Plan & Review Commission and Public Hearing — Agenda packet
Town of Spider Lake · Sawyer County · Plan & Review Commission and Public Hearing · meeting of Sep 2, 2026 · Agenda packets
Open the original document More from Town of Spider Lake
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
CUP 26-03
Robert & Charlyn Lovely
11262W Murphy Blvd
Solar Array Installation
September 2, 2026 Public Hearing for CUP 26-03
50'-1
3 4"
66'-9"
M
TRENCHING REQUIRED FROM SOUTH
WALL OF DWELLING TO ARRAY
30'-3
1
2"
14'-1
1
4"
15° FROM NORTH
15°
446'-0" TO METER (NTS)
260'
GROUND-MOUNTED ARRAY
ARRAY TILT: 30°
AZM180
PROJECT: 11262 W MURPHY BOULEVARD
MUNICIPALITY: HAYWARD, WI
ZIP CODE: 54843
CLIENT: ROBERT LOVELY & CHARLYN LOVELY
AUTHOR: ----
DATE: 14/JUL/26
REV: -
TOTAL ENERGY CAPACITY: 27.0 KWH9.440 KW DC-STC / 11.500 KW AC
TRUNORTH SOLAR LLC
PHONE: (612) 888-9599
TRUNORTHSOLAR.COM
PANEL LAYOUT
G2
LEGEND
METER
M
Engineering Stamp Location Height: 1.5700 Width: 1.5700 Scale: 1 Municipality: HAYWARD, WI
Engineering Stamp DPI
SCALE: 1"=40'
NOTES:
- SOLAR PANEL LAYOUT SUBJECT TO CHANGE ACCORDING TO EXISTING CONDITIONS
- SCALE AS SHOWN
- ALL DIMENSIONS IN FEET UNLESS OTHERWISE STATED
MODULE WATTAGE: 590 W
NUMBER OF PANELS: 16
SYSTEM SIZE: 9.440 kW
GROUND-MOUNTED ARRAY
PROJECT: 11262 W MURPHY BOULEVARD
MUNICIPALITY: HAYWARD, WI
ZIP CODE: 54843
CLIENT: ROBERT LOVELY & CHARLYN LOVELY
AUTHOR: ----
DATE: 14/JUL/26
REV: -
TOTAL ENERGY CAPACITY: 27.0 KWH9.440 KW DC-STC / 11.500 KW AC
TRUNORTH SOLAR LLC
PHONE: (612) 888-9599
TRUNORTHSOLAR.COM
RACKING SPECIFICATIONS
A2
Engineering Stamp Location Height: 1.5700 Width: 1.5700 Scale: 1 Municipality: HAYWARD, WI
Engineering Stamp DPI
MEETING MINUTES
Town of Spider Lake
Plan and Review Commission Meeting
August 5, 2026
1. Chair Delaney called the meeting to order at 6: 00 pm. Present were Vice Chair
Johnson and Commissioners Becker and Tumbleson, Alternate Commissioner
Julie Rudolph and Zoning Administrator Mike Gardner.
2. Motion to approve the Agenda made by Don Becker, seconded by Quentin
Johnson. All in favor; motion carried.
3. Pledge of Allegiance
4. Motion to approve the Minutes of the July 1 , 2026 P&RC Meeting made by
Johnson, seconded by Tumbleson. All in favor; motion carried.
5. CSM Review – Spider Lake Properties LLC – creation of Outlot 1: The
Preliminary plat for the Outlot was not accompanied by a statement of purpose.
Owner Matt Pobloske will propose language which specifies that the Outlot will
contain the golf course maintenance and storage structure and will be associated
with golf course operations.
6. Zoning Administrator’s Report: ZA Gardner reported new and follow-up project
conversations and prospective owner inquiries, with nine permit applications for
review.
a. Permit Applications:
i. DW 26-01 – Spider Lake Properties LLC (Pobloske) Lot 1
ii. DW 26-02 – Spider Lake Properties LLC (Pobloske) Lot 2
iii. DW 26-03 – Spider Lake Properties LLC (Pobloske) Lot 3
iv. DW 26-04 - Spider Lake Properties LLC (Pobloske) Lot 4
The four Spider Lake Properties LLC driveway permits were
discussed together, as they are adjacent and under common
ownership. Road Superintendent Don Fogal has endorsed the
proposed driveway locations. Motion to approve driveway permits
DW 26-01, 26-02, 26-03 and 26-04 made by Johnson, seconded by
Tumbleson. All in favor; motion carried.
v. LUP 26-26 – Guzzo – Accessory building – Garage: As all
Ordinance requirements are met, Motion to approve LUP 26-26
made by Becker, seconded by Rudolph. All in favor; Motion
carried.
vi. DM 26-03 – Vervelde – Cabin demolition
vii. LUP 26-27 – Vervelde – New Dwelling
The Vervelde applications were discussed together, as the owner
proposes to demolish the existing cabin and replace it with a new
dwelling. As all Ordinance requirements are met, Motion to
approve both DM 26-03 and LUP 26-27 made by Johnson,
seconded by Becker. All in favor; motion carried.
viii. LUP 26-29 – Scrivner – stairs/walkway to lake: As all Ordinance
requirements are met, Motion to approve LUP 26-29 made by
Becker, seconded by Rudolph. All in favor; Motion carried.
ix. LUP 26-30 – Kenney – New Dwelling: Mr Kenney clarified intent on
building height and setbacks, and as all Ordinance requirements
are met, Motion to approve LUP 26-30 made by Johnson,
seconded by Becker. All in favor; Motion carried.
b. Notices and anticipated activity
i. Citations: A Citation was issued to Terence Frick for a trailer in
violation of Ordinance 17-88. As of the August 5 P&RC meeting,
the trailer has been removed from the site. A Citation has also
been issued to Kevin Kroll, whose trailer remains on site and in
violation of the Ordinance.
7. Land Use Ordinance 17-88 update: Thor Jeppsen, Project Lead with von Briesen
& Roper (vB&R) provided an overview of Phase I activity. Rationale for
clarification and simplification was shared and is reflected in a proposed Phase I
draft. Delaney will create a process to document specific feedback from the
P&RC and return it to vB&R for further discussion.
8. As there was no other business coming before the Commission, Motion to
adjourn was made by Johnson, seconded by Becker. All in favor; motion
carried.
Respectfully submitted,
Sarah Delaney
Plan & Review Commission Chair
August 9, 2026
CONSTRUCTION MAY NOT BEGIN UNTIL THE PERMIT IS ISSUED AND A PERMIT CARD POSTED AT THE PROPERTY ENTRANCE.
This is a Three (3) page document. Be sure to complete all pages
Print Or Type – Use Black Ink
Agent/Builder_________________________________________
Mailing
Address_____________________________________________
City________________________ State______ Zip___________
Property
Owner__________________________________________________
Mailing
Address________________________________________________
City___________________________ State______ Zip___________
Day Phone______________Email___________________________
Daytime Phone________________________
Site Information (From Real Estate Property Tax Bill)
Gov’t Lot_____ _____1/4____1/4, Sec._____ Twn._____N R____W Alternate/Legacy ID: __ __ __ - __ __ __ - __ __ - __ __ __ __
Description: ____________________________________________________________________________________________________
Site Address: ____________________________________ Deed Document #___________ Acreage ________ _______________
Sanitary Permit #_______________ Date_______________ Issued By________________
Or:
Year Installed_______________ Owner When Installed:______________________________
Zone District: R-1 RR-1 RR-2 A-1 C-1 I-1 F-1
Wetland/Shoreland: Yes No (Shoreland: The area of frontage on navigable waters measured from the normal high-water elevation within one
thousand (1,000) feet from lakes, ponds and flowages; and three hundred (300) feet from rivers and streams.)
Permit Requested For
New
Dwelling
Type of Dwelling
Frame built on site
Modular/manufactured
Other_____________
Type of Construction
Frame Log Pole/Metal
Block Other______
# of
Bedrooms
# of
Stories
Walk Out
Yes
No
Loft
Yes
No
Attached Garage
Yes No
_____X_____=_____SF
Deck Yes No
_____X_____=_____SF
Footprint of Proposed
Structure
_____X_____=_____SF
Total Habitable Sq. Ft.
_________________
Hght of Structure
Grade to Peak
___________
Construction Cost
$ _____________
Addition
To
Dwelling
Use of Addition
Living room Kitchen Bathroom
Bedroom Garage Deck
Storage Building Screened Porch
Other_____________
Bedrooms
Existing
Additional
Total
# of Stories
Loft
Yes
No
Size of Proposed Structure
______X______=______SF
Total Habitable Sq. Ft.
___________________
Hght of Structure
Grade to Peak
___________
Construction Cost
$ _____________
Accessory
Structure
# of
Stories
Type of Accessory Structure
Garage Storage Building Gazebo
Screen house Greenhouse
Other___________
Size of Proposed Structure
______X______=______SF
Hght of
Structure
Grade to Peak
__________
Construction Cost
$ _____________
Addition To
Accessory
Structure
Size of Existing Accessory Structure
______X______=______SF
Size of Proposed Addition
______X______=______SF
Hght of Structure
Grade to Peak
__________
Construction Cost
$ _____________
Other/ Misc
Foundation Replacement
Roof Structure Replacement
Other_____________________
Stairs/Walkways Within 75’ Of OHWM
Area Involved
______X______=______SF
Hght of Structure
Grade to Peak
__________
Construction Cost
$ _____________
Use of Land Filing Dredging Grading > 10,000 S.F. Grading Other__________
Home Occupation/
Professional Office
Type of Business________________________________
Located in Existing Dwelling
Located in Existing Accessory Structure
(Not more than 1 nonresident person may be employed on the premises)
Total Area of Existing Building_______________SF
Area Being Used for Business
(May not exceed 25% of the total floor area of the dwelling 750 sq. ft. in an
accessory building)
__________X__________=__________SF
Alternative or Renewable Energy Systems Solar Wind
Other_____________________
Construction Cost
$ _________________
Communication
Systems
Cell Tower Height of Tower:__________________
Other_____________________
Construction Cost
$ _________________
Application for Land Use/Building Permit
Town of Spider Lake
Sawyer County, Wisconsin
Application No._________________
(Attach Copy Of Approved
Sawyer County Sanitary Permit)
Page 1 of 3 TOWN OF SPIDER LAKE
ZONINGADM 5.25.16
pplication No._____________A _________
LUP 26-28
Other New
Building/Structure
(e.g., Commercial,
Industrial,
Agricultural)
Other New Addition
To
Building/Structure
(e.g., Commercial,
Industrial,
Agricultural)
Use of Building/Structure
Type of Construction:☑
Height from Grade to Peak
Use of Building/Structure
Frame Log ✓Pole/Metal Block Other
Construction Cost: $
Type of Construction:☑Frame Log Pole/Metal Block ☑Other
Height from Grade to Peak Construction Cost: $
SITE PLAN REQUIREMENTS
Size of Proposed Structure
✗= SF
Total Area of Existing
Structure: SF
Size of Proposed Structure
X = S
Draw a site plan on the NEXT PAGE OR A SEPARATE PIECE OF PAPER (NOT TO EXCEED 8½ x 14) to illustrate the following 7
requirements:
Failure to illustrate the 7 requirements WILL RESULT IN THE PERMIT APPLICATION BEING RETURNED!
All measurements are from the furthest extension of the structure (eaves, overhangs, etc) to the nearest point of a setback
When measuring setback distance on a sloping building site, the measurement must be done on a horizontal (flat) measuring line.
1. Draw lot and write in lot line dimensions and indicate
North with an arrow
2. Show the location and name of any bordering roads,
and indicate North.
3. Show the location and size of all existing and proposed
structures
4. Show the location of any lake, river, stream, pond or
wetlands.
5. Show the location of the well, septic tank and drain field.
6. Show dimensions in feet on the following:
a. Structure to all lot lines
b. Structure to centerline of road
c. Structure to lake, river, stream, pond or wetlands
d. Structure to septic system/privy and well
e. Distance between structures
7. Show location vegetation protection area and proposed
Viewing/Use Corridor on lake lots.
Shoreline Vegetation Protection Area: (Not applicable for nonshoreland permits)
Owner's signature is required on the appropriate attached Shoreland Preservation Agreement.
This permit cannot be issued without a signed shoreland Preservation Agreement.
Shoreland Impervious Surface: (Not applicable for nonshoreland permits)
Total land area within 300' of the water body: (A)
Total impervious surface area (including this project) (B)
In the event this application is approved by the Zoning Office, I agree:
(B)/(A) x 100 = % Used
(Shall not exceed 15% or 25% with a conditional use permit
• That no work shall commence until I have received the issued Land Use Permit, and the Permit Card is posted
That all work shall be done in accordance with the requirements of the Town of Spider Lake Land Use Permit, the Town of Spidel
Lake Land Use Ordinance, all other applicable County Ordinances and the laws and regulations of the State of Wisconsin,
That the signing of this application grants permission to allow free and unlimited access to the property for onsite inspections
between the hours of 8:00 AM -6:00 PM Mon - Fri to the Zoning Administrator(s) and/or Plan & Review Commissioners.
I (we) declare that this application (including any accompanying information) has been examined be me (us) and to the best of my (our) knowledge and belief i
is true, correct and complete. I (we) acknowledge that I (we) am (are) responsible for the detail and accuracy of all information I (we) am (are) providing and that
it will be relied upon by the Town of Spider Lake in determining whether to issue a permit. I (we) further accept liability which may result of the Town of Spider
Lake relying on this information I (we) am (are) providing in or with this application.
Signature of Owner or (Agent with Power of Attorney)
Pirt Nane: KOBERT LOVELY
You must complete the attached plot plan
Fees: See Fee Schedule
Sign:
Checks should be made payable to: Treasurer of the Town of Spider Lake.
An Additional fee will be required for each inspection over
Dat 7/31/2026
Submit Completed Application And Fee To:
Town of Spider Lake Clerk
10896 W Town Hall Rd.
Hayward, WI 54843
Permit issued by
Permit denied by
Expiration Date
OFFICE USE ONLY
Date Fee $ Check #
Date ☑See attached for reason of denial
Signature of Zoning Administrator
Sheet 2 of Sheets 2
SURVEYOR’S CERTIFICATE
I, TODD C. GOOLD, A PROFESSIONAL LAND SURVEYOR IN THE STATE OF
WISCONSIN, HEREBY CERTIFY THAT THIS MAP IS A CORRECT REPRESENTATION OF THE
LAND SURVEYED, EXTERIOR BOUNDARIES, AND THE DIVISION THEREOF:
A DIVISION OF DEED DOC# 446969, LOCATED IN GOVT. LOT 1, SECTION 28 - T42N - R7W, TOWN
OF SPIDER LAKE, SAWYER COUNTY, WISCONSIN.
DESCRIBED AS FOLLOW:
BEGINNING AT THE NORTH 1/4 CORNER OF SECTION 28 - T42N - R7W, THENCE S89°10'03"E
213.45';
THENCE S51°47'57"E 114.27';
THENCE N50°35'40"E 47.82';
THENCE N06°52'40"E 38.68';
THENCE S89°10'03"E 935.64';
THENCE S53°47'46"W 279.52';
THENCE S45°30'42"W 357.02';
THENCE S40°38'55"W 203.66';
THENCE S40°45'22"W 6.30';
THENCE ALONG A CURVE TO THE LEFT, C7#, CB - S34°11'38"W, CD - 287.59', RADIUS - 1276.04',
DA - 12°56'27", LENGTH - 288.20';
THENCE ALONG A CURVE TO THE RIGHT, C8#, CB - S41°45'39"W, CD - 86.83', RADIUS - 188.00',
DA - 26°42'18", LENGTH - 87.62';
THENCE S27°53'41"E 240.19';
THENCE N64°44'12"W 303.61';
THENCE L107, N05°09'14"E 66.86';
THENCE L110, N78°56'02"W 66.11';
THENCE L111, S05°03'24"W 109.99';
THENCE L112, N58°56'21"W 52.73';
THENCE L113, N52°49'54"W 94.02';
THENCE L114, N43°24'57"W 114.54'
THENCE N00°58'28"W 841.68' BACK TO THE POINT OF BEGINNING.
THIS SURVEY WAS MADE IN COMPLIANCE WITH CHAPTER 236.34 OF WISCONSIN STATUTES,
AE-7 OF THE WISCONSIN ADMINISTRATIVE CODE AND THE SUBDIVISION REGULATIONS OF
TOWN OF SPIDER LAKE AND THAT I HAVE SURVEYED, DIVIDED AND MAPPED THE LAND HEREIN
DESCRIBED, AND THE MAP IS A CORRECT REPRESENTATION OF THE SURVEY MADE TO THE BEST
OF MY KNOWLEDGE AND BELIEF. THIS SURVEY WAS MADE UNDER THE DIRECTION OF SPIDER
LAKE PROPERTIES LLC – MATT POBLOSKE
_________________
TODD C. GOOLD
PROFESSIONAL LAND SURVEYOR
WISCONSIN REG# S-2489
8/19/2026
Approved this _____ day of _______, 2026
_____________________________________________
Approved by: QUENTIN JOHNSON, Chair, Town of Spider Lake
SHEET 1 OF 1 SHEETS
Proposed Lot Line Change
of part of the SW 1/4 - NW 1/4
of Section 21, Township 42 North, Range 6 West
Town of Spider Lake, Sawyer County, Wisconsin
26034
YUNKER LAND SURVEYING, LLC
N
S
E
50665 Otto Olson Rd., Grand View, WI 54839
yunkerlandsurveying.com
Green Point Rd.
LOT 1
LOT 3
LOT 2
75'300' 150' 0'
SCALE: 1" = 150'
Sawyer County, WI
Addresses
Parcels
Parcel Numbers
Towns
County Outlines
Lakes and Rivers
Local and Other Roads
CITY STREET
COUNTY HWY
PRIVATE ACCESS
STATE HWY
TOWN ROAD
US HWY
CSM for Marvin & Candace Ramsay Proposal to join together two adjacent owned parcels (tax id 31019 and 45980).
Town of Spider Lake
Zoning Report
August 2026
Date Permit# Name Address Descrip1on Construc1on
Cost
Total
Sq Ft
Fee
8/7,8,23 Pierre 9261W Upper A Rd LUP Inquiry
8/8,25 Kamps 8182W Nowak Rd Pre purchase inquiry
8/10,20 Carlson 11006W Shore Acres DR
8/10 Ludewig Lovely CUP , LUP
8/10 LUP
27,29,30
Permit follow ups, DM 26-03
8/10 Ramsey CSM review
8/11 Marissa 8359W Hwy 77 Pre purchase inquiry
8/14 Waltho Parcel, CSM inquiry
8/17 Romansko Pederson Rd Address issues
8/17 Gavin Deck replacement inquiry
8/17,19 Dums Mork LUP inquiries
8/18,27 Yunker 8854W Green Pt Rd Surveyor lot, CSM inquiries
8/19 LUP 26-
25
Morelock LUP copy request
8/21 Boss
InspecVons
Contacted re policy on LUP
documents for UDC applicaVon
8/21 Loons on Ole DM applicaVon review
8/21,22 E. Hanson Temporary sign violaVon noVce
8/21 Mork LUP applicaVon review
8/21 Ballard A[orney document request,
Kroll mail receipt
8/23 O’Malley Tiny home inquiry
8/24 Kamps 8359W Hwy 77 Pre purchase inquiry
8/25 J. Hanson 9324W Birchwood Dr Porch replacement inquiry
8/25 Schroeder 10575W Murphy Blvd LUP inquiry
8/25 Precise
Exteriors LLC
Roofing contractor inquiry
8/26,27 Kastrosky Nelson LUP review
DM 26-04
LUP 26-31
DM 26-05
LUP 26-32
SECTION 11.0 SUPPLEMENTAL USE REGULATIONS 64
11.1 Purpose 64
11.2 Applicability 64
11.3 Accessory Dwelling Units 64
11.4 Mobile Home Parks 64
11.5 Multifamily Dwellings 65
11.6 Townhouse 66
11.7 Bed and Breakfasts 67
11.8 Home Occupations 67
11.9 Accessory Renewable Energy Systems 68
11.10 Anaerobic Digester Systems 70
11.11 Boathouses 70
11.12 Marinas 70
11.13 Resorts 71
11.14 Campgrounds and Trailer Camps 73
11.15 Major Recreational Equipment / Vehicles 74
11.16 Recreation / Youth Camps 75
11.17 Event Venues and Wedding Barns 75
11.18 Drive-in and Drive-Through Establishments 75
11.19 Fueling Stations 75
11.20 Accessory Electric Vehicle Charging 76
11.21 Primary Electric Vehicle Charging Facilities 76
11.22 Vehicle Sales and Rentals 77
11.23 Vehicle Service and Repair 77
11.24 Entertainment Facilities and Amusement Parks 78
11.25 Shooting Ranges (Outdoors) 78
11.26 Food Trucks and Mobile Food Vendors 79
11.27 Kennels and Animal Boarding 79
11.28 Breweries, Wineries and Distilleries 79
11.29 Agricultural Activities 80
11.30 Horses and Equestrian Uses 80
11.31 Sod / Topsoil Removal for Resale 80
11.32 High-Voltage Transmission Lines and Public Utility Facilities 80
11.33 Commercial-Scale Solar Facilities 81
11.34 Commercial-Scale Wind Facilities 82
11.35 Mobile Service Facilities (Cellular) 83
11.36 Sewage Treatment and Disposal Facilities 85
11.37 Landfills and Solid Waste Disposal Sites 86
11.38 Sawmills and Wood Processing Facilities 86
11.39 Data Centers 87
GREEN: referenced in current Ordinance
BLUE: new use in proposed draftDRAFT- for
discussion
11.40 Contractor Yards and Storage Yards 88
11.41 Light Industrial Uses 89
11.42 Salvage and Junk Yards 90
11.43 Transportation Terminals 92
11.44 Mineral Extraction 93
Source: Town of Spider Lake website. First collected Oct 7, 2026.