_06082026-713
Village of Howard · Brown County · meeting of Jun 8, 2026 · Minutes
Open the original document More from Village of Howard
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Minutes of the Plan Commission Meeting
June 8, 2026 at 5:00 p.m.
Village Hall Board Room
1. Call to order: J. Muraski called the meeting to order at 5:00 p.m.
2. Roll call
Present: Plan Commission members President John Muraski, Ellery Gulbrand, Mark Semrau,
Randy Smith, Dan Kussow, Natasha Gwidt, Mike Soletski
Staff: Dave Wiese, Geoff Farr, Ciara Hurrish
3. Pledge of Allegiance: J. Muraski led everyone in the Pledge of Allegiance.
4. Approval of the agenda
M. Soletski moved to approve the agenda. E. Gulbrand seconded. The motion carried
unanimously.
5. Approval of the Plan Commission meeting minutes from May 11, 2026
R. Smith moved to approve the Plan Commission meeting minutes May 11, 2026. M. Semrau
seconded. The motion carried unanimously.
6. PUBLIC HEARING AT 5:05 P.M. – CONDITIONAL USE REQUEST FOR VEHICLE SALES AND
REPAIR FOR SUN POWER TRAILERS LLC DBA GRID SOLUTIONS LLCS AT 1631
BROOKFIELD AVENUE, UNIT BB01, VH-123
D. Wiese explained that the applicant is requesting a Conditional Use Permit to allow vehicle
sales and repair activities associated with the conversion of utility trailers into off-grid solar-
powered energy units. He noted that the applicant requires zoning approval to obtain a state
dealership license for the sale of the trailers. Staff was supportive of the request. J. Muraski
opened the public hearing and invited members of the public to speak.
Steve Fischer, owner of Sun Power Trailers LLC dba Off Grid Solutions LLC, explained that the
business converts utility trailers into mobile off-grid power hubs equipped with solar panels
and battery systems. He stated that the trailers are built to order and sold primarily through
online sales. He indicated that typically no more than two trailers would be on site at any given
time and that most would be stored inside the building.
R. Smith asked whether the business would generate any waste streams requiring special
disposal. Mr. Fischer responded that the operation would not generate oils, fluids, or similar
waste, as the work primarily involves solar panels, batteries, and electrical components. J.
Muraski asked whether storing trailers on site would conflict with the property's lease
agreement. Mr. Fisher stated he had discussed the proposed use with the property owner and
was informed it would not violate the lease terms. No other members of the public came
forward to speak. J. Muraski closed the public hearing.
7. ACTION ON CONDITIONAL USE REQUEST FOR VEHICLE SALES AND REPAIR FOR SUN
POWER TRAILERS LLC DBA GRID SOLUTIONS LLC AT 1631 BROOKFIELD AVENUE, UNIT
BB01, VH-123
J. Muraski asked what enforcement options would be available if the number of trailers stored on
site exceeded the approved amount. D. Wiese explained that the conditions of approval could be
modified and that the Plan Commission could establish limits or review periods through the
Conditional Use Permit process.
M. Soletski questioned the proposed restriction limiting hours of operation to 8:00 a.m. to 5:00
p.m., noting that other businesses within the industrial complex operate beyond those hours. D.
Kussow asked how the trailers would be titled and licensed. Mr. Fis cher explained the trailers
would be licensed as cargo or utility trailers and that the company would only be installing the
electrical and solar systems. Commission members discussed battery storage and fire safety
considerations. Board members suggested that the applicant provide a building layout
identifying battery locations to assist the Fire Department in the event of an emergency. Mr.
Fischer indicated he had no objection to providing that information.
E. Gulbrand made a motion to approve the conditional use permit, subject to the following
conditions:
1. Outdoor parking or display shall be limited to no more than five trailers on the site.
2. The applicant shall comply with all applicable local ordinances and dealer licensing
requirements.
3. The applicant shall provide a building layout identifying the location of battery storage and
related equipment for Fire Department reference.
4. The property shall continue to be maintained in its current condition.
M. Soletski seconded. The motion carried unanimously.
8. REVIEW AND TAKE ACTION ON THE REVISED GLENDALE ACRES FINAL PLAT
D. Wiese explained that the Revised Glendale Acres Final Plat consists of 30 residential lots and
is the first phase of a larger development area recently annexed from the Town of Pittsfield. He
reviewed the overall layout of the development and noted that the Village has been working
with the developers to move the project forward so construction can begin. G. Farr noted that
the cluster mailbox locations and notes should be approved by the Village Engineering
Department and requested a condition requiring Lot 30 to be connected to sanitary sewer and
water services. Commission members discussed coordination of street names between the
Glendale Acres and Northern Reach plats, noting that roadway names must be consistent where
streets connect.
Commission members and staff discussed future trail connectivity within the development.
N. Gwidt made a motion to approve the Final Plat of Glendale Acres, contingent upon:
1. Condition on adding storm water drainage easements as requested by Village.
2. Dedication and construction of a regional stormwater pond from neighboring properties
3. Trail dedications and conservancy easements to protect the trees and wooded areas.
4. Sanitary and stormwater easements as required by Village of Howard Engineering
Department
5. All lots fronting Glendale Avenue are changed to outlots since utilities will not be available.
6. The CBU (cluster mailbox) locations (and notes) are approved by the Village of Howard
Engineering Department
7. Road names need to be coordinated for the area so names aren’t changing across
developments
8. Lot 30 shall be connected to sanitary sewer and water services
R. Smith seconded. The motion carried unanimously.
9. REVIEW AND TAKE ACTION ON THE FINAL PLAT OF NORTHERN REACH
D. Wiese explained that the Final Plat of Northern Reach is the next phase of development in the
area west of Glendale Acres. He reviewed the revised plat provided to the Plan Commission and
noted that lots fronting Glendale Avenue must remain as outlots until utilities become available.
G. Farr explained that designating the Glendale Avenue parcels as outlots prevents the creation
of buildable lots without utility service and helps avoid future special assessment issues. A
representative of Vierbicher stated that Phase 2 of the development is anticipated to begin in
the winter or spring. In response to questions from the Plan Commission, he stated that
information provided to future homeowners would include the overall development plan so
they are aware of future phases of development in the area. Commission members discussed
the importance of ensuring future property owners understand that additional development
may occur behind their properties. G. Farr requested that Condition No. 6 be revised to include
approval of the cluster mailbox locations and notes.
R. Smith made a motion to approve the Final Plat, contingent upon:
1. Dedication and construction of a regional stormwater pond from neighboring
properties
2. Trail dedications and conservancy easements to protect the trees and wooded areas.
3. Dedicate northwest corner of the plat for a future park and provide a 20-foot access.
4. Sanitary and stormwater easements as required by Village of Howard Engineering
Department
5. All lots fronting Glendale Avenue are changed to outlots since utilities will not be
available.
6. The CBU (cluster mailbox) locations (and notes) are approved by the Village of Howard
Engineering Department.
7. Road names need to be coordinated for the area so names aren’t changing across
developments.
E. Gulbrand seconded. The motion carried unanimously.
10. REVIEW AND TAKE ACTION ON VACATING A PORTION OF SECURITY BOULEVARD
D. Wiese explained that the request is part of the T-Wall Development and reviewed the
statutory process required to vacate public right-of-way. He stated that the proposed vacation
area consists of excess right-of-way and is necessary for the approved development to move
forward. Commission members asked questions regarding the impact of the vacation on
property access, roadway configuration, and utility easements. Staff explained that the roadway
would remain unchanged and that utility easements would be maintained as required.D.
Kussow made a motion to approve vacating a portion of Security Boulevard. M. Soletski
seconded. The motion carried unanimously.
11. FUTURE AGENDA ITEMS (NONE)
12. ADJOURN THE MEETING
N. Gwidt moved to adjourn. E. Gulbrand seconded. The motion carried unanimously, and the
meeting adjourned at 5:40 p.m.
Ciara Hurrish
Public Information Officer/Deputy Clerk
Source: Village of Howard website. First collected Oct 15, 2026.