There will be a regular meeting of the Village Board of Trustees at Village Hall, 419 Richmond
Road; Kenilworth, IL. The public may attend in person or by utilizing the following link:
TEAMS MEETING LINK
If you do not have access to a computer, you may attend via telephone:
+1 872-242-8055
Meeting ID: 367 426 229#
Village Board of Trustees
Meeting Agenda
January 20, 2026 at 7:00 p.m.
I. Call to Order / Roll Call
II. Approval of Minutes
A. Village Board – December 9, 2025
B. Village Board – December 9, 2025 Executive Session
III. Village President’s Report
A. Beach Construction Update (Bulley and Andrews)
IV. Approval of the Warrant List
V. Regular Scheduled Business
A. Items for Consideration by Omnibus Vote
1. Resolution Authorizing the Use of the Municipal Partnering Initiative (MPI)
Contractual Pricing Pursuant to Government Joint Purchasing Act, 30 ILCS
525/0.01, et. seq., with Advanced Tree Care for the 2026 Tree Trimming
Program in the Amount of $25,000
2. Resolution Authorizing Execution of an Easement Agreement with
Commonwealth Edison for a Relocated Vault Near 604 Green Bay Road
B. Items for Discussion
3. Presentation and a Resolution to Accept Planning Technical Assistance Services
Delivered by the Chicago Metropolitan Agency for Planning
Village of
1
The Village of Kenilworth is subject to the requirements of the Americans with Disabilities Act of 1990. Individuals with disabilities who plan to
attend this meeting and who require certain accommodations in order to allow them to observe and/or participate in this meeting or who have
questions regarding the accessibility of the meeting or the facilities are requested to contact Kathy Thake at 847-251-1666 promptly to allow the
Village to make reasonable accommodations for those persons.
4. Action on the Following Items Pertaining to a Request for a Planned Unit
Development at 515-519 Park Drive:
a) Public Hearing to Consider a Certificate of Appropriateness
b) Ordinance Granting a Special Use Permit to RED3 Development
LLC for a Preliminary Planned Unit Development and Approving a
Certificate of Appropriateness
VI. Report from Staff
A. Community Development
B. Finance
C. Police
D. Public Works
E. Legal Counsel
F. Village Manager
VII. Business from the Public
VIII. Adjourn
2
VILLAGE OF 1
2
3
KENILWORTH, IL 4
5
Village Board of Trustees 6
Meeting 7
December 9, 2025 8
9
Call to Order 10
11
President Kaz called to order the meeting of the Board of Trustees of the Village of Kenilworth at 5:00 p.m. on 12
December 9, 2025. 13
14
Roll Call 15
16
President Kaz requested a roll call, and the results were as follows: 17
18
Trustees: 19
Trustee Tim Ransford Present 20
Trustee Christopher Ottsen Present Remote, Voting* 21
Trustee Amy Hannus Present 22
Trustee John Gottschall Absent 23
Trustee Matthew Lojkovic Present 24
Trustee Joseph Vitu Present 25
President Cecily Kaz Present 26
27
*President Kaz indicated that she was in receipt of a request from Trustee Ottsen to attend the meeting 28
electronically in accordance with the Electronic Meeting Attendance Policy. As a quorum physically present, 29
the Trustees will be authorized to attend electronically unless a motion is made and passed by a two-thirds 30
majority of those physically present to deny the request. Hearing no such motion, President Kaz deemed the 31
Trustee Present as a voting member. 32
33
A quorum was present in person. 34
35
Others Recorded as in Attendance: 36
Village Officials and Staff: 37
Michael Gagnon Village Clerk 38
Kathy Thake Village Manager 39
Donicio Silva Village Police Chief (Acting) 40
Jordan Schmidt Management Analyst 41
Molly Burns Management Analyst 42
V
V
I
L
L
A
G
E
O
F
V
I
L
L
A
G
E
O
F
l
l
a
g
e
o
f
3
1
Others, signing in as displayed in Participant List: 2
3
Carol Brobeck 4
Michael Blue 5
Lori Stanley 6
Martin C. 7
Margie Zander 8
David Joyce 9
Jeanne Keiler 10
11
Approval of Minutes 12
13
President Kaz asked if there any questions or comments regarding the following minutes: 14
15
A. Committee of the Whole – November 5, 2025 16
B. Committee of the Whole – November 5, 2025 Executive Session 17
C. Village Board – November 17, 2025 18
D. Village Board – November 17, 2025 Executive Session 19
20
Hearing none, President Kaz then asked for a motion to approve the minutes as presented. Trustee Hannus 21
so moved, and Trustee Lojkovic seconded the motion. 22
23
A roll call vote was taken as follows: 24
25
For: Ransford, Ottsen, Hannus, Lojkovic, Vitu 26
27
Opposed: None 28
29
The roll call tally was five votes in favor, and none opposed. President Kaz declared the minutes approved. 30
31
Village President’s Report 32
33
President Kaz had no formal report to give but took the opportunity to thank Village staff for their 34
professional response to unseasonally heavy snowfall. 35
36
Approval of the Warrant List 37
38
In the absence of Finance Committee Chair Gottschall, President Kaz asked Village Manager Thake to report 39
on the Warrant List. She highlighted Class A warrant payments for work on the ongoing Lakefront 40
Improvement Project (LIP) and recent roadway paving work. Trustees clarified a payment made to 41
Woodhouse Tinucci related to the LIP, and the procurement procedure followed for the paving work. 42
Manager Thake addressed these questions to the Board’s satisfaction. She described Class B payments as 43
payroll related. 44
45
4
Hearing no further comments from the Board, President Kaz asked for a motion to approve the warrants as 1
presented. Trustee Vitu so moved, and Trustee Lojkovic seconded the motion to approve the Class A warrants 2
in the amount of $1,001,452.40 and to ratify the Class B warrants in the amount of $159,838.27. 3
4
A roll call vote was taken as follows: 5
6
For: Ransford, Ottsen, Hannus, Lojkovic, Vitu 7
8
Opposed: None 9
10
The roll call tally was five votes in favor, and none opposed. President Kaz declared the warrants approved 11
and ratified. 12
13
Regular Scheduled Business 14
15
President Kaz began consideration of Regular Scheduled Business by reading Items for Consideration by 16
Omnibus Vote aloud as follows: 17
18
A. Items for Consideration by Omnibus Vote 19
1. Appointment of Donicio Silva as Chief of Police to be Effective January 1, 2026 20
21
2. Adoption of the following Ordinances Abating the Tax Heretofore Levied for Tax Year 2025 22
to Pay the Principal and Interest on General Obligation Refunding Bonds: 23
a) Series 2015A Abatement 24
b) Series 2022 Abatement 25
26
3. Adoption of the Following Items Related to the 2025 Tax Levy for the Village Fiscal Period 27
January 1, 2026 through December 31, 2026: 28
a) An Ordinance for the Levy Assessment and Collection of Taxes for the Village 29
b) A Resolution Limiting the Additional Tax Levy Extension for Loss and Cost to Two 30
Percent 31
32
4. Adoption of an Ordinance Amending the Fiscal Year 2025 Budget 33
34
5. Authorization to Set the 2026 Compensation for the Village Manager and Police Chief 35
36
6. Resolution Authorizing a Contractual Agreement with Axon Enterprise, Inc., and the 37
Purchase of Five (5) Taser 10 Conducted Energy Weapons in a Total Amount of $25,968.85 38
39
7. Resolution Authorizing the Purchase and Contractual Agreement for Bulk Road Salt for the 40
2026 Winter Season with Compass Minerals America, Inc., of Orland Park, Kansas Through 41
the State of Illinois Joint Purchasing Program in an Amount Not to Exceed $20,275.20 42
43
5
8. Resolution Authorizing a Contractual Agreement with BS&A Software, LLC of Bath, 1
Michigan for Enterprise Resource Planning Software System Cloud Integration in the 2
Amount not to Exceed $30,600 3
4
She then asked whether there were any questions from the Board and whether any members of the Board 5
would like to remove any items from Omnibus Vote consideration. There were no requests to remove items. 6
Trustees asked for clarification that there were no changes made to Item #4: Adoption of an Ordinance 7
Amending the Fiscal Year 2025 Budget, subsequent to prior public discussions and Board approvals, and asked 8
for a review of the terms for Item #3: Adoption of the Following Items Related to the 2025 Tax Levy for the 9
Village Fiscal Period January 1, 2026 through December 31, 2026. Manager Thake clarified Item #4 and 10
reviewed Item #3 to the Board’s satisfaction. 11
12
Hearing no further questions or comments, President Kaz then took the opportunity to recognize Acting Chief 13
Donicio Silva, who was in attendance, and underscore the Village’s pleasure at his pending appointment to 14
permanent Police Chief status. She then asked for a motion to approve the items as presented. Trustee 15
Ransford so moved, and Trustee Hannus seconded the motion. 16
17
A roll call vote was taken as follows: 18
19
For: Ransford, Ottsen, Hannus, Lojkovic, Vitu 20
21
Opposed: None 22
23
The roll call tally was five votes in favor, and none opposed. President Kaz declared the appointment made 24
and the ordinances, resolutions and compensation adopted and authorized. The Board took time to 25
congratulate Chief Silva on his appointment. 26
27
President Kaz then turned to Items for Consideration by Individual Vote. 28
29
B. Items for Consideration by Individual Vote 30
1. Adoption of the Following Ordinances Pertaining to the Annual Fee Schedule: 31
a) An Ordinance Amending Chapter 90 of the Village Code Concerning the Implementation 32
of Fees 33
b) Adoption of the Annual Fee Ordinance with an Effective Date of January 1, 2026 34
35
President Kaz recognized Management Analyst Molly Burns as a presenter on this item. Ms. Burns reviewed 36
the stipulations that were included in Item 1a and provided a brief overview of the Annual Fee Ordinance 37
generally referred to in Item 1b. Trustees asked for clarification of the terms of the Building Permit 38
Technology Fee. Ms. Burns responded to the Board’s satisfaction. President Kaz opened the floor for 39
questions from the public. There were none. With no further questions from the Board or the public, 40
President Kaz asked for a motion to approve the item #1 as submitted. Trustee Lojkovic so moved. Trustee 41
Hannus seconded the motion. 42
43
A roll call vote was taken as follows: 44
45
For: Ransford, Ottsen, Hannus, Lojkovic, Vitu 46
47
6
Opposed: None 1
2
The roll call tally was five votes in favor, and none opposed. President Kaz declared the ordinances adopted. 3
4
President Kaz then asked Trustee Hannus to introduce a Zoning Code Update Presentation from Teska 5
Associates. Trustee Hannus reviewed the recent activity that took place as the Village proceeds to update its 6
zoning code and introduced Ms. Carol Brobeck and Mr. Michael Blue from Teska Associates. Ms. Brobeck 7
began by describing a recent open house conducted on November 4, 2025, as well as an online survey, open 8
to the public, developed by Teska to promote community engagement in the zoning code update process. 9
These efforts elicited topics important to residents such as business district design guidelines, signage codes, 10
residential driveway and parking considerations, and procedural enhancements to make zoning review 11
simpler and more effective. Trustees discussed common problems with the existing zoning review process, 12
prior attempts to update the zoning process, and the roles filled by the Plan Commission and the Architectural 13
Review Board. 14
15
Ms. Brobeck then proposed a new organization of the zoning code under the following headings: 1.) Title & 16
Purpose, 2.) Rules & Definitions, 3.) General Provisions, 4.) Zoning Districts & Zoning Maps, 5.) Administration 17
/ Planned Unit Developments, 6.) Off-street Parking & Loading Regulations, 7.) Nonconformities, 8.) Sign 18
Code, 9.) Business District Design Guidelines. She then went on to review the proposed zoning code changes 19
among those headings relating to pools, outdoor kitchens, accessory structures, the review committee 20
structure relative to approval of Certificates of Appropriateness (COA), the Plan Commission and Village Board 21
approval process, the combination of existing minor zoning districts, creating categories for zoning uses, 22
expanding existing floor credits, revising Substantial Alteration regulations, revising business district design 23
guidelines, and rewriting the sign code to be content-neutral. Trustees clarified the hierarchy of zoning 24
approval jurisdiction, and the concept of setback regulations. 25
26
Ms. Brobeck then listed policy questions still under consideration around how best to regulate bulk at upper 27
stories in residential districts, whether a maximum width of driveways, measured at the property 28
line/sidewalk, is appropriate, and what regulations may be useful to encourage appropriate signage in the 29
business district. She updated the Board on recent legislative changes that will prohibit a Village’s ability to 30
impose or enforce minimum parking requirements in proximity of a public transportation hub or corridor, and 31
presented a chart describing the approval structure among the Zoning Board of Appeals (ZBA), the Plan 32
Commission (PC), the Architectural Review Commission (ARC) and the Village Board (VB) that would result 33
once presently recommended changes are made, and took time to discuss suggestions for zoning-related 34
variations that could be left in the hands of administrative staff. Trustees clarified details of some of these 35
suggestions cautioning that the provision of administrative relief could be abused and difficult to explain to 36
residents and reviewed the established zoning variation process. 37
38
Ms. Brobeck concluded her remarks by reviewing next steps that will be taken and the timing of the process 39
for providing public review of the draft changes and bringing the final approval of the zoning code update to 40
conclusion. Trustees clarified that the last full code update took place in 1969, reviewed specific aspects of 41
the approval timeline, clarified opportunities for resident input, and engaged in a discussion of the housing 42
7
stock in the Village. President Kaz thanked the representatives of Teska Associates for their update and 1
turned to Reports from Staff. 2
3
Report from Staff 4
C. Community Development 5
D. Finance 6
E. Police 7
Acting Chief Silva on police activity in the month of November highlighting calls for service, traffic 8
enforcement, vacation house watches, training activities, and resident outreach. Resident David Joyce asked 9
Chief Silva to characterize the response that would be made by the Kenilworth Police Department to activity 10
involving the U.S. Immigration and Customs Enforcement Agency. Chief Silva responded to his satisfaction. 11
F. Public Works 12
G. Legal Counsel 13
H. Village Manager 14
Manager Thake characterized work progress on the ongoing Lakefront Improvement Project as very good but 15
cautioned the Board that weather conditions can affect progress going forward. 16
17
Business from the Public 18
19
President Kaz asked whether there was any Business from the Public. There was none 20
21
Executive Session 22
23
Hearing no further public business, President Kaz asked for a motion to adjourn to executive session. Trustee 24
Ransford offered a motion to convene in Executive Session for the purpose of discussing 1) Collective 25
Bargaining; and, 2) The appointment, employment, compensation, discipline, performance or dismissal of a 26
specific employee. Trustee Hannus seconded the motion. 27
28
A roll call vote was taken as follows: 29
30
For: Ransford, Ottsen, Hannus, Lojkovic, Vitu 31
32
Opposed: None 33
34
The roll call tally was 5 votes in favor, and none opposed. President Kaz declared the motion passed at 6:29 35
p.m. and then asked unauthorized persons to clear the meeting. 36
37
Adjourn 38
39
Having no further business, President Kaz asked for a motion to adjourn the meeting. Trustee Ottsen so 40
moved, and Trustee Lojkovic seconded the motion. 41
42
A roll call vote was taken as follows: 43
44
8
For: Ransford, Ottsen, Hannus, Lojkovic, Vitu 1
2
Opposed: None 3
4
The roll call tally was five votes in favor, and none opposed. 5
6
President Kaz declared the meeting adjourned at 6:56 p.m. 7
8
9
Request for Board Action
Agenda Item: IV – Warrant List
Staff Contact: Katarzyna Thake, Administration
Kathleen Morley, Lauterbach & Amen
Subject: Approval of the Warrant List
Summary: Warrants are presented for consideration and approval in two different
classifications. Class A warrants are those payments which are submitted to the Village Board
for review and approval. For these warrants, no payment has been issued. Class B warrants
are payments that have already been made and are submitted to the Village Board for
ratification. Employee payroll is typically included in the Class B warrants total when
presented, but not shown on check listing since payroll is paid from the payroll account.
Payments which are of particular note are highlighted on the warrant list.
Policy: Village financial activity is governed by a combination of the Village Code and financial
policies of the Village.
Recommendation: The Village Manager submits the following for review and consideration:
• Class A Warrant List (attached) totaling $815,857.11 - 106 disbursements
• Class B Warrant List and Payroll totaling $189,549.22
o Class B Check Register = $17,500.00
o Employee Payroll, December 24 $77,817.60
o Employee Payroll, December 11 $94,231.62
o Payroll expenses do not appear on the Class B Warrant List printout but are
ratified with the Class B Warrants
• Check Numbering:
o Last check number approved – GEN 41962, 713(A) – December 9th
o Start/End Checks Class B - GEN 41963 - 41967
o Start/End Check Class A - GEN 41968 - 42040, 714(A) – 743(A) & 744(E)
– 746(E)
• Voided Checks and Cause
o None
Considered By: Date:
Village Board 01/20/26
Village of
10
CHECK REGISTER FOR VILLAGE OF KENILWORTH 1/6Page: 01/14/2026 03:08 PM
User: JSCHMIDT
DB: Kenilworth
CHECK DATE FROM 01/14/2026 - 01/23/2026
CLASS A WARRANTS FOR 1/20/2026
TO BE APPROVED
AmountDescriptionVendor NameCheckBankCheck Date
Bank GEN GENERAL OPERATING
Check Type: ACH Transaction
5,875.38 NOV 2025 LEGAL SERVICESANCEL, GLINK, DIAMOND, BUSH, DICANN714(A)GEN01/21/2026
200.87 NOV 2025 BUILDING PLAN REVIEW AND INSPECSAFE BUILT715(A)GEN01/21/2026
6,300.15 NOV 2025 BUILDING PLAN REVIEW AND INSPEC
6,501.02
1,993.99 FINAL STREET SWEEP OF THE YEAR.ADVANCE SWEEPING SERVICES, INC.716(A)GEN01/21/2026
2,560.00 WIN911 DATABASE REBUILDALLEN INTEGRATED CONTROL SOLUTIONS717(A)GEN01/21/2026
392.97 OFFICE SUPPLIES & SNOW PLOW POLY EDGEAMAZON CAPITAL SERVICES718(A)GEN01/21/2026
38.97 SAFETY SEAT SENSOR REPLACEMENT PARTS
42.73 OFFICE SUPPLIES
474.67
87.80 CODIFICATION UPDATES - DECEMBER 2025AMERICAN LEGAL PUBLISHING CORP719(A)GEN01/21/2026
15,300.00 BS&A CLOUD UPGRADE + ANNUAL SUPPORT FEEBS&A720(A)GEN01/21/2026
296,980.47 PHASE 2 BIP CONSTRUCTION - PAY APP 3BULLEY & ANDREWS, LLC721(A)GEN01/21/2026
51.81 2ND WEEK DECEMBER UNIFORM RENTALCINTAS CORPORATION722(A)GEN01/21/2026
51.81 1ST WEEK DECEMBER UNIFORM RENTAL
51.81 4TH WEEK OF DECEMBER UNIFORM RENTAL
51.81 3RD WEEK DECEMBER UNIFORM RENTAL
51.81 1ST WEEK JANUARY UNIFORM RENTAL
259.05
376.00 VH & PW PHONE 012126-022026CONVERGED DIGITAL NETWORKS LLC723(A)GEN01/21/2026
151.57 EMPLOYEE VISION BENEFITS - JANUARY 2026DELTA DENTAL OF ILLINOIS - VISION724(A)GEN01/21/2026
19.61 JANUARY EMPLOYEE VISION BENEFITS - HIGH DELTA DENTAL OF ILLINOIS VISION HD725(A)GEN01/21/2026
2,309.98 FUEL USAGE - OCTOBER AND NOVEMBER 2025FEECE OIL CO.726(A)GEN01/21/2026
2,642.62 METERS FOR REPLACEMENTFERGUSON ENTERPRISES, LLC727(A)GEN01/21/2026
65.00 10 YARD ROLL OFF FOR PUMPKINSFLOOD BROTHERS DISPOSAL728(A)GEN01/21/2026
3,309.20 FALL LEAF PICK UP 4 PICK UPS
553.65 ROLL OFF FOR LEAVES FINAL PICK UP
3,927.85
263.60 NOV. 2025 GENERAL ENG SERVICESGEWALT HAMILTON ASSOC., INC729(A)GEN01/21/2026
3,749.70 NOV. 2025 PLAN REVIEW ENG SERVICES
1,292.00 LEAK DETECT ALONG SHERIDAN RD.
200.00 JUNE 2025 ENGINEERING SERVICES - BIP REV
5,505.30
17.54 COMED RELOC - CONDUIT ADAPTER TRANSFORMEGRAINGER730(A)GEN01/21/2026
4,615.70 CONTRACT IT SVC - DECEMBERINTERDEV, LLC731(A)GEN01/21/2026
122,959.00 2026 ANNUAL CONTRIBUTIONINTERGOVERNMENTAL RISK MGT AGENCY732(A)GEN01/21/2026
10,525.00 PARKWAY PLANTING PROGRAM 2025LANGTON GROUP733(A)GEN01/21/2026
7,725.00 ACCOUNTING SERVICES - NOVEMBER 2025LAUTERBACH & AMEN, LLP734(A)GEN01/21/2026
228.36 LIFE INSURANCE - JANUARY 2026MADISON NATIONAL LIFE735(A)GEN01/21/2026
131.76 MORTAR AND TILES FOR VH BATHROOMMENARDS-MORTON GROVE736(A)GEN01/21/2026
330.32 BATHROOM UPGRADE MATERIAL
11
CHECK REGISTER FOR VILLAGE OF KENILWORTH 2/6Page: 01/14/2026 03:08 PM
User: JSCHMIDT
DB: Kenilworth
CHECK DATE FROM 01/14/2026 - 01/23/2026
CLASS A WARRANTS FOR 1/20/2026
TO BE APPROVED
AmountDescriptionVendor NameCheckBankCheck Date
39.92 SILICONE FOR CAULKING BATHROOM
104.20 SHOWER HEAD AND ITEMS FOR NEW BATHROOM V
168.65 CLEANING SUPPLIES FOR PW AND MOUSE TRAPS
143.98 TOWER HEATERS FOR CONFERENCE ROOM
64.98 CARBON MONOXIDE/SMOKE DETECTORS
983.81
33,417.41 MEDICAL INSURANCE NOVEMBER 2025NORTH SUBURBAN EMPLOYEE COOP737(A)GEN01/21/2026
33,417.41 MEDICAL INSURANCE - DECEMBER 2025
66,834.82
2,153.00 DENTAL INSURANCE NOVEMBER 2025NORTH SUBURBAN EMPLOYEE COOP738(A)GEN01/21/2026
2,153.00 DENTAL INSURANCE - DECEMBER 2025
4,306.00
425.00 DECEMBER TREE INSPECTIONSOSAGE739(A)GEN01/21/2026
67.79 12/2025 BUILDING PLAN REVIEW AND INSPECTSAFE BUILT740(A)GEN01/21/2026
89.28 12/2025 BUILDING PLAN REVIEW AND INSPECT
5,046.40 12/2025 BUILDING PLAN REVIEW AND INSPECT
5,203.47
8.47 TRAY LINER FOR PAINTINGSHERWIN-WILLIAMS741(A)GEN01/21/2026
123.65 PAINT FOR VH RESTROOM
132.12
4,486.59 JANURARY 2026 WASTE TIP FEESWANNC742(A)GEN01/21/2026
4,486.59 FEBRUARY 2026 WASTE TIP FEE
8,973.18
8,026.25 ARCH. BEACH PROJECT - VB APPROVAL 10/28/WOODHOUSE TINUCCI ARCHITECTS, LLC743(A)GEN01/21/2026
7,955.00 ARCH. BEACH PROJECT - VB APPROVAL 10/28/
15,981.25
593,875.56 Total ACH Transaction:
Check Type: EFT Transfer
11.68 FOXIT - 1 USER 1 MONTH SUBSCRIPTIONFIRST NATIONAL BANK OF OMAHA744(E)GEN01/14/2026
11.68 FOXIT - 1 USER 1 MONTH SUBSCRIPTION
380.00 GFOA FY26 BUDGET AWARD APPLICATION
163.55 ADMIN VOK APPAREL
701.25 PDQ SOFTWARE DEPLOYMENT TOOL
100.00 SOFTWARE - MAIL SEND TRANSFER SERVICE
75.00 CONSTANT CONTACT 102125-112125
75.00 CONSTANT CONTACT 112125-122125
10.48 CERTIFIED MAIL AND RETURN RECEIPT
61.00 UB POSTCARD STAMPS - ONE ROLL
5.34 CODE ENFORCEMENT - CERTIFIED MAIL
215.82 INTERNET SERVICE VILLAGE HALL 111525-121
12
CHECK REGISTER FOR VILLAGE OF KENILWORTH 3/6Page: 01/14/2026 03:08 PM
User: JSCHMIDT
DB: Kenilworth
CHECK DATE FROM 01/14/2026 - 01/23/2026
CLASS A WARRANTS FOR 1/20/2026
TO BE APPROVED
AmountDescriptionVendor NameCheckBankCheck Date
215.82 INTERNET SERVICE VILLAGE HALL 121525-011
2,026.62
98.94 ID MACHINE PRINTER INK CATRIDGEFIRST NATIONAL BANK OF OMAHA745(E)GEN01/14/2026
50.97 CHRISTMAS DINNER (2) FOR OFFICERS
149.91
20.19 O RING FOR CARB ON WATER PUMPFIRST NATIONAL BANK OF OMAHA746(E)GEN01/14/2026
75.00 90 GALLONS OF USED OIL PICKED UP FOR REC
495.00 BOOM TRUCK YEARLY INSPECTION
590.19
2,766.72 Total EFT Transfer:
Check Type: Paper Check
158.11 COMMUNITY POLICING- LOLLIPOPS FOR DESK AAMAZON CAPITAL SERVICES41968GEN01/21/2026
2,100.00 FLUSH HEAVY DEBRIS IN FLAT LINE ON IVY CAMERICAN UNDERGROUND, INC41969GEN01/21/2026
2,500.00 BD Bond RefundANTHONY MEHRABIAN41970GEN01/21/2026
261.72 PD CELLPHONES 6 (10262025-11252025)AT&T41971GEN01/21/2026
240.02 ADMIN & PW CELL PHONES - NOVEMBER2025
277.23 ADMIN/PW PHONE - DECEMBER 2025
261.72 PD CELLPHONES (NOV25-DEC25)
1,040.69
131.50 5 GAL CAR WASH SOAP AND WAXATCO INTERNATIONAL41972GEN01/21/2026
5,000.00 BD Bond RefundBETTINA FAULKNER41973GEN01/21/2026
113.63 CMAP YEARLY DUES - FY2026CHICAGO METROPOLITAN AGENCY41974GEN01/21/2026
100.91 LEGAL NOTICES 110125-113025CHICAGO TRIBUNE COMPANY, LLC41975GEN01/21/2026
1,893.75 12/2025 LEGAL SERVICES RENDERED - LABOR CLARK BAIRD SMITH LLP41976GEN01/21/2026
1,631.80 STREET LIGHTS 101325-111725COM ED-STREET LIGHTS41977GEN01/21/2026
60.00 PRV STATION ELECTRIC 102925-112625COMED41978GEN01/21/2026
365.64 BOSTER PUMP STATION ELECTRIC 102925-1126
35.67 WATER TOWER ELECTRIC 110325-120325
461.31
3,250.94 2025/2026 ROAD SALT COMPASS MINERALCOMPASS MINERALS AMERICA41979GEN01/21/2026
5,172.48 2025/2026 ROAD SALT COMPASS MINERAL
8,423.42
2,775.45 3 NEW DESKTOP COMPUTERSDELL MARKETING, LP41980GEN01/21/2026
700.00 PRE-EMPLOYMENT, PSYCH FOR VALLEJODENNIS P. SELVIG41981GEN01/21/2026
1,600.00 BD Bond RefundDENNIS REMKE41982GEN01/21/2026
2,500.00 BD Bond RefundDSM Properties Inc41983GEN01/21/2026
2,500.00 BD Bond RefundEdward George Jones and Sarah Jones41984GEN01/21/2026
81.34 AMBULANCE FEES NOVEMBER 2025EMS MANAGEMENT & CONSULTANTS41985GEN01/21/2026
284.26 AMBULANCE USER FEES - DECEMBER 2025EMS MANAGEMENT & CONSULTANTS, INC.41986GEN01/21/2026
11.25 SHINGLE TABS FOR HOLIDAY LIGHTS TRAIN STFIRST NATIONAL BANK OF OMAHA41987GEN01/21/2026
281.41 SUPPLIES FOR HOLIDAY PLANTERS
16.49 ICE MAKER FOR VILLAGE HALL LUNCHROOM
13
CHECK REGISTER FOR VILLAGE OF KENILWORTH 4/6Page: 01/14/2026 03:08 PM
User: JSCHMIDT
DB: Kenilworth
CHECK DATE FROM 01/14/2026 - 01/23/2026
CLASS A WARRANTS FOR 1/20/2026
TO BE APPROVED
AmountDescriptionVendor NameCheckBankCheck Date
1,425.58 EGR VALVE FAIL ON 5 YARD DUMP TRUCK
114.32 CEDAR TIP DECOR FOR PLANTERS
(25.58)CREDIT FOR TAX FROM RECIEPT
(10.40)CREDIT FOR TAXES ON INVOICE
1,813.07
7,500.00 6 FLOCK SAFETY FALCON CAMERAS- ANNUAL FEFLOCK SAFETY41988GEN01/21/2026
615.00 SEMI ANNUAL CLEAN AGEN INSPECTION VHFOX VALLEY FIRE & SAFETY41989GEN01/21/2026
183.00 QUARTERLY FIRE ALARM MONITORING VILLAGE
798.00
6.17 SLIDE TERMINAL ELECTRICAL GLENBROOK AUTO PARTS INC41990GEN01/21/2026
12,140.00 EMERGENCY REPAIR ROOFTOP UNIT HEAT EXCHAHAYES MECHANICAL41991GEN01/21/2026
902.23 10' PLOW CUTTING EDGES FOR FIVE YARD TRUHENDERSON PRODUCTS, INC.41992GEN01/21/2026
911.70 GREEN BAY ROAD SIGNAL MAINT. Q2 2025IL DEPARTMENT OF TRANSPORTATION41993GEN01/21/2026
911.70 GREEN BAY ROAD SIGNAL MAINT. Q3 2025
1,823.40
57.00 UNIFORMS- SILVA 1 WHITE S/SJ.G. UNIFORMS INC41994GEN01/21/2026
269.90 UNIFORMS-SILVA S S/S W/ PATCHES & EMBRIO
180.95 UNIFORMS-SILVA BLK LEATHER SHOES, 4 SOCK
384.50 UNIFORMS- VALLEJO VEST COVER, MOCK TNECK
48.00 UNIFORMS- SILVA 2 MOCK DICKIES NAVY
328.50 UNIFORMS-EDELSTEIN 3 BLAUER S/S
36.00 UNIFORMS-VALLEJO- 3 SHOULDER PATCHES SWI
433.50 UNIFORMS- LABEAU (SGT) PATCHES, SHIRT, E
1,738.35
2,500.00 BD Bond RefundJACK HUBER41995GEN01/21/2026
2,500.00 BD Bond RefundJianhua Zhu & Qiushi Zheng41996GEN01/21/2026
2,500.00 BD Bond RefundJIM LAWSON41997GEN01/21/2026
2,500.00 BD Bond RefundJOAO ARAUJO41998GEN01/21/2026
2,500.00 BD Bond RefundK A HARRIS41999GEN01/21/2026
580.00 BD Bond RefundKim Carney42000GEN01/21/2026
245.00 DAILY PARKING PERMITSKRAM DIGITAL SOLUTIONS, INC42001GEN01/21/2026
225.00 UTILITY BILLING POSTCARDS
470.00
5,000.00 BD Bond RefundKrugel Cobbles42002GEN01/21/2026
2,500.00 BD Bond RefundLEANNE YLITALO42003GEN01/21/2026
55.20 3RD WEEK DECEMBER MAT RENTAL TRAIN STATILECHNER AND SONS42004GEN01/21/2026
55.20 1ST WEEK OF DECEMBER MAT RENTAL TRAIN ST
55.20 4TH WEEK DECEMBER MAT RENTAL TRAIN STATI
55.20 5TH WEEK DECEMBER MAT RENTAL TRAIN STATI
55.20 1ST WEEK JANUARY MAT RENTAL TRAIN STATIO
55.20 2ND WEEK JAN MAT RENTAL TRAIN STATION
331.20
1,862.50 BD Bond RefundMary Arthur42005GEN01/21/2026
2,704.86 VENTRAC MODULE REPLACEMENTMCCULLOUGH EQUIPMENT 42006GEN01/21/2026
2,500.00 BD Bond RefundMcDermott Construction, Inc.42007GEN01/21/2026
307.20 BLACKDIRT FOR WINTER DAMAGE TO PARKWAYSMENONI & MOCOGNI42008GEN01/21/2026
14
CHECK REGISTER FOR VILLAGE OF KENILWORTH 5/6Page: 01/14/2026 03:08 PM
User: JSCHMIDT
DB: Kenilworth
CHECK DATE FROM 01/14/2026 - 01/23/2026
CLASS A WARRANTS FOR 1/20/2026
TO BE APPROVED
AmountDescriptionVendor NameCheckBankCheck Date
44.98 STEEL TREE STAND FOR PLANTERSMILLEN ACE HARDWARE42009GEN01/21/2026
31.47 CLAMP REPAIR FOR THE BOILER AT WATER PLA
31.49 CHISEL FOR DRILL TO REMOVE GLUE FROM FLO
40.49 THERMOSTAT FOR WATER PLANT
148.43
60.77 WATER TOWER GAS 112125-122225NICOR42010GEN01/21/2026
321.36 WATER PLANT GAS 112125-122225
169.19 BOSTER PUMP GAS 112125-122225
1,172.67 NICOR PUBLIC WORKS 11/21/25-12/22/25
1,723.99
188.00 FINANCIAL FORECAST FORUM - KT & HMNORTHERN ILLINOIS UNIVERSITY42011GEN01/21/2026
573.74 PM AND REPAIR ROOFTOP HVAC UNITSNORTHERN WEATHERMAKERS HVAC42012GEN01/21/2026
423.38 REPAIR TRIPPED ROLL OUT SWITCH AFTER FUR
1,125.10 TROUBLE SHOOT, REPAIR AND PM BOILER
2,122.22
175.00 1/2 LEAD AND COPPER SAMPLES FOR 1ST ROUNPACE ANALYTICAL SERVICES, LLC42013GEN01/21/2026
60.00 BACTERIA MONTHLY WATER SAMPLE DECEMBER
455.00 13 LEAD AND COPPER SAMPLES 2ND ROUND
690.00
122.14 PLOW BOLTS AND NUTS FOR CUT EDGEPATLIN, INC.42014GEN01/21/2026
2,500.00 BD Bond RefundPerma-Seal42015GEN01/21/2026
1,217.30 HIGH PERFORMANCE COLD PATCH MATERIALPETER BAKER & SON CO42016GEN01/21/2026
720.60 TIRE REPAIR ON BACKHOEPOMP'S TIRE SERVICE, INC.42017GEN01/21/2026
398.84 POSTAGE PURCHASE & POSTAGE MACHINE RENTAQUADIENT FINANCE USA, INC.42018GEN01/21/2026
5,000.00 BD Bond RefundRAVINIA PLUMBING SEWER HEATING ELEC42019GEN01/21/2026
2,500.00 BD Bond RefundREKOSKE, JAMES42020GEN01/21/2026
2,240.75 BD Bond RefundRenewal by Andersen42021GEN01/21/2026
1,334.90 BD Bond RefundSCHERMERHORN & CO42022GEN01/21/2026
2,500.00 BD Bond RefundSHAKE GUYS, LLC42023GEN01/21/2026
2,500.00 BD Bond RefundSmart Roofing, Inc.42024GEN01/21/2026
12,408.54 OCT 25 - ZONING CODE UPDATETESKA ASSOCIATES42025GEN01/21/2026
7,718.98 NOV 2025 ZONING CODE UPDATE
6,194.55 NOV 2025 ZONING PLAN REVIEW SERVICES
26,322.07
3,185.00 BEACH IMPROVEMENT PROJECT MATERIAL TESTITESTING SERVICE CORPORATION42026GEN01/21/2026
10,545.00 BEACH IMPROVEMENT PROJECT MATERIAL TESTI
13,730.00
100.00 ELEVATOR INSPECTION @ 230 OXFORDTHOMPSON ELEVATOR INSPECTION42027GEN01/21/2026
243.17 INVESTIGATIVE TOOL SUBSCRIPTION (11/1/20THOMSON REUTERS-WEST42028GEN01/21/2026
243.17 INVESTIGATIVE TOOL SUBSCRIPTION (12/1/20
486.34
5,000.00 BD Bond RefundTim & Liza Reynolds42029GEN01/21/2026
15
CHECK REGISTER FOR VILLAGE OF KENILWORTH 6/6Page: 01/14/2026 03:08 PM
User: JSCHMIDT
DB: Kenilworth
CHECK DATE FROM 01/14/2026 - 01/23/2026
CLASS A WARRANTS FOR 1/20/2026
TO BE APPROVED
AmountDescriptionVendor NameCheckBankCheck Date
5,250.00 SKOKIE DITCH TREE REMOVALTRADITIONAL TREE CARE42030GEN01/21/2026
1,250.00 LARGE SILVER MAPLE EMERGENCY REMOVAL
6,500.00
1,330.00 BD Bond RefundTROLLEY, MEGAN42031GEN01/21/2026
273.37 HAVIS BROTHER POCKETJET PRINTER MOUNT ANULTRA STROBE COMMUNICATIONS INC42032GEN01/21/2026
2,500.00 BD Bond RefundUS Waterproofing42033GEN01/21/2026
2,500.00 BD Bond RefundUS Waterproofing42034GEN01/21/2026
214.16 CELL SERVICE FOR METER READ & SQUAD HOT VERIZON WIRELESS42035GEN01/21/2026
214.16 CELL SERVICE FOR METER READ & SQUAD HOT
428.32
15,677.17 PURCHASE OF WATER NOVEMBER 2025VILLAGE OF WILMETTE42036GEN01/21/2026
14,370.12 PURCHASE OF WATER - DECEMBER 2025
8,001.35 PURCHASE OF WATER - RATE ADJUSTMENT RETR
38,048.64
1,284.00 BD Bond RefundWilfredo Saucedo Vargas42037GEN01/21/2026
2,500.00 BD Bond RefundWILLIAM GRAHAM42038GEN01/21/2026
402.77 KENILWORTH POLICE CASE JACKETSYORKE PRINTING SHOPPE42039GEN01/21/2026
2,429.00 JAN 2026 PERMIT AND CODE ENFORCEMENT SERZAFIRO PAPASTRATAKOS // ZTP STUDIO42040GEN01/21/2026
219,214.83 Total Paper Check:
GEN TOTALS:
815,857.11 Total of 106 Disbursements:
0.00 Less 0 Void Checks:
815,857.11 Total of 106 Checks:
16
CHECK REGISTER FOR VILLAGE OF KENILWORTH 1/1Page: 01/12/2026 10:24 AM
User: JSCHMIDT
DB: Kenilworth
CHECK DATE FROM 12/12/2025 - 01/12/2026
CLASS B WARRANTS FOR 1/20/2026
TO BE RATIFIED
AmountDescriptionVendor NameCheckBankCheck Date
Bank GEN GENERAL OPERATING
Check Type: Paper Check
2,500.00 BD Bond RefundCittrix Building Services, Inc.41963GEN12/12/2025
5,000.00 BD Bond RefundDSM Properties Inc41964GEN12/12/2025
2,500.00 BD Bond RefundField Development Group41965GEN12/12/2025
5,000.00 BD Bond RefundMidwest Arbor Corporation41966GEN12/12/2025
2,500.00 BD Bond RefundMoises Numa41967GEN12/12/2025
17,500.00 Total Paper Check:
GEN TOTALS:
17,500.00 Total of 5 Disbursements:
0.00 Less 0 Void Checks:
17,500.00 Total of 5 Checks:
17
Request for Board Action
Agenda Item: V.A.1.
Staff Contact: Donald Leicht, Public Works
Subject: Resolution Authorizing the Use of the Municipal Partnering Initiative (MPI)
Contractual Pricing Pursuant to Government Joint Purchasing Act, 30 ILCS 525/0.01, et. seq.,
with Advanced Tree Care for the 2026 Tree Trimming Program in the Amount of $25,000
Summary: The Village undertakes an annual winter tree trimming program that consists of
pruning one-fifth of Village parkway trees on a five-year cycle. The work is done in the winter as
it allows for safe pruning of oaks and elm trees. This is also the best time of year for trees to be
inspected for damaged limbs that are at risk of falling. It is recommended that the Village Board
authorize the use of MPI pricing to enter into an agreement with Advanced Tree Care for
trimming services.
Background of Matter: Annually, the Village undertakes a winter tree trimming program for
parkway trees to be pruned by a licensed professional. The scope of work includes the removal of
hazardous dead limbs and cross-member branches, as well as raising the tree canopy to ensure
safe travel for both pedestrians and vehicles. During the program, one-fifth of the Village’s
parkway trees will be pruned, which allows for each parkway tree to be pruned once every five
years.
In 2026, the Municipal Partnering Initiative (MPI) obtained bid pricing for tree removal and tree
trimming. The bid is for a three-year agreement; Advanced Tree Care was the lowest responsible
bidder for the requested services. Neighboring communities have found the MPI pricing
acceptable and subsequently adopted the agreement.
The Village has previously contracted with Advanced Tree Care for the program and was
satisfied with their work. The tree trimming bid process was conducted by the Village of
Glenview on behalf of several communities, including Kenilworth. The process is substantially
similar to the formal bidding process conducted by the Village and is an acceptable alternative
as identified in the Purchasing Manual. Based on positive past experiences with Advanced Tree
Care, staff recommend awarding them the 2026 Tree Trimming contract for a period of one year
in the amount not to exceed $25,000. While the agreement with Glenview is for three years, the
Village will review and award the contract on an annual basis.
Policy: A formal bid process and Village Board approval are required for all contracts in excess
of $20,000. The bid process performed by Village of Glenview meets the requirements set forth
in the Village’s Purchasing Manual and through the Use of the Municipal Partnering Initiative
(MPI) Contractual Pricing Pursuant to Government Joint Purchasing Act, 30 ILCS 525/0.01, et.
seq.,
Financial Impact: The Village has adequate funding in the FY26 includes for winter tree
trimming.
Considered By: Date:
Village Board 01/20/26
Village of
18
Total Contract Amount Not to Exceed $25,000
Budget Amount (FY26) $25,000
Variance: $0 – On Budget
GL Number: General Fund: 01-600-5766
Recommendation: Staff recommends that the Village Board award the 2026 Tree Trimming
contract to Advanced Tree Care in the amount not to exceed $25,000.
Attachments:
• Resolution Awarding the Contract
• Proposed 1 year Contract and Bid Tab
19
VILLAGE OF KENILWORTH
RESOLUTION NO. 2026-__
A RESOLUTION AUTHORIZING THE USE OF THE MUNICIPAL PARTNERING INITIATIVE (MPI)
CONTRACTUAL PRICING PURSUANT TO GOVERNMENT JOINT PURCHASING ACT, 30 ILCS
525/0.01, ET. SEQ., WITH ADVANCED TREE CARE FOR THE 2026 TREE TRIMMING PROGRAM
IN THE AMOUNT OF $25,000
WHEREAS, the Village of Kenilworth ("Village") is a non -home rule municipality located
in Cook County, Illinois; and
WHEREAS, the Village is responsible for maintaining parkway tree health care; and
WHEREAS, the Village is interested in seeking tree trimming services; and
WHEREAS, the Village purchasing manual requires a formal bidding process and
Village Board approval for projects over $20,000; and
WHEREAS, the Village of Glenview solicited sealed bids for tree trimming in 202 5
through the Municipal Partnering Initiative on behalf of several villages, including the Village of
Kenilworth; and
WHEREAS, the sealed bid process conducted by the Village of Glenview substantially
meets the requirements of the Village of Kenilworth Purchasing Manual; and
WHEREAS, Advanced Tree Care past performance in the Village had me t or exceeded
expectations; and
WHEREAS, Village Staff have reviewed the bid and recommend that Advanced Tree
Care Services is determined to be the low and responsible bidder; and
WHEREAS, the Village fiscal ye ar 202 6 budget includes the funding necessary to
compensate the vendor for the selected work; and
WHEREAS, The Village of Kenilworth (“Village”) and Advanced Tree Care
(“Contractor”) desire to enter into a contract for the 2026 Tree Trimming Program; and
NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees of the
Village of Kenilworth, Cook County, Illinois, as follows:
Section 1. Recitals. The foregoing recitals are incorporated in and made a part of
this Resolution by this reference.
Section 2. Acceptance of Sealed Bids. The sealed bid process conducted by the
Village of Glenview was in substantial compliance with the Village Purchasing Manual.
Section 3. Award of Contract. The contract for the 202 6 Tree Trimming program is
hereby awarded to Advanced Tree Care in a form substantially simil ar to the contract for which
will be made available upon request.
20
Section 4. Execution of Contract . The Village Manager is hereby authorized and
directed to execute, on behalf of the Villag e, a contract with Advanced Tree Care for the 2026
Tree Trimming program. If an executed copy of the agreement is not signed by both parties
within 60 days after the effective date of this Resolution, then the Village has the right but not
the obligation to cancel the contract.
Passed this 20th day of January 2026.
AYES:
NAYS:
ABSENT:
ABSTAIN:
Approved this 20th day of January 2026.
Cecily Kaz
Village President
Attest:
Michael Gagnon
Village Clerk
21
-1-
VILLAGE OF KENILWORTH
CONTRACT/PROPOSAL FOR
2026 Tree Trimming
Full Name of Bidder Advanced Tree Care Inc.
Principal Office Address 600 Industrial Dr. Lincolnshire, IL 60069
Contact Person Mike Bramucci, President 847-587-8500
TO: Village of Kenilworth (“Owner”)
419 Richmond Road
Kenilworth, Illinois 60043
Attention: Katarzyna Thake
Village Manager
Bidder warrants and represents that Bidder has carefully
examined the Work Site described below and its environs
and has reviewed and understood all documents included,
referred to, or mentioned in this bound set of documents,
including Addenda Nos . None which are securely stapled
to the end of this Contract/Proposal.
1. Work Proposal
A. Contract and Work . If this Contract/Proposal is
accepted, Bidder proposes, and agrees, that Bidder shall,
at its sole cost and expense, provide, perform, and
complete, in the manner specified and described, and upon
the terms and conditions set forth, in this Contract/Proposal
and Owner's written notification of acceptance in the form
included in this bound set of documents, all of the following,
all of which is herein referred to as the “Work”:
1. Labor, Equipment, Materials and Supplies.
Provide, perform, and complete, in the manner specified
and described in this Contract/Proposal, all necessary work,
labor, services, transportation, equipment, materials,
supplies, information, data, and other means and items
necessary for the project consisting of trimming parkway
trees at various locations within the Village.
2. Permits. Procure and furnish all permits,
licenses, and other governmental approvals
and authorizations necessary in connection
therewith;
3. Bonds and Insurance . Procure and furnish all
bonds and all insurance certificates specified in
this Contract/Proposal;
4. Taxes. Pay all applicable federal, state, and
local taxes;
5. Miscellaneous. Do all other things required of
Bidder by this Contract/Proposal; and
6. Quality. Provide, perform, and complete all of
the foregoing in a proper and workmanlike
manner, consistent with highest standards of
professional and construction practices, in full
compliance with, and as required by or
pursuant, to this Contract/Proposal, and with
the greatest economy, efficiency, and
expedition consistent therewith, with only new,
undamaged, and first quality equipment,
materials, and supplies.
B. Performance Standards. If this Contract/Proposal
is accepted, Bidder proposes, and agrees, that all Work
shall be fully provided, performed, and completed in
accordance with the Attachment A
C. Responsibility for Damage or Loss . If this
Contract/Proposal is accepted, Bidder proposes, and
agrees, that Bidder shall be responsible and liable for, and
shall promptly and without charge to Owner repair or
replace, damage done to, and any loss or injury suffered
by, Owner, the Work, the Work Site, or other property or
persons as a result of the Work.
22
-2-
D. Inspection/Testing/Rejection. Owner shall have
the right to inspect all or any part of the Work and to reject
all or any part of the Work that is, in Owner's judgment,
defective or damaged or that in any way fails to conform
strictly to the requirements of this Contract/Proposal and
Owner, without limiting its other rights or remedies, may
require correction or replacement at Bidder's cost, perform
or have performed all Work necessary to complete or
correct all or any part of the Work that is defective,
damaged, or nonconforming and charge Bidder with any
excess cost incurred thereby, or cancel all or any part of
any order or this Contract/Proposal. Work so rejected may
be returned or held at Bidder's expense and risk.
2. Contract Price Proposal
If this Contract/Proposal is accepted, Bidder proposes,
and agrees, that Bidder shall take in full payment for all
Work and other matters set forth under Section 1 above,
including overhead and profit; taxes, contributions, and
premiums; and compensation to all subcontractors and
suppliers, the compensation set forth below.
A. SCHEDULE OF PRICES
For providing, performing, and completing all Work,
the SEE ATTACHMENT “B” BID TABULATION
TOTAL CONTRACT PRICE (in writing): TWENTY
FIVE THOUSAND Dollars and ZERO Cents
TOTAL CONTRACT PRICE (in figures): $25,000
Dollars and 00 Cents
B. BASIS FOR DETERMINING PRICES
It is expressly understood and agreed that:
1. All prices stated in the Schedule of Prices are
firm and shall not be subject to escalation or
change;
2. Owner is not subject to state or local sales,
use, and excise taxes, that no such taxes are
included in the Schedule of Prices, and that all
claim or right to claim any additional
compensation by reason of the payment of any
such tax is hereby waived and released;
3. All other applicable federal, state, and local
taxes of every kind and nature applicable to
the Work are included in the Schedule of Price
SEE ATTACHMENT “B” BID TABULATION
4. The approximate quantities set forth in the
Schedule of Prices for each Unit Price Item are
Owner's estimate only, that Owner reserves
the right to increase or decrease such
quantities, that payment for each Unit Price
Item shall be made only on the actual number
of acceptable units of such Unit Price Item
installed complete in place in full compliance
with this Contract/Proposal, and that all claim
or right to dispute or complain of any such
estimated quantity, or to assert that there was
any misunderstanding in regard to the nature
or amount of any Unit Price Item to be
provided or performed, is hereby waived and
released.
C. TIME OF PAYMENT
It is expressly understood and agreed that all
payments shall be made in accordance with the
following schedule: Within 45 days of receipt of
invoice. All payments may be subject to deduction
or setoff by reason of any failure of Bidder to
perform under this Contract/Proposal. Each
payment shall include Bidder's certification of the
value of, and partial or final waivers of lien
covering, all Work for which payment is then
requested and Bidder's certification that all prior
payments have been properly applied to the
payment or reimbursement of the costs with
respect to which they were paid.
3. Contract Time Proposal
If this Contract/Proposal is accepted, Bidder proposes,
and agrees, that Bidder shall commence the Work within 10
days following Owner's acceptance of this
Contract/Proposal provided Bidder shall have furnished to
Owner all bonds and all insurance certificates specified in
this Contract/Proposal (the “Commencement Date”). If this
Contract/Proposal is accepted, Bidder proposes, and
agrees, that Bidder shall perform the Work diligently and
continuously.
4. Financial Assurance
A. Insurance. If this Contract/Proposal is accepted,
Bidder proposes, and agrees, that Bidder shall provide
certificates of insurance evidencing the minimum insurance
coverages and limits set forth below within 10 days
following Owner's acceptance of this Contract/Proposal.
Such policies shall be in form, and from companies,
acceptable to Owner. The insurance coverages and limits
set forth below shall be deemed to be minimum coverages
and limits and shall not be construed in any way as a
limitation on Bidder's duty to carry adequate insurance or
on Bidder's liability for losses or damages under this
Contract/Proposal. The minimum insurance coverages and
limits that shall be maintained at all times while providing,
performing, or completing the Work are as follows:
1. Workers' Compensation and Employer's
Liability
Limits shall not be less than:
Worker's Compensation: Statutory
Employer's Liability: $500,000 ea. accident -
injury
$500,000 ea. employee -
disease
$500,000 disease-policy
23
-3-
Such insurance shall evidence that coverage
applies to the State of Illinois.
2. Comprehensive Motor Vehicle Liability
Limits for vehicles owned, non -owned or
rented shall not be less than:
$1,000,000 Bodily Injury and Property Damage
Combined Single Limit
3. Comprehensive General Liability
Limits shall not be less than:
$1,000,000 Bodily Injury and Property Damage
Combined Single Limit.
Coverage is to be written on an “occurrence”
basis.
Coverage to include:
- Premises Operations
- Products/Completed Operations
- Independent Contractors
- Personal Injury (with Employment
Exclusion deleted)
- Broad Form Property Damage
Endorsement
- “X,” “C,” and “U”
- Contractual Liability
Contractual Liability coverage shall specifically
include the indemnification set forth below.
4. Umbrella Liability
Limits shall not be less than:
$2,000,000 Bodily Injury and Property Damage
Combined Single Limit.
This Policy shall apply in excess of the limits
stated in 1, 2, and 3 above.
C. Indemnification. If this Contract/Proposal is
accepted, Bidder proposes, and agrees, that Bidder shall
indemnify, save harmless, and defend Owner against all
damages, liability, claims, losses, and expenses (including
attorneys' fee) that may arise, or be alleged to have arisen,
out of or in connection with Bidder's performance of, or
failure to perform, the Work or any part thereof, or any
failure to meet the representations and warranties set forth
in Section 6 of this Contract/Proposal.
D. Penalties. If this Contract/Proposal is accepted,
Bidder proposes, and agrees, that Bidder shall be solely
liable for any fines or civil penalties that are imposed by any
governmental or quasi -governmental agency or body that
may arise, or be alleged to have arisen, out of or in
connection with Bidder's performance of, or failure to
perform, the Work or any part thereof.
5. Firm Proposal
All prices and other terms stated in this
Contract/Proposal are firm and shall not be subject to
withdrawal, escalation, or change provided Owner accepts
this Contract/Proposal within 45 days after the date this
sealed Contract/Proposal is opened.
6. Bidder's Representations and Warranties
In order to induce Owner to accept this
Contract/Proposal, Bidder hereby represents and warrants
as follows:
A. The Work. The Work, and all of its components,
shall be of merchantable quality; shall be free from any
latent or patent defects and flaws in workmanship,
materials, and design; shall strictly conform to the
requirements of this Contract/Proposal, including, without
limitation, the performance standards set forth in
Subsection 1B of this Contract/Proposal; and shall be fit,
sufficient, and suitable for the purposes expressed in, or
reasonably inferred from, this Contract/Proposal and the
warranties expressed herein shall be in addition to any
other warranties expressed or implied by law, which are
hereby reserved unto Owner.
B. Compliance with Laws . The Work, and all of its
components, shall be provided, performed, and completed
in compliance with, and Bidder agrees to be bound by, all
applicable federal, state, and local laws, orders, rules, and
regulations, as they may be modified or amended from time
to time, including without limitation the Prevailing Wage Act,
820 ILCS 130/0.01 et seq. (in furtherance of which, a copy
of Owner's ordinance ascertaining the prevailing rate of
wages, in effect as of the date of this Contract/Proposal,
has been attached as an Appendix to this
Contract/Proposal; if the Illinois Department of Labor
revises the prevailing rate of hourly wages to be paid, the
revised rate shall apply to this Contract/Proposal prevailing
wage laws; any statutes requiring preference to laborers of
specified classes; the Illinois Steel Products Procurement
Act, 30 ILCS 565/1 et seq.; any statutes prohibiting
discrimination because of, or requiring affirmative action
based on, race, creed, color, national origin, age, sex, or
other prohibited classification; and any statutes regarding
safety or the performance of the Work.
C. Not Barred . Bidder is not barred by law from
contracting with Owner or with any other unit of state or
local government as a result of (i) a delinquency in the
payment of any tax administered by the Illinois Department
of Revenue unless Bidder is contesting, in accordance with
the procedures established by the appropriate Revenue
Act, its liability for the tax or the amount of tax, as set forth
in 65 ILCS 5/11 -42.1-1; or (ii) a violation of either Section
33E-3 or Section 33E-4 of Article 33 of the Criminal Code of
1961, 720 ILCS 5/33E -1 et seq. Bidder is not acting,
directly or indirectly, for or on behalf of any person, group,
entity or nation named by the United States Treasury
Department as a Specially Designated National and
Blocked Person, or for or on behalf of any person, group,
entity or nation designated in Presidential Executive Order
24
-4-
13224 as a person who commits, threatens to commit, or
supports terrorism; and Bidder is not engaged in this
transaction directly or indirectly on behalf of, or facilitating
this transaction directly or indirectly on behalf of, any such
person, group, entity or nation.
D. Patriot Act Compliance. The Contractor represents
and warrants to the Owner that neither it nor any of its
principals, shareholders, members, partners, or affiliates, as
applicable, is a person or entity named as a Specially
Designated National and Blocked Person (as defined in
Presidential Executive Order 13224) and that it is not
acting, directly or indirectly, for or on behalf of a Specially
Designated National and Blocked Person. The Contractor
further represents and warrants to the Owner that the
Contractor and its principals, shareholders, members,
partners, or affiliates, as applicable, are not, directly or
indirectly, engaged in, and are not facilitating, the
transactions contemplated by this Agreement on behalf of
any person or entity named as a Specially Designated
National and Blocked Person. The Contractor hereby
agrees to defend, indemnify and hold harmless the Owner,
its Board of Trustees, and all Owner appointed officials,
officers, employees, agents, representatives, engineers,
and attorneys, from and against any and all claims,
damages, losses, risks, liabilities, and expenses (including
reasonable attorneys' fees and costs) arising from or
related to any breach of the foregoing representations and
warranties.
E. Qualified. Bidder has the requisite experience,
ability, capital, facilities, plant, organization, and staff to
enable Bidder to perform the Work successfully and
promptly and to commence and complete the Work within
the Contract Price and Contract Time Proposals set forth
above.
7. Acknowledgements
In submitting this Contract/Proposal, Bidder
acknowledges and agrees that:
A. Reliance. Owner is relying on all warranties,
representations, and statements made by Bidder in this
Contract/Proposal.
B. Reservation of Rights. Owner reserves the right to
reject any and all proposals, reserves the right to reject the
low price proposal, and reserves such other rights as are
set forth in the Instructions to Bidders.
C. Acceptance. If this Contract/Proposal is accepted,
Bidder shall be bound by each and every term, condition, or
provision contained in this Contract/Proposal and in
Owner's written notification of acceptance in the form
included in this bound set of documents.
D. Remedies. Each of the rights and remedies
reserved to Owner in this Contract/Proposal shall be
cumulative and additional to any other or further remedies
provided in law or equity or in this Contract/Proposal.
E. Time. Time is of the essence of this
Contract/Proposal and, except where stated otherwise,
references in this Contract/Proposal to days shall be
construed to refer to calendar days.
F. No Waiver . No examination, inspection,
investigation, test, measurement, review, determination,
decision, certificate, or approval by Owner, whether before
or after Owner's acceptance of this Contract/Proposal; nor
any information or data supplied by Owner, whether before
or after Owner's acceptance of this Contract/Proposal; nor
any order by Owner for the payment of money; nor any
payment for, or use, possession, or acceptance of, the
whole or any part of the Work by Owner; nor any extension
of time granted by Owner; nor any delay by Owner in
exercising any right under this Contract/Proposal; nor any
other act or omission of Owner shall constitute or be
deemed to be an acceptance of any defective, damaged, or
nonconforming Work, nor operate to waive or otherwise
diminish the effect of any representation or warranty made
by Bidder; or of any requirement or provision of this
Contract/Proposal; or of any remedy, power, or right of
Owner.
G. Severability. The provisions of this Contract/
Proposal shall be interpreted when possible to sustain their
legality and enforceability as a whole. In the event any
provision of this Contract/Proposal shall be held invalid,
illegal, or unenforceable by a court of competent
jurisdiction, in whole or in part, neither the validity of the
remaining part of such provision, nor the validity of any
other provisions of this Contract/Proposal shall be in any
way affected thereby.
H. Amendments. No modification, addition, deletion,
revision, alteration, or other change to this
Contract/Proposal shall be effective unless and until such
change is reduced to writing and executed and delivered by
Owner and Bidder.
I. Assignment. Neither this Contract/Proposal, nor
any interest herein, shall be assigned or subcontracted, in
whole or in part, by Bidder except upon the prior written
consent of Owner.
J. Governing Law . This Contract/Proposal, and the
rights of the parties under this Contract/Proposal shall be
interpreted according to the internal laws, but not the
conflict of law rules, of the State of Illinois.
DATED this _________ day of ______________, 20 .
25
-5-
Bidder's Status: (X) _Illinois__ Corporation ( ) _______________ Partnership ( )Individual Proprietor
(State) (State)
Bidder's Name: ___ ADVANCED TREE CARE, INC _
Doing Business As (if different): _______________________________________________________________________
Signature of Bidder or Authorized Agent: ____________________________________ ____________________________
(corporate seal) Printed Name: ______________________________________________
(if corporation)
Title/Position: ______________________________________________
Bidder's Business Address: ______600 Industrial Dr. Lincolnshire, IL 60069________
_______________________________________________________________________
Bidder's Business Telephone: ____ 847-587-8500 Facsimile: ___847-973-9484__________________________
If a Corporation or Partnership, list all Officers or Partners:
NAME
TITLE
ADDRESS
26
-6-
ACCEPTANCE
The Contract/Proposal attached hereto and by this reference incorporated herein and made a part hereof is hereby
accepted by the order of the Village of Kenilworth (“Owner”) this ____ day of ____________ 2026.
This Acceptance, together with the Contract/Proposal attached hereto, constitutes the entire and only agreement between
the parties relating to the accomplishment of the Work and the compensation therefor and supersedes and merges any
other prior or contemporaneous discussions, agreements, or understandings, whether written or oral, and shall prevail
over any contradictory or inconsistent terms or conditions contained in any purchase order, acceptance,
acknowledgement, invoice, or other standard form used by the parties in the performance of the Contract/Proposal. Any
such contradictory or inconsistent terms or conditions shall be deemed objected to by Owner without further notice of
objection and shall be of no effect nor in any circumstances binding upon Owner unless accepted by Owner in a written
document plainly labeled “Amendment to Contract/Proposal.” Acceptance or rejection by Owner of any such contradictory
or inconsistent terms or conditions shall not constitute acceptance of any other contradictory or inconsistent terms or
conditions.
VILLAGE OF KENILWORTH
By: ______________________________________
Katarzyna Thake
Village Manager
27
PAYMENT BOND
-1-
28
29
30
31
32
33
Request for Board Action
Agenda Item: V.A.2
Staff Contact: Donny Leicht, Public Works Superintendent
Jordan Schmidt, Management Analyst
Subject: Resolution Authorizing Execution of an Easement Agreement with Commonwealth
Edison for a Relocated Vault Near 604 Green Bay Road
Summary: As part of preparing the drop chamber for a shovel ready project at 604 Green Bay
Road, an electrical vault maintained by Commonwealth Edison (ComEd) requires relocation.
The work includes relocating an underground cable around an existing manhole, and vault
removal. ComEd is ready to proceed with the work but requires an easement agreement to
formalize access to our property. The Village Attorney has reviewed the agreement and finds it
acceptable. It is recommended the Village Board review and approve the Easement Agreement.
Background of Matter: In March 2024, the Village entered into a Purchase and Sale Agreement
for 604 Green Bay Road. At that time, it was determined that the Metropolitan Water Reclamation
District (MWRD) owned a drop chamber and other appurtenances that were located diagonally
across the property. In order to build upon the property, it was determined to be in the best interest
to have the existing drop chamber and structures abandoned, removed and relocated in the right-
of-way and/or easement located along Green Bay Road and Roger Avenue.
The Village contracted with Ciorba Group to complete the design work for the drop chamber
relocation. During the design work, it was discovered that ComEd had an electrical vault in the
area that conflicted with the drop chamber work. To get the project shovel ready, ComEd would
need to relocate an underground cable, and
remove the existing vault.
ComEd is ready to proceed with the relocation
work but requires an easement agreement to
formalize access to our property. The Village
Attorney has reviewed the agreement and
finds it acceptable. To allow ComEd to
proceed with the work, it is recommended the
Board approve the Easement Agreement.
Financial Impact: No direct financial impact is anticipated as a result of granting the
easement.
Recommendation: It is recommended that the Village Board approve the Easement
Agreement with Commonwealth Edison.
Attachments:
• Resolution; and Grant of Easement
Considered By: Date:
Village Board 01/20/26
Village of
34
VILLAGE OF KENILWORTH
RESOLUTION NO. 2026-XX
A RESOLUTION AUTHORIZING THE EXECUTION OF A GRANT OF EASEMENT BETWEEN
THE VILLAGE OF KENILWORTH AND COMMONWEALTH EDISON
WHEREAS, the Village of Kenilworth (“Village”) is the record owner of the property
commonly known as 400 Green Bay Raod, Kenilworth, Illinois, Permanent Index Number 05-28-
225-002 (“Subject Property”), which is located within the corporate limits of the Village; and
WHEREAS, Commonwealth Edison (“ComEd”) maintains and operate s underground
electrical utilities within the Village limits; and
WHEREAS, the Village seeks to have ComEd relocate their existing utilities at 604 Green
Bay Road, Kenilworth, Illinois for the purpose of completing an infrastructure project; and
WHEREAS, ComEd has requested that the Village grant to ComEd an easement over a
portion of the Subject Property for the purpose of constructing, operating, repairing, maintaining,
modifying, reconstructing, replacing, supplementing, relocating, and removing, from time to time,
poles, guys, anchors, wires, cables, fiber, condutis, manholes, transformers, pedestals, splice
boxes, or other facilities used in connection with overheads and underground transmission and
distribution of electricitiy, communication s, sounds and signals (collectively, the “Facilities”),
together with right of access to the same and the right, from time to time, to trim or remove trees,
bushes, roots and saplings and to clear obstructions from the surface and subsurface as may be
reasonably required incident to the grant herin given, in, over, under, across, along and upon the
surface of the Subject Property; and
WHEREAS, the Village desires to grant the requested easement to ComEd, and the
Village is vested with the authority to authorize such grant of easement for the purposes stated
therein; and
WHEREAS, ComEd has presented to the Village a “Grant of Easement” which sets forth
the mutual understandings and agreement of the parties thereto, a copy of which is attached
hereto as “Exhibit A”; and
WHEREAS, the Village has determined that is is in the best interest of the Village and its
residents to that said Grant of Easement be executed;
NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees of the
Village of Kenilworth, Cook County, Illinois, as follows:
Section 1. Recitals. The foregoing recitals are incorporated into and made a part of
this Resolution by this reference.
35
Section 2. Acceptance of Terms and Conditions. The Village President and Board
of Trustees hereby agree to the terms and conditions set forth in the Grant of Easement
in the form as substantially shown as Exhibit A.
Section 3. Execution of Easement Agreement . The Village President and the
Deputy Village Clerk are hereby authorized and directed to execute and attest, on behalf
of the Village, the easement agreement substantially in the form as shown as Exhibit A
herein.
Passed this 20th day of January, 2026.
AYES:
NAYS:
ABSENT:
ABSTAIN:
Approved this 20th day of January, 2026.
Cecily Kaz
Village President
Attest:
Michael Gagnon
Village Clerk
36
EXHIBIT A
GRANT OF EASEMENT
37
GRANT OF EASEMENT
Village of Kenilworth, Illinois, an
Illinois municipal corporation
(“Grantor”), in consideration of the
sum of One Dollar and other valuable
consideration, receipt of which is
hereby acknowledged, hereby grant(s)
and conveys to COMMONWEALTH EDISON
COMPANY, an Illinois Corporation,
(together with its licensees,
successors and assigns,
collectively, “Grantee”), an
easement to construct, operate,
repair, maintain, modify,
reconstruct, replace, supplement,
relocate and remove, from time to
time, poles, guys, anchors, wires, cables, fiber, conduits, manholes, transformers,
pedestals, splice boxes, or other facilities used in connection with overhead and underground
transmission and distribution of electricity, communications, sounds and signals
(collectively, the “Facilities”), together with right of access to the same and the right,
from time to time, to trim or remove trees, bushes, roots and saplings and to clear
obstructions from the surface and subsurface as may be reasonably required incident to the
grant herein given, in, over, under, across, along and upon the surface of property situated
in Section 28, Township 42 North, Range 13 East of the Third Principal Meridian in Cook
County, Illinois (the “Property”), further described below:
An Easement as legally described on the Exhibit “A” and as depicted on the Exhibit
“B”, both Exhibits attached hereto and made a part hereof.
PROPERTY ADDRESS: 400 Green Bay Road, Kenilworth, IL 60043
P.I.N. 05-28-225-002
Obstructions shall not be placed over the Facilities or in, upon or over the Easement Area
without prior written consent of Grantee. After installation of any Facilities, the grade
of the Property shall not be altered in a manner so as to interfere with the operation and
maintenance thereof. After completing any work authorized by this Agreement, including,
installing or maintaining the Facilities, Grantee shall make reasonable efforts to restore
the Easement Area to the condition as close as reasonably and practicably possible to the
condition that existed immediately prior to undertaking such work, reasonable wear and tear
excepted.
This instrument prepared by and when recorded, return to Christopher Brown, 1701 Golf Rd.
Suite 1-700, Rolling Meadows, Illinois 60008, on behalf of Commonwealth Edison Company.
Complete the Appropriate Acknowledgments on Following Page Hereof
38
The Grantor represents and warrants to the Grantees that Grantor is the true and lawful
owner of the Property and has full right and power to grant and convey the rights conveyed
herein.
The Easement is binding upon and shall inure to the benefits of the heirs, successors,
assigns, and licensees of the parties hereto.
IN WITNESS WHEREOF, the Grantor, Village of Kenilworth, Illinois, has caused this
instrument to be executed on its behalf this _____ day of ___________________, 20___.
By:______________________________________
NAME: ___________________________________
TITLE: __________________________________
State Of ______________
County Of ______________
I, the undersigned, a Notary Public in and for the said County and State aforesaid, do
hereby certify that ______________ _________________, known to be the __________________
of Village of Kenilworth, Illinois, personally known to me to be the same persons whose
name is subscribed to the foregoing instrument, appeared before me this day in person and
acknowledged that he/she signed and delivered said instrument as their own free and
voluntary act and as the free and voluntary act of said Village, for the uses and purposes
therein set forth.
GIVEN under my hand and NOTARIAL SEAL this day of , 20___.
___________________________________
Notary Public
39
Exhibit “A”
An easement over part of the Northeast Quarter of Section 28, Township 42 North, Range 13
East of the Third Principal Meridian described as follows:
Commencing at the most Northerly corner of Lot 1 in Davis’ Subdivision, according to the
plat thereof recorded March 12, 2024 as Document No. 2407209005; thence perpendicular to
the Easterly line of said Lot 1 North 57 degrees 41 minutes 02 seconds East, 70.00 feet
to the Easterly line of Green Bay Road and the Point of Beginning; thence North 32
degrees 18 minutes 58 seconds West along said Easterly line, 16.57 feet; thence North 57
degrees 41 minutes 02 seconds East, 11.00 feet; thence South 32 degrees 18 minutes 58
seconds East, 25.00 feet; thence South 57 degrees 41 minutes 02 seconds West, 11.00 feet
to said Easterly line of Green Bay Road; thence North 32 degrees 18 minutes 58 seconds
West along said Easterly line, 8.43 feet to the Point of Beginning, all in Cook County,
Illinois.
PERMANENT TAX NUMBER(S): 05-28-225-002
40
41
Request for Board Action
Agenda Item: V.B.3
Staff Contact: Jordan Schmidt, Management Analyst
Subject: Presentation and a Resolution to Accept Planning Technical Assistance Services
Delivered by the Chicago Metropolitan Agency for Planning
Summary: In 2025, the Village applied for and was awarded a technical assistance grant from
the Chicago Metropolitan Agency for Planning (CMAP). The purpose of the grant is to assist the
Village in the development of a comprehensive capital improvement plan (CIP). As part of the
agreement CMAP will assign an engineering firm to partner with the Village to complete the
CIP. To participate in the program, the Village is required to contribute $8,000, which was
budgeted for in the FY 2026 Budget. It is recommended the Board authorize execution of the
Intergovernmental Agreement with CMAP.
Background of Matter: On an annual basis, CMAP solicits applications for technical assistance
grants to assist municipalities in the development of key programs. In 2025, the Village applied
for and was awarded a grant to assist the Village in the development of a comprehensive CIP. To
participate in the program, the Village is required to contribute $8,000, which was budgeted for
in the FY 2026 Budget.
As part of the grant, CMAP will select an engineering firm to work with the Village on the
development of a multi-year CIP. The project will include the following items:
- Establishment of capital asset inventories
- Introduction of a standardized tool & process to inventory assets and rate their condition
- Introduction of a standardized tool and process to internally propose capital projects
- Establishment of criteria for evaluation of potential capital projects
- Professional advisement on budgeting for capital projects
- Community engagement to understand resident and stakeholders’ capital project needs
- Facilitation of capacity-building training for municipal officials and staff
Since the Village already has processes in place for several of these items, the project will lend an
opportunity for an outside party to review and provide recommendations on improving our
processes. In connection with the planned water rate study for 2026, the project also offers an
excellent opportunity to receive professional assistance in reviewing funding for upcoming
significant capital projects such as water main replacements, lead service line replacements, and
road reconstruction projects. The project is anticipated to take 24 months from start to completion.
As part of the project, staff will bring reoccurring status updates to the Public Works Committee.
Additionally, anytime significant decisions need to be made on the path of the project, staff will
seek Public Works Committee input.
Considered By: Date:
Village Board 01/20/26
Village of
42
Financial Impact: The Village has adequate funding in the FY 2026 Budget to enter into the
Intergovernmental Agreement.
Total Contract Amount $8,000
Budget Amount (FY26) $8,000
Variance: $0 – On Budget
GL Number: Capital Fund: 27-400-5322
Recommendation: It is recommended that the Village Board review and approve a Resolution
Approving the Intergovernmental Agreement Between the Village of Kenilworth and CMAP to
accept planning technical assistance services.
Attachments:
• Resolution Accepting Planning Technical Assistance Services from the Chicago
Metropolitan Agency for Planning
• Intergovernmental Agreement
43
VILLAGE OF KENILWORTH
RESOLUTION NO. 2026-__
A RESOLUTION TO ACCEPT PLANNING TECHNICAL ASSISTANCE SERVICES
DELIVERED BY THE CHICAGO METROPOLITAN AGENCY FOR PLANNING
WHEREAS, the Village of Kenilworth (“Village”) has applied for technical assistance
services through the Chicago Metropolitan Agency for Planning (“CMAP”), for the Kenilworth
Capital Improvement Plan (CIP) project; and
WHEREAS, the Village’s request for such assistance has been recommended by CMAP
as a priority project; and
WHEREAS, CMAP adopted the ON TO 2050 Plan as the long-range regional
comprehensive plan for the seven-county Chicago region, encompassing Cook, DuPage, Kane,
Kendall. Lake, McHenry and Will counties, and is providing technical assistance as a means of
advancing the plan’s implementation and CMAP priorities; and
WHEREAS, pursuant to the provisions of the IGA, the Village agrees to pay CMAP the
local financial contribution in the amount of $8,000; and
WHEREAS, the Village accepts the offer of staff assistance services by CMAP and
recognizes that these services are provided for the purpose of advancing the implementation of
ON TO 2050 and other CMAP priorities; and
WHEREAS, the Village recognizes that provisions that govern the administration of
technical assistance services, and, if necessary, the discontinuance of such services, are
included in the IGA. and
WHEREAS, the Village and CMAP have agreed on the Intergovernmental Agreement
(“IGA”), attached hereto as Exhibit A, that will guide technical assistance services to be provided
by CMAP;
NOW, THEREFORE BE IT RESOLVED BY by the President and Board of Trustees
of the Village of Kenilworth, Cook County, Illinois, as follows:
Section 1. Recitals and Exhibits. The foregoing recitals and all exhibits attached to
this Resolution are incorporated as though fully set forth in this Section.
Section 2. Agreement Approved. The Agreement attached as Exhibit A is approved
and the Village President and Village Clerk are authorized to execute the Agreement the on the
Village’s behalf.
Section 3. Authority. The Village Manager is authorized and directed to take all steps
necessary to implement and enforce the Agreement’s terms.
Section 4. Effective Date. This Resolution shall take effect immediately upon its
passage and approval as provided by law.
[Signature Page Follows]
44
Passed this 20th day of January 2026.
AYES:
NAYS:
ABSENT:
ABSTAIN:
Approved this 20th day of January 2026.
Cecily Kaz
Village President
Attest:
Michael Gagnon
Village Clerk
45
EXHIBIT A
IGA
46
A260039
V________
WP2026.024
A26-0039
INTERGOVENMENTAL AGREEMENT FOR
TECHNICAL ASSISTANCE
Kenilworth Capital Improvement Plan
THIS AGREEMENT is hereby entered by and between the Chicago Metropolitan Agency for
Planning, (hereinafter "CMAP"), a body politic and corporate created by the State of Illinois, and
Kenilworth (hereinafter "GOVERNMENTAL BODY")
The terms and conditions of this agreement are as follows:
1. Purpose. The purpose of this agreement is to facilitate technical assistance to the
GOVERNMENTAL BODY for Kenilworth Capital Improvement Plan which incorporates the
regional ON TO 2050 principles of resilience, inclusive growth, and prioritized investment
(hereinafter “PROJECT”)
2. Term of Agreement. The project is to commence as soon as practicable after the execution
of this Agreement and shall be undertaken and completed in such sequence as to assure their
expeditious completion pursuant to the terms of this Agreement. The project is expected to
take twenty-four (24) months from the date of kick-off.
2. Scope of Services and Responsibilities. CMAP and the GOVERNMENTAL BODY hereby agree
to the scope of services and responsibilities set forth in the Solution Clarification Summary
included herein as Attachment 1 and Attachment 2.
3. Agreements. The General Provisions included herein as Attachment 3, apply to and are
incorporated into this Agreement with full force and effect.
4. Local contribution. The GOVERNMENTAL BODY will be responsible for a contribution in the
amount of $8,000 which will be deposited in the Local Technical Assistance Contribution Fund.
CMAP will invoice the GOVERNMENTAL BODY and the payment will be due on 10/31/2026. The
contribution and invoice will be pursuant to Attachment 4 herein.
List of Attachments:
Attachment 1: Solution Clarification Summary
Attachment 2: Technical Assistance Roles and Responsibilities
Attachment 3: General Terms and Conditions
Attachment 4: Technical Assistance Local Contribution
47
APPROVALS:
For the GOVENMENTAL BODY:
Authorized Signature: ____________________________________ Date: ________________
Name/Tile: __________________________________________________________________
Government Name:
______________________________________________________________
Government Address: ____________________________________________________________
Attest:
Authorized Signature: ____________________________________ Date: ________________
Name/Tile: __________________________________________________________________
CMAP:
Authorized Signature: ____________________________________ Date: ________________
Erin Aleman, Executive Director
Chicago Metropolitan Agency for Planning
433 West Van Buren Street, Suite 450 Chicago IL 60607
Attest:
Authorized Signature: ____________________________________ Date: ________________
Name/Tile: __________________________________________________________________
48
Page 1
Attachment 1: SOLUTION CLARIFICATION SUMMARY
WORK PLAN NO. PROJECT TITLE DATE
2026.024 Kenilworth Capital Improvement Plan (CIP) 12/16/2025
Project Name: Kenilworth Capital Improvement Plan (CIP)
Project Lead: Prithvi Hegde
Executive Sponsor/Customer: Stephane Phifer/Patrick Day
SOLUTION OVERVIEW
The Village of Kenilworth (Community Partner) values long-range community and strategic planning and seeks to create a multi-
year Capital Improvement Plan (CIP).
On CMAP’s behalf, selected consultants, in collaboration with municipal staff and officials, and community stakeholders, and with
limited support from CMAP staff, will lead the creation of a multi-year CIP through a process that includes establishment of capital
asset inventories across municipal departments, setting of criteria for evaluation of potential capital projects, professional
advisement on budgeting for capital projects, and capacity-building trainings for municipal officials and staff on the essential skills
to effectively participate in the creation and maintenance of the CIP.
MUST-HAVE CHARACTERISTICS
At a minimum, the Village of Kenilworth Capital Improvement Plan (CIP) project must include:
1. Creation of a multi-year Capital Improvement Plan (CIP) document that:
a. Is created through a process that includes establishment of capital asset inventories across municipal departments
b. Includes introduction of a standardized tool & process (across departments) to inventory existing assets, a nd
condition of assets (to the extent such data is known to the municipality)
c. Includes introduction of a standardized tool & process (across departments) to internally propose capital projects for
inclusion in the municipal budget
d. Includes setting of criteria for evaluation of potential capital projects
e. Includes professional advisement on budgeting for capital projects, with attention to understanding phasing of
capital projects
f. Includes substantive community engagement to understand resident and stakeholders’ capital project needs a nd
priorities and incorporate in CIP criteria and the capital projects selected for inclusion in the CIP
g. Includes facilitation of capacity-building trainings for municipal officials and staff on the essential skills to effectively
participate in the creation and maintenance of the CIP
2. Community partnership. Providing access to relevant internal data, reports, past plans, stakeholders, and other information
necessary to successfully conduct the project, as well as time spent reviewing draft materials for comment and participation
in project meetings
NOT PART OF THE SOLUTION / EXCLUSIONS
1. Cash funding of capital projects.
2. Asset condition assessments cannot be performed by CMAP or consultant selected for creation of this CIP.
49
ATTACHMENT 2: CMAP TECHNICAL ASSISTANCE ROLES AND RESPONSIBILITIES
Signatories of this Agreement (hereinafter jointly “Party” or “Parties”) certify that these roles and
responsibilities for this project will be adhered to unless amended in writing.
The Parties shall perform and carry out in a satisfactory and proper manner, as determined by
CMAP, the following:
1. Project Charter. The PROJECT and all work performed by CMAP will be consistent with the
Project Charter included herein as “ATTACHMENT 1”. Changes to the project charter must be
jointly agreed to by the Parties.
2. Scope of Work. Parties will jointly determine and document the PROJECT scope of work,
timelines, public engagement schedules, commitment of non-staff resources by either Party, and
other elements prior to beginning the work outlined in the scope of work. CMAP may also request
GOVERNMENTAL BO DY assistance to establish expectations and performance goals for the
PROJECT and process. Said scope of work shall be finalized and mutually agreed to by both parties
prior to beginning work.
a) Parties shall jointly agree to changes to PROJECT scope or timelines; CMAP may discontinue the
PROJECT if major deviations, changes, or expansions of scope or schedule occur.
b) All work performed by CMAP staff must be related to the scope of work.
3. Roles and Relationship. Parties shall perform and carry out in a satisfactory and proper manner,
as determined by CMAP the following:
a) CMAP shall assign staff to work with local governments and the community as part of the Local
Technical Assistance program.
b) GOVERNMENTAL BODY shall assign a lead person to be the main point of contact for CMAP staff.
c) CMAP staff will report on the overall scope of work and day -to-day activities to the
GOVERNMENTAL BODY.
d) Assigned staff are CMAP employees and CMAP is responsible for evaluating their performance.
e) CMAP management, in addition to the CMAP staff assigned to the PROJECT, may periodically
check-in (frequency to be determined based on need) with GOVERNMENTAL BODY.
f) CMAP is responsible for assigning relevant CMAP staff to work on the PROJECT (based on
availability, skills, familiarity with the area, and subject matter expertise).
g) GOVERNMENTAL BODY understands that CMAP assistance is provided as a means of advancing
the implementation of ON TO 2050 the long -range regional comprehensive plan for the seven-
county Chicago region, encompassing Cook, DuPage, Kane, Kendall, Lake, McHenry and Will
counties.
4. Access to resources. CMAP staff will have full access to CMAP data and other resources,
including specialized CMAP staff (for advanced mapping, data, outreach, communications, or
topic-specific expertise). The GOVERNMENTAL BODY will provide CMAP access to data as follows:
a) The GOVERNMENTAL BODY will provide access to relevant staff who will need to be involved in
the PROJECT, and will ensure that they allocate sufficient time to the PROJECT.
50
b) The GOVERNMENTAL BODY will provide access to all relevant internal data, reports, and other
information necessary to successfully complete the PROJECT.
c) The GOVERNMENTAL BODY’s leadership (key staff, planning commissioners, board members,
other elected officials, other decision-makers) commits to participate in the PROJECT and allocate
sufficient time at meetings (Plan Commission meetings, GOVERNMENTAL BOD Y meetings, etc.)
to ensure due consideration so the PROJECT is successful.
5. Demonstration of local support. GOVERNMENTAL BODY agrees to provide an inclusive, open,
safe and welcoming environment in which to conduct meetings and outreach events.
a) The GOVERNMENTAL BODY shall be responsible for working with CMAP to identify members for
a steering committee or similar oversight group.
b) If public outreach is a component of the PROJECT, the GOVERNMENTAL BODY agrees to
participate in public outreach and engagement efforts; including assisting in dissemination of
PROJECT and meeting information, attending and assisting at public meetings, an d providing key
stakeholder contact information.
6. Project management and review. CMAP will have lead responsibility for project management.
CMAP shall in all reasonable ways coordinate and work with the GOVERNMENTAL BODY staff as
the PROJECT proceeds. The GOVERNMENTAL BODY in all reasonable ways shall cooperate with
CMAP and the consultant, if any. CMAP shall require the consultant, if any, to provide the
GOVERNMENTAL BODY with all of the consultants’ deliverables, if any, at the time they are
delivered to CMAP. CMAP and GOVERNMENTAL BODY shall notify the other of all scheduled
PROJECT related meetings with the consultant, if any, to enable the other to attend the meetings
if desired.
a) Allocation of CMAP staff to the PROJECT will vary over time based on project timeline and work
needs.
b) In order to maintain PROJECT progress and momentum, the GOVERNMENTAL BODY agrees to
review and provide feedback on PROJECT deliverables in a timely manner, in accordance with the
agreed upon timelines.
c) GOVERNMENTAL BODY agrees to make best faith effort to adopt and implement the completed
plan within agreed upon timelines.
51
ATTACHMENT 3: CMAP GENERAL TERMS AND CONDITIONS
Signatories of this Agreement certify that these conditions and procedures and terms and the
conditions and procedures specific to this project will be adhered to unless amended in writing.
1. Complete Agreement. This Agreement including all exhibits and other documents
incorporated or referenced in the Agreement, constitutes the complete and exclusive
statement of the terms and conditions of the Agreement between CMAP and the
GOVERNMENTAL BODY and it supersedes all prior representations, understandings and
communications regarding this PROJECT. The validity in whole or in part of any term or
condition of this Agreement shall not affect the validity of other terms or conditions of
this Agreement.
a) Either Party’s failure to insist in any one or more instances upon the performance of
any terms or conditions of this Agreement shall not be construed as a waiver or
relinquishment of said Party’s right to such performance by the other Party or to
future performance of such terms or conditions and the other Party’s obligation in
respect thereto shall continue in full force and effect. The GOVERNMENTAL BODY
shall be responsible for having taken steps reasonably necessary to ascertain the
nature and location of the work, and the general and local conditions that can affect
the work or the cost thereof. Any failure by the GOVERNMENTAL BODY to do so will
not relieve it from responsibility for successfully performing the work without
additional expense to CMAP.
b) CMAP and the GOVERNMENTAL BODY assume no responsibility for any
understanding or representations made by any of its officers, employees or agents
prior to the execution of this Agreement, unless such understanding or
representations by both parties are expressly stated in this Agreement.
c) Changes: CMAP and the GOVERNMENTAL BODY may from time to time order work
suspension or make any change in the general scope of this Agreement including,
but not limited to changes, as applicable, in the drawings, specifications, delivery
schedules or any other particular of the description, statement of work or provisions
of this Agreement. If any such change causes an increase or decrease in the cost or
time required for performance of any part of the work under this Agreement, CMAP
shall promptly notify the GOVERNMENTAL BODY and a written amendment will be
prepared for Agreement between CMAP and the GOVERNMENTAL BODY for
changes in scope, time and/or costs. No amendments are effective until there is a
written Agreement that has been signed by both parties.
d) Changes to any portion of this Agreement shall not be binding upon CMAP and the
GOVERNMENTAL BODY except when specifically confirmed in writing by an
authorized representative of CMAP and an authorized representative of the
GOVERNMENTAL BODY.
52
e) For its convenience, CMAP reserves the right to extend the Term of this agreement.
Any changes to the Term of this Agreement shall not be binding until specifically
confirmed in writing by authorized representatives of both parties.
2. Compliance/Governing Law. The terms of this Agreement shall be construed in
accordance with the laws of the State of Illinois. Any obligations and services performed
under this Agreement shall be performed in compliance with all applicable state and
federal laws.
3. Availability of Appropriation (30 ILCS 500/20-60). This Agreement is contingent upon
and subject to the availability of funds. CMAP, at its sole option, may terminate or
suspend this Agreement, in whole or in part, without penalty, if the Illinois General
Assembly, the state funding source, or the federal funding source fails to make an
appropriation sufficient to pay such obligation, or if funds needed are insufficient for
any reason. The GOVERNMENTAL BODY will be notified in writing of the failure of
appropriation or of a reduction or decrease in appropriation.
4. Allowable Charges. No expenditures or charges shall be included in the cost of the
PROJECT that are: (i) contrary to provisions of this Agreement or the latest budget
approved by a duly-authorized official of CMAP and the GOVERNMENTAL BODY; (ii) not
directly for carrying out the PROJECT; (iii) of a regular and continuing nature, except that
of salaries and wages of appointed principal executives of CMAP who have not been
appointed specifically for the purposes of directing the PROJECT, who devote official
time directly to the PROJECT under specific assignments, and respecting whom
adequate records of the time devoted to and services performed for the PROJECT are
maintained by CMAP may be considered as proper costs of the PROJECT to the extent of
the time thus devoted and recorded if they are otherwise in accordance with the
provisions hereof; or (iv) incurred without the consent of CMAP after written notice of
the suspension or termination of any or all of CMAP’s obligations under this Agreement.
5. Audits. The records and supportive documentation for all completed projects are
subject to an on-site audit by CMAP and the GOVERNMENTAL BODY. CMAP and the
GOVERNMENTAL BODY reserve the right to inspect and review, during normal working
hours, the work papers of the independent auditor in support of their audit report.
6. Access to Records. CMAP and the GOVERNMENTAL BODY shall maintain, for a minimum
of three years after the completion of the Agreement, adequate books, records and
supporting documents related to the Agreement which shall be made available for
review upon request. Failure to maintain the books, records and supporting documents
required by this Section shall establish a presumption in favor of CMAP for the recovery
of any funds paid by CMAP under the Agreement for which adequate books, records
and supporting documentation are not available to support their purported
disbursement. In addition:
53
a) If any litigation, claim or audit is started before the expiration of three-year period,
the records shall be retained until all litigation, claims or audit findings involving the
records have been resolved.
b) Records for nonexpendable property acquired with federal funds shall be retained
for three (3) years after its final disposition.
c) CMAP shall include in all subcontracts, if any, under this Agreement a provision that
CMAP and the GOVERNMENTAL BODY will have full access to and the right to
examine any pertinent books, documents, papers, and records of any such
subcontractors involving transactions related to the subcontract for three (3) years
from the final payment under that subcontract except that:
1) If any litigation, claim or audit is started before the expiration of the three-year
period, the records shall be retained until all litigation, claims or audit findings
involving the records have been resolved.
2) Records for nonexpendable property acquired with federal funds shall be
retained for three (3) years after its final disposition.
The term “subcontract” as used in this clause excludes purchase orders not
exceeding $2,500.
7. Procurement Procedures. All procurement transactions for Contractual Services,
Commodities and Equipment shall be conducted in a manner that provides maximum
open and free competition. The GOVERNMENTAL BODY and CMAP shall also meet the
following minimum procedural requirements.
a) Subcontracting: Subcontracting, assignment or transfer of all or part of the interests
of CMAP concerning any of the obligations covered by this Agreement is prohibited
without prior written consent of the GOVERNMENTAL BODY.
b) Procurement of Goods or Services: For purchases of products or services with any
Agreement funds that cost more than $2,500 but less $10,000, CMAP shall obtain
price or rate quotations from an adequate number (at least three) of qualified
sources. Procurement of products or services with any Agreement funds that are in
excess of $10,000 will require CMAP to use the Invitation for Bid process or the
Request for Proposal process. In the absence of formal codified procedures, the
procedures of CMAP will be used. CMAP may only procure products or services from
one source with any Agreement funds if: (1) the products or services are available
only from a single source; or (2) after solicitation of a number of sources,
competition is determined inadequate.
c) Records. CMAP and the GOVERNMENTAL BODY shall maintain records sufficient to
detail the significant history of procurements. These records shall include, but are
not necessarily limited to: information pertinent to rationale for the method of
54
procurement, selection of contract type, contractor selection or rejection, and basis
for the cost or price.
d) No CMAP or GOVERNMENTAL BODY employee shall participate in the procurement
of products or services if a conflict of interest, real or apparent, would be involved.
No employee shall solicit or accept anything of monetary value from bidders or
suppliers.
8. Equipment Inventory. An inventory of non-expendable personal property having a
useful life of more than two years and an acquisition cost of $500 or more is subject to
periodic inspection by CMAP and the GOVERNMENTAL BODY.
9. Method of Payment. PROJECT expenditures are paid directly from federal, state funds
or other funds. Because CMAP is responsible for obtaining federal reimbursement for
PROJECT expenditures when applicable, it is necessary that CMAP monitor all
procedures and documents which will be used to claim and support PROJECT-related
expenditures.
10. Suspension. If the GOVERNMENTAL BODY fails to comply with the special conditions
and/or the general terms and conditions of this Agreement, CMAP may, after written
notice to the GOVERNMENTAL BODY, suspend the Agreement, pending corrective
action by the GOVERNMENTAL BODY. If corrective action has not been completed
within sixty (60) calendar days after service of written notice of suspension, CMAP shall
notify the GOVERNMENTAL BODY in writing that the Agreement has been terminated by
reason of default in accordance with Paragraph 11 “Termination” herein.
11. Termination.
a) This Agreement may be terminated in whole or in part in writing by CMAP or the
GOVERNMENTAL BODY for its convenience (hereinafter termed “Termination for
Convenience”), provided that the terminating party provides not less than fourteen
(14) calendar days written notice (delivered by certified mail, return receipt
requested) of intent to terminate to the respective address set forth on the signature
page of this Agreement.
b) Upon notice of termination by either party, CMAP shall (i) promptly discontinue all
services affected (unless the notice directs otherwise) and (ii) deliver or otherwise
make available to the GOVERNMENTAL BODY all data, drawings, specifications,
reports, estimates, summaries and such other information and materials as may have
been accumulated by CMAP in performing this Agreement, whether completed or in
process.
c) No Further Liability. Each party agrees that the rights of termination hereunder are
absolute and it has no right to a continued relationship with the other after
termination (except as expressly stated herein). Neither party shall incur any liability
whatsoever for any damage, loss or expense of any kind suffered or incurred by the
other (or for any compensation to the other) arising from or incident to any
55
termination of this Agreement by such party that complies with the terms of the
Agreement whether or not such party is aware of any such damage, loss or expense.
12. Remedies. Except as may be otherwise provided in this Agreement, all claims,
counterclaims, disputes and other matters in question between CMAP and the
GOVERNMENTAL BODY arising out of or relating to this Agreement or the breach
thereof will be decided by arbitration. If the parties hereto mutually agree, a request for
remedy may be sought from a court of competent jurisdiction within the State of Illinois,
County of Cook.
13. Equal Employment Opportunity. The GOVERNMENTAL BODY and CMAP will comply
with Executive Order 11246 entitled “Equal Employment Opportunity,” as amended by
U.S. Department of Labor regulations (41 CFR Part 60) and the Illinois Human Rights Act
or the Rules and Regulations of the Illinois Department of Human Rights. In connection
with the execution of this Agreement, the GOVERNMENTAL BODY and CMAP shall not
discriminate against any employee or an applicant for employment because of race,
color, religion, sex, sexual orientation, marital status, national origin or ancestry,
citizenship status, age, physical or mental disability unrelated to ability, military status
or an unfavorable discharge from military service. The GOVERNMENTAL BODY and
CMAP shall take affirmative actions to ensure that applicants are employed and that
employees are treated during their employment without regard to their race, color,
religion, sex, sexual orientation, marital status, national origin or ancestry, citizenship
status, age, physical or mental disability unrelated to ability, military status, or an
unfavorable discharge from military service. Such actions shall include, but not be
limited to, employment, promotion, demotion, transfer, recruitment, recruitment
advertising, layoff, termination, rates of pay, other forms of compensation, and
selection for training or apprenticeship. The GOVERNMENTAL BODY and CMAP shall
cause the provisions of this paragraph to be inserted into all subcontractors’ work
covered by this Agreement so that such provisions will be binding upon each
subcontractor, provided that such provisions shall not apply to contracts or subcontracts
for standard commercial supplies or raw materials.
14. Small and Minority Business Enterprise. In connection with the performance of this
Agreement the GOVERNMENTAL BODY will cooperate with CMAP in meeting CMAP’s
commitments and goals with respect to the maximum utilization of small business and
minority business enterprises, and will use its best efforts to ensure that small business
and minority business enterprises shall have the maximum practicable opportunity to
compete for work under this Agreement.
15. Political Activity. No portion of funds for this Agreement shall be used for any partisan
political activity or to further the election or defeat of any candidate for public office.
16. Prohibited Interest.
a) No officer or employee of CMAP or the GOVERNMENTAL BODY and no member of
its governing body and no other public official of any locality in which the PROJECT
objectives will be carried out who exercises any functions or responsibilities in the
56
review or approval of the undertaking or carrying out of such objectives shall (i)
participate in any decision relating to any contract negotiated under this Agreement
which affects his personal interest or the interest of any corporation, partnership or
association in which he is, directly or indirectly, interested; or (ii) have any financial
interest, direct or indirect, in such contract or in the work to be performed under
any such subcontract.
b) No member of or delegate of the Illinois General Assembly or the Congress of the
United States of America, and no federal Resident Commissioner, shall be admitted
to any share hereof or to any benefit arising herefrom.
c) The GOVERNMENTAL BODY and CMAP warrants and represents that no person or
selling agency has been employed or retained to solicit or secure this Agreement,
upon an agreement or understanding for a commission, percentage, bonus,
brokerage or contingent fee, or gratuity, excepting its bona fide employees. For
breach or violation of this warranty CMAP or the GOVERNMENTAL BODY shall have
the right to annul this Agreement without liability or, at its discretion, to deduct
from the Agreement price or consideration, or otherwise recover, the full amount of
such commission, percentage bonus, brokerage or contingent fee, or gratuity.
17. Conflict of Interest. In order to avoid any potential conflict of interest, the
GOVERNMENTAL BODY and CMAP agree during the term of this Agreement not to
undertake any activities which could conflict directly or indirectly with the interest of
CMAP or the GOVERNMENTAL BODY. The GOVERNMENTAL BODY shall immediately
advise CMAP of any such conflict of interest. CMAP shall make the ultimate
determination as to whether a conflict of interest exists.
18. Ownership of Documents/Title of Work. All documents, data and records produced by
the GOVERNMENTAL BODY or CMAP in carrying out the obligations and services
hereunder, without limitation and whether preliminary or final, shall become and
remains the property of CMAP and the GOVERNMENTAL BODY. CMAP and the
GOVERNMENTAL BODY shall have the right to use all such documents, data and records
without restriction or limitation and without additional compensation. All documents,
data and records utilized in performing research shall be available for examination by
CMAP or the GOVERNMENTAL BODY upon request. Upon completion of the services
hereunder or at the termination of this Agreement, all such documents, data and
records shall, at the option of CMAP or the GOVERNMENTAL BODY, be appropriately
arranged, indexed and delivered to CMAP or the GOVERNMENTAL BODY.
19. Publication. CMAP and the GOVERNMENTAL BODY shall have royalty-free, nonexclusive
and irrevocable license to reproduce, publish, disclose, distribute, and otherwise use, in
whole or in part, any reports, data or other materials specifically prepared under this
Agreement, and to authorize other material to do so. The GOVERNMENTAL BODY and
CMAP shall include provisions appropriate to effectuate the purpose of this clause in all
contracts for work under this Agreement.
57
20. Confidentiality Clause. Except as required pursuant to a validly issued subpoena, lawful
request by a governmental entity or any applicable laws, including without limitation
any Federal or State Freedom of Information Acts, any documents, data, records, or
other information given to or prepared by the GOVERNMENTAL BODY or CMAP
pursuant to this Agreement shall not be made available to any individual or organization
without prior written approval by CMAP or the GOVERNMENTAL BODY. All information
secured in connection with the performance of services pursuant to this Agreement
shall be kept confidential unless disclosure of such information is approved in writing by
CMAP or the GOVERNMENTAL BODY. Nothing in these restrictions interfere with the
lawful obligation to respond to FOIA requests.
21. Reporting/Consultation. The GOVERNMENTAL BODY shall consult with and keep CMAP
fully informed as to the progress of all matters covered by this Agreement. CMAP shall
consult with and keep the GOVERNMENTAL BODY fully informed as to the progress of all
matters covered by this Agreement.
22. Identification of Documents. All reports, maps, and other documents completed as part
of this Agreement, other than documents exclusively for internal use within CMAP or
the GOVERNMENTAL BODY offices, shall carry the following notation on the front cover
or a title page or, in the case of maps, in the same area which contains the name of the
GOVERNMENTAL BODY. "This material was prepared in consultation with CMAP, the
Chicago Metropolitan Agency for Planning, (http://www.cmap.illinois.gov)."
23. Force Majeure. Either party shall be excused from performing its obligations under this
Agreement during the time and to the extent that it is prevented from performing by a
cause beyond its control including, but not limited to: any incidence of fire, flood; acts of
God; commandeering of material, products, plants or facilities by the Federal, state or
local government; national fuel shortage; or a material act of omission by the other
party; when satisfactory evidence of such cause is presented to the other party, and
provided further that such nonperformance is unforeseeable, beyond the control and is
not due to the fault or negligence of the party not performing.
24. Independent Contractors. Contractor’s relationship to CMAP and the GOVERNMENTAL
BODY in the performance of this Agreement is that of an independent contractor.
Contractor’s personnel performing work under this Agreement shall at all times be
under the contractor’s exclusive direction and control and shall be employees of
contractor and not employees of CMAP or the GOVERNMENTAL BODY. Contractor’s
shall pay all wages, salaries and other amounts due its employees in connection with
this Agreement and shall be responsible for all reports and obligations respecting them,
including, but not limited to, social security, income tax withholding, unemployment
compensation, workers' compensation insurance and similar matters
25. Federal, State and Local Laws. CMAP and the GOVERNMENTAL BODY warrant that in
the performance of this Agreement they shall comply with all applicable federal, state
and local laws, statutes and ordinances and all lawful orders, rules and regulations
promulgated thereunder. Since laws, regulations, directives, etc. may be modified from
time-to-time, CMAP and the GOVERNMENTAL BODY shall be responsible for compliance
58
as modifications are implemented. The CMAP or the GOVERNMENTAL BODY’S failure to
comply shall constitute a material breach of this contract.
26. Hold Harmless and Indemnity. Each party to this Agreement shall indemnify, defend
and hold harmless the other party to this Agreement, and its officers, officials, directors,
employees, volunteers and agents from and against any and all claims (including
attorney’s fees and reasonable expenses for litigation or settlement) for any loss, or
damages, bodily injuries, including death, damage to or loss of use of property caused
by the negligent acts, omissions or willful misconduct of the respective party and its
officers, officials, directors, employees, agents, volunteers, subcontractors or suppliers,
in connection with or arising out of the performance of this Agreement.
27. Equal Employment Opportunities -- Affirmative Action Sexual Harassment. CMAP and
the GOVERNMENTAL BODY must comply with the Illinois Board of Human Rights Act and
rules applicable to public funds, including equal employment opportunity, refraining
from unlawful discrimination, and having written sexual harassment policies (775 ILCS
5/2-105).
28. International Boycott. The GOVERNMENTAL BODY and CMAP certify that neither or any
substantially owned affiliate is participating or shall participate in an international
boycott in violation of the U.S. Export Administration Act of 1979 or the applicable
regulations of the U.S. Department of Commerce. This applies to contracts that exceed
$10,000 (30 ILCS 582).
29. Forced Labor. The GOVERNMENTAL BODY and CMAP certify it complies with the State
Prohibition of Goods from forced Labor Act, and certifies that no foreign-made
equipment, materials, or supplies furnished to CMAP or the GOVERNMENTAL BODY
under this Agreement have been or will be produced in whole or in part by forced labor,
or indentured labor under penal sanction (30 ILCS 583).
30. Subcontracts. Any subcontractors or outside associates or contractors required by
CMAP in connection with the services covered by this Agreement will be limited to such
individuals or firms as were specifically identified and agreed to during procurement
negotiations. Contractors and subcontractors, and any substitutions in or additions to
such subcontractors, associates or contractors, will be subject to the prior approval of
CMAP and the GOVERNMENTAL BODY.
All contracts and subcontracts for work under this Agreement shall contain those
applicable provisions which are required in this Agreement.
The Contractor, if any, may not subcontract services agreed to under this Agreement
without prior written approval of CMAP and the GOVERNMENTAL BODY.
59
Revised 8/23/2024
Page 1 of 1
ATTACHMENT 4: TECHNICAL ASSISTANCE LOCAL CONTRIBUTION
The GOVERNMENTAL BODY will be responsible for a contribution in the amount identified in the agreement
which will be deposited in the Local Technical Assistance Contribution Fund.
The Local Technical Assistance Contribution Fund supports the development and promotion of the goals and
policies of the Regional Comprehensive Plan. The contribution shall be expended to address the development
and transportation challenges in the northe astern Illinois region and to support those functions and programs
consistent with the Regional Planning Act (70 ILCS 1707). This includes but is not limited to technical assistance
programs, policy development, research and data collection, public engagement, and planning in areas such as
land use, housing, economic development, preservation of natural resources, transportation, water supply,
flood control, sewers, and governance in the form of model ordinances and best practices that may be enacted
by local governments.
Payment will be made within thirty (30) days of receipt of invoice unless there is a discrepancy regarding the
invoice. Transfer of funds shall be made electronically.
60
Request for Board Action
Agenda Item: V.B.4
Staff Contact: Michael Blue, Teska Associates
Heather McFarland, Administration
Jordan Schmidt, Administration
Subject: Action on the Following Items Pertaining to a Request for a Planned Unit
Development at 515-519 Park Drive:
a) Public Hearing to Consider a Certificate of Approriateness
b) Ordinance Granting a Special Use Permit to RED3 Development LLC for a
Preliminary Planned Unit Development and Approving a Certificate of
Appropriateness
Summary: RED3 Development LLC submitted an application for a preliminary Planned Unit
Development (PUD) and Certificate of Appropriateness (CoA) in September 2025. The request
considers redeveloping the properties at 515-519 Park Drive to construct a four-story mixed-use
building. Both the Architectural Review (ARC) and Plan (PC) commissions have recommended
denial of the request. The Village Board should take the feedback from both commissions into
consideration and take action on the request.
Background of Matter: An application for a preliminary PUD and CoA was submitted to the
Village late last summer for a new four-story mixed-use development at 515-519 Park Drive. The
proposed mixed-use development would include two (2) commercial spaces on the ground floor,
with entrances facing Park Drive, and a total of seven (7) luxury dwelling units on the 2nd and
3rd floors, including a single penthouse dwelling unit that is setback on the 4th floor. A total of 14
on-site parking spaces are proposed in a shared garage accessed from the alley. The proposal
would require the demolition of the two existing structures shown below.
Existing Buildings (L-R: 519 Park Drive, 515 Park Drive)
Considered By: Date:
Village Board 01/20/26
Plan Commission
Plan Commission
Arch. Review Commission
Arch. Review Commission
12/09/25
12/01/25
10/28/25
10/15/25
Village of
61
Proposed Building, Front Facade
PUD Process Overview
PUD regulations offer communities a different and more flexible approach to development. PUD
regulations generally require developers to provide an elevated level of aesthetic design and/or
public amenities in exchange for relief from the strict enforcement of underlying zoning
standards. Instead of rigidly applying zoning requirements, such as setbacks, communities have
more latitude to negotiate with a developer seeking PUD approval over public benefits the
community may receive. The intent being to provide a legal framework for communities and
developers to negotiate mutually beneficial development outcomes based on standards in
the Village Zoning Ordinance.
The Village’s review process for PUD requests begins with a neighborhood meeting, conducted
by the applicant, where the concept is shared with the community for feedback. Next, an
application is submitted for a preliminary PUD, which presents the project at a higher level.
Detailed plans are commonly provided during the final PUD review that follows the preliminary
analysis.
The ARC evaluates the PUD application first for compliance with the Village’s Business District
Design Guidelines aimed at preserving the character of that area. Their feedback is forwarded to
the Plan Commission, and their recommendation to the Village Board. The Plan Commission
reviews next to determine whether the proposal meets Village standards for special use permits
and PUDs and makes a recommendation to the Village Board. Special use and PUD standards
consider impacts a proposal may have on a community and whether those impacts are balanced
by the public benefit received.
Once the commissions have finished their review, the Village Board votes to approve or deny the
application. If approved, the applicant begins detailing their plans to return for final PUD
approval. Only after that process is complete can the applicant submit for a building permit.
Neighborhood Meeting
A neighborhood meeting to present the development concept at 515-519 Park Drive
was facilitated by the developer on August 14, 2025. Feedback from those in attendance was
mixed, with several concerns raised on the development’s impact to light supply, parking, and
traffic. The applicant relayed that the building height was critical to the project’s viability.
62
Architectural Review Commission – Certificate of Appropriateness Review
The ARC discussed the requested CoA and proposed development over the course of two
meetings on October 15, 2025, and October 28, 2025. The Commission’s discussion focused on
several elements, including the massing of the building in relationship with the neighboring
properties, roof design, color of the building materials, garage access, and the visibility of the
4th floor trellis. The applicants attempted to address the Commissioners concerns through the
following modifications to their design:
• Modifications taken to soften bulk and height of building
o Middle portions of building were stepped back by 6 inches
o Cornice and roof elements lowered
o Mansard roof corners revised
• Modified the color palette to a softer/warmer tone compared to stark white and black
• All mansard corners modified to reflect true mansard style, which also serves to reduce
the bulk of the building
• Additional views/renderings provided from different neighboring perspectives
• Added chamfered corners (notched) to garage access, and set entrance back 2 feet to
match neighboring garage apron access
• Trellis height lowered by 1 foot, stepped back from front facade, and profile modified to
reduce its visibility from the street level.
The Commission expressed support generally for the design of the building but stated concerns
that the proposed height was not in keeping with the intent of the Business District Design
Guidelines due to the visual impact and real impacts to light on adjacent residential
properties. During the public meetings, the Commission also received public comments with
concerns about the size and scale of the building, impacts of the development on pedestrian
safety, and the overall fit of the development in the neighborhood.
The petitioner requested the Commission take a vote, regardless of the outcome, such that the
proposal would then proceed for discussion with the Plan Commission. The Commission voted
to recommend denial (5 for denial, 1 abstention, 1 absent) of the certificate of appropriateness
based on the presented design.
Plan Commission – PUD Request Review
The Plan Commission met on December 1, 2025, and December 9, 2025, to review the
preliminary PUD request. The proposal, which was modified following the ARC’s review,
presented reduced bulk at the front facade through setbacks at the 2nd and 3rd stories, a modified
mansard roof design, elimination of trellises on the 4th floor facing the street, and an
overall reduced building height (including ornamentation) by 2 ft. 2 in.
Written public comments as well as public comments shared at the meeting were extensive, but
focused on concerns about the appropriateness of the proposed height at the location, that
additional traffic in the alleys would increase congestion, and that the demand for parking along
Park Drive would increase, further increasing congestion along a narrow one-way lane.
63
515-
519 Park Drive Proposed Building Height – 46'4”
Commissioners discussed the application at length, with mixed perspectives on the request.
Elements of the proposal, such as building height, the appearance of the portion of the building
facing the alley, and failure of the request to receive a positive ARC
recommendation represented the majority of concerns. Some commissioners also noted the
limited number of developments for their review over the past several years and urged the
community to keep an open mind. In consideration of the Village’s goals to revitalize the
Business District, the commissioners felt it was important to move forward with the request to
gain momentum.
Following discussion, the Commission voted to recommend denial of the PUD request to the
Village Board (4 for denial, 2 for approval).
Building Review Commission – Demolition Review
Concurrent to the review of the preliminary PUD request, the applicant is also pursuing
approval of a reduced demolition stay for the building at 515 Park Drive. Typically, all
properties proposing demolition are required to request a demolition permit through the
Building Review Commission. In the case of 515 and 519 Park Drive, a survey of properties in
the B Business District was prepared in 2022. This survey identified 515 Park Drive as a
property of Special Importance. 519 Park Drive was not found to be of special importance.
Because this determination was already made, a one-year demolition stay is required and began
automatically upon submittal the request to demolish the property. The stay expires on October
6, 2026. The application submitted to the Building Review Commission (BRC) requested a
reduced stay, dependent on approval of a Final PUD Plan. This request was initially scheduled
for October 29, 2025, then December 15, 2025, however, the request has been continued to a date
to be determined at the applicant's request.
PUD Request Summary
Proposal Overview
Location 515-519 Park Drive
Use First floor retail, residential floors 2-4
Zoning District B-Business District
Height Four stories, 46’4”
64
Total Lot Size 8,610.36 sq. ft.
Setbacks 0
Dwelling Units Seven units: Three on floors 2 & 3, one penthouse on floor 4
Dwelling Size Floors 2-3: 2,101 sq. ft. (2), 2,419 sq. ft. (2), 2,527 sq. ft. (2)
Penthouse:3,424 sq. ft. (1)
Retail Spaces Two retail spaces
Retail Space Size Space 1: 1,535 sq. ft., Space 2: 916 sq. ft.
Parking Spaces 14 parking spaces for condominium owners
Zoning Relief • Exceeds height limit (35’) by 11’4”
• Exceeds height limit with special use permit approval
(40’) by 6’4”
Proposed Demolition • 515 Park Drive – Requires BRC review; within one
year demolition stay period
• 519 Park Drive – No special approval required
Process Step Outcome
Neighborhood Meeting Completed
ARC Recommendation Rec. to Deny
Plan Commission Recommendation Rec. to Deny
Village Board TBD – Options to approve, approve with conditions, remand
to ARC / PC with feedback for further review, or deny
Building Review Commission TBD
Financial Impact: None. Costs associated with the review and recordation are recoverable
through the Village’s escrow requirements.
Recommendation: The Village Board should consider the commission’s recommendations to
deny the requests for a CoA and PUD, and take action to either approve, approve with
conditions, deny, remand to the ARC and/or PC with direction for further discussion, or continue
the consideration of the requests to a future meeting.
Attachments:
• Proposed Ordinance
• ARC Findings of Fact
o 10/28/25 ARC Meeting Packet
• PC Findings of Fact
o 12/09/25 PC Meeting Packet
65
1
ORDINANCE NO. _____
AN ORDINANCE GRANTING A SPECIAL USE PERMIT AND
APPROVING A CERTIFICATE OF APPROPRIATENESS FOR A
PRELIMINARY PLANNED UNIT DEVELOPMENT AT 515-519 PARK DRIVE
(515-519 PARK DRIVE – RED3 DEVELOPMENT PARK SERIES, LLC)
Passed by the Board of Trustees this _____ day of January, 2026
Printed and published in pamphlet form by
authority of the President and Board of Trustees this ___ day of January, 2026
VILLAGE OF KENILWORTH, ILLINOIS
__________________________________
Village Clerk
66
2
ORDINANCE NO. _____
AN ORDINANCE GRANTING A SPECIAL USE PERMIT AND
APPROVING A CERTIFICATE OF APPROPRIATENESS FOR A
PRELIMINARY PLANNED UNIT DEVELOPMENT AT 515-519 PARK DRIVE
(515-519 PARK DRIVE – RED3 DEVELOPMENT PARK SERIES, LLC)
WHEREAS, RED3 Development Park Series, LLC, (“Applicant”), on behalf of the is the
contract purchaser for the properties commonly known as 515 Park Drive and 519 Park Drive
(“Property”), which are legally described in Exhibit A; and
WHEREAS, the Property is currently located in the B – Business District Zoning District
(“B District”) pursuant to the Kenilworth Zoning Ordinance, 1969, as amended (“ Zoning
Ordinance”), and is occupied by a vacant building at 519 Park Drive, and a building occupied by
a retail use at 515 Park Drive; and
WHEREAS, on or about September 25, 2025, the Applicant submitted an application in
accordance with Zoning Ordinance Section 153.242 (“Application”) seeking approval of a
certificate of appropriateness (“COA”) and special use for a preliminary planned unit development
(“PUD”) to construct a four-story mixed -use building on the Property (collectively, the
“Improvements”); and
WHEREAS, Zoning Ordinance Sections 153.245 and 153.242(B) authorize the Village President
and Board of Trustees to approve COA requests and special uses for PUDs; and
WHEREAS, the Village of Kenilworth Architectural Review Commission (“ ARC”) met on
October 15, 2025, and October 28, 2025, to consider the Application; and
WHEREAS, on October 28, 2025, the ARC found and determined that the COA
Application did not satisfy the Zoning Ordinance’s standards and criteria, and voted 5-1-1 to
recommend that the President and Board of Trustees deny the COA Application; and
WHEREAS, pursuant to notice published in the Chicago Sun Times on November 13,
2025, and notice otherwise distributed in accordance with the Zoning Ordinance, the Village of
Kenilworth Plan Commission (“PC”) held public hearings on December 1, 2025, and December
9, 2025 to consider the Special Use Application and the Variation Application; and
WHEREAS, on December 9, 2025, the PC found and determined that the Application was
did not satisfy the relevant standards and criteria from the Zoning Ordinance and voted 6 -0 to
recommend that the President and Board of Trustees deny the PUD Application; and
WHEREAS, the President and Board of Trustees have received and reviewed the findings
of the ARC and the PC, and find and determine that (a) the Application satisfies the standards set
forth in Zoning Ordinance Section 153.242(C); 153.245(G); and 153.246(C); and (b) approving
the Application is in the best interests of the Village and the public, subject to the conditions,
restrictions, and provisions of this Ordinance;
NOW, THEREFORE, BE IT ORDAINED by the President and Board of Trustees of the
Village of Kenilworth, Cook County, Illinois, as follows:
67
3
SECTION 1. Recitals, Exhibits, and Findings. The recitals listed above and all
exhibits attached to this Ordinance are incorporated into this Ordinance as though fully set forth
in this Section. The President and Board of Trustees hereby adopt the findings set forth in Exhibit
B and Exhibit C concerning the Application.
SECTION 2. Certificate of Appropriateness Approved . Subject to and
contingent upon the conditions, restrictions, and provisions set forth in Section 4 of this Ordinance,
a COA to allow construction of the Improvements on the Subject Property is hereby approved in
accordance with Zoning Ordinance Section 153.242.
SECTION 3. Special Use Permit Approved. Subject to and contingent upon the
conditions, restrictions, and provisions set forth in Section 4 of this Ordinance, a special use permit
for a preliminary PUD to allow construction , occupancy and use of the Improvements on the
Subject Property, including the Zoning Ordinance deviations noted below, is hereby approved in
accordance with and pursuant to Zoning Ordinance Sections 153.245 and 153.246.
A. Building Height. A deviation from Zoning Ordinance Section 153.096 to
allow a building height of 46’4”, which is 11’4” greater than what is permitted by
Code.
SECTION 4. Approval Conditions. The approvals granted by Sections 2 and 3
shall be, and are hereby, expressly subject to and contingent upon each of the following terms,
conditions, and restrictions:
A. Final Approval . Before constructing any of the Improvements, the
Applicant must obtain Village approval of a final PUD plan and final COA in accordance
with applicable Village ordinances, rules, and procedures, including, without limitation,
Zoning Ordinance Section 153.246.
B. Compliance with Application and Laws . The operation, use, and
maintenance of the Property and all Improvements located thereon shall comply with the
Application and all applicable Village codes, ordinances, and regulations, including,
without limitation, the Village’s standards regulating nuisances set forth in Kenilworth
Village Code Chapter 94, and the Zoning Ordinance.
C. Compliance with Plans . The Applicant’s final PUD plan depicting the
Improvements, including, without limitation, all buildings, site improvements, and
landscaping on the Property must substantially conform to: Park Place 515-519 Park Drive
Kenilworth, IL 60043 PUD Application Revised / 12/03/2025, copies of which are attached
hereto as Group Exhibit D (collectively, “Plans”).
SECTION 5. Failure to Comply with Conditions . Upon the failure or refusal of the
Applicant to comply with any or all of the conditions, restrictions or provisions of this Ordinance,
the approval granted in Section 2 and Section 3 of this Ordinance will, at the sole discretion of the
Village President and Board of Trustees, by ordinance duly adopted, be revoked and become null
and void; provided, however, that the Village President and Board of Trustees may not so revoke
such approval unless it first provides the Applicant with 60 days advance written n otice of the
reasons for revocation and an opportunity to be heard at a regular meeting of the Board of
Trustees. In the event of revocation, the use of the Property will be governed solely by the
regulations of the B District, as the same may, from time to time, be amended. Further, in the
event of such revocation of the approval, the Village Manager and Village Attorney are hereby
68
4
authorized and directed to bring such zoning enforcement action as may be appropriate under
the circumstances.
SECTION 6. Amendment to Special Use Permit. Any amendment to the special use
permit granted in Section 3 of this Ordinance may be requested by the Applicant after the effective
date of this Ordinance may be granted only pursuant to the procedures, and subject to the
standards and limitations, provided in the Zoning Ordinance.
SECTION 7. Recordation; Binding Effect. The privileges, obligations, and provisions
of each and every section of this Ordinance are for the benefit of and bind the Applicant, unless
otherwise explicitly set forth in this Ordinance or as approved by the Village President and Board
of Trustees. Nothing in this Ordinance will be deemed to allow this Ordinance to be transferred
to any person or entity other than the Applicant without the approval of the Village President and
Board of Trustees . A copy of this Ordinance will be recorded with the Cook County Clerk,
Recordings Division.
SECTION 8. Effective Date.
A. This Ordinance will be effective only upon the occurrence of all of the
following events:
1. Passage by the President and Board of Trustees of the Village of
Kenilworth by a majority vote in the manner required by law;
2. Publication in pamphlet form in the manner required by law; and
3. The filing by the Applicant with the Village Clerk, for recording in the
Office of the Cook County Clerk, Recordings Division, along with a
copy of this Ordinance, of an executed unconditional agreement
and consent, in the form of Exhibit E attached to this Ordinance, as
the same may be revised with the approval of the Village Attorney,
to accept and abide by each and all of the terms, conditions, and
limitations set forth in this Ordinance, and to indemnify the Village
for any claims that may arise in connection with the approval of this
Ordinance.
B. In the event that the Applicant does not file with the Village Clerk a fully
executed copy of the unconditional agreement and consent referenced in Section 8.A.3
above within 90 days after the effective date of this Ordinance, the Village President and
Board of Trustees will have the right, in their sole discretion, to declare this Ordinance null
and void and of no force or effect.
SECTION 9. Superseder. In the event a conflict exists between the terms of this
Ordinance and any other ordinance or resolution of the Village, the terms of this Ordinance shall
govern.
Signatures on next page
69
5
Passed this ___ day of January, 2026.
AYES:
NAYS:
ABSENT:
ABSTAIN:
Approved this ____ day of January, 2026.
ATTEST:
Village President
Village Clerk
70
6
Exhibit A
Legal Description of 515-519 Park Drive
71
7
Exhibit B
Certificate of Appropriateness Findings of Fact
Design Guidelines
(1) Architectural Style and Considerations
a. Following the architectural intent of Kenilworth’s early planners as well as
consideration for the limited size of the Business District, development within the
Business District should consist of historic English architectural styles. New
buildings need not be historic replicas, but should offer high quality and compatible
interpretations of Tudor, Tudor Revival, and other historic English styles present
within Kenilworth. Interpretations should foster a residential feel for the Business
District as a whole.
b. In the limited instances where renovation should be considered, the Village
encourages improvements that lead to a design which is consistent with the
desired architectural style outlined. For those existing buildings with a quality
design of another period that is not Tudor, Tudor Revival, or other historic English
influenced designs, the building may be renovated to be consistent with the style
in which it was originally built.
c. The prominent building at the southern entrance to the Business District, 400
Green Bay Road, exhibits the traditional architectural details of smaller structural
bays and massing, limited building heights, variety in roof forms, mix of materials
and speci al attention to detailing and fenestration proportions and patterns.
Buildings within the Business District should incorporate similar traditional
architectural details.
d. Buildings within the Business District should reflect sensitivity to the immediate site
surroundings and the Village-wide character.
e. All exterior walls of buildings should be treated with consistent architecture, details,
and materials.
f. The image below highlights some of the fundamental elements of Tudor Revival
and other historic English styles for development that is consistent with anticipated
uses in the Business District.
VILLAGE BOARD RESPONSE: Although the proposed development does not clearly represent
a true to form Tudor, Tudor Revival or other historical English architectural style, it was found to
be a modern interpretation. Adjustments were made to the design, in particular the mansard roof
design, in response to feedback seeking the design to be more in line with a traditional mansard
roof design.
(2) Placement and Orientation
a. Buildings in the Business District should be positioned at the property line and
occupy the entire lot -width to assist in creating a “streetwall” that enhances
pedestrian comfort and maintains pedestrian scale.
b. Gaps between buildings in the streetwall should be avoided, except where
pedestrian access to rear parking is designed and planned for.
c. In addition to providing pedestrian scale, a street wall contributes to the pedestrian
interest and circulation of the area. To this end, long, blank facades are
discouraged.
d. Buildings throughout the Business District should have strong pedestrian
orientation, providing opportunities for window shopping, and outdoor dining.
72
8
e. Corner buildings should take advantage of their prominent locations with angled,
rounded or recessed corner entrances. Buildings located on corner lots should be
built out to both the front and corner side property lines. Given that the Business
District is only one lot deep, corner lots also play an important role in the transition
between the commercial and residential districts.
f. The placement of mid -block buildings at odd or irregular angles to the street is
prohibited.
VILLAGE BOARD RESPONSE: The proposed developments placement and orientation are
consistent with the design guidelines.
(3) Building Height
a. Building Height Should be 2 ½ to 3 ½ stories in height (25’ – 35’)
b. When buildings are adjacent to residential neighbors, consideration should be
given to setting back portions of the buildings located at the second story or above
from the rear and side to soften the bulk and visual scale of the building. This may
include terracing or stepping rooflines, in keeping with the overall architectural style
of the building.
c. Careful consideration should be given to building elements at the ground level to
ensure that the buildings have human scale and create a harmonious environment.
VILLAGE BOARD RESPONSE: Portions of the building exceeding 40’ will be setback to
minimize the visual impact. Available light supply is generally in line with what would be expected
for a building constructed by-right.
(4) Building Materials
a. Authentic and high quality building materials are desired to convey the image of
the Village. These include natural color brick, stone, cast or carved stone, terra
cotta, and timbers with limited stucco on portions of Tudor -styled buildings.
Decorative met al and stone are desirable as finish materials for flashing,
ornamentation around doors and windows, and cornices
b. Brick, stone and cast stone should be the primary building materials on all exterior
walls of buildings in the Business District. Brick and stone selections should be
designed in a compatible range of colors rather than a single color selection for an
entire building, in order to avoid a flat and modern appearance.
c. Buildings obtain some of their character from the mix of materials, and creative
use of material combinations is encouraged to break up the massing. The number
of façade colors should be minimized to maintain a unified district.
d. Stucco may be permitted only when used on second floor walls or above. Exterior
insulation finish systems (EIFS) or Dryvit, wall siding of all types, metal/vinyl wall
panels, and wood siding are prohibited within the Business District.
e. Detail should be included on each building such as stone, brickwork and metalwork
to highlight windows and doors.
f. Overhead doors for the covered parking for upper floor condominiums are
preferred to replicate stile and rail paneled doors if they are in view of the public or
pedestrian way. Overhead doors are allowed only on building openings that face
alleys.
g. Building color should be compatible with the area’s character and enhance the
building’s visual appeal. Color should be used to complement the materials of a
façade and to highlight architectural features. Primary, bright, or excessively
brilliant colors are discouraged.
73
9
VILLAGE BOARD RESPONSE: Proposed building materials include manufactured Indiana
limestone, wood clad / aluminum casement windows, ¾” Cementitious stucco, James Hardie
composite panel & trim, Davinci roofscapes composite slate roof, and wood pergola/trellis. The
proposed colors are “buff”, “castle gray”, and a warm grayish brown.
(5) Facades
a. Exterior side walls visible from the public way shall be finished in materials similar
to the front facade.
b. The relationship of horizontal banding among buildings unifies the street elevation
and, the division of a building façade into horizontal bands provides human scale
and proportion to the façade.
c. A building base, middle and top should be strongly articulated through materials,
details and changes in the plane of the wall. Retail storefronts should be
differentiated from the façade of the upper stories. Storefront systems, awnings,
and entrance doors should be harmonious.
d. The use of decorative building elements consistent with the architectural style in a
rhythmic pattern is encouraged to break up large building masses. Columns,
pilasters, window placement and other architectural features should be used to
divide facades of large buildings into several smaller vertical segments. Structural
elements and bays should be architecturally expressed on the façade to add
interest, scale, proportion, and detail.
e. Multiple storefronts that are part of the same building should have complementary
façade designs, particularly with respect to color, cornice line and other
architectural details, and decorative materials. As used in these guidelines, facade
shall mean the exterior wall of the building.
VILLAGE BOARD RESPONSE: Vertical and horizontal design elements are introduced to break
down the overall massing. Storefront awnings and doorways and consistent in design. Second
and third stories are partially setback to help differentiate between ground floor retail and
condominiums.
(6) Doors and Entrances
a. The entrances and their architectural details should be influenced by the overall
architectural style of the building, its intended use, and be appropriately sized and
designed. The entrance should be proportionately scaled to the overall building
design.
b. Front entrances and retail storefronts should be prominent, easily discernible,
attractive and inviting to pedestrians, and add visual interest to the street.
c. The primary business entrance should be evident from the public way and
differentiated from the semi-public and private residential entrances.
d. Primary business entrances should consist of full glass panel doors and transoms
where appropriate. Recessed doorways are encouraged to provide cover from the
elements and to allow safer opening of doors.
VILLAGE BOARD RESPONSE: The proposed doorways and entrances are consistent with the
design guidelines. The business entrances consist of full glass panel doors, and are evident from
the public right-of-way.
74
10
(7) Windows and Bays
a. Windows and window details should be appropriate for the architectural style of
the building, and true divided lites are encouraged where appropriate.
b. Large ground -floor bays and display windows on facades with bulkheads and
transom lites are strongly encouraged within the Business District.
c. Upper floor balconies, decks, terraces, and bay windows are appropriate on all
sides of buildings, but should not extend or overhang into the public right -of-way
without Village approval.
d. Windows on the upper floors’ exterior walls are encouraged and should be
consistent with the architectural style of the building. Upper floor windows should
appear to be “punched” openings within a solid wall, rather than a continuous row
of windows separated only by their frames. Upper floor windows shall be recessed,
not flush with the surface of the building.
e. Window glass should be clear or slightly tinted. Dark -tinted, spandrel, frosted,
back-painted, and smoked glass are discouraged on the front of buildings. If part
of the architectural design, they should be used sparingly and only where
necessary to screen the function of the interior space (such as storage areas,
kitchens, bathrooms). Mirrored or reflective glass is not permitted within the
Business District.
f. Expanses of walls should not be visible from the public right-of-way. Consideration
should be given to incorporating features such as display windows, and material
and color variations.
g. Ground floor windows can be used for displays; however business owners shall
allow full and unobstructed views into their businesses. Completely obstructing
windows from the interior of a building with shelving, display cases, or other objects
is discourag ed. features such as display windows, and material and color
variations.
VILLAGE BOARD RESPONSE: The proposed ground floor windows are full glass panel doors.
The upper floor windows are recessed rather than flush with the surface of the building. No
expanses of walls are visible from the public right-of-way, as windows wrap the entire building.
(8) Roofs and Dormers
a. Rooflines, roof slopes, and architectural details should complement the building’s
architectural style.
b. Dormers and gables with purposeful space are encouraged to be incorporated
within the roof structure of a building, and not just applied decorative elements.
Shed dormers should not extend for more than 50% of the façade length.
c. Sloped mansard style roofs are prohibited within the Business District.
d. Roof parapets shall be utilized only in achieving the appropriate gabled
architecture.
e. Cornices and other decorative detail are strongly encouraged along the rooflines
of buildings.
f. Eaves should have depth and should be appropriate to the building’s architectural
style as to create shade and shadow on the upper floor of the building. Eaves
should be of sufficient depth to accommodate ornamentation such as decorative
brackets, dentils and cornices.
g. Slate roofing is encouraged in the Business District, although clay tile and
simulated slate or tile may also be permitted provided they are consistent with the
architectural style and of high quality. Cedar shingles, cedar shakes, and asphalt
shingles, including architectural shingles, are not encouraged.
75
11
h. Flashing, gutters, and downspouts are encouraged to be copper or other high
quality, metal materials.
VILLAGE BOARD RESPONSE: The proposed pitched roofs and traditional gabled forms attempt
to reflect Kenilworth’s architectural vernacular. A more traditional mansard roof was incorporated
into the design to reflect recommendations from the Architectural Review Commission. The use
of slate tiles is proposed for roofing materials. Cornices were incorporated and lowered to help
soften the bulk of the building.
(9) Awnings and Canopies
a. Awnings are desired elements as they protect pedestrians from the elements, add
color and visual interest to the street, and contribute significantly to an area’s
pedestrian scale and interest.
b. Canopies should only be utilized for entrances to the residential portions of
buildings within the Business District.
c. Awnings and canopies shall be made of a canvas or durable fabric material that
can be easily cleaned. Hard plastic, vinyl, metal or other materials are prohibited.
d. Internal illumination of awnings is prohibited.
e. Awnings shall be constructed and erected so that the lowest portion of the
projecting frame and descending skirt shall not be less than 7’6” above the level of
the sidewalk or ground located below the awning.
f. Awnings may project over the public way but they should not be within two feet of
the curb line of a public street. A recommended minimum awning projection is
three feet; however the projection should be consistent with the style of awning
and scale of the building.
g. Where several storefronts are developed as a single building, they should have
awnings of a similar style, alignment, and color in order to maintain a sense of
visual continuity.
h. Awnings and canopies should fit within the frame of the storefront window; they
should not hide the building’s façade, distort its proportions, or cover architectural
features.
i. Awnings may be fixed or retractable. Retractable awnings must be kept either in
the fully projected position or the fully closed position. Fixed awnings are to have
concealed rigid metal frames. Retractable awnings should have a canopy cover
and retractable rollers mounted to the building
j. The color of awnings and canopies shall complement and enhance the overall
color scheme of the building façade. Recommended colors are solid black, dark
green and dark blue.
VILLAGE BOARD RESPONSE: There are proposed awnings and canopies over the proposed
business and residential entry ways. The proposed awnings and canopies are consistent with the
design guidelines.
(10) Lighting
a. Appropriate and judicious lighting of a building’s façade is encouraged to identify
stores and businesses, promote a sense of safety and security, and highlight
prominent buildings and building features in the Business District. Excessive up -
lighting shall be avoided to reduce light pollution
b. Lighting shall be used to illuminate pedestrian and parking areas.
c. Lighting shall provide a sense of safety without having a negative effect on
neighboring properties and shall be located, aimed, lamped, or shielded to
76
12
minimize glare, sky glow, and stray light. Lights should not shine across property
lines, especially along alleys and into residential neighborhoods.
d. Lighting in the rear or side of Business District properties, including parking lot and
building lighting, shall not spill over into adjacent residential areas.
e. Building lighting fixtures should be subtle and understated, and consistent with the
architectural style of the Business District.
f. Fluorescent lighting with exposed fluorescent lamps is discouraged in street-level
interiors where visible from the public way.
g. Light fixtures and poles for parking areas should be consistent with the Village’s
architectural style.
h. Exterior lighting with an incandescent quality is encouraged, regardless of the lamp
type, to create a warm atmosphere.
VILLAGE BOARD RESPONSE: Exterior lighting fixtures will use full cut‐off and shielded designs
so that no glare reaches adjacent properties. Safe lighting levels will be provided at the public
street level.
(11) Parking, Overhead Doors and Service Areas
a. When possible, parking lots should be located behind buildings. Parking lots in
front of buildings are discouraged. Infill redevelopment of existing surface parking
lots located between buildings is encouraged.
b. Access to parking lots should be provided from alleys to maximize the
development potential of the Business District and to maintain a safe and
comfortable pedestrian environment along Green Bay Road.
c. New curb cuts and access drives are discouraged along Green Bay Road, and
redundant and unnecessary curb cuts should be eliminated.
d. Parking lots should be screened from view from all public right -of-way except
alleys, including sidewalks and streets, through the use of landscaping and low
masonry walls. Planters and landscaped areas should buffer parking and service
areas from adjacent uses. Plantings should consist of low evergreen and
deciduous shrubs planted in conjunction with low -growing annual or perennial
plants and groundcover. Large expanses of exposed mulch shall be avoided.
e. Parking lot landscaping should include “landscape islands” at a ratio of
approximately one per fifteen parking spaces. Landscape islands should consist
of canopy trees (initially 3 to 4 inches in caliper), attractive groundcover, and/or
decorative shrubs (initially 2 to 3 feet in height).
f. All parking lots should be well marked, sufficiently lit, provided with proper drainage
and include clearly marked pedestrian pathways.
g. In order to reduce or minimize paved parking areas, shared parking is encouraged
where adjacent buildings have interior uses which offset each other in their use of
the parking lot subject to the requirements of the zoning ordinance. For example,
a business with daytime employee and shopper parking may create an opportunity
for evening use of the same lot by evening shoppers or restaurant patrons.
h. Trash receptacles, dumpsters and service areas shall be located inside the primary
building or be fully enclosed by masonry walls and screened with landscaping
i. Service areas and overhead doors are to be located off secondary streets or alleys.
All service areas are to be treated with masonry walls and/or appropriate
landscaping at 6 feet in height from the ground level.
j. Decorative metal fencing should be used where appropriate to enhance and define
open spaces, landscaped areas and building entrances. Such fencing should not
be more than four feet in height. Chain link fences are prohibited.
77
13
k. The rear of commercial buildings shall be well kept, with rear exterior walls being
comparable to the facades. Secondary rear entrances to stores and shops are
encouraged in blocks where public parking or pedestrian walkways are located
behind the buildings.
l. Mechanical equipment must not be visible from the public right -of-way. Roof -
mounted equipment should be located so as not to be visible from the primary or
secondary approach and screened from residential areas.
m. Grade-level mechanical and utility equipment should be screened from public view
with an enclosure or screening element integral to the building design, masonry
walls or landscaping.
VILLAGE BOARD RESPONSE: The proposed parking garage is built into the ground floor of the
development, with entry via the alley. The garage access includes chamfered corners to setback
the entry to match neighboring garage apron access. The parking garage is intended for residents
of the building only. Ductwork, HVAC, waste handling will be located away from adjacent
residential windows and public view. The design will include screening of visible service or
mechanical areas, landscaping buffers, and archit ectural transitions so that the building’s form
does not seem harsh or jarring to adjacent properties.
(12) Other Considerations
a. Sidewalk seating and tables for cafes are encouraged. However, these
improvements should not overwhelm the sidewalk nor impede pedestrian
circulation along the sidewalk.
b. Parkway landscaping should consist of salt-tolerant street trees, groundcover and
perennials. Street trees and other landscaping along the public rights -of-way
should be protected from motorized and pedestrian traffic by street curbs and tree
grates.
c. Landscaping should be healthy and attractive. Maintenance programs performed
on a regular basis should be established as part of new development approvals.
Maintenance should include turf mowing, periodic fertilization, pruning, and the
clean-up of litter and debris.
d. Decorative planters may be placed at Business District entrances only where they
will not impede the safe flow of pedestrian traffic.
e. Throughout the design and building process, the Village encourages a sustainable
approach that balances environmental responsiveness, resource efficiency, and
cultural and community sensitivity, with the owner’s economic viability. Using the
USGBC LEED Rating System as a tool or guide is a good measure of a project’s
sustainable performance and benefits the property owner, the residents, and the
planet.
VILLAGE BOARD RESPONSE: The proposed development showcases sidewalk seating for
potential businesses. Proposed landscaping includes planters and rooftop plantings.
78
14
Exhibit C
Findings of Fact for PUD Application
(1) Special use standards. No special use for a planned development shall be
recommended or granted pursuant to this section unless the applicant shall establish
that, in addition to the standards set forth in this section 153.246(C), the proposed
development will meet each of the standards made applicable to special uses pursuant
to § 153.245(G).
(1) The necessity for the public convenience at the particular proposed location.
VILLAGE BOARD RESPONSE: The development provides two ground floor retail spaces
within walking distance the Metra Station, Pace Bus stops and nearby residential
properties. Seven condominiums are proposed in total, offering residents an opportunity
to downsize within the community near public transportation. Limited opportunities for
luxury condominiums exist in Kenilworth. The proposed retail and residential space are in
line with Kenilworth’s objectives stated in the Green Bay Road Corridor Vision.
(2) The effects of the proposed design, location and operation on the public health, safety
and welfare.
VILLAGE BOARD RESPONSE: The development includes 14 off-street parking spaces
that are accessed through the alley, which will mitigate traffic impacts. Traffic generated
will be similar or less than what would otherwise be generated by the two existing
commercial spaces. The proposed development is 70% less commercial space than the
existing buildings, and residents occupying the seven units will utilize the off-street parking
spaces.
(3) Injury to the value of other property in the neighborhood in which it is proposed to be
located.
VILLAGE BOARD RESPONSE: The development will bring fresh retail space and
contribute to beautifying the B–District. The enhanced aesthetic and community amenities
will add value to neighboring properties.
(4) Interference with the use and enjoyment of neighboring properties.
VILLAGE BOARD RESPONSE: The development will offer the community an enhanced
streetscape and new retail in the B -District. The property at 519 Park Drive has been
vacant for several years, limiting the community’s ability to enjoy the commercial corridor.
(5) Compatibility with permitted uses in the district in which it is proposed to be located.
VILLAGE BOARD RESPONSE: Above floor residential is a permitted use in the B -
District. The uses of the first floor retail space will be evaluated once occupants are
identified.
79
15
(6) Increased traffic congestion on public ways or increased parking required on public
ways.
VILLAGE BOARD RESPONSE: The development includes 14 off-street parking spaces
that are accessed through the alley, which will mitigate traffic impacts. Traffic generated
will be similar or less than what would otherwise be generated by the two existing
commercial spaces. The proposed development is 70% less commercial space than the
existing buildings, and residents occupying the seven units will utilize the off-street parking
spaces.
(7) Damage or destruction of natural scenic or historic features of significance to the
village or the immediate neighborhood.
VILLAGE BOARD RESPONSE: No natural scenic or historic features will be impacted as
part of the development. While the architecture of 515 Park Drive is notable, it is not
specifically of historic merit.
(8) In the case of playground equipment, in addition to the foregoing applicable factors,
its proximity to and effect on neighboring properties, its expected intensity of use, and the
consistency of the equipment and its expected use with play equipment c ustomarily
associated with a residential use.
VILLAGE BOARD RESPONSE: This standard is not relevant to the Application, as no
playground equipment is proposed.
(2) Minimum area of development. The applicant shall have the burden of
establishing that the subject property is of sufficient size and shape to be planned and
developed as a unified whole capable of meeting the objectives of planned unit
developments pursuant to this section.
VILLAGE BOARD RESPONSE: Portions of the building exceeding 40’ will be setback to
minimize the visual impact. Available light supply is generally in line with what would be expected
for a building constructed by-right. Parking beyond what is required by the Village Code has been
included, which will offset traffic impacts.
(3) Unified ownership required. The entire property proposed for planned
development treatment shall be in single ownership or under unified control as to
ensure that the entire property will be developed as a unified whole. All the owners of
the property shall be included as joint applicants on all applications and all approvals
shall bind all owners. The violation of any owner as to any tract shall be deemed a
violation as to all owner and all tracts.
VILLAGE BOARD RESPONSE: The property will be under ownership by RED3 Development,
LLC.
(4) Compliance with village code required. Construction and improvements with
any planned unit development shall comply with all applicable village ordinances. Any
proposed deviation from village standards or requirements must be clearly listed on the
preliminary plan application and fully justified as being both necessary to the proper
80
16
development of the property and consistent with the objectives set forth in the
applicable section of the village code.
VILLAGE BOARD RESPONSE: The development is not viable without exceeding the Village’s
40’ height maximum, which permitted as a special use. The height exceeding what is permitted
is setback and not visible at street level. Light supply impacts are similar to would occur with a 40’
structure.
(5) Design requirements. The planned unit development as a whole, as well as the
individual buildings and site improvements constructed as part of the planned unit
development, shall be in general conformity with the Kenilworth Design Guidelines—
Business District.
VILLAGE BOARD RESPONSE: The proposed building design is compatible with neighboring
buildings and is in keeping with the community’s character. The Applicant has added dimension
to the bulk, expanded building setbacks, and modified the roofline to conform with the Design
Guidelines.
(6) Compatibility of uses and design. The uses permitted in the planned unit
development shall be compatible with each other and with existing land uses in the
surrounding area. Uses shall be deemed compatible if all of the following criteria are
met.
(a) The individual uses in the planned unit development must be permitted uses
or permitted special uses in the B Business District, unless a use deviation is approved
by the Board of Trustees. Any individual use that is allowed only as a special use in the
B Business District must individually meet the standards for the granting of special use
permits, as established in § 153.245.
(b) The uses must be designed and located in conformity with the surrounding
development and adjacent properties.
VILLAGE BOARD RESPONSE: Above floor residential is a permitted use in the B -District. The
uses of the two first floor retail spaces will be evaluated against the special use standards once
occupants are identified.
(7) Covenants and restrictions to be enforceable by village. All covenants, deed
restrictions, easements and similar restrictions to be recorded in connection with the
planned unit development shall provide that they may not be modified, removed or
released without the express consent of the Board of Trustees and that they may be
enforced by the village as well as by future landowners within the proposed
development.
VILLAGE BOARD RESPONSE: The Ordinance may only be amended in line with the procedures
outlined in section 153.246 of the Kenilworth Village Code and shall be recorded with Cook County
upon its passage.
(8) Public open space and contributions. Whenever the village comprehensive plan
or official map indicates that development of a planned unit development will create a
need for land for public purposes of the village within the proposed planned unit
development, the Board of Trustees may require that the area be designated and to the
extent the need is specifically and uniquely attributable to the proposed development,
dedicated to the village for the use. In addition, the Board of Trustees may require
81
17
evidence that all requirements of village ordinances pertaining to the dedication of land
or the contribution of cash in connection with subdivisions or developments of land have
been met as respects the proposed planned unit development.
VILLAGE BOARD RESPONSE: Not applicable.
(9) Common open space.
(a) Amount, location and use. When common open space is provided in a
planned unit development, the amount and location of the open space shall be
consistent with its intended function as set forth in the application and planned unit
development plans. No open space shall be used for the construction of any structure or
improvement except the structures and improvements as may be approved in the final
plan as appropriate to the intended leisure and recreational uses for which the open
space is intended.
(b) Preservation. Adequate safeguards, including recorded covenants or
dedication of development rights, shall be provided to prevent the subsequent use of
common open space for any use, structure, improvement or development other than
that shown on the approved final plan. The restrictions must be permanent and not for a
given period of years and must run with the land.
(c) Ownership and maintenance. The final plan shall include provisions for the
ownership and maintenance of the open space and improvements as are reasonably
necessary to ensure their continuity, care, conservation, maintenance and operation in
accordance with predetermined standards and to ensure that remedial measures will be
available to the village if the open space or improvements are permitted to deteriorate or
are not maintained in a condition consistent with the best interests of the planned unit
development or the village.
VILLAGE BOARD RESPONSE: Not applicable.
(10) Property owners’ association. When the requirements of paragraph(C)(9)
above are to be satisfied by the ownership or maintenance of the open space or
improvements by a property owners’ association, the association shall meet each of the
following standards.
(a) The bylaws and rules of the association and all declarations, covenants and
restrictions to be recorded must be approved as part of the final plan prior to becoming
effective. Each document shall provide that it shall not be amended in any manner that
would result in it being in violation of the requirements of this subsection.
(b) The association must be established and all covenants and restrictions
recorded prior to the sale of any property within the area of the planned unit
development designated to have the exclusive use of the proposed open space or
improvements.
(c) The association must be responsible for casualty and liability insurance, taxes
and the maintenance of the open space and improvements to be deeded to it.
(d) Membership in the association must be mandatory for each property owner,
and any successive owner, having a right to the use or enjoyment of open space or
improvements.
(e) Every property having a right to the use or enjoyment of the open space or
improvements must pay its pro rata share of the cost of the association by means of an
82
18
assessment to be levied by the association that meets the requirements for becoming a
lien on the property in accordance with statutes of the state.
(f) The association must have the right to adjust the assessment to meet
changed needs. The membership vote required to authorize the adjustment shall not be
fixed at more than 51% of the members voting on the issue.
(g) The village must be given the right, but not the obligation, to enforce the
covenants.
(h) The village must be given the right, after ten days’ written notice to the
association, to perform any maintenance or repair work that the association has
neglected to perform, to assess the membership for the work and to have a lien against
the property of any member failing to pay the assessment. For this purpose alone, the
village shall have all the rights and powers of the association and its governing body
under the agreements and declarations creating the association.
VILLAGE BOARD RESPONSE: Not applicable.
(11) Landscaping and perimeter treatment. Any area of a planned unit
development not used for structures or circulation elements shall be landscaped or
otherwise improved. The perimeter of the planned unit development shall be treated so
as to ensure compatibility with surrounding uses by means such as provision of
compatible uses and structures; setbacks; screening; or natural or human-made buffers.
VILLAGE BOARD RESPONSE: Not applicable; building / impervious surface are proposed to be
lot line to lot line.
(12) Utilities. All utility lines shall be installed underground.
VILLAGE BOARD RESPONSE: Not applicable to preliminary PUD review.
(13) Traffic plan. The final plan for the planned unit development shall include a
traffic plan that identifies points of ingress and egress, streets, alleys and interior
circulation routes. The traffic plan shall be designed to minimize traffic congestion in the
public streets adjoining the planned unit development and to facilitate the free flow of
both vehicular and pedestrian traffic, within the planned unit development. The streets,
alleys and other traffic thoroughfares approved in planned unit development shall
comply with the minimum requirements of the village’s ordinances, rules and
regulations, unless a deviation is approved by the Board of Trustees.
VILLAGE BOARD RESPONSE: Final plan not yet submitted. To be reviewed upon submittal of
final plan.
(14) Range of uses. The planned unit development shall accommodate, as
appropriate, a mix of office/service, retail commercial, and residential land uses.
VILLAGE BOARD RESPONSE: Retail and residential space are proposed for the development.
(15) Enhancing community. The planned unit development shall promote a strong
community identity and opportunities to interact while building a healthy commercial tax
base.
83
19
VILLAGE BOARD RESPONSE: The mixed-use building meets the spirit of the Green Bay Road
Corridor Vision by enhancing the streetscape, adding vibrancy, creating luxury condominiums for
local families looking to downsize, and providing the potential for places to gather through two
new commercial space s. Occupied retail and residential spaces will bring in new sales and
property tax revenue. The building at 519 Park Drive has been long vacant and not generating
revenue.
(16) Public benefit. The planned unit development shall provide a substantial
benefit to the village and the public by maintaining the essential quality, viability and
attractiveness of village’s business district while encouraging new economic
development consistent with the character of the village.
VILLAGE BOARD RESPONSE: New development at this scale will create momentum to meet
the Village’s long -term goal of revitalizing the business district. The building character is
compatible with the community’s aesthetic and quality and brings owner-occupied condominiums
not currently available in Kenilworth. Owner-occupied units reduce turnover, which in turn reduces
the likelihood of nuisances that impact property values.
(D) Supplemental standards. The appropriateness and viability of a planned unit
development may also be evaluated by the Plan Commission and the Board of Trustees
based on the following supplemental criteria:
(1) Additional landscaping, buffering or screening within or around the perimeter of
the planned unit development;
VILLAGE BOARD RESPONSE: Building scale is minimized by evergreen landscaping
on the fourth floor allowing it to blend into the tree canopy. Landscaping will soften the
appearance of the residence planned for the fourth floor.
(2) Location and screening of parking facilities;
VILLAGE BOARD RESPONSE: Parking is fully enclosed within the first floor.
(3) Community amenities (such as, but not limited to, public art and gardens, public
transportation shelters);
VILLAGE BOARD RESPONSE: New retail commercial spaces create the opportunity for
desirable retail or service uses, such as a coffee shop or restaurant.
(4) Inclusion of sustainable design and green architecture;
VILLAGE BOARD RESPONSE: Green architecture elements were not included in the
proposal.
(5) Preservation of environmental features; and
VILLAGE BOARD RESPONSE: Not applicable.
(6) Preservation of historic features.
VILLAGE BOARD RESPONSE: No natural scenic or historic features will be impacted as
part of the development. While the architecture of 515 Park Drive is notable, it is not
specifically of historic merit. To account for the loss of the architectural features, several
elements from 515 Park Drive have been incorporated in the proposed building design,
such as large store fronts, natural stone, and slate mansard roof details.
84
20
Group Exhibit D
Plans
[attached]
85
01
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/3/2025
TITLE SHEET
515-519 PARK DRIVE KENILWORTH
SHEET INDEX
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
TITLE SHEET
PRELIMINARY SITE CONTEXT PLAN
EXISTING SITE PLAN
PRELIMINARY SITE PLAN
PRELIMINARY PLAT OF SURVEY + PRELIM. UTILITY PLAN
TURNING RADIUS EXHIBIT
PRELIMINARY CONSTRUCTION LOGISTICS PLAN
EXISTING NEIGHBOR BUILDINGS EXHIBIT
PRELIMINARY SCHEMATIC PLANS
PRELIMINARY SCHEMATIC LAYOUTS
PRELIMINARY SITE CONTEXT ELEVATIONS
PRELIMINARY ELEVATIONS
PRELIMINARY ELEVATIONS
DETAILED ELEVATIONS
DETAILED ELEVATIONS
ENLARGED DETAIL ELEVATION
PRELIMINARY SECTION
PRELIMINARY EXTERIOR VIEW - GREEN BAY RD
PRELIMINARY EXTERIOR VIEW - EARLSTON RD (DAY)
PRELIMINARY EXTERIOR VIEW - EARLSTON RD (NIGHT)
PRELIMINARY EXTERIOR VIEW - SE PARK AVE
PRELIMINARY EXTERIOR VIEW - SW PARK AVE
PRELIMINARY EXTERIOR VIEW - SW PENTHOUSE
PRELIMINARY EXTERIOR VIEW - SE PENTHOUSE
PRELIMINARY EXTERIOR VIEW - NW ALLEY
PRELIMINARY EXTERIOR VIEW - NE ALLEY
VIEW MAP
SITE VIEWS (PREVIOUS MODEL) SPRING, SUMMER, FALL
SITE VIEWS (PREVIOUS MODEL) SPRING, SUMMER, FALL
SITE VIEWS (PREVIOUS MODEL) SPRING, SUMMER, FALL
SITE VIEWS (PREVIOUS MODEL) SPRING, SUMMER, FALL
SITE VIEWS (PREVIOUS MODEL) SPRING, SUMMER, FALL
SITE VIEWS (UPDATED MODEL) WINTER)
SITE VIEWS (UPDATED MODEL) WINTER)
SITE VIEWS (UPDATED MODEL) WINTER)
PARK PLACE
515‐519 PARK DRIVE KENILWORTH, IL 60043
PUD APPLICATION REVISED ‐ 12/03/2025PROJECT DESCRIPTION
NEWLOOK DESIGN I BUILD + DEVELOPMENT, is proposing a new project at 515-519 PArk Drive in Kenilworth. The proposed development introduces a four-story, mixed-use
building designed to reinforce the architectural identity and walkability of Kenilworth’s business district. The project includes active ground-floor commercial uses and seven
residential units above, supported by 14 parking spaces in an enclosed interior garage. The planning approach prioritizes compatibility with the surrounding context while
contributing to the vibrancy of the block. Pitched roofs and traditional gabled forms reflect Kenilworth’s architectural vernacular, while activated storefronts are introduced in line with
the Green Bay Corridor's 2040 Vision. The massing steps back at the second floor in the middle portion, as well as at the fourth level to reduce perceived height and maintain a
pedestrian-friendly scale.
The development supports economic revitalization through flexible commercial spaces, increases residential density near transit and amenities, and eliminates visible surface
parking by fully enclosing stalls within the building. It also enhances the public realm with landscaping, sidewalk seating, and direct pedestrian access, offering a balanced approach
that blends traditional and modern design with functionality.
Throughout the PUD process we have welcomed the Village Commissioners and Neighbor feedback. The building has changed dramatically as a result of this feedback resulting in
a building that is better suited for its community which we welcome and appreciate.
We are very excited about this redevelopment and believe it will be a huge asset for The Village of Kenilworth. We are thankful for the City Staff who have helped get this project
through the planning process thus far.
PROJECT DETAILS
DISTRICT : B BUSINESS DISTRICT
-RESIDENTIAL ABOVE GRADE ONLY
MAXIMUM ROOF HEIGHT : 35' OR 3 1/2 STORIES
-DEFINED BY TOP OF STRUCTURE (ROOF PEAK) TO GRADE
MAXIMUM FOOTPRINT (COMBINED SITE AREA): 8,597 SQFT
TOTAL BLDG. AREA: 27,618 SQFT
SETBACKS: NONE - ZERO LOT LINE
TOTAL UNITS: 7 CONDO UNITS
RESIDENTIAL PARKING: 2 CARS FOR EVERY UNIT
-2.0 PARKING TO UNIT RATIO
COMMERCIAL PARKING: NONE
PROPOSED VIEW FROM PARK DRIVE
PROJECT TEAM
DESIGN I BUILD TEAM
NEWLOOK DESIGN I BUILD + DEVELOPMENT
907 RIDGE RD. WILMETTE, IL 606 91 224.408.2280
MANAGING PRINCIPAL:
MICHAEL FREIBURGER 847.682.8810
michael@newlookdevelopment.com
ARCHITECT OF RECORD:
STEVE ECONOMOU
steve@newlookdevelopment.com
CIVIL ENGINEER
BONO CONSULTING
1018 BUSSE HIGHWAY, PARK RIDGE, IL 60068
MANAGING PRINCIPAL:
BERNIE BONO
bbono@bonoconsulting.com
847.823.3300
OWNER:
RED3 DEVELOPMENT
OWNER
MICHAEL FREIBURGER
michael@newlookdevelopment.com
86
02
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/3/2025
PRELIMINARY SITE CONTEXT PLAN
515-519 PARK DRIVE KENILWORTH
515-519 PARK DRIVE
PARK DRIVE
GREEN BAY RD
87
03
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/3/2025
EXISTING SITE PLAN
515-519 PARK DRIVE KENILWORTH
P.P.
P.P.
P.P.
P.P.
P.P.
519 515
88
04
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/3/2025
PRELIMINARY SITE PLAN
515-519 PARK DRIVE KENILWORTH
DOWN
DOWN R G
PARK DRIVE
GREEN BAY RD.
BD
BD
BD BD
BD
BD
BD
BD
BD
R-4 R-4 R-4
R-4
R-4R-4 R-4
89
05
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/3/2025
PRELIMINARY PLAT OF SURVEY + PRELIM. UTILITY PLAN
515-519 PARK DRIVE KENILWORTH
UP
UP
1 2 3 4 5 6 7 8 9
1 2 3 4 5
1,535 sqft 916 sqft
1,353 sqft
4,993 sqft
COMMON
RETAIL RETAIL
PARKING
PRELIMINARY UTILITY CONNECTION PLAN
PROPOSED ELECTRICAL METERS
PROPOSED WATER SERVICE +
FIRE PROTECTION AREA
ABANDON EXISTING
SEWER AND WATER
SERVICE
PROPOSED 3"
WATER SERVICE
PROPERTY LINEPROPERTY LINE
PROPERTY LINE
EXISTING 12"
WATER MAIN
NEW 8" WATER LINE
FOR FIRE PROTECTION
NEW 3" DOMESTIC
WATER LINE
IN GROUND WATER
METER VALVE VAULT.
NEW
10" STORM
LINE
NEW
8" SANITARY FRONT BLDG.
EXISTING 10" SANITARY LIINE
519 515
90
06
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/3/2025
TURNING RADIUS EXHIBIT
515-519 PARK DRIVE KENILWORTH
UP
UP
1 2 3 4 5 6 7 8 9
1 2 3 4 5
1,535 sqft 916 sqft
1,353 sqft
43.7 FT
47.5 FT
43.7 FT
47.5 FT
4,993 sqft
COMMON
RETAIL RETAIL
PARKING
<Custom Text>
9'-0" by 9'-4"
1
2
3
4
5
6
7
8
9
1012
13
14
15
16
17
18
19
20
21 UP
1
2
3
4
5
6
7
8
9
10 12
13
14
15
16
17
18
19
20
21
UP
<Custom Text>
13'-2 55/64" by 9'-4"
<Custom Text>
13'-1 61/64" by 9'-4"
<Custom Text>
9'-2 1/2" by 10'-0"10'-7 23/32"
<Custom Text>
5'-4" by 7'-0"
<Custom Text>
5'-4" by 2'-0"
<Custom Text><Custom Text>
by 7'-0"
<Custom Text>
1'-7 1/2" by 7'-0" 1'-7 1/2" by 7'-0"
<Custom Text>
9'-5 1/2" by 7'-0"
<Custom Text>
1'-7 1/2" by 7'-0"
<Custom Text>
1'-7 1/2" by 7'-0"
<Custom Text>
1'-7 1/2" by 2'-0"
<Custom Text>
4'-0" by 4'-0"
<Custom Text>
4'-0" by 4'-0" <Custom Text>
4'-0" by 4'-0"
1 2 3 4 5 6 7 8 9
1 2 3 4 5
1,535 sqft 916 sqft
1,353 sqft
19.7 FT
16.9 FT
4,993 sqft
16.9 FT18.7 FT
<Custom Text>
9'-0" by 9'-4"
1
2
3
4
5
6
7
8
9
1012
13
14
15
16
17
18
19
20
21 UP
1
2
3
4
5
6
7
8
9
10 12
13
14
15
16
17
18
19
20
21
UP
<Custom Text>
13'-2 55/64" by 9'-4"
<Custom Text>
13'-1 61/64" by 9'-4"
<Custom Text>
9'-2 1/2" by 10'-0"
<Custom
Text>
10'-7 23/32"
<Custom Text>
5'-4" by 7'-0"
<Custom Text>
5'-4" by 2'-0"
<Custom Text><Custom Text>
by 7'-0"
<Custom Text>
1'-7 1/2" by 7'-0"
<Custom Text>
1'-7 1/2" by 7'-0"
<Custom Text>
9'-5 1/2" by 7'-0"
<Custom Text>
1'-7 1/2" by 7'-0"
<Custom Text>
1'-7 1/2" by 7'-0"
<Custom Text>
1'-7 1/2" by 2'-0"
<Custom Text>
4'-0" by 4'-0"
<Custom Text>
4'-0" by 4'-0" <Custom Text>
4'-0" by 4'-0"
1 2 3 4 5 6 7 8 9
1 2 3 4 5
1,535 sqft 916 sqft
1,353 sqft
23.1 FT
25.9 FT
23.1 FT
23.1 FT
4,993 sqft
19.0 ft
TRUCK RADIUS EXHIBIT CAR RADIUS EXHIBIT PICKUP RADIUS EXHIBIT
20.3' TRUCK TURNING RADIUS
91
07
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/3/2025
PRELIMINARY CONSTRUCTION LOGISTICS PLAN
515-519 PARK DRIVE KENILWORTH
UP
UP
1 2 3 4 5 6 7 8 9
1 2 3 4 5
1,535 sqft 916 sqft
1,353 sqft
4,993 sqft
COMMON
RETAIL RETAIL
PARKING
PHASE 1 - DEMO PHASE 2 - CONSTRUCTION
PROPERTY LINEPROPERTY LINE
PHASE 1
STAGING ZONE
EXISTING 10" SANITARY LIINE
PHASE 2
STAGING ZONE
SECONDARY/EMERGENCY SITE
ACCESS GATE
SHORT TERM
DELIVERIES
CONSTRUCTION FENCE
CONSTRUCTION FENCE
MAIN SITE ACCESS GATE
FULLY RENDERED CONSTRUCITON
FENCE SIGNAGE-LOTLINE TO LOTLINE
TREE
PROTECTION
TREE
PROTECTION
GENERAL NOTES:
SIDEWALK TO FULLY CLOSE DURING CONSTRUCTION WITH PEDESTRIAN DETOUR SIGNAGE PROVIDED
REQUEST VILLAGE PERMISSION TO TAKE (3) PARKING SPACES IN FRONT OF PROJECT.
REQUEST VILLAGE PERMISSION TO UTILIZE 70'X25' PORTION OF PARKWAY FOR CONSTRUCTION STAGING.
PARKING MITIGATION PLAN:
ALL CONSTRUCITON VEHICLES TO PARK ON VILLAGE OF KENILWORTH PROPERTY AND GREEN BAY ROAD. NO
CONSTRUCTION PARKING TO OCCUR ON EAST/WEST RESIDENTIAL STREETS.
SIDEWALK AND CURB TO
RESTORED AFTER
CONSTRUCTION
PEDESTRIAN BARRICADE IN
STREET 4' WIDTH
RESTORE PARKWAY AFTER AFTER
CONSTRUCTION
6' CONSTRUCTION FENCE
AROUND STAGING AREA
519 515
70'
CONSTRUCTION
STAGE AREA 25'
92
08
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/3/2025
EXISTING NEIGHBOR BUILDINGS EXHIBIT
515-519 PARK DRIVE KENILWORTH
EXISTING BUILDING AT 515 PARK DRIVE
EXISTING GARAGE AT 525 PARK DRIVE
GARAGE SET BACK - 4'-0" TO MATCH EXISTING
NEIGHBORING GARAGES
EXISTING GARAGE AT 525 PARK DRIVE
BUILDING AT 521 PARK DRIVE
BUILDING AT 521 PARK DRIVE
93
09
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/3/2025
PRELIMINARY SCHEMATIC PLANS
515-519 PARK DRIVE KENILWORTH
UP
UP
1 2 3 4 5 6 7 8 9
1 2 3 4 5
1,535 sqft 916 sqft
1,353 sqft
4,993 sqft
COMMON
RETAIL RETAIL
PARKING
DOWN
DOWN
320 sq ft
370 sq ft
333 sq ft
561 sq ft
COMMON
PENTHOUSE
3,424
2 5 . 7
2 5 . 6
DOWN
DOWN
2,527 sqft
521 sqft
2,101 sqft2,419 sqft
236 sqft 315 sqft
315 sqft
COMMON
UNIT 3UNIT 2
UNIT 1
SQUARE FOOTAGE
FLOOR
First Floor
Second Floor
Third Floor
Penthouse
Zone Name
COMMON
PARKING
RETAIL
RETAIL
COMMON
UNIT 1
UNIT 2
UNIT 3
COMMON
UNIT 1
UNIT 2
UNIT 3
COMMON
PENTHOUSE
AREA
1,353
4,993
916
1,535
521
2,527
2,419
2,101
521
2,527
2,419
2,101
261
3,424
27,618 ft²
FIRST FLOOR PLAN PENTHOUSE AND ROOFTOP PLAN SECOND AND THIRD FLOOR PLAN
6+1 UNITS
14 STALLS
2.0 PARKING TO UNIT RATIO
PROFORMA TOTALS
RETAIL = 2,451 sqft
FOR SALE = 17,529 sqft
COMMON = 2,656 sqft
PARKING = 4,993 sqft
RETAIL+FORSALE=19,980 SQFT
TOTAL BLDG = 27,6 18 sqft
EFFICIENCY = 72.3%
EFFICIENCY (NIC PARKING) = 88.3%*EFFICIENCY CALCULATIONS INCLUDE RETAIL +
RENTABLE
SITE DATA:
519 PARK DRIVE:
6250 SQFT
0.14 ACRES
515 PARK DRIVE:
2347 SQFT
0.05 ACRES
COMBINED
8,597 SQFT
0.19 ACRES
BUILDING DATA:
94
10
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/3/2025
PRELIMINARY SCHEMATIC LAYOUTS
515-519 PARK DRIVE KENILWORTH
UP
UP
1 2 3 4 5 6 7 8 9
1 2 3 4 5
1,535 sqft 916 sqft
1,353 sqft
4,993 sqft
RETAIL
RETAIL
RETAIL
STORAGE
COUNTER
KICHENETTE
EMPLOYEES
BATHRM.
STORAGE
ORDER
COUNTER
RETAIL
TRASH MEP
MEP
HVAC
EP
TRASH
COUNTER
RESIDENCE
VESTIBULE
ELEVATOR
LOBBY
COMMON
RETAIL RETAIL
PARKING
2 7 . 7
1 0 . 2
1 6 . 5
1 2 . 2
3 . 1
1 8 . 1
3 2 . 7
8 . 5
5 . 9
1 2 . 4
2 3 . 7
1 3 . 6
1 1 . 0 1 4 . 81 3 . 4
4 . 5
8 . 8
5 . 8
DOWN
DOWN
320 sq ft
370 sq ft
333 sq ft
561 sq ft
STRG.
6'-2" X 17'-9"
BR 4
12'-10" X 10'-3"
DINING
12'-4" X
15'-9"
LIVING
20'-9" X 17'
LAUNDRY
8'-2" X 11'-3"
POWDER
11'-3" X 5'-8"
PRIMARY
13'-7" X 18'-9"
PRIMARY BATH
18'-9" X 7'-10"
WIC
13'-10" X 8'-7"
MUDROOM
5' X 19'
PANTRY
10'-10" X
5'-9"
COMMONRG
KITCHEN
20'-9" X 14'-5"
SECONDARY
12'-4" X 14'-5"
PREP
KITCHEN
5'-10" X
5'-9"
PATIO
FLEX / MEDIA
10' X 13'-4"
BR 3
12' X 12'
PATIO
PATIO
MECHANICAL
PENTHOUSE
3,424
2 5 . 7
4 . 7
1 3 . 8
1 3 . 4
2 7 . 0
1 6 . 9
2 1 . 6
2 2 . 2
1 7 . 9
1 9 . 5
3 0 . 81 8 . 6
9 . 4
2 . 4
5 . 4
1 3 . 0
5 . 6
2 5 . 6
2 2 . 5
1 3 . 4
1 6 . 7
4 . 5
1 5 . 2 7 . 6
2 4 . 9
1 4 . 1
4 . 5
2 . 2
1 3 . 4
1 8 . 7
3 . 1
3 . 4
1 3 . 41 3 . 4
6 . 8
4 . 5
4 . 9
1 1 . 6
1 1 . 1
9 . 6
1 4 . 4
1 4 . 5
4 . 5
4 . 0
3 . 1
1 . 6
DOWN
DOWN
OUTDOOR
20' X 13'-10"
277 SQFT
2,527 sqft
521 sqft
2,101 sqft
DINING
11'-1" X
16'-5"
LIVING
15'-4" X 15'-2"
PRIMARY
15' X 16'
BATH
10'-2" X
4'-11"
LIVING
21'-3" X
15'-8"
CLOSET
18'-9" X 5'-5"
MDRM.
8'-2" X 7'-1"
OFFICE /
DEN
13'-2" X
10'-7"
OUTDOOR
20' X 10'-6"
210 SQFT
MDRM.
7'-8" X
7'-10"
PRIMARY
17'-5" X 13'-11"
BATH
9'-8" X 5'
PRIMARY BATH
12'-7" X 13'-1"
WIC
8'-6" X 9'-7"
LIVING
17'-11" X 15'
DINING
8'-5" X 18'
MECH
3'-11" X 6'-1"
DINING
8'-8" X
13'-10"
WIC
10'-9" X 9'-7"
PRIMARY BATH
10'-7" X 14'-9"
MECH
5'-5" X 6'-3"
MECH
4' X 4'-5"
2,419 sqft
236 sqft 315 sqft
315 sqft
COMMON
UNIT 3UNIT 2
RG
RG
RG
SECONDARY
12' X 12'-5"
SECONDARY
12' X 12'
KITCHEN
20'-7" X 14'-1"
PRIMARY
16'-1" X 12'
KITCHEN
10' X 20'
BR3
12' X 12'
KITCHEN
10' X 18'
LAUNDRY
6'-5" X 7'-7"
BR2
12' X 12'
OFFICE
/ DEN
11'-2" X
18'
OUTDOOR
20' X
13'-10"
276 SQFT
MUDD ROOM
5'-2" X 6'-5"
POWDER
5'-7" X 6'-5"
BR2
12' X 12'
BR3
12' X 12'
LAUNDRY
5'-1" X 10'-5"
OFFICE /
DEN
11'-2" X 18'
LAUNDRY
6'-5" X 7'-7"
POWDER
6'-1" X 7'-2"
UNIT 1
SQUARE FOOTAGE
FLOOR
First Floor
Second Floor
Third Floor
Penthouse
Zone Name
COMMON
PARKING
RETAIL
RETAIL
COMMON
UNIT 1
UNIT 2
UNIT 3
COMMON
UNIT 1
UNIT 2
UNIT 3
COMMON
PENTHOUSE
AREA
1,353
4,993
916
1,535
521
2,527
2,419
2,101
521
2,527
2,419
2,101
261
3,424
27,618 ft²
FIRST FLOOR PLAN PENTHOUSE AND ROOFTOP PLAN SECOND AND THIRD FLOOR PLAN
6+1 UNITS
14 STALLS
2.0 PARKING TO UNIT RATIO
PROFORMA TOTALS
RETAIL = 2,451 sqft
FOR SALE = 17,529 sqft
COMMON = 2,656 sqft
PARKING = 4,993 sqft
RETAIL+FORSALE=19,980 SQFT
TOTAL BLDG = 27,6 18 sqft
EFFICIENCY = 72.3%
EFFICIENCY (NIC PARKING) = 88.3%*EFFICIENCY CALCULATIONS INCLUDE RETAIL +
RENTABLE
SITE DATA:
519 PARK DRIVE:
6250 SQFT
0.14 ACRES
515 PARK DRIVE:
2347 SQFT
0.05 ACRES
COMBINED
8,597 SQFT
0.19 ACRES
BUILDING DATA:
95
11
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/3/2025
PRELIMINARY SITE CONTEXT ELEVATIONS
515-519 PARK DRIVE KENILWORTH
±0"
1 First Floor
+12'-8 1/2"
2 Second Floor
+23'-11"
3 Third Floor
+35'-1 1/2"
4 Penthouse
+46'-4"
5 Roof
22'-0"
13'-5"
27'-0"
38'-3"
PARAPET HEIGHT
46'-4"
HEIGHT
±0"
1 First Floor
+12'-8 1/2"
2 Second Floor
+23'-11"
3 Third Floor
+35'-1 1/2"
4 Penthouse
+46'-4"
5 Roof
35'-0"
South Context Elevation
BUILDING AT PARK
DRIVE AN GREEN BAY
ROAD
PROPOSED
DEVELOPMENT AT
515-519
523 513 511
96
12
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/3/2025
PRELIMINARY ELEVATIONS
515-519 PARK DRIVE KENILWORTH
±0"
1 First Floor
+12'-8 1/2"
2 Second Floor
+23'-11"
3 Third Floor
+35'-1 1/2"
4 Penthouse
+46'-4"
5 Roof 38'-3"
PARAPET HEIGHT
46'-4"
HEIGHT
4
3
2
1
5
8
7
±0"
1 First Floor
+12'-8 1/2"
2 Second Floor
+23'-11"
3 Third Floor
+35'-1 1/2"
4 Penthouse
+46'-4"
5 Roof
4
3
2
1
5
6
7
SOUTH ELEVATION
EAST ELEVATION EXTERIOR KEYNOTE LEGEND
1 - JAMES HARDIE - COMPOSITE PANEL & TRIM- AGED PEWTER OR
COLOR CUSTOM WARM GRAYISH BROWN
2 - 3/4" CEMENTICIOUS STUCCO - COLOR BUFF
3 - 3/4" CEMENTICIOUS STUCCO - COLOR: WARM GRAYISH BROWN
(SIMILAR TO GRAY HARDIE)
4 - STONECRAFT - MANUFACTURED INDIANA LIMESTONE - COLOR
BUFF
5 - DAVINCI ROOFSCAPES - COMPOSITE SLATE ROOF - COLOR
CASTLE GRAY
6 - COUNTY MATERIALS - HERRITAGE COLLECTION - LARGE FORMAT
BRICK - TEXTURE: SMOOTH, COLOR: PEBBLE BEACH OR SIMILAR
7 - WINDOW - WOOD CLAD / ALUMINUM CASEMENT - MARVIN OR
EQUAL W/ TRANSOM & SDL'S
8 - ALUMINUM COMMERCIAL STOREFRONT SYSTEM
97
13
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/3/2025
PRELIMINARY ELEVATIONS
515-519 PARK DRIVE KENILWORTH
±0"
1 First Floor
+12'-8 1/2"
2 Second Floor
+23'-11"
3 Third Floor
+35'-1 1/2"
4 Penthouse
+46'-4"
5 Roof
4
3
2
1
5
6
7
±0"
1 First Floor
±0"
1 First Floor
+12'-8 1/2"
2 Second Floor
+12'-8 1/2"
2 Second Floor
+23'-11"
3 Third Floor
+23'-11"
3 Third Floor
+35'-1 1/2"
4 Penthouse
+35'-1 1/2"
4 Penthouse
+46'-4"
5 Roof
+46'-4"
5 Roof
3
2
1
5
6
7
NORTH ELEVATION
WEST ELEVATION
EXTERIOR KEYNOTE LEGEND
1 - JAMES HARDIE - COMPOSITE PANEL & TRIM- AGED PEWTER OR
COLOR CUSTOM WARM GRAYISH BROWN
2 - 3/4" CEMENTICIOUS STUCCO - COLOR BUFF
3 - 3/4" CEMENTICIOUS STUCCO - COLOR: WARM GRAYISH BROWN
(SIMILAR TO GRAY HARDIE)
4 - STONECRAFT - MANUFACTURED INDIANA LIMESTONE - COLOR
BUFF
5 - DAVINCI ROOFSCAPES - COMPOSITE SLATE ROOF - COLOR
CASTLE GRAY
6 - COUNTY MATERIALS - HERRITAGE COLLECTION - LARGE FORMAT
BRICK - TEXTURE: SMOOTH, COLOR: PEBBLE BEACH OR SIMILAR
7 - WINDOW - WOOD CLAD / ALUMINUM CASEMENT - MARVIN OR
EQUAL W/ TRANSOM & SDL'S
8 - ALUMINUM COMMERCIAL STOREFRONT SYSTEM
98
14
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/3/2025
DETAILED ELEVATIONS
515-519 PARK DRIVE KENILWORTH
326 sq ft
813 sq ft
103 sq ft 103 sq ft
90 sq ft
229 sq ft
43 sq ft
202 sq ft
36 sq ft
24 sq ft 36 sq ft 36 sq ft
36 sq ft 36 sq ft 23 sq ft
23 sq ft
23 sq ft
24 sq ft
36 sq ft
24 sq ft
89 sq ft 155 sq ft 154 sq ft90 sq ft
70 sq ft 54 sq ft 68 sq ft
90 sq ft
38'-3"
PARAPET HEIGHT
46'-4"
HEIGHT
43 sq ft
194 sq ft
178 sq ft 154 sq ft
173 sq ft
92 sq ft
36 sq ft
42 sq ft
244 sq ft
731 sq ft
474 sq ft
279 sq ft
24 sq ft 36 sq ft
32 sq ft 32 sq ft 32 sq ft
24 sq ft
64 sq ft 21 sq ft 38 sq ft
318 sq ft
1,644 sq ft
126 sq ft
21 sq ft 21 sq ft 21 sq ft 21 sq ft 21 sq ft
60 sq ft
36 sq ft
32 sq ft 32 sq ft 32 sq ft
86 sq ft
204 sq ft
SOUTH ELEVATION WEST ELEVATION
SOUTH ELEVATION SURFACE CALCULATION
17% - JAMES HARDIE - COMPOSITE PANEL & TRIM- AGED PEWTER OR
COLOR CUSTOM WARM GRAYISH BROWN - 528 SF
6.5% - 3/4" CEMENTICIOUS STUCCO - COLOR BUFF - 206 SF
5.5% - 3/4" CEMENTICIOUS STUCCO - COLOR: WARM GRAYISH BROWN
(SIMILAR TO GRAY HARDIE) - 180 SF
27% - STONECRAFT - MANUFACTURED INDIANA LIMESTONE - COLOR
BUFF - 846 SF
10% - DAVINCI ROOFSCAPES - COMPOSITE SLATE ROOF - - COLOR
CASTLE GRAY - 315 SF
0% - COUNTY MATERIALS - HERRITAGE COLLECTION - LARGE FORMAT
BRICK - TEXTURE: SMOOTH, COLOR: PEBBLE BEACH OR SIMILAR
34% GLAZING / OPENINGS - 1037 SF
WEST ELEVATION SURFACE CALCULATION
21.5% - JAMES HARDIE - COMPOSITE PANEL & TRIM- AGED PEWTER OR
COLOR CUSTOM WARM GRAYISH BROWN - 1205 SF
10.5% - 3/4" CEMENTICIOUS STUCCO - COLOR BUFF - 575 SF
3% - 3/4" CEMENTICIOUS STUCCO - COLOR: WARM GRAYISH BROWN
(SIMILAR TO GRAY HARDIE) - 178 SF
2% - STONECRAFT - MANUFACTURED INDIANA LIMESTONE - COLOR
BUFF - 126 SF
10.5% - DAVINCI ROOFSCAPES - COMPOSITE SLATE ROOF - - COLOR
CASTLE GRAY - 585 SF
29.5% - COUNTY MATERIALS - HERRITAGE COLLECTION - LARGE
FORMAT BRICK - TEXTURE: SMOOTH, COLOR: PEBBLE BEACH OR
SIMILAR - 1644 SF
23% GLAZING / OPENINGS - 1275 SF
99
15
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/3/2025
DETAILED ELEVATIONS
515-519 PARK DRIVE KENILWORTH
91 sq ft
48 sq ft 190 sq ft 59 sq ft
36 sq ft 36 sq ft 36 sq ft
24 sq ft 36 sq ft 36 sq ft
36 sq ft
16 sq ft
134 sq ft
24 sq ft
195 sq ft
28 sq ft
17 sq ft
21 sq ft 21 sq ft 70 sq ft 70 sq ft
785 sq ft
360 sq ft
88 sq ft
190 sq ft24 sq ft
658 sq ft
366 sq ft91 sq ft 94 sq ft
302 sq ft
193 sq ft
408 sq ft
24 sq ft
16 sq ft
36 sq ft36 sq ft 36 sq ft
36 sq ft 36 sq ft 36 sq ft36 sq ft
35 sq ft 35 sq ft
24 sq ft 24 sq ft194 sq ft
24 sq ft
249 sq ft41 sq ft 193 sq ft
1,219 sq ft
21 sq ft 21 sq ft 21 sq ft 21 sq ft
36 sq ft
407 sq ft
89 sq ft
95 sq ft
154 sq ft
36 sq ft
24 sq ft 36 sq ft
16 sq ft
28 sq ft
49 sq ft
NORTH ELEVATION EAST ELEVATION NORTH-EAST ELEVATION
EAST ELEVATION SURFACE CALCULATIONNORTH ELEVATION SURFACE CALCULATION NORTH-EAST
0%
16% - 154 SF
9% - 89 SF
0%
14.5% - 144 SF
42% - 407 SF
18.5% - 176 SF
8% - JAMES HARDIE - COMPOSITE PANEL & TRIM- AGED PEWTER OR
COLOR CUSTOM WARM GRAYISH BROWN - 195 SF
14.5% - 3/4" CEMENTICIOUS STUCCO - COLOR BUFF - 360 SF
7.5% - 3/4" CEMENTICIOUS STUCCO - COLOR: WARM GRAYISH BROWN
(SIMILAR TO GRAY HARDIE) - 179 SF
0% - STONECRAFT - MANUFACTURED INDIANA LIMESTONE - COLOR
BUFF
12% - DAVINCI ROOFSCAPES - COMPOSITE SLATE ROOF - - COLOR
CASTLE GRAY - 297 SF
32% - COUNTY MATERIALS - HERRITAGE COLLECTION - LARGE FORMAT
BRICK - TEXTURE: SMOOTH, COLOR: PEBBLE BEACH OR SIMILAR - 785
SF
26% GLAZING / OPENINGS - 641 SF
22.5% - JAMES HARDIE - COMPOSITE PANEL & TRIM- AGED PEWTER OR
COLOR CUSTOM WARM GRAYISH BROWN - 1066 SF
10.5% - 3/4" CEMENTICIOUS STUCCO - COLOR BUFF - 495 SF
4% - 3/4" CEMENTICIOUS STUCCO - COLOR: WARM GRAYISH BROWN
(SIMILAR TO GRAY HARDIE) - 185 SF
7.5% - STONECRAFT - MANUFACTURED INDIANA LIMESTONE - COLOR
BUFF - 366 SF
10% - DAVINCI ROOFSCAPES - COMPOSITE SLATE ROOF - - COLOR
CASTLE GRAY - 483 SF
26% - COUNTY MATERIALS - HERRITAGE COLLECTION - LARGE FORMAT
BRICK - TEXTURE: SMOOTH, COLOR: PEBBLE BEACH OR SIMILAR - 1219
SF
19.5% GLAZING / OPENINGS - 926 SF
100
16
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/3/2025
ENLARGED DETAIL ELEVATION
515-519 PARK DRIVE KENILWORTH
DAVINCI ROOFSCAPES - COMPOSITE SLATE ROOF - COLOR: CASTLE GRAY
3/4" CEMENTICIOUS STUCCO - COLOR: WARM GRAYISH
BROWN (SIMILAR TO GRAY HARDIE)
WINDOW - WOOD CLAD / ALUMINUM CASEMENT - MARVIN OR EQUAL W/
TRANSOM & SDL'S
3/4" CEMENTICIOUS STUCCO - WHITE
STONECRAFT - MANUFACTURED INDIANA LIMESTONE - COLOR: BUFF
JAMES HARDIE - COMPOSITE PANEL & TRIM - AGED PEWTER OR SIMILAR
CUSTOM WARM GRAYISH BROWN
STONECRAFT - MANUFACTURED INDIANA LIMESTONE - MANUFACTURED
CORNICE - COLOR BUFF
STEEL AWNING - COLOR BLACK
FABRIC WINDOW AWNING - COLOR BLACK
DOWNSPOUTS WITH DECORATIVE SCUPPER - COLOR BLACK
101
17
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/3/2025
PRELIMINARY SECTION
515-519 PARK DRIVE KENILWORTH
38'-3"
TO PARAPET
46'-4"
ROOF HEIGHT
11'-0"
1'-8 1/2"
9'-6"
1'-8 1/2"
9'-6"
1'-8 1/2"
COMMERCIAL
UNIT 201
UNIT 301
PENTHOUSE
13'-5 1/8"
TO 513 PARK DRIVE
22'-0"
TO 511 PARK DRIVE
38'-3"
TO PARAPET
46'-4"
ROOF HEIGHT
0"
27'-0"
523 PARK DRIVE
35'-0"
TYPICAL HEIGHT
11'-0"
1'-8 1/2"
9'-6"
1'-8 1/2"
9'-6"
1'-8 1/2"
COMMERCIAL
UNIT 201
UNIT 301
PENTHOUSE
E/W SECTION - CORE
N/S SECTION - PARK DRIVE
102
18
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/3/2025
PRELIMINARY EXTERIOR VIEW - GREEN BAY RD
515-519 PARK DRIVE KENILWORTH
103
19
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/3/2025
PRELIMINARY EXTERIOR VIEW - EARLSTON RD (DAY)
515-519 PARK DRIVE KENILWORTH
104
20
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/3/2025
PRELIMINARY EXTERIOR VIEW - EARLSTON RD (NIGHT)
515-519 PARK DRIVE KENILWORTH
105
21
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/3/2025
PRELIMINARY EXTERIOR VIEW - SE PARK AVE
515-519 PARK DRIVE KENILWORTH
106
22
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/3/2025
PRELIMINARY EXTERIOR VIEW - SW PARK AVE
515-519 PARK DRIVE KENILWORTH
107
23
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/3/2025
PRELIMINARY EXTERIOR VIEW - SW PENTHOUSE
515-519 PARK DRIVE KENILWORTH
108
24
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/3/2025
PRELIMINARY EXTERIOR VIEW - SE PENTHOUSE
515-519 PARK DRIVE KENILWORTH
109
25
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/3/2025
PRELIMINARY EXTERIOR VIEW - NW ALLEY
515-519 PARK DRIVE KENILWORTH
110
26
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/3/2025
PRELIMINARY EXTERIOR VIEW - NE ALLEY
515-519 PARK DRIVE KENILWORTH
111
27
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/3/2025
VIEW MAP
515-519 PARK DRIVE KENILWORTH
515-519 PARK DRIVE
PARK DRIVE
GREEN BAY RD
4
8
7
6
3
10
12
1
5
2
11
9
16 Earlston Rd and Stearling Rd
15 Park
drive and
Brier
13 14 Briar and
Melrose
17
18
19
112
28
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/3/2025
SITE VIEWS (PREVIOUS MODEL) SPRING, SUMMER, FALL
515-519 PARK DRIVE KENILWORTH
1 2
3 4
113
29
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/3/2025
SITE VIEWS (PREVIOUS MODEL) SPRING, SUMMER, FALL
515-519 PARK DRIVE KENILWORTH
5 6
7 8
114
30
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/3/2025
SITE VIEWS (PREVIOUS MODEL) SPRING, SUMMER, FALL
515-519 PARK DRIVE KENILWORTH
9 10
11 12
115
31
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/3/2025
SITE VIEWS (PREVIOUS MODEL) SPRING, SUMMER, FALL
515-519 PARK DRIVE KENILWORTH
13 15
16 17
116
32
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/3/2025
SITE VIEWS (PREVIOUS MODEL) SPRING, SUMMER, FALL
515-519 PARK DRIVE KENILWORTH
18 19
117
33
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/3/2025
SITE VIEWS (UPDATED MODEL) WINTER)
515-519 PARK DRIVE KENILWORTH
1 2
3 4
118
34
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/3/2025
SITE VIEWS (UPDATED MODEL) WINTER)
515-519 PARK DRIVE KENILWORTH
5 6
7 8
119
35
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/3/2025
SITE VIEWS (UPDATED MODEL) WINTER)
515-519 PARK DRIVE KENILWORTH
9 10
11
120
36
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/4/2025
MASS REDUCTION EXHIBIT
515-519 PARK DRIVE KENILWORTH
ARC 1 ARC 2 PC
12/1/2025
121
37
907 ridge Road
Wilmette, IL 60091
o: 224.408.2280
12/4/2025
PERCEIVED PERSPECTIVE RELIEF REQUEST
515-519 PARK DRIVE KENILWORTH
122
21
Exhibit E
Unconditional Agreement and Consent
TO: The Village of Kenilworth, Illinois ("Village"):
WHEREAS, RED3 Development, LLC (“Applicant”), is the contract purchaser of that
certain property commonly known as 515 Park Drive and 519 Park Drive in Kenilworth, Illinois
(“Property”); and
WHEREAS, Ordinance No. ___________, adopted by the Village President and Board of
Trustees on October _____, 202 6 ("Ordinance"), grants approval of a certificate of
appropriateness, and a preliminary planned unit development special use permit for the Property;
and
WHEREAS, Section 10 of the Ordinance provides, among other things, that the Ordinance
will be of no force or effect unless and until the Applicant files, within 90 days following the
passage of the Ordinance, its unconditional agreement and consent to accept and abide by each
and all of the terms, conditions, and limitations set forth in the Ordinance;
NOW, THEREFORE, the Applicant does hereby agree and covenant as follows:
1. The Applicant hereby unconditionally agrees to, accepts, consents to, and will
abide by, each and all of the terms, conditions, limitations, restrictions, and provisions of the
Ordinance.
2. The Applicant acknowledges that public notices and hearings have been properly
given and held with respect to the adoption of the Ordinance, has considered the possibility of the
revocation provided for in the Ordinance, and agrees not to challenge any such revocation on the
grounds of any procedural infirmity or a denial of any procedural right.
3. The Applicant acknowledges and agrees that the Village is not and will not be, in
any way, liable for any damages or injuries that may be sustained as a result of the Village's
granting of special use permits for the Property or its adoption of the Ordinan ce, and that the
Village's approvals do not, and will not, in any way, be deemed to insure the Applicant against
damage or injury of any kind and at any time.
4. The Applicant does hereby agree to hold harmless and indemnify the Village, the
Village's corporate authorities, and all Village elected and appointed officials, officers, employees,
agents, representatives, and attorneys, from any and all claims that may, at any time, be asserted
against any of such parties in connection with the Village's adoption of the Ordinance granting the
special use permits for the Property.
RED3 DEVELOPMENT, LLC,
By: ______________________________
Name: Michael Freiburger
SUBSCRIBED and SWORN to before me this _______ day of ___________________, 2026.
____________________________________
Notary Public
123
Architectural Review Commission Findings of Fact
Meeting Summary
The Architectural Review Commission met on October 15, 2025 and October 28, 2025 to review the
application for a Certificate of Appropriateness (COA) in connection with a Planned Unit
Development (PUD) request for 515-519 Park Drive.
At the October 15th meeting the Commission’s discussion focused on several elements, including the
massing of the building in relationship with the neighboring properties, roof design, color of the
building materials, garage access, and the visibility of the 4th floor trelli s from the public way . In
addition, members of the public raised concerns about the size and scale of the building, impacts of
the development on pedestrian safety, and the overall fit of the development in the neighborhood.
The Commission voted to continue the meeting, requesting the applicant provide additional details
on the following design considerations:
- Modify design to soften building bulk and height
- Consider a softer color palette
- Revisit the mansard-style roof corners; explore feasibility of a more authentic mansard
design
- Provide additional elevations from neighboring perspectives to illustrate visibility of the
fourth-floor penthouse
- Reevaluate garage access design in the rear alley to improve safety, visibility, and circulation
- Reconsider the fourth-floor trellis design to reduce its prominence from the front façade
At the October 28th meeting, the applicant highlighted changes made in response to prior feedback:
Building Massing:
- Middle sections stepped back by 6 inches
- Cornice and roof elements lowered
- Mansard roof corners revised to reflect a more authentic style
Color Palette:
- Updated to a softer, warmer tone
Visibility & Context:
- Additional renderings provided from neighboring viewpoints
Garage Access:
- Chamfered corners added
- Entrance set back 2 feet to align with neighboring garage aprons
Trellis Design:
- Lowered by 1 foot
- Stepped back from the front façade
- Profile modified to reduce visibility from the street
The Commission was appreciative of the applicant’s efforts to address their comments, however
remained concerned about the overall size and mass of the proposed development in comparison
with the neighboring properties. The Commission expressed desire to continue the meeting to allow
124
for additional discussion and to provide an opportunity for the petitioner to modify the design. The
applicant, however, requested the Commission make a recommendation to allow the process to
continue, and give them the opportunity to gain feedback from the Plan Commission. Given the
Commission’s concerns about the compatibility of the building’s size with its neighboring
properties, the Commission voted to forward a recommendation of denial of the proposal as
presented.
Design Guidelines
(1) Architectural Style and Considerations
a. Following the architectural intent of Kenilworth’s early planners as well as
consideration for the limited size of the Business District, development within the
Business District should consist of historic English architectural styles. New buildings
need not be historic replicas, but should offer high quality and compatible
interpretations of Tudor, Tudor Revival, and other historic English styles present
within Kenilworth. Interpretations should foster a residential feel for the Business
District as a whole.
b. In the limited instances where renovation should be considered, the Village encourages
improvements that lead to a design which is consistent with the desired architectural
style outlined. For those existing buildings with a quality design of another period that
is not Tudor, Tudor Revival, or other historic English influenced designs, the building
may be renovated to be consistent with the style in which it was originally built.
c. The prominent building at the southern entrance to the Business District, 400 Green
Bay Road, exhibits the traditional architectural details of smaller structural bays and
massing, limited building heights, variety in roof forms, mix of materials and special
attention to detailing and fenestration proportions and patterns. Buildings within the
Business District should incorporate similar traditional architectural details.
d. Buildings within the Business District should reflect sensitivity to the immediate site
surroundings and the Village-wide character.
e. All exterior walls of buildings should be treated with consistent architecture, details,
and materials.
f. The image below highlights some of the fundamental elements of Tudor Revival and
other historic English styles for development that is consistent with anticipated uses
in the Business District.
RESPONSE : Although the proposed development does not clearly represent a true to form Tudor, Tudor Revival or
other historical English architectural style, the Commission commented that the design is be a modern interpretation.
Adjustments were made to the design, in particular the mansard roof design, in response to feedback from the Commission
seeking the design to be more in line with a traditional mansard roof design.
(2) Placement and Orientation
a. Buildings in the Business District should be positioned at the property line and occupy
the entire lot-width to assist in creating a “streetwall” that enhances pedestrian comfort
and maintains pedestrian scale.
b. Gaps between buildings in the streetwall should be avoided, except where pedestrian
access to rear parking is designed and planned for.
125
c. In addition to providing pedestrian scale, a street wall contributes to the pedestrian
interest and circulation of the area. To this end, long, blank facades are discouraged.
d. Buildings throughout the Business District should have strong pedestrian orientation,
providing opportunities for window shopping, and outdoor dining.
e. Corner buildings should take advantage of their prominent locations with angled,
rounded or recessed corner entrances. Buildings located on corner lots should be built
out to both the front and corner side property lines. Given that the Business District
is only one lot deep, corner lots also play an important role in the transition between
the commercial and residential districts.
f. The placement of mid- block buildings at odd or irregular angles to the street is
prohibited.
RESPONSE : The proposed developments placement and orientation are consistent with the design guidelines.
(3) Building Height
a. Building Height Should be 2 ½ to 3 ½ stories in height (25’ – 35’)
b. When buildings are adjacent to residential neighbors, consideration should be given to
setting back portions of the buildings located at the second story or above from the
rear and side to soften the bulk and visual scale of the building. This may include
terracing or stepping rooflines, in keeping with the overall architectural style of the
building.
c. Careful consideration should be given to building elements at the ground level to
ensure that the buildings have human scale and create a harmonious environment.
RESPONSE : The proposed building height is 47’ 4”, exceeding the recommended height. The fourth floor is setback
to soften the bulk and visual scale of the building. The Commission discussed the potential to further set the 2nd and 3rd
floors back as well to further soften the bulk of the building. The proposed development’s height is not consistent with the
design guidelines.
(4) Building Materials
a. Authentic and high quality building materials are desired to convey the image of the
Village. These include natural color brick, stone, cast or carved stone, terra cotta, and
timbers with limited stucco on portions of Tudor -styled buildings. Decorative metal
and stone are desirable as finish materials for flashing, ornamentation around doors
and windows, and cornices
b. Brick, stone and cast stone should be the primary building materials on all exterior
walls of buildings in the Business District. Brick and stone selections should be
designed in a compatible range of colors rather than a single color selection for an
entire building, in order to avoid a flat and modern appearance.
c. Buildings obtain some of their character from the mix of materials, and creative use
of material combinations is encouraged to break up the massing. The number of façade
colors should be minimized to maintain a unified district.
d. Stucco may be permitted only when used on second floor walls or above. Exterior
insulation finish systems (EIFS) or Dryvit, wall siding of all types, metal/vinyl wall
panels, and wood siding are prohibited within the Business District.
126
e. Detail should be included on each building such as stone, brickwork and metalwork
to highlight windows and doors.
f. Overhead doors for the covered parking for upper floor residential units are preferred
to replicate stile and rail paneled doors if they are in view of the public or pedestrian
way. Overhead doors are allowed only on building openings that face alleys.
g. Building color should be compatible with the area’s character and enhance the
building’s visual appeal. Color should be used to complement the materials of a façade
and to highlight architectural features. Primary, bright, or excessively brilliant colors
are discouraged.
RESPONSE : Proposed building materials include manufactured Indiana limestone, wood clad / aluminum casement
windows, ¾” Cementitious stucco, James Hardie composite panel & trim, Davinci roofscapes composite slate roof, and
wood pergola/trellis. The proposed colors are “buff”, “castle gray”, and a warm grayish brown. For additional details
on the building materials and color, please refer to the meeting minutes.
(5) Facades
a. Exterior side walls visible from the public way shall be finished in materials similar to
the front facade.
b. The relationship of horizontal banding among buildings unifies the street elevation
and, the division of a building façade into horizontal bands provides human scale and
proportion to the façade.
c. A building base, middle and top should be strongly articulated through materials,
details and changes in the plane of the wall. Retail storefronts should be differentiated
from the façade of the upper stories. Storefront systems, awnings, and entrance doors
should be harmonious.
d. The use of decorative building elements consistent with the architectural style in a
rhythmic pattern is encouraged to break up large building masses. Columns, pilasters,
window placement and other architectural features should be used to divide facades
of large buildings into several smaller vertical segments. Structural elements and bays
should be architecturally expressed on the façade to add interest, scale, proportion,
and detail.
e. Multiple storefronts that are part of the same building should have complementary
façade designs, particularly with respect to color, cornice line and other architectural
details, and decorative materials. As used in these guidelines, facade shall mean the
exterior wall of the building.
RESPONSE : Vertical and horizontal design elements are introduced to break down the overall massing. Storefront
awnings and doorways and consistent in design. Second and third stories are partially setback to help differentiate between
ground floor retail and residential units. For additional details on the facade, please refer to the meeting minutes.
(6) Doors and Entrances
a. The entrances and their architectural details should be influenced by the overall
architectural style of the building, its intended use, and be appropriately sized and
designed. The entrance should be proportionately scaled to the overall building design.
b. Front entrances and retail storefronts should be prominent, easily discernible,
attractive and inviting to pedestrians, and add visual interest to the street.
c. The primary business entrance should be evident from the public way and
differentiated from the semi-public and private residential entrances.
127
d. Primary business entrances should consist of full glass panel doors and transoms
where appropriate. Recessed doorways are encouraged to provide cover from the
elements and to allow safer opening of doors.
RESPONSE : The proposed doorways and entrances are consistent with the design guidelines. The business entrances
consist of full glass panel doors, and are evident from the public right-of-way.
(7) Windows and Bays
a. Windows and window details should be appropriate for the architectural style of the
building, and true divided lites are encouraged where appropriate.
b. Large ground-floor bays and display windows on facades with bulkheads and transom
lites are strongly encouraged within the Business District.
c. Upper floor balconies, decks, terraces, and bay windows are appropriate on all sides
of buildings, but should not extend or overhang into the public right -of-way without
Village approval.
d. Windows on the upper floors’ exterior walls are encouraged and should be consistent
with the architectural style of the building. Upper floor windows should appear to be
“punched” openings within a solid wall, rather than a continuous row of windows
separated only by their frames. Upper floor windows shall be recessed, not flush with
the surface of the building.
e. Window glass should be clear or slightly tinted. Dark -tinted, spandrel, frosted, back -
painted, and smoked glass are discouraged on the front of buildings. If part of the
architectural design, they should be used sparingly and only where necessary to screen
the function of the interior space (such as storage areas, kitchens, bathrooms).
Mirrored or reflective glass is not permitted within the Business District.
f. Expanses of walls should not be visible from the public right -of-way. Consideration
should be given to incorporating features such as display windows, and material and
color variations.
g. Ground floor windows can be used for displays; however business owners shall allow
full and unobstructed views into their businesses. Completely obstructing windows
from the interior of a building with shelving, display cases, or other objects is
discouraged. features such as display windows, and material and color variations.
RESPONSE: The proposed ground floor windows are full glass panel doors. The upper floor windows are recessed
rather than flush with the surface of the building. No expanses of walls are visible from the public right -of-way, as
windows wrap the entire building.
(8) Roofs and Dormers
a. Rooflines, roof slopes, and architectural details should complement the building’s
architectural style.
b. Dormers and gables with purposeful space are encouraged to be incorporated within
the roof structure of a building, and not just applied decorative elements. Shed
dormers should not extend for more than 50% of the façade length.
c. Sloped mansard style roofs are prohibited within the Business District.
d. Roof parapets shall be utilized only in achieving the appropriate gabled architecture.
e. Cornices and other decorative detail are strongly encouraged along the rooflines of
buildings.
128
f. Eaves should have depth and should be appropriate to the building’s architectural style
as to create shade and shadow on the upper floor of the building. Eaves should be of
sufficient depth to accommodate ornamentation such as decorative brackets, dentils
and cornices.
g. Slate roofing is encouraged in the Business District, although clay tile and simulated
slate or tile may also be permitted provided they are consistent with the architectural
style and of high quality. Cedar shingles, cedar shakes, and asphalt shingles, in cluding
architectural shingles, are not encouraged.
h. Flashing, gutters, and downspouts are encouraged to be copper or other high quality,
metal materials.
RESPONSE : The proposed pitched roofs and traditional gabled forms attempt to reflect Kenilworth’s architectural
vernacular. A more traditional mansard roof was incorporated into the design to reflect recommendations from the
Architectural Review Commission. The use of slate tiles is proposed for roofing materials. Cornices were incorporated
and lowered to help soften the bulk of the building.
(9) Awnings and Canopies
a. Awnings are desired elements as they protect pedestrians from the elements, add color
and visual interest to the street, and contribute significantly to an area’s pedestrian
scale and interest.
b. Canopies should only be utilized for entrances to the residential portions of buildings
within the Business District.
c. Awnings and canopies shall be made of a canvas or durable fabric material that can be
easily cleaned. Hard plastic, vinyl, metal or other materials are prohibited.
d. Internal illumination of awnings is prohibited.
e. Awnings shall be constructed and erected so that the lowest portion of the projecting
frame and descending skirt shall not be less than 7’6” above the level of the sidewalk
or ground located below the awning.
f. Awnings may project over the public way but they should not be within two feet of
the curb line of a public street. A recommended minimum awning projection is three
feet; however the projection should be consistent with the style of awning and scale
of the building.
g. Where several storefronts are developed as a single building, they should have awnings
of a similar style, alignment, and color in order to maintain a sense of visual continuity.
h. Awnings and canopies should fit within the frame of the storefront window; they
should not hide the building’s façade, distort its proportions, or cover architectural
features.
i. Awnings may be fixed or retractable. Retractable awnings must be kept either in the
fully projected position or the fully closed position. Fixed awnings are to have
concealed rigid metal frames. Retractable awnings should have a canopy cover and
retractable rollers mounted to the building
j. The color of awnings and canopies shall complement and enhance the overall color
scheme of the building façade. Recommended colors are solid black, dark green and
dark blue.
RESPONSE : The proposed awnings and canopies over the proposed business and residential entry ways. The proposed
awnings and canopies are consistent with the design guidelines.
129
(10) Lighting
a. Appropriate and judicious lighting of a building’s façade is encouraged to identify
stores and businesses, promote a sense of safety and security, and highlight prominent
buildings and building features in the Business District. Excessive up-lighting shall be
avoided to reduce light pollution
b. Lighting shall be used to illuminate pedestrian and parking areas.
c. Lighting shall provide a sense of safety without having a negative effect on neighboring
properties and shall be located, aimed, lamped, or shielded to minimize glare, sky glow,
and stray light. Lights should not shine across property lines, especially along alleys
and into residential neighborhoods.
d. Lighting in the rear or side of Business District properties, including parking lot and
building lighting, shall not spill over into adjacent residential areas.
e. Building lighting fixtures should be subtle and understated, and consistent with the
architectural style of the Business District.
f. Fluorescent lighting with exposed fluorescent lamps is discouraged in street -level
interiors where visible from the public way.
g. Light fixtures and poles for parking areas should be consistent with the Village’s
architectural style.
h. Exterior lighting with an incandescent quality is encouraged, regardless of the lamp
type, to create a warm atmosphere.
RESPONSE : Exterior lighting fixtures will use full cut ‐off and shielded designs so that no glare reaches adjacent
properties. Safe lighting levels will be provided at the public street level.
(11) Parking, Overhead Doors and Service Areas
a. When possible, parking lots should be located behind buildings. Parking lots in front
of buildings are discouraged. Infill redevelopment of existing surface parking lots
located between buildings is encouraged.
b. Access to parking lots should be provided from alleys to maximize the development
potential of the Business District and to maintain a safe and comfortable pedestrian
environment along Green Bay Road.
c. New curb cuts and access drives are discouraged along Green Bay Road, and
redundant and unnecessary curb cuts should be eliminated.
d. Parking lots should be screened from view from all public right -of-way except alleys,
including sidewalks and streets, through the use of landscaping and low masonry walls.
Planters and landscaped areas should buffer parking and service areas from adjacent
uses. Plantings should consist of low evergreen and deciduous shr ubs planted in
conjunction with low -growing annual or perennial plants and groundcover. Large
expanses of exposed mulch shall be avoided.
e. Parking lot landscaping should include “landscape islands” at a ratio of approximately
one per fifteen parking spaces. Landscape islands should consist of canopy trees
(initially 3 to 4 inches in caliper), attractive groundcover, and/or decorative shrubs
(initially 2 to 3 feet in height).
f. All parking lots should be well marked, sufficiently lit, provided with proper drainage
and include clearly marked pedestrian pathways.
g. In order to reduce or minimize paved parking areas, shared parking is encouraged
where adjacent buildings have interior uses which offset each other in their use of the
130
parking lot subject to the requirements of the zoning ordinance. For example, a
business with daytime employee and shopper parking may create an opportunity for
evening use of the same lot by evening shoppers or restaurant patrons.
h. Trash receptacles, dumpsters and service areas shall be located inside the primary
building or be fully enclosed by masonry walls and screened with landscaping
i. Service areas and overhead doors are to be located off secondary streets or alleys. All
service areas are to be treated with masonry walls and/or appropriate landscaping at 6
feet in height from the ground level.
j. Decorative metal fencing should be used where appropriate to enhance and define
open spaces, landscaped areas and building entrances. Such fencing should not be
more than four feet in height. Chain link fences are prohibited.
k. The rear of commercial buildings shall be well kept, with rear exterior walls being
comparable to the facades. Secondary rear entrances to stores and shops are
encouraged in blocks where public parking or pedestrian walkways are located behind
the buildings.
l. Mechanical equipment must not be visible from the public right-of-way. Roof -
mounted equipment should be located so as not to be visible from the primary or
secondary approach and screened from residential areas.
m. Grade-level mechanical and utility equipment should be screened from public view
with an enclosure or screening element integral to the building design, masonry walls
or landscaping.
RESPONSE : The proposed parking garage is built into the ground floor of the development, with entry via the alley.
The garage access includes chamfered corners to setback the entry to match neighboring garage apron access. The parking
garage is intended for residents of the building only. Ductwork, HVAC, waste handling will be located away from
adjacent residential windows and public view. The design will include screening of visible service or mechanical areas,
landscaping buffers, and architectural transitions so that the building’s form does not seem har sh or jarring to adjacent
properties.
(12) Other Considerations
a. Sidewalk seating and tables for cafes are encouraged. However, these improvements
should not overwhelm the sidewalk nor impede pedestrian circulation along the
sidewalk.
b. Parkway landscaping should consist of salt -tolerant street trees, groundcover and
perennials. Street trees and other landscaping along the public rights-of-way should be
protected from motorized and pedestrian traffic by street curbs and tree grates.
c. Landscaping should be healthy and attractive. Maintenance programs performed on a
regular basis should be established as part of new development approvals.
Maintenance should include turf mowing, periodic fertilization, pruning, and the clean-
up of litter and debris.
d. Decorative planters may be placed at Business District entrances only where they will
not impede the safe flow of pedestrian traffic.
e. Throughout the design and building process, the Village encourages a sustainable
approach that balances environmental responsiveness, resource efficiency, and cultural
and community sensitivity, with the owner’s economic viability. Using the USGBC
LEED Rating System as a tool or guide is a good measure of a project’s sustainable
performance and benefits the property owner, the residents, and the planet.
131
RESPONSE : The proposed development showcases sidewalk seating for potential businesses. Proposed landscaping
includes planters and rooftop plantings.
132
Plan Commission Findings of Fact for PUD Application
(1) Special use standards. No special use for a planned development shall be
recommended or granted pursuant to this section unless the applicant shall establish
that, in addition to the standards set forth in this section 153.246(C), the proposed
development will meet each of the standards made applicable to special uses pursuant
to § 153.245(G).
(1) The necessity for the public convenience at the particular proposed location.
PLAN COMMISSION RESPONSE: Impacts associated with the development do not
outweigh the benefits to public convenience. The proposed development’s height exceeds
40’ and is larger than what is appropriate for the community.
(2) The effects of the proposed design, location and operation on the public health, safety
and welfare.
PLAN COMMISSION RESPONSE: Existing parking and traffic adjacent to the Property
on Park Drive and the rear alley creates challenges for residents and business owners
alike. The addition of new residential and retail space will amplify these concerns to the
detriment of residents due to the increase in delivery drivers, building occupants, and new
retail customers.
(3) Injury to the value of other property in the neighborhood in which it is proposed to be
located.
PLAN COMMISSION RESPONSE: The height of the proposed development will limit the
amount of light filtering into neighboring buildings, thereby impacting the property value.
(4) Interference with the use and enjoyment of neighboring properties.
PLAN COMMISSION RESPONSE: Neighboring properties will face increased challenges
using the alley to access their garages due to the introduction of condominiums and an
alley facing parking garage. Further, the building height will shade the rear yard of a
neighboring home, limiting the homeowner’s ability to utilize their yard for gardening and
birdwatching.
(5) Compatibility with permitted uses in the district in which it is proposed to be located.
PLAN COMMISSION RESPONSE: The uses for the first-floor commercial spaces are not
known. Above floor residential is found elsewhere in the District, but at a lower density.
(6) Increased traffic congestion on public ways or increased parking required on public
ways.
PLAN COMMISSION RESPONSE: Existing parking and traffic adjacent to the Property
on Park Drive and the rear alley creates challenges for residents and business owners
alike. The addition of new residential and retail space will amplify these concerns to the
detriment of residents due to the increase in delivery drivers, building occupants, and new
retail customers.
(7) Damage or destruction of natural scenic or historic features of significance to the
village or the immediate neighborhood.
133
PLAN COMMISSION RESPONSE: Demolition of a structure found to be of architectural
value to the community would be required to redevelop the Property.
(8) In the case of playground equipment, in addition to the foregoing applicable factors,
its proximity to and effect on neighboring properties, its expected intensity of use, and the
consistency of the equipment and its expected use with play equipment c ustomarily
associated with a residential use.
PLAN COMMISSION RESPONSE: This standard is not relevant to the Application, as no
playground equipment is proposed.
(2) Minimum area of development. The applicant shall have the burden of
establishing that the subject property is of sufficient size and shape to be planned and
developed as a unified whole capable of meeting the objectives of planned unit
developments pursuant to this section.
PLAN COMMISSION RESPONSE: The scale of the building is greater than what the location can
accommodate in order to not adversely impact neighboring properties. The development will
impact congestion, adequate light supply, and the consistency in building height found in the B -
District.
(3) Unified ownership required. The entire property proposed for planned
development treatment shall be in single ownership or under unified control as to
ensure that the entire property will be developed as a unified whole. All the owners of
the property shall be included as joint applicants on all applications and all approvals
shall bind all owners. The violation of any owner as to any tract shall be deemed a
violation as to all owner and all tracts.
PLAN COMMISSION RESPONSE: The property will be under ownership by RED3 Development,
LLC.
(4) Compliance with village code required. Construction and improvements with
any planned unit development shall comply with all applicable village ordinances. Any
proposed deviation from village standards or requirements must be clearly listed on the
preliminary plan application and fully justified as being both necessary to the proper
development of the property and consistent with the objectives set forth in the
applicable section of the village code.
PLAN COMMISSION RESPONSE: The proposed building height exceeds what is permitted by
Village Code. The impacts from the building height to the community, such as loss in property
value and light supply, do not merit granting a variance to the applicable regulations.
(5) Design requirements. The planned unit development as a whole, as well as the
individual buildings and site improvements constructed as part of the planned unit
development, shall be in general conformity with the Kenilworth Design Guidelines—
Business District.
PLAN COMMISSION RESPONSE: The Architectural Review Commission recommended to deny
a Certificate of Appropriateness for the Property. This recommendation indicates that the proposal
does not meet the Village’s Design Guidelines for the Business District.
134
(6) Compatibility of uses and design. The uses permitted in the planned unit
development shall be compatible with each other and with existing land uses in the
surrounding area. Uses shall be deemed compatible if all of the following criteria are
met.
(a) The individual uses in the planned unit development must be permitted uses
or permitted special uses in the B Business District, unless a use deviation is approved
by the Board of Trustees. Any individual use that is allowed only as a special use in the
B Business District must individually meet the standards for the granting of special use
permits, as established in § 153.245.
(b) The uses must be designed and located in conformity with the surrounding
development and adjacent properties.
PLAN COMMISSION RESPONSE: The uses for the first-floor commercial spaces are not known.
Above floor residential is found elsewhere in the District, but at a lower density.
(7) Covenants and restrictions to be enforceable by village. All covenants, deed
restrictions, easements and similar restrictions to be recorded in connection with the
planned unit development shall provide that they may not be modified, removed or
released without the express consent of the Board of Trustees and that they may be
enforced by the village as well as by future landowners within the proposed
development.
PLAN COMMISSION RESPONSE: Not applicable.
(8) Public open space and contributions. Whenever the village comprehensive plan
or official map indicates that development of a planned unit development will create a
need for land for public purposes of the village within the proposed planned unit
development, the Board of Trustees may require that the area be designated and to the
extent the need is specifically and uniquely attributable to the proposed development,
dedicated to the village for the use. In addition, the Board of Trustees may require
evidence that all requirements of village ordinances pertaining to the dedication of land
or the contribution of cash in connection with subdivisions or developments of land have
been met as respects the proposed planned unit development.
PLAN COMMISSION RESPONSE: Not applicable.
(9) Common open space.
(a) Amount, location and use. When common open space is provided in a
planned unit development, the amount and location of the open space shall be
consistent with its intended function as set forth in the application and planned unit
development plans. No open space shall be used for the construction of any structure or
improvement except the structures and improvements as may be approved in the final
plan as appropriate to the intended leisure and recreational uses for which the open
space is intended.
(b) Preservation. Adequate safeguards, including recorded covenants or
dedication of development rights, shall be provided to prevent the subsequent use of
common open space for any use, structure, improvement or development other than
135
that shown on the approved final plan. The restrictions must be permanent and not for a
given period of years and must run with the land.
(c) Ownership and maintenance. The final plan shall include provisions for the
ownership and maintenance of the open space and improvements as are reasonably
necessary to ensure their continuity, care, conservation, maintenance and operation in
accordance with predetermined standards and to ensure that remedial measures will be
available to the village if the open space or improvements are permitted to deteriorate or
are not maintained in a condition consistent with the best interests of the planned unit
development or the village.
PLAN COMMISSION RESPONSE: Not applicable.
(10) Property owners’ association. When the requirements of paragraph(C)(9)
above are to be satisfied by the ownership or maintenance of the open space or
improvements by a property owners’ association, the association shall meet each of the
following standards.
(a) The bylaws and rules of the association and all declarations, covenants and
restrictions to be recorded must be approved as part of the final plan prior to becoming
effective. Each document shall provide that it shall not be amended in any manner that
would result in it being in violation of the requirements of this subsection.
(b) The association must be established and all covenants and restrictions
recorded prior to the sale of any property within the area of the planned unit
development designated to have the exclusive use of the proposed open space or
improvements.
(c) The association must be responsible for casualty and liability insurance, taxes
and the maintenance of the open space and improvements to be deeded to it.
(d) Membership in the association must be mandatory for each property owner,
and any successive owner, having a right to the use or enjoyment of open space or
improvements.
(e) Every property having a right to the use or enjoyment of the open space or
improvements must pay its pro rata share of the cost of the association by means of an
assessment to be levied by the association that meets the requirements for becoming a
lien on the property in accordance with statutes of the state.
(f) The association must have the right to adjust the assessment to meet
changed needs. The membership vote required to authorize the adjustment shall not be
fixed at more than 51% of the members voting on the issue.
(g) The village must be given the right, but not the obligation, to enforce the
covenants.
(h) The village must be given the right, after ten days’ written notice to the
association, to perform any maintenance or repair work that the association has
neglected to perform, to assess the membership for the work and to have a lien against
the property of any member failing to pay the assessment. For this purpose alone, the
village shall have all the rights and powers of the association and its governing body
under the agreements and declarations creating the association.
PLAN COMMISSION RESPONSE: Not applicable.
136
(11) Landscaping and perimeter treatment. Any area of a planned unit
development not used for structures or circulation elements shall be landscaped or
otherwise improved. The perimeter of the planned unit development shall be treated so
as to ensure compatibility with surrounding uses by means such as provision of
compatible uses and structures; setbacks; screening; or natural or human-made buffers.
PLAN COMMISSION RESPONSE: Not applicable; building / impervious surface are proposed to
be lot line to lot line.
(12) Utilities. All utility lines shall be installed underground.
PLAN COMMISSION RESPONSE: Not applicable to preliminary PUD review.
(13) Traffic plan. The final plan for the planned unit development shall include a
traffic plan that identifies points of ingress and egress, streets, alleys and interior
circulation routes. The traffic plan shall be designed to minimize traffic congestion in the
public streets adjoining the planned unit development and to facilitate the free flow of
both vehicular and pedestrian traffic, within the planned unit development. The streets,
alleys and other traffic thoroughfares approved in planned unit development shall
comply with the minimum requirements of the village’s ordinances, rules and
regulations, unless a deviation is approved by the Board of Trustees.
PLAN COMMISSION RESPONSE: Final plan not yet submitted.
(14) Range of uses. The planned unit development shall accommodate, as
appropriate, a mix of office/service, retail commercial, and residential land uses.
PLAN COMMISSION RESPONSE: Retail and residential space are proposed for the
development.
(15) Enhancing community. The planned unit development shall promote a strong
community identity and opportunities to interact while building a healthy commercial tax
base.
PLAN COMMISSION RESPONSE: The building scale exceeds what is appropriate for the
community’s identity. No commercial tenants have been confirmed; tax -base cannot yet be
verified.
(16) Public benefit. The planned unit development shall provide a substantial
benefit to the village and the public by maintaining the essential quality, viability and
attractiveness of village’s business district while encouraging new economic
development consistent with the character of the village.
PLAN COMMISSION RESPONSE: The proposed development does not maintain the essential
quality or viability of the business district. Traffic congestion, inconsistent building massing, and
loss of light supply to neighboring structures do not create a public benefit.
(D) Supplemental standards. The appropriateness and viability of a planned unit
development may also be evaluated by the Plan Commission and the Board of Trustees
based on the following supplemental criteria:
137
(1) Additional landscaping, buffering or screening within or around the perimeter of
the planned unit development;
PLAN COMMISSION RESPONSE: Screening on the fourth floor creates an undesirable
visual impact.
(2) Location and screening of parking facilities;
PLAN COMMISSION RESPONSE: Parking is fully enclosed within the first floor.
(3) Community amenities (such as, but not limited to, public art and gardens, public
transportation shelters);
PLAN COMMISSION RESPONSE: None provided in the proposal.
(4) Inclusion of sustainable design and green architecture;
PLAN COMMISSION RESPONSE: Green architecture elements were not included in the
proposal.
(5) Preservation of environmental features; and
PLAN COMMISSION RESPONSE: Not applicable.
(6) Preservation of historic features.
PLAN COMMISSION RESPONSE: Demolition of a structure found to be of special
importance, meaning it meets code criteria for architectural/historical significance, would
be required to redevelop the Property.
138
PERMIT NO. ADDRESS TYPE OF WORK COST OF IMPROVEMENT PIN PERMIT FEE
PB25-0074 523 SHERIDAN RD Res Swimming Pool $212,950.00 05221000440000 $7,388.50
PB25-0082 74 ROBSART RD Res Solar Panel $45,120.00 05273000420000 $1,803.60
PB25-0187 724 MACLEAN AVE Res Window-Door $200.00 05281050080000 $160.00
PB25-0199 230 OXFORD RD Res Elevator $60,207.00 05273000190000 $1,906.21
PB25-0202 220 MELROSE AVE Res Elevator $58,860.00 05271000370000 $1,865.80
PB25-0206 337 ABBOTSFORD RD Res Water Heater $3,038.71 05282240020000 $91.16
PC25-0008 624 GREEN BAY RD Com Interior Alt or Repair $91,674.00 05281031190000 $3,450.22
PF25-0023 523 SHERIDAN RD Res Fence $4,080.00 05221000440000 $60.00
TOTALS IN DECEMBER 2025 $476,129.71 $16,725.49
8 PERMITS ISSUED IN DECEMBER 2025
8 Issued in DECEMBER 2024 Dec-24 $538,453.16 $18,294.85
Total Permits Issued 2025 Fiscal Year 221 2025 FY To Date $24,830,220.41 $761,282.54
BUILDING PERMITS ISSUED BY THE VILLAGE OF KENILWORTH DURING THE MONTH OF DECEMBER 2025
* permit fee amounts include permit fee, commission application fee, and plan review fees
139
REVENUES AND EXPENDITURES BOOK AS OF 12/31/2025
MONTHLY REPORT OF FINANCIAL ACTIVITY BY FUND
REVENUE AND EXPENDITURE REPORT FOR VILLAGE OF KENILWORTH 1/14Page:01/14/2026 03:26 PM
User: JSCHMIDT
DB: Kenilworth
PERIOD ENDING 12/31/2025
% Fiscal Year Completed: 100.00
% BDGT
USED
YTD BALANCE
12/31/2025
ACTIVITY FOR
MONTH
12/31/25
2025
AMENDED BUDGET
YTD BALANCE
12/31/2024
ACTIVITY FOR
MONTH
12/31/24
2024
AMENDED BUDGETDESCRIPTIONGL NUMBER
Fund 01 - GENERAL FUND
50.38 1,398,777.79 0.00 2,776,363.00 2,625,770.26 37,703.88 2,455,096.00 CURRENT TAX LEVY01-100-3001
58.09 441,376.15 0.00 759,873.00 834,908.74 (7,797.34)815,000.00 CURRENT TAX LEVY POLPEN01-100-3002
82.75 43,344.79 0.00 52,382.00 62,258.17 2,875.99 75,962.00 REPLACEMENT TAX01-100-3004
122.48 367,452.08 0.00 300,000.00 212,144.65 17,483.45 130,000.00 STATE SALES TAX01-100-3005
99.53 427,993.46 0.00 430,000.00 426,929.31 22,017.36 320,000.00 STATE INCOME TAX01-100-3006
108.11 37,839.81 0.00 35,000.00 94,163.61 8,161.22 97,000.00 LOCAL USE TAX01-100-3007
80.08 3,555.44 0.00 4,440.00 4,013.79 315.41 2,501.00 CONSUMPTION TAX01-100-3008
111.12 113,337.78 5,583.55 102,000.00 94,300.14 931.68 92,000.00 UTILITY TAX-COMED01-100-3010
99.17 74,374.24 0.00 75,000.00 67,219.22 5,040.37 72,000.00 UTILITY TAX-NICOR01-100-3011
110.44 33,133.48 0.00 30,000.00 36,673.20 2,965.67 30,000.00 UTILITY TAX-TELECOM01-100-3012
99.93 82,942.49 0.00 83,000.00 81,364.67 (7,957.03)84,000.00 911 DISBURSEMENT - JETSB FUNDS01-100-3020
121.88 21,938.18 0.00 18,000.00 20,383.48 0.00 17,000.00 MISC TAX-FOREIGN FIRE TAX01-100-3029
132.94 997.08 0.00 750.00 1,487.00 0.00 750.00 CIRCUIT COURT FINES01-100-3101
135.43 21,668.57 1,480.00 16,000.00 9,805.00 420.00 18,000.00 VILLAGE ORDINANCE FINES01-100-3102
95.72 76,576.00 185.00 80,000.00 80,590.00 625.00 80,000.00 VEHICLE LICENSE01-100-3201
65.77 986.50 20.00 1,500.00 1,505.00 200.00 1,600.00 ANIMAL LICENSE01-100-3202
111.76 4,750.00 3,750.00 4,250.00 4,750.00 3,750.00 4,000.00 LIQUOR LICENSE01-100-3203
101.91 662,445.28 14,193.17 650,000.00 650,918.64 36,704.49 300,000.00 PERMITS-BUILDING01-100-3301
110.01 73,704.14 2,400.00 67,000.00 56,609.96 3,664.16 27,000.00 PLAN REVIEW01-100-3306
104.38 8,350.00 200.00 8,000.00 9,200.00 300.00 5,000.00 ZONING REVIEW01-100-3307
216.95 5,727.53 0.00 2,640.00 4,900.00 350.00 1,050.00 ZBA FILING FEE01-100-3308
300.00 1,050.00 0.00 350.00 350.00 0.00 350.00 BRC (DEMO) FILING FEES01-100-3309
0.00 0.00 0.00 300.00 200.00 0.00 500.00 TREE PERMIT01-100-3310
242.86 1,700.00 350.00 700.00 700.00 0.00 350.00 ARC FILING FEE01-100-3311
166.67 1,250.00 0.00 750.00 1,050.00 225.00 750.00 RE-INSPECTION FEE01-100-3312
182.40 2,736.00 120.00 1,500.00 894.00 90.00 1,500.00 CONSTRUCTION PARKING PERMITS01-100-3398
145.96 14,595.50 237.00 10,000.00 13,575.00 929.00 10,000.00 PERMITS-PARKING01-100-3399
11.57 2,314.68 0.00 20,000.00 12,375.26 0.00 20,000.00 AMBULANCE USERS FEE01-100-3401
354.25 3,542.50 75.00 1,000.00 725.00 0.00 2,500.00 SPECIAL EVENT & USE FEE01-100-3402
182.78 329.00 0.00 180.00 393.00 0.00 100.00 ELEVATOR INSPECTIONS01-100-3403
71.67 4,300.00 1,975.00 6,000.00 5,975.00 2,675.00 6,500.00 FIRE AND BURGLAR ALARM FEES01-100-3404
102.50 10,250.00 165.00 10,000.00 9,632.50 387.50 9,000.00 YARD WASTE STICKERS01-100-3405
35.00 1,050.00 0.00 3,000.00 4,162.50 300.00 3,000.00 SPECIAL DUTY DETAIL01-100-3407
100.05 96,045.90 16,000.00 96,000.00 96,000.00 8,000.00 96,000.00 REFUSE & RECYCLING FEES01-100-3432
91.61 171,865.81 0.00 187,601.00 359,037.04 152,557.84 182,136.00 ANTENNA LEASE FEES01-100-3436
100.00 1.00 0.00 0.00 225.66 203.06 0.00 MISCELLANEOUS FEES01-100-3499
44.88 21,993.58 0.00 49,000.00 46,271.63 9,619.38 51,000.00 CABLE TV FRANCHISE FEE01-100-3501
0.00 0.00 0.00 0.00 300,905.00 0.00 0.00 STATE GRANTS01-100-3603
100.00 2,460.00 0.00 0.00 12,968.38 10,000.00 0.00 GRANTS - MISC01-100-3605
118.54 308,194.13 0.00 260,000.00 278,339.04 23,500.06 125,000.00 INTEREST INCOME01-100-3701
100.00 223.00 0.00 0.00 0.00 0.00 0.00 INSURANCE PROCEEDS (IRMA)01-100-3801
0.00 0.00 0.00 0.00 138,820.00 138,820.00 0.00 ADJUSTMENT-EXCESS INS SURPLUS01-100-3802
0.00 0.00 0.00 0.00 14,554.00 4,554.00 0.00 ADJUST-DEDUCTIBLE RESERVE01-100-3803
100.00 268.66 0.00 0.00 1,175.00 0.00 1,500.00 SALE OF FIXED ASSETS01-100-3901
525.00 5,250.00 0.00 1,000.00 15,093.25 0.00 1,000.00 TREE CONTRIBUTIONS01-100-3904
98.47 8,741.92 261.00 8,878.00 5,435.07 1,030.30 3,000.00 OTHER INCOME01-100-3989
101.56 248,486.17 24,757.69 244,663.00 216,598.96 25,174.45 277,563.00 REGULAR SALARIES01-100-4010
0.00 0.00 0.00 15,000.00 0.00 0.00 19,500.00 MERIT-VACATION BUY BACK01-100-4019
0.00 0.00 0.00 0.00 4,554.00 0.00 43,273.00 PART TIME SALARIES01-100-4021
100.00 3,200.00 400.00 0.00 1,600.00 0.00 4,800.00 AUTO ALLOWANCE01-100-4023
155.38 14,090.23 2,698.06 9,068.00 17,000.39 2,265.59 22,086.00 EMPLOYEE BENEFITS-MEDICAL01-100-4028
122.77 608.96 134.99 496.00 1,138.66 159.49 1,208.00 EMPLOYEE BENEFITS-DENTAL01-100-4029
98.16 529.10 (15.50)539.00 592.67 148.77 520.00 EMPLOYEE BENEFITS-LIFE01-100-4030
98.87 18,505.33 1,292.57 18,717.00 19,255.30 1,836.90 24,911.00 FICA & MEDICARE-EMPLOYER01-100-4031
37.91 1,864.50 188.20 4,918.00 4,428.67 728.15 6,449.00 IMRF-EMPLOYER01-100-4032
140
REVENUES AND EXPENDITURES BOOK AS OF 12/31/2025
MONTHLY REPORT OF FINANCIAL ACTIVITY BY FUND
REVENUE AND EXPENDITURE REPORT FOR VILLAGE OF KENILWORTH 2/14Page:01/14/2026 03:26 PM
User: JSCHMIDT
DB: Kenilworth
PERIOD ENDING 12/31/2025
% Fiscal Year Completed: 100.00
% BDGT
USED
YTD BALANCE
12/31/2025
ACTIVITY FOR
MONTH
12/31/25
2025
AMENDED BUDGET
YTD BALANCE
12/31/2024
ACTIVITY FOR
MONTH
12/31/24
2024
AMENDED BUDGETDESCRIPTIONGL NUMBER
Fund 01 - GENERAL FUND
44.23 243.24 0.00 550.00 573.33 0.00 296.00 UNEMPLOYMENT-EMPLOYER01-100-4033
0.00 0.00 0.00 0.00 25,000.00 0.00 25,000.00 IMRF- ADDITIONAL CONTRIBUTION01-100-4040
113.74 25,250.00 0.00 22,200.00 22,485.00 0.00 25,215.00 AUDITING01-100-5021
99.97 542.85 0.00 543.00 721.09 0.00 900.00 JULIE FEES01-100-5022
99.20 130,050.78 22,830.54 131,096.00 107,560.41 15,273.56 56,750.00 PLAN REVIEW & INSPECT. SERVICES01-100-5023
52.82 5,678.04 1,129.00 10,750.00 11,992.24 1,465.34 9,100.00 PRINTING AND PUBLISHING01-100-5036
134.58 3,184.13 0.00 2,366.00 2,311.55 192.84 2,400.00 TELEPHONE01-100-5041
93.03 558.19 112.06 600.00 183.30 0.00 650.00 CELL PHONE01-100-5042
103.47 11,767.89 0.00 11,373.00 11,920.98 1,114.18 11,638.00 MISCELLANEOUS SERVICE01-100-5051
159.79 2,300.96 414.66 1,440.00 1,421.10 9.68 3,660.00 POSTAGE01-100-5071
97.74 13,723.85 150.00 14,041.00 12,260.48 132.00 11,570.00 DUES, MEMBERSHIPS & SUBSCRIPT01-100-5091
55.33 5,129.45 0.00 9,270.00 61,489.20 0.00 9,917.00 PROFESSIONAL SERVICES01-100-5092
89.67 58,714.84 5,214.36 65,476.00 55,169.25 14,883.75 59,535.00 PROF SERVICE-FINANCE01-100-5093
94.10 78,254.15 9,372.35 83,157.00 64,519.35 8,104.19 67,200.00 PROF SERVICES-BPZ-MISC01-100-5095
94.32 167,601.18 35,555.29 177,694.00 125,007.93 9,954.85 77,500.00 PROF SERVICES-PLANNING01-100-5096
0.00 0.00 0.00 0.00 24,591.79 0.00 0.00 PROF SERVICES-EXEC SEARCH01-100-5097
0.00 0.00 0.00 0.00 0.00 0.00 4,000.00 PROF SERVICES-HISTORIC PRESERV01-100-5098
0.00 0.00 0.00 0.00 0.00 0.00 22,500.00 PROF SERVICES-ECON DEVELOPMENT01-100-5099
90.88 37,942.49 6,941.34 41,750.00 40,202.90 6,676.00 44,784.00 PROFESSIONAL SERVICES-IT01-100-5100
0.00 0.00 0.00 0.00 0.00 0.00 500.00 REPAIR/MAINT VEHICLE & EQUIP01-100-5178
34.52 731.87 154.34 2,120.00 1,894.93 51.14 2,500.00 OFFICE SUPPLIES01-100-6024
90.17 721.36 0.00 800.00 1,394.60 10.55 600.00 OTHER SUPPLIES01-100-6025
22.86 440.00 0.00 1,925.00 1,099.00 625.00 2,400.00 RECRUITMENT & TRAINING01-100-7003
29.84 537.08 163.55 1,800.00 7,455.43 17.56 1,440.00 MISCELLANEOUS EXPENSE01-100-7005
88.38 3,813.77 0.00 4,315.00 1,115.15 35.00 1,770.00 MEETINGS & CONFERENCES01-100-7006
0.00 0.00 0.00 250.00 150.00 0.00 250.00 VILLAGE EVENTS01-100-7030
100.00 2,250,000.00 0.00 2,250,000.00 0.00 0.00 0.00 FUNDS TRANSFER OUT01-100-7395
100.00 397.00 0.00 0.00 0.00 0.00 0.00 MACHINERY & EQUIPMENT01-100-8002
118.32 18,664.37 824.61 15,775.00 11,217.78 1,643.86 13,044.00 SOFTWARE01-100-8003
0.00 0.00 0.00 0.00 914.49 0.00 0.00 COMPUTER EQUIPMENT01-100-8004
0.00 0.00 0.00 200.00 600.49 0.00 1,205.00 MAINTENANCE OF OFFICE EQUIP01-200-5001
100.00 95,000.00 0.00 95,000.00 86,157.50 0.00 90,497.00 INSURANCE-GENERAL LIABILITY01-200-5004
89.65 34,066.00 0.00 38,000.00 36,924.50 0.00 37,616.00 INSURANCE-WORKERS COMP01-200-5005
90.08 46,841.13 5,230.63 52,000.00 67,824.68 12,464.37 55,000.00 VILLAGE ATTORNEY-BASE01-200-5024
37.08 1,557.50 0.00 4,200.00 4,025.00 525.00 4,200.00 VILLAGE PROSECUTOR01-200-5025
70.83 7,082.50 0.00 10,000.00 9,290.00 0.00 8,000.00 VILL ATTORNEY-COMP PLAN & COMM01-200-5027
78.59 21,613.00 2,018.50 27,500.00 24,041.60 2,275.90 21,000.00 VILL ATTORNEY ZONING/ZBA01-200-5028
0.00 0.00 0.00 0.00 1,000.00 0.00 0.00 VILL ATTORNEY-SUBDIVISIONS01-200-5029
91.38 2,741.35 431.64 3,000.00 2,854.22 209.00 2,520.00 INTERNET SERVICES01-200-5044
101.00 16,296.04 1,667.57 16,134.00 15,827.88 1,709.64 15,472.00 MAINTENANCE SALARIES01-300-4010
52.46 629.51 242.74 1,200.00 364.58 56.56 1,200.00 OVERTIME01-300-4011
0.00 0.00 0.00 0.00 0.00 0.00 150.00 MERIT-VACATION BUY BACK01-300-4019
85.52 3,979.19 713.85 4,653.00 3,737.40 674.93 4,366.00 EMPLOYEE BENEFITS-MEDICAL01-300-4028
80.00 215.21 38.85 269.00 215.21 38.83 268.00 EMPLOYEE BENEFITS-DENTAL01-300-4029
94.40 1,241.42 141.66 1,315.00 1,181.62 124.10 1,260.00 FICA & MEDICARE EMPLOYER01-300-4031
36.14 125.03 14.11 346.00 313.80 33.71 331.00 IMRF-EMPLOYER01-300-4032
94.65 4,208.00 268.72 4,446.00 4,282.32 540.12 4,000.00 OUTSIDE MAINT-TRAIN STATION01-300-5046
126.87 5,709.00 0.00 4,500.00 5,319.50 0.00 8,275.00 OUTSIDE MAINT SERVICES-PW01-300-5047
84.46 17,281.00 615.00 20,460.00 15,206.76 466.00 17,380.00 OUTSIDE MAINT SERVICE-VIL HALL01-300-5048
100.00 50.00 0.00 50.00 50.00 0.00 50.00 PROFESSIONAL SERVICES01-300-5092
113.80 1,934.59 135.60 1,700.00 1,978.50 64.74 1,600.00 JANITORIAL SUPPLIES01-300-6023
93.38 233.46 11.25 250.00 731.04 0.00 500.00 BLDG REPAIRS-TRAIN STATION01-300-6024
116.40 9,311.75 1,367.28 8,000.00 10,679.95 2,464.51 5,000.00 BLDG REPAIRS-VILLAGE HALL01-300-6025
100.00 600.00 0.00 0.00 2,110.96 8.99 6,000.00 BLDG REPAIRS-PUBLIC WORKS01-300-6026
99.76 1,995.18 191.45 2,000.00 1,948.67 48.35 2,000.00 MAINT & CONSTRUCTION SUPPLIES01-300-6027
141
REVENUES AND EXPENDITURES BOOK AS OF 12/31/2025
MONTHLY REPORT OF FINANCIAL ACTIVITY BY FUND
REVENUE AND EXPENDITURE REPORT FOR VILLAGE OF KENILWORTH 3/14Page:01/14/2026 03:26 PM
User: JSCHMIDT
DB: Kenilworth
PERIOD ENDING 12/31/2025
% Fiscal Year Completed: 100.00
% BDGT
USED
YTD BALANCE
12/31/2025
ACTIVITY FOR
MONTH
12/31/25
2025
AMENDED BUDGET
YTD BALANCE
12/31/2024
ACTIVITY FOR
MONTH
12/31/24
2024
AMENDED BUDGETDESCRIPTIONGL NUMBER
Fund 01 - GENERAL FUND
100.00 2,548.26 0.00 0.00 704.99 704.99 2,700.00 HEATING, ELECT & WATER UTIL01-300-6028
0.00 0.00 0.00 0.00 229.97 0.00 0.00 MACHINERY & EQUIPMENT01-300-8002
100.76 219,471.39 21,556.57 217,820.00 213,202.21 22,195.25 207,664.00 REGULAR SALARIES01-400-4010
93.55 6,548.16 2,524.66 7,000.00 3,792.99 588.69 10,000.00 OVER TIME SALARIES01-400-4011
0.00 0.00 0.00 1,300.00 0.00 0.00 1,560.00 MERIT-VACATION BUY BACK01-400-4019
121.13 45,471.27 8,530.30 37,538.00 41,453.45 7,512.93 45,402.00 EMPLOYEE BENEFITS-MEDICAL01-400-4028
87.94 2,454.32 464.62 2,791.00 2,373.18 432.15 2,791.00 EMPLOYEE BENEFITS-DENTAL01-400-4029
101.34 415.48 0.00 410.00 441.73 36.43 386.00 EMPLOYEE BENEFITS-LIFE01-400-4030
105.04 16,651.82 1,790.32 15,853.00 15,899.87 1,597.34 15,210.00 FICA & MEDICARE EMPLOYER01-400-4031
36.44 1,672.77 178.20 4,590.00 4,204.56 432.63 4,406.00 IMRF EMPLOYER01-400-4032
43.13 237.24 0.00 550.00 386.67 0.00 195.00 UNEMPLOYMENT EMPLOYER01-400-4033
0.00 0.00 0.00 1,020.00 0.00 0.00 0.00 EMPLOYEE BENEFITS-OTHER01-400-4039
84.09 807.26 0.00 960.00 789.91 69.91 780.00 TELEPHONE01-400-5041
93.40 2,073.48 405.19 2,220.00 2,314.68 10.87 2,200.00 CELLULAR PHONE SERVICE01-400-5042
85.45 29,053.54 6,701.84 34,000.00 37,442.95 5,335.59 32,000.00 OUTSIDE MAINTENANCE SERVICE01-400-5048
99.92 7,823.70 0.00 7,830.00 7,459.00 0.00 7,500.00 DUES, MEMBERSHIP & SUBCRIPTION01-400-5091
88.99 2,049.47 193.13 2,303.00 2,021.25 551.25 2,205.00 PROF SERVICE-FINANCE01-400-5093
122.46 13,470.05 2,686.32 11,000.00 8,921.24 2,601.47 9,000.00 REPAIR/MAINT VEHICLES & EQUIP01-400-5178
18.41 184.14 0.00 1,000.00 3,119.92 0.00 2,000.00 SIGNS-TRAFFIC & STREETS01-400-5184
0.00 0.00 0.00 0.00 11,724.50 7,750.00 11,724.50 ENGINEERING SERVICES01-400-5322
231.33 2,313.27 0.00 1,000.00 739.20 0.00 3,000.00 EQUIPMENT RENTAL01-400-5346
13.47 26.93 2.79 200.00 15.37 0.00 200.00 OFFICE SUPPLIES01-400-6024
112.02 1,680.32 588.59 1,500.00 2,189.17 168.25 1,500.00 OTHER SUPPLIES01-400-6025
108.25 12,990.57 1,589.50 12,000.00 16,931.51 2,973.44 12,768.37 MAINT & CONSTRUCTION SUPPLIES01-400-6027
115.40 2,769.67 259.05 2,400.00 3,143.81 201.60 3,000.00 UNIFORMS01-400-6029
97.37 486.86 77.97 500.00 2,159.80 0.00 500.00 SAFETY EQUIPMENT01-400-6036
80.20 15,839.80 477.89 19,750.00 25,180.99 1,116.20 22,007.13 SNOW REMOVAL SUPPLIES01-400-6038
66.98 5,693.18 656.51 8,500.00 5,410.84 1,144.35 12,000.00 FUEL01-400-7002
19.80 99.00 0.00 500.00 189.22 0.00 1,000.00 RECRUITMENT & TRAINING01-400-7003
40.26 201.28 151.28 500.00 1,311.52 0.00 500.00 MISCELLANEOUS EXPENSE01-400-7005
28.78 143.92 0.00 500.00 1,540.76 0.00 1,250.00 MACHINERY & EQUIPMENT01-400-8002
100.53 2,211.64 0.00 2,200.00 1,986.45 437.35 1,661.00 COMPUTER SOFTWARE01-400-8003
0.00 0.00 0.00 0.00 2,000.00 0.00 0.00 STREET IMPROVEMENTS01-400-8006
100.39 32,860.01 2,929.84 32,733.00 28,127.12 3,076.59 37,964.00 REGULAR SALARIES01-500-4010
0.00 0.00 0.00 2,000.00 0.00 0.00 3,000.00 MERIT-VACATION BUY BACK01-500-4019
202.19 4,074.20 362.84 2,015.00 5,888.67 893.77 3,980.00 EMPLOYEE BENEFITS-MEDICAL01-500-4028
17.02 18.89 0.00 111.00 176.23 25.38 220.00 EMPLOYEE BENEFITS-DENTAL01-500-4029
117.36 2,382.32 126.29 2,030.00 2,101.06 217.59 2,904.00 FICA & MEDICARE EMPLOYER01-500-4031
36.94 243.08 21.67 658.00 541.78 57.77 763.00 IMRF EMPLOYER01-500-4032
0.00 0.00 0.00 0.00 8,659.03 0.00 0.00 PROFESSIONAL SERVICES01-500-5092
88.99 2,049.47 193.13 2,303.00 2,021.25 551.25 2,205.00 PROF SERVICE-FINANCE01-500-5093
96.25 44,156.00 0.00 45,877.00 51,485.15 0.00 52,968.00 WASTE DUMPING CHARGE01-500-5663
100.00 12,500.00 0.00 12,500.00 12,500.00 0.00 12,500.00 LEAF PICKUP01-500-5664
102.28 2,556.89 0.00 2,500.00 2,303.20 0.00 2,500.00 DUES & SUBSCRIPTIONS01-600-5091
150.65 8,436.25 935.00 5,600.00 8,406.25 786.25 5,100.00 PROFESSIONAL SERVICES01-600-5092
100.00 25,000.00 0.00 25,000.00 17,000.00 0.00 17,000.00 WINTER TREE TRIMMING01-600-5766
107.67 35,531.60 2,230.00 33,000.00 37,000.00 2,850.00 32,000.00 TREE REMOVAL & TRIMMING01-600-5767
59.73 10,525.00 10,525.00 17,620.00 16,857.26 0.00 11,300.00 TREE PLANTING PROGRAM01-600-5768
226.66 1,359.96 0.00 600.00 910.26 0.00 500.00 MAINT & CONSTRUCTION SUPPLIES01-600-6027
101.01 16,297.09 1,667.70 16,134.00 15,828.74 1,709.66 15,472.00 REGULAR SALARIES01-700-4010
125.93 629.64 242.75 500.00 364.73 56.58 500.00 OVERTIME SALARIES01-700-4011
0.00 0.00 0.00 0.00 0.00 0.00 150.00 MERIT-VACATION BUY BACK01-700-4019
85.57 3,981.49 713.85 4,653.00 3,737.23 674.92 4,366.00 EMPLOYEE BENEFITS-MEDICAL01-700-4028
79.97 215.11 38.83 269.00 215.13 38.83 268.00 EMPLOYEE BENEFITS-DENTAL01-700-4029
97.24 1,241.74 141.69 1,277.00 1,181.76 124.12 1,222.00 FICA & MEDICARE EMPLOYER01-700-4031
142
REVENUES AND EXPENDITURES BOOK AS OF 12/31/2025
MONTHLY REPORT OF FINANCIAL ACTIVITY BY FUND
REVENUE AND EXPENDITURE REPORT FOR VILLAGE OF KENILWORTH 4/14Page:01/14/2026 03:26 PM
User: JSCHMIDT
DB: Kenilworth
PERIOD ENDING 12/31/2025
% Fiscal Year Completed: 100.00
% BDGT
USED
YTD BALANCE
12/31/2025
ACTIVITY FOR
MONTH
12/31/25
2025
AMENDED BUDGET
YTD BALANCE
12/31/2024
ACTIVITY FOR
MONTH
12/31/24
2024
AMENDED BUDGETDESCRIPTIONGL NUMBER
Fund 01 - GENERAL FUND
37.32 125.39 14.16 336.00 313.88 33.72 321.00 IMRF EMPLOYER01-700-4032
33.78 2,735.10 1,823.40 8,096.00 5,700.00 0.00 6,500.00 OUTSIDE MAINTENANCE SERVICE01-700-5048
0.00 0.00 0.00 600.00 565.84 0.00 2,500.00 REPAIR/MAINT VEHICLES & EQUIP01-700-5178
101.90 2,343.69 0.00 2,300.00 3,860.77 2,186.84 3,500.00 OTHER SUPPLIES01-700-6025
62.40 7,487.77 1,631.80 12,000.00 11,753.17 1,626.35 8,000.00 HEATING, ELECT & WATER UTIL01-700-6028
88.67 332.50 38.34 375.00 311.33 65.42 800.00 FUEL01-700-7002
(163.03)(5,706.03)(2,139.00)3,500.00 1,843.71 0.00 3,350.00 CABLING, POSTS & LANTERNS01-700-8015
100.50 60,090.00 0.00 59,790.00 52,755.00 0.00 45,000.00 BEACH FEES01-800-3402
100.00 10,250.00 0.00 10,250.00 880.00 0.00 5,000.00 OTHER INCOME01-800-3989
100.00 35,149.85 0.00 35,150.00 44,209.75 0.00 38,000.00 PART TIME SALARIES01-800-4021
76.83 2,688.97 0.00 3,500.00 3,382.08 0.00 2,754.00 FICA & MEDICARE EMPLOYER01-800-4031
44.13 220.65 0.00 500.00 516.97 0.00 261.00 UNEMPLOYMENT EMPLOYER01-800-4033
121.50 971.99 0.00 800.00 908.98 0.00 733.00 PRINTING & PUBLISHING01-800-5036
51.84 673.93 0.00 1,300.00 867.34 74.98 780.00 TELEPHONE01-800-5041
100.50 603.00 0.00 600.00 602.20 0.00 700.00 MISCELLANEOUS SERVICES01-800-5051
69.33 832.00 0.00 1,200.00 1,177.20 0.00 890.00 LABORATORY SERVICES01-800-5054
96.28 2,406.90 0.00 2,500.00 2,303.20 0.00 2,500.00 DUES, MEMBERSHIPS & SUBSCRIPT01-800-5091
0.00 0.00 0.00 0.00 500.00 0.00 800.00 EQUIPMENT RENTAL01-800-5346
94.25 2,686.10 0.00 2,850.00 3,451.63 36.14 1,500.00 OTHER SUPPLIES01-800-6025
51.39 1,475.00 0.00 2,870.00 170.00 0.00 570.00 RECRUITMENT & TRAINING01-800-7003
57.91 115.82 0.00 200.00 81.67 0.00 735.00 MACHINERY & EQUIPMENT01-800-8002
197.76 1,384.29 71.96 700.00 7,622.22 0.00 3,800.00 FACILITY IMPROVE & ALTERATIONS01-800-8007
0.00 0.00 0.00 0.00 75,000.00 75,000.00 0.00 PROCEEDS FROM LEASE ISSUANCE01-900-4000
92.84 960,314.48 79,951.41 1,034,347.00 943,777.92 85,921.77 918,197.00 REGULAR SALARIES01-900-4010
101.70 50,852.07 6,566.92 50,000.00 54,907.34 7,948.51 45,000.00 OVERTIME SALARIES01-900-4011
100.00 4,150.00 750.00 0.00 5,185.71 2,185.71 0.00 MERIT-VACATION BUY BACK01-900-4019
100.70 68,476.21 5,270.92 68,000.00 114,088.89 8,373.10 140,242.00 PART TIME SALARIES01-900-4021
70.83 3,400.00 0.00 4,800.00 4,928.57 528.57 4,800.00 AUTO ALLOWANCE01-900-4023
99.51 222,682.38 37,371.46 223,781.00 214,574.32 37,646.52 210,808.00 EMPLOYEE BENEFITS-MEDICAL01-900-4028
105.74 12,393.01 2,287.20 11,720.00 11,316.58 2,035.43 11,719.00 EMPLOYEE BENEFITS-DENTAL01-900-4029
129.80 1,741.88 0.00 1,342.00 1,811.34 151.15 1,165.00 EMPLOYEE BENEFITS-LIFE01-900-4030
106.86 52,155.84 5,287.24 48,807.00 49,589.81 4,300.94 34,491.00 FICA & MEDICARE EMPLOYER01-900-4031
38.00 451.86 49.40 1,189.00 1,107.44 109.97 148.00 IMRF EMPLOYER01-900-4032
43.85 1,648.75 0.00 3,760.00 3,528.06 0.00 1,786.00 UNEMPLOYMENT EMPLOYER01-900-4033
109.71 34,250.10 3,850.53 31,220.00 27,252.16 2,373.39 20,405.00 DEF CONTRIB PLAN01-900-4035
58.09 441,376.15 0.00 759,873.00 834,908.74 (7,797.34)816,000.00 TRANSFER OF LEVY FUNDS-POLPEN01-900-4050
0.00 0.00 0.00 20,000.00 75,000.00 75,000.00 75,000.00 TRANS TO POLPEN-EXTRA01-900-4051
0.00 0.00 0.00 50.00 0.00 0.00 100.00 MAINT OF OFFICE EQUIPMENT01-900-5001
144.18 865.07 525.27 600.00 135.70 0.00 500.00 PRINTING AND PUBLISHING01-900-5036
121.93 2,560.47 0.00 2,100.00 1,893.00 158.16 2,100.00 TELEPHONE01-900-5041
152.93 4,282.12 810.34 2,800.00 2,343.71 431.34 3,816.00 CELLULAR PHONE SERVICE01-900-5042
29.06 465.00 0.00 1,600.00 489.00 0.00 1,500.00 OUTSIDE MAINTENANCE SERVICES01-900-5048
0.00 0.00 0.00 0.00 561.24 0.00 4,200.00 CRIMINAL JUSTICE CONNECTIVITY01-900-5053
51.28 3,840.00 0.00 7,488.00 7,080.00 624.00 5,800.00 RADIO SYSTEM AIR TIME01-900-5054
0.00 0.00 0.00 125.00 24.87 0.00 200.00 POSTAGE01-900-5071
110.43 44,962.31 486.34 40,716.00 26,212.58 503.18 26,000.00 DUES, MEMBERSHIPS &SUBSCRIPT01-900-5091
94.67 22,875.47 193.13 24,163.00 23,451.25 551.25 25,000.00 MUNICIPAL PARTNERSHIPS01-900-5093
100.00 226,177.00 0.00 226,177.00 217,480.00 0.00 217,478.00 PROFESSIONAL SERVICES-DISPATCH01-900-5095
323.48 646.95 0.00 200.00 135.00 0.00 500.00 REPAIR/MAINT COMPUTER EQUIP01-900-5177
91.18 9,610.31 1,186.25 10,540.00 10,874.95 226.48 10,000.00 REPAIR/MAINT VEHICLES & EQUIP01-900-5178
84.03 1,176.40 0.00 1,400.00 1,146.75 0.00 2,200.00 OFFICE SUPPLIES01-900-6024
76.58 3,982.41 1,612.40 5,200.00 4,066.86 30.34 6,500.00 OTHER SUPPLIES01-900-6025
85.99 10,318.40 1,304.85 12,000.00 12,085.03 1,487.50 9,000.00 UNIFORMS-PERSON PROTECT EQUIP01-900-6029
82.76 10,345.23 1,374.78 12,500.00 11,859.33 2,293.23 16,000.00 FUEL01-900-7002
107.25 21,155.82 3,676.00 19,725.00 16,773.15 4,351.00 11,000.00 RECRUITMENT & TRAINING01-900-7003
143
REVENUES AND EXPENDITURES BOOK AS OF 12/31/2025
MONTHLY REPORT OF FINANCIAL ACTIVITY BY FUND
REVENUE AND EXPENDITURE REPORT FOR VILLAGE OF KENILWORTH 5/14Page:01/14/2026 03:26 PM
User: JSCHMIDT
DB: Kenilworth
PERIOD ENDING 12/31/2025
% Fiscal Year Completed: 100.00
% BDGT
USED
YTD BALANCE
12/31/2025
ACTIVITY FOR
MONTH
12/31/25
2025
AMENDED BUDGET
YTD BALANCE
12/31/2024
ACTIVITY FOR
MONTH
12/31/24
2024
AMENDED BUDGETDESCRIPTIONGL NUMBER
Fund 01 - GENERAL FUND
89.96 2,473.99 158.11 2,750.00 3,225.95 0.00 3,500.00 COMMUNITY SERVICE01-900-7004
70.60 353.00 0.00 500.00 170.22 0.00 750.00 MISCELLANEOUS EXPENSE01-900-7005
100.13 500.66 0.00 500.00 215.52 0.00 500.00 MEETINGS & CONFERENCES01-900-7006
0.00 0.00 0.00 300.00 299.54 0.00 500.00 OFFICE FURNITURE01-900-8001
106.19 8,919.76 0.00 8,400.00 75,000.00 75,000.00 500.00 MACHINERY & EQUIPMENT01-900-8002
143.81 5,033.19 0.00 3,500.00 3,437.20 1,748.97 3,437.00 SOFTWARE01-900-8003
0.00 0.00 0.00 1,250.00 0.00 0.00 300.00 COMPUTER EQUIPMENT01-900-8004
87.80 11,212.25 0.00 12,770.00 12,949.79 1,421.41 13,811.00 REGULAR SALARIES01-950-4010
28.31 873.25 0.00 3,085.00 669.86 149.13 2,895.00 EMPLOYEE BENEFITS-MEDICAL01-950-4028
(0.64)(1.03)0.00 162.00 246.68 (1.95)162.00 EMPLOYEE BENEFITS-DENTAL01-950-4029
78.06 145.19 0.00 186.00 162.29 16.76 201.00 MEDICARE01-950-4031
95.99 1,727.85 365.60 1,800.00 1,509.94 739.13 1,800.00 MISCELLANEOUS SERVICES01-950-5051
100.00 479,157.83 0.00 479,158.00 467,471.05 0.00 467,472.00 FIRE PROTECTION01-950-5156
0.00 0.00 0.00 0.00 33,333.33 0.00 5,000.00 FOREIGN FIRE EXPENSES01-950-8002
204.71 (2,129,996.25)(301,894.37)(1,040,494.00)1,670,890.89 63,983.35 223,357.00 NET OF REVENUES & EXPENDITURES
93.07 6,759,768.72 348,889.09 7,262,991.00 5,156,495.28 491,662.10 4,968,788.00 TOTAL EXPENDITURES
74.40 4,629,772.47 46,994.72 6,222,497.00 6,827,386.17 555,645.45 5,192,145.00 TOTAL REVENUES
Fund 01 - GENERAL FUND:
144
REVENUES AND EXPENDITURES BOOK AS OF 12/31/2025
MONTHLY REPORT OF FINANCIAL ACTIVITY BY FUND
REVENUE AND EXPENDITURE REPORT FOR VILLAGE OF KENILWORTH 6/14Page:01/14/2026 03:26 PM
User: JSCHMIDT
DB: Kenilworth
PERIOD ENDING 12/31/2025
% Fiscal Year Completed: 100.00
% BDGT
USED
YTD BALANCE
12/31/2025
ACTIVITY FOR
MONTH
12/31/25
2025
AMENDED BUDGET
YTD BALANCE
12/31/2024
ACTIVITY FOR
MONTH
12/31/24
2024
AMENDED BUDGETDESCRIPTIONGL NUMBER
Fund 02 - SEWER SERVICE FUND
100.83 114,975.29 8,654.94 114,033.00 105,128.47 8,302.76 101,200.00 SEWER CHARGES02-100-3430
103.14 18,565.33 0.00 18,000.00 25,789.60 2,130.61 18,000.00 INTEREST INCOME02-100-3701
0.00 0.00 0.00 0.00 100.00 0.00 0.00 OTHER INCOME02-100-3989
101.01 42,372.18 4,335.71 41,950.00 41,154.42 4,445.43 40,226.00 REGULAR SALARIES02-100-4010
100.00 1,637.12 631.19 0.00 948.25 147.16 0.00 OVERTIME SALARIES02-100-4011
0.00 0.00 0.00 0.00 0.00 0.00 390.00 MERIT-VACATION BUY BACK02-100-4019
76.69 9,277.62 1,856.09 12,098.00 9,663.30 1,748.45 11,351.00 EMPLOYEE BENEFITS-MEDICAL02-100-4028
93.63 559.00 100.92 597.00 558.98 100.89 597.00 EMPLOYEE BENEFITS-DENTAL02-100-4029
0.00 0.00 0.00 54.00 0.00 0.00 50.00 EMPLOYEE BENEFITS-LIFE02-100-4030
100.29 3,228.22 368.43 3,219.00 3,072.34 322.71 3,077.00 FICA & MEDICARE-EMPLOYER02-100-4031
38.49 325.66 36.75 846.00 816.07 87.66 809.00 IMRF-EMPLOYER02-100-4032
43.85 45.17 0.00 103.00 97.16 0.00 49.00 UNEMPLOYMENT-EMPLOYER02-100-4033
117.55 14,065.00 2,100.00 11,965.00 13,408.92 102.50 35,000.00 OUTSIDE MAINTENANCE SERVICES02-100-5048
96.28 2,406.90 0.00 2,500.00 2,303.20 0.00 2,500.00 DUES, MEMBERSHIPS & SUBSCRIPT02-100-5091
95.47 1,336.52 0.00 1,400.00 180.49 0.00 0.00 REPAIR/MAINT VEHICLES & EQUIP02-100-5178
24.90 1,145.32 0.00 4,600.00 5,451.89 0.00 3,000.00 MAINT & CONSTRUCTION SUPPLIES02-100-6027
0.00 0.00 0.00 0.00 0.00 0.00 750.00 PERMIT FEE02-100-7050
94.96 5,104.08 0.00 5,375.00 4,865.93 218.63 4,627.00 SOFTWARE02-100-8003
84.61 10,152.86 0.00 12,000.00 11,025.07 0.00 10,000.00 SEWER REPAIRS02-100-8012
118.57 41,884.97 (774.15)35,326.00 37,472.05 3,259.94 6,774.00 NET OF REVENUES & EXPENDITURES
94.78 91,655.65 9,429.09 96,707.00 93,546.02 7,173.43 112,426.00 TOTAL EXPENDITURES
101.14 133,540.62 8,654.94 132,033.00 131,018.07 10,433.37 119,200.00 TOTAL REVENUES
Fund 02 - SEWER SERVICE FUND:
145
REVENUES AND EXPENDITURES BOOK AS OF 12/31/2025
MONTHLY REPORT OF FINANCIAL ACTIVITY BY FUND
REVENUE AND EXPENDITURE REPORT FOR VILLAGE OF KENILWORTH 7/14Page:01/14/2026 03:26 PM
User: JSCHMIDT
DB: Kenilworth
PERIOD ENDING 12/31/2025
% Fiscal Year Completed: 100.00
% BDGT
USED
YTD BALANCE
12/31/2025
ACTIVITY FOR
MONTH
12/31/25
2025
AMENDED BUDGET
YTD BALANCE
12/31/2024
ACTIVITY FOR
MONTH
12/31/24
2024
AMENDED BUDGETDESCRIPTIONGL NUMBER
Fund 06 - MFT FUND
90.65 34,900.01 0.00 38,500.00 36,064.58 2,905.33 18,000.00 INTEREST INCOME06-100-3701
97.39 104,223.27 0.00 107,011.00 111,747.68 9,782.45 109,850.00 MFT ALLOTMENTS06-100-3801
100.00 229,642.55 229,642.55 229,642.00 0.00 0.00 0.00 ROAD PROJECTS06-100-8007
107.59 (90,519.27)(229,642.55)(84,131.00)147,812.26 12,687.78 127,850.00 NET OF REVENUES & EXPENDITURES
100.00 229,642.55 229,642.55 229,642.00 0.00 0.00 0.00 TOTAL EXPENDITURES
95.61 139,123.28 0.00 145,511.00 147,812.26 12,687.78 127,850.00 TOTAL REVENUES
Fund 06 - MFT FUND:
146
REVENUES AND EXPENDITURES BOOK AS OF 12/31/2025
MONTHLY REPORT OF FINANCIAL ACTIVITY BY FUND
REVENUE AND EXPENDITURE REPORT FOR VILLAGE OF KENILWORTH 8/14Page:01/14/2026 03:26 PM
User: JSCHMIDT
DB: Kenilworth
PERIOD ENDING 12/31/2025
% Fiscal Year Completed: 100.00
% BDGT
USED
YTD BALANCE
12/31/2025
ACTIVITY FOR
MONTH
12/31/25
2025
AMENDED BUDGET
YTD BALANCE
12/31/2024
ACTIVITY FOR
MONTH
12/31/24
2024
AMENDED BUDGETDESCRIPTIONGL NUMBER
Fund 14 - TAX INCREMENT FINANCING
86.38 172,763.74 0.00 200,000.00 309,007.20 (9,216.61)90,000.00 CURRENT TAX LEVY14-100-3001
112.34 67,401.48 0.00 60,000.00 59,290.50 7,654.73 13,500.00 INTEREST INCOME14-100-3701
0.00 0.00 0.00 0.00 800,000.00 0.00 800,000.00 FUND TRANSFER IN14-100-3992
8.32 832.00 78.00 10,000.00 0.00 0.00 0.00 VILLAGE ATTORNEY-BASE14-100-5024
0.00 0.00 0.00 0.00 18,500.00 0.00 0.00 PROFESSIONAL SERVICES14-100-5092
0.00 0.00 0.00 2,500.00 21,449.73 8,149.73 40,000.00 PROF SERVICES-PLANNING14-100-5096
284.60 56,919.75 0.00 20,000.00 51,354.00 35,029.50 100,000.00 ENGINEERING SERVICES14-100-5322
0.00 0.00 0.00 300.00 0.00 0.00 0.00 MAINT & CONSTRUCTION SUPPLIES14-100-6027
91.14 13,670.50 0.00 15,000.00 0.00 0.00 0.00 STREET IMPROVEMENTS14-100-8006
0.00 0.00 0.00 0.00 0.00 0.00 700,000.00 SEWER REPAIRS14-100-8012
0.00 0.00 0.00 15,000.00 0.00 0.00 45,000.00 FAÇADE IMPROVEMENT GRANT14-100-8102
85.57 168,742.97 (78.00)197,200.00 1,076,993.97 (44,741.11)18,500.00 NET OF REVENUES & EXPENDITURES
113.73 71,422.25 78.00 62,800.00 91,303.73 43,179.23 885,000.00 TOTAL EXPENDITURES
92.37 240,165.22 0.00 260,000.00 1,168,297.70 (1,561.88)903,500.00 TOTAL REVENUES
Fund 14 - TAX INCREMENT FINANCING:
147
REVENUES AND EXPENDITURES BOOK AS OF 12/31/2025
MONTHLY REPORT OF FINANCIAL ACTIVITY BY FUND
REVENUE AND EXPENDITURE REPORT FOR VILLAGE OF KENILWORTH 9/14Page:01/14/2026 03:26 PM
User: JSCHMIDT
DB: Kenilworth
PERIOD ENDING 12/31/2025
% Fiscal Year Completed: 100.00
% BDGT
USED
YTD BALANCE
12/31/2025
ACTIVITY FOR
MONTH
12/31/25
2025
AMENDED BUDGET
YTD BALANCE
12/31/2024
ACTIVITY FOR
MONTH
12/31/24
2024
AMENDED BUDGETDESCRIPTIONGL NUMBER
Fund 23 - KW 2023 CAPTIAL PROJECTS FUND
78.61 33,800.85 0.00 43,000.00 86,585.58 4,191.80 75,000.00 INTEREST INCOME23-100-3701
0.00 0.00 0.00 (9,199.00)12,000.00 12,000.00 0.00 OTHER INCOME23-100-3989
0.00 0.00 0.00 0.00 150.00 0.00 250.00 PRINTING & PUBLISHING23-100-5036
0.00 0.00 0.00 0.00 56,254.05 (155,578.88)0.00 PROFESSIONAL SERVICES23-100-5092
97.89 1,174,712.00 0.00 1,200,000.00 800,000.00 0.00 800,000.00 FUNDS TRANSFER OUT23-100-7395
0.00 0.00 0.00 (25,288.00)0.00 0.00 0.00 TRANSFER-CAPITAL ITEM23-100-7396
100.00 (34.00)0.00 0.00 0.00 0.00 0.00 MISCELLANEOUS EXPENSE23-400-7005
0.00 0.00 0.00 0.00 10,770.96 670.00 12,000.00 STREET IMPROVEMENTS23-400-8006
0.00 0.00 0.00 0.00 0.00 0.00 50,000.00 ENGINEERING-WATER23-935-5322
0.00 0.00 0.00 0.00 0.00 0.00 1,200,000.00 ROAD PROJECTS23-935-8008
0.00 0.00 0.00 0.00 2,750.00 0.00 0.00 STORM SEWER IMPROVEMENTS23-992-8014
100.00 (1,140,877.15)0.00 (1,140,911.00)(771,339.43)171,100.68 (1,987,250.00)NET OF REVENUES & EXPENDITURES
100.00 1,174,678.00 0.00 1,174,712.00 869,925.01 (154,908.88)2,062,250.00 TOTAL EXPENDITURES
100.00 33,800.85 0.00 33,801.00 98,585.58 16,191.80 75,000.00 TOTAL REVENUES
Fund 23 - KW 2023 CAPTIAL PROJECTS FUND:
148
REVENUES AND EXPENDITURES BOOK AS OF 12/31/2025
MONTHLY REPORT OF FINANCIAL ACTIVITY BY FUND
REVENUE AND EXPENDITURE REPORT FOR VILLAGE OF KENILWORTH 10/14Page:01/14/2026 03:26 PM
User: JSCHMIDT
DB: Kenilworth
PERIOD ENDING 12/31/2025
% Fiscal Year Completed: 100.00
% BDGT
USED
YTD BALANCE
12/31/2025
ACTIVITY FOR
MONTH
12/31/25
2025
AMENDED BUDGET
YTD BALANCE
12/31/2024
ACTIVITY FOR
MONTH
12/31/24
2024
AMENDED BUDGETDESCRIPTIONGL NUMBER
Fund 26 - LONG-TERM DEBT SERVICE
49.47 494,344.74 0.00 999,282.00 1,024,301.17 (45,173.31)1,010,000.00 PROPERTY TAX-ANNUAL CAP BOND26-100-3003
49.69 392,550.30 0.00 790,000.00 707,700.99 (33,620.17)689,200.00 PROPERTY TAX-2023 CAP BOND26-100-3004
0.00 0.00 0.00 600,000.00 6,131,406.54 5,613,045.35 6,131,406.54 BOND PROCEEDS26-100-3100
0.00 0.00 0.00 20,000.00 21,794.85 0.00 21,794.85 BOND PREMIUM26-100-3101
120.18 24,036.44 0.00 20,000.00 48,148.29 455.60 30,000.00 INTEREST26-100-3701
208.19 3,122.92 0.00 1,500.00 7,592.50 0.00 7,142.50 ADMINISTRATIVE BOND EXPENSES26-100-5026
0.00 0.00 0.00 0.00 11,324.05 0.00 11,324.05 COST OF ISSUANCE26-100-5032
0.00 0.00 0.00 0.00 5,605,000.00 5,605,000.00 0.00 PAYMENT TO ESCROW AGENT26-100-7300
100.00 935,000.00 0.00 935,000.00 955,000.00 0.00 960,000.00 PRINC - ANNUAL CAPITAL BOND26-100-7302
0.00 0.00 0.00 0.00 0.00 0.00 5,605,000.00 PRINCIPAL-SERIES 2013 CAPITAL26-100-7303
100.00 390,000.00 0.00 390,000.00 375,000.00 0.00 375,000.00 PRINCIPAL - SERIES 202326-100-7304
95.65 440,000.00 0.00 460,000.00 465,000.00 0.00 465,000.00 PRINCIPAL - SERIES 2024A26-100-7306
100.00 64,281.25 0.00 64,282.00 42,615.55 0.00 38,000.00 INTEREST-ANNUAL CAPITAL BOND26-100-7312
0.00 0.00 0.00 0.00 120,145.35 8,045.35 336,300.00 INTEREST-SERIES 2013 CAP BOND26-100-7313
100.00 210,400.00 0.00 210,400.00 225,400.00 0.00 225,400.00 INTEREST- SERIES 202326-100-7314
100.00 350,000.00 0.00 350,000.00 139,968.75 0.00 139,968.75 INTEREST - SERIES 2024A26-100-7316
0.00 0.00 0.00 0.00 0.00 0.00 390,000.00 FUND TRANSFER OUT26-100-7395
8,187.14 (1,481,872.69)0.00 18,100.00 (13,694.36)(78,337.88)(670,733.91)NET OF REVENUES & EXPENDITURES
99.24 2,392,804.17 0.00 2,411,182.00 7,947,046.20 5,613,045.35 8,553,135.30 TOTAL EXPENDITURES
37.50 910,931.48 0.00 2,429,282.00 7,933,351.84 5,534,707.47 7,882,401.39 TOTAL REVENUES
Fund 26 - LONG-TERM DEBT SERVICE:
149
REVENUES AND EXPENDITURES BOOK AS OF 12/31/2025
MONTHLY REPORT OF FINANCIAL ACTIVITY BY FUND
REVENUE AND EXPENDITURE REPORT FOR VILLAGE OF KENILWORTH 11/14Page:01/14/2026 03:26 PM
User: JSCHMIDT
DB: Kenilworth
PERIOD ENDING 12/31/2025
% Fiscal Year Completed: 100.00
% BDGT
USED
YTD BALANCE
12/31/2025
ACTIVITY FOR
MONTH
12/31/25
2025
AMENDED BUDGET
YTD BALANCE
12/31/2024
ACTIVITY FOR
MONTH
12/31/24
2024
AMENDED BUDGETDESCRIPTIONGL NUMBER
Fund 27 - ANNUAL REFUNDING BOND
0.00 0.00 0.00 390,000.00 458,150.00 0.00 360,000.00 BOND PROCEEDS27-100-3100
90.55 181,107.70 0.00 200,000.00 280,278.44 24,445.83 89,000.00 INTEREST27-100-3701
0.00 0.00 0.00 0.00 0.00 0.00 10,000.00 OTHER INCOME27-100-3989
0.00 0.00 0.00 0.00 0.00 0.00 7,700.00 ADMINISTRATIVE BOND EXPENSES27-100-5029
100.00 3,400,000.00 0.00 3,400,000.00 0.00 0.00 0.00 TRANSFER OF FUNDS (OUT)27-100-7395
0.00 0.00 0.00 0.00 0.00 0.00 3,000.00 SOFTWARE27-100-8003
127.81 12,781.33 0.00 10,000.00 1,206.93 0.00 2,300.00 COMPUTER EQUIPMENT27-100-8004
0.00 0.00 0.00 0.00 0.00 0.00 7,000.00 OUTSIDE MAINTENANCE27-300-5048
92.56 42,578.44 0.00 46,000.00 78,478.17 11,888.00 75,300.00 BLG IMPROVEMENTS & ALTERATIONS27-300-8007
0.00 0.00 0.00 5,000.00 0.00 0.00 0.00 OUTSIDE SERVICE-ROAD STRIPE27-400-5048
0.00 0.00 0.00 0.00 1,381.95 0.00 0.00 STREET SIGNS27-400-5184
0.00 0.00 0.00 0.00 7,215.00 0.00 0.00 ENGINEERING SERV.-PUBLIC WORKS27-400-5322
0.00 0.00 0.00 0.00 6,038.00 0.00 7,000.00 EQUIPMENT-STREET DEPT27-400-8002
111.49 5,574.50 0.00 5,000.00 5,797.21 0.00 8,000.00 STREET IMPROVEMENTS27-400-8006
100.00 27,000.00 0.00 27,000.00 18,312.50 0.00 26,000.00 SIDEWALK PROG - ANNUAL 27-400-8007
73.73 8,848.11 0.00 12,000.00 137,401.99 4,493.23 125,000.00 ROAD PROJECTS27-400-8008
77.93 7,792.78 5,250.00 10,000.00 0.00 0.00 0.00 STORM WATER IMPROVEMENTS27-400-8010
72.97 32,106.00 (2,139.00)44,000.00 26,366.00 8,271.00 31,210.00 CABLING, POSTS, LANTERNS27-700-8015
0.00 0.00 0.00 0.00 40,363.46 0.00 37,845.00 MACHINERY & EQUIPMENT27-900-8002
100.00 3,562.82 0.00 0.00 0.00 0.00 0.00 COMPUTER EQUIPMENT27-900-8004
0.00 0.00 0.00 0.00 13,695.08 0.00 0.00 PROFESSIONAL SERVICES27-935-5092
0.00 0.00 0.00 0.00 0.00 0.00 3,000.00 MACHINERY & EQUIPMENT27-935-8002
113.14 (3,359,136.28)(3,111.00)(2,969,000.00)402,172.15 (206.40)125,645.00 NET OF REVENUES & EXPENDITURES
99.47 3,540,243.98 3,111.00 3,559,000.00 336,256.29 24,652.23 333,355.00 TOTAL EXPENDITURES
30.70 181,107.70 0.00 590,000.00 738,428.44 24,445.83 459,000.00 TOTAL REVENUES
Fund 27 - ANNUAL REFUNDING BOND:
150
REVENUES AND EXPENDITURES BOOK AS OF 12/31/2025
MONTHLY REPORT OF FINANCIAL ACTIVITY BY FUND
REVENUE AND EXPENDITURE REPORT FOR VILLAGE OF KENILWORTH 12/14Page:01/14/2026 03:26 PM
User: JSCHMIDT
DB: Kenilworth
PERIOD ENDING 12/31/2025
% Fiscal Year Completed: 100.00
% BDGT
USED
YTD BALANCE
12/31/2025
ACTIVITY FOR
MONTH
12/31/25
2025
AMENDED BUDGET
YTD BALANCE
12/31/2024
ACTIVITY FOR
MONTH
12/31/24
2024
AMENDED BUDGETDESCRIPTIONGL NUMBER
Fund 28 - 2024A BOND/LAKE FRONT PROJECTS
0.00 0.00 0.00 0.00 1,810,443.46 0.00 1,810,443.46 BOND PROCEEDS28-100-3100
0.00 0.00 0.00 0.00 786,972.65 0.00 786,972.65 BOND PREMIUM28-100-3106
186.89 93,447.21 0.00 50,000.00 52,301.20 9,286.44 15,000.00 INTEREST INCOME28-100-3701
100.00 946,904.33 400,000.00 0.00 0.00 0.00 10,000.00 GIFTS & CONTRIBUTIONS28-100-3903
100.00 350,000.00 0.00 350,000.00 0.00 0.00 0.00 FUNDS TRANSFER IN28-100-3990
100.00 6,474,712.00 0.00 6,474,712.00 0.00 0.00 0.00 FUND TRANSFER IN28-100-3992
162.93 4,888.00 442.00 3,000.00 0.00 0.00 0.00 ATTORNEY FEES28-100-5024
0.00 0.00 0.00 0.00 84,775.95 0.00 84,775.95 COST OF ISSUANCE28-100-5032
0.00 0.00 0.00 0.00 9,331.25 0.00 9,331.25 ADMIN BOND EXPENSES28-100-5034
44.90 1,346.97 0.00 3,000.00 0.00 0.00 0.00 PRINTING AND PUBLISHING28-100-5036
0.00 0.00 0.00 300.00 0.00 0.00 0.00 POSTAGE28-100-5071
103.41 579,157.60 116,221.95 560,050.00 340,715.98 180,708.06 77,550.00 PROFESSIONAL SERVICES28-100-5092
0.00 0.00 0.00 4,000.00 0.00 0.00 0.00 OTHER SUPPLIES28-100-6025
43.38 2,158,189.17 774,258.29 4,974,575.00 485,519.59 477,519.22 2,442,759.21 BUILDING IMPROVEMENTS & ALTERATIONS28-100-8007
385.14 5,121,481.80 (490,922.24)1,329,787.00 1,729,374.54 (648,940.84)7,999.70 NET OF REVENUES & EXPENDITURES
49.48 2,743,581.74 890,922.24 5,544,925.00 920,342.77 658,227.28 2,614,416.41 TOTAL EXPENDITURES
114.41 7,865,063.54 400,000.00 6,874,712.00 2,649,717.31 9,286.44 2,622,416.11 TOTAL REVENUES
Fund 28 - 2024A BOND/LAKE FRONT PROJECTS:
151
REVENUES AND EXPENDITURES BOOK AS OF 12/31/2025
MONTHLY REPORT OF FINANCIAL ACTIVITY BY FUND
REVENUE AND EXPENDITURE REPORT FOR VILLAGE OF KENILWORTH 13/14Page:01/14/2026 03:26 PM
User: JSCHMIDT
DB: Kenilworth
PERIOD ENDING 12/31/2025
% Fiscal Year Completed: 100.00
% BDGT
USED
YTD BALANCE
12/31/2025
ACTIVITY FOR
MONTH
12/31/25
2025
AMENDED BUDGET
YTD BALANCE
12/31/2024
ACTIVITY FOR
MONTH
12/31/24
2024
AMENDED BUDGETDESCRIPTIONGL NUMBER
Fund 35 - WATER FUND
91.67 3,300.00 0.00 3,600.00 3,500.00 300.00 3,600.00 MAINTENANCE FEE35-100-3420
100.81 856,010.23 67,547.71 849,108.00 778,238.59 65,739.79 740,000.00 WATER SERVICE-METERED35-100-3432
100.48 277,880.09 24,798.81 276,547.00 277,232.16 24,608.95 270,000.00 WATER IMPROVEMENT CHARGE35-100-3435
104.09 31,018.11 0.00 29,800.00 39,128.32 4,072.28 16,500.00 INTEREST INCOME35-100-3701
129.22 4,135.00 0.00 3,200.00 4,550.00 0.00 3,000.00 SALE OF WATER METERS35-100-3902
89.45 738.00 12.00 825.00 668.00 2.00 800.00 BACKFLOW TESTING REBATE35-100-3903
0.00 0.00 0.00 0.00 598.51 91.90 0.00 OTHER INCOME35-100-3904
100.48 180,296.17 17,067.10 179,428.00 162,619.65 14,675.87 188,368.00 REGULAR SALARIES35-100-4010
157.41 3,148.22 1,213.79 2,000.00 1,823.63 283.02 2,000.00 OVER TIME SALARIES35-100-4011
0.00 0.00 0.00 6,000.00 0.00 0.00 8,250.00 MERIT-VACATION BUY BACK35-100-4019
117.18 26,912.16 4,845.19 22,967.00 28,014.17 3,010.69 32,722.00 EMPLOYEE BENEFITS-MEDICAL35-100-4028
74.24 1,242.05 214.35 1,673.00 1,640.93 280.51 1,946.00 EMPLOYEE BENEFITS-DENTAL35-100-4029
49.84 113.64 0.00 228.00 135.78 10.70 217.00 EMPLOYEE BENEFITS-LIFE35-100-4030
96.62 13,410.48 1,129.78 13,880.00 12,364.22 1,266.70 14,563.00 FICA & MEDICARE EMPLOYER35-100-4031
37.22 1,357.37 135.28 3,647.00 3,479.43 582.40 3,827.00 IMRF EMPLOYER35-100-4032
44.05 352.40 0.00 800.00 779.23 0.00 407.00 UNEMPLOYMENT EMPLOYER35-100-4033
99.97 542.85 0.00 543.00 721.10 0.00 1,500.00 JULIE FEES35-100-5022
92.50 740.00 225.00 800.00 864.40 0.00 840.00 PRINTING & PUBLISHING35-100-5036
103.44 905.11 0.00 875.00 867.34 74.98 1,160.00 TELEPHONE35-100-5041
35.93 913.96 141.42 2,544.00 2,110.96 214.14 846.00 CELLULAR TELEPHONE SERVICE35-100-5042
149.73 12,577.20 2,417.10 8,400.00 7,990.25 0.00 6,900.00 OUTSIDE MAINTENANCE SERVICE35-100-5048
0.00 0.00 0.00 500.00 0.00 0.00 500.00 EQUIPMENT MAINTENANCE35-100-5049
0.00 0.00 0.00 0.00 0.00 0.00 75.00 MISCELLANEOUS SERVICES35-100-5051
142.48 2,670.00 690.00 1,874.00 1,788.80 69.00 1,828.00 LABORATORY SERVICES35-100-5054
100.00 1,754.00 61.00 0.00 1,609.00 280.00 1,750.00 POSTAGE35-100-5071
102.99 8,975.70 0.00 8,715.00 8,504.60 680.00 7,500.00 DUES,MEMBERSHIPS & SUBSCRIPT35-100-5091
100.00 19,445.45 0.00 19,445.00 31,853.60 865.00 17,350.00 PROFESSIONAL SERVICES35-100-5092
88.99 20,493.75 1,931.25 23,028.00 20,212.50 5,512.50 22,050.00 PROF SERVICE-FINANCE35-100-5093
91.90 12,636.86 2,311.91 13,750.00 13,121.94 2,182.34 13,550.00 PROFESSIONAL SERVICES-IT35-100-5100
0.00 0.00 0.00 0.00 0.00 0.00 1,250.00 REPAIR/MAINT COMPUTER EQUIP35-100-5177
175.74 6,502.48 0.00 3,700.00 3,385.00 0.00 1,550.00 REPAIR/MAINT VEHICLES & EQUIP35-100-5178
115.60 351,366.98 38,048.64 303,954.00 255,305.54 25,979.03 240,000.00 PURCHASE OF POTABLE WATER35-100-5400
0.00 0.00 0.00 0.00 4.48 4.48 400.00 OTHER SUPPLIES35-100-6025
81.86 1,023.23 0.00 1,250.00 1,096.27 581.40 1,750.00 MAINT & CONSTRUCTION SUPPLIES35-100-6027
86.36 15,290.36 2,503.50 17,706.00 11,963.69 2,062.00 15,000.00 HEATING, ELECT & WATER UTIL35-100-6028
0.00 0.00 0.00 0.00 692.52 150.94 576.00 UNIFORMS35-100-6029
117.65 7,058.76 0.00 6,000.00 1,841.20 0.00 9,500.00 METER SUPPLIES35-100-6033
0.00 0.00 0.00 0.00 0.00 0.00 500.00 VALVE MAINTENANCE35-100-6034
0.00 0.00 0.00 0.00 0.00 0.00 425.00 TOOLS35-100-6037
49.63 2,084.28 240.35 4,200.00 1,951.56 410.05 4,750.00 FUEL35-100-7002
35.33 530.00 0.00 1,500.00 50.00 0.00 2,500.00 RECRUITMENT & TRAINING35-100-7003
0.00 0.00 0.00 0.00 0.00 0.00 220,000.00 BOND PRINCIPAL PAYMENT35-100-7301
100.00 44,100.00 0.00 44,100.00 50,700.00 0.00 50,700.00 BOND INTEREST35-100-7311
0.00 0.00 0.00 0.00 408,747.05 408,747.05 0.00 DEPRECIATION35-100-7399
124.13 37,212.71 7,222.00 29,979.00 16,651.83 1,093.11 12,195.00 SOFTWARE35-100-8003
43.60 109.00 0.00 250.00 5,212.76 0.00 800.00 COMPUTER EQUIPMENT35-100-8004
107.57 1,613.55 0.00 1,500.00 2,407.36 1,287.43 4,950.00 BULDING & GROUNDS35-100-8007
0.00 0.00 0.00 0.00 0.00 0.00 8,000.00 CAPITAL OUTLAY35-100-8008
99.41 85,741.09 0.00 86,254.00 50,547.42 7,139.69 45,000.00 WATER MAIN REPAIRS35-100-8009
120.32 7,219.39 2,642.62 6,000.00 7,212.87 0.00 10,500.00 WATER METER REPLACEMENTS35-100-8011
Fund 35 - WATER FUND:
152
REVENUES AND EXPENDITURES BOOK AS OF 12/31/2025
MONTHLY REPORT OF FINANCIAL ACTIVITY BY FUND
REVENUE AND EXPENDITURE REPORT FOR VILLAGE OF KENILWORTH 14/14Page:01/14/2026 03:26 PM
User: JSCHMIDT
DB: Kenilworth
PERIOD ENDING 12/31/2025
% Fiscal Year Completed: 100.00
% BDGT
USED
YTD BALANCE
12/31/2025
ACTIVITY FOR
MONTH
12/31/25
2025
AMENDED BUDGET
YTD BALANCE
12/31/2024
ACTIVITY FOR
MONTH
12/31/24
2024
AMENDED BUDGETDESCRIPTIONGL NUMBER
Fund 35 - WATER FUND
88.18 304,742.23 9,318.24 345,590.00 (14,355.50)(382,628.11)75,405.00 NET OF REVENUES & EXPENDITURES
106.22 868,339.20 83,040.28 817,490.00 1,118,271.08 477,443.03 958,495.00 TOTAL EXPENDITURES
100.86 1,173,081.43 92,358.52 1,163,080.00 1,103,915.58 94,814.92 1,033,900.00 TOTAL REVENUES
77.54 (2,565,549.67)(1,017,104.07)(3,308,533.00)4,265,326.57 (903,822.59)(2,072,453.21)NET OF REVENUES & EXPENDITURES
84.46 17,872,136.26 1,565,112.25 21,159,449.00 16,533,186.38 7,160,473.77 20,487,865.71 TOTAL EXPENDITURES - ALL FUNDS
85.75 15,306,586.59 548,008.18 17,850,916.00 20,798,512.95 6,256,651.18 18,415,412.50 TOTAL REVENUES - ALL FUNDS
153
Monthly Report
TO: Tim Ransford, Public Safety Committee Chair
Village Board of Trustees
FROM: Don Silva, Chief of Police
DATE: January 20, 2026
SUBJECT: Activity Report for December 2025
Kenilworth Police Department Page 1 of 2
Overview of the December priorities, accomplishments, and emerging issues.
In December, the Kenilworth Police Department continued to focus on traffic safety in the school
area and vacation watch house checks. Community engagement remained a priority: meeting the
Boy Scouts during their use of the police department firearms range, emergency preparedness
planning with the Joseph Sears School staff, and providing a presence at the Christmas tree lighting
and Menorah lighting events. There were no significant criminal activities or emerging issues that
negatively impacted the Village. One crime was reported during this period, Deceptive Practice.
Activity Snapshot
There were 1,103 Calls for Service (CFS) in the month of December. CFS have historically included
“drive-by” premise checks. These types of premise checks account for about 20% of all CFS and will
no longer be counted toward actual calls for service effective January 2026.
Overall service demand remained stable month to month, with a slight decrease in calls for service in
December. Traffic activity declined, reflecting fewer stops and enforcement actions due to school
being out of session, while parking activity increased. Community service activity increased; vacation
watches increased by 26% reflecting our commitment to meeting the seasonal demand.
154
Kenilworth Police Department Page 2 of 2
Community Engagement
KPD connection opportunity with residents, the Joseph Sears School, and other stakeholders:
• Interaction with the Boy Scouts on December 1st when they visited the KPD to use the
firearms range.
• Attended networking event hosted by the Kenilworth Park District on December 15th, where
members of the Village Staff, Public Works, Park District, and community members gathered
for a holiday luncheon.
• Participated in the monthly emergency preparedness meeting at the Joseph Sears School on
December 10th.
• Provided traffic control and community support at the Christmas tree lighting and Menorah
lighting on December 6th and December 14th respectively.
These interactions help reinforce the trust and partnership the Kenilworth Police Department has
with internal stakeholders and the community. Our interactions and collaboration in planning with
the school aid in crisis prevention and preparedness.
Officer Development and Training
KPD investments in professional development:
• This month, a KPD officer was enrolled in the Northwestern University Center of Public Safety
Supervision of Police Personnel course. He is scheduled to attend the course in May 2026.
• All but one P/T officer completed training on anti-harassment in the workplace and
cybersecurity.
The officer enrolled in the supervisory course has served at the KPD for over 17 years; he took the
sergeant promotional exam in 2024. This training will prepare him to apply supervisory principles to
his routine duties and to step into a supervisory role immediately following the next vacancy.
Public Safety Initiatives and Operations
Ongoing or new efforts that directly affect service to the community:
• A public safety announcement was sent via Constant Contact, reminding residents to take
measures to safeguard packages being delivered to their homes.
• Integration of the new report management and report writing systems adopted by all
jurisdictions in the consolidated dispatch consortium is near completion.
Staffing, Equipment and Administration
Resource stewardship and organizational health:
• One sergeant announced his intent to resign from the KPD, creating a vacancy in the
supervisory ranks.
• The officer who had been in the field training stage progressed well with a trajectory leading
to him being released to solo patrol in January 2026.
• The new department-owned duty firearms have been assigned to personnel who wish to
carry them. Training on the new sighting system is scheduled for January 2026.
155
Village of
Department of Public Works
Activity Report
To: President Kaz, Village Trustees and Village Manager
From: Donald Leicht, Public Work Superintendent
Date: January 13, 2026
The following informat ion provides an overview of the activity in the department
since the December 9th Village Board meeting.
Sewers and Streets
- Performed 24 JULIE locate requests
- Performed porous street inspection
- Repaired two streetlights and pulled new wire
- Removed 1 dead tree
- Performed tree inspections and collected data
- Salted roads during two snow/ice events
- Performed pothole patching
- Trimmed trees/bushes along sidewalks and roads to prevent damage to plows
- Removed all holiday décor
- Removed leaves from catch basins after large rain event
- Repaired plow damaged parkways
- Picked up residential leaves at curb per requests
Water – Distribution
- PRV, Booster Station, Water Tower
- Monthly bacteria IEPA water sample
- Performed repairs to 14 MTU’s and meters
- Performed winter pump inspections and test at booster
- Collected 20 LEAD water samples
- Trouble shot DCU at Devonshire and found no power. Had to run new electric
to antenna
Buildings/Structures
- Cleaned/disinfected vehicles weekly
- Cleaned and sanitized Public Works building weekly
156
- Completed bathroom remodel at Village Hall
- Trouble shot pickup truck and replaced breather for fuel tank
- Performed oil change on utility body
- Replaced cutting edges on all plow trucks
- Replaced carburetor on 4” trash pump
- Sharpened chain saws and pm
Administration
- Input invoices and created purchase orders
- Attended weekly staff meeting
- Attended meetings pertaining to beach improvements
- Contacted multiple contractors to replace roof top unit heat exchangers and
oversaw the completion of work
- Ordered salt
- Completed 2024 LMO2 per IDNR requirement
- Completed 2025 green street inspection report for MWRD as per agreement
- Wrote RFBA for winter tree trimming
- Met with staff to discuss monthly safety training and sign staff up for required
class
- Prepped for IRMA walk through
- Met with Inliner regarding status of project
157