 2025 1 1 1 4 4 4 4 1 2 3 2 2
2026 1 1 3 3 3 5 4 1
% of Change 0.00% 0.00% 200.00% -94.23% -25.00% 25.00% 0.00% 0.00%
Attendance NEW 2025 69 67 84 342 699 671 185 97 133 254 121 227
2026 122 70 250 140 697 615 132 75
% of Change 76.81% 4.48% 197.62% -59.06% -0.29% -8.35% -28.65% -22.68%
Regular meeting of the Waterloo Water & Light Commission held September 1, 2026
Meeting called to order by President Schumann at 7:00pm at the Waterloo Utilities office. Present were
Commissioners Vern Butzine, Pam Kuhl, Michael Tschanz, Superintendent Barry Sorenson, and Charlie Kuhl.
Absent Richard Weihert.
Minutes
Motion by Schumann, seconded by Butzine, to approve the minutes of the August 4, 2026 meeting with the
exception to change “Customer Compliant” to “Customer Complaint”. Motion carried.
Expenditures
Motion by Tschanz, seconded by Kuhl, to approve the August disbursements as presented. Motion carried.
Citizen Input
None.
WPPI Contract Extension
Motion by Schumann, seconded by Butzine, to recommend to City Council approval of the WPPI contract
extension to 2073. Motion carried.
Solar PV Tariff Group Tariff Filing
Motion by Schumann, seconded by Kuhl, to approve the filing in the group Solar PV Tariff filing. Motion carried.
Electric Jobs
Sorenson review the electric jobs.
Motion by Butzine, seconded by Tschanz, to adjourn the meeting at 7:45pm. Motion carried.
Respectfully submitted,
Pam Kuhl - Secretary
List of Bills
Alternate Technologies Inc 295.90 Northern Lake Service 641.73
Axley Brynelson 1,191.90 OpenPoint 650.00
BMO 1,262.54 Portland Sanitary District 20,114.36
BMO Mastercard 3,316.20 Portzen Construction 154,610.97
Border States 636.20 Payment Service Network 12.95
City of Waterloo Treasurer 62,902.08 Payroll 144,117.34
Crescent Electric Supply 579.00 Piggly Wiggly 19.95
Frontier 389.21 Resco 1,569.48
Forster Electrical Engineering 5,987.50 Seera 1,321.71
GFC Leasing 207.41 SJE 8,866.99
GLS Utility 1,475.75 T Mobile 205.32
Griffin Repair 338.00 UPS 115.03
Hawkins 1,845.84 United Liquid Waste Recycling 2,255.28
Howie's Hardware 369.18 Waterloo Building Center 92.50
Infosend 1,401.04 Waterloo Utilities 11,028.84
Irby 14,813.30 WE Energies 141.83
Kpress & Trends 524.00 Wisconsin Dept. of Revenue 6,810.23
Kwik Trip 1,428.07 WPPI Energy 343,926.67
Lake Country Heating & Cooling 471.95 Wolf Paving & Excavating 1,109.95
Leader Independent 45.59
Marshall Plumbing 3,002.00
Total Disbursements $800,093.79
Checking Account
Balance 7/31/26 446,565.37
Deposits 737,893.50
Disbursements (799,610.59)
Interest 218.23
Balance 8/31/26 $385,066.51
WWTP DNR Replacement Fund
Balance 7/31/26 $754,939.21
Deposit/ (Withdrawal) (113.10)
Interest 1,229.67
Balance 8/31/26 $756,055.78
Debt Service Account
Balance 7/31/26 $659,092.04
Deposit 117,930.00
Bond Payment/Svc Fees (85.75)
Interest 1,123.14
Balance 8/31/26 $778,059.43
Money Market Account
Balance 7/31/26 1,725,287.99
Deposits
Transfer
Disbursements (284.35)
Interest
Balance 8/31/26 $1,725,003.64
Transportation Fund
Balance 7/31/26 $61,257.00
Transfer
Balance 8/31/26 $61,257.00
WWTP USDA Bond Reserve:
Balance 7/31/26 $186,219.25
Transferred in/out
Interest
Service Charge
Balance 8/31/26 $186,219.25
Avestar CD #3596 (Bond Reserve):
Balance 7/31/26 353,629.14
Interest 2,865.36
Balance 8/31/26 $356,494.50
LGIP (Bond Reserve):
Balance 7/31/26 $255,332.67
Interest $797.18
Balance 8/31/26 $256,129.85
Construction Acct:
Balance 7/31/26 $1,500.00
Transferred in
Balance 8/31/26 $1,500.00
MINUTES for August 13th 2026 CATV Board Meeting at 5:00 pm
The Solarium, 575 West Madison St. Waterloo, WI
1. Call to Order and Roll Call – called to order at 5:06pm, Kovacs/McKay/Cotting present, Manager Nightoak and Director
Sparks present
2. Approval of Previously Unapproved Meeting Minutes from July 9 th, 2026 –Cotting/Kovacs, McKay abstained, approved
with no corrections at 5:08pm
3. Citizen Input – Manager Nightoak reported a citizen asked about Water Tower footage; due to staffing cost restrictions to
maintain budget, this is postponed
4. Manager’s report: In Packet – no questions, contact information assistance provided by Cotting to Nightoak
5. New Business
A. 2027 Budget (Informational) – will vote on during September Board meeting; extensive discussion about cutting
costs including rent and managing increases in multiple expenses including internet access
B. Equipment repair (Action) – repair cost was under limit needed for Board approval, so no vote needed at 5:53pm
C. Wiener & Kraut Day (Informational and Discussion) – WLOO manager, director, staff, and Board are all
contributing time and effort to make this a successful first event for WLOO
D. Waterloo Business Association (Informational) – discussion
E. Vision Statement review (Informational) – Board review postponed until videographers can approve/deny/change
drafted language
6. Unfinished Business
A. Historical Society (Informational) – Manager Nightoak will be meeting with current President of the Society soon
B. Upcoming WLOO CATV Events (Informational) - for the remainder of the year: Wiener and Kraut Day (September
13th), Spooktacular (October 24th), Winterfest (December 5th) – staffing and back-up staffing already determined and
scheduled
7. Future Agenda Items and Announcements
A. 2027 Budget (Action)
B. Legislative outreach
Next Meeting - Thursday September 10th, 2026 at 5:00 pm. - proposed earlier meeting time at 3:30pm – McKay suggested,
unanimous at 6:15 pm
8. Adjournment Motion – Cotting/Kovacs – unanimous at 6:17pm
Respectfully submitted,
Michelle Nightoak
WLOO CATV Station Manager
AGENDA for September 10, 2026 CATV Board Meeting at 3:30 pm (note changed time)
The Solarium, 575 West Madison St. Waterloo, WI
1. Call to Order and Roll Call
2. Approval of Previously Unapproved Meeting Minutes from August 13th, 2026
3. Citizen Input
4. Manager’s report: In Packet
5. Closed Session
[NOTE: The Cable Television Regulatory Board may meet in closed session per Wis. Stat. 19.85(1)(c)
considering employment, promotion, compensation or performance evaluation data of any public employee
over which the governmental body has jurisdiction or exercise responsibility. Upon concluding a closed
session, the Board will reconvene in open session.]
6. New Business
A. WLOO outreach and branding (Informational)
B. Revenue options (Informational and Discussion)
C. WLOO Board Chair replacement (Informational and Discussion)
7. Unfinished Business
A. Wiener and Kraut Day (Discussion)
B. 2027 Budget (Action)
C. Legislative outreach (Informational)
D. Historical Society (Informational)
E. Upcoming WLOO CATV Events (Informational) - Wiener and Kraut Day (September 13th)
7. Future Agenda Items and Announcements
A. Legislative outreach
B. Board Chair search
Next Meeting, Thursday October 8th, 2026 at 5:00 pm.
8. Adjournment Motion
Michelle Nightoak
WLOO CATV Station Manager
WLOO CATV Monthly Manager ’s Report
for mid-August to mid-September 2026
The City Treasurer's Monthly Report for July is not currently available. Manager Nightoak still needs training
in how to run this report herself. Her meeting with Mayor Quimby, scheduled for September 3rd, was postponed
due to illness.
PROJECTS
The potential collaboration with the Waterloo Area Historical Society is partially arranged. Storage of
archival materials will be finalized between Director Sparks and President Van Holten
The archival project is still on hold due to personnel costs; additional discussion is needed after archival
materials are moved to the Historical Society building.
Wiener & Kraut Day will be on September 13th.
o As of the time of this packet, no final information has been received on the location of WLOO’s
booth or other details for the event beyond set-up and staffing time.
o Manager Nightoak ordered supplies and Director Sparks arranged for the interactive options at
the booth.
PRODUCTION
Director Sparks has been working with other staff to complete the post-production work for Fill the
Squad.
OTHER
Board Chair Cotting resigned. Multiple potential candidates for a replacement Board Chair were
contacted by WLOO staff and Board members. None of those people can commit to serving at this time.
Two WLOO staff members are jointly designing a new possible logo for WLOO.
Regional
Prosperity Hub
Addressing Complex Challenges Together
Current State
Several factors make this moment important:
Regional economic momentum
Opportunity for regional alignment and
partnership
Clear housing, workforce and community health
challenges
Staffing capacity and financial sustainability risks
Proven national models for regional collaboration
The Opportunity: Regional Prosperity Hub
Partnering with the Greater Watertown Community Health
Foundation; a backbone organization that sharpens focus
on top priorities, aligns people and resources through
collaboration and ensures disciplined, data-driven action
to achieve real results.
Regional Challenges Call For Regional Solutions
The issues shaping our future do not stop at municipal or county lines:
Housing shortages
Workforce participation and availability
Leadership capacity and development
Community competitiveness
Business competitiveness
Household financial stability
Declining youth wellbeing and future-readiness
No single organization or community can solve these alone
Building On What Already Works
Greater Watertown Community
Health Foundation
Thrive Economic Development
Proven record of business attraction and
retention expertise
Productive industry relationships (utilities,
economic development orgs, federal agencies)
Trusted partner to site selectors and
developers
Strong working relationship with municipalities
Established subject matter experts on housing
Proven convener
Proven force multiplier and convener
Ability to quickly deploy resources
Strong working relationships in philanthropic
sector
WHAT THIS MEANS FOR OUR PARTNERSWhat Will Change What Will Not Change
Increased financial stability
Through increased Foundation support, ThriveED will gain greater staffing,
infrastructure and resources.
ThriveED remains a separate nonprofit
The proposal is not a merger or takeover.
Expanded staff capacity
Municipalities would have access to more specialized expertise and support.
ThriveED’s Board retains authority
The Board would continue to govern strategy and priorities.
Foundation-employed staff
The Foundation would serve as employer of record and provide HR, payroll,
benefits.
Municipal participation remains essential
Foundation support would complement, not replace, local involvement.
Shared operational support
Accounting, technology, administrative assistance and other internal functions
strengthened.
Local priorities still guide the work
Communities would continue to shape programs and initiatives.
Updated committee structure
A new Public Sector Committee will create a forum for municipal input.
Core services continue
Business retention, attraction, expansion and community development remain
central.
A broader regional service model
Upon approval, ThriveED’s work would expand from its current Jefferson
County-centered structure toward a regional model serving Jefferson and Dodge
counties. The intent is to create greater capacity, expertise and influence while
continuing to provide community-level economic development support.
Existing resources will not be redirected elsewhere
The purpose of adding regional capacity is to expand the total resources
available, not to shift existing Jefferson County service to another county.
Expectations for each participating county and municipality will be clearly
defined.
The goal is to change how ThriveED is supported, not why ThriveED exists
What This Means for our Partners
Organizational Chart: ThriveED
Staffing Structure
ThriveED Letter of Support
“This proposal is intended to continue and strengthen the public-private
partnership model that has been highly regarded and central to ThriveED’s success
over the past decade. The collaboration among municipalities, Jefferson County,
private investors and economic development professionals has created shared
ownership, credibility and results. A partnership with the Foundation would add
capacity and stability to that existing model, not replace it with a different one. ”
- ThriveED Board of Directors
• Counties continue to participate at $1.50 per resident.
• Municipalities participate at a reduced rate of $1.00 per resident.
• Shift to a Fee-for-Service Model for nontraditional services.
Service Matrix
Fee for Service Options (not inclusive):
• Custom data / analysis projects
• Custom community marketing
• Custom communications
• Custom presentations / workshops
• Custom program design / implementation contracts
• Project based funding support
• Project based due diligence management (shovel ready)
• Proactive outreach & promotion
• Community specific or project specific familiarization tours
• Targeted business retention / expansion visits
• Grant writing / reporting
Service Matrix
• ThriveED & JCEDC Board Approval (Go / No-Go)
• Municipal resolution
• Formal dissolution of JCEDC
• New governance model
Decision Points
Timeline and Next Steps
After July 21 Board
meeting
Circulate Documentation & Collect Feedback
Municipal Board Presentations (if requested)
Municipal & County Board Authorizations
August 27 JCEDC/ThriveED Board Meeting – Check-In
September JCEDC/ThriveED Board Meeting – Decision
October - December Transition to Foundation
Questions?
136 North Monroe Street
Waterloo, Wisconsin 53594-1198
Phone (920) 478-3025
Fax (920) 478-2021
____________________________________________________________________________________
RESOLUTION #2026-44
CREATION OF INFRASTRUCTURE RESERVE FUND
The Common Council of the City of Waterloo, Wisconsin does hereby ordain as follows:
WHEREAS, the City of Waterloo, Wisconsin ("City") recognizes that maintaining and improving public
infrastructure is essential to the health, safety, economic vitality, and quality of life of the community; and
WHEREAS, the City is responsible for planning, maintaining, repairing, replacing, and improving public
infrastructure, including but not limited to streets, sidewalks, stormwater facilities, bridges, public buildings, parks
and recreational facilities, public safety facilities, and other municipal infrastructure; and
WHEREAS, infrastructure projects often require significant financial resources and long-term planning, and
establishing dedicated reserves will assist the City in reducing reliance on short-term borrowing, minimizing future
tax impacts, and providing greater financial stability and predictability for major capital projects; and
WHEREAS, the City currently maintains a General Fund balance policy intended to preserve adequate working
capital and provide resources for unforeseen circumstances; and
WHEREAS, the City desires to establish a separate and dedicated Infrastructure Reserve Fund to receive eligible
excess General Fund balances after the City's required General Fund reserves and other financial obligations
have been satisfied; and
WHEREAS, the establishment of an Infrastructure Reserve Fund will allow the City Council to dedicate surplus
funds to future infrastructure needs while maintaining appropriate operating reserves within the General Fund;
and
WHEREAS, the City Council finds that the establishment of such a reserve is in the best financial interests of the
City and its residents.
THEREFORE, BE IT RESOLVED, by the Common Council of the City of Waterloo, Wisconsin, as follows:
Section 1. Establishment of Infrastructure Reserve Fund
There is hereby established a dedicated Infrastructure Reserve Fund of the City of Waterloo, Wisconsin, which
shall be maintained as a separate municipal fund or assigned reserve account as determined appropriate by the
City Treasurer-Deputy Clerk and consistent with generally accepted governmental accounting practices and
applicable Wisconsin law.
The fund shall be designated for the purpose of accumulating resources for significant, long-term infrastructure
projects and capital improvements.
Section 2. Purpose of the Fund
The Infrastructure Reserve Fund may be used for the planning, design, engineering, acquisition, construction,
reconstruction, replacement, rehabilitation, repair, or major maintenance of City infrastructure, including but not
limited to:
Streets and roadways;
Bridges and culverts;
Sidewalks, trails, and pedestrian facilities;
Stormwater and drainage infrastructure;
Municipal buildings and facilities;
Public safety facilities and related infrastructure;
Parks and recreational infrastructure;
Major equipment or infrastructure systems necessary to support municipal operations; and
Other significant capital infrastructure projects approved by the Common Council.
Routine operating expenses shall not be charged to the Infrastructure Reserve Fund unless specifically
authorized by the Common Council as part of an eligible infrastructure project.
Section 3. Funding of the Infrastructure Reserve Fund
Beginning with the City's annual financial review, the City Treasurer-Deputy Clerk shall determine the amount of
General Fund balance available for potential transfer after accounting for:
The City's adopted General Fund fund-balance policy;
Required working capital;
Outstanding obligations and encumbrances;
Budgetary requirements;
Unanticipated or emergency expenditures;
Other legally restricted or committed funds; and
Other financial obligations of the City.
To the extent that the General Fund balance exceeds the City's established target reserve level, the City Council
may transfer all or a portion of the eligible excess amount to the Infrastructure Reserve Fund by resolution or
other appropriate Council action.
No transfer shall reduce the General Fund below the minimum reserve level established by City policy unless
specifically authorized by the Common Council.
Section 4. Annual Review and Potential Transfer
The City Treasurer-Deputy Clerk shall review the General Fund balance following the close of each fiscal year
and provide a report to the Finance Committee and Common Council identifying:
1. The total General Fund balance;
2. The amount designated or reserved for operating purposes;
3. The amount available above the City's target General Fund reserve level;
4. The recommended amount, if any, available for transfer to the Infrastructure Reserve Fund; and
5. The current balance and anticipated uses of the Infrastructure Reserve Fund.
Any transfer to the Infrastructure Reserve Fund shall require approval by the Common Council.
Section 5. Use of Infrastructure Reserve Funds
Expenditures from the Infrastructure Reserve Fund shall require approval of the Common Council and shall be
limited to eligible infrastructure or capital purposes identified in this Resolution.
The Common Council may authorize the use of funds for a specific project through the annual budget process, a
budget amendment, resolution, or other action permitted by applicable law.
Section 6. Relationship to Capital Improvement Planning
The Infrastructure Reserve Fund shall be incorporated into the City's long-range capital improvement planning
process.
When preparing or updating the City's Capital Improvement Plan, City staff shall identify anticipated infrastructure
projects and may identify the Infrastructure Reserve Fund as a potential funding source.
The existence of funds in the Infrastructure Reserve Fund shall not obligate the City to undertake any particular
project.
Section 7. Investment of Funds
Funds held in the Infrastructure Reserve Fund shall be invested in accordance with the City's investment policies
and applicable Wisconsin law.
Any interest or investment earnings attributable to the Infrastructure Reserve Fund shall remain in the fund unless
otherwise directed by the Common Council.
Section 8. Separate Accounting
The City Treasurer-Deputy Clerk shall maintain appropriate accounting records identifying all revenues, transfers,
expenditures, commitments, and balances associated with the Infrastructure Reserve Fund.
The Infrastructure Reserve Fund shall be reported separately or otherwise clearly identified in the City's financial
records and annual financial reporting.
Section 9. No Automatic Expenditure Authority
Establishment of the Infrastructure Reserve Fund does not constitute authorization to spend the funds contained
therein.
All expenditures shall remain subject to the City's annual budget, applicable budget amendments, purchasing
requirements, and approval requirements established by Wisconsin law and City ordinance or policy.
Section 10. Review of Policy
The Common Council shall review the Infrastructure Reserve Fund policy periodically, and at least every five
years, to determine whether the funding mechanism, reserve target, eligible uses, and transfer procedures remain
appropriate for the City's financial condition and infrastructure needs.
Section 11. Effective Date
This Resolution shall take effect immediately upon its adoption by the Common Council of the City of Waterloo,
Wisconsin.
PASSES AND ADOPTED this 17th day of September 2026
City of Waterloo
Signed: ______________________________________
Jenifer Quimby, Mayor
Attest: _________________________________
Charles Kuhl, Council President
Sponsor(s): Finance, Insurance, & Personnel
Ordinance Reference: #2026-10 / 53-11 C & D
136 North Monroe Street
Waterloo, Wisconsin 53594-1198
Phone (920) 478-3025
Fax (920) 478-2021
____________________________________________________________________________________
RESOLUTION #2026-45
EXCESS GENERAL FUND BALANCE INTO THE INFRASTRUCTURE RESERVE
The Common Council of the City of Waterloo, Wisconsin does hereby ordain as follows:
WHEREAS, the City of Waterloo has a formal adopted policy to maintain a working capital general fund
balance between 25% - 33% of the general fund budget; and
WHEREAS, the City of Waterloo general fund balance may increase annually due to unexpected or
increased revenue, reduced or limited spending, or gains from return of investments; and
WHEREAS, the City of Waterloo conducts an annual independent audit of the City’s fiscal health; and
WHEREAS, the City of Waterloo must financially prepare for the replacement and maintenance of
infrastructure related costs within the City; and
WHEREAS, the City of Waterloo has created an infrastructure Reserve Fund Account to be used for
infrastructure related costs:
THEREFORE, BE IT RESOLVED, by the City of Waterloo Common Council, that after the completion of
the annual audit, the City of Waterloo shall designate any excess of the general fund balance above the
33%, to be transferred into the Infrastructure Reserve Fund Account and used consistent with the
resolution creating that account.
PASSES AND ADOPTED this 17th day of September 2026
City of Waterloo
Signed: ______________________________________
Jenifer Quimby, Mayor
Attest: _________________________________
Charles Kuhl, Council President
Sponsor(s): Finance, Insurance, & Personnel
Ordinance Reference: #2026-09 / 53-12 C (1)
136 North Monroe Street
Waterloo, WI 53594
Phone: (920) 478-3025
Fax: (920) 478-2021
www.waterloowi.us
____________________________________________________________________________ _______
ORDINANCE #2026-09
AN ORDINANCE UPDATING FUND DEBT POLICY
53-12 C (1)
C. The City of Waterloo will strive to maintain a balance relationship for financing its capital improvements
through annual tax levy for street reconstruction and equipment purchases. through utilization of current
revenues and issuance of long-term debt. The City recognizes that access to capital markets over the long
term is dependent upon the City’s commitment to full and timely repayment of debt.
(1) General guidelines:
(a) The City may issue bonds and notes for purposes of financing its capital improvements, to
refund existing debt, or on an emergency basis as approved by the City Council. Capital
improvements include projects to acquire, plan, design, construct, improve and equip all or any
part of the City’s facilities, systems or departments, promote economic development or to
secure quality of life improvements.
(a) (b)The City of Waterloo shall assess the fiscal impact of the debt prior to issuance.
(b) (c) Total general obligation debt for the City of Waterloo should not exceed 3.75% of TID-
Out equalized valuation. General obligation debt shall not exceed Wisconsin State statute limits
of 5 percent (5%) of equalized valuation. The City should maintain at least 25 percent (25%) of
its statutory general obligation debt capacity available at all times, which may be used only in
the event of an emergency, as determined by the City Council.
(c) Total annual debt service payments on tax supported debt, excluding tax increment
finance debt, of the City of Waterloo will not exceed 15% of total general government operating revenues.
(d) The City shall not incur debt obligations which have variable interest rates, negative
amortization, or other risky attributes.
(e) All tax supported debt obligations shall have a maximum maturity of the earlier of: (i) the
estimated useful life of the capital improvements being financed; (ii) twenty years; or (iii) in the
event they are being issued to refinancing outstanding debt obligation, the final maturity of the
debt obligations being refinanced unless a longer term is recommended by the Finance
Committee.
Adopted at the Organizational meeting of the Common Council on 17th of September, 2026.
CITY OF WATERLOO
___________________________________
Jenifer Quimby, Mayor
Attest: _________________________________
Denise Knutson, Interim City Clerk/Treasurer
Date Adopted: _____________________
Date Published: ____________________
Resolution #2026-45
136 North Monroe Street
Waterloo, Wisconsin 53594-1198
Phone (920) 478-3025
Fax (920) 478-2021
www.waterloowi.us
____________________________________________________________________________________
RESOLUTION # 2026 - 50
A Resolution Authorizing Acceptance and Posting of a Request for Proposals (RFP) for
Professional Planning Services to Update the City of Waterloo Comprehensive Plan and Zoning
Ordinance
The Common Council of the City of Waterloo, Wisconsin, does hereby ordain as follows:
WHEREAS, the City of Waterloo recognizes the importance of maintaining an up-to-date Comprehensive
Plan and Zoning Ordinance in accordance with Wisconsin Statutes §66.1001; and
WHEREAS, the City of Waterloo has prepared a Request for Proposals (RFP) seeking qualified
professional planning consultants to assist in updating the Comprehensive Plan and Zoning Ordinance;
and
WHEREAS, the City Council desires to formally authorize acceptance of proposals submitted in response
to the RFP; and
WHEREAS,., the City also must make the RFP publicly available so that all qualified firms may access and
respond to it.
THEREFORE, BE IT RESOLVED, the City Council of the City of Waterloo, Wisconsin, hereby approves
and authorizes the issuance, posting, and acceptance of the Request for Proposals for professional
planning services relating to the update of the City’s Comprehensive Plan and Zoning Ordinance.
BE IT FURTHER RESOLVED , that City staff, along with designated members of the Council or Plan
Commission, are authorized to post the RFP on official City platforms, distribute it to interested parties,
receive submitted proposals, evaluate submissions, and provide a recommendation to the Common
Council for consultant selection.
PASSES AND ADOPTED this 17th day of September 2026
City of Waterloo
Signed: ______________________________________
Jenifer Quimby, Mayor
Attest: _________________________________
Charles Kuhl, Council President
Sponsor(s): Finance, Insurance, & Personnel
City of Waterloo, Wisconsin
Request for Proposals (RFP)
Comprehensive Plan Update and Zoning Ordinance Modernization
1. Introduction
The City of Waterloo, Wisconsin is soliciting proposals from qualified planning consultants
or multidisciplinary teams to prepare an updated Comprehensive Plan compliant
with Wisconsin Statutes §66.1001 and, optionally, a zoning ordinance modernization.
The City seeks a modern, data-driven, and highly usable planning framework that reflects
current market conditions, community priorities, and best practices in zoning and land use
regulation. This RFP emphasizes strong public engagement, clear implementation
strategies, and high-quality graphic communication.
2. Project Objectives and Priorities
2.1 Comprehensive Plan Objectives
The consultant shall prepare a Comprehensive Plan that:
Complies fully with Wisconsin Statutes §66.1001
Updates demographic, housing, economic, and land use data, forecasts, and
growth assumptions
Identifies future residential, commercial, industrial, and business park growth areas
Aligns land use, transportation, utilities, and economic development strategies
Engages the community through a meaningful, transparent, and inclusive public
process
Produces a practical, action-oriented implementation framework suitable for
ongoing City use
2.2 Zoning and Ordinance Coordination
If selected, the consultant may also prepare a zoning ordinance modernization
strategy that:
Aligns zoning regulations with the adopted Comprehensive Plan
Improves predictability and clarity for applicants and staff
Reduces administrative burden
Reflects current technology, market conditions, and Wisconsin planning law
Incorporates graphic-rich and user-friendly standards
3. Scope of Work – Comprehensive Plan
At a minimum, the consultant shall complete the following tasks:
3.1 Project Initiation and Existing Conditions Review
Project kickoff meeting with City staff
Review of existing plans, ordinances, policies, and relevant datasets
Compilation and assessment of baseline demographic, economic, housing, and
land use data
3.2 Public Engagement
The City expects an engagement process, which may include:
Community surveys (digital and/or paper)
Public workshops and open houses
Interactive online tools
Stakeholder and focus group meetings
Engagement with boards, commissions, and partner agencies
3.3 Statutory Plan Elements
Preparation of all nine required Comprehensive Plan elements, including:
1. Issues and Opportunities
2. Housing
3. Transportation
4. Utilities and Community Facilities
5. Agricultural, Natural, and Cultural Resources
6. Economic Development
7. Intergovernmental Cooperation
8. Land Use
9. Implementation
3.4 Technical Analyses
Housing analysis, including housing gaps, affordability, and future needs
Economic Development analysis, including employment trends and market
conditions
Land Use analysis, including:
Existing land use inventory
Demand projections
Growth phasing and development capacity
Intergovernmental Cooperation assessment
3.5 Drafting and Adoption Support
Preparation of draft plan materials
Refinement based on public and staff input
Support for Plan Commission and Common Council review
Assistance through final adoption
4. Zoning and Ordinance Review
If included, zoning-related work may consist of:
Diagnostic review of existing zoning and development regulations
Identification of inconsistencies with the Comprehensive Plan
Development of zoning concepts, code outlines, and implementation strategies
Preparation of graphic-rich ordinance language
Stakeholder presentations and public review
Legal coordination to ensure statutory compliance
Assistance with adoption hearings and presentations
5. Schedule
The consultant shall propose a detailed project schedule. The City anticipates completion
of the Comprehensive Plan within XXX months, depending on scope and engagement
approach.
6. Mapping and Graphic Standards
Both the Comprehensive Plan and any optional zoning components shall include:
Professionally produced maps, figures, and graphics
Materials suitable for print and digital use
GIS-compatible datasets
Clear, accessible visual communication for public and decision-makers
7. Implementation Strategy
Each plan shall include a dedicated Implementation Chapter, organized as an action
matrix that identifies:
Specific actions
Responsible parties
Timeframes (short-, mid-, and long-term)
Potential funding sources
Priority ranking where appropriate
8. Deliverables
At a minimum, deliverables shall include:
Draft and Final Comprehensive Plan
Optional Draft and Final zoning materials (if selected)
Executive summaries
Public participation documentation
GIS datasets, shapefiles, and editable map files
Editable tables, figures, and graphics
Digital and print-ready formats
All work products shall become the property of the City of Waterloo.
9. Consultant Qualifications
Proposals must demonstrate:
Experience preparing high-quality Comprehensive Plans of similar scale and
complexity
Demonstrated GIS, data analysis, and graphic design capability (in-house or through
partners)
Ability to manage and document robust public engagement processes
Knowledge of Wisconsin planning law and local government operations
Experience coordinating planning and zoning projects is preferred
10. Proposal Submission Requirements
Proposals shall include:
1. Project understanding and approach
2. Proposed scope, schedule, and public engagement strategy
3. Consultant team and roles
4. Relevant example work
5. References
6. Cost proposal (clearly itemized)
11. Evaluation and Scoring
Proposals will be evaluated using the following criteria:
Cost – 60%
Qualifications and Experience – 20%
Community Engagement Plan – 20%
The City reserves the right to reject any or all proposals and is not obligated to select the
lowest-cost proposal.
136 North Monroe Street
Waterloo, Wisconsin 53594-1198
Phone (920) 478-3025
Fax (920) 478-2021
www.waterloowi.us
_________________________________________________________________________________________
RESOLUTION # 2026 – 51
RESOLUTION AUTHORIZING THE USE OF CONTINGENCY FUNDS FOR CITY HALL THERMOSTAT AND
DUCT WORK REPLACEMENT
WHEREAS, the City of Waterloo, Wisconsin has identified the need to replace thermostats and perform
necessary duct work at Waterloo City Hall; and
WHEREAS, Jensen's Plumbing, Heating, and Air, Inc. has provided a proposal to complete the necessary
thermostat and duct work replacement at City Hall in the amount of $5,105.00; and
WHEREAS, the City Council finds that completing this work is necessary to maintain the proper operation,
efficiency, and functionality of the City Hall heating and cooling systems; and
WHEREAS, sufficient funds are available within the City's Contingency Fund to cover the
cost of the proposed work; and
WHEREAS, the City Council desires to authorize the use of contingency funds for this necessary City Hall
improvement.
NOW, THEREFORE, BE IT RESOLVED, by the Common Council of the City of Waterloo, Wisconsin, that the
City is hereby authorized to use funds from the City's Contingency Fund for the replacement of thermostats
and necessary duct work at City Hall by Jensen's Plumbing, Heating, and Air, Inc.
BE IT FURTHER RESOLVED, that the total expenditure authorized under this resolution shall not exceed
$5,105.00. Any additional work or expenditure exceeding $5,105.00 shall require separate approval by the
Common Council.
BE IT FURTHER RESOLVED, that the appropriate City officials are authorized to execute any documents and
take any actions necessary to carry out the work authorized by this resolution.
PASSES AND ADOPTED this 17th day of September 2026
City of Waterloo
Signed: ______________________________________
Jenifer Quimby, Mayor
Attest: _________________________________
Charles Kuhl, Council President
Sponsor(s): Finance, Insurance, & Personnel
204 W Lake St ,Lake Mills WI 53551
(920) 648-8373 Providing 24/7 Reliable Quality Service
PROPOSAL
PROPOSAL # 1095232189
DATE 09/10/2026
PROPOSAL CREATED BY KENNY
KENNY@JENSENPH.COM
SERVICE LOCATION
CITY OF WATERLOO
136 N Monroe St
Waterloo, Wisconsin, 53594-1125
(920) 941-8231
(920) 478-9797, (920) 478-3025
invoices@waterloowi.us
CUSTOMER
CITY OF WATERLOO
Chad Yerges
136 N Monroe St
Waterloo, Wisconsin, 53594-1125
(920) 941-8231
(920) 478-9797, (920) 478-3025
invoices@waterloowi.us
PAYMENT
TERMS
50% DOWNPAYMENT,
REMAINDER OF BALANCE DUE
UPON COMPLETION OF WORK
EXPIRATION PROPOSAL PRICING IS GOOD FOR 14
DAYS FROM 08/20/2026
Please
note:
3% SURCHARGE TO BE ADDED IF USING CARD OR FINANCING
Due to unpredictable market conditions and potential impacts from tariffs, this
estimate is valid for 14 days from the date issued.
1
ZONING OPTION
Description
ZONING
Installation of zone control & dampers to separate the chambers from the office area. Any sheet metal alterations needed will be fabricated.
A new ECO-BEE thermostat will be installed in the office. The existing thermostat in the chambers will stay. After completion the system will
be properly tested.
CUSTOMER MESSAGE
Thank you for having us out.
3% to be added if using card or financing
Signed proposal and down payment are required to schedule.
We offer financing please go to jensenpha.com to learn more.
Estimate Total: $5,105.00
2
Terms and Conditions
1. Permits and Compliance: The required permits for the project are set forth in the “Description” section of this Proposal. Customer is responsible
for obtaining all necessary permits and paying all associated fees and costs, unless otherwise stated in the Description. The project will not begin until all
necessary permits have been obtained and proof of the required permits have been provided to Jensen Plumbing, Heating & Air, Inc. (“Jensen”).
2. Project Timeline: Jensen will consider Jensen’s and the customer’s schedules when determining a project start date but will use its best efforts to
begin the project within ninety (90) days after customer provides it with the downpayment and proof of the required permits. Jensen will complete the
project as soon as possible but no later than one year from the date of acceptance by the customer of this proposal (“Acceptance Date”). Upon acceptance
by the customer, the proposal becomes an enforceable agreement. If the project is not completed within one year of the Acceptance Date due to
customer delays, Jensen will charge the customer a 2% monthly fee based on the “Balance Due” amount to be paid upon completion of the project for the
storage of products held.
3. Material Selection: Materials used in the project will be specified in this proposal and, if not specified, the assigned technician will select the
materials to be used.
4. Special Order Items: Special order items are non-refundable and non-returnable. The customer is responsible for full payment of these items at the
time of the Acceptance Date. If the project is canceled, the customer will need to pick-up the special-order item within 15 business days, or Jensen will
dispose of it.
5. Scope of Work and Change Orders: The scope of work is set forth as detailed in this proposal. Any additional work requested by the customer
outside the scope of work will be set forth in a written change order signed by the customer, and the change order shall list the additional work, materials,
and corresponding charges.
6. Downpayment: Customer shall pay to Jensen the down payment according to the payment terms as described in this proposal. Jensen will not
order materials or schedule work until the downpayment amount is paid. Customers may choose to pay more than required downpayment of the proposal
amount at their discretion. The remaining balance is due upon completion of the work, unless otherwise specified in writing. If, upon customer request, the
project is delayed beyond 120 days after the proposed start date, payment terms will convert to progressive billing, requiring payments as work
progresses.
7. Overdue Payments and Enforcement: All outstanding payments are due at project completion, unless otherwise specified in the proposal or an
invoice. All overdue balances will incur monthly interest at the rate of 1.5%. In the event Jensen retains legal counsel to enforce the terms and conditions
of the accepted proposal, customer shall reimburse Jensen for the actual attorneys’ fees and costs incurred in pursuing such enforcement.
8. Price Validity: Due to fluctuations in the prices of materials and other market conditions, all pricing outlined in this proposal is valid for fourteen (14)
days after the proposal date. If the signed proposal and downpayment are not received by Jensen within the 14-day period, this proposal is deemed void.
9. Restocking Fee: A 30% restocking fee applies to cancellations of non-special order materials if customer cancels 30 days after the Acceptance
Date.
10. Customer-Supplied Materials: Materials provided by the customer or third parties are not covered under Jensen's warranty.
11. Lien Rights: Customer may request lien waivers from Jensen at, or prior to, the time any payment is made under this proposal. As required by the
Wisconsin construction lien law, claimant hereby notifies owner that persons or companies performing, furnishing, or procuring labor, services, materials,
plans, or specifications for the onstruction on owner’s land may have lien rights on owner’s land and buildings if not paid. Those entitled to lien rights, in
addition to the undersigned claimant, are those who contract directly with the owner or those who give the owner notice within 60 days after they first
perform, furnish, or procure labor, services, materials, plans or pecifications for the construction. Accordingly, owner probably will receive notices from
those who perform, furnish, or procure labor, services, materials, plans, or specifications for the construction, and should give a copy of each notice
received to the mortgage lender, if any. Claimant agrees to cooperate with the owner and the owner’s lender, if any, to see that all potential lien claimants
are duly paid.
12. Workmanship Guarantee: Jensen guarantees that all work performed will be in a workmanlike manner.
13. Business Hours: All work will be conducted during regular business hours of 7 AM to 4 PM, Monday through Friday (excluding observed Holidays).
Additional charges may apply for work performed outside these hours.
14. Delays: Jensen is not liable for delays caused by events beyond its control, including strikes, natural disasters, supply chain issues, and supply
shortages.
15. Insurance: The customer is responsible for maintaining appropriate insurance coverage for their property during the project.
16. Time and Material Rate: Time and Material hourly rate is $192, per technician plus any materials used. (Time and Material rates are subject to
change without notice) (Example: If concrete is over 4 inches thick or contains re-bar or wire mesh, removal will be billed on a time and material basis.)
17. Right to Cancel: JENSEN PLUMBING HEATING AND AIR, INC. RESERVES THE RIGHT TO CANCEL THIS PROPOSAL AT ANYTIME PRIOR TO RECEIPT OF
THE ACCEPTED PROPOSAL.
18. Warranty Limitations and Required Maintenance: All equipment warranties are provided solely by the manufacturer and are subject to
manufacturer terms and maintenance requirements. Jensen does not extend or modify manufacturer warranties.
19. Non-Warranty Repairs: Repairs, service calls, parts, labor, or equipment damage resulting from freezing conditions, lack of maintenance, improper
maintenance, misuse, neglect, or conditions beyond Jensen’s control are excluded from warranty coverage and billed at Jensen’s then current time and
material rates.
20. Freeze Damage and Neglect Exclusion: Damage resulting from freezing conditions, lack of heat, power outages, improper winterization, failure to
perform required maintenance, or customer neglect is not covered under the workmanship guarantee or manufacturer warranties. Customer is responsible
for proper operation, required maintenance, maintaining adequate heat, and proper winterization at all times, including during periods of vacancy or
power interruption.
21. Access and Site Conditions: Customer shall provide safe, unobstructed access to all work areas. Jensen is not responsible for delays, additional
charges, or damages resulting from unsafe, restricted, or undisclosed site conditions, including pets, hazardous materials, confined spaces, or structural
deficiencies.
22. Duty to Mitigate Damages: Customer agrees to take reasonable steps to mitigate damage, including shutting off water, power, or fuel supplies
and promptly notifying Jensen of system failures or similar problems. Failure to mitigate may result in denial of warranty coverage or additional charges to
customer.
3
ACCEPTANCE OF PROPOSAL
SIGNATURE :
DATE:
4
136 North Monroe Street
Waterloo, Wisconsin 53594-1198
Phone (920) 478-3025
Fax (920) 478-2021
www.waterloowi.us
__________________________________________________________________________________________
RESOLUTION # 2026 – 52
A RESOLUTION APPROVING A DEVELOPMENT AGREEMENT WITH DRUMLIN FIELDS WATERLOO, LLC, AS TO
FORM, AND AUTHORIZING EXECUTION THEREOF
WHEREAS, Drumlin Fields Waterloo LLC (the “Developer”) plans to develop a 6.7-acre parcel, Parcel Identification No.
290-0813-0611-006 (the “Development Parcel”), as a 96-unit apartment community (the “Development”);
WHEREAS, all of the Development Parcel is located in Tax Incremental District No. 5;
WHEREAS, in accordance with Wis. Stat. § 66.1105 and the Project Plan for Tax Incremental District No. 5, the City may
provide certain development incentives to the Developer for the Development;
WHEREAS, the City finds that but for the provisions of development incentives to the Developer, the Development would
not be constructed;
WHEREAS, the City and the Developer have negotiated a Development Agreement, which articulates the scope of the
Development, the public improvements necessary for the Development, and the development incentives available to the
Developer through the generation of tax increment by the Development;
WHEREAS, the Common Council has reviewed the Development Agreement and has determined it is consistent with the
Project Plan for the Tax Incremental District No. 5, will result in additional housing units in the City, and is in the best
interests of the City;
NOW, THEREFORE, BE IT RESOLVED, by the Common Council of the City of Waterloo, resolves as follows:
1. The Common Council approves the Development Agreement with the Developer for the Development as to form. The
Development Agreement is attached hereto as Exhibit A and incorporated into this Resolution by reference.
2. The Mayor and City Clerk are authorized to execute this Development Agreement on behalf of the City, upon the insert
of any necessary plans, specifications, and engineering documents for the Development and the public improvements
thereto, after those plans, specifications, and engineering documents are approved by the City Engineer.
3. The Common Council specifically authorizes the Developer to advise any third-party lender that the Development
Agreement attached to this Resolution is approved by the City as to form and will be executed by the Mayor and City
Clerk on the City’s behalf upon administrative approval and incorporation of any necessary plans, specifications, and
engineering documents for the Development or related public improvements.
PASSES AND ADOPTED this 17th day of September 2026
City of Waterloo
Signed: ______________________________________
Jenifer Quimby, Mayor
Attest: _________________________________
Charles Kuhl, Council President
Sponsor(s): Finance, Insurance, & Personnel
Incorporated by Reference:
Exhibit A - Development Agreement between Drumlin Fields Waterloo LLC and the City of Waterloo
Page 1 of 22
DEVELOPMENT AGREEMENT
THIS DEVELOPMENT AGREEMENT (the “Agreement”) is entered into as of the last date of signature
below (the “Effective Date”), by and between the City of Waterloo, a Wisconsin municipal corporation
(the “City”), and Drumlin Fields Waterloo LLC, a Wisconsin limited liability company (the “Developer”).
RECITALS
WHEREAS, the Developer owns real property legally described and depicted in the attached
Exhibit A (the “Development Parcel”) and proposes to develop the Development Parcel as generally
described in the attached Exhibit B (the “Development”); and
WHEREAS, the Development Parcel is located in the City’s Tax Incremental District No. 5 (the
“TID”), which the City has established to finance costs and provide development incentives within the
TID as permitted in accordance with the Wisconsin Tax Increment Law, section 66.1105 of the Wisconsin
Statutes, and the Project Plan for the TID; and
WHEREAS, the City finds it appropriate to provide financial assistance to Developer through
generation of new tax increment from the Development Parcel for the implementation of the
Development in accordance with this Agreement; and
WHEREAS, the City finds the Development and the fulfillment of the terms and conditions of this
Agreement are in the best interests of the City and its residents, by among other things expanding the tax
base and providing for the creation of new market-rate housing units in the City; and
WHEREAS, the City finds that but for the City’s provision of this financial assistance to the
Development, the Development would not occur; and
WHEREAS, the City requires a development agreement to facilitate development of the
Development.
AGREEMENT
NOW, THEREFORE, in consideration of the mutual covenants contained herein and other good and
valuable consideration, the receipt and sufficiency of which are hereby mutually acknowledged, the parties
agree as follows:
1. Development Requirements.
a. Development. The Developer shall, at its sole expense, construct and complete the
Development as set forth in Exhibit B . Notwithstanding any provision herein to the contrary, the
Development shall be constructed in accordance with all site plans, specifications and conditions as finally
approved by the City, which shall be incorporated and made a part of this Agreement as if set forth in full
herein.
b. Plan Commission Review. The Developer is advised and acknowledges that the
Development is subject to review by the City Common Council and Plan Commission which shall exercise
authority pursuant to section 62.23 and Chapter 66 of the Wisconsin Statutes and the City of Waterloo Code
of Ordinances. The obligations of the City under this Agreement are specifically conditioned upon the
Developer’s compliance with all requirements imposed by the Common Council and Plan Commission.
c. Guaranteed Value of Development. The Developer shall construct the Development so
that upon completion of the Development, the Development Parcel shall have an equalized value for
property tax purposes of at least Sixteen Million Two Hundred Seventy-Two Thousand and No/100 U.S.
Dollars ($16,272,000.00) (hereinafter referred to as the “Required Value”) and be fully completed no later
Page 2 of 22
than April 1, 2028 (hereinafter referred to as the “Completion Deadline”). The Development shall be
deemed completed upon issuance to the Developer by the City of an occupancy permit for all buildings
within the Development. Time is of the essence with respect to the Completion Deadline and the
Developer’s obligation to achieve the Required Value, subject to the force majeure provisions below.
d. Construction Schedule. No land disturbance or work on the Development Parcel shall
begin until such work is approved by the City Engineer and a building permit is issued for the Development
by the City. The Developer shall fulfill all requirements to apply for a building permit within one hundred
twenty (120) days after the Effective Date. The Developer shall commence construction of the
Development within forty-five (45) days after issuance to the Developer of a building permit for the
Development. Thereafter, the Developer shall diligently and continuously proceed with construction of the
Development in accordance with normal construction practices and in accordance with the plans and
specifications approved by the City, such that the Development shall be completed in a single phase by the
Completion Deadline.
e. Public Improvements. The Developer shall design, construct, and install all on-site and
off-site public improvements necessary to serve the Development, as identified in the site plan approved
by the City for the Development and in accordance with plans and specifications approved by the City (the
“Public Improvements”), as set forth on Exhibit E. All Public Improvements shall be completed no later
than the Completion Deadline. Any work which is not completed by the Completion Deadline may be
completed by the City at the City’s option and charged to the Developer, provided the City shall first give
Developer at least ten (10) days written notice and an opportunity to cure its failure to complete the Public
Improvements, or if such failure cannot be reasonably cured within said 10-day period then to commence
cure and complete cure within a reasonable time thereafter but not to exceed sixty (60) days , subject to
force majeure. In the event the Developer fails to pay all such charges within sixty (60) days, the City may
place the charges on the tax roll of the Development Parcel as a special charge in accordance with Wis.
Stats. § 66.0627. The Public Improvements shall be designed, constructed, and installed by the Developer
at the Developer's sole expense. The City shall not be responsible for any costs or charges relating to the
Development, the Public Improvements, or this Agreement , except those specifically enumerated and
agreed upon in this Agreement or subsequent written, signed agreements between the Developer and the
City. The Public Improvements shall be dedicated to the City upon completion.
f. Contractors Engaged by Developer. The Developer shall furnish the City Engineer with
the names of all known contractors and subcontractors performing work on the Development and Public
Improvements, with the classification of work they will perform, at or before a preconstruction meeting
between the Developer and the City, and shall update such information as construction progresses.
g. Public Protection and Safety. During construction of the Development and the Public
Improvements, the Developer shall be responsible for all damage, bodily injury, or death arising out of the
construction of the Public Improvements whether from maintaining an "attractive nuisance" or otherwise.
Where apparent or potential hazards occur incident to its conduct of construction and installation of Public
Improvements, the Developer shall provide reasonable safeguards. Construction and installation of Public
Improvements shall be under the charge and care of the Developer until all Public Improvements have been
accepted by the City. If prior to acceptance, the City is required to take any measure to maintain, protect,
or guard any completed Public Improvements that have not yet been accepted by the City, the costs of doing
so shall be billed to the Developer.
h. Personal Liability of Public Officials. In carrying out any of the provisions of this Agreement
or in exercising any power or authority granted to them thereby, there shall be no personal liability of the City's
officers, agents, or employees, except as otherwise provided by law, it being understood and agreed that in such
matters they act as agents and representatives of the City.
Page 3 of 22
2. Costs and Fees.
a. Developer to Reimburse City Administrative Costs. The Developer shall reimburse the
City for all City staff, engineering, legal, planning, inspection, and financial consultant costs incurred by
the City relating to the creation and continuing and future administration of the TID and this Agreement,
the drafting and negotiation of this Agreement and other agreements relating to the Development (the “City
Administrative Costs”). The City shall bill the Developer monthly for City Administrative Costs, except
as noted in Section 3.a.ii. Bills outstanding for more than thirty (30) days shall accrue interest at the rate
of 1 and 1/2 percent (1.5%) per month. The City may order the suspension of work on the Development if
bills are outstanding for more than sixty (60) days.
3. Development Assistance. In order to induce the Developer to undertake the Development on the
Development Parcel, the City shall provide to the Developer the following assistance pursuant to section
66.1105 of the Wisconsin Statutes.
a. Municipal Revenue Obligation. The City shall provide the Developer with a municipal
revenue obligation bond (hereinafter referred to as the “Municipal Revenue Obligation”). Upon completion
of the Public Improvements in accordance with the terms of this Agreement, an issuance of a certificate of
occupancy for all buildings of the Development, the Development Parcel being assessed by the City
Assessor at an assessed improvement value for property tax purposes greater than its improvement value
as of January 1, 2027, and within forty-five (45) days after Developer’s submittal of a written request to the
City for issuance of the Municipal Revenue Obligation, the City shall issue a Municipal Revenue Obligation
to the Developer as a development incentive. The Municipal Revenue Obligation shall be payable to
Developer in annual installments and solely from tax increment, as that term is defined in Wis. Stat. §
66.1105(2)(h)1, generated by the Development as determined by the City in accordance with Wis. Stat. §
66.1105, (hereinafter referred to as the “Excess Tax Increment”). The Municipal Revenue Obligation
shall be in the form incorporated herein as Exhibit C. The City’s obligations under this Section shall be
subject to the following terms and conditions:
i. The City has no obligation to provide a Municipal Revenue Obligation to
Developer unless the Developer has constructed no fewer than ninety-six (96) units of market-rate
housing, as described in Exhibit B of this Agreement.
ii. The Municipal Revenue Obligation shall provide for payments to the Developer
from the City in an amount equal to seventy-five percent (75%) of the Excess Tax Increment
received by the City for each year in which the Development generates Excess Tax Increment; and
the remaining twenty-five percent (25%) of the Excess Tax Increment shall be retained by the City.
The total cumulative Municipal Revenue Obligation provided by the City as a development
incentive to the Developer shall not exceed Two Million Four Hundred Seventy Thousand Seven
Hundred Ninety-Five and No/100 U.S. Dollars ($2,470,795.00). Once the City’s cumulative
twenty-five percent (25%) share of Excess Tax Increment generates an amount in excess of the
City Administrative Costs described in Section 2.a, the City Administrative Costs shall be deemed
reimbursed from that share of the Excess Tax Increment and the City will no longer bill the
Developer for reimbursement of the City’s Administrative Costs.
iii. Any payment on the Municipal Revenue Obligation shall be payable solely from
and only to the extent that the City has received, as of such Payment Date (as defined below) and
after the date of issuance of the Municipal Revenue Obligation, Excess Tax Increment. Any such
Excess Tax Increment shall be appropriated by the City Common Council to payment of the
Municipal Revenue Obligation until the earlier of full payment of the Municipal Revenue
Obligation or the date upon which the TID is required to terminate in accordance with the
Page 4 of 22
Wisconsin Tax Incremental Finance Law (section 66.1105, Wis. Stats.) (hereinafter referred to as
the “TID Closure Date”).
iv. For purposes of the Municipal Revenue Obligation, a “Payment Date” shall mean
November 1 of each year until the earlier of full payment of the Municipal Revenue Obligation or
November 1, 2040, which is the final scheduled Payment Date. On each Payment Date, the City
shall make a payment on the Municipal Revenue Obligation. In the event that there is no Excess
Tax Increment to make a Municipal Revenue Obligation payment to the Developer in any year, it
shall not be a default by the City. The City shall have no further obligations to make payments
hereunder or under the Municipal Revenue Obligations after the earlier of full payment of the
Municipal Revenue Obligation or November 1, 2040, which is the final scheduled Payment Date.
v. The City covenants and agrees that the portion of the Excess Tax Increment to be
paid to the Developer pursuant to section 3.a.ii. above and held by the City as of a given Payment
Date shall not be appropriated for any other use or purpose, if not appropriated for the Municipal
Revenue Obligation due as of such Payment Date. The City shall not take any unilateral action to
close the TID prior to the TID Closure Date unless the Municipal Revenue Obligation has been
paid in full to the Developer.
vi. The Developer’s lender may require the Developer to execute a collateral
assignment of this Agreement. Such assignment shall require the consent of the City, and the City’s
consent may not be unreasonably withheld, conditioned or delayed.
vii. Neither the Municipal Revenue Obligation nor the Excess Tax Increment shall be
used or applied, in whole or in part, to the payment or reimbursement of any real, personal or other
property taxes.
viii. The Municipal Revenue Obligation payments shall not be included in the
computation of the City’s constitutional debt limitation, because the Municipal Revenue Obligation
payments are limited and conditional, and no taxes have been or will be levied for its payment or
Excess Tax Increment or other taxes pledged to its payment. Nothing in this Agreement shall be
deemed to change the nature of City’s obligation from a limited and conditional obligation to a
general obligation.
ix. The City may withhold any disbursements at any time the Developer is not in
compliance with any of its obligations under this Agreement. Any amounts withheld by City shall
be paid to the Developer at such time as the Developer has come into full compliance with the
applicable obligation.
4. Developer Obligations. In addition to the other obligations set forth in this Agreement, the
Developer shall be subject to the following obligations:
a. Taxes. Upon obtaining possession of the Development Parcel, the Developer shall pay
when due, all federal, state and local taxes in connection with the Development Parcel. It is understood
that the land, improvements and personal property of the Development Parcel shall be subject to property
taxes.
b. Compliance with Laws and Codes. The Developer shall construct the Development such
that it will conform with all applicable laws, rules , regulations and ordinances, including, without
limitation, all building codes and ordinances of the City in effect as of the date of issuance of a certificate
of occupancy for the initial construction of the Development.
Page 5 of 22
c. Tax Status of the Development Parcel. The Development Parcel shall be subject to
property taxation and shall not be exempt from property taxation, in full or in part. The Developer shall
take all reasonable actions to assure that the Development Parcel shall not be exempt from property taxation,
in full or in part, except as required by law. The Developer shall not submit any request or application for
property tax exemption of the Development Parcel, in full or in part, challenge the status of the
Development Parcel as fully subject to property taxation, or seek any ruling by a court or any statutory
change that would entitle the Development Parcel to exemption, in full or in part. Nothing herein shall be
construed as preventing the Developer from challenging the Development Parcel’s assessed value, provided
the assessed value is equal to or greater than the Required Value. The Developer shall not knowingly sell,
transfer, or assign all or any part of its interest in the Development Parcel, or any portion thereof, to an
entity exempt from payment of property taxes under Wisconsin law. The obligations set forth in this Section
shall run with the land and be binding upon all successors and assigns, and remain in effect until the TID
expires or is terminated, notwithstanding the earlier termination or expiration of this Agreement.
5. Indemnification. The Developer releases from , and covenants and agrees that the City, its
governing body members, officers, agents, including the independent contractors, consultants and legal
counsel, servants and employees thereof (hereinafter, for purposes of this Section, collectively the
“Indemnified Parties”) shall not be liable for, and agrees to indemnify and hold harmless the Indemnified
Parties against any loss or damage to property or any injury to or death of any person occurring at or about
or resulting from any defect in the Development or any environmental condition(s) on, in or under the
Development Parcel (including but not limited to the presence or release of any hazardous substance or
material) or any investigation, monitoring or remediation performed in connection therewith, provided that
the foregoing indemnification shall not be effective for any actions of the Indemnified Parties that are not
contemplated by this Agreement or which result from negligent or willful acts of the Indemnified Parties
in fulfilling the obligations of the City or its agents as set forth under this Agreement. The obligations
within this Section shall survive termination or expiration of this Agreement.
6. Term and Termination. This Agreement shall remain in force until the TID Closure Date, unless
earlier terminated by mutual consent or as a result of material breach by either party, provided, however,
that termination for breach shall include written notice of the election to so terminate. Notwithstanding
anything to the contrary, before either City or Developer may terminate this Agreement for breach by the
other party, such party seeking termination shall first give the other party at least ten (10) days written
notice to cure such failure, or if such failure cannot be reasonably cured within said 10-day period then to
commence cure and complete cure within a reasonable time thereafter not to exceed sixty (60) days.
7. Assignment of Agreement. T he Developer may not assign its rights or obligations under this
Agreement without the prior consent of the City, not to be unreasonably withheld, conditioned or delayed.
Notice of any such assignment shall be provided to the City together with a copy of any assignment
agreement.
8. Memorandum; Successors and Assigns. The parties shall execute a memorandum of this
Agreement in the form attached hereto as Exhibit D, which shall be recorded in the office of the Register
of Deeds for Jefferson County. Until termination of this Agreement, the provisions of this Agreement
specifically related to the Development Parcel will run with the land and will be binding upon the
Development Parcel and each owner, lessee and mortgagee of all or any of the portions of the Development
Parcel and its successors and assigns.
9. Miscellaneous.
Page 6 of 22
a. Notices. All notices, demands, certificates or other communications under this Agreement
shall be sufficiently given and shall be deemed given when hand delivered or when mailed by certified
mail, postage prepaid, or sent by recognized commercial courier properly addressed as indicated below:
To the City:
City of Waterloo
Attn: City Clerk
136 North Monroe Street
Waterloo, WI 53594
To the Developer:
Drumlin Fields Waterloo LLC
c/o Brew City Capital Group LLC
Attn: Noah Jacobson
12645 W. Burleigh Rd., Suite 27
Brookfield, WI 53005
b. Entire Agreement; Amendment/Modification. This Agreement, together with all recitals
and exhibits, all of which are expressly incorporated herein by reference, constitutes the entire agreement
between the parties concerning the subject matter hereof and supersedes all prior and contemporaneous
agreements, negotiations, discussions, correspondence, understandings, and representations, whether oral
or written, relating thereto. This Agreement may be amended or modified only by a written amendment
approved and executed by the parties.
c. No Waiver. No waiver of any provision of this Agreement shall constitute a waiver of any
other provision or a continuing waiver of the same provision unless stated in a written instrument signed
by the waiving party. No waiver of any default shall constitute a waiver of any subsequent default of the
same or any other nature.
d. Severability. If any part, term, or provision of this Agreement is held by a court of
competent jurisdiction to be illegal or otherwise unenforceable, such illegality or unenforceability shall not
affect the validity of any other part, term, or provision , and the rights of the parties will be construed as if
the invalid part, term, or provision was never part of the Agreement.
e. Governing Law/Venue. This Agreement shall be governed by and construed according to
the laws of the State of Wisconsin. Any legal action arising out of this Agreement shall be venued in the
circuit court for Jefferson County, Wisconsin. The Developer expressly waives the right to bring such
action in, or to remove such action to, any other court whether state or federal, unless it is determined that
the Jefferson County Circuit Court lacks jurisdiction.
f. Neutral Construction. The parties acknowledge that this Agreement is the product of
negotiations between the parties and that, prior to the execution hereof, each party has had full and adequate
opportunity to have it reviewed by, and to obtain the advice of, its own legal counsel. Nothing in this
Agreement shall be construed more strictly for or against either party because that party’s attorney drafted
this Agreement or any part hereof.
g. Counterparts. This Agreement may be executed electronically and in one or more
counterparts, each of which will be deemed an original.
Page 7 of 22
h. No Third Party Beneficiaries. This Agreement creates rights and obligations only for the
parties hereto and their permitted successors and assigns, except as stipulated in this Agreement. This
Agreement is not intended to and does not create any right in any third party, not expressly stated herein.
i. No Partnership. Under this Agreement, the City does not, in any way or for any purpose,
become a partner, employer, principal, agent, or joint venturer of or with the Developer.
j. Public Records Law. The Developer acknowledges the City is a public entity subject to
the Wisconsin Public Records Law, Wis. Stat. §§ 19.31 et seq. The Developer shall reasonably cooperate
with the City to facilitate compliance with the Wisconsin Public Records Law, and upon request by the
City, provide to the City all documents in its possession or control which are subject to release under such
law.
k. Nonwaiver of Governmental Immunity. Notwithstanding any provision to the contrary
contained herein, no provision of this Agreement shall be construed as a waiver of any immunity or
limitation of liability granted to or conferred upon any party by applicable provisions of Wisconsin law.
l. Force Majeure. Notwithstanding anything to the contrary, if any default or delay occurs
which prevents or materially impairs a party's performance and is due to a cause beyond the party's
reasonable control, including, but not limited to, any act of any God, flood or other adverse and significant
weather condition, fire, explosion, earthquake, casualty, accident, war, revolution, civil commotion,
blockade or embargo, labor dispute, supply-chain interruption, injunction, law, proclamation, order,
regulation or governmental demand, the affected party shall promptly notify the other party in writing of
such cause and shall exercise diligent efforts to resume performance under this Agreement as soon as
possible. Neither party shall be liable to the other party for any loss or damage due to such cause. Neither
party may terminate this Agreement because of such default or delay.
THE FOLLOWING EXHIBITS ARE ATTACHED AND INCORPORATED HEREIN:
Exhibit A: Description of the Development Parcel
Exhibit B: Description of the Development
Exhibit C: Municipal Revenue Obligation
Exhibit D: Memorandum of Development Agreement
Exhibit E: Public Improvements
SIGNATURE PAGES IMMEDIATELY FOLLOW
Page 8 of 22
IN WITNESS WHEREOF, the parties have executed this Agreement effective as of the last date of
signature below.
CITY:
CITY OF WATERLOO
By:_________________________________ ______________________
Jenifer Quimby, Mayor Date
ATTEST:
_________________________________ ______________________
_____________________, City Clerk Date
State of )
) ss.
County of )
Personally came before me this ____ day of ______________, 2026, the above-named Jenifer
Quimby and _________________, being the Mayor and the City Clerk of the City of Waterloo,
Wisconsin, to me known to be the persons who executed the foregoing instrument on behalf of the
company and acknowledged the same.
_____________________________
Print Name: ________________________
Notary Public, State of Wisconsin
My Commission expires: _____________________
[SIGNATURES CONTINUE ON NEXT PAGE]
Page 9 of 22
DEVELOPER:
DRUMLIN FIELDS WATERLOO LLC
By: Brew City Capital Group LLC
Its: Manager
By:_________________________________ ___________________
Noah Jacobson, Manager Date
State of )
) ss.
County of )
Personally came before me this ____ day of ______________, 2026, the above-named Noah
Jacobson, the Manager of Brew City Capital Group LLC, a Wisconsin limited liability company, being the
Manager of Drumlin Fields Waterloo LLC, a Wisconsin limited liability company, to me known to be the
person who executed the foregoing instrument on behalf of the company and acknowledged the same.
_____________________________
Print Name: ________________________
Notary Public, State of Wisconsin
My Commission expires: _____________________
DRAFTED BY:
Attorney Christopher T. Nelson
AXLEY LLP
2 East Mifflin Street
Madison, Wisconsin 53701-1767
Page 10 of 22
EXHIBIT A
Description of the Development Parcel
Lot 1, Certified Survey Map No. 6081, Recorded in Vol. 35 of Certified Survey Maps, Page 257, as
Document No. 1426857, in the City of Waterloo, Jefferson County, Wisconsin.
For Informational Purposes Only: Tax Key No. 290-0813-0611-006
Page 11 of 22
EXHIBIT B
Description of the Development
Page 12 of 22
[END]
Page 13 of 22
EXHIBIT C
Municipal Revenue Obligation
CITY OF WATERLOO
TAX INCREMENT DISTRICT NO. 5
MUNICIPAL REVENUE OBLIGATION SERIES (____)
THIS MUNICIPAL REVENUE OBLIGATION (the “Obligation”) is issued pursuant to Wis. Stat. §
66.0621 this _________ day of _______________, 20__ by the City of Waterloo, Jefferson County,
Wisconsin (the “City”) to Drumlin Fields Waterloo LLC, a Wisconsin limited liability company, its
successors or assigns (“Developer”).
WITNESSETH:
1. The City and the Developer have entered into a development agreement in Tax Increment District
No. 5, dated __________, 2026 (the “Development Agreement”).
2. This Obligation is issued by the City pursuant to the Development Agreement.
3. Terms that are capitalized in this Obligation that are not defined in this Obligation and that are
defined in the Development Agreement shall have the meanings assigned to such terms by the Development
Agreement.
4. Promise to Pay. The City shall pay to Developer seventy-five percent (75%) of the Excess Tax
Increment under the terms and conditions provided in the Development Agreement, less any amounts due
to the City from the Developer pursuant to the Development Agreement. The total cumulative payments
to the Developer under this Obligation shall not exceed Two Million Four Hundred Seventy Thousand
Seven Hundred Ninety-Five and No/100 U.S. Dollars ($2,470,795.00).
5. Limited Obligation of City. This Obligation shall not constitute a charge against the City’s general
credit or taxing power. The City shall not be subject to any liability hereunder or be deemed to have
obligated itself to pay Developer any amounts from any funds except from the Excess Tax Increment, and
then only to the extent and in the manner herein specified and in the Development Agreement.
6. Subject to Annual Appropriations. Each payment under this Obligation shall be subject to annual
appropriation by the City in accordance with the requirements for revenue obligations and in a manner
approved by the City’s bond counsel and in accordance with the Development Agreement.
7. Miscellaneous. This Obligation is subject to the laws of the State of Wisconsin governing tax
incremental financing and to the Development Agreement.
Dated this _______ day of ______________, 20____.
CITY OF WATERLOO
EXHIBIT ONLY – NOT FOR SIGNATURE
By:_________________________________
Page 14 of 22
Jenifer Quimby, Mayor Date
EXHIBIT ONLY – NOT FOR SIGNATURE
By:_________________________________
______________, City Clerk Date
Page 15 of 22
EXHIBIT D
Memorandum of Development Agreement
(Separately Attached)
Document Number
MEMORANDUM OF
DEVELOPMENT AGREEMENT
Document Title
Recording Area
Drafted by and Return Address:
Michael Best & Friedrich LLP
Attn: Jonathan Luljak, Esq.
790 N. Water Street, STE 2500
Milwaukee, WI 53202
See Exhibit A
Parcel Identification Number(s)
THIS PAGE IS PART OF THIS LEGAL DOCUMENT – DO NOT REMOVE.
MEMORANDUM OF DEVELOPMENT AGREEMENT
THIS MEMORANDUM OF DEVELOPMENT AGREEMENT (this “Memorandum”) is made as
of _____________, 2026, by and between the CITY OF WATERLOO, a Wisconsin municipal corporation
(the “City”), and DRUMLIN FIELDS WATERLOO LLC, a Wisconsin limited liability company (the
“Developer”).
RECITALS
A. The Developer owns the real property located in the City of Waterloo, Jefferson County,
Wisconsin, and legally described on Exhibit A attached to this Memorandum and incorporated
herein by reference (the “Development Parcel”).
B. The City and the Developer entered into a Development Agreement dated _____________,
2026 (the “Development Agreement”), concerning the development of the Development Parcel
within the City’s Tax Incremental District No. 5.
C. The parties desire to record this Memorandum to provide notice of the Development
Agreement and of certain obligations affecting the Development Parcel, without recording the
Development Agreement in full.
NOW, THEREFORE, for good and valuable consideration, receipt and sufficiency of which is
hereby acknowledged, the parties state and agree as follows:
1. Development Agreement. The foregoing recitals are incorporated into this Memorandum. The
Development Agreement governs the parties’ rights and obligations relating to the Development Parcel.
This Memorandum is only a summary and is not intended to amend, modify, expand, limit, replace, or
supersede the Development Agreement. If this Memorandum conflicts with the Development Agreement,
the Development Agreement controls.
2. Development Obligations. The Development Agreement requires the Developer, among other
obligations, to construct the development and the associated on-site and off-site public improvements in
accordance with plans, specifications, conditions, laws, codes, and approvals applicable under the
Development Agreement.
3. Tax Increment Financing Assistance. Subject to the requirements, conditions, limitations, and
annual appropriation provisions of the Development Agreement, the City has agreed to issue a municipal
revenue obligation payable as set forth in the Development Agreement.
4. Covenants Affecting the Development Parcel. The Development Agreement further provides
that the provisions specifically related to the Development Parcel run with the land and bind the
Development Parcel and its owners, lessees, mortgagees, successors, and assigns until termination as
provided in the Development Agreement.
5. Notices. Notices under the Development Agreement must be delivered as provided in the
Development Agreement to the City at City of Waterloo, Attn: City Clerk, 136 North Monroe Street,
Waterloo, Wisconsin 53594; and to the Developer at Drumlin Fields Waterloo LLC, 12645 W. Burleigh
Road, Suite 27, Brookfield, Wisconsin 53005, or to any replacement address designated in accordance with
the Development Agreement.
6. Counterparts. This Memorandum may be executed in counterparts, each of which is deemed
an original and all of which together constitute one instrument. This Memorandum shall be recorded in the
Register of Deeds of Jefferson County, Wisconsin.
(Signature Page Follows)
IN WITNESS WHEREOF, the parties have executed this Memorandum as of the dates set forth
below.
CITY:
CITY OF WATERLOO
By: ____________________________________ Date: ______________
Jenifer Quimby, Mayor
ATTEST:
By: ____________________________________ Date: ______________
______________________, City Clerk
STATE OF WISCONSIN )
) ss.
COUNTY OF JEFFERSON )
Personally came before me this ____ day of ______________, 2026, the above-named Jenifer
Quimby, Mayor, and ______________________, City Clerk, of the City of Waterloo, to me known to be
the persons who executed the foregoing instrument on behalf of the City and acknowledged the same.
________________________________________
Print Name: ____________________________
Notary Public, State of Wisconsin
My commission: expires ______________ / is permanent
(Signatures Continue on Next Page)
DEVELOPER:
DRUMLIN FIELDS WATERLOO LLC,
a Wisconsin limited liability company
By: Brew City Capital Group LLC
Its: Manager
By: ____________________________________ Date: ______________
Name: Noah Jacobson
Title: Manager
STATE OF _______________ )
) ss.
COUNTY OF ______________ )
Personally came before me this ____ day of ______________, 2026, the above-named Noah
Jacobson, the Manager of Brew City Capital Group LLC, a Wisconsin limited liability company, being the
Manager of Drumlin Fields Waterloo LLC, a Wisconsin limited liability company, to me known to be the
person who executed the foregoing instrument on behalf of the company and acknowledged the same.
________________________________________
Print Name: ____________________________
Notary Public, State of ________________
My commission: expires ______________ / is permanent
EXHIBIT A
Legal Description of Development Parcel
Lot 1, Certified Survey Map No. 6081, recorded in Volume 35 of Certified Survey Maps, Page 257, as
Document No. 1426857, in the City of Waterloo, Jefferson County, Wisconsin.
For Informational Purposes Only: Tax Key No. 290-0813-0611-006
EXHIBIT E
Public Improvements
1. Extend the public sidewalk north along Monroe Street up to W. Clarkson Road.
2. Extend the sanitary sewer north on Monroe Street up to W. Clarkson Road.
[End]
136 North Monroe Street
Waterloo, Wisconsin 53594-1198
Phone (920) 478-3025
Fax (920) 478-2021
www.waterloowi.us
__________________________________________________________________________________________
RESOLUTION # 2026 – 53
RESOLUTION AUTHORIZING A TEMPORARY 10% COMPENSATION INCREASE FOR GABE HABERKORN FOR
PERFORMING CITY CLERK DUTIES
WHEREAS, the City of Waterloo, Wisconsin, requires continuity of municipal administrative services and the performance
of City Clerk duties; and
WHEREAS, Gabe Haberkorn has performed and is performing additional duties and responsibilities associated with the
City Clerk position and related City Clerk functions; and
WHEREAS, the Common Council of the City of Waterloo recognizes the additional responsibilities being undertaken by
Gabe Haberkorn in performing these duties; and
WHEREAS, the Common Council desires to provide additional compensation in recognition of the temporary assumption
and performance of these City Clerk duties; and
WHEREAS, the Common Council has determined that a temporary 10% increase in compensation is appropriate for the
period during which these additional City Clerk duties are being performed; and
WHEREAS, the temporary compensation increase shall be retroactive to August 6, 2026, and shall remain in effect
through October 5, 2026, unless otherwise amended by action of the Common Council;
NOW, THEREFORE, BE IT RESOLVED, by the Common Council of the City of Waterloo, Wisconsin, that Gabe
Haberkorn is hereby authorized to receive a temporary 10% increase in compensation in recognition of performing
additional City Clerk duties and responsibilities.
BE IT FURTHER RESOLVED, that the 10% temporary compensation increase shall be effective retroactively beginning
August 6, 2026, through October 5, 2026.
BE IT FURTHER RESOLVED, that this temporary increase shall apply only to the specified period and shall not be
construed as a permanent change to Gabe Haberkorn's regular rate of compensation or employment classification.
BE IT FURTHER RESOLVED, that the City Clerk and appropriate City personnel are authorized and directed to make
any necessary payroll adjustments to implement this resolution, including payment of the applicable retroactive
compensation from August 6, 2026, forward.
BE IT FINALLY RESOLVED, that this Resolution shall take effect immediately upon adoption.
PASSES AND ADOPTED this 17th day of September 2026
City of Waterloo
Signed: ______________________________________
Jenifer Quimby, Mayor
Attest: _________________________________
Charles Kuhl, Council President
Sponsor(s): Finance, Insurance, & Personnel
136 North Monroe Street
Waterloo, Wisconsin 53594-1198
Phone (920) 478-3025
Fax (920) 478-2021
www.waterloowi.us
__________________________________________________________________________________________
RESOLUTION # 2026 – 54
RESOLUTION AUTHORIZING PAYOUT OF ACCUMULATED COMPENSATORY TIME FOR PARKS
COORDINATOR GABE HABERKORN
WHEREAS, the City of Waterloo employs Gabe Haberkorn as the Parks Coordinator; and
WHEREAS, Gabe Haberkorn has accumulated a total of 80 hours of compensatory time; and
WHEREAS, the City of Waterloo desires to authorize the payout of 60 hours of the accumulated compensatory
time to Gabe Haberkorn; and
WHEREAS, following the authorized payout, 20 hours of compensatory time shall remain available to Gabe
Haberkorn, subject to applicable City policies and employment regulations; and
WHEREAS, the payout shall be processed through the City's normal payroll procedures and shall be subject to
all applicable federal, state, and local withholding requirements;
NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Waterloo, Wisconsin, hereby
authorizes the payment of 60 hours of accumulated compensatory time to Gabe Haberkorn, Parks
Coordinator, at his applicable regular rate of pay, in accordance with City policy and applicable law.
BE IT FURTHER RESOLVED, that the City Clerk/Treasurer and appropriate City staff are authorized and
directed to take all necessary administrative and payroll actions to implement this resolution.
PASSES AND ADOPTED this 17th day of September 2026
City of Waterloo
Signed: ______________________________________
Jenifer Quimby, Mayor
Attest: _________________________________
Charles Kuhl, Council President
Sponsor(s): Finance, Insurance, & Personnel
136 North Monroe Street
Waterloo, WI 53594
Phone: (920) 478-3025
Fax: (920) 478-2021
www.waterloowi.us
____________________________________________________________________________ _______
ORDINANCE #2026-10
AN ORDINANCE UPDATING FUND DEBT POLICY
§ 53-11. Fund balance policies. [Added 3-15-2007 by Ord. No. 2007-07]
A. Objective. A formally adopted policy will help eliminate ambiguity regarding maintaining appropriate
fund balances.
B. Definition. The general fund is the general operating fund of the City of Waterloo. It is used to account
for all financial resources except those required to be accounted for in other funds.
Undesignated/Unreserved general fund balance is the portion of the general fund not assigned to a
defined purpose.
C. Policy. To preserve working capital and to adequately prepare for unforeseen events, which will
require ready access to funds, the City of Waterloo requires that the undesignated fund balance shall
be between 25% and 33% of the general fund budget. Amounts exceeding 33% shall be transferred to
a contingency the Infrastructure Reserve fund. Any expenditure from a contingency the Infrastructure
Reserve fund must be for one-time, nonrecurring costs and requires Council action follow the procedure
as required under resolution 2026-44 [Amended 10-4-2007 by Ord. No. 2007-19, AmendedXX-XX-2026
by Ord No. 2026-10] *this section will be inserted by ecode**
D. Procedure. The City of Waterloo Clerk-Treasurer-Deputy Clerk or designee shall annually review the
levels of undesignated fund balance to ensure that appropriate levels are maintained and issue a
report to the Council.
E. Formula.
Adopted at the Organizational meeting of the Common Council on ______ of ____________, 2026.
CITY OF WATERLOO
___________________________________
Jenifer Quimby, Mayor
Attest: _________________________________
Denise Knutson, Interim City Clerk/Treasurer
Date Adopted: _____________________
Date Published: ____________________
Resolution #2026-44