A G E N D A
WAUPUN UTILITIES COMMISSION MEETING
817 S. Madison Street
Monday, September 14, 2026 at 4:00 PM
There is a regular commission meeting scheduled for Monday, September 14, 2026 at 4:00 p.m. at
the Waupun Utilities Administrative Building, with option to join via virtual and teleconference.
Instructions to join the meeting are provided below:
JOIN ZOOM MEETING
https://us02web.zoom.us/j/89819520743?pwd=amNEeGRJTzBNaVdhUHhpcUdDNGNwdz09
By Phone: 1 312 626 6799
Meeting ID: 898 1952 0743
Passcode: 061341
CALL TO ORDER
ROLL CALL OF COMMISSIONERS
PERSONS WISHING TO ADDRESS COMMISSION – State name, address, and subject of comments (2 Minutes)
CONSIDERATION - ACTION
1. Approval of Minutes from August 10, 2026
2. Approval of August 2026 Accounts Payable
3. Finance Director Report and Approval of Monthly Financial Results
4. Discussion / Approval of PGS1 Tariff Group Filing with PSCW
DISCUSSION - REVIEW
5. Substation Transformer Update
DEPARTMENT REPORTS
6. General Manager Report
7. Electric Operations Report
8. Treatment Facilities Report
9. Water and Sewer Operations Report
10. Energy Services Manager Report
ADJOURNMENT
Upon reasonable notice, efforts will be made to accommodate disabled individuals through
appropriate aids and services. For additional information, contact the General Manager at 920-
324-7920.
Minutes of a Regular Meeting of the
Waupun Utilities Commission
Monday, August 10, 2026
Meeting called to order by President Heeringa at 4:00 p.m.
Present: Commissioners Daane (virtual), Heeringa, Homan (virtual), Mielke, Siebers, and
Thurmer, and Mayor Bishop
Absent with notice: Commissioner Kunz
Alderman Kaczmarski, Chelsea Lisowe of WPPI, and Jason Whitford (virtual) were present as
visitors.
Mike Peters, President & CEO of WPPI Energy, was present to provide an overview of WPPI’s
member-driven mission, including its member-owned and member-governed structure, member
benefits, customer benefits, and the proposed member contract extension, which would extend
the current contract term from 2055 to 2073.
In continuation of the discussion regarding the WPPI contract extension, General Manager
Brooks presented a resolution recommending that the Waupun Common Council approve
Amendment No. 3 to the Long Term Power Supply Contract for Participating Members. Motion
by Thurmer, seconded by Mielke, and unanimously carried on roll call vote, 4 aye, 0 nay, to
approve the resolution. Daane – aye, Mielke – aye, Siebers – aye, and Thurmer – aye.
Motion made by Thurmer, seconded by Siebers, and unanimously carried to approve the minutes
from the July 13, 2026 meeting.
Motion by Siebers, seconded by Thurmer, and unanimously carried to approve the bills for the
month of July 2026 as presented.
On motion by Siebers, seconded by Mielke, and unanimously carried, year-to-date financial
reports through June 2026 were approved as presented by Finance Director Stanek. Electric
operating income was $392,900. Water operating income was $260,800. Sewer operating income
was $41,700.
General Manager Brooks presented highlights from his monthly report, including the July 15
MISO emergency event and peak load response, current hiring efforts and an internal promotion,
an update regarding the Comtech substation transformer failure, cybersecurity threats, and an
upcoming conference.
Electric Operations Superintendent Vande Kolk reported on outages, the mutual aid response in
Menasha, upcoming developments and planning, and WPPI GIS and Meter Tech services being
utilized. Three crew members provided mutual aid assistance in Menasha from July 27–30, with
one crew member remaining through August 6.
Treatment Facilities Superintendent Sytsma reported on operations and maintenance activities at
the water and wastewater treatment facilities, including water tower inspections, a water main
Waupun Utilities Commission
August 10, 2026 Meeting Minutes
Page 2
break, an internal staff promotion, Youth Apprentice training, Building #15 roof replacement,
and preventative maintenance in the process building. Ben Smith has been promoted to
Water/Wastewater Facilities Operator – Lead.
General Manager Brooks provided a brief overview of the Water and Sewer Operations Report,
noting that work on the Alley Way project is progressing well and commending staff for their
efforts and coordination with contractors.
Motion by Thurmer, seconded by Mielke, and unanimously carried to adjourn the meeting at
5:32 p.m.
The next regular commission meeting will be held on September 14, 2026, at 4:00 p.m.
Jen Benson
Office & Customer Service Supervisor
WAUPUN UTILITIES Paid Invoic e Report - COMMISSION Page: 1
Check issue dates: 8/1/2026 - 8/31/2026 Sep 08 , 2026 01:05PM
Vendor Invoice Invoice Invoice Check Check Check
Number Number Description Date Amount Amount Number Issue Date
ACTIVE OUTFITTERS
700 8/19/2026 OFFICE CLOTHING A LLOCATION 08/19/ 2026 488.00 488.00 513 46 08/19/2026
Total ACTIVE OUTFITTERS: 488.00 488.00
AIRGAS USA INC
855 5526230077 ACETYLENE/OXYGEN/NIT ROGEN-E 08/11/2026 69.62 69.62 513 31 08/11/2026
5526230077 ACETYLENE/OXYGEN/NITROGEN-W 08/11/2026 69.62 69.62 51331 0 8/11/2026
5526230077 ACETYLENE/OXYGEN/NITROGEN-S 08/11/2026 69.61 69.61 51331 0 8/11/2026
Total AIRGAS USA INC: 208.85 208.85
ALLIANT ENERGY
900 183035.07312026 GAS UTILITY - WA TER PLANT 08/11/2026 219.74 219. 74 81120261 08/11/2026
3261389217.07312 WWTF- PROCESS BLD, GR EEN HOUSE AND PUMP BLD 08/1 1/2026 209.37 209. 37 81120261 08/11/2026
43700000.0731202 GAS UTIL BI LL @ N2721 FDL ST - ADMIN/DIGESTER BLD 08/11/2026 227.56 227.56 81120261 08/11/2026
590516.07312026 SPLIT DISTRIBUTION- MAIN BLD - 2% E 08/11/2026 1.2 0 1.20 81120261 08/11/2026
590516.07312026 SPLIT DISTRIBUTION- MAIN BLD - 2% S 08/11/2026 1.2 0 1.20 81120261 08/11/2026
590516.07312026 SPLIT DISTRIBUTION- MAIN BLD - 2% W 08/11/2026 1.2 0 1.20 81120261 08/11/2026
590516.07312026 SPLIT DISTRIBUTION- MAIN BLD - 27% E 08/11/2026 16 .20 16.20 81120261 08/11/2026
590516.07312026 SPLIT DISTRIBUTION- MAIN BLD - 27% S 08/11/2026 16 .20 16.20 81120261 08/11/2026
590516.07312026 SPLIT DISTRIBUTION- MAIN BLD - 27% W 08/11/2026 16 .19 16.19 81120261 08/11/2026
590516.07312026 SPLIT DISTRIBUTION- MAIN BLD - 4% S 08/11/2026 2.4 0 2.40 81120261 08/11/2026
590516.07312026 SPLIT DISTRIBUTION- MAIN BLD - 4% W 08/11/2026 2.4 0 2.40 81120261 08/11/2026
590516.07312026 SPLIT DISTRIBUTION- MAIN BLD - 5% E 08/11/2026 3.0 0 3.00 81120261 08/11/2026
80105.07312026 GAS UTILITY FOR WELLHOUSE #5 08/11/2026 14.70 14.70 8 1120261 08/11/2026
931084.07312026 GAS UTIL @ N2721 FDL ST - FILTER & DEWATERING BLD 08/11/2026 50.64 50.64 81120261 08/11/2026
Total ALLIANT ENERGY: 782.00 782.00
AMAZON CAPITAL SERVICES
1015 11YJ-QKKF-3RDV (3) RATCHET ST RAPS FOR UNITS 171 & 172 08/28/2 026 170.97 170.97 1182 08/28/2026
13FT-TNJF-1HP9 WWTF - AIR FRESHNER'S 08/ 28/2026 20.49 20.49 1182 08/2 8/2026
13FT-TNJF-1HP9 MAIN BLD OFFICE SUPPLES 08/28/2026 16.32 16.32 1182 08 /28/2026
13FT-TNJF-1HP9 MAIN BLD OFFICE SUPPLES 08/28/2026 12.25 12.25 1182 08 /28/2026
13FT-TNJF-1HP9 MAIN BLD OFFICE SUPPLES 08/28/2026 12.24 12.24 1182 08 /28/2026
13FT-TNJF-1HP9 IPAD CASE FOR LINEMAN APPRENTICE 08/28/2026 23.99 23 .99 1182 08/28/2026
14LF-VQV4-PR16 SAFETY GLASSES ELECTRIC 08/11/2026 211.71 211.71 1162 08/11/2026
191J-GGFY-GNNX WWTP SLUDGE STORAGE LEVEL TRANSMITTER 08/11/2026 32 .51 32.51 1162 08/11/2026
1LYP-TYQX-YRY9 MAIN BLD SANITARY SUPPLIES 08/28/2026 15.58 15.58 118 2 08/28/2026
1LYP-TYQX-YRY9 MAIN BLD SANITARY SUPPLIES 08/28/2026 16.11 16.11 118 2 08/28/2026
1LYP-TYQX-YRY9 MAIN BLD SANITARY SUPPLIES 08/28/2026 20.27 20.27 118 2 08/28/2026
1MYW-N7WD-RFP WWTP ROLLER BR ACKETS 08/11/2026 134. 95 134.95 1162 08/1 1/2026
Total AMAZON CAPITAL SERVICES: 687.39 687.39
AT&T MOBILITY
1560 287362417474X072 CELLPHONE MONTHLY EXPENSES-E 08/11/2026 124.7 4 124.74 81120262 08/11/2026
287362417474X072 CELLPHONE MONTHLY E XPENSES-W 08/11/2026 77.84 77.8 4 81120262 08/11/2026
287362417474X072 CELLPHONE MONTHLY E XPENSES-S 08/11/2026 77.36 77.3 6 81120262 08/11/2026
Total AT&T MOBILITY: 279.94 279.94
BATTERIES PLUS LLC
2480 P93782742 OFFICE BATTERIES ( AA & AAA) 08/11/2026 14.69 14.69 116 3 08/11/2026
P93782742 OFFICE BATTERIES (AA & AAA) 08/11/ 2026 15.18 15.18 1163 08/ 11/2026
P93782742 OFFICE BATTERIES (AA & AAA) 08/11/ 2026 19.09 19.09 1163 08/ 11/2026
WAUPUN UTILITIES Paid Invoic e Report - COMMISSION Page: 2
Check issue dates: 8/1/2026 - 8/31/2026 Sep 08 , 2026 01:05PM
Vendor Invoice Invoice Invoice Check Check Check
Number Number Description Date Amount Amount Number Issue Date
Total BATTERIES PLUS LLC: 48.96 48.96
BORDER STATES ELECTRIC SUPPLY
3300 932916569 FUSE LINK BOXES (159) ) 08/11/2026 412.70 412.70 1164 08 /11/2026
Total BORDER STATES ELECTRIC SUPPLY: 412.70 412.70
BROOKS SHOES & REPAIR
3550 58657 SAFETY BOOTS FOR DAVID SCHLICHTING 08/28/2026 175.00 175. 00 1183 08/28/2026
Total BROOKS SHOES & REPAIR: 175.00 175.00
BYTEC RESOURCE MANAGEMENT
3900 0024434-IN ALGAE DISPOSAL ON 7/16/26 08/11/2026 150.00 150.00 51 332 08/11/2026
Total BYTEC RESOURCE MANAGEMENT: 150.00 150.00
CAREW CONCRETE & SUPPLY CO
5600 1344817 AG- 3/4" CRUSHER 08/11/2026 254.27 254.27 1165 08/11/2026
1344817 AG- 3/4" CRUSHER 08/11/2026 254.27 254.27 1165 08/11/2026
1344817 AG- 3/4" CRUSHER 08/11/2026 254.26 254.26 1165 08/11/2026
1345026 AG- 3/4" CRUSHER (QTY 53T) 08/28/2026 425.04 425.04 1184 08/2 8/2026
Total CAREW CONCRETE & SUPPLY CO: 1,187.84 1,187.84
CENTRAL CABLE CONTRACTORS INC
5750 11057 BORE (1) 2' HDPE CONDUIT (200 FT)- 602 HOARD RD 08/28/2 026 3,400.00 3,400. 00 51348 08/28/2026
Total CENTRAL CABLE CONTRACTORS INC: 3,400.00 3,400.00
COLUMN SOFTWARE PBC
6115 A1CF33FA-0026 RFP BID AD FOR COMMERCIAL BLD BASE 08/28/2026 10 7.27 107.27 1186 08/28/2026
A1CF33FA-0027 MNTHLY MEETING MINS-E 08/28/2026 44. 43 44.43 1186 08/28 /2026
A1CF33FA-0027 MNTHLY MEETING MINS-W 08/28/2026 35. 31 35.31 1186 08/28 /2026
A1CF33FA-0027 MNTHLY MEETING MINS-S 08/28/2026 34. 17 34.17 1186 08/28 /2026
A1CF33FA-0028 BID AD FOR VOLTAGE REGULATOR - NEW SUB 08/28/2026 10 2.05 102.05 1186 08/28/2026
A1CF33FA-0029 BID AD FOR 15KV BREAKERS - MAIN SUB 08/28/2026 100.3 0 100.30 1186 08/28/2026
Total COLUMN SOFTWARE PBC: 423.53 423.53
CORE & MAIN LP
6310 Z466315 1" IPEARL WATER METE R (1) 08/11/2026 270.00 270.00 1166 0 8/11/2026
Z466315 METER SHIPPING 08/ 11/2026 28.14 28.14 1166 08/11/2026
Total CORE & MAIN LP: 298.14 298.14
CT LABORATORIES
6610 207243 NITROGEN, NITROGEN KJE T, NO2+NO3 TESTING TOTAL 08/28/ 2026 56.00 56.00 1187 08/28/2026
Total CT LABORATORIES: 56.00 56.00
DEVRIES WELDING LLC
7100 03144 CLARIFIER COVERS (4) 08/11/2026 608.80 608. 80 51333 08/11/2 026
Total DEVRIES WELDING LLC: 608.80 608.80
WAUPUN UTILITIES Paid Invoic e Report - COMMISSION Page: 3
Check issue dates: 8/1/2026 - 8/31/2026 Sep 08 , 2026 01:05PM
Vendor Invoice Invoice Invoice Check Check Check
Number Number Description Date Amount Amount Number Issue Date
DIGGERS HOTLINE INC.
7300 260731801 MONTHLY LOCATE TICKET CHRGS 08/11/2026 296.40 296.40 5 1334 08/11/2026
Total DIGGERS HOTLINE INC.: 296.40 296.40
ENVISION GREATER FOND DU LAC
8520 WBA GOLF SPONS 2026 WAUPUN BUISN ESS ALLIANCE GOLF SPONSORSHI 08/11/2026 250.00 250. 00 51335 08/11/2026
Total ENVISION GREATER FOND DU LAC: 250.00 250.00
FABICK RENTAL
9155 SIMS0114754 #5 COMPACTO R VIB PLATE REPAIR 08/11/2026 1,813.69 1 ,813.69 51336 08/11/2026
SIMS0114754 #5 COMPACTOR VIB PLATE REPAIR 08/11/2026 1,813.70 1,813 .70 51336 08/11/2026
SIMS0114756 #5 COMPACTOR VIB PLATE REPAIR 08/11/2026 1,011.65 1,011 .65 51336 08/11/2026
SIMS0114756 #5 COMPACTOR VIB PLATE REPAIR 08/11/2026 1,011.65 1,011 .65 51336 08/11/2026
Total FABICK RENTAL: 5,650.69 5,650.69
MARTENS ACE HARDWARE
9200 252516 UNIT 172 ELECTRIC TOOLS - LADDER 08/11/ 2026 349.99 349.9 9 1173 08/11/2026
252601 PIPE REPAIR MATERIALS - WTF 08/11/ 2026 63.57 63.57 1173 08/11/ 2026
252653 WATER PLANT TUBING FOR LAB SINK 08/28/2026 15.98 15.98 1196 08 /28/2026
252720 PVC FOR WWTP PROCESS BLDING STRAINER DRAIN 08/28/2026 38.96 38.96 1196 08/28/2026
252795 BATTERY & BUSHINGS FOR WWT P PROCESS BLDING ST 08/28/2026 8. 98 8.98 1196 08/28/2026
252844 CONNECTORS, COUPLINGS, PVC 08/28/2026 51.93 51.93 1196 08/28/2 026
52604 JOINT COMPOUND - COPPER PIPE REPAIR - WTF 08/11/2026 8.99 8.9 9 1173 08/11/2026
Total MARTENS ACE HARDWARE: 538.40 538.40
FORSTER ELECTRICAL ENGINEERING
9885 27802 NEW SUBSTATION - ENGI NEERING 08/11/ 2026 51,123.75 51,123. 75 1167 08/11/2026
27827 TEMP TRANSFORMER EVAL - COMTECH SUB FAULT 08/11/2026 14,749. 25 14,749.25 1167 08/11/2026
27873 COMTECH SUB XFMR REPLACEMENT ANALYSIS 08/11/ 2026 7,631.25 7,6 31.25 1167 08/11/2026
27916 NEW BUSINESS PARK SUB - ENGINEERING 08/11/2026 12,146.00 12,1 46.00 1167 08/11/2026
Total FORSTER ELECTRICAL ENGINEERING: 85,650.25 85,650.25
FOX COMPUTER & NETWORKING INC
9920 340319 UPS SHIPPING - ALGAE SAM PLE FOR TESTING 08/28/2026 23.6 3 23.63 1188 08/28/2026
340320 SHIP REMOTE FOR DIGGER TRUCK UNIT 150 08/28/2026 115.30 115. 30 1188 08/28/2026
Total FOX COMPUTER & NETWORKING INC: 138.93 138.93
GFL ENVIRONMENTAL
11300 U90000335519 DUMPSTER - OFFICE B LDG-E 40% 08/28/2026 346.90 34 6.90 1189 08/28/2026
U90000335519 DUMPSTER - OFFICE BLDG-S 30% 08/28/2026 260.17 260.17 1 189 08/28/2026
U90000335519 DUMPSTER - OFFICE BLDG-W 30% 08/28/2026 260.17 260.17 1 189 08/28/2026
U90000335757 DUMPSTER - WWTP 08/28/ 2026 4,205.69 4,205.69 1189 08/28/ 2026
Total GFL ENVIRONMENTAL: 5,072.93 5,072.93
GORDON FLESCH COMPANY INC
11325 IN15719854 MTHLY CLICK COUNTS -E (39%) 08/28/2026 18.92 18.92 1 190 08/28/2026
IN15719854 MTHLY CLICK COUNTS -S (30%) 08/28/2026 14.56 14.56 1190 08 /28/2026
IN15719854 MTHLY CLICK COUNTS -W (31%) 08/28/2026 15.04 15.04 1190 08 /28/2026
WAUPUN UTILITIES Paid Invoic e Report - COMMISSION Page: 4
Check issue dates: 8/1/2026 - 8/31/2026 Sep 08 , 2026 01:05PM
Vendor Invoice Invoice Invoice Check Check Check
Number Number Description Date Amount Amount Number Issue Date
Total GORDON FLESCH COMPANY INC: 48.52 48.52
GRAINGER
11400 9024521917 WWTP PVC & VALVES 08/ 11/2026 389.53 389.53 1168 08/11 /2026
9027212001 REPAIR CHEMICAL FEED CO PPER LINES - WATER PLAN 08/11/2 026 63.82 63.82 1168 08/11/2026
9045065225 2" X 1 1/2" GALVANIZE BUSHING (24) 08/28/2026 271.20 271 .20 1191 08/28/2026
Total GRAINGER: 724.55 724.55
GUENTHER SUPPLY INC
11700 INV-550421 ABNR - PARTS FOR DISCHARGE CONE FOR CENTRIFUG 08/ 28/2026 82.44 82.44 1192 08/28/2026
INV-550521 ABNR-ITEMS FOR DISCHARGE CONE FOR CENTRIFUGE 08/28/20 26 124.09 124.09 1192 08/28/2026
Total GUENTHER SUPPLY INC: 206.53 206.53
HYDROCORP LLC
13985 CI-14525 CROSS CNNCTN CONTROL PROG & INSP/REP SERV 08/11/202 6 1,304.00 1,304. 00 1169 08/11/2026
CI-14528 CROSS CNNCTN CONTROL PROG & INSP/REP SERV 08/11/2026 950. 00 950.00 1169 08/11/2026
CI-15127 CROSS CNNCTN CONTROL PROG & INSP (NON-RES) 08/28/2026 1,3 04.00 1,304.00 1193 08/28/2026
CI-15130 CROSS CNNCTN CONTROL PROG & INSP (RESIDENTIAL) 08/28/202 6 950.00 950.00 1193 08/28/2026
Total HYDROCORP LLC: 4,508.00 4,508.00
ICS MEDICAL ANSWERING SERVICE LLC
14120 251800101101 ANSWERING SERVICE - E 08/11/2026 149.53 149.53 117 0 08/11/2026
251800101101 ANSWERING SERVICE - W 08/11/2026 118.85 118.85 1170 08/1 1/2026
251800101101 ANSWERING SERVICE - S 08/11/2026 115.02 115.02 1170 08/1 1/2026
252100101101 ANSWERING SERVICE - E 08/11/2026 118.41 118.41 1170 08/1 1/2026
252100101101 ANSWERING SERVICE - W 08/11/2026 94.12 94.12 1170 08/11/ 2026
252100101101 ANSWERING SERVICE - S 08/11/2026 91.09 91.09 1170 08/11/ 2026
Total ICS MEDICAL ANSWERING SERVICE LLC: 687.02 687.02
INFOSEND INC
14490 315829 BILL PRINT & POSTAGE-E (39%) 08/11/2026 5.87 5.87 1171 08 /11/2026
315829 BILL PRINT & POSTAGE-S (30%) 08/11/2026 4.51 4.51 1171 08/11/2 026
315829 BILL PRINT & POSTAGE-W (31%) 08/11/2026 4.66 4.66 1171 08/11/2 026
Total INFOSEND INC: 15.04 15.04
STUART IRBY CO LLC
14890 S014613445.002 URD TERMINATORS - 4/0 - 500 (3) 08/11/2026 705 .00 705.00 1178 08/11/2026
S014676493.001 1/0 STR ALUM URD PRIMARY (2760) 08/11/2026 13,496.4 0 13,496.40 1178 08/11/2026
Total STUART IRBY CO LLC: 14,201.40 14,201.40
ITU ABSORB TECH INC.
14950 8777576 SHOP TOWELS MTHLY RENT AL FEE-E 08/28/2026 14.48 14.48 1 194 08/28/2026
8777576 SHOP TOWELS MTHLY RENTAL FEE-S 08/28/2026 14.47 14.47 1194 08 /28/2026
8777576 SHOP TOWELS MTHLY RENTAL FEE-W 08/28/2026 14.48 14.48 1194 08 /28/2026
8777577 SHOP TOWELS FOR WWTP 08/28/2026 25.61 25. 61 1194 08/28/2026
Total ITU ABSORB TECH INC.: 69.04 69.04
J & H CONTROLS INC
16000 10000028396 BUILDING PREVENTATIVE MAINT.- WWTP REFRIGERANT 0 8/11/2026 26.02 26. 02 1172 08/11/2026
WAUPUN UTILITIES Paid Invoic e Report - COMMISSION Page: 5
Check issue dates: 8/1/2026 - 8/31/2026 Sep 08 , 2026 01:05PM
Vendor Invoice Invoice Invoice Check Check Check
Number Number Description Date Amount Amount Number Issue Date
10000028451 BUILDING PREVENTATIVE MAINT. - E 08/28/2026 209.20 209. 20 1195 08/28/2026
10000028451 BUILDING PREVENTATIVE MAINT. - S 08/28/2026 156.90 156. 90 1195 08/28/2026
10000028451 BUILDING PREVENTATIVE MAINT. - W 08/28/2026 156.90 156. 90 1195 08/28/2026
10000028452 BUILDING MAINT MTHLY CHRG-WTP 08/28/2026 199.00 199.00 1 195 08/28/2026
Total J & H CONTROLS INC: 748.02 748.02
KNOWLES PRODUCE & TRADING CO
17650 CT47695 #19 LAWNMOWER PARTS 08/28/2026 33.64 33. 64 51349 08/28/2 026
CT47695 #19 LAWNMOWER PARTS 08/ 28/2026 33.64 33.64 51349 08/28/2026
CT47695 #19 LAWNMOWER PARTS 08/ 28/2026 33.64 33.64 51349 08/28/2026
Total KNOWLES PRODUCE & TRADING CO: 100.92 100.92
MARTELLE WATER TREATMENT INC.
20250 32100 CASTIC SODA 50% BULK - W TF (WATER PH ADJUSTMEN 08/11/2 026 3,247.48 3,247. 48 51337 08/11/2026
Total MARTELLE WATER TREATMENT INC.: 3 ,247.48 3,247.48
NAPA AUTO PARTS
30900 472435 UNIT 23 OIL FILTER 08/11/2026 28. 14 28.14 1174 08/11/2026
472435 UNIT 23 OIL FILTER 08/11/2026 28. 13 28.13 1174 08/11/2026
472435 UNIT 23 OIL FILTER 08/11/2026 28. 13 28.13 1174 08/11/2026
472455 UNIT 23 MINITURE LIGHTBULBS 08/ 11/2026 9.81 9.81 1174 08/11/20 26
472455 UNIT 23 MINITURE LIGHTBULBS 08/ 11/2026 9.81 9.81 1174 08/11/20 26
472455 UNIT 23 MINITURE LIGHTBULBS 08/ 11/2026 9.81 9.81 1174 08/11/20 26
472983 SHOP TOWELS 08/28/ 2026 116.60 116.60 1197 08/28/2026
472983 SHOP TOWELS 08/28/ 2026 116.60 116.60 1197 08/28/2026
472983 SHOP TOWELS 08/28/ 2026 116.60 116.60 1197 08/28/2026
473696 UNIT 146 OIL 08/28/2026 8.13 8. 13 1197 08/28/2026
473696 UNIT 146 OIL 08/28/2026 8.13 8. 13 1197 08/28/2026
Total NAPA AUTO PARTS: 479.89 479.89
NORTH SHORE ANALYTICAL INC.
38500 15517 EFFLUENT & INFLUENT T ESTING - WWTF 08/28/2026 270.00 270 .00 1198 08/28/2026
Total NORTH SHORE ANALYTICAL INC.: 270.00 270.00
ODP BUSINESS SOLUTIONS LLC
38877 475409877.001 MAIN BUILDING OFFI CE SUPPLIES - E 08/28/2026 75 .51 75.51 1199 08/28/2026
475409877.001 MAIN BUILDING OFFICE SUPPLIES - W 08/28/2026 60.02 60 .02 1199 08/28/2026
475409877.001 MAIN BUILDING OFFICE SUPPLIES-S 08/28/2026 58.09 58.0 9 1199 08/28/2026
Total ODP BUSINESS SOLUTIONS LLC: 193.62 193.62
ONLINE INFORMATION SERVICES
38940 1405896 ONLINE UTILITY EXCHA NGE-E 08/11/2026 13.30 13.30 811202 63 08/11/2026
1405896 ONLINE UTILITY EXCHANGE-W 08/11/2026 10.58 10.58 81120263 08/ 11/2026
1405896 ONLINE UTILITY EXCHANGE-S 08/11/2026 10.24 10.24 81120263 08/ 11/2026
Total ONLINE INFORMATION SERVICES: 34.12 34.12
ONSOLVE, LLC
38955 15374191 ONE CALL NOW CALL CREDI TS - 2,000 MSGS 08/28/2026 11 7.00 117.00 1200 08/28/2026
15374191 ONE CALL NOW CALL CREDITS - 2,000 MSGS 08/28/2026 93.00 93 .00 1200 08/28/2026
15374191 ONE CALL NOW CALL CREDITS - 2,000 MSGS 08/28/2026 90.00 90 .00 1200 08/28/2026
WAUPUN UTILITIES Paid Invoic e Report - COMMISSION Page: 6
Check issue dates: 8/1/2026 - 8/31/2026 Sep 08 , 2026 01:05PM
Vendor Invoice Invoice Invoice Check Check Check
Number Number Description Date Amount Amount Number Issue Date
Total ONSOLVE, LLC: 300.00 300.00
O'REILLY AUTO PARTS
38970 2391-242939 BATTERY UNIT 8 08/ 11/2026 32.94 32.94 1175 08/11/202 6
2391-242939 BATTERY UNIT 8 08/ 11/2026 32.94 32.94 1175 08/11/2026
2391-242939 BATTERY UNIT 8 08/ 11/2026 32.93 32.93 1175 08/11/2026
Total O'REILLY AUTO PARTS: 98.81 98.81
PAYMENT SERVICE NETWORK
40285 328181 RT17076-CREDIT CARD F EES-E 65% 08/11/ 2026 614.64 614.64 81120264 08/11/2026
328181 RT17076-CREDIT CARD FEES-S 17% 08/11/2026 160.75 160.75 81120 264 08/11/2026
328181 RT17076-CREDIT CARD FEES-W 18% 08/11/2026 170.21 170.21 81120 264 08/11/2026
328801 RT28446-CREDIT CARD FEES-E 38% 08/11/ 2026 2.09 2.09 81120264 0 8/11/2026
328801 RT28446-CREDIT CARD FEES-S 37% 08/11/ 2026 2.03 2.03 81120264 0 8/11/2026
328801 RT28446-CREDIT CARD FEES-W 25% 08/11/ 2026 1.38 1.38 81120264 0 8/11/2026
Total PAYMENT SERVICE NETWORK: 951.10 951.10
PIGGLY WIGGLY
41200 2027 COMMISSION MEET ING SUPPLIES 08/11/ 2026 4.67 4.67 51338 08/1 1/2026
2027 COMMISSION MEETING SUPPLIES 08/11/2026 3.72 3.72 51338 08/11/202 6
2027 COMMISSION MEETING SUPPLIES 08/11/2026 3.60 3.60 51338 08/11/202 6
Total PIGGLY WIGGLY: 11.99 11.99
POWER SYSTEM ENGINEERING INC
42800 9065147 EDIT '26 ELEC SERV MA NUAL, PE REVIEW 08/28/2026 3,000 .00 3,000.00 1201 08/28/2026
Total POWER SYSTEM ENGINEERING INC: 3, 000.00 3,000.00
PRIMUS MARKETING GROUP INC
43375 PM26050 ELECTRIC M ETERS - 12S (96) 08/ 19/2026 19,728.00 19,728 .00 51347 08/19/2026
PM26050 TARIFF SURCHARGE ON 96 EL METERS 08/19/2026 592.32 592.32 51 347 08/19/2026
Total PRIMUS MARKETING GROUP INC: 20,320.32 20,320.32
PT TIRE & SERVICE CORP
43900 31700 POLE TRAILER TIRES 08/ 11/2026 1,113.00 1, 113.00 51339 08/1 1/2026
Total PT TIRE & SERVICE CORP: 1,113.00 1,113.00
RESCO
46400 3123660 FIBERGLASS CROSSAR M & HARDWARE (2) 08/11/2026 1,944.0 0 1,944.00 1176 08/11/2026
3123905 HOFFMAN SAFETY CLOTHES 08/11/2026 163.98 163. 98 1176 08/11/20 26
312550 TOOLS FOR TRUCKS 171 & 172 08/28/2026 1,240.81 1,240.81 1202 0 8/28/2026
3126243 (2) UNIVERSAL FOR SQUARE POLE TOOLS FOR UNITES 08/28/202 6 125.42 125.42 1202 08/28/2026
3126244 (2) POLE SAW ATTACHMENTS FOR UNITS 171 & 172 08/28/2026 93 .39 93.39 1202 08/28/2026
Total RESCO: 3,567.60 3,567.60
SEERA
51535 WAUPUN/JULY 202 "WAUPUN" FOCUS PROGRAM FEE 08/11/2026 2,912.4 7 2,912.47 1177 08/11/2026
Total SEERA: 2,912.47 2,912.47
WAUPUN UTILITIES Paid Invoic e Report - COMMISSION Page: 7
Check issue dates: 8/1/2026 - 8/31/2026 Sep 08 , 2026 01:05PM
Vendor Invoice Invoice Invoice Check Check Check
Number Number Description Date Amount Amount Number Issue Date
CHARTER COMMUNICATIONS
52500 171156801080726 WASTEWATER VOICE SERV 08/28/2026 94.60 94.60 11 85 08/28/2026
171156801080726 WATER PLANT VOICE SERV 08/28/2026 94.60 94.60 1185 08 /28/2026
171156801080726 MONTHLY SERVICE EXP-S 08/28/2026 82.68 82.68 1185 08/ 28/2026
171156801080726 MONTHLY SERVICE EXP-W 08/28/2026 85.44 85.44 1185 08/ 28/2026
171156801080726 MONTHLY SERVICE EXP -E 08/28/2026 107.49 107.49 1185 08/28/2026
171156801080726 INTERNET SERVICES-E 08/28/2026 112.44 112.44 1185 08/ 28/2026
171156801080726 INTERNET SERVICES-S 08/28/2026 86.49 86.49 1185 08/28 /2026
171156801080726 INTERNET SERVICES-W 08/28/2026 89.37 89.37 1185 08/28 /2026
Total CHARTER COMMUNICATIONS: 753.11 753.11
SPEE-DEE
52600 1518561 SERVICE CHRG FOR WATER SAMPLES 08/11/2026 56.52 56.52 5 1340 08/11/2026
1530463 SERVICE CHRG FOR WATER SAMPLES 08/28/2026 95.61 95.61 51350 0 8/28/2026
Total SPEE-DEE: 152.13 152.13
SUPERIOR CHEMICAL LLC
54200 446400 BREAK AWAY LUBRICANT 08/11/2026 105.17 105.17 1179 08/11/ 2026
Total SUPERIOR CHEMICAL LLC: 105.17 105.17
SWD LABS
54900 10149 COLIFORM BACTE RIA ANALYSIS @ PRISON TANK 08/28/2026 35. 00 35.00 51351 08/28/2026
Total SWD LABS: 35.00 35.00
TERMINATOR PEST CONTROL
55950 268551 PEST CONTROL MAI NT TO MAIN BLDG-E 08/28/2026 66.00 66.0 0 51352 08/28/2026
268551 PEST CONTROL MAINT TO MAIN BLDG-S 08/28/2026 49.50 49.50 5135 2 08/28/2026
268551 PEST CONTROL MAINT TO MAIN BLDG-W 08/28/2026 49.50 49.50 5135 2 08/28/2026
268899 PEST CONTROL AT WATER PLANT 08/28/2026 138.00 138.00 51352 08/ 28/2026
Total TERMINATOR PEST CONTROL: 303.00 303.00
TRUCLEANERS LLC
58700 JULY 2026 MONTHLY CLEANING SERVICE - E 08/11/2026 409.50 409.5 0 1180 08/11/2026
JULY 2026 MONTHLY CLEANING SERVICE - W 08/11/2026 325.50 325.50 1180 08/11/2026
JULY 2026 MONTHLY CLEANING SERVICE - S 08/11/2026 315.00 315.00 1180 08/11/2026
Total TRUCLEANERS LLC: 1,050.00 1,050.00
USA BLUE BOOK
59600 INV01133310 FREIGHT (MARKING PAINT) 08/28/ 2026 64.75 64.75 1203 08/28/2026
INV01133310 FREIGHT (MARKING PAINT) 08/28/2026 64. 75 64.75 1203 08/28 /2026
INV01133310 GREEN MARKING PAINT 08/28/2026 439.18 439. 18 1203 08/28/2 026
INV01133310 BLUE MARKING PAINT 08/28/2026 219.59 219. 59 1203 08/28/20 26
INV01133310 BLUE MARKING PAINT 08/28/2026 219.59 219. 59 1203 08/28/20 26
Total USA BLUE BOOK: 1,007.86 1,007.86
UTILITY SERVICE CO. INC.
59800 653344 ANNUAL MAINT PGRM - PEDISPHERE TOWER TANK #2 P 08/28/ 2026 22,659.21 22,659. 21 51354 08/28/2026
Total UTILITY SERVICE CO. INC.: 22,659.21 22,659.21
WAUPUN UTILITIES Paid Invoic e Report - COMMISSION Page: 8
Check issue dates: 8/1/2026 - 8/31/2026 Sep 08 , 2026 01:05PM
Vendor Invoice Invoice Invoice Check Check Check
Number Number Description Date Amount Amount Number Issue Date
US CARGO CONTROL
59980 797045 (4) WINCH STRAPS & (12) D-RING & TOP CAP FOR UNITS 0 8/28/2026 157.33 157. 33 51353 08/28/2026
Total US CARGO CONTROL: 157.33 157.33
VAN BUREN, JEROME and/or SANDRA
60800 JULY 2026 SOLAR SOLAR CRE DIT 7/26 08/11/ 2026 516.97 516.97 513 41 08/11/2026
Total VAN BUREN, JEROME and/or SANDRA: 516.97 516.97
WAUPUN, CITY OF
74400 1782 OPEB GASB 75 - USI CONSU LTING 08/11/2026 810.00 810.00 118 1 08/11/2026
1782 OPEB GASB 75 - USI CONSULTING 08/11/2026 837.00 837.00 1181 08/1 1/2026
1782 OPEB GASB 75 - USI CONSULTING 08/11/2026 1, 053.00 1,053.00 1181 08/11/2026
1783 EMPLOYEE CLINIC-E (38%) 08/11/2026 831.85 831. 85 1181 08/11/2026
1783 EMPLOYEE CLINIC-S (37%) 08/11/2026 809.97 809. 97 1181 08/11/2026
1783 EMPLOYEE CLINIC-W (25%) 08/11/2026 547.28 547. 28 1181 08/11/2026
1786 ALLEY PROJECT CONSTRUCTION PMT#1 08/11/2026 171,464.75 171,464 .75 1181 08/11/2026
1786 ALLEY PROJECT CONSTRUCTION PMT#1 08/11/2026 9,067.75 9,067.75 1 181 08/11/2026
1789_AUGUST 202 BASIC GROUP LIFE INS PREMIUM 08/28/2026 308.29 308.29 1204 08/28/202 6
1789_AUGUST 202 EMPLOYER CONTRIBUTION 20% - S 08/28/ 2026 13.12 13.12 1204 08/28/2026
1789_AUGUST 202 EMPLOYER CONTRIBUTION 20% - W 08/28/ 2026 13.56 13.56 1204 08/28/2026
1789_AUGUST 202 EMPLOYER CONTRIBUTION 20% - E 08/28/ 2026 17.06 17.06 1204 08/28/2026
PILOT AUGUST 20 2026 PILOT - WATER 08/11/2026 26, 433.00 26,433.00 1 181 08/11/2026
PILOT AUGUST 20 2026 PILOT - ELECTRIC 08/11/2026 21,471.00 21,471.0 0 1181 08/11/2026
STORMWATER JUL STORMWATER RECEIPTS 08/11/2026 51, 323.91 51,323.91 11 81 08/11/2026
TRASH JULY 2026 TRASH/RECYCLING COLLECTION 08/11/2026 50,235.63 50, 235.63 1181 08/11/2026
Total WAUPUN, CITY OF: 335,237.17 335,237.17
WEX BANK
79930 114226286 FUEL VEHICLE EXPENSE - E 08/11/2026 1, 829.91 1,829.9 1 81120265 08/11/2026
114226286 FUEL VEHICLE EXPENSE - W 08/11/2026 966.50 966.50 81120265 08/11/2026
114226286 FUEL VEHICLE EXPENSE - S 08/11/2026 1,712. 46 1,712.46 8112 0265 08/11/2026
Total WEX BANK: 4,508.87 4,508.87
WISCONSIN RURAL WATER ASSOC
88200 SCHLIGHTING - G SCHLIGHTING GROUNDWATER TRAINING 08/11/2026 1 25.00 125.00 51343 08/11/2026
SCHLIGHTING - H2 SCHLIGHTING DRINKING WATER TREATMENT & DIST 08/1 1/2026 125.00 125. 00 51343 08/11/2026
SCHLIGHTING O& SCHLIGHTING - MA TH & O&M REGULATIONS 08/11/2026 125 .00 125.00 51343 08/11/2026
Total WISCONSIN RURAL WATER ASSOC: 375.00 375.00
WISCONSIN STATE LAB OF HYGIENE
88300 30049069 FLUORIDE LAB TESTING - WTF 08/28/2026 33.00 33.00 5135 7 08/28/2026
Total WISCONSIN STATE LAB OF HYGIENE: 33.00 33.00
WPPI ENERGY
89600 27-72026 METER DATA COLLECTIO N - E 08/28/2026 1,030.48 1,030.4 8 8282026 08/28/2026
27-72026 METER DATA COLLECTION - W 08/28/2026 819.10 819.10 8282026 0 8/28/2026
27-72026 METER DATA COLLECTION - S 08/28/2026 792.67 792.67 8282026 0 8/28/2026
27-72026 HOSTED BILLING CIS-E 08/28/2026 792.70 792.70 8282026 08/28/ 2026
27-72026 HOSTED BILLING CIS-W 08/28/2026 630.10 630.10 8282026 08/28/ 2026
27-72026 HOSTED BILLING CIS-S 08/28/2026 609.76 609.76 8282026 08/28/ 2026
27-72026 GIS SUPPORT -E 08/28/ 2026 1,191.67 1,191. 67 8282026 08/28/20 26
WAUPUN UTILITIES Paid Invoic e Report - COMMISSION Page: 9
Check issue dates: 8/1/2026 - 8/31/2026 Sep 08 , 2026 01:05PM
Vendor Invoice Invoice Invoice Check Check Check
Number Number Description Date Amount Amount Number Issue Date
27-72026 SHARED METER TECH SERVICE-E 08/ 28/2026 214.38 214.38 828202 6 08/28/2026
27-72026 SHARED METER TECH SERVICE-W 08/ 28/2026 214.37 214.37 828202 6 08/28/2026
27-72026 CYBER SECURITY-E 08/28/2026 238.65 238.65 8282026 08/28/2026
27-72026 CYBER SECURITY-W 08/28/2026 195.26 195.26 8282026 08/28/2026
27-72026 CYBER SECURITY-S 08/28/2026 289.27 289.27 8282026 08/28/2026
27-72026 MEMEBER NETWORK ASSESMT & MONITOR-E 08/ 28/2026 40.63 40.63 8282026 08/28/2026
27-72026 MEMEBER NETWORK ASSESMT & MONITOR-W 08/ 28/2026 32.29 32.29 8282026 08/28/2026
27-72026 MEMEBER NETWORK ASSESMT & MONITOR-S 08/ 28/2026 31.25 31.25 8282026 08/28/2026
27-72026 IT TICKETS -E 08/28/ 2026 57.92 57.92 8282026 08/28/2026
27-72026 IT TICKETS -W 08/28/ 2026 46.04 46.04 8282026 08/28/2026
27-72026 IT TICKETS -S 08/28/ 2026 44.55 44.55 8282026 08/28/2026
27-72026 WPPI WAN-E 08/28/ 2026 64.35 64.35 8282026 08/28/2026
27-72026 WPPI WAN-W 08/28/ 2026 51.15 51.15 8282026 08/28/2026
27-72026 WPPI WAN-S 08/28/ 2026 49.50 49.50 8282026 08/28/2026
27-72026 T-MOBILE - E 08/28/ 2026 5.00 5.00 8282026 08/28/2026
27-72026 T-MOBILE - W 08/28/ 2026 5.00 5.00 8282026 08/28/2026
27-72026 USP OIL SAMPLE SHIPPIN CHARGE 08/28/2026 172.82 172.82 8282 026 08/28/2026
27-72026 WHOLE SALE POWER BILL 08/28/2026 1,121,772.37 1,121,772.37 8282026 08/28/2026
Total WPPI ENERGY: 1,129,391.28 1,129,391.28
WAUPUN UTILITIES (Refund Acct)
100000 15015046-020 OVE REF UND DOUBLE PAYMENT 08/11/2026 143.93 143.93 51342 08/11/2026
15033750.24 REF OVERPAYMT FRM: 207 GRANDVIEW AVE 08/28/2026 112.04 112.04 51356 08/28/2026
18065260.23 REF OVERPAYMT FRM: 4 1/2 S MADISON ST APT 3 08/28/202 6 28.73 28.73 51355 08/28/2026
Total WAUPUN UTILITIES (Refund Acct): 284.70 284.70
Grand Totals: 1,661,183.99 1,661,183.99
Page: 1ACH and TRANSFER PAYMENTSWAUPUN UTILITIES
Period 08/26 (08/31/2026) Sep 08, 2026 1:04PM
Date
Reference
Number Payee or Description
Account
Number Account Title
Debit
Amount
Credit
Amount
CASH DISBURSEMENTS (CD)
1
08/11/2026 1 Record WF Monthly F ees 1-5921-0000-20 OFFICE SUPPLIES AND EXPENS 26.13
Record WF Monthly Fees 2-5921-0000-20 OFFICE SUPPLIES & EXPENSES 7 .24
Record WF Monthly Fees 3-5851-0000-20 OFFICE SUPPLIES & EXPENSES 6 .83
Record WF Monthly Fees 9-1131-0000-00 COMBINED CASH .00 40.20-
40.20-40.20Total 1:
CASH DISBURSEMENTS (CD)
2
08/10/2026 2 Record ACH Credit Car d Paymt 1-2232-0000-00 ACCOUNTS P AYABLE - ELECTRI 2,066.68
Record ACH Credit Card Paymt 2-2232-0000-00 ACCOUNTS PAYABLE - WA TER 331.48
Record ACH Credit Card Paymt 3-2232-0000-00 ACCOUNTS PAYABLE - WASTEW 398.89
Record ACH Credit Card Paymt 9- 1131-0000-00 COMBINED CASH .00 2,797 .05-
2,797.05-2,797.05Total 2:
CASH DISBURSEMENTS (CD)
3
08/19/2026 3 Record July Sales & Use Tax 1-2241-2416-00 TAX COLL PA Y - SALES TAX 18,352.47
Record July Sales & Use Tax 9-1131-0000-00 COMBINED CASH .00 18,352 .47-
18,352.47-18,352.47Total 3:
CASH DISBURSEMENTS (CD)
4
08/31/2026 4 Bond Pmt - 2019 Rfdg. Revenue P&I - DTCC (via W 2-223 7-0000-00 INTEREST ACCRUED 22,593.75
Bond Pmt - 2019 Rfdg. Revenue P&I - DTCC (via W 9-1131-0000-00 CO MBINED CASH .00 22,593.75-
22,593.75-22,593.75Total 4:
43,783.47-43,783.47Total CASH DISBURSEMENTS (CD):
References: 4 Transactions: 12
43,783.47-43,783.47Grand Totals:
Page 1 of 3
TO: Waupun Utilities Commissioners
FROM: Jeff Stanek, CPA, Finance Director
DATE: September 14, 2026
SUBJECT: July 2026 Financial Report
CONSTRUCTION AND PLANT ADDITIONS
The electric utility construction activity consisted of continued work on the alleyway reconstruction project,
Mutual Aid for Menasha and miscellaneous customer work. Engineering work continues with the
Business Park substation and the Mill to Madison Street Alleyway reconstruction projects. The
Water/Sewer crews continued construction associated with the Alleyway reconstruction projects related to
installing temporary services for existing customers during the construction phase. There were no plant
additions for the month.
MONTHLY OPERATING RESULTS – July 2026 Monthly and Year-To-Date (YTD)
Sales
Electric
➢ Monthly kWh sales were 9.1% above budget & 9.6% higher than July 2025 on increased sales to
Large and Industrial Power customers.
➢ YTD kWh sales were 7.0% above budget & 10.3% higher than July 2025 YTD actual sales.
Water
➢ Monthly sales units of 100 cubic feet were 12.7% above budget & 11.3% higher than July 2025
sales on and increase in sales to all customer classes.
➢ YTD water sales were 2.3% above budget & 2.3% higher than July 2025 YTD actual sales.
Sewer
➢ Monthly sales units of 100 cubic feet were 5.3% above budget & 10.1% higher than July 2025
from higher volumes to Industrial & Public Authority customers.
➢ YTD sewer sales were 6.1% above budget & 5.2% higher than July 2025 YTD actual sales.
Income Statement
Electric
➢ Operating revenues and purchased power expense were above budget $496,100 and $470,800,
respectively, due to increased consumption and higher market energy costs.
➢ Gross margin was $25,300 above budget as a result of the higher unit sales than budgeted.
➢ Operating expenses were $99,300 below budget primarily due to lower distribution expenses
associated with tree trimming during the non-construction season, increased work order activity
and mutual aid to other communities.
➢ Operating income was $503,400 or $221,100 above budget, largely due to higher operating
revenue and lower expenses than originally budgeted.
➢ Net income was $613,000 or $326,900 above budget primarily from increased operating
revenues.
➢ The rolling 12-month Rate of Return was 9.0%.
Page 2 of 3
Water
➢ Operating revenues were above budget by $20,200 due to increases in revenues from
Commercial and Public Authority customers.
➢ Operating expenses were $25,800 above budget on higher distribution expenses associated with
water main breaks during winter freezing periods and meter costs from repaired meters.
➢ Operating income was $334,000 or $1,800 above budget.
➢ Net income was $373,200 or $64,300 above budget.
➢ The rolling 12-month Rate of Return was 3.9%.
Sewer
➢ Operating revenues were $84,000 above budget due to slight increases high strength charges to
Public Authority customers.
➢ Operating expenses were $88,400 below budget due to fewer maintenance costs experienced
during the month, primarily from lower drying costs from the ABNR process.
➢ Operating income (loss) was $44,900 or $151,200 above budget as a result of the increased
revenues and lower operating expenses.
➢ Net income (loss) was ($58,900) or $195,800 above budget largely due to lower operating
expenses.
➢ The rolling 12-month Rate of Return was 2.8%.
Balance Sheets
Electric
➢ Balance sheet increased $408,900 from June 2026 due to an increase in receivables / payables
associated with higher consumption & power-related costs typically experienced during the
summer (high consumption) months.
➢ Unrestricted cash increased $44,900 from routine operations.
➢ Net Position increased $131,500.
Water
➢ Balance sheet increased $82,900 from June 2026 due to an increase in cash from routine
operations.
➢ Unrestricted cash increased $82,300 from routine operations.
➢ Net Position increased $78,100.
Sewer
➢ Balance sheet increased $12,900 from June 2026 as a result of routine operations.
➢ Unrestricted cash increased $79,700 from routine operations.
➢ Net Position decreased $13,900 from routine operations and monthly depreciation expense being
higher than operating margins.
Cash and Investments
The monthly metrics dashboard for cash and investments provides a monthly comparison of cash and
investment balances and graphs that present long-term investments by maturity, type, and rating. The
Utility’s investments are typically fixed-income and held-to-maturity unless called before maturity by the
issuer. Held to maturity investments recognize monthly mark to market adjustments that ultimately are not
realized when the investment matures.
➢ Total cash and investments increased $327,100 or 2.4% from June 2026 primarily from routine
operating activity.
➢ Received interest and distributions of $23,200 and recorded unrealized market adjustments of
($15,900) along with ($800) in management fees, resulting in a net portfolio gain of $6,500 for the
month.
➢ Total interest and investment income earned (excluding market value adjustments) on all accounts for
the month was $43,200 and $273,600 year-to-date.
Page 3 of 3
OTHER FINANCIAL MATTERS
WWTP Upgrade – Construction Update and Progress
Listed below is a summary of the costs incurred and paid for with USDA loan proceeds requested to date:
Total Project Budget (As of 4/14/2022): $ 37,508,000
Total Project Costs to Date (Thru 3/4/2026): $ 37,362,326
Loan Draws – Project to Date (Thru 8/29/2022): $ 27,807,000
Grants Provided (Thru 4/8/2026): $ 9,555,326
Disburse Request #41 Requested (2/17/26): $ 41,439
Disburse Request #41 – Paid (3/3/2026): $ 42,433
Preliminary 2027 Budgets
The preliminary 2027 utility budgets will be presented at the October 2026 Commission meeting
This concludes my report. Please do not hesitate to contact me at 324-7920 or
jstanek@waupunutilities.org with any questions or comments.
Waupun Utilities
Construction and Plant Additions Summary
July 2026
CONSTRUCTION: Total
Description Month
Project
To Date Budget Month
Project
To Date Budget Month
Project
To Date Budget
Project
To Date Budget
Projects:
Overhead and underground conductor and devices 804 $ 84,942$ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ 84,942$ ‐ $
Transformers ‐ ‐ 75,000 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 75,000
Overhead and Underground Services 1,818 10,703 10,000 ‐ ‐ ‐ ‐ ‐ ‐ 10,703 10,000
LED street lighting 1,724 12,574 10,000 ‐ ‐ ‐ ‐ ‐ ‐ 12,574 10,000
Voltage conversion ‐ ‐ 60,000 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 60,000
Rebuild overhead and underground line 2,140 2,140 310,000 ‐ ‐ ‐ ‐ ‐ ‐ 2,140 310,000
Work Invoiced to Customer / Others ‐ CIAC ‐ 16,431 ‐ ‐ ‐ ‐ ‐ 232 ‐ 16,663 ‐
Mutual Aid reimbursements 14,639 34,480 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 34,480 ‐
Meters / Meter Modules / Gatekeepers ‐ ‐ 10,000 ‐ ‐ ‐ 1,696 9,703 8,000 9,703 18,000
Sewer CIPP & manhole lining ‐ ‐ ‐ ‐ ‐ 85,000 ‐ ‐ ‐ ‐ 85,000
New Water Well ‐ #6 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,682 52,000 1,682 52,000
Mill / Madison Street Alleyway Reconstruction 35,913 50,645 ‐ 1,024 3,932 93,936 7,165 34,749 357,564 89,326 451,500
N Grove, Park, Franklin Street Reconstruction ‐ ‐ ‐ ‐ 11,537 ‐ ‐ 11,553
Miscellaneous Work Orders 151 933 ‐ 3,783 6,457 11,675 ‐ 1,709 ‐ 9,099 11,675
TOTAL CONSTRUCTION 57,188$ 212,848$ 475,000$ 4,807$ 21,926$ 190,611$ 8,862$ 59,629$ 417,564$ 271,313$ 1,083,175$
CARRYOVER PROJECTS:
Business Park Substation 1,541 161,748 1,334,700 ‐ ‐ ‐ ‐ ‐ ‐ 161,748 1,334,700
Substation upgrades 23,210 164,646 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 164,646 ‐
OH & URD Re‐Build Projects ‐ 21,059 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 21,059 ‐
WWTF Phosphorus Upgrade Engineering ‐ ‐ ‐ ‐ 3,872,607 3,804,000 ‐ ‐ ‐ 3,872,607 3,804,000
WWTF Construction Upgrade ‐ ABNR ‐ ‐ ‐ ‐ 33,489,719 33,704,000 ‐ ‐ ‐ 33,489,719 33,704,000
TOTAL CARRYOVER CONSTRUCTION 24,751$ 347,453$ 1,334,700$ ‐$ 37,362,326$ 37,508,000$ ‐ $ ‐$ ‐$ 37,709,778$ 38,842,700$
PLANT ADDITIONS: Total
Description
Current
Month YTD Budget
Current
Month YTD Budget
Current
Month YTD Budget YTD Budget
Vehicle Replacements (2 utililty‐body & 1 pick‐up) ‐ $ 41,780$ 171,500 $ ‐ $ 11,415$ 10,750 $ ‐ $ 11,415$ 10,750 $ 64,609 $ 193,000 $
Admin Building Structures & Equipment ‐ 35,676 68,400 ‐ 29,900 51,300 $ ‐ 31,344 51,300 96,920 171,000
SCADA & Treatment Facility Upgrades ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 58,000 ‐ 58,000
Lift Station Upgrades ‐ ‐ ‐ ‐ ‐ 30,000 ‐ ‐ ‐ ‐ 30,000
WWTF Equipment Replacements ‐ ‐ ‐ ‐ 21,890 72,000 ‐ ‐ ‐ 21,890 72,000
WWTF Nonpotable SystemReplacements ‐ ‐ ‐ ‐ ‐ 160,000 ‐ ‐ ‐ ‐ 160,000
Other Equipment Upgrades & Replacements ‐ 9,464 60,600 ‐ ‐ 13,300 ‐ ‐ 33,300 9,464 107,200
TOTAL PLANT ADDITIONS ‐$ 86,919$ 300,500$ ‐$ 63,205$ 337,350$ ‐$ 42,759$ 153,350$ 192,883$ 791,200$
Electric Sewer Water
Sewer WaterElectric
Page 1 of 11
Variance from Budget Variance from Budget
Current Current YTD Current Current YTD
KWh 12,521,230 9.1% 7.0% Power Costs 1,121,772 $ 14.2% 8.6%
Revenues 1,379,730$ 15.6% 7.0% Gross Margin 257,957 $ 22.1% 1.6%
Variance from Budget Variance from Budget
Current Current YTD Current Current YTD
Cubic Ft (100) 23,122 12.7% 2.3% Revenues 168,803 $ 7.2% 1.3%
Variance from Budget Variance from Budget
Current Current YTD Current Current YTD
Cubic Ft (100) 40,347 5.3% 6.1% Revenues 326,727 $ 4.9% 4.5%
Sales and Revenues Dashboard ‐ July 2026
5,000,000
6,000,000
7,000,000
8,000,000
9,000,000
10,000,000
11,000,000
12,000,000
13,000,000
Jul‐25 Aug‐25 Sep‐25 Oct‐25 Nov‐25 Dec‐25 Jan‐26 Feb‐26 Mar‐26 Apr‐26 May ‐26 Jun‐26 Jul‐26
kWhs Sold Actual Budgeted
10,000
12,000
14,000
16,000
18,000
20,000
22,000
24,000
Jul‐25 Aug‐25 Sep‐25 Oct‐25 Nov‐25 Dec‐25 Jan‐26 Feb‐26 Mar‐26 Apr‐26 May ‐26 Jun‐26 Jul‐26
Water Cubic Feet (100's) Sold Actual Budgeted
20,000
25,000
30,000
35,000
40,000
45,000
Jul‐25 Aug‐25 Sep‐25 Oct‐25 Nov‐25 Dec‐25 Jan‐26 Feb‐26 Mar‐26 Apr‐26 May ‐26 Jun‐26 Jul‐26Sewer Cubic Feet (100's) Treated
Actual Budgeted
Sales by Customer Class July 2026
‐
2,000,000
4,000,000
6,000,000
8,000,000
10,000,000
12,000,000
14,000,000
16,000,000
18,000,000
20,000,000
22,000,000
Residential Commerical Small Power Large Power Industrial Power Larg e Industrial
YTD Electric Sales (kWh)
Budget 2025 2024 2023
‐
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
Residential Commercial Industrial Public Authority
YTD Sewer Sales (Ccf)
Budget 2025 2024 2023
‐
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
90,000
Residential Multifamily Commercial Industrial Public Authority
YTD Water Sales (Ccf)
Budget 2025 2024 2023
Page 3 of 11
ELECTRIC July 2024 July 2025 July 2026
Sales of Electricity 10,523,034 $ 11,215,733 $ 12,679,783 $
Purchased Power 8,289,041 8,669,502 9,979,603
Gross Margin 2,233,992 2,546,230 2,700,179
21.2% 22.7% 21.3%
Other Operating Revenues 140,855 128,106 140,700
Operating Expenses
Distribution expense 336,258 389,608 420,020
Customer accounts expense 133,445 139,835 139,910
Advertising expense (1,353) 5,093 584
Administrative & general expense 488,764 515,178 488,023
Total operating expenses 957,115 1,049,714 1,048,538
Other Operating Expenses
Depreciation expense 671,153 670,833 725,673
Taxes 318,236 299,412 380,209
Total other operating expenses 989,389 970,245 1,105,882
Operating Income 428,344 654,377 686,458
Other Income (Expense)
Capital contributions 880,708 59,052 454,272
Interest expense (15,019) (7,577) (3,798)
Amortization of debt-related costs (6,274) (6,053) (3,327)
Other 178,877 194,707 486,945
Total other income (expense) 1,038,292 240,129 934,092
Net Income 1,466,636 $ 894,507 $ 1,620,551$
Regulatory Operating Income 519,636 772,205 757,069
Rate of Return 6.33 9.30 9.04
Authorized Rate of Return 5.00 6.30 6.30
Current Ratio 5.8 5.4 5.3
Months of Unrestricted Cash on Hand 5.3 5.5 5.7
Equity vs Debt 0.97 0.99 1.00
Asset Utilization 0.58 0.59 0.60
Combined E&W Debt Coverage 4.31 4.42 7.96
Minimum Required Coverage 1.25 1.25 1.25
Note 1 - Electric rates adjusted April 2024.
Definitions
Rate of Return - Return on investment in capital infrastructure. Should be near authorized rate of return.
Current Ratio - measure of liquidity or ability to pay obligations. Should be > 1.
Months of Unrestricted Cash on Hand - measure of reserves. Should be at least 2-3 months.
Equity vs Debt - Percent of infrastucture financed by operations. 50% is a good benchmark.
Asset Utilization - Illustrates the relative age of the system. Ratio of 1 indicates a system at full life expectancy.
Debt Coverage - Earnings coverage of annual debt service. Must exceed 1.25
WAUPUN UTILITIES
Income Statement and Financial Ratios
Electric Utility
For the 12 Months Ending:
Page 4 of 11
Last 12 Months YTD 2026 YTD Budget Difference
ELECTRIC
Operating Revenues 12,679,783 $ 7,555,626 $ 7,059,549 $ 496,077 $
Purchased Power 9,979,603 5,935,341 5,464,571 470,770
Gross Margin 2,700,179 1,620,285 1,594,978 25,307
21.3% 21.4% 22.6%
Other Operating Revenues 140,700 157,641 64,092 93,549
Operating Expenses
Distribution expense 420,020 263,635 377,488 (113,853)
Customer accounts expense 139,910 80,150 77,574 2,576
Advertising expense 584 5,401 490 4,911
Administrative & general expense 488,023 324,911 317,854 7,057
Total operating expenses 1,048,538 674,096 773,406 (99,310) -12.84%
Other Operating Expenses
Depreciation expense 725,673 410,184 410,186 (2)
Taxes 380,209 190,205 193,102 (2,897)
Total other operating expenses 1,105,882 600,389 603,288 (2,899)
Operating Income 686,458 503,441 282,376 221,065
Other Income (Expense)
Capital contributions 454,272 - - -
Interest expense (3,798) (975) (1,708) 733
Amortization of debt-related costs (3,327) (847) (497) (350)
Other 486,945 111,299 5,831 105,468
Total other income (expense) 934,092 109,477 3,626 105,851
Net Income 1,620,551 $ 612,918 $ 286,002 $ 326,916 $
July 2026 June 2026 May 2026 April 2026 March 2026 Feb 2026 Jan 2026 D ec 2025 Nov 2025 Oct 2025 Sept 2025 Aug 2025 July 2025
Operating Revenues 1,379,730$ 1,164,611 $ 1,027,198 $ 921,776 $ 962,424 $ 1,091,652 $ 1,008,235 $ 936,399 $ 874,356 $ 943,931 $ 1,046,804 $ 1,322,666 $ 1,293,864 $
Purchased Power 1,121,772 927,632 806,569 696,551 737,978 869,528 775,311 703,826 671,351 727,762 839,779 1,101,544 1,064,883
Gross Margin 257,957 236,979 220,629 225,225 224,446 222,124 232,924 232,573 203,006 216,169 207,025 221,121 228,981
18.7% 20.3% 21.5% 24.4% 23.3% 20.3% 23.1% 24.8% 23.2% 22.9% 19.8% 16.7% 17.7%
Other Operating Revenues 19,843 9,993 11,568 9,919 9,910 9,436 86,972 (60,792) 9,729 10,895 10,927 12,300 10,134
Operating Expenses
Distribution expense 27,814 25,495 24,051 30,386 41,486 55,430 58,972 9,446 30,199 33,990 36,199 46,552 30,867
Customer accounts expense 12,440 11,567 10,607 11,720 10,839 10,404 12,573 18,222 9,680 10,123 10,185 11,551 8,993
Advertising expense 1,336 2,803 (3,866) 1,126 1,965 1,787 250 (3,263) (7,718) 3,123 954 2,088 5,431
Administrative & general expense 41,741 32,852 48,383 22,542 61,798 51,345 66,251 20,020 25,479 39,739 31,852 46,022 44,527
Total operating expenses 83,331 72,717 79,174 65,774 116,088 118,966 138,046 44,424 57,639 86,975 79,190 106,213 89,818
Other Operating Expenses
Depreciation expense 58,598 58,598 58,598 58,598 58,598 58,598 58,598 93,824 55,416 55,416 55,416 55,416 55,416
Taxes 25,373 24,921 25,067 30,646 26,777 27,219 30,200 72,183 23,993 43,186 24,031 26,612 24,282
Total other operating expenses 83,971 83,519 83,665 89,244 85,375 85,817 88,798 166,007 79,409 98,602 79,447 82,028 79,699
Operating Income 110,498 90,737 69,357 80,126 32,893 26,777 93,053 (38,651) 75,686 41,487 59,315 45,180 69,598
Other Income (Expense)
Capital contributions - - - - - - - 454,272 - - - - -
Interest expense - - - - (975) - - (565) (565) (565) (565) (565) (565)
Amortization of debt-related costs - - - - (706) (70) (70) (496) (496) (496) (496) (496) (496)
Other 21,033 25,943 14,524 9,936 5,598 19,721 14,545 315,019 16,894 9,780 14,931 19,023 10,011
Total other income (expense) 21,033 25,943 14,524 9,936 3,917 19,650 14,475 768,231 15,833 8,719 13,870 17,962 8,951
Net Income 131,531 $ 116,679 $ 83,881 $ 90,062 $ 36,810 $ 46,428 $ 107,527 $ 729,580 $ 91,519 $ 50,206 $ 73,185 $ 63,142 $ 78,549 $
WAUPUN UTILITIES
Detailed Income Statement and YTD Budget Comparison
Electric Utility
For the Period Ended July, 31 2026
Page 5 of 11
WATER July 2024 July 2025 July 2026
Operating Revenues 2,715,327 $ 2,679,116 $ 2,677,987 $
Operating Expenses
Source of supply expenses 4,162 2,496 4,706
Pumping expenses 81,157 94,717 105,145
Water treatment expenses 307,777 414,453 335,517
Transmission & distribution expenses 215,611 224,186 287,052
Customer accounts expenses 117,084 119,140 117,514
Administrative & general expense 387,907 366,830 370,202
Total operating expenses 1,113,697 1,221,821 1,220,136
Other Operating Expenses
Depreciation expense 612,568 601,765 616,868
Taxes 335,449 328,033 401,110
Total other operating expenses 948,017 929,797 1,017,978
Operating Income 653,613 527,498 439,873
Other Income (Expense)
Capital contributions from customers and municipal 1,189,564 10,900 111,511
Interest expense (78,569) (69,496) (56,679)
Amortization of debt-related costs (14,600) (13,406) (6,718)
Other 160,889 127,882 134,969
Total other income (expense) 1,257,283 55,880 183,083
Net Income 1,910,896 $ 583,378 $ 622,956 $
Regulatory Operating Income 742,216 534,315 511,098
Rate of Return 5.43 3.93 3.86
Authorized Rate of Return 6.50 6.50 6.50
Current Ratio 35.97 79.49 63.60
Months of Unrestricted Cash on Hand 25.90 26.68 28.81
Equity vs Debt 0.83 0.86 0.89
Asset Utilization 0.41 0.44 0.45
Note 1 - Water rates adjusted May 2012.
Definitions
Rate of Return - Return on investment in capital infrastructure. Should be near authorized rate of return.
Current Ratio - measure of liquidity or ability to pay obligations. Should be > 1.
Months of Unrestricted Cash on Hand - measure of reserves. Should be at least 2-3 months.
Equity vs Debt - Percent of infrastucture financed by operations. 50% is a good benchmark.
Asset Utilization - Illustrates the relative age of the system. Ratio of 1 indicates a system at full life expectancy.
WAUPUN UTILITIES
Income Statement and Financial Ratios
Water Utility
For the 12 Months Ending:
Page 6 of 11
Last 12 Months YTD 2026 YTD Budget Difference
WATER
Operating Revenues 2,677,987 $ 1,577,419 $ 1,557,215 $ 20,204 $
Operating Expenses
Source of supply expenses 4,706 2,966 336 2,630
Pumping expenses 105,145 67,676 52,003 15,673
Water treatment expenses 335,51 7 176,734 167,622 9,112
Transmission & distribution expenses 287,052 159,14 8 127,271 31,877
Customer accounts expenses 117,514 70,491 66,745 3,746
Administrative & general expense 370,202 223,100 260,312 (37,212 )
Total operating expenses 1,220,136 700,11 4 674,289 25,82 5 3.83%
Other Operating Expenses
Depreciation expense 616,868 344,570 365,67 3 (21,103 )
Taxes 401,110 198,76 8 185,031 13,737
Total other operating expenses 1,017,978 543,338 550,704 (7,366)
Operating Income 439,873 333,967 332,222 1,745
Other Income (Expense)
Capital contributions 111,511 - - -
Interest expense (56,679) (30,683) (30,681) (2)
Amortization of debt-related costs (6,718) (1,347) 1,505 (2,852)
Other 134,969 71,221 5,831 65,390
Total other income (expense) 183,083 39,191 (23,345 ) 62,536
Net Income 622,956$ 373,15 8$ 308,87 7$ 64,281 $
July 2026 June 2026 May 2026 April 2026 March 2026 Feb 2026 Jan 2026 D ec 2025 Nov 2025 Oct 2025 Sept 2025 Aug 2025 July 2025
WATER
Operating Revenues 243,62 8$ 232,16 6$ 236,31 8$ 218,35 9$ 214,41 9$ 212,85 5$ 219,67 3$ 218,05 3$ 215,88 8$ 222,03 5$ 218,04 6$ 226,54 6$ 231,44 6$
Operating Expenses
Source of supply expenses 114 - 2,557 - 182 112 - 1,740 - - - - -
Pumping expenses 7,079 13,921 7,489 6,444 9,335 12,223 11,185 9,429 6,371 6,327 7,732 7,610 8,312
Water treatment expenses 31,057 24,883 24,771 25,158 21,369 28,795 20,701 39,398 23,716 24,735 35,546 35,388 33,131
Transmission & distribution expenses 13,898 13,973 47,259 17,863 20,663 24,144 21,349 42,516 15,283 25,914 20,268 23,923 14,421
Customer accounts expenses 10,580 10,338 9,090 10,149 9,597 9,316 11,421 10,056 8,780 8,686 8,875 10,625 7,816
Administrative & general expense 30,282 26,771 27,528 14,546 49,245 32,930 41,798 46,976 17,431 27,923 22,907 31,865 33,678
Total operating expenses 93,010 89,886 118,692 74,160 110,392 107,520 106,454 150,115 71,580 93,587 95,327 109,412 97,358
Other Operating Expenses
Depreciation expense 49,224 49,224 49,224 49,224 49,224 49,224 49,224 84,739 46,890 46,890 46,890 46,890 46,890
Taxes 28,185 28,102 28,176 28,044 27,926 28,536 29,800 88,508 27,913 28,080 28,381 29,459 27,891
Total operating expenses 77,409 77,326 77,400 77,268 77,150 77,760 79,025 173,248 74,802 74,970 75,271 76,349 74,781
Operating Income 73,209 64,954 40,226 66,930 26,878 27,575 34,195 (105,310) 69,505 53,478 47,448 40,785 59,307
Other Income (Expense)
Capital contributions - - - - - - - 111,511 - - - - -
Interest expense (4,383) (4,383) (4,383) (4,383) (4,383) (4,383) (4,383) (5,199) (5,199) (5,199) (5,199) (5,199) (5,199)
Amortization of debt-related costs 786 786 786 786 (4,921) 215 215 (1,074) (1,074) (1,074) (1,074) (1,074) (1,074)
Other 8,445 12,716 11,686 10,755 2,454 13,401 11,763 13,590 15,034 6,737 12,123 16,264 6,927
Total other income (expense) 4,847 9,119 8,089 7,158 (6,850) 9,233 7,595 118,828 8,760 464 5,850 9,990 654
Net Income 78,057 $ 74,073 $ 48,315 $ 74,088 $ 20,027 $ 36,809 $ 41,790 $ 13,517 $ 78,266 $ 53,942 $ 53,297 $ 50,776 $ 59,961 $
WAUPUN UTILITIES
Detailed Income Statement and YTD Budget Comparison
Water Utility
For the Period Ended July 31, 2026
Page 7 of 11
SEWER July 2024 July 2025 July 2026
Operating Revenues 3,418,821 $ 3,319,657 $ 3,900,538 $
Operating Expenses
WWTP operation expenses 734,514 507,565 736,308
Laboratory expenses 111,073 112,310 108,342
Maintenance expenses 478,122 569,009 573,244
Customer accounts expenses 153,629 149,479 151,320
Administrative & general expenses 548,800 504,160 583,430
Total operating expenses 2,026,138 1,842,523 2,152,645
Other Operating Expenses
Depreciation expense 887,581 1,494,440 1,406,327
Total other operating expenses 887,581 1,494,440 1,406,327
Operating Income 505,103 (17,306) 341,566
Other Income (Expense)
Interest expense (309,469) (305,849) (292,874)
Capital contributions 1,899,165 1,455,971 507,557
Other 175,710 154,130 135,226
Total other income (expense) 1,765,407 1,304,253 349,909
Net Income (loss) 2,270,510 $ 1,286,946 $ 691,474 $
Operating Income (excluding GASB 68 & 75) 531,036 (85,501) 361,958
Rate of Return 3.21 (0.65) 2.85
Current Ratio 10.97 12.53 16.95
Months of Unrestricted Cash on Hand 7.07 8.03 11.21
Equity vs Debt 0.46 0.48 0.48
Asset Utilization 0.53 0.57 0.57
Debt Coverage 1.73 1.82 2.10
Minimum Required Coverage 1.20 1.20 1.20
Note 1 - Sewer rates adjusted April 2025.
Definitions
Rate of Return - Return on investment in capital infrastructure.
Current Ratio - measure of liquidity or ability to pay obligations. Should be > 1.
Months of Unrestricted Cash on Hand - measure of reserves. Should be at least 2-3 months.
Equity vs Debt - Percent of infrastucture financed by operations. 50% is a good benchmark.
Asset Utilization - Illustrates the relative age of the system. Ratio of 1 indicates a system at full life expectancy.
Debt Coverage - Earnings coverage of annual debt service. Must exceed 1.20
WAUPUN UTILITIES
Income Statement and Financial Ratios
Sewer Utility
For the 12 Months Ending:
Page 8 of 11
Last 12 Months YTD 2026 YTD Budget Difference
SEWER
Operating Revenues 3,900,538 $ 2,309,022 $ 2,225,085 $ 83,937 $
Operating Expenses
WWTP operation expenses 736,308 425,596 454,118 (28,521)
Laboratory expenses 108,342 62,915 66,269 (3,354)
Maintenance expenses 573,244 303,992 351,575 (47,583)
Customer accounts expenses 151,320 91,189 87,136 4,053
Administrative & general expenses 583,430 323,438 336,473 (13,035)
Total operating expenses 2,152,645 1,207,130 1,295,571 (88,441) -6.83%
Other Operating Expenses
Depreciation expense 1,406,327 1,057,038 1,035,895 21,143
Total other operating expenses 1,406,327 1,057,038 1,035,895 21,143
Operating Income (Loss) 341,566 44,854 (106,381) 151,235
Non-operating Income (Expense)
Interest Expense (292,874) (171,623) (171,626) 3
Capital contributions 507,557 994 - 994
Other 135,226 66,863 23,331 43,532
Total other income (expense) 349,909 (103,766) (148,295) 44,529
Net Income (Loss) 691,474 $ (58,912) $ (254,676)$ 195,763 $
July 2026 June 2026 May 2026 April 2026 March 2026 Feb 2026 Jan 2026 D ec 2025 Nov 2025 Oct 2025 Sept 2025 Aug 2025 July 2025
SEWER
Operating Revenues 337,459 $ 334,256 $ 348,997 $ 338,946 $ 308,030 $ 319,975 $ 321,358 $ 310,709 $ 305,007 $ 324,991 $ 317,794 $ 333,014 $ 330,709 $
Operating Expenses
WWTP operation expenses 76,572 53,815 66,174 54,151 42,378 66,129 66,377 82,257 43,632 45,844 71,614 67,364 80,953
Laboratory expenses 7,166 7,711 8,134 8,660 10,557 12,680 8,007 9,572 13,416 5,638 7,702 9,099 11,021
Maintenance expenses 44,180 75,396 61,182 41,577 23,901 29,721 28,036 63,889 36,593 77,891 29,638 61,242 38,338
Customer accounts expenses 13,687 13,296 12,235 13,828 12,323 11,958 13,860 12,070 11,304 11,675 11,714 13,367 10,674
Administrative & general expense 41,742 39,614 48,297 32,336 60,927 45,945 54,577 72,737 31,227 58,441 51,495 46,091 58,413
Total operating expenses 183,347 189,833 196,021 150,552 150,086 166,433 170,857 240,526 136,172 199,489 172,164 197,164 199,400
Other Operating Expenses
Depreciation expense 151,005 151,005 151,005 151,005 151,005 151,005 151,005 (247,197) 149,122 149,122 149,122 149,122 149,122
Total other operating expenses 151,005 151,005 151,005 151,005 151,005 151,005 151,005 (247,197) 149,122 149,122 149,122 149,122 149,122
Operating Income (Loss) 3,107 (6,582) 1,970 37,388 6,938 2,536 (505) 317,380 19,714 (23,619) (3,491) (13,271) (17,812)
Other Income (Expense)
Interest expense (24,518) (24,518) (24,518) (24,518) (24,518) (24,518) (24,518) (19,141) (25,528) (25,528) (25,528) (25,528) (25,528)
Capital contributions - - - - 994 - - 285,363 - - - 221,200 -
Other 7,479 12,633 11,330 10,302 332 13,400 11,388 13,474 15,226 6,515 13,771 19,376 6,517
Total other income (expense) (17,039) (11,885) (13,188) (14,216) (23,192) (11,118) (13,130) 279,696 (10,301) (19,012) (11,756) 215,049 (19,011)
Net Income (Loss) (13,931) $ (18,467) $ (11,217) $ 23,173 $ (16,253) $ (8,582) $ (13,635)$ 597,076 $ 9,412 $ (42,631)$ (15,248) $ 201,777 $ (36,823) $
WAUPUN UTILITIES
Detailed Income Statement and YTD Budget Comparison
Sewer Utility
For the Period Ended July 31, 2026
Page 9 of 11
ELECTRIC July 2024 July 2025 July 2026 June 2026 Change
Cash and investments - unrestricted 4,215,915 $ 4,586,545 $ 5,423,621 $ 5,378,693 $ 44,928 $
Cash and investments - restricted 126,394 129,933 1 1 -
Receivables 1,304,625 1,450,158 1,566,158 1,312,617 253,542
Materials and supplies 395,682 446,522 452,695 447,090 5,605
Other assets 89,999 99,834 122,958 124,461 (1,503)
Plant - net of accumulated depreciation 9,661,074 10,117,979 10,428,317 10,322,035 106,281
Deferred outflows of resources 803,475 559,453 384,433 384,433 -
Total Assets 16,597,164 17,390,424 18,378,183 17,969,330 408,853
Accounts payable 950,410 1,120,041 1,327,245 1,047,913 279,332
Payable to sewer utility - - - - -
Interest accrued 5,875 2,052 - - -
Accrued benefits 88,257 95,614 108,039 105,280 2,758
Deferred inflows of resources 1,412,576 1,323,736 668,368 673,137 (4,769)
Long-term debt 380,000 195,000 - - -
Net Position 13,760,046 14,653,980 16,274,531 16,143,000 131,531
Total Liabilities & Net Position 16,597,164$ 17,390,424$ 18,378,183$ 17,969,330$ 408,853 $
WATER July 2024 July 2025 July 2026 June 2026 Change
Cash and investments - unrestricted / designated 3,128,204$ 3,445,373 $ 3,892,273 $ 3,809,974 $ 82,299 $
Cash and investments - restricted 396,790 403,924 399,037 362,765 36,272
Receivables 254,778 256,640 264,465 250,685 13,780
Materials and supplies 86,458 109,211 108,938 108,985 (47)
Other assets 61,318 50,008 100,724 103,750 (3,027)
Plant - net of accumulated depreciation 16,481,723 16,162,682 15,812,864 15,859,253 (46,389)
Deferred outflows of resources 451,080 328,826 247,748 247,748 -
Total Assets 20,860,350 20,756,664 20,826,048 20,743,160 82,888
Accounts payable 65,259 22,556 44,680 45,263 (582)
Interest accrued 28,789 24,015 20,681 16,298 4,383
Accrued benefits 57,683 63,868 52,423 50,606 1,817
Deferred inflows of resources 645,696 469,925 394,007 394,793 (786)
Long-term debt 2,970,000 2,500,000 2,015,000 2,015,000 -
Net Position 17,092,923 17,676,301 18,299,257 18,221,201 78,057
Total Liabilities & Net Position 20,860,350$ 20,756,664$ 20,826,048$ 20,743,160$ 82,888 $
SEWER July 2024 July 2025 July 2026 June 2026 Change
Cash and investments - unrestricted 1,192,891 $ 1,233,636 $ 2,011,399 $ 1,931,736 $ 79,663 $
Cash and investments - restricted 2,425,810 2,625,373 2,494,717 2,410,779 83,938
Receivables 302,763 354,939 364,890 363,437 1,453
Receivable from electric utility - - - - -
Materials and supplies 8,597 8,693 8,507 8,507 -
Advances to other funds - - - - -
Other assets 61,345 46,630 73,785 77,244 (3,459)
Plant - net of accumulated depreciation 49,263,570 49,608,442 49,040,371 49,189,097 (148,726)
Deferred outflows of resources 729,543 501,909 383,452 383,452 -
Total Assets 53,984,519 54,379,622 54,377,121 54,364,252 12,869
Accounts payable 60,528 49,549 67,817 68,310 (492)
Interest accrued 75,843 77,193 72,401 47,883 24,518
Accrued benefits 87,374 96,888 90,173 87,398 2,775
Deferred inflows of resources 853,190 557,361 459,296 459,296 -
Long-term debt 26,533,400 25,937,500 25,334,800 25,334,800 -
Net Position 26,374,184 27,661,130 28,352,634 28,366,565 (13,931)
Total Liabilities & Net Position 53,984,519$ 54,379,622$ 54,377,121$ 54,364,252$ 12,869 $
WAUPUN UTILITES
Balance Sheets
Electric, Water, and Sewer
Page 10 of 11
Monthly Dashboard - Cash & Investments July 2026
Account Restrictions July 2026 June 2026 $ Inc/(Dec) % Inc/(Dec)
Checking ‐ E Unrestricted 822,463 $ 788,870 $ 33,592 $ 4.26%
Checking ‐ W Unrestricted 581,180 471,054 110,126 23.38%
Checking ‐ S Unrestricted 832,390 766,268 66,122 8.63%
Reserves ‐ E Unrestricted 4,170,480 4,160,487 9,992 0.24%
Reserves ‐ W Unrestricted 2,714,796 2,744,494 (29,698) ‐1.08%
Reserves ‐ S Unrestricted 1,179,009 1,165,468 13,541 1.16%
P&I Redemption ‐ E Restricted 1 1 ‐ 0.00%
P&I Redemption ‐ W Restricted 216,305 180,258 36,047 20.00%
P&I Redemption ‐ S Restricted 226,272 153,190 73,082 47.71%
Bond Reserve ‐ S Restricted 556,651 548,474 8,177 1.49%
Construction ‐ S Restricted 0 0 ‐ 0.00%
Depreciation ‐ E Restricted ‐ ‐ ‐ #DIV/0!
Depreciation ‐ W Restricted 182,732 182,506 225 0.12%
Capital Improve. ‐ E Designated 430,678 429,335 1,343 0.31%
Capital Improve. ‐ W Designated 102,927 102,604 323 0.31%
ERF ‐ Water Plant Designated 493,369 491,822 1,547 0.31%
ERF ‐ WWTP Restricted 1,711,794 1,709,115 2,679 0.16%
14,221,048$ 13,893,948 $ 327,100 $ 2.35%
Unrestricted and Designated 11,327,293$ 11,120,403 $ 206,890$ 1.86%
Restricted 2,893,755$ 2,773,545 $ 120,210$ 4.33%
$‐
$500,000
$1,000,000
$1,500,000
$2,000,000
Cash <12 mos. 13‐24 mos. 25‐36 mos. 37‐48 mos. 49‐60 mos. >60 mos.
Long‐Term Investment by Maturity
22%
11%
48%
9%
5%
5%Long‐Term Investments by Type
Cash/Money Markets
Certificate of Deposits
Muni Bonds
US Government
Government Agencies
Corporate Bonds
Page 11 of 11
Waupun Utilities
Pgs - Avoided Cost Parallel Generation Tariff Update
Chelsea Lisowe
Energy Services Manager, WPPI Energy
Jeff Stanek
Finance Director, Waupun Utilities
Parallel Generation Background
wppienergy.org 2
Sturgeon Bay filed on July 14, 2023
RENEW Wisconsin filed to intervene
New schedules effective July 1, 2026
Modeled after PSC approved IOU parallel generation schedules
Parallel Generation
• Pgs-1
Monthly net metered customers
Systems less than 20 kW
Excess generation credited at
avoi
ded cost
• MISO market based
• Incentive to size system to load
• Protects non-Pgs rat epayers
(Existing customers on Pgs tariff
grandfathered for 10 years)
wppienergy.org 3
Parallel Generation
• Pgs-2
Systems greater than or
equa
l to 20 kW
Excess generation credit rate
upd
ated quarterly (previously
yearly)
• MISO market based
avo
ided cost
Existing customers not
gra
ndfathered
wppienergy.org 4
Parallel Generation Next Steps
wppienergy.org 5
Multi-utility filing in October
30 WPPI members currently in the group filing
Simplified filing process
Full PSC Commission will decide
Expect effective date mid first
quarter 2027
wppienergy.org 6
Questions?
RATE FILE Sheet No. 1 of 2
Schedule No. Pgs-1
Public Service Commission of Wisconsin Amendment No. 99
STURGEON BAY ELECTRIC UTILITY
Parallel Generation (20 kW or less) -- Net Energy Billing
EFFECTIVE: July 1, 2026
PSCW AUTHORIZATION: Final Decision in Docket 5780-TE-111 issued April 6, 2026
1. Effective In
All territories served by the utility.
2. Availability
Available for single-phase and three-phase customers generating power using renewable
resource generators that satisfy the requirements of “qualifying facility” status under Part 292 of
the Federal Energy Regulatory Commission’s regulations under the Public Utility Regulatory
Policies Act of 1978 where a part or all of the electrical requirements of the customer are
supplied by the customer’s generating facilities located behind-the-meter (BTM) on the
customer’s premises, where such facilities have a total generating capability of 20 kW alternating
current (AC) or less, where such facilities are connected in parallel with the utility and where
such facilities are approved by the utility.
3. Rate
The customer shall be billed monthly on a net energy basis and shall pay the customer charge
and energy charge(s) specified in the rate schedule under which the customer is served. When the
energy produced exceeds energy consumed for the billing month, the customer shall be credited
for the excess energy volumes at the energy credit component (multiplied by the loss factor)
specified for BTM COGS in the utility’s Pgs-2 rate schedule, unless the customer qualifies for
the rate described in the next paragraph. The buy-back energy rates will be reset annually for
billing on or after February 1 of each year based on the most recent three-year average locational
marginal price of energy in MISO at the WEC.WPPI commercial pricing node.
The following customers will continue to be credited for net monthly excess generation at the
energy rate specified in the rate schedule under which the customer purchases energy, including
the monthly power cost adjustment clause (PCAC), until April 30, 2036: a) customers taking
service under this rate schedule prior to April 6, 2026;. A customer that makes changes to the
capacity or type of its generation facilities after April 6, 2026 will be treated as a new customer
and shall be subject to the standard avoided cost rate.
If, in any month, the customer’s bill has a credit balance of $100 or less, the amount shall be
credited to subsequent bills until a debit balance is reestablished. If the credit balance is more
than $100, the utility shall reimburse the customer by check upon request. Monthly credits shall
be computed by taking the net excess kilowatt-hours produced times the applicable energy
charge.
RATE FILE Sheet No. 2 of 2
Schedule No. Pgs-1
Public Service Commission of Wisconsin Amendment No. 99
STURGEON BAY ELECTRIC UTILITY
Parallel Generation (20 kW or less) -- Net Energy Billing
EFFECTIVE: July 1, 2026
PSCW AUTHORIZATION: Final Decision in Docket 5780-TE-111 issued April 6, 2026
4. Metering and Services Facilities
A customer who is served under a regular rate schedule shall have any ratchet and/or other
device removed from the meter to allow reverse power flow and measurement of net energy
used. Customers eligible for net energy billing but with existing metering facilities equipped
with ratchets or other devices preventing reverse registration (i.e. time-of-use metering facilities)
may request that the utility install the necessary metering to permit such billing.
Non-Standard Meter Service, if any, is not available for customers electing the Pgs-1 Schedule.
5. Customer Obligation
See Wis. Admin. Code ch. PSC 119; Rules for Interconnecting Distributed Generation Facilities.
6. Renewable Energy Credits and Benefits
All renewable energy credits and benefits, emissions allowances, or other renewable energy, air
emissions, or environmental benefits for which the customer’s generation system qualifies under
any existing or future applicable law shall remain the property of the customer.
RATE FILE Sheet No. 1 of 6
Schedule No. Pgs-2
Public Service Commission of Wisconsin Amendment No. 99
STURGEON BAY ELECTRIC UTILITY
Customer-Owned Generation Systems (Greater than 20 kW)
EFFECTIVE: July 1, 2026
PSCW AUTHORIZATION: Final Decision in Docket 5780-TE-111 issued April 6, 2026
1. Effective In
All territories served by the utility.
2. Availability
Available for single-phase and three-phase customers generating power using renewable
resource generators that satisfy the requirements of “qualifying facility” status under Part 292
of the Federal Energy Regulatory Commission’s regulations under the Public Utility
Regulatory Policies Act of 1978 who desire to sell excess generation to the utility from
behind-the-meter (BTM) customer-owned generation systems (COGS), or who sell all
generation to the utility from front-of-the-meter (FTM) COGS. For BTM COGS, a part or
all of the electrical requirements of the customer are supplied by the COGS located on the
customer’s premises. For FTM COGS, all of the generation is sold to the utility under an
executed service agreement between the COGS and the utility, and all of the customer’s
electricity usage is supplied separately by the utility under applicable retail service schedules.
In either case, BTM or FTM, such facilities shall have a total generating capability of greater
than 20 kW and less than or equal to 5 MW alternating current (AC), with such facilities
connected in parallel with the utility, and where such facilities are approved by the utility.
Customers not desiring to sell energy under this rate have the right to negotiate a buy-back
rate. If, in lieu of taking service under this rate schedule, a customer elects to sell their excess
generation to another utility or into the market administered by the Midcontinent Independent
System Operator, Inc. (MISO) the utility shall transport the customer’s excess generation
across the utility’s distribution system and shall recover actual costs of such transportation
from the generating customer.
3. Rate
Unless separately negotiated in accordance with paragraph 7 of this rate schedule, the utility
shall, for all energy sold to the utility, credit the COGS at the applicable avoided cost rate
specified below. The avoided cost rates will be reset annually for billing on or after February
1 of each year to reflect the then current value of each component shown in the table below:
a. For BTM COGS:
Customers shall receive monthly payments equal to the sum of the excess energy
volume (in kWh) in each On-Peak Hour of the month multiplied by the seasonal on-
peak buy-back rate plus the sum of the excess energy volume (in kWh) in each Off-
Peak Hour of the month multiplied by the seasonal off-peak buy-back rate. The
following table shows the components of these rates.
RATE FILE Sheet No. 2 of 6
Schedule No. Pgs-2
Public Service Commission of Wisconsin Amendment No. 99
STURGEON BAY ELECTRIC UTILITY
Customer-Owned Generation Systems (Greater than 20 kW)
EFFECTIVE: July 1, 2026
PSCW AUTHORIZATION: Final Decision in Docket 5780-TE-111 issued April 6, 2026
WINTER (December through February)
Component On-Peak Off-Peak
Energy Credit $0.0431/kWh $0.0358/kWh
Capacity Credit $0.0005/kWh $0.0000/kWh
Transmission Credit $0.0000/kWh $0.0000/kWh
Sub-Total $0.0435/kWh $0.0358/kWh
x Loss Factor 1.03 1.03
Total Buy-Back Rate $0.0448/kWh $0.0369/kWh
SPRING (March through May)
Component On-Peak Off-Peak
Energy Credit $0.0298/kWh $0.0241/kWh
Capacity Credit $0.0061/kWh $0.0000/kWh
Transmission Credit $0.0000/kWh $0.0000/kWh
Sub-Total $0.0359/kWh $0.0241/kWh
X Loss Factor 1.03 1.03
Total Buy-Back Rate $0.0370/kWh $0.0249/kWh
SUMMER (June through August)
Component On-Peak Off-Peak
Energy Credit $0.0523/kWh $0.0299/kWh
Capacity Credit $0.0328/kWh $0.0000/kWh
Transmission Credit $0.0000/kWh $0.0000/kWh
Sub-Total $0.0851/kWh $0.0299/kWh
X Loss Factor 1.03 1.03
Total Buy-Back Rate $0.0876/kWh $0.0308/kWh
FALL (September through November)
Component On-Peak Off-Peak
Energy Credit $0.0394/kWh $0.0282/kWh
Capacity Credit $0.0099/kWh $0.0000/kWh
Transmission Credit $0.0000/kWh $0.0000/kWh
Sub-Total $0.0493/kWh $0.0282/kWh
X Loss Factor 1.03 1.03
Total Buy-Back Rate $0.0508/kWh $0.0291/kWh
RATE FILE Sheet No. 3 of 6
Schedule No. Pgs-2
Public Service Commission of Wisconsin Amendment No. 99
STURGEON BAY ELECTRIC UTILITY
Customer-Owned Generation Systems (Greater than 20 kW)
EFFECTIVE: July 1, 2026
PSCW AUTHORIZATION: Final Decision in Docket 5780-TE-111 issued April 6, 2026
For BTM COGS, both the Energy Credit and the Capacity Credit will be based on
seasonal historical averages. The Energy Credit will be reset annually based on the
most recent three-year average locational marginal price of energy in MISO at the
WEC.WPPI commercial pricing node. The Capacity Credit will likewise be reset based
on the most recent three-year average annual capacity clearing price in the MISO
Planning Resource Auction.
b. For FTM COGS:
Customers shall enter into a service agreement with the utility and shall receive
monthly payments equal to:
[FTM Energy Credit + FTM Capacity Credit + FTM Trans Credit] x DLF
Where:
FTM Energy Credit = the sum of the energy produced by the FTM COGS (in kWh) in
each On-Peak Hour of the month multiplied by the seasonal on-peak Energy Credit
rate, plus the sum of the energy produced by the FTM COGS in each Off-Peak Hour of
the month multiplied by the seasonal off-peak Energy Credit rate. The seasonal FTM
Energy Credit rates are equal to the Energy Credit components specified in the table for
BTM COGS and will be updated annually as described there.
FTM Capacity Credit = (1/12) x (Applicable Net CONE) x (Cap of FTM COGS)
Applicable Net CONE = MISO’s Net Cost of New Entry (specified in $/kW-year)
effective when the FTM COGS and utility enter into a 10-
year service agreement, subject to extension in 5 year
increments at the end of the initial term and each
subsequent term. Net CONE shall be updated upon any
extension.
Cap of FTM COGS = MISO’s accredited capacity amount (in kW) then effective
for the FTM COGS at the time of the service agreement or
any extension thereof.
FTM Trans Credit = $0
DLF (Distribution Loss Factor) = 1.03
RATE FILE Sheet No. 4 of 6
Schedule No. Pgs-2
Public Service Commission of Wisconsin Amendment No. 99
STURGEON BAY ELECTRIC UTILITY
Customer-Owned Generation Systems (Greater than 20 kW)
EFFECTIVE: July 1, 2026
PSCW AUTHORIZATION: Final Decision in Docket 5780-TE-111 issued April 6, 2026
4. On-Peak and Off-Peak Hours and Holidays
On-Peak Hours: 8:00 a.m. – 8:00 p.m., Central Prevailing Time, Monday through Friday,
excluding Holidays.
Off-Peak Hours: All hours that are not On-Peak Hours.
Holidays: New Year’s Day, Memorial Day, Independence Day, Labor Day,
Thanksgiving Day, and Christmas Day, or the date celebrated as such.
5. Minimum Charge
The monthly minimum charge paid by the customer shall be the customer charge.
6. Power Factor
The customer shall maintain a minimum power factor as specified in Wis. Stats. Chapter PSC
119.20 (7).
7. Negotiated Rates
Customers with generation systems greater than 20 kW have the right to negotiate a buy-back
rate. The buy-back rate cannot be greater than the full avoided cost.
The following are the required procedure guidelines:
a. The utility must respond to the customer-owned generating system within 30 days of the
initial written receipt of the customer-owned generating system proposal and within
30 days of receipt of a subsequent customer-owned generating system proposal,
b. The utility’s rejection of the customer-owned generating system proposal must be
accompanied by a counter-offer relating to the specific subject matter of the customer-
owned generating system proposal, and
c. If the utility is unable to respond to the customer-owned generating system proposal
within 30 days it shall inform the customer-owned generating system of:
1) Specific information needed to evaluate the customer-owned generating system
proposal.
2) The precise difficulty encountered in evaluating the customer-owned generating
system proposal.
3) The estimated date that it will respond to the customer-owned generating system
proposal.
RATE FILE Sheet No. 5 of 6
Schedule No. Pgs-2
Public Service Commission of Wisconsin Amendment No. 99
STURGEON BAY ELECTRIC UTILITY
Customer-Owned Generation Systems (Greater than 20 kW)
EFFECTIVE: July 1, 2026
PSCW AUTHORIZATION: Final Decision in Docket 5780-TE-111 issued April 6, 2026
d. The Commission may become involved in the utility negotiations upon showing by either
the utility or the COGS that a reasonable conclusion cannot be reached under the above
guidelines. The Commission may provide a waiver to the guidelines and order new
negotiation requirements so that a reasonable conclusion can be reached.
e. A copy of all negotiated buy-back rates shall be sent to the Commission. These rates
shall not be effective until the contract is placed on file at the Commission.
8. Charges for Energy Supplied by the Utility
Energy supplied by the utility to the customer shall be billed in accordance with the rate
schedules of the utility under which the customer is served.
9. Maintenance Rate
A customer-owned generation facility may be billed lower demand charges for energy
purchased during scheduled maintenance provided written approval is obtained in advance
from the utility. Demand charges other than “Distribution Demand” shall be prorated if
maintenance is scheduled such that the utility does not incur additional capacity costs. Such
prorated demand charges shall be calculated as the demand charge rate times (the number of
days in the billing period minus the number of authorized days of scheduled maintenance),
divided by the number of days in the billing period.
10. Application Process and Customer Obligation
See Wis. Admin. Code ch. PSC 119, Rules for Interconnecting Distributed Generation
Facilities.
11. Utility Obligation
a. Metering Facilities
The utility shall install appropriate metering facilities to record all flows of energy
necessary to bill in accordance with the charges and credits of the rate schedule. To the
extent that the utility determines a separate meter is required for the generator, the utility
will charge a monthly meter charge of $8.00 for such meter. Non-Standard Metering
service is not available for customer metering under this schedule.
b. Notice to Communication Firms
Each electric utility shall notify telephone utility and cable television firms in the area
when it knows that a customer-owned generating facility is to be interconnected with its
RATE FILE Sheet No. 6 of 6
Schedule No. Pgs-2
Public Service Commission of Wisconsin Amendment No. 99
STURGEON BAY ELECTRIC UTILITY
Customer-Owned Generation Systems (Greater than 20 kW)
EFFECTIVE: July 1, 2026
PSCW AUTHORIZATION: Final Decision in Docket 5780-TE-111 issued April 6, 2026
system. This notification shall be as early as practicable to permit coordinated analysis
and testing in advance of interconnection, if considered necessary by the electric or
telephone utility or cable television firm.
12. Right to Appeal
The owner of the generating facility interconnected or proposed to be interconnected with a
utility system may appeal to the Commission should any requirement of the utility service
rules filed in accordance with the provisions of Wis. Admin. Code § PSC 119.40, or the
required contract be considered to be excessive or unreasonable. Such appeal will be
reviewed and the customer notified of the Commission’s determination.
13. Renewable Energy Credits and Benefits
All renewable energy credits and benefits, emissions allowances, or other renewable energy,
air emissions, or environmental benefits for which the customer’s generation system qualifies
under any existing or future applicable law shall remain the property of the customer.
TO: Waupun Utilities Commissioners
FROM: Steve Brooks, General Manager
DATE: September 14, 2026
SUBJECT: General Manager Report
2027 Budget Process
Staff continues to work through the 2027 budget process. Department heads have
submitted preliminary budgets for their respective departments, and staff is reviewing
and refining the numbers to ensure they align with operational needs and the overall
financial goals of the utility. We will continue to make adjustments as we work toward a
balanced and responsible 2027 budget.
A preliminary budget presentation is scheduled for the Utility Commission’s October
meeting. Staff will present the preliminary budget, along with high-level
recommendations and key areas of focus, as we work toward finalizing the 2027
budget.
Strategic Planning Session
I attended WPPI’s Strategic Planning Session on August 27–28. The session focused
on business plan priorities, power supply strategies, future capacity needs, and
extensions to existing power supply contracts. The discussions provided an opportunity
to look at the longer-term needs of member utilities and the strategies WPPI is
considering to ensure reliable and cost-effective power supply for its members.
Comtech Substation Transformer Failure Update
Staff has identified a suitable replacement transformer from an investor-owned utility
and has reached an agreement on the purchase price. Waupun Utilities has completed
the necessary cost estimates and provided the information to the insurance adjuster for
review and approval. We are currently working with the adjuster to obtain confirmation
of coverage so we can proceed with the purchase and installation of the interim
transformer.
The transformer will provide an interim solution while Waupun Utilities continues to
evaluate the long-term repair or replacement of the failed transformer.
Customers First Coalition Power Breakfast
Mayor Bishop, our Billing Representative, and I will attend the Customers First
Coalition’s annual Power Breakfast on September 15. The event brings together
policymakers, energy leaders, and stakeholders to discuss the key factors shaping
energy costs in Wisconsin.
This year’s discussion will focus on how global fuel markets, infrastructure investment,
and customer usage—particularly during Wisconsin winters—affect energy bills, as well
as the role effective utility regulation plays in managing these pressures. The event
provides an opportunity to stay informed on issues affecting our customers and the
utility industry.
WPPI Annual Conference
WPPI’s Annual Meeting will take place September 16–18, 2026, at Blue Harbor Resort
in Sheboygan, followed by the WPPI Board of Directors meeting on Friday morning. The
Annual Meeting brings together member utilities to discuss industry opportunities and
challenges, receive updates on key initiatives, and share ideas and experiences through
joint action.
Waupun Utilities will have one employee recognized at the conference for successfully
completing the WPPI Joint Action Leadership program.
This concludes my report for September 2026. Please contact me at 324-7920 or
sbrooks@waupunutilities.org with any questions or concerns.
TO: Waupun Utilities Commissioners
FROM: Owen Vande Kolk, Electric Operations Superintendent
DATE: September 14, 2026
SUBJECT: Electric Operations Report
Electric Department Update:
Call-Ins
On 8/17 at approximately 1:00 a.m., the lineman on call responded to an outage at 514 and 516
Maxon St. A tree branch fell on the service wires to the home. Power was restored at approximately
3:00 a.m.
On 9/4 at approximately 6:50 a.m., a tree at 462 E. Jackson St. fell and broke a three-phase corner
pole on E. Jackson St. The resulting outage affected approximately 90 customers. WU crews
replaced the pole and restored power to all affected customers at approximately 12:30 p.m.
Primary URD Cable Replacement
As part of our annual primary cable replacement plan, crews will be installing new conduit and primary
cable at three locations throughout the city:
• S. Harris Ave. to the Dodge County Housing Authority transformers
o Approximately 1,200’ of new conduit and primary cable.
• N. West St. feed to residential URD transformer
o Approximately 450’ of new conduit and primary cable.
• County Park Campground
o Approximately 800’ of new conduit and primary cable.
N. and S. Harris Pole Replacement
• Five 45’ three-phase poles have been installed on North and South Harris.
o The poles are part of a three-phase feeder out of the Main Sub that are aging.
o Two of the five poles will have new URD cable risers installed as part of the primary
URD cable replacement project mentioned above.
Development Planning
• City of Waupun Alley Project
o All new infrastructure has been installed. Crews will work with communication
companies to remove the old pole in advance of finish grading, concrete, and paving.
• Shaler Dr. Street Lighting Infrastructure
o Includes 21 new 30’ aluminum poles and concrete bases.
o Approximately 5,000’ of conduit and wire installation.
o A directional drilling contractor will be utilized from Claggett Ave. to Country View Dr.
• Site Planning and Utility Design for 60-Unit Housing Development
o Working with developer on electric easements, transformer and service locations, and
transformer sizing.
WPPI Shared Services
• GIS
o A GIS specialist from WPPI completed 34”x35” printable system maps.
o The maps will be available for use during a large-scale mutual aid event when internet
access or online mapping applications may not be readily available to responding
crews.
o Maps included:
▪ Feeder identification
▪ Fuse and three-phase switching locations
▪ Substations
▪ Transformer identification
This concludes my report for the September 2026 WU Commission Meeting. Please contact me at
324-7920 or ovandekolk@waupunutilities.org with any questions or concerns.
TO: Waupun Utilities Commissioners
FROM: Darren Sytsma
DATE: September 14, 2026
SUBJECT: Monthly Operation Report
Water Treatment Facility:
• Call-In Report
No call-ins to report.
• Operations
Both scale inhibitor pumps experienced a loss of flow. Staff diagnosed the
equipment, made repairs to the pump suction equipment, and restored proper
chemical flow to the RO skid.
Three members of the Treatment Facility staff attended a free Wells & Pumps –
Operations & Maintenance class held at Municipal Well & Pump on September 10.
A tentative schedule has been set for the week of October 5 to complete the radio
upgrade installation at the Water Plant, wells, towers, and lift stations.
Wastewater Treatment Facility:
• Call-In Report
ABNR alarms continue to cause call-ins and remote logins to acknowledge and clear
alarms. SCADA repair technicians have now included Allen Bradley in discussions to
help identify possible causes.
• Operations
Staff installed four temporary clarifier launder covers, which have proven successful
in eliminating unwanted algae growth in the clarifier troughs.
Utility staff met with BCC to discuss the City sewer use ordinance and the presence
of non-compliant material found in sewer lines during annual collection system
cleaning.
• Operations (continued)
The Treatment Facility department is now fully staffed with the addition of a new
Treatment Facilities Operator. Jeff brings previous water and wastewater experience
and holds full WDNR certifications for both water and wastewater treatment.
The recently promoted Treatment Facility Lead is continuing his education by attending
classes through CVMIC. He is currently enrolled in the Emerging Leader Certification
Program.
Treatment Facility Operator David has attended several Wisconsin Rural Water
Association groundwater and distribution classes in preparation for his upcoming
WDNR testing in November.
Thirty WPPI staff members were given an overview of the Water and Wastewater
Treatment Facilities, followed by a tour of the Control Room, Laboratory, and the ABNR
treatment process.
Next week, we will be hosting the Municipal Environmental Water and Wastewater
Groups (MEG). MEG Wastewater will hold its meeting in the morning, followed by a
brief tour of the ABNR facility. MEG Water will then hold its meeting after lunch.
Steve, Jen, and I met with Greater Envision Fond du Lac’s Business Retention and
Expansion staff to discuss how they could help us connect with others in the county and
further develop future connections. As a result of this meeting, Jen and I will be meeting
with staff at the MPTC Fond du Lac Campus later this month to tour the facility and
discuss learning opportunities available to Treatment Facility staff related to the
Industrial Electrician Apprenticeship and the Electricity and Electromechanical
Technology programs.
This concludes my report. Please do not hesitate to contact me with your questions or
concerns at 324-7920 or dsytsma@waupunutilities.org.
TO: Waupun Utilities Commissioners
FROM: Matt Geschke
DATE: September 14th, 2026
SUBJECT: Monthly Operation Report
Collection and Distribution Crew
Call-In Report
• On Thursday, August 27, staff responded to 306 E. Main St. for a copper water se rvice that had been
damaged by a contractor. Upon arrival, staff found that the copper service had been pulled out of the
building, which caused the water meter to break and resulted in damage to some of the internal plumbing.
Staff contacted a local plumber to complete the necessary repairs to the internal plumbing in the
basement. Once the plumbing repairs were completed, Waupun Utilities staff installed a new water meter
and restored water service.
• On Saturday, September 5, staff responded to 320 E. Main St. for a low water pressure complaint. Upon
arrival, staff determined that the newly installed curb stop had not been fully opened following the
contractor's installation of the new water service. Staff fully opened the curb stop, restoring proper water
pressure to the property.
Water Distribution Operations
• Valve exercising continues throughout the system. Staff currently have approximately one more week of
valve exercising work remaining. Once valve exercising is completed, staff will begin hydrant
maintenance.
Sanitary Sewer Operations
• Staff continue to flush sanitary mains throughout the city as part of ongoing sanitary sewer maintenance.
• Staff also replaced the sanitary lateral at 708 Tulip Lane due to a significant sag in the lateral that was
causing recurring sewer backups. The existing lateral was removed and a new sanitary lateral was
installed to correct the issue.
• Staff also capped an unused sanitary lateral at the new Pelton Development. The lateral was capped
because it will not be utilized as part of the new development.
North Alleyway Reconstruction Update
• All water main installation has been completed, tested, and placed into service throughout the project.
Staff have removed all temporary water lines.
• All fire hydrants are active and ready for use. Fire flow testing will be completed after the asphalt has
been installed.
• All sanitary sewer main and sanitary laterals have also been installed throughout the project.
Shaler Drive Extension Update
• All water main installation has been completed and tested. The remaining work is to complete a fire flow
test on one hydrant.
This concludes my report. Please do not hesitate to contact me with your questions or concerns at 324-7920 or
mgeschke@waupunutilities.org.
TO: Waupun Utilities Commissioners
FROM: Chelsea Lisowe, Energy Services Manager
DATE: September 14, 2026
SUBJECT: Energy Services Manager Report
• Thank you to Waupun Utilities for hosting WPPI’s August MRCS (Member Relations,
Communications, & Services) department meeting
o Tour of WWTP was very well received
• Power Partner Rewards Events (Residential Smart Thermostat Adjustment Program)
o 9/1: 3-5pm
o 9/3: 5-7pm
• WPPI Annual Meeting, 9/16-18, Blue Harbor Resort- Sheboygan
o Wed: Public Power Golf Open
o Thurs: Awards, program speakers, breakout sessions
▪ Topics include: industry changes, data centers, AI, state of WPPI, policy,
finance & rates, power supply, customer engagement & technology, utility
governance
o Fri: BOD meeting
• Public Power Week, October 4-10th
o Third grade poster coloring contest again
o Raffle of electric powered items for residential customers