Plan & Review Commission — Agenda packet
Town of Spider Lake · Sawyer County · Plan & Review Commission · meeting of Aug 5, 2026 · Agenda packets
Open the original document More from Town of Spider Lake
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
MEETING MINUTES
Town of Spider Lake
Plan and Review Commission Meeting
July 1, 2026
1. Chair Delaney called the meeting to order at 6:00 pm. Present were Delaney,
Vice Chair Johnson and Commissioners Capes and Tumbleson, and Zoning
Administrator Mike Gardner.
2. Motion to approve the Agenda made by Johnson, seconded by Capes. All in
favor; motion carried.
3. Pledge of Allegiance
4. Motion to approve the Minutes of the June 3, 2026 P&RC Meeting made by
Capes, seconded by Johnson. All in favor; motion carried.
5. Zoning Administrator’s Report: ZA Gardner reported numerous conversations
accompanying the high activity, with ten permit applications for review.
a. Permit Applications:
i. DM 26-02 – Boone – cabin demolition
ii. LUP 26-17 – Boone – new dwelling
The Boone applications were discussed together, as the owner proposes
to demolish one cabin and replace with a new dwelling. As all
Ordinance requirements are met, Motion to approve both DM 26-
02 and LUP 26-17 made by Johnson, seconded by Capes. All in
favor; Motion carried.
iii. LUP 26-18 – Hannula – addition to dwelling: Ordinance and Condo
Association setbacks are met, and discussion centered on the existing
septic system (whether it was sufficient to accommodate the addition).
Motion to provisionally approve LUP 26-18 pending confirmation by
Sawyer County H&HS that the septic system is acceptable made by
Johnson, seconded by Capes. All in favor; Motion carried.
iv. LUP 26-19 – Chelsea Real Estate – walkway/stairs replacement: As all
Ordinance requirements are met, Motion to approve LUP 26-19
made by Capes, seconded by Johnson. All in favor; Motion
carried.
v. LUP 26-20 - Madalon – deck replacement: As all Ordinance
requirements are met, Motion to approve LUP 26-20 made by
Johnson, seconded by Capes. All in favor; Motion carried.
LUP 26-21 – Romashko – Accessory Building – garage: As all Ordinance
requirements are met, Motion to approve LUP 26-21 made by
Capes, seconded by Johnson. All in favor; Motion carried.
vi. LUP 26-22 – DR Barratt (Great Outdoor Club) – storage building
vii. LUP 26-23 – DJ Barratt (Great Outdoor Club) – storage building
viii. LUP 26-24 – McGann (Great Outdoor Club) – storage building
The Great Outdoor Club applications were discussed together, as all three
are identical accessory structures with placements of all three adjacent to
existing storage sheds. As all Ordinance requirements are met,
Motion to approve LUP 26-22, 26-23 and 26-24 made by
Johnson, seconded by Capes. All in favor; Motion carried.
ix. LUP 26-25 – Morelock – new dwelling: As all Ordinance requirements
are met, Motion to approve LUP 26-25 made by Capes,
seconded by Johnson. All in favor; Motion carried.
b. Notices and anticipated activity
i. Correction Notices – Kroll, Frick: Trailers owned by Kroll and Frick
are still on location and remain in violation of the Ordinance. The
Town’s legal counsel continues to work through the Kroll’s attorney
and a Citation was issued to Terence Frick. No response from Mr.
Frick at the time of the meeting.
ii. The DNR has posted notice that a completed application has been
received to apply for a dredging permit
6. Land Use Ordinance 17-88 update: Thor Jeppsen, Project Lead with von Briesen
& Roper (vB&R) provided a written overview of June activity, which included
Zoning Districts, Use Table, Supplemental Use Standards and Site Design
Standards. Summary materials will be provided by the end of July so that work
can be reviewed at the August 5 Meeting .
7. As there was no other business coming before the Commission, Motion to
adjourn was made by Tumbleson, seconded by Capes. All in favor; Motion
carried.
Respectfully submitted,
Sarah Delaney
Plan & Review Commission Chair
July 7, 2026
Town of Spider Lake
Zoning Report
July 2026
Date Permit# Name Address Descrip1on Construc1on
Cost
Total
Sq Ft
Fee
7/1 Tiffany Appraiser nonconforming structure inquiry
7/1,6,21,22,30 Kenney LUP inquiry, meeAng, applicaAon review
7/6,7,15 Alcoe Site Visit: 9623W Brandt Rd, TID 30480
7/6 Donnellan Realtor inquiry 8182W Nowak Rd
7/6 Madalon,
Marty,
Morelock,
Romaschko
LUP 26-20,18,25,21 follow ups
7/7 Boehme TID 30275, tree clearing inquiry
7/8,27 Fogel 9623W Brandt Rd driveway request
7/8,27 Boss Contacted re Frick follow up inquiry
7/8,9 Herbert TID 31097 soil erosion inquiry
7/9 Pobloske Driveway Permit applicaAons (4) referred
to Fogel
7/13 Berens Contractor LUP inquiry
7/14,21 Ludewig True North Solar 11202W Murphy Blvd
inquiry
7/14 Guzzo Received LUP applicaAon - review
7/14 Hanson Ghost Lake Dam lease inquiry
7/15 Hannula LUP 26-18 follow up
7/15 Larson Reimbursement status request
7/16 Vervelde Received LUP dra_ for review
7/16 Oa LUP inquiry TID 44058
7/17 Wollner LUP inquiry – Red Deer Condos, accessory
structure
7/20 Yoder Vervelde applicaAon follow up
7/20 Domovek CitaAon status inquiry
7/20 Junger Pre purchase inquiry 11756 Paddock Rd
7/21 Heuster Light issues report, Hanna bay
7/21 Cooper 81822W Nowak Rd inquiry
7/22,23 Kamps 8182 Nowak Rd inquiry
7/22 Schroeder LUP inquiry
7/25 Liddicot Boundary encroachment issues, TID 31197
7/27 Kostroski 2024 LUP inquiry, Nelson
7/27 Sperl 8182 Nowak Rd inquiry
7/29 Hinske 9407W Deer Path Rd LUP inquiry
7/29 Goold CSM follow up
7/29 Timler Subdividing requirement inquiry
7/29 Scrivner LUP review, Hill ConstrucAon contacts
7/31 Clamer CSM inquiry response
7/31 LaBree 8359W Hwy 77 pre purchase inquiry
ExpirationDate________________
Page 1 of 2
TOWN OF SPIDER LAKE
Permit for
Access Driveway to Town Road
Owner Name of Road
Mailing Address Number and Type of Driveways
City, State, Zip Anticipated Completion Date
Daytime Phone Proposed Land Use
Location of Driveway
______ ¼ _______ ¼ of Section __________, T____________N, R __________E (or) W
_______________________________________________________________________
Location and direction from nearest intersection
Required Drainage Structure If No Drainage Structure, State why
CONSTRUCTION MAY NOT BEGIN UNTIL THE PERMIT IS ISSUED.
Detailed Drawing of Proposed Work (include special restrictions, intersection clearances, distance to nearest intersecting road,
distance to other driveways, other details and reference to any sketches which may be attached)
Any driveways shall be constructed in accordance with all requirem ents printed on the reverse and any special conditions stated
herein. The maintenance of the driveways shall be the responsibility of the applicant.
Issuance of this permit shall not be construed as a waiver of the applicant ’s obligation to comply with any more restrictive requirements
imposed by local ordinances.
_______________________________________ ___________________
Signature of applicant Date
OFFICE USE ONLY
Approval Conditions ______________________________________________________________________________________
_______________________________________________________________________________________________________
Permit issued by__________________________ Date______________ Fee $___________________ Check #______________
_____________________________
Signature of Zoning Administrator
Fee: $150.00
Checks should be made payable to:
Treasurer, Town of Spider Lake
10896 W Town Hall Rd
Hayward, WI 54843
Stake or mark location of driveway.
Zoning administrator will not make
an inspection until location(s) are
staked or marked.
Application No.____________________
DW 26-01
See attached.
Lot 1
ExpirationDate________________
Page 1 of 2
TOWN OF SPIDER LAKE
Permit for
Access Driveway to Town Road
Owner Name of Road
Mailing Address Number and Type of Driveways
City, State, Zip Anticipated Completion Date
Daytime Phone Proposed Land Use
Location of Driveway
______ ¼ _______ ¼ of Section __________, T____________N, R __________E (or) W
_______________________________________________________________________
Location and direction from nearest intersection
Required Drainage Structure If No Drainage Structure, State why
CONSTRUCTION MAY NOT BEGIN UNTIL THE PERMIT IS ISSUED.
Detailed Drawing of Proposed Work (include special restrictions, intersection clearances, distance to nearest intersecting road,
distance to other driveways, other details and reference to any sketches which may be attached)
Any driveways shall be constructed in accordance with all requirem ents printed on the reverse and any special conditions stated
herein. The maintenance of the driveways shall be the responsibility of the applicant.
Issuance of this permit shall not be construed as a waiver of the applicant ’s obligation to comply with any more restrictive requirements
imposed by local ordinances.
_______________________________________ ___________________
Signature of applicant Date
OFFICE USE ONLY
Approval Conditions ______________________________________________________________________________________
_______________________________________________________________________________________________________
Permit issued by__________________________ Date______________ Fee $___________________ Check #______________
_____________________________
Signature of Zoning Administrator
Fee: $150.00
Checks should be made payable to:
Treasurer, Town of Spider Lake
10896 W Town Hall Rd
Hayward, WI 54843
Stake or mark location of driveway.
Zoning administrator will not make
an inspection until location(s) are
staked or marked.
Application No.____________________
DW 26-02
See attached.
Lot 2
ExpirationDate________________
Page 1 of 2
TOWN OF SPIDER LAKE
Permit for
Access Driveway to Town Road
Owner Name of Road
Mailing Address Number and Type of Driveways
City, State, Zip Anticipated Completion Date
Daytime Phone Proposed Land Use
Location of Driveway
______ ¼ _______ ¼ of Section __________, T____________N, R __________E (or) W
_______________________________________________________________________
Location and direction from nearest intersection
Required Drainage Structure If No Drainage Structure, State why
CONSTRUCTION MAY NOT BEGIN UNTIL THE PERMIT IS ISSUED.
Detailed Drawing of Proposed Work (include special restrictions, intersection clearances, distance to nearest intersecting road,
distance to other driveways, other details and reference to any sketches which may be attached)
Any driveways shall be constructed in accordance with all requirem ents printed on the reverse and any special conditions stated
herein. The maintenance of the driveways shall be the responsibility of the applicant.
Issuance of this permit shall not be construed as a waiver of the applicant ’s obligation to comply with any more restrictive requirements
imposed by local ordinances.
_______________________________________ ___________________
Signature of applicant Date
OFFICE USE ONLY
Approval Conditions ______________________________________________________________________________________
_______________________________________________________________________________________________________
Permit issued by__________________________ Date______________ Fee $___________________ Check #______________
_____________________________
Signature of Zoning Administrator
Fee: $150.00
Checks should be made payable to:
Treasurer, Town of Spider Lake
10896 W Town Hall Rd
Hayward, WI 54843
Stake or mark location of driveway.
Zoning administrator will not make
an inspection until location(s) are
staked or marked.
Application No.____________________
DW 26-03
See attached.
Lot 3
ExpirationDate________________
Page 1 of 2
TOWN OF SPIDER LAKE
Permit for
Access Driveway to Town Road
Owner Name of Road
Mailing Address Number and Type of Driveways
City, State, Zip Anticipated Completion Date
Daytime Phone Proposed Land Use
Location of Driveway
______ ¼ _______ ¼ of Section __________, T____________N, R __________E (or) W
_______________________________________________________________________
Location and direction from nearest intersection
Required Drainage Structure If No Drainage Structure, State why
CONSTRUCTION MAY NOT BEGIN UNTIL THE PERMIT IS ISSUED.
Detailed Drawing of Proposed Work (include special restrictions, intersection clearances, distance to nearest intersecting road,
distance to other driveways, other details and reference to any sketches which may be attached)
Any driveways shall be constructed in accordance with all requirem ents printed on the reverse and any special conditions stated
herein. The maintenance of the driveways shall be the responsibility of the applicant.
Issuance of this permit shall not be construed as a waiver of the applicant ’s obligation to comply with any more restrictive requirements
imposed by local ordinances.
_______________________________________ ___________________
Signature of applicant Date
OFFICE USE ONLY
Approval Conditions ______________________________________________________________________________________
_______________________________________________________________________________________________________
Permit issued by__________________________ Date______________ Fee $___________________ Check #______________
_____________________________
Signature of Zoning Administrator
Fee: $150.00
Checks should be made payable to:
Treasurer, Town of Spider Lake
10896 W Town Hall Rd
Hayward, WI 54843
Stake or mark location of driveway.
Zoning administrator will not make
an inspection until location(s) are
staked or marked.
Application No.____________________
DW 26-04
See attached.
Lot 4
LUP 26-26
DM 26-03
LUP 26-27
Application for Land Use/Building Permit Town of Spider Lake
Sawyer County, Wisconsin
CONSTRUCTION MAY NOT BEGIN UNTIL THE PERMIT IS ISSUED AND A PERMIT CARD POSTED AT THE PROPERTY
ENTRANCE.
Be sure to complete all steps in this application.
Click Skip or Continue to save your input.
To exit the application at any point, close the app or browser after saving.
Is agent/builder same as owner? Yes No
First name
Brad & Rachel
Last name
Scrivner
Property Owner Daytime Phone #
608 3383775
Property Owner Mailing Address
205 Glenview Rd, Mt Horeb, WI 53572
First name
Carrie
Last name
Bender
Agent/Builder Daytime Phone #
715 6380849
Agent/Builder Mailing Address
15988 US Hwy 63, Hayward, WI 54843
Govʼt Lot
1
1/4 1/4
Sec.
33
Twn.
42N
R______W
06W
Alternate/Legacy ID
028642335109
Description
PRT GOVT LOT 1, LOT 4 CSM 9/56, #1851
Site Address
8784W Elephant Rock Rd, Hayward, WI 54843
Acreage
1.99
Deed
Document #
443076
Sanitary Permit #
665683
Sanitary Permit Date
3/13/2026
Sanitary Permit Issued By
Sawyer County
Year Installed
2026
Owner When Installed
Brad & Rachel Scrivner
Attach Copy Of Approved Sawyer County Sanitary Permit
scrivner-san-2026024
1785347954610.pdf
Visit heygov.co/townofspiderlake.com/fr_01kyqg2jbt3ac6fqdvwh8zp8ft to view or download full files.
Zone District R1 RR1 RR2 A1 C1 I1 F1
Wetland/Shoreland Yes No
Shoreland: The area of frontage on navigable waters measured from the normal high-water elevation within one thousand 1,000
feet from lakes, ponds and flowages; and three hundred 300 feet from rivers and streams.
To Download the Power of Attorney Form open this link here.
Please upload filled in and notarized Power of Attorney
scrivner-power-of-attorney-
1785347982899.pdf
Visit heygov.co/townofspiderlake.com/fr_01kyqg2jbt3ac6fqdvwh8zp8ft to view or download full files.
Throughout the process the inputed information is automatically saved as a
Draft document and you can always revisit it to continue where you left off.
Permit
Requested
For
New Dwelling Addition To Dwelling Accessory Structure
Addition To Accessory Structure Other/Misc Use of Land
Home Occupation/ Professional Office Alternative or Renewable Energy Systems
Communication Systems Other New Building/Structure (e.g., Commercial, Industrial, Agricultural)
Other New Addition To Building/Structure (e.g., Commercial, Industrial, Agricultural)
Other/ Misc info
Other
/ Misc
type
Foundation Replacement
Roof Structure Replacement
Other
Stairs/Walkways Within 75ʼ Of OHWM
Area Involved (length X width = total SQFT
69 sf
Height of Structure Grade to Peak
4
Construction Cost
$7000
Submit Completed Application And Fee To:
Clerk, Town of Spider Lake
Attn: Sarah Delaney
Chair PRC
10896 Town Hall Rd.
Hayward, WI 548543
Skip if project is not Shoreland/Wetland
To take a look at any Additional Information, the Worksheet & the Example Plot
Plan open this link here.
To Download the Shoreland Preservation Agreement open this link here.
Total land area within 300ʼ of the water body:
67256
Please Upload the SHORELAND PRESERVATION A GREEMENT
scrivner-intact-shoreland-signed-
1785349019538.pdf
Visit heygov.co/townofspiderlake.com/fr_01kyqg2jbt3ac6fqdvwh8zp8ft to view or download full files.
Total impervious surface area (including this project)
2011
Please Upload the the worksheet in the Additional Information Worksheet document
scrivner-impervious-worksheet-stairs-
1785351653308.pdf
Visit heygov.co/townofspiderlake.com/fr_01kyqg2jbt3ac6fqdvwh8zp8ft to view or download full files.
B/A x 100 = % Used
2.99%
Attach the Site Plan
stair-lup-layout-1785355501569.pdf scrivner-lake-stairs-1785355557771.pdf
Visit heygov.co/townofspiderlake.com/fr_01kyqg2jbt3ac6fqdvwh8zp8ft to view or download full files.
In the event this application is approved by the Zoning Office, I agree:
That no work shall commence until I have received the issued Land Use Permit, and the Permit Card is posted
That all work shall be done in accordance with the requirements of the Town of Spider Lake Land Use Permit, the Town of
Spider Lake Land Use Ordinance, all other applicable County Ordinances and the laws and regulations of the State of
Wisconsin,
That the signing of this application grants permission to allow free and unlimited access to the property for onsite inspections
between the hours of 800 AM 600 PM Mon – Fri to the Zoning Administrator(s) and/or Plan & Review Commissioners.
I (we) declare that this application (including any accompanying information) has been examined be me (us) and to the best of my
(our) knowledge and belief it is true, correct and complete. I (we) acknowledge that I (we) am (are) responsible for the detail and
accuracy of all information I (we) am (are) providing and that it will be relied upon by the Town of Spider Lake in determining
whether to issue a permit. I (we) further accept liability which may result of the Town of Spider Lake relying on this information I
(we) am (are) providing in or with this application.
Signature of Owner or Agent with Power of Attorney)
Signed electronically on 7/29/26, 315 PM
To Review the Fee Schedule for the Land Use Application open this link here.
Enter amount of calculated fees
200
Thank you for calculating your payment fees. The Zoning Administrator will review the calculations and will send you a request for
payment.
SUBMITED ON 7/29/26
For Zoning & Building Department use only
Does the Plan & Review Commission recommend approval from the Town Board? Yes No
Reason for recommendation
DN
4'
6'
14'-2"
3'-4" 6'-2" 4'-9"
3'
10'
10'-9"
18'-2"
P-1
REVISION TABLE
NUMBER DATE REVISED BY DESCRIPTION
SHEET:
SCALE:
DRAWINGS PROVIDED BY:
DATE:
7/27/2026
Scrivner Lake Stairs
STAIRS HAVE A 7" RISE
AND A 10" STEP
LUP 26-30
Memorandum
To: Town of Spider Lake, Plan and Review Commission
From: Thor Jeppson
Date: July 29, 2026
Re: Land Use Ordinance Update – Summary of Phase I Revisions
Purpose and Scope
This memorandum summarizes the changes proposed to date for Part I of the Town of Spider
Lake Land Use Ordinance. It is intended as a status overview for the Plan and Review
Commission, not as a line-by-line redline. Nothing described below is final and each item
remains subject to Commission direction and, ultimately, to action by the Town Board.
Statutory Framework
The Town zones under Wis. Stat. § 60.62, which authorizes a town exercising village powers
under Wis. Stat. § 60.22(3) to adopt zoning regulations subject to the substantive requirements
of Wis. Stat. § 62.23(7). Two features of that framework shape much of the draft.
Consistency with the comprehensive plan. Wis. Stat. § 66.1001(3) requires that a zoning
ordinance enacted under § 60.62 be consistent with the Town’s adopted comprehensive plan.
Limits on local authority. Several statutes enacted since the current ordinance was written
now constrain what the Town may regulate and how it must decide applications. Several
provisions of the current ordinance are unenforceable under those statutes, and these have
been corrected.
Phase 1 — Part I, Land Use
Reorganization
Part I has been restructured to proceed generally from administrative procedures, to zoning
districts, to use regulations, to dimensional and development standards, and finally to other
development regulations.
The current ordinance frequently shifts between administrative procedures, use regulations,
development standards, and other topics, making it difficult to determine what is allowed on a
property and which standards apply. The proposed reorganization creates a more logical, user-
friendly document that is easier for property owners to navigate and for the Town to administer
and maintain, without changing the ordinance's substantive policies.
Current Organization Proposed Organization
1. Introduction
2. Definitions
3. Zoning Districts
4. Regulations
5. Signs
6. Regulation of Special Uses
7. Screening and Fencing
8. Conditional Uses
9. Administrative
10. Nonconforming Uses
11. Zoning Board of Appeals
12. Amendments
13. Public Hearing / Notices
14. Severability
15. Zone Districts
16. Dimensional Requirements
1. Introduction
2. Definitions
3. Administration and Procedures
4. Zoning Districts
5. Use Regulations
6. Dimensional and Development
Standards
7. Parking, Loading, and Access
8. Landscaping and Screening
9. Outdoor Lighting
10. General Performance Standards
11. Supplemental Use Regulations
12. Signs
13. Conditional Uses
14. Nonconforming Uses
Section 4.0 — Zoning Districts
The draft reduces the number of base districts, refines the statement of purpose and intent for
each district, and moves wetland regulation from a base district to an overlay.
Current District Proposed District
R-1 Residential One Eliminated — no mapped parcels
RR-1 Residential/Recreational
One
RR-1 Rural Residential (renamed)
RR-2 Residential/Recreational
Two
RR-2 Residential/Recreational Two (unchanged)
A-1 Agricultural A-1 Agricultural (unchanged)
C-1 Commercial C-1 Commercial (unchanged)
I-1 Industrial Eliminated — no mapped parcels
F-1 Forestry F-1 Forestry (unchanged)
W-1 Wetland/Shoreland One Eliminated as a base district
SP-1 Shoreland Protection
Overlay
SP-1 Shoreland Protection Overlay (unchanged)
— WO-1 Wetland Overlay (new)
• R-1 Residential One and I-1 Industrial are proposed for elimination. Neither district has
any mapped parcels in the Town, and retaining unmapped districts adds length to the
ordinance without regulatory effect.
• W-1 Wetland/Shoreland One would be eliminated as a base district. Mapped W-1 lands
would be placed in F-1 Forestry, and the wetland standards would be carried forward in a
new Wetland Overlay applied over the underlying base district. Regulating wetlands through
an overlay rather than a base district avoids the mapping problems that arise when a
delineation is revised but keeps the underlying use regulations intact.
• SP-1 Shoreland Protection Overlay is unchanged. County shoreland zoning adopted
under Wis. Stat. § 59.692(1c) and Wis. Admin. Code ch. NR 115 continues to apply
independently within the shoreland area; the Town’s overlay operates on top of the County’s
ordinance where stricter, as permitted by Wis. Stat. § 59.692(2)(bg), subject to the limits in
Wis. Stat. § 60.62(5).
Section 5.0 — Use Regulations
• Converted the narrative lists of permitted and conditional uses into a consolidated Use
Table, with permitted (P), conditional (C), and not permitted designations shown by district.
• Added contemporary use categories that the current ordinance does not address, such as
townhouses, accessory dwelling units, event venues, and data centers, among others, so
that these uses are classified in advance and reviewed against objective standards the
Town has adopted. This matters practically, as a use the ordinance does not identify or
regulate is difficult to condition or deny defensibly.
• Added temporary use standards, and standards governing multiple principal uses on a
single lot.
• Removed condominiums as a land use. A condominium is a form of ownership under Wis.
Stat. ch. 703, and zoning that regulates the ownership form rather than the use is vulnerable
to challenge. The applicable standards have been relocated to Part III, Land Divisions.
Two use classifications warrant specific mention:
• Rooftop solar is classified as a permitted use subject to standards. Wis. Stat. §
66.0401(1m) limits the Town’s authority over solar energy systems to restrictions that
preserve or protect public health or safety, that do not significantly increase the cost of the
system or decrease its efficiency, or that allow for an alternative system of comparable cost
and efficiency.
• Boathouses remain permitted in the RR-1 Rural Residential and RR-2 districts, subject to
the setback standards of the Shoreland Zoning Ordinance. No change to the existing
boathouse standards is proposed.
Section 6.0 — Dimensional and Development Standards
• Simplified the dimensional standards table so that the applicable lot area, width, setback,
and height requirements for each district can be read in one place, but the standards are
unchanged.
• Added a clear definition of building setback to remove ambiguity about the point from which
measurement is taken, together with express exceptions for access features and ordinary
architectural projections such as eaves, gutters, and overhangs.
• Added a limited list of prohibited structures, including shipping containers used as accessory
structures and detached garages or storage buildings exceeding the habitable floor area of
the principal dwelling.
• Added wildfire-resistant roof construction requirements.
• Removed the contiguous substandard lot provision. The Town cannot require lots to be
merged without the owners' consent (Wis. Stat. § 66.10015(4)) or restrict the sale or use of
a substandard lot as a building site if it complies with the Town's other ordinances. The
existing clause is unenforceable. The nonconformity standards in Section 14.0 still apply to
development on these lots.
Section 7.0 — Parking, Loading, and Access
• The existing standards are generally carried forward. They have performed well for the
Town and no structural change is proposed.
• Off-street parking ratios have been expanded to cover additional use categories, and
reduced for two categories in which the current requirement produces more pavement than
demand warrants:
– retail and service uses move from one space per 200 square feet to one space per 300
square feet,
– office and professional uses move from one space per 200 square feet to one space per
400 square feet.
• Access and driveway standards are unchanged.
Section 8.0 — Landscaping and Screening
• Substantially strengthened, with new objective standards governing fence height, materials,
and location, as well as landscaping design and plant selection.
• Added landscaping and screening standards applicable to larger commercial and
institutional development.
• The standards are drafted to be measurable and administratively applied, so that
compliance can be determined at permit review without discretionary judgment.
Section 9.0 — Outdoor Lighting
• The existing standards are strengthened and their scope expanded, including objective light
trespass limits measured at the property line.
• The draft prohibits uplighting and floodlighting, caps correlated color temperature at 3000K,
requires that fixtures provide no more than the minimum intensity necessary for the intended
purpose, and establishes a lighting curfew.
• These provisions respond to the dark-sky and lakeshore character concerns raised during
the planning process, and are written as numerical standards so they can be enforced
consistently.
Section 10.0 — General Performance Standards
• This is a new section establishing objective, measurable standards for recurring nuisance
concerns. The standards apply to all development review.
• The section addresses landscaping, screening, lighting, noise, vibration, dust, fumes and
odors, stormwater, hazardous materials, outdoor storage, refuse and waste disposal, fire
protection and emergency access, drainage, traffic generation, outdoor activities, natural
resource protection, and contaminated soils.
• This section does much of the ordinance's legal work. Under Wis. Stat. § 60.62(4e)(b), any
condition on a conditional use permit must relate to the ordinance's purpose, be reasonable
and measurable where practicable, and rest on substantial evidence.
Section 11.0 — Supplemental Use Regulations
• For uses with a heightened potential for nuisance, or that require regulation beyond the
general standards, the draft adds use-specific supplemental regulations.
• Each supplemental section identifies the additional protections required for that use and,
where appropriate, the circumstances in which the use may deviate from the general
dimensional or performance standards.
• The Town’s existing supplemental regulations, including those for mobile home parks,
campgrounds, kennels, and mineral extraction, are carried forward substantially as written,
with drafting corrections and updated cross-references.
• Other sections are new. Where a use is already subject to state regulation, the
supplemental standards are drafted to the limit of the Town’s remaining authority rather than
restating state law, such as for wind energy systems or mobile service support structures.
• This section is designed to be amended over time as market conditions change and new
concerns arise, without disturbing the structure of the balance of the ordinance.
Section 12.0 — Signs
• Reorganized and simplified for clarity. The substance of the permanent sign regulations is
retained.
• The temporary sign provisions have been rewritten. The current provisions regulate by
message, for example, political signs from real estate signs, which is content-based
regulation. The new provisions are form-based and regulate categories like yard signs and
banners according to size, location, and duration.
• Eliminated the conditional use permit requirement for signs in the Shoreland Protection
Overlay. Signs that satisfy the objective standards are approved administratively, which
removes an unnecessary hearing burden from the Commission and shortens the review
timeline for applicants.
Section 13.0 — Conditional Uses
• The existing structure is retained and conformed to 2017 Wis. Act 67, codified for towns
exercising village powers at Wis. Stat. § 60.62(4e).
• The draft states the substantial evidence standard expressly. Under Wis. Stat. §
60.62(4e)(b)1, the Town must grant a conditional use permit where the applicant meets or
agrees to meet all of the requirements and conditions specified in the ordinance or imposed
by the Town. Any condition imposed must be related to the purpose of the ordinance and
based on substantial evidence, and under § 60.62(4e)(b)2. must be reasonable and, to the
extent practicable, measurable.
• The draft sets out the factors the Commission will consider in reviewing a conditional use.
The purpose is to ensure that the record supporting any approval, denial, or condition is built
against adopted standards rather than developed at the hearing.
Section 14.0 — Nonconformities
• The existing framework is mostly retained. Abandonment and discontinuance provisions are
strengthened. Wis. Stat. § 62.23(7)(h) permits termination of a nonconforming use that has
been discontinued for a period of 12 months, and the draft applies that period while defining
discontinuance in objective terms.
• The registration requirement for nonconforming uses is removed. No statute requires
registration, and the draft instead provides expressly that the burden of establishing a lawful
nonconforming use or structure rests on the property owner.
Source: Town of Spider Lake website. First collected Oct 7, 2026.