Park Committee Agenda & Packet (PDF)
City of Plymouth · Sheboygan County · meeting of Jun 22, 2026 · Agenda packets
Open the original document More from City of Plymouth
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
It is likely a quorum of members of other governmental bodies of the municipality may be in attendance at the above stated me eting to gather
information. No action will be taken by any governmental body at the above stated meeting other than the governmental body specifically referred
to above in this notice.
Please note that, upon reasonable notice, efforts will be made to accommodate the needs of disabled individuals through appro priate aids and
services. For additional information or to request this service, please contact the City of Plymouth Clerk’s Office, located at Plymouth City Hall
at 128 Smith St., Plymouth, WI or call (920) 893-1271.
PLYMOUTH PARKS COMMITTEE
AGENDA
CITY OF PLYMOUTH, WISCONSIN
June 22, 2026 6:00 PM
Plymouth City Hall
Room 210
128 Smith Street
Plymouth, WI 53073
1. Call to order and roll call
2. Approval of October 29, 2025 minutes
3. Election of Chair and Vice Chair
4. Audience Comment
5. Update on City Park Projects
6. Discission and Possible Action Regarding Assigning Park Name for the Dog Park located
within Stayer Park – Plymouth Lions Club
7. Adjourn
Members Present:
Mark M elcher
Mark Levandowski
Jeff Versch
____Katie Schroeder
____Dana Haucke
Staff:
____Cathy Austin
____Anna Voigt
Other:
PLYMOUTH PARKS COMMITTEE
CITY OF PLYMOUTH, WISCONSIN
October 29, 2025 6:00 PM
Plymouth City Hall Room 305
128 Smith Street
Plymouth, WI 53073
UNOFFICIAL MINUTES
1. Call to order and roll call: Chairman Melcher called the meeting to order at 6:30 PM.
Members present were Mark Melcher, Mark Levandowski, Katie Schroeder, Jeff Versch, and
Jeff Tauscheck. Also present: Director of Public Works Cathy Austin and Clerk/Deputy
Treasurer Anna Voigt.
2. Approval of August 6, 2025 minutes: Motion was made by Tauscheck/Levandowski to
approve the minutes. A unanimous aye vote was cast. Motion carried.
3. Audience Comment: None
4. Discussion on City Park Upgrades: Director of Public Works Austin reviewed the
community input from the Open House hosted by Parkitecture + Planning. There were about
50 participants. Attendees reviewed conceptual imagery, provided written comments, and
discussed ideas for enhancing park amenities. Austin handed out potential skateboard
renderings and where pickleball courts could go. Pickleball courts were the main topic of
discussion and if they should be included in City Park or should they be located in another
park. Courts should ideally be located at least 200 feet from nearby residential properties to
reduce potential noise impacts. Two potential spots for courts at City Park could be east of the
parking lot at the bottom of the hill or close to Suhrke Rd. by the skate park. The one at the
bottom of the hill would take away parking spots and the one by Suhrke Rd. does have houses
across the street. Schroeder asked about a lap pool. Austin stated it would be hard to do a lap
pool due to cost. Melcher and committee talked about different spots to put pickleball courts if
not at City Park. Meyer Park was brought up, but Meyer Park has more restrictions. The
committee mentioned Lone Oak Park. Schroeder asked about the skatepark and if it was going
to be all concrete. Austin stated the renderings are all concrete and it hasn’t had any updates
since built. Versch brought up indoor pickleball courts. Austin stated that would have to be
more of a conversation with Plymouth Ed & Rec or Generations. The committee talked about
having them over on the west side of the park by the railroad tracks. Austin was going to look
into it, but it may be hard with the railroad tracks right there. Melcher asked if everything at
the playground was going to be new. Austin stated yes, but somethings will be repurposed to
different parks. Levandowski brought up a splash pad. Austin suggested if there was going to
be a splash pad to be part of the pool area.
5. Communications – Letters, emails, or reports related to the Committee: None
6. Adjourn: Motion was made by Tauscheck/Levandowski to adjourn the meeting at 6:40 PM.
A unanimous aye vote was cast. Motion carried.
1 | Page
City of Plymouth
128 Smith St. - P.O. Box 107
Plymouth, WI 53073-0107
T
elephone: (920) 89
3-3745
Facsimile: (920) 89
3-0183
Web Site: plymouthgov.com
DATE: June 18, 2026
TO: Parks Committee
F
ROM: Cathy Austin, PE, Director of Public Works
R
E: Stayer Park: Dog Park Naming
B
ackground:
In October 2025, Plymouth Downtown Arts and Merchants (D.A.M.) expressed interest in spearheading a
beautification project for the existing dog park located within Stayer Jr. Park. The concept was presented
to the Committee of the Whole, which directed the group to proceed with project development and finalize
the design.
S
ince that time, D.A.M. has partnered with the Plymouth Advancement Association (PAA), which has
assumed leadership of the project. The proposed design has since been updated and is attached. On April
14, 2026, PAA presented the project to the Committee of the Whole as proposed improvements and
associated donation would ultimately require acceptance and approval by the Common Council. A copy of
the meeting minutes from that presentation is attached for reference.
N
aming Request:
Since the April Committee of the Whole meeting, the City has received a request to name the facility the
"Plymouth Lions Dog Park."
P
ursuant to Municipal Code Section 2 -4-7(c), one of the responsibilities of the Parks Committee is to
investigate and recommend all names assigned to parks and facilities within the park system. The
ordinance provides that parks and facilities may be named when one or more of the following conditions
exist:
• The park and/or facility is significant and will be regularly used by the public;
• The park and/or facility is likely to be regularly referred to in public media; or
• Naming the park and/or facility will enhance a sense of community within the City.
T
he ordinance further requires that the Parks Committee review naming applications and make a
recommendation to the Common Council regarding the proposed name.
C
ommittee Consideration:
The Parks Committee should review the naming request and determine whether the proposed name,
"Plymouth Lions Dog Park," is appropriate and consistent with the criteria established in Municipal Code
Section 2-4-7(c). Municipal Code is attached for reference.
F
ollowing discussion, the Committee may make a recommendation to the Common Council regarding
approval or denial of the proposed name. Any recommendation from the Parks Committee would be
forwarded to the Common Council for final consideration and determination.
1
). Proposed name and indicate if you want the logo included. Do the Lions have a specific font used
for your name and the logo. Please attach when returning to Wendy and me.
T
he font is Arial. Several jpgs for the logo are attached: 1 color, 2 color, and black and white.
2
) A brief history of the Plymouth Lions (Maybe 1 -2 paragraphs which also include your mission.
Established in 1964, the Plymouth Lions Club was initially 19 charter members, becoming Wisconsin’s
299th club. The club now consists of 65+ men and women of diverse ages and backgrounds who serve
the local community as well as international causes. Today there are 589 Lions Clubs in Wisconsin with
21,700 members serving. The Plymouth Lions Club remains one of the largest and most active clubs in
the region. The Lions serve the community through major projects, providing ongoing services in the
community, and donations to local charitable organizations.
T
he Lions Mission Statement is:
To create and foster a spirit of understanding among the people for humanitarian needs by providing
voluntary services through community involvement and international cooperation.
3)
. Describe the top 5-10 projects that the Lions have spearheaded or have been a major supporter.
Major Projects
Stayer Park
In September 2016, the Plymouth Lions Club shared a vision for our Club’s most ambitious
community service project to date, nicknamed “Dare to Dream. ” As part of the City’s Mullet
Corridor project, the Plymouth Lions helped to build a playground in Stayer Park that is inclusive
for children of all ages.
Li
ons Park
Lions Park was built in 1992 and is considered a jewel of a baseball park for youth in our
community and the surrounding area. Lions Club continues to watch over and contribute to some
aspect of the park due to our sense of responsibility for it and as an honoring of our past members
whose efforts created this mecca for youth baseball. In 2025, the club conducted a major
renovation of the baseball facilities.
Community Services
Reading Machines
One of the ways our club puts our mission into action is by providing Reading Machines for those
in need. The Reading Machine project started in the 1990’s with basic black and white machines.
Today, our club can provide over 50 machines of various types.
V
ision Screening
The Lions provide vision screening for students in 4K,kindergarten, first, third and fifth grades, in
addition to any students referred by staff or parents. The club uses a Welch Allen Spot Vision
Screener, a high-tech handheld machine that quickly and accurately detects vision issues.
B
lood Drives
The Lions promote Blood drives in the Plymouth community. By donating blood at one of our
drives, you become part of a life-saving plan in the lives of friends, family members, and
neighbors.
C
haritable Donations
The Lions Clubs sponsors four Scholarship every year to graduating seniors. We also sponsor the
annual PHS Academic Banquet. Other recent donations to initiatives in the Plymouth area
include:
• Nut Hill Development Project
• Project Angel Hugs
• Plymouth Educational Foundation Horizon
• Parkview Elementary School
• Plymouth Gift of Life
• Plymouth Chamber of Commerce
• Police and Fire Dept Programs
• Camp Anokijig
• Plymouth Arts Center
• Quit Qui Oc Athletic Association
CITY OF PLYMOUTH, WISCONSIN
TUESDAY, APRIL 14, 2026 COMMITTEE OF THE WHOLE MEETING,
COUNCIL CHAMBERS, ROOM 302
CITY HALL, 128 SMITH STREET
OFFICIAL MINUTES
1. Call to Order and Roll Call: Mayor Pohlman called the meeting to order. On the call of
the roll, the following were present: Angie Matzdorf, Diane Gilson, Mike Penkwitz, John
Binder, Jeff Tauscheck, Dave Herrmann, Dana Haucke and Kevin Sande. Also present:
City Administrator/Utilities Manager Tim Blakeslee, Director of Public Works Cathy
Austin, Police Chief Ken Ruggles, and City Clerk/Deputy Treasurer Anna Voigt.
2. Approve the Minutes from March 31, 2026: Motion was made by Gilson/Sande to
approve the minutes for March 31. A unanimous aye vote was cast. Motion carried.
3. Discussion on Ordinance 7 of 2026: Repealing and Recreating Ordinance Title 8
Chapter 3 Related to Refuse Disposal and Collection: Director Austin explained the
ordinance updates are to incorporate the DNR’s revised recycling ordinance. Pohlman
asked if the average residential user will see a rise in fees. Austin stated no not from this
Ordinance. Binder stated that he hopes compost will be added to 8-3-5 in the future.
4. Discussion on Dog Park Improvement Donation Project: Gentine presented and
updated the committee on the dog park project. The Plymouth Downtown Arts and
Merchants have partnered with Plymouth Advancement Association. Sande asked if the
EWF product is permeable. Gentine stated that part of the reason you use EWF is that
everything goes down, but he isn’t certain what the soils are underneath. Gilson asked how
often the chips had to be replaced. Gentine explained it had to be top dressed every few
years. Binder asked if there is a concern of the dog park being crowded. Blakeslee stated
that if it becomes to crowded the City will make changes. Matzdorf asked how long the
park would be closed during construction. Gentine thought it would be for about 2 months.
Matzdorf suggested starting to spread the word now. Gilson asked who will be maintaining
the park. Blakeslee stated that the City currently maintains it. The Plymouth Advancement
Association would do the project and donate it back to the City. Committee encouraged the
Plymouth Advancement Association to move forward with the project.
5. Discussion on Sign Code related to Projecting Signs: Blakeslee explained that part of
the Henry Christopher Hotel project at the former 52 Stafford hotel, the developers have
proposed two projecting signs for the property. The two signs proposed do not meet code.
Staff gave a few options: revising projecting sign ordinance to allow larger signs and
internal illumination, including differentiating projecting signs from marquee signs in the
ordinance, or creating special exception language for sign applications. The committee
directed staff to take it to Plan Commission.
6. Adjourn: Motion was made by Matzdorf/Binder to adjourn the meeting. A unanimous aye
vote was cast. Motion carried.
Page
1
of
2
The Plymouth Dog Park
–
Basic
Specifications
F
or
additional information
, design intent, or general questions, please contact FoxCatcher Designs.
Keynote demarcations such as
“
A01
”
reference the
Site Pla
n
, page
C
01
,
of the
Plan
Set.
This document is prepared on behalf of the Plymouth Advancement Association
(PAA)
.
Additional questions
, pricing,
an
d
all final
approvals
shall be
directed through the PAA
and its representatives.
Site Improvements
-
Surfaces
•
Engineered Wood (
“
Woof
”
) Fiber
–
Primary
Dog Park Surface
o
Approximate square footage of 5,295 sq.ft.
o
Design Intent: Model
ed based on the
‘
Woof
Fi
ber
’
product offered by
Dog
-
On
-
It.
o
Follow manufactures recommendations for product depth
.
•
G
ift
Brick
/
Donation Walk (A01
)
o
Appr
oximate square footage of 230 sq.f
t.
o
P
a
vers
donated
/
purchased
by the general public
in support of
Dog Park fundraising.
o
Pavers
shall be
installed b
y
Landscape
Sub
-
Cont
ractor.
o
Blank pavers shall be installed
in
-
lieu of donated pavers as required to fill walkway
.
▪
Blank pavers shall be replaced with donated pavers as they
become
available
.
o
P
a
ver
color
s
shall compl
e
ment
existing concrete and asphalt surfaces of Stayer Jr.
Park.
o
C
onnects
to existing asphalt (E07) at base of existing bridge (E03)
•
Concrete Patio / Pad (A03)
o
Approximate square footage of 336 sq.ft.
o
Poured c
o
ncrete
flatwork
shall
complement
existing
concrete surfaces of Stayer Jr. Park.
o
Min
imum
4
”
thickness.
Thickened edges may be necessary where
the
concrete meets
the
engineered
wood fiber
surface of the
Dog Park.
•
Crushed Gravel/Limestone Pathway
(
A15)
o
Approximate square footage of
416 sq.
ft.
o
Walkway to provide
access
to existing park bench
o
C
onnects
to existing asphalt (E07) at base of existing bridge (E03)
Site Improvements
–
Water
•
Potable Wa
ter from local Hyd
rant
to Drinking Fountain
o
Approximate distance from existing hy
drant to Drinking Fountain is 160 feet.
o
Design Intent: Modeled based on
‘
Elkay ezH2O Outdoor Bottle Filler w/Drinking Fountain & Pet Station
”
▪
Model #
WBB
729414
▪
Model number may vary based on free
ze
-
resistant feature
–
freeze
resistan
ce
shall be included
▪
Color T.B.D.
Site Improvements
–
Plantings
•
Mature Trees
w.
Perman
ent Decorative
Pet
Guard
Collars
(A10)
o
(6) mature trees, location per plan, shall be spa
de
-
in.
o
Type T.B.D.
–
shall
provide adequate shade and minimal ground litter / pet choking hazards
o
Account for trees being plante
d prior to concrete fence curb
installation
(
A12)
o
See attached renderings for examples of the pet guard collar
▪
Design Intent: Metal, corrosion re
sistant, with proper width & height
to protect tree trunks from damage
•
Mature Bushes & Sh
rubs
o
Type T.B.D.
–
shall
provide dense foliage to
prevent
pets from running to fence corners at
-
speed
•
Grass
o
Repair
and restore
any grass sur
faces damaged during construction
Page
2
of
2
General Improvements
•
Per
imeter Fencing
w. Conc
rete Curb/Frost Footing
o
The approximate length of fencing and concrete cur
b, as drawn per plan, is 354 feet.
o
The height of the concrete curb shall
be
a minimum of 6
”
above the top of the finished Engineered Wood Fiber
Primary Park Sur
face
▪
This height shall be coordinated be
tween the Landscape
,
Concrete
,
and Survey partners.
o
The width
of the concrete curb
shall be coordinated
between
the concrete provider and the fencing provider to
ensure that fence post
s
can be affixed to, or embedded in, the curb
without risk to damaging the curb
o
The
curb shall be
protected from frost heave by an
appropriate footing
/foundation depth, or by other approved,
equitable means
o
Fencing sh
all be set on, or affi
xed to, the top of the curb
▪
Design Intent: The current design of the fence is for black
-
coated chain link
▪
Design Intent: The current height of th
e
fence
is
modeled as 3
’
-
6
”
above the top of the curb. If 4
’
height
fencing is standard,
please verify
approval with the PAA.
o
Gates
(
A
13 &
A14
) shall be provided per plan.
▪
The width of
Mai
ntenance Gates (
A14) shall be coordinated with the Landscape partner
& the City of
Plymouth
to ensure a
ccess
for general maintenance,
the application of the
Engineered
Wood Fiber
Surf
ace
, and all other necessary park serv
ices.
▪
Entrance Gates (
A13) shall be self
-
closing
to create a double
-
gated entry for park
patrons.
•
Dog Park Shelter
o
See page A 06 of the Plan Set for Section drawings indicating the Design Intent for the Shelter structure.
o
Overall Design Int
ent as of the Plan Set dated 2026.01.30 is as follows:
▪
Tube
-
Steel
Post,
Beam
, and Purl
in
Construction to match
the
fit
& finish of the existing Stayer Jr. Park
Band Shelter
▪
2
x6 To
ngue
&
Groove (T&G)
roof decking, exposed
& visible
to the underside
of the roof system
▪
Metal Roofing to match the fit & fini
sh
of the existing Stayer Jr. Park Band Shelter
▪
Decorative Signage to match the fit & finish of the
“
Che
ese Capital
”
arch sign located on Eastern Ave. in
Plymout
h
, over the Mullet River
(i.e.
‘
Cheese
’
colored le
t
tering on a black background)
o
Provide
LED
lighting under the
shelter roof structure
o
Provide LED illumination of the Decorative Signage
•
Curved Bench Seating w. Backrest
o
Concrete
seat base
, which
shall be
protected from frost heave by an
appropriate footing
/foundation depth, or
by other approved, equitable means
o
Back
rest material shall be made of rot
-
resistant wood, or equitable materials approved by the PAA
o
The ba
ckrest support
s
are modeled as
tube
-
stee
l, powder coated black
•
General
H
uman Accommodations
o
(2) picnic tables
o
Pet
waste bag station
o
Pet waste and general waste
receptacle
•
General Pet Accommodations
o
Agility Equipme
nt
(A07)
▪
Modeled Agility
E
quipment
,
number of pieces, and locations are
for
visualization purposes only.
▪
Equipment providers shall provide
recommendation
s of equipment based on the size of the Dog Park
,
and shall seek approval
from
, and provide pricing estimates to,
the PAA
.
o
Decorative Fire Hydrants (A09)
A01
A02
A03
A04
A05
A06
A06
A07
A07
A07
A07
A08
A08
A09
A09
A09
A09
A10
A10
A10
A10
A10
A10
A11
A11
A11
E01
E01
E02
E02
E03
E04
E04
E04
E04
E05
E05
E06
E05
A12
A12
A12
A12
A12
A13
A13
A14
A15
E05
E07
E07
E07
EXTENSION FROM EXIST.
20' - 6" MATCHES EXISTING FOOTPRINT
60' - 10"
81' - 4"
26' - 2"
APPRX. 160' WATER RUN FROM EXISTING HYDRANT LOCA
TION
MATCHES EXISTING FOOTPRINT
55' - 11"
9' - 10"
99' - 8"15' - 7"
9' - 7"
E01
E01
R9' - 0" 20' - 10"
23' - 8"
9' - 11"
13' - 0"
8' - 5"
130°
90°
134°
144°
90°
97°
FACETED CURVE TO ACCOMMODATE FENCING
(TYP. AT RADIUS WALLS)
FOXCATCHER DESIGNS EXPRESSLY RESERVES THEIR COMMON LAW
COPYRIGHT & OTHER PROPERTY RIGHTS IN THESE DOCUMENTS. THESE
DOCUMENTS ARE NOT TO BE REPRODUCED, CHANGED, OR COPIED IN
ANY FORM OR MANNER WHATSOEVER. NOR ARE THEY TO BE ASSIGNED
TO ANY THIRD PARTY WITHOUT FIRST OBTAINING THE EXPRESS WRITTEN
PERMISSION & CONSENT OF FOXCATCHER DESIGNS.
WRITTEN DIMENSIONS ON THESE DOCUMENTS SHALL HAVE PRECEDENCE
OVER SCALED DIMENSIONS. CONTRACTORS SHALL VERIFY & BE
RESPONSIBLE FOR ALL DIMENSIONS & CONDITIONS ON THE JOB.
WHEN PLANS ARE PRINTED ON 12 x 18 PAPER,
DRAWINGS ARE REDUCED BY 50%
PROJECT #:
IF PRINTED ON 24" X 36", TOP SCALE BAR SHALL BE EXACTLY 1".
IF PRINTED ON 12" X 18", BOTTOM SCALE BAR SHALL BE EXACTLY 1", AND VIEWS ON THE SHEET ARE REDUCED BY 50%.
IF EITHER SCALE BAR IS NOT EXACTLY 1", DRAWING IS NOT TO SCALE
0" 1"
0" 1"
24 X 36
12 X 18
TRUE
NORTH
PLAN
NORTH
NOT FOR CONSTRUCTION NOT FOR CONSTRUCTIONNOT FOR CONSTRUCTION NOT FOR CONSTRUCTION NOT FOR CONSTRUCTION
PRELIMINARY
DRAWINGS
DEVON REGAN
(920) 226-7690
devon@foxcatcherdesigns.com
THESE PLANS, AS DRAWN BY FOXCATCHER DESIGNS, ARE NEITHER INTENDED FOR USE AS, NOR TO BE CONSTRUED AS,
LICENSED COMMERCIAL DRAWINGS. THEY ARE FOR DESIGN INTENT AND REFERENCE PURPOSES ONLY.
PLAN NOTES:
FOLLOW THE QR CODE TO:
www.foxcatcherdesigns.com
C 01
PLYMOUTH DOG
PARK
39 S STAFFORD ST,
PLYMOUTH, WI 53073
SITE PLAN
2025.09
SITE PLAN -
3/16" = 1'-0"1
PLYMOUTH DOG PARK
PLYMOUTH DOG PARK LEGEND - NEW DESIGN ELEMENTS
KEY NOTE DESCRIPTION
A01 GIFT BRICK - DONATION WALK
A02 SHELTER STRUCTURE
A03 CONCRETE PATIO
A04 PICNIC TABLES
A05 DRINKING FOUNTAIN & BOTTLE FILLER
A06 WASTE BAGS & DISPOSAL BIN
A07 AGILITY EQUIPMENT (TYPICAL) OVER ENGINEERED WOOD
FIBER SURFACE
A08 CURVED BENCH w. BACKREST
A09 FIRE HYDRANT (TYPICAL)
A10 MATURE TREES w. PET COLLARS
A11 MATURE BUSHES & SHRUBS
A12 NEW PARK PERIMETER - CONCRETE CURB w. DECORATIVE
FENCING SET ON TOP
A13 SELF CLOSING GATES
A14 MAINTENANCE GATES
A15 NEW CRUSHED LIMESTONE WALKWAY
STAYER JUNIOR PARK - EXISTING ELEMENTS
KEY NOTE DESCRIPTION
E01 PERIMITER OF EXISTING DOG PARK
E02 EXISTING BENCH(ES) (TYPICAL)
E03 EXISITNG BRIDGE
E04 EXISTING TREE(S) (TYPICAL)
E05 EXISTING MECHANICAL/ELECTRICAL EQUIPMENT
E06 EXISTING PARKING STRUCTURE
E07 EXISTING PATHWAYS & PARKING
# DATE DESCRIPTION
1 2025.11.24 PRELIM. PLANS
2 2026.01.30 PRELIM REV. 01
3 2026.01.30 PRELIM REV. 02
PLYMOUTH DOG PARK - QUICK STATS:
EXISTING FENCED OUTER PERIMETER: ≈ 289'
(OUTER PERIMETER DOES NOT ACCOUNT FOR FENCING REQUIRED TO CREATE DOUBLE-GATED ENTRY AREA)
EXISTING PARK AREA: 4,787 SQ. FT.
(INCLUDING DOUBLE-GATED ENTRY AREA)
NEW FENCED OUTER PERIMETER: ≈ 329'
(OUTER PERIMETER DOES NOT ACCOUNT FOR FENCING REQUIRED TO CREATE DOUBLE-GATED ENTRY AREA)
TOTAL APPROX. FENCING LENGTH: ≈ 354'
NEW PARK AREA: 5,842 SQ. FT.
(INCLUDING DOUBLE-GATED ENTRY AREA)
NEW ENGINEERED 'WOOF' FIBER ≈ 5,295 SQ. FT.
(USED IN-LIEU OF GRASS OR TURF)
NEW GIFT BRICK AREA (A01): ≈ 230 SQ. FT.
NEW CONCRETE PATIO AREA (A03): ≈ 336 SQ. FT.
NEW CRUSHED GRAVEL AREA (A15): ≈ 416 SQ. FT.
Source: City of Plymouth website. First collected Oct 14, 2026.