Waupun Utilities Commission
City of Waupun · Fond du Lac County · meeting of Oct 12, 2026 · Agendas
Open the original document More from City of Waupun
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
A G E N D A
WAUPUN UTILITIES COMMISSION MEETING
817 S. Madison Street
Monday, October 12, 2026 at 4:00 PM
There is a regular commission meeting scheduled for Monday, October 12, 2026 at 4:00 p.m. at the Waupun
Utilities Administrative Building, with an option to join virtually or by teleconference. Instructions to join the
meeting are provided below:
Join Zoom Meeting
https://us02web.zoom.us/j/89819520743?pwd=amNEeGRJTzBNaVdhUHhpcUdDNGNwdz09
By Phone: 1 312 626 6799
Meeting ID: 898 1952 0743
Passcode: 061341
CALL TO ORDER
ROLL CALL OF COMMISSIONERS
PERSONS WISHING TO ADDRESS COMMISSION - State name, address, and subject of comments (2 Minutes)
CONSIDERATION – ACTION
1. Approval of Minutes from September 14, 2026
2. Approval of September 2026 Accounts Payable
3. Finance Director Report and Approval of Monthly Financial Results
4. Review and Award of Construction Contract for Storage Building
5. Waupun Utilities Employee Wellness Program Policy – New Policy
6. 2026 Water Utility Budget Amendment
DISCUSSION - REVIEW
7. Waupun Utilities Compensation for Standby Policy – Revisions
8. Cell Phone Reimbursement Policy
9. Utility Tech/Contracting Locates
10. Review of 2027 Preliminary Budget
DEPARTMENT REPORTS
11. General Manager Report
12. Electric Operations Report
13. Treatment Facilities Report
14. Water and Sewer Operations Report
15. Energy Services Manager Report
ADJOURNMENT
Upon reasonable notice, efforts will be made to accommodate disabled individuals through appropriate aids and
services. For additional information, contact the General Manager at 920-324-7920.
Minutes of a Regular Meeting of the
Waupun Utilities Commission
Monday, September 14, 2026
Meeting called to order by President Heeringa at 4:00 p.m.
Present: Commissioners Daane, Heeringa, Homan, Mielke, Siebers, and Thurmer
Absent with notice: Commissioner Kunz
Michael Miller (virtual) present as a visitor.
Motion made by Thurmer, seconded by Daane, and unanimously carried to approve the minutes
from the August 10, 2026 meeting.
Motion by Siebers, seconded by Daane, and unanimously carried to approve the bills for the
month of August 2026 as presented.
On motion by Mielke, seconded by Homan, and unanimously carried, year-to-date financial
reports through July 2026 were approved as presented by Finance Director Stanek. Electric
operating income was $503,400. Water operating income was $334,000. Sewer operating income
was $44,900.
General Manager Brooks provided information regarding an opportunity for the Utility to
participate in a WPPI member group filing pertaining to PGS1 rates. The PGS1 tariff change
would change the rate paid for solar generation received. The current payback is at retail rates,
and filing would allow the Utility to pay back at wholesale rates, helping to protect our
ratepayers from the costs associated with additional solar generation. On motion by Siebers,
seconded by Homan, and unanimously carried, the Commission approved the PGS1 tariff group
filing with PSCW.
General Manager Brooks provided an update regarding the substation transformer. Staff have
found a suitable replacement transformer; however, they are waiting to proceed with acquisition
until the insurance company has given approval.
General Manager Brooks presented highlights from his monthly report, including budget
preparation, attendance at the WPPI strategic planning session, upcoming meetings and
conferences, and plans for Public Power Week. WPPI recently filed for ownership stake in the
Oak Creek Combustion Turbine Project, seeking to acquire an 8.33% ownership interest.
Electric Operations Superintendent Vande Kolk reported on outages and current projects,
including pole replacements, development planning, the alleyway project, installation of new
street lights, and GIS mapping updates. Detailed GIS maps will be printed and ready for use in
the event of an emergency when electronic maps are not accessible.
Treatment Facilities Superintendent Sytsma reported that the water and wastewater treatment
facilities are operating well with consistent flows and no call-ins to report. Staff continue to
participate in training and certification programs, and the new operator is being trained on
Waupun Utilities Commission
September 14, 2026 Meeting Minutes
Page 2
Waupun Utilities’ processes. Staff are also addressing intermittent wastewater treatment facility
alarms and continuing maintenance and improvement efforts.
General Manager Brooks provided a brief overview of the Water and Sewer Operations Report,
noting that staff are keeping up with annual maintenance on the water and sanitary sewer
systems in addition to other ongoing projects.
Motion by Siebers, seconded by Homan, and unanimously carried to adjourn the meeting at 4:55
p.m.
The next regular commission meeting will be held on October 12, 2026, at 4:00 p.m.
Jen Benson
Office & Customer Service Supervisor
WAUPUN UTILITIES Paid Invoice Report - COMMISSION Page: 1
Check issue dates: 9/1/2026 - 9/30/2026 Oct 05, 2026 01:58PM
Vendor Invoice Invoice Invoice Check Check Check
Number Number Description Date Amount Amount Number Issue Date
AIR PRODUCTS AND CHEMICALS INC
840 436256981 CARBON DIOXIDE - ABNR (41320 LBS) 09/10/2026 5,581.81 5,581.81 1205 09/10/2026
Total AIR PRODUCTS AND CHEMICALS INC: 5,581.81 5,581.81
AIRGAS USA INC
855 5526897539 ACETYLENE/OXYGEN/NITROGEN-E 09/30/2026 69.62 69.62 51374 09/30/2026
5526897539 ACETYLENE/OXYGEN/NITROGEN-W 09/30/2026 69.62 69.62 51374 09/30/2026
5526897539 ACETYLENE/OXYGEN/NITROGEN-S 09/30/2026 69.61 69.61 51374 09/30/2026
Total AIRGAS USA INC: 208.85 208.85
ALLIANT ENERGY
900 183035.08312026 GAS UTILITY - WATER PLANT 09/10/2026 130.39 130.39 91020261 09/10/2026
3261389217.08312WWTF- PROCESS BLD, GREEN HOUSE AND PUMP BLD 09/10/2026 114.57 114.57 91020261 09/10/2026
4370000.08312026 GAS UTIL BILL @ N2721 FDL ST - ADMIN/DIGESTER BLD 09/10/2026 179.56 179.56 91020261 09/10/2026
590516.08312026 SPLIT DISTRIBUTION- MAIN BLD - 5% E 09/10/2026 3.01 3.01 91020261 09/10/2026
590516.08312026 SPLIT DISTRIBUTION- MAIN BLD - 4% W 09/10/2026 2.41 2.41 91020261 09/10/2026
590516.08312026 SPLIT DISTRIBUTION- MAIN BLD - 4% S 09/10/2026 2.41 2.41 91020261 09/10/2026
590516.08312026 SPLIT DISTRIBUTION- MAIN BLD - 27% W 09/10/2026 16.27 16.27 91020261 09/10/2026
590516.08312026 SPLIT DISTRIBUTION- MAIN BLD - 27% S 09/10/2026 16.27 16.27 91020261 09/10/2026
590516.08312026 SPLIT DISTRIBUTION- MAIN BLD - 27% E 09/10/2026 16.27 16.27 91020261 09/10/2026
590516.08312026 SPLIT DISTRIBUTION- MAIN BLD - 2% W 09/10/2026 1.21 1.21 91020261 09/10/2026
590516.08312026 SPLIT DISTRIBUTION- MAIN BLD - 2% S 09/10/2026 1.21 1.21 91020261 09/10/2026
590516.08312026 SPLIT DISTRIBUTION- MAIN BLD - 2% E 09/10/2026 1.21 1.21 91020261 09/10/2026
80105.08312026 GAS UTILITY FOR WELLHOUSE #5 09/10/2026 14.70 14.70 91020261 09/10/2026
931084.08312026 GAS UTIL @ N2721 FDL ST - FILTER & DEWATERING BLD 09/10/2026 29.30 29.30 91020261 09/10/2026
Total ALLIANT ENERGY: 528.79 528.79
AMAZON CAPITAL SERVICES
1015 1HTW-3V7G-CG97 HI-VIS SHIRTS FOR ELEC CREW 09/30/2026 52.24 52.24 1220 09/30/2026
1HTW-3V7G-CG97 BLUE SHOP TOWELS 09/30/2026 94.97 94.97 1220 09/30/2026
1N9F-HNLJ-3H9P THANK YOU CARDS 09/30/2026 5.46 5.46 1220 09/30/2026
1N9F-HNLJ-3H9P THANK YOU CARDS 09/30/2026 4.33 4.33 1220 09/30/2026
1N9F-HNLJ-3H9P THANK YOU CARDS 09/30/2026 4.20 4.20 1220 09/30/2026
1YF6-K6R4-CPN1 DONATION ITEM - WAUPUN HOCKEY 09/30/2026 34.19 34.19 1220 09/30/2026
Total AMAZON CAPITAL SERVICES: 195.39 195.39
AT&T MOBILITY
1560287362417474X082CELLPHONE MONTHLY EXPENSES-S 09/10/2026 80.52 80.52 91020262 09/10/2026
287362417474X082CELLPHONE MONTHLY EXPENSES-E 09/10/2026 130.58 130.58 91020262 09/10/2026
287362417474X082CELLPHONE MONTHLY EXPENSES-W 09/10/2026 81.01 81.01 91020262 09/10/2026
Total AT&T MOBILITY: 292.11 292.11
B & M TECHNICAL SERVICES INC.
2012 14236 WTF - RESERVOIR LEVEL PRESSURE TRANSDUCER 09/30/2026 1,606.50 1,606.50 51375 09/30/2026
Total B & M TECHNICAL SERVICES INC.: 1,606.50 1,606.50
BENTZ AUTOMOTIVE INC
2800 38019 #146 OIL CHANGE & TIRES 09/30/2026 501.95 501.95 1221 09/30/2026
38019 #146 OIL CHANGE & TIRES 09/30/2026 501.94 501.94 1221 09/30/2026
38065 #156 OIL CHANGE 09/30/2026 281.14 281.14 1221 09/30/2026
WAUPUN UTILITIES Paid Invoice Report - COMMISSION Page: 2
Check issue dates: 9/1/2026 - 9/30/2026 Oct 05, 2026 01:58PM
Vendor Invoice Invoice Invoice Check Check Check
Number Number Description Date Amount Amount Number Issue Date
Total BENTZ AUTOMOTIVE INC: 1,285.03 1,285.03
BISHOP, ROHN
29402026 WPPI ANNUA GOVERNING BODY SCHOLARSHIP FOR ATTENDANCE O 09/30/2026 378.00 378.00 51376 09/30/2026
Total BISHOP, ROHN: 378.00 378.00
BOARDMAN & CLARK LLP
3200 322538 PROFESSIONAL SERVICES-POLE AGREEMENTS 09/30/2026 3,840.50 3,840.50 1222 09/30/2026
323600 PROFESSIONAL SERVICES - POLE AGREEMENTS 09/30/2026 1,859.00 1,859.00 1222 09/30/2026
Total BOARDMAN & CLARK LLP: 5,699.50 5,699.50
BORDER STATES ELECTRIC SUPPLY
3300 933106875 ARRESTOR OH ALL-APPLICATIONS 10KV HD (40) 09/30/2026 2,596.00 2,596.00 1223 09/30/2026
Total BORDER STATES ELECTRIC SUPPLY: 2,596.00 2,596.00
BROOKS SHOES & REPAIR
3550 58717 SAFETY BOOTS FOR BEN SMITH 09/10/2026 175.00 175.00 1206 09/10/2026
58882 SAFETY BOOTS - RYAN HOFFMAN 09/30/2026 87.50 87.50 1224 09/30/2026
58882 SAFETY BOOTS - RYAN HOFFMAN 09/30/2026 87.50 87.50 1224 09/30/2026
Total BROOKS SHOES & REPAIR: 350.00 350.00
C. VERHAGE PHOTO LLC
5200 SS-00064-001 EMPLOYEE BADGES - BRANDNER 09/30/2026 60.00 60.00 51377 09/30/2026
SS-00064-001 EMPLOYEE BADGES - WESTFIELD 09/30/2026 30.00 30.00 51377 09/30/2026
SS-00064-001 EMPLOYEE BADGES - WESTFIELD 09/30/2026 30.00 30.00 51377 09/30/2026
Total C. VERHAGE PHOTO LLC: 120.00 120.00
CAPELLE BROS. & DIEDRICH INC.
5350 WWTP CANOPYREPAIR DAMAGED CANOPY - WWTP (OFFSET INSURE R 09/30/2026 44,625.00 44,625.00 51378 09/30/2026
Total CAPELLE BROS. & DIEDRICH INC.: 44,625.00 44,625.00
CAPORALE, RITA
5515 17058431-020 REF OVERPAYMT FRM: 103 S HARRIS AVE APT A 09/30/2026 137.43 137.43 1225 09/30/2026
Total CAPORALE, RITA: 137.43 137.43
CAREW CONCRETE & SUPPLY CO
5600 1345407 AG- 3/4" CRUSHER (QTY 68T) 09/10/2026 546.16 546.16 1207 09/10/2026
Total CAREW CONCRETE & SUPPLY CO: 546.16 546.16
COLUMN SOFTWARE PBC
6115 A1CF33FA-0030 MNTHLY MEETING MINS-E 09/30/2026 43.66 43.66 1227 09/30/2026
A1CF33FA-0030 MNTHLY MEETING MINS-W 09/30/2026 34.71 34.71 1227 09/30/2026
A1CF33FA-0030 MNTHLY MEETING MINS-S 09/30/2026 33.59 33.59 1227 09/30/2026
Total COLUMN SOFTWARE PBC: 111.96 111.96
CORE & MAIN LP
6310 Z333921 INFLUENT VALVE REPAIR - FILTER #2, CELL #1 - WTF 09/30/2026 725.00 725.00 1228 09/30/2026
WAUPUN UTILITIES Paid Invoice Report - COMMISSION Page: 3
Check issue dates: 9/1/2026 - 9/30/2026 Oct 05, 2026 01:58PM
Vendor Invoice Invoice Invoice Check Check Check
Number Number Description Date Amount Amount Number Issue Date
Z635291 1" IPEARL WATER METER (3) 09/10/2026 504.00 504.00 1209 09/10/2026
Z755445 DROP IN METER GASKETS (48) 09/30/2026 105.51 105.51 1228 09/30/2026
Total CORE & MAIN LP: 1,334.51 1,334.51
CT LABORATORIES
6610 207287 WATER PLANT TESTING 09/30/2026 1,460.00 1,460.00 1229 09/30/2026
Total CT LABORATORIES: 1,460.00 1,460.00
DAANE, NATE
7000 3RD QTR 2026 COMMISSION MEETINGS-E 09/10/2026 38.00 38.00 51359 09/10/2026
3RD QTR 2026 COMMISSION MEETINGS-W 09/10/2026 31.00 31.00 51359 09/10/2026
3RD QTR 2026 COMMISSION MEETINGS-S 09/10/2026 31.00 31.00 51359 09/10/2026
Total DAANE, NATE: 100.00 100.00
DEVRIES WELDING LLC
7100 03173 BALLARDS: PROTECTION OF EQUIPMENT (12) 09/10/2026 1,087.50 1,087.50 51360 09/10/2026
03173 BALLARDS: PROTECTION OF EQUIPMENT (12) 09/10/2026 1,087.50 1,087.50 51360 09/10/2026
Total DEVRIES WELDING LLC: 2,175.00 2,175.00
DIGGERS HOTLINE INC.
7300 360831801 MONTHLY LOCATE TICKET CHRGS 09/30/2026 195.70 195.70 51379 09/30/2026
Total DIGGERS HOTLINE INC.: 195.70 195.70
DISCH, DOUG
7430 2026 EV REBATE EV REBATE 09/30/2026 250.00 250.00 51380 09/30/2026
Total DISCH, DOUG: 250.00 250.00
DULTMEIER SALES LLC
7770 4397739 UNIT 103 HOSE 09/30/2026 59.01 59.01 51381 09/30/2026
4397739 UNIT 103 HOSE 09/30/2026 59.01 59.01 51381 09/30/2026
4397739 UNIT 103 HOSE 09/30/2026 59.00 59.00 51381 09/30/2026
Total DULTMEIER SALES LLC: 177.02 177.02
EDMUNDS, CAROL
7910 20083102-022 REF OVERPAYMT FRM:22 PLUIM DR APT 23 09/30/2026 33.23 33.23 1230 09/30/2026
Total EDMUNDS, CAROL: 33.23 33.23
ENVISION GREATER FOND DU LAC
85202026 CERTIFICATE2026 GIFT CERTIFICATES (10) $10, (10) $20 09/30/2026 300.00 300.00 51382 09/30/2026
GIFT CERTIFICATEFUNDRAISER DONATION CERTIFICATES 09/30/2026 100.00 100.00 51382 09/30/2026
Total ENVISION GREATER FOND DU LAC: 400.00 400.00
EWALD CHEVROLET TRUCK LLC
8959DEAL #51534/26CFUTILITY BODY TRUCK UNIT #171 09/10/2026 70,363.50 70,363.50 1210 09/10/2026
DEAL #51535/26CFUTILITY BODY TRUCK UNIT #172 09/10/2026 70,363.50 70,363.50 1210 09/10/2026
Total EWALD CHEVROLET TRUCK LLC: 140,727.00 140,727.00
WAUPUN UTILITIES Paid Invoice Report - COMMISSION Page: 4
Check issue dates: 9/1/2026 - 9/30/2026 Oct 05, 2026 01:58PM
Vendor Invoice Invoice Invoice Check Check Check
Number Number Description Date Amount Amount Number Issue Date
MARTENS ACE HARDWARE
9200 252954 BLUE SPRAY PAINT 09/30/2026 119.90 119.90 1245 09/30/2026
253011 FASTENERS FOR TRUCK #25 09/30/2026 1.88 1.88 1245 09/30/2026
253207 ELECTRIC VEHICLE TOOLS #171 & #172 09/30/2026 30.98 30.98 1245 09/30/2026
253284 PVC UNIT 171 & 172 09/30/2026 233.70 233.70 1245 09/30/2026
253284 DISTILLED WATER FOR SUBSTATIONS 09/30/2026 5.58 5.58 1245 09/30/2026
253351 FASTENERS FOR 171 & 172 09/30/2026 33.40 33.40 1245 09/30/2026
253378 NEW BOLTS FOR PED - ALLEY PROJECT 09/30/2026 4.94 4.94 1245 09/30/2026
253379 CABLES & STRAPS UNIT #6 09/30/2026 10.99 10.99 1245 09/30/2026
253379 CABLES & STRAPS UNIT #6 09/30/2026 10.99 10.99 1245 09/30/2026
253411 WTP - SUPPLIES FOR A NEW SENSOR IN RESERVOIR 09/30/2026 14.37 14.37 1245 09/30/2026
253449 RED & BLUE SPRAYPAINT 09/30/2026 71.94 71.94 1245 09/30/2026
Total MARTENS ACE HARDWARE: 538.67 538.67
FORSTER ELECTRICAL ENGINEERING
9885 28041 NEW BUSINESS PARK SUB - ENGINEERING 09/30/2026 20,263.75 20,263.75 1231 09/30/2026
28042W08-26A - TRANSFORMER REWIND CAPABILITIES ANALY09/30/2026 2,635.00 2,635.00 1231 09/30/2026
Total FORSTER ELECTRICAL ENGINEERING: 22,898.75 22,898.75
FOX COMPUTER & NETWORKING INC
9920 340358 #150 SHIPPING REMOTE REPAIRS 09/30/2026 117.45 117.45 1232 09/30/2026
Total FOX COMPUTER & NETWORKING INC: 117.45 117.45
GFL ENVIRONMENTAL
11300 U90000340233 DUMPSTER - OFFICE BLDG-E 40% 09/30/2026 355.84 355.84 1233 09/30/2026
U90000340233 DUMPSTER - OFFICE BLDG-W 30% 09/30/2026 266.88 266.88 1233 09/30/2026
U90000340233 DUMPSTER - OFFICE BLDG-S 30% 09/30/2026 266.89 266.89 1233 09/30/2026
U90000340471 DUMPSTER - WWTP 09/30/2026 4,315.19 4,315.19 1233 09/30/2026
Total GFL ENVIRONMENTAL: 5,204.80 5,204.80
GORDON FLESCH COMPANY INC
11325 IN15757668 MTHLY CLICK COUNTS -E (39%) 09/30/2026 25.52 25.52 1234 09/30/2026
IN15757668 MTHLY CLICK COUNTS -W (31%) 09/30/2026 20.29 20.29 1234 09/30/2026
IN15757668 MTHLY CLICK COUNTS -S (30%) 09/30/2026 19.63 19.63 1234 09/30/2026
Total GORDON FLESCH COMPANY INC: 65.44 65.44
GRAINGER
11400 9057847429 FILTRATE MIX PUMP -WWTP 09/10/2026 310.55 310.55 1211 09/10/2026
9081864796WWTP - 2 GAL EXPANSION TANK CENTRIFUGE #2 REPAI09/30/2026 49.86 49.86 1235 09/30/2026
9087259645ABNR - BRACKET CLAMP ANHYDROUS SIGHT GLASS PA09/30/2026 232.35 232.35 1235 09/30/2026
Total GRAINGER: 592.76 592.76
GREEN IGNITE INC
11592 INV-010281 LED FIXTURE OPEN BOTTOM REPLACEMENTS - 45W (2309/10/2026 3,335.00 3,335.00 51361 09/10/2026
Total GREEN IGNITE INC: 3,335.00 3,335.00
GUELIG WASTE REMOVAL
11690 2653 RENTAL OF 20YD DUMPSTER - ELEC DEPT 09/10/2026 1,065.00 1,065.00 51362 09/10/2026
WAUPUN UTILITIES Paid Invoice Report - COMMISSION Page: 5
Check issue dates: 9/1/2026 - 9/30/2026 Oct 05, 2026 01:58PM
Vendor Invoice Invoice Invoice Check Check Check
Number Number Description Date Amount Amount Number Issue Date
Total GUELIG WASTE REMOVAL: 1,065.00 1,065.00
HARN R/O SYSTEMS INC.
12140 SINV-000265 WATER PLANT REVERSE OSMOSIS 1 & 2 PREFILTERS (109/30/2026 1,657.50 1,657.50 1236 09/30/2026
Total HARN R/O SYSTEMS INC.: 1,657.50 1,657.50
HEERINGA, JOE
12330 3RD QTR 2026 COMMISSIONERS QTRLY SALARY-E 09/10/2026 52.24 52.24 1212 09/10/2026
3RD QTR 2026 COMMISSIONERS QTRLY SALARY-W 09/10/2026 42.63 42.63 1212 09/10/2026
3RD QTR 2026 COMMISSIONERS QTRLY SALARY-S 09/10/2026 42.63 42.63 1212 09/10/2026
Total HEERINGA, JOE: 137.50 137.50
HOMAN, JEFF
12830 3RD QTR 2026 QTRLY COMMISSION SALARY-E 09/10/2026 38.00 38.00 1213 09/10/2026
3RD QTR 2026 QTRLY COMMISSION SALARY-S 09/10/2026 31.00 31.00 1213 09/10/2026
3RD QTR 2026 QTRLY COMMISSION SALARY-W 09/10/2026 31.00 31.00 1213 09/10/2026
Total HOMAN, JEFF: 100.00 100.00
HYDROCORP LLC
13985 CI-15540 CROSS CNNCTN CONTROL PROG & INSP (NON-RES) 09/30/2026 1,304.00 1,304.00 1237 09/30/2026
CI-15543CROSS CNNCTN CONTROL PROG & INSP (RESIDENTIAL)09/30/2026 950.00 950.00 1237 09/30/2026
Total HYDROCORP LLC: 2,254.00 2,254.00
ICS MEDICAL ANSWERING SERVICE LLC
14120 252200101101 ANSWERING SERVICE - E 09/30/2026 112.28 112.28 1238 09/30/2026
252200101101 ANSWERING SERVICE - W 09/30/2026 89.25 89.25 1238 09/30/2026
252200101101 ANSWERING SERVICE - S 09/30/2026 86.36 86.36 1238 09/30/2026
252300101101 ANSWERING SERVICE - E 09/30/2026 124.09 124.09 1238 09/30/2026
252300101101 ANSWERING SERVICE - W 09/30/2026 98.64 98.64 1238 09/30/2026
252300101101 ANSWERING SERVICE - S 09/30/2026 95.46 95.46 1238 09/30/2026
Total ICS MEDICAL ANSWERING SERVICE LLC: 606.08 606.08
INFOSEND INC
14490 317765 BILL PRINT & POSTAGE-E (39%) 09/30/2026 1,168.81 1,168.81 1239 09/30/2026
317765 BILL PRINT & POSTAGE-S (30%) 09/30/2026 899.08 899.08 1239 09/30/2026
317765 BILL PRINT & POSTAGE-W (31%) 09/30/2026 929.06 929.06 1239 09/30/2026
Total INFOSEND INC: 2,996.95 2,996.95
INSIGHT FS
14520 220000130 HERBICIDE SPRAY FOR MAIN BLD - E 40% 09/30/2026 23.57 23.57 1240 09/30/2026
220000130 HERBICIDE SPRAY FOR MAIN BLD - W 30% 09/30/2026 17.68 17.68 1240 09/30/2026
220000130 HERBICIDE SPRAY FOR MAIN BLD - S 30% 09/30/2026 17.68 17.68 1240 09/30/2026
Total INSIGHT FS: 58.93 58.93
STUART IRBY CO LLC
14890 S014528789.002 TRIPLEX SPREADER (40) 09/30/2026 2,838.00 2,838.00 1252 09/30/2026
S014689447.001 WEDGE CLAMPS (75) 09/30/2026 247.50 247.50 1252 09/30/2026
s014710958.001 CURVED WASHER (200) 09/30/2026 390.00 390.00 1252 09/30/2026
WAUPUN UTILITIES Paid Invoice Report - COMMISSION Page: 6
Check issue dates: 9/1/2026 - 9/30/2026 Oct 05, 2026 01:58PM
Vendor Invoice Invoice Invoice Check Check Check
Number Number Description Date Amount Amount Number Issue Date
Total STUART IRBY CO LLC: 3,475.50 3,475.50
IPSEN, JEANNE
14895 20086933-033 REF OVERPAYMT FRM: 120 GATEWAY DR 09/30/2026 18.27 18.27 1241 09/30/2026
Total IPSEN, JEANNE: 18.27 18.27
ITU ABSORB TECH INC.
14950 8792258 SHOP TOWELS MTHLY RENTAL FEE-E 09/30/2026 14.48 14.48 1242 09/30/2026
8792258 SHOP TOWELS MTHLY RENTAL FEE-W 09/30/2026 14.48 14.48 1242 09/30/2026
8792258 SHOP TOWELS MTHLY RENTAL FEE-S 09/30/2026 14.47 14.47 1242 09/30/2026
8792259 SHOP TOWELS FOR WWTP 09/30/2026 25.61 25.61 1242 09/30/2026
Total ITU ABSORB TECH INC.: 69.04 69.04
J & H CONTROLS INC
16000 10000028540 BUILDING PREVENTATIVE MAINT. - E 09/30/2026 209.20 209.20 1243 09/30/2026
10000028540 BUILDING PREVENTATIVE MAINT. - W 09/30/2026 156.90 156.90 1243 09/30/2026
10000028540 BUILDING PREVENTATIVE MAINT. - S 09/30/2026 156.90 156.90 1243 09/30/2026
Total J & H CONTROLS INC: 523.00 523.00
J HARLEN COMPANY INC
16150 1836582 RAIN JACKET & RAIN BIB FOR TYLER BRANDNER 09/30/2026 245.19 245.19 1244 09/30/2026
1836582 BOOTS - OWEN 09/30/2026 192.76 192.76 1244 09/30/2026
1836582 ELECTRICAL TOOLS 09/30/2026 55.58 55.58 1244 09/30/2026
1836714 SAFETY HARNESS (2) 09/30/2026 457.78 457.78 1244 09/30/2026
1836989 SAFETY HARNESS (2) 09/30/2026 457.78 457.78 1244 09/30/2026
Total J HARLEN COMPANY INC: 1,409.09 1,409.09
JUD-SONS, LLC
16740SHARED SAVINGS SHARED SAVINGS LOAN PAYMENT 2026 09/14/2026 8,512.00 8,512.00 51369 09/14/2026
Total JUD-SONS, LLC: 8,512.00 8,512.00
M. W. TIGHE ROOFING INC
19100 17486 BLD 15 - ROOF REPLACEMENT - WWTF 09/30/2026 46,378.00 46,378.00 51383 09/30/2026
17498 ROOF REPAIR DURING TEMP WTR INSTALL - 316 MAIN 09/30/2026 1,185.00 1,185.00 51383 09/30/2026
Total M. W. TIGHE ROOFING INC: 47,563.00 47,563.00
MACQUEEN EQUIPMENT LLC
19150 INV19889 UNIT #23 DEBRIS TUBE & HOSE END WELDMENTS 09/10/2026 1,021.91 1,021.91 1214 09/10/2026
INV19889 UNIT #23 DEBRIS TUBE & HOSE END WELDMENTS 09/10/2026 1,021.91 1,021.91 1214 09/10/2026
INV19889 UNIT #23 DEBRIS TUBE & HOSE END WELDMENTS 09/10/2026 1,021.90 1,021.90 1214 09/10/2026
Total MACQUEEN EQUIPMENT LLC: 3,065.72 3,065.72
MARTELLE WATER TREATMENT INC.
20250 31913 CHLORINE, SULFUR DIOXIDE, CAUSTIC SODA 50%, HYP09/30/2026 3,475.45 3,475.45 51384 09/30/2026
32465CHLORINE & HYDROFLUOSILCIC ACID BULK (FLUROIDE 09/30/2026 3,671.34 3,671.34 51384 09/30/2026
32466 SODIUM HYPOCHLORITE (BLEACH) - ABNR 09/30/2026 291.50 291.50 51384 09/30/2026
Total MARTELLE WATER TREATMENT INC.: 7,438.29 7,438.29
WAUPUN UTILITIES Paid Invoice Report - COMMISSION Page: 7
Check issue dates: 9/1/2026 - 9/30/2026 Oct 05, 2026 01:58PM
Vendor Invoice Invoice Invoice Check Check Check
Number Number Description Date Amount Amount Number Issue Date
MERGING COMMUNICATIONS LLC
23150 26-286 PHONE SYSTEM SUPPORT-E 09/30/2026 26.32 26.32 1246 09/30/2026
26-286 PHONE SYSTEM SUPPORT-W 09/30/2026 20.93 20.93 1246 09/30/2026
26-286 PHONE SYSTEM SUPPORT-S 09/30/2026 20.25 20.25 1246 09/30/2026
Total MERGING COMMUNICATIONS LLC: 67.50 67.50
MIDNIGHT RUN REPAIR LLC
24250 4524 UNIT #155 OIL CHANGE 09/10/2026 66.30 66.30 1215 09/10/2026
Total MIDNIGHT RUN REPAIR LLC: 66.30 66.30
MILLENNIUM
24750 26-163192-1 1" PETROFLEX CONDUIT (5,000) 09/30/2026 3,150.00 3,150.00 1247 09/30/2026
26-163192-1 SHIPPING ON 5,000' OF 1" PETRO 09/30/2026 737.50 737.50 1247 09/30/2026
Total MILLENNIUM: 3,887.50 3,887.50
SECURIAN FINANCIAL GROUP INC
2520002832L-1027 SepteBASIC GROUP LIFE INS PREMIUM 09/30/2026 308.28 308.28 51388 09/30/2026
02832L-1027 SepteEMPLOYER CONTRIBUTION 20%-E 09/30/2026 17.06 17.06 51388 09/30/2026
02832L-1027 SepteEMPLOYER CONTRIBUTION 20%-W 09/30/2026 13.56 13.56 51388 09/30/2026
02832L-1027 SepteEMPLOYER CONTRIBUTION 20%-S 09/30/2026 13.12 13.12 51388 09/30/2026
Total SECURIAN FINANCIAL GROUP INC: 352.02 352.02
MSA PROFESSIONAL SERVICES INC
28200 33160 ALLEYWAY EASEMENT 09/30/2026 825.33 825.33 1248 09/30/2026
33160 ALLEYWAY EASEMENT 09/30/2026 825.33 825.33 1248 09/30/2026
Total MSA PROFESSIONAL SERVICES INC: 1,650.66 1,650.66
NATIONAL FIRE SAFETY COUNCIL
31620 2026 NFSC SPONS 60 STUDENT SPONSORSHIP 09/30/2026 210.00 210.00 51385 09/30/2026
Total NATIONAL FIRE SAFETY COUNCIL: 210.00 210.00
NCL OF WISCONSIN INC
33000 539918 LAB SUPPLIES- WWTP 09/10/2026 2,606.53 2,606.53 51363 09/10/2026
Total NCL OF WISCONSIN INC: 2,606.53 2,606.53
ODP BUSINESS SOLUTIONS LLC
38877 478768048.001 BATH TISSUE 09/10/2026 20.67 20.67 1216 09/10/2026
478768048.001 BATH TISSUE 09/10/2026 16.43 16.43 1216 09/10/2026
478768048.001 BATH TISSUE 09/10/2026 15.89 15.89 1216 09/10/2026
Total ODP BUSINESS SOLUTIONS LLC: 52.99 52.99
ONLINE INFORMATION SERVICES
38940 1411307 ONLINE UTILITY EXCHANGE-E 09/10/2026 10.69 10.69 91020263 09/10/2026
1411307 ONLINE UTILITY EXCHANGE-W 09/10/2026 8.49 8.49 91020263 09/10/2026
1411307 ONLINE UTILITY EXCHANGE-S 09/10/2026 8.22 8.22 91020263 09/10/2026
Total ONLINE INFORMATION SERVICES: 27.40 27.40
WAUPUN UTILITIES Paid Invoice Report - COMMISSION Page: 8
Check issue dates: 9/1/2026 - 9/30/2026 Oct 05, 2026 01:58PM
Vendor Invoice Invoice Invoice Check Check Check
Number Number Description Date Amount Amount Number Issue Date
PAYMENT SERVICE NETWORK
40285 329326 RT17076-CREDIT CARD FEES-E 65% 09/10/2026 617.63 617.63 91020264 09/10/2026
329326 RT17076-CREDIT CARD FEES-W 18% 09/10/2026 171.04 171.04 91020264 09/10/2026
329326 RT17076-CREDIT CARD FEES-S 17% 09/10/2026 161.53 161.53 91020264 09/10/2026
329935 RT28446-CREDIT CARD FEES-E 38% 09/10/2026 2.09 2.09 91020264 09/10/2026
329935 RT28446-CREDIT CARD FEES-W 25% 09/10/2026 1.38 1.38 91020264 09/10/2026
329935 RT28446-CREDIT CARD FEES-S 37% 09/10/2026 2.03 2.03 91020264 09/10/2026
Total PAYMENT SERVICE NETWORK: 955.70 955.70
PIGGLY WIGGLY
41200 1192 CONFERENCE ROOM SUPPPLY - MEG & WW GROUP ME09/30/2026 24.98 24.98 51386 09/30/2026
1192CONFERENCE ROOM SUPPPLY - MEG & WW GROUP ME09/30/2026 24.98 24.98 51386 09/30/2026
CREDIT 9.2026 CREDIT 09/30/2026 1.00 1.00 51386 09/30/2026
CREDIT 9.2026 CREDIT 09/30/2026 1.00 1.00 51386 09/30/2026
CREDIT 9.2026 CREDIT 09/30/2026 1.00 1.00 51386 09/30/2026
Total PIGGLY WIGGLY: 52.96 52.96
POLYDYNE INC.
42000 2065740 CLARIFLOC CE-1855 09/30/2026 15,180.00 15,180.00 1249 09/30/2026
Total POLYDYNE INC.: 15,180.00 15,180.00
RADIO PLUS INC.
45175 3186-00004-0000 2026 SPORTS ADS CONTRACT 09/30/2026 4,345.00 4,345.00 51387 09/30/2026
Total RADIO PLUS INC.: 4,345.00 4,345.00
RESCO
46400 3126482 1 PHASE PRI URD J-BOX (3) 09/10/2026 3,660.00 3,660.00 1217 09/10/2026
3126813 TOOLS FOR NEW TRUCKS 171 & 172 09/10/2026 1,150.78 1,150.78 1217 09/10/2026
3126814 TOOLS FOR NEW TRUCKS 171 & 172 09/10/2026 1,630.90 1,630.90 1217 09/10/2026
3128781 ELECTRICAL TAPE (50) 09/30/2026 329.50 329.50 1250 09/30/2026
Total RESCO: 6,771.18 6,771.18
RUEKERT-MIELKE
49300 165537 ABNR SCADA SERVICE WORK 7/11/26-8/7/26 09/30/2026 4,661.97 4,661.97 1251 09/30/2026
Total RUEKERT-MIELKE: 4,661.97 4,661.97
SEERA
51535WAUPUN/AUGUST "WAUPUN" FOCUS PROGRAM FEE 09/10/2026 2,920.64 2,920.64 1218 09/10/2026
Total SEERA: 2,920.64 2,920.64
SENIOR EXPO COUNCIL INC
51550 200789 BOOTH FEE FOR 2026 SENIOR EXPO 09/30/2026 215.00 215.00 51389 09/30/2026
Total SENIOR EXPO COUNCIL INC: 215.00 215.00
STERICYCLE INC
51860 1000348863 DOCUMENT SHREDDING-E 09/10/2026 33.91 33.91 51364 09/10/2026
1000348863 DOCUMENT SHREDDING-W 09/10/2026 26.95 26.95 51364 09/10/2026
1000348863 DOCUMENT SHREDDING-S 09/10/2026 26.09 26.09 51364 09/10/2026
WAUPUN UTILITIES Paid Invoice Report - COMMISSION Page: 9
Check issue dates: 9/1/2026 - 9/30/2026 Oct 05, 2026 01:58PM
Vendor Invoice Invoice Invoice Check Check Check
Number Number Description Date Amount Amount Number Issue Date
Total STERICYCLE INC: 86.95 86.95
CHARTER COMMUNICATIONS
52500 171156801090726 INTERNET SERVICES-E 09/30/2026 112.44 112.44 1226 09/30/2026
171156801090726 INTERNET SERVICES-S 09/30/2026 86.49 86.49 1226 09/30/2026
171156801090726 INTERNET SERVICES-W 09/30/2026 89.37 89.37 1226 09/30/2026
171156801090726 MONTHLY SERVICE EXP -E 09/30/2026 107.49 107.49 1226 09/30/2026
171156801090726 MONTHLY SERVICE EXP-S 09/30/2026 82.68 82.68 1226 09/30/2026
171156801090726 MONTHLY SERVICE EXP-W 09/30/2026 85.44 85.44 1226 09/30/2026
171156801090726 WASTEWATER VOICE SERV 09/30/2026 94.60 94.60 1226 09/30/2026
171156801090726 WATER PLANT VOICE SERV 09/30/2026 94.60 94.60 1226 09/30/2026
Total CHARTER COMMUNICATIONS: 753.11 753.11
SPEE-DEE
52600 1536534 SERVICE CHRG FOR WATER SAMPLES 09/30/2026 70.09 70.09 51390 09/30/2026
1548181 SERVICE CHRG FOR WATER SAMPLES 09/30/2026 70.77 70.77 51390 09/30/2026
Total SPEE-DEE: 140.86 140.86
SWD LABS
54900 10172 COLIFORM BACTERIA ANALYSIS - TEMP WTR SERV 09/30/2026 35.00 35.00 51391 09/30/2026
10175 COLIFORM BACTERIA ANALYSIS - TEMP WTR SERV 09/30/2026 35.00 35.00 51391 09/30/2026
10198 COLIFORM BACTERIA ANALYSIS - TOWER #2 09/30/2026 35.00 35.00 51391 09/30/2026
Total SWD LABS: 105.00 105.00
TERMINATOR PEST CONTROL
55950 271731 PEST CONTROL MAINT TO MAIN BLDG-E 09/30/2026 66.00 66.00 51392 09/30/2026
271731 PEST CONTROL MAINT TO MAIN BLDG-W 09/30/2026 49.50 49.50 51392 09/30/2026
271731 PEST CONTROL MAINT TO MAIN BLDG-S 09/30/2026 49.50 49.50 51392 09/30/2026
Total TERMINATOR PEST CONTROL: 165.00 165.00
THURMER, MIKE
56900 3RD QTR 2026 QTRLY COMMISSION SALARY-E 09/10/2026 38.00 38.00 51365 09/10/2026
3RD QTR 2026 QTRLY COMMISSION SALARY-W 09/10/2026 31.00 31.00 51365 09/10/2026
3RD QTR 2026 QTRLY COMMISSION SALARY-S 09/10/2026 31.00 31.00 51365 09/10/2026
Total THURMER, MIKE: 100.00 100.00
TIMECLOCK PLUS
57000 INV00501492 CLOCKABLE EMPLOYEE COUNT OVER BY ONE 09/30/2026 23.87 23.87 1253 09/30/2026
INV00501492 CLOCKABLE EMPLOYEE COUNT OVER BY ONE 09/30/2026 30.03 30.03 1253 09/30/2026
INV00501492 CLOCKABLE EMPLOYEE COUNT OVER BY ONE 09/30/2026 23.10 23.10 1253 09/30/2026
Total TIMECLOCK PLUS: 77.00 77.00
TRUCLEANERS LLC
58700 AUGUST 2026 MONTHLY CLEANING SERVICE - E 09/10/2026 409.50 409.50 1219 09/10/2026
AUGUST 2026 MONTHLY CLEANING SERVICE - S 09/10/2026 315.00 315.00 1219 09/10/2026
AUGUST 2026 MONTHLY CLEANING SERVICE - W 09/10/2026 325.50 325.50 1219 09/10/2026
Total TRUCLEANERS LLC: 1,050.00 1,050.00
WAUPUN UTILITIES Paid Invoice Report - COMMISSION Page: 10
Check issue dates: 9/1/2026 - 9/30/2026 Oct 05, 2026 01:58PM
Vendor Invoice Invoice Invoice Check Check Check
Number Number Description Date Amount Amount Number Issue Date
VAN BUREN, JEROME and/or SANDRA
60800AUGUST 2026 SOLSOLAR CREDIT - 8/26 09/10/2026 471.00 471.00 51366 09/10/2026
Total VAN BUREN, JEROME and/or SANDRA: 471.00 471.00
VANDE ZANDE & KAUFMAN LLP
61200 AUGUST 2026 EASEMENT CONSULTATION, RFP, AGREEMENT REVIEW 09/30/2026 1,058.85 1,058.85 1254 09/30/2026
AUGUST 2026 EASEMENT CONSULTATION, RFP, AGREEMENT REVIEW 09/30/2026 841.65 841.65 1254 09/30/2026
AUGUST 2026 EASEMENT CONSULTATION, RFP, AGREEMENT REVIEW 09/30/2026 814.50 814.50 1254 09/30/2026
Total VANDE ZANDE & KAUFMAN LLP: 2,715.00 2,715.00
WAUPUN, CITY OF
74400 1794 2025 SINGLE AUDIT 09/30/2026 6,203.40 6,203.40 1255 09/30/2026
1796 CONTINUING DISCLOSURE FEE 09/10/2026 607.00 607.00 1208 09/10/2026
1799 EMPLOYEE CLINIC-E (38%) 09/30/2026 792.41 792.41 1255 09/30/2026
1799 EMPLOYEE CLINIC-W (25%) 09/30/2026 521.32 521.32 1255 09/30/2026
1799 EMPLOYEE CLINIC-S (37%) 09/30/2026 771.56 771.56 1255 09/30/2026
1802 2026 EMPLOYEE APPRECIATION 09/30/2026 169.28 169.28 1255 09/30/2026
1802 2026 EMPLOYEE APPRECIATION 09/30/2026 134.56 134.56 1255 09/30/2026
1802 2026 EMPLOYEE APPRECIATION 09/30/2026 130.22 130.22 1255 09/30/2026
1803 MAIN/MADISON ALLEY CONSTRUCTION - WATER 09/30/2026 284,126.56 284,126.56 1255 09/30/2026
1803 MAIN/MADISON ALLEY CONSTRUCTION - SEWER 09/30/2026 71,815.73 71,815.73 1255 09/30/2026
PILOT SEPTEMBE2026 PILOT - WATER 09/10/2026 26,433.00 26,433.00 1208 09/10/2026
PILOT SEPTEMBE2026 PILOT - ELECTRIC 09/10/2026 21,471.00 21,471.00 1208 09/10/2026
STORMWATER AUSTORMWATER RECEIPTS 09/10/2026 51,312.83 51,312.83 1208 09/10/2026
TRASH AUGUST 20TRASH/RECYCLING COLLECTION 09/10/2026 50,251.65 50,251.65 1208 09/10/2026
Total WAUPUN, CITY OF: 514,740.52 514,740.52
WEX BANK
79930 114837508 FUEL VEHICLE EXPENSE - E 09/30/2026 1,813.72 1,813.72 93020261 09/30/2026
114837508 FUEL VEHICLE EXPENSE - W 09/30/2026 893.41 893.41 93020261 09/30/2026
114837508 FUEL VEHICLE EXPENSE - S 09/30/2026 2,028.06 2,028.06 93020261 09/30/2026
Total WEX BANK: 4,735.19 4,735.19
WISCONSIN CORRECTIONAL CENTER
84300 410-0000011669 INMATE LABOR 6/14/26-6/27/26 09/10/2026 150.00 150.00 51367 09/10/2026
Total WISCONSIN CORRECTIONAL CENTER: 150.00 150.00
WISCONSIN RURAL WATER ASSOC
8820010.26 SMITH TRAI2026 SMITH TRAINING - WASTEWATER OPERATIONS 09/30/2026 125.00 125.00 51396 09/30/2026
SCHLIGHTING EXA SCHLIGHTING - GROUNDWATER & DISTRIBUTION EXAM 09/10/2026 125.00 125.00 51368 09/10/2026
Total WISCONSIN RURAL WATER ASSOC: 250.00 250.00
WISCONSIN STATE LAB OF HYGIENE
88300 30051319 FLUORIDE LAB TESTING - WTF 09/30/2026 33.00 33.00 51397 09/30/2026
Total WISCONSIN STATE LAB OF HYGIENE: 33.00 33.00
WWOA
889002026 ANNUAL CONCONFERENCE REGISTRATION - STEVE BROOKS 09/30/2026 210.00 210.00 93020263 09/30/2026
2026 ANNUAL CONCONFERENCE REGISTRATION - RYAN HOFFMAN 09/30/2026 210.00 210.00 93020263 09/30/2026
2026 ANNUAL CONCONFERENCE REGISTRATION - CHAD VELEKE 09/30/2026 210.00 210.00 93020263 09/30/2026
WAUPUN UTILITIES Paid Invoice Report - COMMISSION Page: 11
Check issue dates: 9/1/2026 - 9/30/2026 Oct 05, 2026 01:58PM
Vendor Invoice Invoice Invoice Check Check Check
Number Number Description Date Amount Amount Number Issue Date
2026 ANNUAL CONCONFERENCE REGISTRATION - BRAYDON KRAUSE 09/30/2026 75.00 75.00 93020263 09/30/2026
Total WWOA: 705.00 705.00
WPPI ENERGY
89600 27-82026 METER DATA COLLECTION - E 09/30/2026 1,030.38 1,030.38 93020262 09/30/2026
27-82026 METER DATA COLLECTION - W 09/30/2026 819.02 819.02 93020262 09/30/2026
27-82026 METER DATA COLLECTION - S 09/30/2026 792.59 792.59 93020262 09/30/2026
27-82026 HOSTED BILLING CIS-E 09/30/2026 792.70 792.70 93020262 09/30/2026
27-82026 HOSTED BILLING CIS-W 09/30/2026 630.10 630.10 93020262 09/30/2026
27-82026 HOSTED BILLING CIS-S 09/30/2026 609.77 609.77 93020262 09/30/2026
27-82026 GIS SUPPORT -E 09/30/2026 1,191.67 1,191.67 93020262 09/30/2026
27-82026 SHARED METER TECH SERVICE-E 09/30/2026 214.38 214.38 93020262 09/30/2026
27-82026 SHARED METER TECH SERVICE-W 09/30/2026 214.37 214.37 93020262 09/30/2026
27-82026 CYBER SECURITY-E 09/30/2026 236.13 236.13 93020262 09/30/2026
27-82026 CYBER SECURITY-W 09/30/2026 193.20 193.20 93020262 09/30/2026
27-82026 CYBER SECURITY-S 09/30/2026 286.22 286.22 93020262 09/30/2026
27-82026 MEMEBER NETWORK ASSESMT & MONITOR-E 09/30/2026 36.73 36.73 93020262 09/30/2026
27-82026 MEMEBER NETWORK ASSESMT & MONITOR-W 09/30/2026 29.19 29.19 93020262 09/30/2026
27-82026 MEMEBER NETWORK ASSESMT & MONITOR-S 09/30/2026 28.25 28.25 93020262 09/30/2026
27-82026 IT TICKETS -E 09/30/2026 6.44 6.44 93020262 09/30/2026
27-82026 IT TICKETS -W 09/30/2026 5.12 5.12 93020262 09/30/2026
27-82026 IT TICKETS -S 09/30/2026 4.95 4.95 93020262 09/30/2026
27-82026 WPPI WAN-E 09/30/2026 64.35 64.35 93020262 09/30/2026
27-82026 WPPI WAN-W 09/30/2026 51.15 51.15 93020262 09/30/2026
27-82026 WPPI WAN-S 09/30/2026 49.50 49.50 93020262 09/30/2026
27-82026 T-MOBILE - E 09/30/2026 5.00 5.00 93020262 09/30/2026
27-82026 T-MOBILE - W 09/30/2026 5.00 5.00 93020262 09/30/2026
27-82026 POWER PARTNER REWARDS REBATE 09/30/2026 25.00- 25.00- 93020262 09/30/2026
27-82026 WHOLE SALE POWER BILL 09/30/2026 1,263,064.20 1,263,064.20 93020262 09/30/2026
Total WPPI ENERGY: 1,270,335.41 1,270,335.41
WAUPUN UTILITIES (Refund Acct)
100000 14023140.21 REF OVERPAYMT FRM: 627 MAXON ST 09/30/2026 7.00 7.00 51394 09/30/2026
14028080.21 REF OVERPAYMT FRM: 608 TULIP LN 09/30/2026 294.45 294.45 51395 09/30/2026
17058020.33 REF OVERPAYMT FRM: 110 S HARRIS AVE APT 111 09/30/2026 468.59 468.59 51393 09/30/2026
Total WAUPUN UTILITIES (Refund Acct): 770.04 770.04
BRENDA FIGGE
100120DEPOSIT REFUND WORK ORDER 1-26-128-1 DEPOSIT REFUND (URD SERVI09/10/2026 804.11 804.11 51358 09/10/2026
Total BRENDA FIGGE: 804.11 804.11
Grand Totals: 2,167,028.27 2,167,028.27
Page: 1ACH and TRANSFER PAYMENTSWAUPUN UTILITIES
Period 09/26 (09/30/2026) Oct 05, 2026 1:54PM
Date
Reference
Number Payee or Description
Account
Number Account Title
Debit
Amount
Credit
Amount
CASH DISBURSEMENTS (CD)
1
09/15/2026 1 Record August Sales & Use Tax 1-2241-2416-00 TAX COLL PAY - SALES TAX 19,919.10
Record August Sales & Use Tax 9-1131-0000-00 COMBINED CASH .00 19,919.10-
19,919.10-19,919.10Total 1:
CASH DISBURSEMENTS (CD)
2
09/10/2026 2 Record ACH Credit Card Paymt 1-2232-0000-00 ACCOUNTS PAYABLE - ELECTRI 3,912.33
Record ACH Credit Card Paymt 2-2232-0000-00 ACCOUNTS PAYABLE - WATER 193.88
Record ACH Credit Card Paymt 3-2232-0000-00 ACCOUNTS PAYABLE - WASTEW 7,926.79
Record ACH Credit Card Paymt 9-1131-0000-00 COMBINED CASH .00 12,033.00-
12,033.00-12,033.00Total 2:
CASH DISBURSEMENTS (CD)
3
09/11/2026 3 Record WF Monthly Fees 1-5921-0000-20 OFFICE SUPPLIES AND EXPENS 11.73
Record WF Monthly Fees 2-5921-0000-20 OFFICE SUPPLIES & EXPENSES 3.25
Record WF Monthly Fees 3-5851-0000-20 OFFICE SUPPLIES & EXPENSES 3.06
Record WF Monthly Fees 9-1131-0000-00 COMBINED CASH .00 18.04-
18.04-18.04Total 3:
31,970.14-31,970.14Total CASH DISBURSEMENTS (CD):
References: 3 Transactions: 10
31,970.14-31,970.14Grand Totals:
Page 1 of 3
TO: Waupun Utilities Commissioners
FROM: Jeff Stanek, CPA, Finance Director
DATE: October 12, 2026
SUBJECT: August 2026 Financial Report
CONSTRUCTION AND PLANT ADDITIONS
The electric utility construction activity consisted of continued work on the alleyway reconstruction project,
Mutual Aid for Menasha, overhead re-builds and miscellaneous customer work. Engineering work
continues with the Business Park substation project. The Water/Sewer crews continued work associated
with the Alleyway reconstruction projects related to installing temporary services for existing customers
during the construction phase.
The electric utility had $20,320 in meter purchases for the month.
MONTHLY OPERATING RESULTS – August 2026 Monthly and Year-To-Date (YTD)
Sales
Electric
➢ Monthly kWh sales were 10.9% above budget & 9.2% higher than August 2025 on increased
sales to Residential, Large and Industrial Power customers.
➢ YTD kWh sales were 7.5% above budget & 10.1% higher than August 2025 YTD actual sales.
Water
➢ Monthly sales units of 100 cubic feet were 5.6% below budget & 2.6% higher than August 2025
sales on and increase in sales to all Residential & Industrial customers.
➢ YTD water sales were 1.2% above budget & 2.4% higher than August 2025 YTD actual sales.
Sewer
➢ Monthly sales units of 100 cubic feet were 0.1% below budget & 7.0% higher than August 2025
from higher volumes to Industrial & Public Authority customers.
➢ YTD sewer sales were 5.3% above budget & 5.5% higher than August 2025 YTD actual sales.
Income Statement
Electric
➢ Operating revenues and purchased power expense were above budget $898,100 and $829,500,
respectively, due to increased consumption and higher market energy costs.
➢ Gross margin was $68,700 above budget as a result of the higher unit sales than budgeted.
➢ Operating expenses were $90,200 below budget primarily due to lower distribution expenses
associated with tree trimming during the non-construction season, increased work order activity
and mutual aid to other communities.
➢ Operating income was $549,700 or $256,700 above budget, largely due to higher operating
revenue and lower expenses than originally budgeted.
➢ Net income was $668,600 or $371,500 above budget primarily from increased operating
revenues.
➢ The rolling 12-month Rate of Return was 9.1%.
Page 2 of 3
Water
➢ Operating revenues were above budget by $17,400 due to increases in revenues from
Commercial and Public Authority customers.
➢ Operating expenses were $41,300 above budget on higher distribution expenses associated with
water main breaks during winter freezing periods and meter costs from repaired meters.
➢ An interest-only payment on the water utility’s debt in the amount of $22,600 was made during
the month.
➢ Operating income was $372,200 or $16,900 below budget.
➢ Net income was $414,600 or $52,100 above budget.
➢ The rolling 12-month Rate of Return was 3.9%.
Sewer
➢ Operating revenues were $82,900 above budget due to slight increases high strength charges to
Public Authority customers.
➢ Operating expenses were $117,300 below budget due to fewer maintenance costs experienced
during the month, primarily from lower drying costs from the ABNR process. Also included was a
$44,000 insurance reimbursement for WWTP contractor damages which will be off -set in the next
month with the actual billing from the contractor.
➢ Operating income (loss) was $94,100 or $176,100 above budget as a result of the increased
revenues and lower operating expenses, off-set by the insurance reimbursement of $44,000.
➢ Net income (loss) was ($28,800) or $222,600 above budget largely due to lower operating
expenses.
➢ The rolling 12-month Rate of Return was 3.4%.
Balance Sheets
Electric
➢ Balance sheet increased $227,200 from July 2026 due to an increase in receivables / payables
associated with higher consumption & power-related costs typically experienced during the
summer (high consumption) months.
➢ Unrestricted cash increased $40,600 from routine operations.
➢ Net Position increased $55,700.
Water
➢ Balance sheet increased $23,100 from July 2026 due to an increase in plant through construction
in progress associated with the alleyway reconstruction project.
➢ Unrestricted cash decreased $117,100 from routine operations and payments associated with the
Madison/Mill Street alleyway reconstruction projects.
➢ Net Plant increased $125,400 from the Madison/ Mill Street Alleyway reconstruction project.
➢ Net Position increased $41,100.
Sewer
➢ Balance sheet increased $85,500 from July 2026 as a result of routine operations.
➢ Unrestricted cash increased $148,800 from routine operations which included a $44,000
insurance reimbursement which will be off-set in the subsequent month.
➢ Net Position increased $30,100 from routine operations and monthly depreciation expense being
higher than operating margins.
Cash and Investments
The monthly metrics dashboard for cash and investments provides a monthly comparison of cash and
investment balances and graphs that present long-term investments by maturity, type, and rating. The
Utility’s investments are typically fixed-income and held-to-maturity unless called before maturity by the
issuer. Held to maturity investments recognize monthly mark to market adjustments that ultimately are not
realized when the investment matures.
➢ Total cash and investments increased $167,800 or 1.2% from July 2026 primarily from routine
operating activity.
Page 3 of 3
➢ Received interest and distributions of $13,500 and recorded unrealized market adjustments of
($7,700) along with ($800) in management fees, resulting in a net portfolio gain of $5,000 for the
month.
➢ Total interest and investment income earned (excluding market value adjustments) on all accounts for
the month was $21,200 and $295,900 year-to-date.
OTHER FINANCIAL MATTERS
WWTP Upgrade – Construction Update and Progress
Listed below is a summary of the costs incurred and paid for with USDA loan proceeds requested to date:
Total Project Budget (As of 4/14/2022): $ 37,508,000
Total Project Costs to Date (Thru 3/4/2026): $ 37,362,326
Loan Draws – Project to Date (Thru 8/29/2022): $ 27,807,000
Grants Provided (Thru 4/8/2026): $ 9,555,326
Disburse Request #41 Requested (2/17/26): $ 41,439
Disburse Request #41 – Paid (3/3/2026): $ 42,433
Preliminary 2027 Budgets
See separate 2027 Budget Memo for summary analysis of the draft budget.
Outstanding Utility Bill - Tax Roll Process
Utility bills past due as of September 30, 2026 are eligible to be placed on the tax roll with customer
notification letters to be sent by October 15th, 2026. Unpaid balances will receive a 10% interest penalty
as of November 1st with the balances transferred to the County on November 16, 2026.
This concludes my report. Please do not hesitate to contact me at 324-7920 or
jstanek@waupunutilities.org with any questions or comments.
Waupun Utilities
Construction and Plant Additions Summary
August 2026
CONSTRUCTION: Total
Description Month
Project
To Date Budget Month
Project
To Date Budget Month
Project
To Date Budget
Project
To Date Budget
Projects:
Overhead and underground conductor and devices 23,180 $ 108,122 $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ 108,122$ ‐ $
Transformers ‐ ‐ 75,000 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 75,000
Overhead and Underground Services 935 11,638 10,000 ‐ ‐ ‐ ‐ ‐ ‐ 11,638 10,000
LED street lighting 4,764 17,337 10,000 ‐ ‐ ‐ ‐ ‐ ‐ 17,337 10,000
Voltage conversion ‐ ‐ 60,000 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 60,000
Rebuild overhead and underground line 5,663 7,803 310,000 ‐ ‐ ‐ ‐ ‐ ‐ 7,803 310,000
Work Invoiced to Customer / Others ‐ CIAC 465 16,896 ‐ ‐ ‐ ‐ ‐ 232 ‐ 17,128 ‐
Mutual Aid reimbursements 41,164 71,202 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 71,202 ‐
Meters / Meter Modules / Gatekeepers 20,320 20,320 10,000 ‐ ‐ ‐ 1,471 11,174 8,000 31,494 18,000
Sewer CIPP & manhole lining ‐ ‐ ‐ ‐ ‐ 85,000 ‐ ‐ ‐ ‐ 85,000
New Water Well ‐ #6 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,682 52,000 1,682 52,000
Mill / Madison Street Alleyway Reconstruction 42,674 93,320 ‐ 10,638 14,570 93,936 178,514 213,263 357,564 321,153 451,500
N Grove, Park, Franklin Street Reconstruction ‐ ‐ ‐ ‐ 11,537 ‐ ‐ 11,553
Miscellaneous Work Orders 1,070 2,003 ‐ 6,120 15,416 11,675 ‐ 1,709 ‐ 19,129 11,675
TOTAL CONSTRUCTION 140,236$ 348,641 $ 475,000$ 16,758$ 41,523$ 190,611$ 179,985$ 239,614$ 417,564$ 606,688$ 1,083,175$
CARRYOVER PROJECTS:
Business Park Substation 63,472 225,220 1,334,700 ‐ ‐ ‐ ‐ ‐ ‐ 225,220 1,334,700
Substation upgrades 7,143 171,789 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 171,789 ‐
OH & URD Re‐Build Projects 12,161 33,220 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 33,220 ‐
WWTF Phosphorus Upgrade Engineering ‐ ‐ ‐ ‐ 3,872,607 3,804,000 ‐ ‐ ‐ 3,872,607 3,804,000
WWTF Construction Upgrade ‐ ABNR ‐ ‐ ‐ ‐ 33,489,719 33,704,000 ‐ ‐ ‐ 33,489,719 33,704,000
TOTAL CARRYOVER CONSTRUCTION 82,776$ 430,229$ 1,334,700$ ‐$ 37,362,326$ 37,508,000$ ‐ $ ‐$ ‐$ 37,792,554$ 38,842,700$
PLANT ADDITIONS: Total
Description
Current
Month YTD Budget
Current
Month YTD Budget
Current
Month YTD Budget YTD Budget
Vehicle Replacements (2 utililty‐body & 1 pick‐up) ‐ $ 41,780$ 171,500 $ ‐ $ 11,415$ 10,750 $ ‐ $ 11,415$ 10,750 $ 64,609 $ 193,000 $
Admin Building Structures & Equipment ‐ 35,676 68,400 ‐ 29,900 51,300 $ ‐ 31,344 51,300 96,920 171,000
SCADA & Treatment Facility Upgrades ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 58,000 ‐ 58,000
Lift Station Upgrades ‐ ‐ ‐ ‐ ‐ 30,000 ‐ ‐ ‐ ‐ 30,000
WWTF Equipment Replacements ‐ ‐ ‐ ‐ 21,890 72,000 ‐ ‐ ‐ 21,890 72,000
WWTF Nonpotable SystemReplacements ‐ ‐ ‐ ‐ ‐ 160,000 ‐ ‐ ‐ ‐ 160,000
Other Equipment Upgrades & Replacements 107 9,571 60,600 ‐ ‐ 13,300 ‐ ‐ 33,300 9,571 107,200
TOTAL PLANT ADDITIONS 107$ 87,027$ 300,500$ ‐$ 63,205$ 337,350$ ‐$ 42,759$ 153,350$ 192,990$ 791,200$
Electric Sewer Water
Sewer WaterElectric
Page 1 of 11
Variance from Budget Variance from Budget
Current Current YTD Current Current YTD
KWh 11,460,186 10.9% 7.5% Power Costs 1,263,064 $ 39.7% 13.0%
Revenues 1,499,883$ 36.6% 11.0% Gross Margin 236,818 $ 22.4% 3.8%
Variance from Budget Variance from Budget
Current Current YTD Current Current YTD
Cubic Ft (100) 20,218 ‐5.6% 1.2% Revenues 155,881 $ ‐3.0% 0.7%
Variance from Budget Variance from Budget
Current Current YTD Current Current YTD
Cubic Ft (100) 38,461 ‐0.1% 5.3% Revenues 317,005 $ 2.3% 4.2%
Sales and Revenues Dashboard ‐ Aug 2026
5,000,000
6,000,000
7,000,000
8,000,000
9,000,000
10,000,000
11,000,000
12,000,000
13,000,000
Aug‐25 Sep‐25 Oct‐25 Nov‐25 Dec‐25 Jan‐26 Feb‐26 Mar‐26 Apr‐26 May‐26 Jun ‐26 Jul‐26 Aug‐26
kWhs Sold Actual Budgeted
10,000
12,000
14,000
16,000
18,000
20,000
22,000
24,000
Aug‐25 Sep‐25 Oct‐25 Nov‐25 Dec‐25 Jan‐26 Feb‐26 Mar‐26 Apr‐26 May‐26 Jun ‐26 Jul‐26 Aug‐26
Water Cubic Feet (100's) Sold Actual Budgeted
20,000
25,000
30,000
35,000
40,000
45,000
Aug‐25 Sep‐25 Oct‐25 Nov‐25 Dec‐25 Jan‐26 Feb‐26 Mar‐26 Apr‐26 May‐26 Jun ‐26 Jul‐26 Aug‐26Sewer Cubic Feet (100's) Treated
Actual Budgeted
Sales by Customer Class Aug 2026
‐
2,000,000
4,000,000
6,000,000
8,000,000
10,000,000
12,000,000
14,000,000
16,000,000
18,000,000
20,000,000
22,000,000
24,000,000
26,000,000
Residential Commerical Small Power Large Power Industrial Power Larg e Industrial
YTD Electric Sales (kWh)
Budget 2025 2024 2023
‐
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
Residential Commercial Industrial Public Authority
YTD Sewer Sales (Ccf)
Budget 2025 2024 2023
‐
20,000
40,000
60,000
80,000
100,000
Residential Multifamily Commercial Industrial Public Authority
YTD Water Sales (Ccf)
Budget 2025 2024 2023
Page 3 of 11
ELECTRIC Aug 2024 Aug 2025 Aug 2026
Sales of Electricity 10,538,330 $ 11,349,469 $ 12,857,000 $
Purchased Power 8,269,067 8,808,029 10,141,123
Gross Margin 2,269,263 2,541,440 2,715,876
21.5% 22.4% 21.1%
Other Operating Revenues 142,712 128,041 138,175
Operating Expenses
Distribution expense 349,772 393,053 419,952
Customer accounts expense 135,684 138,402 144,192
Advertising expense (3,972) 8,653 (879)
Administrative & general expense 486,338 527,767 493,990
Total operating expenses 967,821 1,067,876 1,057,255
Other Operating Expenses
Depreciation expense 673,094 671,369 728,854
Taxes 321,807 298,213 380,380
Total other operating expenses 994,901 969,582 1,109,235
Operating Income 449,254 632,023 687,561
Other Income (Expense)
Capital contributions 880,708 59,052 454,272
Interest expense (14,575) (6,967) (3,233)
Amortization of debt-related costs (6,258) (6,033) (2,831)
Other 196,848 181,522 477,369
Total other income (expense) 1,056,723 227,575 925,577
Net Income 1,505,977 $ 859,598 $ 1,613,138$
Regulatory Operating Income 540,552 749,855 758,187
Rate of Return 6.62 9.07 9.12
Authorized Rate of Return 5.00 6.30 6.30
Current Ratio 5.4 5.0 4.8
Months of Unrestricted Cash on Hand 5.4 5.4 5.7
Equity vs Debt 0.97 0.99 1.00
Asset Utilization 0.58 0.59 0.60
Combined E&W Debt Coverage 4.24 4.52 7.98
Minimum Required Coverage 1.25 1.25 1.25
Note 1 - Electric rates adjusted April 2024.
Definitions
Rate of Return - Return on investment in capital infrastructure. Should be near authorized rate of return.
Current Ratio - measure of liquidity or ability to pay obligations. Should be > 1.
Months of Unrestricted Cash on Hand - measure of reserves. Should be at least 2-3 months.
Equity vs Debt - Percent of infrastucture financed by operations. 50% is a good benchmark.
Asset Utilization - Illustrates the relative age of the system. Ratio of 1 indicates a system at full life expectancy.
Debt Coverage - Earnings coverage of annual debt service. Must exceed 1.25
WAUPUN UTILITIES
Income Statement and Financial Ratios
Electric Utility
For the 12 Months Ending:
Page 4 of 11
Last 12 Months YTD 2026 YTD Budget Difference
ELECTRIC
Operating Revenues 12,857,000 $ 9,055,509 $ 8,157,371 $ 898,138 $
Purchased Power 10,141,123 7,198,405 6,368,928 829,477
Gross Margin 2,715,876 1,857,103 1,788,443 68,660
21.1% 20.5% 21.9%
Other Operating Revenues 138,175 167,417 73,248 94,169
Operating Expenses
Distribution expense 419,952 310,119 419,993 (109,874)
Customer accounts expense 144,192 95,982 88,656 7,326
Advertising expense (879) 6,026 560 5,466
Administrative & general expense 493,990 376,900 369,969 6,931
Total operating expenses 1,057,255 789,027 879,178 (90,151) -10.25%
Other Operating Expenses
Depreciation expense 728,854 468,782 468,784 (2)
Taxes 380,380 216,988 220,688 (3,700)
Total other operating expenses 1,109,235 685,769 689,472 (3,703)
Operating Income 687,561 549,725 293,041 256,684
Other Income (Expense)
Capital contributions 454,272 - - -
Interest expense (3,233) (975) (1,952) 977
Amortization of debt-related costs (2,831) (847) (568) (279)
Other 477,369 120,745 6,664 114,081
Total other income (expense) 925,577 118,923 4,144 114,779
Net Income 1,613,138 $ 668,648 $ 297,185 $ 371,463 $
Aug 2026 July 2026 June 2026 May 2026 April 2026 March 2026 Feb 2026 J an 2026 Dec 2025 Nov 2025 Oct 2025 Sept 2025 Aug 2025
Operating Revenues 1,499,883$ 1,379,730 $ 1,164,611 $ 1,027,198 $ 921,776 $ 962,424 $ 1,091,652 $ 1,008,235 $ 936,399 $ 874,356 $ 943,931 $ 1,046,804 $ 1,322,666 $
Purchased Power 1,263,064 1,121,772 927,632 806,569 696,551 737,978 869,528 775,311 703,826 671,351 727,762 839,779 1,101,544
Gross Margin 236,818 257,957 236,979 220,629 225,225 224,446 222,124 232,924 232,573 203,006 216,169 207,025 221,121
15.8% 18.7% 20.3% 21.5% 24.4% 23.3% 20.3% 23.1% 24.8% 23.2% 22.9% 19.8% 16.7%
Other Operating Revenues 9,776 19,843 9,993 11,568 9,919 9,910 9,436 86,972 (60,792) 9,729 10,895 10,927 12,300
Operating Expenses
Distribution expense 46,484 27,814 25,495 24,051 30,386 41,486 55,430 58,972 9,446 30,199 33,990 36,199 46,552
Customer accounts expense 15,833 12,440 11,567 10,607 11,720 10,839 10,404 12,573 18,222 9,680 10,123 10,185 11,551
Advertising expense 625 1,336 2,803 (3,866) 1,126 1,965 1,787 250 (3,263) (7,718) 3,123 954 2,088
Administrative & general expense 51,989 41,741 32,852 48,383 22,542 61,798 51,345 66,251 20,020 25,479 39,739 31,852 46,022
Total operating expenses 114,930 83,331 72,717 79,174 65,774 116,088 118,966 138,046 44,424 57,639 86,975 79,190 106,213
Other Operating Expenses
Depreciation expense 58,598 58,598 58,598 58,598 58,598 58,598 58,598 58,598 93,824 55,416 55,416 55,416 55,416
Taxes 26,783 25,373 24,921 25,067 30,646 26,777 27,219 30,200 72,183 23,993 43,186 24,031 26,612
Total other operating expenses 85,380 83,971 83,519 83,665 89,244 85,375 85,817 88,798 166,007 79,409 98,602 79,447 82,028
Operating Income 46,283 110,498 90,737 69,357 80,126 32,893 26,777 93,053 (38,651) 75,686 41,487 59,315 45,180
Other Income (Expense)
Capital contributions - - - - - - - - 454,272 - - - -
Interest expense - - - - - (975) - - (565) (565) (565) (565) (565)
Amortization of debt-related costs - - - - - (706) (70) (70) (496) (496) (496) (496) (496)
Other 9,446 21,033 25,943 14,524 9,936 5,598 19,721 14,545 315,019 16,894 9,780 14,931 19,023
Total other income (expense) 9,446 21,033 25,943 14,524 9,936 3,917 19,650 14,475 768,231 15,833 8,719 13,870 17,962
Net Income 55,730 $ 131,531 $ 116,679 $ 83,881 $ 90,062 $ 36,810 $ 46,428 $ 107,527 $ 729,580 $ 91,519 $ 50,206 $ 73,185 $ 63,142 $
WAUPUN UTILITIES
Detailed Income Statement and YTD Budget Comparison
Electric Utility
For the Period Ended Aug, 31 2026
Page 5 of 11
WATER Aug 2024 Aug 2025 Aug 2026
Operating Revenues 2,715,382 $ 2,672,799 $ 2,683,345 $
Operating Expenses
Source of supply expenses 4,162 2,496 4,706
Pumping expenses 85,970 90,188 104,806
Water treatment expenses 402,175 337,764 336,480
Transmission & distribution expenses 218,946 223,472 285,198
Customer accounts expenses 119,860 117,855 121,330
Administrative & general expense 387,499 370,953 372,815
Total operating expenses 1,218,613 1,142,729 1,225,334
Other Operating Expenses
Depreciation expense 612,312 602,822 619,203
Taxes 336,383 326,522 401,456
Total other operating expenses 948,695 929,344 1,020,659
Operating Income 548,074 600,727 437,353
Other Income (Expense)
Capital contributions from customers and municipal 1,189,564 10,900 111,511
Interest expense (77,450) (67,929) (55,863)
Amortization of debt-related costs (14,505) (13,303) (4,858)
Other 168,529 129,311 125,469
Total other income (expense) 1,266,137 58,979 176,260
Net Income 1,814,212 $ 659,706 $ 613,612 $
Regulatory Operating Income 636,677 607,544 508,577
Rate of Return 4.68 4.49 3.86
Authorized Rate of Return 6.50 6.50 6.50
Current Ratio 51.86 198.69 87.01
Months of Unrestricted Cash on Hand 23.90 28.07 27.84
Equity vs Debt 0.83 0.86 0.89
Asset Utilization 0.42 0.44 0.46
Note 1 - Water rates adjusted May 2012.
Definitions
Rate of Return - Return on investment in capital infrastructure. Should be near authorized rate of return.
Current Ratio - measure of liquidity or ability to pay obligations. Should be > 1.
Months of Unrestricted Cash on Hand - measure of reserves. Should be at least 2-3 months.
Equity vs Debt - Percent of infrastucture financed by operations. 50% is a good benchmark.
Asset Utilization - Illustrates the relative age of the system. Ratio of 1 indicates a system at full life expectancy.
WAUPUN UTILITIES
Income Statement and Financial Ratios
Water Utility
For the 12 Months Ending:
Page 6 of 11
Last 12 Months YTD 2026 YTD Budget Difference
WATER
Operating Revenues 2,683,345 $ 1,809,324 $ 1,791,919 $ 17,405 $
Operating Expenses
Source of supply expenses 4,706 2,966 384 2,582
Pumping expenses 104,806 74,947 59,432 15,515
Water treatment expenses 336,480 213,08 5 191,56 8 21,517
Transmission & distribution expenses 285,198 181,21 7 144,03 7 37,180
Customer accounts expenses 121,330 84,932 76,280 8,652
Administrative & general expense 372,815 257,57 8 301,71 3 (44,135 )
Total operating expenses 1,225,334 814,72 4 773,41 4 41,310 5.34%
Other Operating Expenses
Depreciation expense 619,203 393,79 5 417,912 (24,117 )
Taxes 401,45 6 228,57 3 211,464 17,109
Total other operating expenses 1,020,659 622,368 629,376 (7,008)
Operating Income 437,353 372,231 389,129 (16,898)
Other Income (Expense)
Capital contributions 111,511 - - -
Interest expense (55,863) (35,067) (35,064) (3)
Amortization of debt-related costs (4,858) (560) 1,720 (2,280)
Other 125,469 77,985 6,664 71,321
Total other income (expense) 176,260 42,358 (26,680 ) 69,038
Net Income 613,612$ 414,590 $ 362,449 $ 52,141 $
Aug 2026 July 2026 June 2026 May 2026 April 2026 March 2026 Feb 2026 J an 2026 Dec 2025 Nov 2025 Oct 2025 Sept 2025 Aug 2025
WATER
Operating Revenues 231,904 $ 243,62 8$ 232,16 6$ 236,31 8$ 218,35 9$ 214,41 9$ 212,85 5$ 219,67 3$ 218,05 3$ 215,88 8$ 222,03 5$ 218,04 6$ 226,54 6$
Operating Expenses
Source of supply expenses - 114 - 2,557 - 182 112 - 1,740 - - - -
Pumping expenses 7,271 7,079 13,921 7,489 6,444 9,335 12,223 11,185 9,429 6,371 6,327 7,732 7,610
Water treatment expenses 36,351 31,057 24,883 24,771 25,158 21,369 28,795 20,701 39,398 23,716 24,735 35,546 35,388
Transmission & distribution expenses 22,069 13,898 13,973 47,259 17,863 20,663 24,144 21,349 42,516 15,283 25,914 20,268 23,923
Customer accounts expenses 14,441 10,580 10,338 9,090 10,149 9,597 9,316 11,421 10,056 8,780 8,686 8,875 10,625
Administrative & general expense 34,477 30,282 26,771 27,528 14,546 49,245 32,930 41,798 46,976 17,431 27,923 22,907 31,865
Total operating expenses 114,610 93,010 89,886 118,692 74,160 110,392 107,520 106,454 150,115 71,580 93,587 95,327 109,412
Other Operating Expenses
Depreciation expense 49,224 49,224 49,224 49,224 49,224 49,224 49,224 49,224 84,739 46,890 46,890 46,890 46,890
Taxes 29,805 28,185 28,102 28,176 28,044 27,926 28,536 29,800 88,508 27,913 28,080 28,381 29,459
Total operating expenses 79,030 77,409 77,326 77,400 77,268 77,150 77,760 79,025 173,248 74,802 74,970 75,271 76,349
Operating Income 38,265 73,209 64,954 40,226 66,930 26,878 27,575 34,195 (105,310) 69,505 53,478 47,448 40,785
Other Income (Expense)
Capital contributions - - - - - - - - 111,511 - - - -
Interest expense (4,383) (4,383) (4,383) (4,383) (4,383) (4,383) (4,383) (4,383) (5,199) (5,199) (5,199) (5,199) (5,199)
Amortization of debt-related costs 786 786 786 786 786 (4,921) 215 215 (1,074) (1,074) (1,074) (1,074) (1,074)
Other 6,455 8,754 12,716 11,686 10,755 2,454 13,401 11,763 13,590 15,034 6,737 12,123 16,264
Total other income (expense) 2,858 5,157 9,119 8,089 7,158 (6,850) 9,233 7,595 118,828 8,760 464 5,850 9,990
Net Income 41,122 $ 78,366 $ 74,073 $ 48,315 $ 74,088 $ 20,027 $ 36,809 $ 41,790 $ 13,517 $ 78,266 $ 53,942 $ 53,297 $ 50,776 $
WAUPUN UTILITIES
Detailed Income Statement and YTD Budget Comparison
Water Utility
For the Period Ended Aug 31, 2026
Page 7 of 11
SEWER Aug 2024 Aug 2025 Aug 2026
Operating Revenues 3,407,405 $ 3,385,767 $ 3,907,286 $
Operating Expenses
WWTP operation expenses 734,536 520,648 732,429
Laboratory expenses 116,685 108,086 110,073
Maintenance expenses 502,254 582,213 510,106
Customer accounts expenses 156,116 148,084 155,305
Administrative & general expenses 570,013 494,392 587,049
Total operating expenses 2,079,605 1,853,423 2,094,962
Other Operating Expenses
Depreciation expense 912,119 1,558,817 1,408,211
Total other operating expenses 912,119 1,558,817 1,408,211
Operating Income 415,681 (26,474) 404,113
Other Income (Expense)
Interest expense (308,416) (305,720) (291,864)
Capital contributions 1,899,165 1,677,171 286,357
Other 185,465 155,032 121,181
Total other income (expense) 1,776,215 1,526,483 115,674
Net Income (loss) 2,191,895 $ 1,500,009 $ 519,787 $
Operating Income (excluding GASB 68 & 75) 441,614 (94,669) 424,505
Rate of Return 2.67 (0.72) 3.38
Current Ratio 9.24 9.93 13.06
Months of Unrestricted Cash on Hand 6.71 7.67 12.37
Equity vs Debt 0.46 0.48 0.48
Asset Utilization 0.53 0.57 0.58
Debt Coverage 1.67 1.88 2.15
Minimum Required Coverage 1.20 1.20 1.20
Note 1 - Sewer rates adjusted April 2025.
Definitions
Rate of Return - Return on investment in capital infrastructure.
Current Ratio - measure of liquidity or ability to pay obligations. Should be > 1.
Months of Unrestricted Cash on Hand - measure of reserves. Should be at least 2-3 months.
Equity vs Debt - Percent of infrastucture financed by operations. 50% is a good benchmark.
Asset Utilization - Illustrates the relative age of the system. Ratio of 1 indicates a system at full life expectancy.
Debt Coverage - Earnings coverage of annual debt service. Must exceed 1.20
WAUPUN UTILITIES
Income Statement and Financial Ratios
Sewer Utility
For the 12 Months Ending:
Page 8 of 11
Last 12 Months YTD 2026 YTD Budget Difference
SEWER
Operating Revenues 3,907,286 $ 2,648,784 $ 2,565,897 $ 82,887 $
Operating Expenses
WWTP operation expenses 732,429 489,082 498,528 (9,446)
Laboratory expenses 110,073 73,745 75,736 (1,991)
Maintenance expenses 510,106 302,095 401,800 (99,705)
Customer accounts expenses 155,305 108,540 99,584 8,956
Administrative & general expenses 587,049 373,148 388,310 (15,162)
Total operating expenses 2,094,962 1,346,610 1,463,958 (117,347) -8.02%
Other Operating Expenses
Depreciation expense 1,408,211 1,208,043 1,183,880 24,163
Total other operating expenses 1,408,211 1,208,043 1,183,880 24,163
Operating Income (Loss) 404,113 94,130 (81,941) 176,071
Non-operating Income (Expense)
Interest Expense (291,864) (196,141) (196,144) 3
Capital contributions 286,357 994 - 994
Other 121,181 72,194 26,664 45,530
Total other income (expense) 115,674 (122,953) (169,480) 46,527
Net Income (Loss) 519,787 $ (28,823) $ (251,421)$ 222,598 $
Aug 2026 July 2026 June 2026 May 2026 April 2026 March 2026 Feb 2026 J an 2026 Dec 2025 Nov 2025 Oct 2025 Sept 2025 Aug 2025
SEWER
Operating Revenues 339,762 $ 337,459 $ 334,256 $ 348,997 $ 338,946 $ 308,030 $ 319,975 $ 321,358 $ 310,709 $ 305,007 $ 324,991 $ 317,794 $ 333,014 $
Operating Expenses
WWTP operation expenses 63,485 76,572 53,815 66,174 54,151 42,378 66,129 66,377 82,257 43,632 45,844 71,614 67,364
Laboratory expenses 10,830 7,166 7,711 8,134 8,660 10,557 12,680 8,007 9,572 13,416 5,638 7,702 9,099
Maintenance expenses (1,896) 44,180 75,396 61,182 41,577 23,901 29,721 28,036 63,889 36,593 77,891 29,638 61,242
Customer accounts expenses 17,352 13,687 13,296 12,235 13,828 12,323 11,958 13,860 12,070 11,304 11,675 11,714 13,367
Administrative & general expense 49,709 41,742 39,614 48,297 32,336 60,927 45,945 54,577 72,737 31,227 58,441 51,495 46,091
Total operating expenses 139,481 183,347 189,833 196,021 150,552 150,086 166,433 170,857 240,526 136,172 199,489 172,164 197,164
Other Operating Expenses
Depreciation expense 151,005 151,005 151,005 151,005 151,005 151,005 151,005 151,005 (247,197) 149,122 149,122 149,122 149,122
Total other operating expenses 151,005 151,005 151,005 151,005 151,005 151,005 151,005 151,005 (247,197) 149,122 149,122 149,122 149,122
Operating Income (Loss) 49,276 3,107 (6,582) 1,970 37,388 6,938 2,536 (505) 317,380 19,714 (23,619) (3,491) (13,271)
Other Income (Expense)
Interest expense (24,518) (24,518) (24,518) (24,518) (24,518) (24,518) (24,518) (24,518) (19,141) (25,528) (25,528) (25,528) (25,528)
Capital contributions - - - - - 994 - - 285,363 - - - 221,200
Other 5,331 7,479 12,633 11,330 10,302 332 13,400 11,388 13,474 15,226 6,515 13,771 19,376
Total other income (expense) (19,187) (17,039) (11,885) (13,188) (14,216) (23,192) (11,118) (13,130) 279,696 (10,301) (19,012) (11,756) 215,049
Net Income (Loss) 30,090 $ (13,931) $ (18,467) $ (11,217) $ 23,173 $ (16,253) $ (8,582) $ (13,635) $ 597,076 $ 9,412 $ (42,631)$ (15,248) $ 201,777 $
WAUPUN UTILITIES
Detailed Income Statement and YTD Budget Comparison
Sewer Utility
For the Period Ended Aug 31, 2026
Page 9 of 11
ELECTRIC Aug 2024 Aug 2025 Aug 2026 July 2026 Change
Cash and investments - unrestricted 4,331,395 $ 4,573,686 $ 5,464,902 $ 5,424,286 $ 40,616 $
Cash and investments - restricted 137,491 144,419 0 1 (1)
Receivables 1,497,837 1,636,271 1,704,009 1,566,158 137,850
Materials and supplies 424,719 450,846 448,830 452,695 (3,865)
Other assets 68,647 97,370 103,746 127,799 (24,053)
Plant - net of accumulated depreciation 9,685,776 10,121,329 10,499,473 10,422,810 76,663
Deferred outflows of resources 803,475 559,453 384,433 384,433 -
Total Assets 16,949,340 17,583,373 18,605,393 18,378,183 227,210
Accounts payable 1,086,414 1,244,280 1,493,889 1,327,245 166,644
Payable to sewer utility - - - - -
Interest accrued 1,350 (308) - - -
Accrued benefits 89,742 98,298 110,797 108,039 2,758
Deferred inflows of resources 1,533,737 1,328,981 670,446 668,368 2,078
Long-term debt 380,000 195,000 - - -
Net Position 13,858,097 14,717,123 16,330,261 16,274,531 55,730
Total Liabilities & Net Position 16,949,340$ 17,583,373$ 18,605,393$ 18,378,183$ 227,210 $
WATER Aug 2024 Aug 2025 Aug 2026 July 2026 Change
Cash and investments - unrestricted / designated 3,097,649$ 3,436,237 $ 3,774,482 $ 3,891,571 $ (117,089) $
Cash and investments - restricted 406,489 421,500 411,436 399,037 12,400
Receivables 258,324 252,682 250,514 264,465 (13,951)
Materials and supplies 84,343 109,166 108,412 108,938 (526)
Other assets 73,252 67,281 118,417 101,610 16,807
Plant - net of accumulated depreciation 16,434,485 16,164,401 15,938,399 15,812,989 125,410
Deferred outflows of resources 451,080 328,826 247,748 247,748 -
Total Assets 20,805,621 20,780,093 20,849,409 20,826,358 23,052
Accounts payable 66,286 19,358 43,790 44,680 (891)
Interest accrued (1,580) (792) 2,471 20,681 (18,210)
Accrued benefits 59,291 65,643 54,239 52,423 1,817
Deferred inflows of resources 644,252 468,808 393,221 394,007 (786)
Long-term debt 2,970,000 2,500,000 2,015,000 2,015,000 -
Net Position 17,067,371 17,727,077 18,340,689 18,299,567 41,122
Total Liabilities & Net Position 20,805,621$ 20,780,093$ 20,849,409$ 20,826,358$ 23,052 $
SEWER Aug 2024 Aug 2025 Aug 2026 July 2026 Change
Cash and investments - unrestricted 1,163,666 $ 1,184,490 $ 2,160,235 $ 2,011,436 $ 148,800 $
Cash and investments - restricted 2,522,632 2,806,777 2,577,814 2,494,717 83,098
Receivables 345,278 359,513 359,861 364,890 (5,029)
Receivable from electric utility - - - - -
Materials and supplies 8,597 8,677 8,313 8,507 (194)
Advances to other funds - - - - -
Other assets 55,445 41,731 69,565 74,606 (5,040)
Plant - net of accumulated depreciation 49,177,427 49,709,753 48,903,398 49,039,514 (136,117)
Deferred outflows of resources 729,543 501,909 383,452 383,452 -
Total Assets 54,002,587 54,612,850 54,462,639 54,377,121 85,518
Accounts payable 61,850 52,764 95,982 67,847 28,135
Interest accrued 101,500 102,721 96,919 72,401 24,518
Accrued benefits 89,749 99,597 92,948 90,173 2,775
Deferred inflows of resources 853,190 557,361 459,296 459,296 -
Long-term debt 26,533,400 25,937,500 25,334,800 25,334,800 -
Net Position 26,362,898 27,862,907 28,382,694 28,352,604 30,090
Total Liabilities & Net Position 54,002,587$ 54,612,850$ 54,462,639$ 54,377,121$ 85,518 $
WAUPUN UTILITES
Balance Sheets
Electric, Water, and Sewer
Page 10 of 11
Monthly Dashboard - Cash & Investments August 2026
Account Restrictions Aug 2026 July 2026 $ Inc/(Dec) % Inc/(Dec)
Checking ‐ E Unrestricted 854,297 $ 823,128 $ 31,168 $ 3.79%
Checking ‐ W Unrestricted 469,334 580,478 (111,144) ‐19.15%
Checking ‐ S Unrestricted 1,058,992 832,426 226,566 27.22%
Reserves ‐ E Unrestricted 4,178,572 4,170,480 8,093 0.19%
Reserves ‐ W Unrestricted 2,706,964 2,714,796 (7,832) ‐0.29%
Reserves ‐ S Unrestricted 1,101,243 1,179,009 (77,766) ‐6.60%
P&I Redemption ‐ E Restricted 0 1 (1) ‐99.87%
P&I Redemption ‐ W Restricted 228,705 216,305 12,400 5.73%
P&I Redemption ‐ S Restricted 300,685 226,272 74,413 32.89%
Bond Reserve ‐ S Restricted 564,151 556,651 7,500 1.35%
Construction ‐ S Restricted 0 0 ‐ 0.00%
Depreciation ‐ E Restricted ‐ ‐ ‐ #DIV/0!
Depreciation ‐ W Restricted 182,732 182,732 ‐ 0.00%
Capital Improve. ‐ E Designated 432,033 430,678 1,355 0.31%
Capital Improve. ‐ W Designated 103,253 102,927 326 0.32%
ERF ‐ Water Plant Designated 494,931 493,369 1,562 0.32%
ERF ‐ WWTP Restricted 1,712,978 1,711,794 1,184 0.07%
14,388,871$ 14,221,048 $ 167,823 $ 1.18%
Unrestricted and Designated 11,399,620$ 11,327,293 $ 72,327$ 0.64%
Restricted 2,989,251$ 2,893,755 $ 95,496$ 3.30%
$‐
$500,000
$1,000,000
$1,500,000
$2,000,000
Cash <12 mos. 13‐24 mos. 25‐36 mos. 37‐48 mos. 49‐60 mos. >60 mos.
Long‐Term Investment by Maturity
22%
11%
48%
9%
5%
5%Long‐Term Investments by Type
Cash/Money Markets
Certificate of Deposits
Muni Bonds
US Government
Government Agencies
Corporate Bonds
Page 11 of 11
TO: Waupun Utilities Commissioners
FROM: Steve Brooks, General Manager
DATE: October 12, 2026
SUBJECT: Utilities Commission Review Summary – Construction Contract for Storage Building
Project Summary
Waupun Utilities solicited proposals for the design and construction of a new 60’ x 120’ x 18’
commercial base building intended to support utility operations and equipment storage on August 12,
2026.
The project is proposed as a Design-Build delivery method to streamline engineering, permitting, and
construction coordination.
Requested Board Action
One proposal was received by the October 1, 2026 deadline. Staff has evaluated the submission and
recommends that the Waupun Utilities Commission approve the proposal submitted by M.P.B. Builders,
Inc. for the 60’ x 120’ x 18’ Design-Build Base Building Project in the amount of $335,798.00, subject to
final contract execution and required documentation acceptable to Waupun Utilities.
Recommended motion upon proposal review:
Motion to award the contract for the 60’ x 120’ x 18’ Design-Build Base Building Project to M.P.B
Builders, Inc. in the amount of $335,798.00, subject to final contract execution and required
documentation.
Attachment
Proposal form - M.P.B. Builders, Inc.
WAUPUN UTILITIES
EMPLOYEE WELLNESS PROGRAM POLICY
Health Insurance Premium Contribution
1. Purpose
Waupun Utilities (“Utility”) is committed to supporting the health and well-being of its employees and
their families and providing access to affordable quality health care plan coverage and benefits. This
policy establishes the Utility’s Wellness Program, the components required for participation, and the
effect of participation (or non-participation) on the employee's monthly contribution toward health care
plan premiums.
2. Applicability
This policy applies to all benefit-eligible Utility employees enrolled in the Utility's group health care plan,
and to their covered spouses enrolled under that plan. Beginning with the plan year identified in Section
5, spouses covered under an employee's health care plan are included in the Wellness Program
requirements on the same basis as the employee.
3. Policy Statement
Employees (and, where applicable, covered spouses) are encouraged to participate in the Utility's
Wellness Program each plan year. Employees who, together with any covered spouse, complete both
required Wellness Program components within the designated completion window will maintain the
standard (lower) employee premium contribution rate for the following plan year. Employees who do
not complete the required components — or whose covered spouse does not complete the required
components — will be subject to a higher employee premium contribution rate for the following plan
year, as set out in Section 6.
4. Required Wellness Program Components
To satisfy the Wellness Program requirement, the employee and any covered spouse must each
complete a wellness check at the Waupun Wellness Clinic at no initial cost to the employee or spouse.
The wellness check must be completed within the designated completion window:
Specific screening dates, the completion window, and the online portal link will be published annually by
the General Manager prior to the start of each Wellness Program cycle.
5. Program Timeline
The Wellness Program operates on an annual cycle. Components completed during a designated
completion window determines the employee premium contribution rate for the plan year that follows.
The General Manager will publish the specific completion window and applicable plan year dates each
cycle, consistent with the following structure:
• Completion Window: components must be completed within the annual window established by
Human Resources (typically October 1 through June 30 of the year preceding the applicable plan
year).
• Applicable Plan Year: the resulting contribution rate applies for the 12-month plan year
beginning January 1 and ending December 31.
• Spouse Inclusion: beginning with the plan year designated by General Manager, covered
spouses are required to complete a wellness exam on the same schedule as employees in order
for the employee to receive the standard contribution rate.
6. Premium Contribution Structure
Employees who are benefit-eligible and who participate in the health care plan will pay a monthly
premium contribution based on Wellness Program completion as follows:
Wellness Program Outcome Employee Contribution Change
Employee (and covered spouse, where
applicable) completes both required
Wellness Program components within
the designated window
15% of total monthly
premium
Baseline rate
Employee and/or covered spouse does
not complete one or both required
components (and no reasonable
alternative standard applies)
22.5% of total monthly
premium
50% higher
The figures above reflect the Utility's current premium contribution structure and are provided as the working
template for this policy. The General Manager will confirm these percentages annually against the Utility's active
health plan documents and any applicable collective bargaining agreements before publication.
7. Reasonable Alternative Standard
Consistent with applicable federal requirements for employer wellness programs (including the
Americans with Disabilities Act, the Genetic Information Nondiscrimination Act, and HIPAA
nondiscrimination rules), the Utility will provide a reasonable alternative standard — or, where
appropriate, waive a requirement — for any employee or covered spouse for whom it is unreasonably
difficult due to a medical condition, or medically inadvisable, to complete a required component.
Employees should contact the General Manager to request an alternative standard; a request will not be
denied without an interactive process, and the standard employee contribution rate will apply once the
alternative has been satisfied.
8. Confidentiality of Health Information
All individually identifiable health information collected through Wellness Exam is collected and
maintained by the Utility's health plan administrator or wellness vendor in accordance with HIPAA
privacy and security requirements. The Utility receives only aggregate participation data confirming
whether the employee and any covered spouse completed the required exam; the Utility does not
receive individual health results or diagnoses.
9. Administration
The General Manager administers the Wellness Program, including publishing annual deadlines and
instructions, tracking completion status through the plan administrator, verifying eligibility for the
standard contribution rate, and applying the appropriate contribution rate through payroll deduction for
each plan year. Questions regarding Wellness Program requirements, completion status, or requests for
a reasonable alternative standard should be directed to the General Manager.
10. Effective Date
This policy is effective upon adoption by the Waupun Utilities Commission and supersedes any prior
wellness program or premium contribution policy addressing the same subject matter. The General
Manager will review this policy annually and recommend updates as needed to reflect changes in plan
design, vendor requirements, or applicable law. This policy is subject to amendment by the Waupun
Utilities Commission at any time.
Adopted by the Waupun Utilities Commission: _______________________
Motion: To amend the 2026 Water Utility budget to include rehab maintenance costs for water Wells #2 & #3.
Since the WDNR denied our application to construct Well #6 in April 2026, the utility engaged
Municipal Well & Pump to evaluate the longevity of the two existing wells. The evaluation determined
the life of each Well could be extended with routine rehab maintenance including pump, motor and
piping replacements. The total rehab for Well #2 is $52,157 and Well #3 is $50,328 for a total of
$102,485. This budget amendment proposes the completion of both Well rehabilitations in the 2026
budget year at a total cost not to exceed $120,000.
Electric Water Sewe r Total
Well #2 & #3 Rehabilitation - 120,000 - 120,000
Total Amendment - $ 120,000$ -$ 120,000$
WATER BUDGET
Cash Flow April 2026 October 2026
Amended Amended
Budget #1 Budget #2 $ Change
Sources of Cash
Total Operating Revenues 2,685,986 $ 2,685,986 $ - $
Interest Earnings 10,000 10,000 -
Total Sources of Cash 2,695,986 2,695,986 -
Uses of Cash
Total Operation and Maintenance Expenses 1,179,057 1, 299,057 120,000
Taxes 317,190 317,190 -
Debt Service -
2019 Revenue Bonds 111,788 111,788 -
2019 Refunding Revenue Bonds 425,813 425,813 -
Vehicle Equipment Replacement Funding 50,000 50,000 -
Plant Additions and Construction 865,800 865,800 -
Total Uses of Cash 2,949,648 3,069,648 120,000
Cash Applied to / (Used From) Water Reserves (253,662)$ (373,662)$ (120,000) $
Unrestricted Cash Reserves as of March 31 & August 31, 2026 3,063,100$ 3,229,530$
Projected Unrestricted Cash Reserves 2,809,438$ 2,855,868$
Estimated Months of Unrestricted Cash on Hand 28.59 26.38
Waupun Utilities
2026 Budget - Electric, Water & Sewer
Budget Amendment
October 12, 2026
Page 1 of 1
Compensation for Standby
Employees assigned for standby status may be eligible to receive additional compensation for the
assigned standby period, and eligibility for and receipt of such pay rate is determined on a case-by-case
basis by the Department Supervisor and the General Manager. The final decision as to whether the
employee will receive pay at the rate described below by department shall belong to the General
Manager and only subject to review by the Commission.
The Utilities reserves the right to change the standby period to accommodate operational changes. The
employee assigned to standby will remain available for the time periods designated by the Department
Supervisor or General Manager. Holidays occurring during an assigned standby period will typically be
covered from the end of the shift to the start of the next regularly scheduled workday.
The standby schedule will be approved by the applicable Department Supervisor.
Employees on standby may be eligible to receive call-in pay, overtime, and double-time for actual hours
worked as provided and subject to approval as identified in this policy.
Electric Department
Electric Department employees, as determined by the Department Supervisor or General Manager, shall
be assigned on a rotating weekly basis to standby responsibilities on weekends and holidays. Employees
assigned to standby shall remain available for contact and shall be able to respond to a call within a
maximum of 20 minutes. Employees assigned to standby must remain capable of safely performing
assigned work if called in and may not consume alcoholic beverages while on standby. Electric
Department employees assigned to standby shall receive twelve (12) hours of straight-time pay for each
weekend standby period, defined as beginning at the end of the employee's work week and continuing
through the employee's scheduled start time on Monday. An employee assigned to standby for an
observed weekday holiday shall receive five (5) hours of straight-time pay. While on standby, the normal
call-in compensation provisions shall apply for actual hours worked.
Water/Sewer Collection and Distribution Department
Water/Sewer Collection and Distribution employees, as determined by the Department Supervisor or
General Manager, shall be assigned on a rotating weekly basis to standby responsibilities on weekends
and holidays. Employees assigned to standby shall remain available for contact and shall be able to
respond to a call within a maximum of 30 minutes. Employees assigned to standby must remain capable
of safely performing assigned work if called in and may not consume alcoholic beverages while on
standby. Water/Sewer Collection and Distribution employees assigned to standby shall receive nine (9)
hours of straight-time pay for each weekend standby period, defined as beginning at the end of the
employee's work week and continuing through the employee's scheduled start time on Monday. An
employee assigned to standby for an observed weekday holiday shall receive four (4) hours of straight-
time pay. While on standby, the normal call-in compensation provisions shall apply for actual hours
worked.
Office
On the day following scheduled disconnections, an office staff employee, as determined by the
Department Supervisor or General Manager, shall be assigned to standby when customers remain
Deleted: 18% of their regular hourly wage
Deleted: standby
Deleted: call for
Deleted: , which typically may be from 3:00 p.m. Friday to
7:00 a.m. Monday
Deleted: While assigned in a standby capacity, the
employee shall remain available for contact and so that he
or she can respond to a call within a maximum 20 minute
response time, and the employee may not consume
alcoholic beverages.
Deleted: and
disconnected. The employee assigned to standby shall have Utility-related phone calls forwarded to a
Utility-provided phone and shall remain available for contact from the end of the employee's scheduled
workday on the day of disconnections until the start of the employee's next scheduled workday. Office
employees assigned to standby shall receive three (3) hours of straight-time pay. Employees assigned to
standby must remain capable of safely performing assigned work if called and may not consume
alcoholic beverages while on standby. If an employee receives a Utility-related call while on standby that
requires work to be performed but does not require the employee to physically restore service, the
employee shall receive overtime compensation for the applicable work performed. If a call requires the
employee to physically restore service, the employee shall receive applicable call-in pay and overtime
compensation in accordance with the Utility's normal compensation provisions.
Compensation for Standby
Employees assigned for standby status may be eligible to receive additional compensation for the
assigned standby period, and eligibility for and receipt of such pay rate is determined on a case-by-case
basis by the Department Supervisor and the General Manager. The final decision as to whether the
employee will receive pay at the rate described below by department shall belong to the General
Manager and only subject to review by the Commission.
The Utilities reserves the right to change the standby period to accommodate operational changes. The
employee assigned to standby will remain available for the time periods designated by the Department
Supervisor or General Manager. Holidays occurring during an assigned standby period will typically be
covered from the end of the shift to the start of the next regularly scheduled workday.
The standby schedule will be approved by the applicable Department Supervisor.
Employees on standby may be eligible to receive call-in pay, overtime, and double-time for actual hours
worked as provided and subject to approval as identified in this policy.
Electric Department
Electric Department employees, as determined by the Department Supervisor or General Manager, shall
be assigned on a rotating weekly basis to standby responsibilities on weekends and holidays. Employees
assigned to standby shall remain available for contact and shall be able to respond to a call within a
maximum of 20 minutes. Employees assigned to standby must remain capable of safely performing
assigned work if called in and may not consume alcoholic beverages while on standby. Electric
Department employees assigned to standby shall receive twelve (12) hours of straight-time pay for each
weekend standby period, defined as beginning at the end of the employee's work week and continuing
through the employee's scheduled start time on Monday. An employee assigned to standby for an
observed weekday holiday shall receive five (5) hours of straight-time pay. While on standby, the normal
call-in compensation provisions shall apply for actual hours worked.
Water/Sewer Collection and Distribution Department
Water/Sewer Collection and Distribution employees, as determined by the Department Supervisor or
General Manager, shall be assigned on a rotating weekly basis to standby responsibilities on weekends
and holidays. Employees assigned to standby shall remain available for contact and shall be able to
respond to a call within a maximum of 30 minutes. Employees assigned to standby must remain capable
of safely performing assigned work if called in and may not consume alcoholic beverages while on
standby. Water/Sewer Collection and Distribution employees assigned to standby shall receive nine (9)
hours of straight-time pay for each weekend standby period, defined as beginning at the end of the
employee's work week and continuing through the employee's scheduled start time on Monday. An
employee assigned to standby for an observed weekday holiday shall receive four (4) hours of straight-
time pay. While on standby, the normal call-in compensation provisions shall apply for actual hours
worked.
Office
On the day following scheduled disconnections, an office staff employee, as determined by the
Department Supervisor or General Manager, shall be assigned to standby when customers remain
disconnected. The employee assigned to standby shall have Utility-related phone calls forwarded to a
Utility-provided phone and shall remain available for contact from the end of the employee's scheduled
workday on the day of disconnections until the start of the employee's next scheduled workday. Office
employees assigned to standby shall receive three (3) hours of straight-time pay. Employees assigned to
standby must remain capable of safely performing assigned work if called and may not consume
alcoholic beverages while on standby. If an employee receives a Utility-related call while on standby that
requires work to be performed but does not require the employee to physically restore service, the
employee shall receive overtime compensation for the applicable work performed. If a call requires the
employee to physically restore service, the employee shall receive applicable call-in pay and overtime
compensation in accordance with the Utility's normal compensation provisions.
WAUPUN UTILITIES
CELL PHONE REIMBURSEMENT POLICY
1. Purpose
Waupun Utilities recognizes that mobile communication is an important component of daily operations
and supports the continuity of Utility operations. Employees may be required to use a personal cell
phone to support communication, access Utility systems and platforms, receive notifications, and
respond to operational needs during and outside of regular work hours.
To recognize the business use of personal cell phones, Waupun Utilities will provide eligible employees
with a monthly cell phone reimbursement. The reimbursement is intended to offset a portion of the
employee’s personal cell phone service costs associated with business-related use.
2. Eligibility
All Waupun Utilities employees are eligible for the monthly cell phone reimbursement when their
position requires or reasonably benefits from the use of a personal cell phone for Utility business.
Business-related cell phone use may include, but is not limited to:
• Communication with Utility employees, supervisors, and other departments during regular work
hours;
• Communication related to Utility operations outside of regular work hours;
• Receiving and responding to notifications through the Utility’s Outage Management System
(OMS) or other Utility systems;
• Accessing Utility applications, platforms, and systems, including two-factor authentication;
• Receiving operational alerts, alarms, or notifications, including those associated with Utility
treatment facilities;
• Communication necessary to support emergency response and continuity of Utility operations;
and
• Other work-related communication or mobile access necessary to perform assigned job duties.
3. Reimbursement
Eligible employees will receive a monthly cell phone reimbursement of $30.00.
The reimbursement will be processed through payroll and paid by direct deposit with the employee’s first
payroll deposit of each month.
The reimbursement is intended to contribute toward the employee’s personal cell phone service costs and
is not intended to cover the employee’s entire cell phone bill.
Employees receiving the reimbursement are responsible for maintaining an active cell phone service plan
and a functioning mobile device capable of supporting the business-related communication and
applications required for their position.
4. Business Use
Employees receiving a cell phone reimbursement are expected to use reasonable judgment when using
their personal cell phone for Utility business and to follow all applicable Utility policies and procedures.
WAUPUN UTILITIES
CELL PHONE REIMBURSEMENT POLICY
The cell phone reimbursement does not, by itself, change an employee’s regular work schedule, establish
an expectation of after-hours work, or modify applicable overtime, standby, call-in, or other
compensation provisions.
Employees should continue to follow all Utility policies and procedures regarding work hours, standby,
call-ins, overtime, emergency response, and use of Utility systems.
5. Changes in Eligibility
An employee’s eligibility for the cell phone reimbursement may be reviewed or discontinued when the
employee’s employment with Waupun Utilities ends or if this policy is amended or discontinued.
Waupun Utilities reserves the right to modify the reimbursement amount, eligibility requirements, or this
policy as operational needs and business practices change.
TO: Waupun Utilities Commissioners
FROM: Jeff Stanek, CPA, Finance Director
DATE: October 12, 2026
SUBJECT: Draft 2027 Waupun Utilities Budget
This memorandum provides a high-level analysis of the draft 2027 budget for Waupun Utilities.
A summary schedule is provided along with detailed cash flows, operating income, expense,
and plant schedules for each utility.
The overall budget is forecasted to increase $4,402,300 or 22.0% over the 2026 budget largely
due to a new customer in the industrial park, debt financing and utility construction of a new
electric substation.
The 2027 budget includes the following:
Average 3.0% cost of living structural wage adjustment and for ecasted step increases in
accordance with the Commission approved compensation study
Health insurance cost increase of 1.0% for 2027
All other operation and maintenance expenses include a 3.0% in flationary increase
based on recent Consumer Pricing Indices (CPI)
A full year of wages & benefits for recently hired Electric ap prentice & Water/Sewer
Operator with the addition of a new Utility Tech employee split between the utilities to
focus on locating and other operational tasks
Revenues forecasted conservatively based upon recent historica l consumption data,
additional large customer services in the industrial park and new multi-family
development
Capital equipment and vehicle replacements for assets past the ir useful life
Debt financing and construction associated with a new Business Park substation and
beginning to convert a majority of the remaining 4 kV electric distribution system to 12
kV.
Potential to pay off existing water debt in the amount of $2,0 15,000 with cash on-hand.
An analysis by utility follows.
ELECTRIC UTILITY
The 2027 budget is forecasted to increase $4,421,300, or 33.1%, from the 2026 budget. The
change is primarily due to an increase in capital improvement spending associated with the new
business park substation and system conversion projects. The multi-year project will be
financed with revenue bond debt and will convert a majority of the remaining 4 kV distribution
system to 12 kV. The project is estimated to cost $7.0 – 7.6 million with $3.9 million anticipated
to be allocated or spent in 2027. New interest payments on the debt financing are budgeted to
be $292,600 with no principal payments forecasted for 2027. Additionally, purchase power
expense is budgeted to increase from serving multiple services for the new large customer
located in the industrial park. Electric rates were effective April 1, 2023 and may be modified in
2027 with the submission of the Test Year 2027 Electric Rate Case to the PSCW late in 2026 to
support the new substation construction.
The capital budget includes:
$280,000 for a new storage facility at the admin building (70% E, 30% W)
$85,000 to replace a small dump truck
$60,000 to add a small excavator to replace the aging trenchin g machine
$14,400 in wire transportation & handling equipment
$10,000 for routine meter additions & replacements
$53,600 for the electric utility’s share of administrative off ice replacements including
server, security cameras, conference room equipment and office carpeting & painting
$7,000 for tool and safety equipment replacements
The construction budget includes:
$3,951,000 in substation equipment procurement, engineering an d construction
$221,300 to rebuild overhead lines
$317,600 for voltage conversion
$50,000 for transformers
All other items listed for construction are routine in nature.
Non-routine or new expenses included in the operating budget are the following:
$86,000 in wages & benefits for a new electric apprentice (ful l year) and $36,200 for
electrics share of a new Utility Tech position (70%) split with the other utilities
$31,300 in PSCW costs related to the TY2027 electric rate case
WATER UTILITY
The 2027 budget is forecasted to decrease ($190,900) or 7.2% over the 2026 budget. There are
no planned major street reconstruction projects budgeted for 2027 which accounts for the
budget decrease from the prior year.
The capital budget includes the following:
$120,000 for a new storage facility at the admin building (70% E, 30% W)
$20,000 for chemical system upgrades at the water treatment fa cility
$7,500 to replace 5 water loggers
$8,500 for trailer wagon replacements & $2,500 for WTF floor s crubbing machine (50%)
$22,200 for routine meter additions & replacements including n ew developments
$22,500 to replace a ½ ton pick-up truck (50% portion)
$40,200 for the water utility’s share of administrative office replacements including
server, security cameras, conference room equipment and office carpeting & painting
There were no new, non-routine expenses included in the operating budget and no large
construction projects anticipated for the capital budget.
The water utility has postponed its plans for construction of a new water well due to the denial of
the Well #6 application from the WDNR. Instead, the water is rehabbing existing Wells #2 & #3
in 2026 to extend the life of these assets. As a result, the water utility has the opportunity to pay
off its existing $2,015,000 in debt from the 2019 Revenue Bonds with cash on-hand. A final
determination will be assessed with the completion of the final 2027 budget.
SEWER UTILITY
The 2027 budget is forecasted to increase $171,900 or 4.3% over the 2026 budget.
The capital budget includes the following:
$275,000 to replace the failing electrical breakers WWTP
$17,500 to replace the raw sludge pipeline in the digester bui lding
$27,500 for final clarifier launder covers
$40,000 for an automated transfer switch SCADA integration wit h the new generator
$25,000 to replace two samplers
$10,000 for an MCC-A transformer replacement in the pump & blo wer building
$22,500 to replace a ½ ton pick-up truck (50% portion)
40,200 for the sewer utility’s share of administrative office replacements including
server, security camera, conference room equipment and office carpeting & painting
The construction and engineering budget includes:
$85,000 for cured-in-place sewer main lining
Non-routine and new expenses included in the operating budget are the following:
$30,000 new annual ABNR centrifuge re-build expenses
$6,500 new annual expenses for pigging system replacements
$16,000 in biotower tuck-pointing.
We will discuss these schedules in greater detail on Monday, November 9
th.
Waupun Utilities
2027 Budget Summary
Electric Water Sewer Total
Sources of Cash
Operating Revenues 13,407,415 $ 2,685,767 $ 3,922,489 $ 20,015,671 $
Debt Financing 3,951,000 - - 3,951,000
Equipment Replacement Funds 85,000 - - 85,000
Interest Earnings 40,000 50,000 40,000 130,000
Total Sources of Cash 17,483,415 2,735,767 3,962,489 24,181,671
Uses of Cash
Operation and Maintenance Expenses 11,921,299 1,354,298 2,344,900 15,620,497
Depreciation on Meters - - 32,500 32,500
Taxes 405,949 391,816 - 797,765
Debt Service
2019 Refunding Revenue Bonds - 424,413 - 424,413
2020/21 USDA Revenue Bonds - - 896,961 896,961
2026 Revenue Bonds 292,639 - - 292,639
Plant Additions and Construction 1,193,437 243,363 545,163 1,981,963
Plant - Electric Substation 3,951,000 - - 3,951,000
Vehicle Replacement Funding - - - -
Equipment Replacement Funding - 50,000 250,000 300,000
Debt Reserve Account Funding - - 90,000 90,000
Removal Expenses 10,000 - - 10,000
Total Uses of Cash 17,774,324 2,463,890 4,159,524 24,397,738
Cash Applied to (Used from) Reserves (290,909)$ 271,877 $ (197,035) $ (216,067) $
2026 Budget - Uses of Cash 13,353,044$ 2,654,762 $ 3,987,631 $ 19,995,437 $
$ Difference 4,421,280$ (190,872) $ 171,893 $ 4,402,301$
% Difference 33.11% -7.19% 4.31% 22.02%
Waupun Utilities
2027 Budget - Electric
Cash Flow
Debt Test Year
Reserves Financing Total 2023 Schedule
Sources of Cash
Total Operating Revenues 13,407,415 $ - $ 13,407,415$ 12,110,971 $ Operating income schedule
2026 Revenue Bonds (Substation) - 7,000,000 7,000,000
Vehicle Replacement Fund 85,000 - 85,000 Current equipment purchases
Interest Earnings 40,000 - 40,000 -
Total Sources of Cash 13,532,415 7,000,000 20,532,415 12,110,971
Uses of Cash
Total Operation and Maintenance Expenses 11,921,299 - 11,921,299 10,531,065 Operating income schedule
Taxes 405,949 - 405,949 351,986 Operating income schedule
Debt Service - -
2026 Revenue Bonds 292,639 - 292,639 - Estimated repayment schedule (I n
Plant Additions and Construction - Reserves 1,193,437 - 1,193,437 692,500 Plant/Construction schedule
Plant Additions and Construction - Debt Financed - 3,951,000 3,951,000 -
Vehicle Replacement Fund - - - - Annual funding
Removal Expenses 10,000 - 10,000 10,000 Prior year estimate
Total Uses of Cash 13,823,324 3,951,000 17,774,324 11,585,551
Cash Applied to / (Used from) Electric Reserves (290,909)$ 3,049,000 $ 2,758,091 $ 525,420 $
2027 Budget
EB-1
Waupun Utilities
2027 Budget - Electric
Operating Income
Account 2027
Number OPERATING REVENUES Budget Source
Sales of Electricity
440 Residential 4,400,391 $ Consumer Analysis
441 General service (Commercial) 1,539,322 Consumer Analysis
442 Small power - TOD 1,442,242 Consumer Analysis
443.1 Large power - TOD 2,315,265 Consumer Analysis
443.2 Industrial power - TOD 1,250,737 Consumer Analysis
443.3 Large Industrial power - TOD 2,183,036 Consumer Analysis
444 Street & security lighting 151,344
Separate Analysis
Total Sales of Electricity 13,282,338
Other
422 Sale of Equipment -
450 Forfeited discounts 15,700 A nnualized '26 Actuals
451 Miscellaneous service revenue 9,200 A nnualized '26 Actuals
454 Rent from electric pr operty 100,177 Pole contact and tower rent
Total Operating Revenues 13,407,415
OPERATING EXPENSES
Operation and Maintenance
555 Purchased power 10,555,737 Ex pense Schedule
580 Operation and supervision and engineering 120,531 Ex pense Schedule
582 Station 14,428 Ex pense Schedule
583 Overhead line 42,678 Ex pense Schedule
584 Underground line 103,465 Ex pense Schedule
585 Street lighting and signal system 10,275 Ex pense Schedule
586 Meter 17,955 Ex pense Schedule
587 Customer installations 116 Ex pense Schedule
588 Miscellaneous 58,838 Ex pense Schedule
592 Maintenance of station equipment 11,583 Ex pense Schedule
593 Maintenance of overhead lines 119,460 Ex pense Schedule
594 Maintenance of underground lines 82,028 Ex pense Schedule
595 Maintenance of line transformers 153 Ex pense Schedule
596 Maintenance of street lighting 10,486 Ex pense Schedule
597 Maintenance of meters 10,266 Ex pense Schedule
901 Supervision office 15,213 Ex pense Schedule
902 Meter reading labor 11,949 Ex pense Schedule
903 Customer records and collection 109,054 Ex pense Schedule
904 Uncollectible accounts 300 Ex pense Schedule
913 Sales/advertising 907 Ex pense Schedule
920 Administrative and general salaries 94,431 Ex pense Schedule
921 Office supplies 85,181 Ex pense Schedule
923 Outside services employed 54,159 Ex pense Schedule
924 Property insurance 31,141 Ex pense Schedule
925 Injuries and damages 14,757 Ex pense Schedule
926 Employee pensions and benefits 282,693 Ex pense Schedule
928 Regulatory commission 31,320 Ex pense Schedule
930 Miscellaneous 10,821 Ex pense Schedule
932 Maintenance of general plant 21,374 Expense Schedule
Total Operation and Maintenance Expenses 11,921,299
403 Depreciation 707,627 Ex pense Schedule
408 Taxes 405,949 Expense Schedule
Total Operating Expenses 13,034,875
OPERATING INCOME 372,540$
EB-2
Waupun Utilities
2027 Budget - Electric
Expenses
Account Actual Actual Actual YTD Budget Budget
Number 2023 2024 2025 3 yr Average 7/ 31/2026 2026 2027 Budget Notes/Source
OPERATION AND MAINTENANCE EXPENSES
555 Purchased power 8,514,648 $ 8,201,269 $ 9,149,208 $ 8,621,708 $ 5,935,341 $ 9,295,856 $ 10,555,737 $ Separate Analysis
580 Operation, supervision and engineering 45,451 53,182 64,471 54,368 29,215 79,467 120,531 Separate Analysis
582 Station 12,207 10,930 14,008 12,382 8,400 13,639 14,428 Actual 2025 with inflation
583 Overhead line 24,838 33,221 47,569 35,209 23,966 34,218 42,678 Annualized YTD 7/26 with inflation
584 Underground line 30,847 81,284 77,265 63,132 42,006 105,618 103,465 Annualized YTD 7/26 with inflation + 1/3 of
new apprentice new salary
585 Street lighting and signal system 6,537 8,430 8,755 7,907 5,791 7,452 10,275 Annualized YTD 7/26 with inflation
586 Meter 11,203 14,127 17,432 14,254 8,194 17,132 17,955 Actual 2025 with inflation
587 Customer installations 197 141 - 113 - 257 116 3 Yr Average with inflation
588 Miscellaneous 27,958 44,905 57,124 43,329 7,410 49,891 58,838 Actual 2025 with inflation
592 Maintenance of station equipment 3,438 3,088 5,266 3,930 6,497 5,813 11,583 Annualized YTD 7/26 with inflation
593 Maintenance of overhead lines 43,721 123,329 97,396
88,149 113,496 162,564 119,460 3 Yr Avg w/ inflation + tree contractor + 1/3 of
new Apprentice
594 Maintenance of underground lines 14,679 29,014 19,853 21,182 9,141 47,027 82,028 Annualized YTD 7/26 with inflation + 1/3 of
new Apprentice + 70% of Utility Tech
595 Maintenance of line transformers - - 445 148 - 41 153 3 Yr Average with inflation
596 Maintenance of street lighting 5,077 9,187 7,213 7,159 5,903 7,952 10,486 Annualized YTD 7/26 with inflation
597 Maintenance of meters 3,960 7,156 9,967 7,028 3,616 10,087 10,266 Actual 2025 with inflation
901 Supervision office 16,105 19,134 23,415 19,551 11,619 14,471 15,213 Separate Analysis
902 Meter reading labor 9,240 10,222 11,335 10,266 7,105 11,278 11,949 WPPI Shared Service Estimate
903 Customer records and collection 97,843 117,327 98,655 104,608 61,169 107,005 109,054 3 Yr Average with inflation
904 Uncollectible accounts 648 - 216 288 257 225 300 3 Yr Average with inflation
913 Sales/advertising 856 801 986 881 5,401 839 907 3 Yr Average with inflation
920 Administrative and general salaries 65,150 69,138 85,058 73,115 48,600 88,808 94,431 Separate Analysis
921 Office supplies and expenses 76,559 68,429 76,937 73,975 36,770 67,834 85,181 Separate Analysis
923 Outside services employed 36,983 32,407 36,337 35,242 35,130 58,640 54,159 Separate Analysis
924 Property insurance 8,632 11,962 10,845 10,480 21,200 14,432 31,141 Separate Analysis
925 Injuries and damages 8,833 7,587 6,823 7,748 8,302 14,198 14,757 Separate Analysis
926 Employee pensions and benefits 196,512 233,133 242,745 224,130 154,938 258,664 282,693 Separate Analysis, excludes GASB 68 & 75,
apprentice training program
928 Regulatory commission 30,408 318 - 10,242 1,025 - 31,320 Actual 2023 Rate Study Cost + Inflation
930 Miscellaneous 11,639 9,356 7,790 9,595 4,812 8,017 10,821 Separate Analysis
932 Maintenance of general plant 21,588 11,636 28,285 20,503 12,641 16,903 21,374 3 Yr Average with inflation
TOTAL OPERATION AND MAINTENANCE EXPENSES 9,325,757 9,210,711 10,205,395 9,580,621 6,607,944 10,498,329 11,921,299
403 Depreciation 652,660 667,084 703,404 674,383 410,184 703,172 707,627 Separate Analysis
408 Taxes 300,655 316,192 365,914 327,587 190,205 331,032 405,949 Separate Analysis
TOTAL OPERATING EXPENSES 10,279,072$ 10,193,988 $ 11,274,713 $ 10,582,591 $ 7,208,333 $ 11,532,533 $ 13,034,875 $
EB-3
Waupun Utilities
2027 Budget - Electric
Plant Additions and Construction
Proposed
Budget
Plant Additions:
Meters 10,000$
Replace One-Ton Dump Truck (Unit #149) E - 100% 85,000
Pole Shed @ Admin Bldg. (E-70%, W-30%) 280,000
Spider Wire System E - 100% 14,000
Small scale excavator w/ attachments (Dingo) E - 100% 60,000
Office Admin Upgrades (E-40%, W-30%,S-30%) 45,550
Office Server Upgrade (E-40%, W-30%,S-30%) 8,000
Misc. Tools, Safety Equipment & Testing E - 100% 7,000
Total Plant Additions 509,550$
Routine Construction:
Rebuild overhead lines 221,250 $
Underground cable replacements 75,000
Voltage converstion 317,637
LED street lighting 10,000
Transformers 50,000
Services 10,000
Total Construction (Reserve-financed) 683,887$
Plant Additions and Construction (Reserves) 1,193,437 $
Substation Construction (Debt-financed) 3,773,000
Substation Engineering (Debt-financed) 178,000
Total Construction (Debt-financed) 3,951,000 $
Total Plant Additions and Construction 5,144,437 $
EB-4
Waupun Utilities
2027 Budget - Water
Cash Flow - Budget to Test Year 2007 Comparison
2027 Test Yea
r
Budget 2007 $ Difference % Difference
Sources of Cash
Total Operating Revenues 2,685,767 $ 2,545,864 $ 139,903 $ 5.50%
Sale of Equipment - - - n/a
Interest Earnings 50,000 50,000 - n/a
Total Sources of Cash 2,735,767 2,595,864 139,903 5.39%
Uses of Cash
Total Operation and Maintenance Expenses 1,354,298 838,321 515,977 61.55%
Taxes 391,816 306,875 84,941 27.68%
Debt Service
2014 Revenue Bonds - 907,610 (907,610) n/a
2019 Revenue Bonds - - - n/a
2019 Refunding Revenue Bonds 424,413 - 424,413 n/a
Equipment Replacement Funds - - - n/a
Vehicle Equipment Replacement Funding 50,000 - 50,000 n/a
Plant Additions and Construction 243,363 267,700 (24,337) -9.09%
Total Uses of Cash 2,463,889 2,320,506 143,383 6.18%
Cash Applied to / (Used From) Water Reserves 271,878$ 275,358 $ (3,480) $ -1.26%
WB-1
Waupun Utilities
2027 Budget - Water
Operating Income - Budget to Test Year 2007 Comparison
Accoun
t 2027 Test Year
Number Budget 2007 $ Difference % Differenc e
OPERATING REVENUES
Sales of Water
461.1 Residential 1,229,658 $ 1,286,370 $ (56,712) $ -4.41%
461.2 Multifamily 184,168 - 184,168 n/a
461.3 Commercial 257,889 359,540 (101,651) -28.27%
461.4 Industrial 64,701 147,739 (83,038) -56.21%
462 Private fire protection 47,294 22,812 24,482 107.32%
463 Public fire protection 782,289 674,671 107,618 15.95%
464 Public authorit y 52,590 44,738 7,852 17.55%
Total Sales of Water 2,618,59 0 2,535,870 82,720 3.26%
Other
422 Sale of equipment - - - 0.00%
470 Forfeited discounts 4,100 4,791 (691) -14.42%
471 Miscellaneous service revenue 3,500 1,569 1,931 123.07%
472 Rent from water property 19,677 - 19,677 n/a
474 Other water revenue s 39,900 3,634 36,266 997.96%
Total Operating Revenues 2,685,767 2,545,864 139,903 5.50%
OPERATING EXPENSES
Operation
Source of Supply
601 Supervision 254 4,000 (3,746) -93.66%
611 Structures 274 - 274 n/a
614 Wells - 2,000 (2,000) -100.00%
Pumping
620 Supervision and engineering - 1,000 (1,000) -100.00%
623 Power for pumping 105,753 95,399 10,354 10.85%
624 Pumping labor 9,133 32,619 (23,486) -72.00%
626 Miscellaneous 300 4,000 (3,700) -92.50%
631 Structures 111 1,000 (889) -88.94%
633 Pumping equipment 2,109 500 1,609 321.82%
Water Treatment
640 Supervision and engineering 126,474 46,270 80,204 173.34%
641 Chemicals 43,234 63,469 (20,235) -31.88%
642 Operation labor 195,869 71,839 124,030 172.65%
643 Miscellaneous 1,700 5,120 (3,421) -66.81%
651 Structures 200 - 200 n/a
652 Treatment equipment 13,405 19,714 (6,309) -32.00%
Transmission and Distribution
662 Transmission and Distribution Lines 14,502 - 14,502 n/a
663 Meter 11,106 8,958 2,148 23.98%
664 Customer installations 28,400 - 28,400 n/a
665 Miscellaneous expenses 35,315 - 35,315 n/a
671 Structures - - - n/a
672 Distribution reservoirs 47,832 58,747 (10,915) -18.58%
673 Transmission and distribution mains 83,785 54,463 29,322 53.84%
675 Services 54,396 30,216 24,180 80.02%
676 Meters 16,253 7,269 8,984 123.59%
677 Hydrants 13,046 16,677 (3,631) -21.77%
WB-2
Waupun Utilities
2027 Budget - Water
Operating Income - Budget to Test Year 2007 Comparison
Accoun
t 2027 Test Year
Number Budget 2007 $ Difference % Differenc e
Customer Accounts
901 Supervision 15,213 17,500 (2,287) -13.07%
902 Meter reading labor 9,498 12,362 (2,864) -23.17%
903 Accounting and collecting labor 98,458 44,652 53,806 120.50%
904 Uncollectible accounts - 200 (200) -100.00%
Administrative and General
920 Salaries 79,218 13,523 65,695 485.80%
921 Office supplies 52,605 42,686 9,919 23.24%
923 Outside services employed 46,113 32,000 14,113 44.10%
924 Property insurance 21,687 11,553 10,134 87.72%
925 Injuries and damages 12,245 13,600 (1,355) -9.96%
926 Employee pensions and benefits 171,067 116,352 54,715 47.03%
928 Regulatory commission - 1,000 (1,000) -100.00%
930 Miscellaneous 1,766 800 966 120.72%
932 General plan t 42,977 8,833 34,144 386.56%
TOTAL OPERATION AND MAINTENANCE 1,354,298 838,321 515,977 61.55%
403 Depreciation 642,195 490,129 152,066 31.03%
408 Taxes 391,816 306,875 84,941 27.68%
TOTAL OPERATING EXPENSES 2,388,309 1,635,325 752,984 46.04%
OPERATING INCOME 297,458$ 910,539 $ (613,081)$ -67.33%
WB-2
Waupun Utilities
2027 Budget - Water
Expenses
Account Actual
Actual Actual 3 Yr YTD Budget Budget
Number OPERATING EXPENSES 2023 2024 2025 Average 7/31/2026 2026 2027 Budget Notes/Source
OPERATION AND MAINTENANCE
Source of Supply
601 Operation Labor and Expenses 195$ 544 $ - $ 246 $ 227 $ 298 254 3 yr. avg. with inflation
611 Structures and Improvements 798 - - 266 - 274 274 3 yr. avg. with inflation
614 Wells and Springs 990 4,826 2,419 2,745 2,739 - - Well Rehab (every 10 years)
Pumping
620 Operation Supervision and engineering - - - - - - - Historical trends
623 Fuel or Power Purchased for Pumping 80,846 74,531 78,901 78,093 59,893 80,691 105,753 Annualized YTD 7/26 with inflation
624 Pumping Labor and Expenses 1,782 13,515 11,303 8,867 5,373 5,462 9,133 3 yr. avg. with inflation
626 Miscellaneous Expenses - 36 - 12 38 300 300 Historical trends
631 Structures and Improvements 297 25 - 107 - 412 111 3 yr. avg. with inflation
633 Pumping Equipment 2,825 3,318 - 2,048 2,373 2,290 2,109 3 yr. avg. with inflation
Water Treatment
640 Operation Supervision and Engineering 63,275 98,385 112,265 91,308 42,347 62,390 126,474 Separate Analysis
641 Chemicals 44,776 36,751 44,397 41,975 22,787 45,852 43,234 3 yr. avg. with inflation
642 Operation Labor and Expenses 91,879 102,192 170,390 121,487 110,247 164,158 195,869 Annualized YTD 7/26 with inflation
643 Miscellaneous Expenses 1,781 1,548 1,621 1,650 981 1,734 1,700 3 yr. avg. with inflation
651 Structures and Improvements - - 322 107 - 200 200 Historical trends
652 Maintenance of Water Treatment
Equipment 1,635 196,920 25,951 74,835 372 13,014 13,405 2026 budget with inflation
Transmission and Distribution
662 Transmission and Distribution Lines 21,946 6,947 13,347 14,080 468 13,309 14,502 3 yr. avg. with inflation
663 Meter 4,001 4,543 5,428 4,657 6,222 5,675 11,106 Annualized YTD 7/ 26 with inflation
664 Customer Installations 27,672 27,672 27,048 27,464 15,778 28,280 28,400 2026 budget with inflation
665 Miscellaneous expenses 19,552 28,258 28,847 25,552 19,761 24,227 35,315 Annualized YTD 7/ 26 with inflation
671 Maintenance of Structures and
Improvements - - - - - - - Historical trends
672 Maintenance of Distribution Reservoirs 43,092 52,405 43,092 46,196 28,000 48,000 47,832 Separate Analysis
673 Maintenance of Transmission and
Distribution Mains 72,409 50,258 48,830 57,166 47,352 76,335 83,785 Annualized YTD 7/ 26 with inflation
675 Services 44,114 41,056 50,083 45,084 28,925 39,740 54,396 3 yr. avg. with inflation + 15% Util Tech
676 Meters 3,193 1,919 1,884 2,332 9,185 2,230 16,253 Annualized YTD 7/ 26 with inflation
677 Hydrants 5,425 15,406 17,168 12,666 3,457 12,301 13,046 3 yr. avg. with inflation
Customer Accounts
901 Supervision 13,397 15,078 16,352 14,942 9,309 14,471 15,213 Separate Analysis
902 Meter reading labor 7,713 8,468 8,531 8,237 5,797 9,413 9,498 WPPI provided estimates for 2027
903 Customer Accounts 86,966 102,763 87,105 92,278 55,276 90,534 98,458 Annualized YTD 7/ 26 with inflation
904 Uncollectible accounts - - 105 35 109 - - Historical trends
WB-3 Page 4 of 6
Waupun Utilities
2027 Budget - Water
Expenses
Account Actual
Actual Actual 3 Yr YTD Budget Budget
Number OPERATING EXPENSES 2023 2024 2025 Average 7/31/2026 2026 2027 Budget Notes/Source
Administrative and General
920 Salaries 53,743 56,934 62,205 57,627 38,731 74,337 79,218 Separate Analysis
921 Office supplies 46,615 49,171 51,073 48,953 31,402 50,646 52,605 Actual 2025 with Inflation
923 Outside services employed 41,888 69,164 23,257 44,770 23,454 54,845 46,113 3 yr. avg. with inflation
924 Property insurance 15,525 17,602 16,579 16,569 11,378 20,457 21,687 Separate Analysis
925 Injuries and damages 10,682 8,580 9,554 9,605 6,849 11,646 12,245 Separate Analysis
926 Employee pensions and benefits 124,538 134,366 158,637 139,180 95,770 186,850 171,067 Separate Analysis, excludes GASB 68 & 75
928 Regulatory commission - - - - - - - No PSC charges anticipated
930 Miscellaneous 3,509 543 1,091 1,714 792 1,685 1,766 3 yr. avg. with inflation
932 Maintenance of general plant 22,831 62,261 40,085 41,726 14,724 37,001 42,977 3 yr. avg. with inflation
959,890 1,285,985 1,157,870 1,134,582 700,114 1,179,057 1,354,298
403 Depreciation 569,126 549,014 545,506 554,549 344,570 626,864 642,195 Based on estimated plant balances
408 Taxes 336,766 336,686 399,234 357,562 198,768 317,190 391,816 Separate Analysis
TOTAL OPERATING EXPENSES 1,865,782$ 2,171,685 $ 2,102,610 $ 2,046,692 $ 1,243,452 $ 2,123,111 $ 2,388,309 $
TOTAL OPERATION AND MAINTENANCE
WB-3 Page 5 of 6
Waupun Utilities
2027 Budget - Water
Plant Additions and Construction
Proposed
Budget
Plant Additions:
Water meters & meter modules 22,200$
Chemical Scale Replacements 20,000
Pole Shed @ Admin Bldg. (E-70%, W-30%) 120,000
Replace 5 Water Loggers 7,500
Trailer Wagon Replacements (S-50%,W-50%) 8,500
Pick-up Truck Replacment - 1/2 ton (Unit #146) (S-50%,W-50%) 22,500
Floor Scrubbing Machine (S-50%,W-50%) 2,500
Office Admin Upgrades (E-40%, W-30%,S-30%) 34,163
Office Server Upgrade (E-40%, W-30%,S-30%) 6,000
Total Plant Additions 243,363 $
Construction: -
Total Plant Additions and Construction 243,363 $
WB-4
Waupun Utilities
2027 Budget - Sewer
Cash Flow - Budget to TY 2025 Comparison
TY 2025
2027 Revenue
Budget Requirement $ Difference
Sources of Cash
Total Operating Revenues 3,922,489 $ 4,033,561 $ (111,072) $
Equipment replacement funds - - -
Sale of Equipment - - -
Investment Income 40,000
40,000 -
Total Sources of Cash 3,962,489 4,073,561 (111,072)
Uses of Cash
Total Operation and Maintenance Expenses 2,344,900 2,304,079 40,821
Debt Service
2020/21 USDA Bonds 896,961 896,982 (22)
Debt reserve account 90,000 90,000 -
Depreciation on meters 32,500 32,500 -
USDA Equipment Replacement Account Funding (A) 250,000 250,000 -
Vehicle Replacement Funding - - n/a
Plant Additions and Construction 545,163 500,000 45,163
Total Uses of Cash 4,159,524 4,073,561 85,963
Cash Applied to / (Used From) Sewer Reserves (197,035)$ - $ (197,035)$
(A) This fund is required by the USDA as a condition of obtaining the 2020/21 Sewer Revenue Bonds. The
amounts being set aside annually will be used to fund future replacements of specific ABNR short-lived
assets.
SB-1
Waupun Utilities
2027 Budget - Sewer
Operating Income - Budget to TY 25 Comparison
TY 2025
Account 2027 Revenue
Numbe
r Budget Requirement $ Difference % Difference
OPERATING REVENUES
Wastewater Revenues
722.1 Residential 1,182,750 $ 1,175,350 $ 7,400 $ 0.63%
722.2 Commercial 470,393 457,155 13,238 2.90%
722.3 Industrial 55,437 33,530 21,907 65.34%
722.4 Public authorit y 1,884,096 2,079,066 (194,970) -9.38%
Total Metered Revenue 3,592,677 3,745,101 (152,424) -4.07%
Other
722 Sale of equipment - - - 0.00%
725 Other sewerage services 172,900 133,500 39,400 29.51%
731 Forfeited discounts 3,600 3,800 (200) -5.26%
735 Miscellaneous operating revenues 153,312 151,160 2,152 1.42%
Total Operating Revenues 3,922,489 4,033,561 (111,072) -2.75%
OPERATING EXPENSES
Operation
820 Supervision and labor 126,474 146,400 (19,926) -13.61%
821 Power for pumping 435,506 361,206 74,300 20.57%
823 Chemicals 211,124 262,000 (50,876) -19.42%
827 Operating supplies 69,968 81,452 (11,484) -14.10%
828 Laboratory labor 72,814 74,663 (1,849) -2.48%
829 Laboratory supplies 39,024 51,046 (12,022) -23.55%
Total Operating 954,910 976,767 (21,857) -2.24%
Maintenance
831 Sewage collection system 179,712 143,452 36,260 25.28%
832 Pumping equipment 8,943 7,902 1,041 13.17%
833 Treatment plant equipment 233,591 241,008 (7,417) -3.08%
834 General plant 189,597 177,610 11,987 6.75%
Total Maintenance 611,843 569,972 41,871 7.35%
Customer Accounts Expenses
840 Accounting and collecting 152,262 154,080 (1,818) -1.18%
842 Meter reading 9,191 8,675 516 5.95%
Total Customer Accounts 161,453 162,755 (1,302) -0.80%
Administrative and General Expenses
850 General office salaries 79,218 67,470 11,748 17.41%
851 General office supplies 86,263 91,860 (5,597) -6.09%
852 Outside services 80,523 90,738 (10,214) -11.26%
853 Property insurance 69,580 62,272 7,308 11.74%
854 Employee pensions and benefits 244,992 247,005 (2,013) -0.81%
856 Miscellaneous general 56,117 35,240 20,877 59.24%
Total Administrative and General 616,694 594,585 22,109 3.72%
Total Operation and Maintenance Expense 2,344,900 2,304,079 40,821 1.77%
403 Depreciation 1,814,329 1,781,463 32,866 1.84%
TOTAL EXPENSES 4,159,229 4,085,542 73,687 1.80%
OPERATING INCOME (236,740)$ (51,981) $ (184,759)$ 355.44%
SB-2
Waupun Utilities
2027 Budget - Sewer
Expenses
Account Actual Actual Actual YTD Budget Budget
Number 2023 2024 2025 7/31/2026 2026 2027 Budge t Notes / Source
820 Supervision and labor 133,683 $ 125,073$ 123,830$ 127,529$ 42,119 $ 62,390 $ 126,474$ S eparate Analysis
821 Power for pumping 235,989 294,880 376,247 302,372 256,970 386,626 435,506 Separate Analysis - Add'l greenhouse
lighting
823 Chemicals 213,743 105,693 173,834 164,423 88,211 238,100 211,124 S eparate Analysis
827 Operating supplies 37,447 33,375 40,242 37,021 38,296 83,900 69,968 S eparate Analysis
828 Laboratory labor 62,053 70,312 69,449 67,271 40,814 68,964 72,814 A nnualized YTD 7/26 with inflation
829 Laboratory supplies 30,851
48,890 39,915 39,885 22,101 44,642 39,024 Annualized YTD 7/26 with inflation
Total Operating 713,766 678,223 823,517 738,502 488,512 884,622 954,910
831 Sewage collection system 149,839 165,869 152,933 156,214 97,052 161,204 179,712 Annualized YTD 7/26 with inflation +
15% of Utility Tech
832 Pumping equipment 9,823 11,052 6,488 9,121 5,031 6,617 8,943 A nnualized YTD 7/26 with inflation
833 Treatment plant and equipment 157,926 174,098 226,666 186,230 102,553 256,832 233,591 A nnualized YTD 7/26 with inflation
834 General plant 177,181 212,830 162,212 184,074 99,356 178,042 189,597 3 yr. avg.with inflation
Total Maintenance 494,769 563,849 548,299 535,639 303,992 602,695 611,843
840 Accounting and collecting 138,497 149,154 136,037 141,229 85,675 140,273 152,262 A nnualized YTD 7/26 with inflation
842 Meter reading 7,108 7,863 7,886 7,619 5,514 9,109 9,191 WPPI provided estimates for 2026
Total Customer Accounts 145,605 157,017 143,923 148,848 91,189 149,382 161,453
850 Administrative and general salaries 55,211 57,855 66,452 59,839 41,671 74,337 79,218 S eparate analysis
851 General office supplies 73,078 63,879 75,495 70,817 48,855 65,644 86,263 A nnualized YTD 7/26 with inflation
852 Outside services 37,409 75,460 91,568 68,146 42,366 54,115 80,523 S eparate analysis
853 Insurance 41,286 60,404 58,620 53,437 37,069 66,843 69,580 S eparate analysis
854 Employee pensions and benefits 247,747 231,993 241,057 240,266 128,325 257,649 244,992 Separate Analysis, excludes GASB
68 & 75
856 Miscellaneous general 35,177 72,167 56,105 54,483 25,152 46,646 56,117 3 yr. avg.with inflation
Total Administrative and General 489,908 561,758 589,297 546,988 323,438 565,235 616,694
Total Operation and Maintenance 1,844,048 1,960,847 2,105,036 1,969,977 1,207,130 2,201,934 2,344,900
403 Depreciation 715,815 1,043,800 1,393,140 1,050,918 1,057,038 1,775,815 1,814,329 Separate analysis
TOTAL OPERATING EXPENSES 2,559,863$ 3,004,647 $ 3,498,176 $ 3,020,895 $ 2,264,168 $ 3,977,749 $ 4,159,229 $
Operating Expenses
Maintenance Expenses
Customer Accounts Expenses
Administrative and General Expenses
3 yr. Average
SB-2
Waupun Utilities
2027 Budget - Sewer
Plant Additions and Construction
Proposed
Budget
Plant Additions:
Item Building Utility Allocation
Replace WWTP Feeder Breakers entrie plant 275,000 $
Replace Raw Sludge Pipeline Digester Bldg #80 17,500
Final Clarifier Launder Covers Clarifiers Final 27,500
Automatic Transfer Switch (SCADA Integration) Generator 40,000
MCC-A Transformer Replacement Pump & Blower Bldg. 10,000
WWTP Samplers (2) Collection 25,000
Pick-up Truck Replacment - 1/2 ton (Unit #146) WWTP Bldg (S-50%,W-50%) 22,500
Floor Scrubbing Machine WWTP Bldg (S-50%,W-50%) 2,500
Office Admin Upgrades (E-40%, W-30%,S-30%) 34,163
Office Server Upgrade (E-40%, W-30%,S-30%) 6,000
Total Plant Additions 460,163$
Construction:
Sewer main CIPP lining 85,000
Total Plant Additions and Construction 545,163$
ER - Denotes Plant Addition is eligible to be funded through Equipment Replacement fund reserves
SB-2
TO: Waupun Utilities Commissioners
FROM: Steve Brooks, General Manager
DATE: October 12, 2026
SUBJECT: General Manager Report
Meeting with Industrial Customer
Waupun Utilities staff met with the leadership and operations team from a large
industrial customer to discuss our long-standing relationship and opportunities to
partner on replacing aging electric infrastructure. As part of the discussion, we also
explored relocating some of the existing electric equipment to improve system reliability
and strengthen the infrastructure for years to come. These efforts will help ensure
Waupun Utilities can continue providing reliable, affordable, and safe electric service.
WPPI Annual Conference
Mayor Bishop, Utility Commissioner Dan Siebers, and Utility staff attended the WPPI
Annual Meeting held at Blue Harbor Resort in Sheboygan, September 16–18. The
Annual Meeting brings together WPPI member utilities for education, industry updates,
and discussion of issues affecting the future of public power. Sessions and
presentations provide attendees with information on current utility trends, emerging
challenges and opportunities, regulatory and operational matters, and strategies for
continuing to provide safe, reliable, and affordable services.
Chris Jahn was recognized during the awards ceremony for successfully completing the
WPPI Joint Action Leadership program, a two-year commitment focused on developing
a deeper understanding of joint action and the value of WPPI's member partnership.
MEUW Member Roundtable
Staff attended the MEUW Member Roundtable held at the Juneau Community Center
on September 30 to exchange ideas and learn from one another about leading
practices, operating challenges, and emerging issues affecting municipal electric
utilities.
Community Outreach
Staff participated in the Waupun Senior Expo, held at the Waupun Community Center
on October 1. Prior to the start of the event, staff assisted with directing exhibitors to
their assigned booths, providing information about the day's events, and directing
parking. During the event, staff highlighted MyAccount alerts, energy assistance, Focus
on Energy energy-saving packs, and a door prize drawing for two annual memberships
to the Community Center for the 2027 season.
Waupun Utilities, the Waupun Community Center, and Energy Services Inc. are
partnering to host an in-person Wisconsin Home Energy Assistance Program (WHEAP)
application event at the Waupun Community Center on Friday, October 16. Energy
Services Inc. will be on site to assist customers with completing their applications and
enrolling in the program. Appointment slots have filled quickly, with only a few slots
remaining.
Public Power Week
In honor of Public Power Week, October 4–10, Waupun Utilities is celebrating
throughout the month of October through social media, a third-grade coloring contest for
students at CWC and Rock River Intermediate, and a Public Power Prize Drawing
Giveaway.
Third-grade students will color posters provided by Waupun Utilities throughout
October. The posters will be posted on social media during the first week of November
for voting. The third-grade class with the most votes at each school will win a pizza
party.
Utility customers are encouraged to enter for a chance to win one of ten prizes of their
choice. Customers can enter through an online form on the Waupun Utilities website or
by returning the bottom portion of the utility bill insert by mail, in person, or by email.
Winter Shut-off Moratorium
The winter shut-off moratorium in Wisconsin runs from November 1 through April 15 of
each year. During this period, utilities are prohibited from disconnecting residential
electric service when the service provides the primary source of heat. Residential water
service may still be disconnected for past-due balances when applicable criteria are
met.
This concludes my report for October 2026. Please contact me at 324-7920 or
sbrooks@waupunutilities.org with any questions or concerns.
TO: Waupun Utilities Commissioners
FROM: Owen Vande Kolk, Electric Operations Superintendent
DATE: October 12th, 2026
SUBJECT: Electric Operations Report
Electric Department Update:
Call-Ins
On 9/21 @ approximately 3:15 a.m., an outage was reported through the OMS. The outage was
caused by a customer equipment failure at a manufacturing facility. WU isolated the issue and was
able to restore power through temporary measures around 1:10 p.m.
On 9/23 at approximately 6:20 p.m., a customer reported a broken limb on a wire near the 200 block
of Carrington St. A lineman was called in and was able to remove the limb without taking an outage
on any of the surrounding customers.
On 9/24 at approximately 4:50 a.m., an AMI reported outage was transmitted for a residence in the
400 block of S. Grove St. The lineman on call responded and found a loose connection in the
customers meter socket. The customer is working with an electrician to get the equipment replaced.
On the morning of 10/5, WU received a call from WFD about a gas main hit at the corner of Shaler
and Buwalda Dr. The gas main damage and leak was located directly below one of WU’s three-
phase distribution circuits along with ATC’s transmission line. Alliant Energy requested that both
circuits be de-energized to protect life and property. WU coordinated with ATC to switch out that
portion of the transmission line and did not need to de-energize the distribution circuit. The gas main
hit resulted in one outage on Buwalda Dr. as a precaution. WU remotely disconnected the customer's
service while Alliant Energy and WFD addressed the gas leak and, after the home was cleared,
remotely reconnected the service.
Industrial Customer
WU is in communication with an industrial customer about the retirement of electrical equipment that
has reached end of life that currently supplies power to two of the customer’s electrical services. The
equipment is currently located on the roof of one of their buildings. In the coming weeks, WU will
continue to work with the customer on a plan to upgrade the two services, which includes the removal
of the roof-mounted equipment. WU will also be sourcing new dual-voltage transformers making it
possible to convert the customer and the 4160v circuit they are currently on to 12470v.
Primary URD Cable Replacement
As part of our annual primary cable replacement plan, crews will be installing new conduit and primary
cable at three locations throughout the city:
• S. Harris Ave. to the Dodge County Housing Authority transformers
o Approximately 1,200’ of new conduit has been installed.
• N. West St. feed to residential URD transformer
o Approximately 450’ of new conduit has been installed.
• County Park Campground
o Approximately 800’ of new conduit has been installed.
Crews will work in the coming weeks to install new primary cable in the installed conduit at each
location.
N. and S. Harris Pole Replacement
• Five 45’ three-phase poles have been installed on North and South Harris
o The poles are part of a three-phase feeder out of the Main Sub that are aging.
o Two of the five poles will have new URD cable risers installed as part of the primary
URD cable replacement project mentioned above.
Development Planning
• City of Waupun Alley Project
o All new infrastructure has been installed.
▪ Old poles have been pulled
▪ All URD infrastructure has been installed
• Shaler Dr. Street Lighting Infrastructure
o Includes 21 new 30’ aluminum poles and concrete bases.
o Approximately 5,000’ of conduit and wire installation.
o A directional drilling contractor has installed all conduit from Claggett Ave. to Country
View Dr. along the existing portion of Shaler Dr.
• Site Planning and Utility Design for 60-Unit Housing Development
o Working with developer on electric easements, transformer and service locations, and
transformer sizing.
o Temp service and primary extension scheduled for the end of October.
WPPI Shared Services
• Shared Meter Tech Service
o WU and WPPI’s SMTS wrapped up three-phase meter testing for 2026 on 10/5 and
10/6. WU contracts with WPPI for this service for 56 hours a year.
o The hours include three-phase meter testing, oil testing, and infrared scanning of
critical electrical system equipment.
This concludes my report for the October 2026 WU Commission Meeting. Please contact me at
324-7920 or ovandekolk@waupunutilities.org with any questions or concerns.
TO: Waupun Utilities Commissioners
FROM: Darren Sytsma
DATE: October 12, 2026
SUBJECT: Monthly Operation Report
Water Treatment Facility:
• Call-In Report
No call-ins to report.
• Operations
Well #4 480V to 120V transformer – A loose 120V connection was causing random
intermittent power failures. The loose wire was found during routine standby generator
testing and the transfer back to Utility power, causing arcing during the transfer
process. The loose connection and all other connections were tightened and checked
for signs of wear.
Well #2 – The motor shows signs of wear and will be replaced rather than relied upon
for another 10 years. The pump end will also be replaced. The column pipe had some
holes and worn threads and will be replaced. The submersible cable shows signs of
wear and will also be replaced. The submersible transducer has not been working for
the last few years and will be replaced as well. Following video logging of the well, it
was noted that the upper casing should be brushed due to buildup and scale. Lead time
on motor is about three weeks.
Well #3 – The electric motor has been sent to the motor shop to be cleaned, inspected,
and repaired as needed. Some of the column pipes show pitting and excessive wear on
the threads and will need replacement. The pump cases are very soft and the pump
ends need to be replaced. The head shaft was worn and a coupling connecting the
pump was damaged. Following video logging, the casing will need to be brushed due to
buildup.
SCADA Radio System Upgrade including an upgraded FCC license – Treatment
Facilities staff, along with a lineman and bucket truck, assisted the contractor with
installing new antennas and cables at the Water Plant, three lift stations, two water
towers, and four well locations. Treatment Facilities staff then assisted with installation
of the new 450 MHz UHF radio at the Water Plant, along with receivers and associated
accessories at each remote site. Following installation of all equipment, PLC
programming modifications were completed at each remote site and the Master SCADA
PLC located at the Water Plant. A switch-over strategy was developed to minimize
facility downtime. Old telemetry equipment was removed and decommissioned during
the post-switch-over phase of the project. This project will provide a complete radio
communications system with reliable service for the next 15-20 years.
Wastewater Treatment Facility:
• Call-In Report
No call-ins to report.
• Operations
Staff met with the Economic Workplace Development Business Development
Coordinator and the Dean of Manufacturing, Trades, and Apprenticeships from Moraine
Park Technical College to discuss resources available through the Workplace
Development “Boot Camps” and Core Program courses that could be tailored to the
future training of existing employees in preparation for future retirements and the loss of
in-house knowledge.
Mondovi update – Still awaiting a response from USDA regarding possible procurement
of select ABNR supplies and equipment.
Later this week, two Treatment Facilities staff will be attending the WWOA conference
in Green Bay. On Wednesday morning, between the Welcome Address and the
Keynote Speaker, our Youth Apprentice will be recognized in front of the organization
for his experiences and learning opportunities through the WWOA Apprenticeship
Program. The WWOA conference provides an opportunity for staff to attend workshops
and training sessions, network with fellow professionals and vendors, foster
collaboration and exchange ideas, explore new products, services, and technologies in
the exhibit hall, and earn continuing education credits.
Centrifuge #2 has recently experienced some leaking issues from the bowl assembly.
The machine will be disassembled and inspected, and a simple cleaning or repair may
be required. We recently received a tariff reimbursement from Flottweg and will apply it
toward additional spare parts prior to disassembly and inspection of the equipment.
Routine preventive maintenance is getting back on track with the additional staff.
Seasoned employees are training new staff on how to perform routine checks and carry
out required maintenance per our Wastewater Treatment Facilities maintenance
program document. All tank maintenance draining and inspections have been
completed for the year.
This concludes my report. Please do not hesitate to contact me with your questions or
concerns at 324-7920 or dsytsma@waupunutilities.org.
TO: Waupun Utilities Commissioners
FROM: Matt Geschke
DATE: October 12, 2026
SUBJECT: Monthly Operation Report
Collection and Distribution Crew
Call-In Report
• No call-ins to report
Water Distribution Operations
• Valve exercising has concluded with very minimal issues found
• Lead/Copper Update
At the beginning of 2026, we had 497 service lines classified as “unknown,” meaning the material type
had not yet been identified. Staff began contacting customers by email and phone, resulting in 189
customers reporting their service line material.
We then sent 308 door hangers to the remaining customers, which resulted in an additional 101
customers reporting their service line material. As a result, we have reduced the number of unidentified
service lines from 497 to 207.
Overall, we are making good progress toward completing the identification of the remaining service lines
and will continue our outreach efforts to obtain the remaining information.
Sanitary Sewer Operations
• Staff continues to perform sanitary sewer main flushing throughout the city with approximately 75% of the
work completed
• Staff will be making final adjustments to manholes and valve boxes on the Shaler Drive Project
This concludes my report. Please do not hesitate to contact me with your questions or concerns at 324-7920 or
mgeschke@waupunutilities.org.
TO: Waupun Utilities Commissioners
FROM: Chelsea Lisowe, Energy Services Manager
DATE: October 12, 2026
SUBJECT: Energy Services Manager Report
• Public Power Week, October 4-10th
o Coloring posters
▪ 3rd grade classes at CWC and RRI received coloring supplies and
coloring posters to work on for the month of October
• Voting on Facebook in early November
• Winning class at each school will receive pizza party
▪ Library received poster and supplies to use as a display/activity
o PPW Raffle
▪ Flyer/entry form went out as bill insert
▪ Customers can also enter using form on our NEW website (went live on
9/28- check it out!)
▪ Entries due by 10/31; winners announced first week of November
▪ All prizes sourced from Martens Ace Hardware
• Other October events
o Senior Expo at Community Center, 10/1
▪ Offered info on MyAccount and enrolling in text notifications
▪ Raffled off two annual passes to the WCC to WU customers
o Energy Assistance application event at Community Center, 10/16
▪ Customers can apply in person for WI Home Energy Assistance Program
(assists eligible households with heating & electric bills)
o Fall Business Lamp Recycling, 10/22
▪ Letters and pricing sheets mailed to commercial and industrial customers
▪ Customers receive WPPI’s negotiated rates with Logistic Recycling Inc
(LRI) for disposal
• 2026 Wisconsin Energy Efficiency Expo, 10/22, Monona Terrace
o Complimentary registrations offered to Waupun Utilities’ key account contacts
• Next round of WPPI Energized Ed Grants sent to schools
o Up to $10K available to support a proposed energy education initiative
o Applications due November 30th