Agenda Attachment
Village of Allouez · Brown County · meeting of Dec 8, 2025 · Agenda packets
Open the original document More from Village of Allouez
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
AGENDA
JOINT PUBLIC WORKS COMMITTEE/PARKS, RECREATION, & FORESTRY COMMITTEE MEETING
FOLLOWED BY PUBLIC WORKS COMMITTEE MEETING
Wednesday, December 10th, 2025 at 5:30 p.m.
Allouez Village Hall, 1900 Libal Street
1. CALL TO ORDER/ ROLL CALL
2. MODIFY/ADOPT AGENDA
OLD BUSINESS:
3. DISCUSSION/ACTION: RIVERVIEW PARK STORMWATER POND (DPW & Parks Dept.)
4. ADJOURNMENT
PUBLIC WORKS COMMITTEE MEETING
1. CALL TO ORDER/ ROLL CALL
2. MODIFY/ADOPT AGENDA
3. APPROVAL OF NOVEMBER 4, 2025 MINUTES
4. ANNOUNCEMENTS
5. PUBLIC APPEARANCES
NEW BUSINESS:
6. DISCUSSION/ACTION RE: LIBAL STREET RESURFACING PROJECT
a. ON-STREET PARKING ANALYSIS
b. PROPOSED TYPICAL SECTION
7. DISCUSSION/ACTION RE: RENEWAL OF HYDROCORP’S RESIDENTIAL CROSS CONNECTION CONTROL
INSPECTION SERVICES AGREEMENT
8. DISCUSSION/ACTION RE: AMENDMENT TO CHAPTER 432, WASTE MANAGEMENT, OF THE VILLAGE OF
ALLOUEZ MUNICIPAL CODE
REPORTS:
9. REPORT RE: WATER RATE STUDY
10. FUTURE AGENDA ITEMS
11. ADJOURNMENT
NOTE: It is possible that members of and a possible quorum of members of other governmental bodies of the municipality
may be in attendance at the above noticed meeting to gather information; no action will be taken by any governmental body at
the above noticed meeting other than the governmental body specifically referred to above in this notice.
The McMAHON Way…values. culture. Relationships, since 1909.
1445 McMAHON DRIVE NEENAH, WI 54956
920 751 4200 mcm@mcmgrp.com mcmgrp.com
w:\PROJECTS\A0012\92200112\Admin\Meeting\2025-12-101
Riverview Pond Project
NICK VANDE HEY, PE
1
2/10/2025
Municipal Stormwater Permit
Village received its initial Municipal Stormwater
Permit from Wisconsin DNR in 2006
Lower Fox River Basin TMDL for phosphorus and
sediment pollutants was approved by EPA in 2012
TMDL phosphorus and sediment allocations
implemented thru Municipal Stormwater Permit
2023 WDNR concurrence of Village submitted
Stormwater Plan of Action
1
2
The McMAHON Way…values. culture. Relationships, since 1909.
1445 McMAHON DRIVE NEENAH, WI 54956
920 751 4200 mcm@mcmgrp.com mcmgrp.com
w:\PROJECTS\A0012\92200112\Admin\Meeting\2025-12-102
Sediment
Phosphorus
TMDL Pollutants of Concern
3
4
The McMAHON Way…values. culture. Relationships, since 1909.
1445 McMAHON DRIVE NEENAH, WI 54956
920 751 4200 mcm@mcmgrp.com mcmgrp.com
w:\PROJECTS\A0012\92200112\Admin\Meeting\2025-12-103
Village Wide Summary
Provided
TSS
Required
TSS
Provided
TP
Required
TP Acres Watershed
48% 52% 33% 41% 1,929 East River
36% 72% 25% 41% 763 Fox River
Stormwater Quality
Management -
Plan of Action
5
6
The McMAHON Way…values. culture. Relationships, since 1909.
1445 McMAHON DRIVE NEENAH, WI 54956
920 751 4200 mcm@mcmgrp.com mcmgrp.com
w:\PROJECTS\A0012\92200112\Admin\Meeting\2025-12-104
Riverview Pond
Watershed
150 Acres
Typical Wet Pond Cross Section
+/-
5’ to 11’
6’ to 8’
Safety Shelf
7
8
The McMAHON Way…values. culture. Relationships, since 1909.
1445 McMAHON DRIVE NEENAH, WI 54956
920 751 4200 mcm@mcmgrp.com mcmgrp.com
w:\PROJECTS\A0012\92200112\Admin\Meeting\2025-12-105
Costs Included:
•Wet pond, storm sewer, pavement restoration, erosion controls, riprap,
and landscaping (e.g. prairie/wetlands in pond, lawn restoration).
•Baseball Diamond (only if shown to be relocated on the drawing).
•Construction, engineering, contingency fund, and regulatory fees.
•Wetland mitigation credits (if required).
Costs Excluded:
•Retaining walls, fences, aerators, parking expansion, gas relocation.
•Other park improvements
Opinions of Probable Cost
Riverview Pond
Option 1
DNR Grant $150,000 (18%)
Village $680,000 (82%) Total
Cost $830,000
9
10
The McMAHON Way…values. culture. Relationships, since 1909.
1445 McMAHON DRIVE NEENAH, WI 54956
920 751 4200 mcm@mcmgrp.com mcmgrp.com
w:\PROJECTS\A0012\92200112\Admin\Meeting\2025-12-106
Riverview Pond
Option 1
Pros
•Lowest cost option
•Adjacent to East River
•No wetland impact
•No softball field impact
•Uses existing 48” storm sewer (2005)
•Storm sewer does not cross gas main
Cons
•Neighborhood not in favor of pond
within backyard
Riverview Pond
Option 2
DNR Grant $150,000 (7%)
Village $2,000,000 (93%)
Total Cost $2,150,000
11
12
The McMAHON Way…values. culture. Relationships, since 1909.
1445 McMAHON DRIVE NEENAH, WI 54956
920 751 4200 mcm@mcmgrp.com mcmgrp.com
w:\PROJECTS\A0012\92200112\Admin\Meeting\2025-12-107
Riverview Pond
Option 2
Pros
•Located in NE corner of park
•Adjacent to East River
•No wetland impact for pond
Cons
•Relocation of two softball fields
•Wetland impact for two softball fields
•Storm sewer crosses gas main
•Highest cost option
Riverview Pond
Option 3
DNR Grant $0 (0%)
Village $1,070,000 (100%)
Total Cost $1,070,000
13
14
The McMAHON Way…values. culture. Relationships, since 1909.
1445 McMAHON DRIVE NEENAH, WI 54956
920 751 4200 mcm@mcmgrp.com mcmgrp.com
w:\PROJECTS\A0012\92200112\Admin\Meeting\2025-12-108
Riverview Pond
Option 3
Pros
•Low cost option, but not lowest
•No impact to softball fields
Cons
•Wetland impact for pond
•Limited ability to serve Park’s future
stormwater needs
•Storm sewer crosses gas main
•Neighborhood not in favor of pond
across the street
Riverview Pond
Option 4A
DNR Grant $0 (0%)
Village $1,410,000 (100%)
Total Cost $1,410,000
15
16
The McMAHON Way…values. culture. Relationships, since 1909.
1445 McMAHON DRIVE NEENAH, WI 54956
920 751 4200 mcm@mcmgrp.com mcmgrp.com
w:\PROJECTS\A0012\92200112\Admin\Meeting\2025-12-109
Riverview Pond
Option 4A
Pros
•Located in NE corner of park
•Adjacent to East River
•Reduces impact to one softball field
Cons
•Loss of one softball field
•Wetland impact for pond
•Storm sewer crosses gas main
•Middle cost option
Summary:
April 2023 – Joint PW and Parks Committee Meeting
September 2023 – Public Informational Meeting
December 2023 – Joint PW and Parks Committee Meeting
February 2024 – Village Board Meeting
WDNR feedback on options
Recent Public Meetings
17
18
The McMAHON Way…values. culture. Relationships, since 1909.
1445 McMAHON DRIVE NEENAH, WI 54956
920 751 4200 mcm@mcmgrp.com mcmgrp.com
w:\PROJECTS\A0012\92200112\Admin\Meeting\2025-12-1010
Public comment summary for Options 1, 2, 3 and 4A:
1. Neighborhood desires larger distance between homes and
proposed pond.
2. Softball club desires minimal to no softball field loss (many families
without a home near the park use the softball fields for recreation).
3. Minimize wetland disturbance (this comment seems to carry less
weight with the public compared to the first two priorities).
4. Minimize costs (this comment seems to carry less weight with the
neighborhood compared to the first priority).
Public Comments
Pond Options:
•Option 1 – Staff recommends adding fencing and aeration device at an
approximate additional cost of $100,000
•Option 4A – Staff recommends adding relocation of the impacted
softball field at an approximate additional cost of $300,000
Recommendation
19
20
The McMAHON Way…values. culture. Relationships, since 1909.
1445 McMAHON DRIVE NEENAH, WI 54956
920 751 4200 mcm@mcmgrp.com mcmgrp.com
w:\PROJECTS\A0012\92200112\Admin\Meeting\2025-12-1011
Tentative Pond Schedule
WDNR Grant Application Due:
April 15, 2026
Finalize Plans, Specifications,
and Cost Estimate: Fall 2026
Obtain WDNR Permits: Fall 2026
Construction Begins:
May 2027
Questions?
21
22
PUBLIC WORKS COMMITTEE MEETING
Tuesday, November 4th, 2025 at 5:30 p.m.
Allouez Village Hall, 1900 Libal Street
CALL TO ORDER/ ROLL CALL
Chairperson Leiterman called the meeting to order at 5:36 p.m.
Present: Beyler, Collison, Genrich, Lefebvre, Leiterman
Also present: Sean Gehin, Jim March
MODIFY/ADOPT AGENDA
Genrich/Lefebvre moved to adopt the agenda as presented. Motion carried.
APPROVAL OF OCTOBER 7TH, 2025 MINUTES
Leiterman/Collison moved to approve the October 7, 2025 minutes. Motion carried.
ANNOUNCEMENTS
a. Joint Public Works Committee / Parks, Recreation, & Forestry Committee Meeting will be held on
Wednesday, December 10th, 2025 at 5:30pm
PUBLIC APPEARANCES
- None
2026 PUBLIC WORKS DEPARTMENT BUDGET
S. Gehin:
- Gave an overview of the 2026 Public Works Department Budget
Engineering Budget:
- Budget is estimated at $158,000, an increase of approximately $30,000 compared to this
year’s budget amount.
- TDS project will resume this fall and completed in 2026. Budget includes TDS Permitting
and Inspection Costs. Any expenses ($60,000) incurred next year to be offset by the permit
fees.
- Partial funding of a Staff Engineer. Expenses to be equally allocated to the engineering,
sanitary, water and storm water utility accounts.
- $10,000 for shared portion of GIS (Ruekert Meilke and ESRI), Autodesk Civil 3D and Adobe
Acrobat Pro subscription cost of $40,000.
Public Works Budget:
- Next year’s estimated State General Transportation Aid funding is $476,000. An increase of
approximately $36,000 compared to this year’s funding levels.
- Recycling Grant funding is anticipated to match this year’s funding level - $98,500
- ROW Permit Fees. TDS Permit Fees to Generate Revenue Offsetting Village Incurred
Expenses (review, permitting and inspection).
- Do not anticipate generating any revenue from the sale of recyclables in 2026.
- Sale of garbage and recycling carts to residents is anticipated to generate $40,000 to offset
the purchase of new carts.
- Mild winters have reduced amount of salt placed on village streets. Budget includes
purchase of salt in the amount of $30,000 for the 2026/2027 winter season.
- Street maintenance, repair and paving budgeted amounts are as follows:
▪ $500,000 Street Paving
▪ $50,000 Street Patching
▪ $25,000 Crack filling
▪ $10,000 for the Spot Repair of Defective Curb and Gutter
▪ $20,000 for the Spot Repair of Defective Sidewalk
- Cost to clear and repair sidewalk will continue to increase with the construction of new
sidewalk. (Libal Street (2024) and Greene Ave. (2025)).
- Garbage and Recycling cart expense to be offset by revenue generated by sale of carts ($70
Each).
- Landfill/MRF disposal cost overall to increase by $15,000 compared to this year’s budget.
Garbage - The Brown County landfill tipping fee will increase from $55.75 to $57, a CPI
increase of approximately 2%. Overall resulting in an annual increase from $5,000 to
dispose of garbage. Recycling - It is anticipated that the Village will pay approximately
$20/ton to dispose of recyclables in 2026 at an estimated cost of $20,000. A payment of
$10/ton was anticipated this year.
Sewage Treatment:
- A rate case completed in June has led to an increase in annual operating revenues (roughly
speaking $250,000). The 2026 forecasted revenue is $3.5 million. The forecasted operating
expenses are $3.3 million; a $150,000 increase compared to this year’s budget of $3.15
million.
- Sanitary Sewer Utility Budget items include-NEW Water is proposing a 7% cost increase for
the treatment of wastewater (Municipal Users). Weather dependent the Village is estimating
to pay approximately $2.5 million in 2026. An increase of $150,000 compared to this year’s
budgeted treatment cost ($2.35 million).
- Sanitary Sewer Repair budget of $60,000. An increase of $10,000 compared to this year’s
budget. This is to account for rising material and installation costs.
Water Department:
- Leaks contributing to above average water purchase and water loss have been detected and
repaired. And as such the estimated year end water purchase cost is above this year’s
budgeted amount by $135,000.
- CBCWA wholesale cost to purchase water will decrease from $4.42 to $4.28 per 1,000 gals.
Next year’s projected wholesale water cost is estimated at $1,603,500. A decrease of
$54,000 from this year’s budgeted expense of $1,657,500.
- Continue with HydroCorp contract services for residential and commercial cross connection
inspection. The 2026 budgeted Cross-Connection Inspection cost for residential and
commercial inspections is approximately $21,000 and $8,000 respectively.
- Verizon is proposing to install additional antenna to Standpipe. Added equipment will
require structural improvements to tank. Cost to review, permit, construct and inspect
improvements to be paid by Verizon.
- Roof and overflow repairs to be completed at the Vande Hei and Dauphin reservoirs in 2026.
Bond funding was secured this year to pay for project.
- Increase contracted service budgets for the repair of watermain and water services to
$70,000. Funds will be used to repair breaks, leaks and remove lead services.
Storm Water Utility:
- The storm sewer repair budget was increased to $70,000 to keep pace with rising
construction costs. An increase of $10,000 compared to past budgeting efforts.
- Pond maintenance expenses will decrease by $5,000 to $15,000. Includes maintenance of
adjacent prairies and removal of rodents
Equipment Replacement:
- Forecasted revenue of $680,000 is greater than the estimated operation and maintenance
cost is $580,000. Operation and maintenance cost does not include the cost to replace aged
equipment. Continue to borrow for larger equipment purchases > $100,000
DRIVEWAY CONSTRUCTION STANDARD OPERATING PROCEDURES
S. Gehin:
- The scope of a reconstruction project includes the construction of new concrete driveway
apron at no expense to the homeowner.
- Behind the new apron the Village transitions to the existing driveway matching the existing
pavement in-kind.
- The length of the transition varies from 2-10 feet.
- Driveway slope, layout of existing joints and condition of driveway all play a role in
determining transition length.
- On most reconstruction projects, there are a handful of homeowners wanting to replace the
remainder of their driveway (project limits to the garage).
- Consistent with past practices, homeowners are pointed to the concrete subcontractor.
Additional driveway work is contingent upon contractor availability and is at the expense of
the homeowner.
- The subcontractor separately invoices the homeowner for the additional driveway work
(i.e. from project limits to the garage).
- Under this year’s reconstruction project, the concrete subcontractor did not have
availability to take on additional driveway work (beyond that provided for in the contract).
- Around 6 homeowners took it upon themselves to hire a contractor to replace the
remainder of their driveway. And in some cases, the work was done before the pouring of
the concrete driveway apron. Furthermore, limits of work extended from garage door to
the proposed concrete apron eliminating need for the Village to transition behind the apron.
- Homeowner replacement resulted in a uniform driveway slope, joint spacing and a
reduction in project cost. The driveway transition as shown on the plan was no longer
necessary.
- Homeowners are requesting compensation for the driveway replacement completed within
the transition area as shown on the plans and provided for in the contract.
- Driveway reimbursement would be limited to the bid unit price and transition area as
shown on the plans. Average reimbursement is estimated at $500 to $1000 per driveway.
- To recognize homeowner cooperation and to treat property owners fairly, Gehin
recommends reimbursement to the property owner.
- To ensure matter is being handled on a consistent and fair basis, the Public Works
Department will be putting together a standard operating procedure for future Street
Improvement projects.
WATER DISTRIBUTION SYSTEM – WATER USAGE
S. Gehin:
- From the beginning of this year through August undetected leaks within the Village water
distribution system have resulted in an above average water purchase from the Central
Brown County Water Authority.
- During that timeframe the average daily water purchase was over 1.15 million gallons a day.
A typical daily water purchase is roughly 1 million gallons.
- A leak detection survey completed early in August discovered 11 leaks. The subsequent
repair of those leaks has returned the Village’s water daily purchase to normal levels early
in September.
- This year’s budgeted annual and monthly bulk water purchase from CBCWA is 375,000,000
and 31,250,000 million gallons respectively.
- As a result of the leaks, the yearend water purchase is estimated to be 405,000,000 gallons.
At a billed CBCWA bulk water rate of $4.42 (1,000 gal) the additional expense to the Utility
is estimated at $135,000.
2025 CONSTRUCTION PROJECT UPDATE
S. Gehin:
- Gave an update on the 2025 Construction projects.
FUTURE AGENDA ITEMS
- None
ADJOURNMENT
Genrich/Leiterman moved to adjourn at 6:17 p.m. Motion carried.
MEMORANDUM
DATE: November 26, 2025
TO: Sean Gehin / Village of Allouez
FR: Doug Senso / raSmith
RE: Libal Street Parking Analysis
Introduction
The Libal Street project in the Village of Allouez begins at the intersection of Lebrun Street and end s approximately 300’
southwest of the Hoffman Road intersection. This pr oject is proposed to include sidewalk extension on the east side of the
street, curb ramp improvements, curb & gutter and s idewalk replacement as needed, spot storm sewer repair, and
roadway resurfacing.
The Village of Allouez desires to allow parking on one side of Libal Street to accommodate five-foot wide marked bicycle
lanes on both sides of the roadway. To determine th e appropriate side of the street for parking, raSmith evaluated the
number of parking spots available on each side and their proximity to land uses that benefit from adjacent parking.
Methodology
Both sides of Libal Street, from Lebrun Street to Hoffman Road, were evaluated to determine which side offers greater
parking capacity. The assessment began with a revie w of existing parking signage. Currently, Libal Str eet has no posted
parking restrictions, except for temporary limitations during garbage collection. Other WisDOT parking criteria found in
Attachment 1 were used to determine the number of av ailable parking spaces on each side of the road. Ad ditional criteria
outlined in Attachment 1 were applied to calculate t he number of available parking spaces on each side.
These criteria include:
• A minimum 15-foot gap between parking stalls and cro sswalks
• A minimum 10-foot clearance from fire hydrants
• A minimum 4-foot clearance from driveways
• A standard parking stall length of 25 feet as agreed to with the village
• A 20-foot no-parking zone near intersection curb rad ii
Finally, locations of schools, churches, and busine sses were considered in addition to future developm ent plans. This
segment of Libal Street is predominantly residentia l, except for two schools and two churches.
Findings and Recommendation
Using the methodology noted above, there are 65 avail able parking spaces on the west side of Libal Street and 62 on the
east side. This very small difference was not consi dered a determining factor when evaluating which si de of the street to
allow parking in the proposed condition. There are no major businesses or community destinations on ei ther side that
factor into the parking recommendation. The west si de offers longer areas for continuous parking. Futu re plans north of
Hoffman Road include redevelopment near Langlade El ementary School. The large Catholic school is locat ed on the west
side of Libal Street, although the main student dro p-off area is along Delahaut Street which is 1 block west of Libal Street.
For these reasons, it is recommended to locate the parking lane on the west side of Libal Street. In a ddition to the west side
Page 2 / November 5, 2025
parking lane, curb extensions are recommended in th e northwest quadrants of the Longview Avenue and Hi lltop Drive
intersections to shorten pedestrian crossings at th ese school zone locations.
List of Attachments
Attachment 1: WisDOT Typical Urban Parking Layout f or 2-Lane Highway
Attachment 2: Libal Street Parking Analysis Exhibit
Approval:
______________________________________ ___________ ______
Village of Allouez, Director of Public Works Date
0
5
HYDRANT
LEBRUN ST
KENNEY STGWYNN STLIBAL ST193' (7 SPACES)39' (1 SPACE)90' (3 SPACES)211' (8 SPACES)39' (1 SPACE)119' (4 SPACES)210' (8 SPACES)224' (8 SPACES)
BEGIN PROJECT4517-07-00
10 15LONGVIEW AVE
SUNRISE LN
LIBAL ST
HYDRANT
170' (6 SPACES)77' (3 SPACES)58' (2 SPACES)65' (2 SPACES)88' (3 SPACES)82' (3 SPACES)43' (1 SPACE)33' (1 SPACE)38' (1 SPACE)26' (1 SPACE)38' (1 SPACE)119' (4 SPACES)46' (1 SPACE)
PARKING AVAILABILITY SHEET 1 SUBTOTALWEST SIDE: 33 PARKING SPACES (988 FEET)EAST SIDE: 36 PARKING SPACES (1,020 FEET)
PROPOSED CROSSWALK LOCATED HERE
DOTY ELEMENTARY SCHOOL430' EAST OF LIBAL STREET
PLOT SCALE :1IN:60FT4517-07-70LIBAL STREETBROWNPARKING ANALYSIS EXHIBITWISDOT/CADDS SHEET 44EHWY:COUNTY:K:\1252711\CIVIL3D\45170700\DSGN\CHECK\LIBAL ST PARKING EXHIBIT.DWGFILE NAME : 11/4/2025 3:58 PMPLOT DATE :PLOT BY :BOUC, BRETT
2
PROJECT NO: PLOT NAME :
2
SHEET LAYOUT NAME - 60 Scale-1 1
20 25
VANDE HEI RDCUSTER CTE BRIAR LNLIBAL ST
HYDRANTHYDRANTHYDRANT
CHABAD OFTHE BAY AREA32' (1 SPACE)115' (4 SPACES)50' (2 SPACES)63' (2 SPACES)48' (1 SPACE)46' (1 SPACE)68' (2 SPACES)34' (1 SPACE)163' (6 SPACES)38' (1 SPACE)78' (3 SPACES)216' (8 SPACES)
30 35LIBAL STHILLTOP DR
SOMERSET DR
HYDRANTFATHER ALLOUEZ CATHOLIC SCHOOL /RESURRECTION CATHOLIC CHURCH
43' (1 SPACE)135' (5 SPACES)172' (6 SPACES)215' (8 SPACES)173' (6 SPACES)
PARKING AVAILABILITY SHEET 2 SUBTOTALWEST SIDE: 32 PARKING SPACES (883 FEET)EAST SIDE: 26 PARKING SPACES (806 FEET)PARKING AVAILABILITY TOTALSWEST SIDE: 65 PARKING SPACES (1,871 FEET)EAST SIDE:62 PARKING SPACES (1,826 FEET)
END PROJECT4517-07-00
PLOT SCALE :1IN:60FT4517-07-70LIBAL STREETBROWNPARKING ANALYSIS EXHIBITWISDOT/CADDS SHEET 44EHWY:COUNTY:K:\1252711\CIVIL3D\45170700\DSGN\CHECK\LIBAL ST PARKING EXHIBIT.DWGFILE NAME : 11/4/2025 3:58 PMPLOT DATE :PLOT BY :BOUC, BRETT
2
PROJECT NO: PLOT NAME :
2
SHEET LAYOUT NAME - 60 Scale-2
EXISTING TYPICAL SECTION - LIBAL STSTA XX TO STA XX
Ϯ йϭϮΖϭϮΖϮ йTZAsEL LANETZAsEL LANEZͬLZͬt
ϮϰΗ ChZB Θ GhTTEZ͕ TYP
ϴ͘ϱΖϴ͘ϱΖϱΖ ϱΖϭϭ͘ϱΖ ϭϭ͘ϱΖΎϰϬΖ ZͬtϰϬΖ
ϰΗ CONCZETE SIDEtAL<͕ TYPϰΗ ASPHALTIC PAsEDENT͕ TYPϭϯΗ CZhSHED AGGZEGATE BASECOhZSE͕ TYPCONCZETE SIDEtAL< STA XX TO STA XX
NOTESΎZEDhCED TEZZACE tIDTH BETtEEN STA XнXX - STA XнXX
ϮΖ;TYPͿ
tISDOTͬCADDS SHEET ϰϮEHtY͗COhNTY͗<͗ͰϭϮϱϮϳϭϭͰCIsILϯDͰϰϱϭϳϬϳϬϬͰSHEETSͰϬϮϬϯϬϭ-TS͘DtGFILE NADE ͗ ϭϮͬϯͬϮϬϮϱ ϯ͗ϰϭ PDPLOT DATE ͗PLOT BY ͗BOhC͕ BZETT
2
PZO:ECT NO͗PLOT NADE ͗
2
SHEET PLOT SCALE ͗ϭ IN͗ϭϬ FTBZOtNTYPICAL SECTIONSLAYOhT NADE - ϬϮϬϯϬϭ-ƚƐLIBAL STZEETϰϱϭϳ-Ϭϳ-ϳϬ
Ϯ йϭϮΖϭϮΖϮ͘ϴ йTZAsEL LANETZAsEL LANEZͬL Zͬt
ϮϰΗ ChZB Θ GhTTEZTO ZEDAIN ;TYPͿΎ
ϱΖ ϱΖ ϱΖϱΖ ϭϭ͘ϱΖϭϭ͘ϱΖ ϯϲ͘ϱΖZͬtϰϯ͘ϱΖϳΖ BI<E LANEBI<E LANEPAZ<INGLANEEXIST CͬLϯ͘ϱΖ
FINISHED TYPICAL SECTION - LIBAL STϰΗ CONCZETE SIDEtAL<TO ZEDAINΎΎϮΗ ZEDOsING ASPHALTICShZFACE DILLINGϮΗ HDA PAsEDENTϰΗ CONCZETE SIDEtAL< TO ZEDAINΎΎCONSTZhCT NEt SIDEtAL<STA XнXX - STA XнXX ZT ANDSTA XнXX - STA XнXX ZTSTA XX TO STA XXNOTESΎSEE PLAN FOZ LOCATION OF ChZB Θ GhTTEZ ZEPLACEDENT AZEASΎΎSEE PLAN FOZ LOCATION OF SIDEtAL< ZEPLACEDENT AZEAS
ϮйϮйEXISTING ϭϯΗ CZhSHED AGGZEGATEBASE COhZSE TO ZEDAINϮΖ;TYPͿ
tISDOTͬCADDS SHEET ϰϮEHtY͗COhNTY͗<͗ͰϭϮϱϮϳϭϭͰCIsILϯDͰϰϱϭϳϬϳϬϬͰSHEETSͰϬϮϬϯϬϭ-TS͘DtGFILE NADE ͗ ϭϮͬϯͬϮϬϮϱ ϯ͗ϰϭ PDPLOT DATE ͗PLOT BY ͗BOhC͕ BZETT
2
PZO:ECT NO͗PLOT NADE ͗
2
SHEET PLOT SCALE ͗ϭ IN͗ϭϬ FTϰϱϭϳ-Ϭϳ-ϳϬLIBAL STZEETBZOtNLAYOhT NADE - ϬϮϬϯϬϮ-ƚƐ TYPICAL SECTIONS
VILLAGE OF ALLOUEZ
Allouez Village Hall ◦ 1900 Libal Street ◦ Green Bay, Wisconsin 54301-2453
Phone No.: (920) 448-2800 ◦ Fax No.: (920) 448-2850
Department of Public Works
12/02/2025
2025 Water Utility Rate Case - Update
With assistance from the Village, Onward Accounting and Consulting has completed and submitted a
conventional rate case to the Public Service Commission (PSC). As reported at the August 5, 2025,
committee meeting, the Village undertook the water rate study to determine the adequacy of the
rates to meet utility operational and maintenance costs including debt service requirements. The rate
case submitted to the PSC in November proposes a 10% rate increase. In general, the proposed
increase results in a $4.00 increase to an average monthly water bill.
The PSC will review and ultimately determine the rate increase necessary to adequately fund the
water utility. Review of the rate case is anticipated to take four to six months and includes a public
hearing prior to the final decision by the PSC. The implementation of new rates by the Village is
expected mid-2026.
The last water rate case was implemented in January of 2022. Water rates billed by our neighboring
water utilities are attached. While many of the communities’ bill on a quarterly basis, the attached is
presented on a monthly basis for comparison purposes.
During the preparation of the rate case, staff questioned a possible change from monthly to quarterly
billing. Such a move would require PSC approval. Village staff are compiling information on cost
savings and the impact on our customers. Those savings and impacts include:
• Cost savings due to fewer mailings
• Staff availability
• Customer Affordability
• Customer Undetected Water Loss
• Additional Services – Customer portal for monitoring of water usage
The sanitary sewer and stormwater utility rates were last raised in June of this year and May of 2024,
respectively.
Sean J. Gehin, P.E.
Director of Public Works
Utility ID Utility Name County Utility
Class
Billing
Frequency
Monthly /
Quarterly
Current Rates 3,166.67
gallons with PFP Direct
charge
With Estimated
Increase at 3,166.67
gallons
Latest Rate Case
Effective Date
Known Pending Rate
Case and estimated
Increase
1610 De Pere Water Department Brown AB Q $ 45.72 $ 54.41 6/1/2024 2026 CRC pending
2800 Kaukauna Utilities Outagamie AB M $ 54.26 $ 54.26 8/1/2025
1600 Denmark Municipal Water Utility Brown C Q $ 49.94 $ 49.94 3/15/2024
5296 Town of Scott Water Utility Brown D Q $ 49.52 $ 49.52 12/30/2024
4890 Pulaski Water Department Brown C Q $ 49.37 $ 49.37 9/18/2025 2026 CRC pending
430 Bellevue Water Utility Brown AB M $ 37.17 $ 47.94 7/20/2015
October 2025 28.97%
increase
70 Village of Allouez Water Department Brown AB M $ 41.58 $ 45.73 1/1/2022 2026 CRC pending
2620
Village of Howard Water and Sewer
Department Brown AB M $ 44.22 $ 44.22 1/20/2021
3095 Town of Lawrence Water Utility Brown C Q $ 44.08 $ 44.08 8/1/2024
2135 Freedom Sanitary District No 1 Outagamie C Q $ 27.65 $ 43.35 6/1/2021
2026 Step I /2027 Step II
increases at 20% for Step
I and 40% for Step II
(Estimated Increase is full
60%)
5990 Two Rivers Water and Light Utility Manitowoc AB M $ 42.27 $ 42.27 9/1/2023
6800 Village of Wrightstown Water Utility Brown C Q $ 41.75 $ 41.75 6/1/2022
1615 Ledgeview Sanitary District No 2 Brown C Q $ 37.78 $ 37.78 3/21/2025
5780 Sturgeon Bay Utilities Door AB M $ 34.07 $ 34.07 8/1/2025
2310 Town of Grand Chute Sanitary District 1 Outagamie AB Q $ 32.78 $ 32.78 7/1/2024
3550 Fox Crossing Utilities Outagamie AB Q $ 31.59 $ 31.59 11/15/2024
190 Appleton Water Department Outagamie AB Q $ 31.41 $ 31.41 1/1/2018
6810 GREENLEAF WATER UTILITY Brown D Q $ 29.76 $ 29.76 12/18/2024
255 Ashwaubenon Water And Sewer Utility Brown AB Q $ 27.75 $ 27.75 3/18/2025
2573 Village of Hobart Water Utility Brown C Q $ 25.68 $ 25.68 1/1/2024
2350 Green Bay Water Utility Brown AB Q $ 24.42 $ 24.42 8/1/2024
5795 Suamico Water Utility Brown C Q $ 23.24 $ 23.24 6/14/2023 2026 CRC pending
3140 Little Chute Municipal Water Department Outagamie AB M $ 21.08 $ 21.08 9/29/2015
1545 Darboy Joint Sanitary District No 1 Outagamie AB Q $ 19.81 $ 19.81 9/24/2021
3320 Manitowoc Public Utilities Manitowoc AB M $ 17.86 $ 17.86 12/1/2023
AVERAGE MONTHLY BILLS
Source: Village of Allouez website. First collected Oct 15, 2026.