January
Village of Valders · Manitowoc County · Minutes
Open the original document More from Village of Valders
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
VALDERS VILLAGE BOARD MEETING MINUTES
JANUARY 12, 2026
Followed by the Pledge of Allegiance in the absence of President Schneider, Village
Clerk/Treasurer Bruckner called the regular monthly meeting of the Valders Village
Board to order at 7:00PM at the Valders Village Office, 207 S. Liberty Street.
Bruckner called for a motion to appoint a President Pro Tem for the meeting. Motion
by Sabel, second by Bartelme to appoint Trustee Baroun as President Pro Tem.
Motion carried. Trustees present: Paul Baroun, Marcus Bartelme, Ann Galley & Dan
Sabel. Schneider absent & excused.
Baroun announced he would like to amend the agenda to include a closed session in
accordance with Wisconsin State Statutes 19.85(1)(c) public employee evaluation
and information gathering. Motion by Bartelme, second by Galley to amend the
posted agenda with the amendment for a closed session as requested by Baroun.
Motion carried.
No one was present for public input. Motion by Bartelme, second by Sabel to close
public input. Motion carried.
Motion by Bartelme, second by Sabel to approve minutes from 12/1/25 as presented
by Clerk/Treasurer Bruckner. Motion carried.
Motion by Sabel, second by Galley to approve the December Treasurer’s reports as
presented by Bruckner for all department funds. Motion carried.
Motion by Galley, second by Bartelme to approve January Village, Fire & EMS
vouchers; payroll direct deposits # 1975 - #2011; checks #22671 - #22720 &
electronic payments totaling $141,680.33 as presented by Bruckner. Motion carried.
Motion by Bartelme, second by Sabel to approve January Utility vouchers; checks
#9177 - #9185 totaling $31,821.59 as presented by Bruckner. Motion carried.
Notification of the Manitowoc County Village Association Meeting to be held 1/21/26
hosted by the Village of Whitelaw at 7 Lakes Golf Course beginning at 6:30 PM,
topic-round table discussion, A quorum of the board may or may not be present at the
association informational meeting.
Board reviewed the Manitowoc County Sheriff’s Patrol December reports.
Fire/EMS Reports for December were presented by Christopher Dallas, Fire Chief &
EMS Director. There were 78 Fire & EMS calls for service in December. 2025 total of
80 Fire calls & EMS 642 calls (a record) . 2025 Fire & EMS budget comparison
numbers will be presented after all 2025 required auditor an d accounts payable
entries have been completed by Bruckner. 16 of 23 Fire members attended training
for Rapid Intervention Firefighter conversions for removal. Tender #34 is at Stocks
Manufacturing for repair; Engine 35 lighting issues have been resolved. Engine 33
had the leaf springs and exhaust system replaced. Four paramedics have applied to
and will be interviewed to work part time on call for the EMS Service for shift fill ins.
Review of the 2025 Ambulance Budget with EMS municipalities served will be on
3/26/26 at 6:30PM at the Valders Fire Station.
The board reviewed a resolution initiated by Wisconsin Counties to show local
support to create a State Individual Assistance Program for disaster aid as there is
not a guarantee disaster needs will be covered by federal aid. To initiate this State
program would provide emergency aid more quickly to the people in need in our local
communities. Motion by Bartelme, second by Sabel, to adopt the Resolution 2026-1
Support for the creation of a State Individual Assistance Program. Motion carried.
Dallas reviewed with the board a Mutual Aid Agreement with Aegis Group Inc.
dba/County Rescue Services -AEMT and Valders Fire and Rescue , whe re upon
request to meet emergency service demand if either party is available to respond.
Also reviewed an Intercept Agreement upon request for Valders EMS to respond to
an ALS Intercept; if available and it would not comprise coverage within our primary
service area for a flat fee of $300.00 to local hospitals. After questions and further
discussion motion by Sabel, second by Bartelme to enter into a Mutual Aid
Agreement between Aegis Group Inc. dba County Rescue Services -AEMT and
Valders and Fire Rescue. Motion carried. Motion by Bartelme, second by Sabel to
enter into an Intercept Agreement with AEGIS Group Inc. dba County Rescue
Services-AEMT and Valders Fire and Rescue. Motion carried.
DPW/OIC Austin Shillcox introduced Brad Stuczynski of MSA Professional Services
Inc. to review the results of the PFAS Mitigation Feasibility Study with the Board.
Well #1 is within current and anticipated future PFAS compliance standards by the
State in 2029 and the EPA in 2031. Well #2 current levels are in compliance, but it
will not meet the proposed future compliance limits. MSA presented potential long-
term solutions as follows: Reconstruct Well #2 with a deeper casing to provide better
protections from surface level contaminants; Construct treatment facilities for Well #2;
Construct a new Well #3 to replace the existing Well #2; or to Connect to a nearby
Utility that supplies water with PFAS below the proposed limits.
MEETING CONVENED &
ROLL CALL/APPOINTED
PRESIDENT PRO TEM
FOR MEETING
APPROVED TO AMEND
THE AGENDA FOR THE
ADDITION OF A CLOSED
SESSION
NO PUBLIC INPUT
MINUTES APPROVED
TREASURER REPORT
APPROVED
VILLAGE/FIRE/EMS
VOUCHERS APPROVED
UTILITY VOUCHERS
APPROVED
ANNOUNCEMENT OF
MCVA MEETING 1/21/26
REVIEW MCSD PATROL
REPORTS DECEMBER
REVIEW FIRE AND EMS
MONTHLY REPORTS
APPROVED RES 2026 -1
LOCAL SUPPORT TO
INITIATE A STATE
INDIVIDUAL
ASSISTANCE PROGRAM
APPROVED MUTUAL AID
& INTERCEPT
AGREEMENT BETWEEN
AEGIS GROUP INC/DBA
COUNTRY RESCUE
SERVICES-AEMT &
VALDERS FIRE/ RESCUE
MSA PFAS MITIGATION
FEASIBLITY STUDY
REVIEWED
1/12/2026 MINUTES
Stuczynski and Shillcox answered board questions, it was discussed to proceed with
recommended packer testing to determine if future compliance levels can be
obtained without investing in further water treatment. This is to determine if Well #2
could possibly be reconstructed with a deeper casing, which is the most economical
option. Motion by Sabel, second by Bartelme to enter into a Professional Service
Agreement with MSA for Well #2. The scope of this work is to prepare specifications
and conduct investigative work for removal and replacement of the well pump,
geophysical logging, various testing and sampling and water quality analysis, work
with pump contractor, review and evaluate results and provide memo summarizing
results and recommendations on well reconstruction and/or next steps for an
estimate of $16,800, utilizing PFAS litigation funds for the expense. Motion carried.
Items pertaining to the matter will be on February agenda for any actions which may
need to be taken by the Board.
Shillcox reviewed the December Public Works report with the board. Staff plowed &
salted for several December snowfall/ice events. Staff has trimmed some trees which
overhang sidewalks or roadways for compliance to municipal code 8.07. WIS DOT
6’-20’ Storm Sewer culvert inspection program was completed. The report recap
provides for 1 year inspection intervals and to schedule future culverts to be replaced
to coincide with future reconstruction project of Lincoln Street when feasible. All
required Water and Wastewater sampling and monitoring requirements have been
completed for 202 5. The required 2026 monitoring schedule and sampling
requirements will be taken by our staff and will work with certified laboratories to
complete and to obtain results throughout the year accordingly. The current SCADA
license has gone end of life and is on borrowed time with the Microsoft 10 support
being phased out. The system will continue to operate as normal until there is an
irreparable issue or no support. Budgetary quote from our current SCADA system
vendor has been obtained for board review to make necessary upgrades. The Clarks
Mills Sanitary District collection system permit has been renewed until 12/31/2030 by
the DNR.
Review of quote and upgrade to the SCADA will be postponed until the February
meeting for full board review and decision.
Update pertaining to termination of contract with VC3 for computer and cyber security
services is postponed until the February meeting in Schneiders absence.
Motion by Baroun, second by Bartelme at 8:0 2PM to convene in closed session in
accordance with Wisconsin State Statutes 19.85(1)(c) consideration of public
employee evaluation and information. Motion carried.
Motion by Baroun, second by Bartelme to convene in open session in accordance
with Wisconsin State Statutes 19.85(2) at 8:26PM. Motion carried. There were no
motions resulting from the closed session.
Motion by Sabel, second by Galley to adjourn meeting at 8:28PM. Motion carried.
Respectfully submitted,
VILLAGE OF VALDERS
Lori Bruckner
Village Clerk/Treasurer
APPROVED SERVICES
AGREEMENT WITH MSA
FOR WELL #2 (PACKER
TESTING) UTILIZING
PFAS LITGATION FUNDS
REVIEW OF PUBLIC
WORKS MONTHLY
REPORT
ITEMS POSTPONED
UNTIL FEBRUARY
MEETING
MOTION TO CONVENE
IN CLOSED SESSION
MOTION TO
RECONVENE IN OPEN
SESSION
MEETING ADJOURNED
1/12/2026 MINUTES
Source: Village of Valders website. First collected Oct 12, 2026.