Agenda & Packet
Village of Kimberly · Outagamie County · meeting of Oct 6, 2026 · Agenda packets
Open the original document More from Village of Kimberly
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
The Village of Kenilworth is subject to the requirements of the Americans with Disabilities Act of 1990. Individuals with disabilities
who plan to attend this meeting and who require certain accommodations in order to allow them to observe and/or participate in this
meeting or who have questions regarding the accessibility of the meeting or the facilities are requested to contact the Village at 847-
251-1666 promptly to allow the Village to make reasonable accommodations for those persons.
Notice of Special Meeting
There will be a special meeting of the Committee of the Whole of the Village Board of Trustees
on October 6, 2026 at 5:00 p.m. The meeting will be held at 419 Richmond Road in
Kenilworth, IL.
Meeting Link
If you do not have access to a computer, you may attend via telephone:
+1 872-242-8055
Meeting ID: 672 169 8#
Committee of the Whole
Special Meeting Agenda
October 6, 2026 at 5:00 p.m.
I. Call to Order / Roll Call
II. Presentation and Discussion (Budget Workshop #1)
A. General Fund (01) and Capital Fund (27) Overview and FY 2027 Five-Year Capital
Improvement Program & Proposed Capital Projects
III. Business from the Public
IV. Adjourn
Village of
1
Request for Board Action
Agenda Item: II.A
Subject: Fiscal Year 2027 Budget Workshop #1
• General Fund Overview 2027 Draft Budget / 2026 Year End Draft
Projections
• 2027 Proposed Capital Projects & 5-Year Capital Improvement Program
Staff Contact: Kathy Thake, Village Manager
Donald Leicht, Public Works Superintendent
Jordan Schmidt, Administration
Kathleen Morley, Finance
Summary: The purpose of this memo is to provide a summary of the information to be discussed
at the Village of Kenilworth’s 2027 Budget Workshop. Major topics to be covered:
• General Fund and Capital Fund Overview
• Capital Improvement Program
Committee of the Whole
Budget Workshop I
Committee of the Whole
Budget Workshop II
Committee of the Whole
Budget Workshop III
October 6, 2026 – 5:00 p.m.
o General Fund / Fund 27
Overview
o Capital Improvement Plan
October 8, 2026 – 5:00 p.m.
o Department
Accomplishment and FY27
Initiatives Presentation
o Annual Fees
November 2, 2026 – 7:00 p.m.
o General Fund Update
o Other Funds Overview
o Property Tax Levy
o Water Rate Study Findings
General Fund (01) and Capital Fund (27) Overview
DRAFT 2027 Budget General Fund / Capital Fund
Overview: Kenilworth's 2027 Proposed Draft General Fund Budget is balanced with an
approximate surplus of $385,036, figures are subject to change.
GENERAL FUND 2025 Actual 2026 Budget
2026 DRAFT
Year-End
Estimate
2027
Proposed
DRAFT
Budget
Budget
FY26B v.
FY27B
Total General Operating Revenues 6,659,238 5,912,055 6,413,153 6,420,865 508,810
Operating Expenses 4,840,284 5,541,928 4,910,955 5,535,829 (6,099)
Capital Transfers 2,250,000 200,000 200,000 500,000 300,000
Surplus(Deficit) General Operating Fund: (431,046) 170,127 1,302,198 385,036 214,909
Considered By: Date:
Village Board 10/06/26
Village of
Revenues: The General Fund is a governmental fund that accounts for all revenues and
expenditures of the Village, which are not accounted for in any other fund. Revenues in the
General Fund support the core operations of the Village. For FY2027, preliminary revenues of
$6,420,865 are anticipated. The growth is broad-based versus dependent on a single source of
revenue. Sales tax and non-home-rule sales tax are projected to remain significant revenue
sources outside of property tax, with future estimates informed by historical trends and updated
performance data. Additionally, building permits remain positive for the upcoming year.
Individual revenue GL line items are reviewed based on a historical trend analysis in order to
project revenues for the upcoming year. In order to be prepared for unexpected events and lower
than anticipated revenues or higher than anticipated expenditures, the Village budgets revenues
realistically but also conservatively.
Expenditures: Preliminary 2027 operating expenditures, not including one-time transfers to
CIP and Water, equals $5.5m (less than >1%) over the 2026 Budget. Personnel costs of $3.2m
account for a significant portion of the expenditures.
Overview: Kenilworth's 2027 Proposed Draft Capital Fund Budget is balanced with a surplus of
$606,074.
Capital Fund Revenues: The Capital Fund is the main fund where financial activity related to
general capital projects occurs on an annual basis. The revenues for the 2027 Capital Fund
Budget includes a awarded grant of $271,000 for road improvements as well as a transfer of
funds of $250,000 in order to build up the fund balance for large scale projects in the future. The
Village strives to maintain annual expenditures below annual revenues, except when one‑time
capital projects occur.
Capital Fund Expenditures: Preliminary 2027 capital expenditures equal $380,725 from the
capital fund, this is a 35% reduction over the 2026 budget. An in depth look at CIP will be
discussed later in this memo.
CAPITAL PROJECTS FUND 2025 Actual 2026 Budget
2026 DRAFT
Year-End
Estimate
2027
Proposed
DRAFT
Budget
Budget
FY26B v.
FY27B
Total Capital Project Fund Revenues 650,964 665,000 670,900 986,900 50,900
Total Capital Project Fund Expenses 3,540,244 514,770 405,492 380,725 (134,045)
Surplus(Deficit) Capital Projects Fund: (2,889,280) 150,230 265,408 606,175 184,945
DRAFT 2026 Year End
Estimated Projections
Overview: The Village of Kenilworth adopted the FY2026 Budget with the General Fund
surplus of $170,127 including transfers. Through controlled spending and increased revenues,
the FY2026 year-end estimated projections reflect an increased surplus over the budgeted
figures of approximately $1.3 million including planned transfers. Furthermore, the surplus
reflects two factors: 1) the revenues are projected higher than originally budgeted, and 2)
expenditures are lower than anticipated due to personnel.
2026 Revenue Projections: Positive variance in revenues of approximately $501,098 is
generally due to sales tax and non-home rule sales tax, building permit revenues, interest
income and ambulance fees. Sales tax is projected conservatively based on historical trends. It
must be noted, due to delayed property tax collection the full amount of property may not be
realized as budgeted, therefore it is beyond the Villages control.
2026 Expenditure Projection: Expenditures are projected lower by approximately $630,973,
primarily due to unfilled positions for part of the year in the Police Department. Important to
note, the figures are not yet finalized and are subject to change.
Revenue Category 2026 Budget 2026 DRAFT Year-
End Estimate
FY26B v.
FY26P
Property Taxes 3,665,965 3,666,015 50
Other Taxes 746,086 1,101,547 355,461
Utility Tax 200,000 195,000 (5,000)
Licenses & Fines 102,050 100,598 (1,452)
Permits 539,950 615,842 75,892
Svc Charges 432,129 422,261 (9,868)
Misc. 225,875 311,890 86,015
Total GF Revenue 5,912,055 6,413,153 501,098
Expense Category 2026 Budget 2026 DRAFT Year-
End Estimate
FY26B v.
FY26P
Personnel 1,955,721 1,548,068 (407,653)
Employment Expense 1,394,053 1,214,662 (179,391)
Contractual Services 1,996,601 1,964,616 (31,985)
Commodities 94,927 102,007 7,080
Other 55,990 45,653 (10,337)
Minor Capital 44,636 35,949 (8,687)
Total GF Expenses 5,541,928 4,910,955 (630,973)
2027 Proposed Capital Projects & 5-Year Capital Improvement Program
The Village of Kenilworth uses a five-year Capital Improvement Program (CIP) to identify, plan,
and coordinate the financing and timing of infrastructure improvements, including street projects,
utilities such as water mains, sanitary sewers, and storm sewers and large purchases .
Maintaining high-quality infrastructure is essential to the communities vitality and quality of life.
Kenilworth continues to prioritize strategic, long-term investment through its comprehensive CIP
so residents can clearly see how the Village plans for future needs.
As a component of the budget process, Village staff separate the capital and operating components
of the budget. Presenting the budget in this format provided elected officials and residents with a
clearer and more transparent understanding of the capital items, which are typically the largest
in terms of cost and impact on the community.
The five-year Capital Improvement Program (CIP) lays out the projects identified as capital items
for the next several years, with a focus on FY27. Please note that the future years (FY28 -FY31)
may change based on available revenues and other funding sources.
FY2027 CIP BUDGET OVERVIEW:
The FY2027 CIP budget reflect s the Village’s continued commitment to investing in the repair,
replacement, and enhancement of Kenilworth’s infrastructure and community assets. This plan
is often maintained a pay -as-you-go funding approach, avoiding the need for borrowing while
supporting significant long-term improvements.
The FY2027 draft CIP includes a $ 924,875 budget, including $434,125 for street improvements;
$209,000 for building and grounds, $110,000 lead service replacement and water maintenance ;
$51,600 for information technology improvements; $26,000 for sewer; and $94,150 for vehicles and
equipment. It’s important to note, CIP project are funded through various Funds of which Fund
27 is the main source of funding, followed by TIF Fund 14 and Water Fund 35.
Information
Technology (IT)
5%
Buildings & Grounds
23%
Vehicles &
Equipment
10%
Sewer
3%
Streets
47%
Water
12%
FY 2027 Proposed Projects
Funding Source 2027
General Fund (01) $68,150
Sewer Fund (02) $10,000
MFT Fund (06) $0
TIF Fund (14) $326,000
Capital Fund (27) $380,725
Beach Fund (28) $30,000
Water Fund (35) $110,000
Total $924,875
Major projects slated for 2027 include:
Woodstock Avenue Repaving & Curbs $105,000
Kent Road Repaving $37,000
Lead Service Line Replacement Program $90,000
Public Works Truck Replacement (F250) $52,000
Façade Improvement Grant $45,000
Green Bay Road Phase I Eng. $240,000
Annual Parkway Tree Trimming $25,000
Green Bay Road Planters $25,000
Flashing/Caulking/Tuck Pointing Village Hall Knee Wall $30,000
Beach Projects (signage) - $30,000 $30,000
Village Hall HVAC Replacement $25,000
Recommendation:
No recommendation is sought, but a matter of discussion and Village Board consensus on the
process moving forward.
Attachments:
• Five-Year Capital Projects Projections Summary Spreadsheet;
• Project Profile Sheets
FY 2027
5-Year Capital Improvement Program
&
2027 Proposed Capital Projects
Prepared for October 6, 2026
Committee of the Whole
8
Village of
Memorandum
TO: Village Board of Trustees
FROM: Kathy Thake, Village Manager
Jordan Schmidt, Management Analyst
DATE: September 30, 2026
RE: 5-Year Capital Improvement Program & 2027 Proposed Capital Projects
___________________________________________________________________________________________
Background
As a component of the Fiscal Year 2027 (FY27) budget process, Village staff have
separated the capital and operating components of the budget. Presenting the budget for
consideration in this manner provides elected officials and residents with a more
transparent process and better understanding of the capital items in the budget, which are
often the largest in terms of dollars and impact on residents.
Presenting a five-year comprehensive Capital Improvement Program (CIP) allows the
community to see how the Village of Kenilworth plans. This Village Board packet includes
two components of the CIP: the five-year capital projects projections spreadsheet and the
booklet of individual project profile sheets that elaborate on each CIP item.
CIP Document
The extensive document titled "Five-Year Capital Improvement Program and 2027
Proposed Capital Projects” lays out the projects identified as capital items for the next
several years, with a focus on FY27. Please note that the future years (FY2028-FY2031) may
change based on available revenues and other funding sources.
CIP Project Booklet
The packet also includes individual project profile sheets that detail projects in terms of
cost, justification/need, and impact on the Village. Department staff completed these
documents and submitted them to the CIP team for review.
9
There are three categories to choose from:
Capital Project: Most items on the list are considered projects, which is a broad
category but usually means having a specific beginning and end
date and a specific cost.
Capital
Maintenance:
The definition of this category has shifted slightly throughout
this budget process and now designates items that incur costs
annually, such as sewer maintenance programs or tree-care
services.
IT/Capital
Purchase:
This category includes purchased or installed items, especially
vehicles or IT components like software.
Other fields on the project profile sheet include:
Department: Indicates to which department a project is most relevant.
Total Project Cost: Total, annual or ongoing cost of the project applicable for a
fiscal year(s).
Project Title: A brief name for the project.
Project
Justification/Benefit:
Explains why the project is necessary, and the impact of the
project on Village operations or to stakeholders.
Operating Fund
Impact:
Explains, if applicable, the effect the project will have on other
Village costs.
Funding Source: Identifies the primary fund location for each project, though
these can be subject to change and can be complicated by the
presence of grants or uncertain sources of external funding.
Please reach out if you have any questions relating to this document as you begin
reviewing the proposed CIP.
10
Item/Service Freq. Fund 2027 2028 2029 2030 2031 Description/Note
Information Technology (IT)
Squad Car Laptops 1x/6yr CPF $20,000
Office Desktops 1x/5yr CPF $2,600 $1,300
Office Laptops 1x/4yr CPF $2,800 $5,600 $4,200 $4,200 $4,200
Wireless Access Points 1x/7yr CPF Anticpated replacement in 2032
UPS - Uninterruptible Power Supply as needed CPF $1,200
Main Network Server 1x/7yr CPF $40,000 Includes virtualization hosts, power switch, and storage array.
Firewall 1x/6yr CPF $5,565 $5,845
DUO Multi-Factor Authenticator one time CPF Staff is evaluating
Replication Server Replacement 1x/7yr CPF $16,000
Sharepoint Migration one time CPF $30,000
Network Switch 1x/7yr CPF $3,824
Document Scanning as needed CPF $9,000 $10,000 $10,000
FUTURE PROJECTS
Laserfiche Cloud Upgrade
Board Room A/V Equipment
Total IT: $51,600 $81,165 $14,200 $13,869 $15,500
Buildings & Grounds
Misc. Beach Projects as needed BCH $30,000 Interior demolition old bathroom, donor plaque, beach signage
Beach Amenities as needed GEN $5,000 Shade, Planters, etc.
HVAC Replacement - VH 1x/30yr CPF $25,000 $27,000
Roof Replacement - VH 1x/30yr CPF Estimated replacement in 2033
Roof Replacement - PW 1x/30yr CPF $400,000
VH Parking Lot Grind/Overlay 1x/30yr CPF $40,000
Garage Door Replacement - PW 1x/30yr CPF New brackets fabricated to extend life of doors. Will be evaluated on an annual basis
Flashing/Cauking/Tuckpointing VH Kneewall as needed CPF $30,000
Village Fountain Grouting 1x/5yr GEN Inspect annual for need
Holiday Lights as needed CPF $10,000 Based on PWC feeback
Façade Improvement Program annual TIF $45,000 $45,000 $45,000 $45,000
Green Bay Road Planters as needed TIF $25,000 $25,000 Project costs inlcude the cost of plantings
Annual Parkway Tree Planting Program annual GEN $14,000 $14,000 $14,000 $14,000 $14,000
Annual Parkway Tree Trimming Program annual GEN $25,000 $26,250 $27,563 $28,941 $30,388 Annual trimming. Village streets completed on a rotating five year basis.
Annual Village Property Tree Trimming Program annual GEN $5,500 $6,100 Village properties tree trimming completed on a three year rotating basis
FUTURE PROJECTS
Beach Improvement Project Future Phases Interior of Water Treatment Plant, North Beach Sailing Club, Overlook, Railings
Security Assessment
Total Buildings & Grounds: $209,000 $142,750 $526,563 $94,041 $44,388
Vehicles & Equipment
Squad Car 80k miles CPF $63,000
Community Service Officer (CSO) Car 1x/20yr CPF $20,000 Cross-departmental vehicle, and available to be used by other Village personnel for offical business
New Holland Back Hoe 1x/20yr CPF $150,000
Ford F250 1x/20yr CPF $52,000
Ford F550 Utility Dump Truck 1x/20yr CPF $85,000.00
Police Radios (12) 1x/7yr CPF $115,000
Body Worn Cameras 1x/5yr GEN $16,800 $16,800 $17,700 $17,700 $17,700
Tasers 1x/5yr GEN $5,350 $5,350 $5,350 $5,350
FUTURE PROJECTS
Ford F350 Bucket Truck
M2 106 Dump Truck
Sewer Jetter
M2 106 Dump Truck
Ventrac 4500z Tractor
Total Vehicles & Equipment: $94,150 $22,150 $288,050 $171,050 $17,700
5 - Year Capital Projects Projection
W:\Budget\FY2027\CIP Final 9/30/2026 3:40 PM
11
5 - Year Capital Projects Projection
Sewer
Drop Chamber 604 Green Bay (MWRD Green Bay/Rodger) one-time TIF $16,000.00 Remainder of design engineering to get project shovel ready
Manhole Lining 1x/30yr. SWR
Green Bay Road - Sewer Televise as needed SWR $6,000.00
Catch Basin Cleaning annually SWR $4,000.00 $4,200.00 $4,410.00 $4,630.50 $4,862.03
FUTURE PROJECTS
Total Sewer: $26,000 $4,200 $4,410 $4,631
Streets
Abingdon Avenue & Robsart Road Grind/Overlay 1x/20yr CPF $120,000
Kent Road Grind/Overlay 1x/20yr CPF $37,000
Cummings Avenue Grind/Overlay 1x/20yr CPF $30,000
Essex Grind/Overlay 1x/20yr CPF $65,000 Kenilworth - Oxford
Oxford Road - Curbs & Road Reconstruction - Construction + Const. Eng. 1x/20yr MFT $904,000 Design engineering work currently underway
Park Drive W. Bound Lane Grind/Overlay & Curbs 1x/20yr CPF $120,000
Tuckpointing Bridges as needed CPF $7,000 Bridge decks on Sheridan Road, Abbotsford Road, and Melrose Avenue
Woodstock Grind/Overlay & Curbs 1x/20yr CPF $105,000 Cumnor - Warwick
Street light - Conduit/Boring as needed GEN $2,000
Street Light Poles annual CPF $6,250 $15,000 $6,250 $15,000 $6,250
Sidewalk replacement annual CPF $28,875 $30,319 $31,835 $33,426 $35,098
Green Bay Road Phase 1 Engineering one-time TIF $240,000 $71,410
Green Bay Road Design Engineering Phase II one-time TIF $305,000 $305,000 Total estimated cost of $610,000
Green Bay Road Construction Phase III one-time TIF $9,000,000
Green Streets Phase 1 - Maintenance one-time CPF $15,000 $15,000
FUTURE PROJECTS
Sheridan Road Bridge Rebuild Investigating in FY27, construct in FY28
Crack Fill
Abbotsford Grind/Overlay Melrose - N. Village Limit
Ivy Court Grind/Overlay & Curbs
Exmoor Grind/Overlay Roger - N. Village Limit
Greenwood Grind/Overlay
Total Streets: $434,125 $1,460,729 $470,085 $9,078,426 $106,348
Water
Water Main Replacement (Abingdon/Robsart/Tudor) - Design Eng. 1x/50yr CPF Design engineering work currently underway
Water Main Replacement (Abingdon/Robsart/Tudor) - Construction+ Const. Eng 1x/50yr WTR Project to be reviewed for multi-phase, timing dependent on available funding
Water Main Replacement (Park) - Construction 1x/50yr WTR $415,650 Green Bay Road - Sterling finalize design work in 2028
Water Main Replacement (Ridge) - Design Eng. 1x/50yr WTR
Water Main Replacement (Green Bay) - Design Eng/Construction 1x/50yr WTR $2,000,000 Park - N. Village Limit
PRV Station Maintenance 1x/15yr WTR $20,000 $25,000 $25,000 Lid replacement, valve replacement, conduit, and floor replacement
Lead Service Line Replacement Program annual WTR $90,000 $90,000 $90,000 $90,000 $90,000 TIF funds may be used dependent on location of property
Water Meter Replacement Program 1x/30yr WTR $540,000 Village Wide
Water Tower Cleaning 1x/5yr WTR $2,500
FUTURE PROJECTS
Water Main Replacement (Ridge) - Design Egn/Construction Kenilworth - N. Village Limit
Water Main Replacement (Wayland) - Design Eng/Construction Green Bay - West Dead End
Water Main Replacement (Warwick) - Design Eng/Construction Cumberland - N. Village Limit
Total Water: $110,000 $117,500 $1,070,650 $2,090,000 $90,000
Grand Total by Year: $924,875 $1,828,494 $2,373,957 $11,452,016 $273,935
W:\Budget\FY2027\CIP Final 9/30/2026 3:40 PM
12
Funding Source 2027 2028 2029 2030 2031
General Fund (01) $68,150 $67,900 $64,613 $72,091 $62,088
Sewer Fund (02) $10,000 $4,200 $4,410 $4,631 $4,862
MFT Fund (06) $0 $904,000 $0 $0 $0
TIF Fund (14) $326,000 $446,410 $350,000 $9,045,000 $0
Capital Fund (27) $380,725 $288,484 $884,285 $240,295 $121,848
Beach Fund (28) $30,000 $0 $0 $0 $0
Water Fund (35) $110,000 $117,500 $1,070,650 $2,090,000 $90,000
Total $924,875 $1,828,494 $2,373,957 $11,452,016 $278,797
5 - Year Fund Cost Projection
13
FY 2027
Proposed Capital Projects
14
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
Funding for this annual program comes out of the Forestry Department's general
fund balance. $14,000 is budgeted for FY27.
General Fund: 01-600-5768
On an annual basis, the Village provides a selection of tree species to be planted in
viable planting locations throughout Village parkways. Residents have the
opportunity to choose what species is planted in their parkway.
The Village has been awarded Tree City status for the past four years thanks to our
commitment to maintaining and diversifying our tree canopy. One of the
requirements to maintain Tree City status is to budget a minimum of $2 per capita
towards tree maintenance and care. Over the past five years, the Village has
budgeted between $12,000-$17,000 annually to fund the program. The annual
Parkway Planting Program supports the community's mission to maintain/improve
Kenilworth's tree canopy. Having a healthy, diversified tree inventory beautifies the
community, improves the environment, and provides benefits for generations to
follow.
Annual Parkway Tree Planting Program
Public Works
GEN $14,000 $14,000 $14,000 $14,000 $14,000 $70,000
15
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
Funding for this annual program comes out of the Forestry Department's general
fund balance. $25,000 is budgeted for FY27.
General Fund: 01-600-5766
The Public Works Department trims a section of the Village's parkway trees on a
five-year cycle, annually.
Parkway trees are trimmed on a five-year cycle, annually in the winter months.
Trimming/pruning trees in the winter is best for the health of the tree. The five-year
cycle in place allows for the work, and cost, to be spaced out equally year-over-
year, rather than one Village-wide tree trimming every five years. Trees are trimmed
and pruned to maintain their longterm health. Trimming and pruning in the winter is
ideal for the trees, as invasive bugs and diseases are dormant and less likely to
infect the tree as it heals from the trimming.
Annual Parkway Tree Trimming Program
Public Works
GEN $25,000 $26,250 $27,563 $28,941 $30,388 $138,141
16
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
$5,000 is budgeted for these projects in the General Fund.
General Fund: 01-800-8007
Providing additional beach amenities to compliment and enhance the renovated
beach experience.
Results of the annual beach satisfaction survey indicate patrons have an
overwhelming desire to have access to additional beach amenities, such as shade
seating options and new picnic tables tables, and see additional beautification
efforts, such as planters, on the property. Funding these small amenities
compliments and enhances the entire renovated beach experience for residents.
Additionally, the interior demolition and renovation of a portion of the top floor of the
water plant will take place. New storage spaces and renovated staff bathrooms will
be provided in the renovated space.
Beach Amenities
Public Works
GEN $5,000 $5,000
17
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
The Facade Improvement Grant program does not impact the Village's
operating fund.
TIF Fund: 14-100-8102
Continued implementation of the grant program for eligible exterior improvements in
the TIF district. Awards are up to $15,000. The total project cost enables the Village
to award a minimum of three (3) projects annually.
The Village has an ongoing goal to enhance the Business District's
aesthetic and encourage reinvestment / development. However,
improvement costs may create financial barriers for some businesses and /
or property owners. Adopted by the Village Board in August 2024, the
Facade Improvement Grant program offsets some of those costs while also
enhancing the Business District's curb appeal. The Facade Improvement Grant
utilizes TIF funds to pay for eligible exterior improvements in the Business District
up to $15,000. If the improvements lead to increased property values, the
incremental growth in tax revenues would contribute back to the TIF fund, which
then could be directed towards further revitalization and redevelopment of the
Business District. Further, the program may attract new businesses and incentivize
existing businesses to invest in their space. Since the program's approval, three
local businesses have taken advantage of the opportunity to beautify their space.
Facade Improvement Program
Administration
TIF $45,000 $45,000 $45,000 $45,000 $45,000 $225,000
18
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
This does not impact the operating fund.
Capital Fund: 27-400-8006
Installation of holiday lighting and decor to be placed around town, pending direction
from the Public Works Committee.
The Public Works Department annually installs holiday decorations around
the Village. Over the past several years, the Village has explored increasing
the amount of decorations. In 2024, the Village purchased lighted wreaths
and garland to install on the street lights along Green Bay Road. Expanding the
Village's inventory of holiday decor is in response to resident input,
and the desire to increase the level of beautification in town, as identified in the
annual budget goals.
In Q1 of FY27, the Public Works Committee will convene to discuss a long-term
Holiday Light Comprehensive Plan. Committee feedback will be sought to determine
if the current amount of holiday lights is sufficient, or if additional is desired.
Holiday Decor
Public Works
CPF $10,000 $10,000
19
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
This project has no impact on the operating fund.
Beach Fund: 28-100-8007
The completion of miscellaneous beach projects to enhance the results of Phase 2
of the Beach Improvement Project.
There are some outstanding finishing touches to be put on our new beach post
Phase 2 construction, including the installation of donor plaques and beach signage.
Architectural firm Woodhouse Tinucci will consult the Village on adding these
features in a way that compliments the renovated beach.
Beach Project - Signage, Plaques, other beautification efforts
Public Works
BCH $30,000 $30,000
20
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
The installation of planters will have a minor impact on the operating
budget, as the Public Works Department, along with the assistance of a contractor
maintains the planters (plantings, watering, etc.). The Village is continuing to explore
partnerships with local garden clubs to assist with maintenance.
TIF Fund: 14-100-8006
The purchase of six planters in 2027 to continue street-scape improvements along
Green Bay Road and Park Drive. In addition to the purchase of new planters, the
project includes the cost of planting supplies and maintenance throughout the
season.
In 2022, the Village Board adopted an updated vision for the Green Bay
Road Corridor, with a focus upon improving the business district. Since then, the
Villages annual budgets included goals for the implementation of this vision. In
2024, the Village contracted with Teska Associates to assist in the identification and
development of a parkway planter installation along the Green Bay Road Business
District. Since 2025, the Village has installed 13 planters in the identified locations
along Park Drive and Green Bay Road. The purchase of six additional planters will
allow the continued implementation of the plan, and vision for the Green Bay Road
Corridor.
Green Bay Road Planters
Public Works
TIF $25,000 $25,000 $50,000
21
!
"
#$%&"
'"
'!#($()
*+%,*#-,$()./*+%,*#-,$(.-
"
0
11!1'!,
#$%&2
21'!3#($()
*+%,*#-,$().0*+%,*#-,$(.-
2!331&!34
+)-!5616
!34'!3#((+7
-8)(8$($+
22
!
"
#$%&"
'"
'!#($()
*+%,*#-,$()./*+%,*#-,$(.-
"
0
11!1'!,
#$%&2
21'!3#($()
*+%,*#-,$().0*+%,*#-,$(.-
2!331&!34
+)-!5616
!34'!3#((+7
-8)(8$($+
23
!
"
#$%&"
'"
'!#($()
*+%,*#-,$()./*+%,*#-,$(.-
"
0
11!1'!,
#$%&2
21'!3#($()
*+%,*#-,$().0*+%,*#-,$(.-
2!331&!34
+)-!5616
!34'!3#((+7
-8)(8$($+
24
!
"
#$%&"
'"
'!#($()
*+%,*#-,$()./*+%,*#-,$(.-
"
0
11!1'!,
#$%&2
21'!3#($()
*+%,*#-,$().0*+%,*#-,$(.-
2!331&!34
+)-!5616
!34'!3#((+7
-8)(8$($+
25
!
"
#$%&"
'"
'!#($()
*+%,*#-,$()./*+%,*#-,$(.-
"
0
11!1'!,
#$%&2
21'!3#($()
*+%,*#-,$().0*+%,*#-,$(.-
2!331&!34
+)-!5616
!34'!3#((+7
-8)(8$($+
26
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
This is a typical maintenance cost, required every 10 years. There is no annual
operating fund impact.
Capital Fund: 27-300-8007
Tuck pointing, flashing, and caulking of the brick rooftop seat wall along various
locations on building.
Village hall has 3' tall brick wall on the roof. While the roof itself is still in fair
condition, and under warranty until 2033, the point where the wall and roof meet is
starting to show its age. The joints are beginning to fail, which has allowed some
water infiltration during larger rain events. To prevent further damage to the roof
itself, maintenance is required. The planned work includes tuck pointing,
replacement of flashing, and caulking to prevent leaking into the building. In
addition, there are also various joints along the face of the building that need tuck
pointing. This maintenance work will address the leaking issues currently ongoing,
as well as extend the life of the roof and prevent future infrastructure failure.
Village Hall Tuck Pointing/Caulking of Seat Wall
Public Works
CPF $30,000 $30,000
27
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
The purchase of the replacement HVAC units is a one time expense, and not
expected to impact the operating budget.
Capital Fund 27-300-8007
Replacement of two rooftop HVAC units at Village Hall.
Village Hall is served by three separate rooftop HVAC units, which provide heating
and cooling to the building. Two of the units are over 20 years old and have had
numerous repairs over the past several years. This past winter, the third unit
required an emergency replacement of its heat exchanger, which cost $13,140.
Each unit serves a different area of the building. Due to the failure of one of the
units this year, part of the building was without heat for a few days. Due to the age
and importance of this equipment, it is recommended that two of the units be
replaced over the next two years. The third unit, which required the emergency
repair, has extended its life by an estimated five plus years. As a result, its
replacement is not recommended at this time, and will be evaluated annually
instead.
Village Hall HVAC Rooftop Replacement
Public Works
CPF $25,000 $27,000
X
$52,000
28
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
The purchase of a replacement server is a one-time cost. The software utilized to
perform the replication is an annual cost, which currently cost approximately $3,000
annually.
Capital Fund 27-100-8004
Replacement of the current replication server housed in Lake Bluff for Village data
backups.
The Village currently houses a replication server in Lake Bluff, where regular data
backups are stored in case of an emergency. This is done in partnership with the
Village of Lake Bluff, who houses their backup server in Kenilworth. The current
backup server is currently end of life, and has already surpassed its typical lifespan.
To ensure Village data is properly protected and accessible in case of an
emergency, the server requires replacement.
The Village's IT vendor conducted an analysis of the options available to the Village,
and recommended the replacement of a physical server, versus transitioning to the
cloud. While the cloud version offers greater distance from the primary environment,
it comes at a higher cost, which would continue to vary if additional storage is
required. The replacement of the physical server offers price predictability, while
maintaining ownership over the process.
Replication Server Replacement
Administration
CPF $16,000 $16,000
29
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
The replacement of computers is a capital expense and not expected to impact the
operating funds. The Village has developed an ongoing computer replacement
program to ensure computers are replaced on a planned schedule, avoiding
unexpected replacements in the future. The ongoing cost is expected to be between
$4,000 - $7,000 annually moving forward.
Capital Fund: 27-100-8004 and 27-900-8004
The Village computers require upgrades on a periodic basis to ensure they provide
optimal performance for staff. In 2027, four computers are planned for replacement:
two laptops and two desktops.
The typical lifespan of laptops is 3-5 years and 5-7 years for desktops. In 2027, four
computers are aging out, and due for replacement. While the machines themselves
are still operational the internal components continue to degrade and slow.
Replacing on a regular interval ensures staff are equipped with the most up-to-date
equipment.
Through the planned replacement of aging computers, this eliminates potential
maintenance and or unexpected replacements cost. Additionally, new computers
will have current technological advancements, which bring higher performance to
staff.
Computer Upgrades
Administration/Public Works/Police
CPF $5,400 $5,600 $4,200 $4,200 $5,500 $24,900
30
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
The digitization of historical building plans is not expected to impact operating funds.
Scanning can be completed bi-annually as funds become available.
Capital Fund: 27-100-8004
Public Works houses over 50 boxes of large format historical building plans. Each
box contains between 5-25 plan sets, ranging in length from 1-10+ pages. The
documents are planned to be scanned incrementally and stored in the Village's
document management system, Laserfiche, over the next several years.
Over 50 boxes containing large format historical building plans are stored on
shelves abutting a wall at the Public Works building. The boxes are space
consuming and the plans do not have a digital back-up. In 2022, the Village began
digitizing its building plan documents to reduce onsite storage, create a file back-up,
and improve document accessibility for residents, staff, and consultants. Scanning
large format documents is typically more expensive due to the size of copier
required to complete the work. Due to this, the document scanning is expected to
occur incrementally bi-annually as funds allow.
Document Scanning
Administration
CPF $9,000 $10,000 $10,000 $29,000
31
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
The purchase of new squad car laptops is a one-time capital expense.
Capital Project Fund 27-900-8004
The purchase of four new Panasonic Toughbook squad car laptops, warranty,
accessories, and security software.
Squad car laptops are essential for police operations and are necessary for officers
to write and submit reports, including incident and traffic crash reports, conduct
investigations, coordinate and communicate with Glenview Central Dispatch, and
the issuing of traffic citations and warnings as part of traffic safety and enforcement.
The useful life of a squad car laptop is approximately six years. The current
Panasonic Toughbooks are at the end of their useful life and replacement is
necessary to maintain basic public safety operations.
Police Squad Car Laptops
Police Department
CPF $20,000 $20,000
32
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
This is a one-time expense, which will not impact the operating fund annually. Once
purchased, the UPS is not expected to require replacement within the next five
years.
Capital Fund: 27-100-8004
The purchase of an uninterruptible power supply (UPS) to deploy on the main
server rack.
The Villages core IT needs are housed and maintained on several key pieces of
infrastructure. Power is supplied by ComEd, and in emergency situations, a backup
generator will provide power to the building. To serve as an additional redundancy,
UPS's are recommended to ensure these key pieces of IT infrastructure remain
operational during an emergency. The UPS provides immediate backup power,
ensuring the server stays up while the generator kicks on.
While more and more Village operations move online, it is critical that they are
protected, and remain operational during emergencies. The UPS ensures critical
equipment such as phones and Internet remain online in the event power is lost.
Uninterruptible Power Supply (UPS)
Administration
CPF $1,200 $1,200
33
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
The program is completed annually, and the only cost is associated with the rental
equipment.
Sewer Fund: 02-100-5048
The removal of heavy debris from catch basins throughout the village.
Catch basins are used to collect and distribute storm water from the streets to
Village sewer system before making its way to the Metropolitan Water Reclamation
District (MWRD) system. Catch basins can become clogged debris, restricting the
storm water from draining, potentially resulting in flooded streets, and Property
damage.
Catch basin cleaning is completed on an annual basis to help prevent potential
flooding and property damage. The work will be completed in house by Public
Works Staff, utilizing a rental piece of equipment.
Catch Basin Cleaning
Public Works
SWR $4,000 $4,200 $4,410 $4,630 $4,862 $22,102
34
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
This project does not impact the operating fund.
TIF Fund: 14-100-5322
Remainder of Design Engineering to get the project shovel ready.
In 2024, the Village began design work for the relocation of an MWRD sewer drop
chamber, located under the Village owned parcel at 604 Green Bay Road.
Construction of the new facility is dependent on a development on the parcel
moving forward. At this time, there is no active development pursuing the parcel,
however, having the project shovel ready is important if a development were to
occur. Outstanding work includes receiving IDOT and MWRD permit approvals,
finalizing plans, specifications, & estimate documents, completing Village review,
and preparing Issue‑for‑Bid materials. This work is planned to be completed in
2027 in order to progress the project to the shovel-ready stage.
MWRD Drop Chamber (604 Green Bay Rd)
Sewer
TIF $16,000 $16,000
35
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
This is a one time cost to the sewer fund, to determine if any future capital needs
are required.
Sewer Fund: 02-100-5048
Televise the 24" sanitary sewer line under Green Bay Road.
The Village owns and maintains a 24" sanitary sewer line that runs under Green
Bay Road. The line has never been televised or lined, and as a result, staff is
unaware of any potential maintenance needs that may be required. With the Green
Bay Road Enhancement Project upcoming, it is imperative that we evaluate the
infrastructure now to determine if any work on it is required, prior to the completion
of the Green Bay Road Enhancement Project.
Green Bay Road - Sewer Televise
Public Works
SWR $6,000 $6,000
36
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
The proposed project is anticipated to cost $432,000, with no additional ongoing operating costs. 1/3 of the cost will
be reimbursed by the Village of Winnetka.
Additional costs for design engineering ($610,000) and construction ($9,000,000) are expected between 2028 -
2032. Design engineering costs will be offset by a $305,000 Invest in Cook grant award, and potential grant funding
for construction through STP and ITEP. Winnetka will reimburse 1/3 of all project costs to cover their portion of work.
TIF 14-100-5322
Phase I engineering for the Green Bay Road Redesign project, anticipated to
require 18-24 months to complete (2026-2028).
The villages of Kenilworth and Winnetka are proposing a road diet for Green Bay Road between Kenilworth and Winnetka avenues.
The work will include roadway reconfiguration, reconstruction and resurfacing, pedestrian mid-block crossing safety improvements,
corridor lighting, and streetscape improvements. In addition, the project may encompass expanded sidewalks, diagonal parking, and
bike lanes.
The Green Bay Road Enhancement Project is a critical step in activating Kenilworth’s business district and improving safety.
Kenilworth’s business corridor is uniquely narrow and only on the west side of the road. Parallel parking is available on both sides with
a single crosswalk at the Kenilworth Avenue and Green Bay Road intersection. Two lanes of traffic run in each direction of travel in
the project area. To access businesses in the corridor, pedestrians must cross four lanes of traffic without any safety control
measures.
The Village would like to reduce the number of lanes to slow traffic and add mid-block crossings to improve pedestrian safety and
reduce barriers to accessing businesses. This work would be paired with streetscape improvements, which may include expanded
sidewalks, street lighting, landscaped bump outs, and bike lanes. Beyond the safety improvements, this work will also allow the safe
transportation of bicycle and foot traffic from adjacent residential areas to the Kenilworth Metra Station, and three Pace bus stops
along Green Bay Road. This is in keeping with Cook County’s Long Range 2040 Transportation Plan that emphasizes alternative
modes of transportation, such as public transit.
The villages of Kenilworth and Winnetka entered into an agreement with Ciorba to complete the Phase I engineering in 2025 after
successful completion of the concept study in 2024. Winnetka will reimburse 1/3 of the costs associated with the work. Phase I
engineering will evaluate the feasibility of potential project concepts in coordination with IDOT to assess environmental, safety, and
traffic factors, among others. The process is intended to produce a viable concept for Phase II - design engineering. Public
engagement will incorporated into the evaluation process.
Phase II engineering will follow this step, which will then transition into construction.
Green Bay Road Enhancement Project - Phase I
Administration/Public Works
TIF $240,000 $71,410
X
$311,410
37
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
This is a two-year maintenance program. Staff will evaluate the roadways on an
annual basis to determine if further maintenance is required.
Capital Fund: 27-400-8006
Completion of Hot Mix Asphalt (HMA) patches along various section of Green
Streets Phase 1.
In 2016 the Village completed the Green Streets Phase I project. This project aimed
to address significant flooding concerns along Cumberland Avenue, Roslyn Road
and Melrose Avenue by utilizing a permeable asphalt. The material was used as a
way to allow rain water to infiltrate through the asphalt and into earth. The project
has largely been successful, however the asphalt material has shown premature
failure, resulting in potholes and raveling.
Given how recently this project was completed, it is recommended that short-term
maintenance be completed to help extend the lifespan of the roadway an additional
5-10 years, which is the typical lifespan of an asphalt road. The project will include
the removal of the most damaged areas and installation of standard HMA mix to
help create a smooth and safe ride for both cars and bikes.
In the long-term, staff will begin evaluating potential options to replace the
permeable asphalt to a more durable, while still permeable material.
Green Streets Phase 1 Maintenance
Public Works
CPF $15,000 $15,000 $30,000
38
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
The proposed projected is anticipated to cost $37,000 with no additional ongoing
operating costs.
Capital Fund: 27-400-8008
The resurfacing of Kent Road from Ridge Road to Brier Street.
In 2024, the Village hired a third party vendor to analyze the Village roads and
develop a Pavement Condition Index (PCI). These scores rate the condition of each
road to help the Village develop a long term Capital Improvement Plan. At the time,
Kent Road was in poor condition, and has continued to deteriorate. Kent Road is an
asphalt roads, which has a typical life expectancy of 20 years. If no work is done
and/or prolonged, the roadway will crumble and the cost of repair/replacement will
be much greater. The re-paving of Kent Road is planned for 2027.
Kent Road (Ridge Road to Brier Street) Grind and Overlay
Public Works
CPF $37,000 $37,000
39
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
Sidewalk replacements are an annual expense funded by the 27 fund.
A pre-existing contract with Everlast Blacktop, Inc. of Elgin, IL to perform this
work is active through FY27. Contract costs have been estimated to include
a 5% increase annually. $28,875 is requested for FY27.
Capital Fund: 27-400-8007
Annually, the Village undertakes a sidewalk replacement program to replace
sidewalk panels in poor condition.
Sidewalks are a crucial part of Kenilworth's infrastructure, as the Kenilworth
community promotes a culture of walking and biking throughout the
neighborhood. Our proximity to a Metra train station, Lake Michigan, and
district schools all necessitate the need to maintain safe sidewalk
infrastructure. Hazardous or in disrepair sidewalk squares make it more challenging
for residents and visitors to travel around the Village. By continuing
to repair damaged squares, the Village limits its liability if anyone were to
get hurt as a result of a damaged square.
Sidewalk Replacement
Public Works - Streets
CPF $28,875 $30,319 $31,835 $33,426 $35,098 $159,553
40
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
This is an annaul purchase to ensure there is adequate inventory for planned and
emergency replacements.
Capital Fund 27-700-8015
Annual Purchase of Street Light Poles, and the necessary conduit boring to set up
electrical.
The Public Works Department maintains the street light poles in the Village. Over
time, the poles begin falling into disrepair, requiring either maintenance or
replacement. Overall, the Village street lights are in good condition, however several
polls are scheduled for replacement annually to eliminate those that are falling
apart. In order to maintain an adequate inventory poles for both emergency and
planned replacements, the purchase of two poles are replacements is planned for
2027. In addition to the poles themselves, new electrical conduit is occasionally
needed to power up the light. These poles have old wiring and poor electrical
connections. When Street Lights fail, they must be installed with new electrical that
will either be tied in with a chain of other lights or directly tied into Com Ed. The
conduit/boring cost is factored into the total.
Street Light Poles
Public Works
CPF $8,250 $15,000 $6,250 $15,000 $6,250 $48,750
41
42
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
The proposed projected is anticipated to cost $105,000 with no additional ongoing
operating costs.
Capital Fund: 27-400-8008
The resurfacing and construction of curbs on the Woodstock Avenue, between
Cumnor Road and Warwick Road.
In 2024, the Village hired a third party vendor to analyze the Village roads and
develop a Pavement Condition Index (PCI). These scores rate the condition of each
road to help the Village develop a long term Capital Improvement Plan. At the time,
Woodstock Avenue between Cumnor Road and Warwick Road was in very poor
condition, and has continued to deteriorate. Woodstock Avenue is an asphalt road,
which has a typical life expectancy of 20 years. If no work is done and/or prolonged,
the roadway will crumble and the cost of repair/replacement will be much greater. In
addition to the roadway, the installation of the curbs is also recommended, as they
are either non-existent or in poor condition.
In 2022, as part of the Green Streets Phase II project, Woodstock Avenue between
Sheridan Road and Warwick Road was re-paved. In 2025, Woodstock Avenue
between Richmond Road and Cumnor Road was reconstructed and had curbs
installed. Completing this section would finalize roadwork on Woodstock Avenue for
the next 15-20 years.
Woodstock Avenue (Cumnor Road to Warwick Road) Grind and Overlay and Curbs
Public Works
CPF $105,000 $105,000
43
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
The purchase of a used CSO car is a one-time capital expense with an additional
annual maintenance expense.
Capital Project Fund 27-900-8005
The purchase of a used vehicle to replace the existing CSO vehicle.
A CSO supports routine police operations. A CSO car is essential for the CSO to
respond to non-emergency calls for service and duties such as parking complaints,
assisting with traffic control, staffing school crossings, and delivering documents to
the Skokie Courthouse.
The current CSO car, a 2015 Ford SUV, has reached the end of its useful life,
becoming increasingly less reliable and expensive to maintain. Instead of rotating a
current department squad car to the CSO car, the department will purchase a used
police car with low miles, which has more useful life than a repurposed squad car
that is closer to the end of its useful life. The new vehicle will have a secondary
purpose of being used by other Village personnel for official business when feasible.
The cost includes an estimate of the cost to upfit with emergency equipment, and
the cost of affixing a decal to the vehicle.
Community Service Officer (CSO) Used Car
Police Department
CPF $20,000 $20,000
44
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
This is a recurring annual cost associated with a multi-year contract.
General Fund: 01-900-5091
Annual fee associated with the purchase of hardware, software, and digital storage
for the department's BWC and fleet camera program (2027-2028).
Pursuant to State of Illinois statute, the Kenilworth Police Department is required to
have a BWC program. The current contract with Axon provides all hardware,
software, and data storage capacity to meet the state mandate. The current contract
will expire at the end of 2028. At that time, staff will review the contract and
recommend entering into a new contract for the above mentioned program (2029-
2031).The annual costs entered for 2029-2031 are an estimate based on a 5%
increase.
Body Worn Camera (BWC) and Fleet Camera
Police Department
GEN $16,800 $16,800 $17,700 $17,700 $17,700 $86,700
45
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
The purchase of the replacement truck is a one time expense. Annual operating
fund impact will include typical maintenance and fuel usage.
Capital Fund 27-400-8005
Purchase of a F250 truck to replace the existing 2007 F350 truck.
The Public Works Department utilizes several different vehicles in its fleet to provide
services. The current 2007 F350 is used as a versatile truck to water flowers, plow snow,
pull the trailer for asphalt work, pick up brush and a wide variety of other tasks. This vehicle
has over 80,000 miles on it, and was planned to be retired several years ago when the
2023 F250 was purchased, however was ultimately re-purposed at that time to be able to
continue to provide services.
The vehicle has many issues, including the frame work which is thin and rusted, and the
failure of the emergency brake. Given the vehicles age additional maintenance is not
recommended, but rather the replacement of it. Due to the lighter nature of the tasks
required by the vehicle, it is recommended to downsize from an F350 to F250, which offers
additional cost savings.
Once the new vehicle is purchased, the existing will be sold at auction, with an estimated
value of $4500.
F250 Truck Replacement
Public Works
CPF $52,000 $52,000
46
47
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
This is a recurring annual cost associated with a multi-year contract.
General Fund: 01-900-5091
Annual fee associated with the purchase of hardware and associated software and
training for the department's less-lethal conducted energy devices (Taser).
Police Officers are routinely faced the challenge of deescalating situations through
responses that range from the officer's presence, verbal pursuation, and on
occasion, hands-on or kinetic action. The Kenilworth Police Department deploys
Axon Taser conducted energy devices which are designed to temporarily
incapacitate a subject from a safe distance, allowing law enforcement officers to
safely restrain them reducing the likelihood of relying on higher levels of force. This
tool is intended to reduce severe injuries to both officers and subjects compared to
physical strikes, batons, or firearm discharges during arrests.
Axon Taser Conducted Energy Device
Police Department
GEN $5,200 $5,200 $5,200 $5,200 $20,800
48
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
The program is expected to be an ongoing cost until all lead service lines in the
Village have been replaced. The program is anticipated to be in place for 15+ years.
Staff anticipates the use of several funds depending on the location of the services
line to help spread the costs of the program. Anticipated funds include; TIF Fund:
14, Capital Fund: 27, and Water Fund: 35
Facilitate a cost sharing program to incentivize the replacement of lead service lines
in the Village.
In 2022, the State of Illinois adopted the Illinois Lead Service Line Replacement and
Notification Act. The Act requires several items, mainly the replacement of all lead
service lines in the Village by 2042. In 1986, the federal government banned the use
of lead in water service lines. Given the age of many homes in the Village, an
estimated 230 lead services lines remain. Due to the health concerns of lead in water,
remaining lead service lines pose a health concern to residents and their replacement
considered a priority.
To incentivize and facilitate the replacement of lead lines, the Village a cost sharing
program in April, 2026 to offset portions of the construction costs associated with the
replacement. 2027 will be the first full year of the program since it's implementation.
The Village has approximately 230 lead services lines, meaning an estimated 16
replacements a year would be required to replace all lines by 2042. Over the life of
the program, it is estimated to have a total cost of approximately $1.45 million.
Lead Service Line Cost Sharing Program
Administration & Public Works
TIF, CPF,
WTR
$90,000 $90,000 $90,000 $90,000 $90,000 $450,000
49
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
The proposed project is anticipated to cost $70,000 over three years. No ongoing
operating expenses are expected after the completion of the maintenance.
Water Fund: 35-100-5048
Rehabilitation work on the Pressure Reduction Valve Pit on Abbotsford Road and
Ivy Court.
The pressure reduction valve is a critical component of the water system, providing the Village
with water security. If Wilmette water is unable to meet our demand, the PRV connection with
Winnetka provides our Village with water as needed. If the pressure drops below 35 PSI, the
Valve opens and provides Kenilworth with water until the pressure reaches 35 PSI.
Currently, the state of the steel underground structure is in poor condition. The steel is exposed
and rusting from salt and extreme moisture. In order to preserve the structure, necessary
maintenance would include the removal of large amounts of rust and repainting the interior of
the structure. The Village worked with its engineer to develop a maintenance plan, splitting key
projects across three years.
Year 1: Replacement of station lid, to prevent further water infiltration
Year 2: Replacement of rusted check valve, butterfly valve, spool
Year 3: Painting of the station, and floor repair
If properly rehabbed, the Village will prolong the life of the structure. Installation of a new
structure would cost an estimated $500,000. This cost saving is vital and important to the
Village.
PRV Station Maintenance
Public Works
WTR $20,000 $25,000 $25,000 $70,000
50
51
FY 2028-2031
Proposed Capital Projects
52
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
Funding for this program comes out of the General Fund. Funding is not slated for
FY27.
General Fund: 01-600-5767
Removal and trimming of trees on Village properties.
Tress planted on Village properties are trimmed on a three-year cycle in the winter months.
Trimming/pruning trees in the winter is best for the health of the tree. The three-year cycle in place
allows for the work, and cost, to be spaced out.
Trees are trimmed and pruned to maintain their long-term health. Trimming and pruning in the winter
is ideal for the trees, as invasive bugs and diseases are dormant and less likely to infect the tree as it
heals from the trimming.
Village Property Tree Trimming Program
Public Works
GEN $5,500 $6,100 $11,600
53
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
The proposed project is anticipated to cost $400,000, with no additional ongoing
operating costs.
Capital Fund: 27-300-8007
Replace of the Public Works building asphalt shingle roof.
The Public Works Facility was built in 2000, and is a vital piece of infrastructure that
houses a variety of Village assets, including vehicles and essential inventory items.
The facility roof was built using asphalt shingles that are now 25 years old. The
typical life expectancy of asphalt architectural shingles is 20-30 years. The shingles
are starting to fail, and beginning to curl and become loose. Public works staff has
completed several in house repairs over the past several years.
The planned removal and replacement of the asphalt shingles is scheduled for
2029. This is a critical project, as it ensures the building and everything it houses is
properly protected. The replacement of the shingles will prevent future damage and
prevent the need for a full roof replacement.
Public Works Roof Replacement
Public Works
CPF $400,000 $400,000
54
55
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
This project has no impact on the operating fund.
Capital Fund: 27-300-8007
The resurfacing of the Village Hall/Police Department parking lot.
The Village Hall parking lot is an asphalt lot. It has been seal coated multiple times
(2018, 2022, 2025) to extend its life expectancy of 20 years. A grind and overlay will
be justified for 2029, as additional seal coats will not repair existing or prevent future
damage to the top layer of the asphalt. Without a grind and overlay by 2029, the
parking lot will crumble and the cost of repair/replacement will be much greater.
Village Hall Parking Lot Grind & Overlay
Public Works
CPF $40,000 $40,000
56
57
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
The purchase of a firewall is a recurring cost as the equipment ages and requires
replacement, however does not have an impact on the annual operating fund.
Capital Fund: 27-100-8004
Planned replacement of Village firewall equipment.
The Village utilizes two firewalls to protect the Village network. Most firewalls have a
typical lifespan of 5-7 years before requiring replacement. In order to ensure the
Village's equipment remains up to date, the continued replacement of the aging
equipment is required. On an annual basis, the Village reviews the condition of its
equipment to determine its status.
The next scheduled replacement is for 2028. Firewalls are an important piece of the
overall Village IT system, that acts as a barrier between the internal network and un-
trusted external networks, protecting the system against outside cyber attackers.
Firewall
Adminstration
CPF $5,565 $5,845 $11,410
58
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
This is a one-time expense, which will not impact the operating fund annually. Once
purchased, the Server is not expected to require replacement within the next five
years.
Capital Fund: 27-100-8004
The purchase and replacement of the Villages network server.
The Villages network server is a critical piece of IT infrastructure, housing all the
Villages files, applications, software, etc. The typical lifespan of a server is 5-7
years. The Village last upgraded its server in 2021, which is now reaching end of
life. The planned replacement of the server is scheduled for 2028. Staff is currently
working with its IT vendor to determine if reductions can be made to the on-premise
ecosystem, reducing the overall server costs.
Network servers function as the central hub in the network, managing
communication and data exchange between different devices. The continued
maintenance and replacement of the Village's server is critical in ensuring day-to-
day operations of the Village.
Network Server Replacement
Administration
CPF $40,000 $40,000
59
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
The purchase of a network switch is a recurring cost as the equipment ages and
requires replacement. Moving forward, it is expected that a network switch will need
to be replaced every couple of years.
Capital Fund: 27-100-8004
The purchase and installation of a new network switch.
The Village utilizes eight network switches for various IT functions. Most switches
have a typical lifespan of 5-10 years before requiring replacement. In order to
ensure the Village's equipment remains up to date, the continued replacement of
the aging equipment is required. On an annual basis, the Village reviews the
condition of the switches to determine their status. Since 2025, the Village has
replaced 3 switches. It is currently anticipated that one switch will need to be
replaced over the next five year, currently planned for 2030.
Network switches are an important piece to the overall Village IT system,
connecting multiple devices within single network, allowing them to communicate
efficiently. The upgrade of network switches will ensure the Village's system
continues to operate at optimal levels and up to date with necessary security
features.
Network Switch
Administration
CPF $3,824 $3,824
60
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
The migration itself is a one-time capital expense. The ongoing storage of files with
incur an annual expense, pending the size of the data that is migrated.
Capital Fund 27-100-8003
The migration of the Village's on-premise file server to Microsoft SharePoint.
Currently, the Village hosts its main file server on-premise, meaning the equipment
and data are physically located on site. Under the current model, only one person is
able to work on a document at a time, and must be physical on site, or signed in
through the VPN to be able to access the documents.
This limits staff ability to access the system offsite, as well as Village contractors who
are not onsite everyday. Using SharePoint offers numerous benefits, inlcuding
enhanced collaboration, and improved accessibility. SharePoint allows multiple users
to work on documents simultaneously, and is accessible from anywhere with Internet
access, supporting remote and mobile work. Additionally, SharePoint integrates with
other Microsoft 365 tools, helping streamline document management and increase
productivity.
Through the upgrade, the Village will eliminate access issues, as well as potentially
reduce the amount IT equipment needed to host the service on site. This will help
reduce the Village ongoing IT infrastructure and maintenance costs.
Sharepoint Migration
Administration
CPF $30,000 $30,000
61
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
The program is completed on an as-needed basis, with no additional ongoing
operating cost.
Capital Fund: 27-400-8006
As-needed tuck pointing of bridge decks throughout the Village.
The Village has three limestone bridge deck walls on Abbotsford Road, Melrose
Avenue, and Sheridan Road. The bridge deck walls are decorative and require
maintenance to keep their beauty and structural integrity. The bridge deck walls
have mortar joints that occasionally fail over time due to rain, ice, and salt. As part
of a maintenance program, staff annual inspects the bridge decks. It is
recommended to perform tuck pointing on them every three years, or an an as-
needed basis to prevent complete failure and collapse of the walls. The next
scheduled maintenance is planned for 2029.
Tuck Point Bridge Decks
Public Works
CPF $7,000 $7,000
62
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
The proposed projected is anticipated to cost $30,000 with no additional ongoing
operating costs.
Capital Fund: 27-400-8008
The resurfacing of Cummings Avenue from Ridge Road to Brier Street.
In 2024, the Village hired a third party vendor to analyze the Village roads and
develop a Pavement Condition Index (PCI). These scores rate the condition of each
road to help the Village develop a long term Capital Improvement Plan. At the time,
Cummings Avenue was in poor condition, and has continued to deteriorate.
Cummings Avenue is an asphalt road, which has a typical life expectancy of 20
years. If no work is done and/or prolonged, the roadway will crumble and the cost of
repair/replacement will be much greater.
The re-paving of Cummings Avenue is planned for 2030. The roadway will be
evaluated on an annual basis to determine if the timing of the project should be
moved forward.
Cummings Avenue (Ridge Road - Brier Street) Grind and Overlay
Public Works
CPF $30,000 $30,000
63
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
The proposed projected is anticipated to cost $65,000 with no additional ongoing
operating costs.
Capital Fund: 27-400-8008
The resurfacing of Essex Road from Kenilworth Avenue to Oxford Road
In 2024, the Village hired a third party vendor to analyze the Village roads and
develop a Pavement Condition Index (PCI). These scores rate the condition of each
road to help the Village develop a long term Capital Improvement Plan. At the time,
Essex Road was in poor condition, and have continued to deteriorate. Essex road is
an asphalt road, which has a typical life expectancy of 20 years. If no work is done
and/or prolonged, the roadway will crumble and the cost of repair/replacement will
be much greater.
The re-paving of Essex Road is planned for 2031. The roadway will be reviewed on
an annual basis to determine if its re-paving should be moved up.
Essex Road (from Kenilworth Avenue to Oxford Road) Grind and Overlay
Public Works
CPF $65,000 $65,000
64
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
Grant funding was received through the Invest in Cook grant to offset $305,000 of
the total cost, which is expected to be $610,000. Winnetka will be responsible for 1/3
of this amount. Future construction work is anticipated to be roughly $9,000,000.
Grant funding through STP and ITEP will be sought to for that scope of work.
TIF 14-100-5322
Phase II engineering for the Green Bay Road Redesign project, anticipated to require
18-24 months to complete (2028-2029).
Goal - Enhanced Resident Experiences, Objective 2 - Continue to Implement the Vision
for Green Bay Road Corridor, Action 1 - Phase II Engineering - design of streetscape,
parking, and traffic flow improvements in coordination with the Village of Winnetka.
The villages of Kenilworth and Winnetka are proposing a road diet for Green Bay Road between Kenilworth and
Winnetka avenues. The work will include roadway reconfiguration, reconstruction and resurfacing, pedestrian mid-
block crossing safety improvements, corridor lighting, and streetscape improvements. In addition, the project may
encompass expanded sidewalks, diagonal parking, and bike lanes.
The Green Bay Road Enhancement Project is a critical step in activating Kenilworth’s business district and improving
safety. Kenilworth’s business corridor is uniquely narrow and only on the west side of the road. Parallel parking is
available on both sides with a single crosswalk at the Kenilworth Avenue and Green Bay Road intersection. Two lanes
of traffic run in each direction of travel in the project area. To access businesses in the corridor, pedestrians must
cross four lanes of traffic without any safety control measures.
The Village would like to reduce the number of lanes to slow traffic and add mid-block crossings to improve pedestrian
safety and reduce barriers to accessing businesses. This work would be paired with streetscape improvements, which
may include expanded sidewalks, street lighting, landscaped bump outs, and bike lanes. Beyond the safety
improvements, this work will also allow the safe transportation of bicycle and foot traffic from adjacent residential
areas to the Kenilworth Metra Station, and three Pace bus stops along Green Bay Road. This is in keeping with Cook
County’s Long Range 2040 Transportation Plan that emphasizes alternative modes of transportation, such as public
transit.
The villages of Kenilworth and Winnetka entered into an agreement with Ciorba to complete both the concept study
and Phase I engineering. Design engineering will be the next step in the process following the establishment of a
concept and scope of work. Once plans are developed during this step (Phase II) construction is expected to follow.
Green Bay Road Enhancement Project - Phase 2 Design Engineering
Administration / Public Works
TIF $305,000 $305,000
X
$610,000
65
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
Future construction work is anticipated to be roughly $9,000,000. Grant funding
through STP and ITEP will be sought to for that scope of work. Winnetka will be
responsible for 1/3 of this amount to cover their portion of work.
TIF 14-100-5322
Construction (Phase III) for the Green Bay Road Redesign project, anticipated to
require 12-36 months to complete (2030-2032).
Goal - Enhanced Resident Experiences, Objective 2 - Continue to Implement the
Vision for Green Bay Road Corridor, Action 1 - Construction - potential streetscape,
parking, and traffic flow improvements in coordination with the Village of Winnetka.
The villages of Kenilworth and Winnetka are proposing a road diet for Green Bay Road between Kenilworth and
Winnetka avenues. The work will include roadway reconfiguration, reconstruction and resurfacing, pedestrian mid-block
crossing safety improvements, corridor lighting, and streetscape improvements. In addition, the project may encompass
expanded sidewalks, diagonal parking, and bike lanes.
The Green Bay Road Enhancement Project is a critical step in activating Kenilworth’s business district and improving
safety. Kenilworth’s business corridor is uniquely narrow and only on the west side of the road. Parallel parking is
available on both sides with a single crosswalk at the Kenilworth Avenue and Green Bay Road intersection. Two lanes
of traffic run in each direction of travel in the project area. To access businesses in the corridor, pedestrians must cross
four lanes of traffic without any safety control measures.
The Village would like to reduce the number of lanes to slow traffic and add mid-block crossings to improve pedestrian
safety and reduce barriers to accessing businesses. This work would be paired with streetscape improvements, which
may include expanded sidewalks, street lighting, landscaped bump outs, and bike lanes. Beyond the safety
improvements, this work will also allow the safe transportation of bicycle and foot traffic from adjacent residential areas
to the Kenilworth Metra Station, and three Pace bus stops along Green Bay Road. This is in keeping with Cook County’s
Long Range 2040 Transportation Plan that emphasizes alternative modes of transportation, such as public transit.
The villages of Kenilworth and Winnetka entered into an agreement with Ciorba to complete both the concept study and
Phase I engineering. Design engineering (Phase II) will be the next step in the process following the establishment of a
concept and scope of work. Construction is expected to follow. The Village plans to apply for ITEP and STP funds to
secure additional funds for construction.
Green Bay Road Enhancement Project - Phase 3 Construction
Administration / Public Works
TIF $9,000,000
X
$9,000,000
66
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
The proposed projected is anticipated to cost $904,00 with no additional ongoing
operating costs. Staff is exploring potential grant opportunities to help fund the
project, as well phasing the project to reduce impact.
MFT and CIP Fund
The construction of curbs and reconstruction of the roadway on Oxford Road (from
Woodstock Avenue to Sheridan Road).
Oxford Road is rated as having one of the worst road conditions in the Village. In
addition, Oxford Road does not currently have concrete curbs, instead residents have
individually installed boulders or railroad ties to identify the curb line. As a result of the
these factors, Oxford Road experiences drainage issues during heavy storm events,
as stormwater is not properly directed to catch basins. While a grind and overlay
would provide a better road surface and appearance, it would not help address the
larger drainage issues in the area. By incorporating the installation of curbs, this
project will help address long standing drainage issues on Oxford Road, as well as
further reducing the number of streets that do not have any curbs. The installation of
curbs will also help extend the lifespan of the new roadway, as it reinforces the
pavements edges, and manages the stormwater runoff.
In 2026, the Village begin design engineering work, to ensure the project was built in
a way to address the ongoing issues. The design is expected to be complete by the
end of 2026 or early 2027. The project is planned for 2028 to allow for additional time
for the MFT Fund to grow.
Oxford Road (Woodstock Avenue to Sheridan Road) Curbs & Road Reconstruction
Public Works
CPF $904,000 $904,000
67
68
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
The proposed projected is anticipated to cost $120,000 with no additional ongoing
operating costs.
Capital Fund: 27-400-8008
The resurfacing and construction of curbs on the West bound lane of Park Drive
from Green Bay Road to Ridge Road.
In 2024, the Village hired a third party vendor to analyze the Village roads and
develop a Pavement Condition Index (PCI). These scores rate the condition of each
road to help the Village develop a long term Capital Improvement Plan. At the time,
the West bound lane of Park Drive was in fair condition, and has continued to
deteriorate. Park Drive is an asphalt road, which has a typical life expectancy of 20
years. If no work is done and/or prolonged, the roadway will crumble and the cost of
repair/replacement will be much greater. In addition to the roadway, the replacement
of the curbs is also recommended, as they are in poor condition.
In 2023, the East bound lane of Park Drive was re-paved, and new curbs were
installed. In 2022, the watermain on Park Drive (located on the W. Bound lane side)
was replaced between Sterling Road and Ridge Road. The remainder of the
watermain (Sterling Road - Green Bay Road) is planned for 2029. Once complete, the
roadway and curbs can be replaced as well, completing the major infrastructure
needs in that area for the next 15-20 years.
Park Drive (W. Bound Lane, Green Bay Road to Ridge Road)) and Overlay and Curbs
Public Works
CPF $120,000 $120,000
69
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
The proposed projected is anticipated to cost $120,000 with no additional ongoing
operating costs.
Capital Fund: 27-400-8008
The resurfacing of Robsart Road and Abingdon Avenue.
In 2024, the Village hired a third party vendor to analyze the Village roads and
develop a Pavement Condition Index (PCI). These scores rate the condition of each
road to help the Village develop a long term Capital Improvement Plan. At the time,
both Robsart Road and Abingdon Avenue were in poor condition, and have
continued to deteriorate. Both roads are asphalt roads, which has a typical life
expectancy of 20 years. If no work is done and/or prolonged, the roadway will
crumble and the cost of repair/replacement will be much greater.
The re-paving of Robsart Road and Abingdon Avenue is planned for 2028.
Robsart Road and Abingdon Avenue Grind and Overlay
Public Works
CPF $120,000 $120,000
70
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
The purchase of the replacement truck is a one time expense. Annual operating
fund impact will include typical maintenance and fuel usage.
Capital Fund: 27-400-8005
Purchase of a replacement F550 Utility Dump Truck.
The Public Works Department utilizes several different vehicles in its fleet to provide
services. The current 2013 F550 Utility Dump Truck is in fair condition, with 34,000 miles.
The truck is used for several day to day operations including but not limited to, water main
breaks, concrete work, snow and ice removal and hauling various materials. The F550 is a
critical piece of equipment, as it is the main plow truck for snow removal operations on the
east side of Green Bay Road.
Plowing and salting operations take a heavy toll on the vehicle. While still overall in fair
condition, due to regular maintenance performed by staff, the planned replacement of the
vehicle is scheduled for 2030 to ensure the Village gets as much value out of it as possible.
Once the new vehicle is purchased, the existing will be sold at auction, with a current
estimated value of $18,000.
F550 Utility Dump Truck Replacement
Public Works
CPF $85,000 $85,000
71
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
The purchase of the replacement backhoe is a one time expense. Annual operating
fund impact will include typical maintenance and fuel usage.
Capital and Water Fund
The purchase of a replacement Backhoe.
Currently the Village utilizes a 1995 LB110 New Holland Combination machine to
excavate water and sewer breaks, remove fallen trees, replace road sections, repair
catch basins, load spoil, load salt along with a variety of other activities. The
backhoe is a critical piece of equipment for Public Works operations. Over the past
several years, the vehicle has had several break downs, requiring expensive
maintenance to get the machine running again. Most recently, while the machine
was out for service, Public Works had to rely on neighboring communities to utilize
their equipment to help perform necessary service, which would not be possible
without the machine. Due to the age of the tractor and its importance to day to day
operation it is recommended to be replaced in 2029.
The current tractor was purchased as a used piece of equipment, which offered cost
savings. Staff will evaluate whether it is more practical to purchase a new or used
machine.
New Holland Backhoe Replacement
Public Works
CPF
WTR
$150,000
X
$150,000
72
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
The purchase of police radios is a capital expense that reoccurs when current radios
are at the end of their useful life.
Capital Fund 27-900-8002
The purchase of 12 new portable Motorola Starcom radios.
Portable police radios are essential for police operations and are necessary for
officers to be dispatched to calls for service, communicate, and coordinate with
central dispatch and neighboring police agencies.
Portable radios are replaced as their useful life comes to an end and the radio is no
longer technologically supported by the manufacturer. As the current radios begin to
reach the end of their life, staff will evaluate its replacement options.
Police Radios
Police
CPF $115,000 $115,000
73
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
The purchase of a new squad car is a one-time capital expense with an additional
annual maintenance expense.
Capital Fund: 27-900-8005
The purchase of a new squad car to replace one that has reached the end of its
useful life.
Police squad cars are essential to patrol operations and public safety. Squad cars
are used for routine patrol, responding to routine calls for service and emergencies,
and deploying equipment that allows officers to handle a wide array of public safety
situations.
The useful life of a squad car for patrol operation in the village is approximately
80,000 miles. At that point the routine wear and tear of the demands patrol
operations results in diminishing reliability and increasing repair and maintenance
costs. The cost includes an estimate of the cost to upfit with emergency equipment,
and the cost of striping the new vehicle.
Police Squad Car
Police Department
CPF $63,000 $63,000
74
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
Once replaced, the water meters themselves will not carry an annual operating fund
impact, as the new equipment will be under warranty. The MDMS will carry an
annual maintenance cost. The Village currently pays approximately $11,000
annually to its current MDMS provider (Aclara).
Water Fund
The replacement of all water meters in the Village.
In 2009, the Village completed a system-wide water meter replacement program. The
current water meters have a typical lifespan of 15-20 years, and are nearing end-of-life.
As meters reach end-of-life, their accuracy becomes less dependable, potentially
resulting in increased amounts of unbilled water.
To prepare for their eventually replacement, Public Works will be bench-testing 20 older
meters from the system to check their current accuracy levels. If the meters are still
performing at a high level, the system-wide replacement may be able to be delayed a
couple of years, however, at this time it is expected to be required within the next 3-10
years.
When replacement is required, it will entail the replacement of the Village approximately
880 water meters. In addition, depending on which vendor is awarded the project,
additional IT infrastructure may be required to be replaced, such as Meter Data
Management System (MDMS). The MDMS allows the Village to track the usage of each
customer in hourly intervals and is subsequently uploaded to generate quarterly bills.
Water Meter Replacement Program
Public Works
WTR $540,000 $540,000
75
Water Meter System Infrastructure
MDMS
Water Meter MTU
76
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
This is a one-time expense, which will not impact the operating fund annually.
Water Fund
Design engineering and construction for the replacement of the water main on
Green Bay Road, from Park Drive to the North Village limit.
In 2018, the Village had a Water System Assessment prepared by Stanley Consultants
which provides recommendations on how the Village should prioritize replacement based
on the system’s hydraulics, age, and approximate costs. The replacement of the water
mains on Green Bay Road was identified as a recommended replacement within the
report. The existing water main on Green Bay Road is over 60 years old and has a
diameter of 6". This has resulted in a reduction of water pressure to the fire hydrants in the
area. By completing the replacement and upgrade to an 8" water main, the Village is
replacing an aging piece of infrastructure and ensuring the fire hydrants in that area have
the adequate flow rate for emergency use. In addition, there an estimated 17 lead service
lines in the project area, which will be replaced as a result of this project.
In 2020, the Village had a preliminary design of the replacement completed, however did
not proceed to finalize drawings as funding was not available. With the ongoing Green Bay
Road Enhancement Project, it will be imperative that the water main be replaced ahead of
or during the project to avoid impacting streetscape improvements after completion. The
project is currently planned for 2030, and will require finalizing design work prior to
construction.
Water Main Replacement (Green Bay)
Public Works
WTR $2,000,000 $2,000,000
77
78
CAPITAL IMPROVEMENT PROJECT PROFILE
Capital Project
IT/Capital Purchase
Capital Maintenance
DEPARTMENT:
TOTAL PROJECT COST:
PROJECT TITLE:
PROJECT DESCRIPTION:
PROJECT
JUSTIFICATION AND
BENEFIT:
OPERATING FUND
IMPACT:
FUNDING SOURCE(S):
CATEGORY:
Funding
Source
2027 2028 2029 2030 2031 Total
This is a one-time expense, which will not impact the operating fund annually.
Water Fund
Design engineering and construction for the replacement of the water main on Park
Drive, from Green Bay Road to the Sterling Road.
In 2018, the Village had a Water System Assessment prepared by Stanley Consultants
which provides recommendations on how the Village should prioritize replacement based
on the system’s hydraulics, age, and approximate costs. The replacement of the water
main on Park Drive was identified as a recommended replacement within the report. The
existing water main on Park Drive is over 50 years old and has a diameter of 6". This has
resulted in a reduction of water pressure to the fire hydrants in the area. By completing the
replacement and upgrade to an 8" water main, the Village is replacing an aging piece of
infrastructure and ensuring the fire hydrants in that area have the adequate flow rate for
emergency use. In addition, there an estimated 9 lead service lines in the project area,
which will be replaced as a result of this project.
In 2020, the Village had a preliminary design of the replacement completed, however did
not proceed to finalize drawings as funding was not available. In 2022/2023, the section of
water main on Park Drive between Sterling Road and Ridge road was replaced. Completing
this section will finalize any water related work in the area for the foreseeable future, as well
as allow the repaving and curb work on the West Bound Lane of Park Drive. The project is
currently planned for 2029, and will require finalizing design work prior to construction.
Water Main Replacement (Park Drive)
Public Works
WTR $415,650 $415,650