February
Village of Valders · Manitowoc County · Minutes
Open the original document More from Village of Valders
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
VALDERS VILLAGE BOARD MEETING MINUTES
FEBRUARY 9, 2026
Followed by the Pledge of Allegiance Village President Schneider, called the regular
monthly meeting of the Valders Village Board to order at 7:00PM at the Valders
Village Office, 207 S. Liberty Street. Trustees present: Devan Schneider, Paul
Baroun, Marcus Bartelme (arrived to the meeting at 7:10PM) & Dan Sabel. Ann
Galley absent & excused.
Motion by Baroun, second by Sabel to adopt the agenda Motion carried.
No one was present for public input. Motion by Bartelme, second by Sabel to close
public input. Motion carried.
Motion by Sabel, second by Baroun to approve minutes from 1/12/26 as presented by
Clerk/Treasurer Bruckner. Motion carried.
Motion by Sabel, second by Baroun to approve the January Treasurer’s reports as
presented by Bruckner for all department funds. Motion carried.
Motion by Sabel, second by Baroun to approve January Village, Fire & EMS
vouchers; payroll direct deposits # 2012 - #2065; checks #22721 - #22778 &
electronic payments totaling $654,007.01 as presented by Bruckner. Motion carried.
Motion by Schneider, second by Sabel to approve January Utility vouchers; checks
#9186 - #9199 & 2026 budgeted transfers totaling $89,028.99 and check #1093 for
$5,000.00 as presented by Bruckner. Motion carried.
The board discussed potentially holding a Farmers Market/Vendor Fair at the Valders
Memorial Park Lot on Wednesdays from June to the end of September from 3:30 -
6:30PM. Adam Mejia resident and office assistant talked to Schneider about it and
said he already has interest from several vendors. It was discussed to possibly have
the Lions Club involved in the weekly event. Schneider suggested the possibility of
small local bands to play at the event and food trucks . The board is in favor of the
idea but want to find out what other communities with established markets charge for
a vendor fee and vendor requirements. A motion by Baroun, second by Sabel to
postpone the matter to obtain more information until the next meeting. Motion carried.
Board reviewed the Manitowoc County Sheriff’s Patrol January reports.
Fire/EMS Reports for January were presented by Christopher Dallas, Fire Chief &
EMS Director. There were 82 EMS and 12 Fire calls for service in January. 16 of 23
members attended training for EMS Operation s, cot & stair chair operations,
ambulance inventory equipment locations and Fire Engine inventory. Tender #34 is
still at Stocks Manufacturing for repair. Ambulance #9 had two bad alternators
replaced. The inverter was bypassed and a battery kill switch to the power system
was added. Ambulance #9 passed DOT inspection. All overhead doors at the Fire
Station were serviced and cable wires replaced on three. One door panel has crack
down the middle and vendor recommended door replacement. One of the f our
applicants for a part-time paramedic after review has been referred for pre -
employment physical and awaiting results prior to hire. Cvikota will virtually present a
review of the 2025 accounts receivable the March 9th meeting. Review of the 2025
Ambulance Budget with EMS municipalities served will be on 3/26/26 at 6:30PM at
the Valders Fire Station.
Dallas provided background information on the ambulance replacement planning
process initiated in 2024, including vendor research, specification development, and
financial forecasting. In June 2024, the department identified vendors capable of
meeting our operational and safety requirements. In November 2025, Request for
Bids (RFBs) were issued to multiple venders, specifically: American Rescue Vehicles
(ARV), Pomasl / Crestline / Demers, Lifeline, Horton / Foster Coach, North Central /
Braun / Osage, and Everest. Only t wo bids were received by the February 3 rd
deadline. Bidder representatives Kelly Silha of American Response Vehicles and
Ryan Lynch of Pomasl Fire Equipment were present at the meeting to provide
information and answer questions pertaining to their bids submitted.
Dallas stated the only the bid submitted which was compliant with our specifications
was by ARV. Vendors advised to expect a 20–24-month lead time, once the order
was placed. Based on operational needs, provider and patient safety considerations,
and long-term financial planning, Dallas recommended approval to proceed with the
purchase of one new ambulance utilizing the door -forward configuration under the
outlined financial strategy and submitted by American Response Vehicles (ARV),
who met the bid specification in entirety.
Pomasl could not meet door forward concept with a type 3 ambulance, as the bid
specification required. Pomasl submitted an exception to the bid and a Crestline mini-
mod model was presented a 166” body, the bid requested 172”. They also submitted
a Demers ambulance without the door forward concept. The service currently has a
Crestline ambulance and we do not like it, and do not want another Crestline.
MEETING CONVENED &
ROLL CALL
AGENDA APPROVED
NO PUBLIC INPUT
MINUTES APPROVED
TREASURER REPORT S
APPROVED
VILLAGE/FIRE/EMS
VOUCHERS APPROVED
UTILITY VOUCHERS
APPROVED
POSTPONED ANY
DECISIONS PERTAINING
TO FARMERS MARKET &
VENDOR FAIR AT THE
PARK
REVIEW MCSD PATROL
REPORTS JANUARY
REVIEW FIRE AND EMS
MONTHLY REPORTS
REVIEW OF
AMBULANCE BIDS
2/09/2026 MINUTES
Pomasl did not provide any bid specification exceptions for consideration, only two
sheets with ambulance information, warranty and price were included. The board
asked many questions of Dallas. Each bidder representative was given opportunities
to provide additional information on their ambulance bids or to answer questions by
trustees. After lengthy discussion Schneider could tell the board members present
were in a disconnect in making a decision and would like to give this more thought
and further research the rigs presented in the bids received. Motion by Schneider,
second by Sabel to postpone decision until the March meeting. Motion carried.
Motion by Baroun, second by Sabel to approve to transfer 2025 Fire Budget Balance
amount of $6,000 to the Fire Replacement from the Fire General Fund. Motion
carried.
Motion by Bartelme, second by Baroun to approve to transfer 2025 EMS Budget
Balance amount of $10,000 to the Retire/Sick Pay Fund and amount of $36,000 to
the EMS Replacement from the EMS Non-Restricted Fund. Motion carried.
DPW/OIC Shillcox reviewed the monthly Public Works report with the board. The
second quarterly large refuse drop cycle was completed. So far both events have not
brought in enough revenue to cover the expense of the dumpster fee. The contract
for the containers at our Recycle Center with Waste Management will expire 12/2026.
The board advised to continue the current operational practices and advised Shillcox
to do Request for Proposals in early fall to award prior to 2027 budget preparation.
Shillcox explained he is in the early stages of exploring consolidation of a portion of
water distributions sanitary sewer lines that extend north on North Adams Street past
Kennedy Street up to the stone quarry scale house, the services were deactivated in
2015 leaving about 1,000 feet each of unnecessary utilities that pose more cause for
concern than benefit. Valders Stone and Marble have indicated they have no future
use for these utilities. I am awaiting this in writing. There are many large stones and
quarry material on top of where mains are buried and in the event of failure, access
would be very difficult to repair. More on this process will be provided to the board
when available. Effluent phosphorus levels average 1.177 mg/L for January over the
permit limit of 1.0 mg/L resulting in a noncompliance report submitted to the DNR.
Freezing temperatures caused hindered settling and reduced treatment efficiency for
the system that relies heavily on microbial activity. Both clarifiers are 32 years old
and will need to be rehabilitated with the next upgrade or sooner. The next permit
cycle beginning in Fall 2027 will likely require upgrades including installation of an
effluent flow meter and disinfection equipment. We are evaluating existing
infrastructure at the facility that has not been in use for many years to be retrofitted to
fit future needs, particularly the existing chlorine contact tank and how it could be
modified as cost savings for future upgrades. Staff was busy in t he Clarks Mills
Sanitary District this month responding to several alarms related to mechanical
failures on one of the lift station pumps and a frozen discharge pipe at another
station.
DPW/OIC Austin Shillcox added Brad Stuczynski of MSA Professional Services Inc.
virtually to the meeting to provide information pertaining to proposals to provide
services for the Investigative Testing – Well #2 discussed at the January meeting .
The board reviewed proposal s from CTW Corporation ; Base $63 ,080 and
Supplemental Items $20,210 and Municipal Well & Pump Base; $93,846 and
Supplemental Items $41,756. Both of the companies have done satisfactory work on
our systems in the past. Shillcox noted the supplemental items may or may not be
needed. Shillcox and Stuczynski answered questions and explained CTW can do the
testing much sooner than MWP , which is important to be able to make future
decisions for necessary PFAS reduction actions to be taken . M otion by Baroun,
second by Bartelme to proceed with outlined proposal services by CTW Corporation,
due to cost and work timelines, utilizing PFAS Litigation Funds. Motion carried.
Shillcox again reviewed quote and necessary upgrade to the SCADA System by PJ
Kortens & Company Inc. for $26,342. This computerized system is at its end of life
and runs our treatment plant, lift stations, wells and tower if it goes down so do our
systems. Motion by Sabel, second by Bartelme to proceed with the SCADA upgrade
utilizing WWTP, Sewer Main, Tower & Water Repair Funds. Motion carried.
Schneider u pdated the board to a conference call on 1/29/26 pertaining to the
termination of contract with VC3 for computer and cyber security services. This is the
third call with different up the ladder company representatives. The entire chain of
events was again explained, with an end result they will need to get back to us with
numbers. Schneider felt the company has shown a complete lack of understanding of
the situation financially and we have not gotten any closer to terminating the contract
since the October board decision to terminate the contract.
Motion by Sabel, second by Bartelme to adjourn meeting at 8:57PM. Motion carried.
Respectfully submitted,
VILLAGE OF VALDERS
Lori Bruckner
Village Clerk/Treasurer
MOTION TO POSTPONE
TO AWARD OR REJECT
AMBULANCE BIDS TO
THE MARCH MEETING
APPROVED TO
TRANSFER 2025 FIRE &
EMS BUDGET
BALANCES TO THREE
INVESTMENT FUNDS
REVIEW OF PUBLIC
WORKS MONTHLY
REPORT
APPROVED CTW
CORPORATION TO
PROVIDE WELL #2
INVESTIGATIVE
TESTING SERVICES
UTILIZING PFAS
LITGATION FUNDS
APPROVED TO
UPGRADE SCADA
SYSTEM UTILITILZING
SEWER AND WATER
REPLACEMENT FUNDS
VC3 CONTRACT
TERMINATION UPDATE
MEETING ADJOURNED
2/09/2026 MINUTES
Source: Village of Valders website. First collected Oct 12, 2026.