CITY OF MAYVILLE PUBLIC WORKS COMMITTEE
MEETING AGENDA
AUGUST 24, 2026
6:00 PM
MAYVILLE CITY HALL
15 S. SCHOOL STREET
1. CALL TO ORDER AND ROLL CALL
2. CITIZEN COMMENTS
Citizen Comments are to be kept to a maximum of five minutes per speaker unless the chairperson
allows an extension of time. Each citizen is to make comments at the podium after stating name and
address. Each citizen may comment only one time per public hearing / meeting.
3. APPROVAL OF MINUTES
3.1. Approval of Minutes of the July 27, 2026, Public Works Committee Meeting
4. DISCUSS WITH POSSIBLE ACTION
4.1. Monthly TAG Center Report to the Public Works Committee
4.2. Monthly Department of Public Works and Parks Department Reports to the Public Works
Committee
4.3. Discussion and Review of 2026 City of Mayville Bridge Inspections, and Possible
Recommendations for Any Needed Repairs
5. ADJOURNMENT
Ald. Anthony DeBaker, Presiding Officer
Meeting to immediately follow the Public Safety Committee meeting.
NOTE: Persons with disabilities requiring special accommodations for attendance at the meeting
should contact City Hall at least one (1) business day prior to the meeting.
Page 1 of 59
CITY OF MAYVILLE PUBLIC WORKS COMMITTEE
MEETING MINUTES
JULY 27, 2026
6:00 PM
MAYVILLE CITY HALL
1. CALL TO ORDER AND ROLL CALL
The meeting was called to order at 07:20 PM by Ald. Tony DeBaker, with the following roll call:
Present: Ald. Tony DeBaker, Ald. Bob Smith, Ald. Kim Olson.
Excused: None
Absent: None
Staff present: DPW/Parks Director Jake Schellpeffer, EMS Director Julie Staffin, EMS Deputy Director
Devin Sellnow, TAG Center Director Jess Loomans, Fire Chief Geoff Engel, Police Chief Ryan Toellner,
Police Lieutenant Jeremy Johnson, Cameron with Elevated Municipal Consulting, and Clerk/Executive
Assistant Anastasia Gonstead.
2. CITIZEN COMMENTS
None.
3. APPROVAL OF MINUTES
3.1. Approval of Minutes of the June 22, 2026, Public Works Committee Meeting
The motion to approve the minutes of the June 22, 2026, Public Works Committee meeting was
made by Ald. Smith and seconded by Ald. DeBaker
Ayes: Ald. DeBaker, Ald. Smith, Ald. Olson
Nays: None
Vote Count: 3 - 0
Motion has Passed
4. DISCUSS WITH POSSIBLE ACTION
4.1. Monthly TAG Center Report to the Public Works Committee
TAG Director Jess Loomans gave her monthly report to the Public Works Committee. She gave an
overview of classes, staffing, and meetings this month. She also provided information on
upcoming events and classes.
4.2. Monthly Department of Public Works and Parks Department Reports to the Public Works
Committee
Page 2 of 59
DPW/Parks Director Jake Schellpeffer gave his monthly report to the Committee. He informed
them that the road construction project should be completed in the next week or two. He gave an
overview of current projects, and the status of the dam projects required by the DNR.
Director Schellpeffer provided an overview of equipment maintenance issues, current DOT testing,
and parks projects and programming. They are exploring contracted services for sidewalk
maintenance. Director Schellpeffer answered questions from the Body. He provided an update on
the archery range, explaining the project should be done and ready at the end of August.
4.3. Discuss, with Possible Recommendation, Introduction of Ordinance 1154-2026, "An Ordinance
Amending §303-7 of the Municipal Code of the City of Mayville, Relating to Public Nuisance
Abatement Procedures"
The motion to recommend Common Council approve the introduction of Ordinance 1154-2026 "An
Ordinance Amending §303-7 of the Municipal Code of the City of Mayville, Relating to Public
Nuisance Abatement Procedures" was made by Ald. Smith and seconded by Ald. DeBaker.
Ayes: Ald. DeBaker, Ald. Smith, Ald. Olson
Nays: None
Vote Count: 3 - 0
Motion has Passed
5. ADJOURNMENT
The motion to adjourn the meeting was made by Ald. Smith and seconded by Ald. Olson.
Ayes: Ald. DeBaker, Ald. Smith, Ald. Olson
Nays: None
Vote Count: 3 - 0
Motion has Passed. The Public Works Committee meeting was adjourned at 7:50 PM.
Respectfully submitted by Lexi Volbright - Deputy Clerk
Page 3 of 59
1B-14-086 19-May-2026 inspection as of 17-Jun-2026
STATE OF WISCONSIN
DEPARTMENT OF TRANSPORTATION
Inspection Report for
B-14-086 ( BRIDGE STREET BRIDGE )
BRIDGE ST over E BR ROCK RIVER
May 19, 2026
Type Prior Date Prior Team Leader Frequency (mos) Performed
Routine 05-23-24 Kassube, Brian (1515) 24 X
SIA review 05-23-24 Kassube, Brian (1515) 48
SNBI 05-23-24 Kassube, Brian (1515) 0 X
UW profile 05-25-22 Kassube, Brian (1515) 96
Start Coordinates End Coordinates (optional)
Latitude 43°29'44.31" N Latitude
Longitude 88°32'36.57" W Longitude
Owner CITY Maintainer CITY
Team members
Time Log Hours
1
Minutes
0
Lauersdorf, Josh: Team Member
Weather Temperature (f)
69
Condition
Overcast
Name Number Signature Signature Date
Inspector
Kassube, Brian
1515
Brian Kassube
06-17-26 E-signed by Brian Kassube(bkassube)
Page 4 of 59
2B-14-086 19-May-2026 inspection as of 17-Jun-2026
BRIDGE INSPECTION REPORT
Wisconsin Department of Transportation
DT2007 2003 s.84.17 Wis. Stats.
page 2
Identification & Location
Feature On:
BRIDGE ST
Section Town Range:
S23 T12N R16E
Structure Number:
B-14-086 Feature Under:
E BR ROCK RIVER
County:
DODGE
Location
0.1M E JCT STH 28
Municipality:
MAYVILLE
Structure Name:
BRIDGE STREET BRIDGE
Geometry Traffic
measurements in feet, except where noted Lanes ADT ADT year Traffic Pattern
Approach Roadway Width:
42
Bridge Roadway Width:
46.0
Total Length:
95.6
On
2
3000
2021
two way traffic
Approach Pavement Width:
42
Deck Width:
58.0
Deck Area (sq ft):
5545
Capacity Load Rating
Inventory rating:
HS18
Overburden depth (in):
2.0
Last rating date:
12-29-09
Controlling:
INTERIOR GIRDER Positive Moment
Operating rating:
HS42
Deck surface material:
Bituminous
Control location:
SPAN 1
Posting:
Emergency Vehicle Weight Limit (tons):
Re-rate for capacity (Y/N):
Re-rate notes:
Hydraulic Classification
Scour Critical Code(113):
Stable- above top footing (8)
Q100 (ft3/sec):
4560
High water elevation (ft):
910.0
Velocity (ft/sec):
5.8
Sufficiency #:
97.7
Field Measured Rail(s)
Rail Location Type Measurement (in)
Primary Rail right outer Other - concrete 49.0
Decorative Rail left outer Tubular type H - aluminum
Decorative Rail right outer Tubular type H - aluminum
Span(s)
Span # Material Configuration Depth (in) Length (ft) Main
Expansion joint(s) Temperature: File:74 New:69
Clearance
Item File Measurement (ft) File Date New Measurement (ft)
Highway min vertical on cardinal
Horizontal on cardinal
Special Components
Component Year Work Performed Note
OVERLAY - PROTECTO WRAP
MEMBRANE
Construction History
Year Work Performed FOS id
1983 New Structure 3812-01-71
1994 Overlay - Bituminous
Page 5 of 59
3B-14-086 19-May-2026 inspection as of 17-Jun-2026
BRIDGE INSPECTION REPORT
Wisconsin Department of Transportation
DT2007 2003 s.84.17 Wis. Stats.
page 3 Structure No.:B-14-086
Maintenance Items
Item Priority Recommended by Status Status change
Substructure - Repair
Abutment/Wings/Culverts
Medium Kassube, Brian (1515) IDENTIFIED 06/03/26
Comment:
Repair top of abutment near NW wing 1'x1' spall.
Status Comment:
Approach - Seal Approach to Paving Block
Medium Kassube, Brian (1515) IDENTIFIED 06/17/26
Comment:
Status Comment:
Misc - Cut Brush
Low Kassube, Brian (1515) IDENTIFIED 06/03/26
Comment:
Cut and remove brush around structure.
Status Comment:
Deck - Seal Surface Cracks
Low Kassube, Brian (1515) IDENTIFIED 06/03/26
Comment:
Status Comment:
Elements
Quantity in Condition State
Chk Element Defect Description UOM Total 1 2 3 4
X 12
Reinforced Concrete Deck - Coated
Reinforcing
SF 5,545 5,350 195 0 0
1130
Cracking (RC) SF 0 195 0 0
3-4 Diagonals in each corner with efflor - 160 SF CS2.
(1) crack at soffit SW.
2 Diagonal CRKS between 5&6 NW (10 SF CS2)
5 Diagonal CRKS between 6&7 NW (25 SF CS2)
8209
Sidewalk SF 970 935 35 0 0
3220
Crack (Wearing Surface) SF 0 15 0 0
(11) CRKS in N sidewalk, mainly near ABUT.
(4) CLRS in S Sidewalk.
8911
Abrasion, Wear, or Rutting (Wear. Surf.) SF 0 20 0 0
Sidewalk approaches are lower than bridge sidewalk
Minor popouts. Small spall at SE.
All 4 sidewalk approaches lower than sidewalk on deck, N.W. & S.W. have asphalt patches in place to correct
the problem20
8512
HMA (AC) Overlay ¿ Polymer Modified SF 5,545 5,545 0 0 0
OK.
X 109
Prestressed Concrete Open Girder LF 643 643 0 0 0
(7) Girders, Good.
X 215
Reinforced Concrete Abutment LF 124 89 30 5 0
Some mortar missing around storm sewer pipe between girders at SE.
1080
Delamination - Spall - Patched Area LF 0 3 0 0
W ABUT: 1' spall w/ map CRKNG at corner w/ SW wing. (1 LF CS2). CS2 1'x1' spall NW corner top of diaph
next to NW wing
E ABUT: Large CRK w/ spall and heavy EFFL/water staining at beam seat of G7 at NE. (1 LF CS3)
1130
Cracking (RC) LF 0 30 5 0
W ABUT: H/L map CRKNG at corner w/ SW wing, bottom and top. (5 LF CS2)
H/L map CRKNG w/ water staining at corner w/ NW wing, bottom and top. (2 LF CS2) Top changed DCM
9/21/16.
VERT CRKS along ABUT. (7 LF CS2).
E ABUT: H/L CRKS at corner w/ N & S wings, bottom and top. (6 LF CS2)
Large VERT CRKS w/ staining and EFFL along ABUT. (5 LF CS3)
VERT CRKS along ABUT. (10LF CS2)
Page 6 of 59
4B-14-086 19-May-2026 inspection as of 17-Jun-2026
BRIDGE INSPECTION REPORT
Wisconsin Department of Transportation
DT2007 2003 s.84.17 Wis. Stats.
page 4 Structure No.:B-14-086
X 330
Metal Bridge Rail LF 236 224 12 0 0
1900
Distortion LF 0 12 0 0
Inlet and outlet top metal rail is dented in numerous areas.
Top of rail has several dent marks S.E. corner (12 CS2)
7000
Damage EA 0 2 0 0
Inlet and outlet top metal rail is dented in numerous areas.
Top of rail has several dent marks S.E. corner (12 CS2)
515
Steel Protective Coating (Other) SF 236 236 0 0 0
Aluminum
X 331
Reinforced Concrete Bridge Rail LF 271 248 13 10 0
Caulk peeling.
1080
Delamination - Spall - Patched Area LF 0 0 10 0
CS1 NW wing small scrape and spall on top 0.25'x0.25' by support. Pop outs throughout.
CS3 NW wing damage top rail and both support posts are bent. 10 LF CS3 (Should be in distortion but cant add
for RC Rail)
1130
Cracking (RC) LF 0 13 0 0
(9) VERT CRKS in N rail. (9 LF CS2) Outlet
(4) VERT CRKS in S rail. (4 LF CS2) Inlet
X 8400
Integral Wingwall EA 4 0 3 1 0
8903
Wall Deterioration EA 0 3 1 0
NE Wing: (2) VERT CRKS & H/L map CRKNG near end. (CS2)
NW Wing: H/L map CRKNG at connection to W ABUT. (CS2)
SW Wing: H/L map CRKNG at connection to W ABUT. and Spall CS3
SE Wing: CRKS w/ EFFL. (CS2)
Page 7 of 59
5B-14-086 19-May-2026 inspection as of 17-Jun-2026
BRIDGE INSPECTION REPORT
Wisconsin Department of Transportation
DT2007 2003 s.84.17 Wis. Stats.
page 5 Structure No.:B-14-086
Assessments
Quantity in Condition State
Chk Element Defect Description UOM Total 1 2 3 4
X 9001
Drainage - Ends of Structure EA 4 2 2 0 0
Curb and gutter at all corners. Settlement at abutments east causing duck ponds.
X 9011
Utilities EA 1 1 0 0 0
Bays 2,3&5. Minor damage to insulation.
X 9168
Concrete Diaphragm EA 12 12 0 0 0
Good.
X 9323
Approach Roadway - Asphalt EA 2 2 0 0 0
Good.
Condition Ratings
File New
Deck condition rating (C.01) Satisfactory (6) Satisfactory (6)
Superstructure condition rating (C.02) Very Good (8) Very Good (8)
Substructure condition rating (C.03) Satisfactory (6) Satisfactory (6)
Culvert condition rating (C.04) N/A (Nbi) (N) N/A (Nbi) (N)
Bridge railings condition rating (C.05) Satisfactory (6) Satisfactory (6)
Bridge railing transitions condition rating (C.06) Very Good (8) N/A (N)
Bridge bearings condition rating (C.07) N/A (N) N/A (N)
Bridge joints condition rating (C.08) N/A (N) N/A (N)
Channel condition rating (C.09) Very Good (8) Very Good (8)
Channel protection condition rating (C.10) Very Good (8) Very Good (8)
Scour condition rating (C.11) Some Minor (7) Some Minor (7)
Channel Protected (8) Protected (8)
Waterway Equal Desirable (8) Equal Desirable (8)
Approach Good- No speed reduction (8)
Structure Specific Notes
Animal nesting/roosting presence on structure
X Swallows
Inspection Specific Notes
Notifed city sewer dept. of water leaking on NW. abut. BDK 5-27-14
Inspector Site-Specific Safety Considerations
Routine Specific Procedures
Special Requirements
Chk Hours Cost Comments
Other Access
Equipment Boat / Kayak
Page 8 of 59
6B-14-086 19-May-2026 inspection as of 17-Jun-2026
page 6 Structure No.:B-14-086
Underwater Probe Form
B-14-086
General Site Conditions - Scour
General Site Conditions - Embankment Erosion/Conditions
Substructure Notes
Chk Unit Max Water Depth(ft) Mode Channel Material Notes
X Cardinal 4.0 Boat East
X Non Cardinal 4.4 Boat West
Page 9 of 59
7B-14-086 19-May-2026 inspection as of 17-Jun-2026
page 7 Structure No.:B-14-086
Routine Item 1
Cracking & leaking E. abut.
b14-086_26_Rd1.jpg
Linked Element(s):
Reinforced concrete abutment
Routine Item 2
Underside cracking E.
b14-086_26_Rd2.jpg
Linked Element(s):
Reinforced concrete deck coated reinforcing
Routine Item 3
Asphalt repair
b14-086_26_Rd3.jpg
Routine Item 4
Impact to rail
b14-086_26_Rd4.jpg
Page 10 of 59
8B-14-086 19-May-2026 inspection as of 17-Jun-2026
Linked Element(s):
Reinforced concrete bridge rail
Routine Item 5
Bent support
b14-086_26_Rd5.jpg
Linked Element(s):
Reinforced concrete bridge rail
Routine Item 6
Cracking S.E. corner
b14-086_26_Rd6.jpg
Linked Element(s):
Reinforced concrete abutment
Integral wingwall
Routine Item 7
Spall S.W. corner
b14-086_26_Rd7.jpg
Linked Element(s):
Reinforced concrete abutment
Page 11 of 59
9B-14-086 19-May-2026 inspection as of 17-Jun-2026
page 9 Structure No.:B-14-086
Routine Item 8
2024 Cracking in SE abut
b14-086_26_Rd8.jpg
Linked Element(s):
Reinforced concrete abutment
Routine Item 9
Spall SW corner
b14-086_26_Rd9.jpg
Linked Element(s):
Reinforced concrete abutment
Integral wingwall
Routine Item 10
Rust staining W
b14-086_26_Rd10.jpg
Linked Element(s):
Reinforced concrete abutment
Page 12 of 59
10B-14-086 19-May-2026 inspection as of 17-Jun-2026
page 10 Structure No.:B-14-086
Routine Item 11
NE corner
b14-086_26_Rd11.jpg
Linked Element(s):
Reinforced concrete deck coated reinforcing
Reinforced concrete abutment
Routine Item 12
NE corner
b14-086_26_Rd12.jpg
Linked Element(s):
Reinforced concrete abutment
Routine Item 13
SE corner
b14-086_26_Rd13.jpg
Linked Element(s):
Metal bridge rail
Reinforced concrete deck coated reinforcing -> Sidewalk
Page 13 of 59
11B-14-086 19-May-2026 inspection as of 17-Jun-2026
page 11 Structure No.:B-14-086
Routine Item 14
Dented top rail
b14-086_26_Rd14.jpg
Linked Element(s):
Metal bridge rail
Routine Item 15
E side
b14-086_26_Rd15.jpg
Linked Element(s):
Reinforced concrete deck coated reinforcing -> Sidewalk
Reinforced concrete deck coated reinforcing -> HMA a c overlay ¿ polymer modified
Routine Item 16
NW corner
b14-086_26_Rd16.jpg
Linked Element(s):
Reinforced concrete bridge rail
Reinforced concrete deck coated reinforcing -> Sidewalk
Page 14 of 59
12B-14-086 19-May-2026 inspection as of 17-Jun-2026
page 12 Structure No.:B-14-086
Routine Item 17
2026
Unsealed approach joint
b14-086_26_Rd17.jpg
Linked Element(s):
Approach roadway asphalt
Routine Item 18
Damage to rail post outlet west end
b14-086_26_Rd18.jpg
Linked Element(s):
Metal bridge rail
Reinforced concrete bridge rail
Routine Item 19
Cracking in S.E. corner abutment
b14-086_26_Rd19.jpg
Linked Element(s):
Reinforced concrete abutment
Page 15 of 59
13B-14-086 19-May-2026 inspection as of 17-Jun-2026
page 13 Structure No.:B-14-086
Routine Item 20
Inlet west side spalls
b14-086_26_Rd20.jpg
Linked Element(s):
Reinforced concrete abutment
Integral wingwall
Routine Item 21
Settlement of sidewalk inlet facing east
b14-086_26_Rd21.jpg
Linked Element(s):
Reinforced concrete deck coated reinforcing -> Sidewalk
Routine Item 22
Settlement of sidewalk to bridge outlet facing east
b14-086_26_Rd22.jpg
Linked Element(s):
Reinforced concrete deck coated reinforcing -> Sidewalk
Page 16 of 59
14B-14-086 19-May-2026 inspection as of 17-Jun-2026
page 14 Structure No.:B-14-086
Routine Item 23
Damage to rail
b14-086_26_Rd23.jpg
Linked Element(s):
Metal bridge rail
Routine Item 24
Cracking with effloresces @ East abutment
b14-086_26_Rd24.jpg
Linked Element(s):
Reinforced concrete deck coated reinforcing
Routine Item 25
Spall / Rebar exposed east abutment
b14-086_26_Rd25.jpg
Linked Element(s):
Reinforced concrete abutment
Page 17 of 59
15B-14-086 19-May-2026 inspection as of 17-Jun-2026
page 15 Structure No.:B-14-086
Routine Item 26
Crack / Rust staining west abutment
b14-086_26_Rd26.jpg
Page 18 of 59
16B-14-086 19-May-2026 inspection as of 17-Jun-2026
Specifications for National Bridge Inventory (SNBI) Data items
B-14-086
Span Material and Type (B.SP)
Span 1
(main)
Number Beam Lines:
7
Wearing surface:
Bituminous (asphalt) (B01)
Span Material:
Prestressed concrete - pre-tensioned (C03)
Deck Protective system:
None (0)
Span Protective System:
Unknown (U)
Deck reinforcing protective system:
Coating - epoxy coated (C01)
Deck Material and Type:
Reinforced concrete - cast-in-place (C01)
Deck Stay In Place Forms:
None (0)
Substructure Material and Type (B.SB)
Non Cardinal
Abutment
Substructure material:
Reinforced concrete - cast-in-place (C01)
Foundation protective system:
None (0)
Substructure protective system:
None (0)
Cardinal
Abutment
Substructure material:
Reinforced concrete - cast-in-place (C01)
Foundation protective system:
None (0)
Substructure protective system:
None (0)
Geometry (B.G)
NBIS bridge length:
92.4
Curved bridge:
Not curved (N)
Maximum bridge height:
12
Inspection Requirements (B.IR)
NSTM Inspection Required:
No (N)
E or E' fatigue Details:
Appraisal (B.AP)
Approach roadway alignment:
Good (G)
Overtopping likelihood:
Never (0)
Page 19 of 59
Page 20 of 59
Page 21 of 59
Page 22 of 59
Page 23 of 59
Page 24 of 59
Page 25 of 59
Page 26 of 59
Page 27 of 59
Page 28 of 59
Page 29 of 59
Page 30 of 59
Page 31 of 59
Page 32 of 59
Page 33 of 59
Page 34 of 59
Page 35 of 59
1B-14-031 19-May-2026 inspection as of 22-Jun-2026
STATE OF WISCONSIN
DEPARTMENT OF TRANSPORTATION
Inspection Report for
B-14-031 ( GOLF COURSE )
GERMAN ST over ROCK RIVER
May 19, 2026
Type Prior Date Prior Team Leader Frequency (mos) Performed
Routine 05-23-24 Kassube, Brian (1515) 24 X
Special 05-20-13 Kassube, Brian (1515) 0
SIA review 05-23-24 Kassube, Brian (1515) 48
SNBI 05-23-24 Kassube, Brian (1515) 0 X
UW profile 05-24-22 Kassube, Brian (1515) 96
Start Coordinates End Coordinates (optional)
Latitude 43°29'36.84" N Latitude
Longitude 88°31'52.91" W Longitude
Owner CITY Maintainer CITY
Team members
Time Log Hours
1
Minutes
0
Lauersdorf, Josh: Team Member
Weather Temperature (f)
70
Condition
Overcast
Name Number Signature Signature Date
Inspector
Kassube, Brian
1515
Brian Kassube
06-22-26 E-signed by Brian Kassube(bkassube)
Page 36 of 59
2B-14-031 19-May-2026 inspection as of 22-Jun-2026
BRIDGE INSPECTION REPORT
Wisconsin Department of Transportation
DT2007 2003 s.84.17 Wis. Stats.
page 2
Identification & Location
Feature On:
GERMAN ST
Section Town Range:
S24 T12N R16E
Structure Number:
B-14-031 Feature Under:
ROCK RIVER
County:
DODGE
Location
0.9M E JCT STH 28
Municipality:
MAYVILLE
Structure Name:
GOLF COURSE
Geometry Traffic
measurements in feet, except where noted Lanes ADT ADT year Traffic Pattern
Approach Roadway Width:
32
Bridge Roadway Width:
24.0
Total Length:
135.3
On
2
834
2015
two way traffic
Approach Pavement Width:
22
Deck Width:
31.0
Deck Area (sq ft):
4194
Capacity Load Rating
Inventory rating:
HS14
Overburden depth (in):
0.0
Last rating date:
06-03-23
Controlling:
EXTERIOR GIRDER Positive Moment
Operating rating:
HS24
Deck surface material:
Concrete
Control location:
2 - (50.0)
Posting:
Emergency Vehicle Weight Limit (tons):
Re-rate for capacity (Y/N):
Re-rate notes:
Hydraulic Classification
Scour Critical Code(113):
Stable- above top footing (8)
Q100 (ft3/sec):
0
High water elevation (ft):
0.0
Velocity (ft/sec):
0.0
Sufficiency #:
58.0
Field Measured Rail(s)
Rail Location Type Measurement (in)
Primary Rail left outer Tubular steel type F (2 tube) 34.0
Primary Rail right outer Tubular steel type F (3 tube) 49.0
Span(s)
Span # Material Configuration Depth (in) Length (ft) Main
1 CONT STEEL Girder/Beam - I-Shaped Spread 40.0
2 CONT STEEL Girder/Beam - I-Shaped Spread 50.0 Y
3 CONT STEEL Girder/Beam - I-Shaped Spread 40.0
Expansion joint(s) Temperature: File:76 New:70
Joint # Location Type Last inspection date Last measure (in) New measure (in)
1 EAST ABUTMENT WA-200
2 WEST ABUTMENT WA-400
Clearance
Item File Measurement (ft) File Date New Measurement (ft)
Highway min vertical on cardinal
Horizontal on cardinal
Special Components
Component Year Work Performed Note
DECK SEALER - XYPEX
Page 37 of 59
3B-14-031 19-May-2026 inspection as of 22-Jun-2026
BRIDGE INSPECTION REPORT
Wisconsin Department of Transportation
DT2007 2003 s.84.17 Wis. Stats.
page 3 Structure No.:B-14-031
Construction History
Year Work Performed FOS id
1987 New Deck 3812-03-71
1960 New Structure
1994 Seal Deck - Concrete
Maintenance Items
Item Priority Recommended by Status Status change
Substructure - Clean Abutment / Pier Seats
High Kassube, Brian (1515) IDENTIFIED 06/03/26
Comment:
Around all bearings both abutments
Status Comment:
Deck - Seal Surface Cracks
Medium Kassube, Brian (1515) IDENTIFIED 06/03/26
Comment:
Status Comment:
Approach - Repair Approaches
Medium Kassube, Brian (1515) IDENTIFIED 06/03/26
Comment:
Status Comment:
Misc - Cut Brush
Medium Kassube, Brian (1515) IDENTIFIED 06/03/26
Comment:
Status Comment:
Expansion Joints - Clean
Medium Kassube, Brian (1515) IDENTIFIED 06/03/26
Comment:
Remove debris in joint
Status Comment:
Deck - Clean and Sweep Deck/Drains
Medium Kassube, Brian (1515) IDENTIFIED 06/03/26
Comment:
Status Comment:
Page 38 of 59
4B-14-031 19-May-2026 inspection as of 22-Jun-2026
BRIDGE INSPECTION REPORT
Wisconsin Department of Transportation
DT2007 2003 s.84.17 Wis. Stats.
page 4 Structure No.:B-14-031
Elements
Quantity in Condition State
Chk Element Defect Description UOM Total 1 2 3 4
X 12
Reinforced Concrete Deck - Coated
Reinforcing
SF 4,194 3,664 399 131 0
1080
Delamination - Spall - Patched Area SF 0 61 131 0
Span 1 (W span): Deck edge spalling and deteriorated at connection to joint. (31 SF CS3)
2'x2' spall 17' & 21' from W ABUT. (9 SF CS3)
3 SF of delam. (3 SF CS2)
Span 2 (center): 4' and 2' spalls along N side mid span drip groove. (10 SF CS3)
Between all 4 girders (58 SF CS 2)
Span 3 (E span): Deck edge spalling and deteriorated at connection to joint. (31 SF CS3)
2'x1' spall between girders near midspan. (2 SF CS3)
Spalls from E ABUT (2' in 2' lg) (8' in 10' lg) (25' in 8' lg) (42' in 1' lg) on the N side drip edge. (45 SF
CS3)
1130
Cracking (RC) SF 0 341 0 0
(11) H/L CRKS w/ EFFL mid span across all bays. (341 SF CS2)
8904
Discoloration SF 0 0 0 0
Drip edge 2' wide entire length inlet and 1' wide entire length outlet
8000
Wearing Surface (Bare) SF 4,194 3,746 448 0 0
Delamination E. bound
70' from w. appr. 1'x3' CS-2
75' from w. appr. 3'x3' CS-2
Delamination W. bound
29' from e. appr. 2'x2' CS-2
55' from e. appr. 3'x3' CS-2
61' from e. appr. 3'x3' CS-2
80' from e. appr. 2'x2' CS-2
3220
Crack (Wearing Surface) SF 0 448 0 0
Minor spalls and CRKS near joint at W Appr. (10 SF CS2)
Minor spalls and CRKS near joint at E Appr. (10 SF CS2)
(15) H/L CRKS at midspan transverse over piers. (390 SF CS2)
8209
Sidewalk SF 792 642 150 0 0
6'x132'
3210
Debonding/Spall/Patched Area/Pothole SF 0 3 0 0
Spalled by drain on curb edge.
Pop outs thru out
3220
Crack (Wearing Surface) SF 0 15 0 0
Few H/L CRKS. with efflor under.
8911
Abrasion, Wear, or Rutting (Wear. Surf.) SF 0 132 0 0
Plow damage along top edge throughout length of sidewalk
X 107
Steel Open Girder LF 528 300 80 146 2
Outside girder mid span shows slight deflection in girder, on ends by bearings heavy rusting and scaling.
Beams are 5/8 thick
1000
Corrosion LF 0 30 146 2
Pack rust between beams and bearing plate heavy on west end.
Span 1 (W span): Heavy rust w/ section loss on all girders at W ABUT. (12 LF CS3)
Minor rust of top & btm flange with minor section loss of G1 for remainder of span. (37 LF CS3)
Minor rust on G4 in span. (10 LF CS2)
Span 2 (center): Minor rust of top & btm flange with minor section loss of G1 for entire span. (50 LF CS3)
Minor rust on G4 in span. (10 LF CS2, qty under 1900)
Span 3 (E span): Heavy rust w/ section loss on all girders at E ABUT. (12 LF CS3)
Minor rust of top & btm flange with minor section loss of G1 for remainder of span. (37 LF CS3)
Minor rust on G4 in span. (10 LF CS2)
Behind bearing on bottom flange has 2" hole on inside of web outlet and both outside G. bottom flange behind
bearing is 1/8" thick (2 LF CS4) Bottom flange in front of bearing has 1/8 section loss on two outside girders #1
Control thickness of bottom flange : .720
Page 39 of 59
5B-14-031 19-May-2026 inspection as of 22-Jun-2026
#1 G. E. end @ bearing bottom flange : .570
#4 G. E. end @ bearing bottom flange: .512
#3 G. W. end @ bearing bottom flange: .638
1900
Distortion LF 0 50 0 0
Beams 1&4 mid span have lost their camber from inlet end. (G1 in CS3 Corrosion)
8516
Painted Steel SF 3,719 0 3,347 0 372
On all ends by bearings heavy rusting and scaling
3440
Effectiveness (Steel Protective Coatings) SF 0 3,347 0 372
On all ends by bearings heavy rusting and scaling and at top and bottom flange north girders.
W. abut. all 4 G. 1" pack rust between bottom of G. & bearing plate.
X 210
Reinforced Concrete Pier Wall LF 52 52 0 0 0
West pier inlet side several trees in front of pier
X 215
Reinforced Concrete Abutment LF 52 10 37 5 0
varmint infestation E & W ABUT by slope.
1080
Delamination - Spall - Patched Area LF 0 11 5 0
W ABUT: N side of bearing #1 top of ABUT, spall 6"x8"x1-1/2", S side 6"x9"x2-1/2" spall extends under bearing
pad.. #2 bearing North side delam (1' CS2) S side 6"x10"x2" spall. #4 N side 8"x10"x2-1/2" spall extends under
bearing pad 3/4".
Delam at top of on face 10 LF CS2.
1130
Cracking (RC) LF 0 26 0 0
W ABUT: 22' HORIZ CRK w/ DELAM. (22 LF CS2)
E ABUT: H/L CRK w/ EFFL at NE corner and SE corner. (2 LF CS2)
2' HORIZ CRK at beam seat. (2 LF CS2)
X 302
Compression Joint Seal LF 62 0 0 62 0
packed full of sand/gravel.
2310
Leakage, Seal Adhesion, Damage,Cracking LF 0 0 62 0
Seals are leaking
2350
Debris Impaction LF 0 0 0 0
packed full of sand/gravel.
X 310
Elastomeric Bearing EA 12 0 4 4 4
Heavy pack rust is squashing down bearing on all 4 W. abut. Bearings have heavy debris and rust around
them at the W ABUT. and are twisting
1000
Corrosion EA 0 4 4 4
W ABUT: Heavy rust w/ section loss/compression all 4 bearing (4 CS4)
Pier 1: Minor rust at EXT bearings. (2CS2) (2CS3)
Pier 2: Minor rust at EXT bearings. (2 CS2) (2CS3)
2220
Alignment EA 0 0 0 4
W ABUT: Heavy pack rust is squashing down bearing on all 4 G (4 CS4)
X 311
Moveable Bearing EA 4 0 2 0 2
Rusting on outside bearings East.
1000
Corrosion EA 0 2 0 2
Heavy rusting w/ section loss on EXT bearings.
Minor rusting of INT bearings.
X 330
Metal Bridge Rail LF 269 229 40 0 0
F-rail on inlet side has 2 tubes horizontal and outlet side M-rail has 3 tubes horizontally 18 posts 9 on a side
Scrapes on NE corner.
Caulk peeling.
1000
Corrosion LF 0 40 0 0
Bases rusting north, anchor bolts rusting at each.
Page 40 of 59
6B-14-031 19-May-2026 inspection as of 22-Jun-2026
BRIDGE INSPECTION REPORT
Wisconsin Department of Transportation
DT2007 2003 s.84.17 Wis. Stats.
page 6 Structure No.:B-14-031
X 8400
Integral Wingwall EA 4 4 0 0 0
Assessments
Quantity in Condition State
Chk Element Defect Description UOM Total 1 2 3 4
X 9001
Drainage - Ends of Structure EA 4 4 0 0 0
Curb and gutter at corners.
X 9030
Signs - Object Markers EA 4 4 0 0 0
Rusty bolts, SW tipped. NW & SW faded
X 9045
Slope Protection- Riprap EA 2 1 0 1 0
Varmit infestation on both slopes.
X 9167
Steel Diaphragm EA 24 18 0 6 0
Rusting of back (joint) side of end diaphragms at ABUTS due to leaking joints. Other small areas of surface
rust.
X 9323
Approach Roadway - Asphalt EA 2 0 0 0 2
Approaches are breaking up on each end router and rubber, pot hole at SE.
Condition Ratings
File New
Deck condition rating (C.01) Satisfactory (6) Satisfactory (6)
Superstructure condition rating (C.02) Fair (5) Fair (5)
Substructure condition rating (C.03) Fair (5) Fair (5)
Culvert condition rating (C.04) N/A (Nbi) (N) N/A (Nbi) (N)
Bridge railings condition rating (C.05) Satisfactory (6) Satisfactory (6)
Bridge railing transitions condition rating (C.06) N/A (N) N/A (N)
Bridge bearings condition rating (C.07) Poor (4) Poor (4)
Bridge joints condition rating (C.08) Fair (5) Fair (5)
Channel condition rating (C.09) Satisfactory (6) Satisfactory (6)
Channel protection condition rating (C.10) Satisfactory (6) Satisfactory (6)
Scour condition rating (C.11) Some Minor (7) Some Minor (7)
Channel Bank Slumping (6) Bank Slumping (6)
Waterway Equal Desirable (8) Equal Desirable (8)
Approach Good- No speed reduction (8)
Structure Specific Notes
Approach SW slightly undermined. This bridge may be good candidate for rehab including painting girders, joint replacement, and
bearing replacement.
Animal nesting/roosting presence on structure
X Swallows
Inspection Specific Notes
No guardrail on any end of railing.Trees and brush under and corner of bridge need to be cut and removed. Joints need to be blown
out, full of debris.Both joints leaking down on to all girders causing severe rusting and scalling BDK 5-27-14
4-28-14 load posting signs and advanced warning posted signs have been removed due to WIS DOT calculations per section 45.4 of
the Wisconsin Bridge Manual. BDK 5-27-14
Page 41 of 59
7B-14-031 19-May-2026 inspection as of 22-Jun-2026
BRIDGE INSPECTION REPORT
Wisconsin Department of Transportation
DT2007 2003 s.84.17 Wis. Stats.
page 7 Structure No.:B-14-031
Inspector Site-Specific Safety Considerations
Poison Oak present under bridge
Routine Specific Procedures
Special Requirements
Chk Hours Cost Comments
Page 42 of 59
8B-14-031 19-May-2026 inspection as of 22-Jun-2026
page 8 Structure No.:B-14-031
Underwater Probe Form
B-14-031
General Site Conditions - Scour
General Site Conditions - Embankment Erosion/Conditions
Substructure Notes
Chk Unit Max Water Depth(ft) Mode Channel Material Notes
X Cardinal Dry
X Pier 1 6.1 Wade
X Pier 2 5.2 Wade
X Non Cardinal Dry
Page 43 of 59
9B-14-031 19-May-2026 inspection as of 22-Jun-2026
page 9 Structure No.:B-14-031
Routine Item 1
Joint movement
b14-031_26_Rd1.jpg
Linked Element(s):
Compression joint seal
Routine Item 2
Pack rust @ bearing
b14-031_26_Rd2.jpg
Linked Element(s):
Steel open girder
Elastomeric bearing
Routine Item 3
Spalling of drip edge
b14-031_26_Rd3.jpg
Linked Element(s):
Reinforced concrete deck coated reinforcing
Page 44 of 59
10B-14-031 19-May-2026 inspection as of 22-Jun-2026
page 10 Structure No.:B-14-031
Routine Item 4
Under deck spalling
b14-031_26_Rd4.jpg
Linked Element(s):
Reinforced concrete deck coated reinforcing
Routine Item 5
Hole in bottom flange behind bearing
b14-031_26_Rd5.jpg
Linked Element(s):
Steel open girder
Routine Item 6
Spall @ abut.
b14-031_26_Rd6.jpg
Linked Element(s):
Reinforced concrete abutment
Page 45 of 59
11B-14-031 19-May-2026 inspection as of 22-Jun-2026
page 11 Structure No.:B-14-031
Routine Item 7
Rusting @ bearing seat
b14-031_26_Rd7.jpg
Linked Element(s):
Steel open girder
Reinforced concrete abutment
Moveable bearing
Routine Item 8
Expansion joint
b14-031_26_Rd8.jpg
Linked Element(s):
Compression joint seal
Routine Item 9
b14-031_26_Rd9.jpg
Page 46 of 59
12B-14-031 19-May-2026 inspection as of 22-Jun-2026
page 12 Structure No.:B-14-031
Routine Item 10
Spall @ bearing
b14-031_26_Rd10.jpg
Linked Element(s):
Reinforced concrete abutment
Routine Item 11
twisting
b14-031_26_Rd11.jpg
Linked Element(s):
Elastomeric bearing
Routine Item 12
Twisting
b14-031_26_Rd12.jpg
Linked Element(s):
Elastomeric bearing
Page 47 of 59
13B-14-031 19-May-2026 inspection as of 22-Jun-2026
page 13 Structure No.:B-14-031
Routine Item 13
2024 termination end
b14-031_26_Rd13.jpg
Linked Element(s):
Compression joint seal
Metal bridge rail
Approach roadway asphalt
Routine Item 14
Compression of bearing W side #3
b14-031_26_Rd14.jpg
Linked Element(s):
Elastomeric bearing
Routine Item 15
Compression of bearing W side #3
b14-031_26_Rd15.jpg
Linked Element(s):
Elastomeric bearing
Page 48 of 59
14B-14-031 19-May-2026 inspection as of 22-Jun-2026
page 14 Structure No.:B-14-031
Routine Item 16
Pack rust W side #2
b14-031_26_Rd16.jpg
Linked Element(s):
Elastomeric bearing
Steel open girder -> Painted steel
Routine Item 17
Compression of bearing due to pack rust W side #3
b14-031_26_Rd17.jpg
Linked Element(s):
Elastomeric bearing
Routine Item 18
W side #2
b14-031_26_Rd18.jpg
Linked Element(s):
Elastomeric bearing
Page 49 of 59
15B-14-031 19-May-2026 inspection as of 22-Jun-2026
page 15 Structure No.:B-14-031
Routine Item 19
W side #4
b14-031_26_Rd19.jpg
Linked Element(s):
Elastomeric bearing
Routine Item 20
W side #1
b14-031_26_Rd20.jpg
Linked Element(s):
Elastomeric bearing
Steel open girder -> Painted steel
Routine Item 21
Hole in web
b14-031_26_Rd21.jpg
Linked Element(s):
Moveable bearing
Steel open girder -> Painted steel
Page 50 of 59
16B-14-031 19-May-2026 inspection as of 22-Jun-2026
page 16 Structure No.:B-14-031
Routine Item 22
Hole in web/ section loss
b14-031_26_Rd22.jpg
Linked Element(s):
Steel open girder
Steel open girder -> Painted steel
Routine Item 23
E side #1
b14-031_26_Rd23.jpg
Linked Element(s):
Steel open girder -> Painted steel
Routine Item 24
Section loss #1
b14-031_26_Rd24.jpg
Linked Element(s):
Steel open girder -> Painted steel
Page 51 of 59
17B-14-031 19-May-2026 inspection as of 22-Jun-2026
page 17 Structure No.:B-14-031
Routine Item 25
Spall in abut.
b14-031_26_Rd25.jpg
Linked Element(s):
Reinforced concrete abutment
Routine Item 26
Spall Inlet
b14-031_26_Rd26.jpg
Linked Element(s):
Reinforced concrete deck coated reinforcing
Routine Item 27
2026
b14-031_26_Rd27.jpg
Linked Element(s):
Reinforced concrete deck coated reinforcing -> Wearing surface bare
Page 52 of 59
18B-14-031 19-May-2026 inspection as of 22-Jun-2026
page 18 Structure No.:B-14-031
Routine Item 28
Delamination in deck facing east
b14-031_26_Rd28.jpg
Linked Element(s):
Reinforced concrete deck coated reinforcing -> Wearing surface bare
Routine Item 29
Delamination in deck facing south
b14-031_26_Rd29.jpg
Linked Element(s):
Reinforced concrete deck coated reinforcing -> Wearing surface bare
Routine Item 30
Spall east side
b14-031_26_Rd30.jpg
Linked Element(s):
Reinforced concrete abutment
Page 53 of 59
19B-14-031 19-May-2026 inspection as of 22-Jun-2026
page 19 Structure No.:B-14-031
Routine Item 31
Hole in G. @ bearing east side
b14-031_26_Rd31.jpg
Linked Element(s):
Steel open girder -> Painted steel
Routine Item 32
Heavy rusting @ bearing east side #1G.
b14-031_26_Rd32.jpg
Linked Element(s):
Steel open girder
Routine Item 33
Spall rebar exposed inlet
b14-031_26_Rd33.jpg
Linked Element(s):
Reinforced concrete deck coated reinforcing
Page 54 of 59
20B-14-031 19-May-2026 inspection as of 22-Jun-2026
page 20 Structure No.:B-14-031
Routine Item 34
Rusting on steel G. inlet
b14-031_26_Rd34.jpg
Linked Element(s):
Steel open girder -> Painted steel
Routine Item 35
East end
b14-031_26_Rd35.jpg
Linked Element(s):
Approach roadway asphalt
Routine Item 36
b14-031_26_Rd36.jpg
Routine Item 37
Spall around bearing / heavy debris that needs to be removed
Rusting of steel @ bearing
b14-031_26_Rd37.jpg
Linked Element(s):
Page 55 of 59
21B-14-031 19-May-2026 inspection as of 22-Jun-2026
Reinforced concrete abutment
Steel open girder -> Painted steel
Routine Item 38
Pack rust under G. west side
Compression of bearing from pack rust
b14-031_26_Rd38.jpg
Linked Element(s):
Steel open girder
Elastomeric bearing
Routine Item 39
Rusting @ bearing
Cracking in abutment west side
Tipping of bearing
b14-031_26_Rd39.jpg
Linked Element(s):
Reinforced concrete abutment
Moveable bearing
Steel open girder -> Painted steel
Routine Item 40
Rusting of bearing
Spall around bearing
b14-031_26_Rd40.jpg
Linked Element(s):
Reinforced concrete abutment
Elastomeric bearing
Page 56 of 59
22B-14-031 19-May-2026 inspection as of 22-Jun-2026
page 22 Structure No.:B-14-031
Routine Item 41
Cracking of sidewalk by joint
b14-031_26_Rd41.jpg
Linked Element(s):
Reinforced concrete deck coated reinforcing -> Sidewalk
Routine Item 42
West approach
b14-031_26_Rd42.jpg
Linked Element(s):
Compression joint seal
Page 57 of 59
23B-14-031 19-May-2026 inspection as of 22-Jun-2026
Specifications for National Bridge Inventory (SNBI) Data items
B-14-031
Span Material and Type (B.SP)
Span 1
Number Beam Lines:
4
Wearing surface:
Concrete - monolithic (C01)
Span Material:
Steel - rolled shapes (S01)
Deck Protective system:
None (0)
Span Protective System:
Unknown (U)
Deck reinforcing protective system:
Coating - epoxy coated (C01)
Deck Material and Type:
Reinforced concrete - cast-in-place (C01)
Deck Stay In Place Forms:
None (0)
Span 2
(main)
Number Beam Lines:
4
Wearing surface:
Concrete - monolithic (C01)
Span Material:
Steel - rolled shapes (S01)
Deck Protective system:
None (0)
Span Protective System:
Unknown (U)
Deck reinforcing protective system:
Coating - epoxy coated (C01)
Deck Material and Type:
Reinforced concrete - cast-in-place (C01)
Deck Stay In Place Forms:
None (0)
Span 3
Number Beam Lines:
4
Wearing surface:
Concrete - monolithic (C01)
Span Material:
Steel - rolled shapes (S01)
Deck Protective system:
None (0)
Span Protective System:
Unknown (U)
Deck reinforcing protective system:
Coating - epoxy coated (C01)
Deck Material and Type:
Reinforced concrete - cast-in-place (C01)
Deck Stay In Place Forms:
None (0)
Substructure Material and Type (B.SB)
Non Cardinal
Abutment
Substructure material:
Reinforced concrete - cast-in-place (C01)
Foundation protective system:
None (0)
Substructure protective system:
None (0)
Pier 1
Substructure material:
Reinforced concrete - cast-in-place (C01)
Foundation protective system:
None (0)
Substructure protective system:
None (0)
Pier 2
Substructure material:
Reinforced concrete - cast-in-place (C01)
Foundation protective system:
None (0)
Substructure protective system:
None (0)
Cardinal
Abutment
Substructure material:
Reinforced concrete - cast-in-place (C01)
Foundation protective system:
None (0)
Substructure protective system:
None (0)
Geometry (B.G)
NBIS bridge length:
132.2
Curved bridge:
Not curved (N)
Maximum bridge height:
11
Inspection Requirements (B.IR)
NSTM Inspection Required:
No (N)
E or E' fatigue Details:
Appraisal (B.AP)
Approach roadway alignment:
Good (G)
Overtopping likelihood:
Never (0)
Page 58 of 59
24B-14-031 19-May-2026 inspection as of 22-Jun-2026
This page intentionally left blank
Page 59 of 59